Appendix A: Mobility Strategy Monitoring and Evaluation Plan
The Mobility Strategy and evaluation plan consists of two components: process evaluation and
outcome evaluation. Process evaluation will track delivery of the Action Plan by action owners.
Outcome evaluation will focus on monitoring the achievement of the Transport Planning Objectives
(TPOs) in accordance with the agreed indicators and baseline data outlined below. 
Process Evaluation
The Mobility Strategy includes an Action Plan, and 167 actions are currently listed to achieve the
Strategy’s TPOs. Monitoring of the Action Plan is co-ordinated through the Mobility Strategy
Working Group, using the Monitoring and Evaluation sheet appended to the main report, containing
an update from each action owner (see Appendix B).
To support the monitoring and evaluation of the Action Plan, an exercise was undertaken to sharpen
its focus for delivery. This concluded with a rationalised action list following merging or
consolidating actions containing duplication or removing those that were not specific enough. 
Some actions have been reworded, particularly where wording has become dated, while
maintaining the strategic intention. Some actions, on review, were deemed to be policy statements
rather than something that could be directly actioned. These were extracted into a list of policy
statements, which will be considered through development of Local Development Plan 3 and the
Roads Development Guide. This process has reduced the number of actions from 167 to 126. The
revised Action Plan is included in Appendix C of the main report. 
Analysis of the Action Plan shows 80% of the actions are under the direct influence of PKC. The
remaining actions are led by regional and national partners such as Tactran, Network Rail and
Transport Scotland. For these actions, PKC plays a supporting and/or influencing role, however they
are all necessary to improve the transport situation across Perth and Kinross. Although 80% of
actions are assigned to PKC as the lead action owner, a review of the scale and associated cost
highlights the strong dependence of delivery on significant funding from Scottish Government.
It is proposed that the action owners will provide annual updates on their assigned actions which
will be shared with the Climate Change and Sustainability Committee convenors. Through quarterly
meetings of the Mobility Strategy Working Group, action owners and stakeholders will engage on
opportunities for alignment, synergy and partnering.
Outcome Evaluation 
A description of the indicators and data sources identified to monitor each TPO is set out below.
Data gaps have been identified where data is not readily available, and avenues to be explored to
fill these gaps are identified. The intention is for outcome evaluation data to be updated and
reported every two years to the Climate Change and Sustainability Committee.
TPO 1: To improve the affordability of transport options across Perth and Kinross for all
This objective seeks to improve the ability of households to pay for travel without sacrificing
essential needs. Public Health Scotland warns that transport affordability is a key factor that can
place households at risk of transport poverty and public health issues. Transport poverty is an
important aspect of social and economic inclusion and is typically defined as when the cost of
travel is at least 10% of household income. This data is not currently available, and in its absence,
Appendix 1

Page 2

we will use alternative data sources from partners who are monitoring travel costs and the impacts
on households and economic hardship. 
Perth and Kinross Council, by funding bus services, is working towards providing an affordable travel
option for households but funding constraints place this work at risk. Budget constraints highlight
the limited role that PKC can play in advancing the affordability objective and points to the need
for support from Scottish Government.
TPO 1: To improve the affordability of transport options across Perth and Kinross for all
Indicator Data Set  Current Baseline
Number of residents
registered for The Scottish
National Entitlement Card
(NEC)
Cardholder data is supplied by
the National Entitlement Card
Programme Office (NECPO)
31 March 2026: 
▪ 21, 216 (Young Persons’
Free Bus Travel
Scheme) 
▪ 50, 899 (Older &
Disabled Persons’ Free
Bus Travel Scheme). 
Adults (16+) who used a local
bus service in the past month,
percentages who agreed with
each statement: 'the fares are
good value'
Scottish Household Survey
Local Authority results: Table
LA14A: Adults (16+) who used a
local bus service in the past
month, percentages who
agreed with each statement 
2024:
▪ 68% agreed that bus
fares are good value in
Perth & Kinross
% of household income spent
on transport
Data gap: no data source
available. We will work with
partners to develop data
sources as part of Transport
Scotland and Public Health
Scotland’s work on transport
poverty. 
Not applicable 
TPO 2: To improve the ability of rural communities and communities with protected
characteristics to access jobs, education and services.
This objective addresses the challenges that rural communities and people with protected
characteristics face to access jobs, education, and essential services. Our intention is thus to
monitor whether rural communities and people with protected characteristics can physically,
affordably, safely, and reliably reach jobs, education, and essential services.  The National Public
Transport Accessibility Tool (NaPTAT) data was made available for the Perth and Kinross area by
Tactran. This dataset, which is also used by Tactran  to monitor the Regional Transport Strategy’s
accessibility indicators, has provided useful data on the proportion of 16 – 24-year-olds able to
access a range of employment opportunities and further education facilities, as well as the
percentage of population in rural areas able to access various services by public transport within
30 minutes.

Page 3

Currently, a data gap identified is access for people with disabilities. This data is not readily
available and avenues for how this data is best collected will be explored with Tactran and the
Equalities Strategic Forum 
TPO 2: To improve the ability of rural communities and communities with protected
characteristics to access jobs, education and services
Indicator Data Set  Current Baseline
% of 16–24-year-olds able to
access a range of employment
opportunities within 40
mins/60 mins by public
transport 
The National Public Transport
Accessibility Tool (NaPTAT)
2023: 
▪ Within 40
minutes: 80.5% 
▪ Within 60 minutes:
63.8% 
% of 16–24-year-olds able to
access further education
facilities within 40 mins/60
mins by public transport 
The National Public Transport
Accessibility Tool (NaPTAT)
2023: 
▪ Within 40
minutes: 38% 
▪ Within 60 minutes:
74.3% 
% of population within rural
areas able to access by public
transport within
30mins/40mins/60mins: (a)
range of employment
opportunities, (b) further
education and (c) centres with
a large food store and (d) Post
Office
The National Public Transport
Accessibility Tool (NaPTAT)
2023: 30 mins
▪ Further Education:
15.7%
▪ Food Store: 41%
▪ Post Office: 78.3% 
2023: 40 mins
▪ Employment: 63.9% 
2023: 60 mins 
▪ Employment: 56.6%
▪ Further Education:
61.4%
▪ Food Store: 67.5%
▪ Post Office: 80.7% 
Ability of people with
disabilities to access jobs,
education, and services
Data gap: no data source
available. We will work with
partners and the Equalities
Strategic Forum to develop
data sources. 
Not applicable 
TPO 3: To reduce CO2 emissions produced by transport across Perth and Kinross, by reducing
car kilometres, decarbonising motorised transport and increasing the share of everyday
journeys of people and goods by sustainable and active travel modes.
Emissions from transport are one of the leading contributors to climate change and a key objective
of the Strategy is thus to reduce them. Tackling transport emissions is dependent on the transition
from fossil fuel to electric-powered vehicles, a meaningful mode shift from driving to public
transport and active travel, and a shift of freight transport to more sustainable modes. As such, the

Page 4

Mobility Strategy needs to monitor the proportion of vehicles that are electric, mode shares for
freight and everyday journeys, and vehicle miles travelled. Further, overall emissions from transport
will be monitored.
Reducing vehicle miles travelled includes reducing the amount of freight transported by road. Mode
share for freight is however identified as a data gap at this stage, and we will work with Tactran’s
Regional Freight Quality Partnership to explore this objective and the associated indicator further.
TPO 3: To reduce CO2 emissions produced by transport across Perth and Kinross, by
reducing car kilometres, decarbonising motorised transport and increasing the share of
everyday journeys of people and goods by sustainable and active travel modes
Indicator Data Set  Current Baseline
CO2 emissions from transport
in Perth and Kinross
UK local authority and regional
greenhouse gas emissions
statistics: 2005 to 2023: Table
2.1: Local authority territorial
carbon dioxide (CO2)
emissions estimates within
the scope of influence of local
authorities 2005-2023 (kt
CO2e) - Subset dataset
(Excludes large industrial sites,
railways, motorways, land-use,
livestock and soils)
Transport Total 2023: 
391.9 kt CO2e down from 398.4
kt CO2e in 2022. This figure
includes 306.4 on A-Roads
and 79.9 on minor roads.
Mode Share - Main Mode of
Travel
Scottish Household Survey:
Transport and Travel in
Scotland: Table LA16: SHS
Travel Diary - Main mode of
travel (percentages) in Perth
and Kinross: 2024
Main Mode of Travel: Perth and
Kinross (2024) 
24% Walking
54% Driver (car/ van) 
16% Passenger (car / van) 
1% Bicycle
5% Bus
1% Rail
Mode Share - Journeys to
School
Hands up Scotland Survey
(HUSS), 2025. 
HUSS 2025 for Perth and
Kinross:
39% walk
4% cycle
2% scooter/ skate
8% park & stride
24% driven
20% bus
2% taxi
Freight vehicle kilometres
travelled (VKT) travelled by
road
DfT Road Traffic Statistics 
TACTRAN
2022
Light Commercial & Heavy
Goods Vehicle: 436 million
miles travelled
Percentage of cars and vans
registered in Perth & Kinross
that are electric 
DfT Vehicle licensing statistics September 2025
2.8%
Car Kilometres Travelled in
Perth and Kinross
DfT Road Traffic Statistics 
TACTRAN
Climate KPI data
1824 million vehicle km
travelled on roads in Perth &
Kinross in 2024.
Mode share (Freight)  Data Gap We are working with Tactran’s
Regional Freight Quality

Page 5

Partnership to develop
meaningful indicators. 
TPO4: To improve climate resilience across Perth and Kinross’s transport network by reducing
the impacts caused by extreme weather events
This objective seeks to improve the way in which the transport network responds to adverse
weather events and the associated actions relate to reducing the need for road and bridge closures,
reducing the number of delayed and cancelled services, proactively assessing the transport
network for climate risk and implementing resilience interventions. 
As part of the PKC Climate Change Strategy and Action Plan, the number of road closures due to
weather events is being monitored, and data sources to monitor climate risk for PKC assets will
largely be developed in-house through formal recording and reporting processes. Rail service
delays will be monitored using Network Rail’s reports on delays and cancellations due to adverse
weather. This data is sourced via Tactran.
TPO4: To improve climate resilience across Perth and Kinross’s transport network by
reducing the impacts caused by extreme weather events
Indicator Data Set  Current Baseline
Number of public road
closures due to flooding or
other climate change impacts
Internal (RMP) - Climate
Change Resilience indicator
99 in 2023/24
Indicator under development
relating to PKC assets
assessed for climate risk
(proactively) 
Data source under
development in consultation
with the Roads Authority
(Structures). 
Not applicable
Number of rail services
cancelled/ delayed due to
adverse weather
Network Rail performance
data sourced via Tactran 
2024
▪ Glasgow – Aberdeen
Line: 15 cancelled, 10
part-cancelled, 186
failures
▪ Glasgow/ Edinburgh –
Perth/ Inverness: 45
cancelled, 10 part-
cancelled, 193 failures 
TPO 5: To support economic growth by improving the reliability and efficiency of Perth and
Kinross’s transport network.
Reliable journey times are a key component of economic efficiency, and this objective will be
monitored by measuring bus, rail, and general road network journey time reliability. Ideally,
indicators would monitor deviations from scheduled arrival and departure times for public
transport, and congestion, queuing and delays on the road network. 
Bus journey time reliability is a data gap at this stage, and the PKC Public Transport Unit (PTU) is
working to secure comprehensive data from operators, which is a requirement of our supported
service contracts. For rail services, Scotrail’s annual on-time arrival at destination figures will be
utilised. Scotrail’s Public Performance Measure (PPM) is the standard measure for train service

Page 6

performance throughout the UK and includes two elements – punctuality and reliability. Current
figures suggest that the percentage of ScotRail services that arrive or terminate at Perth within 5
minutes of their booked arrival time is 86.3%, compared with Glasgow Queen Street (89.1%) and
Edinburgh (88.7%).
To monitor journey time reliability by road, PKC is currently in the process of procuring a TomTom
licence to be in a position to monitor free-flow and congestion conditions, and to highlight key
hotspots for interventions to improve traffic flow.
TPO 5: To support economic growth by improving the reliability and efficiency of Perth and
Kinross’s transport network
Indicator Data Set  Current Baseline
Bus journey time reliability Data source under
development.  Bus journey
time reliability is a data gap at
this stage, and the Public
Transport Unit (PTU) is working
to secure comprehensive data
from operators.
Not applicable.
Rail journey time reliability Scotrail annual on-time arrival
at destination - available for
Perth
2026
Perth - The percentage of
ScotRail services that arrive or
terminate at this location
within 5 minutes of their
booked arrival time - 86.4%
Road journey time reliability
and congestion on key
economic road network
corridors – indicator under
development.
After procuring a TomTom
licence, we will be in a position
to develop a suitable indicator
and dataset. 
Not applicable
Indicator under development:
bus and rail service
integration.
Data source under
development.
Not applicable 
TPO 6: To support local development that encourages and facilitates local living and
sustainable access, across Perth and Kinross, by achieving an increased active travel and
public transport mode split to and from new developments.
National Planning Framework 4, policy 13 (f) specifies that development proposals for significant
travel generating uses, or smaller-scale developments where it is important to monitor travel
patterns resulting from the development, will only be supported if they are accompanied by a Travel
Plan with supporting planning conditions/obligations. Travel plans should set out clear
arrangements for delivering against transport mode share targets, as well as monitoring and
evaluation, which would produce mode share data.
At present, this is a data gap and the requirement for monitoring of travel plans requires
strengthening and this will be addressed through the LDP3 and internal development management
processes.

Page 7

TPO 6: To support local development that encourages and facilitates local living and
sustainable access, across Perth and Kinross, by achieving an increased active travel and
public transport mode split to and from new developments
Indicator Data Set  Current Baseline
Mode share for selected new
developments.
Data Gap Not applicable 
TPO 7: To improve the capacity and reliability of alternative sustainable freight and logistic
modes across Perth and Kinross
To encourage sustainable movement of freight, the Mobility Strategy seeks to enhance the capacity
of vehicles and logistics centres – fundamentally impacting on the efficiency and cost of
sustainable freight movements. While this is not directly under the influence of PKC, we will seek to
partner with stakeholders to enable a meaningful mode shift. The indicator for this objective is
currently under development, and the intention is to explore data sources related to sustainable
freight capacity, e.g., EV vans, cargo bikes, consolidation centres, and zero-emission last mile
solutions. There is very limited data on freight publicly available, and we intend to progress
developing the indicator and data sources through Tactran’s Regional Freight Quality Partnership
which will resume later this financial year.
TPO 7: To improve the capacity and reliability of alternative sustainable freight and logistic
modes across Perth and Kinross
Indicator Data Set  Current Baseline
Indicator under development. No appropriate data source
has been identified; therefore,
no indicator has been
developed. We are engaging
with partners on the
development of indicators for
the local area and the region. 
Not applicable 
TPO 8: To improve labour market access through sustainable transport, active travel, and
digital opportunities, to and from Perth and Kinross.
The Mobility Strategy seeks to connect employers with the labour market through sustainable
means by ensuring that the necessary public transport, active travel, and digital connectivity
opportunities are available. The objective relates to both supporting employers within the Perth
and Kinross area to secure the necessary labour and also supporting employers outwith Perth and
Kinross to secure labour from the PKC area.
We will seek to undertake spatial and transport accessibility analysis of key employment centres
with the location of employees and job seekers. The indicator for this is currently under
development due to the complexity of the modelling required. However, a proxy has been identified
from the National Public Transport Accessibility Tool (NaPTAT) made available by Tactran. This data
assesses the percentage of regional jobs accessible within 60 minutes by public transport for Perth
and Kinross residents.

Page 8

Digital connectivity is recognised as a highly impactful way to reduce non-discretionary travel
where there are suitable digital opportunities available. Digital opportunities for work, retail, and
accessing services requires that the necessary digital infrastructure is in place and accessible to
businesses, households, and service providers. The Strategy proposes to monitor internet speeds
and coverage in the region using UK Parliament constituency statistics for broadband coverage and
speeds.
TPO 8: To improve labour market access through sustainable transport, active travel, and
digital opportunities, to and from Perth and Kinross
Indicator Data Set  Current Baseline
Availability of broadband
coverage.
PKC-wide data from Ofcom  2025:
▪ Superfast availability
91.5%
▪ Gigabit availability
57.6%
▪ Unable to receive
decent broadband
0.7% 
% of regional jobs accessible
within 60 minutes by public
transport
The National Public Transport
Accessibility Tool (NaPTAT)
2023:
59% of regional jobs are
accessible within 60 mins by
public transport 
TPO 9: To improve road safety and perceived safety for all transport users across Perth and
Kinross.
Scotland’s ambition is to have zero fatalities and serious injuries on Scotland's roads by 2050, and
the Mobility Strategy seeks to promote a safer transport network in Perth and Kinross. By
implementing measures such as reducing speeds to 20mph in residential areas and implementing
safe road design, we can improve road safety outcomes in Perth and Kinross.   
Transport Scotland data will be utilised to monitor killed and seriously injured (KSI) road safety data
for Perth and Kinross. Further, the Walk, Wheel, Cycle Trust (formerly Sustrans) has recently
produced the results of the Walking and Cycling Index for Perth (2025). This is a biennial publication
that uses a representative sample to determine perceptions of safety, and this will be used as a
key Mobility Strategy indicator.
TPO 9: To improve road safety and perceived safety for all transport users across Perth and
Kinross
Indicator Data Set  Current Baseline
▪ Total number of
people killed or
seriously injured (KSI)
on roads in PKC 
▪ Total number of
children killed or
seriously injured (KSI)
on roads in PKC
Transport Scotland road
safety data for Perth and
Kinross (Local authority code
819, S12000024) 
2024 
▪ Total KSI = 96 
▪ Child KSI = 7

Page 9

Perceived safety - Proportion
of residents who think walking
and wheeling safety is good
Walking & Cycling Index
(Perth)
2024: 77% of residents think
it’s safe to walk or wheel in
their local area, compared to
67% in 2023. 
2024: 56% of residents think
it’s safe for children to walk or
wheel in their local area,
compared to 52% in 2023.
Perceived safety - Proportion
of residents who think cycling
safety is good
Walking & Cycling Index
(Perth)
2024: 48% of residents think
it’s safe to cycle in their local
area, compared to 40% in
2023. 
2024: 36% of residents think
it’s safe for children to cycle in
their local area, compared to
34% in 2023. 
TPO 10: To improve physical and mental health within Perth and Kinross through walking,
wheeling and cycling.
Active travel is strongly associated with improvements in physical and mental health. The Mobility
Strategy thus seeks to encourage improved levels of active travel, recognising the role that active
travel plays in public health outcomes. Given that there is established evidence for the benefits of
walking and cycling for health, the proposed indicator is the share of journeys made by active travel
using data from the Scottish Household Survey. The indicator has been proposed in consultation
with NHS Tayside, Tactran, and Public Health Scotland.
According to the 2025 Walking and Cycling Index for Perth, the physical activity of walking prevents
33 early deaths annually, and walking and wheeling in the city prevents 144 serious long-term health
conditions each year. 
TPO 10: To improve physical; and mental health within Perth and Kinross through walking,
wheeling and cycling
Indicator Data Set  Current Baseline
Percentage of adult journeys
travelling by either cycling or
walking. 
Scottish Household Survey. 2024:
25% journeys by walking or
cycling.
Number of early deaths and
serious long-term health
conditions prevented annually
Walking & Cycling Index
(Perth)
2025
The physical activity of
walking in Perth prevents 33
early deaths annually, and
walking and wheeling in the
city prevents 144 serious long-
term health conditions each
year

Page 10

TPO 11: To improve air quality across Perth and Kinross’s road network by achieving revocation
of both Air Quality Management Areas and reducing preventable pollutants
Air pollution remains the single largest environmental health risk in the United Kingdom, with
emissions from transport being a key contributor. While there has been a generally consistent
downward trend in both nitrogen dioxide (NO2) and Particulate Matter (PM10 and PM2.5) within the
Perth AQMA since 2009, the most recent air quality modelling of Perth still identifies pollutant
hotspots with borderline objective compliance. For example, while there has not been an
exceedance of the NO2 objective in Perth since 2018, levels are still high in hotspots, with Atholl
Street recording the second highest NO2 levels in Scotland in 2023.
To monitor this objective, indicators will include the number of monitoring sites with exceedance
of the annual mean, as well as the number of monitoring sites where the annual mean is increasing
and decreasing. There are 75 monitoring sites providing good coverage of the PKC road network, 71
are diffusion tubes which only monitor NO2, 4 in Perth are Real Time Monitors which continuously
record data for NO2, PM10 and PM2.5. Data sources have been developed in partnership with PKC
Environmental Health. It should also be noted that following the procurement of Paramics traffic
modelling software, PKC is in an improved position to monitor emissions from transport. 
TPO 11: To improve air quality across Perth and Kinross’s road network by achieving
revocation of both Air Quality Management Areas and reducing preventable pollutants
Indicator Data Set  Current Baseline
Number of monitoring sites
where the annual mean air
pollutant levels exceed
national objectives
Council Annual Air Quality
Monitoring.
2025 
No annual mean exceedances for
NO2 (75 sites) or PM10/PM2.5 (4
sites) 
Number of monitoring sites
where annual mean air
pollutant levels are
increasing & decreasing
Council Annual Air Quality
Monitoring.
2025 
For NO2 (75 sites) 
Increasing (9), Decreasing (61), No
Change (2), Not applicable, first
year in place (3) 
  
For PM10 & PM2.5, interim figures to
be adjusted (4 sites) 
Increasing (3), Decreasing (1)