Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, 
free from poverty and inequalities

Page 2

©
Gunther Tschuch
Mobility Strategy Action Plan

Page 3

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 1
Contents
Mobility Strategy Action Plan 2
1.       Introduction 3
1.1     Purpose of This Document 3
1.2     Policy Context 4
1.3     Perth and Kinross  5
1.4     Methodology 6
1.5     Document Structure 6
2.       Developing the Action Plan 7
2.1     Case for Change 7
2.2     Transport Planning Objectives 8
2.3     Developing the Long List of Actions 10
2.4     Developing the Final List of Actions 11
2.5     Developing Themes  12
3.       Action Plan 15
3.1     Behaviour Change, Education and Awareness 16
3.2     Accessibility and Inclusivity  18
3.3     Innovation and Future Mobility 20
3.4     Public Realm 22
3.5     Organisation, Planning and Regulations 24
3.6     Road Network 26
3.7     Sustainable Transport 28
3.8     Business-As-Usual and Committed for Delivery 32
4.       Summary 34
5.       Implementation Plan 36

Page 4

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
2
Mobility Strategy Action Plan Contents
• Purpose of this
Document
• Policy Context
• Perth and
Kinross
Transport
Network
• Methodology
• Document
Structure
1. Introduction
• Case for
Change
• Transport
Planning
Objectives
• Developing the
Long List of
Actions
• Developing the
Final List of
Actions
• Developing
Themes
• Public
Consultation
• Appraisal
• Delivery Plan
2. Developing
the Action Plan
• Behaviour
Change,
Education and
Awareness
• Accessibility and
Inclusivity
• Innovation and
Future Mobility
• Public Realm
• Organisation,
Planning and
Regulations
• Road Network
• Sustainable
Transport
• Business-as-
Usual and
Committed for
Delivery
3. Action Plan
• Summary
4. Summary
• Final list of
actions
5.
Implementation
Plan

Page 5

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 3
1. Introduction
1.1 Purpose of This Document
The Mobility Strategy sets out Perth
and Kinross Council’s (PKC) vision
for managing and developing the
transport network. The Mobility
Strategy considers all modes of
transport, for the movement of goods
and people, across PKC’s rural
and urban settings, to help achieve
national targets and local objectives.
The Mobility Strategy sets out a vision for
transformational change to transport across the
region and ensure that the Council makes a full
contribution to our climate change commitments
and the transition to net zero carbon.
This Action Plan has been developed in parallel
with the Mobility Strategy and sets out how PKC,
alongside working partners, will prioritise its capital
investment over the next 15 years. The Mobility
Strategy and Action Plan will be key in delivering
two Corporate Plan priorities: tackling climate
change; and a stronger and greener economy.
Figure 1: Perth and Kinross Council area with primary settlements, railway stations, 
strategic road nework and railway lines.

Page 6

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
4
1.2 Policy Context
The Mobility Strategy is one of three place-based
strategies which shape how places develop over
the long-term. This includes the Local Housing
Strategy and the Local Development Plan 3. All
three strategies aim to deliver PKC’s Corporate
Plan vision for a Perth and Kinross where everyone
can live life well, free from poverty and inequalities.
It is crucial to emphasise that the Action Plan
should not be viewed in isolation, but rather, as an
integral component of the environment we live in,
embracing a place-based perspective.
The Mobility Strategy and Action Plan are designed
to align with various national, regional and local
strategies and policies. This includes alignment
with the sustainable travel hierarchy, shown in
Figure 2. The hierarchy promotes walking, cycling,
public transport and bike, car and ride sharing
in preference to single occupancy car use. A full
comprehensive list of strategies and policies can
be found in the Let’s Talk Transport Report.
Figure 2: Sustainable travel hierarchy.
Cycling
Public Transport
Taxis & shared transport
Private car
Walking and wheeling

Page 7

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 5
1.3 Perth and Kinross
Transport Network
We use transport to access our daily activities of
commuting to work or education, visiting friends
and family, going shopping or attending healthcare
appointments. Access improves our physical and
mental wellbeing, supports our economy and
enables tourism.
However, to ensure that people can meet their
daily needs and activities, access needs to be
considered more broadly than only transport. 
For example, land-use and digital aspects have an
influence on how far, if at all, people need to travel.
The three aspects of access (see Figure 3), namely
digital, transport and spatial, have been illustrated
in the figure to the right. For each of the aspects,
the figure lists responsibilities within the control
of PKC and the responsibilities in the control of
other working partners. PKC provides a range of
transport services and supports other services
by working with partners, including Transport
Scotland, Regional Transport Partnerships,
Network Rail and bus and rail operators.
This Action Plan takes into account the mobility-
focused services provided directly 
by PKC and those delivered in partnership.
Figure 3: Three aspects of access: digital, transport and spatial.
PKC Partners
Online Services Mobile
Broadband
PKC Partners
Active Travel Rail
Bus Freight
Parking Trunk Roads
Local Roads
PKC Partners
Planning Residential
Developments
Social housing Commercial
Developments
SpatialTransport
Digital

Page 8

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
6
1.4 Methodology
In its development, the Action Plan takes a whole
place approach that, combined with the other core
strategies, helps deliver the PKC Corporate Plan
Vision. The Action Plan is supported by a robust
appraisal methodology as presented in the steps
opposite.
The Action Plan has been developed 
and informed in line with best practice guidance,
notably:
• Scottish Transport Appraisal Guidance
2008/2022 – to ensure that the plan 
is evidence-based and has been appraised
in a consistent manner reflecting national,
regional and local policies.
• Local Transport Strategy Draft Guidance
2023 – to ensure that the plan allows people
to access their daily activities through the
transport system, the land-use system and
digital connectivity.
A detailed breakdown of the methodology
employed to produce the plan can be found in
Appendix 4 of the Mobility Strategy.
1.5 Document Structure
This Action Plan document has been prepared
in conjunction with the Mobility Strategy Policy
Document and it has been structured around the
methodology used in the preparation of the final
list of actions. The remainder of this document is
organised into the following chapters:
• Chapter 2: Developing the Draft Action
Plan – provides an overview of the rationale
leading up to Action Plan. This covers the
methodology steps one to eight as shown 
in Figure 4.
• Chapter 3: Draft Action Plan – introduces
the Action Plan comprising the final list 
of actions allocated to eight themes.
• Chapter 4: Summary.
• Chapter 5: Implementation Plan.
Figure 4: Steps in Action Plan
methodology.
1 Case for Change
2
Transport Planning
Objectives
3
Developing the
Long List of Actions
4
Developing the 
Final List of Actions
5 Action Plan
6 Public Consultation
7 Appraisal
8 Delivery Plan

Page 9

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 7
2. Developing the Action Plan
This chapter provides the methodology to the development of the Action Plan.
2.1 Case for Change
To develop a robust evidence base to inform the
Action Plan, extensive engagement initiatives have
been conducted with various internal and external
stakeholders.
The Let’s Talk Transport Report carefully 
examines available data to identify problems 
and opportunities in Perth and Kinross’s transport
network. This report takes into consideration 
input from professional and civic stakeholders. 
Since the development of the Main Issues 
Report, data from the Big Place Conversation 
has supported the development of the Mobility
Strategy.
This gives us a full picture of the existing transport
network. This understanding forms the basis for
the Council’s case for change, justifying the need
for improvements.
All engagement undertaken as part of this case
for change has been considered and utilised to
develop the Action Plan.
Summary of engagement for the Mobility Strategy
Big Place Conversation: Engaged 1,259 participants through 121 events, comprising
focused groups and area-based workshops, using place standard principles.
Mobility Strategy Main Issues Report: Gathered 70 consultation responses.
Elected Member Workshop: A dedicated Elected Members workshop on the Mobility
Strategy and its key principles / objectives.
Recurring Professional and Civic Stakeholder Engagement: Collaborated with over
18 partners throughout key project stages (e.g. SEPA, NHS, Nature Scot, and Sustrans).
Tactran’s Regional Transport Strategy Public Opinion Research: Involved 1,069
participants, with 300 from Perth and Kinross.

Page 10

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
8
2.2 Transport Planning Objectives
11 Transport Planning Objectives (TPOs) have
been developed. These frame the desired
outcomes of the Mobility Strategy. 
The TPOs were developed and informed by:
• National Transport Strategy 2 priorities
• Regional Transport Strategy strategic
objectives
• PKC Corporate Plan priorities
• Problems identified in the Let’s 
Talk Transport Report
The Action Plan has been informed 
and developed in alignment with the 11 TPOs. 
The development of the TPOs has been discussed
in more detail in the Mobility Strategy document. Figure 5: Process to develop Perth and Kinross Transport Planning Objectives.
NTS2 
Priorities
RTS 
Objectives
PKC 
Coorporate 
Plan 
Priorities
Existing 
Perth and 
Kinross 
Problems
Perth and 
Kinross 
Transport
Planning
Objectives
Each objective will form the basis for creating an organisational 
framework to inform decision-making, planning, and strategic leadership.

Page 11

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 9
Table 1: Perth and Kinross Transport Planning Objectives.
NTS2 Priorities TPO PKC - Transport Planning Objectives
Reduce
Inequalities
1 To improve the affordability of transport options across Perth and Kinross for all.
2 To improve the ability of rural communities and communities with protected characteristics to
access jobs, education and services.
Take Climate
Action
3 To reduce CO2 emissions produced by transport across Perth and Kinross, by reducing car
kilometres, decarbonising motorised transport and increasing the share of everyday journeys of
people and goods by sustainable and active travel modes.
4 To improve climate resilience across Perth and Kinross’s transport network by reducing the
impacts caused by extreme weather events.
Helps deliver
Inclusive
economic
growth
5 To support economic growth by improving the reliability and efficiency of Perth and Kinross’s
transport network.
6 To support local development that encourages and facilitates local living and sustainable access,
across Perth and Kinross, by achieving an increased active travel and public transport mode split
to and from new developments.
7 To improve the capacity and reliability of alternative sustainable freight and logistic modes across
Perth and Kinross.
8 To improve labour market access through sustainable transport, active travel, and digital
opportunities, to and from Perth and Kinross.
Improve our
health and
wellbeing
9 To improve road safety and perceived safety for all transport users across Perth and Kinross.
10 To improve physical; and mental health within Perth and Kinross through walking, 
wheeling and cycling.
11 To improve air quality across Perth and Kinross’s road network by achieving revocation of both
Air Quality Management Areas and reducing preventable pollutants.
11 Perth and 
Kinross Transport
Planning 
Objectives

Page 12

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
10
2.3 Developing the Long List of Actions
A list of potential actions was developed through
analysis of the problems and opportunities
identified through engagement undertaken. 
This formed the case for change. This ensures that
the Action Plan is promoting a problem-led and
evidence-based approach.
A number of national, regional and local policies
and strategies were also reviewed to supplement
and expand this list to create a robust and well
evidenced long list of 234 actions.
In line with Local Transport Strategy Guidance
and ensuring that people have access to their
daily activities, strategies should be framed
more broadly. These should consider not only
transport, but other non-transport approaches
such as spatial and digital, known as Triple Access
Planning.
©
GettyImages
Digital
Transport Spatial
Figure 6: Three aspects of access.
The Action Plan has been developed using this
approach which considers actions relating to the
transport system (physical mobility) as well as
the land-use system (spatial proximity) and the
telecommunications system (digital connectivity) which
together constitutes a Triple Access System.
A detailed breakdown of the methodology employed
to produce the plan can be found in Appendix 4 of the
Mobility Strategy.

Page 13

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 11
2.4 Developing the Final List of Actions
The Action Plan has been developed and informed
in line with the Scottish Transport Appraisal
Guidance (STAG). STAG represents best practice
guidance for transport appraisals and follows a
structure and methodology that is consistent with
the UK Government’s Green Book.
The STAG methodology provides a robust
framework to evaluate potential transport actions.
STAG assessments are objective-led and seek
to appraise projects and options against defined
criteria.
Each of the 234 actions in the long list were
appraised against:
• PKC’s 11 Transport Planning Objectives;
• STAG Criteria;
• Established national, regional and local policy
objectives; and
• Feasibility, Affordability, and Public
Acceptability.
67 actions were sifted out of the long list as a result
of this initial appraisal. This is due to not positively
contributing to the appraisal criteria above, 
or due to being consolidated into another action 
to address overlaps and repetition.
The final list of actions in the Action Plan 
is 167 actions.
©
Gunther Tschuch

Page 14

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
12
2.5 Developing Themes
Each of the 167 actions in the Action Plan have
been grouped into one of 8 themes that best
reflects what the action relates to, depending 
on mode or type of action. The themes are shown
in Figure 7.
The list of actions in the Action Plan is broken
down between Strategic Actions and Supporting
Actions:
1. Strategic Actions are those deemed significant
and impactful in achieving the TPOs
2. Supporting Actions consist of granular actions
intended to assist and support the delivery of
the Strategic Actions
Each of the actions could potentially be allocated
under numerous themes as there are inevitable
interdependencies in the final list of actions.
Therefore, it is possible that Strategic and
Supporting Actions are not within the same theme.
Timescales
Given the scope and magnitude of the Action Plan, each action will be
developed and implemented over a 15-year timeframe. Some actions will
require business case development and be dependent on external funding,
while others can be executed in the short term.
An indicative delivery timeline overview of all actions per theme is shown in the
table below. Timescales have been estimated on the assumption that all actions
have funding secured and are ready to be delivered.
Table 2: Number of actions per theme and feasible delivery timeline
Overview of Actions
Strategic Actions 47
Supporting Actions 120

Page 15

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 13
Figure 7: Themes for the Perth and Kinross Mobility Strategy Action Plan.
Organisation, Planning 
and Regulations
Measures that propose changes to current
operations or fiscal measures that will
incentivise sustainable transport use. This
includes green procurement, development
of strategies and plans and public transport
pricing.
For example:
• Mode-specific strategies
• Development planning
• Traffic management
• Parking regulation
• Enforcement
Road Network
Measures and schemes that aim to retain
climate resilient networks across PKC and
reduce adverse effects on sustainable
transport modes.
For example:
• Traffic safety schemes
• Bus priority schemes
• Flood protection schemes
Sustainable Transport
Measures and schemes that aim to improve
the conditions and provide more space for
sustainable travel across PKC to enable
modal shift.
For example:
• Cycle parking
• Safety on public transport
• Park-and-Ride locations
Business-As-Usual 
and Committed For Delivery
Projects that are part of PKC’s ongoing
operations as well as projects that have
been committed for delivery with full funding
combined with programme for delivery.
For example:
• Perth Transport Futures Phases 
1, 2 and 3
• Continued operation 
of the bus services
Public Realm
Measures that aim to improve the liveability
and enjoyability of cities, towns and rural
villages across Perth and Kinross.
For example:
• Green and blue infrastructure
• Spaces and opportunities for play
• Connected neighbourhoods
• Access to greenspaces 
and nature
• Pocket places
Accessibility and Inclusivity
Initiatives and projects that aim to make PKC
inclusive and accessible for everyone.
For example:
• Walkable and wheelable city, 
town and rural village centres
• Access at public transport 
interchanges
• Accessibility of buses 
and trains
Innovation and Future Mobility
Measures that aim to make use of 
digitalisation and emerging technologies,
such as Mobility-As-A-Service, on-demand
transport and cycle sharing.
For example:
• Rollout of broadband across PKC
• Development of MaaS
• Recharging and refuelling 
networks
• Technological change 
across PKC
Behaviour Change, Education 
and Awareness
Initiatives, communication campaigns and
programmes that aim to raise awareness
through promoting sustainable transport and
behavioural change.
For example:
• Information and awareness
• Skills training
• Active travel school programmes
• Workplace travel plans
Action Plan Summary

Page 16

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
14
©
GettyImages
2.6 Public Consultation
In the summer of 2024 (28 May – 28 July), PKC undertook a public consultation
exercise seeking feedback on the Draft Policy Document and Action Plan. 
The consultation questionnaire covered questions in relation to the Mobility
Strategy, Transport Planning Objectives and Action Plan. During the consultation
period, the Mobility Strategy gained 72 responses and led to adjustments and
revisions to the Action Plan. For more information on the public consultation,
refer to the Mobility Strategy Appendix 4: Action Plan Methodology Note and
Appendix 5: Consultation Summary Note.
2.7 Appraisal
After the public consultation period, further appraisal work was undertaken on
the final list of actions. This involved a more detailed consideration and appraisal
of the actions, including identification of indicative costs, potential funding
sources, partners as well as action leads. For more information on the appraisal,
refer to the Mobility Strategy Appendix 4: Action Plan Methodology Note.
2.8 Delivery Plan
The Delivery Plan sets out a bank of actions for delivery over the lifespan of the
Mobility Strategy. A range of funding sources will be required to support the
delivery of the Action Plan. Therefore, the Delivery Plan also provides indicative
scales of cost and identifies potential funding sources for the delivery of the
actions. In addition, not all actions within the Action Plan are solely within the
remit of PKC and therefore successful delivery of the actions will involve a
number of existing and new partnerships.
A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
14

Page 17

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 15
3. Action Plan
This chapter introduces the final list of actions for the
Mobility Strategy, and is divided by the 8 themes introduced
above. This chapter will introduce only the strategic actions
and visualise them.
While some actions have been given an indicative location, some of the actions
are council-wide and cannot be related to one geographic location in which
case, they have been centred on the map.
The final list of 167 actions can be found at the end of this document together
with their theme, timescale, cost category and potential partners.
©
Arup

Page 18

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
16
3.1 Behaviour Change, Education and Awareness
Actions under Behaviour Change, Education and Awareness are initiatives,
communication campaigns and skills development programmes that aim to
raise awareness and change travel behaviour. This is by promoting a shift
towards more sustainable modes of transport and ensuring that everyone has
the required skills and knowledge to embrace these modes. This includes
increasing awareness of the revised 2022 Highway Code that gives pedestrians
priority when using the footpath, shared spaces and crossing the road.
3.1.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.1.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
1. Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
2. Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Behaviour Change, Education 
and Awareness
Strategic Actions
73
Implement workshops and training as well as
advertisement and promotional campaigns to
increase awareness of the Avoid-Shift-Improve
Framework, and subsequently increase the
number of journeys made by sustainable travel
modes.
116
Deliver a behaviour change programme that
improves access to bikes for all (including
adapted bicycles, e-cycles and cycle
share) and provides schools, workplaces,
communities and disadvantaged groups with
the confidence and skills to cycle, such that
they can make use of new or existing active
travel infrastructure.
149
Continue to work with local communities,
key stakeholders and resilience groups in the
co-design of projects to build better places
together, while seeking to expand the range
and number of opportunities for co-design by
making use of external funding sources.
Short (1-4 years) 26
Medium (4-8 years) 0
Long (8-15 years) 0
Total number of actions 26
Strategic Actions 3
Supporting Actions 23

Page 19

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 17
73 116 149
©
Chris Hill
Photography
Figure 8: Strategic actions within the theme Behaviour Change, Education and Awareness.

Page 20

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
18
3.2 Accessibility and Inclusivity
Actions under the theme of Accessibility and Inclusivity are initiatives and
projects that aim to make PKC accessible for everyone. This can be by
retrofitting and removing barriers in the existing infrastructure and ensuring
that any new piece of infrastructure takes into consideration the needs of
underrepresented groups, such as the elderly, women, disabled people and
people with accessibility issues.
3.2.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.2.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
1. Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
2. Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Accessibility and Inclusivity
Strategic actions
118
Provide access for all at public transport
interchanges, supporting Scotland’s Accessible
Travel Framework. Roll out a programme of
interchange upgrades by focussing on improved
infrastructure design to, and within bus stations,
and improved information, signage and
wayfinding by upgrading the accessibility and
quality of passenger facilities at existing stations
and stops or, where needed, construction of
new facilities.
124
Work with partners to improve vehicle
accessibility and the integration of buses and
trains by increasing the space to accommodate
persons with disabilities, reduced mobility,
prams and/or cycles.
219
Conduct an accessibility audit on all connections
between key local services. The audit should
focus on the experiences of underrepresented
groups, such as older people, women, disabled
people and people with accessibility issues.
Provide improvements that meet inclusive
design standards for primary facilities and
ancillary infrastructure.
Short (1-4 years) 3
Medium (4-8 years) 7
Long (8-15 years) 0
Total number of actions 10
Strategic Actions 4
Supporting Actions 6

Page 21

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 19
Figure 9: Strategic actions within the theme Accessibility and Inclusivity.
Accessibility and Inclusivity
Strategic actions
232
Support partners to improve the access for
all at public transport interchanges supporting
Scotland’s Accessible Travel Framework.
With partners, deliver a programme of
interchange upgrades by focussing on improved
infrastructure design to, and within railway
stations, and improved information, signage and
wayfinding by upgrading the accessibility and
quality of passenger facilities at existing stations
or, where needed, construction of new facilities.
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 19
232
232
232
232
232
232
124
118

Page 22

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
20
3.3 Innovation and Future Mobility
Actions under Innovation and Future Mobility include measures that aim to make
use of digitalisation and emerging technologies, such as Mobility-As-A-Service,
on-demand transport and cycle sharing to encourage modal shift towards more
sustainable modes of transport. Through triple access planning (see page 10),
especially digital innovation, the schemes also enable connectivity, 
while reducing the need to travel.
3.3.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.3.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
1. Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
2. Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Innovation and Future Mobility
Strategic Actions
37
Encourage, promote and facilitate the roll
out of digital infrastructure, such as fast
broadband/5G across PKC and particularly in
rural areas and those on low incomes in line
with PKC Digital Strategy.
55 Support partners to develop and roll out
Mobility-as-a-Service (MaaS).
119
Support the decarbonisation of Perth and
Kinross’ transport network by ensuring there
are new and expanding recharging / refuelling
networks as well as technological change.
Short (1-4 years) 12
Medium (4-8 years) 8
Long (8-15 years) 3
Total number of actions 23
Strategic Actions 3
Supporting Actions 20

Page 23

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 21
©
GettyImages
Figure 10: Strategic actions within the theme Innovation and Future Mobility.
37 55 119

Page 24

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
22
3.4 Public Realm
The theme ‘public realm’ includes measures that aim to promote more
sustainable modes of transport by improving the liveability and enjoyability of
public realm and connecting neighbourhoods in Perth and Kinross. For example
actions under the theme include improving access to greenspaces and making
connections to blue and green infrastructure, improving the look and feel of
places, and facilitating opportunities for play, recreation and sports.
3.4.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.4.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
1. Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
2. Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Public Realm
Strategic Actions
111
Deliver connected neighbourhoods within
towns and cities to better achieve connected
and more accessible communities following the
20-minute neighbourhood concept, so that as
many people as possible can meet the majority
of their daily needs within a reasonable walk,
wheel or cycle of their home.
159
Develop a rural approach/equivalent to the
20-minute neighbourhood concept in and
around villages and towns to enhance local
accessibility, help tackle societal causes of
inequality, and reduce social isolation and
loneliness.
161
Protect and incorporate green infrastructure
within all new infrastructure schemes and
developments, capitalising on opportunities
across Perth and Kinross to promote active
travel and make connections where possible
to blue and green networks to provide a
multifunctional network with multiple benefits
for climate and nature.
Short (1-4 years) 7
Medium (4-8 years) 2
Long (8-15 years) 0
Total number of actions 9
Strategic Actions 3
Supporting Actions 6

Page 25

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 23
©
Chris Hill
Photography
Figure 11: Strategic actions within the theme Public Realm.
161
111 159

Page 26

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
24
3.5 Organisation, Planning and Regulations
Organisation, Planning and Regulations actions are measures that propose
changes to current operations and planning for mobility in PKC, as well as
fiscal measures that will incentivise sustainable transport use. This includes
green procurement, development of strategies and plans and public transport
pricing. Other actions under this theme includes the development and updating
of various strategies and plans that enable the shift towards more sustainable
mobility in Perth and Kinross. These actions include, for instance, strategies on
active travel, public transport, electric vehicle infrastructure as well as freight,
logistics and deliveries.
3.5.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.5.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
• Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
• Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Organisation, Planning and Regulations
Strategic Actions
11
Update the existing Active Travel Strategy
that works for everyone in line with Transport
Scotland’s Active Travel Strategy Guidance
(February 2023).
This will adopt and combine the vision and
objectives of the Mobility Strategy, Tactran’s
emerging regional active travel network,
and the Perth Cycle Network Masterplan to
complement the radial sustainable corridors
to and from Perth City. Support also, the
development of local masterplans to present
local aspirations, such as Kinross Active Travel
Masterplan.
27
Finalise and deliver an EV Infrastructure
Strategy that will include on and off-street
charging infrastructure and develop a private/
public partnership for delivery and operation.
35
Develop a Strategic Parking Policy to align with
the Mobility Strategy’s vision and objectives
that will assess utilisation, integration, parking
provision, demand, safety and sustainable
transport alternatives. The high-level strategic
framework will enable strategic, tactical and
operational decisions on parking arrangements
to be undertaken using an evidence-based
decision-making process. The Parking Policy
may include, for instance, guidance on
cycle parking requirements and appropriate
storage types, and reduction in car parking
requirements for new developments.
Short (1-4 years) 29
Medium (4-8 years) 5
Long (8-15 years) 0
Total number of actions 34
Strategic Actions 10
Supporting Actions 24

Page 27

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 25
Organisation, Planning and Regulations
Strategic Actions
42
Explore new bus powers (Transport Act 2019)
to meet the needs of residents and visitors
for bus services across the council area. The
interventions may include council-run bus
services, franchised bus services or the council
entering into Bus Services Improvement
Partnerships (BSIPs) with bus operators in the
area. Engage with residents and visitors to
better understand where intervention is needed
most.
59
Promote/support community funding
opportunities that allow for local projects to be
delivered by Communities for Communities to
promote and deliver investment in public and
private services in communities.
60
Update the Council’s Corporate Travel Plan
update to align with the Mobility Strategy’s
vision and objectives to promote the Council
as an exemplary organisation in relation to
active travel and public transport individually as
well as part of MaaS.
67
Work with partners to ensure public transport
is affordable to all, specifically for deprived
communities.
Organisation, Planning and Regulations
Strategic Actions
153
Ensure developments consider place and
prioritise the needs of people before the
movement of motor vehicles in line with
national and local design guidance. This
includes prioritising sustainable and active
travel choices, and including fully accessible
paths and routes which are well connected
with the wider environment beyond the site
boundary.
187
Work with Tactran’s Regional Freight Quality
Partnership to develop a Freight, Logistics
and Deliveries Plan to ensure that logistics and
distribution networks move goods efficiently
and sustainably to businesses and consumers.
This may include, for instance, exploring the
role of consolidation centres along the strategic
road corridors.
188
Develop a Public Transport Strategy to guide
the development of the public transport
system across the region for the benefit of
those visiting, working and living in Perth and
Kinross.
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 25
©
Arup

Page 28

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
26
3.6 Road Network
Measures within the theme ‘Road Network’ include actions that aim to
retain climate resilient networks across PKC, and reducing adverse effects
on sustainable transport modes. These measures include, for instance,
prioritisation of buses on roads, improving road safety through speed limit
reductions and implementing traffic calming measures.
3.6.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.6.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
1. Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
2. Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Road Network
Strategic Actions
32
Together with partners, continue to inspect,
maintain and improve road structures across
Perth and Kinross to retain climate resilient
networks.
84
Continue to develop and implement bus
priority measures. Measures may include
infrastructural improvements as well as
enforcement of traffic regulations to facilitate
the provision of efficient bus service with
improved journey times.
121
Support partners to deliver measures to reduce
the adverse effects of trunk road traffic on
people walking, wheeling and cycling in those
communities that have a trunk road passing
through them by, for example, reducing traffic
speed, improving the width and quality of
paths and upgrading road crossing facilities.
189
Conduct a traffic safety audit on all major roads
and across all settlements larger than 1,000
residents, within 5km of schools carrying out
improvements based on the findings.
Short (1-4 years) 7
Medium (4-8 years) 3
Long (8-15 years) 4
Total number of actions 14
Strategic Actions 4
Supporting Actions 10

Page 29

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 27
©
GettyImages
Figure 12: Strategic actions within the theme Road Network.
32
189
121
84

Page 30

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
28
3.7 Sustainable Transport
Actions under ‘Sustainable Transport’ include measures and schemes that aim
to improve the conditions and provide more space for sustainable travel across
Perth and Kinross to enable modal shift. Measures include, for example, the
re-allocation of road space towards sustainable modes transport, installation of
cycle parking and exploring the potential for new park-and-ride facilities outwith
town centres.
3.7.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.7.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
1. Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
2. Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Sustainable Transport
Strategic Actions
1
Continue the roll-out of the Perth People Place
Programme to develop sustainable and active
travel corridors within local communities.
2
Make improvements within Perth City Centre
to reduce car dominance and improve
sustainable and active travel choices.
Improvements may consider: parking and
road space reallocation, traffic management
arrangements, connecting services, and
placemaking to optimise traffic flows and the
space available, and improve sustainable and
active travel choices to reduce congestion and
local emissions.
12
Continue to improve on- and off-street public
and residential cycle parking across village,
town and city centres. Ensure that cycle
parking is secure and if feasible, covered.
Secure cycle parking should accommodate
various cycles, such as cargobikes, tricycles,
wide-tyred cycles, cycles with trailers in
addition to providing facilities for storing
accessories, such as saddlebags and helmets
during the duration of parking to encourage
linked trips by active modes.
Short (1-4 years) 19
Medium (4-8 years) 12
Long (8-15 years) 4
Total number of actions 35
Strategic Actions 11
Supporting Actions 24

Page 31

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 29
©
Gunther Tschuch
Mobility Strategy Action Plan

Page 32

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
30 A Perth and Kinross where everyone can live life well, free from poverty and inequalities 30
Sustainable Transport
Strategic Actions
41
Work with bus partners to improve safety on
public transport. This may include enhanced
provision of lighting and CCTV on vehicles
and at key interchanges and along corridors
to increase the perception of safety and
encourage modal shift.
75
Work with partners to improve access to
healthcare and social services for those in the
lowest SIMD datazones, rural communities and
over-65s through improving public transport
frequency, affordability and connectivity to
healthcare facilities.
88
Support the provision of new, relocated and
enhanced train stations where this will improve
access to the rail network and improve
integration within the area being served.
117
Support a programme of improvements,
such as junction upgrades and permissible
speed increases, to achieve journey time
improvements and line capacity increases
for passenger and freight services in line with
STPR2 Tay Cities recommendations and Rail
Services Decarbonisation Action Plan.
Sustainable Transport
Strategic Actions
173
Explore potential for parking areas outwith
town centres across Perth and Kinross,
including Park-and-Ride / Park-and-Choose.
209
Work with bus companies to improve the
experience within bus stations by providing
free facilities such as adequate seating, well
maintained toilets, water refill stations and fast
Wi-Fi.
231
Make improvements within town and village
centres to reduce car dominance and improve
sustainable and active travel choices.
Improvements may consider: parking and
road space reallocation, traffic management
arrangements, connecting services, and
placemaking to optimise traffic flows and the
space available, and improve sustainable and
active travel choices to reduce congestion and
local emissions.
234
Work with rail companies to improve the
experience within train stations by providing
free facilities such as adequate seating, well
maintained toilets, water refill stations and fast
Wi-Fi.
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 30

Page 33

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 31
Figure 13:  Strategic actions within the theme Sustainable Transport.
©
Pexel
173
1
2
117
12
209 41231
88
234
75

Page 34

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
32
3.8 Business-As-Usual and Committed for Delivery
All actions within the Draft Action Plan can be allocated to at least one of the
above themes. However, there are also projects within the Council’s statutory
functions. As such, they form a part of the Council’s existing operations that
should be continued wherever possible in order to ensure continued functioning
of the Perth and Kinross transport network.
There are also projects that have been committed for delivery with full funding
combined with a programme for delivery. Although there are only few projects
meeting this criterion, it is also important to list them to ensure their timely
delivery.
3.8.1 Action Timelines
The actions have been divided
into short, medium and long-
term projects based on how long
implementing each action would
take, provided that funding was
available.
3.8.2 Action Types
The actions have been broken down
between Strategic Actions and
Supporting Actions:
1. Strategic Actions are those
deemed significant and
impactful in achieving the TPOs
2. Supporting Actions consist of
granular actions intended to
assist and support the delivery
of the Strategic Actions
Business-As-Usual 
and Committed For Delivery
Actions
48
Continually assess air quality across Perth and
Kinross to assess any necessary mitigation
measures, such as Low Emission Zones.
186
Continue to implement the Council’s newly
adopted Corporate Asset Management Policy
(CAM Framework January 2024).
223
Continue to monitor and model traffic flows
across Perth City to understand the impacts
of new developments and traffic management
alterations on air quality, and look for
opportunities to align with the regional model.
225
Following the completion of Perth Transport
Futures Phase 1 in 2019, complete Phase
2 (‘Destiny Bridge’ and accompanying
infrastructure) and Phase 3 (Bertha Park North
Link).
226
Ensure the continued operation of the public
transport system to meet the needs of the
residents and visitors across Perth and
Kinross.
227
Continue to ensure that, at minimum,
the designs for transport developments
meet standards and the National Roads
Development Guide (NRDG).
Short (1-4 years) 15
Medium (4-8 years) 0
Long (8-15 years) 1
Total number of actions 16
Strategic Actions 9
Supporting Actions 7

Page 35

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 33
Business-As-Usual 
and Committed For Delivery
Actions
228 Continue the roll out of network improvements
as part of Cycling, Walking and Safer Routes.
229
Continue to develop and deliver the
implementation of on-going behaviour change
initiatives, for example through supporting the
People and Place Programme. Initiatives could
include, for instance, community engagement
(Bikeability Officer, Community Active Travel
Coordinator), bus improvement (Real Time
Passenger Information screens and free bus
days), and marketing and promotion activities
with communities, workplaces and schools.
230
Continue to support and work alongside
partners such as Network Rail, Sustrans, and
Tactran to help operate and enhance existing
transportation systems.
33
186
225
48
A Perth and Kinross where everyone can live life well, free from poverty and inequalities
227226
229228 230
Figure 14:  Strategic actions within the theme Business-As-Usual and Committed for Delivery.
223

Page 36

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
34
4. Summary
This document has explained the development of
the Action Plan as part of PKC’s Mobility Strategy
and presented the final list of actions.
The Action Plan sets out a bank of actions that
can be delivered over the lifespan of the Mobility
Strategy in an effective, coordinated and cost-
effective manner to support future delivery, the
Implementation Plan has been collated to provide
more information on the actions, such as indicative
costs, funding sources and partners. The majority
of strategic actions and corresponding supporting
actions can be developed by a singular team at the
Council, inter-departmental collaboration will be
needed to ensure delivery in an effective and co-
ordinated manner.
The Mobility Strategy sets out a vision for
transformational change to transport across the
region and ensures that the Council makes a full
contribution to our climate change commitments
and the transition to net zero carbon. An
aspirational transport network for Perth City has
been visualised overleaf in Figure 15.
©
GettyImages
A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
34

Page 37

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 35
Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 35
Figure 15: Aspirational transport network for Perth City.

Page 38

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
36
5. Implementation Plan
This is the Implementation Plan with the final list of all 167 actions resulting from the appraisal of the long 
list of 234 actions. The list is organised to show the 47 strategic actions with their supporting actions. 
Each action is accompanied by the allocated theme, timescale, indicative cost, potential funding sources 
and partners for the delivery. Not all actions IDs are present in the tables below due to some actions being
sifted out throughout the appraisal process.
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
1 Continue the roll-out of the Perth People Place
Programme to develop sustainable and active travel
corridors within local communities - piloted by the
Dunkeld Road Corridor. Corridors to be considered:
Glasgow Road
Dundee Road
Edinburgh Road
Perth Road (Scone to Perth)
Sustainable
Transport
Medium High Sustrans,
Transport Scotland
Sustrans, Tactran
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
2 Make improvements within the Perth City Centre ring
road to reduce car dominance and improve sustainable
and active travel choices. Improvements may
consider: parking and road space reallocation, traffic
management arrangements, connecting services, and
placemaking to optimise traffic flows and the space
available, and improve sustainable and active travel
choices to reduce congestion and local emissions.
Sustainable
Transport
Short Medium Innovate UK,
Sustrans,
Tactran,
Tay Cities Region
Deal,
Transport Scotland
PKC

Page 39

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 37
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
11 Update the existing Active Travel Strategy that works
for everyone in line with Transport Scotland’s Active
Travel Strategy Guidance (February 2023).
This will adopt and combine the vision and objectives
of the Mobility Strategy, Tactran’s emerging regional
active travel network, and the Perth Cycle Network
Masterplan to complement the radial sustainable
corridors to and from Perth City. Support also, the
development of local masterplans to present local
aspirations, such as Kinross Active Travel Masterplan.
Organisation,
Planning and
Regulations
Short Low PKC Only Community
Development Trusts,
Sustrans,
Tactran
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
14 Assess and review Core Path Plan path assets and
deliver a programme of improvements.
Sustainable
Transport
Long High Paths for All,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Sustrans,
Tactran

Page 40

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
38
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
17 Work alongside partners Tactran to design and
develop or improve the regional active travel network
to connect Perth and Kinross with other regions, cities
and major gateways using high quality active travel
infrastructure that segregates users form busy roads
and makes use of quiet roads where appropriate.
Business-As-
Usual
and
Committed
For Delivery
Long Very High Sustrans,
Tactran,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Sustrans,
Tactran
18 Support partners in the delivery of National Cycle
Network enhancements to ensure they work for
everyone.
Sustainable
Transport
Medium Low Sustrans,
Transport Scotland
Sustrans
72 Provide high quality and inclusive (i.e. safe, segregated,
direct) active travel infrastructure, focusing on the
delivery of active freeways between Perth City Centre
/ rural areas to employment, health facilities, services,
leisure and tourism activities, to encourage more
people to walk, wheel and cycle more often.
Sustainable
Transport
Medium Very High Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
Sustrans,
Tactran,
Transport Scotland
Cairngorms National
Park Authority,
Community
Development Trusts,
Community
Councils,
Loch Lomond & The
Trossachs National
Park,
Sustrans,
Tactran

Page 41

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 39
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
91 Expand the Green Route Networks by increasing the
number of shared use paths, safer crossing locations
and cycle parking. Green Route infrastructure provides
walking and cycling friendly road links on narrow
country roads between communities with reduced
speed limits to reduce carbon emissions and air
pollution.
Sustainable
Transport
Medium High Cycling Scotland,
Paths for All,
Tactran,
Transport Scotland
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Transport Scotland
92 Develop an Active Travel Monitoring Plan to collect
qualitative and quantitative data on active travel in
Perth and Kinross. Monitor the outputs to evaluate the
impact of active travel investment and levels of cycling
to embed learning in future decisions and schemes.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC
98 Support and promote a toolkit for schools and Parent
Councils to set-up and coordinate bike-trains and
walking-buses easily and effectively.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Organisations
delivering behaviour
change initiatives,
Parent Councils,
Schools
99 Advertise health walks and other programmes to
support people who are less confident about walking
or cycling, and work with Live Active Leisure and
Sustrans to support the projects they undertake in this
area.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Live Active Leisure,
Organisations
delivering behaviour
change initiatives,
Sustrans

Page 42

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
40
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
115 Deliver improved and safer walking, wheeling and
cycling routes to primary and secondary schools,
created through a comprehensive package of
behavioural change measures and local infrastructure
schemes.
Sustainable
Transport
Short High Sustrans,
Tactran
Organisations
delivering behaviour
change initiatives,
Schools,
Tactran
146 Improve/provide active travel crossings that can
accommodate cycling over the River Tay.
Sustainable
Transport
Long High Sustrans,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Sustrans,
Tactran
147 Review National Cycle Network (NCN) and NCN
Development Plan (NDP) intersecting with Perth &
Kinross Council to explore feasibility options to connect
NCN routes.
Sustainable
Transport
Short Low Sustrans Sustrans,
Tactran
195 Conduct a review of signage in relation to existing
active travel routes (e.g. NCN, core paths) and
signposting to key amenities/ services/ attractions/
gateways.
Organisation,
Planning and
Regulations
Short Low Sustrans Sustrans
196 Explore the feasibility and identify appropriate locations
for implementing Cycle Streets (i.e. prioritisation of
cycle users within a mixed street environment with
motor traffic to be treated as ‘guests’) and/or Filtered
Streets (i.e. filtered access for motor traffic while
delivering permeable access for walking, wheeling and
cycling) to encourage active travel.
Road
Network
Short Low Sustrans PKC

Page 43

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 41
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
199 Explore the feasibility and support delivery of expanding
the network of long-distance off-road shared paths for
commuting and recreational travel. This may include
the review of, for example, Countryside Trust's active
travel projects and re-utilisation of disused railway lines
for walking, wheeling and cycling, particularly between
rural settlements.
Sustainable
Transport
Short Low Sustrans,
Transport Scotland
Perth and Kinross
Countryside Trust,
Sustrans,
Tactran
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
12 Continue to improve on- and off-street public and
residential cycle parking across village, town and
city centres. Ensure that cycle parking is secure and
if feasible, covered. Secure cycle parking should
accommodate various cycles, such as cargobikes,
tricycles, wide-tyred cycles, cycles with trailers in
addition to providing facilities for storing accessories,
such as saddlebags and helmets during the duration of
parking to encourage linked trips by active modes.
Sustainable
Transport
Short Low Cycling Scotland,
Sustrans,
Tactran,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Sustrans,
Tactran

Page 44

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
42
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
27 Finalise and deliver an EV Infrastructure Strategy that
will include on and off-street charging infrastructure
and develop a private/public partnership for delivery
and operation.
Organisation,
Planning and
Regulations
Medium Low Energy Saving Trust,
Scottish Futures Trust,
Transport Scotland
ChargePlace
Scotland,
Community
Development Trusts,
Community
Councils,
Tactran,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
207 Together with partners, explore the feasibility of
providing secure off-street cycle parking at public
transport stops and stations. Secure cycle parking
should accommodate various cycles, such as
cargobikes, tricycles, wide-tyred cycles, cycles with
trailers in addition to providing facilities for storing
accessories, such as saddlebags and helmets during
the duration of parking to encourage linked trips by
active modes.
Sustainable
Transport
Short Low Bus Operators,
Rail Operators,
Tactran
Bus Operators,
Network Rail

Page 45

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 43
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
138 Explore the provision of electric car club vehicles (and
associated charging infrastructure) as part of new
housing developments.
Innovation
and Future
Mobility
Short Medium Private Developer
Contributions
Car Club Operators,
Energy Providers,
Private Developers,
Tactran
141 Enable inclusion of an electric car sharing vehicle at the
site of any significant charging infrastructure.
Innovation
and Future
Mobility
Short Medium Car Club Operators,
Energy Saving Trust
Car Club Operators,
ChargePlace
Scotland,
Tactran
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
32 Together with partners, continue to inspect, maintain
and improve road structures across Perth and Kinross
to retain climate resilient networks.
Road
Network
Short Very High Transport Scotland Transport Scotland,
Road Operating
Companies
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
28 Develop an asset management platform (e.g. a
mapping tool), used to highlight the status of the road
network, allowing for a clear and prioritised programme
of work that can be well communicated and easily
shared. This will help find coworking opportunities,
optimise them, and minimise disturbance to existing
live network.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC

Page 46

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
44
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
31 Encourage sustainable procurement options for large
maintenance contracts.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC
33 Together with partners, continue to develop and deliver
Flood Protection Schemes (FPS) under the Flood
Risk Management Strategy - Tay Local Plan District to
reduce flood risk across the identified vulnerable areas.
Ensure to consider transport network resilience and
accessibility issues as well as dwelling flooding.
Business-As-
Usual and
Committed
For Delivery
Short Very High Scottish Environment
Protection Agency
(SEPA),
Scottish Government
Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
Scottish
Environment
Protection Agency
(SEPA),
Scottish Water
148 Ensure new / improved infrastructure avoids increasing
flood risk and reduces risk of flooding.
Organisation,
Planning and
Regulations
Short Very High Scottish Environment
Protection Agency
(SEPA),
Scottish Government,
Transport Scotland
Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
Scottish
Environment
Protection Agency
(SEPA),
Scottish Water

Page 47

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 45
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
150 Integrate sustainable urban drainage systems in design
and placemaking to reduce surface water flooding/run-
off.
Innovation
and Future
Mobility
Short High Private Developer
Contributions,
Scottish Government
Private Developers,
Scottish
Environment
Protection Agency
(SEPA),
Scottish Water
221 Support Transport Scotland on the delivery of
STPR2 recommendation 31 to adapt trunk roads
and motorways to the impacts of climate change
to improve network safety, reliability and resilience.
STPR2 recommends building on existing evidence
around vulnerable locations to develop a fuller picture
of those areas on the trunk road and motorway
network most at risk of disruption due to weather
events. This would provide a basis for identifying,
prioritising and implementing improvements.
Road
Network
Long Low* Transport Scotland Transport Scotland

Page 48

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
46
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
222 Support Transport Scotland on the delivery of Support
STPR2 recommendation 32 to improve reliability,
resilience and safety by renewing and refurbishing
trunk roads and motorways. STPR2 recommends
continued and increased investment in the trunk
road and motorway network over and above current
maintenance levels to keep the network reliable and
resilient for road users. Potential measures would
include, but are not limited to, carriageway and
structure schemes, strengthening of major bridges,
removal of accessibility barriers and development of
integrated transport plans.
Road
Network
Long Low* Transport Scotland Transport Scotland
224 Ensure that the access of agricultural traffic is duly
considered in infrastructure projects.
Road
Network
Short Medium Transport Scotland Transport Scotland

Page 49

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 47
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
35 Develop a Strategic Parking Policy to align with the
Mobility Strategy's vision and objectives that will assess 
utilisation, integration, parking provision, demand,
safety and sustainable transport alternatives. The high-
level strategic framework will enable strategic, tactical 
and operational decisions on parking arrangements
to be undertaken using an evidence-based decision-
making process. The Parking Policy may include, for
instance, guidance on cycle parking requirements and 
appropriate storage types, and car parking 
requirements for new developments.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
36 Implement and enforce pavement parking in line with
the Transport (Scotland) Act 2019.
Organisation,
Planning and
Regulations
Short Medium PKC Only PKC
190 Explore potential of removing, reducing, reallocating
on- and off-street parking across Perth and Kinross
to create space for sustainable and active travel and
public realm.
Public Realm Short Low Sustrans PKC
204 Review the pricing of parking across Perth and Kinross. Organisation,
Planning and
Regulations
Short Low PKC Only PKC

Page 50

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
48
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
37 Encourage, promote and facilitate the roll out of digital
infrastructure, such as fast broadband/5G across
PKC and particularly in rural areas and those on low
incomes in line with PKC Digital Strategy.
Innovation
and Future
Mobility
Medium Low* Broadband Providers,
Scottish Government,
Tay Cities Region Deal
Broadband
Providers,
Tay Cities Region
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
39 Support trialling and the adoption of innovative
technologies and techniques in line with Mobility
Strategy objectives, improving digital accessibility and
thus promoting and delivering investment in public and
private sector services.
Innovation
and Future
Mobility
Short High Scottish Government,
Tay Cities Region Deal
Broadband
Providers,
Tay Cities Region
61 Continue to support hybrid working, encouraging
online video conferencing/training/meetings, reducing
the need to travel for work, and continue to provide the
digital services required.
Business-As-
Usual and
Committed
For Delivery
Short Low Broadband Providers,
Scottish Government,
Tay Cities Region Deal
Broadband
Providers,
Scottish
Government,
Tay Cities Region,
Workplaces
- Medium (50-
249 employees)
and Large (>250
employees)
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 51

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 49
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
41 Work with bus partners to improve safety on public
transport. This may include enhanced provision of
lighting and CCTV on vehicles and at key interchanges
and along corridors to increase the perception of safety
and encourage modal shift.
Sustainable
Transport
Medium Medium Bus Operators,
Rail Operators,
Transport Scotland
Bus Operators,
Network Rail,
Rail Operators,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
151 Work with broadband providers to develop affordable,
sustainable internet access, and with partners such as
social housing providers and caregivers, provide the
residents with training and support to develop basic
digital skills to facilitate reduction in travel demand in
relation to employment and services.
Behaviour
Change,
Education
and
Awareness
Short Medium* Broadband Providers,
Scottish Government,
Tay Cities Region Deal
Broadband
Providers,
Social Housing
Providers,
Tay Cities Region

Page 52

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
50
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
42 Explore new bus powers (Transport Act 2019) to meet
the needs of residents and visitors for bus services
across the council area. The interventions may include
council-run bus services, franchised bus services or
the council entering into Bus Services Improvement
Partnerships (BSIPs) with bus operators in the area.
Engage with residents and visitors to better understand
where intervention is needed most.
Organisation,
Planning and
Regulations
Short Low Tactran,
Transport Scotland
Tactran,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
40 Lobby for central government ring fenced funding
to improve Local Bus Services and to protect lifeline
services.
Organisation,
Planning and
Regulations
Short Low PKC only Tactran
43 Encourage, support and promote Community Bus
Partnerships and Transport Services across Perth and
Kinross to provide a secure and direct transport option
for older people and those with reduced mobility or
disability. Services may include dial-a-bus services,
Community Bike Hubs, community minibuses and
existing schemes, such as the Glenfarg Community
Transport Group.
Sustainable
Transport
Short Low Paths for All Open
Fund,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Community
Transport
Association,
CoMo UK,
Tactran Liftshare
177 Work with bus service providers to provide hopper bus
services around towns and settlements to increase
direct connectivity to key amenities and services.
Sustainable
Transport
Short High Transport Scotland Bus Operators,
Community
Transport Groups

Page 53

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 51
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
48 Continually assess air quality across Perth and Kinross
to assess any necessary mitigation measures, such as
Low Emission Zones.
Business-As-
Usual
and
Committed
For Delivery
Short Low Tactran,
Transport Scotland
Tactran
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
180 Ensure there is a sufficient number of voluntary or
paid bus drivers for community run buses in rural
communities.
Sustainable
Transport
Short Medium Funding sources to be
explored
Bus Operators,
Community
Transport Groups,
Tactran
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
47 Continue to enforce anti-idling. Business-As-
Usual
and
Committed
For Delivery
Short Low PKC Only PKC
164 Keep the City Centre Traffic Management Review
under continual review. The Council's Traffic and
Environmental Teams will liaise regularly to discuss the
effects of component measures of the CCTMR on air
quality.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC

Page 54

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
52
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
55 Support partners to develop and roll out Mobility-as-a-
Service (MaaS).
Innovation
and Future
Mobility
Short Low* Innovate UK,
Tactran,
Transport Scotland
Loch Lomond & The
Trossachs National
Park,
NHS Tayside,
SEStran,
Tactran
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
44 Improve access to bikes for everyone by exploring an
e-bike share scheme by public or private operators, or
by providing support to community action groups.
Innovation
and Future
Mobility
Short Low Cycle Sharing
Scheme Operators
Community
Councils,
Community
Development Trusts,
Cycle Sharing
Scheme Operators
45 Support and encourage partners and communities to
establish Car Clubs.
Innovation
and Future
Mobility
Short Low PKC Only Community
Councils,
Car Club Operators,
Community
Development Trusts

Page 55

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 53
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
110 Work with partners to develop smart, integrated
ticketing and payment services, to modernise, simplify
and enable convenience for passengers accessing
public transport. Provide alternatives (for example,
physical ticket machines) for those without digital
access at key public transport interchanges.
Innovation
and Future
Mobility
Medium High Funding sources to be
explored
Bus Operators,
Rail Operators,
Tactran,
Transport Scotland
137 Work with regional partners to pilot integrated parking
and charging payments through an integrated mobility
platform.
Innovation
and Future
Mobility
Short Medium Innovate UK,
Tactran,
Transport Scotland
Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
Private Parking
Providers,
Tactran
139 Engage with car club operators to address barriers to
greater levels of uptake, e.g. dependence on back-to-
base model.
Innovation
and Future
Mobility
Short Low Car Club Operators Car Club Operators,
Tactran
166 Assess the potential options for smart parking
to facilitate effective location of available parking
spaces, and in doing so, reduce adverse impacts on
congestion and air quality.
Innovation
and Future
Mobility
Short Low Innovate UK,
Tactran,
Transport Scotland
Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
Private Parking
Providers,
Tactran

Page 56

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
54
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
59 Promote/support community funding opportunities that
allow for local projects to be delivered by Communities
for Communities to promote and deliver investment in
public and private services in communities.
Organisation,
Planning and
Regulations
Short Low Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
Paths for All,
Scottish Government,
Sustrans,
Transport Scotland
Community
Councils,
Community
Development Trusts
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
58 Support communities to develop Community
Action Plans which consider transport on a local
scale, allowing for a programme of public-led and
community-led projects to be adopted, optimising
opportunities from a variety of funding streams.
Business-As-
Usual
and
Committed
For Delivery
Short Low Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
Paths for All,
Scottish Government,
Sustrans,
Transport Scotland
Community
Councils,
Community
Development Trusts

Page 57

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 55
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
60 Update the Council's Corporate Travel Plan update to
align with the Mobility Strategy's vision and objectives
to promote the Council as an exemplary organisation in
relation to active travel and public transport individually
as well as part of MaaS.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
152 Grow network of Community Climate Action Hubs,
supporting local communities to develop place-based
approaches to reduce emissions and become more
climate resilient.
Organisation,
Planning and
Regulations
Short Low National Centre for
Resilience,
Scottish Government
Community
Councils,
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Tayside Local
Resilience
Partnership
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
52 Continue to encourage and promote the Council's
car pool scheme as well as optimise the service’s
convenience.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only Tactran Liftshare

Page 58

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
56
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
67 Work with partners to ensure public transport is
affordable to all, specifically for deprived communities.
Organisation,
Planning and
Regulations
Short Medium PKC Only Bus Operators
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
62 Internally promote the Council's Low Carbon Car
Scheme and Cycle to Work Scheme.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only PKC
100 Achieve Cycle Scotland’s Cycle Friendly status as an
employer and advocate that other employers as well
as primary and secondary schools also achieve this
status.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only Schools,
Workplaces

Page 59

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 57
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
57 Continue to subsidise and review Free Bus Travel
schemes: 1) during the lead-up to Christmas and 2)
on the first Saturday of the month during Financial
Year 2024-2025, to encourage and promote public
transport.
Organisation,
Planning and
Regulations
Short Medium PKC only Bus Operators
85 Explore the potential for providing further discounted
travel schemes to support making travel more
affordable.
Organisation,
Planning and
Regulations
Short Low PKC Only Bus Operators,
Tactran
107 Work with partners to undertake a Fair Fares Review (in
line with National review) to ensure a sustainable and
integrated approach to public transport fares.
Organisation,
Planning and
Regulations
Short Low Transport Scotland Tactran,
Transport Scotland
201 Work with communities to provide support in the
process for applying for an under 22's bus pass.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only Community
Councils,
Community
Development Trusts

Page 60

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
58
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
73 Implement workshops and training as well as
advertisement and promotional campaigns to increase
awareness of the Avoid-Shift-Improve Framework, and
subsequently increase the number of journeys made
by sustainable travel modes.
Behaviour
Change,
Education
and
Awareness
Short Low Paths for All,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Community
Organisations,
NHS Tayside,
Schools,
Tactran,
Travel Know How
Scotland,
Workplaces
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
63 Promote Liftshare Scheme through social media and
communication platforms.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only Liftshare,
Tactran
64 Promote 'Love My Bus' campaign through social
media and council communication platforms.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only Transform Scotland

Page 61

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 59
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
76 Provide comprehensive cycle training for vulnerable
groups at all life stages in accordance with the
Council's Active Travel Strategy, including learning to
ride in pre-school, learning to ride on-road through
school Bikeability training, and for adults of all ages,
including cycle awareness training.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Cycling Scotland,
Paths for All,
Tactran
89 Provide accurate and accessible travel information that
is up-to-date and comprehensive including routes,
journey times, timetables, costs and facilities for all
modes. Travel information should be available in both
paper-based and digital formats.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only Bus Operators,
Rail Operators
96 Disseminate information and maps of cycle and
walking routes throughout Perth and Kinross online
and in print format. Include locations of the Green
Route Network, cycle rack locations and other active
travel networks.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only Community
Councils,
Sustrans,
Tactran
97 Work with schools to encourage them to have up-to-
date Travel Plans, and continue to provide support to
schools for implementation of the actions within them.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Organisations
delivering behaviour
change initiatives,
Schools
101 Encourage all secondary schools to promote active
travel to their pupils and expand the role of I Bike or
other similar projects, to facilitate cycling by secondary
school children to and from school as well as for
leisure.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Organisations
delivering behaviour
change initiatives,
Schools

Page 62

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
60
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
75 Work with partners to improve access to healthcare
and social services for those in the lowest SIMD
datazones, rural communities and over-65s through
improving public transport frequency, affordability and
connectivity to healthcare facilities.
Sustainable
Transport
Medium High Private Developer
Contributions,
Scottish Government,
Tactran
Perth and Kinross
Health and Social
Care Partnership,
Private Developers,
Tactran
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
102 Promote Park & Stride sites at schools and seek to
encourage parents/guardians/carers to utilise these
locations rather than parking at the school gate.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Organisations
delivering behaviour
change initiatives,
Schools
140 Engage with car club operators to improve information
(including in-vehicle information) on using electric club
vehicles.
Behaviour
Change,
Education
and
Awareness
Short Low Car Club Operators Car Club Operators,
Tactran
163 Work with regional partners to further encourage
development and employee use of Green Travel Plans
in large workplaces.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Tactran,
Workplaces - Large
(>250 employees)

Page 63

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 61
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
158 With partners, promote the health benefits of outdoor
recreation and GP-led green health referrals.
Behaviour
Change,
Education
and
Awareness
Short Low Funding sources to be
explored
Cairngorms National
Park Authority,
Community
Councils,
Community
Development Trusts,
Loch Lomond & The
Trossachs National
Park,
NatureScot,
Perth and Kinross
Health and Social
Care Partnership,
Scottish Forestry
168 Establish Tayside Physical Activity and Green Health
Network with partners to develop pathways to support
people to be active in their own community.
Behaviour
Change,
Education
and
Awareness
Short Low Funding sources to be
explored
Cairngorms National
Park Authority,
Community
Councils,
Community
Development Trusts,
Live Active Leisure,
Loch Lomond & The
Trossachs National
Park,
NatureScot,
Perth and Kinross
Health and Social
Care Partnership,
Scottish Forestry

Page 64

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
62
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
84 Continue to develop and implement bus priority
measures. Measures may include infrastructural
improvements as well as enforcement of traffic
regulations to facilitate the provision of efficient bus
service with improved journey times.
Road
Network
Medium Very High Funding sources to be
explored
Bus Operators
Tactran,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
169 Provide access for everyone to activities prescribed
by social prescribers and link social prescribers to GP
practices.
Organisation,
Planning and
Regulations
Medium Low NHS Tayside Cairngorms National
Park Authority,
Community
Councils,
Community
Development Trusts,
Live Active Leisure,
Loch Lomond & The
Trossachs National
Park,
NatureScot,
Perth and Kinross
Health and Social
Care Partnership,
Scottish Forestry
179 Improve access for emergency health care in rural
areas where there is concern for the journey time for
ambulances and the lack of doctors in the area.
Road
Network
Short High Scottish Government,
Transport Scotland
Perth and Kinross
Health and Social
Care Partnership

Page 65

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 63
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
88 Support the provision of new, relocated and enhanced
train stations where this will improve access to the rail
network and improve integration within the area being
served.
Sustainable
Transport
Long High* Transport Scotland Network Rail,
ScotRail,
Transport Scotland
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
111 Deliver connected neighbourhoods within towns and
cities to better achieve connected and more accessible
communities following the 20-minute neighbourhood
concept, so that as many people as possible can meet
the majority of their daily needs within a reasonable
walk, wheel or cycle of their home.
Public Realm Medium High Sustrans,
Transport Scotland
Community
Development Trusts,
Community
Councils
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
10 Support partners with the development of the Perth
Railway Masterplan, encourage the integration of the
bus station and other sustainable and active travel
modes.
Business-As-
Usual
and
Committed
For Delivery
Short Low Network Rail,
Tay Cities Region Deal
Network Rail,
Transport Scotland
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 66

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
64
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
68 Create walkable and wheelable city centres and
rural village centres with strategic connections. Early
collaboration with accessibility groups should be
carried out to ensure designs/interventions are fully
accessible.
Accessibility
and Inclusivity
Medium High Private Developer
Contributions,
Sustrans,
Tactran,
Transport Scotland
Centre for Inclusive
Living,
Sustrans,
Tactran
172 Develop pocket places in key areas with cycle
infrastructure and maps / area information, and public
transport timetables.
Public Realm Short Medium Scottish Environment
Protection Agency
(SEPA),
Sustrans,
Transport Scotland
Community
Councils,
Community
Development Trusts
176 Improve connections between village/town centres and
greenspaces to encourage locally made active travel
trips for the benefit of recreation, health and wellbeing
and local economy.
Public Realm Medium Low Sustrans,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Sustrans,
Tactran,
Transport Scotland
181 Explore feasibility to pedestrianise village, town and city
centres on a permanent/seasonal basis to create more
liveable and accessible centres for both residents and
visitors, and to boost local economy.
Public Realm Short Low Sustrans Sustrans,
Transport Scotland

Page 67

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 65
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
116 Deliver a behaviour change programme that improves
access to bikes for all (including adapted bicycles,
e-cycles and cycle share) and provides schools,
workplaces, communities and disadvantaged groups
with the confidence and skills to cycle, such that
they can make use of new or existing active travel
infrastructure.
Behaviour
Change,
Education
and
Awareness
Short Medium Tactran Community
Councils,
Organisations
delivering behaviour
change initiatives,
Schools,
Tactran,
Workplaces
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
206 Integrate art and design within projects to encourage
active travel and enhance public realm by, for example,
exploring ways to incorporate it into empty spaces,
into navigation/wayfinding, and at public transport
interchanges.
Public Realm Short Medium Sustrans,
Tactran,
Transport Scotland
PKC

Page 68

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
66
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
118 Provide access for all at public transport interchanges,
supporting Scotland’s Accessible Travel Framework.
Roll out a programme of interchange upgrades by
focussing on improved infrastructure design to, and
within bus stations, and improved information, signage
and wayfinding by upgrading the accessibility and
quality of passenger facilities at existing stations and
stops or, where needed, construction of new facilities.
Accessibility
and Inclusivity
Medium High Tactran,
Transport Scotland
Centre for Inclusive
Living,
Tactran
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
19 Conduct audits of bus stop and bus interchange
accessibility and security and support partners to
deliver a programme of improvements to enable
increased use and modal shift.
Accessibility
and Inclusivity
Medium High Tactran,
Transport Scotland
Tactran
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
117 Support a programme of improvements, such as
junction upgrades and permissible speed increases, to
achieve journey time improvements and line capacity
increases for passenger and freight services in line with
STPR2 Tay Cities recommendations and Rail Services
Decarbonisation Action Plan.
Sustainable
Transport
Medium Low* Transport Scotland Network Rail,
Rail Operators,
Tactran Freight
Quality Partnership,
Transport Scotland
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 69

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 67
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
119 Support the decarbonisation of Perth and Kinross'
transport network by ensuring there are new and
expanding recharging / refuelling networks as well as
technological change.
Innovation
and Future
Mobility
Medium Very High Energy Saving Trust,
Scottish Futures Trust,
Scottish Government,
Transport Scotland
Energy Providers,
Tactran,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
25 Support Transport Scotland and partners in the
decarbonisation of Scotland's passenger rail services
by 2035.
Innovation
and Future
Mobility
Long Medium* Scottish Government Energy providers,
Network Rail,
Rail operators,
Scottish
Government,
Tactran,
Transport Scotland
46 Support taxi and private hire fleets to decarbonise and
move towards a low carbon fleet.
Innovation
and Future
Mobility
Long Low* Energy Saving Trust,
Transport Scotland,
Scottish Government
Energy Saving Trust,
Scottish Futures
Trust,
Taxi and Private Hire
Fleet Operators
53 Invest in a sustainable/low-carbon council fleet,
including charging/fuelling infrastructure.
Innovation
and Future
Mobility
Medium High Energy Saving Trust,
Scottish Futures Trust,
Scottish Government,
Transport Scotland
Energy Providers,
Transport Scotland
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 70

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
68
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
54 Support partners in exploring hydrogen vehicles and
refuelling facilities through the Tactran and Tayside
Hydrogen Project.
Innovation
and Future
Mobility
Medium Low* Scottish Government,
Tay Cities Region
Deal,
Transport Scotland
Tactran,
Tay Cities Region
56 Support bus operators to decarbonise bus services,
with consideration to charging infrastructure and fleet.
Innovation
and Future
Mobility
Long Low* Energy Saving Trust,
Scottish Futures Trust,
Scottish Government,
Transport Scotland
Bus Operators
142 Continue to participate and support in Tactran's
Regional EV Steering Group forum to share data
and learning from EV deployment to accelerate the
transition and identify barriers to adoption.
Business-As-
Usual
and
Committed
For Delivery
Short Low PKC Only Tactran Regional EV
Steering Group
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
121 Support partners to deliver measures to reduce the
adverse effects of trunk road traffic on people walking,
wheeling and cycling in those communities that have
a trunk road passing through them by, for example,
reducing traffic speed, improving the width and quality
of paths and upgrading road crossing facilities.
Road
Network
Medium Medium* Transport Scotland Community
Councils,
Police Scotland,
Sustrans,
Transport Scotland

Page 71

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 69
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
120 Support partners to progress road safety
improvements across the trunk road and motorway
network with a primary, but not exclusive, focus on
rural sections where accident rates and severities
are typically higher. The types of improvements
would include junction improvements (such as right-
turn priority, signalisation, at-grade roundabout and
grade-separation) as well as junction rationalisation,
realignment/widening of carriageways and provision of
overtaking opportunities.
Road
Network
Long Low* Transport Scotland Community
Councils,
Transport Scotland
220 Support Transport Scotland on the delivery of
STPR2 recommendation 30 to improve trunk road
and motorway safety to progress towards 'Vision
Zero' where there are zero fatalities and injuries on
Scotland’s roads by 2050. STPR2 recommends
road safety improvements are progressed across the
trunk road and motorway network with a primary,
but not exclusive, focus on rural sections where
accident rates and severities are typically higher.
Measures are likely to include one or a combination of
junction improvements, carriageway widening, route
realignment and provision of overtaking opportunities.
The location and type of improvements on specific
routes requires further detailed investigation, potentially
through the development of route action plans.
Road
Network
Long Low* Transport Scotland Transport Scotland
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 72

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
70
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
124 Work with partners to improve vehicle accessibility
and the integration of buses and trains by increasing
the space to accommodate persons with disabilities,
reduced mobility, prams and/or cycles.
Accessibility
and Inclusivity
Short Medium Transport Scotland Bus Operators,
Centre for Inclusive
Living,
Network Rail,
Rail Operators,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
210 Work with operators to provide on board audio-
visual facilities on buses (including naming and
announcement of bus stops) to improve accessibility
for older people and people with visual or hearing
impairments.
Accessibility
and Inclusivity
Short Low* Funding sources to be
explored
Bus Operators
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 73

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 71
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
149 Continue to work with local communities, key
stakeholders and resilience groups in the co-design of
projects to build better places together, while seeking
to expand the range and number of opportunities for
co-design by making use of external funding sources.
Behaviour
Change,
Education
and
Awareness
Short Low National Centre for
Resilience,
Scottish Government
Community
Councils,
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Tayside Local
Resilience
Partnership
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
153 Ensure developments consider place and prioritise
the needs of people before the movement of motor
vehicles in line with national and local design guidance.
This includes prioritising sustainable and active
travel choices, and including fully accessible paths
and routes which are well connected with the wider
environment beyond the site boundary.
Organisation,
Planning and
Regulations
Short Low Private Developer
Contributions
Cairngorms National
Park Authority,
Community
Development Trusts,
Loch Lomond & The
Trossachs National
Park,
Perth and Kinross
Countryside Trust,
Private Developers,
Sustrans

Page 74

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
72
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
49 Build developments where all essentials (shops,
schools, parks) are close by and easily accessible by
sustainable modes of transport to reduce the need to
travel and minimise the use of unsustainable modes.
Interventions will be assessed through the development
management process and need to be proportionate to
the size and location of the development.
Organisation,
Planning and
Regulations
Medium Low PKC Only Private Developers
50 For developments creating significant number of new
trips with no public transport services available, enforce
that the developer provides a subsidised service until
passenger numbers become commercially viable.
Organisation,
Planning and
Regulations
Short Low Private Developer
Contributions
Bus Operators,
Private Developers,
Community
Councils,
Community
Development Trusts,
Taxi and Private Hire
Fleet Operators
81 Work with operators and developers to ensure that
existing and new employment, education, retail,
healthcare, and tourism destinations are serviced by
road-based passenger transport, particularly in rural
areas.
Sustainable
Transport
Short High Bus Operators,
Private Developer
Contributions
Bus Operators,
Private Developers
131 Encourage, promote and facilitate spaces and
opportunities for play, recreation and sport that are
inclusive and enable children and young people to
play and move around safely and independently,
maximising opportunities for informal and incidental
play.
Public Realm Short Medium Greenspace Scotland,
Scottish Environment
Protection Agency
(SEPA)
Greenspace
Scotland,
Community
Councils,
Community
Development Trusts

Page 75

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 73
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
133 Ensure that retail development and the location of
shops can be accessed by communities by a range of
sustainable transport modes including on foot, by bike,
and by public transport.
Organisation,
Planning and
Regulations
Medium Low Private Developer
Contributions
Bus Operators,
Private Developers,
Transport Scotland
154 Ensure developments consider the impact on the path
network and be consistent with the Scottish Outdoor
Access Code.
Organisation,
Planning and
Regulations
Short Low PKC Only Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
NatureScot,
Perth and Kinross
Countryside Trust
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
159 Develop a rural approach/equivalent to the 20-minute
neighbourhood concept in and around villages and
towns to enhance local accessibility, help tackle
societal causes of inequality, and reduce social
isolation and loneliness.
Public Realm Short Low Tactran,
Transport Scotland
Cairngorms National
Park Authority,
Community
Councils,
Community
Development Trusts,
Loch Lomond & The
Trossachs National
Park,
NatureScot,
Perth and Kinross
Countryside Trust

Page 76

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
74
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
184 Expand pavements to the houses on the edges of rural
villages and towns.
Sustainable
Transport
Long High Funding sources to be
explored
Transport Scotland
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
161 Protect and incorporate green infrastructure within
all new infrastructure schemes and developments,
capitalising on opportunities across Perth and Kinross
to promote active travel and make connections where
possible to blue and green networks to provide a
multifunctional network with multiple benefits for
climate and nature.
Public Realm Short Medium Transport Scotland Community
Councils,
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Sustrans,
Tactran,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
128 Undertake a review of nature-based, green and blue
infrastructure interventions which can benefit air quality,
using the outcomes to develop a database of potential
solutions for both regeneration and new developments.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC

Page 77

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 75
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
130 Safeguard access rights and core paths, including
active travel routes, and encourage new and enhanced
opportunities for access linking to the wider active
travel network. Protect and enhance green (land) and
blue (water) infrastructure and their networks.
Organisation,
Planning and
Regulations
Short Low Paths for All,
Transport Scotland
Community
Councils,
Community
Development Trusts,
Perth and Kinross
Countryside Trust,
Sustrans,
Tactran,
Transport Scotland
156 Work with land managers to ensure existing woodlands
are managed and enhanced for a range of benefits,
including public access and biodiversity.
Organisation,
Planning and
Regulations
Short Low PKC Only Cairngorms National
Park Authority,
Loch Lomond & The
Trossachs National
Park,
NatureScot,
Perth and Kinross
Countryside Trust,
Private Land
Managers,
Scottish Forestry,
Woodland Trust

Page 78

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
76
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
173 Explore potential for parking areas outwith town
centres across Perth and Kinross, including Park-and-
Ride / Park-and-Choose.
Sustainable
Transport
Short Low PKC Only Tactran,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
3 Design and deliver a 'City Centre Mobility Hub' to
provide an integrated transport hub in Perth City.
Innovation
and Future
Mobility
Medium High Innovate UK,
Tactran,
Tay Cities Region
Deal,
Transport Scotland
PKC
4 Develop and deliver a 'Strategic Mobility Hub' at
Walnut Grove, to provide local and strategic transport
links with integrated transport choices.
Innovation
and Future
Mobility
Short High Innovate UK,
Tactran,
Transport Scotland
Tactran,
Transport Scotland
5 Develop and deliver a 'Strategic Mobility Hub' at Bertha
Park, to provide local and strategic transport links with
integrated transport choices.
Innovation
and Future
Mobility
Short High Innovate UK,
Tactran,
Transport Scotland
Tactran,
Transport Scotland
6 Continue to enhance and integrate all modes of
transport at the existing Broxden Park and Ride site to
improve sustainable and active travel choices.
Sustainable
Transport
Short Medium Tactran,
Transport Scotland
Tactran,
Transport Scotland
7 Explore the feasibility of expanding the extent and
capacity of existing park and ride sites, such as
Kinross, and integrate all modes of transport at the
locations to improve sustainable and active travel
choices.
Sustainable
Transport
Short Medium Tactran,
Transport Scotland
Tactran,
Transport Scotland

Page 79

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 77
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
8 Explore options for local Mobility Hubs within
rural communities to integrate modes across rural
neighbourhoods and improve public transport links,
identifying arterial bus routes, optimise the Council
bus subsidy budget and working in partnership with
community transport providers.
Innovation
and Future
Mobility
Medium Low Tactran,
Transport Scotland
Tactran,
Transport Scotland
86 Ensure that land identified as having potential for
Park & Ride development is safeguarded within the
appropriate Development Plan(s).
Organisation,
Planning and
Regulations
Short Low PKC Only PKC
185 Improve access to park and ride services for non-car
owners and car owners by, for instance, ensuring there
is a sufficient number of park and ride locations that
are connected with sustainable transport networks in
order to reduce kilometres travelled.
Sustainable
Transport
Short Medium Tactran,
Transport Scotland
Centre for Inclusive
Living,
Tactran,
Transport Scotland

Page 80

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
78
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
186 Continue to implement the Council's newly adopted
Corporate Asset Management Policy (CAM Framework
January 2024).
Business-As-
Usual and
Committed
For Delivery
Short Low PKC Only PKC
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
205 Develop and deliver a seasonal Maintenance Plan
for active travel facilities to clear them of overgrown
vegetation, fallen leaves, snow and ice.
Organisation,
Planning and
Regulations
Short Medium PKC Only Perth and Kinross
Countryside Trust,
Sustrans,
Tactran
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
187 Work with Tactran's Regional Freight Quality
Partnership to develop a Freight, Logistics and
Deliveries Plan to ensure that logistics and distribution
networks move goods efficiently and sustainably to
businesses and consumers. This may include, for
instance, exploring the role of consolidation centres
along the strategic road corridors.
Organisation,
Planning and
Regulations
Short Low Funding sources to be
explored
Federation of
Small Businesses
Scotland,
Network Rail,
Tactran,
Tactran Freight
Quality Partnership,
Tay Cities Region,
Transport Scotland

Page 81

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 79
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
38 Support partners to assess options on last mile freight
delivery and the sustainable movement of goods and
encourage the inclusion of resting and welfare facilities
for haulers within the options.
Behaviour
Change,
Education
and
Awareness
Short Low Logistics Operators,
Transport Scotland
Tactran Freight
Quality Partnership
71 Assess the feasibility of increasing freight transport by
rail.
Organisation,
Planning and
Regulations
Medium Low Transport Scotland Network Rail,
ScotRail,
Tactran Freight
Quality Partnership,
Transport Scotland
123 Engage the business sector to embed active travel
in wider corporate culture, encouraging the use of
cargobikes as the preferred choice for local deliveries
enabling goods to be moved in a green way.
Behaviour
Change,
Education
and
Awareness
Short Low Tactran Workplaces
134 Engage widely across industries to explore and
create opportunities for changing technologies
and innovation, such as addressing grid capacity
constraints, implementing consolidation centres and
integrating renewable energy generation, distribution
and storage to reduce carbon emissions.
Innovation
and Future
Mobility
Medium High* Funding sources to be
explored
Network Rail,
Tactran,
Tay Cities Region,
Tactran Freight
Quality Partnership,
Transport Scotland
143 Work with partners to introduce a scheme to directly
support local businesses to help them understand and
consider the financial and environmental benefits of
driving an electric vehicle.
Behaviour
Change,
Education
and
Awareness
Short Low PKC Only PKC Only
Business Owners,
Tactran,
Tactran Regional EV
Steering Group
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 82

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
80
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
188 Develop a Public Transport Strategy to guide the
development of the public transport system across
the region for the benefit of those visiting, working and
living in Perth and Kinross.
Organisation,
Planning and
Regulations
Short Low PKC Only PKC
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
21 Explore options to align rural public transport services
with rail services (timetabling).
Sustainable
Transport
Short Low PKC Only Bus Operators,
Rail Operators
22 Explore options to improve sustainable transport and
active travel connections to bus and railway stations
across Perth and Kinross.
Sustainable
Transport
Medium Low PKC Only Community
Development Trusts,
Network Rail,
Sustrans,
Tactran
26 Conduct audits of bus stop ancillary infrastructure.
Deliver improvements on the basis of findings to
encourage increase in use. Improvements may
include bus shelters, seating, cycle parking, and
enhancements to legibility, such as digital display
boards with real time information and signage and
wayfinding.
Sustainable
Transport
Medium Medium Energy Saving Trust,
Scottish Futures Trust,
Transport Scotland
Transport Scotland,
Tactran,
Community
Development Trusts,
Community
Councils,
Centre for Inclusive
Living

Page 83

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 81
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
78 Support the development of inter-city bus coach
services supporting links to Aberdeen, Inverness,
Edinburgh & Glasgow.
Sustainable
Transport
Short Low Funding sources to be
explored
Bus Operators
HITRANS,
Nestrans,
SEStran,
SPT,
Tactran,
Transport Scotland
80 Encourage the development of a bus network that
is fit for purpose with direct and frequent services on
strategic bus routes, supported by an appropriate
secondary network of scheduled and demand
responsive (DRT) feeder services and efficient
interchange provision, including linking with rail
services.
Sustainable
Transport
Medium High Tactran,
Transport Scotland
Bus Operators,
Community
Transport
Association,
Demand
Responsive
Transport Providers,
Network Rail,
Tactran,
ScotRail
182 Ensure there is sufficient availability of public transport
services during off-peak times such as weekends and
evenings, particularly in rural areas.
Sustainable
Transport
Short High Funding sources to be
explored
Bus Operators,
Community
Councils,
Community
Transport Groups
213 Work with partners to improve the viability of choosing
to travel by bus, particularly in rural areas. The
improvements may be in relation to reliability and
frequency of bus services.
Sustainable
Transport
Medium High Funding sources to be
explored
Bus Operators

Page 84

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
82
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
189 Conduct a traffic safety audit on all major roads and
across all settlements larger than 1,000 residents,
within 5km of schools, carrying out improvements
based on the findings.
Road
Network
Medium Very High Transport Scotland Police Scotland,
Transport Scotland
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
13 Explore universal speed limit reductions, 20mph
across all residential streets along with further speed
reductions.
Road
Network
Short Low PKC Only Police Scotland
94 Introduce traffic calming measures to reduce the
speeds of motorised vehicles so that residents and
visitors feel safe using the network.
Road
Network
Short Low Funding sources to be
explored
Police Scotland
103 Improve speed limit compliance and further
enhancement of safety across the road network by
following the Scottish National Speed Indicator and
increase the use of visual deterrents and enforcement
across the road network, particularly in areas of high
deprivation and higher than average crash casualties.
Road
Network
Short Low Transport Scotland Police Scotland,
Transport Scotland
125 Reduce road accident casualties by delivering a range
of speed management initiatives, for example social
marketing campaigns or speed awareness, to ensure
that road users understand why speed limits are set
and the need to comply with them.
Behaviour
Change,
Education
and
Awareness
Short Low Transport Scotland Police Scotland

Page 85

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 83
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
209 Work with bus companies to improve the experience
within bus stations by providing free facilities such as
adequate seating, well maintained toilets, water refill
stations and fast Wi-Fi.
Sustainable
Transport
Short Medium Transport Scotland Bus Operators
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
93 Work in collaboration with the Centre for Inclusive
Living to undertake a Street Audit of crossing locations
to identify locations for dropped kerbs to prioritise the
locations where work needs to be carried out.
Accessibility
and Inclusivity
Short Low PKC Only Centre for Inclusive
Living
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
219 Conduct an accessibility audit on all connections
between key local services. The audit should focus on
the experiences of underrepresented groups, such as
older people, women, disabled people and people with
accessibility issues. Provide improvements that meet
inclusive design standards for primary facilities and
ancillary infrastructure.
Accessibility
and Inclusivity
Medium Very High Tactran Centre for Inclusive
Living,
Community
Councils,
Perth and Kinross
Health and Social
Care Partnership

Page 86

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
84
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
223 Continue to monitor and model traffic flows across
Perth City to understand the impacts of new
developments and traffic management alterations on
air quality, and look for opportunities to align with the
regional model.
Business-As-
Usual
and
Committed
For Delivery
Short Low PKC Only PKC
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
225 Following the completion of Perth Transport Futures
Phase 1 in 2019, complete phase 2 (‘Destiny Bridge’
and accompanying infrastructure) and phase 3 (Bertha
Park North Link).
Business-As-
Usual
and
Committed
For Delivery
Short Very High Transport Scotland Transport Scotland
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
226 Ensure the continued operation of the public transport
system to meet the needs of the residents and visitors
across Perth and Kinross.
Business-As-
Usual
and
Committed
For Delivery
Short High Funding sources to be
explored
Community
Councils,
Community
Development Trusts,
Bus Operators,
Network Rail,
Rail Operators,
Tactran,
Transport Scotland

Page 87

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 85
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
227 Continue to ensure that, at minimum, the designs
for transport developments meet standards and the
National Roads Development Guide (NRDG).
Business-As-
Usual
and
Committed
For Delivery
Short Low PKC Only PKC
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
228 Continue the roll out of network improvements as part
of Cycling, Walking and Safer Routes.
Business-As-
Usual
and
Committed
For Delivery
Short High Scottish Government Centre for Inclusive
Living,
Sustrans,
Tactran
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
229 Continue to develop and deliver the implementation
of on-going behaviour change initiatives, for example
through supporting the People and Place Programme.
Initiatives could include, for instance, community
engagement (Bikeability Officer, Community Active
Travel Coordinator), bus improvement (Real Time
Passenger Information screens and free bus days), and
marketing and promotion activities with communities,
workplaces and schools.
Business-As-
Usual
and
Committed
For Delivery
Short High Tactran Bus Operators,
Live Active Leisure,
Organisations
delivering behaviour
change initiatives,
Sustrans,
Tactran

Page 88

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
86
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
230 Continue to support and work alongside partners such
as Network Rail, Sustrans, and Tactran to help operate
and enhance existing transportation systems.
Business-As-
Usual
and
Committed
For Delivery
Short Very High Sustrans,
Tactran,
Transport Scotland
Bus Operators,
Rail Operators,
Sustrans,
Tactran
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
231 Make improvements within town and village centres to
reduce car dominance and improving sustainable and
active travel choices.
Improvements may consider: parking and road space
reallocation, traffic management arrangements,
connecting services, and placemaking to optimise
traffic flows and the space available, and improving
sustainable and active travel choices to reduce
congestion and local emissions.
Sustainable
Transport
Medium Medium Sustrans,
Tactran,
Transport Scotland
PKC

Page 89

Mobility Strategy Action Plan
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 87
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
232 Support partners to improve the access for all at
public transport interchanges supporting Scotland’s
Accessible Travel Framework. With partners, deliver a
programme of interchange upgrades by focussing on
improved infrastructure design to, and within railway
stations, and improved information, signage and
wayfinding by upgrading the accessibility and quality
of passenger facilities at existing stations or, where
needed, construction of new facilities.
Accessibility
and Inclusivity
Medium High* Tactran,
Transport Scotland
Centre for Inclusive
Living,
Network Rail,
Tactran
ID Supporting Actions Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
24 Support partners to improve the accessibility of rail
services and step-free stations.
Accessibility
and Inclusivity
Medium Low* Transport Scotland Network Rail,
Rail operators
233 Support partners to conduct audits of rail interchange
accessibility and security, and deliver a programme of
improvements to enable increased use and modal shift.
Accessibility
and Inclusivity
Medium Medium* Network Rail,
Transport Scotland
Network Rail,
Tactran
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 90

A Perth and Kinross where everyone can live life well, free from poverty and inequalities
Mobility Strategy Action Plan
88
ID Strategic Action Theme Timescale Indicative
Cost
Potential External
Funding Sources for
PKC
Potential Partners
234 Work with rail companies to improve the experience
within train stations by providing free facilities such as
adequate seating, well maintained toilets, water refill
stations and fast Wi-Fi.
Sustainable
Transport
Short Medium* Network Rail,
Rail Operators,
Transport Scotland
Rail Operators,
Network Rail
* The total cost (for both PKC and partners) of implementing this action will likely be considerably higher than 
the indicative cost in this Action Plan which highlights the indicative costs to PKC alone.

Page 91

No embedded text on this page.

Page 92

Perth & Kinross Council
Mobility Strategy
Action Plan Methodology
Reference: 4.1 
V.4 | September 2024 
Job number  296403-00
Ove Arup & Partners Limited
4th Floor  10 George Street
Edinburgh  EH2 2PF
United Kingdom
arup.com

Page 93

4.1 | V.4 | August 2024 | Ove Arup & Partners Limited 
Document Verification 
Project title Mobility Strategy
Document title  Action Plan Methodology Note
Job number 296403-00
Document ref 4.1
File reference 4-05-06-Task 4-06 
Revision Date Filename 
V.1 14/03/24 Description V.1 
Prepared by Checked by Approved by
Name AM, HR DH MB   
V.2 28/03/24  Filename 
Description V.2 
Prepared by Checked by Approved by
Name AM, HR DH MB    
V.3 16/04/24 Filename   
Description V.3           
Prepared by Checked by Approved by  
Name AM/HR DH MB      
V.4 13/09/24 Filename   
Description V.4     
Prepared by Checked by Approved by  
Name LY/HR HR MB

Page 94

4.1 | V.4 | August 2024 | Ove Arup & Partners Limited 
Issue Document Verification with Document  ✓

Page 95

4.1 | V.4 | August 2024 | Ove Arup & Partners Limited 
Contents 
Background & Methodology Overview 1
1. Case for Change 2
2. Transport Planning Objectives 2
3. Developing the Long List of Actions 4
4. Developing the Final List of Actions 8
4.1 Appraisal against STAG Criteria 8
4.2 Appraisal against Established National, Regional and Local Policy Objectives 9
4.3 Appraisal against Feasibility, Affordability, and Public Acceptability 9
5. Draft Action Plan 14
5.1 Developing Themes 14
5.2 Timescales 15
6. Stakeholder and Public Consultation 17
7. Appraisal 18
7.1 Indicative Cost 18
7.2 Potential Funding Sources 19
7.3 Potential Partners 19
8. Delivery Plan 21 
Tables 
Table 1: Mobility Strategy TPOs 3
Table 2: Documents reviewed to inform and create a Long List of Actions 5
Table 3: STAG Seven-Point Assessment Scale 7
Table 4: STAG Sub-criteria 8
Table 5: Sifted out actions 9
Table 6: STPR2 Recommendations 14
Table 7: All Actions Delivery Timeline 15
Table 8: Strategic Actions Delivery Timeline 16
Table 9: Public consultation survey responses 17
Table 10: All Actions Delivery Timeline 18
Table 11: Cost categories for PKC Mobility Strategy Action Plan 18
Table 12: Potential funding sources for PKC for the delivery of the Mobility Strategy Action Plan 19
Table 13: Potential Partner Organisations for the delivery of PKC Mobility Strategy Action Plan 20 
Figures
Figure 1: Triple Access System 1
Figure 2: Process to Develop TPOs 3
Figure 3: NTS2 Sustainable Travel Hierarchy 4
Figure 4: NTS2 Sustainable Investment Hierarchy 4
Figure 5: NTS2 Priorities and Associated Outcomes 14

Page 96

4.1 | V.4 | August 2024 | Ove Arup & Partners Limited 
Figure 6: Draft Action Plan Themes 14

Page 97

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 1 
Background & Methodology Overview
Arup has been appointed by Perth and Kinross Council (PKC) to support on the delivery of Perth and
Kinross Council’s Mobility Strategy Action Plan. The overarching objective of the work is to produce an
Action Plan that will set out how PKC, alongside working partners, will deliver the emerging Mobility
Strategy, contributing towards the Council’s Corporate Plan1 vision for a Perth and Kinross where
everyone can live life well, free from poverty and inequality. 
The purpose of this document is to provide a summary of the methodology undertaken to develop the Action
Plan which will set out Perth and Kinross Council’s vision for managing and developing the transport
network over a period of 15 years.
The Action Plan has been developed and informed in line with Local Transport Strategy Draft Guidance2.
Following this guidance, two tools have been employed to ensure that the Action Plan is supported by a
robust approach to appraisal:
STAG
The Action Plan has been informed and developed in line with the Scottish Transport Appraisal Guidance3
(STAG). STAG represents best practice guidance for transport appraisals and follows a structure and
methodology that is consistent with the UK Government’s Green Book4.
The STAG methodology provides a robust framework to evaluate potential transport actions. STAG
assessments are objective-led and seek to appraise projects and options against defined criteria. For further
details on the appraisal criteria and methodology, see Section 4.1.
Triple Access Planning
In line with Local Transport Strategy Draft Guidance and
ensuring that people have access to their daily activities,
strategies should be framed more broadly to consider not only
transport, but other non-transport approaches as visualised in
the Triple Access System (Figure 1)5. 
The Action Plan has been developed using this approach
which considers actions relating to the transport system
(physical mobility) as well as the land-use system (spatial
proximity) and the telecommunications system (digital
connectivity) which together constitutes a Triple Access
System. 
1 Perth and Kinross Council, Corporate Plan 2022-2027, https://www.pkc.gov.uk/media/50702/Corporate-Plan-2022-2027/pdf/Corporate_Plan_2022-
27_Final.pdf?m=1671722823530 
2 Transport Scotland, Local Transport Strategy: Draft Guidance, 2023, https://www.transport.gov.scot/media/53067/lts-local-transport-strategy-
guidance-draft-for-stakeholder-review.pdf
3 Transport Scotland, Scottish Transport Appraisal Guidance, 2008
4 HM Treasury, The Green Book – Central Government Guidance on Appraisal and Evaluation, 2022,
https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1063330/Green_Book_2022.pdf 
5 https://www.tapforuncertainty.eu/ 
Figure 1: Triple Access System

Page 98

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 2 
Structure of this Document
The remainder of this document is structured into the following chapters in line with methodology and steps
taken to develop the Action Plan in line with guidance. 
1. Case for Change
The Let’s Talk Transport Report6 carefully examines available data to identify problems and opportunities in
Perth and Kinross’s transport network, combining input from professional and civic stakeholders. Integrating
feedback from consultation undertaken with evidence from the report gives a full picture of the existing
transport network. This understanding forms the basis for the Council's Case for Change, justifying the need
for improvements. Establishing a Case for Change is the first stage in STAG guidance which promotes a
problem-led and evidence-based approach. More detail around consultation undertaken to inform the
Mobility Strategy can be found in the Mobility Strategy Report in Chapters 1&2. The problems and
opportunities identified in the Main Issues Report were used to partly inform the long list of actions
described in Section 3.
2. Transport Planning Objectives
After identifying strategic problems and opportunities, PKC formulated objectives to tackle these local
issues. All of the actions in the Action Plan have been appraised against the Transport Planning Objectives
(TPOs) as detailed in Section 3 .
Transport Planning Objectives (TPOs) have been developed in accordance with Transport Scotland’s
National Transport Strategy 27 (NTS2) and Tactran’s Regional Transport Strategy8 (RTS). Each objective
has undergone a detailed development process, commencing with the four NTS2 priorities and
corresponding RTS Objectives. This alignment is then integrated with PKC’s Corporate Plan Priorities and
the locally identified problems from the Let’s Talk Transport Report. This evidence-led process to develop
the TPOs is illustrated in Figure 2 below. 
6 Perth & Kinross Council. The Big Place Conversation – Let’s Talk Transport: Main Issues Report (2023).
https://consult.pkc.gov.uk/communities/lets-talk-transport/user_uploads/lets-talk-transport---main-issues-report-2.pdf 
7 Transport Scotland. National Transport Strategy 2. 2020. https://www.transport.gov.scot/media/47052/national-transport-strategy.pdf 
8 Tactran, Tayside and Central Scotland Regional Transport Strategy 2024-2034, Draft for Consultation, 2023, 2023-08-03-Draft-RTS-v6.pdf
(tactran.gov.uk)

Page 99

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 3 
11 TPOs have been developed to address key problems, creating specific, targeted and unique objectives for
PKC as shown in Table 1 below. The TPOs were developed by PKC in collaboration with Arup and refined
through an iterative process until the final wording was agreed.
Table 1: Mobility Strategy TPOs 
Figure 2: Process to Develop TPOs

Page 100

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 4 
3. Developing the Long List of Actions
PKC developed an initial list of actions in the form of a Baseline Action Plan comprising of 61 actions. This
initial list was informed by the identified problems and opportunities evidence base from engagement and
aligned with the TPOs. Arup then undertook a thorough desktop study to supplement and expand this initial
list to create a long list aligning with the Option Generation and Development Stage of STAG. To inform the
long list approximately 60 documents (see Table 2 overleaf) were reviewed, consisting of plans, strategies
and policies at varying scales:
• National – such as NTS2, Strategic Transport Projects Review 29 (STPR2), National Planning
Framework 410
• Regional – such as RTS, Regional EV (Electric Vehicle) Strategy11
• Local – such as Perth Transport Futures12, Community Action Plans, Local Development Plan13
• PKC Officer input (including details on existing operations and procedures)
• Elected Member input
• Arup expertise / publications
Any identified problem or opportunity sourced from these documents was added to the long list. As
mentioned in the above introduction, the Triple Access Planning approach was adopted when developing the
long list to ensure that as well as transport, other non-transport approaches were considered.  This included
digital and spatial which together constitute a Triple Access System. Identifying options in this way can
avoid a singular focus on transport infrastructure options. 
An additional consideration when developing the long list of actions in the Action Plan is both the
Sustainable Travel Hierarchy and the Sustainable Investment Hierarchy included in NTS2. NTS2 states that
transport options focusing on reducing inequalities and the need to travel unsustainably will be prioritised. 
Figure 3: NTS2 Sustainable Travel Hierarchy  Figure 4: NTS2 Sustainable Investment Hierarchy
At the end of the Option Generation, the long list of actions of the Draft Action Plan totalled 231 actions. 
9 Transport Scotland, Strategic Transport Projects Review 2, 2022, https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-
review-2/ 
10 Scottish Government, National Planning Framework 4, 2023, https://www.gov.scot/binaries/content/documents/govscot/publications/strategy-
plan/2023/02/national-planning-framework-4/documents/national-planning-framework-4-revised-draft/national-planning-framework-4-revised-
draft/govscot%3Adocument/national-planning-framework-4.pdf 
11 Tactran, Regional EV Strategy, 2019, https://tactran.gov.uk/wp-content/uploads/2021/12/Tactran-Regional-EV-Strategy_FINAL.pdf
12 Perth Transport Futures | Major Infrastructure Upgrade Programme
13 Perth and Kinross Council, Local Development Plan 2, 2019, LDP_2_2019_Adopted_Interactive.pdf (pkc.gov.uk)

Page 101

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 5 
Table 2: Documents reviewed to inform and create a Long List of Actions
Type Document/Site Name Author/Owner
National
policy/ 
strategy/ 
plan
Just Transition Plan Discussion Paper - Transport Scottish Government
Just Transition Plan Discussion Paper - Land Use &
Agriculture
Scottish Government
Just Transition Plan Discussion Paper - Built Environment &
Construction
Scottish Government
Programme for Government 2023 to 2024 Scottish Government
National Planning Framework 4 Scottish Government
Update to the Climate Change Plan 2018 to 2032 Scottish Government
Cleaner Air for Scotland 2 Scottish Government
Public Health Priorities for Scotland Scottish Government
Fairer Scotland Action Plan Scottish Government
National Transport Strategy 2 Transport Scotland
National Transport Strategy 2: Second Delivery Plan Transport Scotland
Strategic Transport Projects Review 2 Transport Scotland
Strategic Transport Projects Review 2: Tay Cities Region Transport Scotland
Scotland Cycling Framework Transport Scotland
Scotland’s Road Safety Framework to 2030 Transport Scotland
Public Health Scotland Delivery Plan 2021 to 2024 Public Health Scotland
Regional
policy/ 
strategy/ 
plan
Regional Transport Strategy 2015 to 2036 Refresh Tactran
Regional EV Strategy Tactran
Tayside Bus Partnership Fund Appraisal Study Systra
The Tay Cities Deal Taycities (Angus Council, Dundee
City Council, Fife Council, Perth and
Kinross Council)
TAYplan - Strategic Development Plan The Strategic Development Planning
Authority for Dundee, Angus, Perth
and North Fife
Local
policy/ 
strategy/ 
plan
Perth People Place Perth and Kinross Council
Perth and Kinross Active Travel Strategy Perth and Kinross Council
Perth and Kinross Local Development Plan 2 Perth and Kinross Council
Baseline Strategic Action Plan Perth and Kinross Council
Let's Talk Transport: Main Issues Report Perth and Kinross Council
Perth and Kinross Local Housing Strategy 2022 to 2027 Perth and Kinross Council
Perth Air Quality Action Plan Perth and Kinross Council
Crieff Air Quality Action Plan Perth and Kinross Council
Perth and Kinross council Corporate Plan 2022 to 2027 Perth and Kinross Council
Perth Transport Futures Perth Transport Futures
Perth Cycle Network Masterplan Systra
Cairngorms Local Development Plan 2021 Cairngorms National Park Authority
Cairngorms National Park Partnership Plan 2022 to 2027 Cairngorms National Park Authority

Page 102

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 6 
Climate Change Strategy and Action Plan Climate Action Perth and Kinross
(Perth and Kinross Council)
Flood Risk Management Plan – Tay Local Plan District SEPA
Perth and Kinross Community Plan (Local Outcomes
Improvement Plan 2022-2032)
Perth and Kinross Community
Planning Partnership
Strategy for the Alyth Development Trust Alyth Development Trust
Auchterarder and Aberuthven Community Action Plan 2022 to
2027
Auchterarder and Aberuthven
Community Action Plan Steering
Group
Blairgowrie and Rattray Community Action Plan 2021 to 2026 Blairgowrie and Rattray Community
Action Plan Steering Group
Crieff Community Action Plan 2021 to 2026 Crieff Community Action Plan
Steering Group
Delivering Rannoch’s Sustainable Future: Development Plan
Summary
Rannoch Community Fund Group
Mount Blair Community Action Plan 2013 to 2018 Mount Blair Community Action Plan
Steering Group
Pitlochry Community Action Plan Pitlochry Community Action Trust
St Fillans Community Action Plan 2017 to 2022 The Community Partnership in Loch
Lomond & The Trossachs National
Park Area
Stanley Community Action Plan 2010 to 2015 Stanley Community Futures
Arup
publication
Active Train Stations Arup
Equitable Future Mobility Arup & Urban Transport Group
Cities Alive: Designing cities that work for women Arup & University of Liverpool
Cities Alive: Towards a walking world Arup
Cities Alive: Rethinking green infrastructure Arup
Cities Alive: Designing for urban childhoods Arup
Cities Alive: Designing for ageing communities Arup
Cycling for everyone Arup & Sustrans
Walking for everyone Arup & Livings Streets & Sustrans
Inclusive cycling in cities and towns Arup & Sustrans
Intelligent Connectivity for Seamless Urban Mobility Arup & Qualcomm
Rethinking Urban Mobility Arup & London Transport Museum &
Gowling WLG & Thales
In line with the Early Option Sifting stage in STAG, each action in the long list was qualitatively appraised
against the 11 Transport Planning Objectives using a seven-point assessment scale in line with STAG
guidance. The assessment considered the relative size and scale of impacts. For each action, each TPO was
assigned a score of -3 to 3 in line with the Table 3 below. Actions which were not deemed to contribute
positively to the TPOs were sifted out.

Page 103

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 7 
Table 3: STAG Seven-Point Assessment Scale
Seven-point assessment scale 
Assigned
score in
Mobility
Strategy
Score  Definition   
Major benefit 
✓✓✓ 
These are benefits or positive impacts which, depending on the scale of benefit or
severity of impact, the practitioner feels should be a principal consideration when
assessing an option’s eligibility for funding 
3
Moderate benefit 
✓✓ 
The option is anticipated to have only a moderate benefit or positive impact.
Moderate benefits and impacts are those which taken in isolation may not
determine an option’s eligibility for funding, but taken together do so 
2
Minor benefit 
✓ 
The option is anticipated to have only a small benefit or positive impact. Small
benefits or impacts are those which are worth noting, but the practitioner believes
are not likely to contribute materially to determining whether an option is funded
or otherwise 
1
No benefit or impact 
- 
The option is anticipated to have no or negligible benefit or negative impact  0
Minor cost or
negative impact 
✗ 
The option is anticipated to have only a moderate cost or negative impact.
Moderate costs/negative impacts are those which taken in isolation may not
determine an option’s eligibility for funding, but taken together could do so 
-1
Moderate cost or
negative impact 
✗✗ 
The option is anticipated to have only a moderate cost or negative impact.
Moderate costs/negative impacts are those which taken in isolation may not
determine an option’s eligibility for funding, but taken together could do so 
-2
Major cost or
negative impact 
✗✗✗ 
These are costs or negative impacts which, depending on the scale of cost or
severity of impact, the practitioner should take into consideration when assessing
an option’s eligibility for funding 
-3
Following this step, the remaining actions in the long list were defined further, following the Option
Generation and Development Stage of STAG.  This was part of an iterative process with PKC.

Page 104

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 8 
4. Developing the Final List of Actions
In order to develop a final list, the long list of actions was subject to a Preliminary Options Appraisal in line
with STAG. Each action was qualitatively appraised against:
• STAG Criteria;
• Established National, Regional and Local Policy Objectives; and 
• Feasibility, Affordability, and Public Acceptability.
4.1 Appraisal against STAG Criteria
A qualitative assessment was completed against the STAG Criteria using a seven-point scale (see Table 3).
Each action was appraised against the five main STAG Criteria as per the updated STAG Managers Guide
202214, as well as a number of sub-criteria, as shown in Table 4:
• Environment;
• Climate Change;
• Health, Safety and Wellbeing;
• Economy; and
• Equality and Accessibility.  
Table 4: STAG Sub-criteria
Environment  Economy
• Biodiversity and Habitats  • Transport Economic Efficiency (TEE)
• Geology and Soils  • Wider Economic Impacts (WEIs)
• Land Use (including Agriculture and Forestry)  Equality and Accessibility
• Water, Drainage and Flooding  • Public Transport Network Coverage
• Air Quality  • Active Travel Network Coverage
• Historic Environment  • Comparative Access by People Group
• Landscape  • Comparative Access by Geographic Location
• Noise and Vibration  • Affordability
Climate Change 
• Greenhouse Gas Emissions  
• Vulnerability to the Effects of Climate Change  
• Potential to Adapt to the Effects of Climate Change  
Health, Safety and Wellbeing  
• Accidents  
• Security  
• Health Outcomes  
• Access to Health and Wellbeing Infrastructure  
• Visual Amenity   
14 Transport Scotland, Scottish Transport Appraisal Guidance – Managers Guide, 2022, www.transport.gov.scot/media/50895/scottish-transport-
appraisal-guidance-managers-guide.pdf

Page 105

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 9 
4.2 Appraisal against Established National, Regional and Local Policy
Objectives
As previously stated, the Mobility Strategy is designed to align with and complement various national,
regional and local strategies and policies. Each action was appraised against several key objectives,
priorities, and targets which the Mobility Strategy will support the delivery of. A full comprehensive list of
national, regional and local strategies and policies can be found in the Let’s Talk Transport Report.
The performance of each action against these policies and strategies was qualitatively assessed and assigned
a score using a seven-point scale (see Table 3).
4.3 Appraisal against Feasibility, Affordability, and Public Acceptability
Alongside the STAG Criteria and Established Policy, the implementation potential of the actions was
appraised in terms of feasibility, affordability, and public acceptability:
• Feasibility - the feasibility of construction or implementation and operation (if relevant) of an option
and the status of its technology (e.g. proven, prototype, in development, etc.) as well as any cost,
timescale or deliverability risks associated with the construction or operation of the option, including
consideration of the need for any departure from design standards that may be required;
• Affordability - the scale of the financing burden on the promoting authority and other possible
funding organisations and the risks associated with these. The level of risk associated with an
option’s ongoing operating or maintenance costs and its likely operating revenues (if applicable);
and
• Public Acceptability - the likely public response is of importance at this initial appraisal phase and
reference to supporting evidence, for example results from a consultation exercise should be
provided where appropriate.
For this part of the appraisal, the performance of each action has been qualitatively appraised over three
levels: Minor, Moderate or Major considerations. By ‘consideration’ it is meant that there may be potential
negative or problematic issues which will require a certain level of investigation.
As this analysis highlights ‘potential’ issues only, the scorings of ‘major considerations’ have not necessarily
led to an outright rejection of an action. The scoring has been considered in the overall context of the
appraisal and further analysis of ‘major’ issues should be explored if the action is taken forward.  As a result
of the Preliminary Options Appraisal, 67 actions in total were sifted out from the long list, having not
contributed to one or multiple of the above appraisal criteria. In addition, actions were also sifted out if they
had been consolidated into another action to address overlaps and repetition (see Table 5).
At the end of the Preliminary Options Appraisal, the final list totalled 164 actions . 
Table 5: Sifted out actions
ID Description Rationale for sifting out
9 Support partners working on Bridge of Earn/Oudenard sustainable
transport improvements. The improvement options that have been
submitted to Transport Scotland include appraisal work, for
instance, a mobility hub, railway station and improved bus
services.
Feedback provided post Mobility Board
meeting on 22 March 2024
15 Support the delivery of Perth & Kinross Countryside Trusts rural
active travel projects
Covered under ID199 in Final List
16 Support partners in the delivery of Cairngorms 2030, particularly
focused on active travel links within and between Blair Atholl and
Killiecrankie
Covered under ID112 in Final List
20 Encourage, support, and promote Community Transport Services
to complement and support existing services
Covered under ID43 in Final List

Page 106

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 10 
23 Support consideration for an improved rail corridor between
Dunfermline and Perth in the Strategic Transport Projects Review
2 - Edinburgh/Glasgow Perth/Dundee Rail Corridor Enhancements
Covered under ID117 in Final List
29 Regularly use Reclaimed Asphalt Pavement (RAP) and MacRebur
(binder extenders from 100% waste non-recyclable plastics)
Covered under ID31 in Final List
30 Encourage the use of Durakerb, a recycled & recyclable
lightweight kerb solution
Covered under ID31 in Final List
51 Develop a platform that allows for all upcoming work to be
mapped across the responsible teams, in order to collaborate and
align work streams. This will help find co-working opportunities,
optimize spend and minimise disturbance to the existing live road
network
Covered under ID28 in Final List
65 Support partners to improve public transport services in rural
areas, ensuring adequate connectivity with employment, schools
and services
Covered under ID67, ID81 and ID213 in
Final List
66 Deliver well defined key corridors connecting Perth with rural
neighbourhoods
Not well defined and covered under ID
68 and ID72 in Final List
69 Improve reliability of public transport and journey times Covered under ID67, ID81 and ID213 in
Final List
70 Provide further freight driver resting zones Covered under ID38 in Final List
74 Reduce road accident casualties and achieve or better national
road safety targets by mounting a regional road safety campaign
Covered under ID125 in Final List
77 Develop walking & cycling links to and within Perth city centre /
rural areas to employment, health facilitates, services, leisure and
tourism activities
Covered under ID72 in Final List
79 Support the provision of improved walking, wheeling and cycling
access at public transport interchanges and on trains/buses
Covered under ID19 and ID22 in Final
List
82 Identify and prioritise opportunities for enhanced provision of
CCTV on vehicles and at key interchanges and corridors to
increase perception of safety and encourage modal shift
Covered under ID41 in Final List
83 Identify and prioritise a programme of improvements and set
appropriate standards for lighting provision at bus stops and
interchanges as well as along active travel routes to increase
perception of safety and encourage modal shift
Covered under ID41 in Final List
87 Monitor car parking near long distance bus and coach stops in
order to facilitate rural interchange by providing small formal car
parks next to bus stops where provision can be supported
Does not align with policy objectives
90 Provide information that allows for planning and comparing
journey options, including sustainable/active travel options, along
with guidance on reliability
Covered under ID89 in Final List
95 Introduce a Bike Hire Scheme with electric bikes to help residents
or visitors overcome steeper inclines
Covered under ID44 in Final List
104 Improve accessibility for residents, visitors and businesses through
improvements to the transport network
Sifted out at an early stage in appraisal as
not well identified, too high-level and
covered off in other actions
105 Provide an inclusive transport system which improves
affordability and accessibility of public transport
Sifted out at an early stage in appraisal as
not well identified, too high-level and
covered off in other actions

Page 107

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 11 
106 Enhance choice and access to active travel and public transport Sifted out at an early stage in appraisal as
not well identified, too high-level and
covered off in other actions
108 Engage with disabled people and organisations that represent them
to agree priorities that will support improved door-to-door
journeys and identify barriers to travel
Covered under ID93 in Final List
109 Continue to develop and implement bus priority measures under
the Bus Partnership Fund to deliver bus priority on local roads
Covered under ID84 in Final List
112 Create new and/or improved active travel routes to connect
smaller rural communities with nearby towns by using high-
quality active travel infrastructure that segregates users from busy
roads but makes use of quiet roads where appropriate
Covered under ID72 in Final List
113 Create new and/or improved active travel routes to connect PKC
area with other regions,  cities and  major gateways, using high
quality active travel infrastructure that segregates users from busy
roads, but makes use of quiet roads where appropriate
Covered under ID17 in Final List
114 Build on existing programmes to deliver local, regional and
national initiatives that provide encouragement, enablement and
incentivisation for more people to make use of active and
sustainable choices, such as walking, wheeling, cycling, public
transport, shared mobility and Mobility-as-a-Service (MaaS)
Covered under ID144 in Final List
122 Monitor and evaluate the impact of active travel investment and
levels of cycling to embed learning in future decisions and
schemes
Covered under ID92 in Final List
126 Install speed indicators in areas of high deprivation to help
mitigate higher than average crash casualties
Covered under ID103 in Final List
127 Develop an Open Space Strategy to develop scaled-up and nature-
based solutions to enhance and increase open spaces, that are well
managed, located and connected
Covered under ID128 in Final List
129 Continue to encourage, promote and facilitate the application of
the Place Principle and create connected and compact
neighbourhoods where people can meet the majority of their  daily
needs within a reasonable distance of  their home, preferably by
walking, wheeling or  cycling or using sustainable transport
options
Covered under ID111 in Final List
132 Encourage, promote and facilitate the roll out of digital
infrastructure across PKC to unlock the potential of all our places
and the economy by ensuring that the technology is universal,
future-proofed and delivered universally, particularly in areas with
no or low connectivity capacity
Covered under ID37 in Final List
135 Allow free parking for EVs in council-run car parks or on-street
parking bays
Does not align with policy objectives
136 Ensure EV charging tariffs align with other Councils in the
Tactran region and contribute to the national coordination of EV
charging tariffs
Does not align with policy objectives
144 Invest in the further development of Urban Traffic Control, Real
Time Passenger Information, bus priority measures, travel apps,
active travel and a Mobility as a Service (MaaS) pilot across the
Tay Cities area.
Covered under ID2, ID55 and ID84 in
Final List
145 Explore feasibility of further Park & Choose facilities Covered under ID173 in Final List

Page 108

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 12 
155 Ensure Transport Statements or Assessments are required for new
developments to show that development proposals will not have
an unacceptable adverse impact on existing transport infrastructure
or services, and to determine whether any new transport
infrastructure is required as a result of development
This is a planning process that should
already be adhered to
157 Manage public greenspace and transport networks for biodiversity
enhancement and habitat connectivity
Does not contribute positively enough to
the TPOs
160 Improve public transport accessibility and network in rural areas
by developing a hub and spokes model, where one central hub
location caters for lots of smaller spokes for smaller outlying
settlements and key visitor destinations
Covered under ID8 in Final List
162 Ensure new developments that involve significant travel
generation are well served by and easily accessible to all modes of
transport to reduce travel demand by car, and ensure a realistic
choice of access and travel modes is available
Covered under ID49 in Final List
165 Ensure the design of streets considers the experiences of women
who are more likely than men to have low incomes, be in insecure
work and live in poverty, as well as being more likely than men to
walk, be a passenger in a car or take a bus, and make multistop
and multi-purpose trips
Covered under ID219 in Final List
167 Investigate the efficiency and optimisation of traffic management
controls to optimise traffic flows to reduce congestion and local
emissions
Covered under ID2 in Final List
170 Improve safety of all road users along trunk road network, such as
the A9, by exploring options of dualling and provision of grade
separated junctions
Covered under ID220, ID221 and ID222
in Final List
171 Provide accessible year-round toilet facilities in town centres Covered under ID219 in Final List
174 Improve safety for people walking, wheeling and cycling across
the trunk road network, such as A9 - potential to upgrade future
grade separated junctions
Covered under ID220, ID221 and ID222
in Final List
175 Create public transport guides for residents / visitors across PKC
that cover bus, rail and express coach services and ensure they are
promoted widely
Covered under ID89 in Final List
178 Improve road signage and lay-bys to include information/picnic
facilities, particularly in rural areas
Does not align with policy objectives
183 Ensure there is sufficient parking infrastructure at popular visitor
attractions
Does not align with policy objectives
191 Implement improvements to parking enforcement Covered under ID36 in Final List 
192 Work with partners to implement EV buses and charging
infrastructure
Covered under ID56 in Final List
193 Introduce cycling skill training for vulnerable groups Covered under ID76 in Final List
194 Conduct audits of bus stop ancillary infrastructure across PKC.
Carry out improvements based on findings
Covered under ID26 in Final List
197 Work with partners to develop a Green Health Prescribing
Programme for Perth & Kinross
Covered under ID169 in Final List
198 Explore feasibility to pedestrianise town centres to create a
physical focus and boost local economy
Covered under ID181 in Final List

Page 109

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 13 
200 Improve bus services frequency in evenings and weekends to
encourage use of public transport
Covered under ID182 in Final List
202 Increase the accessibility of buses by accommodating wheelchairs,
prams, cycles and persons with disabilities
Covered under ID124 in Final List
203 Re-purpose disused railway lines for active travel paths Covered under ID203 in Final List
208 Remove barriers to existing cycle infrastructure and ensure new
infrastructure ensures inclusive design standards for the elderly/
people with accessibility issues
Covered under ID219 in Final List
211 Reallocate road space/parking spaces for temporary or permanent
public realm such as parklets
Covered under ID190 in Final List
212 Reallocate redundant spaces to pedestrians / urban realm Covered under ID190 in Final List
214 Address impacts on freight and public transport operations through
direct improvements/additional capacity at Broxden
Covered under ID74, ID220, ID221 and
ID222 in Final List
Reworded post PKC officer feedback
215 Implement by-passes for the villages/towns along A977. Then
Implement widening of pavements and shared-use facilities
Covered under ID121 in Final List and
scored negatively agasint two TPOS
216 Work with bus operators to ensure reliability, frequency, routes,
operating hours, affordability of bus services
Covered under ID67, ID81 and ID213 in
Final List
217 Develop a protected route for a railway line linking Fife and
Kinross, including the reintroduction of rail to the north of
Kinross,  and incorporate in both PKC LDP and the Fife LDP
Sifted out based on PKC officer feedback
218 Explore the feasibility of expanding extent and capacity of
existing park and ride sites such as Kinross
Covered under ID7 in Final List

Page 110

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 14 
5. Draft Action Plan
5.1 Developing Themes
The final list of actions were allocated into themes. Grouping similar actions from the final list makes the list
of actions not only more digestible, but it will also help the next stage of the appraisal process.
The themes align with the six STPR2 recommendations and four NTS2 priorities as shown below in Table 6
and Figure 5 respectively. 
Table 6: STPR2 Recommendations 
Each of the 164 actions in the Draft Action Plan have been grouped into 8 broad themes shown in Figure 6
below. The themes of all actions in the final Action Plan are shown in Section 5. of the final Action Plan
document (Appendix 2). 
Figure 6: Draft Action Plan Themes 
STPR2 recommendations: 
Figure 5: NTS2 Priorities and Associated Outcomes
• Improving active travel infrastructure
• Influencing travel choices and
behaviour
• Enhancing access to affordable public
transport
• Decarbonising transport
• Increasing safety and resilience on
the strategic transport network
• Strengthening strategic connections

Page 111

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 15 
Each action has been grouped into one of 8 themes that best reflects what the action relates to, depending on
mode or type of action. 
Each of the actions could potentially be allocated under numerous themes as
there are inevitable interdependencies in the final list of actions. Therefore, it
is possible that Strategic and Supporting Actions are not within the same
theme. 
The list of actions in the Action Plan have also been broken down between
Strategic Actions and Supporting Actions: 
a. Strategic Actions are those deemed significant and impactful in
achieving the TPOs.
b. Supporting Actions consist of granular actions intended to assist
and support the delivery of the Strategic Actions. 
In the Draft Action Plan, 45 actions have been identified as Strategic Actions
and the remaining 120 actions have been allocated as Supporting Actions. 
5.2 Timescales
Given the scope and magnitude of the Action Plan, actions will be developed and implemented over a 15-
year timeframe. Some actions will require business case development and are dependent on external funding,
while others can be executed in the short term. 
During the Preliminary Options Appraisal of all actions in line with STAG, the feasibility of actions was
considered (as detailed in Section 4.3 above). To consider actions in more detail, feasibility was broken
down into three sub criteria of technology, timescale, and deliverability. Each of these three sub criteria were
assessed against each action in the final list. Timescale was scored in line with the seven-point scale (see
Table 3) in order produce an indicative timeline for the Draft Action Plan at this stage.
An indicative delivery timeline overview of all 164 actions per theme are shown in Table 7 below.
Timescales have been estimated on the assumption that all actions have funding secured and are ready to be
delivered. 
An indicative delivery timeline overview of all 45 Strategic Actions per theme are shown in Table 8 below.
Again, timescales have been estimated on the assumption that all actions have funding secured and are ready
to be delivered. 
Table 7: All Actions Delivery Timeline

Page 112

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 16 
Table 8: Strategic Actions Delivery Timeline

Page 113

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 17 
6. Stakeholder and Public Consultation
The Draft Perth and Kinross Council Mobility Strategy Draft Action Plan was presented to the Climate
Change and Sustainability Committee on 1 May 2024. 
After the Committee approval, PKC undertook a stakeholder and public consultation exercise seeking
feedback on the Draft Policy Document and Action Plan in the summer of 2024 (28 May – 28 July). The
public consultation questionnaire covered questions in relation to the Mobility Strategy, Transport Planning
Objectives and Action Plan. During the consultation period, the Mobility Strategy gained 72 responses. The
responses, shown in Table 9, from the consultation survey show general support for the key aims and
planning objectives of the draft Policy Document and Action Plan as well as the actions put forward. 
Table 9: Public consultation survey responses 
While the structure of the Action Plan remains largely unchanged, feedback from stakeholders and public
consultations have led to amendments made to actions in the final Action Plan. These changes include: 
- Rewording actions
o Minor rewording of 87 actions, with 20 of them based on public consultation responses.
- Splitting actions into new strategic actions
o Total number of actions: 167 (164) → 3 new actions
o Strategic actions: 47 (44) → 3 new actions
o Supporting actions: 120 (120) → no change
- Changing themes of actions
o Total of 5 actions have been re-themed (+3 new actions)

Page 114

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 18 
- Changing strategic-supporting action pairings
o Total of 3 actions have changed the action they are supporting (+3 new actions)
Subsequently, the final Action Plan includes 167 actions. An indicative delivery timeline overview of all 167
actions per theme are shown in Table 10 below. Timescales have been estimated on the assumption that all
actions have funding secured and are ready to be delivered
Table 10: All Actions Delivery Timeline 
7. Appraisal
After the public consultation period, further work was undertaken on the final list of actions. This involved a
more detailed consideration of the actions, including identification of indicative costs, potential funding
sources and partners.
7.1 Indicative Cost
The costs allocated to the implementation of the Action Plan have been considered as the costs for PKC to
carry out their part in the action implementation. However, it is recognised that in some instances, the total
cost (cost for both PKC and partners) of implementing this action will likely be considerably higher than the
indicative cost mentioned in the Action Plan. 
The cost categories and their descriptions are shown in Table 11.
Table 11: Cost categories for PKC Mobility Strategy Action Plan
Indicative Cost Description
Low Small-scale infrastructure costs or transport studies/plans.
Medium Infrastructure costs that are deliverable within existing budgets such as CWSR.
High Major projects needing significant capital investment and external funding.
Very High Major multi-year projects / programmes needing significant capital investment and external
funding, potentially from multiple sources.

Page 115

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 19 
7.2 Potential Funding Sources
A list of potential funding sources are shown in Table 12. Each action within the Action Plan may have a
number of potential funding sources. 
Dependent on the cost and scope of the action, funding source can also be identified as “PKC Only” meaning
that PKC would likely bear the full cost of implementing the action. 
The list of potential funding sources provides an indication at the time of preparation of this Action Plan. It
should not be viewed as a comprehensive list or as a commitment from external parties.
Table 12: Potential funding sources for PKC for the delivery of the Mobility Strategy Action Plan
# Potential external Funding Sources for PKC
1 Broadband Providers
2 Bus Operators
3 Cairngorms National Park Authority
4 Car Club Operators
5 Cycling Scotland
6 Energy Saving Trust
7 Funding sources to be explored
8 Greenspace Scotland
9 Innovate UK
10 Loch Lomond & The Trossachs National Park
11 National Centre for Resilience
12 NHS Tayside
13 Paths for All
14 PKC Only
15 Private Developer Contributions
16 Logistics Operators
17 Scottish Environment Protection Agency (SEPA) 
18 Scottish Futures Trust
19 Scottish Government
20 Sustrans
21 Tactran
22 Tay Cities Region Deal
23 Transport Scotland
7.3 Potential Partners
Potential partners, are shown in Table 13. Dependent on the scope of the action, several partners can be
assigned to each action. When the delivery of the action can be implemented by PKC without partners, the
partner has been identified as “PKC”. The list of potential partners provides an indication at the time of
preparation of this Action Plan. It should not be viewed as a comprehensive list or as a commitment from
external parties.

Page 116

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 20 
Table 13: Potential Partner Organisations for the delivery of PKC Mobility Strategy Action Plan
Type # Potential external Funding Sources for PKC
National 1 BEAR Scotland
2 Broadband Providers
3 Car Club Operators
4 ChargePlace Scotland
5 Community Transport Association
6 CoMo UK
7 Cycle Sharing Scheme Operators
8 Cycling Scotland
9 Demand Responsive Transport Providers
10 Energy Providers
11 Energy Saving Trust
12 Federation of Small Businesses Scotland
13 Greenspace Scotland
14 Live Active Leisure
15 NatureScot
16 Network Rail
17 Organisations delivering behaviour change initiatives
18 Paths for All
19 Police Scotland
20 Rail Operators
21 Scottish Environment Protection Agency (SEPA) 
22 Scottish Forestry
23 Scottish Futures Trust
24 Scottish Government
25 Scottish Water
26 Taxi and Private Hire Fleet Operators
27 Transport Scotland
28 Travel Know How Scotland
29 Woodland Trust
Regional 30 Cairngorms National Park Authority
31 HITRANS
32 Loch Lomond & The Trossachs National Park
33 Nestrans
34 NHS Tayside
35 SEStran
36 Sustrans
37 Tactran
38 Tactran Freight Quality Partnership

Page 117

Perth & Kinross Council Mobility Strategy 
4.1 | V.4 | September 2024 | Ove Arup & Partners Limited Action Plan Methodology Page 21 
39 Tactran Liftshare
40 Tactran Regional EV Steering Group
41 Tay Cities Region
42 Tayside Local Resilience Partnership
Local 43 Bus Operators
44 Business Owners
45 Centre for Inclusive Living
46 Community Councils
47 Community Development Trusts
48 Community Organisations
49 Community Transport Groups
50 Parent Councils
51 Perth and Kinross Countryside Trust
52 Perth and Kinross Health and Social Care Partnership
53 Private Developers
54 Private Land Managers
55 Private Parking Providers
56 Schools
57 Social Housing Providers
58 Workplaces
59 Road Operating Companies
60 PKC
8. Delivery Plan
The final Delivery Plan sets out a bank of actions for delivery over the lifespan of the Mobility Strategy and
brings together the work done in previous steps. A range of funding sources will be required to support
the delivery of the Action Plan. Therefore, the Delivery Plan also provides indicative scales of cost and
identifies potential funding sources for the delivery of the actions. 
Not all actions within the Action Plan are solely within the remit of PKC and therefore successful delivery of
the actions will involve a number of existing and new partnerships. Regardless, each of the actions has been
worded in a way that enables for a team at PKC to progress the action implementation. In most cases, the
action lead for each strategic action and its supporting actions will be one team. However, it may also be
possible that a number of teams will need to deliver the actions in collaboration. The identification of the
appropriate action leads will be carried out by PKC after the delivery of the final Mobility Strategy and
Action Plan.
The 47 strategic actions with their supporting actions can be seen in Section 5 of the final Action Plan
(Appendix 2).