Democracy Spraffa

24-03 Multi-Agency Screening Hub (MASH)

Perth and Kinross Council · 1 December 2025
Back to Audit and Risk Committee — 1 December 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
Internal Audit Report
Perth and Kinross Council
24-03 Multi-Agency Screening Hub (MASH) 
October 2025 
Final Report
(Report No. 25/333) 
Legal and Governance
Corporate and Democratic Services
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH

Page 2

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
24-03 Multi-Agency Screening Hub (MASH)
Contents by Section 
1. Introduction
2. Executive Summary         
3. Audit Background Information        
4. Scope and Limitations         
5. Assessment of the Control Environment      
6. Summary of Findings         
7. Conclusions          
8. Acknowledgement         
9. Action Implementation & Follow Up     
10. Management Action Plan 
11. Authorisation
12. Distribution
13. Assessment Definitions

Page 3

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
1.  Introduction 
1.1  The audit of Multi-Agency Screening Hub (MASH) was undertaken as part of
the Internal Audit Plan for 2024-25, which was approved by the Audit & Risk
Committee on the 24th of June 2024. The period under review for the purposes
of the audit exercise was financial years 2022-23, 2023-24 and 2024-25. 
1.2  The indicative scope for the audit was to review the effectiveness of the
arrangements in place.
1.3  This audit is linked to the Strategic Risk Register SR-01 “We fail to protect
children and vulnerable adults from harm”, which was reported as Priority 1,
Very High on the 17th of June 2025. 
2.  Executive Summary 
2.1  The audit has found that reasonable assurance can be placed on the Council’s
internal controls in relation to the arrangements in place to support the Multi-
Agency Screening Hub (MASH).  
2.2  There are seven actions arising from the findings in Section 6. An action plan
is included at Section 10. Once these actions are completed, Internal Audit
should be able to place substantial assurance on the arrangements in place. 
3.  Audit Background Information 
3.1   Children (Scotland) Act 1995, Section 22 states that “A local authority shall
safeguard and promote the welfare of children in their area who are in need;
and so far as is consistent with that duty, promote the upbringing of such
children by their families, by providing a range and level of services appropriate
to the children’s needs.” 
3.2    Getting It Right For Every Child (GIRFEC) is Scotland’s national approach to
promoting, supporting, and safeguarding the wellbeing of all children and young
people. It provides a consistent framework, shared language and common
understanding of wellbeing. GIRFEC puts the child or young person at the heart
and helps children and young people get the right support from the right people
at the right time. 
3.3 Children and young people’s needs and emerging risks require to be
considered along the continuum of their lifespan. Risk is a dynamic concept
that can be multi-dimensional in character. Risks may be reduced by parents
or carers or through early identification, intervention and support from universal
services. At times, a number of services or agencies may need to respond
together as part of a co-ordinated intervention.

Page 4

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
3.4    The Multi-Agency Screening Hub (MASH) is a Social Work and Third Sector
Support Forum, which exists in a form of weekly meetings hosted by Children
and Families Social Work and attended by a range of agencies and services
who can offer support and advice to families at an early or earlier stage. 
3.5     Currently, families in need of some additional support at a lower level require to
be referred into MASH through the Child Protection Duty Team (CPDT) in
Children and Families Services. 
4.  Scope and Limitations 
4.1 The Audit has reviewed the effectiveness of the MASH in providing allocation
of support to babies, children, young people and their families, and the
adequacy of its arrangements in place.
4.2  To arrive at an opinion, the review included interviews with key officers,
document reviews and analysis of the meetings recordings and of relevant
performance indicators.
4.3 There were no limitations identified that would impact the Audit. However, we
were not able to comment on the effectiveness of the arrangements of the
partners’ agencies.
4.4  The details of the control objectives reviewed and Internal Audit’s assessment
of their strength of control in each area are contained within Section 5 of this
report. 
5.  Assessment of the Control Environment 
5.1  The table below contains a summary of the findings against each control
objective and Internal Audit’s assessment of the adequacy and effectiveness of
the controls in place to meet each of the objectives agreed for this audit. Further
details, including any improvement actions, are set out in the Management
Action Plan.
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1 To ensure the adequacy of the
arrangements in place to support the
effective work of the Multi-Agency
Screening Hub.   
1 1  5  Reasonable
assurance 
5.2  The auditor has assessed that reasonable assurance can be placed on controls
overall in relation to the Multi-Agency Screening Hub (MASH) from the audit.
Meaning: “There is a generally sound system of governance, risk management
and control in place. Some issues, non-compliance or scope for improvement

Page 5

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
were identified which may put at risk the achievement of objectives in the area
audited”.
5.3  A summary of the key findings and actions are provided in section 6, please
note however, the following areas of good practice which have been highlighted
during the audit:
5.4  MASH has proven to be very effective in providing timely and efficient
allocation of support to babies, children, young people and their families. The
meetings are held frequently, typically weekly, and proceed even when a
small number of cases, such as two, are on the agenda, reflecting a strong
commitment to the responsiveness. Initial referral screening is done by a
qualified Social Worker in the CPDT. Over the course of a year, a substantial
number of children are discussed (235 on average), with all cases allocated to
the most appropriate agencies to ensure timely and targeted support. 
5.5 The Service has promptly recognised a shortage of the staff resource and
took proactive measures to address it. The targeted recruitment of two MASH
employees allowed the Service to avoid disruption to the workflows and to
ensure consistent service quality. 
5.6 The process actively contributes to improved Child Protection outcomes
through early intervention. By addressing concerns at such early stage, case
risks are effectively mitigated, preventing their escalation into more serious
cases and avoiding the need for statutory Social Work intervention. MASH
also allows the allocation of cases that would otherwise be declined by the
CPDT, preventing avoidable harm and encouraging development of more
sustainable outcomes for the families and communities. 
It is illustrative that, although the number of Child Concern Reports is
increasing every year (from 6234 in 2020-21 to 8454 in 2024-25), it does not
result in a subsequent increase in the later stages of child protection
interventions (Inter-Agency Referral Discussions, Child Protection Planning
Meetings, Joint Investigative Interviews, Child Protection Orders etc). In fact, it
appears to be the opposite - the numbers for those later intervention stages,
as well as for the children being placed on the Child Protection Register (from
91 in 2021-22 to 66 in 2024-25), are decreasing every year (as could be seen
in the table below):

Page 6

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
5.7 All MASH activities and decisions are aligned with key national principles and
strategic initiatives, such as GIRFEC principles, Whole Family Wellbeing
programme and The Promise initiative, as well as with the United Nations
Convention on the Rights of the Child. This ensures that the support allocated
through the MASH remains relevant and contributory to broader governmental
objectives. 
5.8 All the MASH agencies possess adequate competencies. They are well-
established organisations with years of effective collaboration with PKC.
These long-standing relationships provide operational stability and reliability.
Additionally, all of the partners have access to Child Protection Committee
(CPC) trainings. This access promotes shared knowledge and supports
continuous professional development. For partners with whom contractual
agreements are in place, these documents also define expectations towards
partners’ competencies. 
5.9 Documentation practices are upheld to support accountability, transparency,
traceability and informed decision-making.  The records exist not only in the
form of the MASH Register, but also as meeting recordings, meeting
transcripts and MOSAIC case notes. 
5.10 There is a range of data protection documents in place, which provide clarity
and promote accountability. A formal Memorandum of Understanding (MOU)
was developed in April 2025 to clearly define expectations and responsibilities
in data handling. The MOU is comprehensive and ensures compliance with
data protection laws. Data Protection framework is also outlined in Contracts/
Service Level Agreements (SLAs). 
5.11 A Privacy Notice has been developed and formally published to ensure full
transparency regarding the collection, use and safeguarding of personal
information. The Notice clearly outlines the commitments to data protection
and the lawful basis for processing information. Making the document
accessible publicly helps to build trust with stakeholders and reinforces
compliance with data protection laws, as well as with best practices. 
5.12 Adherence to information minimisation principles ensures that only relevant
and necessary data is shared. Secure communication channels are utilised at
all times. Partner agencies are not granted direct access to the PKC’s case
management system (MOSAIC). Personal passwords are never disclosed,
maintaining the high standards of confidentiality and data security. 
5.13 Accountability is reinforced by CPDT remaining involved for some period after
allocation and by talking to the agencies prior to case closure to confirm case
status, where appropriate. It is also supported by informing the referrers of
allocation outcomes to facilitate their continuous engagement in the process.
Importantly, there is also an option to escalate the cases back to the CPDT. 
5.14 Although MASH is a relatively new project, the service has already initiated a
review of its effectiveness, receiving positive feedback from the partners and
confirmation of its significant strengths through the Desktop Audit. Those

Page 7

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
reviews resulted in recognition and implementation of needed improvements
(e.g., establishment of the Memorandum of Understanding, inclusion of a
distinct consent for MASH discussion within referral forms, procedural
updates to the outcomes distribution process etc), facilitating adaptive
learning and continuous improvement. 
5.15 The MASH strengthens inter-agency relationships and improves inter-agency
communication. It also provides a platform for cooperation and effective
collaboration for the agencies, inspiring their joint projects and avoiding
duplication of efforts. 
6.  Summary of Findings 
6.1  In addition to the good practice highlighted above, below is a summary of key
findings and actions, which are reflected in the Management Action Plan,
detailed in section 10.   
6.2  There are some discrepancies between the Memorandum of
Understanding (MOU) and the actual practice: “No information is shared by email
prior to the MASH other than the names of the children/young people being
discussed”. – This statement appears to be inaccurate as with the list of
children’s and young people’s names, the partners also receive some other
personal data, which includes their dates of birth, addresses, school’s details and
their parents’ names, as well as the link to the main MASH data file (MASHUP
Register). Such practice appears to breach the terms of the MOU, so it would be
recommended to re-align the document with the practice by reviewing what data
is getting shared prior to the MASH and, if needed, to amend the Memorandum
accordingly. It is also advisable to strengthen the Register’s security by applying
password protection and thereby preventing unauthorised data damage or
alteration. 
- One of the agencies was not removed from the correspondence list and
continued to receive sensitive information after their exit of the MASH group. It is
acknowledged and appreciated that CPDT Team Leader has requested their
removal, however it is recommended to always ensure that it is actioned as
otherwise this would lead to unauthorised disclosure, breach of confidentiality
obligations and non-compliance with data protection laws. The consequences
might also include potential legal or regulatory actions.
- It was observed that, on one occasion, a separate discussion between the two
members was captured at the end of the meeting recording due to the belief that
the recording had already stopped. It would be recommended to consistently
verify that the recording has concluded before proceeding to any separate
discussion as otherwise this could result in violation of confidentiality policies and
of data protection regulations.

Page 8

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
[Action Point 1] 
6.3  Data recording is not always accurate, comprehensive and consistent:
- Some key data is missing or inaccurate (gaps/ blank cells; data recorded or
copied incorrectly). 
- Data extracted from MOSAIC does not appear to be checked for common
sense before being transferred onto the Register/MASHUP List and
distributed to the partners, resulting in errors in key information and
misleading the agencies. 
- Data for the Register does not appear to be cross-checked with data on the
Referral forms, resulting in discrepancies between the two of them. 
- Some outcomes are missing or inaccurate (blank cells; if multiple outcomes,
not all allocations are always recorded; the background recorded instead of
the allocation; some discrepancies between the document and the outcomes
expressed at the meeting). 
This could lead to misallocation of the cases, to partners receiving misleading
information, and to cases delays and escalations. There is also a risk of a
reputational damage and of partners’ disengagement. 
[Action Point 2] 
6.4  Please note that there are five other minor actions for the improvement in the
control environment which are included within the management action plan.              
[Action Points 3-7] 
7.  Conclusion 
7.1  The Internal Audit review is able to place reasonable assurance on the overall
control environment for the Multi-Agency Screening Hub (MASH). The agreed
actions, once implemented, should enable Internal Audit to place substantial
assurance on these. 
8.  Acknowledgements 
8.1  Internal Audit would like to thank all officers who were involved in this audit,
particularly: 
Sharon Cooper, Service Manager - Children’s Services

Page 9

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
Sheila Wilson, Improvement Officer - Children’s Services
Debbie Reilly-Davidson, Team Leader - Child Protection Duty Team. 
9.  Action Implementation & Follow up 
9.1  Responsibility for the maintenance of adequate and effective controls rests with
management. Where the audit has identified areas for management action,
these are identified in the Management Action Plan. Where a decision is taken
by management not to act in response to finding from this review, it is the
responsibility of management to assess and accept the risk arising from non-
implementation. 
9.2  Achievement of the agreed actions is monitored through Internal Audit’s ‘follow
up’ arrangements.

Page 10

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
10.  Management Action Plan 
Action
Point
Para.
No Finding Risk
Rating Agreed Action & Evidence Action Owner
Target
Completio
n Date
1 6.2 There are some discrepancies
between the Memorandum of
Understanding and the actual
practice:
- “No information is shared by
email prior to the MASH other than
the names of the children/young
people being discussed”. – This
statement appears to be
inaccurate as with the list of
children’s and young people’s
names, the partners also receive
some other personal data, which
includes their dates of birth,
addresses, school’s details and
their parents’ names, as well as
the link to the main MASH data file
(“MASHUP Register”). Such
practice appears to breach the
terms of the MOU, so it would be
recommended to re-align the
3  
Agreed action:MOU will be
updated (as the list of children,
as well as their personal data
on the MASH spreadsheet, is
available for participants).
Agreed evidence:
• Updated MOU.
• Updated format of
invites to planned
partners. 
S Wilson,
Improvement
Officer 
December
2025

Page 11

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
document with the practice by
reviewing what data is getting
shared prior to the MASH and, if
needed, to amend the
Memorandum accordingly. It is
also advisable to strengthen the
Register’s security by applying
password protection and thereby
preventing unauthorised data
damage or alteration. 
- One of the agencies was not
removed from the correspondence
list and continued to receive
sensitive information after their
exit of the MASH group. It is
acknowledged and appreciated
that CPDT Team Leader has
requested their removal, however
it is recommended to always
ensure that it gets actioned as
otherwise this would lead to
unauthorised disclosure, breach of
confidentiality obligations and non-
compliance with data protection
laws. 
Agreed action:A review
process will be put in place to
ensure this does not happen
again. Partners will be
reminded to advise the MASH
if they are removing
themselves from MASH and
they will be deleted from MASH
systems and processes. 
Agreed evidence:
• An up-to-date list of
MASH planned partners.
• A reminder email sent to
the partners. Exit 
D Reilly-
Davidson,CPDT
Team Leader 
November
2025

Page 12

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
- It was observed, on one
occasion, that a separate
discussion between the two
members was captured at the end
of the meeting recording due to
the belief that the recording had
already stopped. It would be
recommended to consistently
verify that the recording has
concluded before proceeding to
any separate discussion as
otherwise this could result in
violation of confidentiality policies
and of data protection regulations.
process described in
MASH Guidance.
Agreed action:
Meeting will consistently
terminate after MASH
discussions have taken place.
Any separate discussion
necessary between planned
partners will take place as a
separate Teams meeting and
therefore will not be recorded.
A designated person will be
responsible for ensuring that
the Teams meeting is ended
immediately after the formal
discussion concludes. 
Agreed evidence:
A designation of a responsible
person. No further recordings
of conversations not related to
MASH discussions. 
D Reilly-Davidson,
CPDT Team
Leader 
November
2025
2 6.3 Data recording is not always
accurate, comprehensive and
consistent:
- Some key data is missing
or inaccurate (gaps/ blank
cells; data recorded or
copied incorrectly). 
2 Agreed action:
• Admin Business
Manager will be made
aware of admin errors.
• MASH workers will be
responsible for accurate
recording of information.
• Mosaic process may
eliminate the need for a
MASH spreadsheet
J Cooper, Senior
Business Officer 
D Reilly-Davidson,
CPDT Team
Leader 
November
2025

Page 13

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
- Data extracted from
MOSAIC does not appear
to be checked for common
sense before being
transferred onto the
Register/MASHUP List and
distributed to the partners,
resulting in errors in key
information and misleading
the agencies. 
- Data for the Register does
not appear to be cross-
checked with data on the
Referral forms, resulting in
discrepancies between the
two of them. 
- Some outcomes are
missing or inaccurate
(blank cells; if multiple, not
all allocations are always
recorded; the background
recorded instead of the
allocation; some
discrepancies between the
document and the
which will reduce the
need for manual input. 
Agreed evidence:
• Data recording roles and
responsibilities outlined
in MASH procedure or
MASH Guidance.
• Periodical verification of
the accurateness of case
notes and MASH
spreadsheet entries.

Page 14

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
outcomes expressed at the
meeting).
3 6.4 In order to ensure adequate
competencies of any future MASH
partners, it would be
advantageous to either formulate
a MASH entry criteria or to create
an entry QA Checklist, as well as
to consider creating an Induction
programme.
1 Agreed action:MASH
Guidance will be created for
partners and for induction
purposes. This will include the
entry criteria for partners to join
the MASH group. 
Agreed evidence:
Availability of MASH Guidance.
D Reilly-Davidson,
CPDT Team
Leader 
G Irons, MASH
Social Worker 
S Wilson,
Improvement
Officer
March
2026
4 6.4 To support improved shared
understanding of the MASH
process, it would be beneficial to
formally document the MASH
procedure and to define in it a
case allocation criteria.
1 Agreed action:MASH
Guidance will be created for
partners and for induction
purposes. This will include the
referral criteria for MASH and
the case allocation criteria. 
Agreed evidence: 
Availability of MASH Guidance.
D Reilly-Davidson,
CPDT Team
Leader 
G Irons, MASH
Social Worker 
S Wilson,
Improvement
Officer
March
2026
5 6.4 In order to improve decision-
making and to increase
transparency, it would be
advisable to include in the
Register the referrers, reasons for
the referrals and to add a check
column for the referrer’s
awareness of the outcomes
1 Agreed action:This will be
captured by the new system
when the process moves to
Mosaic.
Agreed evidence:
Relevant Mosaic entries. 
D Reilly-Davidson,
CPDT Team
Leader 
L Willoughby,
Mosaic System
Project Officer 
March
2026

Page 15

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
(“referrer informed of outcomes”),
as well as the check columns for
parental consent and for their
awareness of the outcomes
(“parents informed of outcomes”). 
6 6.4 To avoid misinterpretation of the
group’s role, it would be advisable
to consider changing its title from
Multi-Agency Screening Hub to
Multi-Agency Safeguarding Hub
(or to another suitable name). For
coherence and accuracy, it would
also be advisable to replace
acronym “MASHUP” with acronym
“MASH” in all relevant documents
and in all future correspondence
(“MASHUP List”, “MASHUP
Register”, “MASHUP Group” etc).
1 Agreed action:
• Any documentation,
paperwork etc will be
amended and
partners/workers will be
reminded that the
process is MASH not
MASHUP. 
• A change of name from
“Screening” to
“Safeguarding” will not
be progressed though,
as MASH is now an
established name and
because ‘Safeguarding’
would be misleading.
However, it will be
highlighted within MASH
guidance that it is not
only a screening hub,
but also an allocation
system. 
Agreed evidence:
• MASH Guidance.
D Reilly-Davidson,
CPDT Team
Leader
G Irons, MASH
Social Worker 
K Taylor, MASH
Senior Social Care
Officer
From
November
2025

Page 16

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
• Re-named MASH
documentation. 
7 6.4 To prevent inefficient resource use
and case escalations, it might be
constructive to consider using the
potential for increased admin
support (especially with the
outcomes processing) and
increasing the number of MASH
partners (to avoid their waiting
lists’ delays).
1 • Agreed action:Non-
urgent referral form
being reviewed with
planned partners to
determine if this can be
accepted as an initial
referral to avoid delays.
• Admin support is
centralised, however
consideration of
financial support re
Modern Apprentice may
be of benefit. 
Agreed evidence:
• Proves of quicker
allocation if MASH
referral is accepted.
• Appointment of a
Modern Apprentice. 
D Reilly-Davidson,
CPDT Team
Leader
S Wilson,
Improvement
Officer
March
2026

Page 17

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
10.  Authorisation 
10.1 The auditor for this assignment was K Tarnowska.  The supervising auditor was
D Arachchilage. 
This report is authorised for issue: ... 
11.  Distribution 
11.1 This report has been distributed to: 
T Glen, Chief Executive
J Pepper, Chief Officer - PK HSCP
A Singh, Strategic Lead - Children, Families and Justice/ CSWO
S Cooper, Service Manager - Children’s Services
S Wilson, Improvement Officer - Children’s Services
D Reilly-Davidson, Team Leader - Child Protection Duty Team  
L Simpson, Strategic Lead - Legal & Governance
Committee Services
External Audit.

Page 18

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
12.  Assessment Definitions 
12.1 The following table contains the definitions of the control objective assessment. 
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and
control exist, with internal controls operating effectively and
being consistently applied to support the achievement of
objectives in the area audited.
Reasonable
Assurance
There is a generally sound system of governance, risk
management and control in place. Some issues, non-
compliance or scope for improvement were identified which
may put at risk the achievement of objectives in the area
audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were
identified. Improvement is required to the system of
governance, risk management and control to effectively
manage risks to the achievement of objectives in the area
audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control is inadequate to
effectively manage risks to the achievement of objectives in
the area audited. 
12.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions. 
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations/ major concerns which require
immediate action. Management will need to add these to
the appropriate Service risk register.
Issue represents a control weakness which could cause, or
is causing, severe disruption of the process or severe
adverse effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of
key controls requiring urgent action. Management should
consider adding these to the appropriate Service/ divisional
risk register.

Page 19

Final Report 24-03 Multi-Agency Screening Hub (MASH). V4 
Issue represents a control weakness which could have, or
is having, major adverse effect on the ability to achieve
process objectives
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should
consider these when updating any divisional / team risk
registers.
Issue represents a control weakness which could have, or
is having, significant adverse effect on the ability to achieve
process objectives
2 Low Minor observations regarding the adequacy of controls
which require action to improve the efficiency,
effectiveness, or economy of operations or which otherwise
require to be brought to the attention of Senior
Management.
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process
objectives
1 Trivial / Minor Very minor observations which will be raised during the
audit and may not be included within the final report.
Issue represents a very minor control weakness with
negligible impact on the ability to achieve process
objectives. The issue will be raised during the audit and may
not be included within the final report.