APPENDIX 1 
LHEES/LAEP SHARED DELIVERY PLAN (2024-2029) 
ANNUAL PROGRESS UPDATE 
The tables below outline the progress made on each strategic priority since the LHEES and LAEP were published.  The
LHEES/LAEP Delivery Plan is more agile and iterative, to support the rapid decarbonisation that is required. The Delivery Plan is
considered a ‘live’ document and supported by digital platforms use of ‘live’ data and requiring ongoing stakeholder engagement to
ensure aligned investment and delivery with partners. (Note: L in the table below denotes an additional LAEP Action Crossover,
Target dates appear in brackets in Progress column) 
Risk Rating RAG Status in relation to approved target dates
High  Target likely to be missed
Medium Target date tight
Low On target 
Strategic Priority 1: Decarbonising heat within a transitioning energy system – 1A: Heat Networks 
ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
1.1  Evaluate delivery models for
deploying heat networks in Perth
and Kinross, including 
establishing a Strategic Energy
Partnership, and agree
development route.
• Engaged with Danish
Mentoring Programme,
Scottish Futures Trust, Zero
Waste Scotland, suppliers
and other Councils to
explore potential delivery
models for Perth City heat
networks and wider heat
networks.
ZWS, SFT,
Communities
Heat Network
Support Unit
(HNSU) Scottish
Government
funding
Started
Published a
Strategic Energy
Partner Request for
Information and
analysed
responses. 
Consulted with the
market and
stakeholders

Page 2

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
through a series of
workshops to
evaluate a possible
Strategic Energy
Partnership
(December 2024)
1.2 Explore feasibility of connecting
non-domestic and domestic
buildings to heat network by
progressing the requirements of
The Heat Networks (Heat Network
Zones and Building Assessment
Reports) (Scotland) Regulations
2023 following the LHEES
modelling (ie finalising Review
(Section 47) and preparing for
Designation (Section 48).
• Explore the suitability of
non-domestic buildings
within a heat network zone
to connect to a heat
network - linked to Council’s
Estate decarbonization
programme Power BI
dashboard.
Building owners
and estate
managers, SSEN,
SFT, ZWS
Heat Network
Support Unit
(HNSU) Scottish
Government
funding 
Not started –
Further policy
guidance to be
provided by
Scottish
Government - Q4
2024/Q1 2025 
(December 2024
TBC) 
1.3 Explore feasibility of connecting
residential housing to heat
networks
• Feasibility of connecting
residential areas in
proximity or between
Potential Zones and
potential impact of this with
fuel poverty and energy
savings.  
• Investigate suitability of
Council owned properties
within the Inveralmond and
North Muirton Industrial
Estates to connect to a heat
network.  
RSLs, HAs  Heat Network
Support Unit
(HNSU) Scottish
Government
funding 
Started – covered
under HNSU
project 
(December 2024)

Page 3

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG 
1.4 Assess financial viability of heat
network zones in relation to
buildings connected 
• Review viability of Selected
Potential Zones and verify
heat demand, supply and
zone boundaries. 
• Assess impact of secondary
school review on viability of
zones
SFT, ZWS, SG Heat Network
Support Unit
(HNSU) Scottish
Government
funding 
Started – covered
under HNSU
project 
(December 2024) 
1.5 Assess financial viability of Perth
City Centre Network
• Development of an Outline
Business Case for heat
network in the Perth City
Centre
HNSU, SFT Heat Network
Support Unit
(HNSU) Scottish
Government
funding 
Started – covered
under HNSU
project 
(December 2024) 
1.6 Complete Building Assessment
Reports 
(BARs) for required Council
owned building
• Complete BARs for Council
owned building prioritising
those with a higher
suitability for connection
and located within potential
Heat Network 
Zones. 
• Facilitate and support other
public sector organisations
across Perth and Kinross to
discharge this duty.
Public sector
organisations
Required, but
source not
identified  
Started -
BARS online form
developed by the
Improvement
Service awaiting
Scottish
Government
funding 
(December 2024)

Page 4

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG 
1.7 Explore and quantify viability of
low carbon or renewable heat
sources for potential heat
networks including though not
limited to:
• Deep geothermal
• Heat from wastewater treatment
plants/wastewater 
network
• Ground Source heat pumps 
• Other sources of waste heat
• Work with stakeholders,
including Scottish Water
Horizons, Waste Heat
Steering Group etc., to
quantify the renewable or
low carbon heat
opportunities to support the
designation of heat
networks zones and inform
development of feasibility
studies and business cases
for Potential Heat Network
Zones 
Scottish
Government,
Scottish Water
Horizons, SEPA
Heat Network
Support Unit
(HNSU) Scottish
Government
funding 
Started – covered
under HNSU
project 
(December 2024) 
1.8 Work with business support
organisations to engage the non-
domestic sector to develop
awareness and engagement
campaigns, and identification and
engagement with non-domestic
building owners on suitability for
heat networks, within Potential
Zones. 
• Support a local business
programme that provides
practical support to
business owners.
• Use information generated
as part of dedicated
engagement plan for the
non-domestic sector to
inform this
Business Energy
Scotland, Perth
Chamber of
Commerce, FSB,
Business Gateway
Required, but
source not
identified  
Not started – 
(December 2025 
1.9 Engage with Historic Environment
Scotland and SSEN to assess
considerations impacting viability
of heat networks
• Engage with Historic
Environment Scotland to
understand implications that
conservation area status
might have on heat network
development. 
• Engage with SSEN on the
impact of the proposed heat
network on electricity
infrastructure, and potential
capacity for expansion of
the proposed heat network. 
Historic
Environment
Scotland (HES),
SSEN
N/A Started - exploring
Fife Pilot to improve
granularity of HES
data 
(December 2024)

Page 5

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG 
1.10
L1.1
Explore expansion and
boundaries of potential heat
network zones in the Perth City
Centre 
• Explore long-term potential
for interconnection with
Perth HMP, Perth Royal
Infirmary, Perth College
UHI, Perth Grammar
School, nearby residential
estates and through
connecting the heat
network to planned
redevelopment of the bus
and railway station, Perth
Leisure Centre and Dewars
Centre. 
• Further analysis of viability
and potential socio-
economic impacts of
connecting Letham to a
heat network (Zone 7). 
HMP, PRI, Perth
College UHI, Perth
Grammar, Perth
Leisure Active.
HNSU, SFT
Heat Network
Support Unit
(HNSU) Scottish
Government
funding 
Started – covered
under HNSU
project. Further
policy guidance to
be published by the
Scottish
Government – Q4
2024/Q1 2025. 
(June 2025) 
1.11
L1.1
Explore expansion and viability of
potential heat network boundaries
in Auchterarder, Kinross and
Blairgowrie. 
• Assess the suitability for
nearby housing stock for
connection to a heat
network.  
• Consider potential for
connecting to heat networks
at early stages of site
development for future
housing and employment
sites.
Housing
Association, RSLs,
Strategic Housing
Forum
Required, but
source not
identified  
Not Started -
Further policy
guidance to be
provided by
Scottish
Government – Q4
2024/Q1 2025 
(June 2025)

Page 6

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG 
1.12 Explore expansion and viability of
potential heat network boundaries
in Kinross.
• Engage with local
community in Kinross and
CATCH around appetite for
connection of domestic
properties to heat network.
• Conduct a deeper dive of
suitability for housing stock
in proximity to Loch Leven
Leisure Centre for
connection to a heat
network (Zone 5).
CATCH, Housing
Association, RSLs,
Strategic Housing
Forum 
Required, but
source not
identified  
Not Started -
Further policy
guidance to be
provided by
Scottish
Government on
Heat Network
Zoning – Q4
2024/Q1 2025. 
(June 2025)  
1.13 Explore expansion and viability of
potential heat network boundaries
in Blairgowrie.
• Explore opportunity for a
heat network connecting
Blairgowrie Campus,
including connecting to
residential area between
the anchor loads, noting
that low heat demand and
low number of social
housing (Zone 4). 
• Engage with HEAT project
and Proctor Production
Facilities to understand
existing project, appetite for
connection to a heat
network and potential for
waste heat opportunity from
the site.
HEAT project,
Proctor Production
Facilities. Housing
Association, RSLs,
Strategic Housing
Forum 
Required, but
source not
identified  
Not Started -
Further policy
guidance to be
provided by
Scottish
Government on
Heat Network
Zoning – Q4
2024/Q1 2025. 
(June 2025)  
1.14  Explore expansion and viability of
potential heat network boundaries
in Auchterarder.
• Explore feasibility of
connecting residential areas
in proximity to Auchterarder
Community School (Zone 6) 
Communities,
Housing developers
Housing
Association, RSLs,
Required, but
source not
identified  
Not Started -
Further policy
guidance to be
provided by
Scottish

Page 7

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
Strategic Housing
Forum
, 
Government on
Heat Network
Zoning – Q4
2024/Q1 2025. 
(June 2025)

Page 8

Strategic Priority 1: Decarbonising heat within a transitioning energy system – 1B: Heat Pumps
ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
L2.1 Launch campaign to encourage and
educate businesses, homeowners,
private landlords, and tenants (where
applicable) to install heat pumps and
other low carbon heating solutions.
• Develop resources to share
in residential areas with
high heat pump suitability.
This could be combined
with campaigns around
energy efficiency measures
and renewables to provide
a whole system campaign.
SGov, Housing
Association, RSLs,
Strategic Housing
Forum Community
groups and other
institutional
landowners and
businesses
Green Heat
Innovation Support
Fund, Home
Energy Scotland
Grant, Council
Green Business
Grants Social
Housing Net Zero
Heat Fund
EES:ABS
PKC, Housing
Associations
IUK Social Retrofit
and Rural
Transport
Started Innovate
UK Revitalising
Homes Project
including the One
Stop Shop (OSS) 
in progress. 
(December 2024)
1.15
L2.3
Target social housing with immediate
potential for heat pump retrofit in line
with LHEES delivery plan
• Heat pump retrofit plan
developed within the
Council’s social housing
stock, targeting properties
first with inefficient, carbon
intensive systems (e.g.,
LPG and Oil).
• Direct funding and advice
for retrofit through
EES:ABS and wider funding
sources into Delivery Areas
identified within the LHEES.
Collaborate with housing
associations to encourage
Housing
Association, RSLs,
Strategic Housing
Forum. Heat Pump
Installers
Social Housing Net
Zero Heat Fund
EES:ABS
PKC, Housing
Associations
IUK Social Retrofit
and Rural
Transport
Started 
Innovate UK
Revitalising Homes
Project including
the One Stop Shop
(OSS) in progress.
Developing a
strategic Council
decarbonisation
programme across
the Council’s
building stock.

Page 9

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
heat pump installations.  Continue to deliver
measures under
EES:ABS
(December 2024)
1.16 Work with key delivery partners to
target privately owned, off gas grid
properties suitable for heat pump
retrofit 
• Collaborating with local
energy groups (e.g. HEAT
Project) to engage with
residents by providing
informative materials to
promote the benefits of heat
pumps and promote
existing funding options.
• Prioritise working with
private landlords that own
large portfolios to
decarbonise to their
housing stock. 
• Develop awareness
campaigns to educate
property owners about heat
pumps, installation, and
funding.
Housing
Associations, RSLs,
Strategic Housing
Forum,
Communities,
HEAT projects 
EES:ABS  Continue to deliver
measures under
EES:ABS for
private properties
adjacent to targeted
social housing 
(December 2027)
1.17 Work with key delivery partners to
target off-gas private homes that
require energy efficiency
improvements to enable suitability for
heat pumps 
• Collaborating with local
energy groups (e.g. HEAT
Project) to engage with
residents by providing
informative materials to
promote the benefits of heat
pumps and promote
existing funding options. 
• Prioritise working with
private landlords that own
Housing
Associations, RSLs,
Strategic Housing
Forum,
Communities,
HEAT projects
EES:ABS  Continue to deliver
measures under
EES:ABS for
private properties
adjacent to targeted
social housing 
(December 2027)

Page 10

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
large portfolios to
decarbonise to their
housing stock. 
• Develop awareness
campaigns to educate
property owners about heat
pumps, installation, and
funding.
1.18 Work with key delivery partners to
target privately owned non-domestic
properties suitable for heat pump and
retrofit
• Continued engagement with
the private sector, to
identify barriers associated
with building retrofit to
provide tailored solutions
aimed at addressing the
specific challenges.
• Work with Business Energy
Scotland to engage the
non-domestic sector to
develop awareness and
engagement campaigns,
and identification and
engagement with non-
domestic building owners. 
• Promote awareness of
funding incentives available
for small and medium-sized
enterprises (SMEs)
Communities,
HEAT projects,
Businesses
NA Not Started
(December 2027) 
1.19
L2.2 
Work with SSEN to align investment
planning and grid reinforcement to
support heat  pumps and heat
networks.
• Use RESOP and LENZA
platform to collate and
share data and feed into
SSEN investment plan
SSEN Ofgem funding Started - LHEES
and LAEP data
published to
LENZA platform.
(December 2024)

Page 11

Strategic Priority 2: Improving buildings’ energy efficiency aiming for affordable warmth and regulatory compliance. 
2A - Improving buildings’ energy efficiency to meet regulatory standards
ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
2.1 Target social housing and privately
owned homes with energy efficiency
requirements to meet regulatory
standards
• Prioritise social housing
with poor energy
efficiency but relatively
low intervention costs for
"quick wins.” 
• Prioritise areas with
substantial energy
savings and CO2
emissions reductions
potential at a lowest cost. 
• Collaborate with partners
and Scottish Government
to incentivise improving
energy efficiency in
privately owned homes.  
• Direct funding and advice
for retrofit through
EES:ABS and wider
funding sources into
Delivery Areas 
identified within the
LHEES.
Housing
Association, RSLs,
Strategic Housing
Forum, Scottish
Government
EES:ABS
Private
PKC IUK Social
Housing Retrofit
and Rural
Transport
Continue to deliver
measures under
EES:ABS for
private properties
adjacent to targeted
social housing 
(December 2025)

Page 12

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
2.2  Work with delivery partners to target
non-domestic buildings that require
retrofit to meet regulatory targets 
• Facilitate collaboration
between the public and
private sectors and align
strategic energy planning
potentially through
Strategic Energy
Partnership. 
• Promote awareness of
funding incentives
available for small and
medium-sized 
enterprises (SMEs) 
• Continued engagement
with the private sector, to
identify barriers
associated with building
retrofit to provide tailored
solutions aimed at
addressing the specific
challenges. 
• Work with Business
Energy Scotland to
engage the non-domestic
sector to develop 
awareness and
engagement campaigns,
and identification and
engagement with non-
domestic building owners.
Business Energy
Scotland, Public
sector non
domestic
Private  Not Started
(December 2025)

Page 13

2B - Improve buildings’ energy efficiency aiming for affordable warmth
ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
L1.5 Rollout programme for energy efficiency
retrofit of council buildings, housing
stock, and other non-domestic buildings
(e.g. schools)
• Strategic Council
Decarbonisation planning
undertaken across the
Council’s building stock
aligning with the LHEES
delivery plan. 
• Smart energy systems
could also be considered
as part of programme.
N/A PKC Started 
Technical
consultants draft
report delivered
July 2024
(December 2028)
L1.6 Report levels of EPC improvement
publicly
• Publicly report progress in
improving privately rented
domestic and commercial
buildings.
Property owners,
Housing
Associations, RSLs
NA Not Started
(December 2025)
2.3  Target delivery areas for social housing
that does not meet regulations (e.g.,
below EPC B) identified for energy
efficiency retrofit   
• Prioritise social housing
likely to experience a
greater reduction in fuel
poor households due to
the implementation of
low-cost retrofit
measures.
Housing
Association
RSLs
Required, but
source not
identified
Not Started -
(December 2025)
2.4 Target delivery areas for privately
owned homes that do not meet targets
(e.g., below EPC C) and potential
suitability for EEPS:ABS funding 
• Promote retrofitting in
targeted areas though
awareness campaigns
about available funding to
support fuel-poor
households. 
• Direct funding and advice
for retrofit through
EES:ABS and wider
funding sources into
Delivery Areas 
identified within the
LHEES
Communities,
HEAT projects
EES:ABS Not Started
(December 2025)

Page 14

ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
2.5 Target privately owned properties below
EPC band E 
• Promote retrofitting in
targeted areas though
awareness campaigns
about available funding to
support fuel-poor
households. Direct
funding and advice for
retrofit through EES:ABS
and wider funding
sources into Delivery
Areas 
identified within the
LHEES
Communities,
HEAT projects,
Businesses
EES:ABS Not Started
(December 2025)

Page 15

Strategic Priority 3 - Reduce Transport Demand
ID ACTION SUMMARY  STAKEHOLDER  FUNDING PROGRESS 
& RAG
L3.1 Review and finalise Perth and Kinross’s
Mobility Strategy
• Finalise the Council’s
draft mobility strategy to
align with the outcomes
presented in this LAEP
explore opportunities to
enhance stakeholder
collaboration, address
potential barriers, and
ensure effective
implementation.
Tactran, public
transport
providers
N/A Started 
Produced the Draft
Mobility Strategy
and Action Plan
which was
approved for
consultation by the
Climate Change
and Sustainability
Committee 
(October 2024).  
L3.2 Investigate the use of multi-modal
transport hubs and inner-city car parking
restrictions to increase public transport
usage
• Development of multi-
modal transport hubs
such as ‘Park & Ride’
systems, which
encourage parking
outside of congested
areas and travelling in via
public transport. Urban
area car parking
restrictions, preventing
long-stays, would further
encourage multimodal
travel, including cycling.
Stagecoach, other
transport providers
Perth Theatre and
Concert Hall and
Creative Carbon
Scotland
Cycling Friendly
programme, EST e-
bike grant and
loans, Network
Support Grant,
Community Bus
Fund scheme,
Smarter Choices,
Smarter Places
funding
Started 
Perth Theatre and
Concert Hall report
recommendations
as part of the
Transforming
Audience Travel
Through Art
(TATTA) project
Requirement to
align the actions
within the Council’s
Mobility and Action
Plan and LHEES
and LAEP
Strategies and
Shared Action Plan

Page 16

Target date to be
set with Mobility
Delivery Plan
L3.3 Investigate improvements in last mile
delivery logistics within Perth to reduce
emissions.
• Collaborate with local
delivery partners on how
last mile delivery in Perth
can increase efficiency to
reduce emissions
Delivery companies
operating in
Perth and Kinross
N/A Not Started
Requirement to
align the actions
within the Council’s
Mobility and Action
Plan and LHEES
and LAEP
Strategies and
Shared Action Plan
to ensure effective
and joined up
delivery of actions
across the Council
and our Delivery
Partners
Target date to be
set with Mobility
Delivery Plan

Page 17

L3.4 Encourage the uptake of home-working
/ coworking spaces to reduce transport
demand
• Continue to support
schemes for
hybrid/homeworking
equipment to encourage
working from home when
appropriate. 
• Council-owned spaces
can be used as local co-
working spaces for free,
to reduce transport
demands, especially at
rush-hour.
TACTRAN N/A Not Started
Requirement to
align the actions
within the Council’s
Mobility and Action
Plan and LHEES
and LAEP
Strategies and
Shared Action Plan
to ensure effective
and joined up
delivery of actions
across the Council
and our Delivery
Partners Target
date to be set with
Mobility Delivery
Plan 
L3.5 Encourage active travel through public
campaign and facilitation of electric bike
hire schemes.
• Encourage active travel
through the promotion of
health/environmental
benefits. Introduce
electric bike/scooter
schemes where they can
be loaned or hired for
both short-term or long-
term, especially in rural
areas. 
• Potential to introduce
grants/interest-free loans
for low-income
households 
N/A N/A Not Started
Requirement to
align the actions
within the Council’s
Mobility and Action
Plan and LHEES
and LAEP
Strategies and
Shared Action Plan
to ensure effective
and joined up
delivery of actions
across the Council
and our Delivery
Partners Target

Page 18

date to be set with
Mobility Delivery
Plan
L3.6 Establish a Future Transport Advisory
Board to monitor data on active travel
and private car use against targets.
• Develop a Future
Transport Advisory Board
to monitor the rates of
active travel and trends of
private car use, in order to
ensure progress is being
made towards the set
target and identify
problem areas
TACTRAN N/A Not Started
Requirement to
align the actions
within the Council’s
Mobility and Action
Plan and LHEES
and LAEP
Strategies and
Shared Action Plan
to ensure effective
and joined up
delivery of actions
across the Council
and our Delivery
Partners Target
date to be set with
Mobility Delivery
Plan

Page 19

Strategic Priority 4 – Decarbonise Transport
ID ACTION SUMMARY  STAKEHOLDERS FUNDING PROGRESS 
& RAG
L4.1 Explore the potential for all buses to be
EVs and encourage uptake via
specialised services for specific groups
• Collaborate with local
transport companies such
as Stagecoach to ensure
all buses are electrified.
• Investigate the curation of
specialised, cost-effective
services e.g. for students,
key workers etc. to
provide a reliable service
and increase public
transport uptake/reduce
reliance on cars.
Stagecoach (+
other bus
companies),
schools, NHS)
Scottish zero
emission bus
challenge fund
Started 
Stagecoach has
introduced EV fleet
in Perth City
(December 2027)
L4.2 Investigate the use of cargo bikes within
Perth to reduce emissions
• Collaborate with local
delivery partners and
explore the possibility of
using cargo bikes for
moving goods locally.
Local Delivery
Companies
N/A Not Started
Requirement to
align the actions
within the Council’s
Mobility and Action
Plan and LHEES
and LAEP
Strategies and
Shared Action Plan
to ensure effective
and joined up
delivery of actions
across the Council
and our Delivery
Partners Target
date to be set with
Mobility Delivery
Plan

Page 20

L4.3 Explore increasing the number of rapid
EV charging stations
• Encourage the uptake of
EVs via increasing the
number of on-street
changing stations.
Transport Scotland,
The Office for Low
Emission Vehicles
and Energy
Savings Trust
The OZEV EV
Domestic
Chargepoint Grant,
EST Domestic
Chargepoint Grant,
Used Electric
Vehicle Loan,
Business
chargepoint funding 
Continue to install
publicly accessible
chargers.  
(December 2029)
L4.4 Explore opportunities for the use of
hydrogen in HGVs
• Collaborate with Binn
Ecopark to investigate
opportunities to fuel the
Council’s refuse lorries
with green hydrogen. 
• Utilise the findings to
determine the feasibility of
fuelling more of public
sector HGV fleets with
green hydrogen. 
The Binn Group £50 million 10-year
Energy from Waste
contract with Binn
Ltd in June 2023
Started 
Feasibility stage
(December 2029) 
L4.5 Ultra Low Emission Zones (ULEZ)
Policy roll-out
• Investigate the roll-out of
ULEZ policy in urban
areas, to reduce
congestions of cars within
high demand areas and
increase public transport
uptake. 
• Utilise the findings of
TACTRAN Regional
Transport Strategy 2024-
2034, which provides a
regional target of ULEV
achieving 72.2% of the
56% CO2
Public transport
providers,
TACTRAN
N/A Not Started
Requirement to
align the actions
within the Council’s
Mobility and Action
Plan and LHEES
and LAEP
Strategies and
Shared Action Plan
to ensure effective
and joined up
delivery of actions

Page 21

across the Council
and our Delivery
Partners Target
date to be set with
Mobility Delivery
Plan

Page 22

Strategic Priority 5 – Deploy Local Renewable Generation
ID ACTION SUMMARY STAKEHOLDERS FUNDING PROGRESS 
& RAG
L5.1 Stimulate and support the local supply
chain to facilitate installation and
maintenance of local renewable energy
generation.
• Collaborate with local
colleges to establish a
targeted skills programme
dedicated to renewable
energy generation. 
• Council should continue to
invest in current staff,
retraining them to have the
required skillset. 
Renewable
energy
installation
companies,
developers and
manufacturers.
Efficiency Business
Support
Service, Smart
Export Guarantee
(SEG), PPA
Started  
Mapping out
provision and
demand
Regional Skills
Investment Plan
updated and
progressed Tay
City Deal (TCD)
Digital Skills
Strategic Outline
Case 2026 – 2030   
L5.2 Advocate for a One-Stop-Shop (OSS)
scheme for Rooftop PV and other
renewables
• Emphasise to Scottish
Government the significance
of centralising installation
information and issuing
through a reliable authority. 
• OSS can serve as a
valuable resource for
information on energy
efficiency and heat
decarbonisation,
encouraging a holistic
approach to whole house
retrofit solutions
N/A IUK Social Housing
Retrofit and Rural
Transport 
Started 
Innovate UK
Revitalising Homes
Project including
the One Stop Shop
(OSS)  in progress.
(March 2025)

Page 23

L5.3 Reassess potential suitability for
renewables.
• Identify locations suitable for
onshore wind,
hydroelectricity, and PV
installations differentiating
between public and private
land ownership to determine
the most viable deployment
approach. 
• Investigate opportunities for
co-locating generation
assets with battery storage.  
• Action aligned to NPF4
Policy 11 requirements. 
Renewable
energy
developers
NA Started 
Produced a
consultation Topic
Paper on Energy,
Heat and Cooling
as part of the LDP
Evidence Report 
(Aligned to LDP3
timescales) 
L5.4 Engage regularly with Scottish and
Southern Electricity Networks (SSEN).
• Share LAEP plan through
the LENZA to evidence base
for network reinforcement.
SSEN Ofgem Started
Worked with SSEN
to publish LHEES
and LAEP evidence
and develop a road
map for the
LENZA platform
used to plan and
coordinate retrofit
and roll out of low
carbon
technologies 
(Ongoing)

Page 24

L5.5 Launch a campaign to encourage and
educate businesses, homeowners,
private landlords, and tenants (where
applicable) to install rooftop PV.
• Collaborate with local
community groups to
organize workshops. 
• Refer landlords and
residents to key available
funding schemes. 
• Leverage insights from the
assessment conducted on
rooftop suitability for solar
PV, derived from the
outcomes of Action 5.3. 
• Promote the resources
available on the Council’s
Climate Action website.
Community
Energy Groups
Required, but
source not
identified 
Not Started 
(2027)
5.6 Support community energy schemes • Collaborate with Community
Energy Scotland to identify
potential local community
energy projects. 
Community
Energy Scotland
and other local
community
energy groups,
SSEN, BABLE,
CATCH
Scalable Cities EU
funding
Started
Scalable Cities
project to explore
how to involve
communities in
local energy
generation and
heat
decarbonisation as
part of a strategic
approach to
building a local and
decentralised
energy system   
(March 2025)