Agenda Document Pack - Audit and Risk Committee - 29/06/2026

Perth and Kinross Council · 29 June 2026
Back to Audit and Risk Committee — 29 June 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
22/06/2026 
A hybrid meeting of the Audit and Risk Committee will be held in the Council
Chamber on Monday, 29 June 2026 at 13:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive      
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor David Illingworth (Convener)
Councillor Bob Brawn (Vice-Convener)
Councillor Liz Barrett
Councillor Andy Chan
Councillor Ken Harvey
Councillor Iain MacPherson
Councillor Grant Stewart 
Page 1 of 314

Page 2

Page 2 of 314

Page 3

Audit and Risk Committee 
Monday, 29 June 2026 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF
CONDUCT. 
1 WELCOME AND APOLOGIES 
2 DECLARATIONS OF INTEREST 
3 MINUTE OF MEETING OF AUDIT AND RISK COMMITTEE OF 23
MARCH 2026 FOR APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 26/189) 
9 - 10 
5 UNAUDITED 2025/26 ANNUAL ACCOUNTS (DRAFT)
Report by Chief Finance Officer (copy herewith 26/190) 
11 - 140 
6 PERTH AND KINROSS COUNCIL BEST VALUE THEMATIC
WORK - ASSET MANAGEMENT
Report by Audit Scotland (copy herewith 26/191) 
141 - 168 
7 INTERNAL AUDIT FOLLOW UP
Report by Chief Internal Auditor (copy herewith 26/192) 
169 - 178 
8 INTERNAL AUDIT UPDATE
Report by Chief Internal Auditor (copy herewith 26/193) 
179 - 182 
9 INTERNAL AUDIT REPORT - 25-04 HEALTH AND SAFETY
(copy herewith 26/194) 
183 - 216 
10  INTERNAL AUDIT REPORT - 25-07 INSURANCE
(copy herewith 26/195) 
217 - 236 
11  INTERNAL AUDIT REPORT - 24-04 AFFORDABLE HOUSING
(copy herewith 26/196) 
237 - 254 
12  INTERNAL AUDIT ANNUAL REPORT AND INTERNAL AUDIT
OPINION 2025/26
Report by Chief Internal Auditor (copy herewith 26/197) 
255 - 260 
13  INTERNAL AUDIT MANDATE AND CHARTER  261 - 274
Page 3 of 314

Page 4

Report by Chief Internal Auditor (copy herewith 26/198) 
14  INTERNAL AUDIT STRATEGY AND PLAN 2026/27
Report by Chief Internal Auditor (copy herewith 26/199) 
275 - 280 
15  NATIONAL FRAUD INITIATIVE 2024/25 OUTCOMES
Report by Chief Internal Auditor (copy herewith 26/200) 
281 - 284 
16  STRATEGIC RISK ANNUAL REPORT
Report by Strategic Lead - Legal and Governance (copy herewith
26/201) 
285 - 314 
IT IS RECOMMENDED THAT THE PUBLIC AND PRESS SHOULD BE EXCLUDED
DURING CONSIDERATION OF THE FOLLOWING ITEM(S) IN ORDER TO AVOID
THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN TERMS OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973 
P1  STRATEGIC RISK ANNUAL REPORT - SR06 
P2  INTERNAL AUDIT FOLLOW UP - APPENDIX 2 - ACTIONS WITH
A COMPLETION DATE UP TO APRIL 2026 WHICH HAVE YET
TO BE COMPLETED
• Exempt Reason 6 - Information relating to the financial or business affairs of any
particular person (other than the authority).
• Exempt Reason 15 - The identity of a protected informant. 
P3  PARKDALE PROGRESS UPDATE
• Exempt Reason 15 - The identity of a protected informant. 
Page 4 of 314

Page 5

Audit and Risk Committee 
Minute of hybrid meeting of the Audit and Risk Committee held in the Council
Chambers on Monday 23 March 2026 at 1.00pm. 
Present: Councillors D Illingworth, B Brawn, A Chan, L Barrett, K Harvey, I
MacPherson and G Stewart. 
In Attendance: S Walker, Strategic Lead – Finance and Business Support; J
Ridgway and S Welch (Finance and Business Support); M Smith (Housing and
Communities); L Colledge (Customer and Digital Services); S Thompson (Health and
Social Care Partnership); J Clark, K Molley, A Brown and M Pasternak (Legal and
Governance). 
Also in Attendance: R Browne and P Bryan (Audit Scotland). 
Councillor D Illingworth, Convener, Presiding. 
1. Welcome and Apologies/Substitutions 
The Convener welcomed everyone to the meeting. 
2. Declarations of Interest 
There were no declarations of interest made in terms of the Councillors’ Code
of Conduct. 
3. Minute of Meeting of the Audit and Risk Committee of 1 December 2025
for Approval 
The minute of meeting of the Audit and Risk Committee of 1 December 2025
was submitted and approved as a correct record. 
4. Perth and Kinross Council Draft Annual Audit Plan 2025/26 
There was submitted a report by Audit Scotland (26/68) (1) providing an
overview of the planned scope and timing of the 2025/26 audit of Perth and Kinross
Council’s annual accounts and (2) outlining the audit work planned to meet the audit
requirements set out in auditing standards and the Code of Audit Practice, including
supplementary guidance. 
R Browne, Audit Scotland, provided a briefing summary of the report. 
Councillor L Barrett expressed that even though Audit Scotland are not in a
position to bring the audited accounts to committee in September for consideration,
she queried if Audit Scotland would be able to finalise work with Perth and Kinross
Council earlier as the delay in the audit could have an impact on budget preparations
for next year. R Browne confirmed Audit Scotland intend to finalise work earlier than
3
Page 5 of 314

Page 6

last year as they appreciate the pressures on the finance team ahead of the budget
setting process. 
The Convener referred to the best value audit that was due to be undertaken
early next year and queried if the audit would be reliant on the Local Government
Benchmarking Framework,  R Browne confirmed that controller of audit report on
best value and community planning would take account of  Audit’s Scotland
conclusions on Perth and Kinross Council’s performance management and
performance reporting arrangements, which the Local Government Benchmarking
Framework would form part of. 
Members thanked officers from Audit Scotland for their report. 
Resolved:
The contents of the Perth and Kinross Council Annal Audit Plan 2025/26 as
detailed in Report 26/68, be noted. 
5. Internal Audit Update 
There was submitted a report by Chief Internal Auditor (26/69) presenting a
summary of Internal Audit’s work undertaken as part of the Internal Audit Plans for
2024/25 and 2025/26. 
In response to a question from the Vice-Convener regarding the assurance
and advisory assignment in relation to the arrangements for disposal of 4 chalets at
Double Dykes Gypsy Travellers Site, J Clark confirmed that there are occasions
where senior managers request internal audit for a specific piece of investigative
work because of complaints or a degree of uncertainty and the service require
assurance that the activities being undertaken are appropriate. J Clark confirmed
there were a few minor areas for improvement around communication which would
be taken forward for future activity but advised that a separate audit report was not
required and the service were content with the outcomes. 
Resolved:
The progress with Internal Audit activity, be noted. 
6. Internal Audit – 25-09 Petty Cash 
There was submitted a report by Chief Internal Auditor (26/70) presenting an
audit undertaken on Petty Cash as part of the Internal Audit Plan for 2025-26, which
was approved by the Audit & Performance Committee in June 2025. 
Councillor L Barrett queried if officers had confidence that the implementation
of the new procedures would be completed by the end of the month.  S Walker
reassured members that the new procedures were in place and that the system should
go live the following week. S Walker advised that further communication would be
shared with colleagues involved in the process and ongoing training would be
Page 6 of 314

Page 7

provided. S Walker confirmed that the consistency of approach through the
consolation of finance should have a positive impact. 
In response to a question from the Convener, J Clark confirmed that the item
was included in the internal audit plan because of initial work that had been undertaken
within a social care establishment. J Clark added that there were areas that could have
had further impact across the Council and she had taken the decision to have a
standalone audit to look at the entirety of the control environment rather than just one
establishment. 
Members thanked J Clark, her team and other relevant officers for their work
on the audit. 
Resolved:
The contents of Report 26/70, be noted. 
7. Internal Audit – 25-05 Housing Regulator Submission 
There was submitted a report by Chief Internal Auditor (26/71) presenting an
audit undertaken on Housing Regulator Submission as part of the Internal Audit Plan
for 2025-26, which was approved by the Audit & Risk Committee in June 2025. 
The Vice-Convener referred to the issue of accessing properties and queried if
anything further could be done as the issue would continue to be raised throughout
future audits. M Smith confirmed that even though the team are very reluctant to do
so, provision had been put in place to enforce access to properties for safety checks,
if required. M Smith added that in terms of the safety elements, the team should be
able to achieve 100% but confirmed that the target may not have yet been met for a
specific period at time of reporting. 
The Vice-Convener referred to the gypsy/traveller sites, Double Dykes and
Bobbin Mill, and queried if following the replacement of the chalets and general
upgrades, if the Social Housing Charter Outcomes would be achieved long term. M
Smith confirmed that further information would be shared with members following the
meeting. 
The Convener queried if the interim target to address the Energy Efficiency
Standard for Social Housing (EESSH) failures of 114 properties in March 2026 was
expected to be achieved. M Smith confirmed that further information would be shared
with members following the meeting. 
Members thanked J Clark, her team and other relevant officers for their work
on the audit. 
Resolved:
The contents of Report 26/71, be noted. 
Page 7 of 314

Page 8

8. Internal Audit Follow Up 
There was submitted a report by Chief Internal Auditor (26/72) presenting
current summary of Internal Audit’s ‘follow up’ work relating to actions due for
completion up to September 2025. 
Resolved: 
The current position in respect of the agreed actions arising from Internal
Audit’s work, outlined in Appendix 1 to Report 26/72, be noted. 
IT WAS AGREED THAT THE PUBLIC AND PRESS SHOULD BE EXCLUDED
DURING CONSIDERATION OF THE FOLLOWING ITEM IN ORDER TO AVOID
THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN TERMS OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973 
P1. Internal Audit Follow Up – Appendix 2 
There was submitted a report by Chief Internal Auditor (26/72) presenting a
current summary of Internal Audit’s ‘follow up’ work relating to actions due for
completion up to September 2025 (Parkdale Care Home). 
Resolved:
The current position in respect of the agreed actions arising from Internal
Audit’s work, outlined in Appendix 2 to Report 26/72, be noted.
Page 8 of 314

Page 9

AUDIT AND RISKCOMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 26/189)
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
due
Action
Expected
10. 23 March 2026. 
Item 7.
IA - Housing
Regulator
Submission
Regarding the
gypsy/traveller
sites at Double
Dykes and Bobbin
Mill, information to
be shared with
members on the
replacement of the
chalets and
general upgrades
and if these would
long-term help
meet Social
Housing Charter
Outcomes. 
Information was sent to
members via email on 10
June 2026.
Elaine Ritchie Complete 29 June
2026
11. 23 March 2026.
Item 6. 
IA - Housing
Regulator
Submission
Information to be
shared with
members on the
interim target of
114 properties in
March 2026 to
address the
Energy Efficiency
Information was sent to
members via email on 10
June 2026.
Elaine Ritchie Complete 29 June
2026
4
Page 9 of 314

Page 10

No  Minute
Reference
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
due
Action
Expected
Standard for Social
Housing (EESSH)
failures and if
officers are
confident that the
target would be
achieved.
Page 10 of 314

Page 11

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit and Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: Unaudited 2025/26 Annual Accounts (Draft) 
Report Number: 26/190 
Report Author: Alison O’Brien, Corporate Accounting Manager
Scott Walker, Chief Finance Officer 
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________ 
1. Purpose 
1.1 This report presents the Council’s unaudited 2025/26 Annual Accounts (draft)
in accordance with the Local Authority Accounts (Scotland) Regulations 2014. 
2. Structure of the Report 
2.1 The information in the report is structured as follows – 
1. Purpose
2. Structure of the Report
3. Recommendations
4. Background
5. Annual Accounts
6. Final Outturns
7. Next Steps
8. Conclusion
9. Impact Value Assessment
10. Appendices 
3. Recommendations 
It is recommended that the Committee: 
3.1 Authorises the Chief Finance Officer to sign the unaudited 2025/26 Annual
Accounts – see paragraph 5.6. 
5
Page 11 of 314

Page 12

3.2 Notes that it is anticipated that the unsigned audited 2025/26 Annual
Accounts will be considered by the Audit & Risk Committee on 30 November
2026 – see paragraph 7.6. 
4. Background 
4.1 The Local Authority Accounts (Scotland) Regulations 2014 sets out the
following in respect of the unaudited Annual Accounts: 
(5)  The proper officer must ensure that financial statements give a true
and fair view of the financial position of the local authority and its group
at the end of the financial year and the transactions of the local
authority and its group for that year. 
(6)  Once the proper officer is satisfied as to the matters set out in
paragraph (5), the proper officer must certify these matters by signing
and dating the statement of responsibilities and the balance sheets
contained within the Annual Accounts and then submit the Annual
Accounts to the auditor. 
(7)  The Annual Accounts must be submitted to the auditor no later than 30
June immediately following the financial year to which the Annual
Accounts relate. 
(8)  The local authority must publish a copy of the Annual Accounts
submitted to the auditor, clearly identified as an unaudited version, on a
website of the authority from the date they are submitted until the date
on which the audited Annual Accounts are published in accordance
with regulation 11. 
(9)  A local authority or a committee of that authority whose remit includes
audit or governance functions must meet to consider the unaudited
Annual Accounts as submitted to the auditor. 
(10)  The meeting referred to in paragraph (9) must be held no later than 31
August immediately following the financial year to which the Annual
Accounts relate”. 
5. Annual Accounts 
5.1 The Annual Accounts are prepared in accordance with the 2025 CIPFA Code
of Practice on Local Authority Accounting (“the Code”). 
5.2 These accounts also comply with the Local Authority Accounts (Scotland)
Regulations 2014 which came into force in October 2014. 
Page 12 of 314

Page 13

5.3 The Annual Accounts include a Management Commentary, which provides
users of the financial statements with integrated information on management’s
view of performance, position and progress (including forward looking
information).  This is set out on pages 1 to 21 of the unaudited Annual
Accounts (draft) which are attached at Appendix 1. 
5.4 The Regulations require an annual review of the effectiveness of a local
authority’s system of internal control by Elected Members.  This requirement
was met with the approval of the Annual Governance Statement by the
Scrutiny Committee on 3 June 2026 (Report No. 26/158 refers).  The
Statement is set out from page 22 of the unaudited Annual Accounts (draft).  
5.5 The Regulations also require consideration of the unaudited Annual Accounts
by those charged with governance at a meeting to be held no later than 31
August.  This report (and the unaudited Annual Accounts (draft) attached at
Appendix 1) is before the Committee today to ensure compliance with the
statutory requirements prior to submitting them to the appointed auditor (Audit
Scotland) and making them available for public inspection. 
5.6 ACTION: Following consideration of the draft unaudited Annual Accounts the
Committee is asked to authorise the Chief Finance Officer to sign the
unaudited 2025/26 Annual Accounts. 
6. Final Outturns 
6.1 The 2025/26 final outturns were considered by the Finance and Resources
Committee on 24 June 2026 (Report No. 26/181 refers).  This was the fifth
report to the Committee on 2025/26 and included the unaudited final position
on the revenue and capital budgets. 
6.2 On completion on the unaudited 2025/26 Annual Accounts (draft), the level of
unearmarked Reserves was £17.790 million or 3.5% 
6.3 Furthermore, the level of earmarked Reserves included in the unaudited
2025/26 Annual Accounts (draft) is £43.143 million. 
7. Next Steps 
7.1 The audit of the Annual Accounts will take place between July and October
2026.   
7.2 Audit Scotland (supported by Council officers) will consider whether the
Annual Accounts: 
• Give a true and fair view, in accordance with applicable law and the
2025 Code, of the state of the affairs of Perth and Kinross Council and
its Group as at 31 March 2026 and of the income and expenditure for
the year then ended; 
Page 13 of 314

Page 14

• Have been properly prepared in accordance with International Financial
Reporting Standards (IFRS) as adopted by the European Union, as
interpreted and adapted by the 2025 Code; and 
• Have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973 and the Local Government in Scotland
Act 2003. 
7.3 The Companies Act requires auditors to give an explicit opinion on whether
the strategic report and governance statement have been prepared in
accordance with legal requirements.  Audit Scotland’s policy is to apply
Companies Act requirements on a best practice basis, and will include
opinions to the auditor’s report on whether the: 
• Management commentary has been prepared in accordance with
statutory guidance. 
• Annual Governance Statement has been prepared in accordance with
the proper practices set out in the good governance code. 
7.4 The results of the external audit will be summarised in the Draft Annual Audit
Report which incorporates the International Standard on Accounting (ISA)
260: Report to those Charged with Governance.   
7.5 The Council has been advised that the external audit report is not expected to
be available by 30 September 2026.  On that basis, it is anticipated that this
Audit Scotland report will be considered by the Audit and Risk Committee,
along with the unsigned audited 2025/26 Annual Accounts, at its meeting
scheduled for 30 November 2026. 
7.6 ACTION:  The Committee is asked to note that it is anticipated that the
unsigned audited 2025/26 Annual Accounts will be considered by the Audit
and Risk Committee on 30 November 2026. 
7.7 The unaudited 2025/26 Annual Accounts will be available for public inspection
between 1 July and 21 July 2026 (inclusive) with any objections being sent to
the auditor by 22 July 2026. 
8. Conclusions 
8.1 The unaudited 2025/26 Annual Accounts will be submitted to the Controller of
Audit by 30 June 2026 following authorisation by the Chief Finance Officer. 
Page 14 of 314

Page 15

9. Impact and Value Assessment 
9.1 This is an operational report, and as such, an impact and value assessment is
not required. 
10. Appendices 
• Appendix 1 – Unaudited 2025/26 Annual Accounts (draft) 
Page 15 of 314

Page 16

Page 16 of 314

Page 17

Corporate &
Democratic Services   
PERTH AND KINROSS COUNCIL 
ANNUAL ACCOUNTS 
2025/26 
UN-AUDITED  
5
Page 17 of 314

Page 18

Contents
Management Commentary ........................................................................................................................................................... 1
Annual Governance Statement .................................................................................................................................................. 22
Independent auditor’s report to the members of Perth and Kinross Council and the Accounts Commission (to follow) 28
The Financial Statements ........................................................................................................................................................... 31
Movement in Reserves Statement ........................................................................................................................................... 31
Comprehensive Income and Expenditure Statement ............................................................................................................... 32
Balance Sheet .......................................................................................................................................................................... 33
Cash Flow Statement ............................................................................................................................................................... 34
Statement of Responsibilities for the Annual Accounts ......................................................................................................... 35
Notes to the Financial Statements ............................................................................................................................................ 36
1. Accounting Policies .............................................................................................................................................................. 36
2. Accounting Standards that have been issued but have not been adopted ........................................................................... 46
3. Critical Judgements in Applying Accounting Policies ........................................................................................................... 46
4. Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty .................................................. 47
5. Adjustments between Accounting Basis and Funding Basis under Regulations .................................................................. 48
6. Expenditure and Funding Analysis ....................................................................................................................................... 49
7. Transfer (to)/from Earmarked Reserves ............................................................................................................................... 52
8. Other Operating Expenditure / Income ................................................................................................................................. 53
9. Financing and Investment Income and Expenditure ............................................................................................................. 54
10. Taxation and Non Specific Grant Income ........................................................................................................................... 54
11. Material Items of Income and Expense .............................................................................................................................. 54
12. Premiums and Discounts on Debt Rescheduling Written Down ......................................................................................... 54
13. General Grants, Bequests and Donations .......................................................................................................................... 54
14. Expenditure and Income Analysed by Nature .................................................................................................................... 55
15. Agency Services ................................................................................................................................................................. 55
16. External Audit Costs ........................................................................................................................................................... 56
17. Termination Benefits........................................................................................................................................................... 56
18. Post-Employment Benefits ................................................................................................................................................. 56
19. Related Parties ................................................................................................................................................................... 61
20. Leases ................................................................................................................................................................................ 62
21. Property. Plant and Equipment ........................................................................................................................................... 64
22. Heritage Assets .................................................................................................................................................................. 69
23. Investment Properties......................................................................................................................................................... 70
24. Intangible Assets ................................................................................................................................................................ 72
25. Assets Held for Sale ........................................................................................................................................................... 72
26. Long Term Debtors............................................................................................................................................................. 72
27. Inventories .......................................................................................................................................................................... 72
28. Debtors ............................................................................................................................................................................... 73
29. Creditors ............................................................................................................................................................................. 73
30. Provisions Other than Bad and Doubtful Debts .................................................................................................................. 73
31. Usable Reserves ................................................................................................................................................................ 74
32. Unusable Reserves ............................................................................................................................................................ 74
33. Impairment Losses ............................................................................................................................................................. 77
34. Grants ................................................................................................................................................................................. 77
35. Capital Expenditure and Capital Financing ......................................................................................................................... 78
36. Public Finance Initiatives and Similar Contracts ................................................................................................................. 78
37. Authorisation of Annual Accounts ....................................................................................................................................... 81
38. Contingent Liabilities .......................................................................................................................................................... 81
39. Financial Instruments ......................................................................................................................................................... 82
Page 18 of 314

Page 19

40. Devolved School Management (DSM) Schools .................................................................................................................. 87
41. Operating Activities............................................................................................................................................................. 87
42. Investing Activities .............................................................................................................................................................. 87
43. Financing Activities ............................................................................................................................................................. 87
44. Cash and Cash Equivalents ............................................................................................................................................... 88
45. Trust Funds ........................................................................................................................................................................ 88
46. The Statutory Loans Fund .................................................................................................................................................. 89
Housing Revenue Account Income and Expenditure Statement ............................................................................................ 91
Statement of Movements on the Housing Revenue Account Balance ..................................................................................... 92
The Accompanying Notes to the Housing Revenue Account Income and Expenditure Statement .......................................... 93
Council Tax Income Account ..................................................................................................................................................... 94
The Accompanying Notes to the Council Tax Income Account ................................................................................................ 95
Non-Domestic Rate Income Account ........................................................................................................................................ 96
The Accompanying Notes to the Non-Domestic Rate Income Account .................................................................................... 97
Charitable Trusts ........................................................................................................................................................................ 98
Common Good ............................................................................................................................................................................ 99
The Accompanying Notes to the Common Good Accounts.................................................................................................... 100
Group Accounts ........................................................................................................................................................................ 101
Group Movement in Reserves Statement............................................................................................................................... 101
Group Comprehensive Income and Expenditure Statement .................................................................................................. 102
Group Balance Sheet ............................................................................................................................................................. 103
Group Cash Flow Statement .................................................................................................................................................. 104
Reconciliation of the Single Entity Deficit for the Year to the Group Deficit ............................................................................ 105
Notes to the Group Accounts .................................................................................................................................................. 106
1. Combining Entities ............................................................................................................................................................. 106
2. Nature of Combination........................................................................................................................................................ 107
3. Financial Impact of Consolidation and Going Concern ....................................................................................................... 107
4. Group Comprehensive Income and Expenditure Statement – Financing and Investment Income and Expenditure .......... 107
5. Group Balance Sheet – Investments .................................................................................................................................. 107
6. Group Balance Sheet – Short Term Debtors (net of provisions) ........................................................................................ 107
7. Group Balance Sheet – Short Term Creditors .................................................................................................................... 108
8. Group Balance Sheet – Pension Liability ........................................................................................................................... 108
9. Group Cash Flow Statement .............................................................................................................................................. 108
10. Group Cash Flow – Investment Activities ......................................................................................................................... 108
11. Group Cash Flow – Financing Activities ........................................................................................................................... 108
Remuneration Report ............................................................................................................................................................... 109
Glossary .................................................................................................................................................................................... 119 
Page 19 of 314

Page 20

1 | Perth and Kinross Council Annual Accounts 2025/26 
Management Commentary
1. Introduction
These Annual Accounts contain the financial statements of Perth and Kinross Council and its group for the year ended 31 March
2026.
This management commentary outlines the key messages in relation to financial planning and performance for financial year
2025/26 and how this has supported delivery of the Council’s strategic objectives.  This commentary also looks forward,
outlining the future financial plans for the organisation and the challenges and risks which it will face as it strives to meet the
needs of the people of Perth and Kinross.
A glossary of terms is set out from page 119.
2. Who are we, our vision and priorities
The Council is situated in a central location in Scotland.  It covers a geographical area of around 5,286 km² and has an
estimated population of 154,420 (2024 mid-year estimate).  Between 2001 and 2024, the population of Perth and Kinross
increased by 14.4% (Scotland 9.5%).  This is the 7th highest percentage change out of the 32 council areas in Scotland.  The
latest population projections (2022) indicate that between 2022 and 2032, the population of Perth and Kinross is projected to
increase from 151,130 to 161,688.  This is an increase of 7.0%, which compares to a projected increase of 4.4% for Scotland as
a whole. 
Like all councils, external factors such as inflationary pressures facing households in recent years has only added to the
increasingly complex challenges we face, against a backdrop of the most testing financial circumstances local government has
ever experienced.  This means that it will be impossible to continue doing the same things we have done in the past and we are
rethinking how we work with, and within, our communities and with all of our partners to achieve the best outcomes for the
people of Perth and Kinross.
The current Corporate Plan 2022–2027, approved in December 2022, sets out a vision for “a Perth and Kinross where everyone
can live life well, free from poverty and inequality”.  It sets out the Council’s corporate outcomes which are aligned with its
organisational values and designed to address or mitigate the impact of the many challenges the Council and its communities
are facing both now and in the future.  We are committed to working in partnership and better engaging with people and
communities to ensure that they are involved and can have their say on where the Council must focus time and resources.
The strategic outcomes are underpinned by seven key priorities, aimed to address or mitigate the challenges, focus our work
where it is needed most, and support the delivery of our vision: 
• Tackling poverty 
• Tackling climate change and supporting sustainable places 
• Developing a resilient, stronger and greener local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people 
• Supporting and promoting physical and mental wellbeing 
• Working in partnership with our communities – which is woven through all of the key priorities above.
The priorities incorporate the careful consideration of the feedback received from our communities, elected members, partners
and staff about what is important for Perth and Kinross.  They are also evidence-based and reflect the areas of greatest need
and those that we can most directly influence in our work. 
Importantly, the Corporate Plan sets the strategic direction for the Council and will act as a guide when making difficult decisions
around where to invest funding and resources to support their achievement and ensure we have the greatest impact. 
The Plan is not designed to stand alone but is supported and strengthened by a wider strategic framework which overarches
several areas of work all designed to contribute to our vision and outcomes.  It connects the vision of the Council and its
partners to the detailed plans that guide the delivery of our services. 
This framework ensures that all Council plans and strategies are driven by, and focused towards, the delivery of a single shared
vision for the area and our services, connecting everything we do.
1 | Perth and Kinross Annual Accounts 2025/26 Page 20 of 314

Page 21

2 | Perth and Kinross Council Annual Accounts 2025/26 
The main components of our Corporate Plan’s wider strategic framework are as follows: 
• The Local Outcome Improvement Plan (LOIP) sets out the actions that the Community Planning Partnership will take
to address inequality and improve outcomes across key areas.  The LOIP is currently being refreshed to focus on
three shared priorities – poverty, employability and health and wellbeing – enabling stronger alignment across
partners and a clearer focus of collective effort on the areas of greatest need.  This will support a more coordinated
and collaborative approach to tackling long-standing inequalities.
• The Transformation and Change Strategy is a five-year strategy which sets out our extensive transformation
programme, acting as enabler to deliver on our corporate priorities.  Delivery of the Transformation and Change
programme will be underpinned by our “one council”, no wrong door approach, including our organisational-wide
cultural and behavioural change programme.  This also sets out our clear commitment to fully embed our values of
Ambition, Compassion, and Integrity and work in partnership with communities to improve outcomes for all.
• The Financial Strategy, which details how we will address financial challenges, identifies thirteen principles to support
the sustainability of the Council both now and in the future.
• The People and Culture Strategy 2024-2028 sets out our commitment to the people in our teams and our
communities, to ensure we have capacity and people in the right places to deliver our vision.  It will support the
organisation to deliver a sustainable approach to workforce development, culture and behaviours and effective
workforce planning.  It underpins our transformation and change programmes to enable us to deliver the best public
services focussed on need and within available resources.
The Corporate Plan demonstrates our commitment to improving services, improving the quality of lives for people in Perth and
Kinross and making best use of our resources and funding.  We will continue to deliver effective and efficient services, delivering
best value through working collaboratively with our partners to deliver our shared outcomes
To achieve our vision, we have outlined clear outcomes, priorities, actions, and measurements of performance. which will
ensure we are held accountable, can report consistently, and remain focussed on the areas that matter to people in our
communities. 
While this is a five-year plan, we know that there will be things outwith our control that will change.  We will regularly review and
monitor our performance against each of the key priorities to ensure that they are still relevant and effectively contribute to our
vision, while also informing the development of our next Corporate Plan.
As part of this ongoing approach, work has commenced on the development of the Council’s next Corporate Plan, which will
take effect from 2027. This reflects the Council’s commitment to ensuring that its strategic direction remains current, responsive
and aligned to emerging national priorities, local need and the evolving financial context.  The development process will build on
evidence from performance reporting, benchmarking and engagement with communities, partners and elected members,
ensuring that future priorities and outcomes are clearly focused on prevention, addressing inequality and delivering long-term,
sustainable impact for Perth and Kinross.
3. The Annual Accounts 2025/26
The Annual Accounts report the financial performance of the Council.  Their main purpose is to demonstrate the stewardship of
public funds which have been entrusted to it for the delivery of the Council’s vision and strategic objectives.  The requirements
governing the format and content of the Council’s Annual Accounts are contained in the Code of Practice on Local Authority
Accounting in the United Kingdom 2025/26 (the 2025 Code).  The 2025/26 Annual Accounts have been prepared in accordance
with this Code.
4. The Financial Plan
To support the delivery of the strategic objectives during 2025/26, Perth and Kinross Council approved a balanced gross
revenue budget of £623.034 million for the General Fund (February 2025).  In addition, the Housing and Social Wellbeing
Committee approved a gross HRA revenue budget of £38.293 million for the Housing Revenue Account (January 2025).  
As part of its consistent approach to longer term financial planning, the Council has in place a Medium Term Financial Plan 
through to 2031/32 that was approved by Council in December 2025, a final Revenue Budget for 2026/27, and provisional
Revenue Budgets for 2027/28 and 2028/29 that were approved in February 2026.  The Council has also approved a Council Tax
Strategy through to 2028/29.  The HRA Budget was also updated in January 2026.  The Financial Strategy approved in June
2022 remains in place.
Councils need to account for their spending and income in a way which complies with the legislative requirements.  Most day to
day spending and income is recorded within the General Fund and the costs and income in relation to the management of our
housing stock are recorded within the Housing Revenue Account.
Key to the delivery of Council Services is investment in the assets which are used to deliver these services (including schools,
houses and transport infrastructure) and the utilisation of capital funding to stimulate development and regeneration in local
areas.  At the start of 2025/26 the Council budgeted for gross capital investment of £134.7 million on General Fund activities
and £22.1 million in respect of the Housing Revenue Account.  This expenditure is funded from borrowing, government grants,
other external contributions, capital receipts, revenue contributions and earmarked reserves.  The Council approved a new 6-
year delivery programme for 2026/27 to 2031/32 at its meeting on 4 March 2026. 
2 | Perth and Kinross Annual Accounts 2025/26 Page 21 of 314

Page 22

3 | Perth and Kinross Council Annual Accounts 2025/26 
5. Performance Management
Our Corporate Plan sets out our vision and seven strategic priorities for the period 2022-2027:
1. Tackling poverty
2. Tackling climate change and supporting sustainable places
3. Developing a resilient, stronger and greener local economy
4. Enabling our children and young people to achieve their full potential
5. Protecting and caring for our most vulnerable people
6. Supporting and promoting physical and mental wellbeing
7. Working in partnership with communities
The Corporate Plan sets out clear outcomes, actions and performance measures, which we can be held accountable for and
consistently report progress against.  Performance against priorities and actions within the Corporate Plan are detailed within
the Corporate Annual Performance Report (APR).
The Council has a statutory duty to publish performance information for comparison and benchmarking purposes to its citizens
and communities.  In meeting this duty, we actively participate in the Local Government Benchmarking Framework (LGBF). 
Following the national report being published and the majority of the last of the 2024/25 data being published by the
Improvement Services at the start of 2026, detailed individual services profiles with data comparing trends and ranks were
produced for all Strategic Leads to consider and identify any relevant improvements. 
For 2024/25, analysis is based on 110 LGBF indicators using recently published data (2024/25 unless stated otherwise)
available on the LGBF Dashboard.  Within this, there are 90 non-cost indicators (performance and satisfaction indicators), and
20 cost indicators.  Locally we do not rank cost indicators as reduced costs do not necessarily mean improved outcomes for
local communities. 
According to the LGBF national report, long term performance nationally remains positive with 66% of LGBF indicators
improving since the base year (2010), compared to 54% for PKC.  However, it should be noted that in the base year (2010) we
were considered a very high performing council compared to the national average.  Data from the most recent year shows that
nationally the rate of improvement (42%) slightly exceeds the rate of deterioration (39%), while for PKC, improvement (50%)
demonstrates a wider margin and exceeds deterioration (35%).
For PKC non-cost indicators (performance and satisfaction), the latest data shows a positive shift, with the proportion improving
increasing from 38% to 47% compared to the previous year, alongside a rise in those indicators remaining the same (from 9% to
16%) as detailed in the chart below. 
The Improvement Service rank all indicators in terms of their performance across the 32 Scottish local authorities, then consider
these in ranking groups, known as quartiles.  For PKC overall, 56% of indicators were in the top 2 quartiles and for non-cost
indicators 52% (performance) and 82% (satisfaction).  Looking at how PKC performance indicators sit within these quartiles
gives a sense of how PKC is performing in comparison to other local authorities.  However, it is necessary to consider that
legitimate variations in data will exist across councils due to local policy choices and demographic profiles. 
Performance Summary
The 2024/25 Annual Performance Report (APR) was considered by Scrutiny and Performance Committee on 17 September
2025 and by Council on 29 October 2025.  This report details the Council’s performance against our priorities for 2024/25, and
the full range of information is available online at PK Performs.  This includes the Council’s Annual Performance Report, Best
Value Thematic Management Report, case studies and links to further relevant information, such as the Local Government
Benchmarking Framework.
3 | Perth and Kinross Annual Accounts 2025/26 Page 22 of 314

Page 23

4 | Perth and Kinross Council Annual Accounts 2025/26 
The APR uses a series of 54 Key Performance Indicators (KPIs) and targets to measure performance over the reporting period. 
Performance against 2024/25 targets includes 18 areas where the target has been met or exceeded and 18 areas where the
target has not been met.  Further information is available at PK Performs. 
Out of the 54 indicators, 61% are moving in a favourable direction, 22% in an unfavourable direction, 9% remain static and 7%
are either not available or it’s not appropriate to make a comparison. 
KPI Overview
KPI Annual Change
Change since
last reporting
year is favourable
Change since last
reporting year is
unfavourable
Change since last
reporting year is
static
No data available to make
comparison
   N/A
33 12 5 4
KPI performance against target
Met or exceeded
target 
✔
Target
not met
✖
Target not
set 
24/25 Target set
but data not yet
available
Not appropriate to set
target
18 18 7 3 8 
The following graphs provide an overview of trends within the KPI data between 2023/24 and 2024/25, or the most recent year
available.  
Caution should be applied when interpreting this data, as trends will only be indicative of performance.  Trends should be
considered in the context of the current operating environment, challenges and whether we control, influence or are informed by
the data. 
4 | Perth and Kinross Annual Accounts 2025/26 Page 23 of 314

Page 24

5 | Perth and Kinross Council Annual Accounts 2025/26 
For 2024/25 a selection of performance outcomes are set out in the following table:
Tackling Poverty 
• Our Local Child Poverty Action Plan is a joint plan with NHS Tayside and sets out our ambitions to mitigate the impact
poverty has on our children.  In addition, the Anti-Poverty Task force has developed a tackling poverty strategy and
action plan to shift the focus from reactive to preventative work, whilst ensuring that the lived experience of those
dealing with poverty is central to this work.
• Perth and Kinross has made encouraging progress in reducing child poverty.  The local rate is now 3.8% below the
national average, nearly double the previous gap of 2%.  This improvement has raised the area’s ranking to 7th
nationally for lowest child poverty rates.  While these results are promising, data will be closely monitored over the
next two years to ensure the trend is sustained.
• A network of public, third sector, and community organisations collaborated to deliver holistic family support, focusing
on employability, income maximisation, and wellbeing.  Strategic efforts across all partner organisations supported
parents into work by providing access to affordable housing, transport and childcare and employability support. 
• Fuel use advice was provided to 1,638 households via SCARF in 2024/25.  This shows an apparent decline in
numbers but is due to the measure only reflecting Council-funded services, with other contributing services from
previous years (such as the Heat Project) being funded elsewhere. 
• We helped remove barriers to employment for parents by providing 3,229 childcare places across the public and
private sectors and funding 300 Strong Start places for 2-year-olds.
• In October 2024, our Welfare Rights and Welfare Fund teams won the Institute of Revenues, Rating and Valuation’s
Excellence in Social Inclusion Performance Award for Scotland, recognising their impactful work in prisons and
foodbanks across urban and rural communities.
• We generated £9.2 million in additional income for Perth and Kinross residents through the benefits system; this is a
£700k increase on last financial year and reflects stronger service promotion and improved follow-up efforts to better
track financial outcomes.
• The number of new affordable homes in Perth and Kinross (including new builds and buy-backs) has increased from
173 in 2023/24 to 264 in 2024/25, more than achieving our target of 210.
• In 2024/25, 564 tenants received £203,000 in financial assistance through our Tenancy Sustainment Fund (TSF),
helping them manage arrears and maintain stable housing.  The fund uses a flexible, person-centred approach to
ensure support reaches those who need it the most.
• Our rent collection strategy continues to deliver exceptional results, achieving an in-year collection rate of 100.17% in
2024/25, up from 99.15% the previous year.  This result, supported by a 53-week rent year, reflects the success of
our tenant-focused approach that balances financial rigour with personalised support.  At the same time, current and
gross rent arrears have both decreased from 2023/24 to 2024/25 by 1.56%, and 2.15% respectively.
• We continue to champion the Scottish Government’s Fair Work Action Plan by embedding fair work practices across
our own operations and encouraging local employers to do the same.  We ensure that all businesses receiving
Council grant funding pay the living wage to their employees and through our Futures for All Employer Recruitment
Incentive (ERI), we provided financial and employability support to 48 businesses – 20 in Perth and 28 in rural areas. 
5 | Perth and Kinross Annual Accounts 2025/26 Page 24 of 314

Page 25

6 | Perth and Kinross Council Annual Accounts 2025/26 
All participating employers paid the living wage to new recruits (except apprentices), with a focus on helping
individuals facing barriers to employment to access fair work opportunities.
Key areas for improvement: Better understand and capture the value of preventative spend and how funds are allocated to
develop a budgeting approach based on identified need and overall wellbeing.  Review actions contributing to ongoing
reduction in child poverty levels to identify and enhance the most effective interventions.  Expand Fast Online Referral
Tracking system referral pathways and deliver Support and Connect training to frontline staff and partners to provide a more
consistent and comprehensive support service.
Tackling climate change and supporting sustainable places 
• 440 properties were upgraded to meet the Energy Efficiency Standard for Social Housing (EESH) standards in
2024/25.  As of March 2025, 87% of properties meet EESH - a 5% improvement from the previous year. 
• A £6.5 million refurbishment began at the Double Dykes Gypsy Traveller site in Perth, replacing existing chalets with
more energy efficient homes.  Five chalets were delivered by April 2025 with energy-efficient heating and hot water
systems and renewable technology.
• Over £3 million in grants were issued by March 2025 through the Home Energy Efficiency Programmes for Scotland
Area Based Schemes (HEEPS ABS) and ECO4 schemes to help private homeowners improve the energy efficiency
of their properties.
• Although the number of public charging devices for public access increased in 2024/25 it fell below the target.  A
significant contributor to this has been delays in the provision of external funding and we expect a substantial
increase in 2026, with the signing of a new contract for an additional 100 units over and above existing plans for
increased installations in 2025/26.
• In 2024/25 we planted 3,142 trees in our open spaces, an increase from 2,512 in 2023/24.  Tree planting boosts
carbon capture and contributes to climate resilience and flood mitigation.  16 Nature Restoration Fund grants were
awarded, covering 199ha of land.  These community-led projects focused on: controlling invasive species; riparian
habitat restoration; wildflower meadow creation; and the provision of tools and training. 
• Construction of the Comrie Flood Protection Scheme continues, following Council approval in November 2023.  It
remains on track for completion anticipated in Q4 2026 and within budget.  The South Kinross Flood Protection
Scheme was formally notified to the Scottish Government, with a Local Authority Hearing in 2025.  The Perth Surface
Water Flood Study nears completion and additional studies commenced in Bridge of Earn, Scone and Comrie. 
Further study and planning work is also underway in Blairgowrie and Rattray, Dunkeld and Craigie.
• We more than doubled our management of grassland areas included in Grow Wild, increasing from 49.16ha to
121.5ha.  Early monitoring has shown noticeable increases in insect and flower populations in unmown areas.
Key areas of improvement: Ensure we have a cleaner and greener Council fleet.  Develop local public transport solutions
which set the needs of residents and the environment as top priority.  Improved energy efficiency and reduction in carbon
emissions in the Council estate.  Increase provision of biodiversity sites. 
6 | Perth and Kinross Annual Accounts 2025/26 Page 25 of 314

Page 26

7 | Perth and Kinross Council Annual Accounts 2025/26 
Developing a resilient, stronger and greener local economy 
• We supported 252 business start-ups through Business Gateway, exceeding last year’s figures and surpassing our
New Start and Pre-Start Plus programme target with 22 businesses supported, in line with performance in Tayside as
a whole.  Perth and Kinross has led the Tayside region in Business Gateway Growth referrals, with 23 high-potential
businesses projecting turnover increases of £200k+, highlighting strong entrepreneurial momentum.  Tailored support
was provided to 254 micro-enterprises and 231 businesses participated in learning and networking sessions to
improve knowledge and highlight opportunities for joint working. 
• We launched a refreshed Invest in Perth website in October 2024, improving mobile responsiveness and accessibility,
resulting in a 24% increase in traffic over six months.  The Perth City and Towns platform grew to over 100,000 active
users, supporting local businesses and events through a multi-platform marketing strategy and targeted campaigns.
• The number of registered businesses in the energy sector grew from 140 to 145 and multiple enquiries are coming in
from other companies.  Land and accommodation constraints continue to limit our growth potential, but recently Perth
was ranked the 5th most sustainable city in the UK for business and first for renewable energy capacity per 100,000
people. 
• Whilst additional heat pumps were installed in 2024/25, low carbon heat consumption fell due to operational issues
with biomass boilers in 2 community campus facilities.  Production of electricity increased significantly due to the
installation of additional solar panels.  Historically these two factors have been reported together, which shows a
decrease in renewable energy generation.  In future these two elements will be reported separately as they operate
independently. 
• The percentage of businesses connected to gigabit broadband increased from 46% in 2023/24 to 55% in 2024/25,
exceeding 50% target.  We expect this to grow further, particularly in hard-to-reach premises through the Scottish
Government partnership with GoFibre. 
• We continued to position Perth and Kinross as a vibrant and distinctive destination for business, investment, and
tourism by leveraging our cultural identity, natural assets, and international recognition as a UNESCO City of Craft
and Folk Art.  We achieved a 25.1% increase in total visitor numbers, with day visitors up 21% and overnight stays up
21.6%, contributing to a 33% rise in direct visitor spend and a 37% increase in the sector’s overall economic impact.
• Visitor numbers to key cultural sites increased significantly, largely driven by the opening of Perth Museum.  Overall
numbers increased from 484,000 in 2023/24 to 765,000 in 2024/25. 
• We supported 618 adults to achieve learning outcomes – more than double our target of 300 – through SQA-
accredited courses and short programmes in communications, numeracy, digital skills employability, volunteering and
English for Speakers of Other Languages (ESOL). 
• Our Youth Employability Team registered 140 new young people and 122 completed support – 94% of whom moved
into a positive destination.  Staff are based in every secondary school in Perth and Kinross delivering one-to-one and
group support, and sector-based academies, and work closely with local employers.
Key areas for improvement: Unlock new investment in employment and housing land to support business growth in
foundational and key growth sectors.  Make Perth and Kinross a more competitive inward investment destination and
encourage investment for growth from existing businesses in foundational and key growth sectors.  Unlock private investment
7 | Perth and Kinross Annual Accounts 2025/26 Page 26 of 314

Page 27

8 | Perth and Kinross Council Annual Accounts 2025/26 
and expertise to support public and private energy projects.  Continue to grow visitor numbers for holidays and day trips. 
Further enhance our employability tracking and outreach capacity, supporting individuals in community settings.  
Enabling children and young people to achieve their full potential 
• Our Early Learning and Childcare settings outperformed both national and comparator benchmarks in all Care
Inspectorate Quality Indicators, reflecting the consistently high standards across Perth and Kinross.  In 2023/24, 4 out
of 5 of our primary school pupils met expected levels in numeracy and literacy.  This has increased from 78% from
last year and shows a steady increase each year since 2020/21. 
• We strengthened the use of data in school improvement planning.  The majority of schools now include actions to
reduce the Cost of the School Day in their Quality Improvement Plans for 2025/26 – ensuring equity is embedded in
everyday decision-making.
• A National Thematic Inspection by His Majesty’s Chief Inspector of Education reviewed how local authorities support
schools to improve.  The visit to Perth and Kinross found our advice and guidance to be clear and comprehensive,
with strong expectations set around standards and planning.  Our responsive, risk-based approach to providing
support and challenge to schools along with formal Quality Improvement Reviews were highlighted as good practice. 
Key strengths included: positive climate and ethos; effective data use; targeted use of Pupil Equity Funding (PEF);
and impactful programmes such as National Improving Writing and Numeracy Schools. 
• We continue to deliver on the Additional Support Needs (ASN) Transformation Programme.  Examples of work
include: the establishment of three additional Intensive Support Provisions (ISPs); consistent use of data (including
PowerBI) to record needs accurately and provide appropriate support; and using Career Progression Pathway models
to ensure staff are trained, skilled and confident.
• 45 schools and 3 ELC settings now hold a Digital Schools Award, an increase of over 50% on 2023/24.  Every school
now has a named Digital Champion.  Perth and Kinross had the second highest number of schools gaining Digital
Schools Awards during 2024/25.
• In 2023/24, 75.6% of P1 children met all expected developmental milestones – a decrease from 80.6% in the
previous year.  This is likely to be linked to the cohort being born during the COVID-19 pandemic, when early
supports were not available to families.  Public Health Scotland confirms a national increase in developmental
concerns at age 4-5 reviews.
• We’ve seen steady improvement in literacy attainment across P1, P4 and P7.  The gap between the most and least
deprived cohorts narrowed from 27% in 2020/21 to 21% in 2023/24.  Numeracy attainment has improved in both
cohorts, but at a slower rate for Scottish Index of Multiple Deprivation (SIMD) Q1 than for Q5.  As a result, the
poverty-related attainment gap widened slightly in 2023/24.  However, the long-term trend still shows progress, with
the gap narrowing from 24% in 2020/21 to 22% in 2023/24.
• Senior phase leaver data also shows significant progress.  The gap between SIMD Q1 and Q5 in achieving at least
one Level 6 qualification has reduced from 41% in 2021/22 to 28% in 2023/24 and the gap for at least one Level 5
qualification over the same period has narrowed from 28% to 19%.
• In 2023/24, 60% (12 out of 20) Looked After Children (LAC) pupils attained at least one SCQF Level 4 qualification,
below the national average of 72%, and attainment remains below that of all school leavers.  Care should be taken
when comparing these figures across years and cohorts due to the small numbers involved.  A sub-group of the
Raising Attainment Board has been established to focus on further improvements.
• Outcomes for our care-experienced learners are improving, with higher attainment in literacy and numeracy and more
young people entering positive destinations on leaving school (up from 82% in 2022/23 to 95% in 2023/24) – though
gaps remain compared to their peers.  The Staged Intervention Framework was implemented across ELC settings
8 | Perth and Kinross Annual Accounts 2025/26 Page 27 of 314

Page 28

9 | Perth and Kinross Council Annual Accounts 2025/26 
and schools, offering a clear structure to support learners who face barriers.  In September 2024, 39% of pupils
(6,973) were identified as having an Additional Support Need - up from 35% in 2022/23, and close to the national
average of 40%.
Key areas for improvement: Attainment at key milestones is raised for all children and young people.  Attendance rates
improve, particularly in the secondary sector.  Increase the number of young people going into positive destinations such as
work experience, further education, volunteering and employment.  Improved understanding of causes of attainment gap so
that effective interventions can be identified and implemented.  Improve support to children and young people with additional
support needs to realise their full potential.  Provide Kinship Carers with a range of supports to enable them to meet the
needs of children in their care. 
Protecting and caring for our most vulnerable people 
• In 2024/25 8,832 referrals were made to the Child Protection Duty Team – an increase of 9% from the previous year. 
This appears to be stabilising after increasing year on year post COVID-19.  All referrals are triaged within 24 hours,
with immediate action taken.  The Scottish Child Interview Model (SCIM), introduced across Tayside in May 2024, is
now well embedded in child protection processes.  This trauma-informed approach was used in 85% of all interviews
in 2024/25, ensuring children have the best possible opportunity to tell their story.  Cross-boundary working with
trained staff has strengthened consistency and access.
• The Child Protection Committee (CPC) launched its updated CPC Improvement Plan 2025 to 2028, supported by a
new strategy and schedule to guide self-evaluation activities.  Audits led by the Child Protection Interagency
Coordinator highlighted strong practices in relationship-based practice and rapid responses to risk.  Areas for
improvement include enhancing child and young people’s plans and better incorporating their views into decision-
making.
• 64% of people with intensive care needs received ‘care at home’, maintaining strong performance in line with the
Scottish average of 65%.  This reflects our continued commitment to helping people remain safely at home for as long
as they wish to do so.  97.6% of adults were discharged from hospital without delay, consistently meeting the national
target of fewer than 34.6 per 100,000 adults.  This was supported by a number of interventions which have reduced
unmet care needs by around 800 hours since August 2024.
• A Youth Housing Panel was established to support care-experienced young people who are moving into independent
living.  Meeting monthly, the panel matches individuals to suitable accommodation based on skills and needs, working
with partners including ROCK Trust and YMCA.  Around 10 care leavers are expected to benefit annually, with
consideration of extending this to other young people with complex needs.
• In response to the National Housing Emergency, we reduced average re-let times from 37.8 days in 2023/24 to 24.87
days in 2024/25 and cut the number of void properties from 136 to 95.  Improvements were achieved by deferring
non-essential upgrades, simplifying compliance checks, and offering flexible decoration options.
• Our Community Justice Service (CJS) participated in a Care Inspectorate self-evaluation focused on performance,
quality, and outcomes for individuals on community-based sentences.  Perth and Kinross received onsite validation
for the strength of its self-evaluation approach.  Keys strengths included a clear capacity for improvement,
demonstrated through targeted Strategic Needs and Assessments and alignment with the National Strategy for
Community Justice.  Areas for development included creating a Performance Framework and Dashboard, and a
Quality Assurance Framework.
Key areas for improvement: Take a partnership approach to the assessment of risk of significant harm to a child and
minimising and reducing risk through early support and assessment.  Enhance our housing support offer by implementing
an Intensive Housing Support Service for people with complex needs.  Where children cannot remain living at home, every
effort is made to keep them within their kin network.  Maintain significant relationships for care experienced children to
deliver on the principles of The Promise. 
9 | Perth and Kinross Annual Accounts 2025/26 Page 28 of 314

Page 29

10 | Perth and Kinross Council Annual Accounts 2025/26 
Supporting and promoting physical and mental wellbeing 
• The SCOPE Team has supported 367 people – an 8% increase since March 2024.  The team helps prevent hospital
admissions and there were no hospital admissions for people with Learning Disabilities since 2021.
• We supported Live Active Leisure staff to deliver evidence-based falls prevention classes.  These classes are based
on later life training, postural stability instructor training, and have been shown to be highly effective in reducing falls
among community dwelling older adults.  Over 2,000 Wellbeing Community Classes were delivered, supporting more
than 20,000 individual attendances.  Activities included chair-based social classes, social circuits, aqua
circuits/aerobics, and chair-based yoga.
• The risk of falls increases with age and given the growing older population in Perth and Kinross, higher admission
rates due to falls are to be expected.  This is reflected in the rate of 25 admissions per 1,000 people aged 65 and over
in Perth and Kinross, compared to 23 per 1,000 for Scotland.  Despite this, performance against this indicator remains
good, with a marginal improvement of 1.6% compared to last year.
• Seven parks and play areas were enhanced- in Bridge of Earn, Luncarty, Blairgowrie, Scotlandwell, Greenloaning and
Braco – with design development continuing for a further four in Perth and Crieff.  Each project was shaped through
community consultation to reflect local needs and aspirations.
• Between April 2024 and February 2025, 113 people were supported by local integrated care services to remain at
home and avoid crisis placements or hospital admissions service, helping shift the balance of care.  In Perth city, the
integrated hub is now fully established, enabling rapid, multi-disciplinary responses when health deteriorates.  Urgent
care Advanced Nurse Practitioners are working with locality teams to expand this model across the region.
• Our Community Alarm service handled 260,911 calls in 2024/25, with 99.26% answered within 60 seconds - up from
98.83% the previous year.  The service now supports over 3,900 clients and 12,000 devices, helping people stay safe
and independent at home.
• Waiting times for mental health services have increased from 39 weeks to 42.  We are working with partners to
improve access and reduce delays through better coordination and early intervention.
• Carers have a higher risk of financial exclusion.  In 2024/25, 847 unpaid carers were assisted by Citizens’ Advice,
mainly with debt and energy advice -a 40% increase from the previous year.  We’re working with partners and internal
teams to identify those in need and ensure they are signposted to appropriate support.
• Participation in extra-curricular sport activities has continued to rise, with 38% of secondary school pupils involved in
extra-curricular clubs – placing Perth and Kinross in the top three local authorities in Scotland.  Across the total school
roll participation levels have increased again to 43%, compared to 39% in 2022/23.
• Attendance at Live Active Leisure venues fluctuated due to the closure of Bells Sports Centre following flooding,
although figures did begin to recover in Q4 of 2024/25, with an increase of 25%.  Part of this will be due to the
opening of the new gym at the Dewars Centre.
Key areas for improvement: Improve health and wellbeing in Perth and Kinross by increasing overall participation in sport
and physical activity and promoting the wellbeing benefits of time spent in our natural surroundings.  Improve health and
wellbeing in Perth and Kinross by ensuring that people have access to wellbeing support when they need it. 
10 | Perth and Kinross Annual Accounts 2025/26 Page 29 of 314

Page 30

11 | Perth and Kinross Council Annual Accounts 2025/26 
Working in partnership with communities 
• We secured Fairer Futures funding support to scale up our multidisciplinary approach, appointing a programme
manager and recruiting a dedicated project team to lead delivery in new priority localities: Rattray, South Crieff, and
Muirton, alongside existing pilots in Letham, Highland, and Coupar Angus.
• We strengthened local coordination by consolidating Community Support and Enforcement services, with new
leadership roles enabling more effective collaboration between specialist and locality-based teams.  We also supported
a record 65 community groups—exceeding our target of 60—to establish Community Resilience Groups using
ringfenced Council funding, enhancing emergency preparedness and response, as demonstrated during recent severe
weather events.
• We acquired 20 residential properties in Dunkeld from the National Trust for Scotland (NTS), enabling 20 households to
transition into secure Council tenancies and increasing access to affordable housing in the area.  This involved working
closely with NTS and tenants to ensure a smooth transition, providing responsive support throughout the handover
process.  As part of the process, we introduced a local lettings policy that prioritises future allocations for individuals
with strong ties to the Dunkeld area, reinforcing our commitment to the principle of “local homes for local people.”
• The development of new chalets at Double Dykes – phased occupation of which began in May 2025 - represents part
of our wider investment in high-quality, culturally appropriate accommodation for Gypsy/Traveller communities.  We
introduced a resident-led engagement model shaped by direct feedback, including regular on-site sessions, digital
participation via Microsoft Teams, tailored newsletters, and real-time updates through noticeboards - strengthening trust
and empowering residents to play an active role in shaping their living environments.
• We continue to invest in community-led projects which support local residents to tackle issues, deliver services and
generally improve quality of life. £200k was invested through the Warm Welcome Initiative to more than 100 community
groups in the winter of 2024/25 to create warm and welcoming spaces, with a 34% increase in overall participation.  In
addition, £100k was allocated through participatory budgeting in identified localities to tackle socio-economic inequality,
with over 2,500 votes cast (23% increase from last year).  A further round of Community Investment Fund saw over
£326k invested in 115 different community-led projects across Perth and Kinross.
• We supported 118 volunteer groups who contributed 40,000 hours to enhancing greenspace management.  Despite
reduced funding, we provided insurance, training, materials, and, in some cases, financial support, helping enhance
local spaces and community pride.  We also consulted communities on the design of 11 play areas, receiving 486
responses.  Workshops with schools ensured children’s voices were heard, resulting in inclusive, multifunctional
designs that reflect local aspirations. 
• We launched our Leadership Competency Framework, setting out the actions and behaviours expected of all our teams
to help us deliver our organisational vision and strategic outcomes.  At the same time, we revised our leadership model
and introduced the Five Foundations of Leadership to support cultural change and improve how we engage with
residents. 
• We adopted a new Performance and Development Discussion (PDD) Framework making it mandatory for all staff in
early 2025.  It includes structured prompts to encourage meaningful conversations about delivering better outcomes for
people and communities.  All annual PDDs are recorded in our HR system to support analysis and future organisational
development planning.
Key areas for improvement: Scale up and roll out of Fairer Futures programme to Rattray, South Crieff, Muirton and North
Muirton.  Develop updated locality profiles to support a needs-based approach.  Support delivery of Business Improvement,
Culture and Behaviours and Workforce Planning workstreams of the Leadership Development Phase 2 Transformation
Project.  Implement the newly developed Leadership and Managers Induction toolkit.
For information about the Health and Social Care Partnership, please see the Perth and Kinross Integration Joint Board Annual
Accounts 2025/26 which are available at Perth and Kinross Integration Joint Board. 
11 | Perth and Kinross Annual Accounts 2025/26 Page 30 of 314

Page 31

12 | Perth and Kinross Council Annual Accounts 2025/26 
6. Financial Performance
Financial performance is part of the Council’s performance management culture with regular reporting during 2025/26 to elected
members at the Finance and Resources Committee.  This section summarises the main variances for 2025/26.
The Expenditure and Funding Analysis brings local authority performance reporting based on expenditure measured under
proper accounting practices, together with statutorily defined charges to the General Fund and Housing Revenue Account.  Both
the Comprehensive Income and Expenditure Statement and the Expenditure and Funding Analysis include a segmental
analysis which requires Councils to report performance based on how they are structured and how they operate, monitor and
manage financial performance.
The 2025 Code requires that Councils present the segmental analysis based on the organisational structure under which they
operate.  Additionally, the Code requires that if a local authority changes the presentation or classification of items in its financial
statements, the authority shall reclassify comparative amounts unless reclassification is impracticable. 
Although the Expenditure and Funding Analysis reflects the main variances, for operational reporting the Council’s
Comprehensive Income and Expenditure reflect proper accounting practice.  The Comprehensive Income and Expenditure
Statement movements are not directly comparable with the movements in the Expenditure and Funding analysis. 
a) General Fund Revenue Expenditure for 2025/26
In 2025/26 the Council incurred actual net expenditure on Services of £528.344 million (which is the Cost of Services disclosed
in the Comprehensive Income and Expenditure Statement on page 32).  When Taxation and Non-Specific Grant Income,
Financing and Investment Income and Expenditure and Other Operating Income and Expenditure are included there was a net
Deficit on the Provision of Services of £42.572 million.
The Expenditure and Funding Analysis information on pages 49 and 50 sets out adjustments between the net Deficit on the
Provision of Services of £42.572 million, included in the Comprehensive Income and Expenditure Statement, and the Use of
General Fund per CIES of £6.856 million in the table below.  The adjustments of £37.335 million represent the difference
between the net expenditure of the Council that is chargeable to taxation and rents and the figures reported in the
Comprehensive Income and Expenditure Account.  The deficit in the Expenditure and Funding Analysis is set out in the way in
which the Council organises itself and manages and reports on financial performance.
The following table sets out adjustments to the most recently approved Revenue Budget to ensure that budget and actual
figures are comparable.  These include the Public Finance Initiative, external income and capital accounting adjustments.  On a
comparable basis the table shows a net variance (under spend/additional income) of £13.022 million which is explained in
further detail.
12 | Perth and Kinross Annual Accounts 2025/26 Page 31 of 314

Page 32

13 | Perth and Kinross Council Annual Accounts 2025/26 
Updated
Budget per
Revenue
Monitoring
Report No.4
Virements
Capital
Accounting
Adjustments
Revised
Budget
Net Expend.
Charged to
the General
Fund and
HRA
Balances
per Expend.
and Funding
Analysis
Variance
£ '000 £ '000 £ '000 £ '000 £ '000 £ '000
COUNCIL SERVICES
Education and Learning 180,655 100 (346) 180,409 178,383 (2,026)
Children, Families and Justice 24,936 56 0 24,992 24,855 (137)
Economy, Development and Planning 15,709 882 0 16,591 15,766 (825)
Environment and Infrastructure 32,976 450 (3,459) 29,967 27,941 (2,026)
Housing and Communities 20,121 (1,144) (426) 18,551 17,709 (842)
Property Services 67,028 (90) (15,866) 51,072 49,602 (1,470)
Legal and Governance 4,176 14 0 4,190 3,960 (230)
Customer and Digital Services 13,403 63 0 13,466 11,983 (1,483)
Strategic Planning, People and Performance 5,821 20 0 5,841 5,218 (623)
Projects and Programmes 333 1 0 334 324 (10)
Finance and Business Support 11,623 (1,769) 0 9,854 9,074 (780)
Directorate Core Costs 1,093 (521) 0 572 572 0
Health and Social Care 111,176 118 0 111,294 109,914 (1,380)
Housing Revenue Account 0 (9,686) 0 (9,686) (9,686) 0
Valuation Joint Board 1,421 0 0 1,421 1,393 (28)
Non Distributed Costs 1,711 0 0 1,711 1,680 (31)
NET COST OF SERVICES 492,182 (11,506) (20,097) 460,579 448,688 (11,891)
Taxation and Non-Specific Grant (492,096) 3,567 0 (488,529) (487,859) 670
Finance / Investment / Other 14,836 8,573 20,097 43,506 44,408 902
Use of/(Increase in) General Fund per CIES 14,922 634 0 15,556 5,237 (10,319)
Contributions to/(from) other Reserves 4,956 (634) 0 4,322 1,619 (2,703)
Use of/(Increase in)  General Fund Balances 19,878 0 0 19,878 6,856 (13,022)
The actual contribution from the General Fund was £6.856 million.  This is £13.022 million less than planned and is made up
of additional income and service under spends, as well as adjustments for revenue grants, and is comparable with the revenue
monitoring positions that have been presented regularly to the Finance and Resources Committee throughout the financial year. 
The following section provides a summary of the significant variances.
Education and Learning delivered net under spends / additional income of £2.026 million.  The main reasons for this are:
• In respect of the Devolved School Management (DSM) Scheme there was a net underspend / additional income of
£542,000 reflecting savings on staff costs.  With regards the Pupil Equity Fund there was a net underspend of £103,000
because expenditure is incurred by academic year rather than financial year.  These resources will be carried forward by
schools into 2025/26.
13 | Perth and Kinross Annual Accounts 2025/26 Page 32 of 314

Page 33

14 | Perth and Kinross Council Annual Accounts 2025/26 
• Across the remaining non-devolved Education and Learning Services there was a net underspend / additional income of
£1.381 million.  This was achieved through a combination of additional staff slippage and home to school transport, partially
offset by overspends on residential schools.
In Children, Families and Justice there was a net underspend / additional income of £137,000.
Across Economy, Development and Planning there was a net underspend / additional income of £825,000.  The main
reasons for this were staff slippage in excess of budget, additional income and revenue grants, partially offset by landscaping
works.
In Environment and Infrastructure there was a net underspend / additional income of £2.026 million.  The main reasons for
this variance were additional income and savings on waste disposal and revenue grants.
In Housing and Communities there was a net underspend / additional income of £842,000 due to the receipt of revenue
grants.
In Property Services there was a net underspend / additional income of £1.470 million.  This was primarily due to savings on
energy and catering costs.
In Legal and Governance there was a net underspend / additional income of £230,000.
In Customer and Digital there was a net underspend / additional income of £1.483 million due to staff slippage, additional
income and revenue grants.
In Strategic Planning, People and Performance, there was a net underspend / additional income of £623,000 due primarily to
the accelerated delivery of approved savings and additional income.
In Finance and Business Support there was a net underspend / additional income of £780,000 due to staff slippage, the
accelerated delivery of approved savings and additional income.
In Taxation and Non-Specific Grant there was a reduction in net income of £670,000 due to reduced Council Tax receipts.
In Finance / Investment / Other there was an overspend of £902,000 due to an increase in borrowing costs partially offset by
additional income from Tayside Contracts.
General Fund and Housing Revenue Account Balances reduced by £6.856 million to £63.686 million in line with the budget
adjustments approved throughout the year by Council and the Finance and Resources Committee as well as recognising the
implications of final outturns and the implementation of the Service Concession Scheme.  When the Housing Revenue Account
Balance of £2.753 million and the earmarked Reserves of £43.143 million, that are set out on page 52 are excluded, this
leaves an uncommitted General Fund Balance of £17.790 million or 3.5% of the net 2025/26 Revenue Budget.
b) Composite Capital Budget and Housing Revenue Account Investment Programme 2025/26
A summary of the Council’s capital expenditure in 2025/26 is reflected within Note 35 to the Core Financial Statements on page
78.  Total gross capital expenditure was £137.527 million, comprising £44.349 million on the Council’s Housing Revenue
Account (HRA) and £93.178 million on the Council’s Composite (General Fund) Programme.  Several projects were completed
in the last year, with others currently on-site and making good progress during 2025/26.  The Council’s gross expenditure
includes:
• £17.327 million on various School Upgrades projects, including the replacement of Perth High School which opened
during the year, and various school refurbishments, including at Perth Academy, Perth Grammar and Methven Primary
School.
• £32.851 million on Roads and Transport projects, including Structural Maintenance, Road Safety measures, bridges
and the new link road at Bertha Park.
• £43.000 million on other works, including Flood Protection measures (£15.247 million); Commercial Property estate
(£2.325 million); Community and Greenspace projects (£1.171 million); and property, infrastructure and IT upgrades
(£17.240 million).  The balance of £7.017 million relates to expenditure on various waste initiatives, vehicles and other
miscellaneous works.
• £44.349 million on the HRA including Affordable Housing New Builds and Buy Backs (£20.768 million), upgrades to
Multi-Storey blocks (£4.336 million), Heating, Windows and Rewiring works (£5.814 million), Kitchen and Bathroom
Upgrades (£3.217 million) and Gypsy Site Improvements (£4.114 million). 
Capital expenditure is funded by borrowing, asset sales, grants, other capital receipts, and Revenue Budget contributions.  The
Capital Financing Requirement (CFR, i.e., the underlying requirement to borrow for capital purposes) as at 31 March 2026 was
£1,027.153 million.  Actual capital debt was £945.523 million, comprising long-term borrowing (£807.200 million) and a PPP
liability (£138.323 million).  The ratio of borrowing to the CFR for 2025/26 increased slightly to 92.1% (2024/25 92.0%).  During
the year the CFR increased by £94.370 million, reflecting the capital expenditure above, less capital receipts, grants and
contributions and principal loan repayments.  The CFR also includes a £2.746 million restatement adjustment at 31 March 2026
by applying the service concession flexibility scheme that was approved by the Council in February 2023.  The ratio of
borrowing to the CFR increased as a consequence of the new borrowing being undertaken, less amounts repaid in the year. 
14 | Perth and Kinross Annual Accounts 2025/26 Page 33 of 314

Page 34

15 | Perth and Kinross Council Annual Accounts 2025/26 
c) General Fund Reserves
As at 31 March 2026 the Council had uncommitted General Fund balances of £17.790 million which represented 3.5% of the
Council’s 2025/26 Revenue Budget approved in April 2025.  Council policy, as set out in the Reserves Strategy approved by
Council on 26 February 2025, is to retain uncommitted reserves of between 2% and 4% of net revenue expenditure over the
medium term.  The Council’s Reserves Strategy will continue to be reviewed, and updates will be considered by the Finance
and Resources Committee and the Council as part of the revenue monitoring cycle.  Full details of the Council’s General Fund
Reserves are shown on page 31 and page 74 of the Financial Statements, along with information on future commitments.
The Reserves position is summarised as follows: 
£m  £m
General Fund (60.933) Revaluation Reserve (377.955)
Housing Revenue Account (2.753) Capital Adjustments Account (286.189)
Capital Fund (39.469) Financial Instruments Adjustment Account 15.109
Insurance Fund (2.511) Pensions Reserve 17.753
Capital Receipts Reserve (1.506) Employee Statutory Adjustment Account 9.645
Capital Grants Unapplied (1.362)  
TOTAL USABLE RESERVES (108.534) TOTAL UNUSABLE RESERVES (621.637)      
TOTAL RESERVES (730.171)
The Balance Sheet
The Balance Sheet on page 33 summarises the Council’s assets and liabilities as at 31 March 2026 and explanatory notes are
provided from page 36.  Total net assets have increased by £474,000 to £730.171 million.  Long Term Assets increased by
£101.068 million, current assets reduced by £4.445 million, current liabilities increased by £80.484 million and long-term
liabilities increased by £15.665 million.  The major changes in the Council’s Balance Sheet between 31 March 2025 and 31
March 2026 are explained in more detail in the following paragraphs.
Long Term Assets 
The value of long term assets increased by £101.068 million due to the continuation of the major capital investment being
undertaken by the Council described above.  
Current Assets
The level of Short-Term Investments increased by £5.014 million and Cash or Cash Equivalents reduced by £7.086 million. 
This was the result of planned reduction of investments in recent years to fund the capital programme.  The reduction in cash
and cash equivalents follows the reduction in short-term deposits in line with cash flow requirements.
Current Liabilities
Short Term Borrowing increased by £93.344 million as a result of more Public Works Loan Board (PWLB) and short term
market borrowing falling due within 12 months of the balance sheet date compared to last year.  Short Term Creditors reduced
by £11.437 million primarily due to lower amounts payable to Scottish Government, Central Government, Other Local
Authorities, NHS Bodies and Other Entities. 
Long Term Liabilities
Long-Term Liabilities increased by £15.665 million due to an increase in Long Term Borrowing of £16.063 million from new
borrowing throughout the year, partially offset by a reduction in Other Long Term Liabilities of £2.111 million due to movements
in pension and public private partnership liabilities in line with the approved contract.
The Council’s annual Treasury Management Strategy outlines the Council’s policy in relation to borrowing and investment.  This
is prepared in accordance with the Code of Practice on Treasury Management in Local Authorities.  The majority of the Council’s
borrowing comes from the Public Works Loan Board and market loans.  Further details are provided at Note 39. 
Pensions Reserve
International Accounting Standard 19 Revised (IAS19R) requires the disclosure of the Council’s share of Tayside Pension
Fund’s assets and liabilities, both current and future.  The information disclosed in the accounts is provided to the Council by the
Pension Fund’s actuaries.  The position at 31 March 2026 indicates a net liability of £17.753 million compared to £18.533
million on 31 March 2025 due to changes in assumptions.  This liability is based on a snapshot valuation at 31 March 2026 and
is a result of prevailing market conditions at that date.  Triennial valuations of the Fund are carried out with the last valuation
having taken place at 31 March 2023.  Employer’s contributions were 17% of pensionable pay to 31 March 2024, reducing to
15.7% from 1 April 2024.  For more information see Note 18.
Provisions, Contingencies and Write Offs
The Council made provision for a number of eventualities which may have an effect on the financial position of the Council.  The
reasons for the provisions are outlined in Note 30 on page 73.
15 | Perth and Kinross Annual Accounts 2025/26 Page 34 of 314

Page 35

16 | Perth and Kinross Council Annual Accounts 2025/26 
There were a number of write-offs of debt and stock during the year which were approved by the Finance and Resources
Committee on 24 June 2026 – Authority to Write Off Debts and Obsolete Stock.
d) Accounting Ratios
The following financial indicators have been developed to provide an indication of the sustainability and affordability of the
Council’s financial plans.
FINANCIAL INDICATOR 2025/26 2024/25 PURPOSE
Uncommitted General Fund Reserve as a
proportion of Annual Budgeted Net
Expenditure
3.5% 4.0% Reflects the level of funding available to
manage financial risk / unplanned expenditure.
Movement in the Uncommitted General
Fund Balance
£(0.925)m £0.004m Reflects the movement in the level of Council’s 
has increased its Uncommitted General Fund
Reserve.
Council Tax – In Year Collection Rate 97.5% 97.3% Demonstrates the Council’s effectiveness in
collecting council tax debt.
Ratio of Council Tax Income to Overall
Level of Funding
21.5% 20.1% This reflects the Council’s capacity to vary
expenditure by raising Council Tax Income.
Capital Financing Requirement £1,027.153m £932.783m Measurement of requirement to borrow for
capital purposes.
External Debt Levels £945.523m £858.559m Actual borrowing for capital investment
purposes.
Capital Financing Requirement Ratio 92.1% 92.0% Measurement of prudence in relation to
borrowing levels – borrowing only to invest in
capital.  
Ratio of Financing Costs to Net Revenue
Stream
4.7% 3.9% Measurement of the Council’s ability to fund
borrowing costs. 
e) Financial Statements
The primary financial statements presented within the Annual Accounts are as follows:
• The Movement in Reserves Statement reports movements on the different Reserves held by the Council analysed into
Usable Reserves (i.e. those that can be applied to fund expenditure or reduce local taxation) and Unusable Reserves.  
• The Comprehensive Income and Expenditure Statement reports the accounting cost of providing services in accordance
with generally accepted accounting practices, rather than the amount to be funded from taxation.  Councils raise taxation to
cover expenditure in accordance with regulations which may be different from the accounting cost.  The taxation position is
shown in the Movement in Reserves Statement.
• The Balance Sheet brings together all the assets and liabilities of the Council.  It is a statement of the resources of the
Council and how they have been financed.  It is also a report on the Council’s financial position at a particular point in time
and represents a snapshot of its financial affairs at the close of the year expressed in accounting terms.
• The Cash Flow Statement summarises the inflows and outflows of cash and cash equivalents arising from transactions with
third parties on both day to day revenue transactions and capital activities.  Cash is defined for the purpose of this statement
as cash in hand and deposits repayable on demand less overdrafts repayable on demand.  Cash equivalents are
investments that mature in three months or less from the date of acquisition and that are readily convertible to known
amounts of cash with an insignificant risk of change in value.
The Code also requires the following to be included within the Annual Accounts:
• The Statement of Responsibilities for the Annual Accounts explains the responsibilities of the Council and of the Chief
Finance Officer as they relate to the Annual Accounts.
• The Notes to the Financial Statements provide further information on the above financial statements.
• The Notes include an Expenditure and Funding Analysis which compares the net expenditure that is chargeable to
taxation and rents and reconciles it to the Comprehensive Income and Expenditure Account.  The service analysis for both
the Expenditure and Funding Analysis and the Comprehensive Income and Expenditure Statement are now both provided in
the way in which the Council organises itself and manages financial performance.
• The Annual Governance Statement explains how the Council has complied with the Chartered Institute of Public Finance
and Accountancy (CIPFA) / Society of Local Authority Chief Executives (SOLACE) standard for good corporate governance
and meets the requirements of relevant legislation and current good practice.
• The Remuneration Report provides details of the Council’s remuneration of its senior councillors and senior officers with
regard to salary, taxable expenses and pension benefits and states how remuneration arrangements are managed.  The
report also provides information on exit packages agreed by the Council during the financial year.
16 | Perth and Kinross Annual Accounts 2025/26 Page 35 of 314

Page 36

17 | Perth and Kinross Council Annual Accounts 2025/26 
Supplementary Financial Statements
The supplementary financial statements are as follows:
• The Housing Revenue Account shows the major elements of housing revenue account expenditure and how these are
funded by rents and other income.
• The Council Tax Income Account reports the gross and net income from Council Tax, together with details of the number
of properties on which Council Tax is levied, and the charge per property.
• The Non-Domestic Rates Income Account shows the gross and net income from non-domestic rates and details the
amount payable to the national non-domestic pool and resulting net income for the financial year to the Council that is shown
in the Comprehensive Income and Expenditure Statement. 
• The Charitable Trusts statement includes the summary Income and Expenditure Account and Balance Sheet of those
Charitable Trusts and Endowments administered by the Council.
• The Common Good statement includes the summary Income and Expenditure Account and Balance Sheet for the Common
Good Funds administered by the Council.
• The Group Accounts incorporate the share of the Council’s Managed Funds, Subsidiaries and Associates into the Group
Movement in Reserves Statement, Group Comprehensive Income and Expenditure Statement, Group Balance Sheet, Group
Cash Flow Statement and include the Reconciliation of the Single Entity (Council) Surplus or Deficit for the year to the Group
Surplus or Deficit.
7. Financial Outlook, Risks and Plans for the Future
The financial and operating environment for local government continues to be characterised by sustained uncertainty,
increasing demand, and constrained resources.  These pressures are structural rather than short-term and are expected to
continue over the medium to long term.
Communities across Perth and Kinross continue to experience the ongoing effects of the increased cost-of-living, with
increasing levels of financial hardship and inequality.  Demand for support remains high, particularly in areas such as social
care, housing, and welfare advice.  At the same time, population change is reshaping both the type and volume of demand
placed on Council services.
Perth and Kinross is experiencing a significant demographic shift, with a rapidly growing older population and a
proportionately smaller working-age population.  This trend is expected to accelerate over the coming years.  The
implications are profound:
• increasing demand for health and social care services, including more complex and long-term care needs
• rising costs associated with supporting vulnerable adults and maintaining independence at home
• workforce pressures, as fewer working-age people are available to support service delivery
• reduced growth in the local tax base relative to demand pressures
These demographic changes are not unique to Perth and Kinross but are particularly acute in Scotland, where population
ageing is more advanced than in many other parts of the UK.
Alongside this, the Council continues to face significant financial challenges arising from the wider public sector funding
environment.  Real-terms reductions in core local government funding over a number of years, combined with increasing
reliance on ring-fenced or directed funding, limits local flexibility and places additional pressure on core services.  While
recent settlements have provided some stability in the short term, they have not kept pace with demand growth, inflationary
pressures, and policy commitments.
Cost pressures remain significant.  Although inflation has moderated from peak levels, the legacy impact continues to be felt
across energy, construction, and contract costs.  Pay settlements and workforce-related costs continue to represent a
substantial and growing proportion of expenditure.  In addition, national policy decisions—such as those relating to social
care, education, and environmental commitments—continue to add to cost pressures without always being fully funded in
the long term.
The Council is also operating within an increasingly complex risk environment.  The Corporate Risk Register highlights key
strategic risks including:
• the ability to meet statutory duties in protecting vulnerable children and adults
• the financial sustainability of services in the face of rising demand and constrained funding
• workforce capacity and resilience across key service areas
17 | Perth and Kinross Annual Accounts 2025/26 Page 36 of 314

Page 37

18 | Perth and Kinross Council Annual Accounts 2025/26 
• the impact of climate change, both in terms of mitigation requirements and the need to respond to more frequent
severe weather events
• digital, cyber, and data-related risks as services become more dependent on technology
Against this backdrop, the Council’s financial position remains extremely challenging.  The Medium Term Financial Plan
(MTFP), approved in December 2025, identified significant challenges over the planning period to 2031/32.  This reflects the
gap between projected available funding and the cost of maintaining current levels of service provision.
To address this, the Council has adopted a clear strategic approach based on three interdependent principles:
1. Prioritisation of Resources - resources will be increasingly targeted towards statutory duties, the most vulnerable in
our communities, and those areas that deliver the greatest impact against the Council’s strategic priorities.
2. Transformation and Service Redesign - the Council will accelerate its Transformation and Change Programme,
fundamentally redesigning how services are delivered.  This includes greater use of digital technology, including
artificial intelligence, service integration, demand management, and a stronger focus on prevention and early
intervention.
3. Financial Sustainability and Income Strategy - the Council Tax Strategy provides a degree of certainty over income
in the short to medium term and supports investment in priority areas such as social care, education, and children and
families services.  The Council will continue to explore additional income generation opportunities and ensure full cost
recovery where appropriate.
Delivering a balanced and sustainable budget over the medium term will require difficult decisions.  The scale of the
financial gap means that the Council must continue to:
• stop or reduce some non-essential activities
• redesign services to operate at lower cost
• increase productivity and efficiency through technology and new ways of working
• work more closely with partners, communities, and the third sector to deliver outcomes differently.
The Council’s Corporate Plan 2022–2027 continues to provide a clear strategic direction, with its vision of “a Perth and
Kinross where everyone can live life well, free from poverty and inequality.” The Plan’s priorities remain highly relevant in the
current environment, particularly in addressing poverty, improving wellbeing, supporting sustainable economic growth, and
tackling climate change.
The Financial Strategy supports this by linking long-term priorities with available financial resources, ensuring that decision-
making is evidence-based and focused on need rather than demand alone.  The integration of financial and service planning
through the MTFP enables the Council to take a more strategic and transparent approach to managing risk and allocating
resources.
In the Housing Revenue Account, the five-year Business Plan and Rent Strategy to 2030/31 provide a framework to maintain
and improve the Council’s housing stock while supporting the delivery of new homes.  The approved rent increase for
2025/26 reflects the need to balance affordability for tenants with the requirement to sustain investment in housing
infrastructure.
Looking ahead, the Council will need to continue to strengthen its financial resilience.  This will include maintaining
appropriate reserve levels, further improving financial forecasting, and enhancing its ability to respond to changing
circumstances.
In summary, the financial outlook for Perth and Kinross Council remains challenging, with demand for services continuing to
outstrip available resources.  The combination of demographic change, constrained funding, and increasing costs requires a
sustained and disciplined approach to financial management.  Through clear prioritisation, transformation of services, and a
continued focus on delivering outcomes that matter most to communities, the Council will seek to navigate these challenges
and maintain its long-term financial sustainability.
Transformation and Change
Perth and Kinross Council’s Transformation and Change Strategy, approved in June 2022, provided the framework for
reshaping how we deliver services so we can continue to improve outcomes for communities within increasingly constrained
resources.  Phase One of the programme was concluded in June 2024, with a new Phase Two (2024 – 26) establishing the new
Programme Management Office responsible for delivery, including strengthened governance, the embedding of service design
principles, and the initiation of major cross-cutting programmes.
During 2025/26, the Council has progressed delivery through Phase Two while also preparing for the transition into Phase Three
in June 2026.  This shift reflects the need to intensify transformation activity at scale and pace in response to the wider national
context of sustained financial pressures across local government, rising and more complex demand, and increasing
expectations of public services.  Our approach aligns with the Scottish Government’s direction by focusing transformation effort
on the areas that will deliver the greatest impact for Perth and Kinross, underpinned by our key corporate priorities. 
18 | Perth and Kinross Annual Accounts 2025/26 Page 37 of 314

Page 38

19 | Perth and Kinross Council Annual Accounts 2025/26 
Phase Three will begin implementation in June 2026 and strengthens our operating model for transformation and continuous
improvement.  This includes streamlining and prioritising the programme to ensure that resources are focused on the most
significant, outcome-driven change, and clarifying the distinction between large-scale transformation and proportionate business
improvement activity.  Governance arrangements will be reinforced to support clearer accountability, stronger oversight, and
faster delivery.
Audit Scotland’s Best Value thematic work on Transformation and Change in 2025 provided an external perspective on our
progress.  The audit recognised that the Council has a clear vision and plan for transformation, robust officer-led governance
through the Transformation Board, and good examples of working with partners and communities, supported by our user-
focused service design approach.  It also highlighted a small number of improvement actions that we have implemented to
strengthen delivery further, including: ensuring transformation plans are sufficiently ambitious to support long-term financial
sustainability and that projected savings are clearly articulated; confirming future programme management arrangements;
enhancing benefits realisation so we can demonstrate impact more consistently; and strengthening Equality and Fairness
Impact Assessment practice so potential impacts on vulnerable or protected groups are evidenced throughout project delivery.
These changes will help ensure that transformation continues to support financial sustainability, our key corporate priorities, cost
reduction, and more efficient and effective ways of working—while maintaining a clear focus on outcomes for the people of
Perth and Kinross.
Capital
The Council approved a revised 6-year Composite Capital Budget for 2026/27 – 2031/32 on 4 March 2026.  The Housing and
Social Wellbeing Committee approved the 5-year HRA Capital Budget for 2026/27 - 2030/31 on 21 January 2026.  Both these
Capital plans were subsequently updated by the Strategic Policy and Resources Committee on 22 April 2026. 
The Council’s Composite Capital Budget includes significant investment in improvements to roads and bridges infrastructure. 
Also included within the capital budget are major upgrades to schools and sports facilities in Perth, Kinross and Crieff, including
the replacement of Perth Leisure Pool.  In addition, there are ongoing works within the annual rolling programmes and road
network improvements.  Also included is a new primary school at Bertha Park, as well as various school refurbishments under
the Investment in the Learning Estate programme.  There is significant investment included in relation to new technologies,
including the ongoing development of the new Social Work database (Mosaic) and investment in the Microsoft Estate, as well as
the upgrading and replacement of School Audio Visual equipment and other Technology Upgrades.  Expenditure is ongoing in
relation to progressing various Flood Protection Schemes, with work on the construction of the Comrie Flood Protection
expected to be completed in the autumn of 2026.  There is also provision for economic development and planning initiatives,
parks and public spaces improvements, waste reduction and recycling and property improvements. 
The HRA Investment Programme 2026/27 to 2030/31 continues to focus upon increasing the affordable housing stock with the
provision of new affordable housing and Council house buy-backs, as well as the enhancement of the existing housing stock,
with works on multi-storey blocks, energy efficiency and external fabric maintenance.
The Capital Financing Requirement is estimated to peak at £1.357 billion in 2031/32 under current approved plans.  The annual
cost of servicing the borrowing and Public Private Partnership liabilities is being managed through the 1.25% annual increases
in Council Tax and the Capital Fund Strategy within the Medium-Term Financial Plan.  This ensures the Council’s plan remains
affordable, prudent and sustainable.
More detailed narrative on the Council’s capital investment plans, treasury management (borrowing and investments), prudential
indicators and loans fund liabilities can be found in the Council's Treasury and Investment Strategy and Prudential Indicators
2026/27 to 2031/32 report presented to Council on 25 February 2026.
Risk Management
Effective risk management remains a key element of the Council’s governance and internal control arrangements.  It supports
informed decision-making, helps the Council respond to an increasingly complex operating environment and underpins delivery
of sustainable outcomes for the communities of Perth and Kinross.  The risk management framework has been developed
based on best practice industry standards including the International Standard in Risk Management – ISO: 31000 and the Office
of Governance and Commerce (OGC) Management of Risk Guidance (MoR[1]) and guidance from the Association of Local
Authority Risk Managers (ALARM).
Within the Council there is a cohort of trained risk practitioners who provide technical guidance and support to ensure that a
consistent approach to risk management is taken across the whole organisation.
During 2025/26, the Council continued to strengthen its risk management arrangements, with a focus on improving the quality,
consistency and visibility of risk information.  This was supported by collaborative working between Risk Owners, the Strategic
Leadership Team and risk-trained officers, helping to strengthen oversight, challenge risk assessment and promote a more
consistent corporate approach across services.  PK Performs continued to be developed as the Council’s core risk management
system, alongside the introduction of enhanced reporting through a Strategic Risk Power BI dashboard.
The Council also benefited from collaborative working beyond the organisation through its involvement in the Tayside Risk
Management Group, which supports shared learning, benchmarking and continuous improvement. 
[1] M_O_R® is an industry standard methodology for Management of Risk which helps an organisation identify,
assess, and control risk at the strategic, programme, project and operational levels.
19 | Perth and Kinross Annual Accounts 2025/26 Page 38 of 314

Page 39

20 | Perth and Kinross Council Annual Accounts 2025/26 
The latest annual report and Strategic Risk Register was considered by the Audit and Risk Committee on 29 June 2026.
The Strategic Risk Register remains a live management tool and records the Council’s key strategic risks, the controls in place
and any further mitigating actions required.  Overall, the Council’s Risk Management Framework remains robust and effective
and continues to support good governance and delivery of the Council’s strategic objectives.
Workforce Management 
The Council values its employees, their skills, dedication, and passion to ensure it delivers essential services to the people,
businesses and communities of Perth and Kinross.  Our people continue to be our most important asset and remain at the heart
of everything we do. 
The Council continues its journey of transformation and change, reshaping our organisation to ensure that we are prepared to
deliver the best public services we can for the people of Perth and Kinross, focused on need and within available
resources.  Our workforce is fundamental to achieving this goal.  We recognise the importance of creating an environment in
which our people can be at their best.  We have a clear vision, aims and aspirations for our workforce, and bringing our people
on that journey remains essential to ensuring that our culture and ethos are future-ready to deliver public services.  
The Corporate Plan 2022-2027 sets out the key priorities and vision for the Council, including how we will approach the delivery
of services.  Our Transformation and Change Strategy recognises that, to achieve the Council’s ambitions, we need to reshape
our organisation, including its size and shape.  Our Financial Strategy recognises the unprecedented budget challenges and the
need for responsible decision-making in the context in which we work.  The People and Culture Strategy 2024-2028, approved
in June 2024, continues to be the enabler that supports our workforce as we reshape our organisation and deliver the best
public services we can.  During 2025/26, this has continued through implementation of the strategy and action plan alongside
the budget decisions agreed by Council in February 2025, providing an important context for workforce planning, service
redesign and the sustainable delivery of frontline services.  We continue to focus our efforts on what makes change a success –
our people – and have created learning and engagement opportunities to support our ambition for growth and change.  Our
People and Culture Strategy is based on our values of Ambition, Compassion and Integrity, providing direction not only on what
we need to do, but also why, where and how we should deliver now and in the future.  Our action plan sets out how we will
create a healthy and flexible workforce with the appropriate skills, values and behaviours to address current and future
demands.  This focus on workplace culture, performance, productivity, innovation, agility, digital technology, wellbeing, reward,
recognition and resilience remains key.  These commitments will enable the Council to match its ambition for transforming
services, growing the economy, reducing inequalities, protecting vulnerable people and supporting young people to be all they
can be.  
The Council is a diverse local authority, supporting both rural and urban communities.  We are committed to enhancing quality of
life, not just for the people we serve, but also for the people who make our achievements possible – our dedicated
employees.  We continue to operate within the context of changing service demand, financial pressures, an ageing population
and the need for a range of highly specialist skills and services.  Strong workforce planning, multi-disciplinary teams, integrated
working, locality-based decision-making, sound governance and effective performance monitoring continue to support delivery
of our ambition.  
We have implemented our executive leadership team, leadership competency framework and performance framework to focus
our contributions against Corporate Priorities.  This model embodies our vision and sets the cultural and leadership foundations
for how we will engage and operate with our communities in future.  During 2025/26, we have continued to embed these
arrangements across the wider leadership cohort, with our Evolving Leaders in Practice programme supporting year 2 of the
strategy and expanding key elements across the Council.  This creates further leadership development opportunities for all
leaders across the Council linking these to our established leadership competency framework.  Our redesigned operating model
continues to ensure that we work together to focus on positive outcomes for those we serve, implementing new ways of
working, optimising existing and new technology and working collaboratively with partners, Arm’s Length External Organisations
and other local authorities to create and adopt innovative approaches to service delivery.  Our Corporate Delivery Improvement
Plan continues to support improvement activity and, through annual performance reporting, Council approved the Annual
Performance Report for 2024/25 in October 2025, reinforcing scrutiny, accountability and continuous improvement across the
organisation. 
We continue to demonstrate the importance of inclusion by being a role model for initiatives such as Living Wage, Carer
Positive, Disability Confident, Young Person’s Guarantee and the Armed Forces Covenant.  These reflect the commitment we
make as an employer to support the different groups within our workforce and our communities.  Development and talent
management also enable us to provide versatile people solutions to support the future strategic direction of the
organisation.  We continue to invest in training and development opportunities for young people through Apprenticeship,
Graduate and Trainee programmes, helping to support skills development and future workforce capacity.  A focus on health,
wellbeing and resilience remains key to sustaining a healthy working environment and positive wellbeing culture, and we
continue to review and refresh the wide range of support we offer to our workforce.  The Council is proud to be a Fair Work
employer and continues to apply Fair Work principles, consulting and engaging with employees and trade union representatives
on improvements in our employment practices and arrangements.  During 2025/26, this has been supported by continued
progress on equality and inclusion, including publication of the Equality Mainstreaming Report 2025-2029, and by
implementation of the updated Real Living Wage rate from November 2025 as part of our ongoing commitment as an accredited
employer.  Equalities and fairness continue to be core principles in our People and Culture Strategy, helping to ensure we have
the right skills in the right place when we need them and contributing to our ambition of working together so everyone can live
life well. 
20 | Perth and Kinross Annual Accounts 2025/26 Page 39 of 314

Page 40

21 | Perth and Kinross Council Annual Accounts 2025/26 
8. Supplementary Information
a) Group Accounts
The Code of Practice on Local Authority Accounting in the United Kingdom requires the Council to produce group financial
statements where it has an interest in entities that meet the definition of a subsidiary, associate or joint venture.  The Group
results are presented alongside the results for the Council in the Annual Accounts.  Further details of the associated entities that
have been incorporated into the financial statements can be found on page 106.  
The Council has an interest in six organisations (detailed on page 106) that do not form part of the main Accounts.  The Council
includes the results of these organisations in its Group Accounts due to the significant influence it has over their financial and
operating practices.  The Council also includes Charitable Trusts administered and controlled by the Council and Common Good
Funds as managed funds within the Group Accounts.  
In accordance with the Code, the 2025/26 Group Accounts Statements are included on pages 101 to 105.  The basis for
consolidation is set out in the Notes to the Group Accounts Statements on pages 106 to 108.  The effect of consolidation is to
increase the Council’s net assets by £34.513 million resulting in a Group Balance Sheet showing net assets of £764.684
million at 31 March 2026 as set out on page 103.  
b) Common Good and Charitable Trust Funds 
Common Good Funds are administered by the local authority for the general benefit of the relevant communities.  Overall, the
Common Good Funds recorded an in-year surplus of £26,000 which, when applied to the surplus brought forward, results in an
accumulated revenue surplus as at 31 March 2026 of £2.551 million. 
Details of income and expenditure accounts and balance sheets can be found on pages 99 and 100 of the Annual Accounts. 
These funds are subject to similar accounting policies and procedures to those that are applied to the Council’s main accounts. 
The main source of income to Common Good Funds is rent.
The Council also administers several Charitable Trust Funds.  Details of income and expenditure accounts and balance sheets
can be found on page 98 of these Annual Accounts.  Overall, the Trust Funds recorded an in-year surplus of £276,000 which,
when applied to the surplus brought forward, results in an accumulated surplus as at 31 March 2026 of £4.057 million.
Perth and Kinross Council’s Trust Funds, for which the Council is the sole trustee, also have to prepare their own Trustees’
Annual Report and this is separately available on the Council website.
c) Public Private Partnerships / Design Build Finance Maintain
In September 2000 the Council entered into a 25-year PPP contract for the construction, maintenance and operation of office
accommodation and a car park.  In 2025/26 the Council paid £1.443 million up to September 2025 to the contractor under the
terms of the contract.  At the completion of the contract the Council purchased both assets.
Between 2009 and 2012 six school campuses were also brought into operation at Blairgowrie, Glenearn, Loch Leven,
Strathearn, North Inch and Breadalbane.  The contractor’s obligation was to construct the schools and is to maintain them to a
pre agreed standard.  In 2025/26 the Council paid £23.612 million to the contractor under the terms of the contract.  In addition,
the Council paid £3.351 million in relation to Bertha Park High School in 2025/26.
9. Conclusion
The Council has continued to demonstrate sound financial management in 2025/26 by continuing to deliver services
during challenging times with the resources which are available to it.  The pressures being experienced by Services in
relation to demand are known and plans are in place to mitigate them.  The Council is also facing significant inflationary
pressures.  These pressures have been reflected in budgets and the MTFP.  The commitment to a Council Tax Strategy
is a key component in addressing these challenges.
The Council will continue to face many challenges in the future from the combined effect of reduced resources,
increasing demands and expectations for our services.  It is confident that by working more creatively with all its
residents and partners, it will not only embrace these challenges but will maintain its performance and service delivery.
Acknowledgements
As in previous years, we would like to acknowledge the significant work of the finance teams in producing the Annual
Accounts and thank colleagues across the Council and the wider Group for their continuing support.     
Thomas Glen   Councillor Eric Drysdale   Scott Walker
Chief Executive  Leader of the Council  Chief Finance Officer
Perth and Kinross Council  Perth and Kinross Council  Perth and Kinross Council 
21 | Perth and Kinross Annual Accounts 2025/26 Page 40 of 314

Page 41

22 | Perth and Kinross Council Annual Accounts 2025/26 
Annual Governance Statement
1 Purpose
1.1 The purpose of the Annual Governance Statement is to give assurance to the people of Perth and Kinross, our elected
members, staff, partner agencies and other stakeholders that our governance arrangements are adequate and
effective and that our system of internal control is robust. 
2  Executive Summary 
2.1 The Council has undertaken a comprehensive and evidence-based review of its governance arrangements and system
of internal control for 2025/26.  This confirms that the Council’s  control environment is sound, well embedded and
operating effectively in practice.  The system of internal control provides reasonable assurance that risks are being
appropriately identified, managed and mitigated in support of the delivery of the Council’s strategic objectives,
recognising that absolute assurance cannot be achieved. 
2.2 The governance framework is aligned with recognised good practice, including the CIPFA  Delivering Good
Governance principles, and is supported by clear leadership, effective decision-making and scrutiny, and robust
financial and risk management arrangements.  Taken together with the formal assurance processes in place, this
provides a strong and consistent evidence base for overall assurance.  While targeted improvement actions have been
identified, these are being actively progressed through established service improvement, audit and transformation
programmes.  On that basis, the Council can provide clear assurance that its governance arrangements and system of
internal control are robust, proportionate and fit for purpose. 
2.3  The review of the effectiveness of the Council’s system of internal control and overall governance framework has been
informed by different sources assessing risk and providing assurance: -
• Executive Leadership Team / Strategic Leadership Team
• Chief Finance Officer
• Strategic Lead for Legal and Governance Services / Monitoring Officer
• Chief Internal Auditor / Internal Audit
• Data Protection Officer
• Policy and Governance Group
• External Audit 
• External agencies and inspectorates. 
3.  Scope of Responsibility
3.1 As well as providing assurance as to the effectiveness of the governance arrangements in place for the Council, this
Annual Governance Statement also covers the six organisations that are included in the Council’s Group Accounts.
• Live Active Leisure Limited (subsidiary)
• Perth Theatre and Concert Hall Limited (subsidiary)
• Culture Perth and Kinross Limited (subsidiary)
• Tayside Valuation Joint Board (associate) 
• Tayside Contracts (associate)
• Perth and Kinross Integration Joint Board (joint venture) 
4 Our Governance Framework
4.1  Our governance framework comprises our culture, values, rules, resources, systems, tools and processes which we
have in place to help us achieve our strategic objectives.  We recognise that the following are fundamental elements of
good governance within public sector organisations: -
• Leadership, Culture and Values
• Vision, Direction and Purpose
• Stakeholder Engagement
• Organisational Development
• Effective Decision Making
• Internal Controls
• Scrutiny and Accountability 
4.2  These fundamental elements of our governance framework reflect and seek to embed the principles of good
governance within the 2016 CIPFA Framework for Delivering Good Governance in Local Government, and with its
Addendum from May 2025, namely:
• Behaving with integrity, demonstrating strong commitment to ethical values and respecting the rule of law
• Defining outcomes in terms of sustainable economic, social and environmental benefits
• Ensuring openness and comprehensive stakeholder engagement
22 | Perth and Kinross Annual Accounts 2025/26 Page 41 of 314

Page 42

23 | Perth and Kinross Council Annual Accounts 2025/26 
• Developing the entity’s capacity, including the capability of its leadership and the individuals within it
• Determining the interventions necessary to optimise the achievement of the intended outcomes
• Managing risks and performance through robust internal control and strong public financial management
• Implementing good practices in transparency, reporting and audit to deliver effective accountability. 
4.3 A crucial part of the framework is the system of internal control which is designed to manage and mitigate risk in
relation to the achievement of our intended outcomes.
4.4 The Council manages risk through a continuous process of identification, assessment, evaluation, prioritisation and
mitigation.  We evaluate risk based on likelihood and impact in both financial and non-financial terms.  We do however
need to mitigate and manage risk proportionately; recognising that risk can never be eliminated completely and that
only reasonable assurance can ever be given.
5 Our Governance Arrangements 
5.1 Our culture and values are reflected in our behaviour and our decision-making.  Our policies, processes and
procedures including Elected Member and Employee Codes of Conduct, Whistleblowing and Anti-fraud and Corruption
policies, Elected Member Register of Interests, Gifts and Hospitality Policy and Conflicts of Interest procedures ensure
that, as a Council, we respect the rule of law, behave with integrity, promote a culture of good governance and
demonstrate a strong commitment to ethical values.
5.2 There are appropriate and effective arrangements in place for the discharge of the following statutory functions:
• Head of Paid Service 
• Monitoring Officer 
• Chief Finance Officer
• Chief Social Work Officer
• Data Protection Officer 
5.3 Following engagement with communities during the first year of the current political term, the Council has a Corporate
Plan which reflects its strategic priorities.  This has been supported by the Corporate Development Improvement Plan;
developed in 2023/24 to ensure that we deliver on those objectives and continue to provide high quality operational
services.  The Annual Performance Report for 2024/25, identifying key improvement activity for 2025/26, was reported
to Council in October 2025.
5.4 Strategic, operational and political leadership is an integral element of effective governance.  A formal programme of
induction for elected members is implemented following local government election – supported by learning and
development throughout the political tenure.  Similarly, an extensive leadership development programme is in place for
officers, with an established leadership competency framework in place to enhance capacity and effectiveness, not
only in senior leadership roles but across all levels of the organisation.
5.5 The operational leadership at a senior level is aligned to deliver on the strategic objectives and key priorities of the
Council.  As with many other public bodies, loss of skills and experiences across all portfolios and at senior leadership
level presents a continuing risk which the organisation is managing through a programme of leadership development
and service redesign.
5.6 Leadership within the organisation is effective with good communication between elected members and senior
management through Leaders’ meetings, Convenors meetings, specific interest working groups and all-member
briefings, where appropriate.  There are also regular meetings with conveners and pre-agenda discussions in respect
of each scheduled Council and Committee meeting.
5.7 Our Local Outcome Improvement Plan and Corporate Plan set out our vision and purpose and have been subject to
consultation and approval.  The Financial Strategy and approved Medium Term Financial Plan and Revenue and
Capital budgets prioritise how our financial resources are to be deployed.  The Transformation and Change Strategy
highlights our ambition to better support the delivery of services to the people of Perth and Kinross, particularly those in
the greatest need.  Key strategic documents such as the Capital Investment Blueprint and Corporate Asset
Management Strategy, Housing Investment Programme, Anti-Poverty Strategy, Economic Wellbeing Plan, Climate
Change Strategy and Sustainable Procurement Strategy provide the necessary direction to the organisation to enable
it to deliver on its vision and priorities and to achieve its purpose.  
5.8 We recognise the importance of good stakeholder engagement and will continue to engage and work in partnership
with our communities, partners, and other stakeholders to ensure that we design and deliver the public services that
our communities need and value.  Our approach to consultations is based on the National Standards for Community
Engagement, and we have established a wide range of consultation processes and procedures.  The Community
Empowerment (Scotland) Act 2015 provides a framework for improving the quality of engagement and participation
which is reflected in the Local Outcome Improvement Plan and our own Corporate Plan. 
5.9 We are operating in an increasingly complex and financially challenging public sector landscape and must be able to
adapt and evolve our services and workforce to continue delivering cost-efficient, high-quality services.  Our people
remain our most valuable assets and as an organisation we will secure the best outcomes for our communities by
23 | Perth and Kinross Annual Accounts 2025/26 Page 42 of 314

Page 43

24 | Perth and Kinross Council Annual Accounts 2025/26 
investing in the development of our workforce and of our leaders to ensure that they have the right skills and have
sufficient capacity to deliver.  Our approach is outlined in our Corporate Workforce Plan – Resourcing PKC Everyone
Has Something To Offer.  This approach was reviewed in 2023/24 and a new refreshed People and Culture Strategy
was approved in June 2024. 
5.10  The Council’s Scheme of Administration sets out the Council’s decision-making structure in terms of roles, remits and
responsibilities to ensure transparency and accountability.  This reflects the priorities and objectives of the Council and
the senior officer leadership structure.
5.11 We have a robust suite of policies, procedures and management processes to ensure that there are appropriate
internal controls in place in respect of: -
• Workforce Planning and Management  
• Financial Planning and Management 
• Risk and Performance Management 
• Transformation and Change Management
• Procurement and Commissioning 
• Major Investment Project Management
• Health and Safety 
• Information Management and Security
• Civil Contingencies and Business Continuity  
• Anti- Fraud and Corruption  
• Conflicts of Interests 
• Gifts and Hospitality 
• Whistleblowing and Reporting Concerns 
• Complaints Handling 
• Officer and Elected Member Conduct 
5.12 As a public body we must be open, transparent and accountable for our decisions, actions, and performance.  Our
management and democratic structures and processes are designed to facilitate effective decision making and the
proper scrutiny of those decisions and their impact in terms of performance and the achievement of our intended
outcomes.
5.13 The Council set a final revenue budget for the year 2026/27 in March 2026, along with provisional budgets for 2027/28
and 2028/29.  These revenue budgets demonstrate clear linkages with the Transformation and Change strategy.  Each
budget is allocated to a named budget holder.  Budgets are monitored regularly by Service Management Teams and
overall financial performance is monitored regularly by the Executive Leadership Team.  Council, through the Finance
and Resources Committee, receives regular financial monitoring information as part of the budgetary control framework
and provides the required political scrutiny of our financial management and performance.
5.14 A capital budget for 2026/27 to 2031/32 was approved in March 2026.  Capital spend is monitored by Service
Management Teams and the Executive Leadership Team and reported regularly to the Finance and Resources
Committee as part of the budgetary control framework.  
5.15 The Council publishes an Annual Performance Report on its performance against the objectives set out within the
Corporate Plan and Local Outcome Improvement Plan.  In order to improve transparency and clarity of these links, a
Corporate Delivery and Improvement Plan has been developed. 
5.16 The Corporate Delivery and Improvement Plan, which was approved by Council in May 2024, strengthens the
alignment between the Corporate Plan priorities, improvement activity and budget and resource allocations, was
developed and subject to consultation in year.  It sets out detailed actions and outcomes for each priority and includes
appropriate performance indicators.  Performance is reported to the Executive Leadership Team and publicly through
the Council’s Scrutiny and Performance Committee and relevant themed committees.  Financial performance is
publicly reported through the Finance and Resources Committee and relevant service committees. 
5.17 The Council has a published process for dealing with the following and annually reports on performance in this respect
of these areas: - 
• Complaints from members of the public
• Requests for accessing information under the Freedom of Information legislation
• Accessing information under the Data Protection legislation
6 Governance Assurance Process
6.1 The Council utilises a robust process of gathering assurance information from the Strategic Leadership Team, which
concludes with Certificates of Assurance being signed.
6.2 Corporate assurance has also been provided as regards the adequacy of the internal controls from the following
Officers:
• Chief Finance Officer (S 95 Officer)
• Strategic Lead for Legal and Governance Services /Monitoring Officer
24 | Perth and Kinross Annual Accounts 2025/26 Page 43 of 314

Page 44

25 | Perth and Kinross Council Annual Accounts 2025/26 
• Chief Internal Auditor
• Data Protection Officer
• Records and Information Security Manager
• Corporate Procurement 
• Corporate HR Manager
6.3 For Arm’s Length External Organisations, reliance has been placed upon:
• Unaudited financial statements of the companies (audited accounts will be scrutinised when available)
• Assurance self-assessment evaluations
• Terms and conditions of Service Level Agreements 
• Contract monitoring meetings with Services
• Performance information and financial monitoring reports to Services 
• Presentations and reports to the Scrutiny and Performance Committee 
6.4  For Tayside Contracts Joint Committee, Tayside Valuation Joint Board and Perth and Kinross Integration Joint Board,
reliance is placed upon each organisation’s own Annual Governance Statement.
6.5 The draft Annual Governance Statement is considered by the Strategic Leadership Team and the Council’s Scrutiny
and Performance Committee prior to inclusion within the final unaudited 2025/26 Annual Accounts.
6.6 The Annual Governance Statement is considered by the Audit and Risk Committee as part of the unaudited 2025/26
Annual Accounts.
7 Effectiveness of Governance Arrangements for 2025/26
7.1 Based on the assurance process outlined above, in terms of effectiveness, the Council’s governance arrangements
continue to be regarded as fit for purpose in accordance with the governance framework, subject to the areas identified
for review or improvement set out in section 8 below. 
7.2 Our financial management arrangements conform with the governance requirements of the CIPFA Statement on the
Role of the Chief Financial Officer in Local Government (2015). 
7.3 Our assurance arrangements conform with the governance requirements of the CIPFA Statement on the Role of the
Head of Internal Audit (2010) and the External Quality Assessment of the Internal Audit function has been assessed as
fully conforming with the Public Sector Internal Audit Standards in year March 2025, with the Global Internal Audit
Standards in the UK Public Sector adopted in year, in line with professional requirements.
7.4 The Council has designated the Strategic Lead for Legal and Governance as the Senior Information Risk Owner, with
the Strategic Lead for Customer and Digital Services as Depute.  Our information security measures have been
reviewed in 2025/26 to ensure continuing compliance with the Public Service Network (PSN) and other cyber security
requirements. 
7.5 The Scottish Information Commissioner issued a Practice Recommendation in respect of record-keeping on a specific
matter.  The Council has acknowledged that recommendation and is progressing relevant actions.  This matter should
be viewed however in the context of the Council’s wider records management framework, which was independently
assessed by the Keeper of the Records of Scotland in April 2026 as setting out proper arrangements for the
management of public records and as capable of ensuring compliance with the Public Records (Scotland) Act 2011. 
This distinction is important: the intervention related to a particular issue, whereas the Council’s wider records
management framework has been subject to separate external assessment and assurance and deemed compliant. 
Through the Council’s Records Management Plan there are clear accountability, authority and oversight arrangements
in place through the Senior Information Risk Owner and reporting to the Chief Executive and Executive Leadership
Team.  The Council continues to work constructively with the Keeper’s team to implement agreed improvement actions
where required and, taken together, these arrangements provide assurance that the Council’s overall governance and
records management framework remains sound and subject to active oversight and continuous improvement
7.6 Our counter-fraud and anti-corruption arrangements conform with CIPFA’s Code of Practice on Managing the Risks of
Fraud and Corruption.
7.7 The Chief Internal Auditor is the Council’s nominated Money Laundering Reporting Officer.  There has been no relevant
activity in respect of Council and its group during the year.
7.8 The Council’s Audit and Risk Committee operates in line with CIPFA’s Audit Committees: Practical Guidance for Local
Authorities.
7.9 We have structures in place which support constructive challenge and effective scrutiny to our system of internal
control and our broader governance arrangements.  In particular: - 
• Audit and Risk Committee
• Scrutiny and Performance Committee
• Finance and Resources Committee
• Themed Committees
• Executive Leadership Team / Strategic Leadership Team
25 | Perth and Kinross Annual Accounts 2025/26 Page 44 of 314

Page 45

26 | Perth and Kinross Council Annual Accounts 2025/26 
• Policy and Governance Group
• Transformation Board
• Internal Audit
• External Audit (currently Audit Scotland) 
8  Opinion of the Chief Internal Auditor
8.1 Audit activity and performance is detailed in the Annual Report by the Chief Internal Auditor for the year 2025/26, which
will be presented to the Council’s Audit and Risk Committee in June 2026.  This report takes into consideration the
requirements of the Global Internal Audit Standards in the UK Public Sector, which came into effect for the financial
year 2025/26.  The report contains the Chief Internal Auditor’s opinion in respect of the effectiveness of the governance
arrangements in place, as follows: -
“The Chief Internal Auditor concludes that reasonable reliance can be placed on the Council’s risk management and
governance arrangements, and systems of internal control for 2025/26, subject to management implementation of the
agreed actions detailed in Internal Audit reports.”
9  Areas for Review/Continued Improvement Action
9.1 We rely heavily on technology, and the way in which technology can shape and influence how we deliver services and
work as an organisation in the future.  We continue to review our cyber resilience and information governance
arrangements to ensure that they are fit for purpose, robust, and continue to support new and innovative ways of
working, such as the ethical and responsible use of Artificial Intelligence (AI).  The AI Governance Group has been
established to provide the necessary oversight and will continue to develop its role in governing the use of emergent
technologies. 
9.2 The Council’s financial management, governance and reporting arrangements have been assessed against the
financial management standards set out within the CIPFA Financial Management Code (2019).  The Code is based
upon the standards set out elsewhere within the Annual Governance Statement and the Council is considered to be
compliant with the Code.  Improvement actions arising from the review include consideration of how the Council can
build upon existing practice in its budget consultation with stakeholders and strengthening existing reporting
arrangements. 
9.3 In addition to these areas, there are some specific areas which will be held under review pending the outcome of
current transformation and change activity or implemented through operational service redesign and business
improvement activity:
• Leadership culture and capacity
• Capacity and resources to lead, develop and deliver ongoing and future programme of transformation and
change 
• Ownership of and management of information assets
• Strategic procurement and commissioning
• Workforce planning and organisational development
• Use of the Financial Strategy to address financial pressures
• Our approach to community engagement and empowerment
• Review of the delivery of services through Arms-Length External organisations through the Strategic Alliance 
26 | Perth and Kinross Annual Accounts 2025/26 Page 45 of 314

Page 46

27 | Perth and Kinross Council Annual Accounts 2025/26 
Conclusion and Opinion
The Council is legally required to review the effectiveness of its governance arrangements and to publish an Annual
Governance Statement, with its Annual Accounts.  The governance framework and, in particular, the system of internal control,
has been assessed in accordance with guidance from the Chartered Institute of Public Finance and Accountancy (CIPFA) and
has been considered in light of the addendum published for 2025/26.
The review of the effectiveness of the Council’s system of internal control and overall governance framework has been informed
by different sources assessing risk and providing assurance: -
• Executive Leadership Team/ Strategic Leadership Team
• Chief Finance Officer
• Strategic Lead for Legal and Governance Services /Monitoring Officer
• Chief Internal Auditor/ Internal Audit
• Data Protection Officer
• Policy and Governance Group
• External Audit 
• External agencies and inspectorates. 
The Council’s Governance Framework is considered robust and effective.
Certificates of assurance have been received from Strategic Leads, each of whom is accountable for maintaining the system of
internal control within their respective service area.  Through this process, Strategic Leads have reviewed the governance
arrangements and key internal controls operating within their services and have confirmed that these remain effective.
The Chief Finance Officer has provided assurance that the financial arrangements in place conform to the relevant CIPFA
requirements and that our expenditure is lawful.  Similarly, the Monitoring Officer has provided assurance that our governance
arrangements ensure compliance with relevant laws, regulations, internal policies, and procedures.
The Chief Internal Auditor has provided assurance for the year 2025/26 and an Internal Audit plan will be developed for 2026/27
that will focus on areas which have been identified as corporate or service specific risks in relation to core business and the
delivery of the Council’s agreed strategic priorities, in line with the requirements of the Global Internal Audit Standards in the UK
Public Sector. 
We are satisfied that our governance arrangements and, in particular, our system of internal control, continue to be regarded as
fit for purpose.  Any identified improvement actions will continue to be delivered and monitored through service improvement
plans, audit plans and change programmes to avoid duplication of effort. 
Our governance framework will continue to be reviewed and adapted where necessary to ensure that it remains robust and
effective. 
Signed:     Signed: 
Thomas Glen  Councillor Eric Drysdale
Chief Executive  Leader of the Council
Date  Date
27 | Perth and Kinross Annual Accounts 2025/26 Page 46 of 314

Page 47

28 | Perth and Kinross Council Annual Accounts 2025/26 
Independent auditor’s report to the members of Perth and Kinross Council and the Accounts
Commission (to follow) 
28 | Perth and Kinross Annual Accounts 2025/26 Page 47 of 314

Page 48

29 | Perth and Kinross Council Annual Accounts 2025/26 
Independent auditor’s report to the members of Perth and Kinross Council and the Accounts
Commission (to follow) 
29 | Perth and Kinross Annual Accounts 2025/26 Page 48 of 314

Page 49

30 | Perth and Kinross Council Annual Accounts 2025/26 
Independent auditor’s report to the members of Perth and Kinross Council and the Accounts
Commission (to follow) 
30 | Perth and Kinross Annual Accounts 2025/26 Page 49 of 314

Page 50

General Housing Capital Insurance Capital Capital Total Unusable Total
Fund Revenue Fund Fund Receipts Grants Usable Reserves Authority
Balance Account Reserve Unapplied Reserves (Note 32) Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 1 April 2024 (83,794) (2,260) (31,026) (1,709) (2,102) (87) (120,978) (718,738) (839,716)
Movement in reserves during
2024/25
Total Comprehensive Income
and Expenditure 28,909 (2,749) 0 0 0 0 26,160 83,859 110,019
Adjustments to Usable
Reserves permitted by
accounting standards (6,187) 776 0 0 0 0 (5,411) 5,411 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis (Note 5) (9,178) 1,975 0 0 770 (1,060) (7,493) 7,493 0
Adjustment to the statutory
repayment of debt for service
concession arrangements -
permitted flexibility (2,914) 0 0 0 0 0 (2,914) 2,914 0
Decrease or (Increase) in
2024/25 10,630 2 0 0 770 (1,060) 10,342 99,677 110,019
Transfers to/(from) Other
Statutory Reserves 4,880 0 (5,966) 1,086 0 0 0 0 0
Balance at 31 March 2025
carried forward (68,284) (2,258) (36,992) (623) (1,332) (1,147) (110,636) (619,061) (729,697)
Movement in reserves during
2025/26
Total Comprehensive Income
and Expenditure 41,231 1,341 0 0 0 0 42,572 (43,046) (474)
Adjustments to Usable
Reserves permitted by
accounting standards (6,697) 2,312 0 0 0 0 (4,385) 4,385 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis (Note 5) (28,802) (4,148) 0 0 (174) (215) (33,339) 33,339 0
Adjustment to the statutory
repayment of debt for service
concession arrangements -
permitted flexibility (2,746) 0 0 0 0 (2,746) 2,746 0
(Increase) or Decrease in
2025/26 2,986 (495) 0 0 (174) (215) 2,102 (2,576) (474)
Transfers to/(from) Other
Statutory Reserves 4,365 (2,477) (1,888) 0 0 0 0
Balance at 31 March 2026
carried forward (60,933) (2,753) (39,469) (2,511) (1,506) (1,362) (108,534) (621,637) (730,171)
MOVEMENT IN RESERVES STATEMENT
31 | Perth and Kinross Annual Accounts 2025/26 Page 50 of 314

Page 51

PKC - GENERAL#
2024/25
Gross Income Net Notes Gross Income Net
Expenditure Expenditure Expenditure Expenditure
£'000 £'000 £'000 £'000 £'000 £'000
COUNCIL SERVICES
173,520 (5,546) 167,974 Education and Learning 183,268 (5,914) 177,354
218,171 (120,943) 97,228 Health and Social Care 245,219 (134,949) 110,270
29,903 (5,896) 24,007 Children, Families and Justice 30,612 (5,946) 24,666
37,967 (11,270) 26,697 Economy, Development and Planning 34,543 (12,062) 22,481
55,798 (5,924) 49,874 Environment and Infrastructure 59,643 (12,429) 47,214
31,299 (12,273) 19,026 Housing and Communities 32,571 (13,884) 18,687
85,064 (6,098) 78,966 Property Services 95,206 (9,374) 85,832
5,637 (1,078) 4,559 Legal and Governance 5,335 (1,330) 4,005
36,545 (19,359) 17,186 Customer and Digital Services 32,959 (15,397) 17,562
6,304 (799) 5,505 Strategic Planning, People and Performance 5,524 (303) 5,221
283 0 283 Projects and Programmes 325 0 325
10,980 (2,691) 8,289 Finance and Business Support 11,189 (2,656) 8,533
1,327 0 1,327 Directorate Core Costs 578 (2) 576
38,239 (35,437) 2,802 Housing Revenue Account 42,747 (38,522) 4,225
1,434 0 1,434 Valuation Joint Board 1,393 0 1,393
732,471 (227,314) 505,157 COST OF SERVICES 781,112 (252,768) 528,344
138 (244) (106) Other Operating Income and Expenditure 8 1,728 (769) 959
25,079 (5,649) 19,430
Financing and Investment Income and
Expenditure 9 28,506 (4,465) 24,041
0 (498,321) (498,321) Taxation and Non-Specific Grant Income 10 0 (510,772) (510,772)
757,688 (731,528) 26,160 Deficit on Provision of Services 811,346 (768,774) 42,572
83,518
(Surplus)/Deficit on revaluation of non
current assets (46,752)
341
Remeasurement of the net defined benefit
liability 3,706
83,859
Other Comprehensive Income and
Expenditure (43,046)
110,019 Total Comprehensive Income and
Expenditure (474)
2025/26
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT
32 | Perth and Kinross Annual Accounts 2025/26 Page 51 of 314

Page 52

PKC - GENERAL#
Notes
£'000 £'000
1,580,002 Property, Plant and Equipment 21 1,681,371
52,099 Heritage Assets 22 52,099
16,184 Investment Property 23 17,029
2,189 Intangible Assets 24 1,216
530 Long Term Debtors 26 357
1,651,004 Long Term Assets 1,752,072
0 Short Term Investments 39 5,014
875 Assets Held for Sale 25 565
620 Inventories 27 593
50,007 Short Term Debtors 28 47,971
24,645 Cash and Cash Equivalents 44 17,559
76,147 Current Assets 71,702
(40,581) Short Term Borrowing 39 (133,925)
(95,500) Short Term Creditors 29 (84,063)
(2,814) Provisions 30 (1,391)
(138,895) Current Liabilities (219,379)
(1,951) Provisions 30 (3,664)
(683,808) Long Term Borrowing 39 (699,871)
(172,800) Other Long Term Liabilities 18, 20 and 36 (170,689)
(858,559) Long Term Liabilities (874,224)
729,697 NET ASSETS 730,171
110,636 Usable Reserves 108,534
619,061 Unusable Reserves 32 621,637
729,697 TOTAL RESERVES 730,171
The Unaudited Annual Accounts were issued on 29 June 2026.
The accompanying notes form an integral part of these financial statements.
Scott Walker CPFA
Chief Finance Officer
Date: 
31 March 202631 March 2025
BALANCE SHEET
33 | Perth and Kinross Annual Accounts 2025/26 Page 52 of 314

Page 53

PKC - GENERAL#
2024/25 Notes 2025/26
£'000 £'000
(26,160) Deficit on the provision of services (42,572)
73,936 Adjustments to net deficit on the provision of services for non cash movements 80,758
(43,242)
Adjustments for items included in the net deficit on the provision of services that
are investing and financing activities (24,813)
4,534 Net cash flows from Operating Activities 13,373
(91,070) Investing Activities 42 (121,928)
79,998 Financing Activities 43 101,469
(6,538) Net decrease in cash and cash equivalents (7,086)
31,183 Cash and cash equivalents at the beginning of the reporting period 24,645
24,645 Cash and cash equivalents at the end of the reporting period 44 17,559
CASH FLOW STATEMENT
34 | Perth and Kinross Annual Accounts 2025/26 Page 53 of 314

Page 54

35 | Perth and Kinross Council Annual Accounts 2025/26 
Statement of Responsibilities for the Annual Accounts
The Council’s Responsibilities
The Council is required:
- to make arrangements for the proper administration of its financial affairs and to ensure that one of its officers has the
responsibility for those affairs under Section 95 of the Local Government (Scotland) Act 1973.  In this Council that
officer is the Chief Finance Officer. 
- to manage its affairs to secure economic, efficient and effective use of resources and safeguard its assets.
- ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority Accounts (Scotland)
Regulations 2014), and so far as is compatible with that legislation, in accordance with proper accounting practices
(section 12 of the Local Government in Scotland Act 2003).
- approve the Annual Accounts for signature.
I confirm that these Annual Accounts were approved for signature by the Audit and Risk Committee at its meeting in November
2026.
Signed on behalf of Perth and Kinross Council 
Councillor Eric Drysdale
Leader of the Council 
Date: 
The Responsibilities of the Chief Finance Officer
The Chief Finance Officer is responsible for the preparation of the Council’s Annual Accounts in accordance with proper
practices as required by legislation and as set out in the CIPFA/LASAAC Code of Practice on Local Authority Accounting in the
United Kingdom (the Accounting Code).  
In preparing these Annual Accounts, the Chief Finance Officer has:
• selected suitable accounting policies and applied them consistently;
• made judgements and estimates that were reasonable and prudent;
• complied with legislation; and
• complied with the Local Authority Accounting Code (in so far as it is compatible with legislation).
The Chief Finance Officer has also:
- kept proper accounting records which were up to date;
- taken reasonable steps for the prevention and detection of fraud and other irregularities;
- used the going concern basis of accounting on the assumption that the Council will continue in operational existence
for the twelve months following the approval of the Annual Accounts.
I certify that the Annual Accounts give a true and fair view of the financial position of the Council and its group at the reporting
date and the transactions of the Council and its Group for the year ended 31 March 2026. 
Scott Walker CPFA
Chief Finance Officer
Date: 
35 | Perth and Kinross Annual Accounts 2025/26 Page 54 of 314

Page 55

36 | Perth and Kinross Council Annual Accounts 2025/26 
Notes to the Financial Statements
1. Accounting Policies
General
The Annual Accounts have been prepared in accordance with International Financial Reporting Standards (IFRS) and
adapted to the Code of Practice as required by the Local Authority Accounts (Scotland) Regulations 2014 and section 12
of the Local Government in Scotland Act 2003.  These practices primarily comprise the Code of Practice on Local
Authority Accounting in the United Kingdom 2025/26 and supported by International Financial Reporting Standards.  The
Annual Accounts are intended to present a true and fair view of the financial position and transactions of the authority
and have been prepared in accordance with the fundamental accounting principles of relevance, reliability, comparability,
understandability and materiality.  
The accounting convention adopted in the Annual Accounts is principally historical cost, modified by the revaluation of
certain categories of non-current assets and financial instruments.
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, or when the Council is entitled to the income, not simply when
cash payments are made or received.  
In particular:
• Revenue from contracts with service recipients, whether for services or the provision of goods, is recognised
when (or as) the goods and services are transferred to the service recipient in accordance with the performance
obligations in the contract.
• Supplies are recorded as expenditure when they are consumed – where there is a gap between the date supplies
are received and their consumption, they are carried as inventories on the Balance Sheet.
• Expenses in relation to services received (including those rendered by the Council’s officers) are recorded as
expenditure when the services are received, rather than when payments are made.
• Interest payable on borrowings and receivable on investments is accounted for on the basis of the effective
interest rate for the relevant financial instrument rather than the cash flows fixed or determined by the contract.
• Where revenue and expenditure have been recognised but cash has not been received or paid, a debtor or
creditor for the relevant amount is recorded in the Balance Sheet.  Where there is evidence that debts are unlikely
to be settled, the balance of debtors is written down and a charge made to revenue for the income that might not
be collected.
• Where the Council is acting as an agent for another party (e.g. in the collection of Non-Domestic Rates and Water
and Wastewater), income and expenditure are recognised only to the extent that commission is receivable by the
Council for the agency services rendered or the Council incurs expenses directly on its own behalf in rendering
the services.
Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on notice of not
more than 24 hours.  Cash equivalents are highly liquid investments that mature in three months or less from the date of
acquisition and that are readily convertible to known amounts of cash with insignificant risk of change in value.  In the
Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts that are repayable on demand and
form an integral part of the Council’s cash management.
Changes in Accounting Policies and Estimates and Errors
Changes in accounting policies are only made when required by proper accounting practices or the change provides
more reliable or relevant information about the effect of transactions, other events or conditions on the Council’s financial
position or financial performance.  Where a change is made, it is applied retrospectively by adjusting opening balances
and comparative amounts for the prior period as if the new policy had always been applied.  
Changes in accounting estimates are accounted for prospectively, i.e., in the current and future years affected by the
change.  Material errors discovered in prior period figures are corrected retrospectively by amending opening balances
and comparative amounts for the prior period.  
36 | Perth and Kinross Annual Accounts 2025/26 Page 55 of 314

Page 56

37 | Perth and Kinross Council Annual Accounts 2025/26 
Charges to Revenue for Non-Current Assets
Services, support services and trading accounts are debited with the following amounts to record the cost of holding fixed
assets during the year:
• depreciation attributable to the assets used by the relevant service;
• revaluation and impairment losses on assets used by the service where there are no accumulated gains in the
Revaluation Reserve against which the losses can be written off;
• amortisation of intangible fixed assets attributable to the service.
The Council is not required to raise council tax to cover depreciation, revaluation and impairment losses or amortisations. 
However, it is required to make an annual provision from revenue to contribute towards the reduction in its overall
borrowing requirement equal to an amount calculated on a prudent basis determined by the Council in accordance with
the Statutory Repayment of Loans Fund Advances, depreciation, revaluation and impairment losses and amortisations
are therefore replaced by revenue provision in the General Fund Balance, by way of an adjusting transaction with the
Capital Adjustment Account (CAA) in the Movement in Reserves Statement (MiRS) for the difference between the two.
Contingent Assets and Liabilities
A contingent asset arises where an event has taken place that gives the Council a possible asset whose existence will
only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the control of the Council. 
A contingent liability arises where an event has taken place that gives the Council a possible obligation whose existence
will only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the control of the
Council.  Contingent liabilities also arise in circumstances where a provision would otherwise be made but either it is not
probable that an outflow of resources will be required, or the amount of the obligation cannot be measured reliably.
Contingent Assets and Liabilities are not recognised in the Balance Sheet but disclosed in a note to the accounts.
Employee Benefits
Benefits Payable During Employment
Short-term employee benefits (those that fall due wholly within 12 months of the year-end), such as wages and salaries,
paid annual leave and paid sick leave, bonuses and non-monetary benefits (e.g. cars) for current employees, are
recognised as an expense in the year in which employees render service to the Council.  An accrual is made against
services in the Surplus or Deficit on the Provision of Services for the cost of holiday entitlements and other forms of leave
earned by employees but not taken before the year-end and which employees can carry forward into the next financial
year.  Any accrual made is required under statute to be reversed out of the General Fund Balance by a credit to the
Employee Statutory Adjustment Account in the MiRS.
Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to terminate an officer’s employment
before the normal retirement date, or an officer’s decision to accept voluntary redundancy, and are charged in the
Comprehensive Income and Expenditure Statement (CIES) when the Council is demonstrably committed to terminate
the employment of an officer.
Where termination benefits involve the enhancement of pensions, statutory provisions require the General Fund Balance
to be charged with the amount payable by the Council to the pension fund or pensioner in the year, not the amount
calculated according to the relevant accounting standards.  In the MiRS, appropriations are required to and from the
Pensions Reserve to remove the notional debits and credits for termination benefits related to pensions enhancements
and replace them with debits for the cash paid to the pension fund and pensioners and any such amounts payable but
unpaid at the year-end.
Post-Employment Benefits
Employees of the Council are members of two separate pension schemes: The Scottish Teachers’ Superannuation
Scheme and the Local Government Pension Scheme.  
The Scottish Teachers’ Superannuation Scheme is a statutory unfunded defined final benefit salary scheme administered
nationally by the Scottish Public Pensions Agency on behalf of the Scottish Government.  There are no investment
assets built up under the scheme to meet pension liabilities.  The contributions paid into the scheme by the Council and
teaching employees are determined nationally and member’s pension benefits are prescribed under the Teachers’
Superannuation (Scotland) Regulations 2005 with the Scottish Government being responsible for meeting the scheme’s
liabilities.  
Other employees, subject to certain qualifying criteria, are eligible to join the Local Government Pension Scheme
(LGPS).  The LGPS is a statutory funded defined final benefit salary scheme operated through local pension funds. 
Perth and Kinross Council and its employees pay contributions into the Tayside Pension Fund administered by Dundee
City Council calculated at a level to balance the pension liabilities with investment assets.  The contributions paid into the
scheme by employees and member pension benefits are prescribed, for the period to which the accounts relate, by the
Local Government Pensions Scheme (Scotland) Regulations 1998 as amended.  Perth and Kinross Council’s
contributions, as employer, into the Tayside Pension Fund are subject to the advice of the Fund actuary.  
37 | Perth and Kinross Annual Accounts 2025/26 Page 56 of 314

Page 57

38 | Perth and Kinross Council Annual Accounts 2025/26 
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned as employees worked
for the Council.  However, the arrangements for the teachers’ scheme mean that liabilities for these benefits cannot be
attributed specifically to the Council.  The scheme is therefore accounted for as if it were a defined contributions scheme
– no liability for future payments of benefits is recognised in the Balance Sheet and the Education Service line in the
CIES is charged with the employer’s contributions payable to Teachers’ Pensions in the year.
The Local Government Scheme is accounted for as a defined benefits scheme.  The liabilities of the Tayside Pension
Fund attributable to the Council are included in the Balance Sheet on an actuarial basis using the projected unit method
– i.e. an assessment of the future payments that will be made in relation to retirement benefits earned to date by
employees, based on assumptions about mortality rates, employee turnover rates, etc., and projected earnings for
current employees.  Liabilities are discounted to their value at current prices, using a discount rate which is based on the
indicative rate of return on the high quality corporate bond index (i Boxx AA).
The assets of the Tayside Pension Fund attributable to the Council are included in the Balance Sheet at their fair value:
• quoted securities – current bid price;
• unquoted securities – professional estimate;
• unitised securities – current bid price;
• property – market value.
The change in the net pension’s asset / liability is analysed into the following components:
• Service cost comprising:
o Current service cost – the increase in liabilities as result of years of service earned this year – allocated in
the CIES to the services for which the employees worked;
o past service cost – the increase in liabilities as a result of a scheme amendment or curtailment whose
effect relates to years of service earned in earlier years – debited to the Surplus/Deficit on the Provision of
Services in the CIES as part of Non Distributed Costs;
o net interest on the net defined liability / (asset), i.e. net interest expense for the authority – the change
during the period in the net defined benefit liability / (asset) that arises from the passage of time charged to
the Financing and Investment Income and Expenditure line of the CIES – this is calculated by applying the
discount rate used to measure the defined benefit obligation at the beginning of the period to the net
defined benefit liability / (asset) at the end of the period – taking into account any changes in the net
defined benefit liability / (asset) during the period as a result of contribution and benefit payments.
• Remeasurements comprising:
o the return on plan assets - excluding amounts included in net interest on the net defined benefit liability / 
(asset) – charged to the Pensions Reserve as Other Comprehensive Income and Expenditure;
o actuarial gains and losses – changes in the net pensions liability that arise because events have not
coincided with assumptions made at the last actuarial valuation or because the actuaries have updated
their assumptions – charged to the Pensions Reserve as Other Comprehensive Income and Expenditure.
• Contributions paid to the Tayside Pension Fund – cash paid as employer’s contributions to the pension fund in
settlement of liabilities; not accounted for as an expense. 
In relation to retirement benefits, statutory provisions require the General Fund Balance to be charged with the amount
payable by the Council to the pension fund or directly to pensioners in the year, not the amount calculated according to
the relevant accounting standards.  In the MiRS, this means that there are appropriations to and from the Pensions
Reserve to remove the notional debits and credits for retirement benefits and replace them with debits for the cash paid
to the pension fund and pensioners and any such amounts payable but unpaid at the year-end.  The negative balance
that arises on the Pensions Reserve thereby measures the beneficial impact on the General Fund of being required to
account for retirement benefits on the basis of cash flows rather than as benefits are earned by employees.
Discretionary Benefits
The Council also has restricted powers to make discretionary awards of retirement benefits in the event of early
retirements.  Any liabilities estimated to arise as a result of an award to any member of staff (including teachers) are
accrued in the year of the decision to make the award and accounted for using the same policies as are applied to the
LGPS.  
38 | Perth and Kinross Annual Accounts 2025/26 Page 57 of 314

Page 58

39 | Perth and Kinross Council Annual Accounts 2025/26 
Events after the Reporting Period
Events after the reporting period are those events, both favourable and unfavourable, that occur between the end of the
reporting period and the date when the Annual Accounts are authorised for issue.  Two types of events can be identified:
• those that provide evidence of conditions that existed at the end of the reporting period – the Annual Accounts are
adjusted to reflect such events;
• those that are indicative of conditions that arose after the reporting period – the Annual Accounts are not adjusted
to reflect such events, but where a category of events would have a material effect, disclosure is made in the
notes of the nature of the events and their estimated financial effect.
Events taking place after the date of authorisation for issue are not reflected in the Annual Accounts.
Fair Value Measurement
The Council measures some of its non-financial assets such as surplus assets and investment properties at fair value at
each reporting date.  Fair value is the price that would be received to sell an asset or paid to transfer a liability in an
orderly transaction between market participants at the measurement date.  The fair value measurement assumes that
the transaction to sell the asset or transfer the liability takes place either:
a) in the principal market for the asset or liability, or
b) in the absence of a principal market, in the most advantageous market for the asset or liability.
The Council measures the fair value of an asset or liability using the assumptions that market participants would use
when pricing the asset or liability, assuming that market participants act in their economic best interest.
When measuring the fair value of a non-financial asset, the Council takes into account a market participant’s ability to
generate economic benefits by using the asset in its highest and best use or by selling it to another market participant
that would use the asset in its highest and best use.
The Council uses valuation techniques that are appropriate in the circumstances and for which sufficient data is
available, maximising the use of relevant observable inputs and minimising the use of unobservable inputs.
Inputs to the valuation techniques in respect of assets and liabilities for which fair value is measured or disclosed in the
Council’s financial statements are categorised within the fair value hierarchy, as follows:
Level 1: quoted prices (unadjusted) in active markets for identical assets or liabilities that the authority can access at
the measurement date 
Level 2: inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either
directly or indirectly 
Level 3: unobservable inputs for the asset or liability.
Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when the Council becomes a party to the contractual provisions
of a financial instrument and are initially measured at fair value and carried at their amortised cost.  Annual charges to
the Financing and Investment Income and Expenditure line in the CIES for interest payable are based on the carrying
amount of the liability, multiplied by the effective rate of interest for the instrument.  The effective interest rate is the rate
that exactly discounts estimated future cash payments over the life of the instrument to the amount at which it was
originally recognised.
For most of the borrowings that the Council has, this means that the amount presented in the Balance Sheet is the
outstanding principal repayable (plus accrued interest) and interest charged to the CIES is the amount payable for the
year according to the loan agreement.  
Gains and losses on the repurchase or early settlement of borrowing are credited or debited to the Financing and
Investment Income and Expenditure line in the CIES in the year of repurchase/settlement.  However, where repurchase
has taken place as part of a restructuring of the loan portfolio that involves the modification or exchange of existing
instruments, the premium or discount respectively is deducted from or added to the amortised cost of the new or
modified loan and the write-down to the CIES is spread over the life of the loan by an adjustment to the effective interest
rate.
Where premiums and discounts have been charged to the CIES, regulations allow the impact on the General Fund
Balance to be spread over future years.  The Council has a policy of spreading the gain/loss over the term of the
replacement loan.  The reconciliation of amounts charged to the CIES to the net charge required against the General
Fund Balance is managed by a transfer to or from the Financial Instruments Adjustment Account in the MiRS.  
39 | Perth and Kinross Annual Accounts 2025/26 Page 58 of 314

Page 59

40 | Perth and Kinross Council Annual Accounts 2025/26 
Financial Assets
Financial assets are classified based upon a classification and measurement approach that reflects the business model
for holding the financial assets and their cashflow characteristics.  There are three main classes of financial assets
measured at:-
• amortised cost
• fair value through profit or loss (FVPL), and
• fair value through other comprehensive income (FVOCI)
The Council’s business model is to hold investments to collect contractual cash flows.  Financial assets are therefore
classified as amortised cost, except for those whose contractual payments are not solely payment of principal and
interest (i.e. where cash flows do not take the form of a basic debt instrument).
Loans and receivables are recognised on the Balance Sheet when the Council becomes a party to the contractual
provisions of a financial instrument and are initially measured at fair value.  They are subsequently measured at their
amortised cost.  Annual credits to the Financing and Investment Income and Expenditure line in the CIES for interest
receivable are based on the carrying amount of the asset multiplied by the effective rate of interest for the instrument. 
For deposits that the Council has made, this means that the amount presented in the Balance Sheet is the outstanding
principal receivable (plus accrued interest) and interest credited to the CIES is the amount receivable for the year in the
agreement.
However, the Council has made loans to various organisations at less than market rates (soft loans).  When a soft loan is
made, a loss is recorded in the CIES (debited to the appropriate service) for the present value of the interest that will be
foregone over the life of the instrument, resulting in a lower amortised cost than the outstanding principal.  In subsequent
years interest is credited to the Financing and Investment Income and Expenditure line in the CIES at a higher effective
rate of interest than the rate receivable from the voluntary organisations, with the difference serving to increase the
amortised cost of the loan in the Balance Sheet. 
Where assets are identified as impaired because of a likelihood arising from a past event that payments due under the
contract will not be made, the asset is written down and a charge made to the Financing and Investment Income and
Expenditure line in the CIES.  The impairment loss is measured as the difference between the carrying amount and the
present value of the revised future cash flows discounted at the asset’s original effective interest rate.
Any gains and losses that arise on the de-recognition of an asset are credited/debited to the Financing and Investment
Income and Expenditure line in the year they incur in the CIES.
Going Concern
The Chief Finance Officer is responsible for making an annual assessment of whether it is appropriate to prepare the
accounts on a going concern basis.  In accordance with the Code of Practice on Local Authority Accounting in the United
Kingdom, an authority’s financial statements shall be prepared on a going concern basis; that is, the accounts should be
prepared on the assumption that the functions of the authority will continue in operational existence for at least twelve
months from the date of approval of the financial statements and it can only be discontinued under statutory prescription. 
The Council has significant net assets, investments and cash and a track record of preparing a balanced budget which
incorporates significant savings that are subsequently achieved.  The Council has put in place robust measures to
ensure the continuing strong financial management of its activities which demonstrates its ability to continue as a going
concern.  Taken together, the Chief Finance Officer has determined that it remains appropriate to prepare the financial
statements on a going concern basis.
Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third party contributions and donations are
recognised as due to the Council when there is reasonable assurance that:
• the Council will comply with the conditions attached to the payments; and
• the grants or contributions will be received.
Amounts recognised as due to the Council are not credited to the CIES until conditions attaching to the grant or
contribution have been satisfied.  Conditions are stipulations that specify that the future economic benefits or service
potential embodied in the asset acquired using the grant or contribution are required to be consumed by the recipient as
specified or future economic benefits or service potential must be returned to the transferor.
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance
Sheet as creditors.  When conditions are satisfied, the grant or contribution is credited to the relevant service line
(attributable revenue grants/contributions) or Taxation and Non-Specific Grant Income (non-ring-fenced revenue grants
and all capital grants) in the CIES.
Where capital grants are credited to the CIES, they are reversed out of the General Fund Balance in the MiRS.  Where
the grant has yet to be used to finance capital expenditure, it is posted to the Capital Grants Unapplied Account.  Where
it has been applied, it is posted to the CAA.  Amounts in the Capital Grants Unapplied Account are transferred to the CAA
once they have been applied to fund capital expenditure.
40 | Perth and Kinross Annual Accounts 2025/26 Page 59 of 314

Page 60

41 | Perth and Kinross Council Annual Accounts 2025/26 
Heritage Assets
Heritage Assets are those assets that are intended to be preserved in trust for future generations because of their
cultural, environmental or historical associations.  Heritage Assets include museum and gallery collections and works of
art.  These assets are held by the Council in pursuit of its overall objectives in relation to the maintenance of the heritage. 
Since 1 April 2016 Culture Perth and Kinross has responsibility for the delivery and development of museum and library
services in Perth and Kinross.  The Trust manages the museum and gallery collections on behalf of the Council;
however, the Council will continue to be custodian of the collections.
Tangible Heritage Assets 
The Council’s Heritage Assets are held in the Perth Museum, Perth Art Gallery and Alyth Museum.  The collections
include Art, History and Natural History and are held in support of Council objectives i.e. to increase knowledge,
understanding and appreciation of the local area and its history.  Heritage Assets are recognised and measured
(including the treatment of revaluation gains and losses) in accordance with the Council’s accounting policies on
property, plant and equipment.  
However, some of the measurement rules are relaxed in relation to heritage assets as detailed below.  The Council has
embarked upon a revaluation programme for all collection items deemed to have significant value, these being mainly
items within Fine and Applied Art collections.  In recognition of the key qualitative characteristics of the financial
statements, i.e. understandability, relevance, reliability and comparability, the Council has chosen to apply a £10,000 de-
minimus level for which items will be recognised within the Balance Sheet.  The exclusion of individual items having a
value of less than £10,000 does not impact upon the characteristics of the financial statements and a summary of the
main collections and applicable accounting treatment is as follows.
Art Collection
The Fine Art collection includes paintings and sketches in various mediums, and although international in scope, its
greatest strength is in the holding of Scottish pictures.  The collection seeks to retain a balance between the historical
and the contemporary whilst continuing to develop the holdings of works of specifically local interest.  The Applied Art
collection has been acquired since 1785 through purchase, gift or bequest.  It covers a wide variety of objects and
materials, within which the collections of Perth silver and Perthshire glass are unsurpassed in terms of national
importance. 
Subject to the de-minimus noted above, items donated or acquired are valued by the curators at point of acquisition; in
addition, there is a rolling programme of valuation to ensure all significant items in the Art collection are valued.  All
valuations are undertaken by the curators having relevant knowledge and experience and with reference to appropriate
commercial markets.
Art collection items are held in the Council balance sheet at market value and are tested annually for impairment, e.g.
where an item has suffered physical deterioration or breakage or where doubts arise as to its authenticity.  Any
impairment is recognised and measured in accordance with the Council’s general policies on impairment.
As the assets within the art collection are deemed to have indeterminate lives and a high residual value, the Council
does not consider it appropriate to charge depreciation.
History Collection
The History collection includes social history, archaeology, arms and armour, costume, archives, coins, medals and
stamps, photography and world cultures collections.  These items cannot be readily and/or reliably valued due to their
diverse nature.  The cost of valuation would be disproportionate in terms of any benefit derived to the user of the financial
statements and the History Collection is consequently excluded from the Council Balance Sheet.
Natural History Collection
The Natural History collection includes zoology, botany and geology collections.  No market exists for these items and
collections and there is no comparable data to form the basis of valuation.  The cost of obtaining valuations would be
disproportionate in terms of any benefit derived to the user of the financial statements and Natural History Collections are
consequently excluded from the Council Balance Sheet.
Heritage Assets – General
The Council may dispose of heritage assets which have a doubtful provenance or are unsuitable for public display.  The
proceeds of such items are accounted for in accordance with the Council’s general provisions relating to the disposal of
property, plant and equipment.  Disposal proceeds are disclosed separately in the notes to the financial statements and
are accounted for in accordance with statutory accounting requirements relating to capital expenditure and capital
receipts. 
41 | Perth and Kinross Annual Accounts 2025/26 Page 60 of 314

Page 61

42 | Perth and Kinross Council Annual Accounts 2025/26 
The promotion of other cultural events and programmes during the year makes it difficult to reliably estimate the
percentage of the Art Collection on display for public viewing.  All items not on display are held in secure storage and
access is permitted to scholars and others for research purposes.
The Culture Perth and Kinross Collections Management Framework provides guidance on the collection, disposal or
lending of heritage assets.  
Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the Council as a result of
past events (e.g. software licences) is capitalised when it is expected that future economic benefits or service potential
will flow from the intangible asset to the Council.  Internally generated assets are capitalised where it is demonstrable
that the project is technically feasible and is intended to be completed (with adequate resources being available) and the
Council will be able to generate future economic benefits or deliver service potential by being able to sell or use the
asset.  Expenditure is capitalised where it can be measured reliably as attributable to the asset and restricted to that
incurred during the development phase (research expenditure is not capitalised).  Expenditure on the development of
websites is not capitalised if the website is solely or primarily intended to promote or advertise the Council’s goods or
services.
Intangible assets are measured initially at cost.  Amounts are only revalued where the fair value of the assets held by the
Council can be determined by reference to an active market.  The depreciable amount of an intangible asset is amortised
over its useful life to the relevant service line(s) in the CIES. 
An asset is tested for impairment whenever there is an indication that the asset might be impaired – any losses
recognised are posted to the relevant service line(s) in the CIES.  Any gain or loss arising on the disposal or
abandonment of an intangible asset is posted to the Other Operating Expenditure line in the CIES.  Where expenditure
on intangible assets qualifies as capital expenditure for statutory purposes, amortisation, impairment losses and disposal
gains and losses are not permitted to have an impact on the General Fund Balance.  To comply with these restrictions,
the gain or loss on the derecognition of an intangible fixed asset shall be reversed out of the General Fund or Housing
Revenue Account.  The General Fund or Housing Revenue Account shall be debited (in the case of the gain) or credited
(in the case of a loss) with an amount equal to the gain or loss on derecognition of the intangible asset.  The gain or loss
that is reversed out of the General Fund or Housing Revenue Account excludes any costs of disposal that either cannot
be capitalised under regulation or statutory guidance or that the authority has chosen not to capitalise.  The double
entries are a credit to the capital receipts reserve or a capital grants and receipts unapplied account of an amount equal
to the disposal proceeds and a debit to the capital adjustment account equal to the carrying amount of the intangible
asset.
Interests in Companies and Other Entities
The Council has material interests in companies and other entities that have the nature of subsidiaries, associates and
jointly controlled entities and require it to prepare group accounts.  
Inventories
Inventories are included in the Balance Sheet at the lower of cost and net realisable value.  Work in progress is valued at
the cost of direct materials and labour plus attributable overheads based on the normal level of activity less any
attributable losses.  
Investment Properties
Investment properties are those that are used solely to earn rentals and/or for capital appreciation.  The definition is not
met if the property is used in any way to facilitate the delivery of services or production of goods or is held for sale. 
Investment properties are measured initially at cost and subsequently at fair value, being the price that would be received
to sell such an asset in an orderly transaction between market participants at the measurement date.  Properties are not
depreciated but are revalued annually according to market conditions at the year-end.  Gains and losses on revaluation
are posted to the Financing and Investment Income and Expenditure line in the CIES.  The same treatment is applied to
gains and losses on disposal.
Rentals received in relation to investment properties are credited to the Financing and Investment Income line and result
in a gain for the General Fund Balance.  However, revaluation and disposal gains and losses are not permitted by
statutory arrangements to have an impact on the General Fund Balance.  To comply with these restrictions, the gain or
loss on derecognition of an investment property shall be reversed out of the General Fund.  The General Fund shall be
debited (in the case of a gain) or credited (in the case of a loss) with an amount equal to the gain or loss on
derecognition of the investment property.  The double entries are a credit to the capital receipts reserve or a statutory
capital fund or capital grants and receipts unapplied account of an amount equal to the disposal proceeds and a debit to
the CAA equal to the carrying amount of the investment property.  
42 | Perth and Kinross Annual Accounts 2025/26 Page 61 of 314

Page 62

43 | Perth and Kinross Council Annual Accounts 2025/26 
Leases
Leases that are exempt from IFRS 16 (Right of Use Assets – see policy on page 46) are classified as operating leases.  
The Council as Lessee
Operating Leases - Rentals paid under operating leases are charged to the CIES as an expense of the services
benefitting from use of the leased property, plant or equipment.  Charges are made on a straight-line basis over the life of
the lease, even if this does not match the pattern of payments (e.g. there is a rent-free period at the commencement of
the lease).
The Council as Lessor
Operating Leases - Where the Council grants an operating lease over a property or an item of plant or equipment, the
asset is retained in the Balance Sheet.  Rental income is credited to the Other Operating Expenditure line in the CIES. 
Credits are made on a straight-line basis over the life of the lease, even if this does not match the pattern of payments
(e.g. there is a premium paid at the commencement of the lease).  Initial direct costs incurred in negotiating and
arranging the lease are added to the carrying amount of the relevant asset and charged as an expense over the lease
term on the same basis as rental income.  
Property, Plant and Equipment
Assets that have physical substance and are held for use in the production or supply of goods or services, for rental to
others or for administrative purposes and that are expected to be used during more than one financial year are classified
as Property, Plant and Equipment.
Recognition
Expenditure on the acquisition, creation or enhancement of Property, Plant and Equipment is capitalised on an accrual’s
basis, provided that it is probable that the future economic benefits or service potential associated with the item will flow
to the Council and the cost of the item can be measured reliably.  Expenditure that maintains but does not add to an
asset’s potential to deliver future economic benefits or service potential (e.g. repairs and maintenance) is charged as an
expense when it is incurred.  
Measurement
Assets are initially measured at cost, comprising:
• the purchase price;
• any costs attributable to bringing the asset to the location and condition necessary for it to be capable of operating
in the manner intended by management;
• the initial estimate of the costs of dismantling and removing the item and restoring the site on which it is located
where there is a legal or constructive obligation to do so.
The Council does not capitalise borrowing costs incurred whilst assets are under construction.  The cost of assets
acquired other than by purchase is deemed to be its fair value, unless the acquisition will not increase the cash flows of
the Council.  In the latter case, the cost of the acquisition is the carrying amount of the asset.
Donated assets are measured initially at fair value.  The difference between fair value and any consideration paid is
credited to the Taxation and Non-Specific Grant Income line of the Comprehensive Income and Expenditure Statement,
unless the donation has been made conditionally.  Until conditions are satisfied, the gain is held in the Donated Assets
Account.  Where gains are credited to the CIES, they are reversed out of the General Fund Balance to the CAA in the
MiRS.
Assets are then carried in the Balance Sheet using the following measurement bases:
• infrastructure and community assets  – depreciated historical cost;
• assets under construction – historical cost;
• dwellings – current value, determined using the basis of existing use value for social housing (EUV-SH).  The
Council values these assets using the Beacon approach (Adjusted Vacant Possession);
• other land and buildings – current value based on existing use value (EUV) for operational assets where there is
an active market, or if there is no market based evidence of current value because of the specialist nature of the
asset and/or the asset is rarely sold, depreciated replacement cost (DRC) using the instant build approach;
• surplus assets – the current value measurement base is fair value, estimated at highest and best use from a
market participant’s perspective;
• all other assets – current value, determined by the amount that would be paid for the asset in its existing use
(existing use value – EUV).
Assets included in the Balance Sheet at current value are indexed annually to ensure that their carrying amount is
adjusted to reflect market movements between the previous revaluation and the year-end, and are subject to formal
revaluation as a minimum every five years.  Increases in valuations are matched by credits to the Revaluation Reserve to
43 | Perth and Kinross Annual Accounts 2025/26 Page 62 of 314

Page 63

44 | Perth and Kinross Council Annual Accounts 2025/26 
recognise unrealised gains.  Exceptionally, gains might be credited to the surplus or deficit on the provision of services
where they arise from the reversal of a loss previously charged to a service.
Where decreases in value are identified, the revaluation loss is accounted for as follows:
• where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying amount of the
asset is written down against that balance (up to the amount of the accumulated gains);
• where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount of the asset is
written down against the relevant service line(s) in the Comprehensive Income and Expenditure Statement.
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007 only, the date of its formal
implementation.  Gains arising before that date have been consolidated into the Capital Adjustment Account.
Impairment
Assets are assessed at each year-end as to whether there is any indication that an asset may be impaired.  Where
indications exist and any possible differences are estimated to be material, the recoverable amount of the asset is
estimated and, where this is less than the carrying amount of the asset, an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for:
• where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying amount of the
asset is written down against that balance (up to the amount of the accumulated gains);
• where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount of the asset is
written down against the relevant service line(s) in the CIES.
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service line(s) in the CIES,
up to the amount of the original loss, adjusted for depreciation that would have been charged if the loss had not been
recognised.
Disposals and Assets Held for Sale
When it becomes probable that the carrying amount of an asset will be recovered principally through a sale transaction
rather than through its continuing use, it is reclassified as an Asset Held for Sale.  The asset is revalued immediately
before reclassification and then carried at the lower of this amount and fair value less costs to sell.  Where there is a
subsequent decrease to fair value less costs to sell, the loss is posted to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement.  Gains in fair value are recognised only up to the amount of any
previously recognised losses.  Depreciation is not charged on Assets Held for Sale.  Assets that are to be abandoned or
scrapped are not reclassified as Assets Held for Sale.
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet (whether
Property, Plant and Equipment or Assets Held for Sale) is written off to the Other Operating Expenditure line in the CIES
as part of the gain or loss on disposal.  
Receipts from disposals (if any) are credited to the same line in the CIES also as part of the gain or loss on disposal (i.e.
netted off against the carrying value of the asset at the time of disposal).  Any revaluation gains accumulated for the
asset in the Revaluation Reserve are transferred to the CAA.
Amounts received for a disposal are categorised as capital receipts.  The balance of receipts is required to be credited to
the Capital Receipts Reserve and can then only be used for new capital investment or set aside to reduce the Council’s
underlying need to borrow (the capital financing requirement).  Receipts are appropriated to the Reserve from the
General Fund Balance in the MiRS.  The written-off value of disposals is not a charge against council tax, as the cost of
fixed assets is fully provided for under separate arrangements for capital financing.  
Amounts are appropriated to the CAA from the General Fund Balance in the MiRS.  
44 | Perth and Kinross Annual Accounts 2025/26 Page 63 of 314

Page 64

45 | Perth and Kinross Council Annual Accounts 2025/26 
Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets by the systematic allocation of their depreciable
amounts over their useful lives.  An exception is made for assets without a determinable finite useful life (i.e. freehold
land and certain Community Assets) and assets that are not yet available for use (i.e. assets under construction).
Leasehold Properties over period of lease
Roads and Bridges 15-30 years
Other Infrastructure Assets 10-30 years
Vehicles, Plant and Equipment 3-15 years
Council Buildings up to 50 years
Council Dwellings 10-30 years
Intangible Fixed Assets 3-5 years
Where an item of Property, Plant and Equipment asset has major components whose cost is significant in relation to the
total cost of the item, the components are depreciated separately.  Revaluation gains are also depreciated, with an
amount equal to the difference between current value depreciation charged on assets and the depreciation that would
have been chargeable based on their historical cost being transferred each year from the Revaluation Reserve to the
General Fund.
Private Finance Initiative (PFI) and Similar Contracts
PFI and similar contracts are agreements to receive services, where the responsibility for making available the property,
plant and equipment needed to provide the services passes to the PFI contractor.  As the Council is deemed to control
the services that are provided under its PFI schemes the Council carries the assets used under the contracts on its
Balance Sheet as part of Property, Plant and Equipment.
The original recognition of these assets at fair value (based on the cost to purchase the property, plant and equipment)
was balanced by the recognition of a liability for amounts due to the scheme operator to pay for the capital investment. 
Non-current assets recognised on the Balance Sheet are revalued and depreciated in the same way as property, plant
and equipment owned by the Council.
The amounts payable to the PFI operators each year are analysed into five elements:
• fair value of the services received during the year – debited to the relevant service in the CIES;
• finance cost – an interest charge on the outstanding Balance Sheet liability, debited to the Financing and
Investment Income and Expenditure line in the CIES;
• contingent rent – increases in the amount to be paid for the property arising during the contract, debited to the
Financing and Investment Income and Expenditure line in the CIES;
• payment towards liability – applied to write down the Balance Sheet liability towards the PFI operator (the profile
of write-downs is calculated using the same principles as for a finance lease);
• lifecycle replacement costs – debited to the relevant service in the CIES.
Provisions
The Council is required to make provisions where an event has taken place that gives the Council a legal or constructive
obligation that probably requires settlement by a transfer of economic benefits or service potential, and a reliable
estimate can be made of the amount of the obligation.  Provision has been made for bad and doubtful debts in respect of
Council Tax, Housing Rents and other items of income, where appropriate.  In all cases the level of provision is based on
experience and an assessment of the prospects of recovering the related debt.  
Provisions are charged as an expense to the appropriate service line in the CIES in the year that the council becomes
aware of the obligation and measured at the best estimate at the balance sheet date of the expenditure required to settle
the obligation, taking into account relevant risks and uncertainties.  When payments are eventually made, they are
charged to the provision carried in the Balance Sheet.  Estimated settlements are reviewed at the end of each financial
year – where it becomes less than probable that a transfer of economic benefits will now be required (or a lower
settlement than anticipated is made), the provision is reversed and credited back to the relevant service.  Where some or
all of the payment required to settle a provision is expected to be recovered from another party (e.g. from an insurance
claim), this is only recognised as income for the relevant service if it is virtually certain that reimbursement will be
received if the council settles the obligation.
Reserves
Reserves are created by appropriating amounts out of the General Fund Balance in the Movement in Reserves
Statement.  When expenditure to be financed from a reserve is incurred, it is charged to the appropriate service in that
year against the Surplus/Deficit on the Provision of Services in the CIES.  The reserve is then appropriated back into the
General Fund Balance in the MiRS so that there is no net charge against council tax for the expenditure.  Certain
reserves are kept to manage the accounting processes for non-current assets, financial instruments and retirement
benefits and that do not represent usable resources for the Council – these reserves are explained in the relevant notes. 
45 | Perth and Kinross Annual Accounts 2025/26 Page 64 of 314

Page 65

46 | Perth and Kinross Council Annual Accounts 2025/26 
Revenue Expenditure Funded from Capital under Statute
Expenditure incurred during the year that may be capitalised under statutory provisions but does not result in the creation
of a non-current asset is charged as expenditure to the relevant Service in the CIES in the year.  Where the Council has
determined to meet the cost of this expenditure from existing capital resources or by borrowing, a transfer in the MiRS
from the General Fund Balance to the CAA then reverses out the amounts charged so that there is no impact on the level
of council tax.
Right of Use Assets
The Council has adopted IFRS 16 (Leases) with effect from 1 April 2024.  The adoption of the new
standard resulted in the balance sheet recognition of a right-of-use asset and related lease liability in relation to former
operating leases.  The Council has elected to apply recognition exemptions to low value assets (below £10,000 when
new) and to short-term leases i.e. existing leases that expire on or before 31 March 2027, and new leases with a duration
of less than 12 months.  A contract is, or contains a lease, if the contract conveys the right to control the use of an
identified asset for a period of time, including arrangements for nil consideration.
VAT
VAT payable is included as an expense only to the extent that it is not recoverable from His Majesty’s Revenue and
Customs.  VAT receivable is excluded from income.
2. Accounting Standards that have been issued but have not been adopted
At the balance sheet date, the following new standards and amendments to existing standards have been published but not
yet adopted by The Code:
• Amendments to FRS 102 The Financial Reporting Standard applicable in the UK and Republic of Ireland
(Amendments to Heritage assets) issued in March 2024
• Amendments to the Classification and Measurement of Financial Instruments (Amendments to IFRS 9
and IFRS 7) issued in May 2024
• Annual improvements to IFRS accounting standards – Volume 11 issued in July 2024
• Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) issued in
December 2024.
These standards apply to Perth and Kinross Council from 1 April 2026 and are not expected to have a significant impact on
the financial statements. 
3. Critical Judgements in Applying Accounting Policies
In applying the accounting policies set out in Note 1, the Council has had to make certain judgements about complex
transactions or those involving uncertainty about future events.  The critical judgements made in the Annual Accounts are:
Group Entities
The Council has an interest in a number of subsidiary and associate companies and trusts.  The most significant of these
companies in terms of the size of trading operations, shareholding and board representation and other factors have been
assessed and where deemed material to the Council, are included in the Group Accounts.  Full details of these interests are
shown in Note 1 to the Group Accounts.
Public Sector Funding
There is a high degree of uncertainty about future levels of funding for local government.  However, the Council has
determined that this uncertainty is not yet sufficient to provide an indication that the assets of the Council might be impaired
as a result of a need to close facilities and reduce levels of service provision.
Public Private Partnership (PPP)
The Council is deemed to control the services provided under the agreement for the provision of educational establishments. 
The accounting policies for PPP schemes and similar arrangements have been applied and the assets under the contract
are included within Property, Plant and Equipment on the Council’s Balance Sheet.  Note 36 provides further details.  
46 | Perth and Kinross Annual Accounts 2025/26 Page 65 of 314

Page 66

47 | Perth and Kinross Council Annual Accounts 2025/26 
4. Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty
The Annual Accounts contain estimated figures that are based on assumptions made by the Council about the future or that
are otherwise uncertain.  Estimates are made taking into account historical experience, current trends and other relevant
factors.  However, because balances cannot be determined with certainty, actual results could be materially different from
the assumptions and estimates.
The items in the Council’s Balance Sheet at 31 March 2026 for which there is a significant risk of material adjustment in the
forthcoming financial year are in respect of the Council’s Net Pensions Asset / Liability and valuation of Property, Plant and
Equipment.
Net Pension Liability
Uncertainty
Estimation of the net liability to pay pensions depends on a number of complex judgements relating to the discount rate
used, the rate at which salaries are projected to increase, changes in retirement ages, mortality rates and expected
returns on pension fund assets.  This is further detailed in Note 18 to the Accounts which includes a table setting out the
potential sensitivity of change in assumptions on the Pension Liability.  A firm of consulting actuaries is engaged to
provide the Council with expert advice about the assumptions to be applied.  
Effect if Actual Results Differ from Assumptions
The effects on the net pension asset / liability of changes in individual assumptions can be measured.  For instance, a
0.1% increase in the discount rate assumption would result in a reduction in the pension liability of £11.333 million. 
However, the assumptions interact in complex ways, and the pension asset had increased from £442.944 million in
2024/25 to £585.068 million in 2025/26.  However, by applying IAS 19 and the asset ceiling provision contained therein,
the Council has actually recognised a pension liability of £17.753 million in 2025/26 (£18.533 million in 2024/25). 
Property, Plant and Equipment - Valuations
Uncertainty
Although markets are functioning and transaction volumes are at levels where there is sufficient evidence on which to
base opinions on value, there remain uncertainties due to worldwide events which continue to influence pricing.
A combination of valuation reports provided by Royal Institution of Chartered Surveyors (RICS) registered valuers in the
current year, and indexation applied to previous professional valuations, have been used to inform the measurement of
non-current assets in these financial statements. 
Specialised assets such as educational buildings are valued on the basis of depreciated replacement cost.  Here the
valuer bases their assessment on the cost to the Council of replacing the service potential of the assets; the uncertainty
relates to the estimated costs of, rather than the extent of, service potential to be replaced.
The indexation of assets utilises the index considered as most suitable for the type of asset, as provided by the internal
RICS registered valuers.  Uncertainty relates to the potential for an alternative index that may be considered more
suitable, and which may provide for a different indexed movement in asset value.
The valuer has provided estimates for the range of uncertainty attached to the valuation of Council dwellings.  The
valuation of Council dwellings requires the use of an Adjustment Factor which is applied to the vacant possession value
of the housing stock to arrive at the reported Existing Use Value – Social Housing (EUV-SH).  The Adjustment Factor is
based on the ratio of private and public sector rents and yields.  Rental ratios are established from data provided by the
Council and from Local Housing Allowances, HM Rent Service, RICS, and using information on private sector rents from
research including local letting agents.  Information on yields is derived from the RICS, Building Society and Chartered
Surveyor firm publications, and government publications.
Effect if Actual Results Differ from Assumptions
A sensitivity analysis has been undertaken in respect of all properties revalued using indexation to determine the
potential movement in value had an alternative index been utilised.  For this purpose, alternative indices were not
identified and applied as there are a number of possibilities.  As a proxy, an increase and decrease of 1% has been
applied to reflect the potential movement, had an alternative index been adopted, which indicated an alternative
indexation adjustment.  Indexation calculations and the sensitivity analysis include assumptions that the Gross Internal
Area (GIA) and Land Area of each site remains unchanged, and the building use and condition remains in line with the
previous valuation.  The gross book value decrease when applying the selected indices is £12.542 million.  A 1%
decrease in index rates would result in a gross book value decrease of £19.680 million. 
A sensitivity analysis on the Council housing revaluation has been undertaken by the valuer to examine the potential
impact if the Adjustment Factor was increased or decreased by 5%, this being the tolerance listed within the valuation
guidance published by the Ministry for Housing Communities and Local Government (MHCLG).  The EUV–SH for the
Council housing stock at 31 March 2026 is £339.583 million.  A 5% increase or decrease to the Adjustment Factor would
result in an increase or decrease of £44.227 million (13.02%) to the value of the Council housing stock.  
47 | Perth and Kinross Annual Accounts 2025/26 Page 66 of 314

Page 67

48 | Perth and Kinross Council Annual Accounts 2025/26 
5. Adjustments between Accounting Basis and Funding Basis under Regulations
General Housing Capital Capital Total 2024/25
Fund Revenue Receipts Grants
Balance Account Reserve Unapplied
£'000 £'000 £'000 £'000 £'000 £'000
Adjustments involving the Capital Adjustment Account
Depreciation and impairment on non-current assets (49,997) (17,082) 0 0 (67,079) (59,925)
Revaluation Losses on Property, Plant and Equipment (18,570) (1,544) 0 0 (20,114) (11,888)
Reversal revaluation gains 4,737 247 0 0 4,984 1,301
Movements in Fair Value of Investment Properties 1,518 (85) 0 0 1,433 1,480
Amortisation of Intangible Assets (1,191) 0 0 0 (1,191) (1,232)
Capital grants and contributions credited to the
Comprehensive Income and Expenditure Statement 15,476 8,722 0 0 24,198 42,079
Amounts of non current assets written off on disposal
as part of the gain/loss (2,089) (217) 0 0 (2,306) (1,040)
Revenue Expenditure Funded by Capital Under Statute (202) 0 0 0 (202) (2,618)
Donated Assets 80 0 0 0 80 285
Items not debited or credited to the Comprehensive
Income and Expenditure Statement
Statutory provision for repayment of debt 14,313 3,503 0 0 17,816 16,321
Capital expenditure charged to the General Fund and
HRA balances 2,136 1,881 0 0 4,017 5,136
Adjustments involving the Capital Receipts Reserve
Transfer of sale proceeds credited as part of the
gain/loss on disposal 560 18 (578) 0 0 0
Use of the Capital Receipts Reserve to finance new
capital expenditure 0 0 404 0 404 1,672
Adjustments involving the Financial Instruments
Adjustment Account 487 136 0 0 623 626
Adjustments involving the Capital Grants unapplied
Application of grants unapplied 0 0 0 (215) (215) (1,060)
Adjustments involving the Pensions Reserve
Employer's pensions contributions and direct payments
to pensioners payable in the year 21,622 1,801 0 0 23,423 23,294
Reversal of items relating to retirement benefits debited
or credited to the Comprehensive Income and
Expenditure Statement (17,455) (1,482) 0 0 (18,937) (20,738)
Adjustments involving Short Term Accumulated
Absences Account
Amount by which officer remuneration charged to the
Comprehensive Income and Expenditure Statement on
an accruals basis is different from remuneration
chargeable in the year in accordance with statutory
requirements (227) (46) 0 0 (273) (1,186)
Total Adjustments (28,802) (4,148) (174) (215) (33,339) (7,493)
Usable Reserves
48 | Perth and Kinross Annual Accounts 2025/26 Page 67 of 314

Page 68

PKC - GENERAL#
6. Expenditure and Funding Analysis - 2025/26
Net
Net Expenditure
Expenditure Adjustments in the
charged to between the Comprehensive
the General Funding and Income and
Fund and HRA Accounting Expenditure
Balances Basis Statement
£000 £000 £000
Education and Learning 178,383 (1,029) 177,354
Health and Social Care 109,914 356 110,270
Children, Families and Justice 24,855 (189) 24,666
Economy, Development and Planning 15,766 6,715 22,481
Environment and Infrastructure 27,941 19,273 47,214
Housing and Communities 17,709 978 18,687
Property Services 49,602 36,230 85,832
Legal and Governance 3,960 45 4,005
Customer and Digital Services 11,983 5,579 17,562
Strategic Planning, People and Performance 5,218 3 5,221
Projects and Programmes 324 1 325
Finance and Business Support 9,074 (541) 8,533
Directorate Core Costs 572 4 576
Housing Revenue Account (9,686) 13,911 4,225
Valuation Joint Board 1,393 0 1,393
Non Distributed Costs 1,680 (1,680) 0
Cost of Services 448,688 79,656 528,344
Other Income and Expenditure (443,451) (42,321) (485,772)
Deficit on Provision of Services 5,237 37,335 42,572
Opening General Fund and HRA Balance (70,542)
Surplus on General Fund and HRA Balance in Year 5,237
Transfers from other Statutory Reserves 4,365
Service concession flexibility (2,746)
Closing General Fund and HRA Balance at 31 March 2026 (63,686)
This note provides a reconciliation of the main adjustments to Net Expenditure Chargeable to the General Fund and HRA Balances to
arrive at the amounts in the Comprehensive Income and Expenditure Statement. The relevant transfers between Reserves are explained
in the Movement in Reserves Statement.
The split of the General Fund and HRA Balance is in the Movement in Reserves Statement.
Notes to the Expenditure and Funding Analysis - adjustments between funding and accounting basis
Note A Note B Note C
£ '000 £ '000 £ '000 £ '000
COUNCIL SERVICES
Education and Learning (178) (734) (117) (1,029)
Health and Social Care 714 (441) 83 356
Children, Families and Justice 0 (253) 64 (189)
Economy, Development and Planning 6,803 (123) 35 6,715
Environment and Infrastructure 19,474 (267) 66 19,273
Housing and Communities 1,109 (133) 2 978
Property Services 36,195 0 35 36,230
Legal and Governance 0 0 45 45
Customer and Digital Services 5,578 0 1 5,579
Strategic Planning, People and Performance 0 0 3 3
Projects and Programmes 0 0 1 1
Finance and Business Support 9 (555) 5 (541)
Directorate Core Costs 0 0 4 4
Housing Revenue Account 14,186 (321) 46 13,911
Valuation Joint Board 0 0 0 0
Non Distributed Costs 0 (1,680) 0 (1,680)
Cost of Services 83,890 (4,507) 273 79,656
Other Operating Expenditure and Income 1,728 0 0 1,728
Financing and Investment Income and Expenditure (19,249) 21 (623) (19,851)
Taxation and Non-Specific Grant Income (24,198) 0 0 (24,198)
Other income and expenditure from the Expenditure and Funding
Analysis (41,719) 21 (623) (42,321)
Difference between General Fund surplus or deficit and
Comprehensive Income and Expenditure Statement Surplus or
Deficit on the Provision of Services
42,171 (4,486) (350) 37,335
Adjustments from General Fund to arrive at the Comprehensive Income
and Expenditure Statement amounts
Adjustments for
Capital Purposes
Net change for the
Pensions
Adjustments Other Differences Total Adjustments
49 | Perth and Kinross Annual Accounts 2025/26 Page 68 of 314

Page 69

PKC - GENERAL#
Net
Net Expenditure
Expenditure Adjustments in the
charged to between the Comprehensive
the General Funding and Income and
Fund and HRA Accounting Expenditure
Balances Basis Statement
£000 £000 £000
Education and Learning 166,361 1,613 167,974
Health and Social Care 96,045 1,183 97,228
Children, Families and Justice 23,770 237 24,007
Economy, Development and Planning 17,742 8,955 26,697
Environment and Infrastructure 31,860 18,014 49,874
Housing and Communities 18,544 482 19,026
Property Services 49,147 29,819 78,966
Legal and Governance 4,539 20 4,559
Customer and Digital Services 12,104 5,082 17,186
Strategic Planning, People and Performance 5,483 22 5,505
Projects and Programmes 282 1 283
Finance and Business Support 7,851 438 8,289
Directorate Core Costs 1,325 2 1,327
Housing Revenue Account (8,237) 11,039 2,802
Valuation Joint Board 1,434 0 1,434
Non Distributed Costs 1,689 (1,689) 0
Cost of Services 429,939 75,218 505,157
Other Income and Expenditure (416,393) (62,604) (478,997)
Deficit on Provision of Services 13,546 12,614 26,160
Opening General Fund and HRA Balance (86,054)
Surplus on General Fund and HRA Balance in Year 13,546
Transfers to other Statutory Reserves 4,880
Service concession flexibility (2,914)
Closing General Fund and HRA Balance at 31 March 2025 (70,542)
This note provides a reconciliation of the main adjustments to Net Expenditure Chargeable to the General Fund and HRA Balances to
arrive at the amounts in the Comprehensive Income and Expenditure Statement. The relevant transfers between Reserves are explained
in the Movement in Reserves Statement.
The split of the General Fund and HRA Balance is in the Movement in Reserves Statement.
Notes to the Expenditure and Funding Analysis - adjustments between funding and accounting basis
Note A Note B Note C
£ '000 £ '000 £ '000 £ '000
COUNCIL SERVICES
Education and Learning 751 199 663 1,613
Health and Social Care 791 287 105 1,183
Children, Families and Justice (5) 159 83 237
Economy, Development and Planning 8,838 82 35 8,955
Environment and Infrastructure 17,795 161 58 18,014
Housing and Communities 346 90 46 482
Property Services 29,785 0 34 29,819
Legal and Governance 2 0 18 20
Customer and Digital Services 5,037 0 45 5,082
Strategic Planning, People and Performance 0 0 22 22
Projects and Programmes 0 0 1 1
Finance and Business Support 14 387 37 438
Directorate Core Costs 0 0 2 2
Housing Revenue Account 10,998 4 37 11,039
Valuation Joint Board 0 0 0 0
Non Distributed Costs 0 (1,689) 0 (1,689)
Cost of Services 74,352 (320) 1,186 75,218
Other Operating Expenditure and Income 138 0 0 138
Financing and Investment Income and Expenditure (17,801) (2,236) (626) (20,663)
Taxation and Non-Specific Grant Income (42,079) 0 0 (42,079)
Other income and expenditure from the Expenditure and Funding
Analysis (59,742) (2,236) (626) (62,604)
Difference between General Fund surplus or deficit and
Comprehensive Income and Expenditure Statement Surplus or
Deficit on the Provision of Services
14,610 (2,556) 560 12,614
Total Adjustments
Expenditure and Funding Analysis - 2024/25
Adjustments from General Fund to arrive at the Comprehensive Income
and Expenditure Statement amounts
Adjustments for
Capital Purposes
Net change for the
Pensions
Adjustments Other Differences
50 | Perth and Kinross Annual Accounts 2025/26 Page 69 of 314

Page 70

51 | Perth and Kinross Council Annual Accounts 2025/26 
Note 6 cont’d
Explanation to the Expenditure and Funding Analysis
Adjustments for Capital Purposes 
Note A  Adjustments for Capital Purposes adds in depreciation and impairment and revaluation gains and
losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal
of assets and the amounts written off for those assets.
• Financing and investment income and expenditure – the statutory charges for capital
financing and other revenue contributions are deducted from other income and expenditure as
these are not chargeable under generally accepted accounting practices.
• Taxation and non-specific grant income and expenditure – capital grants are adjusted for
income not chargeable under generally accepted accounting practices.  Revenue grants are
adjusted from that receivable in the year to that receivable without conditions or for which
conditions were satisfied throughout the year.  The Taxation and Non Specific Grant Income and
Expenditure line is credited with capital grants receivable in the year without conditions or for
conditions which were satisfied in the year.
Net Change for the Pensions Adjustments
Note B  Net change for the removal of pension contributions and the addition of IAS 19 Employee Benefits
pension related expenditure and income:
• For services – this represents the removal of the employer pension contributions made by the
authority as allowed by statute and the replacement with current service costs and past service
costs.
• For Financing and investment income and expenditure – the net interest on the defined
benefit liability is charged to the Comprehensive Income and Expenditure Statement.
Other Differences
Note C  Other differences between the amounts debited/credited to the Comprehensive Income and
Expenditure Statement and amounts payable/receivable to be recognised under statute:
• For services – this represents the removal of the increase or decrease in the employee statutory
adjustment account.
• For Financing and investment income and expenditure – the other differences column
recognises adjustments to the General Fund for the timing differences for premiums and
discounts and stepped interest rate loans.  
51 | Perth and Kinross Annual Accounts 2025/26 Page 70 of 314

Page 71

52 | Perth and Kinross Council Annual Accounts 2025/26 
7. Transfer (to)/from Earmarked Reserves
The Reserves Strategy that the Council approved in February 2026 earmarked funding towards specific or known future
commitments.  The following table sets out the updated balances as at 31 March 2026 for these Earmarked Reserves taking
cognisance of the final year-end position.  
Balance as at Transfers Balance as at
1 April 2025 (In)/Out 31 March 2026
£'000 £'000 £'000
Revenue Grants (13,355) 1,269 (12,086)
Affordable Housing (Resources accrued from
reduced Council Tax Discounts) (4,796) (1,452) (6,248)
Developer Contributions: Commuted Sums and
Infrastructure and Affordable Housing (5,829) 350 (5,479)
Transformation and Workforce Management (4,837) 305 (4,532)
Service concession flexibility (13,262) 10,262 (3,000)
Waste Initiatives 0 (1,894) (1,894)
Non-Recurring Pressures b/f from previous years (1,483) (178) (1,661)
Anti-Poverty Measures (1,313) (107) (1,420)
Car Parking (977) (101) (1,078)
Social Care 0 (1,000) (1,000)
Future Legal Claims 0 (1,000) (1,000)
Community Resilience 0 (800) (800)
Communities (1,003) 280 (723)
Devolved School Management (DSM) (527) (15) (542)
Culture (499) 105 (394)
School Estate (311) 58 (253)
Climate Change (295) 49 (246)
Works Maintenance (200) 0 (200)
Local Government Elections (106) (53) (159)
Modern Apprentices/Graduate Trainees (186) 72 (114)
Salix Fund (75) (3) (78)
Financial Assistance (40) (20) (60)
Community Investment Fund (61) 15 (46)
Child Abuse (50) 11 (39)
Local Action Partnerships (36) 6 (30)
Pullar House Lifecycle 0 (30) (30)
School Counsellors (151) 124 (27)
Property Maintenance (80) 76 (4)
Events (97) 97 0
Earmarked Balances (49,569) 6,426 (43,143)
Purpose of Earmarked General Fund Balances
The application and monitoring of the following reserves is part of the remit of the Finance and Resources Committee.
Revenue Grants – these grants are being carried forward in reserves as the grant conditions have been met but the
expenditure has not been fully incurred.
Affordable Housing (Resources accrued from reduced Council Tax Discounts) – these reserves have been generated
as a result of the Council’s policy on varying the level of council tax charged for long term empty properties and second
homes.  These resources can only be used for the provision of affordable housing.
Developer Contributions: Commuted Sums and Infrastructure and Affordable Housing – the Environment,
Infrastructure and Economic Development Committee approved supplementary guidance on 20 September 2023 for
developer contributions covering community greenspace, primary education, Auchterarder A9 junction improvements,
affordable housing and transport infrastructure.  These sums are held in the Council’s Reserves until they are applied to
relevant schemes.  
Transformation and Workforce Management – the Council has resources earmarked to enable the Transformation and
Change Strategy and workforce management in future years.
Service Concession flexibility – these resources are earmarked to be phased over a number of years to contribute to the
funding of the Revenue Budget.
Waste Initiatives – the Finance and Resources Committee has approved earmarking resources to support waste initiatives
in 2026/27 and 2027/28.
Non-Recurring Pressures b/f from previous years - the 2026/27 Revenue Budget includes non-recurring expenditure
proposals which have been approved during the year at Finance and Resources Committee and as part of the year end
process.
52 | Perth and Kinross Annual Accounts 2025/26 Page 71 of 314

Page 72

53 | Perth and Kinross Council Annual Accounts 2025/26 
Anti-Poverty measures – The Council approved the creation of a COVID-19 Reserve on 27 January 2021 (Report 21/8
refers) to assist with addressing the ongoing impact of Covid-19 in future years.  This has now been redirected towards Anti-
Poverty measures.
Car Parking – this balance is the accumulated surplus at 31 March 2026 which is restricted in its application under the Road
Traffic Regulation Act 1984.  Any proposals to utilise these resources will require approval by the Finance and Resources
Committee.
Social Care – The 2026/27 revenue budget approved earmarking £1 million towards the future costs of social care.
Future Legal Claims – the Finance and Resources Committee in June 2026 approved earmarking £1 million for any
potential future legal claims if they arise.
Community Resilience – the 2025/26 revenue budget created a reserve for future community resilience expenditure.
Communities – the Finance and Resources Committee in April 2025 approved the allocation of any resources above 4% of
unearmarked reserves at year end towards a reserve for Communities.
Devolved School Management (DSM) – the amount shown is the accumulated sum available to be carried forward at 31
March 2026 under the approved scheme for managing these budgets.  The purposes for which the earmarked amount can
be used and the procedures for its management and control are detailed in the Council’s approved DSM scheme.
Culture – these resources continue to be earmarked for cultural initiatives across the Council.
School Estate – These resources include amounts previously approved by the Council for the primary and secondary
school estate including maintenance works and resources for new schools.
Climate Change – the Finance and Resources Committee in April 2023 approved the earmarking of resources for climate
change activities due to a rephasing between years. 
Works Maintenance – The Council continues to earmark resources for future works maintenance.  
Local Government Elections – These resources are earmarked in reserves as a contribution to local elections.  
Modern Apprentices/Graduate Trainees – the Strategic Policy and Resources Committee approved the transfer of any
final under spend on modern apprentices and graduate trainees.  The remaining resources will be utilised in future years.
Financial Assistance – There is a recurring annual contribution from reserves to fund any future Mods and other events
across Perth and Kinross.
Salix Fund – Salix Finance Ltd is a Government owned non-departmental public body which provides interest free loan
funding for energy efficiency works.  The loan is re-paid to the fund over a number of years and re-invested in future energy
efficiency works.
Community Investment Fund – The Council continues to earmark the resources remaining from the fund for future
investment. 
Child Abuse – the 2025/26 revenue budget approved the earmarking of resources in respect of future costs incurred in
preparing for public hearings in respect of investigations into Child Abuse arising from residential care claims.
Local Action Partnership – these resources are earmarked and utilised by an application process for payment to groups in
one of the seven local action partnerships.
Pullar House Lifecycle – the Finance and Resources Committee in June 2026 earmarked lifecycle costs for future
expenditure to be incurred within the Pullar House building.
School Counsellors – Revenue Budget 2020/21 Update No 2 to the Strategic Policy and Resources Committee approved
the earmarking of resources received from the Scottish Government in respect of counselling in schools which are
anticipated to be spent during 2026/27 (Report 20/225).
Property Maintenance – Revenue Budget Report No 3 to the Strategic Policy and Resources Committee on 21 November
2021 approved the earmarking of £250,000 resources in respect of property maintenance to be utilised in future years.  This
was increased by a further £55,000 in 2021/22.
The remaining earmarked reserve detailed in the table were fully utilised or un-earmarked during 2025/26. 
Events- the Finance and Resources Committee in April 2025 approved earmarking £97,000 for future events from resources
received in respect of an insurance claim in respect of the Christmas Light switch on. 
8. Other Operating Expenditure / Income
2025/26 2024/25
£'000 £'000
Losses and (Gains) on the Disposal of Non Current Assets 1,728 138
Share of Tayside Contracts Surplus (769) (244)
Total 959 (106)
53 | Perth and Kinross Annual Accounts 2025/26 Page 72 of 314

Page 73

54 | Perth and Kinross Council Annual Accounts 2025/26 
9. Financing and Investment Income and Expenditure
2025/26 2024/25
£'000 £'000
Interest payable and similar charges 27,531 25,029
Pensions interest cost and expected return on pensions assets 21 (2,236)
Interest receivable and similar income (1,172) (994)
Income in relation to investment properties and changes in their fair value (2,339) (2,369)
Total 24,041 19,430
10. Taxation and Non Specific Grant Income
Restated
2025/26 2024/25
£'000 £'000
Council Tax Income (109,802) (100,379)
Non Domestic Rates (63,537) (64,717)
Non Ring-fenced Government Grants (313,235) (291,146)
Capital Grants and Contributions (24,198) (42,079)
Total (510,772) (498,321)
Non-Domestic Rates Income in 2024/25 was restated for the costs of discretionary relief which are included within Finance
and Business Support rather than netted off Non-Domestic Rate Income.
11. Material Items of Income and Expense
In 2025/26 the Council did not receive any material items of income or expenditure not otherwise disclosed in the financial
statements and notes.  There were no material items of income or expenditure in 2025/26 not otherwise disclosed.  
12. Premiums and Discounts on Debt Rescheduling Written Down
The Code requires that any premiums or discounts arising from debt rescheduling should be written off in the year they were
incurred, except in limited circumstances where they would qualify as a ‘modification’ of debt.  During 2025/26 there were no
such debt modifications, however a total of £2.901 million of premiums were incurred and £5.945 million of discounts
received, following the early repayment of debt and charged in full in 2025/26. 
The net amount of premium and discount debited to the General Fund and HRA, including for transactions prior to 1 April
2007 (as permitted by statutory guidance), from the Financial Instruments Adjustment Account was £492,000 (2024/25
£604,000).
13. General Grants, Bequests and Donations
Perth and Kinross Council is represented on, exercises influence over and provides grants to a large number of outside
bodies which provide services to the public, consistent with the Council’s statutory responsibilities.
During 2025/26 a total of £22.542 million (2024/25 £21.984 million) was paid out in support of these organisations ranging
from remission of hall rents of a few pounds to the contribution towards the operational and other costs of Live Active Leisure
Limited of £4.963 million (2024/25 £4.894 million).  Details of grants are shown below.
54 | Perth and Kinross Annual Accounts 2025/26 Page 73 of 314

Page 74

55 | Perth and Kinross Council Annual Accounts 2025/26 
2025/26 2024/25
£'000 £'000
Service Level Agreements with Outside Organisations 8,833 8,674
Live Active Leisure Limited 4,963 4,894
Culture Perth and Kinross 3,925 3,919
Perth Theatre and Concert Hall Ltd 1,068 1,056
Green Capital Recovery Fund 254 547
Perth Money Advice Service 413 413
Community Investment Fund 0 326
Churches Action for the Homeless 304 290
Pitlochry Festival Theatre 220 220
Commercial Property Regeneration Grants 311 210
Warm Spaces Grant 150 191
Local Action Partnerships 0 114
Perthshire Women's Aid 110 108
Perth and Kinross Heritage Trust 80 100
Perth and Kinross Countryside Trust 30 100
Other Miscellaneous Grants 1,881 822
Total 22,542 21,984
14. Expenditure and Income Analysed by Nature
The Council’s expenditure and income is analysed as follows:
2025/26 2024/25
Expenditure / Income £'000 £'000
Expenditure
Employee benefits expenses 283,152 270,615
Other services expenses 297,636 287,763
Contribution to Integrated Joint Board 105,639 92,223
Support service recharges 6,900 4,715
Depreciation, amortisation, impairment 87,785 77,155
Interest payments 28,506 25,079
Loss on the disposal of assets 1,728 138
Total Expenditure 811,346 757,688
Income
Fees, charges and other service income 212,254 188,246
Interest and investment income 4,465 5,649
Taxation and Non-Specific Grant income 510,772 498,321
Grants and contributions 41,283 39,312
Total Income 768,774 731,528
Deficit on the Provision of Services 42,572 26,160
15. Agency Services
Agency arrangements operate in some Services where the Council undertakes work on behalf of other local authorities;
Scottish Water; government; and other public bodies.  The Council received £561,000 in 2025/26 (£554,000 in 2024/25) in
relation to the administration of collecting Scottish Water income on their behalf.  This has been recognised in the
Comprehensive Income and Expenditure Statement. 
55 | Perth and Kinross Annual Accounts 2025/26 Page 74 of 314

Page 75

56 | Perth and Kinross Council Annual Accounts 2025/26 
16. External Audit Costs
2025/26 2024/25
£'000 £'000
External Audit Fees 372 358
17. Termination Benefits
The Council terminated the contracts of nine employees in 2025/26, incurring costs of £172,000 (nineteen employees in
2024/25, incurring costs of £601,000).
18. Post-Employment Benefits
International Accounting Standard 19 ‘Employee Benefits’ (IAS 19) prescribes how pension costs and liabilities are to be
disclosed in the financial statements.  The standard requires employing organisations to account for post-employment
benefits in the period in which they are committed to give them, even if the actual payment of these benefits will be many
years in the future.  The following notes are prepared in accordance with the code guidance on disclosure requirements in
respect of IAS 19. 
Perth and Kinross Council participates in two different pension schemes, one for teaching staff and a separate scheme for all
other employees.
Pensions Schemes Accounted for as Defined Contribution Schemes
Teachers
Teachers employed by the Council are members of the Teachers’ Pension Scheme, administered by the Scottish
Government.  The Scheme provides teachers with specified benefits upon their retirement, and the Council contributes
towards the costs by making contributions based on a percentage of members’ pensionable salaries.  
The scheme is technically a defined benefit scheme.  However, the Scheme is unfunded, and the Scottish Government uses
a notional fund as the basis for calculating the employers’ contribution rate paid by local authorities.  The Council is not able
to identify its share of the underlying financial position and performance of the scheme with sufficient reliability for accounting
purposes.  For the purposes of the Annual Accounts, it is therefore accounted for on the same basis as a defined
contribution scheme.
In 2025/26, the Council paid £20.609 million to the Teachers’ Pensions scheme in respect of teachers’ retirement benefits,
representing 26% of pensionable pay.  The figures for 2024/25 were £19.608 million and 26%.  There were no contributions
remaining payable at the year-end.  Additional payments relating to added year’s benefits, which the Council has inherited
from predecessor authorities or awarded itself, together with related increases, amounted to £158,056 (2024/25 £172,461).
Pension Schemes Accounted for as Defined Benefit Pension Schemes
Local Government Pension Scheme
The post-employment scheme for other employees, subject to certain qualifying criteria, is the Local Government Pension
Scheme (LGPS) which is administered in this area by Dundee City Council in respect of all local authorities and admitted
bodies in the former Tayside area.  This is a multi-employer scheme in which it is possible for an employer to identify its
share of the assets and liabilities on a consistent and reasonable basis.  Employer’s liabilities can be evaluated directly by
the Actuary at any time on membership data.
Benefits
• It is a Career Average Revalued Earnings scheme, meaning that the Council and employees pay contributions into a
fund, calculated at a level to balance the pension’s liability with investment assets.
• The pension’s accrual rate guarantees a pension based on 1/49th of career average revalued earnings and years of
pensionable service.  There is no automatic entitlement to a lump sum.  Members may opt to give up (commute)
pension for lump sum up to the limit set by the Finance Act 2004.  Pensions are increased annually in line with
changes to the Pensions (Increases) Act 1971 and Section 59 of the Social Security Pensions Act 1975.
Governance
• The Tayside Pension Fund is operated under the regulatory framework for the LGPS in Scotland and the governance
of the scheme is the responsibility of the Tayside Pension Fund Committee.  This Committee is comprised solely of
elected members of Dundee City Council.  Employing authorities (including Perth and Kinross Council) are
represented at the Tayside Pension Board.  
• Policy is determined in accordance with the Local Government Pension Scheme (Scotland) Regulations. 
Management of the Fund’s investments is carried out by the Fund’s Investment Advisory Panel which selects and
appoints a number of external investment managers/partners and monitors their investment performance.
56 | Perth and Kinross Annual Accounts 2025/26 Page 75 of 314

Page 76

57 | Perth and Kinross Council Annual Accounts 2025/26 
• Under the Regulations, employers fall into three categories, scheme employers (also known as scheduled bodies)
such as Perth and Kinross Council, community admission bodies and transferee admission bodies.  Admission
agreements are generally assumed to be open-ended.  However, either party can voluntarily terminate the admission
agreement by giving an appropriate period of notice to the other parties.  Any deficit arising from the cessation
valuation will usually be levied on the departing admission body as a capital payment.
Principal Risks
• The principal risks to the scheme are the longevity assumptions, statutory changes to the scheme, changes to
inflation, bond yields and the performance of the investments held by the scheme.  These are mitigated to a certain
extent by the statutory requirements to charge the General Fund the amount due by statute as described in the
accounting policy note.
Discretionary Post-employment Benefits
• Discretionary post-retirement benefits on early retirements are an unfunded defined benefit arrangement, under
which liabilities are recognised when an award is made.  There are no plan assets built up to meet these pension
liabilities.
The contributions paid into the scheme by employees and member pension benefits are prescribed, for the period to which
the accounts relate, by the Local Government Pensions Scheme (Scotland) Regulations 1998 as amended.  Perth and
Kinross Council’s contributions, as an employer, into the Tayside Pension Fund are subject to the advice of the Fund actuary.
The Local Government Pension Scheme allows for the award of discretionary post-employment benefits upon early
retirement.  This is an unfunded defined benefit final arrangement, under which liabilities are recognised when awards are
made.  However, there are no investment assets built up to meet the pension’s liabilities, and cash has to be generated to
meet actual pension’s payments as they eventually fall due.
Guaranteed Minimum Pension (GMP) Equalisation
As a result of the High Court’s Lloyds ruling on the equalisation of GMPs between genders, a number of pension schemes
have made adjustments to accounting disclosures to reflect the effect this ruling has on the value of pension liabilities.  It is
our understanding that HM Treasury has confirmed that the judgement "does not impact on the current method used to
achieve equalisation and indexation in public service pension schemes". 
On 23 March 2021, the Government published the outcome to its Guaranteed Minimum Pension Indexation consultation,
concluding that all public service pension schemes, including the LGPS, will be directed to provide full indexation to
members with a GMP reaching State Pension Age (SPA) beyond 5 April 2021.  This is a permanent extension of the existing
‘interim solution’ that has applied to members with a GMP reaching SPA on or after 6 April 2016.
The Council’s valuation assumption for GMP is that the Fund will pay limited increases for members that have reached SPA
by 6 April 2016, with the Government providing the remainder of the inflationary increase.  For members that reach SPA after
this date, the Council has assumed that the Fund will be required to pay the entire inflationary increase.  This assumption is
consistent with the consultation outcome and the actuaries do not believe that it is necessary to make any adjustments to
the value placed on the liabilities as a result of the above outcome.
Career Average Revalued Earnings Scheme (CARE)
The Local Government Pension Scheme changed from Final Salary to Career Average Revalued Earnings (CARE) on 1
April 2015, with a change of accrual rate from 1/60th to 1/49th.  Employees who were previously paying into the Final Salary
scheme were automatically transferred into the new CARE scheme on 1 April 2015.  
Transactions Relating to Post-Employment Benefits
The Council recognises the cost of retirement benefits in the reported cost of services when they are earned by employees,
rather than when the benefits are eventually paid as pensions.  However, the charge the Council is required to make against
Council Tax is based on the cash payable in the year, so the real cost of post-employment/retirement benefits is reversed out
of the General Fund via the Movement in Reserves Statement.  
The following transactions have been made in the Comprehensive Income and Expenditure Statement and the General
Fund Balance via the Movement in Reserves Statement during the year.
57 | Perth and Kinross Annual Accounts 2025/26 Page 76 of 314

Page 77

58 | Perth and Kinross Council Annual Accounts 2025/26 
Local Government Pension Scheme 2025/26 2024/25
£'000 £'000
Comprehensive Income and Expenditure Statement
Cost of Services
- Service Cost 18,916 22,974
Financing and Investment Income and Expenditure
- Net Interest on the Defined Liability (429) (2,599)
Administration Expenses 450 363
Total Post Employment Benefit Charged to the Deficit on the Provision of Services 18,937 20,738
Remeasurement of the net defined benefit liability comprising:
Expected return on pension fund assets in excess of interest (87,874) 24,909
Changes in demographic assumptions 7,240 (2,446)
Changes in financial assumptions (34,786) (124,687)
Experience (gain)/loss on defined benefit obligation 2,582 (2,282)
Changes in effect of asset ceiling 116,544 104,847
Total Post Employment Benefit Credited to the Comprehensive Income and Expenditure
Statement 3,706 341
Movement in Reserves Statement
Reversal of Net Charges made to the surplus or deficit on the provision of Services for post-
employment benefits in accordance with the Code (18,937) (20,738)
IAS 19 limits the measurement of a net defined benefit asset to the lower of the surplus in the defined benefit plan and the
asset ceiling.  IAS 19 defines the asset ceiling as the present value of any economic benefits available in the form of
reductions in future contributions to the plan.  In accordance with International Financial Reporting Interpretations Committee
- Interpretation 14 (IFRIC 14), the actuary has calculated the impact of the asset ceiling as £585.068 million (2024/25
£442.994 million).  Therefore, a corresponding reduction has been applied to the defined benefit plan asset which results in
a pension net liability of £17.753 million (2024/25 £18.533 million).
Pensions Assets and Liabilities Recognised in the Balance Sheet
The amount included in the Balance Sheet arising from the Council’s obligation in respect of its defined benefit scheme is as
follows:
31 March 31 March
2026 2025
£'000 £'000
Present Value of the Defined Benefit Obligation 771,014 764,472
Present Value of Unfunded Obligation 17,753 18,533
Closing Defined Benefit Obligation 788,767 783,005
Impact of Asset Ceiling 585,068 442,994
Fair Value of Pension Fund Assets (Bid Value) (1,356,082) (1,207,466)
Net Liability in Balance Sheet 17,753 18,533
58 | Perth and Kinross Annual Accounts 2025/26 Page 77 of 314

Page 78

59 | Perth and Kinross Council Annual Accounts 2025/26 
A reconciliation of Perth and Kinross Council’s share of the present value of Tayside Pension Fund’s defined benefit
obligation (liabilities) is as follows:
31 March 31 March
2026 2025
£'000 £'000
Opening Defined Benefit Obligation 783,005 875,216
Current Service Cost 18,522 22,308
Interest Cost 43,398 43,135
Change in Financial Assumptions (34,786) (124,687)
Change in demographic assumptions 7,240 (2,446)
Experience Gain on Defined Benefit Obligation 2,582 (2,282)
Estimated Benefits Paid Net of Transfers In (37,949) (35,398)
Past Service Costs (including Curtailments) 394 666
Contributions by Scheme Participants 8,162 8,197
Unfunded Pensions Payments (1,801) (1,704)
Closing Defined Benefit Obligation 788,767 783,005
A reconciliation of the movements in Perth and Kinross Council’s share of the fair value of Tayside Pension Fund’s assets is
as follows:
31 March 31 March
2026 2025
£'000 £'000
Opening Fair Value of Scheme Assets 1,207,466 1,175,381
Interest on Assets 69,357 62,968
Return on Assets Less Interest 87,874 (24,909)
Administration Expenses (450) (363)
Contributions by Employer Including Unfunded 23,423 23,294
Contributions by Scheme Participants 8,162 8,197
Estimated Benefits Paid Plus Unfunded Net of Transfers (Out)/In (39,750) (37,102)
Closing Fair Value of Scheme Assets 1,356,082 1,207,466
31 March 31 March
2026 2025
£'000 £'000
Opening Impact of Asset Ceiling 442,994 320,913
Interest on impact of Asset Ceiling 25,530 17,234
Actuarial Losses 116,544 104,847
Closing Impact of Asset Ceiling 585,068 442,994
Perth and Kinross Council’s share of Tayside Pension Fund’s assets at 31 March 2026 comprised:
£'000 % £'000 %
Equities 1,016,841 75% 801,957 66%
Gilts 82,155 6% 77,015 6%
Other Bonds 83,931 6% 79,510 7%
Property 135,688 10% 183,216 15%
Cash 36,656 2% 65,449 5%
Alternatives 811 1% 319 1%
Total 1,356,082 100% 1,207,466 100%
31 March 2026 31 March 2025
59 | Perth and Kinross Annual Accounts 2025/26 Page 78 of 314

Page 79

60 | Perth and Kinross Council Annual Accounts 2025/26 
A further breakdown of the assets is as follows:
Equities
Consumer 6% 8%
Manufacturing 7% 7%
Energy and Utilities 3% 2%
Financial Institutions 7% 8%
Health and Care 4% 5%
Information Technology 13% 10%
Others 0% 0%
40% 40%
Debt Securities
Corporate Bonds 4% 4%
UK Government Bonds 0% 0%
Others 0% 1%
4% 5%
Private Equity 2% 2%
Property
UK Property 10% 10%
10% 10%
Investment Fund Unit Trusts
Equities 29% 27%
Bonds 6% 6%
Infrastructure 6% 5%
41% 38%
Cash and Cash Equivalents 3% 5%
Total 100% 100%
31 March 2026 28 February 2025
Basis for Estimating Assets and Liabilities
Liabilities have been assessed on an actuarial basis using the projected unit credit method, an estimate of the pensions that
will be payable in future years dependent on assumptions about mortality rates, salary levels, etc.  Both the Local
Government Pension Scheme and Discretionary Benefits liabilities have been assessed by Barnett Waddingham Public
Sector Consulting, an independent firm of actuaries.  Estimates for the Tayside Pension Fund are based on the latest full
valuation of the scheme as at 31 March 2023.
The principal assumptions used by the actuary have been:
2025/26 2024/25
Mortality Assumptions
Longevity at 65 for Current Pensioners:
- Men 19.4 18.8
- Women 21.9 21.7
Longevity at 65 for Future Pensioners:
- Men 20.7 20.2
- Women 23.4 23.2
Rate of Increase in Salaries 3.9% 3.9%
Rate of Increase in Pensions 2.9% 2.9%
Rate for Discounting Scheme Liabilities 6.1% 5.8%
The liabilities show the underlying commitments that the Council has in the long run to pay post-employment (retirement)
benefits.  The net liability of £17.753 million has a substantial impact on the net worth of the Council as recorded in the
Balance Sheet.  However, statutory arrangements for funding the deficit mean that the financial position of the Council
remains sound:
- Finance is only required to be raised to cover discretionary benefits when the pensions are actually paid. 
The total contribution expected to be made to the Local Government Pension Scheme by the Council in the year to 31
March 2027 is £21.061 million.  
60 | Perth and Kinross Annual Accounts 2025/26 Page 79 of 314

Page 80

61 | Perth and Kinross Council Annual Accounts 2025/26 
Sensitivity Analysis
The estimation of the defined benefit obligations is sensitive to the actuarial assumptions set out in the tables above.  The
sensitivity analysis below have been determined based on reasonably possible changes of the assumptions occurring at the
end of the reporting period and assumes for each change that the assumption analysed changes while all the other
assumptions remain constant.  In practice, this is unlikely to occur, and changes in some of the assumptions may be
interrelated.  The estimations in the sensitivity analysis have followed the accounting policies for the scheme, i.e. on an
actuarial basis using the projected unit credit method.  The methods and types of assumptions used in preparing the
sensitivity analysis below did not change from those used in the previous period. 
£m £m £m £m £m
Adjustment to discount rate +0.5% +0.1% 0% -0.1% -0.5%
- Present value of total obligation  734.695 777.434 788.767 800.377 849.755
- Projected Service cost  15.164 17.031 17.878 18.472 21.044      
Adjustment to long term salary increase +0.5% +0.1% 0% -0.1% -0.5%
- Present value of total obligation  794.450 789.888 788.767 787.655 783.283
- Projected Service cost  17.878 17.878 17.878 17.878 17.878      
Adjustment to pension increases and
deferred revaluation
+0.5% +0.1% 0% -0.1% -0.5%
- Present value of total obligation  843.891 799.269 788.767 778.513 739.826
- Projected Service cost  21.084 18.481 17.878 17.291 15.111 
£m £m £m
Adjustment to mortality age rating assumption + 1 year None -1 year
Present value of total obligation  816.213 788.767 762.387
Projected Service cost  18.494 17.878 17.276 
19. Related Parties
The Council is required to disclose material transactions with related parties – bodies or individuals that have the potential
to control or influence the Council or to be controlled or influenced by the Council.  Disclosure of these transactions allows
readers to assess the extent to which the Council might have been constrained in its ability to operate independently or
might have secured the ability to limit another party’s ability to bargain freely with the Council.
Scottish Government
The Scottish Government has effective control over the general operations of the Council – it is responsible for providing
the statutory framework within which the Council operates, provides the majority of its funding in the form of grants and
prescribes the terms of many of the transactions that the Council has with other parties (e.g. Council Tax bills).  Grants
received from government departments are set out in the subjective analysis in Note 14 on expenditure and income
analysed by nature. 
Tayside Valuation Joint Board
The Tayside Valuation Joint Board provides services on behalf of Perth and Kinross, Angus and Dundee Councils.  The
Council does not have any direct control or influence over the board and the amount payable to this body for valuation
services and electoral registration services was £1.712 million (2024/25 £1.762 million).  £1.393 million is disclosed in the
Comprehensive Income and Expenditure Statement under Valuation Joint Board and £319,000 under Chief Executive for
electoral and registration services.
Members
Members of the Council have direct control over the Council’s financial and operating policies.  The total of members’
allowances paid in 2025/26 is shown in the Remuneration Report.  During 2025/26, three councillors had an interest in
businesses from which the Council commissioned works and services to the value of £2,346, £1,438 and £49 respectively. 
Contracts were entered into in full compliance with the Council’s standing orders and the Councillors’ Code of Conduct.
In addition the Council makes revenue and capital payments to a large number of organisations on which Council
members are represented. 
Chief Officers
Chief Officers of the Council have control over the Council’s financial and operating policies.  The total of Chief Officers’
remuneration is shown in the Remuneration Report.  Officers have a responsibility to adhere to a Code of Conduct which
requires them to declare any interests in matters that directly or indirectly influence, or be thought to influence, their
judgement or decisions taken during their work.
During 2024/25 the Chief Executive was appointed as a Trustee and Company Director for Enable Scotland, Enable
Scotland (Leading the Way), Crossroads Caring Scotland and the Mungo Foundation.  During 2025/26 the Council made
payments of £1.170 million with Enable Scotland (2024/25 £1.1 million) and £610,000 with Crossroads (2024/25
£572,000). Contracts were entered into in full compliance with procurement rules.
61 | Perth and Kinross Annual Accounts 2025/26 Page 80 of 314

Page 81

62 | Perth and Kinross Council Annual Accounts 2025/26 
Live Active Leisure Ltd
This organisation provides leisure services within the area served by the Council.  A grant was provided in 2025/26
amounting to £4.963 million (2024/25 £4.894 million).  It is a sole member Company with the Council as that member.
Perth Theatre and Concert Hall Ltd
This organisation operates Perth Concert Hall and Perth Theatre.  A grant was provided in 2025/26 amounting to £1.068
million (2024/25 £1.056 million).  It is a sole member Company with the Council as that member.
Culture Perth and Kinross Ltd
This organisation has operated libraries, museums and arts galleries in Perth and Kinross since 1 April 2016.  A grant was
provided in 2025/26 amounting to £3.965 million (2024/25 £3.919 million).  It is a sole member Company with the Council
as that member.
Tayside Contracts Joint Committee
This organisation provides roads maintenance; catering and cleaning services to the Council.  Payments to Tayside
Contracts in 2025/26 amounted to £37.972 million (2024/25 £39.037 million).  The Joint Committee is administered and
controlled by Dundee City, Angus and Perth and Kinross Councils.
Health and Social Care Partnership
This organisation is a joint venture between Perth and Kinross Council and Tayside Health Board and has since 1 April
2016 provided an integrated Health and Social Care service.  Contributions to the Health and Social Care Partnership in
2025/26 amounted to £105.639 million (2024/25 £92.223 million) and income received from the Partnership for
commissioned services £127.006 million (2024/25 £115.844 million).  The Council has a Creditor of £11,000 due to the
Health and Social Care Partnership as at 31 March 2026 (2024/25 £232,000).
20. Leases
Council as Lessee
The Council has adopted IFRS 16 Leases with effect from 1 April 2024.  Properties and other vehicles, plant and equipment
which fall within scope for IFRS 16 have been captured as right of use assets on the Council’s Balance Sheet.  The following
disclosures relate to low value assets having an individual value of less than £10,000, agreements with less than 12 months
to run, and agreements which fail IFRS 16 tests. 
The Council operates a Lease Car Scheme which is available to eligible employees and lease rental payments are
recovered from employees.  The Council also leases in some fleet vehicles for use in the Council's operations.  All current
leasing agreements for cars and operational vehicles are due to expire during the financial years 2026/27 to 2028/29.
The Council has also acquired the use of a number of properties by entering into leasing arrangements.  The majority of
such properties are used for office accommodation and any capital works undertaken within these premises is written down
over the shorter of the lease term or the useful life of the property.
The future minimum lease payments due under non-cancellable leases in future years are:
2025/26 2024/25
£'000 £'000
Not later than one year 108 182
Later than one year and not later than five years 197 253
Later than five years 33 33
338 468
The expenditure charged to the Services lines in the Comprehensive Income and Expenditure Statement during the year in
relation to these leases was:
2025/26 2024/25
£'000 £'000
Minimum lease payments 115 153
Sublease payments receivable (26) (25)
89 128
62 | Perth and Kinross Annual Accounts 2025/26 Page 81 of 314

Page 82

63 | Perth and Kinross Council Annual Accounts 2025/26 
Council as Lessor
The Council leases out property under operating leases at normal market rents with the following purpose:
Land for the generation of rental income arising from its use; land and buildings, which include offices and shops, for the
supply of suitable business accommodation to promote economic development or satisfy social needs, or to solely generate
rental income for the Council.  
The total future minimum lease payments receivable under non-cancellable leases in future years are:
2025/26 2024/25
£'000 £'000
Not later than one year 1,292 1,348
Later than one year and not later than five years 4,626 4,161
Later than five years 54,868 51,282
60,786 56,791
The minimum lease payments receivable do not include rents that are contingent on events taking place after the lease was
entered into, such as adjustments following rent reviews.  There were no material adjustments in respect of contingent rents
during the years 2024/25 and 2025/26.
Right of Use Assets
As a lessee, the Council has previously classified leases as operating or finance leases based on its assessment of whether
the lease transferred significantly all of the risks and rewards incidental to ownership of the underlying asset to the Council. 
The CIPFA Code mandated the adoption of IFRS 16 Leases from 1 April 2024.  The main impact of the accounting requirement
is that a right of use asset and a corresponding lease liability are now included on the balance sheet.  
The CIPFA Code does include recognition exemptions to short-term leases and low value assets, and the Council has
applied these.  Right of use assets and the lease liabilities for short term leases that have a term of 12 months or less from
the Balance Sheet date, and leases of low value assets, are not recognised on the balance sheet.  The Council recognises
the lease payments associated with these leases as an expense on a straight-line basis over the lease term. 
Right-of-use assets and lease liabilities have been calculated as if IFRS 16 had always applied but are recognised in the
year of adoption and not by adjusting prior year figures. 
The Council has applied PWLB interest rates, at the date of lease inception, to the outstanding lease rentals.  The weighted
average incremental borrowing rate equates to 4.81%. 
IFRS 16 also applies to service concession arrangements i.e. Public Private Partnerships (PPP) and similar schemes, and
the contractual arrangements continue to be disclosed in Note 36.
Right of Use (IFRS 16) liabilities:
2025/26 2024/25
£'000 £'000
Value at 1 April 376 443
Initial Measurement Additions 87 0
Principal repaid in the year (108) (67)
Value at 31 March 355 376
Other land and buildings 301 291
Vehicles, plant and equipment 54 85
355 376
Liability analysed by:
Current 113 69
Non-current 242 307
355 376
Lease liabilities
Within 1 year 113 69
Between 2 and 5 years 79 130
Over 5 years 163 177
Total liabilities 355 376
The Interest expense charged to the Comprehensive Income and Expenditure Statement during 2025/26 is £20,000
(£19,000 in 2024/25), and the expense relating to short term leases is £38,000 (£54,000 in 2024/25). 
63 | Perth and Kinross Annual Accounts 2025/26 Page 82 of 314

Page 83

21. Property, Plant and Equipment
Movements on Fixed Assets 2025/26 in respect of Property, Plant and Equipment are shown below:
Movements in 2025/26 Other Vehicles Assets PFI and DBFM
Council Land and Plant and Community Surplus Under Total Assets
Dwellings Buildings Equipment Assets Assets Construction PPE included in PPE
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Gross Book Value
As at 1 April 2025 306,940 800,626 82,214 28,149 1,677 98,691 1,318,297 221,419
Additions 34,088 37,839 11,729 1,177 0 8,508 93,341 5,235
Revaluation increases recognised in the
Revaluation Reserve 1,941 16,825 0 0 1,063 0 19,829 (2,831)
Revaluation decreases recognised in the
Revaluation Reserve 0 (20,924) 0 0 (225) 0 (21,149) (7,737)
Revaluation increases recognised in the
Surplus / Deficit on the Provision of Services 0 763 0 0 22 0 785 (161)
Revaluation decreases recognised in the
Surplus / Deficit on the Provision of Services 0 (23,521) 0 0 (49) 0 (23,570) (4,867)
Derecognition - Disposals (7,291) (1,982) (18,275) (2,399) (35) (216) (30,198) 0
Asset reclassifications 4,901 94,200 0 879 461 (99,648) 793 (4,016)
Other movements 0 (1) 0 1 1 (1) 0 0
As at 31 March 2026 340,579 903,825 75,668 27,807 2,915 7,334 1,358,128 207,042
Depreciation
As at 1 April 2025 (34) (54,519) (50,615) (17,663) 0 0 (122,831) (14,674)
Depreciation charge for 2025/26 (14,151) (24,426) (10,415) (1,166) 0 0 (50,158) (5,334)
Depreciation written out to the
Revaluation Reserve - Revaluation Gain 6,827 32,337 0 0 0 0 39,164 9,185
Depreciation written out to the
Revaluation Reserve - Revaluation Loss 0 8,908 0 0 0 0 8,908 3,332
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Gain 0 4,139 0 0 0 0 4,139 1,794
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Loss 0 3,456 0 0 0 0 3,456 363
Derecognition - Disposals 7,291 241 18,126 2,399 0 0 28,057 0
Derecognition - Other 0 0 23 0 0 0 23 0
Asset reclassifications 0 0 0 0 0 0 0 0
Other movements 0 1 0 0 0 0 1 (2)
As at 31 March 2026 (67) (29,863) (42,881) (16,430) 0 0 (89,241) (5,336)
Net Book Value at 31 March 2026 340,512 873,962 32,787 11,377 2,915 7,334 1,268,887 201,706
64 | Perth and Kinross Annual Accounts 2025/26 Page 83 of 314

Page 84

The gross book value above includes £17.791 million of fully depreciated assets which may still be in use (2024/25 £29.585 million). A review has resulted in a derecognition policy for
assets that are highly likely to no longer be providing a benefit to the Council, to be disposed of from the fixed asset register. The initial reduction from 2024/25 reflects the implementation
of the policy and continued reductions in the value is anticipated for 2026/27. 
The reporting of book values for Infrastructure Assets is amended following the issue of the Local Government Finance Circular 09/2022.  The Finance Circular outlines historic issues for
the consistent accounting treatment of derecognised infrastructure components and the reporting of book values by local authorities.  A CIPFA task group is progressing a remedy and the
CIPFA Code will be updated in due course.  To satisfy the audit of the 2025/26 accounts, the following statutory overrides are provided in the Circular: -
Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2027 a local authority is not required to report the gross cost and accumulated depreciation for
infrastructure assets.
Statutory Override 2: For accounting periods commencing from 1 April 2010 until 31 March 2027 the carrying amount to be derecognised in respect of a replaced part of an infrastructure
asset is to be taken to be and accounted for as a nil amount.  No subsequent adjustment shall be made to the carrying amount of the asset with respect to that part.
The Council has elected to adopt both statutory overrides.  The Net Book Value above excludes Infrastructure Assets, when these assets are included the NBV is as follows: 
Infrastructure
Assets
£'000
Net Book Value at 1 April 2025 384,536
Additions 49,253
Depreciation (21,305)
Net Book Value at 31 March 2026 412,484
The total for all PPE, when Infrastructure Assets are included, is set out below:
Total PPE
£'000
Total PPE (above) 1,268,887
Net Book Value of Infrastructure Assets 412,484
Total PPE Net Book Value at 31 March 2026 (including Infrastructure Assets) 1,681,371
65 | Perth and Kinross Annual Accounts 2025/26 Page 84 of 314

Page 85

Property, Plant and Equipment cont’d
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Gross Book Value
As at 1 April 2024 319,682 805,561 76,554 26,465 691 36,447 1,265,400 221,776
Additions 29,708 16,159 13,490 1,456 4 54,967 115,784 45
Revaluation increases recognised in the
Revaluation Reserve 0 1,252 0 0 126 0 1,378 0
Revaluation decreases recognised in the
Revaluation Reserve (45,488) (49,933) 0 0 (40) 0 (95,461) (49,399)
Revaluation increases recognised in the
Surplus / Deficit on the Provision of Services 0 940 0 0 211 0 1,151 0
Revaluation decreases recognised in the
Surplus / Deficit on the Provision of Services 0 (13,426) 0 0 (194) 0 (13,620) (6,358)
Derecognition - Disposals (3,249) (508) (7,830) 0 (204) 0 (11,791) 0
Asset reclassifications 6,287 (14,771) 0 228 1,084 7,276 104 0
Other movements 0 55,352 0 0 (1) 1 55,352 55,353
As at 31 March 2025 306,940 800,626 82,214 28,149 1,677 98,691 1,318,297 221,417
Depreciation
As at 1 April 2024 0 (35,595) (48,354) (16,383) 0 0 (100,332) (8,467)
Depreciation charge for 2023/24 (13,188) (21,219) (9,908) (1,240) 0 0 (45,555) (6,207)
Depreciation written out to the
Revaluation Reserve - Revaluation Gain 0 495 0 0 0 0 495 0
Depreciation written out to the
Revaluation Reserve - Revaluation Loss 10,058 12 0 0 0 0 10,070 0
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Gain 0 8 0 0 0 0 8 0
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Loss 0 1,732 0 0 0 0 1,732 0
Derecognition - Dispoals 3,096 8 7,647 0 0 0 10,751 0
Other movements 0 40 0 (40) 0 0 0 0
As at 31 March 2025 (34) (54,519) (50,615) (17,663) 0 0 (122,831) (14,674)
Net Book Value at 31 March 2025 306,906 746,107 31,599 10,486 1,677 98,691 1,195,466 206,743
66 | Perth and Kinross Annual Accounts 2025/26 Page 85 of 314

Page 86

The reporting of book values for Infrastructure Assets is amended following the issue of the Local Government Finance Circular 09/2022.
The Net Book Value above excludes Infrastructure Assets, when these assets are included the NBV is as follows: 
Infrastructure
Assets
£'000
Net Book Value at 1 April 2024 347,765
Additions 56,551
Depreciation (19,780)
Net Book Value at 31 March 2025 384,536
The total for all PPE, when Infrastructure Assets are included, is set out below:
Total PPE
£'000
Total PPE (above) 1,195,466
Net Book Value of Infrastructure Assets 384,536
Total PPE Net Book Value at 31 March 2025 (including Infrastructure Assets) 1,580,002
67 | Perth and Kinross Annual Accounts 2025/26 Page 86 of 314

Page 87

68 | Perth and Kinross Council Annual Accounts 2025/26 
Property, Plant and Equipment cont’d
Capital Commitments
At 31 March 2026, the Council has entered into a number of contracts for the construction or enhancement of Property, Plant
and Equipment in 2025/26 and future years budgeted to cost £41.080 million (31 March 2025 £74.720 million).  The total
commitment is made up of the following:
2025/26 2024/25
£'000 £'000
Education Projects 10,334 22,045
Roads and Bridges Improvement Schemes 7,929 12,634
Flood Protection 16,196 30,823
Fleet Vehicles 285 779
Council Dwellings 1,985 4,546
Other Capital Projects 4,351 3,893
41,080 74,720
Education projects include Perth High School and Blairgowrie Recreation Centre.  Roads and Bridges Improvement
Schemes includes the Bertha Park Link Road.  Flood Protection includes the Comrie Flood Protection Scheme.
Valuation of Assets
Revaluations
The Council carries out a rolling programme that ensures all Property, Plant and Equipment required to be measured at its
current value is revalued by a registered valuer at least every five years.  In the intervening years, the Council applies
indexation to the previous valuations to reflect the potential inflationary change in the carrying value. 
Professional Revaluations
The Council commissioned a potential movement review of the full 2023/24 valuation for Council Dwellings as at 31 March
2026; and an external valuation for a further selection of assets which was performed during the last quarter of financial year
2025/26.  In addition, the Council’s internal valuers performed valuations for a number of assets, including investment
properties, and properties requiring revaluation due to redevelopment or a change of use, during the last quarter of financial
year 2025/26.  In applying the Royal Institution of Chartered Surveyors (RICS) Valuation Global Standards (‘Red Book’), the
valuation reports include an explanatory note which provides an update on market conditions and confirms there is adequate
evidence on which to base an opinion of value.  However, uncertainties do remain and there is the potential for markets to
move rapidly in response to the effects of conflict in Eastern Europe and the Middle East.
The valuation reports have been used to inform the measurement of non-current assets in these financial statements.  The
valuers have continued to exercise professional judgment in preparing the valuations and, therefore, this is the best
information available to the Council as at 31 March 2026 and can be relied upon.
Indexed Revaluations
From 1 April 2025, the Code of Practice on Local Authority Accounting in the United Kingdom (the Code) requirements
changed in respect of revelations of Property, Plant and Equipment.  Where authorities have a rolling programme of
revaluations in place and/or the assets are non-property assets subject to indexation, authorities revalue their assets on a
rolling basis every five years, with annual indexation applied to assets during the four intervening years.  Where authorities
cannot obtain indices without undue cost or effort, authorities revalue those assets using a quinquennial revaluation with a
desktop revaluation in year three.
To meet the requirement, the Council’s internal valuers have researched potential indices and provided a recommendation
for those that should be adopted for the calculation of movements in asset values, in the intervening years within the five-
year cycle of professional valuations.  Indices will be kept under review to ensure they remain relevant for the associated
asset types; if a more appropriate index is identified the Council may elect to adopt this in place of the previously utilised
index.  For 2025/26 the adopted indices are as follows:
- BCIS Reference Rates for assets revalued using the DRC methodology;
- Consumer Price Index for assets revalued using EUV where a Building is in situ, with Land indexed similarly where it
is intrinsically linked to that building (this includes Car Parks);  
- Savills Scotland Greenfield Land Index for assets revalued using EUV, where the asset only comprises Land (this
includes Land based elements of DRC assets).  
68 | Perth and Kinross Annual Accounts 2025/26 Page 87 of 314

Page 88

69 | Perth and Kinross Council Annual Accounts 2025/26 
The movements on indices as set out above for 2025/26 are:
Average Valuation
Change Movement
% £'000
BCIS Reference Rates* 2.5% (15,634)
Consumer Price Index 3.3% 487
Savills Scotland Greenfield Land Index 4.2% 2,605
Total Indexation Applied 2025/26 3.3% (12,542)
*The BCIS movement in the table above is an average of the rates that are applicable to Perth and Kinross Council assets. 
The greatest increase was 15.5% and the greatest reduction was 18.0%.
Professional revaluations are carried out in accordance with RICS Red Book requirements, while indexation reflects market-
based movements applied in intervening period.  Although the valuation approaches differ, both are treated equally for
accounting purposes under the revaluation model.
Note 4 – Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty provides additional
information on revaluations.
Surplus Assets are valued annually on a fair value basis.  In terms of the fair value hierarchy, all Surplus Assets are valued
at Level 2 and there were no transfers between Levels during the year.
The table below sets out the Gross Book Value of asset categories carried at historic cost and current value at 31 March
2026.  This includes assets that have been revalued using indices, introduced for accounting periods commencing from 1
April 2025.
Other
Council Land and Surplus
Dwellings Buildings Assets Total
£'000 £'000 £'000 £'000
Carried at historical cost 0 9,726 0 9,726
Values at current value as at:
31 March 2026 339,583 886,813 2,915 1,229,311
31 March 2025 0 140 0 140
31 March 2024 996 0 0 996
31 March 2023 0 7,146 0 7,146
31 March 2022 0 0 0 0
Total Cost or Valuation 340,579 903,825 2,915 1,247,319
Changes in Estimates
The Council has made no material changes to accounting estimates for Property, Plant and Equipment in 2025/26 or
2024/25.
22. Heritage Assets
Reconciliation of the carrying value of Heritage Assets held by the Council
Art War Other Total
Collection Memorials
£'000 £'000 £'000 £'000
Cost or Valuation
Balance at 1 April 2024 51,740 48 26 51,814
Additions 285 0 0 285
Balance at 31 March 2025 52,025 48 26 52,099
Cost or Valuation
Balance at 1 April 2025 52,025 48 26 52,099
Additions 0 0 0 0
Balance at 31 March 2026 52,025 48 26 52,099
Art Collection
The collection of Fine Art maintained and preserved by Culture Perth and Kinross, on behalf of Perth and Kinross Council, is
varied and includes oil paintings (approximately 1,225 items), watercolours (900), drawings (4,000), prints (1,500) and
69 | Perth and Kinross Annual Accounts 2025/26 Page 88 of 314

Page 89

70 | Perth and Kinross Council Annual Accounts 2025/26 
sculptures (150).  The Fine Art collection also includes J D Fergusson and Margaret Morris archives which number
approximately 30,000 items and include a number of significant works. 
The Art Collection also includes silver, glass, ceramics, furniture, Oriental materials, horology, metalwork and jewellery;
these are collectively identified as Applied Art.
Curators within Culture Perth and Kinross continually monitor the sales values of works by artists within the collection and
will revalue similar items if there is evidence of a movement in value. 
A significant pearl jewellery collection was recognised as donated to Heritage Assets in 2024/25.  There were no significant
additions in 2025/26. 
Additions and Disposals of Heritage Assets
There has been no significant addition, other than the pearl jewellery collection, either by purchase or donation, to the Fine
and Applied Art collection during the current or previous five financial years.  The majority of the collections are held in
perpetuity, or have disposal conditions attached, and consequently no Fine and Applied Art disposals have occurred during
the current and previous five financial years.
Fine and Applied Art
The Fine Art collection owes its existence largely to the 1,926 bequests of local patrons Robert Hay Robertson and Robert
Brough, although the first painting entered the collection as early as 1785.
The collection is international in its scope and numbers over 4,000 items.  It includes an interesting group of Italian ‘Old
Masters’, a small but important group of 19th Century French works, a good group of 17th century Dutch and Flemish
paintings and work by English artists including a small but highly important collection of natural history watercolours by
Beatrix Potter.
Its greatest strength however lies in its holding of Scottish pictures.  These span the 16th to the 21st century and include
such important works as Loch Katrine by Horatio McCulloch and D Y Cameron’s The Wilds of Assynt, as well as pictures
with strong local connections.  Amongst these are pictures by local artists, local topographical views and portraits of local
individuals.  The collection seeks to retain a balance between the historical and the contemporary aspects whilst continuing
to develop the holdings of works of specifically local interest.
In 1991 the collection was effectively doubled in size with the gifting of the J D Fergusson Art Foundation’s collection of
artworks by the Scottish ‘Colourist’ John Duncan Fergusson (1874-1961) and its associated archive. 
The Applied Art collection has been acquired since 1785 through purchase, gift or bequest.  It covers a wide variety of
objects and materials, within which the collections of Perth silver and Perthshire glass are unsurpassed in terms of national
importance.  The ceramics collection contains significant collections of Staffordshire flat-back figures and Martinware studio
pottery as well as a collection of studio pottery produced by potter’s native to or resident in the Perth and Kinross area. 
Other smaller collections include furniture, timepieces, Oriental and other items.
The promotion of other cultural events and programmes during the year makes it difficult to reliably estimate the percentage
of the Art Collection on display for public viewing.  However, all items are held in secure storage and access is permitted to
scholars and others for research purposes.
The museum collection also includes History and Natural History collections for which an amount of insurance cover has
been obtained.  These objects and collections, in most instances, are rare and irreplaceable and there is insufficient
evidence on which to place a reliable estimate of value.  There are in excess of 289,000 items within the History and Natural
History collections and the cost of obtaining valuations would be disproportionate in terms of any benefit derived to the user
of the financial statements.  On this basis, the History and Natural History collections are, therefore, excluded from the
carrying value of Heritage Assets held by the Council.
The Culture Perth and Kinross Limited Collections Management Framework provides guidance on the collection, disposal or
lending of heritage assets.
23. Investment Properties
2025/26 2024/25
£'000 £'000
Rental income from investment property (954) (939)
Direct operating expenses arising from investment property 48 50
Balance at end of year (906) (889)
70 | Perth and Kinross Annual Accounts 2025/26 Page 89 of 314

Page 90

71 | Perth and Kinross Council Annual Accounts 2025/26 
The following table summarises the movement in the fair value of investment properties over the year:
2025/26 2024/25
£'000 £'000
Balance at start of year 16,184 14,715
Additions - Purchases 0 150
Net gain / (loss) from fair value adjustments 1,433 1,480
Transfer to Property, Plant and Equipment (588) (161)
Balance at end of year 17,029 16,184
All of the Authority's investment properties are valued at Level 2 on the fair value hierarchy.  Values as at 31 March 2026 and
31 March 2025 are as follows:
2025/26 2024/25
£'000 £'000
Recurring fair value measurements using:
Industrial and Commercial Land 15,484 14,658
Shops and Offices 1,000 971
Other Investment Properties 545 555
Total Fair Value 17,029 16,184
Valuation Techniques used to Determine Level 2 Fair Values for Investment Properties
Significant Observable Inputs – Level 2
The majority of the value of Industrial and Commercial Land relates to sites leased out on ground leases.  Market data is
available at national and local levels from sector specialists to provide the valuers with information, such as trends and rent
yields, for the commercial and industrial markets.  Local market activity for ground leases tends to follow national trends and
valuations are undertaken using a discounted income approach.  Ground leases are longer term arrangements and sites of
this nature enjoy 100% occupancy levels; the rental income stream is known and market data for rent yields is available, all
of which are observable input.  As a result of the conditions of the ground lease agreement, there is no unobservable input. 
The valuation of investment land leased out on a ground lease therefore requires the use of observable market data and
minimal, if any, unobservable data and is regarded as Level 2.
Market data providing information on trends and rent yield is available from sector specialists for leased Shops and Offices. 
Local market data is used to assist the valuation process, and valuations are undertaken using the income approach,
discounted using market rates to arrive at a net present value for the income stream.  The valuer will also consider other
factors, such as the age and condition of the property, when arriving at the final valuation.  This requires judgement;
however, any unobservable input is not considered to be significant in terms of any adjustment to the fair value of the
property.  The valuation of the shops and offices is mainly representative of the available market data, and the valuation
input is primarily based on observable data.  Therefore, the properties are categorised as Level 2. 
Other Investment Properties primarily relate to land held for development by the private sector, which will generate a receipt
to the Council on disposal.  Sites held for redevelopment are valued on the basis of the highest and best use of the site,
taking into account adjacent and surrounding property, recent market activity, and development plan restrictions.  The
valuation of these sites is therefore based upon observable input, i.e. local market data, and as such will be regarded as
Level 2.
Highest and Best Use of Investment Properties
In estimating the fair value of the authority’s investment properties, the highest and best use of the properties is their current
use.
Valuation Techniques
There has been no change in the valuation techniques used during the year for investment properties.
Valuation Process for Investment Properties
The fair value of the Council’s investment property is measured annually at each reporting date.  The majority of valuations
are carried out internally, in accordance with the methodologies and bases for estimation set out in the professional
standards of the Royal Institution of Chartered Surveyors.  The Council’s valuation experts work closely with finance officers
reporting directly to the Chief Finance Officer on a regular basis regarding all valuation matters.
The valuation reports have been used to inform the measurement of Investment properties in these financial statements. 
The valuers have continued to exercise professional judgement in preparing the valuation and, therefore, this is the best
information available to Council as at 31 March 2026 and can be relied upon.  
71 | Perth and Kinross Annual Accounts 2025/26 Page 90 of 314

Page 91

72 | Perth and Kinross Council Annual Accounts 2025/26 
24. Intangible Assets
The movement on Intangible Asset balances during the year is as follows:
2025/26 2024/25
Assets Assets
£'000 £'000
Balance at start of year
Gross carrying amount 5,151 4,292
Accumulated amortisation (2,962) (3,944)
Net carrying amount at start of year 2,189 348
Additions: Purchases 240 3,073
Other disposals:
Gross Carrying Amount (1,380) (2,214)
Accumulated amortisation 1,358 2,214
Amortisation for the period (1,191) (1,232)
Net carrying amount at end of year 1,216 2,189
Comprising:
Gross carrying amounts 4,011 5,151
Accumulated amortisation (2,795) (2,962)
1,216 2,189
Intangible Assets include the cost of software licences and bespoke software solutions deemed to provide future benefit to
the Council.  These items have been included and amortised over their perceived useful life. 
25. Assets Held for Sale
2025/26 2024/25
£'000 £'000
Balance outstanding at start of year 875 676
Assets newly classified as held for sale 0 205
Revaluation gains 60 142
Assets declassified as held for sale (205) (148)
Assets sold (165) 0
Balance outstanding at year end 565 875
Current
26. Long Term Debtors
2025/26 2024/25
£'000 £'000
Other Entities and Individuals 357 530
Total 357 530
27. Inventories
2025/26 2024/25
£'000 £'000
Balance outstanding at start of year 620 632
Purchases 3,715 3,621
Recognised as an expense in the year (3,741) (3,604)
Written off balances (4) (32)
Reversal of write-offs previous years 3 3
Balance outstanding at end of year 593 620
Consumables and
Maintenance Materials
72 | Perth and Kinross Annual Accounts 2025/26 Page 91 of 314

Page 92

73 | Perth and Kinross Council Annual Accounts 2025/26 
28. Debtors
2025/25 2025/26 2024/25 2024/25
£'000 £'000 £'000 £'000
Gross Net Gross Net
Scottish Government 15,341 12,969
Central Government 8,064 10,418
Other Local Authorities 387 184
NHS Bodies 1,088 704
Public Corporations 53 6
Other Entities and Individuals:
Housing Rent 4,008 3,471
less: Impairment (2,126) (1,923)
1,882 1,548
Statutory Additions 7,003 6,649
less: Impairment (7,003) (6,649)
0 0
Other 9,194 10,497
less: Impairment (1,669) (1,915)
7,525 8,582
Trade 12,168 12,467
less: Impairment (3,217) (1,488)
8,951 10,979
Council Tax 22,698 22,812
less: Impairment (18,018) (18,195)
4,680 4,617
Total 47,971 50,007
29. Creditors
2025/26 2025/26 2024/25 2024/25
£'000 £'000 £'000 £'000
Gross Net Gross Net
Scottish Government (914) (446)
Central Government (8,509) (8,005)
Other Local Authorities (333) (1,292)
NHS Bodies (139) (241)
Public Corporations and Trading Funds 0 0
Other Entities and Individuals:
Current Right of Use Liabiltiy (6,244) (9,129)
Employee Statutory Adjustment Account (9,645) (9,372)
Prepaid Council Tax (2,169) (2,712)
Other (29,215) (28,734)
(47,273) (49,947)
Trade Creditors (26,895) (35,569)
Total (84,063) (95,500)
30. Provisions Other than Bad and Doubtful Debts
Self-Insured/Uninsured Losses
The Insurance Fund makes provision for losses arising from Property, Employers’ Liability, Public Liability, Motor, Fidelity
Guarantee, Computer, Engineering and Travel/Personal Accident claims.
The provision provides for an estimate of all liabilities likely to be incurred by the Council in respect of self-insured and
uninsured losses in respect of incidents that have arisen prior to 1 April 2026.
Payments to 3rd parties
The Council has made provision for a number of potential compensation claims arising from significant capital projects within
the Council’s capital programme.
73 | Perth and Kinross Annual Accounts 2025/26 Page 92 of 314

Page 93

74 | Perth and Kinross Council Annual Accounts 2025/26 
Commercial Rent
The Council manages the rental leases for a number of commercial properties.  The Council had previously made provision
for rent refunds due to the downturn in the economic climate affecting retail trading performance which are no longer
required.
Contractor disputes/legal cases
The Council manages disputes and legal claims.  Provision has been made for an ongoing legal appeal which may result in
additional costs to the Council. 
Self Insured/ Payments Commercial Contractor Total
Uninsured to 3rd parties Rent disputes/
Losses legal cases
£'000 £'000 £'000 £'000 £'000
Balance as at 1 April 2025 2,014 2,577 40 134 4,765
Additional provisions made in 2025/26 935 954 0 1,000 2,889
Amounts used in 2025/26 (1,097) (763) (134) (1,994)
Unused amounts reversed in 2025/26 0 (565) (40) 0 (605)
Balance as at 31 March 2026 1,852 2,203 0 1,000 5,055
Balance Sheet Disclosure:
Less than 12 months 391 0 0 1,000 1,391
Over 12 months 1,461 2,203 0 0 3,664
1,852 2,203 0 1,000 5,055
31. Usable Reserves
Movements in the Council’s Usable Reserves are detailed in the Movement in Reserves Statement and notes 5 and 6.
32. Unusable Reserves
2025/26 2024/25
£'000 £'000
Revaluation Reserve (377,955) (336,851)
Capital Adjustments Account (286,189) (325,847)
Financial Instruments Adjustment Account 15,109 15,732
Pensions Reserve 17,753 18,533
Employee Statutory Adjustment Account 9,645 9,372
Total Unusable Reserves (621,637) (619,061)
Revaluation Reserve
The Revaluation Reserve contains the gains made by the Council arising from increases in the value of its Property, Plant
and Equipment.  The balance is reduced when assets with accumulated gains are:  
- re-valued downwards or impaired and the gains are lost;  
- used in the provision of services and the gains are consumed through depreciation; or
- disposed of and the gains are realised.  
The Reserve contains only revaluation gains accumulated since 1 April 2007, the date that the Reserve was created. 
Accumulated gains arising before that date are consolidated into the balance on the Capital Adjustment Account.
74 | Perth and Kinross Annual Accounts 2025/26 Page 93 of 314

Page 94

75 | Perth and Kinross Council Annual Accounts 2025/26 
2025/26 2024/25
£'000 £'000
Balance at 1 April (336,851) (425,931)
Upward revaluation of assets (58,993) (1,873)
Downward revaluation of assets and impairment losses not charged to the (Surplus)/
Deficit on the Provision of Services 12,241 85,391
Sub-Total (383,603) (342,413)
Difference between fair value depreciation and historical cost depreciation 4,385 5,411
Accumulated gains on assets sold or scrapped written out to the Capital
Adjustment Account 1,263 151
Balance at 31 March (377,955) (336,851)
Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements for accounting for the
consumption of non-current assets and for financing the acquisition, construction or enhancement of those assets under
statutory provisions.  The Account is debited with the cost of acquisition, construction or enhancement as depreciation,
impairment losses and amortisations are charged to the Comprehensive Income and Expenditure Statement.  The Account
is credited with the amounts set aside by the Council as finance for the costs of acquisition, construction and enhancement.
The Account contains accumulated gains and losses on Investment Properties and gains recognised on donated assets that
have yet to be consumed by the Council.
The Account also contains revaluation gains accumulated on Property, Plant and Equipment before 1 April 2007, the date
that the Revaluation Reserve was created to hold such gains.
Note 5 provides details of the source of all the transactions posted to the Account, apart from those involving the Revaluation
Reserve.
2025/26 2024/25
£'000 £'000
Balance at 1 April (325,847) (338,099)
Reversal of items relating to capital expenditure debited or credited to the Comprehensive
Income and Expenditure Statement
Charges for depreciation and impairment of non current assets 67,079 59,923
Revaluation (gains)/losses on Property, Plant and Equipment 15,130 10,587
Amortisation of intangible assets 1,191 1,232
Revenue expenditure funded from capital under statute 202 2,619
Amounts of non current assets written off on disposal as part of the gain/loss 2,306 1,040
(239,939) (262,698)
Adjusting amounts written out of the Revaluation Reserve (1,263) (151)
(241,202) (262,849)
Capital financing applied in the year:
Use of the Capital Receipts Reserve to finance new capital expenditure (404) (1,672)
Donated assets (80) (285)
Capital grants and contributions credited to the Comprehensive Income and Expenditure
Statement (24,198) (42,079)
Application of grants to capital financing from the Capital Grants Unapplied Account 215 1,060
Statutory provision for the financing of capital investment charged against the General Fund
and HRA balances (17,707) (16,387)
Statutory adjustment for Financial Flexibilities applied to Service Concession Arrangements
(see note 36) 2,746 2,914
Capital expenditure charged against the general fund and HRA balances (4,017) (5,136)
(284,647) (324,434)
Movements in the fair value of the Investment Properties (1,433) (1,480)
Movements in value of finance leases (109) 67
Balance at 31 March (286,189) (325,847)
75 | Perth and Kinross Annual Accounts 2025/26 Page 94 of 314

Page 95

76 | Perth and Kinross Council Annual Accounts 2025/26 
Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account (FIAA) is used to hold the losses or gains arising on the early redemption of
loans per statutory provisions, as well as the historic timing differences arising from the different arrangements for
accounting for income and expenses relating to certain financial instruments.  These statutory provisions allow for annual
charges to be made in accordance with the original amortisation schedules which existed at the time the provisions were
introduced.  
The Council uses the Account to manage the balance of premiums and discounts which existed at 31 March 2007 which
arose on the early redemption of loans.  Any premiums or discounts incurred or received after this date may also be held in
this Account.  These are subsequently charged to the General Fund and Housing Revenue Account (HRA) in accordance
with statutory provisions and so spreading the burden on Council Tax and Housing Rents.  
The Council also uses the FIAA to hold the difference in interest charges which arose on stepped interest rate loans.  These
had low interest rates in the early years before “stepping up” to a higher interest rate.  Interest on such loans is now required
to be charged consistently over the life of the loan using the Effective Interest Rate Method.  The difference in the cumulative
charges to 31 March 2007 under this new method was debited to the FIAA and will be charged to the General Fund and the
HRA over the life of the loans under the statutory provisions.
Accordingly, the balance on the FIAA as at 31 March 2026 in respect of the above provisions will be charged to the General
Fund and HRA over the next 42 years.  The movements on the FIAA during the year are shown below:
2025/26 2024/25
£'000 £'000
Balance at 1 April 15,732 16,358
Proportion of discounts incurred in previous financial years credited against the General
Fund and HRA Balance in accordance with statutory requirements in the year 4 4
Proportion of premiums incurred in previous financial years charged against the General
Fund and HRA Balance in accordance with statutory requirements in the year (495) (608)
Difference on restatement of Stepped Interest Rate Loans charged against the General
Fund and HRA Balance in accordance with statutory requirements in the year (21) (22)
Adjustment on the extinguishment of stepped interest rate loans charged against the
General Fund and HRA Balance in accordance with statutory requirements in the year (111) 0
Balance at 31 March 15,109 15,732
Pensions Reserve
The Pensions Reserve absorbs the timing differences arising from the different arrangements for accounting for post-
employment benefits and for funding benefits in accordance with statutory provisions.  The Council accounts for post-
employment benefits in the Comprehensive Income and Expenditure Statement as the benefits are earned by employees
accruing years of service, updating the liabilities recognised to reflect inflation, changing assumptions and investment
returns on any resources set aside to meet the costs.  However, statutory arrangements require benefits earned to be
financed as the Council makes employer’s contributions to pensions funds or eventually pays any pensions for which it is
directly responsible.  The debit balance on the Pensions Reserve therefore shows a substantial shortfall between the
benefits earned by past and current employees and the resources the Council has set aside to meet them.  
2025/26 2024/25
£'000 £'000
Balance at 1 April 18,533 20,748
Actuarial Loss on Pensions Assets and Liabilities 3,706 341
Reversal of Items Relating to Retirement Benefits Debited or Credited to the Surplus or
Deficit on the Provision of Services in the Comprehensive Income and Expenditure
Statement 18,937 20,738
Employer's Pensions Contributions and Direct Payments to Pensioners Payable in the
Year (23,423) (23,294)
Balance at 31 March 17,753 18,533
76 | Perth and Kinross Annual Accounts 2025/26 Page 95 of 314

Page 96

77 | Perth and Kinross Council Annual Accounts 2025/26 
Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on the General Fund
Balance from accruing for compensated absences earned but not taken in the year. e.g. annual leave entitlement carried
forward at 31 March.  Statutory arrangements require that the impact on the General Fund Balance is neutralised by
transfers to or from the Account.
2025/26 2024/25
£'000 £'000
Balance at 1 April 9,372 8,186
Cancellation of accrual made at the end of the preceding year (9,372) (8,186)
Amounts accrued at the end of the current year 9,645 9,372
Balance at 31 March 9,645 9,372
33. Impairment Losses
Movements in the value of properties during the year were mainly due to the revaluation of Council Dwellings and the
revaluation, including indexation, of various other individual operational buildings such as Schools (including IIL Community
Campuses), Offices, Depots, Industrial Units and Shops.  Investment properties were also revalued during 2025/26.  One
impairment loss of £216,463 is recognised in 2025/26 because of changes to an HRA New Build scheme at Balhousie.  The
value impaired has been calculated as an apportionment of the addition recognised in 2024/25 that is no longer included in
the updated plans for this site.  All other losses arising have been assessed as a revaluation loss rather than a loss
attributed to deterioration in the anticipated level of the performance of the properties.
34. Grants
The Council credited the following grants, contributions and donations to the Comprehensive Income and Expenditure
Statement in 2025/26.
2025/26 2024/25
£'000 £'000
Credited to Taxation and Non Specific Grant Income
Scottish Government - General Capital Grant 12,438 27,564
Scottish Government - Council Dwellings 7,941 9,615
Scottish Government - Specific Capital Grant 1,601 480
Developer Contributions 824 2,401
Other Third Party Contributions 1,179 2,019
23,983 42,079
Credited to Services
Scottish Government - Bertha Park 2,529 2,525
Scottish Government - Riverside Primary 2,088 681
Scottish Government - Bail Supervision 3,062 791
Scottish Government - Pupil Equity Funding 1,864 1,864
Scottish Government - Scottish Attainment 997 748
Scottish Government - Community Led Local Development 739 691
Scottish Government - No One Left Behind 2,037 1,826
Scottish Government - Criminal Justice 1,922 1,834
Scottish Government - Other 7,449 5,371
Scottish Government Directorates & Bodies 241 245
Sport Scotland 405 423
Ukraine funding 357 1,087
Department for Levelling Up, Housing and Communities - Shared Prosperity 1,877 2,664
Other Third Party Contributions 3,877 820
29,444 21,570
77 | Perth and Kinross Annual Accounts 2025/26 Page 96 of 314

Page 97

78 | Perth and Kinross Council Annual Accounts 2025/26 
The Council has received a number of grants, contributions and donations that have yet to be recognised as income as they
have conditions attached to them that will require the monies or property to be returned.  The balance at the year-end is as
follows:
2025/26 2024/25
£'000 £'000
Revenue Grants  - Received in Advance
Scottish Government 779 619
Other grants and contributions 340 493
Balance at 31 March 1,119 1,112
35. Capital Expenditure and Capital Financing
The total amount of capital expenditure incurred in the year is shown in the table below (including the value of assets
acquired under PFI/PPP/DBFM contracts), together with the resources that have been used to finance it.  Where capital
expenditure is to be financed in future years by charges to revenue as assets are used by the Council, the expenditure
results in an increase in the Capital Financing Requirement (CFR), a measure of the capital expenditure incurred historically
by the Council that has yet to be financed.  The CFR is analysed below.
2025/26 2024/25
£'000 £'000
Capital Financing Requirements b/fwd 932,783 816,351
Capital Expenditure
Property, Plant and Equipment 137,287 173,884
Intangible Assets 240 3,073
Revenue Expenditure funded from Capital 202 775
137,729 177,732
1,070,512 994,083
Sources of Finance
Capital Receipts (403) (1,672)
Government Grants and Contributions (23,983) (41,019)
Revenue Contributions (4,017) (5,135)
Service concession flexibility 2,746 2,914
Loans Fund Principal Repayments (17,702) (16,388)
(43,359) (61,300)
Closing Capital Financing Requirement c/fwd 1,027,153 932,783
Movement 94,370 116,432
Analysed as:
Increase in need to borrow 99,406 122,375
Net assets acquired under PPP contract (5,036) (5,943)
94,370 116,432
36. Public Finance Initiatives and Similar Contracts
The Council has an obligation for 25 years commencing September 2000 in respect of a unitary charge payment to be made
for office accommodation and a car park.
The unitary charge for 2025/26 for the office accommodation was £1.257 million until September 2025 (2024/25 £2.657
million).  
The unitary charge for 2025/26 for the car park was £186,000 (2024/25 £408,000).
The contract payments ended in September 2025 and the Council purchased both Pullar House office accommodation and
the car park at that point.
The project agreement for provision of the facilities included the transfer of four Council properties to the operator in
exchange for reduced annual payments over the life of the agreement.  At the end of this project these assets did not revert
back to the Council.  
The Council has an obligation for six school campuses in a Public Private Partnership with Axiom Education (Perth and
Kinross) Ltd.  North Inch Primary was brought into operation in 2011/12.  Breadalbane Campus at Aberfeldy was completed
78 | Perth and Kinross Annual Accounts 2025/26 Page 97 of 314

Page 98

79 | Perth and Kinross Council Annual Accounts 2025/26 
in 2010/11 and the campuses at Blairgowrie, Perth South, Kinross, Crieff and the Roman Catholic School Campus were
brought into operation during 2009/10.  The Council will make unitary charge payments until the contract ends in 2042, at
which time the campuses will be handed back to the Council at no cost.  The estimated capital value of the scheme is
£127.687 million.
The unitary charge for 2025/26 for the campuses operating in the year was £23.612 million (2024/25 £22.404 million).
Future agreed payments will increase in line with inflation.  The unitary charge payments for 2026/27 for all school
campuses will be £24.475 million.  
During 2019/20 the Council incurred an obligation for Bertha Park High School with the asset and liability recognised in the
Annual Accounts.  The unitary charge for 2025/26 was £3.351 million (2024/25 £3.311 million).
Future agreed payments will increase in line with inflation.  The unitary charge for 2026/27 for Bertha Park will be £3.369
million.
With effect from 1 April 2024, IFRS 16 Leases applies to service concession arrangements.  IFRS 16 requires the lease
liability to be remeasured whenever there is a change in indexation, or other changes in a rate, which impacts upon future
unitary charge payments.  Under IAS17 Leases, the additional cost relating to the financing of the asset was expensed as
Contingent Rent.  Under IFRS 16, the net present value of future payments that comprise the liability is recalculated based
on the revised level of payments.  This has resulted in an increase in Balance Sheet assets of £5.142 million in 2025/26
(opening adjustment £54.476 million in 2024/25 with £876,000 in respect of the annual recalculation) this is subsequently
reduced through the revaluation process.  The increase in the Balance Sheet assets is met with a corresponding increase in
the Balance Sheet liabilities.
Movements in Fixed Assets under Public Private Partnerships during the year were:
2025/26 2024/25
£'000 £'000
Net Book Value at 1 April 206,743 213,309
IFRS16 Transition Restatement 0 54,476
IFRS16 Annual Revaluation 5,142 876
Additions 5,235 795
Reclassification (4,016) 0
Revaluations (20,738) (56,506)
Depreciation (5,334) (6,207)
Depreciation write back 14,674 0
Net Book Value at 31 March 201,706 206,743
Movements in Public Private Partnership Liabilities during the year were:
2025/26 2024/25
£'000 £'000
Liabilities at 1 April 161,535 115,040
IFRS16 Transition Restatement 0 54,476
IFRS16 Annual Revaluation 5,142 876
Amounts repaid in year (7,782) (8,857)
Liabilities at 31 March 158,895 161,535
Disclosed in the Balance Sheet as:
Long Term Liabilities 152,694 153,960
Creditors 6,201 7,575
Liabilities at 31 March 158,895 161,535
79 | Perth and Kinross Annual Accounts 2025/26 Page 98 of 314

Page 99

80 | Perth and Kinross Council Annual Accounts 2025/26 
Future Public Private Partnership liabilities due to be met:
Repayment Interest Service Lifecycle TOTAL
of Liability Charges Maintenance
£'000 £'000 £'000 £'000 £'000
Due within one year 6,201 7,367 8,672 4,883 27,123
Due in 2 to 5 years 28,766 26,427 37,058 19,543 111,794
Due in 6 to 10 years 49,180 24,460 52,159 20,807 146,606
Due in 11 to 5 years 61,218 11,834 59,504 23,207 155,763
Due in 16 to 20 years 13,530 1,096 8,442 3,297 26,365
Total 158,895 71,184 165,835 71,737 467,651
These figures are based on the actual cash amount estimated to be payable and not on prices at 31 March 2026.  The
estimates for Service Charges and Lifecycle Maintenance include an assumed 2.5% inflationary uplift in future years.  The
future inflationary uplift is not applied to the estimates for the Repayment of Liability and Interest costs.  IFRS 16 requires
that these reflect only the actual RPI movement to date.
In September 2022, the Scottish Government issued statutory guidance (Local Government Finance Circular 10-2022)
which allowed Councils temporary flexibility in accounting for Service Concession Arrangements entered into prior to April
2022.  The guidance sets out the accounting requirements and options for recognising the capital repayment element of
these arrangements and permits Councils to undertake internal accounting changes to reprofile the repayment charged to
General Fund over an extended period of time.
The Service Concession Arrangements for which the revised accounting treatment has been adopted include the Council's
PPP arrangement for the six school campuses, and the Design, Build, Finance, Maintain (DBFM) scheme for the Bertha
Park Secondary School.  The Council has applied the permitted flexibility in financial year 2023/24 on a retrospective annuity
basis over 50 years.  This approach is consistent with current Council Loans Fund policy and is considered prudent,
sustainable, and affordable over the useful life of the asset.  The 50 year annuity period replicates the useful asset life of
other similar type assets held on the Council’s balance sheet i.e. schools. 
The current unitary charge repayments to contractors will continue until the end of the PPP and DBFM contracts, however,
the use of this flexibility results in a one-off credit to the General Fund and ongoing annual savings for a period of time.  At
the end of the PPP and DBFM contracts, the unitary charge is no longer paid but reprofiled debt repayments continue to be
charged to the General Fund until the debt liability has been extinguished.  The calculation of the repayment charges, using
the asset life annuity basis, is compared to the current charges which are made over the contract period.  By applying the
flexibility, savings pre 2025/26 are £37.175 million (as detailed in the table below).
Comparison of current and
revised debt repayments
Current
Repayment
Revised
Repayment
(Reduction) /
Cost 
£’000 £’000 £’000
Pre 2025/26 53,069  15,894  (37,175)
Paid in 2025/26 4,320  1,574  (2,746)
Payable in 2026/27 3,943  1,647  (2,296)
Payable within 2 to 5 years 18,143  7,378  (10,765)
Payable within 6 to 10 years 31,033  11,299  (19,734)
Payable within 11 to 15 years 39,070  14,150  (24,920)
Payable within 16 to 20 years 11,156  17,726  6,570
Payable within 21 to 25 years 0 22,212  22,212
Payable within 26 to 30 years 0 27,842  27,842
Payable within 31 to 35 years 0 27,996  27,996
Payable within 36 to 40 years 0 7,259  7,259
Payable within 41 to 45 years 0 5,757  5,757 
160,734  160,734  0 
In addition, an in-year saving occurs in scheduled debt repayments in 2025/26 of £2.746 million (2024/25 £2.914 million). 
This will be followed by a reduction in the annual charges for a further 17 years and then the statutory charges will continue
until the end of the reprofiled debt repayment period.  Over the full asset lives the total repayment for the debt liability
remains the same. 
80 | Perth and Kinross Annual Accounts 2025/26 Page 99 of 314

Page 100

81 | Perth and Kinross Council Annual Accounts 2025/26 
The statutory adjustment for 2025/26 has the following impact on the 2025/26 Balance sheet (Capital Adjustment Account)
and Movement in Reserves statement:
Impact on Balance Sheet and
Movement in Reserves Statement 2025/26 2024/25  
£’000 £’000 
Capital Adjustment Account 2,746  2,914  
Movement in Reserves Statement (2,746)  (2,914)   
37. Authorisation of Annual Accounts
The unaudited Annual Accounts were authorised for issue by the Chief Finance Officer on 29 June 2026.  Events taking
place after this date are not reflected in the financial statements or notes.  Where events taking place before this date
provided information about conditions existing at 31 March 2026, the figures in the financial statements and notes have been
adjusted in all material respects to reflect the impact of this information.
38. Contingent Liabilities
The Council has made provision for insurance claims where appropriate and has an Insurance Fund to manage insurable
risks.  There is also a contingent liability in respect of potential insurance claims incurred but not reported which cannot be
forecast with any certainty. 
There is a contingent liability relating to Municipal Mutual Insurance (MMI), who were the insurers for Tayside Regional
Council (TRC).  Following a Supreme Court judgement in November 2012 a scheme of arrangement has been put in place
where MMI will seek to recover, from the scheme members or successors, 25% (and increase from 15% applied after April
2016) of all claims paid out since 1993 on policies taken out by TRC (less an overall total reduction of £50,000).  Perth and
Kinross Council is one of the successor bodies of TRC.
The remaining assets of the TRC Insurance Fund will not be sufficient to meet all future liabilities due to the long-time
horizon for certain types of claims.
The Limitation (Childhood Abuse) (Scotland) Act 2017 came into force on 4 October 2017 and removed the time limit on
raising civil court actions relating to childhood abuse.  The Council continues to receive claims; these claims continue to be
assessed.  In addition, it is not possible to estimate the potential financial effect in respect of future claims the Council may
receive due to a number of uncertainties.  This includes the number of claims which may arise and the extent of
compensation which could arise.  Additionally, the extent of re-imbursement which might arise from historic or current
insurance policies cannot currently be assessed.  The Council may also receive claims in respect of educational provision.
Previous land tribunal and adjudication claims are now settled.
The Council operates services from a number of properties as a tenant.  In the future there may be a liability in respect of
property costs to reinstate buildings to their original specification and design.
The Council has a potential liability in respect of financial guarantees for the Tayside Pension Fund in respect of Scheduled
Bodies and Admitted Bodies should they cease to exist, withdraw from the Pension Scheme or otherwise become unable to
continue covering any unfunded liabilities.  These bodies include Tayside and Central Scotland Transport Partnership, Live
Active Leisure Ltd, Perth Theatre and Concert Hall Limited, Perth and Kinross Countryside Trust, Perth and Kinross Society
for the Blind, Perth Citizens’ Advice Bureau and Culture Perth and Kinross.  In addition, the Council has a potential liability in
respect of pensions for the Convention of Scottish Local Authorities (COSLA) should the organisation cease to exist.
The Council may have a pay liability pertaining to changes in legislation which could impact on calculation of pay.
Following the issue of the Reinforced Autoclaved Aerated Concrete (RAAC) safety alert in 2019, the Council previously
carried out a review of existing building condition information which was followed up with non-invasive visual inspections
where required.  A subsequent inspection identified two sites with RAAC, one of which has been remediated.  A RAAC
Management Plan is in place for the remaining site and regular inspections are undertaken to monitor the condition of RAAC
for any signs of deterioration.  No significant changes have been recorded to date.  The Council has a robust Building
Condition Survey programme in place which comprises a 5-year rolling survey programme and also includes an annual
review of survey data to monitor any changes in asset condition.  
81 | Perth and Kinross Annual Accounts 2025/26 Page 100 of 314

Page 101

82 | Perth and Kinross Council Annual Accounts 2025/26 
39. Financial Instruments
Accounting regulations require the ‘financial instruments’ (investment, lending and borrowing) of the Council shown on the
balance sheet to be further analysed into various defined categories.  The investments, lending and borrowing disclosed in
the balance sheet are made up of the following categories of ‘financial instruments’. 
31 March 31 March 31 March 31 March 31 March 31 March
2026 2025 2026 2025 2026 2025
£'000 £'000 £'000 £'000 £'000 £'000
Financial Liabilities at amortised cost
Public works Loan Board
(PWLB) 645,695 619,500 112,000 35,697 757,695 655,197
Market Loans 54,176 64,308 515 515 54,691 64,823
Short Term Borrowing 0 0 21,410 4,369 21,410 4,369
Creditors 0 0 52,878 61,852 52,878 61,852
Total borrowings 699,871 683,808 186,803 102,433 886,674 786,241
Financial Assets at amortised cost
Cash and Cash Equivalents 0 0 17,559 24,645 17,559 24,645
Investment Deposits 0 0 5,014 0 5,014 0
Mortgages / Loans to Others 357 530 253 185 610 715
Debtors 0 0 7,941 8,333 7,941 8,333
Total investments 357 530 30,767 33,163 31,124 33,693
Long-Term Current Total
Lender Option Borrower Option (LOBO) borrowings of £34.176 million have been included in long term borrowing as at 31
March 2026 but have a call date in the next 12 months.
The above long term figures are based on the 2016 Code which requires that in undertaking Effective Interest Rate (EIR)
calculations, the maturity period for a LOBO is taken as being the contractual period to maturity.
Financial Instruments Gains / Losses
The gains and losses recognised in the Comprehensive Income and Expenditure Account in relation to financial instruments
are as follows:
Financial Financial
Liabilities Assets
Liabilities
measured at Loans and Total Total
amortised cost receivables 2025/26 2024/25
£'000 £'000 £'000 £'000
Interest expense 29,325 0 29,325 25,519
Losses on derecognition 2,901 0 2,901 0
Interest payable and similar charges 32,226 0 32,226 25,519
Interest income 0 (1,207) (1,207) (2,551)
Gains on derecognition (6,056) 0 (6,056) 0
Interest and investment income (6,056) (1,207) (7,263) (2,551)
(Gains)/losses on revaluation (21) (5) (26) (2)
Surplus arising on revaluation of financial assets (21) (5) (26) (2)
Net loss/(gain) for the year 26,149 (1,212) 24,937 22,966
Fair Value of Liabilities Carried at Amortised Cost
The fair value of each class of financial assets and liabilities which are carried in the balance sheet as at 31 March 2026 at
amortised cost is disclosed below.    
82 | Perth and Kinross Annual Accounts 2025/26 Page 101 of 314

Page 102

83 | Perth and Kinross Council Annual Accounts 2025/26 
Methods and Assumptions in valuation technique: 
The fair value of an instrument is determined by calculating the Net Present Value (NPV) of future cash flows, which
provides an estimate of the value of payments in the future in today’s terms.
The discount rate used in the NPV calculation is the rate applicable in the market on the date of valuation for an instrument
with the same structure, terms and remaining duration.  For debt, this will be the new borrowing rate since premature
repayment rates include a margin which represents the lender's profit as a result of rescheduling the loan; this is not
included in the fair value calculation since any motivation other than securing a fair price should be ignored.
In addition, lenders do not have the ability to force the Council to repay debt early.
The rates quoted in this valuation were obtained by the Council’s treasury management consultants from the market on 31
March 2026, using bid prices where applicable.
The calculations are made with the following assumptions:
• For Public Works Loans Board (PWLB) debt, the discount rates used are the rates for new borrowing as per rate
sheet number 126/26 on 31 March 2026 (pm).
• For other market debt and investments, the discount rates used are the rates available for an instrument with the
same terms from a comparable lender.
• Interpolation techniques have been used between available rates where the exact maturity period was not available.
• No early repayment or impairment is recognised.
• Fair values have been calculated for all instruments in the portfolio.
The fair values are calculated as follows:
Fair Value of Financial Liabilities Carried at Amortised Cost
Carrying Amount Fair Value Carrying amount Fair value
£'000 £'000 £'000 £'000
Public Works Loans Board (PWLB) 757,695 479,344 655,197 379,618
Market Loans (including LOBOs) 54,691 46,562 64,823 54,785
Short-term Borrowing 18,605 18,605 1,648 1,648
Other (Special Loans) 2,805 2,805 2,721 2,721
Creditors 52,878 52,878 61,852 61,852
Total Financial Liabilties 886,674 600,194 786,241 500,624
31 March 2026 31 March 2025
The Fair value is significantly less than the carrying amount because the majority of the Council’s long-term portfolio of loans
are fixed rate loans where the interest rate payable is lower than the rates available for similar loans at the balance sheet
date.  The difference between the carrying amount and the fair value therefore represents the discount the Council would
receive from the lender in the event these loans were to be repaid at that date.  
For comparison, if the Council were to have repaid all the loans to the PWLB on the balance sheet date, a total of £515
million would have been payable after applying the PWLB’s premature redemption rates applicable on that date.  This is
higher than the Fair Value shown in the table above, as the PWLB premature redemption rates include an additional profit
margin over their comparative new borrowing rates.
Fair Value of Financial Assets Carried at Amortised Cost
Carrying Amount Fair Value Carrying amount Fair value
£'000 £'000 £'000 £'000
Cash and Cash Equivalents 17,559 17,559 24,645 24,645
Deposits with Banks and Building Societies 5,014 5,014 0 0
Mortgages 215 215 230 230
Loans to Others 395 395 485 485
Debtors (Long and short term) 7,941 7,941 8,333 8,333
Total Financial Assets 31,124 31,124 33,693 33,693
31 March 2026 31 March 2025
83 | Perth and Kinross Annual Accounts 2025/26 Page 102 of 314

Page 103

84 | Perth and Kinross Council Annual Accounts 2025/26 
Where the fair value is higher than the carrying amount it’s because the Council’s portfolio of investments includes fixed rate
deposits where the interest rate receivable is higher than rates available for similar deposits at the balance sheet date. 
Where the fair value is the same or lower than the carrying value, it’s because the interest receivable is the same or lower
than the rates on the balance sheet date, or there is only a very short time left to maturity.  For 2025/26, the fair value has
been taken as the principal amount outstanding together with accrued interest, given the short-term nature of the
instruments.
Nature and Extent of Risks Arising from Financial Instruments
The Council’s management of treasury risks is intended to minimise the Council’s exposure to the unpredictability of financial
markets and to protect the financial resources available to fund services.  The Council has fully adopted CIPFA’s Code of
Treasury Management Practices and has written principles for overall risk management as well as written policies and
procedures covering specific areas such as credit risk, liquidity risk and market risk.
(i) Credit Risk 
Credit risk arises from the short-term lending of surplus funds to banks, building societies, Money Market Funds and other
local authorities as well as credit exposures to the Council’s customers.  It is the policy of the Council to place deposits only
with a limited number of high quality banks, building societies and other financial institutions whose credit rating, together
with other market information, is independently assessed as sufficiently secure by the Council’s treasury advisers and to
restrict lending to a prudent maximum amount and duration for each institution.  The Council’s policy also includes lending to
other local authorities in the UK.
Under the terms of the Council’s approved Treasury policy, only the highest rated banks and financial institutions are used. 
Accordingly, the expected credit loss on such deposits is deemed negligible, and no expected credit loss provision has been
provided in the Income and Expenditure account for 2025/26 (2024/25 nil) on the grounds of immateriality.  Applying historic
default rates for the counterparties used by the Council as at 31 March 2026 shows the expected credit loss to be less than
0.02% to 0.03% of the principal sums deposited, whilst the actual historic default experienced by the Council is nil.  Further,
there is no information to indicate that this position has changed since the balance sheet date.
The following analysis summarises the Council’s potential maximum exposure to credit risk, based on past experience and
current market conditions.
Historical Historical experience Estimated
Amounts at 31 experience adjusted for maximum exposure
March 2026 of default market conditions to default and
as at 31 March 2026 uncollectability
£'000 % % £'000
Deposits with banks and
other financial institutions 22,000 0 0 0
Loans to Others 610 0 0 0
Customers 7,941 16.1 16.1 1,278
Total 30,551 - - 1,278
The Council’s overall exposure to credit risk in relation to its deposits in banks and other financial institutions of £22 million
above cannot be assessed generally, as the risk of non-payment of the principal sums or interest is specific to each
individual institution.  Experience indicates that any such non-payment is rare, and there is no evidence that any risk of
default existed at 31 March 2026.  The repayment profile of these deposits, including loans to others, is shown below:  
31 March 31 March
2026 2025
£'000 £'000
Less than three months 16,986 24,182
Three to six months 5,014 0
Total 22,000 24,182
84 | Perth and Kinross Annual Accounts 2025/26 Page 103 of 314

Page 104

85 | Perth and Kinross Council Annual Accounts 2025/26 
Loans to Others
The Council initiates a legal charge on property where, for example, clients require assistance with payment of care fees, but
cannot pay immediately until such time as their property is sold.  The carrying value of the total amount outstanding as at 31
March 2026 in this category is £395,000 and experience of default is minimal.  The Council has granted mortgages for
essential property repairs in shared ownership properties, as well as secured loans to property owners to bring their
properties back into use for affordable rent under the Empty Home Loans Fund (EHLF) scheme.  The total amount
outstanding as at 31 March 2026 is £215,000 with no experience of default.  The total amount of Loans to Others of
£610,000 can be analysed as follows:
31 March 31 March
2026 2025
£'000 £'000
Less than three months 63 81
Three to six months 63 77
Six months to one year 127 145
More than one year 357 412
Total 610 715
Debtors
The Council does not generally allow credit for customers, such that £3.141 million of the £7.941 million balance is past its
due date for payment.
31 March 31 March
2026 2025
£'000 £'000
Less than three months 48 1,901
Three to six months 232 1,085
Six months to one year 910 884
More than one year 1,951 1,523
Total 3,141 5,393
(ii) Liquidity Risk
The Council has access to borrowings from the money markets to cover day to day cashflow needs, as well as borrowing
from the Public Works Loans Board or money markets for longer term funding requirements.  As a result, there is no
significant risk that the Council will be unable to raise finance to meet its commitments under financial instruments.  The
Council manages its portfolio in conjunction with interest rate forecasts to reduce the risk of a large proportion of its
borrowing maturing at a time of higher interest rates, and so reduce the financial impact of re-financing at an unfavourable
time.  In addition, the monitoring of interest rate movements for the identification of debt rescheduling opportunities to amend
the maturity profile, as well as achieving savings in interest charges, is undertaken on a continuous basis to further mitigate
any refinancing risks.  
85 | Perth and Kinross Annual Accounts 2025/26 Page 104 of 314

Page 105

86 | Perth and Kinross Council Annual Accounts 2025/26 
The maturity structure of financial liabilities is as follows (at nominal value):
Loans outstanding 31 March 31 March
2026 2025
£'000 £'000
Public Works Loans Board 754,000 652,000
Market debt 53,200 63,200
Temporary borrowing 18,287 1,599
Local bonds 2,796 2,711
Total 828,283 719,510
Less than 1 year 129,389 36,810
Between 1 and 2 years 125,805 27,500
Between 2 and 5 years 97,139 87,500
Between 5 and 10 years 3,750 20,000
Between 10 to 15 years 5,000 5,000
More than 15 years 467,200 542,700
Total 828,283 719,510
In the more than 15 years category there are £33.2 million of LOBO borrowings which have a call date in the next 12
months.
(iii) Market Risk
Interest rate risk
The Council is exposed to interest rate risk in two different ways: the first being the uncertainty of interest paid/received on
variable rate instruments and the second being the effect of fluctuations in interest rates on the fair value of an instrument.
The current interest rate risk for the Council is summarised below:
• Reductions in interest rates will affect interest earned on variable rate investments, and reduces income credited to
the Comprehensive Income and Expenditure Statement.  There would only be a small reduction in the interest
payable on variable rate borrowing.  
• Increases in interest rates will affect interest paid on variable rate borrowings, and increases the interest expense
charged to the Comprehensive Income and Expenditure Statement, but is offset by increased investment returns.  
• The fair value of fixed rate financial assets will fall if interest rates rise.  This will not impact the balance sheet for
assets held at amortised cost, but will impact the disclosure note for fair value.  It would have a negative effect on the
balance sheet for any assets held at fair value in the balance sheet, which would also be reflected in the
Comprehensive Income and Expenditure Statement.  However, no such assets at fair value were held by the Council
as at 31 March 2026.  
• The fair value of fixed rate financial liabilities will rise if interest rates fall.  This will not impact the balance sheet for
liabilities held at amortised cost, but will impact the disclosure note for fair value.  
The Council has a number of strategies for managing interest rate risk.  The policy is to keep a maximum of 35% of its
borrowings in variable rate loans.  During periods of falling interest rates, and where economic circumstances make it
favourable, fixed rate loans may be repaid early to limit exposure to higher costs, whilst fixed deposits may be undertaken
for longer periods (within policy and counterparty limits).  
The treasury management team has an active strategy for assessing interest rate exposure that feeds into the setting of the
annual budget and which is used to update the budget throughout the year.  This allows any favourable or adverse changes
to be accommodated.  The analysis will also advise whether new borrowing taken out is fixed or variable.
According to this assessment strategy, at 31 March 2026, if interest rates had been 1% higher with all other variables held
constant, the financial effect would be:
£'000
Increase in interest payable on variable rate borrowings 543
Increase in interest receivable on variable rate investments (845)
Impact on Comprehensive Income and Expenditure Statement (302)
Share of overall impact credited to the HRA (66)
86 | Perth and Kinross Annual Accounts 2025/26 Page 105 of 314

Page 106

87 | Perth and Kinross Council Annual Accounts 2025/26 
The impact of a 1% fall in interest rates would have been an estimated cost of £845,000 to the Council as a result of a
reduction in investment income, whilst it would be unlikely that the lenders of the market loans borrowed would pass on the
reduction in rates payable.  However, there would be a reduction of £211,000 payable on other loans.  Therefore, the net
cost of a 1% fall in interest rates would be £634,000 of which £139,000 would be debited to the HRA.
Foreign Exchange Risk
The Council has no financial assets or liabilities denominated in foreign currencies and thus has no exposure to losses
arising from movements in exchange rates.  
Price Risk
The Council does not invest in equities, however, does invest in other tradable instruments but with the intention of holding
them until their maturity date.  Therefore, the Council does not actively trade in such instruments, and is therefore not
exposed to gains or losses on movements in their price. The Council held no such financial instruments at 31 March 2026.
40. Devolved School Management (DSM) Schools
The accumulated balance on the General Fund at 31 March 2026 includes net surplus funds of £542,000 (31 March 2025
£527,000) in respect of schools participating in the Devolved School Management scheme.  There are a small number of
schools carrying forward deficits of £27,000 with the remaining schools having surpluses of £554.000.  These balances are
earmarked in 2025/26 for the individual schools concerned.
There is Pupil Equity Funding from the Scottish Government of £103,000 (31 March 2025 £195,000) which is being carried
forward to 2026/27 for schools within the Council’s earmarked general fund balances.
41. Operating Activities
The cash flows for operating activities include the following items:
2025/26 2024/25
£'000 £'000
Interest received (1,226) (994)
Interest paid 33,286 29,035
32,060 28,041
42. Investing Activities
2025/26 2024/25
£'000 £'000
Purchase of property, plant and equipment, investment property and intangible assets (141,690) (170,611)
Purchase of short-term and long-term investments (5,014) (6,000)
Proceeds from the sale of property, plant and equipment, investment property and
intangible assets 578 902
Proceeds of short-term and long-term investments 0 42,560
Other receipts for investing activities 24,198 42,079
(121,928) (91,070)
43. Financing Activities
2025/26 2024/25
£'000 £'000
Cash receipts of short and long-term borrowing 425,353 162,659
Cash payments for the reduction of the outstanding liabilities relating to fiannce leases and
on balance sheet PFI contracts (7,787) (8,857)
Repayments of short and long-term borrowing (316,097) (73,804)
101,469 79,998
87 | Perth and Kinross Annual Accounts 2025/26 Page 106 of 314

Page 107

88 | Perth and Kinross Council Annual Accounts 2025/26 
44. Cash and Cash Equivalents
The balance of cash and cash equivalents is made up of the following elements:
2025/26 2024/25
£'000 £'000
Petty Cash held 31 25
Bank current accounts 543 438
Short-term deposits with banks and building societies 216 42
Short-term deposits with Local Authorities 11,019 15,025
Short-term deposits with other organisations 5,750 9,115
Total cash and cash equivalents 17,559 24,645
45. Trust Funds
Perth and Kinross Council administers a number of Charitable Funds of varying sizes.  The Income and Expenditure
Account and Balance Sheet are detailed on page 98.
These funds include Educational Trusts and other trusts which are primarily for the residents of Perth and Kinross.  An
exercise has been undertaken to reorganise many of the non-educational trusts in order for the funds to be more readily
accessible.
The Perth and Kinross Educational Trust gives financial assistance towards scholarships, second or subsequent degrees,
mature students and further education.  Assistance is also provided to schools for sports facilities and special equipment,
promoting visual arts and education in music and drama.  There are also preferences for certain beneficiaries usually named
schools for prizes etc.  Also, within the Perth and Kinross Educational Trust there are eight individual endowments for
maintaining, furnishing and equipping school buildings.
The other charitable trusts purposes include providing financial assistance in different areas of Perth and Kinross.
31 March 31 March
2026 2025
£'000 £'000
Educational Trust - Financial Assistance
Net Assets 1,150 1,068
Net Incoming/(Outgoing) Resources before other recognised gains and losses 6 7
Educational Trust - Endowments
Net Assets 53 50
Other Charitable Trusts
Net Assets 2,854 2,663
Net Incoming Resources before other recognised gains and losses 20 39
Total Net Assets 4,057 3,781
Total Net Incoming Resources before other recognised gains and losses 26 46
Detailed Accounts for the Charities are available from the Chief Finance Officer, 2 High Street, Perth, PH1 5PH by contacting
chxfinance@pkc.gov.uk or phoning 01738 475000. 
88 | Perth and Kinross Annual Accounts 2025/26 Page 107 of 314

Page 108

89 | Perth and Kinross Council Annual Accounts 2025/26 
46. The Statutory Loans Fund
Loans Fund accounting is governed by The Local Authority (Capital Financing and Accounting) (Scotland) Regulations 2016,
which came into force on 1 April 2016, and amended by the Local Authority (Capital Finance and Accounting) (Scotland)
Amendment Regulations 2024 (the 2024 Amendment Regulations) which came into force on 1 April 2024.  These
regulations outline the way the Loans Fund is operated in relation to the repayment period and method that capital advances
(capital expenditure funded by borrowing) are repaid (charged) on an annual basis. 
The Loans Fund is an internal fund operated by the Council to manage the amortisation of capital expenditure (capital
advances) over the life of the various assets being funded by borrowing, and also to manage the external borrowing raised
to finance the capital expenditure.  Whilst both elements of the Loans Fund operate independently of each other, because
they are based on the same capital plans, they will broadly be consistent to each other over the long term.  However,
significant differences may arise over the short-term.  This may include, for example, delaying external borrowing due to
unfavourable prevailing interest rates, where the Council’s daily cashflow remains positive, or where the Council has
significant levels of Reserves.
The annuity repayment method is used for all internal capital advances through the Loans Fund.  For advances made from
2024/25, the Council applies a 4.0% annuity rate as an appropriate rate to calculate the annual repayment of the loans fund
advances, whilst advances from previous years continue to calculate the annual repayments using a 6.25% annuity rate. 
The Council repays (amortises) the capital advances over the life of the asset being funded, up to a maximum of 50 years. 
The Council also defers the repayment of Loans Fund advances until the asset being funded is completed and operational. 
Therefore, the total number of years may exceed 50 years from the year the capital expenditure was incurred where the total
expenditure on an asset is spread over two or more years before the asset becomes operational. 
The value of Loans Fund advances outstanding at 31 March 2026 is £888.9 million.  This is made up as follows:
Advances Debt Repaid Net Advances Advances
1 April 2025 Transferred 2025/26 2025/26 31 March 2026
£'000 £'000 £'000 £'000 £'000
General Fund 569,907 0 (3,228) 61,773 628,452
Prudential Borrowing 50,705 0 (3,190) 14,113 61,628
Sub Total 620,612 0 (6,418) 75,886 690,080
HRA 168,883 0 (3,502) 33,439 198,820
Total 789,495 0 (9,920) 109,325 888,900
The estimated future repayments of these advances is summarised in the table below:
General Fund Prudential Sub Total: HRA Total
Borrowing General Fund 31 March 2026
£'000 £'000 £'000 £'000 £'000
Within 1 year 3,915 4,010 7,925 3,013 10,938
Between 1 and 2 years 4,317 3,670 7,987 3,187 11,174
Between 2 and 5 years 14,264 10,143 24,407 10,390 34,797
Between 5 and 10 years 27,922 7,758 35,680 20,573 56,253
Between 10 and 15 years 37,666 5,396 43,062 22,697 65,759
between 15 and 20 years 50,004 4,867 54,871 22,702 77,573
Between 20 and 25 years 66,457 5,501 71,958 21,012 92,970
More than 25 years 423,907 20,283 444,190 95,246 539,436
Total 628,452 61,628 690,080 198,820 888,900
Comparison of the outstanding capital advances above with the Council’s long-term external debt demonstrates that actual
capital expenditure funded by borrowing is higher than the actual borrowing undertaken to date by around £81.7 million. 
This “under-borrowed” position has increased from £74.3 million at the start of the year.  This reflects the strategy adopted in
recent years of deferring new borrowing whilst rates were at high levels and applying maturing investment balances to meet
immediate cashflow requirements.  New borrowing would only be undertaken when there were insufficient available
balances, or where rates dropped below current forecasts.  It should also be noted that the Council has approved a
significant borrowing requirement over the next 6 years on its Capital programmes. 
The Council approved its new Composite Capital Budget to 2031/32 on 4 March 2026 (Report No. 26/55 refers), whilst the
Housing and Social Wellbeing Committee approved the HRA Capital Investment Programme to 2030/31 on 21 January 2026
(Report No. 26/21 refers).  The last report to the Finance and Resources Committee on 22 April 2026 (Report No. 26/111
refers) approved adjustments to these Programmes. 
89 | Perth and Kinross Annual Accounts 2025/26 Page 108 of 314

Page 109

90 | Perth and Kinross Council Annual Accounts 2025/26 
The latest approved General Fund (Composite) Capital Budget and Housing Investment (HRA) Programme includes the
amount of capital expenditure to be funded by borrowing (i.e. new Loans Fund advances) in each of the next 6 years as
follows:
General Housing Total
Fund Investment
Programme
£'000 £'000 £'000
2026/27 107,840 32,605 140,445
2027/28 79,904 16,874 96,778
2028/29 64,581 9,196 73,777
2029/30 54,825 7,432 62,257
2030/31 57,362 18,735 76,097
2031/32 31,063 0 31,063
Total 395,575 84,842 480,417
All the above Loans Fund repayments have been included in the Loan Charge estimates within the approved Medium-Term
Financial Plan and therefore remain affordable under the current Loan Charge Budget strategy.  This also includes estimates
of new borrowing for the years beyond 2031/32.   
90 | Perth and Kinross Annual Accounts 2025/26 Page 109 of 314

Page 110

PKC - GENERAL#
2024/25
£'000 £'000 £'000 £'000
Income
(33,613) Dwelling Rents (36,414)
519 less Voids 495
(35,919)
(619) Non-Dwelling Rents (653)
38 less Voids 42
(611)
(1,762) Other Income (1,992)
(35,437) Total Income (38,522)
Expenditure
8,878 Repairs and Maintenance 9,605
16,174 Supervision and Management 16,567
12,831 Depreciation, impairment and revaluation losses on non current assets 16,068
77 Movement in the Impairment of Debtors 203
279 Other expenditure 304
38,239 Total Expenditure 42,747
2,802 Net Expenditure for HRA Services as included in the
Comprehensive Income and Expenditure Statement
4,225
269 HRA services' share of Corporate and Democratic Core 225
3,071 Net Expenditure for HRA Services 4,450
HRA share of the operating income and expenditure included
in the Comprehensive Income and Expenditure Statement:
(39) (Gain) / Loss on sale of HRA Non-Current Assets 199
4,998 Interest payable and similar charges 5,455
(247) Interest and investment income (128)
(167) Net Interest on the net defined benefit liability 2
0 Market value investment properties 85
(10,365) Capital Grants and Contributions Receivable (8,722)
(2,749) Deficit/(surplus) for the year on HRA services 1,341
HOUSING REVENUE ACCOUNT INCOME AND EXPENDITURE STATEMENT
2025/26
The Housing Revenue Account (HRA) Income and Expenditure Statement shows the economic cost in the year of
providing housing services in accordance with generally accepted accounting practices, rather than the amount to be
funded from rents and government grants.  Councils charge rents to cover expenditure in accordance with the
legislative framework which may be different from the accounting cost.  The increase or decrease in the year, on the
basis on which rents are raised, is shown in the Statement of Movements on the Housing Revenue Account
Balance.
91 | Perth and Kinross Annual Accounts 2025/26 Page 110 of 314

Page 111

PKC - GENERAL#
2024/25
£'000 £'000 £'000
(2,260) Balance on the HRA at the end of the Previous Year (2,258)
(2,749) Deficit/(Surplus) for the year on the HRA Income and Expenditure Account 1,341
1,975 Adjustments to Usable reserves permitted by Statute (4,148)
776 2,312
2 Net Decrease before Transfers to or from Reserves (495)
0 Transfer from Reserves 0
2 Movement in Year on the HRA (495)
(2,258) Balance on the HRA at the end of the Current Year (2,753)
Note to the Statement of Movement on the HRA Balance
2024/25
£'000 £'000 £'000
39 (Gain)/Loss on sale of HRA Non-current assets (199)
(14,194) Depreciation and impairment of non current assets (17,082)
587 Revaluation Loss/(gain) (1,297)
Capital Grants and Contributions credited to the Comprehensive Income and Expenditure
10,365 Statement 8,722
0 Movements in Fair Value of Investment properties (85)
(37) Adjustments involving Short Term Accumulated Absences Account (46)
Reversal of items relating to retirement benefits credited to the Comprehensive Income
(1,544) and Expenditure Statement (1,482)
(4,784) (11,469)
1,707 1,801
year
136 Adjustments involving the Financial Instruments Adjustment Account 136
3,083 Statutory provision for the repayment of debt 3,503
1,833 Capital expenditure charged to the HRA balances 1,881
6,759 7,321
1,975 (4,148)
STATEMENT OF MOVEMENTS ON THE HOUSING REVENUE ACCOUNT BALANCE
Net additional amount required by statute to be (credited)/debited to the HRA
Balance for the year
Employer's pension contributions and direct payments to pensioners payable in the
Adjustments between Accounting Basis and Funding Basis Under Statute
Items included in the HRA Income and Expenditure Account but excluded from the
movement on HRA Balance for the year
Items not included in the HRA Income and Expenditure Account but included in the
movement on HRA Balance for the year
2025/26
2025/26
The Statement of Movement on the Housing Revenue Account balance reconciles the Housing Revenue Account to the
HRA balance, an earmarked element of the Council’s General Fund Balance.
92 | Perth and Kinross Annual Accounts 2025/26 Page 111 of 314

Page 112

PKC - GENERAL#
THE ACCOMPANYING NOTES TO THE HOUSING REVENUE ACCOUNT INCOME AND EXPENDITURE
STATEMENT
1. Housing Stock at 31 March 2026 No. of Dwellings No. of Dwellings
31 March 2026 31 March 2025
Sheltered accommodation 284 284
Detached/Semi-Detached/Terraced 4,019 3,965
High Rise Flats 194 152
Tenement Flats/Other Flats/Maisonettes 3,871 3,825
Total 8,368 8,226
2. Rent Arrears at 31 March 2026 Gross Arrears Gross Arrears
31 March 2026 31 March 2025
£'000
% of
Income £'000
% of
Income
Houses 3,361 9.2 3,281 9.8
Other Subjects 118 18.1 73 11.8
Totals 3,479 10.2 3,354 9.8
3. Impairment of Debtors
impairment in 2024/25.
In 2025/26 an impairment of £2.126 million has been provided in the Balance Sheet, an increase of £203,000 from the
93 | Perth and Kinross Annual Accounts 2025/26 Page 112 of 314

Page 113

PKC - GENERAL#
2024/25 2025/26
£'000 £'000 £'000
120,432 Gross Charge 132,876
Deduct -
(3,716) Exemptions (3,976)
(204) Disabled Relief (229)
(6,763) Discounts and Reductions (7,723)
(7,590) Council Tax Reduction Scheme (8,426)
102,159 Net Council Tax 112,522
Deduct -
(7) Ministry of Defence Properties (8)
7 Contribution Received 8
0
(1,765) Provision for  Bad and Doubtful Debts (1,881)
100,394 Total Council Tax Income 110,641
(15) Adjustments for prior years for Council Tax (839)
100,379 Total Council Tax Income to Comprehensive Income and Expenditure Statement 109,802
COUNCIL TAX INCOME ACCOUNT
The Council Tax Income Account shows the gross income raised from Council Taxes levied and deductions made under
statute. The resultant net income is transferred to the Comprehensive Income and Expenditure Statement of the Council.
94 | Perth and Kinross Annual Accounts 2025/26 Page 113 of 314

Page 114

PKC - GENERAL#
THE ACCOMPANYING NOTES TO THE COUNCIL TAX INCOME ACCOUNT
1.  CALCULATION OF THE COUNCIL TAX BASE AT 31 MARCH 2026
2025/26 2024/25
A B C D E F G H TOTAL TOTAL
No. of Properties 8,725 15,056 13,101 12,094 12,469 8,495 6,877 721 77,538 77,100
Exemptions (671) (636) (474) (282) (250) (122) (96) (23) (2,554) (2,720)
Disabled Relief 66 48 (2) 35 (52) (5) (85) (5) 0 0
Discounts (1,400) (1,971) (1,436) (1,106) (861) (454) (277) (28) (7,533) (7,400)
Effective No. of Properties 6,720 12,497 11,189 10,741 11,306 7,914 6,419 665 67,451 66,980
Ratio 240/360 280/360 320/360 360/360 473/360 585/360 705/360 882/360
Band D Equivalents 4,477 9,720 9,946 10,741 14,855 12,860 12,570 1,629 76,798 76,162
Contributions in lieu 7 7
TOTAL 76,805 76,169
Provision for non-payment at 1.75% (1,344) (1,333)
COUNCIL TAX BASE 75,461 74,836
2.  THE COUNCIL TAX CHARGE
Fraction 2025/26 2024/25
Valuation of Actual Actual
Band band D Charge Charge
A 240/360 £1,024.69 £935.79
B 280/360 £1,195.47 £1,091.75
C 320/360 £1,366.25 £1,247.72
D 360/360 £1,537.04 £1,403.69
E 473/360 £2,019.49 £1,844.29
F 585/360 £2,497.69 £2,280.99
G 705/360 £3,010.03 £2,748.89
H 882/360 £3,765.74 £3,439.04Over £212,000
£0 - £27,000
£27,001 - £35,000
£45,001 - £58,000
£35,001 - £45,000
£106,001 - £212,000
£80,001 - £106,000
£58,001 - £80,000
Range
The valuation bands, the fractions used in calculating the Council Tax payable for each valuation band and the actual charges determined for
2025/26 are set out below:
Each property is placed in one of eight valuation bands (A-H) in accordance with their value as at 1 April 1991. The Council Tax charge levied for
each property is calculated in proportion to the Council Tax charge for a band D property by applying fractions. 
A discount of 25% is given where there is only one adult resident in a property or where all others are disregarded for Council Tax purposes; those
disregarded include persons in detention, students, and those with a severe metal impairment. Where a dwelling is occupied only by disregarded
persons a full exemption may apply. A 200% charge is payable on long term empty dwellings and most second homes. Second homes that are job-
related or purpose-built holiday homes can receive a 50% discount. Reductions in Council Tax are also granted for dwellings adapted to meet the
needs of persons with a disability.
The Council Tax is based on the value of a domestic property together with a personal element which takes into account the number and
circumstances of that property's occupants.
Property
Valuation
95 | Perth and Kinross Annual Accounts 2025/26 Page 114 of 314

Page 115

PKC - GENERAL#
2024/25
£'000 £'000 £'000
90,104 Gross Rate Levied 91,019
738 Discretionary Relief funded by the Council 747
(1,218) Transitional Relief (731)
91,035
Deduct:
(3,138) Rate Rebates (3,212)
(10) Interest on Overpaid Rates (1)
(19,446) Reliefs, Charities etc. (21,199)
(369) Provision for Bad and Doubtful Debts (456)
(24,868)
Adjustments to Previous Years:
(1,319) Gross Rate Levied (1,557)
56 Transitional Surcharge/Relief (355)
(1,002) Reliefs, Charities etc. (1,018)
(156) Impairment for Bad and Doubtful Debts and Abatements (724)
(3,654)
64,240 Net Non-Domestic Rate Income- 62,513
(64,240) Contribution to National Non-Domestic Rate Pool (62,513)
64,717 Contribution from National Non-Domestic Rate Pool 63,537
477 Net contribution (to) / from National Non-Domestic Rate Pool 1,024
64,717 Total Non-Domestic Rate Income to Comprehensive Income 63,537
and Expenditure Statement
2025/26
NON-DOMESTIC RATE INCOME ACCOUNT
The Non-Domestic Rate Account is an agent's statement that reflects the statutory obligation for billing
authorities to maintain a separate Non-Domestic Rate Account. The statement shows the gross income from
the rates and deductions made under statute. The net income is paid to the Scottish Government as a
contribution to the national Non-Domestic Rate pool.
96 | Perth and Kinross Annual Accounts 2025/26 Page 115 of 314

Page 116

PKC - GENERAL#
THE ACCOMPANYING NOTES TO THE NON-DOMESTIC RATE INCOME ACCOUNT
1.  NON-DOMESTIC RATES
2.  RATEABLE SUBJECTS AND VALUES
Rateable Rateable
No. of Value No. of Value
Subjects £'000 Subjects £'000
at 1 April 2024 at 1 April 2024 at 1 April 2025 at 1 April 2025
1,689 34,446 Shops 1,690 33,614
78 1,645 Public Houses 78 1,607
1,043 13,401 Offices (including banks) 1,040 13,110
204 14,672 Hotels etc. 202 14,443
1,781 26,142 Industrial Subjects etc. 1,813 26,394
1,824 13,876 Leisure, Entertainment, Caravans etc. 1,857 13,895
150 5,007 Garages and Petrol Stations 151 5,047
59 1,471 Cultural 60 1,699
1,405 3,256 Sporting Subjects 1,403 3,151
119 16,697 Education and Training 119 16,750
421 8,677 Public Service Subjects 417 8,670
1 0 Communications 1 0
23 535 Quarries, Mines etc. 23 535
2 4,165 Petrochemical 2 3,876
238 1,914 Religious 237 1,917
114 6,296 Health, Medical 113 6,292
750 2,363 Other 721 2,072
60 3,556 Care Facilities 59 3,777
28 89 Advertising 22 103
96 12,883 Undertaking 97 12,975
10,085 171,091 Total 10,105 169,927
Non-Domestic Rates Income is set and pooled nationally but generated and collected locally by Scottish Local Authorities.
It is distributed back to those local authorities through a distribution formula agreed with COSLA as part of the local
government finance settlement, therefore it bears no direct relationship to the amounts collected by those authorities. The
rate poundage set by the Scottish Government for 2025/26 was 49.8p (unchanged from 2024/25). 
The Small Business Bonus Scheme, introduced from 1 April 2008, provides relief to businesses based on their combined
rateable value.  Significant changes were made from 1 April 2023; the combined rateable value threshold remained at
£35,000 with relief now available on all individual properties with a rateable value of £20,000 or less.  Subject to eligibility,
this provides 100% relief where the rateable value is £12,000 or less and a tapered award where the rateable value is
greater than £12,000. Awards totalling around £10 million were provided to businesses within the Perth and Kinross area
in 2025/26.
A supplement of 4.7p was charged on properties with a rateable value of between £51,001 and £100,000 and a
supplement of 6.1p was charged on properties with a rateable value exceeding £100,000 to contribute towards the
additional cost of the Small Business Bonus scheme (4.7p and 6.1p respectively in 2024/25).
97 | Perth and Kinross Annual Accounts 2025/26 Page 116 of 314

Page 117

98 | Perth and Kinross Council Annual Accounts 2025/26 
Charitable Trusts
The Council administers Perth and Kinross Educational Trust and various other Charitable Trusts and Endowments.  The
figures below summarise the aggregate income and expenditure for the year and the assets and liabilities at 31 March 2026. 
2025/26 2025/26 2024/25
£'000 £'000 £'000
Incoming Resources
Income resources from generated funds:
Income from donations and legacies 0 96
Investment income 172 158
Total Incoming Resources 172 254
Resources Expended
Costs of generating funds:
Investment management costs 18 17
Charitable activities 115 159
Governance costs 13 12
Reorganisation of trusts 0 20
Total Resources Expended 146 208
26 46
Other Recognised Gains:
Gains on revaluation of fixed assets for charity's own use 4 0
Gain/(losses) on Investment Assets 246 12
Net Movement in Funds for the Year 276 58
Reconciliation of Funds
Total Funds Brought Forward 3,781 3,723
Total Funds Carried Forward 4,057 3,781
INCOME AND EXPENDITURE ACCOUNT FOR YEAR TO 31 MARCH 2026
Net Incoming Resources before other Recognised Gains and Losses
2025/26 2025/26 2024/25
£'000 £'000 £'000
Fixed Assets
Tangible Assets 84 80
Investments 3,427 3,210
3,511 3,290
Current Assets
Debtors 3 26
Investments - Amounts due by Perth and Kinross Council
Loans Fund 562 474
565 500
Liabilities
Creditors: amounts falling due within one year (19) (9)
Net Current Assets 546 491
Net Assets 4,057 3,781
Total Funds 4,057 3,781
BALANCE SHEET AS AT 31 MARCH 2026
Notes to Charitable Trusts
1. The market value of Investments at 31 March 2026 was £3.427 million (31 March 2025 £3.210 million).
2. The unaudited accounts were issued on 29 June 2026. 
Scott Walker CPFA
Chief Finance Officer
Date:  
98 | Perth and Kinross Annual Accounts 2025/26 Page 117 of 314

Page 118

99 | Perth and Kinross Council Annual Accounts 2025/26 
Common Good
The Council administers the Common Good Accounts for ten former burghs within Perth and Kinross.  The figures below
summarise the aggregate income and expenditure for the year and detail the Assets and Liabilities at 31 March 2026.
2025/26 2025/26 2024/25
£'000 £'000 £'000
Expenditure
Grants to Voluntary Organisations 233 161
Christmas Lighting 30 39
Property Costs 95 60
Supplies and Services 15 15
373 275
Income
Rents, Fees, Charges etc. 288 285
Interest on Loans 111 130
Other 0 15
399 430
Operating Surplus for the Year 26 155
Surplus Brought Forward 2,525 2,370
Accumulated Surplus at 31 March 2,551 2,525
INCOME AND EXPENDITURE STATEMENT FOR YEAR TO 31 MARCH 2026
2025/26 2025/26 2024/25
£'000 £'000 £'000
Fixed Assets
Property, Plant and Equipment 5,480 5,363
Right of Use Asset 10 20
Current Assets
Debtors 27 22
Investments 2,803 2,693
Cash and Cash Equivalents 147 168
2,977 2,883
Current Liabilities
Creditors and Accruals (146) (78)
Net Current Assets / (Liabilities) 2,831 2,805
Long Term Liability - Right of Use 0 (10)
Total Net Assets 8,321 8,178
Reserves
Revenue 2,551 2,525
Capital 477 477
Revaluation Reserve 5,293 5,176
8,321 8,178
BALANCE SHEET AS AT 31 MARCH 2026
The unaudited accounts were issued on 29 June 2026. 
Scott Walker CPFA
Chief Finance Officer
Date:   
99 | Perth and Kinross Annual Accounts 2025/26 Page 118 of 314

Page 119

100 | Perth and Kinross Council Annual Accounts 2025/26 
The Accompanying Notes to the Common Good Accounts
1. The use of common good assets is accounted for on a risk and rewards based approach.  The Council General Fund or
Housing Revenue Account will meet the day-to-day operating costs of the property, and any repairs or improvement
works required to the property, in return for the use of the common good asset for the delivery of Council services.  No
rent for the use of the property is payable to the Common Good Fund on the basis that the Fund benefits from the
Council expenditure incurred in maintaining and upgrading the sites.  No expenditure is charged to the Common Good
Fund for the Council expertise in managing the assets.
In respect of common good sites that are leased out to a party external to the Council, the tenant will bear the
responsibility for the upkeep of the property.  The Common Good Fund is, therefore, credited with the annual rental
income arising from the lease agreement. 
2. Depreciation
Depreciation on Common Good Funds is charged on buildings, based on current value less residual value over the
remaining useful life of the property.  The buildings have a life expectancy of over 50 years and depreciation has been
charged on a straight line basis over that period.
3. Common Good Reserve Funds
Surplus /
Balance at (Deficit) Balance at
1 April 2025 2025/26 31 March 2026
Fund: £'000 £'000 £'000
Perth City 1,820 6 1,826
Aberfeldy 132 4 136
Abernethy 3 0 3
Alyth 22 0 22
Auchterarder 327 9 336
Blairgowrie 22 1 23
Crieff 16 1 17
Kinross 171 2 173
Pitlochry 12 3 15
Total 2,525 26 2,551
Coupar Angus Common Good Fund has a nil balance for both years. 
4. Common Good Fixed Assets
The Community Empowerment (Scotland) Act 2015 requires the Council to establish and maintain a list of property which
is held as part of the Common Good.  The review of property titles to facilitate the publication of the list has been
completed, and following a period of public consultation, the findings are now available on the Common Good Land
Register page of the Perth and Kinross Council website. 
The review of moveable Common Good property has continued in 2025/26 and is expected to complete in 2026/27.
5. Right of Use Assets 
IFRS 16 Leases has been applied to the Perth site leased in for the storage of Christmas lighting.  It is therefore
considered a Right of Use asset, and results in a Balance Sheet asset in respect of the site with a corresponding liability
for the remaining lease payments. 
The opening balance of the asset and liability is £20,000, the principal repaid during the year is £10,000, and the liability
at 31 March 2026 is £10,000. 
The PWLB rate used for the calculation of the liability at 1 April 2025 is 5.24%, and the Interest expense charged to the
Income and Expenditure Statement during the year is £1,000 (2024/25 £1,500). 
100 | Perth and Kinross Annual Accounts 2025/26 Page 119 of 314

Page 120

Restated Restated
Authority's Authority's
General Housing Capital Insurance Capital Capital Total Unusable TOTAL share of share of TOTAL
Fund Revenue Fund Fund Receipts Grants Usable Reserves Authority subsidiaries associates Reserves
Balance Account Reserve Unapplied Reserves Reserves and managed and joint
funds ventures
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 1 April 2024 (83,794) (2,260) (31,026) (1,709) (2,102) (87) (120,978) (718,738) (839,716) (29,576) (5,441) (874,733)
Movement in reserves during
2024/25
Adjustment on transition to new
accounting arrangements for
leases 0 0 0 0 0 0 0 0 0 0 (4,195) (4,195)
(83,794) (2,260) (31,026) (1,709) (2,102) (87) (120,978) (718,738) (839,716) (29,576) (9,636) (878,928)
Movement in reserves during
2024/25
Total Comprehensive Income
and Expenditure 28,909 (2,749) 0 0 0 0 26,160 83,859 110,019 3,757 (3,097) 110,679
Adjustments to Usable
Reserves permitted by
accounting standards (6,187) 776 0 0 0 0 (5,411) 5,411 0 0 0 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis (9,178) 1,975 0 0 770 (1,060) (7,493) 7,493 0 0 0 0
Adjustment to the statutory
repayment of debt for service
concession arrangements -
permitted flexibility (2,914) 0 0 0 0 0 (2,914) 2,914 0 0 0 0
(Increase)/Decrease in
2024/25 10,630 2 0 0 770 (1,060) 10,342 99,677 110,019 3,757 (3,097) 110,679
Transfers to/(from) Other
Statutory Reserves 4,880 0 (5,966) 1,086 0 0 0 0 0 0 0 0
Balance at 31 March 2025
carried forward (68,284) (2,258) (36,992) (623) (1,332) (1,147) (110,636) (619,061) (729,697) (25,819) (8,538) (768,248)
Total Comprehensive Income
and Expenditure 41,231 1,341 0 0 0 0 42,572 (43,046) (474) 202 3,836 3,564
Adjustments to Usable
Reserves permitted by
accounting standards (6,697) 2,312 0 0 0 0 (4,385) 4,385 0 0 0 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis (28,802) (4,148) 0 0 (174) (215) (33,339) 33,339 0 0 0 0
Adjustment to the statutory
repayment of debt for service
concession arrangements -
permitted flexibility (2,746) 0 0 0 0 0 (2,746) 2,746 0 0 0 0
(Increase) or Decrease in
2025/26 2,986 (495) 0 0 (174) (215) 2,102 (2,576) (474) 202 3,836 3,564
Transfers to/(from) Other
Statutory Reserves 4,365 0 (2,477) (1,888) 0 0 0 0 0 0 0 0
Balance at 31 March 2026
carried forward (60,933) (2,753) (39,469) (2,511) (1,506) (1,362) (108,534) (621,637) (730,171) (25,617) (4,702) (764,684)
GROUP MOVEMENT IN RESERVES STATEMENT
101 | Perth and Kinross Annual Accounts 2025/26 Page 120 of 314

Page 121

2024/25
Net Note Gross Income Net
Expenditure Expenditure Expenditure
£'000 £'000 £'000 £'000
SERVICES
167,974 Education and Learning 183,268 (5,914) 177,354
97,228 Health and Social Care 245,219 (134,949) 110,270
24,007 Children, Families and Justice 30,612 (5,946) 24,666
29,203 Economy, Development and Planning 44,949 (23,028) 21,921
49,874 Environment and Infrastructure 59,643 (12,429) 47,214
19,026 Housing and Communities 32,571 (13,884) 18,687
78,966 Property Services 95,206 (9,374) 85,832
4,559 Legal and Governance 5,335 (1,330) 4,005
17,186 Customer and Digital Services 32,959 (15,397) 17,562
5,505 Strategic Planning, People and Performance 5,524 (303) 5,221
283 Projects and Programmes 325 0 325
8,289 Finance and Business Support 11,189 (2,656) 8,533
1,327 Directorate Core Costs 578 (2) 576
2,802 Housing Revenue Account 42,747 (38,522) 4,225
1,434 Valuation Joint Board 1,393 0 1,393
112 Charitable Trusts 146 0 146
(25) Common Good 373 (288) 85
507,750 COST OF SERVICES 792,037 (264,022) 528,015
(106) Other Operating Expenditure / Income 1,728 (769) 959
18,832 Financing and Investment Income and Expendtiure 4 28,506 (5,227) 23,279
(498,321) Taxation and Non-Specific Grant Income 0 (510,772) (510,772)
28,155 Deficit  on Provision of Services 822,271 (780,790) 41,481
2,473 Share of the (Surplus)/Deficit on the provision of services by
Associates and Joint Ventures (1,566)
30,628 Group Deficit 39,915
83,470 (Surplus)/Deficit on revaluation of non current assets (46,869)
1,002 Remeasurement of the net defined benefit liability 5,044
1,148 Other gains and losses 72
(5,202) Share of the other comprehensive income and expenditure of
Associates and Joint Ventures 5,402
80,418 Other Comprehensive Income and Expenditure (36,351)
111,046 Total Comprehensive Income and Expenditure 3,564
2025/26
GROUP COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT
102 | Perth and Kinross Annual Accounts 2025/26 Page 121 of 314

Page 122

31 March 2025 Notes 31 March 2026
£'000 £'000
1,593,666 Property, Plant and Equipment 1,694,595
52,099 Heritage Assets 52,099
16,184 Investment Property 17,029
2,189 Intangible Assets 1,216
4,298 Long Term Investments 5 7,484
12,732 Investment in Joint Venture 8,895
530 Long Term Debtors 357
1,681,698 Long Term Assets 1,781,675
2,693 Short Term Investments 5 7,817
875 Assets Held for Sale 565
747 Inventories 726
51,617 Short Term Debtors 6 49,572
31,259 Cash and Cash Equivalents 21,156
87,191 Current Assets 79,836
Cash and Cash Equivalents
(40,581) Short Term Borrowing (133,925)
(98,660) Short Term Creditors 7 (87,282)
(2,814) Provisions (1,391)
(142,055) Current Liabilities (222,598)
(1,951) Provisions (3,664)
(683,808) Long Term Borrowing (699,871)
(172,827) Other Long Term Liabilities (170,694)
(858,586) Long Term Liabilities (874,229)
768,248 NET ASSETS 764,684
110,636 Usable Reserves 108,534
619,061 Unusable Reserves 621,637
26,592 Group Reserves 22,135
11,959 Charitable and Common Good Reserves 12,378
768,248 TOTAL RESERVES 764,684
The accompanying notes form an integral part of these financial statements.
Scott Walker CPFA
Chief Finance Officer
Date:
GROUP BALANCE SHEET
The Unaudited Annual Accounts were issued on 29 June 2026.
103 | Perth and Kinross Annual Accounts 2025/26 Page 122 of 314

Page 123

2024/25 Notes 2025/26
£'000 £'000
(28,155) Deficit on the provision of services (41,181)
72,585
Adjustments to net surplus or deficit on the provision of services for non
cash movements 79,014
(43,242)
Adjustments for items included in the net surplus or deficit on the
provision of services that are investing and financing activities (24,813)
1,188 Net cash flows from Operating Activities 13,020
(86,402) Investing Activities 10 (124,417)
80,017 Financing Activities 11 101,294
(5,197) Net increase/(decrease) in cash and cash equivalents (10,103)
36,456 Cash and cash equivalents at the beginning of the reporting period 31,259
31,259 Cash and cash equivalents at the end of the reporting period 21,156
GROUP CASH FLOW STATEMENT
104 | Perth and Kinross Annual Accounts 2025/26 Page 123 of 314

Page 124

2024/25 2025/26
£'000 £'000
26,160 Deficit on the single entity Comprehensive Income and Expenditure Statement 42,572
for the year
Add:
(213) ● Managed Funds - Charitable Trusts and Common Good (302)
2,373 ● Joint Venture (1,687)
100 ● Associates 121
2,208 ● Subsidiaries (789)
30,628 Deficit for the year on the Group Comprehensive Income and Expenditure  Statement 39,915
RECONCILIATION OF THE SINGLE ENTITY DEFICIT FOR THE YEAR TO THE GROUP DEFICIT
105 | Perth and Kinross Annual Accounts 2025/26 Page 124 of 314

Page 125

106 | Perth and Kinross Council Annual Accounts 2025/26 
Notes to the Group Accounts
1. Combining Entities
The results of Tayside Valuation Joint Board which is jointly administered with Dundee City and Angus Councils have been
included in the Group Accounts.  The Council is exempt from including the Board as a subsidiary as the Scottish
Government exercises a dominant influence on the Board evidenced particularly by its ability to reconstitute or abolish
statutory bodies or otherwise influence their operating and financial policies.
A number of Councillors have voting rights on the Board.  The Council has an obligation to contribute to the Joint Board
losses or deficits and the ability to exercise significant influence over it.  The Joint Board has therefore been incorporated in
the Group Accounts under the equity method of Accounting for Associates.
For the purpose of consolidation and incorporation within the Group Accounts, recognition has been made of the Council’s
interest which is based on its share of the contributions made to the Tayside Valuation Joint Board, which in 2025/26 was
39.42% (2024/25 42.46%).  The accounting period for the Board is the year to 31 March 2026 and the Board Statements of
Accounts presents fairly its individual financial position. 
The individual accounts relating to Tayside Valuation Joint Board are published separately and can be obtained from the
Director of Corporate Services, Dundee City Council, Dundee House, 50 North Lindsay Street, Dundee, DD1 1QE.
In addition, the Council has also included Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth
and Kinross Ltd. as subsidiaries within its Group Accounts in accordance with IAS 27 Consolidated and Separate Financial
Statements, and in particular SIC 12 Consolidation – Special Purpose Entities.  These organisations deliver services on
behalf of the Council, and the Council therefore obtains benefit from their operations.  In addition, service delivery is
managed through Service Level Agreements specific to the service provision required from the organisations by the Council. 
Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth and Kinross Ltd. are governed by company
and charitable trust regulations.  For the purpose of consolidation and incorporation within the Group Accounts it has been
assumed that the Council’s interest in these organisations is 100% due to the nature of Council control and direction over
their operations.  
Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth and Kinross Ltd. are arm’s length companies
with sole member status with the Council being the sole member in each company. 
The individual accounts relating to these organisations are published separately, and can be obtained from the following
addresses:-
Live Active Leisure Ltd.    Caledonia House, Hay Street, Perth, PH1 5HS
Perth Theatre and Concert Hall Ltd.    Perth Concert Hall, Mill Street, Perth, PH1 5HZ
Culture Perth and Kinross Ltd.    A K Bell Library, 2-8 York Place, Perth, PH2 8EP
The income, expenditure, assets and liabilities of the Charitable Trusts which are administered and controlled by the Council
have also been included as a managed fund.  The nature of the assets of the managed fund are heritable property,
investments and debtors.  The assets are not the property of Perth and Kinross Council and are subject to charitable trust
regulations.  The Income and Expenditure Account of the Charitable Trusts is detailed on page 98 of the Annual Accounts.
The income, expenditure, assets and liabilities of the Common Good Accounts which are administered and controlled by the
Council have also been included as a managed fund.  The nature of the assets of the managed fund are heritable property,
investments and debtors.  The assets are the property of Perth and Kinross Council and are subject to the Accounting Code
of Practice.  The Income and Expenditure Account of the Common Good is detailed on page 99 of the Annual Accounts.
Perth and Kinross Council’s share of the assets and liabilities of Tayside Contracts Joint Committee, which is jointly
administered and controlled with Dundee City Council and Angus Council, has been included in the Group Accounts using
the equity method for an associate due to the Council having significant influence, rather than joint control over the entity. 
The Council’s investment in Tayside Contracts for 2025/26 is 41% (2024/25 41%).  Copies of Tayside Contracts Joint
Committee’s individual accounts are published separately, and can be obtained from Tayside Contracts, 1 Soutar Street,
Dundee, DD3 8SS. 
Perth and Kinross Integration Joint Board (IJB) is the statutory body established to integrate health and social care services
between the Council and NHS Tayside.  The IJB Board consists of eight voting members, four of whom are Perth and
Kinross councillors.  The Council can therefore exercise joint control over the arrangement and the IJB has been
consolidated into the Council Group accounts as a joint venture using the equity method and a percentage share of 50%. 
Copies of the Perth and Kinross Integration Joint Board individual accounts are published separately and can be obtained
from the Chief Financial Officer, Perth and Kinross Integration Joint Board, 2 High Street, Perth, PH1 5PH.
Tayside and Central Scotland Transport Partnership (TACTRAN) is a statutory body established under the Transport
(Scotland) Act 2005.  The partnership covers Angus, Dundee City, Perth and Kinross and Stirling Council areas.  The results
of TACTRAN have been excluded from Perth and Kinross Council’s Group accounts on the grounds of materiality.  
106 | Perth and Kinross Annual Accounts 2025/26 Page 125 of 314

Page 126

107 | Perth and Kinross Council Annual Accounts 2025/26 
2. Nature of Combination
The Council inherited its interest in the Tayside Valuation Joint Board following the reorganisation of local government in
1996.  It is considered that the Council’s interest was obtained on an acquisition basis.  However, as no consideration was
given, no goodwill requires to be accounted for.
3. Financial Impact of Consolidation and Going Concern
The effect of inclusion of the Subsidiaries and Associates listed above in the Group Balance Sheet is to increase both
reserves and net assets by £34.513 million (2024/25 £38.551 million increase). 
All Subsidiaries and the Associate have prepared their accounts on a ‘going concern’ basis.  The Council’s Group Accounts
have been prepared on a ‘going concern’ basis as there is no reason to suggest that future funding will not continue.  Apart
from the disclosures made in the Notes to the Group Accounts there were no material amounts or details in relation to
associates or managed funds.
4. Group Comprehensive Income and Expenditure Statement – Financing and Investment Income and Expenditure
2025/26 2024/25
£'000 £'000
Council Financing and Investment Income and Expenditure 24,041 19,430
Subsidiaries (229) (298)
Charitable Trusts (422) (170)
Common Good (111) (130)
Total Group CIES Financing and Investment Income and Expenditure 23,279 18,832
5. Group Balance Sheet – Investments
2025/26 2024/25
£'000 £'000
Council Investments 5,014 0
Charitable Trusts Investments 3,427 3,210
Common Good Investments 2,803 2,693
Subsidiaries 4,057 1,088
Total Group Investments 15,301 6,991
6. Group Balance Sheet – Short Term Debtors (net of provisions)
2025/26 2024/25
£'000 £'000
Net Debtors Balance - Note 28 to the Financial Statements 47,971 50,007
Subsidiary Debtors 1,571 1,562
Charitable Trust
Debtors 565 500
Inter-company elimination (562) (474)
Common Good
Debtors 174 190
Inter-company elimination (147) (168)
Total Group Debtors 49,572 51,617
107 | Perth and Kinross Annual Accounts 2025/26 Page 126 of 314

Page 127

108 | Perth and Kinross Council Annual Accounts 2025/26 
7. Group Balance Sheet – Short Term Creditors
2025/26 2024/25
£'000 £'000
Net Creditors Balance - Note 29 to the Financial Statements (84,063) (95,500)
Charitable Trust
Creditors (146) (9)
Inter-company elimination 147 474
Common Good
Creditors (19) (68)
Inter-company elimination 562 168
(83,519) (94,935)
Subsidiary Creditors (3,763) (3,725)
Total Group Creditors (87,282) (98,660)
8. Group Balance Sheet – Pension Liability
2025/26 2024/25
£'000 £'000
Net Pensions Liability at 31 March  - Note 18 to the Financial Statements (17,753) (18,533)
Subsidiaries (5) (7)
Group Pension Liability at 31 March (17,758) (18,540)
9. Group Cash Flow Statement
There has been no impact on the Group Cash Flow Statement from the inclusion of the Tayside Valuation Joint Board,
Tayside Contracts Joint Committee, or the Perth and Kinross Integration Joint Board.  Cash transactions between the Joint
Boards and the Council are already included within the Council’s Cash Flow Statement and there were no dividend
transactions. 
The impact of the inclusion of Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth and Kinross
Ltd. within the Group Cash Flow Statement is to increase the movement in the net cash position by £3.597 million (2024/25
increase of £6.614 million).  A cash increase of £1.683 million represents the Council’s 100% share of Live Active Leisure
Ltd., a cash increase of £1.057 million represents the Council’s 100% share of Perth Theatre and Concert Hall Ltd. and a
cash increase of £0.857 million represents the Council’s 100% share of Culture Perth and Kinross Ltd.  
10. Group Cash Flow – Investment Activities
2025/26 2024/25
£'000 £'000
Council Investing Activities (121,928) (91,070)
Subsidiaries (2,489) 4,668
(124,417) (86,402)
11. Group Cash Flow – Financing Activities
2025/26 2024/25
£'000 £'000
Council Financing Activities 101,469 79,998
Subsidiaries (175) 19
101,294 80,017
108 | Perth and Kinross Annual Accounts 2025/26 Page 127 of 314

Page 128

109 | Perth and Kinross Council Annual Accounts 2025/26 
Remuneration Report
1. Introduction
The Local Authority Accounts (Scotland) Amendment Regulations 2011 (SSI No. 2011/64) require local authorities in
Scotland to prepare a Remuneration Report as part of their annual statutory accounts.  The disclosures within this report
have been prepared in accordance with guidance issued by the Scottish Government on 13 May 2011 in Local
Government Finance Circular No 8/2011 (subsequently updated).  This guidance prescribes the content and format of
the information presented within the Remuneration Report and specifies that remuneration disclosures are to be based
upon taxable expenses and benefits.  The disclosures are set out in accordance with proper accounting practice as
prescribed by the Code of Practice on Local Authority Accounting in the UK and include prior year comparative figures.
2. Audit of Remuneration Report
The Remuneration Report is a statement in its own right rather than a note to the accounts and certain disclosures within
the report are subject to audit.
All information disclosed in Tables 1 to 7 in this Remuneration Report will be audited by the Council’s appointed auditor,
Audit Scotland.  The other sections of the Remuneration Report will be reviewed by Audit Scotland to ensure that they
are consistent with the financial statements.
3. Remuneration of Senior Councillors
3.1 The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004 (Remuneration) Regulations
2007 (SSI No. 2007/183).  The Regulations provide for the grading of Councillors for the purposes of remuneration
arrangements, as either, the Leader of the Council, the Civic Head (Provost), Senior Councillors or Councillors.  The
Leader of the Council and the Civic Head cannot be the same person for the purposes of payment of remuneration.  A
Senior Councillor is a Councillor who holds a significant position of responsibility in the Council’s political management
structure.
3.2 When determining the level of remuneration for Councillors, the Scottish Ministers considered the recommendations of
the former Scottish Local Authority Remuneration Committee (SLARC).  SLARC was an advisory Non-Departmental
Public Body set up in 2005 to advise Scottish Ministers on the remuneration, allowances and expenses incurred by local
authority councillors.  The Committee was stood down in February 2013 however reconvened in April 2023 to undertake
a one-off independent review of Councillor Remuneration to ensure terms and conditions continue to reflect the
responsibilities of a modern-day Councillor.  The recommendations in relation to pay and banding changes were
accepted by the Scottish Government and implemented from 1 April 2025.
3.3 The Regulations set out the salary that is to be paid to the Leader of the Council in accordance with bandings also set
out in the Regulations.  The Regulations also permit the Council to remunerate one Civic Head, which in the case of
Perth and Kinross Council is the Provost, and sets out the maximum salary that may be paid to that Civic Head.  For
2025/26 the maximum salary for the Leader of Perth and Kinross Council is £50,063 and the Council has agreed that the
Civic Head be paid 75% of the salary of the Leader, which for 2025/26 is a maximum of £37,548.  Please refer to Table
1.
3.4 In addition to the Leader of the Council and Civic Head, Regulations also set out the maximum number of senior
councillors the Council may have; the maximum yearly amount that may be paid to a senior councillor (75% of the total
yearly amount payable to the Leader of the Council) and the maximum yearly amount payable by the Council for all
senior councillors.  Perth and Kinross Council may have a maximum of 14 senior councillors with a maximum salary of
£37,548 and a maximum yearly amount payable for all senior councillors of £444,710 in 2025/26 (excluding the Council
Leader, Civic Head, Conveners and Vice Conveners of Joint Boards).  The Council is able to exercise local flexibility in
the determination of the precise number of senior councillors and their salary within these maximum limits.
3.5 The Regulations also set out the remuneration payable to councillors with the responsibility of a Convener or a Vice-
Convener of a Joint Board such as Tayside Valuation Joint Board.  The Regulations require the remuneration to be paid
by the Council of which the Convener or Vice-Convener is a member.  Joint Board Conveners and Vice-Conveners are
considered to be senior councillors for remuneration disclosure purposes.  In financial year 2025/26, one councillor from
Perth and Kinross Council served as Convener or Vice-Convener of a Joint Board.
3.6 During 2025/26 Perth and Kinross Council had 13 Senior Councillors and a Vice-Convener of a Joint Board.  Details are
provided in Table 1.  Together with the Leader of the Council and the Provost, the total remuneration including taxable
expenses paid to these Councillors was £541,040.  The individual amounts payable to the Leader of the Council, the
Provost, Senior Councillors of Perth and Kinross Council and the Vice-Convener of a Joint Board in 2025/26 are set out
in Table 1.  The Regulations also permit the Council to pay contributions or other payments as required to the Local
Government Pension Scheme in respect of those Councillors who elect to become councillor members of the pension
scheme. 
109 | Perth and Kinross Annual Accounts 2025/26 Page 128 of 314

Page 129

110 | Perth and Kinross Council Annual Accounts 2025/26 
Table 1: Remuneration of Senior Councillors, Conveners and Vice-Conveners of Joint Boards for Financial Year
2025/26 
Name and Post Title  Salary, Fees
and Allowances
2025/26
£
Total
Remuneration
2025/26
£
Total
Remuneration
2024/25
£
Eric Drysdale
Council Leader (from 25/09/2025)
Depute Leader (until 24/09/2025) 
(Note 2)
42,511 42,511 29,448
Xander McDade
Provost (Civic Head) 37,548 37,548 32,024
Peter Barrett
Convener Licensing Board 
(Note 3)
34,190 34,190 26,176
Bob Brawn
Convener Local Review Body 
(Note 3)
34,190 34,190 26,176
Dave Cuthbert
Vice-Convener Tayside Valuation Joint Board and
Vice-Convener Tayside Contracts Joint Committee
(Note 4)
28,926 28,926 25,352
Stewart Donaldson
Convener Finance and Resources Committee 34,528 34,528 29,448
John Duff
Leader of Largest Opposition Party 34,528 34,528 29,448
David Illingworth
Convener Audit and Risk Committee 34,528 34,528 29,448
Grant Laing
Convener Economy and Infrastructure Committee
(from 25/02/2026)
Council Leader (until 22/09/2025)
(Note 5)
26,073 26,073 42,698
Ian Massie
Convener Planning and Placemaking Committee 34,528 34,528 29,448
Tom McEwan
Convener Housing and Social Wellbeing Committee 34,528 34,528 29,448
Andrew Parrott
Depute Provost 30,689 30,689 26,176
John Rebbeck
Convener Learning and Families Committee 34,528 34,528 29,448
Colin Stewart
Convener Scrutiny and Performance Committee 34,528 34,528 29,448
Richard Watters
Convener Climate Change and Sustainability
Committee
34,528 34,528 29,448
Michael Williamson
Convener Licensing Committee 30,689 30,689 26,176
TOTAL 541,040 541,040 469,810 
Notes:
(1) After adjusting for the salaries of the Leader of the Council, the Civic Head (Provost) and the Vice-Convener of
Tayside Valuation Joint Board and Tayside Contracts Joint Committee, the total salaries paid to Senior Councillors
in 2025/26 was £425,800 which compares with the maximum under Regulations of £444,710.
(2) Appointed to Council Leader from 25/09/2025 (FTE Allowance £50,063).  Allowance from 01/04/2025 to 24/09/2025
was £34,528.
(3) Increase in Senior Allowance from £30,689 to £34,528 from 8 May 2025 following Council decision on 7 May 2025.
(4) Increase in Allowance from £26,797 to £30,689 from 11 September 2025 following Council decision on 10
September 2025.
(5) Councillor Laing held the position of Council Leader until 22/09/2025 (FTE Allowance £50,063) and was
subsequently appointed as a Senior Councillor from 25/02/2026 (FTE Allowance £34,528).  The remuneration
disclosed above relates solely to the periods 01/04/2025 to 22/09/2025 and 25/02/2026 to 31/03/2026, when senior
responsibilities were held.  For the intervening period, Councillor Laing received basic councillor remuneration,
which is disclosed in the Councillors’ Remuneration Report.
110 | Perth and Kinross Annual Accounts 2025/26 Page 129 of 314

Page 130

111 | Perth and Kinross Council Annual Accounts 2025/26 
3.7 The arrangements for political decision-making structures within Perth and Kinross Council as at 31 March 2026, which
encompassed the salaries of all elected members including the Council Leader, Civic Head and Senior Councillors, were
agreed at the meeting of the Council on 25 May 2022 (Report No. 22/110 refers) and are available on the Council’s
website. 
3.8 The Council paid the following salaries and expenses to all Councillors (including those listed in Table 1 above) in
financial year 2025/26: 
Table 2: Remuneration Paid to Councillors 1 April 2025 to 31 March 2026 
2025/26 2024/25
Type of Remuneration £ £
Salaries 1,175,790 974,424
Allowances & Expenses 27,743 32,253
Total 1,203,533 1,006,677
3.9 The annual return of Councillors’ salaries and expenses for 2025/26 is available for any member of the public to view at
Culture Perth and Kinross Ltd. libraries and Council local area offices during normal working hours and is also available
on the Council’s website at Councillors Expenses.
4. Remuneration of Senior Employees
4.1 The Council is required to publish the remuneration of senior employees as defined by the disclosure regulations.  Senior
employees are defined with reference to their management authority; to the political restriction placed upon their post
under section 2(1) (a), (b) or (c) of the Local Government Housing Act 1989 and with reference to their reporting
relationship to the Council’s ‘Head of Paid Service’ or Chief Executive.  The disclosure requirements also include any
employee whose annual remuneration is £150,000 or more.  One employee of Perth and Kinross Council was
remunerated at this level in 2025/26 (Chief Executive).
4.2 The application of the disclosure regulations in relation to the management structure of Perth and Kinross Council
defines the following post-holders as senior employees in 2025/26:
• The Chief Executive as statutory head of paid service.
• The Strategic Lead of Education and Learning as the Council’s chief education officer, the Strategic Lead of Legal
and Governance Services as the Council’s statutory monitoring officer; the Strategic Lead of Finance and Business
Support as the Council’s proper officer for financial administration and the Council’s statutory chief social work
officer.
• The following officers are directly accountable to the Council’s head of paid service and/or are directly accountable
to the Council or any committee or sub-committee:
o Depute Chief Executive
o Director/Chief Officer of the Perth and Kinross Health and Social Care Partnership
o Strategic Lead - Education and Learning and Chief Education Officer 
o Strategic Lead – Children, Families and Justice
o Strategic Lead - Finance and Business Support and Chief Finance Officer
o Strategic Lead – Legal and Governance and Statutory Monitoring Officer
o Strategic Lead – Strategic Planning, People and Performance 
o Strategic Lead – Projects and Programmes 
o Strategic Lead – Economy, Development and Planning
o Strategic Lead – Environment and Infrastructure
o Strategic Lead – Customer and Digital Services 
o Strategic Lead – Housing and Communities 
o Strategic Lead – Property Services
o Head of Integrated Health and Care - Adults
o Head of Integrated Health and Care – Older People
o Chief Finance Officer and Head of Governance/Performance, Health and Social Care
111 | Perth and Kinross Annual Accounts 2025/26 Page 130 of 314

Page 131

112 | Perth and Kinross Council Annual Accounts 2025/26 
4.3 The Scottish Joint Negotiating Committee (SJNC) for Local Authority Services sets the salaries for the Chief Executives of
Scottish local authorities.   
4.4 The remuneration of senior employees of Perth and Kinross Council for 2025/26 is detailed in Table 3 below:
Table 3: Remuneration of Senior Employees of the Council for Financial Year 2025/26
(Job titles as at 31 March 2026)
Name and Post Title     Salary, Fees
and Allowances
2025/26 
£
Termination
Payments
2025/26 
£
Total
Remuneration
2025/26 
£
Total
Remuneration
2024/25
(Note 4)
£
Thomas Glen
Chief Executive (Note 1) 171,287 n/a 171,287 163,305
Clare Mailer
Depute Chief Executive 146,043 n/a 146,043 141,133
Jacqueline Pepper
Director/Chief Officer of the Health and
Social Care Partnership
146,012 n/a 146,012 140,396
David Macluskey
Strategic Lead – Education and Learning 113,656 n/a 113,656 24,154
Arun Singh
Strategic Lead – Children, Families and
Justice 
113,656 n/a 113,656 109,285
Scott Walker
Strategic Lead – Finance and Business
Support
113,690 n/a 113,690 110,477
Lisa Simpson
Strategic Lead – Legal and Governance 113,656 n/a 113,656 110,132
Greg Boland
Strategic Lead – Strategic Planning,
People and Performance
106,735 n/a 106,735 102,630
Charlene Guild
Strategic Lead – Projects and Programmes 106,735 n/a 106,735 93,721
Serge Merone
Strategic Lead – Economy, Development
and Planning
113,656 n/a 113,656 26,133
Fraser Crofts
Strategic Lead – Environment and
Infrastructure
106,735 n/a 106,735 102,630
Stephen Crawford
Strategic Lead – Property Services (up to
10/10/25)
(Note 2)
56,473 533 57,006 102,968
John Beveridge
Strategic Lead – Property Services (from
06/10/2025)
(Note 3)
52,207 n/a 52,207 n/a
Alan Taylor
Strategic Lead – Customer and Digital
Services
106,747 n/a 106,747 103,071
Elaine Ritchie
Strategic Lead – Housing and
Communities
106,735 n/a 106,735 102,630
Jane Menzies
Head of Integrated Health and Care –
Adults 
106,735 n/a 106,735 47,906
Zoe Robertson
Head of Integrated Health and Care –
Older People 
106,735 n/a 106,735 98,967
Donna Mitchell 
Chief Finance Officer and Head of
Governance/Performance, Health and
Social Care
106,735 n/a 106,735 102,630
TOTAL 1,994,228 533 1,994,761 1,682,168
(see notes) 
112 | Perth and Kinross Annual Accounts 2025/26 Page 131 of 314

Page 132

113 | Perth and Kinross Council Annual Accounts 2025/26 
Notes:
(1) The substantive salary for the Chief Executive is laid down in COSLA Circular CO-155 and IR 11-25. 
(2) The substantive salary for Strategic Lead – Property Services is £106,735.  Postholder retired 10/10/2025. 
Termination payment relates to Pay In Lieu of Holidays.
(3) The substantive salary for Strategic Lead – Property Services is £106,735.  Postholder appointed on 06/10/2025.
(4) Total Remuneration for 2024/25 was £1,996,636.  The reduction of £314,468 relates to leavers Devlin, Littlejohn,
Scott and Williams, who ceased employment during that year and are therefore not included in the 2025/26
disclosure. 
4.5 Election fees (where applicable) are included with senior employee salaries.  No other taxable benefits or bonuses were
received by the above-named senior employees of Perth and Kinross Council in 2025/26.
4.6 The remuneration paid to the Chief Executive of each of the Council’s subsidiary bodies for 2025/26 is detailed in Table
3A below:
Table 3A: Remuneration of Council’s Subsidiary Bodies Senior Employees for Financial Year 2025/26
5. General Disclosure of Remuneration by Pay Band 
5.1 In accordance with the disclosure regulations, Table 4 below details the number of Perth and Kinross Council employees
(including teachers) whose annual remuneration in 2025/26 was £50,000 or more, including senior employees subject to
individual disclosure in section 4 of this report.  The information is presented, as required, in bandings of £5,000.
Table 4: Remuneration of Employees by Pay Band for 2025/26
Remuneration Bands  Number of Employees     
2025/26  2024/25
£50,000-£54,999  613  212
£55,000-£59,999  199  195
£60,000-£64,999  144  139
£65,000-£69,999  78  78
£70,000-£74,999  63  52
£75,000-£79,999  41  17
£80,000-£84,999  25  18
£85,000-£89,999  5  5
£90,000-£94,999  2  3
£95,000-£99,999  1  4
£100,000-£104,999  3  7
£105,000-£109,999  12  6
£110,000-£114,999  5  0
£115,000-£119,999  0  0
£120,000-£124,999  0  0
£125,000-£129,999  0  0
£130,000-£134,999  0  0
£135,000-£139,999  0  1
£140,000-£144,999  0  2
£145,000-£149,999  2  0
£150,000-£154,999  0  0
£155,000-£159,999  0  0
£160,000-£164,999  0  1
£165,000-£169,999  0  0
£170,000-£174,999  1  0     
Total  1,194  740 
Name and Post Title
Salary, Fees
and Allowances
2025/26
£
Total
Remuneration
2025/26
£
Total
Remuneration
2024/25
£
Paul Cromwell
Live Active Leisure – Chief Executive 92,120 92,120 89,437
Helen Smout
Culture Perth and Kinross Limited – Chief Executive 76,602 76,602 73,730
Christopher Glasgow
Perth Theatre and Concert Hall Limited – Chief
Executive
72,842 72,842 73,281
TOTAL 241,564 241,564 236,448
113 | Perth and Kinross Annual Accounts 2025/26 Page 132 of 314

Page 133

114 | Perth and Kinross Council Annual Accounts 2025/26 
Notes:
For 2025/26, the £50,000 - £54,999, £55,000 - £59,999 and £60,000 - £64,999 pay bands include 508, 76 and 115
teaching staff respectively. 
For 2025/26 1,194 employees fell into the bandings above; 872 were teaching staff.  For context, the top of the main
grade teacher scale is £52,614 effective from 1 August 2025.
Table 5: The number of Exit Packages with Total Cost per band and Total Cost of Compulsory and Other
Redundancies
(a)
Exit package cost
band (including
special payments)
(b)
Number of
compulsory
redundancies
(c)
Number of other
departures agreed
(d)
Total number of exit
packages by cost
band (b) + (c)
(e)
Total cost of exit
packages in each
band
2025/26 2024/25 2025/26 2024/25 2025/26 2024/25 2025/26
£’000
2024/25
£’000
£0 - £20,000 2 2 4 6 6 8 28 39
£20,001 - £40,000 1 0 0 3 1 3 34 73
£40,001 - £60,000 0 1 1 4 1 5 44 239
£60,001 - £80,000 0 0 1 1 1 1 66 75
£80,001 - £100,000 0 0 0 2 0 2 0 175
Over £100,000 0 0 0 0 0 0 0 0
Total 3 3 6 16 9 19 172 601 
5.2 The costs included within Table 5 are all non-recurring and include payments to individual officers and to the relevant
Pension Fund.  
5.3 All of the individual exit packages included within Table 5 have been subject to a full business case or legal agreement
where appropriate outlining the implications for the Council or are related to officers who have temporary contracts, and
their contract has ceased but they are entitled to a redundancy payment due to their length of employment.  In terms of
the financial assessment for each business case, the maximum payback period is up to five years.  The departure of
individuals has delivered significant recurring savings to the Council in the past and also facilitated the delivery of an
ambitious and challenging transformation / modernisation programme. 
6. Remuneration by Subsidiary Bodies of Perth and Kinross Council
6.1 Councillors and senior employees of Perth and Kinross Council serve as board members, officials and technical advisors
to subsidiary bodies of the Council.  In 2025/26, the Strategic Lead of Legal and Governance and Strategic Lead of
Finance and Business Support served as a proper officers to the Tayside and Central Scotland Transport Partnership
(TACTRAN).  No remuneration was paid to councillors or senior employees of Perth and Kinross Council by subsidiary
bodies of the Council in 2025/26.
7. Disclosure of Pension Benefits
7.1 The disclosure regulations require the separate disclosure of accrued pension benefits for senior councillors and senior
employees of Perth and Kinross Council.  Pension Benefits for councillors and local government employees are provided
through the Local Government Pension Scheme (LGPS).  Councillors have only been eligible to join this scheme since
May 2007.
7.2 Councillor’s pension benefits are based on career average pay.  The councillor’s pay for each year or part year ending 31
March (other than the pay in the final year commencing 1 April) is increased by the increase in the cost of living as
measured by the appropriate index between the end of that year and the last day of the month in which their membership
of the scheme ends.  The total of the revalued pay is then divided by the period of membership to calculate the career
average pay.  This is the value used to calculate the pension benefits.
7.3 From 1 April 2015 a career average scheme was implemented for local government employees.  This means that
pension is built up based on the pensionable pay for each year.  The benefit is added to the employee’s pension account
plus inflation increases.  The scheme’s normal retirement age for both councillors and employees will vary dependant on
age and length of pensionable service.
7.4 From 1 April 2009 a tiered contribution scheme was introduced with contributions from scheme members being based on
how much pay falls into each tier.  Prior to 2009 contribution rates were set at 6% for all non-manual employees.  
114 | Perth and Kinross Annual Accounts 2025/26 Page 133 of 314

Page 134

115 | Perth and Kinross Council Annual Accounts 2025/26 
Tiered Pension Contribution Rates for Local Government Pension Scheme Members in 2025/26 
Actual Pensionable pay Contribution Rate
2025/26
On earnings up to and including £27,500 5.5%
On earnings above £27,501 and up to £33,600 7.25%
On earnings above £33,601 and up to £46,100 8.5%
On earnings above £46,101 and up to £61,400 9.5%
On earnings of £61,401 and above  12% 
7.5 Pensionable Pay includes salary, plus any contractual elements of pay such as shift payment, night working payment,
standby and the monetary value of any accommodation or other allowances in kind pertaining to employment.
7.6 Under the scheme there is no automatic entitlement to a lump sum.  Members may opt to give up (commute) pension for
lump sum up to the limit set by the Finance Act 2004.  The pension is built up based on pensionable pay in the year with
an accrual rate of 1/49th added to the pension account. (Prior to 2015 the accrual rate was 1/60th of final pensionable
salary and years of pensionable service.  Prior to 2009 the accrual rate guaranteed a pension based on 1/80th and a
lump sum based on 3/80th of final pensionable salary and years of pensionable service).
7.7 The value of accrued benefits has been calculated on the basis of the age at which the person will first become entitled
to receive a pension on their retirement without reduction on account of its payment at that age; without exercising any
option to commute pension entitlement into a lump sum; and without any adjustment for the effects of future inflation. 
The pension figures shown relate to the benefits that the person has accrued as a consequence of their local
government service, and not just their current appointment.
7.8 Pension Entitlements of Senior Councillors
The pension entitlements of senior councillors of Perth and Kinross Council for the year to 31 March 2026 are shown in
Table 6 below, together with the contribution made by the Council to each senior councillor’s pension during the year.
Table 6: Pension Entitlements of Senior Councillors for Financial Year 2025/26   
Name and Post Title  
In-year pension
contributions 
(Note 1)
Accrued Pension Benefits 
(Note 2)
2025/26 
£
2024/25 
£
as at
31/03/2026
£’000
as at
31/03/2025
£’000
Difference 
£’000
Eric Drysdale
Council Leader (from 25/09/2025)
Depute Leader (up to 24/09/2025)
6,674 4,623 Pension
Lump Sum
6
0
5
0
1
0
Xander McDade
Provost (Civic Head) 5,895 5,028 Pension
Lump Sum
5
0
4
0
1
0
Peter Barrett
Convener Licensing Board  5,368 4,110 Pension
Lump Sum
10
2
9
2
1
0
Bob Brawn
Convener Local Review Board   5,368 4,110 Pension
Lump Sum
6
0
5
0
1
0
Dave Cuthbert
Vice-Convener Tayside Valuation
Joint Board and Vice-Convener
Tayside Contracts Joint Committee
4,541 3,980 Pension
Lump Sum
5
0
2
0
3
0
Stewart Donaldson
Convener Finance and Resources
Committee
5,421 4,623 Pension
Lump Sum
7
0
5
0
2
0
John Duff
Leader of Largest Opposition Party 5,421 4,623 Pension
Lump Sum
5
0
4
0
1
0
David Illingworth
Convener Audit and Risk
Committee
5,421 4,623 Pension
Lump Sum
5
0
4
0
1
0
Grant Laing
Convener Economy and
Infrastructure Committee (from
25/02/2026)
Council Leader (to 22/09/25)
5,849 6,704 Pension
Lump Sum
9
0
8
0
1
0
Ian Massie
Convener Planning and
Placemaking Committee
5,421 4,623 Pension
Lump Sum
3
0
2
0
1
0
Tom McEwan
Convener Housing and Social
Wellbeing Committee
5,421 4,623 Pension
Lump Sum
5
0
4
0
1
0
115 | Perth and Kinross Annual Accounts 2025/26 Page 134 of 314

Page 135

116 | Perth and Kinross Council Annual Accounts 2025/26 
Name and Post Title  
In-year pension
contributions 
(Note 1)
Accrued Pension Benefits 
(Note 2)
2025/26 
£
2024/25 
£
as at
31/03/2026
£’000
as at
31/03/2025
£’000
Difference 
£’000
Andrew Parrott
Depute Provost 4,818 4,110 Pension
Lump Sum
6
0
5
0
1
0
John Rebbeck
Convener Learning and Families
Committee
5,421 4,623 Pension
Lump Sum
5
0
4
0
1
0
Colin Stewart
Convener Scrutiny and
Performance Committee
5,421 4,623 Pension
Lump Sum
5
0
4
0
1
0
Richard Watters
Convener Climate Change and
Sustainability Committee
5,421 4,623 Pension
Lump Sum
5
0
4
0
1
0
Michael Williamson
Convener Licensing Committee 4,818 4,110 Pension
Lump Sum
7
0
6
0
1
0
TOTAL 86,699 73,759 
Notes:
(1) The in-year employer pension contributions shown are based on all pensionable earnings for financial year
2025/26, not just current appointments.
(2) The pension benefits shown relate to the benefits that the individual has accrued as a consequence of their total
local government service, including any service with a Council subsidiary body, and not just their current
appointment.  Councillors have only been eligible to join the Local Government Pension Scheme since May 2007.
7.9 The pension entitlements of senior employees of Perth and Kinross for the year to 31 March 2026 are shown in Table 7
below, together with the contribution made by the Council to each senior employee’s pension during the year. 
Table 7: Pension Entitlements of Senior Employees of the Council for Financial Year 2025/26
(Post titles as at 31 March 2026) 
Name and Post Title  
In-year pension
contributions 
(Note 1)
Accrued Pension Benefits
(Note 2) 
2025/26 
£
2024/25 
£  
as at
31/03/2026
£’000 
as at
31/03/2025
£’000
Difference 
£’000
Thomas Glen
Chief Executive 26,892  25,639  Pension
Lump Sum
92
0
84
0
8
0
Clare Mailer
Depute Chief Executive 22,924  22,043  Pension
Lump Sum
66
78
61
75
5
3
Jacqueline Pepper
Director/Chief Officer, Perth
and Kinross Health and
Social Care Partnership
22,924  22,042  Pension
Lump Sum
65
38
60
37
5
1
David Macluskey
Strategic Lead – Education
and Learning 
17,773  13,592  Pension
Lump Sum
10
0
7
0
3
0
Arun Singh
Strategic Lead – Children,
Families and Justice 
17,840  17,158  Pension
Lump Sum
5
0
3
0
2
0
Scott Walker
Strategic Lead – Finance
and Business Support
17,844  17,159  Pension
Lump Sum
55
71
51
69
4
2
Lisa Simpson
Strategic Lead – Legal and
Governance
17,844  17,161  Pension
Lump Sum
26
0
23
0
3
0
Greg Boland
Strategic Lead – Strategic
Planning, People and
Performance
16,757  16,113  Pension
Lump Sum
53
63
49
61
4
2
116 | Perth and Kinross Annual Accounts 2025/26 Page 135 of 314

Page 136

117 | Perth and Kinross Council Annual Accounts 2025/26 
Name and Post Title  
In-year pension
contributions 
(Note 1)
Accrued Pension Benefits
(Note 2) 
2025/26 
£
2024/25 
£  
as at
31/03/2026
£’000 
as at
31/03/2025
£’000
Difference 
£’000
Charlene Guild
Strategic Lead – Projects
and Programmes
16,757  14,714  Pension
Lump Sum
39
27
36
26
3
1
Serge Merone
Strategic Lead – Economy,
Development and Planning
17,844  12,159  Pension
Lump Sum
44
49
33
33
11
16
Fraser Crofts
Strategic Lead –
Environment and
Infrastructure
16,757  16,113  Pension
Lump Sum
51
54
47
52
4
2
Stephen Crawford
Strategic Lead – Property
Services (up to 10/10/2025)
8,864  16,113  Pension
Lump Sum
47
41
45
40
2
1
John Beveridge
Strategic Lead - Property
Services (from 06/10/2025)
13,388 n/a Pension
Lump Sum
47
66
n/a
n/a
n/a
n/a
Alan Taylor
Strategic Lead – Customer
and Digital Services
16,757  16,113  Pension
Lump Sum
55
60
51
57
4
3
Elaine Ritchie
Strategic Lead – Housing
and Communities
16,757  16,113  Pension
Lump Sum
39
27
35
26
4
1
Jane Menzies
Head of Integrated Health
and Care – Adults
16,757  7,805  Pension
Lump Sum
3
0
1
0
2
0
Zoe Robertson
Head of Integrated Health
and Care – Older People
16,757  15,538  Pension
Lump Sum
17
0
15
0
2
0
Donna Mitchell 
Chief Finance Officer and
Head of
Governance/Performance,
Health and Social Care
16,701 16,061 Pension
Lump Sum
29
14
26
13
3
1
TOTAL 318,137 281,636 
Notes:
(1) The in-year employer pension contributions shown are based on all pensionable earnings for financial year
2025/26, not just the current appointment.
(2) Accrued pension benefits include total benefits accumulated during all membership of the Local Government
Pension Scheme and not just service in their current role.
7.10 Pension Entitlements – Council’s Subsidiary Bodies
The pension entitlements of the Chief Executives of each of the Council’s subsidiary bodies for the year to 31 March
2026 are shown in Table 7A below, together with the contribution made to each Senior Employees’ pension during the
year.  
117 | Perth and Kinross Annual Accounts 2025/26 Page 136 of 314

Page 137

118 | Perth and Kinross Council Annual Accounts 2025/26 
Table 7A: Pension Entitlements of Senior Employees of each of the Council’s Subsidiary Bodies for Financial
Year 2025/26 
Name and Post Title  
In-year pension
contributions 
(Note 1)
Accrued Pension Benefits
(Note 2)
2025/26 
£
2024/25 
£  
as at
31/03/2026
£’000 
as at
31/03/2025
£’000
Difference 
£’000
Paul Cromwell
Live Active Leisure – Chief Executive 14,463 14,042 Pension
Lump Sum
33
14
31
13
2
1
Helen Smout
Culture Perth and Kinross Limited -
Chief Executive
12,027 11,577 Pension
Lump Sum
34
27
32
26
2
1
Christopher Glasgow
Perth Theatre and Concert Hall
Limited – Chief Executive
11,436 11,103 Pension
Lump Sum
6
0
4
0
2
0
TOTAL 37,926 36,722 
Notes:
(1) The in-year employer pension contributions shown are based on all pensionable earnings for financial year
2025/26, not just the current appointment.
(2) Accrued pension benefits include total benefits accumulated during all membership of the Local Government
Pension Scheme and not just service in their current role.
8. Trade Union (Facility Time Publication Requirements) Regulations 2017
8.1 The Trade Union (Facility Time Publication Requirements) Regulations 2017 were repealed with effect from 18 February
2026.  As a result, Perth and Kinross Council is no longer required to publish facility time information for the 2025/26
reporting period.  The Council however has chosen to publish this information for transparency.
The return for 2025/26 is available via the following link: Trade Unions Statutory Return 2025/26. 
Signed: 
Thomas Glen  Councillor Eric Drysdale
Chief Executive  Leader of the Council
Perth and Kinross Council
Date: 
Perth and Kinross Council
Date: 
118 | Perth and Kinross Annual Accounts 2025/26 Page 137 of 314

Page 138

119 | Perth and Kinross Council Annual Accounts 2025/26 
Glossary
ACCOUNTING PERIOD
The period of time covered by the accounts, normally a period of twelve months commencing on 1 April.  The end of the
accounting period is the Balance Sheet date.
ACCRUALS
Sums included in the final accounts to recognise revenue and capital income and expenditure earned or incurred in the financial
year, but for which actual payment had not been received or made as at 31 March.  
BEACON METHOD (ADJUSTED VACANT POSSESSION METHOD)
Based on the (vacant possession) market value of the asset which is the adjusted to reflect the assets’ use for social housing
with a sitting tenant.
CAA
Capital Adjustment Account
CAPITAL EXPENDITURE
Expenditure on the acquisition of a fixed asset, which will be used in providing services beyond the current accounting period, or
expenditure which adds to and not merely maintains the value of an existing fixed asset.  
CAPITAL FINANCING
Funds raised to pay for capital expenditure.  There are various methods of financing capital expenditure including borrowing. 
Leasing, direct revenue financing, usable capital receipts, capital grants, capital contributions, revenue reserves and earmarked
reserves.  
CAPITAL RECEIPT
The proceeds from the disposal of land or other fixed assets.  Proportions of capital receipts can be used to finance new capital
expenditure, within rules set down by the Government but they cannot be used to finance revenue expenditure.  
CONTINGENT LIABILITY
A contingent liability is either:
• A possible obligation arising from past events whose existence will be confirmed only by the occurrence of one or
more uncertain future events not wholly within the Council’s control; or
• A present obligation arising from past events where it is not probable that a transfer of economic benefits will be
required, or the amount of the obligation cannot be measured with sufficient reliability.  
CORPORATE and DEMOCRATIC CORE
The corporate and democratic core comprises all the activities that local authorities engage in specifically because they are
elected, multi-purpose authorities.  The cost of these activities are thus over and above those which would be incurred by a
series of independent single purpose, nominated bodies managing the same services.  There is therefore no logical basis for
apportioning these costs to services.  
CREDITOR
Amount owed by the Council for work done, goods received or services rendered within the accounting period, but for which
payment has not been made by the Council by the end of that accounting period.  
CRR
Capital Receipts Reserve
CURRENT VALUE
The measurement of operational assets used for the delivery of Council services.  Property, plant and equipment is measured
on the basis of service potential using existing use value for assets where an active market exists, existing use value-social
housing for operational Council dwellings or depreciated replacement cost for assets where there is no market and/or the asset
is specialised.
DBFM
Design Build Finance Maintain - A Non-Profit Distribution (NPD) model to Design, Build, Finance, and Maintain infrastructure
which requires the private sector to take a fixed rate of return.  The DBFM agreement provides the Council with the right to
receive services in return for an annual payment (unitary charge) which comprises the costs of construction, finance, and
maintenance, and for the provision of any agreed additional services, for the duration of the agreement.
DEBTOR
Amount owed to the Council for works done, goods received or services rendered within the accounting period, but for which
payment has not been received by the Council by the end of that period.    
119 | Perth and Kinross Annual Accounts 2025/26 Page 138 of 314

Page 139

120 | Perth and Kinross Council Annual Accounts 2025/26 
EXISTING USE VALUE FOR SOCIAL HOUSING (EUV-SH)
Is the estimated amount for which a property should exchange on the date of valuation, between a willing buyer and a willing
seller in an arm’s length transaction.
FAIR VALUE
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between
market participants at the measurement date.
FIAA
Financial Instruments Adjustment Account
IMPAIRMENT
A reduction in the value of a fixed asset to below its carrying amount on the Balance Sheet.
MATERIALITY
The concept that the Annual Accounts should include all amounts which, if omitted, or mis-stated, could be expected to lead to a
distortion of the financial statements and ultimately mislead a user of the accounts.  
NET BOOK VALUE
The amount at which fixed assets are included in the Balance Sheet. i.e. their historical costs or current value less the
cumulative amounts provided for depreciation.  
NON-DISTRIBUTED COSTS
These are overheads which cannot be directly allocated to a specific area of activity and as such are not apportioned to
services.  
PPE
Property, Plant and Equipment
PRIOR YEAR ADJUSTMENT
Material adjustments applicable to previous years arising from changes in accounting policies or from the correction of
fundamental errors.  This does not include normal recurring corrections or adjustments of accounting estimates made in prior
years.  
PROVISION
An amount put aside in the accounts for future liabilities or losses which are certain or very likely to occur but the amounts or
dates of when they will arise are uncertain.  
PUBLIC WORKS LOAN BOARD (PWLB)
An agency of HM Treasury, which provides loans mainly for capital purposes of one year or more to authorities at interest rates
of up to 2% above those at which the UK Government can itself borrow at.
REVENUE EXPENDITURE
The day-to-day expenses of providing services.  
SERVICE CONCESSION ARRANGEMENTS
Service concession (PPP and PFI) arrangements involve the operator undertaking an obligation to provide assets (and related
services) that are used to provide services to the public (irrespective of who provides those services to the public).
120 | Perth and Kinross Annual Accounts 2025/26 Page 139 of 314

Page 140

Page 140 of 314

Page 141

Best Value thematic work: Perth and Kinross Council | 1 
Best Value thematic work – Asset
management
Perth and Kinross
Council
How well councils are managing assets to achieve
their corporate objectives and respond to challenges
around financial sustainability and climate change
DRAFT 
Prepared by Audit Scotland
June 2026
6
Page 141 of 314

Page 142

Contents 
Contents 2
Key messages 3
Introduction 4
1. Asset management planning 6
2. Governance and performance 15
3. Partnership working and community engagement 19
Appendix 25 
Accessibility
You can find out more and read this report using assistive technology on
our website
Page 142 of 314

Page 143

Key messages | 3 
Key messages 
1 Perth and Kinross council has an up-to-date Corporate Asset Management
Framework that aligns with the council’s corporate objectives and a long-term
(30 year) capital plan in place. The council has clear asset management
plans in place, but these do not always include sufficient detail about how
progress will be monitored and reported. The council’s asset challenge
process provides a good model to inform decision making. Data to fully
implement this process for property assets is lacking, limiting its
effectiveness.
2 The council has effective governance arrangements in place for its capital
programme, including regular reporting on its capital budget which enables
elected member oversight and scrutiny. Performance monitoring and
reporting on asset management strategies and plans could be improved by
including timescales, targets and asset related key performance indicators.
This would provide a coherent, comprehensive view of progress.
3 The council has an established approach to annual reporting on the condition,
suitability and utilisation of each type of asset through its status reports to the
Corporate Investment Group. This provides the group with a clear
understanding of the council’s asset portfolio to support decision making. 
4 The council’s performance against Local Government Benchmarking
Framework (LGBF) indicators is mixed. In 2024/25, the council performed
better than its family group and nationally in the two relevant asset LGBF
indicators for operational property. The council’s performance in the
proportion of council dwellings meeting the Scottish Housing Quality
standards is yet to meet pre-Covid-19 pandemic levels. 
5 The council has a clear ambition to work collaboratively with partners and has
good examples of managing assets with other organisations. The council also
has robust and transparent arrangements in place for Community Asset
Transfers. Whilst there are good examples of community engagement in
practice, there is limited evidence that the council has used the community’s
views in developing its strategic priorities for asset management.
Page 143 of 314

Page 144

Introduction | 4 
Introduction 
1.  Asset management directly impacts how councils provide services and
achieve their own corporate priorities and longer-term financial
sustainability. Limited capital budgets make it challenging for councils to
maintain their existing assets and estates, invest in new assets and
achieve net zero targets. Exhibit 1 sets out some principles for effective
asset management, informed by CIPFA guidance and the Infrastructure
Investment Plan for Scotland.
Exhibit 1 
Principles for effective asset management
Principle What this looks like in practice
Strategic alignment
Councils’ asset management strategies align with their corporate
objectives, financial plans, new ways of working, population needs
and net zero commitments.
Investment hierarchy
To support sustainability and cost-effectiveness, asset management
strategies prioritise:
1. maintaining and optimising existing assets
2. repurposing or upgrading existing assets to meet the needs of the
community
3. new investment only when necessary
Monitoring condition
and performance
Councils regularly assess the condition, suitability and performance of
their assets, to help inform investment priorities and support
continuous improvement.
Governance and
accountability
Councils have clear roles and responsibilities for asset management,
with regular, transparent reporting and senior oversight.
Community asset
transfers
Councils have transparent and robust processes in place to assess
and support requests for community asset transfers.
Place-based
approaches
Councils collaborate across services and other public and third sector
organisations to manage assets as a collective resource across their
local area. This has the potential to achieve savings, better align
service provision and create opportunities for joint working. 
Source: Audit Scotland
Page 144 of 314

Page 145

Introduction | 5 
2.  The Code of Audit Practice sets out the requirements for Best Value
audit work. This report covers the thematic aspect of the Best Value audit
requirements. The Accounts Commission has directed auditors to report
on how well councils are managing their assets. In carrying out the work,
auditors have considered the following questions: 
• Part 1 – To what extent does the council have a clear asset
management strategy and plans that are affordable, align with its
corporate objectives, the changing needs of its population, and net
zero commitments?
• Part 2 –To what extent do the council’s governance and
accountability arrangements support effective asset management?
• Part 3 – To what extent does the council have a robust approach to
working with partners and communities in managing its assets?
3.  An improvement action plan is included in the Appendix of this report.
This sets out audit recommendations in key areas, and the council’s
planned response including responsible officers and dates for
implementation.
4.  The coverage of the work is in line with the expectations for council’s
arrangements for the seven Best Value themes in the Local Government in
Scotland Act 2003, Best Value Statutory Guidance 2020. 
Page 145 of 314

Page 146

1. Asset management planning | 6 
1. Asset management planning 
5.  Councils’ capital programmes are a necessary component of
modernising services to improve outcomes for local communities. Doing
this successfully requires good strategic medium- to long-term asset
management and planning. The Accounts Commission’s Local
government budgets 2025/26 briefing reported that capital funding for
2025/26 had increased but remained lower than in 2023/24 and that
investing in new buildings and assets is increasingly expensive. Councils
are relying on borrowing as the main source of funding for capital projects.
In 2025/26, councils intend to borrow £3.13 billion, an increase from
£2.67 billion in 2024/25.
Findings and evidence relating to the council’s asset management strategic
planning arrangements 
Judgements Evidence 
1. The council has an up-
to-date corporate asset
management policy,
strategy and plan that set
out its approach and
priorities for managing
and developing its assets
at a high level. 
The Corporate Asset
Management Framework
(CAMF) covers a sufficient
period of three years
enabling strategic
planning. 
1. The council approved its Corporate Asset Management
Policy, Strategy and Plan, making up the Corporate Asset
Management Framework (CAMF), in January 2024. It sets
out that the policy will be reviewed every three years or
sooner if required in response to legislative, regulatory or
policy changes. The Policy and Governance Group is to
oversee the review, and any material changes will be
referred to the Finance and Resources Committee for
approval, as required. 
2. Management has advised that the council intends to keep
the content of the CAMF up to date through regular updates
to its supporting components, rather than undertaking full
rewrites. As the council plans to update the Corporate Plan
next year, it should review its CAMF and supporting
strategies and plans to determine whether it also needs to
update these to reflect the new strategic ambitions of the
council. 
3. The Corporate Asset Management Policy outlines the key
policy objectives and principles for the council. For
example: 
Objectives
Page 146 of 314

Page 147

1. Asset management planning | 7 
Judgements Evidence 
• ‘Physical assets support efficient and effective service
delivery and achievement of the council’s strategic
priorities’
• ‘Physical assets are economically and environmentally
sustainable’
• ‘Risk is managed in line with our approved strategic risk
management framework’
Principles
• ‘We maximise the public value of our physical assets’
• ‘We only have/keep and invest in the physical assets that
we need to support effective service delivery’
• ‘Our approach to asset management helps mitigate the
impact of climate change’.
4. The council’s CAMF is supported by asset management
strategies and plans for each asset category comprising
Property; Fleet; Greenspace; Housing (HRA); IT; and
Roads. 
5. The Corporate Asset Management Policy sets out the
governance arrangements at a high level but only covers
the structures in place. For example: 
• it states that the governance framework for corporate
asset management aligns with the investment decision-
making framework set out in the council’s approved
Strategic Capital Investment Planning Framework
• it sets out that the council will establish a new Strategic
Investment Advisory Group (SIAG).
6. The current governance arrangements for asset
management are covered in Part 2.
7.  The policy lacks details of the council’s approach to
monitoring and reporting on progress. The governance
structure diagram includes details that the asset
workstreams feed into the Officer Board or the SIAG and
then into the Finance and Resources Committee or the full
Council. However, the governance information included
does not specify what type of information will be monitored
at each level, or the frequency of reporting.
2. The CAMF aligns with
the council’s corporate
objectives and its
commitment to achieving
net zero commitments.
The council’s asset
challenge process also
outlines how the council
1. There is good alignment between the CAMF and the
council’s corporate objectives. For example: 
• one of the key principles of the Corporate Plan is to make
best use of available assets including transferring or
otherwise disposing of those which can best serve the
community in a different way
Page 147 of 314

Page 148

1. Asset management planning | 8 
Judgements Evidence 
aims to prioritise
decision-making,
including by considering
whether assets are fit for
purpose and adaptable to
meeting future needs. But
data to fully implement
this for property assets is
lacking. 
• the Corporate Asset Management Plan’s mission is ‘To
maximise the value of our physical assets and
infrastructure and use them effectively, to realise our
vision and deliver our strategic priorities’.
2. Management has advised that the Investment Blueprint,
which was published in 2021, is the main driver for the
council’s capital investment plans. The Investment Blueprint
sets out how the council can invest to help meet the
Community Planning Partnership’s (CPP) objectives.
Examples include: 
• mitigating the impact of climate change – decarbonising
its assets, maximising the efficiency of its property estate
and encouraging and facilitating sustainable transport
and active travel
• promoting inclusive economic growth and a vibrant
economy – maximising Community Wealth Building
• promoting equality and fairness – providing access to
affordable housing and optimising the use of its physical
and digital assets to improve access to services. 
3. These objectives are also in line with the council’s own
corporate objectives, as the council is a key partner in the
CPP. 
4. The CAMF details a number of principles including that the
council’s approach to asset management helps to mitigate
the impact of climate change. However, it acknowledges
that the council will not achieve its net zero targets without
additional funding.  
5. The CAMF explains that the council’s approach to asset
management will be aligned with its Investment Blueprint
and Financial Strategy. The CAMF also sets out the
council’s asset challenge model to help inform decision-
making. This process includes considering the following
factors as part of decision-making: 
• condition – agreed condition and current asset condition 
• suitability – is the asset fit for purpose and is it adaptable
to future needs
• utilisation – agreed utilisation, current utilisation and
opportunities to share assets 
• value for money – revenue and capital costs, and cost
benchmarking
• climate change – contribution to net zero and climate
adaptation goals. 
6. This model provides the council with clear and consistent
criteria for informing decision-making and prioritising
Page 148 of 314

Page 149

1. Asset management planning | 9 
Judgements Evidence 
investment. However, implementing this approach relies on
adequate data to inform the asset challenge criteria. The
Property Asset Management Plan highlights gaps in data to
inform the asset challenge process. 
7. Each asset management plan for each class of assets has
its own defined strategic priorities. The Property Asset
Management Plan (PAMP) clearly aligns to the Corporate
Plan’s and CAMF’s priorities. The PAMP sets out the
following priorities: 
• To manage sites corporately, supporting the council’s
strategic priorities and principles.
• Commitment to decarbonising the property estate through
proactive decision making and investment.
• Establish a baseline property estate that is affordable,
safe, and fit for purpose.
• Review assets with a locality approach to placemaking,
enabling community and service provision led decision
making.
• Work effectively with partners to maximise shared
opportunities.
• Promote inclusive economic growth and a vibrant
economy.
8. Individual asset category plans set out how the council has
considered changing demographic needs and service
provision. For example, the PAMP includes the following: 
• Demographic projections indicate an increase in
population within Perth and Kinross, with the age profile
becoming older and that the council’s long-term property
requirements may change as a result. 
• Service modernisation and new ways of working mean
that existing properties all need to evolve and be flexible
in use. 
9. Each of the individual asset management strategies and
plans note that there is a ‘golden thread’ from the
Community Plan. However, there is no specific reference to
the council’s Corporate Plan despite one of its key
principles focusing on asset management. Making this link
explicit would enable the council to more clearly
demonstrate how its asset management priorities contribute
to achieving its priorities in the Corporate Plan. 
3. The council has clear
asset management plans
and that align with its
1. The council has a number of asset management strategies
and plans in place as set out above. As part of the audit, we
reviewed the Property Asset Management Strategy and
Plan and the Roads Strategy and Plan because these
Page 149 of 314

Page 150

1. Asset management planning | 10 
Judgements Evidence 
corporate and asset
priorities. 
Asset management plans
do not always include
sufficient detail about how
progress will be
monitored and reported. 
categories of assets are consistently large areas of capital
investment. In addition, property most closely supports the
asset management principle in the Corporate Plan ‘to make
best use of available assets including transferring or
otherwise disposing of those which can best serve the
community in a different way’.
2. Asset management strategies and plans are presented in a
consistent format and support the approach set out in the
CAMF. They consider the status of assets, strategic
priorities for the type of asset and the asset challenge
considerations for the type of assets discussed. 
The Property Asset Management Strategy 2023-29 and
Property Asset Management Plan 
3. The Property Asset Management Strategy sets out the
vision for corporate property “To establish an affordable,
sustainable and fit for purpose property portfolio, via
locality-based asset challenge, that safely delivers council
services and community outcomes” and the priorities which
sit underneath this vision (as discussed in the section
above). The vision and priorities support the council’s
current corporate objectives. For example, one of the six
priorities of the Property Asset Management Strategy
focuses on decarbonising the estate. This aligns with the
corporate priority to tackle climate change and support
sustainable places.
4. The PAMP sets out at a high level the planned investment in
property over the 30 Year Investment Plan. This position is
updated through a 30 Year Investment Plan spreadsheet
that the council maintains. 
5. The PAMP does not go into detail about specific projects.
Instead, the PAMP focusses on high level actions the
council will undertake such as “Complete a review of all
property assets to collect condition, suitability, utilisation,
value for money and climate change data for each asset, to
enable effective asset challenge”. However, the PAMP does
not outline timescales for completion or how progress will
be measured or reported. This makes it difficult to assess
progress with achieving these actions. 
The Roads Asset Management Strategy 2023-29 and
Roads Asset Management Plan 
6. The Roads Asset Management Strategy sets out its vision
“To have affordable, sustainable and well-maintained
Roads assets within Perth & Kinross” which aligns to the
council’s corporate and asset management priorities. The
Page 150 of 314

Page 151

1. Asset management planning | 11 
Judgements Evidence 
Strategy also sets out four strategic priorities which support
this vision: 
• Work collaboratively to maximise shared opportunities.
• Utilise life-cycle management and proactively conduct
preventative maintenance.
• To reduce the council’s carbon footprint providing more
sustainable procurement options whilst also improving
infrastructure resilience and biodiversity.
• The Roads Asset operates in a safe manner.
7. The Roads Asset Management Plan includes a set of
performance indicators against each type of asset covered
(carriageways, footways, street lighting etc). For example: 
• percentage of carriageway length treated
• percentage of repairs within 7 days
• percentage of faults rectified within target time.
8. The council has set targets against some, but not all the
indicators, and has not detailed its current performance
against these measures. In addition, the council has not
detailed where, or how often, these measures will be
reported. 
4. The council has clearly
considered affordability in
its capital programme and
asset management plans. 
1. There is evidence that the council has sufficiently
considered affordability of its capital programme and asset
management plans through its Investment Blueprint,30
Year Investment Plan and Medium-Term Financial Plan.
For example: 
• the paper presented to the council in 2021 with the
Investment Blueprint states that capital investments
should be prudent, affordable, sustainable and provide
value for money taking into account associated revenue
implications
• the 30 Year Plan considers the whole-life costs of assets
• as part of the Medium-Term Financial Plan 2026-32, the
council has carried out scenario analysis such as
considering the impact of inflationary cost pressures and
interest rates as well as the impact of changes in
demographics on affordability. 
2. The Property Asset Management Strategy says that the
Strategy is supported by the Scottish Government
Investment Hierarchy but does not detail how the council
will adhere to these principles in practice. 
3. The council uses a gateway process to assess capital
investment proposals – this considers the following
questions: 
Page 151 of 314

Page 152

1. Asset management planning | 12 
Judgements Evidence 
• Why the council needs to undertake the investment?
• How will the investment deliver best value?
• How commercially viable is the investment proposal? 
• Is the investment proposal affordable?
• Is the investment proposal achievable?
4. In some asset management plans, the council has
estimated the cost of addressing the maintenance backlog.
Management has advised that this is not reported for all
asset types. For example, Fleet and IT assets are on a
replacement programme because they have a relatively
short lifespan and therefore do not have a maintenance
backlog. 
5. The most recent Roads Status report, for 2024/25, set out
that spending on structures (such as bridges) continued to
be shaped by a reactive approach to maintenance. It
reported that the condition of bridges had deteriorated over
the last ten years, with approximately 30 per cent of the
bridge stock in poor or very poor condition. It stated that
without significantly more recurring investment, this was
likely to result in a significant increase in the number of ‘at
risk’ bridges. 
6. Management has advised that the structures team is
adopting a proactive, evidence-based approach to bridge
asset management through lifecycle modelling, using
detailed condition data, deterioration rates, and whole-life
cost assumptions to predict asset performance. This
approach supports better informed decisions about
investment.
7. The council sets an operational borrowing limit each year
which helps to ensure that it remains within its authorised
limit. The council does this by creating headroom between
its authorised limit and its operational boundary. This helps
it to monitor whether its level of borrowing remains at an
affordable level. Borrowing is expected to reduce over the
next six years of the capital programme. 
8. In 2025/26, the council made the decision to apply 1.25 per
cent of council tax income to the loan charges each year to
support the capital budget by alleviating the costs of
borrowing. 
5. The council has taken
a proactive approach to
managing and mitigating
significant building safety
risks.
1. Management advised that Heads of Establishment are
responsible for monitoring building safety. This is confirmed
in the PAMP ‘Every building within the Property Estate
requires an assigned Head of Establishment, tasked with
ensuring the availability of all health and safety information
Page 152 of 314

Page 153

1. Asset management planning | 13 
Judgements Evidence 
relating to the building. They are also responsible for
notifying line managers of any premises management
concerns, and for ensuring the completion of obligatory
statutory tests, such as the weekly fire alarm testing’.
2. The council has developed a risk profile for each type of
asset which outlines the inherent risk and residual risk. Risk
scores for each type of asset were included in the budget
papers for the 2026/27 budget which were presented to the
full Council on 4 March 2026. However, the papers did not
set out mitigating actions to reduce the inherent scores to
the residual scores. The council provided examples of two
risk profiles to the audit team which include mitigating
actions. Management advised that individual risks identified
as part of these profiles will be managed at a service level,
discussed at the Corporate Investment Group (CIG) when
appropriate, and that the risk profiles are being uploaded
into the internal risk management system, PK Performs.
3. The risk profiles highlighted that structures are at high risk.
Management advised that because of this, the council
included additional investment in structures in the 2026/27
capital budget. 
4. The council’s asset management system (Concerto) allows
for specific information to be captured relating to building
safety, such as a register of buildings containing asbestos.
This should help the council to identify which buildings are
affected if any materials are deemed as a building safety
risk in the future.
5. The council advised that there is a five-year rolling condition
survey programme which feeds into the 30 Year Investment
Plan. The council provided an example to the audit team
which shows that the surveys consider areas such as
condition and maintenance requirements for buildings. 
6. The council has taken a proactive approach to managing the
risks associated with Reinforced Autoclaved Aerated
Concrete (RAAC): 
• In an elected member briefing note from September
2023, the council reported that it was aware of RAAC
since May 2019 when this was highlighted by its
Corporate Health and Safety Team. The council had
conducted an initial review of existing building condition
information which was followed up by visual inspections
when required and reported that no buildings were
identified as containing RAAC. 
• Since the initial review and visual inspections in 2019, the
council identified RAAC in Perth Grammar School and
Page 153 of 314

Page 154

1. Asset management planning | 14 
Recommendation 1 
After the Corporate Plan has been updated, the council should review its
CAMF (and supporting asset management strategies and plans) to
ensure that: 
- strategic priorities in the CAMF align to the council’s corporate
priorities and net zero targets
- governance arrangements for monitoring and reporting progress are
clearly set out, including the type of information that will be reported
and frequency of reporting. 
Recommendation 2   
The council should create clear performance measures to track
progress on its asset management strategy, including targets, timelines,
and where and how often results will be reported.
Judgements Evidence 
Bell’s Sports Centre following condition surveys. The
council’s webpage reports that RAAC was identified in
Perth Grammar School in late February 2023. It states
that immediate safety measures and a programme of
works were put in place to remove RAAC materials. The
council states that all RAAC has now been removed from
the building and replaced with a steel profile roof. A
recent elected member briefing (March 2026) outlines an
update on RAAC at Bell’s Sports Centre. It explains that
in June 2025, the council approved a project to remove
RAAC from the sports centre.  
• The council has reported that it has carried out a desktop
assessment of council dwellings and based on the age of
the property and the house types, it is confident that none
of the housing stock will have been constructed from this
cement. There is a risk that the presence of RAAC could
be missed in a desktop assessment, as RAAC in other
buildings was only found through detailed condition
surveys. 
Page 154 of 314

Page 155

2. Governance and performance | 15 
2. Governance and performance 
6.  It is essential that the council has effective governance arrangements in
place to enable transparency, oversight and scrutiny of progress with
implementing its capital programme and asset management strategy. This
enables better-informed decision making and corrective action where
needed. 
Findings and evidence relating to the council’s governance arrangements and
performance 
Judgements Evidence
6. The council’s reporting
and monitoring
arrangements for the
capital plan are clear and
enable good scrutiny and
oversight of progress.
However, the reporting and
monitoring arrangements
for actions within asset
management plans could
be improved. 
The council produces
annual reports on the
status of each of the asset
types which help to inform
strategic decision making. 
1. The council has a clear governance structure in place to
oversee progress towards its capital programme and asset
management plans. The council established the CIG to
manage and monitor the CAMF including the 30 Year
Investment Plan. 
2. The CIG meets monthly and has appropriate senior
leadership in place. The membership of the group includes
relevant Strategic Leads, and its remit includes: 
• reviewing the progress of the priorities in the CAMF
through annual asset stream status reports
• managing and monitoring the council’s capital
programme by challenging, scrutinising and supporting
projects which are reported as being out with agreed
scope and tolerances
• incorporating existing investment commitments and new
corporate initiatives into the 30 Year Investment Plan. 
3. The council has also established the SIAG which consists
of one representative from each political group within the
council. It is chaired by the Leader of the Council and is
supported by council officers consisting of the executive
team and relevant strategic leads. 
4. Management advised that Strategic Leadership Team
(SLT) oversight of asset management is primarily through
the CIG and SIAG as members of the SLT sit on these
groups. 
5. A report presented to the full Council in January 2024
setting out the CAMF detailed that asset status reports
Page 155 of 314

Page 156

2. Governance and performance | 16 
Judgements Evidence
would be prepared annually. These provide information on
the capital and revenue investment in the year alongside
an update on the condition, suitability and utilisation of
assets to support decision making.
6. As part of this audit, we have reviewed the most recent
asset status report for Property and Roads. As described
above, these reports provide a comprehensive update of
the asset base. However, these do not provide a clear
update on performance against the ambitions of the
respective strategies and plans. For example, they do not
include long-term trends against corporate asset
management targets/ key performance indicators,
including timescales for achieving these. In addition, data
on, for example the suitability and utilisation of assets is
not reported for all property, or for roads assets.
7. The council reports progress on the capital budget to the
Finance and Resources Committee on a quarterly basis.
8. The council also presents annual performance reports to
the full Council which include some examples of measures
relating to asset management. For example: 
• number of attendances at pools, indoor and outdoor
sports and leisure facilities and programmes
(thousands)
• total number of houses built in rural areas of Perth and
Kinross
• number of community groups supported in the asset
transfer process. 
9. As the measures in the annual performance report do not
cover all asset categories, it is not possible to establish an
overall view of the council’s performance in relation to
asset management from this information alone. 
7. The council regularly
reports progress on its
capital spending. The
‘significant capital projects’
update report produced by
the council shows that in
most cases, the projects
are expected to be
completed on time.
However, the council does
not define what is
significant which may lead
to inconsistent reporting. 
1. The most recent capital monitoring report which covers the
period up to 31 December 2025 notes that 53 per cent of
the projected outturn for capital expenditure for 2025/26
had been spent. In 2024/25, the council spent £161.4
million in capital expenditure, of which £133.5 million
related to the composite capital (general fund) programme
and £27.9 million to the HRA. This spend was against final
net capital budgets of £149.0 million and £28.1 million
respectively.
2. The council reports updates for ‘significant capital projects’
alongside the capital monitoring reports. However,
management has advised that there is no fixed definition
of a major project. It is based on factors such as the size
Page 156 of 314

Page 157

2. Governance and performance | 17 
Judgements Evidence
Performance against Local
Government Benchmarking
Framework indicators is
mixed. In 2024/25 the
council is performing better
than its Family Group and
national average in the
Local Government
Benchmarking Framework
indicators for operational
buildings however it is not
performing as well in
relation to council
dwellings. 
and scale of the project, complexity, strategic importance
and associated risks. 
3. The council would benefit from defining significant capital
projects to ensure consistency and enhance reporting as it
is currently unclear why certain projects meet the criteria
and others do not. For example: 
• the Pitlochry High School Extension Project is not
deemed to be significant despite the total approved
budget from 2025/26 to 2030/31 being £8.5 million
• the Kinross Community Campus Sports Facilities and
Crieff Community Campus Sports Facilities projects
have been deemed significant despite the total
approved budgets for 2025/26 to 2030/31 being £6.9
million and £6.3 million respectively.
4. The council has not clearly set out completion dates for all
projects within the capital budget therefore it is difficult to
establish how well the council is progressing with its plans
in terms of timescales. 
5. The council’s performance across four asset management
Local Government Benchmarking Framework indicators is
detailed in Exhibit 2 below: 
• In 2024/25, the proportion of operational buildings
suitable for current use was 96.1 per cent, this is above
its family group and the national average (90.5 per cent
and 85.7 per cent respectively). 
• In 2024/25, the internal floor area of operational
buildings in satisfactory condition was 92.6 per cent
which is also above its family group and the national
average (88.4 per cent and 90.3 per cent respectively). 
• The ‘council dwellings meeting Scottish Housing Quality
Standards’ indicator displayed a steep decline during
the Covid-19 pandemic and a quick recovery the
following year. Despite improvement in recent years, it is
yet to return to pre-pandemic levels. In 2024/25, 80.3
per cent of council dwellings met Scottish Housing
Quality Standards which is slightly below the family
group and the national average (80.6 per cent and 82.9
per cent respectively). 
• In 2021/22 (the last time data was collected as set out
below Exhibit 2), the proportion of council dwellings that
are energy efficient was 82 per cent which is slightly
below the family group and national average. 
Page 157 of 314

Page 158

2. Governance and performance | 18 
Exhibit 2
Trend in performance against Local Government Benchmarking Framework indicators
Perth and Kinross Council has demonstrated mixed performance 
Note: Data for the Proportion of council dwellings that are energy efficient (%) indicator has not
been collected since 2021/22. Energy efficiency targets for social housing are temporarily on
hold pending the development of a new standard that aligns with Scotland's net zero target. 
Source: Audit Scotland using Local Government Benchmarking Framework 
Recommendation 3 
The council should clearly define what a significant capital project is, to
ensure consistency in which projects are included in its ‘Significant
capital projects’ reports.
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Percentage (%)
Year
Operational buildings
suitable for current use (%)
Internal floor area of
operational buildings in
satisfactory condition (%)
Council dwellings meeting
Scottish Housing Quality
Standards (%)
Proportion of council
dwellings that are energy
efficient (%)
Page 158 of 314

Page 159

3. Partnership working and community engagement | 19 
3. Partnership working and
community engagement 
7.  It is essential that councils consider how they can collaborate across
services and with other public and third sector organisations to manage
assets. This has the potential to achieve savings, better align service
provision and create opportunities for joint working. Councils should also
have transparent and robust processes in place for supporting and
assessing community asset transfer requests and engaging with their
communities on asset management plans and priorities.
Findings and evidence relating to the council’s partnership working and
community engagement arrangements 
Judgements Evidence
8. The council has clearly
set out its ambition to work
collaboratively with
partners in managing
assets in its Property and
Roads Asset Management
Strategies and Plans.
These include actions but
do not set out timescales
so it is difficult to assess
whether the council is on
track to achieving its
ambition.  
There are good examples
of the council working with
partners to collaboratively
manage assets. 
Property 
1. The council sets out its ambition to work with partners to
maximise shared opportunities in its Property Asset
Management Strategy and corresponding plan. One of the
strategy’s six strategic principles is ‘Work effectively with
Partners to maximise shared opportunities’. The strategy
details actions the council will undertake, such as: 
• continue to work with Community Planning and Third
Sector partners to establish public service delivery hubs
across Perth and Kinross; contributing to a reduction in
the overall public service estate
• continue to explore co-location opportunities and
optimisation of assets to deliver services
• continue to explore opportunities for collaborative
working with new and existing partners and external
bodies.
2. The plan includes details of various projects the council is
involved in. For example: 
• One Public Estate Programme – a collective review of
all public property estates seeking to reduce gross
internal area and ongoing revenue costs
• Police Scotland Co-location Localities – building on the
success of the co-location with Police Scotland in the
Page 159 of 314

Page 160

3. Partnership working and community engagement | 20 
Judgements Evidence
Crieff Area Office, the council are investigating
opportunities for further collaboration with Police
Scotland across its localities
• Working Smarter – review of office working across
localities as part of the transformation programme.
3. While the council has set out some key actions and
associated projects, it does not set out timescales for
delivering these or how progress will be reported. This
makes it difficult to assess whether the council is on track
to achieve its ambitions. 
4. There is evidence that the council has worked with
partners in managing its assets. For example, the council: 
• shares its Pullar House office in Perth with NHS
• shares its Crieff Area Office with Police Scotland
• co-locates with Live Active Leisure and Culture Perth
and Kinross in a Pitlochry school 
•  shares premises with the Health and Social Care
Partnership in Blairgowrie.
Roads
5. The council also sets out its ambition to work
collaboratively in its Roads Asset Management Strategy
and corresponding plan. One of the strategy’s four
strategic principles is ‘Work collaboratively to maximise
shared opportunities’. The Roads Asset Management
Strategy and Plan also includes actions the council will
undertake, for example: 
• Continue to work with the Tri-Council Roads
Maintenance Strategy Group in collaboration with
Dundee City Council, Angus Council & Tayside
Contracts - This group is part of the overarching Roads
Maintenance Partnership (RMP) which has been in
place since 1996. The RMP will continue to participate
in this group to facilitate Best Value and collaboratively
approach roads maintenance.
• Explore opportunities for collaborative working with
external bodies – the council will approach collaboration
with relevant external bodies to promote research,
identify common objectives and discover areas where
joint projects, shared resources and expertise could lead
to mutual benefits and improve service delivery.
• Collaborate with developers/community groups to
facilitate development – the council will work with
Transport Planning and communities to ensure projects
Page 160 of 314

Page 161

3. Partnership working and community engagement | 21 
Judgements Evidence
that impact the road assets are aligned with corporate
objectives and, where appropriate, future-proofed.
6. Similar to the property actions, the council does not detail
when these actions are to be completed by and how
success will be measured and reported. 
9. It is not clear how the
council has considered the
views of its community
when developing the
priorities in its CAMF but
there is evidence that the
council has considered the
views of communities when
carrying out locality
reviews. 
1. The council lacks a co-ordinated and strategic approach to
engaging with communities on setting asset management
priorities in its CAMF. However, one of six strategic
principles set out in the Property Asset Management
Strategy is reviewing assets with a locality approach to
placemaking, enabling community and service provision
led decision making with communities. 
2. The PAMP outlines some actions to achieve this principle
but does not set out timescales for these. For example,
‘We will continue to engage with the community, we are
involved in The Big Place Conversation, which forms part
of the Local Development Plan (LDP). This is a
conversation between the Council and the communities of
the Perth & Kinross area that seeks to find out how
residents use their locality and what is important to them.
Outcomes of this, and the related LDP, will be used to
guide investment decision making and asset planning’. 
3. Management advised that community views are also fed in
through elected members and CPP discussions which
enable communities to speak directly to senior council
officers, elected members and partner organisations.
However, it is difficult to see evidence of this.
4. The council has provided some examples of community
opinions being taken into consideration when conducting
Locality Asset Reviews: 
Pitlochry Locality Asset Review 
5. The council has demonstrated that it used community
feedback to inform decisions about assets in Pitlochry. In
2023, the council sought feedback through a ‘Big Place
Conversation’ which comprised three workshops and
various meetings. The council received approximately 800
comments from this process around the proposals. 
6. Despite the feedback not being consistent, the council
identified the following themes: 
• Lack of current and historic investment in Pitlochry
facilities.
• School not considered /perceived as a community asset.
Page 161 of 314

Page 162

3. Partnership working and community engagement | 22 
Judgements Evidence
• Leisure facilities were poor, not open at weekends,
threatened with closure.
• Public library does not open enough.
• Local interest in community asset transfer.
• Potential for housing on vacant sites.
7. The council notes that this feedback helped shape the
options and it determined that the best option was to
relocate services within a single community hub at the
school premises. The council determined that this offered
better and more sustainable services for the community. In
June 2024, the Finance and Resources Committee
approved £8.7 million in funding for this project. 
Coupar Angus Locality Property Challenge 
8. As the council believed that the Pitlochry Locality Asset
Review process worked well, the council has taken a
similar approach for assets in Coupar Angus, starting with
community consultations. This work has not yet
concluded.  
10. The council has a clear
and transparent approach
to supporting and
assessing community
asset transfer (CAT)
requests against its set
criteria which includes
assessing community
benefits, sustainability and
impact on council services. 
The council often supports
community groups into
alternative solutions to the
full CAT process and
reports on these in its
Community Empowerment
Annual report. 
1. In line with the Community Empowerment (Scotland) Act
2015, the council approved its Community Asset Transfer
(CAT) policy in April 2017. The policy references
guidance, which is available on the council’s website,
however the policy is not accessible on the council’s
website except through committee papers for the Strategic
Policy and Resources Committee on 19 April 2017. 
2. The policy details the two stages of the CAT process – the
first stage is an expression of interest, and the second
stage is a detailed application form which constitutes the
legal start of the CAT request. The policy also sets out the
rationale for encouraging the transfer of council assets to
community bodies, including: 
• devolving power to neighbourhoods encouraging citizen
involvement and community action
• generating long term sustainable revenue streams for
Community Bodies, making them more sustainable
• providing opportunities for long-term working between
public and voluntary sectors. 
3. To date, one CAT request has been approved – the
Kinloch Rannoch Outdoor Centre has been transferred to
the Rannoch Community Trust. The most recent annual
Community Empowerment Report, which will be presented
to the Housing and Social Wellbeing Committee in June
2026 reports that since April 2025 it has supported 19
Page 162 of 314

Page 163

3. Partnership working and community engagement | 23 
Judgements Evidence
groups interested in the CAT process (which consists of
seven new enquiries and 12 ongoing from previous years). 
4. The council sets out clear guidance on the CAT process
and the council uses a scoring matrix when assessing
requests which can be accessed on the CAT section of
the council’s website. The scoring matrix considers criteria
such as community benefit, sustainability and the impact
on council services. For the approved CAT request, the
council reported its assessment transparently by
presenting the respective scores against each of the
criteria to the full Council to inform its decision. 
5. The council has a clear approach to engaging with
community groups to support them to develop viable
proposals. This includes allocating a Community
Empowerment Officer so that groups have a single point
of contact with the council, and support from a Community
Learning and Development Team. The groups can also be
introduced to representatives from key funding
organisations such as the Scottish Land Fund when
appropriate. 
6. The council launched an ‘Advancing Community Asset
Fund’ in February 2025, with the first award made in May
2025. The fund was established as a way of allocating
council budget funding to groups to help them with their
community ownership goals. Management has advised
that this is currently a one-off fund. The most recent
community empowerment report details that for the
2025/26 financial year, £0.075 million of capital and
£0.104 million of revenue funding was made available. To
date £0.050 million of capital and £0.077 million of
revenue funding has been committed. The council has
reported that the following projects had received support:
• Pitlochry Town Hall 
• Dunning Town Hall 
• Coupar Angus Town Hall 
• Dunkeld North Garages 
• Alyth Museum
• Cloichard Depot (Pitlochry) 
• Blairingone School and Schoolhouse. 
7. CATs are well promoted by the council. Information on
CAT requests is available on its website, and it has held
joint information sharing evenings with the Community
Ownership Support Service about the CAT process. The
council website includes a list of council owned properties
Page 163 of 314

Page 164

3. Partnership working and community engagement | 24 
Recommendation 4
The council should publish its Community Asset Transfer Policy on the
website alongside the guidance to enhance transparency of the
Community Asset Transfer process.
Judgements Evidence
and a case library which contains details of CAT requests
that have reached Stage 2 (currently this consists of one
approved CAT and one pending CAT request).   
8. The council has clear governance arrangements in place
around CATs and how and where these will be subject to
review and approval. Stage 1 applications are assessed
by the CAT team and stage 2 applications are presented
to the relevant council committee for the decision to be
made. 
9. The Community Empowerment annual report is published
on the CAT section of the website and is presented to the
Housing and Social Wellbeing Committee. 
10. In February 2025, the council launched the Community
Minibus Transfer Scheme which applies similar principles
of CATs to transfer former council minibuses to community
groups. Community groups are required to apply and
demonstrate need, benefit, and ability to sustain a bus.
Page 164 of 314

Page 165

Appendix | 25 
Appendix
Improvement action plan
Issue/risk Recommendation
Agreed management
action/timing
1. Alignment between the
priorities in the Corporate
Plan and the Corporate Asset
Management Framework
The council plans to update its
Corporate Plan in 2027. It is
clear that the current Corporate
Plan aligns with the Corporate
Asset Management Framework
and supporting strategies and
plans despite the wording of
objectives and priorities not
always being consistent. 
Following the update of the
Corporate Plan, there is a risk
that investment decisions do not
align to the council’s updated
corporate objectives. 
After the Corporate Plan has
been updated, the council
should review its CAMF (and
supporting asset management
strategies and plans) to ensure
that: 
• strategic priorities in the
CAMF align to the
council’s corporate
priorities and net zero
targets
• governance
arrangements for
monitoring and reporting
progress are clearly set
out, including the type of
information that will be
reported and frequency of
reporting.
Review of CAMF &
supporting asset
management strategies
and plans will be carried
out after the Corporate
Plan has been updated.
Capital Investment &
Asset Management
Team Leader  
Dec 2027
2. Asset Management
Performance Information
The council sets out planned
actions in its asset management
strategies and plans, but it does
not include timelines or
measures to assess success. 
This creates a risk that it is more
difficult to effectively oversee
and scrutinise performance and
progress towards achieving
asset management priorities. 
The council should create clear
performance measures to track
progress on its asset
management strategy,
including targets, timelines,
and where and how often
results will be reported. 
Clear Performance
measures will be created
and reported annually.
Capital Investment &
Asset Management
Team Leader  
November 2026
Page 165 of 314

Page 166

Appendix | 26 
Issue/risk Recommendation
Agreed management
action/timing
3. Tracking progress of
capital projects
As part of the capital monitoring
updates to the Finance and
Resources Committee the
council reports on significant
capital projects, including
expected completion dates and
whether they are on track.
However, it does not clearly
define what counts as a
“significant” project.
This creates a risk of
inconsistency in deciding which
projects should receive closer
oversight and scrutiny.
The council should clearly
define what a significant capital
project is, to ensure
consistency in which projects
are included in its ‘Significant
capital projects’ reports.  
Agreed this will be
reported to Finance and
Resource Committee 
Chief Finance Officer 
30 September 2026 
4. Community Asset Transfer
Policy 
The Strategic Policy and
Resources Committee approved
the Community Asset Transfer
Policy on 19 April 2017. The
council has dedicated a part of
its website to Community Asset
Transfers, including guidance
on the Community Asset
Transfer process, but has not
published the policy on the
website. 
There is a risk that community
groups are not fully aware of the
council’s policy on Community
Asset Transfers.  
The council should publish its
Community Asset Transfer
Policy on the website
alongside the guidance to
enhance transparency of the
Community Asset Transfer
process. 
Agreed a new policy has
been drafted and will be
uploaded once approved.   
Communities Team
Leader 
30 September 2026 
Page 166 of 314

Page 167

Best Value thematic work – Asset management
Perth and Kinross Council
How well councils are managing assets to achieve their
corporate objectives and respond to challenges around
financial sustainability and climate change 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
Page 167 of 314

Page 168

Page 168 of 314

Page 169

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: Internal Audit Follow Up 
Report Number: 26/192 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance 
1. Purpose 
1.1 The purpose of this Report is to present current summary of Internal Audit’s
‘follow up’ work relating to actions due for completion up to April 2026. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Follow Up Outcomes
5. Conclusion
6. Impact Value Assessment
7. Appendices 
2. Recommendation 
It is recommended that the Committee: 
2.1 notes the current position in respect of the agreed actions arising from Internal
Audit’s work. 
3. Background/Context 
3.1  The Global Internal Audit Standards in the UK Public Sector (GIAS (UKPS))
and the Code of Practice for the Governance of Internal Audit in UK Local
Government require that the Audit Committee should oversee the tracking
and implementation of actions agreed following audits. 
3.2 Internal Audit request evidence from Services which confirms that actions
have been implemented and, therefore, controls have been improved.
7
Page 169 of 314

Page 170

4. Progress Update 
4.1 There were 26 actions due to be completed up to April 2026. 15 actions have
been verified by Internal Audit as having been satisfactorily completed. The
remaining actions have revised completion dates, as detailed in Appendix 1
and 2. Appendix 2 contains details of actions which were previously
considered in private session of the Audit & Risk Committee. 
5 Conclusion 
5.1 Not applicable. 
6. Impact Value Assessment 
6.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
7. Appendices 
7.1 Appendix 1 – Actions with a completion date of up to September 2025 which
have yet to be completed 
7.2 Appendix 2 - Actions with a completion date up to April 2026 which have yet
to be completed 
Page 170 of 314

Page 171

Appendix 1 
Actions with a completion date up to April 2026 which have yet to be completed
Finding Action  Action owner
& Service
Date(s) Current status Internal
Audit
Opinion
25-05 - Housing Regulator
Submission  
Action Point : 5 - Interim
target 2026  
Importance: Medium 
Audit Committee Date: 
23 Mar 2026  
The Energy Efficiency
Standard for Social Housing
(EESSH) was introduced to
improve the energy efficiency
of social housing in Scotland,
with the aim of reducing
energy consumption, fuel
poverty and greenhouse gas
emissions. As part of our
review, it was identified that a
significant number of
properties failed to meet
EESSH requirements.
Specifically, 1055 properties
did not comply with the
standard in 2024/25; 451 of
Targeted plan to address
EESSH failures, taking into
account budgetary
pressures
(N Lennon,
Service
Manager,
Housing
Capital
Improvements
& New Build)
Mar 2026
Aug 2026   
The service has
reported a net
improvement of 267
properties meeting
EESSH, based on 469
properties brought up
to standard offset by
202 that are now
failing; however, these
figures remain
provisional. Validation
is currently limited due
to the absence of
detailed address level
data from the
consultant, which has
been requested but not
yet received. The
reported changes are
partly attributed to
updates in SAP
calculation
methodology and the
replacement of cloned
EPC data with actual
EPC assessments,
Satisfactory
7
Page 171 of 314

Page 172

these properties are under
exemption (due to technical or
economic reasons) or an
abeyance (tenant issues, for
example, opting out of the
improvements required or not
allowing access). 
resulting in some
properties now failing
where they previously
passed. Initial internal
checks have also
identified discrepancies
in recorded outcomes.
Consequently, the
service is not yet able
to confirm whether the
target of 114 properties
as at March 2026 has
been achieved,
pending receipt and
review of the full
dataset.
25-05 - Housing Regulator
Submission  
Action Point: 7  
Importance: Medium 
Audit Committee Date: 
23 Mar 2026 
Whilst it is appreciated that
the current reports and quality
assurance processes for the
compilation of the submission
to the Scottish Housing
Regulator ensure that the
information is accurate, there
A comprehensive contract
strategy has been
completed to tender for a
new system. This strategy
acknowledges the
limitations and sets out a
clear pathway for
procuring a new housing
asset management
solution that meets both
current and future
operational and regulatory
needs. This process has
taken significant time given
the complexities involved.
Market testing has been
(N Lennon,
Service
Manager
Housing
Capital
Improvements
& New Build
J McColl,
Service
Manager
(Housing)
Repairs &
Improvements) 
Mar 2026  
Aug 2026
The work remains
incomplete. The
service has informed
that the supplier
delayed initial options
and pricing by nearly
four months, and
subsequent cost
revisions have required
further updates to the
Housing Management
Team. A phased, more
cost-effective approach
is now proposed to
implement a
replacement database,
Satisfactory
Page 172 of 314

Page 173

is scope for considering some
improvement in that the audit
identified the Council does not
maintain a centralised asset
database accessible across
all departments. 
conducted to ensure the
proposed system will
deliver improved
functionality, integration,
and data reliability.
However, the costs have
been passed to our
Finance colleagues for
review and comment, as
the quotation received far
exceeds the anticipated
costs, therefore it is
unclear at this stage
whether we will have a
budget to meet the full
requirements. 
with scope to expand
functionality later. Core
components would
support data migration
and replicate current
capabilities while
reducing reliance on
the existing system.
Additional resourcing
options are included.
Stakeholder feedback
is still pending, after
which the final report
will be submitted to
Housing Management
Team on 9 June 2026. 
25-05 - Housing Regulator
Submission  
Action Point : 9 - Phased go-
live  
Importance: Low  
We have observed positive
progress in rent collection,
accompanied by a significant
reduction in gross rent
arrears. However, it has been
identified that there is
currently no utilisation of
advanced technologies to
We are currently testing
NEC Analytics, which is a
form of AI, to help with the
identification of trends and
forecasting to target our
work and free up staff to
focus on those more
complex and challenging
cases.
(A McCallum,
Service
Manager
(Housing)  
Mar 2026
Aug 2026   
NEC Analytics system
is now live. Initially a
small number of staff
from operational team
were given access to
use the system, but
from mid of May,
access was rolled out
to the whole Central
Arrears Team. They
will be using the tool
twice a week initially
for a set range of
arrears-focused tasks.
This will then allow
Satisfactory
Page 173 of 314

Page 174

proactively detect potential
rent arrears at the tenant
level. Several other councils
have successfully
implemented predictive
analytics to identify early
indicators of financial distress
among tenants, and this may
be a route for PKC to
consider.
them to see the
effectiveness of the
system and feedback
any improvements or
enhancements that
need to be made to the
system.  The
managers from Central
Arrears Team are
working very closely
with Housing Systems
Support Team to
ensure that they get
the best out of this tool.
However, the service is
of the opinion that it is
too early to evaluate
the system. 
25-05 - Housing Regulator
Submission  
Action Point: 10  
Importance: Medium 
Housing Regulator mentioned
both Gypsy/Travellers sites
are in failures in meeting
several Social Housing
Charter Outcomes such as
Equalities (outcome 1),
Communication (outcome 2),
Tenant satisfaction
surveys are embedded
within our programme and
scheduled in accordance
with both statutory
requirements and resident
feedback. 
Review the findings of the
Satisfaction Survey for
2025/26. Consider the
potential to extend the
current contract or
alternative means of
A McCallum,
Service
Manager
(Housing)
Apr 2026 
Aug 2026    
In terms of
Gypsy/Traveller
satisfaction levels, a
survey was carried out
in December 2025.
The results showed a
67% satisfaction level
amongst
Gypsy/Traveller
residents. This is a
drop in satisfaction
levels from previous
surveys and is mainly
Satisfactory
Page 174 of 314

Page 175

Participation (outcome 3),
Repairs, maintenance and
improvement (outcome 5),
Gypsy/ Travellers (outcome
16). There is an ongoing
replacement of the chalets
and general upgrades in both
sites. However, on the
completion day of this audit,
the Comprehensive
Satisfaction Survey has not
been carried out.
collecting the satisfaction
levels. The regulator only
requires updates every 3
years for these indicators.
due to the ongoing
refurbishment at
Double Dykes. Whilst
all residents have been
residing in their new
chalets for some
months, there are still
extensive external
works ongoing on the
site. Service will be
looking to complete
another survey when
the works have been
fully completed, and
residents have had the
chance to settle more
into their new chalets.
The Knowledge
Partnership contract
has been extended
until end of March
2027.  
A24-01 - Business Continuity
Management (BCM) Planning 
Action Point : 1.3
Importance: High
Audit Committee Date: June
2025 
Our observation highlighted
Ensure all BCP are signed. Strategic
Leads,
supported by S
Terras,
Emergency
Planning &
Business
Continuity
Officer
Jun 2025 
Nov 2025 
Mar 2026
Sep 2026 
Evidence has been
provided to support
that 8 out of 10 BCPs
signed off, with a
further one being at
final draft stage, with
training and exercise to
follow. The Service will
continue to support the
Accepted
Page 175 of 314

Page 176

the need for Business
Continuity Plans (BCPs) to be
regularly updated, particularly
regarding contact details and
emergency actions. Despite
the introduction of a new
template, up to-date BCPs
were not found across all
services. The audit concluded
without verifying signed BCPs
for all services. 
remaining Strategic
Lead to complete this. 
A24-01 - Business Continuity
Management (BCM) Planning 
Action Point : 2.1
Importance: High
Audit Committee Date: June
2025 
Our observations revealed
that the previous versions of
the BCPs had not routinely
been subject to adequate
testing and communication
(training and exercise) since
prior to the Covid-19
pandemic. Furthermore, the
latest Business Continuity
Management (BCM)
procedure has not been
finalised, preventing us from
Arrange training and
exercising of all plans once
approved and as per the
BCP tracker. 
S Terras,
Emergency
Planning &
Business
Continuity
Officer
Jun 2025 
Nov 2025 
Mar 2026
Sep 2026
As highlighted above, 8
out of 10 BCPs
exercised and trained,
with this to be
undertaken for one
shortly. The Service
will continue to support
the remaining Strategic
Lead to complete this. 
Accepted
Page 176 of 314

Page 177

providing any comments on
its effectiveness at this stage. 
Page 177 of 314

Page 178

Page 178 of 314

Page 179

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: Internal Audit Update 
Report Number: 26/193 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance 
1. Purpose 
1.1 The purpose of this Report is to present a summary of Internal Audit’s work
undertaken as part of the Internal Audit Plans for 2024/25 and 2025/26. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Progress Update
5. Outcome from Consultancy Work
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendation 
It is recommended that the Committee: 
2.1 notes progress with Internal Audit activity. 
3. Background/Context 
3.1  The Global Internal Audit Standards in the UK Public Sector (GIAS (UKPS))
and the Code of Practice for the Governance of Internal Audit in UK Local
Government require that the Audit Committee should receive regular
engagement reporting for internal audit activity and on performance relative to
the approved plan. 
8
Page 179 of 314

Page 180

3.2 Work has continued on assignments from Perth & Kinross Council’s Internal
Audit Plans. In addition, work has continued to be undertaken in connection
with the Internal Audit provision for Perth & Kinross’ Integration Joint Board. 
3.3 Internal Audit continues to support Services to investigate matches for the
National Fraud Initiative in line with the timeline as laid down by Audit
Scotland. 
4. Progress Update 
4.1 Appendix 1 shows the status of audits arising from the Internal Audit Plans. 
4.2 Internal Audit is currently involved with further areas of unplanned work. There
has been significant activity in relation to unplanned work in year. Where any
control issues arise as a result of these, reports will be presented to the Audit
& Risk Committee. 
4.3 The Internal Audit Plan for 2025/26 included two assignments for Strategic
Partnering within both Education & Learning and Environment &
Infrastructure. The latter has involved Internal Audit contributing to a working
group to support a review of Operations. This will continue into 2026/27 audit
plan as the working group continues to complete its objectives. 
4.4 The audit of Risk Maturity, which has not been completed due to operational
resourcing reasons, will be transferred into the Internal Audit Plan for 2026/27. 
5 Conclusion 
5.1 Not applicable. 
6. Impact Value Assessment 
6.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
7. Appendices 
7.1 Appendix 1 – Internal Audit Activity 
Page 180 of 314

Page 181

Appendix 1
INTERNAL AUDIT UPDATE
Internal Audit Activity 
Audit
No.
Title Lead Service(s) Status as at
October
2025
Audit
Committee
2024/25    
A24-04 Affordable Housing Housing &
Communities
Completed June 2026     
2025/26    
C25-01 Strategic Partnering –
Education & Learning
Education &
Learning
Complete June 2026
C25-02 Strategic Partnering –
Environment &
Infrastructure
Environment &
Infrastructure
Continuing
to 2026/27
June 2026
A25-03 External Funding Multiple Services Ongoing September
2026
A25-04 Health & Safety Strategic Planning,
People &
Performance
Completed June 2026
A25-05 Housing Regulator
Submission
Housing &
Communities
Completed March 2026
A25-06 Risk Maturity Strategic Planning,
People &
Performance 
September
2026
A25-07  Insurance Finance & Business
Support
Completed June 2026
A25-08 Administration of a
social care
establishment
Adult Social Work Completed December
2025
A25-09 Petty Cash All Services Completed March 2026
A25-10 Payroll Strategic Planning,
People &
Performance
Ongoing September
2026
A25-11 Assessment &
Charging
Finance & Business
Support
Ongoing September
2026 
8
Page 181 of 314

Page 182

Page 182 of 314

Page 183

1 
Internal Audit Report
Strategic Planning, People and Performance
25-04 Health & Safety  
June 2026 
Final Report
(Report No. 26/194) 
Legal and Governance
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH 
9
Page 183 of 314

Page 184

2 
25-04 Health & Safety 
Contents by Section 
1. Introduction          
2. Audit Background Information        
3. Scope and Limitations         
4. Assessment of the Control Environment      
5. Summary of Findings         
6. Conclusions          
7. Acknowledgement         
8. Action Implementation & Follow Up     
9. Management Action Plan 
10. Authorisation
11. Distribution
12. Assessment Definitions 
Page 184 of 314

Page 185

3 
1.  Introduction 
1.1 This assignment forms part of the Internal Audit plan for 2025/26, approved by
the Audit Committee on 25 June 2025. The period under review for the
purposes of the audit exercise was financial years 2024/25 and 2025/26. 
1.2 The indicative scope for the audit was to review arrangements in place for the
corporate oversight of health and safety within the Council. 
1.3 This audit is linked to the Strategic Risk Register SR011 – The health and safety
of staff and the public is not adequately protected which was reported to be
Priority 1, High in May 2025. 
2.  Executive Summary 
2.1  The audit has found that reasonable assurance can be placed on the Council’s
internal controls in relation to the review arrangements in place for the corporate
oversight of Health and Safety within the Council. 
2.2  There are twenty-three actions arising from the findings in Section 6. An action
plan is included in Section 10. Once these actions are completed, Internal Audit
should be able to place substantial assurance on the arrangements in place. 
3.      Audit Background Information 
3.1 Local authorities have a fundamental responsibility to ensure the health, safety
and welfare of their employees, service users, contractors, and members of the
public who may be affected by council activities. This duty is underpinned by a
comprehensive framework of UK Health & Safety legislation, primarily the
Health and Safety at Work etc. Act 1974 (HASWA) and associated legislation,
which places a statutory obligation on employers to provide a safe working
environment and manage risks effectively. 
3.2 The section 2(2) of the Act, states that without prejudice to the generality of an
employer’s duty under the subsection 1, the matters to which that duty extends
include in particular
(a) the provision and maintenance of plant and systems of work that are, so far
as is reasonably practicable, safe and without risks to health;
(b) arrangements for ensuring, so far as is reasonably practicable, safety and
absence of risks to health in connection with the use, handling, storage and
transport of articles and substances;
(c) the provision of such information, instruction, training and supervision as is
necessary to ensure, so far as is reasonably practicable, the health and safety
at work of his employees;
(d) so far as is reasonably practicable as regards any place of work under the
employer’s control, the maintenance of it in a condition that is safe and without
Page 185 of 314

Page 186

4 
risks to health and the provision and maintenance of means of access to and
egress from it that are safe and without such risks;
(e) the provision and maintenance of a working environment for his employees
that is, so far as is reasonably practicable, safe, without risks to health, and
adequate as regards facilities and arrangements for their welfare at work. 
3.3 In the local council context, compliance is especially important due to the
diverse nature of services delivered such as housing, social care, waste
management, roads, education, parks, and public spaces. Each service area
carries unique operational risks, requiring tailored controls, risk assessments,
training, and monitoring arrangements. Councils must also comply with
supporting regulations such as the Management of Health and Safety at Work
Regulations 1999, Control of Substances Hazardous to Health (COSHH),
Manual Handling Operations Regulations, and Reporting of Injuries, Diseases
and Dangerous Occurrences Regulations (RIDDOR). 
3.4 According to the Health and Safety Executive (HSE), any organisation as a
minimum has a duty to have the processes and procedures required to meet
the legal requirements, including: 
• a written health and safety policy; if they employ 5 or more people
• assessments of the risks to employees, contractors, customers, partners,
and any other people who could be affected by your activities and record
the significant findings in writing. Any risk assessment must be ‘suitable
and sufficient’,
• arrangements for the effective planning, organisation, control, monitoring
and review of the preventive and protective measures that come from risk
assessment;
• access to competent health and safety advice;
• providing employees with information about the risks in their workplace
and how they are protected; 
• instruction and training for employees in how to deal with the risks; 
• ensuring there is adequate and appropriate supervision in place; 
• consulting with employees about their risks at work and current preventive
and protective measures. 
4.  Scope and Limitations 
4.1  The audit has reviewed the relevant legislation and governance requirements
in fulfilling corporate health and safety (H&S) of the Council. 
4.2 To arrive at an opinion on the achievement of the control objective, the review
included,
• Document reviews concerning H&S policies and procedures,
• Interviews with key staff who are responsible for the H&S of the different
services,
• Reviews of any third-party documents, audit reports and arrangements with
independent audits.
Page 186 of 314

Page 187

5 
• Ensuring lessons learned from previous non-compliance and reported
incidents/accidents are incorporated into future planning. 
4.3  There were no limitations identified that would impact the Audit. 
4.4 The details of the control objectives reviewed and the Internal Audit’s
assessment of their strength of control in each area are contained within
Section 5 of this report. 
5.  Assessment of the Control Environment 
5.1  The table below contains a summary of the number of findings and their ratings,
as detailed in Section 12, against each control objective, along with Internal
Audit’s assessment of the adequacy and effectiveness of the controls in place
to meet each of the objectives agreed for this audit. Further details, including
any improvement actions, are set out in the Management Action Plan. 
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1 To ensure that the Council
complies with all H&S legislation
and statutory requirements. 
2 4   Reasonable
Assurance
2 To ensure that adequate steps
are taken to protect employees,
service users, contractors, and
the public from harm. 
2 4 1 1 Reasonable
Assurance
3 To ensure H&S training, incident
reporting, and risk assessments
are robust and effective. 
4 3 2  Reasonable
Assurance 
5.2 The auditor has assessed that reasonable assurance can be placed on controls
overall in relation to the arrangements in place for the corporate oversight of
Health and Safety within the Council. Meaning:
“There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited.” 
5.2 A summary of the key findings and actions is provided in section 6. Please note,
however, the following areas of good practice which have been highlighted
during the audit: 
5.2.1 The Chief Executive and the Executive Leadership Team providing leadership
on Health and Safety matters at Council, and this is discharged by setting a
policy, ensuring that business plans are in place, that regular consultation with
employees and trade unions take place, and that the Council’s overall approach
is thoroughly monitored and reviewed. We have noticed a clear organisation
structure for reporting and managing H&S in place. Council website has details
Page 187 of 314

Page 188

6 
of the recognised Trade Unions with names and contact details of their
representatives and those who cooperatively work with the Council. 
5.2.2 The Strategic Health and Safety Consultative Committee has approved the
Occupational Health and Safety Policy on 21 January 2026, signed by the Chief
Executive and the Strategic Lead of Strategic Planning, People and
Performance. This has replaced the old policy prepared and approved in 2018
and is readily available on ERIC, uploaded on 9 February 2026. 
5.2.3 The strategic objective of the new policy is in line with the legal requirements
and HSE guidance (HSG65) provided. The guidance explains the Plan, Do,
Check, Act approach and shows how it can help to achieve a balance between
the systems and behavioural aspects of management. The Policy provides
clarity on Health and Safety responsibilities of both the employer and the
employees.   
5.2.4 As per Section 7 of the Management of Health & Safety at Work Regulations
1999, Council has appointed a dedicated H&S Team within the Council, and
the Team comprises highly competent and qualified professionals to meet the
legal requirement for competent advice.  In addition, they provide consistent
training, advice and support to managers and staff, to ensure they meet their
legal obligations in relation to Health and Safety at work. Also, there are various
groups of stakeholders and committees, such as Trade unions, Employee Joint
Consultative Committee and Strategic H&S Consultative Committee that input
their feedback for the planning, doing and monitoring of H&S within the Council. 
5.2.5 In accordance with the Occupational Health & Safety Policy, where specialist
technical advice cannot be provided internally within the Council, competent
external specialist advice must be obtained. We noted that technical specialists
have been engaged in certain areas to support preventive maintenance
activities. These services remain subject to third-party audit requirements and
the instructions of external agencies and regulators such as the Health and
Safety Executive (HSE), Scottish Fire and Rescue Service (SFRS), Scottish
Environmental Protection Agency (SEPA), and the Care Inspectorate etc. In
most of the cases their advice and instructions have been followed to ensure
full statutory compliance. 
5.2.6 The auditor attended the Strategic Health and Safety Consultative Committee
meetings held on 12 March 2026 and 01 June 2026 and was satisfied that there
was evidence of employee representative participation and active involvement
of service managers and team leaders on the H&S matters considered and
discussed. 
5.2.7 Audit has reviewed last year’s Employee Joint Consultative Committee (EJCC)
minutes and is satisfied with the content of the recorded minutes, participation
and decision making. During these meetings, H&S and Fire safety performance
has been discussed.  This includes details of incident reporting and training
figures.   
Page 188 of 314

Page 189

7 
5.2.8 Audit has observed the certificate of employers’ liability insurance which is a
compulsory insurance required under the Employers’ Liability (Compulsory
Insurance) Act 1969 and associated regulations, which mandates employers to
obtain insurance to cover liability for employee injury or illness arising from
work. This has been obtained and renewed for the current year (until 30
September 2026) from Zurich Insurance Company Ltd. All fleet vehicles have
been insured under Motor insurance and other relevant insurances have been
obtained by Council including public liability insurance. 
5.2.9 We appreciate the efforts taken by the H&S Team to move from an expensive
external system for the incident reporting to an in-house system. Currently, all
the incidents are reported through the MyPKC platform and those are monitored
by H&S Team. Most of the services have confirmed that they use the current
system. The auditor participated in a pilot training session on incident
investigation conducted by the H&S Team on 29April 2026 and satisfied with
the content and delivery. 
5.2.10 The auditor has checked the arrangement of H&S of the fleet employees and
is satisfied with overall risk assessment procedures, vehicle maintenance,
drivers’ assessments (based on the point system), incident reporting, follow up
with insurance team and performance monitoring. Specially, recent
implementation of random eye test of the drivers is welcomed. 
5.2.11 The auditor has checked the arrangements for H&S of the HART team and
observed that clearly defined H&S responsibilities, including the completion and
adherence to risk assessments, infection control measures, safe systems of
work, and established reporting procedures are in place. All the risk
assessments have been reviewed on 18 March 2026, are maintained, up to
date, and are subject to annual review. 
5.2.12 Justice services operate across multiple sites in Perth within a higher risk
environment and demonstrate good practice, through clear identification and
management of key risks to the employees. As per the team leader, all risk
assessments are up to date and mandatory H&S training is in place for all staff.
Incidents are formally reported and reviewed, lone working is supported by
policy and personal alert systems, and staff wellbeing is promoted through
regular supervision, absence management, and access to counselling, with
overall compliance overseen by the Justice Services Health & Safety Meetings. 
5.2.13 In Communities Repair & Improvement Services, a strong and proactive
approach to H&S through comprehensive risk assessments, regular mandatory
training, and consistent communication is in place. Safety is embedded into
daily operations through toolbox talks, monthly meetings, standing H&S agenda
items, and unannounced site checks carried out by both compliance officers
and trade coordinators. The use of corporate systems for incident reporting,
lone-working monitoring, and job management ensures risks are tracked
effectively, while quarterly meetings with the Health & Safety Team help the
service stay aligned with legislative updates and best practice. Staff wellbeing
is also prioritised through one-to-one meetings, an open-door policy, and
proactive support via Occupational Health.
Page 189 of 314

Page 190

8 
5.2.14 H&S of Direct Services is clearly positioned as providing a foundation to all
operational activities, with responsibilities embedded through training,
supervision, and monitoring.  This takes place across refuse collection, waste
management, grounds maintenance, and Burials. There is statutory training for
all staff (in Key2 system), and specialist training needs (e.g. machinery use,
manual handling, driver competence) are clearly identified and delivered as per
Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) and Provision
and Use of Work Equipment Regulations 1998 (PUWER). Incidents and near
misses are effectively managed through a learning-focused investigation
framework, while controls for lone working, wellbeing support, and clear
communication channels further strengthen safety culture. Ongoing monitoring,
engagement with the Health & Safety Team, and external reviews provide
assurance of compliance and continuous improvement. 
5.2.15 Based on the Local Government Benchmarking Framework (LGBF) data and
internal information, sickness absence has shown a slight year on year
reduction from 2023/24 to 2024/25, with the overall time lost for all employees
decreasing from 5.38% to 5.31% at the Council. However, some areas continue
to experience high levels of sickness absence, particularly Integrated
Healthcare for Older People and Environment & Infrastructure, both of which
remain high risk service areas. People & Culture have introduced several
supportive measures to help reduce H&S related sickness absence. For
example, new managers can access direct case handling support from the
Employee Relations & Wellbeing team, and the Erica chatbot enables
managers to book appointments for advice. In addition, targeted work in
Education & Learning, including a dedicated resource reviewing absence
trends and a working group focused on reducing challenging behaviour in
schools, aims to reduce Violence and Aggression(V&A) incidents related
sickness levels. All managers also have access to a Power BI dashboard,
allowing them to monitor sickness absence trends within their teams. 
6.  Summary of Findings 
6.1 Below is a summary of key findings and actions, which are reflected in the
Management Action Plan, detailed in section 10.  
6.2 To ensure that the Council complies with all Health & Safety legislation
and statutory requirements 
6.2.1 As per HSG65, all large public and private sector organisations are required to
maintain formal procedures for auditing and reporting health and safety
performance. As per the Corporate Occupational Health & Safety Policy section
4.1.4 on Auditing “Strategic Lead areas will be required to audit their own
practices and record these details (inspection etc) in line with their own Action
Plan. In conjunction, the H&S Team will also audit following a H&S audit plan
which will identify compliance and good practice. Audit reports will be reported
into the Employee Joint Consultative Committee and Executive Leadership
Team for discussion and comment.” 
Page 190 of 314

Page 191

9 
6.2.2 Our review identified that the H&S Team does not currently have an established
audit plan in place, despite this being a policy requirement. Although this issue
has been acknowledged within the Corporate Risk Register (with an initial
completion target of 31 December 2025), the deadline has since been deferred.
During our discussions, the Team Leader confirmed that the audit process is
expected to be implemented in the Team Plan 2026/27.
[Action point 01] 
6.2.3 Our review noted that, in relation to Risk Register entry SR011, “the
implementation of a robust corporate Health and Safety policy and the
associated topic-specific arrangements” has not yet been fully completed. 
However, we found that no formal approval had been granted for the following
guidance documents:
• Alcohol and Drug Use Guidance (HR Guides)
• First Aid Guidance
• Infection Control Guidance
• General Risk Assessment Guidelines
In addition, no guidance has yet been developed for the Provision and Use of
Work Equipment (PUWER).
[Action point 02] 
6.2.4 Our review of H&S practices within Fleet Management identified that there is
currently no comprehensive policy in place to prevent drivers from operating
vehicles while under the influence of Alcohol or Drugs. Although a memo
referencing an Alcohol and Drug Policy was issued to all staff by the Direct
Service Manager on 14 March 2025, this communication alone is insufficient to
ensure consistent understanding and enforcement. Internal audit opinion’s is
that there should be a robust, council wide Drug and Alcohol policy. 
[Action point 03] 
6.2.5 Section 2.3 in the Occupational Health and Safety Policy, clearly states that
H&S Team (under People & Culture) must work in synergy with a range of other
services including, IT, Insurance, Facilities Management, Estates, Property
Services, Housing Repairs, Education & Learning, and Direct Services to
ensure an integrated and cohesive approach to risk management. 
6.2.6 During our review we have noticed many insurance claims due to various
reasons including fire at properties, trip/ fall and driver errors. However, there
is a lack of effective coordination between the H&S Team and the Insurance
Team, despite the clear importance of this collaboration and explicit
requirement within organisational policies. 
[Action point 04] 
6.2.7 Audit acknowledges that employees working directly with the public may face
increasing risks of Violence and Aggression (V&A), stemming from the nature
of certain frontline services and interactions. As part of its commitment to
safeguarding staff, the Council identifies these behaviours ranging from verbal
abuse to physical assault as significant organisational risks requiring proactive
management and continuous improvement. We observed that established
Page 191 of 314

Page 192

10 
systems including MOSAIC, Northgate (Housing management information
system’ person alerts) facilitate the sharing specific information among Housing
and Social Work Teams. These systems support staff and contractors’
awareness of potential risks and enable informed decision-making when
engaging with service users. 
6.2.8 Despite recognising the seriousness of the V&A, there are gaps in adequacy of
planning, monitoring, and control measures in place by management to protect
a minority of staff. These gaps are especially evident for teams such as
Licensing, Environmental Health, and Food Health and Safety, where staff may
attend locations or interact with individuals without full visibility of potential risks.
The absence of consistent and accessible risk information limits the ability of
manager and staff to undertake appropriate precautionary measures, such as
conducting visits in pairs rather than individually.
[Action point 05]
6.2.9 The Employment Right Act 2025, effective from April 2026, increases
employer’s responsibility and liability for preventing harassment, including
sexual harassment. Employers now need to take “all reasonable steps” to
prevent sexual harassment in the workplace. In our inquiry from the service
manager, it was highlighted challenges in managing this duty due to third party
involvement such as parents, contractors, agency workers etc. In our
observation, it indicates that appropriate preventive arrangements to address
these risks have not yet been fully established.
[Action point 06] 
6.3 To ensure that adequate steps are taken to protect employees, service
users, contractors, and the public from harm 
6.3.1 Several external contractors have been engaged by the Council to deliver a
range of property related services, including janitorial support, cleaning
services, school catering, school crossing patrols, and facilities management to
various Heads of Establishment (HoE). With respect to H&S, each contractor is
fully responsible for ensuring the safety of their own employees as well as any
other individuals present within the premises while carrying out the contracted
activities. The extracts from the relevant parts from the sample contracts have
been reviewed during the audit. 
6.3.2 Although the services are provided directly to HoE, overall oversight and
performance monitoring of all contracted services should be carried out by the
Property Services Team. The responsible person for the management of HoE
Property Services has been appointed recently, and monitoring activities are
still under development stage. It is recognised this as key role since monitoring
is essential in parallel with external audit actions to be implemented.                     
[Action point 07] 
Page 192 of 314

Page 193

11 
6.3.3 A new Head of Establishment Premises Handbook was published in May 2025,
replacing the old handbook from June 2015, following the consultation with
representative Service Managers, Heads of Establishment and Head of
Establishment Steering Group. The new handbook has not yet been uploaded
to ERIC, meaning Heads of Establishment do not have access to the current
version, specifically the new Summary of Tasks is required to be accessed by
everyone. At present, only the previous version remains available on the
system.
[Action point 08] 
6.3.4 Training on the newly issued Head of Establishment Premises Handbook has
not yet been fully completed at the time of the audit. Our inquiries confirmed
that several school HoE and non-school HoE have to be trained, indicating that
the rollout remains incomplete. 
[Action point 09] 
6.3.5 In Property Services, multiple suppliers have been appointed based on their
respective areas of expertise to undertake Planned Preventive Maintenance
(PPM) activities across different sites. When upcoming maintenance is
identified, the Property Team raises the relevant work orders within the
Concerto system. All work orders are subject to authorisation by the appropriate
manager through the system. Suppliers are also granted access to the
Concerto system, enabling them to view and manage upcoming maintenance
tasks assigned to them. Notifications are generated through the system to
ensure suppliers are aware of scheduled PPM activities. 
6.3.6 During the Concerto walkthrough testing, a significant number of overdue PPM
tasks were identified. These included statutory, non-statutory, and asset
register based maintenance tasks. Among the overdue statutory tasks, primary
and secondary school properties were included. In our inquiry, management
advised that the backlog was primarily attributable to a single supplier
experiencing resourcing pressures. In addition, the KPI of the supplier reported
for the period October to December 2025 indicates an overall downward trend
in performance. 
October November December
Statutory completion rate 61.54% 17.39% 28.07%
Non-statutory completion rate 42.7% 41.38% 29.63%
Overall completion rate 46.96% 36.36% 28.83% 
[Action point 10] 
6.3.7 In the Concerto system, HoE module is newly embedded to check the duties
done by relevant Business Managers (HoE) and it only includes the schools.
Since there are many other establishments that require proper maintenance
and Compliance Team or Business Manager’s attention, those should be
included in the module soon. Our inquiry has not provided any targeted date on
completion of this.
[Action point 11]
Page 193 of 314

Page 194

12 
6.3.8 The Properties Team confirmed that electrical and mechanical inspections
have been carried out in some of the buildings. However, Structural Survey has
not been carried out along with that. In our inquiry, it was mentioned to us
Building Condition Surveys operate on a five-year rolling programme, managed
by a dedicated Condition Survey Team. These surveys are not recorded within
the PPM system, and the schedule of upcoming surveys must be obtained
directly from the team. We have not yet received this schedule for our review.
[Action point 12] 
6.3.9 In our discussion with the Service Manager Corporate Landlord, it was
mentioned that Council is following SFG20 (the industry standard for building
maintenance). However, this SFG20 system is still in development stage and
not yet fully integrated to the Concerto system. In our opinion for the compliance
this integration is highly important.
[Action point 13] 
6.3.10 Regarding suggested remedial action in the Concerto Remedial Action Bar, it
appears quick actions have not been taken and followed up by the Compliance
Team. For example, regarding Perth Grammar Schools Sports Grammar pitch
servicing have been highlighted as high priority in November 2025 which
require structural engineers work due to movement on column base. However,
it has not yet been completed on our audit date. This section should be cleared
by a responsible person in timely manner.
[Action point 14] 
6.4 To ensure H&S training, incident reporting, and risk assessments are
robust and effective 
6.4.1 There is currently no formal mechanism in place to ensure that all required
training is completed by all employees. Although all mandatory modules are
available through the e-learning platform, there is no effective cross-checking
or oversight. Managers can request a report of their staff to check the training
completions and there is no current direct access for managers to do this via
the PKC Learn system.
[Action point 15] 
6.4.1 During our review on HART team’s H&S, it was notified to us that the staff of
the HART team have been unable to complete e-learning due to lack of
protected time. 
[Action point 16] 
6.4.2 In our inquiry in relation to mandatory H&S training of HART teams it was
noticed that provided mandatory training compliance has significant gaps.
Several training courses are well below expected compliance levels:
• Violence & Aggression Awareness – 25%
• DSE Training – 45%
• Infection Control e-learning – 28% (though the workshop is higher at 87%)
Page 194 of 314

Page 195

13 
• Moving with Dignity – 75%
Out of the 40 mandatory training categories, only 14 have achieved a
completion rate above 50%, which is a significant concern given the high
number of medication errors recorded in Q2 25–26. The auditor is of the opinion
that training compliance must be monitored more rigorously to ensure staff are
equipped with the necessary knowledge and skills to reduce errors and
maintain safe service delivery.
[Action point 17] 
6.4.3 In accordance with the Reporting of Injuries, Diseases and Dangerous
Occurrences Regulations (RIDDOR), the Council must ensure that all
reportable incidents are notified to the HSE within the statutory timeframes.
Serious incidents (including fatalities, specified major injuries, hospital
treatment of non-workers, and dangerous occurrences) must be reported
immediately and without delay, reflecting the requirement for urgent regulatory
notification. All other reportable events must be followed by a full written
submission to the HSE within 10 days, ensuring timely and accurate
compliance with the regulatory process. In cases where an employee is
incapacitated for more than seven consecutive days, the incident must be
formally reported within 15 days of the accident date, consistent with the
statutory reporting thresholds for over 7-day injuries. The H&S Team is
responsible for determining RIDDOR applicability. 
6.4.4 We noted that, on several occasions, RIDDOR reportable incidents were not
submitted within the statutory timelines required by the HSE. In certain cases,
reports were submitted several months after the incident occurred. However,
adherence to these timeframes is essential to maintain compliance and support
effective oversight of workplace health and safety. 
[Action point 18] 
6.4.5 The H&S Team has made renewed efforts to address incidents, however, the
lack of reduction in reportable incidents observed by the auditor has highlighted
the need for stronger support and understanding from all managers. Without
proper safety measures in place, employees remain at risk, insurance costs
may rise due to increased claims, and the Council faces potential harm to the
public as well as reputational damage. It is therefore essential that managers
actively contribute to targeted actions aimed at reducing reportable incidents
across the organisation.
[Action point 19] 
6.4.6 The manager of Direct Services confirmed that approximately 300 Risk
Assessments and Safe Systems of Work are currently in place in his service.
We identified that the volume and complexity of these documents present
challenges in terms of effective management and oversight of H&S. However,
efforts are underway to reduce this complexity, and a substantial review has
been conducted by the H&S Team. A designated responsible officer has been
appointed to oversee and follow up on the review outcomes. Several
improvement actions have been identified within the action plan, and work is
underway to implement them.
Page 195 of 314

Page 196

14 
6.4.7 In accordance with section 53 of the Fire (Scotland) Act 2005 and regulation 9
of the Fire Safety (Scotland) Regulations 2006, fire risk assessments must be
carried out and kept under review regularly. In general practice, this includes
annual review (as adopted across councils, schools, offices and care
environments) and review following any significant change or where the
assessment is no longer valid. 
6.4.8 Scottish Fire and Rescue Service (SFRS) carried out 4 audits at Council
premises during 2025/26. The SFRS also carried out 21 operational visits to
domestic high-rise properties. In our inquiry, it is mentioned that H&S Team
does not monitor outstanding actions from SFRS audit. They mentioned that
this information will be available to the Head of Establishment from each
audited property or to the Housing and Repairs Team for domestic premises.
With the development of Concerto these outstanding actions will be signed off
when the task is completed. However, there is no evidence on the completion
of any actions just now and there is no one responsible person from the H&S
Team to follow up.
[Action point 20] 
6.4.9 The auditor was informed that the H&S Team carry out an annual FRA review
of all buildings with sleeping accommodation such as care homes and other
buildings with significant fire risks such as Friarton Depot. And re-assess
existing FRAs at 24 months, 36 months, 48 months or 60 months frequencies
depending on many factors. However, the fire risk assessment schedule
provided is not completed and the re assessment frequencies have not been
set up properly for the many of the properties.
[Action point 21] 
6.4.10 In relation to the Council Headquarters at 2 High Street, a new FRA was
completed on 27 May 2026 following the significant changes in layout and
occupancy during 2025. However, the assessment identified that although the
overall fire risk is considered tolerable, few high-priority actions remain and
several recommendations from the previous FRA (August 2023) have still not
been implemented. Although fire drills were carried out in March and May 2026,
the existence of outstanding and newly identified issues indicates that fire
safety arrangements require further strengthening to ensure full compliance
and effective risk management. 
[Action point 22] 
6.4.11 Regarding the Pullar house building, the ownership has changed in September
2025, and the last FRA was dated 24 July 2024. In the FRA schedule it has
mentioned that the next FRA is due in July 2026 and in our inquiry, it is
mentioned that there is ongoing discussion with other users of the building
regarding next FRA. However, the FRA is yet to be done.
[Action point 23] 
Page 196 of 314

Page 197

15 
7.  Conclusion 
7.1  The Internal Audit review is able to place reasonable assurance on the overall
control environment for arrangements for the compilation of the annual
submissions to the Housing Regulator. The agreed actions, once implemented,
should enable the Internal Audit to place substantial assurance on these. 
8.  Acknowledgements 
8.1  Internal Audit would like to thank all officers who were involved in this audit, 
G Boland, Strategic Lead – Strategic Planning, People & Performance
P Johnstone, People & Culture Manager
L Hamilton, Team Leader- Health & Safety 
M Young, Fire Safety Advisor
F Gamlen, Systems Officer
G Key, Principal Officer – Energy & Engineering
A Cook, Service Manager – Contracts & Facilities
L Peoples, Team Leader -Contracts & Facilities
A Brown, Assistant Fleet Manager
C Shepherd, Team Leader Communities - Repairs & Improvements
N Gibson, Team Leader (HART)
R Ross, Team Leader – Justice
N Taylor, Direct Services Manager
E Bayne, HR Team Leader
S Burke, PA to Strategic Lead Strategic Planning, People & Performance 
9.  Action Implementation & Follow up 
9.1  Responsibility for the maintenance of adequate and effective controls rests with
management. Where the audit has identified areas for management action,
these are identified in the Management Action Plan. Where a decision is taken
by management not to act in response to findings from this review, it is the
responsibility of management to assess and accept the risk arising from non-
implementation. 
9.2  Achievement of the agreed actions is monitored through Internal Audit’s ‘follow
up’ arrangements.  
Page 197 of 314

Page 198

16 
10.  Management Action Plan 
Action
Point
Para.
No Finding Risk
Rating Agreed Action & Evidence Action Owner
Target
Completion
Date
1 6.2.2 Our review identified that the H&S
Team does not currently have an
established audit plan in place,
despite this being a statutory
requirement. Although this issue
has been acknowledged within the
Corporate Risk Register (with an
initial completion target of 31
December 2025), the deadline has
since been deferred. During our
discussions, the Team Leader
confirmed that the audit process is
expected to be implemented in the
Team Plan 2026/27.  
4 Agreed action: 
An audit process and programme
for Health and Safety
performance will be piloted and
subsequently implemented as
part of Team Plan 26/27. 
Agreed evidence:
Approved audit plan
L Hamilton
Team Leader-
Health & Safety 
March 2027
2 6.2.3 Our review noted that, in relation to
Risk Register entry SR011, “the
implementation of a robust
corporate Health and Safety policy
and the associated topic-specific
arrangements” has not yet been
fully completed. 
However, we found that no formal
approval had been granted for the
following guidance documents:
3 Agreed action: 
Continue review of supporting
documentation, to align with
updated Corporate Health and
Safety Policy. This is part of
Team Plan 26/27. 
Agreed evidence:
Approved guidance documents
L Hamilton
Team Leader-
Health & Safety 
March 2027
Page 198 of 314

Page 199

17 
• Alcohol and Drug Use Guidance
(HR Guides)
• First Aid Guidance
• Infection Control Guidance
• General Risk Assessment
Guidelines
In addition, no guidance has yet
been developed for the Provision
and Use of Work Equipment
(PUWER). 
3 6.2.4 Our review of H&S practices within
Fleet Management identified that
there is currently no
comprehensive policy in place to
prevent drivers from operating
vehicles while under the influence
of Alcohol or Drugs. Although a
memo referencing an Alcohol and
Drug Policy was issued to all staff
by the Direct Service Manager on
14 March 2025, this communication
alone is insufficient. Internal audit
opinion’s is that there should be a
robust, council wide Drug and
Alcohol policy. 
3 Agreed action: 
There are a Management
Arrangement and Guidance in
place. Even though there is no
control sheet on documents, they
have all been through Employee
Joint Consultative Committee
(EJCC). 
Managers should identify this
and put in place suitable and
sufficient control measures to
address risks from drugs and
alcohol. The People & Culture
Manager will explore approaches
adopted by other local authorities
to understand potential options
available and agreed to take
further discussions with trade
unions. 
Agreed evidence:
P Johnstone
People &
Culture
Manager
January
2027
Page 199 of 314

Page 200

18 
• Board minutes 
• Approved new drug and
Alcohol policy 
4 6.2.6 During our review we have noticed
many insurances claimed due to
various reason including fire at
properties, trip/ fall, driver errors
etc. However, there is a lack of
effective coordination between the
H&S Team and the Insurance
Team, despite the clear importance
of this collaboration and explicit
requirement within organisational
policies. 
3 Agreed action: 
• Agree with Insurance Team
on quarterly updates.
• Ask for Insurance Team input
into Committee quarterly
reporting.
• Feedback on claims and legal
rulings from Insurance Team
to Health and Safety Team.
• Incorporation of insurance
team information in reporting
and planning carried out by
the Health and Safety Team. 
Agreed evidence:
• Quarterly update reports from
Insurance Team
• Communication with
Insurance Team 
L Hamilton
Team Leader-
Health & Safety 
G Walker
Corporate Asset
Management
Officer 
December
2026
5 6.2.8 Despite recognising the
seriousness of the V&A, there are
gaps in adequacy of planning,
monitoring, and control measures
in place by management to protect
a minority of staff. These gaps are
especially evident for teams such
4 Agreed action: 
Develop and implement
enhanced processes to enable
appropriate access to existing
risk information and systems, in
compliance with relevant legal
and data protection
G Boland
Strategic Lead –
Strategic
Planning,
People &
Performance 
June 2027
Page 200 of 314

Page 201

19 
as Licensing, Environmental
Health, and Food Health and
Safety, where staff may attend
locations or interact with individuals
without full visibility of potential
risks. The absence of consistent
and accessible risk information
limits the ability of managers and
staff to undertake appropriate
precautionary measures, such as
conducting visits in pairs rather
than individually. 
requirements. This should
include establishing a more
coordinated and consistent
approach to sharing V&A risk
information across services. 
Agreed evidence:
Documented procedures on new
or revised processes for
accessing and sharing V&A risk
information. 
6 6.2.9 The Employment Right Act 2025,
effective from April 2026, increases
employer’s responsibility and
liability for preventing harassment,
including sexual harassment.
Employers now need to take “all
reasonable steps” to prevent
sexual harassment in the
workplace. In our inquiry from the
service manager, it was highlighted
challenges in managing this duty
due to third party involvement such
as parents, contractors, agency
workers etc. In our observation, it
indicates that appropriate
preventive arrangements to
address these risks have not yet
been fully established. 
3 Agreed action: 
There are no final guidelines
provided by the government yet
specifically defining “all
reasonable steps”. However,
Sexual Harassment has been
added to the General Risk
Assessment for consideration.
Further arrangements are under
the development stage such as
whistleblowing guidance for
managers and employees and
processes for complaints and
grievances etc. 
Agreed evidence:
Approved whistleblower
guidance
P Johnstone
People &
Culture
Manager
October
2026
Page 201 of 314

Page 202

20 
Approved new processes
developed on Sexual
Harassment 
7 6.3.2 Although the services are provided
directly to HoE, overall oversight
and performance monitoring of
specific contracted services should
be carried out by the Property
Services Team. The responsible
person for the management of HoE
Property Services has been
appointed recently, and monitoring
activities are still under
development stage. It is recognised
this as key role since monitoring is
essential in parallel with external
audit actions to be implemented. 
4 Agreed action: 
All outsourced HoE tasks to be
logged on the HoE Concerto
system, and random sampling to
be provided to support
completion of these checks.  
All H&S issues in relation to
relevant outsourced services to
be discussed as part of relevant
operational monitoring meetings
as required, and all H&S incident
reports to be provided upon
request.  
Agreed evidence:
HoE records on Concerto.
Minutes of operational meetings.
Copies of any relevant
inspections and observations.
Any relevant H&S incident
reports and follow on actions 
A Cook 
Service
Manager –
Contracts &
Facilities
September
2026
8 6.3.3 A new Head of Establishment
Premises Handbook was published
in May 2025, replacing the previous
version from June 2015, following
consultation with representative
1 Agreed action: 
SharePoint site to be signed off,
with updated Handbook
available. Heads of
Establishment who have been
L Hamilton
Team Leader -
Health & Safety 
Completed
Page 202 of 314

Page 203

21 
Service Managers, Heads of
Establishment and Head of
Establishment Steering Group. The
new handbook has not yet been
uploaded to ERIC, meaning Head
of Establishment do not have
access to the current version,
specifically the new Summary of
Task is required to be access by
everyone. At present, only the
previous version remains available
on the system. 
trained have been linked to the
updated Handbook already. 
Agreed evidence:
Link to the updated document 
9 6.3.4 Training on the newly issued Head
of Establishment Premises
Handbook has not yet been fully
completed at the time of the audit.
Our inquiries confirmed that several
school HoEs and non-school HoEs
are still awaiting training, indicating
that the rollout remains incomplete. 
3 Agreed action: 
Final training session is on 2
June 2026 
Agreed evidence:
Updated training completion list
L Hamilton
Team Leader-
Health & Safety 
Completed
10 6.3.6 During the Concerto walkthrough
testing, a significant number of
overdue PPM tasks were identified.
These included statutory, non-
statutory, and asset register based
maintenance tasks. Among the
overdue statutory tasks, primary
and secondary school properties
were included. In our inquiry,
management advised that the
3 Agreed action: 
• To work with current supplier
to improve performance
during current contract which
is due to expire in Apr 2027. 
• Contractor performance also
improved during first quarter
of 2026 and continues to
improve. New contract will
also be in place from Apr
G Key 
Principal Officer
– Energy &
Engineering
April 2027
Page 203 of 314

Page 204

22 
backlog was primarily attributable
to a single supplier experiencing
resourcing pressures. In addition,
the KPI of the supplier reported for
the period October to December
2025 indicates an overall
downward trend in performance. 
2027, and contractor may not
be successful in winning new
contract. 
Agreed evidence:
• KPI for the first quarter 2026
• Contractor award document
2027
11 6.3.7 In the Concerto system, HoE
module is newly embedded to
check the duties done by relevant
Business Managers (HoE) and it
only includes the schools. Since
there are so many other
establishments that require proper
maintenance and Compliance
Team or Business Manager’s
attention, those should be included
in the module soon. Our inquiry has
not provided any targeted date on
completion of this. 
3 Agreed action: 
All other relevant premises to be
added to HoE Concerto
Database.
HoE to be identified and relevant
records to be updated. 
Agreed evidence:
Data base updated with all
relevant HoE information. 
A Cook 
Service
Manager –
Contracts &
Facilities
October
2026 
12 6.3.8 The Properties Team confirmed
that electrical and mechanical
inspections have been carried out
some of the buildings. However,
Structural Survey has not been
carried out along with that. In our
inquiry it was mentioned to us
Building Condition Surveys operate
3 Agreed action: 
A programme for Building
condition surveys for 2026/27 are
currently being reviewed
manually by the in-house building
surveyor and will be issued to the
supplier to undertake these.
Further, development is also
G Key 
Principal Officer
– Energy &
Engineering 
July 2026
Page 204 of 314

Page 205

23 
on a five-year rolling programme,
managed by a dedicated Condition
Survey Team. These surveys are
not recorded within the PPM
system, and the schedule of
upcoming surveys must be
obtained directly from the team. We
have not yet received this schedule
for our review. 
required with Concerto to
automate the programme for
Building condition surveys which
is currently being explored at
present. Structural surveys are
not carried out as standard only
where identified by the building
surveyors in accordance with
Scottish Government core facts
methodology. 
Agreed evidence:
Programme of surveys 
13 6.3.9 In our discussion with the Service
Manager Corporate Landlord, it has
mentioned that the Council is
following SFG20 (the industry
standard for building maintenance).
However, this SFG20 system is still
in development stage and not yet
fully integrated to the Concerto
system. In our opinion for the
compliance this integration is highly
important. 
2 Agreed action: 
SFG20 is to be integrated into
concerto for future contract. It is
not required at present for
current contract as robust and
compliant specifications are in
place already but for
improvement and efficiency for
the new contract this is to be
automated using SFG20. 
Agreed evidence:
Systems will be integrated in
advance of new contract being
awarded in Apr 2027. 
G Key 
Principal Officer
– Energy &
Engineering 
November
2026
Page 205 of 314

Page 206

24 
14 6.3.10 Regarding the suggested remedial
actions recorded in the Concerto
Remedial Action Bar, it appears
that timely actions and follow-ups
have not been carried out by the
Compliance Team. However, it has
been explained to us that the
required work has in fact been
completed, but the system has not
been updated accordingly.
This kind of outdated system
information may result in inaccurate
reporting, misrepresentation of
compliance status, and the
perception that critical actions are
delayed or not performed. 
4 Agreed action: 
Work is currently progressing
with Concerto team and IT
colleagues to investigate
automating of some of the
functions which will free up time
for members of staff to review
remedial tasks. A re-structure in
Property services will also
provide additional resources to
dedicate to this function. 
Agreed evidence:
• Confirmation from
IT/Concerto team on fully
automation
• Reports run on remedial
actions 
G Key 
Principal Officer
– Energy &
Engineering 
December
2026
15 6.4.1 There is currently no formal
mechanism in place to ensure that
all required training is completed by
all employees. Although all
mandatory modules are available
through the e-learning platform,
there is no effective cross-checking
or oversight. Managers can request
a report of their staff to check the
training completions and there is no
current direct access for managers
to do this via the PKC Learn
system.
4 Agreed action: 
• Training records will be part
of the new audit process.
• Ongoing discussion with the
supplier of the platform and
PKC IT to develop an API
(Application Programming
Interface) and potentially
develop a dashboard to
ensure effective tracking and
completion of mandatory
training. 
L Hamilton
Team Leader-
Health & Safety 
J Cassidy
Employee
Engagement
Officer 
March 2027
Page 206 of 314

Page 207

25 
Agreed evidence:
• Training completion records
• New platform to track he is
training completion 
16 6.4.2 During our review on HART team’s
H&S, it was notified to us that the
staff of the HART team have been
unable to complete e-learning due
to lack of protected time. 
3 Agreed action: 
Allocate protected time for staff
to complete outstanding
mandatory e-learning and
monitor progress through locality
co-ordinators. 
Agreed evidence:
Training records showing
completion rates, list of
outstanding training, and periodic
monitoring reports. 
N Gibson
Team Leader -
HART 
August
2026
17 6.4.3 Out of the 40 mandatory training
categories, only 14 have achieved
a completion rate above 50%,
which is a significant concern given
the high number of medication
errors recorded in Q2 25–26. The
audit is of the opinion that training
compliance must be monitored
more rigorously to ensure staff are
equipped with the necessary
knowledge and skills to reduce
errors and maintain safe service
delivery.
4 Agreed action: 
Continue to ensure all staff
complete medication training and
competency assessments and
implement the medication
checklist to reduce errors. 
Agreed evidence:
Medication training and
competency records, checklist
implementation evidence, and
reports demonstrating reduction
in medication errors. 
N Gibson
Team Leader -
HART 
August
2026
Page 207 of 314

Page 208

26 
18 6.4.5 We noted that, on several
occasions, RIDDOR reportable
incidents were not submitted within
the statutory timelines required by
the HSE. In certain cases, reports
were submitted several months
after the incident occurred.
However, adherence to these
timeframes is essential to maintain
compliance and support effective
oversight of workplace health and
safety. 
4 Agreed action: 
• Reinforcement on Incident
Reporting training
• SHSCC reminded of
importance
• Health and Safety Team now
check absence dates, as over
7-day absences have been
the most problematic. 
Agreed evidence:
• Summary of incident reports
to HSE 
L Hamilton
Team Leader -
Health & Safety 
December
2026
19 6.4.6 Despite the continued efforts of the
H&S Team, in the consistent level
of reportable incidents observed
has highlighted the need for
stronger support and
understanding from all managers.
Without proper safety measures in
place, employees remain at risk,
insurance costs may rise due to
increased claims, and the council
faces potential harm to the public
as well as reputational damage. It
is therefore essential that
managers actively contribute to
targeted actions aimed at reducing
reportable incidents across the
organisation. 
3 Agreed action: 
Reinforce through the Strategic
Health and Safety Consultative
Committee (SHSCC) framework
and obtain active support from all
Service Managers to reduce the
number of reportable incidents. 
Agreed evidence:
Quarterly reports on incidents
G Boland
Strategic Lead –
Strategic
Planning,
People &
Performance 
L Hamilton
Team Leader -
Health & Safety 
August
2026
Page 208 of 314

Page 209

27 
20 6.4.9 Scottish Fire and Rescue Service
(SFRS) carried out 4 audits at
Council premises during 2025/26.
The SFRS also carried out 21
operational visits to domestic high-
rise properties. In our inquiry, it is
mentioned that H&S Team does
not monitor outstanding actions
from SFRS audit. They mentioned
that this information will be
available to the Head of
Establishment from each audited
property or to the Housing and
Repairs Team for domestic
premises. With the development of
Concerto these outstanding actions
will be signed off when the task is
completed. However, there is no
evidence on the completion of any
actions just now and there is no
one responsible person from the
H&S Team to follow up. 
4 Agreed action: 
Write to all Heads of
Establishment to remind them to
let the Health and Safety Team
know if they are being visited by
SFRS, and to share actions with
the Fire Safety Adviser.
Email Heads of Establishment
and ask them to update their
action plans and report when
actions are completed. 
Agreed evidence:
• Email correspondence
• Evidence on action
completion
L Hamilton
Team Leader -
Health & Safety 
December
2026
21 6.4.10 The auditor was informed that the
H&S Team carry out an annual
FRA review of all buildings with
sleeping accommodation such as
care homes and other buildings
with significant fire risks such as
Friarton Depot. Other premises
have their FRAs re-assessed at 24
months, 36 months, 48 months or
3 Agreed action: 
Check the work schedule to
ensure it is up to date. 
Agreed evidence:
Updated work schedule
L Hamilton
Team Leader -
Health & Safety 
August
2026
Page 209 of 314

Page 210

28 
60 months frequencies depending
on many factors. However, the fire
risk assessment schedule provided
is not completed and the re-
assessment frequencies have not
been set up properly for the many
of the properties. 
22 6.4.11 In relation to the Council
Headquarters at 2 High Street, a
new FRA was completed on 27
May 2026 following the significant
changes in layout and occupancy
during 2025. However, the
assessment identified that although
the overall fire risk is considered
tolerable, few high-priority actions
remain and several
recommendations from the
previous FRA (August 2023) have
still not been implemented.
Although fire drills were carried out
in March and May 2026, the
existence of outstanding and newly
identified issues indicates that fire
safety arrangements require further
strengthening to ensure full
compliance and effective risk
management. 
2 Agreed action: 
Property action:
• Awaiting costs from supplier
to undertake surveys for fire
doors throughout the building.
It should be noted the building
was fully refurbished and all
fire doors were replaced as
part of refurbishment.
• Other outstanding actions
which relate to fire stopping
will be reviewed by internal
architectural resources
following meeting on 8 June
2026 and a contractor will be
engaged in due course to
carry out necessary remedial
works.  
HoE action:
• Coordinate with Property
Service Team to ensure all
fire safety matters are
addressed collaboratively.
G Key  
Principal Officer
– Energy &
Engineering 
S Walker 
HoE, 2 High
Street, Perth 
December
2026 
January
2027
Page 210 of 314

Page 211

29 
• Complete the mandatory fire
safety self-assessment 
• Remove fire hazards such as
portable heaters, insecure
storage and poor
housekeeping practices within
the building.
• Strengthening the fire safety
management through
frequent checks, training and
record keeping
• Ensure high-risk areas are
secured and enforcing safe
working practices 
Agreed evidence:
• Completed Annual Self-
Assessment and schedule
• Next FRA to ensure previous
actions have been fully
completed
23 6.4.12 Regarding the Pullar house
building, the ownership has
changed in September 2025, and
the last FRA was dated 24 July
2024. In the FRA schedule it has
mentioned that the next FRA is due
in July 2026 and in our inquiry, it is
mentioned that there is ongoing
discussion with other users of the
building regarding next FRA.
2 Agreed action: 
On completion of the revised Fire
Strategy an updated FRA will be
put in place. Any actions arising
from the revised FRA will be
addressed by the HoE for Pullar
House. 
Agreed evidence:
Updated FRA in place
L Hamilton
Team Leader -
Health & Safety 
A Cook 
Service
Manager –
Contracts &
Facilities 
August
2026
Page 211 of 314

Page 212

30 
However, the FRA is yet to be
done. 
Page 212 of 314

Page 213

31 
11.  Authorisation 
11.1 The auditor for this assignment was D. Arachchilage. The supervising auditor
was J Clark.
This report is authorised for issue: 
12.  Distribution 
12.1 This report has been distributed to:
T Glen, Chief Executive
C Mailer, Depute Chief Executive
Z Robertson, Director/Chief Officer Perth & Kinross Health & Social care
Partnership
L Simpson, Strategic Lead - Legal & Governance 
S Walker, Strategic Lead - Finance and Business Support
E Ritchie, Strategic Lead - Housing & Communities
F Crofts, Strategic Lead - Environment and Infrastructure
A Singh, Strategic Lead - Children, Families and Justice
J Beveridge, Strategic Lead - Property Services
A Taylor, Strategic Lead - Customer and Digital Services
S Merone, Strategic Lead - Economy, Development and Planning
D Macluskey, Strategic Lead - Education and Learning
C Guild, Strategic Lead - Projects and Programmes
G Boland, Strategic Lead – Strategic Planning, People & Performance
P Johnstone, People & Culture Manager
L Hamilton, Team Leader- Health & Safety
G Key, Principal Officer – Energy & Engineering
A Cook, Service Manager – Contracts & Facilities
A Brown, Assistant Fleet Manager
N Gibson, Team Leader - HART
J McColl, Service Manager - Repairs & Improvements
N Taylor, Direct Services Manager
J Cassidy, Employee Engagement Officer
G Walker, Corporate Asset Management Officer
Committee Services
External Audit 
Page 213 of 314

Page 214

32 
13.  Assessment Definitions 
13.1 The following table contains the definitions of the control objective
assessment. 
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and control
exists, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in
the area audited.
Reasonable Assurance There is a generally sound system of governance, risk
management and control in place. Some issues, non-
compliance or scope for improvement were identified which may
put at risk the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were
identified. Improvement is required to the system of
governance, risk management and control to effectively manage
risks to the achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control is inadequate to
effectively manage risks to the achievement of objectives in the
area audited. 
13.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions. 
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations / major concerns which require
immediate action. Management will need to add these to the
appropriate Service risk register
Issue represents a control weakness which could cause, or is
causing, severe disruption of the process or severe adverse
effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of key
controls requiring urgent action. Management should consider
adding these to the appropriate Service / divisional risk
register
Issue represents a control weakness which could have, or is
having, major adverse effect on the ability to achieve process
objectives
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should
consider these when updating any divisional / team risk
registers
Issue represents a control weakness which could have, or is
having, significant adverse effect on the ability to achieve
process objectives
Page 214 of 314

Page 215

33 
2 Low Minor observations regarding the adequacy of controls which
require action to improve the efficiency, effectiveness, or
economy of operations or which otherwise require to be
brought to the attention of Senior Management
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process objectives
1 Trivial / Minor Very minor observations which will be raised during the audit
and may not be included within the final report
Issue represents a very minor control weakness with
negligible impact on the ability to achieve process objectives.
The issue will be raised during the audit and may not be
included within the final report. 
Page 215 of 314

Page 216

Page 216 of 314

Page 217

1 
Internal Audit Report
All Services
25-07 Insurance 
June 2026 
Final Report
(Report No. 26/195) 
Legal and Governance
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH 
10
Page 217 of 314

Page 218

2 
Contents by Section
1. Introduction
2. Executive Summary         
3. Audit Background Information        
4. Scope and Limitations         
5. Assessment of the Control Environment      
6. Summary of Findings         
7. Conclusions          
8. Acknowledgement         
9. Action Implementation & Follow Up     
10. Management Action Plan 
11. Authorisation
12. Distribution
13. Assessment Definitions 
Page 218 of 314

Page 219

3 
1.  Introduction
1.1 The audit of Insurance was undertaken as part of the Internal Audit Plan for
25/26, which was approved by the Audit & Performance Committee on 25
June 2025. The period under review for the purposes of the audit exercise
was financial years 2024/25 and 2025/26, however we used some data since
2022 for trend analyses and wider claims overview.
1.2 The indicative scope for the audit was to ensure the effectiveness and
compliance of insurance within the council.
1.3 This audit is not linked to any particular risk on the Strategic Risk Register,
however, forms the basis for internal assurance in accordance with the Global
Internal Audit Standards in the UK Public Sector.
2.  Executive Summary 
2.1 The audit has found that Substantial Assurance can be placed on the
Council’s internal controls in relation to the review of Councils’ Insurance
arrangements. Areas of good practice have been highlighted within Section 5
of this report.
2.2 There are 6 actions arising from the findings in Section 6. We note that the
service was aware of these and were taking action to address the issues,
where possible. These actions are suggested areas for improvement, where
collaboration with other services may further strengthen the insurance
arrangements. The action plan in Section 10 includes these actions which are
currently on-going to address the issues raised. 
3.  Audit Background Information 
3.1 Insurance is required as part of the Council’s statutory responsibility to
safeguard public funds and ensure continuity of services. Under the Local
Government (Scotland) Act 1973, Councils are entrusted with managing
assets, employees, and public services, which exposes them to financial and
operational risks. To meet these obligations and comply with sound financial
governance, Councils must maintain adequate insurance to protect against
liabilities such as property damage, employee injury, and third-party claims.
The Local Government (Scotland) Act 1973 requires the Council to have
proper arrangements in place for the administration of its financial affairs. 
3.2 Council have the authority to plan the need for statutory and additional
insurance protection based on the legal requirements, the risk exposures and
the level of insurance required to cover those risks that the Council cannot
self-finance. 
3.3 The Council’s insurance service is managed by Zurich Municipal PLC. The
Council must ensure that it has appropriate insurance in place to cover key
risks associated with its activities and responsibilities. Insurance is one of the
Page 219 of 314

Page 220

4 
main methods of transferring financial risk and is therefore likely to play a
significant role in the Council’s risk mitigation. If there is an inadequate
insurance coverage it can lead to significant losses and therefore highlights
the requirement to be included in the Annual Audit Plan.
3.4 Insurance premiums are unlike any other item of Council expenditure, in that
they are governed by the state of the insurance market which, in turn, is
governed by the effects of claims, national events and natural activities.
Council has statutory obligation as part of its internal activities to take Public
Liability (PL), Employer’s Liability (EL) Insurance and Motor insurance.
Furthermore, as part of additional services, provided by Council there are
Property, Travel (cover for schools and teachers for UK and abroad),
Community Insurance and Fidelity Guarantee Insurance cover.
3.5 As per our review, the Council has chosen to manage the risk by obtaining
insurance protection, where possible, with variable insurance excess policies,
depending on type of policy and risk. Additionally, and often seen as a
widespread practice among other authorities, Council manages an internal
insurance fund. The insurance fund still pays the excess amounts and covers
smaller claims, which overall, creates a balanced, cost-efficient risk strategy.
The total value of the insurance premiums payable for policies held for the
period 24/25 was £1,837,026 and for 25/26 is £2,179,332.
3.6 Assessing insurance risk and market conditions is complex and, in most
cases, requires specialist expertise to enable the Council to form an opinion.
As a result, this activity is outsourced to an external insurance broker,
arranging tailored insurance cover and act as a liaison between the Council
and insurers. The Council’s current broker is Gallagher. Gallagher also
provides claims handling support, which is a fee-based service charged in
addition to the insurance premiums. The appointment of the broker and
insurance provider is undertaken through a joint procurement exercise, with
contracts awarded for a three-year period and subject to annual review. The
current contract period covers 2024 – 2027.
3.7 Furthermore, the internal insurance team in Council is a team of two officers
and a management leadership team, which manage all transactional affairs,
communications between brokers and insurance providers. The team has
recently adopted a small transformation, aligning more closely operationally
with corporate asset management, which lays more closely with insurance
team’s tasks and work responsibilities. The team, monitors and coordinates all
claims, inputs the details to internal Figtree system (claims software) and
communicates between Council, Brokers and has full access to Zurich
Municipal PLC Council claims database.
3.8 The strategy for Internal Audit is to deliver a risk based Internal Audit service
by designing planned activity around the key risks to the Insurance
Management and Operational Controls. 
Page 220 of 314

Page 221

5 
4.  Scope and Limitations
4.1 The Audit has reviewed the appropriate use of the insurance policy and its
renewal, including the adequacy of the cover, managing and recording of
claims, prevention and monitoring, as well as third party cover.
4.2 To arrive at an opinion on the achievement of the control objectives, the
review included:
• Gathering information from published regulations and governance
guidelines.
• Validated the operational process against the published standard
operating policy and internal procedures.
• Interviews and review of documentary evidence.
4.3 There were no limitations identified that would impact the Audit, which
concentrated on the control environment for managing insurance risk. We did
not verify the accuracy of the detailed records of claims and the journal entries
logged in the Figtree system, used for internal claims records management. 
4.4 Furthermore, we have not duplicated work undertaken by External Audit as
part of their annual audit. 
4.5 The details of the control objectives reviewed and Internal Audit’s assessment
of their strength of control in each area is contained within Section 5 of this
report.
5.  Assessment of the Control Environment 
5.1 The table below contains a summary of the number of findings and their
ratings, as detailed in Section 12, against each control objective, along with
Internal Audit’s assessment of the adequacy and effectiveness of the controls
in place to meet each of the objectives agreed for this audit. Further details,
including any improvement actions, are set out in the Management Action
Plan in Section 10.
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1  To ensure that there is adequate
insurance in place for the council to
cover its governance requirements. 
1 3 Substantial
Assurance
2  To ensure that the effectiveness and
efficiency of the insurance process and
that claims processes are dealt with
promptly; including Trend analysis,
improvement and preventative measures
applied, where applicable  
1  1 Substantial
Assurance
3  To ensure that there is a sound
coordination of services, guaranteeing    
1 Substantial
Assurance
Page 221 of 314

Page 222

6 
immediate risk areas are evaluated,
covered and minimising the duplication
of efforts. 
5.2  The auditor has assessed that Substantial Assurance can be placed on
controls overall in relation to the arrangements for Insurance Cover for Perth
and Kinross Council. Meaning:
“A sound system of governance, risk management and control exists, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited”.
5.3  A summary of the key findings and actions is provided in section 6. Please
note, however, the following areas of good practice which have been
highlighted during the audit:
5.3.1 As part of the assurance process within the insurance team, we reviewed the
team’s tasks and potential risk of claims being delayed, unpaid and
unadministered, which could potentially cause not only reputational damage
but also risk of financial losses. The auditor would like to highlight the positive
collaboration and immediate response from the insurance team, during the
review process. The officers were not only, fast and supportive in their areas
of work but also shown full knowledge and awareness of each other’s
responsibilities. 
5.3.2 The Insurance team promptly and efficiently supports other Council functions,
such as preparing detailed monthly reports to fleet for management review
and regularly scheduled reports for Executive Leadership Teams (ELT) and
responding swiftly to information requested under Freedom of Information
(FOI) legislation.   
5.3.3 All Policies (Public Liability, Employers Liability, Motor, Property, Business,
School Travel and Fidelity) are in place and updated from July each year, to
be active for 31 October. Auditors have reviewed that there is sufficient
information gathered at the end of each financial year, to support all required
decisions regarding any update to the renewal of policies. We can confirm
that all Policies run concurrently ensuring no gaps in insurance. 
5.3.4 It is a requirement for local authorities to take security against the
infidelity of officers whose duties involve the custody and control of money.
The Local Government Act from 2003 and Local Government Act 1973
reaffirms this, as part of the framework of duty to secure Best Value; this is
the modern insurance equivalent of “security” and covers losses caused by
employee fraud or dishonesty, which Policy runs and is in place at the same
times as the rest of the Insurance covers. 
5.3.5 The auditor has verified that monthly claims reviews, meetings, and
communications between Council insurance team, brokers, and insurers have
taken place. During the audit period (Nov’ 25- March ‘26) we took samples of
public liability, motor, and employers’ liability claims, which represents a 10%
from the annual volume. Each claim was processed, validated, and
Page 222 of 314

Page 223

7 
acknowledged in line with established procedures before being passed to the
insurer. Insurance officers presented extremely detailed information being
held on each claim throughout its lifecycle. During the timeframe validation,
the auditor randomly selected examples of 3 claims from each policy and all
were closed and completed within 3-4 months from the receiving date. 
5.3.6 Council Insurance officers use Figtree system to record and manage all claim
details. Figtree is a procured software that contributes to efficient claims
management, as seen with recent improvements introduced to GDPR
functionality designed to protect claimant data, improve the control
environment and demonstrate wider compliance. The use of the Figtree
system strengthens Councils Insurance Team arrangements and provides
effective support and maximises data control over claims management.   
5.3.7 Gallagher is an external insurance broker providing specialist expertise,
access to wider insurance markets and competitive premiums. The broker
provides recommendation to Council on insurance risks and current market
trends. Brokers support tendering, gives independent advice on cover gaps,
and supports the Council with claims handling and risk analysis. The
externally outsourced broker is visibly beneficial for the Council Insurance
team’s workload and not only reduces claims process pressure, it also helps
to ensure the Council has appropriate, proportionate, good value insurance
cover. Gallaghers position is advisory and does not carry the risk, this lays
completely over the insurance provider Zurich. 
5.3.8 Whilst Gallagher provides a brokerage cover, the auditor confirmed that the
firm’s services has been tendered prior to contracting, to do Actuarial
Valuation report. The report supports to reevaluate and affirm the size of
Council Insurance’s Fund, using the Council’s data for the last 10 years.
Obtaining the report prior to tendering for the 2024 insurance contract,
improves the accuracy of premium calculations and strengthens data driven
analysis. Additionally, our observations confirm that Gallagher have used two
of the most used methodologies: chain ladder and Bornhuetter-Ferguson
actuarial methods for assessment and provide Council leadership with
accurate information in support their budget and risk management. 
5.3.9 Property has the highest value of assets and therefore risks are highest in
Premiums and excess cover. Our observations confirmed that Insurance
officers add newly acquired properties promptly onto a monthly monitoring
sheet, which is communicated directly with the insurer, Zurich M. The Auditor
reviewed the inventory records across Motor, Property and IT and confirmed
the total value cover held in each service corresponds to the information held
from insurance team.  Council officers have up to date information and there
is no gap or misalignment between value of assets and insurance cover. A
noticeable improvement was evidenced in ongoing work, where insurance
officers can now directly access the database system of the property services,
which saves time, improves accuracy and miscommunication between
different departments. 
Page 223 of 314

Page 224

8 
5.3.10 Moreover, during the audit, it was noted that the realignment of functions
between strategic portfolios, with the Corporate Asset Management Officer
having overall responsibility for the Insurance team, has been beneficial for
the team. This change in position will enhance the development of asset
management knowledge within the Insurance team’s operations. The role has
already brought wider knowledge of internal asset management systems and
improved understanding of data flows and communication across services.
Overall, this development will support more streamlined control environment
and contribute to improved operational efficiency within the Insurance
function. 
5.3.11 To affirm the up-to-date value of Council properties, the Central Service
Manager completes an annual review of Index Linking the value of the
properties in line with inflation. A positive observation was seen in addition to
this; in 2024 the Insurance team has assigned a specific request to an in-
house surveyor. A report was created for a specialist Valuation exercise to all
Council buildings, to affirm the most accurate valuation, reflecting local market
value of housing as well as tailored cost per building (Concert Halls, Schools
etc.), to create a detailed knowledge and form the most accurate insurance
cover. 
5.3.12 During auditor’s assessment we included a sample test, against failure of
service of areas or delay in informing the insurance office of new assets
requiring insurance. Instead of insuring individual items for damage and
accidental cover, 10% of the building’s insurance is allocated to contents. Our
samples included a higher claim, with material value (over £5000), caused by
a storm damage on Coupar Angus Primary School in January 2024. The
review of documents and settlement of the claim confirmed that the insurance
has been efficient to cover all the contents. 
5.3.13  As part of the wider scope on high value dispute claims, such as the fire at
the former Balhousie Primary School, we confirmed the involvement of loss
adjustors in overseeing such claims. Loss adjusters are appointed by insurers
for high‑value or complex claims to provide an independent, expert
assessment that ensures accurate, fair, and efficient claim resolution. 
5.3.14 Council insurance manual, forms and related policies are populated on the
Council’s intranet widely and easily accessible from the employees, when
necessary. Auditors have confirmed efficient flow of information and Fleet
Management receives a monthly summary of driver reported claims. In
addition to validating insurance requirements for fleet and leased vehicles, a
monthly claim analysis is conducted to strengthen responsibility and reduce
recurring incidents. Where necessary, this is reflected on disciplinary action
log. 
5.3.15 Accountability and monthly analysis are additionally evident in the ongoing
work between Property Services and other departments. A shared monitoring
project sheet is used to track actions aimed at preventing future claims,
particularly through improved property maintenance feedback and their link to
public liability claims.
Page 224 of 314

Page 225

9 
5.3.16 An analysis of the highest monthly claims is considered by Council Chief
Finance Officer on regular basis, which additionally affirms control over future
expenditure and awareness over Strategic Leadership Teams. 
6.  Summary of Findings 
6.1 Below is a summary of key findings and actions, which are reflected in the
Management Action Plan, detailed in section 10. 
6.2   Inadequate Insurance Policies to cover Council’s requirements. 
6.2.1 Although all Insurance policies run continuously, the review of the Internal
Council documents shows that the new policies cover and excess cover are
not reflected on the Insurance manual, and the contact’s name is not updated
reflecting the newly assigned insurance team leader. There are out-of-date
contact names on the internal procedure document. Additionally, publication
and future review date is missing whatsoever.
[Action Point 1]
6.2.2 Further to our review, there was a mismatch of the excess cover on the Zurich
Insurance Certificate of £157,500 to the actual figure of £150,000, on the
internal Council systems.
[Action Point 2] 
6.2.3 Council Strategic Risks are covered and considered, where possible to apply
insurance cover, ensuring that management is responsible for insurance as
part of Senior Leadership Team/ management budget meetings. As part of
reviewing process and overall management understanding, it could be
beneficial to have an up-to-date Risk mapping. 
Furthermore, including insurance as a control within the strategic and
operational risk registers would provide clearer assurance on how the Council
mitigates the financial impacts of key strategic risks, supporting a more
accurate view of overall risk mitigation. As the Council already oversees these
risks through existing insurance arrangements, incorporating insurance under
the control section of the risk register would strengthen the completeness of
the risk assessment documentation.
[Action Point 3] 
6.2.4 From our review of the insurance documents, we observed that assets are
continuously updated throughout the year, where insurance team receives
home report valuations from Housing Team, as additional properties come to
Council ownership. However, for insurance purposes there is a requirement to
have the reinstated value for each property, which is usually higher than the
Page 225 of 314

Page 226

10 
home report. Missing that detail of information, may affect the insurance
protection and potential dispute on claims. Although, this observation has
already been already highlighted from the broker, Gallagher to Council, we
have not seen consistent incoming records, ensuring reinstated value for all
properties is added from start. 
[Action Point 4] 
6.3 To ensure that the effectiveness and efficiency of the insurance process
and that claims processes are dealt with promptly; including Trend
analysis, improvement and preventative measures applied, where
applicable. 
6.3.3 Internal software Figtree is an effective database system used to collect,
manage and monitor claims. While all information is up to date, we have
noticed that the new change and restructuring of services in the Council in
2024 has not been reflected. (E.g. Education and Children Services is now
Education & Learning and Children, Families & Justice), could lead to
incorrect future internal service analyses. 
[Action Point 5] 
6.3.4 During the assessment process, we identified that Insurance team, prepares
monthly and annual reports on high value claims, including high- cost open
unsettled claims, which get submitted to Service Leaders, as well as Council
Financial Officer. 
However, there was no evidence on trend analyses and oversight of how
claims evolve over a period. Having a longer period analysis over claims
graph-based patterns, values and root cases graphs can provide valuable
overview that supports management to take stronger evidence-based
decisions, implement actions plans and strengthen financial resilience. 
Page 226 of 314

Page 227

11 
£0.00
£50,000.00
£100,000.00
£150,000.00
£200,000.00
£250,000.00
0
100
200
300
400
22/23 23/24 24/25
PL & El Trend Analysis 22-25 Council Insurace
Financial Years
Number of Claims received
Number of claims paid
0
10000
20000
30000
40000 22/23 PL & El Settled Claims
0
5000
10000
15000
20000
25000
30000
35000
23/24 PL & El Settled Claims
Page 227 of 314

Page 228

12 
Above is a sample of visual graph suggestions, prepared by the auditor,
representing the volume of incoming claims (Public and Employers Liability).
By having a visual information, we can clearly monitor to number of claims
coming to the team over the last 3 years, against the actual settled and closed
claims. 
Although, insurance claims are inherently volatile and often event‑driven,
trend analyses remain strategically valuable, providing support for informed
governance, financial resilience and risk-based decision. Even where claims
volumes can vary from year to year, we can highlight systematic exposure
rather than isolated events.
[Action Point 6] 
6.4 To ensure that there is a sound coordination of services, guaranteeing
immediate risk areas are evaluated, covered and minimising the duplication
of efforts. 
6.4.3 Even though, quarterly meetings take place between teams, there is scope for
further improvement. The insurance team still requires access and training to
use Housing Asset Management software. Having direct access and
knowledge would reduce delays in response, confirm the improvements are
made and what actions are currently being taken. 
[Action Point 7]
7.  Conclusion
7.1  The Internal Audit review is able to place Substantial Assurance on the overall
control environment for the Insurance arrangements in place. The agreed
actions, once implemented, should enable Internal Audit to place Substantial
assurance on these.
0
5000
10000
15000
20000
25000
30000
24/25 PL & El Settled Claims
Page 228 of 314

Page 229

13 
8.  Acknowledgements
8.1  Internal Audit would like to thank all officers who were involved in this audit,
particularly officers within the Insurance team in Asset management.
9.  Action Implementation & Follow up
9.1  Responsibility for the maintenance of adequate and effective controls rests
with management. Where the audit has identified areas for management
action, these are identified in the Management Action Plan. Where a decision
is taken by management not to act in response to finding from this review, it is
the responsibility of management to assess and accept the risk arising from
non-implementation.
9.2  Achievement of the agreed actions is monitored through Internal Audit’s
‘follow up’ arrangements. 
Page 229 of 314

Page 230

14 
10.  Management Action Plan 
Action
Point
Para.
No Finding Risk
Rating Agreed Action & Evidence Action Owner Completion
Date
1  6.2.1 Although all Insurance policies run
continuously, the review of the
Internal Council documents shows
that the new Policies cover and
excess cover are not reflected on
the Insurance manual, and the
contact’s name is not updated
reflecting the newly assigned
insurance team leader. There are
out-of-date contact names on the
internal procedure document. 
Additionally, publication and future
review date is missing whatsoever 
1
Agreed action:
Update designations and names on
Council Insurance Manual 
Agreed evidence: 
Updated Insurance Manual 
G Walker
Corporate
Asset
Management
Officer 
Completed 
2  6.2.2 Further to our review, there was a
mismatch of the excess cover on
the Zurich Insurance Certificate of
£157,500 to the actual figure of
£150,000, on the internal Council
systems.
1 Agreed action:
Update Zurich PLC to amend policy
certificate accordingly. 
Agreed evidence:
Updated Policy reflecting excess
cover
D McRobbie
Insurance
Officer 
L Hay
Insurance
Officer
Completed. 
Page 230 of 314

Page 231

15 
3  6.2.3 Furthermore, including insurance
as a control within the strategic
and operational risk registers
would provide clearer assurance
on how the Council mitigates the
financial impacts of key strategic
risks, supporting a more accurate
view of overall risk mitigation. As
the Council already oversees
these risks through existing
insurance arrangements,
incorporating insurance under the
control section of the risk register
would strengthen the
completeness of the risk
assessment documentation.
2 Agreed action:
Include Insurance in Internal Controls
for Annual Strategic Heatmap Report. 
Agreed evidence:
1. Meeting Minutes
2. Heatmap Report
G Walker
Corporate
Asset
Management
Officer
Service
Managers
S Walker
Chief
Financial
Officer
December
2026
4  6.2.4 However, for insurance purposes
there is a requirement to have the
reinstated value for each property,
which is usually higher than the
home report. Missing that detail of
information, may affect the
insurance protection and potential
dispute on claims. Although, this
observation has already been
already highlighted from the
broker, Gallagher to Council, we
have not seen consistent incoming
1 Agreed action:
Include reinstated value of properties
at the time of purchase. 
Agreed evidence:
Council Insurance team Property
sheets completed with reinstated
value at time of purchase.
Property
Services 
Buyback
Team 
H Hatfield
Project Officer
Communities 
N Sworowski
Place
Strategies
Completed 
Page 231 of 314

Page 232

16 
records, ensuring reinstated value
for all properties is added from
start.
Manager &
Chief
Planning
Officer
5  6.3.3 While all information is up to date,
we have noticed that the new
change and restructuring of
services in the Council in 2024
has not been reflected. (E.g.
Education and Children Services
is now Education & Learning and
Children, Families & Justice),
could lead to incorrect future
internal service analyses.
1 Agreed action:
Populate Figtree software with the
up-to-date names of services
accordingly. 
Agreed evidence:
Reports, showing current
department names
D McRobbie
Insurance
Officer 
L Hay
Insurance
Officer 
G Walker
Corporate
Asset
Management
Officer
April 2027 
6  6.3.4 There was no evidence of trend
analyses and oversight of how
claims evolve over a period.
Having a longer period analysis
over claims graph-based patterns,
values and root cases graphs can
provide valuable overview that
supports management to take
stronger evidence-based
decisions, implement actions
plans and strengthen financial
resilience.
3 Agreed action: 
Consider monthly/ annual trend
analyses reports submitted to ELT &
SLT. 
Agreed evidence: 
D McRobbie
Insurance
Officer 
L Hay
Insurance
Officer 
July 2026
Page 232 of 314

Page 233

17 
7  6.4.3 Even though, quarterly meetings
take place between teams, there
is scope for further improvement.
The insurance team still requires
access and training to use asset
management software. Having
direct access and knowledge
would reduce delays in response,
confirm the improvements are
made and what actions are
currently being taken. 
1 Agreed action:
• Training of Housing System
(NEC).
• Allow Access of Insurance
Team for visibility of Property
Software. 
Agreed evidence:
• Insurance Team access and
knowledge of accessing NEC
Housing System.
• New member agreed training.
A Magee
Systems
Development
Officer 
September
2026
Page 233 of 314

Page 234

18 
11.  Authorisation 
11.1 The auditor for this assignment was T Philip. The supervising auditor was D
Arachchilage.
This report is authorised for issue: 
12.  Distribution
12.1 This report has been distributed to:
T Glen, Chief Executive
C Mailer, Depute Chief Executive
E Ritchie, Strategic Lead – Housing & Communities
S Marone, Strategic Lead – Economy, Development & Planning
S Walker, Strategic Lead – Finance & Business Support
J Beveridge, Strategic Lead – Property Services
A O'Brien, Finance Manager/Business Partner
G Walker, Corporate Asset Management Officer, Communities - Capital
Investment & Asset Management
L Hay, Corporate Insurance & Claims Officer
D McRobbie, Corporate Insurance & Claims Officer
Committee Services
External Audit 
Page 234 of 314

Page 235

19 
13.  Assessment Definitions
13.1 The following table contains the definitions of the control objective
assessment
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and control
exist, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in
the area audited.
Reasonable Assurance There is a generally sound system of governance, risk
management and control in place. Some issues, non-compliance
or scope for improvement were identified which may put at risk
the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk
management and control to effectively manage risks to the
achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control is inadequate to
effectively manage risks to the achievement of objectives in the
area audited. 
13.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions.
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations/ major concerns which require
immediate action. Management will need to add these to the
appropriate Service risk register.
Issue represents a control weakness which could cause, or is
causing, severe disruption of the process or severe adverse
effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of key
controls requiring urgent action. Management should consider
adding these to the appropriate Service/ divisional risk register
Issue represents a control weakness which could have, or is
having, major adverse effect on the ability to achieve process
objectives
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should
consider these when updating any divisional / team risk
registers
Page 235 of 314

Page 236

20 
Issue represents a control weakness which could have, or is
having, significant adverse effect on the ability to achieve
process objectives
2 Low Minor observations regarding the adequacy of controls which
require action to improve the efficiency, effectiveness, or
economy of operations or which otherwise require to be brought
to the attention of Senior Management
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process objectives
1 Trivial / Minor Very minor observations which will be raised during the audit
and may not be included within the final report
Issue represents a very minor control weakness with negligible
impact on the ability to achieve process objectives. The issue
will be raised during the audit and may not be included within
the final report. 
Page 236 of 314

Page 237

1 
Internal Audit Report
Housing & Communities 
24-04 Affordable Housing
June 2026 
Final Report
(Report No. 26/196) 
Legal and Governance
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH 
11
Page 237 of 314

Page 238

2 
PK 24-04 Affordable Housing
Contents by Section 
1. Introduction
2. Executive Summary         
3. Audit Background Information        
4. Scope and Limitations         
5. Assessment of the Control Environment      
6. Summary of Findings         
7. Conclusions          
8. Acknowledgement         
9. Action Implementation & Follow Up     
10. Management Action Plan 
11. Authorisation
12. Distribution
13. Assessment Definitions 
Page 238 of 314

Page 239

3 
1.  Introduction 
1.1  The audit of PK 24-04 Affordable Housing was undertaken as part of the
Internal Audit Plan for 2024/2025, which was approved by the Audit &
Performance Committee on 24 June 2024. The period under review for the
purposes of the audit exercise was financial years 2024/2025. 
1.2  The indicative scope for the audit was to review the arrangements in place for
the Affordable Housing Strategy included in the Internal Audit Plan for 2024/25.
1.3  This audit is linked to the Strategic Risk Register SRCP-004 and SRCP-010,
SRCP-004 states that ‘Our actions to tackle poverty and address the
inequalities gap within Perth & Kinross are ineffective’ and this is rated as Very
High Risk, priority 1. SRCP-010 refers to ‘Council buildings and other assets
that are not safe, fit for purpose or providing the best value’ and it was reported
to be priority 2, as High risk for both. 
2.  Executive Summary 
2.1  The audit has found that reasonable assurance can be placed on the Council’s
internal controls in relation to the arrangements in place to support delivering
the Affordable Housing plans of the Council.  
2.2  There are nine actions arising from the findings in Section 6. An action plan is
included in Section 10. Once these actions are completed, Internal Audit should
be able to place substantial assurance on the arrangements in place. 
3.  Audit Background Information 
3.1  Affordable housing delivery refers to the strategic process of planning,
constructing, and providing housing options that are financially accessible to
individuals and families with low to moderate incomes. The Scottish
Government has several initiatives and fundings for affordable housing, which
have a direct impact on Perth and Kinross Council. Each local authority has a
responsibility to develop and implement strategic housing plans that outline
their priorities and targets for delivery. 
3.2 Based on the requirement, Perth and Kinross Council’s Strategic Housing
Investment Plan (SHIP) 25-30 is developed to align with the priorities and
outcomes set out in the Local Housing Strategy (LHS) 22-27. This ensures that
the investment in affordable housing supports the broader housing goals of the
local authority. The SHIP provides a detailed plan for the delivery of affordable
housing projects, including timelines, funding allocations, and resource
planning. 
3.3 The SHIP 25-30 aims to deliver 1,152 affordable homes over the five-year
period committed 210 per year according to LHS. Affordable housing within the
SHIP includes variety of initiatives such as new build projects, refurbishment
Page 239 of 314

Page 240

4 
and renovation projects, regeneration projects, off the shelf acquisitions and
buybacks. Responsibility for Affordable Housing spreads across three Strategic
Lead Areas Economy, Development & Planning; Housing & Communities; and
Property. 
3.4  The PKC Corporate Plan 22-27 explains our vision and priorities. As part of the
strategic approach, Appendix 1 contains a list of priorities and the Local
Housing Strategy is one of them, which is designed in alignment with Scottish
Government strategy Housing to 2040. PKC Risk Register lists the PKC Local
Housing Strategy (LHS) 2022-27 as a control to mitigate the risk, however, it
states that the ‘control effectiveness’ as ‘improvement required’. 
4.  Scope and Limitations 
4.1 The review consisted of identifying measures are in place to ensure the efficient
and effective key controls operating around delivering against all aspects of
affordable housing targets according to the LHS and Strategic Housing
Improvement Plan (SHIP). It is acknowledged that responsibility in this area
spans 3 Strategic Lead areas, namely Economy, Development & Planning;
Housing & Communities; and Property. To arrive at an opinion on the
achievement and transparency of the control objective, the review included:
• Document review in relation to the LHS and SHIP.
• Interviews with key staff who are responsible for LHS and SHIP
• Analysis and review of the effective delivery of Monitoring and Progress and
implementation of the LHS and SHIP.
• Review of any third-party arrangements (financial, process and
communication) 
4.2 The focus of the Internal Audit has been on ensuring that the overall plans of
PKC for affordable housing delivery are in place and of the arrangements in
place for the monitoring and reporting of performance for all partners in
delivering affordable housing. However, the audit did not assess the status of
individual projects assigned to RSL housing providers, as the delivery of their
building projects is the responsibility of the relevant Housing Associations. 
4.3 Internal Audit recognised that a big part of the Action Plan for delivering the
LHS target will be out with the control of the Council and that funding for the
future planning period within the LHS required from Scottish and/or UK
Government may not be forthcoming.  
4.4  The details of the control objectives reviewed and Internal Audit’s assessment
of their strength of control in each area is contained within Section 5 of this
report. 
Page 240 of 314

Page 241

5 
5.  Assessment of the Control Environment 
5.1  The table below contains a summary of the number of findings and their ratings,
as detailed in Section 12, against each control objective, along with Internal
Audit’s assessment of the adequacy and effectiveness of the controls in place
to meet each of the objectives agreed for this audit. Further details, including
any improvement actions, are set out in the Management Action Plan.
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1 To ensure that the LHS delivered
through SHIP is achievable, there is
no risk of failing delivery of the plan
of providing more affordable homes
to support liveable places of
average 210 homes per year over 5-
year period.  
2 4 3 Reasonable
assurance 
5.2  The auditor has assessed that reasonable assurance can be placed on controls
overall in relation to Affordable Housing plans of the PKC. Meaning:
‘There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited.’
5.3  A summary of the key findings and actions are provided in section 6, please
note however, the following areas of good practice which have been highlighted
during the audit:
5.4  The Council has created a dedicated Strategic Affordable Housing Strategy
Board (SAHB) where meetings are recorded and discussions cover all aspects
of the PKC SHIP, including newbuild projects through Housing Associations.
There is an average of 5 meetings per year, which are focused as per the group
remit objectives. Topics cover project progress, planning updates, current and
potential future opportunities with well monitored financial and timeline
structure. SHIP and LHS projects have clearly set targets allocated in the LHS
Action Plan 2022-2027, where in addition to the yearly updates, there are
additional quarterly performance updates, accessible to the public on Council’s
webpage. 
5.5 SAHB consists of proactive members and considers utilising flexible housing
funding options to deliver the SHIP. From the reviewed resources there was
visible spend in the following areas: £1.5 million from Developer Contributions
to assist in delivering affordable housing initiatives throughout Perth and
Kinross including new build houses in Kinross; delivery of £4m in funding from
Scottish Government’s Gypsy/Traveller Accommodation Fund at the Double
Dykes site to replace 20 chalets, utilising £700,000 from the second home
Council tax income towards purchasing twenty National Trust buildings in
Page 241 of 314

Page 242

6 
Dunkeld; as well as utilising the major funding through prudential borrowing via
the Housing Revenue Account (HRA) as evidenced in the delivery of the last
phase of 5 modern homes in Methven and few more as per SAHB plan. 
5.6  The assigned Team Leader, Affordable Housing Strategy and connected team
members, have in depth and broad knowledge of the government requirements
of delivery of affordable housing. This was visible, through well organised
delivery plans and implemented communication flow, internally between
departments and externally, through Housing Associations, including to the
Housing Regulator and Scottish Government. PKC Affordable Housing
Strategy Team updates the yearly plan (SHIP), which is annually approved and
continuously reviewed between PKC and Scottish Government, as observed
on the received Resource Planning Allocation letter (RPA), September 2024.
The RPA confirms the allocated funding for 2025-26. It should be noted that
while the overall SHIP covers a five-year period, the specific funding allocations
within the RPA can be adjusted and confirmed only for that year. 
5.7 Considering the limited confirmation of future government funding, which is out
of the audit scope, it is observed through compelling evidence that PKC is
committed to the delivery of the SHIP. As a result, if a delay in new builds
occurs, PKC can react promptly and fulfil the annual affordable housing target
quantities, through quick response with the well- established Affordable
Housing Strategy Team. 
5.8 The latest Strategic Housing Investment Plan (SHIP) for 2025/26 forms the
basis of the plan to deliver the affordable housing of overall £87
million investment. It includes the delivery of 1,152 homes, which has a
significantly higher investment than the previous SHIP 2024-29 with a target of
delivering 1,435 homes. The latest SHIP 2025-30 has an increased target with
already incorporated modern design standards, focusing on higher quality and
more complex projects with expanded scope, such as sustainability and energy
efficiency. 
5.9 The reviewed evidence presents a greater programme performance in 2024/25
than the previous year’s delivery, due to exceeding the target of buybacks; as
of March 2025, the data showed that there was a total of 238 additional
affordable housing units against a projection of 223, compared to a total of 170
additional affordable housing units against a target of 210 in 2023/24.   
5.10 The associated finance team members within SAHB, demonstrate well-
established practices through the overall Capital Financial Monitoring Plan; this
confirms projects match the SAHB plan. Capital planning includes close
monitoring of all undergoing RSL projects with PKC involvement as well as
additional future projects. The SAHB Monitoring Projects Plan indicates a clear
view of how current or future projects could potentially affect the budget plan.
During the interview with the Finance Team Leader, we observed lessons learnt
over the years in adapting the capital budget and expenditure. Current
monitoring sheets reflect more accurately this adaptability in relation to
additional affordable housing projects, as shown in the approach to progressing
buybacks. Before reaching for PKC prudential borrowing to purchase buybacks
over the agreed target, there is communication with the Scottish Government
Page 242 of 314

Page 243

7 
to consider the potential of using the SHIP’s funding. The agreement to proceed
with additional buybacks subsequently supports the meeting of the overall
yearly SHIP targets. In March 2025, the buybacks properties totalled 116, in
comparison to the previously expected 40 properties; this has maximised the
use of the available budget and has supported the overall annual additional
affordable housing units set out in the SHIP for 2024/25. 
5.11 All updates regarding acquiring any property as part of the PKC stock is
communicated between Economy, Development & Planning; Housing &
Communities; and Property, which is then subsequently reflected on their
databases. Approval to proceed above the agreed target of 40 is also discussed
and agreed at regular SAHB meetings and at regular Housing Management
Team meetings. 
5.12 An initiative-taking approach to identifying and addressing additional potential
projects, which are suitable for the Council needs and where the Council can
increase housing quantities to meet the housing needs and reach the annual
PKC target, has been observed. Team officers are working with external
agencies and housing associations to find more flexible and creative options to
obtain additional stock. We can evidence that through the variety of projects
discussed in the SAHB meetings. 
5.13  PKC demonstrates strong tenant and community involvement, following a
consultation with over 3000 responses with the latest tenancy increase
proposals. The latest approved Housing Revenue Account (HRA) Strategic
Financial Plan 2025-2030 presented at the Housing and Social Wellbeing
Committee on 22 January 2025, agreed a 6% increase on the rent-setting for
Council social housing tenants. The income from the rent increase will continue
to support the buyback funding of £20m over 5 years and addresses the
Council’s active approach of addressing funding options for financial
sustainability of the affordable housing projects. 
5.14 We have observed that PKC manages the above Affordable Housing projects
accurately. An effective method for implementing a strong plan is to create
focused responsibilities. This group’s focus is on detailed review on new build
projects, matching latest standards and housing requirements, reflecting good
practices. This has been reflected in the formation of the PKC New Builds Team
meetings in autumn 2023, which collaborates closely with related parties
Finance, Legal, Procurement, Property and Economy, Development &
Planning. 
6.  Summary of Findings 
6.1  Below is a summary of key findings and actions, which are reflected in the
Management Action Plan, detailed in section 10. 
6.2  Strategic Affordable Housing Board (SAHB) 
6.2.1 The SAHB oversees the implementation of the Strategic Housing Investment
Plan (SHIP). During document review, it was noticed that the buyback
Page 243 of 314

Page 244

8 
quantities for September 2024 of the legal team were much higher than listed
on the SAHB plan (40 against the actual 90). The total estimated expenditure
figure on buybacks was not reflected as the number of properties increased.
Although not all buyback properties are funded through the SHIP, all the
purchased quantities can be reflected in the planning sheet to increase the total
number of affordable housing units against the target for PKC. At each SAHB
meeting the total buyback quantity increased from 40, to 64, then to 90,
however this change was not reflected in the total projected spend column in
the SAHB spreadsheet.
[Action Point 1]
6.2.2 In our observation of the SAHB meetings minutes are recorded, however the
discussions blend in with the action points. There is no further clear outcome
and separate follow up Action Plan.  This could result in some action points
remaining unaddressed. Clearly defined actions with designated responsible
persons and timelines would assist in leading to clearer responsibilities. 
[Action Point 2]
6.2.3. We acknowledge that although there is strong control of affordable housing
delivery through SAHB, a clear flow outlining each delivery group and its
responsibilities within and exactly which areas are being covered in the delivery
plan, is not evident. The responsibilities between Property, Economy,
Development & Planning and Housing & Communities are very closely related.
There is a risk of misalignment between the groups, which may result in
conflicting information and inefficiencies during decision-making processes,
and ultimately delivery of outcomes, especially during acquiring new build
properties.
[Action Point 3]
6.2.4 While we recognize the importance of evaluating the PKC New Build Delivery
Group’s performance, we believe it is too soon to draw definitive conclusions at
this stage.   
6.3 Processing Buyback Properties
6.3.1 Affordable housing, particularly the buybacks programme, is delivered through
plans with specified quantities of properties. The buybacks process of acquiring
each property includes different departments, before it becomes part of PKC
stock. It was observed lack of transparency of upcoming plans between
buybacks in Property Team and paralegal team. Each team had their own
stand-alone records with no shared access of other team’s progress. Shared
detailed information or access to upcoming work can improve on wider team’s
planning schedule.   
[Action Point 4]
6.3.2  It was noted that the meetings between Property buybacks team and paralegals
were not regular and not recorded. Structured plan with feedback from both
departments working in collaboration, can improve efficiency in delivery of the
Page 244 of 314

Page 245

9 
Affordable Housing Plan and reduce potential delays during conveyancing
process.
[Action Point 5] 
6.3.3   Currently, the property criteria of buybacks are quite generic when submitting
to paralegals for an offer letter to be sent out. We understand that detailed
information for each property can be added during the assessment process
from the initial viewing. All the unique applicable information can be reflected to
its acquisition form for use of the paralegal team. All additional information can
expedite the conveyancing process by reducing the need for feedback at a later
point.
[Action Point 6]
6.3.4 The buyback policy for processing properties will need to be optimized and
further developed. This should include purpose, scope, responsibilities,
procedures, and compliance measures, approved by, date of issue and last
revision.  Strong and clear instructions, formalised within the PKC template, will
ensure quality assurance in the process. 
[Action Point 7]
6.3.5  Conveyancing process can be lengthy with various bottleneck points occurring
during legal work. We acknowledge the experience of the paralegal team,
however lessons learned practises during conveyancing are not captured. A
database of past issues serves as a valuable information resource for future
training and educating of the wider paralegal team.
[Action Point 8] 
6.3.6  The paralegal team involved in the buyback process is experienced and
efficient, using well-established work routine and process. However, the steps
of the conveyancing process are not captured and reflected directly on a
process-based sheet or work instruction.
[Action Point 9] 
7.  Conclusion 
7.1  The Internal Audit review can place reasonable assurance on the overall control
environment for the delivery for the affordable housing plans of the Council. The
agreed actions, once implemented, should enable Internal Audit to place
Substantial assurance on these. 
8.  Acknowledgements 
8.1  Internal Audit would like to thank all officers who were involved in this audit: 
N Sworowski, Place Strategies Manager & Chief Planning Officer
Page 245 of 314

Page 246

10 
N Lennon, Service Manager - Capital Projects & New Build
H Hatfield, Project Officer
B Mitchell, Paralegal
A Smith, Paralegal
W O’Connor, Paralegal
S Coyle, Team Leader - Finance & Governance 
9.  Action Implementation & Follow up 
9.1  Responsibility for the maintenance of adequate and effective controls rests with
management. Where the audit has identified areas for management action,
these are identified in the Management Action Plan. Where a decision is taken
by management not to act in response to finding from this review, it is the
responsibility of management to assess and accept the risk arising from non-
implementation. 
9.2  Achievement of the agreed actions is monitored through Internal Audit’s ‘follow
up’ arrangements. 
Page 246 of 314

Page 247

11 
10.  Management Action Plan
Action
Point
Para.
No Finding
Risk
Ratin
g
Agreed Action & Evidence Suggested
Action Owner
Target
Completion
Date
1 6.2.1 During document review, it was noticed
that the buyback quantities for September
2024 of the legal team were much higher
than listed on the SAHB plan (40 against
the actual 90). The total estimated
expenditure figure on buybacks was not
reflected as the number of properties
increased. Although not all buyback
properties are funded through the SHIP,
all the purchased quantities can be
reflected in the planning sheet to increase
the total number of affordable housing
units against the target for PKC. At each
SAHB meeting the total buyback quantity
increased from 40, to 64, then to 90,
however this change was not reflected in
the total projected spend column in the
SAHB spreadsheet.
3 Agreed action: 
•  Add a column on the SAHB
Monitoring Sheet reflecting the
current spend amount on
Buyback Properties, based on
the increased number of
properties. 
Agreed evidence:
• Updated SAHB Monitoring
sheet
N. Sworowski,
Place
Strategies
Manager &
Chief
Planning
Officer
June 2026
2 6.2.2 In our observation of the SAHB meetings
minutes are recorded, however the
discussions blend in with the action points.
There is no further clear outcome and
separate follow up Action Plan.
3 Agreed action: 
• Create an Action Plan table as
part of the meeting minutes
outcomes. 
Agreed evidence:
• Action Plan Appendix
E. Ritchie
Strategic
Lead -
Housing &
Communities 
Completed
Page 247 of 314

Page 248

12 
3 6.2.3 We acknowledge that although there is
strong control of affordable housing
delivery through SAHB, a clear flow
outlining each delivery group and its
responsibilities within and exactly which
areas are being covered in the delivery
plan, is not evident. The responsibilities
between Property, Economy,
Development & Planning and Housing &
Communities are very closely related.
2 Agreed action: 
• To create Process Flow Map
covering each department
within Affordable Housing
Delivery. 
• Communicate the outlined
Responsibilities and keep
within shared folder 
Agreed evidence:
• Flow Map
N.Sworowski,
Place
Strategies
Manager &
Chief
Planning
Officer
N.Lennon,
Service
Manager -
Capital
Projects &
New Build
J Beveridge,
Strategic
Lead -
Property
Services
September
2026
4 6.3.1 It was observed lack of transparency of
upcoming plans between buybacks in
Property Team and paralegal team. Each
team had their own stand-alone records
with no shared access of other team’s
progress. Shared detailed information or
access to upcoming work can improve on
wider team’s planning schedule.
2 Agreed action: 
• Access to paralegal team of
spreadsheets with upcoming
property volumes 
Agreed evidence:
• Buybacks Master Spreadsheet
Access Granted 
N. Lennon,
Service
Manager -
Capital
Projects &
New Build
Completed
Page 248 of 314

Page 249

13 
5 6.3.2 It was noted that the meetings between
property buybacks team and paralegals
were not regular and not recorded.
Structured plan with feedback from both
departments working in collaboration, can
improve efficiency in delivery of the
Affordable Housing Plan and reduce
potential delays during conveyancing
process.
1 Agreed action: 
• Biannual, suitable for both
teams (buybacks officer and
paralegal team) reviewing
current position, process
improvement and feedback. 
• Record and Email outcomes
from each meeting.
Agreed evidence: 
• Email outcomes from each
meeting
N. Lennon,
Service
Manager -
Capital
Projects &
New Build 
G. Fogg,
Legal
Manager
Legal and
Governance 
September
2026
6 6.3.3 Currently, the property criteria of buybacks
are quite generic when submitting to
paralegals for an offer letter to be sent out.
We understand that detailed information
for each property can be added during the
assessment process from the initial
viewing. All the unique applicable
information can be reflected to its
acquisition form for use of the paralegal
team. All additional information can
expedite the conveyancing process by
reducing the need for feedback at a later
point.
1 Agreed action: 
• The covering email from the
buyback officer will include
a standard separate paragraph
with specific instructions on
what paperwork/permissions
are to be requested in the formal
offer to purchase & what works,
if any, that have been carried
out.
• Attach all related property
documents to the acquisition
form for paralegal use. 
Agreed evidence:
• Covering emails with
detailed information
N. Lennon,
Service
Manager -
Capital
Projects &
New Build 
September
2026
Page 249 of 314

Page 250

14 
7 6.3.4 The buyback policy for processing
properties will need to be optimized and
further developed. This should include
purpose, scope, responsibilities,
procedures, and compliance measures,
approved by, date of issue and last
revision.  Strong and clear instructions,
formalised within the PKC template, will
ensure quality assurance in the process.
1 Agreed action: 
• To revise the Policy 
• To create a Procedure for
Buyback properties 
Agreed evidence:
• Finalised Policy and
Procedure
N Lennon,
Service
Manager -
Capital
Projects &
New Build 
September
2026
8 6.3.5 Conveyancing process can be lengthy with
various bottleneck points occurring during
legal work. We acknowledge the
experience of the paralegal team, however
lessons learned practises during
conveyancing are not captured. A
database of past issues serves as a
valuable information resource for future
training and educating of the wider
paralegal team.
2 Agreed action: 
• Introducing Lessons Learnt
Register/ Database 
• Share lessons learnt database
with Buybacks team for
process improvement 
Agreed evidence:
• Guidance Notes 
G Fogg,
Legal
Manager,
Legal &
Governance
Services 
August
2026
9 6.3.6 The paralegal team involved in the
buyback process is experienced and
efficient, using well-established work
routine and process. However, the steps
of the conveyancing process are not
captured and reflected directly on a
process-based sheet or work instruction.
2 Agreed action: 
• Creating a work instruction of
conveyancing steps within
paralegal team. 
• Checklist. 
Agreed evidence:
•  Work Instructions/ Procedure
G. Fogg,
Legal
Manager,
Legal &
Governance
Services 
Completed
Page 250 of 314

Page 251

15 
11.  Authorisation 
11.1 The auditor for this assignment was T Philip.  The supervising auditor was D
Arachchilage.
This report is authorised for issue: ............. 
12.  Distribution 
12.1 This report has been distributed to:
T Glen, Chief Executive
C Mailer, Depute Chief Executive
E Ritchie, Strategic Lead – Housing & Communities
S Marone, Strategic Lead – Economy, Development & Planning
S Walker, Strategic Lead – Finance & Business Support
L Simpson, Strategic Lead - Legal & Governance 
J Beveridge, Strategic Lead – Property Services
N Lennon, Service Manager - Capital Projects & New Build 
N Sworowski, Place Strategies Manager & Chief Planning Officer
Geoff Fogg, Legal and Governance Manager, Legal & Governance Services
Steven Coyle, Team Leader – Finance & Governance
Committee Services
External Audit 
Page 251 of 314

Page 252

16 
13.  Assessment Definitions 
13.1 The following table contains the definitions of the control objective assessment. 
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and control
exist, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in
the area audited.
Reasonable Assurance There is a generally sound system of governance, risk
management and control in place. Some issues, non-compliance
or scope for improvement were identified which may put at risk
the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk
management and control to effectively manage risks to the
achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control are inadequate to
effectively manage risks to the achievement of objectives in the
area audited. 
13.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions. 
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations/ major concerns which require
immediate action. Management will need to add these to the
appropriate Service risk register.
Issue represents a control weakness which could cause, or is
causing, severe disruption of the process or severe adverse
effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of key
controls requiring urgent action. Management should consider
adding these to the appropriate Service/ divisional risk register.
Issue represents a control weakness which could have, or is
having, major adverse effect on the ability to achieve process
objectives
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should consider
these when updating any divisional / team risk registers.
Page 252 of 314

Page 253

17 
Issue represents a control weakness which could have, or is
having, significant adverse effect on the ability to achieve process
objectives
2 Low Minor observations regarding the adequacy of controls which
require action to improve the efficiency, effectiveness, or
economy of operations or which otherwise require to be brought
to the attention of Senior Management
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process objectives
1 Trivial / Minor Very minor observations which will be raised during the audit and
may not be included within the final report.
Issue represents a very minor control weakness with negligible
impact on the ability to achieve process objectives. The issue will
be raised during the audit and may not be included within the final
report. 
Page 253 of 314

Page 254

Page 254 of 314

Page 255

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: Internal Audit Annual Report & Internal Audit Opinion
2025/26 
Report Number: 26/197 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: strategic Lead – Legal and Governance
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to present the year-end report and audit opinion
of the Chief Internal Auditor for 2025/26, as set out in Section 11. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Internal Control Framework
5. Internal Audit Planning
6. Internal Audit Outcomes 2025/26
7.  Follow Up Arrangements
8. Audit & Risk Committee
9. Compliance with Internal Audit Standards
10. Counter-Fraud & Corruption Activity
11. Audit Opinion 2025/26
12. Impact Value Assessment 
2. Recommendation 
It is recommended that the Committee: 
2.1 notes the content of this report and specifically the conclusion of the Chief
Internal Auditor, at Section 11, which states that reasonable reliance can be
placed on the Council’s risk management and governance arrangements, and
systems of internal control for 2025/26. 
12
Page 255 of 314

Page 256

3. Background/Context 
3.1  The Global Internal Audit Standards in the UK Public Sector (GIAS (UKPS))
became effective from 1 April 2026 and are the professional standards for
Internal Audit in the UK Public Sector. GIAS (UKPS) requires that the Chief
Audit Executive must prepare an overall conclusion at least annually, which
encompasses governance, risk management and control. This report fulfils
that requirement. 
3.2 Internal Audit is an independent, objective assurance and consulting activity
designed to add value and improve an organisation’s operations.   In
accordance with the GIAS (UKPS), it helps the IJB accomplish its objectives
by bringing a systematic, disciplined approach to evaluating and improving the
effectiveness of risk management, control and governance processes. 
4. Internal Control Framework 
4.1 Perth & Kinross Council’s internal controls include the full range of policies,
procedures and practices intended to ensure the proper conduct of its
operations and the achievement of its objectives. They include processes and
procedures, organisational structures, job descriptions, authorisation limits,
management supervision, risk management processes, reports and decisions. 
4.2 It is the responsibility of management to devise, implement and maintain
appropriate controls over the activities for which they are responsible. The
role of Internal Audit is to provide an opinion to the Council as to the
effectiveness of the controls that have been put in place by management in
order to ensure that the organisation achieves its objectives. Internal Audit is
thus a key part of the process by which the Council ensures the management
of the risks that threaten the achievement of its objectives. 
4.3 Internal Audit’s work is planned in such a way as to take account of these
risks. Prioritising work towards the areas of highest assessed risk enables the
Council to identify and remedy the most material weaknesses in its framework
of internal controls. 
5. Internal Audit Planning 
5.1 In line with the GIAS (UKPS), Internal Audit undertakes a process of planning
resulting in an annual plan. This plan was presented partly in themes, with
many themes cutting across Services. This approach targeted the key risks
identified as part of the Council’s Risk Management processes. In this
respect, the Internal Audit Plan for 2025/26 was able to closely align with the
Council’s risk management arrangements. 
5.2 For 2025/26, the report containing Internal Audit’s Strategy & Plan was
considered and approved in June 2025 (report 25/169). All Perth & Kinross
Council’s activities are reviewed as part of the planning process. 
Page 256 of 314

Page 257

The plan for 25/26 aimed to cover the most significant areas of risk within the
anticipated resources available whilst ensuring that there was a balance of
coverage for all Service areas during the year. 
5.3 In order to comply with GIAS (UKPS), there was a need identified for further
assessment by Internal Audit of the assurances provided by internal and
external sources, and the degree that reliance can be placed on these
activities. This formed part of the Internal Audit Plan for 2025/26. 
6. Internal Audit Outcome 2025/26 
6.1 Of the 12 planned Internal Audit assignments for 2025/26, one was removed
from the Internal Audit Plan to ensure audit effort was not duplicated with our
External Audit colleagues, two are being carried forward into 2026/27, with the
remaining assignments being complete or substantially complete and the
outcomes have been taken into consideration in arriving at the conclusion. 
6.2  Of those reports provided to Audit & Risk Committee within the year 2025/26,
Internal Audit was able to provide substantial assurance for one area over the
risk management, governance and internal controls in their areas, reasonable
assurance for 3 areas and limited assurance for 4 areas. 
6.3 Of the 113 individual actions included within reports considered by the Audit &
Risk Committee in 2025/26, 30 were rated of critical importance to the
business area, 25 were rated as of high-importance, 41 as medium-
importance, 10 as low-importance, with a further 7 identified as minor actions
for completion. Of the 30 critical actions, 24 were completed by the service
prior to the report being finalised. 
7. Follow Up Arrangements 
7.1 The responsibility for considering (and accepting or rejecting) Internal Audit’s
findings rests with management. Final audit reports record the agreed plan of
action, including the individual(s) responsible; the planned timescales for
completion; and the evidence required by Internal Audit to verify completion of
the action. The audit process is of little value unless action is taken to remedy
deficiencies in internal control where these are identified. Hence, a significant
part of Internal Audit’s role is the following-up of progress with these action
plans in line with the requirements of the Public Sector Internal Audit
Standards. 
7.2  A database for recording agreed actions is maintained for this purpose.
Services are routinely requested to provide the agreed evidence of completion
for actions which are due to have been completed. Where actions have not
been completed, an update on progress is requested along with the reason
for non-completion and a revised date for completion. The Audit & Risk
Committee is informed of all actions which have not been completed, along
with an Internal Audit opinion on the acceptability or otherwise of the response
received from management. 
Page 257 of 314

Page 258

7.3 The support of the Chief Executive, Depute Chief Executive and the Strategic
Leadership Team in ensuring that agreed actions are completed continued
during the year. 
7.4 In the Chief Internal Auditor’s opinion, the procedures in place provide a
sound basis for ensuring that progress against the agreed plans is exposed to
the proper level of scrutiny. 
8. The Audit & Risk Committee 
8.1 The Audit & Risk Committee operates within an approved ‘Role and Remit’
and as a formally constituted Committee of the Council. The Committee has
conducted its meetings as hybrid, with all meetings routinely recorded and
available to view via a link from the Committee’s webpage, thus ensuring a
high degree of accountability for its activities. 
9. Compliance with Internal Audit Standards 
9.1 The GIAS (UKPS) have been adopted by Perth & Kinross Council as the
relevant professional standards for 2025/26. 
9.2  The GIAS (UKPS) came into effect in April 2025. Preparations, in terms of
reporting their requirements to the Audit & Risk Committee and the Strategic
Leadership of the Council, were undertaken before and during the year, with
development sessions being help within the Internal Audit team. 
9.3 There is a requirement under these Standards for an external review of
compliance (External Quality Assessment – EQA) to be undertaken every 5
years. The EQA for Parth & Kinross Council was undertaken as a validated
self assessment in 2024/25 (report 25/60), therefore the next EQA will be
required in 2029/30. This report verified that Perth & Kinross Council’s Internal
Audit function fully conformed with the Public Sector Internal Audit Standards
(PSIAS), which were the relevant standards at that time. 
9.4 The GIAS (UKPS) requires that internal auditors must be independent,
namely free from conditions that threaten the ability to carry out their
responsibilities in an unbiased manner. The Chief Internal Auditor has
additional duties within Legal & Governance, specifically functional
responsibility for Information Governance, which may be perceived to
compromise this organisational independence. In order to manage these
risks, any internal audit activity in these areas are undertaken by, and
reported in the name of, the Senior Internal Auditor. 
9.5 The Chief Internal Auditor has undertaken a self-assessment of compliance
with the GIAS (UKPS) for 2025/26 and has concluded that the function
generally conforms, with some areas identified for further development in
terms of evidencing conformance. A Quality Assurance & Improvement
programme is being developed arising from this and reflects the transition
between PSIAS and GIAS (UKPS). 
Page 258 of 314

Page 259

9.6 A quality assurance system was in place in Internal Audit throughout 2025/26
which ensured the quality of Internal Audit work was of a consistent and
professional standard. 
9.7 Internal Auditors must conform to the Code of Ethics included within the
Standards. This Code incorporates the principles and rules of conduct for
Internal Auditors’ integrity, objectivity, confidentiality and competency. 
10. Counter-Fraud & Corruption Activity 
10.1 The responsibility for preventing and detecting fraud and corruption rests with
management; it is the responsibility of management to take into account the
risks arising from fraud and corruption and to devise and maintain the
appropriate internal controls to provide a reasonable level of assurance that
the Council’s resources are being protected from loss and misappropriation. 
10.2  Nevertheless, Internal Audit has a number of responsibilities regarding the
Council’s anti-fraud and anti-corruption arrangements, including
whistleblowing. The year 2025/26 saw an steady level of audit activity in this
area as described below compared with previous years. 
10.3 The National Fraud Initiative (NFI) is a large-scale ‘data-matching’ exercise
that takes place every two years and takes place over two financial years.
Perth & Kinross Council has participated in the 2024/25 exercise. The NFI
involves the comparison of personal data held by public authorities in order to
identify anomalies that may indicate fraud or error. This output then forms the
basis for a process of investigation within each authority, to ensure that errors
are recognised and corrected and that, where cases of possible fraud are
identified, they are pursued appropriately. 
10.4 This investigative process, which is driven by Audit Scotland, is co-ordinated
by Internal Audit and includes overseeing Services’ arrangements for
uploading the data securely and the checking of a sample of identified
anomalies within the period of the exercise, on the basis of an assessment of
risk. Internal Audit facilitates the reporting of progress to our External
Auditors, Audit Scotland. 
10.5 In order to ensure that the Council meets the standards set out in its counter-
fraud and corruption arrangements, some aspects of the Council’s ‘whistle-
blowing’ arrangements are managed by Internal Audit. This includes the
maintenance of a dedicated e-mail address and telephone line for employees
with concerns at work, which is routed to Internal Audit. The Council also
supports the national charity Protect that upholds the rights of those who raise
concerns about wrongdoing at their place of work and which operates a free
legal advice ‘hotline’. Whistleblowing arrangements have been in place
throughout 2025/26 and are supported by a Whistle-blowing Policy, which is
included within the Counter- Fraud and Corruption Strategy. 
Page 259 of 314

Page 260

10.6 Where control risks are highlighted as a result of these disclosures, these will
be reported to the Audit & Risk Committee. Where no control issues are
identified, detailed reports are not provided. The outcomes from all
whistleblowing disclosures feed into the planning exercise for the future
Internal Audit Plans. 
10.7 The Chief Internal Auditor is the Council’s nominated Money Laundering
Reporting Officer. There has been no activity in this area during the year. 
11. Audit Opinion 2025/26 
11.1 The Chief Internal Auditor concludes that reasonable reliance can be placed
on the Council’s risk management and governance arrangements, and
systems of internal control for 2025/26, subject to management
implementation of the agreed actions detailed in Internal Audit reports. 
12. Impact and Value Assessment 
12.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
13. Appendices 
13.1 Not applicable. 
Page 260 of 314

Page 261

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: Internal Audit Mandate & Charter 
Report Number: 26/198 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance 
1. Purpose 
1.1 The purpose of this report is to present Internal Audit’s Mandate and Charter,
in accordance with the Global Internal Audit Standards in the UK Public
Sector (GIAS (UKPS)). 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Conclusion
5. Impact Value Assessment
6. Appendix – Internal Audit Mandate & Charter 
2. Recommendation 
It is recommended that the Committee: 
2.1 approves the Internal Audit Mandate & Charter which is aligned to the
requirements of the Global Internal Audit Standards (GIAS) and their
application in the UK Public Sector and the CIPFA Code of Practice for the
Governance of Internal Audit in Local Government and confirms it accurately
reflects their understanding and expectations of the IA function. 
3. Background/Context 
3.1  The Global Internal Audit Standards require that an organisation formally
established its internal audit function by setting out its mandate and agreeing
a Charter, in line with the GIAS, the application note for the UK Public Sector,
and CIPFA’s Code of Practice for the Governance of Internal Audit in Local
Government.
13
Page 261 of 314

Page 262

3.2 The attached has been reviewed and takes account of the requirement for the
application of Topical Requirements published by the Institute of Internal
Auditors (where applicable). This Charter enables Internal Audit and the
organisation to demonstrate conformance with the GIAS (UKPS). 
4 Conclusion 
4.1 The approval of the Internal Audit Mandate & Charter enables compliance
with the GIAS (UKPS). 
5. Impact and Value Assessment 
5.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
6. Appendices 
6.1 Appendix 1 – Internal Audit Mandate & Charter 
Page 262 of 314

Page 263

1 
Appendix 1 
Internal Audit Mandate 
& Charter 
2026-27 
13
Page 263 of 314

Page 264

2 
Contents:
1. Executive Summary…………………………………………………………3
2. Purpose of Internal Audit…………………………………………………..3
3. Internal Audit Mandate……………………………………………………...4
4. Definitions……………………………………………………………………..5
5. Independence, Organisational Position and Reporting
Relationships…………………………………………………………………….5
6. IA Authority and Audit & Risk Committee Oversight………………….6
7. CAE Roles and Responsibilities…………………………………………..7
8. Management Responsibilities……………………………………………10
9. Scope and Types of Internal Audit Services ………………………….10
10. Topical Requirements……………………………………………………11
11. Annual Reporting and Overall Conclusion………………………..…11   
Page 264 of 314

Page 265

3 
Internal Audit Mandate & Charter for Perth & Kinross Council
1. Executive Summary 
In line with section 7(1) of The Local Authority Accounts (Scotland) Regulations 2014, local
authorities must operate a professional and objective internal auditing service in accordance
with recognised standards and practices in relation to internal auditing. 
The Global Internal Audit Standards (GIAS) came into effect in January 2025 and guide the
worldwide professional practice of internal auditing and serve as a basis for evaluating and
elevating the quality of the Internal Audit function. The Application Note: GIAS in the UK Public
Sector effective from 1 April 2025, provides a framework for the practice of IA in the UK Public
Sector when taken together with the GIAS. The GIAS (UK Public Sector) (GIAS (UKPS) sets out
interpretations and requirements which need to be applied to the GIAS, to form a suitable basis
for IA practice in the UK Public Sector. In addition, CIPFA have released a new Code of
Practice for the Governance of IA in Local Government to support compliance with the
principles and standards in Domain III (Governing the IA Function) of the GIAS (UK Public
Sector). Compliance with the Code must be included in the IA annual internal quality
assessment with outcomes reported to committee from 2025/26 onwards and the external
quality assessment, due every five years. Standard 6.2 in Domain III of the GIAS (Governing the
IA Function) requires the Chief Audit Executive (CAE) to implement and maintain an Internal
Audit Charter with sets out the purpose of Internal Audit, the Internal Audit mandate,
organisational position, essential conditions, reporting relationships, scope of work, types of
services, and other specifications in accordance with the GIAS. The Internal Audit Charter for
Perth & Kinross Council sets out these requirements and is based on the Institute of Internal
Auditor’s 2024 Model Charter.
2. Purpose of Internal Audit
In line with the GIAS, the purpose of the Internal Audit (IA) function is to strengthen the
Council’s ability to create, protect, and sustain value by providing the Audit & Risk Committee
and management with independent, risk-based, and objective assurance, advice, insight, and
foresight. The IA function enhances the Council’s: 
• successful achievement of its objectives 
• governance, risk management, and control processes 
• decision-making and oversight 
• reputation and credibility with its stakeholders 
• ability to serve the public interest. 
The Council’s IA function is most effective when: 
• internal auditing is performed by competent professionals in conformance with the GIAS (UK
Public Sector), which are set in the public interest 
Page 265 of 314

Page 266

4 
• the IA function is independently positioned with direct accountability to the Audit & Risk
Committee 
• internal auditors are free from undue influence and committed to making objective
assessments. 
IA assurance is provided by delivering an annual programme of audit work that independently
and objectively assesses the design and effectiveness of the controls established to manage
the Council’s most significant risks. 
The IA scope covers all Council activities.
Commitment to Adhering to the Global Internal Audit Standards
The Council’s internal audit function will adhere to the mandatory elements of The Institute of
Internal Auditors' International Professional Practices Framework, which are the GIAS and
Topical Requirements as well as the Application Note: Global Internal Audit Standards in the UK
Public Sector. When expressing conformance with standards, the Council’s IA function will be
clear that they are conforming with Global Internal Audit Standards in the UK Public Sector.
The CAE will report annually to the Audit & Risk Committee and senior management regarding
the internal audit function’s conformance with the Standards, which will be assessed through a
quality assurance and improvement program.
In addition to their primary role, the CAE will also: 
• support the Strategic Leadership Team in discharging their duties
• advise on the internal control implications of system or process changes within the Council 
• assist management in their duties to prevent and detect fraud and corruption 
• aim to add value to the Council in all its undertakings.
3. Internal Audit Mandate
In line with the GIAS, the Council’s IA function receives its mandate from the Audit & Risk
Committee. The mandate sets out the authority, roles and responsibilities, and empowers the IA
function to provide the Audit & Risk Committee and senior management with independent, risk-
based, and objective assurance, advice, insight, and foresight. 
The IA function’s authority is created by its direct reporting relationship to the Audit & Risk
Committee. Such authority allows for unrestricted access to the Audit & Risk Committee. 
The Audit & Risk Committee authorises the IA function to: 
• have full and unrestricted access to all functions, data, records, information, physical property,
and personnel pertinent to carrying out IA audit responsibilities. Internal auditors are
accountable for confidentiality and safeguarding records and information 
• allocate resources, set frequencies, select subjects, determine scopes of work, apply
techniques, and issue communications to accomplish the function’s objectives 
Page 266 of 314

Page 267

5 
• obtain assistance from the necessary personnel of the Council to complete internal audit
services.
4. Definitions
The Council has adopted the following definitions set out in the GIAS 2024 Glossary:
Internal Audit An independent, objective assurance and advisory service designed
to add value and improve an organisation’s operations. It helps an
organisation establish its objectives by bringing a systematic,
disciplined approach to evaluate and improve the effectiveness of
risk management, control, and governance processes.
Assurance Services Services through which internal auditors perform objective
assessments to provide assurance. The nature and scope of
assurance services are determined by Internal Audit.
Advisory Services Services through which internal auditors provide advice to an
organisation’s stakeholders without providing assurance or taking on
management responsibilities. The nature and scope of advisory
services are subject to agreement with relevant stakeholders.
Independence Freedom from conditions that threaten the ability of the internal audit
activity to carry out internal audit responsibilities in an unbiased
manner. 
5. Independence, Organisational Position, and Reporting
Relationships 
The CAE will be positioned at a level in the organisation that enables internal audit services and
responsibilities to be performed without interference from management, thereby establishing the
independence of the internal audit function. (See “Mandate” section.) 
The CAE report functionally to the Audit & Risk Committee and administratively (for example,
day-to-day operations) to the Strategic Lead, Legal & Governance. This positioning provides the
organisational authority and status to bring matters directly to senior management and escalate
matters to the Audit & Risk Committee, when necessary, without interference and supports the
internal auditors’ ability to maintain objectivity. 
The CAE will confirm to the Audit & Risk Committee, at least annually, the organisational
independence of the internal audit function. If the governance structure does not support
organisational independence, the CAE will document the characteristics of the governance
structure limiting independence and any safeguards employed to achieve the principle of
independence. The CAE will disclose to the Audit & Risk Committee any interference internal
auditors encounter related to the scope, performance, or communication of internal audit work
and results. The disclosure will include communicating the implications of such interference on
the internal audit function’s effectiveness and ability to fulfill its mandate.
To ensure that IA independence and objectivity is maintained for assurance services, IA will
remain free from interference from anyone within the Council in relation to audit selection,
scope, procedures, frequency, timing, and report content.
Page 267 of 314

Page 268

6 
Where IA also has responsibility for non-audit activities, the GIAS require that appropriate
arrangements are established to avoid conflicts of interest. 
Additionally, IA will not be permitted to audit any activities for which they have previously been
responsible within a period of one year and will not engage in any other activity that may impair
judgment or independence. 
For advisory services, the IA role will be specifically restricted to providing guidance, views, and
opinions. To comply with independence requirements, IA will not be involved in any aspects of
operational decisions subsequently taken by management.
Changes to the Mandate and Charter 
Circumstances may justify a follow-up discussion between the CAE, the Audit & Risk
Committee, and senior management on the internal audit mandate or other aspects of the
internal audit charter. Such circumstances may include but are not limited to:
• A significant change in the Global Internal Audit Standards.
• A significant reorganisation within the organisation.
• Significant changes in the CAE, Audit & Risk Committee, and/or senior management.
• Significant changes to the organisation’s strategies, objectives, risk profile, or the environment
in which the organisation operates.
• New laws or regulations that may affect the nature and/or scope of internal audit services.
6. IA Authority and Audit & Risk Committee Oversight
To establish, maintain, and ensure that the Council’s internal audit function has sufficient
authority to fulfill its duties, the Audit & Risk Committee will:
• Discuss with the CAE and senior management the appropriate authority, role, responsibilities,
scope, and services (assurance and/or advisory) of the internal audit function.
• Ensure the CAE has unrestricted access to and communicates and interacts directly with the
Audit & Risk Committee, including in private meetings without senior management present. 
• Discuss with the CAE and senior management other topics that should be included in the
internal audit charter.
• Participate in discussions with the CAE and senior management about the “essential
conditions,” described in the GIAS, which establish the foundation that enables an effective
internal audit function.
• Approve the internal audit function’s charter, which includes the internal audit mandate and the
scope and types of internal audit services.
• Review the internal audit charter annually with the CAE to consider changes affecting the
organisation, such as the employment of a new CAE or changes in the type, severity, and
interdependencies of risks to the organisation; and approve the internal audit charter annually.
• Approve the risk-based internal audit plan.
Page 268 of 314

Page 269

7 
• Provide input to the internal audit function’s human resources.
• Provide input to senior management on the appointment and removal of the CAE, ensuring
adequate competencies and qualifications and conformance with the GIAS (UKPS).
• Review and provide input to senior management on the CAE’s performance.
• Receive communications from the CAE about the internal audit function including its
performance relative to its plan.
• Ensure a quality assurance and improvement program has been established and review the
results annually.
• Make appropriate inquiries of senior management and the CAE to determine whether scope or
resource limitations are inappropriate.
7. CAE Roles and Responsibilities
Ethics and Professionalism
The CAE will ensure that internal auditors:
• Conform with the Global Internal Audit Standards, including the principles of Ethics and
Professionalism: integrity, objectivity, competency, due professional care, and confidentiality.
• Understand, respect, meet, and contribute to the legitimate and ethical expectations of the
organisation and be able to recognise conduct that is contrary to those expectations.
• Encourage and promote an ethics-based culture in the organisation. 
•Report organisational behavior that is inconsistent with the organisation’s ethical expectations,
as described in applicable policies and procedures.
Objectivity 
The CAE will ensure that the internal audit function remains free from all conditions that threaten
the ability of internal auditors to carry out their responsibilities in an unbiased manner, including
matters of engagement selection, scope, procedures, frequency, timing, and communication. If
the CAE determines that objectivity may be impaired in fact or appearance, the details of the
impairment will be disclosed to appropriate parties. 
Internal auditors will maintain an unbiased mental attitude that allows them to perform
engagements objectively such that they believe in their work product, do not compromise
quality, and do not subordinate their judgment on audit matters to others, either in fact or
appearance.
Internal auditors will have no direct operational responsibility or authority over any of the
activities they review. Accordingly, internal auditors will not implement internal controls, develop
procedures, install systems, or engage in other activities that may impair their judgment,
including:
• Assessing specific operations for which they had responsibility within the previous year. 
• Performing operational duties for the Council or its affiliates.
Page 269 of 314

Page 270

8 
• Initiating or approving transactions external to the internal audit function.
• Directing the activities of any Council employee that is not employed by the internal audit
function, except to the extent that such employees have been appropriately assigned to internal
audit teams or to assist internal auditors.
Internal auditors will:
• Disclose impairments of independence or objectivity, in fact or appearance, to appropriate
parties and at least annually, such as the CAE, The Audit & Risk Committee, management, or
others.
• Exhibit professional objectivity in gathering, evaluating, and communicating information. 
• Make balanced assessments of all available and relevant facts and circumstances.
• Take necessary precautions to avoid conflicts of interest, bias, and undue influence.
Managing the Internal Audit Function
The CAE has the responsibility to:
• At least annually, develop a risk-based internal audit plan that considers the input of the Audit
& Risk Committee and senior management. Discuss the plan with the Audit & Risk Committee
and senior management and submit the plan to the Audit & Risk Committee for review and
approval. 
• Communicate the impact of resource limitations on the internal audit plan to the Audit & Risk
and senior management.
• Review and adjust the internal audit plan, as necessary, in response to changes in the
Council’s business, risks, operations, programs, systems, and controls.
• Communicate with the Audit & Risk Committee and senior management if there are significant
interim changes to the internal audit plan.
• Ensure internal audit engagements are performed, documented, and communicated in
accordance with the GIAS (UKPS). 
• Follow up on engagement findings and confirm the implementation of recommendations or
action plans and communicate the results of internal audit services to the Audit & Risk
Committee and senior management for each engagement as appropriate. 
• Ensure the internal audit function collectively possesses or obtains the knowledge, skills, and
other competencies and qualifications needed to meet the requirements of the GIAS (UKPS)
and fulfill the internal audit mandate.
• Identify and consider trends and emerging issues that could impact the Council and
communicate to the Audit & Risk Committee and senior management as appropriate.
• Consider emerging trends and successful practices in internal auditing.
• Establish and ensure adherence to methodologies designed to guide the internal audit
function.
Page 270 of 314

Page 271

9 
• Ensure adherence to the Council’s relevant policies and procedures unless such policies and
procedures conflict with the internal audit charter or the GIAS (UKPS). Any such conflicts will be
resolved or documented and communicated to the Audit & Risk Committee and senior
management.
• Coordinate activities and consider relying upon the work of other internal and external
providers of assurance and advisory services. If the CAE cannot achieve an appropriate level of
coordination, the issue must be communicated to senior management and if necessary
escalated to the Audit & Risk Committee.
Communication with the Audit & Risk Committee and Senior Management 
The CAE will report to the Audit & Risk Committee and senior management regarding:
• The internal audit function’s mandate.
• The internal audit plan and performance relative to its plan.
• Significant revisions to the internal audit plan and budget. 
• Potential impairments to independence, including relevant disclosures as applicable. 
• Results from the quality assurance and improvement program, which include the internal audit
function’s conformance with GIAS (UKPS) and action plans to address the internal audit
function’s deficiencies and opportunities for improvement.
• Significant risk exposures and control issues, including fraud risks, governance issues, and
other areas of focus for the Audit & Risk Committee that could interfere with the achievement of
Council’s strategic objectives.
• Outcomes from assurance and advisory services.
• Resource requirements.
• Management’s responses to risk that the internal audit function determines may be
unacceptable or acceptance of a risk that is beyond the Council’s risk appetite. 
Quality Assurance and Improvement Program
The CAE will develop, implement, and maintain a quality assurance and improvement program
that covers all aspects of the internal audit function. The program will include external and
internal assessments of the internal audit function’s conformance with the GIAS (UKPS), as well
as performance measurement to assess the internal audit function’s progress toward the
achievement of its objectives and promotion of continuous improvement. The program also will
assess, if applicable, compliance with laws and/or regulations relevant to internal auditing. Also,
if applicable, the assessment will include plans to address the internal audit function’s
deficiencies and opportunities for improvement. 
Annually, the CAE will communicate with the Audit & Risk Committee and senior management
about the internal audit function’s quality assurance and improvement program, including the
results of internal assessments (ongoing monitoring and periodic self-assessments) and
external assessments. External assessments will be conducted at least once every five years by
a qualified, independent assessor or assessment team from outside the Council.
Page 271 of 314

Page 272

10 
8. Management Responsibilities
Management will cooperate with IA on audits and provide access to records, systems and
personnel as required within a reasonable timeframe following the request. 
Assurance engagements will be subject to a written terms of reference (Audit Brief) and report.
Advisory engagements will be agreed in writing (for example via email or written terms of
reference) and a relevant output agreed (for example full report/summary findings, focused
feedback or an action plan). 
Draft reports will be shared with management for agreement as to the factual accuracy of draft
findings raised. Management are to consider appropriate actions to mitigate the risks arising
from the control weaknesses identified. It is management’s responsibility to agree to either: 
• accept and fully implement actions at address the weaknesses identified or 
• accept the risk associated with not implementing improvements with supporting rationale. 
When a draft audit report is delivered, management are required to provide agreed
management actions to all IA findings raised, including specifying responsibility and anticipated
dates for the implementation of these actions. 
Management is also responsible for ensuring that agreed management actions are implemented
and effectively sustained. 
The GIAS also require the CAE to report to both senior management and the Audit & Risk 
Committee, details of management’s response to risk that (based on the CAE’s judgement) may
be unacceptable to the Council. Consequently, any IA findings where management has
accepted the risk will be highlighted in IA reports.
9. Scope and Types of Internal Audit Services 
The scope of internal audit services covers the entire breadth of the organisation, including all of
the Council’s activities, assets, and personnel. The scope of internal audit activities also
encompasses but is not limited to objective examinations of evidence to provide independent
assurance and advisory services to the Audit & Risk Committee and management on the
adequacy and effectiveness of governance, risk management, and control processes for the
Council. 
The nature and scope of advisory services may be agreed with the party requesting the service,
provided the internal audit function does not assume management responsibility. Opportunities
for improving the efficiency of governance, risk management, and control processes may be
identified during advisory engagements. These opportunities will be communicated to the
appropriate level of management.
Internal audit engagements may include evaluating whether: 
Risks relating to the achievement of the Council’s strategic objectives are appropriately
identified and managed.
Page 272 of 314

Page 273

11 
• The actions of the Council’s officers, management, employees, and contractors or other
relevant parties comply with the Council’s policies, procedures, and applicable laws, regulations,
and governance standards.
• The results of operations and programs are consistent with established goals and objectives.
• Operations and programs are being carried out effectively, efficiently, ethically, and equitably.
• Established processes and systems enable compliance with the policies, procedures, laws,
and regulations that could significantly impact the Council.
• The integrity of information and the means used to identify, measure, analyse, classify, and
report such information is reliable.
• Resources and assets are acquired economically, used efficiently and sustainably, and
protected adequately.
10. Topical Requirements
Topical Requirements are a mandatory component of the International Professional Practices
Framework and GlAS. Topical Requirements enhance the consistency and quality of Internal
Audit services related to specific audit subjects. Each Topical Requirement supports internal
auditors performing engagements in a specific risk area. 
All Internal Audit functions must apply the relevant Topical Requirement in conformance with the
GlAS (UKPS) when providing assurance services on that topic. A checklist for assessing
applicability of the Topical Requirements will be used by the Internal Audit team. Internal Audit
Assignment Briefs will advise management where a Topical Requirement may apply, and
further information will be obtained via scoping and fieldwork meetings.
11. Annual Reporting and Overall Conclusion 
In line with the GIAS (UK Public Sector) the CAE must, at least annually: 
• conclude on the overall adequacy and effectiveness of the Council’s framework of governance,
risk management and control (annual conclusion) 
• include a statement on conformance with the GIAS (UKPS) and the results of the Quality
Assurance Improvement Plan. 
The annual conclusion for the Council is based on the outcomes of the audits included in the IA
work programme, progress with implementation of agreed management actions, the result of
any other IA activities that have identified control gaps that are exposing the Council to risk, and
the professional judgement of the CAE. 
The Council has adopted the standard CIPFA standard engagement definitions for all
engagement conclusions and the overall annual audit conclusion..
Page 273 of 314

Page 274

Page 274 of 314

Page 275

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: Internal Audit Strategy & Plan 2026/27 
Report Number: 26/199 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to present the Strategy for the delivery of Internal
Audit services for Perth and Kinross Council, and the proposed approach for
the direction of planned Internal Audit work for 2026/27 
1.2 Sections 
1. Purpose
2. Recommendation(s)
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendation(s) 
It is recommended that the Committee: 
2.1 approves the strategy and plan for 2026/27. 
3. Background/Context 
3.1  The Global Internal Audit Standards in the UK Public Sector (GIAS (UKPS))
requires that the Chief Audit Executive should create an internal audit plan at
least annually, which considers all areas of the organisation’s business and its
governance, risk management and control processes. 
The Plan should be regularly reviewed and dynamic in terms of being
responsive to organisational need.
14
Page 275 of 314

Page 276

3.2 The Council’s strategic delivery of internal audit services is through a directly
employed team, with the option to bring in specialties as required to ensure an
adequate service delivery. 
3.3 Internal Audit’s strategy is to deliver a risk-based Internal Audit service by
designing planned activity around the Council’s key risks to achieving its
objectives. Internal Audit also aims to add value to the organisation by
ensuring that there is appropriate and enabling risk management, governance
and controls in place. 
3.4 In order to comply with GIAS (UKPS), there is a need for the further
assessment by Internal Audit of the assurances provided by internal and
external sources, and the degree that reliance can be placed on these
activities. This forms part of the Internal Audit Plan for 2026/27. 
3.5 In addition, evidence provided to support the Annual Governance Statement
has been examined. Information in relation to external inspections by
regulators and other bodies has also been taken into account, where
available, along with the outcomes from previous Internal Audit reviews. 
3.6 As in previous years, the Internal Audit Plan proposes a thematic approach to
elements of Council activity and risks assessed. The detailed scope of each
assignment will be agreed prior to the commencement of each thematic
review. 
3.7 Cumulative audit knowledge and experience has been drawn upon, from our
knowledge of the organisation, awareness of significant changes in systems
processes and personnel, previous Internal Audit involvement in areas of
activity and from our analysis of the risks faced by individual functions in
delivering their objectives. This has resulted in the identification of some
specific areas for Internal Audit activity in 2026/27. 
3.8 Reports arising from Internal Audit activity will be presented to the Audit &
Risk Committee except where the assignments are consultative in nature. A
summary of the work undertaken will be provided as part of the routine
Update reports, as agreed in in June 2016 (Report 16/306 refers). The
outcomes from these assignments will be taken into consideration in arriving
at future Internal Audit Plans. 
4. Main Issues 
Internal Audit resources 
4.1 Resources for Internal Audit activity in year is 3.6 full time equivalent posts
available plus the Chief Internal Auditor. These resources will be available to
undertake the Perth & Kinross Council and Integration Joint Board Internal
Audit Plans; ad-hoc advice and consultancy; investigations into fraud and
corruption; facilitate the National Fraud Initiative and overseeing the
whistleblowing arrangements.  
Page 276 of 314

Page 277

4.2 An allocation of resources is made annually for tasks relating to counter-fraud
and corruption activity, including the oversight and facilitation of the National
Fraud Initiative. 
4.3 An important part of the Internal Audit process is the verifying of the
implementation of agreed actions arising from Internal Audit reports. An
allocation of resources is made to support this process and to ensure that
Elected Members are informed of the status of actions arising from previous
audit reports. 
4.4 The Internal Audit service for the Integration Joint Board is provided jointly by
officers from Perth & Kinross Council and NHS, with the role of Chief Internal
Auditor being held by Perth & Kinross Council. Resources are set aside for
the provision of this Service. 
4.5 2026/27 represents the second year of the GIAS (UKPS) being in place, and
some additional resources will be directed to ensuring that the Internal Audit
Service is able to demonstrate further conformance with these Standards.
Furthermore, resources are released to ensure that appropriate professional
development is undertaken within the team. 
4.6 The leaves approximately 60% of audit time to be dedicated to planned
internal audit activity. 
5 Proposals 
5.1 The Strategic Risk Register is being presented for consideration at this
meeting of the Audit & Risk Committee. Internal Audit has an overview of the
arrangements for its development and have placed reliance on its content.
The key themes identified for inclusion within the Internal Audit Plan for
2026/27 are taken from the Strategic Risk Register, in consultation with the
Strategic Leadership Team. 
5.2 In addition, the requirements of GIAS (UKPS) have influenced some areas of
focus around internal assurances for 2026/27, which require to be validated to
enable formal assurance to be placed on their effectiveness. 
5.3 Additional work arising from past advisory work and whistleblowing
disclosures have also informed the focus for some assignments within the
proposed plan. 
5.4 Two assignments from the 2025/26 Plan appear on the table below, these
being Strategic Partnering within Environment & Infrastructure and Risk
Maturity. The former is a consultancy assignment, where Internal Audit is
represented on a working group which continues into 2026/27. The latter is an
assignment which is still required but has not yet been undertaken in year. 
Page 277 of 314

Page 278

5.5 A blended model of assurance and advisory/consultancy activity is proposed
within the table below. The table also highlights where audits are directly
linked to the risk register, enable assurance to be placed on internal
processes going forward, or arising out of other work, such as previous
advisory or whistleblowing disclosures. 
5.6 In line with the requirements of GIAS (UKPS), the Internal Audit Plan should
be dynamic. Therefore the Committee should note that there may be in-year
changes to adapt to circumstances not yet appreciated. 
Audit Theme Strategic
risk / audit
type
Strategic
Lead
Portfolio
Brief description
Strategic
Partnering
(continuing)
05
Advisory
Environment
&
Infrastructure
Carried forward.
To provide advice /
support for service
redesign and
transformation
Risk Maturity
(from 2025/26)
Internal
assurance
Strategic
Planning,
People &
Performance
Carried forward.
To review the Council’s
risk maturity in line with
best practice.
Forward
Planning
Advisory Strategic
Planning,
People &
Performance
To support the review of
corporate priorities
Assurance
Mapping
Internal
Assurance
Whole
Council
To work with Strategic
Leads to complete an
assurance mapping
exercise
Throughcare &
Aftercare
01
Assurance
Children,
Families &
Justice
To ensure that the
Council meets current
requirements for care
experienced young
people.
Organisational
Behaviour
All risks
Assurance
Whole
Council
To apply the IIA’s Topical
Requirement for the
review of the design and
implementation of
governance, risk
management and control
processes related to
organisational behaviour.
Complex Needs
Project
01
Assurance
Children,
Families &
Justice
To ensure the
effectiveness of the
project in delivering
outcomes
Treasury
Management
08
Assurance
Finance &
Business
Support
To ensure controls are in
place for treasury
management.
Page 278 of 314

Page 279

Customer
Insights
Assurance Customer &
Digital/
Finance &
Business
Support
To review the
arrangements in place for
identifying improvements
from customer
interactions.
IT Incident
Management
06, 07
Assurance
Customer &
Digital
To ensure that
arrangements in place for
managing IT incidents
are effective.
School Estate
Management
10
Assurance
Property
Services
To review arrangements
for ensuring the school
estate remains fit for
purpose.
Tay Cities Deal 03
Assurance
Economy,
Development
& Planning
To review local
governance, risk and
delivery arrangements 
Planning
Applications
Assurance Economy,
Development
& Planning
To ensure that the
arrangements in place for
processing planning
applications and the
decision making process
is robust and effective.
Public
Accessibility
Regulations
Assurance Strategic
Planning,
People &
Performance
To review the
arrangements in place to
ensure that the Council
conforms to the Public
Accessibility Regulations.
Transformation
Delivery &
Outcomes
05
Assurance
Programmes
& Projects
To ensure that
transformation continues
to deliver the desired
outcomes in terms of
benefits realisation and
governance, including
reporting. 
5.7 Furthermore, GIAS (UKPS) requires the Chief Internal Auditor to consider
assignments which would be included within the Internal Audit Plan if
additional resources were available and for these to be reported to the
relevant Committee. The following table includes such assignments, which
form part of the “reserve” list in the event that they can be accommodated
within year.   
Page 279 of 314

Page 280

Audit Theme Strategic
risk / audit
type
Strategic
Lead
Portfolio
Brief description
Family Group
Decision
Making
01
Assurance
Children,
Families &
Justice
To ensure the
effectiveness of
arrangements in place.
Unpaid Work 01; 04
Assurance
Children,
Families &
Justice
To ensure that National
Standards are being
achieved
Housing
Applications 
Assurance Housing &
Communities
To ensure that
applications for housing
are appropriately
managed.
Anti-poverty  04
Assurance
Strategic
Planning,
People &
Performance
To ensure maximum
benefit is being achieved
through the use of
allocated funding.
To ensure that
governance arrangements
support the anti-poverty
agenda. 
6 Conclusion 
6.1 In addition to fulfilling the GIAS (UKPS) requirement to provide a risk-based
Internal Audit Plan for 2026/27, this proposed Plan also assists in
demonstrating the degree to which reliance can be placed on internal sources
of assurance, which is also required by GIAS (UKPS). 
6.2 There will be an ongoing review of the emerging risks faced by the Council to
ensure that these themes cover the areas of highest risk in achieving the
Council’s objectives. 
6.3 The Plan is designed to be dynamic and proportionate. Any changes to the
Plan in-year, and the rationale, will be reported to the Audit & Risk Committee. 
7. Impact and Value Assessment 
7.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
8. Appendices 
8.1 Not applicable 
Page 280 of 314

Page 281

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: National Fraud Initiative 2024/25 Outcomes 
Report Number: 26/200 
Report Author: Jackie Clark, Chief Internal Auditor 
Organisational Lead: Strategic Lead – Legal and Governance
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to outline the action that has been taken by
Perth & Kinross Council in response to the requirements of the National Fraud
Initiative for 2024/25. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Progress Update
5. Outcome from Consultancy Work
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendation 
It is recommended that the Committee notes that: 
2.1 Perth & Kinross Council takes seriously its obligations for taking part in the
NFI exercise; 
2.2 The actions taken by Perth & Kinross Council in response to the requirements
of the NFI; and 
2.3 The 2024/25 exercise is now complete, with financial outcomes for Perth &
Kinross recorded as £131,236.42. 
15
Page 281 of 314

Page 282

3. Background/Context 
3.1  The National Fraud Initiative constitutes a sophisticated data matching
exercise matching electronic data within and between participating public
bodies to assist in the prevention and detection of fraud. The NFI exercise in
Scotland is Audit Scotland’s data matching exercise that runs every two years
in line with the published timetable. The Cabinet Office administers the NFI
and processes the data on behalf of Audit Scotland. This 2024/25 exercise
represents the nineth NFI data matching to be undertaken in Scotland. 
3.2 The overall aims of the NFI are to serve the public interest by safeguarding
public money against losses from fraud or misappropriation and to contribute
towards the fight against fraud. It improves the use made of public resources
by identifying anomalies in the data held by different authorities and by
ensuring that these are highlighted for further investigation. Whilst it is
designed to detect fraud, it may also identify instances of administration error
or inaccurate data. 
3.3 The NFI exercise helps participating bodies (such as Local Authorities, Police
Scotland, Scottish Fire and Rescue and the other public sector bodies) to
identify possible cases of fraud and detect and correct any consequential
under or overpayments. The NFI also helps Auditors in assessing the
Council’s arrangements for preventing, deterring and detecting fraud. 
3.4 There are broadly three stages in the NFI process:
1 the submission of the required datasets by public authorities and other
organisations;
2 the processing of the data (data matching) in order to identify
anomalies; and
3 the investigation of the highlighted and reported anomalies 
3.5 The Council is responsible for stages 1 and 3; processing of the data (stage
2) is carried out under arrangements put in place by the Cabinet Office. The
reported findings of the 2022/23 exercise was presented to Audit Committee
in June 2024 (report 24/199). 
3.6 Internal Audit acts as a facilitator within the Council and maintains regular
contact with Services and external audit to ensure that the former are
progressing investigations in accordance with the NFI timetable and guidance. 
3.7 The Audit Committee is aware that Perth & Kinross Council is one of two local
authorities which did not provide the Electoral Roll for the NFI. Legislation to
allow Audit Scotland to require Councils to provide information for NFI
purposes was introduced after the 2008/09 exercise, subject to any sharing
being compliant with data protection legislation.  However, the advice from
Legal Services was that this does not permit the Council to submit the
Electoral Register as there are specific legal restrictions in place which limit
the Council’s ability to share the Electoral Register.  Audit Scotland is aware
of the Council’s position. 
Page 282 of 314

Page 283

3.8 Consequently, Perth & Kinross Council does not use the NFI model for
checking eligibility to Council Tax’s single occupancy discount. This position is
being reviewed in advance of the forthcoming 2026/27 exercise. 
3.9 This report presents a summary of progress and the outcomes of the Perth
and Kinross Council NFI 2024/25 exercise. 
4. 2024/25 Outcomes for Perth & Kinross 
4.1 A total of 70 reports detailing different data matches were received in respect
of Perth and Kinross Council. As at 31 March 2026, these reports contained
5.665 matches, of which 126 matches were regarded as high risk. In addition
to investigating these matches, Services have reviewed the remaining
matches and investigated a proportion of these using a risk-based approach.
In total, 2,135 matches have been investigated, which represents 38% of all
matches. The exercise is now concluded. 
4.2 Of the 2,135 fully investigated matches, one error has been identified relating
to a match between the Council Tax Reduction Scheme and HMRS Property
Ownership records, with £3,441.22 currently being recovered. In terms of NFI
outcomes, a further estimated saving of £1,549.20 is attributed to the error,
therefore the NFI recorded outcome for this match is £4,990.42. In the
2022/23 exercise, there were no such errors or overpayments identified. 
4.3 A further 159 errors were identified, all of which related to matches associated
with blue badges. A notional value is placed on the value of blue badges and
has therefore been applied in terms of financial outcomes for Perth & Kinross,
which amounts to a further £126,246. 
4.4 Therefore, the total outcomes attributable to Perth & Kinross Council as a
result of the NFI exercise is £131,236.42. 
4.5 Information relating to the national outcomes will be made available later in
the year by Audit Scotland. 
6 Conclusion 
6.1 Perth & Kinross Council takes seriously its obligations for taking part in the
NFI and the 2024/25 exercise is now completed. 
7. Impact and Value Assessment 
7.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
8. Appendices 
8.1 None 
Page 283 of 314

Page 284

Page 284 of 314

Page 285

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Audit & Risk Committee 
Date of Meeting: 29 June 2026 
Report Title: Strategic Risk Annual Report 
Report Number:  26/201 
Report Author: L Dott, Team Leader 
Organisational Lead: L Simpson – Strategic Lead- Legal and Governance   
______________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to provide assurance that the Council’s Risk
Management Framework is adequate and effective and to advise the
Committee of the current key strategic risks facing the organisation and how
these risks are being mitigated and managed. 
1.2 Sections 
1. Purpose
2. Recommendation(s)
3. Background/Context
4. Strategic Risk Review Process
5. Risk Activity 2025/26
6. Next Steps 
7. Conclusion
8. Impact Value Assessment
9. Appendices 
2. Recommendation(s) 
It is recommended that the Committee: 
2.1 Considers the content of the report and provides appropriate and constructive
challenge and comment. 
2.2 Notes the current key strategic risks which have been identified through the
application of the approved risk management process.
16
Page 285 of 314

Page 286

2.3 Accepts the assurance as to adequacy and effectiveness of the risk
management framework 
3. Background/Context 
3.1  Sound risk management is central to good governance. It helps the Council
make informed decisions, respond to a changing operating environment and
maintain focus on delivering sustainable outcomes for the communities of
Perth and Kinross. In local government, risks are wide-ranging and often
interconnected, shaped by financial pressure, rising demand, legislative
change, partnership working and wider economic and social factors. That
makes it essential that risk is managed in a systematic, proportionate and
continuous way. 
3.2 The Council’s Risk Management Framework provides the structure through
which risks are identified, assessed, monitored and kept under review. The
framework was approved in 2017 and has continued to be reviewed and
refined to ensure that it remains relevant, practical and capable of supporting
effective decision-making in an increasingly complex environment. Risk
management is now embedded as part of the Council’s wider system of
internal control, with strategic and operational risks managed through an
ongoing cycle of evaluation, prioritisation and mitigation 
3.3 The framework is informed by recognised good practice, including ISO 31000,
Management of Risk (MoR) and guidance from the Association of Local
Authority Risk Managers (ALARM). Together, these provide the basis for a
consistent corporate approach to risk across the organisation. The framework
comprises:
• Risk Management Policy, setting out the Council’s commitment to
effective risk management. 
• Risk Management Strategy, describing the Council’s overall approach
and risk hierarchy. 
• Risk Appetite Statement, explaining the level of risk the Council is
prepared to tolerate in pursuit of its objectives. 
• Risk Management Process Guide, providing practical tools and guidance
to support a consistent approach across the organisation. 
3.4 Risk is assessed by considering both the likelihood of it materialising and its
potential impact, including financial and non-financial consequences. Risk
cannot be eliminated entirely, so the Council applies proportionate controls
and mitigation measures to manage exposure to an acceptable level. 
3.5 The Strategic Risk Register, attached at Appendix 1, sets out the key strategic
risks facing the Council at the time of reporting, together with the controls in
place to manage them. By its nature, risk is dynamic and subject to change as
circumstances evolve. For that reason, risks, scores, controls and mitigating
actions are kept under continuous review. While the Register provides a
snapshot at a particular point in time, it is operated as a live management
document and is routinely reviewed by the Senior Leadership Team.
Page 286 of 314

Page 287

4 Strategic Risk Review Process 
4.1 The Strategic Risk Review Process is designed to ensure that the Council’s
most significant risks are identified, assessed, prioritised and kept under
regular review in a consistent and structured way. It supports a clear
corporate understanding of strategic risk, the adequacy of existing controls
and where further mitigation may be required. Taken together, the strategic
risks provide an overview of the Council’s wider risk landscape and support
informed governance and decision-making. 
4.2 The Strategic Risk Register opens with a summary of the overall corporate
strategic risk position and then sets out each risk in more detail. For each
strategic risk, the register records the key causes and consequences, the
controls currently in place, an assessment of their effectiveness, and any
further actions considered necessary and proportionate to manage exposure.
References to risk appetite within the system should be disregarded at this
stage, as this remains an area for further development. 
4.3 Each strategic risk is expressed in terms of cause and effect. This helps
ensure there is a clear understanding of the factors that could lead to the risk
materialising and the range of consequences that could arise across the
Council. 
4.4 Risks are assessed by reference to likelihood and impact. The inherent risk
score reflects the level of risk before controls are applied, while the residual
risk score reflects the position after existing controls and mitigation are taken
into account. In some cases, risks cannot be materially reduced through
Council action alone, particularly where outcomes depend on external factors
or the actions of partner bodies. Risks are prioritised using the residual risk
score as follows:
• Priority 1: residual risk score 16–25
• Priority 2: residual risk score 10–15
• Priority 3: residual risk score 6–9
• Priority 4: residual risk score 1–5. 
4.6 Based on the current evaluation, the highest priority risks include the
protection of vulnerable children and adults, growing the local economy, and
addressing poverty and the inequalities gap 
4.7 A high residual score does not in itself indicate weak mitigation. In many
cases, substantial control and mitigation activity is already in place and is
having a positive effect. Risks may remain in the highest priority category
because of their scale and complexity, because effective mitigation depends
in part on action by other organisations, or because wider external conditions
continue to drive uncertainty. 
Page 287 of 314

Page 288

4.8 Equally, a lower score does not mean that a risk is of lesser importance. It
may instead reflect the relative scope and effectiveness of controls that are
already in place and within the Council’s direct influence. Other significant
risks may sit within operational risk registers in accordance with the Risk
Management Strategy and are monitored and managed by the relevant
Strategic Leads and management teams, subject to the escalation and
accountability arrangements set out in the wider Risk Management
Framework 
5. Risk Activity 2025/26 
5.1 During 2025/26, the Council continued to strengthen its risk management
arrangements, with a particular focus on improving the quality, consistency
and visibility of risk information. Risk-trained officers worked closely with Risk
Owners and the Strategic Leadership Team to review the strategic risk profile,
support changes in risk ownership following service restructure, and provide
constructive challenge on risk scoring and assessment. This included focused
engagement and follow-up work to test the impact of new and emerging risks
within an increasingly complex operating environment. 
5.2 Progress also continued in embedding PK Performs as the Council’s core risk
management system. A Power BI dashboard for strategic risk has been
developed and is being tested with Strategic Leads ahead of wider
consultation and roll-out. This is intended to improve the visibility of strategic
risk information and strengthen reporting and oversight arrangements. 
5.3 During the year, work also began in terms of reviewing corporate risk appetite.
The initial exercise was look at strategic risks emerging from operational
portfolios and transformation and change activity. A workshop was held with
the Strategic Leadership Team in March 2026 and it was agreed that a
revised approach should be taken forward, aligned to the development of the
new Corporate Plan so that risk appetite and strategic direction are properly
connected. The next phase of development will consider political risk appetite
and will require engagement with elected members. 
5.4 Following the SLT workshop, work commenced with the PK Performs supplier
to develop the risk appetite indicator field. The intention is to improve how risk
appetite is reflected within the system and to support a clearer and more
meaningful relationship between appetite, impact and risk reporting. 
5.5 We are working collaboratively as part of the Tayside Risk Management
Group to learn and share information and best practice with colleagues and to
benchmark to drive improvement.  
6 Next Steps 
6.1 The next phase of work will focus on further embedding and maturing the
Council’s risk management arrangements. 
Page 288 of 314

Page 289

This will include responding to the planned internal audit of risk management
arrangements and implementing any recommendations arising from that work
to strengthen the control environment further. 
6.2 The Council will also continue to roll out and embed the Strategic Risk Power
BI dashboard as part of its wider approach to improving risk visibility,
oversight and reporting. 
6.3 Work will continue with the Transformation Programme and Council services
to ensure that risk management remains embedded both in project delivery
and in business-as-usual activity. At the same time, further improvements will
be made to PK Performs to ensure that the system continues to meet
organisational needs. 
6.4 A revised Risk Appetite Statement will be developed through engagement
with Elected Members and officers following development of the new
Corporate Plan. This will help ensure that the Council’s approach to risk is
aligned with its strategic priorities and decision-making framework. 
7. Conclusion 
7.1 The Council's Risk Management Framework remains robust and effective. It
provides and appropriate basis for identifying, assessing and managing key
strategic risks facing the organisation. It will continue to be reviewed
throughout 2026/27 to ensure that it remains fit for purpose and responsive to
the Council’s changing operating environment. 
7.2 A clear programme of work is in place to further strengthen the framework,
improve the quality of risk information and support the Council in achieving its
strategic objectives. On that basis, assurance can be given that risk is being
actively monitored and managed in accordance with the Council’s approved
Risk Management framework. 
8. Impact and Value Assessment 
8.1 This report does not qualify for Impact and Value Assessment. 
9. Appendices 
9.1 Appendix 1 - Strategic Risk Register 
Page 289 of 314

Page 290

Page 290 of 314

Page 291

Heatmap Report
PKC
Print Date: 15-Jun-2026
16
Page 291 of 314

Page 292

PKC Heatmap Report
HEATMAP
Probability
Very High
High
Medium
Low
Very Low
Insignificant Minor Moderate Major Critical
Impact
Priority 1 Priority 2 Priority 3 Priority 4 Inherent Residual
15-Jun-2026 Page 2 of 24Page 292 of 314

Page 293

PKC Heatmap Report
RISK SUMMARY
Strategic Risk
No. Risk Event Inherent Residual Trend
1 SR-01 - We fail to protect children and vulnerable adults from harm Priority 1 Priority 1
Comments: SMT workshop held to review the risk and other elements such as impact, controls and actions. Risk has now been updated. Updated actions and included
additional work around Public Protection Strategy and added new control appointment of CSWO. Scoring revised following review.
2 SR-02 - We fail to mitigate or reduce the impact of climate change in Perth and Kinross within the scope of our control and resources Priority 1 Priority 1
Comments: Circular Economy Strategy added as a control, andl causes and consequences added.
3 SR-03 - The economy in Perth & Kinross does not grow in an inclusive and sustainable way Priority 1 Priority 1
Comments: 1 control upgraded from improvement required to effective and 2 controls from adequate to effective following progress of actions taken to strengthen control
environment in 2025/26.
4 SR-04 - Our actions to tackle poverty and address the inequalities gap within Perth & Kinross are ineffective Priority 1 Priority 1
Comments: Anti-Poverty Strategy endorsed by Council and approved by Anti-Poverty Task Force. Action Plan has been developed from the strategy and thematic sub groups
established. Council Poverty Board has met regularly this year providing stronger internal Governance. New action added to reflect the development of the Fairer Futures
programme, funded by SG to develop an place based and evidence led approach to tackling child poverty.
Probability of overall risk remains the same despite positive downturn in Child Poverty figures as external factors around energy prices and cost of living are still a major
influence. Risk actions also reviewed
5 SR-05 - The Transformation and Change programme does not meet expected outcomes and deliver the future, sustainable public
services that our communities need within available resources Priority 1 Priority 2
Comments: Risk is now changing slightly to take into consideration the move from phase 2 to phase 3 and the possible consolidation of business improvement / programme
management office teams. There has been a very slight delay in implementation due to the need for some structural change in terms of SL portfolios.
6 SR-07 - Our operational response (in a non-public health related emergency situation) is inadequate or ineffective Priority 1 Priority 3
Comments: Full review of controls and overall residual scores carried out.
7 SR-08 - There are insufficient financial resources to provide the services that our communities need. Priority 1 Priority 1
Comments: Reviewed post budget approval. New control added around no purchase, no pay in line with updated financial regulations and safeguarding policy.
8 SR-09 - We have insufficient capacity and skills within the workforce to deliver the services that our communities need Priority 1 Priority 2
Comments: Reviewed. Delivery actions and performance updates are provided cyclically through the People and Culture Strategy and continue to be monitored closely by SLT
and the Workforce Planning Board.
9 SR-010 - Council buildings and other assets are not safe, fit for purpose or providing best value Priority 1 Priority 2
Comments: Reviewed - 30 Year Plan & Status Reports In Progress
Awaiting BV Audit Outcome
15-Jun-2026 Page 3 of 24Page 293 of 314

Page 294

PKC Heatmap Report
No. Risk Event Inherent Residual Trend
10 SR-011 - The health and safety of staff and the public is not adequately protected Priority 1 Priority 3
Comments: No changes to scoring, actions updated.
15-Jun-2026 Page 4 of 24Page 294 of 314

Page 295

PKC Heatmap Report
RISK OVERVIEW
Strategic Risk
SR-01 We fail to protect children and vulnerable adults from harm
Risk Categories:  People / Human Resource,
Audit, Legislation and Compliance
Risk Owner: Arun Singh Secondary Responsible Person(s):
Sharon Cooper
Last Reviewed Date: 08 May,
2026
Next Review Date: 31 Aug,
2026
Organisation > Perth and Kinross Health and Social Care Partnership > Integrated Health and Care - Adults
Organisation > Perth and Kinross Health and Social Care Partnership > Children, Families & Justice
Organisation > Chief Executive > Education & Learning
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Lack of continuous improvement activity to provide assurance (i.e. self evaluation,
lived experience)
• Failure to learn from learning reviews undertaken in other areas across the UK
• Ensuring staff have an active PVG membership in place
• Lack of training and development opportunities to identify and assess risk
• High/increased workload and/or limited staff capacity affecting quality of
recording
• Organisational and operational functional changes that impact staffing, systems
and time
• Evolving and complex legislative landscape
• Failure to align and prioritise budgets and resources
• Failure to develop a sense of collective responsibility (both within and out-with
the Council)
• Inadequate/ poor quality data and business intelligence (e.g. AI transcriptive
tools)
• Incohesive partnership working (eg ineffective communication and data sharing)
• Increasing vulnerabilities and complexities in terms of need across our
communities
Consequences
• Incomplete or inaccurate case records affecting decision-making
• Increased safeguarding risk due to missed or unidentified concerns
• Ineffective or delayed interventions resulting in unresolved or escalating risk
• Increased pressure on council services and other parts of the public sector
• Increasing failure demand and resources wasted on ineffective interventions
• Legal /financial claims and penalties for breach of duties and/or injury
• Poorer health and social wellbeing outcomes for communities
• Reputational damage/loss of public confidence
• Significant harm to individuals
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-74.1 PKC Child Protection Processes/Policies/Procedures Arun Singh Effective 04 May, 2027
CTL-01.1 Multi-agency public protection Chief Officers Group Arun Singh Effective 04 May, 2027
CTL-02.1 PKC Adult Support Protection Processes/Policies/Procedures Arun Singh Effective 04 May, 2027
CTL-03.1 Multi-agency Adult Protection Committee Arun Singh Effective 04 May, 2027
CTL-04.1 Multi-agency Child Protection Committee Arun Singh Effective 04 May, 2027
15-Jun-2026 Page 5 of 24Page 295 of 314

Page 296

PKC Heatmap Report
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-06.1 Robust internal governance and assurance systems Arun Singh Effective 04 May, 2027
CTL-435.1 Multi Agency Public Protection Arrangements (MAPPA) Arun Singh Effective 04 May, 2027
CTL-436.1 MARAC - Multi-Agency Risk Assessment Conference Arun Singh Effective 04 May, 2027
CTL-437.1 Social Work Governance and Assurance Group Arun Singh Effective 04 May, 2027
CTL-438.1 Learning and Development Offer to Workforce Arun Singh Effective 04 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Compile Adult Protection Annual Report 2024/25 and
Improvement Plan 2025/26 and present to the Adult
Protection Committee, Chief Officers Group, Council
and Integrated Joint Board
Arun Singh Completed 100 31 Dec, 2025
Compile Adult Protection Annual Report 2025/26 and
Improvement Plan 2026/27 and present to the Adult
Protection Committee, Chief Officers Group, Council
and Integrated Joint Board
Arun Singh Not Started 0 31 Dec, 2026
Compile the Child Protection Standards and Quality
Assurance Report 2024/25 and present to the Child
Protection Committee, Chief Officers Group and
Council
Arun Singh Completed 100 31 Dec, 2025
Compile the Child Protection Standards and Quality
Assurance Report 2025/26 and present to the Child
Protection Committee, Chief Officers Group and
Council
Arun Singh Not Started 0 31 Dec, 2026
Develop a Public Protection Strategy based on
priorities identified at Public Protection Evaluation
session across all public protection areas
Arun Singh Completed 100 31 Mar, 2026
Develop Children, Families & Justice Service Plan Arun Singh In Progress 50 30 Sep, 2026
15-Jun-2026 Page 6 of 24Page 296 of 314

Page 297

PKC Heatmap Report
SR-02 We fail to mitigate or reduce the impact of climate change in Perth and Kinross within the scope of our control and resources
Risk Categories:  Environment, Audit, Legislation
and Compliance
Risk Owner: Fraser Crofts Last Reviewed Date: 09 Apr,
2026
Next Review Date: 09 Jul,
2026
Organisation > Depute Chief Executive > Environment & Infrastructure
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
9.00 for this category
Causes
• A lack of leadership and accountability
• Energy inefficiency
• Failure to develop a sense of collective responsibility (both within and out-with
the Council)
• Failure to influence culture and behaviour
• Failure to respond appropriately to evolving statutory duties & responsibilities
• Inadequate planning/ failure to prioritise and align appropriate resource
• Inadequate resources and capacity
• Ineffective /inefficient asset management
• The current economic climate
Consequences
• Detrimental impact on environmental, health and wellbeing outcomes across our
community
• Failure to meet our climate reduction Futures and responsibilities, with potential
legislative penalties
• Failure to reduce carbon footprint
• Increased inequalities across communities
• Increase in occurence of adverse weather events
• Inflated investment requirements due to not taking early action
• Reputational damage/loss of public confidence
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-62.1 Climate Change Strategy and Action Plan Fraser Crofts Effective 31 May, 2027
CTL-07.1 Climate Change and Sustainability Committee and Convenor's meeting Fraser Crofts Effective 31 May, 2027
CTL-08.1 Climate Change & Sustainability Group Fraser Crofts Effective 31 May, 2027
CTL-250.1 Impact and Value Assessment Tool Divindy Grant Adequate 31 May, 2027
CTL-406.1 Circular Economy Strategy Fraser Crofts Adequate 31 May, 2027
CTL-78.2 Corporate Plan 2022-27 Greg Boland Adequate 31 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Carbon Literacy Training for Elected Members and
Senior Officers Divindy Grant In Progress 62 30 Sep, 2026
Develop Cumulative Climate Impact Assessment of
Budget to be taken to Climate Change and
Sustainability Committee
Divindy Grant In Progress 65 31 Dec, 2026
15-Jun-2026 Page 7 of 24Page 297 of 314

Page 298

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Engage and develop strategy development processes
to ensure climate change is considered and
embedded in these
Louisa Dott Completed 100 31 Mar, 2026
Review of membership and participation in Climate
Change Commission Pete Leonard Completed 100 30 Sep, 2025
15-Jun-2026 Page 8 of 24Page 298 of 314

Page 299

PKC Heatmap Report
SR-03 The economy in Perth & Kinross does not grow in an inclusive and sustainable way
Risk Categories:  Finance, People / Human
Resource
Risk Owner: Serge Merone Last Reviewed Date: 28 May,
2026
Next Review Date: 28 Nov,
2026
Organisation > Depute Chief Executive > Economy, Development & Planning
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
9.00 for this category
Causes
• A change in policy direction and potential funding impacts
• Failure to resource interventions to support economic development
• Failure to identify relevant factors impacting local economic resilience and
develop strategies to support local economy
• Failure to maximise on opportunities presented through the Tay Cities Deal and
other UK/SG funds
• The current economic climate, including the fallout from the Russia-Ukraine war,
global supply chain issues and the Cost of Living Crisis
Consequences
• Stagnation in wage growth
• A lack of positive destinations for school leavers
• Increased business failures
• Decline in housebuilding, business expansion and investment
• Increased failure demand and resources being wasted on ineffective interventions
• Increased poverty/inequalities across our communities
• Population and economic decline
• Rising unemployment
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-91.1 Perth & Kinross Economic Partnership Serge Merone Effective 30 Apr, 2027
CTL-14.1 Regional Economy Strategy Serge Merone Effective 30 Apr, 2027
CTL-16.1 UK Shared Prosperity Fund Serge Merone Adequate 30 Apr, 2027
CTL-17.1 Scottish Local Authorities’ Economic Development (SLAED) Group Serge Merone Effective 30 Apr, 2027
CTL-18.1 Local Employability Partnership Serge Merone Effective 30 Apr, 2027
CTL-19.1 Tay Cities Deal and Partnership Serge Merone Effective 30 Apr, 2027
CTL-86.1 Ongoing monitoring of local economy through relevant data Serge Merone Effective 30 Apr, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Accelerated delivery of step change projects Serge Merone Completed 100 31 Mar, 2026
Deliver key impact projects Serge Merone In Progress 10 30 Mar, 2030
Develop place-based targeted skills and
employability interventions Steven MacDonald In Progress 10 31 Mar, 2027
15-Jun-2026 Page 9 of 24Page 299 of 314

Page 300

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Review of external employability activities (following
internal transformation review) including Local
Employability Partnership
Serge Merone Completed 100 31 Mar, 2026
15-Jun-2026 Page 10 of 24Page 300 of 314

Page 301

PKC Heatmap Report
SR-04 Our actions to tackle poverty and address the inequalities gap within Perth & Kinross are ineffective
Risk Categories:  People / Human Resource,
Finance
Risk Owner: Greg Boland Secondary Responsible Person(s):
Alan Taylor,David MacLuskey,Serge
Merone
Last Reviewed Date: 05 May,
2026
Next Review Date: 28 Aug,
2026
Organisation > Depute Chief Executive > Economy, Development & Planning
Organisation > Depute Chief Executive > Environment & Infrastructure
Organisation > Chief Executive > Education & Learning
Organisation > Chief Executive > Strategic Planning, People & Performance
Organisation > Depute Chief Executive > Customer & Digital Services
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Adequate
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Failure to align and prioritise budgets with locality and local demographic needs
• Failure to plan and resource effective interventions to address needs
• Incohesive partnership working
• Low wage and in work poverty
• Rising costs (including food, fuel, housing)
• The current economic climate and cost of living crisis
Consequences
• An increasing demand for services, which the Council may be unable to meet
• A widening of the inequalities gap within Perth and Kinross
• Poor or reduced health, social and economic wellbeing outcomes within our
communities
• Pressure on statutory services
• Reduction in Council income
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-18.2 Local Employability Partnership Serge Merone Effective 31 May, 2027
CTL-92.1 Future for Families Project Steven MacDonald Effective 31 May, 2027
CTL-253.1 Transformation and Change Projects governed by SPP&P Greg Boland Adequate 01 May, 2027
CTL-21.1 Joint Welfare Reform Steering Group Alan Taylor Adequate 31 May, 2027
CTL-22.1 Governance and internal control arrangements Greg Boland Adequate 30 Apr, 2027
CTL-25.1 Local Child Poverty Action Plan Greg Boland Effective 30 Apr, 2027
CTL-24.1 Welfare Rights - income maximisation Alan Taylor Effective 01 May, 2027
CTL-20.1 Local Outcomes Improvement Plan Greg Boland Adequate 30 Apr, 2027
CTL-246.1 Poverty Theme Board Greg Boland Adequate 01 May, 2027
CTL-76.1 Anti-Poverty Task Force Greg Boland Improvement Required 30 Apr, 2027
CTL-77.1 Poverty Working Group Greg Boland Adequate 01 Apr, 2027
15-Jun-2026 Page 11 of 24Page 301 of 314

Page 302

PKC Heatmap Report
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Developing and testing a Wellbeing Budgeting
approach around the Poverty priority Paul Smith In Progress 70 30 Sep, 2026
Development of a cash-first approach Paul Smith Completed 100 31 Dec, 2025
Development of an Anti-Poverty Task Force Action
Plan Paul Smith In Progress 70 30 Sep, 2026
Development of Good Food Strategy in relation to
Food Insecurity Pete Leonard In Progress 10 01 Apr, 2028
Fairer Futures Programme Paul Smith In Progress 55 30 Mar, 2027
Further refine and expand upon PK insights proof of
concept Paul Smith Completed 100 26 Sep, 2025
15-Jun-2026 Page 12 of 24Page 302 of 314

Page 303

PKC Heatmap Report
SR-05 The Transformation and Change programme does not meet expected outcomes and deliver the future, sustainable public services that our
communities need within available resources
Risk Categories:  Transformational, Audit,
Legislation and Compliance, Finance, People /
Human Resource
Risk Owner: Charlene Guild Last Reviewed Date: 14 May,
2026
Next Review Date: 31 Aug,
2026
Organisation > Chief Executive > Projects & Programmes
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
WITHIN APPETITE
The appetite benchmark score is
15.00 for this category
Causes
• Failure to develop and expand community connections and relationships
• Failure to effect the necessary cultural change within the organisation to
implement new ways of working
• Failure to engage effectively local communities to better identify need
• Failure to prioritise/align financial resources to need
• Inadequate local population data and business intelligence
• Incohesive partnership working (eg ineffective communication and data sharing)
• Insufficient resources and capacity
Consequences
• A widening of the inequalities gap within Perth and Kinross
• Inability to sustain current service delivery within future resource allocation
• Failure to comply with statutory duties
• Increased failure demand and resources being wasted on ineffective interventions
• Lack of confidence in Council / reputational loss
• Poor or reduced health, social and economic wellbeing outcomes within our
communities
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-251.1 Transformation & Change Communications and Engagement Plan Charlene Guild Adequate 03 May, 2027
CTL-252.1 Programme Management Office Project Monitoring Process Charlene Guild Effective 02 May, 2027
CTL-84.1 Transformation and Change governance structures Charlene Guild Adequate 03 May, 2027
CTL-29.1 Transformation and Change Strategy and Implementation Plan Charlene Guild Adequate 03 May, 2027
CTL-78.1 Corporate Plan 2022-27 Greg Boland Adequate 03 May, 2027
CTL-79.1 Equalities Mainstreaming Report Elaine Ritchie Effective 03 May, 2027
CTL-82.1 Financial Management and internal control Scott Walker Effective 14 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Development and roll out of locality based, multi-
disciplinary working groups Paul Smith In Progress 60 31 Mar, 2027
Further development activity with CPP Louisa Dott In Progress 75 30 Dec, 2026
Implementation of Phase 3 Transformation &
Improvement Team Charlene Guild In Progress 50 30 Sep, 2026
15-Jun-2026 Page 13 of 24Page 303 of 314

Page 304

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Introduction of a universal service design approach
across PKC in relation to Transformation & Change
activity
Charlene Guild In Progress 80 31 Mar, 2027
Mapping of interdependencies across the
Transformation & Change Programme Charlene Guild Completed 100 31 Dec, 2025
Review of T&C Strategy (2022 - 27) to align with
Corporate Plan key priorities Charlene Guild Completed 100 31 Oct, 2025
15-Jun-2026 Page 14 of 24Page 304 of 314

Page 305

PKC Heatmap Report
SR-07 Our operational response (in a non-public health related emergency situation) is inadequate or ineffective
Risk Categories:  Property and Assets, People /
Human Resource
Risk Owner: Greg Boland Secondary Responsible Person(s):
Elaine Ritchie
Last Reviewed Date: 12 Nov,
2025
Next Review Date: 31 Aug,
2026
Organisation > Chief Executive > Strategic Planning, People & Performance
Organisation > Depute Chief Executive > Housing & Communities
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• A lack of leadership and accountability
• Lack of preparedness to severe weather/emergencies
• • A lack of resources (people) to properly plan, co-ordinate implement an
appropriate response as per action plan
• Failure to test civil contingency/business continuity plans and processes
• Inadequate civil contingency/business continuity plans to cover relevant
emergency situations
• Inadequate local population data and business intelligence
• Incohesive partnership working
• Insufficient resources and capacity
Consequences
• Poor staff well-being (stress, burnout etc) leading to Retention challenges &
reduced productivity
• Damage to property and infrastructure
• Damage to the environment
• Detrimental impact on local economy
• Harm to health and wellbeing
• Legal claims and/or financial costs and penalties
• Potential injury/fatality
• Reputational damage/loss of public confidence
• Unable to deliver essential services
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-33.1 Tayside Local Resilience Partnership Thomas Glen Effective 30 Apr, 2027
CTL-34.1 Effective network of community support/response Elaine Ritchie Effective 30 Apr, 2027
CTL-35.1 Cohesive partnership working in place to identify and support
vulnerable people Sue Terras Adequate 30 Apr, 2027
CTL-31.1 Business Continuity / Contingency plans Sue Terras Effective 30 Apr, 2027
CTL-32.1 Appropriately skilled staff at Strategic, Tactical and Operational levels Sue Terras Effective 23 Apr, 2027
CTL-94.1 Emergency response structure Thomas Glen Effective 30 Apr, 2027
CTL-247.1 North of Scotland Resilience Partnership Thomas Glen Effective 30 Apr, 2027
CTL-248.1 Annual Programme of Training for Elected Members, ELT and SLT and
others Sue Terras Effective 23 Apr, 2027
CTL-87.1 Concurrent Events document Sue Terras Effective 30 Apr, 2027
Residual Solutions
15-Jun-2026 Page 15 of 24Page 305 of 314

Page 306

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Implement recommendations arising from Internal
Audit Sue Terras In Progress 90 30 Jun, 2026
Maintain currency of plans for foreseeable incidents Greg Boland In Progress 80 31 Dec, 2026
Updating of Concurrent Events Document Greg Boland Completed 100 28 Feb, 2026
Work with IT and HSCP to design and implement
Persons at Risk Database (PARD) Greg Boland In Progress 70 31 Dec, 2026
15-Jun-2026 Page 16 of 24Page 306 of 314

Page 307

PKC Heatmap Report
SR-08 There are insufficient financial resources to provide the services that our communities need.
Risk Categories:  Finance, Audit, Legislation and
Compliance, Contract and Procurement,
Environment, Information Technology and
Security, People / Human Resource, Property and
Assets, Reputation and Public Image,
Transformational
Risk Owner: Scott Walker Last Reviewed Date: 18 May,
2026
Next Review Date: 01 Aug,
2026
Organisation > Chief Executive > Finance & Business Support
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
9.00 for this category
Causes
• Poor decision making
• Inappropriate use of resources
• Change in political direction
• Changing demographics
• Structural deficit in current revenue budget
• High level of construction inflation impacting capital budget
• Cyber defences being breached
• Failure to deliver planned savings due to a reduction in local government
funding/financial settlement
• Failure to prioritise/align financial resources to need
• Failure to transform Council services
• High levels of inflation
• Increased ring-fencing of funding
• Increasing and/or more complex needs
• Increase in expenditure
• Movements in financial settlement
• Movements in income
• Reduction in local government funding
• The current economic climate and cost of living crisis
Consequences
• Increased pressure on staff
• Failure to achieve best value
• Deterioration in quality and safety of assets
• Failure to deliver a balanced budget
• Increased costs through failure demand
• Increased pressures on other parts of public sector or 3rd sector
• Increase in future savings and significant reduction in the Council's reserves
• Lack of confidence in Council / reputational loss
• Legal /financial claims and penalties for breach of duties and/or injury
• Poor outcomes - economic, environmental and social wellbeing
• Reduction in availability/quality of services
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-63.1 Medium Term Financial Plan Scott Walker Adequate 31 May, 2027
CTL-64.1 Annual Accounts and Statutory Audit Processes Scott Walker Effective 31 May, 2027
CTL-95.1 Three Year Revenue Budget Scott Walker Effective 31 May, 2027
CTL-52.2 Strategic Investment Advisory Group Scott Walker Effective 31 May, 2027
CTL-36.1 Financial Strategy and Principles Scott Walker Effective 31 May, 2027
CTL-37.1 Transformation and Change Programme Charlene Guild Adequate 31 May, 2027
15-Jun-2026 Page 17 of 24Page 307 of 314

Page 308

PKC Heatmap Report
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-38.1 Capital Budget Scott Walker Effective 31 May, 2027
CTL-39.1 Treasury Management Scott Walker Adequate 31 May, 2027
CTL-40.1 Revenue and Capital monitoring Scott Walker Adequate 31 May, 2027
CTL-41.1 Continuous engagement with management and elected members, e.g.
Executive Leadership Group, Conveners, BRGs. Scott Walker Effective 31 May, 2027
CTL-443.1 No Purchase Order /No Payment Scott Walker Effective 18 May, 2027
CTL-204.1 Reserves Strategy Scott Walker Adequate 31 May, 2027
CTL-447.1 Proactive asset management - Corporate Strategy and plans Scott Walker Improvement Required 11 Dec, 2026
CTL-88.1 Financial Regulations and Supplementary Guidance Scott Walker Effective 31 May, 2027
CTL-211.1 Annual Governance & Assurance Statement Jacqueline Clark Effective 18 May, 2027
CTL-212.1 Investment Blueprint Scott Walker Effective 18 May, 2027
CTL-213.1 Budget Briefing Communications Scott Walker Effective 18 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Consolidation of finance function to transformation
the finance service Scott Walker In Progress 75 31 Mar, 2027
Develop generational ( 25+ year) strategic plan Greg Boland Not Started 0 31 Aug, 2027
Improved analysis of financial data (heatmap project) Scott Walker In Progress 70 31 Dec, 2026
No Purchase Order /No Payment Project Scott Walker Completed 100 31 Mar, 2026
Review and rationalisation of operational estate John Beveridge In Progress 5 30 Jun, 2036
Review and rationalisation of school estate David MacLuskey In Progress 1 30 Jun, 2036
Whistleblowing Communications plan Jacqueline Clark Completed 100 30 Jun, 2025
15-Jun-2026 Page 18 of 24Page 308 of 314

Page 309

PKC Heatmap Report
SR-09 We have insufficient capacity and skills within the workforce to deliver the services that our communities need
Risk Categories:  People / Human Resource,
Reputation and Public Image
Risk Owner: Greg Boland Secondary Responsible Person(s):
Pauline Johnstone
Last Reviewed Date: 28 May,
2026
Next Review Date: 31 Aug,
2026
Organisation > Chief Executive > Strategic Planning, People & Performance
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Difficulties with recruitment, shortages in the labour market
• Difficulties with retention, pay and grade, impact of hybrid working on existing
workforce
• Inadequate financial resources
• Inadequate workforce planning (including succession planning, policies &
strategies, vacancies management, wage analysis)
• Increase in sickness absence, reduced wellbeing
• Lack of knowledge and expertise in particular areas
• Workforce reduction through restructuring/consolidation as part of
transformation and change programme
Consequences
• Detrimental impact on environmental, economic and health and wellbeing
outcomes across Perth and Kinross
• Failure to deliver strategic objectives
• Failure to deliver the services that communities need / poor quality services
• Legal /financial claims and penalties for breach of duties and/or injury
• Poor staff morale, health and wellbeing/ increased staff absence
• Reputational damage/Council being seen as an unattractive employer
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-42.1 People and Culture Strategy 2024-2028 Pauline Johnstone Effective 31 May, 2027
CTL-43.1 Hybrid/new ways of working: guidance and operating models
established Pauline Johnstone Effective 31 May, 2027
CTL-44.1 Workforce planning procedures and guidance Pauline Johnstone Adequate 31 May, 2027
CTL-45.1 Modern Apprentice & Graduate trainee schemes Pauline Johnstone Effective 31 May, 2027
CTL-46.1 Leadership skills training Pauline Johnstone Adequate 31 May, 2027
CTL-47.1 Organisational development plan Pauline Johnstone Adequate 31 May, 2027
CTL-48.1 Wellbeing/resilience/support (including links to partner organisation
support resources for care workers) Pauline Johnstone Effective 31 May, 2027
CTL-49.1 Leadership Development Programme Pauline Johnstone Adequate 31 May, 2027
CTL-50.1 Employees Joint Consultative Committee Pauline Johnstone Effective 31 May, 2027
CTL-51.1 Joint Negotiating Committee for Teaching Staff Pauline Johnstone Effective 31 May, 2027
CTL-393.1 Leadership Development Strategy Pauline Johnstone Adequate 01 May, 2027
15-Jun-2026 Page 19 of 24Page 309 of 314

Page 310

PKC Heatmap Report
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-126.1 Employee Relations & Wellbeing Team Pauline Johnstone Adequate 31 May, 2027
CTL-127.1 Workforce Planning Themed Board Greg Boland Adequate 31 May, 2027
CTL-89.1 Health and Wellbeing Plan Pauline Johnstone Improvement Required 31 May, 2027
CTL-249.1 People Analytics Dashboard Pauline Johnstone Adequate 31 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Create a health and wellbeing pathway for change
across PKC and the P&K HSCP which identifies the
elements of a healthy workforce.
Pauline Johnstone In Progress 70 31 Dec, 2026
Deliver the People and Culture Strategy Action Plan
which is due for approval at Finance and Resources
Committee
Pauline Johnstone In Progress 90 30 Jun, 2026
15-Jun-2026 Page 20 of 24Page 310 of 314

Page 311

PKC Heatmap Report
SR-010 Council buildings and other assets are not safe, fit for purpose or providing best value
Risk Categories:  Property and Assets, People /
Human Resource
Risk Owner: Scott Walker Secondary Responsible Person(s):
Alan Taylor,Elaine Ritchie,Fraser
Crofts,John Beveridge
Last Reviewed Date: 14 May,
2026
Next Review Date: 29 Aug,
2027
Organisation > Depute Chief Executive > Environment & Infrastructure
Organisation > Chief Executive > Finance & Business Support
Organisation > Depute Chief Executive > Property Services
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Adequate
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Climate change and increase in extreme weather events
• Failure to respond appropriately to H&S concerns raised through national
enquiries/reports
• Failure to identify future investment where needed
• Inadequate maintenance and repair
• Ineffective asset management and planning
• insufficient resource and capacity
Consequences
• Detrimental impact upon ability to deliver or quality of services
• Increased costs due to insurance claims and maintenance
• Injuries/fatalities
• Legal /financial claims and penalties for breach of duties and/or injury
• Reputational damage/loss of public confidence
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-90.1 Condition and suitability surveys Scott Walker Effective 14 May, 2027
CTL-441.1 30 Year Rolling Investment Plan Scott Walker Adequate 14 May, 2027
CTL-442.1 Annual Status Report Gregor Walker Effective 14 May, 2027
CTL-55.1 Corporate Asset Management Framework Scott Walker Effective 14 May, 2027
CTL-52.1 Strategic Investment Advisory Group Scott Walker Effective 14 May, 2027
CTL-75.1 Asset Maintenance programmes Gregor Walker Adequate 14 May, 2027
CTL-54.1 Asset strategies, plans and performance information Scott Walker Effective 14 May, 2027
CTL-53.1 Asset Management Boards Scott Walker Adequate 14 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
30 year investment plan - Revision for 2025/26 Scott Walker Completed 100 31 Jan, 2026
Progress any actions from BV Audit (Awaiting
Outcomes) Gregor Walker Not Started 0 31 Mar, 2027
15-Jun-2026 Page 21 of 24Page 311 of 314

Page 312

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Revision of 30 Year Investment Plan & Asset Status
Reports Gregor Walker In Progress 10 31 Jan, 2027
Status reports for 2024/25 for key assets and report
to appropriate Boards and/or Committees Scott Walker Completed 100 30 Oct, 2025
15-Jun-2026 Page 22 of 24Page 312 of 314

Page 313

PKC Heatmap Report
SR-011 The health and safety of staff and the public is not adequately protected
Risk Categories:  Audit, Legislation and
Compliance, People / Human Resource
Risk Owner: Greg Boland Secondary Responsible Person(s):
Pauline Johnstone
Last Reviewed Date: 28 Apr,
2026
Next Review Date: 31 Jul,
2026
Organisation > Chief Executive > Strategic Planning, People & Performance
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Health & safety implications of new ways of working (e.g. hybrid / remote) not
fully known/understood
• Inadequate resources and capacity
• Ineffective monitoring, reporting and response
• Lack of understanding /failure to apply legislation
• Under-investment in training and controls
Consequences
• Detrimental impact on health and wellbeing
• Legal /financial claims and penalties for breach of duties and/or injury or death
• Poor working environment and work life balance
• Potential injury/fatality
• Reputational damage/loss of confidence
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-56.1 Health & Safety training and communication Lorna Hamilton Effective 01 May, 2027
CTL-57.1 Robust Corporate Occupational Health & Safety Policy with supporting
arrangement and guidance documents Lorna Hamilton Adequate 01 May, 2027
CTL-58.1 Corporate Health & Safety Team Lorna Hamilton Effective 01 May, 2027
CTL-59.1 Employees Joint Consultative Committee and Service based Health and
Safety Committees Pauline Johnstone Effective 01 May, 2027
CTL-60.1 Safe Systems of Work Lorna Hamilton Effective 01 May, 2027
CTL-61.1 Partnership working with Director of Public Health ongoing Pauline Johnstone Effective 01 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Develop an approach to replace Service Consultative
Committees with one Strategic Committee Pauline Johnstone Completed 100 30 Nov, 2025
Implementation of Occupational Health and Safety
policy and supporting topic specific arrangements Lorna Hamilton In Progress 90 31 Mar, 2027
Monitoring and auditing of health and safety
practices and procedures both by Management and
Corporate Health & Safety Team
Lorna Hamilton Deferred 25 31 Mar, 2027
15-Jun-2026 Page 23 of 24Page 313 of 314

Page 314

The entire contents of this document are subject to copyright with all rights reserved. 
All copyrightable text and graphics, the selection, arrangement and presentation of all information and
the overall design of the document are the sole and exclusive property of Riskonnect Inc.
Copyright © 2026 Riskonnect Inc. All rights reserved.
Page 314 of 314