Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
13/12/2022 
A hybrid special meeting of the Climate Change and Sustainability Committee will
be held in the Council Chamber on Monday, 19 December 2022 at 10:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Richard Watters  (Convener)
Councillor Liz Barrett  (Vice-Convener)
Councillor Hugh Anderson
Councillor Dave Cuthbert
Councillor David Illingworth
Councillor Noah Khogali
Councillor Grant Laing
Councillor Tom McEwan
Councillor Crawford Reid
Councillor Grant Stewart
Councillor Jack Welch
Page 1 of 354

Page 2

Page 2 of 354

Page 3

Climate Change and Sustainability Committee 
Monday, 19 December 2022 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 THE FLOOD RISK MANAGEMENT (SCOTLAND) ACT 2009:
PUBLICATION OF FINAL REPORTS (CYCLE 1) AND LOCAL
FLOOD RISK MANAGEMENT PLANS (CYCLE 2)
Report by Head of Environmental and Consumer Services (copy
herewith 22/307) 
5 - 354 
Page 3 of 354

Page 4

Page 4 of 354

Page 5

PERTH AND KINROSS COUNCIL 
Climate Change & Sustainability Committee  
19 December 2022 
THE FLOOD RISK MANAGEMENT (SCOTLAND) ACT 2009:
PUBLICATION OF FINAL REPORTS (CYCLE 1) & 
LOCAL FLOOD RISK MANAGEMENT PLANS (CYCLE 2) 
Report by Head of Environmental & Consumer Services
(Report No. 22/307) 
1. PURPOSE 
1.1 The Council’s duties with regard to flooding are set out within the Flood Risk
Management (Scotland) Act 2009.  The report provides an update on the
recent national public consultation on flood risk management, the publication
of SEPA’s Flood Risk Management Plans.  It also seeks the Committee’s
approval of the content of the Final Reports and Local Flood Risk
Management Plans. These are required to be published by 31 December
2022.   
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
(i) endorses the progress made on delivering the Local Flood Risk
Management Plans published in June 2016 as set out in the Cycle 1
Final Reports.
(ii) approves the content of the Cycle 1 Final Report on the Local Flood
Risk Management Plan for the Tay District and the Council’s input to
the Cycle 1 Final Reports for the Forth, the Forth Estuary and the Tay
Estuary & Montrose Basin Districts.
(iii) approves the content of the Cycle 2 Local Flood Risk Management
Plan for the Tay District and the Council’s input to the Cycle 2 Local
Flood Risk Management Plans for the Forth, the Forth Estuary and the
Tay Estuary & Montrose Basin Districts.
(iv) authorises the Executive Director (Communities) to carry out final
minor amendments to the presentation of the above Cycle 1 Final
Reports and Cycle 2 Local Flood Risk Management Plans prior to final
publication on 21 December 2022, if required.
(v) approves the proposed arrangements for publication of the Cycle 1
Final Reports and Cycle 2 Local Flood Risk Management Plans. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
3
Page 5 of 354

Page 6

• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 The approach to tackling flooding in Scotland has changed in recent years.
The Flood Risk Management (Scotland) Act (the 2009 Act) has introduced a
more modern, coordinated and sustainable approach to flood risk
management at both national and local levels. 
4.2 Although public authorities are expected to take a proactive role in managing
and, where achievable, lowering flood risk, the primary responsibility for
avoiding or managing flood risk still remains with land and property owners.
The 2009 Act does not alter this. Individuals, businesses and communities
must, therefore, play a critical role in making themselves more resilient and
helping to reduce the impact of flooding. 
4.3 The 2009 Act sets out a framework designed to reduce flood risk across
Scotland over time.  Local authorities, SEPA and Scottish Water have duties
to work together to produce a national flood risk assessment, flood risk and
hazard maps, Flood Risk Management (FRM) Plans and Local FRM Plans.
This process of risk assessment, mapping and planning is required to be
repeated every six years, with the initial cycles extending over the following
dates: 
• Cycle 1: 2016 – 2022
• Cycle 2: 2022 – 2028 
4.4 SEPA published the first cycle of FRM Plans (or Strategies) in December
2015.  The Council published its first cycle of Local FRM Plans in June 2016
and subsequently published an interim report on the progress made on
implementing those plans in March 2019.  The published documents can be
viewed on the Council’s website at www.pkc.gov.uk/frmplans. 
4.5 Most recently, the progress made on the FRM process was reported to the
Environment & Infrastructure Committee on 19 May 2021 (Report No. 21/60
refers).  The selected actions to manage flood risk were approved by the
Committee and were subsequently put to public consultation from July to
October 2021. 
Update on Public Consultation 
4.6 It is essential that any action taken on flooding is informed by the best
available data.  The 2009 Act, therefore, requires that the draft FRM Plans
and the corresponding supplementary parts of Local FRM Plans be put to
public consultation.  SEPA and the lead local authorities were required to
coordinate their consultation arrangements during the production of these
documents. 
Page 6 of 354

Page 7

4.7 The previous report to the Environment & Infrastructure Committee on 19 May
2021 (Report No. 21/60 refers) set out the public consultation arrangements. 
4.8 The public consultation on the second cycle of FRM Plans was delivered
through a phased approach.  Phase 1 commenced on 21 December 2020
with further information being added during Phase 2, which progressed from
30 July to 31 October 2021. 
4.9 The consultation was a national web-based exercise carried out jointly with
SEPA and the other responsible authorities using the Citizen Space platform. 
4.10 35 responses relevant to Perth & Kinross were received by the closing date
(25 from members of the public, 1 from a local business, 2 from community
bodies, 3 from other organisations and 4 from the local authority). A summary
of the responses received, and the Council’s comments on them is provided in
Appendix A. 
4.11 As required by the 2009 Act, the responses were used by SEPA to inform the
second cycle of FRM Plans published in December 2021. They have also
informed the Council’s proposed Cycle 2 Local FRM Plans due for publication
in December 2022. 
Publication of SEPA’s Cycle 2 Flood Risk Management Plans 
4.12 Following approval by the Scottish Ministers, SEPA published the second
cycle of FRM Plans on 22 December 2021. These documents cover the 14
local plan districts across the whole of Scotland. They describe the objectives
and actions that will be implemented by SEPA and responsible authorities
over the second six-year cycle from 2022-2028. 
4.13 Perth & Kinross is located within four of these local plan districts, i.e. the Tay
district (which covers the majority of Perth & Kinross) as well as parts of the
Tay Estuary & Montrose Basin, the Forth and the Forth Estuary. 
4.14 The Council’s actions, as set out in the published FRM Plans, are consistent
with those approved by the Environment & Infrastructure Committee on 19
May 2021 (Report No. 21/60 refers). 
4.15 The published documents can be viewed on the following page of SEPA’s
website - https://www2.sepa.org.uk/frmplans/ 
Final Reports (Cycle 1: 2016 - 2022) 
4.16 Since the publication of the first cycle of FRM Plans (or Strategies) in 2015,
and Local FRM Plans in 2016, the Council and other responsible authorities
have continued to implement the actions set out therein.  As noted at 4.4, the
Council published an Interim Report on progress at the mid-point of the 6-year
cycle in March 2019. 
Page 7 of 354

Page 8

4.17 Section 38 of the 2009 Act requires lead authorities to publish a Final Report
on the Local FRM Plan around the end point of the 6-year cycle, i.e. within 5
to 6 years of publication (between June 2021 and June 2022). The Scottish
Ministers have since directed that the publication of these reports be deferred
until no later than 31 December 2022. 
4.18 The Final Report is required to set out the progress made in implementing the
measures set out in the Local FRM Plan, along with a summary of any that
were not implemented, and a description of any other measures taken. 
4.19  As the lead authority for the Tay district, Perth and Kinross Council is required
to publish this Final Report. The Council is also required to contribute to the
Final Reports for the three Local FRM Plans covering the other districts noted
at 4.13. 
4.20 The 2009 Act also requires the Final Reports be made available for public
inspection. 
Local Flood Risk Management Plans (Cycle 2: 2022 - 2028) 
4.21 The 2009 Act requires lead local authorities to publish Cycle 2 Local FRM
Plans by 22 June 2022. The Scottish Ministers have since directed that the
publication of these plans be deferred until no later than 31 December 2022. 
4.22 As the lead authority for the Tay district, Perth & Kinross Council is
responsible for publishing this plan. The Council also has an involvement in
the three Local FRM Plans for the other districts noted at 4.13. 
4.23 The 2009 Act also requires the Local FRM Plans to be consistent with, and
supplement, the published FRM Plans. The FRM Plans have characterised
the existing flood risk, set objectives for managing that risk and put forward
the selected actions to achieve those objectives. The Local FRM Plans have,
therefore, been drafted to be consistent with this information and have been
developed based on a national template. 
4.24 The Council’s actions, as set out in the proposed Local FRM Plans, are
consistent with those approved by the Environment & Infrastructure
Committee on 19 May 2021 (Report No. 21/60 refers). 
4.25 The Local FRM Plans are also required to provide more detail on the
proposed implementation arrangements for the selected actions over Cycle 2
between 2022 and 2028. Where possible, a description of how the actions will
be implemented has, therefore, been developed including the proposed
timetable, responsibilities and funding arrangements. A description of how the
functions of the responsible parties will be coordinated to achieve this has
also been included. 
4.26 The funding arrangements for flood schemes are currently under review by
the Scottish Government and CoSLA, due to the current projected costs of
Cycle 1 flood schemes across the country and the available funding.  It has,
Page 8 of 354

Page 9

therefore, not been possible to set out a programme, or to confirm the funding
arrangements, for the new Cycle 2 flood schemes. Further details are set out
in Section 2.1-2.11 of the Annex to this report. 
4.27 The responses to the public consultation undertaken between July and
October 2021 have been taken into account in producing both the published
FRM Plans and the proposed Local FRM Plans. 
4.28 In order to finalise any Local FRM Plan, the 2009 Act requires the lead
authority, every other responsible authority and SEPA to agree to its content.
The other partners in each district are, therefore, arranging formal agreement
in accordance with their respective governance arrangements. 
4.29 The process of developing the final Local FRM Plans has been delayed by
various issues including the Covid-19 pandemic, the SEPA cyber-attack, an
on-going national review of capital funding for flood risk management, staffing
shortages and flood events.  However, the four Local FRM Plans are currently
at a final draft stage and only require minor amendments prior to publication
on 21 December 2022 – see point 5.9. 
5.  PROPOSALS 
Final Reports (Cycle 1) 
5.1 Public awareness, participation and community support are essential
components of sustainable flood risk management. Public participation can
not only raise awareness of flood risk, but it can also inform decisions and
contribute to the successful implementation of actions. The publication of a
final progress report near to the end-point of the 6 year FRM cycle is,
therefore, intended to assist with this. 
5.2 The draft Final Reports have been developed in partnership with SEPA and
the relevant responsible authorities.  For the Tay district, this includes local
authorities, Scottish Water, Scottish Forestry, the Loch Lomond & the
Trossachs National Park Authority and the Cairngorms National Park
Authority. The Scottish Flood Forum have also provided information. 
5.3 The published FRM Plans and Local FRM Plans contain both general actions,
which apply across the local plan district as well as actions that are specific to
Potentially Vulnerable Areas (PVAs). The published Local FRM Plans also
provided delivery timescales for the selected actions.  The Final Reports,
therefore, set out the progress made to date on delivering those actions as
well as the measures planned to complete them. 
5.4 Each action has been allocated a red, amber or green (RAG) status to provide
an indication of its progress to date. The RAG status definitions are set out in
Chapter 3 of the Tay Final Report. 
Page 9 of 354

Page 10

5.5 The introduction of the Flood Act has initially led to improved partnership
working and data sharing between SEPA and the responsible authorities.
However, this has been affected by the Covid-19 pandemic and the cyber-
attack on SEPA. The published Tay Local FRM plan has remained current
and relevant. Since its publication in June 2016, in general good progress had
been made over the first 4 years of the first cycle, despite a relatively slow
start. Progress on the initial actions was delayed by the response required to
Storms Frank and Desmond, the staff resources required to complete
investigations into flood schemes (in Comrie, Bankfoot and Coupar Angus)
and the procurement of sufficient consultancy services initially also proved
problematic. However, with relatively few flood events between early 2016
and 2019, more steady progress was made in delivering the selected actions.
However, this changed in March 2020 with the start of the national Covid-19
lockdowns, and the severe flooding of August 2020 further exacerbated this
situation. All of the identified flood studies are complete or are currently on-
going, with only two to be commenced. The progress on the larger and more
complex flood protection schemes has been further delayed. However, a large
flood protection scheme in Almondbank was substantially completed in 2018
and the construction of a major flood scheme in Comrie has commenced. The
delivery of the actions set out in the Cycle 1 Plan has reduced flood risk and
informed future actions that will reduce flood risk in subsequent cycles. It
should be noted that the responsible authorities involved in delivering the
actions for the Tay Local Plan District () are also involved in delivering actions
in other local plan districts and their resources have been split accordingly. 
5.6 In order to finalise the Final Reports, the other partners in each district are
therefore arranging formal agreement in accordance with their respective
governance arrangements, as noted above. 
5.7 The four Final Reports are currently at a final draft stage and only require
minor amendments prior to publication – see point 5.9 
5.8 The final drafts of the Tay Final Report and the Council’s input to the other
Final Reports can be viewed in Appendices B to E: 
• Appendix B - Tay 
• Appendix C - Tay Estuary & Montrose Basin (Extract)
• Appendix D - Forth (Extract)
• Appendix E - Forth Estuary (Extract) 
Final Reports - Next Steps 
5.9 As noted at 5.7, the final reports are at a final draft stage and may still require
further minor amendments prior to final publication on 21 December 2022.
The amendments will mainly relate to the presentation of the final documents
and will include any further progress updates prior to final publication. As
such, the content (as presented in this report) will not materially change prior
to publication. 
Page 10 of 354

Page 11

5.10 Publication is currently programmed for 21 December 2022, in order to meet
the deferred deadline of 31 December 2022 directed by the Scottish Ministers. 
5.11 The Final Report for the Tay District will, therefore, be published on the
Council’s website at this time. The proposed publicity surrounding this will be
as follows: 
(i) the Council’s website will be updated to include the Final Report for the
Tay District and to provide links to the other relevant published Final
Reports.
(ii) a copy of the Final Report for the Tay District will be provided to SEPA
and the Scottish Ministers.
(iii) notices will be placed in the Scotsman, the Courier, the Stirling Observer
and the Edinburgh Gazette.
(iv) an e-mail with a link to the Final Reports will be sent to all Councillors
within Perth and Kinross.
(v) letters will be issued to each community council that falls within a PVA to
notify them of the publication of the Final Reports and how to access
them.
(vi) hard copies of the documents will also be made available in the
Council’s Perth and area offices.
(vii) announcements will be posted on social media (the Perth & Kinross
Council Facebook and Twitter pages).
(viii) information will be added to the Perth and Kinross Community Watch
website.
(ix) information will be sent to local community resilience groups within a
PVA
(x) information will be included in any other publications which are
considered appropriate. 
Local Flood Risk Management Plans (Cycle 2) 
5.12 The final draft Local FRM Plans have been developed in partnership with
SEPA and the relevant responsible authorities (for the Tay district this
includes local authorities, Scottish Water, Scottish Forestry, the Loch Lomond
& the Trossachs National Park Authority and the Cairngorms National Park
Authority). 
5.13 The published FRM Plans and final draft Local FRM Plans contain both
general actions, which are common to all areas, and actions that are specific
to PVAs that are required to tackle a particular source of potential flooding.
Existing and on-going actions to manage flood risk are also included. 
5.14 The general actions common to all areas include awareness raising, the
provision of data to support climate resilience, links with emergency planning,
flood forecasting and warning, developing guidance, flood mapping, land use
planning, maintenance (of drainage networks, and watercourse clearance and
repair works) and self-help (including individual property flood measures).
Links with communities and emergency planning already exist through the
Page 11 of 354

Page 12

Council’s internal civil contingencies steering group and involvement in the
multi-agency community resilience group. 
5.15 The specific actions include:- 
(i) Flood Protection Schemes or Works
(ii) Flood studies
(iii) Surface Water Management Plans (SWMP) 
(iv) Maintenance of Existing Flood Schemes 
(v) Community Engagement
(vi) Community Resilience Groups
(vii) Flood Warning Maintenance
(viii) Adaptation Planning
(ix) Sewer Flood Risk Assessment 
5.16 The selected actions, which are specific to the PVAs within the four local plan
districts are shown (with a green box and tick) in the table in Appendix F. 
5.17 The detailed implementation arrangements for these actions are set out within
the final drafts of the Local FRM Plans. Where possible, the timescale for the
implementation of any existing and new actions has been set out, taking
account of the on-going review of capital funding for new flood schemes, and
the available resources at the current time. The prioritisation and timetable for
flood studies has been based on the level of flood risk in each area. The
actions will be delivered by SEPA, the relevant local authorities, Scottish
Water, other responsible authorities or Transport Scotland as appropriate. The
Local FRM Plans describe how the functions of these parties will be
coordinated to implement the actions. The arrangements for funding the
actions have been based around available or potential sources of funding at
the current time. 
5.18 The final drafts of the Local FRM Plans can be viewed in Appendices G to J: 
• Appendix G - Tay
• Appendix H - Tay Estuary & Montrose Basin (Extract)
• Appendix I – Forth (Extract)
• Appendix J - Forth Estuary (Extract) 
Local FRM Plans - Next Steps 
5.19 As noted at 4.29, the Local FRM Plans are at a final draft stage and may still
require minor amendments prior to final publication on 21 December 2022.
The amendments will relate to the presentation of the final documents. As
such, the content (as presented in this report) will not change prior to
publication. 
5.20 The 2009 Act requires the Council as lead authority for the Tay district to
publish the final Tay Local FRM Plan. The final Tay Local FRM Plan will
therefore be published on the Council’s website on 21 December 2022. The
proposed publicity surrounding this will be similar to that set out at 5.11.
Page 12 of 354

Page 13

5.21 It should be noted that it will not be possible to carry out all of the selected
actions to manage flood risk within the resources available to the Council at
this time.  Although the Cycle 1 Final Reports and Cycle 2 local FRM plans
will be published on 21 December 2022, the implementation of the actions,
thereafter, will continue to be based on several factors, including priority;
availability of funding; capacity within delivery bodies and third parties to
develop the actions; coordination and agreements between partners; statutory
processes and permissions; design or other preparatory time required. 
5.22 As per Cycle 1, it is likely that in December 2025, SEPA will be assessing and
prioritising the actions to be funded in the third cycle of FRM Plans (2028-
2036). Any studies and investigations that have not arrived at an identified
solution by this time will not attract funding in the third cycle. This may result in
certain communities remaining at risk of flooding for longer. 
5.23 The 2009 Act sets out a 6-year cycle between subsequent FRM Plans and
Local FRM Plans. SEPA and the responsible authorities are required to
implement the actions set out in the current FRM Plans and Local FRM Plans.
In addition, the process of reviewing and updating the national flood risk
assessment and flood maps, as well as producing the next generation of FRM
Plans and Local FRM Plans, will also re-commence. 
5.24 Within 3 years of finalising the Local FRM Plan, the Council is also required to
publish an Interim Report on the progress made in implementing the selected
actions. A Final Report on progress must also be published no later than 6
years after the Local FRM Plan is finalised. 
6.  CONCLUSION   
6.1 This report provides an update on the publication of 
(i) SEPA’s Cycle 2 Flood Risk Management Plans in December 2021.
(ii) The Council’s Cycle 1 Final Reports on the Local Flood Risk
Management Plans published in June 2016.
(iii) The Council’s proposed Cycle 2 Local Flood Risk Management Plans for
2022-2028. 
6.2 The report seeks the Committee’s approval of the content of 
(i) The Cycle 1 Final Reports on the Local Flood Risk Management Plans
for the Tay, Forth, Forth Estuary and Tay Estuary & Montrose Basin
districts.
(ii) The Council’s proposed Cycle 2 Local Flood Risk Management Plans for
2022-2028 for the Tay, Forth, Forth Estuary and Tay Estuary & Montrose
Basin districts. 
6.3 The report also seeks the Committee’s approval to authorise the Executive
Director (Communities) with officers to carry out final minor amendments to
the presentation of the Cycle 1 Final Reports and Cycle 2 Local Flood Risk
Management Plans, prior to publication on 21 December 2022.
Page 13 of 354

Page 14

Author
Name  Designation Contact Details
Peter Dickson  Interim Flooding
Manager
01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
12 December 2022 
APPENDICES 
• Appendix A - Summary of Responses to Public Consultation
• Appendix B – Final Report (Tay) 
• Appendix C – Final Report (Tay Estuary & Montrose Basin) (Extract)
• Appendix D – Final Report (Forth) (Extract)
• Appendix E – Final Report (Forth Estuary) (Extract)
• Appendix F - Summary of Selected Actions Specific to Potentially Vulnerable
Areas
• Appendix G – Local Flood Risk Management Plan (Tay)
• Appendix H - Local Flood Risk Management Plan (Tay Estuary & Montrose
Basin) (Extract)
• Appendix I - Local Flood Risk Management Plan (Forth) (Extract)
• Appendix J - Local Flood Risk Management Plan (Forth Estuary) (Extract) 
Page 14 of 354

Page 15

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The proposals relate to the delivery of the Perth and Kinross Community
Plan/Single Outcome Agreement in terms of the following priorities: 
(ii) Developing educated, responsible and informed citizens
(iii) Promoting a prosperous, inclusive and sustainable economy
(iv) Supporting people to lead independent, healthy and active lives
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 The proposals relate to the achievement of the following Priorities in the
Council’s Corporate Plan:  
(ii) Developing educated, responsible and informed citizens; 
(iii) Promoting a prosperous, inclusive and sustainable economy; 
(iv) Supporting people to lead independent, healthy and active lives; and 
(v) Creating a safe and sustainable place for future generations. 
Page 15 of 354

Page 16

2. Resource Implications 
Financial 
2.1 It should be noted that not all of the actions identified in the second cycle of
FRM Plans and Local FRM Plans will be implemented at this time. The
implementation arrangements have been set out in the final drafts of the Local
FRM plans and are scheduled to take place over the course of Cycle 2 from
2022-2028. The final reports provide an update on the progress of any on-
going actions.  Any new potential actions will be subject to further
development through the progression of flood studies or flood scheme
proposals.  As a result, there are no immediate resource implications arising
directly from the recommendations in this report. 
2.2 The flood risk management planning process will, however, have future
financial implications. The second cycle of Local FRM Plans contain the
implementation arrangements, including the timetable for on-going and new
actions to manage flood risk, who will be responsible for implementing them,
how they will be funded (if known) and coordinated by SEPA and the
responsible authorities over the second six-year cycle. 
2.3 The 2009 Act requires the Scottish Government to have regard to the FRM
Plans and Local FRM Plans when allocating funds to SEPA and responsible
authorities. The Scottish Government, CoSLA and SEPA agreed the
distribution of capital funding to the actions identified nationally in the current
FRM Plans and Local FRM Plans. The following arrangements apply: 
(i) Only works and schemes that are prioritised in the FRM Plans and
Local FRM Plans are eligible for capital funding.
(ii) Flood protection schemes attract capital grant assistance currently of
up to 80% of their estimated project cost at tender stage from the
Scottish Government. Local authorities are required to fund the
remainder of the cost of flood schemes. The Scottish Government
allocates capital funding to local authorities engaged in flood risk
management across Scotland. 80% of this capital funding will continue
to be allocated to flood protection schemes with the remaining 20% to
other actions within the FRM Plans, as detailed in the Local FRM
Plans. This 20% is distributed to the 32 Scottish local authorities based
on the number of properties at risk of flooding and the estimated annual
average flood damages.
2.4 These arrangements are currently under review by the Scottish Government
and CoSLA, due to the current projected costs of Cycle 1 flood schemes
across the country and the available funding. 
2.5 The Council currently has four flood protection schemes that had been
included in the national priority list for the first cycle from 2016-2022. Both the
Scottish Government and the Council have made capital allocations for these
schemes. The allocated capital grant is adjusted as flood scheme proposals
are developed. 
Page 16 of 354

Page 17

2.6 At present funding is available for the Council’s proposed flood schemes in
Comrie, Milnathort and South Kinross and work on them continues. However,
as a result of the above review, the 4th priority flood scheme, on the Annaty
Burn in Scone, has been paused. While this scheme will still progress in the
future, it is likely to take longer to implement due to these funding limitations. 
2.7 The national review of capital funding is on-going and to date, no capital
funding has been allocated to any new Cycle 2 flood schemes in Scotland.
The Council has not made any allocations for its 20% contribution to the
capital cost of the new Cycle 2 flood schemes at this time. The funding
arrangements for the Council’s new flood schemes proposed in Pitlochry,
Aberfeldy and Blackford – and the flood protection works proposed for
Bridgend in Perth - therefore remain unclear for the time being. 
2.8 The conclusion of the national review into capital funding for flood risk
management is awaited. However, COSLA leaders have recently confirmed
that it is expected that the Local Government General Capital Grant will
continue to include resources allocated for flooding projects, and decisions on
quantum and distribution will be taken by Scottish Ministers and COSLA
Leaders nearer the time. 
2.9 Revenue funding will continue to be distributed in line with current
arrangements. There are no funding issues associated with the non-flood
scheme actions in the proposed Cycle 2 Local FRM Plans (flood studies,
clearance & repair works, etc). 
2.10 The Council has a legal duty to have regard to the published FRM Plans and
local FRM plans and as such, the actions set out therein are statutory
obligations. As noted above, there is some uncertainty around the funding
arrangements for some flood schemes. However, the other actions included in
the current Plans and Local Plans have been set out assuming that funding
remains at current levels. However, if funding should prove not to be available
throughout the remainder of the first 6-year cycle or the subsequent cycle of
the plans, the implementation of those actions is likely to be delayed. 
2.11 Clearly, the issue of funding support from central government will continue to
have a significant bearing on when the Council will be able to deliver its
actions to manage flood risk in the future. Where possible, the actions set out
in the Council’s current local FRM plans have been prioritised but will only be
implemented as available resources allow. 
Workforce 
2.12 There are no workforce implications arising directly from the
recommendations in this report. 
Asset Management (land, property, IT) 
2.13 The proposals in this report have no IT implications. 
Page 17 of 354

Page 18

2.14 The individual actions set out within the draft local FRM plans may have land
and property implications however these will be dealt with on an individual
project basis. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
6.2 The function, policy, procedure or strategy presented in this report was
previously considered under the Corporate Equalities Impact Assessment
process (EqIA) with the following outcome. 
3.3 Following an assessment using the Integrated Appraisal Toolkit, it was
determined that the proposal be assessed as relevant, and the following
positive outcomes expected following implementation: 
(i) Assessed as relevant and actions taken to reduce or remove the
following negative impacts: 
The effects and aftermath of flooding could have a greater impact on
mobility impaired, sight impaired, blind people or disabled people, on
children and the elderly and infirm, and on pregnant women or nursing
mothers, in relation to adverse psychological, physical and health
impacts. The selected actions to reduce flood risk described in this
report will reduce or remove these impacts. 
(ii) Assessed as relevant and the following positive outcomes expected
following implementation: 
The selected actions will have the same positive impact for all equality
groups as the reduction in flood risk to communities will provide
benefits for all (improved safety, health & wellbeing through avoidance
of flood impacts and damages) in the long-term. 
The effects and aftermath of flooding could have a greater impact on
mobility impaired, sight impaired or blind people, learning disabled
people, children, the elderly and infirm, pregnant women or nursing
mothers in relation to adverse psychological, physical and health
impacts. The selected actions to reduce flood risk described in the
report will reduce or remove these impacts. 
Page 18 of 354

Page 19

Strategic Environmental Assessment 
3.4 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.5 There are likely to be significant environmental effects associated with the Tay
local FRM plan and the other three local FRM plans that the Council will
contribute to. Consequently, an environmental assessment is necessary.
SEPA have completed an environmental assessment for their FRM Plans and
their environmental report has been published. Following a review of this
assessment, it has been confirmed that this will cover the local FRM plans
and that no further assessment is required. Screening reports submitted to the
SEA Gateway have confirmed this. 
Habitats Regulations Appraisal 
3.6 As the lead authority for the Tay district and a competent authority, the
Council also undertook a Habitats Regulations Appraisal to ensure that the
Tay Local FRM Plan will not adversely affect the integrity of Special Areas of
Conservation and Special Protection Areas. Scottish Natural Heritage was
consulted on the appraisal and their views have been taken into account.
Mitigation has been applied where required to ensure that the Tay Local FRM
Plan will not adversely affect the integrity of Special Areas of Conservation
and Special Protection Areas. 
Sustainability 
3.7 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.8 Following an assessment using the Integrated Appraisal Toolkit, it has been
determined that the proposal is likely to contribute positively to the following
corporate sustainable development principles: 
(i) Climate Change
Efficient use of resources now and in the future in the built environment
and service provision (e.g., energy efficiency, land, water resources,
flood defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3)
Page 19 of 354

Page 20

Justification:
The implementation of the actions is aimed at mitigating the effects of
increased flood risk brought about by climate change. 
(ii) Fair and Sustainable Communities
Creating a sense of place (e.g., a place with a positive ‘feeling’ for people,
and local distinctiveness) (Principle 22) 
Justification:
The proposed actions are intended to reduce the flood risk to communities
and will be subject to public consultation. 
(iii) Equality and Human Rights
Refer to Item 3.3 (above). 
3.9 Following an assessment using the Integrated Appraisal Toolkit, it has been
determined that the proposal is likely to contribute negatively to the following
corporate sustainable development principles: 
(iv) Consumption and Production
Efficient use of resources now and in the future in the built environment
and service provision (e.g., energy efficiency, land, water resources, flood
defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3) 
Justification:
The implementation of actions, e.g., new flood defences, may require a
short-term increase in energy consumption during construction, but a
future reduction due to reduced flood risk. 
Mitigation:
The efficient use of resources is to be considered on an individual
project basis. 
3.10 However, under the 2009 Act, the Council has a duty to manage flood risk in a
sustainable way and to act in the best way calculated to contribute to the
achievement of sustainable development. The measures that will be identified
in the Council’s future Local FRM Plans will comply with this requirement. 
Legal and Governance 
3.11 The Head of Legal and Governance has been consulted on this report. 
3.12 The legal basis for the proposals set out in this report is the Flood Risk
Management (Scotland) Act 2009. 
Page 20 of 354

Page 21

Risk 
3.13 The risks associated with any actions to manage flooding will be identified and
managed through individual projects. 
4. Consultation 
Internal 
4.1 The Head of Legal and Governance and the Head of Finance have been
consulted in the preparation of this report. 
External 
4.2 The key outputs from the Flood Risk Management process were subject to a
national public consultation between July and October 2021. This was a joint
web-based consultation carried out by SEPA and local authorities. The
responses to the public consultation are included in this report (refer to 4.6 -
4.11 in the main report and Appendix A) and have been used to inform the
published FRM Plans and proposed Local FRM Plans. 
4.3 The local flood risk management plans have been developed through Local
Plan District Partnerships by SEPA and the relevant responsible authorities
(local authorities, Scottish Water, Scottish Forestry, Forestry & Land Scotland,
the Loch Lomond & the Trossachs National Park Authority and the
Cairngorms National Park Authority). 
4.4 Further consultation will be carried out with relevant external stakeholders on
any individual proposals in future. 
5. Communication 
5.1 The communications arrangements for the publication of the local flood risk
management plans have been set out at 5.11 and 5.21 in the main report. 
5.2 Communication with relevant external stakeholders will take place on any
individual actions proposed to manage flood risk in the future. 
2. BACKGROUND PAPERS 
2.1 The following background papers, as defined by Section 50D of the Local
Government (Scotland) Act 1973 (and not containing confidential or exempt
information) were relied on to a material extent in the preparation of the above
report; 
• PKC – Environment Committee – 27 January 2010, Flood Risk
Management (Scotland) Act 2009 (Report No. 10/51)
• PKC – Environment Committee – 20 November 2013, Progress Report
Flood Risk Management (Scotland) Act 2009 (Report No 13/544)
Page 21 of 354

Page 22

• PKC – Environment Committee – 12 November 2014, The Flood Risk
Management (Scotland) Act 2009, Short List of Potential Measures to
Manage Flood Risk (Report No 14/483)
• PKC – Environment Committee – 21 January 2015, The Flood Risk
Management (Scotland) Act 2009, Public Consultation Arrangements
(Report No. 15/16)
• PKC – Environment Committee – 9 September 2015, The Flood Risk
Management (Scotland) Act 2009, Selected Actions and Prioritisation
(Report No 15/359)
• PKC – Environment Committee – 1 June 2016, The Flood Risk
Management (Scotland) Act 2009, Publication of Local Flood Risk
Management Plans (Report No 16/241)
• PKC – Environment and Infrastructure Committee – 23 January 2019, The
Flood Risk Management (Scotland) Act 2009 Publication of Interim Report
(Report No 19/16)
• PKC – Environment and Infrastructure Committee – 19 May 2021, The
Flood Risk Management (Scotland) Act 2009: Second Cycle of Flood Risk
Management Plans (Report No 21/60)
• PKC – Environment and Infrastructure Committee – 18 August 2021,
Flooding in Perth & Kinross of 11/12 August 2020 (Report No 21/122) 
Page 22 of 354

Page 23

Appendix A 
Summary of Responses to Public Consultation 
Tay Local Plan District 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1    Member of
the public 
Noted flooding in some
areas of Perth City and
Bridge of Earn; that
package of proposed
objectives was too vague;
wanted to hear more about
maintenance, river
dredging, use of beavers,
flooding of set aside
agricultural land, etc; work
should begin immediately. 
The Tay Local FRM Plan
includes various actions for
both Perth and Bridge of Earn,
including flood studies and a
surface water management
plan. More detail on the
objectives and actions –
including timescales - has
been provided in the final
published Plan. The Plan will
also include maintenance
actions.
2    Member of
the public 
A member of the public in
Perth is concerned that their
property has flooded
multiple times because of
heavy rain and blocked
drains. They are concerned
that this will happen again.  
The Tay Local FRM Plan
includes various actions to
manage the risk of flooding
including various flood studies,
a surface water management
plan and maintenance works.
Perth & Kinross Council’s
Roads Maintenance
Partnership carry out
maintenance of road drainage
systems. Road defects
(including blocked gullies) can
be reported to the Council via
their website.
3    Member of
the public 
A resident of Wallace
Crescent and Fairfield,
Perth expressed concern
that this area is not
mentioned, despite previous
repeated flooding of their
property. They are looking
for reassurance that this will
be considered. They
expressed concern about
development in the area,
the lack of upgrades or
improvements to the
existing drainage system
and the time required for
improvements. 
This area is located within the
Perth PVA (02/08/12) and
Objective Target Area (OTA)
253. The proposed Tay Local
FRM Plan includes specific
actions for the area that are
intended to bring about a
reduction in flood risk. These
actions include the on-going
Perth SWMP. Perth & Kinross
Council also invested in road
drainage improvements on
Wallace Crescent in 2021 to
reduce the risk of flooding.
3
Page 23 of 354

Page 24

4  Member of
the public 
A resident in Aberfeldy is
concerned about the visual
impact and access issues
associated with the
proposal to build a flood
wall as part of the Aberfeldy
Flood Scheme. 
The respondent noted
involvement in the local
community resilience plan
and in reporting blocked
street drains to the local
authority. 
The Tay Local FRM Plan
includes an action for a new
flood protection scheme in
Aberfeldy. Any issues
associated with visual impact
and access will be addressed
during the outline design of the
flood scheme via further public
consultation and the
Environmental Impact
Assessment.
In the meantime, the Council
welcomes local efforts to
improve flood resilience in
Aberfeldy.
5    Member of
the public 
A local resident who lives
next to the Craigie Burn in
Perth flooded last year and
expressed concern that
flooding has become more
frequent. They requested
quick action be taken by
pumping water away, noting
issues with surface water,
sewer flooding, issues with
flood gates, property
insurance costs, SUDS and
storage ponds. They have
taken steps to protect their
home and liaise with local
councillors. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253), including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Plan also includes self-
help and awareness raising
actions.
It is individual property owners’
responsibility to protect
themselves and their assets
from flooding.
6    Member of
the public 
A resident in Craigie, Perth
noted concern that
development has increased
flood risk and that the
objective should include
infrastructure upgrades.
They noted that some
maintenance work has
helped matters but more
requires to be done. The
resident noted that they
have previously raised
issues, but they have not
been acted on, and
suggested a community
meeting. They also note
that they monitor flooding in
the Craigie area and have
reported this to the Council.
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253), including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study, and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these
issues.
The proposed Plan also
includes other actions
including:
• Land Use Planning - all new
development is required to
comply with national and
Page 24 of 354

Page 25

local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road drainage
and existing flood defences.
The Council welcomes local
efforts to improve flood
resilience in Perth.
7  Member of
the public 
A local resident in
Blairgowrie & Rattray noted
that localised flooding in
rural Perthshire could be
mitigated in a cost-effective
way by improved ditch and
verge maintenance. The
resident noted the proposed
actions and timescales are
‘non-committal’ and won’t
be adhered to. They have
carried out their own verge
maintenance works.
The Tay Local FRM Plan
includes maintenance of
watercourses. Perth & Kinross
Council’s Flooding team
inspect and assess bodies of
water and carry out clearance
and repair works, where this
will substantially reduce flood
risk. The primary responsibility
for avoiding or managing flood
risk remains with landowners.
Actions and timescales will be
set out in the published Plan
and interim and final reports
will also be published setting
out the progress made.
The Council welcomes local
efforts to improve flood
resilience in Blairgowrie &
Rattray.
8    Member of
the public 
A local resident in Alyth
noted two floods in 6 years
and expressed concern
about waiting until 2028 for
a plan to be made. They
noted the action taken by
the local community to
protect properties but noted
that the Council should do
more. They also noted the
need for more radical action
to prevent flooding by
creating an artificial flood
plain to the north of the
town.  
The Tay Local FRM Plan
includes a number of on-going
actions to manage flood risk in
Alyth.
In particular, Perth & Kinross
Council are currently
undertaking a Natural Flood
Management (NFM) Study in
Alyth. The study will explore
the potential options for flood
risk management measures in
this area, including NFM and
flood storage. 
9    Member of
the public 
A local resident in
Blairgowrie and Rattray
noted that the timescales for
The Tay Local FRM Plan will
set out the current timescales
for actions in Blairgowrie and
Page 25 of 354

Page 26

actions are not quick
enough. 
Rattray.  This area is currently
the focus of an on-going
surface water management
plan which will consider the
potential means of managing
and, where achievable,
reducing flood risk in this area.
10  Member of
the public 
A member of the public in
Pitlochry agreed that the
main communities and
infrastructure had been
identified and with the
proposed objectives for this
area.
No response required.
11  Member of
the public 
A member of the public
noted that Dunning was not
listed in the consultation. 
Dunning was included within
PVA 08/16 in the Cycle 1 FRM
Plans, however, following the
2nd national flood risk
assessment in 2018, this area
has been re-assessed as
having a lower level of flood
risk. Dunning is therefore no
longer designated as a PVA.
However, the area is covered
by the proposed LPD-wide
actions set out in the Tay
Local FRM Plan. 
12  Member of
the public 
A member of the public in
Coupar Angus noted that: 
• flood risk is preventing
development and that
development elsewhere
has increased flood risk;
• watercourses are flowing
slower due to overgrown
vegetation and silt. 
• the A93 road should be
raised to prevent road
closures and delayed
emergency access due to
flooding.
• flood defences would
prevent flooding in
Coupar Angus but this
would move the problem
elsewhere.  
The Tay Local FRM Plan
includes actions to manage
flood risk in this area, including
the land use planning action.
All new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood
risk remains with landowners. 
The Council’s previous flood
study considered the potential
options for reducing flood risk
Page 26 of 354

Page 27

in Coupar Angus but
unfortunately did not identify
an economically viable flood
scheme. Flood risk will
therefore continue to be
managed as set out in the Tay
Local FRM Plan. 
13  Member of
the public 
A member of the public in
Perth noted:
• 8 flood events on the
Craigie Burn since 1981;
• concern about increased
flood risk due to
development and global
warming;
• the lack of scope for
improving existing flood
defences, e.g.
bottlenecks and culverts
in the Craigie Burn, and
the limited benefit of
maintenance works;
• that the pace of FRM is
too slow to keep pace
with the increased
frequency of flooding;
• that local residents need
to be kept informed of
any local works;
• the on-going risk to
property and people and
the associated costs;
and
• it is the public authorities
job to manage flood risk.   
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253) and in particular the on-
going maintenance of the
existing Perth Flood Scheme,
the on-going Craigie Burn
Flood Study and the Perth
SWMP. The Council has
already undertaken public
consultation in connection with
these issues and the
associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all
new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance
and to include SUDS to
manage surface water.
• Maintenance - of
watercourses, road
drainage and existing
flood defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce
flood risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners.
14  Member of
the public 
A member of the public in
Perth noted the increasing
frequency of flooding; the
increase in flood risk due to
development; the need to
improve drainage and not
rely on existing drainage or
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253) and, in particular, the on-
going maintenance of the
existing Perth Flood Scheme,
Page 27 of 354

Page 28

watercourses such as the
Craigie Burn; the need for
improved communication on
actions being taken; that the
scale of the flooding over
the last 20 years has been
understated; that the
timescales for action are too
slow and that interim
changes are also required.  
the on-going Craigie Burn
Flood Study and the Perth
SWMP. The Council has
already undertaken public
consultation in connection with
these issues and the
associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all
new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance
and to include SUDS to
manage surface water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences. 
15  Member of
the public 
A local resident in Perth
noted:
• that flooding wasn’t
happening ‘once every
200 years’ – there had
been 8 flood events on
the Craigie Burn since
1981; 
• concern about
increased flood risk due
to development; 
• concern about how
SUDS operate and if
they deal with older
development;
• concern about flooding
on the Craigie Burn due
to small culverts and
blockages and the
impact on flooding of
adjacent properties;
• concern that dredging
of the Craigie Burn
increases flood risk
downstream;
• disappointment that
Perth & Kinross Council
appear to be blaming
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253) and in particular the on-
going maintenance of the
existing Perth Flood Scheme,
the on-going Craigie Burn
Flood Study and the Perth
SWMP. The Council has
already undertaken public
consultation in connection with
these issues and the
associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all
new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance
and to include SUDS to
manage surface water.
• Maintenance - of
watercourses, road
Page 28 of 354

Page 29

householders for the
flooding, while allowing
development further
upstream;
• the damage done due
to surface water
flooding; and; 
• that action to manage
flood risk is too slow –
flooding is more
frequent; and
• that more
communication is
required from the
Council.
drainage and existing flood
defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce
flood risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners.  
16  Member of
the public 
A local resident on the
Cavendish Avenue area of
Perth noted concern about
increasing flooding and
health impacts due to the
limited capacity of the sewer
system outside their
property and development
elsewhere in the catchment.
This has been an issue for
15-16 years, and they feel
that the sewer requires to
be upgraded. The resident
doesn’t feel able to act as
this may increase flood risk
to adjacent properties.  
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253). In particular, there is an
on-going IFOS (Internal
Flooding due to Overloaded
Sewers) study being carried
out jointly between Scottish
Water and Perth and Kinross
Council to consider the
potential means of managing
and, where achievable,
reducing flood risk to
properties in the vicinity of
Cavendish Avenue.
Community drop-in sessions
will be held early in 2023 to
disseminate the findings of this
study. 
17  Member of
the public 
A member of the public in
the Tomcroy Terrace area
of Pitlochry noted concern
that the flood map omits to
show the flood risk to their
neighbours property, which
has been affected twice by
an adjacent small burn and
surface water run off from
fields. They noted they may
be able to help the local
community resilience group.  
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Tomcroy Terrace is affected
by flooding from the Wester
Kinnaird Burn which was fully
considered by the more
detailed modelling work
carried out under the Pitlochry
Flood Study. The study
recommended a new
watercourse diversion channel
on the Wester Kinnaird Burn at
Page 29 of 354

Page 30

Tomcroy Terrace, as part of
the wider proposals for a flood
scheme in this area. The
proposed scheme is included
as one of the actions for this
area (the Pitlochry PVA
02/08/02 and OTA 254) in the
Tay Local FRM Plan.
The Council welcomes local
efforts to improve flood
resilience in Pitlochry.
18  Member of
the public 
A member of the public
noted concern about an
increase in flood risk due to
development.
The Tay Local FRM Plan
includes actions to manage
flood risk, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
19  Member of
the public 
A member of the public in
Comrie agreed that the
main communities and
infrastructure had been
identified and agreed with
the proposed objectives for
this area.
No response required. 
20  Member of
the public 
A member of the public in
Bridge of Earn is concerned
that the Oudenarde and
Brickhall industrial sites are
not included within the
objective target area (OTA).
They noted concern about
the proposed objectives
don’t include tributaries to
the River Earn, and need to
address the flat topography
which limits surface water
drainage. They also noted
concern that the timescales
for actions were too long.   
The Tay Local FRM Plan
includes actions to manage
flood risk in Bridge of Earn
(PVA 02/08/14 and OTA 205).
The development site at
Oudenarde and the Brickhall
Industrial site both fall outwith
OTA 205, although they are
within PVA 02/08/14. The flood
risk on these sites is being
managed through the land use
planning action which applies
across the whole of the local
plan district.
The proposed objectives do
not mention any watercourses
but instead refer to the
management of flood risk.
Flood risk from any bodies of
water and their tributaries will
therefore be considered. The
Deich and Yellow Burns have
Page 30 of 354

Page 31

been noted against the
‘Maintain flood protection
scheme’ action.
The Plan also includes a Flood
study to better understand the
integrated flooding
mechanisms in Bridge of Earn
(including surface water) and
the potential works required to
reduce flood risk in the future. 
The timescales for all of these
actions have been set out in
the published Plan.
21  Member of
the public 
A member of the public
noted that all vulnerable
areas should be identified,
and this should not be
limited to affected houses,
but should also include
infrastructure. They note
that Forgandenny isn’t
included, despite previous
flooding, and that the flood
risk maps do not show
previous flooding. They
noted that support is
required from both Perth
and Kinross Council and
SEPA and noted concern
that current legislation does
not force rural landowners
to cooperate on natural
flood measures within their
land.    
The potentially vulnerable
areas (PVA’s) were set out in
the second national flood risk
assessment, published in
December 2018. This
assessment considered
homes, businesses and
infrastructure.
Forgandenny is not within one
of the areas designated as a
PVA in 2018. Even though
there has been previous
flooding, the level of flood risk
is not significant enough for
this area to be included within
a PVA.
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Notwithstanding the above,
actions have been set out in
the Tay Local FRM Plan to
manage flood risk across the
local plan district and these
apply to Forgandenny.
While current legislation does
not force rural landowners to
undertake flood measures on
their land, landowners remain
responsible for managing or
avoiding flood risk.
22  Member of
the public 
A member of the public in
Coupar Angus agreed that
the main communities and
infrastructure had been
identified and agreed with
No response required. 
Page 31 of 354

Page 32

the proposed package of
objectives.
23  Local
business 
A local business owner in
Aberfeldy noted that the
underlying causes of
flooding (the
mismanagement of the
moorlands in Highland
Perthshire) have not been
fully addressed. Work and
legislation should be
introduced immediately.
They noted that banning
grouse shooting, stopping
muir burning and moorland
ditchwork, and tree planting
would help.  
The Tay Local FRM Plan
includes actions to manage
flood risk in Aberfeldy (PVA
02/08/03 and OTA 183). This
area was fully considered by
the Aberfeldy Flood Study
which was completed in 2019.
The study considered a long
list of options (including land
management techniques) and
recommended a flood scheme
involving new flood defences
in the town. The study findings
were disseminated to the local
community via drop-in
sessions on 20 and 25 June
2019.  
24  Community
body 
Earn Community Council
agreed that the main
communities and
infrastructure had been
identified and agreed with
the proposed objectives,
actions and timescales for
the Bridge of Earn area.
The community council
noted that the local
community can help to limit
surface water runoff due to
monoblocking/ surfacing of
private land and by
implementing natural flood
management.   
Perth and Kinross Council
welcomes local efforts to
improve flood resilience in
Bridge of Earn. 
25  Other
organisation 
A group of 72 healthcare
professionals in Tayside
and North Fife issued an
open letter to Tayside and
Fife Councillors, in support
of climate mitigation for
public health. The group are
concerned that the
worsening climate crisis is a
public health emergency,
due to several factors
including worsening
extreme weather, such as
heavy rain and flooding.
Creating green and blue
The publication of the second
Tay Local FRM Plan is one of
the key actions to help us
adapt to climate change. As a
society, we need to take action
to manage the risk of flooding
and its impacts on our lives,
recognising that the risk can’t
ever be removed entirely. This
plan takes our knowledge and
understanding of flooding and
the impacts of climate change
and turns it into a set of
actions that are planned,
prioritised and co-ordinated to
Page 32 of 354

Page 33

spaces can provide health
benefits; adaptation is
required to cope with
increased rainfall, and the
risk of flooding as climate
change worsens.  
tackle flooding in the
communities where it affects
us the most. 
Flooding needs to be
managed sustainably so that
flood risk is reduced without
moving the problem
elsewhere. It must be done in
a way that contributes to the
health and wellbeing of
communities, supports the
protection and regeneration of
the environment, improves
resilience to climate change
and enables a sustainable
economy. Actions are needed
on all sources of flooding –
including from rivers, the sea,
surface water and
groundwater – to meet the
needs of present and future
generations while also
protecting and enhancing the
environment.
26  Other
organisation 
NatureScot noted that they
had previously contributed
to the 2018 NFRA
consultation and were in
general agreement with this
consultation. They provided
various detailed comments
on the proposed actions in
various OTA’s and the need
for an HRA to cover some
of these, due to on-going
and proposed actions within
Special Areas of
Conservation (SAC).
NatureScot also reiterated
that Natural Flood
Management (NFM) should
be used where possible to
reduce flood risk.  
NatureScot’s comments will
inform the various future
actions to be taken on flood
risk.
The Council has undertaken a
Habitats Regulations
Assessment as part of
development of the Tay Local
FRM Plan and has consulted
with NatureScot on this.  
NFM is considered in the
development of the Tay Local
FRM Plan and in the long list
of actions considered as part
of any individual flood studies.  
27  Elected
members 
Two of the Ward 10 elected
members) in Perth &
Kinross Council noted
concern about various
flooding issues in Perth
including:
The Tay Local FRM Plan on-
going includes actions to
manage flood risk in this area
(the Perth PVA 02/08/12 and
OTA 253); in particular, the
maintenance of the existing
Perth Flood Scheme, the
Page 33 of 354

Page 34

• Surface water flooding
from the M90 motorway
and the Broxden Park &
Ride facility;
• Operation of the flood
storage ponds at
Broxden;
• Maintenance of the
Scouring and Craigie
Burns;
• Arrangements for
developers completing
works and handing
them to the Council for
adoption;
• Flood gate closures on
the Perth Flood
Scheme;
• River and surface water
flooding at various
locations.
Craigie Burn Flood Study, the
Perth SWMP and the Perth
IFOS Project. 
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk. 
The Council also works with
developers to ensure that any
issues are fully addressed
prior to adoption. 
The primary responsibility for
avoiding or managing flood
risk remains with landowners.
A separate detailed response
was sent to the elected
members by e-mail on 25
January 2022.
28  Local
Authorities 
Perth & Kinross Council’s
flooding team made
comments specific to
various OTA’s; provided
updates for the prioritisation
of proposed Cycle 2 flood
schemes and flood
protection works; noted
concern over the lack of any
Scottish Water actions; and
suggested that Scottish
Foresty/Forestry & Land
Scotland should be
including objectives and
actions within the published
FRM Plans. No comment
was made by other services
within the Council.
N/A 
Tay Estuary & Montrose Basin Local Plan District 
No consultation responses were received. 
Page 34 of 354

Page 35

Forth Local Plan District 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1    Member of
the public 
A member of the public in
Blackford raised concern
that their property has been
designated as being at risk
of flooding from the Danny
Burn, despite it not having
flooded. They are
concerned that this is
increasing their buildings
insurance.
It is acknowledged that not all
properties within the boundary
of a PVA or OTA are at risk of
flooding. Even though a
property may not have
flooded, there may still be a
risk that flooding could occur in
the future in a higher
magnitude event. We would
need to know which property
you are referring to, in order to
comment further.
2 Local
Authority
Perth and Kinross Council’s
flooding team provided an
update for the prioritisation
of the proposed Cycle 2
Blackford Flood Protection
Scheme.
No response required.
3 Other
Organisation
NatureScot noted the
opportunities for joint
working on a priority basis.
Perth and Kinross Council will
continue to liaise with
NatureScot in relation to any
flood risk management
actions. 
Forth Estuary Local Plan District 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1    Member of
the public 
A resident in Drum queried
why the area wasn’t
included within a PVA,
despite having a large
catchment area, limited size
of culverts under the A977,
a high water table and
previous incidences of
property flooding.
They also raised concern
about the impact of
development of flood risk
The potentially vulnerable
areas (PVAs) were set out in
the second national flood risk
assessment, published in
December 2018. The village of
Drum is not within one of the
areas designated as a PVA at
that time. Even though there
has been previous flooding,
the level of flood risk is not
significant enough for this area
Page 35 of 354

Page 36

and noted that action should
be taken quickly. 
to be included within a
designated PVA.
Notwithstanding the above,
actions have been set out in
the proposed Forth Estuary
Local FRM Plan to manage
flood risk across the local plan
district and these apply to
Drum.
The proposed Forth Estuary
Local FRM Plan includes
actions to manage flood risk in
this area, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, Perth &
Kinross Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
2 Member of
the public
A resident in Milnathort
noted concern about a lack
of integrated thinking and
communication in relation to
development and planning
enforcement and flood risk.
They noted concern about
the Athron Hill development
having no water or sewage
provision, and water
draining to the back Burn
which floods Milnathort.
They noted that prevention
in the past would have been
better than reacting to
crises in the future.  
The proposed Forth Estuary
Local FRM Plan includes
actions to manage flood risk in
this area, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water. 
3 Community
Body
The Kinross Flood
Resilience Group submitted
21 questions relating to
FRM work in Kinross
including timescales,
barriers to commencement,
publication of the Local
FRM Plan, funding,
cost/benefit analysis, which
authorities are responsible,
SEPA’s on-going
involvement,
communications, notice
The responsibilities for
delivery, timescales,
coordination, and funding
arrangements for FRM actions
in Kinross will be set out in the
Forth Estuary Local FRM Plan
which is due for publication in
December 2022.
The published Plan will include
an action for the South Kinross
Flood Protection Scheme and
further details will be provided
to the local community via
Page 36 of 354

Page 37

periods, access to private
property, and the proposed
details for the South Kinross
Flood Scheme including
consultation on the flood
scheme, property
insurance, contact details
and temporary flood risk
during construction.
They agreed with the
proposed actions but noted
that expansion of the
waterways (both natural and
piped) would also benefit
the area.
The group noted that they
can respond during a flood
and could do so more
effectively with support from
PKC and the Community
Council. They are
considering use of the
‘Rivertrack’ water level
monitoring system and they
noted monitoring drains in
the area, with a view to
getting them cleared more
effectively.
public consultation in due
course.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood
risk remains with landowners.
The proposed Forth Estuary
Local FRM Plan includes a
Community resilience group
action and the Council will
continue to liaise with the
group on this. The Plan also
includes an emergency plans
action, which enables the
provision of an emergency
response during flood events.
Perth and Kinross Council
welcomes local efforts to
improve flood resilience in
Kinross.
4 Elected
member
A Ward 8 elected member
from Perth & Kinross
Council noted concern that
the village of Drum had not
been included within a PVA
despite a high water table
and previous flooding in the
area. They also noted
concern about development
and flood risk, the WWTW
capacity, and suggested a
ditch management scheme
for the area.
The potentially vulnerable
areas (PVA’s) were set out in
the second national flood risk
assessment, published in
December 2018. The village of
Drum is not within one of the
areas designated as a PVA at
that time. Even though there
has been previous flooding,
the level of flood risk is not
significant enough for this area
to be included within a
designated PVA.
The proposed Forth Estuary
Local FRM Plan includes
actions to manage flood risk in
this area, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, the Council’s
Supplementary Guidance and
Page 37 of 354

Page 38

to include SUDS to manage
surface water.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood
risk remains with landowners. 
Page 38 of 354

Page 39

Flood Risk Management
(Scotland) Act 2009: 
Final Report:
Local Flood Risk Management Plan
Tay Local Plan District 
Published by: Perth & Kinross Council
21 December 2022  
3
Page 39 of 354

Page 40

Page 40 of 354

Page 41

Foreword
This Final Report on the Tay Local Flood Risk Management Plan shows the progress
made in delivering the actions to avoid and reduce the risk of flooding and prepare and
protect us and our communities across the Local Plan District. The report also marks the
completion of Cycle 1 (2016 - 2022) as we now transition into Cycle 2 (2022 - 2028). 
“The impacts of flooding experienced by individuals, communities and businesses can be
devastating and long lasting. It is vital that we continue to reduce the risk of any such
future events and improve Scotland’s ability to manage and recover from any events which
do occur.”
(Tay Local Flood Risk Management Plan, June 2016) 
The publication of this Final Report shows that the coordinated and collaborative efforts of
public bodies can be brought together to deliver sustainable outcomes. 
This Final Report is published by Perth & Kinross Council on behalf of a partnership
comprising Angus Council, Fife Council, Stirling Council, SEPA, Scottish Water, Loch
Lomond and the Trossachs National Park Authority, Cairngorms National Park Authority
and Scottish Forestry. 
Individuals are the first line of defence against flooding and have responsibilities to protect
themselves from flooding. Through self-help and property level protection, awareness
raising and signing up to Floodline, individuals, businesses and communities can, and
have, made key contributions to the delivery of the actions in the Tay Local Flood Risk
Management Plan, which are detailed in this Final Report. 
Since the publication of the Tay Local Flood Risk Management Plan in June 2016, public
sector finances in Scotland have continued to be under considerable pressure. This places
an even greater responsibility on SEPA, local authorities, Scottish Water and other
responsible authorities to deliver their flood risk management responsibilities and, in
particular the actions in the Plan, to manage flooding in a sustainable way. During Cycle 1,
we have also had to respond to the challenges of the Covid-19 pandemic as well as
significant flood events and staffing shortages. 
SEPA, local authorities, Scottish Water and other responsible authorities will continue to
work collaboratively to implement the actions set out in the Cycle 2 Local Flood Risk
Management Plans to its conclusion in June 2028. 
Page 41 of 354

Page 42

We would like to thank all those who contributed to the development of this Report which
will help shape the way in which floods and their impacts are managed across the Tay
Local Plan District. 
Contributors 
Perth & Kinross Council
Angus Council
Fife Council
Stirling Council
SEPA
Scottish Water
Loch Lomond and the Trossachs National Park Authority
Cairngorms National Park Authority
Scottish Forestry
Forestry and Land Scotland
Transport Scotland
Scottish Flood Forum 
Page 42 of 354

Page 43

Contents 
Chapter 1 - Background ....................................................................................................... 1
Chapter 2 - Summary of the plan ......................................................................................... 2
2.1 Key Progress in Reducing the Impacts of Flooding since Publication ....................... 2
2.2 How Current is the Plan? .......................................................................................... 4
2.3 Significant Challenges ............................................................................................... 4
2.4 Summary of Actions Not Implemented ...................................................................... 8
2.5 Arrangements Planned to Deliver Remaining Actions ............................................... 9
2.6 Prioritisation of Actions for Next Plan Cycle .............................................................. 9
2.7 Next Steps ............................................................................................................... 10
2.8 Conclusions ............................................................................................................. 11
Chapter 3 - Assessment of Progress of Actions ................................................................ 12
3.1 Progress with General Actions to Manage Flood Risk Across the Tay LPD .............. 13
3.2 Progress with Specific Actions to Manage Flood Risk Within PVAs .......................... 21
3.2.1 Blair Atholl PVA 08/01 .................................................................................. 23
3.2.2 Kinloch Rannoch PVA 08/02 ........................................................................ 26
3.2.3 Aberfeldy and Pitlochry PVA 08/03 ............................................................... 28
3.2.4 Alyth PVA 08/04 ............................................................................................ 32
3.2.5 Kirriemuir & Forfar PVA 08/05 ...................................................................... 36
3.2.6 Blairgowrie PVA 08/06 .................................................................................. 39
3.2.7 Coupar Angus PVA 08/07 ............................................................................. 42
3.2.8 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam PVA 08/08 ......................... 45
3.2.9 Tyndrum and Crianlarich PVA 08/09 ............................................................ 49
3.2.10 Almondbank PVA 08/10 ................................................................................ 51
3.2.11 Scone PVA 08/11 ......................................................................................... 55
3.2.12 Perth to Kinfauns (north of A90) PVA 08/12 ................................................. 58
3.2.13 Perth Centre PVA 08/13 ............................................................................... 62
3.2.14 Comrie PVA 08/014 ...................................................................................... 68
3.2.15 Forteviot PVA 08/15 ...................................................................................... 73
3.2.16 Dunning PVA 08/16 ...................................................................................... 76
3.2.17 Bridge of Earn PVA 08/17 ............................................................................. 79
3.3 Other Actions ............................................................................................................. 83
List of Acronyms and Abbreviations ................................................................................... 85
Annex 1: FRM Responsibilities & Legal Requirement for this Interim Report .................... 86
Page 43 of 354

Page 44

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 1|1
Chapter 1 - Background 
This Final Report is a legal requirement of the Flood Risk Management (Scotland) Act
2009 (Section 38) and, following recent Ministerial Direction, is required to be published no
later than 31 December 2022. The Final Report includes: 
• An assessment of the progress made towards implementing the Tay Local Flood
Risk Management Plan published in 2016 (the ‘Plan’).
• a summary of the planned actions which were not implemented, with reasons for
their non-implementation; and
• a description of any other actions implemented since the plan was finalised which the
lead authority considers have contributed to the achievement of the objectives. 
Further details on flood risk management responsibilities in Scotland and the legal
requirement for the publication of this Final Report can be found in Annex 1. 
A copy of the published Tay Local Flood Risk Management Plan can be found at the
following link: 
www.pkc.gov.uk/frmplans 
Page 44 of 354

Page 45

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|2
Chapter 2 – Summary of the Progress of Actions in the Plan
This section sets out a summary of the progress of actions as detailed in the published
Tay Local Flood Risk Management Plan. It draws upon the assessment of progress of
actions presented in the subsequent Chapter 3. 
A summary of the planned actions which were not implemented, with reasons for their
non-implementation is provided in Section 2.4. 
A description of the other actions implemented since the Plan was finalised which have
contributed to the achievement of the objectives is provided in Sections 2.2 and 3.3. 
2.1 Key Progress in Reducing the Impacts of Flooding since Publication 
The following key progress has been made on the actions set out in the published Tay
Local Flood Risk Management Plan: -  
• Partnership Working - the introduction of the Flood Act had resulted in a more
modern and coordinated approach to flood risk management and SEPA and
responsible authorities were working more closely together than ever before.
However, the Covid-19 pandemic, remote working and the SEPA cyber-attack of
December 2020 have had an impact on the FRM planning process as well as
various on-going projects. While the vast majority of these issues have now been
resolved, the delays to Cycle 1 work will have an impact on the delivery of actions in
Cycle 2.
• Overall Progress – following a slow start, good progress was made on the identified
actions across the Tay Local Plan District (LPD). However, progress has been
significantly affected by the Covid-19 pandemic, staffing shortages and the severe
flooding experienced in many areas of the Tay LPD in August 2020 and September
2022. Out of the 182 selected actions, 156 have a green status, 22 amber and 4
actions have a red status. This is very similar to the overall status at the time of the
Interim Report in March 2019. The majority of actions have a green status, and the
majority of the remaining actions will continue into and be delivered within Cycle 2,
as set out in Chapter 3 of this report.
• Almondbank Flood Protection Scheme - substantially completed in September 2018
benefitting 31 homes and 48 businesses.
• Comrie Flood Protection Scheme – confirmed in August 2021; construction works
commenced in late August 2022.
• Perth Integrated Catchment Study - Scottish Water and Perth & Kinross Council
worked in partnership to complete a city-wide model. Further investigations have
been concluded in high priority areas.
• Flood Studies – 
Page 45 of 354

Page 46

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|3
o Studies in Pitlochry, Aberfeldy, Dunkeld, Kirriemuir and Forfar have been
completed and have identified flood risk management measures within these
towns.
o Work to develop the Perth Surface Water Management Plan is underway.
o In Perth, the Craigie Burn Flood Study is also underway.
o The Alyth Natural Flood Management Study is underway.
o Work to develop the Blairgowrie & Rattray Surface Water Management Plan
is underway.
o Work to design flood protection works at Bridgend, Perth in on-going.
o The Scone Flood Protection Study and Surface Water Management Plan will
commence early 2023.
• Flood Mapping and Modelling Improvements - a number are on-going in the Tay
Local Plan District by SEPA and other organisations. This will continue to improve
the understanding of flood risk across this area.
• Flood Forecasting - SEPA has continued to improve the Scottish Flood Forecasting
Service with the Met Office, with daily Flood Guidance Statements and regional
Flood Alerts issued as required to enable communities Category 1 and 2 agencies
(such as emergency responders, local authorities and other organisations with
flooding management duties) to reduce the impacts of flooding. SEPA, in
partnership with the Met Office, has developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast, to provide better and earlier
information to the public. Options for developing forecasts of surface water flooding
have been published in 2022 to help urban areas and the transport network
improve their resilience to and preparedness for flooding. SEPA has also continued
to provide a flood warning service to a number of locations within the Tay Local
Plan District. 
• Self Help - Perth & Kinross Council’s Housing Service has rolled out property flood
protection measures for 90 Council properties in Aberfeldy, Alyth, Comrie, Kinross
and Perth.
• Awareness Raising - Community engagement and awareness raising activities
have been carried out across the Tay Local Plan District, specifically in Potentially
Vulnerable Areas (PVA’s) where significant actions are underway or have been
undertaken (i.e., flood studies and schemes).
• Maintenance - local authorities have continued to assess watercourses and carry
out clearance and repair works where such works would substantially reduce flood
risk. They have also continued to maintain existing flood protection schemes and
defences. Scottish Water has continued to undertake risk based inspection,
maintenance and repair on the public sewer network.
• Emergency Plans/Response - Perth & Kinross Council further developed its
Flooding Emergency Response Plan to take more account of the areas at highest
risk of flooding and the severe flooding of August 2020. This included a review of
out of hours emergency arrangements and flood gate closures.
• Planning Policies - Planning authorities have continued to apply existing planning
policies and SEPA and Scottish Water have provided flood risk advice with a view
to avoiding flood risk. 
Page 46 of 354

Page 47

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|4 
2.2 How Current is the Plan? 
The Tay Local Flood Risk Management Plan was published in June 2016 to supplement
the Tay Flood Risk Management Strategy published by SEPA in December 2015. The
Plan detailed how the actions identified in the Strategy were to be implemented over the
period from 2016 to 2022. The Strategy and Plan were based on the National Flood Risk
Assessment and the designated PVAs at that time. 
Since the identification of the actions in the Plan, there have and continue to be
advancements in our knowledge and methods of assessment. These include the
publication by SEPA of an updated National Flood Risk Assessment and PVAs in
December 2018 and the subsequent introduction of Objective Target Areas. These
advancements may continue to inform the delivery of the actions in the Plan and will be
used in the development of future Strategies and Plans. 
It is therefore considered that this is the Final Report for the current Tay Local Flood Risk
Management Plan, albeit the planned delivery and actual delivery dates have changed for
some actions.  This is further detailed in Chapter 3 of this report. 
2.3 Significant Challenges 
Based on a review of the progress of actions detailed in this Final Report, the following key
challenges and issues have had an impact on the delivery of actions to manage flood risk.
Arrangements planned to deliver the remaining actions are described below. Where these
challenges have had an impact on the delivery of specific actions or actions across the
Local Plan District, this is detailed in Chapter 3. 
The overall delivery of actions in the Plan has not been impacted by funding, although
significant resource issues have been noted. 
Significant Weather Events 
The Tay LPD was adversely affected by significant weather events in late 2015 and early
2016 (Storms Desmond and Frank), which had knock on impacts on the delivery of actions
in the Plan from June 2016 onwards. For example, Perth & Kinross Council and Angus
Council resources were deployed to deal with the emergency events at that time as well as
the follow up activities and necessary works, which were still being delivered into the
2020/21 financial year. This has caused consequential delays in the planned delivery of
some actions as staff resources that would have been delivering planned actions have
been delivering emergency actions.
Page 47 of 354

Page 48

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|5 
A further significant weather event affecting the Tay LPD was the ‘Beast from the East’
which resulted in extremely low temperatures and high levels of snow fall across much of
the Plan area in March 2018.  Fortunately, there was not much significant flooding
associated with this event, as a gradual thaw limited the impacts of snowmelt. 
Significant flooding occurred during the storm of 11/12 August 2020 and a number of
smaller flood events in the months that followed. This has had a considerable impact on
the delivery of planned actions, as Councils had to divert significant resources to deal with
the aftermath of the flooding. This was the most severe flood event in Perth & Kinross in
almost 30 years and occurred during the Covid-19 pandemic (see below). The response
made up a significant proportion of Perth & Kinross Council flooding team’s workload for a
year following the initial flood event. The Scottish Flood Forum provided support to
responsible authorities and local communities who sadly flooded during this extreme
weather event. Despite covid lockdown restrictions, the Scottish Flood Forum were still
able to provide individual and group support, both face to face and online, by delivering
recovery consultations, household property flood resilience assessments, community
resilience group start-up advice and support for local authorities and key stakeholders with
online community information events. Key topics covered included insurance,
reinstatement, and future property flood resilience. 
Further significant flooding occurred in Perth and some surrounding areas on 8 September
2022. This led to further delays to the delivery of planed actions as well as the
development of this Final Report and the Cycle 2 Tay Local Flood Risk Management Plan. 
Arrangements planned to deliver the remaining actions affected by significant weather
events are described below and in Chapter 3. 
Covid-19 Pandemic 
The Covid-19 pandemic has impacted the delivery of Cycle 1 actions including a
requirement to suspend flood risk management construction works as part of the national
effort to minimise the spread of the virus during the first national lockdown.  The pandemic
also disrupted flood risk management studies, schemes and flood modelling work due to
the transition to home working and the challenges of effectively consulting and engaging
with flood affected communities.  The pandemic resulted in flooding staff being redeployed
elsewhere to assist with Covid response efforts. These impacts have resulted in higher
implementation costs and programme delays. 
Funding 
“The lists of prioritised actions to meet agreed goals and objectives in the first six-year
cycle considered what would be achievable assuming a similar level of funding for flood
risk management activities from The Scottish Government. However, given the timing of
spending reviews and annualised financial settlements for local government, the actual
ability to deliver all the actions set in the Strategies in December 2015 and detailed in this
Page 48 of 354

Page 49

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|6
Plan will be dependent on the availability of the necessary funding in each year of the six
year Plan.” 
(Tay Local Flood Risk Management Plan, June 2016). 
The level of funding from Scottish Government for flood risk activities for the first years of
the six-year Plan has generally been at the levels anticipated. 
However, the Scottish Government and CoSLA are undertaking a review of capital funding
for flood risk management.  At present funding is available for the Council’s proposed flood
scheme in Comrie and work on this continues. However, as a result of the funding review,
the proposed flood scheme, on the Annaty Burn in Scone, has been paused. While this
scheme will still progress in the future, it may take longer to implement due to these
funding limitations. The conclusion of the national review into capital funding for flood risk
management is awaited. A statement on funding is awaited from the Scottish Ministers. 
Allocation of Resources 
The availability and retention of skilled and experienced staff to deliver flood risk actions
has been a very limiting factor. Much of this human resource pressure has arisen from the
increased level of investment in flood risk management across the country, leading to
pressure on the limited pool of those with the required specialist technical skills. 
This pressure has not only been observed within the authorities responsible for
progressing individual actions, but also within the consulting engineers engaged to support
the development of solutions. 
The increased workload created by the Covid-19 pandemic and the significant weather
events noted above has put more pressure on those limited staff resources. This has
caused consequential delays in the planned delivery of actions. 
Arrangements planned to deliver the remaining actions affected by allocation of resource
issues are described below and are detailed in Chapter 3. 
Procurement and Use of Consulting Engineers and Contractors 
The availability of consulting engineers has been a limiting factor in some areas. In the
period following publication of the Plan, Perth & Kinross Council were initially unable to
engage consulting engineers and underwent repeated procurement exercises. The market
response to tender opportunities has since improved. 
The Council has also encountered some initial issues in engaging site supervision staff for
the Almondbank Flood Protection Scheme and, more recently, project management staff
for the Comrie Flood Protection Scheme. These resource issues have caused
consequential delays in the planned delivery of actions and have led to increased costs. 
Arrangements planned to deliver the remaining actions affected by the use of consulting
engineers are described below and are detailed in Chapter 3.
Page 49 of 354

Page 50

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|7 
SEPA Cyber-Attack 
On 24 December 2020, SEPA was subject to a serious and complex cyber-attack, which
significantly impacted the organisation, staff, public and private partners, and the
communities who rely on SEPA’s services. Since the attack, SEPA has worked with the
Scottish Government, Police Scotland, the National Cyber Security Centre (NCSC) and
the Scottish Business Resilience Centre (SBRC) to a clear recovery strategy. The incident
has, however, temporarily impacted progress on a number of actions such as new flood
warnings, mapping and modelling projects and some engagement activities. Many of
these projects are still going ahead but the timescales for them have been adjusted. 
Arrangements planned to deliver the remaining actions affected by the use of consultants
are described below and are detailed in Chapter 3. 
Other Actions 
Perth & Kinross Council has carried out additional actions, outwith the actions identified
within the Tay Local Flood Risk Management Plan.  These actions include: 
• Delivering on previous commitments to complete investigations into flood schemes
(at Comrie, Bankfoot and Coupar Angus) and carrying out the associated public
consultation events in late 2016.
• Riverbank erosion protection works, as well as repairs to a surface water outfall,
have been carried out on the River Almond at Inveralmond, Perth.
• Works to address surface water flooding have been carried out at Perth Harbour.
• The completion of previous flood study work for the small burns to the southeast of
Pitlochry in the vicinity of Middlehaugh of Dalshian, Easthaugh of Ballyoukan and
the Altrory Burn.
• Works to install a sheet piled cut off wall to prevent ground water seepage during
future flood events have been completed on the North Muirton Flood embankment.
• In response to the severe flooding of 11 & 12 August 2020:
o A coordinated response from various Council services and partner
organisations involving investigations, advice and support. 
o Continued work with public agencies and local resilience groups to investigate
and respond to the impact of the flooding, focusing on homes and businesses
most affected. 
o Responses to over 650 enquiries received via the Council’s dedicated web
page and generic e-mail address.
o Nine online community meetings were held.
o On the ground works in the most affected areas to respond to, and support,
emergency works.
Page 50 of 354

Page 51

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|8
o Emergency clearance works on the Craigie Burn, the Alyth Burn and the
Dunning Burn.
o CCTV camera surveys of drainage systems and culverts.
o Works to make safe a collapsed retaining wall on the Deich Burn in Bridge of
Earn.
o A report to the Council’s Environment and Infrastructure Committee on 18
August 2021, including a summary of identified short, medium, and long-term
actions. These actions were consistent with the Tay Local Flood Risk
Management Plan. 
o A review of the Council’s Out of Hours Emergency Service and flood gate
closure procedure.
• In November 2020, Scottish Water and the Council carried out the replacement of
all 8 pumps (4 foul & 4 surface water) in the South Inch Pumping Station, as part of
planned maintenance work. The remaining pumps and telemetry systems on the
Perth Flood scheme between Inveralmond and South Inch, were replaced over the
last year. 
Further details on these actions are provided within Section 3.3 of this document. 
2.4 Summary of Actions Not Implemented 
The significant challenges set out in Section 2.3 have resulted in delays to some planned
actions and as a result, some actions have not yet been implemented, or may not be
implemented at all.   
The following four actions were not implemented during Cycle 1 (2016 - 2022): 
Tyndrum & Crianlarich PVA 08/09
Action ID Delivery
Lead
Planned
Dates
Reasons Why Action Not Implemented
Strategic
Mapping
and
Modelling
(80410016) 
SEPA 2018-
2019
A detailed screening exercise has been undertaken to
identify those outstanding modelling and mapping
actions with potential multi benefits for Flooding, River
Basin Management Planning 2027 priorities and
development pressures. The outcome of this review
has indicated that this catchment is not within a 2021
Objective Target Area and doesn't provide any
multiple benefits. A decision has therefore been made
not to progress this action any further. 
Page 51 of 354

Page 52

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|9
Scone PVA 08/11
Action ID Delivery
Lead
Planned
Dates
Reasons Why Action Not Implemented
Flood
Protection
Scheme/
Works
(80230006)
Perth &
Kinross
Council
2018-
2021
The Council’s programme of flood protection schemes
has been delayed due to the reasons listed in Section
2.3 of this Final Report.
The flood protection scheme was programmed for
completion in 2024/25, but that is now subject to
capital grant funding.
Flood
Protection
Study
(80230005)
Perth &
Kinross
Council
2020-
2022
The Council’s programme of flood studies has been
delayed due to the reasons listed in Section 2.3 of this
Final Report. However, the Scone Flood Protection
Study is programmed for completion in the 2023/24
financial year.
Surface
Water
Plan/
Study
(80210018)
Perth &
Kinross
Council
2020-
2022
The Council’s programme of flood studies has been
delayed due to the reasons listed in Section 2.3 of this
Final Report. However, the Scone surface water
management plan is programmed for completion in
the 2023/24 financial year. 
As these four actions have not been completed in Cycle 1, they have been allocated a red
RAG status in Chapter 3. However, three out of the four actions listed (in the Scone PVA
08/09) will be delivered in Cycle 2. Further information on these actions can be found in
Chapter 3. 
2.5 Arrangements Planned to Deliver Remaining Actions 
The actions in the Plan will continue to be delivered over the reminder of the Cycle 2
period from 2022 to 2028. This will be as per the published Plan, subject to revisions in
delivery dates as detailed in Chapter 3 of this Final Report. 
In general, most of the remaining actions in the Plan will be delivered in Cycle 2, subject to
funding. Where specific measures are required to address a delay and ensure an action is
completed then this is described against the relevant action.  In addition, where remaining
actions have not been delivered, planned contingencies have been considered, which are
described against the relevant action. 
2.6 Prioritisation of Actions for Next Plan Cycle 
Any actions that were not put forward for inclusion in the next Tay Local Flood Risk
Management Plan by December 2019 have been deferred for consideration until Cycle 3
(2028-2034). The background to this is explained below. 
Many actions contained in the current Plan involve undertaking investigations (e.g., flood
studies) to assess the need for further action to manage flood risk. If further action is found
to be required, then it may be implemented in a future Local Flood Risk Management Plan.
Page 52 of 354

Page 53

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|10
For example, a flood protection study may recommend that a community flood action
group is set up to increase resilience to flooding, or that flood defences are constructed.
The community flood action group or flood defences may be implemented as part of the
next Local Flood Risk Management Plan covering the period between 2022-2028. 
However, for any new actions to be considered and included in the next Local Flood Risk
Management Plan (from 2022-2028), the responsible authorities had to fully detail and
submit them for consideration as actions. The deadline date for the submission of such
actions to SEPA was set as December 2019. Any actions submitted have been assessed
and prioritised against the FRM objectives and were consulted upon ahead of the
publication of the second cycle of Flood Risk Management Plans in December 2021 and
Local Flood Risk Management Plans in December 2022. Any actions that missed the
December 2019 deadline have been deferred for consideration until the third cycle of
Plans covering the period from 2028-2034. 
2.7 Next Steps 
This Final Report on the Plan will be published by 31 December 2022 and marks the
completion of Cycle 1 (2016-2022) and the commencement of Cycle 2 (2022-2028) of the
on-going flood risk management planning process. 
The Tay Flood Risk Management Plan has been updated for Cycle 2 and was published
by SEPA in December 2021 and can be accessed at: 
www2.sepa.org.uk/frmplans/documents/lpd8-tay-frmp-2021.pdf 
The Cycle 2 Tay Local Flood Risk Management Plan is scheduled to be published by 31
December 2022. 
In the meantime, to find out more about how flood risk is being managed please refer to
your local responsible authority’s website: 
Angus Council Website - Flooding  
Fife Council - Flooding  
Perth & Kinross Council - Flooding  
Stirling Council - Flooding  
Scottish Environment Protection Agency (SEPA)
Scottish Water
Scottish Forestry
Cairngorms National Park Authority
Loch Lomond & The Trossachs National Park Authority
Transport Scotland
Scottish Flood Forum 
Page 53 of 354

Page 54

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|11
2.8 Conclusions 
This report sets out as assessment of progress made towards implementing the actions
set out in the published Tay Local Flood Risk Management Plan. The report also sets
out a summary of any actions that have not been implemented, with reasons for their
non implementation, and a description of other actions implemented since the Plan was
published.  
The introduction of the Flood Act has initially led to improved partnership working and
data sharing between SEPA and the responsible authorities. However, this has been
affected by the Covid-19 pandemic and the cyber-attack on SEPA.
The published Tay Local FRM plan has remained current and relevant. Since its
publication in June 2016, in general good progress had been made over the first 4 years
of the first cycle, despite a relatively slow start. Progress on the initial actions was
delayed by the response required to Storms Frank and Desmond, the staff resources
required to complete investigations into flood schemes (in Comrie, Bankfoot and Coupar
Angus) and the procurement of sufficient consultancy services initially also proved
problematic. However, with relatively few flood events between early 2016 and 2019,
more steady progress was made in delivering the selected actions. However, this
changed in March 2020 with the start of the national Covid-19 lockdowns, and the
severe flooding of August 2020 further exacerbated this situation. 
All of the identified flood studies are complete or are currently on-going, with only two to
be commenced. The progress on the larger and more complex flood protection
schemes has been further delayed. However, a large flood protection scheme in
Almondbank was substantially completed in 2018 and the construction of a major flood
scheme in Comrie has commenced.
The delivery of the actions set out in the Cycle 1 Plan has reduced flood risk and
informed future actions that will reduce flood risk in subsequent cycles. 
It should be noted that the responsible authorities involved in delivering the actions for
the Tay LPD are also involved in delivering actions in other local plan districts and their
resources have been split accordingly.   
Page 54 of 354

Page 55

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|12
Chapter 3 - Assessment of Progress of Actions 
This section sets out an assessment of the progress made towards implementing the
actions set out in the Plan. 
There are actions that apply across the whole of the Tay Local Plan District and actions
that are specific to each of the 17 PVA’s (as defined under Section 13 of the Act) within
the Tay Local Plan District, which are shown below in Figure 1. 
Figure 1: The Tay Local Plan District with Potentially Vulnerable Areas
(Reproduced from Tay Flood Risk Management Strategy, SEPA, December 2015) 
The actions that apply across the Tay LPD are shown in Tables 1 and 2 while the actions
that apply to individual PVAs are summarised in Table 3. 
The summary of the assessment of progress is shown using the traffic light system, where
each item is marked as Red, Amber or Green (RAG) and where: 
• GREEN – Action has been completed.
• AMBER – Action has commenced but has not progressed as quickly as the planned
delivery period in the Plan.
• RED – Action has not commenced. 
Page 55 of 354

Page 56

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|13
3.1 Progress with General Actions to Manage Flood Risk Across the Tay LPD 
This section sets out an assessment of the progress made towards implementing the
actions that apply across the whole of the Tay Local Plan District over the six-year Plan.
This assessment is presented in Table 1 below. 
Table 1: Summary of Progress for General Actions to Manage Flood Risk that Apply
Across the Tay Local Plan District
Action RAG Status
Flood Forecasting G
Self Help G
Awareness Raising G
Maintenance G
Emergency Plans / Response G
Planning Policies G 
These general actions are also set out in more detail in Table 2 below which provides
further information including the RAG Status; who is responsible for the delivery and
implementation of the actions; the progress made and the work to be undertaken to
complete the action.  
Page 56 of 354

Page 57

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|14
Table 2: Progress with General Actions to Manage Flood Risk that Apply Across the Tay Local Plan District 
Action (ID) RAG
Status
Description Delivery
Lead
Progress Made Planned Actions to Complete
FLOOD
FORECASTING
(80410009)
G The Scottish Flood Forecasting Service is a joint
initiative between SEPA and the Met Office that
produces daily, national flood guidance statements
which are issued to Category 1 and 2 Responders.
The flood guidance statements provide an
assessment of the risk of flooding for a five day
period allowing responders time to put preparations
in place to reduce the impact of flooding.  The
service also provides information which allows
SEPA to issue flood warnings, giving people a
better chance of reducing the impact of flooding on
their home or business. For more information,
please visit SEPA’s website.
SEPA SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood Alerts
issued as required to enable communities and
responders to reduce the impacts of flooding. SEPA in
partnership with the Met Office has developed a public
version of the daily Flood Guidance Statement, the
Scottish Flood Forecast, to provide better and earlier
information to the public. A beta version of this product
was launched in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their resilience
to and preparedness for flooding.
The Scottish Flood Forecast will be refined in the
wake of user feedback. A more focussed version
of the product, producing guidance at a local
level, is planned for the next flood risk
management cycle. 
The development and wider roll-out of surface
water flooding forecasts is being considered
alongside the technical, resource and
communication challenges associated with
providing surface water flooding guidance.
SELF HELP
(80410011)
G Everyone is responsible for protecting themselves
and their property from flooding. Self-help actions
can be undertaken by any individuals, businesses,
organisations or communities at risk of flooding.
They are applicable to all sources, frequency and
scales of flooding. They focus on awareness
raising and understanding of flood risk. 
Property and business owners can take simple
steps to reduce damage and disruption to their
homes and businesses should flooding
happen. This includes preparing a flood plan and
flood kit, installing property level protection, signing
up to Floodline and Resilient Communities
Initiative, and ensuring that properties and
businesses are insured against flood damage.
- Local authorities have engaged and supported their
local communities to become more resilient to
emergency situations, including flood events. Advice
has been given on how to prepare for flooding, install
property level protection and the Resilient Communities
Initiative. 
In Perth & Kinross, communities have been engaged
through the multi-agency Local Resilience Partnership
Community and Business Resilience Group, led by the
Council. The Council’s Housing Service has taken
action to protect 90 Council properties within Aberfeldy,
Alyth, Kinross, Comrie and Perth. Further details are
provided within the relevant areas of Section 3.2 of this
report. The Council also provided a considerable
amount of advice and assistance following the severe
flood events of 11/12 August 2020 and 8 September
2022.
Angus Council’s Roads supervisors have been advised
of the corporate message on flooding and the Council’s
Flood Team seek feedback from them following flood
incidents to assess the impact of Council’s message
and actions.
Stirling Council’s Resilience team are able to work with
communities to develop community resilience plans. If a
resilience group exists, Stirling Council have committed
to providing a flood pod as part of flood risk
management, where materials can be stored and
distributed. Stirling Council’s flood team, in conjunction
with the resilience team, host annual online information
sessions on resilience groups.
The Scottish Flood Forum provided support and advice
to 5 communities (Bankfoot, Aberfeldy, Alyth,
Blairgowrie and Comrie) to help people protect
themselves and their property. This includes advice to
Local authorities will continue to support
communities to become more resilient to flooding
and to develop community resilience groups and
emergency plans.
Perth and Kinross Council’s Housing Service will
undertake a review of properties and areas that
have experienced recent flooding to consider the
installation of further property flood protection
products. This will be supported by
communications via the Council’s social media
platforms to raise awareness and let tenants
know where they can find information. The
Housing Service will support and encourage
tenants to be prepared in advance of flooding. 
Page 57 of 354

Page 58

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|15
residents on PLP assessments and advice on
insurance and developing community resilience to
prepare for flooding. The Forum continues to:
• Promote FloodRE affordable insurance and the Build
Back Better insurance initiative. 
• Support the Property Flood Resilience (PFR) Delivery
Group that aims to mainstream PFR and help
property owners take action to make their properties
more resilient against the impacts of flooding.
• Offer independent impartial advice on the Property
Flood Resilience and promote the CIRA standards
and code of practice on PFR. This includes the
Forum’s PFR assessments to individuals,
communities and agencies who request support.  
AWARENESS
RAISING
(80410013)
G Public awareness, participation and community
support are essential components of sustainable
flood risk management. SEPA and the responsible
authorities have a duty to raise public awareness of
flood risk. This is undertaken both individually and
collaboratively by a range of organisations. 
Improved awareness of flood risk and actions that
prepare individuals, homes and businesses for
flooding can reduce the overall impact. From 2016
SEPA will undertake flood risk education and
awareness raising activities. In addition, SEPA will
engage with community resilience groups and
participate in property level protection events
delivered by the Scottish Flood Forum where
possible. 
Across Scotland, SEPA will create and share
communication and education resources with other
responsible authorities. These resources will
include awareness campaigns, media and
marketing activity and promotion of SEPA's flood
forecasting and warning services (Floodline).
Where they exist, SEPA will engage with
community resilience groups and community safety
partnerships. 
Local authorities will be undertaking additional
awareness raising activities when developing any
specific project proposals and will engage with
community resilience groups and local
communities.  As a responsible authority, Scottish
Water will support SEPA and responsible
authorities with awareness raising activities as
required and provide targeted flooding
communications for Scottish Water specific
activities. Scottish Water will raise awareness by
producing and supplying targeted information to
the public on large capital projects and detailed
local studies. More general information and
flooding guidance will be available on the website
Responsible
authorities
SEPA continued to raise awareness of flood risk
through campaigning, developing education and
engagement tools, creating new partnerships, and
improving the flood warning and forecasting service.
Many of SEPA's awareness raising activities will
continue. The focus will be on promoting the flood
warning and forecasting service, innovation, education
and engagement with partners, customers and the
public.
Local Authorities have undertaken awareness raising
activities around specific project proposals and have
engaged with community resilience groups and local
communities. Local authorities have also developed
their websites and social media to provide more advice
and information on flood risk management. Those local
authorities affected by the flooding of August 2020 and
September 2022 also provided a considerable amount
of advice to raise awareness of flood risk in affected
communities.
Stirling Council use SEPA’s flood alerts to deliver
targeted flood awareness information. The Council are
developing an annual programme of attending local
events to deliver awareness raising objectives. The
Council also works with the Scottish Fire and Rescue
Service to deliver joint flooding messages at annual fire
station open days.
Scottish Water support SEPA and responsible
authorities with their awareness raising activities as
required and provide targeted communications for
Scottish Water sewer flooding programme activities. 
Scottish Water raise awareness by producing and
supplying targeted information to the public on large
capital projects and detailed local studies.
Scottish Forestry (SF) continues to engage with
responsible authorities to make sure that the
contribution of woodlands and forestry is recognised
when natural flood management measures are
promoted. Interactions with the public are sought at
Local Authorities will continue with awareness
raising activities when developing proposals for
the remaining actions in the Tay Local Flood Risk
Management Plan.
Stirling Council will continue its efforts to increase
the number of active local flood groups in the
Stirling Council area, as well as ensuring existing
groups are adequately supported to remain
viable and active.
Scottish Water are continuing to support SEPA
and Local Authorities in their awareness raising
activities. General awareness raising is carried
out through the Scottish Water website and
national advertising campaigns to increase public
awareness of the implications of their actions on
sewer flooding. For site specific capital projects
and local studies, targeted public engagement is
being carried out at a local level.
Scottish Forestry will continue to:
i) improve their regional knowledge on flood
risk and the PVAs. 
ii) identify opportunities for forestry projects
across the country.
iii) engage with local communities through the
revision of Land Management Plans. 
Page 58 of 354

Page 59

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|16
at https://www.scottishwater.co.uk/you-and-your-
home/your-home/flooding-information.
public National events (for example the Royal Highland
Show) and regional/local events (for example the Turiff
Show) to highlight the role that trees, and woodland
have in contributing to managing flood risk. This
includes working with facilitators (from the charitable
sectors and businesses) to help partnership initiatives
that aim to improve public resilience to flood risk and to
make sure that the communities have access to
information and help/support. SF continue to work on
partnership initiatives to spatially identify where
woodland can be planted and managed - these include
the local communities. Forest Enterprise Scotland (the
agency of Forestry and Land Scotland Scotland)
engages with communities, NGOs and statutory
stakeholders on the revision of Land Management
Plans. Flooding is part of these catchment-focused
discussions where SF’s planners raise awareness of
the benefits that trees and forestry can bring to flooding
and the associated reduction of peak flows through: -
1) Evaporation of rainfall from canopy and. 
2) Transpiration of heavy rain into the forest soils and
geology.
Following the August 2020 flooding, the Scottish Flood
Forum has raised awareness within four affected
communities (Perth, Dunning, Kinross and Alyth) by
answering 86 individual queries and arranging 5 mobile
surgeries. The Forum continues to support awareness
raising activities to increase understanding of flood risk
and flood risk management actions with communities
and agencies. The Forum continues to engage flood
risk communities and partners through their community
newsletter and peer to peer networking events to build
links and share experience on key flood risk
management issues.   
MAINTENANCE 
(80410007)
G Local authorities have a duty to assess
watercourses and carry out clearance and repair
works where such works would substantially
reduce flood risk. They produce schedules of
clearance and repair works and make these
available for public inspection. Scottish Water will
undertake risk based inspection, maintenance and
repair on the public sewer network. Asset owners
and riparian landowners are responsible for the
maintenance and management of their own assets
including those which help to reduce flood risk.
Section 18 and 59 of the Flood Risk Management
(Scotland) Act 2009 place duties of watercourse
assessment, clearance and repair on local
authorities. In addition, local authorities may also
be responsible for maintenance of existing flood
protection schemes or defences.
Local
Authority,
asset / land
managers 
Local authorities have continued to inspect and assess
watercourses and carry out clearance and repair works
where such works would substantially reduce flood risk.
This has included producing schedules of clearance
and repair works and making these available for public
inspection.
In Perth & Kinross, the Council’s routine watercourse
inspections are a carried out either annually, six
monthly or quarterly, depending on the flood risk
associated with each watercourse.  Further reactive
inspections have been carried out when issues have
been highlighted or during times of flooding. Where a
flood risk is identified, and clearance and repair works
would substantially reduce that flood risk, then those
works are included on the Council's clearance and
repair schedule and carried out. 
Significant examples of clearance and repair works are
noted within various PVAs in this report. Culvert
Local authorities will continue to inspect and
assess watercourses and carry out clearance and
repair works where this would substantially
reduce flood risk. Reactive maintenance will also
continue to be undertaken where issues are
identified.
Perth & Kinross Council will also continue to
maintain the formal flood schemes within its area,
as per the existing inspection and maintenance
regime. Road gullies will continue to be monitored
and cleared as per the gulley monitoring
programme.
Stirling Council will continue to inspect
watercourses to identify flood risks and to carry
out the regular inspection and clearance regime
of identified sensitive assets which has resulted in
a reduction in localised and repeat flooding
incidents. Budgets have however been reduced
Page 59 of 354

Page 60

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|17
replacement works were also carried out at Westhaugh
of Dalshian, Pitlochry in 2016. A significant amount of
emergency clearance works (on the Craigie Burn, Alyth
Burn and the Dunning Burn) were carried out following
the August 2020 flood. Emergency works were also
carried out to make safe a collapsed retaining wall on
the Deich Burn in Bridge of Earn. 
The Council has also continued to inspect and maintain
existing flood protection schemes.
Perth & Kinross Council also operates a monitoring
programme for the inspection and maintenance of road
gullies. Each gulley is inspected, and cleared if
required, once per year. The monitoring programme
identifies gullies that are more at risk from blockage so
that they can be checked more frequently. It also
enables the Council to reduce the frequency of
inspections where gullies are found to require less
frequent maintenance. Through this monitoring, the
Council is developing a more strategic and sustainable
approach to gully maintenance.  The public can also
contact the Council to highlight issues with any road
gullies.  
In Angus, the Council’s maintenance contract is let and
managed on yearly basis. Reactive maintenance is also
undertaken where issues are identified.
Stirling Council has a successful watercourse
inspection regime in place which identifies risks. Where
the problems reside in private property the Council
notifies landowners of their riparian responsibilities. A
letter will be sent to landowners to inform them of the
need to undertake works, as well as the grading and
risk of identified obstructions within the watercourse. If
the flood risk will affect any roads, an enforcement letter
can be issued under the Roads (Scotland) Act 1984.
The Council also has a maintenance regime in place
where key hot spot locations of assets such as
grilles/inlets have been identified and are inspected at a
regular frequency. This work is carried out by
contractors and managed by the Council’s flooding
team. Any additional works identified are added to a
schedule of works and prioritised based on risk and the
available budget.
Scottish Water have carried out risk-based inspection,
maintenance and repair on the public sewer network.
therefore the volume of clearance and repair
works have reduced. Maintenance will continue to
be carried out on a risk-based approach and
cyclic maintenance scheduled on assets at time
intervals based on risk posed/known sites of
interest or known issues. There is an annual
consideration and refinement in maintenance
schedules. The Council will continue to seek
methods of continuing a sustainable level of
maintenance activities through resilience groups
and a risk-based approach to asset management. 
Scottish Water will continue to carry out risk-
based inspection, maintenance and repair on the
public sewer network 
EMERGENCY
PLANS /
RESPONSE
(80410014)
G Providing an emergency response to flooding is the
responsibility of many organisations, including local
authorities, the emergency services and SEPA.
Effective management of an emergency response
relies on emergency plans that are prepared under
the Civil Contingencies Act 2004 by Category 1
and 2 Responders. The emergency response by
these organisations is coordinated through regional
Category 1
and 2
Responders
Local authorities have developed emergency plans.
Perth & Kinross Council further developed its Flooding
Emergency Response Plan to take more account of the
areas at highest risk of flooding and the severe flooding
of August 2020. The Plan is designed to ensure that
contingency measures are in place for a coordinated
and flexible response to flooding incidents to mitigate
the effects of flooding emergencies on people, property
Local authorities will continue to review, develop
and implement their emergency plans.
Where no incidents have occurred in Perth &
Kinross within a 12-month period a tabletop
exercise will be conducted to test the response
plan. This exercise may include consideration of
flooding incidents, severe weather, widespread
flooding, storm events, etc.
Page 60 of 354

Page 61

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|18
and local resilience partnerships. This response
may be supported by the work of voluntary
organisations. Emergency response plans are
applicable for all types of flooding. They set out the
steps to be taken during flooding in order to
maximise safety and minimise impacts where
possible. Under the Civil Contingencies Act,
Category 1 Responders have a duty to maintain
emergency plans. Emergency plans may also be
prepared by individuals, businesses, organisations
or communities. 
Scottish Water is a Category 2 responder under
the Civil Contingencies Act 2004 and will support
regional and local resilience partnerships as
required.
and infrastructure. During recent flood events, the
Council’s Housing service has worked with Tayside
Contracts to provide sandbags to tenants and residents
within housing localities and provided wellbeing checks
and support for tenants who have been at risk or
affected by flooding. The Council’s Housing Repairs
Centre set up flooding FAQ’s and is able to advise and
support tenants calling at the time of flood events.         
Angus Council has developed emergency plans that
take account of new information received and the plans
are constantly under review.  Angus Council continue to
support resilience partnerships whenever requested to
do so.
Over and above civil contingencies planning, in June
2017 Stirling Council established a formal Flood
Partnership Group between the Scottish Fire & Rescue
Service, the Scottish Flood Forum, SEPA, Emergency
Planning Officers and the flooding teams from each
Local Authority and Scottish Water. There is potential to
expand the working group to include other agencies or
the voluntary sector. The group continued to operate
until March 2021 but ceased during the covid
pandemic.
Fife Council’s updated Flood Emergency Plan was
published in November 2016 and will be updated again
in 2023-24.  
As a Category 2 Responder, Scottish Water has
continued to support regional and local resilience
partnerships as required.
The SFF continue to offer bespoke flood recovery
services to agencies and communities impacted by
flooding.
Angus Council will continue to review emergency
plans to ensure that they are relevant and fit for
purpose. They will also continue to provide
support to resilience partnerships.
Stirling Council will re-engage with a partnership
working model and embed communications links
between key group stakeholders and also to
expand group membership to other potential
partners (e.g., volunteer sector, TCV, etc)
Fife Council’s Flood Emergency Plan is due to be
updated in the 2023/34 financial year.
As a Category 2 Responder, Scottish Water will
continue to support regional and local resilience
partnerships as required. 
PLANNING
POLICIES
(80010001) 
G The Scottish Planning Policy (SPP) and
accompanying Planning Advice Notes set out
Scottish Ministers’ priorities for the operation of the
planning system and for the development and use
of land. In terms of flood risk management, the
SPP supports a catchment scale approach to
sustainable flood risk management and aims to
build the resilience of our cities and towns;
encourage sustainable land management in our
rural areas; and to address the long term
vulnerability of parts of our coasts and islands.
Under this approach, new development in areas
with medium to high likelihood of flooding should
generally be avoided. 
SEPA has a statutory role in relation to the
provision of flood risk advice to planning
authorities. This role is expressed in Section 72 of
the Flood Risk Management (Scotland) Act 2009.
SEPA also has a duty to co-operate with planning
authorities in the preparation of development plans.
Planning
authority
SEPA continues to exercise its planning functions with
a view to reducing overall flood risk. We effectively
contribute to the delivery of sustainable flood risk
management, and we support the delivery of FRM
Plans and Local FRM Plans. In line with the
management actions that accord with national planning
policies, we have and will continue to object to
development at medium to high risk of flooding when it
is contrary to the risk framework set out in Scottish
Planning Policy. We have and will continue to engage
from the start of the development plan process and
encourage planning authorities to undertake a Strategic
Flood Risk Assessment to inform their spatial strategy.
We remain committed to exercising our planning
functions with a view to reducing overall flood risk, and
when a new national planning policy context is finalised
later in 2022 via the National Planning Framework 4,
we will take the same approach. 
The current Perth & Kinross Local Development Plan
(LDP2) contains planning policy and development
For Perth & Kinross Council, key milestones in
the LDP3 review will be the policy and place
discussions which will take place during 2023/24,
culminating in the preparation of an Evidence
Report in 2024, whilst preparation of the
Proposed Plan is programmed for 2024/25. To
inform this process, the Council is undertaking a
Strategic Environmental Assessment (SEA) and
will prepare an Environmental Report to identify,
describe and evaluate the likely significant effects
on the environment. The SEA includes the
consideration of flood risk in site assessment and
policy work and will involve engagement with
SEPA and the Council’s flooding team.
Angus Council’s Flood Team will continue to
provide the current level of support to Planning
colleagues.
Stirling Council will continue to work closely with
both planning authorities in the development and
implementation of local development plans, to
Page 61 of 354

Page 62

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|19
When consulted in relation to planning applications
for development or site allocations in development
plans, and where the planning authority considers
there may be a risk of flooding, SEPA will provide
advice. The advice provided by SEPA will be with
respect to the risk of flooding and on the basis of
the relevant information it holds which is suitable
for planning purposes. It will also be in line with the
principles and duties set out in the FRM Act.
Further information about how SEPA engage in the
planning system, including guidance on flood risk
and planning is available on SEPA website
http://www.sepa.org.uk/environment/land/planning/.
Current national planning policies, the Scottish
Planning Policy and accompanying Planning
Advice notes restrict development within the
floodplain and limit exposure of new receptors to
flood risk. Planning authorities are responsible for
implementing this policy guidance when preparing
Local Development Plans and when considering
individual planning applications. In addition to
national policies, local planning policies may place
further requirements within their area of operation
to restrict inappropriate development and prevent
unacceptable risk. Scottish Water is a statutory
consultee within the planning legislation. They
provide advice to planning authorities during the
preparation of Local Development Plans and are
required to comment on all outline or full planning
applications which are referred by a planning
authority.   
allocations which ensure that new development at
medium to high risk of flooding is avoided (unless flood
protection measures to the appropriate standard (1:200
years) already exist and are maintained, are under
construction, or are a planned measure in a current
flood risk management plan). SEPA and Perth &
Kinross Council’s flooding team input to the planning
application process as necessary to implement flood
risk policy and ensure there is an appropriate
assessment and mitigation of flood risk as detailed
development proposals come forward. The Council's
flooding team has reviewed approximately 1,300
planning applications since the start of the 2019/20
financial year as a consultee in the planning process.
The Council's flooding team has also provided
additional advice on flood risk management to the
Planning Authority outwith these formal consultations.
Perth & Kinross Council has started a review of LDP2
(which was adopted in November 2019) to produce
LDP3. The initial work on the LDP3 review has been
centred on data gathering and settlement audit work.
However, the work carried out since the adoption of
LDP2 has largely been focussed on preparing,
consulting on, revising and adopting the Flood Risk and
Flood Risk Assessment Supplementary Guidance,
which was adopted in March 2021, and responding to
Scottish Government consultations on the draft National
Planning Framework 4 (NPF4), and Local Development
Planning regulations. The main updates to the Flood
Risk and Flood Risk Assessment Supplementary
Guidance related to climate change; and the
requirements for sustainable urban drainage systems
(SuDS) and the ongoing maintenance responsibilities,
including information on potential maintenance
agreements with Scottish Water under Section 7 of the
Sewerage (Scotland) Act.
Angus Council’s Flood Team provide responses to all
Planning Applications where there is potential for flood
risk or surface water management systems to ensure
that Scottish Planning Policy and suitable design
criteria are met.
Within Stirling Council, flood risk information, including
the local flood risk management plan, feed into the local
development plan. Planning authorities are kept
informed of new developments internally through
flooding teams and through attendance of local
advisory group meetings.
Loch Lomond & Trossachs National Park have a
number of flooding policies in their local development
plan which are used by development management
during the assessment of planning applications.  Their
usage is being monitored as part of the monitoring of
incorporate the latest flood risk management
objectives into the process from the outset. Once
approved, any policies from the Fourth National
Planning Framework (NPF4) will be incorporated
also. The next planned publication date for LDP is
currently estimated to be mid-2025 at the earliest. 
Page 62 of 354

Page 63

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|20
the Local Development Plan.
Fife Council’s Planning Policy has been amended in the
Strategic Plan to ensure that flooding is considered at
the outset in line with current SPP. A Planning Policy is
in place to ensure a flood risk assessment, SuDs
details and any other relevant information is provided
with the submission of a Planning Application;
otherwise, the application is returned as incomplete.
Fife’s Flooding Team are providing direct input to the
creation of LDP2, focussing on the avoidance principle
first, before allocation of land is undertaken.  
Page 63 of 354

Page 64

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|21
3.2 Progress with Specific Actions to Manage Flood Risk Within PVAs 
This section sets out an assessment of the progress towards implementing actions that
are specific to each of the 17 PVAs shown in Table 3. Assessments of the progress of
actions within each PVA are presented. 
Table 3: Summary of Progress of Specific Actions to Manage Flood Risk Within
PVA’s During 2016-2022
PVA Location
Flood protection scheme/ works
Flood protection study
Maintain flood protection scheme*
Natural flood management study  
Natural flood management works
Strategic mapping and modelling
New
flood warning
Maintain flood warning*
Flood forecasting
Community flood action groups
Awareness raising
Self help
Property level protection scheme
Surface water plan/study
Maintenance
Site protection plans
Emergency plans/ response
Planning policies
08/01 Blair Atholl   N/A   G  N/A G G G G   G  G G
08/02 Kinloch Rannoch   N/A     N/A G  G G   G  G G
08/03 Aberfeldy & Pitlochry  G G   A G  G G G G G   G  G G
08/04 Alyth   N/A A  A G  N/A G  G G   G  G G
08/05 Kirriemuir & Forfar  G G   A G  N/A G  G G  G G  G G
08/06 Blairgowrie   N/A   G  G G  G G  A G  G G
08/07 Coupar Angus   N/A   G  N/A G  G G   G  G G
08/08
Luncarty, Stanley,
Bankfoot, Dunkeld &
Birnam 
A N/A   A G  G G  G G   G  G G
08/09 Tyndrum & Crianlarich   N/A   R  N/A G  G G   G  G G
08/10 Almondbank G  G   A G  G G  G G   G  G G
08/11 Scone R R N/A   G  N/A G  G G  R G  G G
08/12 Perth to Kinfauns
(north of A90) A  G   G  G G  G G  A G G  G G
08/13 Perth Centre  A G   A G  G G G G G  A G G  G G
08/14 Comrie A  G   A G  G G G G G   G  G G
08/15 Forteviot   N/A   A A  G G  G G   G  G G
08/16 Dunning   N/A   A G  G G  G G   G  G G
08/17 Bridge of Earn   G   A G  G G G G G   G  G G 
* Note: N/A is used where there is no formal Flood Protection Scheme or flood warning scheme
present. 
There are no specific actions identified for ‘property level protection scheme’ and ‘site
protection plans’ actions. Consideration of property level protection schemes will be
included in the ‘flood protection study’, ‘surface water plan/study’ and/or ‘emergency
Page 64 of 354

Page 65

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|22
plans/response’ actions. Site protection plans will be identified through these same ‘study’
actions and also ‘planning policies’ action.  
Page 65 of 354

Page 66

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/01 Blair Atholl|23
3.2.1 Blair Atholl PVA 08/01 
Local Plan District Local Authority Main Catchment
Tay Perth & Kinross Council River Garry (River Tay) 
Summary of Progress Within PVA 
There are fewer than 10 residential properties and non-residential properties at risk of flooding in the
Blair Atholl PVA. The Annual Average Damages are approximately £14,000. Further information can
be found in the Tay Local FRM Plan under PVA 08/01.
This PVA has been exposed to recent significant weather events including Storms Desmond and
Frank in December 2015 and January 2016, which resulted in flooding in the Tay and Garry
catchments. There have been no significant flooding events since. 
Key progress has been made through engagement with the community council which has
established a community resilience group, developed a resilience plan and installed a RiverTrack
Community Flood Alerting System. 
SEPA have also made progress on strategic mapping and modelling in order to improve the existing
flood maps for the area.
Whilst there is no specific action within this PVA for a flood protection study, the Blair Atholl Estate
commissioned a consultant to investigate the potential for any flood works to reduce risk to
properties on its land at Garryside, however no cost-effective options were identified.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Blair Atholl PVA 08/01 
PVA 
Flood
protection
scheme/works
Flood
protection
study 
Maintain flood
protection
scheme
Natural flood
management
study
Natural flood
management
works
Strategic
mapping and
modelling
New
flood
warning
Maintain flood
warning
Flood
forecasting
Community
flood action
groups
Awareness
raising
Self help
Property level
protection
scheme
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/01      G   G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Blair Atholl (PVA 08/01)
Action (ID)  Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping
and
Modelling
(80410016)
G
SEPA will seek to develop flood mapping in the
River Garry area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016-
2017
This action is complete.  Updated river flood hazard
mapping was published on the SEPA web site in
2020.
This action is complete.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
Page 66 of 354

Page 67

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/01 Blair Atholl |24
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding. 
considered alongside the technical,
resource and communication challenges
associated with providing surface water
flooding guidance.
Community
Flood Action
Groups
(80020012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Blair Atholl Community Council operates in this
area. The community council is currently in the
process of developing a community resilience
plan which includes plans to mitigate the impact
of flooding.
Community Ongoing Blair Atholl and Struan Community Resilience
Group is established in this area and their resilience
plan has been tested. This group forms part of the
A9 Resilience Plan.
The Scottish Flood Forum, with support from SSEN,
Perth & Kinross Council and SEPA, supported the
Community Resilience Group and Blair Atholl
Estates to install a RiverTrack Community Flood
Alerting System.
Perth & Kinross Council will continue to
coordinate with Blair Atholl and Struan
Community Council on a priority needs
basis where resources allow. 
The Scottish Flood Forum will carry out
further engagement as required. 
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
Authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Blair Atholl PVA. Perth &
Kinross Council held a de-briefing with the Blair
Atholl Community Resilience Group following the
flooding experienced in December 2015. The local
landowner (Blair Atholl Estate) has explored
potential ways of managing flood risk to their
properties. They undertook a high level flood
options study and were advised by Perth & Kinross
Council during this process.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the planned awareness raising
activities described in Table 2 of this report,
the responsible authorities will continue with
awareness raising activities when
developing any proposals for the remaining
actions set out in the Tay Local Flood Risk
Management Plan.
Self Help
(80410011) G
Refer to Description in Table 2. - Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007) 
G
Refer to Description in Table 2. Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans / 
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Page 67 of 354

Page 68

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/01 Blair Atholl |25
Planning
Policies
(80010001)
G
Refer to Description in Table 2  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 68 of 354

Page 69

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/02 Kinloch Rannoch|26
3.2.2 Kinloch Rannoch PVA 08/02 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Loch Rannoch (River Tay) 
Summary of Progress Within PVA 
There are approximately 30 residential properties and 20 non-residential properties at risk of
flooding in the Kinloch Rannoch PVA. The Annual Average Damages are approximately £94,000.
Further information can be found in the Tay Local FRM Plan under PVA 08/02.
There have been no significant weather events in this PVA since the publication of the Tay Local
FRM Plan. 
The Scottish Flood Forum has been involved in supporting the community to become more
resilient to the effects of flooding. The responsible authorities will continue with awareness raising
activities when developing any proposals for the remaining actions set out in the Tay Local FRM
Plan.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Kinloch Rannoch PVA 08/02
PVA 
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling
New
flood
warning
Maintain flood
warning
Flood
forecasting
Community
flood action
groups
Awareness
raising
Self help
Property level
protection
scheme
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/02         G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in the Kinloch Rannoch PVA
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities and
responders to reduce the impacts of flooding. SEPA
in partnership with the Met Office has developed a
public version of the daily Flood Guidance
Statement, the Scottish Flood Forecast, to provide
better and earlier information to the public. A beta
version of this product was launched in May 2022. 
Options for developing forecasts of surface water
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical,
resource and communication challenges
associated with providing surface water
flooding guidance.
Page 69 of 354

Page 70

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/02 Kinloch Rannoch |27
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the Awareness Raising actions described
in Table 2 of this report, some additional progress
has been made in the Kinloch Rannoch PVA.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the planned awareness raising
activities described in Table 2 of this report,
the responsible authorities will continue with
awareness raising activities when
developing any proposals for the remaining
actions set out in the Tay Local Flood Risk
Management Plan.
Self Help
(80410011)
G
Refer to Description in Table 2. - Ongoing Further to the Self-Help actions described in Table 2
of this report, some additional progress has been
made in the Kinloch Rannoch PVA. The Scottish
Flood Forum’s (SFF) community engagement within
this PVA has included PLP exhibitions, selection,
surveys and providing appropriate and relevant
information to enable clients to make the right
decisions. The SFF has also provided ongoing
community PLP training, training for Flood Wardens
and resilience group promotion.  
Refer to planned actions described in Table
2 of this report.
Maintenance 
(80410007)
G
Refer to Description in Table 2. Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans /
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2. Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 70 of 354

Page 71

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/03 Aberfeldy and Pitlochry|28
3.2.3 Aberfeldy and Pitlochry PVA 08/03 
Local Plan District Local Authority Main Catchment
Tay Perth & Kinross Council River Tay 
Summary of Progress Within PVA 
There are approximately 240 residential properties and 130 non-residential properties at
risk of flooding in the Aberfeldy and Pitlochry PVA. The Annual Average Damages are
approximately £1.2 million.  Further information can be found in the Tay Local FRM Plan
under PVA 08/03.
This PVA has been exposed to recent significant weather events including Storms
Desmond and Frank in Dec 2015 and Jan 2016, which resulted in flooding in the Tay and
Tummel catchments. Surface Water flooding was experienced at various locations in
Aberfeldy in January 2018, August 2019 and February 2020 (Storm Dennis).
Key progress has been made with the two identified Flood Protection Studies within this
PVA. The Pitlochry flood study was completed in October 2018. The Aberfeldy Flood
Study was completed in October 2019. The Aberfeldy Flood Study also informed a related
action - maintenance of the existing Weem Flood Protection Scheme (ID 80060017) - by
reviewing the condition and standard of flood protection offered by the scheme.
There have been no significant changes affecting progress, but it is worth noting that there
may be future catchment changes due to the A9 Dualling project.
SEPA have also made progress on strategic mapping and modelling to improve the
existing flood maps for the Pitlochry area. Scottish Water have completed sewer flooding
assessments in Pitlochry and Aberfeldy. 
(© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved.
Reproduced from Tay Flood Risk Management
Strategy, SEPA, December 2015). 
Selected Actions in the Aberfeldy and Pitlochry PVA 08/03
PVA
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/03  G G   A G  G G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in the Aberfeldy and Pitlochry PVA
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Study
(80040005)
G
A flood protection study has been recommended
for Pitlochry to assess whether flood storage,
sediment management, modification of
conveyance and installation/ modification of fluvial
control structures could reduce flood risk. The
study should also consider property relocation.
The study should build on the previous study
carried out by Perth & Kinross Council in 2007
and consider flooding from small watercourses as
Perth &
Kinross
Council
2016 –
2018
The Pitlochry flood study was completed in October
2018 and recommended a flood scheme involving
a collection of actions to reduce flood risk in the
area. The proposed scheme would protect a total
of 104 properties, providing a 1 in 200-year
standard of flood protection, including a further
allowance for future climate change. The study
findings were disseminated via local community
drop-in sessions held on 20 & 27 February 2019.
This action is complete. 
The delivery of the recommended flood
scheme is subject to prioritisation and
inclusion in the next Tay Local FRM Plan
and funding being made available. The
scheme may then proceed to outline design,
the statutory process required by the Flood
Act, detailed design, procurement and
construction.
Page 71 of 354

Page 72

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/03 Aberfeldy and Pitlochry |29
well as the main river. The study should take a
catchment approach and consider the potential
benefits and dis-benefits and interaction between
actions upstream and downstream.
The Scottish Flood Forum supported the Council’s
consultation events for the flood study.
Flood
Protection
Study
(80050005)
G
A flood protection study has been recommended
for Aberfeldy to assess whether installation/
modification of fluvial control structures, direct
flood defences and sediment management could
reduce flood risk. The study should take a
catchment approach and consider the potential
benefits and dis-benefits and interaction between
actions upstream and downstream.
Perth &
Kinross
Council
2017 –
2019
The Aberfeldy flood study was completed in
October 2019 and recommended a flood scheme
involving new flood defences on the River Tay, the
Moness Burn and culvert improvements on the
Tomchulan Burn. The proposed scheme would
protect a total of 164 properties, providing a 1 in
200 year standard of flood protection. The study
findings were disseminated to the local community
via drop-in sessions on 20 and 25 June 2019.
This action is complete.
The delivery of the recommended flood
scheme is subject to prioritisation and
inclusion in the next Tay Local FRM Plan
and funding being made available.  The
scheme may then proceed to outline design,
the statutory process required by the Flood
Act, detailed design, procurement and
construction.
Maintain
Flood
Protection
Scheme
(80060017)
G
Continue to maintain the existing Weem Flood
Protection Scheme. The scheme was completed
in 2006 and includes a flood embankment and
pumping station. The scheme has a design
standard of protection of 1 in 100 years.
Perth &
Kinross
Council
Ongoing  Perth & Kinross Council's Roads Maintenance
Partnership carries out routine inspections of the
existing Weem Flood Protection Scheme.
Maintenance works are carried out as required. 
Recent works include maintenance and repairs to
the pumping station, clearance of the non-return
valve and vegetation management.  
The Weem Flood Protection Scheme was also re-
assessed as part of the Aberfeldy Flood Study
(Action ID 80050005). This included a condition
assessment and a review of the standard of
protection provided by the existing flood scheme.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be undertaken on an
annual basis and following flood events.
The maintenance works recommended by
the Aberfeldy flood study will be carried out,
subject to funding.
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
River Tummel and River Tay areas to improve
understanding of flood risk. The extent and timing
of improvements will depend on details scoping
and data availability. Where this work coincides
with local authority studies, SEPA will work
collaboratively to ensure consistent modelling
approaches are applied.  
SEPA 2016 –
2017 
Action partially complete. Updated river flood
hazard mapping for Pitlochry was published on the
SEPA web site in November 2020.       
SEPA began working on river mapping
updates in this area but upon review of the
available information it is not appropriate to
complete the update at this time. A review of
how modelling and mapping updates are
undertaken is being conducted to develop a
more effective method of regional and
national updates.    
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will undertake further investigation
and modelling in the Aberfeldy and Pitlochry
sewer catchments to improve knowledge and
understanding of flood risk in this area as required
under Section 16 of the Flood Risk Management
(Scotland) Act 2009.
Scottish
Water
Aberfeldy
2016 –
2017 
Pitlochry
2016 –
2019
The Scottish Water assessment of flood risk within
the Aberfeldy sewer catchment was delivered in
January 2020 
The Scottish Water assessment of flood risk within
the Pitlochry sewer catchment was delivered in
August 2018.
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Aberfeldy, Ballinluig to
Logierait, Logierait to Victoria Bridge, Pitlochry to
Ballinluig, River Tummel in Pitlochry and the
Upper Tay (from Taymouth Castle to Logierait)
flood warning areas which are part of the Tay river
flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood G Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood The Scottish Flood Forecast will be refined
Page 72 of 354

Page 73

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/03 Aberfeldy and Pitlochry |30
Forecasting
(80410009)
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80040012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Pitlochry Resilience Group operates in this area.
The group is in the process of developing a
community resilience plan which includes
mitigating the impact of flooding.
Community Ongoing The Pitlochry and Moulin Community Resilience
Group is established in this area. This group forms
part of the A9 Resilience Plan. The Community
Council is in the process of developing a
community resilience plan which includes
mitigating the impact of flooding. 
The Scottish Flood Forum has supported the
establishment of the Pitlochry Flood Group. At
present the Group is currently inactive. 
Perth & Kinross Council will continue to
coordinate with Pitlochry and Moulin
Community Resilience Group on a priority
needs basis where resources allow. 
The Scottish Flood Forum will engage
further with the Pitlochry Flood Group to re-
start the Group and help develop a
community flood plan.
Community
Flood Action
Groups
(80050012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Aberfeldy Resilience Group operates in this area.
Membership of the group includes Perth &
Kinross Council, SEPA, Tayside Fire and Rescue
and the Scottish Flood Forum. The group aims to
help reduce flooding to businesses and
communities within the Aberfeldy area, improve
joint working before, during and after flooding and
increase community resilience. 
Community Ongoing The Aberfeldy Resilience Group is established in
this area.
The Tayside Waders Group also operate within the
Aberfeldy area, focussing on flood risk in the
Tayside Place/Crescent areas. They have set up a
store of flood resilience equipment (pumps,
sandbags, etc) with support from the Scottish Flood
Forum. Sandbags were donated to the group from
the local distillery.  
The Scottish Flood Forum continue to support the
Tayside Waders Flood Action Group who have a
local community flood plan and resources to
respond to flooding.
Perth & Kinross Council will continue to
coordinate with the Aberfeldy Resilience
Group and the Tayside Waders on a priority
needs basis where resources allow.  
The Scottish Flood Forum will follow up on
engagement with Hillcrest Housing
Association, Perth & Kinross Council and
Tayside Waders on property flood resilience.
The Forum will engage further with the
Tayside Waders to assess any further
support required.   
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities 
Ongoing Further to the awareness raising actions described in
Table 2 of this report, some additional progress has
been made in the Aberfeldy and Pitlochry PVA. 
Following flooding in December 2015/January
2016, Perth & Kinross Council held de-briefing
sessions with the Aberfeldy Resilience Group,
Tayside Waders and Pitlochry Resilience Group.
The findings from the Pitlochry flood study (Action
Further to the planned actions described in
Table 2 of this report, Perth & Kinross
Council will continue with awareness raising
activities when developing proposals for the
remaining actions in its local flood risk
management plans. 
Page 73 of 354

Page 74

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/03 Aberfeldy and Pitlochry |31
ID 80040005) were disseminated to the local
community in February 2019. The findings from the
Aberfeldy flood study (Action ID 80050005) were
disseminated to the community in June 2019.
Working alongside other responsible authorities,
SEPA carried out awareness raising activities in
this location at the community drop-in sessions for
the Pitlochry Flood Study in 2019. Some planned
activities were impacted by the Covid-19 pandemic.
Self Help
(80410011)
G
Refer to Description in Table 2.  N/A Ongoing Further to the self-help activities described in Table
2 of this report, some additional activity has been
carried out in this PVA.
The Council’s Housing Service has fitted flood
protection products to 28 Council properties within
Aberfeldy (no Council properties are affected by
flooding in Pitlochry).
The Scottish Flood Forum carried out 10 property
flood resilience assessments in Pitlochry; further
engagement is required to evaluate the action
taken.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007) 
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset/ land
managers
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional activity has
been carried out in this PVA. Maintenance work
has been carried out to the Weem Flood Protection
Scheme as described above (Action ID 80060017).
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 74 of 354

Page 75

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/04 Alyth|32
3.2.4 Alyth PVA 08/04 
Local Plan District  Local authority  Main catchment 
Tay Perth & Kinross Council Alyth Burn (River Tay) 
Summary of Progress within PVA 
There are approximately 50 residential properties and 20 non-residential properties at risk of
flooding in the Alyth PVA. The Annual Average Damages are approximately £160,000. Further
information can be found in Tay Local FRM Plan under PVA 08/04. 
This PVA has been exposed to several recent significant weather events including including Storms
Desmond and Frank in December 2015 and January 2016 Although this did not result in any
significant flooding of properties, several roads and low-lying agricultural land were affected.
Although this did not result in any significant flooding of properties, several roads were affected in
the Alyth area. This followed on from an extreme flood event in July 2015 which affected
approximately 59 properties in Alyth.
Following the 2015 flood event, emergency works were carried out by Perth & Kinross Council to
remove debris from the burn and replace collapsed structures. Perth & Kinross Council, SEPA and
SNH produced a joint investigation report, which was disseminated to the public, as well as holding
various public events to improve awareness and promote resilience within the community.  The
Scottish Flood Forum also attended these events and has continued to support the community
through advice to the community council and residents.
In August 2020 a slow-moving storm impacted eastern Scotland, resulting in flooding from the Alyth
and Johnshill Burns. Approximately 18 properties were affected by flooding. The Council carried out
works on the Alyth Burn (to remove sediment and other debris deposited following the flood event)
and repaired two collapsed sections of culvert on the Johnshill Burn. The Doctors Burn also flooded
in August 2020 and twice in October 2020 as a result of high-water levels breaching a damaged
length of agricultural embankment; this was subsequently repaired by the landowner.  
There have been no significant changes within the catchment during the first LPD cycle, and a
natural flood management (NFM) study commenced in January 2022 and is on-going.
(© Crown copyright. SEPA licence
number 100016991 (2015). All rights
reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA, December
2015). 
Selected Actions in the Alyth PVA 08/04
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/04     A A G   G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Alyth (PVA 08/04)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Natural
Flood
Management
A
A natural flood management study has been
recommended for Alyth to assess whether
river/floodplain restoration and sediment
Perth &
Kinross
Council
2020-
2021
The Alyth natural flood management study
commenced in January 2022 and is on-going. The
contract was awarded to consulting engineers,
Once available, the draft study findings will
be disseminated via local community drop-in
sessions. The NFM study is programmed for
Page 75 of 354

Page 76

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/04 Alyth |33
Study
(80070003)
management could help reduce flood risk. The
study should take a catchment approach and
consider the potential benefits and disbenefits
and interaction between actions upstream and
downstream
AECOM Ltd. completion in 2023.
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk. Approximately
900km² of improved surface water data is
currently available within this Local Plan District.
SEPA 2016-
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
across Scotland and represents a significant change
in rainfall amounts compared to FEH99 dataset, as
such it is no longer consider appropriate to deliver
this action as originally intended.  This action will not
be taken forwards as described. A major national
update of the surface water maps is underway which
will deliver updated surface water flooding maps for
Scotland representing the latest scientific
understanding.  
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next
flood risk management cycle. 
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will undertake further investigation
and modelling in the Alyth sewer catchment to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
2016-
2018
The Scottish Water assessment of flood risk within
the Alyth sewer catchment was completed in
January 2020.
This action is complete.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities and
responders to reduce the impacts of flooding. SEPA
in partnership with the Met Office has developed a
public version of the daily Flood Guidance
Statement, the Scottish Flood Forecast, to provide
better and earlier information to the public. A beta
version of this product was launched in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical,
resource and communication challenges
associated with providing surface water
flooding guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Alyth PVA.
Following a severe flooding event in Alyth in July
2015, Perth & Kinross Council, SEPA and SNH
produced a joint investigation report into the
mechanisms of the event. This was made publicly
available and disseminated to the local community.
Newsletters were also produced providing updates
to residents regarding emergency works being
carried out, as well as available support and advice
about improving resilience for future flooding events.
Following further flooding in August 2020, the
Council issued flood bulletins, responded to
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will undertake
further awareness raising in conjunction with
the Alyth Natural Flood Management Study
(Action ID 80070003) which is programmed
for completion in 2023.
Page 76 of 354

Page 77

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/04 Alyth |34
correspondence and held an online community
meeting to raise awareness of flood risk. This
included liaison with the Community Council, the
Alyth Community Support Group and the Alyth
Development Trust. 
The Scottish Flood Forum also engaged with the
local community following the previous flood
incident. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal with
flooding.
The Alyth (Town Hall) Community Resilience Group
has developed a community emergency plan which
is generic in nature and available to support other
affected communities. 
Working alongside other responsible authorities,
SEPA carried out awareness raising activities in this
location, attending the post-flood online community
event in October 2020. Some planned activities
were impacted by the Covid-19 pandemic.
Self-Help
(80410011)
G
Refer to Description in Table 2. - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made in the Alyth PVA.
The Council’s Housing Service has fitted flood
protection products to 34 Council properties within
Alyth. 
The Scottish Flood Forum (SFF) are supporting the
development of Scotland’s first Retained Flood
Team in Alyth through training and learning
opportunities and implementing the community flood
plan.
The SFF held property flood resilience (PFR)
exhibitions and carried out 25 PFR assessments in
Alyth to support individual and community
responses to flooding.
The SFF delivered the Alyth Community Flood
Alerting System and are supporting its use with
Alyth Retained Flood Team. 
Alyth Development Trust secured National Lottery
funding to develop the Alyth Retained Flood Team.
Seven people recruited and SFF supporting the
development of a training and induction programme,
review of community flood plan and integrating
RiverTrack into response plans. A number of
properties have PFR and this needs to mapped
better and linked to better community resources.
Refer to planned actions described in Table
2 of this report.
The Council’s Housing Service are planning
to fit flood protection products to a further 10
Council properties within Alyth.
The Scottish Flood Forum are planning
training sessions on natural flood
management and an introduction to FRM in
late 2022.
Maintenance
(80410007)  G Refer to Description in Table 2. Perth &
Kinross
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
Refer to planned actions described in Table
2 of this report.
Page 77 of 354

Page 78

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/04 Alyth |35
Council,
asset / land
managers
described in Table 2 of this report.
Following the August 2020 flooding, the Council
carried out emergency clearance works on the Alyth
Burn (to remove sediment and other debris
deposited following the flood event) and repaired
two collapsed sections of culvert on the Johnshill
Burn.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency plans/response actions
have been carried out in this PVA, beyond those
already described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2. Planning
authority
Ongoing No additional planning policies activities have been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 78 of 354

Page 79

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/05 Kirriemuir and Forfar|36
3.2.5 Kirriemuir & Forfar PVA 08/05 
Local Plan District  Local authority  Main catchment 
Tay Angus Council River Tay 
Summary of Progress within PVA 
There are approximately 150 residential properties and 80 non-residential properties at risk of
flooding in the Kirriemuir and Forfar PVA. The Annual Average Damages are approximately
£950,000. Further information can be found in Tay Local FRM Plan under PVA 08/05. 
The PVA has been experienced significant weather events including Storms Desmond and Frank in
December 2015 and January 2016, which resulted in flooding in the upper Tay catchment.
Key progress has been made with the completion of a flood protection study for Kirriemuir and Forfar.  
SEPA have also made progress on strategic mapping and modelling undertaking a screening
exercise to characterise the catchments of the Dean Water and Gairie Burn. This will be completed
pending a review of how modelling and mapping updates are undertaken to develop a more effective
method of regional and national updates. 
© Crown copyright. SEPA licence
number 100016991 (2015). All rights
reserved. Reproduced from Tay Flood
Risk Management Strategy, SEPA
(December 2015). 
Selected Actions in Kirriemuir & Forfar PVA 08/05
PVA
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/05  G G   A G   G  G G  G G  G G 
Summary of Progress of Actions to Manage Flood Risk in Kirriemuir and Forfar (PVA 08/05)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Study
(80110005)
G
Angus Council will undertake a flood protection
study for Forfar to be delivered by financial year
2019/20. This will assess whether flood storage,
modification of conveyance, direct flood defences,
sediment management and natural flood
management could reduce flood risk. The study
will also consider the viability of property level
protection and will include surface water
investigations in partnership with Scottish Water.
The study will take a catchment approach
considering the interactions between both
upstream and downstream.
Angus
Council
2016 -
2020
The fluvial/NFM studies for Forfar were
incorporated within the scope of Angus Council’s
Kirriemuir and Forfar Flood Protection Study. The
study is complete.
This action is complete.
Page 79 of 354

Page 80

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/05 Kirriemuir and Forfar |37
Angus Council will coordinate the study with
Scottish Water, SEPA and Landowners, etc.
Flood
Protection
Study
(80100005)
G
A flood protection study has been recommended
for Kirriemuir to assess whether flood storage,
sediment management, modification of
conveyance, direct flood defences and natural
flood management could reduce flood risk.
Natural flood management options that should be
considered include floodplain restoration and
sediment management. The study should also
consider the viability of property level protection
and property relocation. The study will take a
catchment approach considering the interactions
between both upstream and downstream.
Angus Council will coordinate the study with
Scottish Water, SEPA and Landowners, etc.
Angus
Council
2016 -
2020
The fluvial/NFM studies for Kirriemuir were
incorporated within the scope of Angus Council’s
Kirriemuir and Forfar Flood Protection Study. The
study is complete.
This action is complete.
Maintain
Flood
Protection
Scheme
(80100017)
G
The existing Kirriemuir Flood Prevention Scheme
provides protection from the Gairie Burn. Angus
Council will maintain the existing Flood Protection
Scheme ensuring works are coordinated and
infrastructure is fully assessed. This will be done
by undertaking routine, reactive, programmed,
regulatory and emergency response inspections.
This work will be carried out by Angus Council
engineers on a priority needs basis as resource
allows. The general maintenance standard target
is to conduct watercourse inspections annually
and structural inspections biennially.
Angus
Council
2016 -
2022
The existing Kirriemuir - Gairie Burn flood
prevention scheme is inspected within Angus
Council's watercourse inspection programme. 
Remedial work is identified and programmed with
other identified priorities.
Recent improvements have included the repair and
reinstatement of a flood wall following inspection.
Angus Council will continue to inspect the
Kirriemuir - Gairie Burn Flood Protection
Scheme and prioritise its maintenance to
ensure the maximum possible level of
protection is maintained.
Angus Council will continue to engage with J
and D Wilkies on a regular basis as the main
receptor of flooding to seek their views on
the efficiency of the scheme. 
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
Dean Water and Gairie Burn areas to improve
understanding of flood risk. The extent and timing
of improvements will depend on detailed scoping
and data availability. Where this work coincides
with local authority studies, SEPA will work
collaboratively to ensure consistent modelling
approaches are applied.
SEPA 2017-
2018
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates. 
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. 
Scottish Water will undertake further investigation
and modelling within the Kirriemuir & Forfar sewer
catchments to improve knowledge and
understanding of surface water flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009. 
Scottish
Water
Forfar
2016-
2019 
Kirriemuir
2016-
2019
The Scottish Water assessment of flood risk within
the Forfar sewer catchment was completed in
January 2017. 
The Scottish Water assessment of flood risk within
the Kirriemuir sewer catchment was completed in
June 2019. 
This action is complete. 
Flood
Forecasting
(80410009) G
Refer to Description in Table 2.  SEPA 2016 -
2022
SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
Page 80 of 354

Page 81

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/05 Kirriemuir and Forfar |38
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
2016 -
2022
Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Kirriemuir and Forfar PVA.
Angus Council held public consultations as part of
the Kirriemuir and Forfar flood study.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report. 
Self Help
(80410011) G
Refer to Description in Table 2.  - 2016 -
2022
No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80080018)
G
Angus Council will prepare Surface Water
Management Plans (SWMPs) to cover Forfar.
This will identify the most sustainable measures to
manage urban drainage and the risk of surface
water flooding, as well as sources of flooding such
as the sewer network, watercourses and sea. This
will establish a long-term action plan for each area
to manage surface water and influence future
capital investment, drainage maintenance, land-
use planning, emergency planning etc. Angus
Council will co-ordinate this work with Scottish
Water and SEPA through the Local Plan District
partnership with delivery of the SWMP by
2019/2020.
Angus
Council
Forfar
2016 -
2020 
Kirriemuir
2016 -
2020
The Kirriemuir and Forfar Flood Protection Study –
which incorporated this SWMP - is complete.
This action is complete.
Maintenance 
(80410007) G
Refer to Description in Table 2.  Angus
Council,
asset / land
managers
2016 -
2022
No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
responders
2016 -
2022
No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
authority
2016 -
2022
No additional planning policy activities have been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 81 of 354

Page 82

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/06 Blairgowrie|39
3.2.6 Blairgowrie PVA 08/06 
Summary of Progress within PVA 
There are approximately 30 residential properties and 60 non-residential properties at risk of flooding
in the Blairgowrie PVA. The Annual Average Damages are approximately £120,000. Further
information can be found in Tay Local FRM Plan under PVA 08/06. 
This PVA has been exposed to significant weather events including Storms Desmond and Frank in
December 2015 and January 2016, although this did not result in any significant flooding of
properties. However, more recent flooding occurred in August 2020 and in October 2021, resulting in
flooding to a small number of properties.
Scottish Water have delivered an assessment of flood risk within the Blairgowrie sewer catchment.
SEPA has continued to operate a flood warning and flood forecasting service in this PVA.
Perth & Kinross Council has supported the Blairgowrie Community Resilience Group to develop its
community emergency plan. 
There have been no significant changes within the catchment during the first LPD cycle. A Surface
Water Management Plan (SWMP) commenced in October 2022 and is on-going. © Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Blairgowrie PVA 08/06
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/06      G  G G  G G  A G  G G 
Summary of Progress of Actions to Manage Flood Risk in Blairgowrie (PVA 08/06)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will undertake further investigation
and modelling in the Blairgowrie sewer catchment
to improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
2016-
2018
The Scottish Water assessment of flood risk within
the Blairgowrie sewer catchment was completed in
July 2018.
This action is complete.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Blairgowrie to the River
Isla flood warning area which is part of the Ericht
river flood warning scheme. 
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Ericht (River Tay)
Page 82 of 354

Page 83

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/06 Blairgowrie |40
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Blairgowrie PVA.
Blairgowrie Community Resilience Group has
developed a community emergency plan which is
generic in nature and is available to support other
affected communities.
Perth & Kinross Council issued community bulletins
and answers to frequently asked questions
following the flooding in August 2020 and October
2021 in order to provide advice and raise
awareness of flooding in the local community.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the awareness raising described
in Table 2 of this report, Perth & Kinross
Council will carry out awareness raising
activity as part of the Blairgowrie Surface
Water Management Plan (Action ID
80120018) which commenced in October
2022.
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those described in Table 2
of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80120018)
A
The area must be covered by a surface water
management plan or plans that set objectives for
the management of surface water flood risk and
identify the most sustainable actions to achieve
the objectives.
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process
Perth &
Kinross
Council
2020-
2022
The Blairgowrie surface water management plan
(SWMP) commenced in October 2022 and is on-
going. The contract was awarded to consulting
engineers, RSK Environmental Ltd.
Scottish Water have provided Section 16 outputs to
support the SWMP.  
Once available, the findings from the draft
surface water management plan will be
disseminated via local community drop-in
sessions. The surface water management
plan is programmed for completion in 2024.
Maintenance
(80410007)  G Refer to Description in Table 2.  Perth &
Kinross
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those described in
Refer to planned actions described in Table
2 of this report.
Page 83 of 354

Page 84

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/06 Blairgowrie |41
Council,
asset / land
managers
Table 2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
authority
Ongoing No additional planning policies activities have been
carried out in this PVA, beyond those described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 84 of 354

Page 85

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/07 Coupar Angus|42
3.2.7 Coupar Angus PVA 08/07 
Local Plan District Local Authority Main River Catchment
Tay Perth & Kinross Council Coupar Burn (River Tay) 
Summary of Progress within PVA 
There are approximately 10 residential properties and fewer than 10 non-residential
properties at risk of flooding in the Coupar Angus PVA. The Annual Average Damages
are approximately £26,000. Further information can be found in Tay Local FRM Plan
under PVA 08/07. 
The PVA was exposed to significant weather events including Storms Desmond and
Frank in Dec 2015 and Jan 2016 respectively, with several roads affected in the
Coupar Angus area. The ‘Beast from the East’ (March 2018) brought about significant
levels of snow fall across the PVA, although a gradual thaw limited any flooding issues
resulting from snowmelt.
Flood hazard mapping improvements have been made in this area by SEPA.
Scottish Water has delivered an assessment of flood risk within the Coupar Angus
sewer catchment.
SEPA, Perth & Kinross Council and the Scottish Flood Forum have engaged with the
community in this PVA. The Coupar Angus Community Resilience Group had
previously developed a community emergency plan, but the Group is currently
understood to be inactive.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Coupar Angus PVA 08/07
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/07      G   G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Coupar Angus (PVA 08/07)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016) G
SEPA will seek to develop flood mapping in the
Burrelton Burn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016 Following a screening exercise to characterise the
catchment, no changes to the existing flood
mapping were deemed necessary for the Burrelton
Burn. Within the wider PVA, improvements to the
river hazard mapping for the Coupar, Kettins and
Kinnochtry Burns were undertaken in 2015 with the
inclusion of a local authority study.
This action is complete.
Strategic
Mapping and
Modelling
G
Scottish Water will undertake further investigation
and modelling in the Coupar Angus sewer
catchments to improve knowledge and
Scottish
Water
2016 -
2022
The Scottish Water assessment of flood risk within
the Coupar Angus sewer catchment was completed
in July 2018.
This action is complete.
Page 85 of 354

Page 86

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/07 Coupar Angus |43
(80410019) understanding of flood risk in this area as required
under Section 16 of the Flood Risk Management
(Scotland) Act 2009
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2. Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within the Coupar Angus PVA.
Community drop-in sessions were arranged in
Coupar Angus in September 2016 following the
completion of a flood scheme feasibility study. 
These events were attended by the Council, SEPA
and the Scottish Flood Forum. These sessions
highlighted to the community that a flood scheme
was not economically viable and how on-going
flood risk would be managed (via the other actions
identified in the Tay Local Flood Risk Management
Plan). This activity was coordinated with the
Coupar Angus Community Resilience Group.
The Scottish Flood Forum (SFF) also engaged with
the local community following previous flooding.
This included initial community engagement with
both the Community Council and the wider
community, exploring possible options regarding
future SEPA and Local Authority engagement. The
SFF provided a presentation and appropriate
advice to support the short-term strategic
development of the community to deal with
flooding.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid 19.
Refer to the planned actions described in
Table 2 of this report
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing Further to the emergency plans/response actions
described in Table 2 of this report, some additional
progress has been made within the Coupar Angus
Refer to planned actions described in Table
2 of this report.
The Scottish Flood Forum has identified
Page 86 of 354

Page 87

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/07 Coupar Angus |44
PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has previously
included property level protection (PLP) exhibitions,
selection, surveys and the provision of appropriate
and relevant information to enable clients to make
the right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion. 
The Coupar Angus Community Resilience Group is
currently inactive. The Group had previously
developed a community emergency plan which was
generic in nature and was available to support
other affected communities.
Coupar Angus as a potential site for a
community flood alerting system. Further
engagement is required with the local
community as the Community Resilience
Group is currently inactive. 
Maintenance
(80410007)
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 87 of 354

Page 88

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam|45
3.2.8 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam PVA 08/08 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Tay 
Summary of Progress within PVA 
There are approximately 360 residential properties and 130 non-residential properties at risk of
flooding in this PVA. The Annual Average Damages are approximately £740,000. Further
information can be found in Tay Local FRM Plan under PVA 08/08. 
This PVA has been exposed to significant weather events including Storms Desmond and Frank in
December 2015 and January 2016, which resulted in localised surface water flooding in Bankfoot.
Further flooding occurred in February 2018, August 2020 and February 2021 in Bankfoot and
Dunkeld. However, only a small number of properties were affected by these events.
Following previous investigations into a flood scheme in Bankfoot, community drop-in events were
held in 2016 to raise awareness of how flood risk would be managed in future within the PVA. The
events were attended by Perth & Kinross Council, SEPA, Scottish Water and Scottish Flood Forum.
Perth & Kinross Council carried out clearance and repair works in Bankfoot in 2017, to improve
channel conveyance and reduce surface water issues.
Scottish Water has delivered two assessments of flood risk within the Bankfoot and Dunkeld sewer
catchments.
A number of Community Resilience Groups within the PVA have developed emergency plans which
can be activated during significant flood events. This includes Auchtergaven Community Council and
Bankfoot Resilience Group, who communicate with the Council and receive updates regarding any
flood risk management activities in the area. 
There have been no significant changes affecting progress but it is worth noting that the A9 Dualling
project is still ongoing, which may result in some future catchment changes.
The Dunkeld flood study commenced in January 2020 and is on-going, with completion anticipated
by the end of 2022. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Luncarty, Stanley, Bankfoot, Dunkeld & Birnam PVA 08/08
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/08  A    A G  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Luncarty, Stanley, Bankfoot, Dunkeld & Birnam (PVA 08/08)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Study
(80170005)
A
A flood protection study has been recommended
for Dunkeld to assess whether modification of
conveyance, direct flood defences and sediment
management could reduce flood risk. The study
should build on previous studies and take a
Perth &
Kinross
Council
2019 -
2021
The Dunkeld Flood Protection Study commenced in
January 2020 and is nearing completion. The
contract was awarded to consulting engineers,
AECOM Ltd. 
Once available, the draft study findings will
be disseminated via local community drop-in
sessions. The study is programmed for
completion by the end of 2022.
Page 88 of 354

Page 89

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam |46
staged approach to allow collaboration with SEPA
on strategic mapping and modelling for the Tay.
The study should take a catchment approach and
consider the potential benefits and disbenefits and
interaction between actions upstream and
downstream.
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
River Tay area to improve understanding of flood
risk. The extent and timing of improvements will
depend on detailed scoping and data availability.
Where this work coincides with local authority
studies, SEPA will work collaboratively to ensure
consistent modelling approaches are applied.
SEPA 2016
onwards
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Bankfoot
and Dunkeld sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Scottish
Water
Bankfoot
2016 -
2018 
Dunkeld
2016 -
2017
The Scottish Water assessment of flood risk within
the Bankfoot sewer catchment was completed in
May 2018. 
The Scottish Water assessment of flood risk within
the Dunkeld sewer catchment was completed in
February 2018. 
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Boat of Murthly, Caputh
to Kinclaven, Dalguise, Dunkeld and Burnmouth
Road, Logierait to Victoria Bridge and the Stanley
Mills flood warning areas which are part of the
Tay river flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013) G
Refer to Description in Table 2.  Responsible
Authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Community drop-in sessions were arranged in
Bankfoot in September 2016 following the
Further to the awareness raising described
in Table 2 of this report, Perth & Kinross
Council will continue with awareness raising
activities when developing proposals for the
remaining actions in the Tay Local Flood
Page 89 of 354

Page 90

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam |47
completion of a flood scheme feasibility study.
These events were attended by the Council, SEPA,
Scottish Water and the Scottish Flood Forum.
These sessions highlighted to the community that a
flood scheme was not economically viable and how
on-going flood risk would be managed (via the
other actions identified in the Tay Local Flood Risk
Management Plan).
Perth & Kinross Council engaged in on-going
communications with Bankfoot Community Council
and the Bankfoot Community Resilience Group.
Updates on clearance and repair works carried out
in the Bankfoot area have been provided to both of
these groups.
The Scottish Flood Forum also engaged with the
local community in Bankfoot following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding.
Stanley, Bankfoot, Dunkeld & Birnam Community
Resilience Groups have developed community
emergency plans which are generic in nature and
are available to support other affected
communities.
Working alongside other responsible authorities,
SEPA carried out awareness raising activities in
this location. Some planned activities were
impacted by the Covid-19 pandemic.  
Risk Management Plan. This will be
extended to the other communities at risk of
flooding in this PVA in the Cycle 2 Tay Local
FRM Plan.
Self Help
(80410011)
G
Refer to Description in Table 2.  - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made within this PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
The Scottish Flood Forum supported the Bankfoot
Community Resilience Group but understand they
are currently inactive.
The SFF have provided property flood resilience
advice to a few residents in Bankfoot impacted by
flooding.
Refer to planned actions described in Table
2 of this report.
The Scottish Flood Forum has identified
Bankfoot as a potential site for a community
flood alert system. Further engagement is
required to assess feasibility.  
Maintenance
(80410007)  G Refer to Description in Table 2.  Perth &
Kinross
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
Refer to planned actions described in Table
2 of this report.
Page 90 of 354

Page 91

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam |48
Council,
asset / land
managers
been made within this PVA.
Significant clearance and repair works were carried
out in Bankfoot. In 2017, road drainage
improvements were made at Tulliebelton Road (to
reduce the risk of surface water flooding issues at
this location) and sediment management works
were carried out at two locations on the
Glenshauch Burn. Perth & Kinross Council carried
out further road drainage improvements at Dunkeld
Road, Bankfoot in 2019. 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 91 of 354

Page 92

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/09 Tyndrum & Crianlarich|49
3.2.9 Tyndrum and Crianlarich PVA 08/09 
Local Plan District Local authority Main catchment
Tay Stirling Council River Tay 
Summary of Progress Within PVA 
There are approximately 20 residential properties and 10 non-residential properties at
risk of flooding in the Tyndrum and Crianlarich PVA. The Annual Average Damages
are approximately £160,000. Further information can be found in Tay Local FRM Plan
under PVA 08/09. 
This PVA has been exposed to recent significant weather events including Storms
Desmond and Frank in Dec 2015 and Jan 2016 respectively. More recently the ‘Beast
from the East’ (March 2018) brought about significant levels of snow fall across the
PVA, although a gradual thaw limited any flooding issues resulting from snowmelt.
Stirling Council is actively undertaking watercourse inspections to identify areas of
high risk of localised flooding. Where problems are identified and are within Council
land, remedial works are identified.  These works are prioritised annually on a
clearance and repair schedule based on the level of risk and on the annual
maintenance budget. Where problems are identified within private ownership the
Council will notify the owner of the remedial works required. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Tyndrum & Crianlarich PVA 08/09
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/09      R   G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Tyndrum & Crianlarich (PVA 08/09)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016)
R
SEPA will seek to develop flood mapping in the
River Fillin area to improve understanding of flood
risk. The extent and timing of improvements will
depend on detailed scoping and data availability.
SEPA 2018-
2019
A detailed screening exercise has been undertaken
to identify those outstanding modelling and
mapping actions with potential multi benefits for
Flooding, River Basin Management Planning 2027
priorities and development pressures. The outcome
of this review has indicated that this catchment is
not within a 2021 Objective Target Area and
doesn't provide any multiple benefits. A decision
has therefore been made not to progress this
action any further.      
This action will not progress any further.
Page 92 of 354

Page 93

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/09 Tyndrum & Crianlarich |50
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011) G Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007) G
Refer to Description in Table 2.  Stirling
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 93 of 354

Page 94

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/10 Almondbank|51
3.2.10 Almondbank PVA 08/10 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Almond (River Tay) 
Summary of Progress Within PVA 
There are approximately 50 residential properties and 110 non-residential properties at risk of
flooding in the Almondbank PVA. The Annual Average Damages are approximately £1.2 million. 
Further information can be found in Tay Local FRM Plan under PVA 08/10. 
There have been significant weather events in this PVA since the publication of the Tay Local FRM
Plan. Water levels on the River Almond were high during flood events on 12 August 2020, 31
October 2021 and 8 September 2022 but the flood defences protected properties. Some minor
flooding occurred in August 2020 at Lochty Industrial Estate.
Significant progress has been made in the PVA since the publication of the Tay Local FRM Plan. 
The Almondbank Flood Protection Scheme is substantially complete and operational. The scheme
has reduced flood risk to approximately 31 residential and 48 non-residential properties and has
delivered additional benefits to the community through improvements to leisure facilities and the
national cycle network. 
Awareness raising and community engagement were carried out in conjunction with the construction
of the flood scheme and to keep the community updated on progress. The Scottish Flood Forum
continues to support the community.
Following previous riverbank erosion, Perth & Kinross Council completed emergency erosion
protection works and repairs to a drainage outfall on the River Almond at Inveralmond, Perth in
2017. Scottish Water also completed repairs to an adjacent drainage outfall.
SEPA have commenced flood mapping improvements in this area.
Scottish Water has completed assessments of flood risk within the Almondbank sewer catchment
and the Perth City sewer catchment.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved.
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Almondbank PVA 08/10
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/10 G  G   A A G  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Almondbank (PVA 08/10)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80200006)
G
The Almondbank Flood Protection Scheme is
currently under construction and is scheduled to
be completed by summer 2017. The scheme will
reduce the risk of flooding to Almondbank from
the River Almond and East Pow Burn. The
scheme includes flood defences, flood storage,
Perth &
Kinross
Council
2016-
2017
The flood scheme was substantially complete in
September 2018. All works are complete with the
exception of an electrical connection and
commissioning of 5 pumping stations. 
The flood scheme is substantially complete.
The outstanding works to the pumping
stations are programmed to be completed by
early 2023.
Page 94 of 354

Page 95

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/10 Almondbank |52
bridge raising and surface water actions. The
scheme will offer a 1 in 200 year standard of
protection. 
Maintain
Flood
Protection
Scheme
(80200017) G
Continue to maintain the existing flood protection
schemes that protect Almondbank and Perth
against flooding. The schemes include the Perth
Flood Protection Scheme that was completed
2002 and Almondbank Flood Protection Scheme
which is currently under construction and due to
be completed in 2016. 
Perth &
Kinross
Council
2016 -
2022
Perth & Kinross Council's Roads Maintenance
Partnership carries out routine inspections of the
existing Perth Flood Protection Scheme and the
Almondbank Flood Protection Scheme.
Maintenance works are carried out as required.
River bank erosion works and outfall repairs were
completed at Inveralmond in 2017. 
Routine inspections of the Perth Flood
Protection Scheme and the Almondbank
Flood Protection Scheme will continue to be
carried out as part of the Council's statutory
duties. Maintenance works will be carried out
as required. 
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
River Almond area (from Newton to the River Tay
confluence) to improve understanding of flood
risk. The extent and timing of improvements will
depend on detailed scoping and data availability.
SEPA 2017 SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time. 
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.  
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk. Approximately 900km²
of improved surface water data is currently
available within this Local Plan District.
SEPA 2016 -
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
across Scotland and represents a significant
change in rainfall amounts compared to FEH99
dataset, as such it is no longer consider
appropriate to deliver this action as originally
intended.  This action will not be taken forwards as
described. A major national update of the surface
water maps is underway which will deliver updated
surface water flooding maps for Scotland
representing the latest scientific understanding.  
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next
flood risk management cycle.
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the
Almondbank and Perth City sewer catchments to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
Almond-
bank
2016 -
2018 
Perth City
2016 -
2018
The Scottish Water assessment of flood risk within
the Almondbank sewer catchment was completed
in October 2017. 
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019.
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Almondbank and the
Inveralmond Industrial Estate flood warning areas
which are part of the Almond (Perth) river flood
warning scheme. When flood events occur in an
area with an existing flood warning service, SEPA
will seek to verify the flood forecasts and
warnings. SEPA will use feedback and post-event
data to ensure that our flood warning service is
timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009) G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
Page 95 of 354

Page 96

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/10 Almondbank |53
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
Authorities 
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Perth & Kinross Council carried out awareness
raising activity during the implementation of the
Almondbank Flood Protection Scheme. A project
specific website was set up and regular newsletters
issued to the community throughout the
construction phase of the flood scheme.
The Scottish Flood Forum (SFF) has also engaged
with the local community following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011)
G
Refer to Description in Table 2.  - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made within this PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007)  G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
been made within this PVA.
Following previous riverbank erosion, Perth &
Refer to planned actions described in Table
2 of this report.
Page 96 of 354

Page 97

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/10 Almondbank |54
managers Kinross Council completed erosion protection
works and repairs to a drainage outfall on the River
Almond at Inveralmond, Perth in 2017.
Scottish Water also completed repairs to an
adjacent drainage outfall in 2017. 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 97 of 354

Page 98

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/11 Scone|55
3.2.11 Scone PVA 08/11 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Annaty Burn (River Tay) 
Summary of Progress Within PVA 
There are approximately 40 residential properties and 50 non-residential properties at risk of flooding
in the Scone PVA. The Annual Average Damages are approximately £320,000. Further information
can be found in Tay Local FRM Plan under PVA 08/11.
This PVA has been exposed to recent significant weather events. In May 2017, heavy rainfall led to 
roads in the area being flooded. Heavy rain on 11 and 12 August 2020 led to surface water flood
water outside some properties to rise up to the level of airbricks. The most recent flood was recorded
February 2021 when multiple areas across Perth and Kinross were affected, including Scone.
The commencement of the Scone Flood Protection Scheme has been deferred due to a pause in the
capital grant funding. The commencement of the Scone Flood Study has been delayed but will
commence in the 2022/23 financial year.
The Council has continued to carry out a biennial CCTV survey of the barrel drain. The Council also
carried out sediment management and debris clearance works on the Annaty Burn (at the A94 Road
Bridge) in 2017, 2020 and 2021.
Scottish Water has delivered an assessment of flood risk within the Scone sewer catchment and
commenced a further assessment for the Perth City sewer catchment.
There have been no major changes to this catchment, although a housing development and road
infrastructure improvement project are to be implemented at the northern extents of Scone.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015) 
Selected Actions in the Scone PVA 08/11
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/11 R R    G   G  G G  R G  G G 
Summary of Progress of Actions to Manage Flood Risk in Scone (PVA 08/11)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80230006) R
A flood protection scheme has been proposed to
address the risk of river flooding to the
Goshenbank Park and Burnside area in Scone
from the Annaty Burn. The preferred option
consists of raising existing footbridges and
constructing riverside defences. The scheme
would provide a 1 in 200 year standard of
protection. Outline design development of the
scheme is expected to commence in the 2018/19
financial year.
Perth &
Kinross
Council
2018 -
2021
The commencement of the outline design of the
Scone (Annaty Burn) Flood Protection Scheme has
been deferred due to a pause in capital grant
funding. 
The flood protection scheme was
programmed for completion in 2024/25, but
that is now subject to capital grant funding. 
Flood R A flood protection study has been carried out by Perth & 2020 - The Scone Flood Protection Study is programmed The study is programmed for completion in
Page 98 of 354

Page 99

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/11 Scone |56
Protection
Study
(80230005)
Perth & Kinross Council for the Annaty Burn,
Scone in 2007. The study identified a viable flood
protection scheme that is currently being
progressed as a priority in the first flood risk
management cycle. Further study has been
recommended to supplement the previous
investigations, looking at natural flood
management and surface water flooding (see also
Action ID 80210018). Natural flood management
options that should be considered include river/
floodplain restoration and sediment management.
The study should also investigate the viability of
property level protection. The study should take a
catchment approach and consider the potential
benefits and disbenefits and interaction between
actions upstream and downstream.
Perth & Kinross Council has also carried out a
flood protection study for the barrel drain in Scone
in 2007 which did not identify a viable flood
protection scheme. However, the Perth & Kinross
Council intends to re-examine this previous study
following recent drain failures and this will be
carried out in conjunction with the studies
identified above.
Kinross
Council
2022 to commence in the 2022/23 financial year.  the 2024/25 financial year. 
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Perth
City and Scone sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Scottish
Water
Perth City
2016-
2019 
Scone
2016 -
2019
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019. 
The Scottish Water assessment of flood risk within
the Scone sewer catchment was completed in
September 2017.  
This action is complete.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013) G
Refer to Description in Table 2.  Responsible
Authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Perth & Kinross Council has engaged with Scone
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will carry out
awareness raising activities in conjunction
Page 99 of 354

Page 100

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/11 Scone |57
community council. The Council carries out a bi-
annual CCTV survey of the barrel drain in Scone
and the results of this survey are shared with the
Community Council. This helps to raise awareness
of the responsibilities of landowners regarding the
drain. Discussions were also held around the
flooding and drainage proposals for the housing
development in Scone (north). 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
with the Scone (Annaty Burn) Flood
Protection Scheme, the Scone Flood
Protection Study and Surface Water
Management Plan (Action IDs 80230005,
80230006 & 80210018) which are
programmed to commence in 2022/23. The
Council will continue to engage with the
Community Council and local landowners
regarding the results of future CCTV surveys
of the barrel drain.
Self Help
(80410011) G
Refer to Description in Table 2.  - Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80210018)
R
The area must be covered by a surface water
management plan or plans that set objectives for
the management of surface water flood risk and
identify the most sustainable actions to achieve
the objectives.
This surface water management plan will be
delivered by Perth & Kinross Council as part of
the flood protection study (Action ID 80230005).
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process.
Perth &
Kinross
Council
2020 -
2022
The Scone surface water management plan is
programmed to commence in the 2022/23 financial
year. 
The surface water management plan is
programmed for completion in the 2024/25
financial year. 
Maintenance
(80410007) 
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
been made within this PVA.
Recent maintenance carried out by Perth and
Kinross Council included sediment management
and debris clearance works on the Annaty Burn (at
the A94 Road Bridge) in 2017, 2020 and 2021.
Perth & Kinross Council is also committed to
carrying out a bi-annual CCTV inspection of the
barrel drain, with any identified defects being
referred to the relevant landowners for action.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 100 of 354

Page 101

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/12 Perth to Kinfauns (north of A90) |58
3.2.12 Perth to Kinfauns (north of A90) PVA 08/12 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Tay 
Summary of Progress Within PVA 
There are approximately 80 residential properties and 20 non-residential properties at
risk of flooding in this PVA. The Annual Average Damages are approximately
£180,000.  Further information can be found in Tay Local FRM Plan under PVA 08/12. 
This PVA has been exposed to significant weather events including Storms Desmond
and Frank in Dec 2015 and Jan 2016 respectively, with several properties and roads
affected. The ‘Beast from the East’ (March 2018) brought about significant levels of
snow fall across the PVA, although a gradual thaw limited any flooding issues
resulting from snowmelt. More recently Perth was affected by surface water flooding in
August 2020, September 2022 and November 2022 although relatively few properties
were affected in this PVA.
Scottish Water and Perth & Kinross Council worked in partnership on the Perth
Integrated Catchment Study (ICS), which was completed in 2019. The optioneering
phase (to consider potential solutions to the identified flooding issues in five high
priority areas) is nearing completion.
Scottish Water has completed assessments of flood risk within the Perth City and
Scone sewer catchments.
SEPA have continued to provide a flood forecasting service and operate their existing
flood warning system in this PVA.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Perth to Kinfauns (north of A90) PVA 08/12
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/12 A  G   G  G G  G G  A G G  G G 
Summary of Progress of Actions to Manage Flood Risk in Perth to Kinfauns (north of A90) (PVA 08/12)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80240006)
A
Flood protection works have been proposed at
Bridgend in Perth to reduce the risk of surface
water flooding. The proposed works include a
high capacity drainage channel and outfall to the
River Tay. Outline design of the works will
commence in 2019/20.
Perth &
Kinross
Council
2019 -
2021
Work to produce an economic appraisal, update
the outline design and produce a detailed design
for the Bridgend flood protection works 
commenced in March 2021. The contract was
awarded to consulting engineers, RPS Consulting
Ltd and the detailed design is anticipated to be
completed in the 2022/23 financial year.
The flood protection works are programmed
for completion in the 2023/24 financial year,
subject to completion of detailed design and
funding. 
Maintain
Flood G Continue to maintain the existing Perth Flood
Protection Scheme along the east bank of the
Perth &
Kinross
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
Routine inspections will continue to be
carried out as part of the Council's statutory
Page 101 of 354

Page 102

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/12 Perth to Kinfauns (north of A90) |59
Protection
Scheme
(80260017)
River Tay. The scheme was completed in 2002
and includes major flood defence works such as
embankments, walls, sluice gates, ponds and
pumping stations.
Council existing flood defences in Perth. Maintenance
works are carried out as required. 
Recent works have included repairs to flood gates,
access improvements and trash screen
maintenance.
A full pseudo-closure of the flood gates on the
Perth Flood Protection Scheme is carried out
annually to test the operation of the scheme and
ensure operatives are fully trained in the event of a
flood. This also serves to highlight any
maintenance issues that may require to be
addressed.
duties.  Inspections will be carried out on an
annual basis and following flood events.
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Perth
City and Scone sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Scottish
Water
Perth City
2016 -
2018 
Scone
2016 -
2019
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019. 
The Scottish Water assessment of flood risk within
the Scone sewer catchment was completed in
September 2017.
This action is complete.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Basement Properties
from North Inch to Friarton Bridge flood warning
area which is part of the Tay river flood warning
scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013) G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Following widespread surface water flooding in
Perth in August 2020, the Council issued flood
bulletins, responded to correspondence and held a
series of online community meetings to raise
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will carry out further
awareness raising activity in conjunction with
the Perth Surface Water Management Plan
and flood protection works at Bridgend
(Action IDs 80240018 & 80240006).
Page 102 of 354

Page 103

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/12 Perth to Kinfauns (north of A90) |60
awareness of flood risk. 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school/education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Self Help
(80410011) G Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80240018)
A
The area must be covered by a surface water
management plan (SWMP) or plans that set
objectives for the management of surface water
flood risk and identify the most sustainable
actions to achieve the objectives.
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process.
Perth &
Kinross
Council
2018 -
2020
Work on the Perth Surface Water Management
Plan commenced in December 2021. The contract
was awarded to consulting engineers, Amey
Consulting Ltd. 
The development of the Perth Surface Water
Management Plan is on-going and is
programmed for completion in 2023.
Surface
Water
Plan/Study
(80240019)
G
An integrated catchment study covering the Perth
City catchment will be carried out to support the
surface water management planning process in
the Perth surface water management priority
area. The study will improve knowledge and
understanding of the interactions between the
above ground and below ground drainage
network e.g., with the sewer network,
watercourses and (where applicable) the sea.
This will improve the understanding of local
surface water flood risk. The stated timescales
and funding arrangements between Scottish
Water and Perth & Kinross Council will take the
studies though the Scoping and Modelling phases
to define the significant flooding issues in the
catchment. After this has been completed, it is
expected that the integrated catchment study
partnerships will remain in place and will progress
with the Optioneering phase to establish the
preferred solution(s) to the significant flooding
issues.
Scottish
Water in
partnership
with Perth &
Kinross
Council
Perth City
2016 -
2019
The Perth Integrated Catchment Study commenced
in November 2016. The contract was awarded to
consulting engineers, ARC. A catchment flood
assessment identified 32 flooding ‘hotspots’ (areas
of higher flood risk) across the Perth sewer
catchment area. The study was completed in
December 2019.  
No options appraisal was carried out as part of the
study, however further investigations at 5 of the
hotspots in PVA 08/13 were taken forward through
an IFOS (Internal Flooding due to Overloaded
Sewers)(refer to Action ID 80240019 in PVA
08/13). 
The Perth Integrated Catchment Study was
completed in December 2019. This study
provided an improved understanding of the
flooding mechanisms in Perth. 
A further study to consider the other
identified flooding hotspots in Perth has
been included in the Cycle 2 Tay Local
Flood Risk Management Plan. 
Maintenance
(80410007) G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Page 103 of 354

Page 104

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/12 Perth to Kinfauns (north of A90) |61
Planning
Policy
(80010001)
G Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 104 of 354

Page 105

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/13 Perth Centre|62
3.2.13 Perth Centre PVA 08/13 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Perth coastal 
Summary of Progress Within PVA 
There are approximately 320 residential properties and 260 non-residential properties at risk of
flooding. The Annual Average Damages are approximately £1.8 million. Further information can be
found in Tay Local FRM Plan under PVA 08/13. 
This PVA has been exposed to significant weather events including Storms Desmond and Frank in
Dec 2015 and Jan 2016 respectively, with several properties and roads affected. The ‘Beast from
the East’ (March 2018) brought about significant levels of snow fall across the PVA, although a
gradual thaw limited any flooding issues resulting from snowmelt. More recently, Perth was affected
by surface water flooding in August 2020, when approximately 165 properties were affected, and
again in September 2022, when approximately 30 properties were affected.  
Scottish Water and Perth & Kinross Council worked in partnership on the Perth Integrated
Catchment Study (ICS), which was completed in 2019. The optioneering phase (to consider potential
solutions to the identified flooding issues in five high priority areas) is nearing completion.
Perth & Kinross Council have engaged consulting engineers to complete the Craigie Burn flood
study and to develop the Perth Surface Water Management Plan and this work is on-going.  
Perth & Kinross Council has carried out significant maintenance, clearance and repair works on the
Perth Flood Protection Scheme, including works on the North Muirton Flood Embankment in 2019
and 2020. Substantial clearance and repair works were carried out along the Scouring and Craigie
Burns following flooding in August 2020.
Scottish Water has completed assessments of flood risk within the Almondbank and Perth City
sewer catchments.
SEPA have continued to provide a flood forecasting service and operate their existing flood warning
system in this PVA.
The Council coordinates the Perth & Kinross Local Resilience Partnership’s Community and
Business Resilience Group in this PVA. Awareness raising activity has been carried out by the
Council and the Scottish Flood Forum and will continue to be delivered through the projects noted
above. 
No significant changes have taken place within the PVA over the first FRM cycle so far, however
there are a number of developments proposed or taking place around the Perth boundary.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Perth Centre PVA 08/13
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/13  A G   A G  G G G G G  A G G  G G 
Summary of Progress of Actions to Manage Flood Risk in Perth Centre (PVA 08/13)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection A A flood protection study has been recommended
for Perth and will consider flood risk from the
Perth &
Kinross
2016 -
2018
The Craigie Burn flood study commenced on
programme in November 2016 as part of the Perth
Once available, the draft study findings will
be disseminated via local community drop-in
Page 105 of 354

Page 106

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|63
Study
(80290005)
Craigie Burn. The study will assess direct flood
defences and sediment management. The study
should take a catchment approach and consider
the potential benefits and disbenefits and
interaction between actions upstream and
downstream. The study area (primarily Queens
Avenue, Queen Street and Windsor Terrace) falls
within the area of the Perth City integrated
catchment study and surface water management
plan (Action ID’s 80240018 and 80240019). The
study will therefore be integrated with the Perth
integrated catchment study.
Council integrated catchment study (ICS) (Action ID’s
80240018 and 80240019). A hydraulic model of the
Craigie Burn was produced as part of the wider ICS
project.
The remainder of the Craigie Burn Flood Study re-
commenced in November 2021 and is on-going.
The contract was awarded to consulting engineers,
Amey Consulting Ltd.
sessions. The Craigie Burn Flood Study is
programmed for completion in 2023.
Maintain
Flood
Protection
Scheme
(80290017)
G
Continue to maintain the flood protection schemes
that protect Perth against flooding. The schemes
include the Perth Flood Protection Scheme that
was completed 2002, including flood defences on
the Perth Town Lade and Craigie Burn, and the
Almondbank Flood Protection Scheme which is
currently under construction and due to be
completed in 2016.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Perth. Maintenance
works are carried out as required. 
Works have included sediment management works
on the Craigie Burn and clearance works on the
flood storage pond at Broxden in 2017.
A full pseudo-closure of the flood gates on the
Perth Flood Protection Scheme is carried out
annually to test the operation of the scheme and
ensure operatives are fully trained in the event of a
flood. This also serves to highlight any
maintenance issues that may require to be
addressed.
The programme of routine inspections will be
extended to the Almondbank Flood Protection
Scheme in 2019.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be carried out on an
annual basis and following flood events.
Maintain
Flood
Protection
Scheme
(80300017)
G
Continue to maintain the Perth Flood Protection
Scheme. The scheme was completed in 2002 and
includes major flood defence works such as
embankments, walls, sluice gates, ponds and
pumping stations.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Perth. Maintenance
works are carried out as required. Works have
included sediment management works on the
Craigie Burn, works to address surface water
flooding at Perth Harbour, repairs to the South Inch
and Inveralmond pumping stations, repairs to flood
gates, access improvements, trash screen
maintenance and flood storage reservoir
inspections.
A full preudo-closure of the Perth Flood Protection
Scheme is carried out annually to test the operation
of the scheme and ensure operatives are fully
trained in the event of a flood. This also serves to
highlight any maintenance that may be required.
The Council installed a sheet piled cut off wall at
the North Muirton Flood Embankment in 2019 and
2020 to reduce the risk of ground water seepage
during future flood events.
The Council arranged to replace the pumps in the
South Inch pumping station in 2019, and the
remaining pumps on the scheme were replaced
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be carried out on an
anuual basis and following flood events. 
Page 106 of 354

Page 107

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|64
over the last year.
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
River Almond area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability. Where this work coincides with local
authority studies, SEPA will work collaboratively
to ensure consistent modelling approaches are
applied.
SEPA 2017 SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.       
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the
Almondbank and Perth City sewer catchments to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
Perth City
2016 -
2018 
Almond -
bank
2016 -
2018
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019. 
The Scottish Water assessment of flood risk within
the Almondbank sewer catchment was completed
in October 2017. 
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Almondbank and the
Inveralmond Industrial Estate flood warning areas
which are part of the Almond (Perth) river flood
warning scheme. 
Continue to maintain the North Muirton Industrial
Estate and the Basement Properties from North
Inch to Friarton Bridge flood warning areas which
are part of the Tay river flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80290012) G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
Community Ongoing The Perth & Kinross Local Resilience Partnership’s
Community and Business Resilience Group
operates in this area. 
Resources have also been offered by various other
local groups.
The Scottish Flood Forum supported, and
Perth & Kinross Council will continue to
coordinate with the Local Resilience
Partnership’s Community and Business
Resilience Group on a priority needs basis
where resources allow.
The Scottish Flood Forum will engage
Page 107 of 354

Page 108

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|65
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Perth Business Community Resilience Group
operates in this area. Membership of the group
includes Perth & Kinross Council, SEPA, Tayside
Fire and Rescue and the Scottish Flood Forum.
The group aims to reduce flooding to businesses
and communities within Perth city centre, improve
joint working before, during and after flooding and
develop ways of increasing community resilience
against flooding.
continues to engage with, the South Inch Flood
Group after the flooding of August 2020. The
Forum also provided flood recovery services to
people impacted by flooding at this time. This
included several online events organised by Perth
& Kinross Council to support communities.
further with the South Inch Flood Group to
build links, consider a community flood plan
and assess the Forum’s property flood
resilience advice.  
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Awareness raising activity was carried out as part
of the Perth Integrated Catchment Study (Action ID
80240019). Perth & Kinross Council and Scottish
Water have issued a newsletter to residents on
Feus Road, Perth every three months to keep them
informed. Following widespread surface water
flooding in Perth in August 2020, the Council
issued flood bulletins, responded to
correspondence and held a series of online
community meetings to raise awareness of flood
risk. Similar activity was undertaken following the
flooding of September 2022. The Perth IFOS
(Internal Flooding due to Overloaded Sewers)
study findings for the Feus Road area were
disseminated via a local community drop-in session
on 1 November 2022.
The Scottish Flood Forum (SFF) has also engaged
with the local community following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding. The SFF provided flood recovery
services to people impacted by flooding in August
2020. This included several online events
organised by PKC to support communities. 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will carry out further
awareness raising activity in conjunction the
Craigie Burn Flood Protection Study and the
Perth Surface Water Management Plan
(Action ID's 80290005 & 80240018).
The Perth IFOS study is on-going and is
programmed for completion in 2023 (Action
ID 80240019). The study findings for the
Cavendish Avenue area will be disseminated
via local community drop-in sessions in early
2023.
Self Help G Refer to Description in Table 2. N/A Ongoing Further to the self-help actions described in Table 2 Refer to planned actions described in Table
Page 108 of 354

Page 109

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|66
(80410011) of this report, some additional progress has been
made within the Perth Centre PVA.
Following flooding in August 2020, Perth & Kinross
Council’s Housing Service fitted PLP products to
some Council housing in the vicinity of Wallace
Crescent, Perth.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion. More recently, the SFF
has provided independent property flood resilience
advice and carried out 15 PFR assessments to
homes impacted by flooding.
2 of this report.
Surface
Water
Plan/Study
(80240018)
A
The area must be covered by a surface water
management plan (SWMP) or plans that set
objectives for the management of surface water
flood risk and identify the most sustainable
actions to achieve the objectives.
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process.
Perth &
Kinross
Council
2018 -
2020
Work on the Perth Surface Water Management
Plan commenced in December 2021. The contract
was awarded to Amey Consulting Ltd.
The development of the Perth Surface Water
Management Plan is on-going and is
programmed for completion in 2023.
Surface
Water
Plan/Study
(80240019)
G
An integrated catchment study covering the Perth
City catchment will be carried out to support the
surface water management planning process in
the Perth surface water management priority
area. The study will improve knowledge and
understanding of the interactions between the
above ground and below ground drainage
network e.g., with the sewer network,
watercourses and (where applicable) the sea.
This will improve the understanding of local
surface water flood risk.
The stated timescales and funding arrangements
between Scottish Water and Perth & Kinross
Council will take the studies though the Scoping
and Modelling phases to define the significant
flooding issues in the catchment. After this has
been completed, it is expected that the integrated
catchment study partnerships will remain in place
and will progress with the Optioneering phase to
establish the preferred solution(s) to the
significant flooding issues.
Scottish
Water in
partnership
with Perth &
Kinross
Council
Perth City
2016 -
2019
The Perth Integrated Catchment Study commenced
in November 2016. The contract was awarded to
consulting engineers, ARC. A catchment flood
assessment identified 32 flooding ‘hotspots’ (areas
of higher flood risk) across the Perth sewer
catchment area. The study was completed in
December 2019.  
No options appraisal was carried out as part of the
study, however further investigations at 5 of the
hotspots were taken forward through an IFOS
(Internal Flooding due to Overloaded Sewers)
study. The hotspots were located at Feus Road,
Cavendish Avenue, Marshall Place, Bells Sports
Centre and South Street. The Feus Road and
Cavendish Avenue hotspots were investigated
jointly by Scottish Water and Perth & Kinross
Council. The study findings for the Feus Road area
were disseminated via a local community drop-in
session on 1 November 2022.
The IFOS study is currently on-going and is
programmed for completion in 2023. 
The Perth Integrated Catchment Study was
completed in December 2019. This study
provided an improved understanding of the
flooding mechanisms in Perth. 
The IFOS study (and options appraisal) is
on-going and is programmed for completion
in 2023. The study findings for the
Cavendish Avenue area will be disseminated
via local community drop-in sessions in early
2023. Scottish Water will continue with study
work on potential sewer improvements until
summer 2023.
A further study to consider the other
identified flooding hotspots in Perth has
been included in the Cycle 2 Local Flood
Risk Management Plan.
Maintenance
(80410007) G Refer to Description in Table 2. Perth &
Kinross
Ongoing Following extreme flooding in August 2020, Perth &
Kinross Council undertook emergency works within
Refer to planned actions described in Table
2 of this report.
Page 109 of 354

Page 110

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|67
Council,
asset / land
managers
the Craigie Burn catchment. This included
removing debris/blockages, sediment and
vegetation management along the Scouring,
Buckie and Craigie Burns. Further vegetation and
sediment management works were carried out at
Queens Avenue in March 2022. Further clearance
works were undertaken following the flooding in
September 2022.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency plans/ response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2. Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 110 of 354

Page 111

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/14 Comrie|68
3.2.14 Comrie PVA 08/14 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council, Stirling Council River Earn 
Summary of Progress Within PVA 
There are approximately 510 residential properties and 100 non-residential properties at risk of
flooding. The Annual Average Damages are approximately £2.0 million. Further information can be
found in Tay Local FRM Plan under PVA 08/14. 
The PVA has also been exposed to significant weather events including Storms Desmond and Frank
in Dec 2015 and Jan 2016 respectively, and more recently the ‘Beast from the East’ (March 2018)
which brought about significant levels of snow fall across the PVA, although a gradual thaw limited
any flooding issues resulting from snowmelt.
Following on from the feasibility work and public consultation events in late 2016, the Comrie Flood
Protection Scheme was published on 28 February 2020. Following a local hearing, the Scheme was
confirmed on 18 August 2021 and the detailed design is nearing completion. In the meantime,
advance works for the Scheme commenced in late August 2022. 
SEPA have commenced flood mapping improvements in the Upper Earn area. SEPA have also
continued to provide a flood forecasting service and operate their existing flood warning system in
this PVA.
Scottish Water has completed assessments of flood risk within the Comrie and Crieff sewer
catchments.
Awareness raising activity has been carried out by the Council and the Scottish Flood Forum and
has been coordinated with the Comrie Community Resilience Group. This activity will continue to be
delivered through the projects noted above.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Comrie PVA 08/14
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/14 A  G   A G  G G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Comrie (PVA 08/14)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80330006) A
A flood protection scheme is underway for Comrie
to reduce the combined flood risk from the Water
of Ruchill, River Earn and River Lednock. The
proposed scheme consists of flood walls and
embankments. The scheme will provide a 1 in 200
standard of protection plus freeboard.
Perth &
Kinross
Council
2016 -
2020
The Comrie Flood Protection Scheme was
published on 28 February 2020 and, following a
local hearing, was subsequently confirmed without
modification by the Council’s Environment &
Infrastructure Committee on 18 August 2021.
Planning permission was granted on 16 December
2021. The detailed design for the main works is
nearing completion. The advance works for the
Once the detailed design for the Comrie
Flood Protection Scheme is complete, the
main works contract will be tendered and
awarded. The main works are currently
programmed to commence on site in 2023.
Substantial completion of the Scheme is
currently programmed for late 2024. 
Page 111 of 354

Page 112

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|69
scheme were awarded to contractors, Balfour
Beatty, and commenced in late August 2022 and
are on-going. 
The Scottish Flood Forum supported the flood
protection scheme consultation events with the
Council and key agencies.
Flood
Protection
Scheme/
Works
(8303021) 
A
Transport Scotland will carry out civil engineering
work which will reduce the risk of flooding on
identified sections of the trunk road. Transport
Scotland will manage the reduction through the
operation of the trunk road via the routine and
cyclic maintenance programme. Transport
Scotland maintains an on-going review of areas of
known historic flood locations and should areas
such as Comrie be identified as such an area,
Transport Scotland will seek funding in due
course based on a prioritised criteria to support
the routine and cyclic maintenance programme at
these locations.
Transport
Scotland
Ongoing Opportunities to alleviate flooding have been
considered as part of on-going routine and cyclic
maintenance. This included the recent essential
carriageway resurfacing on two sections of the A85
Trunk Road East of Comrie and East of Dunira
Estate (October 2016).
December 2022 - no further update provided by
Transport Scotland.
Transport Scotland flooding workshop
planned for April 2019.
Improvement opportunities will continue to
be sought and included in forthcoming
routine and cyclic maintenance schemes
and programmes.
Research project underway to determine
how the CREW surface water flood
forecasting system could be applied to linear
transport corridors such as the trunk road
network of Scotland.
The flooding database will be reviewed to
assess key locations for improvements.
Detailed schemes will be developed as
required.
December 2022 - no further update provided
by Transport Scotland.
Maintain
Flood
Protection
Scheme
(80330017)
G
Continue to maintain existing flood defences and
flood protection works in Comrie. These include
the Water of Ruchill Flood Protection Scheme
(constructed in the 1960s) and the flood
protection works carried out in 2013.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Comrie. Maintenance
works are carried out as required. 
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. 
Maintain
Flood
Protection
Scheme
(80350017)
G
Continue to maintain the Water of Ruchill Flood
Protection Scheme (constructed in the 1960’s)
and the flood protection works carried out in 2013
that reduce the risk of river flooding to Dalginross.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Dalginross. Maintenance
works are carried out as required.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. 
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
Upper Earn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016-
2017
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.     
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will carry out an assessment of
flood risk within the highest risk sewer catchments
to improve knowledge and understanding of
surface water flood risk. Scottish Water will
undertake further investigation and modelling in
the Comrie and Crieff sewer catchments to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
Comrie
2016 -
2018 
Crieff
2016 -
2017 
The Scottish Water assessment of flood risk within
the Comrie sewer catchment was completed in
May 2018. 
The Scottish Water assessment of flood risk within
the Crieff sewer catchment was completed in
December 2019.
This action is complete. 
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Carse of Lennoch to
Lochlane and the Crieff to Innerpeffray flood
warning areas which are part of the Earn river
flood warning scheme.
Continue to maintain the Comrie flood warning
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Page 112 of 354

Page 113

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|70
area which covers properties at risk of flooding
from the Water of Ruchill and/or the River Earn as
part of the Ruchill river flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80330012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Comrie Resilience Group operates in this area.
The membership includes Perth & Kinross
Council, SEPA, Scottish Fire & Rescue and the
Scottish Flood Forum. The group aims to reduce
flooding of businesses and communities in
Comrie. The resilience group was formed as a
response to severe flooding in Comrie in August
and November 2012.
Community Ongoing The Comrie Community Resilience Group has
developed a Community Resilience Plan and
Emergency Procedures for activation during
flooding events. This will involve supporting
vulnerable residents, deploying sandbags/aqua
sacs from a community store and liaising with the
Emergency Services. 
The Scottish Flood Forum supported the Comrie
Community Resilience Group with their flood plan
but understands they are currently inactive. The
Forum is liaising with Perth & Kinross Council on
potential property flood resilience advice to
properties outwith the Comrie Flood Scheme.  
Perth & Kinross Council will continue to
coordinate with the Comrie Community
Resilience Group on a priority needs basis
where resources allow.  
The Scottish Flood Forum will continue to
liaise with the lead community contact for
Comrie. 
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Perth & Kinross Council has carried out on-going
awareness raising activity during the development
of the proposals for the Comrie Flood Protection
Scheme. Community drop-in sessions were
arranged in Comrie in September 2016 following
the completion of the flood scheme feasibility study.
Further community drop-in sessions were held in
April and May 2019 following the completion of the
scheme outline design. These events were
Further to the awareness raising described
in Table 2 of this report, Perth & Kinross
Council will continue with awareness raising
activities during the continuation of the
Comrie Flood Protection Scheme and any
other relevant actions set out in the Tay
Local Flood Risk Management Plan. 
Page 113 of 354

Page 114

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|71
attended by the Council, SEPA and the Scottish
Flood Forum. 
Two further community drop-in sessions took place
in June 2022 to update the local community about
the scheme detailed design and advance works.
These were attended by representatives from the
project team including Perth and Kinross Council,
SGN, Scottish Water, SSE, Sweco and Balfour
Beatty. 
The Council has maintained its project specific
website and regular newsletters have been issued
to the community to keep them informed about the
progress of the flood scheme. One-to-one meetings
with land and property owners continue. This
activity has been coordinated with the Comrie
Community Council.
The Scottish Flood Forum (SFF) has also engaged
with the local community following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Self Help
(80410011)
G
Refer to Description in Table 2.  - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made within this PVA.
The Council’s Housing Service has fitted flood
protection products to 15 Council properties within
Comrie.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
The SFF have given independent PFR advice to a
few properties in Crieff.
Refer to planned actions described in Table
2 of this report. 
Maintenance
(80410007) G
Refer to Description in Table 2.  Perth &
Kinross and
Stirling
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Page 114 of 354

Page 115

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|72
Council,
asset / land
managers 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 115 of 354

Page 116

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/15 Forteviot|73
3.2.15 Forteviot PVA 08/15 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Earn 
Summary of Progress Within PVA 
There are fewer than 10 residential properties and non-residential properties at risk of flooding in the
Forteviot PVA. The Annual Average Damages are approximately £15,000. Further information can
be found in Tay Local FRM Plan under PVA 08/15. 
There have been no significant weather events in this PVA since the publication of the Tay Local
FRM Plan. Widespread surface water flooding occurred during the storm of August 2020, and
approximately 11 properties were affected in Forgandenny.
SEPA have commenced flood mapping improvements in the Lower Earn area. SEPA have also
continued to provide a flood forecasting service and operate their existing flood warning system in
this PVA. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Forteviot PVA 08/15
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/15      A A  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Forteviot (PVA 08/15)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk. Approximately 900km²
of improved surface water data is currently
available within this Local Plan District. 
SEPA 2016 -
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
across Scotland and represents a significant
change in rainfall amounts compared to FEH99
dataset, as such it is no longer consider
appropriate to deliver this action as originally
intended.  This action will not be taken forwards as
described. A major national update of the surface
water maps is underway which will deliver updated
surface water flooding maps for Scotland
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next
flood risk management cycle. 
Page 116 of 354

Page 117

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/15 Forteviot|74
representing the latest scientific understanding.  
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
Lower Earn area (from Forteviot Bridge to the
River Tay confluence) to improve understanding
of flood risk. The extent and timing of
improvements will depend on detailed scoping
and data availability.
SEPA 2016 -
2018
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time. 
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Innerpeffray to Bridge of
Earn flood warning area which is part of the Earn
river flood warning scheme. When flood events
occur in an area with an existing flood warning
service, SEPA will seek to verify the flood
forecasts and warnings. SEPA will use feedback
and post-event data to ensure that our flood
warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Widespread surface water flooding affected this
area in August 2020, affecting properties in
Forgandenny. The Council issued flood bulletins,
responded to correspondence and held a series of
online community meetings to raise awareness of
flood risk.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007)  G
Refer to Description in Table 2.  Perth &
Kinross
Council,
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Page 117 of 354

Page 118

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/15 Forteviot|75
asset / land
managers 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/ response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 118 of 354

Page 119

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/16 Dunning|76
3.2.16 Dunning PVA 08/16 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Dunning Burn (River Earn) 
Summary of Progress Within PVA 
There are approximately 40 residential properties at risk of flooding in the Dunning PVA. The Annual
Average Damages are approximately £120,000. Further information can be found in Tay Local FRM
Plan under PVA 08/16.
Widespread surface water flooding occurred during the storm of August 2020, and approximately 11
properties were affected in Dunning.
Perth & Kinross Council undertook sediment management works to maintain channel conveyance
along the Dunning Burn in August 2018. Significant clearance works on the Dunning Burn were also
undertaken following the flooding of August 2020.
SEPA have commenced flood mapping improvements in the Middle Earn area. SEPA have also
continued to provide a flood forecasting service and operate their existing flood warning system in
this PVA.
Scottish Water has delivered an assessment of flood risk within the Auchterarder sewer catchment. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Dunning PVA 08/16
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/16      A G  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Dunning (PVA 08/16)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
Middle Earn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016 -
2017
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.   
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will carry out an assessment of
flood risk within the highest risk sewer catchments
to improve knowledge and understanding of
surface water flood risk. Scottish Water will
undertake further investigation and modelling in
the Auchterarder sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Scottish
Water
2016 -
2018
The Scottish water assessment of the Auchterarder
sewer catchment was completed in February 2018.     
This action is complete.
Page 119 of 354

Page 120

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/16 Dunning|77
Risk Management (Scotland) Act 2009.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Innerpeffray to Bridge of
Earn flood warning area which is part of the Earn
river flood warning scheme. When flood events
occur in an area with an existing flood warning
service, SEPA will seek to verify the flood
forecasts and warnings. SEPA will use feedback
and post-event data to ensure that our flood
warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Widespread surface water flooding affected this
area in August 2020, affecting properties in
Dunning. The Council issued flood bulletins,
responded to correspondence and held a series of
online community meetings to raise awareness of
flood risk.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Maintenance
(80410007) 
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
been made within this PVA.
Perth & Kinross Council undertook sediment
management works on the Dunning Burn in August
2018. Following the flooding of August 2020, the
Council completed clearance works to remove
timber debris from the Dunning Burn and the Latch
Burn.
Refer to planned actions described in Table
2 of this report.
Page 120 of 354

Page 121

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/16 Dunning|78
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 121 of 354

Page 122

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/17 Bridge of Earn|79
3.2.17 Bridge of Earn PVA 08/17 
Local Plan District Local authority Main catchment
Tay Fife Council, Perth & Kinross Council River Earn 
Summary of Progress Within PVA 
There are approximately 50 residential properties and 20 non-residential properties at
risk of flooding in the Bridge of Earn PVA. The Annual Average Damages are
approximately £410,000. Further information can be found in Tay Local FRM Plan
under PVA 08/17. 
The PVA has been exposed to significant weather events including Storms Desmond
and Frank in December 2015 and January 2016 respectively, with several properties
and roads affected. In March 2018, the ‘Beast from the East’ brought about significant
levels of snow fall across the PVA, although a gradual thaw limited any flooding issues
resulting from snowmelt. Widespread surface water flooding occurred during the storm
of August 2020 and again in September 2022.
Perth & Kinross Council has continued to maintain the existing flood scheme in Bridge
of Earn and has carried out maintenance as required.
SEPA have commenced flood mapping improvements in the Lower Earn area. SEPA
have also continued to provide a flood forecasting service and operate their existing
flood warning system in this PVA.
Scottish Water have completed an assessment of flood risk in the Perth City sewer
catchment.
Awareness raising activity has been carried out by the Scottish Flood Forum.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Bridge of Earn PVA 08/17
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/17   G   A A G  G G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Bridge of Earn (PVA 08/17)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Maintain
Flood
Protection
Scheme
(80400017)
G
Continue to maintain the existing Bridge of Earn
Flood Protection Scheme on the River Earn, the
Deich Burn and the Yellow Burn. The scheme
was completed in 2006 and includes flood walls
and embankments.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council's Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Bridge of Earn.
Maintenance works are carried out as required.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be carried out on an
annual basis and following flood events.
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk, to be completed early
in the first flood risk management cycle.
Approximately 900km² of improved surface water
SEPA 2016 -
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next
Page 122 of 354

Page 123

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|80
data is currently available within this Local Plan
District. SEPA will seek to develop flood mapping
in the Lower Earn area to improve understanding
of flood risk. The extent and timing of
improvements will depend on detailed scoping
and data availability. 
across Scotland and represents a significant
change in rainfall amounts compared to FEH99
dataset, as such it is no longer consider
appropriate to deliver this action as originally
intended.  This action will not be taken forwards as
described. A major national update of the surface
water maps is underway which will deliver updated
surface water flooding maps for Scotland
representing the latest scientific understanding.  
flood risk management cycle.
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
Lower Earn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016 -
2018
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time. 
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates. 
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Perth
City sewer catchments to improve knowledge and
understanding of flood risk in this area as required
under Section 16 of the Flood Risk Management
(Scotland) Act 2009.
Scottish
Water
2016 -
2018
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019.
This action is complete.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Bridge of Earn and the
Bridge of Earn to the River Tay flood warning
areas which are part of the Earn river flood
warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was
launched in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help
urban areas and the transport network improve
their resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80400012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
Community Ongoing Glenfarg Community Resilience Group has been
established and a review of their emergency plan
is on-going.
Perth & Kinross Council will continue to
coordinate with the Glenfarg Community
Council on a priority needs basis where
resources allow.
Page 123 of 354

Page 124

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|81
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Glenfarg Community Council operates in this
area. The community council have prepared a
community resilience plan to help prepare for and
respond to emergencies..
Awareness
Raising
(80410013)
G
Refer to Description in Table 2. 
From 2016 SEPA will engage with the community
through local participation in national initiatives,
including partnership working with 
Neighbourhood Watch Scotland. In addition,
SEPA will engage with local authorities and
community resilience groups where possible.
Local authorities will be undertaking additional
awareness raising activities. Further details will be
set out in the Local FRM Plan. 
Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Widespread surface water flooding affected this
area in August 2020. The Council issued flood
bulletins, responded to correspondence and held a
series of online community meetings to raise
awareness of flood risk. Following the flooding of
September 2022, the Council liaised with Bridge of
Earn Community Council.
The Scottish Flood Forum (SFF) engaged with the
local community following previous flooding. This
included initial community engagement with both
the Community Council and the wider community,
exploring possible options regarding future SEPA
and Local Authority engagement. The SFF
provided a presentation and appropriate advice to
support the short-term strategic development of
the community to deal with flooding. 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have
been limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011)
G
Refer to Description in Table 2.  N/A Ongoing Further to the self-help actions described in Table
2 of this report, some additional progress has
been made within this PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007)
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
The Council completed works to make safe a
collapsed retaining wall on the Deich Burn in
Bridge of Earn following the flooding of August
2020.
Refer to planned actions described in Table
2 of this report.
Page 124 of 354

Page 125

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|82
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA,
beyond those already described in Table 2 of this
report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Page 125 of 354

Page 126

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3 |83
3.3 Other Actions 
This section sets out details of additional significant actions undertaken in the Tay Local
Plan District by local authorities to contribute to the implementation of the current actions
in the plan and the achievement of the objectives in the plan. 
Perth & Kinross Council have carried out additional actions, outwith the actions identified
within the Tay Local Flood Risk Management Plan.  These actions include: 
• Delivering on previous commitments to complete investigations into flood schemes
(at Comrie, Bankfoot and Coupar Angus) and carrying out the associated public
consultation events in late 2016. This included community drop-in sessions and
presentations to provide these communities with further information on the risk of
flooding; the outcome of the Council’s investigations into flood schemes; work to
raise awareness of flooding and help the community become more resilient to it and
other action being taken on flood risk. The events were also attended by SEPA,
Scottish Water and the Scottish Flood Forum. 
• Riverbank erosion protection works, as well as repairs to a surface water outfall,
have been carried out on the River Almond at Inveralmond, Perth. The works were
completed in December 2017 and have helped to manage the risk of surface water
flooding in the Inveralmond Industrial Estate as well as protecting the integrity of the
existing flood defences in the area. Scottish Water also completed repairs to an
adjacent drainage outfall earlier in 2017.
• Works to address surface water flooding have been carried out at Perth Harbour.
The works have helped to manage the risk of flooding to properties in the harbour
area and were completed in March 2018.
• The completion of flood study work in October 2018 for the small burns to the
southeast of Pitlochry in the vicinity of Middlehaugh of Dalshian, Easthaugh of
Ballyoukan and the Altrory Burn.
• Investigation works were completed on the North Muirton flood embankment. The
Council has installed a sheet piled cut off wall to reduce the risk of ground water
seepage during future flood events. This measure was completed in 2020 to
manage the risk of flooding to adjacent properties while protecting the integrity of
the flood defences in this area. 
• In response to the severe flooding of 11 & 12 August 2020:
o A coordinated response from various Council services and partner
organisations involving investigations, advice and support. 
o Continued work with public agencies and local resilience groups to investigate
and respond to the impact of the flooding, focusing on the homes and
businesses most affected. 
o Responses to over 650 enquiries received via the Council’s dedicated web
page and generic e-mail address.
o Nine online community meetings were held.
o On the ground works in the most affected areas to respond to, and support,
emergency works.
Page 126 of 354

Page 127

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|84
o Emergency clearance works on the Craigie Burn, the Alyth Burn and the
Dunning Burn.
o CCTV camera surveys of drainage systems and culverts
o Works to make safe a collapsed retaining wall on the Deich Burn in Bridge of
Earn.
o A report to the Council’s Environment and Infrastructure Committee on 18
August 2021, including a summary of identified short, medium, and long-term
actions. These actions were consistent with the Tay Local Flood Risk
Management Plan. 
o A review of the Council’s Out of Hours Emergency Service and flood gate
closure procedure.
• In November 2020, Scottish Water and the Council carried out the replacement of
all 8 pumps (4 foul & 4 surface water) in the South Inch Pumping Station, as part of
planned maintenance work. The remaining pumps on the Perth Flood scheme
between Inveralmond and South Inch, have been replaced over the last year. 
Page 127 of 354

Page 128

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  List of Acronyms and Abbreviations |85
List of Acronyms and Abbreviations 
FEH Flood Estimation Handbook
FEP Flood Emergency Plan
FLS Forestry and Land Scotland
FRM  Flood Risk Management 
ICS Integrated Catchment Study 
LFRMP  Local Flood Risk Management Plan 
LPD  Local Plan District 
PLP Property Level Protection
NFM Natural Flood Management 
PVA  Potentially Vulnerable Area 
Q&S  Quality & Standards (Scottish Water) 
RAG Red, Amber, Green 
SEA Strategic Environmental Assessment
SEPA  Scottish Environment Protection Agency 
SFFS Scottish Flood Forecasting Service
SF Scottish Forestry
SPP  Scottish Planning Policy
SR10/15  Spending Review periods for 2010-2015 and 2016-2021 for Scottish
Water capital maintenance expenditure 
SUDS Sustainable Urban Drainage System
SWMP  Surface Water Management Plan
TEAMB Tay Estuary and Montrose Basin 
Page 128 of 354

Page 129

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Annex 1 |86
Annex 1: FRM Responsibilities & Legal Requirement for this Final Report
Flood Risk Management in Scotland
The Scottish Ministers, SEPA and responsible authorities must exercise their flood risk
related functions with a view to reducing overall flood risk (refer to Section 1(1) of the
Flood Risk Management (Scotland) Act 2009). 
Through the preparation of a national flood risk assessment and setting of objectives to
reduce the level of flood risk by SEPA, which is published in the Flood Risk Management
Strategy, and the publication of Local Flood Risk Management Plans by lead local
authorities, which detail how and when the actions agreed to meet these objectives are to
be done, SEPA and all responsible authorities must act to manage flood risk in a
sustainable way. 
Flood Risk Management Strategy for the Tay Local Plan District
Local Flood Risk Management Plan for the Tay Local Plan District
Legal Requirement
This document sets out as assessment of the progress made on implementing the Local
Flood Risk Management Plan (LFRMP) for the Tay Local Plan District (LPD) as required
by Section 38 of the Flood Risk Management (Scotland) Act 2009 (the “Act”). 
38 Local flood risk management plans: final report
(1) Not earlier than 5 years, and not later than 6 years, after a local flood risk management
plan is finalised, or by such other date as the Scottish Ministers may direct, the lead
authority must publish a report on the plan containing — 
(a)  an assessment of the progress made towards implementing the current  
measures, 
(b)  a summary of the current measures which were not implemented, with reasons  
for their non-implementation, and 
(c) a description of any other measures implemented since the plan was finalised  
which the lead authority considers have contributed to the achievement of the  
objectives summarised in the supplementary part of the plan. 
(2) The lead authority must make copies of the report available for public inspection. 
The Tay Local Flood Risk Management Plan, which includes the ‘implementation part of
the Plan’, was published in June 2016. An Interim Report on the progress made on this
Plan was published in March 2019. This Final Report was therefore to be published
between December 2021 and June 2022. However, the Scottish Minister’s subsequently
directed that the Final Report be published by 31 December 2022. 
Page 129 of 354

Page 130

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   Annex 1|87
The Final Report provides a summary of the Tay Local Flood Risk Management Plan
actions (‘measures’) and assessment of the progress made towards implementing them.
The information on progress includes: 
• an assessment of the progress made towards implementing each of the actions.
• reasons for any actions where delivery is not as planned; and
• a summary of the actions which have not been implemented, with reasons why they
were not implemented; and
• a description of arrangements planned to deliver the remaining actions and to address
delayed actions; and
• a description of any other actions implemented since the Plan was finalised. which the
lead authority considers have contributed to the achievement of the objectives
summarised in the Plan. 
The Final Report is published by the lead authority as defined by Section 34(9) of the Act
in partnership with SEPA and the responsible authorities, as defined by Section 5 of the
Act. The approval of the Final Report will be in accordance with the agreed governance
arrangements for the Local Plan District Partnership. The responsible authorities for the
Tay LPD Partnership are: 
• Perth & Kinross Council (lead authority)
• Angus Council
• Fife Council
• Stirling Council
• SEPA
• Scottish Water
• Loch Lomond and the Trossachs National Park
• Cairngorms National Park
• Scottish Forestry 
Publication
The published Final Report for the Tay LFRMP will be made available for public inspection,
as per Section 37(2) of the Act, via the website of the lead authority, Perth & Kinross
Council: 
http://www.pkc.gov.uk/frmplans 
Links to the published Final Report for the Tay Local Flood Risk Management Plan will
also be provided from Scottish Government, SEPA and other responsible authority
websites. 
A hard (paper) copy of the published Interim Report for the Tay LFRMP is also available
for public inspection at the following location(s): 
(1) Pullar House, 35 Kinnoull Street, Perth PH1 5GD
Page 130 of 354

Page 131

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   Annex 1|88
(2) Auchterarder Library, Chapel Wynd, Auchterarder PH3 1BL
(3) Blairgowrie Area Office, 46 Leslie Street, Blairgowrie PH10 6AQ
(4) Crieff Area Office, 32 James Square, Crieff PH7 3EY
(5) Pitlochry Area Offices/Library, 26/28 Atholl Road, Pitlochry PH16 5BX
(6) Breadalbane Community Campus, Crieff Road, Aberfeldy PH15 2DU
(7) Loch Leven Community Campus & Library, The Muirs KY13 8FQ 
during the hours of 8.45 a.m. to 5.00 p.m., Mondays to Fridays inclusive, except 8.45am to
11am on the first Thursday of every month. 
Copies of the published Final Report for the Tay Local Flood Risk Management Plan may
also be available at offices of other responsible authorities. Those persons living in the
Angus, Stirling and Fife Council areas of the Tay District should contact their own local
authority in the first instance: 
Angus Council ACCESS line  03452 777 778
Fife Council General Enquiries  03451 550 000
Stirling Council General Enquiries 01786 404 040 
Page 131 of 354

Page 132

Page 132 of 354

Page 133

Invergowrie (Potentially Vulnerable Area 07/12) 
Local Plan District Local Authority Main Catchment
Tay Estuary and Montrose Basin Angus Council, Dundee City Council, Perth and
Kinross Council Invergowrie Burn
Summary of Progress Within PVA
There are approximately 240 residential properties and 60 non-residential properties at
risk of flooding. The Annual Average Damages are approximately £740,000. Further
information can be found in the Tay Estuary and Montrose Basin (TEAMB) Loc al Flood
Risk Management Plan under PVA 07/12.
Key progress has been m a de with the Dundee Dighty, Monifieth and Sidlaws Flood
Study and the establishment of the surface water management partnership. However,
the majority of the flood risk in the Invergowrie area originates from fluvial sources of
flooding and so this area was not taken forward in the wider surface water
management plan. The Invergowrie Natural Flood Management Study was
completed in 2022. 
The PVA has been exposed to recent signific ant weather events including Storms
Dennis in February 2021.
© Crown copyright. SEPA license number
100016991 (2022). All rights reserved.
Reproduced from Tay Estuary and Montrose Basin Flood Risk
Management Strategy, SEPA (December 2022).
3
Page 133 of 354

Page 134

PVA Flood protections
scheme / works
Natural flood
management works
New
flood warning
Flood protection
study
Natural flood
management study
Surface water plan/
study
Strategic
mapping and
modelling
Maintain flood
protection
scheme*
Maintain flood
warning
Flood
forecasting
Property level
protection scheme
Community flood
action groups
Self help
Awareness
raising
Maintenance
Site protection
plans
Emergency plans/
response
Planning
policies
07/12     G G G   G   G G G  G G 
Summary of Progress of Actions to Manage Flood Risk in Invergowrie (PVA 07 / 12) 
Action Status
(RAG)
Description Delivery
Lead
Planned
Dates
Final Progress Planned Actions to complete
Natural Flood
Management
Study
G Undertake a natural flood
management study to assess
whether river / flood plain
restoration and sediment
management could help reduce
flood risk in Invergowrie. The
study will take a catchment
approach and consider the
potential benefits and disbenefits
and interaction between actions
upstream and downstream
economically, socially and
environmentally.
Angus
Council,
Dundee City
Council, Perth
& Kinross
Council
2016 - 2020 The Invergowrie natural
flood management
study commenced in
March 2020. The
contract was
administered by Perth &
Kinross Council and was
awarded to consulting
engineers, Sweco UK
Ltd. The study was
completed in September
2022.
Perth and Kinross Council
disseminated the study
findings to the local
community in September
2022.
Surface Water
Plan/ Study 
G A surface water management
plan or plans to cover
Dundee, Broughty Ferry,
Invergowrie, Lochee and
Monifieth, which set
objectives for the
management of surface
water flood risk and identify
Angus
Council,
Dundee City
Council,
Perth &
Kinross
Council
2016 - 2019 The SWMP for Invergowrie is
being undertaken as p art of
the Dundee Downfield,
Monifieth and Sidlaws Flood
Protection study which
commenced in June 2018.
The SWMP partnership has
been established and
Angus Council will continue to
work with Dundee City
Council, Scottish Water and
RPS to prepare the surface
water management plans for
this PVA. These plans will
identify joint and / or separate
solutions to surface water
Overview of actions to manage flooding in the Invergowrie PVA
Page 134 of 354

Page 135

the most sustainable actions to
achieve the objectives will be
prepared.
available information
reviewed.
flooding within this PVA.
Once the plans are finalised
the SWMP partners will
support the prioritisation of
solutions and jointly seek
funding. This study is on track
to complete in July 2019. 
The Tayside Integrated
Catchment Study (ICS)
demonstrated that there
was very little interaction
between the Invergowrie
Burn and other sources of
flooding. Perth and Kinross
Council have therefore not
progressed with the ICS
which was originally
intended to support the
surface water management
plan process.
Strategic
Mapping
and
Modelling
G Undertake further investigation
and modelling in the Hatton
sewer catchment to improve
knowledge and
understanding of flood risk in
this area as required und er
Section 16 of the Flood Risk
Management (Scotland) Act
2009.
Scottish Water  Scottish Water have
delivered Section 16
assessment data as
programmed in the Tay
Estuary and Montrose Basin
Local Flood Risk
Management Plan. 
Page 135 of 354

Page 136

Flood
forecasting
(90320009)
G The Scottish Flood Forecasting
Service is a joint initiative
between SEPA and the Met
Office that produces daily,
national flood guidance
statements which are issued
to Category 1 and 2
Responders. The flood
guidance statements provide
an assessment of the risk of
flooding for a five-day period,
allowing responders time to
put preparations in place to
reduce the impact of
flooding. The service also
provides information which
allows SEPA to issue flood
warnings.
SEPA  SEPA has continued to
operate the Scottish Flood
Forecasting Service (SFFS)
Partnership with the Met
Office with daily, national flood
guidance statements issued to
Category 1 and 2 agencies
(such as emergency
responders’ local authorities
and other organisations with
flood management duties).
Each daily statement gives an
assessment of the risk of
flooding for the next five days
to help enable these
organisations to put
preparations in place to
reduce the impact of flooding.
SEPA’s Flood Alert service is
freely available to everyone
and helps enable communities
to be aware and prepared to
reduce the impacts of flooding.
SEPA will continue and
improve the Scottish Flood
Forecasting Service (SFFS)
with the Met Office, with daily
flood guidance statements,
with flood alerts issued as
required to enable
communities and responders
to reduce the impacts of
flooding.
Awareness
Raising
G SEPA and the responsible
authorities have a duty to raise
public awareness of flood risk.
Improved awareness of flood
risk and actions that prepare
individuals, homes and
businesses for flooding can
reduce the overall impact.
Scottish Water will support
SEPA and responsible
authorities with their
awareness raising activities as
Responsible
Authorities
Ongoing SEPA has delivered a
range of awareness raising
activities through
campaigning education
activities and partnership
delivery. We have run
national and loc al digital
and direct engagement
campaigns to raise
awareness of flood risk and
SEPA’s flood warning
service, Flood line. We
SEPA will continue to raise
awareness of flood risk
through campaigning,
developing education and
engagement tools, creating
new partnerships, improving
the flood warning, and
forecasting service. Many of
our awareness raising
activities currently underway
will continue. Our focus will
be on promoting flood
Page 136 of 354

Page 137

required and provide targeted
flooding communications for
Scottish Water specific activities.
Scottish Water will raise
awareness by producing and
supplying targeted information
to the public on large capital
projects and detailed loc al
studies. More general
information and flooding
guidance will be available on
the Scottish Water website
(https://www.scottishwater.co.uk
/you-and-your-home/your-
home/flooding-information).
SEPA will undertake flood risk
education and awareness
raising activities. In addition,
SEPA will engage with the
Council and community
resilience groups and
participate in property level
protection events delivered
by the Scottish Flood Forum
where possible. Across Scotland,
SEPA will create and share
communication and education
resources with other
responsible authorities. These
resources will include
awareness campaigns, media
and marketing activity and
promotion of SEPA's flood
forecasting and warning
services (Floodline). Where they
publish and publicise an
electronic Newsletter
(Flooding Gateway) four
times a year which is
distributed to a wide
audience. We are working
with Education Scotland and
Scottish Government
Resilience team to embed
flooding awareness within
the Curriculum for
Excellence, and resilience
partners in Safer
Communities
programmes. We have
also developed an inline
tool that helps everyone
share information on
current flooding issues
(Report-a-Flood). We have
worked in partnership with
Local Authorities,
emergency services and
community organisations
(e.g., Neighbourhood
Watch Scotland, Citizens
Advice Scotland, and
others) to share our
resources and help to
promote preparedness and
understanding of how we
manage flood risk in
Scotland.
We have actively
supported the Scottish
warning and forecasting
service, innovation,
education and engagement
with partners, customers,
and the public. 
Perth and Kinross Council will
continue with awareness
raising activities when
developing proposals for
any on-going actions in it ’s
local flood risk management
plans.
Page 137 of 354

Page 138

exist, SEPA will engage with
community resilience groups
and community safety
partnerships.
Flood Forum and worked
closely with UK agencies to
develop joint flooding
information. 
Perth and Kinross Council
engaged with the local
community in Invergowrie in
September 2022 to
disseminate the findings of
the Invergowrie Natural
Flood Management Study.
Advice and information on
flood risk management are
also available on the
Council’s website.
Self Help G Everyone is responsible for
protecting themselves and
their property from flooding.
Property and Business owners
can take simple steps to
reduce damage and
disruption to their homes and
businesses should flooding
happen. This includes
preparing a flood action plan
and flood kit, installing
property level protection,
signing up to Floodline and
Resilient Communities
initiatives, and ensuring that
properties and businesses are
insured against flood damage.
Responsible
Authorities
Ongoing Everyone is responsible for
protecting themselves and
their property from
flooding. Property and
Business owners can take
simple steps to reduce
damage and disruption to
their homes and
businesses should flooding
happen. This includes
preparing a flood action
plan and flood kit, installing
property level protection,
signing up to Floodline and
Resilient Communities
initiatives, and ensuring that
properties and businesses
are insured against flood
damage. 
Perth and Kinross Council will
continue to support
communities to become
more resilient to flooding
and to develop community
resilience groups and
emergency plans.
Page 138 of 354

Page 139

Perth and Kinross Council
supports communities to
become more resilient to
emergency situations,
including flood events.
Communities have been
engaged through the multi-
agency local Resilience
Partnership and Community
and Business Resilience
Group led by the Council.
Maintenance G Loc al authorities have a duty
to assess watercourses and
carry out clearance and rep air
works where such works would
substantially reduce flood risk.
They produce schedules of
clearance and rep air works
and make these available for
public inspection. Scottish
Water undertake risk-based
inspection, maintenance, and
repair on the public sewer
network. Asset owners and
riparian landowners are
responsible for the
maintenance and
management of their own
assets including those which
help to reduce flood risk.
Local
authorities,
asset / land
managers
Ongoing Perth and Kinross Council
has continued to inspect
and assess watercourses.
Routine inspections are
carried out either annually,
six monthly or quarterly,
depending on the flood risk
associated with each
watercourse. Further
reactive inspections have
been carried out when
issues have been
highlighted or during times
of flooding. Where a flood
risk is identified, and
clearance and repair works
would reduce that flood
risk, then those works are
included on the Council's
clearance and repair
schedule and carried out.
Perth and Kinross Council
Perth and Kinross Council will
continue to inspect and
assess watercourses and
carry out clearance and
repair works where this would
substantially reduce flood
risk. Road gullies will continue
to be monitored and cleared
as per the gulley monitoring
programme. 
Scottish Water will continue to
undertake risk-based
inspections and
maintenance.
Page 139 of 354

Page 140

also operates a monitoring
programme for the
inspection and
maintenance of road
gullies. Each gulley is
inspected, and cleared if
required, once per year.
The monitoring
programme identifies
gullies that are more at risk
from blockage so that they
can be checked more
frequently. It also enables
the Council to reduce the
frequency of inspections
where gulleys are found to
require less frequent
maintenance. Through this
monitoring, the Council is
developing a more
strategic and sustainable
approach to gully
maintenance. The public
can also contact the
Council to highlight issues
with any road gullies. 
Scottish Water continue to
undertake risk-based
inspections maintenance
and repair on the public
sewer network.
Page 140 of 354

Page 141

Emergency
Plans /
Response
G Providing an emergency
response to flooding is the
responsibility of many
organisations, including loc al
authorities, the emergency
services and SEPA. Effective
management of an
emergency response relies on
emergency plans that are
prepared under the Civil
Contingencies Act 2004 by
Category 1 and 2
Responders. Scottish Water
are a Category 2 responder
under the Civil Contingencies
Act 2004 and will support
regional and local resilience
partnerships as required. The
emergency response by these
organisations is coordinated
through regional and loc al
resilience partnerships. This
response may be supported
by the work of voluntary
organisations.
Category 1
and 2
responders
Ongoing SEPA continues to sup p ort
LAs in-emergency planning
and the process is on-
going in identifying areas
requiring Emergency Plans. 
Perth and Kinross Council
has implemented its
Flooding Emergency
Response Plan. The Plan is
designed to ensure that
contingency measures are
in place for a coordinated
and flexible response to
flooding incidents to
mitigate the effects of
flooding emergencies on
people, property, and
infrastructure.
SEPA to provide a list of
receptors at risk but not
currently considered as a
PVA action (as discussed
during PVA consultation
exercise). LA to discuss with
private owner and / or
Community group about
preparing an Emergency
Plan with assistance
provided by Grampian
Emergency Planning Unit and
the Scottish Flood Forum Fife
Council aims to raise
awareness of flooding
through ongoing community
engagement and working in
partnership with the Scottish
Flood Forum, SEPA and
Scottish Water to share our
resources and help to
promote community
resilience and
understanding of how we
manage flood risk within the
Loc al Authority area and the
loc al plan districts.
Where staffing resources
allow, consideration will be
given to working with schools
through collaboration with
colleagues in Education.
Page 141 of 354

Page 142

Consideration will also be
given to a public
communications campaign to
assist with raising awareness of
flooding. Perth and Kinross
Council will continue to
implement the Flooding
Emergency Response Plan
when required. Where no
incidents have occurred
within a 12-month period a
tabletop exercise will be
conducted to test the
response plan. This exercise
may include consideration of
flooding incidents, severe
weather, widespread
flooding, storm events.
Planning
Policies
G Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land.
In terms of flood risk
management, the policy
supports a catchment- scale
approach to sustainable flood
risk management and aims to
build the resilience of our cities
and towns, encourage
sustainable land management in
our rural areas, and to a d dress
Planning
authority
Ongoing SEPA and Local Authority
Officers have continued
to provide flood risk
information to the local
plan and the
development control
process. The promotion of
sustainable surface water
drainage is in place for all
new developments.
The current Perth & Kinross
Local Development Plan
(LDP2) contains planning
policy and development
This action will continue
key milestones in Perth &
Kinross Council’s LDP3
review will be the policy
and place discussions
which will take place
during 2022/23,
culminating in the
preparation of an
Evidence Report in 2023,
whilst preparation of the
Proposed Plan is
programmed for 2024. To
inform this process, the
Page 142 of 354

Page 143

the long-term vulnerability of
parts of our coasts and islands.
Under this approach, new
development in areas with
medium to high likelihood of
flooding should be avoid ed. For
further information on the
national planning policies see
http:/ / www.sepa.org.uk/
environment/land / planning /. 
SEPA has a statutory role in
relation to the provision of
flood risk advice to planning
authorities. This role is
expressed in Section 72 of the
FRM Act, 2009. SEPA also has
a duty to cooperate with
planning authorities in the
preparation of development
plans. When consulted in
relation to planning
applications for development
or for site allocations in
development plans, or where
the planning authority
considers there may be a risk
of flooding, SEPA will provide
advice. Advice provided by
SEPA will be with respect to
the risk of flooding and based
on the relevant information it
holds which is suitable for
planning purposes. It will also
allocations which ensure that
new development at medium
to high risk of flooding is
avoided (unless flood
protection measures to the
appropriate standard (1:200
years) already exist and are
maintained, are under
construction, or are a planned
measure in a current flood risk
management plan). SEPA and
Perth & Kinross Council’s
flooding team input to the
planning application process
as necessary to implement
flood risk policy and ensure
there is an appropriate
assessment and mitigation of
flood risk as detailed
development proposals come
forward. The Council's
flooding team has reviewed
approximately 1,300 planning
applications since the start of
the 2019/20 financial year as
a consultee in the planning
process. The Council's
flooding team has also
provided additional advice on
flood risk management to the
Planning Authority out with
these formal consultations.
Council is undertaking a
Strategic Environmental
Assessment (SEA) and
will prepare an
Environmental Report to
identify, describe and
evaluate the significant
effects on the
environment. The SEA
includes the consideration
of flood risk in site
assessment and policy
work and will involve
engagement with SEPA
and Perth & Kinross
Council’s flooding team. 
Page 143 of 354

Page 144

be in line with the principles
and duties set out in the FRM
Act. Further information about
how SEPA engage in the
planning system, including
guidance on flood risk and
planning is available on SEPA
website.
Perth & Kinross Council has
started a review of LDP2
(which was adopted in
November 2019) to produce
LDP3. The initial work on the
LDP3 review has been
centred on data gathering
and settlement audit work.
However, the work
conducted since the
adoption of LDP2 has been
focussed on preparing,
consulting on, revising and
adopting the Flood Risk and
Flood Risk Assessment
Supplementary Guidance,
which was adopted in March
2021, and responding to
Scottish Government
consultations on the draft
National Planning
Framework 4 (NPF4), and
Local Development Planning
regulations. The main
updates to the Flood Risk
and Flood Risk Assessment
Supplementary Guidance
related to climate change;
and the requirements for
sustainable urban drainage
systems (SuDS) and the
ongoing maintenance
responsibilities, including
Page 144 of 354

Page 145

information on potential
maintenance agreements
with Scottish Water under
Section 7 of the Sewerage
(Scotland) Act.
Page 145 of 354

Page 146

Page 146 of 354

Page 147

PVA 09/02 Braco|1
3.2.2 Braco PVA 09/02
Local Plan District Local authority Main catchment  
Forth  Perth & Kinross Council River Knaick
Summary of Progress Within PVA
There are approximately 20 residential properties and 10 non-residential properties at risk of flooding.  The
Annual Average Damages are approximately £29,000.”  Further information can be found in the Local Flood
Risk Management Plan under PVA 09/02.
There have been no significant weather events in this PVA since the publication of the Forth Local FRM
Plan.
Key Progress
• Perth and Kinross Council supports communities to become more resilient to flooding. The Council
has developed its website to provide more advice and information on flood risk management. The
Braco and Greenloaning Community Resilience Group has also been established in this area. 
• Perth and Kinross Council has not prioritised any specific measures in this area but will continue with
awareness raising activities when developing any proposals for the remaining actions set out in the
Forth Local Flood Risk Management Plan. The Council will also continue to carry out its other general
actions to manage flood risk, including inspections and any necessary maintenance of the
watercourses in the PVA.
• Following the second national flood risk assessment in late 2018, Braco will no longer be designated
as a PVA in the Cycle 2 Forth Local Flood Risk Management Plan as it has been re-assessed as
having a lower level of flood risk. 
© Crown copyright and database rights 2022 Ordnance Survey 100020780 (Stirling Council). You are not permitted to copy, sub-
licence, distribute or sell any of this data to third parties in any form.
Reproduced from Forth Flood Risk Management Strategy, SEPA (December 2015). 
3
Page 147 of 354

Page 148

PVA 09/02 Braco|2 
Selected Actions in the Braco PVA
PVA 
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling
New
flood
warning
Maintain flood
warning
Flood
forecasting
Community
flood action
groups
Awareness
raising
Self help
Property level
protection
scheme
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
09/02         G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in the Braco PVA
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
forecasting
(90320009)
G
See Decription within Local Plan District-wide
Actions in Table 22
SEPA Ongoing See progress with Local Plan District-wide Actions in
Table 2.
See planned actions in Table 2.
Self help
(90320011) 
G
See Decription within Local Plan District-wide
Actions in Table 22
Individual  Ongoing Perth and Kinross Council supports communities to
become more resilient to emergency situations,
including flood events. Communities have been
engaged through the multi-agency Local Resilience
Partnership Community and Business Resilience
Group, led by the council. 
The Braco and Greenloaning Community Resilience
Group has been established in this area and an
emergency rest centre has been established as part
of the A9 Trunk Road Community Emergency Plan.
Perth and Kinross Council will continue to
support communities to become more
resilient to flooding. 
The council will also continue to support
communities to develop community
resilience groups and emergency plans.
Awareness
raising
(90320013) 
G
SEPA and the responsible authorities have a duty
to raise public awareness of flood risk. Improved
awareness of flood risk, and actions that prepare
individuals, homes and businesses for flooding,
can reduce the overall impact. 
SEPA-led education and awareness raising
events and promotion of Floodline. SEPA
engagement with community resilience groups
and community safety partnerships. SEPA
partnership working with Neighbourhood Watch
Responsible
Authorities 
SEPA
Ongoing 
01/01/20
16-
31/12/20
50
See Progress with Local Plan District-wide Actions.
In Table 2 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities notably in person joint events have been
limited or delayed due to Covid 19.
Perth and Kinross Council will continue with
awareness raising activities when
developing proposals for the remaining
actions in the Forth Local Flood Risk
Management Plan.
Page 148 of 354

Page 149

PVA 09/02 Braco|3
Scotland. Perth and Kinross Council information
dissemination. Perth and Kinross Council
engagement with community and flood groups.
Scottish Water provision of targeted information. 
Maintenance 
(90320007)
G
See Decription within Local Plan District-wide
Actions in Table 22
Perth &
Kinross
Council,
asset / land
managers
Ongoing See Progress with Local Plan District-wide Actions
in Table 2
See planned actions in Table 2.
Emergency
Plans /
Response
(90320014)
G
See Decription within Local Plan District-wide
Actions in Table 22
Category 1
and 2
Responders
Ongoing See Progress with Local Plan District-wide Actions
in Table 2
See planned actions in Table 2.
Planning
Policies
(90010001)
G
See Decription within Local Plan District-wide
Actions in Table 22
Planning
Authority
Ongoing See Progress with Local Plan District -wide Actions
in Table 2
See planned actions in Table 2 
No additional actions have been implemented in this PVA. 
Page 149 of 354

Page 150

PVA 09/12c Blackford|4 
3.2.13 Blackford 09/12c 
Local Plan District Local Authority Main Catchment
Forth  Perth and Kinross Council Allan Water 
Summary of Progress Within PVA 
There are approximately 50 residential properties and 20 non-residential properties at risk of flooding. The
Annual Average Damages are approximately £270,000.  Further information can be found in the Forth Local
Flood Risk Management Plan PVA 9/12c.
Since the publication of the Forth Local FRM Plan, flooding has occurred in this PVA. In February 2020, 2
homes and 1 business flooded. Other recent high flow events occurred in August 2019 and February 2021 
Key progress 
• Has been made in this PVA through the completion of the Blackford Flood Protection Study in November
2021, which recommended a flood protection scheme for the area. 
• Awareness Raising activities were carried out in conjunction with the completion of this study between
September and November 2021.
• Perth and Kinross Council supports communities to become more resilient to flooding. The Council has
developed its website to provide more advice and information on flood risk management. The Blackford
Community Resilience Group has also been established.
• The Council will also continue to carry out its other general actions to manage flood risk, including
inspections and any necessary maintenance of the watercourses in the PVA.T 
© Crown copyright and database rights 2022 Ordnance Survey 100020780 (Stirling Council). You are not permitted to copy,
sub-licence, distribute or sell any of this data to third parties in any form.
Reproduced from Forth Flood Risk Management Strategy, SEPA, December 2015). 
Page 150 of 354

Page 151

PVA 09/12c Blackford|5 
Selected Actions in the Blackford PVA
PVA
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
09/12c  G       G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in the Blackford PVA 09/12c
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Study
(90310005)
G
A flood protection study has been recommended
for Blackford to assess whether flood defences,
modification of conveyance, sediment
management and natural flood management
could reduce flood risk. The study also
investigated the viability of property level
protection. Natural flood management options that
will be considered including runoff control and
sediment management.
Perth &
Kinross
Council
2016 –
2021
The Blackford Flood Study was completed in
November 2021 and recommended a flood scheme
involving diversion channels, flood walls and
natural flood management measures. The
proposed scheme would protect a total of 38
properties, providing a 1 in 200-year standard of
flood protection. The study findings were
disseminated via the Council’s online consultation
hub and an online community meeting between
September and November 2021.  
This action is complete.
The delivery of the recommended flood
scheme is subject to prioritisation and
inclusion in the next Forth Local FRM Plan
and funding being made available. The
scheme may then proceed to outline design,
the statutory process required by the Flood
Act, detailed design, procurement and
construction.T
Flood
forecasting
(90320009)
G
See Description within Local Plan District-wide
Actions in Table 2
SEPA  Ongoing  See Progress with Local Plan District -wide Actions
in Table 2
See Progress with Local Plan District -wide
Actions in Table 2
Self Help
(90320011)
G
See Description within LOCAL PLAN DISTRICT-
wide Actions in Table 2
Individuals  Ongoing  Perth and Kinross Council supports communities to
become more resilient to emergency situations,
including flood events.  Communities have been
engaged through the multi-agency Local Resilience
Partnership Community and Business Resilience
Group, led by the Council. 
The Blackford Community Resilience Group has
been established in this area and the community
hall is now available as an emergency rest centre.
Perth and Kinross Council will continue to
support communities to become more
resilient to flooding. 
The Council will also continue to support
communities to develop community
resilience groups and emergency plans.
Awareness
raising
(90320013)
G
SEPA and the responsible authorities have a duty
to raise public awareness of flood risk. Improved
awareness of flood risk and actions that prepare
individuals, homes and businesses for flooding
can reduce the overall impact.
SEPA-led education and awareness raising
events and promotion of Floodline. SEPA
engagement with community resilience groups
and community safety partnerships. SEPA
partnership working with Neighbourhood Watch
SEPA and
the
responsible
authorities 
SEPA 
Ongoing 
01/01/201
6-
31/12/205
0
See Progress with LOCAL PLAN DISTRICT-wide
Actions in Table 2.
Awareness raising activity was carried out in
conjunction with the Blackford Flood Study (Action
ID 90310005) 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will carry out further
awareness raising activity in conjunction with
any other relevant actions in the Forth Local
FRM Plan.
Blackford has been identified by the SFF as
a potential site for a SFF supported
RiverTrack community flood alerting project
Page 151 of 354

Page 152

PVA 09/12c Blackford|6
Scotland. Perth and Kinross Council and Stirling
Council information dissemination. Perth and
Kinross Council and Stirling Council engagement
with community and flood groups. Scottish Water
provision of targeted information. 
resilience activities when able. Some planned
activities notably in person joint events have been
limited or delayed due to Covid 19.
but further scoping engagement required to
assess feasibility.
Maintenance
(90320007)
G
See Description within Local Plan District-wide
Actions in Table 2
Perth and
Kinross
Council,
Land/Asset
managers 
Ongoing  See Description within Local Plan District-wide
Actions in Table 2
See Description within Local Plan District-
wide Actions in Table 2
Emergency
plans/respo
nse
(90320014)
G
See Decription within Local Plan District-wide
Actions in Table 2
Category 1
and 2
Responders
Ongoing See Decription within Local Plan District-wide
Actions in Table 2
See Decription within Local Plan District-
wide Actions in Table 2
Planning
Policy
(90010001)
G
See Progress within Local Plan District-wide
Actions in Table 2
Planning
Authority
Ongoing See Progress within Local Plan District-wide
Actions in Table 2
See Progress within Local Plan District-wide
Actions in Table 2 
No additional actions have been implemented in this PVA
Page 152 of 354

Page 153

Page 153 of 354

Page 154

Page 154 of 354

Page 155

Kinross, Milnathort, Glenrothes and Kinglassie (Potentially Vulnerable Area 10/04) 
Local Plan District  Local authority  Main catchment 
Forth Estuary Fife Council and Perth & Kinross Council River Leven (Fife) 
Summary of Progress for Kinross, Milnathort, Glenrothes and Kinglassie 
There are approximately 210 residential properties and 150 non-residential properties at risk of
flooding. The Annual Average Damages are approximately £1,200,000. Further information can be
found in LFRMP under PVA 10/04. 
Perth & Kinross Council are progressing the outline design of the South Kinross Flood Protecton
Scheme. Scottish Water have also completed a S16 Assessment of the Kinross sewer network. The
Kinross Flood Resileince Group has also been set up. 
Scottish Water has completed works on the sewer network serving Milnathort. Perth & Kinross
Council have progressed the outline design of the Milnathort Surface Water Flood Protection
Scheme, while taking cognisance of Scottish Water’s work. A draft Surface Water Management Plan
has been developed as part of this work and this - together with the flood scheme - will be subject to
community consultation in early 2023. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. Reproduced
from Forth Estuary Flood Risk Management
Strategy, SEPA (December 2015). 
3
Page 155 of 354

Page 156

Overview of actions to manage flooding in Kinross, Milnathort, Glenrothes and Kinglassie (PVA 10/04) 
PVA  Flood protection
Scheme/W
orks 
Natural flood
management works 
New
flood warning 
Flood protection
study 
Natural flood
management study 
Surface water
plan/study 
Strategic mapping
and modelling 
Maintain flood
protection scheme* 
Maintain flood
warning 
Flood forecasting 
Property level
protection scheme 
Community flood
action groups 
Self help 
Awareness raising 
Maintenance 
Site protection plans 
Emergency
plans/response 
Planning policies 
10/04 A  A G  A G G  G  N/A G G G  G G
Summary of progress of actions to manage flood risk in the Kinross, Milnathort, Glenrothes and Kinglassie (PVA 10/04) 
Action Status
(Red;
Amber;
Green)
Description Delivery
Lead
Planned
Dates
Progress in Delivery,
including key deliverables
and dates
Revised dates and planned
actions to complete /
address delay
Flood
Protection
Scheme /
Works
(100080006)
A A flood protection scheme has been
proposed for Milnathort to address
surface water flooding. The scheme
would consist of pumping stations and
provide a 1 in 100 year (plus climate
change) standard of protection.
Perth &
Kinross
Council
2016-
2019
The outline design of the
Milnathort Surface Water Flood
Protection Scheme
commenced in November
2018. The contract was
awarded to consulting
engineers, Sweco UK Ltd.  The
outline design is currently
nearing completion and will be
subject to community
consultation in early 2023. The
flood scheme will be published
in 2023.  
The flood protection scheme is
currently programmed for
completion in the 2024/25
financial year. 
Page 156 of 354

Page 157

Flood
Protection
Scheme /
Works
(100110006)
A A flood protection scheme has been
proposed for South Kinross to address
flooding from the South Queich, Gelly
Burn and Clash Burn. The scheme
would consist of flood defence walls and
provide a 1 in 200 year (plus climate
change) standard of protection. 
Perth &
Kinross
Council 
2017-
2021
The outline design of the South
Kinross Flood Protection
Scheme commenced in
February 2019. The contract
was awarded to consulting
engineers, RPS Group. The
outline design is currently on-
going and will be subject to
community consultation in
early 2023. The flood scheme
will be published in 2023.  
The flood protection scheme is
currently programmed for
completion in the 2025/26
financial year. 
New Flood
Warning
(100990010)
A The area under consideration includes
properties affected by flooding in Fife
and Perth & Kinross and is likely to
include Kinross.Further feasibility
assessment will be required to assess
delivery potential and the final detail of
communities for which warnings can be
provided will be determined during the
scoping process.
SEPA May 2021 SEPA undertook an initial
feasibility study for Leven and
Glenrothes which concluded a
new flood warning scheme
was not recommended at the
present time due to the
uncertainty in the degree of
flood risk. However this is to be
reviewed further on completion
of the Leven flood study, which
was underway at the time of
the feasibility assessment. This
is to confirm flood risk for
Leven and Glenrothes.
Review Leven and Glenrothes
flood study (when complete)
and update feasibility study if
necessary.
Flood
Protection
Study
(100120005)
G A Study looking at surface water
management in Glenrothes is scheduled
to start in 2017. This study may identify
future study needs that would be taken
forward in the second flood risk
management cycle.
Fife Council  2016-
2020
On track to deliver as
scheduled in the LFRMP.
Flood Study to be completed
during financial year 2022-23.
Further works dependent on
outcomes from Flood Study. 
Surface
Water
Plan/Study
(100040018)
G The Leven and eastern Methil area will
be covered by a surface water
management plan or plans (SWMP) that
set objectives for the management of
Fife Council 2016-
2021
Study planned to start towards
the end of 2019.
Surface Water Management
Plan to be completed wihtin
Cycle 2 
Page 157 of 354

Page 158

surface water flood risk and identify the
most sustainable actions to achieve the
objectives. Scottish Water will provide
local knowledge and understanding of
the sewer network. This includes
Scottish Water corporate data (as
applicable) and, where available,
outputs of Section 16 or integrated
catchment studies, to assist with the
surface water management planning
process.
Surface
Water
Plan/Study
(100040019)
G An integrated catchment study covering
the Leven Valley catchment will be
carried out to improve knowledge and
understanding of the interactions
between the above ground and below
ground drainage network e.g. the sewer
network, watercourses and (where
applicable) the sea.
This will improve the understanding of
local surface water flood risk. The stated
timescales and funding arrangements
between Scottish Water and Fife
Council will take the studies through the
scoping and modelling phases to define
the significant flooding issues in the
catchment. After this has been
completed, it is expected that the
integrated catchment study partnerships
will remain in place and will progress to
develop solutions to the significant
flooding issues.
Scottish
Water in
partnership
with local
authorities
2021 Complete 
Page 158 of 354

Page 159

Surface
Water
Plan/Study
(100080018) 
A Milnathort will be covered by a surface
water management plan that sets
objectives for the management of
surface water flood risk and identify the
most sustainable actions to achieve the
objectives. Perth & Kinross Council had
previously engaged consultants, Atkins,
to produce the Milnathort Surface Water
Investigation study which was
completed in 2011. This study
recommended a surface water flood
protection scheme (involving drainage
measures, underground storage and
pumping stations). The proposed
scheme will provide a 1:100 year
standard of protection against surface
water flooding, and will include an
additional allowance for climate change.
This action will be implemented through
the Milnathort Surface Water Flood
Protection Scheme Action (ID)
100080006. Scottish Water will provide
local knowledge and understanding of
the sewer network. This includes
Scottish Water corporate data (as
applicable) and, where available,
outputs of Section 16 or integrated
catchment studies, to assist with the
surface water management planning
process.
Perth &
Kinross
Council
2016-
2019
The development of the
Milnathort surface water
management plan commence
in November 2018. The
contract was awarded to
consulting engineers, Sweco
UK Ltd.  
This action is being
implemented in conjunction
with the Milnathort Surface
Water Flood Protection
Scheme (Action ID
100080006). 
The draft surface water
management plan will be
subject to community
consultation in eary 2023, prior
to being finalised. 
Surface
Water
Plan/Study
(101030018)
A The Glenrothes and Markinch areas will
be covered by a surface water
management plan or plans (SWMP) that
set objectives for the management of
Fife Council 2016-
2021. 
Surface Water Management
Plan to be completed wihtin
Cycle 2 
Page 159 of 354

Page 160

surface water flood risk and identify the
most sustainable actions to achieve the
objectives. Scottish Water will provide
local knowledge and understanding of
the sewer network. This includes
Scottish Water corporate data (as
applicable) and, where available,
outputs of Section 16 or integrated
catchment studies, to assist with the
surface water management planning
process.
Surface
Water
Plan/Study
(101030019)
G An integrated catchment study covering
the Leven Valley catchment will be
carried out to improve knowledge and
understanding of the interactions
between the above ground and below
ground drainage network e.g. the sewer
network, watercourses and (where
applicable) the sea.
This will improve the understanding of
local surface water flood risk. The stated
timescales and funding arrangements
between Scottish Water and Fife
Council will take the studies through the
Scoping and Modelling phases to define
the significant flooding issues in the
catchment. After this has been
completed, it is expected that the
integrated catchment study partnerships
will remain in place and will progress to
develop solutions to the significant
flooding issues.
Scottish
Water in
partnership
with local
authorities
2018-
2021
Flow Survey complete.
Manhole and ancillary survey
complete. Watercourse
surveys complete.
Historical Verification &
Catchment Flood Assessment
delivery.
Page 160 of 354

Page 161

Strategic
mapping
and
modelling
(100990019)
G Scottish Water will review  the
assessment of flood risk within the
highest risk sewer catchments to
improve knowledge and understanding
of surface water flood risk. Scottish
Water will undertake further
investigation and modelling in the
Kinross, Leven Valley and Milnathort
sewer catchments to improve
knowledge and understanding of flood
risk in this area, as required under S16
of the Flood Risk Management
(Scotland) Act 2009.
Scottish
Water
2021 Complete 
Maintain
Flood
Protection
Scheme
(100100017)
G Perth & Kinross Council continue to
maintain the existing flood protection
schemes along the Back Burn in
Milnathort. These include the Milnathort
Flood Protection Schemes completed in
2006 and 2010.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council carries
out routine inspections of the
existing flood defences in
Milnathort. Maintenance works
are carried out as required.
Routine inspections will
continue to be carried out as
part of the Council's statutory
duties.
Flood
forecasting
(100990009)
G Link to Scottish Flood Forecasting
Service
Refer to Figure 3; page 26
SEPA Ongoing Refer to FINAL progress
described in Figure 3 of this
report.
Refer to the planned actions
described in Figure 3 of this
report.
Community
Flood Action
Groups
(100100012)
N/A A community resilience group operated
in this area and was supported by Perth
& Kinross Council to develop community
resilience plans.  This action has been
included in SEPA’s Flood Risk
Management Strategy however, this
community action group has now
ceased its activities.
Community N/A Previously, there were no
operational community
resilience groups in Milnathort
or Kinross. However the
Kinross Flood Resilience
Group has recently been set
up.
Perth & Kinross Council will
continue to coordinate with the
Kinross Flood Resilience
Group on a priority needs
basis where resources allow.  
Page 161 of 354

Page 162

Self help
(100990011)
G Raising community awareness of self
help measures available to protect
property
Refer to Figure 3; page 26
Community  No additional self help
activities have been carried out
in this PVA, beyond those
already described in Figure 3
of this report.
No planned actions in this
PVA, further to the planned
actions described in Figure 3
of this report.
Awareness
raising
(100990013)
G Raising Community Awareness of flood
risk
Refer to Figure 3; page 29
Responsible
Authorities
Ongoing Further to the awareness
raising actions described in
Figure 3 of this report, Perth &
Kinross Council has carried out
additional awareness raising
activity in Kinross following
recent flooding events and in
conjunction with the South
Kinross Flood Protection
Scheme (Action ID
100110006). This included
community flood bulletins and
an online community meeting.
Further to the planned actions
described in Figure 3 (LPD
wide actions) of this report.
Perth & Kinross Council plan to
carry out awareness raising in
conjunction with the flood
schemes in Milnathort and
South Kinross (Action ID's
100080006 & 100110006).
Maintenance
(100990007)
G Maintenance at locations where flood
risk has been identified
Refer to Figure 3; page 33
Responsible
Authorities
and asset /
land
managers
Ongoing No additional maintenance
activities  been carried out in
this PVA, beyond those
already described in Figure 3
of this report.
No planned actions in this
PVA, further to the planned
actions described in Figure 3
of this report.
Emergency
plans /
response
(100990014)
G Raise awareness of plans and actions in
place for flood incidents
Refer to figure 3; page 37
Category 1
and 2
Responders
Ongoing No additional
emergency/planning respose
activities have  been carried
out in this PVA, beyond those
already described in Figure 3
of this report.
Further to the planned actions
described in Figure 3 of this
report. Fife Council Emergency
Plan will be updated by the
end of financial year 2022-23.
.
Page 162 of 354

Page 163

Fife Council Updated Flood
Emergency Plan published
Nov 2018. 
Planning
Policy
(100010001)
G LPD reflects flood risk
Refer to Figure 3; page 40
Planning
Authority 
Ongoing No additional planning policy
actions have been carried out
in this PVA, beyond those
already described in Figure 3
of this report.
No planned actions in this
PVA, further to the planned
actions described in Figure 3
of this report.
Page 163 of 354

Page 164

Page 164 of 354

Page 165

Summary of Selected Actions Specific to Potentially Vulnerable Areas        Appendix F 
General Actions Specific Actions
Local
Plan
District
PVA OTA Location
Awareness Raising
Data to Support Climate Resilience
Emergency Plans
Flood Forecasting
Flood W
arning Development Framework
Future Flood Risk Management Planning
Guidance Development
Hazard Mapping Updates
Land Use Planning
Maintenance
Natural Flood Management Mapping
National Flood Risk Assessment
National Surface W
ater Mapping
Reservoirs
Scottish Flood Defence Asset Database
Self Help
Adaptation Planning
Community Engagement
Community Resilience Group
Flood Protection Scheme or W
orks
Flood Study
Flood W
arning Maintenance
Maintenance of Existing Flood Scheme
Sewer Flood Risk Assessment
Surface W
ater Management Plan
Tay
Estuary
07/09 235 Invergowrie ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
07/15 - Auchtermuchty ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Tay 08/01 172 Blair Atholl ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/02 254 Pitlochry ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/03 182 Weem ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
183 Aberfeldy ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/04 189 Alyth  ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/05 230 Forfar ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
241 Kirriemuir ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/06 199 Blairgowrie &
Rattray ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/07 214 Coupar Angus ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/08
179 Spittalfield ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
225 Dunkeld &
Birnam ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
273 Dalguise ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/09 194 Bankfoot ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/10 247 Luncarty ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/11 255 Scone ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/12
187 Almondbank ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
249 Methven ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
253 Perth ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/13 213 Comrie ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/14 205 Bridge of Earn ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Forth 09/03 198 Blackford ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Forth
Estuary 10/03 239 Kinross ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
303 Milnathort ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
3
Page 165 of 354

Page 166

Page 166 of 354

Page 167

Flood Risk Management
(Scotland) Act 2009: 
Local Flood Risk Management Plan
Tay Local Plan District 
Cycle 2: 2022 - 2028 
Published by: Perth & Kinross Council
21 December 2022
3
Page 167 of 354

Page 168

Page 168 of 354

Page 169

Delivering sustainable flood risk
management is important for
Scotland’s continued economic
success and well-being. It is
essential that we avoid and
reduce the risk of flooding, and
prepare and protect ourselves
and our communities.
This is second local flood risk management plan for
the Tay Local Plan District, describing the actions
which will make a real difference to managing the
risk of flooding and recovering from any future flood
events. 
The task now for us – local authorities, Scottish
Water, SEPA, the Scottish Government and all other
responsible authorities and public bodies – is to turn
our local flood risk management plan into action.
Page 169 of 354

Page 170

Foreword
The impacts of flooding experienced by individuals, communities and businesses
can be devastating and long lasting. It is vital that we continue to reduce the risk of
any such future events and improve Scotland’s ability to manage and recover from
any events which do occur. 
The publication of this Plan is an important milestone in implementing the Flood Risk
Management (Scotland) Act 2009 and improving how we cope with and manage
floods in the Tay local plan district.  The Plan translates this legislation into actions to
reduce the damage and distress caused by flooding over the second planning cycle
from 2022 to 2028. 
The Tay local plan district is led by Perth & Kinross Council who have published this
Plan on behalf of a partnership comprising Angus Council, Fife Council, Stirling
Council, SEPA, Scottish Water, Scottish Forestry, Forestry and Land Scotland, Loch
Lomond & Trossachs National Park Authority and Cairngorms National Park
Authority. 
In summary, there are 14 areas that have been identified as being potentially
vulnerable to flood risk across the Tay local plan district. It is estimated there are
around 9,000 homes and businesses at risk from flooding, and this may increase to
13,000 homes and businesses by the 2080s due to climate change. The estimated
annual average damage of these flood risks is £11.4 million. 
This Plan presents actions to avoid and reduce the risk of flooding, and prepare and
protect ourselves and our communities within these potentially vulnerable areas and
across the local plan district. These actions include 6 flood protection schemes or
works; 9 flood studies and 5 surface water management plans. The delivery of many
of these actions may be dependent on the availability of funding; however, we can all
play our part in managing flood risk as we are able. 
Individuals are the first line of defence against flooding and have responsibilities to
protect themselves from flooding.  The publication of this Plan shows that the
coordinated and collaborative efforts of public bodies can be brought together to
deliver sustainable outcomes. However, the actions in this Plan can only be
delivered with the support of all the public bodies, the Scottish Government and,
most importantly, you and your communities. 
This Plan therefore provides the blueprint upon which SEPA, local authorities and
Scottish Water and any other responsible authorities will deliver their flood risk
management responsibilities and, in particular, that all steps should be taken to
manage flooding in a sustainable manner.
Page 170 of 354

Page 171

We would like to thank all those who contributed to the development of this Plan
which will help shape the way in which floods and their impacts are managed across
the Tay local plan district. 
Contributors 
Perth and Kinross Council
Angus Council
Fife Council
Stirling Council
SEPA
Scottish Water
Loch Lomond and the Trossachs National Park
Cairngorms National Park Authority
Scottish Forestry
Forestry and Land Scotland 
Page 171 of 354

Page 172

Contents 
Foreword .......................................................................................................................... 3
Contributors ...................................................................................................................... 4
Contents ........................................................................................................................... 5
List of Acronyms and Abbreviations .................................................................................. 7
Chapter 1. What is a Local Flood Risk Management Plan? ............................................... 8
1.1 How to Read This Plan ........................................................................................... 9
1.2 Progress in Cycle 1 (2016-2022) ............................................................................. 9
1.3 How have we developed the Local Flood Risk Management Plan? ...................... 10
1.4 Roles and Responsibilities for Flood Risk Management Planning ......................... 10
1.5 Consultation, Engagement and Advice ................................................................. 13
1.6 Identification of Objectives, Appraisal and Prioritisation of Actions ........................ 13
1.7 Strategic Environmental Assessment and Habitats Regulations  Appraisal ........... 14
1.8 Links with other Plans, Policies, Strategies and Legislative  Requirements ........... 15
1.9 Next Steps and Monitoring Progress ..................................................................... 17
1.10 Licensing Acknowledgements ............................................................................... 17
Chapter 2. Managing Flood Risk in the Tay Local Plan District........................................ 18
2.1 Understanding of Flooding Within the Tay Local Plan District ............................... 18
2.2 Background Summary of Flooding in the Tay Local Plan District .......................... 18
2.3 Summary of Objectives and Actions Across the Tay Local Plan District ................ 20
2.4 Potentially Vulnerable Areas (PVAs) ..................................................................... 32
Chapter 3. Potentially Vulnerable Areas (PVAs) .............................................................. 36
3.1 List of Potentially Vulnerable Areas (PVAs)........................................................... 37
3.1 Blair Atholl - PVA 02/08/01 .................................................................................... 38
3.2 Pitlochry - PVA 02/08/02 ....................................................................................... 42
3.3 Aberfeldy and Weem - PVA 02/08/03 ................................................................... 47
3.4 Alyth - PVA 02/08/04 ............................................................................................. 54
3.5 Kirriemuir & Forfar - PVA 02/08/05 ........................................................................ 58
3.6 Blairgowrie & Rattray - PVA 02/08/06 ................................................................... 65
3.7 Coupar Angus - PVA 02/08/07 .............................................................................. 69
3.8 Dunkeld & Birnam - PVA 02/08/08 ........................................................................ 73
3.9 Bankfoot - PVA 02/08/09....................................................................................... 82
3.10 Luncarty - PVA 02/08/010 ..................................................................................... 85
3.11 Scone - PVA 02/08/11 .......................................................................................... 89
3.12 Perth & Almondbank - PVA 02/08/12 .................................................................... 94
Page 172 of 354

Page 173

3.13 Comrie - PVA 02/08/13 ....................................................................................... 106
3.14 Bridge of Earn - PVA 02/08/14 ............................................................................ 112
3.15 Other Flood Risk Activities by Local Authorities in the Tay Local Plan District ..... 117
3.16 Next Steps and Monitoring Progress ................................................................... 118
Annex 1: Tay LPD Roles, Responsibilities & Contact Details ........................................ 119
Annex 2: Consultation and Engagement ....................................................................... 124
Annex 3: Land Use Planning ........................................................................................ 139
Annex 4: Strategic Environmental Assessment & Habitats Regulations Appraisal ........ 142
Annex 5: Links to Other Plans, Policies, Strategies and Legislative Requirements ....... 144
Annex 6: Supporting information................................................................................... 148
Annex 7: Glossary ........................................................................................................ 152
Annex 8: Licencing & Acknowledgements .................................................................... 167 
Page 173 of 354

Page 174

List of Acronyms and Abbreviations
AOB  - Area of Benefit
CNPA - Cairngorms National Park Authority
CoSLA - Convention of Scottish Local Authorities
FLS  - Forestry and Land Scotland
ICS  - Integrated Catchment Study
LFRMP  - Local Flood Risk Management Plan
LLTNPA  - Loch Lomond and Trossachs National Park Authority
LPD  - Local Plan District
PVA  - Potentially Vulnerable Area
PVAc  - Candidate Potentially Vulnerable Area
Q&S - Quality & Standards (Scottish Water)
RAs - Responsible Authorities (Local Authorities, Scottish Water, National
Park Authorities and Forestry and Land Scotland)
SEPA  - Scottish Environment Protection Agency
SW  - Scottish Water 
Page 174 of 354

Page 175

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 | 8 
Chapter.1 What is a Local Flood Risk Management Plan? 
This Local Flood Risk Management Plan (the ‘Plan’) has been developed to detail
the actions adopted to reduce the devastating and costly impact of flooding in the
Tay Local Plan District. The Plan supplements the Tay Flood Risk Management Plan
for the Tay Local Plan District developed by SEPA in consultation with local
authorities, Scottish Water, the National Park Authorities and transport and utility
companies. The Flood Risk Management Plans were developed to coordinate the
efforts of all organisations that tackle flooding from all sources and in both urban and
rural areas. They set the objectives to tackle flooding and identify actions to deliver
these objectives. Objectives and actions have been set and agreed by all
responsible authorities and programmed over six-year planning cycles.  The Flood
Risk Management Plans set out the short to long term ambition for flood risk
management in Scotland, identifying where the risk of flooding and the benefits of
investment are greatest.  They are also important in our response to the climate
emergency as flooding is increasing due to climate change. 
The Local Flood Risk Management Plan takes the actions contained in the Flood
Risk Management Plan and adds details as to who will be responsible for
implementing actions, a timetable of when actions will be delivered and a description
of the coordination and funding arrangements (for detail see Chapter 3). The Local
Plan covers the second six-year implementation cycle from 2022 to 2028. 
By publishing the Local Flood Risk Management Plan, individuals and local
communities are provided with information that allows them to better manage their
own responsibilities. Everyone can take action with the confidence of what others are
doing and with the clear knowledge of when they are undertaking these actions.  It is
through this risk-based and plan-led approach that flood management will improve
for the individuals, communities and businesses at risk in the Tay Local Plan District. 
The contents of the Local Flood Risk Management Plan have been agreed by the
lead authority, all responsible authorities and SEPA. 
The Plan is published by Perth & Kinross Council as the lead authority for the Tay
Local Plan District. It has been prepared in collaboration with Stirling Council, Angus
Council, Fife Council, SEPA, Scottish Water, Loch Lomond and the Trossachs
National Park Authority, Cairngorms National Park Authority, Scottish Forestry,
Forestry and Land Scotland and other organisations with a responsibility or interest
in managing flooding. The Plan is a statutory requirement of the Flood Risk
Management (Scotland) Act 2009. 
Page 175 of 354

Page 176

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 9 
1.1 How to Read This Plan 
This Local Flood Risk Management Plan has been developed in three sections:
• Chapter one explains what the flood risk management plan is, how it has
been developed and the obligations different partners have to fulfil duties
under the Flood Risk Management (Scotland) Act 2009;
• Chapter two provides a summary of flood risk in the Tay Local Plan District
and an overview of the objectives and actions that have been selected to
manage that risk across the district and within the Potentially Vulnerable
Areas;
• Chapter three looks at the detail of the objectives and actions set within each
Potentially Vulnerable Area for the second flood risk management cycle from
2022 – 2028, along with historical flooding information.
The annexes to this Plan provide supporting documents and references, and present
more detailed information in various formats. A glossary of the terms used within this
document is also available.
This Plan should be read alongside the Flood Risk Management Plan for the Tay
Local Plan District. The Flood Risk Management Plan has been developed by SEPA
in parallel with this Plan and provides additional background information and national
context. The Flood Risk Management Plans were approved by Scottish Ministers
and published in December 2021. Both this Local Plan and the Flood Risk
Management Plan will be updated every six years.
1.2 Progress in Cycle 1 (2016-2022) 
The 2016 local flood risk management plan outlined the long-term objectives to
tackle flooding in the areas at highest risk within the Tay Local Plan District.
The objectives for each area were agreed and actions were developed to meet those
objectives. Actions to reduce flood risk included developing flood studies and flood
protection schemes and providing public flood warnings and alerts. Actions to avoid
flooding included maintenance of flood defences and storage areas and producing
strong planning policies, which prevent development from taking place in flood risk
areas. 
In 2019, Perth and Kinross Council published the interim report for the Tay Local
Plan District. This report gave the status of each action at that time and reported
them as red, amber or green:
• Green – Action has been delivered and/or is on programme and within
budget;
Page 176 of 354

Page 177

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 10 
• Amber – Action is behind programme and/or over budget, but the key dates
are still anticipated to be met;
• Red – Action is behind programme and/or over budget, with key dates unlikely
to be met and/or outputs unlikely to achieve what was anticipated by the Local
Flood Risk Management Plan.
Actions with a green or amber status can be expected to succeed in working towards
their objectives. The final report was published December 2022.  The interim and
final reports can be viewed at www.pkc.gov.uk/frmplans. 
1.3 How have we developed the Local Flood Risk Management Plan? 
Many organisations and individuals have been involved in helping to improve flood
risk management in Scotland and to provide a more holistic approach than was
previously undertaken. It is recognised that a piecemeal or reactive approach to
tackling flooding does not work. Working jointly to overcome administrative,
institutional, and geographical boundaries is essential to deliver effective flood risk
management.
The Local Flood Risk Management Plan has been developed in close partnership
between all responsible authorities, SEPA and Scottish Water. In local partnerships,
here and throughout Scotland, SEPA has provided the technical analysis and the
evidence to ensure that a nationally consistent approach is taken. Local authorities,
Scottish Water and the National Park Authorities have made sure that local
knowledge and expertise has informed the decision-making. The Tay Local Plan has
been developed in partnership by:
• Perth & Kinross Council (lead authority)
• Angus Council
• Fife Council 
• Stirling Council
• SEPA
• Scottish Water
• Loch Lomond and the Trossachs National Park Authority
• Cairngorms National Park Authority
• Scottish Forestry
• Forestry and Land Scotland 
1.4 Roles and Responsibilities for Flood Risk Management Planning 
Individuals are the first line of defence against flooding and have responsibilities to
protect themselves from flooding. Being prepared by knowing what to do and who to
Page 177 of 354

Page 178

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 11 
contact if flooding happens can help you reduce the damage and disruption flooding
can have on your life. There are steps you can take now to be flood prepared and
reduce the damage and disruption flooding can have on your life.
• View SEPA’s flood maps to check if your area is affected by flooding
https://map.sepa.org.uk/floodmaps
• Sign up to Floodline to receive messages when flooding is forecast in your
area https://www.floodlinescotland.org.uk/
• Know who to contact if flooding happens
https://www.sepa.org.uk/media/28952/who_to_contact_2014.pdf
The Scottish Government oversees the implementation of the Flood Risk
Management (Scotland) Act 2009, which requires the production of flood risk
management plans and local flood risk management plans. Scottish Ministers are
responsible for setting the policy framework for how organisations collectively
manage flooding in Scotland.
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk
management authority. SEPA has a statutory duty to produce Scotland's Flood Risk
Management Plans. SEPA works closely with other organisations responsible for
managing flood risk through a network of partnerships and stakeholder groups to
ensure that a nationally consistent approach to flood risk management is adopted.
SEPA also has a responsibility to identify where in Scotland there is the potential for
natural flood management techniques to be introduced. 
In running Floodline, SEPA provides direct warnings, live flooding information and
advice on how to prepare for or cope with the impacts of flooding 24 hours a day,
seven days a week. To help forecast for flooding SEPA works in partnership with the
Met Office through the Scottish Flood Forecasting Service. SEPA has piloted surface
water flood forecasting to help urban areas improve their resilience to, and
preparedness for, flooding. The development and wider roll-out of this service is
being considered alongside the technical, resource and communication challenges
associated with providing surface water flooding guidance.
To raise awareness of flooding at a national level SEPA runs education initiatives,
community engagement programmes and an annual campaign to promote the useful
advice and information available through Floodline. SEPA works in partnership with
local authorities, Neighbourhood Watch Scotland, Ready Scotland and others to
share our resources and help to promote preparedness and understanding of how
flood risk is managed.
Local authorities work together for flood risk management planning purposes
through a single lead authority which has the responsibility to produce a Local Flood
Risk Management Plan. Local authorities have been working collaboratively to
develop these. It is the responsibility of your local authority to implement its flood
protection actions agreed within the Plan whether that is new engineering projects,
Page 178 of 354

Page 179

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 12 
raising awareness of flooding or clearance and repair activities on the watercourses
the Council manages. During severe flooding, local authorities will work with the
emergency services and coordinate shelter for people evacuated from their homes.
Scottish Water is a responsible authority for flood risk management and is working
closely with SEPA, local authorities and others to coordinate plans to manage flood
risk. Scottish Water has the public drainage duty and is responsible for foul drainage
and the drainage of rainwater run-off from roofs and any paved ground surface from
the boundary of properties. Additionally, Scottish Water helps to protect homes from
flooding caused by sewers either overflowing or becoming blocked. Scottish Water is
not responsible for private pipework or guttering within the property boundary
Loch Lomond and the Trossachs National Park Authority (LLTNPA) is a
responsible authority for flood risk management, is a land manager and is the
planning authority for the area of the Tay catchment within the National Park
boundary. Local Authorities and the LLTNPA will work closely to ensure any actions
that may affect the park are approved and undertaken in such a way that is sensitive
to the conservation areas and in keeping with the National Parks environmental
policies.
Cairngorms National Park Authority (CNPA) is a responsible authority for flood
risk management, is a land manager and is the planning authority for the area of the
Tay catchment within the National Park boundary. Local Authorities and the CNPA
will work closely to ensure any actions that may affect the park are approved and
undertaken in such a way that is sensitive to the conservation areas and in keeping
with the National Parks environmental policies.
Scottish Forestry and Forestry and Land Scotland took over the roles of Forestry
Commission Scotland in 2018 when the Forestry and Land Management (Scotland)
Act 2018 came into force. While these executive agencies of Scottish Government
are not formally designated as a responsible authority under the Flood Risk
Management (Scotland) Act 2009, they support Scottish Government in delivering its
flood risk related duties. This includes engaging in the development of the flood risk
management plans through national and local advisory groups, Local Plan District
partnerships, and collaborative projects. This reflects the widely held view that
forestry can play a significant role in managing flooding.
The Met Office provides a wide range of forecasts and weather warnings. SEPA
and the Met Office work together through the Scottish Flood Forecasting Service,
combining SEPA’s hydrological expertise with the Met Office’s meteorological data to
predict the likelihood and timing of river, coastal and surface water flooding.
The emergency services provide emergency relief when flooding occurs and can
coordinate evacuations. You should call the emergency services on 999 if you are
concerned about your safety or the safety of others and act immediately on any
advice provided.
Page 179 of 354

Page 180

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 13 
The Scottish Flood Forum aims to reduce the impacts of flooding by providing
immediate support and by establishing a network of community resilience groups in
flood risk areas, to equip communities to cope with flooding.
Further details on some of these key roles are outlined in Annex 1. 
1.5 Consultation, Engagement and Advice 
Local authorities and SEPA were keen to hear from the people and communities that
live under the threat of flooding, to ensure that our technical analysis of the risks is
accurate and that efforts to manage flooding are targeted to where most can be
achieved. Two statutory public consultations were held during the development of
the Flood Risk Management Strategies and Plans. The first consultation, held in
2018 and led by SEPA, was on the general approach to flood risk management
planning and the identification of priority areas. The second, held in 2021, was a joint
SEPA and lead authority consultation on the draft Flood Risk Management
Strategies and implementation plans. The views and representations of the
respondents to this second consultation were taken into account in developing and
finalising this Local Flood Risk Management Plan. 
In addition to input from the public consultations, advice has been sought from
relevant organisations at key stages. Some of the work carried out has been
complex and technical in nature for which professional advice was sought. Working
together, SEPA, the Scottish Government, local authorities, Scottish Water, Scottish
Forestry, Forestry and Land Scotland, the National Park Authorities and other key
interested organisations have assisted each other and developed industry best
practice guidance for flood risk management planning. 
Further detail on consultation and engagement can be found within Annex 2. 
1.6 Identification of Objectives, Appraisal and Prioritisation of Actions 
The identification of objectives and selection of actions was led by SEPA as part of
the Flood Risk Management Plan with input from local authorities and Scottish
Water. 
Working collaboratively with local partnerships, SEPA has agreed the objectives for
addressing the main flooding impacts. Actions that could deliver these agreed
objectives have been selected to ensure the right combinations are identified and
prioritised. The actions considered in the development of the Flood Risk
Management Plan include structural actions (such as building floodwalls, restoring
flood plains, or clearance and repair works to rivers) and non-structural actions (such
Page 180 of 354

Page 181

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 14 
as flood warning, land use planning or improving our emergency response).
Structural and non-structural actions are used together to manage flood risk
effectively. 
Natural flood management can provide opportunities for using the land to slow down
and store water. Natural flood management actions will be considered further as part
of any individual flood studies.   
The lists of actions to meet agreed goals and objectives in the second six-year cycle
considered what would be achievable assuming a similar level of funding for flood
risk management activities from the Scottish Government. However, given the timing
of spending reviews and annualised financial settlements for local government, the
actual ability to deliver all the actions set out in the Flood Risk Management Plans in
December 2021 and detailed in this Plan will be dependent on the availability of the
necessary funding in each year of the six-year Plan.
The distribution of Scottish Government grant funding for actions in the plan for the
period 2022 – 2028 is currently being considered by a flood risk management
working group. This group will put forward options and recommendations to the
Scottish Ministers and COSLA, through the Settlement and Distribution Group, for
consideration. A decision will not be made in time for the publication of this Plan. As
such it should be noted that it may not be possible for all actions identified in the
Plan to be grant funded. Inclusion of an action in this plan does not formally commit
a Council to implement it, if reasons arise which make any actions undeliverable,
including inability to secure adequate funding. 
This Plan remains the best understanding of the objectives and actions required over
the long term to manage flood risk in the identified high risk areas within this LPD.
The delivery of the Plan, particularly the ambitions on how quickly actions can be
delivered, may have to be adapted to reflect wider developments in public funding,
the ability of responsible authorities to access funding from other sources, pandemic
recovery, and other national priorities. 
1.7 Strategic Environmental Assessment and Habitats Regulations 
Appraisal 
A Strategic Environmental Assessment (SEA) and Habitats Regulations appraisal
have been undertaken for the Flood Risk Management Plan document that has
informed this Plan. As this Local Flood Risk Management Plan is considered to be
consistent with the Flood Risk Management Plan, no further SEA assessment has
been undertaken. In order to confirm this was appropriate, Perth and Kinross Council
submitted a SEA screening report to the SEA Gateway. The screening responses
received via the SEA Gateway confirmed that he above approach was acceptable.
Further impact assessments will be undertaken on any specific projects as required.
Page 181 of 354

Page 182

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 15 
As the lead authority for the Tay District and a competent authority, Perth and
Kinross Council also undertook a Habitats Regulations Appraisal to ensure that the
Tay Local Flood Risk Management Plan will not adversely affect the integrity of
Special Areas of Conservation and Special Protection Areas. NatureScot were
consulted on the appraisal and their views have been taken into account. Mitigation
has been applied where required to ensure that this Local Flood Risk Management
Plan will not adversely affect the integrity of Special Areas of Conservation and
Special Protection Areas.
Further details are available in Annex 4. 
1.8 Links with other Plans, Policies, Strategies and Legislative 
Requirements 
This Plan does not stand in isolation. As far as is practicable, an integrated approach
to land and water management has been pursued. When developing the Flood Risk
Management Plan and the Local Flood Risk Management Plan, early links were
made with other relevant aspects of water and land management including local
development plans, river basin management plans and emergency plans. In turn, the
responsible authorities will work proactively to ensure the findings from these flood
risk management plans and strategies will influence other planning initiatives in an
interactive and iterative cycle. Making these links has helped identify opportunities to
deliver multiple benefits from flood risk management goals, objectives and actions.
River basin management planning 
Reducing flood risk in Scotland through the development of Flood Risk Management
Plans has provided an opportunity to connect with plans to improve the quality of
Scotland’s water environment. For example, coordination between river basin
management and flood risk management can reduce flood risk, whilst improving
water quality and biodiversity. 
SEPA is coordinating the delivery of River Basin Management Plans and Flood Risk
Management Plans, and local authorities for Local Flood Risk Management Plans,
and they have worked to ensure that there is integration and coordination between
them. This coordination, particularly in regard to consultation and engagement but
also in delivering environmental improvements, will be important for stakeholders
many of whom have an interest in both sets of plans 
Land Use and Spatial Planning 
Land use planning decisions are pivotal to achieving sustainable flood risk
management. Flood risk management can have significant implications for the
location of development and similarly the location of development can have an
Page 182 of 354

Page 183

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 16 
impact on flood risk. Actions that deliver national land use planning policies are
summarised in Annex 3. 
Perth and Kinross Council develops and adopts a new Local Development Plan
every five years.  It sets out the Council’s strategy for delivering appropriate
development in Perth and Kinross, considering a number of potential constraints,
including flooding. The current plan (LDP2) was adopted in November 2019. Work
has started on the review of LDP2 in order to produce LDP3. The initial work on the
LDP3 review has been centred on data gathering and settlement audit work. Key
milestones in the LDP3 review will be the policy and place discussions which will
take place during 2023/24, culminating in the preparation of an Evidence Report in
2024, whilst preparation of the Proposed Plan is programmed for 2024/25. 
Emergency Planning and Response
Emergency planning and response is undertaken by Category 1 and 2 responders
including Police Scotland, the Scottish Fire and Rescue Service, the Scottish
Ambulance Service, both local authorities, the NHS, the Met Office and SEPA.
Emergency plans are prepared under the Civil Contingencies Act 2004. 
Perth and Kinross Council has produced its Flooding Emergency Response Plan,
which is designed to ensure that contingency measures are in place for a
coordinated and flexible response to flooding incidents to mitigate the effects of
flooding emergencies on people, property and infrastructure. Other local authorities
have similar arrangements in place.
Scottish Water Investment Plans 
There is a close relationship between flood risk management plans and Scottish
Water’s 25-year strategic plan. Sewer flooding is not considered in detail in the flood
risk management plans as it remains a high priority for Scottish Water and its
customers. Scottish Water’s close involvement in flood risk management planning
aims to ensure that there is strong coordination between the management of sewer
flooding and wider surface water flood risk, and the actions to be taken forward by
local authorities and others.
Surface Water Management Plans 
Surface water flooding occurs when rainwater does not drain away via normal
drainage systems or soak into the ground but lies on of flows over the ground
instead. This form of flooding is experienced in areas of the Tay Local Plan District.
This will be addressed by Surface Water Management Planning, which is a key
component of the flood risk assessment that has led to the development of this Plan.
Further details of this work can be found in Annex 5. 
Page 183 of 354

Page 184

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 17 
1.9 Next Steps and Monitoring Progress 
This Plan runs from December 2022 until June 2028. Over this period the Tay LPD
Partnership will continue to liaise periodically to monitor progress towards
implementing the actions detailed in Chapter 3 of the Plan. 
Between June 2024 and 2025, Perth & Kinross Council, as lead authority will publish
an interim report on the progress towards implementing the actions identified in the
local flood risk management plan.  This mid-term report will be made publicly
available.  
Between June 2027 and 2028, Perth & Kinross Council, as lead authority will publish
a final report on the progress towards implementing the actions contained in the local
flood risk management plan. This final report will also be made publicly available.
A third set of Flood Risk Management Plans and Local Flood Risk Management
Plans will be published in December 2027 and June 2028 respectively.   
1.10 Licensing Acknowledgements 
Full licensing acknowledgements can be found in Annex 8 of this Plan.
Page 184 of 354

Page 185

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 18 
Return to Contents Page
2. Managing Flood Risk in the Tay Local Plan District 
2.1 Understanding of Flooding Within the Tay Local Plan District 
This chapter presents a background summary of flooding in the Tay Local Plan
District. This summary includes the characteristics and impacts of flooding from river,
coastal and surface water sources in the Tay Local Plan District. A summary of the
objectives and planned actions to manage flooding from these mechanisms across
the whole local plan district and within each of the 14 Potentially Vulnerable Areas
(PVAs) is also provided. 
2.2 Background Summary of Flooding in the Tay Local Plan District 
The Tay Local Plan District covers around 6,100km2 and has a population of
approximately 160,000. It spans from the southern part of the Cairngorms National
Park all the way to the Firth of Tay. The Local Plan District includes a 74km stretch
of the inner Firth of Tay coastline, where the River Tay and the River Earn meet. It
includes the urban areas of Aberfeldy, Alyth Blairgowrie, Comrie, Dunkeld, Forfar,
Perth and Pitlochry.
There are urban and agricultural areas to the east and more rural, mountainous and
forested areas to the west. There are many large lochs and reservoirs, including
Loch Ericht, Loch Rannoch and Loch Tay. The main rivers are the Earn and Tay and
the catchements are shown in Figure 1 below. The River Tay is Scotland’s longest
river at 190km, and its main tributaries include the River Garry, River Tummel, River
Lyon, River Braan, River Isla and River Almond. Many of the lochs and rivers in the
Tay catchment are managed to produce hydropower.
The Tay Local Plan District includes a 74km stretch of the inner Firth of Tay, where
the River Tay and the River Earn meet the Firth of Tay.
There is a river, surface water and coastal flood risk. A number of large floods have
affected this Local Plan District. Recently, intense rainfall in August 2020 and in
September 2022 caused extensive surface water flooding in Perth and many other
towns. Further extensive surface water floods were recorded in July 2015 following
intense rainfall. Storms Desmond and Frank in December 2015 caused river
flooding, affecting many areas within the Local Plan District. Extensive flooding in the
early 1990s, notably in 1993, resulted in the construction of the Perth Flood
Protection Scheme. Other formal flood protection schemes have been constructed
within the Local Plan District including in Almondbank, Bridge of Earn, Comrie,
Kirriemuir, and Weem.
Page 185 of 354

Page 186

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 19 
Return to Contents Page 
Figure 1: River catchments within the Tay LPD
(Reproduced from the Tay Flood Risk Management Strategy, SEPA, December 2015) 
Flood maps are required by the Flood Risk Management (Scotland) Act to show
information that describes the nature of a flood in terms of the source, extent, water
level or depth and, where appropriate, velocity of water. River, coastal and surface
water flood maps were developed by SEPA using a consistent methodology to
produce outputs for the whole of Scotland. This was supplemented with more
detailed, local assessments where available and suitable for use. 
In developing the flood maps SEPA have: 
• Used the most up to date modelling techniques; 
• Used industry endorsed methods; 
• Been able to show more information than ever before on the sources and
impacts of flooding; 
• Developed the first national natural flood management maps showing the areas
where natural techniques to help reduce flood risk could be most effective. 
In developing the maps SEPA worked in partnership with local authorities. They also
worked with the industry to define the overall approach to flood hazard mapping and
undertook a series of internal checks and local authority reviews of outputs.  Further
information on Flood Hazard and Risk including mapping can be found at:
Page 186 of 354

Page 187

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 20 
Return to Contents Page
http://www.sepa.org.uk/environment/water/flooding/flood-maps/
Flood hazard and risk maps are referred to collectively as flood maps and are
available on the SEPA website here:
http://www.sepa.org.uk/environment/water/flooding/flood-maps/
Currently it is estimated that there are around 13,000 people and 9,000 homes and
businesses at risk from flooding in the Tay Local Plan District. This may increase to
21,000 people and 13,000 homes and businesses by 2080s due to climate change.
The expected annual cost of flooding over a long period of time is around £11.4
million.
SEPA lead development of the flood risk management plans for Scotland and
delivery of flood warning services. Local flood risk management planning in the Tay
Local Plan District is led by Perth and Kinross Council, as the lead local authority.
Other responsible authorities include three more local authorities, Scottish Water,
Loch Lomond and the Trossachs National Park Authority and Cairngorm National
Park Authority. They are supported by Scottish Government agencies including
Forestry and Land Scotland, Scottish Forestry and Transport Scotland.
Within this Local Plan District, actions are regularly carried out by SEPA and
responsible authorities to help prepare communities for potential flooding and reduce
the impact of any flooding that does occur. 
2.3 Summary of Objectives and Actions Across the Tay Local Plan District 
The identified objectives are the shared aims for managing flood risk and have been
set out in the Tay flood risk management plan which can be viewed in the Tay Flood
Risk Management Plan. The associated actions describe where and how that flood
risk will be managed. The objectives and actions have been developed by SEPA in
consultation with responsible authorities to manage flooding within the Tay Local
Plan District.
Some flood risk management actions apply to all areas and locations (whether
designated as a Potentially Vulnerable Area or not). For example, flood risk can be
managed through national planning policy or as part of ongoing statutory duties for
local authorities.
The general actions that apply across the Tay Local Plan District are set out in the
tables below. These actions are consistent with the Flood Risk Management Plan.
The tables provide further information about who will be responsible for the delivery
and implementation of the actions, a timetable of when the actions will be
undertaken and the coordination and funding arrangements for those actions. 
Page 187 of 354

Page 188

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 21 
Return to Contents Page 
Action:  AWARENESS RAISING
Delivery lead: SEPA and responsible authorities
Status:  Existing Planned Delivery Period: On-going
Description:
SEPA, the responsible authorities and other organisations such
as the Scottish Flood Forum work together through national and
local initiatives to help communities understand the risk of
flooding and what actions individuals can take. Improved
awareness of flood risk and actions that prepare individuals,
homes and businesses for flooding can reduce the overall
impact of flooding. 
Local authorities undertake additional awareness raising
activities when developing any specific project proposals and will
engage with community resilience groups and local
communities. 
The Scottish Flood Forum supports flood risk communities by
raising community awareness, promoting self-help, developing
community groups and establish a recovery support programme
after a flood.
Coordination
Arrangement:
Delivery of actions to raise awareness will be coordinated by
SEPA and the responsible authorities through the Local Plan
District Partnership. SEPA and the Responsible Authorities will
use any studies, projects and flood schemes to engage with
communities and raise awareness of flood risk. Communications
activity will be coordinated through existing arrangements within
Local Plan District Partnerships. Information will be disseminated
through website, social media and other community engagement
activity. SEPA and responsible authorities will coordinate
awareness raising activities with other related actions.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Awareness raising activities will be funded from local authority
revenue budgets.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure.
The National Park Authorities also have a duty to raise
awareness of flood risk but do not receive any Scottish
Government funding to support any flood specific activities. 
Action (ID):  DATA TO SUPPORT CLIMATE RESILIENCE
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going
Page 188 of 354

Page 189

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 22 
Return to Contents Page
Description:
As Scotland’s hydrometric authority, SEPA operates a network
of stations to measure river level, flow, rainfall, sea level, loch
and groundwater level. The data goes into a long term data
archive and is critical to underpin all flood risk management
activities including flood warning, flood mapping, design of flood
protection and sustainable development as well as supporting a
range of regulatory and recreational uses. 
SEPA will continue to maintain and develop its hydrometric
network, contribute to UK and international data archives, and
improve and update the datasets used for flood frequency
analysis. 
SEPA will support research and development of data, methods
and guidance to improve the evidence on which decisions can
be made, and to enable the impact of climate change to be
included in all flood risk management activities.yy
Coordination
Arrangement:
SEPA will coordinate with a range of other parties as required to
deliver better and more accessible data, and ongoing
improvements to the use of the data to underpin flood risk
management activities and decisions.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  EMERGENCY PLANS / RESPONSE
Delivery lead: Category 1 and 2 Responders 
Status:  Existing Planned Delivery Period: On-going
Description:
Many organisations, including local authorities, the emergency
services and SEPA provide an emergency response to flooding.
Emergency plans are prepared and maintained under the Civil
Contingencies Act 2004 by Category 1 and 2 Responders and
are coordinated through regional and local resilience
partnerships, often supported by voluntary organisations. They
set out the steps to be taken to maximise safety and minimise
impacts during flooding. Emergency plans may also be prepared
by individuals, businesses, organisations or communities.
Scottish Water is a Category 2 responder under the Civil
Contingencies Act 2004 and will support regional and local
resilience partnerships as required.
Coordination
Arrangement:
Perth and Kinross Council has developed a Generic Emergency
Plan and a Flooding Emergency Response Plan. The Plan is
designed to ensure that contingency measures are in place for
the coordinated and flexible response to flooding incidents to
mitigate the effects of flooding emergencies.
SEPA flood alerts and warnings will be monitored and resources
made ready as required. A coordinated response will follow any
reports of flooding.
Emergency response is coordinated with regional and local
resilience partnerships. This response may be supported by the
Page 189 of 354

Page 190

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 23 
Return to Contents Page
work of voluntary organisations. A debrief and plan review will be
carried out following any flood events.
Protecting property from flooding is the responsibility of the
owner of the property, but local authorities can sometimes
provide sandbags to properties. Unfortunately Councils only
have the resources to supply sandbags to residents where there
is an imminent risk of flooding.
Emergency plans/response activities will be coordinated with
other related actions.
Funding
Arrangement:
Funding is allocated to category 1 and 2 responders by the
Scottish Government for dealing with emergency response and
in extreme cases may reimburse responders after an extreme
event. Scottish Water is funded by customer charges as set by
their economic regulator. All business activities required under
this action by Scottish Water are accounted for in their capital or
operational expenditure. SEPA’s role in this action is funded by
Scottish Government through SEPA’s grant in aid settlement. 
Action (ID):  FLOOD FORECASTING 
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going
Description:
The Scottish Flood Forecasting Service is a partnership between
SEPA and the Met Office. The service continues to produce a
daily, national flood guidance statement, issued to emergency
responders, local authorities, and other organisations with flood
risk management duties. As the flood warning authority for
Scotland SEPA continues to provide its flood warning service
issuing flood alerts and warnings when required, giving people a
better chance of reducing the impact of flooding on their home or
business.
Coordination
Arrangement:
SEPA work in partnership with the Met Office and will work
closely with all other authorities involved in emergency response
to flooding.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  FLOOD WARNING DEVELOPMENT FRAMEWORK
Delivery lead: SEPA
Status:  New Planned Delivery Period: On-going
Description:
SEPA will publish a new flood warning development framework
by March 2022, which will detail its ambitions and strategic
actions to maintain and improve our flood warning service across
Scotland. SEPA will continue to develop the Scottish Flood
Forecast, a 3 day forecast of flood risk across Scotland and
bring together all live information such as flood warnings, river
levels and rainfall data into a central hub easily accessible for
the public. Working in close partnership with the Met Office
Page 190 of 354

Page 191

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 24 
Return to Contents Page
through the Scottish Flood Forecasting Service, SEPA will
develop its capability in surface water flooding forecasting,
focusing initially on the transport sector to support climate-ready
infrastructure. SEPA will also undertake a prioritised
improvement programme of existing river and coastal flood
warning schemes to provide more accurate forecast with
improved lead time.
Coordination
Arrangement:
SEPA work in partnership with the Met Office. Appropriate
engagement with the other authorities involved in emergency
response will happen as the flood warning developments are
progressed.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  FUTURE FLOOD RISK MANAGEMENT PLANNING
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period:
On-going;
Flooding services
strategy 2023; 
Next flood risk
management plans
2027
Description:
The years covered by the lifetime of this plan are crucial. Radical
progress is needed in how we reduce our impact on the climate
and respond to the effects of climate change. How we plan to
manage flooding to our communities is on the front line of the
challenges of this decade. The 2027 flood risk management
plans will be more ambitious than ever before. The plans will
look to develop long term plans for more flood resilient
communities prepared for the impacts of climate change. 
The priority areas which will be the focus points of the next flood
risk management plans will be identified in 2024 with the
designation of PVAs. A 3-month public consultation will be held
to inform the PVA designation. 
We will plan for a better future by publishing our flooding
services strategy in 2023 with a clear and measurable delivery
plan. We will put greener, fairer communities at the heart of our
ambitions. 
SEPA has set its own target to be a regenerative organisation by
2030 and the next set of plans will further this ambition.  
During this plan cycle, SEPA will work to develop new
partnerships with a wider range of stakeholders, including
businesses and commercial sectors. We will investigate
alternative sources of finance to tackle flooding and drive
forward practical options for adaptation. 
Coordination
Arrangement:
SEPA will lead the work, in partnership with the Scottish
Government and other responsible authorities. A wider range of
partners and stakeholders will be developed to support the
Page 191 of 354

Page 192

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 25 
Return to Contents Page
action. SEPA will carry out a full consultation on the next draft
flood risk management plans in 2026.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  GUIDANCE DEVELOPMENT
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period:
Draft flood studies
guidance (SEPA)
2023; 
Options appraisal &
Adaptation guidance
(Scottish Govt &
SEPA) 2023; 
Other guidance &
updates 2023-2028
Description:
The Scottish Government and SEPA will develop and update
guidance to inform flood risk management projects. This
guidance will be produced in 2022 and will look at how best to
adapt to the long-term impacts of climate change and the most
appropriate methods of assessing the benefits of flood risk
management actions. 
Technical guidance to support flood risk management partners
will be reviewed and updated by SEPA where required. 
Scottish Forestry, in collaboration with its UK counterparts, will
produce guidance on designing and managing forests to reduce
flood risk. 
Guidance will be developed to help local authorities understand
the requirements for mapping relevant bodies of water and
sustainable urban drainage systems in their areas.
Coordination
Arrangement:
The Scottish Government, SEPA and Scottish Forestry all have
lead roles in delivering the new or updated guidance outlined. A
range of forums will be used to help coordinate and develop the
guidance with the appropriate input from others, including SAIFF
(The Scottish Advisory Implementation Forum for Flooding) and
cross-party working groups.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  HAZARD MAPPING UPDATES
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going
Description:
An understanding of flooding is essential to develop a plan led
risk-based approach to flood risk management. SEPA will
continue to update their national hazard mapping, which shows
the likelihood of flooding in Scotland from different flooding
Page 192 of 354

Page 193

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 26 
Return to Contents Page
sources:
https://www.sepa.org.uk/environment/water/flooding/flood-maps/.
SEPA will continue to develop the hazard mapping viewer to
make it easier for the public, partners and stakeholders to
access data on the likelihood of flooding. SEPA will also review
how modelling and mapping updates are undertaken to develop
a more effective method of regional and national updates for the
hazard maps.
Coordination
Arrangement:
SEPA will work with other relevant parties - including authorities
who have ownership of  data used in flood mapping - to develop
the quality and accessibility of flood hazard mapping.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  LAND USE PLANNING
Delivery lead: Planning authority
Status:  Existing Planned Delivery Period: On-going
Description:
Local authorities, SEPA and Scottish Water all have a
responsibility under the Flood Risk Management (Scotland) Act
2009 to support sustainable flood risk management through the
land use planning process. National planning policies set out the
Scottish Ministers’ priorities for the development and use of land.
Under this approach, new development in areas with medium to
high likelihood of flooding should generally be avoided. Current
national planning policies aim to restrict development within the
floodplain and limit exposure of new receptors to flood risk,
promote flood reduction via natural and structural flood
management measures and restoration of natural features, and
avoid increased surface water flooding through sustainable
drainage and the minimisation of impermeable surfaces. Locally
determined planning policies may place further requirements
within their area of operation to restrict inappropriate
development and prevent unacceptable risk.
Coordination
Arrangement:
Planning authorities coordinate their work with the strategic
development planning authority and the National Parks
Authorities, who are also planning authorities.
SEPA, Scottish Water and local authority flooding teams are
consulted on planning applications and coordinate with the
Planning authorities to ensure that flood risk is addressed. Local
Development Plans provides the framework against which
planning applications outside the National Parks are assessed
and are consistent with the Strategic Development Plans.
SEPA deliver statutory advice on flooding on both planning
applications and Local Development Plans and will continue to
work with the other responsible authorities to support the land
use planning process.
Perth and Kinross Council’s Flooding Team are consulted on
planning applications and work with the Planning and
Page 193 of 354

Page 194

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 27 
Return to Contents Page
Development Service to ensure that flood risk is addressed. The
Perth & Kinross Local Development Plan (LDP2) provides the
framework against which planning applications outside the
National Parks are assessed and is consistent with the Strategic
Development Plan (TAYplan). Supplementary Guidance on
Flood Risk and Flood Risk Assessments is also available to
support the content of the Perth & Kinross Local Development
Plan. 
Planning applications within the National Parks are assessed
against their respective Local Development Plans, which also
contain policies in relation to flood risk. 
Planning applications are also reviewed against SEPA’s
indicative flood maps, existing flood studies and records of
flooding. Where flood risk is an issue, developers are required to
prepare and submit a site-specific flood risk assessment and
drainage impact assessment as applicable. They must also
consider how a development site will be drained and how
surface water runoff will be managed through the implementation
of appropriate Sustainable Urban Drainage Measures. So as to
align the flood risk management and land use planning systems,
land use planning objectives and actions have been developed
which can be viewed in Annex 3.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. Local authority planning
activities are subject to funding from Council revenue budgets.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. Planning activities are funded from the
National Park’s revenue budget which is a combination of
Scottish Government direct grant and planning fees. 
Action (ID):  MAINTENANCE
Delivery lead: Local authority, Scottish Water, asset / land managers
Status:  Existing Planned Delivery Period: On-going
Description:
Local authorities have a duty to assess bodies of water and to
carry out clearance and repair works where such works would
substantially reduce flood risk. Local authorities are also
responsible for the drainage of roads. In addition, local
authorities may also be responsible for maintenance of any
existing flood protection schemes or works. 
Scottish Water will continue to undertake risk-based inspection,
maintenance and repair on the public sewer network. 
Asset owners and riparian landowners are responsible for the
maintenance and management of their own assets including
those which help to reduce flood risk.
Coordination
Arrangement:
Local authorities prepare maps of relevant bodies of water and
sustainable urban drainage systems (SUDS) and carry out
Page 194 of 354

Page 195

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 28 
Return to Contents Page
routine, scheduled inspections of bodies of water on their lists at
a frequency which depends on flood risk. Local authorities
assess flood risk on bodies of water from time to time and
prepare a schedule of clearance and repair works where such
works would substantially reduce flood risk. The schedule is
available for public inspection and local authorities have a duty
to carry out any clearance and repair works described therein. 
Further reactive inspections are carried out when issues are
highlighted or during times of flooding. Further bodies of water
will be included where it has been identified that they may give
rise to a risk of flooding. 
Any identified clearance and repair works from these inspections
are logged in a database and are undertaken in order of priority,
subject to available funding. 
Asset owners and riparian landowners are responsible for the
maintenance and management of their own assets including
those which help to reduce flood risk. In the first instance,
clearance and repair works are therefore referred to the
landowner, where they can be identified. Local authorities
usually only carry out works where there has been a failure of
the landowner to act, where landownership is not clear, or where
urgent intervention is required.
Local authorities will liaise with SEPA where controlled activities
may be required and with private landowners where they may
require to take access on private land or to notify landowners
that they require to undertake maintenance.
Funding
Arrangement:
Maintenance activities are subject to funding from the relevant
local authority revenue budget. 
Scottish Water is funded by customer charges as set by their
economic regulator. All business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID):  NATURAL FLOOD MANAGEMENT MAPPING
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: 2025
Description:
SEPA will continue to support activities that improve our
understanding of how to effectively target and deliver natural
flood management. As part of this, SEPA will review and update
the opportunities mapping for natural flood management. This
will include linking blue-green infrastructure with the surrounding
natural catchment and coastline. Natural flood management
seeks to store or slow down flood waters through measures such
as the planting of woodlands, wetland creation, river restoration,
or the creation of intertidal habitats. In addition to flooding
benefits, natural flood management measures can also provide
many additional benefits to biodiversity, water quality, recreation,
and carbon storage.
Page 195 of 354

Page 196

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 29 
Return to Contents Page
Coordination
Arrangement:
SEPA will work with key stakeholders to review and update the
opportunities mapping.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  NATIONAL FLOOD RISK ASSESSMENT
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going
Description:
SEPA will use the most suitable data to review and update the
national flood risk assessment (NFRA) undertaken in 2018. This
update will be used to identify future potentially vulnerable areas
and focus flood risk management planning. 
Coordination
Arrangement:
SEPA will work with others as the NFRA is updated, including to
keep other responsible authorities informed through the Local
Plan District Partnerships.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  NATIONAL SURFACE WATER MAPPING
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: 2024
Description:
The national flood risk assessment 2018 identified that surface
water flooding has the potential to impact more properties in
Scotland than any other source of flooding. Over the next 6 year
cycle SEPA will look to vastly improve its national understanding
of surface flood risk by undertaking a wholescale update of the
national surface water maps to reflect developments in data and
understanding, including the impact of climate change.
Coordination
Arrangement:
SEPA is currently working with a contractor to develop the
modelling needed to deliver the flood maps. As the mapping is
developed, local authorities and Scottish Water will continue to
be engaged in opportunities to verify, shape and understand the
new mapping products.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  RESERVOIRS
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period:
On-going; 
(Flood warning
developments
2022-2024)
Description:
SEPA will continue to develop its assessment of flood risk from
dam failure and use these assessments to direct a proportionate
regulatory approach to ensure reservoir safety.  Over the next
management cycle we will implement further developments of
Page 196 of 354

Page 197

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 30 
Return to Contents Page
our flood warning capabilities in the unlikely event of reservoir
failure.
Coordination
Arrangement:
SEPA will work with others as required, to deliver the regulatory
duties and to develop flood warning capabilities. Others will
include reservoir managers and operators, and Civil
Contingencies Act responders who share duties for emergency
response.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  SCOTTISH FLOOD DEFENCE ASSET DATABASE
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period: On-going
Description:
The Scottish Flood Defence Asset Database provides
information on existing flood protection schemes. National data
on flood protection infrastructure is needed to understand flood
risk and to develop adaptation planning for Scotland. SEPA will
continue to host SFDAD and look for opportunities to support
the development of our understanding of how and when
Scotland’s flood defence assets should be adapted to continue
to maintain protection from flooding in the future.
Coordination
Arrangement:
SEPA will work with the local authorities to ensure accurate data
on existing and new schemes is made available for the Scottish
Flood Defence Asset Database.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  SELF HELP (80410011)
Delivery lead: -
Status:  Existing Planned Delivery
Period: On-going
Description:
Everyone is responsible for protecting themselves and their
property from flooding. People can take steps to reduce damage
and disruption to their homes and businesses should flooding
happen. This includes preparing a flood plan and flood kit,
installing property flood resilience measures, signing up to
Floodline, engaging with their local flood group, and ensuring
that properties and businesses are insured against flood
damage. The following places offer help with taking steps to
protect yourself: 
https://www.floodre.co.uk/ 
https://www.biba.org.uk/current-issues/flood-insurance/
https://floodlinescotland.org.uk/ 
https://scottishfloodforum.org/
Responsible authorities and SEPA will continue to develop the
understanding of flood risk to communities and promote
Page 197 of 354

Page 198

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 31 
Return to Contents Page
measures to help individuals and businesses to reduce their
risk.
Coordination
Arrangement:
SEPA and Responsible Authorities have a duty to raise public
awareness of flood risk. Helping individuals understand the risks
from which they are most vulnerable from is the first step in the
process.
SEPA and Responsible Authorities will continue to actively
promote Floodline; provide communities with advice to help
them prepare for flooding and to install property flood products;
and will support community resilience groups to developing their
emergency plans.
Work by SEPA and the responsible authorities to develop
understanding and help communities reduce their risk will be
coordinated through the Local Plan District Partnership.
Funding
Arrangement:
Individuals have prime responsibility for protecting themselves
and their property from flooding and are therefore expected to
meet the costs of protecting themselves. 
Page 198 of 354

Page 199

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 32 
Return to Contents Page
2.4 Potentially Vulnerable Areas (PVAs) 
Potentially Vulnerable Areas (PVAs) were designated in 2018 based on the potential
current or future risk from all sources of flooding. This designation was informed by
the second national flood risk assessment, which can be viewed at:
https://www.sepa.org.uk/data-visualisation/nfra2018/)
As part of continued analysis of flood risk, the national flood risk assessment and
Potentially Vulnerable Areas (PVAs) will be reviewed every 6 years to take on board
any new information. Following the second national flood risk assessment, a small
number of Potentially Vulnerable Areas were identified as having a lower flood risk
than first thought. In light of this new information, those PVAs only have general
objectives and actions and no specific objectives or actions have been set. 
There are now 14 Potentially Vulnerable Areas (PVAs) in this Local Plan District, as
shown in Figure 2 below.
The main focus of this Local Flood Risk Management Plan is to manage flood risk in
these Potentially Vulnerable Areas where specific objectives and actions apply, in
addition to the general actions listed in 2.3 above. These specific actions are
required to manage a particular source of potential flooding. Table 3 therefore
provides a summary of where specific actions will be undertaken during the second
flood risk management planning cycle (2022-2028). Further detail on the specific
objectives and actions relating to each individual Potentially Vulnerable Area can be
found in Chapter 3 of this Plan. 
This local flood risk management plan also introduces new Objective Target Areas
(OTAs), which are located within potentially vulnerable areas and should benefit from
objectives and actions to manage flood risk. These objectives and actions to manage
flooding have been set for each target area in the flood risk management plans. The
OTAs are based on communities at risk of flooding. 
Organisations such as Scottish Water, energy companies and Historic Environment
Scotland actively maintain and manage their own assets, including the risk of
flooding. These actions are not detailed further in the Local Flood Risk Management
Plans.
Page 199 of 354

Page 200

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 33 
Return to Contents Page 
Figure 2 - Potentially Vulnerable Areas in the Tay Local Plan District
(Reproduced from the Tay Flood Risk Management Plan, SEPA, December 2021)
Page 200 of 354

Page 201

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 34 
Return to Contents Page
Table 3: Summary of Actions to Manage Flood Risk Within PVAs During 2022-2028 
General Actions Specific Actions
Local
Plan
District
PVA OTA Location
Awareness Raising
Data to Support Climate Resilience
Emergency Plans
Flood Forecasting
Flood W
arning Development Framework
Future Flood Risk Management Planning
Guidance Development
Hazard Mapping Updates
Land Use Planning
Maintenance
Natural Flood Management Mapping
National Flood Risk Assessment
National Surface W
ater Mapping
Reservoirs 
Scottish Flood Defence Asset Database
Self Help
Adaptation Planning 
Community Engagement 
Community Resilience Group 
Flood Protection Scheme or W
orks 
Flood Study 
Flood W
arning Maintenance 
Maintenance of Existing Flood Scheme 
Sewer Flood Risk Assessment 
Surface W
ater Management Plan 
Tay
Estuary 07/09 235 Invergowrie ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓   ✓ 
Tay 08/01 172 Blair Atholl ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓  ✓    
08/02 254 Pitlochry ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓  ✓   
08/03 182 Weem ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓      ✓ ✓  
183 Aberfeldy ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓  ✓   ✓
08/04 189 Alyth  ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓  ✓    
08/05 230 Forfar ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓    
241 Kirriemuir ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓  
08/06 199 Blairgowrie &
Rattray ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓   ✓   ✓
Page 201 of 354

Page 202

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 35 
Return to Contents Page
08/07 214 Coupar Angus ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓   ✓   
08/08
179 Spittalfield ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓   ✓   
225 Dunkeld &
Birnam ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓  ✓ ✓   
273 Dalguise ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓      ✓   
08/09 194 Bankfoot ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓      
08/10 247 Luncarty ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓   ✓ 
08/11 255 Scone ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓  ✓ ✓  ✓  ✓
08/12
187 Almondbank ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓      ✓ ✓  
249 Methven ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓    
253 Perth ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/13 213 Comrie ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓  ✓ ✓ ✓ ✓
08/14 205 Bridge of Earn ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓ ✓ ✓ ✓ 
Forth 09/03 198 Blackford ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓     
Forth
Estuary 10/03 239 Kinross ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓   ✓ ✓ ✓
303 Milnathort ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓  ✓   ✓ ✓ ✓ 
Page 202 of 354

Page 203

Tay Local Flood Risk Management Plan 
Chapter 3 - Potentially Vulnerable Areas | 36 
Return to Contents Page
Chapter.2 Potentially Vulnerable Areas (PVAs) 
Potentially Vulnerable Areas (PVAs) are catchments identified as being at medium to
high risk of flooding and where the impact of flooding is sufficient to justify further
assessment and appraisal. There are 14 PVAs within this Local Plan District as
shown in Figure 2. 
The main focus of this Local Flood Risk Management Plan is to manage flood risk in
these PVAs where specific actions apply in addition to the general actions (listed in
Section 2.3). The following chapter therefore details the objectives and planned
actions that have been prioritised for delivery between 2022 and 2028 in each of the
14 Potentially Vulnerable Areas (PVAs) within the Tay Local Plan District. 
The information presented is based on Section 2.3 of the Tay Flood Risk
Management Plan and includes the background to the area, the current
understanding of flood risk and the objectives for flood risk management. A number
of tables have also been provided which set out the actions to manage flooding in
the Objective target Areas and identify who will be responsible for the delivery and
implementation of the actions, along with a timetable of when the actions will be
undertaken and the coordination and funding arrangements. 
It should be noted that the general actions to manage flooding across the Local Plan
District (as set out in Section 2.3) apply to each PVA as well as the identified specific
actions set out in the following sections.  
Page 203 of 354

Page 204

Tay Local Flood Risk Management Plan 
Chapter 3 - Potentially Vulnerable Areas | 37 
Return to Contents Page
3.1 List of Potentially Vulnerable Areas (PVAs) 
The following table provides links to further information on these areas.
PVA Ref PVA Name Local Authority Area Page number
02/08/01 Blair Atholl Perth & Kinross 31
02/08/02 Pitlochry Perth & Kinross 50
02/08/03 Aberfeldy and Weem Perth & Kinross 55
02/08/04 Alyth Perth & Kinross 63
02/08/05 Kirriemuir and Forfar Angus 67
02/08/06 Blairgowrie and Rattray Perth & Kinross 75
02/08/07 Coupar Angus Perth & Kinross 79
02/08/08 Dunkeld and Birnam Perth & Kinross 83
02/08/09 Bankfoot Perth & Kinross 95
02/08/10 Luncarty  Perth & Kinross 98
02/08/11 Scone Perth & Kinross 102
02/08/12 Perth and Almondbank Perth & Kinross 108
02/08/13 Comrie Perth & Kinross / Stirling 123
02/08/14 Bridge of Earn Perth & Kinross 129 
Page 204 of 354

Page 205

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 38 
Return to Contents Page 
3.1 Blair Atholl - PVA 02/08/01 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Garry (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to the flood risk to Blair
Atholl. The main source of flooding is the River Garry and small watercourses. There
is a history of flooding in the area, with recent floods occurring as a result of river
flooding from the River Garry. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Blair Atholl  Objective Target Area 172 
Page 205 of 354

Page 206

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 39 
Return to Contents Page
Blair Atholl (Objective Target Area 172) 
Summary Location Map
Blair Atholl is a village in Perthshire
located on the banks of the River
garry and River Tilt. The main source
of flooding in Blair Atholl is river
flooding. There are approximately 50
people and 70 homes and
businesses currently at risk from
flooding. This is likely to increase to
80 people and 100 homes and
businesses by the 2080s due to
climate change. There are roads and
railways at risk of flooding, which may
cause travel disruption. 
(© Crown copyright and database 
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national assessment of river flooding has been improved by a
SEPA led modelling project that improved the existing flood maps.
There is a history of flooding in this area. Most recently in December 2015, Storm
Desmond caused the River Garry to flood, inundating 17 homes and businesses,
Further flooding occurred in January 2016. 
Objectives and Actions in the Blair Atholl Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): FLOOD STUDY (Ref: 17201)
Objective (ID): Reduce the risk of river flooding in Blair Atholl (Ref: 1723)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2025-2027
Page 206 of 354

Page 207

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 40 
Return to Contents Page
Description:
A flood study has been recommended for Blair Atholl. The study
will build on previous work carried out in the area and consider
both current and long-term flood risk and how the area will adapt
to changes in flood risk through adaptive planning.
Coordination
Arrangement:
The study is programmed to commence in the 2025/26 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the fluvial flood risk and identify potential options for
managing that risk.
The study will be coordinated through the Tay Local Plan District
Partnership and with other related actions.
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 17202)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blair Atholl (Ref: 1722)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities will be coordinated through the Tay Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be funded from the
Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 17203)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blair Atholl (1722)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority. 
The Blair Atholl and Struan Community Resilience Group forms
part of the A9 Resilience Plan. Perth and Kinross Council will
continue to communicate and support the group on flood risk
Page 207 of 354

Page 208

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 41 
Return to Contents Page
matters. The resilience plan should be reviewed and updated
regularly by the group, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the Blair
Atholl and Struan Community Resilience Group to manage flood
risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Page 208 of 354

Page 209

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 42 
Return to Contents Page
3.2 Pitlochry - PVA 02/08/02 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to the flood risk to
Pitlochry. The main source of flooding is the River Tummel and small watercourses.
There is a long history of flooding in this area including recent flooding in August
2020. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Pitlochry  Objective Target Area 254  
Page 209 of 354

Page 210

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 43 
Return to Contents Page 
Pitlochry (Objective Target Area 254) 
Summary Location Map
Pitlochry is located on the banks of
the
River Tummel within the Perth and
Kinross. The main source of flooding
is river flooding from the River
Tummel and small watercourses. 
Perth and Kinross Council has carried
out a flood study in this area which
estimated that there are
approximately 155 homes and 75
businesses currently at risk of
flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the completion
of the Pitlochry Flood Study in 2018. The national understanding of surface water
flooding was improved by a sewer flood risk assessment. 
There is a long history of flooding in the Pitlochry area. In January 1993, widespread
flooding across the Tay catchment resulted in over £20 million of damage; the flood
affected Pitlochry. In July 2002 torrential rain caused river flooding to several homes
and the local distillery. A subsequent landslide caused further damage to roads and
homes. The area was exposed to significant weather events including Storms
Desmond and Frank in December 2015 and January 2016, which resulted in flooding
in the Tay and Tummel catchments. In July 2016, the Moulin Burn flooded affecting
shops, houses and roads. Most recently flooding in August 2020 affected a number
of properties on Atholl Road. 
Objectives and Actions in the Pitlochry Target Area 
The objectives and actions for this target area are set out in the tables below.
Page 210 of 354

Page 211

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 44 
Return to Contents Page
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD PROTECTION SCHEME (Ref: 25401)
Objective (ID): Reduce the risk of river flooding from the small watercourses in
Pitlochry (Ref: 2543)
Delivery Lead: Perth and Kinross Council
Status: Not Started Planned Delivery Period: To be confirmed
Description:
A flood protection scheme has been proposed for Pitlochry. A
number of potential measures were identified for different
locations, including flood defences, flood storage, managed
diversions and natural flood management. The majority of these
measures would provide a 1 in 200-year standard of protection
(including a further allowance for climate change). However, one
flood storage measure would adopt a lower 1 in 100-year
standard of protection. These measures would also mitigate
flood risk to other properties in the area but not to the same
design standard. The study recommends that Perth and Kinross
Council should select a preferred scheme and develop the
proposals further. This work will also include ongoing community
engagement as the project progresses. The scheme will then
progress to the statutory process set out under the Flood Risk
Management (Scotland) Act 2009. The detailed design will be
completed thereafter. 
Current and long-term flood risk have been considered,
including how the flood protection scheme and this area will
adapt to changes in flood risk through development of an
adaptation plan. 
Following completion of the detailed design, the proposed
scheme should be procured and will progress to construction.
As built drawings should be made available to SEPA, for
inclusion in the Scottish Flood Defence Asset Database, flood
map updates and flood warning scheme updates. 
Routine inspections and maintenance of the Pitlochry Flood
Protection Scheme should commence when the scheme is
complete in accordance with the inspection and maintenance
regime. 
In accordance with the flood risk management plan, as part of
the scheme or works, the responsible authority should aim to
ensure the action will not have an adverse effect on the integrity
of the River Tay Special Area of Conservation.
Coordination
Arrangement:
The Pitlochry Flood Protection Scheme will be coordinated
through the Tay Local Plan District Partnership. SEPA will work
with the local authority on the potential to coordinate this action
with an update to SFDAD and flood warning actions.
Page 211 of 354

Page 212

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 45 
Return to Contents Page
Funding
Arrangement:
The delivery of the Pitlochry Flood Protection Scheme is subject
to capital funding being made available (up to 80% capital grant
funding from the Scottish Government with the remaining
funding being provided from Perth & Kinross Council's capital
programme). 
Action (ID): FLOOD PROTECTION WORKS (Ref: 25402)
Objective (ID): Reduce the risk of flooding from the culverts on the A9 in the
vicinity of Dalshian area in Pitlochry (Ref: 2544)
Delivery Lead: Transport Scotland
Status: TBC Planned
Delivery Period: TBC
Description:
Transport Scotland will continue to carry out civil engineering
works in connection with the A9 dualling project which will
reduce the risk of flooding on identified sections of the trunk
road.
Coordination
Arrangement: To be determined once the actions have been finalised.
Funding
Arrangement: Transport Scotland to confirm 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 25403)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Pitlochry (Ref: 2542)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in the
area by SEPA and the responsible authorities to raise
awareness of flood risk. Community engagement activity will
continue in connection with any on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Perth and Kinross Council will continue to coordinate with the
Pitlochry and Moulin Community Resilience Group on a priority
needs basis where resources allow.
Funding
Arrangement:
Community engagement activities will be subject to funding from
the Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Page 212 of 354

Page 213

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 46 
Return to Contents Page
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 25404)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Pitlochry (Ref: 2542)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Pitlochry and Moulin Community Resilience group operates
in this area. Perth and Kinross Council will continue to
communicate and support the group on flood risk matters. The
resilience plan should be reviewed and updated regularly by the
group, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Pitlochry and Moulin Community Resilience Group to manage
flood risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 25405)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Pitlochry (Ref: 2542)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. SEPA will maintain the River Tay flood
warning scheme.
Coordination
Arrangement:
SEPA will continue to raise awareness of flood warning, and
engage with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Page 213 of 354

Page 214

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 47 
Return to Contents Page
3.3 Aberfeldy and Weem - PVA 02/08/03 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Aberfeldy
and Weem. The main sources of flooding are the River Tay and the Moness Burn,
and there is also risk from surface water. There is a history of flooding in this area,
with recent floods being caused by surface water. 
List of Objective Target Areas 
There are two target areas in this potentially vulnerable area, which have been the
focus of further assessment. These are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Weem   Target Area 182
Aberfeldy  Target Area 183  
Page 214 of 354

Page 215

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 48 
Return to Contents Page 
Weem (Objective Target Area 182) 
Summary Location Map
The village of Weem is located near
the town of Aberfeldy within Perth and
Kinross. The main source of flooding
in Weem is river flooding with a small
proportion of risk coming from surface
water. A flood protection scheme is in
place that offers protection to the
community. There are approximately
40 people and 30 homes and
businesses at risk from flooding. This
is estimated to increase to 50 people
and 40 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011, SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the Aberfeldy
Flood Study which was completed in 2019. The study also assessed flooding in
Weem and reviewed the standard of protection offered by the existing flood scheme. 
There is a long record of flooding in this area. Recent significant floods have
occurred in January 1993, January 2005, December 2006 and in December 2015.
The most recent flood was recorded in January 2020 when the Aberfeldy to Weem
road was closed due to flooding caused by Storm Dennis. 
Objectives and Actions in the Weem Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 215 of 354

Page 216

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 49 
Return to Contents Page
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 18201)
Objective (ID): Avoid an increase in flood risk by the appropriate management
and maintenance of Weem Flood Protection Scheme (Ref:1822)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the existing Weem Flood Protection Scheme will
continue in accordance with the existing inspection and
maintenance regime. Further maintenance work will also be
carried out as identified by the recent review undertaken as part
of the Aberfeldy flood study.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth and Kinross Council’s revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 18202)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Weem (Ref: 1823)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage
with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Page 216 of 354

Page 217

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 50 
Return to Contents Page
Aberfeldy (Objective Target Area 183) 
Summary Location Map
Aberfeldy is located on the River Tay
within the Perth and Kinross. The
main source of flooding in Aberfeldy is
river flooding, however there is also a
risk from surface water flooding.
Perth and Kinross Council carried out
a flood study in this area which
estimated that there are
approximately 128 homes and 40
businesses are at risk of flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the Aberfeldy
Flood Study, which was completed in 2019. The national understanding of surface
water flooding is improved by a sewer flood risk assessment undertaken by Scottish
Water. 
There is a long record of flooding in this area. Significant floods have occurred in
January 1993, January 2005, December 2006 and in December 2015. The most
recent flooding was recorded in February 2020 during Storm Dennis when surface
water runoff from fields caused flooding to 2 properties as well as flooding to roads.
Further surface water flooding occurred in February 2021, however there is no
record of properties being affected internally. 
Objectives and Actions in the Aberfeldy Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 217 of 354

Page 218

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 51 
Return to Contents Page
Action (ID): FLOOD PROTECTION SCHEME (Ref: 18301)
Objective (ID): Reduce the risk of surface water and river flooding from the River
Tay and Moness Burn in Aberfeldy (Ref: 1833)
Delivery Lead: Perth and Kinross Council
Status: Not Started Planned Delivery Period: To be confirmed
Description:
A flood protection scheme has been proposed in this area. The
proposed scheme would consist of flood walls and embankments
on the River Tay and the Moness Burn, along with culvert
improvements on the Tomchulan Burn. The proposed scheme
would provide a 1 in 200 year standard of protection. Current and
long-term flood risk will be further considered at the design stage
including the impacts of climate change and scheme adaptability.
The outline design for the Aberfeldy Flood Protection Scheme will
be progressed, in line with the recommendations of the Aberfeldy
flood study. The flood study also recommended further
consideration of natural flood management as part of the
preferred option. This work is to also include ongoing community
engagement as the project progresses. 
Once the flood protection scheme has been confirmed and the
detailed design completed, the next stages are procurement then
construction. 
As built drawings will be made available to SEPA, for inclusion in
the Scottish Flood Defence Asset Database, flood map updates
and flood warning scheme updates. 
Routine inspections and maintenance of the Aberfeldy Flood
Protection Scheme would commence when the scheme is
complete in accordance with the inspection and maintenance
regime.
In accordance with the flood risk management plan, as part of the
scheme or works, Perth and Kinross Council will aim to ensure
the action will not have an adverse effect on the integrity of the
River Tay Special Area of Conservation.
Coordination
Arrangement:
The Aberfeldy Flood Protection Scheme will be coordinated
through the Tay Local Plan District Partnership. SEPA will work
with the local authority on the potential to coordinate this action
with an update to SFDAD and flood warning actions.
Funding
Arrangement:
The delivery of the Aberfeldy Flood Protection Scheme is subject
to capital funding being made available (up to 80% capital grant
funding from the Scottish Government with the remaining funding
being provided from Perth & Kinross Council's capital
programme). 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 18302)
Objective (ID): Reduce the risk of surface water and river flooding from the River
Tay and Moness Burn in Aberfeldy (Ref: 1833)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned
Delivery Period: 2025 - 2027  
Page 218 of 354

Page 219

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 52 
Return to Contents Page
Description:
Perth & Kinross Council will engage consulting engineers to
develop a surface water management plan for Aberfeldy. This will 
investigate the surface water flood risk and identify potential
options for managing that risk. The results of the sewer flood risk
assessment will be considered. Current and long term flood risk
will be assessed and if climate change impacts are found to be
significant, surface water management should include adaptive
planning.
Coordination
Arrangement:
The surface water management plan is programmed to
commence in the 2026/26 financial year and will be coordinated
through the Tay Local Plan District Partnership.
Scottish Water will support surface water management planning
through ensuring that best available knowledge and data is used
to input into the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 18303)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Aberfeldy (Ref: 1832)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. 
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with any on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities will be coordinated through the Tay Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Perth and Kinross Council will continue to coordinate with the
Aberfeldy Resilience Group and the Tayside Waders Group on a
priority needs basis where resources allow.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUPS (Ref: 18304)
Objective (ID): Prepare for current flood risk and future flooding as a result
of climate change in Aberfeldy (Ref: 1832)
Page 219 of 354

Page 220

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 53 
Return to Contents Page
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
Perth and Kinross Council will continue to liaise with the Aberfeldy
Resilience Group and the Tayside Waders Group on flood risk
matters. Their resilience plans should be reviewed and updated
regularly, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Aberfeldy Resilience Group and the Tayside Waders to manage
flood risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow
Funding
Arrangement:
Funding for Community resilience groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 18305)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Aberfeldy (Ref: 1832)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Page 220 of 354

Page 221

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 54 
Return to Contents Page
3.4 Alyth - PVA 02/08/04 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council Alyth Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to the flood risk at Alyth.
The main source of flooding is the Alyth Burn. There is a history of flooding in this
area, with recent flooding recorded in August 2020. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Alyth  Objective Target Area 189 
Page 221 of 354

Page 222

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 55 
Return to Contents Page 
Alyth (Objective Target Area 189) 
Summary Location Map
The town of Alyth is located 6km
northeast of Blairgowrie within Perth
and Kinross. The main source of
flooding is river flooding from the Alyth
Burn. 
There are approximately 180 people
and 120 homes and businesses
currently at risk of flooding. This is
likely to increase to 240 people and
150 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. Pervious work has underpinned the understanding of river flooding and the
Joint Agency Report on the Flooding in Alyth of 17 July 2015 further improved the
understanding of flooding mechanisms in this area.
There are records of frequent flooding in this area. A significant flood was recorded
in July 2015 when the Alyth Burn burst its banks, affecting many homes and
businesses. A notable flood occurred in August 2020, when the Alyth Burn and other
small watercourses overtopped resulting in flooding of properties. Further flooding
occurred in October 2020 and October 2021 but no properties in the area were
flooded. 
Objectives and Actions in the Alyth Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 222 of 354

Page 223

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 56 
Return to Contents Page
Action (ID): FLOOD STUDY (Ref: 18901)
Objective (ID): Reduce the risk of river flooding from the Alyth Burn in Alyth (Ref:
1893).
Delivery Lead: Perth and Kinross Council
Status: On-going Planned Delivery Period: 2022-2023
Description:
A natural flood management study is underway for Alyth as
identified in the published Cycle 1 Tay Flood Risk Management
Strategy and Local Flood Risk Management Plan. The study is
considering both current and long-term flood risk and how the
area will adapt to changes in flood risk due to climate change.
Coordination
Arrangement:
The study commenced in January 2022. Perth and Kinross
Council has engaged consulting engineers, AECOM, to
investigate the fluvial flood risk and identify potential options for
managing that risk. The study is being coordinated through the
Tay Local Plan District Partnership.
Funding
Arrangement:
The study is being funded from Perth and Kinross Council’s
revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 18902)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Alyth (Ref: 1892).
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
This will include continuing to support the Alyth Community
Support Group and updating the community on the outcomes of
the natural flood management study. 
Funding
Arrangement:
Community engagement activities will be subject to funding from
the Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 18903)
Objective (ID): Prepare for current flood risk and future flooding as a result
of climate change in Alyth (Ref: 1892).
Page 223 of 354

Page 224

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 57 
Return to Contents Page
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority. 
The Alyth Community Support Group has been set up and has
developed a community resilience plan, alongside other resilience
work. The resilience plan should be reviewed and updated
regularly by the group, and this will be supported by the Council.
Coordination
Arrangement:
Perth and Kinross Council will continue to coordinate with the
Alyth Community Support Group to manage flood risk, improve
preparedness and increase resilience against flooding. The
Council will continue to co-ordinate with the group on a priority
needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding 
Page 224 of 354

Page 225

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 58 
Return to Contents Page
3.5 Kirriemuir & Forfar - PVA 02/08/05 
Local Plan District Local Authority Main Catchment
Tay Angus Council River Isla (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Kirriemuir
and Forfar. The main source of flooding is surface water. There is also risk of river
flooding to Forfar from the Dean Water and to Kirriemuir from the Gairie Burn. There
is a history of flooding in this area, with recent floods being caused by surface water. 
List of Objective Target Areas 
There are two target areas in this potentially vulnerable area, which has been the
focus of further assessment. These are identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Forfar    Target Area 230
Kirriemuir   Target Area 241 
Page 225 of 354

Page 226

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 59 
Return to Contents Page 
Forfar (Objective Target Area 230) 
Summary Location Map
Forfar is a town located north of
Dundee and within the Angus Council
Area. The main source of flooding in
Forfar is surface water flooding,
however there is a risk of river
flooding. There are approximately 870
people and 590 homes and
businesses currently at risk from
flooding. This is likely to increase to
1,100 people and 700 homes and
businesses by the 2080s due to
climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national assessment has been improved by flood studies
undertaken by Angus Council and Scottish Water. There is a history of localised
flooding in this area. 
Objectives and Actions in the Forfar Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD STUDY (OPTIONS APPRAISAL) (Ref: 23001)
Objective (ID): Reduce the risk of river and surface water flooding in Forfar (Ref:
2303)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description: Angus Council will review the 2019 flood study outcomes and
consider whether an additional detailed study of Forfar Loch and
Page 226 of 354

Page 227

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 60 
Return to Contents Page
Dean Water interaction will provide further opportunities for
actions to reduce flood risk in the Forfar area. The additional
detailed study will focus on the interaction of surface water
flooding locations which discharge to Forfar Loch and the Forfar
Loch to Dean Water interaction.
Coordination
Arrangement:
The study is programmed to commence in the [TBC] financial
year. Angus Council will engage a consulting engineer to
investigate the fluvial and pluvial flood risk and identify potential
options for managing that risk.
The study will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement:
The flood study will be subject to funding from Angus Council’s
revenue budget. 
Action (ID): ADAPTION PLAN (23002)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Forfar (Ref: 2302)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
An adaptation master plan will be developed to cover the Angus
Council area. As part of this, Angus Council will use best
available knowledge on climate change predictions to assess the
effect on flood risk infrastructure. From this a long term flood risk
management approach will be developed. Any existing strategic
initiatives will provide opportunities for adaptive actions to be
implemented.
Coordination
Arrangement:
The adaptation plan is programmed to commence in the [TBC]
financial year. Angus Council will engage a consulting engineer to
develop the adaptation plan.
The adaptation plan will be coordinated through the Tay Local
Plan District Partnership.
Funding
Arrangement:
The adaptation plan will be subject to funding from Angus
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGMENT (Ref: 23003)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Forfar (Ref: 2302)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with any on-going projects and activities.
Coordination
Arrangement:
The community will have opportunities to get involved with the
development of the adaptation plan and any flood related projects
and initiatives being developed for Forfar. This will include the
flood study and the adaptation plan
Page 227 of 354

Page 228

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 61 
Return to Contents Page
Funding
Arrangement:
Community engagement activities will be funded from the
Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Page 228 of 354

Page 229

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 62 
Return to Contents Page
Kirriemuir (Objective Target Area 241) 
Summary Location Map
The town of Kirriemuir is located
northwest of Forfar within the Angus
area. 
The main sources of flooding in
Kirriemuir are surface water and river
flooding. There are approximately 140
people and 80 homes and businesses
currently at risk from flooding. This is
likely to increase to 180 people and
110 homes and businesses by the
2080s due to climate change 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national assessment has been improved by flood studies
undertaken by Angus Council and Scottish Water. There is a history of localised
flooding in this area. 
Objectives and Actions in the Kirriemuir Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): FLOOD SCHEME OR WORKS IMPLEMENTATION (Ref: 24101)
Objective (ID): Reduce the risk of river flooding from the Gairie Burn in Kirriemuir
(Ref: 2415)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
A flood study carried out for this location recommended a short-
term option to manage flood risk. The preferred option consists of
property flood resilience and localised kerb raising. It will be used
in conjunction with the installation of a river gauge on the Gairie
Burn to improve understanding of flood risk and support future
Page 229 of 354

Page 230

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 63 
Return to Contents Page
work.
In accordance with the flood risk management plan, as part of the
scheme or works, the responsible authority should aim to ensure
that the action will not have an adverse effect on the integrity of
the Loch of Kinnordy Special Protection Area.
Coordination
Arrangement:
The works will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement: TBC 
Action (ID): DATA COLLECTION (Ref: 24102)
Objective (ID): Improve data and understanding of river flooding from the Gairie
Burn in Kirriemuir (Ref: 2413)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
Angus Council will review the Kirriemuir flood study of 2019 and
prepare a contract for installation of flow monitoring on the Gairie
Burn to reduce the uncertainty around flow estimation identified in
the 2019 study. This will improve confidence levels in the flood
study findings and allow the impact of climate change to be
assessed for Kirriemuir.
Coordination
Arrangement:
The work will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement:
This work will be subject to funding from Angus Council’s revenue
budget. 
Action (ID): ADAPTION PLAN (Ref: 24103)
Objective (ID): Improve data and understanding of river flooding from the Gairie
Burn in Kirriemuir (Ref: 2413)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
Information on climate change is to be used to develop an
adaptation plan to allow for the impacts of climate change to be
monitored, understood and managed. 
An adaptation master plan will be developed to cover the Angus
Council area. As part of this, Angus Council will use best
available knowledge on climate change predictions to assess the
effect on flood risk infrastructure. From this a long term flood risk
management approach will be developed. Any existing strategic
initiatives will provide opportunities for adaptive actions to be
implemented. 
Coordination
Arrangement:
The adaptation plan is programmed to commence in the [TBC]
financial year. Angus Council will engage a consulting engineer to
develop the adaptation plan.
The adaptation plan will be coordinated through the Tay Local
Plan District Partnership.
Page 230 of 354

Page 231

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 64 
Return to Contents Page
Funding
Arrangement:
The adaptation plan will be subject to funding from Angus
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 24104)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Kirriemuir (Ref: 2414)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities.
Coordination
Arrangement:
The community will have opportunities to get involved with the
development of the adaptation plan and any flood related projects
and initiatives being developed for Kirriemuir. Angus Council will
consider whether there is potential for provision of a community
flood warning system (such as River Track) as part of a wider
flood resilience approach for Kirriemuir and will discuss this with
partners. 
Funding
Arrangement:
Community engagement activities will be funded from the
Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): FLOOD DEFENCE MAINTENANCE (Ref: 24105)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of Kirriemuir Flood Protection Scheme (Ref:
2412)
Delivery Lead: Angus Council
Status: Existing Planned Delivery Period: On-going
Description:
Angus Council will continue to maintain the flood defences on the
Gairie Burn and seek opportunities to work with partners to
reduce flood risk to existing commercial property impacted by the
burn.
Coordination
Arrangement:
Angus Council maintain existing flood protection schemes
through a programme of inspections carried out in accordance
with the recommendations set out in the scheme maintenance
manuals. Maintenance works will be coordinated with SEPA,
NatureScot, landowners and other stakeholders as required.
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Angus Council’s revenue budget.  
Page 231 of 354

Page 232

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 65 
Return to Contents Page
3.6 Blairgowrie & Rattray - PVA 02/08/06 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Ericht (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to
Blairgowrie and Rattray. The main source of flooding in Blairgowrie is surface water.
There is a history of flooding in this area with recent flooding recorded in August
2020, October 2021 and November 2022. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Blairgowrie and Rattray  Target Area 199  
Page 232 of 354

Page 233

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 66 
Return to Contents Page
Blairgowrie and Rattray (Objective Target Area 199) 
Summary Location Map
This community includes the towns of
Blairgowrie and Rattray. The main
source of flooding is surface water.
There are approximately 750 people
and 440 homes and businesses
currently at risk from flooding. This is
likely to increase to 1,100 people and
630 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. Scottish Water has delivered an assessment of flood risk within the
Blairgowrie sewer catchment.
There is a long record of flooding in this target area. In July 2004 a road and 2
properties were affected by surface water flooding. In July, October and December
2015 heavy rainfall led to flooding of a number of properties as well as road flooding.
Flooding was recorded on 12 August 2020 when local roads and 5 properties
flooded as a result of heavy rainfall in the area. In October 2021 flooding on the
Rattray Burn affected 1 property in Rattray. Further flooding occurred on the Rattray
Burn in November 2022.
Objectives and Actions in the Blairgowrie and Rattray Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 233 of 354

Page 234

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 67 
Return to Contents Page
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 19901)
Objective (ID): Reduce the risk of surface water flooding in Blairgowrie
and Rattray (Ref: 1993)
Delivery Lead: Perth and Kinross Council
Status: Started  Planned Delivery Period: 2022 - 2024
Description:
Perth and Kinross Council has engaged consulting engineers to
develop a surface water management plan for Blairgowrie and
Rattray. This will investigate the surface water flood risk and
identify potential options for managing that risk. The results of the
sewer flood risk assessment will be considered. Current and long-
term flood risk will be assessed and if climate change impacts are
found to be significant, surface water management should include
adaptive planning.
Coordination
Arrangement:
The surface water management plan is programmed to be
concluded in the 2023/24 financial year and is being coordinated
through the Tay Local Plan District Partnership.
Scottish Water will support surface water management planning
through ensuring that best available knowledge and data is used
to input into the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 19902)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blairgowrie and Rattray (Ref: 1992)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with any on-going projects and activities.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities will be coordinated through the Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 19903)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blairgowrie and Rattray (Ref: 1992)
Page 234 of 354

Page 235

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 68 
Return to Contents Page
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority. 
Blairgowrie Community Resilience Group is active in this area.
The resilience group should continue to implement the
community emergency plan.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Blairgowrie Community Resilience Group to manage flood risk,
improve preparedness and increase resilience against flooding.
The Council will continue to co-ordinate with the group on a
priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 19904)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blairgowrie and Rattray (Ref: 1992)
Delivery Lead: SEPA
Status: Existing  Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Coordination
Arrangement:
SEPA will maintain the Ericht flood warning scheme. SEPA will
continue to raise awareness of flood warning, and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Page 235 of 354

Page 236

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 69 
Return to Contents Page
3.7 Coupar Angus - PVA 02/08/07 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council Coupar Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Coupar
Angus. The main source of flooding is the Coupar Burn. There is history of flooding
in this area with recent floods caused by river flooding. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below.  
Coupar Angus  Target Area 214  
Page 236 of 354

Page 237

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 70 
Return to Contents Page 
Coupar Angus (Objective Target Area 214) 
Summary Location Map
Coupar Angus is located to the
northeast of Perth on the banks of the
River Isla within Perth and Kinross.
The main source of flooding in Coupar
Angus is river flooding from the
Coupar Burn and small tributaries. A
local detailed flood study undertaken
by Perth and Kinross Council
indicates that there are approximately
30 homes and businesses currently at
risk of flooding, and that this may
increase to 62 homes and businesses
in the future due to climate change.   
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is improved by the Coupar Burn
Flood Study completed in 2016 and the SEPA modelling study to improve flood
maps in the area. The study concluded that structural actions such as a flood
protection scheme were not viable.
There is a long history of flooding in this area from the Coupar Burn including
flooding in August 2004 and December 2012, when several homes and businesses
flooded from Coupar Burn. In December 2015, Storm Frank caused prolonged
rainfall across Perth & Kinross. Several roads were affected in the Coupar Angus
area. Flooding on the Coupar Burn occurred in February 2021 and November 2022
but there is no record of properties being affected. 
Objectives and Actions in the Coupar Angus Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 237 of 354

Page 238

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 71 
Return to Contents Page 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 21401)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Coupar Angus (Ref: 2143)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
Coordination
Arrangement:
SEPA will maintain the Isla flood warning scheme. SEPA will
continue to raise awareness of flood warning, and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 21402)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Coupar Angus (Ref: 2143)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by the
local authority. 
The Coupar Angus Community Resilience Group operates in this
area. Perth and Kinross Council will continue to communicate and
support the group on flood risk matters. The resilience plan should
be reviewed and updated regularly by the group, and this will be
supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the Coupar
Angus Community Resilience Group to manage flood risk, improve
preparedness and increase resilience against flooding. The Council
will continue to co-ordinate with the group on a priority needs basis
where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): LAND USE PLANNING (Ref: 21403)
Objective (ID): Avoid development that increases flood risk in Coupar Angus (Ref:
2141)
Delivery Lead: Perth & Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
As planning authority, Perth and Kinross Council will ensure that
their development plan and planning decision-making supports the
delivery of sustainable flood management. Perth and Kinross
Page 238 of 354

Page 239

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 72 
Return to Contents Page
Council will introduce protection for the Kettins Burn natural flood
storage area through the local development planning process. 
Coordination
Arrangement:
Existing controls are already in place as set out under the Land
Use Planning action. Perth and Kinross Council will further align
the flood risk management and land use planning systems in this
location. The Council will coordinate land use planning with other
related actions. 
Funding
Arrangement:
Planning activities are subject to funding from Perth and Kinross
Council’s revenue budget. 
Page 239 of 354

Page 240

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 73 
Return to Contents Page
3.8 Dunkeld & Birnam - PVA 02/08/08 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Dunkeld
& Birnam, Dalguise and Spittalfield. The main source of flood risk is the River Tay,
the River Braan and small watercourses in Dunkeld and Birnam. The main source of
flood risk in Dalguise and Spittalfield is the River Tay. There is history of flooding in
the area.   
List of Objective Target Areas 
There are three objective target areas in this potentially vulnerable area, which have
been the focus of further assessment. These are listed below. Further information on
the objectives and actions to manage flood risk within this area is provided below. 
Spittalfield   Target Area 179
Dunkeld & Birnam  Target Area 225
Dalguise   Target Area 273  
Page 240 of 354

Page 241

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 74 
Return to Contents Page 
Spittalfield (Objective Target Area 179) 
The small settlement of Spittalfield is
located near the River Tay in Perth
and Kinross. 
The main concern is flooding from the
River Tay to homes and the A984,
and how this risk may change in future
because of climate change. SEPA's
flood maps indicate that currently
there are approximately 6 homes and
businesses at risk from flooding. This
is estimated to increase to 40 homes
and businesses by the 2080s due to
climate change. However, Perth and
Kinross Council has carried out a
flood study in this area which predicts
that this number is higher with an
estimated 18 homes and businesses
currently at risk, which is likely to
increase to 50 due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by a recent flood
study.
There is a record of periodic flooding in this area. The first flood recorded in the area
occurred in January 1993 when heavy rain and snow melt inundated roads around
the Green. Further flooding occurred in 2006 with property flooding and the A894
being affected. The most recent flood was recorded in December 2015 due to Storm
Desmond, when roads and properties were affected. In January 2018 surface water
flooding was reported in Spittalfield however there is no record of properties being
affected by flooding. 
Objectives and Actions in the Spittalfield Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 241 of 354

Page 242

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 75 
Return to Contents Page 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 17901)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Spittalfield (Ref: 1792)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Spittalfield and Caputh Community Resilience Group
operates in this area. Perth and Kinross Council will continue to
communicate and support the group on flood risk matters. The
resilience plan should be reviewed and updated regularly by the
group, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Spittalfield and Caputh Community Resilience Group to manage
flood risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): EMERGENCY PLAN (Ref: 17902)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Spittalfield (Ref: 1792)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2022 - 2028
Description:
The plan to coordinate responses to emergency incidents
between organisations, including local authorities, the emergency
services and SEPA, is to be maintained and executed as
required.
Perth and Kinross Council will include specific emergency
planning arrangements for Spittalfield within its current Generic
Emergency Plan and Flooding Emergency Response Plan.
Coordination
Arrangement:
Perth & Kinross Council has developed a Generic Emergency
Plan and a Flooding Emergency Response Plan, designed to
ensure that contingency measures are in place for the
coordinated and flexible response to flooding incidents to mitigate
the effects of flooding emergencies.
SEPA flood alerts and warnings will be monitored, and resources
made ready as required. An emergency response will follow any
reports of flooding, will be coordinated with regional and local
resilience partnerships and may be supported by the work of
voluntary organisations. A debrief and plan review will be carried
out following any flood events.
Page 242 of 354

Page 243

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 76 
Return to Contents Page
Protecting property from flooding is the responsibility of the owner
of the property, but local authorities can sometimes provide
sandbags to properties. Unfortunately the Council only has the
resources to supply sandbags to residents where there is an
imminent risk of flooding.
Funding
Arrangement:
Emergency response activities are subject to funding from Perth
and Kinross Council’s revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 17903)
Objective (ID): Prepare for current flood risk and future flooding as a result 
of climate change in Spittalfield (Ref: 1792)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: 2022-2028
Description:
SEPA will maintain the River Tay flood warning scheme. The
Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being
undertaken as required
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning, and engage
with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Page 243 of 354

Page 244

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 77 
Return to Contents Page
Dunkeld & Birnam (target area 225) 
Summary Location Map
The villages of Dunkeld, Little Dunkeld
and Birnam are located on the River
Tay and within Perth and Kinross. 
The main source of flooding in
Dunkeld and Birnam is river flooding
from the River Tay, the River Braan
and other small watercourses. A
recent flood study undertaken by Perth
and Kinross Council indicates that
there are approximately 104 homes
and businesses currently at risk of
flooding. This is likely to increase to
149 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is being improved by a current
flood study in the area.
There is a long record of flooding in this area, including notable flooding in February
1990 and January 1993. Further localised flooding occurred on the Spoutwells Burn,
at Burnmouth Road and at Inver in August 2004. In December 2015 and January
2016, Storms Desmond and Frank caused prolonged rainfall throughout Perth and
Kinross and properties and roads were affected in the Dunkeld area. The most
recent flooding occurred in February 2020, with properties on Atholl Gardens being
threatened by flooding from the Sawmill Burn
Objectives and Actions in the Dunkeld & Birnam Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 244 of 354

Page 245

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 78 
Return to Contents Page
Action (ID): FLOOD STUDY (Ref: 22501)
Objective (ID): Reduce the risk of river flooding from the River Tay, River
Braan and small watercourses in Dunkeld (Ref: 2255)
Delivery Lead: Perth & Kinross Council
Status: Existing Planned Delivery Period: 2020 - 2023
Description:
A flood protection study for Dunkeld was included in the Cycle 1
Tay Local Flood Risk Management Plan. The study is underway
and is being carried out as planned. The study is considering
current and future flood risk and the potential impacts of climate
change. 
Coordination
Arrangement:
The study commenced in January 2020. Perth and Kinross
Council engaged consulting engineers, AECOM, to investigate the
fluvial flood risk and identify potential options for managing that
risk. 
The study has involved the completion of existing investigations
by previous consulting engineers, Mouchel, into the flooding on
Atholl Gardens and Atholl Street, Dunkeld from the Spoutwells
Burn and another small watercourses. The study also took a
staged approach to allow coordination with SEPA on the Strategic
Mapping and Modelling Action for the River Tay (Cycle 1 Action
ID 80410016). 
The study has been coordinated through the Tay Local Plan
District Partnership.
Funding
Arrangement:
The flood study has been funded from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 22502)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dunkeld and Birnam (Ref: 2252)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in area by
SEPA and the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities.
Coordination
Arrangement:
Perth and Kinross will continue to coordinate with the Dunkeld
Community Resilience Group on a priority needs basis where
resources allow. 
Awareness raising and community engagement will take place
around any projects and will be coordinated through the Local
Plan District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Page 245 of 354

Page 246

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 79 
Return to Contents Page
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 22503)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dunkeld and Birnam (Ref: 2252)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Dunkeld Community Resilience Group operates in this area.
Perth and Kinross Council will continue to communicate and
support the group on flood risk matters. The resilience plan
should be reviewed and updated regularly by the group, and this
will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Dunkeld Community Resilience Group to manage flood risk,
improve preparedness and increase resilience against flooding.
The Council will continue to co-ordinate with the group on a
priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 22504)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dunkeld and Birnam (Ref: 2252)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: 2022-2028
Description:
SEPA should maintain the River Tay flood warning scheme. The
Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being
undertaken as required.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning, and engage
with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Page 246 of 354

Page 247

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 80 
Return to Contents Page
Dalguise (Objectve Target Area 273) 
Summary Location Map
The small settlement of Dalguise is
located on the western side of the
River Tay and within Perth and
Kinross. 
The main source of flooding in
Dalguise is river flooding. There are
approximately 20 people at risk from
flooding and approximately 20 homes
and businesses. There is also risk to
an activity centre, railway line and
local roads that become inundated
resulting in the community being cut
off. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national understanding of flooding in this area was also
improved by a previous flood study. This study did not identify a viable structural
flood management solution.
There is a long record of flooding in this area. In January 1993, a significant weather
event flooded 6 properties and caused extensive damage to the Perth to Inverness
railway line. In December 2006, 4 properties were flooded and again the railway line
was closed. The most recent flood was recorded in December 2018 when the
Dalguise Burn and River Tay inundated local roads.
Objectives and Actions in the Dalguise Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): EMERGENCY PLAN (Ref: 27301)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dalguise (Ref: 2732)
Delivery Lead: Perth and Kinross Council
Page 247 of 354

Page 248

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 81 
Return to Contents Page
Status: Not started Planned Delivery Period: 2023
Description:
Perth and Kinross Council will include specific emergency
planning arrangements for Dalguise within its current Generic
Emergency Plan and Flooding Emergency Response Plan. 
Coordination
Arrangement:
Perth & Kinross Council has developed emergency response
plans, designed to ensure that contingency measures are in place
for the coordinated and flexible response to flooding incidents to
mitigate the effects of flooding emergencies.
SEPA flood alerts and warnings will be monitored, and resources
made ready as required. An emergency response will follow any
reports of flooding, will be coordinated with regional and local
resilience partnerships and may be supported by the work of
voluntary organisations. A debrief and plan review will be carried
out following any flood events.
Protecting property from flooding is the responsibility of the owner
of the property, but local authorities can sometimes provide
sandbags to properties. Unfortunately, Councils only have the
resources to supply sandbags to residents where there is an
imminent risk of flooding.
SEPA will work with Perth and Kinross Council on the potential to
coordinate this action with flood warning actions.
Funding
Arrangement:
Funding is allocated to category 1 and 2 responders by the
Scottish Government for dealing with emergency response and in
extreme cases may reimburse responders after an extreme event.
Emergency response activities are subject to funding from Perth
and Kinross Council’s revenue budget. SEPA’s role in this action
is funded by Scottish Government through SEPA’s grant in aid
settlement. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 27302)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dalguise (Ref: 2732)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
SEPA will maintain the River Tay flood warning scheme. 
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
Coordination
Arrangement:
SEPA will continue to raise awareness of flood warning and
engage with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Page 248 of 354

Page 249

Tay Local Flood Risk Management Plan 
PVA 02/08/09 Bankfoot | 82 
Return to Contents Page
3.9 Bankfoot - PVA 02/08/09 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council Garry Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Bankfoot.
The main source of flooding is the Garry Burn and Glenhauch Burn. There is a
history of flooding in this area, with recent floods being caused by river flooding. 
List of Objective Target Areas 
There is 1 target area in this potentially vulnerable area, which has been the focus of
further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Bankfoot  Target Area 194  
Page 249 of 354

Page 250

Tay Local Flood Risk Management Plan 
PVA 02/08/09 Bankfoot | 83 
Return to Contents Page 
Bankfoot (target area 194) 
Summary Location Map
The village of Bankfoot lies
approximately 13km north of Perth,
within the Perth and Kinross. 
The main source of flooding in
Bankfoot is river flooding. The local
authority has carried out a flood study
in this area which estimated that there
are approximately 154 homes and
businesses at risk of flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk   
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by a flood study
completed for Bankfoot in 2015. The study concluded that a flood scheme was not
viable. The study described how on-going flood risk would be managed by other
actions.
There is a long history of flooding in this area, including notable flooding in January
1993, August 2004, July 2015 and February and October 2020. In February 2020
during Storm Dennis, the Garry Burn burst its banks, inundating a number of roads.
Some surface water flooding occurred in October 2020. Further minor flooding
occurred on the Garry Burn in February 2021. The most recent flooding occurred in
June 2022, when surface water runoff from fields affected the B867 and the gardens
of adjacent properties. 
Objectives and Actions in the Bankfoot Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Page 250 of 354

Page 251

Tay Local Flood Risk Management Plan 
PVA 02/08/09 Bankfoot | 84 
Return to Contents Page
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 19401)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Bankfoot (Ref: 1942)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
Perth and Kinross Council will continue to communicate with and
support the Auchtergaven Community Council and Bankfoot
Resilience Group on flood risk matters. The resilience plans
should be updated regularly by these groups, and this will be
supported by the council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Bankfoot Resilience Group to manage flood risk, improve
preparedness and increase resilience against flooding. The
Council will continue to co-ordinate with the group on a priority
needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Page 251 of 354

Page 252

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 85 
Return to Contents Page
3.10 Luncarty - PVA 02/08/010 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Luncarty.
The main sources of flooding are surface water and the River Tay and its tributaries.
River flood risk is likely to increase significantly because of climate change. A
number of floods have been recorded in this area. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Luncarty  Target Area 247  
Page 252 of 354

Page 253

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 86 
Return to Contents Page 
Luncarty (target area 247) 
Summary Location Map
Luncarty lies 6km north of Perth, near
the River Tay and within Perth and
Kinross. 
The main sources of flooding in
Luncarty are river flooding and surface
water flooding. There are
approximately 160 people and 90
homes and businesses currently at
risk of flooding. This is likely to
increase to 250 people and 130
homes and businesses by the 2080s
due to climate change. River flood risk
is likely to increase significantly
because of climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources, and this information has highlighted the risk of flooding in this area.
There are limited records of flooding in this area. Flooding occurred in January 1993
and further minor floods have been noted in February 2002, January 2005, July and
November 2009 and in July 2015 in the Westfield area when surface water flooding
affected roads. The most recent flood was recorded on 5 December 2015 from
Storm Desmond which caused some flooding of gardens in the area.
Selected Actions in the Luncarty Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD STUDY (Ref: 24701)
Objective (ID): Reduce the risk of river flooding in Luncarty (Ref: 2473)
Delivery Lead: Perth & Kinross Council
Page 253 of 354

Page 254

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 87 
Return to Contents Page
Status: Not started Planned Delivery Period: 2024-2026
Description:
Perth and Kinross Council will progress a flood study to look at
river flood risk in Luncarty. The flood risk from the River Tay, the
Shochie Burn and the Ordie Burn will be assessed. The impacts
of climate change on flood risk will be evaluated. The study will
include flood modelling, and if flood risk is confirmed, an appraisal
of potential future actions to manage flood risk and scoping of
future work will be carried out. 
Coordination
Arrangement:
The study is programmed to commence in the 2024/25 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the fluvial flood risk and identify potential options for
managing that risk.
The study will be coordinated through the Local Plan District
Partnership and with other related actions. 
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 24702)
Objective (ID): Prepare for future flooding as a result of climate change in
Luncarty (Ref: 2472)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in this
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with ongoing projects and activities. This will include
engaging with the community on the development of the flood
study.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 24703)
Objective (ID): Prepare for future flooding as a result of climate change in
Luncarty (Ref: 2472)
Delivery Lead: Scottish Water
Status: Planned Planned Delivery Period: 2025-2027
Page 254 of 354

Page 255

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 88 
Return to Contents Page
Description:
Scottish Water will undertake a modelling assessment in the Perth
City sewer catchment to improve knowledge and understanding of
flood risk in this area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Scottish Water will coordinate this action with Perth and Kinross
Council and SEPA. Outputs of this modelling assessment will be
shared with Perth and Kinross Council and SEPA
Funding
Arrangement:
Funding for this action is secured within Scottish Water's business
plan. 
Page 255 of 354

Page 256

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 89 
Return to Contents Page
3.11 Scone - PVA 02/08/11 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council Annaty Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Scone.
The main source of flooding is the Annaty Burn and surface water. There is a history
of flooding in this area, with recent floods caused by both river and surface water
flooding. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Scone   Target Area 255  
Page 256 of 354

Page 257

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 90 
Return to Contents Page 
Scone (Objective Target Area 255) 
Summary Location Map
Scone is a town northeast of Perth
located within Perth and Kinross. 
The main source of flooding is surface
water and river flooding from the
Annaty Burn. There are approximately
330 people and 180 homes and
businesses currently at risk from
flooding. This is likely to increase to
400 people and 220 homes and
businesses by the 2080s due to
climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by a previous
flood study for the Annaty Burn, while the national understanding of surface water
flooding was improved by Scottish Water’s sewer flood risk assessment.
There has been a history of flooding in this area. In August 2004 high intensity
rainfall resulted in flooding to a number of properties and the Annaty Burn
overtopped. A series of small-scale localised floods in Scone were recorded in 2010,
2013 and 2014. In May 2017, heavy rainfall led to several roads in the area being
flooded. Heavy rain on 11 and 12 August 2020 led to surface water flood water
outside some properties to rise up to the level of airbricks. The most recent flood was
recorded February 2021 when multiple areas across Perth and Kinross were
affected, including Scone. 
Objectives and Actions in the Scone Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Page 257 of 354

Page 258

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 91 
Return to Contents Page 
Action (ID): FLOOD PROTECTION SCHEME (Ref: 25501)
Objective (ID): Reduce the risk of surface water and river flooding from the
Annaty Burn in Scone (Ref: 2554)
Delivery Lead: Perth & Kinross Council
Status: Not started Planned Delivery Period: To be confirmed
Description:
A flood protection scheme has been proposed to address the risk
of river flooding to the Goshenbank Park and Burnside area in
Scone from the Annaty Burn. The preferred option consists of
raising existing footbridges and constructing riverside defences.
The scheme would provide a 1 in 200-year standard of flood
protection. 
The commencement of the work to develop the scheme has been
delayed. The development of the proposals will be informed by
community engagement. The scheme will then progress to the
statutory process set out under the Flood Risk Management
(Scotland) Act 2009. The detailed design will be completed
thereafter. 
Following completion of the detailed design, the proposed scheme
will be procured and will progress to construction. 
As built drawings will be made available to SEPA, for inclusion in
the Scottish Flood Defence Asset Database, flood map updates
and flood warning scheme updates.
Coordination
Arrangement:
The Scone (Annaty Burn) Flood Protection Scheme will be
coordinated through the Tay Local Plan District Partnership. The
flood protection scheme will be coordinated with other related
actions.
Funding
Arrangement:
The delivery of the Annaty Burn Flood Protection Scheme is
subject to capital funding being made available (up to 80% capital
grant funding from the Scottish Government with the remaining
funding being provided from Perth & Kinross Council's capital
programme). 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 25502)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of Scone (Annaty Burn) Flood Protection
Scheme (Ref: 2552)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: To be confirmed
Description:
Once built, Perth and Kinross Council will implement an inspection
and maintenance regime for the Scone (Annaty Burn) Flood
Protection Scheme.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership will
maintain any existing flood protection scheme through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
Page 258 of 354

Page 259

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 92 
Return to Contents Page
landowners and other stakeholders as required. The maintenance
of the flood scheme will also be coordinated with related actions.
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth and Kinross Council revenue budget. 
Action (ID): FLOOD STUDY (Ref: 25503)
Objective (ID): Reduce the risk of surface water and river flooding from
the Annaty Burn in Scone (Ref: 2554)
Delivery Lead: Perth and Kinross Council
Status: Not Started Planned Delivery Period: 2023 - 2024
Description:
A flood protection study was carried out by Perth and Kinross
Council for the Annaty Burn, Scone in 2007. The study identified a
viable flood protection scheme as a priority in the first flood risk
management cycle. Further study was recommended to
supplement the previous investigations, looking at natural flood
management and surface water flooding. Natural flood
management options that should be considered include river/
floodplain restoration and sediment management. The study will
also investigate the viability of property level protection. The study
will take a catchment approach and consider the potential benefits
and disbenefits and interaction between actions upstream and
downstream. 
Perth and Kinross Council also carried out a flood protection study
for the barrel drain in Scone in 2007 which did not identify a viable
flood protection scheme. However, the Perth and Kinross Council
intends to re-examine this previous study following a small number
of drain failures and this will be carried out in conjunction with the
study identified above
Coordination
Arrangement:
The study is scheduled to commence in the 2022/23 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the flood risk and identify potential options for
managing that risk. This action will be undertaken in conjunction
with the Scone surface water management plan (Action Ref
25504).
The study will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 25504)
Objective(ID): Reduce the risk of surface water and river flooding from
the Annaty Burn in Scone (Ref: 2554).
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023 - 2024
Description: Perth & Kinross Council will engage consulting engineers to
develop a surface water management plan for Scone. This will
Page 259 of 354

Page 260

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 93 
Return to Contents Page
investigate the surface water flood risk and identify potential
options for managing that risk.
The surface water management plan will be delivered as part of
the Scone Flood Study (Action Ref 25503). 
Scottish Water will provide local knowledge and understanding of
the sewer network. This includes Scottish Water corporate data
(as applicable) and, where available, outputs of Section 16 or
integrated catchment studies, to assist with the surface water
management planning process.
Coordination
Arrangement:
The surface water management plan is scheduled to commence in
the 2022/23 financial year and will be coordinated through the Tay
Local Plan District Partnership.
Scottish Water will support surface water management planning
through ensuring that best available knowledge and data is used
to input into the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID):  COMMUNITY ENGAGEMENT (Ref: 25505)
Objective (ID): Prepare for current flood risk and future flooding in Scone as a
result of climate change (Ref: 2553)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with on-going projects and activities. 
Perth and Kinross Council will continue to coordinate with Scone
Community Council and local landowners on a priority needs basis
where resources allow. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Page 260 of 354

Page 261

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 94 
Return to Contents Page
3.12 Perth & Almondbank - PVA 02/08/12 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to
Almondbank, Methven and Perth. The main source of flooding in Almondbank and
Methven is river flooding. The main sources of flooding in Perth are small
watercourses and surface water. Perth and Almondbank benefit from flood protection
schemes. There is a long history of flooding in these areas, with recent flooding from
surface water and small watercourses recorded in August 2020.   
List of Objective Target Areas 
There are three target areas in this potentially vulnerable area, which have been the
focus of further assessment, these are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Almondbank   Target Area 187
Methven   Target Area 249
Perth    Target Area 253  
Page 261 of 354

Page 262

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 95 
Return to Contents Page 
Almondbank (Objective Target Area 187) 
Summary Location Map
Almondbank is located approximately
5km northwest of Perth on the banks
of the River Almond within Perth and
Kinross. 
The main source of flooding in
Almondbank is river flooding. The
recent Almondbank Flood Protection
Scheme protects approximately 31
homes and 48 businesses on the
River Almond and the East Pow Burn
up to the 1 in 200-year flood. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is improved by previous flood
study work for the Almondbank Flood Protection Scheme.
There is a long record of flooding in this area. Previous significant flooding occurred
in January 1993, September and December 1999 and January 2011. The most
recent flood was recorded in December 2015 due to Storm Desmond when the River
Almond overflowed causing erosion to the riverbank. The Almondbank Flood
Protection Scheme was substantially completed in 2018 and protects homes and
businesses from flooding in the area. In August 2020, some minor surface water
flooding was recorded at the Lochty Industrial Estate. In September 2022, heavy
rainfall resulted in the River Almond flooding onto the adjacent football pitch,
affecting the road access to the bowling club. No properties were affected. 
Objectives and Actions in the Almondbank Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Page 262 of 354

Page 263

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 96 
Return to Contents Page 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 18701)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of Almondbank and Perth flood protection
schemes (Ref: 1872)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the Almondbank Flood Protection Scheme on the
River Almond and East Pow Burn will continue in accordance with
the existing inspection and maintenance regime
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes through a programme
of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's Revenue Budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 18702)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Almondbank (Ref: 1873)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
SEPA will maintain the Almond flood warning scheme.
Coordination
Arrangement:
SEPA will maintain the Almond flood warning service. SEPA will
continue to raise awareness of flood warning, and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Page 263 of 354

Page 264

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 97 
Return to Contents Page
Methven (Objective Target Area 249) 
Summary Location Map
Methven is a village which lies due
west of Perth within Perth and
Kinross. 
The main source of flooding in
Methven is river flooding, with some
risk from surface water flooding. There
are approximately 50 homes and
businesses currently at risk of
flooding. This is likely to increase to
60 homes and businesses by 2080
due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources, and this information has highlighted the risk of flooding in this area.
There are records of flooding in this area. Flooding occurred in January and July
2002, July 2005, July 2010 and November 2012. In August 2020 when heavy rain led
to flooding of approximately 4 properties and roads. The most recent flooding
occurred in September 2022 when two properties are understood to have flooded. 
Objectives and Actions in the Methven Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD STUDY (Ref: 24901)
Objective (ID): Reduce the risk of river flooding from the Methven Burn in
Methven (Ref: 2493).
Delivery Lead: Perth & Kinross Council
Status: Not started Planned Delivery Period: 2026-2028
Page 264 of 354

Page 265

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 98 
Return to Contents Page
Description:
A flood study is required to improve understanding of river
flood risk. The study will include flood modelling. If flood risk
is confirmed, potential options to manage flood risk should be
investigated. Current and long-term flood risk will be
considered and include the assessment of the potential
impacts of climate change.
Coordination
Arrangement:
The study is programmed to commence in the 2026/27
financial year. Perth and Kinross Council will engage a
consulting engineer to investigate the fluvial flood risk and
identify potential options for managing that risk.
The study will be coordinated through the Tay Local Plan
District Partnership and with other related actions.
Funding
Arrangement:
The flood study will be subject to funding from Perth and
Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 24902)
Objective (ID): Prepare for current flood risk and/or future flooding as a result
of climate change in Methven (Ref: 2492)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise
awareness of flood risk. Community engagement activity will
continue in connection with on-going projects and activities.
This will include engaging with the community on the
development of the flood study.
Coordination
Arrangement:
Community engagement will take place around any projects
and activities and will be coordinated through the Tay Local
Plan District Partnership. Information will be disseminated
through website, social media and other community
engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding
from Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by the Scottish
Government through SEPA’s grant in aid settlement. 
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Page 265 of 354

Page 266

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 99 
Return to Contents Page
Perth (Objective Target Area 253) 
Summary Location Map
The city of Perth is located on the
River Tay within Perth and Kinross.
The main source of flooding in Perth is
river flooding, however there is also a
risk from surface water. It should be
noted that Perth Flood Protection
Scheme reduces the risk of river and
coastal flooding in Perth. There are
approximately 4,000 people and 2,600
homes and businesses currently at
risk of flooding. This is likely to
increase to 9,300 people and 5,500
homes and businesses by the 2080s
due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is improved by previous flood
studies carried out by the local authority for the Perth Flood Protection Scheme and
the on-going Craigie Burn flood study and Perth surface water management plan.
Understanding of sewer, river and surface water flooding was also improved as a
result of the Perth integrated catchment study which assessed the interactions
between the different flood sources.
There is a long record of flooding in this area, and most recently from surface water.
Significant damage occurred in 1993 when widespread flooding resulted in damage
to communication networks, hundreds of properties and farmland in and around
Perth, causing an estimated £20 million of damage. Residents were evacuated in the
North Muirton housing estate after flood defences were breached. Numerous surface
water floods were recorded in the area too, including on 21 July 2010 when
extensive surface water flooding around Perth affected properties and roads and 16
July 2011 when heavy rain caused surface water flooding in Perth. Homes and
businesses were affected. In June 2017 drains overflowed as a result of heavy
rainfall, flooding properties and several gardens and roads. Recently, on 11 and 12
August 2020 heavy rainfall caused widespread flooding in Perth flooding
approximately 155 homes and businesses across the city. In September 2022
Page 266 of 354

Page 267

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 100 
Return to Contents Page
flooding occurred throughout Perth and Kinross, with approximately 40 properties
were flooded in Perth. 
Objectives and Actions in the Perth Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): FLOOD PROTECTION WORKS (Ref: 25301)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: To be confirmed
Description:
The design of the proposed Bridgend surface water flood
protection works has commenced. The proposed works include a
high-capacity drainage channel and outfall to the River Tay. 
Following completion of the design, the Bridgend surface water
flood protection works will be procured and constructed. As built
drawings will be made available to SEPA, for inclusion in the
Scottish Flood Defence Asset Database, flood map updates and
flood warning scheme updates. 
In accordance with the Tay flood risk management plan, as part
of the scheme or works, Perth and Kinross Council will aim to
ensure the action will not have an adverse effect on the integrity
of the River Tay Special Area of Conservation.
Coordination
Arrangement:
The Bridgend surface water flood protection works will be
coordinated through the Tay Local Plan District Partnership,
taking cognisance of the on-going Perth surface water
management plan.
Funding
Arrangement:
The delivery of the Bridged Flood Protection Works is subject to
capital funding being made available (up to 80% capital grant
funding from the Scottish Government with the remaining funding
being provided from Perth & Kinross Council's capital
programme). 
Action (ID): FLOOD STUDY (Ref: 25302)
Objective (ID): Reduce the risk of river flooding from the Craigie Burn in Perth
(Ref: 2534)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: 2021 - 2023
Description:
Perth and Kinross Council has engaged consulting engineers to
complete the Craigie Burn Flood Protection Study as set out in
the Cycle 1 Tay local flood risk management plan.
Page 267 of 354

Page 268

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 101 
Return to Contents Page
Coordination
Arrangement:
The flood study commenced in November 2021 and is on-going.
The consulting engineers are investigating the fluvial flood risk
and the potential actions required to manage and, where
achievable, to reduce that risk. The study is being coordinated
through the Tay Local Plan District Partnership and with the on-
going Perth surface water management plan.
Funding
Arrangement:
The flood study is being funded from Perth and Kinross Council’s
revenue budget. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 25303)
Objective (ID): Reduce the risk of surface water flooding in Perth. (Ref: 2535)
Delivery Lead: Scottish Water
Status: Not started Planned Delivery Period: 2025 - 2027
Description:
Scottish Water will undertake a modelling assessment in the
Perth City sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
The outputs of the modelling assessment will be shared with
Perth and Kinross Council and SEPA.
Funding
Arrangement:
Funding for this action is secured within Scottish Water's
business plan. 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 25304)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: 2021 - 2023
Description:
Perth and Kinross Council has engaged consulting engineers to
develop the Perth Surface Water Management Plan. They are
further investigating the surface water flood risk across Perth to
identify potential options for managing that risk. The results of
Scottish Water’s sewer flood risk assessment and the Perth
Integrated Catchment Study are being considered. Current and
long-term flood risk is being considered and if climate change
impacts are found to be significant, then an adaptation plan will
be included. Perth is a Scottish Water priority area and
opportunities to work jointly will be explored.
Coordination
Arrangement:
Development of the surface water management plan commenced
in December 2021 and is on-going, and is being coordinated
through the Tay Local Plan District Partnership.
This is a priority area for Scottish Water, who are working with
and supporting surface water management planning through
ensuring that best available knowledge and data is used to input
into the surface water management plan.
Funding
Arrangement:
The surface water management plan is being funded from Perth
and Kinross Council’s revenue budget.
Page 268 of 354

Page 269

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 102 
Return to Contents Page 
Action (ID): FLOOD STUDY (Ref: 25305)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Scottish Water in coordination with Perth and Kinross Council
Status: Existing Planned Delivery Period: 2020 - 2023
Description:
The Perth Integrated Catchment Study identified a number of
flooding hotspots in Perth. These areas include Feus Road,
Cavendish Avenue, Marshall Place, South Street and Bells
Sports Centre. Scottish Water and Perth and Kinross Council will
continue to progress study work to identify options to manage
flood risk in the future.
The study will outline potential solutions and phasing of solutions
to reduce flood risk from the sewer network and surface water in
the Cavendish Avenue/Gray Street area of Perth. The remaining
study outputs will be assessed by all parties to identify whether
any works will be economically viable and affordable to be taken
forwards. Due to the cost of the and scale of options, it is likely
that any viable improvements would be delivered in a phased
manner over a number of FRM cycles.
Coordination
Arrangement:
The study has commenced and is expected to be completed in
2023. The results from the Feus Road elements of the study were
disseminated to the local community in November 2022. Other
areas will follow.
Scottish Water will continue to work with Perth and Kinross
Council to investigate the sewer and pluvial flood risk in the noted
high priority areas and identify potential options for managing that
risk. The study is being coordinated through the Tay Local Plan
District Partnership.
Funding
Arrangement:
The study is being funded from Perth and Kinross Council’s
revenue budget.
Funding for this action is secured within Scottish Water's
business plan. 
Funding for any potential future phases of work is not confirmed. 
Action (ID): FLOOD STUDY (Ref: 25306)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023 - 2024
Description:
The Perth Integrated Catchment Study identified a number of
flooding hotspots in Perth. The highest priority areas are currently
being studied under a joint project run by Scottish Water in
partnership with Perth and Kinross Council (Action Ref: 25305).
Scottish Water and Perth and Kinross Council should progress
further study work for the remaining hotspots to identify options to
manage flood risk in the future.
Page 269 of 354

Page 270

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 103 
Return to Contents Page
Coordination
Arrangement:
The study is programmed to commence in 2023. Perth and
Kinross Council will engage a consulting engineer to investigate
the surface water flood risk and identify potential options for
managing that risk. The study will be coordinated with Scottish
Water through the Tay Local Plan District Partnership and with
the on-going Perth Surface Water Management Plan (Action Ref:
25304). 
This is a priority area for Scottish Water, who will work with and
support the Council through ensuring that best available
knowledge and data is used to input into the study.
Funding
Arrangement:
The study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 25307)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in the area
by SEPA and the responsible authorities to raise awareness of
flood risk. Community engagement activity will continue in
connection with on-going projects and activities. 
Perth and Kinross Council will continue to coordinate with the
Local Resilience Partnership’s Community and Business
Resilience Group and other community resilience groups on a
priority needs basis where resources allow.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUPS (Ref: 25308)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Page 270 of 354

Page 271

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 104 
Return to Contents Page
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Perth Community and Business Resilience Group and the
South Inch Flood Group are active in this area. Perth and Kinross
Council will continue to communicate and support these groups
on flood risk matters. Their resilience plans should be reviewed
and updated regularly by the groups, and this will be supported
by the Council.
Coordination
Arrangement:
Perth and Kinross Council will continue to coordinate with the
Perth Business Community Resilience Group and the South Inch
Flood Group to manage flood risk, improve preparedness and
increase resilience against flooding. The Council will continue to
co-ordinate with these groups on a priority needs basis where
resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 25309)
Objective(ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of the Perth Flood Protection Scheme (Ref:
2532)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the Perth Flood Protection Scheme on the River
Tay and the Craigie Burn should continue in accordance with the
existing inspection and maintenance regime.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership will
maintain any existing flood protection scheme through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 25310)
Objective(ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
SEPA should maintain the Almond flood warning scheme.
Page 271 of 354

Page 272

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 105 
Return to Contents Page 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 25311)
Objective(ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
SEPA should maintain the River Tay flood warning scheme.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Coordination
Arrangement:
SEPA will maintain the River Almond flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Page 272 of 354

Page 273

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 106 
Return to Contents Page
3.13 Comrie - PVA 02/08/13 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council,
Stirling Council River Earn 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Comrie.
The main source of flooding is the River Earn, River Lednock and the Water of
Ruchill. There is also risk of flooding from surface water. There is a history of
flooding with significant floods recorded in 2015 and 2016 during Storm Frank. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This area is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Comrie  Target Area 213  
Page 273 of 354

Page 274

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 107 
Return to Contents Page 
Comrie (Objective Target Area 213) 
Summary Location Map
Comrie is located to the east of Loch
Earn within Perth and Kinross. 
The main source of flooding in Comrie
is river flooding from the Water of
Ruchill, the River Earn and the River
Lednock. There is also risk of surface
water flooding. The local authority has
carried out a flood study in this area
which estimated that there are
approximately 191 homes and 2
businesses currently at risk from
flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the studies
supporting the on-going development of the proposed Comrie Flood Protection
Scheme. The national understanding of surface water flooding was also improved by
Scottish Water’s sewer flood risk assessment.
There is a long record of flooding in this area. In August 2012, approximately 60
properties in Dalginross were flooded by the Water of Ruchill. In November 2012 the
Water of Ruchill flooded again, inundating approximately 150 homes. In January
2016 the fire service was called to attend a localised flooding issue. The most recent
flood occurred in February 2021 however no properties were affected. 
Objectives and Actions in the Comrie Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 274 of 354

Page 275

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 108 
Return to Contents Page
Action (ID): FLOOD PROTECTION SCHEME (Ref: 21301)
Objective(ID): Reduce the risk of river flooding from the River Earn, River
Lednock and the Water of Ruchill in Comrie (Ref: 2134)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: 2022 - 2024
Description:
The Comrie Flood Protection Scheme was confirmed under the
Flood Risk Management (Scotland) Act on 18 August 2021. The
detailed design of the flood scheme  is on-going and once
complete, the flood scheme is to be built.
Advance works commenced in August 2022 and are on-going.
The detailed design of the flood scheme is to be completed,
followed by procurement and construction. The development of
the proposals will continue to be informed by community
engagement. 
Once complete, as built drawings will be made available to
SEPA, for inclusion in the Scottish Flood Defence Asset
Database, flood map updates and flood warning scheme updates.
Coordination
Arrangement:
The Comrie Flood Protection Scheme is being coordinated
through the Tay Local Plan District Partnership. SEPA will work
with Perth and Kinross Council on the potential to coordinate this
action with an update to SFDAD and flood warning actions.
Funding
Arrangement:
The Comrie Flood Protection Scheme will be subject to available
capital funding (up to 80% capital grant funding from the Scottish
Government with the remaining funding being provided from Perth
& Kinross Council's capital programme). 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 21302)
Objective (ID): Reduce the risk of surface water flooding in Comrie (Ref: 2133)
Delivery Lead: Scottish Water
Status: Not started Planned Delivery Period: 2025 - 2027
Description:
Scottish Water will undertake a modelling assessment in the
Comrie sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Outputs of this modelling assessment will be shared with local
authorities and SEPA.
Funding
Arrangement:
Funding for this action is secured within Scottish Water's business
plan. 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 21303)
Objective (ID): Reduce the risk of surface water flooding in Comrie (Ref: 2135)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023 - 2025
Page 275 of 354

Page 276

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 109 
Return to Contents Page
Description:
Perth & Kinross Council will engage consulting engineers to
develop a surface water management plan for Comrie. This will
investigate the surface water flood risk and identify potential
options for managing that risk. The results of the sewer flood risk
assessment will be considered. Current and long-term flood risk
will be assessed and if climate change impacts are found to be
significant, surface water management should include adaptive
planning.
Coordination
Arrangement:
The surface water management plan is programmed to
commence in the 2023/24 financial year and will be coordinated
through the Tay Local Plan District Partnership. 
Scottish Water support surface water management planning
through ensuring that best available knowledge and data is used
to input to the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 21304)
Objective (ID): Prepare for current flood risk and/or future flooding as a result of
climate change in Comrie (Ref: 2133)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Perth and Kinross Council will continue to coordinate with the
Comrie Community Resilience Group on a priority needs basis
where resources allow.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 21305)
Objective (ID): Prepare for current flood risk and/or future flooding as a result of
climate change in Comrie (Ref: 2133)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Page 276 of 354

Page 277

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 110 
Return to Contents Page
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Comrie Community Resilience Group operates in this area.
Perth and Kinross Council will continue to communicate and
support the group on flood risk matters. The resilience plan
should be reviewed and updated regularly by the group, and this
will be supported by the Council.
Coordination
Arrangement:
Perth and Kinross Council will continue to coordinate with the
Comrie Community Resilience Group to manage flood risk,
improve preparedness and increase resilience against flooding.
The Council will continue to co-ordinate with the group on a
priority needs basis where resources allow. 
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 21306)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of the flood protection scheme in Comrie (Ref:
2132)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Perth and Kinross Council will continue to maintain existing flood
defences and flood protection works in Comrie in accordance with
the existing inspection and maintenance regime. These include
the Water of Ruchill Flood Protection Scheme constructed in the
1960s and flood protection works carried out in 2013. 
Once built, Perth and Kinross Council will implement an
inspection and maintenance regime for the Comrie Flood
Protection Scheme
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes and works through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 21307)
Objective (ID): Prepare for current flood risk and/or future flooding as a result of
climate change in Comrie (Ref: 2133)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Page 277 of 354

Page 278

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 111 
Return to Contents Page
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
SEPA should maintain the Comrie flood warning scheme.
Coordination
Arrangement:
SEPA will work with Perth & Kinross Council on the potential to
use information from the Comrie flood scheme to inform on-going
flood warning. SEPA will continue to raise awareness of flood
warning and engage with communities about the service when
required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Page 278 of 354

Page 279

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 112 
Return to Contents Page
3.14 Bridge of Earn - PVA 02/08/14 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Earn 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Bridge of
Earn. The main source of flooding is river flooding from the River Earn, Deich Burn
and Yellow Burn. A flood protection scheme offers some protection against flooding
in this area. There is also risk of surface water flooding. There is history of flooding in
this area, with recent flooding recorded in 2015, 2016, and 2020. 
List of Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This area is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Bridge of Earn  Target Area 205  
Page 279 of 354

Page 280

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 113 
Return to Contents Page 
Bridge of Earn (Objective Target Area 205) 
Summary Location Map
The town of Bridge of Earn is located
on the River Earn within Perth and
Kinross. 
The main source of flooding in Bridge
of Earn is river flooding, however
there is also a risk of surface water
flooding. There are approximately 290
people and 150 homes and
businesses at risk from flooding. This
is likely to increase to 340 people and
180 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk   
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river and surface water flooding was improved
by the Perth integrated catchment study which has assessed the interactions
between sewer, river and surface water flooding.
There is a long record of flooding in this area. The town was affected by flooding in
February 1990 and January 1993. In December 2015, Storm Desmond caused
prolonged rainfall across Perth & Kinross, affecting several properties in Bridge of
Earn. In June 2016 intense rainfall caused flooding to homes, roads and a local
school. In August 2020, heavy rain flooded one property and some roads. The most
recent flooding occurred in September 2022 when surface water flooding affected
four properties. 
Objectives and Actions in the Bridge of Earn Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Page 280 of 354

Page 281

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 114 
Return to Contents Page 
Action (ID): FLOOD STUDY (Ref: 20501)
Objective (ID): Reduce the risk of surface water flooding in Bridge of Earn (Ref:
2054)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023-2025
Description:
A flood study will be carried out in order to better understand the
integrated flooding mechanisms in Bridge of Earn. The study will
initially include a high-level assessment of actions and then
consider the works required to reduce flood risk in the future. The
results of the recent Perth Integrated Catchment Study will be
incorporated. Current and long-term flood risk will be considered.
Coordination
Arrangement:
The study is programmed to commence in the 2023/24 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the flood risk and identify potential options for
managing that risk.
The study will be coordinated through the Tay Local Plan District
Partnership.
Scottish Water will provide local knowledge and understanding of
the sewer network. This includes Scottish Water corporate data
(as applicable) and, where available, outputs of the Section 16
sewer assessment and/or Perth integrated catchment study.
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 20502)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Bridge of Earn (Ref: 2053)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in the area
by SEPA and the responsible authorities to raise awareness of
flood risk. Community engagement will continue in connection
with any on-going projects and activities. 
Perth and Kinross Council will continue to coordinate with Bridge
of Earn Community Council and other groups on a priority needs
basis where resources allow.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
the Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
Page 281 of 354

Page 282

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 115 
Return to Contents Page
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 20503)
Objective (ID): Reduce the risk of surface water flooding in Bridge of Earn (Ref:
2054)
Delivery Lead: Scottish Water
Status: Not started Planned Delivery Period: 2025-2027
Description:
Scottish Water will undertake a modelling assessment in the
Perth City sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Outputs of this modelling assessment will be shared with local
authorities and SEPA.
Funding
Arrangement:
Funding for this action is secured within Scottish Water's business
plan. 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 20504)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of the Bridge of Earn Flood Protection Scheme
(Ref: 2052)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the Bridge of Earn Flood Protection Scheme on
the River Earn, the Deich Burn and the Yellow Burn will continue
in accordance with the existing inspection and maintenance
regime.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes through a programme
of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required.
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's Revenue Budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 20505)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Bridge of Earn (Ref: 2053)
Delivery Lead: SEPA
Status: Existing  Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
SEPA will maintain the Earn flood warning scheme.
Page 282 of 354

Page 283

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 116 
Return to Contents Page
Coordination
Arrangement:
SEPA will work with Perth and Kinross Council on the potential to
use information from the flood study to inform ongoing flood
warning. SEPA will continue to raise awareness of flood warning
and engage with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Page 283 of 354

Page 284

Tay Local Flood Risk Management Plan 
Chapter 3 | 117 
Return to Contents Page
3.15 Other Flood Risk Activities by Local Authorities in the Tay Local Plan
District 
This Local Flood Risk Management Plan presents the actions to manage flood risk in
the Tay Local Plan District. These actions are at a LPD-wide scale or are targeted at
specific Potentially Vulnerable Areas. In addition to the actions in this Plan,
responsible authorities are undertaking other activities to manage flood risk as
included in the Flood Risk Management (Scotland) Act 2009. The main activities that
have a significant effect and should be considered in conjunction with the Plan are
summarised as follows: 
Surface Water Management Planning 
As described in paragraph 1.8 of this Plan, surface water flooding occurs in areas of
the Tay Local Plan District. This will be addressed by Surface Water Management
Planning. Details of the Surface Water Management Planning for each local authority
in the Local Plan District are included in Annex 5 of this Plan. 
Section 18 & 59: Works of Clearance and Repair 
Based on an assessment of the condition of a body of water, local authorities must
prepare a schedule of clearance and repair works that would substantially reduce the
risk of flooding of land. This is commonly referred to as a Schedule 18, which is
made available by each local authority within the Local Plan District for public
inspection. Under Section 59 of the Flood Risk Management (Scotland) Act, a local
authority must carry out the works in the Schedule 18 if it considers that this will
contribute to (or will not affect) the implementation of actions in this Plan. Details of
how to access Schedule 18’s for each local authority in the Local Plan District are
included in Annex 5 of this Plan. 
Section 56: General Power to manage flood risk 
Without affecting the implementation of actions in this Plan, a local authority may do
anything which it considers will contribute to the implementation of actions in this
Plan or is necessary to reduce the risk of a flood which is likely to occur imminently
and have serious adverse consequences for human health, the environment, cultural
heritage or economic activity in its area. 
This may include carrying out flood protection works, which may not be identified as
actions in this Plan. Where a local authority has a commitment to carry out such
flood protection works or any other activities within the period of the current FRM
cycle not included as actions in this Plan, then these works are identified in Annex 5
of this Plan.
Page 284 of 354

Page 285

Tay Local Flood Risk Management Plan 
Chapter 3 | 118 
Return to Contents Page 
3.16 Next Steps and Monitoring Progress 
This Plan will run for six years from 2022. Over this period the Tay Local Plan District
partnership will meet from time to time to monitor progress on implementing the
actions detailed in Section 3 of the Plan.
Between years two and three of the cycle (i.e. before December 2025), Perth and
Kinross Council, as lead local authority, will publish an interim report on the
conclusions of a review of the Plan, including information on the progress that has
been made towards delivering the actions identified in the Plan. 
Between years five and six of the cycle (i.e. before June 2028), Perth and Kinross
Council, as lead local authority. will publish a final report on the Plan containing an
assessment of the progress made towards delivering the “current actions”, a
summary of the actions not implemented, with reasons why, and a description of any
other actions undertaken since the plan was finalised, which the lead local authority
considers have contributed to the achievement of the objectives in the Plan. 
Perth and Kinross Council will make these reports available for public inspection. 
Page 285 of 354

Page 286

Tay Local Flood Risk Management Plan 
Annex 1 | 119 
Annex 1: Tay LPD Roles, Responsibilities & Contact Details
Roles and responsibilities for Flood Risk Management Planning 
Individuals are the first line of defence against flooding. However, public bodies have
responsibilities too and are working together to reduce the impacts of flooding in
Scotland. Responsibility for flood risk management planning falls in the main to
SEPA, local authorities and Scottish Water. However, individuals have a personal
responsibility to protect themselves and their property. 
Some of the key roles are outlined below and more information is available from the
SEPA website. 
Your Responsibilities 
Organisations and individuals have responsibilities to protect themselves from
flooding. Being prepared by knowing what to do and who to contact if flooding
happens can help you reduce the damage and disruption flooding can have on your
life. 
The first step to being prepared is signing up to Floodline so you can receive
messages to let you know where and when flooding is likely to happen. Other useful
tools and advice on how to be prepared are available on the Floodline website
including a quick guide to who to contact in the event of a flood. You can also check
how your area could be affected by flooding by looking at SEPA’s flood maps. 
SEPA 
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk
management authority. We have a statutory duty to produce Scotland's Flood Risk
Management Strategies. As described above, we work closely with other
organisations responsible for managing flood risk through a network of partnerships
and stakeholder groups to ensure that a nationally consistent approach to flood risk
management is adopted. 
SEPA also has a responsibility to identify where in Scotland there is the potential for
natural flood management techniques to be introduced. Natural flood management is
the use of the natural features of the land to store and slow down the flow of water.
In running Floodline, we provide live flooding information and advice on how to
prepare for or cope with the impacts of flooding 24 hours a day, seven days a week.
To help us forecast for flooding we work closely with the Met Office. 
To raise awareness of flooding at a national level SEPA runs education initiatives,
community engagement programmes and an annual campaign to promote the useful
Page 286 of 354

Page 287

Tay Local Flood Risk Management Plan 
Annex 1 | 120 
advice and information available through Floodline. We work in partnership with local
authorities, Neighbourhood Watch Scotland, Ready Scotland and others to share our
resources and help to promote preparedness and understanding of how flood risk is
managed. 
SEPA can be contacted as follows:
Telephone: 03000 99 66 99
E-mail:  frmplanning@sepa.org 
Address: Strathallan House Castle Business Park Stirling, FK9 4TZ 
Local Authorities 
Local authorities work together for flood risk management planning purposes through
a single lead authority which has the responsibility for producing the Local Flood
Risk Management Plan. Local authorities have been working collaboratively in the
manner described above to develop these. 
It is the responsibility of your local authority to implement its flood protection actions
agreed within the Flood Risk Management Strategy, including new schemes or
works and the requirement to carry out clearance and repair works on bodies of
water. You can help your local authority to manage flooding by letting them know if
debris is blocking watercourses or if flood defences are tampered with.
During severe flooding, local authorities will work with the emergency services and
coordinate shelter for people evacuated from their homes.
The lead authority for the Tay Local Plan District is Perth & Kinross Council. Other
local authorities who are responsible authorities for the Tay Local Plan District are: 
• Angus Council;
• Fife Council;
• Stirling Council. 
Contact details are provided below. 
Local
Authority Telephone E-mail Address
Perth & Kinross
Council
01738 475000 Flood@pkc.gov.uk  Pullar House
35 Kinnoull Street
Perth PH1 5GD
Angus
Council
03452 777 778 Accesline@angus.gov.uk Orchardbank
Business Park, 
Orchardbank, 
Forfar, 
Angus DD8 1AX
Fife
Council
03451 550000 fife.council@fife.gov.uk Fife Council
Fife House,
Page 287 of 354

Page 288

Tay Local Flood Risk Management Plan 
Annex 1 | 121 
North Street,
Glenrothes 
KY7 5LT
Stirling Council 01786 404040 http://my.stirling.gov.uk/contact 
(online form)
Flooding Team, 
Stirling Council, 
Endrick House, 
Kerse Road, 
Stirling FK7 7SZ 
Scottish Water 
Scottish Water is a responsible authority for flood risk management and is working
closely with SEPA, local authorities and others to coordinate plans to manage flood
risk. Scottish Water has the public drainage duty and is responsible for foul drainage
and the drainage of rainwater run-off from roofs and any paved ground surface from
the boundary of properties. Additionally, Scottish Water helps to protect homes from
flooding caused by sewers either overflowing or becoming blocked. Scottish Water is
not responsible for private pipework or guttering within the property boundary.
Scottish Water can be contacted on 0800 0778 778. 
National Parks 
The two National Park Authorities, Loch Lomond and Trossachs National Park and
Cairngorms National Park, are the Planning Authorities for their respective areas and
were designated as responsible authorities for flood risk management purposes in
2012. Both have worked with SEPA, local authorities and Scottish Water to help
develop Flood Risk Management Strategies and Local Flood Risk Management
Plans. As planning authorities they fulfil an important role in land use planning,
carrying out or granting permission for activities that can play a key role in managing
and reducing flood risk. The Loch Lomond and Trossachs National Park and the
Cairngorms National Park are responsible authorities with the Tay Local Plan
District. 
Contact details are provided below. 
National Park
Authority Telephone E-mail Address
Loch Lomond
& Trossachs
01389 722 600 info@lochlomond-trossachs.org  Carrochan, 
Carrochan Road,
Balloch, G83 8EG
Cairngorms 01479 873 535 planning@cairngorms.co.uk  14 The Square,
Grantown-on-Spey
PH26 3HG 
Page 288 of 354

Page 289

Tay Local Flood Risk Management Plan 
Annex 1 | 122 
Other organisations
• The Scottish Government oversees the implementation of the Flood Risk
Management (Scotland) Act 2009 which requires the production of Flood Risk
Management Strategies and Local Flood Risk Management Plans. Scottish
Ministers are responsible for setting the policy framework for how organisations
collectively manage flooding in Scotland. The Scottish Government has also
approved the Tay Flood Risk Management Strategy.
• Scottish Natural Heritage has provided general and local advice in the
development of the Flood Risk Management Strategies. Flooding is seen as a
natural process that can maintain the features of interest at many designated
sites, so Scottish Natural Heritage helps to ensure that any changes to patterns
of flooding do not adversely affect the environment. Scottish Natural Heritage
also provides advice on the impact of Flood Protection Schemes and other land
use development on designated sites and species.
• Forestry and Land Scotland was designated in 2012 as a responsible authority
for flood risk management planning purposes and has engaged in the
development of the Flood Risk Management Strategies through national and
local advisory groups. This reflects the widely held view that forestry can play a
significant role in managing flooding. Forestry and Land Scotland can be
contacted as follows:
Tel:  03000 676 005 
Address: Upper Battleby, Redgorton,Perth, PH1 3EN
• During the preparation of the first flood risk management plans, Network Rail
and Transport Scotland have undertaken works to address flooding at a
number of frequently flooded sites. Further engagement is planned with SEPA
and local authorities to identify areas of future work. There is the opportunity for
further works to be undertaken during the first flood risk management planning
cycle although locations for these works are yet to be confirmed.
• Utility companies have undertaken site specific flood risk studies for their
primary assets and have management plans in place to mitigate the effects of
flooding to their assets and minimise the impacts on customers.
• The Met Office provides a wide range of forecasts and weather warnings. SEPA
and the Met Office work together through the Scottish Flood Forecasting
Service.
• The emergency services provide emergency relief when flooding occurs and
can coordinate evacuations. You should call the emergency services on 999 if
you are concerned about your safety or the safety of others and act immediately
on any advice provided.
• Historic Environment Scotland considers flooding as part of their regular site
assessments. As such, flooding is considered as one of the many factors which
Page 289 of 354

Page 290

Tay Local Flood Risk Management Plan 
Annex 1 | 123 
inform the development and delivery of its management and maintenance
programmes.
• The Scottish Flood Forum is a Scottish charitable organisation that provides
support for those who are affected by, or are at risk of, flooding. It provides flood
advice, information, awareness, education and training to individuals and
communities to help reduce the risk of flooding; in partnership with the local
authority, provides support during the recovery process following a flood incident
and aims to support the development of resilient communities. The Scottish
Flood Forum can be contacted as follows:
Tel:  01698 839 021
Web: www.scottishfloodforum.org
Address: Caledonian Exchange,19A Canning Street, Edinburgh, EH3 8HE
Page 290 of 354

Page 291

Tay Local Flood Risk Management Plan 
Annex 2 | 124 
Annex 2: Consultation and Engagement
It is essential that any action taken on flooding is informed by the best available data.
The 2009 Act therefore required that the draft Flood Risk Management Plans and
corresponding supplementary parts of Local Flood Risk Management Plans be put to
public consultation. SEPA and the lead local authorities were required to coordinate
their consultation arrangements during the preparation of these documents.
The purpose of the consultation was to seek views from everyone including
individuals, businesses and interested community groups at risk of flooding as well
as organisations with an interest in how flood risk is managed and delivered. This
Annex contains a summary of the responses made in the Tay Local Plan District and
explains how SEPA took these into account in preparing the Tay Flood Risk
Management Plan and also how they have taken them into account in preparing this
Tay Local Flood Risk Management Plan. 
The public consultation was delivered through a phased approach. Phase 1 (which
included a series of characterisation reports) commenced on 21 December 2021.
Phase 2 (which added initial objectives, a short list of measures and implementation
arrangements) commenced on 30 July 2021. The consultation closed on 31 October
2021.
The consultation was a web-based exercise carried out jointly with SEPA and the
other responsible authorities. The Citizen Space web-based platform was used to
host the consultation. Consultation questions were developed to stimulate a
response and respondents were also given the opportunity to make comment.
In order to encourage appropriate participation in the public consultation, Perth &
Kinross Council placed public notices in newspapers circulating in the Tay District
and the Council wrote to the other Responsible Authorities, Category 1 Responders,
SEPA, NatureScot and the national park authorities. The Council also wrote to
community councils and advertised the consultation online and through social media.
The other responsible authorities in the Tay District also followed similar
arrangements.
28 respondents made specific comments on the public consultation for the Tay Local
Plan District as follows:
Respondent No of Responses
Members of the public 22
Local businesses 1
Community bodies 1
Other organisations 2
Elected members 1
Local authorities 1
Total 28 
Page 291 of 354

Page 292

Tay Local Flood Risk Management Plan 
Annex 2 | 125 
Three consultation responses were received from the statutory consultees:
• Perth & Kinross Council
• Elected members
• NatureScot
A summary of the specific responses received along with a summary of the changes
made to this Plan is provided below in Table A2.1. 
In general, the respondents made comment on the catchment characterisation,
objectives and selected actions as follows:-
• Some concerns were raised about on-going flooding of increasing frequency in
various areas – mainly in Perth – but these areas are within the designated PVAs
and OTA’s and objectives and actions have been set that will address them.
Some respondents noted concern that their area was outside of a PVA, but this
was due to lower flood risk and the general actions (as set out in Section 2.3 of
this Plan) will apply. Overall, this suggests that the majority of significant flooding
has been recorded in the characterisation reports.
• In general, there was agreement with the proposed objectives and actions
although some responses sought clarification on the timelines, or requested
accelerated timelines. Where possible, the timescales will be provided in the final
published Local Flood Risk Management Plan.
• Concerns were frequently raised around increased flood risk due to development,
but the LPD-wide land use planning action has been set to address this. Annex 3
of this local flood risk management plan also includes land use planning
objectives.
Any concerns raised are considered to have been addressed by the development of
SEPA’s Flood Risk Management Plan, the Council’s actions (flood studies, flood
schemes and on-going flood risk management responsibilities) or the final selected
actions. Therefore, no changes were required to the draft Tay Local Flood Risk
Management Plan. 
Table A2.1: Summary of Specific Issues Raised During Public Consultation 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1   Member of
the public 
Noted flooding in some
areas of Perth City and
Bridge of Earn; that package
of proposed objectives was
too vague; wanted to hear
more about maintenance,
river dredging, use of
The Tay Local FRM Plan
includes various actions for
both Perth and Bridge of Earn,
including flood studies and a
surface water management
plan. More detail on the
objectives and actions –
Page 292 of 354

Page 293

Tay Local Flood Risk Management Plan 
Annex 2 | 126 
beavers, flooding of set
aside agricultural land, etc;
work should begin
immediately. 
including timescales - has
been provided in the final
published Plan. The Plan will
also include maintenance
actions.
2   Member of
the public 
A member of the public in
Perth is concerned that their
property has flooded
multiple times because of
heavy rain and blocked
drains. They are concerned
that this will happen again.  
The Tay Local FRM Plan
includes various actions to
manage the risk of flooding
including various flood studies,
a surface water management
plan and maintenance works.
Perth & Kinross Council’s
Roads Maintenance
Partnership carry out
maintenance of road drainage
systems. Road defects
(including blocked gullies) can
be reported to the Council via
their website.
3   Member of
the public 
A resident of Wallace
Crescent and Fairfield,
Perth expressed concern
that this area is not
mentioned, despite previous
repeated flooding of their
property. They are looking
for reassurance that this will
be considered. They
expressed concern about
development in the area, the
lack of upgrades or
improvements to the
existing drainage system
and the time required for
improvements. 
This area is located within the
Perth PVA (02/08/12) and OTA
253. The proposed Tay Local
FRM Plan includes specific
actions for the area that are
intended to bring about a
reduction in flood risk. These
actions include the on-going
Perth SWMP. Perth & Kinross
Council also invested in road
drainage improvements on
Wallace Crescent in 2021 to
reduce the risk of flooding.
4   Member of
the public 
A resident in Aberfeldy is
concerned about the visual
impact and access issues
associated with the proposal
to build a flood wall as part
of the Aberfeldy Flood
Scheme. 
The respondent noted
involvement in the local
community resilience plan
and in reporting blocked
street drains to the local
authority. 
The Tay Local FRM Plan
includes an action for a new
flood protection scheme in
Aberfeldy. Any issues
associated with visual impact
and access will be addressed
during the outline design of the
flood scheme via further public
consultation and the
Environmental Impact
Assessment.
In the meantime, the Council
welcomes local efforts to
improve flood resilience in
Aberfeldy.
Page 293 of 354

Page 294

Tay Local Flood Risk Management Plan 
Annex 2 | 127 
5   Member of
the public 
A local resident who lives
next to the Craigie Burn in
Perth flooded last year and
expressed concern that
flooding has become more
frequent. They requested
quick action be taken by
pumping water away, noting
issues with surface water,
sewer flooding, issues with
flood gates, property
insurance costs, SUDS and
storage ponds. They have
taken steps to protect their
home and liaise with local
councillors. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253),
including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Plan also includes self-
help and awareness raising
actions.
It is individual property owners’
responsibility to protect
themselves and their assets
from flooding.
6   Member of
the public 
A resident in Craigie, Perth
noted concern that
development has increased
flood risk and that the
objective should include
infrastructure upgrades.
They noted that some
maintenance work has
helped matters but more
requires to be done. The
resident noted that they
have previously raised
issues, but they have not
been acted on, and
suggested a community
meeting. They also note that
they monitor flooding in the
Craigie area and have
reported this to the Council.
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253),
including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study, and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these
issues.
The proposed Plan also
includes other actions
including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences.
The Council welcomes local
efforts to improve flood
resilience in Perth.
7  Member of
the public 
A local resident in
Blairgowrie & Rattray noted
that localised flooding in
The Tay Local FRM Plan
includes maintenance of
watercourses. Perth & Kinross
Page 294 of 354

Page 295

Tay Local Flood Risk Management Plan 
Annex 2 | 128 
rural Perthshire could be
mitigated in a cost-effective
way by improved ditch and
verge maintenance. The
resident noted the proposed
actions and timescales are
‘non-committal’ and won’t be
adhered to. They have
carried out their own verge
maintenance works.
Council’s Flooding team
inspect and assess bodies of
water and carry out clearance
and repair works, where this
will substantially reduce flood
risk. The primary responsibility
for avoiding or managing flood
risk remains with landowners.
Actions and timescales will be
set out in the published Plan
and interim and final reports
will also be published setting
out the progress made.
The Council welcomes local
efforts to improve flood
resilience in Blairgowrie &
Rattray.
8   Member of
the public 
A local resident in Alyth
noted two floods in 6 years
and expressed concern
about waiting until 2028 for
a plan to be made. They
noted the action taken by
the local community to
protect properties but noted
that the Council should do
more. They also noted the
need for more radical action
to prevent flooding by
creating an artificial flood
plain to the north of the
town.   
The Tay Local FRM Plan
includes a number of on-going
actions to manage flood risk in
Alyth.
In particular, Perth & Kinross
Council are currently
undertaking a Natural Flood
Management (NFM) Study in
Alyth. The study will explore
the potential options for flood
risk management measures in
this area, including NFM and
flood storage. 
9   Member of
the public 
A local resident in
Blairgowrie and Rattray
noted that the timescales for
actions are not quick
enough. 
The Tay Local FRM Plan will
set out the current timescales
for actions in Blairgowrie and
Rattray.  This area is currently
the focus of an on-going
surface water management
plan which will consider the
potential means of managing
and, where achievable,
reducing flood risk in this area. 
10  Member of
the public 
A member of the public in
Pitlochry agreed that the
main communities and
infrastructure had been
identified and with the 
No response required.
Page 295 of 354

Page 296

Tay Local Flood Risk Management Plan 
Annex 2 | 129 
proposed objectives for this
area. 
11  Member of
the public 
A member of the public
noted that Dunning was not
listed in the consultation. 
Dunning was included within
PVA 08/16 in the Cycle 1 FRM
Plans, however, following the
2nd national flood risk
assessment in 2018, this area
has been re-assessed as
having a lower level of flood
risk. Dunning is therefore no
longer designated as a PVA.
However, the area is covered
by the proposed LPD-wide
actions set out in the Tay Local
FRM Plan. 
12  Member of
the public 
A member of the public in
Coupar Angus noted that: 
• flood risk is preventing
development and that
development elsewhere
has increased flood risk;
• watercourses are flowing
slower due to overgrown
vegetation and silt. 
• the A93 road should be
raised to prevent road
closures and delayed
emergency access due to
flooding.
• flood defences would
prevent flooding in Coupar
Angus but this would
move the problem
elsewhere. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area, including
the land use planning action.
All new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood risk
remains with landowners. 
The Council’s previous flood
study considered the potential
options for reducing flood risk
in Coupar Angus but
unfortunately did not identify
an economically viable flood
scheme. Flood risk will
therefore continue to be
managed as set out in the Tay
Local FRM Plan. 
13  Member of
the public 
A member of the public in
Perth noted:
• 8 flood events on the
Craigie Burn since 1981; 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253)
Page 296 of 354

Page 297

Tay Local Flood Risk Management Plan 
Annex 2 | 130 
• concern about increased
flood risk due to
development and global
warming;
• the lack of scope for
improving existing flood
defences, e.g.
bottlenecks and culverts
in the Craigie Burn, and
the limited benefit of
maintenance works;
• that the pace of FRM is
too slow to keep pace
with the increased
frequency of flooding;
• that local residents need
to be kept informed of
any local works;
• the on-going risk to
property and people and
the associated costs; and
• it is the public authorities
job to manage flood risk.   
and in particular the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these issues
and the associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce flood
risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners. 
14  Member of
the public 
A member of the public in
Perth noted the increasing
frequency of flooding; the
increase in flood risk due to
development; the need to
improve drainage and not
rely on existing drainage or
watercourses such as the
Craigie Burn; the need for
improved communication on
actions being taken; that the
scale of the flooding over
the last 20 years has been
understated; that the
timescales for action are too
slow and that interim
changes are also required. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253)
and, in particular, the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these issues
and the associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary
Page 297 of 354

Page 298

Tay Local Flood Risk Management Plan 
Annex 2 | 131 
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences. 
15  Member of
the public 
A local resident in Perth
noted:
• that flooding wasn’t
happening ‘once every
200 years’ – there had
been 8 flood events on
the Craigie Burn since
1981; 
• concern about increased
flood risk due to
development; 
• concern about how
SUDS operate and if
they deal with older
development;
• concern about flooding
on the Craigie Burn due
to small culverts and
blockages and the
impact on flooding of
adjacent properties;
• concern that dredging of
the Craigie Burn
increases flood risk
downstream;
• disappointment that
Perth & Kinross Council
appear to be blaming
householders for the
flooding, while allowing
development further
upstream;
• the damage done due to
surface water flooding;
and; 
• that action to manage
flood risk is too slow –
flooding is more frequent;
and
• that more communication
is required from the
Council.
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253)
and in particular the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these issues
and the associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce flood
risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners.  
Page 298 of 354

Page 299

Tay Local Flood Risk Management Plan 
Annex 2 | 132 
16  Member of
the public 
A local resident on the
Cavendish Avenue area of
Perth noted concern about
increasing flooding and
health impacts due to the
limited capacity of the sewer
system outside their
property and development
elsewhere in the catchment.
This has been an issue for
15-16 years, and they feel
that the sewer requires to be
upgraded. The resident
doesn’t feel able to act as
this may increase flood risk
to adjacent properties. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253).
In particular, there is an on-
going IFOS (Internal Flooding
due to Overloaded Sewers)
study being carried out jointly
between Scottish Water and
Perth and Kinross Council to
consider the potential means
of managing and, where
achievable, reducing flood risk
to properties in the vicinity of
Cavendish Avenue.
Community drop-in sessions
will be held early in 2023 to
disseminate the findings of this
study. 
17  Member of
the public 
A member of the public in
the Tomcroy Terrace area of
Pitlochry noted concern that
the flood map omits to show
the flood risk to their
neighbours property, which
has been affected twice by
an adjacent small burn and
surface water run off from
fields. They noted they may
be able to help the local
community resilience group.  
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Tomcroy Terrace is affected by
flooding from the Wester
Kinnaird Burn which was fully
considered by the more
detailed modelling work carried
out under the Pitlochry Flood
Study. The study
recommended a new
watercourse diversion channel
on the Wester Kinnaird Burn at
Tomcroy Terrace, as part of
the wider proposals for a flood
scheme in this area. The
proposed scheme is included
as one of the actions for this
area (the Pitlochry PVA
02/08/02 and OTA 254) in the
Tay Local FRM Plan.
The Council welcomes local
efforts to improve flood
resilience in Pitlochry.
18  Member of
the public 
A member of the public
noted concern about an
increase in flood risk due to
development.
The Tay Local FRM Plan
includes actions to manage
flood risk, including the land
use planning action. All new
development is required to
comply with national and local
Page 299 of 354

Page 300

Tay Local Flood Risk Management Plan 
Annex 2 | 133 
planning policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
19  Member of
the public 
A member of the public in
Comrie agreed that the main
communities and
infrastructure had been
identified and agreed with
the proposed objectives for
this area.
No response required. 
20  Member of
the public 
A member of the public in
Bridge of Earn is concerned
that the Oudenarde and
Brickhall industrial sites are
not included within the
objective target area. They
noted concern about the
proposed objectives don’t
include tributaries to the
River Earn, and need to
address the flat topography
which limits surface water
drainage. They also noted
concern that the timescales
for actions were too long.   
The Tay Local FRM Plan
includes actions to manage
flood risk in Bridge of Earn
(PVA 02/08/14 and OTA 205). 
The development site at
Oudenarde and the Brickhall
Industrial site both fall outwith
OTA 205, although they are
within PVA 02/08/14. The flood
risk on these sites is being
managed through the land use
planning action which applies
across the whole of the local
plan district.
The proposed objectives do
not mention any watercourses
but instead refer to the
management of flood risk.
Flood risk from any bodies of
water and their tributaries will
therefore be considered. The
Deich and Yellow Burns have
been noted against the
‘Maintain flood protection
scheme’ action.
The Plan also includes a Flood
study to better understand the
integrated flooding
mechanisms in Bridge of Earn
(including surface water) and
the potential works required to
reduce flood risk in the future. 
The timescales for all of these
actions have been set out in
the published Plan.
21  Member of
the public 
A member of the public
noted that all vulnerable
areas should be identified,
and this should not be
The potentially vulnerable
areas (PVA’s) were set out in
the second national flood risk
assessment, published in
Page 300 of 354

Page 301

Tay Local Flood Risk Management Plan 
Annex 2 | 134 
limited to affected houses,
but should also include
infrastructure. They note
that Forgandenny isn’t
included, despite previous
flooding, and that the flood
risk maps do not show
previous flooding. They
noted that support is
required from both Perth
and Kinross Council and
SEPA and noted concern
that current legislation does
not force rural landowners to
cooperate on natural flood
measures within their land.    
December 2018. This
assessment considered
homes, businesses and
infrastructure.
Forgandenny is not within one
of the areas designated as a
PVA in 2018. Even though
there has been previous
flooding, the level of flood risk
is not significant enough for
this area to be included within
a PVA.
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Notwithstanding the above,
actions have been set out in
the Tay Local FRM Plan to
manage flood risk across the
local plan district and these
apply to Forgandenny.
While current legislation does
not force rural landowners to
undertake flood measures on
their land, landowners remain
responsible for managing or
avoiding flood risk.
22  Member of
the public 
A member of the public in
Coupar Angus agreed that
the main communities and
infrastructure had been
identified and agreed with
the proposed package of
objectives.
No response required. 
23  Local
business 
A local business owner in
Aberfeldy noted that the
underlying causes of
flooding (the
mismanagement of the
moorlands in Highland
Perthshire) have not been
fully addressed. Work and
legislation should be
introduced immediately.
They noted that banning
grouse shooting, stopping
muir burning and moorland
ditchwork, and tree planting
would help.  
The Tay Local FRM Plan
includes actions to manage
flood risk in Aberfeldy (PVA
02/08/03 and OTA 183). This
area was fully considered by
the Aberfeldy Flood Study
which was completed in 2019.
The study considered a long
list of options (including land
management techniques) and
recommended a flood scheme
involving new flood defences in
the town. The study findings
were disseminated to the local
community via drop-in
Page 301 of 354

Page 302

Tay Local Flood Risk Management Plan 
Annex 2 | 135 
sessions on 20 and 25 June
2019.  
24  Community
body 
Earn Community Council
agreed that the main
communities and
infrastructure had been
identified and agreed with
the proposed objectives,
actions and timescales for
the Bridge of Earn area. The
community council noted
that the local community can
help to limit surface water
runoff due to monoblocking/
surfacing of private land and
by implementing natural
flood management.   
Perth and Kinross Council
welcomes local efforts to
improve flood resilience in
Bridge of Earn. 
25  Other
organisation 
A group of 72 healthcare
professionals in Tayside and
North Fife issued an open
letter to Tayside and Fife
Councillors, in support of
climate mitigation for public
health. The group are
concerned that the
worsening climate crisis is a
public health emergency,
due to several factors
including worsening extreme
weather, such as heavy rain
and flooding. Creating green
and blue spaces can
provide health benefits;
adaptation is required to
cope with increased rainfall,
and the risk of flooding as
climate change worsens. 
The publication of the second
Tay Local FRM Plan is one of
the key actions to help us
adapt to climate change. As a
society, we need to take action
to manage the risk of flooding
and its impacts on our lives,
recognising that the risk can’t
ever be removed entirely. This
plan takes our knowledge and
understanding of flooding and
the impacts of climate change
and turns it into a set of actions
that are planned, prioritised
and co-ordinated to tackle
flooding in the communities
where it affects us the most. 
Flooding needs to be managed
sustainably so that flood risk is
reduced without moving the
problem elsewhere. It must be
done in a way that contributes
to the health and wellbeing of
communities, supports the
protection and regeneration of
the environment, improves
resilience to climate change
and enables a sustainable
economy. Actions are needed
on all sources of flooding –
including from rivers, the sea,
surface water and groundwater
– to meet the needs of present
Page 302 of 354

Page 303

Tay Local Flood Risk Management Plan 
Annex 2 | 136 
and future generations while
also protecting and enhancing
the environment.
26  Other
organisation 
NatureScot noted that they
had previously contributed
to the 2018 NFRA
consultation and were in
general agreement with this
consultation. They provided
various detailed comments
on the proposed actions in
various OTA’s and the need
for an HRA to cover some of
these, due to on-going and
proposed actions within
Special Areas of
Conservation (SAC).
NatureScot also reiterated
that Natural Flood
Management (NFM) should
be used where possible to
reduce flood risk.  
NatureScot’s comments will
inform the various future
actions to be taken on flood
risk.
The Council has undertaken a
HRA as part of development of
the Tay Local FRM Plan and
has consulted with NatureScot
on this.  
NFM is considered in the
development of the Tay Local
FRM Plan and in the long list
of actions considered as part
of any individual flood studies. 
27  Elected
members 
Two of the Ward 10 elected
members (Councillors
Barrett & Wilson) in Perth &
Kinross Council noted
concern about various
flooding issues in Perth
including:
• Surface water flooding
from the M90 motorway
and the Broxden Park &
Ride facility;
• Operation of the flood
storage ponds at
Broxden;
• Maintenance of the
Scouring and Craigie
Burns;
• Arrangements for
developers completing
works and handing them
to the Council for
adoption;
• Flood gate closures on
the Perth Flood Scheme;
• River and surface water
flooding at various
locations.
The Tay Local FRM Plan on-
going includes actions to
manage flood risk in this area
(the Perth PVA 02/08/12 and
OTA 253); in particular, the
maintenance of the existing
Perth Flood Scheme, the
Craigie Burn Flood Study, the
Perth SWMP and the Perth
IFOS Project. 
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk. 
The Council also works with
developers to ensure that any
issues are fully addressed prior
to adoption. 
The primary responsibility for
avoiding or managing flood risk
remains with landowners.
A separate detailed response
was sent to the elected
members by e-mail on 25
January 2022.
Page 303 of 354

Page 304

Tay Local Flood Risk Management Plan 
Annex 2 | 137 
28  Local
Authorities 
Perth & Kinross Council’s
flooding team made
comments specific to
various OTA’s; provided
updates for the prioritisation
of proposed Cycle 2 flood
schemes and flood
protection works; noted
concern over the lack of any
Scottish Water actions; and
suggested that Scottish
Foresty/Forestry & Land
Scotland should be
including objectives and
actions within the published
FRM Plans. No comment
was made by other services
within the Council.
N/A 
Perth and Kinross Council informed SEPA of any views expressed during the
consultation that were considered to be relevant to SEPA’s Flood Risk Management
Plan. SEPA subsequently published their consultation digest in March 2022 (which
can be viewed here) explaining how they took account of these views in preparing
the Flood Risk Management Plans.
The views and representations of the respondents were also taken into account in
developing and finalising this Local Flood Risk Management Plan.
The local authorities in the Tay District presented the findings from the public
consultation to their elected members as follows: 
Perth & Kinross Council
Perth and Kinross Council presented the findings of the consultation in a report to
their Climate Change and Sustainability Committee on 19 December 2022. The
committee report can be viewed here:
[link to be inserted]
Angus Council
Angus Council presented the findings of the consultation in a report to their
Environment Committee on [date to be advised]. The committee report can be
viewed here:
[link to be inserted]
Stirling Council
Page 304 of 354

Page 305

Tay Local Flood Risk Management Plan 
Annex 2 | 138 
Stirling Council presented the outcome of the consultation initially to their committee.
The committee report can be viewed here:
[link to be inserted]
Fife Council
Fife Council presented the findings of the consultation to their elected members on
23 June 2015 as detailed here:
[link to be inserted] 
As noted at the start of this Annex, the public consultation closed on 31 October
2021 and there has not been any further formal communications or engagement in
relation to this Plan. 
Page 305 of 354

Page 306

Tay Local Flood Risk Management Plan 
Annex 3 | 139 
Annex 3: Land Use Planning 
Approach to Land Use Planning in the Tay Local Plan District 
Perth and Kinross Council is a local planning authority and will coordinate its work
with the strategic development planning authority and the National Parks Authorities,
who are also planning authorities. 
The Council’s Flooding Team are consulted on planning applications and work with
the Planning and Development Service to provide advice and ensure that flood risk
is addressed. The Perth & Kinross Local Development Plan (LDP2) provides the
framework against which planning applications outside the National Parks are
assessed and is consistent with the Strategic Development Plan (TAYplan). 
Supplementary Guidance on Flood Risk and Flood Risk Assessments is also
available to support the content of the Perth & Kinross Local Development Plan.
Planning applications within the National Parks are assessed against their respective
Local Development Plans, which also contain policies in relation to flood risk.
Planning applications are also reviewed against SEPA’s indicative flood maps,
existing flood studies and records of flooding. Where flood risk is an issue,
developers are required to prepare and submit a site-specific flood risk assessment
and drainage impact assessment as applicable. They must also consider how a
development site will be drained and how surface water runoff will be managed
through the implementation of appropriate Sustainable Urban Drainage Systems
(SuDS). 
The above referenced documents can be viewed at the links provided in Annex 5. 
The Scottish Planning Policy sets out a flood risk framework to guide development.
Areas of medium to high risk – where the annual probability of coastal or
watercourse flooding is greater than 0.5% (1:200 years) – may be suitable for
development provided flood protection measures to the appropriate standard (1:200
years) already exist and are maintained, are under construction, or are a planned
measure in a current flood risk management plan. This is a matter for careful
consideration through review of the Development Plan and its Strategic
Environmental Assessment. However, if the site is an important component of the
settlement strategy and no other equally suitable site is available then development
(apart from civic infrastructure and the most vulnerable uses) may be suitable. Any
development is such areas would also be subject to appropriate mitigation
measures: including water resistance, and water resilience measures and
evacuation procedures. 
So as to align the flood risk management and land use planning systems, land use
planning objectives and actions have been developed as shown below. 
Page 306 of 354

Page 307

Tay Local Flood Risk Management Plan 
Annex 3 | 140 
Flood Risk Management Actions From National Planning Policies 
The following objectives and actions reflect national Land Use Planning policies and
Guidance:- 
AVOID DEVELOPMENT IN MEDIUM TO HIGH RISK AREAS 
a) Planning authorities work in partnership undertaking catchment-wide Strategic
Flood Risk Assessments to inform their development plan allocations in line with
SEPA’s guidance and Land Use Vulnerability.
b) Planning authorities and SEPA require the submission of flood risk
assessments that accord with SEPA’s Technical Flood Risk Guidance for
Stakeholders, to support planning applications where there is a potential flood
risk. The flood risk assessment should be used to demonstrate as far as possible
that the development will be safe for its lifetime, without increasing flood risk
elsewhere and, where possible, takes opportunities to reduce flood risk overall.
c) SEPA ensures that its flood risk advice to planning authorities is clear and
appropriate. SEPA, in consultation with planning authorities, undertakes an
annual assessment of planning advice and its contribution to flood risk.
d) SEPA and planning authorities engage at an early stage of the development
plan process to agree appropriate forms of development to help inform the
preparation and implementation of Strategic Flood Risk Assessments. 
REDUCE IMPACTS TO EXISTING BUILDINGS 
a) SEPA, planning authorities and local communities are required to engage at
an early stage of the development plan process to agree the best long term land
uses for areas where relocation, abandonment and/or change of use have been
identified to deliver sustainable flood risk management. Where possible, new
land uses should aim to achieve multiple benefits for local communities such as
the creation of blue / green infrastructure and increased resilience to climate
change. 
PROTECT AND ENHANCE NATURAL FEATURES THAT HAVE A POSITIVE
IMPACT ON REDUCING OVERALL FLOOD RISK 
a) SEPA and planning authorities are required to engage early in the
development plan process to identify opportunities for the restoration and
protection of natural features which help manage flood risk. Opportunities should
be maximised to achieve multiple benefits such as the development of green /
blue infrastructure and improved place making. Areas of land that may contribute
to flood management should be identified and protected. 
Page 307 of 354

Page 308

Tay Local Flood Risk Management Plan 
Annex 3 | 141 
NEW DEVELOPMENTS ARE DESIGNED TO ENSURE THAT SURFACE WATER
DRAINAGE DOES NOT INCREASE FLOOD RISK ON OR OFF SITE 
a) SEPA prepares guidance for planning authorities and developers on the use of
surface water hazard maps for land use planning purposes.
b) Planning authorities support the implementation of Surface Water
Management Plans, developed by the local authorities, through development
plan allocations and policies. Surface Water Management Plans should take
account of development opportunities that could contribute to the reduction of
surface water flood risk.
c) SEPA engages at an early stage of the development plan process to progress
exemplar projects that demonstrate the potential for land use planning to
mitigate surface water flooding and contribute to wider environmental benefits. 
NEW DEVELOPMENT IS RESILIENT TO PREDICTED FUTURE CHANGES IN
CLIMATE 
a) Planning authorities ensure that climate change is considered in Strategic
Flood Risk Assessments and Flood Risk Assessments, based upon the best
scientific evidence and the information requirements of planners to make
informed decisions. 
Page 308 of 354

Page 309

Tay Local Flood Risk Management Plan 
Annex 4 | 142 
Annex 4: Strategic Environmental Assessment & Habitats Regulations Appraisal 
Strategic Environmental Assessment
The Environmental Assessment (Scotland) Act 2005 places a duty on Perth & Kinross
Council to identify and assess the environmental consequences of its proposals.
There are likely to be significant environmental effects associated with the Tay Local
Flood Risk Management Plan. As a consequence, an environmental assessment is
necessary. SEPA have completed an environmental assessment for their Flood Risk
Management Plans and their environmental report has been published. Following a
review of this assessment, it has been confirmed that this will cover the Tay Local
Flood Risk Management Plan and that no further assessment is required. A screening
report was submitted to the SEA Gateway to confirm this. The screening responses
received via the SEA Gateway confirmed that this Plan is consistent with the Tay
Flood Risk Management Plan and therefore no further assessment is required at this
time. Further impact assessments will be undertaken on any specific projects as
required. The screening report can be viewed via the SEA Gateway by searching for
Perth & Kinross Council at the following link;
https://www.strategicenvironmentalassessment.gov.scot/ 
Habitats Regulations Appraisal
The Tay Local Flood Risk Management Plan was considered in light of the
assessment requirements of regulation 48(1) of the Conservation (Natural Habitats,
&c) Regulations 1994 (as amended) by Perth and Kinross Council as the competent
authority responsible for adopting the Plan and any assessment of it required by the
Regulations.
Following screening out of sites where there were no credible impact pathways from
the proposals within the Local Flood Risk Management Plan, a list of European sites
potentially affected by the Plan is given below:
• River Tay SAC
• Shingle Islands SAC
• Black Wood of Rannoch SAC
• Glenartney Juniper Wood SAC
• Upper Strathearn Oakwoods SAC
• Loch of Kinnordy SPA
Having carried out a ‘screening’ assessment of the Plan, the competent authority has
concluded that 20 actions in the Plan have been assessed as having a likely
significant effect on a European site. The following generic mitigation statement has
been applied: ‘Therefore, to be in accord with the Tay Local Flood Risk Management
Plan, the responsible authority should seek to ensure that the action will not have an
Page 309 of 354

Page 310

Tay Local Flood Risk Management Plan 
Annex 4 | 143 
adverse effect on the integrity of any Natura site (SPA or SAC) before any consents or
permissions are granted’. This statement ensures that a more detailed assessment of
each action is carried out as more detail becomes available (i.e., at the project level).
This may require the inclusion of suitable mitigation during the development of these
actions in the first planning cycle.
NatureScot was consulted on this conclusion (on 29th July 2022) and has agreed with
it (following the adoption of any recommended changes). 
Page 310 of 354

Page 311

Tay Local Flood Risk Management Plan 
Annex 5 | 144 
Annex 5: Links to Other Plans, Policies, Strategies and Legislative Requirements 
Other Plans, Policies, Strategies and Legislative Requirements
The following plans, policies strategies and legislative requirements are relevant to this
Plan:
Council/
Responsible
Authority
Details of Plan Hyperlink or web address
Perth &
Kinross
Council
Strategic Development
Plan
https://www.tayplan-
sdpa.gov.uk/publications 
Perth &
Kinross
Council
Strategic Development
Plan (TAYPlan
Website)
http://www.tayplan-
sdpa.gov.uk/strategic_development_plan 
Perth &
Kinross
Council
Local Development Plan
https://www.pkc.gov.uk/media/45242/Ado
pted-Local-Development-Plan-
2019/pdf/LDP_2_2019_Adopted_Interacti
ve.pdf?m=637122639435770000
Perth &
Kinross
Council
Local Development Plan
(website link) http://www.pkc.gov.uk/developmentplan
Perth &
Kinross
Council 
Supplementary
Guidance - Developers
Guidance Note on
Flooding & Drainage
https://www.pkc.gov.uk/ldp2floodrisk 
Angus
Council Local Development Plan
https://archive.angus.gov.uk/localdevelop
mentplan/AngusDevelopmentPlanSchem
e2014.pdf
Stirling
Council Local Development Plan
https://my.stirling.gov.uk/services/plannin
g-and-the-environment/planning-and-
building-standards/local-and-statutory-
development-plans/local-development-
plan 
Fife Council
TAYPlan and SESPlan
are the soon to be
adopted Strategic
Development Plans
https://www.fifedirect.org.uk/topics/index.
cfm?fuseaction=service.display&p2sid=B
A85256B-C559-16FB-
C2D8A09D3FEB7E83&themeid=2B482E
89-1CC4-E06A-52FBA69F838F4D24 
Fife Council
Local Development
Plan due to be
adopted in 2016
https://www.fifedirect.org.uk/topics/index.
cfm?fuseaction=page.display&p2sid=D61
AC1F5-DD4B-CE6A-
51E3BDDED79D5ABC&themeid=2B482
E89-1CC4-E06A-52FBA69F838F4D24 
Fife Council Adopted St Andrews &
East Fife Local Plan
http://fife-
consult.objective.co.uk/portal/fife_ldp/fifep
lan_-_adopted_plan_13/adopted_fifeplan 
Page 311 of 354

Page 312

Tay Local Flood Risk Management Plan 
Annex 5 | 145 
Fife Council Adopted Mid Fife Local
Plan
http://fife-
consult.objective.co.uk/portal/fife_ldp/fifep
lan_-_adopted_plan_13/adopted_fifeplan 
Fife Council Adopted Dunfermline
& West Fife Local Plan
http://fife-
consult.objective.co.uk/portal/fife_ldp/fifep
lan_-_adopted_plan_13/adopted_fifeplan 
Fife Council
South East Scotland
and Tay Strategic
Transport Plans
http://sestran.gov.uk/
https://tactran.gov.uk/ 
Fife Council Shoreline
Management Plan
https://www.fifedirect.org.uk/minisites/ind
ex.cfm?fuseaction=page.display&pageid=
B3679654-A6D1-5C31-
F426BD276B04EF36&siteID=B35A78B8-
9AF8-3BC3-A4DA217231595BC2 
Scottish
Water
General Guidance on
Flooding
http://www.scottishwater.co.uk/you-and-
your-home/your-home/flooding-
information
SEPA
The river basin
management plan for
the Scotland river
basin district: 2015–
2027
http://www.sepa.org.uk/environment/wate
r/river-basin-management-planning/
SEPA
FRM Strategy Tay Local
Plan District, December
2015
http://apps.sepa.org.uk/FRMStrategies/ta
y.html
SEPA
FRM Strategies for
Scotland
Environmental Report,
December 2015
http://www.sepa.org.uk/environment/wate
r/flooding/FRM-strategies/frminfo/
SEPA Land use planning
guidance
http://www.sepa.org.uk/environment/land/
planning/
SEPA Flood Maps http://www.sepa.org.uk/environment/wate
r/flooding/flood-maps/
Forestry
And Land
Scotland
Control of Woodland
https://scotland.forestry.gov.uk/supporting
/strategy-policy-guidance/woodland-
expansion/control-of-woodland-removal 
Loch
Lomond &
Trossachs
NPA
Local Development Plan
(Adopted)
http://www.lochlomond-
trossachs.org/planning/planning-
guidance/local-development-plan/ 
Cairngorms
NPA
National Park
Partnership Plan 2012-
2017
http://cairngorms.co.uk/authority/publicati
on/299/
Cairngorms
NPA
Local Development Plan
2015
http://cairngorms.co.uk/park-
authority/planning/local-dev-plan/ 
Page 312 of 354

Page 313

Tay Local Flood Risk Management Plan 
Annex 5 | 146 
Section 18 Schedule of Clearance and Repair Works
The following links provide access to the schedules of clearance and repair produced
by the local authorities in the Tay Local Plan District. The schedules are a requirement
of Section 18 of the Flood Risk Management (Scotland) Act 2009. 
Local Authority Method of Public Access to the 
Schedule of Clearance and Repair Works
Perth & Kinross
Council
Perth & Kinross Council’s Schedule of Clearance & Repair
Works is available at the following web address:
https://www.pkc.gov.uk/article/14718/Flooding-duties-and-
responsibilities
or via the direct link:
https://www.pkc.gov.uk/media/22028/Schedule-of-
watercourse-clearance-and-
repair/pdf/2022_02_25_Schedule_of_Watercourse_Cleara
nce_and_Repair_-_2021-22.pdf?m=637813829018370000
Angus Council Currently only obtainable in hard copy from:
County Buildings, Market Street, Forfar, Angus, DD8 3WE
Fife Council
Fife Council’s Schedule of Clearance & Repair is available
at the following web address:
http://www.fifedirect.org.uk/topics/index.cfm?fuseaction=pa
ge.display&p2sid=618DD563-ABBC-ECA5-
1675450324EED528&themeid=81E299FB-1BCF-4994-
8C8A-233463B738F6
Stirling Council Currently only available on request at;
Endrick House, Kerse Road, Stirling FK7 7SZ 
Surface Water Management Plans
As noted in Chapter 2 of this Plan, surface water flooding is experienced in areas of the
Tay Local Plan District. This will be addressed by Surface Water Management
Planning. A brief description of the work that is currently being carried, out or is
planned, within the Tay Local Plan District is provided below. 
Perth and Kinross Council
Scottish Water and Perth and Kinross Council completed the Perth Integrated
Catchment Study in December 2019. Perth and Kinross Council worked in partnership
with Scottish Water on this study. The Council is currently leading on the development
of the Perth Surface Water Management Plan in partnership with Scottish Water and
SEPA. This is being informed by the work of the integrated catchment study and will
identify and implement the most sustainable actions to manage surface water flooding
in the area.
Page 313 of 354

Page 314

Tay Local Flood Risk Management Plan 
Annex 5 | 147 
The development of a surface water management plan for Blairgowrie and Rattray
commenced in October 2022. This project will also consider the flood risk on the
Rattray Burn.
Further surface water management plans are also proposed for Scone, Comrie and
Aberfeldy and will commence later in the second flood risk management planning cycle. 
Angus Council
Angus Council will lead on the development of a Surface Water Management Plan for
Forfar. This work will be carried out in partnership with Scottish Water and SEPA and
will identify the most sustainable measures to manage surface water flooding in the
area. 
Fife Council
Fife Council has no surface water management planning actions to deliver within the
Tay Local Plan District. 
Stirling Council
Stirling Council has no surface water management planning actions to deliver within the
Tay Local Plan District. 
Page 314 of 354

Page 315

Tay Local Flood Risk Management Plan 
Annex 6 | 148 
Annex 6: Supporting information
The following information has been extracted from the Tay Flood Risk Management
Plan 
Sources of Flooding Described in the Plan 
The Tay Flood Risk Management Plan addresses the risk of flooding from rivers, the
coast and surface water. The risk of flooding from rivers is usually due to rainfall
causing a river to rise above bank level spreading out and inundating adjacent areas.
Coastal flooding is where the risk is from the sea. Sea levels can change in response
to tidal cycles or atmospheric conditions. Over the longer term, sea levels and
coastal flood risk may change due to climate change. Surface water flooding
happens when rainwater does not drain away through the normal drainage systems
or soak into the ground but lies on or flows over the ground instead. There can be
interactions between these sources of flooding. 
Groundwater is usually a contributing factor to flooding rather than the primary
source. It is caused by water rising up from underlying rocks or flowing from springs.
Actions to directly target groundwater are quite limited in the Plan. However,
susceptibility to the contributing effects of groundwater on flooding was considered
everywhere in the national flood risk assessment which underpins the Plan. Maps of
areas where groundwater can contribute to flood risk are available to view on
SEPA’s website: https://map.sepa.org.uk/floodmap/map.htm 
The following aspects of flooding have not been incorporated into the Plan: 
• Reservoir breaches have been assessed under separate legislation
(Reservoirs (Scotland) Act 2011) and so flood risk from reservoir breach is not
considered in this plan. There are fundamental differences in probability of
flooding and associated management actions for reservoirs. Further information
and maps can be found on SEPA’s website at:
www.sepa.org.uk/regulations/water/reservoirs/
• The Flood Risk Management (Scotland) Act 2009 does not require SEPA or
responsible authorities to assess or manage coastal erosion. However, SEPA
has included consideration of erosion in the Flood Risk Management Plans by
identifying areas that are likely to be susceptible to erosion and where erosion
can exacerbate flood risk. As part of considering where actions might deliver
multiple benefits, SEPA have looked to see where the focus of coastal flood risk
management studies coincides with areas at risk of coastal erosion as identified
by the Dynamic Coast project. Subsequent detailed flood studies and scheme
design will need to consider coastal erosion in these areas. This includes
ensuring that actions to manage flood risk do not contribute to increased coastal
Page 315 of 354

Page 316

Tay Local Flood Risk Management Plan 
Annex 6 | 149 
erosion and where appropriate, help to manage risks from coastal erosion now
and in the future.
• Coastal flood modelling. The information on coastal flooding used to set
objectives and identify actions is based on SEPA modelling using simplified
coastal processes and flooding mechanisms.As a result, coastal flood risk may
be underestimated in some areas and overestimated in others. Where more
detailed local models were available from flood studies or from flood warning
schemes, these have been incorporated into the development of the flood risk
management plans, as have other sources of local information such as records
of past flooding. SEPA is currently working on updates to the national coastal
flood mapping to better represent the effects of waves. Actions in the plans
reflect the best information currently available. 
Commonly Used Terms 
Below are explanatory notes for the commonly used terms in this local flood risk
management plan. A glossary of terms is also available. 
• Reference to flood risk. To develop this Plan, flood risk has been assessed
over a range of likelihoods. For consistency in reporting information, unless
otherwise stated, all references to properties or other receptors being ‘at risk of
flooding’ refer to a medium likelihood flood (up to a 0.5% chance of flooding in
any given year). By exception, references will be made to high or low risk
flooding, which should be taken to mean a 10% chance/likelihood or 0.1% 
chance/likelihood of flooding in any given year respectively. 
Chance / Likelihood of flooding
Likelihood Return Period Annual Chance
High  10 year 10%
Medium  200 year 0.5%
Low  1000 year 0.1% 
• An Annual Cost of Flooding is given as an assessment of the economic impact
of flooding within an area. Depending on its size or severity each flood will cause
a different amount of damage to a given area. Annual average damages are the
theoretical average economic damages caused by flooding when considered
over many years. It does not mean that value of damage will occur every year: in
many years there will be no damages and in some years the damages will be
minor. In most places, there will be a very small number of years when much
bigger floods occur, and that is when the highest damage costs will occur. To
assess the annual cost, this is averaged over many years. In some areas,
smaller floods which happen frequently contribute more to the annual cost than
much larger events which are rarer. Within the plans, the annual cost of flooding
has been calculated based on the methods set out in the Flood Hazard
Research Centre’s Multi-Coloured Handbook (2016).
Page 316 of 354

Page 317

Tay Local Flood Risk Management Plan 
Annex 6 | 150 
• History of flooding. The history of flooding sections of this document report
floods that have occurred up to November 2022. 
Flood risk management planning process 
Flood risk management in Scotland aims to manage flooding in a sustainable way.
Sustainable flood risk management considers where floods are likely to occur in the
future and takes action to reduce their impact without moving the problem
elsewhere. It considers all sources of flooding, whether from rivers, the sea or from
surface water. It delivers actions that will meet the needs of present and future
generations whilst also protecting and enhancing the environment. 
The sustainable approach to managing flood risk works on a six-year planning cycle,
progressing through the key stages outlined below. 
Identifying priority areas at significant flood risk 
The first step to delivering a risk-based, sustainable and plan-led approach to flood
risk management was SEPA’s second National Flood Risk Assessment, which
was published in 2018. The assessment considered the likelihood of flooding from
rivers, groundwater, and the sea, as well as flooding caused when heavy rainfall is
unable to enter drainage systems or the river network. The likelihood of flooding was
examined alongside the estimated impact on people, the economy, cultural heritage
and the environment. It significantly improved our understanding of the causes and
consequences of flooding and identified areas most vulnerable to floods. 
Based on the second National Flood Risk Assessment, SEPA identified areas where
flooding was considered to be nationally significant. These areas are based on
catchment units as it is within the context of the wider catchment that flooding can be
best understood and managed. These nationally significant catchments are referred
to as Potentially Vulnerable Areas. In Scotland, 235 Potentially Vulnerable Areas
were identified. They are estimated to contain around 90% of the total number of
properties at risk. 
Improving the understanding of flooding 
SEPA has developed flood hazard and flood risk maps. These maps improved our
understanding of flooding and helped inform the subsequent selection of actions to
manage flood risk in Potentially Vulnerable Areas. The flood hazard maps show
information such as the extent of flooding, water level, as well as depth and velocity
where appropriate. The flood risk maps provide detail on the impacts on people, the
economy, cultural heritage and the environment. 
In 2012 SEPA also developed an assessment of the potential for natural flood
management. The assessment produced the first national source of information on
where natural flood management actions would be most effective within Scotland. 
Flood hazard and flood risk maps and the assessment of the potential for natural
flood management can be viewed on SEPA’s website at www.sepa.org.uk.  
Page 317 of 354

Page 318

Tay Local Flood Risk Management Plan 
Annex 6 | 151 
Identifying objectives and selecting actions 
The objectives and actions to manage flooding will provide the long-term vision and
practical steps for delivering flood risk management in Scotland. 
Working collaboratively with local partnerships, SEPA has agreed the objectives for
addressing the main flooding impacts. Actions that could deliver these agreed
objectives have been selected to ensure the right combinations are identified. The
actions considered in the development of this Plan include structural actions (such
as building floodwalls, restoring flood plains, or clearance and repair works to rivers)
and non-structural actions (such as flood warning, land use planning or improving
our emergency response). Structural and non-structural actions should be used
together to manage flood risk effectively. 
An assessment of the potential for natural flood management was used to help
identify opportunities for using the land and coast to slow down and store water. 
Natural flood management actions will be considered further in areas where flood
studies are planned. 
Page 318 of 354

Page 319

Tay Local Flood Risk Management Plan 
Annex 7 | 152 
Annex 7: Glossary 
TERMINOLOGY  DEFINITION
Accretion Accumulation of sediment.
Actions
Activities undertaken to reduce the impact of
flooding. Referred to as ‘measures’ within the FRM
Act, Actions in the plans describe where and how
flood risk will be managed. These actions have been
set by SEPA and agreed with flood risk management
authorities and were subject to public consultation.
Section 1.2.6 of the flood risk management plans
describes how actions have been selected.
Adaptation Plan
An adaptation plan is intended to inform medium to
long term management of an area. This plan should
investigate multiple potential climate change
scenarios and identify the best route to flood
management under each scenario.
Annual Average Damages
(AAD)
Depending on its size or severity each flood will
cause a different amount of damage to a given area.
Annual average damages (AADs) are the theoretical
average economic damages caused by flooding
when considered over a very long period of time. It
does not mean that level of damage will occur every
year: in many years there will be no damages, in
some years minor damages and in a few years major
damages may occur. High likelihood events, which
occur more regularly, contribute proportionally more
to AADs than rarer events. Within the flood risk
management plans AADs incorporate economic
damages to the following receptors: residential
properties, nonresidential properties, vehicles,
emergency services, agriculture and roads. They
have been calculated based on the principles set out
in the Flood Hazard Research Centre Multi-Coloured
Manual (2016). 
Annual cost of flooding
An annual cost of flooding is an assessment of the
economic impact of flooding within an area.
Depending on its size or severity each flood will
cause a different amount of damage to a given area.
See ‘annual average damages’.
Appraisal
The process of defining objectives, examining flood
management options and weighing up costs,
benefits, risks and uncertainties before a decision is
made. The appraisal method used in the flood risk
management plans is designed to set objectives and
identify the most sustainable combination of actions
Page 319 of 354

Page 320

Tay Local Flood Risk Management Plan 
Annex 7 | 153 
to tackle flooding from rivers, the sea and surface
water.
Appraisal baseline Defines the existing level of flood risk under the
current flood risk management regime.
Area of benefit (AOB)
An area which has benefited from a flood defence or
flood protection scheme and is now at a reduced risk
of flooding relative to the scheme’s standard of
protection.
Assets
Flood risk assets are structures and features which
are likely to have a significant effect on flood risk.
These can include pumping stations, culverts, walls
and river banks.
Awareness Raising
Public awareness, participation and community
support are essential components of sustainable
flood risk management. Improved awareness of flood
risk and actions that prepare individuals, homes and
businesses for flooding can reduce the overall
impact. SEPA and other responsible authorities have
a duty to raise public awareness of flood risk. This is
undertaken both individually and collaboratively by a
range of organisations. 
Bathing waters
Bathing waters are classed as protected areas under
Annex IV of the Water Framework Directive (WFD).
There are 84 designated bathing waters in Scotland.
Benefit cost ratio (BCR)
A benefit cost ratio summarises the overall value for
money of an action or project. It is expressed as the
ratio of benefits to costs (both expressed as present
value monetary values). A ratio greater than 1:1
indicates that the economic benefits associated with
an action are greater than the economic costs of
implementation; therefore, this is taken as the
threshold of economic viability. It should be
recognised that it is not always possible to accurately
estimate economic values for all elements of benefit,
and benefit cost ratio is just one of a number of
techniques used in appraisal. 
Blue green infrastructure 
Blue green infrastructure refers to use of green
pathways to store or transfer excess water and
includes sustainable drainage systems, swales
(shallow, broad and vegetated channels designed to
store and/or convey runoff and remove pollutants),
wetlands, rivers, canals (and their banks) and all
watercourses. See also green infrastructure.
Bund  See flood bund 
Candidate Potentially
Vulnerable Area (PVAc) 
Candidate PVAs are those areas identified after the
National Flood Risk Assessment (2011) as a result of
new information where the impact of flooding is
potentially sufficient to justify further assessment and
appraisal. They will be considered for inclusion as
Page 320 of 354

Page 321

Tay Local Flood Risk Management Plan 
Annex 7 | 154 
new PVAs in the next flood risk management
planning cycle. 
Catchment  All the land drained by a river and its tributaries. 
Category 1 and 2
Responders 
(Cat 1 / 2) 
Category 1 and 2 responders are defined as part of
the Civil Contingencies Act 2004 which seeks to
minimise disruption in the event of an emergency. 
• Category 1 responders are ‘core’ responders:
local authorities, police, fire and rescue services,
ambulance service, NHS health boards, SEPA
and the Maritime and Coastguard Agency.
• Category 2 responders are key co-operating
responders in support of Category 1 responders.
These include gas and electricity companies, rail
and air transport operators, harbour authorities,
telecommunications providers, Scottish Water,
the Health and Safety Executive and NHS
National Services Scotland.
Channel (capacity)
improvement 
Where work has been carried out on a river channel
allowing an increase in the volume of water it can
carry. 
Characterisation 
A description of the natural characteristics of
catchment, coastlines and urban areas in terms of
hydrology, geomorphology, topography and land
use. It also includes the characterisation of existing
levels of flood risk and activities to manage flood risk. 
Coastal flooding 
Coastal flooding is where the risk is from the sea.
Flooding can result from high sea levels or a
combination of high sea levels and stormy
conditions. The term coastal flooding is used under
the Flood Risk Management (Scotland) Act 2009, but
in some areas it is also referred to as tidal flooding
and covers areas such as estuaries and river
channels that are influenced by tidal flows. 
Combines sewer
Combined sewers transport sewage from homes and
industry and also carry surface water runoff from
gutters, drains and some highways. Heavy or
prolonged rainfall can rapidly increase the flow in a
combined sewer until the amount of water exceeds
sewer capacity.
Combined sewer (overflow)
(CSO) 
Combined sewer overflows are structures designed
to ensure any excess water from sewerage systems
is discharged in a controlled way and at a specific
managed location. 
Community facility 
Within the plans the term ‘community facilities’
includes:
• Emergency services (police, fire, ambulance,
coastguard, and mountain rescue)
Page 321 of 354

Page 322

Tay Local Flood Risk Management Plan 
Annex 7 | 155 
• Educational buildings (crèche, nursery, primary,
secondary, further, higher and special education
premises)
• Healthcare facilities: hospitals, health centres and
residential care homes
Competent Authority  SEPA’s designation
Community flood action
groups
Community flood action groups are community-
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ in
composition and remit. There are over 60 groups
already established in Scotland. The Scottish Flood
Forum provides support for both new and existing
groups.
Confluence  Where two or more rivers meet. 
Conveyance
Conveyance is a measure of the carrying capacity of
a watercourse. Increasing conveyance enables flow
to pass more rapidly and reducing conveyance slows
flow down. Both actions can be effective in managing
flood risk depending on local conditions.
Cross Border Advisory
Group (CBAG)
The Cross Border Advisory Group is a statutory
group made up of representatives from the
Environment Agency, SEPA, Scottish Water and the
4 local authorities located within the Solway-Tweed
River Basin District. This group ensure coordination
of plans across the border between England and
Scotland.
Cultural heritage site 
Historic Environment Scotland maintains lists of
buildings of special architectural or historic interest.
These buildings are referred to as ‘listed buildings’.
The highest level of designation is a World Heritage
Site. Other designations included in this assessment
are scheduled monuments, gardens and designed
landscapes, and battlefields.
Culvert 
A pipe, channel or tunnel used for the conveyance of
a watercourse or surface drainage water under a
road, railway, canal or other obstacle. 
Damages  See ‘Annual Average Damages’, ‘direct damages’,
‘indirect damages’. 
Demountable defences 
A temporary flood barrier is one that is only installed
when the need arises, that is, when high flood levels
are forecast. A demountable flood defence is a
particular form of temporary defence that requires
built-in parts and therefore can only be deployed in
one specific location.v
Deposition  A natural process leading to an accumulation of
sediment on a river bed, floodplain or coastline. 
Page 322 of 354

Page 323

Tay Local Flood Risk Management Plan 
Annex 7 | 156 
Direct damages 
Defined in the appraisal process as immediate
damages to the receptor as a result of flooding (e.g.
damages to the fabric or content of buildings, clean-
up costs).
Economic impact 
An assessment of the economic value of the positive
and negative effects of flooding and the actions
taken to manage floods. 
Embankment 
Flood embankments are earthfill structures designed
to contain high river levels. They are commonly
grass-covered, but may need additional protection
against erosion by swiftly flowing water, waves or
overtopping.
Emergency plans /
response
Emergency response plans are applicable for all
types of flooding. They set out the steps to be taken
during flooding in order to maximise safety and
minimise impacts where possible. Under the Civil
Contingencies Act, Category 1 Responders have a
duty to maintain emergency plans. Emergency plans
may also be prepared by individuals, businesses,
organisations or communities.  
Environmental impact  A change in the environment that could have a
negative or positive effect on the ecosystem. 
Environmental Impact
Assessment (EIA) 
Environmental Impact Assessment (EIA) is a process
which identifies the potential environmental effects,
both negative and positive, of a proposal. 
Environmental sites /
environmental designated
areas/ environmentally
designated sites 
Areas formally designated for environmental
importance, such as Sites of Special Scientific
Interest (SSSI), Special Protection Area (SPA) or
Special Areas of Conservation (SAC). 
Episodic erosion  Erosion induced by a single event such as a storm. 
Erosion  A natural process leading to the removal of sediment
from a river bed, bank or floodplain or coastline. 
Estuarine surge attenuation  How an estuary influences the dissipation of coastal
surges caused by tides or weather. 
Estuary 
A coastal body of water usually found where a river
meets the sea; the part of the river that is affected by
tides. 
Fault (fault line) 
A break or fracture in the ground that occurs when
the Earth's tectonic plates move. In Scotland the
Highland Boundary Fault is the major geological fault
line cutting diagonally across the Highlands from Fort
William to Inverness. It is also known as the Great
Glen. 
Fetch  The distance travelled by wind or waves across open
water.
Flash flood 
A flash flood is a flood that occurs in a short period of
time after high intensity rainfall or a sudden snow
melt. A sudden increase in the level and velocity of
the water body is often characteristic of these events.
Page 323 of 354

Page 324

Tay Local Flood Risk Management Plan 
Annex 7 | 157 
Rising water levels in the river network can reach a
peak within minutes to a few hours of the onset of the
flood event, leaving a short time for warning or
actions.
Flashy watercourse 
A 'flashy' river or watercourse has a short lag time
(the delay between peak rainfall intensity and peak
river discharge), high peak discharge, and quickly
returns to average flow. Rivers with these
characteristics can be more likely to flood and leave
a short time for warning or actions. 
Flood 
A flood can be defined as the period of time flooding
is expected, occurs and drains away. It causes
significant adverse impacts on people, property,
environment or infrastructure and is not a result of
regular weather or infrastructure drainage. 
Flood bund  A constructed retaining wall, embankment or dyke
designed to prevent flooding. 
Flood defence 
Infrastructure, such as flood walls and embankments,
intended to protect an area against flooding to a
specified standard of protection. 
Flood extent  The area that has been affected by flooding, or is at
risk of flooding from one or more sources. 
Flood forecasting
SEPA operates a network of over 250 rainfall, river
and coastal monitoring stations throughout Scotland
that generate data 24 hours a day. This hydrological
information is combined with meteorological
information from the Met Office. A team of experts
then predict the likelihood and timing of river, coastal
and surface water flooding. This joint initiative
between SEPA and the Met Office forms the Scottish
Flood Forecasting Service.
Flood frequency  How often we expect a flood to happen (see
likelihood). 
Flood gate 
An adjustable, sometimes temporary, barrier used as
a flood defence to control the flow of water within a
water system or during a flood. 
Flood hazard  In terms of the FRM Act, hazard refers to the
characteristics (extent, depth, velocity) of a flood. 
Flood hazard map 
Required by the FRM Act to show information that
describes the nature of a flood in terms of the source,
extent, water level or depth and velocity of water,
where appropriate. 
Flood Prevention Scheme /
Flood Protection Scheme
(FPS) 
Flood defence measures (flood prevention schemes)
formerly promoted under the Flood Prevention
(Scotland) Act 1961 can now be taken forward under
the FRM Act by a local authority to reduce flood risk.
A flood protection scheme, as defined by the FRM
Act, is a scheme by a local authority for the
management of flood risk within the authority’s area. 
Page 324 of 354

Page 325

Tay Local Flood Risk Management Plan 
Annex 7 | 158 
Flood protection study 
A detailed assessment of an area for flood risk. The
study may assess what is at risk of flooding with
more accuracy and provide options for dealing with
the risk of flooding. 
Flood protection works 
Flood protection works can include the same flood
defence measures that would make up a flood
protection scheme but without the legal
requirements, process and protections that would
come by designating the works as a scheme. 
Flood risk 
A measure of the combination of the likelihood of
flooding occurring and the associated impacts on
people, the economy and the environment. 
Flood Risk Assessment
(FRA) 
Flood Risk Assessments are detailed studies of an
area where flood risk may be present. These are
often used to inform planning decisions, develop
flood schemes and they also contributed to the
National Flood Risk Assessment. 
Flood Risk Management
(Scotland) Act 2009 
(FRM Act) 
The flood risk management legislation for Scotland. It
transposes the EC Floods Directive into Scots Law
and aims to reduce the adverse consequences of
flooding on communities, the environment, cultural
heritage and economic activity. 
Flood risk management
cycle 
Under the FRM Act flood risk management planning
is to occur in six year cycles. The second cycle is
2022 – 2028. 
Flood Prevention
(Scotland) Act 1961 
The Flood Prevention (Scotland) Act 1961 gave local
authorities discretionary powers to make and build
flood prevention schemes. It was superseded by the
Flood Risk Management (Scotland) Act 2009. 
Flood Risk Management
Local Advisory Groups 
FRM Local Advisory Groups are stakeholder groups
convened to advise SEPA and lead local authorities
in the preparation of Flood Risk Management Plans.
SEPA and lead local authorities must have regard to
the advice they provide. 
Flood Risk Management
Plans (FRM Plans) 
A term used in the FRM Act. FRM Plans set out the
actions that will be taken to reduce flood risk in a
Local Plan District. They comprise Flood Risk
Management Strategies, developed by SEPA, and
Local Flood Risk Management Plans produced by
lead local authorities. 
Flood Risk Management
Flood Risk Management
Strategy 
(FRM Flood Risk
Management Strategy) 
Sets out a long-term vision for the overall reduction
of flood risk. They contain a summary of flood risk in
each Local Plan District, together with information on
catchment characteristics and a summary of
objectives and actions for Potentially Vulnerable
Areas. 
Flood risk map 
Builds on flood hazard maps providing detail on the
impacts of flooding on people, the economy and the
environment. 
Page 325 of 354

Page 326

Tay Local Flood Risk Management Plan 
Annex 7 | 159 
Flood wall  A flood defence feature used to defend an area from
flood water. 
Flood Warning area 
(FWA) 
A Flood Warning area is where SEPA operates a
formal Flood Monitoring Scheme to issue targeted
Flood Warning messages for properties located in
the area.
Flood warning scheme 
A flood warning scheme is the network of monitoring
on a coastal stretch or river, which provides SEPA
with the ability to issue Flood Warnings. 
Floodplain 
Area of land that borders a watercourse, an estuary
or the sea, over which water flows in time of flood, or
would naturally flow but for the presence of flood
defences and other structures where they exist. 
Floodplain storage 
Floodplains naturally store water during high flows.
Storage can be increased through natural or man-
made features to increase flood depth or slow flows
to reduce flooding elsewhere. 
Floods Directive 
European Directive 2007/60/EC on the Assessment
and Management of Flood Risks builds on and is
closely related to the Water Framework Directive
(see river basin management planning). It was
transposed into Scots Law by the Flood Risk
Management (Scotland) Act 2009. The Directive
requires Member States to assess if all watercourses
and coastlines are at risk from flooding, to map the
flood extent, assets and humans at risk in these
areas and to take adequate and coordinated
measures to reduce this flood risk.
Fluvial flooding  Flooding from a river or other watercourse. 
Gabion  A metal cage filled with rocks to walls often used in
river bank protection. 
Green infrastructure 
The European Commission defines green
infrastructure as “the use of ecosystems, green
spaces and water in strategic land use planning to
deliver environmental and quality of life benefits. It
includes parks, open spaces, playing fields,
woodlands, wetlands, road verges, allotments and
private gardens. Green infrastructure can contribute
to climate change mitigation and adaptation, natural
disaster risk mitigation, protection against flooding
and erosion as well as biodiversity conservation.”
See also ‘blue infrastructure’.
Groundwater flooding 
This type of flooding is caused by water rising up
from underlying rocks or flowing from springs.
Groundwater is generally a contributing factor to
flooding rather than the primary source. 
Hydrometric areas 
These are either whole river catchments having one
or more outlets to the sea or tidal estuary, or they
may include several connected river catchments
Page 326 of 354

Page 327

Tay Local Flood Risk Management Plan 
Annex 7 | 160 
having similar surface features but with separate tidal
outlets.xi There are 107 hydrometric areas in the UK,
45 of which are in Scotland. 
Indirect damages 
Defined in the appraisal process as damages
incurred due to the knock on effects of flooding such
as disruption, evacuation, costs to emergency
services, loss of income or earnings/industrial
production. (See also ‘direct damages’). 
Integrated catchment study 
(ICS) 
In urban areas, the causes of flooding are complex
because of the interactions between rivers, surface
water drainage and combined sewer systems and
tidal waters. Scottish Water works with SEPA and
local authorities to assess these interactions through
detailed studies. 
Land use planning 
(LUP) 
The process undertaken by public authorities to
identify, evaluate and decide on different options for
the use of land, including consideration of long term
economic, social and environmental objectives and
the implications for different communities and interest
groups. 
Lead authority
A local authority responsible for the production,
consultation, publication and review of a Local Flood
Risk Management Plan. 
Likelihood of flooding 
The chance of flooding occurring. 
High likelihood: A flood is likely to occur in the
defined area on average once in every ten years
(1:10). Or a 10% chance of happening in any one
year. 
Medium likelihood: A flood is likely to occur in the
defined area on average once in every two hundred
years (1:200). Or a 0.5% chance of happening in any
one year. 
Low likelihood: A flood is likely to occur in the
defined area on average once in every thousand
years (1:1000). Or a 0.1% chance of happening in
any one year. 
Local Development Plans 
Each planning authority area in Scotland is covered
by a Local Development Plan, which sets out where
most new developments are proposed and the
policies that will guide decision-making on planning
applications. The four main city regions in Scotland
(Aberdeen, Dundee, Edinburgh and Glasgow) are
also covered by a Strategic Development Plan which
sets out the long-term development of the city region
and deals with region-wide issues such as housing
and transport. 
Local Flood Risk
Management Plans 
(Local FRM Plan) 
Local Flood Risk Management Plans, produced by
lead local authorities, will take forward the objectives
and actions set out in Flood Risk Management
Strategies. They will provide detail on the funding,
Page 327 of 354

Page 328

Tay Local Flood Risk Management Plan 
Annex 7 | 161 
timeline of delivery, arrangements and coordination
of actions at the local level during each six year FRM
planning cycle. 
Local Nature Reserve 
Local nature reserves are areas of at least locally
important natural heritage, designated and managed
by local authorities to give people better
opportunities to learn about and enjoy nature close to
where they live. Local authorities select and
designate local nature reserves using their powers
under the National Parks and Access to the
Countryside Act 1949
Local Plan District (LPD)
Geographical areas for the purposes of flood risk
management planning. There are 14 Local Plan
Districts in Scotland. 
Local Plan District
Partnerships 
Each LPD has established a local partnership
comprised of local authorities, SEPA, Scottish Water
and others as appropriate. These partnerships are
distinct from the FRM Local Advisory Groups and
they retain clear responsibility for delivery of the FRM
actions set out in the Local Flood Risk Management
Plans. It is the local partnership that makes decisions
and supports the delivery of these plans. 
Maintenance
Sections 18 and 59 of the Flood Risk Management
(Scotland) Act 2009 put duties of watercourse
inspection, clearance and repair on local authorities.
In addition, local authorities may also be responsible
for maintenance of existing flood protection schemes
or defences.
Montane habitat  This habitat encompasses a range of natural or near-
natural vegetation occurring in the montane zone,
lying above or beyond the natural tree-line. 
National Flood
Management Advisory
Group 
(NFMAG) 
The National Flood Management Advisory Group
provides advice and support to SEPA and, where
required, Scottish Water, local authorities and other
responsible authorities on the production of FRM
Strategies and Local FRM Plans. 
National Flood Risk
Assessment 
(NFRA) 
A national analysis of flood risk from all sources of
flooding which also considers climate change
impacts. Completed in December 2011 this provides
the information required to undertake a strategic
approach to flood management that identifies areas
at flood risk that require further appraisal. The NFRA
will be reviewed and updated for the second cycle of
FRM Planning by December 2018. 
Natural flood management
(NFM) 
A set of flood management techniques that aim to
work with natural processes (or nature) to manage
flood risk. 
Non-residential properties 
Properties that are not used for people to live in,
such as shops or other commercial or industrial type
buildings. 
Page 328 of 354

Page 329

Tay Local Flood Risk Management Plan 
Annex 7 | 162 
Objectives 
Measurable goals relating to managing flood risk.
The Flood Risk Management Strategies for each of
the 14 Local Plan Districts in Scotland will set out
objectives to reduce flood risk and actions to achieve
those objectives.
Objective Target Area
Target areas are based on communities at risk of
flooding. These are situated within potentially
vulnerable areas and should benefit from actions to
reduce flood risk. Objectives and actions to manage
flooding have been set for each target area in the
flood risk management plans. To benefit the
community, actions may be applied outside the target
area.
One in 200 year flood  See ‘likelihood of flooding’ and ‘return period’. 
Planning policies
Current national planning policies, Scottish Planning
Policy and accompanying Planning Advice notes
restrict development within the floodplain and limit
exposure of new receptors to flood risk. In addition to
national policies, local planning policies may place
further requirements within their area of operation to
restrict inappropriate development and prevent
unacceptable risk.
Potentially Vulnerable
Areas 
(PVA) 
Catchments identified as being at risk of flooding and
where the impact of flooding is sufficient to justify
further assessment and appraisal. There were 243
PVAs identified by SEPA in the National Flood Risk
Assessment and these will be the focus of the first
FRM planning cycle. 
Probability 
The chance of a flood occurring within a given time.
This is also expressed as likelihood of flooding as in
the SEPA flood maps. 
Property level protection 
Property level protection includes flood gates,
sandbags and other temporary barriers that can be
used to prevent water from entering individual
properties during a flood. 
Property level protection
scheme 
Some responsible authorities may have a formal
scheme to provide, install and maintain property level
protection for properties. 
Q&S
Quality and Standards (Q&S) is the process,
governing costs and outputs, through which the
planning and delivery of improvements to the public
drinking water and sewerage services in Scotland is
carried out 
Ramsar sites 
Ramsar sites are wetlands of international
importance designated under the Ramsar
Convention. 
Receptor 
Refers to the entity that may be impacted by flooding
(a person, property, infrastructure or habitat). The
vulnerability of a receptor can be modified by
increasing its resilience to flooding. 
Page 329 of 354

Page 330

Tay Local Flood Risk Management Plan 
Annex 7 | 163 
Residual risk 
The risk that remains after risk management and
mitigation. This may include risk due to very severe
(above design standard) storms or risks from
unforeseen hazards. 
Resilience  The ability of an individual, community or system to
recover from flooding. 
Responsible authority 
Designated under the FRM (Scotland) Act 2009 and
associated legislation as local authorities, Scottish
Water and, from 21 December 2013, the National
Park Authorities and Forestry and Land Scotland.
Responsible authorities, along with SEPA and
Scottish Ministers, have specific duties in relation to
their flood risk related functions. 
Return period  The average period of time between occurrences of
a flood event. The longer the return period, the rarer
the event. (See also ‘likelihood of flooding’.) 
Revetment 
Sloping structures placed on banks or at the foot of
cliffs in such a way as to deflect the energy of
incoming water.
Riparian 
The riparian area is the interface between land and a
river or stream. For the purposes of FRM this
commonly refers to the riparian owner, which
denotes ownership of the land area beside a river or
stream. 
River basin district 
Geographic areas over which River Basin
Management and Flood Risk Management Plans are
prepared. In Scotland there are two River Basin
Districts identified under the Water Environment and
Water Services (Scotland) Act 2003 (WEWS Act) -
one for the Solway/Tweed area and one covering the
rest of Scotland. 
River basin management
planning 
(RBMP) 
The Water Environment and Water Services
(Scotland) Act 2003 transposed the European Water
Framework Directive into Scots law. The Act created
the River Basin Management Planning process to
achieve environmental improvements to protect and
improve our water environment. It also provided for
regulations to control the negative impacts of all
activities likely to have an impact on the water
environment. 
Runoff reduction 
Actions within a catchment or sub-catchment to
reduce the amount of runoff during rainfall events.
This can include intercepting rainfall, storing water,
diverting flows or encouraging infiltration. 
Scottish Advisory and
Implementation Forum for
Flooding 
(SAIFF) 
The stakeholder forum on flooding set up by the
Scottish Government to ensure legislative and policy
aims are met and to provide a platform for sharing
expertise and developing common aspirations and
approaches to reducing the impact of flooding on
Page 330 of 354

Page 331

Tay Local Flood Risk Management Plan 
Annex 7 | 164 
Scotland’s communities, environment, cultural
heritage and economy. 
Scottish Government’s
Rural Payments and
Inspections Directorate 
Part of the Scottish Government which has the most
direct dealings with Scotland’s land managers,
including processing grant applications and
payments, carrying out inspections, plant health visits
and estate management. 
Sediment balance 
Within a river where erosion and deposition
processes are equal over the medium to long-term
resulting in channel dimensions (width, depth, slope)
that are relatively stable. 
Self help
Self help actions can be undertaken by any
individuals, businesses, organisations or
communities at risk of flooding. They are applicable
to all sources, frequency and scales of flooding. They
focus on awareness raising and understanding of
flood risk.
Sewer flooding (and other
artificial drainage system
flooding) 
Flooding as a result of the sewer or other artificial
drainage system (e.g. road drainage) capacity being
exceeded by rainfall runoff or when the drainage
system cannot discharge water at the outfall due to
high water levels (river and sea levels) in receiving
waters. 
Shoreline Management
Plan 
(SMP) 
A Shoreline Management Plan is a large scale
assessment of the coastal flood and erosion risks to
people and the developed, historic and natural
environment. It sets out a long-term framework for
the management of these risks in a sustainable
manner. 
Site of Special Scientific
Interest 
(SSSI) 
Sites of Special Scientific Interest are protected by
law under the Nature Conservation (Scotland) Act
2004 to conserve their plants, animals and habitats,
rocks and landforms. 
Site protection plans
Site protection plans are developed to identify
whether normal operation of a facility can be
maintained during a flood. This may be due to
existing protection or resilience of the facility or the
network.
Source of flooding  The type of flooding. This can be coastal, river,
surface water or groundwater. 
Special Area of
Conservation 
(SAC) 
Special Areas of Conservation are strictly protected
sites designated under the European Habitats
Directive. The Directive requires the establishment of
a European network of protected areas which are
internationally important for threatened habitats and
species. 
Special Protection Areas 
(SPA) 
Special Protection Areas are strictly protected sites
classified in accordance with the European Birds
Directive. They are classified for rare and vulnerable
Page 331 of 354

Page 332

Tay Local Flood Risk Management Plan 
Annex 7 | 165 
birds (as listed in the Directive), and for regularly
occurring migratory species
SR10 / SR15
SR10 and SR15 are Scottish Water’s investment
programmes. SR10 covered the period 2010 -2015
and SR15 covers 2015-2021.  For more information
on their investment programme please see
https://www.scottishwater.co.uk/about-
us/publications/strategic-projections
Standard of protection 
(SoP) 
The flood event return period above which significant
damage and possible failure of the flood defences
could occur. 
Storage area 
A feature that can be used to store floodwater, this
can be natural in the form of low lying land or
manmade such as a large reservoir or modified
landform. 
Strategic Environmental
Assessment 
(SEA) 
A process for the early identification and assessment
of the likely significant environmental effects, positive
and negative, of activities. Often considered before
actions are approved or adopted. 
Strategic Flood Risk
Assessment 
(SFRA) 
A Strategic Flood Risk Assessment is designed for
the purposes of specifically informing the
Development Plan Process. A SFRA involves the
collection, analysis and presentation of all existing
and readily available flood risk information (from any
source) for the area of interest. It constitutes a
strategic overview of flood risk. 
Strategic mapping and
modelling
Strategic mapping and modelling actions have been
identified in locations where SEPA is planning to
undertake additional modelling or analysis of
catchments and coastlines, working collaboratively
with local authorities where appropriate, to improve
the national understanding of flood risk.
Surcharge 
Watercourses and culverts can carry a limited
amount of water. When they can no longer cope,
they overflow, or ‘surcharge’. 
Surface water flooding 
Flooding that occurs when rainwater does not drain
away through the normal drainage systems or soak
into the ground, but lies on or flows over the ground
instead
Surface water management
plan 
(SWMP) 
A plan that takes an integrated approach to drainage
accounting for all aspects of urban drainage systems
and produces long term and sustainable actions. The
aim is to ensure that during a flood the flows created
can be managed in a way that will cause minimum
harm to people, buildings, the environment and
business. 
Surface water plan/study
The management of flooding from surface water
sewers, drains, small watercourses and ditches that
occurs, primarily in urban areas, during heavy
rainfall. FRM Strategy actions in this category
Page 332 of 354

Page 333

Tay Local Flood Risk Management Plan 
Annex 7 | 166 
include: Surface Water Management Plans,
Integrated Catchment Studies and assessment of
flood risk from sewerage systems (FRM Act Section
16) by Scottish Water. These have been selected as
appropriate for each Potentially Vulnerable Area.
Surface water runoff  The flow of water from rain, snow melt or other
sources over land.
Sustainable flood risk
management 
An approach which involves taking actions now to
manage the risk of flooding that are robust enough to
stand the test of time. There are three pillars of
sustainability that must be considered -
environmental, social and economic. 
Sustainable drainage
systems 
(SuDS) 
A set of techniques designed to slow the flow of
water. They can contribute to reducing flood risk by
absorbing some of the initial rainfall and then
releasing it gradually, thereby reducing the flood
peak and helping to mitigate downstream problems.
SuDS encourage us to take account of quality,
quantity and amenity / biodiversity. 
Target Area See ‘Objective Target Area’
Training wall  A wall, bank or jetty built to confine and direct the
flow of water. 
UK Climate Change
Projections 
(UKCP09) 
The leading source of climate change information for
the UK. It can help users to assess their climate risks
and plan how to adapt to a changing climate. 
Utility assets 
Within the FRM Strategies this refers to electricity
sub stations, mineral and fuel extraction sites,
telephone assets, television and radio assets. 
Vulnerability 
A measure of how likely someone or something is to
suffer long-term damage as a result of flooding. It is a
combination of the likelihood of suffering harm or
damage during a flood (susceptibility) and the ability
to recover following a flood (resilience). 
Wave energy dissipation  Process by which a wave loses its mechanical
energy. 
Wave overtopping 
Wave overtopping takes place when waves meet a
submerged or emerged reef or structure and pass
over it. 
Page 333 of 354

Page 334

Tay Local Flood Risk Management Plan 
Annex 8 | 167 
Annex 8: Licencing & Acknowledgements
The information described in this Annex relates to the Figures and Maps that have
been generated by SEPA and have been reproduced in this Local Flood Risk
Management Plan from the Tay Flood Risk Management Strategy. The Tay Local
Plan District Partners gratefully acknowledge the cooperation and input that various
parties have provided, including inter alia, the following organisations: 
SEPA
Local authorities acknowledge the inclusion of text generated by SEPA in
preparation of the Tay Flood Risk Management Plan. Figures and Maps produced by
SEPA for the Tay Flood Risk Management Plan have been reproduced in the Tay
Local Flood Risk Management Plan with authorisation from SEPA under SEPA
Licence number 100016991 (2022). 
Ordnance Survey
These reproduced maps are based upon Ordnance Survey material with the
permission of Ordnance Survey on behalf of the Controller of Her Majesty’s
Stationery Office © Crown Copyright. Any unauthorised reproduction infringes Crown
copyright and may lead to prosecution or civil proceedings. SEPA Licence number
100016991 (2022). Perth & Kinross Council Licence number 100016971 (2022). 
© Crown copyright and database rights 2022 OS 100016971. You are permitted to
use this data solely to enable you to respond to, or interact with, the organisation that
provided you with the data. You are not permitted to copy, sub-licence, distribute or
sell any of this data to third parties in any form. 
The Centre for Ecology and Hydrology
Some features of these reproduced maps are based upon digital spatial data
licensed from the Centre for Ecology and Hydrology © NERC (CEH) and third party
licensors. 
The Met Office
Data provided by The Met Office has been used by SEPA under licence in some
areas of flood risk information production. ©Crown Copyright (2022), the Met Office. 
The James Hutton Institute
Data provided to SEPA under license from the James Hutton Institute has been
applied in production of flood risk management information. Copyright © The James
Hutton Institute and third party licensors. 
British Geological Survey
Flood risk information has been derived by SEPA from BGS digital data under
license. British Geological Survey ©NERC 
Local authorities
Lead authorities acknowledge the provision of flood models and other supporting
data and information from local authorities in Scotland and their collaboration in the
production of flood risk management information. 
Page 334 of 354

Page 335

Tay Local Flood Risk Management Plan 
Annex 8 | 168 
Scottish Water
Local authorities acknowledge the inclusion of surface water flooding data generated
by Scottish Water in preparation of flood risk information. 
Page 335 of 354

Page 336

Page 336 of 354

Page 337

02/07/09 (Dundee, Broughty Ferry and Invergowrie) 
This area is designated as a potentially vulnerable area due to flood risk in Broughty
Ferry, Dundee and Invergowrie. There is flood risk from all sources including coastal
from the Firth of Tay, surface water and small watercourses. A flood protection
scheme has recently been completed in Dundee to protect the city from coastal
flooding. There is a long history of flooding in this area. This includes recent flooding
due to wave overtopping in Dundee during Storm Ciara, and frequent surface water
flooding. 
There are 3 target areas in this potentially vulnerable area, which have been the
focus of further assessment. These are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below
List of target areas 
Invergowrie   (target area 235) 
3
Page 337 of 354

Page 338

Invergowrie (Objective Target Area 235) 
Summary Location Map
Invergowrie lies on the north bank
of the Firth of Tay, west of
Dundee, within the Perth and
Kinross Council area. The main
source of flooding is river flooding
from the Invergowrie Burn and
there is also some risk from
surface water. An on-going
natural flood management flood
study carried out by the local
authority indicates that there are
approximately 10 homes and
businesses currently at risk of
flooding and that this is likely to
increase to 18 homes and
businesses by the 2080s due to
climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment of surface water flooding was improved by a
surface water management plan and a sewer flood risk assessment. The surface
water management plan concluded that the majority of flood risk in Invergowrie was
from river sources. An integrated catchment study was also carried out but this
concluded that there is no interaction between sewer, river and surface water
flooding. 
There is a history of flooding in the area. Records are limited but the first flood
recorded occurred in August 2004 when the Invergowrie Burn overflowed, affecting
properties on Main Street, Burnside Road, Balruddery Farm and the road at Boniface
Road and Boniface Place. In January 2011 the Invergowrie Burn overflowed,
affecting roads and a residential property. The most recent flood was recorded in
January 2016 when 1 residential property flooded. 
Objectives and Actions in the Comrie Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
Page 338 of 354

Page 339

SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. 
Action (ID): FLOOD STUDY (Ref: 23501)
Objective (ID): Reduce the risk of surface water and river flooding from
the Invergowrie Burn in Invergowrie (Ref: 2353).
Delivery Lead: Perth and Kinross Council
Status: Complete Planned Delivery Period: 2022
Description:
A natural flood management study for the Invergowrie Burn was
included in the Cycle 1 Tay Estuary Local Flood Risk
Management Plan. The study, which commenced in March
2020, was administered by Perth and Kinross Council and
awarded to consulting engineers, Sweco UK Ltd. The study was
completed following community engagement in September
2022.
Coordination
Arrangement:
Perth and Kinross Council coordinated the natural flood
management study with Dundee City Council, Angus Council
and other partners in the Tay Estuary & Montrose Basin local
plan district partnership.
Funding
Arrangement:
Funding for the flood study was allocated from Perth and
Kinross Council’s revenue budget. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 23502)
Objective (ID): Reduce the risk of surface water and river flooding from the
Invergowrie Burn in Invergowrie (Ref: 2353)
Delivery Lead: Scottish Water
Status: Not Started Planned Delivery Period: 2023-2025
Description:
Scottish Water will undertake a modelling assessment in the
Hatton sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Outputs of this modelling assessment will be shared with local
authorities and SEPA. 
Funding
Arrangement:
Funding for this action is secured through Scottish Water's
business plan. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 23503)
Objective (ID): Prepare for current flood risk and future flooding as a result
of climate change in Invergowrie (Ref: 2352)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Page 339 of 354

Page 340

Description:
Community engagement will continue to be carried out in the
area by SEPA and the responsible authorities to raise
awareness of flood risk. Community engagement activity will
continue in connection with on-going projects and activities.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Estuary and
Montrose Basin Local Plan District Partnership. Information will
be disseminated through website, social media and other
community engagement activity.
Funding
Arrangement:
Community engagement activities will subject to funding from
Perth and Kinross Council’s revenue budget. SEPA's community
engagement activities are funded by the Scottish Government
through SEPA’s grant in aid settlement. Scottish Water is funded
by customer charges as set by their economic regulator; all
business activities required under this action by Scottish Water
are accounted for in their capital or operational expenditure. 
Page 340 of 354

Page 341

2.4.3 PVA 02/09/03 (Blackford) 
This area is designated as a potentially vulnerable area due to flood risk to
Blackford. 
The main source of flooding in Blackford is river flooding from the Danny Burn and
other small watercourses. There is some history of flooding. Most recently, two
homes and one business were flooded in February 2020, while high flow events
occurred in August 2019 and February 2021.
There is 1 target area in this potentially vulnerable area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below.  
List of target areas 
Blackford  (target area 198) 
3
Page 341 of 354

Page 342

Local Flood Risk Management plan datasheet
2.4.3.1  Blackford 198 
Summary Location Map
The village of Blackford is
located around 8km from
Auchterarder and within
the Perth and Kinross
Council area. The main
source of flooding in
Blackford is river flooding
from the Danny Burn and
small watercourses. The
local authority has carried
out a flood study in this
area which estimated that
there are approximately 32
homes and 6 businesses
currently at risk from
flooding.
© Crown copyright and database rights 2022 Ordnance Survey
100020780 (Stirling Council). You are not permitted to copy, sub-
licence, distribute or sell any of this data to third parties in any form.  
What is the Current
understanding of Flood risk
This section provides a summary of information,
which has helped to develop an understanding of
flood risk in the area. Since 2011 SEPA has
developed and updated national level assessments
of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding
was improved by the Blackford Flood Study. There
are records of flooding in this area. On 13 December
2006 properties in Abercairney Place, Blackford and
surrounding areas were flooded. Recent notable
floods include August 2019 and February 2020. In
February 2020, 2 homes and 1 business flooded
following Storm Dennis 
Objective ID Description
Avoid flood risk 1981 Avoid development that increases flood risk in
Blackford
Prepare for flooding 1982 Prepare for current flood risk and future flooding as
a result of climate change in Blackford
Page 342 of 354

Page 343

Reduce flood risk 1983 Reduce the risk of river flooding from the Allan
Water, Danny Burn, Burn of Ogilvie, Back Burn
and Kinpauch Burn in Backford. 
Action ID Blackford 19801
Action Type Flood Protection Scheme
Action Delivery
Lead
Perth and
Kinross
Council
Indicative
Delivery
To be confirmed
Description A flood protection scheme has been proposed in this area. The
proposed scheme involves a combination of river flow
diversions, direct flood defences and natural flood
management. It aims to provide a 1 in 200-year standard of
protection. Current and long-term flood risk will be further
considered at the design stage including the impacts of climate
change and scheme adaptability. The outline design for the
Blackford Flood Protection Scheme will be progressed, in line
with the recommendations of the Blackford Flood Study. This
work will also include ongoing community engagement as the
project progresses. 
Once the flood protection scheme has been confirmed and the
detailed design completed, the next stages will involve
procurement and construction. 
As built drawings will be made available to SEPA, for inclusion in
the Scottish Flood Defence Asset Database, flood map updates
and flood warning scheme updates. 
Routine inspections and maintenance of the Blackford Flood
Protection Scheme will commence when the scheme is complete
in accordance with the inspection and maintenance regime.
Funding The delivery of the Blackford Flood Protection Scheme is subject
to capital funding being made available (up to 80% capital grant
funding from the Scottish Government with the remaining funding
being provided from Perth & Kinross Council's capital
programme).
Coordination The Blackford Flood Protection Scheme will be coordinated
through the Forth Local Plan District Partnership. 
SEPA will work with the local authority on the potential to
coordinate this action with an update to SFDAD.
Action The outline design of the flood scheme will commence once
capital funding is secured. 
Action ID Blackford 19802
Action Type Community Engagement 
Action Delivery
Lead
SEPA and
Responsible
Authorities
Indicative
Delivery
On-going
Description Community engagement will continue in connection with
ongoing projects and activities. Perth and Kinross Council will
continue to coordinate with the Blackford Community Council on
Page 343 of 354

Page 344

a priority needs basis where resources allow.
Funding Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget. SEPA's community
engagement activities are funded by the Scottish Government
through SEPA’s grant in aid settlement. Scottish Water is funded
by customer charges as set by their economic regulator; all
business activities required under this action by Scottish Water
are accounted for in their capital or operational expenditure.
Coordination Community engagement will be coordinated through the Local
Plan District partnership between SEPA and the responsible
authorities. 
SEPA and the responsible authorities will use any studies,
projects and flood schemes to engage with communities and
raise awareness of flood risk. 
Communications activity will be coordinated through existing
arrangements within Local Plan District Partnerships. Information
will be disseminated through website, social media and other
community engagement activity.
Action Community engagement will continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. 
Action ID  Blackford 19803
Action Type Community Resilience Group
Action Delivery
Lead
Community
Group
Indicative
Delivery
On-going
Description Perth and Kinross Council will continue to communicate with and
support the Blackford Community Council on flood risk matters.
The resilience plans should be updated regularly by the group
and this will be supported by the Council
Funding Funding for Community resilience groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding.
Coordination Perth and Kinross Council will continue to coordinate with the
Blackford Community Council on a priority needs basis where
resources allow.
Action The group of community volunteers will work to prepare and put
in practice their Community Resilience Plan with support from
Perth and Kinross Council. 
Page 344 of 354

Page 345

2.4.4 Kinross, Milnathort And Glenrothes (02/10/03) 
Kinross, Milnathort and Glenrothes have been designated as a potentially vulnerable
area due to the various risks of flooding, within these areas. Surface water pluvial
flooding is the most prevalent flooding facing Glenrothes and Markinch, whilst fluvial
flooding from the Lochty Burn is the most prevalent flooding risk facing Kinglassie. The
main source of flooding in Kinross is from surface water and river flooding from the
South Queich, the Gelly Burn and the Clash Burn. The main source of flooding in
Milnathort is river flooding from the Back Burn, however there is also a risk of surface
water flooding.
There are three target areas within this potentially vulnerable area, which have been
the focus of further assessment. These are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
List of target areas   
Kinross   (target area 239)
Milnathort  (target area 303)  
3
Page 345 of 354

Page 346

Local Flood Risk Management plan datasheet
Kinross (target area 239)  
Summary Location Map
The town of Kinross is located
around 20km south of Perth. The
main sources of flooding in Kinross
are surface water and river flooding
from the South Queich, Gelly Burn
and Clash Burn. The local authority
has carried out a flood study in this
area in support of the proposed flood
scheme. The study indicates that
129 homes and 55 businesses are
currently at risk of flooding from the
South Queich, the Gelly Burn and
the Clash Burn.   
Current understanding of Flood Risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is improved by flood study
work supporting the ongoing development of proposals for the South Kinross
Flood Protection Scheme. The understanding of surface water flooding was also
improved by Scottish Water’s sewer flood risk assessment. 
There is a long record of flooding in this target area. Flooding occurred in January
1993, January 1999, December 2006, January and August 2008 and November
2009. In February 2020 a number of homes and roads suffered river flooding. Most
recently, flooding was recorded in August 2020 when homes flooded as a result of
unprecedented rainfall in the area.   
Objective ID Description
Avoid flood risk 2391 Avoid inappropriate development that increases
flood risk in Kinross
Avoid flood risk 2392 Avoid an increase in flood risk by the appropriate
management and maintenance of the South
Kinross Flood Protection Scheme
Page 346 of 354

Page 347

Prepare for flooding 2393 Prepare for current flood risk and future flooding
as a result of climate change in Kinross
Reduce flood risk 2394 Reduce the risk of river flooding from the South
Queich, Gelly Burn and Clash Burn in South
Kinross 
Reduce flood risk 2395 Reduce the risk of surface water flooding in
Kinross 
Action ID Kinross 23901
Action Type Flood Protection Scheme
Action Delivery
Lead
Perth and Kinross
Council
Indicative Delivery 2022 - 2025
Description The development of the outline design for the South Kinross
Flood Protection Scheme will continue and will consider long
term flood risk and climate change. The development of the
proposals will also be informed by community engagement.
The scheme will then progress to the statutory process set out
under the Flood Risk Management (Scotland) Act 2009. The
detailed design will be completed thereafter. 
Following completion of the detailed design, the proposed
scheme will be procured and will progress to construction. 
As built drawings will be made available to SEPA, for inclusion
in the Scottish Flood Defence Asset Database, flood map
updates and flood warning scheme updates.
Funding The South Kinross Flood Protection Scheme will be subject to
available capital funding (up to 80% capital grant funding from
the Scottish Government with the remaining funding being
provided from Perth & Kinross Council's capital programme).
Coordination The South Kinross Flood Protection Scheme will be
coordinated through the Forth Estuary Local Plan District
Partnership. 
Action ID Kinross 23902
Action Type Maintain Flood Protection Scheme
Action Delivery
Lead
Perth and Kinross
Council
Indicative Delivery On-going
Description Once built, Perth and Kinross Council will implement an
inspection and maintenance regime for the South Kinross
Flood Protection Scheme.
Funding The maintenance of flood protection schemes will be subject
to funding from Perth and Kinross Council's revenue budget.
Page 347 of 354

Page 348

Coordination Perth & Kinross Council's Roads Maintenance Partnership will
maintain any existing flood protection schemes and works
through a programme of inspections carried out in accordance
with the recommendations set out in the scheme maintenance
manuals. Maintenance works will be coordinated with SEPA,
NatureScot, landowners and other stakeholders as required. 
Action ID Kinross 23903
Action Type Sewer Flood Risk Assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2023 - 2025
Description Scottish Water will undertake a modelling assessment in the
Kinross sewer catchment to improve knowledge and
understanding of flood risk in this area as required under
Section 16 of the Flood Risk Management (Scotland) Act 2009
Funding Funding for this action is secured within Scottish Water's
business plan.
Coordination Outputs of this modelling assessment will be shared with local
authorities and SEPA.  
Action ID Kinross 23904
Action Type Surface Water Management Plan
Action Delivery
Lead
Perth and Kinross
Council
Indicative Delivery 2024 - 2026
Description Perth and Kinross Council will develop a surface water
management plan for Kinross. This will improve the
understanding of surface water flood risk, and in the longer
term look at possible action to manage the risk. The results of
the sewer flood risk assessment will be considered. Current
and long term flood risk will be considered and if climate
change impacts are found to be significant, surface water
management will include adaptive planning.
Funding The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget.
Coordination The surface water management plan is programmed to
commence in the 2024/25 financial year. Perth and Kinross
Council will engage consulting engineers to investigate the
surface water flood risk and identify potential options for
managing that risk. The surface water management plan will
be coordinated through the Forth Estuary Local Plan District
Partnership.
Scottish Water will work with and support surface water
management planning through ensuring that best available
Page 348 of 354

Page 349

knowledge and data is used to input into the surface water
management plans. 
Action ID Kinross 23905
Action Type Community Engagement
Action Delivery
Lead
SEPA and
Responsible
Authorities
Indicative Delivery On-going
Description Community engagement will continue in connection with on-
going projects and activities. This will include engaging with
the community on the development of the flood scheme
proposals and the surface water management plan (Action ID's
23901 & 23904).
Funding Community engagement activities will be subject to funding
from Perth and Kinross Council’s revenue budget. SEPA's
community engagement activities are funded by the Scottish
Government through SEPA’s grant in aid settlement. Scottish
Water is funded by customer charges as set by their economic
regulator; all business activities required under this action by
Scottish Water are accounted for in their capital or operational
expenditure.
Coordination The action delivery lead is Perth and Kinross Council.
Awareness raising and community engagement will take place
around any projects and will be coordinated through the Local
Plan District Partnership. 
Action ID Kinross 23906
Action Type Community Resilience Group
Action Delivery
Lead
Community Indicative Delivery On-going
Description Perth and Kinross Council will continue to liaise with the
Kinross Flood Resilience Group.
Funding Funding for Community resilience groups will be provided by
private individuals, businesses, organisations or communities
at risk of flooding.
Coordination Perth and Kinross Council will work with the Kinross Flood
Resilience Group to reduce flood risk, improve preparedness
and increase resilience against flooding. The Council will
continue to co-ordinate with the Kinross Flood Resilience
Group on a priority needs basis where resources allow.
The Council will coordinate community resilience groups with
any related actions.  
Page 349 of 354

Page 350

Local Flood Risk Management plan datasheet
Milnathort (target area 303)  
Summary Location Map
Milnathort is a small town in Perth
and Kinross located just north of
Kinross. The main source of
flooding in Milnathort is river
flooding, however there is also a
risk of surface water flooding.
There are approximately 200
people and 130 properties
currently at risk from flooding. This
is likely to increase to 300 people
and 180 properties by the 2080s
due to climate change. A flood
protection scheme is in place in
the area, protecting homes and
businesses to a 1 in 100 year
standard of protection.   
Current understanding of Flood risk
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for surface water is improved by an on-going
surface water management plan, a sewer flood risk assessment and flood study
work in support of a proposed surface water flood protection scheme. National
understanding of river flooding is improved by flood study work carried out for the
existing Milnathort Flood Protection Scheme on the Back Burn.
There is a long record of flooding in this area. The Back Burn flooded in January
1993, affecting properties in the town centre. In December 2006 a prolonged period
of heavy rainfall caused flooding to houses and a local pub, necessitating residents
to be evacuated from their homes. The most recent significant flood was recorded
in July 2013 when surface water flooded a number of homes and businesses. Since
then, smaller scale surface water flooding occurred in 2020 but did not cause any
damage to properties. 
Page 350 of 354

Page 351

Objective ID Description
Avoid flood risk 3031 Avoid inappropriate development that increases
flood risk in Milnathort
Avoid flood risk 3032 Avoid an increase in flood risk by the appropriate
management and maintenance of the flood
protection schemes in Milnathort
Prepare for flooding 3033 Prepare for current flood risk and future flooding
as a result of climate change in Milnathort
Reduce flood risk 3034 Reduce the risk of surface water in Milnathort 
Action ID Milnathort 30301
Action Type Flood Protection Scheme
Action Delivery
Lead
Perth and Kinross
Council
Indicative Delivery 2022 - 2025
Description The development of the outline design for the Milnathort
Surface Water Flood Protection Scheme will continue and will
consider long term flood risk and climate change. The
development of the proposals will be informed by community
engagement. The scheme will then progress to the statutory
process set out under the Flood Risk Management (Scotland)
Act. The detailed design will be completed thereafter. 
Following completion of the detailed design, the proposed
scheme will be procured and will progress to construction. 
As built drawings will be made available to SEPA, for inclusion
in the Scottish Flood Defence Asset Database, flood map
updates and flood warning scheme updates.
Funding The Milnathort Surface Water Flood Protection Scheme will be
subject to available capital funding (up to 80% capital grant
funding from the Scottish Government with the remaining
funding being provided from Perth & Kinross Council's capital
programme).
Coordination The Milnathort Surface Water Flood Protection Scheme will
continue to be coordinated through the Forth Estuary Local
Plan District Partnership. 
Action ID Milnathort 30302
Action Type Maintain Flood Protection Scheme
Action Delivery
Lead
Perth and Kinross
Council
Indicative Delivery On-going
Page 351 of 354

Page 352

Description Maintenance of the existing Milnathort Flood Protection
Schemes (on the Back Burn) will continue in accordance with
the inspection and maintenance regime.
Maintenance of the new Milnathort Surface Water Flood
Protection Scheme will commence once construction of the
scheme is complete.
Funding The maintenance of flood protection schemes will be subject
to funding from Perth and Kinross Council's revenue budget.
Coordination Perth & Kinross Council's Roads Maintenance Partnership will
maintain any existing flood protection schemes and works
through a programme of inspections carried out in accordance
with the recommendations set out in the scheme maintenance
manuals. Maintenance works will be coordinated with SEPA,
SNH, landowners and other stakeholders as required. The
maintenance of the flood scheme/works will also be
coordinated with related actions.  
Action ID Milnathort 30303
Action Type Sewer Flood Risk Assessment
Action Delivery
Lead
Scottish Water Indicative Delivery 2024 - 2026
Description Scottish Water will undertake a modelling assessment in the
Milnathort sewer catchment to improve knowledge and
understanding of flood risk in this area as required under
Section 16 of the Flood Risk Management (Scotland) Act 2009.
Funding Funding for this action is secured within Scottish Water's
business plan.
Coordination Outputs of this modelling assessment will be shared with local
authorities and SEPA.  
Action ID Milnathort 30304
Action Type Surface Water Management Plan
Action Delivery
Lead
Perth and Kinross
Council
Indicative Delivery 2022 - 2023
Description The development of a surface water management plan for
Milnathort in on-going. This is being coordinated with the
development of the proposed Milnathort Surface Water Flood
Protection Scheme (Action ID 30301). 
Current and long term flood risk is being considered and, if
climate change impacts are found to be significant, the plan
will consider how the area can adapt to increased flood risk in
the future.
Page 352 of 354

Page 353

Funding The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget.
Coordination Work to develop a surface water management plan is on-
going. Perth and Kinross Council engaged consulting
engineers, Sweco UK Ltd, to investigate the surface water
flood risk and identify potential options for managing that risk.
The plan/study will be coordinated through the Forth Estuary
Local Plan District Partnership.
Scottish Water will work with and support surface water
management planning through ensuring that best available
knowledge and data is used to input into the surface water
management plans.  
Action ID Milnathort 30305
Action Type Community Engagement
Action Delivery
Lead
SEPA and
Responsible
authorities
Indicative Delivery On-going
Description Community engagement will continue in connection with on-
going projects and activities. This will include engaging with
the community on the development of the flood scheme
proposals and the surface water management plan (Action ID's
30301 & 30304).
Funding Community engagement activities will be subject to funding
from Perth and Kinross Council’s revenue budgets. SEPA's
community engagement activities are funded by the Scottish
Government through SEPA’s grant in aid settlement. Scottish
Water is funded by customer charges as set by their economic
regulator, all business activities required under this action by
Scottish Water are accounted for in their capital or operational
expenditure.
Coordination Community engagement will be coordinated through the Local
Plan District partnership between SEPA and the responsible
authorities. SEPA and the responsible authorities will use any
studies, projects and flood schemes to engage with
communities and raise awareness of flood risk.
Communications activity will be coordinated through existing
arrangements within Local Plan District Partnerships.
Information will be disseminated through website, social media
and other community engagement activity.   
Page 353 of 354

Page 354

Page 354 of 354