Appendix 1
Table 1: Option Appraisal Summary Table 
Option 1 
Maintenance plus small flood defence
ancillary works 
(The Cross and Abercairney Place) 
Option 2 
Property Level Protection (PLP) (residential
properties only) 
Option 3 
Direct Flood Defences (Tullibardine &
Highland Spring) + Property Level
Protection (PLP) (residential properties) 
Option 4 
Diversion Channel (Danny Burn / Back
Burn / Kinpauch Burn) plus Direct
Defences (Highland Spring) plus Natural
Flood Management 
All properties protected
(200 year event)?
No  No  Yes  Yes 
Initial Capital cost  £841,769 £192,000 £4,635,345 £7,823,860
Benefit:Cost Ratio 1.4 2.9 1.77 1.36
Assessment of option Option doesn’t fully meet study objectives. 
Only defends The Cross and Abercairney
Place.  Other properties still at risk. 
Repeated dredging not recommended on
environmental grounds. 
Option doesn’t fully meet study objectives. 
PLP not suitable for non-residential
properties, which therefore remain at risk. 
Flood protection relies on measures being
installed properly by homeowners (in
advance of flooding), and suitable
maintenance. 
Typical life span of around 20-30 years
before replacement required. 
Uptake of PLP measures is historically poor. 
Only effective up to certain flood depths
(typically 0.6m) – modelled 1 in 200 year
flood depths are up to 0.4m (for residential
properties).
All properties offered a degree of
protection but see below. 
Flood protection provided by PLP relies on
measures being installed properly by
homeowners (in advance of flooding), and
suitable maintenance. 
Typical life span of PLP around 20-30
years before replacement required also. 
Uptake of PLP measures is historically
poor. 
PLP only effective up to certain flood
depths (typically 0.6m). – modelled 1 in
200 year flood depths are up to 0.4m (for
residential properties). 
All properties defended – plus benefit to
the A9. 
Diversion works are remote from the
village thereby reducing impact (both
during construction and longer-term).   
Visual impact of direct defences also
limited. 
NFM opportunities through reuse of
material claimed on site during
construction.   
Potential for multiple benefits
(biodiversity/habitat creation/amenity)
along diversion routes and NFM. 
Option 1 is not recommended Option 2 is not recommended Option 3 is not recommended Option 4 is recommended