Agenda Document Pack - Climate Change and Sustainability Committee - 18/02/2026

Perth and Kinross Council · 18 February 2026
Back to Climate Change and Sustainability Committee — 18 February 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity
Our vision is for
a Perth and Kinross where everyone can live life
well, free from poverty and inequality
Council Building
2 High Street
Perth
PH1 5PH
11/02/2026
A hybrid meeting of the Climate Change and Sustainability Committee will be
held in the Council Chamber on Wednesday, 18 February 2026 at 13:00.
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk.
THOMAS GLEN
Chief Executive
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode.
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting.
Members:
Councillor Richard Watters  (Convener)
Councillor Liz Barrett  (Vice-Convener)
Councillor Hugh Anderson
Councillor Andy Chan
Councillor Ken Harvey
Councillor David Illingworth
Councillor Noah Khogali
Councillor Grant Laing
Depute Provost Andrew Parrott
Councillor Grant Stewart
Councillor Jack Welch
Page 1 of 86

Page 2

Page 2 of 86

Page 3

Climate Change and Sustainability Committee
Wednesday, 18 February 2026
Agenda
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct.
1 WELCOME AND APOLOGIES
2 DECLARATIONS OF INTEREST
3 MINUTE OF MEETING OF CLIMATE CHANGE AND
SUSTAINABILITY COMMITTEE OF 10 NOVEMBER 2025 FOR
APPROVAL
(copy herewith)
5 - 8
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 26/44)
9 - 10
5 THE PERTH AND KINROSS CIRCULAR ECONOMY STRATEGY
2026-2031
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 26/45)
11 - 50
6 TREE PLANTING POLICY
Report by Strategic Lead - Housing and Communities (copy
herewith 26/46)
51 - 86
Page 3 of 86

Page 4

Page 4 of 86

Page 5

DRAFT
Climate Change and Sustainability Committee
Minute of hybrid meeting of the Climate Change and Sustainability Committee held
in the Council Chambers on 10 November 2025 at 9.30am.
Present: Councillors R Watters, L Barrett, H Anderson, A Chan, D Illingworth,
K Harvey, N Khogali, G Laing, I MacPherson (substituting for Councillor J Welch),
A Parrott and G Stewart.
In Attendance: C Mailer, Depute Chief Executive; F Crofts, Strategic Lead –
Environment and Infrastructure; S Merone, Strategic Lead – Economy, Development
and Planning; D Stubbs and S Whyte (Housing & Communities) (both up to and
including Item 5), G Key and N Lennon (Property Services); P Leonard, D Grant, S
McLaren, E Kourtesi (up to and including Item 7), R Stewart, R Haynes (all
Environment and Infrastructure); S Hendry, A Taylor, A Brown and M Pasternak (all
Legal and Governance).
Apology for absence: Councillor J Welch.
Councillor R Watters, Convener, Presiding.
The Convener led on Items 1-4, and 6, with Vice-Convener L Barrett on Items 5 and
8.
1. Welcome And Apologies
Councillor Watters welcomed everyone to the meeting.  An apology for
absence was noted as above.
2. Declarations Of Interest
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct.
3. Minute Of Meeting of Climate Change and Sustainability Committee of 20
August 2025
The minute of meeting of Climate Change and Sustainability Committee of
20 August 2025 was submitted and approved as correct record.
4. Outstanding Business Statement
Resolved:
The status of actions in the Outstanding Business Statement, be noted and
completed actions removed accordingly
5. Perth and Kinross Outdoor Access Forum Annual Report 2024-25
There was submitted a report by Strategic Lead – Housing and Communities
(25/301) summarising the activities and progress of the Perth and Kinross Outdoor
3
Page 5 of 86

Page 6

DRAFT
Access Forum over the last year and recommending the appointment of two new
members to the Forum.
Resolved:
(i) The appointment of two new members as detailed in Appendix 1 to Report
25/301 for a period of four years, be approved.
(ii) It be noted that the remaining members be retained in their appointments for
at least a further year as set out in Appendix 1 to Report 25/301.
(iii) It be delegated to the Strategic Lead (Housing & Communities) to fill any
casual vacancy arising during this period through recruitment by Forum
members, as detailed within the Forum’s Terms of Reference.
(iv) The contribution of one retiring member, the activities and progress of the
Forum since October 2024 and the ongoing commitment to maximise effective
partnership working to make the best of the exceptional landscapes, paths
networks and access rights for all within Perth and Kinross, be noted.
(v) The progress in reviewing the working relationship between the Council and
Forum and the possible need to bring proposals for any formal changes to a
future committee, be noted.
6. Annual update on the delivery plan (2024-2029) for Perth & Kinross
Local Heat & Energy Efficiency Strategy and Local Area Energy Plan
(2024-2045)
There was submitted a report by Strategic Lead – Economy, Development
and Planning (25/297) providing details on the progress in implementing the Delivery
Plan (2024-2029) for the Local Heat & Energy Efficiency Strategy (LHEES) and
Local Area Energy Plan (LAEP) (2024-2045) and seeking approval of the priorities
for the next twelve months.
(There Followed a Brief Recess and the Meeting Reconvened at 10.23am).
Resolved:
(i) The progress made during the last year towards the outcomes set out with the
Local Heat & Energy Efficiency Strategy (LHEES) and Local Area Energy
Plan (LAEP) (2024-2045), be noted.
(ii) The LAEP priorities for the next 12 months, as detailed in Section 7 of Report
25/297, be approved.
7. Public Bodies Climate Change Duties Compliance Reporting 2025 –
Carbon Emissions
There was submitted a report by Strategic Lead – Environment and
Infrastructure (25/298) providing scrutiny of the Council’s statutory annual Public
Sector Climate Change Reporting Duty submission and including an update on the
Council’s carbon footprint and emissions trends for the reporting year 2024/25
financial year, and wider actions the Council is taking to address the Climate
Emergency.
Resolved:
Page 6 of 86

Page 7

DRAFT
(i) The contents of the report, along with the updated report to the Scottish
Government as detailed in Appendix A to Report 25/298, be noted.
(ii) The top 5 priorities for both Climate Governance and Climate Adaptation as
presented in Section 5 of Report 25/298, be approved.
8. The Flood Risk Management (Scotland) Act 2009 Publication of Cycle 2
Interim Report
There was submitted a report by Strategic Lead – Environment and
Infrastructure (25/300) (1) seeking acknowledgement of the content of the interim
reports on the Local Flood Risk Management Plans, and (2) following publication of
the second Local Flood Risk Management Plans in December 2022, presenting the
final drafts of the Interim Reports on the progress made with the implementation of
the plans by the required deadline of no later than December 2025.
Resolved:
(i) The progress made on delivering the Local Flood Risk Management Plans
published in December 2022 as set out in the Interim Reports, be endorsed.
(ii) The content of the Interim Reports on the Local Flood Risk Management
Plans for the Tay District and the Council’s input to the Interim Reports for the
Forth, the Forth Estuary and the Tay Estuary & Montrose Basin Districts, be
acknowledged.
(iii) It be approved that the Strategic Lead – Environment and Infrastructure will
carry out final minor amendments to the Interim Reports, if required, prior to
final publication due in December 2025.
(iv) The proposed arrangements for publication of the Interim Reports, be
approved.
~~~~~~~~
Page 7 of 86

Page 8

Page 8 of 86

Page 9

CLIMATE CHANGE AND SUSTAINABILITY COMMITTEE
OUTSTANDING BUSINESS STATEMENT (OBS)
(Report No. 26/44)
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS.
No Minute
Reference
Subject Title Outstanding Action Update Lead Officer
/Service
Action Due /
Complete
Action
Expected
10. 10 November
2025
Item 5
Perth & Kinross
Outdoor Access
Forum Annual
Report 2024-25
Provide details of the
monies that go to
SUSTRANS, more
specifically around the
Tier 1 and Tier 2 funding
for active travel throughout
the area and whether this
could be used for core
paths / rights of way etc
and if so, how much did
Perth and Kinross receive
and where has the money
been allocated.
Update provided by
Michael Findlay, Active
Travel & UTC Engineer
forwarded to
Committee Members
via email on 29
January 2026.
Michael Findlay COMPLETE 18 February
2026.
11. 10 November
2025
Item 5
Perth & Kinross
Outdoor Access
Forum Annual
Report 2024-25
Provide statistical details
on the case work and how
issues are resolved and
the timeframes involved.
Update provided by
Dave Stubbs,
Greenspace Co-
ordinator forwarded to
Committee Members
via email on 9
February 2026.
Dave Stubbs COMPLETE 18 February
2026.
4
Page 9 of 86

Page 10

Page 10 of 86

Page 11

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee or Board: Climate Change and Sustainability Committee
Date of Meeting: 18 February 2026
Report Title: The Perth and Kinross Circular Economy Strategy
2026-2031.
Report Number: 26/45
Report Author: Pete Leonard, Climate Change and Zero Waste
Manager and Angela Harris, Sustainable
Development Officer
Organisational Lead: Fraser Crofts, Strategic Lead for Environment and
Infrastructure
___________________________________________________________________
1. Purpose
1.1 The purpose of this Report is to inform Members of the outcome of the public
consultation on the Council’s draft Circular Economy Strategy, and to present
a revised, final version of the strategy and associated action plan for approval.
1.2 Sections
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices
2. Recommendations
It is recommended that the Committee:
2.1 Approves the Circular Economy Strategy and Action Plan
2.2 Notes the governance arrangements and the intention to provide annual
progress updates to Committee
5
Page 11 of 86

Page 12

3. Background/Context
3.1 A report to the CC&S meeting 20 August 2025 provided Members with a final
update on the 2010-2025 Waste Management Plan. The report also set out
forthcoming legislative and policy changes that are likely to arise from the
Scottish Government’s Circular Economy Strategy and Routemap. The paper
proposed that a new, five-year, strategy was required in response to these
national changes, to ensure that the Council was fully informed of the
potential impacts and to prepare for implementation.
3.2 A proposed Circular Economy Strategy consultation document was approved
by Committee to go to public consultation.
3.3 Extensive engagement took place with various internal and external
stakeholders including business representatives, local communities, and
organisational partners. An online Public Consultation was conducted in
September and October 2025 and an in-person consultation workshop was
undertaken in November 2025 for business and industry stakeholders. A
Strategic Environmental Assessment Scoping report for the strategy was sent
to the Consultation Authorities (SEPA, NatureScot and Historic Environment
Scotland) in September 2025. Feedback from all consultation events was
taken into account to shape the final version of the strategy.
3.4 91 responses were received online . Analysis of the responses is set out
below:
 67% of responses were from women .
 68% of responses were from people aged over 50.
 0% of responses were received from people aged 24 or under.
 Total combined views of explanatory video - 3,460 (reach 2,346) .
 17,370 Facebook views .
 All wards represented (top 3 - Highland, Perth City Centre, Strathmore).
 In agreement/support of:
- Vision – 83% .
- Strategic Priorities – 72% .
- Delivery Areas – 80%. 
3.5 General observations from the feedback were:
 Clearer and simpler communication .
 Climate scepticism .
 Clearer goal setting .
 Better explanation of links to other policy areas (e.g. poverty, equality,
accessibility) .
 More explicit focus on behaviour change .
 More upstream focus .
 Council sphere of influence.
Page 12 of 86

Page 13

4. Main Issues
4.1 The Perth and Kinross Circular Economy Strategy will inform the future
transformation of the Council’s waste and recycling operations and associated
infrastructure. It will impact on major contracts expenditure and will support
sustainable economic development activity with local businesses.
4.2 Whilst a number of national policy changes have been signalled, there is as
yet little detail on many of the initiatives. These are still being worked through
and will develop over time. The Scottish Government and Zero Waste
Scotland are investing in research and analysis and are engaging Local
Authorities in a process of collaborative policy development and practical
design of solutions.
4.3 Consequently, various new national policies will come into force during the
next five years, some of which may be underpinned by legislation. The
Council will need to respond with its own policies and practices as the national
position becomes clearer, and it is envisaged that further reports to
Committee will be required. The strategy/action plan itself will evolve over
time.
4.4 Key areas for attention include:
Policy Impact Implementation
Packaging Extended
Producer Responsibility
Additional funding for LA
waste and recycling services.
Independent assessment of
LA performance
Now, with
continued
development of
model and
processes over
the next 24
months
New code of practice
for waste and recycling
collection services
Possible segregation of
food/green waste
Possible end to rural food
waste exemption
Possible kerbside textile
collections
Possible kerbside Waste
Electronic and Electrical
Equipment collections
More standardisation of
services, e.g. bin colour, size,
frequency of collection
National targets (possibly
statutory)
Early 2027
Deposit Return Scheme Increased recycling rates for
included materials
Better quality of materials for
reprocessing
October 2027
Page 13 of 86

Page 14

Reduced litter and associated
clean-up costs
New employment
opportunities
Significant changes to the
composition and tonnages of
kerbside recycling container
mix – may impact routing or
collection frequency.
Financial impact – pluses and
minuses
UK Emissions Trading
Scheme
Over the longer term, may
assist in the transfer to more
sustainable materials
In the short to medium term is
likely to increase cost of
disposal considerably – likely
between £1-2m per annum
for PKC
2028
5. Proposals
5.1 The proposed Circular Economy Strategy and Action Plan can be found in
Appendix A of this report.
5.2 The strategy aligns with the following Corporate Priorities:
 Tackling climate change and supporting sustainable places.
 Developing a resilient, stronger and greener local economy.
 Tackling poverty.
 Working in partnership with communities.
5.3 National policy drivers include:
 Scotland’s Zero Waste plan (2010).
 Scotland’s Climate Change Plan (2020).
 A Draft Circular Economy Strategy for Scotland (2025).
 Scotland’s Circular Economy and Waste Route Map to 2030 (2024).
 Scotland’s National Strategy for Economic Transformation (2022).
Page 14 of 86

Page 15

5.4 The vision for the strategy is:
5.5 We will measure our success in delivering our vision and goals by the
following outcomes: 
 We will have complied with legislation.
 We will have reduced waste and improved reuse and recycling. 
 We will have reduced carbon emissions and the environmental impact of
our waste. 
 We will have saved money – for the Council and across society .
 We will have supported people to make the right choices and made it
easier for them to use our services.
 We will have created new and/or more resilient businesses and
connected them to each other and to communities.
5.6 The strategy sets out five main priorities:
1. Reduce and Reuse.
2. Modernise Recycling.
3. Decarbonise Disposal.
4. Strengthening the Circular Economy.
5. Behaviour Change.
5.7 Each of these priorities is examined through the lens of four delivery themes:
1. Waste and Recycling Services.
2. Other Council Services.
3. Consumers and Society.
4. Business and Industry.
5.8 Challenges and opportunities were assessed, and an Action and Delivery
Plan was created setting out actions for the short term (within a year), medium
term (within 2-3 years), and long term (4+ years).
5.9 A designated action lead will be responsible for overseeing the review and
reporting process of their action(s). The Council’s internal Circular Economy
Page 15 of 86

Page 16

Strategy Working Group will provide governance and oversight, ensuring that
all relevant aspects are addressed during the reporting process. Regular
communication and collaboration between stakeholders will be crucial to
effectively execute the Action Plan and drive progress towards our objectives.
5.10 A robust monitoring and evaluation framework will be put in place, with a set
of indicators for each of the six strategic outcomes together with RAG status
action tracking. Initial measures for the strategic outcomes are set out in the
table below:
Outcome Measure Current Figure
We will have complied
with legislation
No breaches Zero
We will have reduced
waste and improved
reuse and recycling
Current recycling rate(s) – Waste Data
Flow 
Reuse figures – Waste Data Flow
50.9% recycling
rate (2024) 
Reuse: 394T =
0.54% of total
waste
(2024)
We will have reduced
carbon emissions and the
environmental impact of
our waste  
Waste CO2 equivalent- Waste Data Flow 131,661 TCO2e; 
0.85 TCO2e per
person
(2024)
We will have saved money
– for the Council and
across society
Income from the sale of recyclates 
Data from selected materials management
interventions
Data from Reuse organisations where
available
£879,191
(2024/25)
As projects arise
To be
determined
We will have supported
people to make the right
choices and made it
easier for them to use our
services
Number of large-scale campaigns
Number of in-person events
Number of people engaged with at face-to-
face events
Number of people engaging with social
media- views, shares, followers 
Number of assisted lifts
Number of additional bins – e.g. for
medical or childcare reasons 
Will
gather data for
2026
We will have created new
and/or more resilient
businesses and
New start-ups in CE sector
Number of jobs/new jobs in CE sector (to
be developed) 
23 (2025)
Page 16 of 86

Page 17

connected them to each
other and to
communities. 
Business survival rates in CE sector
Number of business to business and
business to community networks (to be
developed) 
5.11 It is the intention to provide formal annual updates to Committee.
6. Conclusion
6.1 The waste and recycling industry is entering a period of significant change.
The proposed Circular Economy Strategy and Action Plan will ensure that the
Council is fully informed of changes in policy and legislation, understands
potential impacts, and is prepared for implementation in good time.
7. Impact and Value Assessment
Perth & Kinross Council Circular Economy Strategy 2021 - 2026
8. Appendices
8.1 Appendix A – Perth and Kinross Circular Economy Strategy and Action Plan.
Page 17 of 86

Page 18

Page 18 of 86

Page 19

Appendix 1
Perth and Kinross Council
Circular Economy Strategy
2026-2031
Perth & Kinross Council
February 2026
5
Page 19 of 86

Page 20

Contents
Welcome
1. Introduction
2. How will the Strategy be delivered?
3. What action will be taken?
4. Implementation and Monitoring
Glossary
Appendix 1 – CES Action and Delivery Plan
Page 20 of 86

Page 21

1
Welcome
Welcome to the first Circular Economy Strategy (CES) for Perth and Kinross Council. 
The CES has developed in response to the Scottish Government’s vision to ‘deliver a
fully circular economy in Scotland by 2045, driven by responsible consumption,
responsible production, and maximising value from waste and energy’.
It sets out our priorities and action towards a Circular Economy for Perth and Kinross for
the period 2026-2031, with an accompanying action and delivery plan (Appendix 1). 
What do we want to achieve?
Our vision for the CES is:
We will measure our success in delivering our vision and goals by the following
outcomes:
 We will have complied with legislation
 We will have reduced waste and improved reuse and recycling
 We will have reduced carbon emissions and the environmental impact of our waste
In Perth and Kinross, we aim to build communities where everyone
understands how to use resources responsibly and reduce waste. We
take pride in making thoughtful choices that support the environment
and improve our quality of life, by protecting nature, growing the
economy, creating jobs, and strengthening our communities.
Together, we are working toward a greener and more sustainable
future.
Page 21 of 86

Page 22

2
 We will have saved money, for the Council and across society
 We will have supported people to make the right choices and made it easier for them
to use our services
 We will have created new and/or more resilient businesses and connected them to
each other and to communities.
Who did we speak to when developing the Strategy?
The CES was prepared with input and feedback across Council Services. Extensive
engagement initiatives have been conducted with various internal and external
stakeholders including business representatives, local communities, and organisational
partners. An online Public Consultation was conducted in September and October 2025
and an in-person consultation workshop was undertaken in November 2025 for business
and industry stakeholders. A Strategic Environmental Assessment Scoping report for the
CES was sent to the Consultation Authorities (SEPA, NatureScot and Historic Environment
Scotland) in September 2025. Feedback from all consultation events was taken into
account to shape this final version of the strategy.
Page 22 of 86

Page 23

3
Introduction
What is a Circular Economy?
We are using more and more raw materials from the earth to make things that we may
only use once before throwing them away. This approach, known as the Linear
Economy, impacts our environment, personal health, overall economy and our wallets.
A circular economy approach offers us an alternative by looking at our behaviour in
relation to materials and products we use. It reduces the need to buy and consume
more things by finding ways to keep existing materials and products in use for as long
as possible. This also helps to minimise waste.
Figure 1. Linear Economy vs Circular Economy
Page 23 of 86

Page 24

4
Why shift towards a Circular Economy?
 Each person in Scotland uses about 8 tonnes of materials per year — more
than twice the sustainable limit.
 In 2022, only 1.3% of the resources used in Scotland were cycled back into the
economy, with over 98% of Scotland’s material use coming from new (virgin)
resources.
 80% of Scotland’s carbon footprint comes from making, using, and throwing
away products.
 Over 85% of product-related impacts come from manufacture and transportation
 People in the UK have £1.6 billion worth of unworn clothes in their wardrobes —
that’s 1 in 4 items not being used. Textiles are the most damaging type of waste
thrown away by households in Scotland – accounting for nearly a third of all
household waste carbon footprints.
 Scottish households waste food worth £440 per year on average.
 The circular economy has the potential to create over 500,000 new jobs across
the UK.
What behaviours do we need to change?
For existing products
 Avoiding single-use items (such as disposable cups or plastic bags) and
choosing reusable or refillable products.
 Fixing broken items instead of throwing them away.
 Donating or selling things you no longer need.
 Buying second-hand when possible.
 Using sharing schemes (e.g. tool libraries, car clubs).
 Borrowing instead of buying when you only need something short-term.
 Recycling and sorting household and business waste correctly.
Page 24 of 86

Page 25

5
For new products
 Supporting products made from recycled materials, and that are durable,
repairable and designed to last (easy to repair).
 Avoiding over-packaged goods and supporting businesses that offer reduced
and/or sustainable packaging.
 Considering the full life of a product before buying.
 Supporting circular design and innovation.
Working together for a Circular Economy
Consumers and society have a huge role to play in the move towards a circular
economy by adopting these behaviours. Although many people are becoming more
aware of how they consume things and are trying to choose more sustainably options,
choices are still often unavailable.
Local businesses and industries have a large part to play in adopting circular business
models that offer a wider choice to the consumer – for example, offering products as a
service through leasing or subscription schemes, promoting sharing platforms to reuse
and share existing products, or take-back programs to encourage the of return products
for refurbishing and recycling.
A successful circular economy can only be achieved by working across all sectors of
society – including the Council, individuals and communities, businesses and industries.
Why do we need a Circular Economy Strategy?
Our existing Waste Management Plan finished at the end of 2025. The plan has led to
many improvements in managing and recycling waste across Perth and Kinross over
the last 15 years - including improved recycling rates and reduced levels of non-
recycled waste.
However, certain waste areas – such as food, textile and construction waste - still have a
long way to go. With this in mind, and the national focus on circularity of waste, a Circular
Economy Strategy for Perth and Kinross offers the opportunity to combine established
Page 25 of 86

Page 26

6
recycling practices with action that rethinks the way we produce, use and consume things.
This strategy will provide a framework for communities, individuals and businesses to use
new technology, new ideas and new skills to make the changes we need, in the way we
live and work.
How does the Strategy align with National, Regional, and
Local Strategies and Policies?
Policy/Strategy Impact on Circular Economy
Scotland’s Zero
Waste Plan (2010)
Recognised that a zero waste Scotland has an important role in
helping to achieve the targets set in the Climate Change
(Scotland) Act 2009
Set the following specific targets including:
 recycling 70% of all waste by 2025
 a ban on biodegradable waste to landfill by 2025.
 no more than 5% of waste going to landfill by 2025.
Scotland’s Climate
Change Plan (2020)
The Plan sets out a vision for a Circular Scotland and identifies
a range of actions needed to ensure Scotland meets its duties
under the Climate Change Act.   These cover the following
related areas:
 Building the Circular Economy
 Driving down food waste
 Reducing waste sent to landfill
 Improving waste data
 Reducing emissions from closed landfill sites
 Promoting efficiency of energy from waste plants,
 Encouraging reprocessing investment and preventing
waste
Page 26 of 86

Page 27

7
A Draft Circular
Economy Strategy
for Scotland (2025)
The draft strategy outlines how the Scottish Government plans
to work with businesses, charities, the public sector and a broad
coalition of stakeholders to make the whole economy circular
and bring jobs and opportunities for the people of Scotland.
Scotland’s circular
economy and waste
route map to 2030
(2024)
The route map identifies the priorities to 2030 that will help
Scotland to progress to a circular economy and maximise the
positive impact of the Circular Economy (Scotland) Act 2024 for
communities across Scotland.
Scotland’s National
Strategy for
Economic
Transformation
(2022)
Identifies the Circular Economy as an area of new market
opportunity for the wellbeing economy - ‘generating new, well-
paid jobs from a just transition to net zero - where resources are
kept in high-value use, creating new market, innovation and job
opportunities that will be key to achieving our targets for net zero
and nature’. This will help with a Community Wealth Building
(CWB) approach that promotes local economic development
through more productive and innovative businesses, industries,
regions, communities and public services
Procurement
Reform Act (2014)
Includes a requirement for contracting authorities to consider
how they can improve economic, social and environmental
wellbeing through regulated procurement and to act in a way to
secure this.
Page 27 of 86

Page 28

8
How will the Strategy be delivered?
Priorities for the Strategy
To help us reach our vision and goals, we are focusing on five main priorities in our
Circular Economy Strategy (CES) for Perth and Kinross. These priorities will guide our
actions and help us make real progress.
Priority 1. Reduce and Reuse
 Work with our residents and businesses to change patterns of production,
consumption and disposal
 Improve circularity of the Tayside Food System to promote local, healthy eating and
reduce food waste and food poverty
 Reduce textile waste
 Ensure Council services, including schools, model best practice to lead by example
Priority 2. Modernise Recycling
 Modernise household recycling and reuse services to maximise performance and
meet evolving needs, in a fair and inclusive way
 Support businesses and commercial premises to reduce waste and maximise
recycling
Priority 3. Decarbonise Disposal
 Understand the best environmental outcomes for specific wastes
 Ensure there is an appropriate capacity to manage waste
 Improve environmental outcomes for waste through innovation
 Support the incentivisation of decarbonising waste
Priority 4. Strengthening the Circular Economy
 Set the strategic direction and act as a regional catalyst for change
Page 28 of 86

Page 29

9
 Grow the enabling environment to support and attract circular businesses
 Encourage circular construction practices
 Coordinate action across cross-cutting areas and robustly monitor, evaluate and
report progress
Priority 5. Behaviour Change
 Encourage consumers and organisations to adopt circular behaviours
 Demonstrate how people can save money by engaging in reuse and repair activities
 Highlight the environmental and financial impact of poor waste management
practices and behaviours.
Page 29 of 86

Page 30

10
Delivery Areas for the Strategy
To make the Circular Economy Strategy (CES) work, the Council has chosen four key
areas where it can lead or influence. These areas will work together to take action and
support the four main priorities in different ways to help make real changes in how we
live, work, and manage waste.
Area 1. Waste and Recycling Operations
This includes waste services the Council runs or contracts out, like household and
business bin collections, recycling centres and reuse facilities.
Area 2. Council Services
This covers different parts of the Council, such as buying goods (procurement),
community food growing, energy and buildings, roads, schools, and healthcare services.
Area 3. Consumers and Society
This looks at how people and communities use products and services in their daily lives -
it includes areas like food, housing, transport, healthcare, and communication.
Area 4. Business and Industry
This focuses on local businesses in areas like energy, farming, water, waste, tourism,
and hospitality
In many cases the delivery areas will work with and across each other to deliver action
with varying levels of impact (Figure 2.).
Page 30 of 86

Page 31

11
Figure 2. Delivery Area level of impact on Strategic Priorities
Delivery Area 1 – Consumers and Society
This area looks at how people and communities use products and services in their daily
lives - it includes areas like food, housing, transport, healthcare, and communication.
What are the challenges for Consumers and Society?
 Food poverty and food waste – there is lots of great community-led work, but food
waste and food poverty are still big problems.
 Unsustainable behaviours – fast fashion is one example of how we buy and throw
away too much. These habits are now commonplace and greener options are often
hard to find or afford.
 Recycling education - many people do not know how useful some materials can be
if reused and there is confusion about where recycling and waste ends up.  New
residents are often confused about what to do with waste.
Page 31 of 86

Page 32

12
 Fly-Tipping - illegal dumping of waste is a growing problem in Perth and Kinross.
What are the opportunities for Consumers and Society?
 Existing community networks - there is a strong network of community reuse
organisations, now working together through Climate Connect to take action for
nature, food, energy, transport and zero waste as well as the local Climate Café
Network.
 Communications and engagement – encouraging people participate in initiatives
and events that promote second hand purchasing and repair e.g. Share Repair
Aware Week.
 Community awareness and willingness - many people in the community want to
make sustainable choices, especially when it is affordable and easy to do. The
market for preloved clothing is growing and there is increasing awareness of the
inequality/human rights issues associated with ‘disposable’ clothing.
Delivery Area 2 – Business and Industry
This area focuses on working together to support and attract circular businesses, with
additional focus on construction, tourism and hospitality.
What are the challenges for Business and Industry?
 Understanding - many businesses don’t fully understand what a circular
economy means or how it could benefit them.
 Resources and Support - most local businesses are small and do not have extra
staff or time to explore new ideas. It’s also hard for them to access money to try new
products or processes.
 Food and hospitality - not everyone knows about food sharing and redistribution
systems. Strict rules about food dates can stop good food from being shared in time.
 Construction - there are few rewards for builders to repair or reuse buildings instead
of knocking them down. New buildings and houses are rarely designed to be taken
apart and reused later.
Page 32 of 86

Page 33

13
What are the opportunities for Business and Industry?
 Established partnership working - there are solid relationships with experts in the
circular economy. Projects and locations already show how circular economy
principles work in real life. These can help attract more businesses and investment.
 Agri-sector engagement - long-standing ties with James Hutton Institute and other
agricultural leaders can be used to get more farmers and agri-businesses involved. 
The Good Food Nation development is another new engagement route.
 Local best practice - Perth and Kinross has many great examples to learn from –
including manufacturers, food redistribution agencies, and recycling initiatives.
 Study Insights – a recent study highlights opportunities that could be applied across
Perth and Kinross, for example in using leftover fruit and potato waste, making starch
from by-products, recovering and reusing plastics, reducing food waste across the
supply chain, and improving sustainability in construction and buildings.
 Perth and Kinross Landing Strip – an online space created by the Council to
support exchange of ideas around circular materials, remanufacturing, reuse and
repurposing, green farming and food production, to drive large scale circular
economy projects in Perth and Kinross.
Delivery Area 3 – Waste and Recycling Services
Waste and Recycling Operations includes services provided by the Council directly, such
as household and business waste and recycling collections and reuse facilities; and
those we contract to other service providers, particularly in the recycling and waste
processing sector.
What are the challenges for Waste and Recycling Services?
 Investment - big recycling and reuse projects need lots of money and space to get
started. Uncertainties in new laws and policies coming in the next 1–3 years make it
harder to plan ahead and invest with confidence and the Council has limited funds to
invest in large projects.
Page 33 of 86

Page 34

14
 Competition among reuse organisations - even though reuse groups work well
together, they still have to compete for materials to reuse and funding to run their
projects, which can make it harder for them to grow and succeed.
 Waste awareness and engagement – there are variable levels of engagement with
recycling services, particularly for food waste. We could recycle more items but not
everybody follows recycling rules and a study of our recycling bins shows they are
often contaminated with the wrong items. Fly-tipping (illegal dumping) is increasing.
 Procurement Obstacles - tendering on price alone can make it difficult to secure
local suppliers.
 Recycling and waste management - bin systems inside buildings can
be inconsistent, and some plastics are hard to recycle.
What are the opportunities for Waste and Recycling Services?
 Smart technology can improve services like bin collections, giving live updates to
households and businesses and showing when bins are contaminated (wrong items
inside).
 New technology and processes – can support new tools that can turn hard-to-
recycle plastics into useful materials. This helps cut down on burning waste and
creates value.
 Promoting the waste hierarchy - acting early to avoid waste in the first place and
focusing on reducing plastic waste before it becomes rubbish.
 Extended Producer Responsibility for Packaging (pEPR funding) - this funding
will help improve recycling services and make needed upgrades.
 Deposit Return Scheme – has the potential to improve the quality and value of
materials being recycled, increase recycling rates and reduce roadside litter.
Delivery Area 4 – Other Council Services
Council services have a major role in facilitating and promoting a shift to a circular
economy. This area covers different parts of the Council, such as buying goods
Page 34 of 86

Page 35

15
(procurement), community food growing, energy and buildings, roads, schools, and
healthcare services.
What are the challenges for Other Council Services?
 Skills and Knowledge - Some Council teams do not fully understand circular
economy ideas or how they can help. Many also lack technical knowledge and
industry contacts to spot opportunities.
 Material Data Gaps - The Council does not have a clear picture of how much
material it uses or throws away or the potential for transfer between teams
 Storage Problems - The Council does not have big enough storage spaces or the
right licences to hold items like soil, furniture, or asphalt between uses. It is also
uncertain who is responsible (Council or partner organisations) for keeping stored
materials safe and in good condition.
 Financial Pressures - Budgets are tight, so individual service teams often need to
choose cheaper items that do not last long, instead of better-quality items that cost
more.
 Need for Clear Guidance -  there is no detailed guidance to help Council service
teams buy sustainably or avoid single-use items, especially in construction projects.
What are the opportunities for Other Council Services?
 Sustainable Procurement - With the Council’s new Sustainable Procurement
Policy, there are opportunities to drive change through Contracts - for example,
including the impact of transport emissions in waste contracts can help reduce
emissions, making locally based suppliers more appealing.
 Good Food Nation – a Good Food Strategy and Action Plan will be created by 2026.
bringing together different food-related projects and partnerships.
 Sharing Good Practice - the Council can lead by example in choosing greener
options in construction contracts, and this can help influence industry by sharing what
works well.
 Cost Savings – saving money through sharing, reusing, and redistributing materials
can help save money.
Page 35 of 86

Page 36

16
Implementing and Monitoring the Strategy
What action will be taken?
A Circular Economy Strategy (CES) Action and Delivery Plan has been developed,
focusing on the four key delivery areas mentioned earlier. It includes actions for:
 Short term (within 1 year)
 Medium term (2–3 years)
 Long term (4+ years)
Actions based on the opportunities and challenges shared earlier have been developed
to help deliver the CES. The CES Action and Delivery Plan is detailed in Appendix 1
below.
How will action be implemented?
To implement the CES Action and Delivery Plan, a designated action lead will be
responsible for overseeing the review and reporting process of their action(s). The
Council’s internal Circular Economy Strategy Working Group will provide guidance and
oversight, ensuring that all relevant aspects are addressed during the reporting process.
Regular communication and collaboration between stakeholders will be crucial to
effectively execute the Action Plan and drive progress towards our objectives.
Governance
A governance structure will be established to oversee the implementation and evaluation
of the Action Plan, with roles and responsibilities clearly defined for all stakeholders
involved. The CES Working Group will serve as the primary governing body, providing
strategic direction and guidance, while the Council and relevant committees will be
responsible for executing large scale changes.
How will we monitor and evaluate our performance?
Page 36 of 86

Page 37

17
To ensure the effective implementation and assessment of the CES Action and Delivery
Plan, a robust monitoring and evaluation framework will be developed once the CES has
been approved by Committee. A set of SMART (Specific, Measurable, Achievable,
Relevant, Target) objectives and indicators will be used to analyse and annually report
progress.
The following measures will be used to assess the overall success of the CES.
Outcome Measure Current Figure
We will have complied with
legislation
No breaches Zero
Current recycling rate(s) – Waste
Data Flow
50.9% recycling rate
(2024)
We will have reduced
waste and improved reuse
and recycling Reuse figures – Waste Data Flow Reuse = 394T =
0.54% of total waste
(2024)
We will have reduced
carbon emissions and the
environmental impact of
our waste 
Waste CO2 equivalent - Waste
Data Flow
131,661 TCO2e;
0.85 TCO2e per
person
(2024)
Income from the sale of
recyclates
£879,191
(2024/25)
Data from selected materials
management interventions
As projects arise
We will have saved money
– for the Council and
across society
Data from Reuse organisations
where available
To be determined
Number of large-scale campaigns
Number of people engaged with
at face-to-face events
Number of in-person events
Number of people engaging with
social media- views, shares,
followers
We will have supported
people to make the right
choices and made it easier
for them to use our
services
Will gather data for
2026
Page 37 of 86

Page 38

18
No. of assisted lifts
No. of additional bins – e.g. for
medical or childcare reasons
No. of CE related businesses 23
New start-ups in CE sector
No. of jobs/new jobs in CE sector
(to be developed)
Business survival rates in CE
sector
We will have created new
and/or more resilient
businesses and connected
them to each other and to
communities.
No. business to business and
business to community networks
(to be developed)
Page 38 of 86

Page 39

19
Glossary
CES (Circular Economy Strategy) - This document which presents the Council’s strategic
approach to circular economy
Passivhaus - The Passivhaus Standard is a way of designing buildings to use very little
energy for heating or cooling. Passivhaus helps to both reduce operational resource
need and promote durability of design.  More widely the design specifications,
repairability, maintenance and longevity of materials are all important considerations.
pEPR (Planned Extended Producer Responsibility) A policy approach where producers
are given significant responsibility—financial and/or physical—for the treatment or disposal
of post-consumer products, especially packaging. The Council currently receives an
annual sum for dealing with packaging not handled by the producers.
DRS (Deposit Return Scheme) - A recycling system where consumers pay a small
deposit on drinks containers, which is refunded when the container is returned for recycling.
WEEE (Waste Electrical and Electronic Equipment) - waste which is controlled under
the Waste Electrical and Electronic Equipment Regulations 2013, which must be collected
separately to general waste.
Page 39 of 86

Page 40

i
Appendix 1 – CES Action and Delivery Plan
ID Strategic Action Strategic
Objective
Delivery Area(s) Ease of
implementation
Cost
effectiveness
Responsible lead Timescale
Food waste
1 Roll out more food waste hubs, as part of the
Food Waste Action Plan
Reduce and
reuse
Waste and
recycling
services
Easy High Climate Change
and Zero Waste
team
Jun 26 - Mar 27
2 Develop baseline data of knowledge,
participation and barriers to reducing food
waste
Reduce and
reuse
Waste and
recycling
services
Easy High Climate change
and Zero Waste
team
Mar 25- Mar 26
3 Develop a Good Food Partnership and prepare
a Good Food Strategy & Action Plan for Perth &
Kinross
Reduce and
reuse
Consumers and
society
Moderate Medium Climate change
and Zero Waste
team
By Dec 27
4 Develop a Food Waste Action Plan alongside an
awareness campaign to show the financial and
carbon value of food
Reduce and
reuse
Consumers and
society
Easy High Climate change
and Zero Waste
team
Underway
Page 40 of 86

Page 41

ii
Textile waste
5 Develop a Textiles campaign to reduce
consumption, reuse and repair of textiles and
recycle correctly at end-of-life
Reduce and
reuse
Consumers and
society
Moderate Medium Climate change
and Zero Waste
team
By May 26
Litter and fly tipping
6 Design and deliver a litter and fly-tipping
strategy and action plan to reduce the number
of fly-tipping incidents by promoting special
uplifts and other support mechanisms; raising
the awareness of householders of their legal
Duty of Care obligations; and enhancing
enforcement activities.
Reduce and
reuse
Waste and
recycling
services
Easy Medium Climate change
and Zero Waste
team
Feb 26 - Feb 27
7 Conduct an audit of the condition, placement
and usage of litter bins throughout Perth and
Kinross to ensure best use of resources and
advise future replacement programmes.
Modernise
recycling
Waste and
recycling
services
Moderate Medium Climate change
and Zero Waste
team
By March 2027
Page 41 of 86

Page 42

iii
Waste and recycling operations
8 Explore kerbside collections of additional
materials such as small WEEE and/or batteries
Modernise
recycling
Waste and
recycling
services
Moderate Medium Climate change
and Zero Waste
team
By Oct 2027
9 Development of the Commercialisation
Transformation Programme to provide better
recycling services to businesses and skip
services to PKC residents at reasonable prices
whilst pushing for reuse and recycle
Modernise
recycling
Waste and
recycling
services
Moderate Medium Climate change
and Zero Waste
team
Jan 2026 to June
2027
Digital innovation and technology
10 Make improvements to online services for
residents & businesses and improve internal
efficiency - Digital Transformation Programme
Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
By Sept 2027
11 Expansion/development of in-cab technologies Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
Ongoing
development
12 Explore the usage of AI to improve services
such as an AI app advising what bin to place
materials in when scanned
Behaviour
Change
Consumers and
society
Easy/ Moderate Medium Climate change
and Zero Waste
team
2028 onwards
Page 42 of 86

Page 43

iv
13 Develop a digital platform to highlight
resources that can be shared or reused across
Council services
Reduce and
reuse
Council services Easy Medium Climate change
and Zero Waste
team
May 26 - Dec 26
14 Invest in a digital reuse platform to link
businesses / public sector / third sector / reuse
organisations to share unwanted items and
monitor associated carbon saving
Reduce and
reuse
Consumers and
Society/Business
and Industry
Moderate Medium Climate change
and Zero Waste
team
May 26 - Dec 26
Communication and education
15 Provide information on bins in the form of a
welcome pack for new residents that can be
issued by estate agents/landlords, Council Tax,
non-domestic rates, etc.
Reduce and
reuse
Consumers and
society
Easy/ Moderate Medium Climate change
and Zero Waste
team
Dec 26
16 Continue Recycle Right awareness across
multiple channels
Behaviour
Change
Consumers and
society
Easy/ Moderate Medium Climate change
and Zero Waste
team
Ongoing during
the life of the
plan
17 Adopt video and social media communications
to better connect with the public - for example
to demonstrate where their waste and recycling
goes, improve understanding of the fees/costs
of processing waste, the risks of fire from
batteries etc.
Behaviour
Change
Consumers and
society
Easy/ Moderate Medium Climate change
and Zero Waste
team
Ongoing during
the life of the
plan
Page 43 of 86

Page 44

v
18 Development and implementation of a
Resource Management Plan for Education &
Children’s Services to improve the reduction
and recycling of waste, energy efficiency and
environmental messaging within schools
Reduce and
reuse
Council services Difficult High Climate change
and Zero Waste
team and
Education
By Sept 2027
19 Promote learning for sustainability and create
fun/challenging STEM subject initiatives to
encourage young people to improve school
recycling
Strengthening
the circular
economy
Council services Moderate Medium Climate change
and Zero Waste
team and
Education
By Sept 2027
20 Develop communications & behaviour change
campaigns for the Business & Industry Sector,
including the promotion of awards and
accreditation
Strengthening
the circular
economy
Business and
Industry
Easy Medium Economic
Development
Team
Ongoing from
Sept 26
Research and development
21 Commission a circular scan of PKC activities to
identify opportunities for impactful circular
solutions
Strengthening
the circular
economy
Council services Moderate Medium Climate change
and Zero Waste
team
By March 2027
22 Commission a Perth & Kinross Circular Scan to
establish a baseline for the Circular Economy
Route Map and identify priority sectors for
intervention (with particular focus on the
Agricultural Sector)
Strengthening
the circular
economy
Business and
Industry
Moderate Medium Economic
Development
Team
Sept 26 – Dec 26
Page 44 of 86

Page 45

vi
23 Develop and launch the Circular Economy
Landing Strip (Brand name Clean Growth Axis) 
– a platform and support system integrating
PKC, relevant statutory bodies, funding
organisations, and private sector to drive large
scale circular economy projects into Perth and
Kinross
Strengthening
the circular
economy
Business and
Industry
Difficult High Economic
Development
Team
March 26
24 Support the development of Project beacon – a
Tay Cities Deal project aimed at removing
hydrocarbons from residual and recycling
waste streams.
Decarbonise
Disposal
Business and
Industry
Difficult High Economic
Development
Team
Jan 26 - Dec 27
25 Explore the creation of a goods depot for use by
different PKC projects - could this be an initial
employment opportunity for upskilling (Castle
Huntly)
Reduce and
reuse
Council services Moderate Medium Climate change
and Zero Waste
team
By June 2027
Legislation and policy
26 Prepare for forthcoming legislative and policy changes by engaging in research, consultations and co-creation workshops for the following:
26a  Digital waste tracking Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
By Oct 26
Page 45 of 86

Page 46

vii
26b  Waste and recycling code of practice Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
Apr 25-Mar 27
26c  Organic waste (food and green waste) Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
Apr 25-Mar 27
26d  Deposit Return System Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
By Oct 27
26e  Regional hubs and/or networks for
construction material reuse
Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
By Dec 27
26f  Emissions Trading Scheme Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
By Dec 28
27 Maximise opportunities to influence
governments and institutions to secure inward
investment in Circular Economy projects
Strengthening
the Circular
Economy
Business and
Industry
Difficult Low Economic
Development
Team
Ongoing during
the life of the
plan
Sustainable procurement
Page 46 of 86

Page 47

viii
28 Review PKC procurement processes to embed
circular economy principles to reduce
consumption of products and materials, for
example reducing single use items and
specifying sustainable construction criteria
Strengthening
the circular
economy
Council services Moderate Medium Procurement
Team
Ongoing – each
specification
will be reviewed
prior to issuing
tender
29 Develop category strategies for high emission
categories that consider climate change
Strengthening
the circular
economy
Council services Moderate Medium Procurement
Team
Subject to
resource being
made available
30 Develop guidance and training to enable buyers
to develop contract documents that consider  
climate change requirements.
Strengthening
the circular
economy
Council services Moderate Medium Procurement
Team
Subject to
resource being
made available
Funding and investment
31 Invest pEPR funding in a range of improvement
actions including improved infrastructure,
frequency of service, education and behaviour
change campaigns, support for community
reuse organisations and improving data flow
and business insights.
Modernise
recycling
Waste and
recycling
services
Moderate High Climate change
and Zero Waste
team
May 25 - Nov 27
32 Asset Management Review of Waste &
Recycling Infrastructure - to establish
investment requirements to support a
sustainable (monetary & carbon) operational
asset base in line with the approach set out in
Modernise
recycling
Council services Difficult High Property Services
Team
Ongoing during
the life of the
plan
Page 47 of 86

Page 48

ix
the Councils approved Property Asset
Management Strategy
Page 48 of 86

Page 49

x
Partnership working
33 Continue and enhance partnership working
with Climate Connect and reuse organisations,
and map Perth and Kinross Reuse Network
activities to support information sharing
network across the sector
Reduce and
reuse
Consumers and
society
Easy Medium Climate change
and Zero Waste
team
Ongoing during
the life of the
plan
34 Develop Business & Industry advice & support
networks, building on the Clean Growth Axis
(with particular focus on SMEs)
Decarbonise
disposal
Business and
Industry
Difficult High Economic
Development
Team
Ongoing from
Sept 26
35 Engage with the business, academic and
employability sectors to stimulate circular
economy skills and employment opportunities
Strengthening
the Circular
Economy
Business and
Industry
Difficult Low Economic
Development
Team
Ongoing during
the life of the
plan
Page 49 of 86

Page 50

Page 50 of 86

Page 51

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee or Board: Climate Change & Sustainability Committee
Date of Meeting: 18 February 2026
Report Title: Tree Planting Policy
Report Number: 26/46
46
Report Author: Magnus Morgan/Calum Bachell – Community
Greenspace
Organisational Lead: Elaine Ritchie – Strategic Lead Housing &
Communities
___________________________________________________________________
1. Purpose
1.1 This report sets out the proposal for a Council wide Tree Planting Policy which
will become part of the Council’s Tree Management Strategy which also
contains the approved Tree Management Policy and Ash Dieback Strategy
The Policy’s aims are to increase tree canopy cover where possible, improve
biodiversity, mitigate climate change and enhance public spaces through
appropriate and sustainable planting.
1.2 Sections
1. Purpose
2. Recommendations
3. Background/Main Issues
4. Impact and Value Assessment
5. Appendices
2. Recommendations
It is recommended that the Committee:
2.1 Approves the Tree Planting Policy that will be the first formal document
covering tree planting throughout Council owned, managed and maintained
land, so that existing funding is used efficiently following recommended
methods and in appropriate locations.
6
Page 51 of 86

Page 52

3. Background/Main Issues
3.1 Historic Information/Context
3.1.1 Trees provide essential habitat for wildlife and maintain biodiversity in the face
of increasing threats from climate change and other human activities. In
addition, they provide improved air quality, flood mitigation, erosion control
and shade provision as well providing health and well-being benefits to the
public.
3.1.2 Ash Dieback and other tree diseases combined with increasingly severe
weather events, have led to a significant loss in tree cover which will need to
be replaced. Naturally aging tree populations will also need planned
replacement. New planting projects to expand carbon sequestration and
canopy cover will benefit greatly from a well-defined process. While native
species will be prioritised, non-native species are also considered where
providing additional ecological resilience and/or other benefits to biodiversity,
climate change, while maintaining Perth & Kinross’s reputation as Big Tree
Country.
3.1.3 Until now there has been no formal structured Tree Planting Policy. This
Policy allows for consistent long-term planning and maintenance of trees on
Council land.  There are many examples of trees of the wrong type being
planted in the wrong locations which go on to cause problems for neighbours
and even physical damage to surfaces and structures.  They can grow too
large for the locations selected and lead to complaints which can be costly to
address.  Trees should not be located where they ultimately compromise the
function of the spaces they are in or adjacent to or require remedial trimming
or felling.
3.1.4 The Tree Planting Policy has been developed to provide a comprehensive
system including planning, site selection, species selection, planting method,
recording, establishment and maintenance based around having the “Right
Tree in the Right Place”. It covers planting and aftercare specific to the varied
site characteristics within Perth & Kinross.
3.2 Options Available to Elected Members/Board members
3.2.1 The Committee agrees to adopt the proposed Tree Planting Policy.
3.2.2 The Committee disagrees with the adoption of The Tree Planting Policy and
planting continues without consistent or appropriate planting methods.
3.3 Rationale for Recommendations made in Section 2
3.3.1 The proposed Policy offers the first formal set of guidelines for tree planting
throughout the Council ensuring that there is an effective and comprehensive
system in place. This will complement current management plans and The
Forest Plan.
Page 52 of 86

Page 53

3.3.2 A structured approach to planting will ensure that existing budgets are used in
the most efficient manner ensuring maximum survivability of planted stock
and reducing the need for the replacement of failed plantings. It will also guide
tree planting into the future, so they are an enhancement to solve problems
rather than creating any.  This should avoid the Council having to deal with
many of the tree management issues set out in the Tree Management Policy 
3.3.3 Logically staged procedures will ensure that planting activities are correctly
recorded, making establishment and maintenance more efficient and allowing
the Council to calculate increases in canopy cover more easily.  It will also
help to guide the appropriate replacement of trees lost in delivering the
Council’s Ash Dieback Strategy
4. Impact and Value Assessment
Tree Planting Policy Impact and Value Assessment
5. Appendices
5.1 Appendix A – Tree Planting Policy
Page 53 of 86

Page 54

Page 54 of 86

Page 55

Tree Planting
Policy
Community Greenspace
Adopted Feb 2026 (tbc)
6
Page 55 of 86

Page 56

Contents
▪ Tree Management Strategy 3
▪ 1.0 Introduction 4
▪ 2.0 Native and Non-Native Species 6
▪ 3.0 Choosing the Right Place 8
▪ 3.1 Recreation Parks 9
▪ 3.2 Countryside Sites 10
▪ 3.3 Cemeteries 11
▪ 3.4 Schools 12
▪ 3.5 Grow Wild Areas 13
▪ 3.6 Orchards and Food Growing 14
▪ 3.7 Green Corridors 15
▪ 3.8 Residential Areas 16
▪ 3.9 Streets and Urban Planting 17
▪ 3.10 Near Buildings & Gardens 18
▪ 4.0 Planting, Establishment & Maintenance 20
▪ 4.1 Planting Stock 21
▪ 4.2 Planting methods 22
▪ 4.3 Establishment & maintenance 23
▪ 4.4 Planting Protections Flowchart 25
▪ 5.0 Memorial Trees 26
▪ 6.0 Recording Data 27
▪ 7.0 Volunteering Opportunities 28
▪ 8.0 Useful links and advice for Council departments 29
▪ Appendices
▪ Appendix 1 – List of native species to Scotland 30
▪ Appendix 2 – Sites with management plans 31
▪ Appendix 3 – BSI standards publications 32
2Page 56 of 86

Page 57

The Tree Planting Policy (TPP) forms part of the Council’s Tree Management Strategy (TMS), which covers the management of
trees on all Council owned or managed land. The TMS also contains the Tree Management Policy (TMP) which describes the
Council’s approach to existing trees, and the Ash Dieback & Roadside Trees Strategy (ADS) which outlines the Council’s
response to Ash Dieback.
The TMS does not provide advice for trees not managed or maintained by the Council, within Conservation Areas, Tree
Preservation Orders or wider forestry and woodland management, which is covered by the PKC Forest and Woodland Strategy.
The TMS is part of the Council’s Climate Change Strategy and Action Plan and supports delivery of the Perth and Kinross Forest
Plan and site-specific management plans. 
3
Tree
Management
Strategy
Ash Dieback  Roadside Trees Strategy
Ash Dieback &
Roadside Trees
Strategy
Tree Planting
Policy
Tree Management Policy
Tree Management
Policy
Tree Management Strategy
Page 57 of 86

Page 58

1.0 Introduction
This Policy sets Council-wide standards and procedures for tree
planting on all Council-owned Land and is aimed at all Council staff
or volunteers planting trees on Council land. A consistent and well-
planned approach enables efficient use of available resources to
achieve the Council’s aims to improve Biodiversity through increased
canopy cover, carbon sequestration and ecological improvements as
well as improving public health and wellbeing and the amenity value
of our greenspaces.
To ensure that the right trees are planted in the right place, this
policy provides guidance on appropriate planting stock, technique,
protection & maintenance for different locations.
Perth and Kinross is proud to be known as Big Tree Country with
historic and famous trees throughout the area boasting many
champion & specimen trees as well as over 200,000 acres of
woodland. Individual trees and woodlands contribute significantly to
the enviable character and quality of the countryside and
settlements of the area, attracting visitors and investment to Perth &
Kinross. 
Trees have a recognised benefit to public health and wellbeing,
offering many benefits that promote mental and physical health and
improve quality of life. Time spent in greenspaces and wooded areas
has been linked to improved health, reduced stress and trees create
a barrier to the noise and sights of built-up environments. These
benefits make appropriately placed trees an important element our
urban and rural open spaces.
Trees are essential in providing habitats for wildlife and maintaining
biodiversity, which is under significant threat due to factors such as
climate change, development and other human impacts. Worldwide,
biodiversity is declining faster globally than at any other time in
recorded human history.
With climate change and the need to reduce CO2 as the climate
warms, trees are playing a vital role in air quality, flood mitigation,
erosion control, shade provision and overall health and wellbeing.
Trees have an important role to play in sequestering carbon and
providing habitat for wildlife, with different species creating ‘niches’
that may be relied on for both fauna and other flora.
Increases in extreme weather events and damage to trees from
storms as well as diseases such as Ash dieback, have resulted in
significant and continued tree loss. Increased tree planting is needed
to replace and restore areas that have suffered losses as well as
improve canopy cover. Between 2022 and 2025 the Council planted
over 6300 trees.
4
To ensure a sustainable future for
trees and people
Policy vision – Right Tree, Right Place
Page 58 of 86

Page 59

Introduction cont.
Public greenspaces require careful species selection to be fit for the
purpose and character of the site they are being used for. Correct
species selection is dependent on location, soil type, exposure and
biodiversity requirements of the site. Other factors like flood risk,
erosion and water safety management are equally as important when
looking a species suitability.
Many trees grow to an impressive extent and can live for over 100
years. Small trees such as Blackthorn and Crab apple can typically
grow up to 10m in height with large trees like Oaks and Ash exceeding
40m. Any new tree planting must be resilient and sustainable in the
long term. This policy aims to ensure that the right trees are planted
in the right place to provide long-term benefits to communities and
our local environment, and to avoid problems arising from trees being
planted in unsuitable locations.
The Perth & Kinross Forest Plan 2015-2035 is an important guiding
document which gives site-specific tree management
recommendations, including species composition, for 38 sites that are
either predominantly woodlands, or contain large, forested areas.
Some sites that the Council manage have site management plans
(appendix 2) with specific advice on tree planting and desired species
compositions. Recommendations for sites not covered by the Forest
Plan or specific site management plans are provided within this Policy.
Not every tree is suited to every location. When planting an area,
many choices need to be made including whether native or non-native
trees will be planted, which specific species will be suitable, what
size of tree is desired and what sort of impacts will the different trees
have. Planting of all new trees on Council maintained sites must be
agreed in advance with or undertaken by the Council’s Community
Greenspace Service.
The Council have their own plant nursery at Westbank in Perth where
a wide variety of native trees and shrubs are grown from locally
sourced seeds, saplings and cuttings. This valuable resource gives the
Council the ability to grow stock at substantially reduced costs,
reduces the carbon footprint from transporting trees and limits the
risk of introducing new diseases into the local environment.
5Page 59 of 86

Page 60

2.0 Native and Non-Native Species
6
Where appropriate for the site, the
Council prioritises the use of native tree
species
Policy – native species
Native species are beneficial for restoring natural habitats and
enhancing wildlife & biodiversity. For local planting, native species are
generally preferred as they are well-adapted to the local
environment, have co-evolved with and support local wildlife and help
to preserve our natural heritage. Certain native species will provide a
beneficial niche for other native wildlife and may be vital to their
survival.
Less maintenance is often required for native species, with inherent
resilience to certain diseases and a tolerance for the local
environmental conditions. Native tree stock is a more cost-effective
approach, with native trees being more readily available in local tree
nurseries including Westbank in Perth (see 4.1 Planting Stock).
Planting projects using external funding may have specific restrictions
or requirements for species composition, such as a requirement for
native species to be used. Appropriate species must be planned for
and considered before funding applications are submitted.
A variety of species on any given site is useful to improve ecological
resilience and, as the climate changes, the range of species may
need to be extended to improve ecological adaption. Some native
species may be less suited to new environmental conditions arising
from climate change. Non-native trees may be more suitable in such
circumstances to add additional resilience to warmer and wetter
climates or to fill gaps where disease and pests have decimated
native trees.
Page 60 of 86

Page 61

7
Non-native species may be a preferred option in certain park
settings to maintain the character of a site, or for a specific
function, such as arboretums, particular visual impact or as part
of a conservation project.
Non-native trees are acceptable in, and can enhance, sites such
as recreational parks, however, they are generally unsuitable for
planting in woodlands, countryside sites or in SSSI sites.
While both native and non-native species can be suitable for
planting, the specific tree species is of particular importance.
Invasive non-native trees must be avoided on all sites. These
include Ailanthus, Cherry Laurel, False acacia, Leyland cypress
and various non-native Poplars. Most non-native species of tree
or shrub cannot be planted into the wild (e.g. into countryside
sites) under the Wildlife and Natural Environment Act (WANE).
Planting of Ash and European larch should not take place due to
the ongoing disease issues of Ash Dieback and Phytophthora
ramorum.
A list of suitable native tree species can be found in appendix 1.
Native and Non-Native Species cont.
Non-native trees may be planted to
maintain the character and function of a
particular site or location
Policy – non-native species
Page 61 of 86

Page 62

3.0 Choosing the Right Place
8
The Council manage a diverse range of sites with unique characteristics, including countryside sites, recreation parks, cemeteries, green
corridors and housing areas. Each type of site requires different considerations when planting trees; therefore, the guidance has been
tailored for each site category. Some larger sites may fall into two or more categories (e.g. MacRosty Park in Crieff contains a woodland
area, a recreation park and grow wild areas). The best practice will be dependent on which area within the site is being considered for
planting. For replacement tree planting where trees cannot be planted in the same location, planting should be considered within suitable
nearby sites.
In this section:
3.1 Recreation Parks 
greenspaces set out for recreation &
play
3.2 Countryside & Woodland Sites
greenspaces in rural and forested
environments
3.3 Cemeteries
churchyards and cemeteries
3.4 School Grounds
play areas and open space in school
grounds
3.5 Grow Wild Areas 
open spaces designated as ‘Grow Wild’
areas
3.6 Orchards and Food Growing
fruit trees in public open spaces and
orchards
3.7 Green Corridors
narrow connective greenspaces and
routes between areas
3.8 Residential Areas
open space within residential
developments
3.9 Street & Urban Planting
urban and built-up environments
3.10 Next to buildings
trees close to buildings, gardens and
utilities
Page 62 of 86

Page 63

3.1 Recreation Parks
Recreation parks provide spaces for the use and enjoyment of
people for active recreation including sports, particularly in urban
areas. Formal and informal active recreation improves physical and
mental health and wellbeing and should be enhanced by but not
dominated by trees.
Where parks have specific management or masterplans (see
appendix 3), trees will be planted following the guidelines within
those plans.  If there are no overall management or masterplans,
the character and function of the park will be considered in terms
of tree location, type and ultimate size.  Some parks may already
have sufficient or excessive tree cover for their function and only
replacements for trees removed should be considered.
The use of planting plans ensures the character and spaces created
in parks are not compromised by trees being planted in the wrong
locations and will also ensure that appropriate succession planting
for older trees is properly planned and implemented. 
Trees should not be planted where they overhang, cast shade or
drop debris on intensively used grass areas, specialist recreational
or sports surfaces or buildings.  The open nature of parks and key
views must not be reduced or compromised by poorly considered
tree planting.  Trees provide important visual features or backdrops
but the temptation of filling any open area with trees without
proper consideration must be avoided.
9
Trees will be planted where the key functions of
the park will not be impacted or compromised
Policy – planting in public parks
Page 63 of 86

Page 64

3.2 Countryside and Woodlands Sites
Countryside and woodland sites are often more natural settings with
more vegetation than other open spaces, where walking and other
outdoor pursuits are the primary recreation function. Due to the
more natural setting of these sites, biodiversity and ecosystems
health are a greater focus when managing these sites. The function
and character of the sites should not be compromised by
inappropriate tree planting that would block key views or reduce
public enjoyment.
Tree planting in countryside and woodland sites should aim to
enhance the recreational experience whilst improving biodiversity
and addressing any tree losses. Countryside sites should only be
planted with native species, unless non-natives are advocated in a
specific site management or master plan. Controlled self-seeding
allows a natural form of regeneration for trees lost through disease,
storms or damage. Varied native species should be selected to ensure
resilience against single species diseases.
The Forest Plan and any individual existing site management plans
(see appendix 2) should always be consulted prior to undertaking
work and implemented as appropriate.
Sites of Special Scientific Interest (SSSI) have additional protections
and planting restrictions. Any specific designations must be checked
along with any relevant stakeholder consultation e.g. NatureScot for
SSSIs.
10
The Council will prioritise the planting native
trees in countryside and woodland sites to
enhance biodiversity and address tree loss
Policy – countryside and woodland sites
Page 64 of 86

Page 65

3.3 Tree Planting in Cemeteries
Trees make a valuable contribution to the amenity and setting of
cemeteries and enhance the sense of tranquillity and peaceful
reflection for those visiting them in addition to biodiversity and
amenity benefits. Tree roots can however cause practical
difficulties in excavating lairs, destabilising headstones and larger
memorials or restricting access. Care is needed in identifying
suitable locations for new tree planting in existing cemeteries and
must be through full discussion and agreement with the
Bereavement Services team and consultation with Friends of
Cemeteries. In general, trees will only be planted in existing
cemeteries as replacements.
Planting within new cemeteries or cemetery extensions should be
incorporated into the design of the site, whilst maintaining the
primary function for burials.  Trees can be planted to provide
distinct avenues in rows and as individual ‘specimen’ trees as focal
points. Root barriers should be considered to protect lairs if there
is any doubt about potential root encroachment.
Suggested species: evergreens such as Yew, Scots Pine, Korean fir
due to non-invasive roots, narrow foliage and less leaf-litter.
Flowering ornamentals also suitable for new cemeteries and
extensions
11
Trees will be planted in areas which do not reduce
capacity, create difficulties for burials, or impact
the sensitive nature of the site
Policy – cemetery planting
Page 65 of 86

Page 66

3.4 School Grounds
Planting in schools offers a valuable opportunity to involve children in
planting, monitoring and maintaining the trees, providing engaging
educational exercises.
Trees in schools are the responsibility of the school and Property
Services and should be in full agreement to any new tree planting. 
Specialist advice can be provided to schools where requested, to ensure
appropriate trees are chosen, planted and maintained following good
practice. Tree planting should be sited in such a way as to ensure the
remaining grounds can function effectively and be efficiently
maintained. 
Perth and Kinross Countryside Trust may also be able to provide support
through the ‘Tree For Every Child’ project to encourage more planting
within school grounds with pupil involvement. Planting trees provides an
excellent learning experience as well as enhancing the school
environment and encourages an early interest in trees and green spaces.
The New Tree Planting Guidance for Schools gives advice for successful
establishment and maintenance of trees on school grounds.
12
Tree planting is encouraged and supported on
school grounds following the same principles set
out for other open spaces
Policy – planting in schools
©PKCT
Page 66 of 86

Page 67

3.5 Grow Wild Areas
‘Grow Wild’ Areas present a valuable opportunity to bring additional
interest to the area, enhance biodiversity, wildlife habitats and allow
space for trees to grow and thrive. Tree planting will be considered
as part of the development of new and existing permanent Grow Wild 
areas e.g. suitable park margins and steep ground.
To enhance biodiversity, trees should be native and encourage
dependent species of plants and animals. Native trees with attractive
features (e.g. colourful blossom) can improve the visual impact of
Grow Wild areas. Trees should be varied in species and age to
strengthen ecological resilience, be low maintenance, and must be
able to survive in a grassland environment.
Species must be appropriate for space available and type of site and
if space is limited, small and native trees such as Rowan, Hawthorn,
Field maple and Crab apple can be used. These areas are also ideal
for wildlife corridors, and the planting of native blossoms will
encourage biodiversity. Fruit, ornamental or memorial trees can also
be planted in areas permanently designated as Grow Wild.
Not all Grow Wild sites are appropriate for additional tree planting,
with the suitability being dependant on other site characteristics
such as distance to buildings or  where access is required for grounds
maintenance.
Please visit the Council website to find out more about ‘Grow Wild’
13
Trees will be planted within selected
Grow Wild areas to enhance biodiversity
and wildlife habitat
Policy – tree planting & Grow Wild
Page 67 of 86

Page 68

3.6 Orchards & Food Growing
Many communities have a history of fruit growing and orchards
throughout Perth and Kinross. Orchards are shared resources, often
managed by local residents. Besides food production, they can
contribute to improving and creating habitats and build resilience
against urbanisation and climate change impacts. Orchards are
normally identified as areas where there is a minimum of 5 fruit
trees.
Soft fruits within hedgerows adds to diversity, feeding people and
wildlife. They maybe located within parks, school grounds or
woodland areas where there is sufficient space. Individual fruit
trees can be incorporated into ‘Grow Wild’ sites or as part of other
park development projects to further enhance amenity and
biodiversity value.
Fruit trees will not be planted where dropped fruit will fall on hard
surfaces or amenity areas such as shrub or herbaceous borders. 
They will  not be  planted where insects are likely to cause a
nuisance to other park uses such as picnic areas.
The Food Growing Strategy encourages people to grow food locally
including on Council owned and managed land. The Council,
through their Community Food Growing Officer, supports planting
and management of fruit trees or small orchards in suitable
locations where community groups have shown interest and are
able to maintain them.
14
The Council will support community groups in the
planting of fruit trees or orchards where there is
suitable space and public interest
Policy – planting fruit trees & orchards
Page 68 of 86

Page 69

3.7 Green Corridors
Green corridors are usually relatively narrow strips of greenspace
associated with off road active travel routes for people in urban and rural
areas. They can also provide important routes and habitats for wildlife to
move through and between areas avoiding barriers and hard surfaces.
Tree planting should enhance pathways without causing obstruction or
damage to the surfaces from roots, branches or excessive debris. Planting
should maximise wildlife interaction and biodiversity whilst ensuring
sufficient access for maintenance of any infrastructure.
Care must be taken to ensure the trees are appropriate for the space
available to avoid future problems for neighbouring properties or land
uses.  They should also ensure that the corridor remains safe and
welcoming for users, avoid creating dark or concealed areas or blocking
lighting. Native trees such as Wild Cherry, Whitebeam, Rowan, Hawthorn,
Crab Apple and other Malus and Prunus species all add blossom and
natural colour.
Dense planting of trees or shrubs may be used along the edge of water
courses or at the edge of ponds to dissuade entry to the water and
encourage biodiversity.
15
Trees will be planted in ‘Green Corridors’ where
they enhance their amenity value and improve
wildlife connectivity
Policy – planting in green corridors
Page 69 of 86

Page 70

3.8 Council Land within Residential Areas
Large areas of Council managed land in Perth and Kinross lie within
residential areas. Trees within existing housing estates can form a
core part of the identity of an area, adding character, wildlife benefit
and interest to a neighbourhood. Additional benefits often include a
reduction in surface water flooding and can act as wind or noise
buffers. They may also act as a corridor for wildlife where
greenspaces have otherwise been fragmented through development.
Planting of open areas is therefore encouraged in otherwise unutilised
areas of greenspace within housing areas but must follow the
principles described throughout this policy. Trees should be planted in
such a way as to avoid obstruction of sight lines or interference with
any existing recreational use of the site. For housing areas in
particular, the guidance within 3.10 Trees Next to Buildings, Gardens
and Utilities section must be followed. For any new planting likely to
be contentious, the Council will consult with the neighbours and
potential site users.
Guidance is available to developers of new sites in the Open Space
Provision for New Developments Supplementary Guidance.
16
Trees will only be planted within housing areas
where there is sufficient space to avoid long term
adverse impacts on buildings, residents and
infrastructure
Policy – planting in existing residential areas
Page 70 of 86

Page 71

3.9 Street and Urban Planting
Street & urban trees offer amenity value, shade and carbon
sequestration in areas that may otherwise have limited or no
greenspace. A wider variety of species can be used, both native and
non-native, for street planting to provide visual interest.
Additional care is required when choosing the correct species for an
urban environment to ensure that nuisance issues such as aphid drop,
bird droppings and leaf and fruit litter do not create additional
maintenance burdens, and that roots will not damage pavements or
road surfaces. Where space is limited, fastigiate (where branches are
more or less parallel with the main stem) varieties of native trees
(see appendix 1) are an ideal choice for urban environments and are
especially suitable for avenues and around parking areas.
Street trees face more challenging environmental factors, such as
pollution and increased human interaction leading to increased levels
of stress, so greater preservation and aftercare features may be
required (see 4.3 Establishment and Maintenance), such as watering
access and tree guards. Trees may be planted in containers in urban
environments to prevent root compaction and stem damage from
heavy footfall. Tree species intolerant to higher salt exposure from
street gritting or higher pollution levels may not be suitable for all
street planting. Salt tolerant natives are indicated in appendix 1.
Higher levels of maintenance and regular pruning are required to
maintain public access and clearance for roads, streetlighting and
CCTV (table 2).  Resources for additional maintenance must be
confirmed prior to planting.
17
Trees planted in streets will be done as part of an
approved masterplan with details agreed prior to
implementation and adoption
Policy – Street & urban trees
Street feature Minimum clearance
Pavements and public access routes 2.4m height
Highways and public roads 5.3m height
Cycle paths and bridleways 3.0m height
Table 2. minimum clearances required for access
Page 71 of 86

Page 72

3.10 Trees next to Buildings, Gardens and Utilities
Correct planting distances and spacing are essential for new trees to
avoid ‘nuisance’ issues of blocked light, overshading, damage to
guttering and facias or debris drop. While trees are essential to
biodiversity and public wellbeing, consideration of potential negative
impacts on neighbouring properties must always be considered to
prevent these nuisance issues and possible third-party damage to
trees.
These guidelines apply to planting within all areas except for urban &
street tree planting which may be planted be closer to buildings (see
3.9 Streets and Urban Planting).
The mature height and canopy spread of any trees being planted,
rather than the height at planting, must be considered before
planting in the vicinity of buildings, gardens or infrastructure.
Smaller trees or shrubs may help provide a visual buffer and wildlife
value but should follow the same principle.
These guidelines should not prevent the planting of trees near
neighbouring properties but emphasise the importance of correct
species choice. 18
The Council will only plant trees where they will
not impact buildings, overhang gardens or
interfere with utilities infrastructure
Policy – Trees next to buildings  Trees should be planted at least their anticipated mature height
away from buildings
 Trees should be planted at least half their anticipated mature
height away from boundaries
 Trees with limited root intrusion and slow growth should be used
where possible (appendix 1)
 Tree planting should not cause excessive shading of neighbouring
gardens or properties
 Trees planted to the south-west of any building where shading of
the building or garden from the evening sun is likely to be a
nuisance will need to be planted further from the boundary if
this will otherwise result in excessive shading
 Planted trees must not impact on solar panels of neighbouring
properties
 Consider shorter or fastigiate tree species when planting close to
buildings
 Trees may need to be planted further away than these guidelines
in circumstances where nuisance issues would otherwise be
unavoidable
 Any trees planted near buildings will comply with the British
Standard BS5837:2012 (appendix 3).
Page 72 of 86

Page 73

Trees next to Buildings, Gardens and Utilities cont.
Service checks must be carried out before any planting is to take
place for the presence of both underground utilities (drainage pipes,
electrical and fibre cables and gas supplies) and overhead utilities
(high and low voltage cabling and telephone lines).
Subsoil utilities are often only 350-450mm deep and may be
susceptible to damage from roots, while the canopy of the tree can
cause interference or damage to overhead utilities. Sufficient
clearance should be given to allow for maintenance of any of these
utilities.
19Page 73 of 86

Page 74

4.0 Planting, establishment & maintenance
20
In this section:
4.1 Planting Stock 
what size of tree can be planted and where does the Council get their
trees from
4.2 Planting Methods
how and when are trees best planted
4.3 Establishment & Maintenance
what maintenance is done to ensure the trees remain healthy
3.4 Planting Protections Flowchart
what protections are put in place to prevent damage
Page 74 of 86

Page 75

4.1 Planting Stock
The Council grows a wide selection of native trees at Westbank Nursery,
Perth. This stock of trees will be used for all planting on Council land
wherever possible. Trees may be not always be readily available from
Westbank when specific sizes or species are required and will be sourced
externally from approved suppliers. All stock will meet BS 3936- 1 Nursery
Stock Specification (appendix 3).
Correctly specified trees are more likely to establish quickly and have
better survival rates. Planting stock is provided in a variety of forms
ranging in size from bare rooted whips, pods and potted, to heavy
standards. Most trees will be planted as bare rooted transplants or ‘whips’
during the correct planting seasonal range, normally November to March.
Younger trees planted in bare root form will generally have a higher chance
of survival, if planted correctly with proper protections, as the whip will
more easily adapt to its environment relative to a container grown tree.
However, a range of age and sizes will be planted, with older trees being
required for certain areas or projects (Table 3).
21
All planting will be sourced from in-house stock
at Westbank where possible. Other trees will be
sourced from approved suppliers
Policy - planting stock
Tree size When to use
Whip - between 2 to 4 years
old, unbranched, normally
bare rooted
When a large number of trees or
dense planting is required e.g.
planting of large  area or woodland
expansion
Potted – A container grown
tree, often non-native
For container growing in urban
raised tree beds
Standard – normally standing
at a height of approximately
6ft
As a landscaping feature in planned
groups or linear focus areas and
avenues
Heavy Standard - showing
branch growth and the
beginnings of a full crown.
Usually 7-9ft in height
As individual plantings in either
urban or park environment. Suitable
to use for memorial tree planting
Extra Heavy Standards/Semi
Matures – over 9ft in height
with significant branch and
crown development
As a distinctive feature tree,
especially within a heavy footfall
environment or as an exceptional
memorial tree
Table 3. When to use different size trees
Page 75 of 86

Page 76

4.2 Planting methods
The specific planting method will vary depending on site conditions, tree
species and stock size. Planting is best carried out between October and
March to give the best survivability for any newly planted tree. All stock,
regardless of size, should be inspected for signs of disease or damage
before planting.
Whips will be planted in slots or notches using a spade to make a narrow
cut in the soil, and protection will depend on site location (see table on
page 24 for protection specifications). If whips are planted in a fenced,
herbivore proof protected area, then normally they will require no further
protection, although this is only recommended for large-scale planting.
Standard trees will be planted in square or rectangular pits, pricked on all
sides and relevant staking and guards put in place.
No feed should be included in any tree planting, as this can promote
shallow root growth and the salinity will damage delicate root systems
although leaf mould may be included in the planting of standards. To
reduce competition from weeds and promote tree growth, mulch should
be used around the planting area to a depth of 3-4cm not in contact with
the plant stem itself. Mulch mats are ideal for this purpose. Any minor
formative pruning of the branches or roots should be carried out at the
planting stage.
Irrigation piping, planting guys and more elaborate planting protection
may be used in the  case of specimen trees. Trees in street environments
may also be planted in containers and adequate drainage through gravel
layers and trough perforations must be considered.
More detail on pit sizes and protection guidance is given in the table on
page 25.
22
Planting will be done during the correct season,
using the right stock type and species and
methods to promote survivability
Policy – planting
Page 76 of 86

Page 77

4.3 Establishment and Maintenance
The successful establishment of newly planted trees is largely
dependent on following good planting and maintenance
practices within the first 3 years. Good practice includes weed
management, herbivore control, staking and watering during
dry periods (see chart on page 24).
Trees will be planted in accordance with BS8545 (appendix 3).
Trees being staked and tied must be done using adjustable
ties. Incorrect use of tree ties, stakes or tree guards will
reduce survivability of trees. Regular monitoring and removal
of tree protections, once established, will improve the success
of newly planted trees. Tree ties and stakes must be secure
but loose enough to allow growth. Formative pruning after
planting will ease future maintenance and help prevent tree
intrusion
23
Trees on Council land will be planted following
best practice and relevant British Standard,
BS8545
Policy – establishment
Trees will be maintained with weed and
herbivore control and regularly monitored
until well established
Policy – maintenance
Machine mowers and strimmers must not be used close to the
base of trees to avoid stem damage and invigoration of grass,
which will compete with plantings for water and nutrients.
Guards will be regularly inspected and removed after 3 years,
when they become brittle, break or start to restrict growth.
Trees will also be kept weed free for 3 years through mulching
and/or hand weeding, or until their canopy circumference is
greater than the weed free soil area. Trees will be during
periods of prolonged dry weather within the first year of being
planted. A tree is considered established once it demonstrates
consistent growth, is producing new buds and remains firm
when it is gently pulled from above.
Underground guying might be considered to increase resilience
to high winds while tree barriers, pits or containers may
prevent root damage to pavements and roads.
Requirements will vary by tree size, site and environmental
conditions and are summarised in table 4 on page 23.
Page 77 of 86

Page 78

Establishment and Maintenance cont.
24
Tree size Dimensions Tree pit
requirements
Minimum /
recommended
protection
Aftercare and  maintenance Inspection period
Whip Unbranched,
bare root
N/A Spiral guard and cane Remove guards if restricting or brittle.
Inspect every 6 months until established
Initially 3-6 month
Until established
then annually
Potted 2-3ft high 1.5 x pot rooted
diameter
Stake Water to establish in line with shrub planting
Keep base weed free within pot
6 monthly
Standard 6-7ft high,
feathered
450 x 450 x 300mm Mulch, tie and stake,
guards if required.
Water at time of planting and during prolonged
dry spells. Remove guards after 3-5 years.
Keep base weed free within 0.5m of stem
6 monthly until
established then
annually
Heavy Standard Beginnings of
crown, 7-9ft
High
600 x 600 x 500mm Mulch, tie, stake or
multi stake. Ornate
guard in street
environment.
Water at time of planting and during prolonged
dry spells. Remove guards after 3-5 years.
Keep base weed free within 0.5m of stem
6 monthly until
established then
annually
Extra Heavy
standard
Maturer crown,
9-11ft high
700 x 700 x 500mm Mulch , tie, stake or
multi stake with
architectural guard.
Water at time of planting and during prolonged
dry spells. Remove guards after 3-5 years.
Keep base weed free within 0.5m of stem
6 monthly until
established
Table 4. Required maintenance for newly planted trees by tree size
Page 78 of 86

Page 79

4.4 Planting protections flowchart
25
Protections for newly planted trees
Herbivore
management
Environment
protection
Watering and
nutrient addition
Weed
control
Place loose mulch
or mulch mats at
the base when
planting
Hand weed around
base of tree
For standard trees
or larger, install
watering tubes
when planting
Water trees during 
dry periods,
particularly within
the first year of
being planted
Use tree guards
for whips or
small trees
Remove tree
guards and stakes
once tree is well
established
Use stakes and
adjustable tree ties
to support trees in
high winds
Adjust tree ties as
tree grows to prevent
choking (minimum 1x
per year)
Larger trees may
require metal mesh
guards where
beavers are present
Page 79 of 86

Page 80

5.0 Memorial Trees
Memorial trees are a popular way to remember and commemorate a
person or significant milestone. The Council provides the opportunity
to plant trees within Council land with a memorial plaque.
The species and location of the tree(s) to be planted will be agreed
between the requester and Community Greenspace. Not all sites will
be suitable for the planting of memorial trees, but Community
Greenspace will be able to help find an appropriate location. Most
memorial trees will be planted in parks and other amenity
greenspaces only where suitable space is available, and any tree
planted should follow the guidance within this policy specific to the
site they are being planted in. Once a suitable site and tree has been
agreed, Community Greenspace will organise the planting of the tree
and arrange any required aftercare. All costs will be paid by the
requestor and settled up front before planting can take place.
The Council will be offering bird and bat boxes as an alternative to
tree planting. For more information, please refer to the Memorial
Bench & Trees Policy (to be updated 2026).
26
The Council offers the opportunity to
plant trees in selected locations in
remembrance or commemoration
Policy – memorial tree planting
Page 80 of 86

Page 81

6.0 Data Recording
The Council are working towards producing a comprehensive record
of all trees planted on Council land. The information recorded will
include the location and date of planting, species and size of tree,
any tree protections installed and a timeline for any routine
maintenance including removal of tree protections. Planting data can
be recorded by all relevant Council staff and will be publicly
accessible.
Combined with data captured for any tree removals, site surveys and
Ash Dieback surveys, this will provide an overview of the Council’s
tree inventory and species composition. Accurate analyses of carbon
sequestration & survivability rates will be possible, and any long-
term trends can be easier identified at a local and Council-wide
level.
27
All newly planted trees will be recorded digitally
and mapped on ArcGIS
Policy – data recording
Page 81 of 86

Page 82

7.0 Volunteering for Tree Planting
The Council supports a large number of greenspace volunteer groups
in most communities throughout Perth and Kinross including bloom
groups, path groups, park groups, friends of cemetery, allotment
groups and more. All these volunteers and other interested groups
are encouraged to take part in community planting. The Council can
offer support through organised planting events and training in tree
planting, aftercare and maintenance.
For more information about volunteering with Community
Greenspace, please see the Volunteering with Community
Greenspace webpage.
The Perth and Kinross Tree Wardens help to plant and monitor trees
within Perth & Kinross. The Tree Wardens are supported by the
Tayside Biodiversity Partnership who aim to conserve and enhance
the biodiversity.
28
©PKCT
Page 82 of 86

Page 83

8.0 Useful links and advice for Council services
29
While trees within different sites may be managed by different Council Services (e.g. Housing & Communities, Education &
Learning), the same good practice and principles apply to all Council land, including tree planting. Community Greenspace can
offer specialist advice to all services within the Council including tree planting, removal, tree work standards, illegal felling,
identification of dangerous and diseased trees and general tree health.
Community consultation is undertaken as part of any project or in the development of management plans for or within the
Council’s public greenspaces. This may include park upgrades, implementing the Forest Plan and planting activities that may
impact the use of any open space or affect neighbouring properties.
Active and previous public consultations can be found at the Perth & Kinross Council Consultation Hub.
Community Greenspace can be contacted by email at:
treeandwoodlands@pkc.gov.uk
communitygreenspace@pkc.gov.uk
Other resources are available within the Council including the Climate Change team and, for issues related to TPOs or Conservation
areas, Planning Enforcement
Perth and Kinross Climate Action
Trees and Tree Preservation Orders
Page 83 of 86

Page 84

Appendix 1 – Trees & Shrubs native to Scotland
Alder ◊  Alnus glutinosa
Silver birch ∆ Betula pendula
Downy birch  Betula pubescens
Hazel =  Corylus avellana
Hawthorn ◊  Crataegus monogyna
Broom   Cytisus scoparius
Spindle  Euonymus europaeus
Ash *   Fraxinus excelsior
Holly ◊  Ilex aquifolium
Juniper ◊  Juniperus communis 
Crab apple + = Malus sylvestris
Scots pine ◊  Pinus sylvestris
Black poplar  Populus nigra
Aspen ◊  Populus tremula
Gean =  Prunus avium
Bird cherry ∆ = Prunus padus
Blackthorn  Prunus spinosa
Sessile oak   Quercus petraea
Pedunculate oak  Quercus robur
Red currant   Ribes rubrum
Erect-spiked red-currant Ribes spicatum
Hairy dog rose  Rosa caesia caesia
Glaucous dog rose  Rosa caesia Vosagiaca
Dog rose   Rosa canina
Soft downy rose  Rosa mollis
Sweet briar   Rosa rubiginosa
Sherard’s downy rose Rosa sherardii
Harsh downy rose  Rosa tomentosa
Raspberry   Rubus idaeus
Eared sallow   Salix aurita
Goat willow   Salix caprea
Grey willow   Salix cinerea
Dark leaved willow  Salix myrsinifolia
Bay willow   Salix pentandra
Tea-leaved willow            Salix phylicifolia
Purple willow  Salix purpurea
Elder =   Sambucus nigra
Rowan  ◊ + ∆   Sorbus aucuparia
Yew + ∆   Taxus baccata
Small-leaved lime ∆ Tilia cordata
Gorse    Ulex europaeus
Western gorse  Ulex gallii
Wych elm   Ulmus glabra
Guelder rose   Viburnum opulus
30
* Not to be used - suitability as planting stock suspended due to Ash Dieback
+ Slow growing species with non invasive roots suitable for planting in vicinity to buildings
◊ Salt tolerant species
∆ Available in fastigiate form
= Blossom in Spring / early Summer Page 84 of 86

Page 85

Appendix 2 – Council sites with management plans
The Birks of Aberfeldy
The Knock, Crieff
The Den o’ Alyth
Perth City Lade
31
Inchture Park
Kingoodie Quarry
Invergowrie Park
Invergowrie Roadside Strip
Muirton and Inveralmond Woods, Perth
Bellwood and Norrie-Miller Parks, Perth
Craigie Woods, Perth
Kinnoull Hill, Perth
Moncrieffe Island, Perth
Oakbank and Burghmuir, Perth
St Magdalene’s Hill, Perth
North Inch, Perth
South Inch, Perth
Tulloch Woods, Perth
Viewlands Reservoir Park, Perth
Jeanfield Cemetery, Perth
Den O’Alyth
Larghan Park, Coupar Angus
Scone Public Park
Loon Braes, Davie Park, Keith Bank and Riverside, Blairgowrie
Birks of Aberfeldy, Riverside and Victoria Park
Black Spout Wood, Pitlochry
Tom na moan Park, Pitlochry
Luncarty Woods
Lady Mary’s Walk, Crieff
MacRosty Park, Mungall Park and Taylor Park, Crieff
Puddock Wood, Crieff
The Knock of Crieff
Jubilee Park, Dunkeld
Provost’s Walk and Primrose Park, Auchterarder
Abernethy Glen
Springfield Park, Kinross
Sites within the PKC Forest Plan 2015-2035 are:
Sites with individual management plans are:
Kinnoull Hill, Perth
MacRosty Park, Crieff
Larghan Victory Park, Coupar Angus
Victoria Park, Aberfeldy
Page 85 of 86

Page 86

Appendix 3 – BSI Standards Publications
32
British Standard Description
BS 3936 Nursery Stock Specification for Trees and Shrubs
Sets out specifications for quality, size and labelling of trees and shrubs
BS 8545 Trees from nursery to Independence
Covers approved planting guidelines using new plantings while covering aspects of
nursery production
BS 5837 Trees in relation to design, demolition and construction
Specifically, recommendations regarding planting trees in vicinity of buildings
Information on all British Standards for tree are available at the BSI website
Page 86 of 86