Appendix 4 – Flooding at Cavendish Ave-Gray St, Perth
Perth and Kinross Council · 31 May 2023
Back to Climate Change and Sustainability Committee — 31 May 2023 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
Appendix 4 – Flooding at Cavendish Avenue/Gray Street, Perth Advantages • Works would protect properties from flooding up to the 1 in 30 year rainfall event; • Removal of surface water from combined sewer system has wider benefits – reduced water treatment energy use/CSO spills; Disadvantages • Limited standard of protection – risk of flooding remains during events above design standard (30 year storm event) although the option would reduce the frequency and total volume of flooding; • No allowance for increase in future flood risk due to the effects of climate change; • High Capital cost (£8.6m) – refinement of option estimates indicate that this will increase further; • Benefit cost ratio (0.045) is well below 1 .0 – the estimated cost of the works therefore greatly exceeds the potential benefits over time. The works are therefore not economically viable.