Democracy Spraffa

Agenda Document Pack - Climate Change and Sustainability Committee - 23/08/2023

Perth and Kinross Council · 23 August 2023
Back to Climate Change and Sustainability Committee — 23 August 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
16/08/2023 
A hybrid meeting of the Climate Change and Sustainability Committee will be
held in the Council Chamber on Wednesday, 23 August 2023 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Richard Watters  (Convener)
Councillor Liz Barrett  (Vice-Convener)
Councillor Hugh Anderson
Councillor Dave Cuthbert
Councillor Angus Forbes
Councillor David Illingworth
Councillor Noah Khogali
Councillor Grant Laing
Councillor Tom McEwan
Councillor Grant Stewart
Councillor Jack Welch
Page 1 of 40

Page 2

Page 2 of 40

Page 3

Climate Change and Sustainability Committee 
Wednesday, 23 August 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE CLIMATE CHANGE AND
SUSTAINABILITY COMMITTEE OF 31 MAY 2023 FOR
APPROVAL
(copy herewith) 
5 - 8 
4 CARSIE GREEN, BLAIRGOWRIE REWILDING OBJECTION -
PETITION
In line with the PKC Petitions Procedure detailed at (Appendix 3 of
the Standing Orders) a petition on the above had been submitted
for consideration.  A copy of the petition is attached below, along
with an Officer's Briefing Note in response. 
4(i)  COPY OF THE PETITION
(copy herewith 23/221) 
9 - 18 
4(ii)  OFFICERS BRIEFING NOTE IN RESPONSE TO PETITION
(copy herewith 23/222) 
19 - 20 
5 LOCAL HEAT & ENERGY EFFICIENCY STRATEGIES (LHEES)
Presentation by Divindy Grant, Team Leader - Climate Change and
Sustainable Development 
6 SMART LOCAL ENERGY SYSTEMS
Presentation by Graham Pinfield, Smart Perth & Kinross Project
Co-ordinator 
7 NATURE RESTORATION FUND 2023-2024
Report by Head of Planning and Development (copy herewith
23/220) 
21 - 40 
Page 3 of 40

Page 4

Page 4 of 40

Page 5

CLIMATE CHANGE AND SUSTAINABILITY COMMITTEE 
Minute of hybrid meeting of the Climate Change and Sustainability Committee held
in the Council Chambers on 31 May 2023 at 2.00pm. 
Present: Councillors R Watters, L Barrett, H Anderson, D Cuthbert, A Forbes,
D Illingworth, N Khogali, G Laing, T McEwan, G Stewart and J Welch;
Mr J Ferguson, Miss E McGregor and Mr M Mathers. 
In Attendance: B Renton, Executive Director (Communities), M Butterworth,
N Moran, M Lee, R Stewart, G Bissett, L Cassidy, D Grant, A Clegg, J Dick and
S Merone (all Communities); A Taylor, A Brown and R Ramsay (all Corporate and
Democratic Services). 
Councillor R Watters, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor R Watters welcomed everyone to the meeting. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF MEETING OF CLIMATE CHANGE AND SUSTAINABILITY
COMMITTEE OF 15 FEBRUARY 2023 
The minute of meeting of Climate Change and Sustainability Committee of
15 February 2023 was submitted and approved as correct record subject to the
following amendments being made: 
(i) Councillor Forbes be added to the list of those present.
(ii) In Item 4 – where it references writing to MP’s, this be amended to say
both local MPs and MSPs. 
4. ELECTRIC VEHICLE INFRASTRUCTURE FUND – STRATEGY &
EXPANSION PLAN 
There was submitted a report by the Head of Planning and Development
(23/165) (1) noting the work undertaken as part of the Scottish Government’s Electric
Vehicle Infrastructure Fund (EVIF); (2) detailing the preferred future operational
model and associated tariff that will allow for the current and planned Council
infrastructure to be self-sufficient, operating on a more commercial basis; and (3)
highlighting the key next steps including market engagement, procurement and
continued working with partner authorities through the Regional EV Forum. 
Resolved:
(i) It be agreed that officers should commence formal market engagement, and
continue to engage with partner authorities, the Scottish Futures Trust and
3
Page 5 of 40

Page 6

Transport Scotland to secure funding to enable the delivery of the required
infrastructure. 
(ii) The work undertaken on a needs-based assessment of future Electric Vehicle
(EV) infrastructure, and the development of a strategy and expansion plan in
accordance with the Electric Vehicle Infrastructure Fund (EVIF) requirements
be noted.
(iii) The option to move to a tariff plus approach be approved.
(iv) A full report on the EVIF project be provided to a future meeting of the Climate
Change & Sustainability Committee. 
5. FLOOD STUDIES - DUNKELD & PERTH (FEUS ROAD & CAVENDISH
AVENUE/GRAY STREET) 
There was submitted a report by the Head of Environmental and Consumer
Services (23/166) setting out the outcome of the Council’s flood studies in two
separate locations – Dunkeld and Perth (Feus Road and Cavendish Avenue/Gray
Street). 
Resolved:
(i) The completion of the Dunkeld Flood Study and the Perth Flood Study (for
surface water flooding in the vicinity of Feus Road and Cavendish
Avenue/Gray Street), as required by the Tay Flood Risk Management Plan
and Local Flood Risk Management Plan, be noted.
(ii) It be noted that separate public engagement events have been held to
disseminate the findings of each flood study.
(iii) The recommendations of each study, including:
• the proposals for a flood protection scheme in Dunkeld;
• to stop work on surface water flood schemes for Feus Road and
Cavendish Avenue/Gray Street in Perth as they would provide limited
protection and are not economically viable.
be approved.
(iv) It be noted that the Council will continue to manage flood risk in those areas
of Perth by implementing the actions set out in the published Tay Flood Risk
Management Plan and Local Flood Risk Management Plan.
(v) It be noted that details of the recommended flood protection scheme for
Dunkeld will be submitted to SEPA for national prioritisation and inclusion in
the Cycle 3 (2027-2033) Tay Flood Risk Management Plan, to be published in
December 2027, and Tay Local Flood Risk Management Plan, due for
publication in 2028. 
6. MANAGING GRASSED AREAS FOR CLIMATE CHANGE AND
BIODIVERSITY 
There was submitted a joint report by the Head of Environmental and
Consumer Services and the Head of Planning and Development (23/167) outlining
the results of grassland maintenance trials on 42 selected sites, across Perth and
Kinross, which ran during 2021 and 2022.   
Page 6 of 40

Page 7

Resolved:
(i) The creation of a long-term plan and commitment to grassland management,
following the success of the trials in 2021/22 and 2022/23, which would
involve a significant increase in the number of “No Mow” and “Cut and Lift”
sites across Perth and Kinross, be approved.
(ii) It be agreed that the proposed plan be developed in consultation with
community groups and residents and be subject to approval by Committee at
a future meeting. 
7. COMMUNITIES SERVICE ANNUAL PERFORMANCE REPORT 2022/23 
There was submitted a report by the Executive Director (Communities)
(23/168) presenting the Service Annual Performance Report 2022/23 for
Communities and detailing progress against targets and improvement actions over
the last year against the 2022/23 Service Business Management Improvement Plan.   
Resolved:
The Communities Service Annual Performance Report 2022/23, as detailed in
Appendix 1 to Report 23/168, specifically the areas which fall within the remit of the
Climate Change and Sustainability Committee, be approved. 
Page 7 of 40

Page 8

Page 8 of 40

Page 9

1
PETITIONS FORM
If you wish to submit a petition for consideration by Committee, please complete this
template.
Please refer to the Protocol on Petitions before completing the template. If you require
any further information or advice, please contact the Democratic Services Manager
whose details are provided at the end of this form.
Details of Principal Petitioner
Please enter the name of person and organisation (if applicable) raising the petition. Please
include a contact address to which correspondence may be sent, a contact telephone
number and e-mail address if available.
Name: Paul Kenyon
Address: 
Tel No:
E mail: 
Title of Petition  Carsie Green Re-Wilding Objection
Petition Statement - Please state (in no more than 250 words) what action the Petitioner
wishes the Council to take.
As residents of Carsie, we strongly object to the 2nd year of ‘Re-wilding’ the Council is forcing
upon us. This makes the area unsightly, dog owners leaving dog faeces on the long grass,
also encourages ticks – which carry Lyme’s disease plus other and fly-tipping.
It must be costing the council more time and money by cutting paths through parts of the
grass.
We are surrounded by woodland, farms, and golf courses – This ‘Re-wilding project’ seems a
pointless object in the bigger scheme. 
We also understand that Rattray resident also strongly object to this being done on Rattray
Common.
We wish Carsie Green to be fully re-instated to its former glory, by regular grass cutting.
If PKC can provide £280,000 for the UCI Gran Fondo – surely it can make the area look
attractive?
PKC have permitted the West Park development & the latest development of 100 house at
Ardblair – further loss of fields/long term rewilding.
4(i)
Page 9 of 40

Page 10

2
X
Action Taken (if any) to Resolve Issues of Concern before Submitting the Petition
Before a petition is submitted, petitioners are expected to have taken reasonable steps in
attempting to resolve the issues.
Please enter below details of any individuals or organisations approached. Copies of
correspondence, including any responses, should be appended. This information will be
made available to the Committee prior to its consideration of the Petition.
I have written to the Chief Exec of PKC.
A petition handed to Cllr Shiers & Cllr Brawn on Friday 7th July 2023
This has also been discussed at several BRCC meetings – Minutes are attached. Supported
by Blairgowrie & Rattray Community Council.
Appearance before Petitions Committee
Petitioners may have the opportunity to appear before the Committee to speak in support of their
petition.  Petitioners should indicate whether they wish to make a brief statement to the Committee
when it is considering the petition.  Note – Proceedings of meetings of the Council, Committees or
Sub-Committees held in the Council Chamber at 2 High Street, Perth, and which are open to the
public (with the exception of the Licensing Committee) are broadcast live online and recorded /
uploaded to the Council’s YouTube page.
*I DO wish the opportunity to make a brief statement before the Committee
*I DO NOT wish to make a brief statement before the Committee
* tick as appropriate
Signature of Principal Petitioner
When satisfied that the petition meets all the criteria outlined in the Guidance on Petitions, the
Principal Petitioner should sign and date the form in the box below.
Any additional sheets of signatures should be appended to the form.
Signature …… ……………………………………………..   Date 14/07/2023
Name in block capitals …Paul Kenyon………………………………………
Page 10 of 40

Page 11

Page 11 of 40

Page 12

Page 12 of 40

Page 13

Page 13 of 40

Page 14

Page 14 of 40

Page 15

Page 15 of 40

Page 16

Page 16 of 40

Page 17

D Cuthill
Page 17 of 40

Page 18

Page 18 of 40

Page 19

PERTH AND KINROSS COUNCIL 
BRIEFING NOTE 
To:  The Convenor and Members of the Climate Change and Sustainability
Committee 
From: Mark Butterworth – Head of Environmental and Consumer Services 
Date of meeting: 23 August 2023 
OFFICER RESPONSE TO THE PETITION FOR THE REINSTATEMENT OF
GRASS CUTTING AT CARSIE, BLAIRGOWRIE 
1. Background 
1.1 The Petition received from 76 residents of Carsie concerns an objection to the
Council’s policy not to cut the grass on a regular basis and a request that
regular grass cutting be reinstated as soon as possible. 
1.2 Members of the Committee will recall that at its meeting on 31 May 2023 the
following recommendations were agreed with regard to Managing Grassed
Areas for Climate Change and Biodiversity (Report 23/167 refers). 
• approves the creation of a long-term plan and commitment to grassland
management, following the success of the trials in 2021/22 and 2022/23,
which would involve a significant increase in the number of “No Mow” and
“Cut and Lift” sites across Perth and Kinross; and 
• agrees that the proposed plan, be developed in consultation with
community groups and residents, and be subject to approval by
Committee at a future meeting. 
2. Officer Engagement with Petitioner 
2.1 Council officers are aware of the concerns raised within the petition and
officers from both the Council’s Community Greenspace and Grounds
Maintenance Services have been engaging with local residents and ward
members on this matter.  This resulted in a site visit between Councillors
Brawn and McEwan, Council officers and a local biodiversity volunteer on 10
August 2023.  At that meeting, the following was agreed.   
1. The grassland trial areas are to be retained generally but there may be
some further minor modifications to the margins of the grassed areas. 
2. Every effort would be made by the Council’s Grounds Maintenance service
to address the maintenance backlog that currently exists in the area, which
is contributing to the current poor appearance.  
(Report No. 23/222)
4(ii)
Page 19 of 40

Page 20

3. Local biodiversity groups and residents need to be more involved and
supported to develop the trial areas to enhance them with potentially
different cutting regimes, bulbs, wildflowers, shrubs and tree planting. 
4. There needs to be better interpretation of what’s there, linked to
community “get involved” days, including schools on physical improvement
and monitoring activities.  
5. Volunteers need to be supported by Council staff to ensure things are
done safely, people are trained and insured, appropriate equipment is lent
out and returned, materials are provided, site issues are dealt with and
there is good coordination of activities. 
6. An outline action plan is being developed following the site meeting to
cover the points above to ensure that it is properly managed, developed
and coordinated subject to available resources. 
3. Officer’s advice to Committee 
3.1 It is the advice of officers that no changes to the current policy are made as a
result of this Petition, rather that officers continue to engage with local
stakeholders, including the local elected members to develop a sustainable
way forward at Carsie, which would include progressing the agreed actions
listed at 2.1 above. 
3.2 This will help to develop a model going forward, which can be used to assist
with the significant increase in the number of “no mow” areas in the majority of
Council managed parks and open spaces.  This is a new approach to open
space maintenance and a continual learning process for officers and
communities. 
Contact: Andy Clegg, Community Greenspace Manager 
Page 20 of 40

Page 21

PERTH AND KINROSS COUNCIL 
Climate Change & Sustainability Committee 
23 August 2023 
NATURE RESTORATION FUND 2023-2024 
Report by Head of Planning & Development
(Report No. 23/220) 
1. PURPOSE 
1.1 This report provides an update on the Nature Restoration Fund (NRF)
allocation received by Perth and Kinross Council for the 2022/23 and 2023/24
financial years. The report sets out a proposed revised process to use the
funds in the current financial year. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
• Approves the proposed revised process to allocate NRF funding and 
• Delegates the award of funding to the Executive Director (Communities) 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background
• Section 5: Proposals
• Section 6: Conclusion
• Appendices 
4. BACKGROUND – 2022/23 & 2023/2024 ALLOCATION 
4.1 The Nature Restoration Fund (NRF) is a 5-year commitment to fund projects
aimed at “restoring nature and improving biodiversity on land and in the seas.”
The fund includes capital grant funding for local authorities which is now
known as the “Edinburgh Process” strand of the NRF. Originally announced in
the Scottish Government budget 2021/2022, £5m was granted to local
authorities. 
4.2 As reported to this Committee on 24 August 2022 (Report 22/192), in 2022-
2023, Perth & Kinross Council received £176,000. Subsequently, through the
Helping Nature funding stream, the Council applied directly to NatureScot and
received an additional grant of £13,000 for Community Greenspace projects.
The Council therefore received a total of £189,000 in 2022-2023. 
4.3 The final spend allocation was in line with this Committee’s decision in August
2022 for a ratio of up to 60% to Community Greenspace projects and a
7
Page 21 of 40

Page 22

minimum of 40% to community led projects (Report 22/192 refers).  This is as
follows: 
• Community Greenspace £99.5k (53%)
• Tayside Biodiversity Partnership community projects £22.6k (12%)
• Other community projects £66.9k (35%) 
4.4 The detail of the projects supported by the 2022-2023 allocation is contained
in Appendix 2 which has been uploaded to the Council’s website. 
4.5 In 2023-2024, £10 million was granted to local authorities, an increase of £5
million from the previous two years. This constitutes £5 million of capital
funding to be spent in supporting new, or enhancing existing, approaches to
restoring biodiversity, complemented this year by an additional £5 million with
a specific focus on creating Nature Networks. 
4.6 The fourth National Planning Framework set out the Scottish Government’s
expectation that Nature Networks will be put in place in every local authority in
order to enhance biodiversity and better connect areas for nature.   
4.7 A Nature Network is a joined-up system of places important for wild plants
and animals, on land and in water. It allows plants, animals, seeds, nutrients
and water to move from place to place and enables the natural world to adapt
to change, providing plants and animals with places to live, feed and breed.
Effectively functioning nature networks will connect existing nature rich areas
through habitat corridors, habitat ‘stepping stones’, or habitat restoration
areas. Ecological connectivity is provided by wildlife sites, corridors and
stepping stones, landscape features, watercourses, green and blue spaces
that together form integrated nature networks. 
4.8 In 2023-2024, Perth & Kinross Council received £353,000, at least half of which
should be directed towards projects which contribute to a Nature Network. The
allocation was notified in late June 2023, as set out in Appendix 1. 
4.9 The priority themes remain similar to those expressed in the letter allocating
funding for 2022/23.  In addition, NatureScot are encouraging nature positive
applications in urban areas. The ambition to encourage partnership projects
that work at scale and facilitate nature networks to improve habitat
connectivity has also increased. The themes of the 2023/24 fund are: 
• Habitat and species restoration: Management for enhancement and
connectivity.
• Freshwater restoration, including restoration of natural flows in rural
catchments.
• Coastal and marine initiatives which promote restoration, recovery,
enhancement or resilience.
• Control of invasive non-native species (INNS) impacting on nature. 
• Urban: Enhancing and connecting nature across, and between towns and
cities. 
4.10 The fund will seek to deliver these five strategic priorities through local
delivery, in line with the principles of the Edinburgh Process declaration. This
Page 22 of 40

Page 23

approach can deliver multiple benefits, supporting health and well-being, 
green jobs, air and water quality improvements in addition to supporting 
nature recovery. 
5. PROPOSALS 
5.1 As with previous years, the grant has been awarded as General Capital
Grant, with which the Scottish Government has afforded discretion to Local
Authorities to apply the grant within their own rules.   
5.2 Committee agreed in August 2022 the process to allocate NRF funding
including the ratio 60/40 for Greenspace projects and community led projects
respectively (Report No. 22/192 refers). However, following Members’
feedback, it is proposed to select projects with maximum biodiversity impact
for Perth and Kinross and remove the ratio. As such, there will be no
proposed split between Community Greenspace and Community projects, as
those that best support outcomes for nature, in line with our scoring criteria,
will be recommended for approval. 
5.3  The main points of the proposed process are: 
• Projects by Community Greenspace and other internal departments are to
set out their individual projects with a description, outline of biodiversity
benefits, any positive co-benefits, if/how they contribute to a nature
network, cost, details of location, maintenance agreement, and community
involvement in a spreadsheet. 
• Projects in the community must submit a detailed application form. 
• Project applications will be invited with a minimum value of £1,000. There
will be no upper limit to promote accurately costed proposals. 
• At the end of the application deadline, the NRF co-ordinator will assess the
projects against the project checklist and provide comments for the
internal Council NRF working group. All applications will be assessed by
the NRF working group against set scoring criteria. This criteria matrix is
shown in Appendix 3. 
• The NRF working group will review all applications and recommend those
that score the highest to the Executive Director (Communities). 
• The NRF working group will also take into consideration the geographic
spread of projects and aim to encourage projects across Perth and
Kinross.
• Once recommendations have been approved by the Executive Director
(Communities), funding will then made available to successful applicants. 
• The NRF working group will work with all applicants to ensure approved
nature restoration projects are taken forward. 
Page 23 of 40

Page 24

5.4 Use of the Nature Restoration Fund to support community groups, Community
Greenspace and other services, the Council is helping to deliver on its
obligations in accordance with the Biodiversity Duty under the Nature
Conservation (Scotland) Act 2004. It also empowers communities to
undertake projects that will make a significant difference in areas that are of
value to them, in line with the Perth and Kinross Offer. 
5.5 Due to the seasonal nature of many biodiversity projects, to avoid delays and
maximise the ability to deliver, particularly for community led projects, and in
consultation with the Committee’s Convener, the NRF application process has
already been opened with a deadline of 4 September 2023 (Nature
Restoration Fund - Perth & Kinross Council (pkc.gov.uk). 
5.6 It is recommended that the Committee approves the proposed revised
process and notes that that award of funding be delegated to the Executive
Director (Communities) in line with previous practice. 
6. CONCLUSION 
6.1 The Council and community partners successfully delivered on the 2022/23
Nature Restoration Fund grant award, delivering biodiversity enhancement
across Perth and Kinross. In 2023/24, the Council has been allocated
£353,000 to support nature restoration and the development of nature
networks. A revised process including removing the ratio between Community
Greenspace and community groups projects is proposed based on feedback
from elected members last year. 
Authors
Name  Designation Contact Details
Hannah Wilson  Climate Change &
Sustainable Development
Graduate 
(01738) 475000
ComCommitteeReports@pkc.gov.uk
Divindy Grant  Climate Change &
Sustainable Development
Team Leader 
Approved 
Name Designation Date
Barbara Renton Executive Director (Communities) 7 August 2023 
APPENDICES 
• Appendix 1 – Letter from Scottish Government to Chief Executive Perth &
Kinross Council 29 June 2023. 
• Appendix 2 – Nature Restoration Fund 2022-2023 Report
• Appendix 3 – Criteria Scoring Matrix 
Page 24 of 40

Page 25

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Climate Change Assessment Yes
Strategic Environmental Assessment None
Sustainable Procurement & Supply Assessment None
Equality & Fairness Assessment None
Child Rights & Wellbeing Assessment None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The outcomes of the proposal whether led by Community Greenspace or
organisations in the Community will help create a safe and sustainable place
for future generations by enhancing areas of nature so that people can enjoy
these into the future. Habitat restoration accompanied by additional planting
also provides climate change mitigation; and by restoring native habitats
wildlife and plant life is provided resilience in the face of a changing climate
supporting their ability to in turn sustain their ecosystems and the services
they provide. The proposal to support communities in delivering nature
restoration projects of importance to them, helps develop educated and
informed citizens, and supports people to lead independent healthy and active
lives by increasing awareness of and engagement with nature, and promoting
ownership and a sense of inclusion and ownership of projects they and their
communities are involved in. 
Corporate Plan 
1.2 See above. 
2. Resource Implications 
Financial 
2.1 In 2023-2024, Perth & Kinross Council received £353,000. The allocation was
notified in late June 2023, as set out in Appendix 1.
Page 25 of 40

Page 26

Workforce 
2.2 None. 
Asset Management (land, property, IT) 
2.3 None. 
3. Assessments 
Climate Change Assessment 
3.1 Under the Climate Change (Scotland) Act 2009 and the Climate Change
(Emissions Reduction Targets) (Scotland) Act 2019, the Council has a duty to
contribute to reducing Scotland's greenhouse gas emissions in line with
national targets, help deliver Scotland's climate change adaptation
programme and act to promote sustainable development. To comply with this
duty, it is essential that climate change be considered at the heart of all
Council processes and decisions using climate change impact screening. 
3.2 This proposal was considered to have a positive impact on how Land Use and
Land Use Change processes respond to climate change. For example,
promoting more sustainable management and maintenance regimes for
greenspace (reduced herbicide use, increased grassland, reduced cutting).
The proposal was also considered to have a positive impact on reducing
emissions through carbon capture. The proposal also considered a positive
Climate Resilience & Engagement Impact in ensuring biodiversity,
ecosystems and landscapes are protected from and adaptable to the
changing climate. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The proposals have been considered under the Act and no further action is
required as it does not qualify as a PPS as defined by the Act and is therefore
exempt. 
Sustainable Procurement & Supply Assessment 
3.5 Under the Procurement Reform (Scotland) Act 2014, the Council has a duty to
consider sustainable procurement as part of it's procurement process. The
Council is required to consider how in conducting the procurement process it
can - (i) improve the economic, social, and environmental wellbeing of the
authority's area, (ii) facilitate the involvement of small and medium
enterprises, third sector bodies and supported businesses in the process, and
(iii) promote innovation. 
Page 26 of 40

Page 27

3.6 This proposal was considered under the Council’s Impact and Value
Assessment. No impacts on sustainable procurement and supply were
identified. 
Equality & Fairness Assessment 
3.7 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Under Part 1 of the Act ‘The Fairer Scotland Duty’,
the Council is required to actively consider how it can reduce inequalities of
outcome caused by socioeconomic disadvantage, when making strategic
decisions. 
3.8 This proposal was considered under the Council’s Impact and Value
Assessment. No impacts on equality were identified and the document was
assessed as not relevant for the purposes of EFIA. 
Child Rights & Wellbeing Assessment   
3.9 The United Nations Convention on the Rights of the Child (UNCRC) was
ratified by the UK Government in 1991. It sets out the civil, political, economic,
social and cultural rights that all children, everywhere, are entitled to and is
regarded as the global “gold standard” for children’s rights. Screening for
Child Rights and Wellbeing Impacts, alongside the Getting it Right for Every
Child  (GIRFEC) wellbeing indicators ensures that Council policies protect
and promote the rights and wellbeing of children and young people.   
3.10 This proposal was considered under the Council’s Impact and Value 
Assessment. No impacts on Child Rights and Wellbeing were identified. 
4. Consultation 
Internal 
4.1 This report has been informed by discussions with members of Planning &
Housing Strategy, Climate Change & Sustainable Development, Community
Greenspace, and Tayside Biodiversity Partnership. 
External 
4.2 N/A. 
5. Communication 
5.1 A webpage has been set up on the Council website at
www.pkc.gov.uk/naturefund. Social media has been used by the Council and
TBP to promote the success of the previous year’s fund. These channels will
be used once receipt of funding from NatureScot has been received to invite
applications for the current year. Further ongoing communications will inform
the public of key stages of the fund as well as progress of projects. 
Page 27 of 40

Page 28

Page 28 of 40

Page 29

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
Environment and Forestry Directorate
Deputy Director
Nature Division 
E: DDND@gov.scot 

Mr Thomas Glen
Chief Executive
Perth and Kinross Council 
By e-mail only 
___ 
29 June 2023 
Dear Mr Glen, 
ALLOCATION OF THE ‘EDINBURGH PROCESS’ STRAND OF THE NATURE
RESTORATION FUND AND SEED FUNDING FOR NATURE NETWORKS  
I am writing to inform you that the Scottish Government and Local Authority Leaders have
reached an agreement on the proportion of this year’s allocation of the Nature Restoration
Fund (NRF) to Scottish Local Authorities, known as the Edinburgh Process strand of the
NRF. This constitutes £5 million of capital funding to be spent in 2023-24 to support new, or
to enhance existing, approaches to restoring biodiversity, complemented this year by an
additional £5 million with a specific focus on creating Nature Networks. 
Purpose of funding 
The draft Scottish Biodiversity Strategy defines the Outcomes we need to see in order to
achieve our high-level goals of being nature positive – halting biodiversity loss – by 2030,
and substantially restoring it by 2045. The Strategy also sets out the need for a whole-of-
society approach to achieving these goals, in line with the Edinburgh Process. NRF-funded
projects are a key delivery mechanism for the Strategy. 
The strategic goal of the Nature Restoration Fund (NRF) is to catalyse action at scale
to protect and restore Scotland’s biodiversity on land and sea, with a focus on outcomes
which address the main drivers of the decline in biodiversity: over-exploitation of the natural
environment and addressing its consequences; habitat loss and fragmentation; and invasive
non-native species.   
The Fund has five strategic themes that will be delivered across all the funding streams:
▪ Habitat and species restoration: Management for enhancement and connectivity.
▪ Freshwater restoration, including restoration of natural flows in rural catchments
▪ Coastal and marine initiatives which promote restoration, recovery, enhancement or
resilience
▪ Control of invasive non-native species (INNS) impacting on nature
▪ Urban: Enhancing and connecting nature across, and between, towns and cities. 
The fund will seek to deliver the five strategic priorities through sub-national delivery, in line
with the principles of the Edinburgh Process declaration. This approach can deliver multiple
APPENDIX 1 7
Page 29 of 40

Page 30

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
benefits, supporting health and well-being, green jobs, air and water quality improvements in
addition to supporting nature recovery.   
Nature Networks 
The high level expectation for projects being delivered through the Edinburgh Process strand
remains the same. However, this year, we are also providing an additional £5 million capital
funding with a view to Local Authorities beginning to develop projects which will contribute to
establishing Nature Networks in their area. The fourth National Planning Framework set out
the Scottish Government’s expectation that Nature Networks will be put in place in every
local authority in order to enhance biodiversity and better connect areas for nature.
Ecological connectivity is provided by wildlife sites, corridors and stepping stones, landscape
features, watercourses, green and blue spaces that together form integrated nature
networks.  More information on nature networks can be found at Annex B.   
Funding Mechanism 
All Local Authorities, plus the National Parks, will receive a capital allocation directly from the
Scottish Government. The total value of the allocation to Local Authorities is £10 million in
2023-2024, an increase of £5 million from the previous two years. Given the strategic
themes and the priority of ecological connectivity, the distribution methodology this year is
once again based on: 
• 50% on ‘area of natural greenspace’ and 50% on NatureScot composite indicator. 
The allocation of funds for Perth and Kinross Council in 2023-24, which will be paid as
General Capital Grant on 15 July, is £0.353 million rounded, at least half of which should be
directed towards projects which contribute to a Nature Network. 
In addition to this direct allocation through the Edinburgh Process strand, the NRF includes a
competitive grants scheme run by NatureScot. Partnerships which include local authorities
will also be eligible to apply to the competitive schemes but local authorities and other public
bodies will not be eligible as sole applicants. 
As in previous years, Local Authorities will be required to complete and return a short form to
the Biodiversity Unit at the Scottish Government within a year of the allocation of funding. 
I would like to thank you all for your collaboration in delivering these key outcomes for our
Biodiversity Strategy and would be most grateful if you could pass a copy of this letter onto
any persons that would be responsible for administering the NRF in your local authority. 
Yours sincerely, 
Cate Turton
Deputy Director, Nature Division 
Page 30 of 40

Page 31

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
Annex A 
NATURE RESTORATION FUND – EDINBURGH PROCESS STRAND – 2023-24 
LOCAL AUTHORITY ALLOCATION
(£m)
Aberdeen City 0.270 
Aberdeenshire 0.445 
Angus 0.306 
Argyll & Bute 0.489 
Clackmannanshire 0.195 
Dumfries & Galloway 0.490 
Dundee City 0.171 
East Ayrshire 0.206 
East Dunbartonshire 0.266 
East Lothian 0.223 
East Renfrewshire 0.121 
Edinburgh, City of 0.272 
Eilean Siar 0.255 
Falkirk 0.348 
Fife 0.612 
Glasgow City 0.247 
Highland 0.676 
Inverclyde 0.306 
Midlothian 0.211 
Moray 0.246 
North Ayrshire 0.355 
North Lanarkshire 0.556 
Orkney 0.106 
Perth & Kinross 0.353 
Renfrewshire 0.199 
Scottish Borders 0.328 
Shetland 0.161 
South Ayrshire 0.189 
South Lanarkshire 0.545 
Stirling 0.228 
West Dunbartonshire 0.257 
West Lothian 0.368  
10.000 
Page 31 of 40

Page 32

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
Annex B 
NATURE NETWORKS FOR SCOTLAND 
We are facing both a climate and nature crisis. The biodiversity crisis is of urgent concern
within Scotland where 49% of species are in decline. Climate change and nature are
inextricably linked, and we cannot address one without the other. In order to create a nature-
rich, climate resilient, net zero Scotland we must restore and connect our valuable habitats
and appropriately value the ecosystem services that nature provides.   
The Scottish Biodiversity Strategy to 2045 (SBS) sets out actions needed to halt biodiversity
loss by 2030 and to restore and regenerate biodiversity by 2045.  Nature Networks across
our landscapes will underpin the resilience and health of our habitats and species.   
A priority action within the SBS is to ensure that every local authority area has a nature
network to improve ecological connectivity across Scotland.  We aim to develop an evolving,
flexible nature network for Scotland, connecting nature-rich areas to allow wildlife and natural
process to adapt to land use and climate change pressures. A wide range of exemplars
already exist and the fourth National Planning Framework states that nature networks will
help build people’s connection to nature, providing biodiversity-rich spaces that deliver local
benefits, and meet the priorities of local communities for nature and climate change.   
Nature Networks will allow Local Authorities to;
• Deliver the commitments of the Edinburgh Declaration;
• Contribute towards global and national biodiversity and climate targets;
• Meet Biodiversity and Climate Duty obligations;  
• Deliver positive effects for biodiversity through NPF4 policies;
• Potentially achieve multiple co-benefits for local communities, including provision of
high quality green and blue spaces including active travel networks, flood risk
mitigation, cleaner waterways, cleaner air, increased biodiversity, sustainable local
food production. 
Local partnerships are needed to drive forward nature network development and Local
Authorities can play a key role, facilitating partnership working and involving communities in
identifying local priorities for nature, ensuring that local knowledge informs those priority
areas. 
Whilst delivery of Nature Networks is not the sole responsibility of Local Authorities, many of
the levers to inform and enable the spatial identification of areas that provide opportunity for
addressing biodiversity loss already exist, e.g. Local Development Planning, Local
Biodiversity Action Plans and Partnerships, Climate Adaptation Networks. Where nature
restoration priorities align with local priorities, e.g. Climate Adaptation, Transport, Active
Travel, Public Health, etc., there may be opportunity to develop new, or better integrated
delivery partnerships.   
We recognise there are challenges which Local Authorities will need to overcome to develop
their Nature Network and we are committed to help address those where possible. The
Scottish Government is exploring options to provide a central advice/ expertise hub which
partnerships can draw upon as needed, and we are allocating capital funding through the
NRF in 2023-24 for local nature restoration projects that contribute to nature networks. 
Page 32 of 40

Page 33

PKC Nature Restoration Fund 2022-23 Report. May 2023. NatureFund@pkc.gov.uk  1 
Perth & Kinross Nature Restoration Fund 2022-23 Report 
In May 2022, the council received £176,000 from the Scottish Government Nature
Restoration Fund (NRF). The purpose of the fund is to address the biodiversity crisis
and its causes - habitat loss and fragmentation, and invasive species - while
recognising the need to address both climate change and biodiversity crises at the
same time. Perth and Kinross Council also applied to the Helping Nature funding
stream to receive an additional grant of £13,000 for Community Greenspace
projects. The total NRF grant received by the Council in 2022-2023 was £189,000.
Application of the fund demonstrates the Council’s commitment shown in
declaring a climate emergency and the signing of the Edinburgh Declaration and
provided an opportunity to deliver on the PK Offer both through community
involvement and in making Perth and Kinross a better, greener place. 
Community Greenspace had several projects ready to implement including forest
plan works, investment in equipment for maintaining wildflower areas, clearance
of scrub at grassland and heathland sites, removal of invasive non-native species,
tree planting, and pollinator friendly planting at closed cemeteries. The additional
grant through the Helping Nature funding stream funded invasive non-native
species removal at the Tay & Craigie Burn and forest plan works at Alyth Den. 
Funding was then open for community partners and other internal
partners to apply to. Great work was carried out by the Tayside
Biodiversity Partnership, Rewilding Denmarkfield, Beautiful Perth, Crook
and Drum Growing Together, Glassie Bike Park, Kinross-shire Civic Trust,
Comrie Primary School and Parent and Friends Association, Highland
Perthshire Communities Land Trust, Loch Rannoch Conservation
Association, and Luncarty Primary School. Their hard work included
introducing native trees and hedgerows, wildlife ponds and scrapes,
beebanks, and pollinator friendly plants in schools, creating and
enhancing SuDS ponds and wetlands for amphibians and dragonflies,
restoring riparian habitat through landscape-scale invasive non-native
species control work, creating a species rich grassland corridor,
extending a community orchard, lots of pollinator friendly planting and
native tree planting across greenspaces. 
A special note should be made of:
• the involvement of Rewilding Denmarkfield, Royal Highland Education Trust, teachers, pupils, and
local community members in the delivery of Comrie Primary Schools “Rewilding Comrie” project and
Luncarty Primary Schools “Rewild my school” project.
• the wetland restoration works of the Kinross Raingardens trail.
Beautiful Perth volunteers restoring
riparian habitat
Tree planting at Jeanfield 
“Thanks to the NRF, we have
restored a 3.15ha Species Rich
Grassland (SRG) corridor,
connecting our pollinator-friendly
community orchard to the semi-
ancient oak woodland. We look
forward to using the SRG area to
engage and educate people with
the enhanced habitat and
increased diversity of pollinators
and plants through our Friends of
Denmarkfield community group
and our education sessions for
local primary school children.” Ellie
Corsie, Rewilding Denmarkfield.
Appendix 2 7
Page 33 of 40

Page 34

PKC Nature Restoration Fund 2022-23 Report. May 2023. NatureFund@pkc.gov.uk  2 
• the partnership project between Tayside Biodiversity, Scottish Invasive Species Initiative, and Perth
and Kinross Council that recruited 35 volunteers to undertake catchment wide giant hogweed
control at the river Almond.
• the wide involvement of volunteers who helped deliver many of the projects.
Nature Restoration Fund (NRF) 2023/2024
In late June 2023, Perth and Kinross Council received our NRF allocation of £353,000. This year the theme of
the fund remains the same - catalysing action at scale to protect and restore Scotland’s biodiversity on land
and sea, with a focus on outcomes which address the main drivers of the decline in biodiversity. However, at
least half of this funding is to be spend on developing nature networks. Effectively functioning nature
networks will connect existing nature rich areas through habitat corridors, habitat ‘stepping stones’, or
habitat restoration. On receipt of 2023/2024 funding, the NRF application process will reopen early July with
applications invited across the Council area for capital funding for projects. The application process will close
on Sunday 20th August. For further information please go to www.pkc.gov.uk/naturefund.
This year, all applications are to be reviewed against set scoring criteria. Once the application deadline has
passed, the highest scoring applications will be recommended for approval to the Executive Director of
Communities. This year there will be no proposed split between Community Greenspace and Community
projects, as those that best support outcomes for nature, in line with scoring criteria, will be recommended
for approval. Once recommendations have been approved by the Executive Director of Communities,
successful applicants will be notified of their grant funding award. 
2022-2023 Nature Restoration Projects List 
Community Greenspace
Forest Plan Works at Aberfeldy, The Knock, Alyth Den,
Blackspout Woods, and St Magdalenes Hill, Lady
Mary’s Walk
Enhancing six sites across Perth and Kinross by
removing non-native and invasive species, enhancing
the natural ecosystem. Works to restore our natural
forest habitat included the removal of beech and
sycamore saplings, removing broom to re-establish
heathland habitat, coppicing trees, and ring-barking
trees to create standing deadwood, a rare and
important habitat for biodiversity. 
Removal of Giant Hogweed and Japanese
Knotweed from the Craigie Burn and Tay 
Invasive non-native plants out-compete native
species and cause stream bank erosion in riparian
areas when the large shading plant dies back late
in the year leaving riverbanks exposed to the
elements. By bringing these plants under control
we reduce negative environmental and human
health impacts, increase our native floral
biodiversity, and restore our riparian habitats.
Page 34 of 40

Page 35

PKC Nature Restoration Fund 2022-23 Report. May 2023. NatureFund@pkc.gov.uk  3 
Investment in Machinery
Purchase of pedestrian machinery with interchangeable
flail head & scythe attachment. This will be made
available to path groups for maintaining the core path
network with the flail head and the scythe attachment
for emerging meadow management groups. 
Kinnoull Hill SSSI 
Scrub and trees were removed from heathland
areas to improve the habitat. Scrub and trees were
also removed from meadow areas at Barnhill &
Rosehill to keep previously cultivated areas from
succession. This involved scraping back of
Blaeberry, broom and gorse. 
Meadows and Grassland – St Magdalenes Hill
Scrub was removed from meadows and other grassland
areas. Removing scrub protects the meadow and
grassland areas from progressing into a woodland.
These areas are hugely important for biodiversity,
supporting a diverse range of plant and animal species. 
Jeanfield Flood Prevention 
Tree planting to help with flood prevention, using
nature-based solutions to mitigate the ever-
increasing flooding issues at this location. These
trees will help to increase water absorption, catch
rainfall and slow down surface water run-off. 
Closed Cemeteries Management
Works undertaken at 4 closed cemeteries and 1 new
extension cemetery (Kinross North Cemetery). This
involved the selective removal of invasive species and
the creation of new areas for pollinators. 
Page 35 of 40

Page 36

PKC Nature Restoration Fund 2022-23 Report. May 2023. NatureFund@pkc.gov.uk  4 
Education Services
Rewilding Comrie, Comrie Primary School and Parent
and Friends Association
Planting of a variety of plants and seeds to support
biodiversity. With wild grass/flowers seeds spread, the
area has been rejuvenated. The scrape built into the
centre will also collect water naturally to help further
support the plants and animals around. Two volunteers
from RHET came along on the planting day for children
and members of the community to learn about soil and
planting, helping to put knowledge into practice with
creating the rewilding area. 
Rewild Our School, Luncarty Primary School
In conjunction with Rewilding Denmarkfield,
Luncarty Primary developed an outdoor space to
create opportunities for wildlife and to encourage
biodiversity. They created a pond with aquatic
planting, planted two vast wildflower beds,
created a willow tunnel for exploration, a bee bank
and planted a hedgerow around the perimeter of
the playground area. Bringing nature and wildlife
into the school grounds has provided nature
connection opportunities through unstructured,
creative play and curriculum-based environmental
education sessions. 
Community Organisations 
River Almond Giant Hogweed Project, Tayside
Biodiversity Partnership 
This partnership project brought together Scottish
Invasive Species Initiative (SISI), the Tayside Biodiversity
Partnership and Perth & Kinross Council to put a
programme of control in place to remove invasive
species from the Almond. This conservation work is
restoring the riparian habitat and increasing
biodiversity. Time and support were invested into
building a network of enthusiastic local volunteers,
providing them with skills, training and qualifications to
help undertake control work. Control work started from
the source in Buchanty, and continued all the way down
the river to where the Almond meets the Tay. 
Page 36 of 40

Page 37

PKC Nature Restoration Fund 2022-23 Report. May 2023. NatureFund@pkc.gov.uk  5 
SuDS Pond Enhancement, Tayside Biodiversity
Partnership
Five Ponds were cleared of non-native or invasive
vegetation to create areas of open water and
improve conditions for toads, frogs and newts,
dragonflies, and pollinators; native wildflowers
were planted as food for pollinators. Help was
provided from many local volunteers, the PKC
Biodiversity Ambassadors, community groups,
developers and schools. 
Wildflower Meadow Creation, Rewilding Denmarkfield
Restoring a 3.15ha Species Rich Grassland corridor
along the northern boundary of Rewilding
Denmarkfield, connecting their pollinator-friendly
community orchard to the semi-ancient oak woodland.
This 3.15ha of SRG will act as a “seed island” in that it
will facilitate other areas of the site to be colonised by
native flowering plants in the future. Rewilding
Denmarkfield will also continue to conduct weekly
butterfly, bee and amphibian transect surveys to
determine the positive impact on pollinators and
amphibians. 
Riverside Heather Garden Riparian Restoration,
Beautiful Perth
The stream in Riverside Heather Garden was
devoid of marginal planting for a strip of
approximately 1.5m width. This project restored
planting in this area to create a more diverse
riparian habitat. Native species that are good for
pollinators were planted by Beautiful Perth
volunteers to enhance the biodiversity of the area. 
Crook of Devon Community Orchard and Pollinator
Project, Crook and Drum Growing Together
Expanding a community orchard with mixed fruit trees
and underplanting with wildflowers and bulbs with the
aim of creating a pollinator corridor. All the planting and
associated works were carried out by volunteers of
Crook and Drum Growing Together.     
Page 37 of 40

Page 38

PKC Nature Restoration Fund 2022-23 Report. May 2023. NatureFund@pkc.gov.uk  6 
Kinross Rain Gardens Trail, Kinross-shire Civic
Trust
Wetland restoration was conducted in three areas
to continue the Kinross Raingardens Trail, which
will ultimately stretch all the way to Loch Leven.
The creation of new pools creates habitat for
amphibians as well as carbon sinks and increases
water storage capacity in flood events. Volunteers
from the Kinross-shire Civic Trust and Kinross in
Bloom helped to plant native aquatic plants and a
wildflower meadow for pollinators. 
Glassie Bike Park Rewilding, Glassie Bike Park
With the woodland previously devastated from storm
Arwen, this area was planted up with native tree
species to help restore the habitat and enhance
biodiversity. The new woodland area will also make a
good wind break and sheltered areas for walkers and
bikers on the new paths created. Some standing dead
trees were left to let more light into the woodland floor
to assist its natural regeneration. 
Dun Coillich Wetlands, Highland Perthshire
Communities Land Trust
An ecological report was conducted advising on
the best ways to improve wetland habitats at Dun
Coillich. It contained recommendations to increase
water levels through the construction of a series of
hand-built dams and extend the existing wildlife
ponds/scrapes. The existing scrapes were
enhanced by volunteers clearing encroaching
vegetation and raising water levels by blocking
channels draining the scrapes. This work means
that this wetland habitat, which is important for
dragonflies and amphibians, will be maintained for
years to come. 
Rannoch and Tummel Firepit and Scorch Mark
Restoration, Loch Rannoch Conservation Association
Planting native trees to replace those cut down by
visitors to burn on fires,  restoring the native loch shore
woodland. Ash contaminated soil was removed from
the scorch marks and replaced with sterile soil and
native grass seeds and wildflowers were sown to
restore the woodland undergrowth. Small areas were
temporarily fenced off, preventing footfall and further
damage.   
Page 38 of 40

Page 39

Assessment Criteria Super (4) High (3) Medium (2) Low (1) None (0) Project Score Possible Score Weighting
Weighting
applied
Essential (must score at least 1 for each category)
Biodiversity (4)* - Extent to which the project  
delivers at least one of the funds five strategic
themes. Will consider the overall biodiversity value
of the project.
*As the main essential criteria, this will carry a
higher weighting.
Delivers at least one of the five
strategic themes. A
transformational project that
delivers significant benefit for
biodiversity.
Delivers at least one of the five
strategic themes. The overall
approach and strategy shows
significant benefit for
biodiversity.
Delivers at least one of the five
strategic themes. The overall
approach and strategy shows clear
additional benefit for biodiversity.
Delivers at least one of the five
strategic themes. The overall
approach and strategy shows a
direct benefit for biodiversity.
Does not deliver one of
the five strategic
themes. No
biodiversity benefit. 4 1.5 0
Return on Investment (2) - Extent to which the
project is good value for money. The funding used
will aim to maximise the biodiversity value of the
project. Good value for money
Value for money proportionate to
funding sought Poor value for money 2 1 0
Maintenance (2) - Extent to which the project will
deliver impact/benefit beyond the funding period
through  long term maintenance.
No maintenance required or
maintenance solution in place for at
least 10 years
Maintenance is required 
and agreed in principle or short
term.
No maintenance
agreed 2 1 0
Non-essential
Nature Networks (2) - Extent to which the project
helps to deliver nature networks.
Project will significantly deliver high-
quality and well-connected nature-
rich areas.
Project will have a moderate
impact in delivering high-quality
and well-connected nature-rich
areas
Does not specifically
contribute towards the
delivery of nature
networks. 2 1 0
Legacy (2) - Extent to which the project will deliver
positive co-benefits e.g. supporting community
well-being and access to nature, green jobs, air
and water quality improvements.
Multiple long term co-benefits will
be delivered
Few co-benefits will be delivered
or only short term
No co-benefits will be
delivered 2 1 0
Supports Tayside LBAP (2)
Directly contributes towards Tayside
LBAP action(s).
Positive contributions towards
aims in the Tayside LBAP.
Does not support a
Tayside LBAP Action 2 1 0
Engagement and Support (2) - Extent to which the
project has community support and participation.
Project is community led or the
community is participating in the
project
Community supports
project but is not
involved
No evidence for
community support or
involvement 2 1 0
Climate change mitigation and adaptation (1)
Significantly contributes towards
climate change mitigation and/or
adaptation
Does not specifically
contribute towards
climate change
mitigation and/or
adaptation 1 1 0
Multi-year project (1) Multi-year project One year project 1 1 0
Maximum points
after weighting 20 Project Score 0
APPENDIX 3 7
Page 39 of 40

Page 40

Page 40 of 40