Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Climate Change and Sustainability Committee 
Date of Meeting: 27 May 2026 
Report Title: Mobility Strategy 18 Month Review 
Report Number: 26/144 
Report Author: Matthew Davis, Lead Officer Mobility Strategy & 
Carlyn Morilly, Transportation Development Officer 
Organisational Lead: Serge Merone, Strategic Lead - Economy,
Development & Planning
___________________________________________________________________
1. Purpose 
1.1 The purpose of this report is to update Members on the delivery of the Mobility
Strategy, to present a draft Monitoring and Evaluation Plan and a draft revised
Action Plan for approval, and to request approval to commence engagement
on Mobility Strategy action 2, relating to Perth Transport Futures City Centre. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the updates provided on the delivery of the Mobility Strategy and Action
Plan
2.2 Approves the Mobility Strategy Monitoring and Evaluation Plan (Appendix A)

Page 2

2.3 Approves the revised Action Plan (Appendix C) and removal of 41 actions 
2.4 Approves the Perth Transport Futures City Centre Engagement Plan
(Appendix D) and its commencement  
3. Background/Context 
3.1 The Mobility Strategy is Perth & Kinross Council’s (PKC) Local Transport
Strategy which was approved by the Climate Change and Sustainability
Committee on 23 October 2024 and covers the period 2025-2040. 
3.2 A Mobility Strategy was identified in the PKC Corporate Plan (2022-27) as a
key strategy to help deliver two Corporate Plan priorities: tackling climate
change; and delivering a stronger and greener economy. Developing the
strategy also delivered on transport action T1 in the Council’s Climate Change
Strategy and Action Plan (adopted 2021).  
3.3 Taking climate action is a key theme of the Mobility Strategy, along with
reducing inequalities, delivering inclusive economic growth and improving our
health and wellbeing, which are all aligned with the National Transport
Strategy (NTS). The Mobility Strategy’s 11 Transport Planning Objectives
describe the desired outcomes under each of these four themes. The NTS
themes and transport planning objectives are included in Table 1 below. 
Table 1: Transport Planning Objectives and alignment with National Transport
Strategy priorities 
3.4 From the 11 objectives, actions were developed which were assessed as
performing well against the strategy’s objectives, alongside deliverability
considerations and alignment with national transport policy. This forms the
strategic case for the programme of work set out in the Action Plan.
NTS2 Priorities TPO  PKC - Transport Planning Objectives 
Reduces
Inequalities 
1 To improve the affordability of transport options across Perth and Kinross for all 
2 To improve the ability of rural communities and communities with protected characteristics to
access jobs, education and services 
Takes Climate
Action
3
To reduce CO2 emissions produced by transport across Perth and Kinross, by reducing car
kilometres, decarbonising motorised transport and increasing the share of everyday journeys of
people and goods by sustainable and active travel modes   
4 To improve climate resilience across Perth and Kinross's transport network by reducing the
impacts caused by extreme weather events 
Helps Deliver
Inclusive
Economic
Growth
5 To support economic growth by improving the reliability and efficiency of Perth and Kinross's
transport network   
6
To support local development that encourages and facilitates local living and sustainable access,
across Perth and Kinross, by achieving an increased active travel and public transport mode split
to and from new developments 
7 To improve the capacity and reliability of alternative sustainable freight and logistic modes
across Perth and Kinross  
8 To improve labour market access through sustainable transport, active travel, and digital
opportunities, to and from Perth and Kinross  
Improves our
Health and
Wellbeing 
9 To improve road safety and perceived safety for all transport users across Perth and Kinross     
10 To improve physical and mental health within Perth and Kinross through walking, wheeling and
cycling  
11 To improve air quality across Perth & Kinross's road network by achieving revocation of both Air
Quality Management Areas and reducing preventable pollutants

Page 3

3.5 Since approval of the Mobility Strategy, actions have been assigned to leads
within PKC and the Mobility Strategy Working Group established to co-
ordinate delivery across departments. This work has enabled a Monitoring
and Evaluation Plan to be developed. 
3.6 In the Climate Change Annual Report to Full Council on 25 February 2026, it
was noted that the transport KPIs would be reviewed and amended in the
next 6 months, as part of developing a monitoring framework for the Mobility
Strategy. The Mobility Strategy Climate theme indicators outlined in this report
are proposed to be included as transport KPIs for the Climate Change
Strategy. 
3.7 A key action from the Mobility Strategy relates to delivering the city centre
improvements envisaged under Phase 4 of Perth Transport Futures
Programme. Action 2 states “Make improvements within the Perth City Centre
ring road to reduce car dominance and improve sustainable and active travel
choices. Improvements may consider: parking and road space reallocation,
traffic management arrangements, connecting services, and placemaking to
optimise traffic flows and the space available, and improve sustainable and
active travel choices to reduce congestion and local emissions”. 
3.8 The expected reduction in city centre traffic following the opening of the Cross
Tay Link Road in March 2025, created the opportunity to reallocate road
space to make city centre improvements without significant negative traffic
impacts. 
3.9 A feasibility study commenced in 2024 to test this, entitled “Perth Circulation
Plan”, which models the Perth City centre transport network operation with
reduced provision for cross-city through traffic and enhanced networks for
sustainable and active travel. An all-Member briefing was held on 27 May
2025. 
3.10 The resulting conceptual plan is supported by traffic modelling which shows
that the aspired changes to the city centre are broadly feasible (i.e. can be
made without undue negative impacts on traffic flow).
4. Main Issues 
4.1 In the 18 months since the Mobility Strategy was approved, progress has
been made on delivering a range of actions. Key highlights include: 
• Progression with Perth Transport Futures through the opening of the
Cross Tay Link Road and Destiny Bridge (Phase 2) and completion of a
feasibility study for Perth Transport Futures City Centre (Phase 4). 
The Bertha Park Link Road (Phase 3) is nearing completion and is likely
to open mid to late June 2026.
• The Electric Vehicle Infrastructure Fund (EVIF) Strategy and Action Plan
is complete. Funding for new charge points has been secured, and
installation and maintenance will be transferred to a private operator,
with implementation expected to commence towards the end of 2026/27.

Page 4

• In 2024/25 PKC achieved a 100% delivery rate for level two Bikeability
training in participating Primary Schools.
• PKC has procured Traffic Modelling Software, allowing us to undertake
some traffic modelling work in-house. This will allow us to model, for
example, the impact of proposed LDP sites.
• Significant expansion of 20mph speed limit streets on local and trunk
roads has taken place, in accordance with Transport Scotland’s 20mph
strategy.
• Consultants are developing a new concept design and business case for
the Dunkeld Road Corridor integrating bus priority and active travel,
funded via Transport Scotland’s Bus Infrastructure Fund (BIF).
• Investigative work is on-going into Park & Ride site usage and options
for additional facilities in Perth and Kinross.
• The Council’s Transport Transformation Project is reviewing bus powers
available to PKC under the Transport (Scotland) Act 2019 along with
options for future bus network provision. The Outline Business Case is
due to be presented to Full Council on 2nd September 2026. 
4.2 A Monitoring and Evaluation Plan has been developed containing two
sections:  process and outcome evaluation (Appendix A). The former tracks
delivery of the Action Plan (i.e. the outputs) The latter determines the extent to
which the Mobility Strategy’s 11 objectives are being achieved through a
series of indicators. 
Process Evaluation 
4.3  The Mobility Strategy includes an Action Plan and 167 actions are currently
listed to achieve the Strategy’s Transport Planning Objectives. Monitoring of
the Action Plan is co-ordinated through the Mobility Strategy Working Group
using the Monitoring and Evaluation sheet appended to this report, containing
an update from each action owner (Appendix B).   
4.4 Four actions have been completed to date and work has commenced on 132
actions. The completed actions are: 
• action 28, develop an asset management platform to highlight road
network status;
• action 36, implement and enforce pavement parking ban;
• action 57, free bus travel during the run up to Christmas and on the first
Saturday of the month;
• action 86, safeguard land for Park & Ride development in the local
development plan. 
4.5 Analysis of the Action Plan shows 80% of the actions are under the direct
influence of PKC. The remaining actions are led by regional and national
partners such as Tactran, Network Rail and Transport Scotland. For these
actions PKC plays a supporting and/or influencing role, however they are all
necessary to improve the transport situation across Perth and Kinross.

Page 5

Although 80% of the actions are assigned to PKC as the action owner, an
initial review of the scale of work and associated cost highlights that delivery
is strongly dependent on securing external financial support from Scottish
Government. 
4.6 To support the monitoring and evaluation of the Action Plan, an exercise was
undertaken to sharpen its focus for delivery. This concluded with a
rationalised list which involved merging or consolidating actions containing
duplication or removing those that were not specific enough.  Some actions
have been reworded, particularly where wording has become dated, while
maintaining the strategic intention. 
4.7 Some actions, on review, were deemed to be policy statements rather than
something that could be directly actioned. These were extracted into a list of
policy statements (Appendix E), which will be considered for incorporation into
PKC policies and guidelines, such as Local Development Plan 3 and the
Roads Development Guide. 
4.8 This process has reduced the number of actions from 167 to 126. The
resulting list of Actions has been re-numbered sequentially. Actions
referenced in this report are using the new numbering. The revised Action
Plan is included in Appendix C. 
Outcome Evaluation 
4.9 Transport Planning Objectives were developed, in accordance with Transport
Scotland guidance, which define the changes that PKC are working towards.
Their achievement will be influenced by Mobility Strategy Action Plan delivery
as well as wider societal factors that are out with the control of the Council. 
4.10 Having reviewed the Transport Planning Objectives, indicators have been
developed to provide a meaningful indication of whether, and to what extent,
the Mobility Strategy’s actions are advancing the objectives. The indicators
rely on the availability of reliable and relevant datasets. The Regional
Transport Partnership, Tactran, was consulted to provide expertise on
selecting appropriate indicators and datasets, as well as to advise on where
legitimate data gaps exist. Where data gaps exist, proxy indicators have been
proposed until such time as more relevant data can be sourced or collected.
The rationale for indicator and data selection, remaining data gaps and
proposals to fill them is detailed in Appendix A. 
4.11 A summary of the proposed indicators is set out in Table 2 below. As noted
above, the indicators for Transport Planning Objective 3 will also be included
as Transport KPIs for the Climate Change Strategy. Most of the required
baseline data has been collected. Key areas where data is missing are for
freight volumes moved by sustainable modes of transport and modal share
data for new developments. The data sources used are currently updated
annually or biennially.

Page 6

Transport Planning Objective Indicator Baseline
1) To improve the affordability of
transport options across Perth
and Kinross for all
Number of residents
registered for The
Scottish National
Entitlement Card (NEC)
31 March 2026
▪ 21,216 (Young
Persons’ Free Bus
Travel Scheme) 
▪ 50,899 (Older &
Disabled Persons’
Free Bus Travel
Scheme).
Adults who used a local
bus service in the past
month, percentage who
agreed 'the fares are
good value'
2024
68% agreed that bus fares
are good value
2) To improve the ability of rural
communities and communities
with protected characteristics to
access jobs, education and
services
% of 16-24 year olds
able to access a range of
employment
opportunities within 40
mins/60 mins by public
transport
2023:
Within 40 minutes: 80.5%
Within 60 minutes: 63.8%
% of 16-24 year olds
able to access further
education facilities within
30 mins/60 mins by
public transport
2023:
Within 30 minutes: 38%
Within 60 minutes: 74.3%
% of population within
rural areas able to
access by public
transport within
30mins/40mins/60mins:
(a) range of employment
opportunities, (b) further
education and (c)
centres with a large food
store and (d) Post Office
2023: 30 mins
Further Education: 15.7%
Food Store: 41%
Post Office: 78.3% 
2023: 40 mins
Employment: 63.9% 
2023: 60 mins 
Employment: 56.6%
Further Education: 61.4%
Food Store: 67.5%
Post Office: 80.7%
3) To reduce CO2 emissions
produced by transport across
Perth and Kinross, by reducing
car kilometres, decarbonising
motorised transport and
increasing the share of
everyday journeys of people
and goods by sustainable and
active travel modes
CO2 emissions from
transport in Perth and
Kinross
2023/24
493.8 kt CO2e 
Mode Share – All
Journey Types 
2024
24% Walking
54% Driver (car/ van) 
16% Passenger (car / van) 
1% Bicycle
5% Bus
1% Rail
Mode Share – Child
Journeys to School 
2025
39% walk
4% cycle
2% scooter/ skate
8% park & stride
24% driven
20% bus
2% taxi
Car kilometres travelled  2024/25
1824 million vehicle
kilometres

Page 7

Percentage of cars and
vans that are electric
2025
2.8%*
Sustainable Freight
Mode Share
Data source under
development
4) To improve climate resilience
across Perth and Kinross’s
transport network by reducing
the impacts caused by extreme
weather events
Number of public road
closures due to flooding
or other climate change
impacts
2023/24
99
Rail services cancelled/
delayed due to adverse
weather
2024 
• Glasgow – Aberdeen
Line: 15 cancelled, 10
part-cancelled, 186
failures
• Glasgow/ Edinburgh –
Perth/ Inverness: 45
cancelled, 10 part-
cancelled, 193 failures
5) To support economic growth
by improving the reliability and
efficiency of Perth and Kinross’s
transport network
Rail journey time
reliability
Annual average Feb 25 –
Feb 26
86.4% of ScotRail services
arrived or terminated at
Perth Station within 5
minutes of their booked
arrival time
Bus journey time
reliability
Data source under
development
Road journey time
reliability and congestion
on key economic road
network corridors
Data source under
development
Bus/rail service
integration
Data source under
development
6) To support local development
that encourages and facilitates
local living and sustainable
access, across Perth and
Kinross, by achieving an
increased active travel and
public transport mode split to
and from new developments
Mode share for selected
new developments.
Data Gap
7) To improve the capacity and
reliability of alternative
sustainable freight and logistic
modes across Perth and
Kinross
Indicator under
development
Data Gap
8) To improve labour market
access through sustainable
transport, active travel, and
digital opportunities, to and from
Perth and Kinross
PKC Broadband
coverage
2025
Superfast availability 91.5%
Gigabit availability 57.6%
Unable to receive decent
broadband 0.7%
% of regional jobs
accessible within 60
minutes by public
transport
2023
59% of regional jobs are
accessible within 60 mins
by public transport for Perth
and Kinross residents.
9) To improve road safety and
perceived safety for all transport
users across Perth and Kinross
• Total number of
people killed or
seriously injured
2024
Total KSI = 96
Child KSI = 7

Page 8

(KSI) on roads in
PKC
• Total number of
children killed or
seriously injured
(KSI) on roads in
PKC
Perceived safety -
walking and wheeling
2024
• 77% of residents think
it’s safe to walk or
wheel in their local area
• 56% of residents think
it’s safe for children to
walk or wheel in their
local area
Perceived safety -
cycling
2024
• 48% of residents think
it’s safe to cycle in their
local area
• 36% of residents think
it’s safe for children to
cycle in their local area,
compared to 34% in
2023.
10) To improve physical; and
mental health within Perth and
Kinross through walking,
wheeling and cycling
Percentage of adult
journeys travelling by
either cycling or walking.
2024
25% journeys by walking or
cycling 
Number of early deaths
and serious long-term
health conditions
prevented annually
2025
The physical activity of
walking prevents 33 early
deaths annually, and
walking and wheeling in the
city prevents 144 serious
long-term health conditions
each year
11) To improve air quality
across Perth and Kinross’s road
network by achieving revocation
of both Air Quality Management
Areas and reducing preventable
pollutants
Number of monitoring
sites where the annual
mean air pollutant levels
exceed national
objectives
2025
No annual mean
exceedances for NO2 (75
sites) or PM10/PM2.5 (4 sites) 
Number of monitoring
sites where annual mean
air pollutant levels are
increasing & decreasing
2025 
For NO2 (75 sites)
Increasing (9), Decreasing
(61), No Change (2), N/A
first year in place (3)  
For PM10 & PM2.5, interim
figures to be adjusted (4
sites)
Increasing(3),
Decreasing(1)
* The national dataset from the Department for Transport is likely to be an underestimate, see
Monitoring and Evaluation Plan for details.
Table 2: Indicators proposed to monitor the Transport Planning Objectives, along
with baseline data

Page 9

5. Proposals 
Mobility Strategy Reporting 
5.1 Given the 15-year lifespan of the Mobility Strategy it is proposed that a report
is brought back to this Committee every 2 years, detailing progress delivering
the Mobility Strategy and achievement of objectives. Transport will continue to
feed into the climate change annual reporting utilising the new KPIs outlined
in this report. 
5.2 During the next reporting period work will continue with Tactran, seeking to fill
data gaps in the outcome evaluation process, working towards a complete
suite of indicators to monitor the strategy’s objectives. 
Perth Transport Futures City Centre Plan 
5.3 As noted above, a conceptual plan has been developed for Perth Transport
Futures City Centre, which shows that the proposed changes are broadly
feasible. The study area is shown in Figure 1. 
Figure 1: Perth Transport Futures City Centre Study Area 
5.4 However the observed city centre traffic reductions, which this plan makes
use of, will not last indefinitely. This is because in areas of high travel
demand, traffic volumes usually increase over time to fill available road space.
Hence there is a degree of urgency to begin implementing the Perth Transport
Futures City Centre Plan.

Page 10

5.5 To prepare for this, engagement is now required to refine the conceptual plan
and add in detail to create a deliverable proposal. Approval to commence
engagement with residents, visitors, businesses and other stakeholders over
the next 12 months is recommended by this report and an engagement plan is
included in Appendix D. 
5.6 The purpose of the engagement is to: 
• Inform people what Perth Transport Futures City Centre Plan is and why
it is being proposed
• Consult on the level of support for key principles underpinning the plan
and the trade-offs that will be required to implement it 
5.7 The engagement plan is being developed in line with best practice outlined in
the National Standards for Community Engagement. 
5.8 Proposed engagement methods include an online survey supplemented by
market research to ensure a representative sample, focus groups of seldom
heard and underrepresented groups and stakeholder workshops. 
5.9 There is also the potential to trial measures from the Plan as part of major city
centre projects that come forward over the next few years and monitor their
effectiveness. 
5.10 Perth Transport Futures City Centre project delivery will be planned and co-
ordinated with the wider programme of city centre projects programmed over
the next few years, including the bridges maintenance and associated traffic
management as well as other engagement activities such as around public
transport. 
5.11 Additionally it should be noted that Mobility Strategy action 126 looks to make
similar improvements within town and village centres, so the learning from
Perth will be applied to shaping proposals that will be developed in other
settlements.
6. Conclusion   
6.1 The Mobility Strategy Monitoring and Evaluation Plan will ensure that the
Council is fully informed regarding progress with delivering the Strategy and
will measure the extent to which delivery is achieving the objectives. This is
supported by a revised Action Plan that will be easier to read and contain less
overlaps between actions. 
6.2 Commencing engagement on Mobility Strategy action 2, Perth Transport
Futures City Centre, will allow proposals to be refined by public and
stakeholder feedback. There is a degree of urgency for developing and
trialling measures in the city centre, because traffic reductions following
opening the Cross Tay Link Road are likely to be transient and delays risk
missing the opportunity to take advantage of them.

Page 11

7. Impact Value Assessment 
Mobility Strategy 18 Month Review
8. Appendices 
8.1 Appendix A: Monitoring and Evaluation Plan 
8.2 Appendix B: Action Plan Progress Update 
8.3 Appendix C: Revised Action Plan 
8.4 Appendix D: Perth Transport Futures City Centre Engagement Plan  
8.5 Appendix E: List of Policy Statements