Page 1

Appendix 1 
Blairgowrie & Rattray Surface Water Management Plan (SWMP) – Plans of
Short Listed Potential Options 
Option A  Surface water diversion (speed hump) at Upper Allan Street 
This was the top scoring option from the multi-criteria assessment.
It is a simple speed ramp, placed on Upper Allan Street. The
rationale behind this is to intercept overland flow that currently
causes some of the flood risk experienced in Blairgowrie town
centre and direct it into Cuttle Burn Den which will naturally enable
it to flow towards the River Ericht away from buildings in the town.
Figure 1 indicates on a map where this feature would be sited. 
Figure 1 – Surface water diversion (speed hump) at Upper Allan Street (Option A)

Page 2

Option B  Leaky Dams / Natural Flood Management on the Rattray Burn 
This option scored 2nd place in the multi-criteria assessment. The
rationale behind this is to hold water further up in the Rattray Burn
catchment releasing it slowly to keep it within the capacity of the
Rattray Burn channel for as long as possible thus reducing the
amount of time it spills out-of-bank towards the urban area of
Rattray. Figure 2 indicates on a map where these features could be
sited. 
Figure 2 – Surface water diversion (speed hump) at Upper Allan Street (Option B)

Page 3

Option C  Disconnection of the industrial area at Welton Road from the
combined sewer network 
This option scored 3rd place in the multi-criteria assessment. The
rationale behind this is to redirect surface water runoff out of the
combined sewer into an open pond to treat it prior to discharge into
the River Ericht. This increases the combined sewer capacity
upstream reducing the surface water flood risk in Blairgowrie town
centre. Figure 3 indicates on a map where this features could be
sited. 
Figure 3 – Disconnection of the industrial area at Welton Road from the combined sewer network (Option C)

Page 4

Option D  Construction of SuDS on Rattray Common 
This option scored 4th place in the multi-criteria assessment. The
rationale behind this is to direct excess flows from the Rattray Burn
and route them to a new SuDS facility in Rattray Common prior to
discharge to Loon Braes. A high volume of water is estimated to be
required for storage/attenuation but the storage for this can be split
between Rattray Common, Loon Braes and potentially to an
expanded SuDS facility at David Grimmond Place (subject to
agreeing use of land). Figure 4 indicates on a map where the
features could be sited. 
It is important to note that the proposals at feasibility study stage
are primarily to understand if the option is viable, and that the final
form of an intervention of this size can be a community driven
design and sometimes involves other aspects such as landscape
architecture and/or active travel routes depending on other local
aspirations. 
Figure 4 – Construction of SuDS on Rattray Common (Option D)

Page 5

Option E  Construction of a swale behind Burnhead Road 
This option scored 5th place in the multi-criteria assessment. The
rationale behind this is to collect overland flow in a small ditch from
steep fields behind Burnhead Road and direct it towards the Cuttle
Burn Den so it can then naturally flow into the River Ericht and away
from properties. Figure 5 indicates on a map where this option
could be sited. 
Figure 5 – Construction of a swale behind Burnhead Road (Option E)