Appendix 4 
Alyth Natural Flood Management Study (NFM) – Short List of Potential Options 
Optio
n ID Description
Total
Benefit 
(present
value)
Estimated
Capital Cost
Standard
of
Protection
(SoP)
No. of properties
protected to the
measure SOP
Benefit-
Cost 
Ratio
A Johnshill Burn culvert upgrades £837,381 £647,064 0.5% AEP 10* 1.19
B
Alyth Burn flood walls and Johnshill
Burn culvert upgrade £3,644,226 £5,855,524 0.5% AEP 106 0.61
C
Alyth Burn weir removal, Johnshill
Burn culvert upgrades and flood wall £3,407,015 £6,888,605 1% AEP 67 0.49
D Doctor's Burn channel upgrades £2,040,776 £800,161 1% AEP 40 2.25
E
Catchment wide NFM (excluding loch
upsizing) £412,827 £1,114,301 n/a 0 0.18 
*However, there is still a residual risk of flooding from the Alyth Burn.