Agenda Document Pack - Climate Change and Sustainability Committee - 27/05/2026

Perth and Kinross Council · 27 May 2026
Back to Climate Change and Sustainability Committee — 27 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
20/05/2026 
A hybrid meeting of the Climate Change and Sustainability Committee will be
held in the Council Chamber on Wednesday, 27 May 2026 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Richard Watters (Convener)
Councillor Liz Barrett (Vice-Convener)
Councillor Hugh Anderson
Councillor Andy Chan
Councillor Ken Harvey
Councillor David Illingworth
Councillor Noah Khogali
Councillor Grant Laing
Depute Provost Andrew Parrott
Councillor Grant Stewart
Councillor Jack Welch
Page 1 of 126

Page 2

Page 2 of 126

Page 3

Climate Change and Sustainability Committee 
Wednesday, 27 May 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES 
2 DECLARATIONS OF INTEREST 
3 MINUTE OF MEETING OF THE CLIMATE CHANGE AND
SUSTAINABILITY COMMITTEE OF 18 FEBRUARY 2026 FOR
APPROVAL
(Copy herewith) 
5 - 6 
4 MOBILITY STRATEGY 18 MONTH REVIEW
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 26/144) 
7 - 62 
5 GREEN LIVING FUND - ROUND 3
Report by Strategic Lead - Environment and Infrastructure (Copy
herewith 26/145) 
63 - 74 
6 PERTH SURFACE WATER MANAGEMENT PLAN
Report by Strategic Lead - Environment and Infrastructure (Copy
herewith 26/146) 
75 - 88 
7 BRIDGE OF EARN SURFACE WATER FLOOR STUDY
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 26/147) 
89 - 100 
8 PERTH & KINROSS COUNCIL PROPERTY FLOOD RESILIENCE
GRANT
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 26/148) 
101 - 116 
9 NATURE RESTORATION FUND 2026-2027
Report by Strategic Lead - Environment and Infrastructure (Copy
herewith 26/149) 
117 - 126 
Page 3 of 126

Page 4

Page 4 of 126

Page 5

Climate Change and Sustainability Committee 
Minute of hybrid meeting of the Climate Change and Sustainability Committee held
in the Council Chambers on 18 February 2026 at 1.00pm. 
Present: Councillors R Watters, L Barrett, H Anderson, A Chan, D Illingworth,
K Harvey, N Khogali, G Laing, A Parrott and G Stewart and J Welch. 
In Attendance: F Crofts, Strategic Lead – Environment and Infrastructure; P Leonard,
D Grant, N Simpson (up to and including Item 5), C Leishman (up to and including
Item 5), R Hanna (up to and including Item 5) and A Nettleton (up to and including
Item 5) (all Environment and Infrastructure); A O’Connell, A Clegg (both Housing and
Communities); S Hendry, A Taylor, A Brown and M Pasternak (all Legal and
Governance). 
Councillor R Watters, Convener, Presiding. 
The Convener led on Items 1-5, with Vice-Convener L Barrett on Item 6. 
1. Welcome and Apologies 
Councillor Watters welcomed everyone to the meeting. 
2. Declarations Of Interest 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. Minute of Meeting of Climate Change and Sustainability Committee of
10 November 2025 
The minute of meeting of Climate Change and Sustainability Committee of 10
November 2025 was submitted and approved as correct record. 
4. Outstanding Business Statement 
Resolved:
The status of actions in the Outstanding Business Statement, be noted and
completed actions removed accordingly. 
5. Perth and Kinross Circular Economy Strategy 2026-2031 
There was submitted a report by Strategic Lead – Environment and
Infrastructure (26/45) (1) informing Members of the outcome of the public
consultation on the Council’s draft Circular Economy Strategy, and (2) presenting a
revised, final version of the strategy and associated action plan for approval. 
Resolved:
(i) The Circular Economy Strategy and Action Plan, as detailed in Report 26/45
be approved.
3
Page 5 of 126

Page 6

(ii) The governance arrangements and the intention to provide annual progress
updates to this Committee, be noted. 
6. Tree Planting Policy 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (26/46) setting out the proposal for a Council-wide Tree Planting Policy
which will become part of the Council’s Tree Management Strategy which contains
the approved Tree Management Policy and Ash Dieback Strategy. 
Resolved:
The Tree Planting Policy, as detailed in Appendix A to Report 26/46, which
will be the first formal document covering tree planting throughout Council owned,
managed and maintained land ensuring that existing funding is used efficiently,
following recommended methods and in appropriate locations, be approved. 
~~~~~~~~
Page 6 of 126

Page 7

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Climate Change and Sustainability Committee 
Date of Meeting: 27 May 2026 
Report Title: Mobility Strategy 18 Month Review 
Report Number: 26/144 
Report Author: Matthew Davis, Lead Officer Mobility Strategy & 
Carlyn Morilly, Transportation Development Officer 
Organisational Lead: Serge Merone, Strategic Lead - Economy,
Development & Planning
___________________________________________________________________
1. Purpose 
1.1 The purpose of this report is to update Members on the delivery of the Mobility
Strategy, to present a draft Monitoring and Evaluation Plan and a draft revised
Action Plan for approval, and to request approval to commence engagement
on Mobility Strategy action 2, relating to Perth Transport Futures City Centre. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the updates provided on the delivery of the Mobility Strategy and Action
Plan
2.2 Approves the Mobility Strategy Monitoring and Evaluation Plan (Appendix A)
4
Page 7 of 126

Page 8

2.3 Approves the revised Action Plan (Appendix C) and removal of 41 actions 
2.4 Approves the Perth Transport Futures City Centre Engagement Plan
(Appendix D) and its commencement  
3. Background/Context 
3.1 The Mobility Strategy is Perth & Kinross Council’s (PKC) Local Transport
Strategy which was approved by the Climate Change and Sustainability
Committee on 23 October 2024 and covers the period 2025-2040. 
3.2 A Mobility Strategy was identified in the PKC Corporate Plan (2022-27) as a
key strategy to help deliver two Corporate Plan priorities: tackling climate
change; and delivering a stronger and greener economy. Developing the
strategy also delivered on transport action T1 in the Council’s Climate Change
Strategy and Action Plan (adopted 2021).  
3.3 Taking climate action is a key theme of the Mobility Strategy, along with
reducing inequalities, delivering inclusive economic growth and improving our
health and wellbeing, which are all aligned with the National Transport
Strategy (NTS). The Mobility Strategy’s 11 Transport Planning Objectives
describe the desired outcomes under each of these four themes. The NTS
themes and transport planning objectives are included in Table 1 below. 
Table 1: Transport Planning Objectives and alignment with National Transport
Strategy priorities 
3.4 From the 11 objectives, actions were developed which were assessed as
performing well against the strategy’s objectives, alongside deliverability
considerations and alignment with national transport policy. This forms the
strategic case for the programme of work set out in the Action Plan.
NTS2 Priorities TPO  PKC - Transport Planning Objectives 
Reduces
Inequalities 
1 To improve the affordability of transport options across Perth and Kinross for all 
2 To improve the ability of rural communities and communities with protected characteristics to
access jobs, education and services 
Takes Climate
Action
3
To reduce CO2 emissions produced by transport across Perth and Kinross, by reducing car
kilometres, decarbonising motorised transport and increasing the share of everyday journeys of
people and goods by sustainable and active travel modes   
4 To improve climate resilience across Perth and Kinross's transport network by reducing the
impacts caused by extreme weather events 
Helps Deliver
Inclusive
Economic
Growth
5 To support economic growth by improving the reliability and efficiency of Perth and Kinross's
transport network   
6
To support local development that encourages and facilitates local living and sustainable access,
across Perth and Kinross, by achieving an increased active travel and public transport mode split
to and from new developments 
7 To improve the capacity and reliability of alternative sustainable freight and logistic modes
across Perth and Kinross  
8 To improve labour market access through sustainable transport, active travel, and digital
opportunities, to and from Perth and Kinross  
Improves our
Health and
Wellbeing 
9 To improve road safety and perceived safety for all transport users across Perth and Kinross     
10 To improve physical and mental health within Perth and Kinross through walking, wheeling and
cycling  
11 To improve air quality across Perth & Kinross's road network by achieving revocation of both Air
Quality Management Areas and reducing preventable pollutants 
Page 8 of 126

Page 9

3.5 Since approval of the Mobility Strategy, actions have been assigned to leads
within PKC and the Mobility Strategy Working Group established to co-
ordinate delivery across departments. This work has enabled a Monitoring
and Evaluation Plan to be developed. 
3.6 In the Climate Change Annual Report to Full Council on 25 February 2026, it
was noted that the transport KPIs would be reviewed and amended in the
next 6 months, as part of developing a monitoring framework for the Mobility
Strategy. The Mobility Strategy Climate theme indicators outlined in this report
are proposed to be included as transport KPIs for the Climate Change
Strategy. 
3.7 A key action from the Mobility Strategy relates to delivering the city centre
improvements envisaged under Phase 4 of Perth Transport Futures
Programme. Action 2 states “Make improvements within the Perth City Centre
ring road to reduce car dominance and improve sustainable and active travel
choices. Improvements may consider: parking and road space reallocation,
traffic management arrangements, connecting services, and placemaking to
optimise traffic flows and the space available, and improve sustainable and
active travel choices to reduce congestion and local emissions”. 
3.8 The expected reduction in city centre traffic following the opening of the Cross
Tay Link Road in March 2025, created the opportunity to reallocate road
space to make city centre improvements without significant negative traffic
impacts. 
3.9 A feasibility study commenced in 2024 to test this, entitled “Perth Circulation
Plan”, which models the Perth City centre transport network operation with
reduced provision for cross-city through traffic and enhanced networks for
sustainable and active travel. An all-Member briefing was held on 27 May
2025. 
3.10 The resulting conceptual plan is supported by traffic modelling which shows
that the aspired changes to the city centre are broadly feasible (i.e. can be
made without undue negative impacts on traffic flow).
4. Main Issues 
4.1 In the 18 months since the Mobility Strategy was approved, progress has
been made on delivering a range of actions. Key highlights include: 
• Progression with Perth Transport Futures through the opening of the
Cross Tay Link Road and Destiny Bridge (Phase 2) and completion of a
feasibility study for Perth Transport Futures City Centre (Phase 4). 
The Bertha Park Link Road (Phase 3) is nearing completion and is likely
to open mid to late June 2026.
• The Electric Vehicle Infrastructure Fund (EVIF) Strategy and Action Plan
is complete. Funding for new charge points has been secured, and
installation and maintenance will be transferred to a private operator,
with implementation expected to commence towards the end of 2026/27.
Page 9 of 126

Page 10

• In 2024/25 PKC achieved a 100% delivery rate for level two Bikeability
training in participating Primary Schools.
• PKC has procured Traffic Modelling Software, allowing us to undertake
some traffic modelling work in-house. This will allow us to model, for
example, the impact of proposed LDP sites.
• Significant expansion of 20mph speed limit streets on local and trunk
roads has taken place, in accordance with Transport Scotland’s 20mph
strategy.
• Consultants are developing a new concept design and business case for
the Dunkeld Road Corridor integrating bus priority and active travel,
funded via Transport Scotland’s Bus Infrastructure Fund (BIF).
• Investigative work is on-going into Park & Ride site usage and options
for additional facilities in Perth and Kinross.
• The Council’s Transport Transformation Project is reviewing bus powers
available to PKC under the Transport (Scotland) Act 2019 along with
options for future bus network provision. The Outline Business Case is
due to be presented to Full Council on 2nd September 2026. 
4.2 A Monitoring and Evaluation Plan has been developed containing two
sections:  process and outcome evaluation (Appendix A). The former tracks
delivery of the Action Plan (i.e. the outputs) The latter determines the extent to
which the Mobility Strategy’s 11 objectives are being achieved through a
series of indicators. 
Process Evaluation 
4.3  The Mobility Strategy includes an Action Plan and 167 actions are currently
listed to achieve the Strategy’s Transport Planning Objectives. Monitoring of
the Action Plan is co-ordinated through the Mobility Strategy Working Group
using the Monitoring and Evaluation sheet appended to this report, containing
an update from each action owner (Appendix B).   
4.4 Four actions have been completed to date and work has commenced on 132
actions. The completed actions are: 
• action 28, develop an asset management platform to highlight road
network status;
• action 36, implement and enforce pavement parking ban;
• action 57, free bus travel during the run up to Christmas and on the first
Saturday of the month;
• action 86, safeguard land for Park & Ride development in the local
development plan. 
4.5 Analysis of the Action Plan shows 80% of the actions are under the direct
influence of PKC. The remaining actions are led by regional and national
partners such as Tactran, Network Rail and Transport Scotland. For these
actions PKC plays a supporting and/or influencing role, however they are all
necessary to improve the transport situation across Perth and Kinross.
Page 10 of 126

Page 11

Although 80% of the actions are assigned to PKC as the action owner, an
initial review of the scale of work and associated cost highlights that delivery
is strongly dependent on securing external financial support from Scottish
Government. 
4.6 To support the monitoring and evaluation of the Action Plan, an exercise was
undertaken to sharpen its focus for delivery. This concluded with a
rationalised list which involved merging or consolidating actions containing
duplication or removing those that were not specific enough.  Some actions
have been reworded, particularly where wording has become dated, while
maintaining the strategic intention. 
4.7 Some actions, on review, were deemed to be policy statements rather than
something that could be directly actioned. These were extracted into a list of
policy statements (Appendix E), which will be considered for incorporation into
PKC policies and guidelines, such as Local Development Plan 3 and the
Roads Development Guide. 
4.8 This process has reduced the number of actions from 167 to 126. The
resulting list of Actions has been re-numbered sequentially. Actions
referenced in this report are using the new numbering. The revised Action
Plan is included in Appendix C. 
Outcome Evaluation 
4.9 Transport Planning Objectives were developed, in accordance with Transport
Scotland guidance, which define the changes that PKC are working towards.
Their achievement will be influenced by Mobility Strategy Action Plan delivery
as well as wider societal factors that are out with the control of the Council. 
4.10 Having reviewed the Transport Planning Objectives, indicators have been
developed to provide a meaningful indication of whether, and to what extent,
the Mobility Strategy’s actions are advancing the objectives. The indicators
rely on the availability of reliable and relevant datasets. The Regional
Transport Partnership, Tactran, was consulted to provide expertise on
selecting appropriate indicators and datasets, as well as to advise on where
legitimate data gaps exist. Where data gaps exist, proxy indicators have been
proposed until such time as more relevant data can be sourced or collected.
The rationale for indicator and data selection, remaining data gaps and
proposals to fill them is detailed in Appendix A. 
4.11 A summary of the proposed indicators is set out in Table 2 below. As noted
above, the indicators for Transport Planning Objective 3 will also be included
as Transport KPIs for the Climate Change Strategy. Most of the required
baseline data has been collected. Key areas where data is missing are for
freight volumes moved by sustainable modes of transport and modal share
data for new developments. The data sources used are currently updated
annually or biennially. 
Page 11 of 126

Page 12

Transport Planning Objective Indicator Baseline
1) To improve the affordability of
transport options across Perth
and Kinross for all
Number of residents
registered for The
Scottish National
Entitlement Card (NEC)
31 March 2026
▪ 21,216 (Young
Persons’ Free Bus
Travel Scheme) 
▪ 50,899 (Older &
Disabled Persons’
Free Bus Travel
Scheme).
Adults who used a local
bus service in the past
month, percentage who
agreed 'the fares are
good value'
2024
68% agreed that bus fares
are good value
2) To improve the ability of rural
communities and communities
with protected characteristics to
access jobs, education and
services
% of 16-24 year olds
able to access a range of
employment
opportunities within 40
mins/60 mins by public
transport
2023:
Within 40 minutes: 80.5%
Within 60 minutes: 63.8%
% of 16-24 year olds
able to access further
education facilities within
30 mins/60 mins by
public transport
2023:
Within 30 minutes: 38%
Within 60 minutes: 74.3%
% of population within
rural areas able to
access by public
transport within
30mins/40mins/60mins:
(a) range of employment
opportunities, (b) further
education and (c)
centres with a large food
store and (d) Post Office
2023: 30 mins
Further Education: 15.7%
Food Store: 41%
Post Office: 78.3% 
2023: 40 mins
Employment: 63.9% 
2023: 60 mins 
Employment: 56.6%
Further Education: 61.4%
Food Store: 67.5%
Post Office: 80.7%
3) To reduce CO2 emissions
produced by transport across
Perth and Kinross, by reducing
car kilometres, decarbonising
motorised transport and
increasing the share of
everyday journeys of people
and goods by sustainable and
active travel modes
CO2 emissions from
transport in Perth and
Kinross
2023/24
493.8 kt CO2e 
Mode Share – All
Journey Types 
2024
24% Walking
54% Driver (car/ van) 
16% Passenger (car / van) 
1% Bicycle
5% Bus
1% Rail
Mode Share – Child
Journeys to School 
2025
39% walk
4% cycle
2% scooter/ skate
8% park & stride
24% driven
20% bus
2% taxi
Car kilometres travelled  2024/25
1824 million vehicle
kilometres
Page 12 of 126

Page 13

Percentage of cars and
vans that are electric
2025
2.8%*
Sustainable Freight
Mode Share
Data source under
development
4) To improve climate resilience
across Perth and Kinross’s
transport network by reducing
the impacts caused by extreme
weather events
Number of public road
closures due to flooding
or other climate change
impacts
2023/24
99
Rail services cancelled/
delayed due to adverse
weather
2024 
• Glasgow – Aberdeen
Line: 15 cancelled, 10
part-cancelled, 186
failures
• Glasgow/ Edinburgh –
Perth/ Inverness: 45
cancelled, 10 part-
cancelled, 193 failures
5) To support economic growth
by improving the reliability and
efficiency of Perth and Kinross’s
transport network
Rail journey time
reliability
Annual average Feb 25 –
Feb 26
86.4% of ScotRail services
arrived or terminated at
Perth Station within 5
minutes of their booked
arrival time
Bus journey time
reliability
Data source under
development
Road journey time
reliability and congestion
on key economic road
network corridors
Data source under
development
Bus/rail service
integration
Data source under
development
6) To support local development
that encourages and facilitates
local living and sustainable
access, across Perth and
Kinross, by achieving an
increased active travel and
public transport mode split to
and from new developments
Mode share for selected
new developments.
Data Gap
7) To improve the capacity and
reliability of alternative
sustainable freight and logistic
modes across Perth and
Kinross
Indicator under
development
Data Gap
8) To improve labour market
access through sustainable
transport, active travel, and
digital opportunities, to and from
Perth and Kinross
PKC Broadband
coverage
2025
Superfast availability 91.5%
Gigabit availability 57.6%
Unable to receive decent
broadband 0.7%
% of regional jobs
accessible within 60
minutes by public
transport
2023
59% of regional jobs are
accessible within 60 mins
by public transport for Perth
and Kinross residents.
9) To improve road safety and
perceived safety for all transport
users across Perth and Kinross
• Total number of
people killed or
seriously injured
2024
Total KSI = 96
Child KSI = 7
Page 13 of 126

Page 14

(KSI) on roads in
PKC
• Total number of
children killed or
seriously injured
(KSI) on roads in
PKC
Perceived safety -
walking and wheeling
2024
• 77% of residents think
it’s safe to walk or
wheel in their local area
• 56% of residents think
it’s safe for children to
walk or wheel in their
local area
Perceived safety -
cycling
2024
• 48% of residents think
it’s safe to cycle in their
local area
• 36% of residents think
it’s safe for children to
cycle in their local area,
compared to 34% in
2023.
10) To improve physical; and
mental health within Perth and
Kinross through walking,
wheeling and cycling
Percentage of adult
journeys travelling by
either cycling or walking.
2024
25% journeys by walking or
cycling 
Number of early deaths
and serious long-term
health conditions
prevented annually
2025
The physical activity of
walking prevents 33 early
deaths annually, and
walking and wheeling in the
city prevents 144 serious
long-term health conditions
each year
11) To improve air quality
across Perth and Kinross’s road
network by achieving revocation
of both Air Quality Management
Areas and reducing preventable
pollutants
Number of monitoring
sites where the annual
mean air pollutant levels
exceed national
objectives
2025
No annual mean
exceedances for NO2 (75
sites) or PM10/PM2.5 (4 sites) 
Number of monitoring
sites where annual mean
air pollutant levels are
increasing & decreasing
2025 
For NO2 (75 sites)
Increasing (9), Decreasing
(61), No Change (2), N/A
first year in place (3)  
For PM10 & PM2.5, interim
figures to be adjusted (4
sites)
Increasing(3),
Decreasing(1)
* The national dataset from the Department for Transport is likely to be an underestimate, see
Monitoring and Evaluation Plan for details.
Table 2: Indicators proposed to monitor the Transport Planning Objectives, along
with baseline data 
Page 14 of 126

Page 15

5. Proposals 
Mobility Strategy Reporting 
5.1 Given the 15-year lifespan of the Mobility Strategy it is proposed that a report
is brought back to this Committee every 2 years, detailing progress delivering
the Mobility Strategy and achievement of objectives. Transport will continue to
feed into the climate change annual reporting utilising the new KPIs outlined
in this report. 
5.2 During the next reporting period work will continue with Tactran, seeking to fill
data gaps in the outcome evaluation process, working towards a complete
suite of indicators to monitor the strategy’s objectives. 
Perth Transport Futures City Centre Plan 
5.3 As noted above, a conceptual plan has been developed for Perth Transport
Futures City Centre, which shows that the proposed changes are broadly
feasible. The study area is shown in Figure 1. 
Figure 1: Perth Transport Futures City Centre Study Area 
5.4 However the observed city centre traffic reductions, which this plan makes
use of, will not last indefinitely. This is because in areas of high travel
demand, traffic volumes usually increase over time to fill available road space.
Hence there is a degree of urgency to begin implementing the Perth Transport
Futures City Centre Plan. 
Page 15 of 126

Page 16

5.5 To prepare for this, engagement is now required to refine the conceptual plan
and add in detail to create a deliverable proposal. Approval to commence
engagement with residents, visitors, businesses and other stakeholders over
the next 12 months is recommended by this report and an engagement plan is
included in Appendix D. 
5.6 The purpose of the engagement is to: 
• Inform people what Perth Transport Futures City Centre Plan is and why
it is being proposed
• Consult on the level of support for key principles underpinning the plan
and the trade-offs that will be required to implement it 
5.7 The engagement plan is being developed in line with best practice outlined in
the National Standards for Community Engagement. 
5.8 Proposed engagement methods include an online survey supplemented by
market research to ensure a representative sample, focus groups of seldom
heard and underrepresented groups and stakeholder workshops. 
5.9 There is also the potential to trial measures from the Plan as part of major city
centre projects that come forward over the next few years and monitor their
effectiveness. 
5.10 Perth Transport Futures City Centre project delivery will be planned and co-
ordinated with the wider programme of city centre projects programmed over
the next few years, including the bridges maintenance and associated traffic
management as well as other engagement activities such as around public
transport. 
5.11 Additionally it should be noted that Mobility Strategy action 126 looks to make
similar improvements within town and village centres, so the learning from
Perth will be applied to shaping proposals that will be developed in other
settlements.
6. Conclusion   
6.1 The Mobility Strategy Monitoring and Evaluation Plan will ensure that the
Council is fully informed regarding progress with delivering the Strategy and
will measure the extent to which delivery is achieving the objectives. This is
supported by a revised Action Plan that will be easier to read and contain less
overlaps between actions. 
6.2 Commencing engagement on Mobility Strategy action 2, Perth Transport
Futures City Centre, will allow proposals to be refined by public and
stakeholder feedback. There is a degree of urgency for developing and
trialling measures in the city centre, because traffic reductions following
opening the Cross Tay Link Road are likely to be transient and delays risk
missing the opportunity to take advantage of them.
Page 16 of 126

Page 17

7. Impact Value Assessment 
Mobility Strategy 18 Month Review
8. Appendices 
8.1 Appendix A: Monitoring and Evaluation Plan 
8.2 Appendix B: Action Plan Progress Update 
8.3 Appendix C: Revised Action Plan 
8.4 Appendix D: Perth Transport Futures City Centre Engagement Plan  
8.5 Appendix E: List of Policy Statements 
Page 17 of 126

Page 18

Page 18 of 126

Page 19

Appendix A: Mobility Strategy Monitoring and Evaluation Plan
The Mobility Strategy and evaluation plan consists of two components: process evaluation and
outcome evaluation. Process evaluation will track delivery of the Action Plan by action owners.
Outcome evaluation will focus on monitoring the achievement of the Transport Planning Objectives
(TPOs) in accordance with the agreed indicators and baseline data outlined below. 
Process Evaluation
The Mobility Strategy includes an Action Plan, and 167 actions are currently listed to achieve the
Strategy’s TPOs. Monitoring of the Action Plan is co-ordinated through the Mobility Strategy
Working Group, using the Monitoring and Evaluation sheet appended to the main report, containing
an update from each action owner (see Appendix B).
To support the monitoring and evaluation of the Action Plan, an exercise was undertaken to sharpen
its focus for delivery. This concluded with a rationalised action list following merging or
consolidating actions containing duplication or removing those that were not specific enough. 
Some actions have been reworded, particularly where wording has become dated, while
maintaining the strategic intention. Some actions, on review, were deemed to be policy statements
rather than something that could be directly actioned. These were extracted into a list of policy
statements, which will be considered through development of Local Development Plan 3 and the
Roads Development Guide. This process has reduced the number of actions from 167 to 126. The
revised Action Plan is included in Appendix C of the main report. 
Analysis of the Action Plan shows 80% of the actions are under the direct influence of PKC. The
remaining actions are led by regional and national partners such as Tactran, Network Rail and
Transport Scotland. For these actions, PKC plays a supporting and/or influencing role, however they
are all necessary to improve the transport situation across Perth and Kinross. Although 80% of
actions are assigned to PKC as the lead action owner, a review of the scale and associated cost
highlights the strong dependence of delivery on significant funding from Scottish Government.
It is proposed that the action owners will provide annual updates on their assigned actions which
will be shared with the Climate Change and Sustainability Committee convenors. Through quarterly
meetings of the Mobility Strategy Working Group, action owners and stakeholders will engage on
opportunities for alignment, synergy and partnering.
Outcome Evaluation 
A description of the indicators and data sources identified to monitor each TPO is set out below.
Data gaps have been identified where data is not readily available, and avenues to be explored to
fill these gaps are identified. The intention is for outcome evaluation data to be updated and
reported every two years to the Climate Change and Sustainability Committee.
TPO 1: To improve the affordability of transport options across Perth and Kinross for all
This objective seeks to improve the ability of households to pay for travel without sacrificing
essential needs. Public Health Scotland warns that transport affordability is a key factor that can
place households at risk of transport poverty and public health issues. Transport poverty is an
important aspect of social and economic inclusion and is typically defined as when the cost of
travel is at least 10% of household income. This data is not currently available, and in its absence,
Appendix 1 4
Page 19 of 126

Page 20

we will use alternative data sources from partners who are monitoring travel costs and the impacts
on households and economic hardship. 
Perth and Kinross Council, by funding bus services, is working towards providing an affordable travel
option for households but funding constraints place this work at risk. Budget constraints highlight
the limited role that PKC can play in advancing the affordability objective and points to the need
for support from Scottish Government.
TPO 1: To improve the affordability of transport options across Perth and Kinross for all
Indicator Data Set  Current Baseline
Number of residents
registered for The Scottish
National Entitlement Card
(NEC)
Cardholder data is supplied by
the National Entitlement Card
Programme Office (NECPO)
31 March 2026: 
▪ 21, 216 (Young Persons’
Free Bus Travel
Scheme) 
▪ 50, 899 (Older &
Disabled Persons’ Free
Bus Travel Scheme). 
Adults (16+) who used a local
bus service in the past month,
percentages who agreed with
each statement: 'the fares are
good value'
Scottish Household Survey
Local Authority results: Table
LA14A: Adults (16+) who used a
local bus service in the past
month, percentages who
agreed with each statement 
2024:
▪ 68% agreed that bus
fares are good value in
Perth & Kinross
% of household income spent
on transport
Data gap: no data source
available. We will work with
partners to develop data
sources as part of Transport
Scotland and Public Health
Scotland’s work on transport
poverty. 
Not applicable 
TPO 2: To improve the ability of rural communities and communities with protected
characteristics to access jobs, education and services.
This objective addresses the challenges that rural communities and people with protected
characteristics face to access jobs, education, and essential services. Our intention is thus to
monitor whether rural communities and people with protected characteristics can physically,
affordably, safely, and reliably reach jobs, education, and essential services.  The National Public
Transport Accessibility Tool (NaPTAT) data was made available for the Perth and Kinross area by
Tactran. This dataset, which is also used by Tactran  to monitor the Regional Transport Strategy’s
accessibility indicators, has provided useful data on the proportion of 16 – 24-year-olds able to
access a range of employment opportunities and further education facilities, as well as the
percentage of population in rural areas able to access various services by public transport within
30 minutes.   
Page 20 of 126

Page 21

Currently, a data gap identified is access for people with disabilities. This data is not readily
available and avenues for how this data is best collected will be explored with Tactran and the
Equalities Strategic Forum 
TPO 2: To improve the ability of rural communities and communities with protected
characteristics to access jobs, education and services
Indicator Data Set  Current Baseline
% of 16–24-year-olds able to
access a range of employment
opportunities within 40
mins/60 mins by public
transport 
The National Public Transport
Accessibility Tool (NaPTAT)
2023: 
▪ Within 40
minutes: 80.5% 
▪ Within 60 minutes:
63.8% 
% of 16–24-year-olds able to
access further education
facilities within 40 mins/60
mins by public transport 
The National Public Transport
Accessibility Tool (NaPTAT)
2023: 
▪ Within 40
minutes: 38% 
▪ Within 60 minutes:
74.3% 
% of population within rural
areas able to access by public
transport within
30mins/40mins/60mins: (a)
range of employment
opportunities, (b) further
education and (c) centres with
a large food store and (d) Post
Office
The National Public Transport
Accessibility Tool (NaPTAT)
2023: 30 mins
▪ Further Education:
15.7%
▪ Food Store: 41%
▪ Post Office: 78.3% 
2023: 40 mins
▪ Employment: 63.9% 
2023: 60 mins 
▪ Employment: 56.6%
▪ Further Education:
61.4%
▪ Food Store: 67.5%
▪ Post Office: 80.7% 
Ability of people with
disabilities to access jobs,
education, and services
Data gap: no data source
available. We will work with
partners and the Equalities
Strategic Forum to develop
data sources. 
Not applicable 
TPO 3: To reduce CO2 emissions produced by transport across Perth and Kinross, by reducing
car kilometres, decarbonising motorised transport and increasing the share of everyday
journeys of people and goods by sustainable and active travel modes.
Emissions from transport are one of the leading contributors to climate change and a key objective
of the Strategy is thus to reduce them. Tackling transport emissions is dependent on the transition
from fossil fuel to electric-powered vehicles, a meaningful mode shift from driving to public
transport and active travel, and a shift of freight transport to more sustainable modes. As such, the
Page 21 of 126

Page 22

Mobility Strategy needs to monitor the proportion of vehicles that are electric, mode shares for
freight and everyday journeys, and vehicle miles travelled. Further, overall emissions from transport
will be monitored.
Reducing vehicle miles travelled includes reducing the amount of freight transported by road. Mode
share for freight is however identified as a data gap at this stage, and we will work with Tactran’s
Regional Freight Quality Partnership to explore this objective and the associated indicator further.
TPO 3: To reduce CO2 emissions produced by transport across Perth and Kinross, by
reducing car kilometres, decarbonising motorised transport and increasing the share of
everyday journeys of people and goods by sustainable and active travel modes
Indicator Data Set  Current Baseline
CO2 emissions from transport
in Perth and Kinross
UK local authority and regional
greenhouse gas emissions
statistics: 2005 to 2023: Table
2.1: Local authority territorial
carbon dioxide (CO2)
emissions estimates within
the scope of influence of local
authorities 2005-2023 (kt
CO2e) - Subset dataset
(Excludes large industrial sites,
railways, motorways, land-use,
livestock and soils)
Transport Total 2023: 
391.9 kt CO2e down from 398.4
kt CO2e in 2022. This figure
includes 306.4 on A-Roads
and 79.9 on minor roads.
Mode Share - Main Mode of
Travel
Scottish Household Survey:
Transport and Travel in
Scotland: Table LA16: SHS
Travel Diary - Main mode of
travel (percentages) in Perth
and Kinross: 2024
Main Mode of Travel: Perth and
Kinross (2024) 
24% Walking
54% Driver (car/ van) 
16% Passenger (car / van) 
1% Bicycle
5% Bus
1% Rail
Mode Share - Journeys to
School
Hands up Scotland Survey
(HUSS), 2025. 
HUSS 2025 for Perth and
Kinross:
39% walk
4% cycle
2% scooter/ skate
8% park & stride
24% driven
20% bus
2% taxi
Freight vehicle kilometres
travelled (VKT) travelled by
road
DfT Road Traffic Statistics 
TACTRAN
2022
Light Commercial & Heavy
Goods Vehicle: 436 million
miles travelled
Percentage of cars and vans
registered in Perth & Kinross
that are electric 
DfT Vehicle licensing statistics September 2025
2.8%
Car Kilometres Travelled in
Perth and Kinross
DfT Road Traffic Statistics 
TACTRAN
Climate KPI data
1824 million vehicle km
travelled on roads in Perth &
Kinross in 2024.
Mode share (Freight)  Data Gap We are working with Tactran’s
Regional Freight Quality
Page 22 of 126

Page 23

Partnership to develop
meaningful indicators. 
TPO4: To improve climate resilience across Perth and Kinross’s transport network by reducing
the impacts caused by extreme weather events
This objective seeks to improve the way in which the transport network responds to adverse
weather events and the associated actions relate to reducing the need for road and bridge closures,
reducing the number of delayed and cancelled services, proactively assessing the transport
network for climate risk and implementing resilience interventions. 
As part of the PKC Climate Change Strategy and Action Plan, the number of road closures due to
weather events is being monitored, and data sources to monitor climate risk for PKC assets will
largely be developed in-house through formal recording and reporting processes. Rail service
delays will be monitored using Network Rail’s reports on delays and cancellations due to adverse
weather. This data is sourced via Tactran.
TPO4: To improve climate resilience across Perth and Kinross’s transport network by
reducing the impacts caused by extreme weather events
Indicator Data Set  Current Baseline
Number of public road
closures due to flooding or
other climate change impacts
Internal (RMP) - Climate
Change Resilience indicator
99 in 2023/24
Indicator under development
relating to PKC assets
assessed for climate risk
(proactively) 
Data source under
development in consultation
with the Roads Authority
(Structures). 
Not applicable
Number of rail services
cancelled/ delayed due to
adverse weather
Network Rail performance
data sourced via Tactran 
2024
▪ Glasgow – Aberdeen
Line: 15 cancelled, 10
part-cancelled, 186
failures
▪ Glasgow/ Edinburgh –
Perth/ Inverness: 45
cancelled, 10 part-
cancelled, 193 failures 
TPO 5: To support economic growth by improving the reliability and efficiency of Perth and
Kinross’s transport network.
Reliable journey times are a key component of economic efficiency, and this objective will be
monitored by measuring bus, rail, and general road network journey time reliability. Ideally,
indicators would monitor deviations from scheduled arrival and departure times for public
transport, and congestion, queuing and delays on the road network. 
Bus journey time reliability is a data gap at this stage, and the PKC Public Transport Unit (PTU) is
working to secure comprehensive data from operators, which is a requirement of our supported
service contracts. For rail services, Scotrail’s annual on-time arrival at destination figures will be
utilised. Scotrail’s Public Performance Measure (PPM) is the standard measure for train service
Page 23 of 126

Page 24

performance throughout the UK and includes two elements – punctuality and reliability. Current
figures suggest that the percentage of ScotRail services that arrive or terminate at Perth within 5
minutes of their booked arrival time is 86.3%, compared with Glasgow Queen Street (89.1%) and
Edinburgh (88.7%).
To monitor journey time reliability by road, PKC is currently in the process of procuring a TomTom
licence to be in a position to monitor free-flow and congestion conditions, and to highlight key
hotspots for interventions to improve traffic flow.
TPO 5: To support economic growth by improving the reliability and efficiency of Perth and
Kinross’s transport network
Indicator Data Set  Current Baseline
Bus journey time reliability Data source under
development.  Bus journey
time reliability is a data gap at
this stage, and the Public
Transport Unit (PTU) is working
to secure comprehensive data
from operators.
Not applicable.
Rail journey time reliability Scotrail annual on-time arrival
at destination - available for
Perth
2026
Perth - The percentage of
ScotRail services that arrive or
terminate at this location
within 5 minutes of their
booked arrival time - 86.4%
Road journey time reliability
and congestion on key
economic road network
corridors – indicator under
development.
After procuring a TomTom
licence, we will be in a position
to develop a suitable indicator
and dataset. 
Not applicable
Indicator under development:
bus and rail service
integration.
Data source under
development.
Not applicable 
TPO 6: To support local development that encourages and facilitates local living and
sustainable access, across Perth and Kinross, by achieving an increased active travel and
public transport mode split to and from new developments.
National Planning Framework 4, policy 13 (f) specifies that development proposals for significant
travel generating uses, or smaller-scale developments where it is important to monitor travel
patterns resulting from the development, will only be supported if they are accompanied by a Travel
Plan with supporting planning conditions/obligations. Travel plans should set out clear
arrangements for delivering against transport mode share targets, as well as monitoring and
evaluation, which would produce mode share data.
At present, this is a data gap and the requirement for monitoring of travel plans requires
strengthening and this will be addressed through the LDP3 and internal development management
processes. 
Page 24 of 126

Page 25

TPO 6: To support local development that encourages and facilitates local living and
sustainable access, across Perth and Kinross, by achieving an increased active travel and
public transport mode split to and from new developments
Indicator Data Set  Current Baseline
Mode share for selected new
developments.
Data Gap Not applicable 
TPO 7: To improve the capacity and reliability of alternative sustainable freight and logistic
modes across Perth and Kinross
To encourage sustainable movement of freight, the Mobility Strategy seeks to enhance the capacity
of vehicles and logistics centres – fundamentally impacting on the efficiency and cost of
sustainable freight movements. While this is not directly under the influence of PKC, we will seek to
partner with stakeholders to enable a meaningful mode shift. The indicator for this objective is
currently under development, and the intention is to explore data sources related to sustainable
freight capacity, e.g., EV vans, cargo bikes, consolidation centres, and zero-emission last mile
solutions. There is very limited data on freight publicly available, and we intend to progress
developing the indicator and data sources through Tactran’s Regional Freight Quality Partnership
which will resume later this financial year.
TPO 7: To improve the capacity and reliability of alternative sustainable freight and logistic
modes across Perth and Kinross
Indicator Data Set  Current Baseline
Indicator under development. No appropriate data source
has been identified; therefore,
no indicator has been
developed. We are engaging
with partners on the
development of indicators for
the local area and the region. 
Not applicable 
TPO 8: To improve labour market access through sustainable transport, active travel, and
digital opportunities, to and from Perth and Kinross.
The Mobility Strategy seeks to connect employers with the labour market through sustainable
means by ensuring that the necessary public transport, active travel, and digital connectivity
opportunities are available. The objective relates to both supporting employers within the Perth
and Kinross area to secure the necessary labour and also supporting employers outwith Perth and
Kinross to secure labour from the PKC area.
We will seek to undertake spatial and transport accessibility analysis of key employment centres
with the location of employees and job seekers. The indicator for this is currently under
development due to the complexity of the modelling required. However, a proxy has been identified
from the National Public Transport Accessibility Tool (NaPTAT) made available by Tactran. This data
assesses the percentage of regional jobs accessible within 60 minutes by public transport for Perth
and Kinross residents. 
Page 25 of 126

Page 26

Digital connectivity is recognised as a highly impactful way to reduce non-discretionary travel
where there are suitable digital opportunities available. Digital opportunities for work, retail, and
accessing services requires that the necessary digital infrastructure is in place and accessible to
businesses, households, and service providers. The Strategy proposes to monitor internet speeds
and coverage in the region using UK Parliament constituency statistics for broadband coverage and
speeds.
TPO 8: To improve labour market access through sustainable transport, active travel, and
digital opportunities, to and from Perth and Kinross
Indicator Data Set  Current Baseline
Availability of broadband
coverage.
PKC-wide data from Ofcom  2025:
▪ Superfast availability
91.5%
▪ Gigabit availability
57.6%
▪ Unable to receive
decent broadband
0.7% 
% of regional jobs accessible
within 60 minutes by public
transport
The National Public Transport
Accessibility Tool (NaPTAT)
2023:
59% of regional jobs are
accessible within 60 mins by
public transport 
TPO 9: To improve road safety and perceived safety for all transport users across Perth and
Kinross.
Scotland’s ambition is to have zero fatalities and serious injuries on Scotland's roads by 2050, and
the Mobility Strategy seeks to promote a safer transport network in Perth and Kinross. By
implementing measures such as reducing speeds to 20mph in residential areas and implementing
safe road design, we can improve road safety outcomes in Perth and Kinross.   
Transport Scotland data will be utilised to monitor killed and seriously injured (KSI) road safety data
for Perth and Kinross. Further, the Walk, Wheel, Cycle Trust (formerly Sustrans) has recently
produced the results of the Walking and Cycling Index for Perth (2025). This is a biennial publication
that uses a representative sample to determine perceptions of safety, and this will be used as a
key Mobility Strategy indicator.
TPO 9: To improve road safety and perceived safety for all transport users across Perth and
Kinross
Indicator Data Set  Current Baseline
▪ Total number of
people killed or
seriously injured (KSI)
on roads in PKC 
▪ Total number of
children killed or
seriously injured (KSI)
on roads in PKC
Transport Scotland road
safety data for Perth and
Kinross (Local authority code
819, S12000024) 
2024 
▪ Total KSI = 96 
▪ Child KSI = 7 
Page 26 of 126

Page 27

Perceived safety - Proportion
of residents who think walking
and wheeling safety is good
Walking & Cycling Index
(Perth)
2024: 77% of residents think
it’s safe to walk or wheel in
their local area, compared to
67% in 2023. 
2024: 56% of residents think
it’s safe for children to walk or
wheel in their local area,
compared to 52% in 2023.
Perceived safety - Proportion
of residents who think cycling
safety is good
Walking & Cycling Index
(Perth)
2024: 48% of residents think
it’s safe to cycle in their local
area, compared to 40% in
2023. 
2024: 36% of residents think
it’s safe for children to cycle in
their local area, compared to
34% in 2023. 
TPO 10: To improve physical and mental health within Perth and Kinross through walking,
wheeling and cycling.
Active travel is strongly associated with improvements in physical and mental health. The Mobility
Strategy thus seeks to encourage improved levels of active travel, recognising the role that active
travel plays in public health outcomes. Given that there is established evidence for the benefits of
walking and cycling for health, the proposed indicator is the share of journeys made by active travel
using data from the Scottish Household Survey. The indicator has been proposed in consultation
with NHS Tayside, Tactran, and Public Health Scotland.
According to the 2025 Walking and Cycling Index for Perth, the physical activity of walking prevents
33 early deaths annually, and walking and wheeling in the city prevents 144 serious long-term health
conditions each year. 
TPO 10: To improve physical; and mental health within Perth and Kinross through walking,
wheeling and cycling
Indicator Data Set  Current Baseline
Percentage of adult journeys
travelling by either cycling or
walking. 
Scottish Household Survey. 2024:
25% journeys by walking or
cycling.
Number of early deaths and
serious long-term health
conditions prevented annually
Walking & Cycling Index
(Perth)
2025
The physical activity of
walking in Perth prevents 33
early deaths annually, and
walking and wheeling in the
city prevents 144 serious long-
term health conditions each
year 
Page 27 of 126

Page 28

TPO 11: To improve air quality across Perth and Kinross’s road network by achieving revocation
of both Air Quality Management Areas and reducing preventable pollutants
Air pollution remains the single largest environmental health risk in the United Kingdom, with
emissions from transport being a key contributor. While there has been a generally consistent
downward trend in both nitrogen dioxide (NO2) and Particulate Matter (PM10 and PM2.5) within the
Perth AQMA since 2009, the most recent air quality modelling of Perth still identifies pollutant
hotspots with borderline objective compliance. For example, while there has not been an
exceedance of the NO2 objective in Perth since 2018, levels are still high in hotspots, with Atholl
Street recording the second highest NO2 levels in Scotland in 2023.
To monitor this objective, indicators will include the number of monitoring sites with exceedance
of the annual mean, as well as the number of monitoring sites where the annual mean is increasing
and decreasing. There are 75 monitoring sites providing good coverage of the PKC road network, 71
are diffusion tubes which only monitor NO2, 4 in Perth are Real Time Monitors which continuously
record data for NO2, PM10 and PM2.5. Data sources have been developed in partnership with PKC
Environmental Health. It should also be noted that following the procurement of Paramics traffic
modelling software, PKC is in an improved position to monitor emissions from transport. 
TPO 11: To improve air quality across Perth and Kinross’s road network by achieving
revocation of both Air Quality Management Areas and reducing preventable pollutants
Indicator Data Set  Current Baseline
Number of monitoring sites
where the annual mean air
pollutant levels exceed
national objectives
Council Annual Air Quality
Monitoring.
2025 
No annual mean exceedances for
NO2 (75 sites) or PM10/PM2.5 (4
sites) 
Number of monitoring sites
where annual mean air
pollutant levels are
increasing & decreasing
Council Annual Air Quality
Monitoring.
2025 
For NO2 (75 sites) 
Increasing (9), Decreasing (61), No
Change (2), Not applicable, first
year in place (3) 
  
For PM10 & PM2.5, interim figures to
be adjusted (4 sites) 
Increasing (3), Decreasing (1) 
Page 28 of 126

Page 29

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
1 Continue the roll-out of the Perth People Place Programme to
develop sustainable and active travel corridors with local
communities - piloted by the Dunkeld Road Corridor.
Corridors to be considered:
Glasgow Road
Dundee Road
Edinburgh Road
Perth Road (Scone to  Perth)
Medium P Dunkeld Road - consultants are working on concept design and business case, funded via
TS Bus Infrastructure Fund (BIF). Initial design work also underway for Glasgow Road
1
2 Make improvements within Perth City Centre to reduce car
dominance and improve sustainable and active travel
choices. Improvements may consider: parking and road
space reallocation, traffic management arrangements,
connecting services, and placemaking to optimise traffic
flows and the space available, and improve sustainable and
active travel choices to reduce congestion and local
emissions.
Short P Completion of a feasibility study for Perth Transport Futures City Centre shows the
aspirational city centre improvements are broadly feasible. An engagement plan is being
presentated at CC&S Committee in May 2026, with the recommendation to commence a 12-
month engagement process.
2
3 Design and deliver a 'City Centre Mobility Hub' to provide an
integrated transport hub in Perth City.
Medium P We are now looking to Integrate the Perth Bus Station & Active Travel Hub within a single,
Council controlled footprint within the new propsoed 'Perth Bus Station' which brings
several financial, operational, and strategic advantages in delivering this from a combined
'Bus Station and Mobility Hub'
3
4 Develop and deliver a 'Strategic Mobility Hub' at Walnut
Grove, to provide local and strategic transport links with
integrated transport choices.
Short P A study is scheduled for 26/27 to explore the viability and need for additional park-and-ride
sites in Perth and Kinross
4
5 Develop and deliver a  'Strategic Mobility Hub' at Bertha Park,
to provide local and strategic transport links with integrated
transport choices.
Short P Land is safeguarded  in the Local Development Plan at Bertha Park for a Park & Ride. A
study is scheduled for 26/27 to explore the viability and need for additional park-and-ride
sites in Perth and Kinross such as at Bertha Park.
5
6 Continue to enhance and integrate all modes of transport at
the existing Broxden Park and Ride site to improve
sustainable and active travel choices.
Short P £300k junction improvements are also scheduled during FY2026-27. Funding request made
to Tactran to support the site redesign to improve accessibility, parking etc through BIF Tier
2 funding of £1.3m.
Initial design work is underway for Glasgow Rd active travel improvements which is also
looking to improve active travel access to Broxden Park & Ride.
Merge 6, 7 & 185. All relate to improvements at
existing Park & Ride sites
6 Explore the feasibility of expanding the extent and
capacity of existing park and ride sites, and integrate all
modes of transport at the locations to improve
sustainable and active travel choices
7 Explore the feasibility of expanding the extent and capacity of
existing park and ride sites, such as Kinross, and integrate all
modes of transport at the locations to improve sustainable
and active travel choices.
Short P Surveys have been undertaken at the Broxden and Kinross park-and-ride facilities to provide
insights into travel behaviour and to explore the viability and need to make changes to these
sites.
Design work underway for Kinross Park & Ride to Kinross High St active travel route
improvements
Merge 6, 7 & 185. All relate to improvements at
existing Park & Ride sites
6 Explore the feasibility of expanding the extent and
capacity of existing park and ride sites, and integrate all
modes of transport at the locations to improve
sustainable and active travel choices
8 Explore options for local Mobility Hubs within rural
communities to integrate modes across rural
neighbourhoods and improve public transport links,
identifying arterial bus routes, optimise the council bus
subsidy budget and working in partnership with community
transport providers.
Medium N 7
10 Support partners with the development of the Perth Railway
Masterplan, encourage the integration of the bus station and
other sustainable and active travel modes.
Short P The OBC for Perth Bus and Rail 'Interchange' (with the inclusion of the Mobility Hub) is
currently in progress. It is antipcated that it will be presented to the Futures Team in April
and subsequently to TCDB. It is planned that PKC should start moving to procurement of
the Design Stage for proposals this summer.
8
Appendix B 4
Page 29 of 126

Page 30

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
11 Update the existing Active Travel Strategy that works for
everyone in line with Transport Scotland's Active Travel
Strategy Guidance (February 2023).
This will adopt and combine the vision and objectives of the
Mobility Strategy, Tactran's emerging regional active travel
network, and the Perth Cycle Network Masterplan to
complement the radial sustainable corridors to and from
Perth City. Support also, the development of local
masterplans to present local aspirations, such as Kinross
Active Travel Masterplan.
Short P Work has commenced and the Active Travel Strategy which will be developed over the next
12 months
9
12 Continue to improve on- and off-street public and residential
cycle parking across village, town and city centres. Ensure
that cycle parking is secure and if feasible, covered. Secure
cycle parking should accommodate various cycles, such as
cargobikes, tricycles, wide-tyred cycles, cycles with trailers
in addition to providing facilities for storing accessories, such
as saddlebags and helmets during the duration of parking to
encourage linked trips by active modes.
Short P Continuing to work with community groups throughout P&K to install new and improve
existing cycle parking.
10
13 Explore universal speed limit reductions, 20mph across all
residential streets along with further speed reductions.
Short P 80% complete across the council area. Perth City complete. Waiting on Transport Scotland
for additional funding to complete works
11
14 Assess and review Core Path Plan path assets and deliver a
programme of improvements.
Long P A review of the CPP would be useful but resource intensive so capacity in CGS and Legal
Services would be required to undertake it. 
CGS work in partnership with PKCT on a number of projects for example Crieff to Comrie
and Stanley to Luncarty Core Paths.  Some projects are underway and the Oakbank to
MacRosty Park all-abilities path in Crieff opened in April 2026. Funding is sporadic from
Transport Scotland and WWCT and there is no PKC funding currently to develop any
programmes but should be considered.
12
17 Work alongside partners TACTRAN to design and develop, or
improve the regional active travel network to connect Perth
and Kinross with other regions, cities and major gateways
using high quality active travel infrastructure that segregates
users form busy roads and makes use of quiet roads where
appropriate.
Long P Continuing to work with Tactran throughout various projects we are developing. 13
18 Support partners in the delivery of National Cycle Network
enhancements to ensure they work for everyone.
Medium P Working in partnership with WWCT on two major projects which will make significant
improvements to the NCN. Tay Street and Scone to Perth.
14
19 Conduct audits of bus stop and bus interchange accessibility
and security, and support partners to deliver a programme of
improvements to enable increased use and modal shift.
Medium P Transport Scotland Bus Infrastructure Fund (BIF) funding is being used to deliver
improvements. Where identified, and as available funding allows, the Public Transport Unit
will continue to work with partners to deliver measures to improve bus stop and bus
interchange accessibility and security.
15
21 Explore options to align rural public transport services with
rail services (timetabling).
Short P Transport Transformation Project will include full review of P&K public transport network so
this will be included in that work
Merge 21, 80 & 182. All relate to aspects to consider
in future provision of bus services
16 Encourage the development of a bus network that is fit
for purpose by investigating options to expand service
levels to fill unmet demand including:
- direct, frequent services on strategic routes
- appropriate scheduled and DRT feeder services
- sufficient off-peak services
- aligning rural public transport services with rail services.
Page 30 of 126

Page 31

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
22 Explore options to improve sustainable transport and active
travel connections to bus and railway stations across Perth
and Kinross.
Medium P Traffic & Network are developing concept designs for active travel improvements along
Marshall Place, Perth connecting to the bus and rail stations. There have also been recent
upgrades at Dunkeld and Birnam station including a new step‑free route linking the station
with Birnam Glen, as well as upgrades to the surrounding footpath network and lighting.
17
24 Support partners to improve the accessibility of rail services
and step-free stations.
Medium P Network Rail have raised both platforms at Dunkeld and Birnam station to improve safety
and accessibility for passengers. Also a new step‑free route linking the rear of platform 2
with Birnam Glen to improve accessibility between the station and Birnam.
Merge 24, 232 & 233.All relate to improving the
accessibility of railway station and services.
18 Support partners to conduct audits of rail interchange
accessibility and security and to deliver a programme of
improvements to improve accessibility of railway
stations and services.
25 Support Transport Scotland and partners in the
decarbonisation of Scotland's passenger rail services by
2035.
Long P T&D plays a supporting role for any work initiated by Transport Scotland and Network Rail in
terms of their work to decarbonise passenger rail services. The design and construction of
the Destiny Bridge over the River Tay accounted for this and it was built that way in order to
accommodate future electrification of the rail line underneath. PKC liaising with NR on
bridge impacts of Aberdeen rail line electrification
19
26 Conduct audits of bus stop ancillary infrastructure. Deliver
improvements on the basis of findings to encourage increase
in use. Improvements may include bus shelters, seating,
cycle parking, and enhancements to legibility, such as digital
display boards with real time information and signage and
wayfinding.
Medium P Transport Scotland Bus Infrastructure Fund (BIF) funding is being used to deliver bus stop
infrastructure improvements including bus shelters & Real Time Passenger Infromation
(RTPI) displays. Where identified, and as available funding allows, the Public Transport Unit
will continue to work with partners to deliver measures to improve bus stop infrastructure
to encourage increased passenger use.
20
27 Finalise and deliver an EV Infrastructure Strategy that will
include on and off-street charging infrastructure and develop
a private/public partnership for delivery and operation.
Medium P Electric Vehicle Infrastructure Fund (EVIF) Strategy & Action Plan complete. Funding for
new charge points secured and preparing to transfer installation and maintenance to a
private operator. Invitation to tender has been published, evaluations will take place
June/July and contractor to be appointed Aug/Sept with a transition from Chargeplace
Scotland by December 2026.
21
28 Develop an asset management platform (e.g. a mapping
tool), used to highlight the status of the road network,
allowing for a clear and prioritised programme of work that
can be well communicated and easily shared. This will help
find coworking opportunities, optimise them, and minimise
disturbance to existing live network.
Short C Road Maintenance Projects are added to a Google map annually. This is used for internal
staff and is available to elected members. A Pin is dropped on the google map to highlight
the area of proposed works, when  setting cursor over pin you can open up a table which
provides details of work type, programmed date and value.  Works are also recorded on the
National Database "Scottish Road Works Register". These recordings are entered on the
database prior to work commencing, allowing other road works organisations to coordinate
works where possible (and also to advise of any special engineering considerations that our
staff should take into consideration when other organisation's aparatus may be impacted
by our works).
22
31 Encourage sustainable procurement options for large
maintenance contracts.
Short P The Climate Change and Sustainable Development Team have been working with the
Council’s Procurement Team to implement sustainable procurement actions throughout
2025/26. An initial engagement with teams that procure large contracts has taken place and
an approach to include sustainable procurement requirements in tender specifications is
currently being developed as a pilot. A plan to engage with Tier 1 suppliers is also in place
and is due to commence in summer 2026. This will help inform sustainable procurement
practices by mapping out existing mechanisms that occur amongst the Council’s suppliers.
A sustainable procurement training session for Council staff that are often involved in
procurement has also been scheduled for May 2026.
23
32 Together with partners, continue to inspect, maintain and
improve road structures across Perth and Kinross to retain
climate resilient networks.
Short P As part of the Council’s Climate Change Action Plan, the Structures Team is inspecting
potential landslip sites to identify any required follow‑up actions. Several high‑priority
inspections have already been completed, and the remaining work will continue over time
alongside other demands on the team’s asset management responsibilities.
24
Page 31 of 126

Page 32

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
33 Together with partners, continue to develop and deliver Flood
Protection Schemes (FPS) under the Flood Risk Management
Strategy - Tay Local Plan District to reduce flood risk across
the identified vulnerable areas. Ensure to consider transport
network resilience and accessibility issues as well as
dwelling flooding.
Short P Perth & Kinross Council continues to progress major Flood Protection Schemes under the
Tay Local Plan District, including advancing the Craigie Burn scheme and delivering the
Comrie Flood Protection Scheme moving towards construction completion at the end of
2026. Alongside these capital works, the Council is also delivering the full suite of statutory
actions set out under the Flood Risk Management (Scotland) Act 2009 and the Local Flood
Risk Management Plans - these include undertaking flood studies, preparing and updating
surface water management plans, and coordinating multi‑agency actions across 14
identified potentially vulnerable areas to reduce overall flood risk.
These statutory actions also encompass responsibilities such as identifying and reviewing
potentially vulnerable areas, maintaining and using updated flood hazard and flood risk
maps, and integrating SEPA’s technical advice into planning and decision‑making - all of
which work collectively to protect communities, strengthen transport network resilience,
and reduce the likelihood and consequences of dwelling flooding across the Tay Local Plan
District.
25
35 Develop a Strategic Parking Policy to align with the Mobility
Strategy's vision and objectives that will assess utilisation,
integration, parking provision, demand, safety and
sustainable transport alternatives. The high-level strategic
framework will enable strategic, tactical and operational
decisions on parking arrangements to be undertaken using an
evidence-based decision-making process. The Parking Policy
may include, for instance, guidance on cycle parking
requirements and appropriate storage types, and reduction
in car parking requirements for new developments.
Short N 26
36 Implement and enforce pavement parking in line with the
Transport (Scotland) Act 2019.
Short C Full enforcement began 6 January 2025 following a period of two months issuing warning
notices.  Compliance with pavement parking is higher than contraventions associated with
RTA91.  67% of PCNs issued for pavement parking during 25-26 have been paid.
27
37 Encourage, promote and facilitate the roll out of digital
infrastructure, such as fast broadband/5G across PKC and
particularly in rural areas and those on low incomes in line
with PKC Digital Strategy.
Medium P The Council will operate a proactive and encouraging approach to mobile connectivity
whilst ensuring that health, landscape and environmental considerations are all properly
considered in the planning process. Telecoms policy statement is now in place.  This marks
an approach to telecommunications for the Council that is positive and proactive in
encouraging better digital connectivity in Perth & Kinross whilst still being mindful of
concerns over the siting of telecommunications equipment for environment and health
reasons.  Overall, the Council recognises the benefits that enhanced connectivity will bring
to residents and businesses in the area to improve quality of life, deliver better services,
promote economic prosperity, and avoid digital exclusion especially in our rural
communities. 
28
38 Support partners to assess options on last mile freight
delivery and the sustainable movement of goods and
encourage the inclusion of resting and welfare facilities for
haulers within the options.
Short N Merge 38 & 123. Both relate to last mile deliveries /
cargo bikes. Separate out a separate action on
welfare facilities
29 &
30
1) Support partners and the business sector to assess
options and implement measures to embed the
sustainable last-mile movement of goods within
corporate culture, encouraging the use of cargobikes as
the preferred choice for local deliveries.
2)Encourage the development of resting and welfare
facilities for haulers
Page 32 of 126

Page 33

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
39 Support trialling and the adoption of innovative technologies
and techniques in line with Mobility Strategy objectives,
improving digital accessibility and thus promoting and
delivering investment in public and private sector services.
Short P PKC have a single Point of Contact working to support R100 and project Gygabyte acting as
a telecoms unit to support digital infrastructure investment. Through market engagement
with private providers and government interventions such as the SBVS Superfast broadband
Voucher Scheme and the GBVS Gigabit Voucher Scheme, we have supported the
deployment of connectivity in the region. We have also supported fibre community
partnerships across communities to deploy further connectivity networks. PKC also
supported the regional Broadband Engagement project in 2024-2025 to deliver, promote
and improve access to digital via UK UKSPF project.
31
40 Lobby for central government ring fenced funding to improve
Local Bus Services and to protect lifeline services.
Short P Consistently lobby for this and provide case studies to SG to support why this is so crucial.
MR will progress this via ATCO Scotland role, point to examples of revenue funding in
England and Wales.
32
41 Work with bus partners to improve safety on public transport.
This may include enhanced provision of lighting and CCTV on
vehicles and at key interchanges and along corridors to
increase perception of safety and encourage modal shift.
Medium P Progress this through the Tayside Bus Alliance, the PKC Anti-Social Behaviour Working
Group and with Community Safety colleagues.
33
42 Explore new bus powers (Transport Act 2019) to meet the
needs of residents and visitors for bus services across the
council area. The interventions may include council-run bus
services, franchised bus services or the council entering into
Bus Services Improvement Partnerships (BSIPs) with bus
operators in the area. Engage with residents and visitors to
better understand where intervention is needed most.
Short P Transport Transformation Project Outline Business Case (OBC) will focus on this. OBC is
due to be presented to Full Council on 02 Sept 2026
34
43 Encourage, support and promote Community Bus
Partnerships and Transport Services across Perth and Kinross
to provide a secure and direct transport option for older
people and those with reduced mobility or disability. Services
may include dial-a-bus services, Community Bike Hubs,
community minibuses and existing schemes, such as the
Glenfarg Community Transport Group.
Short P Progressing this via the Community Transport Forum and direct engagement between
Public Transport Unit and Communities.  Established a Public Transport Forum in March
2026  which will also input.
Merge 43 & 180. Both relate to Community Transport.
Added reference to community car schemes
35 Encourage, support and promote Community Bus
Partnerships (including the supply of bus drivers) and
transport services across Perth and Kinross to provide
additional options. Services may include dial-a-bus
services, Community Bike Hubs, community minibuses
and existing schemes, such as community car schemes
& the Glenfarg Community Transport Group.
44 Improve access to bikes for everyone by exploring an e-bike
share scheme by public or private operators, or by providing
support to community action groups.
Short P The 25/26 Green Living Fund provided funding to Draft & Flow Community Cycle Workshop
to expand their fleet of e-bikes for community use in and around Aberfeldy
36
45 Support and encourage partners and communities to
establish Car Clubs.
Short N 37
46 Support taxi and private hire fleets to decarbonise and move
towards a low carbon fleet.
Long P In the most recent consultation regarding the results of the Unmet Demand Survey for taxi
operators in Perth City, we included an option for electric vehicles to be a consideration. At
the resulting Licensing Committee meeting given the outcome of that consultation it was
shared that electrification of the taxi fleet will be considered in totality alongside PHV when
conditions attached to (and broader Taxi/PHV criteria) are revisited.
38
47 Continue to enforce anti-idling. Short P All officers trained and continue to engage and enforce anti-idling legislation. Delete, delivered as business as usual -
Page 33 of 126

Page 34

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
48 Continually assess air quality across Perth and Kinross to
assess any necessary mitigation measures, such as Low
Emission Zones.
Short P Following continued improvements in air quality for several years, the Crieff Air Quality
Management Area was revoked in December 2024. The updated Perth Air Quality Action
Plan was adopted in August 2025 with a new suite of air quality improvement measures
aligned with Mobility Strategy objectives, and will drive air quality improvement within Perth
City for the next 5-year period. The opening of the Cross Tay Link Road in March 2025 is
expected to lead to a noticeable improvement in Perth’s air quality and work is currently
underway to assess its initial impact.
39
49 Build developments where all essentials (shops, schools,
parks) are close by and easily accessible by sustainable
modes of transport to reduce the need to travel and minimise
the use of unsustainable modes. Interventions will be
assessed through the development management process
and need to be proportionate to the size and location of the
development.
Medium P This is covered by National Planning Framework 4, Policy 13 (b,d). LDP3 needs to take
account of national policy and as such will not include a specific policy on this.
Moved to list of policy statements POL1
50 For developments creating significant number of new trips
with no public transport services available, enforce that the
developer provides a subsidised service until passenger
numbers become commercially viable.
Short P This is covered by National Planning Framework 4, Policy 13 (bii) and PAN75 walking
distances to public transport stops (400m to bus stops). LDP3 needs to take account of
national policy and as such will not include a specific policy on this.
Moved to list of policy statements POL2
52 Continue to encourage and promote the Council's car pool
scheme as well as optimise the service's convenience.
Short P Since Oct 2024 we have increased our pool vehicle numbers by adding another 10 Toyota
Yaris petrol/hybrids and 8 electric Hyundai Konas.  
40
53 Invest in a sustainable/low-carbon council fleet, including
charging/fuelling infrastructure.
Medium P We have increased fleet pool booking vehicle availability numbers with the acquisition of an
additional 18 electric/petrol hybrid vehicles (see action 52) and funding has been approved
to purchase an additional 20 electric vehicles over the next 2 financial years. This aligns
directly with our Fleet Carbonisation Strategy.  We are also progressing the development of
the Inveralmond Site which is intended to operate as a dedicated pool booking and electric
charging hub.  This location will support current and future EV expansion by providing
consolidated charging infrastructure, improved vehicle availability, and a more efficient
vehicle pooling operation. We’ve also switched from diesel to HVO for all our RCV Lorries in
Feb 2025 which would be a carbon saving of 750 tonnes and as of 6th April 2026 we are
rolling out a further 13 Waste Disposal Vehicles ranging from 18 tonne to 32 tonne this will
be an approx. saving of 1050 tonnes per annum.
41
54 Support partners in exploring hydrogen vehicles and
refuelling facilities through the Tactran and Tayside Hydrogen
Project.
Medium P PKC does not have plans for creating a Hydrogen refuelling facility at the present time. A
public access Hydrogen refuelling station was to be located on the new Tibbermore
junction opening at Perth West, as part of TCD Low Carbon Transport and Active Travel
Hubs Programme. However the junction will not be in place by 2030, ruling it out as a TCD
project. Friarton Waste Depot was explored as an alternative location which would have
supported PKC Fleet Vehicles, however this was rejected by TCD as a public access
hydrogen station is required under the terms of funding.
42
55 Support partners to develop and roll out Mobility-as-a-
Service (MaaS).
Short P Work is underway on the development of a Perth and Kinross MaaS Journey Planner, funded
by TACTRAN, expected to go live in 26/27.
43
56 Support bus operators to decarbonise bus services, with
consideration to charging infrastructure and fleet.
Long P Supporting provision of new electric buses is beyond current funding. PKC has installed
electric coach charge points at South Inch car park in partnership with Ember and PKC
support of expansion of Ember coach services in terms of bus stop infrastructure and
roadside information.
44
57 Continue to subsidise and review Free Bus Travel schemes:
1) during the lead-up to Christmas and 2) on the first
Saturday of the month during Financial Year 2024-2025, to
encourage and promote public transport.
Short C Free bus travel scheme trial ended on 7 March 2026. A report is being produced with the
outcomes of the trial, hoped to be released in July, with the aim to include comparator bus
usage data following the end of the trial.
45
Page 34 of 126

Page 35

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
58 Support communities to develop Community Action Plans
which consider transport on a local scale, allowing for a
programme of public-led and community-led projects to be
adopted, optimising opportunities from a variety of funding
streams.
Short P CLD focus resources in communities of highest socio-economic need (Rattray, Coupar
Angus, South Crieff, Muirton / North Muirton and Letham) to support projects which
improve people’s life chances in partnership with other PKC and CPP partners.  This aligns
with the SG Fairer Futures programme and the PKC Transformation project on Locality
working. In addition through the Community Minibus Transfer Scheme 12 buses have been
awarded to 12 community groups to support their local transport needs.
46
59 Promote/support community funding opportunities that
allow for local projects to be delivered by Communities for
Communities to promote and deliver investment in public
and private services in communities.
Short P The Council has supported the Ardoch Development Trust to develop a feasibility study for
a path between Braco and Greenloaning that was identified in their Community Action Plan
47
60 Update the Council's Corporate Travel Plan update to align
with the Mobility Strategy's vision and objectives to promote
the Council as an exemplary organisation in relation to active
travel and public transport individually as well as part of
MaaS.
Short P Scoping is underway and a new plan will be put forward for approval in 26/27. 48
61 Continue to support hybrid working, encouraging online video
conferencing/training/meetings, reducing the need to travel
for work, and continue to provide the digital services
required.
Short P ongoing 49
62 Internally promote the Council's Low Carbon Car Scheme
and Cycle to Work Scheme.
Short P The low carbon scheme and cycle to work scheme are currently promoted through ERIC
and will be incorporated into the Corporate Travel Plan
50
63 Promote Liftshare Scheme through social media and
communication platforms.
Short P The Liftshare scheme is currently promoted on the corporate site, however the licence will
not be renewed. Promotion of the national Liftshare platform will be explored through the
staff travel plan and the Perth and Kinross journey planner.
51
64 Promote 'Love My Bus' campaign through social media and
council communication platforms.
Short P We are continuing to promote bus travel through social media platforms and targetted
initiatives in partnership with local bus operators.
removed outdated reference to Love My Bus 52 Promote bus use and services through social media and
council communication platforms.
67 Work with partners to ensure public transport is affordable to
all, specifically for deprived communities.
Short P While ensuring this is beyond available funding, we work with partners to explore
opportunities to improve the affordability of public transport for all, particularly for deprived
communities. Through Tactran we bid for inclusion in Transport Scotland's £2 bus fare cap
pilot, but were unsuccessful. We will liaise with LEP and Tactran in terms of utilising the
transport allocation of the 26/27 Whole Family Support Package funding.
Delete as does not add to Transport Planning
Objective 1  to make transport more affordable
-
68 Create walkable and wheelable city centres and rural village
centres with strategic connections. Early collaboration with
accessibility groups should be carried out to ensure
designs/interventions are fully accessible.
Medium P Working with Centre for Inclusive Living to carry out assessments in specific areas to
identify improvements that can be made for walking and wheeling.  They are also an
important stakeholder/consultee in all major projects being designed.
Delete as this is part of action 2 & 231 -
71 Assess the feasibility of increasing freight transport by rail. Medium N 53
72 Provide high quality and inclusive (i.e. safe, segregated,
direct) active travel infrastructure, focusing on the delivery of
active freeways between Perth City Centre / rural areas to
employment, health facilities, services, leisure and tourism
activities, to encourage more people to walk, wheel and cycle
more often.
Medium P Currently developing proposals to provide high quality infrastructure in Perth, Kinross, Errol
and Scone. These all focus on trying to encourage a shift to active travel modes by providing
safe, high quality routes that connect important services and destinations.
54
73 Implement workshops and training as well as advertisement
and promotional campaigns to increase awareness of the
Avoid-Shift-Improve Framework, and subsequently increase
the number of journeys made by sustainable travel modes.
Short N 55
Page 35 of 126

Page 36

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
75 Work with partners to improve access to healthcare and
social services for those in the lowest SIMD datazones, rural
communities and over-65s through improving public
transport frequency, affordability and connectivity to
healthcare facilities.
Medium P Work is underway with local partners in Crieff and Aberfeldy to address transport barriers
impacting access to healthcare, particularly for low-income households, rural residents
and vulnerable groups. Initial activity has focused on mapping transport gaps and exploring
options such as subsidised travel, demand-responsive services, and better coordination
with health appointment systems; by the end of May, we expect pilot interventions to be
agreed and early implementation underway to improve affordability, connectivity, and
access to essential services
56
76 Provide comprehensive cycle training for vulnerable groups
at all life stages in accordance with the Council's Active
Travel Strategy, including learning to ride in pre-school,
learning to ride on-road through school Bikeability training,
and for adults of all ages, including cycle awareness training.
Short P Cycle training is delivered through a structured, life‑stage approach that provides
pre‑school learn‑to‑ride support, on‑road Bikeability training for school pupils, and tailored
cycling and cycle‑awareness sessions for adults, ensuring vulnerable groups are supported
in line with the Council’s Active Travel Strategy.
57
78 Support the development of inter-city bus coach services
supporting links to Aberdeen, Inverness, Edinburgh &
Glasgow.
Short P Express bus stop improvements will be considered on a site by site basis, as funding allows,
for the provision of bus shelters, RTPI displays and accessibility improvements. In
additional electric coach charging points have been installed at South Inch.
Clarify this is in relation to bus stop infrastructure 58 Support the development of inter-city bus coach services
supporting links to Aberdeen, Inverness, Edinburgh &
Glasgow through improved bus infrastructure and
interchange facilities
80 Encourage the development of a bus network that is fit for
purpose with direct and frequent services on strategic bus
routes, supported by an appropriate secondary network of
scheduled and demand responsive (DRT) feeder services and
efficient interchange provision, including linking with rail
services.
Medium P Transport Transformation project will be progressing this in advance of the 2027 retendering
exercise.
Merge 21, 80 & 182. All relate to aspects to consider
in future provision of bus services
16 Encourage the development of a bus network that is fit
for purpose by investigating options to expand service
levels to fill unmet demand including:
- direct, frequent services on strategic routes
- appropriate scheduled and DRT feeder services
- sufficient off-peak services
- aligning rural public transport services with rail services.
81 Work with operators and developers to ensure that existing
and new employment, education, retail, healthcare, and
tourism destinations are serviced by road-based passenger
transport, particularly in rural areas.
Short P This is covered by National Planning Framework 4, Policy 13. LDP3 needs to take account of
national policy and as such will not include a specific policy on this and is included as part
of LDP site assessmnets. Specific service provision can be considered as part of PKC
supported service contracts.
Moved to list of policy statements POL3
84 Continue to develop and implement bus priority measures to
deliver bus priority on local roads. Measures may include
infrastructural improvements as well as enforcement of
traffic regulations to facilitate the provision of efficient bus
service with improved journey times.
Medium P Bus priority has been introduced at traffic signals on Dunkeld Road, Edinburgh Road,
Dundee Road and Glasgow Road. It gives buses green when they are running late according
to their timetable. Minimal impact currently as there aren't usually big queues, however
once active travel improvements are made on these roads it will mitigate delays to buses.
Dunkeld Road concept design being developed will incorporate bus priority measures.Perth
Circulation Plan feasibility study included bus priority measures in Perth City Centre.
59
85 Explore the potential for providing further discounted travel
schemes to support making travel more affordable.
Short P We will liaise with LEP and Tactran re the transport allocation of the Whole Family Support
Package funding for FY 26/27. See also Anti-Poverty Taskforce update under action 75.
60
86 Ensure that land identified as having potential for Park & Ride
development is safeguarded within the appropriate
Development Plan(s).
Short C Bertha Park and Walnut Grove land is safeguarded in LDP2 and will be considered as part of
LDP3 based on the outcome of P&R feasibility studies.
Moved to list of policy statements POL4
88 Support provision of new, relocated and enhanced train
stations where this will enhance access to the rail network
and improve integration with the area being served.
Long P TACTRAN  has recently completed a study into rail-based park and ride including options for
new stations
61
89 Provide accurate and accessible travel information that is up-
to-date and comprehensive including routes, journey times,
timetables, costs and facilities for all modes. Travel
information should be available in both paper-based and
digital formats.
Short P Transport Transformation Project will progress this via the OBC further to feedback via the
public survey, roadshows and Public Transport Forum
62
Page 36 of 126

Page 37

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
91 Expand the Green Route Networks by increasing the number
of shared use paths, safer crossing locations and cycle
parking. Green Route infrastructure provides walking and
cycling friendly road links on narrow country roads between
communities with reduced speed limits to reduce carbon
emissions and air pollution.
Medium P New green routes are being proposed and delivered. 63
92 Develop an Active Travel Monitoring Plan to collect
qualitative and quantitative data on active travel in Perth and
Kinross. Monitor the outputs to evaluate the impact of active
travel investment and levels of cycling to embed learning in
future decisions and schemes.
Short P Aware of the requirement of this and continuous cycle and pedestrian counts will be
identified and delivered in 2026/27.
64
93 Work in collaboration with the Centre for Inclusive Living to
undertake a Street Audit of crossing locations to identify
locations for dropped kerbs to prioritise the locations where
work needs to be carried out.
Short P Undertaken recent accessment in Milnathort and plan to undertake further assessments
throughout 2026/27.
Merge 93 & 219. Both relate to conducting
accessibilty audits
65 Conduct an accessibility audit on all connections
between key local services in collaboration with the
Centre for Inclusive Living. Provide improvements that
meet inclusive design standards
94 Introduce traffic calming measures to reduce the speeds of
motorised vehicles so that residents and visitors feel safe
using the network.
Short N No plans so far on physical traffic calming measures - sites would need to be identified, a
budget agreed and consultation undertaken
66
96 Disseminate information and maps of cycle and walking
routes throughout Perth and Kinross online and in print
format. Include locations of the Green Route Network, cycle
rack locations and other active travel networks.
Short P Updated active travel map has been created and further work for rural localities is currently
being developed. These will be available in paper and digital format.
67
97 Work with schools to encourage them to have up-to-date
Travel Plans, and continue to provide support to schools for
implementation of the actions within them.
Short P Through the newly reintroduced Junior Road Safety Officer project, schools are supported
through ongoing engagement to maintain up‑to‑date Travel Plans, with guidance and
assistance provided to help them implement the actions and improvements identified
within those plans.
68
98 Support and promote a toolkit for schools and Parent
Councils to set-up and coordinate bike-trains and walking-
buses easily and effectively.
Short P A practical toolkit is promoted and supported—working closely with our Active Travel
Team—to help schools and Parent Councils easily establish and coordinate effective
bike‑trains and walking‑buses.
69
99 Advertise health walks and other programmes to support
people who are less confident about walking or cycling, and
work with Live Active Leisure and Sustrans to support the
projects they undertake in this area.
Short P Live Active continued to run 3 programmes in this area. Buddy Walking helps referred
individuals who are inactive and generally unable to leave their house unaccompanied, to
build up confidence and become independent walkers. Stride for Life is a programme of
walking groups across PKC for people of all ages. All Ability Cycling provides supported,
inclusive and adaptable cycling opportunities for people of all ages, abilities, and health
conditions.
70
100 Achieve Cycle Scotland’s Cycle Friendly status as an
employer, and advocate that other employers as well as
primary and secondary schools also achieve this status.
Short P 16 schools have achieved the Cycling Friendly School award (11 primary, 4 secondary and 1
combined primary/secondary site). Currently 6 are fully acredited and 10 are up for
renewal.
71
101 Encourage all secondary schools to promote active travel to
their pupils and expand the role of I Bike or other similar
projects, to facilitate cycling by secondary school children to
and from school as well as for leisure.
Short P Secondary schools are encouraged to promote active travel through their School Travel
Plans, working with our Active Travel Team to expand the role of I Bike and similar projects
that support and facilitate cycling for school journeys and leisure.
72
102 Promote Park & Stride-sites at schools and seek to encourage
parents/guardians/carers to utilise these locations rather
than parking at the school gate.
Short P Park & Stride sites are actively promoted via school travel plans —encouraging parents,
guardians, and carers to use these designated locations instead of parking at the school
gate to support safer, more active school travel.
73
Page 37 of 126

Page 38

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
103 Improve speed limit compliance and further enhancement of
safety across the road network by following the Scottish
National Speed Indicator and increase the use of visual
deterrents and enforcement across the road network,
particularly in areas of high deprivation and higher than
average crash casualties.
Short P Update to Police Scotland when speed limits are changed. We pass on enforcement
concerns to local inspector
74
107 Work with partners to undertake a Fair Fares Review (in line
with National review) to ensure a sustainable and integrated
approach to public transport fares.
Short P Margaret Roy will progress this via her role in ATCO Scotland and Transport Scotland
meetings that she attends
75
110 Work with partners to develop smart, integrated ticketing and
payment services, to modernise, simplify and enable
convenience for passengers accessing public transport.
Provide alternatives (for example, physical ticket machines)
for those without digital access at key public transport
interchanges.
Medium P PTU liaise with National Smart Ticketing Advisory Board closely regarding the national work
on this area.
76
111 Deliver connected neighbourhoods within towns and cities to
better achieve connected and more accessible communities
following the 20-minute neighbourhood concept, so that as
many people as possible can meet the majority of their daily
needs within a reasonable walk, wheel or cycle of their home.
Medium P This is covered by National Planning Framework 4, Policy 15. LDP3 needs to take account of
national policy and as such will not include a specific policy on this.
Moved to list of policy statements POL5
115 Deliver improved and safer walking, wheeling and cycling
routes to primary and secondary schools, created through a
comprehensive package of behavioural change measures
and local infrastructure schemes.
Short N Safe Routes to School assessments to be undertaken. 77
116 Deliver a behaviour change programme that improves access
to bikes for all (including adapted bicycles, e-cycles and
cycle share) and provides schools, workplaces, communities
and disadvantaged groups with the confidence and skills to
cycle, such that they can make use of new or existing active
travel infrastructure.
Short P A behaviour change programme will be delivered by improving access to a range of
bikes—including adapted cycles, e‑cycles and cycle‑share—and by providing tailored
training and support to schools, workplaces, communities and disadvantaged groups,
enabling them to develop the confidence and skills needed to make full use of active travel
infrastructure.
78
117 Support a programme of improvements, such as junction
upgrades and permissible speed increases, to achieve
journey time improvements and line capacity increases for
passenger and freight services in line with STPR2 Tay Cities
recommendations and Rail Services Decarbonisation Action
Plan.
Medium N 79
118 Provide access for all at public transport interchanges,
supporting Scotland’s Accessible Travel Framework. Roll out
a programme of interchange upgrades by focussing on
improved infrastructure design to, and within bus stations,
and improved information, signage and wayfinding by
upgrading the accessibility and quality of passenger facilities
at existing stations and stops or, where needed, construction
of new facilities.
Medium P As funding allows the roll out of RTPI screens throughout the Council area is ongoing and we
now have 116 displays at bus stop locations & interchanges across the network.
80
119 Support the decarbonisation of Perth and Kinross' transport
network by ensuring there are new and expanding recharging
/ refuelling networks as well as technological change.
Medium P As part of the EVIF work, the public electric vehicle charging network is expanding. Electric
coach charging facilities have also been added at South Inch in October 2024.
Delete as this is an overarching action. Separate
actions to decarbonise cars, buses, rail, taxis and
PKC fleet.
-
Page 38 of 126

Page 39

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
120 Support partners to progress road safety improvements
across the trunk road and motorway network with a primary,
but not exclusive, focus on rural sections where accident
rates and severities are typically higher. The types of
improvements would include junction improvements (such
as right-turn priority, signalisation, at-grade roundabout and
grade-separation) as well as junction rationalisation,
realignment/widening of carriageways and provision of
overtaking opportunities.
Long P Take part in the A9 safety group with regular meetings discussing impact on local road
network and junctions onto the A9.
Merge 120, 220, 221 & 222. All relate to supporting
Transport Scotland as necessary to make
improvements to the trunk road network
81 Support Transport Scotland to improve the safety and
resilience of the trunk road network across PKC (STPR2
recommendations 30-32)
121 Support partners to deliver measures to reduce the adverse
effects of trunk road traffic on people walking, wheeling and
cycling in those communities that have a trunk road passing
through them by, for example, reducing traffic speed,
improving the width and quality of paths and upgrading road
crossing facilities.
Medium P Transport Scotland Trunk Roads Team are undertaking a feasibility study for a new
controlled crossing of the A85 in Crieff near MacRosty Park
82
123 Engage the business sector to embed active travel in wider
corporate culture, encouraging the use of cargobikes as the
preferred choice for local deliveries enabling goods to be
moved in a green way.
Short N Merge 38 & 123. Both relate to last mile deliveries /
cargo bikes. Separate out a separate action on
welfare facilities
29 1) Support partners and the business sector to assess
options and implement measures to embed the
sustainable last-mile movement of goods within
corporate culture, encouraging the use of cargobikes as
the preferred choice for local deliveries.
2)Encourage the development of resting and welfare
facilities for haulers
124 Work with partners to improve vehicle accessibility and the
integration of buses and trains by increasing the space to
accommodate persons with disabilities, reduced mobility,
prams and/or cycles.
Short N 83
125 Reduce road accident casualties by delivering a range of
speed management initiatives, for example social marketing
campaigns or speed awareness, to ensure that road users
understand why speed limits are set and the need to comply
with them.
Short P We aim to reduce road accident casualties through community‑based engagement and
education, supported by early road user awareness training delivered by Police Scotland
and SFRS. Providing age‑appropriate speed awareness sessions in schools helps children
understand why speed limits exist and builds safer habits from an early age. Over time, this
approach supports improved compliance and safer driving behaviours across the wider
community. Engagement with Community Councils and residents regarding road safety
issues will continue in order to identify areas of improvement.
84
128 Undertake a review of nature-based, green and blue
infrastructure interventions which can benefit air quality,
using the outcomes to develop a database of potential
solutions for both regeneration and new developments.
Short N We are updating our blue and green infrastructure (BGI) assets and opportunity mapping for
LDP3, we are not yet specifically reviewing nature-based solutions for air quality.
85
130 Safeguard access rights and core paths, including active
travel routes, and encourage new and enhanced
opportunities for access linking to the wider active travel
network. Protect and enhance green (land) and blue (water)
infrastructure and their networks.
Short P Ongoing - CGS deal with reported obstructions to outdoor access and support 18 volunteer
path groups to help maintain and improve local path networks and infrastructure
86
131 Encourage, promote and facilitate spaces and opportunities
for play, recreation and sport that are inclusive and enable
children and young people to play and move around safely
and independently, maximising opportunities for informal
and incidental play.
Short P CGS manage 146 childrens play areas, 12 skate parks and 90 outdoor sports pitches and
over 1600 parks and open spaces - refer to the Corporate Assert Management Plan and
Open Space Strategy.
Moved to list of policy statements POL6
Page 39 of 126

Page 40

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
133 Ensure that retail development and the location of shops can
be accessed by communities by a range of sustainable
transport modes including on foot, by bike, and by public
transport.
Medium P This is covered by National Planning Framework 4, Policy 13. LDP3 needs to take account of
national policy and as such will not include a specific policy on this.
Moved to list of policy statements POL7
134 Engage widely across industries to explore and create
opportunities for changing technologies and innovation, such
as addressing grid capacity constraints, implementing
consolidation centres and integrating renewable energy
generation, distribution and storage to reduce carbon
emissions.
Medium N 87
137 Work with regional partners to pilot integrated parking and
charging payments through an integrated mobility platform.
Short N 88
138 Explore the provision of electric car club vehicles (and
associated charging infrastructure) as part of new housing
developments.
Short P This is covered by National Planning Framework 4, Policy 13 (biv). LDP3 needs to take
account of national policy and as such will not include a specific policy on this. In addition
Transport & Development will be exploring options for the establishment of car clubs in the
PKC area
Moved to list of policy statements POL8
139 Engage with car club operators to address barriers to greater
levels of uptake, e.g. dependence on back-to-base model.
Short N Merge 139 & 140. Both relate to engagement with Car
Club operators
89 Engage car club operators to address barriers to greater
levels of uptake (e.g. back-to-base model, limited
information on using electric club vehicles)
140 Engage with car club operators to improve information
(including in-vehicle information) on using electric club
vehicles.
Short N Merge 139 & 140. Both relate to engagement with Car
Club operators
89 Engage car club operators to address barriers to greater
levels of uptake (e.g. back-to-base model, limited
information on using electric club vehicles)
141 Enable inclusion of an electric car sharing vehicle at the site
of any significant charging infrastructure.
Short N Moved to list of policy statements POL9
142 Continue to participate and support in Tactran's Regional EV
Steering Group forum to share data and learning from EV
deployment to accelerate the transition and identify barriers
to adoption.
Short P Transport and Development are an active member of this steering group which helped lead
to the joint EVIF funding award with Angus Council
90
143 Work with partners to introduce a scheme to directly support
local businesses to help them understand and consider the
financial and environmental benefits of driving an electric
vehicle.
Short P The Council has previously provided a Green Capital Development Grant for businesses
that could be used to install electric vehicle charging points.
91
146 Improve/provide active travel crossings that can
accommodate cycling over the River Tay.
Long P Options are included as part of the Perth Circulation Plan feasibility study and the Perth City
Centre Design & Development Framework
92
147 Review National Cycle Network (NCN) and NCN
Development Plan (NDP) intersecting with Perth & Kinross
Council to explore feasibility options to connect NCN routes.
Short P The NCN will be reviewed as part of developing the Active Travel Strategy and we will
continue to liaise with the Walk Wheel Cycle Trust on the NDP.
93
Page 40 of 126

Page 41

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
148 Ensure new / improved infrastructure avoids increasing flood
risk and reduces risk of flooding.
Short P Perth & Kinross Council continues to apply National Planning Framework 4 (NPF4) Policy 22
and the Flood Risk Management (Scotland) Act 2009 to ensure all new or improved
infrastructure is designed to avoid increasing flood risk, supported by SEPA’s statutory role
and updated national guidance clarifying planning authorities’ responsibilities.  Transport
Scotland remains responsible for safeguarding the resilience of the trunk road network and
must be consulted where national transport infrastructure could influence or be affected by
flood risk, ensuring that both strategic transport assets and local developments contribute
to reducing overall flooding impacts. The same principles apply to drainage infrastructure
via Scottish Water and rail infrastructure via Network Rail.
Moved to list of policy statements POL10
149 Continue to work with local communities, key stakeholders
and resilience groups in the co-design of projects to build
better places together, while seeking to expand the range and
number of opportunities for co-design by making use of
external funding sources.
Short P Ongoing Moved to list of policy statements POL11
150 Integrate sustainable urban drainage systems in design and
placemaking to reduce surface water flooding/run-off.
Short P Sustainable drainage options are considered and implemented where possible on
infrastructure projects.
Moved to list of policy statements POL12
151 Work with broadband providers to develop affordable,
sustainable internet access, and with partners such as social
housing providers and caregivers, provide the residents with
training and support to develop basic digital skills to facilitate
reduction in travel demand in relation to employment and
services.
Short P PKC have a single Point of Contact working to support R100 and project Gygabyte acting as
a telecoms unit to support digital infrastructure investment. Through market engagement
with private providers and government interventions such as the SBVS Superfast broadband
Voucher Scheme and the GBVS Gigabit Voucher Scheme, we have supported the
deployment of connectivity in the region. We have also supported fibre community
partnerships across communities to deploy further connectivity networks. PKC also
supported the regional Broadband Engagement project in 2024-2025 to deliver, promote
and improve access to digital via UK UKSPF project. This all supports an active market
market to deploy affordable connectivity to support the deployment of digital skills
94
152 Grow network of Community Climate Action Hubs,
supporting local communities to develop place-based
approaches to reduce emissions and become more climate
resilient.
Short P The Council supports and works together with Climate Connect, the Perth and Kinross
Climate Action Hub, to support over 60 community groups with their climate action work.
Climate Connect Perth & Kinross “aims to connect people through a collaboration of
established and emerging community networks of those taking action for nature, food,
energy, transport and zero waste as well as the local Climate Café® Network.” A member of
the Climate Change and Sustainable Development Team sits on the Climate Connect
Board, playing an active role in support local community climate action.
95
153 Ensure developments consider place and prioritise the needs
of people before the movement of motor vehicles in line with
national and local design guidance. This includes prioritising
sustainable and active travel choices, and including fully
accessible paths and routes which are well connected with
the wider environment beyond the site boundary.
Short P This is covered by the National Roads Development Guide and Designing Streets Moved to list of policy statements POL13
154 Ensure developments consider the impact on the path
network and be consistent with the Scottish Outdoor Access
Code.
Short P LDP2 policy refers to Core Path plan and proposed to continue this approach into LDP3 Moved to list of policy statements POL14
156 Work with land managers to ensure existing woodlands are
managed and enhanced for a range of benefits, including
public access and biodiversity.
Short P CGS manage a number of 'Countryside' sites which provide woodland access and uphold
public access rights in all other woodland areas where access is provided.  The Place
Strategy team in Economy, Development & Planning  will also have a role in overseeing
private woodland areas.  Both teams will look to protect and enhance biodiversity wherever
appropriate.
Moved to list of policy statements POL15
Page 41 of 126

Page 42

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
158 With partners, promote the health benefits of outdoor
recreation and GP-led green health referrals.
Short P Live Active run the Buddy Walking programmes which helps referred individuals who are
inactive and generally unable to leave their house unaccompanied, to build up confidence
and become independent walkers.
96
159 Develop a rural approach/equivalent to the 20-minute
neighbourhood concept in and around villages and towns to
enhance local accessibility, help tackle societal causes of
inequality, and reduce social isolation and loneliness.
Short P LDP3 is looking at how this can be addressed through the spatial strategy/ clustering Moved to list of policy statements POL16
161 Protect and incorporate green infrastructure within all new
infrastructure schemes and developments, capitalising on
opportunities across Perth and Kinross to promote active
travel and make connections where possible to blue and
green networks to provide a multifunctional network with
multiple benefits for climate and nature.
Short P LDP2 and NPF4 policies on blue green infrastructure seek to safeguard, enhance and
expand BGI networks. Between the relevant planning consultees (Biodiversity Officer, CGS,
LDP) these policies are applied and deliver this action on a continuous basis. To inform the
preparation of LDP3 and the Open Space Strategy we are updating our BGI asset and
opportunity mapping through a combination of desk-based assessment and community
engagement. This will support the delivery of the policy objectives by providing further
evidence base for planning and design considerations.
Moved to list of policy statements POL17
163 Work with regional partners to further encourage
development and employee use of Green Travel Plans in large
workplaces.
Short P In 25/26 Tactran funded Calcommuter to offer personalised journey planning to staff at 5
large workplaces PRI, SSE, UHI Perth James Hutton Institute and PKC (High St, Pullar House
and Carpenter House). Due to Transport Scotland cuts to Tactran People and Place
programme these interventions are not continuing into 26/27.
97
164 Keep the City Centre Traffic Management Review under
continual review. The Council's Traffic and Environmental
Teams will liaise regularly to discuss the effects of
component measures of the CCTMR on air quality.
Short P Ongoing 98
166 Assess the potential options for smart parking to facilitate
effective location of available parking spaces, and in doing
so, reduce adverse impacts on congestion and air quality.
Short N 99
168 Establish Tayside Physical Activity and Green Health Network
with partners to develop pathways to support people to be
active in their own community.
Short N 100
169 Provide access for everyone to activities prescribed by social
prescribers and link social prescribers to GP practices.
Medium P P&K HSCP have a team of Community Link workers (previously called Social Prescribers)
who work across the area to support people to connect with social activities. 
101
172 Develop pocket places in key areas with cycle infrastructure
and maps / area information, and public transport
timetables.
Short P To be delivered as part of improvements at Kinross Park and Ride in 2026/27. 102
173 Explore potential for parking areas outwith town centres
across Perth and Kinross, including Park-and-Ride / Park-and-
Choose.
Short N 103
176 Improve connections between village/town centres and
greenspaces to encourage locally made active travel trips for
the benefit of recreation, health and wellbeing and local
economy.
Medium P CGS work in partnership with PKCT on a number of projects for example Crieff to Comrie
and Stanley to Luncarty Core Paths
104
177 Work with bus service providers to provide hopper bus
services around towns and settlements to increase direct
connectivity to key amenities and services.
Short P Transport Transformation Project OBC and Local Bus Network review in 26/27 will action
this.
105
179 Improve access for emergency healthcare in rural areas
where there is concern for the journey time for ambulances
and the lack of doctors in the area.
Short N All residents of P&K have access to emergency healthcare through, 999 Ambulance Service,
NHS 24 services.  All areas of P&K have General Practice cover.
106
Page 42 of 126

Page 43

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
180 Ensure there is a sufficient number of voluntary or paid bus
drivers for community run buses in rural communities.
Short P While ensuring supply of volunteers is beyond our control, we encourage and support
people to volunteer as bus drivers for community run buses in rural areas via the
Community Transport Forum and the Public Transport Forum and with collaberation with
the Community Transport Association
Merge 43 & 180. Both relate to Community Transport.
Added reference to community car schemes
35 Encourage, support and promote Community Bus
Partnerships (including the supply of bus drivers) and
transport services across Perth and Kinross to provide
additional options. Services may include dial-a-bus
services, Community Bike Hubs, community minibuses
and existing schemes, such as community car schemes
& the Glenfarg Community Transport Group.
181 Explore feasibility to pedestrianise village, town and city
centres on a permanent/seasonal basis to create more
liveable and accessible centres for both residents and
visitors, and to boost local economy.
Short N Economic Development is due to restructure in May 2026. Within the restructure a
Placemaking & Localities team will be created. Part of that function will be to look at
localties and create development guides for these areas, looking at potential key areas of
intervention. This will involve enagement with our rural towns. Feasibilty around the likes of
pedestrianisation of areas (permanent or seasonal) can be included within that remit. 
107
182 Ensure there is sufficient availability of public transport
services during off-peak times such as weekends and
evenings, particularly in rural areas.
Short P Public Transport Unit will review evening/weekend service levels (as part of Transport
Transformation Project) and investigate options to expand them to fill unmet demand in
conjuction with the full network review.
Merge 21, 80 & 182. All relate to aspects to consider
in future provision of bus services
16 Encourage the development of a bus network that is fit
for purpose by investigating options to expand service
levels to fill unmet demand including:
- direct, frequent services on strategic routes
- appropriate scheduled and DRT feeder services
- sufficient off-peak services
- aligning rural public transport services with rail services.
184 Expand pavements to the houses on the edges of rural
villages and towns.
Long P We have a list of rural footways but we do not have a separate budget to deliver these 108
185 Improve access to Park-and-Ride services for non-car owners
and car owners by, for instance, ensuring there is a sufficient
number of park and ride locations that are connected with
sustainable transport networks in order to reduce kilometres
travelled.
Short P Design work underway for Kinross Park & Ride to Kinross High St active travel route
improvements
Merge 6, 7 & 185. All relate to improvements at
existing Park & Ride sites
6 Explore the feasibility of expanding the extent and
capacity of existing park and ride sites, and integrate all
modes of transport at the locations to improve
sustainable and active travel choices
186 Continue to implement the Council's newly adopted
Corporate Asset Management Policy (CAM Framework
January 2024).
Short P Ongoing Delete, delivered as business as usual -
187 Work with Tactran's Regional Freight Quality Partnership to
develop a Freight, Logistics and Deliveries Plan to ensure that
logistics and distribution networks move goods efficiently
and sustainably to businesses and consumers. This may
include, for instance, exploring the role of consolidation
centres along the strategic road corridors.
Short N Tactran are planning to restart their Regional Freight Quality Partnership later in 2026 and
PKC have expressed an interest in joining
109
188 Develop a Public Transport Strategy to guide the
development of the public transport system across the region
for the benefit of those visiting, working and living in Perth and
Kinross.
Short P Will be included in the Transport Transformation Project work once the OBC is completed. 110
189 Conduct a traffic safety audit on all major roads and across
all settlements larger than 1,000 residents, within 5km of
schools. Carry out improvements based on findings.
Medium P Route Action Plans have been discussed in the past. We will continue with assessing our
main A class roads. We will also identify issues on our network through data analysis
111
190 Explore potential of removing, reducing, reallocating on- and
off-street parking across Perth and Kinross to create space
for sustainable and active travel and public realm.
Short N We can liase with the parking team regarding this as part of the Parking Strategy 112
195 Conduct a review of signage in relation to existing active
travel routes (e.g. NCN, core paths) and signposting to key
amenities/ services/ attractions/ gateways.
Short P Some signage has been reviewed on National Cycle Network route 77 and further signing
review planned for 2026/27.
113
Page 43 of 126

Page 44

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
196 Explore the feasibility and identify appropriate locations for
implementing Cycle Streets (i.e. prioritisation of cycle users
within a mixed street environment with motor traffic to be
treated as ‘guests’) and/or Filtered Streets (i.e. filtered
access for motor traffic while delivering permeable access
for walking, wheeling and cycling) to encourage active travel.
Short N To be included and considered as part of new active travel routes as part of the design
process.
114
199 Explore the feasibility and support delivery of expanding the
network of long-distance off-road shared paths for
commuting and recreational travel. This may include the
review of, for example, Countryside Trust's active travel
projects and re-utilisation of disused railway lines for
walking, wheeling and cycling, particularly between rural
settlements.
Short P Some projects are underway but funding is sporadic from Transport Scotland and WWCT. 
There is no PKC funding currently to develop any programmes but should be considered.
CGS work in partnership with PKCT on a number of projects.
A number of long distance routes already exist but there is a lack of resource to enable a
programme of feasibility and development to be undertaken.
115
201 Work with communities to provide support in the process for
applying for an under-22's bus pass.
Short P CSC staff provide this support on an ongoing basis and PTU liaise with them. 116
204 Review the pricing of parking across Perth and Kinross. Short P New tariffs were approved by Council and will come into effect on 27 April.  This will see an
slight increase in charges on-street and in short stay car parks, however long stay car parks
at Kinnoull Street MSCP, Canal Street MSCP and Thimblerow will see their tariffs reduce in
line with private competitors.
117
205 Develop and deliver a seasonal Maintenance Plan for active
travel facilities to clear them of overgrown vegetation, fallen
leaves, snow and ice.
Short P Ongoing - CGS manage maintenance opertations on council owned or managed
greenspaces  and support 18 volunteer path groups to help maintain and improve local path
networks and infrastructure.
118
206 Integrate art and design within projects to encourage active
travel and enhance public realm by, for example, exploring
ways to incorporate it into empty spaces, into
navigation/wayfinding, and at public transport interchanges.
Short N Not started Moved to list of policy statements POL18
207 Together with partners, explore the feasibility of providing
secure off-street cycle parking at public transport stops and
stations. Secure cycle parking should accommodate various
cycles, such as cargobikes, tricycles, wide-tyred cycles,
cycles with trailers in addition to providing facilities for
storing accessories, such as saddlebags and helmets during
the duration of parking to encourage linked trips by active
modes.
Short P Secure, bookable bike hangars have been installed as pilots at West Kinfauns (for Ember
bus users primarily) and Broxden and will be reviewed. Three large secure lockers (to be
locked with users’ own padlock) installed at the bus stop on Dundee Road, Meigle. These
have hooks for equipment and space for panniers, helmets etc.
ScotRail has actively been removing cycle lockers from their stations for both safety and
security reasons.  They do not have any plans to install lockers at stations in Scotland and
note cycle parking at their stations is covered by CCTV monitoring, but cycles are left at the
owners risk.
119
209 Work with bus companies to improve the experience within
bus stations by providing free facilities such as adequate
seating, well maintained toilets, water refill stations and fast
Wi-Fi.
Short P Perth Bus Station refurbishment works have been ongoing since Summer 2025 (circa £20k). Merge 209 & 234. Identical wording in separate
actions covering bus and railway stations
120 Work with public transport providers to improve the
experience within railway and bus stations, by providing
free facilities such as adequate seating, well maintained
toilets, water refill stations and fast Wi-Fi
210 Work with operators to provide on board audio-visual
facilities on buses (including naming and announcement of
bus stops) to improve accessibility for older people and
people with visual or hearing impairments.
Short P This is mandated by Public Service Vehicles (Accessible Information) Regulations 2023 and
PTU reference this in their Conditions of Contract.
121
213 Work with partners to improve the viability of choosing to
travel by bus, particularly in rural areas. The improvements
may be in relation to reliability and frequency of bus services.
Medium P Progressing via Tayside Bus Alliance as well as the Transport Transformation Project and
local bus network review.
122
Page 44 of 126

Page 45

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
219 Conduct an accessibility audit on all connections between
key local services. The audit should focus on the experiences
of underrepresented groups, such as older people, women,
disabled people and people with accessibility issues. Provide
improvements that meet inclusive design standards for
primary facilities and ancillary infrastructure.
Medium N Merge 93 & 219. Both relate to conducting
accessibilty audits
65 Conduct an accessibility audit on all connections
between key local services in collaboration with the
Centre for Inclusive Living. Provide improvements that
meet inclusive design standards
220 Support Transport Scotland on the delivery of STPR2
recommendation 30 to improve trunk road and motorway
safety to progress towards 'Vision Zero' where there are zero
fatalities and injuries on Scotland’s roads by 2050. STPR2
recommends road safety improvements are progressed
across the trunk road and motorway network with a primary,
but not exclusive, focus on rural sections where accident
rates and severities are typically higher. Measures are likely
to include one or a combination of junction improvements,
carriageway widening, route realignment and provision of
overtaking opportunities. The location and type of
improvements on specific routes requires further detailed
investigation, potentially through the development of route
action plans.
Long P We liase with Transport Scotland and trunk road agencies regarding this Merge 120, 220, 221 & 222. All relate to supporting
Transport Scotland as necessary to make
improvements to the trunk road network
81 Support Transport Scotland to improve the safety and
resilience of the trunk road network across PKC (STPR2
recommendations 30-32)
221 Support Transport Scotland on the delivery of STPR2
recommendation 31 to adapt trunk roads and motorways to
the impacts of climate change to improve network safety,
reliability and resilience. STPR2 recommends building on
existing evidence around vulnerable locations to develop a
fuller picture of those areas on the trunk road and motorway
network most at risk of disruption due to weather events. This
would provide a basis for identifying, prioritising and
implementing improvements.
Long N Merge 120, 220, 221 & 222. All relate to supporting
Transport Scotland as necessary to make
improvements to the trunk road network
81 Support Transport Scotland to improve the safety and
resilience of the trunk road network across PKC (STPR2
recommendations 30-32)
222 Support Transport Scotland on the delivery of Support STPR2
recommendation 32 to improve reliability, resilience and
safety by renewing and refurbishing trunk roads and
motorways. STPR2 recommends continued and increased
investment in the trunk road and motorway network over and
above current maintenance levels to keep the network
reliable and resilient for road users. Potential measures
would include, but are not limited to, carriageway and
structure schemes, strengthening of major bridges, removal
of accessibility barriers and development of integrated
transport plans.
Long P PKC supports Transport Scotland with their works on the trunk road network, insofar as
there are interventions required on local roads.
Merge 120, 220, 221 & 222. All relate to supporting
Transport Scotland as necessary to make
improvements to the trunk road network
81 Support Transport Scotland to improve the safety and
resilience of the trunk road network across PKC (STPR2
recommendations 30-32)
223 Continue to monitor and model traffic flows across Perth City
to understand the impacts of new developments and traffic
management alterations on air quality, and look for
opportunities to align with the regional model.
Short P Procurement of Traffic Modelling software is on-going and will allow PKC to model traffic
flows and appraise development scenarios as part of LDP3.
123
224 Ensure that the access of agricultural traffic is duly
considered in infrastructure projects.
Short P Ongoing Moved to list of policy statements POL19
225 Following the completion of Perth Transport Futures Phase 1
in 2019, complete phase 2 (‘Destiny Bridge’ and
accompanying infrastructure) and phase 3 (Bertha Park
North Link).
Short P The Cross Tay Link Road and Destiny Bridge opened in March 2025 and the Bertha Park Link
Road is nearing completion and is likely to open mid to late June 2026
124
Page 45 of 126

Page 46

ID Action Timescale
Status
complete (C)    
in progress (P)
not started (N)
May 2026 update Proposed action changes
New
ID Revised wording
226 Ensure the continued operation of the public transport
system to meet the needs of the residents and visitors across
Perth and Kinross.
Short P Transport Transformation Project OBC will focus on this and OBC is due to be presented to
Full Council on 02 Sept 2026
125
227 Continue to ensure that, at minimum, the designs for
transport developments meet standards and the National
Roads Development Guide (NRDG).
Short P By consulting on planning applications and technically appraising RCCs we continue to
ensure that as a minimum, the design of new developments meets NRDG standards.
Moved to list of policy statements POL20
228 Continue the roll out of network improvements as part of
Cycling, Walking and Safer Routes.
Short P Installed 2 CWSR's in 2025-26 with more potential sites identified Delete as this action is generic and covered by
numerous other actions related to developing and
improving active travel routes
-
229 Continue to develop and deliver the implementation of on-
going behaviour change initiatives, for example through
supporting the People and Place Programme. Initiatives
could include, for instance, community engagement
(Bikeability Officer, Community Active Travel Coordinator),
bus improvement (Real Time Passenger Information screens
and free bus days), and marketing and promotion activities
with communities, workplaces and schools.
Short P Duplicates other action updates including bikeability (76), community active travel (
101,116), cycle maps (96) and RTPI (26).
Delete as this action duplicates numerous more
specific actions relating to behaviour change
initiatives.
-
230 Continue to support and work alongside partners such as
Network Rail, Sustrans, and Tactran to help operate and
enhance existing transportation systems.
Short P We continue to work alongside partners to advance transport planning schemes. It should
be noted that this action has been filtered out of the revised action list as it duplicates more
focused, targeted actions.
Delete as this is a generic statement covered by
numerous other actions
-
231 Make improvements within town and village centres to
reduce car dominance and improving sustainable and active
travel choices. Improvements may consider: parking and
road space reallocation, traffic management arrangements,
connecting services, and placemaking to optimise traffic
flows and the space available, and improving sustainable and
active travel choices to reduce congestion and local
emissions.
Medium N 126
232 Support partners to improve the access for all at public
transport interchanges supporting Scotland’s Accessible
Travel Framework. With partners, deliver a programme of
interchange upgrades by focussing on improved
infrastructure design to, and within railway stations, and
improved information, signage and wayfinding by upgrading
the accessibility and quality of passenger facilities at existing
stations or, where needed, construction of new facilities.
Medium P Upgrades are delivered as part of Network Rail's Access for All Programme Merge 24, 232 & 233.All relate to improving the
accessibility of railway station and services.
18 Support partners to conduct audits of rail interchange
accessibility and security and to deliver a programme of
improvements to improve accessibility of railway
stations and services.
233 Support partners to conduct audits of rail interchange
accessibility and security, and deliver a programme of
improvements to enable increased use and modal shift.
Medium P Upgrades are delivered as part of Network Rail's Access for All Programme Merge 24, 232 & 233.All relate to improving the
accessibility of railway station and services.
18 Support partners to conduct audits of rail interchange
accessibility and security and to deliver a programme of
improvements to improve accessibility of railway
stations and services.
234 Work with rail companies to improve the experience within
train stations by providing free facilities such as adequate
seating, well maintained toilets, water refill stations and fast
Wi-Fi.
Short N Merge 209 & 234. Identical wording in separate
actions covering bus and railway stations
120 Work with public transport providers to improve the
experience within railway and bus stations, by providing
free facilities such as adequate seating, well maintained
toilets, water refill stations and fast Wi-Fi
Page 46 of 126

Page 47

New
ID Action Timescale
1 Continue the roll-out of the Perth People Place Programme to develop sustainable and active
travel corridors with local communities - piloted by the Dunkeld Road Corridor.
Corridors to be considered:
Glasgow Road
Dundee Road
Edinburgh Road
Perth Road (Scone to  Perth)
Medium
2 Make improvements within Perth City Centre to reduce car dominance and improve sustainable
and active travel choices. Improvements may consider: parking and road space reallocation,
traffic management arrangements, connecting services, and placemaking to optimise traffic flows
and the space available, and improve sustainable and active travel choices to reduce congestion
and local emissions.
Short
3 Design and deliver a 'City Centre Mobility Hub' to provide an integrated transport hub in Perth City. Medium
4 Develop and deliver a 'Strategic Mobility Hub' at Walnut Grove, to provide local and strategic
transport links with integrated transport choices.
Short
5 Develop and deliver a  'Strategic Mobility Hub' at Bertha Park, to provide local and strategic
transport links with integrated transport choices.
Short
6 Explore the feasibility of expanding the extent and capacity of existing park and ride sites, and
integrate all modes of transport at the locations to improve sustainable and active travel choices
Short
7 Explore options for local Mobility Hubs within rural communities to integrate modes across rural
neighbourhoods and improve public transport links, identifying arterial bus routes, optimise the
council bus subsidy budget and working in partnership with community transport providers.
Medium
8 Support partners with the development of the Perth Railway Masterplan, encourage the integration
of the bus station and other sustainable and active travel modes.
Short
9 Update the existing Active Travel Strategy that works for everyone in line with Transport Scotland's
Active Travel Strategy Guidance (February 2023).
This will adopt and combine the vision and objectives of the Mobility Strategy, Tactran's emerging
regional active travel network, and the Perth Cycle Network Masterplan to complement the radial
sustainable corridors to and from Perth City. Support also, the development of local masterplans
to present local aspirations, such as Kinross Active Travel Masterplan.
Short
10 Continue to improve on- and off-street public and residential cycle parking across village, town
and city centres. Ensure that cycle parking is secure and if feasible, covered. Secure cycle parking
should accommodate various cycles, such as cargobikes, tricycles, wide-tyred cycles, cycles with
trailers in addition to providing facilities for storing accessories, such as saddlebags and helmets
during the duration of parking to encourage linked trips by active modes.
Short
11 Explore universal speed limit reductions, 20mph across all residential streets along with further
speed reductions.
Short
12 Assess and review Core Path Plan path assets and deliver a programme of improvements. Long
13 Work alongside partners TACTRAN to design and develop, or improve the regional active travel
network to connect Perth and Kinross with other regions, cities and major gateways using high
quality active travel infrastructure that segregates users form busy roads and makes use of quiet
roads where appropriate.
Long
14 Support partners in the delivery of National Cycle Network enhancements to ensure they work for
everyone.
Medium
15 Conduct audits of bus stop and bus interchange accessibility and security, and support partners to
deliver a programme of improvements to enable increased use and modal shift.
Medium
Appendix C 4
Page 47 of 126

Page 48

New
ID Action Timescale
16 Encourage the development of a bus network that is fit for purpose by investigating options to
expand service levels to fill unmet demand including:
- direct, frequent services on strategic routes
- appropriate scheduled and DRT feeder services
- sufficient off-peak services
- aligning rural public transport services with rail services.
Short
17 Explore options to improve sustainable transport and active travel connections to bus and railway
stations across Perth and Kinross.
Medium
18 Support partners to conduct audits of rail interchange accessibility and security and to deliver a
programme of improvements to improve accessibility of railway stations and services.
Medium
19 Support Transport Scotland and partners in the decarbonisation of Scotland's passenger rail
services by 2035.
Long
20 Conduct audits of bus stop ancillary infrastructure. Deliver improvements on the basis of findings
to encourage increase in use. Improvements may include bus shelters, seating, cycle parking, and
enhancements to legibility, such as digital display boards with real time information and signage
and wayfinding.
Medium
21 Finalise and deliver an EV Infrastructure Strategy that will include on and off-street charging
infrastructure and develop a private/public partnership for delivery and operation.
Medium
22 Develop an asset management platform (e.g. a mapping tool), used to highlight the status of the
road network, allowing for a clear and prioritised programme of work that can be well
communicated and easily shared. This will help find coworking opportunities, optimise them, and
minimise disturbance to existing live network.
Short
23 Encourage sustainable procurement options for large maintenance contracts. Short
24 Together with partners, continue to inspect, maintain and improve road structures across Perth
and Kinross to retain climate resilient networks.
Short
25 Together with partners, continue to develop and deliver Flood Protection Schemes (FPS) under the
Flood Risk Management Strategy - Tay Local Plan District to reduce flood risk across the identified
vulnerable areas. Ensure to consider transport network resilience and accessibility issues as well
as dwelling flooding.
Short
26 Develop a Strategic Parking Policy to align with the Mobility Strategy's vision and objectives that
will assess utilisation, integration, parking provision, demand, safety and sustainable transport
alternatives. The high-level strategic framework will enable strategic, tactical and operational
decisions on parking arrangements to be undertaken using an evidence-based decision-making
process. The Parking Policy may include, for instance, guidance on cycle parking requirements and
appropriate storage types, and reduction in car parking requirements for new developments.
Short
27 Implement and enforce pavement parking in line with the Transport (Scotland) Act 2019. Short
28 Encourage, promote and facilitate the roll out of digital infrastructure, such as fast broadband/5G
across PKC and particularly in rural areas and those on low incomes in line with PKC Digital
Strategy.
Medium
29 Support partners and the business sector to assess options and implement measures to embed
the sustainable last-mile movement of goods within corporate culture, encouraging the use of
cargobikes as the preferred choice for local deliveries. 
Short
30 Encourage the development of resting and welfare facilities for haulers
31 Support trialling and the adoption of innovative technologies and techniques in line with Mobility
Strategy objectives, improving digital accessibility and thus promoting and delivering investment in
public and private sector services.
Short
Page 48 of 126

Page 49

New
ID Action Timescale
32 Lobby for central government ring fenced funding to improve Local Bus Services and to protect
lifeline services.
Short
33 Work with bus partners to improve safety on public transport. This may include enhanced provision
of lighting and CCTV on vehicles and at key interchanges and along corridors to increase
perception of safety and encourage modal shift.
Medium
34 Explore new bus powers (Transport Act 2019) to meet the needs of residents and visitors for bus
services across the council area. The interventions may include council-run bus services,
franchised bus services or the council entering into Bus Services Improvement Partnerships
(BSIPs) with bus operators in the area. Engage with residents and visitors to better understand
where intervention is needed most.
Short
35 Encourage, support and promote Community Bus Partnerships (including the supply of bus
drivers) and transport services across Perth and Kinross to provide additional options. Services
may include dial-a-bus services, Community Bike Hubs, community minibuses and existing
schemes, such as the Glenfarg Community Transport Group.
Short
36 Improve access to bikes for everyone by exploring an e-bike share scheme by public or private
operators, or by providing support to community action groups.
Short
37 Support and encourage partners and communities to establish Car Clubs. Short
38 Support taxi and private hire fleets to decarbonise and move towards a low carbon fleet. Long
39 Continually assess air quality across Perth and Kinross to assess any necessary mitigation
measures, such as Low Emission Zones.
Short
40 Continue to encourage and promote the Council's car pool scheme as well as optimise the
service's convenience.
Short
41 Invest in a sustainable/low-carbon council fleet, including charging/fuelling infrastructure. Medium
42 Support partners in exploring hydrogen vehicles and refuelling facilities through the Tactran and
Tayside Hydrogen Project.
Medium
43 Support partners to develop and roll out Mobility-as-a-Service (MaaS). Short
44 Support bus operators to decarbonise bus services, with consideration to charging infrastructure
and fleet.
Long
45 Continue to subsidise and review Free Bus Travel schemes: 1) during the lead-up to Christmas and
2) on the first Saturday of the month during Financial Year 2024-2025, to encourage and promote
public transport.
Short
46 Support communities to develop Community Action Plans which consider transport on a local
scale, allowing for a programme of public-led and community-led projects to be adopted,
optimising opportunities from a variety of funding streams.
Short
47 Promote/support community funding opportunities that allow for local projects to be delivered by
Communities for Communities to promote and deliver investment in public and private services in
communities.
Short
48 Update the Council's Corporate Travel Plan update to align with the Mobility Strategy's vision and
objectives to promote the Council as an exemplary organisation in relation to active travel and
public transport individually as well as part of MaaS.
Short
49 Continue to support hybrid working, encouraging online video conferencing/training/meetings,
reducing the need to travel for work, and continue to provide the digital services required.
Short
50 Internally promote the Council's Low Carbon Car Scheme and Cycle to Work Scheme. Short
51 Promote Liftshare Scheme through social media and communication platforms. Short
52 Promote bus use and services through social media and council communication platforms. Short
53 Assess the feasibility of increasing freight transport by rail. Medium
Page 49 of 126

Page 50

New
ID Action Timescale
54 Provide high quality and inclusive (i.e. safe, segregated, direct) active travel infrastructure,
focusing on the delivery of active freeways between Perth City Centre / rural areas to employment,
health facilities, services, leisure and tourism activities, to encourage more people to walk, wheel
and cycle more often.
Medium
55 Implement workshops and training as well as advertisement and promotional campaigns to
increase awareness of the Avoid-Shift-Improve Framework, and subsequently increase the number
of journeys made by sustainable travel modes.
Short
56 Work with partners to improve access to healthcare and social services for those in the lowest
SIMD datazones, rural communities and over-65s through improving public transport frequency,
affordability and connectivity to healthcare facilities.
Medium
57 Provide comprehensive cycle training for vulnerable groups at all life stages in accordance with the
Council's Active Travel Strategy, including learning to ride in pre-school, learning to ride on-road
through school Bikeability training, and for adults of all ages, including cycle awareness training.
Short
58 Support the development of inter-city bus coach services supporting links to Aberdeen, Inverness,
Edinburgh & Glasgow through improved bus infrastructure and interchange facilities
Short
59 Continue to develop and implement bus priority measures to deliver bus priority on local roads.
Measures may include infrastructural improvements as well as enforcement of traffic regulations
to facilitate the provision of efficient bus service with improved journey times.
Medium
60 Explore the potential for providing further discounted travel schemes to support making travel
more affordable.
Short
61 Support provision of new, relocated and enhanced train stations where this will enhance access to
the rail network and improve integration with the area being served.
Long
62 Provide accurate and accessible travel information that is up-to-date and comprehensive
including routes, journey times, timetables, costs and facilities for all modes. Travel information
should be available in both paper-based and digital formats.
Short
63 Expand the Green Route Networks by increasing the number of shared use paths, safer crossing
locations and cycle parking. Green Route infrastructure provides walking and cycling friendly road
links on narrow country roads between communities with reduced speed limits to reduce carbon
emissions and air pollution.
Medium
64 Develop an Active Travel Monitoring Plan to collect qualitative and quantitative data on active
travel in Perth and Kinross. Monitor the outputs to evaluate the impact of active travel investment
and levels of cycling to embed learning in future decisions and schemes.
Short
65 Conduct an accessibility audit on all connections between key local services in collaboration with
the Centre for Inclusive Living. Provide improvements that meet inclusive design standards
Short
66 Introduce traffic calming measures to reduce the speeds of motorised vehicles so that residents
and visitors feel safe using the network.
Short
67 Disseminate information and maps of cycle and walking routes throughout Perth and Kinross
online and in print format. Include locations of the Green Route Network, cycle rack locations and
other active travel networks.
Short
68 Work with schools to encourage them to have up-to-date Travel Plans, and continue to provide
support to schools for implementation of the actions within them.
Short
69 Support and promote a toolkit for schools and Parent Councils to set-up and coordinate bike-
trains and walking-buses easily and effectively.
Short
70 Advertise health walks and other programmes to support people who are less confident about
walking or cycling, and work with Live Active Leisure and Sustrans to support the projects they
undertake in this area.
Short
Page 50 of 126

Page 51

New
ID Action Timescale
71 Achieve Cycle Scotland’s Cycle Friendly status as an employer, and advocate that other employers
as well as primary and secondary schools also achieve this status.
Short
72 Encourage all secondary schools to promote active travel to their pupils and expand the role of I
Bike or other similar projects, to facilitate cycling by secondary school children to and from school
as well as for leisure.
Short
73 Promote Park & Stride-sites at schools and seek to encourage parents/guardians/carers to utilise
these locations rather than parking at the school gate.
Short
74 Improve speed limit compliance and further enhancement of safety across the road network by
following the Scottish National Speed Indicator and increase the use of visual deterrents and
enforcement across the road network, particularly in areas of high deprivation and higher than
average crash casualties.
Short
75 Work with partners to undertake a Fair Fares Review (in line with National review) to ensure a
sustainable and integrated approach to public transport fares.
Short
76 Work with partners to develop smart, integrated ticketing and payment services, to modernise,
simplify and enable convenience for passengers accessing public transport. Provide alternatives
(for example, physical ticket machines) for those without digital access at key public transport
interchanges.
Medium
77 Deliver improved and safer walking, wheeling and cycling routes to primary and secondary
schools, created through a comprehensive package of behavioural change measures and local
infrastructure schemes.
Short
78 Deliver a behaviour change programme that improves access to bikes for all (including adapted
bicycles, e-cycles and cycle share) and provides schools, workplaces, communities and
disadvantaged groups with the confidence and skills to cycle, such that they can make use of new
or existing active travel infrastructure.
Short
79 Support a programme of improvements, such as junction upgrades and permissible speed
increases, to achieve journey time improvements and line capacity increases for passenger and
freight services in line with STPR2 Tay Cities recommendations and Rail Services Decarbonisation
Action Plan.
Medium
80 Provide access for all at public transport interchanges, supporting Scotland’s Accessible Travel
Framework. Roll out a programme of interchange upgrades by focussing on improved
infrastructure design to, and within bus stations, and improved information, signage and
wayfinding by upgrading the accessibility and quality of passenger facilities at existing stations and
stops or, where needed, construction of new facilities.
Medium
81 Support Transport Scotland to improve the safety and resilience of the trunk road network across
PKC (STPR2 recommendations 30-32)
Long
82 Support partners to deliver measures to reduce the adverse effects of trunk road traffic on people
walking, wheeling and cycling in those communities that have a trunk road passing through them
by, for example, reducing traffic speed, improving the width and quality of paths and upgrading
road crossing facilities.
Medium
83 Work with partners to improve vehicle accessibility and the integration of buses and trains by
increasing the space to accommodate persons with disabilities, reduced mobility, prams and/or
cycles.
Short
84 Reduce road accident casualties by delivering a range of speed management initiatives, for
example social marketing campaigns or speed awareness, to ensure that road users understand
why speed limits are set and the need to comply with them.
Short
85 Undertake a review of nature-based, green and blue infrastructure interventions which can benefit
air quality, using the outcomes to develop a database of potential solutions for both regeneration
and new developments.
Short
Page 51 of 126

Page 52

New
ID Action Timescale
86 Safeguard access rights and core paths, including active travel routes, and encourage new and
enhanced opportunities for access linking to the wider active travel network. Protect and enhance
green (land) and blue (water) infrastructure and their networks.
Short
87 Engage widely across industries to explore and create opportunities for changing technologies and
innovation, such as addressing grid capacity constraints, implementing consolidation centres and
integrating renewable energy generation, distribution and storage to reduce carbon emissions.
Medium
88 Work with regional partners to pilot integrated parking and charging payments through an
integrated mobility platform.
Short
89 Engage car club operators to address barriers to greater levels of uptake (e.g. back-to-base model,
limited information on using electric club vehicles)
Short
90 Continue to participate and support in Tactran's Regional EV Steering Group forum to share data
and learning from EV deployment to accelerate the transition and identify barriers to adoption.
Short
91 Work with partners to introduce a scheme to directly support local businesses to help them
understand and consider the financial and environmental benefits of driving an electric vehicle.
Short
92 Improve/provide active travel crossings that can accommodate cycling over the River Tay. Long
93 Review National Cycle Network (NCN) and NCN Development Plan (NDP) intersecting with Perth &
Kinross Council to explore feasibility options to connect NCN routes.
Short
94 Work with broadband providers to develop affordable, sustainable internet access, and with
partners such as social housing providers and caregivers, provide the residents with training and
support to develop basic digital skills to facilitate reduction in travel demand in relation to
employment and services.
Short
95 Grow network of Community Climate Action Hubs, supporting local communities to develop place-
based approaches to reduce emissions and become more climate resilient.
Short
96 With partners, promote the health benefits of outdoor recreation and GP-led green health referrals. Short
97 Work with regional partners to further encourage development and employee use of Green Travel
Plans in large workplaces.
Short
98 Keep the City Centre Traffic Management Review under continual review. The Council's Traffic and
Environmental Teams will liaise regularly to discuss the effects of component measures of the
CCTMR on air quality.
Short
99 Assess the potential options for smart parking to facilitate effective location of available parking
spaces, and in doing so, reduce adverse impacts on congestion and air quality.
Short
100 Establish Tayside Physical Activity and Green Health Network with partners to develop pathways to
support people to be active in their own community.
Short
101 Provide access for everyone to activities prescribed by social prescribers and link social
prescribers to GP practices.
Medium
102 Develop pocket places in key areas with cycle infrastructure and maps / area information, and
public transport timetables.
Short
103 Explore potential for parking areas outwith town centres across Perth and Kinross, including Park-
and-Ride / Park-and-Choose.
Short
104 Improve connections between village/town centres and greenspaces to encourage locally made
active travel trips for the benefit of recreation, health and wellbeing and local economy.
Medium
105 Work with bus service providers to provide hopper bus services around towns and settlements to
increase direct connectivity to key amenities and services.
Short
106 Improve access for emergency healthcare in rural areas where there is concern for the journey
time for ambulances and the lack of doctors in the area.
Short
Page 52 of 126

Page 53

New
ID Action Timescale
107 Explore feasibility to pedestrianise village, town and city centres on a permanent/seasonal basis to
create more liveable and accessible centres for both residents and visitors, and to boost local
economy.
Short
108 Expand pavements to the houses on the edges of rural villages and towns. Long
109 Work with Tactran's Regional Freight Quality Partnership to develop a Freight, Logistics and
Deliveries Plan to ensure that logistics and distribution networks move goods efficiently and
sustainably to businesses and consumers. This may include, for instance, exploring the role of
consolidation centres along the strategic road corridors.
Short
110 Develop a Public Transport Strategy to guide the development of the public transport system
across the region for the benefit of those visiting, working and living in Perth and Kinross.
Short
111 Conduct a traffic safety audit on all major roads and across all settlements larger than 1,000
residents, within 5km of schools. Carry out improvements based on findings.
Medium
112 Explore potential of removing, reducing, reallocating on- and off-street parking across Perth and
Kinross to create space for sustainable and active travel and public realm.
Short
113 Conduct a review of signage in relation to existing active travel routes (e.g. NCN, core paths) and
signposting to key amenities/ services/ attractions/ gateways.
Short
114 Explore the feasibility and identify appropriate locations for implementing Cycle Streets (i.e.
prioritisation of cycle users within a mixed street environment with motor traffic to be treated as
‘guests’) and/or Filtered Streets (i.e. filtered access for motor traffic while delivering permeable
access for walking, wheeling and cycling) to encourage active travel.
Short
115 Explore the feasibility and support delivery of expanding the network of long-distance off-road
shared paths for commuting and recreational travel. This may include the review of, for example,
Countryside Trust's active travel projects and re-utilisation of disused railway lines for walking,
wheeling and cycling, particularly between rural settlements.
Short
116 Work with communities to provide support in the process for applying for an under-22's bus pass. Short
117 Review the pricing of parking across Perth and Kinross. Short
118 Develop and deliver a seasonal Maintenance Plan for active travel facilities to clear them of
overgrown vegetation, fallen leaves, snow and ice.
Short
119 Together with partners, explore the feasibility of providing secure off-street cycle parking at public
transport stops and stations. Secure cycle parking should accommodate various cycles, such as
cargobikes, tricycles, wide-tyred cycles, cycles with trailers in addition to providing facilities for
storing accessories, such as saddlebags and helmets during the duration of parking to encourage
linked trips by active modes.
Short
120 Work with public transport providers to improve the experience within railway and bus stations, by
providing free facilities such as adequate seating, well maintained toilets, water refill stations and
fast Wi-Fi
Short
121 Work with operators to provide on board audio-visual facilities on buses (including naming and
announcement of bus stops) to improve accessibility for older people and people with visual or
hearing impairments.
Short
122 Work with partners to improve the viability of choosing to travel by bus, particularly in rural areas.
The improvements may be in relation to reliability and frequency of bus services.
Medium
123 Continue to monitor and model traffic flows across Perth City to understand the impacts of new
developments and traffic management alterations on air quality, and look for opportunities to align
with the regional model.
Short
124 Following the completion of Perth Transport Futures Phase 1 in 2019, complete phase 2 (‘Destiny
Bridge’ and accompanying infrastructure) and phase 3 (Bertha Park North Link).
Short
Page 53 of 126

Page 54

New
ID Action Timescale
125 Ensure the continued operation of the public transport system to meet the needs of the residents
and visitors across Perth and Kinross.
Short
126 Make improvements within town and village centres to reduce car dominance and improving
sustainable and active travel choices. Improvements may consider: parking and road space
reallocation, traffic management arrangements, connecting services, and placemaking to
optimise traffic flows and the space available, and improving sustainable and active travel choices
to reduce congestion and local emissions.
Medium
Page 54 of 126

Page 55

Perth Transport Futures City Centre Engagement Plan
What is Perth Transport Futures City Centre Plan?
Perth Transport Futures is a major infrastructure upgrade programme to improve the road
network around Perth City. It is being delivered in four phases and includes the
construction of the Destiny Bridge and Kingsway (Cross Tay Link Road). 
The final phase is a package of city centre improvements to improve the public realm and
access for sustainable modes of transport. Perth Transport Futures City Centre Plan is
being developed to determine the optimal way to reallocate space to achieve this,
maintaining traffic flow around the city centre and access by car, while discouraging
people from using it as a through route. 
To date, a conceptual plan has been developed showing that the proposals are broadly
feasible. Engagement is now required to refine it, add in detail and create a deliverable
proposal that meets our policy objectives and the needs of residents, businesses, and
visitors.
Why are we developing Perth Transport Futures City Centre Plan?
Perth Transport Futures is a major infrastructure upgrade programme to improve the road
network around the city, which aims to address the long-term transportation needs of the
area, promote economic growth and reduce congestion and pollution within the city
centre, in order to make it a more attractive and welcoming environment. 
The expected reduction in city centre traffic following the opening of the Cross Tay Link
Road in March 2025 created the opportunity to reallocate road space to make city centre
improvements (e.g. widening pavements and increasing greenery) without significant
negative traffic impacts.
However, city centre traffic reductions will not last indefinitely. This is because in areas
of high travel demand, traffic volumes usually increase over time to fill available road
space. Hence there is a degree of urgency to begin implementing the Perth Transport
Futures City Centre Plan before traffic volumes and congestion return, that may be
difficult to reverse.
The plan will be developed to address existing problems in the city centre including:
• Air pollution (clear evidence)
• Congestion
• Harm caused by road traffic collisions
• Poor quality pedestrian environment, including poor access for people with
disabilities
• Lack of a safe cycle network
Appendix D 4
Page 55 of 126

Page 56

• Car dominated streets, making the city centre less pleasant to move around and
spend time in  
• Lack of transport choice
The plan will allow creation of a more inclusive, people-friendly city centre that supports
a more thriving economy and community life. This will also help us address climate
change and meet our net-zero targets. 
Key principles
• Reduce traffic passing through the city centre
• Maintain access to residences, businesses and car parking by car
• Reallocate road space to sustainable transport modes (walking, wheeling, cycling
& buses)
• No net detriment to accessible parking spaces
• Enhance the public realm
• Embed climate resilience and help tackle the nature emergency through
measures such as sustainable drainage and planting 
Intended outcomes for the city centre
• A more attractive place to live and visit
• Improved traffic flow around the city centre and through key junctions
• Improved bus journey times and reliability
• Reduced traffic-related casualties
• Improved accessibility 
• Creation of a safe network of cycle routes
• Improved air quality 
Purpose of planned engagement
• Inform people what Perth Transport Futures City Centre Plan is and why it is being
proposed
• Consult on the level of support for:
o key principles underpinning the Circulation Plan
o trade-offs that will be required to implement it
• Define operational requirements of stakeholders
• Co-ordinate delivery requirements across a range of Council Departments 
Page 56 of 126

Page 57

The engagement plan will be developed in line with best practice outlined in the National
Standards for Community Engagement.
Who are the audiences?
• Perth City residents
• Perth City visitors (PKC residents who work in or visit the city centre, tourists from
outside PKC)
• Businesses (engage via existing channels via Economic Development)
• Other stakeholders (e.g. bus operators, taxi association, Centre for Inclusive
Living, cycling groups, Live Active Group, NFU, freight operators) 
Potential engagement methods
• pre-release with Ward / All Members to refine the engagement plan
• Online survey
• Market research to fill gaps in online survey respondent profile and ensure survey
is representative of the PKC population
• Focus groups of seldom heard and underrepresented groups (e.g. young people)
• Stakeholder workshops 
Timelines
o 12 months of engagement
o First 6 months engagement on key principles and trade-offs, stakeholder
requirements
o Second 6 months likely look at more detailed examples such as concept design for
South St. Potentially looking towards Perth Bridges maintenance and the trial PTF city
centre measures 
Potential Survey questions
The following questions are based on engagement on a similar project by City of
Edinburgh Council
Personal details
• personal details (age, gender, home postcode, disability)
• methods of travel used
Principles & trade-offs
Page 57 of 126

Page 58

• To what extent do you agree or disagree with reducing traffic passing through the city
centre (within the inner ring road) so that we can deliver a friendlier environment for
people living and spending time in, shopping, working and visiting Perth?
• Which streets should be prioritised for reducing through traffic? [map-based, drop up
to 3 pins on the streets of their choice]
• To what extent do you agree or disagree with making junctions and crossings easier
and safer to walk or wheel across, even where this may result in impacts to other ways
of travelling?
• To what extent do you agree or disagree with taking action to protect vulnerable road
users at major junctions which may impact motorised traffic?
• To what extent do you agree or disagree with creating a cycle network in the city centre
with routes separated from both traffic and pedestrians, so that people can safely
access the city centre by cycle?
• To what extent do you agree or disagree with reducing kerbside parking within the city
centre and using the space to improve the public realm, such as providing more
greenery and seating, while still providing essential access for deliveries and people
with mobility difficulties?
• To what extent do you agree or disagree with reducing kerbside parking to provide
more space for everyone to walk, wheel, cycle and move around the city centre on
public transport?
• To what extent do you agree with implementing bus priority or cycle lanes on key
corridors if it makes journey times longer for car drivers? 
• To what extent do you agree or disagree with taking action to improve women’s safety
through improving lighting and creating safe cycle routes? 
Background / key findings from relevant recent consultations to inform engagement
Big Place Conversation
Key points about Perth City from residents of Perth City wards (374 responses) plus
findings from engagement with specific demographics / protected groups across PKC:
• Accessibility to city centre a concern for people living outwith the centre
• Lack of segregated cycle routes on main roads, particularly highlighted by women
• Concerns on pavement quality – particularly elderly/disabled (uneven surface,
missing dropped kerbs, pedestrian priority crossings and street clutter)
• Access to city by public transport from surrounding neighbourhoods is a concern
• Insufficient evening and weekend services, reduces viability of city centre
businesses
• Frustration that some rail/bus interchange requires walk to Mill St
• Some perceptions parking is insufficient and not affordable
Page 58 of 126

Page 59

• Concern over neglect of important streets and buildings
• Concern about overall attractiveness of city 
• More biodiversity within open spaces (particularly from young people) and more
nature on streets is sought
• Make more of River Tay and better walkways generally
• Improve Lade path
• Significant concerns at night and anti-social behaviour
• Better lighting and more CCTV needed is some areas
• Drainage and flood protection sought
Key points on engagement methods
• PKC equalities unit are great and make effort to listen & take action
• Children and young people suggest
o Improved use of social media
o Shorter surveys
• They are concerned about lack of engagement with them,  ‘it will be our future’
• Older people cite they communicate with Community Councils but have difficulty
communicating with the Council
• People identifying as LGBTI often don’t feel listened to or feel ignored, but the
Council equalities team is great
• People from Ethnic Minorities do not feel they have influence beyond their group 
City Development and Design Framework (542 responses)
The City Development and Design Framework consulted on level of support for a range of
potential city centre projects, including place-based improvements. 
Ten statements asked about proposals that include increasing greenery without obvious
trade-offs in terms of reducing space for traffic and car parking. For all 10, most people
either agreed or strongly agreed with the statement.
Four statements asked about proposals that seek to increase greenery in the city centre
with obvious trade-offs in terms of reducing space for traffic and car parking. For three of
these proposals, most people did not agree/strongly with the statement.
Least agreement when replacing a car park with greenspace:
• Scott St car park, new green space with trees and planting = 34%
• Station car park to greenspace & public realm = 25%
Part pedestrianisation
Page 59 of 126

Page 60

• Green corridor and part pedestrianisation of route towards city mills/culture
quarter = 49%
Parking and street space to greenspace
• Turn some parking areas and streets [on route between station & city centre] into
usable green spaces = 53%
Perth Walking and Cycling Index 2025 (representative residents survey of the greater
Perth area)
• 65% of people support building more cycle paths physically separated from traffic
and pedestrians, even when this would mean less room for other road traffic
• 64% support reducing speed limits on local roads in built up areas to 20 mph
speed limits
• 76% support improving walking, wheeling and cycling access to bus stops and
coach or rail stations
• Strong support (>71%) for changes that would help people to walk more, including
wider pavements, more crossing points with reduced wait times and nicer places
to stop and rest, e.g. more benches, trees and shelters.
• Percentage of residents who would like to use different types of transport more in
the future
o Walk / wheel 44%
o Cycle 45%
o Take public transport 34%
o Drive 13%
• 25% of residents would like to drive less in the future 
Page 60 of 126

Page 61

List of Policy Statements 
ID Policy
POL1 Build developments where all essentials (shops, schools, parks) are close by and easily
accessible by sustainable modes of transport to reduce the need to travel and minimise the
use of unsustainable modes. Interventions will be assessed through the development
management process and need to be proportionate to the size and location of the
development.
POL2 For developments creating significant number of new trips with no public transport services
available, enforce that the developer provides a subsidised service until passenger numbers
become commercially viable.
POL3 Work with operators and developers to ensure that existing and new employment,
education, retail, healthcare, and tourism destinations are serviced by road-based
passenger transport, particularly in rural areas.
POL4 Ensure that land identified as having potential for Park & Ride development is safeguarded
within the appropriate Development Plan(s).
POL5 Deliver connected neighbourhoods within towns and cities to better achieve connected and
more accessible communities following the 20-minute neighbourhood concept, so that as
many people as possible can meet the majority of their daily needs within a reasonable walk,
wheel or cycle of their home.
POL6 Encourage, promote and facilitate spaces and opportunities for play, recreation and sport
that are inclusive and enable children and young people to play and move around safely and
independently, maximising opportunities for informal and incidental play.
POL7 Ensure that retail development and the location of shops can be accessed by communities
by a range of sustainable transport modes including on foot, by bike, and by public transport.
POL8 Explore the provision of electric car club vehicles (and associated charging infrastructure)
as part of new housing developments.
POL9 Enable inclusion of an electric car sharing vehicle at the site of any significant charging
infrastructure.
POL10 Ensure new / improved infrastructure avoids increasing flood risk and reduces risk of
flooding. 
POL11 Continue to work with local communities, key stakeholders and resilience groups in the co-
design of projects to build better places together, while seeking to expand the range and
number of opportunities for co-design by making use of external funding sources.
POL12 Integrate sustainable urban drainage systems in design and placemaking to reduce surface
water flooding/run-off.
Appendix E
4
Page 61 of 126

Page 62

POL13 Ensure developments consider place and prioritise the needs of people before the
movement of motor vehicles in line with national and local design guidance. This includes
prioritising sustainable and active travel choices, and including fully accessible paths and
routes which are well connected with the wider environment beyond the site boundary.
POL14 Ensure developments consider the impact on the path network and be consistent with the
Scottish Outdoor Access Code.
POL15 Work with land managers to ensure existing woodlands are managed and enhanced for a
range of benefits, including public access and biodiversity.
POL16 Develop a rural approach/equivalent to the 20-minute neighbourhood concept in and
around villages and towns to enhance local accessibility, help tackle societal causes of
inequality, and reduce social isolation and loneliness.
POL17 Protect and incorporate green infrastructure within all new infrastructure schemes and
developments, capitalising on opportunities across Perth and Kinross to promote active
travel and make connections where possible to blue and green networks to provide a
multifunctional network with multiple benefits for climate and nature. 
POL18 Integrate art and design within projects to encourage active travel and enhance public realm
by, for example, exploring ways to incorporate it into empty spaces, into
navigation/wayfinding, and at public transport interchanges.
POL19 Ensure that the access of agricultural traffic is duly considered in infrastructure projects.
POL20 Continue to ensure that, at minimum, the designs for transport developments meet
standards and the National Roads Development Guide (NRDG). 
Page 62 of 126

Page 63

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Climate Change & Sustainability 
Date of Meeting:  27 May 2026 
Report Title: Green Living Fund – Round 3 
Report Number: 26/145 
Report Author: Eirini Kourtesi, Team Leader – Climate Change &
Sustainable Development 
Organisational Lead:  Fraser Crofts, Strategic Lead – Environment &
Infrastructure
___________________________________________________________________
1. Purpose 
1.1 The purpose of this Report is to provide members of the CC&S Committee
with the proposed approach for delivery of Round 3 of the Green Living Fund
(GLF) for review and approval. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the lessons presented from Round 2 of the Green Living Fund. 
2.2 Approves the approach to Round 3 of the Green Living Fund as outlined in
Section 5. 
5
Page 63 of 126

Page 64

2.3 Approves advanced payments to be made to successful groups as part of the
grant award process.
2.4  Approves combining the funds available to Perth City South, North, and
Centre wards into one pot. 
2.5  Approves any potential underspend to be utilised for awards across all Wards
at the Officers’ discretion, upon communication with the CC&S Convener and
Vice Convener.
3. Background/Context 
3.1  The Green Living Fund (GLF) has been designed to provide support to
community groups with projects that help address both the cost of living and
climate crises. The GLF approach has been developed in line with the
Council’s climate change strategy objectives by enabling projects that will
impact on reducing emissions, building a more resilient Perth and Kinross,
supporting those who are more vulnerable to climate change and its impacts,
and protecting biodiversity. Applications to the GLF are carefully reviewed by
an expert panel to ensure projects meet the eligibility criteria and support the
Council’s wider climate change objectives. 
3.2 The GLF uses a participatory budgeting approach to build community buy-in
and deliver local priorities. The Council provided funding for Round 1, which
opened for applications in October 2023, with £215,386 in funds awarded to
38 groups as voted on by their communities. These 38 projects were selected
by over 2,000 voters. 
3.3 Round 2 of the GLF was approved in August 2025, with £200,000 split across
the twelve Perth and Kinross Wards. Out of the total fund allocation,
£148,759.74 in funds were awarded to 28 groups due to some wards being
undersubscribed which resulted to an underspend of £51,240. Round 2 of the
GLF ran in parallel with the Fairer Communities For All fund (FCFA) using a
joint online voting system that was accessed by 6998 voters from across
Perth and Kinross. Using a joint system increased efficiencies for Officers and
offered the opportunity for proposals to be transferred between the two funds
as appropriate. One proposal was successfully transferred from FCFA to GLF
due the project scope aligning with the objectives of the GLF. 
3.4 GLF projects align with the following themes, and must also demonstrate how
they will help local residents with the cost of living. These are linked to the
Council’s climate change priorities, supporting the delivery of climate action
across Perth and Kinross. 
• Energy – reducing consumption, promoting efficiency, generating
renewable energy
• Transport – encouraging active travel, decarbonising transport
• Waste – reduce, reuse, repurpose and recycle
• Resilience – adapting to changing conditions – including flooding,
drought and heat
Page 64 of 126

Page 65

• Nature – improving greenspace, increasing biodiversity, local food
growing
• Engagement – increasing public awareness and engaging communities 
3.5 Successful proposals from Round 2 included a variety of proposals that
aligned with the themes above. Some examples include a food growing
allotment at Perth UHI, free bike packages from Crieff Cycle Charity, litter
picks and surplus food pick-ups from Kinross-shire Youth Enterprise.
Additionally, digital foodbank vouchers from Broke not Broken and repair
festivals from Remake Scotland and Greener Kinross-shire, as well as energy
efficiency improvements from Blairgowrie Rugby Club, Perth Autism Support
and Glenfarg Community Centre, are some examples of the projects that
came into fruition as a result of GLF Round 2. Round 2 projects are currently
being implemented, and the grant funds must be spent by 31 December 2026.
A briefing note outlining detailed information and impact of projects will be
issued to Members following completion of Round 2 projects. 
3.6 Members allocated £200,000 of funding for GLF – Round 3 as part of the
budget setting process for 2026/27 (Report 26/54 refers).
4. Main Issues 
4.1 The decision to use Microsoft Forms (MS Forms) as the online voting platform
was approved for Round 2 (Report 25/203  refers) with the intention to
remove accessibility barriers for young people that had previously been an
issue when using the CONSUL platform. Using MS Forms was largely a
positive experience for the majority of voters, especially since they could vote
for both GLF and FCFA projects using one platform. However, a small
number of residents raised some concerns about the accessibility of the
voting form, mainly, around the lack of digital skills in areas with ageing
population. It is worth noting that facilities had been put in place to provide
supported access in libraries. 
4.2 Cross-ward projects - during Round 2, the fund received a number of
proposals for cross-ward projects. Applicants were advised to split their
application according to the funding required per ward so that their
applications were deemed specific to each ward. However, this was not
possible for all cross-ward proposals due to the nature of the project and time
limitations for the proposals to be submitted e.g. an organisation providing
support to groups throughout Perth and Kinross. These proposals were
therefore submitted within the ward the group is based on, but further
guidance on cross-ward proposals would be welcomed by applicants. 
4.3 Undersubscribed wards - certain wards were undersubscribed due to a small
number of proposals applying to the GLF for Round 2. To ensure that
proposals would only go forward if they had the support of the local
community (in line with the participatory budgeting objectives), a decision was
made to introduce an additional requirement for a minimum of 50 votes in
undersubscribed wards. 
Page 65 of 126

Page 66

This approach aligned with the FCFA eligibility criteria but had to be made
during the voting process as it had not been included in the original approach
proposed for GLF Round 2. Due to lack of applications in some wards there
was an underspend of £51,240 at the end of the application window which
was carried forward to Round 3. 
5 Proposals 
5.1 It is proposed to continue to run the GLF following the same approach used in
Round 2 with no major modifications, using Microsoft Forms as the voting
platform. Supported access in libraries will also be provided for Round 3 to
minimise any access issues for those with limited internet connection or lack
of digital skills. Postal votes will also be accepted upon request in cases
where supported access is not available, eliminating any potential barriers to
vote due to the above. 
5.2  It is proposed to disburse the funds to successful applicants as an advance
payment, within the proposed timeline at 5.10, and upon receipt of the
awardee’s signed acceptance form.   Advance payment will be on the basis
that the awardee commits to specific financial governance conditions,
including but not limited to, keeping full written records of what the agreed
funding is spent on and retaining original receipts/invoices as proof of
expenditure, to be provided to the Council along with their monitoring form. 
5.3 The FCFA has been rebranded as the Investment in Communities Fund and it
has been allocated £350,000 of funding for 2026/27 (Report 26/54 refers). At
this current time, the plan for delivery of the Investment in Communities Fund
has not been agreed by Housing & Social Wellbeing Committee. Once this
has been agreed we will seek to work in tandem with that fund to avoid
duplication of voting processes. Should the timeline allow, it is proposed that
the GLF will run in parallel with the Investment in Communities Fund to
maximise efficiencies in terms of the voting process. 
5.4 Similar to Round 2, proposals will be evaluated 50% on technical evaluation
by PKC Officers and 50% on community voting. The PKC Officer scoring will
be based on the following criteria: 
• Expected climate change impact – 30%
• Expected cost of living impact – 30% 
• Wider community benefits – 20% 
• Value for Money – 20% 
5.5 No modifications are proposed to the evaluation process, and the same
approach is proposed for Round 3. 
Page 66 of 126

Page 67

5.6  In line with GLF Round 2 Report approved at Committee (Report 25/203
refers), Round 2 awardees must complete a monitoring form (Appendix  A) by
31  December 2026 which will outline information on: 
• How the funds were spent including receipts and invoices
• Community impact (how many people benefitted from the project,
volunteers involved)
• Climate change impact (taking climate action locally, emissions
reduction)
• Cost-of-living impact (people supported in the community with the cost-
of-living e.g. items provided free of charge) 
5.7 The monitoring form will allow officers to estimate the real impact on carbon 
emissions by looking at emissions savings in relation to each project.  No 
modifications are proposed to the monitoring process, and the same approach 
is proposed for Round 3. 
5.7 Funding Allocation – There is a total funding allocation of £251,240 for GLF
Round 3. This consists of the £200,000 allocation for 2026/27 (Report 26/54
refers), plus the £51,240 underspend from Round 2 which Elected Members
approved to  roll over to 2026/27. It is proposed that 50% of the funding will be
allocated equally to each ward and 50% of the funding will be allocated based
on the population of the ward. Due to a statistical margin error in the 2022
Census population data, the total funding available would exceed the
available funding if the above methodology was followed strictly. For this
reason, the equal split per ward has been rounded down to the closest penny,
allowing for an underspend of £2.34. This pot can be used to round up partial
awards to the closest penny on occasions where the ward allocation has been
reached. Furthermore, reflecting on the lessons learnt from Round 2 of the
GLF, the funding available for the three Perth City wards (Centre, South, and
North) has been combined. This seeks to minimise any underspend across all
City wards based on the experience of submissions in Round 2. 
The proposed allocation is  shown in Table 1.  
Page 67 of 126

Page 68

Table 1 
Ward
Population
(Census
2022) Equal Split
Per Capita
allocation
Total
funding
1- Carse of
Gowrie 9916 £10,468.00 £8,251.89 £18,719.89
2 - Strathmore 15,458 £10,468.00 £12,863.83 £23,331.83
3 - Blairgowrie &
Glens 11,248 £10,468.00 £9,360.36 £19,828.36
4 - Highland 8927 £10,468.00 £7,428.87 £17,896.87
5 - Strathtay 12,302 £10,468.00 £10,237.47 £20,705.47
6 - Strathearn 10,419 £10,468.00 £8,670.48 £19,138.48
7- Strathallan 11,727 £10,468.00 £9,758.97 £20,226.97
8- Kinross-shire 14,119 £10,468.00 £11,749.54 £22,217.54
9 - Almond &
Earn 10,162 £10,468.00 £8,456.61 £18,924.61
10, 11, 12 –
Perth City
South, North,
Centre 46,677 £31,404.00 £38,843.64 £70,247.64
Totals 150,953 £125,616.00 £125,620.00 £251,237.66 
5.8  Cross-ward projects – to ensure the GLF application process is fair and
transparent, it is proposed that cross-ward project proposals should be
submitted as multiple applications. These should be specific to each ward,
clarifying the funding requested for each. Groups may therefore submit copies
of the same application, simply changing the funding requested per ward. 
5.9 Undersubscribed wards – to ensure successful projects have the support of
the local community, it is proposed to introduce the requirement for a
minimum of 50 votes for all projects. To try and avoid any underspend in
Round 3, and most importantly to ensure that more high-scoring and impactful
projects are supported, it is also proposed to allow for any potential
underspend to be used at the officers’ discretion in line with the scoring
methodology after communicating with the Climate Change and Sustainability
Committee Convener and Vice-Convener. 
5.10  Timeline – the proposed timeline for the GLF Round 3 Application process is: 
• 24 August 2026 – Call for applications opens
• 5 October 2026 – Submission for applications closes
• 5 October – 26 October 2026 – Screening of applications by Council
• 26 October – 23 November 2026 – Voting Open
• 23 November – 30 November 2026 – Final screening
• Results announced by 4 December 2026
• Target date for disbursing funds to successful applicants by 18 December
2026 
Page 68 of 126

Page 69

5.11 Please note the timeline outlined above is indicative for the purposes of this
report. It is subject to change according to the timeline for the Investing in
Communities Fund if it is deemed appropriate to run the two funds in parallel,
similar to 2025.
6 Conclusion 
6.1 Since its introduction in October 2023 the Green Living Fund has helped 66
community organisations shape and deliver impactful changes locally.
Lessons were learned from Rounds 1 and 2 and other participatory budgeting
approaches that have been incorporated into the proposed approach for
Round 3. These should help to further increase the accessibility, engagement
and impact of this funding.
7. Impact Value Assessment 
Green_Living_Fund_-_Round_3.pdf
8. Appendices 
8.1 Appendix A – Green Living Fund Monitoring Form 
Page 69 of 126

Page 70

Page 70 of 126

Page 71

Appendix A
Green Living Fund Monitoring Form 2025/26 
Should you require a copy of your original application to the Green Living Fund please
contact climatechange@pkc.gov.uk
Privacy Notice
The information provided by you will be used by Perth and Kinross Council to monitor
and evaluate your involvement in the Green Living Fund. 
The information will not be disclosed to third parties except as described below. The
Council may check information provided by you, or information about you provided by a
third party, with other information held by us. We may also get information from certain
third parties or share your information with them in order to verify its accuracy, prevent
or detect crime, protect public funds or where required by law. For further information,
please look at our website www.pkc.gov.uk/dataprotection,
email DataProtection@pkc.gov.uk or telephone 01738 477933. 
If you or someone you know would like a copy of this document in another language or
format, (on occasion, only a summary of the document will be provided in translation),
this can be arranged by contacting the Customer Service Centre on 01738 475000. You
can also send us a text message on 07824 498145. All Council Services can offer a
telephone translation facility. BSL users can contact us via Contact Scotland BSL, the
online British Sign Language video relay interpreting service. Find out more on the
Contact Scotland BSL website https://contactscotland-bsl.org
When you submit this form, it will not automatically collect your details like name and
email address unless you provide them yourself
1. Group name
2. Project name
3. Amount awarded (£)
4. Has your project been delayed or been changed since your award was made?
Yes/No
5. Date of project completion (for on-going projects, date grant funded element
was completed) 
Spending your Grant
6. Have you spent the full amount awarded by the grant on relevant project
expenses in line with your application? Yes/No
7. Please list each cost category you have used the award for. E.g. Bus trip x15 -
£40; Snacks x15 – £30 etc.
5
Page 71 of 126

Page 72

8. Are there any costs you are unable to provide receipts for?  If so, please explain
the reason and value of these costs
9. Are these costs different from what was stated in your application? If yes, explain
these changes. 
10.  Did your project receive additional funding? Please provide the details of the
other funding you secured for your project in the following format: 
Funding source – Value of Funding
Benefits of the Grant
11.  In your application, you indicated that your project would work towards the
Green Living Fund priorities identified below:
Energy – e.g. reducing consumption, promoting efficiency, generating renewable
energy 
Transport – e.g. encouraging active travel, decarbonising transport
Waste – e.g. reducing, reusing, repurposing and recycling
Resilience – e.g. adapting to changing conditions – including flooding, drought
and heat
Nature – e.g. improving greenspace, increasing biodiversity, local food growing
Engagement – e.g. increasing public awareness and engaging communities  
Please detail how your project has impacted on each relevant priority.
Please note: Only respond to the question by making reference to the priority (or
priorities)  that you initially selected in your application, you do not need to
provide an answer for each priority listed. 
12.  How many people have benefitted from your project?
13.  How many volunteers helped to deliver your project?
14.  Have there been any changes to this information since your application? If yes,
explain these changes.
15.  Please give details of the ways in which the grant has been of benefit to people
in your community, or groups you are working with.
Climate Change Impact
16.  What impact did your project have on taking climate action in your area? Please
provide as much detail as possible including quantitative figures if available.
Please see quantitative examples for each of the fund categories below that can
be used to estimate respective emissions savings:
- Energy: kWh saved as a result of a retrofitting project 
- Transport:  personal vehicle miles reduced by using a community transport
scheme or active travel
- Waste: kilograms of waste diverted away from landfill
Page 72 of 126

Page 73

- Resilience: number of people engaged in the local community  prior to a
severe weather event
- Nature: kilograms of produce from a food growing allotment, number of trees
planted
- Engagement: number of people attending workshops/events
The Climate Change and Sustainable Development Team are available to provide
support in completing this section. Indicators according to the scope of each
project can be set at an early stage during the project delivery in order to compile
relevant information for completing this monitoring form. Please contact the team
via email (climatechange@pkc.gov.uk) to discuss your project and identify suitable
indicators.
Cost of Living Impact
17.  What impact did your project have on supporting people in your community with the
cost-of-living? Please provide as much detail as possible including quantitative
figures if available e.g. value of items/services provided to residents free of charge,
or number of people engaged with in repair workshops. 
Declaration
By providing your details below, you agree to the following statements:
1. I confirm that the details contained in this form are correct and that we will keep
all financial records and accounts for at least six years from payment of the
grant. 
2. We understand that this does not release us from any legal responsibility to keep
records for longer periods. 
3. Copies of the the relevant invoices/receipts will be provided to Perth and Kinross
Council.
18.  I confirm that we have forwarded copies of the relevant invoices/receipts to
climatechange@pkc.gov.uk as well as photos of the completed project (if
relevant). 
Name
Project Role
Date 
Page 73 of 126

Page 74

Page 74 of 126

Page 75

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board:  Climate Change & Sustainability 
Date of Meeting: 27 May 2026 
Report Title: Perth Surface Water Management Plan 
Report Number: 26/146 
Report Author: Gavin Bissett, Engineer, Flooding Team 
Organisational Lead: Fraser Crofts, Strategic Lead – Environment and
Infrastructure
___________________________________________________________________
1. Purpose 
1.1 The purpose of this Report is to summarise the findings and outcomes of the
Council’s ‘Perth Surface Water Management Plan (SWMP)'. The report
highlights that no viable surface water flood protection schemes have been
identified but makes recommendations on other measures that should be
taken forward where opportunities for collaboration with other projects exist.   
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the completion of the Perth SWMP as required by the Tay Flood Risk
Management Plan and Local Flood Risk Management Plan. 
6
Page 75 of 126

Page 76

2.2 Approves the recommendations of the Perth Surface Water Management
Plan, which state that whilst no viable surface water flood protection schemes
have been identified, some measures have been found that should be taken
forward where opportunities for collaboration with other projects exist. This
also includes emphasising, and where possible, supporting the uptake of
property flood resilience measures. 
2.3 Notes that public engagement has been undertaken to disseminate the
findings of the SWMP. 
2.4 Notes the requirement to monitor, review and update the Perth SWMP in
Cycle 3 (2028-2034). 
3. Background/Context 
3.1  Under the Flood Risk Management (Scotland) Act 2009, SEPA and lead local
authorities published their Cycle 1 Flood Risk Management (FRM) Strategies
and Local FRM Plans in December 2015 and June 2016 respectively. These
documents set out a range of actions that SEPA and responsible authorities
took to manage and, where possible, reduce the risk of flooding over a six-
year period. 
3.2 The (then) Environment Committee approved the content and publication of
the Cycle 1 Tay Local FRM Plan on 1 June 2016 (Report 16/241 refers). The
(then) Environment and Infrastructure Committee subsequently approved the
content of an Interim Report on the progress made in implementing the Cycle
1 Local FRM Plans on 23 January 2019 (Report 19/16 refers). 
3.3 SEPA and lead local authorities published updated Cycle 2 FRM Plans and
Local FRM Plans in December 2021 and December 2022 respectively for the
six-year period from 2022 to 2028. The Climate Change & Sustainability
Committee approved the content and publication of the Cycle 1 Final Report
and Cycle 2 Tay Local FRM Plan on 19 December 2022 (Report 22/307
refers). The Climate Change & Sustainability Committee subsequently
approved the content of an Interim Report on the progress made in
implementing the Cycle 2 Local FRM Plans on 10 November 2025 (Report
25/300 refers).  The published documents can be viewed at the following link:
http://www.pkc.gov.uk/frmplans 
3.4 The published FRM Plans and Local FRM Plans identify various flood studies
as a means of further improving the understanding of flood risk in certain
locations. The plans identified a Surface Water Management Plan (SWMP) for
Perth. The purpose of this study was to build on the significant level of
previous investigations regarding surface water flood risk in Perth, and to
explore what further action would be required to manage surface water flood
risk in Perth and set this out in a plan. Actions could then be identified and
assessed against technical, economic and acceptability factors to determine
feasibility. Any feasible actions could then be implemented as part of a flood
protection scheme.
Page 76 of 126

Page 77

3.5 The 2009 Act provides local authorities with discretionary powers to promote
flood protection schemes. Only those flood schemes which have been
included in the published FRM Plans, the Local FRM Plans and the national
priority list are taken forward in the subsequent 6-year period. 
3.6  Although public authorities are expected to take a proactive role in managing
and, where achievable, lowering flood risk, the primary responsibility for
avoiding or managing flood risk still remains with land and property owners.
The 2009 Act does not alter this. Individuals, businesses and communities
must, therefore, play a critical role in making themselves more resilient and
helping to reduce the impact of flooding.
4. Main Issues 
4.1 Perth is located in the River Tay catchment within Potentially Vulnerable Area
(PVA) 02/08/12. 
4.2 The primary sources of potential flooding in Perth are from fluvial (river) and
pluvial (surface water) flooding. Fluvial flooding was mitigated through the
construction of the Perth Flood Prevention Scheme (PFPS) in 2001 to
primarily protect areas of Perth from the River Tay, Perth Town Lade and
River Almond. The PFPS was considered, at that time, to have a 1 in 250-
year standard of protection. The PFPS also includes flood protection
measures at Almondbank, Craige Burn, three flood storage ponds at Broxden,
and two reservoirs located at South Inch Park and North Muirton. 
4.3 The term surface water flooding is often used to describe the complex
interaction of many sources of flooding as a result of rainfall run-off flowing
overland, exceedance of small urban watercourses (including culverted
watercourses) or artificial drainage systems (e.g. combined sewer), and
groundwater. 
4.4 In December 2021, consultant engineers, Amey Consulting Ltd were engaged
to carry out a SWMP for Perth. 
4.5 Amey’s investigations involved extensive data gathering and analysis,
consultations, topographic surveys, a hydrological assessment, hydraulic
modelling, an environmental desk study, an options study, an economic
appraisal and the production of final reports.
4.6 This work built on the numerous existing investigations into surface water
flood risk across Perth. This included the Perth Integrated Catchment Study
(ICS) carried out by Scottish Water in partnership with PKC, and more
targeted investigations at areas of known risk (such as Feus Road and
Bridgend), as well as the recent Craigie Burn flood protection study. The
existing integrated hydraulic flood model developed as part of the Perth ICS
(and updated for the Craigie Burn flood protection study) was reviewed and
updated in line with the latest approaches for surface water modelling
enabling the best available representation of the surface water risk at a city-
wide scale.
Page 77 of 126

Page 78

4.7 The SWMP analysed the integrated flooding mechanisms affecting Perth and
a series of flood maps were produced.  This work provided a detailed
understanding of surface water flood risk across Perth.  As part of this, areas
of highest surface water flood risk across this city were highlighted (referred to
as ‘flooding hotspots’). A total of 60 hotspots were identified. A plan showing
the location of these is provided in Appendix 1. 
4.8 The SWMP hydraulic model identified that pluvial flooding accounts for
approximately 22% of the flood risk across Perth.  A total of 405 properties
are potentially at risk from surface water flooding during a 1 in 30-year flood
event (the flood event with a 3.33% chance of occurring in any one year). In
future, for this same magnitude of event, the number of properties is
estimated to increase to 1,041 properties due to the effects of climate change.
A total of 1,217 properties are potentially at risk during a 1 in 200-year flood
event (the flood event with a 0.5% chance of occurring in any one year).  In
future this is estimated to increase to 2,198 properties due to the effects of
climate change. 
4.9  The 60 flooding hotspots cover the majority of properties identified at risk of
surface water flooding across Perth. For the modelled 1 in 30-year flood event
(the flood event with a 3.33% chance of occurring in any given year), 369 of
the 405 properties identified at risk are contained within a flooding hotspot
(91% of the total properties).  During the modelled 1 in 200-year flood event
(the flood event with a 0.5% chance of occurring in any given year), 988 of the
1,217 properties identified at risk are within a flooding hotspot (81% of the
total properties at risk during this event).   
4.10 In managing flood risk, the Council is required to have regard to the
economic, social and environmental impact of its actions. The Scottish
Government’s guidance recommends that decision making in flood risk
management should be supported by an options appraisal. 
4.11  An options appraisal includes a cost-benefit analysis and other techniques to
determine whether a flood protection scheme meets its objectives, is
sustainable and represents best value for money. In general, the cost of flood
damage avoided over time must be greater than the cost of building the flood
defences, i.e., they must achieve a benefit/cost ratio of greater than 1.0. 
4.12  Due to the high number of ‘hotspots’ identified, Amey carried out a screening
exercise to identify those areas within which there was a realistic chance of
identifying viable measures to manage surface water flood risk. This
screening exercise selected 29 of the initial 60 hotspots for further multi-
criteria assessment ahead of options appraisal.  The multi-criteria assessment
identified 14 (of the 29) flooding hotspots that had the highest potential to
identify viable surface water management measures. 
4.13 Areas that have been subject to separate investigations (previous or ongoing)
were also screened out. This included areas such as Bridgend, Cavendish
Avenue/Gray Street, Feus Road and Marshall Place. 
Page 78 of 126

Page 79

4.14  An initial long list of high-level options to manage the risk of flooding were
considered in the context of each flooding hotspot. Amey undertook an
iterative assessment to refine this for more detailed consideration.   A long list
of 18 options was selected (refer to Appendix 2 for details). 
4.15 This long list was assessed through a further multi-criteria (technical,
environmental and economic) appraisal to produce a preferred short-list of 10
options which were assessed in further detail. 
Table 1:Short list summary table
Option No  Location Option
1 Dupplin Road and Annat
Road
Disconnection & SUDS
2 Fields near Murray Royal Greenspace Attenuation
3 Connacher Bank
retirement living
Surface Water conveyance
route
5a Oakbank Rd and
Cherrybank Grove
Disconnection
5b Perth Academy Disconnection and SUDS
7 Millenium Park Greenspace attenuation
12a Rannoch Road (between
Newhouse Road and
Letham Road roundabouts)
Disconnection
12b Rannoch Road (between
Letham Road and Unity
Terrace roundabouts)
Disconnection
13 Whitefriars Industrial park Disconnection / SUDS
14 Dewars Centre/Perth
leisure pool
Disconnection / SUDS
4.16 The final short list of potential options, together with the estimated costs and
benefit/cost ratios, is provided in Appendix 2. 
4.17 Further detailed assessment of the 10 short-listed options identified that only
two options were considered feasible, both economically and in terms of
overall benefit. These were the disconnection and SuDS options at Whitefriars
Industrial Park (option 13) and Dewars/Perth leisure pool site (option 14).
4.18 Option 13 had an estimated capital cost of £0.412m with a benefit/cost ratio of
3.4. Option 14 had an estimated capital cost of £0.221m and a benefit/cost
ratio of 2.2. No standard of protection can be attributed to these options and
the benefit is measured in the overall reduction in annualised average flood
damages within the area. Wider benefits of removing surface water from the
combined sewer network would also be realised.
4.19 Due to the nature of the recommended options, it has been identified that the
best delivery mechanism for these would be through future development
opportunities at each site. 
Page 79 of 126

Page 80

4.19 A means to control delivery is through the next iteration of the local
development plan (LDP3), through site specific developer requirements
associated to development allocations and through Green-Blue Network
mapping and guidance.
4.20 The option at Dewars/Perth leisure pool was initially identified as an
opportunity to utilise the significant greenspace at the site in its current
form/use. The more recent, and ongoing, wider discussions regarding the
future use/redevelopment of this site do not alter these conclusions. There is
ongoing dialogue with the Council’s Property section and their drainage and
flood risk consultants regarding the future of the site to ensure that flood risk
benefits are realised.
4.21 The hydraulic model for the SWMP suggests that much of the main trunk
sewers running through Perth are affected by a lack of capacity, leading to
significant flooding at vulnerable points where manholes are particularly
shallow, or where sewer pipes are (relatively) undersized or have a low
gradient. This is a common issue in urban areas due to the historic approach
of using one ‘combined’ sewer system to deal with both foul and surface
water. Prior to the legal requirement of SuDS for new developments, this
approach increased pressure on these systems, and more recently, climate
change has become the main factor in reducing the relative capacity of sewer
systems.  Due to the limited areas across the city to store surface water
above ground, particularly around the areas of highest risk, alleviating this risk
typically requires significant infrastructure upgrades to enable storm flows to
be drained. These measures are prohibitively expensive and often face
technical challenges (spatial constraints and conflicts with buried utilities).
Scottish Water are required to undertake assessments of sewer flood risk, as
a prescribed action within the Tay Local FRM Plan and in line with their duties
under section 16 of the Flood Act. 
4.22 The SWMP highlights a number of ongoing projects/proposals which will help
manage overall surface water flood risk in Perth, namely ongoing Scottish
Water investment projects at Feus Road, Cavendish Avenue and Bells Sports
Centre. The Council has developed a detailed design for flood protection
works at Bridgend, but this is currently on hold due to delays in funding of
Cycle 2 schemes as a result of the ongoing discussions between Scottish
Government and CoSLA. 
4.23 The SWMP also recommends other non-structural actions that align with on-
going actions to manage flood risk under the Tay Local FRM Plan.  This
includes ensuring local and national planning policies are applied with regards
to surface water management in new developments. 
4.24 The SWMP advises that property flood resilience measures are an effective
tool to improve the overall flood resilience of the city. It recommends the
uptake of these measures by property owners in areas of surface water flood
risk, with a preference for passive measures (e.g. flood doors, automatic air
brick covers etc) due to the speed at which surface water flooding can occur.
Page 80 of 126

Page 81

This recommendation is in line with the recently published National Flood
Resilience Strategy. As part of the 2026-27 budget, the Council has approved
initial funding to support a Property Flood Resilience Grant that residents will
be able to apply for to assist with the costs of installing appropriate measures
at their property. 
4.25 In order to disseminate the findings of the SWMP, and to outline how flood
risk is being managed in the area, a newsletter summarizing the work was
published on the Council’s consultation hub
(https://consult.pkc.gov.uk/communities/perthswmp) during the period 1
October to 30 October 2025. The consultation period allowed residents to
view the draft outputs from the SWMP, speak directly to council officers,
design consultants and other agencies such as Scottish Water and Scottish
Flood Forum. Residents were encouraged to provide feedback on the surface
water management plan recommendations. 
4.26 A community drop-in session was held at the Dewar’s Centre on 29 January
2026. The community drop in event was attended by approximately 30
people, although only 14 people recorded their attendance via a sign in sheet.
The majority of attendees had previously submitted online feedback and took
the opportunity to follow up directly with Officers.  It should be noted that six
attendees were from areas out with the Perth SWMP study area and advised
that they attended to better understand the process in advance of another
SWMP that was being carried out for their locality. 
4.27 The feedback received during the consultation events or through submitted
comment forms covered a range of topics including the study methodology,
options appraisal and recommendations, as well as around existing
maintenance arrangements, new development and Scottish Water
infrastructure.   
4.28 A ‘Question & Answer’ report addressing the main comments raised during
the consultation period was disseminated to all respondents and is available
to view on the Consultation Hub
(https://consult.pkc.gov.uk/communities/perthswmp). The comments raised
were relevant and informative but did not fundamentally alter the conclusion
and recommendations of the SWMP.   
4.29 SWMPs should be monitored, reviewed and updated to align with the six-year
Flood Risk Management planning cycle. The next update is likely to be
required in Cycle 3 (2028-2034).
5. Proposals 
5.1 The SWMP does not recommend any standalone proposals and identified
collaborative opportunities that should be explored at the relevant time
through LPD3 and planning applications as they come forward to provide
surface water flood risk benefits. 
Page 81 of 126

Page 82

The mechanisms for this will likely be through site specific requirements
associated to development allocations and Green-blue network mapping and
guidance.
6. Conclusion 
6.1 This report provides an update on the outcome of the Perth Surface Water
Management Plan (SWMP). 
6.2 A surface water management plan was identified for Perth within the Tay
Flood Risk Management Plan and Local Flood Risk Management Plan. The
Council engaged consulting engineers, Amey Consulting Ltd, to deliver the
SWMP. 
6.3 The Council’s consulting engineers have not identified a feasible flood
protection scheme to manage areas at surface water flood risk in Perth.
However, the SWMP identified two areas where a significant reduction in
economic flood damages can be achieved through surface water separation
from the combined sewer and retrofitting SuDS. The potential redevelopment
of sites at Dewar’s and Whitefriars provides the opportunity to realise the
identified benefits. 
6.4 The SWMP reiterates the benefit of property flood resilience measures,
recommending further uptake by residents in areas at risk of flooding, in line
with the Scottish Government’s National Flood Resilience Strategy. The
Council has recently approved funding for a Property Flood Resilience Grant
that will support residents with the costs of installing appropriate measures. 
6.5 The SWMP also builds on and aligns with the Flood Risk Management
Actions centred on Community Engagement (i.e. sharing of information and
advice) and Community Resilience Groups (i.e. those community led groups
supported by the Council to develop resilience and flood protection on a local
scale).
7. Impact and Value Assessment 
This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.  
8. Appendices 
- Appendix 1: Perth SWMP 0.5% AEP flood map and hotspots 
- Appendix 2: Perth SWMP Options 
Page 82 of 126

Page 83

Appendix 1
6
Page 83 of 126

Page 84

Page 84 of 126

Page 85

Appendix 2 – Perth SWMP Options
Table 1: Perth SWMP Options Long list
Option 1:  SuDS Attenuation, additional road drainage on Dupplin Road and Annat Road with a raingarden opposite Gannochy Pond.
Option 2:  Upper catchment attenuation and storage in fields opposite the Rohallion Centre.
Option 3: Create a surface water route to the River Tay from the A93 through derelict land next to Conachar Court Retirement Living.
Option 4: South Inch Terrace disconnections and SuDS
Option 5a Kerb drainage and storm sewer upgrade on Oakbank Crescent and Oakbank Place.
Option 5b SuDS Attenuation within Perth Academy grounds, with conveyance swale and road drainage on Fairies Road.
Option 6: Lochie Brae and Bowerswell Road drainage 
Option 7:  SuDS Attenuation within Millenium Park
Option 8: Queens Avenue 
Option 9: Fairfield Avenue disconnections and SuDS
Option 10: Wallace Crescent disconnections
Option 11: Glenearn Rd - Inch View Primary disconnections
Option 12a Rannoch Road drainage upgrade and SuDS feature within Newhouse Road roundabout.  Kerb drainage along Rannoch
Road between Newhouse Road and Letham Road roundabouts.
Option 12b Kerb drainage along Rannoch Road between Letham Road and Unity Terrace roundabout, including periodic raingardens
for interception and traffic calming.
Option 13:  SuDS Attenuation and rooftop disconnection at Whitefriars Industrial Park
Option 14: Permeable pavement and SuDS attenuation at Dewars Centre and Perth Leisure Centre
Option 15: City centre increase permeable surfaces
Option 16:  City Centre SuDS at North Inch
Option 17: Muirton SuDS attenuation
Option 18: Feus Rd/Unity Terrace disconnections and SuDS 
Figure 1: Long and short list locations across Perth - those highlighted blue were taken forward to short list.
Appendix 2 6
Page 85 of 126

Page 86

Table 2: Perth SWMP short list summary table
Option
ID
Cluster
Number Option Description
Capital cost
(including 60%
optimism Bias)
Total PV
Benefits
Benefit:cost
ratio
1a 4
SuDS Attenuation, additional road drainage on
Dupplin Road and Annat Road with a raingarden
opposite Gannochy Pond.
£145,622 - £ 12,327 0
2 4 Upper catchment attenuation and storage in fields
opposite the Rohallion Centre. £189,201 - £ 11,212 0
3 4
Create surface water route to River Tay through
derelict land using cascading swales and
raingardens.
£134,231 £ 5,927 0
5a 9 Kerb drainage and storm sewer upgrade at
Oakbank Crescent and Oakbank Place. £171,180 £ 14,207 0.1
5b 9
SuDS swale and detention basin within Perth
Academy grounds to intercept drainage before it
reaches Oakbank Place.
£156,299 £ 21,291 0.1
7 2 SuDS attenuation in Millennium Park. £467,409 £ 8,457 0
12a 22
Rannoch Road drainage upgrade and SuDS feature
within Newhouse Road roundabout.  Kerb drainage
along Rannoch Road between Newhouse Road and
Letham Road roundabouts.
£399,633 £ 6,718 0
12b 56
Kerb drainage along Rannoch Road between
Letham Road and Unity Terrace roundabout,
including periodic raingardens for interception and
traffic calming.
£293,487 - £ 11,392 0
13 54 Whitefriars industrial rooftop disconnections. £412,647 £ 1,857,908 3.4
14 54 SuDS (infiltration and storage) Dewars Centre and
Perth Leisure Centre £220,600 £ 694,204 2.2 
Page 86 of 126

Page 87

Option 13 Schematic – Whitefriars Sewer disconnections/SuDS 
Option 14 Schematic – Dewars/Perth Leisure Pool Sewer disconnections/SuDS 
Page 87 of 126

Page 88

Page 88 of 126

Page 89

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board:   Climate Change & Sustainability   
Date of Meeting:   27 May 2026 
Report Title:  Bridge of Earn Surface Water Flood Study 
Report Number:  26/147 
Report Author:  Craig Harvey, Engineer, Flooding Team   
Organisational Lead:  Fraser Crofts, Strategic Lead – Environment 
and Infrastructure 
___________________________________________________________________
1. Purpose 
1.1 The purpose of this Report is to summarise the findings and outcomes of the
Council’s ‘Bridge of Earn Surface Water Flood Study (SWFS)'. The report
recommends that a flood protection scheme is taken forward for the study as
this has been found to be economically viable and will reduce the impact of
flooding for up to 26 properties. The proposed scheme will be submitted to
SEPA for national prioritisation and inclusion in the next Tay Flood Risk
Management Plan and Local Flood Risk Management Plan, to be published in
2028. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the completion of the Bridge of Earn SWFS as required by the Tay
Flood Risk Management Plan and Local Flood Risk Management Plan. 
7
Page 89 of 126

Page 90

2.2 Approves the recommendations of the study, including the proposals for a
flood protection scheme in Bridge of Earn that will benefit up to 26 properties. 
2.3 Notes that details of the recommended flood protection scheme for Bridge of
Earn will be submitted to SEPA for national prioritisation and inclusion in the
Cycle 3 (2028-2034) Tay Flood Risk Management Plan, to be published in
December 2027, and Tay Local Flood Risk Management Plan, due for
publication in 2028. 
2.4 Notes that public engagement events have been held to disseminate the
findings of the studies. 
2.5 Notes the requirement to monitor, review and update the Bridge of Earn
SWFS in Cycle 3 (2028-2034).
3. Background/Context 
3.1  Under the Flood Risk Management (Scotland) Act 2009, SEPA and lead local
authorities published their Cycle 1 Flood Risk Management (FRM) Strategies
and Local FRM Plans in December 2015 and June 2016 respectively. These
documents set out a range of actions that SEPA and responsible authorities
took to manage and, where possible, reduce the risk of flooding over a six-
year period. 
3.2 The (then) Environment Committee approved the content and publication of
the Cycle 1 Tay Local FRM Plan on 1 June 2016 (Report 16/241 refers). The
(then) Environment and Infrastructure Committee subsequently approved the
content of an Interim Report on the progress made in implementing the Cycle
1 Local FRM Plans on 23 January 2019 (Report 19/16 refers). 
3.3 SEPA and lead local authorities published updated Cycle 2 FRM Plans and
Local FRM Plans in December 2021 and December 2022 respectively for the
six-year period from 2022 to 2028. The Climate Change & Sustainability
Committee approved the content and publication of the Cycle 1 Final Report
and Cycle 2 Tay Local FRM Plan on 19 December 2022 (Report 22/307
refers). The Climate Change & Sustainability Committee subsequently
approved the content of an Interim Report on the progress made in
implementing the Cycle 2 Local FRM Plans on 10 November 2025 (Report
25/300 refers).  The published documents can be viewed at the following link:
http://www.pkc.gov.uk/frmplans. 
3.4 The published FRM Plans and Local FRM Plans identify various flood studies
as a means of further improving the understanding of flood risk in certain
locations. The plans identified a Surface Water Flood Study (SWFS) for
Bridge of Earn. The purpose of this study was to explore what further action
would be required to manage surface water flood risk in Bridge of Earn and
set this out in a plan. Actions could then be identified and assessed against
technical, economic and acceptability factors to determine feasibility. 
Page 90 of 126

Page 91

Any feasible actions could then be implemented as part of a flood protection
scheme. 
3.5 The 2009 Act provides local authorities with discretionary powers to promote
flood protection schemes. Only those flood schemes which have been
included in the published FRM Plans, the Local FRM Plans and the national
priority list are taken forward in the subsequent 6-year period. 
3.6 Although public authorities are expected to take a proactive role in managing
and, where achievable, lowering flood risk, the primary responsibility for
avoiding or managing flood risk still remains with land and property owners.
The 2009 Act does not alter this. Individuals, businesses and communities
must, therefore, play a critical role in making themselves more resilient and
helping to reduce the impact of flooding.
4. Main Issues 
4.1 Bridge of Earn is located in the River Tay catchment within Potentially
Vulnerable Area (PVA) 02/08/14. 
4.2 The primary source of flooding in Bridge of Earn is fluvial (river) flooding. 
Fluvial flooding was mitigated through the construction of the Bridge of Earn
Flood Prevention Scheme in 2001 and 2006 to provide, at that time, up to a 1
in 50-year standard of protection to the areas of Sealsbridge, Burnbank,
Riverside and Earnbank from the River Earn, Yellow and Deich Burn. 
4.3 A secondary source of flooding in Bridge of Earn is pluvial (surface water)
flooding.  The term surface water flooding is often used to describe the
complex interaction of many sources of flooding as a result of rainfall run-off
flowing overland, exceedance of small urban watercourses (including
culverted watercourses) or artificial drainage systems (e.g. combined sewer),
and groundwater. 
4.4 In September 2024, consultant engineers, RSK Binnies, were engaged to
carry out a SWFS for Bridge of Earn. 
4.5 Binnie’s investigations involved extensive data gathering and analysis,
consultations, topographic surveys, a hydrological assessment, hydraulic
modelling, an environmental desk study, an options study, an economic
appraisal and the production of final reports. 
4.6 The SWFS analysed the integrated flooding mechanisms affecting Bridge of
Earn and a series of flood maps were produced – refer to Appendix 1 for the 1
in 200-year flood map (the flood event with a 0.5% chance of occurring in any
one year). This work provided a detailed understanding of surface water flood
risk across the study area and identified 3 areas at high risk of flooding
(referred to as ‘flooding hotspots’) in Kintillo, Old Edinburgh Road, and Back
Street/Deich Burn. 
Page 91 of 126

Page 92

The properties located in Kintillo are at risk of flooding from the combined
sewer network and surface water runoff from the topographic high points
surrounding the area. The Old Edinburgh Road properties are at risk of
flooding from surface water runoff from the west and south-east. Back Street
is at risk from surface water runoff from topographic high points to the west,
east and south and its interaction with the existing flood prevention scheme
(flood walls and embankments) which protect the area from fluvial flooding. 
4.7 The SWFS hydraulic model identified that up to 12 properties are potentially
at risk during a 1 in 30-year flood event (the flood event with a 3.33% chance
of occurring in any one year). In future this is estimated to increase to 41
properties due to the effects of climate change. A total of 32 properties are
potentially at risk during a 1 in 200-year flood event (the flood event with a
0.5% chance of occurring in any one year). In future this is estimated to
increase to 95 properties due to the effects of climate change. 
4.8 In managing flood risk, the Council is required to have regard to the
economic, social and environmental impact of its actions. The Scottish
Government’s guidance recommends that decision making in flood risk
management should be supported by an options appraisal. 
4.9 An options appraisal includes a cost-benefit analysis and other techniques to
determine whether a flood protection scheme meets its objectives, is
sustainable and represents best value for money. In general, the cost of flood
damage avoided over time must be greater than the cost of building the flood
defences, i.e., they must achieve a benefit/cost ratio of greater than 1.0. 
4.10 Binnies initially considered a long list of 83 potential actions to manage the
risk of flooding. A high-level screening exercise removed clearly unfeasible
actions leaving a short-list of 37 actions. The short-listed actions were
combined to form 14 options for further assessment.  The options were
refined by a technical, environmental and economic appraisal to produce a
preferred short-list of 7 options. Details of the seven short listed options are
shown below in Table 1 and a location plan provided in Appendix 2. 
Page 92 of 126

Page 93

Table 1: Preferred short-list of options
Option No Location Option Description
Option 6 Old Edinburgh Road SuDS
Option 7 Old Edinburgh Road
(through Old
Edinburgh Place)
Flood relief surface
water pipe to Deich
Burn
Option 8 Clayton Road Surface water
diversion (speed
hump)
Option 9 Forgandenny Road Upstream storage
Option 10 Back Street Flood relief SuDS to
Yellow Burn
Option 11 Forgandenny Road &
Back Street
Upstream storage and 
surface water
improvements
Option 13 Back Street New surface water
pipeline to Deich Burn 
4.11 The final short list of potential options, together with the estimated costs and
benefit/cost ratios, is shown in Appendix 2. All options have a benefit/cost
ratio greater than one and could be progressed individually. 
4.12 To improve efficiencies the report recommends options 6 and 11 are
combined into a single flood protection scheme for Bridge of Earn. The
scheme will provide varying levels of benefit to reduce surface water flood risk
in hotspots 2 (Old Edinburgh Road) and 3 (Back Street/Deich Burn) and so a
standard of protection cannot be designated. However, If the scheme was
implemented the total number of properties at risk of flooding up to the 1 in
30-year flood event would be reduced by 10, rising to 26 in the 1 in 200-year
flood event. 
4.13 The recommended scheme is estimated to have a capital project cost of
£0.49M and an overall benefit/cost ratio of 5.5. The study has, therefore,
concluded that this proposed flood protection scheme is economically viable
and should be implemented. 
4.14 The study was unable to identify an economically beneficial option for Hotspot
1 (Kintillo), mainly due to the majority of flooding being external to properties
in this area, and flood mechanisms here were highly localised to each
property meaning it was not possible to develop an economically feasible
option to collectively mitigate risk throughout the hotspot. 
4.15 The SWFS also recommends non-structural actions (e.g. promote property
flood resilience measures and formation of a flood action group) that align
with on-going actions to manage flood risk under the Tay Local FRM Plan. As
part of the 2026-27 budget, the Council has approved initial funding to support
a Property Flood Resilience Grant that residents will be able to apply for to
assist with the costs of installing these measures at their property. 
Page 93 of 126

Page 94

4.16 In order to disseminate the findings of the SWFS, and to outline how flood risk
is being managed in the area, a newsletter was posted to local residents and
published on the Council’s Consultation Hub
(https://consult.pkc.gov.uk/communities/bridgeofearnswfsevents/
consult_view/) during the period 2 December 2025 to 23 January 2026. The
consultation period allowed residents to view the draft outputs from the
SWFS, speak directly to council officers, design consultants and other
agencies such as Scottish Water and Scottish Flood Forum.  Residents were
encouraged to complete a comment form to provide feedback on the SWFS
recommendations. 
4.17 Community drop-in sessions were also held at Dunbarney Church Hall, Brown
Street, Bridge of Earn on Wednesday 10 December 2025 and Tuesday 13
January 2026 from 2pm to 8pm. The community drop in events were attended
by approximately 40 local residents and 31 comment forms were submitted
during the consultation period.   
4.18 The feedback received indicated residents were generally supportive of
proposed options and were keen to see some of the proposals implemented
where possible.   However, concerns were raised in relation to beaver activity,
provision of SuDS at Clayton Road, perception of increased flood risk from
future local development, maintenance of gullies and the sewer network, and
landownership in areas where options were considered.   
4.19 A ‘Question & Answer’ report addressing the main comments raised during
the consultation period was disseminated to all respondents and is available
to view on the Consultation Hub
(https://consult.pkc.gov.uk/communities/bridgeofearnswfsevents/
consult_view/). The comments raised were relevant and informative but did
not fundamentally alter the conclusion and recommendations of the SWFS.   
4.20 Surface Water Management Plans (of which this SWFS forms part) should be
monitored, reviewed and updated to align with the six-year Flood Risk
Management planning cycle. The next update is likely to be required in Cycle
3 (2028-2034).
5 Proposals 
5.1 The Council’s consulting engineers, RSK Binnies, have recommended a flood
protection scheme for Bridge of Earn. It is proposed that this scheme
benefitting up to 26 properties is taken forward by the Council. 
5.2 The proposed flood protection scheme involves the combination of options 6
and 11 as set out in paragraphs 4.12 and 4.13. 
5.3 The Council will submit details of the proposed scheme to SEPA for
prioritisation (within the national list of flood schemes) and inclusion within the
Cycle 3 Tay FRM Plan and Local FRM Plan covering the period from 2028 -
2034. 
Page 94 of 126

Page 95

This process is essential to secure the necessary capital grant funding to
design and construct the scheme. This process cannot be accelerated, or it
will not be eligible for Scottish Government capital funding. 
5.4 The Cycle 3 Tay Local FRM Plan should set out the proposed implementation
arrangements for the flood scheme in Bridge of Earn, including timescales
and how it will be funded. However, due to the on-going Scottish
Government/COSLA Joint Funding Working Group review of capital funding
for flood schemes, and the other schemes that the Council is already
progressing, the timescales and funding arrangements for the Bridge of Earn
flood scheme remain unclear for the time being. The next phases of work to
develop the flood scheme proposals will therefore not commence until the
funding review provides further clarity around capital grant funding and
provision is made within the Council’s capital programme.
6 Conclusion 
6.1 This report provides an update on the outcome of the Bridge of Earn SWFS. 
6.2 A SWFS was identified within the Tay Flood Risk Management Plan and
Local Flood Risk Management Plan.  The Council engaged consulting
engineers, RSK/Binnies, to deliver the SWFS. 
6.3 The Council’s consulting engineers have recommended a flood protection
scheme for Bridge of Earn that will reduce the impact of flooding for up to 26
properties. The proposed scheme is economically viable, and the preliminary
proposals consist of various measures to reduce the risk of flooding from a
combination of flood mechanisms. This report, therefore, seeks the
Committee’s approval to promote the consulting engineer’s recommended
proposals as a flood scheme for Bridge of Earn, subject to funding. 
6.4 In line with the Scottish Government’s National Flood Resilience Strategy, the
SWFS reiterates the benefits of property flood resilience measures and
recommends residents consider installing relevant measures in areas at risk
of flooding. The Council has recently approved funding for a Property Flood
Resilience Grant that will support residents with the costs of installing
appropriate measures. 
6.5 The SWFS also builds on and aligns with the Flood Risk Management Actions
centred on Community Engagement (i.e. sharing of information and advice)
and Community Resilience Groups (i.e. those community led groups
supported by the Council to develop resilience and flood protection on a local
scale).  
Page 95 of 126

Page 96

7. Impact and Value Assessment 
Impact and Value Assessments - Perth & Kinross Council
8. Appendices 
8.1 Appendix 1: Bridge of Earn SWFS 0.5% AEP flood map 
8.2 Appendix 2: Bridge of Earn SWFS Options and hotspots 
Page 96 of 126

Page 97

Appendix 1
Bridge of Earn SWFS 0.5% AEP (1 in 200-year) Flood Map 
Figure 1 - Baseline flood map 1:200-year event
7
Page 97 of 126

Page 98

Page 98 of 126

Page 99

Page 1 of 2 
Appendix 2
Bridge of Earn SWFS Options and Hotspots 
Figure 1 – Short-listed Options and Hotspots 
7
Page 99 of 126

Page 100

Page 2 of 2 
Figure 2 - Estimated costs and BCRs of short-listed options
Page 100 of 126

Page 101

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Climate Change and Sustainability 
Date of Meeting: 27 May 2026 
Report Title: Perth & Kinross Council Property Flood Resilience
Grant 
Report Number: 26/148 
Report Author: Dr Rick Haynes, Flooding Manager 
Organisational Lead: Fraser Crofts, Strategic Lead – Environment &
Infrastructure
___________________________________________________________________
1. Purpose 
1.1 The purpose of this Report is to seek approval to implement the Property
Flood Resilience Grant (PFRG) process to support properties at risk of
flooding. 
1.2 Sections 
1. Purpose
2. Recommendation(s)
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices
2. Recommendation(s) 
It is recommended that the Committee: 
2.1 Approve the implementation of the Property Flood Resilience Grant process
as detailed in Section 5 (and Appendix 1) which affords up to £5,000 per
private property / business for the assessed installation of property flood
resilience measures. 
8
Page 101 of 126

Page 102

3. Background/Context 
3.1  On the December 2021 Councillors unanimously backed the Draft Climate
Change Strategy and Action Plan, which sets out how Perth and Kinross will
reach net zero carbon emissions by 2045. 
3.2 The Strategy is guided by the following principles: 
• Achieving Net Zero aligned with the Paris Agreement and Scottish
Government targets by 2045, if not before.
• Building a more resilient Perth and Kinross.
• Ensuring climate change action is fair and the transition to a green
economy benefits all.
• Enhancing biodiversity.
• Engaging young people and empowering them to take action against
climate change.
• Empowering businesses and communities to take climate action in line
with the Perth and Kinross Offer. 
3.3 In recent years, the Perth and Kinross area has experienced a number of
extreme weather events. In the past four years, there have been over 1,000
reports of flooding to properties, businesses and roads. 
3.4 Flood risk management in Scotland is a shared responsibility. While
responsible authorities work together to reduce overall flood risk through
strategic planning, investment and maintenance, individuals and communities
remain the first line of defence against flooding. Local Flood Risk
Management Plans therefore place strong emphasis on self‑help, awareness
raising and community resilience, recognising that informed and prepared
households are essential to reducing the impacts of flooding now and in the
future. 
3.5 This is also in line with the ‘National Flood Resilience Strategy’1 published by
Scottish Government in December 2024. Specific note should be made of the
vision of the Strategy that is ‘Our people and places are prepared for
increased flooding and we are adapting to a changing climate and creating
sustainable resilient places in ways that are inclusive and fair.’ 
3.6 On 04 March 2026, as part of the FY2026-27 budget setting process
(document 26/54 refers2), Amendment was made to introduce a £150,000
non-recurring fund to support the provision of flood prevention measures at a
property scale. 
3.7 In developing the Grant funding approach, consideration has been given to
the most appropriate process, the level of Grant award, the level of flood risk
to an area and the Grant application process. 
1 National Flood Resilience Strategy
2 Document 26/54
Page 102 of 126

Page 103

4. Main Issues 
4.1 There is a well-known challenge within the Flood Risk Management
professional community that delivery of large-scale Flood Protection Scheme
is difficult, both in term of securing funding and also the timelines from
concept to construction completion. The community-scale funding support for
Resilience Groups is expected to add another layer of flood protection
capability, either where Flood Protection Schemes are not achievable, or to
supplement them. 
4.2 The Property Flood Resilience Grant (PFRG) will add yet one more layer of
protection and allow property owners access to materials that may have been
unaffordable in the past. This supports all five aspects of the Perth and
Kinross Council Vision, but specifically that which seeks to ensure that
communities are resilient. Is also supports a number of the seven Priorities. 
4.3 A visual representation of this complementary approach would be as follows: 
5 Proposals 
5.1 Based on feedback from other local authorities over the different models
available (e.g. bulk purchase and re-sale of material, site specific purchase of
materials or lump sum grants for flexible usage), Perth and Kinross Council
has chosen to provide a monetary PFRG to applicants for purchase and
installation of property specific flood resilience measures. 
5.2 The proposals here are expected to complement the existing community-
group scale approach managed by the Perth and Kinross Council Civil
Contingencies Team as approved at the Finance and Resources Committee
on 22 November 2023 – Report 23/3153. 
3 https://tinyurl.com/23-315-Minutes
Property Flood
Resilience
Measures
Community Group
Scale Flood
Resilience
Measures
Flood Protection
Schemes
Page 103 of 126

Page 104

The Community Group Scale Grant programme is expected to enable groups
to access funds to purchase flood resilience materials such as demountable
barriers, sandbags, signage etc. It will also be used to enable training to be
delivered to Council officers to better support community groups. 
5.3 The principle of this Community Group Scale Grant programme is embedded
within the Improvement Actions noted in Report 23/232, which is the main
report submitted to Scrutiny and Performance Committee on 22 November
20234. 
5.4 Perth and Kinross Council’s proposed PFRG model will be underpinned by
the CIRIA C790 Code of Practice for Property Flood Resilience, which
provides the UK’s recognised benchmark standards for the assessment,
design, installation, and maintenance of PFR measures that both to resist
floodwater entry and to reduce damage if flooding occurs - to minimise the
impact of flooding on people, property, and recovery time. The Code of
Practice (CoP) sets out a structured, evidence-based approach that enables
households and businesses to reduce flood damage, accelerate recovery,
and increase long-term resilience. 
5.5 The outline PFRG process is summarised below and in Appendix 8.1: 
a) Applicants contact Perth and Kinross Council via phone, email, web or
letter to commence application process. 
b) Applicants, with assistance from Perth and Kinross Council, complete
and submit an application5, including supporting information consisting
of:
• Property flood history and risk of flooding. 
• Scottish Flood Forum (or approved other) property assessment
report 
• Works quotation
• Completed application, including signed terms and conditions. 
c) Perth and Kinross Council assess the application and notify applicant of
level of funding award. 
d) Perth and Kinross Council issue the applicant with the funding award (up
to £5,000).
e) Perth and Kinross Council inspect the completed works to ensure
compliance (see section 5.20 for detail). 
5.6 As part of the process noted above, the applicant will be encouraged to
contact the Scottish Flood Forum to request a property flood assessment
report or fund a suitably qualified inspector to assess the property. They can
then take this to a contractor to provide a quotation for the works.
Alternatively, they can cost the works themselves with supporting evidence,
for example, quotations for materials. This should then be provided to Perth
and Kinross Council in support of their application to determine the level of
PFRG funding. 
4 https://tinyurl.com/23-232-Report
5 See Appendix 8.3
Page 104 of 126

Page 105

5.6 The Scottish Flood Forum is an independent charitable organisation funded
by the Scottish Government to support individuals and communities at risk to
or affected by flooding. They offer support mechanisms and advice which
includes site-specific property assessments, informing the property owner of
the most appropriate measures to implement and minimise the risk of
flooding. The Flooding Team has consulted with the Scottish Flood Forum to
ensure a consistent approach for applicants. 
5.7 In section 5.6(c) above, the Council will assess the application in terms of
completeness of supporting information provided. Should insufficient
information be provided to justify the award of a PFRG amount, the Council
will seek to clarify with the applicant such that the award of a PFRG can be
defended. Should an applicant not provide suitable or sufficient information,
the application will be rejected. 
5.8 To ensure the public are made aware of the PFRG, communications are being
developed through the Customer and Digital Services Portfolio. This will be
through an awareness raising campaign via social media and newspaper
outlets, with contact methods included. Further updates will be provided to
members as these aspects progress. 
5.9 The level of PFRG per household was determined using the online Scottish
Flood Forum Property Protection Advisor Tool. This identified £5,000 as a
suitable PFRG cap amount to support property owners in purchasing the
necessary flood protection equipment. Depending on the approach taken by
the applicant, this would mean the Council covering between 53% and 72% of
the costs. The results are presented in Appendix 8.2. That being said,
feedback from Fife Council noted that despite using the same £5,000 cap, and
assessment tools, the average PFRG award sat at just under £3,400,
resulting in both total funding to the applicant, and the ability to assist more
applicants with the surplus. 
5.10 It is proposed that the PFRG funding is available to both private property and
business owners. 
5.11 Perth and Kinross Council Housing and Communities Portfolio are in the
process of protecting council owned rental properties. Consequently, Perth
and Kinross Council properties are excluded from the PFRG process. If a
Perth and Kinross Council property is physically connected to a privately
owned property, these will be assessed on a case-by-case basis to seek
equitable outcomes. 
5.12 Should the assessment indicate costs in excess of the £5,000 PFRG award,
the property owner will be required to fund any further cost. 
5.13 Once the quantum of the PFRG has been agreed, and the necessary
supporting information provided, the PFRG funds will be issued to the
applicant in advance of the individual applicant’s works being progressed. 
Page 105 of 126

Page 106

5.14 The PFRG will be distributed on a first come first served basis and will not be
issued to properties claiming for existing Property Flood Resilience Measures
such as via the Community Group Scale Grant. 
5.15 In the event that multiple conjoined properties (whether all privately owned or
private / public mix) seek an application to cover all properties, a bespoke
exercise will need to be undertaken to assess the complete structure and a
unanimous agreement from all parties will be needed before the application
can be progressed. This agreement must be evidenced to the Council by the
applicant(s) as part of the application process.  
5.16 It is anticipated that the time to complete the PFRG and receive the PFRG will
be approximately four weeks. This is however subject to change for properties
that require Planning based determinations regarding Planning Permission
(Conservation Areas) and/or Listed Building Consent. These delays may
occur when specific materials and finishes require approval to comply with
built heritage constraints; some ‘mainstream’ materials may not be acceptable
in these situations. In such instances, the Council will look to work with the
applicant to set aside the PFRG fund for a reasonable period of time to allow
permissions to be agreed. The applicant may use the PFRG to appoint 3rd
parties to assist in the above application/s process, but the maximum grant
award will remain at £5,000. 
5.17 The expectation is that the property flood resilience measures will be installed
within a calendar year of the award of the PFRG amount, and by the
‘Completion Date’ as agreed between the Council and the applicant. 
5.18 The Council will not however be undertaking an inspection to approve the
quality of the works; that will be a matter agreed between the applicant and
their installation contractor. The Council will be undertaking an inspection to
confirm the installation of PFR materials per the original application and
associated documents. 
5.19 In the event the works have not been undertaken per the application and/or by
the agreed ‘Completion Date’, Perth and Kinross Council shall be entitled
within 21 days of demand to recover the PFRG or such amount of the PFRG
as Perth and Kinross Council deems appropriate. Agreements to amend the
works and/or ‘Completion Date’ will be considered on a case-by-case. The
aim is to progress efficiently to use the PFRG to increase property resilience
and not to enter protracted discussions. 
5.20 Resourcing for the delivery of the PFRG will be from the existing Flooding
Team, supported by AI / Digital tools to automate information flows where
possible. Assessment of application bundles will be managed by Engineers
and Technicians, and on-site corroboration of installations will be undertaken
by Watercourse Inspectors, all from the Flooding Team. 
Page 106 of 126

Page 107

5.21 Consultation with other Services has concluded as follows 
- Legal: No initial issues with proposals and committed to work with
Flooding Team to deliver the PFRG.
- Finance: No initial issues with proposals and committed to work with
Flooding Team to deliver the PFRG.
- Insurance: No initial issues with proposals.
- Procurement: No initial issues with proposals.
- Planning: No initial issues with proposals though commented on
challenges associated with Listed Building Consents and Planning
Permissions in Conservation Areas. They are, however, committed to
work with Flooding Team to deliver the PFRG.
6 Conclusion 
6.1 The £150,000 in PFRG funding offers property and business owners equitable
access to a PFRG of up to £5,000 per property, reaching a minimum of 30
properties across Perth and Kinross. 
6.2 The PFRG measures will help protect individual properties and businesses
from the effects of flooding.
7. Impact Value Assessment 
IVA: Impact and Value Assessment 
DPIA: Completed and signed off by DPO
EFIA: Completed and submitted
8. Appendices 
8.1 Property Flood Protection Grant process 
8.2 Average Household Cost 
8.3 Example Application Form 
Page 107 of 126

Page 108

Page 108 of 126

Page 109

Appendix 1
Property Flood Protection Grant Process 
1
•Interested party:
•Contact Perth and Kinross Council via email / website / telephone /
Letter
•Obtain copy of 'Introduction Letter' and Grant Application form from
website or hardcopy.
2
•Interested party:
•Completes the necessary forms and gather supporting information
(flood history, SFF Report, detailed works quotation, Planning
permissions / Listed Building Consent if required)
•Submits completed application pack to Perth and Kinross Council
3
•Perth and Kinross Council:
•Assess Grant Application
•Notify applicants of outcome
4
•Successful Applicants:
•Receive funds
•Install flood defence measures
5
•Perth and Kinross Council:
•Confirm completion of process and inspect property to confirm
compliance with application
8
Page 109 of 126

Page 110

Page 110 of 126

Page 111

Appendix 2
Average Household Cost 
23
23%
24
24%28
29%
24
24%
PERTH & KINROSS AREA
PROPERTY TYPE ASSESSMENT
Detached House
Semi-Detached House
Terraced House
Flat
Detached
House
Semi-
Detached
House
Terraced
House Flat
Manual Cost from SFF (Average) £7,759.57 £7,391.67 £6,393.93 £6,465.00
Automatic Cost from SFF (Average) £10,609.57 £10,241.67 £8,472.50 £8,515.00
Manual Cost from Market Cost
(Average) £7,431.30 £7,145.83 £5,570.71 £5,565.00
Automatic Cost from Market Cost
(Average) £10,431.30 £10,083.33 £7,124.29 £7,065.00
£0.00
£2,000.00
£4,000.00
£6,000.00
£8,000.00
£10,000.00
£12,000.00
PERTH  & KINROSS AREA
PROPERTY CLASS AVERAGE PFRG COST TOTALS
8
Page 111 of 126

Page 112

Page 112 of 126

Page 113

Appendix 3
Example Application Form 
8
Page 113 of 126

Page 114

Page 114 of 126

Page 115

Page 115 of 126

Page 116

Page 116 of 126

Page 117

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee:  Climate Change and Sustainability 
Date of Meeting:  27 May 2026 
Report Title:  Nature Restoration Fund 2026-2027 
Report Number:  26/149 
Report Author:  Hannah Wilson – Climate Change Land Restoration
Officer 
Organisational Lead:  Fraser Crofts – Strategic Lead Environment &
Infrastructure
___________________________________________________________________
1. Purpose 
1.1 The purpose of this Report is to outline the proposed approach for utilising
allocation the Council receives from the Scottish Government’s Nature
Restoration Fund (NRF) for 2026-2027. It has now been confirmed by the
Head of Finance that Perth and Kinross Council will receive £147,000 in
capital funding through the NRF. At the time of writing, confirmation of
accompanying revenue allocation is still awaited. In anticipation of further
funding details, it is necessary to seek approval in advance for the framework
and priorities for deploying the fund. This will ensure that the Council can
respond promptly, and effectively once full funding arrangements are
confirmed. 
1.2 Early approval of the proposed approach will enable the Council to: 
• Engage early with communities, landowners, and partner organisations,
ensuring they are ready to develop and submit projects aligned with NRF
priorities.
• Provide timely notice of changes to funding criteria and priorities, helping
applicants understand expectations, eligibility, and required supporting
information.
• Promote new funding opportunities without delay, allowing potential
applicants and delivery partners to prepare high quality proposals as
soon as the Scottish Government announcement is made. 
9
Page 117 of 126

Page 118

• Advance preparatory work for seasonal delivery, particularly for habitat
creation and tree planting projects that rely on tight planting windows in
late autumn and winter. Early preparation is essential to avoid missing
key delivery periods.
• Streamline internal processes, including new applications forms and
rating systems. 
1.3 The report also seeks approval for delegating authority to the Strategic Lead
for Environment and Infrastructure to approve projects recommended by the
NRF working group. This approach ensures that projects can be implemented
efficiently within the available funding period, maximising their impact on
biodiversity and climate adaptation. 
1.4 Sections 
1. Purpose
2. Recommendation
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment 
2. Recommendation 
It is recommended that the Committee: 
2.1 Approves the proposed funding structure for the 2026-27 NRF, recognising
that implementation is subject to final confirmation of revenue funding from
the Scottish Government. 
2.2 Approves the delegation of authority to the Strategic Lead for Environment
and Infrastructure to approve projects recommended by the NRF Working
Group.
3. Background/Context 
3.1  The Nature Restoration Fund (NRF) is a 5-year initiative that began in 2021 to
support projects that restore nature and improve biodiversity. Over the past
five years, PKC has received a total of £1,106,000 through the Edinburgh
Process strand of the Nature Restoration Fund, funding over 80 Council,
community, and landowner-led projects across the region. 
3.2 The money has been available for both Council teams and community
organisations to bid for annually. These have been selected to maximise the
biodiversity, climate change and wider community benefits.  
3.3 The 2025-2026 NRF award was allocated to 24 projects. 
Page 118 of 126

Page 119

The funded projects involved a mix of invasive non-native species control,
pond creation and restoration, meadow and habitat corridor enhancements,
and targeted works such pollinator friendly habitat creation. It also supported
tree and montane plant nursery development, ecological surveys, and
specialist training to enable effective habitat restoration across key sites. 
3.4 The 2025-2026 NRF detailed project report will be completed and distributed
to councillors once all projects have completed their final report. 
3.5 The Scottish Government has confirmed capital budget for Year 6 of the NRF
funding available to local authorities in 2026-2027. The Council is currently
awaiting confirmation of revenue budget for the same period. 
3.6 The NRF is directly supporting the Council’s Corporate Plan priorities of
tackling Climate Change and supporting sustainable places, focusing on
adaptation and addressing the biodiversity emergency.
4. Main Issues 
4.1 One of the main challenges with the NRF is the need for advance approval
before projects can begin. Many restoration projects are seasonal in nature,
meaning that to meet the required timelines, work must commence at specific
times of the year. Delays in obtaining approval can result in missed windows
for implementation, which ultimately impacts the success of projects.
Delegated authority will ensure rapid mobilisation, early communication with
applicants, and the ability to meet seasonal planting windows. 
4.2 Another key issue is the lack of existing funding routes for small-scale
woodland creation (<0.25ha) and for woodland restoration. The revised NRF
structure directly addresses these gaps and supports emerging Nature
Networks work. Comparator schemes (e.g., Dumfries and Galloway
Woodlands, Borders Forest Trust) demonstrate high demand and successful
delivery for small-scale planting, reinforcing the need for a similar model
locally. 
5. Proposals 
5.1 A revised funding structure is proposed for the 2026-27 Nature Restoration
Fund (NRF), reflecting the need to focus resources on small-scale woodland
creation, woodland restoration, Leven Landscape Enterprise Network, and a
pot for wider nature restoration. This structure aligns the fund with Nature
Networks priorities, complements national forestry schemes, and addresses
known gaps in support for small-scale connectivity planting and restoration
work. The revised approach ensures that the NRF does not duplicate national
Forestry Grant Scheme funding, but instead fills identified gaps and supports
smaller, localised interventions that provide high biodiversity value. All
proposals assume continuation of Scottish Government funding but remain
subject to confirmation. 
Page 119 of 126

Page 120

5.2 The revised structure includes four complementary funding pots, each
addressing a specific gap in current provision: 
5.2.1 Revenue Pot: Woodland Restoration 
Proposed allocation: 85% of revenue budget 
Purpose: To support practical actions that improve the condition, structure
and long-term resilience of native and ancient woodlands. Priority activities
include bringing unmanaged native woodland back into management,
restoring ancient woodland sites, improving structural diversity, and reducing
pressures such as invasive non-native species e.g. rhododendron, shading,
nonnative regeneration and deer impacts. The fund will also support the
protection and management of traditional orchards and veteran trees. 
Projects may include, but are not limited to: Selective thinning and halo
thinning, coppicing and pollarding, creation of glades and rides, enhancement
of shrub layers, invasive non-native species removal, removal of non-native
trees, chemical-free bracken control, creation or retention of standing and
fallen deadwood, veteranisation techniques (work to young trees to accelerate
the development of ecological features typically found only in old veteran
trees, such as decay, hollowing, and cavities), encouraging natural
regeneration and targeted native planting, establishing buffer strips, improving
habitat connectivity and reinstating wetland features within woodland
landscapes. 
Why needed:
• Only 36% of native woodland in Perth and Kinross is currently in good
condition for biodiversity, making restoration a high priority.
• These actions align strongly with the Tayside Local Biodiversity Action
Plan (LBAP), contributing to a wide range of priority actions. 
5.2.2 Revenue Pot: Leven Landscape Enterprise Network (LENS) 
Proposed allocation: 15% of revenue budget 
Purpose: To support landscape-scale land management actions delivered
through LENS that improve biodiversity, water quality, and climate resilience.                                   
Projects may include, but are not limited to: 
• Cover crops and green manures 
• Reduced fertiliser and improved nutrient management 
• Soil health and regenerative land management practices 
• Actions that reduce diffuse pollution and improve water quality 
Why needed:
• LENS is driving a significant increase in delivery at a landscape scale,
moving beyond small site-based projects. However, many of the key
measures are revenue-based and not well supported by capital funding.
Page 120 of 126

Page 121

• A dedicated revenue allocation would enable us to support outcomes
rather than just capital works, increase farmer participation, and unlock
wider partnership funding, allowing the Council’s contribution to act as a
catalyst for greater investment. 
5.2.3 Capital Pot: Small-scale Native Woodland Creation (<0.25 ha) 
Proposed allocation: 20% of capital budget 
Purpose: To support small-scale native woodland creation and individual tree
planting, particularly where these strengthen biodiversity corridors or make
use of marginal farmland or community space 
Key Features: Offering grants of up to £1,000 per applicant to support tree
and small woodland planting. Assistance may cover up to 100% of materials
costs for private applicants (farmers, landowners and individuals), and up to
100% of materials and labour costs for non‑profit organisations such as
schools and community groups. 
Why needed:
• The Forestry Grant Scheme has a minimum size threshold of 0.25ha,
leaving a funding gap for smaller but strategically vital woodland creation.
• Evidence from Dumfries and Galloway Woodlands (~70 small
projects/year) and Borders Forest Trust demonstrates strong demand and
straightforward delivery for small-scale, high impact planting.
• These small plantings are critical for providing stepping stone habitat in a
fragmented landscape, helping to delivering Nature Networks. 
5.2.4 Capital Pot: Wider Nature Restoration 
Proposed allocation: 80% of capital budget 
Purpose: Deliver wider nature restoration that fall outside woodland specific
schemes. It is intended to deliver high impact nature restoration across both
urban and rural areas, and to maintain continuity for successful multiyear
projects where further funding would maximise biodiversity outcomes. 
Projects may include, but are not limited to: meadow creation and
enhancement, pollinator corridors, SuDS ponds and wetland improvements,
riparian buffer planting, habitat connectivity works, invasive non-native
species control, species specific habitat improvements, and other locally
important restoration actions 
Why needed:
• This pot ensures continued flexibility to respond to local priorities, support
innovation, and fund actions that have no other viable funding route.
• Preference will be given to continuing or expanding successful projects
from previous years, where additional phases will deliver the greatest
biodiversity gains and maintain momentum in community‑led or
partnership‑based initiatives.
Page 121 of 126

Page 122

5.3 Applications will be invited from internal services, community organisations,
landowners and partner groups, with all projects reviewed. The existing NRF
Working Group process will continue, with: 
• Initial review by the NRF Coordinator;
• Assessment of applications by the Working Group;
• Recommendation of projects for approval. 
5.4 With the revised funding structure, a full scoring matrix will not be required for
all funding pots. Small-scale native woodland creation and woodland
restoration projects will be assessed on a first come, first served basis, which
require eligibility checks rather than comparative scoring. For the wider nature
restoration pot, a simplified application form and streamlined scoring process
will be used (see Appendix 1), with an emphasis on supporting continuation of
successful existing projects. 
5.5  Given the need to mobilise quickly for seasonal woodland creation and habitat
works, the Committee is asked to delegate authority to the Strategic Lead for
Environment and Infrastructure to finalise the methodology and approve
projects recommended by the Working Group. This will minimise delays and
enable rapid commencement of delivery. 
5.6  This approach supports delivery of the Council’s Biodiversity Duty under the
Nature Conservation (Scotland) Act 2004, and enables community
organisations, internal teams and landowners to progress nature restoration
work without unnecessary delay. 
5.7 If the proposed funding structure is approved in principle, officers will refine
the detailed eligibility criteria, simplified scoring methodology, delivery model,
and engagement processes, and implement these under delegated authority
from the Strategic Lead for Environment and Infrastructure.
6. Conclusion 
6.1 The proposed funding structure for the 2026-27 NRF provides a more
strategic, targeted approach to delivering nature restoration across Perth and
Kinross. By establishing dedicated pots for small‑scale woodland creation,
woodland restoration, Leven LENS, and wider nature recovery, the Council
can address clear gaps in national funding, strengthen ecological connectivity,
and support high‑impact local projects. 
6.2 Although confirmation of Scottish Government revenue funding is still
pending, early approval of this approach, along with delegated authority for
timely decision-making, will ensure that the Council is fully prepared to
mobilise quickly once allocations are announced. This will enable projects to
commence within key seasonal windows, maximise biodiversity benefits and
support delivery of the Council’s statutory Biodiversity Duty. 
Page 122 of 126

Page 123

7. Impact and Value Assessment 
https://www.pkc.gov.uk/media/55074/Nature-Restoration-Fund-2026-
2027/pdf/Nature_Restoration_Fund_2026-2027.pdf?m=1775543342050
8. Appendices
8.1 Appendix 1 – Wider Nature Pot Scoring Matrix 
Page 123 of 126

Page 124

Page 124 of 126

Page 125

Wider Nature Pot Scoring Matrix
Criterion Scoring descriptors Score
Biodiversity
Benefit 
0 – Biodiversity benefits are unclear, minimal, or not well evidenced. 
1 – Project delivers limited or small-scale biodiversity benefits, with
basic justification. 
2 – Clear, credible local biodiversity improvements (e.g. improved
habitat condition or targeted species benefit). 
3 – Strong restoration proposal using appropriate methods, clearly
improving habitat quality and/or species diversity. 
4 – High-quality restoration with potential for significant biodiversity
gains, ecosystem recovery and/or habitat connectivity at a wider scale.
0–4
Continuation
and Added
Value of
Existing Work
0 – New standalone project with no connection to previous work. 
1 – Clear continuation or expansion of previous restoration with added
benefits (e.g. increased area, improved management, greater
resilience). 
2 – Strong continuation of a demonstrably successful project,
significantly increasing impact, longevity or ecological value.
0–2
Maintenance 
0 – No maintenance or long-term management arrangements identified. 
1 – Some maintenance outlined, but responsibilities or actions lack
detail or certainty. 
2 – Clear, realistic plan for ongoing maintenance and stewardship, with
named responsibility and appropriate actions.
0–2
Value for
Money and
Deliverability
0 – Costs are unclear, poorly justified, or disproportionate to outcomes;
deliverability uncertain. 
1 – Costs are reasonable, clearly explained, and proportionate to the
scale and benefits of the project; delivery appears achievable.
0–1
Community
Involvement
0 – No evidence of community involvement or engagement. 
1 – Community involvement and engagement (e.g. volunteers,
consultation, or local partnerships).
0-1
Total Score  /10 
Appendix 1
9
Page 125 of 126

Page 126

Page 126 of 126