PERTH AND KINROSS COUNCIL 
Climate Change and Sustainability Committee 
23 October 2024 
MOBILITY STRATEGY 
Report by Strategic Lead - Economy, Development & Planning
(Report No. 24/289) 
1. PURPOSE 
1.1 The purpose of the report is to seek approval for the Consultation Draft
Mobility Strategy and associated Draft Action Plan.   
2. RECOMMENDATIONS
2.1   It is recommended that the Committee: 
• Approve the Mobility Strategy (Appendix 1) and the associated Action
Plan (Appendix 2).
• Note the supporting documentation (Consultation Note, Strategic
Environmental Assessment (SEA), and Integrated Impact Assessment
(IIA). 
3. STRUCTURE OF REPORT 
3.1  This report is structured over the following sections: 
• Section 4 – Background
• Section 5 – Context
• Section 6 – Mobility Strategy  
• Section 7 – Action Plan
• Section 8 – Co-ordination with City Centre Visioning
• Section 9 – Engagement and Consultation
• Section 10 – Conclusion  
• Appendices 
4. BACKGROUND 
4.1 Perth & Kinross Council’s Corporate Plan 2022-27 (Report No. 22/311 refers)
includes a list of local, regional and national strategies and plans which set out
the context for how we deliver the priorities contained in the Corporate Plan. A
Mobility Strategy has been identified as a key strategy in delivering two
Corporate Plan priorities: tackling climate change and supporting sustainable
places; and developing a resilient, stronger and greener local economy.

Page 2

4.2 The Mobility Strategy is one of three place-based strategies which shape how
places develop over the long-term: the others being the Local Housing
Strategy and the Local Development Plan. All three strategies aim to deliver
the Council's Corporate Plan vision of a Perth and Kinross where everyone
can live life well free from poverty and inequalities. The three place-based
strategies are visualised in Figure 1, along with their corresponding national
strategies. 
4.3 In addition, of specific relevance is the Council’s Climate Change Strategy and
Action Plan (December 2021) which identified six overarching principles that
will shape our long-term approach to Climate Change. The first principle
focuses on achieving a net zero Perth and Kinross, aligned with Scottish
Government targets. This identified the need to develop a Mobility Strategy to
deliver the best return on investment in the Council’s journey to net zero. 
4.4 The National Transport Strategy 2 (February 2020) sets out an ambitious
vision for Scotland’s transport system for the next 20 years. The vision is
underpinned by four priorities: Reduces Inequalities, Takes Climate Action,
Helps Deliver Inclusive Economic Growth and Improves our Health and
Wellbeing. It is proposed that Perth & Kinross Council’s Mobility Strategy
adopts these key priorities, ensuring they are fundamental to the development
and delivery of the strategy. The Strategy’s Transport Planning Objectives
(TPOs) are also aligned with Tactran’s ministerial approved Regional
Transport Strategy (RTS) and the Council’s Corporate Plan Priorities. 
Figure 1 - Place based strategies

Page 3

Figure 2 – Alignment of Objectives 
4.5 Each objective has undergone a detailed development process and forms  the
basis for creating an organisational framework to inform decision-making, 
planning, and strategic leadership. The TPO’s are shown in Table 1 below: 
Table 1 – Transport Planning Objectives

Page 4

5. CONTEXT 
5.1 The Mobility Strategy is a local transport strategy which will set out Perth &
Kinross Council’s vision for managing and developing the transport and active
travel network over a 15-year timescale. The Mobility Strategy considers all
modes of transport for the movement of people and goods across Perth and
Kinross’s rural and urban settings, to help achieve national targets and local
objectives. The Strategy will respond to the climate change agenda and other
known drivers of change. 
5.2 The Mobility Strategy considers the impact on transport networks and
people’s travel patterns of emerging technologies, digital services, housing,
inclusion, poverty, health, climate adaptation, economic growth, air quality,
and place making. 
5.3 A simple three-stage approach was used to produce the Mobility Strategy. 
Stage 1 – Let’s Talk Transport – (Approved March 2023)
Stage 2 – Develop Consultation Draft Mobility Strategy – (Approved May 2024)
Stage 3 – Finalising the Mobility Strategy – (Adoption) 
6. MOBILITY STRATEGY
6.1 The Mobility Strategy (Appendix 1) marks the final step in the Council's
planned three-stage approach. This follows on from an 8-week consultation,
allowing for diverse stakeholders to share their thoughts on the documents. 
6.2 The Mobility Strategy (Appendix 1) is structured as follows:
Figure 3 – Mobility Strategy Sections

Page 5

6.3 Throughout the development process, insights from Let’s Talk Transport have
been important in informing the policy document combining analysed data and
perspectives gathered through the documents’ consultation. This has ensured
that the Mobility Strategy is robust, relevant, and adaptable to the diverse
needs and dynamics of Perth & Kinross. 
7. MOBILITY STRATEGY ACTION PLAN 
7.1 The Mobility Strategy Action Plan (Appendix 2) will enable the Council to plan,
programme, and deliver actions to achieve the Mobility Strategy’s Transport
Planning Objectives. Aligned with the Avoid Shift Improve (ASI) Framework
outlined in the Mobility Strategy (Appendix 1 - page 23), this plan aims to
enhance, facilitate, and promote sustainable transport and active travel
choices. 
7.2 A strategic appraisal of actions has been conducted, utilising Transport
Planning Objectives and various criteria including implementation, public
perception, environmental impacts, and more. The key themes of the action
plan, used to organise strategic actions, are shown in Table 2 below: 
Table 2 – Action Plan Themes

Page 6

7.3 Given its scope and magnitude, the Action Plan will be developed and
implemented over a 15-year timescale. Some actions will require robust
business case development and will be dependent on external funding, while
others can be executed in the short term. The timeline for each action
depends on its progress, size, scale, and the required resources. Identifying
such actions early in the planning process ensures strategic alignment,
accelerates development and delivery, mitigates risks, and encourages
external funding. 
8. CO-ORDINATION WITH PERTH CITY CENTRE DEVELOPMENT &
DESIGN FRAMEWORK 
8.1 The Mobility Strategy covers all of Perth and Kinross and has been developed
alongside the Perth City Centre Development & Design Framework that has
been recently approved for consultation (report 24/241 refers). 
8.2 The Mobility Strategy and Action Plan will both support and enable many of
the ambitious proposals across Perth City.  
9. ENGAGEMENT & CONSULTATION
9.1 The engagement and consultation on the Mobility Strategy and associated
Action Plan has dovetailed with the Local Development Plan focused Big
Place Conversation, ensuring mobility was not considered in isolation from
wider place-based issues.   
Figure 3 – Engagement and Consultation 
9.2 Following consideration by Committee, the Draft Mobility Strategy and Action
Plan underwent 8 weeks of public consultation using the Council’s
Consultation Hub platform. Officers conducted 6 in-person promotional stalls
across Perth and Kinross, along with using a variety of promotional tools both
physical and digital.

Page 7

9.3  The findings from the consultation have been summarised in the Consultation
Findings Report (Appendix 3), which also explores proposed changes to the
documents following feedback from the consultations. The recent draft
Mobility Strategy consultation exercises led to changes to the action plan in
response to participant feedback. 
10. NEXT STEPS 
10.1 Following approval of the Mobility Strategy and its Action Plan, officers will
work with internal delivery teams to allocate actions to the appropriate teams
and individuals, ensuring action leads are identified and monitored throughout
the strategy’s timeline. 
10.2 The information provided within the Action Plan on timescales, partners, and
costs, will enable action leads to prioritise and determine what is required for
successful development and delivery. 
10.3 This will align with the emerging Monitoring and Evaluation Plan to track
progress, identify constraints, and address any foreseeable issues which will
be reported on at appropriate intervals. 
11. CONCLUSION 
11.1 Following consultation on the draft Mobility Strategy Policy Document and
Action Plan, the collated feedback has been used to finalise the Mobility
Strategy. General endorsement was received showing support for the Mobility
Strategy, the 11 TPOs, and the Action Plan, in preparation for its adoption. 
Authors 
Name  Designation Contact Details 
Elliot Williamson 
Niall Moran 
Lead Mobility
Strategy Officer,
Planning, Transport &
Housing Strategy 
Team Leader,
Transportation &
Development 
(01738) 475000
EPLCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
David Littlejohn  Strategic Lead -
Economy, Development &
Planning 
9 October 2024

Page 8

APPENDICES 
• Appendix 1 – Mobility Strategy 
• Appendix 2 – Mobility Strategy Action Plan and Methodology
• Appendix 3 – Consultation Note

Page 9

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  No
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27: 
(i) Reducing Poverty (including child poverty, fuel poverty and food 
poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the new Corporate Plan: - 
i) Children and young people grow up safe, respected, well-educated, and
confident in their ability to realise their full potential; 
ii) People and businesses are increasingly able to prosper in a local economy
which support low carbon ambitions and offers opportunities  for all; 
iii) People can achieve their best physical and mental health and have  access to
quality care and support when they need it; 
iv) Communities are resilient and physically, digital and socially connected;

Page 10

v) Perth and Kinross is a safe and vibrant place, mitigating the impact of climate
and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report. Infrastructure
actions from the Mobility Strategy Action Plan will be appropriately
incorporated into the Council’s 30-year Investment Plan. 
2.2 The finalised Mobility Strategy and associated Action Plan will also be used
as a key tool in supporting and securing external funding opportunities. 
Workforce 
2.3 There are no direct workforce implications regarding this report. Project staff
resourcing is being provided through existing posts and budgets and will be
regularly reviewed. 
Asset Management (land, property, IT) 
2.4 There are no direct asset management implications regarding this report. 
3. Assessments 
3.1 The Mobility Strategy has considered appropriate impact assessments using
the Council’s new Integrated Assessment Toolkit. 
3.2 A full Strategic Environmental Assessment (SEA) has been finalised and
reviewed by the Scottish Government consultation authorities via the SEA
Gateway. 
3.3 An Integrated Impact Assessment is finalised and adopts a similar approach
to Tactran’s Regional Transport Strategy. 
Legal and Governance 
3.4 There are no direct legal implications in this report. 
Risk 
3.5 Risks associated with the delivery of the Mobility Strategy are identified within
a project risk register.

Page 11

4. Consultation 
External 
4.1 Figure 3 visualises the different exercises used to engage with stakeholders 
throughout the development of the Mobility Strategy. 
Internal 
4.2 Internal engagement between council officers played a key role in developing
the strategy, this collaboration is governed through the Council’s Mobility
Working Group. 
5. Communication 
5.1 A Communication Plan was developed and delivered.   
2. BACKGROUND PAPERS 
2.1  All documents that have been relied on in preparing the report are already
referenced within the main body of the report.