Democracy Spraffa

Internal Audit - 25-11 Assessment and Charging

Perth and Kinross Council · 21 September 2026
Back to Audit and Risk Committee — 21 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
PKC - GENERAL 
Internal Audit Report
Finance & Business Support
25-11 Assessment & Charging 
September 2026 
Final Report
(Report No. 26/255) 
Legal and Governance
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH

Page 2

2 
PKC - GENERAL
25-11 Assessment & Charging
Contents by Section 
1. Introduction
2. Executive Summary         
3. Audit Background Information        
4. Scope and Limitations         
5. Assessment of the Control Environment      
6. Summary of Findings         
7. Conclusions          
8. Acknowledgement         
9. Action Implementation & Follow Up     
10. Authorisation
11. Distribution
12. Assessment Definitions

Page 3

3 
PKC - GENERAL
1.  Introduction 
1.1  The audit of Assessment & Charging was undertaken as part of the Internal
Audit plan for 2025/26, which was approved by the Audit & Performance
Committee on 25 June 2025. The period under review for the purposes of the
audit exercise was financial year 2025/26. 
1.2  The indicative scope for the audit was to review progress with the improvement
action plan.
1.3  This audit is not linked to the Strategic Risk Register; it is other assurance work.
1.4 Our review was limited to consideration of whether there is evidence that the
controls documented on the Service’s ‘Audit - Risk’ spreadsheet have been
implemented. 
2.  Executive Summary 
2.1  The audit has found that there is Substantial Assurance that the controls
documented on the Service’s ‘Audit - Risk’ spreadsheet have been
implemented. 
2.2  There are no actions arising from the findings in Section 6. 
3.  Audit Background Information 
3.1 Areas of concern around assessment and charging for Council-placed
residents in care homes and Council-supplied care at home were identified from
a 2016 Internal Audit report and extended follow-ups reported to the then Audit
Committee in 2018 and 2019, a 2018 Changing Point consultants’ report, along
with subsequent Internal Audit advisory activity which took place in 2023.
Responsibility for the Assessment and Charging function transferred from the
Health and Social Care Partnership to the Council’s Finance and Business
Support area in January 2024. 
3.2 On transfer to Finance and Business Support, to ensure that all aspects
highlighted historically by Internal Audit and by Changing Point are managed,
a spreadsheet of the areas of concern was prepared detailing risks and actions.
A review of the areas identified has been undertaken annually by the Service
Manager and Team Leader to identify if they are still relevant, how the risk is
being managed and if any areas have changed. Reviews were undertaken on
9 December 2024 and 24 October 2025 and recorded in the spreadsheet.

Page 4

4 
PKC - GENERAL
4.  Scope and Limitations 
4.1  The audit has considered the actions recorded and form an opinion on whether
the risks are being mitigated and/or managed.  
4.2 The Internal Audit consisted of reviewing the spreadsheet, identifying actions
and obtain evidence on a test basis of the actions being undertaken and
sustained.
4.3  The audit was limited to the review of the actions documented on the
spreadsheet and any questions arising from the review. This audit is not a
whole-scale review of all activity within Assessment & Charging. 
4.4 The details of the control objectives reviewed and the Internal Audit’s
assessment of their strength of control in each area are contained within
Section 5 of this report. 
5.  Assessment of the Control Environment 
5.1 The table below contains a summary of the number of findings and their ratings,
as detailed in Section 12, against each control objective, along with Internal
Audit’s assessment of the adequacy and effectiveness of the controls in place
to meet each of the objectives agreed for this audit. Further details, including
any improvement actions, are set out in the Management Action Plan. 
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1 To ensure that risks identified from the
areas of concern identified from the
report by Changing Point
consultants and previous audits by the
Internal Audit team have been
mitigated. 
No actions arising Substantial
Assurance 
5.2  The auditor has assessed that Substantial Assurance can be placed on controls
overall in relation to the progress with the improvement plan of Assessment and
Charging from the audit. Meaning:
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to support
the achievement of objectives in the area audited.
5.3  A summary of the key findings are provided in section 6. Please note, however,
the following areas of good practice which have been highlighted during the
audit:

Page 5

5 
PKC - GENERAL
5.4  The service has made substantial progress in completion of monthly
reconciliations; with all historical reconciliations now completed and monthly
reconciliations being maintained on an up-to-date basis. Regular reconciliations
provide assurance that transactions are accurately recorded, balances are
monitored, and any discrepancies are identified and investigated in a timely
manner. This has significantly reduced the risk of mismanagement of client
funds and strengthened the overall financial control environment.
5.5  The process for managing deceased client funds has improved with standard
forms (Microsoft forms) and a more formal approach to obtaining information
from next of kin or executors. This has helped ensure that deceased client
cases are dealt with more quickly and efficiently, reducing the risk of funds
being held by PKC for long periods and improving the timely return of deceased
client monies.
5.6  With reconciliations now up to date and calendar reminders in place,
outstanding bills can be identified quickly and paid on time. This helps ensure
that all payments are monitored regularly and any issues are actioned promptly. 
5.7 The Team Leader is content that an adequate team plan is in place and
appropriate induction, and training arrangements are being delivered for staff. 
5.8 We found that appropriate arrangements are in place to ensure care homes
and care-at-home providers are paid on time, and no significant payment delays
were identified during the audit. As per the Team Leader, care homes are paid
through the Independent Sector Payment (ISP) process on a four-weekly basis
using Mosaic and Integra systems, while care-at-home providers are paid
based on invoices submitted. 
5.9 The current arrangements for working with care homes and care-at-home
providers are effective, with regular meetings helping to resolve issues
promptly. Communication with social workers has also improved through
regular drop-in sessions, training, and ongoing engagement, supporting better
information sharing and joint working between teams. 
5.10 There is clear guidance provided for the staff to follow proper policies and
procedures. The audit did not identify any areas of non-compliance noticed
through the audit. 
5.11 Oversight and engagement from the Strategic Lead – Finance & Business
Support, Finance Manager, and Team Leader have improved significantly,
contributing to continued progress and improvement in this area. 
5.12 Internal Audit is satisfied that all previously identified concerns have been
effectively addressed and the team has implemented a range of improvements,
including completing all outstanding reconciliations, strengthening
management oversight, improving performance monitoring, reducing backlogs,
enhancing staff training, and improving communication with key stakeholders.
These actions have helped strengthen controls and improve the overall
effectiveness of the service.

Page 6

6 
PKC - GENERAL
6.  Summary of Findings 
6.1 Internal Audit has identified below areas where continues controls could be
beneficial particularly in relation to better performance. 
6.2 A reconciliation summary and action (checklists) are maintained and clearly
records the relevant reconciliation period, with comments such as "No action
required" or "No issues identified". We noted that reconciliations are being
completed on a monthly basis and are currently up to date. To support ongoing
effective control operation, management should continue this process
consistently, as it helps to identify any gaps, delays, or recurring issues with
client’s funds. 
6.3 While client’s bills are being paid on time, there are reasonable steps taken for
keeping supporting evidence for these payments. To improve transparency and
provide a clear audit trail, the team should continue to follow the proper
procedure to collect and retain as much supporting evidence as possible, such
as invoices, receipts, and correspondence relating to client payments. This
would help demonstrate that payments are accurate, appropriate, and properly
supported and no further audit action is considered necessary at this time. 
6.4 With diary alerts in place and reconciliations kept up to date, clients
approaching State Pension age can be identified promptly and the necessary
action taken to ensure they receive their pension when due. However, the diary
alert control was not operating consistently for the sample tested and cannot be
fully relied upon. Therefore, management should continue to implement robust
reconciliation to ensure all eligible clients are identified, and State Pension
applications are submitted promptly. No further audit action is considered
necessary at this time. 
6.5 Internal Audit also noted that resource pressures were historically a challenge
for the team. Since the move to Finance and Business Support, action to
address this through recruitment initiatives, including advertising and
restructuring activities has been undertaken. Given the actions already taken,
no further audit action is considered necessary at this time. 
7.  Conclusion 
7.1  The Internal Audit review is able to place Substantial Assurance on the overall
control environment for Assessment and Charging. The agreed actions, once
implemented, should enable Internal Audit to place Substantial assurance on
these.
8.  Acknowledgements 
8.1  Internal Audit would like to thank all officers who were involved in this audit,
particularly officers within the Assessment and Charging team, C Fraser, Team
Leader - Assessment & Charging.

Page 7

7 
PKC - GENERAL
9.  Action Implementation & Follow up 
9.1  Responsibility for the maintenance of adequate and effective controls rests with
management. Where the audit has identified areas for management action,
these are identified in the Management Action Plan. Where a decision is taken
by management not to act in response to finding from this review, it is the
responsibility of management to assess and accept the risk arising from non-
implementation. 
9.2  Achievement of the agreed actions is monitored through Internal Audit’s ‘follow
up’ arrangements. 
10. Authorisation 
10.1 The auditor for this assignment was M Stewart.  The supervising auditor was D
Arachchilage.
This report is authorised for issue by J Clark 
11.  Distribution 
11.1 This report has been distributed to:
T Glen, Chief Executive
C Mailer, Depute Chief Executive
S Walker, Strategic Lead, Finance & Business Support
C Robertson, Finance Manager/Business Partner 
L Simpson, Strategic Lead, Legal & Governance
Committee Services
External Audit

Page 8

8 
PKC - GENERAL
12.  Assessment Definitions 
12.1 The following table contains the definitions of the control objective assessment. 
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and control
exist, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in
the area audited.
Reasonable Assurance There is a generally sound system of governance, risk
management and control in place. Some issues, non-compliance
or scope for improvement were identified which may put at risk
the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk
management and control to effectively manage risks to the
achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control is inadequate to
effectively manage risks to the achievement of objectives in the
area audited. 
12.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions. 
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations/ major concerns which require
immediate action. Management will need to add these to the
appropriate Service risk register.
Issue represents a control weakness which could cause, or is
causing, severe disruption of the process or severe adverse
effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of key
controls requiring urgent action. Management should consider
adding these to the appropriate Service/ divisional risk register
Issue represents a control weakness which could have, or is
having, major adverse effect on the ability to achieve process
objectives
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should consider
these when updating any divisional / team risk registers

Page 9

9 
PKC - GENERAL
Issue represents a control weakness which could have, or is
having, significant adverse effect on the ability to achieve process
objectives
2 Low Minor observations regarding the adequacy of controls which
require action to improve the efficiency, effectiveness, or
economy of operations or which otherwise require to be brought
to the attention of Senior Management
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process objectives
1 Trivial / Minor Very minor observations which will be raised during the audit and
may not be included within the final report
Issue represents a very minor control weakness with negligible
impact on the ability to achieve process objectives. The issue will
be raised during the audit and may not be included within the final
report.