Flood Risk Management
(Scotland) Act 2009: 
Local Flood Risk Management Plan
Tay Local Plan District 
Cycle 2: 2022 - 2028 
Published by: Perth & Kinross Council
21 December 2022

Page 2

No embedded text on this page.

Page 3

Delivering sustainable flood risk
management is important for
Scotland’s continued economic
success and well-being. It is
essential that we avoid and
reduce the risk of flooding, and
prepare and protect ourselves
and our communities.
This is second local flood risk management plan for
the Tay Local Plan District, describing the actions
which will make a real difference to managing the
risk of flooding and recovering from any future flood
events. 
The task now for us – local authorities, Scottish
Water, SEPA, the Scottish Government and all other
responsible authorities and public bodies – is to turn
our local flood risk management plan into action.

Page 4

Foreword
The impacts of flooding experienced by individuals, communities and businesses
can be devastating and long lasting. It is vital that we continue to reduce the risk of
any such future events and improve Scotland’s ability to manage and recover from
any events which do occur. 
The publication of this Plan is an important milestone in implementing the Flood Risk
Management (Scotland) Act 2009 and improving how we cope with and manage
floods in the Tay local plan district.  The Plan translates this legislation into actions to
reduce the damage and distress caused by flooding over the second planning cycle
from 2022 to 2028. 
The Tay local plan district is led by Perth & Kinross Council who have published this
Plan on behalf of a partnership comprising Angus Council, Fife Council, Stirling
Council, SEPA, Scottish Water, Scottish Forestry, Forestry and Land Scotland, Loch
Lomond & Trossachs National Park Authority and Cairngorms National Park
Authority. 
In summary, there are 14 areas that have been identified as being potentially
vulnerable to flood risk across the Tay local plan district. It is estimated there are
around 9,000 homes and businesses at risk from flooding, and this may increase to
13,000 homes and businesses by the 2080s due to climate change. The estimated
annual average damage of these flood risks is £11.4 million. 
This Plan presents actions to avoid and reduce the risk of flooding, and prepare and
protect ourselves and our communities within these potentially vulnerable areas and
across the local plan district. These actions include 6 flood protection schemes or
works; 9 flood studies and 5 surface water management plans. The delivery of many
of these actions may be dependent on the availability of funding; however, we can all
play our part in managing flood risk as we are able. 
Individuals are the first line of defence against flooding and have responsibilities to
protect themselves from flooding.  The publication of this Plan shows that the
coordinated and collaborative efforts of public bodies can be brought together to
deliver sustainable outcomes. However, the actions in this Plan can only be
delivered with the support of all the public bodies, the Scottish Government and,
most importantly, you and your communities. 
This Plan therefore provides the blueprint upon which SEPA, local authorities and
Scottish Water and any other responsible authorities will deliver their flood risk
management responsibilities and, in particular, that all steps should be taken to
manage flooding in a sustainable manner.

Page 5

We would like to thank all those who contributed to the development of this Plan
which will help shape the way in which floods and their impacts are managed across
the Tay local plan district. 
Contributors 
Perth and Kinross Council
Angus Council
Fife Council
Stirling Council
SEPA
Scottish Water
Loch Lomond and the Trossachs National Park
Cairngorms National Park Authority
Scottish Forestry
Forestry and Land Scotland

Page 6

Contents 
Foreword .......................................................................................................................... 3
Contributors ...................................................................................................................... 4
Contents ........................................................................................................................... 5
List of Acronyms and Abbreviations .................................................................................. 7
Chapter 1. What is a Local Flood Risk Management Plan? ............................................... 8
1.1 How to Read This Plan ........................................................................................... 9
1.2 Progress in Cycle 1 (2016-2022) ............................................................................. 9
1.3 How have we developed the Local Flood Risk Management Plan? ...................... 10
1.4 Roles and Responsibilities for Flood Risk Management Planning ......................... 10
1.5 Consultation, Engagement and Advice ................................................................. 13
1.6 Identification of Objectives, Appraisal and Prioritisation of Actions ........................ 13
1.7 Strategic Environmental Assessment and Habitats Regulations  Appraisal ........... 14
1.8 Links with other Plans, Policies, Strategies and Legislative  Requirements ........... 15
1.9 Next Steps and Monitoring Progress ..................................................................... 17
1.10 Licensing Acknowledgements ............................................................................... 17
Chapter 2. Managing Flood Risk in the Tay Local Plan District........................................ 18
2.1 Understanding of Flooding Within the Tay Local Plan District ............................... 18
2.2 Background Summary of Flooding in the Tay Local Plan District .......................... 18
2.3 Summary of Objectives and Actions Across the Tay Local Plan District ................ 20
2.4 Potentially Vulnerable Areas (PVAs) ..................................................................... 32
Chapter 3. Potentially Vulnerable Areas (PVAs) .............................................................. 36
3.1 List of Potentially Vulnerable Areas (PVAs)........................................................... 37
3.1 Blair Atholl - PVA 02/08/01 .................................................................................... 38
3.2 Pitlochry - PVA 02/08/02 ....................................................................................... 42
3.3 Aberfeldy and Weem - PVA 02/08/03 ................................................................... 47
3.4 Alyth - PVA 02/08/04 ............................................................................................. 54
3.5 Kirriemuir & Forfar - PVA 02/08/05 ........................................................................ 58
3.6 Blairgowrie & Rattray - PVA 02/08/06 ................................................................... 65
3.7 Coupar Angus - PVA 02/08/07 .............................................................................. 69
3.8 Dunkeld & Birnam - PVA 02/08/08 ........................................................................ 73
3.9 Bankfoot - PVA 02/08/09....................................................................................... 82
3.10 Luncarty - PVA 02/08/010 ..................................................................................... 85
3.11 Scone - PVA 02/08/11 .......................................................................................... 89
3.12 Perth & Almondbank - PVA 02/08/12 .................................................................... 94

Page 7

3.13 Comrie - PVA 02/08/13 ....................................................................................... 106
3.14 Bridge of Earn - PVA 02/08/14 ............................................................................ 112
3.15 Other Flood Risk Activities by Local Authorities in the Tay Local Plan District ..... 117
3.16 Next Steps and Monitoring Progress ................................................................... 118
Annex 1: Tay LPD Roles, Responsibilities & Contact Details ........................................ 119
Annex 2: Consultation and Engagement ....................................................................... 124
Annex 3: Land Use Planning ........................................................................................ 139
Annex 4: Strategic Environmental Assessment & Habitats Regulations Appraisal ........ 142
Annex 5: Links to Other Plans, Policies, Strategies and Legislative Requirements ....... 144
Annex 6: Supporting information................................................................................... 148
Annex 7: Glossary ........................................................................................................ 152
Annex 8: Licencing & Acknowledgements .................................................................... 167

Page 8

List of Acronyms and Abbreviations
AOB  - Area of Benefit
CNPA - Cairngorms National Park Authority
CoSLA - Convention of Scottish Local Authorities
FLS  - Forestry and Land Scotland
ICS  - Integrated Catchment Study
LFRMP  - Local Flood Risk Management Plan
LLTNPA  - Loch Lomond and Trossachs National Park Authority
LPD  - Local Plan District
PVA  - Potentially Vulnerable Area
PVAc  - Candidate Potentially Vulnerable Area
Q&S - Quality & Standards (Scottish Water)
RAs - Responsible Authorities (Local Authorities, Scottish Water, National
Park Authorities and Forestry and Land Scotland)
SEPA  - Scottish Environment Protection Agency
SW  - Scottish Water

Page 9

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 | 8 
Chapter.1 What is a Local Flood Risk Management Plan? 
This Local Flood Risk Management Plan (the ‘Plan’) has been developed to detail
the actions adopted to reduce the devastating and costly impact of flooding in the
Tay Local Plan District. The Plan supplements the Tay Flood Risk Management Plan
for the Tay Local Plan District developed by SEPA in consultation with local
authorities, Scottish Water, the National Park Authorities and transport and utility
companies. The Flood Risk Management Plans were developed to coordinate the
efforts of all organisations that tackle flooding from all sources and in both urban and
rural areas. They set the objectives to tackle flooding and identify actions to deliver
these objectives. Objectives and actions have been set and agreed by all
responsible authorities and programmed over six-year planning cycles.  The Flood
Risk Management Plans set out the short to long term ambition for flood risk
management in Scotland, identifying where the risk of flooding and the benefits of
investment are greatest.  They are also important in our response to the climate
emergency as flooding is increasing due to climate change. 
The Local Flood Risk Management Plan takes the actions contained in the Flood
Risk Management Plan and adds details as to who will be responsible for
implementing actions, a timetable of when actions will be delivered and a description
of the coordination and funding arrangements (for detail see Chapter 3). The Local
Plan covers the second six-year implementation cycle from 2022 to 2028. 
By publishing the Local Flood Risk Management Plan, individuals and local
communities are provided with information that allows them to better manage their
own responsibilities. Everyone can take action with the confidence of what others are
doing and with the clear knowledge of when they are undertaking these actions.  It is
through this risk-based and plan-led approach that flood management will improve
for the individuals, communities and businesses at risk in the Tay Local Plan District. 
The contents of the Local Flood Risk Management Plan have been agreed by the
lead authority, all responsible authorities and SEPA. 
The Plan is published by Perth & Kinross Council as the lead authority for the Tay
Local Plan District. It has been prepared in collaboration with Stirling Council, Angus
Council, Fife Council, SEPA, Scottish Water, Loch Lomond and the Trossachs
National Park Authority, Cairngorms National Park Authority, Scottish Forestry,
Forestry and Land Scotland and other organisations with a responsibility or interest
in managing flooding. The Plan is a statutory requirement of the Flood Risk
Management (Scotland) Act 2009.

Page 10

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 9 
1.1 How to Read This Plan 
This Local Flood Risk Management Plan has been developed in three sections:
• Chapter one explains what the flood risk management plan is, how it has
been developed and the obligations different partners have to fulfil duties
under the Flood Risk Management (Scotland) Act 2009;
• Chapter two provides a summary of flood risk in the Tay Local Plan District
and an overview of the objectives and actions that have been selected to
manage that risk across the district and within the Potentially Vulnerable
Areas;
• Chapter three looks at the detail of the objectives and actions set within each
Potentially Vulnerable Area for the second flood risk management cycle from
2022 – 2028, along with historical flooding information.
The annexes to this Plan provide supporting documents and references, and present
more detailed information in various formats. A glossary of the terms used within this
document is also available.
This Plan should be read alongside the Flood Risk Management Plan for the Tay
Local Plan District. The Flood Risk Management Plan has been developed by SEPA
in parallel with this Plan and provides additional background information and national
context. The Flood Risk Management Plans were approved by Scottish Ministers
and published in December 2021. Both this Local Plan and the Flood Risk
Management Plan will be updated every six years.
1.2 Progress in Cycle 1 (2016-2022) 
The 2016 local flood risk management plan outlined the long-term objectives to
tackle flooding in the areas at highest risk within the Tay Local Plan District.
The objectives for each area were agreed and actions were developed to meet those
objectives. Actions to reduce flood risk included developing flood studies and flood
protection schemes and providing public flood warnings and alerts. Actions to avoid
flooding included maintenance of flood defences and storage areas and producing
strong planning policies, which prevent development from taking place in flood risk
areas. 
In 2019, Perth and Kinross Council published the interim report for the Tay Local
Plan District. This report gave the status of each action at that time and reported
them as red, amber or green:
• Green – Action has been delivered and/or is on programme and within
budget;

Page 11

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 10 
• Amber – Action is behind programme and/or over budget, but the key dates
are still anticipated to be met;
• Red – Action is behind programme and/or over budget, with key dates unlikely
to be met and/or outputs unlikely to achieve what was anticipated by the Local
Flood Risk Management Plan.
Actions with a green or amber status can be expected to succeed in working towards
their objectives. The final report was published December 2022.  The interim and
final reports can be viewed at www.pkc.gov.uk/frmplans. 
1.3 How have we developed the Local Flood Risk Management Plan? 
Many organisations and individuals have been involved in helping to improve flood
risk management in Scotland and to provide a more holistic approach than was
previously undertaken. It is recognised that a piecemeal or reactive approach to
tackling flooding does not work. Working jointly to overcome administrative,
institutional, and geographical boundaries is essential to deliver effective flood risk
management.
The Local Flood Risk Management Plan has been developed in close partnership
between all responsible authorities, SEPA and Scottish Water. In local partnerships,
here and throughout Scotland, SEPA has provided the technical analysis and the
evidence to ensure that a nationally consistent approach is taken. Local authorities,
Scottish Water and the National Park Authorities have made sure that local
knowledge and expertise has informed the decision-making. The Tay Local Plan has
been developed in partnership by:
• Perth & Kinross Council (lead authority)
• Angus Council
• Fife Council 
• Stirling Council
• SEPA
• Scottish Water
• Loch Lomond and the Trossachs National Park Authority
• Cairngorms National Park Authority
• Scottish Forestry
• Forestry and Land Scotland 
1.4 Roles and Responsibilities for Flood Risk Management Planning 
Individuals are the first line of defence against flooding and have responsibilities to
protect themselves from flooding. Being prepared by knowing what to do and who to

Page 12

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 11 
contact if flooding happens can help you reduce the damage and disruption flooding
can have on your life. There are steps you can take now to be flood prepared and
reduce the damage and disruption flooding can have on your life.
• View SEPA’s flood maps to check if your area is affected by flooding
https://map.sepa.org.uk/floodmaps
• Sign up to Floodline to receive messages when flooding is forecast in your
area https://www.floodlinescotland.org.uk/
• Know who to contact if flooding happens
https://www.sepa.org.uk/media/28952/who_to_contact_2014.pdf
The Scottish Government oversees the implementation of the Flood Risk
Management (Scotland) Act 2009, which requires the production of flood risk
management plans and local flood risk management plans. Scottish Ministers are
responsible for setting the policy framework for how organisations collectively
manage flooding in Scotland.
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk
management authority. SEPA has a statutory duty to produce Scotland's Flood Risk
Management Plans. SEPA works closely with other organisations responsible for
managing flood risk through a network of partnerships and stakeholder groups to
ensure that a nationally consistent approach to flood risk management is adopted.
SEPA also has a responsibility to identify where in Scotland there is the potential for
natural flood management techniques to be introduced. 
In running Floodline, SEPA provides direct warnings, live flooding information and
advice on how to prepare for or cope with the impacts of flooding 24 hours a day,
seven days a week. To help forecast for flooding SEPA works in partnership with the
Met Office through the Scottish Flood Forecasting Service. SEPA has piloted surface
water flood forecasting to help urban areas improve their resilience to, and
preparedness for, flooding. The development and wider roll-out of this service is
being considered alongside the technical, resource and communication challenges
associated with providing surface water flooding guidance.
To raise awareness of flooding at a national level SEPA runs education initiatives,
community engagement programmes and an annual campaign to promote the useful
advice and information available through Floodline. SEPA works in partnership with
local authorities, Neighbourhood Watch Scotland, Ready Scotland and others to
share our resources and help to promote preparedness and understanding of how
flood risk is managed.
Local authorities work together for flood risk management planning purposes
through a single lead authority which has the responsibility to produce a Local Flood
Risk Management Plan. Local authorities have been working collaboratively to
develop these. It is the responsibility of your local authority to implement its flood
protection actions agreed within the Plan whether that is new engineering projects,

Page 13

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 12 
raising awareness of flooding or clearance and repair activities on the watercourses
the Council manages. During severe flooding, local authorities will work with the
emergency services and coordinate shelter for people evacuated from their homes.
Scottish Water is a responsible authority for flood risk management and is working
closely with SEPA, local authorities and others to coordinate plans to manage flood
risk. Scottish Water has the public drainage duty and is responsible for foul drainage
and the drainage of rainwater run-off from roofs and any paved ground surface from
the boundary of properties. Additionally, Scottish Water helps to protect homes from
flooding caused by sewers either overflowing or becoming blocked. Scottish Water is
not responsible for private pipework or guttering within the property boundary
Loch Lomond and the Trossachs National Park Authority (LLTNPA) is a
responsible authority for flood risk management, is a land manager and is the
planning authority for the area of the Tay catchment within the National Park
boundary. Local Authorities and the LLTNPA will work closely to ensure any actions
that may affect the park are approved and undertaken in such a way that is sensitive
to the conservation areas and in keeping with the National Parks environmental
policies.
Cairngorms National Park Authority (CNPA) is a responsible authority for flood
risk management, is a land manager and is the planning authority for the area of the
Tay catchment within the National Park boundary. Local Authorities and the CNPA
will work closely to ensure any actions that may affect the park are approved and
undertaken in such a way that is sensitive to the conservation areas and in keeping
with the National Parks environmental policies.
Scottish Forestry and Forestry and Land Scotland took over the roles of Forestry
Commission Scotland in 2018 when the Forestry and Land Management (Scotland)
Act 2018 came into force. While these executive agencies of Scottish Government
are not formally designated as a responsible authority under the Flood Risk
Management (Scotland) Act 2009, they support Scottish Government in delivering its
flood risk related duties. This includes engaging in the development of the flood risk
management plans through national and local advisory groups, Local Plan District
partnerships, and collaborative projects. This reflects the widely held view that
forestry can play a significant role in managing flooding.
The Met Office provides a wide range of forecasts and weather warnings. SEPA
and the Met Office work together through the Scottish Flood Forecasting Service,
combining SEPA’s hydrological expertise with the Met Office’s meteorological data to
predict the likelihood and timing of river, coastal and surface water flooding.
The emergency services provide emergency relief when flooding occurs and can
coordinate evacuations. You should call the emergency services on 999 if you are
concerned about your safety or the safety of others and act immediately on any
advice provided.

Page 14

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 13 
The Scottish Flood Forum aims to reduce the impacts of flooding by providing
immediate support and by establishing a network of community resilience groups in
flood risk areas, to equip communities to cope with flooding.
Further details on some of these key roles are outlined in Annex 1. 
1.5 Consultation, Engagement and Advice 
Local authorities and SEPA were keen to hear from the people and communities that
live under the threat of flooding, to ensure that our technical analysis of the risks is
accurate and that efforts to manage flooding are targeted to where most can be
achieved. Two statutory public consultations were held during the development of
the Flood Risk Management Strategies and Plans. The first consultation, held in
2018 and led by SEPA, was on the general approach to flood risk management
planning and the identification of priority areas. The second, held in 2021, was a joint
SEPA and lead authority consultation on the draft Flood Risk Management
Strategies and implementation plans. The views and representations of the
respondents to this second consultation were taken into account in developing and
finalising this Local Flood Risk Management Plan. 
In addition to input from the public consultations, advice has been sought from
relevant organisations at key stages. Some of the work carried out has been
complex and technical in nature for which professional advice was sought. Working
together, SEPA, the Scottish Government, local authorities, Scottish Water, Scottish
Forestry, Forestry and Land Scotland, the National Park Authorities and other key
interested organisations have assisted each other and developed industry best
practice guidance for flood risk management planning. 
Further detail on consultation and engagement can be found within Annex 2. 
1.6 Identification of Objectives, Appraisal and Prioritisation of Actions 
The identification of objectives and selection of actions was led by SEPA as part of
the Flood Risk Management Plan with input from local authorities and Scottish
Water. 
Working collaboratively with local partnerships, SEPA has agreed the objectives for
addressing the main flooding impacts. Actions that could deliver these agreed
objectives have been selected to ensure the right combinations are identified and
prioritised. The actions considered in the development of the Flood Risk
Management Plan include structural actions (such as building floodwalls, restoring
flood plains, or clearance and repair works to rivers) and non-structural actions (such

Page 15

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 14 
as flood warning, land use planning or improving our emergency response).
Structural and non-structural actions are used together to manage flood risk
effectively. 
Natural flood management can provide opportunities for using the land to slow down
and store water. Natural flood management actions will be considered further as part
of any individual flood studies.   
The lists of actions to meet agreed goals and objectives in the second six-year cycle
considered what would be achievable assuming a similar level of funding for flood
risk management activities from the Scottish Government. However, given the timing
of spending reviews and annualised financial settlements for local government, the
actual ability to deliver all the actions set out in the Flood Risk Management Plans in
December 2021 and detailed in this Plan will be dependent on the availability of the
necessary funding in each year of the six-year Plan.
The distribution of Scottish Government grant funding for actions in the plan for the
period 2022 – 2028 is currently being considered by a flood risk management
working group. This group will put forward options and recommendations to the
Scottish Ministers and COSLA, through the Settlement and Distribution Group, for
consideration. A decision will not be made in time for the publication of this Plan. As
such it should be noted that it may not be possible for all actions identified in the
Plan to be grant funded. Inclusion of an action in this plan does not formally commit
a Council to implement it, if reasons arise which make any actions undeliverable,
including inability to secure adequate funding. 
This Plan remains the best understanding of the objectives and actions required over
the long term to manage flood risk in the identified high risk areas within this LPD.
The delivery of the Plan, particularly the ambitions on how quickly actions can be
delivered, may have to be adapted to reflect wider developments in public funding,
the ability of responsible authorities to access funding from other sources, pandemic
recovery, and other national priorities. 
1.7 Strategic Environmental Assessment and Habitats Regulations 
Appraisal 
A Strategic Environmental Assessment (SEA) and Habitats Regulations appraisal
have been undertaken for the Flood Risk Management Plan document that has
informed this Plan. As this Local Flood Risk Management Plan is considered to be
consistent with the Flood Risk Management Plan, no further SEA assessment has
been undertaken. In order to confirm this was appropriate, Perth and Kinross Council
submitted a SEA screening report to the SEA Gateway. The screening responses
received via the SEA Gateway confirmed that he above approach was acceptable.
Further impact assessments will be undertaken on any specific projects as required.

Page 16

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 15 
As the lead authority for the Tay District and a competent authority, Perth and
Kinross Council also undertook a Habitats Regulations Appraisal to ensure that the
Tay Local Flood Risk Management Plan will not adversely affect the integrity of
Special Areas of Conservation and Special Protection Areas. NatureScot were
consulted on the appraisal and their views have been taken into account. Mitigation
has been applied where required to ensure that this Local Flood Risk Management
Plan will not adversely affect the integrity of Special Areas of Conservation and
Special Protection Areas.
Further details are available in Annex 4. 
1.8 Links with other Plans, Policies, Strategies and Legislative 
Requirements 
This Plan does not stand in isolation. As far as is practicable, an integrated approach
to land and water management has been pursued. When developing the Flood Risk
Management Plan and the Local Flood Risk Management Plan, early links were
made with other relevant aspects of water and land management including local
development plans, river basin management plans and emergency plans. In turn, the
responsible authorities will work proactively to ensure the findings from these flood
risk management plans and strategies will influence other planning initiatives in an
interactive and iterative cycle. Making these links has helped identify opportunities to
deliver multiple benefits from flood risk management goals, objectives and actions.
River basin management planning 
Reducing flood risk in Scotland through the development of Flood Risk Management
Plans has provided an opportunity to connect with plans to improve the quality of
Scotland’s water environment. For example, coordination between river basin
management and flood risk management can reduce flood risk, whilst improving
water quality and biodiversity. 
SEPA is coordinating the delivery of River Basin Management Plans and Flood Risk
Management Plans, and local authorities for Local Flood Risk Management Plans,
and they have worked to ensure that there is integration and coordination between
them. This coordination, particularly in regard to consultation and engagement but
also in delivering environmental improvements, will be important for stakeholders
many of whom have an interest in both sets of plans 
Land Use and Spatial Planning 
Land use planning decisions are pivotal to achieving sustainable flood risk
management. Flood risk management can have significant implications for the
location of development and similarly the location of development can have an

Page 17

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 16 
impact on flood risk. Actions that deliver national land use planning policies are
summarised in Annex 3. 
Perth and Kinross Council develops and adopts a new Local Development Plan
every five years.  It sets out the Council’s strategy for delivering appropriate
development in Perth and Kinross, considering a number of potential constraints,
including flooding. The current plan (LDP2) was adopted in November 2019. Work
has started on the review of LDP2 in order to produce LDP3. The initial work on the
LDP3 review has been centred on data gathering and settlement audit work. Key
milestones in the LDP3 review will be the policy and place discussions which will
take place during 2023/24, culminating in the preparation of an Evidence Report in
2024, whilst preparation of the Proposed Plan is programmed for 2024/25. 
Emergency Planning and Response
Emergency planning and response is undertaken by Category 1 and 2 responders
including Police Scotland, the Scottish Fire and Rescue Service, the Scottish
Ambulance Service, both local authorities, the NHS, the Met Office and SEPA.
Emergency plans are prepared under the Civil Contingencies Act 2004. 
Perth and Kinross Council has produced its Flooding Emergency Response Plan,
which is designed to ensure that contingency measures are in place for a
coordinated and flexible response to flooding incidents to mitigate the effects of
flooding emergencies on people, property and infrastructure. Other local authorities
have similar arrangements in place.
Scottish Water Investment Plans 
There is a close relationship between flood risk management plans and Scottish
Water’s 25-year strategic plan. Sewer flooding is not considered in detail in the flood
risk management plans as it remains a high priority for Scottish Water and its
customers. Scottish Water’s close involvement in flood risk management planning
aims to ensure that there is strong coordination between the management of sewer
flooding and wider surface water flood risk, and the actions to be taken forward by
local authorities and others.
Surface Water Management Plans 
Surface water flooding occurs when rainwater does not drain away via normal
drainage systems or soak into the ground but lies on of flows over the ground
instead. This form of flooding is experienced in areas of the Tay Local Plan District.
This will be addressed by Surface Water Management Planning, which is a key
component of the flood risk assessment that has led to the development of this Plan.
Further details of this work can be found in Annex 5.

Page 18

Tay Local Flood Risk Management Plan 
Return to Contents Page  Chapter 1 – The Local Plan | 17 
1.9 Next Steps and Monitoring Progress 
This Plan runs from December 2022 until June 2028. Over this period the Tay LPD
Partnership will continue to liaise periodically to monitor progress towards
implementing the actions detailed in Chapter 3 of the Plan. 
Between June 2024 and 2025, Perth & Kinross Council, as lead authority will publish
an interim report on the progress towards implementing the actions identified in the
local flood risk management plan.  This mid-term report will be made publicly
available.  
Between June 2027 and 2028, Perth & Kinross Council, as lead authority will publish
a final report on the progress towards implementing the actions contained in the local
flood risk management plan. This final report will also be made publicly available.
A third set of Flood Risk Management Plans and Local Flood Risk Management
Plans will be published in December 2027 and June 2028 respectively.   
1.10 Licensing Acknowledgements 
Full licensing acknowledgements can be found in Annex 8 of this Plan.

Page 19

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 18 
Return to Contents Page
2. Managing Flood Risk in the Tay Local Plan District 
2.1 Understanding of Flooding Within the Tay Local Plan District 
This chapter presents a background summary of flooding in the Tay Local Plan
District. This summary includes the characteristics and impacts of flooding from river,
coastal and surface water sources in the Tay Local Plan District. A summary of the
objectives and planned actions to manage flooding from these mechanisms across
the whole local plan district and within each of the 14 Potentially Vulnerable Areas
(PVAs) is also provided. 
2.2 Background Summary of Flooding in the Tay Local Plan District 
The Tay Local Plan District covers around 6,100km2 and has a population of
approximately 160,000. It spans from the southern part of the Cairngorms National
Park all the way to the Firth of Tay. The Local Plan District includes a 74km stretch
of the inner Firth of Tay coastline, where the River Tay and the River Earn meet. It
includes the urban areas of Aberfeldy, Alyth Blairgowrie, Comrie, Dunkeld, Forfar,
Perth and Pitlochry.
There are urban and agricultural areas to the east and more rural, mountainous and
forested areas to the west. There are many large lochs and reservoirs, including
Loch Ericht, Loch Rannoch and Loch Tay. The main rivers are the Earn and Tay and
the catchements are shown in Figure 1 below. The River Tay is Scotland’s longest
river at 190km, and its main tributaries include the River Garry, River Tummel, River
Lyon, River Braan, River Isla and River Almond. Many of the lochs and rivers in the
Tay catchment are managed to produce hydropower.
The Tay Local Plan District includes a 74km stretch of the inner Firth of Tay, where
the River Tay and the River Earn meet the Firth of Tay.
There is a river, surface water and coastal flood risk. A number of large floods have
affected this Local Plan District. Recently, intense rainfall in August 2020 and in
September 2022 caused extensive surface water flooding in Perth and many other
towns. Further extensive surface water floods were recorded in July 2015 following
intense rainfall. Storms Desmond and Frank in December 2015 caused river
flooding, affecting many areas within the Local Plan District. Extensive flooding in the
early 1990s, notably in 1993, resulted in the construction of the Perth Flood
Protection Scheme. Other formal flood protection schemes have been constructed
within the Local Plan District including in Almondbank, Bridge of Earn, Comrie,
Kirriemuir, and Weem.

Page 20

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 19 
Return to Contents Page 
Figure 1: River catchments within the Tay LPD
(Reproduced from the Tay Flood Risk Management Strategy, SEPA, December 2015) 
Flood maps are required by the Flood Risk Management (Scotland) Act to show
information that describes the nature of a flood in terms of the source, extent, water
level or depth and, where appropriate, velocity of water. River, coastal and surface
water flood maps were developed by SEPA using a consistent methodology to
produce outputs for the whole of Scotland. This was supplemented with more
detailed, local assessments where available and suitable for use. 
In developing the flood maps SEPA have: 
• Used the most up to date modelling techniques; 
• Used industry endorsed methods; 
• Been able to show more information than ever before on the sources and
impacts of flooding; 
• Developed the first national natural flood management maps showing the areas
where natural techniques to help reduce flood risk could be most effective. 
In developing the maps SEPA worked in partnership with local authorities. They also
worked with the industry to define the overall approach to flood hazard mapping and
undertook a series of internal checks and local authority reviews of outputs.  Further
information on Flood Hazard and Risk including mapping can be found at:

Page 21

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 20 
Return to Contents Page
http://www.sepa.org.uk/environment/water/flooding/flood-maps/
Flood hazard and risk maps are referred to collectively as flood maps and are
available on the SEPA website here:
http://www.sepa.org.uk/environment/water/flooding/flood-maps/
Currently it is estimated that there are around 13,000 people and 9,000 homes and
businesses at risk from flooding in the Tay Local Plan District. This may increase to
21,000 people and 13,000 homes and businesses by 2080s due to climate change.
The expected annual cost of flooding over a long period of time is around £11.4
million.
SEPA lead development of the flood risk management plans for Scotland and
delivery of flood warning services. Local flood risk management planning in the Tay
Local Plan District is led by Perth and Kinross Council, as the lead local authority.
Other responsible authorities include three more local authorities, Scottish Water,
Loch Lomond and the Trossachs National Park Authority and Cairngorm National
Park Authority. They are supported by Scottish Government agencies including
Forestry and Land Scotland, Scottish Forestry and Transport Scotland.
Within this Local Plan District, actions are regularly carried out by SEPA and
responsible authorities to help prepare communities for potential flooding and reduce
the impact of any flooding that does occur. 
2.3 Summary of Objectives and Actions Across the Tay Local Plan District 
The identified objectives are the shared aims for managing flood risk and have been
set out in the Tay flood risk management plan which can be viewed in the Tay Flood
Risk Management Plan. The associated actions describe where and how that flood
risk will be managed. The objectives and actions have been developed by SEPA in
consultation with responsible authorities to manage flooding within the Tay Local
Plan District.
Some flood risk management actions apply to all areas and locations (whether
designated as a Potentially Vulnerable Area or not). For example, flood risk can be
managed through national planning policy or as part of ongoing statutory duties for
local authorities.
The general actions that apply across the Tay Local Plan District are set out in the
tables below. These actions are consistent with the Flood Risk Management Plan.
The tables provide further information about who will be responsible for the delivery
and implementation of the actions, a timetable of when the actions will be
undertaken and the coordination and funding arrangements for those actions.

Page 22

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 21 
Return to Contents Page 
Action:  AWARENESS RAISING
Delivery lead: SEPA and responsible authorities
Status:  Existing Planned Delivery Period: On-going
Description:
SEPA, the responsible authorities and other organisations such
as the Scottish Flood Forum work together through national and
local initiatives to help communities understand the risk of
flooding and what actions individuals can take. Improved
awareness of flood risk and actions that prepare individuals,
homes and businesses for flooding can reduce the overall
impact of flooding. 
Local authorities undertake additional awareness raising
activities when developing any specific project proposals and will
engage with community resilience groups and local
communities. 
The Scottish Flood Forum supports flood risk communities by
raising community awareness, promoting self-help, developing
community groups and establish a recovery support programme
after a flood.
Coordination
Arrangement:
Delivery of actions to raise awareness will be coordinated by
SEPA and the responsible authorities through the Local Plan
District Partnership. SEPA and the Responsible Authorities will
use any studies, projects and flood schemes to engage with
communities and raise awareness of flood risk. Communications
activity will be coordinated through existing arrangements within
Local Plan District Partnerships. Information will be disseminated
through website, social media and other community engagement
activity. SEPA and responsible authorities will coordinate
awareness raising activities with other related actions.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Awareness raising activities will be funded from local authority
revenue budgets.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure.
The National Park Authorities also have a duty to raise
awareness of flood risk but do not receive any Scottish
Government funding to support any flood specific activities. 
Action (ID):  DATA TO SUPPORT CLIMATE RESILIENCE
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going

Page 23

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 22 
Return to Contents Page
Description:
As Scotland’s hydrometric authority, SEPA operates a network
of stations to measure river level, flow, rainfall, sea level, loch
and groundwater level. The data goes into a long term data
archive and is critical to underpin all flood risk management
activities including flood warning, flood mapping, design of flood
protection and sustainable development as well as supporting a
range of regulatory and recreational uses. 
SEPA will continue to maintain and develop its hydrometric
network, contribute to UK and international data archives, and
improve and update the datasets used for flood frequency
analysis. 
SEPA will support research and development of data, methods
and guidance to improve the evidence on which decisions can
be made, and to enable the impact of climate change to be
included in all flood risk management activities.yy
Coordination
Arrangement:
SEPA will coordinate with a range of other parties as required to
deliver better and more accessible data, and ongoing
improvements to the use of the data to underpin flood risk
management activities and decisions.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  EMERGENCY PLANS / RESPONSE
Delivery lead: Category 1 and 2 Responders 
Status:  Existing Planned Delivery Period: On-going
Description:
Many organisations, including local authorities, the emergency
services and SEPA provide an emergency response to flooding.
Emergency plans are prepared and maintained under the Civil
Contingencies Act 2004 by Category 1 and 2 Responders and
are coordinated through regional and local resilience
partnerships, often supported by voluntary organisations. They
set out the steps to be taken to maximise safety and minimise
impacts during flooding. Emergency plans may also be prepared
by individuals, businesses, organisations or communities.
Scottish Water is a Category 2 responder under the Civil
Contingencies Act 2004 and will support regional and local
resilience partnerships as required.
Coordination
Arrangement:
Perth and Kinross Council has developed a Generic Emergency
Plan and a Flooding Emergency Response Plan. The Plan is
designed to ensure that contingency measures are in place for
the coordinated and flexible response to flooding incidents to
mitigate the effects of flooding emergencies.
SEPA flood alerts and warnings will be monitored and resources
made ready as required. A coordinated response will follow any
reports of flooding.
Emergency response is coordinated with regional and local
resilience partnerships. This response may be supported by the

Page 24

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 23 
Return to Contents Page
work of voluntary organisations. A debrief and plan review will be
carried out following any flood events.
Protecting property from flooding is the responsibility of the
owner of the property, but local authorities can sometimes
provide sandbags to properties. Unfortunately Councils only
have the resources to supply sandbags to residents where there
is an imminent risk of flooding.
Emergency plans/response activities will be coordinated with
other related actions.
Funding
Arrangement:
Funding is allocated to category 1 and 2 responders by the
Scottish Government for dealing with emergency response and
in extreme cases may reimburse responders after an extreme
event. Scottish Water is funded by customer charges as set by
their economic regulator. All business activities required under
this action by Scottish Water are accounted for in their capital or
operational expenditure. SEPA’s role in this action is funded by
Scottish Government through SEPA’s grant in aid settlement. 
Action (ID):  FLOOD FORECASTING 
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going
Description:
The Scottish Flood Forecasting Service is a partnership between
SEPA and the Met Office. The service continues to produce a
daily, national flood guidance statement, issued to emergency
responders, local authorities, and other organisations with flood
risk management duties. As the flood warning authority for
Scotland SEPA continues to provide its flood warning service
issuing flood alerts and warnings when required, giving people a
better chance of reducing the impact of flooding on their home or
business.
Coordination
Arrangement:
SEPA work in partnership with the Met Office and will work
closely with all other authorities involved in emergency response
to flooding.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  FLOOD WARNING DEVELOPMENT FRAMEWORK
Delivery lead: SEPA
Status:  New Planned Delivery Period: On-going
Description:
SEPA will publish a new flood warning development framework
by March 2022, which will detail its ambitions and strategic
actions to maintain and improve our flood warning service across
Scotland. SEPA will continue to develop the Scottish Flood
Forecast, a 3 day forecast of flood risk across Scotland and
bring together all live information such as flood warnings, river
levels and rainfall data into a central hub easily accessible for
the public. Working in close partnership with the Met Office

Page 25

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 24 
Return to Contents Page
through the Scottish Flood Forecasting Service, SEPA will
develop its capability in surface water flooding forecasting,
focusing initially on the transport sector to support climate-ready
infrastructure. SEPA will also undertake a prioritised
improvement programme of existing river and coastal flood
warning schemes to provide more accurate forecast with
improved lead time.
Coordination
Arrangement:
SEPA work in partnership with the Met Office. Appropriate
engagement with the other authorities involved in emergency
response will happen as the flood warning developments are
progressed.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  FUTURE FLOOD RISK MANAGEMENT PLANNING
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period:
On-going;
Flooding services
strategy 2023; 
Next flood risk
management plans
2027
Description:
The years covered by the lifetime of this plan are crucial. Radical
progress is needed in how we reduce our impact on the climate
and respond to the effects of climate change. How we plan to
manage flooding to our communities is on the front line of the
challenges of this decade. The 2027 flood risk management
plans will be more ambitious than ever before. The plans will
look to develop long term plans for more flood resilient
communities prepared for the impacts of climate change. 
The priority areas which will be the focus points of the next flood
risk management plans will be identified in 2024 with the
designation of PVAs. A 3-month public consultation will be held
to inform the PVA designation. 
We will plan for a better future by publishing our flooding
services strategy in 2023 with a clear and measurable delivery
plan. We will put greener, fairer communities at the heart of our
ambitions. 
SEPA has set its own target to be a regenerative organisation by
2030 and the next set of plans will further this ambition.  
During this plan cycle, SEPA will work to develop new
partnerships with a wider range of stakeholders, including
businesses and commercial sectors. We will investigate
alternative sources of finance to tackle flooding and drive
forward practical options for adaptation. 
Coordination
Arrangement:
SEPA will lead the work, in partnership with the Scottish
Government and other responsible authorities. A wider range of
partners and stakeholders will be developed to support the

Page 26

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 25 
Return to Contents Page
action. SEPA will carry out a full consultation on the next draft
flood risk management plans in 2026.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  GUIDANCE DEVELOPMENT
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period:
Draft flood studies
guidance (SEPA)
2023; 
Options appraisal &
Adaptation guidance
(Scottish Govt &
SEPA) 2023; 
Other guidance &
updates 2023-2028
Description:
The Scottish Government and SEPA will develop and update
guidance to inform flood risk management projects. This
guidance will be produced in 2022 and will look at how best to
adapt to the long-term impacts of climate change and the most
appropriate methods of assessing the benefits of flood risk
management actions. 
Technical guidance to support flood risk management partners
will be reviewed and updated by SEPA where required. 
Scottish Forestry, in collaboration with its UK counterparts, will
produce guidance on designing and managing forests to reduce
flood risk. 
Guidance will be developed to help local authorities understand
the requirements for mapping relevant bodies of water and
sustainable urban drainage systems in their areas.
Coordination
Arrangement:
The Scottish Government, SEPA and Scottish Forestry all have
lead roles in delivering the new or updated guidance outlined. A
range of forums will be used to help coordinate and develop the
guidance with the appropriate input from others, including SAIFF
(The Scottish Advisory Implementation Forum for Flooding) and
cross-party working groups.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  HAZARD MAPPING UPDATES
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going
Description:
An understanding of flooding is essential to develop a plan led
risk-based approach to flood risk management. SEPA will
continue to update their national hazard mapping, which shows
the likelihood of flooding in Scotland from different flooding

Page 27

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 26 
Return to Contents Page
sources:
https://www.sepa.org.uk/environment/water/flooding/flood-maps/.
SEPA will continue to develop the hazard mapping viewer to
make it easier for the public, partners and stakeholders to
access data on the likelihood of flooding. SEPA will also review
how modelling and mapping updates are undertaken to develop
a more effective method of regional and national updates for the
hazard maps.
Coordination
Arrangement:
SEPA will work with other relevant parties - including authorities
who have ownership of  data used in flood mapping - to develop
the quality and accessibility of flood hazard mapping.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  LAND USE PLANNING
Delivery lead: Planning authority
Status:  Existing Planned Delivery Period: On-going
Description:
Local authorities, SEPA and Scottish Water all have a
responsibility under the Flood Risk Management (Scotland) Act
2009 to support sustainable flood risk management through the
land use planning process. National planning policies set out the
Scottish Ministers’ priorities for the development and use of land.
Under this approach, new development in areas with medium to
high likelihood of flooding should generally be avoided. Current
national planning policies aim to restrict development within the
floodplain and limit exposure of new receptors to flood risk,
promote flood reduction via natural and structural flood
management measures and restoration of natural features, and
avoid increased surface water flooding through sustainable
drainage and the minimisation of impermeable surfaces. Locally
determined planning policies may place further requirements
within their area of operation to restrict inappropriate
development and prevent unacceptable risk.
Coordination
Arrangement:
Planning authorities coordinate their work with the strategic
development planning authority and the National Parks
Authorities, who are also planning authorities.
SEPA, Scottish Water and local authority flooding teams are
consulted on planning applications and coordinate with the
Planning authorities to ensure that flood risk is addressed. Local
Development Plans provides the framework against which
planning applications outside the National Parks are assessed
and are consistent with the Strategic Development Plans.
SEPA deliver statutory advice on flooding on both planning
applications and Local Development Plans and will continue to
work with the other responsible authorities to support the land
use planning process.
Perth and Kinross Council’s Flooding Team are consulted on
planning applications and work with the Planning and

Page 28

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 27 
Return to Contents Page
Development Service to ensure that flood risk is addressed. The
Perth & Kinross Local Development Plan (LDP2) provides the
framework against which planning applications outside the
National Parks are assessed and is consistent with the Strategic
Development Plan (TAYplan). Supplementary Guidance on
Flood Risk and Flood Risk Assessments is also available to
support the content of the Perth & Kinross Local Development
Plan. 
Planning applications within the National Parks are assessed
against their respective Local Development Plans, which also
contain policies in relation to flood risk. 
Planning applications are also reviewed against SEPA’s
indicative flood maps, existing flood studies and records of
flooding. Where flood risk is an issue, developers are required to
prepare and submit a site-specific flood risk assessment and
drainage impact assessment as applicable. They must also
consider how a development site will be drained and how
surface water runoff will be managed through the implementation
of appropriate Sustainable Urban Drainage Measures. So as to
align the flood risk management and land use planning systems,
land use planning objectives and actions have been developed
which can be viewed in Annex 3.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. Local authority planning
activities are subject to funding from Council revenue budgets.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. Planning activities are funded from the
National Park’s revenue budget which is a combination of
Scottish Government direct grant and planning fees. 
Action (ID):  MAINTENANCE
Delivery lead: Local authority, Scottish Water, asset / land managers
Status:  Existing Planned Delivery Period: On-going
Description:
Local authorities have a duty to assess bodies of water and to
carry out clearance and repair works where such works would
substantially reduce flood risk. Local authorities are also
responsible for the drainage of roads. In addition, local
authorities may also be responsible for maintenance of any
existing flood protection schemes or works. 
Scottish Water will continue to undertake risk-based inspection,
maintenance and repair on the public sewer network. 
Asset owners and riparian landowners are responsible for the
maintenance and management of their own assets including
those which help to reduce flood risk.
Coordination
Arrangement:
Local authorities prepare maps of relevant bodies of water and
sustainable urban drainage systems (SUDS) and carry out

Page 29

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 28 
Return to Contents Page
routine, scheduled inspections of bodies of water on their lists at
a frequency which depends on flood risk. Local authorities
assess flood risk on bodies of water from time to time and
prepare a schedule of clearance and repair works where such
works would substantially reduce flood risk. The schedule is
available for public inspection and local authorities have a duty
to carry out any clearance and repair works described therein. 
Further reactive inspections are carried out when issues are
highlighted or during times of flooding. Further bodies of water
will be included where it has been identified that they may give
rise to a risk of flooding. 
Any identified clearance and repair works from these inspections
are logged in a database and are undertaken in order of priority,
subject to available funding. 
Asset owners and riparian landowners are responsible for the
maintenance and management of their own assets including
those which help to reduce flood risk. In the first instance,
clearance and repair works are therefore referred to the
landowner, where they can be identified. Local authorities
usually only carry out works where there has been a failure of
the landowner to act, where landownership is not clear, or where
urgent intervention is required.
Local authorities will liaise with SEPA where controlled activities
may be required and with private landowners where they may
require to take access on private land or to notify landowners
that they require to undertake maintenance.
Funding
Arrangement:
Maintenance activities are subject to funding from the relevant
local authority revenue budget. 
Scottish Water is funded by customer charges as set by their
economic regulator. All business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID):  NATURAL FLOOD MANAGEMENT MAPPING
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: 2025
Description:
SEPA will continue to support activities that improve our
understanding of how to effectively target and deliver natural
flood management. As part of this, SEPA will review and update
the opportunities mapping for natural flood management. This
will include linking blue-green infrastructure with the surrounding
natural catchment and coastline. Natural flood management
seeks to store or slow down flood waters through measures such
as the planting of woodlands, wetland creation, river restoration,
or the creation of intertidal habitats. In addition to flooding
benefits, natural flood management measures can also provide
many additional benefits to biodiversity, water quality, recreation,
and carbon storage.

Page 30

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 29 
Return to Contents Page
Coordination
Arrangement:
SEPA will work with key stakeholders to review and update the
opportunities mapping.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  NATIONAL FLOOD RISK ASSESSMENT
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: On-going
Description:
SEPA will use the most suitable data to review and update the
national flood risk assessment (NFRA) undertaken in 2018. This
update will be used to identify future potentially vulnerable areas
and focus flood risk management planning. 
Coordination
Arrangement:
SEPA will work with others as the NFRA is updated, including to
keep other responsible authorities informed through the Local
Plan District Partnerships.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  NATIONAL SURFACE WATER MAPPING
Delivery lead: SEPA
Status:  Existing Planned Delivery Period: 2024
Description:
The national flood risk assessment 2018 identified that surface
water flooding has the potential to impact more properties in
Scotland than any other source of flooding. Over the next 6 year
cycle SEPA will look to vastly improve its national understanding
of surface flood risk by undertaking a wholescale update of the
national surface water maps to reflect developments in data and
understanding, including the impact of climate change.
Coordination
Arrangement:
SEPA is currently working with a contractor to develop the
modelling needed to deliver the flood maps. As the mapping is
developed, local authorities and Scottish Water will continue to
be engaged in opportunities to verify, shape and understand the
new mapping products.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  RESERVOIRS
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period:
On-going; 
(Flood warning
developments
2022-2024)
Description:
SEPA will continue to develop its assessment of flood risk from
dam failure and use these assessments to direct a proportionate
regulatory approach to ensure reservoir safety.  Over the next
management cycle we will implement further developments of

Page 31

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 30 
Return to Contents Page
our flood warning capabilities in the unlikely event of reservoir
failure.
Coordination
Arrangement:
SEPA will work with others as required, to deliver the regulatory
duties and to develop flood warning capabilities. Others will
include reservoir managers and operators, and Civil
Contingencies Act responders who share duties for emergency
response.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  SCOTTISH FLOOD DEFENCE ASSET DATABASE
Delivery lead: SEPA
Status:  Existing Planned Delivery
Period: On-going
Description:
The Scottish Flood Defence Asset Database provides
information on existing flood protection schemes. National data
on flood protection infrastructure is needed to understand flood
risk and to develop adaptation planning for Scotland. SEPA will
continue to host SFDAD and look for opportunities to support
the development of our understanding of how and when
Scotland’s flood defence assets should be adapted to continue
to maintain protection from flooding in the future.
Coordination
Arrangement:
SEPA will work with the local authorities to ensure accurate data
on existing and new schemes is made available for the Scottish
Flood Defence Asset Database.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID):  SELF HELP (80410011)
Delivery lead: -
Status:  Existing Planned Delivery
Period: On-going
Description:
Everyone is responsible for protecting themselves and their
property from flooding. People can take steps to reduce damage
and disruption to their homes and businesses should flooding
happen. This includes preparing a flood plan and flood kit,
installing property flood resilience measures, signing up to
Floodline, engaging with their local flood group, and ensuring
that properties and businesses are insured against flood
damage. The following places offer help with taking steps to
protect yourself: 
https://www.floodre.co.uk/ 
https://www.biba.org.uk/current-issues/flood-insurance/
https://floodlinescotland.org.uk/ 
https://scottishfloodforum.org/
Responsible authorities and SEPA will continue to develop the
understanding of flood risk to communities and promote

Page 32

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 31 
Return to Contents Page
measures to help individuals and businesses to reduce their
risk.
Coordination
Arrangement:
SEPA and Responsible Authorities have a duty to raise public
awareness of flood risk. Helping individuals understand the risks
from which they are most vulnerable from is the first step in the
process.
SEPA and Responsible Authorities will continue to actively
promote Floodline; provide communities with advice to help
them prepare for flooding and to install property flood products;
and will support community resilience groups to developing their
emergency plans.
Work by SEPA and the responsible authorities to develop
understanding and help communities reduce their risk will be
coordinated through the Local Plan District Partnership.
Funding
Arrangement:
Individuals have prime responsibility for protecting themselves
and their property from flooding and are therefore expected to
meet the costs of protecting themselves.

Page 33

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 32 
Return to Contents Page
2.4 Potentially Vulnerable Areas (PVAs) 
Potentially Vulnerable Areas (PVAs) were designated in 2018 based on the potential
current or future risk from all sources of flooding. This designation was informed by
the second national flood risk assessment, which can be viewed at:
https://www.sepa.org.uk/data-visualisation/nfra2018/)
As part of continued analysis of flood risk, the national flood risk assessment and
Potentially Vulnerable Areas (PVAs) will be reviewed every 6 years to take on board
any new information. Following the second national flood risk assessment, a small
number of Potentially Vulnerable Areas were identified as having a lower flood risk
than first thought. In light of this new information, those PVAs only have general
objectives and actions and no specific objectives or actions have been set. 
There are now 14 Potentially Vulnerable Areas (PVAs) in this Local Plan District, as
shown in Figure 2 below.
The main focus of this Local Flood Risk Management Plan is to manage flood risk in
these Potentially Vulnerable Areas where specific objectives and actions apply, in
addition to the general actions listed in 2.3 above. These specific actions are
required to manage a particular source of potential flooding. Table 3 therefore
provides a summary of where specific actions will be undertaken during the second
flood risk management planning cycle (2022-2028). Further detail on the specific
objectives and actions relating to each individual Potentially Vulnerable Area can be
found in Chapter 3 of this Plan. 
This local flood risk management plan also introduces new Objective Target Areas
(OTAs), which are located within potentially vulnerable areas and should benefit from
objectives and actions to manage flood risk. These objectives and actions to manage
flooding have been set for each target area in the flood risk management plans. The
OTAs are based on communities at risk of flooding. 
Organisations such as Scottish Water, energy companies and Historic Environment
Scotland actively maintain and manage their own assets, including the risk of
flooding. These actions are not detailed further in the Local Flood Risk Management
Plans.

Page 34

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 33 
Return to Contents Page 
Figure 2 - Potentially Vulnerable Areas in the Tay Local Plan District
(Reproduced from the Tay Flood Risk Management Plan, SEPA, December 2021)

Page 35

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 34 
Return to Contents Page
Table 3: Summary of Actions to Manage Flood Risk Within PVAs During 2022-2028 
General Actions Specific Actions
Local
Plan
District
PVA OTA Location
Awareness Raising
Data to Support Climate Resilience
Emergency Plans
Flood Forecasting
Flood W
arning Development Framework
Future Flood Risk Management Planning
Guidance Development
Hazard Mapping Updates
Land Use Planning
Maintenance
Natural Flood Management Mapping
National Flood Risk Assessment
National Surface W
ater Mapping
Reservoirs 
Scottish Flood Defence Asset Database
Self Help
Adaptation Planning 
Community Engagement 
Community Resilience Group 
Flood Protection Scheme or W
orks 
Flood Study 
Flood W
arning Maintenance 
Maintenance of Existing Flood Scheme 
Sewer Flood Risk Assessment 
Surface W
ater Management Plan 
Tay
Estuary 07/09 235 Invergowrie ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓   ✓ 
Tay 08/01 172 Blair Atholl ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓  ✓    
08/02 254 Pitlochry ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓  ✓   
08/03 182 Weem ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓      ✓ ✓  
183 Aberfeldy ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓  ✓   ✓
08/04 189 Alyth  ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓  ✓    
08/05 230 Forfar ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓    
241 Kirriemuir ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓  
08/06 199 Blairgowrie &
Rattray ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓   ✓   ✓

Page 36

Tay Local Flood Risk Management Plan 
Chapter 2 – Managing Flood Risk | 35 
Return to Contents Page
08/07 214 Coupar Angus ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓   ✓   
08/08
179 Spittalfield ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓   ✓   
225 Dunkeld &
Birnam ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓  ✓ ✓   
273 Dalguise ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓      ✓   
08/09 194 Bankfoot ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓   ✓      
08/10 247 Luncarty ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓   ✓ 
08/11 255 Scone ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓  ✓ ✓  ✓  ✓
08/12
187 Almondbank ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓      ✓ ✓  
249 Methven ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓    
253 Perth ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
08/13 213 Comrie ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓  ✓ ✓ ✓ ✓
08/14 205 Bridge of Earn ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓   ✓ ✓ ✓ ✓ 
Forth 09/03 198 Blackford ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓     
Forth
Estuary 10/03 239 Kinross ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓ ✓ ✓   ✓ ✓ ✓
303 Milnathort ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓  ✓  ✓   ✓ ✓ ✓

Page 37

Tay Local Flood Risk Management Plan 
Chapter 3 - Potentially Vulnerable Areas | 36 
Return to Contents Page
Chapter.2 Potentially Vulnerable Areas (PVAs) 
Potentially Vulnerable Areas (PVAs) are catchments identified as being at medium to
high risk of flooding and where the impact of flooding is sufficient to justify further
assessment and appraisal. There are 14 PVAs within this Local Plan District as
shown in Figure 2. 
The main focus of this Local Flood Risk Management Plan is to manage flood risk in
these PVAs where specific actions apply in addition to the general actions (listed in
Section 2.3). The following chapter therefore details the objectives and planned
actions that have been prioritised for delivery between 2022 and 2028 in each of the
14 Potentially Vulnerable Areas (PVAs) within the Tay Local Plan District. 
The information presented is based on Section 2.3 of the Tay Flood Risk
Management Plan and includes the background to the area, the current
understanding of flood risk and the objectives for flood risk management. A number
of tables have also been provided which set out the actions to manage flooding in
the Objective target Areas and identify who will be responsible for the delivery and
implementation of the actions, along with a timetable of when the actions will be
undertaken and the coordination and funding arrangements. 
It should be noted that the general actions to manage flooding across the Local Plan
District (as set out in Section 2.3) apply to each PVA as well as the identified specific
actions set out in the following sections.

Page 38

Tay Local Flood Risk Management Plan 
Chapter 3 - Potentially Vulnerable Areas | 37 
Return to Contents Page
3.1 List of Potentially Vulnerable Areas (PVAs) 
The following table provides links to further information on these areas.
PVA Ref PVA Name Local Authority Area Page number
02/08/01 Blair Atholl Perth & Kinross 31
02/08/02 Pitlochry Perth & Kinross 50
02/08/03 Aberfeldy and Weem Perth & Kinross 55
02/08/04 Alyth Perth & Kinross 63
02/08/05 Kirriemuir and Forfar Angus 67
02/08/06 Blairgowrie and Rattray Perth & Kinross 75
02/08/07 Coupar Angus Perth & Kinross 79
02/08/08 Dunkeld and Birnam Perth & Kinross 83
02/08/09 Bankfoot Perth & Kinross 95
02/08/10 Luncarty  Perth & Kinross 98
02/08/11 Scone Perth & Kinross 102
02/08/12 Perth and Almondbank Perth & Kinross 108
02/08/13 Comrie Perth & Kinross / Stirling 123
02/08/14 Bridge of Earn Perth & Kinross 129

Page 39

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 38 
Return to Contents Page 
3.1 Blair Atholl - PVA 02/08/01 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Garry (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to the flood risk to Blair
Atholl. The main source of flooding is the River Garry and small watercourses. There
is a history of flooding in the area, with recent floods occurring as a result of river
flooding from the River Garry. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Blair Atholl  Objective Target Area 172

Page 40

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 39 
Return to Contents Page
Blair Atholl (Objective Target Area 172) 
Summary Location Map
Blair Atholl is a village in Perthshire
located on the banks of the River
garry and River Tilt. The main source
of flooding in Blair Atholl is river
flooding. There are approximately 50
people and 70 homes and
businesses currently at risk from
flooding. This is likely to increase to
80 people and 100 homes and
businesses by the 2080s due to
climate change. There are roads and
railways at risk of flooding, which may
cause travel disruption. 
(© Crown copyright and database 
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national assessment of river flooding has been improved by a
SEPA led modelling project that improved the existing flood maps.
There is a history of flooding in this area. Most recently in December 2015, Storm
Desmond caused the River Garry to flood, inundating 17 homes and businesses,
Further flooding occurred in January 2016. 
Objectives and Actions in the Blair Atholl Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): FLOOD STUDY (Ref: 17201)
Objective (ID): Reduce the risk of river flooding in Blair Atholl (Ref: 1723)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2025-2027

Page 41

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 40 
Return to Contents Page
Description:
A flood study has been recommended for Blair Atholl. The study
will build on previous work carried out in the area and consider
both current and long-term flood risk and how the area will adapt
to changes in flood risk through adaptive planning.
Coordination
Arrangement:
The study is programmed to commence in the 2025/26 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the fluvial flood risk and identify potential options for
managing that risk.
The study will be coordinated through the Tay Local Plan District
Partnership and with other related actions.
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 17202)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blair Atholl (Ref: 1722)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities will be coordinated through the Tay Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be funded from the
Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 17203)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blair Atholl (1722)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority. 
The Blair Atholl and Struan Community Resilience Group forms
part of the A9 Resilience Plan. Perth and Kinross Council will
continue to communicate and support the group on flood risk

Page 42

Tay Local Flood Risk Management Plan 
PVA 02/08/01 Blair Atholl | 41 
Return to Contents Page
matters. The resilience plan should be reviewed and updated
regularly by the group, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the Blair
Atholl and Struan Community Resilience Group to manage flood
risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding.

Page 43

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 42 
Return to Contents Page
3.2 Pitlochry - PVA 02/08/02 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to the flood risk to
Pitlochry. The main source of flooding is the River Tummel and small watercourses.
There is a long history of flooding in this area including recent flooding in August
2020. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment, this is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Pitlochry  Objective Target Area 254

Page 44

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 43 
Return to Contents Page 
Pitlochry (Objective Target Area 254) 
Summary Location Map
Pitlochry is located on the banks of
the
River Tummel within the Perth and
Kinross. The main source of flooding
is river flooding from the River
Tummel and small watercourses. 
Perth and Kinross Council has carried
out a flood study in this area which
estimated that there are
approximately 155 homes and 75
businesses currently at risk of
flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the completion
of the Pitlochry Flood Study in 2018. The national understanding of surface water
flooding was improved by a sewer flood risk assessment. 
There is a long history of flooding in the Pitlochry area. In January 1993, widespread
flooding across the Tay catchment resulted in over £20 million of damage; the flood
affected Pitlochry. In July 2002 torrential rain caused river flooding to several homes
and the local distillery. A subsequent landslide caused further damage to roads and
homes. The area was exposed to significant weather events including Storms
Desmond and Frank in December 2015 and January 2016, which resulted in flooding
in the Tay and Tummel catchments. In July 2016, the Moulin Burn flooded affecting
shops, houses and roads. Most recently flooding in August 2020 affected a number
of properties on Atholl Road. 
Objectives and Actions in the Pitlochry Target Area 
The objectives and actions for this target area are set out in the tables below.

Page 45

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 44 
Return to Contents Page
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD PROTECTION SCHEME (Ref: 25401)
Objective (ID): Reduce the risk of river flooding from the small watercourses in
Pitlochry (Ref: 2543)
Delivery Lead: Perth and Kinross Council
Status: Not Started Planned Delivery Period: To be confirmed
Description:
A flood protection scheme has been proposed for Pitlochry. A
number of potential measures were identified for different
locations, including flood defences, flood storage, managed
diversions and natural flood management. The majority of these
measures would provide a 1 in 200-year standard of protection
(including a further allowance for climate change). However, one
flood storage measure would adopt a lower 1 in 100-year
standard of protection. These measures would also mitigate
flood risk to other properties in the area but not to the same
design standard. The study recommends that Perth and Kinross
Council should select a preferred scheme and develop the
proposals further. This work will also include ongoing community
engagement as the project progresses. The scheme will then
progress to the statutory process set out under the Flood Risk
Management (Scotland) Act 2009. The detailed design will be
completed thereafter. 
Current and long-term flood risk have been considered,
including how the flood protection scheme and this area will
adapt to changes in flood risk through development of an
adaptation plan. 
Following completion of the detailed design, the proposed
scheme should be procured and will progress to construction.
As built drawings should be made available to SEPA, for
inclusion in the Scottish Flood Defence Asset Database, flood
map updates and flood warning scheme updates. 
Routine inspections and maintenance of the Pitlochry Flood
Protection Scheme should commence when the scheme is
complete in accordance with the inspection and maintenance
regime. 
In accordance with the flood risk management plan, as part of
the scheme or works, the responsible authority should aim to
ensure the action will not have an adverse effect on the integrity
of the River Tay Special Area of Conservation.
Coordination
Arrangement:
The Pitlochry Flood Protection Scheme will be coordinated
through the Tay Local Plan District Partnership. SEPA will work
with the local authority on the potential to coordinate this action
with an update to SFDAD and flood warning actions.

Page 46

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 45 
Return to Contents Page
Funding
Arrangement:
The delivery of the Pitlochry Flood Protection Scheme is subject
to capital funding being made available (up to 80% capital grant
funding from the Scottish Government with the remaining
funding being provided from Perth & Kinross Council's capital
programme). 
Action (ID): FLOOD PROTECTION WORKS (Ref: 25402)
Objective (ID): Reduce the risk of flooding from the culverts on the A9 in the
vicinity of Dalshian area in Pitlochry (Ref: 2544)
Delivery Lead: Transport Scotland
Status: TBC Planned
Delivery Period: TBC
Description:
Transport Scotland will continue to carry out civil engineering
works in connection with the A9 dualling project which will
reduce the risk of flooding on identified sections of the trunk
road.
Coordination
Arrangement: To be determined once the actions have been finalised.
Funding
Arrangement: Transport Scotland to confirm 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 25403)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Pitlochry (Ref: 2542)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in the
area by SEPA and the responsible authorities to raise
awareness of flood risk. Community engagement activity will
continue in connection with any on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Perth and Kinross Council will continue to coordinate with the
Pitlochry and Moulin Community Resilience Group on a priority
needs basis where resources allow.
Funding
Arrangement:
Community engagement activities will be subject to funding from
the Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure.

Page 47

Tay Local Flood Risk Management Plan 
PVA 02/08/02 Pitlochry | 46 
Return to Contents Page
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 25404)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Pitlochry (Ref: 2542)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Pitlochry and Moulin Community Resilience group operates
in this area. Perth and Kinross Council will continue to
communicate and support the group on flood risk matters. The
resilience plan should be reviewed and updated regularly by the
group, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Pitlochry and Moulin Community Resilience Group to manage
flood risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 25405)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Pitlochry (Ref: 2542)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. SEPA will maintain the River Tay flood
warning scheme.
Coordination
Arrangement:
SEPA will continue to raise awareness of flood warning, and
engage with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement.

Page 48

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 47 
Return to Contents Page
3.3 Aberfeldy and Weem - PVA 02/08/03 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Aberfeldy
and Weem. The main sources of flooding are the River Tay and the Moness Burn,
and there is also risk from surface water. There is a history of flooding in this area,
with recent floods being caused by surface water. 
List of Objective Target Areas 
There are two target areas in this potentially vulnerable area, which have been the
focus of further assessment. These are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Weem   Target Area 182
Aberfeldy  Target Area 183

Page 49

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 48 
Return to Contents Page 
Weem (Objective Target Area 182) 
Summary Location Map
The village of Weem is located near
the town of Aberfeldy within Perth and
Kinross. The main source of flooding
in Weem is river flooding with a small
proportion of risk coming from surface
water. A flood protection scheme is in
place that offers protection to the
community. There are approximately
40 people and 30 homes and
businesses at risk from flooding. This
is estimated to increase to 50 people
and 40 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011, SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the Aberfeldy
Flood Study which was completed in 2019. The study also assessed flooding in
Weem and reviewed the standard of protection offered by the existing flood scheme. 
There is a long record of flooding in this area. Recent significant floods have
occurred in January 1993, January 2005, December 2006 and in December 2015.
The most recent flood was recorded in January 2020 when the Aberfeldy to Weem
road was closed due to flooding caused by Storm Dennis. 
Objectives and Actions in the Weem Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 50

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 49 
Return to Contents Page
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 18201)
Objective (ID): Avoid an increase in flood risk by the appropriate management
and maintenance of Weem Flood Protection Scheme (Ref:1822)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the existing Weem Flood Protection Scheme will
continue in accordance with the existing inspection and
maintenance regime. Further maintenance work will also be
carried out as identified by the recent review undertaken as part
of the Aberfeldy flood study.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth and Kinross Council’s revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 18202)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Weem (Ref: 1823)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage
with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement.

Page 51

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 50 
Return to Contents Page
Aberfeldy (Objective Target Area 183) 
Summary Location Map
Aberfeldy is located on the River Tay
within the Perth and Kinross. The
main source of flooding in Aberfeldy is
river flooding, however there is also a
risk from surface water flooding.
Perth and Kinross Council carried out
a flood study in this area which
estimated that there are
approximately 128 homes and 40
businesses are at risk of flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the Aberfeldy
Flood Study, which was completed in 2019. The national understanding of surface
water flooding is improved by a sewer flood risk assessment undertaken by Scottish
Water. 
There is a long record of flooding in this area. Significant floods have occurred in
January 1993, January 2005, December 2006 and in December 2015. The most
recent flooding was recorded in February 2020 during Storm Dennis when surface
water runoff from fields caused flooding to 2 properties as well as flooding to roads.
Further surface water flooding occurred in February 2021, however there is no
record of properties being affected internally. 
Objectives and Actions in the Aberfeldy Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 52

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 51 
Return to Contents Page
Action (ID): FLOOD PROTECTION SCHEME (Ref: 18301)
Objective (ID): Reduce the risk of surface water and river flooding from the River
Tay and Moness Burn in Aberfeldy (Ref: 1833)
Delivery Lead: Perth and Kinross Council
Status: Not Started Planned Delivery Period: To be confirmed
Description:
A flood protection scheme has been proposed in this area. The
proposed scheme would consist of flood walls and embankments
on the River Tay and the Moness Burn, along with culvert
improvements on the Tomchulan Burn. The proposed scheme
would provide a 1 in 200 year standard of protection. Current and
long-term flood risk will be further considered at the design stage
including the impacts of climate change and scheme adaptability.
The outline design for the Aberfeldy Flood Protection Scheme will
be progressed, in line with the recommendations of the Aberfeldy
flood study. The flood study also recommended further
consideration of natural flood management as part of the
preferred option. This work is to also include ongoing community
engagement as the project progresses. 
Once the flood protection scheme has been confirmed and the
detailed design completed, the next stages are procurement then
construction. 
As built drawings will be made available to SEPA, for inclusion in
the Scottish Flood Defence Asset Database, flood map updates
and flood warning scheme updates. 
Routine inspections and maintenance of the Aberfeldy Flood
Protection Scheme would commence when the scheme is
complete in accordance with the inspection and maintenance
regime.
In accordance with the flood risk management plan, as part of the
scheme or works, Perth and Kinross Council will aim to ensure
the action will not have an adverse effect on the integrity of the
River Tay Special Area of Conservation.
Coordination
Arrangement:
The Aberfeldy Flood Protection Scheme will be coordinated
through the Tay Local Plan District Partnership. SEPA will work
with the local authority on the potential to coordinate this action
with an update to SFDAD and flood warning actions.
Funding
Arrangement:
The delivery of the Aberfeldy Flood Protection Scheme is subject
to capital funding being made available (up to 80% capital grant
funding from the Scottish Government with the remaining funding
being provided from Perth & Kinross Council's capital
programme). 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 18302)
Objective (ID): Reduce the risk of surface water and river flooding from the River
Tay and Moness Burn in Aberfeldy (Ref: 1833)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned
Delivery Period: 2025 - 2027

Page 53

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 52 
Return to Contents Page
Description:
Perth & Kinross Council will engage consulting engineers to
develop a surface water management plan for Aberfeldy. This will 
investigate the surface water flood risk and identify potential
options for managing that risk. The results of the sewer flood risk
assessment will be considered. Current and long term flood risk
will be assessed and if climate change impacts are found to be
significant, surface water management should include adaptive
planning.
Coordination
Arrangement:
The surface water management plan is programmed to
commence in the 2026/26 financial year and will be coordinated
through the Tay Local Plan District Partnership.
Scottish Water will support surface water management planning
through ensuring that best available knowledge and data is used
to input into the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 18303)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Aberfeldy (Ref: 1832)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. 
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with any on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities will be coordinated through the Tay Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Perth and Kinross Council will continue to coordinate with the
Aberfeldy Resilience Group and the Tayside Waders Group on a
priority needs basis where resources allow.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUPS (Ref: 18304)
Objective (ID): Prepare for current flood risk and future flooding as a result
of climate change in Aberfeldy (Ref: 1832)

Page 54

Tay Local Flood Risk Management Plan 
PVA 02/08/03 Aberfeldy & Weem | 53 
Return to Contents Page
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
Perth and Kinross Council will continue to liaise with the Aberfeldy
Resilience Group and the Tayside Waders Group on flood risk
matters. Their resilience plans should be reviewed and updated
regularly, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Aberfeldy Resilience Group and the Tayside Waders to manage
flood risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow
Funding
Arrangement:
Funding for Community resilience groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 18305)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Aberfeldy (Ref: 1832)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement.

Page 55

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 54 
Return to Contents Page
3.4 Alyth - PVA 02/08/04 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council Alyth Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to the flood risk at Alyth.
The main source of flooding is the Alyth Burn. There is a history of flooding in this
area, with recent flooding recorded in August 2020. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Alyth  Objective Target Area 189

Page 56

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 55 
Return to Contents Page 
Alyth (Objective Target Area 189) 
Summary Location Map
The town of Alyth is located 6km
northeast of Blairgowrie within Perth
and Kinross. The main source of
flooding is river flooding from the Alyth
Burn. 
There are approximately 180 people
and 120 homes and businesses
currently at risk of flooding. This is
likely to increase to 240 people and
150 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. Pervious work has underpinned the understanding of river flooding and the
Joint Agency Report on the Flooding in Alyth of 17 July 2015 further improved the
understanding of flooding mechanisms in this area.
There are records of frequent flooding in this area. A significant flood was recorded
in July 2015 when the Alyth Burn burst its banks, affecting many homes and
businesses. A notable flood occurred in August 2020, when the Alyth Burn and other
small watercourses overtopped resulting in flooding of properties. Further flooding
occurred in October 2020 and October 2021 but no properties in the area were
flooded. 
Objectives and Actions in the Alyth Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 57

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 56 
Return to Contents Page
Action (ID): FLOOD STUDY (Ref: 18901)
Objective (ID): Reduce the risk of river flooding from the Alyth Burn in Alyth (Ref:
1893).
Delivery Lead: Perth and Kinross Council
Status: On-going Planned Delivery Period: 2022-2023
Description:
A natural flood management study is underway for Alyth as
identified in the published Cycle 1 Tay Flood Risk Management
Strategy and Local Flood Risk Management Plan. The study is
considering both current and long-term flood risk and how the
area will adapt to changes in flood risk due to climate change.
Coordination
Arrangement:
The study commenced in January 2022. Perth and Kinross
Council has engaged consulting engineers, AECOM, to
investigate the fluvial flood risk and identify potential options for
managing that risk. The study is being coordinated through the
Tay Local Plan District Partnership.
Funding
Arrangement:
The study is being funded from Perth and Kinross Council’s
revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 18902)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Alyth (Ref: 1892).
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
This will include continuing to support the Alyth Community
Support Group and updating the community on the outcomes of
the natural flood management study. 
Funding
Arrangement:
Community engagement activities will be subject to funding from
the Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 18903)
Objective (ID): Prepare for current flood risk and future flooding as a result
of climate change in Alyth (Ref: 1892).

Page 58

Tay Local Flood Risk Management Plan 
PVA 02/08/04 Alyth | 57 
Return to Contents Page
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority. 
The Alyth Community Support Group has been set up and has
developed a community resilience plan, alongside other resilience
work. The resilience plan should be reviewed and updated
regularly by the group, and this will be supported by the Council.
Coordination
Arrangement:
Perth and Kinross Council will continue to coordinate with the
Alyth Community Support Group to manage flood risk, improve
preparedness and increase resilience against flooding. The
Council will continue to co-ordinate with the group on a priority
needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding

Page 59

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 58 
Return to Contents Page
3.5 Kirriemuir & Forfar - PVA 02/08/05 
Local Plan District Local Authority Main Catchment
Tay Angus Council River Isla (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Kirriemuir
and Forfar. The main source of flooding is surface water. There is also risk of river
flooding to Forfar from the Dean Water and to Kirriemuir from the Gairie Burn. There
is a history of flooding in this area, with recent floods being caused by surface water. 
List of Objective Target Areas 
There are two target areas in this potentially vulnerable area, which has been the
focus of further assessment. These are identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Forfar    Target Area 230
Kirriemuir   Target Area 241

Page 60

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 59 
Return to Contents Page 
Forfar (Objective Target Area 230) 
Summary Location Map
Forfar is a town located north of
Dundee and within the Angus Council
Area. The main source of flooding in
Forfar is surface water flooding,
however there is a risk of river
flooding. There are approximately 870
people and 590 homes and
businesses currently at risk from
flooding. This is likely to increase to
1,100 people and 700 homes and
businesses by the 2080s due to
climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national assessment has been improved by flood studies
undertaken by Angus Council and Scottish Water. There is a history of localised
flooding in this area. 
Objectives and Actions in the Forfar Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD STUDY (OPTIONS APPRAISAL) (Ref: 23001)
Objective (ID): Reduce the risk of river and surface water flooding in Forfar (Ref:
2303)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description: Angus Council will review the 2019 flood study outcomes and
consider whether an additional detailed study of Forfar Loch and

Page 61

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 60 
Return to Contents Page
Dean Water interaction will provide further opportunities for
actions to reduce flood risk in the Forfar area. The additional
detailed study will focus on the interaction of surface water
flooding locations which discharge to Forfar Loch and the Forfar
Loch to Dean Water interaction.
Coordination
Arrangement:
The study is programmed to commence in the [TBC] financial
year. Angus Council will engage a consulting engineer to
investigate the fluvial and pluvial flood risk and identify potential
options for managing that risk.
The study will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement:
The flood study will be subject to funding from Angus Council’s
revenue budget. 
Action (ID): ADAPTION PLAN (23002)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Forfar (Ref: 2302)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
An adaptation master plan will be developed to cover the Angus
Council area. As part of this, Angus Council will use best
available knowledge on climate change predictions to assess the
effect on flood risk infrastructure. From this a long term flood risk
management approach will be developed. Any existing strategic
initiatives will provide opportunities for adaptive actions to be
implemented.
Coordination
Arrangement:
The adaptation plan is programmed to commence in the [TBC]
financial year. Angus Council will engage a consulting engineer to
develop the adaptation plan.
The adaptation plan will be coordinated through the Tay Local
Plan District Partnership.
Funding
Arrangement:
The adaptation plan will be subject to funding from Angus
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGMENT (Ref: 23003)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Forfar (Ref: 2302)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with any on-going projects and activities.
Coordination
Arrangement:
The community will have opportunities to get involved with the
development of the adaptation plan and any flood related projects
and initiatives being developed for Forfar. This will include the
flood study and the adaptation plan

Page 62

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 61 
Return to Contents Page
Funding
Arrangement:
Community engagement activities will be funded from the
Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure.

Page 63

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 62 
Return to Contents Page
Kirriemuir (Objective Target Area 241) 
Summary Location Map
The town of Kirriemuir is located
northwest of Forfar within the Angus
area. 
The main sources of flooding in
Kirriemuir are surface water and river
flooding. There are approximately 140
people and 80 homes and businesses
currently at risk from flooding. This is
likely to increase to 180 people and
110 homes and businesses by the
2080s due to climate change 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national assessment has been improved by flood studies
undertaken by Angus Council and Scottish Water. There is a history of localised
flooding in this area. 
Objectives and Actions in the Kirriemuir Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): FLOOD SCHEME OR WORKS IMPLEMENTATION (Ref: 24101)
Objective (ID): Reduce the risk of river flooding from the Gairie Burn in Kirriemuir
(Ref: 2415)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
A flood study carried out for this location recommended a short-
term option to manage flood risk. The preferred option consists of
property flood resilience and localised kerb raising. It will be used
in conjunction with the installation of a river gauge on the Gairie
Burn to improve understanding of flood risk and support future

Page 64

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 63 
Return to Contents Page
work.
In accordance with the flood risk management plan, as part of the
scheme or works, the responsible authority should aim to ensure
that the action will not have an adverse effect on the integrity of
the Loch of Kinnordy Special Protection Area.
Coordination
Arrangement:
The works will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement: TBC 
Action (ID): DATA COLLECTION (Ref: 24102)
Objective (ID): Improve data and understanding of river flooding from the Gairie
Burn in Kirriemuir (Ref: 2413)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
Angus Council will review the Kirriemuir flood study of 2019 and
prepare a contract for installation of flow monitoring on the Gairie
Burn to reduce the uncertainty around flow estimation identified in
the 2019 study. This will improve confidence levels in the flood
study findings and allow the impact of climate change to be
assessed for Kirriemuir.
Coordination
Arrangement:
The work will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement:
This work will be subject to funding from Angus Council’s revenue
budget. 
Action (ID): ADAPTION PLAN (Ref: 24103)
Objective (ID): Improve data and understanding of river flooding from the Gairie
Burn in Kirriemuir (Ref: 2413)
Delivery Lead: Angus Council
Status: TBC Planned Delivery Period: TBC
Description:
Information on climate change is to be used to develop an
adaptation plan to allow for the impacts of climate change to be
monitored, understood and managed. 
An adaptation master plan will be developed to cover the Angus
Council area. As part of this, Angus Council will use best
available knowledge on climate change predictions to assess the
effect on flood risk infrastructure. From this a long term flood risk
management approach will be developed. Any existing strategic
initiatives will provide opportunities for adaptive actions to be
implemented. 
Coordination
Arrangement:
The adaptation plan is programmed to commence in the [TBC]
financial year. Angus Council will engage a consulting engineer to
develop the adaptation plan.
The adaptation plan will be coordinated through the Tay Local
Plan District Partnership.

Page 65

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 64 
Return to Contents Page
Funding
Arrangement:
The adaptation plan will be subject to funding from Angus
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 24104)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Kirriemuir (Ref: 2414)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities.
Coordination
Arrangement:
The community will have opportunities to get involved with the
development of the adaptation plan and any flood related projects
and initiatives being developed for Kirriemuir. Angus Council will
consider whether there is potential for provision of a community
flood warning system (such as River Track) as part of a wider
flood resilience approach for Kirriemuir and will discuss this with
partners. 
Funding
Arrangement:
Community engagement activities will be funded from the
Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): FLOOD DEFENCE MAINTENANCE (Ref: 24105)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of Kirriemuir Flood Protection Scheme (Ref:
2412)
Delivery Lead: Angus Council
Status: Existing Planned Delivery Period: On-going
Description:
Angus Council will continue to maintain the flood defences on the
Gairie Burn and seek opportunities to work with partners to
reduce flood risk to existing commercial property impacted by the
burn.
Coordination
Arrangement:
Angus Council maintain existing flood protection schemes
through a programme of inspections carried out in accordance
with the recommendations set out in the scheme maintenance
manuals. Maintenance works will be coordinated with SEPA,
NatureScot, landowners and other stakeholders as required.
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Angus Council’s revenue budget.

Page 66

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 65 
Return to Contents Page
3.6 Blairgowrie & Rattray - PVA 02/08/06 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Ericht (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to
Blairgowrie and Rattray. The main source of flooding in Blairgowrie is surface water.
There is a history of flooding in this area with recent flooding recorded in August
2020, October 2021 and November 2022. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Blairgowrie and Rattray  Target Area 199

Page 67

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 66 
Return to Contents Page
Blairgowrie and Rattray (Objective Target Area 199) 
Summary Location Map
This community includes the towns of
Blairgowrie and Rattray. The main
source of flooding is surface water.
There are approximately 750 people
and 440 homes and businesses
currently at risk from flooding. This is
likely to increase to 1,100 people and
630 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. Scottish Water has delivered an assessment of flood risk within the
Blairgowrie sewer catchment.
There is a long record of flooding in this target area. In July 2004 a road and 2
properties were affected by surface water flooding. In July, October and December
2015 heavy rainfall led to flooding of a number of properties as well as road flooding.
Flooding was recorded on 12 August 2020 when local roads and 5 properties
flooded as a result of heavy rainfall in the area. In October 2021 flooding on the
Rattray Burn affected 1 property in Rattray. Further flooding occurred on the Rattray
Burn in November 2022.
Objectives and Actions in the Blairgowrie and Rattray Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 68

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 67 
Return to Contents Page
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 19901)
Objective (ID): Reduce the risk of surface water flooding in Blairgowrie
and Rattray (Ref: 1993)
Delivery Lead: Perth and Kinross Council
Status: Started  Planned Delivery Period: 2022 - 2024
Description:
Perth and Kinross Council has engaged consulting engineers to
develop a surface water management plan for Blairgowrie and
Rattray. This will investigate the surface water flood risk and
identify potential options for managing that risk. The results of the
sewer flood risk assessment will be considered. Current and long-
term flood risk will be assessed and if climate change impacts are
found to be significant, surface water management should include
adaptive planning.
Coordination
Arrangement:
The surface water management plan is programmed to be
concluded in the 2023/24 financial year and is being coordinated
through the Tay Local Plan District Partnership.
Scottish Water will support surface water management planning
through ensuring that best available knowledge and data is used
to input into the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 19902)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blairgowrie and Rattray (Ref: 1992)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with any on-going projects and activities.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities will be coordinated through the Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 19903)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blairgowrie and Rattray (Ref: 1992)

Page 69

Tay Local Flood Risk Management Plan 
PVA 02/08/06 Blairgowrie & Rattray | 68 
Return to Contents Page
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority. 
Blairgowrie Community Resilience Group is active in this area.
The resilience group should continue to implement the
community emergency plan.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Blairgowrie Community Resilience Group to manage flood risk,
improve preparedness and increase resilience against flooding.
The Council will continue to co-ordinate with the group on a
priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 19904)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Blairgowrie and Rattray (Ref: 1992)
Delivery Lead: SEPA
Status: Existing  Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Coordination
Arrangement:
SEPA will maintain the Ericht flood warning scheme. SEPA will
continue to raise awareness of flood warning, and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.

Page 70

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 69 
Return to Contents Page
3.7 Coupar Angus - PVA 02/08/07 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council Coupar Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Coupar
Angus. The main source of flooding is the Coupar Burn. There is history of flooding
in this area with recent floods caused by river flooding. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below.  
Coupar Angus  Target Area 214

Page 71

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 70 
Return to Contents Page 
Coupar Angus (Objective Target Area 214) 
Summary Location Map
Coupar Angus is located to the
northeast of Perth on the banks of the
River Isla within Perth and Kinross.
The main source of flooding in Coupar
Angus is river flooding from the
Coupar Burn and small tributaries. A
local detailed flood study undertaken
by Perth and Kinross Council
indicates that there are approximately
30 homes and businesses currently at
risk of flooding, and that this may
increase to 62 homes and businesses
in the future due to climate change.   
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is improved by the Coupar Burn
Flood Study completed in 2016 and the SEPA modelling study to improve flood
maps in the area. The study concluded that structural actions such as a flood
protection scheme were not viable.
There is a long history of flooding in this area from the Coupar Burn including
flooding in August 2004 and December 2012, when several homes and businesses
flooded from Coupar Burn. In December 2015, Storm Frank caused prolonged
rainfall across Perth & Kinross. Several roads were affected in the Coupar Angus
area. Flooding on the Coupar Burn occurred in February 2021 and November 2022
but there is no record of properties being affected. 
Objectives and Actions in the Coupar Angus Objective Target Area 
The objectives and actions for this target area are set out in the tables below. 
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 72

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 71 
Return to Contents Page 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 21401)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Coupar Angus (Ref: 2143)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
Coordination
Arrangement:
SEPA will maintain the Isla flood warning scheme. SEPA will
continue to raise awareness of flood warning, and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 21402)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Coupar Angus (Ref: 2143)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by the
local authority. 
The Coupar Angus Community Resilience Group operates in this
area. Perth and Kinross Council will continue to communicate and
support the group on flood risk matters. The resilience plan should
be reviewed and updated regularly by the group, and this will be
supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the Coupar
Angus Community Resilience Group to manage flood risk, improve
preparedness and increase resilience against flooding. The Council
will continue to co-ordinate with the group on a priority needs basis
where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): LAND USE PLANNING (Ref: 21403)
Objective (ID): Avoid development that increases flood risk in Coupar Angus (Ref:
2141)
Delivery Lead: Perth & Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
As planning authority, Perth and Kinross Council will ensure that
their development plan and planning decision-making supports the
delivery of sustainable flood management. Perth and Kinross

Page 73

Tay Local Flood Risk Management Plan 
PVA 02/08/07 Coupar Angus | 72 
Return to Contents Page
Council will introduce protection for the Kettins Burn natural flood
storage area through the local development planning process. 
Coordination
Arrangement:
Existing controls are already in place as set out under the Land
Use Planning action. Perth and Kinross Council will further align
the flood risk management and land use planning systems in this
location. The Council will coordinate land use planning with other
related actions. 
Funding
Arrangement:
Planning activities are subject to funding from Perth and Kinross
Council’s revenue budget.

Page 74

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 73 
Return to Contents Page
3.8 Dunkeld & Birnam - PVA 02/08/08 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Dunkeld
& Birnam, Dalguise and Spittalfield. The main source of flood risk is the River Tay,
the River Braan and small watercourses in Dunkeld and Birnam. The main source of
flood risk in Dalguise and Spittalfield is the River Tay. There is history of flooding in
the area.   
List of Objective Target Areas 
There are three objective target areas in this potentially vulnerable area, which have
been the focus of further assessment. These are listed below. Further information on
the objectives and actions to manage flood risk within this area is provided below. 
Spittalfield   Target Area 179
Dunkeld & Birnam  Target Area 225
Dalguise   Target Area 273

Page 75

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 74 
Return to Contents Page 
Spittalfield (Objective Target Area 179) 
The small settlement of Spittalfield is
located near the River Tay in Perth
and Kinross. 
The main concern is flooding from the
River Tay to homes and the A984,
and how this risk may change in future
because of climate change. SEPA's
flood maps indicate that currently
there are approximately 6 homes and
businesses at risk from flooding. This
is estimated to increase to 40 homes
and businesses by the 2080s due to
climate change. However, Perth and
Kinross Council has carried out a
flood study in this area which predicts
that this number is higher with an
estimated 18 homes and businesses
currently at risk, which is likely to
increase to 50 due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by a recent flood
study.
There is a record of periodic flooding in this area. The first flood recorded in the area
occurred in January 1993 when heavy rain and snow melt inundated roads around
the Green. Further flooding occurred in 2006 with property flooding and the A894
being affected. The most recent flood was recorded in December 2015 due to Storm
Desmond, when roads and properties were affected. In January 2018 surface water
flooding was reported in Spittalfield however there is no record of properties being
affected by flooding. 
Objectives and Actions in the Spittalfield Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 76

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 75 
Return to Contents Page 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 17901)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Spittalfield (Ref: 1792)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Spittalfield and Caputh Community Resilience Group
operates in this area. Perth and Kinross Council will continue to
communicate and support the group on flood risk matters. The
resilience plan should be reviewed and updated regularly by the
group, and this will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Spittalfield and Caputh Community Resilience Group to manage
flood risk, improve preparedness and increase resilience against
flooding. The Council will continue to co-ordinate with the group
on a priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): EMERGENCY PLAN (Ref: 17902)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Spittalfield (Ref: 1792)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2022 - 2028
Description:
The plan to coordinate responses to emergency incidents
between organisations, including local authorities, the emergency
services and SEPA, is to be maintained and executed as
required.
Perth and Kinross Council will include specific emergency
planning arrangements for Spittalfield within its current Generic
Emergency Plan and Flooding Emergency Response Plan.
Coordination
Arrangement:
Perth & Kinross Council has developed a Generic Emergency
Plan and a Flooding Emergency Response Plan, designed to
ensure that contingency measures are in place for the
coordinated and flexible response to flooding incidents to mitigate
the effects of flooding emergencies.
SEPA flood alerts and warnings will be monitored, and resources
made ready as required. An emergency response will follow any
reports of flooding, will be coordinated with regional and local
resilience partnerships and may be supported by the work of
voluntary organisations. A debrief and plan review will be carried
out following any flood events.

Page 77

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 76 
Return to Contents Page
Protecting property from flooding is the responsibility of the owner
of the property, but local authorities can sometimes provide
sandbags to properties. Unfortunately the Council only has the
resources to supply sandbags to residents where there is an
imminent risk of flooding.
Funding
Arrangement:
Emergency response activities are subject to funding from Perth
and Kinross Council’s revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 17903)
Objective (ID): Prepare for current flood risk and future flooding as a result 
of climate change in Spittalfield (Ref: 1792)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: 2022-2028
Description:
SEPA will maintain the River Tay flood warning scheme. The
Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being
undertaken as required
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning, and engage
with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.

Page 78

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 77 
Return to Contents Page
Dunkeld & Birnam (target area 225) 
Summary Location Map
The villages of Dunkeld, Little Dunkeld
and Birnam are located on the River
Tay and within Perth and Kinross. 
The main source of flooding in
Dunkeld and Birnam is river flooding
from the River Tay, the River Braan
and other small watercourses. A
recent flood study undertaken by Perth
and Kinross Council indicates that
there are approximately 104 homes
and businesses currently at risk of
flooding. This is likely to increase to
149 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is being improved by a current
flood study in the area.
There is a long record of flooding in this area, including notable flooding in February
1990 and January 1993. Further localised flooding occurred on the Spoutwells Burn,
at Burnmouth Road and at Inver in August 2004. In December 2015 and January
2016, Storms Desmond and Frank caused prolonged rainfall throughout Perth and
Kinross and properties and roads were affected in the Dunkeld area. The most
recent flooding occurred in February 2020, with properties on Atholl Gardens being
threatened by flooding from the Sawmill Burn
Objectives and Actions in the Dunkeld & Birnam Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 79

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 78 
Return to Contents Page
Action (ID): FLOOD STUDY (Ref: 22501)
Objective (ID): Reduce the risk of river flooding from the River Tay, River
Braan and small watercourses in Dunkeld (Ref: 2255)
Delivery Lead: Perth & Kinross Council
Status: Existing Planned Delivery Period: 2020 - 2023
Description:
A flood protection study for Dunkeld was included in the Cycle 1
Tay Local Flood Risk Management Plan. The study is underway
and is being carried out as planned. The study is considering
current and future flood risk and the potential impacts of climate
change. 
Coordination
Arrangement:
The study commenced in January 2020. Perth and Kinross
Council engaged consulting engineers, AECOM, to investigate the
fluvial flood risk and identify potential options for managing that
risk. 
The study has involved the completion of existing investigations
by previous consulting engineers, Mouchel, into the flooding on
Atholl Gardens and Atholl Street, Dunkeld from the Spoutwells
Burn and another small watercourses. The study also took a
staged approach to allow coordination with SEPA on the Strategic
Mapping and Modelling Action for the River Tay (Cycle 1 Action
ID 80410016). 
The study has been coordinated through the Tay Local Plan
District Partnership.
Funding
Arrangement:
The flood study has been funded from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 22502)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dunkeld and Birnam (Ref: 2252)
Delivery Lead: SEPA and responsible authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in area by
SEPA and the responsible authorities to raise awareness of flood
risk. Community engagement activity will continue in connection
with any on-going projects and activities.
Coordination
Arrangement:
Perth and Kinross will continue to coordinate with the Dunkeld
Community Resilience Group on a priority needs basis where
resources allow. 
Awareness raising and community engagement will take place
around any projects and will be coordinated through the Local
Plan District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.

Page 80

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 79 
Return to Contents Page
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 22503)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dunkeld and Birnam (Ref: 2252)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Dunkeld Community Resilience Group operates in this area.
Perth and Kinross Council will continue to communicate and
support the group on flood risk matters. The resilience plan
should be reviewed and updated regularly by the group, and this
will be supported by the Council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Dunkeld Community Resilience Group to manage flood risk,
improve preparedness and increase resilience against flooding.
The Council will continue to co-ordinate with the group on a
priority needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 22504)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dunkeld and Birnam (Ref: 2252)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: 2022-2028
Description:
SEPA should maintain the River Tay flood warning scheme. The
Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being
undertaken as required.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning, and engage
with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.

Page 81

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 80 
Return to Contents Page
Dalguise (Objectve Target Area 273) 
Summary Location Map
The small settlement of Dalguise is
located on the western side of the
River Tay and within Perth and
Kinross. 
The main source of flooding in
Dalguise is river flooding. There are
approximately 20 people at risk from
flooding and approximately 20 homes
and businesses. There is also risk to
an activity centre, railway line and
local roads that become inundated
resulting in the community being cut
off. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national level assessments of flooding from rivers, surface water and
coastal sources. The national understanding of flooding in this area was also
improved by a previous flood study. This study did not identify a viable structural
flood management solution.
There is a long record of flooding in this area. In January 1993, a significant weather
event flooded 6 properties and caused extensive damage to the Perth to Inverness
railway line. In December 2006, 4 properties were flooded and again the railway line
was closed. The most recent flood was recorded in December 2018 when the
Dalguise Burn and River Tay inundated local roads.
Objectives and Actions in the Dalguise Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): EMERGENCY PLAN (Ref: 27301)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dalguise (Ref: 2732)
Delivery Lead: Perth and Kinross Council

Page 82

Tay Local Flood Risk Management Plan 
PVA 02/08/08 Dunkeld & Birnam | 81 
Return to Contents Page
Status: Not started Planned Delivery Period: 2023
Description:
Perth and Kinross Council will include specific emergency
planning arrangements for Dalguise within its current Generic
Emergency Plan and Flooding Emergency Response Plan. 
Coordination
Arrangement:
Perth & Kinross Council has developed emergency response
plans, designed to ensure that contingency measures are in place
for the coordinated and flexible response to flooding incidents to
mitigate the effects of flooding emergencies.
SEPA flood alerts and warnings will be monitored, and resources
made ready as required. An emergency response will follow any
reports of flooding, will be coordinated with regional and local
resilience partnerships and may be supported by the work of
voluntary organisations. A debrief and plan review will be carried
out following any flood events.
Protecting property from flooding is the responsibility of the owner
of the property, but local authorities can sometimes provide
sandbags to properties. Unfortunately, Councils only have the
resources to supply sandbags to residents where there is an
imminent risk of flooding.
SEPA will work with Perth and Kinross Council on the potential to
coordinate this action with flood warning actions.
Funding
Arrangement:
Funding is allocated to category 1 and 2 responders by the
Scottish Government for dealing with emergency response and in
extreme cases may reimburse responders after an extreme event.
Emergency response activities are subject to funding from Perth
and Kinross Council’s revenue budget. SEPA’s role in this action
is funded by Scottish Government through SEPA’s grant in aid
settlement. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 27302)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Dalguise (Ref: 2732)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
SEPA will maintain the River Tay flood warning scheme. 
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
Coordination
Arrangement:
SEPA will continue to raise awareness of flood warning and
engage with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement.

Page 83

Tay Local Flood Risk Management Plan 
PVA 02/08/09 Bankfoot | 82 
Return to Contents Page
3.9 Bankfoot - PVA 02/08/09 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council Garry Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Bankfoot.
The main source of flooding is the Garry Burn and Glenhauch Burn. There is a
history of flooding in this area, with recent floods being caused by river flooding. 
List of Objective Target Areas 
There is 1 target area in this potentially vulnerable area, which has been the focus of
further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Bankfoot  Target Area 194

Page 84

Tay Local Flood Risk Management Plan 
PVA 02/08/09 Bankfoot | 83 
Return to Contents Page 
Bankfoot (target area 194) 
Summary Location Map
The village of Bankfoot lies
approximately 13km north of Perth,
within the Perth and Kinross. 
The main source of flooding in
Bankfoot is river flooding. The local
authority has carried out a flood study
in this area which estimated that there
are approximately 154 homes and
businesses at risk of flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk   
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by a flood study
completed for Bankfoot in 2015. The study concluded that a flood scheme was not
viable. The study described how on-going flood risk would be managed by other
actions.
There is a long history of flooding in this area, including notable flooding in January
1993, August 2004, July 2015 and February and October 2020. In February 2020
during Storm Dennis, the Garry Burn burst its banks, inundating a number of roads.
Some surface water flooding occurred in October 2020. Further minor flooding
occurred on the Garry Burn in February 2021. The most recent flooding occurred in
June 2022, when surface water runoff from fields affected the B867 and the gardens
of adjacent properties. 
Objectives and Actions in the Bankfoot Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 85

Tay Local Flood Risk Management Plan 
PVA 02/08/09 Bankfoot | 84 
Return to Contents Page
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 19401)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Bankfoot (Ref: 1942)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
Perth and Kinross Council will continue to communicate with and
support the Auchtergaven Community Council and Bankfoot
Resilience Group on flood risk matters. The resilience plans
should be updated regularly by these groups, and this will be
supported by the council.
Coordination
Arrangement:
Perth & Kinross Council will continue to coordinate with the
Bankfoot Resilience Group to manage flood risk, improve
preparedness and increase resilience against flooding. The
Council will continue to co-ordinate with the group on a priority
needs basis where resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding.

Page 86

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 85 
Return to Contents Page
3.10 Luncarty - PVA 02/08/010 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Luncarty.
The main sources of flooding are surface water and the River Tay and its tributaries.
River flood risk is likely to increase significantly because of climate change. A
number of floods have been recorded in this area. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Luncarty  Target Area 247

Page 87

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 86 
Return to Contents Page 
Luncarty (target area 247) 
Summary Location Map
Luncarty lies 6km north of Perth, near
the River Tay and within Perth and
Kinross. 
The main sources of flooding in
Luncarty are river flooding and surface
water flooding. There are
approximately 160 people and 90
homes and businesses currently at
risk of flooding. This is likely to
increase to 250 people and 130
homes and businesses by the 2080s
due to climate change. River flood risk
is likely to increase significantly
because of climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources, and this information has highlighted the risk of flooding in this area.
There are limited records of flooding in this area. Flooding occurred in January 1993
and further minor floods have been noted in February 2002, January 2005, July and
November 2009 and in July 2015 in the Westfield area when surface water flooding
affected roads. The most recent flood was recorded on 5 December 2015 from
Storm Desmond which caused some flooding of gardens in the area.
Selected Actions in the Luncarty Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD STUDY (Ref: 24701)
Objective (ID): Reduce the risk of river flooding in Luncarty (Ref: 2473)
Delivery Lead: Perth & Kinross Council

Page 88

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 87 
Return to Contents Page
Status: Not started Planned Delivery Period: 2024-2026
Description:
Perth and Kinross Council will progress a flood study to look at
river flood risk in Luncarty. The flood risk from the River Tay, the
Shochie Burn and the Ordie Burn will be assessed. The impacts
of climate change on flood risk will be evaluated. The study will
include flood modelling, and if flood risk is confirmed, an appraisal
of potential future actions to manage flood risk and scoping of
future work will be carried out. 
Coordination
Arrangement:
The study is programmed to commence in the 2024/25 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the fluvial flood risk and identify potential options for
managing that risk.
The study will be coordinated through the Local Plan District
Partnership and with other related actions. 
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 24702)
Objective (ID): Prepare for future flooding as a result of climate change in
Luncarty (Ref: 2472)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in this
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with ongoing projects and activities. This will include
engaging with the community on the development of the flood
study.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Local Plan District
Partnership. Information will be disseminated through website,
social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 24703)
Objective (ID): Prepare for future flooding as a result of climate change in
Luncarty (Ref: 2472)
Delivery Lead: Scottish Water
Status: Planned Planned Delivery Period: 2025-2027

Page 89

Tay Local Flood Risk Management Plan 
PVA 02/08/10 Luncarty | 88 
Return to Contents Page
Description:
Scottish Water will undertake a modelling assessment in the Perth
City sewer catchment to improve knowledge and understanding of
flood risk in this area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Scottish Water will coordinate this action with Perth and Kinross
Council and SEPA. Outputs of this modelling assessment will be
shared with Perth and Kinross Council and SEPA
Funding
Arrangement:
Funding for this action is secured within Scottish Water's business
plan.

Page 90

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 89 
Return to Contents Page
3.11 Scone - PVA 02/08/11 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council Annaty Burn (River Tay) 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Scone.
The main source of flooding is the Annaty Burn and surface water. There is a history
of flooding in this area, with recent floods caused by both river and surface water
flooding. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This is identified below. Further information on the objectives
and actions to manage flood risk within this area is provided below. 
Scone   Target Area 255

Page 91

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 90 
Return to Contents Page 
Scone (Objective Target Area 255) 
Summary Location Map
Scone is a town northeast of Perth
located within Perth and Kinross. 
The main source of flooding is surface
water and river flooding from the
Annaty Burn. There are approximately
330 people and 180 homes and
businesses currently at risk from
flooding. This is likely to increase to
400 people and 220 homes and
businesses by the 2080s due to
climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by a previous
flood study for the Annaty Burn, while the national understanding of surface water
flooding was improved by Scottish Water’s sewer flood risk assessment.
There has been a history of flooding in this area. In August 2004 high intensity
rainfall resulted in flooding to a number of properties and the Annaty Burn
overtopped. A series of small-scale localised floods in Scone were recorded in 2010,
2013 and 2014. In May 2017, heavy rainfall led to several roads in the area being
flooded. Heavy rain on 11 and 12 August 2020 led to surface water flood water
outside some properties to rise up to the level of airbricks. The most recent flood was
recorded February 2021 when multiple areas across Perth and Kinross were
affected, including Scone. 
Objectives and Actions in the Scone Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 92

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 91 
Return to Contents Page 
Action (ID): FLOOD PROTECTION SCHEME (Ref: 25501)
Objective (ID): Reduce the risk of surface water and river flooding from the
Annaty Burn in Scone (Ref: 2554)
Delivery Lead: Perth & Kinross Council
Status: Not started Planned Delivery Period: To be confirmed
Description:
A flood protection scheme has been proposed to address the risk
of river flooding to the Goshenbank Park and Burnside area in
Scone from the Annaty Burn. The preferred option consists of
raising existing footbridges and constructing riverside defences.
The scheme would provide a 1 in 200-year standard of flood
protection. 
The commencement of the work to develop the scheme has been
delayed. The development of the proposals will be informed by
community engagement. The scheme will then progress to the
statutory process set out under the Flood Risk Management
(Scotland) Act 2009. The detailed design will be completed
thereafter. 
Following completion of the detailed design, the proposed scheme
will be procured and will progress to construction. 
As built drawings will be made available to SEPA, for inclusion in
the Scottish Flood Defence Asset Database, flood map updates
and flood warning scheme updates.
Coordination
Arrangement:
The Scone (Annaty Burn) Flood Protection Scheme will be
coordinated through the Tay Local Plan District Partnership. The
flood protection scheme will be coordinated with other related
actions.
Funding
Arrangement:
The delivery of the Annaty Burn Flood Protection Scheme is
subject to capital funding being made available (up to 80% capital
grant funding from the Scottish Government with the remaining
funding being provided from Perth & Kinross Council's capital
programme). 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 25502)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of Scone (Annaty Burn) Flood Protection
Scheme (Ref: 2552)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: To be confirmed
Description:
Once built, Perth and Kinross Council will implement an inspection
and maintenance regime for the Scone (Annaty Burn) Flood
Protection Scheme.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership will
maintain any existing flood protection scheme through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,

Page 93

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 92 
Return to Contents Page
landowners and other stakeholders as required. The maintenance
of the flood scheme will also be coordinated with related actions.
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth and Kinross Council revenue budget. 
Action (ID): FLOOD STUDY (Ref: 25503)
Objective (ID): Reduce the risk of surface water and river flooding from
the Annaty Burn in Scone (Ref: 2554)
Delivery Lead: Perth and Kinross Council
Status: Not Started Planned Delivery Period: 2023 - 2024
Description:
A flood protection study was carried out by Perth and Kinross
Council for the Annaty Burn, Scone in 2007. The study identified a
viable flood protection scheme as a priority in the first flood risk
management cycle. Further study was recommended to
supplement the previous investigations, looking at natural flood
management and surface water flooding. Natural flood
management options that should be considered include river/
floodplain restoration and sediment management. The study will
also investigate the viability of property level protection. The study
will take a catchment approach and consider the potential benefits
and disbenefits and interaction between actions upstream and
downstream. 
Perth and Kinross Council also carried out a flood protection study
for the barrel drain in Scone in 2007 which did not identify a viable
flood protection scheme. However, the Perth and Kinross Council
intends to re-examine this previous study following a small number
of drain failures and this will be carried out in conjunction with the
study identified above
Coordination
Arrangement:
The study is scheduled to commence in the 2022/23 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the flood risk and identify potential options for
managing that risk. This action will be undertaken in conjunction
with the Scone surface water management plan (Action Ref
25504).
The study will be coordinated through the Tay Local Plan District
Partnership.
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 25504)
Objective(ID): Reduce the risk of surface water and river flooding from
the Annaty Burn in Scone (Ref: 2554).
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023 - 2024
Description: Perth & Kinross Council will engage consulting engineers to
develop a surface water management plan for Scone. This will

Page 94

Tay Local Flood Risk Management Plan 
PVA 02/08/11 Scone | 93 
Return to Contents Page
investigate the surface water flood risk and identify potential
options for managing that risk.
The surface water management plan will be delivered as part of
the Scone Flood Study (Action Ref 25503). 
Scottish Water will provide local knowledge and understanding of
the sewer network. This includes Scottish Water corporate data
(as applicable) and, where available, outputs of Section 16 or
integrated catchment studies, to assist with the surface water
management planning process.
Coordination
Arrangement:
The surface water management plan is scheduled to commence in
the 2022/23 financial year and will be coordinated through the Tay
Local Plan District Partnership.
Scottish Water will support surface water management planning
through ensuring that best available knowledge and data is used
to input into the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID):  COMMUNITY ENGAGEMENT (Ref: 25505)
Objective (ID): Prepare for current flood risk and future flooding in Scone as a
result of climate change (Ref: 2553)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with on-going projects and activities. 
Perth and Kinross Council will continue to coordinate with Scone
Community Council and local landowners on a priority needs basis
where resources allow. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure.

Page 95

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 94 
Return to Contents Page
3.12 Perth & Almondbank - PVA 02/08/12 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council River Tay 
Background 
This area is designated as a potentially vulnerable area due to flood risk to
Almondbank, Methven and Perth. The main source of flooding in Almondbank and
Methven is river flooding. The main sources of flooding in Perth are small
watercourses and surface water. Perth and Almondbank benefit from flood protection
schemes. There is a long history of flooding in these areas, with recent flooding from
surface water and small watercourses recorded in August 2020.   
List of Objective Target Areas 
There are three target areas in this potentially vulnerable area, which have been the
focus of further assessment, these are listed below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Almondbank   Target Area 187
Methven   Target Area 249
Perth    Target Area 253

Page 96

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 95 
Return to Contents Page 
Almondbank (Objective Target Area 187) 
Summary Location Map
Almondbank is located approximately
5km northwest of Perth on the banks
of the River Almond within Perth and
Kinross. 
The main source of flooding in
Almondbank is river flooding. The
recent Almondbank Flood Protection
Scheme protects approximately 31
homes and 48 businesses on the
River Almond and the East Pow Burn
up to the 1 in 200-year flood. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is improved by previous flood
study work for the Almondbank Flood Protection Scheme.
There is a long record of flooding in this area. Previous significant flooding occurred
in January 1993, September and December 1999 and January 2011. The most
recent flood was recorded in December 2015 due to Storm Desmond when the River
Almond overflowed causing erosion to the riverbank. The Almondbank Flood
Protection Scheme was substantially completed in 2018 and protects homes and
businesses from flooding in the area. In August 2020, some minor surface water
flooding was recorded at the Lochty Industrial Estate. In September 2022, heavy
rainfall resulted in the River Almond flooding onto the adjacent football pitch,
affecting the road access to the bowling club. No properties were affected. 
Objectives and Actions in the Almondbank Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 97

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 96 
Return to Contents Page 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 18701)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of Almondbank and Perth flood protection
schemes (Ref: 1872)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the Almondbank Flood Protection Scheme on the
River Almond and East Pow Burn will continue in accordance with
the existing inspection and maintenance regime
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes through a programme
of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's Revenue Budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 18702)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Almondbank (Ref: 1873)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
SEPA will maintain the Almond flood warning scheme.
Coordination
Arrangement:
SEPA will maintain the Almond flood warning service. SEPA will
continue to raise awareness of flood warning, and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.

Page 98

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 97 
Return to Contents Page
Methven (Objective Target Area 249) 
Summary Location Map
Methven is a village which lies due
west of Perth within Perth and
Kinross. 
The main source of flooding in
Methven is river flooding, with some
risk from surface water flooding. There
are approximately 50 homes and
businesses currently at risk of
flooding. This is likely to increase to
60 homes and businesses by 2080
due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources, and this information has highlighted the risk of flooding in this area.
There are records of flooding in this area. Flooding occurred in January and July
2002, July 2005, July 2010 and November 2012. In August 2020 when heavy rain led
to flooding of approximately 4 properties and roads. The most recent flooding
occurred in September 2022 when two properties are understood to have flooded. 
Objectives and Actions in the Methven Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3. 
Action (ID): FLOOD STUDY (Ref: 24901)
Objective (ID): Reduce the risk of river flooding from the Methven Burn in
Methven (Ref: 2493).
Delivery Lead: Perth & Kinross Council
Status: Not started Planned Delivery Period: 2026-2028

Page 99

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 98 
Return to Contents Page
Description:
A flood study is required to improve understanding of river
flood risk. The study will include flood modelling. If flood risk
is confirmed, potential options to manage flood risk should be
investigated. Current and long-term flood risk will be
considered and include the assessment of the potential
impacts of climate change.
Coordination
Arrangement:
The study is programmed to commence in the 2026/27
financial year. Perth and Kinross Council will engage a
consulting engineer to investigate the fluvial flood risk and
identify potential options for managing that risk.
The study will be coordinated through the Tay Local Plan
District Partnership and with other related actions.
Funding
Arrangement:
The flood study will be subject to funding from Perth and
Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 24902)
Objective (ID): Prepare for current flood risk and/or future flooding as a result
of climate change in Methven (Ref: 2492)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise
awareness of flood risk. Community engagement activity will
continue in connection with on-going projects and activities.
This will include engaging with the community on the
development of the flood study.
Coordination
Arrangement:
Community engagement will take place around any projects
and activities and will be coordinated through the Tay Local
Plan District Partnership. Information will be disseminated
through website, social media and other community
engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding
from Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by the Scottish
Government through SEPA’s grant in aid settlement. 
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure.

Page 100

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 99 
Return to Contents Page
Perth (Objective Target Area 253) 
Summary Location Map
The city of Perth is located on the
River Tay within Perth and Kinross.
The main source of flooding in Perth is
river flooding, however there is also a
risk from surface water. It should be
noted that Perth Flood Protection
Scheme reduces the risk of river and
coastal flooding in Perth. There are
approximately 4,000 people and 2,600
homes and businesses currently at
risk of flooding. This is likely to
increase to 9,300 people and 5,500
homes and businesses by the 2080s
due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding is improved by previous flood
studies carried out by the local authority for the Perth Flood Protection Scheme and
the on-going Craigie Burn flood study and Perth surface water management plan.
Understanding of sewer, river and surface water flooding was also improved as a
result of the Perth integrated catchment study which assessed the interactions
between the different flood sources.
There is a long record of flooding in this area, and most recently from surface water.
Significant damage occurred in 1993 when widespread flooding resulted in damage
to communication networks, hundreds of properties and farmland in and around
Perth, causing an estimated £20 million of damage. Residents were evacuated in the
North Muirton housing estate after flood defences were breached. Numerous surface
water floods were recorded in the area too, including on 21 July 2010 when
extensive surface water flooding around Perth affected properties and roads and 16
July 2011 when heavy rain caused surface water flooding in Perth. Homes and
businesses were affected. In June 2017 drains overflowed as a result of heavy
rainfall, flooding properties and several gardens and roads. Recently, on 11 and 12
August 2020 heavy rainfall caused widespread flooding in Perth flooding
approximately 155 homes and businesses across the city. In September 2022

Page 101

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 100 
Return to Contents Page
flooding occurred throughout Perth and Kinross, with approximately 40 properties
were flooded in Perth. 
Objectives and Actions in the Perth Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.
Action (ID): FLOOD PROTECTION WORKS (Ref: 25301)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: To be confirmed
Description:
The design of the proposed Bridgend surface water flood
protection works has commenced. The proposed works include a
high-capacity drainage channel and outfall to the River Tay. 
Following completion of the design, the Bridgend surface water
flood protection works will be procured and constructed. As built
drawings will be made available to SEPA, for inclusion in the
Scottish Flood Defence Asset Database, flood map updates and
flood warning scheme updates. 
In accordance with the Tay flood risk management plan, as part
of the scheme or works, Perth and Kinross Council will aim to
ensure the action will not have an adverse effect on the integrity
of the River Tay Special Area of Conservation.
Coordination
Arrangement:
The Bridgend surface water flood protection works will be
coordinated through the Tay Local Plan District Partnership,
taking cognisance of the on-going Perth surface water
management plan.
Funding
Arrangement:
The delivery of the Bridged Flood Protection Works is subject to
capital funding being made available (up to 80% capital grant
funding from the Scottish Government with the remaining funding
being provided from Perth & Kinross Council's capital
programme). 
Action (ID): FLOOD STUDY (Ref: 25302)
Objective (ID): Reduce the risk of river flooding from the Craigie Burn in Perth
(Ref: 2534)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: 2021 - 2023
Description:
Perth and Kinross Council has engaged consulting engineers to
complete the Craigie Burn Flood Protection Study as set out in
the Cycle 1 Tay local flood risk management plan.

Page 102

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 101 
Return to Contents Page
Coordination
Arrangement:
The flood study commenced in November 2021 and is on-going.
The consulting engineers are investigating the fluvial flood risk
and the potential actions required to manage and, where
achievable, to reduce that risk. The study is being coordinated
through the Tay Local Plan District Partnership and with the on-
going Perth surface water management plan.
Funding
Arrangement:
The flood study is being funded from Perth and Kinross Council’s
revenue budget. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 25303)
Objective (ID): Reduce the risk of surface water flooding in Perth. (Ref: 2535)
Delivery Lead: Scottish Water
Status: Not started Planned Delivery Period: 2025 - 2027
Description:
Scottish Water will undertake a modelling assessment in the
Perth City sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
The outputs of the modelling assessment will be shared with
Perth and Kinross Council and SEPA.
Funding
Arrangement:
Funding for this action is secured within Scottish Water's
business plan. 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 25304)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: 2021 - 2023
Description:
Perth and Kinross Council has engaged consulting engineers to
develop the Perth Surface Water Management Plan. They are
further investigating the surface water flood risk across Perth to
identify potential options for managing that risk. The results of
Scottish Water’s sewer flood risk assessment and the Perth
Integrated Catchment Study are being considered. Current and
long-term flood risk is being considered and if climate change
impacts are found to be significant, then an adaptation plan will
be included. Perth is a Scottish Water priority area and
opportunities to work jointly will be explored.
Coordination
Arrangement:
Development of the surface water management plan commenced
in December 2021 and is on-going, and is being coordinated
through the Tay Local Plan District Partnership.
This is a priority area for Scottish Water, who are working with
and supporting surface water management planning through
ensuring that best available knowledge and data is used to input
into the surface water management plan.
Funding
Arrangement:
The surface water management plan is being funded from Perth
and Kinross Council’s revenue budget.

Page 103

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 102 
Return to Contents Page 
Action (ID): FLOOD STUDY (Ref: 25305)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Scottish Water in coordination with Perth and Kinross Council
Status: Existing Planned Delivery Period: 2020 - 2023
Description:
The Perth Integrated Catchment Study identified a number of
flooding hotspots in Perth. These areas include Feus Road,
Cavendish Avenue, Marshall Place, South Street and Bells
Sports Centre. Scottish Water and Perth and Kinross Council will
continue to progress study work to identify options to manage
flood risk in the future.
The study will outline potential solutions and phasing of solutions
to reduce flood risk from the sewer network and surface water in
the Cavendish Avenue/Gray Street area of Perth. The remaining
study outputs will be assessed by all parties to identify whether
any works will be economically viable and affordable to be taken
forwards. Due to the cost of the and scale of options, it is likely
that any viable improvements would be delivered in a phased
manner over a number of FRM cycles.
Coordination
Arrangement:
The study has commenced and is expected to be completed in
2023. The results from the Feus Road elements of the study were
disseminated to the local community in November 2022. Other
areas will follow.
Scottish Water will continue to work with Perth and Kinross
Council to investigate the sewer and pluvial flood risk in the noted
high priority areas and identify potential options for managing that
risk. The study is being coordinated through the Tay Local Plan
District Partnership.
Funding
Arrangement:
The study is being funded from Perth and Kinross Council’s
revenue budget.
Funding for this action is secured within Scottish Water's
business plan. 
Funding for any potential future phases of work is not confirmed. 
Action (ID): FLOOD STUDY (Ref: 25306)
Objective (ID): Reduce the risk of surface water flooding in Perth (Ref: 2535)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023 - 2024
Description:
The Perth Integrated Catchment Study identified a number of
flooding hotspots in Perth. The highest priority areas are currently
being studied under a joint project run by Scottish Water in
partnership with Perth and Kinross Council (Action Ref: 25305).
Scottish Water and Perth and Kinross Council should progress
further study work for the remaining hotspots to identify options to
manage flood risk in the future.

Page 104

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 103 
Return to Contents Page
Coordination
Arrangement:
The study is programmed to commence in 2023. Perth and
Kinross Council will engage a consulting engineer to investigate
the surface water flood risk and identify potential options for
managing that risk. The study will be coordinated with Scottish
Water through the Tay Local Plan District Partnership and with
the on-going Perth Surface Water Management Plan (Action Ref:
25304). 
This is a priority area for Scottish Water, who will work with and
support the Council through ensuring that best available
knowledge and data is used to input into the study.
Funding
Arrangement:
The study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 25307)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in the area
by SEPA and the responsible authorities to raise awareness of
flood risk. Community engagement activity will continue in
connection with on-going projects and activities. 
Perth and Kinross Council will continue to coordinate with the
Local Resilience Partnership’s Community and Business
Resilience Group and other community resilience groups on a
priority needs basis where resources allow.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUPS (Ref: 25308)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going

Page 105

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 104 
Return to Contents Page
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Perth Community and Business Resilience Group and the
South Inch Flood Group are active in this area. Perth and Kinross
Council will continue to communicate and support these groups
on flood risk matters. Their resilience plans should be reviewed
and updated regularly by the groups, and this will be supported
by the Council.
Coordination
Arrangement:
Perth and Kinross Council will continue to coordinate with the
Perth Business Community Resilience Group and the South Inch
Flood Group to manage flood risk, improve preparedness and
increase resilience against flooding. The Council will continue to
co-ordinate with these groups on a priority needs basis where
resources allow.
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 25309)
Objective(ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of the Perth Flood Protection Scheme (Ref:
2532)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the Perth Flood Protection Scheme on the River
Tay and the Craigie Burn should continue in accordance with the
existing inspection and maintenance regime.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership will
maintain any existing flood protection scheme through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 25310)
Objective(ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
SEPA should maintain the Almond flood warning scheme.

Page 106

Tay Local Flood Risk Management Plan 
PVA 02/08/12 Perth & Almondbank | 105 
Return to Contents Page 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 25311)
Objective(ID): Prepare for current flood risk and future flooding as a result of
climate change in Perth (Ref: 2533)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
SEPA should maintain the River Tay flood warning scheme.
Coordination
Arrangement:
SEPA will maintain the River Tay flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement. 
Coordination
Arrangement:
SEPA will maintain the River Almond flood warning scheme. SEPA
will continue to raise awareness of flood warning and engage with
communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.

Page 107

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 106 
Return to Contents Page
3.13 Comrie - PVA 02/08/13 
Local Plan District Local authority Main catchment
Tay Perth and Kinross Council,
Stirling Council River Earn 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Comrie.
The main source of flooding is the River Earn, River Lednock and the Water of
Ruchill. There is also risk of flooding from surface water. There is a history of
flooding with significant floods recorded in 2015 and 2016 during Storm Frank. 
List of Objective Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This area is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Comrie  Target Area 213

Page 108

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 107 
Return to Contents Page 
Comrie (Objective Target Area 213) 
Summary Location Map
Comrie is located to the east of Loch
Earn within Perth and Kinross. 
The main source of flooding in Comrie
is river flooding from the Water of
Ruchill, the River Earn and the River
Lednock. There is also risk of surface
water flooding. The local authority has
carried out a flood study in this area
which estimated that there are
approximately 191 homes and 2
businesses currently at risk from
flooding. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk 
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river flooding was improved by the studies
supporting the on-going development of the proposed Comrie Flood Protection
Scheme. The national understanding of surface water flooding was also improved by
Scottish Water’s sewer flood risk assessment.
There is a long record of flooding in this area. In August 2012, approximately 60
properties in Dalginross were flooded by the Water of Ruchill. In November 2012 the
Water of Ruchill flooded again, inundating approximately 150 homes. In January
2016 the fire service was called to attend a localised flooding issue. The most recent
flood occurred in February 2021 however no properties were affected. 
Objectives and Actions in the Comrie Objective Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 109

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 108 
Return to Contents Page
Action (ID): FLOOD PROTECTION SCHEME (Ref: 21301)
Objective(ID): Reduce the risk of river flooding from the River Earn, River
Lednock and the Water of Ruchill in Comrie (Ref: 2134)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: 2022 - 2024
Description:
The Comrie Flood Protection Scheme was confirmed under the
Flood Risk Management (Scotland) Act on 18 August 2021. The
detailed design of the flood scheme  is on-going and once
complete, the flood scheme is to be built.
Advance works commenced in August 2022 and are on-going.
The detailed design of the flood scheme is to be completed,
followed by procurement and construction. The development of
the proposals will continue to be informed by community
engagement. 
Once complete, as built drawings will be made available to
SEPA, for inclusion in the Scottish Flood Defence Asset
Database, flood map updates and flood warning scheme updates.
Coordination
Arrangement:
The Comrie Flood Protection Scheme is being coordinated
through the Tay Local Plan District Partnership. SEPA will work
with Perth and Kinross Council on the potential to coordinate this
action with an update to SFDAD and flood warning actions.
Funding
Arrangement:
The Comrie Flood Protection Scheme will be subject to available
capital funding (up to 80% capital grant funding from the Scottish
Government with the remaining funding being provided from Perth
& Kinross Council's capital programme). 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 21302)
Objective (ID): Reduce the risk of surface water flooding in Comrie (Ref: 2133)
Delivery Lead: Scottish Water
Status: Not started Planned Delivery Period: 2025 - 2027
Description:
Scottish Water will undertake a modelling assessment in the
Comrie sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Outputs of this modelling assessment will be shared with local
authorities and SEPA.
Funding
Arrangement:
Funding for this action is secured within Scottish Water's business
plan. 
Action (ID): SURFACE WATER MANAGEMENT PLAN (Ref: 21303)
Objective (ID): Reduce the risk of surface water flooding in Comrie (Ref: 2135)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023 - 2025

Page 110

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 109 
Return to Contents Page
Description:
Perth & Kinross Council will engage consulting engineers to
develop a surface water management plan for Comrie. This will
investigate the surface water flood risk and identify potential
options for managing that risk. The results of the sewer flood risk
assessment will be considered. Current and long-term flood risk
will be assessed and if climate change impacts are found to be
significant, surface water management should include adaptive
planning.
Coordination
Arrangement:
The surface water management plan is programmed to
commence in the 2023/24 financial year and will be coordinated
through the Tay Local Plan District Partnership. 
Scottish Water support surface water management planning
through ensuring that best available knowledge and data is used
to input to the surface water management plan.
Funding
Arrangement:
The surface water management plan will be subject to funding
from Perth and Kinross Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 21304)
Objective (ID): Prepare for current flood risk and/or future flooding as a result of
climate change in Comrie (Ref: 2133)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement is to continue to be carried out in the
area by SEPA and the responsible authorities to raise awareness
of flood risk. Community engagement activity will continue in
connection with on-going projects and activities. 
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Perth and Kinross Council will continue to coordinate with the
Comrie Community Resilience Group on a priority needs basis
where resources allow.
Funding
Arrangement:
Community engagement activities will be subject to funding from
Perth and Kinross Council’s revenue budget.
SEPA's role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement. 
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): COMMUNITY RESILIENCE GROUP (Ref: 21305)
Objective (ID): Prepare for current flood risk and/or future flooding as a result of
climate change in Comrie (Ref: 2133)
Delivery Lead: Community
Status: Existing Planned Delivery Period: On-going

Page 111

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 110 
Return to Contents Page
Description:
The group of community volunteers work to prepare and put in
practice their Community Resilience Plan and be supported by
the local authority.
The Comrie Community Resilience Group operates in this area.
Perth and Kinross Council will continue to communicate and
support the group on flood risk matters. The resilience plan
should be reviewed and updated regularly by the group, and this
will be supported by the Council.
Coordination
Arrangement:
Perth and Kinross Council will continue to coordinate with the
Comrie Community Resilience Group to manage flood risk,
improve preparedness and increase resilience against flooding.
The Council will continue to co-ordinate with the group on a
priority needs basis where resources allow. 
Funding
Arrangement:
Funding for Community flood action groups will be provided by
private individuals, businesses, organisations or communities at
risk of flooding. 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 21306)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of the flood protection scheme in Comrie (Ref:
2132)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Perth and Kinross Council will continue to maintain existing flood
defences and flood protection works in Comrie in accordance with
the existing inspection and maintenance regime. These include
the Water of Ruchill Flood Protection Scheme constructed in the
1960s and flood protection works carried out in 2013. 
Once built, Perth and Kinross Council will implement an
inspection and maintenance regime for the Comrie Flood
Protection Scheme
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes and works through a
programme of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required. 
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's revenue budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 21307)
Objective (ID): Prepare for current flood risk and/or future flooding as a result of
climate change in Comrie (Ref: 2133)
Delivery Lead: SEPA
Status: Existing Planned Delivery Period: On-going

Page 112

Tay Local Flood Risk Management Plan 
PVA 02/08/13 Comrie | 111 
Return to Contents Page
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required.
SEPA should maintain the Comrie flood warning scheme.
Coordination
Arrangement:
SEPA will work with Perth & Kinross Council on the potential to
use information from the Comrie flood scheme to inform on-going
flood warning. SEPA will continue to raise awareness of flood
warning and engage with communities about the service when
required.
Funding
Arrangement:
SEPA’s role in this action is funded by the Scottish Government
through SEPA’s grant in aid settlement.

Page 113

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 112 
Return to Contents Page
3.14 Bridge of Earn - PVA 02/08/14 
Local Plan District Local Authority Main Catchment
Tay Perth and Kinross Council River Earn 
Background 
This area is designated as a potentially vulnerable area due to flood risk to Bridge of
Earn. The main source of flooding is river flooding from the River Earn, Deich Burn
and Yellow Burn. A flood protection scheme offers some protection against flooding
in this area. There is also risk of surface water flooding. There is history of flooding in
this area, with recent flooding recorded in 2015, 2016, and 2020. 
List of Target Areas 
There is one target area in this potentially vulnerable area, which has been the focus
of further assessment. This area is identified below. Further information on the
objectives and actions to manage flood risk within this area is provided below. 
Bridge of Earn  Target Area 205

Page 114

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 113 
Return to Contents Page 
Bridge of Earn (Objective Target Area 205) 
Summary Location Map
The town of Bridge of Earn is located
on the River Earn within Perth and
Kinross. 
The main source of flooding in Bridge
of Earn is river flooding, however
there is also a risk of surface water
flooding. There are approximately 290
people and 150 homes and
businesses at risk from flooding. This
is likely to increase to 340 people and
180 homes and businesses by the
2080s due to climate change. 
(© Crown copyright and database
rights 2022 OS 100016971) 
Current Understanding of Flood Risk   
This section provides a summary of information, which has helped to develop an
understanding of flood risk in the area. Since 2011 SEPA has developed and
updated national assessments of flooding from rivers, surface water and coastal
sources. The national assessment for river and surface water flooding was improved
by the Perth integrated catchment study which has assessed the interactions
between sewer, river and surface water flooding.
There is a long record of flooding in this area. The town was affected by flooding in
February 1990 and January 1993. In December 2015, Storm Desmond caused
prolonged rainfall across Perth & Kinross, affecting several properties in Bridge of
Earn. In June 2016 intense rainfall caused flooding to homes, roads and a local
school. In August 2020, heavy rain flooded one property and some roads. The most
recent flooding occurred in September 2022 when surface water flooding affected
four properties. 
Objectives and Actions in the Bridge of Earn Target Area 
The objectives and actions for this target area are set out in the tables below.
SEPA and responsible authorities also carry out actions in all areas to manage
current and future flood risk. A description of these actions is included in Section 2.3.

Page 115

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 114 
Return to Contents Page 
Action (ID): FLOOD STUDY (Ref: 20501)
Objective (ID): Reduce the risk of surface water flooding in Bridge of Earn (Ref:
2054)
Delivery Lead: Perth and Kinross Council
Status: Not started Planned Delivery Period: 2023-2025
Description:
A flood study will be carried out in order to better understand the
integrated flooding mechanisms in Bridge of Earn. The study will
initially include a high-level assessment of actions and then
consider the works required to reduce flood risk in the future. The
results of the recent Perth Integrated Catchment Study will be
incorporated. Current and long-term flood risk will be considered.
Coordination
Arrangement:
The study is programmed to commence in the 2023/24 financial
year. Perth and Kinross Council will engage a consulting engineer
to investigate the flood risk and identify potential options for
managing that risk.
The study will be coordinated through the Tay Local Plan District
Partnership.
Scottish Water will provide local knowledge and understanding of
the sewer network. This includes Scottish Water corporate data
(as applicable) and, where available, outputs of the Section 16
sewer assessment and/or Perth integrated catchment study.
Funding
Arrangement:
The flood study will be subject to funding from Perth and Kinross
Council’s revenue budget. 
Action (ID): COMMUNITY ENGAGEMENT (Ref: 20502)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Bridge of Earn (Ref: 2053)
Delivery Lead: SEPA and Responsible Authorities
Status: Existing Planned Delivery Period: On-going
Description:
Community engagement will continue to be carried out in the area
by SEPA and the responsible authorities to raise awareness of
flood risk. Community engagement will continue in connection
with any on-going projects and activities. 
Perth and Kinross Council will continue to coordinate with Bridge
of Earn Community Council and other groups on a priority needs
basis where resources allow.
Coordination
Arrangement:
Community engagement will take place around any projects and
activities and will be coordinated through the Tay Local Plan
District Partnership. Information will be disseminated through
website, social media and other community engagement activity.
Funding
Arrangement:
Community engagement activities will be subject to funding from
the Council’s revenue budget.
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by their
economic regulator, all business activities required under this

Page 116

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 115 
Return to Contents Page
action by Scottish Water are accounted for in their capital or
operational expenditure. 
Action (ID): SEWER FLOOD RISK ASSESSMENT (Ref: 20503)
Objective (ID): Reduce the risk of surface water flooding in Bridge of Earn (Ref:
2054)
Delivery Lead: Scottish Water
Status: Not started Planned Delivery Period: 2025-2027
Description:
Scottish Water will undertake a modelling assessment in the
Perth City sewer catchment to improve knowledge and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009.
Coordination
Arrangement:
Outputs of this modelling assessment will be shared with local
authorities and SEPA.
Funding
Arrangement:
Funding for this action is secured within Scottish Water's business
plan. 
Action (ID): MAINTAIN FLOOD PROTECTION SCHEME (Ref: 20504)
Objective (ID):
Avoid an increase in flood risk by the appropriate management
and maintenance of the Bridge of Earn Flood Protection Scheme
(Ref: 2052)
Delivery Lead: Perth and Kinross Council
Status: Existing Planned Delivery Period: On-going
Description:
Maintenance of the Bridge of Earn Flood Protection Scheme on
the River Earn, the Deich Burn and the Yellow Burn will continue
in accordance with the existing inspection and maintenance
regime.
Coordination
Arrangement:
Perth & Kinross Council's Roads Maintenance Partnership
maintain existing flood protection schemes through a programme
of inspections carried out in accordance with the
recommendations set out in the scheme maintenance manuals.
Maintenance works will be coordinated with SEPA, NatureScot,
landowners and other stakeholders as required.
Funding
Arrangement:
The maintenance of flood protection schemes will be subject to
funding from Perth & Kinross Council's Revenue Budget. 
Action (ID): FLOOD WARNING MAINTENANCE (Ref: 20505)
Objective (ID): Prepare for current flood risk and future flooding as a result of
climate change in Bridge of Earn (Ref: 2053)
Delivery Lead: SEPA
Status: Existing  Planned Delivery Period: On-going
Description:
The Floodline flood warning service is to be kept operational
through maintenance to the existing system and updates being
undertaken as required. 
SEPA will maintain the Earn flood warning scheme.

Page 117

Tay Local Flood Risk Management Plan 
PVA 02/08/14 Bridge of Earn | 116 
Return to Contents Page
Coordination
Arrangement:
SEPA will work with Perth and Kinross Council on the potential to
use information from the flood study to inform ongoing flood
warning. SEPA will continue to raise awareness of flood warning
and engage with communities about the service when required.
Funding
Arrangement:
SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.

Page 118

Tay Local Flood Risk Management Plan 
Chapter 3 | 117 
Return to Contents Page
3.15 Other Flood Risk Activities by Local Authorities in the Tay Local Plan
District 
This Local Flood Risk Management Plan presents the actions to manage flood risk in
the Tay Local Plan District. These actions are at a LPD-wide scale or are targeted at
specific Potentially Vulnerable Areas. In addition to the actions in this Plan,
responsible authorities are undertaking other activities to manage flood risk as
included in the Flood Risk Management (Scotland) Act 2009. The main activities that
have a significant effect and should be considered in conjunction with the Plan are
summarised as follows: 
Surface Water Management Planning 
As described in paragraph 1.8 of this Plan, surface water flooding occurs in areas of
the Tay Local Plan District. This will be addressed by Surface Water Management
Planning. Details of the Surface Water Management Planning for each local authority
in the Local Plan District are included in Annex 5 of this Plan. 
Section 18 & 59: Works of Clearance and Repair 
Based on an assessment of the condition of a body of water, local authorities must
prepare a schedule of clearance and repair works that would substantially reduce the
risk of flooding of land. This is commonly referred to as a Schedule 18, which is
made available by each local authority within the Local Plan District for public
inspection. Under Section 59 of the Flood Risk Management (Scotland) Act, a local
authority must carry out the works in the Schedule 18 if it considers that this will
contribute to (or will not affect) the implementation of actions in this Plan. Details of
how to access Schedule 18’s for each local authority in the Local Plan District are
included in Annex 5 of this Plan. 
Section 56: General Power to manage flood risk 
Without affecting the implementation of actions in this Plan, a local authority may do
anything which it considers will contribute to the implementation of actions in this
Plan or is necessary to reduce the risk of a flood which is likely to occur imminently
and have serious adverse consequences for human health, the environment, cultural
heritage or economic activity in its area. 
This may include carrying out flood protection works, which may not be identified as
actions in this Plan. Where a local authority has a commitment to carry out such
flood protection works or any other activities within the period of the current FRM
cycle not included as actions in this Plan, then these works are identified in Annex 5
of this Plan.

Page 119

Tay Local Flood Risk Management Plan 
Chapter 3 | 118 
Return to Contents Page 
3.16 Next Steps and Monitoring Progress 
This Plan will run for six years from 2022. Over this period the Tay Local Plan District
partnership will meet from time to time to monitor progress on implementing the
actions detailed in Section 3 of the Plan.
Between years two and three of the cycle (i.e. before December 2025), Perth and
Kinross Council, as lead local authority, will publish an interim report on the
conclusions of a review of the Plan, including information on the progress that has
been made towards delivering the actions identified in the Plan. 
Between years five and six of the cycle (i.e. before June 2028), Perth and Kinross
Council, as lead local authority. will publish a final report on the Plan containing an
assessment of the progress made towards delivering the “current actions”, a
summary of the actions not implemented, with reasons why, and a description of any
other actions undertaken since the plan was finalised, which the lead local authority
considers have contributed to the achievement of the objectives in the Plan. 
Perth and Kinross Council will make these reports available for public inspection.

Page 120

Tay Local Flood Risk Management Plan 
Annex 1 | 119 
Annex 1: Tay LPD Roles, Responsibilities & Contact Details
Roles and responsibilities for Flood Risk Management Planning 
Individuals are the first line of defence against flooding. However, public bodies have
responsibilities too and are working together to reduce the impacts of flooding in
Scotland. Responsibility for flood risk management planning falls in the main to
SEPA, local authorities and Scottish Water. However, individuals have a personal
responsibility to protect themselves and their property. 
Some of the key roles are outlined below and more information is available from the
SEPA website. 
Your Responsibilities 
Organisations and individuals have responsibilities to protect themselves from
flooding. Being prepared by knowing what to do and who to contact if flooding
happens can help you reduce the damage and disruption flooding can have on your
life. 
The first step to being prepared is signing up to Floodline so you can receive
messages to let you know where and when flooding is likely to happen. Other useful
tools and advice on how to be prepared are available on the Floodline website
including a quick guide to who to contact in the event of a flood. You can also check
how your area could be affected by flooding by looking at SEPA’s flood maps. 
SEPA 
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk
management authority. We have a statutory duty to produce Scotland's Flood Risk
Management Strategies. As described above, we work closely with other
organisations responsible for managing flood risk through a network of partnerships
and stakeholder groups to ensure that a nationally consistent approach to flood risk
management is adopted. 
SEPA also has a responsibility to identify where in Scotland there is the potential for
natural flood management techniques to be introduced. Natural flood management is
the use of the natural features of the land to store and slow down the flow of water.
In running Floodline, we provide live flooding information and advice on how to
prepare for or cope with the impacts of flooding 24 hours a day, seven days a week.
To help us forecast for flooding we work closely with the Met Office. 
To raise awareness of flooding at a national level SEPA runs education initiatives,
community engagement programmes and an annual campaign to promote the useful

Page 121

Tay Local Flood Risk Management Plan 
Annex 1 | 120 
advice and information available through Floodline. We work in partnership with local
authorities, Neighbourhood Watch Scotland, Ready Scotland and others to share our
resources and help to promote preparedness and understanding of how flood risk is
managed. 
SEPA can be contacted as follows:
Telephone: 03000 99 66 99
E-mail:  frmplanning@sepa.org 
Address: Strathallan House Castle Business Park Stirling, FK9 4TZ 
Local Authorities 
Local authorities work together for flood risk management planning purposes through
a single lead authority which has the responsibility for producing the Local Flood
Risk Management Plan. Local authorities have been working collaboratively in the
manner described above to develop these. 
It is the responsibility of your local authority to implement its flood protection actions
agreed within the Flood Risk Management Strategy, including new schemes or
works and the requirement to carry out clearance and repair works on bodies of
water. You can help your local authority to manage flooding by letting them know if
debris is blocking watercourses or if flood defences are tampered with.
During severe flooding, local authorities will work with the emergency services and
coordinate shelter for people evacuated from their homes.
The lead authority for the Tay Local Plan District is Perth & Kinross Council. Other
local authorities who are responsible authorities for the Tay Local Plan District are: 
• Angus Council;
• Fife Council;
• Stirling Council. 
Contact details are provided below. 
Local
Authority Telephone E-mail Address
Perth & Kinross
Council
01738 475000 Flood@pkc.gov.uk  Pullar House
35 Kinnoull Street
Perth PH1 5GD
Angus
Council
03452 777 778 Accesline@angus.gov.uk Orchardbank
Business Park, 
Orchardbank, 
Forfar, 
Angus DD8 1AX
Fife
Council
03451 550000 fife.council@fife.gov.uk Fife Council
Fife House,

Page 122

Tay Local Flood Risk Management Plan 
Annex 1 | 121 
North Street,
Glenrothes 
KY7 5LT
Stirling Council 01786 404040 http://my.stirling.gov.uk/contact 
(online form)
Flooding Team, 
Stirling Council, 
Endrick House, 
Kerse Road, 
Stirling FK7 7SZ 
Scottish Water 
Scottish Water is a responsible authority for flood risk management and is working
closely with SEPA, local authorities and others to coordinate plans to manage flood
risk. Scottish Water has the public drainage duty and is responsible for foul drainage
and the drainage of rainwater run-off from roofs and any paved ground surface from
the boundary of properties. Additionally, Scottish Water helps to protect homes from
flooding caused by sewers either overflowing or becoming blocked. Scottish Water is
not responsible for private pipework or guttering within the property boundary.
Scottish Water can be contacted on 0800 0778 778. 
National Parks 
The two National Park Authorities, Loch Lomond and Trossachs National Park and
Cairngorms National Park, are the Planning Authorities for their respective areas and
were designated as responsible authorities for flood risk management purposes in
2012. Both have worked with SEPA, local authorities and Scottish Water to help
develop Flood Risk Management Strategies and Local Flood Risk Management
Plans. As planning authorities they fulfil an important role in land use planning,
carrying out or granting permission for activities that can play a key role in managing
and reducing flood risk. The Loch Lomond and Trossachs National Park and the
Cairngorms National Park are responsible authorities with the Tay Local Plan
District. 
Contact details are provided below. 
National Park
Authority Telephone E-mail Address
Loch Lomond
& Trossachs
01389 722 600 info@lochlomond-trossachs.org  Carrochan, 
Carrochan Road,
Balloch, G83 8EG
Cairngorms 01479 873 535 planning@cairngorms.co.uk  14 The Square,
Grantown-on-Spey
PH26 3HG

Page 123

Tay Local Flood Risk Management Plan 
Annex 1 | 122 
Other organisations
• The Scottish Government oversees the implementation of the Flood Risk
Management (Scotland) Act 2009 which requires the production of Flood Risk
Management Strategies and Local Flood Risk Management Plans. Scottish
Ministers are responsible for setting the policy framework for how organisations
collectively manage flooding in Scotland. The Scottish Government has also
approved the Tay Flood Risk Management Strategy.
• Scottish Natural Heritage has provided general and local advice in the
development of the Flood Risk Management Strategies. Flooding is seen as a
natural process that can maintain the features of interest at many designated
sites, so Scottish Natural Heritage helps to ensure that any changes to patterns
of flooding do not adversely affect the environment. Scottish Natural Heritage
also provides advice on the impact of Flood Protection Schemes and other land
use development on designated sites and species.
• Forestry and Land Scotland was designated in 2012 as a responsible authority
for flood risk management planning purposes and has engaged in the
development of the Flood Risk Management Strategies through national and
local advisory groups. This reflects the widely held view that forestry can play a
significant role in managing flooding. Forestry and Land Scotland can be
contacted as follows:
Tel:  03000 676 005 
Address: Upper Battleby, Redgorton,Perth, PH1 3EN
• During the preparation of the first flood risk management plans, Network Rail
and Transport Scotland have undertaken works to address flooding at a
number of frequently flooded sites. Further engagement is planned with SEPA
and local authorities to identify areas of future work. There is the opportunity for
further works to be undertaken during the first flood risk management planning
cycle although locations for these works are yet to be confirmed.
• Utility companies have undertaken site specific flood risk studies for their
primary assets and have management plans in place to mitigate the effects of
flooding to their assets and minimise the impacts on customers.
• The Met Office provides a wide range of forecasts and weather warnings. SEPA
and the Met Office work together through the Scottish Flood Forecasting
Service.
• The emergency services provide emergency relief when flooding occurs and
can coordinate evacuations. You should call the emergency services on 999 if
you are concerned about your safety or the safety of others and act immediately
on any advice provided.
• Historic Environment Scotland considers flooding as part of their regular site
assessments. As such, flooding is considered as one of the many factors which

Page 124

Tay Local Flood Risk Management Plan 
Annex 1 | 123 
inform the development and delivery of its management and maintenance
programmes.
• The Scottish Flood Forum is a Scottish charitable organisation that provides
support for those who are affected by, or are at risk of, flooding. It provides flood
advice, information, awareness, education and training to individuals and
communities to help reduce the risk of flooding; in partnership with the local
authority, provides support during the recovery process following a flood incident
and aims to support the development of resilient communities. The Scottish
Flood Forum can be contacted as follows:
Tel:  01698 839 021
Web: www.scottishfloodforum.org
Address: Caledonian Exchange,19A Canning Street, Edinburgh, EH3 8HE

Page 125

Tay Local Flood Risk Management Plan 
Annex 2 | 124 
Annex 2: Consultation and Engagement
It is essential that any action taken on flooding is informed by the best available data.
The 2009 Act therefore required that the draft Flood Risk Management Plans and
corresponding supplementary parts of Local Flood Risk Management Plans be put to
public consultation. SEPA and the lead local authorities were required to coordinate
their consultation arrangements during the preparation of these documents.
The purpose of the consultation was to seek views from everyone including
individuals, businesses and interested community groups at risk of flooding as well
as organisations with an interest in how flood risk is managed and delivered. This
Annex contains a summary of the responses made in the Tay Local Plan District and
explains how SEPA took these into account in preparing the Tay Flood Risk
Management Plan and also how they have taken them into account in preparing this
Tay Local Flood Risk Management Plan. 
The public consultation was delivered through a phased approach. Phase 1 (which
included a series of characterisation reports) commenced on 21 December 2021.
Phase 2 (which added initial objectives, a short list of measures and implementation
arrangements) commenced on 30 July 2021. The consultation closed on 31 October
2021.
The consultation was a web-based exercise carried out jointly with SEPA and the
other responsible authorities. The Citizen Space web-based platform was used to
host the consultation. Consultation questions were developed to stimulate a
response and respondents were also given the opportunity to make comment.
In order to encourage appropriate participation in the public consultation, Perth &
Kinross Council placed public notices in newspapers circulating in the Tay District
and the Council wrote to the other Responsible Authorities, Category 1 Responders,
SEPA, NatureScot and the national park authorities. The Council also wrote to
community councils and advertised the consultation online and through social media.
The other responsible authorities in the Tay District also followed similar
arrangements.
28 respondents made specific comments on the public consultation for the Tay Local
Plan District as follows:
Respondent No of Responses
Members of the public 22
Local businesses 1
Community bodies 1
Other organisations 2
Elected members 1
Local authorities 1
Total 28

Page 126

Tay Local Flood Risk Management Plan 
Annex 2 | 125 
Three consultation responses were received from the statutory consultees:
• Perth & Kinross Council
• Elected members
• NatureScot
A summary of the specific responses received along with a summary of the changes
made to this Plan is provided below in Table A2.1. 
In general, the respondents made comment on the catchment characterisation,
objectives and selected actions as follows:-
• Some concerns were raised about on-going flooding of increasing frequency in
various areas – mainly in Perth – but these areas are within the designated PVAs
and OTA’s and objectives and actions have been set that will address them.
Some respondents noted concern that their area was outside of a PVA, but this
was due to lower flood risk and the general actions (as set out in Section 2.3 of
this Plan) will apply. Overall, this suggests that the majority of significant flooding
has been recorded in the characterisation reports.
• In general, there was agreement with the proposed objectives and actions
although some responses sought clarification on the timelines, or requested
accelerated timelines. Where possible, the timescales will be provided in the final
published Local Flood Risk Management Plan.
• Concerns were frequently raised around increased flood risk due to development,
but the LPD-wide land use planning action has been set to address this. Annex 3
of this local flood risk management plan also includes land use planning
objectives.
Any concerns raised are considered to have been addressed by the development of
SEPA’s Flood Risk Management Plan, the Council’s actions (flood studies, flood
schemes and on-going flood risk management responsibilities) or the final selected
actions. Therefore, no changes were required to the draft Tay Local Flood Risk
Management Plan. 
Table A2.1: Summary of Specific Issues Raised During Public Consultation 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1   Member of
the public 
Noted flooding in some
areas of Perth City and
Bridge of Earn; that package
of proposed objectives was
too vague; wanted to hear
more about maintenance,
river dredging, use of
The Tay Local FRM Plan
includes various actions for
both Perth and Bridge of Earn,
including flood studies and a
surface water management
plan. More detail on the
objectives and actions –

Page 127

Tay Local Flood Risk Management Plan 
Annex 2 | 126 
beavers, flooding of set
aside agricultural land, etc;
work should begin
immediately. 
including timescales - has
been provided in the final
published Plan. The Plan will
also include maintenance
actions.
2   Member of
the public 
A member of the public in
Perth is concerned that their
property has flooded
multiple times because of
heavy rain and blocked
drains. They are concerned
that this will happen again.  
The Tay Local FRM Plan
includes various actions to
manage the risk of flooding
including various flood studies,
a surface water management
plan and maintenance works.
Perth & Kinross Council’s
Roads Maintenance
Partnership carry out
maintenance of road drainage
systems. Road defects
(including blocked gullies) can
be reported to the Council via
their website.
3   Member of
the public 
A resident of Wallace
Crescent and Fairfield,
Perth expressed concern
that this area is not
mentioned, despite previous
repeated flooding of their
property. They are looking
for reassurance that this will
be considered. They
expressed concern about
development in the area, the
lack of upgrades or
improvements to the
existing drainage system
and the time required for
improvements. 
This area is located within the
Perth PVA (02/08/12) and OTA
253. The proposed Tay Local
FRM Plan includes specific
actions for the area that are
intended to bring about a
reduction in flood risk. These
actions include the on-going
Perth SWMP. Perth & Kinross
Council also invested in road
drainage improvements on
Wallace Crescent in 2021 to
reduce the risk of flooding.
4   Member of
the public 
A resident in Aberfeldy is
concerned about the visual
impact and access issues
associated with the proposal
to build a flood wall as part
of the Aberfeldy Flood
Scheme. 
The respondent noted
involvement in the local
community resilience plan
and in reporting blocked
street drains to the local
authority. 
The Tay Local FRM Plan
includes an action for a new
flood protection scheme in
Aberfeldy. Any issues
associated with visual impact
and access will be addressed
during the outline design of the
flood scheme via further public
consultation and the
Environmental Impact
Assessment.
In the meantime, the Council
welcomes local efforts to
improve flood resilience in
Aberfeldy.

Page 128

Tay Local Flood Risk Management Plan 
Annex 2 | 127 
5   Member of
the public 
A local resident who lives
next to the Craigie Burn in
Perth flooded last year and
expressed concern that
flooding has become more
frequent. They requested
quick action be taken by
pumping water away, noting
issues with surface water,
sewer flooding, issues with
flood gates, property
insurance costs, SUDS and
storage ponds. They have
taken steps to protect their
home and liaise with local
councillors. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253),
including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Plan also includes self-
help and awareness raising
actions.
It is individual property owners’
responsibility to protect
themselves and their assets
from flooding.
6   Member of
the public 
A resident in Craigie, Perth
noted concern that
development has increased
flood risk and that the
objective should include
infrastructure upgrades.
They noted that some
maintenance work has
helped matters but more
requires to be done. The
resident noted that they
have previously raised
issues, but they have not
been acted on, and
suggested a community
meeting. They also note that
they monitor flooding in the
Craigie area and have
reported this to the Council.
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253),
including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study, and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these
issues.
The proposed Plan also
includes other actions
including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences.
The Council welcomes local
efforts to improve flood
resilience in Perth.
7  Member of
the public 
A local resident in
Blairgowrie & Rattray noted
that localised flooding in
The Tay Local FRM Plan
includes maintenance of
watercourses. Perth & Kinross

Page 129

Tay Local Flood Risk Management Plan 
Annex 2 | 128 
rural Perthshire could be
mitigated in a cost-effective
way by improved ditch and
verge maintenance. The
resident noted the proposed
actions and timescales are
‘non-committal’ and won’t be
adhered to. They have
carried out their own verge
maintenance works.
Council’s Flooding team
inspect and assess bodies of
water and carry out clearance
and repair works, where this
will substantially reduce flood
risk. The primary responsibility
for avoiding or managing flood
risk remains with landowners.
Actions and timescales will be
set out in the published Plan
and interim and final reports
will also be published setting
out the progress made.
The Council welcomes local
efforts to improve flood
resilience in Blairgowrie &
Rattray.
8   Member of
the public 
A local resident in Alyth
noted two floods in 6 years
and expressed concern
about waiting until 2028 for
a plan to be made. They
noted the action taken by
the local community to
protect properties but noted
that the Council should do
more. They also noted the
need for more radical action
to prevent flooding by
creating an artificial flood
plain to the north of the
town.   
The Tay Local FRM Plan
includes a number of on-going
actions to manage flood risk in
Alyth.
In particular, Perth & Kinross
Council are currently
undertaking a Natural Flood
Management (NFM) Study in
Alyth. The study will explore
the potential options for flood
risk management measures in
this area, including NFM and
flood storage. 
9   Member of
the public 
A local resident in
Blairgowrie and Rattray
noted that the timescales for
actions are not quick
enough. 
The Tay Local FRM Plan will
set out the current timescales
for actions in Blairgowrie and
Rattray.  This area is currently
the focus of an on-going
surface water management
plan which will consider the
potential means of managing
and, where achievable,
reducing flood risk in this area. 
10  Member of
the public 
A member of the public in
Pitlochry agreed that the
main communities and
infrastructure had been
identified and with the 
No response required.

Page 130

Tay Local Flood Risk Management Plan 
Annex 2 | 129 
proposed objectives for this
area. 
11  Member of
the public 
A member of the public
noted that Dunning was not
listed in the consultation. 
Dunning was included within
PVA 08/16 in the Cycle 1 FRM
Plans, however, following the
2nd national flood risk
assessment in 2018, this area
has been re-assessed as
having a lower level of flood
risk. Dunning is therefore no
longer designated as a PVA.
However, the area is covered
by the proposed LPD-wide
actions set out in the Tay Local
FRM Plan. 
12  Member of
the public 
A member of the public in
Coupar Angus noted that: 
• flood risk is preventing
development and that
development elsewhere
has increased flood risk;
• watercourses are flowing
slower due to overgrown
vegetation and silt. 
• the A93 road should be
raised to prevent road
closures and delayed
emergency access due to
flooding.
• flood defences would
prevent flooding in Coupar
Angus but this would
move the problem
elsewhere. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area, including
the land use planning action.
All new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood risk
remains with landowners. 
The Council’s previous flood
study considered the potential
options for reducing flood risk
in Coupar Angus but
unfortunately did not identify
an economically viable flood
scheme. Flood risk will
therefore continue to be
managed as set out in the Tay
Local FRM Plan. 
13  Member of
the public 
A member of the public in
Perth noted:
• 8 flood events on the
Craigie Burn since 1981; 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253)

Page 131

Tay Local Flood Risk Management Plan 
Annex 2 | 130 
• concern about increased
flood risk due to
development and global
warming;
• the lack of scope for
improving existing flood
defences, e.g.
bottlenecks and culverts
in the Craigie Burn, and
the limited benefit of
maintenance works;
• that the pace of FRM is
too slow to keep pace
with the increased
frequency of flooding;
• that local residents need
to be kept informed of
any local works;
• the on-going risk to
property and people and
the associated costs; and
• it is the public authorities
job to manage flood risk.   
and in particular the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these issues
and the associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce flood
risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners. 
14  Member of
the public 
A member of the public in
Perth noted the increasing
frequency of flooding; the
increase in flood risk due to
development; the need to
improve drainage and not
rely on existing drainage or
watercourses such as the
Craigie Burn; the need for
improved communication on
actions being taken; that the
scale of the flooding over
the last 20 years has been
understated; that the
timescales for action are too
slow and that interim
changes are also required. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253)
and, in particular, the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these issues
and the associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary

Page 132

Tay Local Flood Risk Management Plan 
Annex 2 | 131 
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences. 
15  Member of
the public 
A local resident in Perth
noted:
• that flooding wasn’t
happening ‘once every
200 years’ – there had
been 8 flood events on
the Craigie Burn since
1981; 
• concern about increased
flood risk due to
development; 
• concern about how
SUDS operate and if
they deal with older
development;
• concern about flooding
on the Craigie Burn due
to small culverts and
blockages and the
impact on flooding of
adjacent properties;
• concern that dredging of
the Craigie Burn
increases flood risk
downstream;
• disappointment that
Perth & Kinross Council
appear to be blaming
householders for the
flooding, while allowing
development further
upstream;
• the damage done due to
surface water flooding;
and; 
• that action to manage
flood risk is too slow –
flooding is more frequent;
and
• that more communication
is required from the
Council.
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253)
and in particular the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these issues
and the associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all new
development is required to
comply with national and
local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce flood
risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners.

Page 133

Tay Local Flood Risk Management Plan 
Annex 2 | 132 
16  Member of
the public 
A local resident on the
Cavendish Avenue area of
Perth noted concern about
increasing flooding and
health impacts due to the
limited capacity of the sewer
system outside their
property and development
elsewhere in the catchment.
This has been an issue for
15-16 years, and they feel
that the sewer requires to be
upgraded. The resident
doesn’t feel able to act as
this may increase flood risk
to adjacent properties. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the Perth
PVA 02/08/12 and OTA 253).
In particular, there is an on-
going IFOS (Internal Flooding
due to Overloaded Sewers)
study being carried out jointly
between Scottish Water and
Perth and Kinross Council to
consider the potential means
of managing and, where
achievable, reducing flood risk
to properties in the vicinity of
Cavendish Avenue.
Community drop-in sessions
will be held early in 2023 to
disseminate the findings of this
study. 
17  Member of
the public 
A member of the public in
the Tomcroy Terrace area of
Pitlochry noted concern that
the flood map omits to show
the flood risk to their
neighbours property, which
has been affected twice by
an adjacent small burn and
surface water run off from
fields. They noted they may
be able to help the local
community resilience group.  
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Tomcroy Terrace is affected by
flooding from the Wester
Kinnaird Burn which was fully
considered by the more
detailed modelling work carried
out under the Pitlochry Flood
Study. The study
recommended a new
watercourse diversion channel
on the Wester Kinnaird Burn at
Tomcroy Terrace, as part of
the wider proposals for a flood
scheme in this area. The
proposed scheme is included
as one of the actions for this
area (the Pitlochry PVA
02/08/02 and OTA 254) in the
Tay Local FRM Plan.
The Council welcomes local
efforts to improve flood
resilience in Pitlochry.
18  Member of
the public 
A member of the public
noted concern about an
increase in flood risk due to
development.
The Tay Local FRM Plan
includes actions to manage
flood risk, including the land
use planning action. All new
development is required to
comply with national and local

Page 134

Tay Local Flood Risk Management Plan 
Annex 2 | 133 
planning policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
19  Member of
the public 
A member of the public in
Comrie agreed that the main
communities and
infrastructure had been
identified and agreed with
the proposed objectives for
this area.
No response required. 
20  Member of
the public 
A member of the public in
Bridge of Earn is concerned
that the Oudenarde and
Brickhall industrial sites are
not included within the
objective target area. They
noted concern about the
proposed objectives don’t
include tributaries to the
River Earn, and need to
address the flat topography
which limits surface water
drainage. They also noted
concern that the timescales
for actions were too long.   
The Tay Local FRM Plan
includes actions to manage
flood risk in Bridge of Earn
(PVA 02/08/14 and OTA 205). 
The development site at
Oudenarde and the Brickhall
Industrial site both fall outwith
OTA 205, although they are
within PVA 02/08/14. The flood
risk on these sites is being
managed through the land use
planning action which applies
across the whole of the local
plan district.
The proposed objectives do
not mention any watercourses
but instead refer to the
management of flood risk.
Flood risk from any bodies of
water and their tributaries will
therefore be considered. The
Deich and Yellow Burns have
been noted against the
‘Maintain flood protection
scheme’ action.
The Plan also includes a Flood
study to better understand the
integrated flooding
mechanisms in Bridge of Earn
(including surface water) and
the potential works required to
reduce flood risk in the future. 
The timescales for all of these
actions have been set out in
the published Plan.
21  Member of
the public 
A member of the public
noted that all vulnerable
areas should be identified,
and this should not be
The potentially vulnerable
areas (PVA’s) were set out in
the second national flood risk
assessment, published in

Page 135

Tay Local Flood Risk Management Plan 
Annex 2 | 134 
limited to affected houses,
but should also include
infrastructure. They note
that Forgandenny isn’t
included, despite previous
flooding, and that the flood
risk maps do not show
previous flooding. They
noted that support is
required from both Perth
and Kinross Council and
SEPA and noted concern
that current legislation does
not force rural landowners to
cooperate on natural flood
measures within their land.    
December 2018. This
assessment considered
homes, businesses and
infrastructure.
Forgandenny is not within one
of the areas designated as a
PVA in 2018. Even though
there has been previous
flooding, the level of flood risk
is not significant enough for
this area to be included within
a PVA.
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Notwithstanding the above,
actions have been set out in
the Tay Local FRM Plan to
manage flood risk across the
local plan district and these
apply to Forgandenny.
While current legislation does
not force rural landowners to
undertake flood measures on
their land, landowners remain
responsible for managing or
avoiding flood risk.
22  Member of
the public 
A member of the public in
Coupar Angus agreed that
the main communities and
infrastructure had been
identified and agreed with
the proposed package of
objectives.
No response required. 
23  Local
business 
A local business owner in
Aberfeldy noted that the
underlying causes of
flooding (the
mismanagement of the
moorlands in Highland
Perthshire) have not been
fully addressed. Work and
legislation should be
introduced immediately.
They noted that banning
grouse shooting, stopping
muir burning and moorland
ditchwork, and tree planting
would help.  
The Tay Local FRM Plan
includes actions to manage
flood risk in Aberfeldy (PVA
02/08/03 and OTA 183). This
area was fully considered by
the Aberfeldy Flood Study
which was completed in 2019.
The study considered a long
list of options (including land
management techniques) and
recommended a flood scheme
involving new flood defences in
the town. The study findings
were disseminated to the local
community via drop-in

Page 136

Tay Local Flood Risk Management Plan 
Annex 2 | 135 
sessions on 20 and 25 June
2019.  
24  Community
body 
Earn Community Council
agreed that the main
communities and
infrastructure had been
identified and agreed with
the proposed objectives,
actions and timescales for
the Bridge of Earn area. The
community council noted
that the local community can
help to limit surface water
runoff due to monoblocking/
surfacing of private land and
by implementing natural
flood management.   
Perth and Kinross Council
welcomes local efforts to
improve flood resilience in
Bridge of Earn. 
25  Other
organisation 
A group of 72 healthcare
professionals in Tayside and
North Fife issued an open
letter to Tayside and Fife
Councillors, in support of
climate mitigation for public
health. The group are
concerned that the
worsening climate crisis is a
public health emergency,
due to several factors
including worsening extreme
weather, such as heavy rain
and flooding. Creating green
and blue spaces can
provide health benefits;
adaptation is required to
cope with increased rainfall,
and the risk of flooding as
climate change worsens. 
The publication of the second
Tay Local FRM Plan is one of
the key actions to help us
adapt to climate change. As a
society, we need to take action
to manage the risk of flooding
and its impacts on our lives,
recognising that the risk can’t
ever be removed entirely. This
plan takes our knowledge and
understanding of flooding and
the impacts of climate change
and turns it into a set of actions
that are planned, prioritised
and co-ordinated to tackle
flooding in the communities
where it affects us the most. 
Flooding needs to be managed
sustainably so that flood risk is
reduced without moving the
problem elsewhere. It must be
done in a way that contributes
to the health and wellbeing of
communities, supports the
protection and regeneration of
the environment, improves
resilience to climate change
and enables a sustainable
economy. Actions are needed
on all sources of flooding –
including from rivers, the sea,
surface water and groundwater
– to meet the needs of present

Page 137

Tay Local Flood Risk Management Plan 
Annex 2 | 136 
and future generations while
also protecting and enhancing
the environment.
26  Other
organisation 
NatureScot noted that they
had previously contributed
to the 2018 NFRA
consultation and were in
general agreement with this
consultation. They provided
various detailed comments
on the proposed actions in
various OTA’s and the need
for an HRA to cover some of
these, due to on-going and
proposed actions within
Special Areas of
Conservation (SAC).
NatureScot also reiterated
that Natural Flood
Management (NFM) should
be used where possible to
reduce flood risk.  
NatureScot’s comments will
inform the various future
actions to be taken on flood
risk.
The Council has undertaken a
HRA as part of development of
the Tay Local FRM Plan and
has consulted with NatureScot
on this.  
NFM is considered in the
development of the Tay Local
FRM Plan and in the long list
of actions considered as part
of any individual flood studies. 
27  Elected
members 
Two of the Ward 10 elected
members (Councillors
Barrett & Wilson) in Perth &
Kinross Council noted
concern about various
flooding issues in Perth
including:
• Surface water flooding
from the M90 motorway
and the Broxden Park &
Ride facility;
• Operation of the flood
storage ponds at
Broxden;
• Maintenance of the
Scouring and Craigie
Burns;
• Arrangements for
developers completing
works and handing them
to the Council for
adoption;
• Flood gate closures on
the Perth Flood Scheme;
• River and surface water
flooding at various
locations.
The Tay Local FRM Plan on-
going includes actions to
manage flood risk in this area
(the Perth PVA 02/08/12 and
OTA 253); in particular, the
maintenance of the existing
Perth Flood Scheme, the
Craigie Burn Flood Study, the
Perth SWMP and the Perth
IFOS Project. 
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk. 
The Council also works with
developers to ensure that any
issues are fully addressed prior
to adoption. 
The primary responsibility for
avoiding or managing flood risk
remains with landowners.
A separate detailed response
was sent to the elected
members by e-mail on 25
January 2022.

Page 138

Tay Local Flood Risk Management Plan 
Annex 2 | 137 
28  Local
Authorities 
Perth & Kinross Council’s
flooding team made
comments specific to
various OTA’s; provided
updates for the prioritisation
of proposed Cycle 2 flood
schemes and flood
protection works; noted
concern over the lack of any
Scottish Water actions; and
suggested that Scottish
Foresty/Forestry & Land
Scotland should be
including objectives and
actions within the published
FRM Plans. No comment
was made by other services
within the Council.
N/A 
Perth and Kinross Council informed SEPA of any views expressed during the
consultation that were considered to be relevant to SEPA’s Flood Risk Management
Plan. SEPA subsequently published their consultation digest in March 2022 (which
can be viewed here) explaining how they took account of these views in preparing
the Flood Risk Management Plans.
The views and representations of the respondents were also taken into account in
developing and finalising this Local Flood Risk Management Plan.
The local authorities in the Tay District presented the findings from the public
consultation to their elected members as follows: 
Perth & Kinross Council
Perth and Kinross Council presented the findings of the consultation in a report to
their Climate Change and Sustainability Committee on 19 December 2022. The
committee report can be viewed here:
[link to be inserted]
Angus Council
Angus Council presented the findings of the consultation in a report to their
Environment Committee on [date to be advised]. The committee report can be
viewed here:
[link to be inserted]
Stirling Council

Page 139

Tay Local Flood Risk Management Plan 
Annex 2 | 138 
Stirling Council presented the outcome of the consultation initially to their committee.
The committee report can be viewed here:
[link to be inserted]
Fife Council
Fife Council presented the findings of the consultation to their elected members on
23 June 2015 as detailed here:
[link to be inserted] 
As noted at the start of this Annex, the public consultation closed on 31 October
2021 and there has not been any further formal communications or engagement in
relation to this Plan.

Page 140

Tay Local Flood Risk Management Plan 
Annex 3 | 139 
Annex 3: Land Use Planning 
Approach to Land Use Planning in the Tay Local Plan District 
Perth and Kinross Council is a local planning authority and will coordinate its work
with the strategic development planning authority and the National Parks Authorities,
who are also planning authorities. 
The Council’s Flooding Team are consulted on planning applications and work with
the Planning and Development Service to provide advice and ensure that flood risk
is addressed. The Perth & Kinross Local Development Plan (LDP2) provides the
framework against which planning applications outside the National Parks are
assessed and is consistent with the Strategic Development Plan (TAYplan). 
Supplementary Guidance on Flood Risk and Flood Risk Assessments is also
available to support the content of the Perth & Kinross Local Development Plan.
Planning applications within the National Parks are assessed against their respective
Local Development Plans, which also contain policies in relation to flood risk.
Planning applications are also reviewed against SEPA’s indicative flood maps,
existing flood studies and records of flooding. Where flood risk is an issue,
developers are required to prepare and submit a site-specific flood risk assessment
and drainage impact assessment as applicable. They must also consider how a
development site will be drained and how surface water runoff will be managed
through the implementation of appropriate Sustainable Urban Drainage Systems
(SuDS). 
The above referenced documents can be viewed at the links provided in Annex 5. 
The Scottish Planning Policy sets out a flood risk framework to guide development.
Areas of medium to high risk – where the annual probability of coastal or
watercourse flooding is greater than 0.5% (1:200 years) – may be suitable for
development provided flood protection measures to the appropriate standard (1:200
years) already exist and are maintained, are under construction, or are a planned
measure in a current flood risk management plan. This is a matter for careful
consideration through review of the Development Plan and its Strategic
Environmental Assessment. However, if the site is an important component of the
settlement strategy and no other equally suitable site is available then development
(apart from civic infrastructure and the most vulnerable uses) may be suitable. Any
development is such areas would also be subject to appropriate mitigation
measures: including water resistance, and water resilience measures and
evacuation procedures. 
So as to align the flood risk management and land use planning systems, land use
planning objectives and actions have been developed as shown below.

Page 141

Tay Local Flood Risk Management Plan 
Annex 3 | 140 
Flood Risk Management Actions From National Planning Policies 
The following objectives and actions reflect national Land Use Planning policies and
Guidance:- 
AVOID DEVELOPMENT IN MEDIUM TO HIGH RISK AREAS 
a) Planning authorities work in partnership undertaking catchment-wide Strategic
Flood Risk Assessments to inform their development plan allocations in line with
SEPA’s guidance and Land Use Vulnerability.
b) Planning authorities and SEPA require the submission of flood risk
assessments that accord with SEPA’s Technical Flood Risk Guidance for
Stakeholders, to support planning applications where there is a potential flood
risk. The flood risk assessment should be used to demonstrate as far as possible
that the development will be safe for its lifetime, without increasing flood risk
elsewhere and, where possible, takes opportunities to reduce flood risk overall.
c) SEPA ensures that its flood risk advice to planning authorities is clear and
appropriate. SEPA, in consultation with planning authorities, undertakes an
annual assessment of planning advice and its contribution to flood risk.
d) SEPA and planning authorities engage at an early stage of the development
plan process to agree appropriate forms of development to help inform the
preparation and implementation of Strategic Flood Risk Assessments. 
REDUCE IMPACTS TO EXISTING BUILDINGS 
a) SEPA, planning authorities and local communities are required to engage at
an early stage of the development plan process to agree the best long term land
uses for areas where relocation, abandonment and/or change of use have been
identified to deliver sustainable flood risk management. Where possible, new
land uses should aim to achieve multiple benefits for local communities such as
the creation of blue / green infrastructure and increased resilience to climate
change. 
PROTECT AND ENHANCE NATURAL FEATURES THAT HAVE A POSITIVE
IMPACT ON REDUCING OVERALL FLOOD RISK 
a) SEPA and planning authorities are required to engage early in the
development plan process to identify opportunities for the restoration and
protection of natural features which help manage flood risk. Opportunities should
be maximised to achieve multiple benefits such as the development of green /
blue infrastructure and improved place making. Areas of land that may contribute
to flood management should be identified and protected.

Page 142

Tay Local Flood Risk Management Plan 
Annex 3 | 141 
NEW DEVELOPMENTS ARE DESIGNED TO ENSURE THAT SURFACE WATER
DRAINAGE DOES NOT INCREASE FLOOD RISK ON OR OFF SITE 
a) SEPA prepares guidance for planning authorities and developers on the use of
surface water hazard maps for land use planning purposes.
b) Planning authorities support the implementation of Surface Water
Management Plans, developed by the local authorities, through development
plan allocations and policies. Surface Water Management Plans should take
account of development opportunities that could contribute to the reduction of
surface water flood risk.
c) SEPA engages at an early stage of the development plan process to progress
exemplar projects that demonstrate the potential for land use planning to
mitigate surface water flooding and contribute to wider environmental benefits. 
NEW DEVELOPMENT IS RESILIENT TO PREDICTED FUTURE CHANGES IN
CLIMATE 
a) Planning authorities ensure that climate change is considered in Strategic
Flood Risk Assessments and Flood Risk Assessments, based upon the best
scientific evidence and the information requirements of planners to make
informed decisions.

Page 143

Tay Local Flood Risk Management Plan 
Annex 4 | 142 
Annex 4: Strategic Environmental Assessment & Habitats Regulations Appraisal 
Strategic Environmental Assessment
The Environmental Assessment (Scotland) Act 2005 places a duty on Perth & Kinross
Council to identify and assess the environmental consequences of its proposals.
There are likely to be significant environmental effects associated with the Tay Local
Flood Risk Management Plan. As a consequence, an environmental assessment is
necessary. SEPA have completed an environmental assessment for their Flood Risk
Management Plans and their environmental report has been published. Following a
review of this assessment, it has been confirmed that this will cover the Tay Local
Flood Risk Management Plan and that no further assessment is required. A screening
report was submitted to the SEA Gateway to confirm this. The screening responses
received via the SEA Gateway confirmed that this Plan is consistent with the Tay
Flood Risk Management Plan and therefore no further assessment is required at this
time. Further impact assessments will be undertaken on any specific projects as
required. The screening report can be viewed via the SEA Gateway by searching for
Perth & Kinross Council at the following link;
https://www.strategicenvironmentalassessment.gov.scot/ 
Habitats Regulations Appraisal
The Tay Local Flood Risk Management Plan was considered in light of the
assessment requirements of regulation 48(1) of the Conservation (Natural Habitats,
&c) Regulations 1994 (as amended) by Perth and Kinross Council as the competent
authority responsible for adopting the Plan and any assessment of it required by the
Regulations.
Following screening out of sites where there were no credible impact pathways from
the proposals within the Local Flood Risk Management Plan, a list of European sites
potentially affected by the Plan is given below:
• River Tay SAC
• Shingle Islands SAC
• Black Wood of Rannoch SAC
• Glenartney Juniper Wood SAC
• Upper Strathearn Oakwoods SAC
• Loch of Kinnordy SPA
Having carried out a ‘screening’ assessment of the Plan, the competent authority has
concluded that 20 actions in the Plan have been assessed as having a likely
significant effect on a European site. The following generic mitigation statement has
been applied: ‘Therefore, to be in accord with the Tay Local Flood Risk Management
Plan, the responsible authority should seek to ensure that the action will not have an

Page 144

Tay Local Flood Risk Management Plan 
Annex 4 | 143 
adverse effect on the integrity of any Natura site (SPA or SAC) before any consents or
permissions are granted’. This statement ensures that a more detailed assessment of
each action is carried out as more detail becomes available (i.e., at the project level).
This may require the inclusion of suitable mitigation during the development of these
actions in the first planning cycle.
NatureScot was consulted on this conclusion (on 29th July 2022) and has agreed with
it (following the adoption of any recommended changes).

Page 145

Tay Local Flood Risk Management Plan 
Annex 5 | 144 
Annex 5: Links to Other Plans, Policies, Strategies and Legislative Requirements 
Other Plans, Policies, Strategies and Legislative Requirements
The following plans, policies strategies and legislative requirements are relevant to this
Plan:
Council/
Responsible
Authority
Details of Plan Hyperlink or web address
Perth &
Kinross
Council
Strategic Development
Plan
https://www.tayplan-
sdpa.gov.uk/publications 
Perth &
Kinross
Council
Strategic Development
Plan (TAYPlan
Website)
http://www.tayplan-
sdpa.gov.uk/strategic_development_plan 
Perth &
Kinross
Council
Local Development Plan
https://www.pkc.gov.uk/media/45242/Ado
pted-Local-Development-Plan-
2019/pdf/LDP_2_2019_Adopted_Interacti
ve.pdf?m=637122639435770000
Perth &
Kinross
Council
Local Development Plan
(website link) http://www.pkc.gov.uk/developmentplan
Perth &
Kinross
Council 
Supplementary
Guidance - Developers
Guidance Note on
Flooding & Drainage
https://www.pkc.gov.uk/ldp2floodrisk 
Angus
Council Local Development Plan
https://archive.angus.gov.uk/localdevelop
mentplan/AngusDevelopmentPlanSchem
e2014.pdf
Stirling
Council Local Development Plan
https://my.stirling.gov.uk/services/plannin
g-and-the-environment/planning-and-
building-standards/local-and-statutory-
development-plans/local-development-
plan 
Fife Council
TAYPlan and SESPlan
are the soon to be
adopted Strategic
Development Plans
https://www.fifedirect.org.uk/topics/index.
cfm?fuseaction=service.display&p2sid=B
A85256B-C559-16FB-
C2D8A09D3FEB7E83&themeid=2B482E
89-1CC4-E06A-52FBA69F838F4D24 
Fife Council
Local Development
Plan due to be
adopted in 2016
https://www.fifedirect.org.uk/topics/index.
cfm?fuseaction=page.display&p2sid=D61
AC1F5-DD4B-CE6A-
51E3BDDED79D5ABC&themeid=2B482
E89-1CC4-E06A-52FBA69F838F4D24 
Fife Council Adopted St Andrews &
East Fife Local Plan
http://fife-
consult.objective.co.uk/portal/fife_ldp/fifep
lan_-_adopted_plan_13/adopted_fifeplan

Page 146

Tay Local Flood Risk Management Plan 
Annex 5 | 145 
Fife Council Adopted Mid Fife Local
Plan
http://fife-
consult.objective.co.uk/portal/fife_ldp/fifep
lan_-_adopted_plan_13/adopted_fifeplan 
Fife Council Adopted Dunfermline
& West Fife Local Plan
http://fife-
consult.objective.co.uk/portal/fife_ldp/fifep
lan_-_adopted_plan_13/adopted_fifeplan 
Fife Council
South East Scotland
and Tay Strategic
Transport Plans
http://sestran.gov.uk/
https://tactran.gov.uk/ 
Fife Council Shoreline
Management Plan
https://www.fifedirect.org.uk/minisites/ind
ex.cfm?fuseaction=page.display&pageid=
B3679654-A6D1-5C31-
F426BD276B04EF36&siteID=B35A78B8-
9AF8-3BC3-A4DA217231595BC2 
Scottish
Water
General Guidance on
Flooding
http://www.scottishwater.co.uk/you-and-
your-home/your-home/flooding-
information
SEPA
The river basin
management plan for
the Scotland river
basin district: 2015–
2027
http://www.sepa.org.uk/environment/wate
r/river-basin-management-planning/
SEPA
FRM Strategy Tay Local
Plan District, December
2015
http://apps.sepa.org.uk/FRMStrategies/ta
y.html
SEPA
FRM Strategies for
Scotland
Environmental Report,
December 2015
http://www.sepa.org.uk/environment/wate
r/flooding/FRM-strategies/frminfo/
SEPA Land use planning
guidance
http://www.sepa.org.uk/environment/land/
planning/
SEPA Flood Maps http://www.sepa.org.uk/environment/wate
r/flooding/flood-maps/
Forestry
And Land
Scotland
Control of Woodland
https://scotland.forestry.gov.uk/supporting
/strategy-policy-guidance/woodland-
expansion/control-of-woodland-removal 
Loch
Lomond &
Trossachs
NPA
Local Development Plan
(Adopted)
http://www.lochlomond-
trossachs.org/planning/planning-
guidance/local-development-plan/ 
Cairngorms
NPA
National Park
Partnership Plan 2012-
2017
http://cairngorms.co.uk/authority/publicati
on/299/
Cairngorms
NPA
Local Development Plan
2015
http://cairngorms.co.uk/park-
authority/planning/local-dev-plan/

Page 147

Tay Local Flood Risk Management Plan 
Annex 5 | 146 
Section 18 Schedule of Clearance and Repair Works
The following links provide access to the schedules of clearance and repair produced
by the local authorities in the Tay Local Plan District. The schedules are a requirement
of Section 18 of the Flood Risk Management (Scotland) Act 2009. 
Local Authority Method of Public Access to the 
Schedule of Clearance and Repair Works
Perth & Kinross
Council
Perth & Kinross Council’s Schedule of Clearance & Repair
Works is available at the following web address:
https://www.pkc.gov.uk/article/14718/Flooding-duties-and-
responsibilities
or via the direct link:
https://www.pkc.gov.uk/media/22028/Schedule-of-
watercourse-clearance-and-
repair/pdf/2022_02_25_Schedule_of_Watercourse_Cleara
nce_and_Repair_-_2021-22.pdf?m=637813829018370000
Angus Council Currently only obtainable in hard copy from:
County Buildings, Market Street, Forfar, Angus, DD8 3WE
Fife Council
Fife Council’s Schedule of Clearance & Repair is available
at the following web address:
http://www.fifedirect.org.uk/topics/index.cfm?fuseaction=pa
ge.display&p2sid=618DD563-ABBC-ECA5-
1675450324EED528&themeid=81E299FB-1BCF-4994-
8C8A-233463B738F6
Stirling Council Currently only available on request at;
Endrick House, Kerse Road, Stirling FK7 7SZ 
Surface Water Management Plans
As noted in Chapter 2 of this Plan, surface water flooding is experienced in areas of the
Tay Local Plan District. This will be addressed by Surface Water Management
Planning. A brief description of the work that is currently being carried, out or is
planned, within the Tay Local Plan District is provided below. 
Perth and Kinross Council
Scottish Water and Perth and Kinross Council completed the Perth Integrated
Catchment Study in December 2019. Perth and Kinross Council worked in partnership
with Scottish Water on this study. The Council is currently leading on the development
of the Perth Surface Water Management Plan in partnership with Scottish Water and
SEPA. This is being informed by the work of the integrated catchment study and will
identify and implement the most sustainable actions to manage surface water flooding
in the area.

Page 148

Tay Local Flood Risk Management Plan 
Annex 5 | 147 
The development of a surface water management plan for Blairgowrie and Rattray
commenced in October 2022. This project will also consider the flood risk on the
Rattray Burn.
Further surface water management plans are also proposed for Scone, Comrie and
Aberfeldy and will commence later in the second flood risk management planning cycle. 
Angus Council
Angus Council will lead on the development of a Surface Water Management Plan for
Forfar. This work will be carried out in partnership with Scottish Water and SEPA and
will identify the most sustainable measures to manage surface water flooding in the
area. 
Fife Council
Fife Council has no surface water management planning actions to deliver within the
Tay Local Plan District. 
Stirling Council
Stirling Council has no surface water management planning actions to deliver within the
Tay Local Plan District.

Page 149

Tay Local Flood Risk Management Plan 
Annex 6 | 148 
Annex 6: Supporting information
The following information has been extracted from the Tay Flood Risk Management
Plan 
Sources of Flooding Described in the Plan 
The Tay Flood Risk Management Plan addresses the risk of flooding from rivers, the
coast and surface water. The risk of flooding from rivers is usually due to rainfall
causing a river to rise above bank level spreading out and inundating adjacent areas.
Coastal flooding is where the risk is from the sea. Sea levels can change in response
to tidal cycles or atmospheric conditions. Over the longer term, sea levels and
coastal flood risk may change due to climate change. Surface water flooding
happens when rainwater does not drain away through the normal drainage systems
or soak into the ground but lies on or flows over the ground instead. There can be
interactions between these sources of flooding. 
Groundwater is usually a contributing factor to flooding rather than the primary
source. It is caused by water rising up from underlying rocks or flowing from springs.
Actions to directly target groundwater are quite limited in the Plan. However,
susceptibility to the contributing effects of groundwater on flooding was considered
everywhere in the national flood risk assessment which underpins the Plan. Maps of
areas where groundwater can contribute to flood risk are available to view on
SEPA’s website: https://map.sepa.org.uk/floodmap/map.htm 
The following aspects of flooding have not been incorporated into the Plan: 
• Reservoir breaches have been assessed under separate legislation
(Reservoirs (Scotland) Act 2011) and so flood risk from reservoir breach is not
considered in this plan. There are fundamental differences in probability of
flooding and associated management actions for reservoirs. Further information
and maps can be found on SEPA’s website at:
www.sepa.org.uk/regulations/water/reservoirs/
• The Flood Risk Management (Scotland) Act 2009 does not require SEPA or
responsible authorities to assess or manage coastal erosion. However, SEPA
has included consideration of erosion in the Flood Risk Management Plans by
identifying areas that are likely to be susceptible to erosion and where erosion
can exacerbate flood risk. As part of considering where actions might deliver
multiple benefits, SEPA have looked to see where the focus of coastal flood risk
management studies coincides with areas at risk of coastal erosion as identified
by the Dynamic Coast project. Subsequent detailed flood studies and scheme
design will need to consider coastal erosion in these areas. This includes
ensuring that actions to manage flood risk do not contribute to increased coastal

Page 150

Tay Local Flood Risk Management Plan 
Annex 6 | 149 
erosion and where appropriate, help to manage risks from coastal erosion now
and in the future.
• Coastal flood modelling. The information on coastal flooding used to set
objectives and identify actions is based on SEPA modelling using simplified
coastal processes and flooding mechanisms.As a result, coastal flood risk may
be underestimated in some areas and overestimated in others. Where more
detailed local models were available from flood studies or from flood warning
schemes, these have been incorporated into the development of the flood risk
management plans, as have other sources of local information such as records
of past flooding. SEPA is currently working on updates to the national coastal
flood mapping to better represent the effects of waves. Actions in the plans
reflect the best information currently available. 
Commonly Used Terms 
Below are explanatory notes for the commonly used terms in this local flood risk
management plan. A glossary of terms is also available. 
• Reference to flood risk. To develop this Plan, flood risk has been assessed
over a range of likelihoods. For consistency in reporting information, unless
otherwise stated, all references to properties or other receptors being ‘at risk of
flooding’ refer to a medium likelihood flood (up to a 0.5% chance of flooding in
any given year). By exception, references will be made to high or low risk
flooding, which should be taken to mean a 10% chance/likelihood or 0.1% 
chance/likelihood of flooding in any given year respectively. 
Chance / Likelihood of flooding
Likelihood Return Period Annual Chance
High  10 year 10%
Medium  200 year 0.5%
Low  1000 year 0.1% 
• An Annual Cost of Flooding is given as an assessment of the economic impact
of flooding within an area. Depending on its size or severity each flood will cause
a different amount of damage to a given area. Annual average damages are the
theoretical average economic damages caused by flooding when considered
over many years. It does not mean that value of damage will occur every year: in
many years there will be no damages and in some years the damages will be
minor. In most places, there will be a very small number of years when much
bigger floods occur, and that is when the highest damage costs will occur. To
assess the annual cost, this is averaged over many years. In some areas,
smaller floods which happen frequently contribute more to the annual cost than
much larger events which are rarer. Within the plans, the annual cost of flooding
has been calculated based on the methods set out in the Flood Hazard
Research Centre’s Multi-Coloured Handbook (2016).

Page 151

Tay Local Flood Risk Management Plan 
Annex 6 | 150 
• History of flooding. The history of flooding sections of this document report
floods that have occurred up to November 2022. 
Flood risk management planning process 
Flood risk management in Scotland aims to manage flooding in a sustainable way.
Sustainable flood risk management considers where floods are likely to occur in the
future and takes action to reduce their impact without moving the problem
elsewhere. It considers all sources of flooding, whether from rivers, the sea or from
surface water. It delivers actions that will meet the needs of present and future
generations whilst also protecting and enhancing the environment. 
The sustainable approach to managing flood risk works on a six-year planning cycle,
progressing through the key stages outlined below. 
Identifying priority areas at significant flood risk 
The first step to delivering a risk-based, sustainable and plan-led approach to flood
risk management was SEPA’s second National Flood Risk Assessment, which
was published in 2018. The assessment considered the likelihood of flooding from
rivers, groundwater, and the sea, as well as flooding caused when heavy rainfall is
unable to enter drainage systems or the river network. The likelihood of flooding was
examined alongside the estimated impact on people, the economy, cultural heritage
and the environment. It significantly improved our understanding of the causes and
consequences of flooding and identified areas most vulnerable to floods. 
Based on the second National Flood Risk Assessment, SEPA identified areas where
flooding was considered to be nationally significant. These areas are based on
catchment units as it is within the context of the wider catchment that flooding can be
best understood and managed. These nationally significant catchments are referred
to as Potentially Vulnerable Areas. In Scotland, 235 Potentially Vulnerable Areas
were identified. They are estimated to contain around 90% of the total number of
properties at risk. 
Improving the understanding of flooding 
SEPA has developed flood hazard and flood risk maps. These maps improved our
understanding of flooding and helped inform the subsequent selection of actions to
manage flood risk in Potentially Vulnerable Areas. The flood hazard maps show
information such as the extent of flooding, water level, as well as depth and velocity
where appropriate. The flood risk maps provide detail on the impacts on people, the
economy, cultural heritage and the environment. 
In 2012 SEPA also developed an assessment of the potential for natural flood
management. The assessment produced the first national source of information on
where natural flood management actions would be most effective within Scotland. 
Flood hazard and flood risk maps and the assessment of the potential for natural
flood management can be viewed on SEPA’s website at www.sepa.org.uk.

Page 152

Tay Local Flood Risk Management Plan 
Annex 6 | 151 
Identifying objectives and selecting actions 
The objectives and actions to manage flooding will provide the long-term vision and
practical steps for delivering flood risk management in Scotland. 
Working collaboratively with local partnerships, SEPA has agreed the objectives for
addressing the main flooding impacts. Actions that could deliver these agreed
objectives have been selected to ensure the right combinations are identified. The
actions considered in the development of this Plan include structural actions (such
as building floodwalls, restoring flood plains, or clearance and repair works to rivers)
and non-structural actions (such as flood warning, land use planning or improving
our emergency response). Structural and non-structural actions should be used
together to manage flood risk effectively. 
An assessment of the potential for natural flood management was used to help
identify opportunities for using the land and coast to slow down and store water. 
Natural flood management actions will be considered further in areas where flood
studies are planned.

Page 153

Tay Local Flood Risk Management Plan 
Annex 7 | 152 
Annex 7: Glossary 
TERMINOLOGY  DEFINITION
Accretion Accumulation of sediment.
Actions
Activities undertaken to reduce the impact of
flooding. Referred to as ‘measures’ within the FRM
Act, Actions in the plans describe where and how
flood risk will be managed. These actions have been
set by SEPA and agreed with flood risk management
authorities and were subject to public consultation.
Section 1.2.6 of the flood risk management plans
describes how actions have been selected.
Adaptation Plan
An adaptation plan is intended to inform medium to
long term management of an area. This plan should
investigate multiple potential climate change
scenarios and identify the best route to flood
management under each scenario.
Annual Average Damages
(AAD)
Depending on its size or severity each flood will
cause a different amount of damage to a given area.
Annual average damages (AADs) are the theoretical
average economic damages caused by flooding
when considered over a very long period of time. It
does not mean that level of damage will occur every
year: in many years there will be no damages, in
some years minor damages and in a few years major
damages may occur. High likelihood events, which
occur more regularly, contribute proportionally more
to AADs than rarer events. Within the flood risk
management plans AADs incorporate economic
damages to the following receptors: residential
properties, nonresidential properties, vehicles,
emergency services, agriculture and roads. They
have been calculated based on the principles set out
in the Flood Hazard Research Centre Multi-Coloured
Manual (2016). 
Annual cost of flooding
An annual cost of flooding is an assessment of the
economic impact of flooding within an area.
Depending on its size or severity each flood will
cause a different amount of damage to a given area.
See ‘annual average damages’.
Appraisal
The process of defining objectives, examining flood
management options and weighing up costs,
benefits, risks and uncertainties before a decision is
made. The appraisal method used in the flood risk
management plans is designed to set objectives and
identify the most sustainable combination of actions

Page 154

Tay Local Flood Risk Management Plan 
Annex 7 | 153 
to tackle flooding from rivers, the sea and surface
water.
Appraisal baseline Defines the existing level of flood risk under the
current flood risk management regime.
Area of benefit (AOB)
An area which has benefited from a flood defence or
flood protection scheme and is now at a reduced risk
of flooding relative to the scheme’s standard of
protection.
Assets
Flood risk assets are structures and features which
are likely to have a significant effect on flood risk.
These can include pumping stations, culverts, walls
and river banks.
Awareness Raising
Public awareness, participation and community
support are essential components of sustainable
flood risk management. Improved awareness of flood
risk and actions that prepare individuals, homes and
businesses for flooding can reduce the overall
impact. SEPA and other responsible authorities have
a duty to raise public awareness of flood risk. This is
undertaken both individually and collaboratively by a
range of organisations. 
Bathing waters
Bathing waters are classed as protected areas under
Annex IV of the Water Framework Directive (WFD).
There are 84 designated bathing waters in Scotland.
Benefit cost ratio (BCR)
A benefit cost ratio summarises the overall value for
money of an action or project. It is expressed as the
ratio of benefits to costs (both expressed as present
value monetary values). A ratio greater than 1:1
indicates that the economic benefits associated with
an action are greater than the economic costs of
implementation; therefore, this is taken as the
threshold of economic viability. It should be
recognised that it is not always possible to accurately
estimate economic values for all elements of benefit,
and benefit cost ratio is just one of a number of
techniques used in appraisal. 
Blue green infrastructure 
Blue green infrastructure refers to use of green
pathways to store or transfer excess water and
includes sustainable drainage systems, swales
(shallow, broad and vegetated channels designed to
store and/or convey runoff and remove pollutants),
wetlands, rivers, canals (and their banks) and all
watercourses. See also green infrastructure.
Bund  See flood bund 
Candidate Potentially
Vulnerable Area (PVAc) 
Candidate PVAs are those areas identified after the
National Flood Risk Assessment (2011) as a result of
new information where the impact of flooding is
potentially sufficient to justify further assessment and
appraisal. They will be considered for inclusion as

Page 155

Tay Local Flood Risk Management Plan 
Annex 7 | 154 
new PVAs in the next flood risk management
planning cycle. 
Catchment  All the land drained by a river and its tributaries. 
Category 1 and 2
Responders 
(Cat 1 / 2) 
Category 1 and 2 responders are defined as part of
the Civil Contingencies Act 2004 which seeks to
minimise disruption in the event of an emergency. 
• Category 1 responders are ‘core’ responders:
local authorities, police, fire and rescue services,
ambulance service, NHS health boards, SEPA
and the Maritime and Coastguard Agency.
• Category 2 responders are key co-operating
responders in support of Category 1 responders.
These include gas and electricity companies, rail
and air transport operators, harbour authorities,
telecommunications providers, Scottish Water,
the Health and Safety Executive and NHS
National Services Scotland.
Channel (capacity)
improvement 
Where work has been carried out on a river channel
allowing an increase in the volume of water it can
carry. 
Characterisation 
A description of the natural characteristics of
catchment, coastlines and urban areas in terms of
hydrology, geomorphology, topography and land
use. It also includes the characterisation of existing
levels of flood risk and activities to manage flood risk. 
Coastal flooding 
Coastal flooding is where the risk is from the sea.
Flooding can result from high sea levels or a
combination of high sea levels and stormy
conditions. The term coastal flooding is used under
the Flood Risk Management (Scotland) Act 2009, but
in some areas it is also referred to as tidal flooding
and covers areas such as estuaries and river
channels that are influenced by tidal flows. 
Combines sewer
Combined sewers transport sewage from homes and
industry and also carry surface water runoff from
gutters, drains and some highways. Heavy or
prolonged rainfall can rapidly increase the flow in a
combined sewer until the amount of water exceeds
sewer capacity.
Combined sewer (overflow)
(CSO) 
Combined sewer overflows are structures designed
to ensure any excess water from sewerage systems
is discharged in a controlled way and at a specific
managed location. 
Community facility 
Within the plans the term ‘community facilities’
includes:
• Emergency services (police, fire, ambulance,
coastguard, and mountain rescue)

Page 156

Tay Local Flood Risk Management Plan 
Annex 7 | 155 
• Educational buildings (crèche, nursery, primary,
secondary, further, higher and special education
premises)
• Healthcare facilities: hospitals, health centres and
residential care homes
Competent Authority  SEPA’s designation
Community flood action
groups
Community flood action groups are community-
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ in
composition and remit. There are over 60 groups
already established in Scotland. The Scottish Flood
Forum provides support for both new and existing
groups.
Confluence  Where two or more rivers meet. 
Conveyance
Conveyance is a measure of the carrying capacity of
a watercourse. Increasing conveyance enables flow
to pass more rapidly and reducing conveyance slows
flow down. Both actions can be effective in managing
flood risk depending on local conditions.
Cross Border Advisory
Group (CBAG)
The Cross Border Advisory Group is a statutory
group made up of representatives from the
Environment Agency, SEPA, Scottish Water and the
4 local authorities located within the Solway-Tweed
River Basin District. This group ensure coordination
of plans across the border between England and
Scotland.
Cultural heritage site 
Historic Environment Scotland maintains lists of
buildings of special architectural or historic interest.
These buildings are referred to as ‘listed buildings’.
The highest level of designation is a World Heritage
Site. Other designations included in this assessment
are scheduled monuments, gardens and designed
landscapes, and battlefields.
Culvert 
A pipe, channel or tunnel used for the conveyance of
a watercourse or surface drainage water under a
road, railway, canal or other obstacle. 
Damages  See ‘Annual Average Damages’, ‘direct damages’,
‘indirect damages’. 
Demountable defences 
A temporary flood barrier is one that is only installed
when the need arises, that is, when high flood levels
are forecast. A demountable flood defence is a
particular form of temporary defence that requires
built-in parts and therefore can only be deployed in
one specific location.v
Deposition  A natural process leading to an accumulation of
sediment on a river bed, floodplain or coastline.

Page 157

Tay Local Flood Risk Management Plan 
Annex 7 | 156 
Direct damages 
Defined in the appraisal process as immediate
damages to the receptor as a result of flooding (e.g.
damages to the fabric or content of buildings, clean-
up costs).
Economic impact 
An assessment of the economic value of the positive
and negative effects of flooding and the actions
taken to manage floods. 
Embankment 
Flood embankments are earthfill structures designed
to contain high river levels. They are commonly
grass-covered, but may need additional protection
against erosion by swiftly flowing water, waves or
overtopping.
Emergency plans /
response
Emergency response plans are applicable for all
types of flooding. They set out the steps to be taken
during flooding in order to maximise safety and
minimise impacts where possible. Under the Civil
Contingencies Act, Category 1 Responders have a
duty to maintain emergency plans. Emergency plans
may also be prepared by individuals, businesses,
organisations or communities.  
Environmental impact  A change in the environment that could have a
negative or positive effect on the ecosystem. 
Environmental Impact
Assessment (EIA) 
Environmental Impact Assessment (EIA) is a process
which identifies the potential environmental effects,
both negative and positive, of a proposal. 
Environmental sites /
environmental designated
areas/ environmentally
designated sites 
Areas formally designated for environmental
importance, such as Sites of Special Scientific
Interest (SSSI), Special Protection Area (SPA) or
Special Areas of Conservation (SAC). 
Episodic erosion  Erosion induced by a single event such as a storm. 
Erosion  A natural process leading to the removal of sediment
from a river bed, bank or floodplain or coastline. 
Estuarine surge attenuation  How an estuary influences the dissipation of coastal
surges caused by tides or weather. 
Estuary 
A coastal body of water usually found where a river
meets the sea; the part of the river that is affected by
tides. 
Fault (fault line) 
A break or fracture in the ground that occurs when
the Earth's tectonic plates move. In Scotland the
Highland Boundary Fault is the major geological fault
line cutting diagonally across the Highlands from Fort
William to Inverness. It is also known as the Great
Glen. 
Fetch  The distance travelled by wind or waves across open
water.
Flash flood 
A flash flood is a flood that occurs in a short period of
time after high intensity rainfall or a sudden snow
melt. A sudden increase in the level and velocity of
the water body is often characteristic of these events.

Page 158

Tay Local Flood Risk Management Plan 
Annex 7 | 157 
Rising water levels in the river network can reach a
peak within minutes to a few hours of the onset of the
flood event, leaving a short time for warning or
actions.
Flashy watercourse 
A 'flashy' river or watercourse has a short lag time
(the delay between peak rainfall intensity and peak
river discharge), high peak discharge, and quickly
returns to average flow. Rivers with these
characteristics can be more likely to flood and leave
a short time for warning or actions. 
Flood 
A flood can be defined as the period of time flooding
is expected, occurs and drains away. It causes
significant adverse impacts on people, property,
environment or infrastructure and is not a result of
regular weather or infrastructure drainage. 
Flood bund  A constructed retaining wall, embankment or dyke
designed to prevent flooding. 
Flood defence 
Infrastructure, such as flood walls and embankments,
intended to protect an area against flooding to a
specified standard of protection. 
Flood extent  The area that has been affected by flooding, or is at
risk of flooding from one or more sources. 
Flood forecasting
SEPA operates a network of over 250 rainfall, river
and coastal monitoring stations throughout Scotland
that generate data 24 hours a day. This hydrological
information is combined with meteorological
information from the Met Office. A team of experts
then predict the likelihood and timing of river, coastal
and surface water flooding. This joint initiative
between SEPA and the Met Office forms the Scottish
Flood Forecasting Service.
Flood frequency  How often we expect a flood to happen (see
likelihood). 
Flood gate 
An adjustable, sometimes temporary, barrier used as
a flood defence to control the flow of water within a
water system or during a flood. 
Flood hazard  In terms of the FRM Act, hazard refers to the
characteristics (extent, depth, velocity) of a flood. 
Flood hazard map 
Required by the FRM Act to show information that
describes the nature of a flood in terms of the source,
extent, water level or depth and velocity of water,
where appropriate. 
Flood Prevention Scheme /
Flood Protection Scheme
(FPS) 
Flood defence measures (flood prevention schemes)
formerly promoted under the Flood Prevention
(Scotland) Act 1961 can now be taken forward under
the FRM Act by a local authority to reduce flood risk.
A flood protection scheme, as defined by the FRM
Act, is a scheme by a local authority for the
management of flood risk within the authority’s area.

Page 159

Tay Local Flood Risk Management Plan 
Annex 7 | 158 
Flood protection study 
A detailed assessment of an area for flood risk. The
study may assess what is at risk of flooding with
more accuracy and provide options for dealing with
the risk of flooding. 
Flood protection works 
Flood protection works can include the same flood
defence measures that would make up a flood
protection scheme but without the legal
requirements, process and protections that would
come by designating the works as a scheme. 
Flood risk 
A measure of the combination of the likelihood of
flooding occurring and the associated impacts on
people, the economy and the environment. 
Flood Risk Assessment
(FRA) 
Flood Risk Assessments are detailed studies of an
area where flood risk may be present. These are
often used to inform planning decisions, develop
flood schemes and they also contributed to the
National Flood Risk Assessment. 
Flood Risk Management
(Scotland) Act 2009 
(FRM Act) 
The flood risk management legislation for Scotland. It
transposes the EC Floods Directive into Scots Law
and aims to reduce the adverse consequences of
flooding on communities, the environment, cultural
heritage and economic activity. 
Flood risk management
cycle 
Under the FRM Act flood risk management planning
is to occur in six year cycles. The second cycle is
2022 – 2028. 
Flood Prevention
(Scotland) Act 1961 
The Flood Prevention (Scotland) Act 1961 gave local
authorities discretionary powers to make and build
flood prevention schemes. It was superseded by the
Flood Risk Management (Scotland) Act 2009. 
Flood Risk Management
Local Advisory Groups 
FRM Local Advisory Groups are stakeholder groups
convened to advise SEPA and lead local authorities
in the preparation of Flood Risk Management Plans.
SEPA and lead local authorities must have regard to
the advice they provide. 
Flood Risk Management
Plans (FRM Plans) 
A term used in the FRM Act. FRM Plans set out the
actions that will be taken to reduce flood risk in a
Local Plan District. They comprise Flood Risk
Management Strategies, developed by SEPA, and
Local Flood Risk Management Plans produced by
lead local authorities. 
Flood Risk Management
Flood Risk Management
Strategy 
(FRM Flood Risk
Management Strategy) 
Sets out a long-term vision for the overall reduction
of flood risk. They contain a summary of flood risk in
each Local Plan District, together with information on
catchment characteristics and a summary of
objectives and actions for Potentially Vulnerable
Areas. 
Flood risk map 
Builds on flood hazard maps providing detail on the
impacts of flooding on people, the economy and the
environment.

Page 160

Tay Local Flood Risk Management Plan 
Annex 7 | 159 
Flood wall  A flood defence feature used to defend an area from
flood water. 
Flood Warning area 
(FWA) 
A Flood Warning area is where SEPA operates a
formal Flood Monitoring Scheme to issue targeted
Flood Warning messages for properties located in
the area.
Flood warning scheme 
A flood warning scheme is the network of monitoring
on a coastal stretch or river, which provides SEPA
with the ability to issue Flood Warnings. 
Floodplain 
Area of land that borders a watercourse, an estuary
or the sea, over which water flows in time of flood, or
would naturally flow but for the presence of flood
defences and other structures where they exist. 
Floodplain storage 
Floodplains naturally store water during high flows.
Storage can be increased through natural or man-
made features to increase flood depth or slow flows
to reduce flooding elsewhere. 
Floods Directive 
European Directive 2007/60/EC on the Assessment
and Management of Flood Risks builds on and is
closely related to the Water Framework Directive
(see river basin management planning). It was
transposed into Scots Law by the Flood Risk
Management (Scotland) Act 2009. The Directive
requires Member States to assess if all watercourses
and coastlines are at risk from flooding, to map the
flood extent, assets and humans at risk in these
areas and to take adequate and coordinated
measures to reduce this flood risk.
Fluvial flooding  Flooding from a river or other watercourse. 
Gabion  A metal cage filled with rocks to walls often used in
river bank protection. 
Green infrastructure 
The European Commission defines green
infrastructure as “the use of ecosystems, green
spaces and water in strategic land use planning to
deliver environmental and quality of life benefits. It
includes parks, open spaces, playing fields,
woodlands, wetlands, road verges, allotments and
private gardens. Green infrastructure can contribute
to climate change mitigation and adaptation, natural
disaster risk mitigation, protection against flooding
and erosion as well as biodiversity conservation.”
See also ‘blue infrastructure’.
Groundwater flooding 
This type of flooding is caused by water rising up
from underlying rocks or flowing from springs.
Groundwater is generally a contributing factor to
flooding rather than the primary source. 
Hydrometric areas 
These are either whole river catchments having one
or more outlets to the sea or tidal estuary, or they
may include several connected river catchments

Page 161

Tay Local Flood Risk Management Plan 
Annex 7 | 160 
having similar surface features but with separate tidal
outlets.xi There are 107 hydrometric areas in the UK,
45 of which are in Scotland. 
Indirect damages 
Defined in the appraisal process as damages
incurred due to the knock on effects of flooding such
as disruption, evacuation, costs to emergency
services, loss of income or earnings/industrial
production. (See also ‘direct damages’). 
Integrated catchment study 
(ICS) 
In urban areas, the causes of flooding are complex
because of the interactions between rivers, surface
water drainage and combined sewer systems and
tidal waters. Scottish Water works with SEPA and
local authorities to assess these interactions through
detailed studies. 
Land use planning 
(LUP) 
The process undertaken by public authorities to
identify, evaluate and decide on different options for
the use of land, including consideration of long term
economic, social and environmental objectives and
the implications for different communities and interest
groups. 
Lead authority
A local authority responsible for the production,
consultation, publication and review of a Local Flood
Risk Management Plan. 
Likelihood of flooding 
The chance of flooding occurring. 
High likelihood: A flood is likely to occur in the
defined area on average once in every ten years
(1:10). Or a 10% chance of happening in any one
year. 
Medium likelihood: A flood is likely to occur in the
defined area on average once in every two hundred
years (1:200). Or a 0.5% chance of happening in any
one year. 
Low likelihood: A flood is likely to occur in the
defined area on average once in every thousand
years (1:1000). Or a 0.1% chance of happening in
any one year. 
Local Development Plans 
Each planning authority area in Scotland is covered
by a Local Development Plan, which sets out where
most new developments are proposed and the
policies that will guide decision-making on planning
applications. The four main city regions in Scotland
(Aberdeen, Dundee, Edinburgh and Glasgow) are
also covered by a Strategic Development Plan which
sets out the long-term development of the city region
and deals with region-wide issues such as housing
and transport. 
Local Flood Risk
Management Plans 
(Local FRM Plan) 
Local Flood Risk Management Plans, produced by
lead local authorities, will take forward the objectives
and actions set out in Flood Risk Management
Strategies. They will provide detail on the funding,

Page 162

Tay Local Flood Risk Management Plan 
Annex 7 | 161 
timeline of delivery, arrangements and coordination
of actions at the local level during each six year FRM
planning cycle. 
Local Nature Reserve 
Local nature reserves are areas of at least locally
important natural heritage, designated and managed
by local authorities to give people better
opportunities to learn about and enjoy nature close to
where they live. Local authorities select and
designate local nature reserves using their powers
under the National Parks and Access to the
Countryside Act 1949
Local Plan District (LPD)
Geographical areas for the purposes of flood risk
management planning. There are 14 Local Plan
Districts in Scotland. 
Local Plan District
Partnerships 
Each LPD has established a local partnership
comprised of local authorities, SEPA, Scottish Water
and others as appropriate. These partnerships are
distinct from the FRM Local Advisory Groups and
they retain clear responsibility for delivery of the FRM
actions set out in the Local Flood Risk Management
Plans. It is the local partnership that makes decisions
and supports the delivery of these plans. 
Maintenance
Sections 18 and 59 of the Flood Risk Management
(Scotland) Act 2009 put duties of watercourse
inspection, clearance and repair on local authorities.
In addition, local authorities may also be responsible
for maintenance of existing flood protection schemes
or defences.
Montane habitat  This habitat encompasses a range of natural or near-
natural vegetation occurring in the montane zone,
lying above or beyond the natural tree-line. 
National Flood
Management Advisory
Group 
(NFMAG) 
The National Flood Management Advisory Group
provides advice and support to SEPA and, where
required, Scottish Water, local authorities and other
responsible authorities on the production of FRM
Strategies and Local FRM Plans. 
National Flood Risk
Assessment 
(NFRA) 
A national analysis of flood risk from all sources of
flooding which also considers climate change
impacts. Completed in December 2011 this provides
the information required to undertake a strategic
approach to flood management that identifies areas
at flood risk that require further appraisal. The NFRA
will be reviewed and updated for the second cycle of
FRM Planning by December 2018. 
Natural flood management
(NFM) 
A set of flood management techniques that aim to
work with natural processes (or nature) to manage
flood risk. 
Non-residential properties 
Properties that are not used for people to live in,
such as shops or other commercial or industrial type
buildings.

Page 163

Tay Local Flood Risk Management Plan 
Annex 7 | 162 
Objectives 
Measurable goals relating to managing flood risk.
The Flood Risk Management Strategies for each of
the 14 Local Plan Districts in Scotland will set out
objectives to reduce flood risk and actions to achieve
those objectives.
Objective Target Area
Target areas are based on communities at risk of
flooding. These are situated within potentially
vulnerable areas and should benefit from actions to
reduce flood risk. Objectives and actions to manage
flooding have been set for each target area in the
flood risk management plans. To benefit the
community, actions may be applied outside the target
area.
One in 200 year flood  See ‘likelihood of flooding’ and ‘return period’. 
Planning policies
Current national planning policies, Scottish Planning
Policy and accompanying Planning Advice notes
restrict development within the floodplain and limit
exposure of new receptors to flood risk. In addition to
national policies, local planning policies may place
further requirements within their area of operation to
restrict inappropriate development and prevent
unacceptable risk.
Potentially Vulnerable
Areas 
(PVA) 
Catchments identified as being at risk of flooding and
where the impact of flooding is sufficient to justify
further assessment and appraisal. There were 243
PVAs identified by SEPA in the National Flood Risk
Assessment and these will be the focus of the first
FRM planning cycle. 
Probability 
The chance of a flood occurring within a given time.
This is also expressed as likelihood of flooding as in
the SEPA flood maps. 
Property level protection 
Property level protection includes flood gates,
sandbags and other temporary barriers that can be
used to prevent water from entering individual
properties during a flood. 
Property level protection
scheme 
Some responsible authorities may have a formal
scheme to provide, install and maintain property level
protection for properties. 
Q&S
Quality and Standards (Q&S) is the process,
governing costs and outputs, through which the
planning and delivery of improvements to the public
drinking water and sewerage services in Scotland is
carried out 
Ramsar sites 
Ramsar sites are wetlands of international
importance designated under the Ramsar
Convention. 
Receptor 
Refers to the entity that may be impacted by flooding
(a person, property, infrastructure or habitat). The
vulnerability of a receptor can be modified by
increasing its resilience to flooding.

Page 164

Tay Local Flood Risk Management Plan 
Annex 7 | 163 
Residual risk 
The risk that remains after risk management and
mitigation. This may include risk due to very severe
(above design standard) storms or risks from
unforeseen hazards. 
Resilience  The ability of an individual, community or system to
recover from flooding. 
Responsible authority 
Designated under the FRM (Scotland) Act 2009 and
associated legislation as local authorities, Scottish
Water and, from 21 December 2013, the National
Park Authorities and Forestry and Land Scotland.
Responsible authorities, along with SEPA and
Scottish Ministers, have specific duties in relation to
their flood risk related functions. 
Return period  The average period of time between occurrences of
a flood event. The longer the return period, the rarer
the event. (See also ‘likelihood of flooding’.) 
Revetment 
Sloping structures placed on banks or at the foot of
cliffs in such a way as to deflect the energy of
incoming water.
Riparian 
The riparian area is the interface between land and a
river or stream. For the purposes of FRM this
commonly refers to the riparian owner, which
denotes ownership of the land area beside a river or
stream. 
River basin district 
Geographic areas over which River Basin
Management and Flood Risk Management Plans are
prepared. In Scotland there are two River Basin
Districts identified under the Water Environment and
Water Services (Scotland) Act 2003 (WEWS Act) -
one for the Solway/Tweed area and one covering the
rest of Scotland. 
River basin management
planning 
(RBMP) 
The Water Environment and Water Services
(Scotland) Act 2003 transposed the European Water
Framework Directive into Scots law. The Act created
the River Basin Management Planning process to
achieve environmental improvements to protect and
improve our water environment. It also provided for
regulations to control the negative impacts of all
activities likely to have an impact on the water
environment. 
Runoff reduction 
Actions within a catchment or sub-catchment to
reduce the amount of runoff during rainfall events.
This can include intercepting rainfall, storing water,
diverting flows or encouraging infiltration. 
Scottish Advisory and
Implementation Forum for
Flooding 
(SAIFF) 
The stakeholder forum on flooding set up by the
Scottish Government to ensure legislative and policy
aims are met and to provide a platform for sharing
expertise and developing common aspirations and
approaches to reducing the impact of flooding on

Page 165

Tay Local Flood Risk Management Plan 
Annex 7 | 164 
Scotland’s communities, environment, cultural
heritage and economy. 
Scottish Government’s
Rural Payments and
Inspections Directorate 
Part of the Scottish Government which has the most
direct dealings with Scotland’s land managers,
including processing grant applications and
payments, carrying out inspections, plant health visits
and estate management. 
Sediment balance 
Within a river where erosion and deposition
processes are equal over the medium to long-term
resulting in channel dimensions (width, depth, slope)
that are relatively stable. 
Self help
Self help actions can be undertaken by any
individuals, businesses, organisations or
communities at risk of flooding. They are applicable
to all sources, frequency and scales of flooding. They
focus on awareness raising and understanding of
flood risk.
Sewer flooding (and other
artificial drainage system
flooding) 
Flooding as a result of the sewer or other artificial
drainage system (e.g. road drainage) capacity being
exceeded by rainfall runoff or when the drainage
system cannot discharge water at the outfall due to
high water levels (river and sea levels) in receiving
waters. 
Shoreline Management
Plan 
(SMP) 
A Shoreline Management Plan is a large scale
assessment of the coastal flood and erosion risks to
people and the developed, historic and natural
environment. It sets out a long-term framework for
the management of these risks in a sustainable
manner. 
Site of Special Scientific
Interest 
(SSSI) 
Sites of Special Scientific Interest are protected by
law under the Nature Conservation (Scotland) Act
2004 to conserve their plants, animals and habitats,
rocks and landforms. 
Site protection plans
Site protection plans are developed to identify
whether normal operation of a facility can be
maintained during a flood. This may be due to
existing protection or resilience of the facility or the
network.
Source of flooding  The type of flooding. This can be coastal, river,
surface water or groundwater. 
Special Area of
Conservation 
(SAC) 
Special Areas of Conservation are strictly protected
sites designated under the European Habitats
Directive. The Directive requires the establishment of
a European network of protected areas which are
internationally important for threatened habitats and
species. 
Special Protection Areas 
(SPA) 
Special Protection Areas are strictly protected sites
classified in accordance with the European Birds
Directive. They are classified for rare and vulnerable

Page 166

Tay Local Flood Risk Management Plan 
Annex 7 | 165 
birds (as listed in the Directive), and for regularly
occurring migratory species
SR10 / SR15
SR10 and SR15 are Scottish Water’s investment
programmes. SR10 covered the period 2010 -2015
and SR15 covers 2015-2021.  For more information
on their investment programme please see
https://www.scottishwater.co.uk/about-
us/publications/strategic-projections
Standard of protection 
(SoP) 
The flood event return period above which significant
damage and possible failure of the flood defences
could occur. 
Storage area 
A feature that can be used to store floodwater, this
can be natural in the form of low lying land or
manmade such as a large reservoir or modified
landform. 
Strategic Environmental
Assessment 
(SEA) 
A process for the early identification and assessment
of the likely significant environmental effects, positive
and negative, of activities. Often considered before
actions are approved or adopted. 
Strategic Flood Risk
Assessment 
(SFRA) 
A Strategic Flood Risk Assessment is designed for
the purposes of specifically informing the
Development Plan Process. A SFRA involves the
collection, analysis and presentation of all existing
and readily available flood risk information (from any
source) for the area of interest. It constitutes a
strategic overview of flood risk. 
Strategic mapping and
modelling
Strategic mapping and modelling actions have been
identified in locations where SEPA is planning to
undertake additional modelling or analysis of
catchments and coastlines, working collaboratively
with local authorities where appropriate, to improve
the national understanding of flood risk.
Surcharge 
Watercourses and culverts can carry a limited
amount of water. When they can no longer cope,
they overflow, or ‘surcharge’. 
Surface water flooding 
Flooding that occurs when rainwater does not drain
away through the normal drainage systems or soak
into the ground, but lies on or flows over the ground
instead
Surface water management
plan 
(SWMP) 
A plan that takes an integrated approach to drainage
accounting for all aspects of urban drainage systems
and produces long term and sustainable actions. The
aim is to ensure that during a flood the flows created
can be managed in a way that will cause minimum
harm to people, buildings, the environment and
business. 
Surface water plan/study
The management of flooding from surface water
sewers, drains, small watercourses and ditches that
occurs, primarily in urban areas, during heavy
rainfall. FRM Strategy actions in this category

Page 167

Tay Local Flood Risk Management Plan 
Annex 7 | 166 
include: Surface Water Management Plans,
Integrated Catchment Studies and assessment of
flood risk from sewerage systems (FRM Act Section
16) by Scottish Water. These have been selected as
appropriate for each Potentially Vulnerable Area.
Surface water runoff  The flow of water from rain, snow melt or other
sources over land.
Sustainable flood risk
management 
An approach which involves taking actions now to
manage the risk of flooding that are robust enough to
stand the test of time. There are three pillars of
sustainability that must be considered -
environmental, social and economic. 
Sustainable drainage
systems 
(SuDS) 
A set of techniques designed to slow the flow of
water. They can contribute to reducing flood risk by
absorbing some of the initial rainfall and then
releasing it gradually, thereby reducing the flood
peak and helping to mitigate downstream problems.
SuDS encourage us to take account of quality,
quantity and amenity / biodiversity. 
Target Area See ‘Objective Target Area’
Training wall  A wall, bank or jetty built to confine and direct the
flow of water. 
UK Climate Change
Projections 
(UKCP09) 
The leading source of climate change information for
the UK. It can help users to assess their climate risks
and plan how to adapt to a changing climate. 
Utility assets 
Within the FRM Strategies this refers to electricity
sub stations, mineral and fuel extraction sites,
telephone assets, television and radio assets. 
Vulnerability 
A measure of how likely someone or something is to
suffer long-term damage as a result of flooding. It is a
combination of the likelihood of suffering harm or
damage during a flood (susceptibility) and the ability
to recover following a flood (resilience). 
Wave energy dissipation  Process by which a wave loses its mechanical
energy. 
Wave overtopping 
Wave overtopping takes place when waves meet a
submerged or emerged reef or structure and pass
over it.

Page 168

Tay Local Flood Risk Management Plan 
Annex 8 | 167 
Annex 8: Licencing & Acknowledgements
The information described in this Annex relates to the Figures and Maps that have
been generated by SEPA and have been reproduced in this Local Flood Risk
Management Plan from the Tay Flood Risk Management Strategy. The Tay Local
Plan District Partners gratefully acknowledge the cooperation and input that various
parties have provided, including inter alia, the following organisations: 
SEPA
Local authorities acknowledge the inclusion of text generated by SEPA in
preparation of the Tay Flood Risk Management Plan. Figures and Maps produced by
SEPA for the Tay Flood Risk Management Plan have been reproduced in the Tay
Local Flood Risk Management Plan with authorisation from SEPA under SEPA
Licence number 100016991 (2022). 
Ordnance Survey
These reproduced maps are based upon Ordnance Survey material with the
permission of Ordnance Survey on behalf of the Controller of Her Majesty’s
Stationery Office © Crown Copyright. Any unauthorised reproduction infringes Crown
copyright and may lead to prosecution or civil proceedings. SEPA Licence number
100016991 (2022). Perth & Kinross Council Licence number 100016971 (2022). 
© Crown copyright and database rights 2022 OS 100016971. You are permitted to
use this data solely to enable you to respond to, or interact with, the organisation that
provided you with the data. You are not permitted to copy, sub-licence, distribute or
sell any of this data to third parties in any form. 
The Centre for Ecology and Hydrology
Some features of these reproduced maps are based upon digital spatial data
licensed from the Centre for Ecology and Hydrology © NERC (CEH) and third party
licensors. 
The Met Office
Data provided by The Met Office has been used by SEPA under licence in some
areas of flood risk information production. ©Crown Copyright (2022), the Met Office. 
The James Hutton Institute
Data provided to SEPA under license from the James Hutton Institute has been
applied in production of flood risk management information. Copyright © The James
Hutton Institute and third party licensors. 
British Geological Survey
Flood risk information has been derived by SEPA from BGS digital data under
license. British Geological Survey ©NERC 
Local authorities
Lead authorities acknowledge the provision of flood models and other supporting
data and information from local authorities in Scotland and their collaboration in the
production of flood risk management information.

Page 169

Tay Local Flood Risk Management Plan 
Annex 8 | 168 
Scottish Water
Local authorities acknowledge the inclusion of surface water flooding data generated
by Scottish Water in preparation of flood risk information.