Agenda Document Pack - Audit and Risk Committee - 21/09/2026

Perth and Kinross Council · 21 September 2026
Back to Audit and Risk Committee — 21 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
15/09/2026 
A hybrid meeting of the Audit and Risk Committee will be held in the Council
Chamber on Monday, 21 September 2026 at 13:00. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor David Illingworth (Convener)
Councillor Bob Brawn (Vice-Convener)
Councillor Liz Barrett
Councillor Andy Chan
Councillor Ken Harvey
Councillor Iain MacPherson
Councillor Grant Stewart
Page 1 of 92

Page 2

Page 2 of 92

Page 3

Audit and Risk Committee 
Monday, 21 September 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF AUDIT AND RISK COMMITTEE OF 29
JUNE 2026 FOR APPROVAL
(copy herwith) 
5 - 14 
4 INTERNAL AUDIT FOLLOW UP
Report by Chief Internal Auditor (copy herewith 26/253) 
15 - 18 
5 INTERNAL AUDIT UPDATE
Report by Chief Internal Auditor (copy herewith 26/254) 
19 - 22 
6 INTERNAL AUDIT - 25-11 ASSESSMENT AND CHARGING
(copy herewith 26/255) 
23 - 32 
7 INTERNAL AUDIT - 25-10 PAYROLL - ADDITIONAL PAYMENTS
(copy herewith 26/256) 
33 - 86 
8 NATIONAL FRAUD INITIATIVE OUTCOMES 2025/26 AND
PREPARATIONS 2026/27
Report by Chief Internal Auditor (copy herewith 26/257) 
87 - 92 
Page 3 of 92

Page 4

Page 4 of 92

Page 5

Audit and Risk Committee 
Minute of hybrid meeting of the Audit and Risk Committee held in the Council
Chambers on Monday 29 June 2026 at 1.00pm. 
Present: Councillors D Illingworth, B Brawn, L Barrett, M Frampton (substituting for K
Harvey), G Laing (substituting for A Chan), I MacPherson and G Stewart. 
In Attendance: L Simpson, Strategic Lead – Legal and Governance; S Walker,
Strategic Lead – Finance and Business Support; A O’Brien, J Sailsbury and G
Walker (Finance and Business Support); P Johnstone and L Hamilton (Strategic
Planning, People and Performance), N Lennon (Housing and Communities); S
Thompson (Health and Social Care Partnership); J Clark, K Molley, E Ferguson and
M Pasternak (all Legal and Governance). 
Also in Attendance: P Bryan (Audit Scotland). 
Apologies: Councillors A Chan and K Harvey 
Councillor D Illingworth, Convener, Presiding. 
1. Welcome and Apologies/Substitutions 
The Convener welcomed everyone to the meeting and apologies and
substitutes were noted as above. 
2. Declarations of Interest 
There were no declarations of interest made in terms of the Councillors’ Code
of Conduct. 
3. Minute of Meeting of the Audit and Risk Committee of 23 March 2026 for
Approval 
The minute of meeting of the Audit and Risk Committee of 23 March 2026
was submitted and approved as a correct record apart from a typo under item 6.
25-09 - Petty Cash where the sentence to be corrected to ‘consolidation of
finance’. 
4. Outstanding Business Statement 
Resolved: 
(i) The contents of the Outstanding Business Statement, be noted. 
(ii) It be agreed that completed actions would be removed from the Outstanding
Business Statement. 
3
Page 5 of 92

Page 6

5. Unaudited 2025/26 Annual Accounts (Draft) 
There was submitted a report by Chief Finance Officer (26/190) presenting the
Council’s unaudited 2025/26 Annual Accounts (draft) in accordance with the Local
Authority Accounts (Scotland) Regulations 2014. 
Councillor G Laing queried how confident the Chief Finance Officer was that
Audit Scotland would produce the audited accounts by 30 November 2026. S Walker
confirmed that the Council have had positive conversations with Audit Scotland and
that they are on track to deliver the accounts by 30 November. S Walker added that
they are hoping to be able to bring the accounts even earlier for consideration,
however, do not want to make any commitment at this stage.   
In response to a question from Councillor G Stewart regarding support to the
Proper Officer, S Walker referred to a recent publication by CIPFA which set out
what the Chief Finance Officer should expect in terms of being able to deliver a
professional finance team that are competent and capable to produce the
information required by the Council. S Walker highlighted the positive work being
carried out by the finance team in Perth and Kinross Council, including the work to
deliver the unaudited accounts to Audit Scotland on time. S Walker confirmed that he
was comfortable with the abilities of the finance team but advised there are
opportunities for him to raise any issues with Elected Members or Senior Officers if
he felt that it was necessary. In response to a supplementary question from
Councillor G Stewart regarding resilience, S Walker advised that there are several
young people going through CIFPA courses to gain qualifications and confirmed that
the Council are in a better position over recent years in relation to succession
planning.   
Councillor B Brawn queried how confident the Chief Finance Officer was that
Audit Scotland would concur with his view that the Council is fit for purpose. S
Walker expressed that he was very confident that the Council would receive a clean
audit certificate. S Walker added that officers have regular conversations with Audit
Scotland around any issues or matters arising and confirmed that work was being
carried out with Audit Scotland all year round. In response to a supplementary
question from Councillor B Brawn, S Walker confirmed that the Council does have
financial challenges ahead. S Walker advised that he was confident that the
organisation would continue to deliver essential services, however, those services
may need to be delivered differently. S Walker added that the Strategic and
Executive Leadership teams are starting to look at the budget setting process for
2027/28 to see what can be brought forward, which would then be reported through
the budget review groups. 
Councillor G Laing quired if the Council are looking to set aside more to
maintain and improve the Council’s capital assets, S Walker advised that as part of
the budget process, money had been invested into bridges and roads, however there
would not be enough finance due to the size of Perth and Kinross. S Walker added
that teams involved are applying a risk-based approach and continue to monitor
sites, especially throughout bad weather events.  S Walker confirmed that through
conversations at the Corporate Investment Group and the Asset Management
Page 6 of 92

Page 7

Group, colleagues are doing what they can to keep on top of the Council’s key
assets. 
Members thanked the finance team for their work in preparing the draft
accounts and highlighted that the narratives in the management commentary are
more user friendly. 
Resolved:
(i) The Chief Finance Officer, be authorised to sign the unaudited 2025/26
Annual Accounts. 
(ii) It be noted that it is anticipated that the unsigned audited 2025/26 Annual
Accounts will be considered by the Audit & Risk Committee on 30 November
2026. 
6. Perth and Kinross Council Best Value Thematic Work – Asset
Management 
There was submitted a report by Audit Scotland (26/191) (1) setting out the
findings and four recommendations for improvement contained in the Perth &
Kinross Council Best Value Thematic Work on Asset Management; and (2) providing
a response and details actions that will be progressed in respect of the
recommendations. 
P Bryan, Audit Scotland, provided a summary of the report. 
Councillor L Barrett referred to the first key message that states the Council’s
asset challenge process provides a good model to inform decision making, however,
data to fully implement the process for property assets is lacking, limiting its
effectiveness and queried how the issue would be addressed. S Walker confirmed
that the Council does hold a lot of data, but that data was not currently held for all
assets. G Walker added that the key message was referring to utilisation data which
the Council currently holds for Perth and Kinross school estate. G Walker confirmed
that once an area of review had been undertaken, the utilisation data would be
captured for assets at that time.   
Councillor G Laing queried the definition of capital project and asked if it be
due to a project being over a certain numerical value or due to strategic importance
in a specific area of Perth and Kinross. P Bryan confirmed that there was not a clear
definition in place and that Audit Scotland are working with the Council on criteria. S
Walker added that officers have assessed projects which they think Elected
Members would be interested in, which could be a mixture of high and low monetary
values. S Walker added that words would be included in the next capital monitoring
report to the Finance and Resources Committee to say that projects would continue
to be assessed on an individual basis. 
In response to a question from the Convener regarding the four
recommendations of the report, P Bryan confirmed that the recommendations are
largely administrative points but advised that the most significant one to address
Page 7 of 92

Page 8

would be recommendation two as this would be a larger piece of work for the Council
in terms of creating the performance measures and being clear on what and how
often information should be reported. P Bryan confirmed that overall the report was
positive and that the recommendations outlined are more suggestions going forward
to ensure that good practice remains in place. 
Members thanked officers and Audit Scotland for the positive report. 
Resolved: 
The Contents of Audit Scotland’s Best Value Thematic Work, be noted. 
7. Internal Audit Follow Up 
There was submitted a report by Chief Internal Auditor (26/192) presenting
current summary of Internal Audit’s ‘follow up’ work relating to actions due for
completion up to April 2026. 
Councillor L Barrett referred to the actions on business continuity plans and
queried how confident the Chief Internal Auditor was that the next set of deadlines
would be achieved. J Clark confirmed that for the remaining two BCPs, one service
are currently awaiting a test on their BCP to take place and in the other service,
there are significant areas which have their own standalone business continuity
arrangements which are regularly being tested, however, the information had not yet
been consolidated into one plan for that strategic area. J Clark added that she had
been advised that the actions would meet the September deadline. 
Resolved: 
The current position in respect of the agreed actions arising from Internal
Audit’s work, be noted. 
8. Internal Audit Update 
There was submitted a report by Chief Internal Auditor (26/193) presenting a
summary of Internal Audit’s work undertaken as part of the Internal Audit Plans for
2024/25 and 2025/26. 
Resolved:
The progress with Internal Audit activity, be noted. 
9. Internal Audit – 25-04 Health and Safety 
There was submitted a report by Chief Internal Auditor (26/194) presenting an
audit undertaken on Health and Safety as part of the Internal Audit Plan for 2025-26,
which was approved by the Audit & Risk Committee in June 2025. 
Page 8 of 92

Page 9

Councillor G Laing asked for further information about the role of the health
and safety team. L Hamilton confirmed that the health and safety team sits in People
and Culture Services within the Council, and the role of the team would be to support
managers in discharging their responsibilities. L Hamiton added that in areas such as
Friarton or housing repairs, there are many staff with higher risk activities. L Hamilton
added that someone from the health and safety team works closely with the senior
managers in those areas to provide support in terms of health and safety.  L Hamiton
advised the Council does not use external consultants for health and safety. 
Councillor L Barrett raised concerns over the 23 actions detailed in the audit
and queried if the timescales in the management plan are sufficiently robust to address
the risk and if the deadlines would be achieved. P Johnstone confirmed that
management are responsible for health and safety in their own area of work, for
ensuring robust risk assessments and safe systems of work are in place and that staff
that are undertaking certain activities have been fully trained. P Johnstone added that
conversations had been held with internal audit and services in preparation of the
report and advised that she felt the timescales included were realistic and meet with
the risk level placed against them.  Councillor L Barrett asked if members concern
could be passed to services given the seriousness with some of the actions. 
Members thanked J Clark, her team and other relevant officers for their work
on the audit. 
Resolved:
The contents of Report 26/194, be noted. 
10. Internal Audit – 25-07 Insurance 
There was submitted a report by Chief Internal Auditor (26/195) presenting an
audit undertaken on Perth and Kinross Insurance as part of the Internal Audit Plan
for 2025-26, which was approved by the Audit & Risk Committee in June 2025. 
Members thanked J Clark, her team and other relevant officers for their work
on the audit. 
Resolved:
The contents of Report 26/195, be noted. 
11. Internal Audit – 24-04 Affordable Housing 
There was submitted a report by Chief Internal Auditor (26/196) presenting an
audit undertaken on Perth and Kinross Affordable Housing as part of the Internal
Audit Plan for 2024-25, which was approved by the Audit & Risk Committee in June
2024. 
Councillor G Stewart referred to the relationship between the property team and
the paralegals and queried if shared access had been put in place for buybacks to
enhance efficiency and communication, instead of having standalone records. N
Page 9 of 92

Page 10

Lennon advised that two record keeping systems were still in place, however,
confirmed that the paralegals now have access to the documentation raised by the
buyback officer. N Lennon added that there has been agreement to meet twice a year
to raise any issues. 
In response to a question from the Vice-Convener regarding the nature of the
audit, J Clark confirmed that the audit was undertaken on the delivery of affordable
housing provision and that a specific reference to buybacks had been included due to
the high numbers that had exceeded annual targets. J Clark confirmed that across the
board the arrangements are satisfactory, however, the actions have been put in place
so the Chief Internal Auditor can be able to place substantial assurance over the
Council’s achievements on affordable housing. 
In response to a question from the Convener, J Clark confirmed that good
progress has been made and anticipated that she would be able to place substantial
assurance once all actions are completed. 
Members thanked J Clark, her team and other relevant officers for their work
on the audit. 
Resolved:
The contents of Report 26/196, be noted. 
12. Internal Audit Annual Report & Internal Audit Opinion 2025/26 
There was submitted a report by Chief Internal Auditor (26/197) presenting the
year-end report and audit opinion of the Chief Internal Auditor for 2025/26. 
In response to a question from Councillor G Laing regarding the Global
Internal Audit Standards, J Clark advised that with the new standards there had been
little difference shown in the way that internal audit carry out their audits, however,
confirmed that the GIAS have created greater emphasis on the governance around
internal audit and the requirements for evidencing. 
The Vice-Convener referred to whistleblowing and queried if internal audit
receives many requests through the email or telephone line from employees with
concerns at work. J Clark confirmed that internal audit does not receive many
requests through the helpline which was positive. J Clark added that for issues to
reach this level, it would imply there had been a failing or breakdown in
communication earlier in the process. An employee should be able to raise a
concern with their line manager or Strategic Lead, and the issue should be
sufficiently dealt with at that point. 
Resolved:
The contents of this report, be noted, specifically the conclusion of the Chief
Internal Auditor, which states that reasonable reliance can be placed on the
Council’s risk management and governance arrangements, and systems of
internal control for 2025/26. 
Page 10 of 92

Page 11

13. Internal Audit Mandate & Charter 
There was submitted a report by Chief Internal Auditor (26/198) presenting
Internal Audit’s Mandate and Charter, in accordance with the Global Internal Audit
Standards in the UK Public Sector (GIAS (UKPS)). 
Resolved:
The Internal Audit Mandate & Charter which is aligned to the requirements of
the Global Internal Audit Standards (GIAS) and their application in the UK
Public Sector and the CIPFA Code of Practice for the Governance of Internal
Audit in Local Government, be approved and it be confirmed it accurately
reflects their understanding and expectations of the IA function. 
(There followed a short recess and the meeting reconvened at 2.27pm) 
14. Internal Audit Strategy & Plan 2026/27 
There was submitted a report by Chief Internal Auditor (26/199) presenting the
Strategy for the delivery of Internal Audit services for Perth and Kinross Council, and
the proposed approach for the direction of planned Internal Audit work for 2026/27. 
In response to a question from Councillor G Laing regarding elected member
input into the plan, J Clark confirmed that the idea could be taken forward and that
she would look to formally consult with members of the Audit and Risk Committee
over the next plan.   
Resolved: 
The strategy and plan for 2026/27, be approved. 
15. National Fraud Initiative 2024/25 Outcomes 
There was submitted a report by Chief Internal Auditor (26/200) outlining the
action that has been taken by Perth & Kinross Council in response to the
requirements of the National Fraud Initiative for 2024/25. 
Councillor G Laing asked for further information regarding the process of blue
badges when someone has passed away and queried if there had been any cases of
others using a blue badge when it does not belong to them. J Clark confirmed that
the process Tell Us Once would be used in connection with blue badges so if a death
has been registered in Perth and Kinross and badge was held, the badge would be
cancelled. J Clark added that internal audit did not see any instances of fraud after
someone had passed, however, J Clark agreed that majority of errors could be that
blue badges have been disposed of or left somewhere not used. In response to a
supplementary question from Councillor G Laing, J Clark confirmed that blue badges
would need to be reapplied for every three years or they would become invalid. J
Page 11 of 92

Page 12

Clark confirmed that internal audit did not receive any reapplications following the
death of a holder. 
Resolved:
(i) It be noted that Perth & Kinross Council takes seriously its obligations for
taking part in the NFI exercise.
(ii) The actions taken by Perth & Kinross Council in response to the requirements
of the NFI, be noted.
(iii) It be noted that the 2024/25 exercise is now complete, with financial outcomes
for Perth & Kinross recorded as £131,236.42. 
16. Strategic Risk Annual Report 
There was submitted a report by Strategic Lead – Legal and Governance
(26/201) (1) providing assurance that the Council’s Risk Management Framework is
adequate and effective and (2) advising the Committee of the current key strategic
risks facing the organisation and how these risks are being mitigated and managed. 
Members thanked officers for their work in developing and monitoring the
Strategic Risk Register. 
Resolved:
(i) The contents of Report 26/201, be considered and appropriate and
constructive challenge and comment, be provided.
(ii) The current key strategic risks which have been identified through the
application of the approved risk management process, be noted.
(iii) The assurance as to adequacy and effectiveness of the risk management
framework, be accepted. 
IT WAS AGREED THAT THE PUBLIC AND PRESS SHOULD BE EXCLUDED
DURING CONSIDERATION OF THE FOLLOWING ITEM IN ORDER TO AVOID
THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN TERMS OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973 
P1. Strategic Risk Annual Report – Appendix 1 SR06 
Resolved: 
The contents of the risk SR06 be noted and assurance be accepted. 
P2. Internal Audit Follow Up – Appendix 2 
There was submitted a report by Chief Internal Auditor (26/192) presenting a
current summary of Internal Audit’s ‘follow up’ work relating to actions due for
completion up to April 2026 (Parkdale Care Home). 
Page 12 of 92

Page 13

Resolved:
The current position in respect of the agreed actions arising from Internal
Audit’s work, outlined in Appendix 2 to Report 26/192, be noted. 
P3 Parkdale Progress Update 
There was submitted a report by Chief Internal Auditor (26/202) providing the
Audit & Risk Committee with a progress report on the control environment at
Parkdale following the appointment of new management. This was as a result of the
initial whistleblowing report considered by the Audit & Risk Committee in December
2025. 
Resolved: 
The progress of the Internal Audit activity, be noted.
Page 13 of 92

Page 14

Page 14 of 92

Page 15

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 21 September 2026 
Report Title: Internal Audit Follow Up 
Report Number: 26/253 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance 
1. Purpose 
1.1 The purpose of this Report is to present current summary of Internal Audit’s
‘follow up’ work relating to actions due for completion up to July 2026. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Follow Up Outcomes
5. Conclusion
6. Impact Value Assessment
7. Appendices 
2. Recommendation 
It is recommended that the Committee: 
2.1 notes the current position in respect of the agreed actions arising from Internal
Audit’s work. 
3. Background/Context 
3.1  The Global Internal Audit Standards in the UK Public Sector (GIAS (UKPS))
and the Code of Practice for the Governance of Internal Audit in UK Local
Government require that the Audit Committee should oversee the tracking
and implementation of actions agreed following audits. 
3.2 Internal Audit request evidence from Services which confirms that actions
have been implemented and, therefore, controls have been improved.
4
Page 15 of 92

Page 16

4. Progress Update 
4.1 There were 8 actions due to be completed up to July 2026. 6 actions have
been verified by Internal Audit as having been satisfactorily completed. The
remaining actions have revised completion dates, as detailed in Appendix 1. 
5 Conclusion 
5.1 Not applicable. 
6. Impact Value Assessment 
6.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
7. Appendices 
7.1 Appendix 1 – Actions with a completion date of up to July 2026 which have
yet to be completed   
Page 16 of 92

Page 17

Appendix 1 
Actions with a completion date up to July 2026 which have yet to be completed
Finding Action  Action owner
& Service
Date(s) Current status Internal
Audit
Opinion
A24-01 - Business Continuity
Management (BCM) Planning 
Action Point : 1.2 
Importance: High 
Audit Committee Date: June
2025 
Our observation highlighted
the need for Business
Continuity Plans (BCPs) to be
regularly updated, particularly
regarding contact details and
emergency actions. Despite
the introduction of a new
template, up to-date BCPs
were not found across all
services. The audit concluded
without verifying signed BCPs
for all services. 
Diarise annual reviews,
with realistic spacing from
2026 onwards.
All Strategic
Leads,
supported by
EP&BC Officer
June 2026 Following on from
other associated
actions being deferred,
this action is now
anticipated to be
completed by
December 2026.
Accepted
A24-01 - Business Continuity
Management (BCM) Planning 
Diarise training and
exercising following each
annual review.
All Strategic
Leads,
June 2026 Following on from
other associated
actions being deferred,
Accepted
4
Page 17 of 92

Page 18

Action Point : 2.2 
Importance: High 
Audit Committee Date: June
2025 
Our observations revealed
that the previous versions of
the BCPs had not routinely
been subject to adequate
testing and communication
(training and exercise) since
prior to the Covid-19
pandemic. Furthermore, the
latest Business Continuity
Management (BCM)
procedure has not been
finalised, preventing us from
providing any comments on
its effectiveness at this stage 
supported by
EP&BC Officer
this action is now
anticipated to be
completed by
December 2026. 
Page 18 of 92

Page 19

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 21 September 2026 
Report Title: Internal Audit Update 
Report Number: 26/254 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to present a summary of Internal Audit’s work
undertaken as part of the Internal Audit Plans for 2025/26 and 2026/27. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Progress Update
5. Outcome from Consultancy Work
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendation 
It is recommended that the Committee: 
2.1 notes progress with Internal Audit activity. 
3. Background/Context 
3.1  The Global Internal Audit Standards in the UK Public Sector (GIAS (UKPS))
and the Code of Practice for the Governance of Internal Audit in UK Local
Government require that the Audit Committee should receive regular
engagement reporting for internal audit activity and on performance relative to
the approved plan. 
5
Page 19 of 92

Page 20

3.2 Work has continued on assignments from Perth & Kinross Council’s Internal
Audit Plans. In addition, work has continued to be undertaken in connection
with the Internal Audit provision for Perth & Kinross’ Integration Joint Board. 
3.3 Internal Audit has commenced preparations for the 2026/27 exercise of the
National Fraud Initiative to ensure that the Council is able to meet the
expectations, in line with the timeline as laid down by Audit Scotland. A report
on this is included on the agenda for this Committee. 
4. Progress Update 
4.1 Appendix 1 shows the status of audits arising from the Internal Audit Plans. 
4.2 Internal Audit is currently involved with further areas of unplanned work.
Where any control issues arise as a result of these, reports will be presented
to the Audit & Risk Committee. 
5. Conclusion 
5.1 Not applicable. 
6. Impact Value Assessment 
6.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
7. Appendices 
7.1 Appendix 1 – Internal Audit Activity 
Page 20 of 92

Page 21

Appendix 1
INTERNAL AUDIT UPDATE
Internal Audit Activity 
Audit
No.
Title Lead Service(s) Status as at
October
2025
Audit
Committee
2025/26    
A25-03 External Funding Multiple Services Ongoing September
2026
A25-10 Payroll Strategic Planning,
People &
Performance
Completed September
2026
A25-11 Assessment &
Charging
Finance & Business
Support
Completed September
2026     
2026/27    
C26-01 Strategic Partnering –
Environment &
Infrastructure
(C25/02 continued)
Environment &
Infrastructure
Ongoing March 2027
A26-02 Risk Maturity Strategic Planning,
People &
Performance 
March 2027
A26-03 Forward Planning All Services  March 2027
A26-04 Assurance Mapping All Services  March 2027
A26-05 Throughcare &
Aftercare
Children, Families &
Justice
Ongoing December
2026
A26-06 Organisational
Behaviour
All Services Ongoing December
2026
A26-07 Complex Needs
Project
Children, Families &
Justice 
June 2027
A26-08 Treasury
Management
Finance & Business
Support
Ongoing December
2026
A26-09 Customer Insights Customer & Digital /
Finance & Business
Support 
June 2027
A26-10 IT Incident
Management
Customer & Digital  June 2027
A26-11 School Estate
Management
Property Services  June 2027
A26-12 Tay Cities Deal Economy,
Development &
Planning 
June 2027
A26-13 Planning Applications Economy,
Development &
Planning
Ongoing December
2026
5
Page 21 of 92

Page 22

A26-14 Public Accessibility
Regulations
Strategic Planning,
People &
Performance 
March 2027
A26-15 Transformation
Delivery & Outcomes
Programmes &
Projects 
March 2027 
Page 22 of 92

Page 23

1 
PKC - GENERAL 
Internal Audit Report
Finance & Business Support
25-11 Assessment & Charging 
September 2026 
Final Report
(Report No. 26/255) 
Legal and Governance
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH 
6
Page 23 of 92

Page 24

2 
PKC - GENERAL
25-11 Assessment & Charging
Contents by Section 
1. Introduction
2. Executive Summary         
3. Audit Background Information        
4. Scope and Limitations         
5. Assessment of the Control Environment      
6. Summary of Findings         
7. Conclusions          
8. Acknowledgement         
9. Action Implementation & Follow Up     
10. Authorisation
11. Distribution
12. Assessment Definitions 
Page 24 of 92

Page 25

3 
PKC - GENERAL
1.  Introduction 
1.1  The audit of Assessment & Charging was undertaken as part of the Internal
Audit plan for 2025/26, which was approved by the Audit & Performance
Committee on 25 June 2025. The period under review for the purposes of the
audit exercise was financial year 2025/26. 
1.2  The indicative scope for the audit was to review progress with the improvement
action plan.
1.3  This audit is not linked to the Strategic Risk Register; it is other assurance work.
1.4 Our review was limited to consideration of whether there is evidence that the
controls documented on the Service’s ‘Audit - Risk’ spreadsheet have been
implemented. 
2.  Executive Summary 
2.1  The audit has found that there is Substantial Assurance that the controls
documented on the Service’s ‘Audit - Risk’ spreadsheet have been
implemented. 
2.2  There are no actions arising from the findings in Section 6. 
3.  Audit Background Information 
3.1 Areas of concern around assessment and charging for Council-placed
residents in care homes and Council-supplied care at home were identified from
a 2016 Internal Audit report and extended follow-ups reported to the then Audit
Committee in 2018 and 2019, a 2018 Changing Point consultants’ report, along
with subsequent Internal Audit advisory activity which took place in 2023.
Responsibility for the Assessment and Charging function transferred from the
Health and Social Care Partnership to the Council’s Finance and Business
Support area in January 2024. 
3.2 On transfer to Finance and Business Support, to ensure that all aspects
highlighted historically by Internal Audit and by Changing Point are managed,
a spreadsheet of the areas of concern was prepared detailing risks and actions.
A review of the areas identified has been undertaken annually by the Service
Manager and Team Leader to identify if they are still relevant, how the risk is
being managed and if any areas have changed. Reviews were undertaken on
9 December 2024 and 24 October 2025 and recorded in the spreadsheet. 
Page 25 of 92

Page 26

4 
PKC - GENERAL
4.  Scope and Limitations 
4.1  The audit has considered the actions recorded and form an opinion on whether
the risks are being mitigated and/or managed.  
4.2 The Internal Audit consisted of reviewing the spreadsheet, identifying actions
and obtain evidence on a test basis of the actions being undertaken and
sustained.
4.3  The audit was limited to the review of the actions documented on the
spreadsheet and any questions arising from the review. This audit is not a
whole-scale review of all activity within Assessment & Charging. 
4.4 The details of the control objectives reviewed and the Internal Audit’s
assessment of their strength of control in each area are contained within
Section 5 of this report. 
5.  Assessment of the Control Environment 
5.1 The table below contains a summary of the number of findings and their ratings,
as detailed in Section 12, against each control objective, along with Internal
Audit’s assessment of the adequacy and effectiveness of the controls in place
to meet each of the objectives agreed for this audit. Further details, including
any improvement actions, are set out in the Management Action Plan. 
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1 To ensure that risks identified from the
areas of concern identified from the
report by Changing Point
consultants and previous audits by the
Internal Audit team have been
mitigated. 
No actions arising Substantial
Assurance 
5.2  The auditor has assessed that Substantial Assurance can be placed on controls
overall in relation to the progress with the improvement plan of Assessment and
Charging from the audit. Meaning:
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to support
the achievement of objectives in the area audited.
5.3  A summary of the key findings are provided in section 6. Please note, however,
the following areas of good practice which have been highlighted during the
audit:
Page 26 of 92

Page 27

5 
PKC - GENERAL
5.4  The service has made substantial progress in completion of monthly
reconciliations; with all historical reconciliations now completed and monthly
reconciliations being maintained on an up-to-date basis. Regular reconciliations
provide assurance that transactions are accurately recorded, balances are
monitored, and any discrepancies are identified and investigated in a timely
manner. This has significantly reduced the risk of mismanagement of client
funds and strengthened the overall financial control environment.
5.5  The process for managing deceased client funds has improved with standard
forms (Microsoft forms) and a more formal approach to obtaining information
from next of kin or executors. This has helped ensure that deceased client
cases are dealt with more quickly and efficiently, reducing the risk of funds
being held by PKC for long periods and improving the timely return of deceased
client monies.
5.6  With reconciliations now up to date and calendar reminders in place,
outstanding bills can be identified quickly and paid on time. This helps ensure
that all payments are monitored regularly and any issues are actioned promptly. 
5.7 The Team Leader is content that an adequate team plan is in place and
appropriate induction, and training arrangements are being delivered for staff. 
5.8 We found that appropriate arrangements are in place to ensure care homes
and care-at-home providers are paid on time, and no significant payment delays
were identified during the audit. As per the Team Leader, care homes are paid
through the Independent Sector Payment (ISP) process on a four-weekly basis
using Mosaic and Integra systems, while care-at-home providers are paid
based on invoices submitted. 
5.9 The current arrangements for working with care homes and care-at-home
providers are effective, with regular meetings helping to resolve issues
promptly. Communication with social workers has also improved through
regular drop-in sessions, training, and ongoing engagement, supporting better
information sharing and joint working between teams. 
5.10 There is clear guidance provided for the staff to follow proper policies and
procedures. The audit did not identify any areas of non-compliance noticed
through the audit. 
5.11 Oversight and engagement from the Strategic Lead – Finance & Business
Support, Finance Manager, and Team Leader have improved significantly,
contributing to continued progress and improvement in this area. 
5.12 Internal Audit is satisfied that all previously identified concerns have been
effectively addressed and the team has implemented a range of improvements,
including completing all outstanding reconciliations, strengthening
management oversight, improving performance monitoring, reducing backlogs,
enhancing staff training, and improving communication with key stakeholders.
These actions have helped strengthen controls and improve the overall
effectiveness of the service.
Page 27 of 92

Page 28

6 
PKC - GENERAL
6.  Summary of Findings 
6.1 Internal Audit has identified below areas where continues controls could be
beneficial particularly in relation to better performance. 
6.2 A reconciliation summary and action (checklists) are maintained and clearly
records the relevant reconciliation period, with comments such as "No action
required" or "No issues identified". We noted that reconciliations are being
completed on a monthly basis and are currently up to date. To support ongoing
effective control operation, management should continue this process
consistently, as it helps to identify any gaps, delays, or recurring issues with
client’s funds. 
6.3 While client’s bills are being paid on time, there are reasonable steps taken for
keeping supporting evidence for these payments. To improve transparency and
provide a clear audit trail, the team should continue to follow the proper
procedure to collect and retain as much supporting evidence as possible, such
as invoices, receipts, and correspondence relating to client payments. This
would help demonstrate that payments are accurate, appropriate, and properly
supported and no further audit action is considered necessary at this time. 
6.4 With diary alerts in place and reconciliations kept up to date, clients
approaching State Pension age can be identified promptly and the necessary
action taken to ensure they receive their pension when due. However, the diary
alert control was not operating consistently for the sample tested and cannot be
fully relied upon. Therefore, management should continue to implement robust
reconciliation to ensure all eligible clients are identified, and State Pension
applications are submitted promptly. No further audit action is considered
necessary at this time. 
6.5 Internal Audit also noted that resource pressures were historically a challenge
for the team. Since the move to Finance and Business Support, action to
address this through recruitment initiatives, including advertising and
restructuring activities has been undertaken. Given the actions already taken,
no further audit action is considered necessary at this time. 
7.  Conclusion 
7.1  The Internal Audit review is able to place Substantial Assurance on the overall
control environment for Assessment and Charging. The agreed actions, once
implemented, should enable Internal Audit to place Substantial assurance on
these.
8.  Acknowledgements 
8.1  Internal Audit would like to thank all officers who were involved in this audit,
particularly officers within the Assessment and Charging team, C Fraser, Team
Leader - Assessment & Charging. 
Page 28 of 92

Page 29

7 
PKC - GENERAL
9.  Action Implementation & Follow up 
9.1  Responsibility for the maintenance of adequate and effective controls rests with
management. Where the audit has identified areas for management action,
these are identified in the Management Action Plan. Where a decision is taken
by management not to act in response to finding from this review, it is the
responsibility of management to assess and accept the risk arising from non-
implementation. 
9.2  Achievement of the agreed actions is monitored through Internal Audit’s ‘follow
up’ arrangements. 
10. Authorisation 
10.1 The auditor for this assignment was M Stewart.  The supervising auditor was D
Arachchilage.
This report is authorised for issue by J Clark 
11.  Distribution 
11.1 This report has been distributed to:
T Glen, Chief Executive
C Mailer, Depute Chief Executive
S Walker, Strategic Lead, Finance & Business Support
C Robertson, Finance Manager/Business Partner 
L Simpson, Strategic Lead, Legal & Governance
Committee Services
External Audit 
Page 29 of 92

Page 30

8 
PKC - GENERAL
12.  Assessment Definitions 
12.1 The following table contains the definitions of the control objective assessment. 
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and control
exist, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in
the area audited.
Reasonable Assurance There is a generally sound system of governance, risk
management and control in place. Some issues, non-compliance
or scope for improvement were identified which may put at risk
the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk
management and control to effectively manage risks to the
achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control is inadequate to
effectively manage risks to the achievement of objectives in the
area audited. 
12.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions. 
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations/ major concerns which require
immediate action. Management will need to add these to the
appropriate Service risk register.
Issue represents a control weakness which could cause, or is
causing, severe disruption of the process or severe adverse
effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of key
controls requiring urgent action. Management should consider
adding these to the appropriate Service/ divisional risk register
Issue represents a control weakness which could have, or is
having, major adverse effect on the ability to achieve process
objectives
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should consider
these when updating any divisional / team risk registers
Page 30 of 92

Page 31

9 
PKC - GENERAL
Issue represents a control weakness which could have, or is
having, significant adverse effect on the ability to achieve process
objectives
2 Low Minor observations regarding the adequacy of controls which
require action to improve the efficiency, effectiveness, or
economy of operations or which otherwise require to be brought
to the attention of Senior Management
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process objectives
1 Trivial / Minor Very minor observations which will be raised during the audit and
may not be included within the final report
Issue represents a very minor control weakness with negligible
impact on the ability to achieve process objectives. The issue will
be raised during the audit and may not be included within the final
report. 
Page 31 of 92

Page 32

Page 32 of 92

Page 33

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 1 
PKC - GENERAL 
Internal Audit Report
Strategic Planning, People and Performance and All Services
25-10 Payroll – Additional Payments 
July 2026 
Final Report
(Report No. 26/256) 
Legal and Governance
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH 
7
Page 33 of 92

Page 34

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 2 
PKC - GENERAL
25-10 Payroll – Additional Payments
Contents by Section 
1. Introduction
2. Executive Summary         
3. Audit Background Information        
4. Scope and Limitations         
5. Assessment of the Control Environment      
6. Summary of Findings         
7. Conclusions          
8. Acknowledgement         
9. Action Implementation & Follow Up     
10. Management Action Plan 
11. Authorisation
12. Distribution
13. Assessment Definitions 
Page 34 of 92

Page 35

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 3 
PKC - GENERAL  
1.  Introduction 
1.1  The audit of Payroll was undertaken as part of the Internal Audit Plan for 2025-
26, which was approved by the Audit & Risk Committee on 25 June 2025. The
period under review for the purposes of the audit exercise was April 2025 to
September 2025 (financial year 2025-26).
1.2  The indicative scope for the audit was to review whether controls are designed
appropriately and operating effectively to ensure that additional payments are
properly authorised, accurate and compliant. 
1.3  The audit included reviewing the processes in place for the planning, recording
and authorising of additional payment claims by managers and of the payments
made through Payroll.
1.4 The audit is not directly linked to any particular risk on the Strategic Risk
Register. 
2.  Executive Summary 
2.1  The audit has found that limited assurance can be placed on the Council’s
internal controls in relation to the additional payments.  
2.2  There are thirty-three actions arising from the findings documented in Section
10. Once these actions are completed, Internal Audit should be able to place
substantial assurance on the arrangements in place. Further four areas for
consideration for improvement were highlighted in Section 6 (paragraph 6.6). 
2.3 It is noted that, whilst the processing of additional payments is subject to
controls within People and Culture, the responsibility for the proper planning,
recording and authorising of additional payment claims lies with managers. 
3.  Audit Background Information 
3.1  As per the Perth and Kinross Council’s (PKC’s) Financial Regulations 2024-27,
the Corporate Human Resource Manager is responsible for the prompt and
accurate payment to employees, and elected members, of additional
payments/deductions and other allowances such as the payment of travel,
overtime, sickness, maternity, paternity, adoption and other allowances in
accordance with statutory and Council policy requirements (the post title for
Corporate Human Resource Manager has now changed to People and Culture
Manager).
3.2 Strategic Leads are responsible for ensuring the prompt submission of accurate
claims for processing, within their area of responsibility, in accordance with
statutory requirements and Council policy.
Page 35 of 92

Page 36

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 4 
PKC - GENERAL
3.3 The People and Culture Manager ensures that adequate procedures are in
place for checking claims for additional payments/deductions and other
allowances, to ensure compliance with statutory provisions and Council policy.
3.4 The People and Culture Manager informs Strategic Leads of any change to the
approved allowances/deductions, or any other factor that may affect the
payment/deductions made.
3.5 The People and Culture Manager issues additional guidance on the submission
of payroll input for additional payments/deductions and other allowances,
specifying the form of each document, the process required, the timescale to
be adhered to, and the required level of authorisation.
3.6 The Working Time Regulations 1998 were introduced into domestic UK
legislation on 1 October 1998. The Regulations provide basic entitlements to
all workers regarding hours of work, night working, rest breaks, daily and weekly
rest and annual leave entitlements. The Regulations have been introduced
under Health and Safety and will be monitored and enforced under the relevant
employment legislation.
3.7 The standard weekly hours for full-time Single Status employees are 36 hours
per week. However, as it is considered essential to maintain the current staffing
levels in certain areas to guarantee service delivery, contracted hours for some
employees may vary. Starting and finishing times will be directed by Strategic
Leads (formerly known as Heads of Service).
3.8 As for Craft employees, they generally work a 37-hour week as outlined in the
Local Agreement approved by both the Council and the appropriate Trade
Unions.
3.9 As per the PKC’s Overtime, Standby and Callout Policy, “work in excess of the
normal hours of duty should be discouraged, and employees should not be
required to consistently work overtime”. Where overtime working is
unavoidable, payment shall be calculated and paid in accordance with the
policy, subject to prior approval by an employee’s line manager who should be
an authorised signatory in accordance with the Council’s Financial Regulations.
As an alternative to payment, compensatory time off in lieu (TOIL) may be
granted. 
3.10 In accordance with the Council’s approved Flexi Time Scheme, overtime hours
must be recorded separately from flexible working hours. Overtime and flexi
time cannot be claimed for the same period.
3.11 Other additional payments include standby, disturbance, sleep in, callout,
temporary higher duty payments (THDP), additional responsibility, night and
shift working allowances. 
4.  Scope and Limitations 
4.1 The Audit has reviewed whether controls are designed appropriately and
operating effectively to ensure that additional payments are properly
authorised, accurate and compliant. In addition, we have evaluated how Payroll
contributes to the commitment to delivering best value in staff costs.
Page 36 of 92

Page 37

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 5 
PKC - GENERAL
4.2  The review consisted of interviews with relevant officers, document reviews and
sample walk-through tests of the payment process from start to finish. 
4.3 There were no limitations identified that would impact the Audit. However, we
did not review additional payments for Teachers. 
4.4  The details of the control objectives reviewed and Internal Audit’s assessment
of their strength of control in each area is contained within Section 5 of this
report.
5.  Assessment of the Control Environment 
5.1  The table below contains a summary of the number of findings and their ratings,
as detailed in Section 12, against each control objective, along with Internal
Audit’s assessment of the adequacy and effectiveness of the controls in place
to meet each of the objectives agreed for this audit. Further details, including
any improvement actions, are set out in the Management Action Plan.
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1 To ensure effectiveness of the
arrangements in place to support
accurate, timely and appropriately
authorised additional payments to
General employees (Single Status
and Craft). 
9 3 5 8 Limited
assurance
2 To confirm that additional payments
comply with relevant regulations. 
1  5  Limited
assurance
3 To determine whether Payroll
function supports management in
achieving best value in terms of staff
costs.  
1  1 Reasonable
assurance 
5.2  The auditor has assessed that limited assurance can be placed on controls
overall in relation to additional payments from the audit. Meaning: “Significant
gaps, weaknesses or non-compliance were identified. Improvement is required
to the system of governance, risk management and control to effectively  
manage risks to the achievement of objectives in the area audited”.  
5.3  A summary of the key findings and actions are provided in section 6, please
note however, the following areas of good practice which have been highlighted
during the audit:
5.3.1  HR pay policies and supporting guidance on the completion of Single Status
claim forms are available online and accessible to relevant staff.
5.3.2 All claims tested were approved by the appropriate signatories in accordance
with the Authorised Signatory Database. No instances of approval outside of
Page 37 of 92

Page 38

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 6 
PKC - GENERAL
the database were identified within the sample tested. Annual reviews of the
Authorised Signatory Database are undertaken to ensure that access remains
accurate and up to date.
5.3.3 In the cases tested, overtime was evidenced as having been approved before
the work was undertaken and appeared to be driven by legitimate operational
requirements rather than ad hoc requests.
5.3.4 There is a strong Payroll commitment to ensuring that payments are processed
in a timely manner without delays. Payments are consistently made on the final
working day of each month, demonstrating Payroll’s adherence to established
processing timelines.
5.3.5 The majority of payroll deadlines are communicated to staff through published
guidance documents and, where appropriate, through internal news pages on
ERIC, and Microsoft Teams channels. This multi-channel approach increases
the visibility of key deadlines and encourages the timely submission of claims
and supporting payroll-related documentation.
5.3.6  Key officer are professionally qualified and hold membership with the Chartered
Institute of Payroll Professionals. They also ensure their knowledge is up to
date through subscriptions to HMRC emails and newsletters. 
5.3.7 The Payroll function operates a structured monthly payroll control process,
which incorporates a range of control activities designed to support the
accuracy of payroll outputs. Exception reports are used and may help identify
payment amounts exceeding expected thresholds, which could include some
instances of overlapping claims. Reconciliation activities are also performed as
part of each payroll cycle, including review of HMRC Gateway statements.
5.3.8 The application of pay rates is automated within the system. Access to update
pay rates is restricted to authorised staff, with appropriate segregation of duties
in place, to prevent a single individual from overriding or manually changing
approved pay rates. Validation and checking processes are performed following
updates to pay tables, including post-update spot checks, to help ensure
accuracy and completeness of changes. 
5.3.9 Tax and National Insurance deductions are calculated automatically in line with
HMRC requirements through compliant system configuration. Whenever
government tax rates or thresholds change, the payroll software is
automatically updated to reflect the revised settings. This supports ongoing
compliance with statutory requirements and reduces reliance on manual
intervention.
5.3.10 At the start of each new financial year, Payroll staff perform gross-to-net pay
calculations to validate compliance with HMRC requirements. The test checks
are also performed following legislative changes, upgrades impacting statutory
tables, and on an ad hoc basis, supporting the retention of manual calculation
knowledge within the team.
5.3.11 When a new pay element is created, it is first implemented in the test
environment to ensure that relevant statutory deductions are applied correctly
before being deployed to the live system.
Page 38 of 92

Page 39

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 7 
PKC - GENERAL
5.3.12 Power BI tool has been introduced and is used to provide useful data to support
more informed decision-making across different levels of management.
Learning sessions have been delivered to help users understand and apply its
functionality effectively. The tool continues to be improved, with additional
elements being regularly added.
A further tool (Power Automate) has been developed, with planned
enhancements including additional alerts and data elements. Together, these
developments demonstrate an ongoing focus on improving monitoring
arrangements and strengthening oversight. 
5.3.13 Relevant teams have access to the payroll information needed to perform their
roles effectively. This supports transparency and enables informed review and
oversight.
5.3.14 Payroll performs monthly escalations in relation to excessive additional
payments identified for management attention. It was observed that, in some
cases, Payroll also suggests or recommends actions to be taken. This provides
additional support to management in addressing payroll-related issues.
5.3.15 Regular reports on overtime expenditure and related trends are provided to
Executive Leadership Team, supporting senior-level oversight of workforce
costs.
5.3.16 A reduction in employee overtime costs was observed compared with the same
period in the prior year. In addition, the rate of growth in agency costs appears
to have slowed, indicating that the reduction in overtime has not been matched
by a proportionate increase in agency expenditure.
5.3.17 Based on the sample reviewed, the order of overtime allocation indicated that
agency staff were used as a last resort. This supports cost control by prioritising
internal resources where possible.
5.3.18 Work undertaken by Organisational and Workforce Change Team supports the
achievement of better value for money. This includes tailored workforce
planning carried and meetings with budget holders to support more efficient
allocation of resources.
5.3.19 The Workforce Planning Themed Board and the Framework for Managing
Workforce Changes provide structure and oversight for decision-making,
implementation activities and coordination across relevant stakeholders. 
6.  Summary of Findings 
6.1  Below is a summary of key findings and actions, which are reflected in the
Management Action Plan, detailed in Section 10. It is noted that, whilst the
processing of additional payments is subject to controls within People and
Culture, the responsibility for the proper planning, recording and authorising of
additional payment claims lies with managers. 
Page 39 of 92

Page 40

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 8 
PKC - GENERAL
6.2  To ensure effectiveness of the arrangements in place to support accurate,
timely and appropriately authorised additional payments to General
employees (Single Status and Craft):
6.2.1 There is no formally coordinated training for managers on claim authorisation
processes or on compliance with pay policies. Guidelines on managerial checks
are not a formal part of managers’ induction programmes. The control operates
with significant reliance on managers’ understanding of the policies and
guidelines and on informal knowledge transfer from colleagues. 
[Action Point 1]
6.2.2 The majority of additional payment claims are submitted and authorised in
paper format outside the payroll system. As a result, authorisations must be
verified manually before claims are processed. This approach is time-
consuming and increases the risk of fraud or error. 
Opportunities to introduce a system-based managerial approval workflow and
greater automation of the claim process should be further explored to
strengthen controls and improve operational efficiency.          
[Action Point 2]
6.2.3 Current arrangements place significant reliance on managerial review and
authorisation. Testing identified instances where timesheets contained
inaccuracies and calculation errors that were not identified or corrected during
authorisation process. This indicates that the level of verification performed by
authorising managers may not always be sufficient to identify errors. 
Managerial authorisation should therefore include explicit verification of claim
accuracy, including calculations, day types, dates, times and reasons.  
[Action Point 3]
6.2.4 Not all managers contacted during testing maintained records or supporting
documentation that could be used to verify the accuracy of claims. 
Managers should ensure that they retain sufficient records to support the
effective review and authorisation of claims, particularly where claims are
authorised in the line manager’s absence.          
[Action Point 4]
6.2.5 It was observed that required information was not consistently captured in claim
forms, despite completeness being a requirement of the guidance (“Date, Day
Type, From, Break Taken, To, Hours Claimed, Reason columns must be
completed in all cases”). Managerial authorisation should therefore include
completeness checks. 
In addition, one manager was observed to have added missing working pattern
details that appeared to be incorrect in a number of instances. Where
incomplete information is identified, managers should ensure that any missing
details are completed accurately.
Page 40 of 92

Page 41

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 9 
PKC - GENERAL
[Action Point 5]
6.2.6 Some sampled claim forms were signed and dated by employees at various
stages of the claimed period, including before all claimed time had been worked
and, in other cases, weeks or months after the work had been completed. 
Timekeeping practices should be improved to support the timely and accurate
recording of time worked. Employees should complete claim forms as work is
performed and sign them at the end of the relevant period, rather than in
advance or significantly after the event.
[Action Point 6]
6.2.7 Older versions of Single Status claim forms (for part-time additional hours,
overtime hours and sleep-in payments, as well as for standby and disturbance
allowances), which are not aligned with the current forms used in the PKC, were
found to be in use by some teams. These forms did not include key fields such
as break length, overtime reason, working pattern day types or employee
declaration, and some also contained outdated pre-populated pay rates. This
creates a risk of inaccurate or inconsistent claim completion and may result in
incorrect payments.
[Action Point 7]
6.2.8 Where claim forms are pre-completed, there is an increased risk that outdated
or inaccurate information may be carried forward into claims, potentially
affecting the accuracy of payment processing. 
[Action Point 8]
6.2.9 We identified some inconsistencies in the forms used for the same type of
payment, including across comparable roles within the same service area. This
increases the risk that required information may not be captured consistently. 
Managers should ensure that employees are aware which claim form to use for
each type of payment.
[Action Point 9]
6.2.10 Despite the guidance explaining which post title should be entered in the
relevant field of the claim form, this requirement still appears to be either
misunderstood or misinterpreted by employees and managers. 
For example, during the sample testing we identified an instance where
employee, on a number of occasions across several pay periods, recorded their
substantive post on the claim forms, rather than the lower-graded post being
covered. As a result, for few months overtime was paid at a higher rate than
Page 41 of 92

Page 42

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 10 
PKC - GENERAL
appropriate, despite the claim reasons indicating that the work was related to
covering a vacancy and a sickness for a different post. 
According to Payroll, employees should be paid based on the post being
covered rather than their substantive post. Payments are processed based on
the post title recorded on the claim form and authorised by the manager, rather
than on the analysis of the reason for the additional work. 
This highlights a weakness in overtime approval controls and increases the risk
of payments being processed at an incorrect rate. 
Managers should ensure that the post title recorded on the claim form reflects
the duties undertaken, rather than the employee’s substantive role. 
It should be considered whether claim forms could be amended to distinguish
between an employee’s substantive post and the post for which the claim is
submitted. Separate fields for each would help to reduce the risk of claims being
processed at an incorrect rate.
[Action Point 10]
6.2.11 Payroll staff do not routinely validate claim form inputs, including calculations,
eligibility or alignment with supporting timekeeping records such as rotas.
System validation is limited to confirming that employee and post numbers exist
and does not verify that they relate to the correct employee. Manual validation
is also limited and generally focuses on contracted hours and post details. 
As a result, significant reliance is placed on managerial approval, except where
issues are sufficiently obvious to be identified during payroll processing. This
control weakness increases the risk of error, fraud and incorrect payments.
[Action Point 11]
6.2.12 Overtime rates depend on employees’ work patterns and day types, however,
these are not routinely validated during payroll processing due to the time
required to complete them, including where day type information is missing from
claim forms. While working pattern information is available within the payroll
system, it does not clearly distinguish between non-working and rest days. 
As a result, where day type information is unavailable on the claim forms or
cannot be readily verified, Payroll staff default to applying straight time for initial
overtime hours. This increases the risk of incorrect pay elements, overtime
rates and multipliers being applied, potentially resulting in underpayments.
[Action Point 12]
6.2.13 Pay elements are allocated manually by payroll staff before being entered into
the payroll system. Testing identified occasional instances where inappropriate
Page 42 of 92

Page 43

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 11 
PKC - GENERAL
pay elements or incorrect unit quantities were applied, resulting in payment
errors. Reliance on manual allocation increases the risk of mistakes.
Opportunities to automate the allocation of pay elements should be explored to
reduce reliance on manual intervention and improve the accuracy and
consistency of payroll processing.
[Action Point 13]
6.2.14 While monthly payroll submission deadlines are in place for Single Status
employees, there is no formally defined time limit for the submission of claim
forms relating to previous periods. As a result, claims may be submitted several
months after the work was performed, increasing the risk of delayed processing
and inaccuracies where claim details are completed or approved after the
event. 
The absence of a formal cut-off date also reduces visibility of outstanding
historical claims and assurance that all claims relating to a period have been
identified and processed. Late submissions may affect the accuracy of budget
monitoring and alter the payroll period in which pensionable pay and National
Insurance contributions are calculated. 
Consideration should be given to introducing a formal cut-off date for
retrospective claims and strengthening proactive follow-up by managers,
including timely enquiries where claim forms are not submitted within expected
timeframes.
[Action Point 14]
6.2.15 No formal claim submission deadlines have been established for Craft
employees. This results in inconsistent submission practices and reduces
assurance that claims are submitted in a timely manner. In the absence of
defined deadlines, delayed submissions may not be identified and followed up
promptly by managers. 
[Action Point 15]
6.2.16 Manual and system-based (MyView) claims are processed through separate
arrangements and are not routinely reconciled against one another. Payroll
does not routinely perform checks to identify overlapping or incompatible claims
across different sources, including manual claim forms, system-generated
claims and flexi time records (Optimum). 
Employees may submit additional payment claims that overlap with other
recorded absences (for example, annual leave or sick leave), payments, flexi
time records or standby commitments, contrary to the requirements of the
Overtime, Standby and Callout and the Flexi Scheme policies, which outline
Page 43 of 92

Page 44

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 12 
PKC - GENERAL
that overtime and flexitime cannot be claimed for the same period. This
increases the risk of duplicate or incompatible claims being processed and paid.
While managerial authorisation and exception reporting provide key level of
control, these arrangements may not identify all conflicts between claims,
particularly where managers oversee large teams or do not maintain supporting
records to validate claims. 
Managers should ensure that claims do not conflict with each other prior to
authorising them.
Consideration should be given to introducing automated validation or
reconciliation controls to identify overlapping claims and reduce reliance on
manual checks where applicable. 
[Action Point 16]
6.2.17 We identified that there are no automated controls in place to prevent
employees from exceeding the maximum permitted flexi time debit balance or
taking more flexi leave than allowed under the Flexi Scheme Policy. The system
also permits flexi leave to be booked where an employee has already exceeded
the permitted debit balance. 
Responsibility for monitoring compliance with the Flexi Scheme Policy rests
with managers. Although managers have access to employees’ flexi time
balances, there are currently no alerts or exception reports to proactively notify
them of potential breaches or excessive debit balances, as was previously the
case. As a result, identification of non-compliance with the policy requirements
relies on managers carrying out regular manual reviews and may not occur in
a timely manner. 
In addition, the system automatically deducts thirty minutes where lunch breaks
are not recorded. While this provides a default control, it may not always reflect
actual break durations and could affect the accuracy of flexi time balances.
Collectively, these control weaknesses increase the risk of inaccurate flexi time
records, excessive debit balances and unauthorised flexi leave. They may also
result in financial loss to the PKC, particularly where employees with significant
debit balances terminate their employment and Payroll is required to recover
the overpaid amount, which may not always be fully recoverable.
[Action Point 17]
6.3  To confirm that additional payments comply with relevant regulations:
6.3.1 No formal schedule is in place for the periodic review of policies and guidance.
As a result, number of documents have not been reviewed for over five years
(the Flexi Scheme Policy was last revised in February 2019; Time Off for
Page 44 of 92

Page 45

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 13 
PKC - GENERAL
Medical Appointments Policy in December 2018; Guidance on Personal Breaks
in December 2018). 
This increases the risk that policies and guidance become outdated and that
employees and managers may rely on inaccurate or obsolete information. For
example, the Flexi Scheme Policy continues to reference the use of flexi cards
and flexi machines for clocking in and out, despite these arrangements no
longer being in use.
[Action Point 18]
6.3.2 Pay guidelines are not consistently updated following annual changes to pay
and related arrangements. Some reference links within the guidelines have not
been maintained and are no longer functional, including links to the Scheduled
Pay Periods document. Examples were identified within the Which Timesheet
Guidance, the Guide for Completion of Payment Claim Single Status and the
Payroll FAQ document (last reviewed in July 2022). 
In addition, two guidance documents reviewed (the Guide for Completion of
Payment Claim Form Single Status and the Guide for Completion of Casual
Worker Claim Form SS) continue to refer to superseded service names: ESC
and CDS.
This may reduce the effectiveness of the guidance, limit access to supporting
information and undermine confidence that users are referring to accurate and
up-to-date information, even where the refenced document remains available
elsewhere on ERIC.
[Action Point 19]
6.3.3 Policy and guidance reviews do not consistently identify all content requiring
amendment or removal. As a result, outdated information may remain within
published documentation despite reviews having been undertaken. 
For example, although the Overtime, Standby and Callout Policy was reviewed
on several occasions following changes to the vehicle workshop employees’
terms and conditions (arising from the transition from Craft to Single Status), it
was not fully updated to reflect those changes. In particular, the Craft Local
Agreement 2011 (Vehicle Workshop) that had been discontinued in 2022
continued to be referenced within the policy until December 2025.
Furthermore, the same obsolete agreement remained published within the Pay
Policies section of the PKC’s website until that date and continues to be
available within the Craft Employees section. 
This increases the risk of employees relying on superseded documentation and
may create confusion regarding current terms, conditions and related
arrangements.
Page 45 of 92

Page 46

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 14 
PKC - GENERAL
[Action Point 20]
6.3.4 During interviews and testing, we were unable to identify a designated officer
or team with overall responsibility for monitoring compliance with the Working
Time Regulations and overseeing related activities. As a result, there appeared
to be limited central oversight of working hours, opt-out agreements and
associated regulatory requirements.
No opt-out agreements were identified within the Resourcelink records
reviewed during testing. This included an employee whose average working
hours over a seventeen-week period were 61 hours per week. Under the
Working Time Regulations, a documented opt-out agreement should be in
place where working patterns have the potential to exceed an average of 48
hours per week over the relevant reference period (seventeen weeks).
Evidence of such an arrangement was not available within the record
examined. 
However, we acknowledge that, subsequently to the audit testing period, steps
were taken by People and Culture Team to strengthen the controls. In April
2026, an online opt-out form was introduced, and communication was issued
to employees regarding completion and renewal requirements. Managers were
also separately reminded of their responsibilities. 
We further noted that MyView reminders are now expected to support annual
renewal of opt-out forms and that working patterns will be reviewed where an
employee without an opt-out agreement is identified as exceeding the 48-hour
average limit. In addition, we were advised that the updated arrangements
include a dedicated reporting solution to proactively identify such employees.
[Action Point 21]
6.3.5 Payroll reconciliations are performed as part of each pay cycle and include
consistency checks between payroll reports, review of HMRC Gateway
statements, confirmation of payments made, and spot checks of PAYE and
National Insurance values reported through Full Payment Submission (FPS)
and Employer Payment Summary (EPS) submissions. 
However, while individual review activities are performed, there is no routine
documented end-to-end numerical reconciliation of the total PAYE and National
Insurance amounts across all sources - payroll reports, FPS and EPS
submissions (as applicable), HMRC statements and payments made to HMRC.
In our inquiry, we were advised that review of HMRC statements is considered
sufficient to identify any outstanding amounts or discrepancies and that any
variances arising would be captured through existing processes, for example,
through the HMRC Annual Return spreadsheet. However, assurance over the
completeness and accuracy of reported amounts relies on a combination of
Page 46 of 92

Page 47

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 15 
PKC - GENERAL
separate review activities, rather than a single documented reconciliation
across all key stages of the payroll reporting and payment process. 
The control framework could be strengthened by introducing a documented
monthly end-to-end numerical reconciliation of the total PAYE and National
Insurance amounts across these sources, with any variances identified,
investigated, documented and resolved. This would provide clear evidence that
reported amounts are complete, accurate and consistent.
[Action Point 22]
6.3.6 An overpayment recovery process is in place, and a draft policy has been
developed to formalise the process. However, as the policy has not yet been
approved, there is a risk that the process may not be applied consistently.         
[Action Point 23]
6.4 To determine whether Payroll function supports management in
achieving best value in terms of staff costs:
6.4.1 In certain services, there appears to be a continued reliance on overtime to
support routine operations. This is inconsistent with the Overtime, Standby and
Callout Policy, which states that employees should not be required to
consistently work overtime. 
The pattern of overtime usage suggests that it is being used to address
workforce resourcing pressures. Audit testing identified examples where
overtime was used over extended periods to maintain service delivery while
vacancies remained unfilled for prolonged periods, indicating resourcing
pressures in certain areas. 
Consideration should be given to identifying further opportunities to reduce
reliance on overtime in areas where it is routinely used to support service
delivery, including through measures aimed at reducing the duration of
vacancies where appropriate.
[Action Point 24]
6.5  Please note that there are nine other minor actions for the improvement in the
control environment which are included within the management action plan.      
[Action Points 25-33]
6.6 In addition, the following improvement opportunities have been identified for
consideration to further support the achievement of best value in terms of staff
costs:
6.6.1 We have noted instances where overtime claims submitted by employees
participating in the Flexi Scheme related to work carried out during the
Page 47 of 92

Page 48

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 16 
PKC - GENERAL
qualifying flexi time band (typically, between 17:00 and 21:00, and between
07:00 and 08:45). While this is not inconsistent with the council’s policies,
providing managers with guidance to consistently consider available flexi time
arrangements, where operationally appropriate, before approving additional
payments for hours worked within the qualifying flexi time band, may support
consistent decision-making and help achieve best value in relation to staff
costs. Wider promotion of TOIL arrangements, where appropriate, may also
support better value for money by reducing reliance on additional payments.
6.6.2 Periodic communication and reminders may help improve managers’
awareness of Power BI functionality and encourage its regular use. As the tool
supports the monitoring of staff costs, including overtime, its greater utilisation
may contribute to achieving best value in relation to staff costs.
6.6.3 Consideration could be given to further developing Power BI to include
benchmarking functionality, enabling budget holders to compare overtime
levels with comparable services or teams. In addition, enhancing Power BI
interface to provide the Organisational and Workforce Change team with a
council-wide view of data may improve oversight and reduce the need to review
individual teams separately.
6.6.4 Managers may wish to maintain records of overtime decisions, including the
rationale for approval and allocation order. This would provide evidence of prior
authorisation, support transparency in decision-making, and help evidence that
overtime decisions were made with due regard to achieving best value in staff
costs. 
7.  Conclusion 
7.1  The Internal Audit review is able to place limited assurance on the overall
control environment for the additional payments. The agreed actions, once
implemented, should enable Internal Audit to place substantial assurance on
these. 
8.  Acknowledgements 
8.1  Internal Audit would like to thank all officers who were involved in this audit,
particularly: 
L Byrne, HR Team Leader – Payroll and Reward
A Craik, MyView and People Analytics Team Leader
R Cassels, HR Officer - Payroll
G McCaw, Organisational and Workforce Change Team Leader
Page 48 of 92

Page 49

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 17 
PKC - GENERAL
E Bayne, Employee Relations and Wellbeing Team Leader
M Fyfe-Loudon, Senior HR Assistant – MyView and People Analytics Team
J Newman, HR Payroll Assistant
A Craig, Financial Systems Team Leader. 
9.  Action Implementation & Follow up 
9.1  Responsibility for the maintenance of adequate and effective controls rests with
management. Where the audit has identified areas for management action,
these are identified in the Management Action Plan. Where a decision is taken
by management not to act in response to finding from this review, it is the
responsibility of management to assess and accept the risk arising from non-
implementation. 
9.2  Achievement of the agreed actions is monitored through Internal Audit’s ‘follow
up’ arrangements.
Page 49 of 92

Page 50

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 18 
PKC - GENERAL
10.  Management Action Plan 
Action
Point Para. No Finding Risk
Rating Agreed Action & Evidence Action Owner
Target
Completion
Date
1 6.2.1 There is no formally
coordinated training for
managers on claim
authorisation processes or on
compliance with pay policies.
Guidelines on managerial
checks are not a formal part of
managers’ induction
programmes. The control
operates with significant
reliance on managers’
understanding of the policies
and guidelines and on informal
knowledge transfer from
colleagues. 
2 - Low Agreed action: 
Cross-team action involving: 
Organisational Development
team - incorporate
requirements into manager
induction.
Policy team - provide input for
the training video to ensure
overtime policy is adequately
covered. 
Payroll team - provide input on
claim processes, completion
requirements and common
errors. 
Agreed evidence: 
Manager learning materials
published and incorporated into
manager induction programme. 
C Judge,
Organisational
Development Team
Leader 
Dec 2026
2 6.2.2 The majority of additional
payment claims are submitted
and authorised in paper format
4 - High Agreed action: 
Explore the feasibility of
automating Single Status claim
submission and approval
A Craik, 
MyView and People
Analytics Team
Leader
Jun 2027
Page 50 of 92

Page 51

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 19 
PKC - GENERAL
outside the payroll system. As a
result, authorisations must be
verified manually before claims
are processed. This approach
is time-consuming and
increases the risk of fraud or
error. 
Opportunities to introduce a
system-based managerial
approval workflow and greater
automation of the claim process
should be further explored to
strengthen controls and
improve operational efficiency.
through the MyView Irregular
Claims Module to reduce
reliance on manual verification
of authorised signatories
against the Authorised
Signatory Database (ASD). 
Agreed evidence: 
Evidence of engagement with
Zellis regarding MyView
Irregular Claims functionality
and a documented specification
to handle self-service claims
within the General Payroll. 
L Byrne,
HR Team Leader –
Payroll and Reward 
3 6.2.3  Current arrangements place
significant reliance on
managerial review and
authorisation. Testing identified
instances where timesheets
contained inaccuracies and
calculation errors that were not
identified or corrected during
authorisation process. This
indicates that the level of
verification performed by
authorising managers may not
4 - High  Agreed action: 
Develop and publish a Manager
Authorisation Checklist and
support guidance for
overtime/additional payments. 
The guidance will set out the
checks expected before
authorising claims. 
Agreed evidence: 
Published Manager
Authorisation Checklist and
supporting guidance available
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 51 of 92

Page 52

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 20 
PKC - GENERAL
always be sufficient to identify
errors. 
Managerial authorisation
should therefore include explicit
verification of claim accuracy,
including calculations, day
types, dates, times and
reasons. 
on Eric and communicated to
managers.
4 6.2.4 Not all managers contacted
during testing maintained
records or supporting
documentation that could be
used to verify the accuracy of
claims. 
Managers should ensure that
they retain sufficient records to
support the effective review and
authorisation of claims,
particularly where claims are
authorised in the line
manager’s absence.
4 - High Agreed action: 
Record retention requirements
for authorising managers will be
incorporated within the checklist
and guidance under Action 3. 
Agreed evidence: 
Evidence as detailed under
Action Point 3 - published
Manager Authorisation
Checklist and supporting
guidance available on Eric and
communicated to managers. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
5 6.2.5 It was observed that required
information was not
consistently captured in claim
forms, despite completeness
3 -
Medium
Agreed action: 
Requirement for managers to
verify that claim forms are
complete and accurately
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 52 of 92

Page 53

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 21 
PKC - GENERAL
being a requirement of the
guidance (“Date, Day Type,
From, Break Taken, To, Hours
Claimed, Reason columns
must be completed in all
cases”). Managerial
authorisation should therefore
include completeness checks.
In addition, one manager was
observed to have added
missing working pattern details
that appeared to be incorrect in
a number of instances. Where
incomplete information is
identified, managers should
ensure that any missing details
are completed accurately.
completed before authorisation
will be included in the guidance. 
Agreed evidence: 
Evidence as detailed under
Action Point 3 – published
Manager Authorisation
Checklist and supporting
guidance available on Eric and
communicated to managers. 
6 6.2.6 Some sampled claim forms
were signed and dated by
employees at various stages of
the claimed period, including
before all claimed time had
been worked and, in other
cases, weeks or months after
the work had been completed. 
3 -
Medium
Agreed action: 
The Manager Authorisation
Checklist and supporting
guidance developed under
Action 3 will reinforce
expectations regarding the
timely completion, submission
and authorisation of claims. 
Agreed evidence: 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 53 of 92

Page 54

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 22 
PKC - GENERAL
Timekeeping practices should
be improved to support the
timely and accurate recording
of time worked. Employees
should complete claim forms as
work is performed and sign
them at the end of the relevant
period, rather than in advance
or significantly after the event.
Evidence as detailed under
Action Point 3 – published
Manager Authorisation
Checklist and supporting
guidance available on Eric and
communicated to managers. 
7 6.2.7 Older versions of Single Status
claim forms (for part-time
additional hours, overtime
hours and sleep-in payments,
as well as for standby and
disturbance allowances), which
are not aligned with the current
forms used in the PKC, were
found to be in use by some
teams. These forms did not
include key fields such as break
length, overtime reason,
working pattern day types or
employee declaration, and
some also contained outdated
pre-populated pay rates.
3 -
Medium
Agreed action: 
The issue raised in this finding
has now been partially
addressed through the
introduction of updated
Payment Claim Form for the
teams referred above (covering
part-time hours, overtime hours
and sleep-in payments).
However, the action remains
partially complete, as the
effectiveness of the revised
forms depends on employees
consistently using the current
approved versions rather than
any previous forms. 
Payroll will email the relevant
service confirming the
requirement to use only current
approved version of the forms.
L Byrne,
HR Team Leader –
Payroll and Reward 
Sep 2026
Page 54 of 92

Page 55

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 23 
PKC - GENERAL
This creates a risk of inaccurate
or inconsistent claim
completion and may result in
incorrect payments.
Where outdated forms are
identified during payroll
processing, these will be
returned for resubmission using
the current approved version. 
Agreed evidence: 
Payroll will retain copy of the
email to the relevant service
confirming the requirement to
use the current approved
published form. 
8 6.2.8 Where claim forms are pre-
completed, there is an
increased risk that outdated or
inaccurate information may be
carried forward into claims,
potentially affecting the
accuracy of payment
processing.
2 - Low Agreed action: 
The Manager Authorisation
Checklist and supporting
guidance developed under
Action 3 will remind managers
to verify the accuracy and
relevance of any pre-populated
information prior to
authorisation. 
Agreed evidence: 
Evidence as detailed under
Action Point 3 – published
Manager Authorisation
Checklist and supporting
guidance available on Eric and
communicated to managers. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 55 of 92

Page 56

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 24 
PKC - GENERAL
9 6.2.9 We identified some
inconsistencies in the forms
used for the same type of
payment, including across
comparable roles within the
same service area. This
increases the risk that required
information may not be
captured consistently.
Managers should ensure that
employees are aware which
claim form to use for each type
of payment.
2 - Low Agreed action: 
Payroll will review and
rationalise guidance relating to
additional payment claim forms
and will communicate the
approved forms to be used for
each claim type. The Manager
Authorisation Guidance
developed under Action 3 will
also reinforce managers'
responsibilities for ensuring the
correct claim form is used prior
to authorisation. Where non-
approved forms are received,
they will be returned for
resubmission using the
appropriate approved form. 
Agreed evidence: 
Updated payroll guidance and
communication issued to
managers and employees
confirming the approved claim
forms for each payment type.
Evidence of the Manager
Authorisation Guidance
published under Action 3. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
10  6.2.10 Despite the guidance
explaining which post title
should be entered in the
4 - High Agreed action: 
The overtime claim form and
guidance will be updated to
clarify that where additional
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 56 of 92

Page 57

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 25 
PKC - GENERAL
relevant field of the claim form,
this requirement still appears to
be either misunderstood or
misinterpreted by employees
and managers. 
According to Payroll,
employees should be paid
based on the post being
covered, rather than their
substantive post. Payments are
processed based on the post
title recorded on the claim form
and authorised by the manager,
rather than on the analysis of
the reason for the additional
work. 
This highlights a weakness in
overtime approval controls and
increases the risk of payments
being processed at an incorrect
rate. 
Managers should ensure that
the post title recorded on the
claim form reflects the duties
work is undertaken outside an
employee's substantive post,
the appropriate claim process
must be used. Guidance will be
provided to managers and
employees to support correct
completion and authorisation of
claims. This requirement will
also be incorporated into the
Manager Authorisation
Guidance developed under
Action 3. 
Agreed evidence: 
Updated overtime claim form,
supporting guidance and
Manager Authorisation
Guidance issued to managers. 
Page 57 of 92

Page 58

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 26 
PKC - GENERAL
undertaken, rather than the
employee’s substantive role. 
It should be considered
whether claim forms could be
amended to distinguish
between an employee’s
substantive post and the post
for which the claim is submitted.
Separate fields for each would
help to reduce the risk of claims
being processed at an incorrect
rate. 
11 6.2.11 Payroll staff do not routinely
validate claim form inputs,
including calculations, eligibility
or alignment with supporting
timekeeping records such as
rotas. System validation is
limited to confirming that
employee and post numbers
exist and does not verify that
they relate to the correct
employee. Manual validation is
also limited and generally
focuses on contracted hours
and post details. 
4 - High Agreed action: 
The Manager Authorisation
Checklist and supporting
guidance developed under
Action 3 will clarify managers'
responsibilities for verifying
claim accuracy, eligibility and
supporting information before
authorisation. 
Agreed evidence: 
Evidence as detailed under
Action 3 - published Manager
Authorisation Checklist and
supporting guidance available
on Eric and communicated to
managers.
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 58 of 92

Page 59

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 27 
PKC - GENERAL
As a result, the reliance is
placed on managerial approval,
except where issues are
sufficiently obvious to be
identified during payroll
processing. This control
weakness increases the risk of
error, fraud and incorrect
payments. 
12 6.2.12 Overtime rates depend on
employees’ work patterns and
day types, however, these are
not routinely validated during
payroll processing due to the
time required to complete them,
including where day type
information is missing from
claim forms. While working
pattern information is available
within the payroll system, it
does not clearly distinguish
between non-working and rest
days. 
As a result, where day type
information is unavailable on
the claim forms or cannot be
4 - High Agreed action: 
The Manager checklist and
guidance will incorporate that
day types must be detailed on
the claim form. 
Agreed evidence: 
Evidence as detailed under
Action 3 - published Manager
Authorisation Checklist and
supporting guidance available
on Eric and communicated to
managers.
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 59 of 92

Page 60

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 28 
PKC - GENERAL
readily verified, Payroll staff
default to applying straight time
for initial overtime hours. 
This increases the risk of
incorrect pay elements,
overtime rates and multipliers
being applied, potentially
resulting in underpayments. 
13 6.2.13 Pay elements are allocated
manually by Payroll staff before
being entered into the payroll
system. Testing identified
occasional instances where
inappropriate pay elements or
incorrect unit quantities were
applied, resulting in payment
errors. Reliance on manual
allocation increases the risk of
mistakes.
Opportunities to automate the
allocation of pay elements
should be explored to reduce
reliance on manual intervention
and improve the accuracy and
4 - High Agreed action: 
Payroll will strengthen quality
assurance arrangements by
introducing periodic spot
checks across the end-to-end
process to verify that:
• claims have been
prepared correctly;
• information has been
accurately transferred to
payroll upload
documentation;
• the correct pay elements
and values have been
uploaded; and
• payments have been
processed correctly
through to employee
payslips. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Mar 2027
Page 60 of 92

Page 61

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 29 
PKC - GENERAL
consistency of payroll
processing.
Whilst opportunities for
automation will continue to be
explored, the complexity of the
current overtime and additional
payments framework means
that full automation is not
currently feasible.
Payroll will therefore continue to
strengthen validation and
assurance checks to mitigate
the risk of processing or upload-
related errors and will consider
further improvements as part of
future payroll system
developments and any wider
review of overtime
arrangements. 
Agreed evidence
A documented programme of
payroll spot checks covering
authorised claim forms, payroll
upload documentation, payroll
system records and employee
payslips. 
Records of spot checks
undertaken, findings identified,
corrective action taken and
lessons learned communicated
to the payroll team. 
Page 61 of 92

Page 62

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 30 
PKC - GENERAL
14 6.2.14 While monthly payroll
submission deadlines are in
place for Single Status
employees, there is no formally
defined time limit for the
submission of claim forms
relating to previous periods. As
a result, claims may be
submitted several months after
the work was performed,
increasing the risk of delayed
processing and inaccuracies
where claim details are
completed or approved after
the event. 
The absence of a formal cut-off
date also reduces visibility of
outstanding historical claims
and assurance that all claims
relating to a period have been
identified and processed. Late
submissions may affect the
accuracy of budget monitoring
and alter the payroll period in
which pensionable pay and
2 - Low Agreed action: 
Will reflect a 3-month cut-off
date within the Manager’s
guidance and on claim forms. 
Agreed evidence: 
Evidence as detailed under
Action 3 - published Manager
Authorisation Checklist and
supporting guidance available
on Eric and communicated to
managers.
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 62 of 92

Page 63

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 31 
PKC - GENERAL
National Insurance
contributions are calculated. 
Consideration should be given
to introducing a formal cut-off
date for retrospective claims
and strengthening proactive
follow-up by managers,
including timely enquiries
where claim forms are not
submitted within expected
timeframes.
15 6.2.15 No formal claim submission
deadlines have been
established for Craft
employees. This results in
inconsistent submission
practices and reduces
assurance that claims are
submitted in a timely manner. In
the absence of defined
deadlines, delayed
submissions may not be
identified and followed up
promptly by managers.
2 - Low Agreed action: 
A formal submission deadline
document will be created for
Craft employees. 
Agreed evidence: 
Updated submission deadlines
on Eric.
L Byrne,
HR Team Leader –
Payroll and Reward 
Completed 
Page 63 of 92

Page 64

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 32 
PKC - GENERAL
16 6.2.16 Manual and system-based
(MyView) claims are processed
through separate arrangements
and are not routinely reconciled
against one another. Payroll
does not routinely perform
checks to identify overlapping
or incompatible claims across
different sources, including
manual claim forms, system-
generated claims and flexi time
records (Optimum). 
Employees may submit
additional payment claims that
overlap with other recorded
absences (for example, annual
leave or sick leave), payments,
flexi time records or standby
commitments, contrary to the
requirements of the Overtime,
Standby and Callout and the
Flexi Scheme policies, which
outline that overtime and
flexitime cannot be claimed for
the same period. This
increases the risk of duplicate
4 - High Agreed action: 
The Manager Authorisation
Checklist and supporting
guidance developed under
Action 3 will include guidance
on verifying that claims do not
conflict with annual leave,
sickness absence, flexi
arrangements, standby
commitments or other working
arrangements. 
Agreed evidence: 
Evidence as detailed under
Action 3 - published Manager
Authorisation Checklist and
supporting guidance available
on Eric and communicated to
managers. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 64 of 92

Page 65

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 33 
PKC - GENERAL
or incompatible claims being
processed and paid.
While managerial authorisation
and exception reporting provide
key level of control, these
arrangements may not identify
all conflicts between claims,
particularly where managers
oversee large teams or do not
maintain supporting records to
validate claims. 
Managers should ensure that
claims do not conflict with each
other prior to authorising them.
Consideration should be given
to introducing automated
validation or reconciliation
controls to identify overlapping
claims and reduce reliance on
manual checks where
applicable.
17 6.2.17 We identified that there are no
automated controls in place to
prevent employees from
exceeding the maximum
4 - High Agreed action: 
Reinforce flexi time rules to
managers, as responsibility for
spot checking flexi balances lies
A Craik, 
MyView and People
Analytics Team
Leader 
Mar 2027
Page 65 of 92

Page 66

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 34 
PKC - GENERAL
permitted flexi time debit
balance or taking more flexi
leave than allowed under the
Flexi Scheme Policy. The
system also permits flexi leave
to be booked where an
employee has already
exceeded the permitted debit
balance. 
Responsibility for monitoring
compliance with the Flexi
Scheme Policy rests with
managers. Although managers
have access to employees’ flexi
time balances, there are
currently no alerts or exception
reports to proactively notify
them of potential breaches or
excessive debit balances, as
was previously the case. As a
result, identification of non-
compliance with the policy
requirements relies on
managers carrying out regular
manual reviews and may not
occur in a timely manner.
with them, through guidance
and communications. 
Agreed evidence: 
Evidence as detailed under
Action 3 - published Manager
Authorisation Checklist and
supporting guidance available
on Eric and communicated to
managers.
Page 66 of 92

Page 67

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 35 
PKC - GENERAL
In addition, the system
automatically deducts thirty
minutes where lunch breaks
are not recorded. While this
provides a default control, it
may not always reflect actual
break durations and could
affect the accuracy of flexi time
balances.
Collectively, these control
weaknesses increase the risk
of inaccurate flexi time records,
excessive debit balances and
unauthorised flexi leave. They
may also result in financial loss
to the PKC, particularly where
employees with significant debit
balances terminate their
employment and Payroll is
required to recover the
overpaid amount, which may
not always be fully recoverable.
18 6.3.1 No formal schedule is in place
for the periodic review of
policies and guidance. As a
result, number of documents
2 - Low Agreed action: 
An HR Policy Register is
already in place; however, the
process will be strengthened
and formalised to ensure
S Lawson,
Employment
Equality and Policy
Team Leader
Mar 2027
Page 67 of 92

Page 68

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 36 
PKC - GENERAL
have not been reviewed for
over five years.
This increases the risk that
policies and guidance become
outdated and that employees
and managers may rely on
inaccurate or obsolete
information. 
policies and supporting
guidance are subject to regular
review and monitoring. Policy
review status will be monitored
through the People & Culture
Team Leaders' meetings as a
standing agenda item. 
Agreed evidence:
Updated HR Policy Register. 
19 6.3.2 Pay guidelines are not
consistently updated following
annual changes to pay and
related arrangements. Some
reference links within the
guidelines have not been
maintained and are no longer
functional, including links to the
Scheduled Pay Periods
document. 
In addition, two guidance
documents reviewed continue
to refer to superseded service
names: ESC and CDS. 
This may reduce the
effectiveness of the guidance,
limit access to supporting
information and undermine
2 - Low Agreed action: 
A review will be undertaken of
the Overtime, Standby and
Callout Policy, Payroll FAQ and
associated payroll guidance
documents to remove outdated
references, correct broken links
and ensure links are made to
centrally maintained documents
where appropriate. This will
reduce the need for multiple
documents to be updated
following routine pay changes. 
Agreed evidence: 
Evidence of review including
correction of broken or outdated
links.  
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 68 of 92

Page 69

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 37 
PKC - GENERAL
confidence that users are
referring to accurate and up-to-
date information, even where
the refenced document remains
available elsewhere on ERIC. 
20 6.3.3 Policy and guidance reviews do
not consistently identify all
content requiring amendment
or removal. As a result,
outdated information may
remain within published
documentation despite reviews
having been undertaken. 
This increases the risk of
employees relying on
superseded documentation and
may create confusion regarding
current terms, conditions and
related arrangements.
2 - Low Agreed action: 
Strengthen review checks. 
Agreed evidence: 
Removal of obsolete references
and superseded documents. 
S Lawson,
Employment
Equality and Policy
Team Leader 
Dec 2026
21 6.3.4 During interviews and testing,
we were unable to identify a
designated officer or team with
overall responsibility for
monitoring compliance with the
Working Time Regulations and
overseeing related activities. As
4 - High Agreed action: 
Subsequent to the audit testing
period, a number of controls
have been introduced to
strengthen compliance with the
Working Time Regulations. 
These include an online opt-out
process, annual renewal
L Byrne,
HR Team Leader –
Payroll and Reward 
Mar 2027
Page 69 of 92

Page 70

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 38 
PKC - GENERAL
a result, there appeared to be
limited central oversight of
working hours, opt-out
agreements and associated
regulatory requirements. 
No opt-out agreements were
identified within the
Resourcelink records reviewed
during testing. This included an
employee whose average
working hours over a
seventeen-week period were
61 hours per week. Under the
Working Time Regulations, a
documented opt-out agreement
should be in place where
working patterns have the
potential to exceed an average
of 48 hours per week over the
relevant reference period
(seventeen weeks). Evidence
of such an arrangement was
not available within the record
examined. 
However, we acknowledge
that, subsequently to the audit
reminders via MyView,
manager communications
clarifying responsibilities for
monitoring working hours, and
development of a reporting
mechanism to identify
employees whose average
working hours exceed the 48-
hour limit over the 17-week
reference period. 
The Working Time Regulations
monitoring process will be
documented to formalise
ownership, reporting
arrangements and follow-up
activity where potential non-
compliance is identified. 
Agreed evidence: 
Copy of Manager
communication issued
regarding Working Time
Regulations responsibilities. 
Email triggers for annual
renewal. 
Working hours monitoring
report has been developed
covering the 17-week reference
period. Evidence of its ongoing
use. 
Page 70 of 92

Page 71

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 39 
PKC - GENERAL
testing period, steps were taken
by People and Culture Team to
strengthen the controls. In April
2026, an online opt-out form
was introduced, and
communication was issued to
employees regarding
completion and renewal
requirements. Managers were
also separately reminded of
their responsibilities. 
We further noted that MyView
reminders are now expected to
support annual renewal of opt-
out forms and that working
patterns will be reviewed where
an employee without an opt-out
agreement is identified as
exceeding the 48-hour average
limit. In addition, we were
advised that the updated
arrangements include a
dedicated reporting solution to
proactively identify such
employees.   
The Working Time Regulations
monitoring process
documented.
Page 71 of 92

Page 72

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 40 
PKC - GENERAL
22 6.3.5 Payroll reconciliations are
performed as part of each pay
cycle and include consistency
checks between payroll reports,
review of HMRC Gateway
statements, confirmation of
payments made, and spot
checks of PAYE and National
Insurance values reported
through Full Payment
Submission (FPS) and
Employer Payment Summary
(EPS) submissions. 
However, while individual
review activities are performed,
there is no routine documented
end-to-end numerical
reconciliation of the total PAYE
and National Insurance
amounts across all sources -
payroll reports, FPS and EPS
submissions (as applicable),
HMRC statements and
payments made to HMRC.
In our inquiry, we were advised
that review of HMRC
2 - Low Agreed action: 
Develop and implement a
documented monthly PAYE
and National Insurance
reconciliation process to
reconcile payroll reports,
FPS/EPS submissions, HMRC
Gateway statements and
payments made to HMRC. Any
variances identified will be
investigated, documented and
resolved as part of the
reconciliation process. 
Agreed evidence: 
Completed monthly PAYE and
National Insurance
reconciliation records, including
evidence of review,
investigation of variances
(where applicable) and sign-off.
A Craik, 
MyView and People
Analytics Team
Leader 
Mar 2027
Page 72 of 92

Page 73

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 41 
PKC - GENERAL
statements is considered
sufficient to identify any
outstanding amounts or
discrepancies and that any
variances arising would be
captured through existing
processes, for example,
through the HMRC Annual
Return spreadsheet. However,
assurance over the
completeness and accuracy of
reported amounts relies on a
combination of separate review
activities, rather than a single
documented reconciliation
across all key stages of the
payroll reporting and payment
process.
The control framework could be
strengthened by introducing a
documented monthly end-to-
end numerical reconciliation of
the total PAYE and National
Insurance amounts across
these sources, with any
variances identified,
investigated, documented and
Page 73 of 92

Page 74

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 42 
PKC - GENERAL
resolved. This would provide
clear evidence that reported
amounts are complete,
accurate and consistent.
23 6.3.6 An overpayment recovery
process is in place, and a draft
policy has been developed to
formalise the process.
However, as the policy has not
yet been approved, there is a
risk that the process may not be
applied consistently.
2 - Low Agreed action: 
Finalise and approve the
Overpayment Recovery Policy
to formally document existing
overpayment recovery
arrangements, responsibilities
and controls. 
Agreed evidence:
Publication of approved
Overpayment Policy. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Mar 2027
24 6.4.1 In certain services, there
appears to be a continued
reliance on overtime to support
routine operations. This is
inconsistent with the Overtime,
Standby and Callout Policy,
which states that employees
should not be required to
consistently work overtime. 
The pattern of overtime usage
suggests that it is being used to
address workforce resourcing
pressures. Audit testing
3 -
Medium
Agreed action one: 
Improve access to overtime
data and budget ownership
information.
Explored with Payroll how the
Organisation and Workforce
Change Team can directly
access additional payment
information and supporting
documentation to identify
budget holders and service
areas, recognising that
overtime costs are not always
G McCaw,
Organisational and
Workforce Change
Team Leader 
Completed 
Page 74 of 92

Page 75

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 43 
PKC - GENERAL
identified examples where
overtime was used over
extended periods to maintain
service delivery while
vacancies remained unfilled for
prolonged periods, indicating
resourcing pressures in certain
areas. 
Consideration should be given
to identifying further
opportunities to reduce reliance
on overtime in areas where it is
routinely used to support
service delivery, including
through measures aimed at
reducing the duration of
vacancies where appropriate. 
incurred within an employee's
substantive service. 
Agreed evidence one: 
Payroll Team Leader will
provide links to appropriate
payroll source folders by
07/08/2026. 
Agreed action two: 
Develop enhanced corporate
reporting on additional
payments.
Systems Team are developing
a Power BI report which will
provide a consolidated view of
both overtime and casual hours,
improving transparency and
supporting management
oversight. 
Agreed evidence two: 
Demonstration and
implementation of Power BI
reporting solution to highlight
total additional hours. 
Agreed action three:
Consider development of a 
G McCaw,
Organisational and
Workforce Change
Team Leader 
G McCaw, 
Dec 2026 
Dec 2026 
Page 75 of 92

Page 76

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 44 
PKC - GENERAL
forum to discuss
supplementary hours.
We will consider developing a
forum to discuss supplementary
hours if there is a sensible
alignment across services. 
Agreed evidence three: 
Evidence of overtime and
supplementary hours being
reviewed through operational
workforce discussions at the
new dedicated forum (or of
consideration of its
development). 
Agreed action four: 
Introduce monthly reviews of
longer-term solutions to
reduction of
overtime/supplementary
hours.
The Health and Social Care
Workforce Planning Manager,
Service Manager Brian Kinnear
and Organisational and
Workforce Change Team
Leader met to discuss longer-
term solutions to reduction of
overtime/supplementary hours
using the new early Power BI
Organisational and
Workforce Change
Team Leader 
G McCaw,
Organisational and
Workforce Change
Team Leader 
B Kinnear,
Service Manager
HSCP 
Z Musembya,
Health and Social
Care Workforce
Planning
Programme
Manager HSCP 
Dec 2026 
Page 76 of 92

Page 77

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 45 
PKC - GENERAL
data and will review monthly
when data is available to share
from the Systems Team. 
Agreed evidence four: 
Evidence of monthly reviews of
longer-term solutions to
reduction of
overtime/supplementary hours
using the new early Power BI
data. 
Agreed action five: 
Consider replication of a
Health workforce model in
Social Care.
We will consider a model being
developed in Health around a
nursing pipeline to see if it could
be replicated in Social Care.
This will be considered when
the SBAR to HSCP SMT is
approved (no date planned yet). 
Agreed evidence five:
Evidence of replication of a
Health workforce model in
Social Care (or of consideration
of its replication). 
G McCaw,
Organisational and
Workforce Change
Team Leader 
B Kinnear,
Service Manager
HSCP 
Z Musembya,
Health and Social
Care Workforce
Planning
Programme
Manager HSCP 
Dec 2026 
Page 77 of 92

Page 78

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 46 
PKC - GENERAL
25 6.5 Not all relevant supporting
documents and
correspondence are
consistently retained within the
appropriate payroll EDMS
folders (for example, rotas,
authorising emails), reducing
the effectiveness of document
retention arrangements.
However, the records
requested during the audit were
subsequently made available. 
1 -
Minor
Agreed action: 
Payroll Team Leader will
remind colleagues of the
requirement to transfer
supporting documentation and
correspondence (authorising
emails and rotas) from generic
inbox to EDMS.  Whilst
supporting records are retained
and made available during the
audit, it is recognised that due
to the volume of payroll
transactions and the short
timescales involved, this can
lead to documents not being
transferred to EDMS. 
Automation and digital process
improvements will remove the
need for authorised emails. 
Agreed evidence: 
Reminder of document
retention raised at the Payroll
Team Meeting (06/07/26).  Any
actions for Payroll will be
followed up in writing to the
Team once the Audit Report is
finalised. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 78 of 92

Page 79

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 47 
PKC - GENERAL
26 6.5 Inconsistent specimen
signature documentation was
identified for some sampled
authorisers. This included one
form that did not capture
personal details and a
previously completed form that
appeared to have been reused,
with previous details crossed
out and amended. This reduces
consistency in documentation
supporting authorisation
arrangements. 
1 -
Minor
Agreed action: 
Guidance will be issued to
managers reminding them of
their responsibilities regarding
authorised signatory
arrangements and the need to
ensure records remain up to
date. In parallel, Payroll and
MyView and People Analytics
(MVPA) will continue exploring
system-based authorisation
through MyView, which would
replace reliance on manual
signature verification and
provide a more sustainable
control environment.  
Agreed evidence: 
Evidence as detailed under
Action Point 3 (published
Manager Authorisation
Checklist and supporting
guidance available on Eric and
communicated to managers)
and evidence of exploration of
MyView claim approval
functionality as detailed under
Action 2. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 79 of 92

Page 80

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 48 
PKC - GENERAL
27 6.5 Craft Worker Overtime and
Standby Payment Claim Form
is not published online,
whereas forms for other
employee groups are available
online (Single Status and
Teachers). Access to forms and
supporting documents should
be standardised and consistent
across all employee groups,
regardless of size. Publishing
the form would improve
transparency and help reduce
delays in claim submissions.
Any risk of employees using an
incorrect form could be
mitigated through clear
labelling and guidance,
particularly as a dedicated Craft
employees’ website section
already exists. 
1 -
Minor
Agreed action: 
Publish the Craft Worker
Overtime and Standby Payment
Claim Form within the existing
Craft employee guidance
section. 
Agreed evidence: 
Relevant documents on Eric
under Craft Workers Section.
L Byrne,
HR Team Leader –
Payroll and Reward 
Completed 
28 6.5 The overtime approval
requirements within the
Overtime, Standby and Callout
Policy are not clearly defined. In
particular, it is not clear whether
references to approval relate to
prior authorisation of overtime
working, approval of claims for
payment, or both. 
1 -
Minor
Agreed action: 
The Overtime, Standby and
Callout Policy will be updated to
clarify the requirements for both
the authorisation of overtime
working and approval of
overtime claims for payment. 
Agreed evidence:
Revised policy published. 
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 80 of 92

Page 81

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 49 
PKC - GENERAL 
29 6.5 The Overtime, Standby and
Callout Policy does not clearly
state how “non-working days”
should be treated for overtime
payment purposes. Claim
forms distinguish between
“normal working days”,
“rest/free days” and “non-
working days”, however, the
policy refers only to the first two
categories. Clarifying this within
the policy would support
managerial understanding and
promote more consistent
authorisation of claims. 
1 -
Minor
Agreed action: 
Policy will be updated and will
be included in Manager
Guidance. 
Agreed evidence: 
Published Policy and Manager
Guidance as per Action Point 3.
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
30 6.5 We were advised that
documented procedures are
not considered necessary, as
additional payments are
processed in accordance with
the relevant policies, and
applicable pay elements are
configured within the
Resourcelink to apply the
appropriate enhancements.
Payroll staff apply these
arrangements based on claim
1 -
Minor
Agreed action: 
The Payroll Team will create a
“how to guide” for each service
area to flag key points that are
not necessarily recorded in
policy documents (internal
points only). 
Agreed evidence: 
Payroll processing guidance
notes and "how to" documents
L Byrne,
HR Team Leader –
Payroll and Reward 
Dec 2026
Page 81 of 92

Page 82

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 50 
PKC - GENERAL
form submissions and the
relevant policy criteria. 
However, consideration should
be given to documenting key
processing procedures to
support consistency,
knowledge retention, and a
common understanding of
claim processing requirements
across the team. 
completed and made available
to relevant payroll staff. 
31 6.5 We noted that, despite the
existence of the Craft Callout
pay element, no Craft callout
payments were identified within
the additional payments reports
during the period under review.
Payroll confirmed that the pay
element remains available for
use. Consideration should be
given to reviewing the ongoing
use of this pay element with the
relevant service. 
1 -
Minor
Agreed action: Will seek
confirmation from the service
whether this pay element is
required in future. 
Agreed evidence: 
Email communication between
Payroll and the Service.
R Cassels,
HR Officer - Payroll
Aug 2026
32 6.5 We identified instances where
work patterns recorded within
the Resourcelink did not align
with those reflected in claim
forms reviewed during testing.
The accuracy of these records
is the responsibility of
1 -
Minor
Agreed action: 
Introduce periodic
communications and guidance
to managers reminding them of
their responsibility to notify
HR/Payroll promptly of
A Craik, 
MyView and People
Analytics Team
Leader 
Dec 2026
Page 82 of 92

Page 83

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 51 
PKC - GENERAL
managers, who should ensure
that any relevant changes are
notified to HR on a timely basis.
Periodic verification of work
pattern information could also
be considered. 
contractual and working pattern
changes. 
Agreed evidence: 
Evidence as detailed under
Action Point 3 - published
Manager Authorisation
Checklist and supporting
guidance available on Eric and
communicated to managers. 
33 6.5 Delays by managers in
notifying Payroll of contractual
changes and leavers increase
the risk of payroll
overpayments. 
1 -
Minor
Agreed action: 
Introduce periodic
communications and guidance
to managers reminding them of
their responsibility to notify
HR/Payroll promptly of
contractual and working pattern
changes. 
Agreed evidence: 
Evidence as detailed under
Action Point 3 - published
Manager Authorisation
Checklist and supporting
guidance available on Eric and
communicated to managers. 
A Craik, 
MyView and People
Analytics Team
Leader 
Dec 2026
Page 83 of 92

Page 84

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 52 
PKC - GENERAL
11.  Authorisation 
11.1 The auditor for this assignment was K Tarnowska. The supervising auditor was
D Arachchilage. 
This report is authorised for issue:............. 
12.  Distribution 
12.1 This report has been distributed to: 
T Glen, Chief Executive
C Mailer, Depute Chief Executive 
G Boland, Strategic Lead, Strategic Planning, People and Performance
P Johnstone, People and Culture Manager, Human Resources
L Byrne, HR Team Leader – Payroll and Reward, Human Resources
A Craik, HR Systems Team Leader, Human Resources
All Strategic Leads
Committee Services
External Audit.  
Page 84 of 92

Page 85

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 53 
PKC - GENERAL
13.  Assessment Definitions 
13.1 The following table contains the definitions of the control objective assessment. 
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and control
exist, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in
the area audited.
Reasonable Assurance There is a generally sound system of governance, risk
management and control in place. Some issues, non-compliance
or scope for improvement were identified which may put at risk
the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk
management and control to effectively manage risks to the
achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control is inadequate to
effectively manage risks to the achievement of objectives in the
area audited. 
13.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions. 
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations/ major concerns which require
immediate action. Management will need to add these to the
appropriate Service risk register.
Issue represents a control weakness which could cause, or is
causing, severe disruption of the process or severe adverse
effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of key
controls requiring urgent action. Management should consider
adding these to the appropriate Service/ divisional risk register
Issue represents a control weakness which could have, or is
having, major adverse effect on the ability to achieve process
objectives
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should consider
these when updating any divisional / team risk registers.
Page 85 of 92

Page 86

Fd7c5c68-15cf-4193-85f0-0816a20cc25f.Docx4 54 
PKC - GENERAL
Issue represents a control weakness which could have, or is
having, significant adverse effect on the ability to achieve process
objectives
2 Low Minor observations regarding the adequacy of controls which
require action to improve the efficiency, effectiveness, or
economy of operations or which otherwise require to be brought
to the attention of Senior Management
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process objectives
1 Trivial / Minor Very minor observations which will be raised during the audit and
may not be included within the final report
Issue represents a very minor control weakness with negligible
impact on the ability to achieve process objectives. The issue will
be raised during the audit and may not be included within the final
report. 
Page 86 of 92

Page 87

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 21 September 2026 
Report Title: National Fraud Initiative Outcomes 2024/25 and
Preparations 2026/27 
Report Number: 26/257 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to present the reported findings of the 2024/25
National Fraud Initiative (NFI) exercise. It also outlines the preparations
currently underway in respect of the 2026/27 exercise. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Progress Update
5. Outcome from Consultancy Work
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendation 
It is recommended that the Audit and Risk Committee: 
2.1 notes the outcomes as reported within the national Audit Scotland report of
the National Fraud Initiative 2024/25; and 
2.2 notes the work undertaken within the Council in preparation for the 2026/27
exercise. 
2.3 approves the section of Audit Scotland’s self-appraisal checklist relating to
those charged with governance at Appendix A.
8
Page 87 of 92

Page 88

3. Background/Context 
3.1  The National Fraud Initiative (NFI) constitutes a sophisticated data matching
exercise matching electronic data within and between participating public
bodies to assist in the prevention and detection of fraud. The Cabinet Office is
responsible for the administration of the NFI in the UK. The NFI exercise in
Scotland is Audit Scotland’s data matching exercise that runs every two years
in line with the published timetable. The Cabinet Office processes the data for
the NFI in Scotland on behalf of Audit Scotland. This 2022/23 exercise
represents the eighth NFI data matching to be undertaken in Scotland. 
3.2 The overall aims of the NFI are to serve the public interest by safeguarding
public money against losses from fraud or misappropriation and to contribute
towards the fight against fraud. It improves the use made of public resources
by identifying anomalies in the data held by different authorities and by
ensuring that these are highlighted for further investigation. Whilst it is
designed to detect fraud, it may also identify instances of administration error
or inaccurate data. 
3.3 The NFI exercise helps participating bodies (such as Local Authorities, Police
Scotland, Scottish Fire and Rescue and the other public sector bodies) to
identify possible cases of fraud and detect and correct any consequential
under or overpayments. The NFI also helps Auditors in assessing the
Council’s arrangements for preventing, deterring and detecting fraud. 
3.4 There are broadly three stages in the NFI process: 
1. the submission of the required datasets by public authorities and other
organisations; 
2. the processing of the data (data matching) in order to identify anomalies;
and 
3. the investigation of the highlighted and reported anomalies 
3.5 The Council is responsible for stages 1 and 3; processing of the data (stage
2) is carried out under arrangements put in place by the Cabinet Office.
Reports on the Council’s involvement and responsibilities have previously
been presented to the Audit & Risk Committee. More recently, a report
highlighting the outcomes for Perth & Kinross was presented to the Audit &
Risk Committee in June 2026 (report 26/200). 
4. 2024/25 National Report 
4.1 The “outcomes” arising directly from the 2024/25 investigations, as reported in
Audit Scotland’s National Fraud Initiative in Scotland Report of August 2026,
are £21.7m, which is broadly similar to the outcomes from the 2022/23
outcomes, which were £21.5 million. 
4.2 The proportion of the figure attributable to Perth and Kinross Council is
£131,236, as reported previously to Audit & Risk Committee (report 264/200). 
Page 88 of 92

Page 89

5. 2026/27 Preparations 
5.1 Audit Scotland’s report provides a self-appraisal checklist which has been
completed for 2024/25 and actions identified in order to improve
arrangements are being taken forward. Part A of this checklist is entitled “for
those charged with governance” and is attached at Appendix 1 for approval by
the Audit & Risk Committee. 
5.2 Internal Audit is currently liaising with relevant contacts within Services
concerning 2026/27 requirements and will liaise with the Council’s external
auditors in due course. As part of preparations, any learning from outcomes
from previous NFI exercises will be considered. 
5.3 It is anticipated for 2026/27 as in previous exercises, that additional datasets
will be requested mid cycle e.g. Council Tax and Electoral Register data. 
5.4 Data protection legislation requires that individuals whose personal
information is to be provided for NFI purposes are informed. This is
undertaken by the provision of privacy notices. Internal Audit will facilitate the
processes whereby, where appropriate, data subjects are notified of the use
of their personal data in the exercise for preventing and detecting fraud. 
5.5 In addition, Internal Audit will support Services to ensure that the relevant
datasets are submitted in accordance with the NFI timetable. 
5.6 The proposed Council dataset submissions for 2026/27 are: 
Dataset Mandatory / Risk
Based
Privacy Notice
required?
Payroll Mandatory Yes
Pensions (provided by
Dundee City Council)
Mandatory Yes
Housing Tenants Mandatory Yes
Housing Waiting Lists Mandatory Yes
Licenses Mandatory Yes
Blue badges resident
parking (transport
passes and permits)
Mandatory Yes
Trade Creditors
(standing data)
Mandatory No (not personal data)
Trade Creditors
(payments data)
Mandatory No (Not personal data)
Council Tax Mandatory Yes
Council Tax Reduction
Scheme
Mandatory Yes
Business Grants Mandatory No (not personal data)
Personal Budget Mandatory Yes
Private Supported Care
Homes
Mandatory Yes 
Page 89 of 92

Page 90

5.7  A further mandatory dataset is the Electoral Register, however the Committee
has been informed previously that it is the opinion of the Strategic Lead for
Legal and Governance that the Council is not permitted to share this
information for the purposes of NFI. This opinion is being reviewed for the
current exercise and any changes will be reported to the Committee. 
5.8 A further update report will be presented to the Audit & Risk Committee in due
course 
6. Conclusion 
6.1 Perth & Kinross Council takes seriously its obligations for taking part in the
NFI exercise and the 2024/25 exercise is now fully complete. This report
outlines the reported findings from the 2024/25 National Fraud Initiative
exercise and the action being taken by Perth & Kinross Council in response to
the requirements of the National Fraud Initiative for 2026/27. 
7. Impact Value Assessment 
7.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
8. Appendices 
8.1 Appendix 1 - Part A of Audit Scotland’s Self-Assessment Checklist for those
charged with governance 
Page 90 of 92

Page 91

Appendix 1 Prepared by Audit Scotland | August 2026
National Fraud Initiative 
in Scotland
Self-appraisal checklist 
Part A: Is action Who by and
For those charged with governance Yes/no/partly required? when?
Leadership, commitment and communication
1. Are NFI participation and delivery
arrangement considered as part of
the wider fraud risk assessment
process?
Yes No 
2. Is the NFI an integral part of our
corporate policies and strategies for
preventing and detecting fraud and
error
Yes No 
3. Are we committed to NFI? Has the
council/board, audit committee and senior
management expressed support for the
exercise and has this been
communicated to relevant staff?
4. 
Partly Support for NFI
requested of the
Audit & Risk
Committee in this
paper 
Chief Internal
Auditor
September 2026
4. Does our Key Contact have
sufficient authority and time to
ensure that NFI is delivered
effectively? 
Yes No   
4. 5. Has the approach to follow up of
different NFI match types been clearly set
out and reported as part of the bodies NFI
planning process? 
Yes No   
5. 6. Does the approach to follow-up
optimise the use of available resources to
address risks and maximise savings?
Yes No 
6. 7. Are NFI progress and outcomes
reported regularly to senior management
and elected/board members (eg, the
audit committee or equivalent)? 
Yes No   
7. 8. Where we use a third-party provider
for matching and follow-up of council tax
single person discounts, and not the
NFI, have we considered sharing the
NFI matches with them?
N/a N/a   
8. 9. Do we review how frauds and errors
arose and use this information to improve
our internal controls? 
Yes No   
8
Page 91 of 92

Page 92

9. 10. Do we have access to suitably
qualified fraud investigation resources to
ensure suspected frauds can be
investigated thoroughly and promptly? 
Yes No 
11. Do we publish, as a deterrent,
internally and externally the
achievements of our fraud investigators
(eg, successful prosecutions)?
10. Not applicable 11. No  12.  
Source: Adapted from the Cabinet Office NFI web app 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
T: 0131 625 1500 E: info@audit.scot  
www.audit.scot 