Summary of Responses to Public Consultation 
Tay Local Plan District 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1    Member of
the public 
Noted flooding in some
areas of Perth City and
Bridge of Earn; that
package of proposed
objectives was too vague;
wanted to hear more about
maintenance, river
dredging, use of beavers,
flooding of set aside
agricultural land, etc; work
should begin immediately. 
The Tay Local FRM Plan
includes various actions for
both Perth and Bridge of Earn,
including flood studies and a
surface water management
plan. More detail on the
objectives and actions –
including timescales - has
been provided in the final
published Plan. The Plan will
also include maintenance
actions.
2    Member of
the public 
A member of the public in
Perth is concerned that their
property has flooded
multiple times because of
heavy rain and blocked
drains. They are concerned
that this will happen again.  
The Tay Local FRM Plan
includes various actions to
manage the risk of flooding
including various flood studies,
a surface water management
plan and maintenance works.
Perth & Kinross Council’s
Roads Maintenance
Partnership carry out
maintenance of road drainage
systems. Road defects
(including blocked gullies) can
be reported to the Council via
their website.
3    Member of
the public 
A resident of Wallace
Crescent and Fairfield,
Perth expressed concern
that this area is not
mentioned, despite previous
repeated flooding of their
property. They are looking
for reassurance that this will
be considered. They
expressed concern about
development in the area,
the lack of upgrades or
improvements to the
existing drainage system
and the time required for
improvements. 
This area is located within the
Perth PVA (02/08/12) and
Objective Target Area (OTA)
253. The proposed Tay Local
FRM Plan includes specific
actions for the area that are
intended to bring about a
reduction in flood risk. These
actions include the on-going
Perth SWMP. Perth & Kinross
Council also invested in road
drainage improvements on
Wallace Crescent in 2021 to
reduce the risk of flooding.

Page 2

4  Member of
the public 
A resident in Aberfeldy is
concerned about the visual
impact and access issues
associated with the
proposal to build a flood
wall as part of the Aberfeldy
Flood Scheme. 
The respondent noted
involvement in the local
community resilience plan
and in reporting blocked
street drains to the local
authority. 
The Tay Local FRM Plan
includes an action for a new
flood protection scheme in
Aberfeldy. Any issues
associated with visual impact
and access will be addressed
during the outline design of the
flood scheme via further public
consultation and the
Environmental Impact
Assessment.
In the meantime, the Council
welcomes local efforts to
improve flood resilience in
Aberfeldy.
5    Member of
the public 
A local resident who lives
next to the Craigie Burn in
Perth flooded last year and
expressed concern that
flooding has become more
frequent. They requested
quick action be taken by
pumping water away, noting
issues with surface water,
sewer flooding, issues with
flood gates, property
insurance costs, SUDS and
storage ponds. They have
taken steps to protect their
home and liaise with local
councillors. 
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253), including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study and the Perth SWMP.
The Plan also includes self-
help and awareness raising
actions.
It is individual property owners’
responsibility to protect
themselves and their assets
from flooding.
6    Member of
the public 
A resident in Craigie, Perth
noted concern that
development has increased
flood risk and that the
objective should include
infrastructure upgrades.
They noted that some
maintenance work has
helped matters but more
requires to be done. The
resident noted that they
have previously raised
issues, but they have not
been acted on, and
suggested a community
meeting. They also note
that they monitor flooding in
the Craigie area and have
reported this to the Council.
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253), including the on-going
maintenance of the existing
Perth Flood Scheme, the on-
going Craigie Burn Flood
Study, and the Perth SWMP.
The Council has already
undertaken public consultation
in connection with these
issues.
The proposed Plan also
includes other actions
including:
• Land Use Planning - all new
development is required to
comply with national and

Page 3

local planning policies, the
Council’s Supplementary
Guidance and to include
SUDS to manage surface
water.
• Maintenance - of
watercourses, road drainage
and existing flood defences.
The Council welcomes local
efforts to improve flood
resilience in Perth.
7  Member of
the public 
A local resident in
Blairgowrie & Rattray noted
that localised flooding in
rural Perthshire could be
mitigated in a cost-effective
way by improved ditch and
verge maintenance. The
resident noted the proposed
actions and timescales are
‘non-committal’ and won’t
be adhered to. They have
carried out their own verge
maintenance works.
The Tay Local FRM Plan
includes maintenance of
watercourses. Perth & Kinross
Council’s Flooding team
inspect and assess bodies of
water and carry out clearance
and repair works, where this
will substantially reduce flood
risk. The primary responsibility
for avoiding or managing flood
risk remains with landowners.
Actions and timescales will be
set out in the published Plan
and interim and final reports
will also be published setting
out the progress made.
The Council welcomes local
efforts to improve flood
resilience in Blairgowrie &
Rattray.
8    Member of
the public 
A local resident in Alyth
noted two floods in 6 years
and expressed concern
about waiting until 2028 for
a plan to be made. They
noted the action taken by
the local community to
protect properties but noted
that the Council should do
more. They also noted the
need for more radical action
to prevent flooding by
creating an artificial flood
plain to the north of the
town.  
The Tay Local FRM Plan
includes a number of on-going
actions to manage flood risk in
Alyth.
In particular, Perth & Kinross
Council are currently
undertaking a Natural Flood
Management (NFM) Study in
Alyth. The study will explore
the potential options for flood
risk management measures in
this area, including NFM and
flood storage. 
9    Member of
the public 
A local resident in
Blairgowrie and Rattray
noted that the timescales for
The Tay Local FRM Plan will
set out the current timescales
for actions in Blairgowrie and

Page 4

actions are not quick
enough. 
Rattray.  This area is currently
the focus of an on-going
surface water management
plan which will consider the
potential means of managing
and, where achievable,
reducing flood risk in this area.
10  Member of
the public 
A member of the public in
Pitlochry agreed that the
main communities and
infrastructure had been
identified and with the
proposed objectives for this
area.
No response required.
11  Member of
the public 
A member of the public
noted that Dunning was not
listed in the consultation. 
Dunning was included within
PVA 08/16 in the Cycle 1 FRM
Plans, however, following the
2nd national flood risk
assessment in 2018, this area
has been re-assessed as
having a lower level of flood
risk. Dunning is therefore no
longer designated as a PVA.
However, the area is covered
by the proposed LPD-wide
actions set out in the Tay
Local FRM Plan. 
12  Member of
the public 
A member of the public in
Coupar Angus noted that: 
• flood risk is preventing
development and that
development elsewhere
has increased flood risk;
• watercourses are flowing
slower due to overgrown
vegetation and silt. 
• the A93 road should be
raised to prevent road
closures and delayed
emergency access due to
flooding.
• flood defences would
prevent flooding in
Coupar Angus but this
would move the problem
elsewhere.  
The Tay Local FRM Plan
includes actions to manage
flood risk in this area, including
the land use planning action.
All new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood
risk remains with landowners. 
The Council’s previous flood
study considered the potential
options for reducing flood risk

Page 5

in Coupar Angus but
unfortunately did not identify
an economically viable flood
scheme. Flood risk will
therefore continue to be
managed as set out in the Tay
Local FRM Plan. 
13  Member of
the public 
A member of the public in
Perth noted:
• 8 flood events on the
Craigie Burn since 1981;
• concern about increased
flood risk due to
development and global
warming;
• the lack of scope for
improving existing flood
defences, e.g.
bottlenecks and culverts
in the Craigie Burn, and
the limited benefit of
maintenance works;
• that the pace of FRM is
too slow to keep pace
with the increased
frequency of flooding;
• that local residents need
to be kept informed of
any local works;
• the on-going risk to
property and people and
the associated costs;
and
• it is the public authorities
job to manage flood risk.   
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253) and in particular the on-
going maintenance of the
existing Perth Flood Scheme,
the on-going Craigie Burn
Flood Study and the Perth
SWMP. The Council has
already undertaken public
consultation in connection with
these issues and the
associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all
new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance
and to include SUDS to
manage surface water.
• Maintenance - of
watercourses, road
drainage and existing
flood defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce
flood risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners.
14  Member of
the public 
A member of the public in
Perth noted the increasing
frequency of flooding; the
increase in flood risk due to
development; the need to
improve drainage and not
rely on existing drainage or
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253) and, in particular, the on-
going maintenance of the
existing Perth Flood Scheme,

Page 6

watercourses such as the
Craigie Burn; the need for
improved communication on
actions being taken; that the
scale of the flooding over
the last 20 years has been
understated; that the
timescales for action are too
slow and that interim
changes are also required.  
the on-going Craigie Burn
Flood Study and the Perth
SWMP. The Council has
already undertaken public
consultation in connection with
these issues and the
associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all
new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance
and to include SUDS to
manage surface water.
• Maintenance - of
watercourses, road
drainage and existing flood
defences. 
15  Member of
the public 
A local resident in Perth
noted:
• that flooding wasn’t
happening ‘once every
200 years’ – there had
been 8 flood events on
the Craigie Burn since
1981; 
• concern about
increased flood risk due
to development; 
• concern about how
SUDS operate and if
they deal with older
development;
• concern about flooding
on the Craigie Burn due
to small culverts and
blockages and the
impact on flooding of
adjacent properties;
• concern that dredging
of the Craigie Burn
increases flood risk
downstream;
• disappointment that
Perth & Kinross Council
appear to be blaming
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253) and in particular the on-
going maintenance of the
existing Perth Flood Scheme,
the on-going Craigie Burn
Flood Study and the Perth
SWMP. The Council has
already undertaken public
consultation in connection with
these issues and the
associated timescales.
The Plan also includes other
actions including:
• Land Use Planning - all
new development is
required to comply with
national and local planning
policies, the Council’s
Supplementary Guidance
and to include SUDS to
manage surface water.
• Maintenance - of
watercourses, road

Page 7

householders for the
flooding, while allowing
development further
upstream;
• the damage done due
to surface water
flooding; and; 
• that action to manage
flood risk is too slow –
flooding is more
frequent; and
• that more
communication is
required from the
Council.
drainage and existing flood
defences.
While certain public authorities
have a duty to manage and,
where achievable, reduce
flood risk overall, the primary
responsibility for avoiding or
managing flood risk remains
with land and property owners.  
16  Member of
the public 
A local resident on the
Cavendish Avenue area of
Perth noted concern about
increasing flooding and
health impacts due to the
limited capacity of the sewer
system outside their
property and development
elsewhere in the catchment.
This has been an issue for
15-16 years, and they feel
that the sewer requires to
be upgraded. The resident
doesn’t feel able to act as
this may increase flood risk
to adjacent properties.  
The Tay Local FRM Plan
includes actions to manage
flood risk in this area (the
Perth PVA 02/08/12 and OTA
253). In particular, there is an
on-going IFOS (Internal
Flooding due to Overloaded
Sewers) study being carried
out jointly between Scottish
Water and Perth and Kinross
Council to consider the
potential means of managing
and, where achievable,
reducing flood risk to
properties in the vicinity of
Cavendish Avenue.
Community drop-in sessions
will be held early in 2023 to
disseminate the findings of this
study. 
17  Member of
the public 
A member of the public in
the Tomcroy Terrace area
of Pitlochry noted concern
that the flood map omits to
show the flood risk to their
neighbours property, which
has been affected twice by
an adjacent small burn and
surface water run off from
fields. They noted they may
be able to help the local
community resilience group.  
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Tomcroy Terrace is affected
by flooding from the Wester
Kinnaird Burn which was fully
considered by the more
detailed modelling work
carried out under the Pitlochry
Flood Study. The study
recommended a new
watercourse diversion channel
on the Wester Kinnaird Burn at

Page 8

Tomcroy Terrace, as part of
the wider proposals for a flood
scheme in this area. The
proposed scheme is included
as one of the actions for this
area (the Pitlochry PVA
02/08/02 and OTA 254) in the
Tay Local FRM Plan.
The Council welcomes local
efforts to improve flood
resilience in Pitlochry.
18  Member of
the public 
A member of the public
noted concern about an
increase in flood risk due to
development.
The Tay Local FRM Plan
includes actions to manage
flood risk, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
19  Member of
the public 
A member of the public in
Comrie agreed that the
main communities and
infrastructure had been
identified and agreed with
the proposed objectives for
this area.
No response required. 
20  Member of
the public 
A member of the public in
Bridge of Earn is concerned
that the Oudenarde and
Brickhall industrial sites are
not included within the
objective target area (OTA).
They noted concern about
the proposed objectives
don’t include tributaries to
the River Earn, and need to
address the flat topography
which limits surface water
drainage. They also noted
concern that the timescales
for actions were too long.   
The Tay Local FRM Plan
includes actions to manage
flood risk in Bridge of Earn
(PVA 02/08/14 and OTA 205).
The development site at
Oudenarde and the Brickhall
Industrial site both fall outwith
OTA 205, although they are
within PVA 02/08/14. The flood
risk on these sites is being
managed through the land use
planning action which applies
across the whole of the local
plan district.
The proposed objectives do
not mention any watercourses
but instead refer to the
management of flood risk.
Flood risk from any bodies of
water and their tributaries will
therefore be considered. The
Deich and Yellow Burns have

Page 9

been noted against the
‘Maintain flood protection
scheme’ action.
The Plan also includes a Flood
study to better understand the
integrated flooding
mechanisms in Bridge of Earn
(including surface water) and
the potential works required to
reduce flood risk in the future. 
The timescales for all of these
actions have been set out in
the published Plan.
21  Member of
the public 
A member of the public
noted that all vulnerable
areas should be identified,
and this should not be
limited to affected houses,
but should also include
infrastructure. They note
that Forgandenny isn’t
included, despite previous
flooding, and that the flood
risk maps do not show
previous flooding. They
noted that support is
required from both Perth
and Kinross Council and
SEPA and noted concern
that current legislation does
not force rural landowners
to cooperate on natural
flood measures within their
land.    
The potentially vulnerable
areas (PVA’s) were set out in
the second national flood risk
assessment, published in
December 2018. This
assessment considered
homes, businesses and
infrastructure.
Forgandenny is not within one
of the areas designated as a
PVA in 2018. Even though
there has been previous
flooding, the level of flood risk
is not significant enough for
this area to be included within
a PVA.
SEPA’s indicative flood maps
do not always show flooding
on small watercourses (due to
their limited catchment size).
Notwithstanding the above,
actions have been set out in
the Tay Local FRM Plan to
manage flood risk across the
local plan district and these
apply to Forgandenny.
While current legislation does
not force rural landowners to
undertake flood measures on
their land, landowners remain
responsible for managing or
avoiding flood risk.
22  Member of
the public 
A member of the public in
Coupar Angus agreed that
the main communities and
infrastructure had been
identified and agreed with
No response required.

Page 10

the proposed package of
objectives.
23  Local
business 
A local business owner in
Aberfeldy noted that the
underlying causes of
flooding (the
mismanagement of the
moorlands in Highland
Perthshire) have not been
fully addressed. Work and
legislation should be
introduced immediately.
They noted that banning
grouse shooting, stopping
muir burning and moorland
ditchwork, and tree planting
would help.  
The Tay Local FRM Plan
includes actions to manage
flood risk in Aberfeldy (PVA
02/08/03 and OTA 183). This
area was fully considered by
the Aberfeldy Flood Study
which was completed in 2019.
The study considered a long
list of options (including land
management techniques) and
recommended a flood scheme
involving new flood defences
in the town. The study findings
were disseminated to the local
community via drop-in
sessions on 20 and 25 June
2019.  
24  Community
body 
Earn Community Council
agreed that the main
communities and
infrastructure had been
identified and agreed with
the proposed objectives,
actions and timescales for
the Bridge of Earn area.
The community council
noted that the local
community can help to limit
surface water runoff due to
monoblocking/ surfacing of
private land and by
implementing natural flood
management.   
Perth and Kinross Council
welcomes local efforts to
improve flood resilience in
Bridge of Earn. 
25  Other
organisation 
A group of 72 healthcare
professionals in Tayside
and North Fife issued an
open letter to Tayside and
Fife Councillors, in support
of climate mitigation for
public health. The group are
concerned that the
worsening climate crisis is a
public health emergency,
due to several factors
including worsening
extreme weather, such as
heavy rain and flooding.
Creating green and blue
The publication of the second
Tay Local FRM Plan is one of
the key actions to help us
adapt to climate change. As a
society, we need to take action
to manage the risk of flooding
and its impacts on our lives,
recognising that the risk can’t
ever be removed entirely. This
plan takes our knowledge and
understanding of flooding and
the impacts of climate change
and turns it into a set of
actions that are planned,
prioritised and co-ordinated to

Page 11

spaces can provide health
benefits; adaptation is
required to cope with
increased rainfall, and the
risk of flooding as climate
change worsens.  
tackle flooding in the
communities where it affects
us the most. 
Flooding needs to be
managed sustainably so that
flood risk is reduced without
moving the problem
elsewhere. It must be done in
a way that contributes to the
health and wellbeing of
communities, supports the
protection and regeneration of
the environment, improves
resilience to climate change
and enables a sustainable
economy. Actions are needed
on all sources of flooding –
including from rivers, the sea,
surface water and
groundwater – to meet the
needs of present and future
generations while also
protecting and enhancing the
environment.
26  Other
organisation 
NatureScot noted that they
had previously contributed
to the 2018 NFRA
consultation and were in
general agreement with this
consultation. They provided
various detailed comments
on the proposed actions in
various OTA’s and the need
for an HRA to cover some
of these, due to on-going
and proposed actions within
Special Areas of
Conservation (SAC).
NatureScot also reiterated
that Natural Flood
Management (NFM) should
be used where possible to
reduce flood risk.  
NatureScot’s comments will
inform the various future
actions to be taken on flood
risk.
The Council has undertaken a
Habitats Regulations
Assessment as part of
development of the Tay Local
FRM Plan and has consulted
with NatureScot on this.  
NFM is considered in the
development of the Tay Local
FRM Plan and in the long list
of actions considered as part
of any individual flood studies.  
27  Elected
members 
Two of the Ward 10 elected
members) in Perth &
Kinross Council noted
concern about various
flooding issues in Perth
including:
The Tay Local FRM Plan on-
going includes actions to
manage flood risk in this area
(the Perth PVA 02/08/12 and
OTA 253); in particular, the
maintenance of the existing
Perth Flood Scheme, the

Page 12

• Surface water flooding
from the M90 motorway
and the Broxden Park &
Ride facility;
• Operation of the flood
storage ponds at
Broxden;
• Maintenance of the
Scouring and Craigie
Burns;
• Arrangements for
developers completing
works and handing
them to the Council for
adoption;
• Flood gate closures on
the Perth Flood
Scheme;
• River and surface water
flooding at various
locations.
Craigie Burn Flood Study, the
Perth SWMP and the Perth
IFOS Project. 
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk. 
The Council also works with
developers to ensure that any
issues are fully addressed
prior to adoption. 
The primary responsibility for
avoiding or managing flood
risk remains with landowners.
A separate detailed response
was sent to the elected
members by e-mail on 25
January 2022.
28  Local
Authorities 
Perth & Kinross Council’s
flooding team made
comments specific to
various OTA’s; provided
updates for the prioritisation
of proposed Cycle 2 flood
schemes and flood
protection works; noted
concern over the lack of any
Scottish Water actions; and
suggested that Scottish
Foresty/Forestry & Land
Scotland should be
including objectives and
actions within the published
FRM Plans. No comment
was made by other services
within the Council.
N/A 
Tay Estuary & Montrose Basin Local Plan District 
No consultation responses were received.

Page 13

Forth Local Plan District 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1    Member of
the public 
A member of the public in
Blackford raised concern
that their property has been
designated as being at risk
of flooding from the Danny
Burn, despite it not having
flooded. They are
concerned that this is
increasing their buildings
insurance.
It is acknowledged that not all
properties within the boundary
of a PVA or OTA are at risk of
flooding. Even though a
property may not have
flooded, there may still be a
risk that flooding could occur in
the future in a higher
magnitude event. We would
need to know which property
you are referring to, in order to
comment further.
2 Local
Authority
Perth and Kinross Council’s
flooding team provided an
update for the prioritisation
of the proposed Cycle 2
Blackford Flood Protection
Scheme.
No response required.
3 Other
Organisation
NatureScot noted the
opportunities for joint
working on a priority basis.
Perth and Kinross Council will
continue to liaise with
NatureScot in relation to any
flood risk management
actions. 
Forth Estuary Local Plan District 
No  Respondent  Brief Summary of Issues
Raised 
Lead Authority Comments 
1    Member of
the public 
A resident in Drum queried
why the area wasn’t
included within a PVA,
despite having a large
catchment area, limited size
of culverts under the A977,
a high water table and
previous incidences of
property flooding.
They also raised concern
about the impact of
development of flood risk
The potentially vulnerable
areas (PVAs) were set out in
the second national flood risk
assessment, published in
December 2018. The village of
Drum is not within one of the
areas designated as a PVA at
that time. Even though there
has been previous flooding,
the level of flood risk is not
significant enough for this area

Page 14

and noted that action should
be taken quickly. 
to be included within a
designated PVA.
Notwithstanding the above,
actions have been set out in
the proposed Forth Estuary
Local FRM Plan to manage
flood risk across the local plan
district and these apply to
Drum.
The proposed Forth Estuary
Local FRM Plan includes
actions to manage flood risk in
this area, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, Perth &
Kinross Council’s
Supplementary Guidance and
to include SUDS to manage
surface water.
2 Member of
the public
A resident in Milnathort
noted concern about a lack
of integrated thinking and
communication in relation to
development and planning
enforcement and flood risk.
They noted concern about
the Athron Hill development
having no water or sewage
provision, and water
draining to the back Burn
which floods Milnathort.
They noted that prevention
in the past would have been
better than reacting to
crises in the future.  
The proposed Forth Estuary
Local FRM Plan includes
actions to manage flood risk in
this area, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, the Council’s
Supplementary Guidance and
to include SUDS to manage
surface water. 
3 Community
Body
The Kinross Flood
Resilience Group submitted
21 questions relating to
FRM work in Kinross
including timescales,
barriers to commencement,
publication of the Local
FRM Plan, funding,
cost/benefit analysis, which
authorities are responsible,
SEPA’s on-going
involvement,
communications, notice
The responsibilities for
delivery, timescales,
coordination, and funding
arrangements for FRM actions
in Kinross will be set out in the
Forth Estuary Local FRM Plan
which is due for publication in
December 2022.
The published Plan will include
an action for the South Kinross
Flood Protection Scheme and
further details will be provided
to the local community via

Page 15

periods, access to private
property, and the proposed
details for the South Kinross
Flood Scheme including
consultation on the flood
scheme, property
insurance, contact details
and temporary flood risk
during construction.
They agreed with the
proposed actions but noted
that expansion of the
waterways (both natural and
piped) would also benefit
the area.
The group noted that they
can respond during a flood
and could do so more
effectively with support from
PKC and the Community
Council. They are
considering use of the
‘Rivertrack’ water level
monitoring system and they
noted monitoring drains in
the area, with a view to
getting them cleared more
effectively.
public consultation in due
course.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood
risk remains with landowners.
The proposed Forth Estuary
Local FRM Plan includes a
Community resilience group
action and the Council will
continue to liaise with the
group on this. The Plan also
includes an emergency plans
action, which enables the
provision of an emergency
response during flood events.
Perth and Kinross Council
welcomes local efforts to
improve flood resilience in
Kinross.
4 Elected
member
A Ward 8 elected member
from Perth & Kinross
Council noted concern that
the village of Drum had not
been included within a PVA
despite a high water table
and previous flooding in the
area. They also noted
concern about development
and flood risk, the WWTW
capacity, and suggested a
ditch management scheme
for the area.
The potentially vulnerable
areas (PVA’s) were set out in
the second national flood risk
assessment, published in
December 2018. The village of
Drum is not within one of the
areas designated as a PVA at
that time. Even though there
has been previous flooding,
the level of flood risk is not
significant enough for this area
to be included within a
designated PVA.
The proposed Forth Estuary
Local FRM Plan includes
actions to manage flood risk in
this area, including the land
use planning action. All new
development is required to
comply with national and local
planning policies, the Council’s
Supplementary Guidance and

Page 16

to include SUDS to manage
surface water.
Perth & Kinross Council’s
Flooding team inspect and
assess bodies of water and
carry out clearance and repair
works where this will
substantially reduce flood risk.
The primary responsibility for
avoiding or managing flood
risk remains with landowners.