Flood Risk Management
(Scotland) Act 2009: 
Final Report:
Local Flood Risk Management Plan
Tay Local Plan District 
Published by: Perth & Kinross Council
21 December 2022

Page 2

No embedded text on this page.

Page 3

Foreword
This Final Report on the Tay Local Flood Risk Management Plan shows the progress
made in delivering the actions to avoid and reduce the risk of flooding and prepare and
protect us and our communities across the Local Plan District. The report also marks the
completion of Cycle 1 (2016 - 2022) as we now transition into Cycle 2 (2022 - 2028). 
“The impacts of flooding experienced by individuals, communities and businesses can be
devastating and long lasting. It is vital that we continue to reduce the risk of any such
future events and improve Scotland’s ability to manage and recover from any events which
do occur.”
(Tay Local Flood Risk Management Plan, June 2016) 
The publication of this Final Report shows that the coordinated and collaborative efforts of
public bodies can be brought together to deliver sustainable outcomes. 
This Final Report is published by Perth & Kinross Council on behalf of a partnership
comprising Angus Council, Fife Council, Stirling Council, SEPA, Scottish Water, Loch
Lomond and the Trossachs National Park Authority, Cairngorms National Park Authority
and Scottish Forestry. 
Individuals are the first line of defence against flooding and have responsibilities to protect
themselves from flooding. Through self-help and property level protection, awareness
raising and signing up to Floodline, individuals, businesses and communities can, and
have, made key contributions to the delivery of the actions in the Tay Local Flood Risk
Management Plan, which are detailed in this Final Report. 
Since the publication of the Tay Local Flood Risk Management Plan in June 2016, public
sector finances in Scotland have continued to be under considerable pressure. This places
an even greater responsibility on SEPA, local authorities, Scottish Water and other
responsible authorities to deliver their flood risk management responsibilities and, in
particular the actions in the Plan, to manage flooding in a sustainable way. During Cycle 1,
we have also had to respond to the challenges of the Covid-19 pandemic as well as
significant flood events and staffing shortages. 
SEPA, local authorities, Scottish Water and other responsible authorities will continue to
work collaboratively to implement the actions set out in the Cycle 2 Local Flood Risk
Management Plans to its conclusion in June 2028.

Page 4

We would like to thank all those who contributed to the development of this Report which
will help shape the way in which floods and their impacts are managed across the Tay
Local Plan District. 
Contributors 
Perth & Kinross Council
Angus Council
Fife Council
Stirling Council
SEPA
Scottish Water
Loch Lomond and the Trossachs National Park Authority
Cairngorms National Park Authority
Scottish Forestry
Forestry and Land Scotland
Transport Scotland
Scottish Flood Forum

Page 5

Contents 
Chapter 1 - Background ....................................................................................................... 1
Chapter 2 - Summary of the plan ......................................................................................... 2
2.1 Key Progress in Reducing the Impacts of Flooding since Publication ....................... 2
2.2 How Current is the Plan? .......................................................................................... 4
2.3 Significant Challenges ............................................................................................... 4
2.4 Summary of Actions Not Implemented ...................................................................... 8
2.5 Arrangements Planned to Deliver Remaining Actions ............................................... 9
2.6 Prioritisation of Actions for Next Plan Cycle .............................................................. 9
2.7 Next Steps ............................................................................................................... 10
2.8 Conclusions ............................................................................................................. 11
Chapter 3 - Assessment of Progress of Actions ................................................................ 12
3.1 Progress with General Actions to Manage Flood Risk Across the Tay LPD .............. 13
3.2 Progress with Specific Actions to Manage Flood Risk Within PVAs .......................... 21
3.2.1 Blair Atholl PVA 08/01 .................................................................................. 23
3.2.2 Kinloch Rannoch PVA 08/02 ........................................................................ 26
3.2.3 Aberfeldy and Pitlochry PVA 08/03 ............................................................... 28
3.2.4 Alyth PVA 08/04 ............................................................................................ 32
3.2.5 Kirriemuir & Forfar PVA 08/05 ...................................................................... 36
3.2.6 Blairgowrie PVA 08/06 .................................................................................. 39
3.2.7 Coupar Angus PVA 08/07 ............................................................................. 42
3.2.8 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam PVA 08/08 ......................... 45
3.2.9 Tyndrum and Crianlarich PVA 08/09 ............................................................ 49
3.2.10 Almondbank PVA 08/10 ................................................................................ 51
3.2.11 Scone PVA 08/11 ......................................................................................... 55
3.2.12 Perth to Kinfauns (north of A90) PVA 08/12 ................................................. 58
3.2.13 Perth Centre PVA 08/13 ............................................................................... 62
3.2.14 Comrie PVA 08/014 ...................................................................................... 68
3.2.15 Forteviot PVA 08/15 ...................................................................................... 73
3.2.16 Dunning PVA 08/16 ...................................................................................... 76
3.2.17 Bridge of Earn PVA 08/17 ............................................................................. 79
3.3 Other Actions ............................................................................................................. 83
List of Acronyms and Abbreviations ................................................................................... 85
Annex 1: FRM Responsibilities & Legal Requirement for this Interim Report .................... 86

Page 6

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 1|1
Chapter 1 - Background 
This Final Report is a legal requirement of the Flood Risk Management (Scotland) Act
2009 (Section 38) and, following recent Ministerial Direction, is required to be published no
later than 31 December 2022. The Final Report includes: 
• An assessment of the progress made towards implementing the Tay Local Flood
Risk Management Plan published in 2016 (the ‘Plan’).
• a summary of the planned actions which were not implemented, with reasons for
their non-implementation; and
• a description of any other actions implemented since the plan was finalised which the
lead authority considers have contributed to the achievement of the objectives. 
Further details on flood risk management responsibilities in Scotland and the legal
requirement for the publication of this Final Report can be found in Annex 1. 
A copy of the published Tay Local Flood Risk Management Plan can be found at the
following link: 
www.pkc.gov.uk/frmplans

Page 7

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|2
Chapter 2 – Summary of the Progress of Actions in the Plan
This section sets out a summary of the progress of actions as detailed in the published
Tay Local Flood Risk Management Plan. It draws upon the assessment of progress of
actions presented in the subsequent Chapter 3. 
A summary of the planned actions which were not implemented, with reasons for their
non-implementation is provided in Section 2.4. 
A description of the other actions implemented since the Plan was finalised which have
contributed to the achievement of the objectives is provided in Sections 2.2 and 3.3. 
2.1 Key Progress in Reducing the Impacts of Flooding since Publication 
The following key progress has been made on the actions set out in the published Tay
Local Flood Risk Management Plan: -  
• Partnership Working - the introduction of the Flood Act had resulted in a more
modern and coordinated approach to flood risk management and SEPA and
responsible authorities were working more closely together than ever before.
However, the Covid-19 pandemic, remote working and the SEPA cyber-attack of
December 2020 have had an impact on the FRM planning process as well as
various on-going projects. While the vast majority of these issues have now been
resolved, the delays to Cycle 1 work will have an impact on the delivery of actions in
Cycle 2.
• Overall Progress – following a slow start, good progress was made on the identified
actions across the Tay Local Plan District (LPD). However, progress has been
significantly affected by the Covid-19 pandemic, staffing shortages and the severe
flooding experienced in many areas of the Tay LPD in August 2020 and September
2022. Out of the 182 selected actions, 156 have a green status, 22 amber and 4
actions have a red status. This is very similar to the overall status at the time of the
Interim Report in March 2019. The majority of actions have a green status, and the
majority of the remaining actions will continue into and be delivered within Cycle 2,
as set out in Chapter 3 of this report.
• Almondbank Flood Protection Scheme - substantially completed in September 2018
benefitting 31 homes and 48 businesses.
• Comrie Flood Protection Scheme – confirmed in August 2021; construction works
commenced in late August 2022.
• Perth Integrated Catchment Study - Scottish Water and Perth & Kinross Council
worked in partnership to complete a city-wide model. Further investigations have
been concluded in high priority areas.
• Flood Studies –

Page 8

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|3
o Studies in Pitlochry, Aberfeldy, Dunkeld, Kirriemuir and Forfar have been
completed and have identified flood risk management measures within these
towns.
o Work to develop the Perth Surface Water Management Plan is underway.
o In Perth, the Craigie Burn Flood Study is also underway.
o The Alyth Natural Flood Management Study is underway.
o Work to develop the Blairgowrie & Rattray Surface Water Management Plan
is underway.
o Work to design flood protection works at Bridgend, Perth in on-going.
o The Scone Flood Protection Study and Surface Water Management Plan will
commence early 2023.
• Flood Mapping and Modelling Improvements - a number are on-going in the Tay
Local Plan District by SEPA and other organisations. This will continue to improve
the understanding of flood risk across this area.
• Flood Forecasting - SEPA has continued to improve the Scottish Flood Forecasting
Service with the Met Office, with daily Flood Guidance Statements and regional
Flood Alerts issued as required to enable communities Category 1 and 2 agencies
(such as emergency responders, local authorities and other organisations with
flooding management duties) to reduce the impacts of flooding. SEPA, in
partnership with the Met Office, has developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast, to provide better and earlier
information to the public. Options for developing forecasts of surface water flooding
have been published in 2022 to help urban areas and the transport network
improve their resilience to and preparedness for flooding. SEPA has also continued
to provide a flood warning service to a number of locations within the Tay Local
Plan District. 
• Self Help - Perth & Kinross Council’s Housing Service has rolled out property flood
protection measures for 90 Council properties in Aberfeldy, Alyth, Comrie, Kinross
and Perth.
• Awareness Raising - Community engagement and awareness raising activities
have been carried out across the Tay Local Plan District, specifically in Potentially
Vulnerable Areas (PVA’s) where significant actions are underway or have been
undertaken (i.e., flood studies and schemes).
• Maintenance - local authorities have continued to assess watercourses and carry
out clearance and repair works where such works would substantially reduce flood
risk. They have also continued to maintain existing flood protection schemes and
defences. Scottish Water has continued to undertake risk based inspection,
maintenance and repair on the public sewer network.
• Emergency Plans/Response - Perth & Kinross Council further developed its
Flooding Emergency Response Plan to take more account of the areas at highest
risk of flooding and the severe flooding of August 2020. This included a review of
out of hours emergency arrangements and flood gate closures.
• Planning Policies - Planning authorities have continued to apply existing planning
policies and SEPA and Scottish Water have provided flood risk advice with a view
to avoiding flood risk.

Page 9

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|4 
2.2 How Current is the Plan? 
The Tay Local Flood Risk Management Plan was published in June 2016 to supplement
the Tay Flood Risk Management Strategy published by SEPA in December 2015. The
Plan detailed how the actions identified in the Strategy were to be implemented over the
period from 2016 to 2022. The Strategy and Plan were based on the National Flood Risk
Assessment and the designated PVAs at that time. 
Since the identification of the actions in the Plan, there have and continue to be
advancements in our knowledge and methods of assessment. These include the
publication by SEPA of an updated National Flood Risk Assessment and PVAs in
December 2018 and the subsequent introduction of Objective Target Areas. These
advancements may continue to inform the delivery of the actions in the Plan and will be
used in the development of future Strategies and Plans. 
It is therefore considered that this is the Final Report for the current Tay Local Flood Risk
Management Plan, albeit the planned delivery and actual delivery dates have changed for
some actions.  This is further detailed in Chapter 3 of this report. 
2.3 Significant Challenges 
Based on a review of the progress of actions detailed in this Final Report, the following key
challenges and issues have had an impact on the delivery of actions to manage flood risk.
Arrangements planned to deliver the remaining actions are described below. Where these
challenges have had an impact on the delivery of specific actions or actions across the
Local Plan District, this is detailed in Chapter 3. 
The overall delivery of actions in the Plan has not been impacted by funding, although
significant resource issues have been noted. 
Significant Weather Events 
The Tay LPD was adversely affected by significant weather events in late 2015 and early
2016 (Storms Desmond and Frank), which had knock on impacts on the delivery of actions
in the Plan from June 2016 onwards. For example, Perth & Kinross Council and Angus
Council resources were deployed to deal with the emergency events at that time as well as
the follow up activities and necessary works, which were still being delivered into the
2020/21 financial year. This has caused consequential delays in the planned delivery of
some actions as staff resources that would have been delivering planned actions have
been delivering emergency actions.

Page 10

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|5 
A further significant weather event affecting the Tay LPD was the ‘Beast from the East’
which resulted in extremely low temperatures and high levels of snow fall across much of
the Plan area in March 2018.  Fortunately, there was not much significant flooding
associated with this event, as a gradual thaw limited the impacts of snowmelt. 
Significant flooding occurred during the storm of 11/12 August 2020 and a number of
smaller flood events in the months that followed. This has had a considerable impact on
the delivery of planned actions, as Councils had to divert significant resources to deal with
the aftermath of the flooding. This was the most severe flood event in Perth & Kinross in
almost 30 years and occurred during the Covid-19 pandemic (see below). The response
made up a significant proportion of Perth & Kinross Council flooding team’s workload for a
year following the initial flood event. The Scottish Flood Forum provided support to
responsible authorities and local communities who sadly flooded during this extreme
weather event. Despite covid lockdown restrictions, the Scottish Flood Forum were still
able to provide individual and group support, both face to face and online, by delivering
recovery consultations, household property flood resilience assessments, community
resilience group start-up advice and support for local authorities and key stakeholders with
online community information events. Key topics covered included insurance,
reinstatement, and future property flood resilience. 
Further significant flooding occurred in Perth and some surrounding areas on 8 September
2022. This led to further delays to the delivery of planed actions as well as the
development of this Final Report and the Cycle 2 Tay Local Flood Risk Management Plan. 
Arrangements planned to deliver the remaining actions affected by significant weather
events are described below and in Chapter 3. 
Covid-19 Pandemic 
The Covid-19 pandemic has impacted the delivery of Cycle 1 actions including a
requirement to suspend flood risk management construction works as part of the national
effort to minimise the spread of the virus during the first national lockdown.  The pandemic
also disrupted flood risk management studies, schemes and flood modelling work due to
the transition to home working and the challenges of effectively consulting and engaging
with flood affected communities.  The pandemic resulted in flooding staff being redeployed
elsewhere to assist with Covid response efforts. These impacts have resulted in higher
implementation costs and programme delays. 
Funding 
“The lists of prioritised actions to meet agreed goals and objectives in the first six-year
cycle considered what would be achievable assuming a similar level of funding for flood
risk management activities from The Scottish Government. However, given the timing of
spending reviews and annualised financial settlements for local government, the actual
ability to deliver all the actions set in the Strategies in December 2015 and detailed in this

Page 11

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|6
Plan will be dependent on the availability of the necessary funding in each year of the six
year Plan.” 
(Tay Local Flood Risk Management Plan, June 2016). 
The level of funding from Scottish Government for flood risk activities for the first years of
the six-year Plan has generally been at the levels anticipated. 
However, the Scottish Government and CoSLA are undertaking a review of capital funding
for flood risk management.  At present funding is available for the Council’s proposed flood
scheme in Comrie and work on this continues. However, as a result of the funding review,
the proposed flood scheme, on the Annaty Burn in Scone, has been paused. While this
scheme will still progress in the future, it may take longer to implement due to these
funding limitations. The conclusion of the national review into capital funding for flood risk
management is awaited. A statement on funding is awaited from the Scottish Ministers. 
Allocation of Resources 
The availability and retention of skilled and experienced staff to deliver flood risk actions
has been a very limiting factor. Much of this human resource pressure has arisen from the
increased level of investment in flood risk management across the country, leading to
pressure on the limited pool of those with the required specialist technical skills. 
This pressure has not only been observed within the authorities responsible for
progressing individual actions, but also within the consulting engineers engaged to support
the development of solutions. 
The increased workload created by the Covid-19 pandemic and the significant weather
events noted above has put more pressure on those limited staff resources. This has
caused consequential delays in the planned delivery of actions. 
Arrangements planned to deliver the remaining actions affected by allocation of resource
issues are described below and are detailed in Chapter 3. 
Procurement and Use of Consulting Engineers and Contractors 
The availability of consulting engineers has been a limiting factor in some areas. In the
period following publication of the Plan, Perth & Kinross Council were initially unable to
engage consulting engineers and underwent repeated procurement exercises. The market
response to tender opportunities has since improved. 
The Council has also encountered some initial issues in engaging site supervision staff for
the Almondbank Flood Protection Scheme and, more recently, project management staff
for the Comrie Flood Protection Scheme. These resource issues have caused
consequential delays in the planned delivery of actions and have led to increased costs. 
Arrangements planned to deliver the remaining actions affected by the use of consulting
engineers are described below and are detailed in Chapter 3.

Page 12

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|7 
SEPA Cyber-Attack 
On 24 December 2020, SEPA was subject to a serious and complex cyber-attack, which
significantly impacted the organisation, staff, public and private partners, and the
communities who rely on SEPA’s services. Since the attack, SEPA has worked with the
Scottish Government, Police Scotland, the National Cyber Security Centre (NCSC) and
the Scottish Business Resilience Centre (SBRC) to a clear recovery strategy. The incident
has, however, temporarily impacted progress on a number of actions such as new flood
warnings, mapping and modelling projects and some engagement activities. Many of
these projects are still going ahead but the timescales for them have been adjusted. 
Arrangements planned to deliver the remaining actions affected by the use of consultants
are described below and are detailed in Chapter 3. 
Other Actions 
Perth & Kinross Council has carried out additional actions, outwith the actions identified
within the Tay Local Flood Risk Management Plan.  These actions include: 
• Delivering on previous commitments to complete investigations into flood schemes
(at Comrie, Bankfoot and Coupar Angus) and carrying out the associated public
consultation events in late 2016.
• Riverbank erosion protection works, as well as repairs to a surface water outfall,
have been carried out on the River Almond at Inveralmond, Perth.
• Works to address surface water flooding have been carried out at Perth Harbour.
• The completion of previous flood study work for the small burns to the southeast of
Pitlochry in the vicinity of Middlehaugh of Dalshian, Easthaugh of Ballyoukan and
the Altrory Burn.
• Works to install a sheet piled cut off wall to prevent ground water seepage during
future flood events have been completed on the North Muirton Flood embankment.
• In response to the severe flooding of 11 & 12 August 2020:
o A coordinated response from various Council services and partner
organisations involving investigations, advice and support. 
o Continued work with public agencies and local resilience groups to investigate
and respond to the impact of the flooding, focusing on homes and businesses
most affected. 
o Responses to over 650 enquiries received via the Council’s dedicated web
page and generic e-mail address.
o Nine online community meetings were held.
o On the ground works in the most affected areas to respond to, and support,
emergency works.

Page 13

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|8
o Emergency clearance works on the Craigie Burn, the Alyth Burn and the
Dunning Burn.
o CCTV camera surveys of drainage systems and culverts.
o Works to make safe a collapsed retaining wall on the Deich Burn in Bridge of
Earn.
o A report to the Council’s Environment and Infrastructure Committee on 18
August 2021, including a summary of identified short, medium, and long-term
actions. These actions were consistent with the Tay Local Flood Risk
Management Plan. 
o A review of the Council’s Out of Hours Emergency Service and flood gate
closure procedure.
• In November 2020, Scottish Water and the Council carried out the replacement of
all 8 pumps (4 foul & 4 surface water) in the South Inch Pumping Station, as part of
planned maintenance work. The remaining pumps and telemetry systems on the
Perth Flood scheme between Inveralmond and South Inch, were replaced over the
last year. 
Further details on these actions are provided within Section 3.3 of this document. 
2.4 Summary of Actions Not Implemented 
The significant challenges set out in Section 2.3 have resulted in delays to some planned
actions and as a result, some actions have not yet been implemented, or may not be
implemented at all.   
The following four actions were not implemented during Cycle 1 (2016 - 2022): 
Tyndrum & Crianlarich PVA 08/09
Action ID Delivery
Lead
Planned
Dates
Reasons Why Action Not Implemented
Strategic
Mapping
and
Modelling
(80410016) 
SEPA 2018-
2019
A detailed screening exercise has been undertaken to
identify those outstanding modelling and mapping
actions with potential multi benefits for Flooding, River
Basin Management Planning 2027 priorities and
development pressures. The outcome of this review
has indicated that this catchment is not within a 2021
Objective Target Area and doesn't provide any
multiple benefits. A decision has therefore been made
not to progress this action any further.

Page 14

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|9
Scone PVA 08/11
Action ID Delivery
Lead
Planned
Dates
Reasons Why Action Not Implemented
Flood
Protection
Scheme/
Works
(80230006)
Perth &
Kinross
Council
2018-
2021
The Council’s programme of flood protection schemes
has been delayed due to the reasons listed in Section
2.3 of this Final Report.
The flood protection scheme was programmed for
completion in 2024/25, but that is now subject to
capital grant funding.
Flood
Protection
Study
(80230005)
Perth &
Kinross
Council
2020-
2022
The Council’s programme of flood studies has been
delayed due to the reasons listed in Section 2.3 of this
Final Report. However, the Scone Flood Protection
Study is programmed for completion in the 2023/24
financial year.
Surface
Water
Plan/
Study
(80210018)
Perth &
Kinross
Council
2020-
2022
The Council’s programme of flood studies has been
delayed due to the reasons listed in Section 2.3 of this
Final Report. However, the Scone surface water
management plan is programmed for completion in
the 2023/24 financial year. 
As these four actions have not been completed in Cycle 1, they have been allocated a red
RAG status in Chapter 3. However, three out of the four actions listed (in the Scone PVA
08/09) will be delivered in Cycle 2. Further information on these actions can be found in
Chapter 3. 
2.5 Arrangements Planned to Deliver Remaining Actions 
The actions in the Plan will continue to be delivered over the reminder of the Cycle 2
period from 2022 to 2028. This will be as per the published Plan, subject to revisions in
delivery dates as detailed in Chapter 3 of this Final Report. 
In general, most of the remaining actions in the Plan will be delivered in Cycle 2, subject to
funding. Where specific measures are required to address a delay and ensure an action is
completed then this is described against the relevant action.  In addition, where remaining
actions have not been delivered, planned contingencies have been considered, which are
described against the relevant action. 
2.6 Prioritisation of Actions for Next Plan Cycle 
Any actions that were not put forward for inclusion in the next Tay Local Flood Risk
Management Plan by December 2019 have been deferred for consideration until Cycle 3
(2028-2034). The background to this is explained below. 
Many actions contained in the current Plan involve undertaking investigations (e.g., flood
studies) to assess the need for further action to manage flood risk. If further action is found
to be required, then it may be implemented in a future Local Flood Risk Management Plan.

Page 15

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|10
For example, a flood protection study may recommend that a community flood action
group is set up to increase resilience to flooding, or that flood defences are constructed.
The community flood action group or flood defences may be implemented as part of the
next Local Flood Risk Management Plan covering the period between 2022-2028. 
However, for any new actions to be considered and included in the next Local Flood Risk
Management Plan (from 2022-2028), the responsible authorities had to fully detail and
submit them for consideration as actions. The deadline date for the submission of such
actions to SEPA was set as December 2019. Any actions submitted have been assessed
and prioritised against the FRM objectives and were consulted upon ahead of the
publication of the second cycle of Flood Risk Management Plans in December 2021 and
Local Flood Risk Management Plans in December 2022. Any actions that missed the
December 2019 deadline have been deferred for consideration until the third cycle of
Plans covering the period from 2028-2034. 
2.7 Next Steps 
This Final Report on the Plan will be published by 31 December 2022 and marks the
completion of Cycle 1 (2016-2022) and the commencement of Cycle 2 (2022-2028) of the
on-going flood risk management planning process. 
The Tay Flood Risk Management Plan has been updated for Cycle 2 and was published
by SEPA in December 2021 and can be accessed at: 
www2.sepa.org.uk/frmplans/documents/lpd8-tay-frmp-2021.pdf 
The Cycle 2 Tay Local Flood Risk Management Plan is scheduled to be published by 31
December 2022. 
In the meantime, to find out more about how flood risk is being managed please refer to
your local responsible authority’s website: 
Angus Council Website - Flooding  
Fife Council - Flooding  
Perth & Kinross Council - Flooding  
Stirling Council - Flooding  
Scottish Environment Protection Agency (SEPA)
Scottish Water
Scottish Forestry
Cairngorms National Park Authority
Loch Lomond & The Trossachs National Park Authority
Transport Scotland
Scottish Flood Forum

Page 16

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 2|11
2.8 Conclusions 
This report sets out as assessment of progress made towards implementing the actions
set out in the published Tay Local Flood Risk Management Plan. The report also sets
out a summary of any actions that have not been implemented, with reasons for their
non implementation, and a description of other actions implemented since the Plan was
published.  
The introduction of the Flood Act has initially led to improved partnership working and
data sharing between SEPA and the responsible authorities. However, this has been
affected by the Covid-19 pandemic and the cyber-attack on SEPA.
The published Tay Local FRM plan has remained current and relevant. Since its
publication in June 2016, in general good progress had been made over the first 4 years
of the first cycle, despite a relatively slow start. Progress on the initial actions was
delayed by the response required to Storms Frank and Desmond, the staff resources
required to complete investigations into flood schemes (in Comrie, Bankfoot and Coupar
Angus) and the procurement of sufficient consultancy services initially also proved
problematic. However, with relatively few flood events between early 2016 and 2019,
more steady progress was made in delivering the selected actions. However, this
changed in March 2020 with the start of the national Covid-19 lockdowns, and the
severe flooding of August 2020 further exacerbated this situation. 
All of the identified flood studies are complete or are currently on-going, with only two to
be commenced. The progress on the larger and more complex flood protection
schemes has been further delayed. However, a large flood protection scheme in
Almondbank was substantially completed in 2018 and the construction of a major flood
scheme in Comrie has commenced.
The delivery of the actions set out in the Cycle 1 Plan has reduced flood risk and
informed future actions that will reduce flood risk in subsequent cycles. 
It should be noted that the responsible authorities involved in delivering the actions for
the Tay LPD are also involved in delivering actions in other local plan districts and their
resources have been split accordingly.

Page 17

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|12
Chapter 3 - Assessment of Progress of Actions 
This section sets out an assessment of the progress made towards implementing the
actions set out in the Plan. 
There are actions that apply across the whole of the Tay Local Plan District and actions
that are specific to each of the 17 PVA’s (as defined under Section 13 of the Act) within
the Tay Local Plan District, which are shown below in Figure 1. 
Figure 1: The Tay Local Plan District with Potentially Vulnerable Areas
(Reproduced from Tay Flood Risk Management Strategy, SEPA, December 2015) 
The actions that apply across the Tay LPD are shown in Tables 1 and 2 while the actions
that apply to individual PVAs are summarised in Table 3. 
The summary of the assessment of progress is shown using the traffic light system, where
each item is marked as Red, Amber or Green (RAG) and where: 
• GREEN – Action has been completed.
• AMBER – Action has commenced but has not progressed as quickly as the planned
delivery period in the Plan.
• RED – Action has not commenced.

Page 18

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|13
3.1 Progress with General Actions to Manage Flood Risk Across the Tay LPD 
This section sets out an assessment of the progress made towards implementing the
actions that apply across the whole of the Tay Local Plan District over the six-year Plan.
This assessment is presented in Table 1 below. 
Table 1: Summary of Progress for General Actions to Manage Flood Risk that Apply
Across the Tay Local Plan District
Action RAG Status
Flood Forecasting G
Self Help G
Awareness Raising G
Maintenance G
Emergency Plans / Response G
Planning Policies G 
These general actions are also set out in more detail in Table 2 below which provides
further information including the RAG Status; who is responsible for the delivery and
implementation of the actions; the progress made and the work to be undertaken to
complete the action.

Page 19

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|14
Table 2: Progress with General Actions to Manage Flood Risk that Apply Across the Tay Local Plan District 
Action (ID) RAG
Status
Description Delivery
Lead
Progress Made Planned Actions to Complete
FLOOD
FORECASTING
(80410009)
G The Scottish Flood Forecasting Service is a joint
initiative between SEPA and the Met Office that
produces daily, national flood guidance statements
which are issued to Category 1 and 2 Responders.
The flood guidance statements provide an
assessment of the risk of flooding for a five day
period allowing responders time to put preparations
in place to reduce the impact of flooding.  The
service also provides information which allows
SEPA to issue flood warnings, giving people a
better chance of reducing the impact of flooding on
their home or business. For more information,
please visit SEPA’s website.
SEPA SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood Alerts
issued as required to enable communities and
responders to reduce the impacts of flooding. SEPA in
partnership with the Met Office has developed a public
version of the daily Flood Guidance Statement, the
Scottish Flood Forecast, to provide better and earlier
information to the public. A beta version of this product
was launched in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their resilience
to and preparedness for flooding.
The Scottish Flood Forecast will be refined in the
wake of user feedback. A more focussed version
of the product, producing guidance at a local
level, is planned for the next flood risk
management cycle. 
The development and wider roll-out of surface
water flooding forecasts is being considered
alongside the technical, resource and
communication challenges associated with
providing surface water flooding guidance.
SELF HELP
(80410011)
G Everyone is responsible for protecting themselves
and their property from flooding. Self-help actions
can be undertaken by any individuals, businesses,
organisations or communities at risk of flooding.
They are applicable to all sources, frequency and
scales of flooding. They focus on awareness
raising and understanding of flood risk. 
Property and business owners can take simple
steps to reduce damage and disruption to their
homes and businesses should flooding
happen. This includes preparing a flood plan and
flood kit, installing property level protection, signing
up to Floodline and Resilient Communities
Initiative, and ensuring that properties and
businesses are insured against flood damage.
- Local authorities have engaged and supported their
local communities to become more resilient to
emergency situations, including flood events. Advice
has been given on how to prepare for flooding, install
property level protection and the Resilient Communities
Initiative. 
In Perth & Kinross, communities have been engaged
through the multi-agency Local Resilience Partnership
Community and Business Resilience Group, led by the
Council. The Council’s Housing Service has taken
action to protect 90 Council properties within Aberfeldy,
Alyth, Kinross, Comrie and Perth. Further details are
provided within the relevant areas of Section 3.2 of this
report. The Council also provided a considerable
amount of advice and assistance following the severe
flood events of 11/12 August 2020 and 8 September
2022.
Angus Council’s Roads supervisors have been advised
of the corporate message on flooding and the Council’s
Flood Team seek feedback from them following flood
incidents to assess the impact of Council’s message
and actions.
Stirling Council’s Resilience team are able to work with
communities to develop community resilience plans. If a
resilience group exists, Stirling Council have committed
to providing a flood pod as part of flood risk
management, where materials can be stored and
distributed. Stirling Council’s flood team, in conjunction
with the resilience team, host annual online information
sessions on resilience groups.
The Scottish Flood Forum provided support and advice
to 5 communities (Bankfoot, Aberfeldy, Alyth,
Blairgowrie and Comrie) to help people protect
themselves and their property. This includes advice to
Local authorities will continue to support
communities to become more resilient to flooding
and to develop community resilience groups and
emergency plans.
Perth and Kinross Council’s Housing Service will
undertake a review of properties and areas that
have experienced recent flooding to consider the
installation of further property flood protection
products. This will be supported by
communications via the Council’s social media
platforms to raise awareness and let tenants
know where they can find information. The
Housing Service will support and encourage
tenants to be prepared in advance of flooding.

Page 20

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|15
residents on PLP assessments and advice on
insurance and developing community resilience to
prepare for flooding. The Forum continues to:
• Promote FloodRE affordable insurance and the Build
Back Better insurance initiative. 
• Support the Property Flood Resilience (PFR) Delivery
Group that aims to mainstream PFR and help
property owners take action to make their properties
more resilient against the impacts of flooding.
• Offer independent impartial advice on the Property
Flood Resilience and promote the CIRA standards
and code of practice on PFR. This includes the
Forum’s PFR assessments to individuals,
communities and agencies who request support.  
AWARENESS
RAISING
(80410013)
G Public awareness, participation and community
support are essential components of sustainable
flood risk management. SEPA and the responsible
authorities have a duty to raise public awareness of
flood risk. This is undertaken both individually and
collaboratively by a range of organisations. 
Improved awareness of flood risk and actions that
prepare individuals, homes and businesses for
flooding can reduce the overall impact. From 2016
SEPA will undertake flood risk education and
awareness raising activities. In addition, SEPA will
engage with community resilience groups and
participate in property level protection events
delivered by the Scottish Flood Forum where
possible. 
Across Scotland, SEPA will create and share
communication and education resources with other
responsible authorities. These resources will
include awareness campaigns, media and
marketing activity and promotion of SEPA's flood
forecasting and warning services (Floodline).
Where they exist, SEPA will engage with
community resilience groups and community safety
partnerships. 
Local authorities will be undertaking additional
awareness raising activities when developing any
specific project proposals and will engage with
community resilience groups and local
communities.  As a responsible authority, Scottish
Water will support SEPA and responsible
authorities with awareness raising activities as
required and provide targeted flooding
communications for Scottish Water specific
activities. Scottish Water will raise awareness by
producing and supplying targeted information to
the public on large capital projects and detailed
local studies. More general information and
flooding guidance will be available on the website
Responsible
authorities
SEPA continued to raise awareness of flood risk
through campaigning, developing education and
engagement tools, creating new partnerships, and
improving the flood warning and forecasting service.
Many of SEPA's awareness raising activities will
continue. The focus will be on promoting the flood
warning and forecasting service, innovation, education
and engagement with partners, customers and the
public.
Local Authorities have undertaken awareness raising
activities around specific project proposals and have
engaged with community resilience groups and local
communities. Local authorities have also developed
their websites and social media to provide more advice
and information on flood risk management. Those local
authorities affected by the flooding of August 2020 and
September 2022 also provided a considerable amount
of advice to raise awareness of flood risk in affected
communities.
Stirling Council use SEPA’s flood alerts to deliver
targeted flood awareness information. The Council are
developing an annual programme of attending local
events to deliver awareness raising objectives. The
Council also works with the Scottish Fire and Rescue
Service to deliver joint flooding messages at annual fire
station open days.
Scottish Water support SEPA and responsible
authorities with their awareness raising activities as
required and provide targeted communications for
Scottish Water sewer flooding programme activities. 
Scottish Water raise awareness by producing and
supplying targeted information to the public on large
capital projects and detailed local studies.
Scottish Forestry (SF) continues to engage with
responsible authorities to make sure that the
contribution of woodlands and forestry is recognised
when natural flood management measures are
promoted. Interactions with the public are sought at
Local Authorities will continue with awareness
raising activities when developing proposals for
the remaining actions in the Tay Local Flood Risk
Management Plan.
Stirling Council will continue its efforts to increase
the number of active local flood groups in the
Stirling Council area, as well as ensuring existing
groups are adequately supported to remain
viable and active.
Scottish Water are continuing to support SEPA
and Local Authorities in their awareness raising
activities. General awareness raising is carried
out through the Scottish Water website and
national advertising campaigns to increase public
awareness of the implications of their actions on
sewer flooding. For site specific capital projects
and local studies, targeted public engagement is
being carried out at a local level.
Scottish Forestry will continue to:
i) improve their regional knowledge on flood
risk and the PVAs. 
ii) identify opportunities for forestry projects
across the country.
iii) engage with local communities through the
revision of Land Management Plans.

Page 21

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|16
at https://www.scottishwater.co.uk/you-and-your-
home/your-home/flooding-information.
public National events (for example the Royal Highland
Show) and regional/local events (for example the Turiff
Show) to highlight the role that trees, and woodland
have in contributing to managing flood risk. This
includes working with facilitators (from the charitable
sectors and businesses) to help partnership initiatives
that aim to improve public resilience to flood risk and to
make sure that the communities have access to
information and help/support. SF continue to work on
partnership initiatives to spatially identify where
woodland can be planted and managed - these include
the local communities. Forest Enterprise Scotland (the
agency of Forestry and Land Scotland Scotland)
engages with communities, NGOs and statutory
stakeholders on the revision of Land Management
Plans. Flooding is part of these catchment-focused
discussions where SF’s planners raise awareness of
the benefits that trees and forestry can bring to flooding
and the associated reduction of peak flows through: -
1) Evaporation of rainfall from canopy and. 
2) Transpiration of heavy rain into the forest soils and
geology.
Following the August 2020 flooding, the Scottish Flood
Forum has raised awareness within four affected
communities (Perth, Dunning, Kinross and Alyth) by
answering 86 individual queries and arranging 5 mobile
surgeries. The Forum continues to support awareness
raising activities to increase understanding of flood risk
and flood risk management actions with communities
and agencies. The Forum continues to engage flood
risk communities and partners through their community
newsletter and peer to peer networking events to build
links and share experience on key flood risk
management issues.   
MAINTENANCE 
(80410007)
G Local authorities have a duty to assess
watercourses and carry out clearance and repair
works where such works would substantially
reduce flood risk. They produce schedules of
clearance and repair works and make these
available for public inspection. Scottish Water will
undertake risk based inspection, maintenance and
repair on the public sewer network. Asset owners
and riparian landowners are responsible for the
maintenance and management of their own assets
including those which help to reduce flood risk.
Section 18 and 59 of the Flood Risk Management
(Scotland) Act 2009 place duties of watercourse
assessment, clearance and repair on local
authorities. In addition, local authorities may also
be responsible for maintenance of existing flood
protection schemes or defences.
Local
Authority,
asset / land
managers 
Local authorities have continued to inspect and assess
watercourses and carry out clearance and repair works
where such works would substantially reduce flood risk.
This has included producing schedules of clearance
and repair works and making these available for public
inspection.
In Perth & Kinross, the Council’s routine watercourse
inspections are a carried out either annually, six
monthly or quarterly, depending on the flood risk
associated with each watercourse.  Further reactive
inspections have been carried out when issues have
been highlighted or during times of flooding. Where a
flood risk is identified, and clearance and repair works
would substantially reduce that flood risk, then those
works are included on the Council's clearance and
repair schedule and carried out. 
Significant examples of clearance and repair works are
noted within various PVAs in this report. Culvert
Local authorities will continue to inspect and
assess watercourses and carry out clearance and
repair works where this would substantially
reduce flood risk. Reactive maintenance will also
continue to be undertaken where issues are
identified.
Perth & Kinross Council will also continue to
maintain the formal flood schemes within its area,
as per the existing inspection and maintenance
regime. Road gullies will continue to be monitored
and cleared as per the gulley monitoring
programme.
Stirling Council will continue to inspect
watercourses to identify flood risks and to carry
out the regular inspection and clearance regime
of identified sensitive assets which has resulted in
a reduction in localised and repeat flooding
incidents. Budgets have however been reduced

Page 22

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|17
replacement works were also carried out at Westhaugh
of Dalshian, Pitlochry in 2016. A significant amount of
emergency clearance works (on the Craigie Burn, Alyth
Burn and the Dunning Burn) were carried out following
the August 2020 flood. Emergency works were also
carried out to make safe a collapsed retaining wall on
the Deich Burn in Bridge of Earn. 
The Council has also continued to inspect and maintain
existing flood protection schemes.
Perth & Kinross Council also operates a monitoring
programme for the inspection and maintenance of road
gullies. Each gulley is inspected, and cleared if
required, once per year. The monitoring programme
identifies gullies that are more at risk from blockage so
that they can be checked more frequently. It also
enables the Council to reduce the frequency of
inspections where gullies are found to require less
frequent maintenance. Through this monitoring, the
Council is developing a more strategic and sustainable
approach to gully maintenance.  The public can also
contact the Council to highlight issues with any road
gullies.  
In Angus, the Council’s maintenance contract is let and
managed on yearly basis. Reactive maintenance is also
undertaken where issues are identified.
Stirling Council has a successful watercourse
inspection regime in place which identifies risks. Where
the problems reside in private property the Council
notifies landowners of their riparian responsibilities. A
letter will be sent to landowners to inform them of the
need to undertake works, as well as the grading and
risk of identified obstructions within the watercourse. If
the flood risk will affect any roads, an enforcement letter
can be issued under the Roads (Scotland) Act 1984.
The Council also has a maintenance regime in place
where key hot spot locations of assets such as
grilles/inlets have been identified and are inspected at a
regular frequency. This work is carried out by
contractors and managed by the Council’s flooding
team. Any additional works identified are added to a
schedule of works and prioritised based on risk and the
available budget.
Scottish Water have carried out risk-based inspection,
maintenance and repair on the public sewer network.
therefore the volume of clearance and repair
works have reduced. Maintenance will continue to
be carried out on a risk-based approach and
cyclic maintenance scheduled on assets at time
intervals based on risk posed/known sites of
interest or known issues. There is an annual
consideration and refinement in maintenance
schedules. The Council will continue to seek
methods of continuing a sustainable level of
maintenance activities through resilience groups
and a risk-based approach to asset management. 
Scottish Water will continue to carry out risk-
based inspection, maintenance and repair on the
public sewer network 
EMERGENCY
PLANS /
RESPONSE
(80410014)
G Providing an emergency response to flooding is the
responsibility of many organisations, including local
authorities, the emergency services and SEPA.
Effective management of an emergency response
relies on emergency plans that are prepared under
the Civil Contingencies Act 2004 by Category 1
and 2 Responders. The emergency response by
these organisations is coordinated through regional
Category 1
and 2
Responders
Local authorities have developed emergency plans.
Perth & Kinross Council further developed its Flooding
Emergency Response Plan to take more account of the
areas at highest risk of flooding and the severe flooding
of August 2020. The Plan is designed to ensure that
contingency measures are in place for a coordinated
and flexible response to flooding incidents to mitigate
the effects of flooding emergencies on people, property
Local authorities will continue to review, develop
and implement their emergency plans.
Where no incidents have occurred in Perth &
Kinross within a 12-month period a tabletop
exercise will be conducted to test the response
plan. This exercise may include consideration of
flooding incidents, severe weather, widespread
flooding, storm events, etc.

Page 23

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|18
and local resilience partnerships. This response
may be supported by the work of voluntary
organisations. Emergency response plans are
applicable for all types of flooding. They set out the
steps to be taken during flooding in order to
maximise safety and minimise impacts where
possible. Under the Civil Contingencies Act,
Category 1 Responders have a duty to maintain
emergency plans. Emergency plans may also be
prepared by individuals, businesses, organisations
or communities. 
Scottish Water is a Category 2 responder under
the Civil Contingencies Act 2004 and will support
regional and local resilience partnerships as
required.
and infrastructure. During recent flood events, the
Council’s Housing service has worked with Tayside
Contracts to provide sandbags to tenants and residents
within housing localities and provided wellbeing checks
and support for tenants who have been at risk or
affected by flooding. The Council’s Housing Repairs
Centre set up flooding FAQ’s and is able to advise and
support tenants calling at the time of flood events.         
Angus Council has developed emergency plans that
take account of new information received and the plans
are constantly under review.  Angus Council continue to
support resilience partnerships whenever requested to
do so.
Over and above civil contingencies planning, in June
2017 Stirling Council established a formal Flood
Partnership Group between the Scottish Fire & Rescue
Service, the Scottish Flood Forum, SEPA, Emergency
Planning Officers and the flooding teams from each
Local Authority and Scottish Water. There is potential to
expand the working group to include other agencies or
the voluntary sector. The group continued to operate
until March 2021 but ceased during the covid
pandemic.
Fife Council’s updated Flood Emergency Plan was
published in November 2016 and will be updated again
in 2023-24.  
As a Category 2 Responder, Scottish Water has
continued to support regional and local resilience
partnerships as required.
The SFF continue to offer bespoke flood recovery
services to agencies and communities impacted by
flooding.
Angus Council will continue to review emergency
plans to ensure that they are relevant and fit for
purpose. They will also continue to provide
support to resilience partnerships.
Stirling Council will re-engage with a partnership
working model and embed communications links
between key group stakeholders and also to
expand group membership to other potential
partners (e.g., volunteer sector, TCV, etc)
Fife Council’s Flood Emergency Plan is due to be
updated in the 2023/34 financial year.
As a Category 2 Responder, Scottish Water will
continue to support regional and local resilience
partnerships as required. 
PLANNING
POLICIES
(80010001) 
G The Scottish Planning Policy (SPP) and
accompanying Planning Advice Notes set out
Scottish Ministers’ priorities for the operation of the
planning system and for the development and use
of land. In terms of flood risk management, the
SPP supports a catchment scale approach to
sustainable flood risk management and aims to
build the resilience of our cities and towns;
encourage sustainable land management in our
rural areas; and to address the long term
vulnerability of parts of our coasts and islands.
Under this approach, new development in areas
with medium to high likelihood of flooding should
generally be avoided. 
SEPA has a statutory role in relation to the
provision of flood risk advice to planning
authorities. This role is expressed in Section 72 of
the Flood Risk Management (Scotland) Act 2009.
SEPA also has a duty to co-operate with planning
authorities in the preparation of development plans.
Planning
authority
SEPA continues to exercise its planning functions with
a view to reducing overall flood risk. We effectively
contribute to the delivery of sustainable flood risk
management, and we support the delivery of FRM
Plans and Local FRM Plans. In line with the
management actions that accord with national planning
policies, we have and will continue to object to
development at medium to high risk of flooding when it
is contrary to the risk framework set out in Scottish
Planning Policy. We have and will continue to engage
from the start of the development plan process and
encourage planning authorities to undertake a Strategic
Flood Risk Assessment to inform their spatial strategy.
We remain committed to exercising our planning
functions with a view to reducing overall flood risk, and
when a new national planning policy context is finalised
later in 2022 via the National Planning Framework 4,
we will take the same approach. 
The current Perth & Kinross Local Development Plan
(LDP2) contains planning policy and development
For Perth & Kinross Council, key milestones in
the LDP3 review will be the policy and place
discussions which will take place during 2023/24,
culminating in the preparation of an Evidence
Report in 2024, whilst preparation of the
Proposed Plan is programmed for 2024/25. To
inform this process, the Council is undertaking a
Strategic Environmental Assessment (SEA) and
will prepare an Environmental Report to identify,
describe and evaluate the likely significant effects
on the environment. The SEA includes the
consideration of flood risk in site assessment and
policy work and will involve engagement with
SEPA and the Council’s flooding team.
Angus Council’s Flood Team will continue to
provide the current level of support to Planning
colleagues.
Stirling Council will continue to work closely with
both planning authorities in the development and
implementation of local development plans, to

Page 24

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|19
When consulted in relation to planning applications
for development or site allocations in development
plans, and where the planning authority considers
there may be a risk of flooding, SEPA will provide
advice. The advice provided by SEPA will be with
respect to the risk of flooding and on the basis of
the relevant information it holds which is suitable
for planning purposes. It will also be in line with the
principles and duties set out in the FRM Act.
Further information about how SEPA engage in the
planning system, including guidance on flood risk
and planning is available on SEPA website
http://www.sepa.org.uk/environment/land/planning/.
Current national planning policies, the Scottish
Planning Policy and accompanying Planning
Advice notes restrict development within the
floodplain and limit exposure of new receptors to
flood risk. Planning authorities are responsible for
implementing this policy guidance when preparing
Local Development Plans and when considering
individual planning applications. In addition to
national policies, local planning policies may place
further requirements within their area of operation
to restrict inappropriate development and prevent
unacceptable risk. Scottish Water is a statutory
consultee within the planning legislation. They
provide advice to planning authorities during the
preparation of Local Development Plans and are
required to comment on all outline or full planning
applications which are referred by a planning
authority.   
allocations which ensure that new development at
medium to high risk of flooding is avoided (unless flood
protection measures to the appropriate standard (1:200
years) already exist and are maintained, are under
construction, or are a planned measure in a current
flood risk management plan). SEPA and Perth &
Kinross Council’s flooding team input to the planning
application process as necessary to implement flood
risk policy and ensure there is an appropriate
assessment and mitigation of flood risk as detailed
development proposals come forward. The Council's
flooding team has reviewed approximately 1,300
planning applications since the start of the 2019/20
financial year as a consultee in the planning process.
The Council's flooding team has also provided
additional advice on flood risk management to the
Planning Authority outwith these formal consultations.
Perth & Kinross Council has started a review of LDP2
(which was adopted in November 2019) to produce
LDP3. The initial work on the LDP3 review has been
centred on data gathering and settlement audit work.
However, the work carried out since the adoption of
LDP2 has largely been focussed on preparing,
consulting on, revising and adopting the Flood Risk and
Flood Risk Assessment Supplementary Guidance,
which was adopted in March 2021, and responding to
Scottish Government consultations on the draft National
Planning Framework 4 (NPF4), and Local Development
Planning regulations. The main updates to the Flood
Risk and Flood Risk Assessment Supplementary
Guidance related to climate change; and the
requirements for sustainable urban drainage systems
(SuDS) and the ongoing maintenance responsibilities,
including information on potential maintenance
agreements with Scottish Water under Section 7 of the
Sewerage (Scotland) Act.
Angus Council’s Flood Team provide responses to all
Planning Applications where there is potential for flood
risk or surface water management systems to ensure
that Scottish Planning Policy and suitable design
criteria are met.
Within Stirling Council, flood risk information, including
the local flood risk management plan, feed into the local
development plan. Planning authorities are kept
informed of new developments internally through
flooding teams and through attendance of local
advisory group meetings.
Loch Lomond & Trossachs National Park have a
number of flooding policies in their local development
plan which are used by development management
during the assessment of planning applications.  Their
usage is being monitored as part of the monitoring of
incorporate the latest flood risk management
objectives into the process from the outset. Once
approved, any policies from the Fourth National
Planning Framework (NPF4) will be incorporated
also. The next planned publication date for LDP is
currently estimated to be mid-2025 at the earliest.

Page 25

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|20
the Local Development Plan.
Fife Council’s Planning Policy has been amended in the
Strategic Plan to ensure that flooding is considered at
the outset in line with current SPP. A Planning Policy is
in place to ensure a flood risk assessment, SuDs
details and any other relevant information is provided
with the submission of a Planning Application;
otherwise, the application is returned as incomplete.
Fife’s Flooding Team are providing direct input to the
creation of LDP2, focussing on the avoidance principle
first, before allocation of land is undertaken.

Page 26

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|21
3.2 Progress with Specific Actions to Manage Flood Risk Within PVAs 
This section sets out an assessment of the progress towards implementing actions that
are specific to each of the 17 PVAs shown in Table 3. Assessments of the progress of
actions within each PVA are presented. 
Table 3: Summary of Progress of Specific Actions to Manage Flood Risk Within
PVA’s During 2016-2022
PVA Location
Flood protection scheme/ works
Flood protection study
Maintain flood protection scheme*
Natural flood management study  
Natural flood management works
Strategic mapping and modelling
New
flood warning
Maintain flood warning*
Flood forecasting
Community flood action groups
Awareness raising
Self help
Property level protection scheme
Surface water plan/study
Maintenance
Site protection plans
Emergency plans/ response
Planning policies
08/01 Blair Atholl   N/A   G  N/A G G G G   G  G G
08/02 Kinloch Rannoch   N/A     N/A G  G G   G  G G
08/03 Aberfeldy & Pitlochry  G G   A G  G G G G G   G  G G
08/04 Alyth   N/A A  A G  N/A G  G G   G  G G
08/05 Kirriemuir & Forfar  G G   A G  N/A G  G G  G G  G G
08/06 Blairgowrie   N/A   G  G G  G G  A G  G G
08/07 Coupar Angus   N/A   G  N/A G  G G   G  G G
08/08
Luncarty, Stanley,
Bankfoot, Dunkeld &
Birnam 
A N/A   A G  G G  G G   G  G G
08/09 Tyndrum & Crianlarich   N/A   R  N/A G  G G   G  G G
08/10 Almondbank G  G   A G  G G  G G   G  G G
08/11 Scone R R N/A   G  N/A G  G G  R G  G G
08/12 Perth to Kinfauns
(north of A90) A  G   G  G G  G G  A G G  G G
08/13 Perth Centre  A G   A G  G G G G G  A G G  G G
08/14 Comrie A  G   A G  G G G G G   G  G G
08/15 Forteviot   N/A   A A  G G  G G   G  G G
08/16 Dunning   N/A   A G  G G  G G   G  G G
08/17 Bridge of Earn   G   A G  G G G G G   G  G G 
* Note: N/A is used where there is no formal Flood Protection Scheme or flood warning scheme
present. 
There are no specific actions identified for ‘property level protection scheme’ and ‘site
protection plans’ actions. Consideration of property level protection schemes will be
included in the ‘flood protection study’, ‘surface water plan/study’ and/or ‘emergency

Page 27

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3|22
plans/response’ actions. Site protection plans will be identified through these same ‘study’
actions and also ‘planning policies’ action.

Page 28

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/01 Blair Atholl|23
3.2.1 Blair Atholl PVA 08/01 
Local Plan District Local Authority Main Catchment
Tay Perth & Kinross Council River Garry (River Tay) 
Summary of Progress Within PVA 
There are fewer than 10 residential properties and non-residential properties at risk of flooding in the
Blair Atholl PVA. The Annual Average Damages are approximately £14,000. Further information can
be found in the Tay Local FRM Plan under PVA 08/01.
This PVA has been exposed to recent significant weather events including Storms Desmond and
Frank in December 2015 and January 2016, which resulted in flooding in the Tay and Garry
catchments. There have been no significant flooding events since. 
Key progress has been made through engagement with the community council which has
established a community resilience group, developed a resilience plan and installed a RiverTrack
Community Flood Alerting System. 
SEPA have also made progress on strategic mapping and modelling in order to improve the existing
flood maps for the area.
Whilst there is no specific action within this PVA for a flood protection study, the Blair Atholl Estate
commissioned a consultant to investigate the potential for any flood works to reduce risk to
properties on its land at Garryside, however no cost-effective options were identified.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Blair Atholl PVA 08/01 
PVA 
Flood
protection
scheme/works
Flood
protection
study 
Maintain flood
protection
scheme
Natural flood
management
study
Natural flood
management
works
Strategic
mapping and
modelling
New
flood
warning
Maintain flood
warning
Flood
forecasting
Community
flood action
groups
Awareness
raising
Self help
Property level
protection
scheme
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/01      G   G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Blair Atholl (PVA 08/01)
Action (ID)  Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping
and
Modelling
(80410016)
G
SEPA will seek to develop flood mapping in the
River Garry area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016-
2017
This action is complete.  Updated river flood hazard
mapping was published on the SEPA web site in
2020.
This action is complete.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being

Page 29

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/01 Blair Atholl |24
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding. 
considered alongside the technical,
resource and communication challenges
associated with providing surface water
flooding guidance.
Community
Flood Action
Groups
(80020012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Blair Atholl Community Council operates in this
area. The community council is currently in the
process of developing a community resilience
plan which includes plans to mitigate the impact
of flooding.
Community Ongoing Blair Atholl and Struan Community Resilience
Group is established in this area and their resilience
plan has been tested. This group forms part of the
A9 Resilience Plan.
The Scottish Flood Forum, with support from SSEN,
Perth & Kinross Council and SEPA, supported the
Community Resilience Group and Blair Atholl
Estates to install a RiverTrack Community Flood
Alerting System.
Perth & Kinross Council will continue to
coordinate with Blair Atholl and Struan
Community Council on a priority needs
basis where resources allow. 
The Scottish Flood Forum will carry out
further engagement as required. 
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
Authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Blair Atholl PVA. Perth &
Kinross Council held a de-briefing with the Blair
Atholl Community Resilience Group following the
flooding experienced in December 2015. The local
landowner (Blair Atholl Estate) has explored
potential ways of managing flood risk to their
properties. They undertook a high level flood
options study and were advised by Perth & Kinross
Council during this process.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the planned awareness raising
activities described in Table 2 of this report,
the responsible authorities will continue with
awareness raising activities when
developing any proposals for the remaining
actions set out in the Tay Local Flood Risk
Management Plan.
Self Help
(80410011) G
Refer to Description in Table 2. - Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007) 
G
Refer to Description in Table 2. Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans / 
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 30

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/01 Blair Atholl |25
Planning
Policies
(80010001)
G
Refer to Description in Table 2  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 31

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/02 Kinloch Rannoch|26
3.2.2 Kinloch Rannoch PVA 08/02 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Loch Rannoch (River Tay) 
Summary of Progress Within PVA 
There are approximately 30 residential properties and 20 non-residential properties at risk of
flooding in the Kinloch Rannoch PVA. The Annual Average Damages are approximately £94,000.
Further information can be found in the Tay Local FRM Plan under PVA 08/02.
There have been no significant weather events in this PVA since the publication of the Tay Local
FRM Plan. 
The Scottish Flood Forum has been involved in supporting the community to become more
resilient to the effects of flooding. The responsible authorities will continue with awareness raising
activities when developing any proposals for the remaining actions set out in the Tay Local FRM
Plan.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Kinloch Rannoch PVA 08/02
PVA 
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling
New
flood
warning
Maintain flood
warning
Flood
forecasting
Community
flood action
groups
Awareness
raising
Self help
Property level
protection
scheme
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/02         G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in the Kinloch Rannoch PVA
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities and
responders to reduce the impacts of flooding. SEPA
in partnership with the Met Office has developed a
public version of the daily Flood Guidance
Statement, the Scottish Flood Forecast, to provide
better and earlier information to the public. A beta
version of this product was launched in May 2022. 
Options for developing forecasts of surface water
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical,
resource and communication challenges
associated with providing surface water
flooding guidance.

Page 32

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/02 Kinloch Rannoch |27
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the Awareness Raising actions described
in Table 2 of this report, some additional progress
has been made in the Kinloch Rannoch PVA.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the planned awareness raising
activities described in Table 2 of this report,
the responsible authorities will continue with
awareness raising activities when
developing any proposals for the remaining
actions set out in the Tay Local Flood Risk
Management Plan.
Self Help
(80410011)
G
Refer to Description in Table 2. - Ongoing Further to the Self-Help actions described in Table 2
of this report, some additional progress has been
made in the Kinloch Rannoch PVA. The Scottish
Flood Forum’s (SFF) community engagement within
this PVA has included PLP exhibitions, selection,
surveys and providing appropriate and relevant
information to enable clients to make the right
decisions. The SFF has also provided ongoing
community PLP training, training for Flood Wardens
and resilience group promotion.  
Refer to planned actions described in Table
2 of this report.
Maintenance 
(80410007)
G
Refer to Description in Table 2. Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans /
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2. Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 33

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/03 Aberfeldy and Pitlochry|28
3.2.3 Aberfeldy and Pitlochry PVA 08/03 
Local Plan District Local Authority Main Catchment
Tay Perth & Kinross Council River Tay 
Summary of Progress Within PVA 
There are approximately 240 residential properties and 130 non-residential properties at
risk of flooding in the Aberfeldy and Pitlochry PVA. The Annual Average Damages are
approximately £1.2 million.  Further information can be found in the Tay Local FRM Plan
under PVA 08/03.
This PVA has been exposed to recent significant weather events including Storms
Desmond and Frank in Dec 2015 and Jan 2016, which resulted in flooding in the Tay and
Tummel catchments. Surface Water flooding was experienced at various locations in
Aberfeldy in January 2018, August 2019 and February 2020 (Storm Dennis).
Key progress has been made with the two identified Flood Protection Studies within this
PVA. The Pitlochry flood study was completed in October 2018. The Aberfeldy Flood
Study was completed in October 2019. The Aberfeldy Flood Study also informed a related
action - maintenance of the existing Weem Flood Protection Scheme (ID 80060017) - by
reviewing the condition and standard of flood protection offered by the scheme.
There have been no significant changes affecting progress, but it is worth noting that there
may be future catchment changes due to the A9 Dualling project.
SEPA have also made progress on strategic mapping and modelling to improve the
existing flood maps for the Pitlochry area. Scottish Water have completed sewer flooding
assessments in Pitlochry and Aberfeldy. 
(© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved.
Reproduced from Tay Flood Risk Management
Strategy, SEPA, December 2015). 
Selected Actions in the Aberfeldy and Pitlochry PVA 08/03
PVA
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/03  G G   A G  G G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in the Aberfeldy and Pitlochry PVA
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Study
(80040005)
G
A flood protection study has been recommended
for Pitlochry to assess whether flood storage,
sediment management, modification of
conveyance and installation/ modification of fluvial
control structures could reduce flood risk. The
study should also consider property relocation.
The study should build on the previous study
carried out by Perth & Kinross Council in 2007
and consider flooding from small watercourses as
Perth &
Kinross
Council
2016 –
2018
The Pitlochry flood study was completed in October
2018 and recommended a flood scheme involving
a collection of actions to reduce flood risk in the
area. The proposed scheme would protect a total
of 104 properties, providing a 1 in 200-year
standard of flood protection, including a further
allowance for future climate change. The study
findings were disseminated via local community
drop-in sessions held on 20 & 27 February 2019.
This action is complete. 
The delivery of the recommended flood
scheme is subject to prioritisation and
inclusion in the next Tay Local FRM Plan
and funding being made available. The
scheme may then proceed to outline design,
the statutory process required by the Flood
Act, detailed design, procurement and
construction.

Page 34

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/03 Aberfeldy and Pitlochry |29
well as the main river. The study should take a
catchment approach and consider the potential
benefits and dis-benefits and interaction between
actions upstream and downstream.
The Scottish Flood Forum supported the Council’s
consultation events for the flood study.
Flood
Protection
Study
(80050005)
G
A flood protection study has been recommended
for Aberfeldy to assess whether installation/
modification of fluvial control structures, direct
flood defences and sediment management could
reduce flood risk. The study should take a
catchment approach and consider the potential
benefits and dis-benefits and interaction between
actions upstream and downstream.
Perth &
Kinross
Council
2017 –
2019
The Aberfeldy flood study was completed in
October 2019 and recommended a flood scheme
involving new flood defences on the River Tay, the
Moness Burn and culvert improvements on the
Tomchulan Burn. The proposed scheme would
protect a total of 164 properties, providing a 1 in
200 year standard of flood protection. The study
findings were disseminated to the local community
via drop-in sessions on 20 and 25 June 2019.
This action is complete.
The delivery of the recommended flood
scheme is subject to prioritisation and
inclusion in the next Tay Local FRM Plan
and funding being made available.  The
scheme may then proceed to outline design,
the statutory process required by the Flood
Act, detailed design, procurement and
construction.
Maintain
Flood
Protection
Scheme
(80060017)
G
Continue to maintain the existing Weem Flood
Protection Scheme. The scheme was completed
in 2006 and includes a flood embankment and
pumping station. The scheme has a design
standard of protection of 1 in 100 years.
Perth &
Kinross
Council
Ongoing  Perth & Kinross Council's Roads Maintenance
Partnership carries out routine inspections of the
existing Weem Flood Protection Scheme.
Maintenance works are carried out as required. 
Recent works include maintenance and repairs to
the pumping station, clearance of the non-return
valve and vegetation management.  
The Weem Flood Protection Scheme was also re-
assessed as part of the Aberfeldy Flood Study
(Action ID 80050005). This included a condition
assessment and a review of the standard of
protection provided by the existing flood scheme.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be undertaken on an
annual basis and following flood events.
The maintenance works recommended by
the Aberfeldy flood study will be carried out,
subject to funding.
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
River Tummel and River Tay areas to improve
understanding of flood risk. The extent and timing
of improvements will depend on details scoping
and data availability. Where this work coincides
with local authority studies, SEPA will work
collaboratively to ensure consistent modelling
approaches are applied.  
SEPA 2016 –
2017 
Action partially complete. Updated river flood
hazard mapping for Pitlochry was published on the
SEPA web site in November 2020.       
SEPA began working on river mapping
updates in this area but upon review of the
available information it is not appropriate to
complete the update at this time. A review of
how modelling and mapping updates are
undertaken is being conducted to develop a
more effective method of regional and
national updates.    
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will undertake further investigation
and modelling in the Aberfeldy and Pitlochry
sewer catchments to improve knowledge and
understanding of flood risk in this area as required
under Section 16 of the Flood Risk Management
(Scotland) Act 2009.
Scottish
Water
Aberfeldy
2016 –
2017 
Pitlochry
2016 –
2019
The Scottish Water assessment of flood risk within
the Aberfeldy sewer catchment was delivered in
January 2020 
The Scottish Water assessment of flood risk within
the Pitlochry sewer catchment was delivered in
August 2018.
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Aberfeldy, Ballinluig to
Logierait, Logierait to Victoria Bridge, Pitlochry to
Ballinluig, River Tummel in Pitlochry and the
Upper Tay (from Taymouth Castle to Logierait)
flood warning areas which are part of the Tay river
flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood G Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood The Scottish Flood Forecast will be refined

Page 35

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/03 Aberfeldy and Pitlochry |30
Forecasting
(80410009)
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80040012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Pitlochry Resilience Group operates in this area.
The group is in the process of developing a
community resilience plan which includes
mitigating the impact of flooding.
Community Ongoing The Pitlochry and Moulin Community Resilience
Group is established in this area. This group forms
part of the A9 Resilience Plan. The Community
Council is in the process of developing a
community resilience plan which includes
mitigating the impact of flooding. 
The Scottish Flood Forum has supported the
establishment of the Pitlochry Flood Group. At
present the Group is currently inactive. 
Perth & Kinross Council will continue to
coordinate with Pitlochry and Moulin
Community Resilience Group on a priority
needs basis where resources allow. 
The Scottish Flood Forum will engage
further with the Pitlochry Flood Group to re-
start the Group and help develop a
community flood plan.
Community
Flood Action
Groups
(80050012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Aberfeldy Resilience Group operates in this area.
Membership of the group includes Perth &
Kinross Council, SEPA, Tayside Fire and Rescue
and the Scottish Flood Forum. The group aims to
help reduce flooding to businesses and
communities within the Aberfeldy area, improve
joint working before, during and after flooding and
increase community resilience. 
Community Ongoing The Aberfeldy Resilience Group is established in
this area.
The Tayside Waders Group also operate within the
Aberfeldy area, focussing on flood risk in the
Tayside Place/Crescent areas. They have set up a
store of flood resilience equipment (pumps,
sandbags, etc) with support from the Scottish Flood
Forum. Sandbags were donated to the group from
the local distillery.  
The Scottish Flood Forum continue to support the
Tayside Waders Flood Action Group who have a
local community flood plan and resources to
respond to flooding.
Perth & Kinross Council will continue to
coordinate with the Aberfeldy Resilience
Group and the Tayside Waders on a priority
needs basis where resources allow.  
The Scottish Flood Forum will follow up on
engagement with Hillcrest Housing
Association, Perth & Kinross Council and
Tayside Waders on property flood resilience.
The Forum will engage further with the
Tayside Waders to assess any further
support required.   
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities 
Ongoing Further to the awareness raising actions described in
Table 2 of this report, some additional progress has
been made in the Aberfeldy and Pitlochry PVA. 
Following flooding in December 2015/January
2016, Perth & Kinross Council held de-briefing
sessions with the Aberfeldy Resilience Group,
Tayside Waders and Pitlochry Resilience Group.
The findings from the Pitlochry flood study (Action
Further to the planned actions described in
Table 2 of this report, Perth & Kinross
Council will continue with awareness raising
activities when developing proposals for the
remaining actions in its local flood risk
management plans.

Page 36

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/03 Aberfeldy and Pitlochry |31
ID 80040005) were disseminated to the local
community in February 2019. The findings from the
Aberfeldy flood study (Action ID 80050005) were
disseminated to the community in June 2019.
Working alongside other responsible authorities,
SEPA carried out awareness raising activities in
this location at the community drop-in sessions for
the Pitlochry Flood Study in 2019. Some planned
activities were impacted by the Covid-19 pandemic.
Self Help
(80410011)
G
Refer to Description in Table 2.  N/A Ongoing Further to the self-help activities described in Table
2 of this report, some additional activity has been
carried out in this PVA.
The Council’s Housing Service has fitted flood
protection products to 28 Council properties within
Aberfeldy (no Council properties are affected by
flooding in Pitlochry).
The Scottish Flood Forum carried out 10 property
flood resilience assessments in Pitlochry; further
engagement is required to evaluate the action
taken.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007) 
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset/ land
managers
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional activity has
been carried out in this PVA. Maintenance work
has been carried out to the Weem Flood Protection
Scheme as described above (Action ID 80060017).
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 37

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/04 Alyth|32
3.2.4 Alyth PVA 08/04 
Local Plan District  Local authority  Main catchment 
Tay Perth & Kinross Council Alyth Burn (River Tay) 
Summary of Progress within PVA 
There are approximately 50 residential properties and 20 non-residential properties at risk of
flooding in the Alyth PVA. The Annual Average Damages are approximately £160,000. Further
information can be found in Tay Local FRM Plan under PVA 08/04. 
This PVA has been exposed to several recent significant weather events including including Storms
Desmond and Frank in December 2015 and January 2016 Although this did not result in any
significant flooding of properties, several roads and low-lying agricultural land were affected.
Although this did not result in any significant flooding of properties, several roads were affected in
the Alyth area. This followed on from an extreme flood event in July 2015 which affected
approximately 59 properties in Alyth.
Following the 2015 flood event, emergency works were carried out by Perth & Kinross Council to
remove debris from the burn and replace collapsed structures. Perth & Kinross Council, SEPA and
SNH produced a joint investigation report, which was disseminated to the public, as well as holding
various public events to improve awareness and promote resilience within the community.  The
Scottish Flood Forum also attended these events and has continued to support the community
through advice to the community council and residents.
In August 2020 a slow-moving storm impacted eastern Scotland, resulting in flooding from the Alyth
and Johnshill Burns. Approximately 18 properties were affected by flooding. The Council carried out
works on the Alyth Burn (to remove sediment and other debris deposited following the flood event)
and repaired two collapsed sections of culvert on the Johnshill Burn. The Doctors Burn also flooded
in August 2020 and twice in October 2020 as a result of high-water levels breaching a damaged
length of agricultural embankment; this was subsequently repaired by the landowner.  
There have been no significant changes within the catchment during the first LPD cycle, and a
natural flood management (NFM) study commenced in January 2022 and is on-going.
(© Crown copyright. SEPA licence
number 100016991 (2015). All rights
reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA, December
2015). 
Selected Actions in the Alyth PVA 08/04
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/04     A A G   G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Alyth (PVA 08/04)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Natural
Flood
Management
A
A natural flood management study has been
recommended for Alyth to assess whether
river/floodplain restoration and sediment
Perth &
Kinross
Council
2020-
2021
The Alyth natural flood management study
commenced in January 2022 and is on-going. The
contract was awarded to consulting engineers,
Once available, the draft study findings will
be disseminated via local community drop-in
sessions. The NFM study is programmed for

Page 38

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/04 Alyth |33
Study
(80070003)
management could help reduce flood risk. The
study should take a catchment approach and
consider the potential benefits and disbenefits
and interaction between actions upstream and
downstream
AECOM Ltd. completion in 2023.
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk. Approximately
900km² of improved surface water data is
currently available within this Local Plan District.
SEPA 2016-
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
across Scotland and represents a significant change
in rainfall amounts compared to FEH99 dataset, as
such it is no longer consider appropriate to deliver
this action as originally intended.  This action will not
be taken forwards as described. A major national
update of the surface water maps is underway which
will deliver updated surface water flooding maps for
Scotland representing the latest scientific
understanding.  
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next
flood risk management cycle. 
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will undertake further investigation
and modelling in the Alyth sewer catchment to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
2016-
2018
The Scottish Water assessment of flood risk within
the Alyth sewer catchment was completed in
January 2020.
This action is complete.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities and
responders to reduce the impacts of flooding. SEPA
in partnership with the Met Office has developed a
public version of the daily Flood Guidance
Statement, the Scottish Flood Forecast, to provide
better and earlier information to the public. A beta
version of this product was launched in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical,
resource and communication challenges
associated with providing surface water
flooding guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Alyth PVA.
Following a severe flooding event in Alyth in July
2015, Perth & Kinross Council, SEPA and SNH
produced a joint investigation report into the
mechanisms of the event. This was made publicly
available and disseminated to the local community.
Newsletters were also produced providing updates
to residents regarding emergency works being
carried out, as well as available support and advice
about improving resilience for future flooding events.
Following further flooding in August 2020, the
Council issued flood bulletins, responded to
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will undertake
further awareness raising in conjunction with
the Alyth Natural Flood Management Study
(Action ID 80070003) which is programmed
for completion in 2023.

Page 39

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/04 Alyth |34
correspondence and held an online community
meeting to raise awareness of flood risk. This
included liaison with the Community Council, the
Alyth Community Support Group and the Alyth
Development Trust. 
The Scottish Flood Forum also engaged with the
local community following the previous flood
incident. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal with
flooding.
The Alyth (Town Hall) Community Resilience Group
has developed a community emergency plan which
is generic in nature and available to support other
affected communities. 
Working alongside other responsible authorities,
SEPA carried out awareness raising activities in this
location, attending the post-flood online community
event in October 2020. Some planned activities
were impacted by the Covid-19 pandemic.
Self-Help
(80410011)
G
Refer to Description in Table 2. - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made in the Alyth PVA.
The Council’s Housing Service has fitted flood
protection products to 34 Council properties within
Alyth. 
The Scottish Flood Forum (SFF) are supporting the
development of Scotland’s first Retained Flood
Team in Alyth through training and learning
opportunities and implementing the community flood
plan.
The SFF held property flood resilience (PFR)
exhibitions and carried out 25 PFR assessments in
Alyth to support individual and community
responses to flooding.
The SFF delivered the Alyth Community Flood
Alerting System and are supporting its use with
Alyth Retained Flood Team. 
Alyth Development Trust secured National Lottery
funding to develop the Alyth Retained Flood Team.
Seven people recruited and SFF supporting the
development of a training and induction programme,
review of community flood plan and integrating
RiverTrack into response plans. A number of
properties have PFR and this needs to mapped
better and linked to better community resources.
Refer to planned actions described in Table
2 of this report.
The Council’s Housing Service are planning
to fit flood protection products to a further 10
Council properties within Alyth.
The Scottish Flood Forum are planning
training sessions on natural flood
management and an introduction to FRM in
late 2022.
Maintenance
(80410007)  G Refer to Description in Table 2. Perth &
Kinross
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
Refer to planned actions described in Table
2 of this report.

Page 40

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/04 Alyth |35
Council,
asset / land
managers
described in Table 2 of this report.
Following the August 2020 flooding, the Council
carried out emergency clearance works on the Alyth
Burn (to remove sediment and other debris
deposited following the flood event) and repaired
two collapsed sections of culvert on the Johnshill
Burn.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency plans/response actions
have been carried out in this PVA, beyond those
already described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2. Planning
authority
Ongoing No additional planning policies activities have been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 41

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/05 Kirriemuir and Forfar|36
3.2.5 Kirriemuir & Forfar PVA 08/05 
Local Plan District  Local authority  Main catchment 
Tay Angus Council River Tay 
Summary of Progress within PVA 
There are approximately 150 residential properties and 80 non-residential properties at risk of
flooding in the Kirriemuir and Forfar PVA. The Annual Average Damages are approximately
£950,000. Further information can be found in Tay Local FRM Plan under PVA 08/05. 
The PVA has been experienced significant weather events including Storms Desmond and Frank in
December 2015 and January 2016, which resulted in flooding in the upper Tay catchment.
Key progress has been made with the completion of a flood protection study for Kirriemuir and Forfar.  
SEPA have also made progress on strategic mapping and modelling undertaking a screening
exercise to characterise the catchments of the Dean Water and Gairie Burn. This will be completed
pending a review of how modelling and mapping updates are undertaken to develop a more effective
method of regional and national updates. 
© Crown copyright. SEPA licence
number 100016991 (2015). All rights
reserved. Reproduced from Tay Flood
Risk Management Strategy, SEPA
(December 2015). 
Selected Actions in Kirriemuir & Forfar PVA 08/05
PVA
Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/05  G G   A G   G  G G  G G  G G 
Summary of Progress of Actions to Manage Flood Risk in Kirriemuir and Forfar (PVA 08/05)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Study
(80110005)
G
Angus Council will undertake a flood protection
study for Forfar to be delivered by financial year
2019/20. This will assess whether flood storage,
modification of conveyance, direct flood defences,
sediment management and natural flood
management could reduce flood risk. The study
will also consider the viability of property level
protection and will include surface water
investigations in partnership with Scottish Water.
The study will take a catchment approach
considering the interactions between both
upstream and downstream.
Angus
Council
2016 -
2020
The fluvial/NFM studies for Forfar were
incorporated within the scope of Angus Council’s
Kirriemuir and Forfar Flood Protection Study. The
study is complete.
This action is complete.

Page 42

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/05 Kirriemuir and Forfar |37
Angus Council will coordinate the study with
Scottish Water, SEPA and Landowners, etc.
Flood
Protection
Study
(80100005)
G
A flood protection study has been recommended
for Kirriemuir to assess whether flood storage,
sediment management, modification of
conveyance, direct flood defences and natural
flood management could reduce flood risk.
Natural flood management options that should be
considered include floodplain restoration and
sediment management. The study should also
consider the viability of property level protection
and property relocation. The study will take a
catchment approach considering the interactions
between both upstream and downstream.
Angus Council will coordinate the study with
Scottish Water, SEPA and Landowners, etc.
Angus
Council
2016 -
2020
The fluvial/NFM studies for Kirriemuir were
incorporated within the scope of Angus Council’s
Kirriemuir and Forfar Flood Protection Study. The
study is complete.
This action is complete.
Maintain
Flood
Protection
Scheme
(80100017)
G
The existing Kirriemuir Flood Prevention Scheme
provides protection from the Gairie Burn. Angus
Council will maintain the existing Flood Protection
Scheme ensuring works are coordinated and
infrastructure is fully assessed. This will be done
by undertaking routine, reactive, programmed,
regulatory and emergency response inspections.
This work will be carried out by Angus Council
engineers on a priority needs basis as resource
allows. The general maintenance standard target
is to conduct watercourse inspections annually
and structural inspections biennially.
Angus
Council
2016 -
2022
The existing Kirriemuir - Gairie Burn flood
prevention scheme is inspected within Angus
Council's watercourse inspection programme. 
Remedial work is identified and programmed with
other identified priorities.
Recent improvements have included the repair and
reinstatement of a flood wall following inspection.
Angus Council will continue to inspect the
Kirriemuir - Gairie Burn Flood Protection
Scheme and prioritise its maintenance to
ensure the maximum possible level of
protection is maintained.
Angus Council will continue to engage with J
and D Wilkies on a regular basis as the main
receptor of flooding to seek their views on
the efficiency of the scheme. 
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
Dean Water and Gairie Burn areas to improve
understanding of flood risk. The extent and timing
of improvements will depend on detailed scoping
and data availability. Where this work coincides
with local authority studies, SEPA will work
collaboratively to ensure consistent modelling
approaches are applied.
SEPA 2017-
2018
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates. 
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. 
Scottish Water will undertake further investigation
and modelling within the Kirriemuir & Forfar sewer
catchments to improve knowledge and
understanding of surface water flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009. 
Scottish
Water
Forfar
2016-
2019 
Kirriemuir
2016-
2019
The Scottish Water assessment of flood risk within
the Forfar sewer catchment was completed in
January 2017. 
The Scottish Water assessment of flood risk within
the Kirriemuir sewer catchment was completed in
June 2019. 
This action is complete. 
Flood
Forecasting
(80410009) G
Refer to Description in Table 2.  SEPA 2016 -
2022
SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle.

Page 43

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/05 Kirriemuir and Forfar |38
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
2016 -
2022
Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Kirriemuir and Forfar PVA.
Angus Council held public consultations as part of
the Kirriemuir and Forfar flood study.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report. 
Self Help
(80410011) G
Refer to Description in Table 2.  - 2016 -
2022
No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80080018)
G
Angus Council will prepare Surface Water
Management Plans (SWMPs) to cover Forfar.
This will identify the most sustainable measures to
manage urban drainage and the risk of surface
water flooding, as well as sources of flooding such
as the sewer network, watercourses and sea. This
will establish a long-term action plan for each area
to manage surface water and influence future
capital investment, drainage maintenance, land-
use planning, emergency planning etc. Angus
Council will co-ordinate this work with Scottish
Water and SEPA through the Local Plan District
partnership with delivery of the SWMP by
2019/2020.
Angus
Council
Forfar
2016 -
2020 
Kirriemuir
2016 -
2020
The Kirriemuir and Forfar Flood Protection Study –
which incorporated this SWMP - is complete.
This action is complete.
Maintenance 
(80410007) G
Refer to Description in Table 2.  Angus
Council,
asset / land
managers
2016 -
2022
No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
responders
2016 -
2022
No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
authority
2016 -
2022
No additional planning policy activities have been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 44

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/06 Blairgowrie|39
3.2.6 Blairgowrie PVA 08/06 
Summary of Progress within PVA 
There are approximately 30 residential properties and 60 non-residential properties at risk of flooding
in the Blairgowrie PVA. The Annual Average Damages are approximately £120,000. Further
information can be found in Tay Local FRM Plan under PVA 08/06. 
This PVA has been exposed to significant weather events including Storms Desmond and Frank in
December 2015 and January 2016, although this did not result in any significant flooding of
properties. However, more recent flooding occurred in August 2020 and in October 2021, resulting in
flooding to a small number of properties.
Scottish Water have delivered an assessment of flood risk within the Blairgowrie sewer catchment.
SEPA has continued to operate a flood warning and flood forecasting service in this PVA.
Perth & Kinross Council has supported the Blairgowrie Community Resilience Group to develop its
community emergency plan. 
There have been no significant changes within the catchment during the first LPD cycle. A Surface
Water Management Plan (SWMP) commenced in October 2022 and is on-going. © Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Blairgowrie PVA 08/06
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/06      G  G G  G G  A G  G G 
Summary of Progress of Actions to Manage Flood Risk in Blairgowrie (PVA 08/06)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will undertake further investigation
and modelling in the Blairgowrie sewer catchment
to improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
2016-
2018
The Scottish Water assessment of flood risk within
the Blairgowrie sewer catchment was completed in
July 2018.
This action is complete.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Blairgowrie to the River
Isla flood warning area which is part of the Ericht
river flood warning scheme. 
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Ericht (River Tay)

Page 45

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/06 Blairgowrie |40
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made in the Blairgowrie PVA.
Blairgowrie Community Resilience Group has
developed a community emergency plan which is
generic in nature and is available to support other
affected communities.
Perth & Kinross Council issued community bulletins
and answers to frequently asked questions
following the flooding in August 2020 and October
2021 in order to provide advice and raise
awareness of flooding in the local community.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the awareness raising described
in Table 2 of this report, Perth & Kinross
Council will carry out awareness raising
activity as part of the Blairgowrie Surface
Water Management Plan (Action ID
80120018) which commenced in October
2022.
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those described in Table 2
of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80120018)
A
The area must be covered by a surface water
management plan or plans that set objectives for
the management of surface water flood risk and
identify the most sustainable actions to achieve
the objectives.
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process
Perth &
Kinross
Council
2020-
2022
The Blairgowrie surface water management plan
(SWMP) commenced in October 2022 and is on-
going. The contract was awarded to consulting
engineers, RSK Environmental Ltd.
Scottish Water have provided Section 16 outputs to
support the SWMP.  
Once available, the findings from the draft
surface water management plan will be
disseminated via local community drop-in
sessions. The surface water management
plan is programmed for completion in 2024.
Maintenance
(80410007)  G Refer to Description in Table 2.  Perth &
Kinross
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those described in
Refer to planned actions described in Table
2 of this report.

Page 46

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/06 Blairgowrie |41
Council,
asset / land
managers
Table 2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
authority
Ongoing No additional planning policies activities have been
carried out in this PVA, beyond those described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 47

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/07 Coupar Angus|42
3.2.7 Coupar Angus PVA 08/07 
Local Plan District Local Authority Main River Catchment
Tay Perth & Kinross Council Coupar Burn (River Tay) 
Summary of Progress within PVA 
There are approximately 10 residential properties and fewer than 10 non-residential
properties at risk of flooding in the Coupar Angus PVA. The Annual Average Damages
are approximately £26,000. Further information can be found in Tay Local FRM Plan
under PVA 08/07. 
The PVA was exposed to significant weather events including Storms Desmond and
Frank in Dec 2015 and Jan 2016 respectively, with several roads affected in the
Coupar Angus area. The ‘Beast from the East’ (March 2018) brought about significant
levels of snow fall across the PVA, although a gradual thaw limited any flooding issues
resulting from snowmelt.
Flood hazard mapping improvements have been made in this area by SEPA.
Scottish Water has delivered an assessment of flood risk within the Coupar Angus
sewer catchment.
SEPA, Perth & Kinross Council and the Scottish Flood Forum have engaged with the
community in this PVA. The Coupar Angus Community Resilience Group had
previously developed a community emergency plan, but the Group is currently
understood to be inactive.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Coupar Angus PVA 08/07
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/07      G   G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Coupar Angus (PVA 08/07)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016) G
SEPA will seek to develop flood mapping in the
Burrelton Burn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016 Following a screening exercise to characterise the
catchment, no changes to the existing flood
mapping were deemed necessary for the Burrelton
Burn. Within the wider PVA, improvements to the
river hazard mapping for the Coupar, Kettins and
Kinnochtry Burns were undertaken in 2015 with the
inclusion of a local authority study.
This action is complete.
Strategic
Mapping and
Modelling
G
Scottish Water will undertake further investigation
and modelling in the Coupar Angus sewer
catchments to improve knowledge and
Scottish
Water
2016 -
2022
The Scottish Water assessment of flood risk within
the Coupar Angus sewer catchment was completed
in July 2018.
This action is complete.

Page 48

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/07 Coupar Angus |43
(80410019) understanding of flood risk in this area as required
under Section 16 of the Flood Risk Management
(Scotland) Act 2009
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2. Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within the Coupar Angus PVA.
Community drop-in sessions were arranged in
Coupar Angus in September 2016 following the
completion of a flood scheme feasibility study. 
These events were attended by the Council, SEPA
and the Scottish Flood Forum. These sessions
highlighted to the community that a flood scheme
was not economically viable and how on-going
flood risk would be managed (via the other actions
identified in the Tay Local Flood Risk Management
Plan). This activity was coordinated with the
Coupar Angus Community Resilience Group.
The Scottish Flood Forum (SFF) also engaged with
the local community following previous flooding.
This included initial community engagement with
both the Community Council and the wider
community, exploring possible options regarding
future SEPA and Local Authority engagement. The
SFF provided a presentation and appropriate
advice to support the short-term strategic
development of the community to deal with
flooding.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid 19.
Refer to the planned actions described in
Table 2 of this report
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing Further to the emergency plans/response actions
described in Table 2 of this report, some additional
progress has been made within the Coupar Angus
Refer to planned actions described in Table
2 of this report.
The Scottish Flood Forum has identified

Page 49

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/07 Coupar Angus |44
PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has previously
included property level protection (PLP) exhibitions,
selection, surveys and the provision of appropriate
and relevant information to enable clients to make
the right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion. 
The Coupar Angus Community Resilience Group is
currently inactive. The Group had previously
developed a community emergency plan which was
generic in nature and was available to support
other affected communities.
Coupar Angus as a potential site for a
community flood alerting system. Further
engagement is required with the local
community as the Community Resilience
Group is currently inactive. 
Maintenance
(80410007)
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 50

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam|45
3.2.8 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam PVA 08/08 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Tay 
Summary of Progress within PVA 
There are approximately 360 residential properties and 130 non-residential properties at risk of
flooding in this PVA. The Annual Average Damages are approximately £740,000. Further
information can be found in Tay Local FRM Plan under PVA 08/08. 
This PVA has been exposed to significant weather events including Storms Desmond and Frank in
December 2015 and January 2016, which resulted in localised surface water flooding in Bankfoot.
Further flooding occurred in February 2018, August 2020 and February 2021 in Bankfoot and
Dunkeld. However, only a small number of properties were affected by these events.
Following previous investigations into a flood scheme in Bankfoot, community drop-in events were
held in 2016 to raise awareness of how flood risk would be managed in future within the PVA. The
events were attended by Perth & Kinross Council, SEPA, Scottish Water and Scottish Flood Forum.
Perth & Kinross Council carried out clearance and repair works in Bankfoot in 2017, to improve
channel conveyance and reduce surface water issues.
Scottish Water has delivered two assessments of flood risk within the Bankfoot and Dunkeld sewer
catchments.
A number of Community Resilience Groups within the PVA have developed emergency plans which
can be activated during significant flood events. This includes Auchtergaven Community Council and
Bankfoot Resilience Group, who communicate with the Council and receive updates regarding any
flood risk management activities in the area. 
There have been no significant changes affecting progress but it is worth noting that the A9 Dualling
project is still ongoing, which may result in some future catchment changes.
The Dunkeld flood study commenced in January 2020 and is on-going, with completion anticipated
by the end of 2022. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Luncarty, Stanley, Bankfoot, Dunkeld & Birnam PVA 08/08
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/08  A    A G  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Luncarty, Stanley, Bankfoot, Dunkeld & Birnam (PVA 08/08)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Study
(80170005)
A
A flood protection study has been recommended
for Dunkeld to assess whether modification of
conveyance, direct flood defences and sediment
management could reduce flood risk. The study
should build on previous studies and take a
Perth &
Kinross
Council
2019 -
2021
The Dunkeld Flood Protection Study commenced in
January 2020 and is nearing completion. The
contract was awarded to consulting engineers,
AECOM Ltd. 
Once available, the draft study findings will
be disseminated via local community drop-in
sessions. The study is programmed for
completion by the end of 2022.

Page 51

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam |46
staged approach to allow collaboration with SEPA
on strategic mapping and modelling for the Tay.
The study should take a catchment approach and
consider the potential benefits and disbenefits and
interaction between actions upstream and
downstream.
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
River Tay area to improve understanding of flood
risk. The extent and timing of improvements will
depend on detailed scoping and data availability.
Where this work coincides with local authority
studies, SEPA will work collaboratively to ensure
consistent modelling approaches are applied.
SEPA 2016
onwards
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Bankfoot
and Dunkeld sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Scottish
Water
Bankfoot
2016 -
2018 
Dunkeld
2016 -
2017
The Scottish Water assessment of flood risk within
the Bankfoot sewer catchment was completed in
May 2018. 
The Scottish Water assessment of flood risk within
the Dunkeld sewer catchment was completed in
February 2018. 
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Boat of Murthly, Caputh
to Kinclaven, Dalguise, Dunkeld and Burnmouth
Road, Logierait to Victoria Bridge and the Stanley
Mills flood warning areas which are part of the
Tay river flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013) G
Refer to Description in Table 2.  Responsible
Authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Community drop-in sessions were arranged in
Bankfoot in September 2016 following the
Further to the awareness raising described
in Table 2 of this report, Perth & Kinross
Council will continue with awareness raising
activities when developing proposals for the
remaining actions in the Tay Local Flood

Page 52

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam |47
completion of a flood scheme feasibility study.
These events were attended by the Council, SEPA,
Scottish Water and the Scottish Flood Forum.
These sessions highlighted to the community that a
flood scheme was not economically viable and how
on-going flood risk would be managed (via the
other actions identified in the Tay Local Flood Risk
Management Plan).
Perth & Kinross Council engaged in on-going
communications with Bankfoot Community Council
and the Bankfoot Community Resilience Group.
Updates on clearance and repair works carried out
in the Bankfoot area have been provided to both of
these groups.
The Scottish Flood Forum also engaged with the
local community in Bankfoot following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding.
Stanley, Bankfoot, Dunkeld & Birnam Community
Resilience Groups have developed community
emergency plans which are generic in nature and
are available to support other affected
communities.
Working alongside other responsible authorities,
SEPA carried out awareness raising activities in
this location. Some planned activities were
impacted by the Covid-19 pandemic.  
Risk Management Plan. This will be
extended to the other communities at risk of
flooding in this PVA in the Cycle 2 Tay Local
FRM Plan.
Self Help
(80410011)
G
Refer to Description in Table 2.  - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made within this PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
The Scottish Flood Forum supported the Bankfoot
Community Resilience Group but understand they
are currently inactive.
The SFF have provided property flood resilience
advice to a few residents in Bankfoot impacted by
flooding.
Refer to planned actions described in Table
2 of this report.
The Scottish Flood Forum has identified
Bankfoot as a potential site for a community
flood alert system. Further engagement is
required to assess feasibility.  
Maintenance
(80410007)  G Refer to Description in Table 2.  Perth &
Kinross
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
Refer to planned actions described in Table
2 of this report.

Page 53

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/08 Luncarty, Stanley, Bankfoot, Dunkeld & Birnam |48
Council,
asset / land
managers
been made within this PVA.
Significant clearance and repair works were carried
out in Bankfoot. In 2017, road drainage
improvements were made at Tulliebelton Road (to
reduce the risk of surface water flooding issues at
this location) and sediment management works
were carried out at two locations on the
Glenshauch Burn. Perth & Kinross Council carried
out further road drainage improvements at Dunkeld
Road, Bankfoot in 2019. 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 54

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/09 Tyndrum & Crianlarich|49
3.2.9 Tyndrum and Crianlarich PVA 08/09 
Local Plan District Local authority Main catchment
Tay Stirling Council River Tay 
Summary of Progress Within PVA 
There are approximately 20 residential properties and 10 non-residential properties at
risk of flooding in the Tyndrum and Crianlarich PVA. The Annual Average Damages
are approximately £160,000. Further information can be found in Tay Local FRM Plan
under PVA 08/09. 
This PVA has been exposed to recent significant weather events including Storms
Desmond and Frank in Dec 2015 and Jan 2016 respectively. More recently the ‘Beast
from the East’ (March 2018) brought about significant levels of snow fall across the
PVA, although a gradual thaw limited any flooding issues resulting from snowmelt.
Stirling Council is actively undertaking watercourse inspections to identify areas of
high risk of localised flooding. Where problems are identified and are within Council
land, remedial works are identified.  These works are prioritised annually on a
clearance and repair schedule based on the level of risk and on the annual
maintenance budget. Where problems are identified within private ownership the
Council will notify the owner of the remedial works required. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Tyndrum & Crianlarich PVA 08/09
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/09      R   G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Tyndrum & Crianlarich (PVA 08/09)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016)
R
SEPA will seek to develop flood mapping in the
River Fillin area to improve understanding of flood
risk. The extent and timing of improvements will
depend on detailed scoping and data availability.
SEPA 2018-
2019
A detailed screening exercise has been undertaken
to identify those outstanding modelling and
mapping actions with potential multi benefits for
Flooding, River Basin Management Planning 2027
priorities and development pressures. The outcome
of this review has indicated that this catchment is
not within a 2021 Objective Target Area and
doesn't provide any multiple benefits. A decision
has therefore been made not to progress this
action any further.      
This action will not progress any further.

Page 55

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/09 Tyndrum & Crianlarich |50
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011) G Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007) G
Refer to Description in Table 2.  Stirling
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 56

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/10 Almondbank|51
3.2.10 Almondbank PVA 08/10 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Almond (River Tay) 
Summary of Progress Within PVA 
There are approximately 50 residential properties and 110 non-residential properties at risk of
flooding in the Almondbank PVA. The Annual Average Damages are approximately £1.2 million. 
Further information can be found in Tay Local FRM Plan under PVA 08/10. 
There have been significant weather events in this PVA since the publication of the Tay Local FRM
Plan. Water levels on the River Almond were high during flood events on 12 August 2020, 31
October 2021 and 8 September 2022 but the flood defences protected properties. Some minor
flooding occurred in August 2020 at Lochty Industrial Estate.
Significant progress has been made in the PVA since the publication of the Tay Local FRM Plan. 
The Almondbank Flood Protection Scheme is substantially complete and operational. The scheme
has reduced flood risk to approximately 31 residential and 48 non-residential properties and has
delivered additional benefits to the community through improvements to leisure facilities and the
national cycle network. 
Awareness raising and community engagement were carried out in conjunction with the construction
of the flood scheme and to keep the community updated on progress. The Scottish Flood Forum
continues to support the community.
Following previous riverbank erosion, Perth & Kinross Council completed emergency erosion
protection works and repairs to a drainage outfall on the River Almond at Inveralmond, Perth in
2017. Scottish Water also completed repairs to an adjacent drainage outfall.
SEPA have commenced flood mapping improvements in this area.
Scottish Water has completed assessments of flood risk within the Almondbank sewer catchment
and the Perth City sewer catchment.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved.
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Almondbank PVA 08/10
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/10 G  G   A A G  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Almondbank (PVA 08/10)
Action
(Action ID)
Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80200006)
G
The Almondbank Flood Protection Scheme is
currently under construction and is scheduled to
be completed by summer 2017. The scheme will
reduce the risk of flooding to Almondbank from
the River Almond and East Pow Burn. The
scheme includes flood defences, flood storage,
Perth &
Kinross
Council
2016-
2017
The flood scheme was substantially complete in
September 2018. All works are complete with the
exception of an electrical connection and
commissioning of 5 pumping stations. 
The flood scheme is substantially complete.
The outstanding works to the pumping
stations are programmed to be completed by
early 2023.

Page 57

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/10 Almondbank |52
bridge raising and surface water actions. The
scheme will offer a 1 in 200 year standard of
protection. 
Maintain
Flood
Protection
Scheme
(80200017) G
Continue to maintain the existing flood protection
schemes that protect Almondbank and Perth
against flooding. The schemes include the Perth
Flood Protection Scheme that was completed
2002 and Almondbank Flood Protection Scheme
which is currently under construction and due to
be completed in 2016. 
Perth &
Kinross
Council
2016 -
2022
Perth & Kinross Council's Roads Maintenance
Partnership carries out routine inspections of the
existing Perth Flood Protection Scheme and the
Almondbank Flood Protection Scheme.
Maintenance works are carried out as required.
River bank erosion works and outfall repairs were
completed at Inveralmond in 2017. 
Routine inspections of the Perth Flood
Protection Scheme and the Almondbank
Flood Protection Scheme will continue to be
carried out as part of the Council's statutory
duties. Maintenance works will be carried out
as required. 
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
River Almond area (from Newton to the River Tay
confluence) to improve understanding of flood
risk. The extent and timing of improvements will
depend on detailed scoping and data availability.
SEPA 2017 SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time. 
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.  
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk. Approximately 900km²
of improved surface water data is currently
available within this Local Plan District.
SEPA 2016 -
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
across Scotland and represents a significant
change in rainfall amounts compared to FEH99
dataset, as such it is no longer consider
appropriate to deliver this action as originally
intended.  This action will not be taken forwards as
described. A major national update of the surface
water maps is underway which will deliver updated
surface water flooding maps for Scotland
representing the latest scientific understanding.  
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next
flood risk management cycle.
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the
Almondbank and Perth City sewer catchments to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
Almond-
bank
2016 -
2018 
Perth City
2016 -
2018
The Scottish Water assessment of flood risk within
the Almondbank sewer catchment was completed
in October 2017. 
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019.
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Almondbank and the
Inveralmond Industrial Estate flood warning areas
which are part of the Almond (Perth) river flood
warning scheme. When flood events occur in an
area with an existing flood warning service, SEPA
will seek to verify the flood forecasts and
warnings. SEPA will use feedback and post-event
data to ensure that our flood warning service is
timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009) G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the

Page 58

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/10 Almondbank |53
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
Authorities 
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Perth & Kinross Council carried out awareness
raising activity during the implementation of the
Almondbank Flood Protection Scheme. A project
specific website was set up and regular newsletters
issued to the community throughout the
construction phase of the flood scheme.
The Scottish Flood Forum (SFF) has also engaged
with the local community following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011)
G
Refer to Description in Table 2.  - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made within this PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007)  G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
been made within this PVA.
Following previous riverbank erosion, Perth &
Refer to planned actions described in Table
2 of this report.

Page 59

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/10 Almondbank |54
managers Kinross Council completed erosion protection
works and repairs to a drainage outfall on the River
Almond at Inveralmond, Perth in 2017.
Scottish Water also completed repairs to an
adjacent drainage outfall in 2017. 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 60

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/11 Scone|55
3.2.11 Scone PVA 08/11 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Annaty Burn (River Tay) 
Summary of Progress Within PVA 
There are approximately 40 residential properties and 50 non-residential properties at risk of flooding
in the Scone PVA. The Annual Average Damages are approximately £320,000. Further information
can be found in Tay Local FRM Plan under PVA 08/11.
This PVA has been exposed to recent significant weather events. In May 2017, heavy rainfall led to 
roads in the area being flooded. Heavy rain on 11 and 12 August 2020 led to surface water flood
water outside some properties to rise up to the level of airbricks. The most recent flood was recorded
February 2021 when multiple areas across Perth and Kinross were affected, including Scone.
The commencement of the Scone Flood Protection Scheme has been deferred due to a pause in the
capital grant funding. The commencement of the Scone Flood Study has been delayed but will
commence in the 2022/23 financial year.
The Council has continued to carry out a biennial CCTV survey of the barrel drain. The Council also
carried out sediment management and debris clearance works on the Annaty Burn (at the A94 Road
Bridge) in 2017, 2020 and 2021.
Scottish Water has delivered an assessment of flood risk within the Scone sewer catchment and
commenced a further assessment for the Perth City sewer catchment.
There have been no major changes to this catchment, although a housing development and road
infrastructure improvement project are to be implemented at the northern extents of Scone.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015) 
Selected Actions in the Scone PVA 08/11
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/11 R R    G   G  G G  R G  G G 
Summary of Progress of Actions to Manage Flood Risk in Scone (PVA 08/11)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80230006) R
A flood protection scheme has been proposed to
address the risk of river flooding to the
Goshenbank Park and Burnside area in Scone
from the Annaty Burn. The preferred option
consists of raising existing footbridges and
constructing riverside defences. The scheme
would provide a 1 in 200 year standard of
protection. Outline design development of the
scheme is expected to commence in the 2018/19
financial year.
Perth &
Kinross
Council
2018 -
2021
The commencement of the outline design of the
Scone (Annaty Burn) Flood Protection Scheme has
been deferred due to a pause in capital grant
funding. 
The flood protection scheme was
programmed for completion in 2024/25, but
that is now subject to capital grant funding. 
Flood R A flood protection study has been carried out by Perth & 2020 - The Scone Flood Protection Study is programmed The study is programmed for completion in

Page 61

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/11 Scone |56
Protection
Study
(80230005)
Perth & Kinross Council for the Annaty Burn,
Scone in 2007. The study identified a viable flood
protection scheme that is currently being
progressed as a priority in the first flood risk
management cycle. Further study has been
recommended to supplement the previous
investigations, looking at natural flood
management and surface water flooding (see also
Action ID 80210018). Natural flood management
options that should be considered include river/
floodplain restoration and sediment management.
The study should also investigate the viability of
property level protection. The study should take a
catchment approach and consider the potential
benefits and disbenefits and interaction between
actions upstream and downstream.
Perth & Kinross Council has also carried out a
flood protection study for the barrel drain in Scone
in 2007 which did not identify a viable flood
protection scheme. However, the Perth & Kinross
Council intends to re-examine this previous study
following recent drain failures and this will be
carried out in conjunction with the studies
identified above.
Kinross
Council
2022 to commence in the 2022/23 financial year.  the 2024/25 financial year. 
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Perth
City and Scone sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Scottish
Water
Perth City
2016-
2019 
Scone
2016 -
2019
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019. 
The Scottish Water assessment of flood risk within
the Scone sewer catchment was completed in
September 2017.  
This action is complete.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013) G
Refer to Description in Table 2.  Responsible
Authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Perth & Kinross Council has engaged with Scone
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will carry out
awareness raising activities in conjunction

Page 62

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/11 Scone |57
community council. The Council carries out a bi-
annual CCTV survey of the barrel drain in Scone
and the results of this survey are shared with the
Community Council. This helps to raise awareness
of the responsibilities of landowners regarding the
drain. Discussions were also held around the
flooding and drainage proposals for the housing
development in Scone (north). 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
with the Scone (Annaty Burn) Flood
Protection Scheme, the Scone Flood
Protection Study and Surface Water
Management Plan (Action IDs 80230005,
80230006 & 80210018) which are
programmed to commence in 2022/23. The
Council will continue to engage with the
Community Council and local landowners
regarding the results of future CCTV surveys
of the barrel drain.
Self Help
(80410011) G
Refer to Description in Table 2.  - Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80210018)
R
The area must be covered by a surface water
management plan or plans that set objectives for
the management of surface water flood risk and
identify the most sustainable actions to achieve
the objectives.
This surface water management plan will be
delivered by Perth & Kinross Council as part of
the flood protection study (Action ID 80230005).
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process.
Perth &
Kinross
Council
2020 -
2022
The Scone surface water management plan is
programmed to commence in the 2022/23 financial
year. 
The surface water management plan is
programmed for completion in the 2024/25
financial year. 
Maintenance
(80410007) 
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
been made within this PVA.
Recent maintenance carried out by Perth and
Kinross Council included sediment management
and debris clearance works on the Annaty Burn (at
the A94 Road Bridge) in 2017, 2020 and 2021.
Perth & Kinross Council is also committed to
carrying out a bi-annual CCTV inspection of the
barrel drain, with any identified defects being
referred to the relevant landowners for action.
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 63

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/12 Perth to Kinfauns (north of A90) |58
3.2.12 Perth to Kinfauns (north of A90) PVA 08/12 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Tay 
Summary of Progress Within PVA 
There are approximately 80 residential properties and 20 non-residential properties at
risk of flooding in this PVA. The Annual Average Damages are approximately
£180,000.  Further information can be found in Tay Local FRM Plan under PVA 08/12. 
This PVA has been exposed to significant weather events including Storms Desmond
and Frank in Dec 2015 and Jan 2016 respectively, with several properties and roads
affected. The ‘Beast from the East’ (March 2018) brought about significant levels of
snow fall across the PVA, although a gradual thaw limited any flooding issues
resulting from snowmelt. More recently Perth was affected by surface water flooding in
August 2020, September 2022 and November 2022 although relatively few properties
were affected in this PVA.
Scottish Water and Perth & Kinross Council worked in partnership on the Perth
Integrated Catchment Study (ICS), which was completed in 2019. The optioneering
phase (to consider potential solutions to the identified flooding issues in five high
priority areas) is nearing completion.
Scottish Water has completed assessments of flood risk within the Perth City and
Scone sewer catchments.
SEPA have continued to provide a flood forecasting service and operate their existing
flood warning system in this PVA.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Perth to Kinfauns (north of A90) PVA 08/12
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/12 A  G   G  G G  G G  A G G  G G 
Summary of Progress of Actions to Manage Flood Risk in Perth to Kinfauns (north of A90) (PVA 08/12)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80240006)
A
Flood protection works have been proposed at
Bridgend in Perth to reduce the risk of surface
water flooding. The proposed works include a
high capacity drainage channel and outfall to the
River Tay. Outline design of the works will
commence in 2019/20.
Perth &
Kinross
Council
2019 -
2021
Work to produce an economic appraisal, update
the outline design and produce a detailed design
for the Bridgend flood protection works 
commenced in March 2021. The contract was
awarded to consulting engineers, RPS Consulting
Ltd and the detailed design is anticipated to be
completed in the 2022/23 financial year.
The flood protection works are programmed
for completion in the 2023/24 financial year,
subject to completion of detailed design and
funding. 
Maintain
Flood G Continue to maintain the existing Perth Flood
Protection Scheme along the east bank of the
Perth &
Kinross
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
Routine inspections will continue to be
carried out as part of the Council's statutory

Page 64

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/12 Perth to Kinfauns (north of A90) |59
Protection
Scheme
(80260017)
River Tay. The scheme was completed in 2002
and includes major flood defence works such as
embankments, walls, sluice gates, ponds and
pumping stations.
Council existing flood defences in Perth. Maintenance
works are carried out as required. 
Recent works have included repairs to flood gates,
access improvements and trash screen
maintenance.
A full pseudo-closure of the flood gates on the
Perth Flood Protection Scheme is carried out
annually to test the operation of the scheme and
ensure operatives are fully trained in the event of a
flood. This also serves to highlight any
maintenance issues that may require to be
addressed.
duties.  Inspections will be carried out on an
annual basis and following flood events.
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Perth
City and Scone sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Risk Management (Scotland) Act 2009.
Scottish
Water
Perth City
2016 -
2018 
Scone
2016 -
2019
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019. 
The Scottish Water assessment of flood risk within
the Scone sewer catchment was completed in
September 2017.
This action is complete.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Basement Properties
from North Inch to Friarton Bridge flood warning
area which is part of the Tay river flood warning
scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013) G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Following widespread surface water flooding in
Perth in August 2020, the Council issued flood
bulletins, responded to correspondence and held a
series of online community meetings to raise
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will carry out further
awareness raising activity in conjunction with
the Perth Surface Water Management Plan
and flood protection works at Bridgend
(Action IDs 80240018 & 80240006).

Page 65

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/12 Perth to Kinfauns (north of A90) |60
awareness of flood risk. 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school/education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Self Help
(80410011) G Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Surface
Water
Plan/Study
(80240018)
A
The area must be covered by a surface water
management plan (SWMP) or plans that set
objectives for the management of surface water
flood risk and identify the most sustainable
actions to achieve the objectives.
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process.
Perth &
Kinross
Council
2018 -
2020
Work on the Perth Surface Water Management
Plan commenced in December 2021. The contract
was awarded to consulting engineers, Amey
Consulting Ltd. 
The development of the Perth Surface Water
Management Plan is on-going and is
programmed for completion in 2023.
Surface
Water
Plan/Study
(80240019)
G
An integrated catchment study covering the Perth
City catchment will be carried out to support the
surface water management planning process in
the Perth surface water management priority
area. The study will improve knowledge and
understanding of the interactions between the
above ground and below ground drainage
network e.g., with the sewer network,
watercourses and (where applicable) the sea.
This will improve the understanding of local
surface water flood risk. The stated timescales
and funding arrangements between Scottish
Water and Perth & Kinross Council will take the
studies though the Scoping and Modelling phases
to define the significant flooding issues in the
catchment. After this has been completed, it is
expected that the integrated catchment study
partnerships will remain in place and will progress
with the Optioneering phase to establish the
preferred solution(s) to the significant flooding
issues.
Scottish
Water in
partnership
with Perth &
Kinross
Council
Perth City
2016 -
2019
The Perth Integrated Catchment Study commenced
in November 2016. The contract was awarded to
consulting engineers, ARC. A catchment flood
assessment identified 32 flooding ‘hotspots’ (areas
of higher flood risk) across the Perth sewer
catchment area. The study was completed in
December 2019.  
No options appraisal was carried out as part of the
study, however further investigations at 5 of the
hotspots in PVA 08/13 were taken forward through
an IFOS (Internal Flooding due to Overloaded
Sewers)(refer to Action ID 80240019 in PVA
08/13). 
The Perth Integrated Catchment Study was
completed in December 2019. This study
provided an improved understanding of the
flooding mechanisms in Perth. 
A further study to consider the other
identified flooding hotspots in Perth has
been included in the Cycle 2 Tay Local
Flood Risk Management Plan. 
Maintenance
(80410007) G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report. 
Refer to planned actions described in Table
2 of this report.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 66

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/12 Perth to Kinfauns (north of A90) |61
Planning
Policy
(80010001)
G Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 67

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/13 Perth Centre|62
3.2.13 Perth Centre PVA 08/13 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Perth coastal 
Summary of Progress Within PVA 
There are approximately 320 residential properties and 260 non-residential properties at risk of
flooding. The Annual Average Damages are approximately £1.8 million. Further information can be
found in Tay Local FRM Plan under PVA 08/13. 
This PVA has been exposed to significant weather events including Storms Desmond and Frank in
Dec 2015 and Jan 2016 respectively, with several properties and roads affected. The ‘Beast from
the East’ (March 2018) brought about significant levels of snow fall across the PVA, although a
gradual thaw limited any flooding issues resulting from snowmelt. More recently, Perth was affected
by surface water flooding in August 2020, when approximately 165 properties were affected, and
again in September 2022, when approximately 30 properties were affected.  
Scottish Water and Perth & Kinross Council worked in partnership on the Perth Integrated
Catchment Study (ICS), which was completed in 2019. The optioneering phase (to consider potential
solutions to the identified flooding issues in five high priority areas) is nearing completion.
Perth & Kinross Council have engaged consulting engineers to complete the Craigie Burn flood
study and to develop the Perth Surface Water Management Plan and this work is on-going.  
Perth & Kinross Council has carried out significant maintenance, clearance and repair works on the
Perth Flood Protection Scheme, including works on the North Muirton Flood Embankment in 2019
and 2020. Substantial clearance and repair works were carried out along the Scouring and Craigie
Burns following flooding in August 2020.
Scottish Water has completed assessments of flood risk within the Almondbank and Perth City
sewer catchments.
SEPA have continued to provide a flood forecasting service and operate their existing flood warning
system in this PVA.
The Council coordinates the Perth & Kinross Local Resilience Partnership’s Community and
Business Resilience Group in this PVA. Awareness raising activity has been carried out by the
Council and the Scottish Flood Forum and will continue to be delivered through the projects noted
above. 
No significant changes have taken place within the PVA over the first FRM cycle so far, however
there are a number of developments proposed or taking place around the Perth boundary.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Perth Centre PVA 08/13
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/13  A G   A G  G G G G G  A G G  G G 
Summary of Progress of Actions to Manage Flood Risk in Perth Centre (PVA 08/13)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection A A flood protection study has been recommended
for Perth and will consider flood risk from the
Perth &
Kinross
2016 -
2018
The Craigie Burn flood study commenced on
programme in November 2016 as part of the Perth
Once available, the draft study findings will
be disseminated via local community drop-in

Page 68

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|63
Study
(80290005)
Craigie Burn. The study will assess direct flood
defences and sediment management. The study
should take a catchment approach and consider
the potential benefits and disbenefits and
interaction between actions upstream and
downstream. The study area (primarily Queens
Avenue, Queen Street and Windsor Terrace) falls
within the area of the Perth City integrated
catchment study and surface water management
plan (Action ID’s 80240018 and 80240019). The
study will therefore be integrated with the Perth
integrated catchment study.
Council integrated catchment study (ICS) (Action ID’s
80240018 and 80240019). A hydraulic model of the
Craigie Burn was produced as part of the wider ICS
project.
The remainder of the Craigie Burn Flood Study re-
commenced in November 2021 and is on-going.
The contract was awarded to consulting engineers,
Amey Consulting Ltd.
sessions. The Craigie Burn Flood Study is
programmed for completion in 2023.
Maintain
Flood
Protection
Scheme
(80290017)
G
Continue to maintain the flood protection schemes
that protect Perth against flooding. The schemes
include the Perth Flood Protection Scheme that
was completed 2002, including flood defences on
the Perth Town Lade and Craigie Burn, and the
Almondbank Flood Protection Scheme which is
currently under construction and due to be
completed in 2016.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Perth. Maintenance
works are carried out as required. 
Works have included sediment management works
on the Craigie Burn and clearance works on the
flood storage pond at Broxden in 2017.
A full pseudo-closure of the flood gates on the
Perth Flood Protection Scheme is carried out
annually to test the operation of the scheme and
ensure operatives are fully trained in the event of a
flood. This also serves to highlight any
maintenance issues that may require to be
addressed.
The programme of routine inspections will be
extended to the Almondbank Flood Protection
Scheme in 2019.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be carried out on an
annual basis and following flood events.
Maintain
Flood
Protection
Scheme
(80300017)
G
Continue to maintain the Perth Flood Protection
Scheme. The scheme was completed in 2002 and
includes major flood defence works such as
embankments, walls, sluice gates, ponds and
pumping stations.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Perth. Maintenance
works are carried out as required. Works have
included sediment management works on the
Craigie Burn, works to address surface water
flooding at Perth Harbour, repairs to the South Inch
and Inveralmond pumping stations, repairs to flood
gates, access improvements, trash screen
maintenance and flood storage reservoir
inspections.
A full preudo-closure of the Perth Flood Protection
Scheme is carried out annually to test the operation
of the scheme and ensure operatives are fully
trained in the event of a flood. This also serves to
highlight any maintenance that may be required.
The Council installed a sheet piled cut off wall at
the North Muirton Flood Embankment in 2019 and
2020 to reduce the risk of ground water seepage
during future flood events.
The Council arranged to replace the pumps in the
South Inch pumping station in 2019, and the
remaining pumps on the scheme were replaced
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be carried out on an
anuual basis and following flood events.

Page 69

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|64
over the last year.
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
River Almond area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability. Where this work coincides with local
authority studies, SEPA will work collaboratively
to ensure consistent modelling approaches are
applied.
SEPA 2017 SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.       
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the
Almondbank and Perth City sewer catchments to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
Perth City
2016 -
2018 
Almond -
bank
2016 -
2018
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019. 
The Scottish Water assessment of flood risk within
the Almondbank sewer catchment was completed
in October 2017. 
This action is complete.
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Almondbank and the
Inveralmond Industrial Estate flood warning areas
which are part of the Almond (Perth) river flood
warning scheme. 
Continue to maintain the North Muirton Industrial
Estate and the Basement Properties from North
Inch to Friarton Bridge flood warning areas which
are part of the Tay river flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2. SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80290012) G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
Community Ongoing The Perth & Kinross Local Resilience Partnership’s
Community and Business Resilience Group
operates in this area. 
Resources have also been offered by various other
local groups.
The Scottish Flood Forum supported, and
Perth & Kinross Council will continue to
coordinate with the Local Resilience
Partnership’s Community and Business
Resilience Group on a priority needs basis
where resources allow.
The Scottish Flood Forum will engage

Page 70

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|65
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Perth Business Community Resilience Group
operates in this area. Membership of the group
includes Perth & Kinross Council, SEPA, Tayside
Fire and Rescue and the Scottish Flood Forum.
The group aims to reduce flooding to businesses
and communities within Perth city centre, improve
joint working before, during and after flooding and
develop ways of increasing community resilience
against flooding.
continues to engage with, the South Inch Flood
Group after the flooding of August 2020. The
Forum also provided flood recovery services to
people impacted by flooding at this time. This
included several online events organised by Perth
& Kinross Council to support communities.
further with the South Inch Flood Group to
build links, consider a community flood plan
and assess the Forum’s property flood
resilience advice.  
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Awareness raising activity was carried out as part
of the Perth Integrated Catchment Study (Action ID
80240019). Perth & Kinross Council and Scottish
Water have issued a newsletter to residents on
Feus Road, Perth every three months to keep them
informed. Following widespread surface water
flooding in Perth in August 2020, the Council
issued flood bulletins, responded to
correspondence and held a series of online
community meetings to raise awareness of flood
risk. Similar activity was undertaken following the
flooding of September 2022. The Perth IFOS
(Internal Flooding due to Overloaded Sewers)
study findings for the Feus Road area were
disseminated via a local community drop-in session
on 1 November 2022.
The Scottish Flood Forum (SFF) has also engaged
with the local community following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding. The SFF provided flood recovery
services to people impacted by flooding in August
2020. This included several online events
organised by PKC to support communities. 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Further to the planned awareness raising
activities described in Table 2 of this report,
Perth & Kinross Council will carry out further
awareness raising activity in conjunction the
Craigie Burn Flood Protection Study and the
Perth Surface Water Management Plan
(Action ID's 80290005 & 80240018).
The Perth IFOS study is on-going and is
programmed for completion in 2023 (Action
ID 80240019). The study findings for the
Cavendish Avenue area will be disseminated
via local community drop-in sessions in early
2023.
Self Help G Refer to Description in Table 2. N/A Ongoing Further to the self-help actions described in Table 2 Refer to planned actions described in Table

Page 71

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|66
(80410011) of this report, some additional progress has been
made within the Perth Centre PVA.
Following flooding in August 2020, Perth & Kinross
Council’s Housing Service fitted PLP products to
some Council housing in the vicinity of Wallace
Crescent, Perth.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion. More recently, the SFF
has provided independent property flood resilience
advice and carried out 15 PFR assessments to
homes impacted by flooding.
2 of this report.
Surface
Water
Plan/Study
(80240018)
A
The area must be covered by a surface water
management plan (SWMP) or plans that set
objectives for the management of surface water
flood risk and identify the most sustainable
actions to achieve the objectives.
Scottish Water will provide local knowledge and
understanding of the sewer network. This includes
Scottish Water corporate data (as applicable) and,
where available, outputs of Section 16 or
integrated catchment studies, to assist with the
surface water management planning process.
Perth &
Kinross
Council
2018 -
2020
Work on the Perth Surface Water Management
Plan commenced in December 2021. The contract
was awarded to Amey Consulting Ltd.
The development of the Perth Surface Water
Management Plan is on-going and is
programmed for completion in 2023.
Surface
Water
Plan/Study
(80240019)
G
An integrated catchment study covering the Perth
City catchment will be carried out to support the
surface water management planning process in
the Perth surface water management priority
area. The study will improve knowledge and
understanding of the interactions between the
above ground and below ground drainage
network e.g., with the sewer network,
watercourses and (where applicable) the sea.
This will improve the understanding of local
surface water flood risk.
The stated timescales and funding arrangements
between Scottish Water and Perth & Kinross
Council will take the studies though the Scoping
and Modelling phases to define the significant
flooding issues in the catchment. After this has
been completed, it is expected that the integrated
catchment study partnerships will remain in place
and will progress with the Optioneering phase to
establish the preferred solution(s) to the
significant flooding issues.
Scottish
Water in
partnership
with Perth &
Kinross
Council
Perth City
2016 -
2019
The Perth Integrated Catchment Study commenced
in November 2016. The contract was awarded to
consulting engineers, ARC. A catchment flood
assessment identified 32 flooding ‘hotspots’ (areas
of higher flood risk) across the Perth sewer
catchment area. The study was completed in
December 2019.  
No options appraisal was carried out as part of the
study, however further investigations at 5 of the
hotspots were taken forward through an IFOS
(Internal Flooding due to Overloaded Sewers)
study. The hotspots were located at Feus Road,
Cavendish Avenue, Marshall Place, Bells Sports
Centre and South Street. The Feus Road and
Cavendish Avenue hotspots were investigated
jointly by Scottish Water and Perth & Kinross
Council. The study findings for the Feus Road area
were disseminated via a local community drop-in
session on 1 November 2022.
The IFOS study is currently on-going and is
programmed for completion in 2023. 
The Perth Integrated Catchment Study was
completed in December 2019. This study
provided an improved understanding of the
flooding mechanisms in Perth. 
The IFOS study (and options appraisal) is
on-going and is programmed for completion
in 2023. The study findings for the
Cavendish Avenue area will be disseminated
via local community drop-in sessions in early
2023. Scottish Water will continue with study
work on potential sewer improvements until
summer 2023.
A further study to consider the other
identified flooding hotspots in Perth has
been included in the Cycle 2 Local Flood
Risk Management Plan.
Maintenance
(80410007) G Refer to Description in Table 2. Perth &
Kinross
Ongoing Following extreme flooding in August 2020, Perth &
Kinross Council undertook emergency works within
Refer to planned actions described in Table
2 of this report.

Page 72

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/13 Perth Centre|67
Council,
asset / land
managers
the Craigie Burn catchment. This included
removing debris/blockages, sediment and
vegetation management along the Scouring,
Buckie and Craigie Burns. Further vegetation and
sediment management works were carried out at
Queens Avenue in March 2022. Further clearance
works were undertaken following the flooding in
September 2022.
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2. Category 1
and 2
Responders
Ongoing No additional emergency plans/ response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2. Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 73

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/14 Comrie|68
3.2.14 Comrie PVA 08/14 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council, Stirling Council River Earn 
Summary of Progress Within PVA 
There are approximately 510 residential properties and 100 non-residential properties at risk of
flooding. The Annual Average Damages are approximately £2.0 million. Further information can be
found in Tay Local FRM Plan under PVA 08/14. 
The PVA has also been exposed to significant weather events including Storms Desmond and Frank
in Dec 2015 and Jan 2016 respectively, and more recently the ‘Beast from the East’ (March 2018)
which brought about significant levels of snow fall across the PVA, although a gradual thaw limited
any flooding issues resulting from snowmelt.
Following on from the feasibility work and public consultation events in late 2016, the Comrie Flood
Protection Scheme was published on 28 February 2020. Following a local hearing, the Scheme was
confirmed on 18 August 2021 and the detailed design is nearing completion. In the meantime,
advance works for the Scheme commenced in late August 2022. 
SEPA have commenced flood mapping improvements in the Upper Earn area. SEPA have also
continued to provide a flood forecasting service and operate their existing flood warning system in
this PVA.
Scottish Water has completed assessments of flood risk within the Comrie and Crieff sewer
catchments.
Awareness raising activity has been carried out by the Council and the Scottish Flood Forum and
has been coordinated with the Comrie Community Resilience Group. This activity will continue to be
delivered through the projects noted above.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Comrie PVA 08/14
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/14 A  G   A G  G G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Comrie (PVA 08/14)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Flood
Protection
Scheme/
Works
(80330006) A
A flood protection scheme is underway for Comrie
to reduce the combined flood risk from the Water
of Ruchill, River Earn and River Lednock. The
proposed scheme consists of flood walls and
embankments. The scheme will provide a 1 in 200
standard of protection plus freeboard.
Perth &
Kinross
Council
2016 -
2020
The Comrie Flood Protection Scheme was
published on 28 February 2020 and, following a
local hearing, was subsequently confirmed without
modification by the Council’s Environment &
Infrastructure Committee on 18 August 2021.
Planning permission was granted on 16 December
2021. The detailed design for the main works is
nearing completion. The advance works for the
Once the detailed design for the Comrie
Flood Protection Scheme is complete, the
main works contract will be tendered and
awarded. The main works are currently
programmed to commence on site in 2023.
Substantial completion of the Scheme is
currently programmed for late 2024.

Page 74

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|69
scheme were awarded to contractors, Balfour
Beatty, and commenced in late August 2022 and
are on-going. 
The Scottish Flood Forum supported the flood
protection scheme consultation events with the
Council and key agencies.
Flood
Protection
Scheme/
Works
(8303021) 
A
Transport Scotland will carry out civil engineering
work which will reduce the risk of flooding on
identified sections of the trunk road. Transport
Scotland will manage the reduction through the
operation of the trunk road via the routine and
cyclic maintenance programme. Transport
Scotland maintains an on-going review of areas of
known historic flood locations and should areas
such as Comrie be identified as such an area,
Transport Scotland will seek funding in due
course based on a prioritised criteria to support
the routine and cyclic maintenance programme at
these locations.
Transport
Scotland
Ongoing Opportunities to alleviate flooding have been
considered as part of on-going routine and cyclic
maintenance. This included the recent essential
carriageway resurfacing on two sections of the A85
Trunk Road East of Comrie and East of Dunira
Estate (October 2016).
December 2022 - no further update provided by
Transport Scotland.
Transport Scotland flooding workshop
planned for April 2019.
Improvement opportunities will continue to
be sought and included in forthcoming
routine and cyclic maintenance schemes
and programmes.
Research project underway to determine
how the CREW surface water flood
forecasting system could be applied to linear
transport corridors such as the trunk road
network of Scotland.
The flooding database will be reviewed to
assess key locations for improvements.
Detailed schemes will be developed as
required.
December 2022 - no further update provided
by Transport Scotland.
Maintain
Flood
Protection
Scheme
(80330017)
G
Continue to maintain existing flood defences and
flood protection works in Comrie. These include
the Water of Ruchill Flood Protection Scheme
(constructed in the 1960s) and the flood
protection works carried out in 2013.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Comrie. Maintenance
works are carried out as required. 
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. 
Maintain
Flood
Protection
Scheme
(80350017)
G
Continue to maintain the Water of Ruchill Flood
Protection Scheme (constructed in the 1960’s)
and the flood protection works carried out in 2013
that reduce the risk of river flooding to Dalginross.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council’s Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Dalginross. Maintenance
works are carried out as required.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. 
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
Upper Earn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016-
2017
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.     
Strategic
Mapping and
Modelling
(80410019)
G
Scottish Water will carry out an assessment of
flood risk within the highest risk sewer catchments
to improve knowledge and understanding of
surface water flood risk. Scottish Water will
undertake further investigation and modelling in
the Comrie and Crieff sewer catchments to
improve knowledge and understanding of flood
risk in this area as required under Section 16 of
the Flood Risk Management (Scotland) Act 2009.
Scottish
Water
Comrie
2016 -
2018 
Crieff
2016 -
2017 
The Scottish Water assessment of flood risk within
the Comrie sewer catchment was completed in
May 2018. 
The Scottish Water assessment of flood risk within
the Crieff sewer catchment was completed in
December 2019.
This action is complete. 
Maintain
Flood
Warning
(80410030)
G
Continue to maintain the Carse of Lennoch to
Lochlane and the Crieff to Innerpeffray flood
warning areas which are part of the Earn river
flood warning scheme.
Continue to maintain the Comrie flood warning
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.

Page 75

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|70
area which covers properties at risk of flooding
from the Water of Ruchill and/or the River Earn as
part of the Ruchill river flood warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80330012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Comrie Resilience Group operates in this area.
The membership includes Perth & Kinross
Council, SEPA, Scottish Fire & Rescue and the
Scottish Flood Forum. The group aims to reduce
flooding of businesses and communities in
Comrie. The resilience group was formed as a
response to severe flooding in Comrie in August
and November 2012.
Community Ongoing The Comrie Community Resilience Group has
developed a Community Resilience Plan and
Emergency Procedures for activation during
flooding events. This will involve supporting
vulnerable residents, deploying sandbags/aqua
sacs from a community store and liaising with the
Emergency Services. 
The Scottish Flood Forum supported the Comrie
Community Resilience Group with their flood plan
but understands they are currently inactive. The
Forum is liaising with Perth & Kinross Council on
potential property flood resilience advice to
properties outwith the Comrie Flood Scheme.  
Perth & Kinross Council will continue to
coordinate with the Comrie Community
Resilience Group on a priority needs basis
where resources allow.  
The Scottish Flood Forum will continue to
liaise with the lead community contact for
Comrie. 
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Perth & Kinross Council has carried out on-going
awareness raising activity during the development
of the proposals for the Comrie Flood Protection
Scheme. Community drop-in sessions were
arranged in Comrie in September 2016 following
the completion of the flood scheme feasibility study.
Further community drop-in sessions were held in
April and May 2019 following the completion of the
scheme outline design. These events were
Further to the awareness raising described
in Table 2 of this report, Perth & Kinross
Council will continue with awareness raising
activities during the continuation of the
Comrie Flood Protection Scheme and any
other relevant actions set out in the Tay
Local Flood Risk Management Plan.

Page 76

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|71
attended by the Council, SEPA and the Scottish
Flood Forum. 
Two further community drop-in sessions took place
in June 2022 to update the local community about
the scheme detailed design and advance works.
These were attended by representatives from the
project team including Perth and Kinross Council,
SGN, Scottish Water, SSE, Sweco and Balfour
Beatty. 
The Council has maintained its project specific
website and regular newsletters have been issued
to the community to keep them informed about the
progress of the flood scheme. One-to-one meetings
with land and property owners continue. This
activity has been coordinated with the Comrie
Community Council.
The Scottish Flood Forum (SFF) has also engaged
with the local community following previous
flooding. This included initial community
engagement with both the Community Council and
the wider community, exploring possible options
regarding future SEPA and Local Authority
engagement. The SFF provided a presentation and
appropriate advice to support the short-term
strategic development of the community to deal
with flooding.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Self Help
(80410011)
G
Refer to Description in Table 2.  - Ongoing Further to the self-help actions described in Table 2
of this report, some additional progress has been
made within this PVA.
The Council’s Housing Service has fitted flood
protection products to 15 Council properties within
Comrie.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
The SFF have given independent PFR advice to a
few properties in Crieff.
Refer to planned actions described in Table
2 of this report. 
Maintenance
(80410007) G
Refer to Description in Table 2.  Perth &
Kinross and
Stirling
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 77

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/14 Comrie|72
Council,
asset / land
managers 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 78

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/15 Forteviot|73
3.2.15 Forteviot PVA 08/15 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council River Earn 
Summary of Progress Within PVA 
There are fewer than 10 residential properties and non-residential properties at risk of flooding in the
Forteviot PVA. The Annual Average Damages are approximately £15,000. Further information can
be found in Tay Local FRM Plan under PVA 08/15. 
There have been no significant weather events in this PVA since the publication of the Tay Local
FRM Plan. Widespread surface water flooding occurred during the storm of August 2020, and
approximately 11 properties were affected in Forgandenny.
SEPA have commenced flood mapping improvements in the Lower Earn area. SEPA have also
continued to provide a flood forecasting service and operate their existing flood warning system in
this PVA. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Forteviot PVA 08/15
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/15      A A  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Forteviot (PVA 08/15)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk. Approximately 900km²
of improved surface water data is currently
available within this Local Plan District. 
SEPA 2016 -
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
across Scotland and represents a significant
change in rainfall amounts compared to FEH99
dataset, as such it is no longer consider
appropriate to deliver this action as originally
intended.  This action will not be taken forwards as
described. A major national update of the surface
water maps is underway which will deliver updated
surface water flooding maps for Scotland
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next
flood risk management cycle.

Page 79

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/15 Forteviot|74
representing the latest scientific understanding.  
Strategic
Mapping and
Modelling
(80410016) A
SEPA will seek to develop flood mapping in the
Lower Earn area (from Forteviot Bridge to the
River Tay confluence) to improve understanding
of flood risk. The extent and timing of
improvements will depend on detailed scoping
and data availability.
SEPA 2016 -
2018
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time. 
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Innerpeffray to Bridge of
Earn flood warning area which is part of the Earn
river flood warning scheme. When flood events
occur in an area with an existing flood warning
service, SEPA will seek to verify the flood
forecasts and warnings. SEPA will use feedback
and post-event data to ensure that our flood
warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Widespread surface water flooding affected this
area in August 2020, affecting properties in
Forgandenny. The Council issued flood bulletins,
responded to correspondence and held a series of
online community meetings to raise awareness of
flood risk.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007)  G
Refer to Description in Table 2.  Perth &
Kinross
Council,
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 80

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/15 Forteviot|75
asset / land
managers 
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency plans/ response activities
have been carried out in this PVA, beyond those
already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 81

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/16 Dunning|76
3.2.16 Dunning PVA 08/16 
Local Plan District Local authority Main catchment
Tay Perth & Kinross Council Dunning Burn (River Earn) 
Summary of Progress Within PVA 
There are approximately 40 residential properties at risk of flooding in the Dunning PVA. The Annual
Average Damages are approximately £120,000. Further information can be found in Tay Local FRM
Plan under PVA 08/16.
Widespread surface water flooding occurred during the storm of August 2020, and approximately 11
properties were affected in Dunning.
Perth & Kinross Council undertook sediment management works to maintain channel conveyance
along the Dunning Burn in August 2018. Significant clearance works on the Dunning Burn were also
undertaken following the flooding of August 2020.
SEPA have commenced flood mapping improvements in the Middle Earn area. SEPA have also
continued to provide a flood forecasting service and operate their existing flood warning system in
this PVA.
Scottish Water has delivered an assessment of flood risk within the Auchterarder sewer catchment. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk
Management Strategy, SEPA (December
2015). 
Selected Actions in the Dunning PVA 08/16
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/16      A G  G G  G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Dunning (PVA 08/16)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
Middle Earn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016 -
2017
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time.
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates.   
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will carry out an assessment of
flood risk within the highest risk sewer catchments
to improve knowledge and understanding of
surface water flood risk. Scottish Water will
undertake further investigation and modelling in
the Auchterarder sewer catchments to improve
knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood
Scottish
Water
2016 -
2018
The Scottish water assessment of the Auchterarder
sewer catchment was completed in February 2018.     
This action is complete.

Page 82

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/16 Dunning|77
Risk Management (Scotland) Act 2009.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Innerpeffray to Bridge of
Earn flood warning area which is part of the Earn
river flood warning scheme. When flood events
occur in an area with an existing flood warning
service, SEPA will seek to verify the flood
forecasts and warnings. SEPA will use feedback
and post-event data to ensure that our flood
warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was launched
in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help urban
areas and the transport network improve their
resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Awareness
Raising
(80410013)
G
Refer to Description in Table 2.  Responsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Widespread surface water flooding affected this
area in August 2020, affecting properties in
Dunning. The Council issued flood bulletins,
responded to correspondence and held a series of
online community meetings to raise awareness of
flood risk.
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have been
limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011) G
Refer to Description in Table 2.  N/A Ongoing No additional self-help activities have been carried
out in this PVA, beyond those already described in
Table 2 of this report.
Refer to planned actions described in Table
2 of this report. 
Maintenance
(80410007) 
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing Further to the maintenance actions described in
Table 2 of this report, some additional progress has
been made within this PVA.
Perth & Kinross Council undertook sediment
management works on the Dunning Burn in August
2018. Following the flooding of August 2020, the
Council completed clearance works to remove
timber debris from the Dunning Burn and the Latch
Burn.
Refer to planned actions described in Table
2 of this report.

Page 83

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/16 Dunning|78
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA, beyond
those already described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G
Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 84

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  PVA 08/17 Bridge of Earn|79
3.2.17 Bridge of Earn PVA 08/17 
Local Plan District Local authority Main catchment
Tay Fife Council, Perth & Kinross Council River Earn 
Summary of Progress Within PVA 
There are approximately 50 residential properties and 20 non-residential properties at
risk of flooding in the Bridge of Earn PVA. The Annual Average Damages are
approximately £410,000. Further information can be found in Tay Local FRM Plan
under PVA 08/17. 
The PVA has been exposed to significant weather events including Storms Desmond
and Frank in December 2015 and January 2016 respectively, with several properties
and roads affected. In March 2018, the ‘Beast from the East’ brought about significant
levels of snow fall across the PVA, although a gradual thaw limited any flooding issues
resulting from snowmelt. Widespread surface water flooding occurred during the storm
of August 2020 and again in September 2022.
Perth & Kinross Council has continued to maintain the existing flood scheme in Bridge
of Earn and has carried out maintenance as required.
SEPA have commenced flood mapping improvements in the Lower Earn area. SEPA
have also continued to provide a flood forecasting service and operate their existing
flood warning system in this PVA.
Scottish Water have completed an assessment of flood risk in the Perth City sewer
catchment.
Awareness raising activity has been carried out by the Scottish Flood Forum.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Tay Flood Risk Management
Strategy, SEPA (December 2015). 
Selected Actions in the Bridge of Earn PVA 08/17
PVA Flood
protections
scheme/works
Flood
protection
study
Maintain flood
protection
scheme
Natural flood
management
works
Natural flood
management
study
Strategic
mapping and
modelling 
New
flood
warning 
Maintain flood
warning 
Flood
forecasting 
Community
flood action
groups
Awareness
raising
Self help 
Property level
protection
scheme 
Surface water
plan/study
Maintenance
Site protection
plans
Emergency
plans/
response
Planning
policies
08/17   G   A A G  G G G G G   G  G G 
Summary of Progress of Actions to Manage Flood Risk in Bridge of Earn (PVA 08/17)
Action (ID) Status
(RAG)
Description Delivery
Lead
Planned
Dates
Progress Made Planned Actions to Complete
Maintain
Flood
Protection
Scheme
(80400017)
G
Continue to maintain the existing Bridge of Earn
Flood Protection Scheme on the River Earn, the
Deich Burn and the Yellow Burn. The scheme
was completed in 2006 and includes flood walls
and embankments.
Perth &
Kinross
Council
Ongoing Perth & Kinross Council's Roads Maintenance
Partnership carries out routine inspections of the
existing flood defences in Bridge of Earn.
Maintenance works are carried out as required.
Routine inspections will continue to be
carried out as part of the Council's statutory
duties. Inspections will be carried out on an
annual basis and following flood events.
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to incorporate additional surface
water data into the flood maps to improve
understanding of flood risk, to be completed early
in the first flood risk management cycle.
Approximately 900km² of improved surface water
SEPA 2016 -
2017
SEPA's current Surface water hazard maps use
design rainfall estimates based on FEH99
methodology; this has now been superseded by
FEH22 methodology. The FEH22 dataset contains
the latest science and understanding of rainfall
The national surface water flooding
modelling project will be completed in 2023. 
The outputs from this will be used to update
SEPA maps early in cycle 2 and will inform
SEPA's flood risk assessments for the next

Page 85

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|80
data is currently available within this Local Plan
District. SEPA will seek to develop flood mapping
in the Lower Earn area to improve understanding
of flood risk. The extent and timing of
improvements will depend on detailed scoping
and data availability. 
across Scotland and represents a significant
change in rainfall amounts compared to FEH99
dataset, as such it is no longer consider
appropriate to deliver this action as originally
intended.  This action will not be taken forwards as
described. A major national update of the surface
water maps is underway which will deliver updated
surface water flooding maps for Scotland
representing the latest scientific understanding.  
flood risk management cycle.
Strategic
Mapping and
Modelling
(80410016)
A
SEPA will seek to develop flood mapping in the
Lower Earn area to improve understanding of
flood risk. The extent and timing of improvements
will depend on detailed scoping and data
availability.
SEPA 2016 -
2018
SEPA began working on river mapping updates in
this area but upon review of the available
information it is not appropriate to complete the
update at this time. 
A review of how modelling and mapping
updates are undertaken is being conducted
to develop a more effective method of
regional and national updates. 
Strategic
Mapping and
Modelling
(80410019) G
Scottish Water will review the assessment of flood
risk within the highest risk sewer catchments to
improve knowledge and understanding of surface
water flood risk. Scottish Water will undertake
further investigation and modelling in the Perth
City sewer catchments to improve knowledge and
understanding of flood risk in this area as required
under Section 16 of the Flood Risk Management
(Scotland) Act 2009.
Scottish
Water
2016 -
2018
The Scottish Water assessment of flood risk within
the Perth City sewer catchment was completed in
April 2019.
This action is complete.
Maintain
Flood
Warning
(80410030) G
Continue to maintain the Bridge of Earn and the
Bridge of Earn to the River Tay flood warning
areas which are part of the Earn river flood
warning scheme.
When flood events occur in an area with an
existing flood warning service, SEPA will seek to
verify the flood forecasts and warnings. SEPA will
use feedback and post-event data to ensure that
our flood warning service is timely and accurate.
SEPA Ongoing SEPA has continued to operate the flood warning
service.
SEPA will continue to operate the flood
warning service.
Flood
Forecasting
(80410009)
G
Refer to Description in Table 2.  SEPA Ongoing SEPA continues to improve the Scottish Flood
Forecasting Service with the Met Office, with daily
Flood Guidance Statements and regional Flood
Alerts issued as required to enable communities
and responders to reduce the impacts of flooding.
SEPA in partnership with the Met Office has
developed a public version of the daily Flood
Guidance Statement, the Scottish Flood Forecast,
to provide better and earlier information to the
public. A beta version of this product was
launched in May 2022. 
Options for developing forecasts of surface water
flooding have been published in 2022 to help
urban areas and the transport network improve
their resilience to and preparedness for flooding.
The Scottish Flood Forecast will be refined
in the wake of user feedback. A more
focussed version of the product, producing
guidance at a local level, is planned for the
next flood risk management cycle. 
The development and wider roll-out of
surface water flooding forecasts is being
considered alongside the technical, resource
and communication challenges associated
with providing surface water flooding
guidance.
Community
Flood Action
Groups
(80400012)
G
Community flood action groups are community
based resilience groups which, on behalf of local
residents and business, help to prepare for and
minimise the effects of flooding. They reflect the
interests of their local communities and may differ
Community Ongoing Glenfarg Community Resilience Group has been
established and a review of their emergency plan
is on-going.
Perth & Kinross Council will continue to
coordinate with the Glenfarg Community
Council on a priority needs basis where
resources allow.

Page 86

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|81
in composition and remit. There are over 60
groups already established in Scotland. The
Scottish Flood Forum provides support for both
new and existing groups.
Glenfarg Community Council operates in this
area. The community council have prepared a
community resilience plan to help prepare for and
respond to emergencies..
Awareness
Raising
(80410013)
G
Refer to Description in Table 2. 
From 2016 SEPA will engage with the community
through local participation in national initiatives,
including partnership working with 
Neighbourhood Watch Scotland. In addition,
SEPA will engage with local authorities and
community resilience groups where possible.
Local authorities will be undertaking additional
awareness raising activities. Further details will be
set out in the Local FRM Plan. 
Resonsible
authorities
Ongoing Further to the awareness raising actions described
in Table 2 of this report, some additional progress
has been made within this PVA.
Widespread surface water flooding affected this
area in August 2020. The Council issued flood
bulletins, responded to correspondence and held a
series of online community meetings to raise
awareness of flood risk. Following the flooding of
September 2022, the Council liaised with Bridge of
Earn Community Council.
The Scottish Flood Forum (SFF) engaged with the
local community following previous flooding. This
included initial community engagement with both
the Community Council and the wider community,
exploring possible options regarding future SEPA
and Local Authority engagement. The SFF
provided a presentation and appropriate advice to
support the short-term strategic development of
the community to deal with flooding. 
SEPA continues to work with others to raise
awareness of flood risk and its flood warning
service. It has participated in local activities
including school / education and community
resilience activities when able. Some planned
activities (notably in person joint events) have
been limited or delayed due to Covid-19.
Refer to planned actions described in Table
2 of this report.
Self Help
(80410011)
G
Refer to Description in Table 2.  N/A Ongoing Further to the self-help actions described in Table
2 of this report, some additional progress has
been made within this PVA.
The Scottish Flood Forum’s (SFF) community
engagement within this PVA has included property
level protection (PLP) exhibitions, selection,
surveys and the provision of appropriate and
relevant information to enable clients to make the
right decisions. The SFF has provided ongoing
community PLP training and Flood Warden and
resilience group promotion.
Refer to planned actions described in Table
2 of this report.
Maintenance
(80410007)
G
Refer to Description in Table 2.  Perth &
Kinross
Council,
asset / land
managers
Ongoing No additional maintenance activities have been
carried out in this PVA, beyond those already
described in Table 2 of this report.
The Council completed works to make safe a
collapsed retaining wall on the Deich Burn in
Bridge of Earn following the flooding of August
2020.
Refer to planned actions described in Table
2 of this report.

Page 87

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|82
Emergency
Plans/
Response
(80410014)
G
Refer to Description in Table 2.  Category 1
and 2
Responders
Ongoing No additional emergency planning/response
activities have been carried out in this PVA,
beyond those already described in Table 2 of this
report.
Refer to planned actions described in Table
2 of this report.
Planning
Policies
(80010001)
G Refer to Description in Table 2.  Planning
Authority
Ongoing No additional planning policy activity has been
carried out in this PVA, beyond that already
described in Table 2 of this report.
Refer to planned actions described in Table
2 of this report.

Page 88

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Chapter 3 |83
3.3 Other Actions 
This section sets out details of additional significant actions undertaken in the Tay Local
Plan District by local authorities to contribute to the implementation of the current actions
in the plan and the achievement of the objectives in the plan. 
Perth & Kinross Council have carried out additional actions, outwith the actions identified
within the Tay Local Flood Risk Management Plan.  These actions include: 
• Delivering on previous commitments to complete investigations into flood schemes
(at Comrie, Bankfoot and Coupar Angus) and carrying out the associated public
consultation events in late 2016. This included community drop-in sessions and
presentations to provide these communities with further information on the risk of
flooding; the outcome of the Council’s investigations into flood schemes; work to
raise awareness of flooding and help the community become more resilient to it and
other action being taken on flood risk. The events were also attended by SEPA,
Scottish Water and the Scottish Flood Forum. 
• Riverbank erosion protection works, as well as repairs to a surface water outfall,
have been carried out on the River Almond at Inveralmond, Perth. The works were
completed in December 2017 and have helped to manage the risk of surface water
flooding in the Inveralmond Industrial Estate as well as protecting the integrity of the
existing flood defences in the area. Scottish Water also completed repairs to an
adjacent drainage outfall earlier in 2017.
• Works to address surface water flooding have been carried out at Perth Harbour.
The works have helped to manage the risk of flooding to properties in the harbour
area and were completed in March 2018.
• The completion of flood study work in October 2018 for the small burns to the
southeast of Pitlochry in the vicinity of Middlehaugh of Dalshian, Easthaugh of
Ballyoukan and the Altrory Burn.
• Investigation works were completed on the North Muirton flood embankment. The
Council has installed a sheet piled cut off wall to reduce the risk of ground water
seepage during future flood events. This measure was completed in 2020 to
manage the risk of flooding to adjacent properties while protecting the integrity of
the flood defences in this area. 
• In response to the severe flooding of 11 & 12 August 2020:
o A coordinated response from various Council services and partner
organisations involving investigations, advice and support. 
o Continued work with public agencies and local resilience groups to investigate
and respond to the impact of the flooding, focusing on the homes and
businesses most affected. 
o Responses to over 650 enquiries received via the Council’s dedicated web
page and generic e-mail address.
o Nine online community meetings were held.
o On the ground works in the most affected areas to respond to, and support,
emergency works.

Page 89

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   PVA 08/17 Bridge of Earn|84
o Emergency clearance works on the Craigie Burn, the Alyth Burn and the
Dunning Burn.
o CCTV camera surveys of drainage systems and culverts
o Works to make safe a collapsed retaining wall on the Deich Burn in Bridge of
Earn.
o A report to the Council’s Environment and Infrastructure Committee on 18
August 2021, including a summary of identified short, medium, and long-term
actions. These actions were consistent with the Tay Local Flood Risk
Management Plan. 
o A review of the Council’s Out of Hours Emergency Service and flood gate
closure procedure.
• In November 2020, Scottish Water and the Council carried out the replacement of
all 8 pumps (4 foul & 4 surface water) in the South Inch Pumping Station, as part of
planned maintenance work. The remaining pumps on the Perth Flood scheme
between Inveralmond and South Inch, have been replaced over the last year.

Page 90

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  List of Acronyms and Abbreviations |85
List of Acronyms and Abbreviations 
FEH Flood Estimation Handbook
FEP Flood Emergency Plan
FLS Forestry and Land Scotland
FRM  Flood Risk Management 
ICS Integrated Catchment Study 
LFRMP  Local Flood Risk Management Plan 
LPD  Local Plan District 
PLP Property Level Protection
NFM Natural Flood Management 
PVA  Potentially Vulnerable Area 
Q&S  Quality & Standards (Scottish Water) 
RAG Red, Amber, Green 
SEA Strategic Environmental Assessment
SEPA  Scottish Environment Protection Agency 
SFFS Scottish Flood Forecasting Service
SF Scottish Forestry
SPP  Scottish Planning Policy
SR10/15  Spending Review periods for 2010-2015 and 2016-2021 for Scottish
Water capital maintenance expenditure 
SUDS Sustainable Urban Drainage System
SWMP  Surface Water Management Plan
TEAMB Tay Estuary and Montrose Basin

Page 91

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page  Annex 1 |86
Annex 1: FRM Responsibilities & Legal Requirement for this Final Report
Flood Risk Management in Scotland
The Scottish Ministers, SEPA and responsible authorities must exercise their flood risk
related functions with a view to reducing overall flood risk (refer to Section 1(1) of the
Flood Risk Management (Scotland) Act 2009). 
Through the preparation of a national flood risk assessment and setting of objectives to
reduce the level of flood risk by SEPA, which is published in the Flood Risk Management
Strategy, and the publication of Local Flood Risk Management Plans by lead local
authorities, which detail how and when the actions agreed to meet these objectives are to
be done, SEPA and all responsible authorities must act to manage flood risk in a
sustainable way. 
Flood Risk Management Strategy for the Tay Local Plan District
Local Flood Risk Management Plan for the Tay Local Plan District
Legal Requirement
This document sets out as assessment of the progress made on implementing the Local
Flood Risk Management Plan (LFRMP) for the Tay Local Plan District (LPD) as required
by Section 38 of the Flood Risk Management (Scotland) Act 2009 (the “Act”). 
38 Local flood risk management plans: final report
(1) Not earlier than 5 years, and not later than 6 years, after a local flood risk management
plan is finalised, or by such other date as the Scottish Ministers may direct, the lead
authority must publish a report on the plan containing — 
(a)  an assessment of the progress made towards implementing the current  
measures, 
(b)  a summary of the current measures which were not implemented, with reasons  
for their non-implementation, and 
(c) a description of any other measures implemented since the plan was finalised  
which the lead authority considers have contributed to the achievement of the  
objectives summarised in the supplementary part of the plan. 
(2) The lead authority must make copies of the report available for public inspection. 
The Tay Local Flood Risk Management Plan, which includes the ‘implementation part of
the Plan’, was published in June 2016. An Interim Report on the progress made on this
Plan was published in March 2019. This Final Report was therefore to be published
between December 2021 and June 2022. However, the Scottish Minister’s subsequently
directed that the Final Report be published by 31 December 2022.

Page 92

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   Annex 1|87
The Final Report provides a summary of the Tay Local Flood Risk Management Plan
actions (‘measures’) and assessment of the progress made towards implementing them.
The information on progress includes: 
• an assessment of the progress made towards implementing each of the actions.
• reasons for any actions where delivery is not as planned; and
• a summary of the actions which have not been implemented, with reasons why they
were not implemented; and
• a description of arrangements planned to deliver the remaining actions and to address
delayed actions; and
• a description of any other actions implemented since the Plan was finalised. which the
lead authority considers have contributed to the achievement of the objectives
summarised in the Plan. 
The Final Report is published by the lead authority as defined by Section 34(9) of the Act
in partnership with SEPA and the responsible authorities, as defined by Section 5 of the
Act. The approval of the Final Report will be in accordance with the agreed governance
arrangements for the Local Plan District Partnership. The responsible authorities for the
Tay LPD Partnership are: 
• Perth & Kinross Council (lead authority)
• Angus Council
• Fife Council
• Stirling Council
• SEPA
• Scottish Water
• Loch Lomond and the Trossachs National Park
• Cairngorms National Park
• Scottish Forestry 
Publication
The published Final Report for the Tay LFRMP will be made available for public inspection,
as per Section 37(2) of the Act, via the website of the lead authority, Perth & Kinross
Council: 
http://www.pkc.gov.uk/frmplans 
Links to the published Final Report for the Tay Local Flood Risk Management Plan will
also be provided from Scottish Government, SEPA and other responsible authority
websites. 
A hard (paper) copy of the published Interim Report for the Tay LFRMP is also available
for public inspection at the following location(s): 
(1) Pullar House, 35 Kinnoull Street, Perth PH1 5GD

Page 93

Final Report: Tay Local Flood Risk Management Plan
Return to Contents Page   Annex 1|88
(2) Auchterarder Library, Chapel Wynd, Auchterarder PH3 1BL
(3) Blairgowrie Area Office, 46 Leslie Street, Blairgowrie PH10 6AQ
(4) Crieff Area Office, 32 James Square, Crieff PH7 3EY
(5) Pitlochry Area Offices/Library, 26/28 Atholl Road, Pitlochry PH16 5BX
(6) Breadalbane Community Campus, Crieff Road, Aberfeldy PH15 2DU
(7) Loch Leven Community Campus & Library, The Muirs KY13 8FQ 
during the hours of 8.45 a.m. to 5.00 p.m., Mondays to Fridays inclusive, except 8.45am to
11am on the first Thursday of every month. 
Copies of the published Final Report for the Tay Local Flood Risk Management Plan may
also be available at offices of other responsible authorities. Those persons living in the
Angus, Stirling and Fife Council areas of the Tay District should contact their own local
authority in the first instance: 
Angus Council ACCESS line  03452 777 778
Fife Council General Enquiries  03451 550 000
Stirling Council General Enquiries 01786 404 040