02/07/09 (Dundee, Broughty Ferry and Invergowrie) 
This area is designated as a potentially vulnerable area due to flood risk in Broughty
Ferry, Dundee and Invergowrie. There is flood risk from all sources including coastal
from the Firth of Tay, surface water and small watercourses. A flood protection
scheme has recently been completed in Dundee to protect the city from coastal
flooding. There is a long history of flooding in this area. This includes recent flooding
due to wave overtopping in Dundee during Storm Ciara, and frequent surface water
flooding. 
There are 3 target areas in this potentially vulnerable area, which have been the
focus of further assessment. These are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below
List of target areas 
Invergowrie   (target area 235)

Page 2

Invergowrie (Objective Target Area 235) 
Summary Location Map
Invergowrie lies on the north bank
of the Firth of Tay, west of
Dundee, within the Perth and
Kinross Council area. The main
source of flooding is river flooding
from the Invergowrie Burn and
there is also some risk from
surface water. An on-going
natural flood management flood
study carried out by the local
authority indicates that there are
approximately 10 homes and
businesses currently at risk of
flooding and that this is likely to
increase to 18 homes and
businesses by the 2080s due to
climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment of surface water flooding was improved by a
surface water management plan and a sewer flood risk assessment. The surface
water management plan concluded that the majority of flood risk in Invergowrie was
from river sources. An integrated catchment study was also carried out but this
concluded that there is no interaction between sewer, river and surface water
flooding. 
There is a history of flooding in the area. Records are limited but the first flood
recorded occurred in August 2004 when the Invergowrie Burn overflowed, affecting
properties on Main Street, Burnside Road, Balruddery Farm and the road at Boniface
Road and Boniface Place. In January 2011 the Invergowrie Burn overflowed,
affecting roads and a residential property. The most recent flood was recorded in
January 2016 when 1 residential property flooded. 
Objectives and Actions in the Comrie Objective Target Area 
The objectives and actions for this target area are set out in the tables below.

Page 3

SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. 
Action (ID): FLOOD STUDY (Ref: 23501)
Objective (ID): Reduce the risk of surface water and river flooding from
the Invergowrie Burn in Invergowrie (Ref: 2353).
Delivery Lead: Perth and Kinross Council
Status: Complete Planned Delivery Period: 2022
Description:
A natural flood management study for the Invergowrie Burn was
included in the Cycle 1 Tay Estuary Local Flood Risk
Management Plan. The study, which commenced in March
2020, was administered by Perth and Kinross Council and
awarded to consulting engineers, Sweco UK Ltd. The study was
completed following community engagement in September
2022.
Coordination
Arrangement:
Perth and Kinross Council coordinated the natural flood
management study with Dundee City Council, Angus Council
and other partners in the Tay Estuary & Montrose Basin local
plan district partnership.
Funding
Arrangement:
Funding for the flood study was allocated from Perth and
Kinross Council’s revenue budget. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 23502)
Objective (ID): Reduce the risk of surface water and river flooding from the
Invergowrie Burn in Invergowrie (Ref: 2353)
Delivery Lead: Scottish Water
Status: Not Started Planned Delivery Period: 2023-2025
Description:
Scottish Water will undertake a modelling assessment in the
Hatton sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Outputs of this modelling assessment will be shared with local
authorities and SEPA. 
Funding
Arrangement:
Funding for this action is secured through Scottish Water's
business plan. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 23503)
Objective (ID): Prepare for current flood risk and future flooding as a result
of climate change in Invergowrie (Ref: 2352)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going

Page 4

Description:
Community engagement will continue to be carried out in the
area by SEPA and the responsible authorities to raise
awareness of flood risk. Community engagement activity will
continue in connection with on-going projects and activities.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Estuary and
Montrose Basin Local Plan District Partnership. Information will
be disseminated through website, social media and other
community engagement activity.
Funding
Arrangement:
Community engagement activities will subject to funding from
Perth and Kinross Council’s revenue budget. SEPA's community
engagement activities are funded by the Scottish Government
through SEPA’s grant in aid settlement. Scottish Water is funded
by customer charges as set by their economic regulator; all
business activities required under this action by Scottish Water
are accounted for in their capital or operational expenditure.