Page 1

PERTH AND KINROSS COUNCIL 
Climate Change & Sustainability Committee 
27 November 2023 
CRAIGIE BURN FLOOD STUDY 
Report by Head of Environmental and Consumer Service
(Report No. 23/331) 
1. PURPOSE 
1.1 This report sets out the outcome of the Council’s flood study on the Craigie
Burn, Perth. The report recommends that a small flood protection scheme is
taken forward as it has been found to be economically viable. As such, the
proposed scheme will be submitted to SEPA for national prioritisation and
inclusion in the next Tay Flood Risk Management Plan and Local Flood Risk
Management Plan, to be published in 2028. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
(i) notes the completion of the Craigie Burn Flood Study, as required by the
Tay Flood Risk Management Plan and Local Flood Risk Management
Plan.
(ii) notes that public engagement events have been held to disseminate the
findings of the flood study.
(iii) approves the recommendations of the study, including the proposals for a
small flood protection scheme on the Craigie Burn.
(iv) notes that details of the recommended flood protection scheme will be
submitted to SEPA for national prioritisation and inclusion in the Cycle 3
(2027-2033) Tay Flood Risk Management Plan, to be published in
December 2027, and Tay Local Flood Risk Management Plan, due for
publication in 2028.   
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues
• Section 5: Proposals
• Section 6: Conclusion
• Appendices

Page 2

4. BACKGROUND / MAIN ISSUES 
4.1 Under the Flood Risk Management (Scotland) Act 2009, SEPA and lead local
authorities published their Cycle 1 Flood Risk Management (FRM) Plans
(referred to as ‘Strategies’ at the time) and Local FRM Plans in December
2015 and June 2016 respectively.  These documents set out a range of
actions that SEPA and responsible authorities took to manage and, where
possible, reduce the risk of flooding over a six-year period. 
4.2 The (then) Environment Committee approved the content and publication of
the Cycle 1 Tay Local FRM Plan on 1 June 2016 (Report 16/241 refers). The
(then) Environment and Infrastructure Committee subsequently approved the
content of an Interim Report on the progress made in implementing the Cycle
1 Local FRM Plans on 23 January 2019 (Report 19/16 refers). 
4.3 SEPA and lead local authorities published updated Cycle 2 FRM Plans and
Local FRM Plans in December 2021 and December 2022 respectively for the
six-year period from 2022 to 2028. The Climate Change & Sustainability
Committee approved the content and publication of the Cycle 1 Final Report
and Cycle 2 Tay Local FRM Plan on 19 December 2022 (Report 22/307
refers). The published documents can be viewed at the following link:
http://www.pkc.gov.uk/frmplans. 
4.4 The published FRM plans and Local FRM plans identify various flood studies
as a means of further improving the understanding of flood risk in certain
locations. A flood protection study was identified for the Craigie Burn in Perth. 
4.5 The purpose of the flood study was to investigate what further action would be
required to manage flood risk at this location. Such action can be
implemented through flood protection schemes, where these are found to be
technically feasible and economically viable. 
4.6 The 2009 Act provides local authorities with discretionary powers to promote
flood protection schemes. Only those flood schemes which have been
included in the published FRM Plans, the Local FRM Plans and the national
priority list are taken forward in the subsequent 6-year period. 
4.7 Although public authorities are expected to take a proactive role in managing
and, where achievable, lowering flood risk, the primary responsibility for
avoiding or managing flood risk still remains with land and property owners. 
The 2009 Act does not alter this.  Individuals, businesses and communities
must, therefore, play a critical role in making themselves more resilient and
helping to reduce the impact of flooding. 
4.8 The Craigie Burn is situated within the south and western areas of Perth
within the River Tay catchment and Potentially Vulnerable Area (PVA)
02/08/12.

Page 3

4.9 The main potential source of flooding in this area of Perth is from the Craigie
Burn and its tributaries, the Scouring and Buckie Burns. This river (or fluvial)
flood risk was the main focus of this flood study. There are already existing
flood defences in the catchment, which form part of the Perth Flood Scheme,
and these already serve to reduce flood risk in the area.   
4.10 It is also acknowledged that there is also a significant risk of surface water (or
pluvial) and sewer flooding within the Craigie Burn catchment.  However, as
set out by the Tay Local FRM Plan, this form of flooding is being investigated
as part of the on-going Perth Surface Water Management Plan. The Council’s
flooding team is coordinating the work of this project with the Craigie Burn
flood study. 
4.11 Much of the existing hydraulic model for the Craigie Burn was developed as
part of earlier work on the Perth Integrated Catchment Study, which was
undertaken jointly with Scottish Water. In December 2021, consulting
engineers, Amey Consulting Ltd, were engaged to develop this model further
and to complete a flood study for the Craigie Burn. 
4.12 Amey’s investigations involved extensive data gathering and analysis,
consultations, topographic surveys, a hydrological assessment, hydraulic
modelling, an environmental desk study, an options study, an economic
appraisal and the production of final reports. 
4.13 The flood study analysed the flooding mechanisms affecting the Craigie Burn
catchment and a series of flood maps were produced. The study confirmed
properties are at risk of flooding in the following areas: 
• Cherrybank area – Glasgow Rd, Necessity Brae and Low Road
• Orchard Place and Murray Crescent
• Balmoral Place, Queen’s Avenue, Queen Street and Windsor Terrace 
• Croft Park and the South Inch 
4.14 The study also highlighted the complex interaction between different sources
of flooding within the catchment, namely river, surface water and sewer
flooding. 
4.15 The study estimates that up to 57 properties are potentially at risk during a 1
in 200-year flood event (the flood event with a 0.5% chance of occurring in
any one year). In future, this is estimated to increase to 114 properties due to
the effects of climate change. These numbers relate to those properties at risk
of internal flooding, i.e., where flooding occurs above the property threshold
level. The large increase in the number of properties potentially at risk of
flooding in the future (due to climate change) is mainly due to a predicted
increase in risk from surface water and sewer flooding. 
4.16 In managing flood risk, the Council is required to have regard to the
economic, social and environmental impact of its actions. The Scottish
Government’s guidance recommends that decision making in flood risk
management should be supported by an options appraisal.

Page 4

4.17 An options appraisal includes a cost-benefit analysis and other techniques to
determine whether a flood protection scheme meets its objectives, is
sustainable and represents best value for money. In general, the cost of flood
damage avoided over time must be greater than the cost of building the flood
defences, i.e., they must achieve a benefit/cost ratio of greater than 1.0. 
4.18 Amey initially considered a long list of potential actions to manage the risk of
flooding. This long list was screened to remove actions that were clearly not
feasible, leaving an initial short list of 14 potential actions. These actions were
assessed in detail within the hydraulic model to arrive at the final short list of 8
actions listed below: 
1. Upstream flood storage and natural flood management in the rural
catchment south of the M90. (Option 1 in the flood study report).
2. Increase storage capacity at the existing flood storage ponds adjacent to
the Glasgow Road (these form part of the Perth Flood Scheme).   
(Option 3 in the flood study report).
3. Improve river channel conveyance by dredging the Craigie Burn from
Buckie Braes to the South Inch. (Option 7 in the flood study report).
4. Create a flood storage area on the Craige Burn in the land between Low
Road and Orchard Place. (Option 8 in the flood study report).
5.  Improve capacity of existing culvert at Queens Avenue (beneath the
access to Queen’s Court). (Option 10 in the flood study report).
6. Improve capacity of existing culvert at Queens Avenue (beneath the
access to Queens Court) and modify adjacent river channel. (Option 11 in
the flood study report).
7. Improve the Craigie Burn to South Inch reservoir spill mechanism (to 
the east of Croft Park). (Option 13 in the flood study report).
8. Combination of options 6 and 7 (Options 11 and 13 in the flood study
report). 
4.19 These 8 options were subject to a technical, environmental and economic
appraisal. Details of the initial and final short-list of actions are shown in
Appendix 1, together with the estimated costs and benefit cost ratios.   
4.20 The flood study concluded that most of the identified options are not
economically viable as they have benefit/cost ratios of 1.0 or less. The study
has confirmed that the benefit/cost ratios for the short-listed options are
generally low, and this is due to the presence of the existing flood defences
within the catchment (which form part of the Perth Flood Scheme), and the
on-going maintenance that the Council currently undertakes. 
4.21 However, the short-listed options for upgrading the culvert at Queen’s Avenue
(options 5 & 6) did achieve a benefit/cost ratio of greater than 1.0 and Option
6 has been identified as the most cost-effective.

Page 5

4.22 The flood study therefore recommends Option 6 which consists of the
following two actions: 
a) upgrade and increase the capacity of the existing culvert on the Craigie
Burn at Queen’s Avenue (at the access to Queen’s Court).
b) localised channel modifications on the Craigie Burn (adjacent to Balmoral
Place and Queen’s Avenue) upstream and downstream of the upgraded
culvert. 
4.23 The recommended option is estimated to have a capital cost of £0.314M and
an overall benefit/cost ratio of 1.42. The flood study has, therefore, concluded
that this flood protection option is economically viable and should be
implemented. 
4.24 If these actions were to be implemented, then the estimated flow capacity of
the channel of the Craigie Burn at Queens Avenue would increase from its
current 1 in 5-year flood to the predicted 1 in 100-year flood.  A total of 22
properties would be protected up to the 1 in 100-year flood (and up to 18
properties would benefit in the 1 in 200-year flood), as described in Appendix
2. 
4.25 It is recognised that the recommended actions noted above have a limited
benefit and that properties in other areas of the catchment will remain at risk
of flooding from the Craigie Burn. The existing Perth Flood Scheme does offer
a limited degree of protection but, as acknowledged at 4.20, this and the on-
going maintenance activities within the catchment limits the potential benefits
for any new actions.  Unfortunately, it is not always possible to remove all
flood risk in a catchment and some residual flood risk will always remain. This
would remain the case, even if it were possible to implement all of the
potential actions identified in the study. Even if it were possible to remove the
river (or fluvial) flood risk, the risk of surface water and sewer flooding would
remain. The nature of the catchment also means that there is limited scope for
more extensive options. 
4.26 The current Tay Local FRM Plan therefore includes other actions for this area
of Perth including: 
• Sewer flood risk assessment (Scottish Water)
• Perth Surface Water Management Plan
• Community engagement
• Community resilience groups
• Maintenance – of the Perth Flood Scheme, watercourses, drainage
networks, etc.
• Awareness raising 
• Flood forecasting (SEPA) 
• Self-help measures 
• Emergency plans/response 
• Land use planning - managing flood risk through the application of
development planning policy.

Page 6

4.27 The recommendations and conclusions within Amey’s flood study report align
with the actions set out in the current Tay Local FRM Plan. 
4.28 As noted at 4.10, the Perth Surface Water Management Plan is on-going.
While this project covers the whole of the city of Perth, it will give further
consideration to the potential means of managing, and where possible
reducing, surface water flood risk within this catchment. 
4.29 As noted at 4.7, individuals, businesses and communities must play a critical
role in making themselves more resilient and helping to reduce the impact of
flooding. The Tay Local FRM Plan, therefore, includes actions which are
intended to enable communities to act and to become more resilient to
flooding. The flood study has also confirmed that property flood resilience
measures are an effective way for residents and communities to improve their
resilience to flooding and recommends that those in flood affected areas
consider installing these. 
4.30 In order to disseminate the findings of the flood study, and to outline how flood
risk is being managed in the area, community drop-in sessions were held at
the Dewar’s Centre, Perth on 20 and 28 June 2023 from 2 – 8pm. The display
information was also made available on the Council’s consultation hub
between 16 June and 16 July 2023. This allowed the community to view and
comment on the study findings. Further details are provided in Section 4 of
the Annex to this report. 
4.31 The Council will continue to raise awareness of flooding and encourage the
local community and other landowners to become more prepared and resilient
to deal with flooding in the future. 
5. PROPOSALS 
5.1 The Council’s consulting engineers, Amey Consulting Ltd, have
recommended a flood protection scheme to reduce flood risk from the Craigie
Burn at Queen’s Avenue. It is proposed that this scheme is taken forward by
the Council. 
5.2 The recommended flood protection scheme involves two localised actions, as
set out in section 4.22 of this report. 
5.3 The proposed flood protection scheme is noted as Option 6 at 4.18 (and
Option 11 in Appendices 1 & 2) of this report. 
5.4 The Council will continue to manage flood risk in these areas by implementing
the other actions set out in the published Tay FRM Plan and Local FRM Plan.

Page 7

Next Steps 
5.5 The Council will submit details of the proposed scheme to SEPA for
prioritisation (within the national list of flood schemes) and inclusion within the
Cycle 3 Tay FRM Plan and Local FRM Plan covering the period from 2028 -
2034.  This process is essential to secure the necessary capital grant funding
to design and construct the scheme. 
5.6 The Cycle 3 Tay Local FRM Plan should set out the proposed implementation
arrangements for the flood scheme at Queen’s Avenue, Perth, including
timescales and how it will be funded. However, due to the on-going Scottish
Government/CoSLA review of capital funding for flood schemes, and the other
schemes that the Council is already progressing, the timescales and funding
arrangements remain unclear for the time being. The next phases of work to
develop the flood scheme proposals will therefore not commence until this
funding review provides further clarity around capital grant funding and
provision is made within the Council’s capital programme. 
6. CONCLUSION   
6.1 This report provides an update on the outcome of the Craigie Burn flood
study. 
6.2 The Council engaged consulting engineers to carry out this study, which was
included within the Tay Flood Risk Management Strategy and Local Flood
Risk Management Plan. 
6.3 The Council’s consulting engineers have recommended a flood protection
scheme for the Craigie Burn at Queen’s Avenue, Perth. The proposed
scheme is economically viable, and the preliminary proposals consist of
upgrading an existing culvert and channel modifications to reduce the risk of
flooding from the Craigie Burn in Perth. This report, therefore, seeks the
Committee’s approval that the consulting engineer’s recommended proposals
be promoted as a flood scheme for the Craigie Burn, subject to funding. 
Authors
Name  Designation Contact Details
Peter Dickson 
Gavin Bissett
Interim Flooding
Manager 
Engineer (Flooding)
01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
20 November 2023

Page 8

APPENDICES 
• Appendix 1 – Craigie Burn Flood Study – Short List of Potential Options 
• Appendix 2 – Craigie Burn Flood Study – Recommended Option

Page 9

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications 
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(ii) Mental and physical wellbeing
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:- 
(i) Children and young people grow up safe, respected, well-educated,
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities
for all; 
(iii) People can achieve their best physical and mental health and have
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations.

Page 10

2. Resource Implications 
Financial 
2.1 It should be noted that the proposed flood protection scheme at Queen’s
Avenue, Perth will not be implemented at this time. The implementation
arrangements (if known) will be set out in the Cycle 3 Tay Local FRM Plan,
which will cover the six year period from 2028-2034 and is due to be
published in June 2028. Subject to available funding, consulting engineers will
be re-engaged to carry out further investigations and develop the flood
scheme proposals at some time during 2028-2034.  As a result, there are no
immediate resource implications arising directly from the recommendations in
this report. 
2.2 However, the flood risk management planning process will have future
financial implications. The Cycle 3 Tay Local FRM Plan will contain the
implementation arrangements including a timetable for the proposed flood
scheme, who will be responsible for implementing it, as well as how it will be
funded (if known) and coordinated by SEPA and the responsible authorities
over the next six-year cycle from 2028-2034. 
2.3 The 2009 Act requires the Scottish Government to have regard to the FRM
Plans and Local FRM Plans when allocating funds to SEPA and responsible
authorities. The Scottish Government, CoSLA and SEPA agreed the
distribution of capital funding to the actions identified nationally in the Cycle 1
FRM Strategies and Local FRM Plans. The following arrangements currently
apply: 
(i) Only works and schemes that are prioritised in the FRM Plans and
Local FRM Plans are eligible for capital funding.
(ii) Flood protection schemes attract capital grant assistance of up to 80%
of their estimated project cost at tender stage from the Scottish
Government. Local authorities are required to fund the remainder of the
cost of flood schemes.
(iii) The Scottish Government allocates capital funding to local authorities
engaged in flood risk management across Scotland. 80% of this capital
funding will continue to be allocated to flood protection schemes with
the remaining 20% to other actions within the FRM Plans, as detailed
in the Local FRM Plans. This 20% is distributed to the 32 Scottish local
authorities based on the number of properties at risk of flooding and
the estimated annual average flood damages.
2.4 At present, the allocated capital grant is adjusted as the flood scheme
proposals are developed. The estimated costs of flood schemes across
Scotland will therefore continue to be reported to the Scottish Government by
local authorities on an annual basis. 
2.5 These arrangements are currently under review by the Scottish Government
and CoSLA, due to the current projected costs of Cycle 1 flood schemes
across the country, and the available funding.

Page 11

2.6 The Council currently has four flood protection schemes that had been
included in the national priority list for Cycle 1 from 2016-2022 and work on
them continues. However, as a result of the above review, the 4th priority flood
scheme, on the Annaty Burn in Scone, has been paused.  While this scheme
may still progress in the future, it is likely to take longer to implement due to
these funding limitations. 
2.7 No capital funding has been allocated to any new Cycle 2 or 3 flood schemes
in Scotland.  The Council has not made an allocation for its 20% contribution
to the capital costs at this time.  The timescales and funding arrangements for
the proposed new flood scheme at Queen’s Avenue in Perth therefore remain
unclear for the time being. 
2.8 The conclusion of the national review into capital funding for flood schemes is
awaited. In the meantime, COSLA leaders have confirmed that it is expected
that the Local Government General Capital Grant will continue to include
resources allocated for flooding projects, and decisions on quantum and
distribution will be taken by Scottish Ministers and COSLA Leaders nearer the
time. 
2.9 The proposals and cost estimates for the recommended flood scheme at
Queen’s Avenue in Perth still have to be developed through a process of
further investigations, consultation, outline design, the statutory process,
detailed design, tendering and construction. Experience on other similar
schemes has invariably shown that the costs estimated at feasibility stage
always increase. The scheme costs noted in this report are therefore subject
to change and will have to be carefully monitored going forward. 
2.10 There are no current revenue funding implications arising from the
recommendations in this report. 
Workforce 
2.11 There are no workforce implications arising directly from the
recommendations in this report. 
Asset Management (land, property, IT) 
2.12 The proposals in this report have no asset management implications at this
time.

Page 12

3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
3.2 The proposals in this report have been considered under the Corporate
Equalities Impact Assessment process (EqIA) with the following outcome: 
(i) It was determined that the proposals be assessed as relevant with the
following actions taken to reduce or remove the following negative
impacts: 
• The construction works for the proposed flood scheme could
temporarily have a greater impact on mobility impaired, sight
impaired, blind people or disabled people, on children and the
elderly and infirm, and on pregnant women or nursing mothers, in
relation to adverse psychological, physical and health impacts.
Appropriate mitigation measures will be adopted to minimise
disruption, noise, dust and vibration and to ensure adequate safe
access throughout the construction works. 
(ii) The proposals be assessed as relevant and the following positive
outcomes expected following implementation: 
• The proposed flood scheme will have the same positive impact for
all equality groups as the reduction in flood risk to both
communities will provide benefits for all (improved safety, health &
wellbeing through the avoidance of flood impacts and damages) in
the long term. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The matters presented in this report were considered under the Environmental
Assessment (Scotland) Act 2005 and no further action is required as it does
not qualify as a PPS as defined by the Act and is therefore exempt. 
3.5 It is likely that an Environmental Impact Assessment will be required to
support the proposed flood scheme described in this report. This assessment
will be progressed once consulting engineers have been engaged.

Page 13

Sustainability 
3.6 Under the provisions of the Local Government in Scotland Act 2003, the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.7 Following an assessment using the Integrated Appraisal Toolkit, it was
previously determined that the proposal is likely to contribute positively to the
following corporate sustainable development principles: 
(i) Climate Change 
Efficient use of resources now and in the future in the built environment
and service provision (e.g. energy efficiency, land, water resources,
flood defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3) 
Justification:
The flood scheme proposed in this report will help to manage the
increased flood risk in the Queens Avenue area of Perth brought about
by climate change. 
(ii) Community 
Creating a sense of place (e.g. a place with a positive ‘feeling' for
people, and local distinctiveness) (Principle 22) 
Justification:
The flood scheme proposed in the report will help to make the local
community safer and more sustainable for residents, through a
reduction in flood risk. This will help the communities to thrive in the
longer term despite the temporary construction impacts.

Page 14

3.8 Following an assessment using the Integrated Appraisal Toolkit, it was
previously determined that the proposal is likely to contribute negatively to the
following corporate sustainable development principles: 
(iii) Consumption and Resources 
Efficient use of resources now and in the future in the built environment
and service provision (e.g. energy efficiency, land, water resources,
flood defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3) 
Justification:
There will be a short-term increase in the use of materials and
resources during construction of the flood scheme, but a future
reduction due to reduced flood risk. 
Mitigation:
The Environmental Impact Assessment and eventual Construction
Environmental Management Plan will consider energy consumption
and waste management practices during construction. 
Legal and Governance 
3.9 The Head of Legal and Governance has been consulted on this report. 
3.10 The legal basis for the proposals set out in this report in the Flood Risk
management (Scotland) Act 2009. 
Risk 
3.11 Flooding is a natural phenomenon that can never be entirely prevented.
However, the Council is required to manage and, where possible, reduce
flood risk. 
3.12 The flood scheme proposed in this report will reduce flood risk from the
Craigie Burn in Perth. The risks associated with the proposals set out in this
report will be identified and managed through this individual project. 
4. Consultation 
Internal 
4.1 The Head of Legal and Governance and the Head of Finance have been
consulted in the preparation of this report.

Page 15

External 
4.2 SEPA, Scottish Water and all relevant landowners and occupiers were 
consulted on the development of the proposals. 
4.3 In June 2023, a letter was issued to the local elected members, and 585
letters were sent to residents and businesses within the local community. 
This letter directed residents to the Council’s consultation hub, invited them to
the drop-in sessions, and outlined an opportunity to record their views and
questions on comment forms. Social media posts were also arranged through
the Council’s communications team. 
4.4 A summary of the draft outputs from the flood study was placed on the
Council’s consultation hub at
https://consult.pkc.gov.uk/communities/craigieburn from 16 June to 16 July
2023 to allow the community to view and comment on the study findings. This
provided detail on: 
• the risk of flooding from the Craigie Burn in Perth;
• the outcome of the Council’s flood study;
• work to raise awareness of flooding and to help the local community to
become more prepared and resilient to deal with flooding. 
4.5 Community drop-in sessions were held at the Dewars Centre, Perth from 2pm
to 8pm on 20 June and 28 June 2023. These events offered residents the
opportunity to view and comment on the draft outputs from the flood study.
Representatives from the Council’s Flooding Team and Amey were available
at the events to answer questions and provide further information. SEPA,
Scottish Water and the Scottish Flood Forum also attended the first
community drop-in session held on 20 June 2023. A total of 60 residents
recorded their attendance at the drop-in sessions. 
4.6 A total of 50 responses were provided as a mixture of e-mails and completed
comment forms. 
4.7 Understandably, the community expressed frustration that it is not possible to
implement more actions to manage the flood risk across the catchment.  A
wide range of comments were received covering different concerns. Queries
were received regarding the study process, including the hydrology and
modelling work, as well as the options appraisal.  Comments were also
received regarding the existing Perth Flood Protection Scheme and on-going
maintenance within the catchment. Comments were also received regarding
development within the catchment, and its perceived impact on flood risk. 
4.8 The Council has collated all comments and will issue a response to the
community answering all questions raised during the online consultation
period. The Council’s consultation hub will also be updated to confirm the
outcome of this process. Unfortunately, the conclusion of this work has been
delayed due to widespread flooding across the Council area in recent weeks.

Page 16

5. Communication 
5.1 The communication arrangements to date were as noted in Section 4 above. 
5.2 The Council will continue to communicate with the local community, statutory
consultees, local landowners and other stakeholders as the scheme
proposals are developed. 
2. BACKGROUND PAPERS 
2.1 The following background papers, as defined by Section 50D of the Local
Government (Scotland) Act 1973 (and not containing confidential or exempt
information) were relied on to a material extent in the preparation of the above
report; 
• PKC – Environment Committee – 9 September 2015, The Flood Risk
Management (Scotland) Act 2008, Selected Actions and Prioritisation (Report
No 15/359)
• PKC – Environment Committee – 1 June 2016, The Flood Risk Management
(Scotland) Act 2008, Publication of Local Flood Risk Management Plans
(Report No 16/241)
• PKC - Environment and Infrastructure Committee – 23 January 2019, The
Flood Risk Management (Scotland) Act 2009, Publication of Interim Report
(Report No 19/16)
• PKC - Environment and Infrastructure Committee – 19 May 2021, The Flood
Risk Management (Scotland) Act 2009, Second Cycle of Flood Risk
Management Plans (Report No 21/60)
• PKC - Climate Change & Sustainability Committee – 19 December 2022, The
Flood Risk Management (Scotland) Act 2009, Publication of Final Reports
(Cycle 1) & Local Flood Risk Management Plans (Cycle 2) (Report No