Democracy Spraffa

Appendix A - Public Bodies Climate Change Duty Report 2023-24 Submission

Perth and Kinross Council · 23 October 2024
Back to Climate Change and Sustainability Committee — 23 October 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Public Bodies Climate Change Duties Compliance Reporting Financial Year Template 2023/24
1. Overview
This template is provided for public bodies required to report annually in accordance with the Climate Change (Duties of Public Bodies Reporting
Requirements) (Scotland) Order 2015, as amended by the Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland)
Amendment Order 2020 which took effect for reporting periods commencing on or after 1 April 2021.
Reports must be submitted to ccreporting@ed.ac.uk by 30th November. Late submissions will not be accepted for analysis and may be deemed
non-compliant with Public Bodies Duties reporting requirements.
2. Guidance
1. Please do not delete any cells, rows or columns. This may corrupt the template/data and compromise analysis. You can hide any extra rows
within tables.
2. Please complete the new "Boundary info" tab. This will enable improved assessment of data coverage and inform SSN analysis.
3. The "Profile of Body" tab must be completed before proceeding to add any other data. 
4. To ensure that the correct emission factors are applied please ensure that you are using the correct template for the reporting year type under
Q1f. If your organsiation reports according to the academic year, usually August to July, you must use the Academic Year template. 
5. If you need to add more rows in any table please email the file to ccreporting@ed.ac.uk
6. In Q3b emissions sources can be filtered by type in Column C. The list of available factors is visble on the Emission Factors tab. Please do not edit this list, use "other" if an EF is not available.
7. Only use the "other" rows when there is no relevant emission source available in the dropdown list or if you have bespoke data/emission factors. Please provide a brief explanation in the comment.
8. Water supply and treatment (sewage) emission factors are based on Scottish Water's carbon intensities for service supply. If you wish to use UK factors you need to enter manually in an "Other" row.
9. More detailed guidance is available on the SSN website
3. Colour Coding used in the template
Dropdown box - select from list of options
Uneditable/fixed entry cell
Editable cell

Page 2

Public Bodies Climate Change Duties Compliance Reporting Template 2023/24 FY
Please answer all questions below with respect to the public body's reporting boundary for the reporting period.
The information is intended to improve data coverage and inform analysis, in particular, to help identify data gaps. 
There are 3 possible responses:
YES - where data is available and is reported
NA - where a category is relevant but no data is available
NO - the category is not relevant
Any points of clarification can be added in the comments field for the corresponding emission source(s) in Table 3b on the Emissions tab.
Category
Select from
dropdown list
Owned estate  Are any buildings owned by the PB? Yes
Managed sevices  Are building services managed on behalf of another public body that shares or leases space? Yes
Leased premises  Are building services managed and provided by another public body?   No
Streetlighting  Are streetlights owned or operated? NA
Fleet and equipment  Are any vehicles or fossil-fueled machinery or equipment owned or leased, excludes short-term or infrequent hires? YES
Refrigerants/F-gases  Are there any air conditioning or refrigeration systems that require refrigerant gas top-ups? NA
Medical gases  Are medical gases used? No
Business travel - private  Do staff undertake business travel using private cars? Yes
Business travel - flights  Do staff undertake any business travel by plane?  NA
Homeworking  Do staff work from home - including hybrid?  Yes
Supply chain  Are any goods or services purchased? NA
Land use   Are more than 10 hectares of land owned or managed for public services provision, including for research or recreation?  NA
Waste services  Is the public body responsible for collecting household or municipal waste? Yes

Page 3

PART 1 Profile of Reporting Body
1a Name of reporting body
Provide the name of the listed body (the "body") which prepared this report.
Perth and Kinross Council
1b Type of body
Select from the options below
Local Government
1c Highest number of full-time equivalent staff in the body during the report year
5111.33
1d Metrics used by the body
Metric Units Value Comments
Population size served population 150953 Census 2022
Floor area m2 5286000000.00 This is the land area of the Council rather than the area of Council buildings
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Other (please specify in comments) 
Other (please specify in comments) 
Other (please specify in comments) 
Other (please specify in comments) 
Other (please specify in comments) 
Other (please specify in comments)
15 Other (please specify in comments)
1e Overall budget of the body
Specify approximate £/annum for the report year.
Budget Budget Comments
£450,525,000 Revenue
1f Report type
Check the report year type is correct. The alternative template must be used for academic year reporting.
Reporting type Report year comments
Financial/Calendar/Other Financial year 2023/24
1g Context
Public Sector Report on Compliance with Climate Change Duties 2024 Template FY
Specify the metrics that the body uses to assess its performance in relation to climate change and sustainability.
Provide a summary of the body's nature and functions that are relevant to climate change reporting.
In addition to the Council's own offices, the Council's own emissions result from its ownership, operation and maintenance of a large number of public buildings including schools and libraries along with its vehicle fleet,
waste and water, and street lighting. The Council also has a wider influence through directing, supporting and enabling climate change related action in the wider local authority area; directly  through involvement with
social housing, transport planning, waste collection and development planning and control; and indirectly through programmes to raise awareness and influence behaviour, and through strategic partnerships in the wider
region.

Page 4

PART 2 Governance, Management and Strategy
Governance and management
2a
2b
Strategy
2c
Provide a brief summary of objectives if they exist.
Wording of objective
Creating a safe and sustainable place for future generations.We will use our own organisations and influences to address climate change, tackle pollution, make sustainable energy choices, reduce and recycle waste and promote sustainable transport options, such as cycling and walking to support people’s health and wellbeing.By 2018/19 there will be:- Future risks and opportunities for partners and our communities of predicted climate change scenarios and impacts identified, and action taken to adapt accordingly. Future risks and opportunities for partners and our communities identified in relation to the sustainable use of resources. The total domestic energy consumption in the Perth and Kinross area (kWh) will have reduced. By 2020/21 there will be:- Further contributions locally to the Scottis                             
Tackling Climate Change and Promoting Sustainable Places
2d
2e
Provide the name of any such document and the timeframe covered.
Topic area Name of document Link Time period covered Comments
Adaptation Perth and Kinross Local Development Plan LDP2, The Perth & Kinross Council Climate Change Strategy and Action Planhttps://www.pkc.gov.uk/media/45242/Adopted-Local-Development-Plan-2019-/pdf/LDP_2_2019_Adopted_Interactive.pdf?m=637122639435770000  https://www.pkclimateaction.co.uk/climate-change-strategy2019-2029, 2021 onwards
Business travel TACTRAN Regional Transport Strategy Refreshhttps://www.tactran.gov.uk/documents/RTSRefresh-FinalReport.pdf2015-2036 5.4.2 TRAVEL PLAN GUIDANCE AND SUPPORT The strategy seeks the development and co-ordination of workplace travel plans across the region.TP1 Maintain close working relationships with the ScottishGovernment, other RTPs, local authorities, travel organisations, business organisations and stakeholders to share best practice and establish a seamless approach to implementing and coordinating effective Travel Plans.TP2 Provide support and advice to establish effective Travel Plans throughout the public sector.TP3 Encourage the development of private sector Travel Plans with major employers.TP4 Pro                                             
Staff Travel TACTRAN Regional Transport Strategy Refreshhttps://www.tactran.gov.uk/documents/RTSRefresh-FinalReport.pdf2015-2036 6.4 - Climate Change DutiesTactran has undertaken work on producing a Transport Carbon Assessment which identifies the baseline position for both the Tactran and TAYplan regions and their constituent authority areas. This work identified key priority mitigation areas where the Partnership and its RTS have significant potential to contribute to or support reduction in transport carbon emissions:  • supporting low carbon vehicles and infrastructure;• promoting eco-driving training and advice;• Travel Planning;• supporting road-based public transport infrastructure and services improvements• support                 
Energy efficiency Perth and Kinross Local Housing Strategy https://www.pkc.gov.uk/article/15102/Local-Housing-Strategy 2022-27 Deliver quality homes with affordable warmth, zero emissions and SMART technology - Improving the quality and energy efficiency of all types of homes, tackling fuel poverty through investment in properties, and setting a road map for reducing domestic carbon emissions.
Fleet transport Perth and Kinross Council Fleet Usage Policyhttps://www.pkc.gov.uk/media/50200/Fleet-Usage-Policy/pdf/Perth_and_Kinross_Council_Fleet_Usage_Policy_March_2022_002.pdf?m=638001523524000000PKC is working towards delivering the Scottish
ICT Digital Perth and Kinross 2023-27 https://www.pkc.gov.uk/article/23352/Digital-Strategy-Becoming-digital-Perth-and-Kinross#:~:text=Digital%20Perth%20and%20Kinross%202023%2D2027&text=It's%20a%20world%20in%20which,%2C%20place%2C%20economy%20and%20government.&text=Being%20connected%20and%20increasing%20digital,becoming%20Digital%20Perth%20and%20Kinross.2023-27 Connecting digitally/working smarter to reduce energy consumption
Renewable energy Perth and Kinross Local Development https://www.pkc.gov.uk/media/45242/Adopted-Local- 2019-29 Policy 33: Renewable and Low-Carbon Energy . Policy 32: Embedding Low and Zero Carbon Generating Technology in New Development Proposals
Sustainable/renewable heat Perth and Kinross Local Development https://www.pkc.gov.uk/media/45242/Adopted-Local- 2019-29 Policy 34: Sustainable Heating and Cooling) of the Local Development Plan (2019) notes that the Council will prepare Supplementary Guidance to assist in the consideration of planning applications and sustainable heating/cooling taking in to account a range of factors.
Waste management Perth and Kinross Waste Management Planhttps://www.pkc.gov.uk/media/1278/Perth-and-Kinross-Waste-Management-Plan/pdf/Perth_and_Kinross_Waste_Management_Plan.pdf?m=6360989513842700002010-2025 The Perth & Kinross Council Waste Management Plan
Water and sewerage Perth and Kinross Local Development Plan LDP2https://www.pkc.gov.uk/media/45242/Adopted-Local-Development-Plan-2019-/pdf/LDP_2_2019_Adopted_Interactive.pdf?m=6371226394357700002019-2029 Policy 51: Water Environment and Drainage.
Land Use Perth and Kinross Local Development Plan LDP2https://www.pkc.gov.uk/media/45242/Adopted-Local-Development-Plan-2019/pdf/LDP_2_2019_Adopted_Interactive.pdf?m=6371226394357700002019-2029 Policy 14: Open Space Retention and Provision. Policy 33: Renewable and Low Carbon Energy. Policy 38: Environment and Conservations. Policy 40: Forestry, Woodland and Trees
Other (please specify in comments)
Other (please specify in comments) Local Flood Risk Management Plans (LFRMP)https://www.pkc.gov.uk/frmplans 2022-2028 Flooding and Flood Risk Policy 50: New Development and Flooding.Within the parameters as defined by this policy the Council supports the delivery of the actions and objectives to avoid an overall increase, reduce overall, and manage flood risk as set out within the relevant SEPA Flood Risk Management Strategies and the Local Flood Risk Management Plans.
Other (please specify in comments) EV Infrastructure Strategy https://perth-and-kinross.cmis.uk.com/perth-and-kinross/Meetings/tabid/70/ctl/ViewMeetingPublic/mid/397/Meeting/3467/Committee/136/Default.aspxEV Infrastructure Item 4 - Appendices 1 and 2. PKC want
Other (please specify in comments)
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
2f What are the body’s top 5 priorities for climate change governance, management and strategy for the year ahead?
Provide a brief summary of the body’s areas and activities of focus for the year ahead.
Provide a summary of the roles performed by the body’s governance bodies and members in relation to climate change. If any of the body’s activities in relation to climate change sit outside its own
governance arrangements (in relation to, for example, land use, adaptation, transport, business travel, waste, information and communication technology, procurement or behaviour change), identify
these activities and the governance arrangements. Provide a diagram / chart to outline the governance structure within the body.
Perth and Kinross Council declared their support for action to address the climate emergency through a motion in June 2019, outlining a plan of action to mitigate and adapt to the effects of
Climate Change. The Interim Climate Emergency Report and Action Plan was approved by Perth and Kinross Council in December 2019 with a view to establishing a baseline from which the Council
can engage with national and local elected representatives, partners, communities and citizens. The planned extensive public engagement on the draft plan was planned for early 2020,  however
was delayed due to the Covid-19 pandemic and took place from October 2020 through to January 2021. Following this, a finalised Climate Change Report and Action Plan was approved by the
Council in December 2021.
Day to day governance of many issues  concerning climate change are primarily through the Climate Change and Sustainability Committee. The Committee considers matters relating to: climate
change, sustainability of the natural environment, biodiversity, and environmental well-being. The Committee monitors and oversees progress in relation to the Council's Climate Change Action
Plan, while it also provides guidance to the relevant Committees in relation to:  Environmental Protection and Enhancement, Countryside Management, Parks and Open Spaces,  Trees and
Woodlands,  Flood Prevention and Waste Management.
How is climate change action managed and embedded in the body?
Provide a summary of how decision-making in relation to climate change action by the body is managed and how responsibility is allocated to the body’s senior staff, departmental heads etc. If any
such decision-making sits outside the body’s own governance arrangements (in relation to, for example, land use, adaptation, transport, business travel, waste, information and communication
technology, procurement or behaviour change), identify how this is managed and how responsibility is allocated outside the body. Provide a diagram to show how responsibility is allocated to the
body’s senior staff, departmental heads etc.
The Depute Chief Executive  leads on Climate Change within the Council and act as the Executive Sponsor of the Climate Change and Sustainability Group.  Co-ordination and progress reporting of
the Council's commitments under the Climate Change (Scotland) Act 2009 is part of the remit of the Climate Change and Zero Waste Team based in Environment & Infrastructure.The Climate
Change and Sustainability Group (previously named Low Carbon Working Group) consisting of representatives from the relevant housing and environment teams allows for co-ordinated sharing of
best practice across the services. The Group is divided into thematic subgroups (Energy & Buildings, Transport, Climate Resilience, Waste & Circular Economy, Education & Engagement, Governance,
Business & Industry, and Land use).
The corporate committee report template includes requirement for Sustainability and Climate Change and Strategic Environmental Assessment (SEA) to be considered as part of the committee
reporting process. The sustainability assessment section also reflects the Council’s duty under the Climate Change (Scotland) Act 2009. The template also requires use of the council's Integrated
Public Sector Report on Compliance with Climate Change Duties 2024 Template FY
How is climate change governed in the body?
Corporate Plan 2022/23 to 2027/28 https://www.pkc.gov.uk/article/23060/Corporate-Plan-Priority-Tackling-climate-change-and-supporting-sustainable-places
Does the body have specific climate change mitigation and adaptation objectives in its corporate plan or similar document?
Name of document Document Link
Perth and Kinross Community Plan (Local Outcomes Improvement Plan) 2017-2027, 'Creating a safe and sustainable place for future generations' - 5. Building a Sustainable Future, page 42http://www.pkc.gov.uk/media/40553/Community-Plan-Local-Outcomes-Improvement-Plan-2017-2027/pdf/LOIP_online.pdf?m=636567189070430000
Perth and Kinross Council Climate Change Strategy and Action Plan available at https://www.pkclimateaction.co.uk/climate-change-strategy
Does the body have any plans or strategies covering the following areas that include climate change?
Does the body have a climate change plan or strategy?
If yes, provide the name of any such document and details of where a copy of the document may be obtained or accessed.

Page 5

2g
If yes, please provide details of the key findings and resultant action taken.
(a) This refers to the tool developed by Resource Efficient Scotland for self-assessing an organisation’s capability / performance in relation to climate change.
Further information
2h Supporting information and best practice
The Council has a a cross-organisational Climate Change and Sustainability Group that is responsible for overall progress and delivery of climate action.
The Council has worked with Community leaders to establish an independent Climate Change Commission (that includes 25% young people) to provide scrutiny over Council's climate progress
1.Connue to mainstream climate change into commiee procedures and council operaons, including through the rollout of embedding the Impact and Value Assessment Tool in commiee
reporting;
2.Connue rollout of carbon literacy training to all council employees with a targeted focus on elected officials and key decision makers;
3.Develop an acon plan for our Scope 3 carbon footprint
4.Connue to build capacity of procurement and contract management staff around ensuring climate change is appropriately considered in procurement and delivery processes, including in
category strategies for high emission categories
5.Support the Perth & Kinross Climate Commission to relaunch and rebrand
Has the body used the Climate Change Assessment Tool (a) or equivalent tool to self-assess its capability / performance?
The CCAT completed for Perth & Kinross Council in July 2024 gave an overall score of 71%, an increase of 2% on the previous year. There was overall progress in line with Council targets. Two of the
five sub-topics showed progress, with Climate Governance showing the biggest improvement moving up from 89% to 93%.  This increase is attributed to the inclusion of Climate Change as a
strategic priority in the new Corporate Plan, increased organisational accountability and the implementation of the Impact and Value Assessment Tool which was introduced in 2023. Progress was
also identified in the Adaptation sub-topic that covers questions related to  climate risks and opportunities as a result of climate hazards – utilising the results of the Climate Risk and Opportunity
Assessment for Perth and Kinross that was finalised in Spring 2023.
Procurement has remained the lowest scoring sub-topic at 38% - the need to improve climate considerations in procurement is an identified aim of the ongoing procurement transformation
programme.
Provide any other relevant supporting information and any examples of best practice by the body in relation to governance, management and strategy.

Page 6

No embedded text on this page.

Page 7

PART 3 Corporate Emissions, Targets and Project Data
Emissions
3a Emissions from the start of the year which the body uses as a baseline (for its carbon footprint) to the end of the report year
Reference year Year Year type Scope 1 Scope 2 Scope 3 Total Units Comments
Baseline Year 2015/16 Financial/Calendar/Other 9,033 14,676 14,995 38,704.60 tCO2e
Baseline has been amended to provide
consistency in trend data. Diesel was
removed to avoid double counting with
emissions calculated by transport mileage. 
2015/16 baseline to reflect this. Figures may
differ from previous years' submission due
to a recalculation after coding emissions
under the correct scope to allow accuracy in
data.
3 Year 1 carbon footprint 2016/17 Financial/Calendar/Other 8,339 12,661 18,859 39,859.00 tCO2e
Figures  differ from previous years'
submission due to a recalculation after
coding emissions under the correct scope to
allow accuracy in data.
4 Year 2 carbon footprint 2017/18 Financial/Calendar/Other 8,593 9,967 19,153 37,713.00 tCO2e
Figures  differ from previous years'
submission due to a recalculation after
coding emissions under the correct scope to
allow accuracy in data.
5 Year 3 carbon footprint 2018/19 Financial/Calendar/Other 10,180 5,314 20,488 35,981.70 tCO2e
Includes fleet and business travel data for
the first time. Scope 2 emission total has
been updated from 2018/19 report to
account for multiple sources as in previous
years. Scope 1 total is lower than previous
years due to lower gas figure as 2018 was a
mild winter, introduced fixed temperatures
and heating seasons, and extended the use
of BMS and half hourly (HH). Figures may
differ from previous years' submission due
to a recalculation after coding emissions
under the correct scope to allow accuracy in
data.
6 Year 4 carbon footprint 2019/20 Financial/Calendar/Other 10,722 6,823 19,560 37,104.50 tCO2e
Scope 1 total increased in 2019/20 due to
colder weather and biomass boilers being
offline for works and repairs, so gas
increased as used as back up for heating.
This also explains why there was  reduced
biomass consumption. Kerosene 2019/20
increased as during refurbishment works
two schools were converted from Gas Oil to
kerosene (cheaper and less polluting fuel).
Figures may differ from previous years'
submission due to a recalculation after
coding emissions under the correct scope to
allow accuracy in data.
7 Year 5 carbon footprint 2020/21 Financial/Calendar/Other 10,163 5,106 19,337 34,605.20 tCO2e
Scope 1 emissions increased due to some
vehicle emissions transferrring from being
erroneously coded as Scope 3 and Out of
Scope to Scpe 1 this year.
With this removal from Scope 3, the Scope 3
emissions stayed relatvely flat due to the
addition of homeworking emissions.  Figures
may differ from previous years' submission
due to a recalculation after coding
emissions under the correct scope to allow
accuracy in data.
8 Year 6 carbon footprint 2021/22 Financial/Calendar/Other 10,670 5,217 20,122 36,008.00 tCO2e
Scope 1 emissions increased from 2020/21
due to increased vehicle use across Councll
fleet. Transport emissions have still
decreased since 2019 which is the last
comparable year without the Covid-19
impacts.
Scope 2 and 3 emissions have remained
relatively flat in comparison to the previous
reporting year, however, some energy
emissions were erroneously coded as Scope
2 which partly justifies the increase in this
year's Scope 3 emissions.
9 Year 7 carbon footprint 2022/23 Financial/Calendar/Other 9,719.30 4,730.42 26,021.91 40,471.63 tCO2e
Scope 1 and 2 emissions decreased from
2021/22. Scope 3 emissions increased,
however, this is attributed to adding more
accurate data in relation to staff travel to
and from work as a result of a staff travel
and homeworking survey that was
conducted. This has been added on the
table below and as a result, 5368.92 tCO2e
have been added to this reporting year's
footprint. Without the inclusion of these
emissions, the total footprint would have
reduced when compared to last year's
figure, however, this would not provide an
accurate representation of the Council's
footprint.
10 Year 8 carbon footprint 2023/24 Financial/Calendar/Other 9,441.47 4,517.73 13,987.42 27,946.63 tCO2e
Perth and Kinross Council's footprint
decreased by approximately 31% compared
to 2022/23.  This significant reduction is
largely due to changes in waste processing,
with smaller reductions in emissions from
energy produced on site, business travel and
employee commuting.   In August 2023,
Perth and Kinross Council committed to a
long-term residual waste contract for
Energy from Waste (incineration) rather
than landfilling of residual waste.  While
only a partial year, this led to a dramatic
decrease in year-on-year emissions from
Landfill of 11,868 tCO2e (64.5%). In April
2023, the Council introduced a tarrif for
public EV (electric vehicle) charging. As a
result, emissions arising from public EV
charging are now reported under Scope 3, as
opposed to being included in the Council's
Scope 2 emissions in the previous years. 
The introduction of the tarrif also led to
decreased usage of EV chargers across the
local authority area, further contributing to
the reductions of emissions associated with
elecricity consumption (now Scope 3).
11 Year 9 carbon footprint 0 Financial/Calendar/Other - tCO2e
12 Year 10 carbon footprint 0 Financial/Calendar/Other - tCO2e
13 Year 11 carbon footprint 0 Financial/Calendar/Other - tCO2e
14 Year 12 carbon footprint 0 Financial/Calendar/Other - tCO2e
15 Year 13 carbon footprint 0 Financial/Calendar/Other - tCO2e
16 Year 14 carbon footprint 0 Financial/Calendar/Other - tCO2e
17 Year 15 carbon footprint 0 Financial/Calendar/Other - tCO2e
18 Year 16 carbon footprint 0 Financial/Calendar/Other - tCO2e
19 Year 17 carbon footprint 0 Financial/Calendar/Other - tCO2e
20 Year 18 carbon footprint 0 Financial/Calendar/Other - tCO2e
3b Breakdown of emissions sources Please refrain from deleting rows or columns anywhere in this template. This workbook is password protected to prevent this and should not be unlocked.
Emission Factor Year 2023
You can filter emission sources by "type" in column C to enable quicker selection of emission source in column D. See the list in the Emissions Tab.
User defined emission sources can be entered in rows 131 onwards. Please only use these if you cannot find a relevant emission source in the dropdown list or you have a bespoke emission factor or non-standard derivation of emissions e.g. based on a survey/consumption data. If you require extra rows in the table please send the template to ccreporting@ed.ac.uk.
Emission Type Emission source Scope Consumption data Units Emission factor Units Emissions (tCO2e) Comments
Waste Commercial and industrial waste - Landfill Scope 3 3,196 tonnes 520.33474 kg CO2e/tonnes 1662.98151
Waste Organic: food and drink waste - Anaerobic digestion Scope 3 1,120 tonnes 8.91242 kg CO2e/tonnes 9.98284
Waste Organic: garden waste - Composting Scope 3 19,020 tonnes 8.91242 kg CO2e/tonnes 169.51117
Waste Paper and board: mixed - Recycled Scope 3 6,554 tonnes 21.28081 kg CO2e/tonnes 139.47441
Waste WEEE - mixed - Combustion Scope 3 1,186 tonnes 21.28081 kg CO2e/tonnes 25.24053 This is for WEEE - Mixed - Recycled but it was not an option in the list. WEEE combustion has the same emission factor so reported the figures under that option as advised.
Waste Glass - Recycled Scope 3 3,880 tonnes 21.28081 kg CO2e/tonnes 82.56834
Waste Plastics: average plastics - Recycled Scope 3 1,366 tonnes 21.28081 kg CO2e/tonnes 29.06958
Waste Clothing - Recycled Scope 3 217                                                                                    tonnes 21.28081 kg CO2e/tonnes 4.60759
Waste Commercial and industrial waste - Combustion Scope 3 5,579 tonnes 21.28081 kg CO2e/tonnes 118.73556
Waste Wood - Recycled Scope 3 3,312 tonnes 21.28081 kg CO2e/tonnes 70.48510
Waste Household/Municipal/Domestic waste - Combustion Scope 3 19,599 tonnes 21.28081 kg CO2e/tonnes 417.07399
Waste Tyres - Recycled Scope 3 85                                                                                      tonnes 21.28081 kg CO2e/tonnes 1.81398
Waste Plasterboard - Recycled Scope 3 213                                                                                    tonnes 21.28081 kg CO2e/tonnes 4.53451
Waste Average construction - Recycled Scope 3 5,333 tonnes 0.98491 kg CO2e/tonnes 5.25236
Waste Mineral oil - Recycled Scope 3 20                                                                                      tonnes 21.28081 kg CO2e/tonnes 0.42742
Waste Metal: scrap metal - Recycled Scope 3 1,072 tonnes 21.28081 kg CO2e/tonnes 22.81303
Waste Metal: steel cans - Recycled Scope 3 352                                                                                    tonnes 21.28081 kg CO2e/tonnes 7.48297
Waste Metal: aluminium cans and foil (excl. forming) - Recycled Scope 3 271                                                                                    tonnes 21.28081 kg CO2e/tonnes 5.77370
Waste Household/Municipal/Domestic waste - Landfill Scope 3 9,756 tonnes 497.04471 kg CO2e/tonnes 4848.95642
Waste Books - Recycled Scope 3 48                                                                                      tonnes 21.07310 kg CO2e/tonnes 1.01198
Electricity Electricity: UK Scope 2 21,816,963 kWh 0.20707 kg CO2e/kWh 4517.73209 Includes unmeasured and corporate consumption
Electricity Transmission and distribution - Electricity: UK Scope 3 21,816,963 kWh 0.01792 kg CO2e/kWh 390.85332
Fuels Natural gas Scope 1 34,915,144 kWh 0.18293 kg CO2e/kWh 6386.98980
Fuels Gas oil Scope 1 1,529,014 kWh 0.25650 kg CO2e/kWh 392.18541
Public Sector Report on Compliance with Climate Change Duties 2024 Template FY
Complete the following table using the greenhouse gas emissions total for the body calculated on the same basis as for its annual carbon footprint / management reporting or, where applicable, its sustainability reporting. Include greenhouse gas
emissions from the body’s estate and operations (a) (measured and reported in accordance with Scopes 1 & 2 and, to the extent applicable, selected Scope 3 of the Greenhouse Gas Protocol (b). If data is not available for any year from the start of the
baseline year to the end of the report year, provide an explanation in the comments column.
(a) No information is required on the effect of the body on emissions which are not from its estate and operations.
(b) This refers to “The greenhouse gas protocol. A corporate accounting and reporting standard (revised edition)”, World Business Council for Sustainable Development, Geneva, Switzerland / World Resources Institute, Washington DC, USA (2004),
ISBN: 1-56973-568-9.
Complete the following table with the breakdown of emission sources from the body’s most recent carbon footprint (greenhouse gas inventory); this should correspond to the last entry in the table in 3(a) above. Use the ‘Comments’ column to explain what is included within each category of emission source entered in the first column. If there is no data
consumption available for an emission source enter the emissions in kgCO2e in the ‘Consumption’ column of one of the “Other” rows and assign the scope and an emission factor of 1.
SELECT APPROPRIATE BASELINE YEAR. TOTAL EMISSIONS IN THE MOST RECENT FOOTPRINT YEAR IN THIS QUESTION SHOULD EQUAL TOTAL EMISSIONS IN Q3B
(a) Emissions factors are published annually by the UK Department for Energy Security & Net Zero

Page 8

Fuels Burning oil (Kerosene) Scope 1 277,358 kWh 0.24677 kg CO2e/kWh 68.44453
Bioenergy Wood chips Scope 1 2,218,106 kWh 0.01074 kg CO2e/kWh 23.82246
Water Water supply Scope 3 146,641 cubic metres 0.10000 kg CO2e/cubic metres 14.66410
Water Water treatment Scope 3 134,042 cubic metres 0.19000 kg CO2e/cubic metres 25.46798
Transport - car Average car - Unknown Scope 3 1,386,571 miles 0.26817 kg CO2e/miles 371.83328 This is the total Grey Fleet miles claimed
Transport - car Small car - Hybrid Scope 1 920,643 miles 0.16336 kg CO2e/miles 150.39234 Fleet vehicles - mileage taken from tracker/FMS
Transport - car Small car - Diesel Scope 1 351,394 miles 0.22420 kg CO2e/miles 78.78101 Fleet vehicles - mileage taken from tracker/FMS
Transport - car Medium car - Diesel Scope 1 7,607 miles 0.26902 kg CO2e/miles 2.04640 Fleet vehicles - mileage taken from tracker/FMS
Transport - car Large car - Diesel Scope 1 7,628 miles 0.33570 kg CO2e/miles 2.56069 Fleet vehicles - mileage taken from tracker/FMS
Transport - car Small car - Petrol Scope 1 144,704 miles 0.22660 kg CO2e/miles 32.78949 Fleet vehicles - mileage taken from tracker/FMS
Transport - van/HGV Vans - Class II (1.305 to 1.74 tonnes) - Diesel Scope 1 171,541 miles 0.28013 kg CO2e/miles 48.05361 Fleet vehicles - mileage taken from tracker/FMS
Transport - van/HGV Vans - Class III (1.74 to 3.5 tonnes) - Diesel Scope 1 1,289,319 miles 0.40792 kg CO2e/miles 525.93770 Fleet vehicles - mileage taken from tracker/FMS
Transport - van/HGV HGV (all diesel) - All rigids - Average laden Scope 1 1,007,654 miles 1.32470 kg CO2e/miles 1334.84211 Fleet vehicles - mileage taken from tracker/FMS
Transport - van/HGV HGV (all diesel) - All artics - Average laden Scope 1 209,613 miles 1.45877 kg CO2e/miles 305.77745 Fleet vehicles - mileage taken from tracker/FMS
All Vans - Average (up to 3.5 tonnes) - Diesel Scope 1 238,704 miles 0.37224 kg CO2e/miles 88.85493 Fleet vehicles - mileage taken from tracker/FMS - this is our Fleet Minibuses (no option under transport)
Transport - car Small fleet car - Battery Electric Vehicle Scope 1 38,321 miles 0.00000 kg CO2e/miles 0.00000 Fleet vehicles - mileage taken from tracker/FMS
Transport - car Large fleet car - Battery Electric Vehicle Scope 1 69,901 miles 0.00000 kg CO2e/miles 0.00000 Fleet vehicles - mileage taken from tracker/FMS
Homeworking Homeworking (office equipment + heating) Scope 3 2072971 FTE Working Hour 0.33378 kg CO2e/FTE Working Hour 691.91876 estimated FTE working hour figure as a result of a staff travel and homeworking survey
Electricity Electricity: UK Scope 3 1,102,690 kWh 0.20707 kg CO2e/kWh 228.33875 emissions arising from EV public charging
Electricity Transmission and distribution - Electricity: UK Scope 3 1,102,690 kWh 0.01792 kg CO2e/kWh 19.75481
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Please select from drop down box Please select from drop down box Please select from drop down box 0.00000 Please state in comments if this value is 0 because no emissions exist or if emissions likely exist, but are unknown
Other Other (please specify in comments) Scope 3 - 0.0000000 4616.796378 estimated emissions arising from staff travel to/from work as a result of a staff travel and homeworking survey
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
Other Other (please specify in comments) Please select from drop down box -
121 27,946.634 #NAME?
3c Generation, consumption and export of renewable energy
Provide a summary of the body’s annual renewable generation (if any), and whether it is used or exported by the body.
Total consumed by the body (kWh) Total exported (kWh) Total consumed by the body (kWh) Total exported (kWh) Comments
Biomass - - 2,218,106 -
Air Source Heat Pump 160,222
Solar thermal 25,000
Solar PV 373,512
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Targets
3d Organisational targets
Name of target Type of target Target Units Boundary/scope of target Year used as baseline Baseline figure Units of baseline Target completion year
Progress against
target Comments
Net zero target Absolute net zero by 2045 total % reduction All emissions 2015/16 43,308 tCO2e 2045/46 Emissions have reduced since the baseline year, however,  we need to accelerate emissions reductions in the upcoming years in order to meet the 2045 net zero target.Baseline year 2015/16
Emissions arising from Council Estate (non-domestic properties)Absolute 68% reduction by 2030 compared to 2020 levels tCO2e reduction Energy use in buildings 2015/16 10,111 tCO2e 2030/31 Emissions have been steadily decreasing since the baseline year
Energy consumption reduction target for non-domestic Perth and Kinross Council portfolioPercentage 3% annual reduction for 2022/23 KWh reduction Energy use in buildings Please select from drop down box 57,939,867 kWh 2022/23 Emissions have been reducing, however, baseline is consumption for 2022/23 and we are therefore not abel to track progress against the baseline year.Baseline will be the projected consumption for 2022/23
Remove oil as fuel for heating and hot water in PKC estateAbsolute all sites with oil as heat to be removed by 2030 KWh reduction Energy use in buildings 2020/21 2,923,457 kWh 2030/31 Emissions have been reduced significantly.Baseline year 2021
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
3da
3db How will the body publish, or otherwise make available, it's progress towards achieving its emissions reduction targets?
Provide any other relevant supporting information. In the event that the body wishes to refer to information already publshed, provide information about where the publication can be accessed.
Simply referencing this report or it's availabilty on the SSN website is insufficient information.
Technology
Renewable Electricty Renewable Heat
List all of the body’s targets of relevance to its climate change duties. Where applicable, targets for reducing indirect emissions of greenhouse gases, overall carbon targets and any separate land use, energy efficiency, waste, water, information and
communication technology, transport, travel and heat targets should be included. Where applicable, you should also provide the body’s target date for achieving zero direct emissions of greenhouse gases, or such other targets that demonstrate how
the body is contributing to Scotland achieving its emissions reduction targets.
How will the body align its spending plans and use of resources to contribute to reducing emissions and delivering its emission reduction targets?
Provide any relevant supporting information that is not already included elsewhere in this report.
Climate change is becoming increasingly embedded within the Council’s financial planning.  There is an annual revenue budget of c. £500k linked directly to delivery of the acon plan.  Starng from the 2023/24 budget seng process, all proposals were screened on climate change implicaons and this has connued yearly

Page 9

Projects and changes
3e
Emissions source Total estimated annual carbon savings (tCO2e) Comments
Electricity 31
Natural gas 55
Other heating fuels 8                                                                                                                                                              Gas oil and Kerosene
Waste 11,420
Water and sewerage
Travel
Fleet transport
Other (please specify in comments)
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Total 11,514
3f
Project name Funding source First full year of CO2e savings Are these savings figures estimated or actual? Capital cost (£) Operational cost (£/annum) Project lifetime (years) Primary fuel/emission source saved
Estimated carbon savings per year
(tCO2e/annum)
Estimated costs
savings (£/annum) Behaviour Change Comments
Heating and Controls Upgrade - 2 High Street Revenue & Capital 2024/25 estimated £46k £45k 25 Please select from drop down box 23                                                                          £6k Yes
Hot Water rationislation - Alyth PS Borrowing 2024/25 estimated £27k £13k 25 Please select from drop down box 3                                                                            £1.5k No
BMS Upgrade - Arngask Borrowing 2024/25 estimated £26k £9k 25 Please select from drop down box 8                                                                            £2.3K Yes
Auchterarder PS - LED upgrade Borrowing 2024/25 estimated £69k 25 Please select from drop down box Please select from dropdown box
Blairgowrie HS - LED upgrade Borrowing 2024/25 estimated £30k 25 Please select from drop down box Please select from dropdown box
Auchterarder HS - LED upgrade Borrowing 2024/25 estimated £29k 25 Please select from drop down box Please select from dropdown box
Auchterarder HS - Energy Saving Projects Borrowing 2024/25 estimated £17k 25 Please select from drop down box Please select from dropdown box
AK Bell - New Boilers Borrowing 2024/25 estimated £50k 25 Please select from drop down box Please select from dropdown box
Residual Waste Contract Revenue 2024/25 actual £4.6m 10 (3+2) Please select from drop down box 11,400 Please select from dropdown box
project lifetime is 10 years with a potential expansion of 5 years (3+2)
as stated in the contract award. Carbon savings identified are actual
carbon savings for the first half year (2023/24 - project began in August
2023). These are expected to fluctuate for the duration of the contract
Twin Stream Capital, revenue & income 2024/25 estimated £2.25m 3 (1+1) Please select from drop down box 20 Please select from dropdown box
Project rolled out January 2024 - estimated carbon savings provided as
a result of improving recycling by reducing contamination rates and
diverting waste away from landfill. This project was funded mainly
through capital from RIF, however PKC did contribute to the initial
Communications for this also as a one off cost (£131k). Cardboard,
paper & container mix are anticipated to deliver an income, however
this is reliant on market conditions throughout the contracts, as there
has been expenditure & income with the container mix contract to
date. Both are 3 year contracts with the possibility to extend for 2
years (1+1).
Please select from drop down box Please select from drop down box Please select from drop down box Please select from dropdown box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from dropdown box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from dropdown box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from dropdown box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from dropdown box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from dropdown box
3g
Emissions source Total estimated annual emissions (tCO2e) Increase or decrease in emissions Comments
Estate changes Please select from drop down box
Service provision Please select from drop down box
Staff numbers Please select from drop down box
Other (please specify in comments) Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Total -
3h Anticipated annual carbon savings from all projects implemented by the body in the year ahead
Emissions source Total estimated annual carbon savings (tCO2e) Comments
Electricity -
Natural gas 40
Other heating fuels 10
Waste
Water and sewerage
Travel
Fleet Transport
Other (please specify in comments)
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Total 50
3i
Emissions source Total estimated annual emissions (tCO2e) Increase or decrease in emissions Comments
Estate changes 150 decrease 3% target year on year energy consumption decrease across the Council's estate portfolio
Service provision 5,000 decrease Energy from Waste Plant - diverting waste away from landfill
Staff numbers Please select from drop down box
Other (please specify in comments) 281 increase new Perth Museum will contribute to total energy increase
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Total 4,869-                                                                                        
3j
Total savings Total estimated emissions savings (tCO2e) Comments
Total project savings since baseline year Not enough valid data to comment
Further information
3k
If no projects are expected to be implemented against an emissions source, enter “0”.
If the organisation does not have any information for an emissions source, enter “Unknown”.
If the organisation does not include the emissions source in its carbon footprint, enter “N/A”.
Estimated total annual carbon savings from all projects implemented by the body in the report year
If no projects were implemented against an emissions source, enter "0".
If the body does not have any information for an emissions source, enter “Unknown”.
If the body does not include the emissions source in its carbon footprint, enter “N/A”.
Detail the top 10 carbon reduction projects to be carried out by the body in the report year
Provide details of the 10 projects which are estimated to achieve the highest carbon savings during report year.
Estimated decrease or increase in the body’s emissions attributed to factors (not reported elsewhere in this form) in the report year
If the emissions increased or decreased due to any such factor in the report year, provide an estimate of the amount and direction
Progress towards Perth & Kinross Council's emissions reduction targets is made publilcy available on the Perth and Kinross Climate Action website, where an annual report is published. The third annual progress report of Perth and Kinross Council's
Climate Change Strategy and Action Plan will be completed and published by November 2024. https://www.pkclimateaction.co.uk/
Climate Change progress is also reported via the Council's  Corporate Plan.
Estimated decrease or increase in emissions from other sources in the year ahead
If the body’s corporate emissions are likely to increase or decrease for any other reason in the year ahead, provide an estimate of the amount and direction.
Total carbon reduction project savings since the start of the year which the body used as a baseline for its carbon footprint
If the body has data available, estimate the total emissions savings made from projects since the start of that year ("the baseline year").
Supporting information and best practice
Provide any other relevant supporting information and any examples of best practice by the body in relation to corporate emissions, targets and projects.

Page 10

PART 4 Adaptation -  please do not include information in this part on measures that solely reduce emissions with no implications for climate adaptation. These are climate mitigation measures which should be reported in the Emissions tab.
Assessing and managing risk
4a Has the body assessed current and future climate-related risks?
4b
Taking action
4c What action has the body taken to adapt to climate change?
4d Where applicable, what contribution has the body made to helping deliver the Programme?
Provide any other relevant supporting information
Review, monitoring and evaluation
4e What arrangements does the body have in place to review current and future climate risks?
4f What arrangements does the body have in place to monitor and evaluate the impact of the adaptation actions?
Future priorities for adaptation
4g
Further information
4h
In 2021 the Council created a cross-departmental Resilience Working Group that has developed a resilience action plan that has been included in the Council's updated action plan adopted in December
2021.  We also are actively involved with the Tayside Resilience Forum, which looks at resilience planning across the Tayside Region.
Increased flooding includng scour is currently our most significant climate risk.  We are working to implement our Flood Risk Management Plan and a Bridge Scour Programme. A Tayside Adapts Partnership
was formed in Spring 2024. This involves Perth and Kinros Council, Angus Council and Dundee City Council. 
Include details of work to increase awareness of the need to adapt to climate change and build the capacity of staff and stakeholders to assess risk and implement action. The body may wish to make
reference to the Scottish Climate Change Adaptation Programme  (“the Programme”).
We have developed a staff e-learning course covering both mitigation and adaption to help build wider awareness of the need to adapt.  Awareness of the risks have been built with working group members
- many of whom are key actors (e.g. head of greenspace)
In 2023, we began climate literacy training for all Council staff that includes both adaptation and mitigation modules.
Public Sector Report on Compliance with Climate Change Duties 2024 Template
If yes, provide a reference or link to any such risk assessment(s).
We procured a consultant to  carry out a Climate Change Risk and Opportunity Assessment for Perth and Kinross Council looking at both risks for Perth and Kinross as an area and operational risks to the
Council. The Assessment was finalised in August 2023 and can be accessed via the links below.
https://www.pkclimateaction.co.uk/files/CCRA_Executive_Summary.pdf
https://www.pkclimateaction.co.uk/files/PK_CCROA_pdf.pdf
What arrangements does the body have in place to manage climate-related risks?
Provide details of any climate change adaptation strategies, action plans and risk management procedures, and any climate change adaptation policies which apply across the body.
Supporting information and best practice
Provide any other relevant supporting information and any examples of best practice by the body in relation to adaption.
Perth and Kinross Council is an active member of the Public Sector Climate Adaptation Network (organised by Adaptation Scoland, previously named Adaptation Scotland Working Group) and attends
monthly online sessions and bi-annual in person sessions with the group. Perth and Kinross Council undertook a climate risk and opportunity assessment in the reporting year and the results, as well as, the
methodology and lessons learnt from the process have been communicated with the group members and those who are at an early stage in their adaptation journey. The Council is also a member of
developing the Tayside Adapts Partnership between Angus Council, Dundee City Council, Perth and Kinross Council the Adaptation Scotland programme.
The Climate Adaptation plan will be updated annually. 
The comprehensive assessment that was undertaken in 2023 will be refreshed at minimum of five yearly cycles to align with updated risk assessments
Please provide details of monitoring and evaluation criteria and adaptation indicators used to assess the effectiveness of actions detailed under Question 4(c) and Question 4(d).
We have developed a KPI framework to monitor and evaluate the impact of the adaptation actions. These are:
Annual Adaptation Scotland Capability Framework Score
Number of community groups engaged in proactive resilience work
Red/amber/green of flood risk management actions
Number of bridge scour assessments undertaken
What are the body’s top 5 climate change adaptation priorities for the year ahead?
Provide a summary of the areas and activities of focus for the year ahead.
Undertake a strategic climate change risk and opportunity assessment for Perth and Kinross Council Area
Develop updated roads development guide to resolve conflicts with adoption criteria for SUDS with roads maintenance requirements as well as providing wider resilience benefits (e.g. shading and
biodiversity corridors and protection)
Develop and implement scour protection programme for key Council assets"
Continuing contribution and support to the delivery of Nature Rich Leven and other catchment management approaches 
Continued delivery of Flood Risk Management Cycle 1 Projects and commence Cycle 2 projects.
Provide details of arrangements to review current and future climate risks, for example, what timescales are in place to review the climate change risk assessments referred to in Question 4(a) and
adaptation strategies, action plans, procedures and policies in Question 4(b).

Page 11

PART 5 Procurement
5a How have procurement policies contributed to compliance with climate change duties?
5b How has procurement activity contributed to compliance with climate change duties?
Further information
5c Supporting information and best practice
Public Sector Report on Compliance with Climate Change Duties 2024 Template
Sustainable outcomes are included in Councils specifications.
Examples of positive outcomes delivered in 2023/24 include;
Cross Tay Link Road
Energy Performance Certificates
Consideration of the climate emissions associated with refuse and recycling collection as part of the tender evaluation for new waste contracts.
Provide any other relevant supporting information and any examples of best practice by the body in relation to procurement.
Provide information relating to how the procurement policies of the body have contributed to its compliance with climate changes duties.
A Sustainable Procurement policy was introduced a number of years ago to support the Council to comply with its climate change duties, and commits the Council to buying more sustainably which in turn
offers cost efficiency, support the Councils commitment to Corporate Social Responsibility and promotes health improvements amongst stakeholders.
Key outcomes included in the policy are
•              Reduce carbon emissions
•              Contribute to climate change adaption through procurement activity
•              Embed sustainability at the heart of procurement activity
•              Deliver a variety of sustainable outcomes
A copy of the Council's sustainability policy can be found here https://www.pkc.gov.uk/media/38287/Sustainable-procurement-policy/pdf/Sustainable_procurement_policy.pdf?m=636153429492200000
The 2024-2029 Sustainable Procurement Strategy was approved by Full Council in June 2024. https://www.pkc.gov.uk/media/52863/Sustainable-Procurement-Strategy-2024-
2029/pdf/Sustainable_Procurement_Strategy_2024-2029_FINAL.pdf?m=1719421875317
The Strategy includes an Aim of Protecting our Environment, desined to support a fair transition to net zero and minimise our environmental impact. There are a number of objectives under this aim
including influencing the reduction of carbon omissions and waste minimisation.
Provide information relating to how procurement activity by the body has contributed to its compliance with climate changes duties.

Page 12

PART 6 Validation and Declaration
6a Internal validation process
Briefly describe the body’s internal validation process, if any, of the data or information contained within this report.
6b Peer validation process
Briefly describe the body’s peer validation process, if any, of the data or information contained within this report.
6c External validation process
Briefly describe the body’s external validation process, if any, of the data or information contained within this report.
6d No Validation Process
If any information provided in this report has not been validated, identify the information in question and explain why it has not been validated.
6e Declaration
Name:
Role in the body:
Date: Date in format (dd/mm/yyyy)
Public Sector Report on Compliance with Climate Change Duties 2024 Template
I confirm that the information in this report is accurate and provides a fair representation of the body’s performance in relation to climate change.
The process is initially reviewed by Officers in the Climate Change Team and then reviewed and approved by the Climate Change Board and Climate Change and Sustainability Commiee
The Council annually submits its Local Authority Area report to CDP. The CDP report  includes an annual review of the Council's area wide targets, including mitigation and adaptation.

Page 13

Recommended Reporting: Reporting on Wider Influence
Wider Impact and Influence on GHG Emissions
Q1) Historic Emissions (Local Authorities Only)
Please indicate emission amounts and unit of measurement (e.g. tCO2e) and years. Please provide information on the following components using data from the links provided below. Please use (1) as the default unless targets and actions relate to (2).
Please note : territorial emissions of carbon dioxide (CO2), methane (CH4) and nitrous oxide (N2O) are provided, but not fluorinated gases, which are also included in the UK territorial greenhouse gas emissions statistics. Prior to the 2005 to 2020 publication the statistics covered emissions of carbon dioxide only
(1) UK local and regional CO2e emissions: subset dataset (emissions within the scope of influence of local authorities):
(2) UK local and regional CO2e emissions: full dataset:
https://data.gov.uk/dataset/723c243d-2f1a-4d27-8b61-cdb93e5b10ff/emissions-of-carbon-dioxide-for-local-authority-areas
Local Authority:(Please State) Perth and Kinross
DESNZ Dataset:(full or sub-set) Full
Source Sector 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Units Comments
4 Total Emissions                                                                  1,143.59                               1,167.83                                                                1,140.61                      1,100.00                                                                     1,046.51                            1,009.02                                                                  1,007.04                          987.70                                                                                               951.39                                                                                       800.53                                                                                                                                                                  883.55                                                                               878.06 ktCO2e
1 Industry and Commercial                                                                      218.62                                  227.18                                                                   217.33                          226.49                                                                        175.73                                151.65                                                                     145.64                          145.29                                                                                               126.31                                                                                       108.00                                                                                                                                                                  147.40                                                                               133.76 ktCO2e
2 Domestic                                                                      396.62                                  425.22                                                                   406.02                          347.20                                                                        332.14                                303.10                                                                     291.14                          285.97                                                                                               278.71                                                                                       263.90                                                                                                                                                                  271.52                                                                               239.89 ktCO2e
3 Transport total                                                                      528.35                                  515.43                                                                   517.25                          526.31                                                                        538.64                                554.27                                                                     570.27                          556.44                                                                                               546.37                                                                                       428.64                                                                                                                                                                  464.62                                                                               504.41 ktCO2e
5 Per Capita                                                                        11.03                                    11.41                                                                     10.87                            10.41                                                                             9.83                                    9.29                                                                          9.23                              9.04                                                                                                    8.69                                                                                            7.82                                                                                                                                                                      8.42                                                                                    8.33 ktCO2e
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box
2a) Targets
Please detail your wider influence targets
Sector Type of Target (units) Baseline value Start year Target Target/End year Saving in latest year
measured Latest Year Measured
Overall Reduction Target Absolute (TCO2) 1452413.1 2005 0.0 2045 47.9 2022
Overall Reduction Target Absolute (TCO2) 1551.0 1990 388.0 2030 47.9 2022
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
2b) Does the organisation have an overall mission statement, strategies, plans or policies outlining ambition to influence emissions beyond your corporate boundaries? If so, please detail this in the box below.
Q3) Policies and Actions to Reduce Emissions
Please detail any of the specific policies and actions which are underway to achieve your emission reduction targets
Sector Start year for policy/action implementation Year that the policy/action will be fully
implemented
Annual CO2 saving once
fully implemented (tCO2) Latest Year measured Saving in latest year
measured (tCO2) Delivery Role During project/policy design and implementation, has
ISM or an equivilent behaviour change tool been used? Please give further details of this behaviour change activity. Value of Investment (£) Ongoing Costs (£/year) Primary Funding Source for Implementation of Policy/Action
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box Please select from drop down box
Please provide any detail on data sources or limitations relating to the information provided in Table 3
Q4) Partnership Working, Communications and Capacity Building
Please detail your Climate Change Partnership, Communication or Capacity Building Initiatives below.
Organisation's project role Lead Organisation (if not
reporting organisation) Private Partners Public Partners 3rd Sector Partners Outputs Comments
Supporting Commissioners while varied in experience do not formally represent their organisation on the
Commission and instead have joined in an indivdiaul capacity
Participant Perth and Kinross
Countryside Trust
Nature Scot, Forestry
Scotland, Cairngorms
NPA, Loch Lommond
and the Trussochs
NPA
NFU
Lead The Perth and Kinross Climate Action website and social media are used to promote both Council
and community initiatives relating to climate action.
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Q5) Please detail key actions relating to Food
and Drink, Biodiversity, Water, Procurement
and Resource Use in the table below
Key Action Type
Food & Drink
Biodiversity
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
A food partnership will encourage more collaborative working by
enabling connections to be made between those working across the
food themes and in turn, making better use of time and resource. The
partnership may also lead to greater funding opportunities.
Addressing the food themes collectively will derive significantly more
Please select from drop down box
Please select from drop down box
Actions will protect and restore Scotland's biodiversity and help
create nature networks for species to migrate in a warming climate.
There are additional community empowerment impacts through the
delivery of the nature restoration fund.
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Partnership Working Perthshire Nature Connections Partnership - Exploring landscape scale change across Perth and Kinross
Communications Perth and Kinross Climate Action Website and social media (Facebook, Twitter, Instagram)
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Key Action Description
Metric/indicators for monitoring progress
Perth & Kinross Council Climate Change Strategy and Action Plan https://www.pkclimateaction.co.uk/climate-change-strategy-and-action-plan
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Other Notable Reportable Activity
Organisation's Project Role
Please select from drop down box
Please select from drop down box
Please select from drop down box
Description
Net Zero for Perth and Kinross by 2045
75% reduction by 2030
Status
Please select from drop down box
Please select from drop down box
Comments
Area wide total greenhouse emissions in 2022 have reduced by 3.67%  compared to the 2021 values
Area wide total greenhouse emissions in 2022 have reduced by 3.67%  compared to the 2021 values
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Good Food Project Officer appointed to work with local community groups and partners to establish a food partnership for the council area and to develop a food strategy and action plan. Climate
and biodiversity concerns will be addressed as a key theme within this work. Specific objectives include promoting sustainable food production and consumption and resource efficiency and
identifying ways to reduce, redirect, and recycle food, packaging, and related waste. These themes overlap with themes addressing procurement, catering and the local food economy - which seek to
source more local food, reducing food miles and carbon footprint as a consequence.
Please select from drop down box
Q6) Please use the text box below to detail further climate change related activity that is not noted elsewhere within this reporting template
Planning applications are screened by the Tree and Biodiversity Officer for potential impacts on biodiversity; PKC respond to Scottish Foresty Consultations to promote sustainable forest
management and planting the right type of woodland in the right place to enhance landscape and biodiversity as well as enhancing carbon capture and storage. Emphasis on native species,
enhancing connectivity of habitats and creating opportunities for public access is encouraged; PKC Community Greenspace changed the grass management regime with a Grassland Management
Trails in response to an action in the Climate Action Plan and several requests from communities to manage more parks and greenspaces for the benefit of biodiversity; PKC are members of the
Perth & Kinross INNS Working Group led by NatureScot with Scottish Forestry, SEPA and TBP.  Through the DM process and new Planning for Nature Guidance, we require INNS management plans
be submitted detailing eradication plans when INNS are present on site; For the past three years,  PKC has been awarded a capital grant of the Scottish Government’s Nature Restoration Fund.
Although the award was intended to be spent on Council land or buildings, in line with the Perth & Kinross Offer, the Council has been able to provide support to community-led biodiversity
Please select from drop down box
Please select from drop down box
Please select from drop down box
CommentsImpacts
Supporting
Please select from drop down box
Comments
Key Action Type Description
Please select from drop down box
Please select from drop down box
DESNZ Sectors
Other Sectors
Please select from drop down box
Partnership Working
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Please select from drop down box
Establishment of a Perth and Kinross Climate Change Commission

Page 14

Scope Level 1 Level 3 UOM GHG Conversion Factor 2023
(kgCO2e/unit)
Scope 1 Bioenergy Biogas kWh 0.00022
Scope 1 Bioenergy Biogas tonnes 1.23595
Scope 1 Bioenergy Landfill gas kWh 0.00020
Scope 1 Bioenergy Wood chips kWh 0.01074
Scope 1 Bioenergy Wood chips tonnes 40.58114
Scope 1 Bioenergy Wood pellets kWh 0.01074
Scope 1 Bioenergy Wood pellets tonnes 51.56192
Scope 2 Electricity Electricity: UK kWh 0.20707
Scope 3 Electricity Transmission and distribution - Electricity: UK kWh 0.01792
Scope 1 Fuels Aviation spirit kWh 0.24382
Scope 1 Fuels Aviation spirit litres 2.33116
Scope 1 Fuels Aviation turbine fuel kWh 0.24758
Scope 1 Fuels Aviation turbine fuel litres 2.54269
Scope 1 Fuels Burning oil (Kerosene) kWh 0.24677
Scope 1 Fuels Burning oil (Kerosene) litres 2.54016
Scope 1 Fuels Burning oil (Kerosene) tonnes 3165.04181
Scope 1 Fuels Coal (industrial) tonnes 2396.47994
Scope 1 Fuels Diesel (100% mineral diesel) litres 2.65937
Scope 1 Fuels Diesel (average biofuel blend) litres 2.51206
Scope 1 Fuels Fuel oil kWh 0.26813
Scope 1 Fuels Fuel oil litres 3.17492
Scope 1 Fuels Fuel oil tonnes 3228.89019
Scope 1 Fuels Gas oil kWh 0.25650
Scope 1 Fuels Gas oil litres 2.75541
Scope 1 Fuels Gas oil tonnes 3226.57859
Scope 1 Fuels LPG kWh 0.21450
UK Government GHG Conversion Factors for Company Reporting
Factors by Category
Category

Page 15

Scope 1 Fuels LPG litres 1.55713
Scope 1 Fuels Marine fuel oil litres 3.10202
Scope 1 Fuels Marine gas oil litres 2.77139
Scope 1 Fuels Natural gas kWh 0.18293
Scope 1 Fuels Petrol (100% mineral petrol) litres 2.34503
Scope 1 Fuels Petrol (average biofuel blend) litres 2.09747
Scope 1 Fuels Propane kWh 0.21410
Scope 1 Fuels Propane litres 1.54358
Scope 1 Fuels Waste oils kWh 0.25641
Scope 1 Fuels Waste oils litres 2.74924
Scope 1 Fuels Waste oils tonnes 3219.37916
Scope 2 Heat and steam District heat and steam kWh 0.17965
Scope 2 Heat and steam Onsite heat and steam kWh 0.17965
Scope 3 Heat and steam Transmission and distribution - district heat & steam, 5% loss kWh 0.00945
Scope 3 Homeworking Homeworking (office equipment + heating) FTE Working Hour 0.33378
Scope 3 Hotel stay Hotel stay - UK Room per night 10.40000
Scope 3 Hotel stay Hotel stay - UK (London) Room per night 11.50000
Scope 3 Material use Aggregates - Primary material production tonnes 7.75138
Scope 3 Material use Aggregates - Recycled source tonnes 3.19491
Scope 3 Material use Aggregates - Re-used tonnes 2.21000
Scope 3 Material use Asbestos - Primary material production tonnes 27.00000
Scope 3 Material use Asphalt - Primary material production tonnes 39.21249
Scope 3 Material use Asphalt - Recycled source tonnes 28.65491
Scope 3 Material use Asphalt - Re-used tonnes 1.73826
Scope 3 Material use Average construction - Primary material production tonnes 80.21282
Scope 3 Material use Batteries - Alkaline - Primary material production tonnes 4633.47826
Scope 3 Material use Batteries - Li ion - Primary material production tonnes 6308.00000
Scope 3 Material use Batteries - NiMh - Primary material production tonnes 28380.00000
Scope 3 Material use Bricks - Primary material production tonnes 241.75138
Scope 3 Material use Clothing - Primary material production tonnes 22310.00000
Scope 3 Material use Clothing - Re-used tonnes 152.25000
Scope 3 Material use Compost derived from food and garden waste - Primary material productiontonnes 114.83405
Scope 3 Material use Compost derived from garden waste - Primary material production tonnes 112.01742
Scope 3 Material use Concrete - Primary material production tonnes 131.75138

Page 16

Scope 3 Material use Concrete - Recycled source tonnes 3.19491
Scope 3 Material use Electrical items - fridges and freezers - Primary material production tonnes 4363.33333
Scope 3 Material use Electrical items - IT - Primary material production tonnes 24865.47556
Scope 3 Material use Electrical items - large - Primary material production tonnes 3267.00000
Scope 3 Material use Electrical items - small - Primary material production tonnes 5647.94563
Scope 3 Material use Food and drink - Primary material production tonnes 3701.40359
Scope 3 Material use Glass - Primary material production tonnes 1402.76667
Scope 3 Material use Glass - Recycled source tonnes 823.18954
Scope 3 Material use Insulation - Primary material production tonnes 1861.75138
Scope 3 Material use Insulation - Recycled source tonnes 1852.08125
Scope 3 Material use Metal: aluminium cans and foil (excl. forming) - Primary material productiontonnes 9108.72731
Scope 3 Material use Metal: aluminium cans and foil (excl. forming) - Recycled source tonnes 990.47810
Scope 3 Material use Metal: mixed cans - Primary material production tonnes 5254.64731
Scope 3 Material use Metal: mixed cans - Recycled source tonnes 1461.67759
Scope 3 Material use Metal: scrap metal - Primary material production tonnes 3669.43615
Scope 3 Material use Metal: scrap metal - Recycled source tonnes 1620.27606
Scope 3 Material use Metal: steel cans - Primary material production tonnes 3086.72731
Scope 3 Material use Metal: steel cans - Recycled source tonnes 1726.72731
Scope 3 Material use Metals - Primary material production tonnes 4005.13777
Scope 3 Material use Metals - Recycled source tonnes 1558.94894
Scope 3 Material use Mineral oil - Primary material production tonnes 1401.00000
Scope 3 Material use Mineral oil - Recycled source tonnes 676.00000
Scope 3 Material use Paper and board: board - Primary material production tonnes 801.52177
Scope 3 Material use Paper and board: board - Recycled source tonnes 699.88184
Scope 3 Material use Paper and board: mixed - Primary material production tonnes 868.06994
Scope 3 Material use Paper and board: mixed - Recycled source tonnes 718.56937
Scope 3 Material use Paper and board: paper - Primary material production tonnes 910.47810
Scope 3 Material use Paper and board: paper - Recycled source tonnes 730.47810
Scope 3 Material use Plasterboard - Primary material production tonnes 120.05000
Scope 3 Material use Plasterboard - Recycled source tonnes 32.17000
Scope 3 Material use Plastics: average plastic film - Primary material production tonnes 2560.25566
Scope 3 Material use Plastics: average plastic film - Recycled source tonnes 1890.70135
Scope 3 Material use Plastics: average plastic rigid - Primary material production tonnes 3263.92202
Scope 3 Material use Plastics: average plastic rigid - Recycled source tonnes 2744.09248

Page 17

Scope 3 Material use Plastics: average plastics - Primary material production tonnes 3102.44851
Scope 3 Material use Plastics: average plastics - Recycled source tonnes 2322.22425
Scope 3 Material use Plastics: HDPE (incl. forming) - Primary material production tonnes 3255.92980
Scope 3 Material use Plastics: HDPE (incl. forming) - Recycled source tonnes 2346.68907
Scope 3 Material use Plastics: LDPE and LLDPE (incl. forming) - Primary material productiontonnes 2586.72731
Scope 3 Material use Plastics: LDPE and LLDPE (incl. forming) - Recycled source tonnes 1793.29541
Scope 3 Material use Plastics: PET (incl. forming) - Primary material production tonnes 4018.48341
Scope 3 Material use Plastics: PET (incl. forming) - Recycled source tonnes 3121.34429
Scope 3 Material use Plastics: PP (incl. forming) - Primary material production tonnes 3090.81790
Scope 3 Material use Plastics: PP (incl. forming) - Recycled source tonnes 2537.38600
Scope 3 Material use Plastics: PS (incl. forming) - Primary material production tonnes 3764.03981
Scope 3 Material use Plastics: PS (incl. forming) - Recycled source tonnes 3187.08199
Scope 3 Material use Plastics: PVC (incl. forming) - Primary material production tonnes 3399.17507
Scope 3 Material use Plastics: PVC (incl. forming) - Recycled source tonnes 2485.74317
Scope 3 Material use Soils - Recycled source tonnes 0.98491
Scope 3 Material use Tyres - Primary material production tonnes 3335.57190
Scope 3 Material use Tyres - Re-used tonnes 731.21789
Scope 3 Material use Wood - Primary material production tonnes 312.61178
Scope 3 Material use Wood - Recycled source tonnes 112.96968
Scope 3 Material use Wood - Re-used tonnes 38.54288
Scope 1 Process Desflurane kg 2540.00000
Scope 1 Process Sevoflurane kg 130.00000
Scope 1 Process Isoflurane kg 510.00000
Scope 1 Process Anaesthetic Nitrous Oxide kg 298.00000
Scope 1 Refrigerants HFC-134a kg 1300.00000
Scope 1 Refrigerants HFC-32 kg 677.00000
Scope 1 Refrigerants R404A kg 3943.00000
Scope 1 Refrigerants R407C kg 1624.00000
Scope 1 Refrigerants R410A kg 1924.00000
Scope 1 Refrigerants R422D kg 2473.00000
Scope 1 Refrigerants R422E kg 2350.00000
Scope 1 Refrigerants R423A kg 2274.00000
Scope 1 Refrigerants R424A kg 2212.00000
Scope 1 Refrigerants R425A kg 1431.00000

Page 18

Scope 1 Refrigerants R426A kg 1371.00000
Scope 1 Refrigerants R427A kg 2024.00000
Scope 1 Refrigerants R428A kg 3417.00000
Scope 1 Refrigerants R429A kg 13.80000
Scope 1 Refrigerants R430A kg 106.00000
Scope 1 Refrigerants R431A kg 40.00000
Scope 1 Refrigerants R432A kg 1.80000
Scope 1 Refrigerants R433A kg 0.64000
Scope 1 Refrigerants R433B kg 0.16000
Scope 1 Refrigerants R433C kg 0.55000
Scope 1 Refrigerants R434A kg 3075.00000
Scope 1 Refrigerants R435A kg 28.40000
Scope 1 Refrigerants R436A kg 1.35000
Scope 1 Refrigerants R436B kg 1.47000
Scope 1 Refrigerants R437A kg 1639.00000
Scope 1 Refrigerants R438A kg 2059.00000
Scope 1 Refrigerants R439A kg 1828.00000
Scope 1 Refrigerants R440A kg 156.00000
Scope 1 Refrigerants R441A kg 0.23000
Scope 1 Refrigerants R442A kg 1754.00000
Scope 1 Refrigerants R443A kg 1.00000
Scope 1 Refrigerants R444A kg 89.00000
Scope 1 Refrigerants R445A kg 118.00000
Scope 1 Refrigerants R500 kg 7564.00000
Scope 1 Refrigerants R501 kg 3870.00000
Scope 1 Refrigerants R502 kg 4786.00000
Scope 1 Refrigerants R503 kg 13299.00000
Scope 1 Refrigerants R504 kg 4299.00000
Scope 1 Refrigerants R505 kg 7956.00000
Scope 1 Refrigerants R506 kg 3857.00000
Scope 1 Refrigerants R507A kg 3985.00000
Scope 1 Refrigerants R508A kg 11607.00000
Scope 1 Refrigerants R508B kg 11698.00000
Scope 1 Refrigerants R509A kg 5758.00000

Page 19

Scope 1 Refrigerants R510A kg 1.24000
Scope 1 Refrigerants R511A kg 7.00000
Scope 1 Refrigerants R512A kg 196.00000
Scope 1 Refrigerants R600 = butane kg 0.00600
Scope 1 Refrigerants R600A = isobutane kg 3.00000
Scope 1 Refrigerants R601 = pentane kg 5.00000
Scope 1 Refrigerants R601A = isopentane kg 5.00000
Scope 2 Renewables Renewable Elec Purchase Direct Supply kWh 0.00000
Scope 2 Renewables Renewable Heat Purchase Direct Supply kWh 0.00000
Scope 2&3 Transport - car Average business travel car - Battery Electric Vehicle km 0.05480
Scope 2&3 Transport - car Average business travel car - Battery Electric Vehicle miles 0.08819
Scope 2&3 Transport - car Average business travel car - Plug-in Hybrid Electric Vehicle km 0.09392
Scope 2&3 Transport - car Average business travel car - Plug-in Hybrid Electric Vehicle miles 0.15113
Scope 3 Transport - car Average car - Diesel km 0.16983
Scope 3 Transport - car Average car - Diesel miles 0.27332
Scope 3 Transport - car Average car - Hybrid km 0.11898
Scope 3 Transport - car Average car - Hybrid miles 0.19147
Scope 3 Transport - car Average car - Petrol km 0.16391
Scope 3 Transport - car Average car - Petrol miles 0.26379
Scope 3 Transport - car Average car - Unknown km 0.16664
Scope 3 Transport - car Average car - Unknown miles 0.26817
Scope 1 Transport - car Average fleet car - Battery Electric Vehicle km 0.00000
Scope 1 Transport - car Average fleet car - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - car Average fleet car - Plug-in Hybrid Electric Vehicle km 0.06588
Scope 1 Transport - car Average fleet car - Plug-in Hybrid Electric Vehicle miles 0.10601
Scope 2&3 Transport - car Large business travel car - Battery Electric Vehicle km 0.05797
Scope 2&3 Transport - car Large business travel car - Battery Electric Vehicle miles 0.09330
Scope 2&3 Transport - car Large business travel car - Plug-in Hybrid Electric Vehicle km 0.10158
Scope 2&3 Transport - car Large business travel car - Plug-in Hybrid Electric Vehicle miles 0.16349
Scope 3 Transport - car Large car - Diesel km 0.20859
Scope 3 Transport - car Large car - Diesel miles 0.33570
Scope 3 Transport - car Large car - Hybrid km 0.15244
Scope 3 Transport - car Large car - Hybrid miles 0.24530
Scope 3 Transport - car Large car - Petrol km 0.27224

Page 20

Scope 3 Transport - car Large car - Petrol miles 0.43812
Scope 3 Transport - car Large car - Unknown km 0.22612
Scope 3 Transport - car Large car - Unknown miles 0.36389
Scope 1 Transport - car Large fleet car - Battery Electric Vehicle km 0.00000
Scope 1 Transport - car Large fleet car - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - car Large fleet car - Plug-in Hybrid Electric Vehicle km 0.07082
Scope 1 Transport - car Large fleet car - Plug-in Hybrid Electric Vehicle miles 0.11397
Scope 2&3 Transport - car Medium business travel car - Battery Electric Vehicle km 0.05257
Scope 2&3 Transport - car Medium business travel car - Battery Electric Vehicle miles 0.08458
Scope 2&3 Transport - car Medium business travel car - Plug-in Hybrid Electric Vehicle km 0.08501
Scope 2&3 Transport - car Medium business travel car - Plug-in Hybrid Electric Vehicle miles 0.13680
Scope 3 Transport - car Medium car - Diesel km 0.16716
Scope 3 Transport - car Medium car - Diesel miles 0.26902
Scope 3 Transport - car Medium car - Hybrid km 0.10904
Scope 3 Transport - car Medium car - Hybrid miles 0.17549
Scope 3 Transport - car Medium car - Petrol km 0.17819
Scope 3 Transport - car Medium car - Petrol miles 0.28676
Scope 3 Transport - car Medium car - Unknown km 0.17246
Scope 3 Transport - car Medium car - Unknown miles 0.27754
Scope 1 Transport - car Medium fleet car - Battery Electric Vehicle km 0.00000
Scope 1 Transport - car Medium fleet car - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - car Medium fleet car - Plug-in Hybrid Electric Vehicle km 0.06144
Scope 1 Transport - car Medium fleet car - Plug-in Hybrid Electric Vehicle miles 0.09887
Scope 3 Transport - car Motorbike - Average km 0.11367
Scope 3 Transport - car Motorbike - Average miles 0.18294
Scope 2&3 Transport - car Small business travel car - Battery Electric Vehicle km 0.04823
Scope 2&3 Transport - car Small business travel car - Battery Electric Vehicle miles 0.07763
Scope 2&3 Transport - car Small business travel car - Plug-in Hybrid Electric Vehicle km 0.05402
Scope 2&3 Transport - car Small business travel car - Plug-in Hybrid Electric Vehicle miles 0.08694
Scope 3 Transport - car Small car - Diesel km 0.13931
Scope 3 Transport - car Small car - Diesel miles 0.22420
Scope 3 Transport - car Small car - Hybrid km 0.10150
Scope 3 Transport - car Small car - Hybrid miles 0.16336
Scope 3 Transport - car Small car - Petrol km 0.14080

Page 21

Scope 3 Transport - car Small car - Petrol miles 0.22660
Scope 3 Transport - car Small car - Unknown km 0.14037
Scope 3 Transport - car Small car - Unknown miles 0.22591
Scope 1 Transport - car Small fleet car - Battery Electric Vehicle km 0.00000
Scope 1 Transport - car Small fleet car - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - car Small fleet car - Plug-in Hybrid Electric Vehicle km 0.02163
Scope 1 Transport - car Small fleet car - Plug-in Hybrid Electric Vehicle miles 0.03481
Scope 3 Transport - public Average local bus passenger.km 0.10215
Scope 3 Transport - public Black cab km 0.30604
Scope 3 Transport - public Black cab passenger.km 0.20402
Scope 3 Transport - public Coach passenger.km 0.02718
Scope 3 Transport - public Ferry - Average (all passenger) passenger.km 0.11270
Scope 3 Transport - public Ferry - Car passenger passenger.km 0.12933
Scope 3 Transport - public Ferry - Foot passenger passenger.km 0.01871
Scope 3 Transport - public Flights - Domestic, to/from UK - Average passenger passenger.km 0.27258
Scope 3 Transport - public Flights - International, to/from non-UK - Average passenger passenger.km 0.17580
Scope 3 Transport - public Flights - International, to/from non-UK - Business class passenger.km 0.39044
Scope 3 Transport - public Flights - International, to/from non-UK - Economy class passenger.km 0.13464
Scope 3 Transport - public Flights - International, to/from non-UK - First class passenger.km 0.53854
Scope 3 Transport - public Flights - International, to/from non-UK - Premium economy class passenger.km 0.21542
Scope 3 Transport - public Flights - Long-haul, to/from UK - Average passenger passenger.km 0.26128
Scope 3 Transport - public Flights - Long-haul, to/from UK - Business class passenger.km 0.58029
Scope 3 Transport - public Flights - Long-haul, to/from UK - Economy class passenger.km 0.20011
Scope 3 Transport - public Flights - Long-haul, to/from UK - First class passenger.km 0.80040
Scope 3 Transport - public Flights - Long-haul, to/from UK - Premium economy class passenger.km 0.32016
Scope 3 Transport - public Flights - Short-haul, to/from UK - Average passenger passenger.km 0.18592
Scope 3 Transport - public Flights - Short-haul, to/from UK - Business class passenger.km 0.27430
Scope 3 Transport - public Flights - Short-haul, to/from UK - Economy class passenger.km 0.18287
Scope 3 Transport - public International rail passenger.km 0.00446
Scope 3 Transport - public Light rail and tram passenger.km 0.02860
Scope 3 Transport - public Local bus (not London) passenger.km 0.11836
Scope 3 Transport - public Local London bus passenger.km 0.07832
Scope 3 Transport - public London Underground passenger.km 0.02780
Scope 3 Transport - public National rail passenger.km 0.03546

Page 22

Scope 3 Transport - public Regular taxi km 0.20806
Scope 3 Transport - public Regular taxi passenger.km 0.14861
Scope 2&3 Transport - van/HGV Business Travel Van - Average (up to 3.5 tonnes) - Battery Electric Vehiclekm 0.07346
Scope 2&3 Transport - van/HGV Business Travel Van - Average (up to 3.5 tonnes) - Battery Electric Vehiclemiles 0.11824
Scope 2&3 Transport - van/HGV Business Travel Van - Class I (up to 1.305 tonnes) - Battery Electric Vehiclekm 0.03850
Scope 2&3 Transport - van/HGV Business Travel Van - Class I (up to 1.305 tonnes) - Battery Electric Vehiclemiles 0.06197
Scope 2&3 Transport - van/HGV Business Travel Van - Class II (1.305 to 1.74 tonnes) - Battery Electric Vehiclekm 0.05932
Scope 2&3 Transport - van/HGV Business Travel Van - Class II (1.305 to 1.74 tonnes) - Battery Electric Vehiclemiles 0.09547
Scope 2&3 Transport - van/HGV Business Travel Van - Class III (1.74 to 3.5 tonnes) - Battery Electric Vehiclekm 0.08967
Scope 2&3 Transport - van/HGV Business Travel Van - Class III (1.74 to 3.5 tonnes) - Battery Electric Vehiclemiles 0.14430
Scope 1 Transport - van/HGV Fleet Van - Average (up to 3.5 tonnes) - Battery Electric Vehicle km 0.00000
Scope 1 Transport - van/HGV Fleet Van - Average (up to 3.5 tonnes) - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - van/HGV Fleet Van - Class I (up to 1.305 tonnes) - Battery Electric Vehicle km 0.00000
Scope 1 Transport - van/HGV Fleet Van - Class I (up to 1.305 tonnes) - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - van/HGV Fleet Van - Class II (1.305 to 1.74 tonnes) - Battery Electric Vehicle km 0.00000
Scope 1 Transport - van/HGV Fleet Van - Class II (1.305 to 1.74 tonnes) - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - van/HGV Fleet Van - Class III (1.74 to 3.5 tonnes) - Battery Electric Vehicle km 0.00000
Scope 1 Transport - van/HGV Fleet Van - Class III (1.74 to 3.5 tonnes) - Battery Electric Vehicle miles 0.00000
Scope 1 Transport - van/HGV HGV (all diesel) - All artics - Average laden km 0.90644
Scope 1 Transport - van/HGV HGV (all diesel) - All artics - Average laden miles 1.45877
Scope 1 Transport - van/HGV HGV (all diesel) - All HGVs - Average laden km 0.87205
Scope 1 Transport - van/HGV HGV (all diesel) - All HGVs - Average laden miles 1.40341
Scope 1 Transport - van/HGV HGV (all diesel) - All rigids - Average laden km 0.82313
Scope 1 Transport - van/HGV HGV (all diesel) - All rigids - Average laden miles 1.32470
Scope 1 Transport - van/HGV HGVs refrigerated (all diesel) - All artics - Average laden km 1.04867
Scope 1 Transport - van/HGV HGVs refrigerated (all diesel) - All artics - Average laden miles 1.68766
Scope 1 Transport - van/HGV HGVs refrigerated (all diesel) - All HGVs - Average laden km 1.02098
Scope 1 Transport - van/HGV HGVs refrigerated (all diesel) - All HGVs - Average laden miles 1.64310
Scope 1 Transport - van/HGV HGVs refrigerated (all diesel) - All rigids - Average laden km 0.98025
Scope 1 Transport - van/HGV HGVs refrigerated (all diesel) - All rigids - Average laden miles 1.57754
Scope 1 Transport - van/HGV Vans - Average (up to 3.5 tonnes) - Diesel km 0.23128
Scope 1 Transport - van/HGV Vans - Average (up to 3.5 tonnes) - Diesel miles 0.37224
Scope 1 Transport - van/HGV Vans - Average (up to 3.5 tonnes) - Petrol km 0.20132
Scope 1 Transport - van/HGV Vans - Average (up to 3.5 tonnes) - Petrol miles 0.32400

Page 23

Scope 1 Transport - van/HGV Vans - Average (up to 3.5 tonnes) - Unknown km 0.23037
Scope 1 Transport - van/HGV Vans - Average (up to 3.5 tonnes) - Unknown miles 0.37075
Scope 1 Transport - van/HGV Vans - Class I (up to 1.305 tonnes) - Diesel km 0.14212
Scope 1 Transport - van/HGV Vans - Class I (up to 1.305 tonnes) - Diesel miles 0.22875
Scope 1 Transport - van/HGV Vans - Class I (up to 1.305 tonnes) - Petrol km 0.18217
Scope 1 Transport - van/HGV Vans - Class I (up to 1.305 tonnes) - Petrol miles 0.29318
Scope 1 Transport - van/HGV Vans - Class II (1.305 to 1.74 tonnes) - Diesel km 0.17405
Scope 1 Transport - van/HGV Vans - Class II (1.305 to 1.74 tonnes) - Diesel miles 0.28013
Scope 1 Transport - van/HGV Vans - Class II (1.305 to 1.74 tonnes) - Petrol km 0.19594
Scope 1 Transport - van/HGV Vans - Class II (1.305 to 1.74 tonnes) - Petrol miles 0.31534
Scope 1 Transport - van/HGV Vans - Class III (1.74 to 3.5 tonnes) - Diesel km 0.25346
Scope 1 Transport - van/HGV Vans - Class III (1.74 to 3.5 tonnes) - Diesel miles 0.40792
Scope 1 Transport - van/HGV Vans - Class III (1.74 to 3.5 tonnes) - Petrol km 0.31444
Scope 1 Transport - van/HGV Vans - Class III (1.74 to 3.5 tonnes) - Petrol miles 0.50605
Scope 3 Waste Aggregates - Landfill tonnes 1.23401
Scope 3 Waste Aggregates - Recycled tonnes 0.98491
Scope 3 Waste Asbestos - Landfill tonnes 5.91332
Scope 3 Waste Asphalt - Landfill tonnes 1.23401
Scope 3 Waste Asphalt - Recycled tonnes 0.98491
Scope 3 Waste Average construction - Combustion tonnes 21.28081
Scope 3 Waste Average construction - Recycled tonnes 0.98491
Scope 3 Waste Batteries - Landfill tonnes 8.88413
Scope 3 Waste Batteries - Recycled tonnes 21.28081
Scope 3 Waste Books - Combustion tonnes 21.07310
Scope 3 Waste Books - Landfill tonnes 1164.09963
Scope 3 Waste Books - Recycled tonnes 21.07310
Scope 3 Waste Bricks - Landfill tonnes 1.23401
Scope 3 Waste Clinical Waste - Orange Stream tonnes 273.00000
Scope 3 Waste Clinical Waste - Other tonnes 1000.00000
Scope 3 Waste Clinical Waste - Red Stream tonnes 1000.00000
Scope 3 Waste Clinical Waste - Yellow Stream tonnes 297.00000
Scope 3 Waste Clothing - Combustion tonnes 21.28081
Scope 3 Waste Clothing - Landfill tonnes 496.68331
Scope 3 Waste Clothing - Recycled tonnes 21.28081

Page 24

Scope 3 Waste Commercial and industrial waste - Combustion tonnes 21.28081
Scope 3 Waste Commercial and industrial waste - Landfill tonnes 520.33474
Scope 3 Waste Concrete - Landfill tonnes 1.23401
Scope 3 Waste Concrete - Recycled tonnes 0.98491
Scope 3 Waste Glass - Combustion tonnes 21.28081
Scope 3 Waste Glass - Landfill tonnes 8.88413
Scope 3 Waste Glass - Recycled tonnes 21.28081
Scope 3 Waste Household/Municipal/Domestic waste - Combustion tonnes 21.28081
Scope 3 Waste Household/Municipal/Domestic waste - Landfill tonnes 497.04471
Scope 3 Waste Mixed dry recyclates - Recycled tonnes 21.28081
Scope 3 Waste Insulation - Landfill tonnes 1.23401
Scope 3 Waste Insulation - Recycled tonnes 0.98491
Scope 3 Waste Metal: aluminium cans and foil (excl. forming) - Combustion tonnes 21.28081
Scope 3 Waste Metal: aluminium cans and foil (excl. forming) - Landfill tonnes 8.88413
Scope 3 Waste Metal: aluminium cans and foil (excl. forming) - Recycled tonnes 21.28081
Scope 3 Waste Metal: mixed cans - Combustion tonnes 21.28081
Scope 3 Waste Metal: mixed cans - Landfill tonnes 8.88413
Scope 3 Waste Metal: mixed cans - Recycled tonnes 21.28081
Scope 3 Waste Metal: scrap metal - Combustion tonnes 21.28081
Scope 3 Waste Metal: scrap metal - Landfill tonnes 8.88413
Scope 3 Waste Metal: scrap metal - Recycled tonnes 21.28081
Scope 3 Waste Metal: steel cans - Combustion tonnes 21.28081
Scope 3 Waste Metal: steel cans - Landfill tonnes 8.88413
Scope 3 Waste Metal: steel cans - Recycled tonnes 21.28081
Scope 3 Waste Metals - Landfill tonnes 1.26435
Scope 3 Waste Metals - Recycled tonnes 0.98491
Scope 3 Waste Mineral oil - Combustion tonnes 21.28081
Scope 3 Waste Mineral oil - Recycled tonnes 21.28081
Scope 3 Waste Organic: food and drink waste - Anaerobic digestion tonnes 8.91242
Scope 3 Waste Organic: food and drink waste - Combustion tonnes 21.28081
Scope 3 Waste Organic: food and drink waste - Composting tonnes 8.91242
Scope 3 Waste Organic: food and drink waste - Landfill tonnes 700.20988
Scope 3 Waste Organic: garden waste - Anaerobic digestion tonnes 8.91242
Scope 3 Waste Organic: garden waste - Combustion tonnes 21.28081

Page 25

Scope 3 Waste Organic: garden waste - Composting tonnes 8.91242
Scope 3 Waste Organic: garden waste - Landfill tonnes 646.60659
Scope 3 Waste Organic: mixed food and garden waste - Anaerobic digestion tonnes 8.91242
Scope 3 Waste Organic: mixed food and garden waste - Combustion tonnes 21.28081
Scope 3 Waste Organic: mixed food and garden waste - Composting tonnes 8.91242
Scope 3 Waste Organic: mixed food and garden waste - Landfill tonnes 655.98717
Scope 3 Waste Paper and board: board - Combustion tonnes 21.28081
Scope 3 Waste Paper and board: board - Composting tonnes 8.91242
Scope 3 Waste Paper and board: board - Landfill tonnes 1164.39042
Scope 3 Waste Paper and board: board - Recycled tonnes 21.28081
Scope 3 Waste Paper and board: mixed - Combustion tonnes 21.28081
Scope 3 Waste Paper and board: mixed - Composting tonnes 8.91242
Scope 3 Waste Paper and board: mixed - Landfill tonnes 1164.39042
Scope 3 Waste Paper and board: mixed - Recycled tonnes 21.28081
Scope 3 Waste Paper and board: paper - Combustion tonnes 21.28081
Scope 3 Waste Paper and board: paper - Composting tonnes 8.91242
Scope 3 Waste Paper and board: paper - Landfill tonnes 1164.39042
Scope 3 Waste Paper and board: paper - Recycled tonnes 21.28081
Scope 3 Waste Plasterboard - Landfill tonnes 71.95000
Scope 3 Waste Plasterboard - Recycled tonnes 21.28081
Scope 3 Waste Plastics: average plastic film - Combustion tonnes 21.28081
Scope 3 Waste Plastics: average plastic film - Landfill tonnes 8.88413
Scope 3 Waste Plastics: average plastic film - Recycled tonnes 21.28081
Scope 3 Waste Plastics: average plastic rigid - Combustion tonnes 21.28081
Scope 3 Waste Plastics: average plastic rigid - Landfill tonnes 8.88413
Scope 3 Waste Plastics: average plastic rigid - Recycled tonnes 21.28081
Scope 3 Waste Plastics: average plastics - Combustion tonnes 21.28081
Scope 3 Waste Plastics: average plastics - Landfill tonnes 8.88413
Scope 3 Waste Plastics: average plastics - Recycled tonnes 21.28081
Scope 3 Waste Plastics: HDPE (incl. forming) - Combustion tonnes 21.28081
Scope 3 Waste Plastics: HDPE (incl. forming) - Landfill tonnes 8.88413
Scope 3 Waste Plastics: HDPE (incl. forming) - Recycled tonnes 21.28081
Scope 3 Waste Plastics: LDPE and LLDPE (incl. forming) - Combustion tonnes 21.28081
Scope 3 Waste Plastics: LDPE and LLDPE (incl. forming) - Landfill tonnes 8.88413

Page 26

Scope 3 Waste Plastics: LDPE and LLDPE (incl. forming) - Recycled tonnes 21.28081
Scope 3 Waste Plastics: PET (incl. forming) - Combustion tonnes 21.28081
Scope 3 Waste Plastics: PET (incl. forming) - Landfill tonnes 8.88413
Scope 3 Waste Plastics: PET (incl. forming) - Recycled tonnes 21.28081
Scope 3 Waste Plastics: PP (incl. forming) - Combustion tonnes 21.28081
Scope 3 Waste Plastics: PP (incl. forming) - Landfill tonnes 8.88413
Scope 3 Waste Plastics: PP (incl. forming) - Recycled tonnes 21.28081
Scope 3 Waste Plastics: PS (incl. forming) - Combustion tonnes 21.28081
Scope 3 Waste Plastics: PS (incl. forming) - Landfill tonnes 8.88413
Scope 3 Waste Plastics: PS (incl. forming) - Recycled tonnes 21.28081
Scope 3 Waste Plastics: PVC (incl. forming) - Combustion tonnes 21.28081
Scope 3 Waste Plastics: PVC (incl. forming) - Landfill tonnes 8.88413
Scope 3 Waste Plastics: PVC (incl. forming) - Recycled tonnes 21.28081
Scope 3 Waste Soils - Landfill tonnes 19.51734
Scope 3 Waste Soils - Recycled tonnes 0.98491
Scope 3 Waste Tyres - Recycled tonnes 21.28081
Scope 3 Waste WEEE - fridges and freezers - Landfill tonnes 8.88413
Scope 3 Waste WEEE - large - Combustion tonnes 21.28081
Scope 3 Waste WEEE - large - Landfill tonnes 8.88413
Scope 3 Waste WEEE - mixed - Combustion tonnes 21.28081
Scope 3 Waste WEEE - mixed - Landfill tonnes 8.88413
Scope 3 Waste WEEE - small - Combustion tonnes 21.28081
Scope 3 Waste WEEE - small - Landfill tonnes 8.88413
Scope 3 Waste Wood - Combustion tonnes 21.28081
Scope 3 Waste Wood - Composting tonnes 8.91242
Scope 3 Waste Wood - Landfill tonnes 925.24450
Scope 3 Waste Wood - Recycled tonnes 21.28081
Scope 3 Water Water supply cubic metres 0.10000
Scope 3 Water Water supply million litres 110.00000
Scope 3 Water Water treatment cubic metres 0.19000
Scope 3 Water Water treatment million litres 190.00000
END