Appendix A - Plan of Proposed Scheme Design
Perth and Kinross Council · 16 September 2026
Back to Climate Change and Sustainability Committee — 16 September 2026 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
CLASHBURN ROAD MONTGOMERY WAY HIGH STREET HIGH STREET IBE1585_FO_2001 IBE1585_FO_2004 IBE1585_FO_2003 IBE1585_FO_2003 IBE1585_FO_2002 IBE1585_FO_2006 IBE1585_FO_2007 IBE1585_FO_2008 SOUTH QUEICH HOPEFIELD PLACE CULVERT UPGRADE CLASH BURN DIVERSION CULVERT CLASH BURN BUND SMITH STREET DIVERSION CULVERT SOUTH QUEICH DIRECT DEFENCES EXISTING SERVICES DRAWING SEE DRAWING IBE1585_002 - 004 IBE1585_FO_2010 CLASH BURN CLASH BURN IBE1585_FO_2010 A977 IBE1585_FO_2005 M90 UPSTREAM STORAGE AREA URY BURN IBE1585_FO_2009 0 0 5 0 1 0 0 1 5 0 2 0 0 2 2 9 SITE LOCATION UPSTREAM WORKS IN TOWN WORKS 1. Flood Risk Management (Scotland) Act 2009 This plan is in accordance with the requirements of section 60 and schedule 2 of the flood risk management (Scotland) act 2009. This plan is to be read in conjunction with the South Kinross flood protection scheme descirption 2024 2. Existing Services. Information received from statutory undertakers has been used to identify locations of services.Exact locations of these services will be determined during detailed design. Service diversions are required to enable to construction of the scheme. Diversion of Services will be carried out by or on behalf of the statutory undertaken under its own statutory powers, not the local authority under the act. All service locations have been identified and will be protected or diverted as appropriate; specifications and working methods will be agreed with the relevant undertakers prior to construction. 3. Issue of Drawings. Hard copies, dwf and pdf will form a controlled issue of the drawing. All other formats (dwg, dxf etc.) are deemed to be an uncontrolled issue and any work carried out based on these files is at the recipients own risk. RPS will not accept any responsibility for any errors arising from the use of these files, either by human error by the recipient, listing of un-dimensioned measurements, compatibility issues with the recipient's software, and any errors arising when these files are used to aid the recipients drawing production, or setting out on site. 4. Legend Proposed Embankment Proposed Hard Defences Proposed Culvert Proposed Flood Storage Area Control Structure River Limits of Land Affected by the operations and of land upon which entry may be required for the purpose of carrying out the operations and executing temporary works Indicates Drawing Location Indicates Drawing Number NOTES 50m SCALE 1:2500 checkamendmentsrev date T +44 (0) 28 90 667914 F +44 (0) 28 90 668286 W www.rpsgroup.com/ireland E ireland@rpsgroup.com Elmwood House 74 Boucher Road Belfast BT12 6RZ Drawing Number Project Number Sheet Size Client Revision Drawing Scale Project Title Status Approved By Drawn By Checked By Date South Kinross Flood Protection Scheme Scheme Key Plan Flood Protection Operations IBE1585 A1 As Shown IBE1585_FO_2000 NM F01 C AMcG SP 12/03/2024 50m SCALE 1:2500 UPSTREAM WORKS IN TOWN WORKS A NM 30/11/2023Draft FRM ActNotification IBE1585_FO_**** 500m SCALE 1:25,000 THIS IS THE PLAN MARKED IBE1585_FO_2000 REFERRED TO IN THE FLOOD PROTECTION SCHEME FOR SOUTH KINROSS FLOOD PROTECTION SCHEME 2024 PROPER OFFICER (Signature) FOR PERTH AND KINROSS COUNCIL (date) B NM 01/02/2024FRM Act Notification Client Comments C NM 12/03/2024Final FRM Act Notification