Page 1

CLASHBURN ROAD
MONTGOMERY WAY
HIGH STREET
HIGH STREET
IBE1585_FO_2001
IBE1585_FO_2004
IBE1585_FO_2003
IBE1585_FO_2003
IBE1585_FO_2002
IBE1585_FO_2006
IBE1585_FO_2007
IBE1585_FO_2008
SOUTH QUEICH
HOPEFIELD
PLACE
CULVERT
UPGRADE
CLASH
BURN
DIVERSION
CULVERT
CLASH
BURN
BUND
SMITH
STREET
DIVERSION
CULVERT
SOUTH QUEICH
DIRECT DEFENCES
EXISTING SERVICES DRAWING
SEE DRAWING IBE1585_002 - 004
IBE1585_FO_2010
CLASH BURN
CLASH BURN
IBE1585_FO_2010
A977
IBE1585_FO_2005
M90
UPSTREAM
STORAGE
AREA
URY BURN
IBE1585_FO_2009
0
0
5
0
1
0
0
1
5
0
2
0
0
2
2
9
SITE LOCATION
UPSTREAM WORKS
IN TOWN WORKS
1. Flood Risk Management (Scotland) Act 2009
This plan is in accordance with the requirements of section 60 and
schedule 2 of the flood risk management (Scotland) act 2009.
This plan is to be read in conjunction with the South Kinross flood
protection scheme descirption 2024
2. Existing Services.
Information received from statutory undertakers has been used to
identify locations of services.Exact locations of these services will be
determined during detailed design.
Service diversions are required to enable to construction of the
scheme. Diversion of Services will be carried out by or on behalf of
the statutory undertaken under its own statutory powers, not the local
authority under the act. All service locations have been identified and
will be protected or diverted as appropriate; specifications and
working methods will be agreed with the relevant undertakers prior to
construction.
3. Issue of Drawings.
Hard copies, dwf and pdf will form a controlled issue of the drawing.
All other formats (dwg, dxf etc.) are deemed to be an uncontrolled
issue and any work carried out based on these files is at the
recipients own risk. RPS will not accept any responsibility for any
errors arising from the use of these files, either by human error by
the recipient,  listing of un-dimensioned measurements, compatibility
issues with the recipient's software, and any errors arising when
these files are used to aid the recipients drawing production, or
setting out on site.
4. Legend
Proposed Embankment
Proposed Hard Defences
Proposed Culvert
Proposed Flood Storage Area
Control Structure
River
Limits of Land Affected by the
operations and of land upon which
entry may be required for the
purpose of carrying out the
operations and executing
temporary works
Indicates Drawing Location
Indicates Drawing Number
NOTES
50m SCALE 1:2500
checkamendmentsrev date
T +44 (0) 28 90 667914
F  +44 (0) 28 90 668286
W www.rpsgroup.com/ireland
E ireland@rpsgroup.com
Elmwood House
74 Boucher Road
Belfast
BT12 6RZ
Drawing Number
Project Number Sheet Size
Client
Revision
Drawing Scale
Project
Title
Status
Approved By
Drawn By
Checked By Date
South Kinross Flood Protection Scheme
Scheme Key Plan
Flood Protection Operations
IBE1585 A1 As Shown
IBE1585_FO_2000
NM F01 C
AMcG SP 12/03/2024
50m SCALE 1:2500
UPSTREAM WORKS
IN TOWN WORKS
A NM 30/11/2023Draft FRM ActNotification
IBE1585_FO_****
500m SCALE 1:25,000
THIS IS THE PLAN MARKED IBE1585_FO_2000 REFERRED TO IN
THE FLOOD PROTECTION SCHEME FOR SOUTH KINROSS FLOOD
PROTECTION SCHEME 2024
PROPER OFFICER
(Signature)
FOR PERTH AND KINROSS COUNCIL
(date)
B NM 01/02/2024FRM Act Notification Client Comments
C NM 12/03/2024Final FRM Act Notification