Heatmap Report
PKC
Print Date: 15-Jun-2026

Page 2

PKC Heatmap Report
HEATMAP
Probability
Very High
High
Medium
Low
Very Low
Insignificant Minor Moderate Major Critical
Impact
Priority 1 Priority 2 Priority 3 Priority 4 Inherent Residual
15-Jun-2026 Page 2 of 24

Page 3

PKC Heatmap Report
RISK SUMMARY
Strategic Risk
No. Risk Event Inherent Residual Trend
1 SR-01 - We fail to protect children and vulnerable adults from harm Priority 1 Priority 1
Comments: SMT workshop held to review the risk and other elements such as impact, controls and actions. Risk has now been updated. Updated actions and included
additional work around Public Protection Strategy and added new control appointment of CSWO. Scoring revised following review.
2 SR-02 - We fail to mitigate or reduce the impact of climate change in Perth and Kinross within the scope of our control and resources Priority 1 Priority 1
Comments: Circular Economy Strategy added as a control, andl causes and consequences added.
3 SR-03 - The economy in Perth & Kinross does not grow in an inclusive and sustainable way Priority 1 Priority 1
Comments: 1 control upgraded from improvement required to effective and 2 controls from adequate to effective following progress of actions taken to strengthen control
environment in 2025/26.
4 SR-04 - Our actions to tackle poverty and address the inequalities gap within Perth & Kinross are ineffective Priority 1 Priority 1
Comments: Anti-Poverty Strategy endorsed by Council and approved by Anti-Poverty Task Force. Action Plan has been developed from the strategy and thematic sub groups
established. Council Poverty Board has met regularly this year providing stronger internal Governance. New action added to reflect the development of the Fairer Futures
programme, funded by SG to develop an place based and evidence led approach to tackling child poverty.
Probability of overall risk remains the same despite positive downturn in Child Poverty figures as external factors around energy prices and cost of living are still a major
influence. Risk actions also reviewed
5 SR-05 - The Transformation and Change programme does not meet expected outcomes and deliver the future, sustainable public
services that our communities need within available resources Priority 1 Priority 2
Comments: Risk is now changing slightly to take into consideration the move from phase 2 to phase 3 and the possible consolidation of business improvement / programme
management office teams. There has been a very slight delay in implementation due to the need for some structural change in terms of SL portfolios.
6 SR-07 - Our operational response (in a non-public health related emergency situation) is inadequate or ineffective Priority 1 Priority 3
Comments: Full review of controls and overall residual scores carried out.
7 SR-08 - There are insufficient financial resources to provide the services that our communities need. Priority 1 Priority 1
Comments: Reviewed post budget approval. New control added around no purchase, no pay in line with updated financial regulations and safeguarding policy.
8 SR-09 - We have insufficient capacity and skills within the workforce to deliver the services that our communities need Priority 1 Priority 2
Comments: Reviewed. Delivery actions and performance updates are provided cyclically through the People and Culture Strategy and continue to be monitored closely by SLT
and the Workforce Planning Board.
9 SR-010 - Council buildings and other assets are not safe, fit for purpose or providing best value Priority 1 Priority 2
Comments: Reviewed - 30 Year Plan & Status Reports In Progress
Awaiting BV Audit Outcome
15-Jun-2026 Page 3 of 24

Page 4

PKC Heatmap Report
No. Risk Event Inherent Residual Trend
10 SR-011 - The health and safety of staff and the public is not adequately protected Priority 1 Priority 3
Comments: No changes to scoring, actions updated.
15-Jun-2026 Page 4 of 24

Page 5

PKC Heatmap Report
RISK OVERVIEW
Strategic Risk
SR-01 We fail to protect children and vulnerable adults from harm
Risk Categories:  People / Human Resource,
Audit, Legislation and Compliance
Risk Owner: Arun Singh Secondary Responsible Person(s):
Sharon Cooper
Last Reviewed Date: 08 May,
2026
Next Review Date: 31 Aug,
2026
Organisation > Perth and Kinross Health and Social Care Partnership > Integrated Health and Care - Adults
Organisation > Perth and Kinross Health and Social Care Partnership > Children, Families & Justice
Organisation > Chief Executive > Education & Learning
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Lack of continuous improvement activity to provide assurance (i.e. self evaluation,
lived experience)
• Failure to learn from learning reviews undertaken in other areas across the UK
• Ensuring staff have an active PVG membership in place
• Lack of training and development opportunities to identify and assess risk
• High/increased workload and/or limited staff capacity affecting quality of
recording
• Organisational and operational functional changes that impact staffing, systems
and time
• Evolving and complex legislative landscape
• Failure to align and prioritise budgets and resources
• Failure to develop a sense of collective responsibility (both within and out-with
the Council)
• Inadequate/ poor quality data and business intelligence (e.g. AI transcriptive
tools)
• Incohesive partnership working (eg ineffective communication and data sharing)
• Increasing vulnerabilities and complexities in terms of need across our
communities
Consequences
• Incomplete or inaccurate case records affecting decision-making
• Increased safeguarding risk due to missed or unidentified concerns
• Ineffective or delayed interventions resulting in unresolved or escalating risk
• Increased pressure on council services and other parts of the public sector
• Increasing failure demand and resources wasted on ineffective interventions
• Legal /financial claims and penalties for breach of duties and/or injury
• Poorer health and social wellbeing outcomes for communities
• Reputational damage/loss of public confidence
• Significant harm to individuals
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-74.1 PKC Child Protection Processes/Policies/Procedures Arun Singh Effective 04 May, 2027
CTL-01.1 Multi-agency public protection Chief Officers Group Arun Singh Effective 04 May, 2027
CTL-02.1 PKC Adult Support Protection Processes/Policies/Procedures Arun Singh Effective 04 May, 2027
CTL-03.1 Multi-agency Adult Protection Committee Arun Singh Effective 04 May, 2027
CTL-04.1 Multi-agency Child Protection Committee Arun Singh Effective 04 May, 2027
15-Jun-2026 Page 5 of 24

Page 6

PKC Heatmap Report
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-06.1 Robust internal governance and assurance systems Arun Singh Effective 04 May, 2027
CTL-435.1 Multi Agency Public Protection Arrangements (MAPPA) Arun Singh Effective 04 May, 2027
CTL-436.1 MARAC - Multi-Agency Risk Assessment Conference Arun Singh Effective 04 May, 2027
CTL-437.1 Social Work Governance and Assurance Group Arun Singh Effective 04 May, 2027
CTL-438.1 Learning and Development Offer to Workforce Arun Singh Effective 04 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Compile Adult Protection Annual Report 2024/25 and
Improvement Plan 2025/26 and present to the Adult
Protection Committee, Chief Officers Group, Council
and Integrated Joint Board
Arun Singh Completed 100 31 Dec, 2025
Compile Adult Protection Annual Report 2025/26 and
Improvement Plan 2026/27 and present to the Adult
Protection Committee, Chief Officers Group, Council
and Integrated Joint Board
Arun Singh Not Started 0 31 Dec, 2026
Compile the Child Protection Standards and Quality
Assurance Report 2024/25 and present to the Child
Protection Committee, Chief Officers Group and
Council
Arun Singh Completed 100 31 Dec, 2025
Compile the Child Protection Standards and Quality
Assurance Report 2025/26 and present to the Child
Protection Committee, Chief Officers Group and
Council
Arun Singh Not Started 0 31 Dec, 2026
Develop a Public Protection Strategy based on
priorities identified at Public Protection Evaluation
session across all public protection areas
Arun Singh Completed 100 31 Mar, 2026
Develop Children, Families & Justice Service Plan Arun Singh In Progress 50 30 Sep, 2026
15-Jun-2026 Page 6 of 24

Page 7

PKC Heatmap Report
SR-02 We fail to mitigate or reduce the impact of climate change in Perth and Kinross within the scope of our control and resources
Risk Categories:  Environment, Audit, Legislation
and Compliance
Risk Owner: Fraser Crofts Last Reviewed Date: 09 Apr,
2026
Next Review Date: 09 Jul,
2026
Organisation > Depute Chief Executive > Environment & Infrastructure
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
9.00 for this category
Causes
• A lack of leadership and accountability
• Energy inefficiency
• Failure to develop a sense of collective responsibility (both within and out-with
the Council)
• Failure to influence culture and behaviour
• Failure to respond appropriately to evolving statutory duties & responsibilities
• Inadequate planning/ failure to prioritise and align appropriate resource
• Inadequate resources and capacity
• Ineffective /inefficient asset management
• The current economic climate
Consequences
• Detrimental impact on environmental, health and wellbeing outcomes across our
community
• Failure to meet our climate reduction Futures and responsibilities, with potential
legislative penalties
• Failure to reduce carbon footprint
• Increased inequalities across communities
• Increase in occurence of adverse weather events
• Inflated investment requirements due to not taking early action
• Reputational damage/loss of public confidence
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-62.1 Climate Change Strategy and Action Plan Fraser Crofts Effective 31 May, 2027
CTL-07.1 Climate Change and Sustainability Committee and Convenor's meeting Fraser Crofts Effective 31 May, 2027
CTL-08.1 Climate Change & Sustainability Group Fraser Crofts Effective 31 May, 2027
CTL-250.1 Impact and Value Assessment Tool Divindy Grant Adequate 31 May, 2027
CTL-406.1 Circular Economy Strategy Fraser Crofts Adequate 31 May, 2027
CTL-78.2 Corporate Plan 2022-27 Greg Boland Adequate 31 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Carbon Literacy Training for Elected Members and
Senior Officers Divindy Grant In Progress 62 30 Sep, 2026
Develop Cumulative Climate Impact Assessment of
Budget to be taken to Climate Change and
Sustainability Committee
Divindy Grant In Progress 65 31 Dec, 2026
15-Jun-2026 Page 7 of 24

Page 8

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Engage and develop strategy development processes
to ensure climate change is considered and
embedded in these
Louisa Dott Completed 100 31 Mar, 2026
Review of membership and participation in Climate
Change Commission Pete Leonard Completed 100 30 Sep, 2025
15-Jun-2026 Page 8 of 24

Page 9

PKC Heatmap Report
SR-03 The economy in Perth & Kinross does not grow in an inclusive and sustainable way
Risk Categories:  Finance, People / Human
Resource
Risk Owner: Serge Merone Last Reviewed Date: 28 May,
2026
Next Review Date: 28 Nov,
2026
Organisation > Depute Chief Executive > Economy, Development & Planning
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
9.00 for this category
Causes
• A change in policy direction and potential funding impacts
• Failure to resource interventions to support economic development
• Failure to identify relevant factors impacting local economic resilience and
develop strategies to support local economy
• Failure to maximise on opportunities presented through the Tay Cities Deal and
other UK/SG funds
• The current economic climate, including the fallout from the Russia-Ukraine war,
global supply chain issues and the Cost of Living Crisis
Consequences
• Stagnation in wage growth
• A lack of positive destinations for school leavers
• Increased business failures
• Decline in housebuilding, business expansion and investment
• Increased failure demand and resources being wasted on ineffective interventions
• Increased poverty/inequalities across our communities
• Population and economic decline
• Rising unemployment
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-91.1 Perth & Kinross Economic Partnership Serge Merone Effective 30 Apr, 2027
CTL-14.1 Regional Economy Strategy Serge Merone Effective 30 Apr, 2027
CTL-16.1 UK Shared Prosperity Fund Serge Merone Adequate 30 Apr, 2027
CTL-17.1 Scottish Local Authorities’ Economic Development (SLAED) Group Serge Merone Effective 30 Apr, 2027
CTL-18.1 Local Employability Partnership Serge Merone Effective 30 Apr, 2027
CTL-19.1 Tay Cities Deal and Partnership Serge Merone Effective 30 Apr, 2027
CTL-86.1 Ongoing monitoring of local economy through relevant data Serge Merone Effective 30 Apr, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Accelerated delivery of step change projects Serge Merone Completed 100 31 Mar, 2026
Deliver key impact projects Serge Merone In Progress 10 30 Mar, 2030
Develop place-based targeted skills and
employability interventions Steven MacDonald In Progress 10 31 Mar, 2027
15-Jun-2026 Page 9 of 24

Page 10

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Review of external employability activities (following
internal transformation review) including Local
Employability Partnership
Serge Merone Completed 100 31 Mar, 2026
15-Jun-2026 Page 10 of 24

Page 11

PKC Heatmap Report
SR-04 Our actions to tackle poverty and address the inequalities gap within Perth & Kinross are ineffective
Risk Categories:  People / Human Resource,
Finance
Risk Owner: Greg Boland Secondary Responsible Person(s):
Alan Taylor,David MacLuskey,Serge
Merone
Last Reviewed Date: 05 May,
2026
Next Review Date: 28 Aug,
2026
Organisation > Depute Chief Executive > Economy, Development & Planning
Organisation > Depute Chief Executive > Environment & Infrastructure
Organisation > Chief Executive > Education & Learning
Organisation > Chief Executive > Strategic Planning, People & Performance
Organisation > Depute Chief Executive > Customer & Digital Services
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Adequate
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Failure to align and prioritise budgets with locality and local demographic needs
• Failure to plan and resource effective interventions to address needs
• Incohesive partnership working
• Low wage and in work poverty
• Rising costs (including food, fuel, housing)
• The current economic climate and cost of living crisis
Consequences
• An increasing demand for services, which the Council may be unable to meet
• A widening of the inequalities gap within Perth and Kinross
• Poor or reduced health, social and economic wellbeing outcomes within our
communities
• Pressure on statutory services
• Reduction in Council income
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-18.2 Local Employability Partnership Serge Merone Effective 31 May, 2027
CTL-92.1 Future for Families Project Steven MacDonald Effective 31 May, 2027
CTL-253.1 Transformation and Change Projects governed by SPP&P Greg Boland Adequate 01 May, 2027
CTL-21.1 Joint Welfare Reform Steering Group Alan Taylor Adequate 31 May, 2027
CTL-22.1 Governance and internal control arrangements Greg Boland Adequate 30 Apr, 2027
CTL-25.1 Local Child Poverty Action Plan Greg Boland Effective 30 Apr, 2027
CTL-24.1 Welfare Rights - income maximisation Alan Taylor Effective 01 May, 2027
CTL-20.1 Local Outcomes Improvement Plan Greg Boland Adequate 30 Apr, 2027
CTL-246.1 Poverty Theme Board Greg Boland Adequate 01 May, 2027
CTL-76.1 Anti-Poverty Task Force Greg Boland Improvement Required 30 Apr, 2027
CTL-77.1 Poverty Working Group Greg Boland Adequate 01 Apr, 2027
15-Jun-2026 Page 11 of 24

Page 12

PKC Heatmap Report
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Developing and testing a Wellbeing Budgeting
approach around the Poverty priority Paul Smith In Progress 70 30 Sep, 2026
Development of a cash-first approach Paul Smith Completed 100 31 Dec, 2025
Development of an Anti-Poverty Task Force Action
Plan Paul Smith In Progress 70 30 Sep, 2026
Development of Good Food Strategy in relation to
Food Insecurity Pete Leonard In Progress 10 01 Apr, 2028
Fairer Futures Programme Paul Smith In Progress 55 30 Mar, 2027
Further refine and expand upon PK insights proof of
concept Paul Smith Completed 100 26 Sep, 2025
15-Jun-2026 Page 12 of 24

Page 13

PKC Heatmap Report
SR-05 The Transformation and Change programme does not meet expected outcomes and deliver the future, sustainable public services that our
communities need within available resources
Risk Categories:  Transformational, Audit,
Legislation and Compliance, Finance, People /
Human Resource
Risk Owner: Charlene Guild Last Reviewed Date: 14 May,
2026
Next Review Date: 31 Aug,
2026
Organisation > Chief Executive > Projects & Programmes
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
WITHIN APPETITE
The appetite benchmark score is
15.00 for this category
Causes
• Failure to develop and expand community connections and relationships
• Failure to effect the necessary cultural change within the organisation to
implement new ways of working
• Failure to engage effectively local communities to better identify need
• Failure to prioritise/align financial resources to need
• Inadequate local population data and business intelligence
• Incohesive partnership working (eg ineffective communication and data sharing)
• Insufficient resources and capacity
Consequences
• A widening of the inequalities gap within Perth and Kinross
• Inability to sustain current service delivery within future resource allocation
• Failure to comply with statutory duties
• Increased failure demand and resources being wasted on ineffective interventions
• Lack of confidence in Council / reputational loss
• Poor or reduced health, social and economic wellbeing outcomes within our
communities
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-251.1 Transformation & Change Communications and Engagement Plan Charlene Guild Adequate 03 May, 2027
CTL-252.1 Programme Management Office Project Monitoring Process Charlene Guild Effective 02 May, 2027
CTL-84.1 Transformation and Change governance structures Charlene Guild Adequate 03 May, 2027
CTL-29.1 Transformation and Change Strategy and Implementation Plan Charlene Guild Adequate 03 May, 2027
CTL-78.1 Corporate Plan 2022-27 Greg Boland Adequate 03 May, 2027
CTL-79.1 Equalities Mainstreaming Report Elaine Ritchie Effective 03 May, 2027
CTL-82.1 Financial Management and internal control Scott Walker Effective 14 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Development and roll out of locality based, multi-
disciplinary working groups Paul Smith In Progress 60 31 Mar, 2027
Further development activity with CPP Louisa Dott In Progress 75 30 Dec, 2026
Implementation of Phase 3 Transformation &
Improvement Team Charlene Guild In Progress 50 30 Sep, 2026
15-Jun-2026 Page 13 of 24

Page 14

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Introduction of a universal service design approach
across PKC in relation to Transformation & Change
activity
Charlene Guild In Progress 80 31 Mar, 2027
Mapping of interdependencies across the
Transformation & Change Programme Charlene Guild Completed 100 31 Dec, 2025
Review of T&C Strategy (2022 - 27) to align with
Corporate Plan key priorities Charlene Guild Completed 100 31 Oct, 2025
15-Jun-2026 Page 14 of 24

Page 15

PKC Heatmap Report
SR-07 Our operational response (in a non-public health related emergency situation) is inadequate or ineffective
Risk Categories:  Property and Assets, People /
Human Resource
Risk Owner: Greg Boland Secondary Responsible Person(s):
Elaine Ritchie
Last Reviewed Date: 12 Nov,
2025
Next Review Date: 31 Aug,
2026
Organisation > Chief Executive > Strategic Planning, People & Performance
Organisation > Depute Chief Executive > Housing & Communities
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• A lack of leadership and accountability
• Lack of preparedness to severe weather/emergencies
• • A lack of resources (people) to properly plan, co-ordinate implement an
appropriate response as per action plan
• Failure to test civil contingency/business continuity plans and processes
• Inadequate civil contingency/business continuity plans to cover relevant
emergency situations
• Inadequate local population data and business intelligence
• Incohesive partnership working
• Insufficient resources and capacity
Consequences
• Poor staff well-being (stress, burnout etc) leading to Retention challenges &
reduced productivity
• Damage to property and infrastructure
• Damage to the environment
• Detrimental impact on local economy
• Harm to health and wellbeing
• Legal claims and/or financial costs and penalties
• Potential injury/fatality
• Reputational damage/loss of public confidence
• Unable to deliver essential services
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-33.1 Tayside Local Resilience Partnership Thomas Glen Effective 30 Apr, 2027
CTL-34.1 Effective network of community support/response Elaine Ritchie Effective 30 Apr, 2027
CTL-35.1 Cohesive partnership working in place to identify and support
vulnerable people Sue Terras Adequate 30 Apr, 2027
CTL-31.1 Business Continuity / Contingency plans Sue Terras Effective 30 Apr, 2027
CTL-32.1 Appropriately skilled staff at Strategic, Tactical and Operational levels Sue Terras Effective 23 Apr, 2027
CTL-94.1 Emergency response structure Thomas Glen Effective 30 Apr, 2027
CTL-247.1 North of Scotland Resilience Partnership Thomas Glen Effective 30 Apr, 2027
CTL-248.1 Annual Programme of Training for Elected Members, ELT and SLT and
others Sue Terras Effective 23 Apr, 2027
CTL-87.1 Concurrent Events document Sue Terras Effective 30 Apr, 2027
Residual Solutions
15-Jun-2026 Page 15 of 24

Page 16

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Implement recommendations arising from Internal
Audit Sue Terras In Progress 90 30 Jun, 2026
Maintain currency of plans for foreseeable incidents Greg Boland In Progress 80 31 Dec, 2026
Updating of Concurrent Events Document Greg Boland Completed 100 28 Feb, 2026
Work with IT and HSCP to design and implement
Persons at Risk Database (PARD) Greg Boland In Progress 70 31 Dec, 2026
15-Jun-2026 Page 16 of 24

Page 17

PKC Heatmap Report
SR-08 There are insufficient financial resources to provide the services that our communities need.
Risk Categories:  Finance, Audit, Legislation and
Compliance, Contract and Procurement,
Environment, Information Technology and
Security, People / Human Resource, Property and
Assets, Reputation and Public Image,
Transformational
Risk Owner: Scott Walker Last Reviewed Date: 18 May,
2026
Next Review Date: 01 Aug,
2026
Organisation > Chief Executive > Finance & Business Support
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
9.00 for this category
Causes
• Poor decision making
• Inappropriate use of resources
• Change in political direction
• Changing demographics
• Structural deficit in current revenue budget
• High level of construction inflation impacting capital budget
• Cyber defences being breached
• Failure to deliver planned savings due to a reduction in local government
funding/financial settlement
• Failure to prioritise/align financial resources to need
• Failure to transform Council services
• High levels of inflation
• Increased ring-fencing of funding
• Increasing and/or more complex needs
• Increase in expenditure
• Movements in financial settlement
• Movements in income
• Reduction in local government funding
• The current economic climate and cost of living crisis
Consequences
• Increased pressure on staff
• Failure to achieve best value
• Deterioration in quality and safety of assets
• Failure to deliver a balanced budget
• Increased costs through failure demand
• Increased pressures on other parts of public sector or 3rd sector
• Increase in future savings and significant reduction in the Council's reserves
• Lack of confidence in Council / reputational loss
• Legal /financial claims and penalties for breach of duties and/or injury
• Poor outcomes - economic, environmental and social wellbeing
• Reduction in availability/quality of services
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-63.1 Medium Term Financial Plan Scott Walker Adequate 31 May, 2027
CTL-64.1 Annual Accounts and Statutory Audit Processes Scott Walker Effective 31 May, 2027
CTL-95.1 Three Year Revenue Budget Scott Walker Effective 31 May, 2027
CTL-52.2 Strategic Investment Advisory Group Scott Walker Effective 31 May, 2027
CTL-36.1 Financial Strategy and Principles Scott Walker Effective 31 May, 2027
CTL-37.1 Transformation and Change Programme Charlene Guild Adequate 31 May, 2027
15-Jun-2026 Page 17 of 24

Page 18

PKC Heatmap Report
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-38.1 Capital Budget Scott Walker Effective 31 May, 2027
CTL-39.1 Treasury Management Scott Walker Adequate 31 May, 2027
CTL-40.1 Revenue and Capital monitoring Scott Walker Adequate 31 May, 2027
CTL-41.1 Continuous engagement with management and elected members, e.g.
Executive Leadership Group, Conveners, BRGs. Scott Walker Effective 31 May, 2027
CTL-443.1 No Purchase Order /No Payment Scott Walker Effective 18 May, 2027
CTL-204.1 Reserves Strategy Scott Walker Adequate 31 May, 2027
CTL-447.1 Proactive asset management - Corporate Strategy and plans Scott Walker Improvement Required 11 Dec, 2026
CTL-88.1 Financial Regulations and Supplementary Guidance Scott Walker Effective 31 May, 2027
CTL-211.1 Annual Governance & Assurance Statement Jacqueline Clark Effective 18 May, 2027
CTL-212.1 Investment Blueprint Scott Walker Effective 18 May, 2027
CTL-213.1 Budget Briefing Communications Scott Walker Effective 18 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Consolidation of finance function to transformation
the finance service Scott Walker In Progress 75 31 Mar, 2027
Develop generational ( 25+ year) strategic plan Greg Boland Not Started 0 31 Aug, 2027
Improved analysis of financial data (heatmap project) Scott Walker In Progress 70 31 Dec, 2026
No Purchase Order /No Payment Project Scott Walker Completed 100 31 Mar, 2026
Review and rationalisation of operational estate John Beveridge In Progress 5 30 Jun, 2036
Review and rationalisation of school estate David MacLuskey In Progress 1 30 Jun, 2036
Whistleblowing Communications plan Jacqueline Clark Completed 100 30 Jun, 2025
15-Jun-2026 Page 18 of 24

Page 19

PKC Heatmap Report
SR-09 We have insufficient capacity and skills within the workforce to deliver the services that our communities need
Risk Categories:  People / Human Resource,
Reputation and Public Image
Risk Owner: Greg Boland Secondary Responsible Person(s):
Pauline Johnstone
Last Reviewed Date: 28 May,
2026
Next Review Date: 31 Aug,
2026
Organisation > Chief Executive > Strategic Planning, People & Performance
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Difficulties with recruitment, shortages in the labour market
• Difficulties with retention, pay and grade, impact of hybrid working on existing
workforce
• Inadequate financial resources
• Inadequate workforce planning (including succession planning, policies &
strategies, vacancies management, wage analysis)
• Increase in sickness absence, reduced wellbeing
• Lack of knowledge and expertise in particular areas
• Workforce reduction through restructuring/consolidation as part of
transformation and change programme
Consequences
• Detrimental impact on environmental, economic and health and wellbeing
outcomes across Perth and Kinross
• Failure to deliver strategic objectives
• Failure to deliver the services that communities need / poor quality services
• Legal /financial claims and penalties for breach of duties and/or injury
• Poor staff morale, health and wellbeing/ increased staff absence
• Reputational damage/Council being seen as an unattractive employer
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-42.1 People and Culture Strategy 2024-2028 Pauline Johnstone Effective 31 May, 2027
CTL-43.1 Hybrid/new ways of working: guidance and operating models
established Pauline Johnstone Effective 31 May, 2027
CTL-44.1 Workforce planning procedures and guidance Pauline Johnstone Adequate 31 May, 2027
CTL-45.1 Modern Apprentice & Graduate trainee schemes Pauline Johnstone Effective 31 May, 2027
CTL-46.1 Leadership skills training Pauline Johnstone Adequate 31 May, 2027
CTL-47.1 Organisational development plan Pauline Johnstone Adequate 31 May, 2027
CTL-48.1 Wellbeing/resilience/support (including links to partner organisation
support resources for care workers) Pauline Johnstone Effective 31 May, 2027
CTL-49.1 Leadership Development Programme Pauline Johnstone Adequate 31 May, 2027
CTL-50.1 Employees Joint Consultative Committee Pauline Johnstone Effective 31 May, 2027
CTL-51.1 Joint Negotiating Committee for Teaching Staff Pauline Johnstone Effective 31 May, 2027
CTL-393.1 Leadership Development Strategy Pauline Johnstone Adequate 01 May, 2027
15-Jun-2026 Page 19 of 24

Page 20

PKC Heatmap Report
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-126.1 Employee Relations & Wellbeing Team Pauline Johnstone Adequate 31 May, 2027
CTL-127.1 Workforce Planning Themed Board Greg Boland Adequate 31 May, 2027
CTL-89.1 Health and Wellbeing Plan Pauline Johnstone Improvement Required 31 May, 2027
CTL-249.1 People Analytics Dashboard Pauline Johnstone Adequate 31 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Create a health and wellbeing pathway for change
across PKC and the P&K HSCP which identifies the
elements of a healthy workforce.
Pauline Johnstone In Progress 70 31 Dec, 2026
Deliver the People and Culture Strategy Action Plan
which is due for approval at Finance and Resources
Committee
Pauline Johnstone In Progress 90 30 Jun, 2026
15-Jun-2026 Page 20 of 24

Page 21

PKC Heatmap Report
SR-010 Council buildings and other assets are not safe, fit for purpose or providing best value
Risk Categories:  Property and Assets, People /
Human Resource
Risk Owner: Scott Walker Secondary Responsible Person(s):
Alan Taylor,Elaine Ritchie,Fraser
Crofts,John Beveridge
Last Reviewed Date: 14 May,
2026
Next Review Date: 29 Aug,
2027
Organisation > Depute Chief Executive > Environment & Infrastructure
Organisation > Chief Executive > Finance & Business Support
Organisation > Depute Chief Executive > Property Services
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Adequate
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Climate change and increase in extreme weather events
• Failure to respond appropriately to H&S concerns raised through national
enquiries/reports
• Failure to identify future investment where needed
• Inadequate maintenance and repair
• Ineffective asset management and planning
• insufficient resource and capacity
Consequences
• Detrimental impact upon ability to deliver or quality of services
• Increased costs due to insurance claims and maintenance
• Injuries/fatalities
• Legal /financial claims and penalties for breach of duties and/or injury
• Reputational damage/loss of public confidence
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-90.1 Condition and suitability surveys Scott Walker Effective 14 May, 2027
CTL-441.1 30 Year Rolling Investment Plan Scott Walker Adequate 14 May, 2027
CTL-442.1 Annual Status Report Gregor Walker Effective 14 May, 2027
CTL-55.1 Corporate Asset Management Framework Scott Walker Effective 14 May, 2027
CTL-52.1 Strategic Investment Advisory Group Scott Walker Effective 14 May, 2027
CTL-75.1 Asset Maintenance programmes Gregor Walker Adequate 14 May, 2027
CTL-54.1 Asset strategies, plans and performance information Scott Walker Effective 14 May, 2027
CTL-53.1 Asset Management Boards Scott Walker Adequate 14 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
30 year investment plan - Revision for 2025/26 Scott Walker Completed 100 31 Jan, 2026
Progress any actions from BV Audit (Awaiting
Outcomes) Gregor Walker Not Started 0 31 Mar, 2027
15-Jun-2026 Page 21 of 24

Page 22

PKC Heatmap Report
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Revision of 30 Year Investment Plan & Asset Status
Reports Gregor Walker In Progress 10 31 Jan, 2027
Status reports for 2024/25 for key assets and report
to appropriate Boards and/or Committees Scott Walker Completed 100 30 Oct, 2025
15-Jun-2026 Page 22 of 24

Page 23

PKC Heatmap Report
SR-011 The health and safety of staff and the public is not adequately protected
Risk Categories:  Audit, Legislation and
Compliance, People / Human Resource
Risk Owner: Greg Boland Secondary Responsible Person(s):
Pauline Johnstone
Last Reviewed Date: 28 Apr,
2026
Next Review Date: 31 Jul,
2026
Organisation > Chief Executive > Strategic Planning, People & Performance
I Inherent Risk Assessment
R Residual Risk Assessment
Probability
I
R
Impact
Individual Heatmap
Effectiveness of control
R Effective
Risk Appetite
OUT OF APPETITE
The appetite benchmark score is
5.00 for this category
Causes
• Health & safety implications of new ways of working (e.g. hybrid / remote) not
fully known/understood
• Inadequate resources and capacity
• Ineffective monitoring, reporting and response
• Lack of understanding /failure to apply legislation
• Under-investment in training and controls
Consequences
• Detrimental impact on health and wellbeing
• Legal /financial claims and penalties for breach of duties and/or injury or death
• Poor working environment and work life balance
• Potential injury/fatality
• Reputational damage/loss of confidence
Residual Controls
Control Code Control Title Risk Control Owner Control Effectiveness Next Review Date
CTL-56.1 Health & Safety training and communication Lorna Hamilton Effective 01 May, 2027
CTL-57.1 Robust Corporate Occupational Health & Safety Policy with supporting
arrangement and guidance documents Lorna Hamilton Adequate 01 May, 2027
CTL-58.1 Corporate Health & Safety Team Lorna Hamilton Effective 01 May, 2027
CTL-59.1 Employees Joint Consultative Committee and Service based Health and
Safety Committees Pauline Johnstone Effective 01 May, 2027
CTL-60.1 Safe Systems of Work Lorna Hamilton Effective 01 May, 2027
CTL-61.1 Partnership working with Director of Public Health ongoing Pauline Johnstone Effective 01 May, 2027
Residual Solutions
Action Title Responsible Officer Action Status % Completed Target Completion
Date Performance
Develop an approach to replace Service Consultative
Committees with one Strategic Committee Pauline Johnstone Completed 100 30 Nov, 2025
Implementation of Occupational Health and Safety
policy and supporting topic specific arrangements Lorna Hamilton In Progress 90 31 Mar, 2027
Monitoring and auditing of health and safety
practices and procedures both by Management and
Corporate Health & Safety Team
Lorna Hamilton Deferred 25 31 Mar, 2027
15-Jun-2026 Page 23 of 24

Page 24

The entire contents of this document are subject to copyright with all rights reserved. 
All copyrightable text and graphics, the selection, arrangement and presentation of all information and
the overall design of the document are the sole and exclusive property of Riskonnect Inc.
Copyright © 2026 Riskonnect Inc. All rights reserved.