Page 1

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board:   Climate Change & Sustainability   
Date of Meeting:   27 May 2026 
Report Title:  Bridge of Earn Surface Water Flood Study 
Report Number:  26/147 
Report Author:  Craig Harvey, Engineer, Flooding Team   
Organisational Lead:  Fraser Crofts, Strategic Lead – Environment 
and Infrastructure 
___________________________________________________________________
1. Purpose 
1.1 The purpose of this Report is to summarise the findings and outcomes of the
Council’s ‘Bridge of Earn Surface Water Flood Study (SWFS)'. The report
recommends that a flood protection scheme is taken forward for the study as
this has been found to be economically viable and will reduce the impact of
flooding for up to 26 properties. The proposed scheme will be submitted to
SEPA for national prioritisation and inclusion in the next Tay Flood Risk
Management Plan and Local Flood Risk Management Plan, to be published in
2028. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the completion of the Bridge of Earn SWFS as required by the Tay
Flood Risk Management Plan and Local Flood Risk Management Plan.

Page 2

2.2 Approves the recommendations of the study, including the proposals for a
flood protection scheme in Bridge of Earn that will benefit up to 26 properties. 
2.3 Notes that details of the recommended flood protection scheme for Bridge of
Earn will be submitted to SEPA for national prioritisation and inclusion in the
Cycle 3 (2028-2034) Tay Flood Risk Management Plan, to be published in
December 2027, and Tay Local Flood Risk Management Plan, due for
publication in 2028. 
2.4 Notes that public engagement events have been held to disseminate the
findings of the studies. 
2.5 Notes the requirement to monitor, review and update the Bridge of Earn
SWFS in Cycle 3 (2028-2034).
3. Background/Context 
3.1  Under the Flood Risk Management (Scotland) Act 2009, SEPA and lead local
authorities published their Cycle 1 Flood Risk Management (FRM) Strategies
and Local FRM Plans in December 2015 and June 2016 respectively. These
documents set out a range of actions that SEPA and responsible authorities
took to manage and, where possible, reduce the risk of flooding over a six-
year period. 
3.2 The (then) Environment Committee approved the content and publication of
the Cycle 1 Tay Local FRM Plan on 1 June 2016 (Report 16/241 refers). The
(then) Environment and Infrastructure Committee subsequently approved the
content of an Interim Report on the progress made in implementing the Cycle
1 Local FRM Plans on 23 January 2019 (Report 19/16 refers). 
3.3 SEPA and lead local authorities published updated Cycle 2 FRM Plans and
Local FRM Plans in December 2021 and December 2022 respectively for the
six-year period from 2022 to 2028. The Climate Change & Sustainability
Committee approved the content and publication of the Cycle 1 Final Report
and Cycle 2 Tay Local FRM Plan on 19 December 2022 (Report 22/307
refers). The Climate Change & Sustainability Committee subsequently
approved the content of an Interim Report on the progress made in
implementing the Cycle 2 Local FRM Plans on 10 November 2025 (Report
25/300 refers).  The published documents can be viewed at the following link:
http://www.pkc.gov.uk/frmplans. 
3.4 The published FRM Plans and Local FRM Plans identify various flood studies
as a means of further improving the understanding of flood risk in certain
locations. The plans identified a Surface Water Flood Study (SWFS) for
Bridge of Earn. The purpose of this study was to explore what further action
would be required to manage surface water flood risk in Bridge of Earn and
set this out in a plan. Actions could then be identified and assessed against
technical, economic and acceptability factors to determine feasibility.

Page 3

Any feasible actions could then be implemented as part of a flood protection
scheme. 
3.5 The 2009 Act provides local authorities with discretionary powers to promote
flood protection schemes. Only those flood schemes which have been
included in the published FRM Plans, the Local FRM Plans and the national
priority list are taken forward in the subsequent 6-year period. 
3.6 Although public authorities are expected to take a proactive role in managing
and, where achievable, lowering flood risk, the primary responsibility for
avoiding or managing flood risk still remains with land and property owners.
The 2009 Act does not alter this. Individuals, businesses and communities
must, therefore, play a critical role in making themselves more resilient and
helping to reduce the impact of flooding.
4. Main Issues 
4.1 Bridge of Earn is located in the River Tay catchment within Potentially
Vulnerable Area (PVA) 02/08/14. 
4.2 The primary source of flooding in Bridge of Earn is fluvial (river) flooding. 
Fluvial flooding was mitigated through the construction of the Bridge of Earn
Flood Prevention Scheme in 2001 and 2006 to provide, at that time, up to a 1
in 50-year standard of protection to the areas of Sealsbridge, Burnbank,
Riverside and Earnbank from the River Earn, Yellow and Deich Burn. 
4.3 A secondary source of flooding in Bridge of Earn is pluvial (surface water)
flooding.  The term surface water flooding is often used to describe the
complex interaction of many sources of flooding as a result of rainfall run-off
flowing overland, exceedance of small urban watercourses (including
culverted watercourses) or artificial drainage systems (e.g. combined sewer),
and groundwater. 
4.4 In September 2024, consultant engineers, RSK Binnies, were engaged to
carry out a SWFS for Bridge of Earn. 
4.5 Binnie’s investigations involved extensive data gathering and analysis,
consultations, topographic surveys, a hydrological assessment, hydraulic
modelling, an environmental desk study, an options study, an economic
appraisal and the production of final reports. 
4.6 The SWFS analysed the integrated flooding mechanisms affecting Bridge of
Earn and a series of flood maps were produced – refer to Appendix 1 for the 1
in 200-year flood map (the flood event with a 0.5% chance of occurring in any
one year). This work provided a detailed understanding of surface water flood
risk across the study area and identified 3 areas at high risk of flooding
(referred to as ‘flooding hotspots’) in Kintillo, Old Edinburgh Road, and Back
Street/Deich Burn.

Page 4

The properties located in Kintillo are at risk of flooding from the combined
sewer network and surface water runoff from the topographic high points
surrounding the area. The Old Edinburgh Road properties are at risk of
flooding from surface water runoff from the west and south-east. Back Street
is at risk from surface water runoff from topographic high points to the west,
east and south and its interaction with the existing flood prevention scheme
(flood walls and embankments) which protect the area from fluvial flooding. 
4.7 The SWFS hydraulic model identified that up to 12 properties are potentially
at risk during a 1 in 30-year flood event (the flood event with a 3.33% chance
of occurring in any one year). In future this is estimated to increase to 41
properties due to the effects of climate change. A total of 32 properties are
potentially at risk during a 1 in 200-year flood event (the flood event with a
0.5% chance of occurring in any one year). In future this is estimated to
increase to 95 properties due to the effects of climate change. 
4.8 In managing flood risk, the Council is required to have regard to the
economic, social and environmental impact of its actions. The Scottish
Government’s guidance recommends that decision making in flood risk
management should be supported by an options appraisal. 
4.9 An options appraisal includes a cost-benefit analysis and other techniques to
determine whether a flood protection scheme meets its objectives, is
sustainable and represents best value for money. In general, the cost of flood
damage avoided over time must be greater than the cost of building the flood
defences, i.e., they must achieve a benefit/cost ratio of greater than 1.0. 
4.10 Binnies initially considered a long list of 83 potential actions to manage the
risk of flooding. A high-level screening exercise removed clearly unfeasible
actions leaving a short-list of 37 actions. The short-listed actions were
combined to form 14 options for further assessment.  The options were
refined by a technical, environmental and economic appraisal to produce a
preferred short-list of 7 options. Details of the seven short listed options are
shown below in Table 1 and a location plan provided in Appendix 2.

Page 5

Table 1: Preferred short-list of options
Option No Location Option Description
Option 6 Old Edinburgh Road SuDS
Option 7 Old Edinburgh Road
(through Old
Edinburgh Place)
Flood relief surface
water pipe to Deich
Burn
Option 8 Clayton Road Surface water
diversion (speed
hump)
Option 9 Forgandenny Road Upstream storage
Option 10 Back Street Flood relief SuDS to
Yellow Burn
Option 11 Forgandenny Road &
Back Street
Upstream storage and 
surface water
improvements
Option 13 Back Street New surface water
pipeline to Deich Burn 
4.11 The final short list of potential options, together with the estimated costs and
benefit/cost ratios, is shown in Appendix 2. All options have a benefit/cost
ratio greater than one and could be progressed individually. 
4.12 To improve efficiencies the report recommends options 6 and 11 are
combined into a single flood protection scheme for Bridge of Earn. The
scheme will provide varying levels of benefit to reduce surface water flood risk
in hotspots 2 (Old Edinburgh Road) and 3 (Back Street/Deich Burn) and so a
standard of protection cannot be designated. However, If the scheme was
implemented the total number of properties at risk of flooding up to the 1 in
30-year flood event would be reduced by 10, rising to 26 in the 1 in 200-year
flood event. 
4.13 The recommended scheme is estimated to have a capital project cost of
£0.49M and an overall benefit/cost ratio of 5.5. The study has, therefore,
concluded that this proposed flood protection scheme is economically viable
and should be implemented. 
4.14 The study was unable to identify an economically beneficial option for Hotspot
1 (Kintillo), mainly due to the majority of flooding being external to properties
in this area, and flood mechanisms here were highly localised to each
property meaning it was not possible to develop an economically feasible
option to collectively mitigate risk throughout the hotspot. 
4.15 The SWFS also recommends non-structural actions (e.g. promote property
flood resilience measures and formation of a flood action group) that align
with on-going actions to manage flood risk under the Tay Local FRM Plan. As
part of the 2026-27 budget, the Council has approved initial funding to support
a Property Flood Resilience Grant that residents will be able to apply for to
assist with the costs of installing these measures at their property.

Page 6

4.16 In order to disseminate the findings of the SWFS, and to outline how flood risk
is being managed in the area, a newsletter was posted to local residents and
published on the Council’s Consultation Hub
(https://consult.pkc.gov.uk/communities/bridgeofearnswfsevents/
consult_view/) during the period 2 December 2025 to 23 January 2026. The
consultation period allowed residents to view the draft outputs from the
SWFS, speak directly to council officers, design consultants and other
agencies such as Scottish Water and Scottish Flood Forum.  Residents were
encouraged to complete a comment form to provide feedback on the SWFS
recommendations. 
4.17 Community drop-in sessions were also held at Dunbarney Church Hall, Brown
Street, Bridge of Earn on Wednesday 10 December 2025 and Tuesday 13
January 2026 from 2pm to 8pm. The community drop in events were attended
by approximately 40 local residents and 31 comment forms were submitted
during the consultation period.   
4.18 The feedback received indicated residents were generally supportive of
proposed options and were keen to see some of the proposals implemented
where possible.   However, concerns were raised in relation to beaver activity,
provision of SuDS at Clayton Road, perception of increased flood risk from
future local development, maintenance of gullies and the sewer network, and
landownership in areas where options were considered.   
4.19 A ‘Question & Answer’ report addressing the main comments raised during
the consultation period was disseminated to all respondents and is available
to view on the Consultation Hub
(https://consult.pkc.gov.uk/communities/bridgeofearnswfsevents/
consult_view/). The comments raised were relevant and informative but did
not fundamentally alter the conclusion and recommendations of the SWFS.   
4.20 Surface Water Management Plans (of which this SWFS forms part) should be
monitored, reviewed and updated to align with the six-year Flood Risk
Management planning cycle. The next update is likely to be required in Cycle
3 (2028-2034).
5 Proposals 
5.1 The Council’s consulting engineers, RSK Binnies, have recommended a flood
protection scheme for Bridge of Earn. It is proposed that this scheme
benefitting up to 26 properties is taken forward by the Council. 
5.2 The proposed flood protection scheme involves the combination of options 6
and 11 as set out in paragraphs 4.12 and 4.13. 
5.3 The Council will submit details of the proposed scheme to SEPA for
prioritisation (within the national list of flood schemes) and inclusion within the
Cycle 3 Tay FRM Plan and Local FRM Plan covering the period from 2028 -
2034.

Page 7

This process is essential to secure the necessary capital grant funding to
design and construct the scheme. This process cannot be accelerated, or it
will not be eligible for Scottish Government capital funding. 
5.4 The Cycle 3 Tay Local FRM Plan should set out the proposed implementation
arrangements for the flood scheme in Bridge of Earn, including timescales
and how it will be funded. However, due to the on-going Scottish
Government/COSLA Joint Funding Working Group review of capital funding
for flood schemes, and the other schemes that the Council is already
progressing, the timescales and funding arrangements for the Bridge of Earn
flood scheme remain unclear for the time being. The next phases of work to
develop the flood scheme proposals will therefore not commence until the
funding review provides further clarity around capital grant funding and
provision is made within the Council’s capital programme.
6 Conclusion 
6.1 This report provides an update on the outcome of the Bridge of Earn SWFS. 
6.2 A SWFS was identified within the Tay Flood Risk Management Plan and
Local Flood Risk Management Plan.  The Council engaged consulting
engineers, RSK/Binnies, to deliver the SWFS. 
6.3 The Council’s consulting engineers have recommended a flood protection
scheme for Bridge of Earn that will reduce the impact of flooding for up to 26
properties. The proposed scheme is economically viable, and the preliminary
proposals consist of various measures to reduce the risk of flooding from a
combination of flood mechanisms. This report, therefore, seeks the
Committee’s approval to promote the consulting engineer’s recommended
proposals as a flood scheme for Bridge of Earn, subject to funding. 
6.4 In line with the Scottish Government’s National Flood Resilience Strategy, the
SWFS reiterates the benefits of property flood resilience measures and
recommends residents consider installing relevant measures in areas at risk
of flooding. The Council has recently approved funding for a Property Flood
Resilience Grant that will support residents with the costs of installing
appropriate measures. 
6.5 The SWFS also builds on and aligns with the Flood Risk Management Actions
centred on Community Engagement (i.e. sharing of information and advice)
and Community Resilience Groups (i.e. those community led groups
supported by the Council to develop resilience and flood protection on a local
scale).

Page 8

7. Impact and Value Assessment 
Impact and Value Assessments - Perth & Kinross Council
8. Appendices 
8.1 Appendix 1: Bridge of Earn SWFS 0.5% AEP flood map 
8.2 Appendix 2: Bridge of Earn SWFS Options and hotspots