Democracy Spraffa

Appendix 4

Perth and Kinross Council · 16 November 2022
Back to Climate Change and Sustainability Committee — 16 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Page 1 of 4 
Appendix 4 - Invergowrie NFM Study – Plans of Potential Options 
Option 1 In channel measures to attenuate flows along the upper Fowlis
Burn including riparian planting, leaky dams, and woodland
management in Fowlis Den. 
Option 2 Catchment wide measures including reforestation, distributed
surface water storage, and sustainable land management
practices.

Page 2

Page 2 of 4 
Option 3 Structural measures including de-culverting sections of the Fowlis
Burn, incorporating a bypass channel close to Fowlis, and
removing embankments to reconnect the Fowlis Burn with its
floodplain.

Page 3

Page 3 of 4 
Option 4 Direct flood defences within Invergowrie including walls upstream
and downstream of Main Street and Burnside Road.

Page 4

Page 4 of 4 
Option 5 Non-structural measures such as more frequent and extensive
inspection visits of structures in the upper catchment; the
promotion of sustainable land management (such as enhanced
flood water storage or woodland planting), property buy-back,
awareness raising, and updates to local planning policies to
consider flood plain management. 
(No Drawing).