Democracy Spraffa

Update on Recent Scottish Ministers Section 36 Wind Farm Decision

Argyll and Bute Council · 23 August 2023
Back to Planning, Protective Services and Licensing Committee — 23 August 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ARGYLL AND BUTE COUNCIL
DEVELOPMENT AND ECONOMIC GROWTH 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE – 23RD AUGUST 2023 
UPDATE ON RECENT SCOTTISH MINISTERS SECTION 36 WIND FARM DECISION
____________________________________________________________________________ 
OUR REFERENCE: 19/02424/S36 
ECU REFERENCE: ECU00001957 
DPEA REFERENCE: WIN-130-5 
CASE DETAIL: CONSENT UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 AND
DEEMED PLANNING PERMISSION UNDER SECTION 57(2) OF THE
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 FOR THE
CONSTRUCTION AND OPERATION OF SHEIRDRIM RENEWABLE
ENERGY DEVELOPMENT 
SITE ADDRESS: SHEIRDRIM RENEWABLE ENERGY DEVELOPMENT (APPROX 10KM
SOUTH-WEST OF TARBERT), LAND AT GARTNAGRENACH FOREST,
WHITEHOUSE, ARGYLL & BUTE 
APPLICANT: SLR CONSULTING LIMITED ON BEHALF OF SCOTTISHPOWER
RENEWABLES (UK) LIMITED 
STATUS: REFUSED BY SCOTTISH MINISTERS ON 26TH JUNE 2023 
____________________________________________________________________________ 
A) INTRODUCTION 
In Scotland, any application to construct or operate an onshore power generating station,
with an installed capacity of over 50 megawatts (MW) requires the consent of Scottish
Ministers under Section 36 of the Electricity Act 1989. Any ministerial authorisation given
includes a ‘deemed planning permission’ and in these circumstances there is then no
requirement for a planning application to be made to the Council as Planning Authority. The
Council’s role in this process is one of a consultee along with various other consultation
bodies. It is open to the Council to either support or object to the proposal, and to recommend
conditions it would wish to see imposed if authorisation is given by the Scottish Government. 
In the event of an objection being raised by the Council, as was the case with this proposal,
the Scottish Ministers are obliged to convene a Public Local Inquiry (PLI). The Inquiry was
conducted by a Reporter(s) appointed by the Directorate for Planning and Environmental
Appeals. 
This report summarises the recent decision made by Scottish Ministers to REFUSE Section
36 consent and deemed planning permission for Sheirdrim Renewable Energy Development.

Page 2

B) RECOMMENDATION 
Members are asked to note the contents of the report. 
C) REPORTERS CONCLUSIONS AND RECOMMENDATION TO SCOTTISH MINISTERS 
Reporter’s Conclusions 
Although the proposal would contribute to meeting national targets for reducing greenhouse
gas emissions and generating renewable energy, it would also bring its own impacts to the
locality where it is proposed. For the most part the environmental effects would not be
significant or could be made so by mitigation and/or imposing conditions. This would not
resolve the landscape and visual (including cumulative) effects, albeit that those would be
localised. However, in our judgement, the benefits of meeting national energy and climate
change policy are preferable in the overall balance, as set out in NPF4 (National Planning
Framework 4) Policy 11 e). 
However, the applicant’s assessment has not fully considered the effects of the proposal on
the setting of Dun Skeig scheduled monument. The proposal would result in significant
adverse impacts on the integrity of the setting of Dun Skeig scheduled monument, which
could not be mitigated without significantly changing the proposal. Consequently, the
proposal is contrary to NPF4 Policy 7 h). No compelling evidence persuades us that there
any exceptional circumstances under NPF4 Policy 7 h) iii or elsewhere. The proposal is also
contrary to the Historic Environment Policy for Scotland. Despite our applying significant
weight to the meeting of greenhouse gas reduction and renewable energy targets this matter
would present issues for compliance with NPF4 Policy 11 e) vii. 
Therefore, despite many factors being in the proposal’s favour, its significant adverse impacts
on the integrity of the setting of Dun Skeig scheduled monument alone lead us to conclude
that the proposal would not be acceptable overall.                                              
Reporters Recommendation to Scottish Ministers 
The Reporter therefore recommends that, consent under section 36 of the Electricity Act 1989
and deemed planning permission under section 57 of the Town and Country Planning
(Scotland) Act 1997 should be refused. Should Scottish Ministers disagree with this
recommendation, they recommend that the conditions proposed in Appendix A of their report
should be attached to the consent. 
The Scottish Ministers’ Conclusions 
Reasoned Conclusions on the Environment 
The Scottish Ministers are satisfied that the EIA Report and its AI (Additional Information)
2020 and AI 2021 have been produced in accordance with the EIA Regulations and that the
relevant procedures regarding publicity and consultation laid down in those Regulations have
been followed. 
The Scottish Ministers have fully considered the EIA Report and the AI 2020 and AI 2021,
the consultation responses, representations, the findings, conclusions, and recommendation
of the PI Report and its Supplementary Report and are satisfied that the environmental
impacts of the proposed Development have been sufficiently assessed. The Scottish

Page 3

Ministers have taken the environmental information into account when reaching their
decision. 
Taking into account the above assessment the Scottish Ministers consider there would be
significant local landscape and visual effects and significant effects on the setting of Dun
Skeig scheduled monument, neither of which can be mitigated. 
The Scottish Ministers are satisfied, having regard to current knowledge and methods of
assessment, that this reasoned conclusion addresses the likely significant effects of the
proposed Development on the environment. The Scottish Ministers are satisfied that this
reasoned conclusion is up to date. 
The Scottish Ministers Determination 
As set out above, the seriousness of climate change, its potential effects and the need to cut
carbon dioxide emissions, remain a priority for the Scottish Ministers. The Climate Change
(Emissions Reduction Targets) (Scotland) Act 2019 (the “2019 Act”) sets a target for Scotland
to be carbon-neutral, meaning net-zero CO2, by 2045 at the latest. Additionally, the 2019 Act
sets out two interim targets to reduce emissions by 75% by 2030 and by 90% by 2040.
Scotland’s renewable energy and climate change targets, energy policies and planning
policies are all relevant considerations when weighing up the proposed Development. NPF4,
Scotland’s Energy Strategy and the Onshore Wind Policy Statement make it clear that
renewable energy deployment remains a priority of the Scottish Government. These are all
matters which should be afforded significant weight in favour of the proposed Development. 
The Scottish Ministers consider that the proposed Development, if deployed, would create
net economic benefits and deliver significant renewable energy benefits that would support
climate change mitigation and are wholly in accordance with Scottish Government’s climate
change ambitions. The proposed Development in these respects would contribute to
sustainable development and this has been taken into account when reaching a decision.
These benefits however must be considered carefully in the context of the negative impacts
on the historic and natural environment, particularly on the setting of Dun Skeig scheduled
monument, and whether or not, on balance, they are acceptable. 
The Scottish Ministers acknowledge, in accordance with both NPF4 and the OWPS, that
meeting our climate ambitions will require a rapid transformation across all sectors of our
economy and society, however this does not negate the continuing requirement to ensure
that the right development happens in the right place. 
The Scottish Ministers, having considered the Application, the EIA Report, the AI 2020, AI
2021, consultation responses and public representations alongside the Reporters’
considerations and subsequent conclusions, consider that although the significant local,
landscape and visual impacts would be acceptable in the context of the net economic benefits
and the significant renewable energy benefits that would be delivered if the proposed
Development were to be deployed, the impacts on the historic environment and the integrity
of the setting of Dun Skeig scheduled monument would not. 
The significant adverse impact on the setting of Dun Skeig scheduled monument and
resulting impact on how it is understood and enjoyed, and the experience of its benefits,
would not be secured for present and future generations if the proposed Development were
consented. Even taking into account the significant support assigned by NPF4 to the
proposed Development and its status as national development, this ultimately leads the

Page 4

Scottish Ministers to the conclusion that despite the many factors in favour of the proposed
Development, this is not the right development in the right place and the proposed
Development is therefore not acceptable overall. 
The Scottish Ministers therefore consider the Application for consent under Section 36 of the
Electricity Act 1989 for the construction and operation of Sheirdrim Wind Farm, wholly within
the planning authority area of Argyll and Bute Council, should be refused. 
The Scottish Ministers' decision is final, subject to the right of any aggrieved person to apply
to the Court of Session for judicial review. Judicial review is the mechanism by which the
Court of Session supervises the exercise of administrative functions, including how the
Scottish Ministers exercise their statutory function to determine applications for consent. 
The Reporters Inquiry Report and Scottish Ministers decision can be viewed on the DPEA
(Directorate of Planning Environmental Appeals) website at the following link: 
Scottish Government - DPEA - Case Details (scotland.gov.uk) 
D)    IMPLICATIONS 
Policy: None.
Financial: None.  
Personnel: None   
Equal Opportunities: None 
Author:  Arlene Knox  Date: 19th July 2023 