Democracy Spraffa

Agenda Document Pack - Audit and Risk Committee - 02/12/2024

Perth and Kinross Council · 2 December 2024
Back to Audit and Risk Committee — 2 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
26/11/2024 
A hybrid meeting of the Audit and Risk Committee will be held in the Council
Chamber on Monday, 02 December 2024 at 13:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive      
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor David Illingworth  (Convener)
Councillor Andy Chan  (Vice-Convener)
Councillor Liz Barrett
Councillor Ken Harvey
Councillor Iain MacPherson
Councillor Colin Stewart
Councillor Grant Stewart 
Page 1 of 214

Page 2

Page 2 of 214

Page 3

Audit and Risk Committee 
Monday, 02 December 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF
CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF AUDIT AND RISK COMMITTEE OF 30
SEPTEMBER 2024 FOR APPROVAL
(copy herewith) 
5 - 8 
4 DRAFT AUDITED 2023/24 ANNUAL ACCOUNTS AND DRAFT
2022/24 ANNUAL AUDIT  REPORT
Report by Strategic Lead - Finance and Business Support (copy
herewith 24/340) 
9 - 186 
5 INTERNAL AUDIT UPDATE
Report by Chief Internal Auditor (copy herewith 24/341) 
187 - 190 
6 INTERNAL AUDIT REPORT - 24-07 CREDIT CARD USAGE
(copy herewith 24/342) 
191 - 206 
7 INTERNAL AUDIT FOLLOW UP
Report by Chief Internal Auditor (copy herewith 24/343) 
207 - 214 
IT IS RECOMMENDED THAT THE PUBLIC AND PRESS SHOULD BE EXCLUDED
DURING CONSIDERATION OF THE FOLLOWING ITEM(S) IN ORDER TO AVOID
THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN TERMS OF
SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT 1973 
INTERNAL AUDIT FOLLOW UP - APPENDIX 2 - ACTIONS WITH
A COMPLETION DATE UP TO OCTOBER 2024 WHICH HAVE
YET TO BE COMPLETED
• Exempt Reason 6 - Information relating to the financial or
business affairs of any particular person (other than the
authority).
• Exempt Reason 14 - Any action taken or to be taken in
connection with the prevention, investigation or prosecution of
crime. 
Page 3 of 214

Page 4

Page 4 of 214

Page 5

AUDIT AND RISK COMMITTEE 
Minute of Meeting of the Audit and Risk Committee held hybrid on Monday 30
September 2024 at 13.00pm. 
Present: Councillors D Illingworth, L Barrett, A Chan, K Harvey, I MacPherson,
G Stewart, and C Stewart. 
In Attendance: G Boland, Strategic Lead – Strategic Planning, People and
Performance; P Johnstone and P Smith (Strategic Planning, People and Resources),
L Harris (Customer and Digital Services), J Clark, K Molley, A Brown and M
Pasternak (Legal and Governance). 
Also in Attendance: R Browne and M Bruce (Audit Scotland) 
Councillor D Illingworth, Convener, Presiding. 
1. WELCOME AND APOLOGIES/SUBSTITUTIONS 
The Convener welcomed everyone to the meeting. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest made in terms of the Councillors’
Code of Conduct. 
3. MINUTE OF SPECIAL MEETING OF THE AUDIT AND RISK COMMITTEE
OF 24 JUNE 2024 FOR APPROVAL 
The minute of meeting of the Audit and Risk Committee of 24 June 2024 was
submitted and approved as a correct record subject to the following amendment: 
Item 10.  Annual Update Report – Strategic Risk Management 
Recommendation corrected: 
(i) The contents of the report be considered and appropriate and constructive
challenge and comment, be provided. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved: 
The contents of the Outstanding Business Statement, be noted. 
3
Page 5 of 214

Page 6

5. BEST VALUE THEMATIC REVIEW 
There was submitted a report by Strategic Lead –Strategic Planning, People
and Performance (24/269) (1) setting out the findings and six recommendations for
improvement contained in the Perth and Kinross Council’s Best Value Thematic
Review Report 2023/24, and also (2) providing a response and details actions that
will be progressed in respect of the recommendations. 
Councillor L Barrett queried the target date of September 2025 of the
recommendation to develop measures to assess the impact of its flexible working
framework on staff productivity, wellbeing, and service performance to ensure these
are being maintained or improved. P Johnstone advised that the Council did
introduce a minimum of working two days a week in a Council workplace from April
2024, but the guidance had not been fully implemented due to capacity issues
across the buildings. P Johnstone added that the target date of September 2025 had
been set to allow the policy to be embedded fully and to undertake a survey to
capture information from employees who are working hybrid.   
The Convener queried the action being undertaken to tackle the levels of
absenteeism in the Council. P Johnstone confirmed that sickness levels had
increased nationally. P Johnstone advised that a team are dedicated as part of the
People and Culture Review to look at employee relations and wellbeing. P
Johnstone added that work had also been underway with Strategic Leads to see
what other support mechanisms could be put in place to assist them to manage their
absence levels throughout the organisation. 
Councillor G Stewart queried how the Council had built and maintained
resilience in terms of technology and ways of working. L Harris confirmed that
continuous training would be vital for all employees to learn about new technology
within the organisation. L Harris added that in the event of system failure or a
problem with technology, business continuity plans are in place to continue service
delivery. Regarding digital services and access to online services for customers, L
Harris advised that the Customer Contact Centre offer help to the public with
accessibility issues. 
Resolved: 
The contents of Audit Scotland’s Best Value Thematic Review Report
(24/269), be noted. 
6. INTERNAL AUDIT FOLLOW UP 
There was submitted a report by Chief Internal Auditor (24/270) presenting a
current summary of Internal Audit’s ‘follow up’ work relating to actions due for
completion up to July 2024. 
Resolved:
The contents of the Internal Audit Follow Up, be noted. 
Page 6 of 214

Page 7

7. INTERNAL AUDIT UPDATE 
There was submitted a report by Chief Internal Auditor (24/271) presenting a
summary of Internal Audit’s work undertaken as part of the Internal Audit Plans for
2022/23 and 2023/24. 
In response to a question from the Convener regarding staffing resources
within Internal Audit, J Clark confirmed that two new employees would be joining
the team in October. J Clark advised that the Senior Auditor was due to go on
maternity leave but confirmed that the new members of staff would assist the
team in delivering the internal audit plans. 
The Convener thanked J Clark and her team for all their work. 
Resolved:
The contents of the Internal Audit Update, be noted. 
8.  NATIONAL FRAUD INITIATIVE OUTCOMES 2022/23 AND PREPARATIONS
2024/25 
There was submitted a report by Chief Internal Auditor (24/272) (1) presenting
the reported findings of the 2022/23 National Fraud Initiative (NFI) exercise, and also
(2) outlining the preparations currently underway in respect of the 2024/25 exercise. 
In response to a question from Councillor L Barrett, J Clark confirmed that the
position to not share the full electoral register for national fraud initiative had been
adopted by two local authorities in the United Kingdom including Perth and Kinross
Council. J Clark advised that advice received from our legal advisers had been that
the Council are not permitted to share. J Clark added that legal had contacted
various agencies to see if it would be a position the Council could reconsider but
unfortunately to date it had not been the case. In response to a supplementary
question from Councillor L Barrett regarding the cost to the Council for additional
checks due to not using the electoral register, J Clark advised that the cost had been
undertaken periodically in line with the NFI Timetable. 
Councillor C Stewart queried why the last question on the self-appraisal
checklist which asked, ‘do we publish, as a deterrent, internally and externally the
achievements of our fraud investigators?’ had been marked as not applicable. J
Clark advised that fraud had not been uncovered from the NFI exercise so there had
not been anything to report. 
Resolved:
(i) The outcomes as reported within the national Audit Scotland report of the
National Fraud Initiative 2022/23, be noted.
(ii) The work undertaken within the Council in preparation for the 2024/25
exercise, be noted.
(iii) The section of Audit Scotland’s self-appraisal checklist relating to those
charged with governance at Appendix A of Report 24/272, be approved.
Page 7 of 214

Page 8

9. INTERNAL AUDIT REPORT – 23-04 CHILD POVERTY 
There was a report by Chief Internal Auditor (24/273) providing update on the
progress being made with the Child Poverty Strategy. 
In response to a question from Councillor G Stewart, P Smith advised that in
terms of protected characteristics, the Scottish Government identify several priority
groups that they feel are particularly affected by poverty. P smith added there had
been a difficulty in measuring data as people are not obliged to provide information.
P Smith added that an action outlined in the report would be for further work to be
undertaken with the Equalities Officer to try capture more data to get a better
understanding of the people who are affected by poverty and how we are helping
them. 
In response to a question from Councillor C Stewart regarding the frequency
of meetings of the Child Poverty Working Group, P Smith advised that the Group had
met three times so far in 2024 and the schedule of dates for the Group had been set
for the following year. P Smith added that there also would be extra assurance from
the Poverty Theme Board which provide governance to the working group. 
In response to a follow-up question from Councillor L Barrett regarding how
many times the Anti-Poverty Task Force had met this year, P Smith confirmed that
the Task Force had met 3 times so far and another meeting had been arranged
before the end of the year. P Smith added that a steering group for the Anti-Poverty
Task Force meets monthly which would involve senior members of the Task Force. 
The Convener queried if there are any specific actions undertaken in the
areas of Perth and Kinross that have a Scottish Index of Multiple Deprivation of 1. P
Smith confirmed that as part of the Locality Working Programme, pilot work had
been undertaken in Letham and Highland Perthshire and there are plans to roll the
pilot out further across Perth and Kinross. P Smith added that a one size fits all
approach would not work to meet the needs of all areas across central and rural
Perthshire. 
Members thanked officers for their work in preparing the audit. 
Resolved: 
The contents of the Internal Audit Report – 23-04 Child Poverty (24/273), be
noted. 
~~~~~~ 
Page 8 of 214

Page 9

Perth And Kinross Council 
Audit And Risk Committee 
2 December 2024 
DRAFT AUDITED 2023/24 ANNUAL ACCOUNTS
DRAFT 2023/24 ANNUAL AUDIT REPORT 
Report by Chief Finance Officer
(Report No. 24/340) 
1. PURPOSE 
1.1 This report presents the Council’s draft Audited 2023/24 Annual Accounts in
accordance with the Local Authority Accounts (Scotland) Regulations 2014
and draft 2023/24 Annual Audit Report. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee:
• approves the Audited 2023/24 Annual Accounts – see Appendix 1. 
• authorises the Leader of the Council, the Chief Executive and the Chief
Finance Officer to sign the Audited 2023/24 Annual Accounts and the
Chief Finance Officer to sign the Letter of Representation – see
paragraph 5.7. 
• Notes the contents of Audit Scotland’s Draft 2023/24 Annual Audit
Report – see paragraph 6.3. 
3. STRUCTURE OF THE REPORT 
3.1 This report includes the following sections:
• Section 4 Background
• Section 5 Draft Audited 2023/24 Annual Accounts
• Section 6 Draft 2023/24 Annual Audit Report
• Section 7 Conclusions
4. BACKGROUND 
4.1 In line with legislative requirements, the Audit and Risk Committee considered
the Unaudited 2023/24 Annual Accounts on 24 June 2024 (Report No. 24/194
refers). 
4.2 The Unaudited 2023/24 Annual Accounts were then submitted to Audit
Scotland, the Council’s external auditors on the same day (24 June 2024). 
4
Page 9 of 214

Page 10

4.3 The Annual Accounts are prepared in accordance with the 2023/24 CIPFA
Code of Practice on Local Authority Accounting (“the Code”). 
4.4 These accounts also comply with the Local Authority Accounts (Scotland)
Regulations 2014 which revoked the Local Authority Accounts (Scotland)
Regulations 1985. 
4.5 The Unaudited 2023/24 Annual Accounts were available for public inspection
between 28 June and 18 July 2024 (inclusive).  During this period, Audit
Scotland received no objections to the Unaudited 2023/24 Annual Accounts. 
5. DRAFT AUDITED 2023/24 ANNUAL ACCOUNTS 
5.1 The audit of the 2023/24 Annual Accounts took place between July and
November 2024.  The audit considered not only the financial statements but
also areas such as financial performance and corporate governance. 
5.2 Significant findings and key audit matters are set out in detail in Exhibit 3
within the draft 2023/24 Annual Report which is included in Appendix 3. 
These findings are summarised as follows: 
• Error in accounting for depreciation of Council dwellings
• Omission of additional pension contributions for senior staff
• Classification of error within non-current assets
• Reporting of performance within the management commentary
• Errors in group accounts
• Statutory basis for reserves
• Application of financial flexibility for service concession arrangements
5.3 None of the misstatements identified above and within Exhibit 3 have an
impact on the level of resources available to the Council.   
5.4 In addition, there were a few minor presentational adjustments. 
5.5 Approval of the Accounts at today’s meeting will provide authorisation for the
Leader of the Council, the Chief Executive and the Chief Finance Officer to
sign them.  The Draft Audited 2023/24 Accounts (unsigned) are attached to
this report at Appendix 1. 
5.6 The Chief Finance Officer will also sign the Letter of Representation included
at Appendix 2.  Once signed, the Draft Audited 2023/24 Annual Accounts
and Letter of Representation will be passed to Audit Scotland so that they
may issue their opinion in the form of an audit certificate. 
5.7 ACTION: The Committee is asked to approve the Draft Audited 2023/24
Annual Accounts and authorises the Leader of the Council, the Chief
Executive and the Chief Finance Officer to sign them and also to authorise the
Chief Finance Officer to sign the Letter of Representation. 
Page 10 of 214

Page 11

5.8 All signatures will be provided electronically using a system recognised by
Audit Scotland that ensures the signings comply with the legislative
requirements. 
6. DRAFT 2023/24 ANNUAL AUDIT REPORT 
6.1 The Draft 2023/24 Annual Audit Report is set out at Appendix 3.  The Draft
2023/24 Annual Audit Report sets out Audit Scotland’s opinions and
conclusions on the overall audit and their findings to be reported under
ISA260: Report to those Charged with Governance.  The Draft 2023/24
Annual Audit Report also includes the findings in relation to Perth and Kinross
Charitable Trusts. 
6.2 The key messages from the 2023/24 audit are set out in the Audit
Conclusions on page 3 of Appendix 3 and are summarised as follows: 
2023/24 annual accounts 
1. Audit opinions on the annual accounts of the Council, its Group,
connected charities administered are unmodified.
Financial management 
2. The council’s budget setting and financial management arrangements
operated effectively during 2023/24.
3. Excluding the one-off impact of service concession flexibility, the Council
reported a £15.1 million (3.2%) deficit on General Fund services for
2023/24 which was £20.2 million less than planned. The Housing
Revenue Account balance reduced by £0.4 million during 2023/24 due
to the planned use of reserves (£0.3 million) and additional one-off
costs identified during the year (£0.1 million).
4. The Council delivered 76 percent of its capital programme in 2023/24.
External debt levels remained relatively static during the year as the
council had taken advantage of low borrowing rates in previous years
and these loans have been used to fund capital expenditure.
5.  Key financial controls operated effectively during 2023/24.
Financial sustainability 
6. The Council’s General Fund balance increased in the year due to the
application of the service concession financial flexibility accounting
arrangements. The council has used this to support its 2023/24 outturn
and plans to use the remainder to support its budgets though to 2027/28.
7. The 2024/25 budget included a planned use of reserves of £13.8
million, but subsequent amendments increased this to £28.1 million.
8. The medium-term financial plan was last presented in October 2023 and
will be reviewed following publication of the Scottish Government’s
Medium-Term Financial Strategy.  
Page 11 of 214

Page 12

The council has yet to develop its revenue financial planning beyond six
years as recommended in the 2019 Best Value Assurance Report.
9. The council’s capital investment programme totals £674 million over the
next five years and a Corporate Asset Management Framework has
been approved to inform investment decision-making. Following an
updated options appraisal, the PH2O project, which was paused last
year due to inflationary pressures, is going ahead on an alternative site.
10. The Transformation and Change Programme is progressing in line with
the planned timetable. 
Best Value 
11. Our Best Value thematic review of workforce innovation confirmed that
the Council has a workforce plan to support the delivery of its strategic
objectives but has yet to set targets against which to measure and report
on progress.
12. Two of the 2019 Best Value Assurance Report recommendations remain
outstanding and there has been limited reporting of progress to
members or the Executive Leadership Team.
Vision, leadership, governance, and use of resources 
13. The Council revised its service and senior leadership structure during
the year as part of its Transformation and Change Programme.
14. The Council has appropriate governance arrangements in place for
delivery of its plans.
15. In line with national trends, there has been an overall decline in LGBF
performance indicators over the last 5 years, although performance
relative to other councils is largely unchanged. KPI trend analysis
suggests improvement in performance compared to last year.
16. The Council is compliant with the Accounts Commission’s SPI direction
with comprehensive performance information available via ‘PK
Performs.’ 
6.3 ACTION: The Committee is asked to note the contents of Audit Scotland’s
Draft 2023/24 Annual Audit Report. 
6.4 It is anticipated that the final 2023/24 Annual Audit Report will be issued by
Audit Scotland following completion of the final accounts process. 
7. CONCLUSIONS 
7.1 Audit Scotland’s findings on the 2023/24 audit are set out in the Draft 2023/24
Annual Audit Report which is attached at Appendix 3 to this report. 
Page 12 of 214

Page 13

Author(s)
Name  Designation Contact Details
Scott Walker Chief Finance Officer  chxfinance@pkc.gov.uk 
Alison O’Brien  Corporate Accounting
Manager 
Page 13 of 214

Page 14

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.
Page 14 of 214

Page 15

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report other
than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.  
Page 15 of 214

Page 16

4. Consultation 
Internal 
4.1. The Executive Leadership Team have been consulted in the preparation of
this report.   
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix 1 – Draft Audited 2023/24 Annual Accounts 
Appendix 2 – Letter of Representation 
Appendix 3 – Draft 2023/24 Annual Audit Report 
Page 16 of 214

Page 17

Corporate &
Democratic Services   
PERTH AND KINROSS COUNCIL 
ANNUAL ACCOUNTS 
2023/24 
AUDITED  
4
Page 17 of 214

Page 18

Contents
Management Commentary ........................................................................................................................................................... 1
Annual Governance Statement .................................................................................................................................................. 16
Independent Auditor’s Report to the Members of Perth and Kinross Council and the Accounts Commission................. 21
The Financial Statements ........................................................................................................................................................... 24
Movement in Reserves Statement ........................................................................................................................................... 24
Comprehensive Income and Expenditure Statement ............................................................................................................... 25
Balance Sheet .......................................................................................................................................................................... 26
Cash Flow Statement ............................................................................................................................................................... 27
Statement of Responsibilities for the Annual Accounts ......................................................................................................... 28
Notes to the Financial Statements ............................................................................................................................................ 29
1. Accounting Policies .............................................................................................................................................................. 29
2. Accounting Standards that have been issued but have not been adopted ........................................................................... 39
3. Critical Judgements in Applying Accounting Policies ........................................................................................................... 40
4. Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty .................................................. 40
5. Adjustments between Accounting Basis and Funding Basis under Regulations .................................................................. 42
6. Expenditure and Funding Analysis ....................................................................................................................................... 43
7. Transfer (to)/from Earmarked Reserves ............................................................................................................................... 46
8. Other Operating Expenditure / Income ................................................................................................................................. 47
9. Financing and Investment Income and Expenditure ............................................................................................................. 47
10. Taxation and Non Specific Grant Income ........................................................................................................................... 48
11. Material Items of Income and Expense .............................................................................................................................. 48
12. Premiums and Discounts on Debt Rescheduling Written Down ......................................................................................... 48
13. General Grants, Bequests and Donations .......................................................................................................................... 49
14. Expenditure and Income Analysed by Nature .................................................................................................................... 49
15. Agency Services ................................................................................................................................................................. 50
16. External Audit Costs ........................................................................................................................................................... 50
17. Termination Benefits........................................................................................................................................................... 50
18. Post-Employment Benefits ................................................................................................................................................. 51
19. Related Parties ................................................................................................................................................................... 56
20. Leases ................................................................................................................................................................................ 58
21. Property, Plant and Equipment ........................................................................................................................................... 59
22. Heritage Assets .................................................................................................................................................................. 64
23. Investment Properties......................................................................................................................................................... 65
24. Intangible Assets ................................................................................................................................................................ 66
25. Assets Held for Sale ........................................................................................................................................................... 66
26. Long Term Debtors............................................................................................................................................................. 66
27. Inventories .......................................................................................................................................................................... 67
28. Debtors ............................................................................................................................................................................... 67
29. Creditors ............................................................................................................................................................................. 67
30. Provisions Other than Bad and Doubtful Debts .................................................................................................................. 68
31. Usable Reserves ................................................................................................................................................................ 68
32. Unusable Reserves ............................................................................................................................................................ 68
33. Impairment Losses ............................................................................................................................................................. 71
34. Grants ................................................................................................................................................................................. 71
35. Capital Expenditure and Capital Financing ......................................................................................................................... 72
36. Public Finance Initiatives and Similar Contracts ................................................................................................................. 72
37. Authorisation of Annual Accounts ....................................................................................................................................... 74
38. Contingent Liabilities .......................................................................................................................................................... 74
39. Financial Instruments ......................................................................................................................................................... 75
Page 18 of 214

Page 19

40. Devolved School Management (DSM) Schools .................................................................................................................. 80
41. Operating Activities............................................................................................................................................................. 80
42. Investing Activities .............................................................................................................................................................. 80
43. Financing Activities ............................................................................................................................................................. 81
44. Cash and Cash Equivalents ............................................................................................................................................... 81
45. Trust Funds ........................................................................................................................................................................ 81
46. The Statutory Loans Fund .................................................................................................................................................. 82
Housing Revenue Account Income and Expenditure Statement ............................................................................................ 84
Statement of Movements on the Housing Revenue Account Balance ..................................................................................... 85
The Accompanying Notes to the Housing Revenue Account Income and Expenditure Statement .......................................... 86
Council Tax Income Account ..................................................................................................................................................... 87
The Accompanying Notes to the Council Tax Income Account ................................................................................................ 88
Non-Domestic Rate Income Account ........................................................................................................................................ 89
The Accompanying Notes to the Non-Domestic Rate Income Account .................................................................................... 90
Charitable Trusts ........................................................................................................................................................................ 91
Common Good ............................................................................................................................................................................ 92
The Accompanying Notes to the Common Good Accounts...................................................................................................... 93
Group Accounts .......................................................................................................................................................................... 94
Group Movement in Reserves Statement................................................................................................................................. 94
Group Comprehensive Income and Expenditure Statement .................................................................................................... 95
Group Balance Sheet ............................................................................................................................................................... 96
Group Cash Flow Statement .................................................................................................................................................... 97
Reconciliation of the Single Entity Deficit for the Year to the Group Deficit .............................................................................. 98
Notes to the Group Accounts .................................................................................................................................................... 99
1. Combining Entities ............................................................................................................................................................... 99
2. Nature of Combination........................................................................................................................................................ 100
3. Financial Impact of Consolidation and Going Concern ....................................................................................................... 100
4. Group Comprehensive Income and Expenditure Statement – Financing and Investment Income and Expenditure .......... 100
5. Group Balance Sheet – Investments .................................................................................................................................. 100
6. Group Balance Sheet – Short Term Debtors (net of provisions) ........................................................................................ 100
7. Group Balance Sheet – Short Term Creditors .................................................................................................................... 101
8. Group Balance Sheet – Pension Liability ........................................................................................................................... 101
9. Group Cash Flow Statement .............................................................................................................................................. 101
10. Group Cash Flow – Investment Activities ......................................................................................................................... 101
11. Group Cash Flow – Financing Activities ........................................................................................................................... 101
Remuneration Report ............................................................................................................................................................... 102
Glossary .................................................................................................................................................................................... 111 
Page 19 of 214

Page 20

1 | Perth and Kinross Council Annual Accounts 2023/24 
Management Commentary
1. Introduction
These Annual Accounts contain the financial statements of Perth and Kinross Council and its group for the year ended 31 March
2024.
This management commentary outlines the key messages in relation to financial planning and performance for financial year
2023/24 and how this has supported delivery of the Council’s strategic objectives.  This commentary also looks forward,
outlining the future financial plans for the organisation and the challenges and risks which it will face as it strives to meet the
needs of the people of Perth and Kinross.
A glossary of terms is set out from page 111.
2. Who are we, our vision and priorities
The Council is situated in a central location in Scotland.  It covers a geographical area of around 5,286 km² and has an
estimated population of 151,120 (2022 mid-year estimate).  Between 2011 and 2021, the population of Perth and Kinross
increased by 4.7% (Scotland 3.4%).  This is the 8th highest percentage change out of the 32 council areas in Scotland.  The
latest population projections over the next 10 years estimate a 0.6% reduction in the population on Perth and Kinross compared
to 1.1% increase across Scotland. 
Like all councils, the pandemic and inflationary pressures facing households in recent years has only added to the increasingly
complex challenges we face, against a backdrop of the most testing financial circumstances local government has ever
experienced.  This means that it will be impossible to continue doing the same things we have done in the past and we are
rethinking how we work with, and within, our communities and with all of our partners to achieve the best outcomes for the
people of Perth and Kinross.
The Corporate Plan 2022 – 28, that was approved in December 2022, sets out a vision for “a Perth and Kinross where everyone
can live life well, free from poverty and inequality”.  It sets out the Council’s corporate outcomes which are aligned with its
organisational values and designed to address or mitigate the impact of the many challenges the Council and its communities
are facing both now and in the future.  We have committed to working in partnership and better engaging with people and
communities to ensure that they are involved and can have their say on where the Council must focus time and resources.
The strategic outcomes are underpinned by seven key priorities, aimed to address or mitigate the challenges, focus our work
where it is needed most, and support the delivery of our vision: 
• Tackling poverty 
• Tackling climate change and supporting sustainable places 
• Developing a resilient, stronger and greener local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people 
• Supporting and promoting physical and mental wellbeing 
• Working in partnership with our communities – which is woven through all of the key priorities above.
The priorities incorporate the careful consideration of the feedback received from our communities, elected members, partners
and staff about what is important for Perth and Kinross.  They are also evidence-based and reflect the areas of greatest need
and those that we can most directly influence in our work. 
Importantly, the Corporate Plan sets the strategic direction for the Council and will act as a guide when making difficult decisions
around where to invest funding and resources to support their achievement and ensure we have the greatest impact. 
The Plan is not designed to stand alone but is supported and strengthened by a wider strategic framework which overarches
several areas of work all designed to contribute to our vision and outcomes.  It connects the vision of the Council and its
partners to the detailed plans that guide the delivery of our services. 
This framework ensures that all Council plans and strategies are driven by, and focused towards, the delivery of a single shared
vision for the area and our services, connecting everything we do.  
1 | Perth and Kinross Council Annual Accounts 2023/24 Page 20 of 214

Page 21

2 | Perth and Kinross Council Annual Accounts 2023/24 
The main components of our Corporate Plan’s wider strategic framework are as follows: 
• The Local Outcome Improvement Plan which details new priorities with a focus on poverty in several key areas,
setting out the actions that the Community Planning Partnership will take in the coming years to focus on inequalities
which are stubborn and require continued collaborative approaches.
• The Transformation and Change Strategy is a five-year strategy which sets out our extensive transformation
programme acting as enabler to deliver on our corporate priorities.  Delivery of the Transformation and Change
programme will be underpinned by our “one council”, no wrong door approach including our organisational-wide
cultural and behavioural change programme.  This also sets out our clear commitment to fully embed our values of
Ambition, Compassion, and Integrity and work in partnership with communities to improve outcomes for all.
• The Financial Strategy which details the financial challenges we face, the extent of the structural deficit and
measures we must take now and over the next five years to identify savings, reduce our budgets and support the
Council to become financially sustainable.
• The Corporate Workforce Plan has been reviewed to build on our existing focus on workplace culture, recruitment
and staff retention.  This new People and Culture Strategy will support the organisation through transformation and
change so that we are enabled to deliver the best public services focussed on need and within available resources.
The Corporate Plan demonstrates our commitment to improving services, enhancing the quality of life for people in Perth and
Kinross and making best use of our resources and funding.  We will continue to deliver effective and efficient services, delivering
best value by working collaboratively with our partners.
To achieve our vision, we have outlined clear outcomes, priorities, actions, and measurements of performance which will ensure
we are held accountable, can report consistently, and remain focussed on the areas that matter to people in our communities. 
While this is a five-year plan, we know that there will be things outwith our control that will change.  We will regularly review and
monitor our performance against each of the key priorities to ensure that they are still relevant and effectively contribute to our
vision.
3. The Annual Accounts 2023/24
The Annual Accounts report the financial performance of the Council.  Their main purpose is to demonstrate the stewardship of
public funds which have been entrusted to it for the delivery of the Council’s vision and strategic objectives.  The requirements
governing the format and content of the Council’s Annual Accounts are contained in the Code of Practice on Local Authority
Accounting in the United Kingdom 2023/24 (the 2023 Code).  The 2023/24 Annual Accounts have been prepared in accordance
with this Code.
4. The Financial Plan
In response to the COVID-19 pandemic  and  the  financial  challenges  being  faced  by  Local Government, in 2022, the 
Scottish Government introduced a range of financial flexibilities, one of which centred around the profiling of debt repayments
charged to the General Fund for Public Private Partnership (PPP) contracts Finance Circular 10-2022: Finance Leases and
Service Concession Arrangements.
The revised accounting guidance allows the Council to account for the cost of the repayment element over the life of the assets
rather than the life of the contract.  What this means for the Council is that the cost can be accounted for over 50 years as
opposed to the contract period of 25 or 30 years.  This approach is deemed to be prudent as it matches the expenditure profile
to the consumption of the assets over time, and by doing so, reduces the cost per annum as the debt is accounted for over a
longer period of time.  The total amount paid remains the same over the new repayment life.
This is an accounting entry which has the effect of releasing a cumulative benefit which reflects the reduced charges to the
accounts for the earlier years of the arrangements.  The cumulative benefit to 31 March 2023 is in the region of £31 million, and
there are also annual recurring benefits of approximately £3 million for 19 years and then the statutory charges will continue
until the end of the reprofiled debt repayment period (see note 36)The application of the accounting guidance was approved by
Council on 8 February 2023 (Report No. 23/43), and the accounting entries are actioned from financial year 2023/24. 
This has resulted in a significant favourable variance in this financial year, allowing the benefit to be used to support the
Revenue Budget, as agreed by Council when setting the 2023/24 Revenue Budget and provisional 2024/25 and 2025/26
Revenue Budgets on 1 March 2023 (Report No. 23/72). 
To support the delivery of the strategic objectives during 2023/24, Perth and Kinross Council approved a balanced gross
revenue budget of £552.134 million for the General Fund (March 2023).  In addition, the Housing and Social Wellbeing
Committee approved a gross revenue budget of £33.755 million for the Housing Revenue Account (January 2023).  
As part of its consistent approach to longer term financial planning, the Council has in place a Medium Term Financial Plan
through to 2029/30 that was approved by Council in October 2023, and a final Revenue Budget for 2024/25 and provisional
Revenue Budgets for 2025/26 and 2026/27 approved in February 2024.  The HRA Budget was also updated in January 2024. 
The Financial Strategy approved in June 2022 remains in place.
Councils need to account for their spending and income in a way which complies with the legislative requirements.  Most day to
day spending and income is recorded within the General Fund and the costs and income in relation to the management of our
housing stock are recorded within the Housing Revenue Account.
2 | Perth and Kinross Council Annual Accounts 2023/24 Page 21 of 214

Page 22

3 | Perth and Kinross Council Annual Accounts 2023/24 
Key to the delivery of Council functions is investment in the assets which are used to deliver these services (including schools,
houses, and transport infrastructure) and the utilisation of capital funding to stimulate development and regeneration in local
areas.  At the start of 2023/24 the Council budgeted for gross capital investment of £158.1 million on General Fund activities
and £19.2 million in respect of the Housing Revenue Account.  This expenditure is funded from borrowing, government grants,
other external contributions, capital receipts, revenue contributions and earmarked reserves.  The Council approved a new six-
year delivery programme for 2024/25 to 2029/30 at its meeting on 28 February 2024.
5. Performance Management
Our new Corporate Plan for 2022-28 sets out our strategic outcomes, which are aligned with our organisational values, and
underpinned by seven key priorities.  It contains clear outcomes, priorities, and actions and well-defined measurements of
performance which we can be held accountable for and consistently report progress against. 
Performance against priorities and actions within the Corporate Plan were detailed within the Corporate Annual Performance
Report.The Council also considered and approved the new Corporate Delivery Improvement Plan on 15 May 2024 detailing
actions and improvements for 2024/25.
Previously, performance and improvement was routinely managed and reported within individual teams, Service Management
Teams, the Extended Executive Leadership Team, and the Executive Leadership Team as well as to elected members and the
wider public. 
Over the next year, we will be introducing revised arrangements following the implementation of phase 1 of the Leadership
Review and the transformation and change programme projects, as well as the continued roll out of the Strategic Planning and
Performance and Risk system, PK Performs.  This will demonstrate our commitment to continuous improvement by
strengthening alignment between Corporate Plan performance, improvement and risk activity, budget and resource allocation
and the involvement of communities in decision making and influencing Council priorities.  
The Council has a statutory duty to publish performance information for comparison and benchmarking purposes to its citizens
and communities.  In meeting this duty, we actively participate in the Local Government Benchmarking Framework (LGBF),
providing an Elected Member briefing in March 2024 and linking to the LGBF from the performance website.  Just over half of
the performance indicators listed in the new Corporate Plan, which will be reported through our Annual Performance Report,
have data collected nationally and therefore provide a mechanism for benchmarking.
2023/24 Performance Summary
The Corporate Annual Performance Report was considered by Scrutiny and Performance Committee on 18 September 2024
and then by Council on 30 October 2024.  This report provides comprehensive information on the Council’s performance for
2023/24.  The full range of performance information for 2023/24 is available online at PK Performs.  This includes the Council’s
Annual Performance Report, Best Value Themes Updates, case studies and links to further relevant information, such as the
Local Government Benchmarking Framework.
In terms of the Annual Performance Report this includes information on the Key Performance Indicators.  The KPI performance
against 2023/24 target includes 15 areas where the target has been met or exceeded and 15 areas where the target has not
been met.  Further information is available at PK Performs. 
For 2023/24 a selection of performance outcomes are set out in the following table:
Tackling Poverty
• The Anti-Poverty Task force is developing a tackling poverty strategy to shift the focus from reactive to preventative
work.
• We have developed a programme of six interconnected projects that together have attracted over £1 million of
funding from Scottish Government and external funders.  
• These are being taken forward in partnership with Citizens Advice Bureau, and various Council teams and comprise
of: social needs screening, support and connect, building resilient families and communities, Cash First Partnership,
Money Talk plus and the Universal Whole Family Wellbeing service.
• We generated £8.5 million in additional income for Perth and Kinross residents through the benefits system; this is a
31% increase on last financial year when we generated £6.5m in benefit gains.  We received 8,022 referrals, an
increase of 7% compared to the previous year.  Clients are surveyed on an ongoing basis, 95% people surveyed had
no problems accessing the service and 96% felt the service was delivered in a way that suited their needs.  Further
details can be accessed via the Welfare Rights Annual Report 2023/24 www.pkc.gov.uk/wrannualreport.
• We supported 566 tenants with assistance from our Tenancy Sustainment Fund (TSF) to either clear arrears
balances or match their arrears payments to reduce financial hardship and sustain their tenancy. 
• Futures For Families is joint funded by Perth and Kinross Council and the Scottish Government in the effort to tackle
child poverty.  Due to delays in the Scottish Government awarding funds, the project only achieved full scale delivery
from quarter 3 in 2023/24.  Despite the late implementation the following outcomes were achieved: 
o 181 families were supported, 53 of these families have been issued/approved for digital devices in 2023/24. 
3 | Perth and Kinross Council Annual Accounts 2023/24 Page 22 of 214

Page 23

4 | Perth and Kinross Council Annual Accounts 2023/24 
o We provided £178,000 of Elev8 Training Grants to support clients into new/better employment. 
o We issued £11,000 worth of payments to private childcare providers on behalf of clients entering employment to
support the transition period into work.
o Issued 48 payments for client travel to training and 36 clothing vouchers to clients for essential workwear and
interview attire. 
• To support employers and promote the Real Living Wage our Rural Employment Incentive helped to create 25 new
rural jobs for rural young people in 2023/24.  These roles create vital new positions in smaller communities and
enhance the chances of sustained jobs remaining after the funding period.  A re-design and securing of further
funding led to an enhanced offer to businesses in 2024/25 with up to 70 newly created jobs for clients with
employment barriers.
Tackling climate change and supporting sustainable places
• The Broxden – Low Carbon Transport Hub project opened and provides sustainable Electric Vehicle charging hubs
that will reduce carbon emissions and energy costs for the council. 
• Perth and Kinross Local Heat and Energy Efficiency Strategy 2024-2045 and Delivery Plan and Perth and Kinross
Local Area Energy Plan were developed and approved.  Both provide the direction of travel towards Net Zero by
2045.
• We secured £150,000 of Innovate UK Pathfinder Places funding.  The Pathfinder project focus is on reducing non-
technical barriers for rural and deprived communities to engage in climate change action particularly energy efficiency
and transport.
• At the Climate Change and Sustainability Committee (February 2024) Elected Members agreed to trial the use of
Hydrotreated Vegetable Oil (HVO) in 6 of our refuse collection vehicles (RCVs) aimed at reducing the amount of Co2
emitted by up to 90%.  The trial started on 6 May 2024 and was concluded in August, it is anticipated that the entire
RCV fleet will be switched to using HVO permanently.  The aim is to save approximately 700 tonnes of Co2 for the
Council each financial year. 
• Following the securing of £2.72 million of capital investment from the Recycling Improvement Fund the new Scottish
Charter for Household Recycling compliant ‘4th’ (grey) bin service was rolled out in 2023/24.  73,000 households
now have a more equitable service and can dispose of additional waste streams at the kerbside.  For the first five
months of the roll out, the contamination rate for both bins (grey and blue) was 13.1% compared to 18.7% in the
previous year.  The ‘twin stream’ roll out secured an Association Public Service Excellence Bronze award in the
Waste and Recycling category.
• One of the key challenges during 2023/24 was the severe weather which struck Perth and Kinross in October 2023. 
A full review of the Perth Flood Scheme Gate Closure Procedure was carried out in partnership with the Scottish
Environmental Protection Agency including feedback from residents.  Findings and improvement actions were
reported to the Scrutiny and Performance Committee in November 2023 and January 2024, with a further update on
progress in April this year. 
• We continue to progress the development of flood schemes (at Comrie, South Kinross, and Milnathort) to improve the
resilience of flood sensitive communities.  At the Climate Change Sustainability Committee (November 2023) Elected
Members agreed on the design for a £15.3 million flood scheme for Kinross.  The project aims to protect
approximately 194 homes and businesses in the area.  
• We planted 2,512 trees on Council owned or managed open spaces and supported 118 volunteer groups to
undertake over 40,000 hours actively managing, developing and maintaining community greenspaces.
Developing a resilient, stronger and greener local economy
• We supported Binn Group to create a £100 million Energy from Waste (EfW) Plant at Binn Eco-Park joining forces
with Paprec, the French-based leader in recycling and green energies. 60% of the civil works are being managed by
locally based companies or branches and along with the 200 jobs created for its construction phase, the new EfW will
also generate 30 long-term skilled posts once the facility is operational in early 2026.
• We have attracted £100,000 from the Scottish Government to develop heat networks at scale and explore options for
the development of a Strategic Energy Partnership.  The Heat Networks (Scotland) Act 2021 places a duty on local
authorities to carry out a review of potential areas for heat networks as part of their Local Heat and Energy Efficiency
Strategy.
• 231 business start-ups were supported by Business Gateway; this is a reduction compared to 2022/23 figure of 250
but remains at the same level of other Tayside local authorities.  Additionally, we provide funding to Growbiz to
support start-up micro enterprises/self-employed individuals and social enterprises in rural Perth and Kinross. 
Support is also provided for enterprising culture in young people and in rural communities. 
4 | Perth and Kinross Council Annual Accounts 2023/24 Page 23 of 214

Page 24

5 | Perth and Kinross Council Annual Accounts 2023/24 
• Phase 2 of the Cross Tay Link Road (Destiny Bridge) project is continuing to progress well and is on programme for
completion in Spring 2025.  A key part of the project has been the delivery of a number of benefits relating to local
spend and employment during construction.  Design work has started on Phase 3 (Bertha Park Link) with completion
of specimen design in October 2024.
• We invested £80,000 in improvements at Broxden Park + Ride site for the increasing intercity network which includes
electric bus services.  This included bus/coach and passenger accessibility improvements along with provision of two
additional bus/coach bays.
• Perth Museum opened its doors on 30 March 2024, the £27 million redevelopment project included £10 million
funding through the Tay Cities Region deal.  The museum is managed in a partnership between Perth and Kinross
Council and Culture Perth and Kinross and created just under 30 new jobs.  Since opening, the museum has already
welcomed more than 50,000 visitors and was recently awarded five stars by Visit Scotland. 
• 40 clients were supported through our Skills Passport project (funded by the UK Shared Prosperity Fund), 32
unemployed individuals were supported and received funding for training, and 8 individuals were supported into self-
employment.  9 people are now in employment; however, several applicants are still in the training phase who will
hopefully gain employment thereafter.  
Enabling our children and young people to achieve their full potential
• Educational attainment across all sectors is strong with a steady upward trend in attainment of Curriculum for
Excellence levels across P1-S3, with increases of between 5% and 7% in Literacy and Numeracy in the last 5 years. 
Senior phase attainment is also showing positive trends, with increases of 4% to 5% in school leavers attaining at
Scottish Credit and Qualifications Framework Levels 5 and 6, and also increases in the proportion of young people
participating in education, employment or training over the last 5 years (COVID years excepted). 
• Inspection results for services across the day care, early learning childcare and primary sectors remain strong,
consistently above national results and comparator authorities.  Inspection outcomes in secondary schools have not
met the local expectations of good or better.  The focus for improvement in this sector is around Leadership of
Change and improving Learning and Teaching.  Effective use of Scottish Attainment Challenge funding, including the
Pupil Equity Fund, is helping to close the poverty-related attainment gap with notable progress being made in
reducing the gap in senior phase attainment.  Secondary attendance remains challenging and an area of particular
focus. 
• Outcomes for our care-experienced children and young people are improving with increased levels of attainment in
literacy and numeracy as well as a significant increase in the percentage of young people entering a positive
destination on leaving school.  However, outcomes for care-experienced young people remain lower than their peers. 
• Our Corporate Parenting Plan supports Looked After Children to achieve their full potential.  The Plan notes progress
in all areas in respect to health, wellbeing and education.  It is monitored by the Corporate Parenting sub- group that
reports to the Children, Young People and Families Partnership.  We recognise the importance of keeping children in
family placements and work hard to support children in residential placements to return to their communities when it is
safe to do so.
Protecting and caring for our most vulnerable people
• The number of referrals to the Child Protection Duty Team have been increasing each year, however all referrals that
are received are triaged immediately or within 24 hours.  Situations flagged as being a significant child protection
concern receive an immediate response to safeguarding the child or young person’s wellbeing.
• The Council’s Lets and Ukraine Landlord Offer project was the winner in the ‘Excellence in the Private Rented Sector’
category at the Chartered Institute of Housing Scotland Awards (October 2023).  The award recognised the work by
the Housing service for their work in resettling people fleeing the war in Ukraine.
• We have seen a further increase in homelessness presentations of around 15% in 2023/24 as the gap between
housing supply and demand continues to grow.  This has required an adjustment to our approach to allocations with
56% of vacancies being allocated to homeless applicants in 2023/24 compared to 45% in 2022/23.
• The replacement of 20 chalets on Double Dykes Gypsy Traveller site progressed with the appointment of a contractor
to carry out the work.  £4 million of funding secured by the Council will be used to replace all of the chalets with
brand new energy-efficient accommodation.  The project is being carried out with full consultation and engagement
with all residents to discuss individual requirements for the chalets. 
• A number of tests of change commenced/continued during 2023/24 including Complex Need Co-ordination (making
support available to people following arrest, on remand); and Co-ordination of the voluntary throughcare offer for
people being released from short-term prison sentences (including improving GP registration process and access to
sustainable housing on release).
5 | Perth and Kinross Council Annual Accounts 2023/24 Page 24 of 214

Page 25

6 | Perth and Kinross Council Annual Accounts 2023/24 
• The Perth and Kinross Community Justice and Safety Partnership launched a new Community Justice Outcome
Improvement Plan in June 2023 and provides the Partnership with a direction of travel in line with The Vision for
Justice 2022 and National Strategy for Community Justice.
Supporting and promoting physical and mental wellbeing
• In 2023/24 over £1.1 million was spent on projects to improve the infrastructure for walking and cycling in Perth and
Kinross.  The projects provided improvements and new infrastructure including shared-use footpaths, cycle parking
provision and shared use links to assist and encourage pedestrians and cyclists in local communities to use more
active forms of travel.
• In the latest Sustrans Walking and Cycling Index (March 2024), for Perth it noted that everyday walking, cycling and
wheeling takes up to 13,000 cars off the road, making an annual saving of 2,100 tonnes of greenhouse gas emissions
in the city.  The number of journeys cycled has grown since 2021.  As well as positive detail within the Index, it also
highlighted areas for improvement that we are looking to address such as increasing numbers of School Exclusion
Zones.
• A new outdoor early learning childcare project opened its gates in Perth to local nursery children.  The Westbank
Outdoor project supports children from nursery settings to access nature without barriers and allow for outdoor play
experiences that are known to have a direct and positive impact on children’s mental and physical health.
• We improved 10 parks and play areas in Auchterarder, Blair Atholl, Perth, Crieff, Dunning, Milnathort and Stanley to
encourage healthy outdoor physical activity for all abilities.
• We established a Cycle Hub at Balhousie School from where it runs many cycle training events for a wide variety of
users – including adults and children’s bike loan, e-bike testers and loans, all-accessibility bikes, e-cargo bike loans,
women only led rides etc.
Working in partnership with communities
• Pilot locality working projects are well underway in Highland Perthshire, Letham and Coupar Angus, with further
rollout to Perth City and Crieff planned.  In Highland Perthshire the multi-disciplinary team has been developed and a
steering group formed, community engagement is taking place all supported by the Improvement Service.
• The new Letham Hub is central to the work in Letham where a multi-disciplinary operating model is being developed
between Council services and partners.  In Coupar Angus work continues to address the issues raised in the
community action plan commissioned by the Community Planning Partnership.
• 104 groups received Community Investment Funding to deliver projects towards local priorities in their communities;
this was an increase of 24 compared to the previous year.  The increase was due to a greater awareness of the fund
amongst community groups and increased engagement with groups interested in applying.  
• 258 groups were supported to improve their capacity to work within their local communities to deliver a variety of
projects and interventions.  For example, we supported small community groups within Strathearn and Strathallan to
expand their offer to a wider area and create new provision for community members to access; recent examples
include the Safeart Group and the Neurodiversity Group both originally started in Crieff and are now starting to offer
groups in Auchterarder.
• The recently adopted Local Housing Strategy 2022-27 (March 2023) target is to deliver 1,050 affordable homes with
an Urban (53%) / Rural (47%) split to ensure representative distribution.  In financial year 2023/24, there were 173
new affordable homes completed by the Council and our Registered Social Landlord partnerships with an
urban/rural split of 62 new urban affordable homes (36%) and 111 new rural affordable homes (64%).
• We completed a number of flood studies in local communities (including Craigie Burn, South Kinross, Dunkeld and
Perth) to understand the risk of flooding, engage the community to disseminate the study findings, and raise
awareness of other actions such as community flood resilience. 
• We formed a Public Social Partnership with Glenfarg Community Transport Group (GCTG).  As from 3 April 2023
GCTG have been delivering a local bus service and school transport contract with funding and support from the
Council.  
For information about the Health and Social Care Partnership, please see the Perth and Kinross Integration Joint Board Annual
Accounts 2023/24 which are available at Perth and Kinross Integration Joint Board. 
6. Financial Performance
Financial performance is part of the Council’s performance management culture with regular reporting during 2023/24 to elected
members at the Finance and Resources Committee as well as regular briefings.  This section summarises the main elements
for 2023/24.
The Expenditure and Funding Analysis brings local authority performance reporting based on expenditure measured under
proper accounting practices together with statutorily defined charges to the General Fund and Housing Revenue Account.  Both
the Comprehensive Income and Expenditure Statement and the Expenditure and Funding Analysis include a segmental
6 | Perth and Kinross Council Annual Accounts 2023/24 Page 25 of 214

Page 26

7 | Perth and Kinross Council Annual Accounts 2023/24 
analysis which requires Councils to report performance based on how they are structured and how they operate, monitor and
manage financial performance.
The 2023 Code requires that Councils present the segmental analysis based on the organisational structure under which they
operate.  Additionally, the Code requires that if a local authority changes the presentation or classification of items in its financial
statements, the authority shall reclassify comparative amounts unless reclassification is impracticable.  There are no prior year
adjustments to report. 
Although the Expenditure and Funding Analysis reflects the main variances, for operational reporting the Council’s
Comprehensive Income and Expenditure reflects proper accounting practice.  The Comprehensive Income and Expenditure
Statement movements are not directly comparable with the movements in the Expenditure and Funding analysis. 
a) General Fund Revenue Expenditure for 2023/24
In 2023/24 the Council incurred actual net expenditure on Services of £491.476 million (which is the Cost of Services disclosed
in the Comprehensive Income and Expenditure Statement on page 25).  When Taxation and Non-Specific Grant Income,
Financing and Investment Income and Expenditure and Other Operating Income and Expenditure are included there was a net
Deficit on the Provision of Services of £51.293 million.
The Expenditure and Funding Analysis information on pages 43 and 44 sets out adjustments between the net Deficit on the
Provision of Services of £51.293 million, included in the Comprehensive Income and Expenditure Statement, and the net
expenditure charged to the General Fund and HRA in the table below of £15.492million.  The adjustments of £35.801 million
represent the difference between the net expenditure of the Council that is chargeable to taxation and rents and the figures
reported in the Comprehensive Income and Expenditure Account.  The deficit in the Expenditure and Funding Analysis is set out
in the way in which the Council organises itself and manages and reports on financial performance.
The following table sets out adjustments to the most recently approved Revenue Budget to ensure that budget and actual
figures are comparable.  These include the Public Finance Initiative, external income and capital accounting adjustments.  On a
comparable basis the table shows a net variance (under spend/additional income) of £19.079 million which is explained in
further detail. 
Updated
Budget Per
Revenue
Monitoring
Report No.4 Virements
Capital
Accounting
Adjustments
Revised
Budget
Net 
Expend.
Charged to
the General
Fund and
HRA
Balances
per Expend.
and
Funding
Analysis Variance 
£ '000 £ '000 £ '000 £ '000 £ '000 £ '000
COUNCIL SERVICES      
Education and Children's Services 240,539 (16,807) (14,851) 208,881 200,653 (8,228)
Health and Social Care 87,975 124 0 88,099 87,613 (486)
Communities 81,323 143 (4,093) 77,373 66,825 (10,548)
Chief Executive’s Service 4,810 (67) 0 4,743 4,569 (174)
Corporate and Democratic Services 40,978 (1,952) (2,232) 36,794 36,229 (565)
Housing Revenue Account 0 (6,985) 0 (6,985) (6,985) 0
Valuation Joint Board 1,309 0                   0 1,309 1,436 127
Non Distributed Costs 1,655 0                   0 1,655 1,757 102
NET COST OF SERVICES 458,589 (25,544) (21,176) 411,869 392,097 (19,772)       
Taxation and Non-Specific Grant (431,567) 19,217  (412,350) (411,619) 731
Finance / Investment / Other 7,270 7,316 21,176 35,762      35,014 (748)             
Use of (Increase) of General Fund per CIES 34,292 989 0 35,281 15,492 (19,789)       
Contributions to/(from) other Reserves 5,365 (989) 0 4,376 5,086 710       
Use of (Increase) of General Fund Balances 39,657 0 0 39,657 20,578 (19,079) 
The actual contribution from the General Fund was £20.578 million.  This is £19.079 million less than planned and is made up
of additional income and service under spends and is comparable with the revenue monitoring positions that have been
presented regularly to the Finance and Resources Committee throughout the financial year.  The following section provides a
summary of the significant variances. 
7 | Perth and Kinross Council Annual Accounts 2023/24 Page 26 of 214

Page 27

8 | Perth and Kinross Council Annual Accounts 2023/24 
Education and Children’s Services delivered net under spends / additional income of £8.2 million.  The main reasons for this
are:-
• In respect of the Devolved School Management (DSM) Scheme there was a net under spend / additional income
(£501,000) reflecting savings on staff costs and additional income which was partially offset by additional expenditure on
supplies and services (educational materials) and property costs.  These resources will be carried forward by schools into
2024/25.
• In terms of non-DSM budgets there were further budget variances / additional income as follows:
o Across non-devolved Education Services there was a net under spend / additional income of £3.1 million which
was generated within the following sectors.
• Across the Nursery sector there was a net under spend of £1.6 million due in the main to staff slippage in
excess of budgeted levels.  
• In the Primary sector, there was a net over spend of £300,000 due, in the main, to staff slippage in targets not
being achieved.
• Within the Secondary sector there was a net under spend of £600,000 due to savings within staff costs and other
operational budgets.
• Across the Special sector there was a net under spend / additional income of £1.2 million.  Staff slippage in
excess of budgeted levels, third party payments and additional income were the main factors contributing to the
final outturn.
o Within Services for Children, Young People and Families there was a net under spend of £400,000.  The main
reasons for this was staff slippage in excess of budget and additional grant income.
o Across the Grants sector, the Council received £2.1 million which will be carried forward in earmarked Reserves to
support activity in future years.
o In Catering Services there was a net under spend / increased income of £1.6 million due to reduced costs and
higher uptake of school meals.
o Across the remainder of the Service there were net under spends / additional income of £500,000. 
Communities delivered a net under spend / additional income of £10.5 million, which is made up of variances across the
Service as follows:
• The main reason for this variance was the receipt of grant funding during 2023/24 across the Service.  The terms of
individual grants mean that £8 million of funding was received to take forward initiatives in future financial years.  This
income will be carried forward in earmarked Reserves.
• Across the Service, the budgeted staff slippage target was exceeded by £1.4 million.
• In relation to income, the Service generated £1 million more than budgeted targets.  This included planning and building
warrant fees, commercial rent and income from the sale of recyclates.
• Across the remainder of the Service there was a net under spend of £100,000.  This net position included the Council’s
contribution towards the costs of severe weather throughout 2023/24 and the receipt of funding from the Scottish
Government in relation to the Bellwin Scheme.
General Fund and Housing Revenue Account Balances increased by £13.683 million to £86.053 million in line with the budget
adjustments approved throughout the year by Council and the Finance and Resources Committee as well as recognising the
implications of final outturns and the implementation of the Service Concession Scheme.  When the Housing Revenue Account
Balance of £2.260 million and the earmarked Reserves of £65.083 million that are set out on page 46 are excluded this leaves
an uncommitted General Fund Balance of £18.711 million or 4% of the net 2024/25 Revenue Budget.
b) Composite Capital Budget and Housing Revenue Account Investment Programme 2023/24
A summary of the Council’s capital expenditure in 2023/24 is reflected within Note 35 to the Core Financial Statements on page
72.  Total gross capital expenditure was £167.690 million, comprising £23.110 million on the Council’s Housing Revenue
Account (HRA) and £144.580 million on the Council’s Composite (General Fund) Programme.  Several significant projects are
currently on-site and have made good progress during 2023/24.  The Council’s gross expenditure includes:
• £47.381 million on various school upgrade projects, including the replacement of Perth High School and North
Muirton/Balhousie Primary Schools (Riverside Primary School), Blairgowrie Recreation Centre, Perth Academy
refurbishments and the Early Learning and Childcare programme.
• £72.759 million on roads and transport projects, primarily the construction of the Perth Transport Futures project which
accounts for £54.3 million of this total.  The balance includes structural maintenance, road safety measures, and bridges. 
8 | Perth and Kinross Council Annual Accounts 2023/24 Page 27 of 214

Page 28

9 | Perth and Kinross Council Annual Accounts 2023/24 
• £4.017 million on cultural attractions (Perth Museum and Perth Art Gallery) and community projects (Letham Wellbeing
Hub).  The new Perth Museum was completed and opened to the public in March 2024.
• £20.423 million on other works, including flood schemes (£1.671 million); property, infrastructure and IT upgrades (£10.196
million); and waste initiatives (£2.429 million).  The balance of £6.127 million relates to expenditure on various, community
greenspace, planning and place-making projects, vehicles and other miscellaneous works.
• £23.110 million on the HRA including affordable housing new builds and buy backs (£10.133 million), triple glazing window
upgrades (£5.218 million), kitchen and bathroom upgrades (£2.215 million) and environmental improvements (£1.022
million).
Capital expenditure is funded by borrowing, asset sales, grants, other capital receipts, and Revenue Budget contributions.  The
Capital Financing Requirement (CFR, i.e. the underlying requirement to borrow for capital purposes) as at 31 March 2024 was
£816.351 million.  Actual capital debt was £743.240 million, comprising external borrowing of £628.200 million and a Public
Private Partnership (PPP) liability of £115.040 million.  The ratio of borrowing to the CFR for 2023/24 has reduced to 91.0%
(2022/23 106.7%).  During the year the CFR increased by £137.317 million, reflecting the capital expenditure above, less
capital receipts, grants and contributions and principal loan repayments.  The CFR increase included the £34.262 million as a
result of applying the service concession flexibility scheme that was approved by Council in February 2023.  The ratio to
borrowing reduced as a consequence of only a small amount of new borrowing being undertaken in the year and the service
concession adjustment.
The Council applied the revised accounting guidance for the treatment of service concession arrangements which has the
impact of spreading the cost of the principal repayments across the life of the asset, generating both a £31 million retrospective
benefit and a £3 million recurring benefit over the medium term.
c) General Fund Reserves
As at 31 March 2024 the Council had uncommitted General Fund balances of £18.711 million which represented 4% of the
Council’s 2024/25 Revenue Budget approved in April 2024.  Council policy, as set out in the Reserves Strategy approved by
Council on 28 February 2024, is to retain uncommitted reserves of between 2% and 4% of net revenue expenditure over the
medium term.  The Council’s Reserves Strategy will continue to be reviewed and updates will be considered by the Finance and
Resources Committee and the Council as part of the revenue monitoring cycle.  Full details of the Council’s General Fund
Reserves are shown on page 24 and page 68 of the Financial Statements, along with information on future commitments.
The Reserves position is summarised as follows: 
£m  £m
General Fund (83.794) Revaluation Reserve (425.931)
Housing Revenue Account (2.260) Capital Adjustments Account (338.099)
Capital Fund (31.026) Financial Instruments Adjustment
Account
16.358
Insurance Fund (1.709) Pensions Reserve 20.748
Capital Receipts Reserve (2.102) Employee Statutory Adjustment Account 8.186
Capital Grants Unapplied (0.087)  
TOTAL USABLE RESERVES (120.978) TOTAL UNUSABLE RESERVES (718.738)      
TOTAL RESERVES (839.716)
The Balance Sheet
The Balance Sheet on page 26 summarises the Council’s assets and liabilities as at 31 March 2024 and explanatory notes are
provided from page 29.  Total net assets have decreased by £27.486 million to £839.716 million.  Long Term Assets increased
by £89.653 million, current assets reduced by £104.340 million, current liabilities increased by £4.164 million and long-term
liabilities increased by £8.635 million.  The major changes in the Council’s Balance Sheet between 31 March 2023 and 31
March 2024 are explained in more detail in the following paragraphs.
Long Term Assets 
The value of long term assets increased by £89.653 million due to the continuation of the major capital investment being
undertaken by the Council described above.  
Current Assets
The level of Short-Term Investments reduced by £118.779 million with an increase of £13.520 million in the level of Cash or
Cash Equivalents.  This was the result of limited new long-term borrowing being undertaken in 2023/24 to fund the capital
programme, with existing balances being utilised in the first instance.  The increase in cash and cash equivalents follows an
increase in short-term deposits in line with cash flow requirements.
Current Liabilities
Short Term Borrowing increased by £7.284 million as a result of increased PWLB borrowing falling due within 12 months of the
balance sheet date compared to last year.  Short Term Creditors decreased by £4.493 million primarily due to lower amounts
payable to Scottish Government, Central Government, Other Local Authorities, NHS Bodies and Other Entities; this is slightly
offset by a reduction in the amount payable to Trade Creditors. 
9 | Perth and Kinross Council Annual Accounts 2023/24 Page 28 of 214

Page 29

10 | Perth and Kinross Council Annual Accounts 2023/24 
Long Term Liabilities
Long-Term Liabilities increased by £8.635 million due an increase in Long Term Borrowing of £16.979 million resulting from
new PWLB borrowing throughout the year, offset by existing PWLB debt with a maturity date within the next 12 months moving
into short term debt.  The overall increase in Long Term Borrowing is also offset by a reduction in the liability for public private
partnerships of £6.426 million in line with the remaining contract.
The Council’s annual Treasury Management Strategy outlines the Council’s policy in relation to borrowing and investment.  This
is prepared in accordance with the Code of Practice on Treasury Management in Local Authorities.  The majority of the Council’s
borrowing comes from the Public Works Loan Board and market loans.  Further details are provided at Note 39. 
Pensions Reserve
International Accounting Standard 19 Revised (IAS19R) requires the disclosure of the Council’s share of Tayside Pension
Fund’s assets and liabilities, both current and future.  The information disclosed in the accounts is provided to the Council by the
Pension Fund’s actuaries.  The position at 31 March 2024 indicates a net liability of £20.748 million compared to a liability of
£20.917 million on 31 March 2023 due to changes in assumptions.  This liability is based on a snapshot valuation at 31 March
2024 and is a result of prevailing market conditions at that date.  Triennial valuations of the Fund are carried out with the last
valuation having taken place at 31 March 2023.  Employer’s contributions were 17% of pensionable pay to 31 March 2024,
reducing to 15.7% from 1 April 2024.  For more information see Note 18.
Provisions, Contingencies and Write Offs
The Council made provision for a number of eventualities which may have an effect on the financial position of the Council.  The
reasons for the provisions are outlined in Note 30 on page 68.
There were a number of write-offs of debt and stock during the year which were approved by the Finance and Resources
Committee on 12 June 2024 – Authority to Write Off Debts and Obsolete Stock.
d) Accounting Ratios
The following financial indicators have been developed to provide an indication of the sustainability and affordability of the
Council’s financial plans.
FINANCIAL INDICATOR 2023/24 2022/23 PURPOSE
Uncommitted General Fund Reserve as
a proportion of Annual Budgeted Net
Expenditure
4.0% 4.0% Reflects the level of funding available to
manage financial risk / unplanned
expenditure.
Movement in the Uncommitted General
Fund Balance
£0.541m £1.592m Reflects the extent to which the Council has
increased its Uncommitted General Fund
Reserve.
Council Tax – In Year Collection Rate 97.5% 98.4% Demonstrates the Council’s effectiveness in
collecting council tax debt.
Ratio of Council Tax Income to Overall
Level of Funding
21.0% 21.0% This reflects the Council’s capacity to vary
expenditure by raising Council Tax Income.
Capital Financing Requirement £816.351m £679.034m Measurement of requirement to borrow for
capital purposes.
External Debt Levels £743.240m £724.527m Actual borrowing for capital investment
purposes.
Capital Financing Requirement Ratio 91.0% 106.7% Measurement of prudence in relation to
borrowing levels – borrowing only to invest
in capital.  
Ratio of Financing Costs to Net
Revenue Stream
4.1% 4.7% Measurement of the Council’s ability to fund
borrowing costs. 
e) Financial Statements
The primary financial statements presented within the Annual Accounts are as follows:
• The Movement in Reserves Statement reports movements on the different Reserves held by the Council analysed into
Usable Reserves (i.e. those that can be applied to fund expenditure or reduce local taxation) and Unusable Reserves.  
• The Comprehensive Income and Expenditure Statement reports the accounting cost of providing services in accordance
with generally accepted accounting practices, rather than the amount to be funded from taxation.  Councils raise taxation to
cover expenditure in accordance with regulations which may be different from the accounting cost.  The taxation position is
shown in the Movement in Reserves Statement.
• The Balance Sheet brings together all the assets and liabilities of the Council.  It is a statement of the resources of the
Council and how they have been financed.  It is also a report on the Council’s financial position at a particular point in time
and represents a snapshot of its financial affairs at the close of the year expressed in accounting terms.
10 | Perth and Kinross Council Annual Accounts 2023/24 Page 29 of 214

Page 30

11 | Perth and Kinross Council Annual Accounts 2023/24 
• The Cash Flow Statement summarises the inflows and outflows of cash and cash equivalents arising from transactions with
third parties on both day to day revenue transactions and capital activities.  Cash is defined for the purpose of this statement
as cash in hand and deposits repayable on demand less overdrafts repayable on demand.  Cash equivalents are
investments that mature in three months or less from the date of acquisition and that are readily convertible to known
amounts of cash with an insignificant risk of change in value.
The Code also requires the following to be included within the Annual Accounts:
• The Statement of Responsibilities for the Annual Accounts explains the responsibilities of the Council and of the Chief
Finance Officer as they relate to the Annual Accounts.
• The Notes to the Financial Statements provide further information on the above financial statements.
• The Notes include an Expenditure and Funding Analysis which compares the net expenditure that is chargeable to
taxation and rents and reconciles it to the Comprehensive Income and Expenditure Account.  The service analysis for both
the Expenditure and Funding Analysis and the Comprehensive Income and Expenditure Statement are now both provided in
the way in which the Council organises itself and manages financial performance.
• The Annual Governance Statement explains how the Council has complied with the Chartered Institute of Public Finance
and Accountancy (CIPFA) / Society of Local Authority Chief Executives (SOLACE) standard for good corporate governance
and meets the requirements of relevant legislation and current good practice.
• The Remuneration Report provides details of the Council’s remuneration of its senior councillors and senior officers with
regard to salary, taxable expenses and pension benefits and states how remuneration arrangements are managed.  The
report also provides information on exit packages agreed by the Council during the financial year.
Supplementary Financial Statements
The supplementary financial statements are as follows:
• The Housing Revenue Account shows the major elements of housing revenue account expenditure and how these are
funded by rents and other income.
• The Council Tax Income Account reports the gross and net income from Council Tax, together with details of the number
of properties on which Council Tax is levied, and the charge per property.
• The Non-Domestic Rates Income Account shows the gross and net income from non-domestic rates and details the
amount payable to the national non-domestic pool and resulting net income for the financial year to the Council that is shown
in the Comprehensive Income and Expenditure Statement. 
• The Charitable Trusts statement includes the summary Income and Expenditure Account and Balance Sheet of those
Charitable Trusts and Endowments administered by the Council.
• The Common Good statement includes the summary Income and Expenditure Account and Balance Sheet for the Common
Good Funds administered by the Council.
• The Group Accounts incorporate the share of the Council’s Managed Funds, Subsidiaries and Associates into the Group
Movement in Reserves Statement, Group Comprehensive Income and Expenditure Statement, Group Balance Sheet, Group
Cash Flow Statement and include the Reconciliation of the Single Entity (Council) Surplus or Deficit for the year to the Group
Surplus or Deficit.
7. Financial Outlook, Risks and Plans for the Future
The local government landscape has never been more complex or challenging.  Our communities continue to experience
challenges in relation to the cost of living resulting in increased levels of poverty, we continue to see rapid growth in our elderly
population and the impact of poor mental health and wellbeing.  Added to that we have an ambitious policy agenda to
regenerate our economy, reduce the impact of climate change, raise educational attainment, and to increase and optimise the
use of digital technology; all of which will come with a significant cost attached.  Furthermore, the strategic risk register
highlights significant challenges around failing to protect children and vulnerable adults from harm and mitigating or reducing the
impact of climate change across Perth and Kinross.
At the same time, the Council continues to experience unprecedented financial and other resource pressures because of real
terms reductions in funding, significant cost increases due to inflation and an increasing demand for services.
Like all councils, the pandemic had an impact on the needs of its citizens and the current cost of living challenges have only
added to the increasingly complex challenges the Council faces.  The medium to long term implications of Covid-19 remain
uncertain, the continuing war in Ukraine, increases in costs and the ongoing cost of living challenge are all placing significant
pressure on the workforce and the budget we have available to deliver services to communities. 
This means the Council is facing the most testing organisational pressures and financial circumstances it has ever experienced. 
To make best use of available resources, the Council will need to make decisions on what it will stop doing, do less of, do more
efficiently or do differently through redesign and working as collaboratively as possible with partners and communities. 
11 | Perth and Kinross Council Annual Accounts 2023/24 Page 30 of 214

Page 31

12 | Perth and Kinross Council Annual Accounts 2023/24 
As the Council faces these challenges, there are several key drivers which require it to transform its services and the way it
works with partners and communities to deliver improved outcomes.  These include:
• new and emerging priorities – social, economic and climate – that require the Council to review what, how and where it
delivers services to meet these challenges.
• a growing ageing population and increasing complexity of need and demand for services.
Through transforming how the Council works, driving efficiencies and reviewing service delivery, it will help address these
challenges and respond to these drivers.  The purpose of bringing together the Council’s budget and change plans is to make
greater links between how it allocates its resources and mitigates the impact of budget cuts whilst continuing to make best use
of available resources to meet its priorities.
The Council’s policy framework provides parameters as to how it will make difficult decisions to deliver its agreed priorities by
taking an evidence-based approach and placing a focus on need, not simply demand.
The new Corporate Plan 2022-28 approved in December 2022 sets out a vision for “a Perth and Kinross where everyone can
live life well, free from poverty and inequality”. 
The seven key priorities included in the plan show how the Council will address the challenges it faces and focus its work where
it is needed most to support the delivery of that vision.
In recognition of the challenges the Council faces and to ensure that it continues to deliver on its priorities, a Financial Strategy
was approved in June 2022.
The Financial Strategy is the link between the Council’s long-term priorities and its financial capacity.  Its aim is to build
resilience and ensure that the Council has an affordable and sustainable Medium Term Financial Plan, which directs its
resources to where they are most needed in line with Council agreed priorities and strategic outcomes.  The Financial Strategy
included a set of principles that assist in decision making. 
The budgetary strategy was further updated on October 2023 when the Council approved the Medium Term Financial Plan
(MTFP) which included agreement to set Revenue Budgets for 2024/25, 2025/26 and 2026/27.  The update of the MTFP
considered future funding levels, increasing costs and rising need / demand over the short to medium term, insofar as they may
impact on Perth and Kinross Council.
The MTFP places the development of budgetary strategy in the context of delivering the Council’s key outcomes and considers
the financial and process risks considered in the management of the Council’s finances.  The MTFP is designed to inform the
direction of travel of the Council for financial planning purposes.  As detailed budget proposals are developed, the broad
assumptions included within the MTFP are superseded by more detailed analysis of individual cost pressures and the
identification of budget reduction options.  The refinement of these assumptions is included in the final 2024/25 Revenue Budget
and 2025/26 and 2026/27 Provisional Revenue Budgets.  The 2024/25 Final Revenue Budget includes the continued use of the
Service Concession Scheme (Local Government Finance Circular 10/2022 - Finance Leases and Service Concession
Arrangements: Statutory Guidance refers) which will impact on the future financial management of the Council.
The final Housing Revenue Account Revenue Budget for 2024/25 and Five Year Capital Investment Programme and Rent
Strategy to 2028/29 were approved by the Housing and Social Wellbeing Committee on 24 January 2024 (Report No. 24/24
refers).  The Committee approved the recommendation of an average weekly rent increase for 2024/25 of 6% or £4.51 per week
in accordance with the requirements of the Council’s approved Housing Business Plan including supporting investment in new
council housing.
In June 2022, Council also agreed a five-year Transformation and Change Strategy.  This recognised that the shape and
structure of the organisation, as well as the way it operates, needs to change.
Transformation alone will not address the funding issues; budget cuts and service reductions will be required.  Some
transformation will reduce over spends, mitigate costs, or enable a shift of expenditure to new and emerging priorities.  
The Transformation and Change Strategy recognises that due to the size and complexity of the organisation a range of
approaches to change will be required: 
• transforming our customer’s experience 
• transforming the shape and structure of our organisation 
• transforming our systems and processes 
• transforming our spending and response to demand 
The need for transformation and change is not unique to Perth and Kinross.  All public and private sector services and
organisations are facing significant challenges and rethinking how they will operate in the future to address these challenges
and meet new and emerging demands.  In its Covid-19 Recovery Strategy, for a fairer future, the Scottish Government sets out
its vision for recovery and the actions it will take to address systemic inequalities made worse by Covid-19, make progress
towards a wellbeing economy, and accelerate inclusive person-centred public services.  The Scottish Government’s strategy
highlights the need to re-build public services and sets out how it will work differently with partners to deliver change.
12 | Perth and Kinross Council Annual Accounts 2023/24 Page 31 of 214

Page 32

13 | Perth and Kinross Council Annual Accounts 2023/24 
[1] M_O_R® is an industry standard methodology for Management of Risk which helps an organisation identify, assess,
and control risk at the strategic, programme, project and operational levels.
Financial sustainability will be achieved and maintained through prudent financial management, targeted investment and dis-
investment, increasing income, reducing costs and developing more efficient and effective ways of working.
Capital
The Council approved a revised six-year Composite Capital Budget for 2024/25 – 2029/30 on 28 February 2024.  The Housing
and Social Wellbeing Committee approved the Housing Revenue Account (HRA) Capital Budget for 2024/25 – 2028/29 on 24
January 2024.  Both these Capital plans were subsequently updated by the Finance and Resources Committee on 24 April
2024. 
The Council’s Composite Capital Budget includes major transport infrastructure improvements, including the Perth Transport
Futures project to create a third crossing over the River Tay, which is anticipated to be completed in Spring 2025.  Significant
investment in improvements to existing infrastructure is also included within the Capital Budget, including the replacement of
Blairgowrie Recreation Centre, as well as ongoing works within annual rolling programmes and road network improvements. 
Also included is the replacement of Perth High School.  There are also various school refurbishments under the Early Learning
and Childcare programme.  There is significant investment included in relation to new technologies such as a replacement for
the existing SWIFT Social Work database and investment in the Microsoft Estate, as well as the upgrading and replacement of
School Audio Visual equipment and other technology upgrades.  Other expenditure is planned in relation to various flood
schemes, the development of Perth City Centre cultural attractions, economic development and planning initiatives, parks and
public space improvements, waste reduction and recycling and property improvements. 
The HRA Investment Programme 2024/25 to 2028/29 continues to focus upon increasing the affordable housing stock with the
provision of new affordable housing and Council house buy-backs, as well as the enhancement of the existing housing stock,
including energy efficiency and external fabric maintenance.
The Capital Financing Requirement is estimated to peak at £1.274 billion in 2029/30 under current approved plans.  The annual
cost of servicing the borrowing and Public Private Partnership liabilities is being managed through the Capital Fund Strategy
within the Medium-Term Financial Plan.  This ensures the Council’s plan remains affordable, prudent and sustainable.
More detailed narrative on the Council’s capital investment plans, treasury management (borrowing and investments), prudential
indicators and loans fund liabilities can be found in the Council's Treasury and Investment Strategy and Prudential Indicators
2024/25 to 2029/30 report presented to Council on 6 March 2024.
Risk Management
Effective risk management is an essential element of good governance and integral to the Council’s ability to deliver positive
outcomes for its communities. 
The Council undertook a wholescale review of its approach to risk and developed and approved a new Risk Management
Framework in 2017.  Since then, it has been reviewed and further refined to ensure that it remains fit for purpose and reflects
the complex risk landscape of local government in these changing and challenging times.
The risk management framework has been developed based on best practice industry standards including the International
Standard in Risk Management – ISO: 31000 and the Office of Governance and Commerce (OGC) Management of Risk
Guidance (MoR) and guidance from the Association of Local Authority Risk Managers (ALARM) and comprises:
• Risk Management Policy – statement of the Council`s commitment to effective risk management;
• Risk Management Strategy – articulates our overall approach to risk and provides a detailed risk hierarchy;
• Risk Management Appetite Statement – describes the levels of risk the Council is prepared to tolerate in pursuit of our
objectives; and
• Risk Management Process Guide – provides a toolkit of techniques and processes to ensure that risk is managed
effectively and that our approach to risk management is consistent across the organisation.
Within the Council there is a cross-Service cohort of trained risk practitioners who provide technical guidance and support to
ensure that a consistent approach to risk management is taken across the whole organisation.  During 2023/24, there has been
continued focus on developing our online risk management system, PK Performs, and supporting Strategic Leads and Officers
from across the Council to understand and utilise this effectively.  A range of tools have been developed and launched to
support the roll out and enhance staff understanding of the M_O_R®[1] risk management process and introduce PK Performs. 
Risk trained officers have also worked with Risk Owners, and the Strategic Leadership Team (SLT) to review their current risks
both strategically and operationally.  This has taken the form of one-to-one support and an SLT workshop.  The Policy and
Governance Group have also carried out a critical review of the strategic risk register and have assessed the system of internal
control for risk management as part of the assurance process for the Annual Governance Statement. 
The focus for 2024/25 will be the ongoing roll out of PK Performs at the various levels required, including the transformation
programme and Health and Social Care Partnership.  We will also be looking at our approach of risk champions across the
organisation to support our training capacity and will implement a targeted programme of training.  Further workshops are
planned with Strategic Leads and the SLT to look at the overall challenges and opportunities facing the Council, and the impact
of any new emerging risks.  Scoring and benchmarking of all existing risks will also be challenged collectively to ensure a robust
approach is taken across the organisation and is reflective of national policy.   
13 | Perth and Kinross Council Annual Accounts 2023/24 Page 32 of 214

Page 33

14 | Perth and Kinross Council Annual Accounts 2023/24 
Workforce Management
The Council values its employees, their skills, dedication, and passion to ensure it delivers essential services to the people,
businesses and communities of Perth and Kinross.  Our people continue to be our most important asset and remain at the heart
of everything we do. 
The Council is on a journey of transformation and change, reshaping our organisation to ensure that we are prepared to deliver
the best public services we can for the people of Perth and Kinross, focused on need and within available resources.  Our
workforce is fundamental to the achievement of this goal.  We recognise the importance of creating an environment which
allows the people in our teams to be their best.  We have a clear vision, aims and aspiration for our workforce and bringing our
people on that journey is essential part of ensuring that our culture and ethos to be future-ready to deliver public services
remains pivotal.    
The Corporate Plan 2022/23 – 2027/28 sets out the key priorities and vision for the council, including how we will approach the
delivery of services.  Our Transformation and Change Strategy recognises that to achieve the ambitions of the Council we need
to transform our organisation including its size and shape.  Our Financial Strategy recognises the unprecedented budget
challenges and need for responsible decision-making given the context in which we work.  We have developed a new People
and Culture strategy for 2024-2028 which builds upon the foundation laid by these previous decisions to provide the enabler for
our continued journey to reshape our organisation and to ensure that we can deliver the best public services we can.  We
continue to focus our efforts on what makes change a success – our people – and have created learning and engagement
opportunities to support our ambition of growth and change.  Our People and Culture Strategy is based around our values of
Ambition, Compassion and Integrity to ensure that it delivers direction on not only what we need to do but also why, where and
how we should be delivering now and in the future.  We are committed to the delivery of a sustainable approach to workforce
development, and a flexible and agile workforce with the right skills, values and attitudes to meet the needs of our communities
now and into the future.  A focus on workplace culture, performance, boosting productivity, encouraging innovation and
creativity, embracing agility, digital technology and promoting wellbeing, reward, recognition and resilience are key.  These
commitments will enable the Council to match its ambition for transforming services, growing the economy, reducing
inequalities, protecting vulnerable people and supporting young people to be all they can be. 
The Council is a diverse local authority, supporting both local rural and urban areas.  We are committed to enhancing the quality
of life, not just for the people we serve, but also for the people who make our achievements possible, our dedicated and driven
employees.  We are operating within the context of changing demands for our services, financial pressures, an ageing
population and need for a range of highly specialist skills and services required for delivery.  Strong workforce planning, multi-
disciplinary teams, integrated working, locality-based decision-making, sound governance and effective measures to monitor our
progress to deliver our ambition is in place. 
We have implemented our executive leadership team, leadership competency framework and our new performance framework
to focus our contributions against Corporate Priorities.  This new operating model will ensure that we work together to focus on
positive outcomes for those we serve, implementing new ways of working, optimising existing and new technology and working
collaboratively with partners, Arm’s Length External Organisations and other local authorities.   
We continue to demonstrate the importance of inclusion by being a role model for initiatives such as Living Wage, Carer
Positive, Disability Confident, Young Person’s Guarantee and the Armed Forces Covenant.  These reflect the commitment we
make as an employer to support the different groups within our workforce and our communities.  Development and talent
management will also enable us to provide versatile people solutions to support the future strategic direction of the organisation. 
We also continue to invest in training and development opportunities for young people via Apprenticeship and Graduate
Programmes.  A focus on health and wellbeing and resilience are key to sustaining a healthy working environment and positive
wellbeing culture and we continue to review and refresh the wide range of health and wellbeing initiatives and support we offer
to our workforce.  The Council is proud to be a Fair Work employer and continues to apply Fair Work principles, consulting and
engaging with employees and their trade union representatives on improvements in our employment practices and
arrangements.  Equalities and fairness will continue to be core principles in its People and Culture Strategy.  This will ensure we
continue to have the right skills in the right place when we need them and will contribute to working together to ensure everyone
can live life well.
8. Supplementary Information
a) Group Accounts
The Code of Practice on Local Authority Accounting in the United Kingdom requires the Council to produce group financial
statements where it has an interest in entities that meet the definition of a subsidiary, associate or joint venture.  The Group
results are presented alongside the results for the Council in the Annual Accounts.  Further details of the associated entities that
have been incorporated into the financial statements can be found on page 99.  Horsecross Arts Limited now operates under its
new brand of Perth Theatre and Concert Hall Ltd.
The Council has an interest in six organisations (detailed on page 99) that do not form part of the main Accounts.  The Council
includes the results of these organisations in its Group Accounts due to the significant influence it has over their financial and
operating practices.  The Council also includes Charitable Trusts administered and controlled by the Council and Common Good
Funds as managed funds within the Group Accounts.    
14 | Perth and Kinross Council Annual Accounts 2023/24 Page 33 of 214

Page 34

15 | Perth and Kinross Council Annual Accounts 2023/24 
In accordance with the Code, the 2023/24 Group Accounts Statements are included on pages 94 to 98.  The basis for
consolidation is set out in the Notes to the Group Accounts Statements on pages 99 to 101.  The effect of consolidation is to
increase the Council’s net assets by £35.017 million resulting in a Group Balance Sheet showing net assets of £874.733
million at 31 March 2024 as set out on page 96.  
b) Common Good and Charitable Trust Funds 
Common Good Funds are administered by the local authority for the general benefit of the relevant communities.  Overall, the
Common Good Funds recorded an in-year surplus of £112,000 which, when applied to the surplus brought forward, results in an
accumulated revenue surplus as at 31 March 2024 of £2.370 million. 
Details of income and expenditure accounts and balance sheets can be found on pages 92 and 93 of the Annual Accounts. 
These funds are subject to similar accounting policies and procedures to those that are applied to the Council’s main accounts. 
The main source of income to Common Good Funds is rent.
The Council also administers several Charitable Trust Funds.  Details of income and expenditure accounts and balance sheets
can be found on page 91 of these Annual Accounts.  Overall, the Trust Funds recorded an in-year surplus of £262,000 which,
when applied to the surplus brought forward, results in an accumulated surplus as at 31 March 2024 of £3.723 million.
Perth and Kinross Council’s Trust Funds, for which the Council is the sole trustee, also have to prepare their own Trustees’
Annual Report and this is separately available on the Council website.
c) Public Private Partnerships / Design Build Finance Maintain
In September 2000 the Council entered into a 25-year PPP contract for the construction, maintenance and operation of office
accommodation and a car park.  In 2023/24 the Council paid £3.027 million to the contractor under the terms of the contract.
Between 2009 and 2012 six school campuses were also brought into operation at Blairgowrie, Glenearn, Loch Leven,
Strathearn, North Inch and Breadalbane.  The contractor’s obligation was to construct the schools and is to maintain them to a
pre agreed standard.  In 2023/24 the Council paid £21.6 million to the contractor under the terms of the contract.  In addition,
the Council paid £3.260 million in relation to Bertha Park High School in 2023/24.
During 2023/24, the Council applied the revised accounting guidance for the treatment of Service Concession arrangements
which has the impact of spreading the cost of the principal repayments across the life of the asset, generating both a
retrospective benefit and annual benefit in the immediate term.  The total unitary charge remains payable to the contractor,
however, the Service Concession flexibility permits the Council to account for the cost of the repayment element of the unitary
charge over the 50 year life of the asset rather than the 25 / 30 year contract life.  Note 36 Public Finance Initiatives and Similar
Contracts provides further detail.
9. Conclusion
The Council has continued to demonstrate sound financial management in 2023/24 by delivering services during
challenging times with the resources which are available to it.  The pressures being experienced by Services in relation
to demand are known and plans are in place to mitigate them.  The Council is also facing significant inflationary
pressures.  These pressures have been reflected in budgets and the medium financial plan.
The Council will face many challenges in the future from the combined effect of reduced resources; increasing demands
and expectations for our services.  It is confident that by working more creatively with all its residents and partners, it will
not only embrace these challenges but will maintain its performance and service delivery.
Acknowledgements
As in previous years, we would like to acknowledge the significant work of the finance teams in producing the Annual
Accounts and thank colleagues across the Council and the wider Group for their continuing support.     
Thomas Glen   Councillor Grant Laing   Scott Walker
Chief Executive  Leader of the Council  Chief Finance Officer
Perth and Kinross Council  Perth and Kinross Council  Perth and Kinross Council  
15 | Perth and Kinross Council Annual Accounts 2023/24 Page 34 of 214

Page 35

16 | Perth and Kinross Council Annual Accounts 2023/24 
Annual Governance Statement
1 Purpose
1.1 The purpose of the Annual Governance Statement is to give assurance to the people of Perth and Kinross, our elected
members, staff, partner agencies and other stakeholders that our governance arrangements are adequate and effective
and that our system of internal control is robust.
2 Scope of Responsibility
2.1 As well as providing assurance as to the effectiveness of the governance arrangements in place for the Council, this
Annual Governance Statement also covers the six organisations that are included in the Council’s Group Accounts.
• Live Active Leisure Limited (subsidiary)
• Perth Theatre and Concert Hall Limited (subsidiary)
• Culture Perth and Kinross Limited (subsidiary)
• Tayside Valuation Joint Board (associate) 
• Tayside Contracts (associate)
• Perth and Kinross Integration Joint Board (joint venture)
3 Our Governance Framework
3.1 Our governance framework comprises our culture, values, rules, resources, systems, tools and processes which we
have in place to help us achieve our strategic objectives.  We recognise that the following are fundamental elements of
good governance within public sector organisations: -
• Leadership, Culture and Values
• Vision, Direction and Purpose
• Stakeholder Engagement
• Organisational Development
• Effective Decision Making
• Internal Controls
• Scrutiny and Accountability
3.2 These fundamental elements of our governance framework reflect and seek to embed the principles of good governance
within the 2016 CIPFA Framework for Delivering Good Governance in Local Government, namely:
• Behaving with integrity, demonstrating strong commitment to ethical values and respecting the rule of law
• Defining outcomes in terms of sustainable economic, social and environmental benefits
• Ensuring openness and comprehensive stakeholder engagement
• Developing the entity’s capacity, including the capability of its leadership and the individuals within it
• Determining the interventions necessary to optimise the achievement of the intended outcomes
• Managing risks and performance through robust internal control and strong public financial management
• Implementing good practices in transparency, reporting and audit to deliver effective accountability.
3.3 A crucial part of the framework is the system of internal control which is designed to manage and mitigate risk in relation
to the achievement of our intended outcomes.
3.4 The Council manages risk through a continuous process of identification, assessment, evaluation, prioritisation and
mitigation.  We evaluate risk based on likelihood and impact in both financial and non-financial terms.  We do however
need to mitigate and manage risk proportionately; recognising that risk can never be eliminated completely and that only
reasonable assurance can ever be given.
4 Our Governance Arrangements 
4.1 Our culture and values are reflected in our behaviour and our decision-making.  Our policies, processes and procedures
including Elected Member and Employee Codes of Conduct, Whistleblowing and Anti-fraud and Corruption policies,
Elected Member Register of Interests and Gifts and Hospitality Policy ensure that, as a Council, we respect the rule of
law, behave with integrity, promote a culture of good governance and demonstrate a strong commitment to ethical
values.
4.2 There are appropriate and effective arrangements in place for the discharge of the following statutory functions:
• Head of Paid Service 
• Monitoring Officer 
• Chief Finance Officer
• Chief Social Work Officer
• Data Protection Officer  
16 | Perth and Kinross Council Annual Accounts 2023/24 Page 35 of 214

Page 36

17 | Perth and Kinross Council Annual Accounts 2023/24 
4.3 In 2022/23, officers and elected members engaged with our communities and worked together in partnership to develop
a new Corporate Plan which reflects the strategic priorities of the Council.  The more detailed delivery plan has been
developed within 2023/24 to ensure that we deliver on those objectives and continue to provide high quality operational
services.
4.4 Strategic, operational and political leadership is an integral element of effective governance.  Following the extensive
induction/refresher programme of training that was put in place for elected members following the Election, a long-term
programme of personal development is being implemented.  Similarly, an extensive leadership development programme
is in place for officers, with a new leadership competency framework being implemented to enhance capacity and
effectiveness, not only in senior leadership roles but across all levels of the organisation.
4.5 A review of the operational leadership structure, at the most senior level, concluded within the year, to ensure that it is fit
for purpose and better aligned to deliver on the strategic objectives and key priorities of the Council.  Transition
arrangements were established to the new strategic leadership model.  Whilst the structure has been designed to
support a new way of working, an unavoidable consequence has been the loss of skilled and experienced officers at a
senior level, the resultant risk requiring to be managed as part of that process.  At the same time a number of key and
experienced officers at service manager and team leader level have also left the organisation either through retiral or to
take up other opportunities elsewhere, which exacerbates that risk.  This will be managed through the ongoing
programme of leadership redesign and development.
4.6 Leadership within the organisation is effective with good communication between elected members and senior
management through Leaders’ meetings, Convenors meetings, Member Officer Working Groups and all-member
briefings, where appropriate.  There are also regular pre-agenda discussions in respect of each scheduled Council and
Committee meeting.
4.7 Our Local Outcomes Improvement Plan and Corporate Plan set out our vision and purpose and have been subject to
consultation and approval.  The Financial Strategy and approved Medium Term Financial Plan and Revenue and Capital
budgets prioritise how our financial resources are to be deployed.  The Transformation and Change Strategy highlights
our ambition to better support the delivery of services to the people of Perth and Kinross, particularly those in the
greatest need.  Key strategic documents such as the Capital Investment Blueprint and Corporate Asset Management
Strategy, Housing Investment Programme, Anti-Poverty Strategy, Economic Wellbeing Plan and Climate Change
Strategy provide the necessary direction to the organisation to enable it to deliver on its vision and priorities and to
achieve its purpose.  Furthermore, a new Sustainable Procurement Strategy has been developed and was considered by
Council in June 2024.
4.8 We recognise the importance of good stakeholder engagement and will continue to engage and work in partnership with
our communities, partners, and other stakeholders to ensure that we design and deliver the public services that our
communities need and value.  Our approach to consultations is based on the National Standards for Community
Engagement and we have established a wide range of consultation processes and procedures.  The Community
Empowerment (Scotland) Act 2015 provides a framework for improving the quality of engagement and participation
which is reflected in the Local Outcome Improvement Plan and our own Corporate Plan.
4.9 We are operating in an increasingly complex and financially challenging public sector landscape and must be able to
adapt and evolve our services and workforce to continue delivering cost-efficient, high-quality services.  Our people
remain our most valuable assets and as an organisation we will secure the best outcomes for our communities by
investing in the development of our workforce and of our leaders to ensure that they have the right skills and have
sufficient capacity to deliver.  Our approach is outlined in our Corporate Workforce Plan – Resourcing PKC Everyone
Has Something To Offer.  This approach has been reviewed in 2023/24 and a new refreshed People and Culture
Strategy has been developed and approved in 2024/25.
4.10 The Council’s Scheme of Administration sets out the Council’s decision-making structure in terms of roles, remits and
responsibilities to ensure transparency and accountability.  This has been revised to reflect the priorities and objectives of
the Council and the changes in the senior officer leadership structure.
4.11 We have a robust suite of policies, procedures and management processes to ensure that there are appropriate internal
controls in place in respect of: -
• Workforce Planning and Management  
• Financial Planning and Management 
• Risk and Performance Management 
• Transformation and Change Management
• Procurement 
• Major Investment Project Management
• Health and Safety 
• Information Management and Security
• Civil Contingencies and Business Continuity  
• Anti- Fraud and Corruption  
• Conflicts of Interests 
• Gifts and Hospitality 
• Whistleblowing and Reporting Concerns 
• Complaints Handling 
• Officer and Elected Member Conduct
17 | Perth and Kinross Council Annual Accounts 2023/24 Page 36 of 214

Page 37

18 | Perth and Kinross Council Annual Accounts 2023/24 
4.12 As a public body we must be open, transparent and accountable for our decisions, actions, and performance.  Our
management and democratic structures and processes are designed to facilitate effective decision making and the
proper scrutiny of those decisions and their impact in terms of performance and the achievement of our intended
outcomes.
4.13 The Council set a final revenue budget for the year 2024/25 in February 2024, along with provisional budgets for 2025/26
and 2026/27.  These revenue budgets demonstrate clear linkages with the Transformation and Change strategy.  Each
budget is allocated to a named budget holder.  Budgets are monitored regularly by Service Management Teams and
overall financial performance is monitored regularly by the Executive Leadership Team.  Council, through the Finance
and Resources Committee, receives regular financial monitoring information as part of the budgetary control framework
and provides the required political scrutiny of our financial management and performance.
4.14 Capital spend is monitored by Service Management Teams and the Executive Leadership Team and reported regularly to
the Finance and Resources Committee as part of the budgetary control framework.  
4.15 The Council publishes an Annual Performance Report on its performance against the objectives set out within the
Corporate Plan and Local Outcomes Improvement Plan.  In order to improve transparency and clarity of these links, a
Corporate Delivery and Improvement Plan has been developed. 
4.16 The Corporate Delivery and Improvement Plan, which was approved by Council in May 2024, strengthens the alignment
between the Corporate Plan priorities, improvement activity and budget and resource allocations, was developed and
subject to consultation in year.  It sets out detailed actions and outcomes for each priority and includes appropriate
performance indicators.  Performance is reported to the Executive Leadership Team and publicly through the Council’s
Scrutiny and Performance Committee and relevant themed committees.  Financial performance is publicly reported
through the Finance and Resources Committee and relevant service committees.
4.17 The Council has a published process for dealing with the following and annually reports on performance in this respect of
these areas: - 
• Complaints from members of the public
• Requests for accessing information under the Freedom of Information legislation
• Accessing information under the Data Protection legislation
5 Governance Assurance Process
5.1 The Council utilises a robust process of gathering assurance information from Service Management Teams, which
concludes with Certificates of Assurance being signed by the Directors for Strategy, People and Resources and
Economy, Place and Learning.
5.2 Corporate assurance has also been provided as regards the adequacy of the internal controls from the following Officers:
• Chief Finance Officer (S 95 Officer)
• Strategic Lead for Legal and Governance Services /Monitoring Officer
• Chief Internal Auditor
• Data Protection Officer
• Records and Information Security Manager
• Corporate Procurement Manager
• Corporate HR Manager
5.3 For Arm’s Length External Organisations, reliance has been placed upon:
• Unaudited financial statements of the companies (audited accounts will be scrutinised when available)
• Assurance self-assessment evaluations
• Terms and conditions of Service Level Agreements 
• Contract monitoring meetings with Services
• Performance information and financial monitoring reports to Services 
• Presentations and reports to the Scrutiny and Performance Committee 
5.4 For Tayside Contracts Joint Committee, Tayside Valuation Joint Board and Perth and Kinross Integration Joint Board,
reliance is placed upon each organisation’s own Annual Governance Statement.
5.5 The draft Annual Governance Statement is considered by the Strategic Leadership Team and the Council’s Scrutiny and
Performance Committee prior to inclusion within the final 2023/24 Annual Accounts.
5.6 The Annual Governance Statement is considered by the Audit and Risk Committee as part of the final 2023/24 Annual
Accounts.  
18 | Perth and Kinross Council Annual Accounts 2023/24 Page 37 of 214

Page 38

19 | Perth and Kinross Council Annual Accounts 2023/24 
6 Effectiveness of Governance Arrangements for 2023/24
6.1 Based on the assurance process outlined above, in terms of effectiveness, the Council’s governance arrangements
continue to be regarded as fit for purpose in accordance with the governance framework, subject to the areas identified for
review or improvement set out in section 8 below.
6.2 Our financial management arrangements conform with the governance requirements of the CIPFA Statement on the Role
of the Chief Financial Officer in Local Government (2015). 
6.3 Our assurance arrangements conform with the governance requirements of the CIPFA Statement on the Role of the Head
of Internal Audit (2010).
6.4 The Council has designated the Strategic Lead for Legal and Governance as the Senior Information Risk Owner, with the
Strategic Lead for Customer and Digital Services as Depute.  Our information security measures have been reviewed in
2023/24 to ensure continuing compliance with the Public Service Network (PSN) and other cyber security requirements.
6.5 Our counter-fraud and anti-corruption arrangements conform with CIPFA’s Code of Practice on Managing the Risks of
Fraud and Corruption.
6.6 The Chief Internal Auditor is the Council’s nominated Money Laundering Reporting Officer.  There has been no relevant
activity in respect of Council and its group during the year.
6.7 The Council’s Audit and Risk Committee operates in line with CIPFA’s Audit Committees: Practical Guidance for Local
Authorities.
6.8 We have structures in place which support constructive challenge and effective scrutiny to our system of internal control
and our broader governance arrangements.  In particular: -
• Audit and Risk Committee
• Scrutiny and Performance Committee
• Finance and Resources Committee
• Themed Committees
• Executive Leadership Team / Strategic Leadership Team
• Policy and Governance Group
• Transformation Board
• Internal Audit
• External Audit (presently Audit Scotland)
7 Opinion of the Chief Internal Auditor
7.1 Audit activity and performance is detailed in the Annual Report by the Chief Internal Auditor for the year 2023/24, which
was presented to the Council’s Audit and Risk Committee in June 2024.  The report contains the Chief Internal Auditor’s
opinion in respect of the effectiveness of the governance arrangements in place, as follows: -
“In the Chief Internal Auditor’s opinion, reasonable reliance can be placed on the Council’s risk
management and governance arrangements, and systems of internal control for 2023/24, subject
to management implementation of the agreed actions detailed in Internal Audit reports.”
8 Areas for Review/Continued Improvement Action
8.1 The last three years have demonstrated our reliance on technology and the way in which technology can shape and
influence how we deliver services and work as an organisation in the future.  We continue to review our cyber resilience
and information governance arrangements to ensure that they are fit for purpose and robust and continue to support new
and innovative ways of working.
8.2 The Council’s financial management, governance and reporting arrangements have been assessed against the financial
management standards set out within the CIPFA Financial Management Code (2019).  The Code is based upon the
standards set out elsewhere within the Annual Governance Statement and the Council is considered to be compliant with
the Code.  Improvement actions arising from the review include consideration of how the Council can build upon existing
practice in its budget consultation with stakeholders and strengthening existing reporting arrangements. 
8.3 In addition to these areas, there are some specific areas which will be held under review pending the outcome of current
transformation and change activity:
• Leadership culture and capacity
• Capacity and resources to lead, develop and deliver ongoing and future programme of transformation and change
• Strategic Procurement 
• Workforce planning and organisational development
• Use of the Financial Strategy to address financial pressures
• Our approach to community engagement and empowerment.  
19 | Perth and Kinross Council Annual Accounts 2023/24 Page 38 of 214

Page 39

20 | Perth and Kinross Council Annual Accounts 2023/24 
Conclusion and Opinion
The Council is legally required to review the effectiveness of its governance arrangements and to publish an Annual
Governance Statement, with its Annual Accounts.  The governance framework and, in particular, the system of internal
control, has been assessed in accordance with guidance from the Chartered Institute of Public Finance and Accountancy
(CIPFA).
The review of the effectiveness of the Council’s system of internal control and overall governance framework has been
informed by different sources assessing risk and providing assurance:-
• Executive Leadership Team/ Service Management Teams
• Chief Finance Officer
• Strategic Lead for Legal and Governance Services/ Monitoring Officer
• Chief Internal Auditor/ Internal Audit
• Data Protection Officer
• Policy and Governance Group
• External Audit 
• External agencies and inspectorates.
The Council’s Governance Framework is considered robust and effective.
Given the changes in the leadership structure from 1 April 2024, certificates of assurance have been obtained from
Strategic Leads, who are responsible for maintaining the system of internal control within their service area.  Strategic
Leads have reviewed the current governance arrangements and internal controls within their service area and provided
assurance that these are effective.
The Chief Finance Officer has provided assurance that the financial arrangements in place conform to the relevant
CIPFA requirements and that our expenditure is lawful.  The Monitoring Officer has provided assurance that our
governance arrangements ensure compliance with relevant laws, regulations, internal policies, and procedures.
The Chief Internal Auditor has provided assurance for the year 2023/24 and an Internal Audit plan will be developed for
2024/25 that will focus on areas which have been identified as corporate or service specific risks in relation to core
business and the delivery of the Council’s agreed strategic priorities. 
We are satisfied that our governance arrangements and, in particular, our system of internal control, continue to be
regarded as fit for purpose.  Any identified improvement actions will continue to be delivered and monitored through
service improvement plans, audit plans and change programmes to avoid duplication of effort. 
Our governance framework will continue to be reviewed and adapted where necessary to ensure that it remains robust
and effective.
Signed:  Signed:   
Thomas Glen   Councillor Grant Laing
Chief Executive  Leader of the Council   
20 | Perth and Kinross Council Annual Accounts 2023/24 Page 39 of 214

Page 40

21 | Perth and Kinross Council Annual Accounts 2023/24 
Independent auditor’s report to the members of Perth and Kinross Council and the Accounts
Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of Perth and Kinross Council and its group for the
year ended 31 March 2024 under Part VII of the Local Government (Scotland) Act 1973. The financial statements comprise the
group and council-only Movement in Reserves Statements, Comprehensive Income and Expenditure Statements, Balance
Sheets, and Cash Flow Statements, the council-only Housing Revenue Account Income and Expenditure Statement, the
Statement of Movements on the Housing Revenue Account Balance, the Council Tax Income Account, the Non-Domestic Rate
Income Account, the Charitable Trusts Income and Expenditure Account, the Charitable Trusts Balance Sheet, the Common
Good Income and Expenditure Account, the Common Good Balance Sheet, the group-only Reconciliation of the Single Entity
Deficit for the year to the Group Deficit, and notes to the financial statements, including material accounting policy information.
The financial reporting framework that has been applied in their preparation is applicable law and UK adopted international
accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom
2023/24 (the 2023/24 Code).
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the council and its group as at 31 March 2024 and of the income and
expenditure of the council and its group for the year then ended;
• have been properly prepared in accordance with UK adopted international accounting standards, as interpreted and
adapted by the 2023/24 Code; and
• have been prepared in accordance with the requirements of the Local Government (Scotland) Act 1973, The Local
Authority Accounts (Scotland) Regulations 2014, and the Local Government in Scotland Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing (UK) (ISAs (UK)), as required
by the Code of Audit Practice approved by the Accounts Commission for Scotland. My responsibilities under those standards
are further described in the auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed by the Accounts Commission on 3 April 2024. My period of appointment is four years, covering 2023/24 to 2026/27. I
am independent of the council and its group in accordance with the ethical requirements that are relevant to my audit of the
financial statements in the UK including the Financial Reporting Council’s Ethical Standard, and I have fulfilled my other ethical
responsibilities in accordance with these requirements. Non-audit services prohibited by the Ethical Standard were not provided
to the council. I believe that the audit evidence I have obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the financial statements is
appropriate.
Based on the work I have performed, I have not identified any material uncertainties relating to events or conditions that,
individually or collectively, may cast significant doubt on the ability of the council and its group to continue to adopt the going
concern basis of accounting for a period of at least twelve months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the current or future financial sustainability of the
council and its group. However, I report on the council’s arrangements for financial sustainability in a separate Annual Audit
Report available from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement that I identified and my
judgements thereon.
Responsibilities of the Chief Finance Officer and Audit and Risk Committee for the financial statements
As explained more fully in the Statement of Responsibilities for the Annual Accounts, the Chief Finance Officer is responsible for
the preparation of financial statements that give a true and fair view in accordance with the financial reporting framework, and
for such internal control as the Chief Finance Officer determines is necessary to enable the preparation of financial statements
that are free from material misstatement, whether due to fraud or error.  
21 | Perth and Kinross Council Annual Accounts 2023/24 Page 40 of 214

Page 41

22 | Perth and Kinross Council Annual Accounts 2023/24 
In preparing the financial statements, the Chief Finance Officer is responsible for assessing the ability of the council and its
group to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern
basis of accounting unless there is an intention to discontinue the operations of the council and its group.
The Audit and Risk Committee is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material
misstatement, whether due to fraud or error, and to issue an auditor’s report that includes my opinion. Reasonable assurance is
a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or
in the aggregate, they could reasonably be expected to influence the decisions of users taken on the basis of these financial
statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I design procedures in line with my
responsibilities outlined above to detect material misstatements in respect of irregularities, including fraud. Procedures include:
• using my understanding of the local government sector to identify that the Local Government (Scotland) Act 1973,
The Local Authority Accounts (Scotland) Regulations 2014, and the Local Government in Scotland Act 2003 are
significant in the context of the council and its group;
• inquiring of the Chief Finance Officer as to other laws or regulations that may be expected to have a fundamental
effect on the operations of the council and its group;
• inquiring of the Chief Finance Officer concerning the policies and procedures of the council and its group regarding
compliance with the applicable legal and regulatory framework;
• discussions among my audit team on the susceptibility of the financial statements to material misstatement, including
how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and capabilities to identify or
recognise non-compliance with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is affected by the inherent difficulty in
detecting irregularities, the effectiveness of the council’s controls, and the nature, timing and extent of the audit procedures
performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that result from error as fraud may
involve collusion, intentional omissions, misrepresentations, or the override of internal control. The capability of the audit to
detect fraud and other irregularities depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts manipulated, and the seniority of those
individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is located on the Financial Reporting
Council's website www.frc.org.uk/auditorsresponsibilities. This description forms part of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the Remuneration Report
I have audited the parts of the Remuneration Report described as audited. In my opinion, the audited parts of the Remuneration
Report have been properly prepared in accordance with The Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Chief Finance Officer is responsible for the other information in the annual accounts. The other information comprises the
Management Commentary, Annual Governance Statement, Statement of Responsibilities for the Annual Accounts and the
unaudited parts of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether the other information is materially
inconsistent with the financial statements or my knowledge obtained in the course of the audit or otherwise appears to be
materially misstated. If I identify such material inconsistencies or apparent material misstatements, I am required to determine
whether this gives rise to a material misstatement in the financial statements themselves. If, based on the work I have
performed, I conclude that there is a material misstatement of this other information, I am required to report that fact. I have
nothing to report in this regard.
22 | Perth and Kinross Council Annual Accounts 2023/24 Page 41 of 214

Page 42

23 | Perth and Kinross Council Annual Accounts 2023/24 
My opinion on the financial statements does not cover the other information and I do not express any form of assurance
conclusion thereon except on the Management Commentary and Annual Governance Statement to the extent explicitly stated in
the following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and Annual Governance
Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year for which the financial statements are
prepared is consistent with the financial statements and that report has been prepared in accordance with statutory
guidance issued under the Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial year for which the financial statements
are prepared is consistent with the financial statements and that report has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited parts of the Remuneration Report are not in agreement with the accounting
records; or
• I have not received all the information and explanations I require for my audit.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope responsibilities specified in the
Code of Audit Practice, including those in respect of Best Value, are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the Local Government (Scotland)
Act 1973 and for no other purpose. In accordance with paragraph 108 of the Code of Audit Practice, I do not undertake to have
responsibilities to members or officers, in their individual capacities, or to third parties. 
Rachel Browne CPFA, Audit Director
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN  
23 | Perth and Kinross Council Annual Accounts 2023/24 Page 42 of 214

Page 43

General Housing Capital Insurance Capital Capital Total Unusable Total
Fund Revenue Fund Fund Receipts Grants Usable Reserves Authority
Balance Account Reserve Unapplied Reserves (Note 32) Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 1 April 2022 (85,900) (3,282) (24,817) (1,366) (2,556) (87) (118,008) (623,763) (741,771)
Movement in reserves during
2022/23
Total Comprehensive Income
and Expenditure 16,868 6,401 0 0 0 0 23,269 (148,700) (125,431)
Adjustments to Usable
Reserves permitted by
accounting standards (4,511) (2,897) 0 0 0 0 (7,408) 7,408 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis (Note 5) 1,514 (2,029) 0 0 311 0 (204) 204 0
Decrease in 2022/23 13,871 1,475 0 0 311 0 15,657 (141,088) (125,431)
Transfers to/(from) Other
Statutory Reserves 2,306 (840) (1,526) 60 0 0 0 0 0
Balance at 31 March 2023
carried forward (69,723) (2,647) (26,343) (1,306) (2,245) (87) (102,351) (764,851) (867,202)
Movement in reserves during
2023/24
Total Comprehensive Income
and Expenditure 41,392 9,901 0 0 0 0 51,293 (23,807) 27,486
Adjustments to Usable
Reserves permitted by
accounting standards (6,454) (2,357) 0 0 0 0 (8,811) 8,811 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis (Note 5) (19,833) (7,157) 0 0 143 0 (26,847) 26,847 0
Adjustment to the statutory
repayment of debt for service
concession arrangements -
permitted flexibility (34,262) 0 0 0 0 0 (34,262) 34,262 0
(Increase) or Decrease in
2023/24 (19,157) 387 0 0 143 0 (18,627) 46,113 27,486
Transfers to/(from) Other
Statutory Reserves 5,086 0 (4,683) (403) 0 0 0 0
Balance at 31 March 2024
carried forward (83,794) (2,260) (31,026) (1,709) (2,102) (87) (120,978) (718,738) (839,716)
MOVEMENT IN RESERVES STATEMENT
24 | Perth and Kinross Council Annual Accounts 2023/24 Page 43 of 214

Page 44

2022/23
Gross Income Net Notes Gross Income Net
Expenditure Expenditure Expenditure Expenditure
£'000 £'000 £'000 £'000 £'000 £'000
COUNCIL SERVICES
232,396 (28,053) 204,343 Education and Children's Services 267,197 (31,060) 236,137
195,655 (107,341) 88,314 Health and Social Care 199,468 (110,826) 88,642
122,906 (34,613) 88,293 Communities 146,557 (35,594) 110,963
68,812 (23,927) 44,885 Corporate and Democratic Services 64,129 (24,464) 39,665
2,896 (2) 2,894 Chief Executives Service 4,707 (56) 4,651
36,843 (31,394) 5,449 Housing Revenue Account 43,489 (33,507) 9,982
1,338 0 1,338 Valuation Joint Board 1,436 0 1,436
660,846 (225,330) 435,516 COST OF SERVICES 726,983 (235,507) 491,476
474 (331) 143 Other Operating Income and Expenditure 8 0 (944) (944)
26,585 (6,276) 20,309
Financing and Investment Income and
Expenditure 9 25,811 (7,002) 18,809
0 (432,699) (432,699) Taxation and Non-Specific Grant Income 10 0 (458,048) (458,048)
687,905 (664,636) 23,269 Deficit on Provision of Services 752,794 (701,501) 51,293
(86,274) Surplus on revaluation of non current assets (24,003)
(62,426)
Remeasurement of the net defined benefit
liability/asset 196
(148,700)
Other Comprehensive Income and
Expenditure (23,807)
(125,431) Total Comprehensive Income and
Expenditure 27,486
2023/24
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT
25 | Perth and Kinross Council Annual Accounts 2023/24 Page 44 of 214

Page 45

Notes
£'000 £'000
1,421,864 Property, Plant and Equipment 21 1,512,833
51,814 Heritage Assets 22 51,814
15,015 Investment Property 23 14,715
963 Intangible Assets 24 348
403 Assets Held for Sale 25 0
541 Long Term Debtors 26 543
1,490,600 Long Term Assets 1,580,253
155,339 Short Term Investments 36,560
273 Assets Held for Sale 25 676
441 Inventories 27 632
52,019 Short Term Debtors 28 52,344
17,663 Cash and Cash Equivalents 44 31,183
225,735 Current Assets 121,395
(12,114) Short Term Borrowing 39 (19,398)
(96,104) Short Term Creditors 29 (91,611)
(295) Provisions 30 (1,668)
(108,513) Current Liabilities (112,677)
(5,312) Provisions 30 (3,564)
(599,351) Long Term Borrowing 39 (616,330)
(135,957) Other Long Term Liabilities 18 and 36 (129,361)
(740,620) Long Term Liabilities (749,255)
867,202 NET ASSETS 839,716
102,351 Usable Reserves 120,978
764,851 Unusable Reserves 32 718,738
867,202 TOTAL RESERVES 839,716
The Unaudited Annual Accounts were issued on 24 June 2024 and the Audited Annual Accounts were
authorised for issue on 2 December 2024.
The accompanying notes form an integral part of these financial statements.
Scott Walker CPFA
Chief Finance Officer
Date:
31 March 202431 March 2023
BALANCE SHEET
26 | Perth and Kinross Council Annual Accounts 2023/24 Page 45 of 214

Page 46

2022/23 Notes 2023/24
£'000 £'000
(23,269) Deficit on the provision of services (51,293)
82,679 Adjustments to net deficit on the provision of services for non cash movements 86,840
(44,143)
Adjustments for items included in the net deficit on the provision of services that
are investing and financing activities (49,490)
15,267 Net cash flows from Operating Activities (13,943)
(22,818) Investing Activities 42 8,267
(13,223) Financing Activities 43 19,196
(20,774) Net (decrease)/increase in cash and cash equivalents 13,520
38,437 Cash and cash equivalents at the beginning of the reporting period 17,663
17,663 Cash and cash equivalents at the end of the reporting period 44 31,183
CASH FLOW STATEMENT
27 | Perth and Kinross Council Annual Accounts 2023/24 Page 46 of 214

Page 47

28 | Perth and Kinross Council Annual Accounts 2023/24 
Statement of Responsibilities for the Annual Accounts
The Council’s Responsibilities
The Council is required:
- to make arrangements for the proper administration of its financial affairs and to ensure that one of its officers has the
responsibility for those affairs under Section 95 of the Local Government (Scotland) Act 1973.  In this Council that
officer is the Chief Finance Officer. 
- to manage its affairs to secure economic, efficient and effective use of resources and safeguard its assets.
- ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority Accounts (Scotland)
Regulations 2014), and so far as is compatible with that legislation, in accordance with proper accounting practices
(section 12 of the Local Government in Scotland Act 2003).
- approve the Annual Accounts for signature.
I confirm that these Annual Accounts were approved for signature by the Audit and Risk Committee at its meeting on 2
December 2024.
Signed on behalf of Perth and Kinross Council 
Councillor Grant Laing
Leader of the Council 
Date: 
The Responsibilities of the Chief Finance Officer
The Chief Finance Officer is responsible for the preparation of the Council’s Annual Accounts in accordance with proper
practices as required by legislation and as set out in the CIPFA/LASAAC Code of Practice on Local Authority Accounting in the
United Kingdom (the Accounting Code).  
In preparing these Annual Accounts, the Chief Finance Officer has:
• selected suitable accounting policies and applied them consistently;
• made judgements and estimates that were reasonable and prudent;
• complied with legislation; and
• complied with the Local Authority Accounting Code (in so far as it is compatible with legislation).
The Chief Finance Officer has also:
- kept proper accounting records which were up to date;
- taken reasonable steps for the prevention and detection of fraud and other irregularities;
- used the going concern basis of accounting on the assumption that the Council will continue in operational existence
for the twelve months following the approval of the Annual Accounts.
I certify that the Annual Accounts give a true and fair view of the financial position of the Council and its group at the reporting
date and the transactions of the Council and its Group for the year ended 31 March 2024. 
Scott Walker CPFA
Chief Finance Officer
Date: 
28 | Perth and Kinross Council Annual Accounts 2023/24 Page 47 of 214

Page 48

29 | Perth and Kinross Council Annual Accounts 2023/24 
Notes to the Financial Statements
1. Accounting Policies
General
The Annual Accounts have been prepared in accordance with International Financial Reporting Standards (IFRS) and
adapted to the Code of Practice as required by the Local Authority Accounts (Scotland) Regulations 2014 and section 12
of the Local Government in Scotland Act 2003.  These practices primarily comprise the Code of Practice on Local
Authority Accounting in the United Kingdom 2023/24 and supported by International Financial Reporting Standards.  The
Annual Accounts are intended to present a true and fair view of the financial position and transactions of the authority
and have been prepared in accordance with the fundamental accounting principles of relevance, reliability, comparability,
understandability and materiality.  
The accounting convention adopted in the Annual Accounts is principally historical cost, modified by the revaluation of
certain categories of non-current assets and financial instruments.
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, or when the Council is entitled to the income, not simply when
cash payments are made or received.  
In particular:
• Revenue from contracts with service recipients, whether for services or the provision of goods, is recognised
when (or as) the goods and services are transferred to the service recipient in accordance with the performance
obligations in the contract.
• Supplies are recorded as expenditure when they are consumed – where there is a gap between the date supplies
are received and their consumption, they are carried as inventories on the Balance Sheet.
• Expenses in relation to services received (including those rendered by the Council’s officers) are recorded as
expenditure when the services are received, rather than when payments are made.
• Interest payable on borrowings and receivable on investments is accounted for on the basis of the effective
interest rate for the relevant financial instrument rather than the cash flows fixed or determined by the contract.
• Where revenue and expenditure have been recognised but cash has not been received or paid, a debtor or
creditor for the relevant amount is recorded in the Balance Sheet.  Where there is evidence that debts are unlikely
to be settled, the balance of debtors is written down and a charge made to revenue for the income that might not
be collected.
• Where the Council is acting as an agent for another party (e.g. in the collection of Non-Domestic Rates and Water
and Wastewater), income and expenditure are recognised only to the extent that commission is receivable by the
Council for the agency services rendered or the Council incurs expenses directly on its own behalf in rendering
the services.
Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on notice of not
more than 24 hours.  Cash equivalents are highly liquid investments that mature in three months or less from the date of
acquisition and that are readily convertible to known amounts of cash with insignificant risk of change in value.  In the
Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts that are repayable on demand and
form an integral part of the Council’s cash management.
Changes in Accounting Policies and Estimates and Errors
Changes in accounting policies are only made when required by proper accounting practices or the change provides
more reliable or relevant information about the effect of transactions, other events or conditions on the Council’s financial
position or financial performance.  Where a change is made, it is applied retrospectively by adjusting opening balances
and comparative amounts for the prior period as if the new policy had always been applied.  
Changes in accounting estimates are accounted for prospectively, i.e., in the current and future years affected by the
change.  Material errors discovered in prior period figures are corrected retrospectively by amending opening balances
and comparative amounts for the prior period.  
29 | Perth and Kinross Council Annual Accounts 2023/24 Page 48 of 214

Page 49

30 | Perth and Kinross Council Annual Accounts 2023/24 
Charges to Revenue for Non-Current Assets
Services, support services and trading accounts are debited with the following amounts to record the cost of holding fixed
assets during the year:
• depreciation attributable to the assets used by the relevant service;
• revaluation and impairment losses on assets used by the service where there are no accumulated gains in the
Revaluation Reserve against which the losses can be written off;
• amortisation of intangible fixed assets attributable to the service.
The Council is not required to raise council tax to cover depreciation, revaluation and impairment losses or amortisations. 
However, it is required to make an annual provision from revenue to contribute towards the reduction in its overall
borrowing requirement equal to an amount calculated on a prudent basis determined by the Council in accordance with
the Statutory Repayment of Loans Fund Advances.  Depreciation, revaluation and impairment losses and amortisations
are therefore replaced by revenue provision in the General Fund Balance, by way of an adjusting transaction with the
Capital Adjustment Account in the Movement in Reserves Statement for the difference between the two.
Contingent Assets and Liabilities
A contingent asset arises where an event has taken place that gives the Council a possible asset whose existence will
only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the control of the Council. 
A contingent liability arises where an event has taken place that gives the Council a possible obligation whose existence
will only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the control of the
Council.  Contingent liabilities also arise in circumstances where a provision would otherwise be made but either it is not
probable that an outflow of resources will be required or the amount of the obligation cannot be measured reliably.
Contingent Assets and Liabilities are not recognised in the Balance Sheet but disclosed in a note to the accounts.
Employee Benefits
Benefits Payable During Employment
Short-term employee benefits (those that fall due wholly within 12 months of the year-end), such as wages and salaries,
paid annual leave and paid sick leave, bonuses and non-monetary benefits (e.g. cars) for current employees, are
recognised as an expense in the year in which employees render service to the Council.  An accrual is made against
services in the Surplus or Deficit on the Provision of Services for the cost of holiday entitlements and other forms of leave
earned by employees but not taken before the year-end and which employees can carry forward into the next financial
year.  Any accrual made is required under statute to be reversed out of the General Fund Balance by a credit to the
Employee Statutory Absences Adjustment Account in the Movement in Reserves Statement.
Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to terminate an officer’s employment
before the normal retirement date or an officer’s decision to accept voluntary redundancy and are charged in the
Comprehensive Income and Expenditure Statement when the Council is demonstrably committed to terminate the
employment of an officer.
Where termination benefits involve the enhancement of pensions, statutory provisions require the General Fund Balance
to be charged with the amount payable by the Council to the pension fund or pensioner in the year, not the amount
calculated according to the relevant accounting standards.  In the Movement in Reserves Statement, appropriations are
required to and from the Pensions Reserve to remove the notional debits and credits for termination benefits related to
pensions enhancements and replace them with debits for the cash paid to the pension fund and pensioners and any
such amounts payable but unpaid at the year-end.
Post-Employment Benefits
Employees of the Council are members of two separate pension schemes: The Scottish Teachers’ Superannuation
Scheme and the Local Government Pension Scheme.  
The Scottish Teachers’ Superannuation Scheme is a statutory unfunded defined final benefit salary scheme administered
nationally by the Scottish Public Pensions Agency on behalf of the Scottish Government.  There are no investment
assets built up under the scheme to meet pension liabilities.  The contributions paid into the scheme by the Council and
teaching employees are determined nationally and member’s pension benefits are prescribed under the Teachers’
Superannuation (Scotland) Regulations 2005 with the Scottish Government being responsible for meeting the scheme’s
liabilities.  
Other employees, subject to certain qualifying criteria, are eligible to join the Local Government Pension Scheme
(LGPS).  The LGPS is a statutory funded defined final benefit salary scheme operated through local pension funds. 
Perth and Kinross Council and its employees pay contributions into the Tayside Pension Fund administered by Dundee
City Council calculated at a level to balance the pension liabilities with investment assets.  The contributions paid into the
scheme by employees and member pension benefits are prescribed, for the period to which the accounts relate, by the
Local Government Pensions Scheme (Scotland) Regulations 1998 as amended.  Perth and Kinross Council’s
contributions, as employer, into the Tayside Pension Fund are subject to the advice of the Fund actuary.  
30 | Perth and Kinross Council Annual Accounts 2023/24 Page 49 of 214

Page 50

31 | Perth and Kinross Council Annual Accounts 2023/24 
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned as employees worked
for the Council.  However, the arrangements for the teachers’ scheme mean that liabilities for these benefits cannot be
attributed specifically to the Council.  The scheme is therefore accounted for as if it were a defined contributions scheme
– no liability for future payments of benefits is recognised in the Balance Sheet and the Education Service line in the
Comprehensive Income and Expenditure Statements is charged with the employer’s contributions payable to Teachers’
Pensions in the year.
The Local Government Scheme is accounted for as a defined benefits scheme.  The liabilities of the Tayside Pension
Fund attributable to the Council are included in the Balance Sheet on an actuarial basis using the projected unit method
– i.e. an assessment of the future payments that will be made in relation to retirement benefits earned to date by
employees, based on assumptions about mortality rates, employee turnover rates, etc., and projected earnings for
current employees.  Liabilities are discounted to their value at current prices, using a discount rate which is based on the
indicative rate of return on the high quality corporate bond index (i Boxx AA).
The assets of the Tayside Pension Fund attributable to the Council are included in the Balance Sheet at their fair value:
• quoted securities – current bid price;
• unquoted securities – professional estimate;
• unitised securities – current bid price;
• property – market value.
The change in the net pension’s asset / liability is analysed into the following components:
• Service cost comprising:
o Current service cost – the increase in liabilities as result of years of service earned this year – allocated in
the Comprehensive Income and Expenditure Statement to the services for which the employees worked;
o past service cost – the increase in liabilities as a result of a scheme amendment or curtailment whose
effect relates to years of service earned in earlier years – debited to the Surplus/Deficit on the Provision of
Services in the Comprehensive Income and Expenditure Statement as part of Non Distributed Costs;
o net interest on the net defined liability / (asset), i.e. net interest expense for the authority – the change
during the period in the net defined benefit liability / (asset) that arises from the passage of time charged to
the Financing and Investment Income and Expenditure line of the Comprehensive Income and
Expenditure Statement – this is calculated by applying the discount rate used to measure the defined
benefit obligation at the beginning of the period to the net defined benefit liability / (asset) at the end of the
period – taking into account any changes in the net defined benefit liability / (asset) during the period as a
result of contribution and benefit payments.
• Remeasurements comprising:
o the return on plan assets - excluding amounts included in net interest on the net defined benefit liability / 
(asset) – charged to the Pensions Reserve as Other Comprehensive Income and Expenditure;
o actuarial gains and losses – changes in the net pensions liability that arise because events have not
coincided with assumptions made at the last actuarial valuation or because the actuaries have updated
their assumptions – charged to the Pensions Reserve as Other Comprehensive Income and Expenditure.
• Contributions paid to the Tayside Pension Fund – cash paid as employer’s contributions to the pension fund in
settlement of liabilities; not accounted for as an expense. 
In relation to retirement benefits, statutory provisions require the General Fund Balance to be charged with the amount
payable by the Council to the pension fund or directly to pensioners in the year, not the amount calculated according to
the relevant accounting standards.  In the Movement in Reserves Statement, this means that there are appropriations to
and from the Pensions Reserve to remove the notional debits and credits for retirement benefits and replace them with
debits for the cash paid to the pension fund and pensioners and any such amounts payable but unpaid at the year-end. 
The negative balance that arises on the Pensions Reserve thereby measures the beneficial impact on the General Fund
of being required to account for retirement benefits on the basis of cash flows rather than as benefits are earned by
employees.
Discretionary Benefits
The Council also has restricted powers to make discretionary awards of retirement benefits in the event of early
retirements.  Any liabilities estimated to arise as a result of an award to any member of staff (including teachers) are
accrued in the year of the decision to make the award and accounted for using the same policies as are applied to the
Local Government Pension Scheme.  
31 | Perth and Kinross Council Annual Accounts 2023/24 Page 50 of 214

Page 51

32 | Perth and Kinross Council Annual Accounts 2023/24 
Events after the Reporting Period
Events after the reporting period are those events, both favourable and unfavourable, that occur between the end of the
reporting period and the date when the Annual Accounts are authorised for issue.  Two types of events can be identified:
• those that provide evidence of conditions that existed at the end of the reporting period – the Annual Accounts are
adjusted to reflect such events;
• those that are indicative of conditions that arose after the reporting period – the Annual Accounts are not adjusted
to reflect such events, but where a category of events would have a material effect, disclosure is made in the
notes of the nature of the events and their estimated financial effect.
Events taking place after the date of authorisation for issue are not reflected in the Annual Accounts.
Fair Value Measurement
The Council measures some of its non-financial assets such as surplus assets and investment properties at fair value at
each reporting date.  Fair value is the price that would be received to sell an asset or paid to transfer a liability in an
orderly transaction between market participants at the measurement date.  The fair value measurement assumes that
the transaction to sell the asset or transfer the liability takes place either:
a) in the principal market for the asset or liability, or
b) in the absence of a principal market, in the most advantageous market for the asset or liability.
The Council measures the fair value of an asset or liability using the assumptions that market participants would use
when pricing the asset or liability, assuming that market participants act in their economic best interest.
When measuring the fair value of a non-financial asset, the Council takes into account a market participant’s ability to
generate economic benefits by using the asset in its highest and best use or by selling it to another market participant
that would use the asset in its highest and best use.
The Council uses valuation techniques that are appropriate in the circumstances and for which sufficient data is
available, maximising the use of relevant observable inputs and minimising the use of unobservable inputs.
Inputs to the valuation techniques in respect of assets and liabilities for which fair value is measured or disclosed in the
Council’s financial statements are categorised within the fair value hierarchy, as follows:
Level 1: quoted prices (unadjusted) in active markets for identical assets or liabilities that the authority can access at
the measurement date 
Level 2: inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either
directly or indirectly 
Level 3: unobservable inputs for the asset or liability.
Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when the Council becomes a party to the contractual provisions
of a financial instrument and are initially measured at fair value and carried at their amortised cost.  Annual charges to
the Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement for
interest payable are based on the carrying amount of the liability, multiplied by the effective rate of interest for the
instrument.  The effective interest rate is the rate that exactly discounts estimated future cash payments over the life of
the instrument to the amount at which it was originally recognised.
For most of the borrowings that the Council has, this means that the amount presented in the Balance Sheet is the
outstanding principal repayable (plus accrued interest) and interest charged to the Comprehensive Income and
Expenditure Statement is the amount payable for the year according to the loan agreement.  
Gains and losses on the repurchase or early settlement of borrowing are credited or debited to the Financing and
Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement in the year of
repurchase/settlement.  However, where repurchase has taken place as part of a restructuring of the loan portfolio that
involves the modification or exchange of existing instruments, the premium or discount respectively is deducted from or
added to the amortised cost of the new or modified loan and the write-down to the Comprehensive Income and
Expenditure Statement is spread over the life of the loan by an adjustment to the effective interest rate.
Where premiums and discounts have been charged to the Comprehensive Income and Expenditure Statement,
regulations allow the impact on the General Fund Balance to be spread over future years.  The Council has a policy of
spreading the gain/loss over the term of the replacement loan.  The reconciliation of amounts charged to the
Comprehensive Income and Expenditure Statement to the net charge required against the General Fund Balance is
managed by a transfer to or from the Financial Instruments Adjustment Account in the Movement in Reserves Statement.  
32 | Perth and Kinross Council Annual Accounts 2023/24 Page 51 of 214

Page 52

33 | Perth and Kinross Council Annual Accounts 2023/24 
Financial Assets
Financial assets are classified based upon a classification and measurement approach that reflects the business model
for holding the financial assets and their cashflow characteristics.  There are three main classes of financial assets
measured at:-
• amortised cost
• fair value through profit or loss (FVPL), and
• fair value through other comprehensive income (FVOCI)
The Council’s business model is to hold investments to collect contractual cash flows.  Financial assets are therefore
classified as amortised cost, except for those whose contractual payments are not solely payment of principal and
interest (i.e. where cash flows do not take the form of a basic debt instrument).
Loans and receivables are recognised on the Balance Sheet when the Council becomes a party to the contractual
provisions of a financial instrument and are initially measured at fair value.  They are subsequently measured at their
amortised cost.  Annual credits to the Financing and Investment Income and Expenditure line in the Comprehensive
Income and Expenditure Statement for interest receivable are based on the carrying amount of the asset multiplied by
the effective rate of interest for the instrument.  For deposits that the Council has made, this means that the amount
presented in the Balance Sheet is the outstanding principal receivable (plus accrued interest) and interest credited to the
Comprehensive Income and Expenditure Statement is the amount receivable for the year in the agreement.
However, the Council has made loans to various organisations at less than market rates (soft loans).  When a soft loan is
made, a loss is recorded in the Comprehensive Income and Expenditure Statement (debited to the appropriate service)
for the present value of the interest that will be foregone over the life of the instrument, resulting in a lower amortised cost
than the outstanding principal.  In subsequent years interest is credited to the Financing and Investment Income and
Expenditure line in the Comprehensive Income and Expenditure Statement at a higher effective rate of interest than the
rate receivable from the voluntary organisations, with the difference serving to increase the amortised cost of the loan in
the Balance Sheet. 
Where assets are identified as impaired because of a likelihood arising from a past event that payments due under the
contract will not be made, the asset is written down and a charge made to the Financing and Investment Income and
Expenditure line in the Comprehensive Income and Expenditure Statement.  The impairment loss is measured as the
difference between the carrying amount and the present value of the revised future cash flows discounted at the asset’s
original effective interest rate.
Any gains and losses that arise on the de-recognition of an asset are credited/debited to the Financing and Investment
Income and Expenditure line in the year they incur in the Comprehensive Income and Expenditure Statement.
Going Concern
The Chief Finance Officer is responsible for making an annual assessment of whether it is appropriate to prepare the
accounts on a going concern basis.  In accordance with the Code of Practice on Local Authority Accounting in the United
Kingdom, an authority’s financial statements shall be prepared on a going concern basis; that is, the accounts should be
prepared on the assumption that the functions of the authority will continue in operational existence for at least twelve
months from the date of approval of the financial statements and it can only be discontinued under statutory prescription. 
The Council has significant net assets, investments and cash and a track record of preparing a balanced budget which
incorporates significant savings that are subsequently achieved.  The Covid pandemic continues to have an impact on
the finance and operations of the Council.  The Council has put in place robust measures to ensure the continuing strong
financial management of its activities which demonstrates its ability to continue as a going concern.  Work continues to
assess the impacts of the pandemic and the mitigating actions taken to return to a balanced budget.  Taken together, the
Chief Finance Officer has determined that it remains appropriate to prepare the financial statements on a going concern
basis.
Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third party contributions and donations are
recognised as due to the Council when there is reasonable assurance that:
• the Council will comply with the conditions attached to the payments; and
• the grants or contributions will be received.
Amounts recognised as due to the Council are not credited to the Comprehensive Income and Expenditure Statement
until conditions attaching to the grant or contribution have been satisfied.  Conditions are stipulations that specify that the
future economic benefits or service potential embodied in the asset acquired using the grant or contribution are required
to be consumed by the recipient as specified or future economic benefits or service potential must be returned to the
transferor.
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance
Sheet as creditors.  When conditions are satisfied, the grant or contribution is credited to the relevant service line
(attributable revenue grants/contributions) or Taxation and Non-Specific Grant Income (non-ring-fenced revenue grants
and all capital grants) in the Comprehensive Income and Expenditure Statement.
33 | Perth and Kinross Council Annual Accounts 2023/24 Page 52 of 214

Page 53

34 | Perth and Kinross Council Annual Accounts 2023/24 
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are reversed out of the
General Fund Balance in the Movement in Reserves Statement.  Where the grant has yet to be used to finance capital
expenditure, it is posted to the Capital Grants Unapplied Account.  Where it has been applied, it is posted to the Capital
Adjustment Account.  Amounts in the Capital Grants Unapplied Account are transferred to the Capital Adjustment
Account once they have been applied to fund capital expenditure.
Heritage Assets
Heritage Assets are those assets that are intended to be preserved in trust for future generations because of their
cultural, environmental or historical associations.  Heritage Assets include museum and gallery collections and works of
art.  These assets are held by the Council in pursuit of its overall objectives in relation to the maintenance of the heritage. 
Since 1 April 2016 Culture Perth and Kinross has responsibility for the delivery and development of museum and library
services in Perth and Kinross.  The Trust manages the museum and gallery collections on behalf of the Council, however
the Council will continue to be custodian of the collections.
Tangible Heritage Assets 
The Council’s Heritage Assets are held in the Perth Museum, Perth Art Gallery and Alyth Museum.  The collections
include Art, History and Natural History and are held in support of Council objectives i.e. to increase knowledge,
understanding and appreciation of the local area and its history.  Heritage Assets are recognised and measured
(including the treatment of revaluation gains and losses) in accordance with the Council’s accounting policies on
property, plant and equipment.  
However, some of the measurement rules are relaxed in relation to heritage assets as detailed below.  The Council has
embarked upon a revaluation programme for all collection items deemed to have significant value, these being mainly
items within Fine and Applied Art collections.  In recognition of the key qualitative characteristics of the financial
statements, i.e. understandability, relevance, reliability and comparability, the Council has chosen to apply a £10,000 de-
minimus level for which items will be recognised within the Balance Sheet.  The exclusion of individual items having a
value of less than £10,000 does not impact upon the characteristics of the financial statements and a summary of the
main collections and applicable accounting treatment is as follows.
Art Collection
The Fine Art collection includes paintings and sketches in various mediums, and although international in scope, its
greatest strength is in the holding of Scottish pictures.  The collection seeks to retain a balance between the historical
and the contemporary whilst continuing to develop the holdings of works of specifically local interest.  The Applied Art
collection has been acquired since 1785 through purchase, gift or bequest.  It covers a wide variety of objects and
materials, within which the collections of Perth silver and Perthshire glass are unsurpassed in terms of national
importance. 
Subject to the de-minimus noted above, items donated or acquired are valued by the curators at point of acquisition; in
addition, there is a five year rolling programme of valuation to ensure all significant items in the Art collection are valued. 
All valuations are undertaken by the curators having relevant knowledge and experience and with reference to
appropriate commercial markets.
Art collection items are held in the Council balance sheet at market value and are tested annually for impairment, e.g.
where an item has suffered physical deterioration or breakage or where doubts arise as to its authenticity.  Any
impairment is recognised and measured in accordance with the Council’s general policies on impairment.
As the assets within the art collection are deemed to have indeterminate lives and a high residual value, the Council
does not consider it appropriate to charge depreciation.
History Collection
The History collection includes social history, archaeology, arms and armour, costume, archives, coins, medals and
stamps, photography and world cultures collections.  These items cannot be readily and/or reliably valued due to their
diverse nature.  The cost of valuation would be disproportionate in terms of any benefit derived to the user of the financial
statements and the History collection is consequently excluded from the Council Balance Sheet.
Natural History Collection
The Natural History collection includes zoology, botany and geology collections.  No market exists for these items and
collections and there is no comparable data to form the basis of valuation.  The cost of obtaining valuations would be
disproportionate in terms of any benefit derived to the user of the financial statements and Natural History collections are
consequently excluded from the Council Balance Sheet.  
34 | Perth and Kinross Council Annual Accounts 2023/24 Page 53 of 214

Page 54

35 | Perth and Kinross Council Annual Accounts 2023/24 
Heritage Assets – General
The Council may dispose of heritage assets which have a doubtful provenance or are unsuitable for public display.  The
proceeds of such items are accounted for in accordance with the Council’s general provisions relating to the disposal of
property, plant and equipment.  Disposal proceeds are disclosed separately in the notes to the financial statements and
are accounted for in accordance with statutory accounting requirements relating to capital expenditure and capital
receipts. 
The promotion of other cultural events and programmes during the year makes it difficult to reliably estimate the
percentage of the Art Collection on display for public viewing.  All items not on display are held in secure storage and
access is permitted to scholars and others for research purposes.
The Culture Perth and Kinross Collections Management Framework provides guidance on the collection, disposal or
lending of heritage assets.  
Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the Council as a result of
past events (e.g. software licences) is capitalised when it is expected that future economic benefits or service potential
will flow from the intangible asset to the Council.  Internally generated assets are capitalised where it is demonstrable
that the project is technically feasible and is intended to be completed (with adequate resources being available) and the
Council will be able to generate future economic benefits or deliver service potential by being able to sell or use the
asset.  Expenditure is capitalised where it can be measured reliably as attributable to the asset and restricted to that
incurred during the development phase (research expenditure is not capitalised).  Expenditure on the development of
websites is not capitalised if the website is solely or primarily intended to promote or advertise the Council’s goods or
services.
Intangible assets are measured initially at cost.  Amounts are only revalued where the fair value of the assets held by the
Council can be determined by reference to an active market.  The depreciable amount of an intangible asset is amortised
over its useful life to the relevant service line(s) in the Comprehensive Income and Expenditure Statement. 
An asset is tested for impairment whenever there is an indication that the asset might be impaired – any losses
recognised are posted to the relevant service line(s) in the Comprehensive Income and Expenditure Statement.  Any
gain or loss arising on the disposal or abandonment of an intangible asset is posted to the Other Operating Expenditure
line in the Comprehensive Income and Expenditure Statement.  Where expenditure on intangible assets qualifies as
capital expenditure for statutory purposes, amortisation, impairment losses and disposal gains and losses are not
permitted to have an impact on the General Fund Balance  To comply with these restrictions, the gain or loss on the
derecognition of an intangible fixed asset shall be reversed out of the General Fund or Housing Revenue Account.  The
General Fund or Housing Revenue Account shall be debited (in the case of the gain) or credited ( in the case of a loss)
with an amount equal to the gain or loss on derecognition of the intangible asset.  The gain or loss that is reversed out of
the General Fund or Housing Revenue Account excludes any costs of disposal that either cannot be capitalised under
regulation or statutory guidance or that the authority has chosen not to capitalise.  The double entries are a credit to the
capital receipts reserve or a capital grants and receipts unapplied account of an amount equal to the disposal proceeds
and a debit to the capital adjustment account equal to the carrying amount of the intangible asset.
Interests in Companies and Other Entities
The Council has material interests in companies and other entities that have the nature of subsidiaries, associates and
jointly controlled entities and require it to prepare group accounts.  
Inventories
Inventories are included in the Balance Sheet at the lower of cost and net realisable value.  Work in progress is valued at
the cost of direct materials and labour plus attributable overheads based on the normal level of activity less any
attributable losses.  
Investment Properties
Investment properties are those that are used solely to earn rentals and/or for capital appreciation.  The definition is not
met if the property is used in any way to facilitate the delivery of services or production of goods or is held for sale. 
Investment properties are measured initially at cost and subsequently at fair value, being the price that would be received
to sell such an asset in an orderly transaction between market participants at the measurement date.  Properties are not
depreciated but are revalued annually according to market conditions at the year-end.  Gains and losses on revaluation
are posted to the Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement.  The same treatment is applied to gains and losses on disposal.
Rentals received in relation to investment properties are credited to the Financing and Investment Income line and result
in a gain for the General Fund Balance.  However, revaluation and disposal gains and losses are not permitted by
statutory arrangements to have an impact on the General Fund Balance.  To comply with these restrictions, the gain or
loss on the derecognition of an intangible fixed asset shall be reversed out of the General Fund or Housing Revenue
Account.  The General Fund or Housing Revenue Account shall be debited (in the case of the gain) or credited ( in the
case of a loss) with an amount equal to the gain or loss on derecognition of the intangible asset.  The gain or loss that is
reversed out of the General Fund or Housing Revenue Account excludes any costs of disposal that either cannot be
capitalised under regulation or statutory guidance or that the authority has chosen not to capitalise.  The double entries
35 | Perth and Kinross Council Annual Accounts 2023/24 Page 54 of 214

Page 55

36 | Perth and Kinross Council Annual Accounts 2023/24 
are a credit to the capital receipts reserve or a capital grants and receipts unapplied account of an amount equal to the
disposal proceeds and a debit to the capital adjustment account equal to the carrying amount of the intangible asset.
Leases
Leases are classified as finance leases where the terms of the lease transfer substantially all the risks and rewards
incidental to ownership of the property, plant or equipment from the lessor to the lessee.  All other leases are classified
as operating leases.  Where a lease covers both land and buildings, the land and buildings elements are considered
separately for classification.  Arrangements that do not have the legal status of a lease but convey a right to use an asset
in return for payment are accounted for under this policy where fulfilment of the arrangement is dependent on the use of
specific assets.  The Council currently has no assets acquired under finance leases, nor any leased to third parties on a
finance lease.  Accounting policies for operating leases are set out below.
The Council as Lessee
Operating Leases - Rentals paid under operating leases are charged to the Comprehensive Income and Expenditure
Statement as an expense of the services benefitting from use of the leased property, plant or equipment.  Charges are
made on a straight-line basis over the life of the lease, even if this does not match the pattern of payments (e.g. there is
a rent-free period at the commencement of the lease).
The Council as Lessor
Operating Leases - Where the Council grants an operating lease over a property or an item of plant or equipment, the
asset is retained in the Balance Sheet.  Rental income is credited to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement.  Credits are made on a straight-line basis over the life of the lease,
even if this does not match the pattern of payments (e.g. there is a premium paid at the commencement of the lease). 
Initial direct costs incurred in negotiating and arranging the lease are added to the carrying amount of the relevant asset
and charged as an expense over the lease term on the same basis as rental income.  
Property, Plant and Equipment
Assets that have physical substance and are held for use in the production or supply of goods or services, for rental to
others or for administrative purposes and that are expected to be used during more than one financial year are classified
as Property, Plant and Equipment.
Recognition
Expenditure on the acquisition, creation or enhancement of Property, Plant and Equipment is capitalised on an accruals
basis, provided that it is probable that the future economic benefits or service potential associated with the item will flow
to the Council and the cost of the item can be measured reliably.  Expenditure that maintains but does not add to an
asset’s potential to deliver future economic benefits or service potential (e.g. repairs and maintenance) is charged as an
expense when it is incurred.  
Measurement
Assets are initially measured at cost, comprising:
• the purchase price;
• any costs attributable to bringing the asset to the location and condition necessary for it to be capable of operating
in the manner intended by management;
• the initial estimate of the costs of dismantling and removing the item and restoring the site on which it is located
where there is a legal or constructive obligation to do so.
The Council does not capitalise borrowing costs incurred whilst assets are under construction.  The cost of assets
acquired other than by purchase is deemed to be its fair value, unless the acquisition will not increase the cash flows of
the Council.  In the latter case, the cost of the acquisition is the carrying amount of the asset.
Donated assets are measured initially at fair value.  The difference between fair value and any consideration paid is
credited to the Taxation and Non-Specific Grant Income line of the Comprehensive Income and Expenditure Statement,
unless the donation has been made conditionally.  Until conditions are satisfied, the gain is held in the Donated Assets
Account.  Where gains are credited to the Comprehensive Income and Expenditure Statement, they are reversed out of
the General Fund Balance to the Capital Adjustment Account in the Movement in Reserves Statement.
Assets are then carried in the Balance Sheet using the following measurement bases:
• infrastructure and community assets  – depreciated historical cost;
• assets under construction – historical cost
• dwellings – current value, determined using the basis of existing use value for social housing (EUV-SH).  The
Council values these assets using the Beacon approach (Adjusted Vacant Possession)
• other land and buildings – current value based on existing use value (EUV) for operational assets where there is
an active market, or if there is no market based evidence of current value because of the specialist nature of the
asset and/or the asset is rarely sold, depreciated replacement cost (DRC) using the instant build approach;
36 | Perth and Kinross Council Annual Accounts 2023/24 Page 55 of 214

Page 56

37 | Perth and Kinross Council Annual Accounts 2023/24 
• surplus assets – the current value measurement base is fair value, estimated at highest and best use from a
market participant’s perspective;
• all other assets – current value, determined by the amount that would be paid for the asset in its existing use
(existing use value – EUV).
Assets included in the Balance Sheet at current value are reviewed sufficiently regularly to ensure that their carrying
amount is not materially different from their current value at the year-end, and subject to formal revaluation as a minimum
every five years.  Increases in valuations are matched by credits to the Revaluation Reserve to recognise unrealised
gains.  Exceptionally, gains might be credited to the surplus or deficit on the provision of services where they arise from
the reversal of a loss previously charged to a service.
Where decreases in value are identified, the revaluation loss is accounted for as follows:
• where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying amount of the
asset is written down against that balance (up to the amount of the accumulated gains);
• where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount of the asset is
written down against the relevant service line(s) in the Comprehensive Income and Expenditure Statement.
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007 only, the date of its formal
implementation.  Gains arising before that date have been consolidated into the Capital Adjustment Account.
Impairment
Assets are assessed at each year-end as to whether there is any indication that an asset may be impaired.  Where
indications exist and any possible differences are estimated to be material, the recoverable amount of the asset is
estimated and, where this is less than the carrying amount of the asset, an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for:
• where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the carrying amount of the
asset is written down against that balance (up to the amount of the accumulated gains);
• where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount of the asset is
written down against the relevant service line(s) in the Comprehensive Income and Expenditure Statement.
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service line(s) in the
Comprehensive Income and Expenditure Statement, up to the amount of the original loss, adjusted for depreciation that
would have been charged if the loss had not been recognised.
Disposals and Assets Held for Sale
When it becomes probable that the carrying amount of an asset will be recovered principally through a sale transaction
rather than through its continuing use, it is reclassified as an Asset Held for Sale.  The asset is revalued immediately
before reclassification and then carried at the lower of this amount and fair value less costs to sell.  Where there is a
subsequent decrease to fair value less costs to sell, the loss is posted to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement.  Gains in fair value are recognised only up to the amount of any
previously recognised losses.  Depreciation is not charged on Assets Held for Sale.  Assets that are to be abandoned or
scrapped are not reclassified as Assets Held for Sale.
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet (whether
Property, Plant and Equipment or Assets Held for Sale) is written off to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement as part of the gain or loss on disposal.  
Receipts from disposals (if any) are credited to the same line in the Comprehensive Income and Expenditure Statement
also as part of the gain or loss on disposal (i.e. netted off against the carrying value of the asset at the time of disposal). 
Any revaluation gains accumulated for the asset in the Revaluation Reserve are transferred to the Capital Adjustment
Account.
Amounts received for a disposal are categorised as capital receipts.  The balance of receipts is required to be credited to
the Capital Receipts Reserve, and can then only be used for new capital investment or set aside to reduce the Council’s
underlying need to borrow (the capital financing requirement).  Receipts are appropriated to the Reserve from the
General Fund Balance in the Movement in Reserves Statement.  The written-off value of disposals is not a charge
against council tax, as the cost of fixed assets is fully provided for under separate arrangements for capital financing.  
Amounts are appropriated to the Capital Adjustment Account from the General Fund Balance in the Movement in
Reserves Statement.  
37 | Perth and Kinross Council Annual Accounts 2023/24 Page 56 of 214

Page 57

38 | Perth and Kinross Council Annual Accounts 2023/24 
Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets by the systematic allocation of their depreciable
amounts over their useful lives.  An exception is made for assets without a determinable finite useful life (i.e. freehold
land and certain Community Assets) and assets that are not yet available for use (i.e. assets under construction).
Leasehold Properties over period of lease
Roads and Bridges 15-30 years
Other Infrastructure Assets 10-30 years
Vehicles, Plant and Equipment 3-15 years
Council Buildings up to 50 years
Council Dwellings 10-30 years
Intangible Fixed Assets 3-5 years
Where an item of Property, Plant and Equipment asset has major components whose cost is significant in relation to the
total cost of the item, the components are depreciated separately.  Revaluation gains are also depreciated, with an
amount equal to the difference between current value depreciation charged on assets and the depreciation that would
have been chargeable based on their historical cost being transferred each year from the Revaluation Reserve to the
General Fund.
Private Finance Initiative (PFI) and Similar Contracts
PFI and similar contracts are agreements to receive services, where the responsibility for making available the property,
plant and equipment needed to provide the services passes to the PFI contractor.  As the Council is deemed to control
the services that are provided under its PFI schemes the Council carries the assets used under the contracts on its
Balance Sheet as part of Property, Plant and Equipment.
The original recognition of these assets at fair value (based on the cost to purchase the property, plant and equipment)
was balanced by the recognition of a liability for amounts due to the scheme operator to pay for the capital investment. 
Non-current assets recognised on the Balance Sheet are revalued and depreciated in the same way as property, plant
and equipment owned by the Council.
The amounts payable to the PFI operators each year are analysed into five elements:
• fair value of the services received during the year – debited to the relevant service in the Comprehensive Income
and Expenditure Statement;
• finance cost – an interest charge on the outstanding Balance Sheet liability, debited to the Financing and
Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement;
• contingent rent – increases in the amount to be paid for the property arising during the contract, debited to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement;
• payment towards liability – applied to write down the Balance Sheet liability towards the PFI operator (the profile
of write-downs is calculated using the same principles as for a finance lease);
• lifecycle replacement costs – debited to the relevant service in the Comprehensive Income and Expenditure
Statement.
Provisions
The Council is required to make provisions where an event has taken place that gives the Council a legal or constructive
obligation that probably requires settlement by a transfer of economic benefits or service potential, and a reliable
estimate can be made of the amount of the obligation.  Provision has been made for bad and doubtful debts in respect of
Council Tax, Housing Rents and other items of income, where appropriate.  In all cases the level of provision is based on
experience and an assessment of the prospects of recovering the related debt.  
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income and Expenditure
Statement in the year that the council becomes aware of the obligation, and measured at the best estimate at the
balance sheet date of the expenditure required to settle the obligation, taking into account relevant risks and
uncertainties.  When payments are eventually made, they are charged to the provision carried in the Balance Sheet. 
Estimated settlements are reviewed at the end of each financial year – where it becomes less than probable that a
transfer of economic benefits will now be required (or a lower settlement than anticipated is made), the provision is
reversed and credited back to the relevant service.  Where some or all of the payment required to settle a provision is
expected to be recovered from another party (e.g. from an insurance claim), this is only recognised as income for the
relevant service if it is virtually certain that reimbursement will be received if the council settles the obligation.
Reserves
Reserves are created by appropriating amounts out of the General Fund Balance in the Movement in Reserves
Statement.  When expenditure to be financed from a reserve is incurred, it is charged to the appropriate service in that
year against the Surplus/Deficit on the Provision of Services in the Comprehensive Income and Expenditure Statement. 
The reserve is then appropriated back into the General Fund Balance in the Movement in Reserves Statement so that
there is no net charge against council tax for the expenditure.  Certain reserves are kept to manage the accounting
38 | Perth and Kinross Council Annual Accounts 2023/24 Page 57 of 214

Page 58

39 | Perth and Kinross Council Annual Accounts 2023/24 
processes for non-current assets, financial instruments and retirement benefits and that do not represent usable
resources for the Council – these reserves are explained in the relevant notes.
Revenue Expenditure Funded from Capital under Statute
Expenditure incurred during the year that may be capitalised under statutory provisions but does not result in the creation
of a non-current asset is charged as expenditure to the relevant Service in the Comprehensive Income and Expenditure
Statement in the year.  Where the Council has determined to meet the cost of this expenditure from existing capital
resources or by borrowing, a transfer in the Movement in Reserves Statement from the General Fund Balance to the
Capital Adjustment Account then reverses out the amounts charged so that there is no impact on the level of council tax.
VAT
VAT payable is included as an expense only to the extent that it is not recoverable from His Majesty’s Revenue and
Customs.  VAT receivable is excluded from income.
2. Accounting Standards that have been issued but have not been adopted
At the balance sheet date, the following new standards and amendments to existing standards have been published but not
yet adopted by The Code:
• Classification of Liabilities as Current or Non-current (Amendments to IAS 1) issued in January 2020.  The
amendments: 
• specify that an entity’s right to defer settlement must exist at the end of the reporting period
• clarify that classification is unaffected by management’s intentions or expectations about whether the entity will
exercise its right to defer settlement,
• clarify how lending conditions affect classification, and
• clarify requirements for classifying liabilities an entity will or may settle by issuing its own equity instruments.
• Lease Liability in a Sale and Leaseback (Amendments to IFRS 16) issued in September 2022.  The amendments
to IFRS 16 add subsequent measurement requirements for sale and leaseback transactions.
• Non-current Liabilities with Covenants (Amendments to IAS 1) issued in October 2022.  The amendments
improved the information an entity provides when its right to defer settlement of a liability for at least 12 months is
subject to compliance with covenants.  (Adopted 1 April 2024)
• International Tax Reform: Pillar Two Model Rules (Amendments to IAS 12) issued in May 2023.  Pillar Two
applies to multinational groups with a minimum level of turnover.  The amendments introduced:
• a temporary exception to the requirements to recognise and disclose information about deferred tax assets and
liabilities related to Pillar Two income taxes, and
• targeted disclosure requirements for affected entities.  (Adopted 1 April 2024)
• Supplier Finance Arrangements (Amendments to IAS 7 and IFRS 7) issued in May 2023.  The amendments
require an entity to provide additional disclosures about its supplier finance arrangements.  The IASB developed the
new requirements to provide users of financial statements with information to enable them to:
• assess how supplier finance arrangements affect an entity’s liabilities and cash flows, and
• understand the effect of supplier finance arrangements on an entity’s exposure to liquidity risk and how the entity
might be affected if the arrangements were no longer available to it.  This impact is not expected to be significant.
• IFRS 16 Leases will be implemented in the Code of Practice on Local Authority Accounting in the United Kingdom
(the Code) for 2024/25.  This will require the Council, with effect from 2024/25, to adopt this new accounting standard
for Leases, which replaces IAS 17 Leases and removes the operating classification for leases where the Council acts
as lessee.  The Council, as lessee, will recognise previously accounted for operating leases on the Balance Sheet as
Right-of-Use (ROU) assets along with the corresponding lease liabilities. 
Previously, the Council as lessee, had formally classified leases into either operating or finance leases, depending on
whether the lease met the criteria for transferring the majority of the risks and rewards relating to ownership
according to IAS 17. 
Under IFRS 16 the Council will recognise ROU assets and lease liabilities on the balance sheet for most leases,
subject to exemptions for short-term leases and those of a ‘low value’.  Leases that meet either of these exemptions
will not be recognised in accordance with exemption guidelines.  Leases considered to be short-term are those that
have a term of 12 months or less.  IFRS 16 does not provide a numerical threshold for what constitutes a low value
asset; however, the Council has adopted a value of £10,000 for this exemption.
IFRS 16 will be applied retrospectively to leases already in place, with the cumulative effect recognised at 1 April
2024.  The ROU asset and lease liabilities will be calculated as if IFRS 16 had previously been applied, but will only
be recognised from 2024/25 with no prior year adjustments.
It is anticipated that the adoption of the Code’s adaptation of IFRS 16 would result in the following additions to the
balance sheet as at 31 March 2024:
o £591,000   Property, Plant and Equipment (Right-of-Use Assets)
o £591,000   Lease Liabilities
39 | Perth and Kinross Council Annual Accounts 2023/24 Page 58 of 214

Page 59

40 | Perth and Kinross Council Annual Accounts 2023/24 
3. Critical Judgements in Applying Accounting Policies
In applying the accounting policies set out in Note 1, the Council has had to make certain judgements about complex
transactions or those involving uncertainty about future events.  The critical judgements made in the Annual Accounts are:
Group Entities
The Council has an interest in a number of subsidiary and associate companies and trusts.  The most significant of these
companies in terms of the size of trading operations, shareholding and board representation and other factors have been
assessed and where deemed material to the Council, are included in the Group Accounts.  Full details of these interests are
shown in Note 1 to the Group Accounts.
Leases
Leases are classified as finance leases where the terms of the lease transfer substantially all the risks and rewards
incidental to ownership of the property, plant or equipment from the lessor to the lessee.  The Council has determined that all
leased in sites are operating leases due to the short term nature of the agreements.  The Council also leases out sites which
predominately relate to ground leases for land which has an indeterminable life and these agreements are classified as
operating leases.  Note 1 to the Financial Statements provides further detail on the accounting treatment for the lease
agreements.
Public Sector Funding
There is a high degree of uncertainty about future levels of funding for local government.  However, the Council has
determined that this uncertainty is not yet sufficient to provide an indication that the assets of the Council might be impaired
as a result of a need to close facilities and reduce levels of service provision.
Public Private Partnership (PPP)
The Council is deemed to control the services provided under the agreement for the provision of educational establishments. 
The accounting policies for PPP schemes and similar arrangements have been applied and the assets under the contract
are included within Property, Plant and Equipment on the Council’s Balance Sheet.  Note 36 provides further details.
4. Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty
The Annual Accounts contain estimated figures that are based on assumptions made by the Council about the future or that
are otherwise uncertain.  Estimates are made taking into account historical experience, current trends and other relevant
factors.  However, because balances cannot be determined with certainty, actual results could be materially different from
the assumptions and estimates.
The item in the Council’s Balance Sheet at 31 March 2024 for which there is a significant risk of material adjustment in the
forthcoming financial year are in respect of the Council’s Net Pensions Asset / Liability and valuation of Property, Plant and
Equipment.
Net Pension Liability
Uncertainty
Estimation of the net liability to pay pensions depends on a number of complex judgements relating to the discount rate
used, the rate at which salaries are projected to increase, changes in retirement ages, mortality rates and expected
returns on pension fund assets.  This is further detailed in Note 18 to the Accounts which includes a table setting out the
potential sensitivity of change in assumptions on the Pension Liability.  A firm of consulting actuaries is engaged to
provide the Council with expert advice about the assumptions to be applied.  
Effect if Actual Results Differ from Assumptions
The effects on the net pension asset / liability of changes in individual assumptions can be measured.  For instance, a
0.1% increase in the discount rate assumption would result in a reduction in the pension liability of £13.738 million. 
However, the assumptions interact in complex ways and the pension asset had increased from £250.276 million in
2022/23 to £320.913 million in 2023/24.  However, by applying IAS 19 and the asset ceiling provision contained therein,
the Council has actually recognised a pension liability of £20.748 million in 2023/24 (£20.917 million in 2022/23). 
Property, Plant and Equipment - Valuations
Uncertainty
Although markets are functioning and transaction volumes are at levels where there is sufficient evidence on which to
base opinions on value, there remain uncertainties due to worldwide events which continue to influence pricing.
The valuation reports provided by Royal Institution of Chartered Surveyors (RICS) valuers have been used to inform the
measurement of non-current assets in these financial statements. 
40 | Perth and Kinross Council Annual Accounts 2023/24 Page 59 of 214

Page 60

41 | Perth and Kinross Council Annual Accounts 2023/24 
Specialised assets such as educational buildings are valued on the basis of depreciated replacement cost.  Here the
valuer bases their assessment on the cost to the Council of replacing the service potential of the assets; the uncertainty
relates to the estimated costs of, rather than the extent of, service potential to be replaced. 
The valuer has provided estimates for the range of uncertainty attached to the valuation of Council dwellings.  The
valuation of Council dwellings requires the use of an Adjustment Factor which is applied to the vacant possession value
of the housing stock to arrive at the reported Existing Use Value – Social Housing (EUV-SH).  The Adjustment Factor is
based on the ratio of private and public sector rents and yields.  Rental ratios are established from data provided by the
Council and from Local Housing Allowances, HM Rent Service, RICS, and using information on private sector rents from
research including local letting agents.  Information on yields is derived from the RICS, Building Society and Chartered
Surveyor firm publications, and government publications.
Effect if Actual Results Differ from Assumptions
A sensitivity analysis has been undertaken in respect of all properties valued on a depreciated replacement cost basis to
determine the potential movement in value due to changes in price estimates.  The sensitivity analysis includes several
assumptions, including that the Gross Internal Area (GIA) of each site remains unchanged, and the building use and
condition remains in line with the previous valuation.  The estimated movement in value at 31 March 2024 is £20.924m. 
However, the estimate includes two PFI Community Campuses which were revalued in 2023/24 and for which the BCIS
reference rate has increased by 27% during the year.  The estimated increase in value for the two sites is £17.855m.  As
other BCIS rates for educational properties had increased by circa 2%, it is reasonable to conclude that the BCIS
reference rate for the two campuses is therefore highly variable and so no adjustment has been made to the value of the
two sites.  The remaining estimated movement of £3.069m for 140 sites is not material and has therefore also not been
adjusted. 
A sensitivity analysis on the Council housing revaluation has been undertaken by the valuer to examine the potential
impact if the Adjustment Factor was increased or decreased by 5%, this being the tolerance listed within the valuation
guidance published by the Ministry for Housing Communities and Local Government (MHCLG).  The EUV–SH for the
Council housing stock at 31 March 2024 is £318.678 million.  A 5% increase or decrease to the Adjustment Factor would
result in an increase or decrease of £40.004 million (12.55%) to the value of the Council housing stock.  
41 | Perth and Kinross Council Annual Accounts 2023/24 Page 60 of 214

Page 61

42 | Perth and Kinross Council Annual Accounts 2023/24 
5. Adjustments between Accounting Basis and Funding Basis under Regulations
General Housing Capital Capital Total 2022/23
Fund Revenue Receipts Grants
Balance Account Reserve Unapplied
£'000 £'000 £'000 £'000 £'000 £'000
Adjustments involving the Capital Adjustment Account
Depreciation and impairment on non-current assets (42,520) (14,316) 0 0 (56,836) (47,835)
Revaluation Losses on Property, Plant and Equipment (34,562) (2,789) 0 0 (37,351) (2,084)
Reversal revaluation gains 3,729 199 0 0 3,928 13,271
Movements in Fair Value of Investment Properties (300) 0 0 0 (300) 955
Amortisation of Intangible Assets (949) 0 0 0 (949) (1,026)
Capital grants and contributions credited to the
Comprehensive Income and Expenditure Statement 42,642 3,787 0 0 46,429 42,656
Amounts of non current assets written off on disposal
as part of the gain/loss (1,322) 0 0 0 (1,322) (1,523)
Revenue Expenditure Funded by Capital Under Statute (3,770) 0 0 0 (3,770) (838)
Items not debited or credited to the Comprehensive
Income and Expenditure Statement
Statutory provision for repayment of debt 11,812 3,448 0 0 15,260 15,690
Capital expenditure charged to the General Fund and
HRA balances 2,399 2,335 0 0 4,734 6,391
Adjustments involving the Capital Receipts Reserve
Transfer of sale proceeds credited as part of the
gain/loss on disposal 1,837 3 (1,840) 0 0 0
Use of the Capital Receipts Reserve to finance new
capital expenditure 0 0 1,983 0 1,983 1,360
Adjustments involving the Financial Instruments
Adjustment Account 497 147 0 0 644 648
Adjustments involving the Pensions Reserve
Employer's pensions contributions and direct
payments to pensioners payable in the year 21,287 1,479 0 0 22,766 20,912
Reversal of items relating to retirement benefits
debited or credited to the Comprehensive Income and
Expenditure Statement (20,923) (1,478) 0 0 (22,401) (48,260)
Adjustments involving Short Term Accumulated
Absences Account
Amount by which officer remuneration charged to the
Comprehensive Income and Expenditure Statement on
an accruals basis is different from remuneration
chargeable in the year in accordance with statutory
requirements 310 28 0 0 338 (521)
Total Adjustments (19,833) (7,157) 143 0 (26,847) (204)
Usable Reserves
42 | Perth and Kinross Council Annual Accounts 2023/24 Page 61 of 214

Page 62

6. Expenditure and Funding Analysis - 2023/24
Net
Net Expenditure
Expenditure Adjustments in the
charged to between the Comprehensive
the General Funding and Income and
Fund and HRA Accounting Expenditure
Balances Basis Statement
£000 £000 £000
Education and Children's Services 200,653 35,484 236,137
Health and Social Care 87,613 1,029 88,642
Communities 66,825 44,138 110,963
Corporate and Democratic Services 36,229 3,436 39,665
Chief Executives Service 4,569 82 4,651
Housing Revenue Account (6,985) 16,967 9,982
Valuation Joint Board 1,436 0 1,436
Non Distributed Costs 1,757 (1,757) 0
Cost of Services 392,097 99,379 491,476
Other Income and Expenditure (376,605) (63,578) (440,183)
Deficit on Provision of Services 15,492 35,801 51,293
Opening General Fund and HRA Balance (72,370)
Surplus on General Fund and HRA Balance in Year 15,492
Transfers from other Statutory Reserves 5,086
Service concession flexibility (34,262)
Closing General Fund and HRA Balance at 31 March 2024 (86,054)
This note provides a reconciliation of the main adjustments to Net Expenditure Chargeable to the General Fund and HRA Balances to
arrive at the amounts in the Comprehensive Income and Expenditure Statement. The relevant transfers between Reserves are explained
in the Movement in Reserves Statement.
Notes to the Expenditure and Funding Analysis - adjustments between funding and accounting basis
Note A Note B Note C
£ '000 £ '000 £ '000 £ '000
COUNCIL SERVICES
Education and Children's Services 34,851 773 (140) 35,484
Health and Social Care 589 500 (60) 1,029
Communities 43,571 624 (57) 44,138
Corporate and Democratic Services 3,118 415 (97) 3,436
Chief Executives Service 0 40 42 82
Housing Revenue Account 16,928 67 (28) 16,967
Non Distributed Costs 0 (1,757) 0 (1,757)
Cost of Services 99,057 662 (340) 99,379
Other Operating Expenditure and Income (518) 0 0 (518)
Financing and Investment Income and Expenditure (14,960) (1,027) (644) (16,631)
Taxation and Non-Specific Grant Income (46,429) 0 0 (46,429)
Other income and expenditure from the Expenditure and Funding
Analysis (61,907) (1,027) (644) (63,578)
Difference between General Fund surplus or deficit and
Comprehensive Income and Expenditure Statement Surplus or
Deficit on the Provision of Services
37,150 (365) (984) 35,801
Adjustments from General Fund to arrive at the Comprehensive
Income and Expenditure Statement amounts
Adjustments for
Capital Purposes
Net change for the
Pensions
Adjustments Other Differences Total Adjustments
43 | Perth and Kinross Council Annual Accounts 2023/24 Page 62 of 214

Page 63

Net
Net Expenditure
Expenditure Adjustments in the
charged to between the Comprehensive
the General Funding and Income and
Fund and HRA Accounting Expenditure
Balances Basis Statement
£000 £000 £000
Education and Children's Services 191,577 12,766 204,343
Health and Social Care 82,433 5,881 88,314
Communities 61,769 26,524 88,293
Corporate and Democratic Services 35,469 9,416 44,885
Chief Executives Service 2,498 396 2,894
Housing Revenue Account (7,064) 12,513 5,449
Valuation Joint Board 1,338 0 1,338
Non Distributed Costs 1,540 (1,540) 0
Cost of Services 369,560 65,956 435,516
Other Income and Expenditure (354,214) (58,033) (412,247)
Deficit on Provision of Services 15,346 7,923 23,269
Opening General Fund and HRA Balance (89,182)
Surplus on General Fund and HRA Balance in Year 15,346
Transfers to other Statutory Reserves 1,466
Closing General Fund and HRA Balance at 31 March 2023 (72,370)
This note provides a reconciliation of the main adjustments to Net Expenditure Chargeable to the General Fund and HRA Balances to
arrive at the amounts in the Comprehensive Income and Expenditure Statement. The relevant transfers between Reserves are explained
in the Movement in Reserves Statement.
Notes to the Expenditure and Funding Analysis - adjustments between funding and accounting basis
Note A Note B Note C
£ '000 £ '000 £ '000 £ '000
COUNCIL SERVICES
Education and Children's Services 2,560 9,701 505 12,766
Health and Social Care 1,011 4,779 91 5,881
Communities 19,901 6,716 (93) 26,524
Corporate and Democratic Services 5,182 4,256 (22) 9,416
Chief Executives Service (2) 375 23 396
Housing Revenue Account 10,878 1,619 16 12,513
Non Distributed Costs 0 (1,540) 0 (1,540)
Cost of Services 39,530 25,906 520 65,956
Other Operating Expenditure and Income 474 0 0 474
Financing and Investment Income and Expenditure (16,645) 1,442 (648) (15,851)
Taxation and Non-Specific Grant Income (42,656) 0 0 (42,656)
Other income and expenditure from the Expenditure and Funding
Analysis (58,827) 1,442 (648) (58,033)
Difference between General Fund surplus or deficit and
Comprehensive Income and Expenditure Statement Surplus or
Deficit on the Provision of Services
(19,297) 27,348 (128) 7,923
Total Adjustments
Expenditure and Funding Analysis - 2022/23
Adjustments from General Fund to arrive at the Comprehensive Income
and Expenditure Statement amounts
Adjustments for
Capital Purposes
Net change for the
Pensions
Adjustments Other Differences
44 | Perth and Kinross Council Annual Accounts 2023/24 Page 63 of 214

Page 64

45 | Perth and Kinross Council Annual Accounts 2023/24 
Note 6 cont’d
Explanation to the Expenditure and Funding Analysis
Adjustments for Capital Purposes 
Note A  Adjustments for Capital Purposes adds in depreciation and impairment and revaluation gains and
losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal
of assets and the amounts written off for those assets.
• Financing and investment income and expenditure – the statutory charges for capital
financing and other revenue contributions are deducted from other income and expenditure as
these are not chargeable under generally accepted accounting practices.
• Taxation and non-specific grant income and expenditure – capital grants are adjusted for
income not chargeable under generally accepted accounting practices.  Revenue grants are
adjusted from that receivable in the year to that receivable without conditions or for which
conditions were satisfied throughout the year.  The Taxation and Non Specific Grant Income and
Expenditure line is credited with capital grants receivable in the year without conditions or for
conditions which were satisfied in the year.
Net Change for the Pensions Adjustments
Note B  Net change for the removal of pension contributions and the addition of IAS 19 Employee Benefits
pension related expenditure and income:
• For services – this represents the removal of the employer pension contributions made by the
authority as allowed by statute and the replacement with current service costs and past service
costs.
• For Financing and investment income and expenditure – the net interest on the defined
benefit liability is charged to the Comprehensive Income and Expenditure Statement.
Other Differences
Note C  Other differences between the amounts debited/credited to the Comprehensive Income and
Expenditure Statement and amounts payable/receivable to be recognised under statute:
• For services – this represents the removal of the increase or decrease in the employee statutory
adjustment account.
• For Financing and investment income and expenditure – the other differences column
recognises adjustments to the General Fund for the timing differences for premiums and
discounts and stepped interest rate loans.  
45 | Perth and Kinross Council Annual Accounts 2023/24 Page 64 of 214

Page 65

46 | Perth and Kinross Council Annual Accounts 2023/24 
7. Transfer (to)/from Earmarked Reserves
The Reserves Strategy that the Council approved in February 2024 earmarked funding towards specific or known future
commitments.  The following table sets out the updated balances as at 31 March 2024 for these Earmarked Reserves taking
cognisance of the final year-end position.  
Balance as at Transfers Balance as at
1 April 2023 (In)/Out) 31 March 2024
£'000 £'000 £'000
Revenue Grants (15,947) (1,390) (17,337)
Service concession flexibility 0 (17,262) (17,262)
Transformation and Workforce Management (9,530) 1,924 (7,606)
Developer Contributions: Commuted Sums and
Infrastructure and Affordable Housing (5,540) (915) (6,455)
Affordable Housing (Resources accrued from
reduced Council Tax Discounts) (4,353) (1,256) (5,609)
School Estate (2,063) (101) (2,164)
Anti-Poverty Measures (2,666) 806 (1,860)
Non-Recurring Pressures c/f from 2023/24 0 (1,635) (1,635)
Car Parking (1,512) (20) (1,532)
Culture (1,172) 315 (857)
Devolved School Management (DSM) (722) 221 (501)
Modern Apprentices/Graduate Trainees (340) (27) (367)
School Counsellors (556) 227 (329)
Children and Young People's Residential Care (2,139) 1,858 (281)
Property Maintenance (271) 9 (262)
Climate Change (153) (52) (205)
Works Maintenance (400) 200 (200)
Community Resilience 0 (175) (175)
Salix Fund (113) 11 (102)
Community Investment Fund (89) 2 (87)
Ventilation Measures (114) 38 (76)
Perth Leisure Vision (212) 150 (62)
Local Government Elections 0 (53) (53)
Local Action Partnerships (90) 44 (46)
Financial Assistance 0 (20) (20)
Non-Recurring Pressures c/f from 2022/23 (1,699) 1,699 0
Decant schools (700) 700 0
Financial Insecurity (680) 680 0
Perth and Kinross Offer (252) 252 0
World Cycling Championships (180) 180 0
Grounds Maintenance (60) 60 0
Earmarked Balances (51,553) (13,530) (65,083)
Purpose of Earmarked General Fund Balances
The application and monitoring of the following reserves is part of the remit of the Finance and Resources Committee.
Revenue Grants – these grants are being carried forward in reserves as the grant conditions have been met but the
expenditure has not been fully incurred.
Service Concession flexibility – these resources are earmarked to be phased over a number of years to contribute to the
funding of the Revenue Budget.
Transformation and Workforce Management – the Council has resources earmarked to enable the Transformation and
Change Strategy and workforce management in future years.
Developer Contributions: Commuted Sums and Infrastructure and Affordable Housing – the Environment,
Infrastructure and Economic Development Committee approved supplementary guidance on 20 September 2023 for
developer contributions covering community greenspace, primary education, Auchterarder A9 junction improvements,
affordable housing and transport infrastructure.  These sums are held in the Council’s Reserves until they are applied to
relevant schemes.  
Affordable Housing (Resources accrued from reduced Council Tax Discounts) – these reserves have been generated
as a result of the Council’s policy on varying the level of council tax charged for long term empty properties and second
homes.  These resources can only be used for the provision of affordable housing.  
School Estate – These resources include amounts previously approved by the Council for the primary and secondary
school estate including maintenance works and resources for new schools. 
46 | Perth and Kinross Council Annual Accounts 2023/24 Page 65 of 214

Page 66

47 | Perth and Kinross Council Annual Accounts 2023/24 
Anti-Poverty measures – The Council approved the creation of a COVID-19 Reserve on 27 January 2021 (Report 21/8
refers) to assist with addressing the ongoing impact of Covid-19 in future years.  This has now been redirected towards Anti-
Poverty measures.
Non-Recurring Pressures c/f from 2023/24 – the 2024/25 Revenue Budget includes non-recurring expenditure proposals
which have been approved during the year at Finance and Resources Committee and as part of the year end process.
Car Parking – this balance is the accumulated surplus at 31 March 2024 which is restricted in its application under the Road
Traffic Regulation Act 1984.  Any proposals to utilise these resources will require approval by the Finance and Resources
Committee.
Culture – there was £363,000 approved for developing the cultural offer from the final under spend in the 2018/19 Revenue
Budget and reported to Strategic Policy and Resources Committee during the year.  This has been further increased by in-
year underspends.  
Devolved School Management (DSM) – the amount shown is the accumulated sum available to be carried forward at 31
March 2024 under the approved scheme for managing these budgets.  The purposes for which the earmarked amount can
be used and the procedures for its management and control are detailed in the Council’s approved DSM scheme.
Modern Apprentices/Graduate Trainees – the Strategic Policy and Resources Committee approved the transfer of any
final under spend on modern apprentices and graduate trainees.  The remaining resources will be utilised in future years.
School Counsellors – Revenue Budget 2020/21 Update No 2 to the Strategic Policy and Resources Committee approved
the earmarking of resources received from the Scottish Government in respect of counselling in schools which are
anticipated to be spent during 2024/25 and 2025/26 (Report 20/225).
Children and Young People’s Residential Care – These resources were earmarked to be utilised in the provision of
children’s social work services over 2 financial years in managing the impact of Covid-19 on higher levels of needs and
reduce the number of residential placements.  The balance of these resources will be utilised in 2024/25. 
Property Maintenance – Revenue Budget Report No 3 to the Strategic Policy and Resources Committee on 21 November
2021 approved the earmarking of £250,000 resources in respect of property maintenance to be utilised in future years.  This
was increased by a further £55,000 in 2021/22.
Climate Change – the Finance and Resources Committee in April 2023 approved the earmarking of resources for climate
change activities due to a rephasing between years. 
Works Maintenance – The Council continues to earmark resources for future works maintenance.  
Community Resilience – These resources were earmarked during 2023/24 at the Finance and Resources Committee for
future weather events.
Salix Fund – Salix Finance Ltd is a Government owned non-departmental public body which provides interest free loan
funding for energy efficiency works.  The loan is re-paid to the fund over a number of years and re-invested in future energy
efficiency works.
Community Investment Fund – The Council continues to earmark the resources remaining from the fund for future
investment.
Ventilation Measures – these resources are earmarked for ventilation measures to be finalised in 2024/25.
Perth Leisure Vision – these resources are earmarked to fund the future design and business operating model of the
PH2O project.
Local Government Elections – these resources are earmarked in reserves as a contribution to local elections.  
Local Action Partnership – these resources are earmarked and utilised by an application process for payment to groups in
one of the seven local action partnerships.
Financial Assistance – There is a recurring annual contribution from reserves to fund any future Mods and other events
across Perth and Kinross.
The remaining earmarked reserves detailed in the table were fully utilised or un-earmarked during 2023/24.
8. Other Operating Expenditure / Income
2023/24 2022/23
£'000 £'000
Losses and (Gains) on the Disposal of Non Current Assets (518) 474
Share of Tayside Contracts Surplus (426) (331)
Total (944) 143
9. Financing and Investment Income and Expenditure
2023/24 2022/23
£'000 £'000
Interest payable and similar charges 25,450 25,040
Pensions interest cost and expected return on pensions assets (1,027) 1,442
Interest receivable and similar income (5,065) (4,418)
Income in relation to investment properties and changes in their fair value (549) (1,755)
Total 18,809 20,309
47 | Perth and Kinross Council Annual Accounts 2023/24 Page 66 of 214

Page 67

48 | Perth and Kinross Council Annual Accounts 2023/24 
10. Taxation and Non Specific Grant Income
2023/24 2022/23
£'000 £'000
Council Tax Income (97,348) (92,860)
Non Domestic Rates (59,290) (45,917)
Non Ring-fenced Government Grants (254,981) (251,266)
Capital Grants and Contributions (46,429) (42,656)
Total (458,048) (432,699)
11. Material Items of Income and Expense
In 2023/24 the Council did not receive any material items of income not otherwise disclosed in the financial statements and
notes.  In 2022/23 the Council received additional grant funding of £8.669 million from the Scottish and UK Governments in
relation to the Covid-19 pandemic and Cost of Living Crisis which was treated as agency income and expenditure and does
not impact upon the figures in the Comprehensive Income and Expenditure Statement (see Note 15 for further details).  
12. Premiums and Discounts on Debt Rescheduling Written Down
The Code requires that any premiums or discounts arising from debt rescheduling should be written off in the year they were
incurred, except in limited circumstances where they would qualify as a ‘modification’ of debt.  During 2023/24, there were no
such debt modifications. 
The net amount of premium and discount debited to the General Fund and HRA, including for transactions prior to 1 April
2007 (as permitted by statutory guidance), from the Financial Instruments Adjustment Account was £623,000 (2022/23
£628,000).  
48 | Perth and Kinross Council Annual Accounts 2023/24 Page 67 of 214

Page 68

49 | Perth and Kinross Council Annual Accounts 2023/24 
13. General Grants, Bequests and Donations
Perth and Kinross Council is represented on, exercises influence over and provides grants to a large number of outside
bodies which provide services to the public, consistent with the Council’s statutory responsibilities.
During 2023/24 a total of £21.435 million (2022/23 £19.381 million) was paid out in support of these organisations ranging
from remission of hall rents of a few pounds to the contribution towards the operational and other costs of Live Active Leisure
Limited of £4.931 million (2022/23 £4.815 million).  Details of grants are shown below.
2023/24 2022/23
£'000 £'000
Service Level Agreements with Outside Organisations 7,827 4,762
Live Active Leisure Limited 4,931 4,815
Culture Perth and Kinross 3,392 3,219
Perth Theatre and Concert Hall Ltd 1,142 1,062
Green Capital Recovery Fund 456 465
Perth Money Advice Service 413 413
Community Investment Fund 402 355
Commercial Property Regeneration Grants 275 644
Churches Action for the Homeless 267 317
Warm Spaces Grant 248 420
Local Action Partnerships 244 16
Pitlochry Festival Theatre 220 220
Perthshire Women's Aid 108 108
Perth and Kinross Heritage Trust 100 100
Perth and Kinross Countryside Trust 100 30
Other Miscellaneous Grants 1,310 2,435
Total 21,435 19,381
14. Expenditure and Income Analysed by Nature
The Council’s expenditure and income is analysed as follows:
2023/24 2022/23
Expenditure / Income £'000 £'000
Expenditure
Employee benefits expenses 261,470 266,859
Other services expenses 279,137 268,070
Contribution to Integrated Joint Board 83,241 79,034
Support service recharges 3,477 3,346
Depreciation, amortisation, impairment 100,019 45,082
Interest payments 25,450 25,040
Loss on the disposal of assets 0 474
Total Expenditure 752,794 687,905
Income
Fees, charges and other service income 177,441 165,913
Interest and investment income 7,002 6,276
Taxation and Non-Specific Grant income 458,048 432,699
Government grants and contributions 58,492 59,748
Gain on the disposal of assets 518 0
Total Income 701,501 664,636
Deficit on the Provision of Services 51,293 23,269
49 | Perth and Kinross Council Annual Accounts 2023/24 Page 68 of 214

Page 69

50 | Perth and Kinross Council Annual Accounts 2023/24 
15. Agency Services
Agency arrangements operate in some Services where the Council undertakes work on behalf of other local authorities;
Scottish Water; government; and other public bodies.  The main items of income and related expenditure are shown below.
2023/24 2023/24 2022/23 2022/23
Income Expenditure Income Expenditure
£'000 £'000 £'000 £'000
Education and Children's Services
Provision of Pupil Support Assistants to other Local
Authorities 273 273 183 183
Communities
Receipts from other Local Authorities for cross
boundary bus services 25 25 18 18
Total 298 298 201 201
2023/24 2023/24 2022/23 2022/23
Income Expenditure Income Expenditure
£'000 £'000 £'000 £'000
Corporate and Democratic Services
Covid-related and Cost of Living-related Grants to
Individuals on behalf of Scottish and UK Governments 159 159 8,654 8,654
Communities
Hospitality and Leisure Top-up Funding 0 0 15 15
Total 159 159 8,669 8,669
The Council issued Covid-related and Cost of Living-related grants on behalf of both the Scottish and UK
Governments during 2023/24 to the value of £159,000 (£8.669 million in 2022/23) as detailed below.
The Council also received £534,000 (£445,000 in 2022/23) in relation to the administration of collecting Scottish
Water income on their behalf.  This has been recognised in the Comprehensive Income and Expenditure Statement.
16. External Audit Costs
2023/24 2022/23
£'000 £'000
External Audit Fees 350 330
17. Termination Benefits
The Council terminated the contracts of twenty-five employees in 2023/24, incurring costs of £1.511 million (eight employees
in 2022/23, incurring costs of £68,000).  
50 | Perth and Kinross Council Annual Accounts 2023/24 Page 69 of 214

Page 70

51 | Perth and Kinross Council Annual Accounts 2023/24 
18. Post-Employment Benefits
International Accounting Standard 19 ‘Employee Benefits’ (IAS 19) prescribes how pension costs and liabilities are to be
disclosed in the financial statements.  The standard requires employing organisations to account for post-employment
benefits in the period in which they are committed to give them, even if the actual payment of these benefits will be many
years in the future.  The following notes are prepared in accordance with the code guidance on disclosure requirements in
respect of IAS 19. 
Perth and Kinross Council participates in two different pension schemes, one for teaching staff and a separate scheme for all
other employees.
Pensions Schemes Accounted for as Defined Contribution Schemes
Teachers
Teachers employed by the Council are members of the Teachers’ Pension Scheme, administered by the Scottish
Government.  The Scheme provides teachers with specified benefits upon their retirement, and the Council contributes
towards the costs by making contributions based on a percentage of members’ pensionable salaries.  
The scheme is technically a defined benefit scheme.  However, the Scheme is unfunded and the Scottish Government uses
a notional fund as the basis for calculating the employers’ contribution rate paid by local authorities.  The Council is not able
to identify its share of the underlying financial position and performance of the scheme with sufficient reliability for accounting
purposes.  For the purposes of the Annual Accounts, it is therefore accounted for on the same basis as a defined
contribution scheme.
In 2023/24, the Council paid £16.725 million to the Teachers’ Pensions scheme in respect of teachers’ retirement benefits,
representing 23% of pensionable pay.  The figures for 2022/23 were £15.666 million and 23%.  There were no contributions
remaining payable at the year-end.  Additional payments relating to added year’s benefits, which the Council has inherited
from predecessor authorities or awarded itself, together with related increases, amounted to £189,391 (2022/23 £173,836).
Pension Schemes Accounted for as Defined Benefit Pension Schemes
Local Government Pension Scheme
The post-employment scheme for other employees, subject to certain qualifying criteria, is the Local Government Pension
Scheme (LGPS) which is administered in this area by Dundee City Council in respect of all local authorities and admitted
bodies in the former Tayside area.  This is a multi-employer scheme in which it is possible for an employer to identify its
share of the assets and liabilities on a consistent and reasonable basis.  Employer’s liabilities can be evaluated directly by
the Actuary at any time on membership data.
Benefits
• It is a Career Average Revalued Earnings scheme, meaning that the Council and employees pay contributions into a
fund, calculated at a level to balance the pension’s liability with investment assets.
• The pension’s accrual rate guarantees a pension based on 1/49th of career average revalued earnings and years of
pensionable service.  There is no automatic entitlement to a lump sum.  Members may opt to give up (commute)
pension for lump sum up to the limit set by the Finance Act 2004.  Pensions are increased annually in line with
changes to the Pensions (Increases) Act 1971 and Section 59 of the Social Security Pensions Act 1975.
Governance
• The Tayside Pension Fund is operated under the regulatory framework for the LGPS in Scotland and the governance
of the scheme is the responsibility of the Tayside Pension Fund Committee.  This Committee is comprised solely of
elected members of Dundee City Council.  Employing authorities (including Perth and Kinross Council) are
represented at the Tayside Pension Board.  
• Policy is determined in accordance with the Local Government Pension Scheme (Scotland) Regulations. 
Management of the Fund’s investments is carried out by the Fund’s Investment Advisory Panel which selects and
appoints a number of external investment managers/partners and monitors their investment performance.
• Under the Regulations, employers fall into three categories, scheme employers (also known as scheduled bodies)
such as Perth and Kinross Council, community admission bodies and transferee admission bodies.  Admission
agreements are generally assumed to be open-ended.  However, either party can voluntarily terminate the admission
agreement by giving an appropriate period of notice to the other parties.  Any deficit arising from the cessation
valuation will usually be levied on the departing admission body as a capital payment.
Principal Risks
• The principal risks to the scheme are the longevity assumptions, statutory changes to the scheme, changes to
inflation, bond yields and the performance of the investments held by the scheme.  These are mitigated to a certain
extent by the statutory requirements to charge the General Fund the amount due by statute as described in the
accounting policy note.
51 | Perth and Kinross Council Annual Accounts 2023/24 Page 70 of 214

Page 71

52 | Perth and Kinross Council Annual Accounts 2023/24 
Discretionary Post-employment Benefits
• Discretionary post-retirement benefits on early retirements are an unfunded defined benefit arrangement, under
which liabilities are recognised when an award is made.  There are no plan assets built up to meet these pension
liabilities.
The contributions paid into the scheme by employees and member pension benefits are prescribed, for the period to which
the accounts relate, by the Local Government Pensions Scheme (Scotland) Regulations 1998 as amended.  Perth and
Kinross Council’s contributions, as an employer, into the Tayside Pension Fund are subject to the advice of the Fund actuary.
The Local Government Pension Scheme allows for the award of discretionary post-employment benefits upon early
retirement.  This is an unfunded defined benefit final arrangement, under which liabilities are recognised when awards are
made.  However, there are no investment assets built up to meet the pension’s liabilities, and cash has to be generated to
meet actual pension’s payments as they eventually fall due.
Guaranteed Minimum Pension (GMP) Equalisation 
As a result of the High Court’s Lloyds ruling on the equalisation of GMPs between genders, a number of pension schemes
have made adjustments to accounting disclosures to reflect the effect this ruling has on the value of pension liabilities.  It is
our understanding that HM Treasury has confirmed that the judgement "does not impact on the current method used to
achieve equalisation and indexation in public service pension schemes". 
On 23 March 2021, the Government published the outcome to its Guaranteed Minimum Pension Indexation consultation,
concluding that all public service pension schemes, including the LGPS, will be directed to provide full indexation to
members with a GMP reaching State Pension Age (SPA) beyond 5 April 2021.  This is a permanent extension of the existing
‘interim solution’ that has applied to members with a GMP reaching SPA on or after 6 April 2016.
The Council’s valuation assumption for GMP is that the Fund will pay limited increases for members that have reached SPA
by 6 April 2016, with the Government providing the remainder of the inflationary increase.  For members that reach SPA after
this date, the Council has assumed that the Fund will be required to pay the entire inflationary increase.  This assumption is
consistent with the consultation outcome and the actuaries do not believe that it is necessary to make any adjustments to
the value placed on the liabilities as a result of the above outcome.
Career Average Revalued Earnings Scheme (CARE)
The Local Government Pension Scheme changed from Final Salary to Career Average Revalued Earnings (CARE) on 1
April 2015, with a change of accrual rate from 1/60th to 1/49th.  Employees who were previously paying into the Final Salary
scheme were automatically transferred into the new CARE scheme on 1 April 2015.  
Transactions Relating to Post-Employment Benefits
The Council recognises the cost of retirement benefits in the reported cost of services when they are earned by employees,
rather than when the benefits are eventually paid as pensions.  However, the charge the Council is required to make against
Council Tax is based on the cash payable in the year, so the real cost of post-employment/retirement benefits is reversed out
of the General Fund via the Movement in Reserves Statement.  
The following transactions have been made in the Comprehensive Income and Expenditure Statement and the General
Fund Balance via the Movement in Reserves Statement during the year.
52 | Perth and Kinross Council Annual Accounts 2023/24 Page 71 of 214

Page 72

53 | Perth and Kinross Council Annual Accounts 2023/24 
Local Government Pension Scheme 2023/24 2022/23
£'000 £'000
Comprehensive Income and Expenditure Statement
Cost of Services
- Service Cost 23,428 46,818
Financing and Investment Income and Expenditure
- Net Interest on the Defined Liability (1,326) 1,186
Administration Expenses 299 256
Total Post Employment Benefit Charged to the Deficit on the Provision of Services 22,401 48,260
Remeasurement of the net defined benefit liability comprising:
Expected return on pension fund assets in excess of interest (90,442) 81,040
Other acturial gains on assets (526) 0
Changes in demographic assumptions (16,097) 0
Changes in financial assumptions (5,135) (474,314)
Experience Loss on defined benefit obligation 54,302 80,572
Changes in effect of asset ceiling 58,094 250,276
Total Post Employment Benefit Credited to the Comprehensive Income and Expenditure
Statement 196 (62,426)
Movement in Reserves Statement
Reversal of Net Charges made to the surplus or deficit on the provision of Services for post-
employment benefits in accordance with the Code (22,401) (48,260)
IAS 19 limits the measurement of a net defined benefit asset to the lower of the surplus in the defined benefit plan and the
asset ceiling.  IAS 19 defines the asset ceiling as the present value of any economic benefits available in the form of
reductions in future contributions to the plan.  In accordance with International Financial Reporting Interpretations Committee
- Interpretation 14 (IFRIC 14), the actuary has calculated the impact of the asset ceiling as £320.913 million (2022/23
£250.276 million).  Therefore, a corresponding reduction has been applied to the defined benefit plan asset which results in
a pension net liability of £20.748 million (2022/23 £20.917 million).
Pensions Assets and Liabilities Recognised in the Balance Sheet
The amount included in the Balance Sheet arising from the Council’s obligation in respect of its defined benefit scheme is as
follows:
31 March 31 March
2024 2023
£'000 £'000
Present Value of the Defined Benefit Obligation 854,468 781,379
Present Value of Unfunded Obligation 20,748 20,917
Closing Defined Benefit Obligation 875,216 802,296
Impact of Asset Ceiling 320,913 250,276
Fair Value of Pension Fund Assets (Bid Value) (1,175,381) (1,031,655)
Net Liability in Balance Sheet 20,748 20,917
53 | Perth and Kinross Council Annual Accounts 2023/24 Page 72 of 214

Page 73

54 | Perth and Kinross Council Annual Accounts 2023/24 
A reconciliation of Perth and Kinross Council’s share of the present value of Tayside Pension Fund’s defined benefit
obligation (liabilities) is as follows:
31 March 31 March
2024 2023
£'000 £'000
Opening Defined Benefit Obligation 802,296 1,140,223
Current Service Cost 22,976 46,818
Interest Cost 37,869 29,383
Change in Financial Assumptions (5,135) (474,314)
Change in demographic assumptions (16,097) 0
Experience Gain on Defined Benefit Obligation 54,302 80,572
Estimated Benefits Paid Net of Transfers In (27,657) (25,805)
Past Service Costs (including Curtailments) 452 0
Contributions by Scheme Participants 7,856 6,972
Unfunded Pensions Payments (1,646) (1,553)
Closing Defined Benefit Obligation 875,216 802,296
A reconciliation of the movements in Perth and Kinross Council’s share of the fair value of Tayside Pension Fund’s assets is
as follows:
31 March 31 March
2024 2023
£'000 £'000
Opening Fair Value of Scheme Assets 1,031,655 1,084,228
Interest on Assets 51,738 28,197
Return on Assets Less Interest 90,442 (81,040)
Other actuarial gains 526 0
Administration Expenses (299) (256)
Contributions by Employer Including Unfunded 22,766 20,912
Contributions by Scheme Participants 7,856 6,972
Estimated Benefits Paid Plus Unfunded Net of Transfers (Out)/In (29,303) (27,358)
Closing Fair Value of Scheme Assets 1,175,381 1,031,655
31 March 31 March
2024 2023
£'000 £'000
Opening Impact of Asset Ceiling 250,276 0
Interest on impact of Asset Ceiling 12,543 0
Actuarial Losses 58,094 250,276
Closing Impact of Asset Ceiling 320,913 250,276
Perth and Kinross Council’s share of Tayside Pension Fund’s assets at 31 March 2024 comprised:
£'000 % £'000 %
Equities 847,604 72% 745,175 72%
Gilts 74,161 6% 24,947 2%
Other Bonds 77,223 7% 130,394 13%
Property 104,188 9% 100,927 10%
Cash 71,920 6% 28,419 3%
Alternatives 285 0% 1,793 0%
Total 1,175,381 100% 1,031,655 100%
31 March 2024 31 March 2023
54 | Perth and Kinross Council Annual Accounts 2023/24 Page 73 of 214

Page 74

55 | Perth and Kinross Council Annual Accounts 2023/24 
A further breakdown of the assets is as follows:
Equities
Consumer 8% 7%
Manufacturing 8% 2%
Energy and Utilities 2% 3%
Financial Institutions 8% 9%
Health and Care 6% 7%
Information Technology 8% 6%
Others 3% 9%
43% 43%
Debt Securities
Corporate Bonds 4% 12%
UK Government Bonds 0% 0%
Others 1% 2%
5% 14%
Private Equity 2% 0%
Property
UK Property 9% 10%
9% 10%
Investment Fund Unit Trusts
Equities 37% 28%
Bonds 2% 2%
39% 30%
Cash and Cash Equivalents 2% 3%
Total 100% 100%
28 February 2024 28 February 2023
Basis for Estimating Assets and Liabilities
Liabilities have been assessed on an actuarial basis using the projected unit credit method, an estimate of the pensions that
will be payable in future years dependent on assumptions about mortality rates, salary levels, etc.  Both the Local
Government Pension Scheme and Discretionary Benefits liabilities have been assessed by Barnett Waddingham Public
Sector Consulting, an independent firm of actuaries.  Estimates for the Tayside Pension Fund are based on the latest full
valuation of the scheme as at 31 March 2023.
The principal assumptions used by the actuary have been:
2023/24 2022/23
Mortality Assumptions
Longevity at 65 for Current Pensioners:
- Men 18.9 19.0
- Women 21.6 22.4
Longevity at 65 for Future Pensioners:
- Men 20.2 20.4
- Women 23.1 23.9
Rate of Increase in Salaries 4.0% 3.9%
Rate of Increase in Pensions 3.0% 2.9%
Rate for Discounting Scheme Liabilities 4.9% 4.8%
The liabilities show the underlying commitments that the Council has in the long run to pay post-employment (retirement)
benefits.  The net liability of £20.748 million has a substantial impact on the net worth of the Council as recorded in the
Balance Sheet.  However, statutory arrangements for funding the deficit mean that the financial position of the Council
remains sound:
- Finance is only required to be raised to cover discretionary benefits when the pensions are actually paid. 
55 | Perth and Kinross Council Annual Accounts 2023/24 Page 74 of 214

Page 75

56 | Perth and Kinross Council Annual Accounts 2023/24 
The total contribution expected to be made to the Local Government Pension Scheme by the Council in the year to 31
March 2025 is £19.318 million.
Sensitivity Analysis
The estimation of the defined benefit obligations is sensitive to the actuarial assumptions set out in the tables above.  The
sensitivity analysis below have been determined based on reasonably possible changes of the assumptions occurring at the
end of the reporting period and assumes for each change that the assumption analysed changes while all the other
assumptions remain constant.  In practice, this is unlikely to occur, and changes in some of the assumptions may be
interrelated.  The estimations in the sensitivity analysis have followed the accounting policies for the scheme, i.e. on an
actuarial basis using the projected unit credit method.  The methods and types of assumptions used in preparing the
sensitivity analysis below did not change from those used in the previous period. 
£m £m £m £m £m
Adjustment to discount rate +0.5% +0.1% 0% -0.1% -0.5%
- Present value of total obligation  £809.859 £861.478 £875.216 £889.309 £949.478
- Projected Service cost  £20.719 £23.513 £24.270 £25.051 £28.450      
Adjustment to long term salary increase +0.5% +0.1% 0% -0.1% -0.5%
- Present value of total obligation  £882.464 £876.645 £875.216 £873.797 £868.220
- Projected Service cost  £24.346 £24.285 £24.270 £24.254 £24.193      
Adjustment to pension increases and
deferred revaluation
+0.5% +0.1% 0% -0.1% -0.5%
- Present value of total obligation  £943.341 £888.136 £875.216 £862.627 £815.390
- Projected Service cost  £28.568 £25.062 £24.270 £23.503 £20.607 
£m £m £m
Adjustment to mortality age rating assumption + 1 year None -1 year
Present value of total obligation  £911.067 £875.216 £840.954
Projected Service cost  £25.169 £24.270 £23.395 
19. Related Parties
The Council is required to disclose material transactions with related parties – bodies or individuals that have the potential to
control or influence the Council or to be controlled or influenced by the Council.  Disclosure of these transactions allows
readers to assess the extent to which the Council might have been constrained in its ability to operate independently or
might have secured the ability to limit another party’s ability to bargain freely with the Council.
Scottish Government
The Scottish Government has effective control over the general operations of the Council – it is responsible for providing the
statutory framework within which the Council operates, provides the majority of its funding in the form of grants and
prescribes the terms of many of the transactions that the Council has with other parties (e.g. Council Tax bills).  Grants
received from government departments are set out in the subjective analysis in Note 14 on expenditure and income
analysed by nature. 
Tayside Valuation Joint Board
The Tayside Valuation Joint Board provides services on behalf of Perth and Kinross, Angus and Dundee Councils.  The
Council does not have any direct control or influence over the board and the amount payable to this body for valuation
services and electoral registration services was £1.733 million (2022/23 £1.619 million).  £1.436 million is disclosed in the
Comprehensive Income and Expenditure Statement under Valuation Joint Board and £297,000 under Corporate and
Democratic Services for electoral and registration services.
Members
Members of the Council have direct control over the Council’s financial and operating policies.  The total of members’
allowances paid in 2023/24 is shown in the Remuneration Report.  During 2023/24, two councillors had an interest in
businesses from which the Council commissioned works and services to the value of £3,262 and £200 respectively. 
Contracts were entered into in full compliance with the Council’s standing orders and the Councillors’ Code of Conduct.  
56 | Perth and Kinross Council Annual Accounts 2023/24 Page 75 of 214

Page 76

57 | Perth and Kinross Council Annual Accounts 2023/24 
In addition, the Council makes revenue and capital payments to a large number of organisations on which Council members
are represented. 
Chief Officers
Chief Officers of the Council have control over the Council’s financial and operating policies.  The total of Chief Officers’
remuneration is shown in the Remuneration Report.  Officers have a responsibility to adhere to a Code of Conduct which
requires them to declare any interests in matters that directly or indirectly influence, or be thought to influence, their
judgement or decisions taken during their work.
There are no significant related party transactions with Chief Officers of the Council.
Live Active Leisure Ltd
This organisation provides leisure services within the area served by the Council.  A grant was provided in 2023/24
amounting to £4.931 million (2022/23 £4.815 million).  It is a sole member Company with the Council as that member.
Perth Theatre and Concert Hall Ltd
This organisation operates Perth Concert Hall and Perth Theatre.  A grant was provided in 2023/24 amounting to £1.142
million (2023/24 £1.0620 million).  It is a sole member Company with the Council as that member.
Culture Perth and Kinross Ltd
This organisation has operated libraries, museums and arts galleries in Perth and Kinross since 1 April 2016.  A grant was
provided in 2023/24 amounting to £3.392 million (2022/23 £3.219 million).  It is a sole member Company with the Council as
that member.
Tayside Contracts Joint Committee
This organisation provides roads maintenance, catering and cleaning services to the Council.  Payments to Tayside
Contracts in 2023/24 amounted to £36.562 million (2022/23 £33.443 million.  The Joint Committee is administered and
controlled by Dundee City, Angus and Perth and Kinross Councils.
Health and Social Care Partnership
This organisation is a joint venture between Perth and Kinross Council and Tayside Health Board and has since 1 April 2016
provided an integrated Health and Social Care service.  Contributions to the Health and Social Care Partnership in 2023/24
amounted to £83.241 million (2022/23 £79.034 million) and income received from the Partnership for commissioned services
was £105.639 million (2022/23 £94.310 million).  The Council has a Creditor of £4.794 million due to the Health and Social
Care Partnership as at 31 March 2024 (2022/23 £9.009 million).  
57 | Perth and Kinross Council Annual Accounts 2023/24 Page 76 of 214

Page 77

58 | Perth and Kinross Council Annual Accounts 2023/24 
20. Leases
Council as Lessee
The Council operates a Lease Car Scheme which is available to eligible employees and lease rental payments are
recovered from employees.  The car leasing agreements are due to expire during the financial years 2024/25 to 2026/27.  
The Council has also acquired the use of a number of properties by entering into leasing arrangements.  The majority of
such properties are used for office accommodation and any capital works undertaken within these premises are written
down over the shorter of the lease term or the useful life of the property.  
The future minimum lease payments due under non-cancellable leases in future years are:
2023/24 2022/23
£'000 £'000
Not later than one year 166 124
Later than one year and not later than five years 272 250
Later than five years 536 539
974 913
The expenditure charged to the Services lines in the Comprehensive Income and Expenditure Statement during the year in
relation to these leases was:
2023/24 2022/23
£'000 £'000
Minimum lease payments 170 156
Sublease payments receivable (21) (18)
149 138
Council as Lessor
The Council leases out property under operating leases at normal market rents with the following purpose:
Land for the generation of rental income arising from its use; land and buildings, which include offices and shops, for the
supply of suitable business accommodation to promote economic development or satisfy social needs, or to solely generate
rental income for the Council.  
The total future minimum lease payments receivable under non-cancellable leases in future years are:
2023/24 2022/23
£'000 £'000
Not later than one year 1,289 1,358
Later than one year and not later than five years 4,063 4,309
Later than five years 49,536 47,835
54,888 53,502
The minimum lease payments receivable do not include rents that are contingent on events taking place after the lease was
entered into, such as adjustments following rent reviews.  There were no material adjustments in respect of contingent rents
during the years 2022/23 and 2023/24.  
58 | Perth and Kinross Council Annual Accounts 2023/24 Page 77 of 214

Page 78

21. Property, Plant and Equipment
Movements on Fixed Assets 2023/24 in respect of Property, Plant and Equipment are shown below:
Movements in 2023/24 Other Vehicles Assets PFI and DBFM
Council Land and Plant and Community Surplus Under Total Assets
Dwellings Buildings Equipment Assets Assets Construction PPE included in PPE
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Gross Book Value
As at 1 April 2023 359,761 750,076 67,420 25,569 1,783 56,047 1,260,656 220,689
Additions 19,974 32,667 13,153 895 0 25,307 91,996 31
Revaluation increases recognised in the
Revaluation Reserve 0 44,764 0 0 0 0 44,764 26,020
Revaluation decreases recognised in the
Revaluation Reserve (60,412) (25,962) 0 0 (5) 0 (86,379) (19,369)
Revaluation increases recognised in the
Surplus / Deficit on the Provision of Services 0 2,395 0 0 70 0 2,465 0
Revaluation decreases recognised in the
Surplus / Deficit on the Provision of Services (2,207) (35,943) 0 0 (41) 0 (38,191) (5,595)
Derecognition - Disposals (4,663) (1,004) (4,020) 0 (223) 0 (9,910) 0
Asset reclassifications 7,229 38,568 0 0 (891) (44,906) 0 0
Other movements 0 0 1 1 (2) (1) (1) 0
As at 31 March 2024 319,682 805,561 76,554 26,465 691 36,447 1,265,400 221,776
Depreciation
As at 1 April 2023 (40,221) (30,506) (43,195) (15,195) 0 0 (129,117) (5,818)
Depreciation charge for 2023/24 (16,413) (21,112) (9,011) (1,188) 0 0 (47,724) (5,949)
Depreciation written out to the
Revaluation Reserve - Revaluation Gain 0 10,108 0 0 0 0 10,108 1,771
Depreciation written out to the
Revaluation Reserve - Revaluation Loss 51,864 3,647 0 0 0 0 55,511 1,348
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Gain 0 1,463 0 0 0 0 1,463 0
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Loss 107 733 0 0 0 0 840 181
Derecognition - Dispoals 4,663 78 3,847 0 0 0 8,588 0
Other movements 0 (6) 5 0 0 0 (1) 0
As at 31 March 2024 0 (35,595) (48,354) (16,383) 0 0 (100,332) (8,467)
Net Book Value at 31 March 2024 319,682 769,966 28,200 10,082 691 36,447 1,165,068 213,309
59 | Perth and Kinross Council Annual Accounts 2023/24 Page 78 of 214

Page 79

The reporting of book values for Infrastructure Assets is amended following the issue of the Local Government Finance Circular 09/2022.  The Finance Circular outlines historic issues for
the consistent accounting treatment of derecognised infrastructure components and the reporting of book values by local authorities.  A CIPFA task group is progressing a remedy and the
CIPFA Code will be updated in due course.  To satisfy the audit of the 2023/24 accounts, the following statutory overrides are provided in the Circular: -
Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2024 a local authority is not required to report the gross cost and accumulated depreciation for
infrastructure assets.
Statutory Override 2: For accounting periods commencing from 1 April 2010 until 31 March 2024 the carrying amount to be derecognised in respect of a replaced part of an infrastructure
asset is to be taken to be and accounted for as a nil amount.  No subsequent adjustment shall be made to the carrying amount of the asset with respect to that part.
The Council has elected to adopt both statutory overrides.  The Net Book Value above excludes Infrastructure Assets, when these assets are included the NBV is as follows: 
Infrastructure
Assets
£'000
Net Book Value at 1 April 2023 290,325
Additions 75,361
Depreciation (17,921)
Net Book Value at 31 March 2024 347,765
The total for all PPE, when Infrastructure Assets are included, is set out below:
Total PPE
£'000
Total PPE (above) 1,165,068
Net Book Value of Infrastructure Assets 347,765
Total PPE Net Book Value at 31 March 2024 (including Infrastructure Assets) 1,512,833
60 | Perth and Kinross Council Annual Accounts 2023/24 Page 79 of 214

Page 80

Property, Plant and Equipment cont’d
Comparative Movements in 2022/23 (restated) *Other Vehicles Assets *PFI and DBFM
Council Land and Plant and Community Surplus Under Total Assets
Dwellings Buildings Equipment Assets Assets Construction PPE included in PPE
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Gross Book Value
As at 1 April 2022 345,995 661,742 61,969 24,740 1,873 25,343 1,121,662 173,563
Additions 13,053 11,418 8,551 829 20 33,623 67,494 89
Revaluation increases recognised in the
Revaluation Reserve 0 70,579 0 0 10 0 70,589 47,037
Revaluation decreases recognised in the
Revaluation Reserve 0 (1,305) 0 0 (65) 0 (1,370) 0
Revaluation increases recognised in the
Surplus / Deficit on the Provision of Services 0 9,939 0 0 0 0 9,939 0
Revaluation decreases recognised in the
Surplus / Deficit on the Provision of Services 0 (2,287) 0 0 (55) 0 (2,342) 0
Derecognition - Disposals (1,003) (10) (3,100) 0 0 (1,203) (5,316) 0
Asset reclassifications 1,716 0 0 0 0 (1,716) 0 0
Other movements 0 0 0 0 0 0 0 0
As at 31 March 2023 359,761 750,076 67,420 25,569 1,783 56,047 1,260,656 220,689
Depreciation
As at 1 April 2022 (27,829) (33,820) (38,142) (13,976) 0 0 (113,767) (9,509)
Depreciation charge for 2022/23 (13,112) (17,336) (8,122) (1,219) 0 0 (39,789) (4,753)
Depreciation written out to the
Revaluation Reserve - Revaluation Gain 0 16,924 0 0 0 0 16,924 8,444
Depreciation written out to the
Revaluation Reserve - Revaluation Loss 0 131 0 0 0 0 131 0
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Gain 0 3,333 0 0 0 0 3,333 0
Depreciation written out to the Surplus / Deficit
on the Provision of Services - Revaluation Loss 0 258 0 0 0 0 258 0
Derecognition - Dispoals 720 4 3,069 0 0 0 3,793 0
Other movements 0 0 0 0 0 0 0 0
As at 31 March 2023 (40,221) (30,506) (43,195) (15,195) 0 0 (129,117) (5,818)
Net Book Value at 31 March 2023 319,540 719,570 24,225 10,374 1,783 56,047 1,131,539 214,871
* Other Land and Buildings – The opening Gross Book Value and Depreciation for Other Land and Buildings have been restated to reflect an update to 2021/22 following the 
transfer between categories of an asset where the revaluation transactions of that asset remained in Other Land and Buildings.  This has not impacted Net Book Value.
* PFI and DBFM Assets – In 2022/23 a revaluation exercise was undertaken of all schools valued on a depreciated replacement cost basis.  This revaluation was adjusted for 
in Other Land and Buildings.  The separate disclosure relating to PFI and DBFM amounts included within PPE was omitted and the restatement in the note updates for this. 
61 | Perth and Kinross Council Annual Accounts 2023/24 Page 80 of 214

Page 81

The reporting of book values for Infrastructure Assets is amended following the issue of the Local Government Finance Circular 09/2022.
The Net Book Value above excludes Infrastructure Assets, when these assets are included the NBV is as follows: 
Infrastructure
Assets
£'000
Net Book Value at 1 April 2022 247,686
Additions 58,093
Depreciation (15,454)
Net Book Value at 31 March 2023 290,325
The total for all PPE, when Infrastructure Assets are included, is set out below:
Total PPE
£'000
Total PPE (above) 1,131,539
Net Book Value of Infrastructure Assets 290,325
Total PPE Net Book Value at 31 March 2023 (including Infrastructure Assets) 1,421,864
62 | Perth and Kinross Council Annual Accounts 2023/24 Page 81 of 214

Page 82

63 | Perth and Kinross Council Annual Accounts 2023/24 
Property, Plant and Equipment cont’d
Capital Commitments
At 31 March 2024, the Council has entered into a number of contracts for the construction or enhancement of Property, Plant
and Equipment in 2023/24 and future years budgeted to cost £120.622 million.  Similar commitments at 31 March 2023 were
£249.781 million.  The total commitment is made up of the following:
2023/24 2022/23
£'000 £'000
Cultural Attractions 0 13,010
Education Projects 71,412 96,730
Roads and Bridges Improvement Schemes 44,745 133,703
Fleet Vehicles 1,142 0
Council Dwellings 1,172 821
Community Assets 133 3,869
Other Capital Projects 2,018 1,648
120,622 249,781
Education projects include Perth High School and Blairgowrie Recreation Centre.  Roads and Bridges Improvement
Schemes includes the Cross Tay Link Road (Destiny Bridge).
Valuation of Assets
Revaluations
The Council carries out a rolling programme that ensures all Property, Plant and Equipment required to be measured at its
current value is revalued at least every five years.
The Council commissioned a valuation for Council Dwellings and for a further selection of assets which was performed
during the last quarter of financial year 2023/24.  In addition, the Council’s internal valuers performed valuations for a
number of assets, including investment properties, art galleries and museums, community centres, day care centres, town
halls, libraries, residential homes, PFI community campuses and properties requiring revaluation due to redevelopment or a
change of use, during the last quarter of financial year 2023/24.  In applying the Royal Institution of Chartered Surveyors
(RICS) Valuation Global Standards (‘Red Book’), the valuation reports include an explanatory note which provides an update
on market conditions and confirms that markets are functioning again and there is adequate evidence on which to base an
opinion of value.  However, uncertainties do remain and there is the potential for markets to move rapidly in response to the
effects of conflict in Eastern Europe and the Middle East.
The valuation reports have been used to inform the measurement of non-current assets in these financial statements.  The
valuers have continued to exercise professional judgment in preparing the valuations and, therefore, this is the best
information available to the Council as at 31 March 2024 and can be relied upon.
Note 4 – Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty provides additional
information.
Surplus Assets are valued annually on a fair value basis.  In terms of the fair value hierarchy, all Surplus Assets are valued
at Level 2 and there were no transfers between Levels during the year.
The table below sets out the Gross Book Value of asset categories carried at historic cost and current value at 31 March
2024, and shows the progress of the Council’s five-year rolling revaluation programme for property, plant and equipment. 
Other
Council Land and Surplus
Dwellings Buildings Assets Total
£'000 £'000 £'000 £'000
Carried at historical cost 0 40,373 2 40,375
Values at current value as at:
31 March 2024 319,682 323,257 409 643,348
31 March 2023 0 416,041 40 416,081
31 March 2022 0 4,389 0 4,389
31 March 2021 0 17,460 240 17,700
31 March 2020 0 4,041 0 4,041
Total Cost or Valuation 319,682 805,561 691 1,125,934
Changes in Estimates
The Council has made no material changes to accounting estimates for Property, Plant and Equipment in 2023/24. 
63 | Perth and Kinross Council Annual Accounts 2023/24 Page 82 of 214

Page 83

64 | Perth and Kinross Council Annual Accounts 2023/24 
22. Heritage Assets
Reconciliation of the carrying value of Heritage Assets held by the Council
Art War Other Total
Collection Memorials
£'000 £'000 £'000 £'000
Cost or Valuation
Balance at 1 April 2022 51,740 48 26 51,814
Balance at 31 March 2023 51,740 48 26 51,814
Cost or Valuation
Balance at 1 April 2023 51,740 48 26 51,814
Balance at 31 March 2024 51,740 48 26 51,814
Art Collection
The collection of Fine Art maintained and preserved by Culture Perth and Kinross, on behalf of Perth and Kinross Council is
varied and includes oil paintings (approximately 1,225 items), watercolours (900), drawings (4,000), prints (1,500), and
sculptures (150).  The Fine Art collection also includes J D Fergusson and Margaret Morris archives which number
approximately 30,000 items and include a number of significant works. 
The Art Collection also includes silver, glass, ceramics, furniture, Oriental materials, horology and metalwork; these are
collectively identified as Applied Art.
Curators within Culture Perth and Kinross carry out a five year rolling programme of valuation for items and collections
having significant value.  The last valuation took place in 2020/21 with the next revaluation scheduled for 2025/26.  
There were no significant additions to Heritage Assets in 2022/23 or 2023/24. 
Additions and Disposals of Heritage Assets
There has been no significant addition, either by purchase or donation, to the Fine and Applied Art collection during the
current and previous five financial years.  The majority of the collections are held in perpetuity, or have disposal conditions
attached, and consequently no Fine and Applied Art disposals have occurred during the current and previous five financial
years.
Fine and Applied Art
The Fine Art collection owes its existence largely to the 1,926 bequests of local patrons Robert Hay Robertson and Robert
Brough, although the first painting entered the collection as early as 1785.
The collection is international in its scope and numbers over 4,000 items.  It includes an interesting group of Italian ‘Old
Masters’, a small but important group of 19th Century French works, a good group of 17th century Dutch and Flemish
paintings and work by English artists including a small but highly important collection of natural history watercolours by
Beatrix Potter.
Its greatest strength however lies in its holding of Scottish pictures.  These span the 16th to the 21st century and include
such important works as Loch Katrine by Horatio McCulloch and D Y Cameron’s The Wilds of Assynt, as well as pictures
with strong local connections.  Amongst these are pictures by local artists, local topographical views and portraits of local
individuals.  The collection seeks to retain a balance between the historical and the contemporary aspects whilst continuing
to develop the holdings of works of specifically local interest.
In 1991 the collection was effectively doubled in size with the gifting of the J D Fergusson Art Foundation’s collection of
artworks by the Scottish ‘Colourist’ John Duncan Fergusson (1874-1961) and its associated archive.  This collection is
housed at the Fergusson Gallery in Perth.
The Applied Art collection has been acquired since 1785 through purchase, gift or bequest.  It covers a wide variety of
objects and materials, within which the collections of Perth silver and Perthshire glass are unsurpassed in terms of national
importance.  The ceramics collection contains significant collections of Staffordshire flat-back figures and Martinware studio
pottery as well as a collection of studio pottery produced by potters native to or resident in the Perth and Kinross area. 
Other smaller collections include furniture, timepieces, oriental and other items.
The promotion of other cultural events and programmes during the year makes it difficult to reliably estimate the percentage
of the Art Collection on display for public viewing.  However, all items are held in secure storage and access is permitted to
scholars and others for research purposes.
The museum collection also includes History and Natural History collections for which an amount of insurance cover has
been obtained.  These objects and collections, in most instances, are rare and irreplaceable and there is insufficient 
64 | Perth and Kinross Council Annual Accounts 2023/24 Page 83 of 214

Page 84

65 | Perth and Kinross Council Annual Accounts 2023/24 
evidence on which to place a reliable estimate of value.  There are in excess of 289,000 items within the History and Natural
History collections and the cost of obtaining valuations would be disproportionate in terms of any benefit derived to the user
of the financial statements.  On this basis, the History and Natural History collections are, therefore, excluded from the
carrying value of Heritage Assets held by the Council.
The Culture Perth and Kinross Limited Collections Management Framework provides guidance on the collection, disposal or
lending of heritage assets.
23. Investment Properties
2023/24 2022/23
£'000 £'000
Rental income from investment property (910) (903)
Direct operating expenses arising from investment property 61 103
Balance at end of year (849) (800)
The following table summarises the movement in the fair value of investment properties over the year:
2023/24 2022/23
£'000 £'000
Balance at start of year 15,015 14,060
Net (loss) / gain from fair value adjustments (300) 955
Balance at end of year 14,715 15,015
All of the Authority's investment properties are valued at Level 2 on the fair value hierarchy.  Values as at 31 March 2024 and
31 March 2023 are as follows:
2023/24 2022/23
£'000 £'000
Recurring fair value measurements using:
Industrial and Commercial Land 13,455 13,935
Shops and Offices 695 750
Other Investment Properties 565 330
Total Fair Value 14,715 15,015
Valuation Techniques used to Determine Level 2 and 3 Fair Values for Investment Properties
Significant Observable Inputs – Level 2
The majority of the value of Industrial and Commercial Land relates to sites leased out on ground leases.  Market data is
available at national and local levels from sector specialists to provide the valuers with information, such as trends and rent
yields, for the commercial and industrial markets.  Local market activity for ground leases tends to follow national trends and
valuations are undertaken using a discounted income approach.  Ground leases are longer term arrangements and sites of
this nature enjoy 100% occupancy levels; the rental income stream is known and market data for rent yields is available, all
of which are observable input.  As a result of the conditions of the ground lease agreement, there is no unobservable input. 
The valuation of investment land leased out on a ground lease therefore requires the use of observable market data and
minimal, if any, unobservable data and is regarded as Level 2.
Market data providing information on trends and rent yield is available from sector specialists for leased Shops and Offices. 
Local market data is used to assist the valuation process, and valuations are undertaken using the income approach,
discounted using market rates to arrive at a net present value for the income stream.  The valuer will also consider other
factors, such as the age and condition of the property, when arriving at the final valuation.  This requires judgement; however
any unobservable input is not considered to be significant in terms of any adjustment to the fair value of the property.  The
valuation of the shops and offices is mainly representative of the available market data, and the valuation input is primarily
based on observable data.  Therefore, the properties are categorised as Level 2. 
Other Investment Properties primarily relate to land held for development by the private sector, which will generate a receipt
to the Council on disposal.  Sites held for redevelopment are valued on the basis of the highest and best use of the site,
taking into account adjacent and surrounding property, recent market activity, and development plan restrictions.  The
valuation of these sites is therefore based upon observable input, i.e. local market data, and as such will be regarded as
Level 2.  
65 | Perth and Kinross Council Annual Accounts 2023/24 Page 84 of 214

Page 85

66 | Perth and Kinross Council Annual Accounts 2023/24 
Highest and Best Use of Investment Properties
In estimating the fair value of the authority’s investment properties, the highest and best use of the properties is their current
use.
Valuation Techniques
There has been no change in the valuation techniques used during the year for investment properties.
Valuation Process for Investment Properties
The fair value of the Council’s investment property is measured annually at each reporting date.  All valuations are carried
out internally, in accordance with the methodologies and bases for estimation set out in the professional standards of the
Royal Institution of Chartered Surveyors.  The Council’s valuation experts work closely with finance officers reporting directly
to the Chief Finance Officer on a regular basis regarding all valuation matters.
The valuation reports have been used to inform the measurement of Investment properties in these financial statements. 
The valuers have continued to exercise professional judgement in preparing the valuation and, therefore, this is the best
information available to Council as at 31 March 2024 and can be relied upon.
24. Intangible Assets
The movement on Intangible Asset balances during the year is as follows:
2023/24 2022/23
Assets Assets
£'000 £'000
Balance at start of year
Gross carrying amount 3,958 3,643
Accumulated amortisation (2,995) (1,969)
Net carrying amount at start of year 963 1,674
Additions: Purchases 334 315
Amortisation for the period (949) (1,026)
Net carrying amount at end of year 348 963
Comprising:
Gross carrying amounts 4,292 3,958
Accumulated amortisation (3,944) (2,995)
348 963
Intangible Assets include the cost of software licences and bespoke software solutions deemed to provide future benefit to
the Council.  These items have been included and amortised over their perceived useful life. 
25. Assets Held for Sale
2023/24 2022/23 2023/24 2022/23
£'000 £'000 £'000 £'000
Balance outstanding at start of year 273 273 403 403
Other movements 403 0 (403) 0
Balance outstanding at year end 676 273 0 403
Current Non Current
26. Long Term Debtors
2023/24 2022/23
£'000 £'000
Other Entities and Individuals 543 541
Total 543 541
66 | Perth and Kinross Council Annual Accounts 2023/24 Page 85 of 214

Page 86

67 | Perth and Kinross Council Annual Accounts 2023/24 
27. Inventories
2023/24 2022/23
£'000 £'000
Balance outstanding at start of year 441 578
Purchases 3,521 3,617
Recognised as an expense in the year (3,330) (3,754)
Balance outstanding at end of year 632 441
Consumables and
Maintenance Materials
28. Debtors
2023/24 2023/24 2022/23 2022/23
£'000 £'000 £'000 £'000
Gross Net Gross Net
Scottish Government 18,429 19,193
Central Government 12,290 10,448
Other Local Authorities 485 774
NHS Bodies 670 3,421
Other Entities and Individuals:
Housing Rent 2,185 2,297
less: Impairment (1,845) (1,842)
340 455
Statutory Additions 6,066 5,735
less: Impairment (6,066) (5,735)
0 0
Other 8,489 10,048
less: Impairment (1,853) (1,906)
6,636 8,142
Trade 10,282 7,063
less: Impairment (1,306) (1,192)
8,976 5,871
Council Tax 21,350 19,458
less: Impairment (16,832) (15,743)
4,518 3,715
Total 52,344 52,019
29. Creditors
2023/24 2023/24 2022/23 2022/23
£'000 £'000 £'000 £'000
Gross Net Gross Net
Scottish Government (793) (3,905)
Central Government (7,021) (7,702)
Other Local Authorities (6,420) (7,937)
NHS Bodies (909) (1,450)
Public Corporations and Trading Funds 0 (9)
Other Entities and Individuals:
Employee Statutory Adjustment Account (8,186) (8,524)
Prepaid Council Tax (2,261) (2,379)
Other (23,199) (23,451)
(33,646) (34,354)
Trade Creditors (42,822) (40,747)
Total (91,611) (96,104)
67 | Perth and Kinross Council Annual Accounts 2023/24 Page 86 of 214

Page 87

68 | Perth and Kinross Council Annual Accounts 2023/24 
30. Provisions Other than Bad and Doubtful Debts
Self-Insured/Uninsured Losses
The Insurance Fund makes provision for losses arising from Property, Employers’ Liability, Public Liability, Motor, Fidelity
Guarantee, Computer, Engineering and Travel/Personal Accident claims.
The provision provides for an estimate of all liabilities likely to be incurred by the Council in respect of self-insured and
uninsured losses in respect of incidents that have arisen prior to 1 April 2024.
Payments to 3rd parties
The Council has made provision for a number of potential compensation claims arising from significant capital projects within
the Council’s capital programme.
Commercial Rent
The Council manages the rental leases for a number of commercial properties.  The Council had previously made provision
for rent refunds due to the downturn in the economic climate affecting retail trading performance.  The provision at 31 March
2024 is to meet any potential liability for the years 2022/23 and 2023/24.
Self Insured/ Payments Commercial Total
Uninsured to 3rd parties Rent
Losses
£'000 £'000 £'000 £'000
Balance as at 1 April 2023 2,607 2,960 40 5,607
Additional provisions made in 2023/24 1,548 1,136 20 2,704
Amounts used in 2023/24 (2,255) (804) (20) (3,079)
Balance as at 31 March 2024 1,900 3,292 40 5,232
Balance Sheet Disclosure:
Less than 12 months 523 1,125 20 1,668
Over 12 months 1,377 2,167 20 3,564
1,900 3,292 40 5,232
31. Usable Reserves
Movements in the Council’s Usable Reserves are detailed in the Movement in Reserves Statement and notes 5 and 6.
32. Unusable Reserves
2023/24 2022/23
£'000 £'000
Revaluation Reserve (425,931) (411,175)
Capital Adjustments Account (338,099) (400,119)
Financial Instruments Adjustment Account 16,358 17,002
Pensions Reserve 20,748 20,917
Employee Statutory Adjustment Account 8,186 8,524
Total Unusable Reserves (718,738) (764,851)
Revaluation Reserve
The Revaluation Reserve contains the gains made by the Council arising from increases in the value of its Property, Plant
and Equipment.  The balance is reduced when assets with accumulated gains are:  
- re-valued downwards or impaired and the gains are lost;  
- used in the provision of services and the gains are consumed through depreciation; or
- disposed of and the gains are realised.  
The Reserve contains only revaluation gains accumulated since 1 April 2007, the date that the Reserve was created. 
Accumulated gains arising before that date are consolidated into the balance on the Capital Adjustment Account.
68 | Perth and Kinross Council Annual Accounts 2023/24 Page 87 of 214

Page 88

69 | Perth and Kinross Council Annual Accounts 2023/24 
2023/24 2022/23
£'000 £'000
Balance at 1 April (411,175) (332,433)
Upward revaluation of assets (54,872) (87,513)
Downward revaluation of assets and impairment losses not charged to the (Surplus)/
Deficit on the Provision of Services 30,869 1,239
Sub-Total (435,178) (418,707)
Difference between fair value depreciation and historical cost depreciation 8,811 7,408
Accumulated gains on assets sold or scrapped written out to the Capital
Adjustment Account 436 124
Total Unusable Reserves (425,931) (411,175)
Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements for accounting for the
consumption of non-current assets and for financing the acquisition, construction or enhancement of those assets under
statutory provisions.  The Account is debited with the cost of acquisition, construction or enhancement as depreciation,
impairment losses and amortisations are charged to the Comprehensive Income and Expenditure Statement.  The Account
is credited with the amounts set aside by the Council as finance for the costs of acquisition, construction and enhancement.
The Account contains accumulated gains and losses on Investment Properties and gains recognised on donated assets that
have yet to be consumed by the Council.
The Account also contains revaluation gains accumulated on Property, Plant and Equipment before 1 April 2007, the date
that the Revaluation Reserve was created to hold such gains.
Note 5 provides details of the source of all the transactions posted to the Account, apart from those involving the Revaluation
Reserve.
2023/24 2022/23
£'000 £'000
Balance at 1 April (400,119) (372,978)
Reversal of items relating to capital expenditure debited or credited to the Comprehensive
Income and Expenditure Statement
Charges for depreciation and impairment of non current assets 56,836 47,835
Revaluation (gains)/losses on Property, Plant and Equipment 33,423 (11,187)
Amortisation of intangible assets 949 1,026
Revenue expenditure funded from capital under statute 3,770 838
Amounts of non current assets written off on disposal as part of the gain/loss 1,322 1,523
(303,819) (332,943)
Adjusting amounts written out of the Revaluation Reserve (436) (124)
(304,255) (333,067)
Capital financing applied in the year:
Use of the Capital Receipts Reserve to finance new capital expenditure (1,983) (1,360)
Capital grants and contributions credited to the Comprehensive Income and Expenditure
Statement (46,429) (42,656)
Application of grants to capital financing from the Capital Grants Unapplied Account 0 0
Statutory provision for the financing of capital investment charged against the General
Fund and HRA balances (15,260) (15,690)
Statutory adjustment for Financial Flexibilities applied to Service Concession
Arrangements (see note 36) 34,262 0
Capital expenditure charged against the general fund and HRA balances (4,734) (6,391)
(338,399) (399,164)
Movements in the fair value of the Investment Properties 300 (955)
Balance at 31 March (338,099) (400,119)
69 | Perth and Kinross Council Annual Accounts 2023/24 Page 88 of 214

Page 89

70 | Perth and Kinross Council Annual Accounts 2023/24 
Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account (FIAA) is used to hold the losses or gains arising on the early redemption of
loans per statutory provisions, as well as the historic timing differences arising from the different arrangements for
accounting for income and expenses relating to certain financial instruments.  These statutory provisions allow for annual
charges to be made in accordance with the original amortisation schedules which existed at the time the provisions were
introduced.  
The Council uses the Account to manage the balance of premiums and discounts which existed at 31 March 2007 which
arose on the early redemption of loans.  Any premiums or discounts incurred or received after this date are also held in this
Account.  These are subsequently charged to the General Fund and Housing Revenue Account (HRA) in accordance with
statutory provisions, and so spreading the burden on Council Tax and Housing Rents.  
The Council also uses the FIAA to hold the difference in interest charges which arose on stepped interest rate loans.  These
had low interest rates in the early years before “stepping up” to a higher interest rate.  Interest on such loans is now required
to be charged consistently over the life of the loan using the Effective Interest Rate Method.  The difference in the cumulative
charges to 31 March 2007 under this new method was debited to the FIAA and will be charged to the General Fund and the
HRA over the life of the loans under the statutory provisions.
Accordingly, the balance on the FIAA as at 31 March 2024 in respect of the above provisions will be charged to the General
Fund and HRA over the next 44 years.  The movements on the FIAA during the year are shown below:
2023/24 2022/23
£'000 £'000
Balance at 1 April 17,002 17,650
Proportion of discounts incurred in previous financial years credited against the General
Fund and HRA Balance in accordance with statutory requirements in the year 4 4
Proportion of premiums incurred in previous financial years charged against the General
Fund and HRA Balance in accordance with statutory requirements in the year (627) (632)
Difference on restatement of Stepped Interest Rate Loans (21) (20)
Balance at 31 March 16,358 17,002
Pensions Reserve
The Pensions Reserve absorbs the timing differences arising from the different arrangements for accounting for post-
employment benefits and for funding benefits in accordance with statutory provisions.  The Council accounts for post-
employment benefits in the Comprehensive Income and Expenditure Statement as the benefits are earned by employees
accruing years of service, updating the liabilities recognised to reflect inflation, changing assumptions and investment
returns on any resources set aside to meet the costs.  However, statutory arrangements require benefits earned to be
financed as the Council makes employer’s contributions to pensions funds or eventually pays any pensions for which it is
directly responsible.  The debit balance on the Pensions Reserve therefore shows a substantial shortfall between the
benefits earned by past and current employees and the resources the Council has set aside to meet them.  The statutory
arrangements will ensure that funding will have been set aside by the time the benefits come to be paid.
2023/24 2022/23
£'000 £'000
Balance at 1 April 20,917 55,995
Actuarial Loss/(Gain) on Pensions Assets and Liabilities 196 (62,426)
Reversal of Items Relating to Retirement Benefits Debited or Credited to the Surplus or
Deficit on the Provision of Services in the Comprehensive Income and Expenditure
Statement 22,401 48,260
Employer's Pensions Contributions and Direct Payments to Pensioners Payable in the
Year (22,766) (20,912)
Balance at 31 March 20,748 20,917
70 | Perth and Kinross Council Annual Accounts 2023/24 Page 89 of 214

Page 90

71 | Perth and Kinross Council Annual Accounts 2023/24 
Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on the General Fund
Balance from accruing for compensated absences earned but not taken in the year, e.g. annual leave entitlement carried
forward at 31 March.  Statutory arrangements require that the impact on the General Fund Balance is neutralised by
transfers to or from the Account.
2023/24 2022/23
£'000 £'000
Balance at 1 April 8,524 8,003
Cancellation of accrual made at the end of the preceding year (8,524) (8,003)
Amounts accrued at the end of the current year 8,186 8,524
Balance at 31 March 8,186 8,524
33. Impairment Losses
Movements in the value of properties during the year were mainly due to the revaluation of art galleries and museums,
community centres, day care centres, town halls, libraries, residential homes, PFI community campuses, and various
individual operational buildings such as industrial units and shops.  Investment properties were also revalued during
2023/24.  All losses arising have been assessed as a revaluation loss rather than a loss attributed to deterioration in the
anticipated level of the performance of the properties.
34. Grants
The Council credited the following grants, contributions and donations to the Comprehensive Income and Expenditure
Statement in 2023/24.
2023/24 2022/23
£'000 £'000
Credited to Taxation and Non Specific Grant Income
Scottish Government 27,796 19,855
Scottish Government Bodies and Directorates 15,000 20,000
Developer Contributions 1,440 811
Other Third Party Contributions 2,193 1,990
46,429 42,656
Credited to Services
Scottish Government 32,386 32,676
Scottish Government Bodies and Directorates 246 178
Sport Scotland 414 399
Other Third Party Contributions 7,072 9,110
40,118 42,363
The Council has received a number of grants, contributions and donations that have yet to be recognised as income as they
have conditions attached to them that will require the monies or property to be returned.  The balance at the year-end is as
follows:
2023/24 2022/23
£'000 £'000
Revenue Grants  - Received in Advance
Scottish Government 566 1,583
Scottish Government - Covid-19 funding for businesses 0 294
Other grants and contributions 6 982
Balance at 31 March 572 2,859
71 | Perth and Kinross Council Annual Accounts 2023/24 Page 90 of 214

Page 91

72 | Perth and Kinross Council Annual Accounts 2023/24 
35. Capital Expenditure and Capital Financing
The total amount of capital expenditure incurred in the year is shown in the table below (including the value of assets
acquired under PFI/PPP/DBFM contracts), together with the resources that have been used to finance it.  Where capital
expenditure is to be financed in future years by charges to revenue as assets are used by the Council, the expenditure
results in an increase in the Capital Financing Requirement (CFR), a measure of the capital expenditure incurred historically
by the Council that has yet to be financed.  The CFR is analysed below.
2023/24 2022/23
£'000 £'000
Capital Financing Requirements b/fwd 679,034 618,390
Capital Expenditure
Property, Plant and Equipment 167,356 125,585
Intangible Assets 334 315
Revenue Expenditure funded from Capital 3,770 2,625
171,460 128,525
850,494 746,915
Sources of Finance
Capital Receipts (1,983) (1,363)
Government Grants and Contributions (46,429) (44,437)
Revenue Contributions (4,733) (6,391)
Service concession flexibility 34,262 0
Loans Fund Principal Repayments (15,260) (15,690)
(34,143) (67,881)
Closing Capital Financing Requirement c/fwd 816,351 679,034
Movement 137,317 60,644
Analysed as:
Increase in need to borrow 109,342 66,508
Net assets acquired under PPP contract 27,975 (5,864)
137,317 60,644
36. Public Finance Initiatives and Similar Contracts
The Council has an obligation for 25 years commencing September 2000 in respect of a unitary charge payment to be made
for office accommodation and a car park.
The unitary charge for 2023/24 for the office accommodation was £2.622 million (2022/23 £2.499 million).  
The unitary charge for 2023/24 for the car park was £405,000 (2022/23 £325,000).
Future agreed payments will increase in line with inflation.  The unitary charge payments for 2024/25 for the office
accommodation will be £2.657 million and for the car park is £380,000.
The project agreement for provision of the facilities included the transfer of four Council properties to the operator in
exchange for reduced annual payments over the life of the agreement.  At the end of this project these assets do not revert
back to the Council.  
The Council has an obligation for six school campuses in a Public Private Partnership with Axiom Education (Perth and
Kinross) Ltd.  North Inch Primary was brought into operation in 2011/12.  Breadalbane Campus at Aberfeldy was completed
in 2010/11 and the campuses at Blairgowrie, Perth South, Kinross, Crieff and the Roman Catholic School Campus were
brought into operation during 2009/10.  The Council will make unitary charge payments until the contract ends in 2042, at
which time the campuses will be handed back to the Council at no cost.  The estimated capital value of the scheme is
£127.687 million.
The unitary charge for 2023/24 for the campuses operating in the year was £21.646 million (2022/23 £18.910 million).
Future agreed payments will increase in line with inflation.  The unitary charge payments for 2024/25 for all school
campuses will be £22.618 million.  
During 2019/20 the Council incurred an obligation for Bertha Park High School with the asset and liability recognised in the
Annual Accounts.  The unitary charge for 2023/24 was £3.260 million (2022/23 £3.139 million).
Future agreed payments will increase in line with inflation.  The unitary charge for 2024/25 for Bertha Park will be £3.277
million.  
72 | Perth and Kinross Council Annual Accounts 2023/24 Page 91 of 214

Page 92

73 | Perth and Kinross Council Annual Accounts 2023/24 
Movements in Fixed Assets under Public Private Partnerships during the year were:
Restated*
2023/24 2022/23
£'000 £'000
Net Book Value at 1 April 214,871 164,965
Additions 31 89
Revaluations 1,056 54,570
Depreciation (5,949) (4,753)
Depreciation write back 3,300 0
Net Book Value at 31 March 213,309 214,871
*The presentation of the 2022/23 figures have been restated due to an omission in the revaluations figure (see note 21).
Movements in Public Private Partnership Liabilities during the year were:
2023/24 2022/23
£'000 £'000
Liabilities at 1 April 2023 121,327 127,191
Amounts repaid in year (6,287) (5,864)
Liabilities at 31 March 2024 115,040 121,327
Disclosed in the Balance Sheet as:
Long Term Liabilities 108,613 115,040
Creditors 6,427 6,287
Liabilities at 31 March 115,040 121,327
Future Public Private Partnership liabilities due to be met:
Repayment Interest Service Lifecycle Contingent TOTAL
of Liability Charges Maintenance Rentals
£'000 £'000 £'000 £'000 £'000 £'000
Due within one year 6,426 5,527 9,004 3,123 4,868 28,948
Due in 2 to 5 years 17,667 18,877 34,521 18,045 19,929 109,039
Due in 6 to 10 years 27,004 18,632 47,823 22,045 33,308 148,812
Due in 11 to 5 years 36,799 11,356 54,554 18,732 45,458 166,899
Due in 16 to 20 years 26,372 2,875 31,901 14,189 26,212 101,549
Due in 21 to 25 years 772 21 176 0 169 1,138
Total 115,040 57,288 177,979 76,134 129,944 556,385
These figures are based on the actual cash amount estimated to be payable and not on prices at 31 March 2023.
In September 2022, the Scottish Government issued statutory guidance (Local Government Finance Circular 10-2022)
which allowed Councils temporary flexibility in accounting for Service Concession Arrangements entered into prior to April
2022.  The guidance sets out the accounting requirements and options for recognising the capital repayment element of
these arrangements and permits Councils to undertake internal accounting changes to reprofile the repayment charged to
General Fund over an extended period of time.
The Service Concession Arrangements for which the revised accounting treatment has been adopted include the Council's
PPP arrangement for the six school campuses, and the Design, Build, Finance, Maintain (DBFM) scheme for the Bertha
Park Secondary School.  The Council has applied the permitted flexibility in financial year 2023/24 on a retrospective annuity
basis over 50 years.  This approach is consistent with current Council Loans Fund policy and is considered prudent,
sustainable, and affordable over the useful life of the asset.  The 50 year annuity period replicates the useful asset life of
other similar type assets held on the Council’s balance sheet i.e. schools. 
The current unitary charge repayments to contractors will continue until the end of the PPP and DBFM contracts, however,
the use of this flexibility results in a one-off credit to the General Fund and ongoing annual savings for a period of time.  At
the end of the PPP and DBFM contracts, the unitary charge is no longer paid but reprofiled debt repayments continue to be
charged to the General Fund until the debt liability has been extinguished.  The calculation of the repayment charges, using
the asset life annuity basis, is compared to the current charges which are made over the contract period.  By applying the
flexibility, a one-off combined pre 2023/24 retrospective saving of £31.186m (as detailed in the table below) will be achieved.
73 | Perth and Kinross Council Annual Accounts 2023/24 Page 92 of 214

Page 93

74 | Perth and Kinross Council Annual Accounts 2023/24 
Comparison of current and
revised debt repayments
Current
Repayment
Revised
Repayment
(Reduction) /
Cost 
£m £m £m
Pre 2023/24 44,135  12,949  (31,186)
Paid in 2023/24 4,515  1,439  (3,076)
Payable in 2024/25 4,419  1,505  (2,914)
Payable within 2 to 5 years 16,719  6,745  (9,975)
Payable within 6 to 10 years 27,004  10,327  (16,677)
Payable within 11 to 15 years 36,799  12,932  (23,867)
Payable within 16 to 20 years 26,371  16,198  (10,173)
Payable within 21 to 25 years 771  20,294  19,523
Payable within 26 to 30 years 0 25,435  25,435
Payable within 31 to 35 years 0 31,888  31,888
Payable within 36 to 40 years 0 12,229  12,229
Payable within 41 to 45 years 0 8,247  8,247
Payable within 46 to 50 years 0 545  545 
160,734  160,734  0 
In addition to the one-off retrospective element, an in-year saving occurs in scheduled debt repayments in 2023/24, of
£3.076m.  This will be followed by a reduction in the annual charges for a further 18 years and then the statutory charges will
continue until the end of the reprofiled debt repayment period.  Over the full asset lives the total repayment for the debt
liability remains the same.  The reprofiling of the debt liability repayments increases the Capital Financing Requirement
(CFR) by £31.186m as at 1 April 2023.  The increase in the CFR (Note 35) will reduce by the revised repayments after the
PPP and DBFM contracts have expired until the end of the revised period.  As this is a cumulative statutory adjustment there
is no prior year restatement of statutory adjustments in the Annual Accounts.
The statutory adjustment up to 31 March 2024 has the following impact on the 2023/24 Balance sheet (Capital Adjustment
Account) and Movement in Reserves statement:
Impact on Balance Sheet and
Movement in Reserves Statement
Pre
2023/24 2023/24 Total 
£m £m £m
Capital Adjustment Account 31,186  3,076  34,262 
Movement in Reserves Statement (31,186)  (3,076)  (34,262) 
37. Authorisation of Annual Accounts
The unaudited Annual Accounts were authorised for issue by the Chief Finance Officer on 24 June 2024 and the Audited
Accounts were authorised for issue on 2 December 2024.  Events taking place after this date are not reflected in the
financial statements or notes.  Where events taking place before this date provided information about conditions existing at
31 March 2024, the figures in the financial statements and notes have been adjusted in all material respects to reflect the
impact of this information.
38. Contingent Liabilities
The Council has made provision for insurance claims where appropriate and has an Insurance Fund to manage insurable
risks.  There is also a contingent liability in respect of potential insurance claims incurred but not reported which cannot be
forecast with any certainty.
There is a contingent liability relating to Municipal Mutual Insurance (MMI), who were the insurers for Tayside Regional
Council (TRC).  Following a Supreme Court judgement in November 2012 a scheme of arrangement has been put in place
where MMI will seek to recover, from the scheme members or successors, 25% (and increase from 15% applied after April
2016) of all claims paid out since 1993 on policies taken out by TRC (less an overall total reduction of £50,000).  Perth and
Kinross Council is one of the successor bodies of TRC.  
There is now a risk that the remaining assets of the TRC Insurance Fund will not be sufficient to meet all future liabilities due
to the long time horizon for certain types of claims.  
74 | Perth and Kinross Council Annual Accounts 2023/24 Page 93 of 214

Page 94

75 | Perth and Kinross Council Annual Accounts 2023/24 
The Limitation (Childhood Abuse) (Scotland) Act 2017 came into force on 4 October 2017 and removed the time limit on
raising civil court actions relating to childhood abuse.  The Council has received a small number of claims, however, it is not
possible to determine with any certainty whether there is any liability at this time until the claims are fully investigated.  In
addition, it is not possible to estimate the potential financial effect in respect of future claims the Council may receive due to
a number of uncertainties.  This includes the number of claims which may arise and the extent of compensation which could
arise.  Additionally, the extent of re-imbursement which might arise from historic or current insurance policies cannot
currently be assessed.  The Council may also receive claims in respect of Educational provision.  The national historic abuse
redress scheme launched in 2022. 
The Council has a number of contracts for the upgrade and redevelopment of buildings and infrastructure.  Claims relating to
compensation for works and land purchases for projects are currently being negotiated or refuted.
The Council operates services from a number of properties that it does not own.  In the future there may be a liability in
respect of property costs to reinstate buildings to their original specification and design.
The Council has a potential liability in respect of financial guarantees for the Tayside Pension Fund in respect of Scheduled
Bodies and Admitted Bodies should they cease to exist, withdraw from the Pension Scheme or otherwise become unable to
continue covering any unfunded liabilities.  These bodies include Tayside and Central Scotland Transport Partnership, Live
Active Leisure Ltd, Perth Theatre and Concert Hall Limited, Perth and Kinross Countryside Trust, Perth and Kinross Society
for the Blind, Perth Citizens’ Advice Bureau and Culture Perth and Kinross.  In addition the Council has a potential liability in
respect of pensions for the Convention of Scottish Local Authorities (COSLA) should the organisation cease to exist.
The Council may also have a liability pertaining to a recent court decision for both itself and a Joint Committee.  The UK
Government is undertaking a consultation on amendments following this along with other legal cases which will impact on
both the liability and the period that it may cover.
Following the issue of the Reinforced Autoclaved Aerated Concrete (RAAC) safety alert in 2019, the Council previously
carried out a review of existing building condition information which was followed up with non-invasive visual inspections
where required.  A subsequent inspection identified two sites with RAAC, one of which has been remediated.  The Council
has a robust Building Condition Survey programme in place which comprises a 5-year rolling survey programme and also
includes an annual review of survey data to monitor any changes in asset condition.  Remedial works may be required if
RAAC is found in any Council property, the financial impact of this is unknown at this time.
39. Financial Instruments
Accounting regulations require the ‘financial instruments’ (investment, lending and borrowing of the Council) shown on the
balance sheet to be further analysed into various defined categories.  The investments, lending and borrowing disclosed in
the balance sheet are made up of the following categories of ‘financial instruments’. 
31 March 31 March 31 March 31 March 31 March 31 March
2024 2023 2024 2023 2024 2023
£'000 £'000 £'000 £'000 £'000 £'000
Financial Liabilities
Financial Liabilities at amortised cost
Public works Loan Board
(PWLB) 572,000 555,000 15,775 7,576 587,775 562,576
Market Loans 44,330 44,351 0 136 44,330 44,487
Short Term Borrowing 0 0 3,623 4,402 3,623 4,402
Creditors 0 0 91,611 96,104 91,611 96,104
Total borrowings 616,330 599,351 111,009 108,218 727,339 707,569
Financial Assets
Cash and Equivalents 0 0 31,183 17,663 31,183 17,663
Investment Deposits 0 0 36,560 155,339 36,560 155,339
Other 485 481 239 449 724 930
Debtors 58 60 52,105 51,570 52,163 51,630
Total investments 543 541 120,087 225,021 120,630 225,562
Long-Term Current Total
Lender Option Borrower Option (LOBO) borrowings of £44.330 million have been included in long term borrowing as at 31
March 2024 but have a call date in the next 12 months.
The above long term figures are based on the 2016 Code which requires that in undertaking Effective Interest Rate (EIR)
calculations, the maturity period for a LOBO is taken as being the contractual period to maturity.  
75 | Perth and Kinross Council Annual Accounts 2023/24 Page 94 of 214

Page 95

76 | Perth and Kinross Council Annual Accounts 2023/24 
Financial Instruments Gains / Losses
The gains and losses recognised in the Comprehensive Income and Expenditure Account in relation to financial instruments
are as follows:
Financial Financial
Liabilities Assets
Liabilities
measured at Loans and Total Total
amortised cost receivables 2023/24 2022/23
£'000 £'000 £'000 £'000
Interest expense 22,774 0 22,774 18,366
Interest payable and similar charges 22,774 0 22,774 18,366
Interest income 0 (6,449) (6,449) (4,866)
Interest and investment income 0 (6,449) (6,449) (4,866)
Gain on revaluation (20) (1) (21) (27)
Surplus arising on revaluation of financial assets (20) (1) (21) (27)
Net loss/(gain) for the year 22,754 (6,450) 16,304 13,473
Fair Value of Liabilities Carried at Amortised Cost
The fair value of each class of financial assets and liabilities which are carried in the balance sheet as at 31 March 2024 at
amortised cost is disclosed below.  
Methods and Assumptions in valuation technique: 
The fair value of an instrument is determined by calculating the Net Present Value (NPV) of future cash flows, which
provides an estimate of the value of payments in the future in today’s terms.
The discount rate used in the NPV calculation is the rate applicable in the market on the date of valuation for an instrument
with the same structure, terms and remaining duration.  For debt, this will be the new borrowing rate since premature
repayment rates include a margin which represents the lender's profit as a result of rescheduling the loan; this is not
included in the fair value calculation since any motivation other than securing a fair price should be ignored.
In addition, lenders do not have the ability to force the Council to repay debt early.
The rates quoted in this valuation were obtained by the Council’s treasury management consultants from the market on 31
March 2024, using bid prices where applicable.
The calculations are made with the following assumptions:
• For Public Works Loans Board (PWLB) debt, the discount rates used are the rates for new borrowing as per rate
sheet number 126/24 on 28 March 2024 (pm).
• For other market debt and investments the discount rates used are the rates available for an instrument with the
same terms from a comparable lender.
• Interpolation techniques have been used between available rates where the exact maturity period was not available.
• No early repayment or impairment is recognised.
• Fair values have been calculated for all instruments in the portfolio.  
76 | Perth and Kinross Council Annual Accounts 2023/24 Page 95 of 214

Page 96

77 | Perth and Kinross Council Annual Accounts 2023/24 
The fair values are calculated as follows:
Carrying Amount Fair Value Carrying amount Fair value
£'000 £'000 £'000 £'000
Public Works Loans Board (PWLB) 587,775 345,369 562,576 354,921
Lender Option Borrower Option (LOBO) 44,330 39,037 44,351 42,427
Short-term Borrowing 1,197 1,197 2,099 2,099
Other (Special Loans) 2,426 2,426 2,303 2,303
Other Market Loans 0 0 136 136
Creditors 91,611 91,611 96,104 96,104
Financial Liabilties 727,339 479,640 707,569 497,990
31 March 2024 31 March 2023
The Fair value is significantly less than the carrying amount because the majority of the Council’s long-term portfolio of loans
are fixed rate loans where the interest rate payable is lower than the rates available for similar loans at the balance sheet
date.  The difference between the carrying amount and the fair value therefore represents the discount the Council would
receive from the lender in the event these loans were to be repaid at that date.  
For comparison, if the Council were to have repaid all the loans to the PWLB on the balance sheet date, a total of £405
million would have been payable after applying the PWLB’s premature redemption rates applicable on that date.  This is
higher than the Fair Value shown in the table above, as the PWLB premature redemption rates include an additional profit
margin over their comparative new borrowing rates.
Fair Value of Assets Carried at Amortised Cost
Carrying Amount Fair Value Carrying amount Fair value
£'000 £'000 £'000 £'000
Cash (including petty cash) 31,183 31,183 17,663 17,663
Deposits with Banks and Building Societies 36,560 36,560 155,339 155,339
Mortgages 192 192 236 236
Loans to Others 532 532 694 694
Debtors (Long and short term) 52,163 52,163 51,630 51,630
Financial Assets 120,630 120,630 225,562 225,562
31 March 2024 31 March 2023
Where the fair value is higher than the carrying amount its because the Council’s portfolio of investments includes fixed rate
deposits where the interest rate receivable is higher than rates available for similar deposits at the balance sheet date. 
Where the fair value is the same or lower than the carrying value, it’s because the interest receivable is the same or lower
than the rates on the balance sheet date, or there is only a very short time left to maturity.  For 2023/24, the fair value has
been taken as the principal amount outstanding together with accrued interest, given the short-term nature of the
instruments.
Nature and Extent of Risks Arising from Financial Instruments
The Council’s management of treasury risks is intended to minimise the Council’s exposure to the unpredictability of financial
markets and to protect the financial resources available to fund services.  The Council has fully adopted CIPFA’s Code of
Treasury Management Practices and has written principles for overall risk management as well as written policies and
procedures covering specific areas such as credit risk, liquidity risk and market risk.
(i) Credit Risk 
Credit risk arises from the short-term lending of surplus funds to banks, building societies, Money Market Funds and other
local authorities as well as credit exposures to the Council’s customers.  It is the policy of the Council to place deposits only
with a limited number of high quality banks, building societies and Money Market Funds whose credit rating, together with
other market information, is independently assessed as sufficiently secure by the Council’s treasury advisers and to restrict
lending to a prudent maximum amount and duration for each institution.  The Council’s policy also includes lending to other
local authorities in the UK.
Under the terms of the Council’s approved Treasury policy, only the highest rated banks and financial institutions are used. 
Accordingly, the expected credit loss on such deposits is deemed negligible, and no expected credit loss provision has been
provided in the Income and Expenditure account for 2023/24 (2022/23 nil) on the grounds of immateriality.  Applying historic
default rates for the counterparties used by the Council as at 31 March 2024 shows the expected credit loss to be less than
0.02% to 0.04% of the principal sums deposited, whilst the actual historic default experienced by the Council is nil.  Further,
there is no information to indicate that this position has changed since the balance sheet date.  
77 | Perth and Kinross Council Annual Accounts 2023/24 Page 96 of 214

Page 97

78 | Perth and Kinross Council Annual Accounts 2023/24 
The following analysis summarises the Council’s potential maximum exposure to credit risk, based on past experience and
current market conditions.
Historical Historical experience Estimated
Amounts at 31 experience adjusted for maximum exposure
March 2024 of default market conditions to default and
as at 31 March 2024 uncollectability
£'000 % % £'000
Deposits with banks and
other financial institutions 67,155 0 0 0
Loans to Others 724 0 0 0
Customers 15,242 9.2 9.2 1,402
Total 83,121 - - 1,402
The Council’s overall exposure to credit risk in relation to its deposits in banks and other financial institutions of £67.2m
above cannot be assessed generally, as the risk of non-payment of the principal sums or interest is specific to each
individual institution.  Experience indicates that any such non-payment is rare, and there is no evidence that any risk of
default existed at 31 March 2024.  The repayment profile of these deposits, including loans to others, is shown below:  
31 March 31 March
2024 2023
£'000 £'000
Less than three months 56,752 71,598
Three to six months 10,403 64,280
Six months to one year 0 40,136
Total 67,155 176,014
Loans to Others
The Council initiates a legal charge on property where, for example, clients require assistance with payment of care fees, but
cannot pay immediately until such time as their property is sold.  The carrying value of the total amount outstanding as at 31
March 2024 in this category is £532,000 and experience of default is minimal.  The Council has granted mortgages for
essential property repairs in shared ownership properties as well as secured loans to property owners to bring their
properties back into use for affordable rent under the Empty Home Loans Fund (EHLF) scheme.  The total amount
outstanding as at 31 March 2024 is £192,000 with no experience of default.  The total amount of Loans to Others of
£724,000 can be analysed as follows:
31 March 31 March
2024 2023
£'000 £'000
Less than three months 58 70
Three to six months 58 70
Six months to one year 123 141
More than one year 485 649
Total 724 930
Debtors
The Council does not generally allow credit for customers, such that £12.081m of the £15.242m balance is past its due date
for payment.
31 March 31 March
2024 2023
£'000 £'000
Less than three months 8,492 12,299
Three to six months 421 427
Six months to one year 1,302 1,213
More than one year 1,866 1,924
Total 12,081 15,863
78 | Perth and Kinross Council Annual Accounts 2023/24 Page 97 of 214

Page 98

79 | Perth and Kinross Council Annual Accounts 2023/24 
(ii) Liquidity Risk
The Council has access to borrowings from the money markets to cover day to day cashflow needs, as well as borrowing
from the Public Works Loans Board or money markets for longer term funding requirements.  As a result there is no
significant risk that the Council will be unable to raise finance to meet its commitments under financial instruments.  The
Council manages its portfolio in conjunction with interest rate forecasts to reduce the risk of a large proportion of its
borrowing maturing at a time of higher interest rates, and so reduce the financial impact of re-financing at an unfavourable
time.  In addition, the monitoring of interest rate movements for the identification of debt rescheduling opportunities to amend
the maturity profile, as well as achieving savings in interest charges, is undertaken on a continuous basis to further mitigate
any refinancing risks.
The maturity structure of financial liabilities is as follows (at nominal value):
Loans outstanding 31 March 31 March
2024 2023
£'000 £'000
Public Works Loans Board 585,000 560,000
Market debt 43,200 43,340
Temporary borrowing 1,152 2,060
Local bonds 2,415 2,294
Bank overdraft 0 3,067
Total 631,767 610,761
Less than 1 year 16,567 12,561
Between 1 and 2 years 5,000 13,000
Between 2 and 5 years 25,000 20,000
Between 5 and 10 years 37,500 17,500
Between 10 to 15 years 5,000 5,000
More than 15 years 542,700 542,700
Total 631,767 610,761
In the more than 15 years category there are £43.2 million of LOBO borrowings which have a call date in the next 12
months.
(iii) Market Risk
Interest rate risk
The Council is exposed to interest rate risk in two different ways: the first being the uncertainty of interest paid/received on
variable rate instruments and the second being the effect of fluctuations in interest rates on the fair value of an instrument.
The current interest rate risk for the council is summarised below:
• Reductions in interest rates will affect interest earned on variable rate investments, and reduces income credited to
the Comprehensive Income and Expenditure Statement.  There would only be a small reduction in the interest
payable on variable rate borrowing.  
• Increases in interest rates will affect interest paid on variable rate borrowings, and increases the interest expense
charged to the Comprehensive Income and Expenditure Statement, but is offset by increased investment returns.  
• The fair value of fixed rate financial assets will fall if interest rates rise.  This will not impact the balance sheet for
assets held at amortised cost, but will impact the disclosure note for fair value.  It would have a negative effect on the
balance sheet for any assets held at fair value in the balance sheet, which would also be reflected in the
Comprehensive Income and Expenditure Statement.  However, no such assets at fair value were held by the Council
as at 31 March 2024.  
• The fair value of fixed rate financial liabilities will rise if interest rates fall.  This will not impact the balance sheet for
liabilities held at amortised cost, but will impact the disclosure note for fair value.  
The Council has a number of strategies for managing interest rate risk.  The policy is to keep a maximum of 35% of its
borrowings in variable rate loans.  During periods of falling interest rates, and where economic circumstances make it
favourable, fixed rate loans may be repaid early to limit exposure to higher costs, whilst fixed deposits may be undertaken
for longer periods (within policy and counterparty limits).  
The treasury management team has an active strategy for assessing interest rate exposure that feeds into the setting of the
annual budget and which is used to update the budget throughout the year.  This allows any favourable or adverse changes
to be accommodated.  The analysis will also advise whether new borrowing taken out is fixed or variable.  
79 | Perth and Kinross Council Annual Accounts 2023/24 Page 98 of 214

Page 99

80 | Perth and Kinross Council Annual Accounts 2023/24 
According to this assessment strategy, at 31 March 2024, if interest rates had been 1% higher with all other variables held
constant, the financial effect would be:
£'000
Increase in interest payable on variable rate borrowings 468
Increase in interest rate receivable on variable rate investments (1,071)
Impact on Comprehensive Income and Expenditure Statement (603)
Share of overall impact credited to the HRA (139)
The impact of a 1% fall in interest rates would have been an estimated cost of £1.071 million to the Council as a result of a
reduction in investment income, whilst it would be unlikely that the lenders of the market loans borrowed would pass on the
reduction in rates payable.  However, there would be a reduction of £36,000 payable on other loans.  Therefore, the net cost
of a 1% fall in interest rates would be £1.035 million of which £238,000 would be debited to the HRA.
Foreign Exchange Risk
The Council has no financial assets or liabilities denominated in foreign currencies and thus has no exposure to loss arising
from movements in exchange rates.  
Price Risk
The Council does not invest in equities, however, does invest in other tradable instruments but with the intention of holding
them until their maturity date.  Therefore, the Council does not actively trade in such instruments, and is therefore not
exposed to gains or losses on movements in their price.
40. Devolved School Management (DSM) Schools
The accumulated balance on the General Fund at 31 March 2024 includes net surplus funds of £501,000 (31 March 2023
£722,000) in respect of schools participating in the Devolved School Management scheme.  There are no schools carrying
forward deficits.  These surpluses are earmarked in 2023/24 for the individual schools concerned.
There is Pupil Equity Funding from the Scottish Government of £116,000 which is being carried forward to 2024/25 for
schools within the Council’s earmarked general fund balances.
41. Operating Activities
The cash flows for operating activities include the following items:
2023/24 2022/23
£'000 £'000
Interest received (7,191) (2,831)
Interest paid 28,154 26,434
20,963 23,603
42. Investing Activities
2023/24 2022/23
£'000 £'000
Purchase of property, plant and equipment, investment property and intangible assets (158,781) (120,483)
Purchase of short-term and long-term investments (69,560) (205,839)
Proceeds from the sale of property, plant and equipment, investment property and
intangible assets 1,840 1,047
Proceeds of short-term and long-term investments 188,339 259,801
Other receipts for investing activities 46,429 42,656
8,267 (22,818)
80 | Perth and Kinross Council Annual Accounts 2023/24 Page 99 of 214

Page 100

81 | Perth and Kinross Council Annual Accounts 2023/24 
43. Financing Activities
2023/24 2022/23
£'000 £'000
Cash receipts of short and long-term borrowing 66,065 29,697
Cash payments for the reduction of the outstanding liabilities relating to fiannce leases and
on balance sheet PFI contracts (6,287) (5,864)
Repayments of short and long-term borrowing (40,582) (37,056)
19,196 (13,223)
44. Cash and Cash Equivalents
The balance of cash and cash equivalents is made up of the following elements:
2023/24 2022/23
£'000 £'000
Cash held 47 55
Bank current accounts 542 (3,067)
Short-term deposits with banks and building societies 9 3,651
Short-term deposits with Local Authorities 29,529 14,017
Short-term deposits with other organisations 1,056 3,007
Total cash and cash equivalents 31,183 17,663
45. Trust Funds
Perth and Kinross Council administers a number of Charitable Funds of varying sizes.  The Income and Expenditure
Account and Balance Sheet are detailed on page 91.
These funds include Educational Trusts and other trusts which are primarily for the residents of Perth and Kinross.  An
exercise is currently being undertaken to amalgamate many of the non-educational trusts in order for the funds to be more
readily accessible.
The Perth and Kinross Educational Trust gives financial assistance towards scholarships, second or subsequent degrees,
mature students and further education.  Assistance is also provided to schools for sports facilities and special equipment,
promoting visual arts and education in music and drama.  There are also preferences for certain beneficiaries usually named
schools for prizes etc.  Also, within the Perth and Kinross Educational Trust there are eight individual endowments for
maintaining, furnishing and equipping school buildings.
The other charitable trusts purposes include providing financial assistance in different areas of Perth and Kinross.
31 March 31 March
2024 2023
£'000 £'000
Educational Trust - Financial Assistance
Net Assets 1,058 983
Net Incoming/(Outgoing) Resources before other recognised gains and losses 11 10
Educational Trust - Endowments
Net Assets 48 49
Other Charitable Trusts
Net Assets 2,617 2,429
Net Incoming Resources before other recognised gains and losses 48 3
Total Net Assets 3,723 3,461
Total Net Incoming Resources before other recognised gains and losses 59 13
Detailed Accounts for the Charities are available from the Chief Finance Officer, 2 High Street, Perth, PH1 5PH by contacting
chxfinance@pkc.gov.uk or phoning 01738 475000.  
81 | Perth and Kinross Council Annual Accounts 2023/24 Page 100 of 214

Page 101

82 | Perth and Kinross Council Annual Accounts 2023/24 
46. The Statutory Loans Fund
Loans Fund accounting is governed by The Local Authority (Capital Financing and Accounting) (Scotland) Regulations 2016,
which came into force on 1 April 2016.  These regulations outline the way the Loans Fund is operated in relation to the
repayment period and method that capital advances (expenditure) are repaid (charged) on an annual basis.
The Loans Fund is an internal fund operated by the Council to manage the amortisation of capital expenditure (capital
advances) over the life of the various assets being funded by borrowing, and also to manage the external borrowing raised
to finance the capital expenditure.  Whilst both elements of the Loans Fund operate independently of each other, because
they are based on the same capital plans, they will broadly be consistent to each other over the long term.  However,
significant differences may arise over the short-term.  This may include, for example, delaying external borrowing due to
unfavourable prevailing interest rates, where the Council’s daily cashflow remains positive, or where the Council has
significant levels of Reserves.
The annuity repayment method is used for all internal capital advances through the Loans Fund.  The Council also defers
the repayment of Loans Fund advances until the asset being funded is completed and operational.  The Council
repays/amortises the capital advances over the life of the asset being funded, up to a maximum of 50 years.  Therefore, the
total number of years may exceed 50 years from the year the capital expenditure was incurred where the total expenditure
on an asset is spread over two or more years before the asset becomes operational. 
The value of Loans Fund advances outstanding at 31 March 2024 is £667.120 million.  This is made up as follows:
Advances Debt Repaid Net Advances Advances
1 April 2023 Transferred 2023/24 2023/24 31 March 2024
£'000 £'000 £'000 £'000 £'000
General Fund 379,820 0 (2,671) 97,205 474,354
Prudential Borrowing 45,331 0 (2,853) 4,123 46,601
Sub Total 425,151 0 (5,524) 101,328 520,955
HRA 132,627 0 (3,448) 16,986 146,165
Total 557,778 0 (8,972) 118,314 667,120
The estimated future repayments of these advances is summarised in the table below:
General Fund Prudential Sub Total: HRA Total
Borrowing General Fund 31 March 2024
£'000 £'000 £'000 £'000 £'000
Within 1 year 2,844 2,800 5,644 1,768 7,412
Between 1 and 2 years 2,293 2,792 5,085 1,977 7,062
Between 2 and 5 years 6,902 6,305 13,207 7,169 20,376
Between 5 and 10 years 14,592 5,838 20,430 25,171 45,601
Between 10 and 15 years 22,536 4,600 27,136 20,990 48,126
between 15 and 20 years 32,756 3,721 36,477 12,452 48,929
Between 20 and 25 years 43,987 4,000 47,987 7,128 55,115
More than 25 years 348,444 16,545 364,989 69,510 434,499
Total 474,354 46,601 520,955 146,165 667,120
Comparison of the outstanding capital advances above with the Council’s long-term external debt demonstrates that actual
capital expenditure funded by borrowing is higher than the actual borrowing undertaken to date by around £38.9 milllion. 
This reflects the strategy adopted in recent years of deferring new borrowing whilst rates were at high levels, and applying
maturing investment balances to meet immediate cashflow requirements.  New borrowing would only be undertaken when
there were insufficient available balances.  The Council started the year in an “over-borrowed” position of around £45 million,
whilst the position at the end of the year reflects an “under-borrowed” position of £38.9 million, highlighting the strategy of
deferring borrowing where possible.  It should also be noted that the Council has approved a significant borrowing
requirement over the next 6 years on its Capital programmes.
The Council approved its new Composite Capital Budget to 2029/30 on 28 February 2024 (Report No. 24/64 refers), whilst
the Housing and Social Wellbeing Committee approved the HRA Capital Investment Programme to 2028/29 on 24 January
2024 (Report No. 24/24 refers).  The last report to the Finance and Resources Committee on 24 April 2024 (Report No.
24/131 refers) approved adjustments to these Programmes. 
82 | Perth and Kinross Council Annual Accounts 2023/24 Page 101 of 214

Page 102

83 | Perth and Kinross Council Annual Accounts 2023/24 
The latest approved General Fund (Composite) Capital Budget and Housing Investment Programme includes the amount of
capital expenditure to be funded by borrowing (i.e. new Loans Fund advances) in each of the next 6 years as follows:
General Housing Total
Fund Investment
Programme
£'000 £'000 £'000
2024/25 169,923 19,703 189,626
2025/26 74,024 17,864 91,888
2026/27 81,816 13,629 95,445
2027/28 100,221 17,720 117,941
2028/29 19,739 17,704 37,443
2029/30 16,222 0 16,222
Total 461,945 86,620 548,565
All the above Loans Fund repayments have been included in the Loan Charge estimates within the approved Medium-Term
Financial Plans, and therefore remain affordable under the current Loan Charge Budget strategy.  This also includes
estimates of new borrowing for the years beyond 2029/30.   
83 | Perth and Kinross Council Annual Accounts 2023/24 Page 102 of 214

Page 103

2022/23
£'000 £'000 £'000 £'000
Income
(30,334) Dwelling Rents (31,128)
587 less Voids 574
(30,554)
(578) Non-Dwelling Rents (596)
41 less Voids 42
(554)
(1,110) Other Income (2,399)
(31,394) Total Income (33,507)
Expenditure
7,638 Repairs and Maintenance 7,640
15,229 Supervision and Management 16,135
13,427 Depreciation, impairment and revaluation losses on non current assets 19,263
(118) Movement in the Impairment of Debtors 3
667 Other expenditure 448
36,843 Total Expenditure 43,489
5,449 Net Expenditure for HRA Services as included in the
Comprehensive Income and Expenditure Statement
9,982
318 HRA services' share of Corporate and Democratic Core 305
5,767 Net Expenditure for HRA Services 10,287
HRA share of the operating income and expenditure included
in the Comprehensive Income and Expenditure Statement:
534 (Gain) / Loss on sale of HRA Non-Current Assets (3)
3,356 Interest payable and similar charges 3,756
(136) Interest and investment income (284)
94 Net Interest on the net defined benefit liability (68)
(3,214) Capital Grants and Contributions Receivable (3,787)
6,401 Deficit for the year on HRA services 9,901
HOUSING REVENUE ACCOUNT INCOME AND EXPENDITURE STATEMENT
2023/24
The Housing Revenue Account (HRA) Income and Expenditure Statement shows the economic cost in the year of
providing housing services in accordance with generally accepted accounting practices, rather than the amount to
be funded from rents and government grants.  Councils charge rents to cover expenditure in accordance with the
legislative framework which may be different from the accounting cost.  The increase or decrease in the year, on the
basis on which rents are raised, is shown in the Statement of Movements on the Housing Revenue Account
84 | Perth and Kinross Council Annual Accounts 2023/24 Page 103 of 214

Page 104

2022/23
£'000 £'000 £'000
(3,282) Balance on the HRA at the end of the Previous Year (2,647)
6,401 Deficit for the year on the HRA Income and Expenditure Account 9,901
(2,897) Adjustments to Usable reserves permitted by Statute (7,157)
(2,029) (2,357)
1,475 Net Decrease before Transfers to or from Reserves 387
(840) Transfer from Reserves 0
635 Movement in Year on the HRA 387
(2,647) Balance on the HRA at the end of the Current Year (2,260)
Note to the Statement of Movement on the HRA Balance
2022/23
£'000 £'000 £'000
(534) Gain/(Loss) on sale of HRA Non-current assets 3
(10,530) Depreciation and impairment of non current assets (14,316)
0 Revaluation Loss (2,590)
Capital Grants and Contributions credited to the Comprehensive Income and Expenditure
3,214 Statement 3,787
(16) Adjustments involving Short Term Accumulated Absences Account 28
Reversal of items relating to retirement benefits credited to the Comprehensive Income
(3,149) and Expenditure Statement (1,478)
(11,015) (14,566)
1,436 1,479
year
163 Adjustments involving the Financial Instruments Adjustment Account 147
3,999 Statutory provision for the repayment of debt 3,448
3,388 Capital expenditure charged to the HRA balances 2,335
8,986 7,409
(2,029) (7,157)
STATEMENT OF MOVEMENTS ON THE HOUSING REVENUE ACCOUNT BALANCE
Net additional amount required by statute to be (credited) to the HRA Balance for
the year
Employer's pension contributions and direct payments to pensioners payable in the
Adjustments between Accounting Basis and Funding Basis Under Statute
Items included in the HRA Income and Expenditure Account but excluded from the
movement on HRA Balance for the year
Items not included in the HRA Income and Expenditure Account but included in the
movement on HRA Balance for the year
2023/24
2023/24
The Statement of Movement on the Housing Revenue Account balance reconciles the Housing Revenue Account to the
HRA balance, an earmarked element of the Council’s General Fund Balance.
85 | Perth and Kinross Council Annual Accounts 2023/24 Page 104 of 214

Page 105

THE ACCOMPANYING NOTES TO THE HOUSING REVENUE ACCOUNT INCOME AND EXPENDITURE
STATEMENT
Restated
1. Housing Stock at 31 March 2024 No. of Dwellings No. of Dwellings
31 March 2024 31 March 2023
Sheltered accommodation 285 285
Detached/Semi-Detached/Terraced 3,865 3,827
High Rise Flats 146 143
Tenement Flats/Other Flats/Maisonettes 3,757 3,705
Total 8,053 7,960
2. Rent Arrears at 31 March 2024 Gross Arrears Gross Arrears
31 March 2024 31 March 2023
£'000
% of
Income £'000
% of
Income
Houses 2,994 9.6 3,217 10.6
Other Subjects 56 9.4 52 9.0
Totals 3,050 9.6 3,269 10.6
3. Impairment of Debtors
impairment in 2022/23.
In 2023/24 an impairment of £1.845 million has been provided in the Balance Sheet, an increase of £3,340 from the
86 | Perth and Kinross Council Annual Accounts 2023/24 Page 105 of 214

Page 106

2022/23 2023/24
£'000 £'000 £'000
113,489 Gross Charge 119,476
(3,688) Deduct - Exemptions (3,903)
(182) Disabled Relief (195)
(8,350) Discounts and Reductions (8,788)
(6,966) Council Tax Reduction Scheme (7,431)
94,303 Net Council Tax 99,159
Deduct -
(7) Ministry of Defence Properties (7)
7 Contribution Received 7
0
(1,045) Provision for  Bad and Doubtful Debts (1,607)
93,258 Total Council Tax Income 97,552
(398) Adjustments for prior years for Council Tax (204)
92,860 Total Council Tax Income to Comprehensive I and E Statement 97,348
COUNCIL TAX INCOME ACCOUNT
The Council Tax Income Account shows the gross income raised from Council Taxes levied and deductions made under
statute. The resultant net income is transferred to the Comprehensive Income and Expenditure Statement of the Council.
87 | Perth and Kinross Council Annual Accounts 2023/24 Page 106 of 214

Page 107

THE ACCOMPANYING NOTES TO THE COUNCIL TAX INCOME ACCOUNT
1.  CALCULATION OF THE COUNCIL TAX BASE AT 31 MARCH 2024
2023/24 2022/23
A B C D E F G H TOTAL TOTAL
No. of Properties 8,744 15,047 13,024 11,824 12,235 8,334 6,701 709 76,618 75,884
Exemptions (766) (707) (519) (342) (268) (132) (107) (20) (2,861) (2,791)
Disabled Relief 72 19 15 30 (42) (9) (81) (4) 0 0
Discounts (1,408) (2,027) (1,494) (1,185) (961) (503) (314) (62) (7,954) (7,870)
Effective No. of Properties 6,642 12,332 11,026 10,327 10,964 7,690 6,199 623 65,803 65,223
Ratio 240/360 280/360 320/360 360/360 473/360 585/360 705/360 882/360
Band D Equivalents 4,425 9,592 9,801 10,327 14,405 12,496 12,140 1,526 74,712 73,982
Contributions in lieu 7 7
TOTAL 74,719 73,989
Provision for non-payment at 2.0% (1,494) (1,480)
COUNCIL TAX BASE 73,225 72,509
2.  THE COUNCIL TAX CHARGE
Fraction 2023/24 2022/23
Valuation of Actual Actual
Band band D Charge Charge
A 240/360 £935.79 £900.67
B 280/360 £1,091.75 £1,050.78
C 320/360 £1,247.72 £1,200.89
D 360/360 £1,403.69 £1,351.00
E 473/360 £1,844.29 £1,775.06
F 585/360 £2,280.99 £2,195.38
G 705/360 £2,748.89 £2,645.71
H 882/360 £3,439.04 £3,309.95
Range
The valuation bands, the fractions used in calculating the Council Tax payable for each valuation band and the actual charges determined for
2023/24 are set out below:
Each property is placed in one of eight valuation bands (A-H) in accordance with their value as at 1 April 1991. The Council Tax charge levied for
each property is calculated in proportion to the Council Tax charge for a band D property by applying fractions. A discount of 25% is given where
there are fewer than two residents of a property. Discounts of 10% are awarded for second homes and long term empty dwellings. Some
unoccupied dwellings may receive discount of 50%. Persons in detention, students, mentally handicapped people and certain others are
disregarded for Council Tax purposes.  Reductions in Council Tax are also granted for disabled people.
The Council Tax is based on the value of a domestic property together with a personal element which takes into account the number and
circumstances of that property's occupants.
Property
Valuation
Over £212,000
£0 - £27,000
£27,001 - £35,000
£45,001 - £58,000
£35,001 - £45,000
£106,001 - £212,000
£80,001 - £106,000
£58,001 - £80,000
88 | Perth and Kinross Council Annual Accounts 2023/24 Page 107 of 214

Page 108

2022/23
£'000 £'000 £'000
81,902 Gross Rate Levied 87,269
0 Transitional Relief (2,735)
84,534
Deduct:
(2,682) Rate Rebates (2,889)
(21,664) Reliefs, Charities etc. (18,936)
(256) Provision for Bad and Doubtful Debts (436)
(22,261)
Adjustments to Previous Years:
(1,202) Gross Rate Levied (594)
0 Transitional Surcharge/Relief 10
(291) Reliefs, Charities etc. (204)
(154) Impairment for Bad and Doubtful Debts and Abatements (571)
(1,359)
55,653 Net Non-Domestic Rate Income- 60,914
(55,877) Contribution to National Non-Domestic Rate Pool (62,378)
46,141 Contribution from National Non-Domestic Rate Pool 60,754
(9,736) Net contribution to National Non-Domestic Rate Pool (1,624)
45,917 Total Non-Domestic Rate Income to Comprehensive Income 59,290
and Expenditure Statement
224 Discretionary Relief funded by the Council 1,464
2023/24
NON-DOMESTIC RATE INCOME ACCOUNT
The Non-Domestic Rate Account is an agent's statement that reflects the statutory obligation for billing
authorities to maintain a separate Non-Domestic Rate Account. The statement shows the gross income from
the rates and deductions made under statute. The net income is paid to the Scottish Government as a
contribution to the national Non-Domestic Rate pool.
89 | Perth and Kinross Council Annual Accounts 2023/24 Page 108 of 214

Page 109

THE ACCOMPANYNG NOTES TO THE NON-DOMESTIC RATE INCOME ACCOUNT
1.  NON-DOMESTIC RATES
2.  RATEABLE SUBJECTS AND VALUES
Rateable Rateable
No. of Value No. of Value
Subjects £'000 Subjects £'000
at 1 April 2022 at 1 April 2022 at 1 April 2023 at 1 April 2023
1,699 36,564 Shops 1,695 34,527
85 1,741 Public Houses 79 1,656
1,096 13,843 Offices (including banks) 1,056 13,487
227 12,708 Hotels etc. 212 14,744
1,781 24,353 Industrial Subjects etc. 1,769 26,017
1,950 11,842 Leisure, Entertainment, Caravans etc. 1,934 14,189
151 4,822 Garages and Petrol Stations 151 5,147
59 1,352 Cultural 59 1,471
1,362 2,663 Sporting Subjects 1,401 3,373
118 15,273 Education and Training 120 16,452
420 7,795 Public Service Subjects 420 8,811
1 0 Communications 1 0
22 331 Quarries, Mines etc. 23 536
2 3,412 Petrochemical 2 4,165
240 1,654 Religious 237 1,906
117 6,390 Health, Medical 117 6,343
728 1,988 Other 745 2,309
64 3,347 Care Facilities 62 3,580
30 98 Advertising 29 95
92 10,568 Undertaking 94 12,677
10,244 160,744 Total 10,206 171,485
Non-Domestic Rates Income is set and pooled nationally but generated and collected locally by Scottish Local Authorities.
It is distributed back to those local authorities through a distribution formula agreed with COSLA as part of the local
government finance settlement, therefore it bears no direct relationship to the amounts collected by those authorities. The
rate poundage set by the Scottish Government for 2023/24 was 49.8p (unchanged from 2022/23). 
The Small Business Bonus Scheme, introduced from 1 April 2008, provides relief to businesses based on their combined
rateable value.  Significant changes were made from 1 April 23; the combined rateable value threshold remained at
£35,000 with relief now available on all individual properties with a rateable value of £20,000 or less.  Subject to eligibility,
this provides 100% relief where the rateable value is £12,000 or less and a tapered award where the rateable value is
greater than £12,000.  Awards totalling almost £9.2 million were provided to businesses within the Perth and Kinross area
in 2023/24.
A supplement of 1.3p was charged on properties with a rateable value of between £51,001 and £100,000 and a
supplement of 2.6p was charged on properties with a rateable value exceeding £100,000 to contribute towards the
additional cost of the Small Business Bonus scheme. (The upper level having increased from £95,000 in 2022/23).
90 | Perth and Kinross Council Annual Accounts 2023/24 Page 109 of 214

Page 110

91 | Perth and Kinross Council Annual Accounts 2023/24 
Charitable Trusts
The Council administers Perth and Kinross Educational Trust and various other Charitable Trusts and Endowments.  The
figures below summarise the aggregate income and expenditure for the year and the assets and liabilities at 31 March 2024. 
2023/24 2023/24 2022/23
£'000 £'000 £'000
Incoming Resources
Income resources from generated funds:
Investment income 163 146
Total Incoming Resources 163 146
Resources Expended
Costs of generating funds:
Investment management costs 16 16
Charitable activities 75 103
Governance costs 13 14
Total Resources Expended 104 133
59 13
Other Recognised Gains:
Gain/(losses) on Investment Assets 203 (162)
Net Movement in Funds for the Year 262 (149)
Reconciliation of Funds 3,461 3,610
Total Funds Brought Forward
Total Funds Carried Forward 3,723 3,461
INCOME AND EXPENDITURE ACCOUNT FOR YEAR TO 31 MARCH 2024
Net Incoming Resources before other Recognised Gains and Losses
2023/24 2023/24 2022/23
£'000 £'000 £'000
Fixed Assets
Tangible Assets 80 80
Investments 3,271 3,083
3,351 3,163
Current Assets
Debtors 7 28
Investments - Amounts due by Perth and Kinross Council
Loans Fund 374 288
381 316
Liabilities
Creditors: amounts falling due within one year (9) (18)
Net Current Assets 372 298
Net Assets 3,723 3,461
Total Funds 3,723 3,461
BALANCE SHEET AS AT 31 MARCH 2024
Notes to Charitable Trusts
1. The market value of Investments at 31 March 2024 was £3.271 million (31 March 2023 £3.083 million).
2. The unaudited accounts were issued on 24 June 2024 and the audited accounts were authorised for 
issue on 2 December 2024. 
Scott Walker CPFA
Chief Finance Officer
Date:   
91 | Perth and Kinross Council Annual Accounts 2023/24 Page 110 of 214

Page 111

92 | Perth and Kinross Council Annual Accounts 2023/24 
Common Good
The Council administers the Common Good Accounts for ten former burghs within Perth and Kinross.  The figures below
summarise the aggregate income and expenditure for the year and detail the Assets and Liabilities at 31 March 2024.
2023/24 2023/24 2022/23
£'000 £'000 £'000
Expenditure
Grants to Voluntary Organisations 167 110
Christmas Lighting 100 73
Property Costs 5 0
Supplies and Services 17 21
289 204
Income
Rents, Fees, Charges etc. 279 311
Interest on Loans 114 39
Other 8 3
401 353
Operating Surplus for the Year 112 149
Surplus Brought Forward 2,258 2,109
Accumulated Surplus at 31 March 2,370 2,258
INCOME AND EXPENDITURE STATEMENT FOR YEAR TO 31 MARCH 2024
2023/24 2023/24 2022/23
£'000 £'000 £'000
Fixed Assets
Property, Plant and Equipment 5,315 5,383
Current Assets
Debtors 16 9
Investments 2,340 2,219
Cash and Cash Equivalents 410 453
2,766 2,681
Current Liabilities
Creditors and Accruals (106) (134)
Total Net Assets 7,975 7,930
Reserves
Revenue 2,370 2,258
Capital 477 477
Revaluation Reserve 5,128 5,195
7,975 7,930
BALANCE SHEET AS AT 31 MARCH 2024
The unaudited accounts were issued on 24 June 2024 and the audited accounts were authorised for 
issue on 2 December 2024. 
Scott Walker CPFA
Chief Finance Officer
Date:   
92 | Perth and Kinross Council Annual Accounts 2023/24 Page 111 of 214

Page 112

93 | Perth and Kinross Council Annual Accounts 2023/24 
The Accompanying Notes to the Common Good Accounts
1. The use of common good assets is accounted for on a risk and rewards based approach.  The Council General Fund or
Housing Revenue Account will meet the day-to-day operating costs of the property, and any repairs or improvement
works required to the property, in return for the use of the common good asset for the delivery of Council services.  No
rent for the use of the property is payable to the Common Good Fund on the basis that the Fund benefits from the
Council expenditure incurred in maintaining and upgrading the sites.  No expenditure is charged to the Common Good
Fund for the Council expertise in managing the assets.
In respect of common good sites that are leased out to a party external to the Council, the tenant will bear the
responsibility for the upkeep of the property.  The Common Good Fund is, therefore, credited with the annual rental
income arising from the lease agreement. 
2. Depreciation
Depreciation on Common Good Funds is charged on buildings, based on current value less residual value over the
remaining useful life of the property.  The buildings have a life expectancy of over 50 years and depreciation has been
charged on a straight line basis over that period.
3. Common Good Reserve Funds
Surplus /
Balance at (Deficit) Balance at
1 April 2023 2023/24 31 March 2024
Fund: £'000 £'000 £'000
Perth City 1,600 109 1,709
Aberfeldy 125 3 128
Abernethy 1 0 1
Alyth 20 0 20
Auchterarder 309 (7) 302
Blairgowrie 20 0 20
Crieff 15 0 15
Kinross 161 5 166
Pitlochry 7 2 9
Total 2,258 112 2,370
Coupar Angus Common Good Fund has a nil balance for both years. 
4. Common Good Fixed Assets
The Community Empowerment (Scotland) Act 2015 requires the Council to establish and maintain a list of property which
is held as part of the Common Good.  The review of property titles to facilitate the publication of the list has been
completed, and following a period of public consultation, the findings are now available on the Perth and Kinross Council
Citizen Space website at Draft Common Good Land Register. 
The review of moveable Common Good property has commenced and is expected to complete in 2024/25.  
93 | Perth and Kinross Council Annual Accounts 2023/24 Page 112 of 214

Page 113

Restated Restated
Authority's Authority's
General Housing Capital Insurance Capital Capital Total Unusable TOTAL share of share of TOTAL
Fund Revenue Fund Fund Receipts Grants Usable Reserves Authority subsidiaries associates Reserves
Balance Account Reserve Unapplied Reserves Reserves and managed and joint
funds ventures
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 1 April 2022 (85,900) (3,282) (24,817) (1,366) (2,556) (87) (118,008) (623,763) (741,771) (22,036) (13,824) (777,631)
Movement in reserves during
2022/23
Total Comprehensive Income
and Expenditure 16,868 6,401 0 0 0 0 23,269 (148,700) (125,431) (8,509) 5,090 (128,850)
Adjustments to Usable Reserves
permitted by accounting
standards (4,511) (2,897) 0 0 0 0 (7,408) 7,408 0 0 0 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis 1,514 (2,029) 0 0 311 0 (204) 204 0 0 0 0
(Increase)/Decrease in 2022/23 13,871 1,475 0 0 311 0 15,657 (141,088) (125,431) (8,509) 5,090 (128,850)
Transfers to/(from) Other
Statutory Reserves 2,306 (840) (1,526) 60 0 0 0 0 0 0 0 0
Balance at 31 March 2023
carried forward (69,723) (2,647) (26,343) (1,306) (2,245) (87) (102,351) (764,851) (867,202) (30,545) (8,734) (906,481)
Movement in reserves during
2023/24
Total Comprehensive Income
and Expenditure 41,392 9,901 0 0 0 0 51,293 (23,807) 27,486 969 3,293 31,748
Adjustments to Usable Reserves
permitted by accounting
standards (6,454) (2,357) 0 0 0 0 (8,811) 8,811 0 0 0 0
Adjustments from income and
expenditure charged under the
accounting basis to the funding
basis (19,833) (7,157) 0 0 143 0 (26,847) 26,847 0 0 0 0
Adjustment to the statutory
repayment of debt for service
concession arrangements -
permitted flexibility (34,262) 0 0 0 0 0 (34,262) 34,262 0 0 0 0
(Increase) or Decrease in
2023/24 (19,157) 387 0 0 143 0 (18,627) 46,113 27,486 969 3,293 31,748
Transfers to/(from) Other
Statutory Reserves 5,086 0 (4,683) (403) 0 0 0 0 0 0 0 0
Balance at 31 March 2024
carried forward (83,794) (2,260) (31,026) (1,709) (2,102) (87) (120,978) (718,738) (839,716) (29,576) (5,441) (874,733)
The Group Movement in Reserves Statement has been restated in terms of presentation for the Authority's share of subsidiaries and managed funds to include Common Good
and Charities previously included in the Authority's share of associates and joint ventures.
GROUP MOVEMENT IN RESERVES STATEMENT
94 | Perth and Kinross Council Annual Accounts 2023/24 Page 113 of 214

Page 114

2022/23
Net Note Gross Income Net
Expenditure Expenditure Expenditure
£'000 £'000 £'000 £'000
SERVICES
204,343 Education and Children's Services 267,197 (31,060) 236,137
88,314 Health and Social Care 199,468 (110,826) 88,642
91,723 Communities 159,123 (46,869) 112,254
44,885 Corporate and Democratic Services 64,129 (24,464) 39,665
2,894 Chief Executives Service 4,707 (56) 4,651
5,449 Housing Revenue Account 43,489 (33,507) 9,982
1,338 Valuation Joint Board 1,436 0 1,436
133 Charitable Trusts 104 0 104
(110) Common Good 289 (287) 2
438,969 COST OF SERVICES 739,942 (247,069) 492,873
143 Other Operating Expenditure / Income 0 (944) (944)
20,214 Financing and Investment Income and Expendtiure 4 25,608 (7,505) 18,103
(432,699) Taxation and Non-Specific Grant Income 0 (458,048) (458,048)
26,627 Deficit  on Provision of Services 765,550 (713,566) 51,984
9,790 Share of the (Surplus)/Deficit on the provision of services by
Associates and Joint Ventures 3,931
36,417 Group Deficit 55,915
(86,473) Surplus on revaluation of non current assets (23,936)
(74,297) Remeasurement of the net defined benefit liability/asset 632
9 Other gains and losses (225)
(4,506) Share of the other comprehensive income and expenditure of
Associates and Joint Ventures (638)
(165,267) Other Comprehensive Income and Expenditure (24,167)
(128,850) Total Comprehensive Income and Expenditure 31,748
2023/24
GROUP COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT
95 | Perth and Kinross Council Annual Accounts 2023/24 Page 114 of 214

Page 115

31 March 2023 Notes 31 March 2024
£'000 £'000
1,437,497 Property, Plant and Equipment 1,527,977
51,814 Heritage Assets 51,814
15,015 Investment Property 14,715
963 Intangible Assets 348
403 Assets Held for Sale 0
3,083 Long Term Investments 5 7,463
8,805 Investment in Joint Venture 5,441
541 Long Term Debtors 543
1,518,121 Long Term Assets 1,608,301
157,558 Short Term Investments 5 38,900
273 Assets Held for Sale 676
508 Inventories 751
54,212 Short Term Debtors 6 54,795
27,517 Cash and Cash Equivalents 36,456
240,068 Current Assets 131,578
Cash and Cash Equivalents
(12,114) Short Term Borrowing (19,398)
(98,608) Short Term Creditors 7 (94,817)
(295) Provisions (1,668)
(111,017) Current Liabilities (115,883)
(5,312) Provisions (3,564)
(599,351) Long Term Borrowing (616,330)
(71) Liabilities in associates and joint ventures 0
(135,957) Other Long Term Liabilities (129,369)
(740,691) Long Term Liabilities (749,263)
906,481 NET ASSETS 874,733
102,351 Usable Reserves 120,978
764,851 Unusable Reserves 718,738
27,888 Group Reserves 23,319
11,391 Charitable and Common Good Reserves 11,698
906,481 TOTAL RESERVES 874,733
The accompanying notes form an integral part of these financial statements.
Scott Walker CPFA
Chief Finance Officer
Date:
GROUP BALANCE SHEET
The Unaudited Annual Accounts were issued on 24 June 2024 and the Audited Annual Accounts were authorised
for issue on 2 December 2024.
96 | Perth and Kinross Council Annual Accounts 2023/24 Page 115 of 214

Page 116

2022/23 Notes 2023/24
£'000 £'000
(26,627) Deficit on the provision of services (51,984)
85,234
Adjustments to net surplus or deficit on the provision of services for non
cash movements 86,989
(44,143)
Adjustments for items included in the net surplus or deficit on the
provision of services that are investing and financing activities (49,490)
14,464 Net cash flows from Operating Activities (14,485)
(23,696) Investing Activities 10 4,228
(13,263) Financing Activities 11 19,196
(22,495) Net increase/(decrease) in cash and cash equivalents 8,939
50,012 Cash and cash equivalents at the beginning of the reporting period 27,517
27,517 Cash and cash equivalents at the end of the reporting period 36,456
GROUP CASH FLOW STATEMENT
97 | Perth and Kinross Council Annual Accounts 2023/24 Page 116 of 214

Page 117

2022/23 2023/24
£'000 £'000
23,269 Deficit on the single entity Comprehensive Income and Expenditure Statement 51,293
for the year
Add:
0 ● Managed Funds - Charitable Trusts and Common Good (374)
8,208 ● Joint Venture 4,270
1,583 ● Associates (339)
3,357 ● Subsidiaries 1,065
36,417 Deficit for the year on the Group Comprehensive Income and Expenditure  Statement 55,915
RECONCILIATION OF THE SINGLE ENTITY DEFICIT FOR THE YEAR TO THE GROUP DEFICIT
98 | Perth and Kinross Council Annual Accounts 2023/24 Page 117 of 214

Page 118

99 | Perth and Kinross Council Annual Accounts 2023/24 
Notes to the Group Accounts
1. Combining Entities
The results of Tayside Valuation Joint Board which is jointly administered with Dundee City and Angus Councils have been
included in the Group Accounts.  The Council is exempt from including the Board as a subsidiary as the Scottish
Government exercises a dominant influence on the Board evidenced particularly by its ability to reconstitute or abolish
statutory bodies or otherwise influence their operating and financial policies.
A number of Councillors have voting rights on the Board.  The Council has an obligation to contribute to the Joint Board
losses or deficits and the ability to exercise significant influence over it.  The Joint Board has therefore been incorporated in
the Group Accounts under the equity method of Accounting for Associates.
For the purpose of consolidation and incorporation within the Group Accounts recognition has been made of the Council’s
interest which is based on its share of the contributions made to the Tayside Valuation Joint Board, which in 2023/24 was
46.2% (2022/23 42.68%).  The accounting period for the Board is the year to 31 March 2024 and the Board Statements of
Accounts presents fairly its individual financial position. 
The individual accounts relating to Tayside Valuation Joint Board are published separately and can be obtained from the
Director of Corporate Services, Dundee City Council, Dundee House, 50 North Lindsay Street, Dundee, DD1 1QE.
In addition, the Council has also included Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth
and Kinross Ltd. as subsidiaries within its Group Accounts in accordance with IAS 27 Consolidated and Separate Financial
Statements, and in particular SIC 12 Consolidation – Special Purpose Entities.  These organisations deliver services on
behalf of the Council and the Council therefore obtains benefit from their operations.  In addition, service delivery is
managed through Service Level Agreements specific to the service provision required from the organisations by the Council. 
Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth and Kinross Ltd. are governed by company
and charitable trust regulation.  For the purpose of consolidation and incorporation within the Group Accounts it has been
assumed that the Council’s interest in these organisations is 100% due to the nature of Council control and direction over
their operations.  
Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth and Kinross Ltd. are arm’s length companies
with sole member status with the Council being the sole member in each company. 
The individual accounts relating to these organisations are published separately, and can be obtained from the following
addresses:-
Live Active Leisure Ltd.    Caledonia House, Hay Street, Perth, PH1 5HS
Perth Theatre and Concert Hall Ltd.    Perth Concert Hall, Mill Street, Perth, PH1 5HZ
Culture Perth and Kinross Ltd.    A K Bell Library, 2-8 York Place, Perth, PH2 8EP
The income, expenditure, assets and liabilities of the Charitable Trusts which are administered and controlled by the Council
have also been included as a managed fund.  The nature of the assets of the managed fund are heritable property,
investments and debtors.  The assets are not the property of Perth and Kinross Council and are subject to charitable trust
regulations.  The Income and Expenditure Account of the Charitable Trusts is detailed on page 91 of the Annual Accounts.
The income, expenditure, assets and liabilities of the Common Good Accounts which are administered and controlled by the
Council have also been included as a managed fund.  The nature of the assets of the managed fund are heritable property,
investments and debtors.  The assets are the property of Perth and Kinross Council and are subject to the Accounting Code
of Practice.  The Income and Expenditure Account of the Common Good is detailed on page 92 of the Annual Accounts.
Perth and Kinross Council’s share of the assets and liabilities of Tayside Contracts Joint Committee, which is jointly
administered and controlled with Dundee City Council and Angus Council, has been included in the Group Accounts using
the equity method for an associate due to the Council having significant influence rather than joint control over the entity. 
The Council’s investment in Tayside Contracts for 2023/24 is 40% (2022/23 34%).  Copies of Tayside Contracts Joint
Committee’s individual accounts are published separately, and can be obtained from Tayside Contracts, 1 Soutar Street,
Dundee, DD3 8SS. 
Perth and Kinross Integration Joint Board (IJB) is the statutory body established to integrate health and social care services
between the Council and NHS Tayside.  The IJB Board consists of eight voting members, four of whom are Perth and
Kinross councillors.  The Council can therefore exercise joint control over the arrangement and the IJB has been
consolidated into the Council Group accounts as a joint venture using the equity method and a percentage share of 50%. 
Copies of the Perth and Kinross Integration Joint Board individual accounts are published separately and can be obtained
from the Chief Financial Officer, Perth and Kinross Integration Joint Board, 2 High Street, Perth, PH1 5PH.
Tayside and Central Scotland Transport Partnership (TACTRAN) is a statutory body established under the Transport
(Scotland) Act 2005.  The partnership covers Angus, Dundee City, Perth and Kinross and Stirling Council areas.  The results
of TACTRAN have been excluded from Perth and Kinross Council’s Group accounts on the grounds of materiality.  
99 | Perth and Kinross Council Annual Accounts 2023/24 Page 118 of 214

Page 119

100 | Perth and Kinross Council Annual Accounts 2023/24 
2. Nature of Combination
The Council inherited its interest in the Tayside Valuation Joint Board following the reorganisation of local government in
1996.  It is considered that the Council’s interest was obtained on an acquisition basis.  However, as no consideration was
given, no goodwill requires to be accounted for.
3. Financial Impact of Consolidation and Going Concern
The effect of inclusion of the Subsidiaries and Associates listed above in the Group Balance Sheet is to increase both
reserves and net assets by £35.017 million (2022/23 £39.279 million increase). 
All Subsidiaries and the Associate have prepared their accounts on a ‘going concern’ basis.  The Council’s Group Accounts
have been prepared on a ‘going concern’ basis as there is no reason to suggest that future funding will not continue.  Apart
from the disclosures made in the Notes to the Group Accounts there were no material amounts or details in relation to
associates or managed funds.
4. Group Comprehensive Income and Expenditure Statement – Financing and Investment Income and Expenditure
2023/24 2022/23
£'000 £'000
Council Financing and Investment Income and Expenditure 18,809 20,309
Subsidiaries (226) (71)
Charitable Trusts (366) 15
Common Good (114) (39)
Total Group CIES Financing and Investment Income and Expenditure 18,103 20,214
5. Group Balance Sheet – Investments
2023/24 2022/23
£'000 £'000
Council Investments 36,560 155,339
Charitable Trusts Investments 3,271 3,083
Common Good Investments 2,340 2,219
Subsidiaries 4,192 0
Total Group Investments 46,363 160,641
6. Group Balance Sheet – Short Term Debtors (net of provisions)
2023/24 2022/23
£'000 £'000
Net Debtors Balance - Note 28 to the Financial Statements 52,344 52,019
Subsidiary Debtors 2,428 2,156
Charitable Trust
Debtors 381 316
Inter-company elimination (374) (288)
Common Good
Debtors 426 462
Inter-company elimination (410) (453)
Total Group Debtors 54,795 54,212
100 | Perth and Kinross Council Annual Accounts 2023/24 Page 119 of 214

Page 120

101 | Perth and Kinross Council Annual Accounts 2023/24 
7. Group Balance Sheet – Short Term Creditors
2023/24 2022/23
£'000 £'000
Net Creditors Balance - Note 29 to the Financial Statements (91,611) (96,104)
Charitable Trust
Creditors (9) (18)
Inter-company elimination 374 288
Common Good
Creditors (106) (134)
Inter-company elimination 410 453
(90,942) (95,515)
Subsidiary Creditors (3,875) (3,093)
Total Group Creditors (94,817) (98,608)
8. Group Balance Sheet – Pension Liability
2023/24 2022/23
£'000 £'000
Net Pensions Liability at 31 March  - Note 18 to the Financial Statements (20,748) (20,917)
Subsidiaries (7) 0
Group Pension Liability at 31 March (20,755) (20,917)
9. Group Cash Flow Statement
There has been no impact on the Group Cash Flow Statement from the inclusion of the Tayside Valuation Joint Board,
Tayside Contracts Joint Committee, or the Perth and Kinross Integration Joint Board.  Cash transactions between the Joint
Boards and the Council are already included within the Council’s Cash Flow Statement and there were no dividend
transactions. 
The impact of the inclusion of Live Active Leisure Ltd., Perth Theatre and Concert Hall Ltd. and Culture Perth and Kinross
Ltd. within the Group Cash Flow Statement is to increase the movement in the net cash position by £5.273 million (2022/23,
increase of £9.854 million).  A cash increase of £3.149 million represents the Council’s 100% share of Live Active Leisure
Ltd., a cash increase of £1.082 million represents the Council’s 100% share of Perth Theatre and Concert Hall Ltd and a
cash increase of £1.042 million represents the Council’s 100% share of Culture Perth and Kinross Ltd.  
10. Group Cash Flow – Investment Activities
2023/24 2022/23
£'000 £'000
Council Investing Activities 8,267 (22,818)
Subsidiaries (4,039) (878)
4,228 (23,696)
11. Group Cash Flow – Financing Activities
2023/24 2022/23
£'000 £'000
Council Financing Activities 19,196 (13,223)
Subsidiaries 0 (40)
19,196 (13,263)
101 | Perth and Kinross Council Annual Accounts 2023/24 Page 120 of 214

Page 121

102 | Perth and Kinross Council Annual Accounts 2023/24 
Remuneration Report
1. Introduction
The Local Authority Accounts (Scotland) Amendment Regulations 2011 (SSI No. 2011/64) require local authorities in
Scotland to prepare a Remuneration Report as part of their annual statutory accounts.  The disclosures within this report
have been prepared in accordance with guidance issued by the Scottish Government on 13 May 2011 in Local
Government Finance Circular No 8/2011 (subsequently updated).  This guidance prescribes the content and format of
the information presented within the Remuneration Report and specifies that remuneration disclosures are to be based
upon taxable expenses and benefits.  The disclosures are set out in accordance with proper accounting practice as
prescribed by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24 and include prior year
comparative figures.
2. Audit of Remuneration Report
The Remuneration Report is a statement in its own right rather than a note to the accounts and certain disclosures within
the report are subject to audit.
All information disclosed in Tables 1 to 7 in this Remuneration Report has been audited by the Council’s appointed
auditor, Audit Scotland.  The other sections of the Remuneration Report have been reviewed by Audit Scotland to ensure
that they are consistent with the financial statements.
3. Remuneration of Senior Councillors
3.1 The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004 (Remuneration) Regulations
2007 (SSI No. 2007/183).  The Regulations provide for the grading of Councillors for the purposes of remuneration
arrangements, as either, the Leader of the Council, the Civic Head (Provost), Senior Councillors or Councillors.  The
Leader of the Council and the Civic Head cannot be the same person for the purposes of payment of remuneration.  A
Senior Councillor is a Councillor who holds a significant position of responsibility in the Council’s political management
structure.
3.2 When determining the level of remuneration for Councillors, the Scottish Ministers considered the recommendations of
the former Scottish Local Authority Remuneration Committee (SLARC).  SLARC was an advisory Non-Departmental
Public Body set up in 2005 to advise Scottish Ministers on the remuneration, allowances and expenses incurred by local
authority councillors.  The Committee was stood down in February 2013 however reconvened in April 2023 to undertake
a one-off independent review of Councillor Remuneration to ensure terms and conditions reflect the responsibilities of a
modern-day Councillor.  Recommendations are currently being considered by the Scottish Ministers and COSLA.
3.3 The Regulations set out the salary that is to be paid to the Leader of the Council in accordance with bandings also set
out in the Regulations.  The Regulations also permit the Council to remunerate one Civic Head, which in the case of
Perth and Kinross Council is the Provost and set out the maximum salary that may be paid to that Civic Head.  For
2023/24 the maximum salary for the Leader of Perth and Kinross Council is £40,205 and the Council has agreed that the
Civic Head be paid 75% of the salary of the Leader, which for 2023/24 is a maximum of £30,154.  Please refer to Table
1.
3.4 In addition to the Leader of the Council and Civic Head, Regulations also set out the maximum number of senior
councillors the Council may have; the maximum yearly amount that may be paid to a senior councillor (75% of the total
yearly amount payable to the Leader of the Council) and the maximum yearly amount payable by the Council for all
senior councillors.  Perth and Kinross Council may have a maximum of 14 senior councillors with a maximum salary of
£30,154 and a maximum yearly amount payable for all senior councillors of £351,771 in 2023/24 (excluding the Council
Leader, Civic Head, Conveners and Vice Conveners of Joint Boards).  The Council is able to exercise local flexibility in
the determination of the precise number of senior councillors and their salary within these maximum limits.
3.5 The Regulations also set out the remuneration payable to councillors with the responsibility of a Convener or a Vice-
Convener of a Joint Board such as Tayside Valuation Joint Board.  The Regulations require the remuneration to be paid
by the Council of which the Convener or Vice-Convener is a member.  Joint Board Conveners and Vice-Conveners are
considered to be senior councillors for remuneration disclosure purposes.  In financial year 2023/24, one councillor from
Perth and Kinross Council served as Convener or Vice Convener of a Joint Board.
3.6 During 2023/24 Perth and Kinross Council had 13 Senior Councillors and a Vice-Convener of a Joint Board.  Details are
provided in Table 1.  Together with the Leader of the Council and the Provost, the total remuneration including taxable
expenses paid to these Councillors was £444,520.  The individual amounts payable to the Leader of the Council, the
Provost, senior councillors of Perth and Kinross Council and the Vice-Convener of a Joint Board in 2023/24 are set out in
Table 1.  The Regulations also permit the Council to pay contributions or other payments as required to the Local
Government Pension Scheme in respect of those Councillors who elect to become councillor members of the pension
scheme. 
102 | Perth and Kinross Council Annual Accounts 2023/24 Page 121 of 214

Page 122

103 | Perth and Kinross Council Annual Accounts 2023/24 
Table 1: Remuneration of Senior Councillors, Conveners and Vice-Conveners of Joint Boards for Financial Year
2023/24 
Name and Post Title  Salary, Fees
and
Allowances
2023/24 
£
Total
Remuneration
2023/24 
£
Total
Remuneration
2022/23 
£
Grant Laing
Council Leader 40,205 40,205 35,853
Xander McDade
Provost (Civic Head) 30,154 30,154 25,031
Peter Barrett
Convener Licensing Board  24,648 24,648 17,841
Bob Brawn
Convener Local Review Body  24,648 24,648 22,939
Dave Cuthbert
Vice-Convener Tayside Valuation Joint Board  23,872 23,872 18,134
Stewart Donaldson
Convener Finance and Resources Committee 27,729 27,729 23,018
Eric Drysdale
Deputy Leader 27,729 27,729 25,497
John Duff
Leader of Largest Opposition Party 27,729 27,729 25,497
David Illingworth
Convener Audit and Risk Committee 27,729 27,729 23,018
Ian Massie
Convener Planning and Placemaking Committee 27,729 27,729 23,018
Tom McEwan
Convener Housing and Social Wellbeing Committee 27,729 27,729 23,018
Andrew Parrott
Depute Provost
Convener Environment, Infrastructure and Economic
Development Committee (01/04/2023 – 05/12/2023) 
Please refer to Note (1)
26,784 26,784 23,018
John Rebbeck
Convener Learning and Families Committee 27,729 27,729 23,018
Colin Stewart
Convener Scrutiny and Performance Committee 27,729 27,729 23,018
Richard Watters
Convener Climate Change and Sustainability
Committee
27,729 27,729 23,018
Michael Williamson
Convener Licensing Committee 24,648 24,648 20,460
TOTAL 444,520 444,520 375,396 
Notes:
(1) Depute Provost Andrew Parrott was the Convener of the Environment, Infrastructure and Economic Development
Committee up until 5 December 2023.  The FTE Salary was £27,729.  From 6 December 2023 the FTE Salary
payable was £24,648.  Councillor Drysdale was the Convenor of this Committee from 6 December 2023 until 5
March 2024 for which he received no additional remuneration as he was already a senior councillor.  The
Committee is no longer active.
(2) After adjusting for the salaries of the Leader of the Council, the Civic Head (Provost) and the Vice-Convener of
Tayside Valuation Joint Board, the total salaries paid to Senior Councillors in 2023/24 was £350,289 which
compares with the maximum under Regulations of £351,771.
3.7 The arrangements for political decision-making structures within Perth and Kinross Council as at 31 March 2024, which
encompassed the salaries of all elected members including the Council Leader, Civic Head and Senior Councillors, were
agreed at the meeting of the Council on 25 May 2022 (Report No. 22/110 refers) and are available on the Council’s
website.  
103 | Perth and Kinross Council Annual Accounts 2023/24 Page 122 of 214

Page 123

104 | Perth and Kinross Council Annual Accounts 2023/24 
3.8 The Council paid the following salaries and expenses to all Councillors (including those listed in Table 1 above) in
financial year 2023/24: 
Table 2: Remuneration Paid to Councillors 1 April 2023 to 31 March 2024
2023/24 2022/23
Type of Remuneration £ £
Salaries 926,897 893,775
Allowances and Expenses 35,499 28,754
Total 962,396 922,529
The annual return of Councillors’ salaries and expenses for 2023/24 is available for any member of the public to view at
Culture Perth and Kinross Ltd. libraries and Council local area offices during normal working hours and is also available
on the Council’s website at Councillors Expenses.
4. Remuneration of Senior Employees
4.1 The Council is required to publish the remuneration of senior employees as defined by the disclosure regulations.  Senior
employees are defined with reference to their management authority; to the political restriction placed upon their post
under section 2(1) (a), (b) or (c) of the Local Government Housing Act 1989 and with reference to their reporting
relationship to the Council’s ‘Head of Paid Service’ or Chief Executive.  The disclosure requirements also include any
employee whose annual remuneration is £150,000 or more.  One employee of Perth and Kinross Council was
remunerated at this level in 2023/24 (Chief Executive).
4.2 The application of the disclosure regulations in relation to the management structure of Perth and Kinross Council
defines the following post-holders as senior employees in 2023/24:
• The Chief Executive as statutory head of paid service.
• The Strategic Lead of Legal and Governance Services as the Council’s statutory monitoring officer; the Chief
Finance Officer as the Council’s proper officer for financial administration (previously the Head of Finance) and the
Chief Officer of the Perth and Kinross Health and Social Care Partnership as the Council’s statutory Chief Social
Work Officer.
• The following officers are directly accountable to the Council’s head of paid service and/or are directly accountable
to the Council or any committee or sub-committee:
o Executive Director of Communities
o Chief Education Officer
o Director of Strategy, People and Resources
o Director of Economy, Place and Learning
o Chief Operating Officer
o Chief Officer of the Perth and Kinross Health and Social Care Partnership
4.3 The Scottish Joint Negotiating Committee (SJNC) for Local Authority Services sets the salaries for the Chief Executives
of Scottish local authorities.    
104 | Perth and Kinross Council Annual Accounts 2023/24 Page 123 of 214

Page 124

105 | Perth and Kinross Council Annual Accounts 2023/24 
4.4 The remuneration of senior employees of Perth and Kinross Council for 2023/24 is detailed in Table 3 below:
Table 3: Remuneration of Senior Employees of the Council for Financial Year 2023/24 
(Job titles as at 31 March 2024) 
Notes:
(1) The substantive salary for the Chief Executive is laid down in COSLA Circular 11.23b.
(2) Remuneration includes non-taxable Relocation Expenses of £4,369.  The Full Year Equivalent Salary for the post of
Director of Economy, Place and Learning was £135,517.
(3) Arun Singh was appointed Chief Social Work Officer from 29 January 2024, taking over this role from Jacqueline
Pepper at that date.  The Full Year Equivalent Salary for the post of Chief Social Work Officer is £105,847.
4.5 Election fees (where applicable) are included with senior employee salaries.  No other taxable benefits or bonuses were
received by the above-named senior employees of Perth and Kinross Council in 2023/24.   
Name and Post Title    
Salary, Fees
and
Allowances
2023/24 
£
Total
Remuneration
2023/24 
£
Total
Remuneration
2022/23 
£
Thomas Glen
Chief Executive (Note 1) 154,609 154,609 148,054
Clare Mailer
Director of Strategy, People and Resources 124,797 124,797 73,126
Jacqueline Pepper
Chief Officer, Perth and Kinross Health and Social Care
Partnership and Chief Social Work Officer
135,517 135,517 127,786
Barbara Renton
Executive Director of Communities 140,050 140,050 130,631
Alison Williams
Director of Economy, Place and Learning
(from 05/02/2024) (Note 2)
25,880 25,880 n/a
Sheena Devlin
Chief Education Officer  135,517 135,517 127,956
Arun Singh
Chief Social Work Officer (from 29/01/2024) (Note 3)
18,728  18,728 0
Karen Donaldson
Chief Operating Officer 124,639 124,639 118,068
Stewart MacKenzie
Head of Finance  103,354 103,354 97,458
Lisa Simpson
Strategic Lead – Legal and Governance 107,647 107,647 101,816
TOTAL 1,070,738 1,070,738 924,895
105 | Perth and Kinross Council Annual Accounts 2023/24 Page 124 of 214

Page 125

106 | Perth and Kinross Council Annual Accounts 2023/24 
4.6 The remuneration paid to the Chief Executive of each of the Council’s subsidiary bodies for 2023/24 is detailed in Table
3A below:
Table 3A: Remuneration of Council’s Subsidiary Bodies Senior Employees for Financial Year 2023/24 
Notes:
(1) Nick Williams left Perth Theatre and Concert Hall Limited on 31 July 2023.  FTE Salary was £73,738.
(2) Christopher Glasgow was appointed Interim Chief Executive on 1 August 2023.  FTE Salary was £63,000.  From 7
November 2023 he was appointed permanently into the role.  FTE Salary was increased to £68,000 from this date.
5. General Disclosure of Remuneration by Pay Band
5.1 In accordance with the disclosure regulations, Table 4 below details the number of Perth and Kinross Council employees
(including teachers) whose annual remuneration in 2023/24 was £50,000 or more, including senior employees subject to
individual disclosure in section 4 of this report.  The information is presented, as required, in bandings of £5,000.
Table 4: Remuneration of Employees by Pay Band for 2023/24
Remuneration Bands  Number of Employees     
2023/24  2022/23
£50,000-£54,999  566  233
£55,000-£59,999  132  88
£60,000-£64,999  123  61
£65,000-£69,999  81  41
£70,000-£74,999  62  15
£75,000-£79,999  22  0
£80,000-£84,999  14  7
£85,000-£89,999  7  3
£90,000-£94,999  2  11
£95,000-£99,999  13  2
£100,000-£104,999  4  2
£105,000-£109,999  4  0
£110,000-£114,999  0  0
£115,000-£119,999  0  1
£120,000-£124,999  2  0
£125,000-£129,999  0  3
£130,000-£134,999  1  0
£135,000-£139,999  2  0
£140,000-£144,999  0  0
£145,000-£149,999  0  1
£150,000-£154,999  1  0     
Total  1,036  468
(See Notes)   
Name and Post Title    
Salary, Fees
and
Allowances
2023/24 
£
Total
Remuneration
2023/24 
£
Total
Remuneration
2022/23 
£
Paul Cromwell
Live Active Leisure – Chief Executive 85,586 85,586 81,152
Helen Smout
Culture Perth and Kinross Limited – Chief Executive 72,000 72,000 66,391
Nick Williams
Perth Theatre and Concert Hall Limited – Chief
Executive. (Note 1)
28,798 28,798 70,902
Christopher Glasgow
Perth Theatre and Concert Hall Limited – Chief
Executive. (Note 2)
44,123 44,123 n/a
TOTAL 230,507 230,507 218,445
106 | Perth and Kinross Council Annual Accounts 2023/24 Page 125 of 214

Page 126

107 | Perth and Kinross Council Annual Accounts 2023/24 
Notes:
As stated in the audited 2022/23 Annual Accounts, due to the delay in concluding the teachers and associated
professionals 2022/23 pay award, the increase in remuneration was not applied until April 2023 and therefore was not
reflected in the actual salary received up to 31 March 2023.  
The increase in numbers are mainly due to fact that 445 teaching staff are now falling into the £50,000 - £54,999 band
following the application of the 2022/23 and 2023/2024 pay award, which includes backdated arrears for the period 1
April 2022 to 31 March 2023.
Table 5: The number of Exit Packages with Total Cost per band and Total Cost of Compulsory and Other
Redundancies
(a)
Exit package cost
band (including
special payments)
(b)
Number of
compulsory
redundancies
(c)
Number of other
departures agreed
(d)
Total number of exit
packages by cost
band (b) + (c)
(e)
Total cost of exit
packages in each
band
2023/24 2022/23 2023/24 2022/23 2023/24 2022/23 2023/24
£’000
2022/23
£’000
£0 - £20,000 1 2 14 5 15 7 126 46
£20,001 - £40,000 0 0 2 1 2 1 79 22
£40,001 - £60,000 0 0 1 0 1 0 53 0
£60,001 - £80,000 0 0 1 0 1 0 72 0
£80,001 - £100,000 0 0 3 0 3 0 276 0
Over £100,000 0 0 3 0 3 0 905 0
Total 1 2 24 6 25 8 1,511 68 
5.2 The costs included within Table 5 are all non-recurring and include payments to individual officers and to the relevant
Pension Fund.  
5.3 All of the individual exit packages included within Table 5 have been subject to a full business case or legal agreement
outlining the implications for the Council or are related to officers who have temporary contracts, and their contract has
ceased but they are entitled to a redundancy payment due to their length of employment.  In terms of the financial
assessment for each business case, the maximum payback period is up to five years.  The departure of individuals has
delivered significant recurring savings to the Council in the past and also facilitated the delivery of an ambitious and
challenging transformation / modernisation programme.
6. Remuneration by Subsidiary Bodies of Perth and Kinross Council
6.1 Councillors and senior employees of Perth and Kinross Council serve as board members, officials and technical advisors
to subsidiary bodies of the Council.  In 2023/24, the Strategic Lead – Legal and Governance served as a proper officer to
the Tayside and Central Scotland Transport Partnership (TACTRAN).  No remuneration was paid to councillors or senior
employees of Perth and Kinross Council by subsidiary bodies of the Council in 2023/24.
7. Disclosure of Pension Benefits
7.1 The disclosure regulations require the separate disclosure of accrued pension benefits for senior councillors and senior
employees of Perth and Kinross Council.  Pension Benefits for councillors and local government employees are provided
through the Local Government Pension Scheme (LGPS).  Councillors have only been eligible to join this scheme since
May 2007.
7.2 Councillor’s pension benefits are based on career average pay.  The councillor’s pay for each year or part year ending 31
March (other than the pay in the final year commencing 1 April) is increased by the increase in the cost of living as
measured by the appropriate index between the end of that year and the last day of the month in which their membership
of the scheme ends.  The total of the revalued pay is then divided by the period of membership to calculate the career
average pay.  This is the value used to calculate the pension benefits.
7.3 From 1 April 2015 a career average scheme was implemented for local government employees.  This means that
pension is built up based on the pensionable pay for each year.  The benefit is added to the employee’s pension account
plus inflation increases.  The scheme’s normal retirement age for both councillors and employees will vary dependant on
age and length of pensionable service.
7.4 From 1 April 2009 a tiered contribution scheme was introduced with contributions from scheme members being based on
how much pay falls into each tier.  Prior to 2009 contribution rates were set at 6% for all non-manual employees.  
107 | Perth and Kinross Council Annual Accounts 2023/24 Page 126 of 214

Page 127

108 | Perth and Kinross Council Annual Accounts 2023/24 
Tiered Pension Contribution Rates for Local Government Pension Scheme Members in 2023/24 
Actual Pensionable pay Contribution Rate
2023/24
On earnings up to and including £25,300 5.5%
On earnings above £25,301 and up to £31,000 7.25%
On earnings above £31,001 and up to £42,500 8.5%
On earnings above £42,501 and up to £56,600 9.5%
On earnings of £56,601 and above  12% 
7.5 Pensionable Pay includes salary, plus any contractual elements of pay such as shift payment, night working payment,
standby and the monetary value of any accommodation or other allowances in kind pertaining to employment.
7.6 Under the scheme there is no automatic entitlement to a lump sum.  Members may opt to give up (commute) pension for
lump sum up to the limit set by the Finance Act 2004.  The pension is built up based on pensionable pay in the year with
an accrual rate of 1/49th added to the pension account. (Prior to 2015 the accrual rate was 1/60th of final pensionable
salary and years of pensionable service.  Prior to 2009 the accrual rate guaranteed a pension based on 1/80th and a
lump sum based on 3/80th of final pensionable salary and years of pensionable service).
7.7 The value of accrued benefits has been calculated on the basis of the age at which the person will first become entitled
to receive a pension on their retirement without reduction on account of its payment at that age; without exercising any
option to commute pension entitlement into a lump sum; and without any adjustment for the effects of future inflation. 
The pension figures shown relate to the benefits that the person has accrued as a consequence of their local
government service, and not just their current appointment.
7.8 Pension Entitlements of Senior Councillors
The pension entitlements of senior councillors of Perth and Kinross Council for the year to 31 March 2024 are shown in
Table 6 below, together with the contribution made by the Council to each senior councillor’s pension during the year.
Table 6: Pension Entitlements of Senior Councillors for Financial Year 2023/24   
Name and Post Title  
In-year pension
contributions 
(Note 1) Accrued Pension Benefits (Note 2)
2023/24 
£
2022/23 
£
as at
31/03/2024
£’000
as at
31/03/2023
£’000
Difference 
£’000
Grant Laing
Council Leader 6,835 6,268 Pension
Lump Sum
6
0
5
0
1
0
Xander McDade
Provost (Civic Head) 5,126 4,742 Pension
Lump Sum
3
0
2
0
1
0
Peter Barrett
Convener Licensing Board  4,190 3,888 Pension
Lump Sum
8
2
7
2
1
0
Bob Brawn
Convener Local Review Board   4,190 4,073 Pension
Lump Sum
4
0
3
0
1
0
Dave Cuthbert
Vice-Convener Tayside Valuation Joint
Board
4,058 3,493 Pension
Lump Sum
1
0
0
0
1
0
Stewart Donaldson
Convener Finance and Resources
Committee
4,714 4,400 Pension
Lump Sum
4
0
3
0
1
0
Eric Drysdale
Deputy Leader 4,714 4,508 Pension
Lump Sum
4
0
3
0
1
0
John Duff
Leader of Largest Opposition Party 4,714 4,508 Pension
Lump Sum
3
0
2
0
1
0
David Illingworth
Convener Audit and Risk Committee 4,714 4,400 Pension
Lump Sum
3
0
2
0
1
0
Ian Massie
Convener Planning and Placemaking
Committee
4,714 4,400 Pension
Lump Sum
2
0
1
0
1
0
Tom McEwan
Convener Housing and Social
Wellbeing Committee
4,714 4,400 Pension
Lump Sum
3
0
2
0               
1
0
Andrew Parrott
Convener Environment, Infrastructure
and Economic Development Committee
4,553 4,400 Pension
Lump Sum
4
0
3
0
1
0
John Rebbeck
Convener Learnings and Families
Committee
4,714 4,400 Pension
Lump Sum
3
0
2
0
1
0
108 | Perth and Kinross Council Annual Accounts 2023/24 Page 127 of 214

Page 128

109 | Perth and Kinross Council Annual Accounts 2023/24 
Name and Post Title  
In-year pension
contributions 
(Note 1) Accrued Pension Benefits (Note 2)
2023/24 
£
2022/23 
£
as at
31/03/2024
£’000
as at
31/03/2023
£’000
Difference 
£’000
Colin Stewart
Convener Scrutiny and Performance
Committee
4,714 4,400 Pension
Lump Sum
3
0
3
0
0
0
Richard Watters
Convener Climate Change and
Sustainability Committee
4,714 4,400 Pension
Lump Sum
3
0
2
0
1
0
Michael Williamson
Convener Licensing Committee 4,190 3,965 Pension
Lump Sum
5
0
4
0
1
0
TOTAL 75,568 70,645 
Notes:
(1) The in-year employer pension contributions shown are based on all pensionable earnings for financial year
2023/24, not just current appointments.
(2) The pension benefits shown relate to the benefits that the individual has accrued as a consequence of their total
local government service, including any service with a Council subsidiary body, and not just their current
appointment.  Councillors have only been eligible to join the Local Government Pension Scheme since May 2007. 
7.9 Table 7: Pension Entitlements of Senior Employees of the Council for Financial Year 2023/24
(Post titles as at 31 March 2024) 
Name and Post Title  
In-year pension contributions 
(Note 1)
Accrued Pension Benefits
(Note 2) 
2023/24 
£
2023/24
Strain 
on Fund
(Note 4)
£
2022/23 
£  
as at
31/03/2024 
£’000 
as at
31/03/2023 
£’000
Difference 
£’000
Thomas Glen
Chief Executive (Note 3) 26,283 0 25,169
Pension
Lump
Sum
77
0
4
0
73
0
Clare Mailer
Director of Strategy, People and
Resources  
21,215 0 17,599
Pension
Lump
Sum
53
67
43
55
10
12
Jacqueline Pepper
Chief Officer, Perth and Kinross
Health and Social Care
Partnership and Chief Social
Work Officer
23,038 0 21,724
Pension
Lump
Sum
55
35
44
33
11
2
Barbara Renton
Executive Director of
Communities 
23,038 93,404 21,724
Pension
Lump
Sum
40
9
35
9
5
0
Alison Williams
Director Economy, Place and
Learning (from 05/02/2024)
3,657 0 n/a
Pension
Lump
Sum
0
0
n/a
n/a
0
0
Sheena Devlin 
Chief Education Officer  22,329 0 21,724
Pension
Lump
Sum
78
125
72
122
6
3
Karen Donaldson
Chief Operating Officer  21,214 175,115 20,004
Pension
Lump
Sum
64
100
58
95
6
5
Arun Singh
Chief Social Work Officer (from
29/01/2024)
3,184 0 0
Pension
Lump
Sum
0
0
0
0
0
0
Stewart MacKenzie
Head of Finance 17,570 297,151 16,568
Pension
Lump
Sum
53
72
48
68
5
4
Lisa Simpson
Strategic Lead – Legal and
Governance
18,208 0 17,256
Pension
Lump
Sum
20
0
16
0
4
0
TOTAL 179,736 565,670 161,768 
109 | Perth and Kinross Council Annual Accounts 2023/24 Page 128 of 214

Page 129

110 | Perth and Kinross Council Annual Accounts 2023/24 
Notes:
(1) The in-year employer pension contributions shown are based on all pensionable earnings for financial year
2023/24, not just the current appointment.
(2) Accrued pension benefits include total benefits accumulated during all membership of the Local Government
Pension Scheme and not just service in their current role.
(3) Transfer-in of service completed 2023/24 for Chief Executive Thomas Glen.
(4) These are additional in-year pension contributions, representing strain costs being the amount the Council is
required to pay to the pension fund. This is chargeable when an employee retires before the assumed retirement
age, that would otherwise result in a shortfall in contributions up to the assumed retirement age.
7.10 Pension Entitlements – Council’s Subsidiary Bodies
The pension entitlements of the Chief Executives of each of the Council’s subsidiary bodies for the year to 31 March
2024 are show in Table 7A below, together with the contribution made to each Senior Employees’ pension during the
year.
Table 7A: Pension Entitlements of Senior Employees of each of the Council’s Subsidiary Bodies for Financial
Year 2023/24 
Name and Post Title  
In-year pension
contributions
(Note 1)
Accrued Pension Benefits
(Note 2)
2023/24 
£
2022/23 
£  
as at
31/03/2024
£’000 
as at
31/03/2023
£’000
Difference 
£’000
Paul Cromwell
Live Active Leisure – Chief Executive 14,550 13,796 Pension
Lump Sum
27
13
24
12
3
1
Helen Smout
Culture Perth and Kinross Limited -
Chief Executive
12,240 11,287 Pension
Lump Sum
29
26
25
24
4
2
Nick Williams
Perth Theatre and Concert Hall Limited
– Chief Executive (Note 3)
4,179 12,053 Pension
Lump Sum
6
0
5
0
1
0
Christopher Glasgow
Perth Theatre and Concert Hall Limited
– Chief Executive (Note 4)
10,259 n/a Pension
Lump Sum
3
0
n/a
n/a
3
0
TOTAL 41,228 37,136 
Notes:
(1) The in-year employer pension contributions shown are based on all pensionable earnings for financial year
2023/24, not just the current appointment.
(2) Accrued pension benefits include total benefits accumulated during all membership of the Local Government
Pension Scheme and not just service in their current role.
(3) Nick Williams left Perth Theatre and Concert Hall Limited on 31 July 2023. 
(4) Christopher Glasgow was promoted to Interim Chief Executive on 1 August 2023.  From 7 November 2023 he was
appointed permanently into the role. 
8. Trade Union (Facility Time Publication Requirements) Regulations 2017
8.1 The Council is required to report from 1 April 2017 a range of information on facility time made available to its employees
who are trade union representatives.  This link provides the information: Trade Union Statutory Return 2023/24.
Signed: 
Thomas Glen  Councillor Grant Laing
Chief Executive  Leader of the Council
Perth and Kinross Council
Date: 
Perth and Kinross Council
Date: 
110 | Perth and Kinross Council Annual Accounts 2023/24 Page 129 of 214

Page 130

111 | Perth and Kinross Council Annual Accounts 2023/24 
Glossary
ACCOUNTING PERIOD
The period of time covered by the accounts, normally a period of twelve months commencing on 1 April.  The end of the
accounting period is the Balance Sheet date.
ACCRUALS
Sums included in the final accounts to recognise revenue and capital income and expenditure earned or incurred in the financial
year, but for which actual payment had not been received or made as at 31 March.  
BEACON METHOD (ADJUSTED VACANT POSSESSION METHOD)
Based on the (vacant possession) market value of the asset which is the adjusted to reflect the assets’ use for social housing
with a sitting tenant.
CAA
Capital Adjustment Account
CAPITAL EXPENDITURE
Expenditure on the acquisition of a fixed asset, which will be used in providing services beyond the current accounting period, or
expenditure which adds to and not merely maintains the value of an existing fixed asset.  
CAPITAL FINANCING
Funds raised to pay for capital expenditure.  There are various methods of financing capital expenditure including borrowing,
leasing, direct revenue financing, usable capital receipts, capital grants, capital contributions, revenue reserves and earmarked
reserves.  
CAPITAL RECEIPT
The proceeds from the disposal of land or other fixed assets.  Proportions of capital receipts can be used to finance new capital
expenditure, within rules set down by the Government but they cannot be used to finance revenue expenditure.  
CONTINGENT LIABILITY
A contingent liability is either:
• A possible obligation arising from past events whose existence will be confirmed only by the occurrence of one or
more uncertain future events not wholly within the Council’s control; or
• A present obligation arising from past events where it is not probable that a transfer of economic benefits will be
required, or the amount of the obligation cannot be measured with sufficient reliability.  
CORPORATE and DEMOCRATIC CORE
The corporate and democratic core comprises all the activities that local authorities engage in specifically because they are
elected, multi-purpose authorities.  The cost of these activities are thus over and above those which would be incurred by a
series of independent single purpose, nominated bodies managing the same services.  There is therefore no logical basis for
apportioning these costs to services.  
CREDITOR
Amount owed by the Council for work done, goods received or services rendered within the accounting period, but for which
payment has not been made by the Council by the end of that accounting period.  
CRR
Capital Receipts Reserve
CURRENT VALUE
The measurement of operational assets used for the delivery of Council services.  Property, plant and equipment is measured
on the basis of service potential using existing use value for assets where an active market exists, existing use value-social
housing for operational Council dwellings or depreciated replacement cost for assets where there is no market and/or the asset
is specialised.
DBFM
Design Build Finance Maintain - A Non-Profit Distribution (NPD) model to Design, Build, Finance, and Maintain infrastructure
which requires the private sector to take a fixed rate of return.  The DBFM agreement provides the Council with the right to
receive services in return for an annual payment (unitary charge) which comprises the costs of construction, finance, and
maintenance, and for the provision of any agreed additional services, for the duration of the agreement.
DEBTOR
Amount owed to the Council for works done, goods received or services rendered within the accounting period, but for which
payment has not been received by the Council by the end of that period.    
111 | Perth and Kinross Council Annual Accounts 2023/24 Page 130 of 214

Page 131

112 | Perth and Kinross Council Annual Accounts 2023/24 
EXISTING USE VALUE FOR SOCIAL HOUSING (EUV-SH)
Is the estimated amount for which a property should exchange on the date of valuation, between a willing buyer and a willing
seller in an arm’s length transaction.
FAIR VALUE
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between
market participants at the measurement date.
FIAA
Financial Instruments Adjustment Account
IMPAIRMENT
A reduction in the value of a fixed asset to below its carrying amount on the Balance Sheet.
MATERIALITY
The concept that the Annual Accounts should include all amounts which, if omitted, or mis-stated, could be expected to lead to a
distortion of the financial statements and ultimately mislead a user of the accounts.  
NET BOOK VALUE
The amount at which fixed assets are included in the Balance Sheet, i.e. their historical costs or current value less the
cumulative amounts provided for depreciation.  
NON-DISTRIBUTED COSTS
These are overheads which cannot be directly allocated to a specific area of activity and as such are not apportioned to
services.  
PPE
Property, Plant and Equipment
PRIOR YEAR ADJUSTMENT
Material adjustments applicable to previous years arising from changes in accounting policies or from the correction of
fundamental errors.  This does not include normal recurring corrections or adjustments of accounting estimates made in prior
years.  
PROVISION
An amount put aside in the accounts for future liabilities or losses which are certain or very likely to occur but the amounts or
dates of when they will arise are uncertain.  
PUBLIC WORKS LOAN BOARD (PWLB)
An agency of HM Treasury, which provides loans mainly for capital purposes of one year or more to authorities at interest rates
of up to 2% above those at which the UK Government can itself borrow at.
REVENUE EXPENDITURE
The day-to-day expenses of providing services.  
SERVICE CONCESSION ARRANGEMENTS
Service concession (PPP and PFI) arrangements involve the operator undertaking an obligation to provide assets (and related
services) that are used to provide services to the public (irrespective of who provides those services to the public).
112 | Perth and Kinross Council Annual Accounts 2023/24 Page 131 of 214

Page 132

Page 132 of 214

Page 133

Rachel Browne, Audit Director
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN
Finance and Business Support
Strategic Lead – Scott Walker
2 High Street, Perth, PH1 5PH
Tel 01738 475000  www.pkc.gov.uk
Contact Scott Walker
Tel 01738 475515
Email SWWalker@pkc.gov.uk
Our ref SW/KD
Your ref
Date 26 November 2024
Dear Rachel
Perth and Kinross Council
Annual Accounts 2023/24
1. This representation letter is provided about your audit of the annual accounts of Perth and
Kinross Council and its group (hereafter referred to as Perth and Kinross Council), for the
year ended 31 March 2024 for the purpose of expressing an opinion as to whether the
financial statements give a true and fair view and have been properly prepared, and for
expressing other opinions on the Remuneration Report, Management Commentary, and
Annual Governance Statement.
2. I confirm to the best of my knowledge and belief and having made appropriate enquiries
of the Chief Executive and Executive and Strategic Leadership Teams, the following
representations given to you in connection with your audit of Perth and Kinross Council’s
annual accounts for the year ended 31 March 2024.
General
3. Perth and Kinross Council and I have fulfilled our statutory responsibilities for the
preparation of the 2023/24 annual accounts. All the accounting records, documentation,
and other matters which I am aware are relevant to the preparation of the annual
accounts have been made available to you for the purposes of your audit. All transactions
undertaken by Perth and Kinross Council have been recorded in the accounting records
and are properly reflected in the financial statements.  
4.  I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. I am not aware of any uncorrected
misstatements other than those reported by you. 
Financial Reporting Framework
5. The annual accounts have been prepared in accordance with the Code of Practice on
Local Authority Accounting in the United Kingdom 2023/24 (2023/24 Code), and the
Delayed Office Opening for
Employee Training
This office will be closed from
8.45 am - 11.00 am on the
first Thursday of each month.
4
Page 133 of 214

Page 134

requirements of the Local Government (Scotland) Act 1973, the Local Government in
Scotland Act 2003, and The Local Authority Accounts (Scotland) Regulations 2014.
6. In accordance with the 2014 Regulations, I have ensured that the financial statements
give a true and fair view of the financial position of the Perth and Kinross Council and its
group at 31 March 2024 and the transactions for 2023/24. 
Accounting Policies and Estimates
7. All material accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2023/24 Code where
applicable. All accounting policies applied are appropriate to Perth and Kinross Council’s
circumstances and have been consistently applied.
8. The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. Judgements used in making estimates have
been based on the latest available, reliable information. Estimates have been revised
where there are changes in the circumstances on which the original estimate was based
or as a result of new information or experience.
Going Concern Basis of Accounting
9. I have assessed Perth and Kinross Council’s ability to continue to use the going concern
basis of accounting and have concluded that it is appropriate. I am not aware of any
material uncertainties that may cast significant doubt on Perth and Kinross Council’s
ability to continue to adopt the going concern basis of accounting.
Assets 
10. Where a rolling programme of asset valuations has been used, I have satisfied myself
that the carrying amount of assets at 31 March 2024 does not differ materially from that
which would be determined if a revaluation had been carried out at that date.
11. I carried out an assessment at 31 March 2024 as to whether there is any indication that
an asset may be impaired and have recognised any impairment losses identified.
12.  I have provided you with all information of which I am aware regarding any valuation
exercises carried out after 31 March 2024. 
13. There are no plans or intentions that are likely to affect the carrying value or classification
of the assets recognised within the financial statements.
14.  Owned assets are free from any lien, encumbrance or charge except as disclosed in the
financial statements. 
Liabilities 
15. All liabilities at 31 March 2024 of which I am aware have been reported in the financial
statements.
Page 134 of 214

Page 135

16. Provisions have been recognised in the financial statements for all liabilities of uncertain
timing or amount at 31 March 2024 of which I am aware where the conditions specified in
the 2023/24 Code have been met. The amount recognised as a provision is the best
estimate of the expenditure likely to be required to settle the obligation at 31 March 2024.
Where the effect of the time value of money is material, the amount of the provision has
been discounted to the present value of the expected payments.  
17. Provisions recognised in previous years have been reviewed and adjusted, where
appropriate, to reflect the best estimate at 31 March 2024 or to reflect material changes in
the assumptions underlying the calculations of the cash flows.
18. The accrual recognised in the financial statements for annual leave untaken by 31 March
2024 has been estimated on a reasonable basis. 
19. The pension assumptions made by the actuary in the IAS 19 report for Perth and Kinross
Council have been reviewed and I confirm that they are consistent with management's
own view. 
20. There are no plans or intentions that are likely to affect the carrying value or classification
of the liabilities recognised in the financial statements.
Contingent Liabilities
21. There are no significant contingent liabilities, other than those disclosed in Note 38 to the
financial statements, arising either under formal agreement or through formal
undertakings requiring disclosure in the accounts. All known contingent liabilities have
been fully and properly disclosed in accordance with the 2023/24 Code and IAS 37.
Litigation and Claims
22. All known actual or possible legal claims have been disclosed to you and have been
accounted for and disclosed in the financial statements in accordance with the 2023/24
Code. 
Fraud
23. I understand my responsibilities for the design, implementation, and maintenance of
internal control to prevent fraud and I believe I have appropriately fulfilled those
responsibilities. 
24. I have provided you with all information in relation to:
 my assessment of the risk that the financial statements may be materially misstated
because of fraud 
 any allegations of fraud or suspected fraud affecting the financial statements, and
 fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Page 135 of 214

Page 136

Laws and Regulations
25. I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when
preparing financial statements.
Related Party Transactions
26. All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2023/24 Code. I have made
available to you the identity of all Perth and Kinross Council’s related parties and all the
related party relationships and transactions of which I am aware.
Remuneration Report
27. The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Regulations 2014, and all required information of which I am aware
has been provided to you.
Management Commentary
28. I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
29. I confirm that Perth and Kinross Council has undertaken a review of the system of internal
control during 2023/24 to establish the extent to which it complies with proper practices
set out in the Delivering Good Governance in Local Government: Framework 2016. I have
disclosed to you all deficiencies in internal control identified from this review or of which I
am otherwise aware.
30. I confirm that the Annual Governance Statement has been prepared in accordance with
the Delivering Good Governance in Local Government: Framework 2016 and the
information is consistent with the financial statements. There have been no changes in
the corporate governance arrangements or issues identified since 31 March 2024 which
require to be reflected. 
Group Accounts
31. I have identified all the other entities in which Perth and Kinross Council has a material
interest and have classified and accounted for them in accordance with the 2023/24
Code. Any significant issues with the financial statements of group entities, including any
qualified audit opinions, have been advised to you.
Common Good Fund
32. I confirm, to the best of my ability, that all material common good assets have been
identified and correctly accounted for within the common good fund financial statements
and where appropriate, common good assets in use by the council have been assessed
and accounted for in line with IAS 17.  
Page 136 of 214

Page 137

Events Subsequent to the Date of the Balance Sheet
33. All events subsequent to 31 March 2024 for which the 2023/24 Code requires adjustment
or disclosure have been adjusted or disclosed.
Yours sincerely
Scott Walker
Chief Finance Officer
Page 137 of 214

Page 138

Page 138 of 214

Page 139

Prepared for the Members of Perth and Kinross Council and the Controller of Audit
2 December 2024
Perth and Kinross
Council
2023/24 Annual Audit Report – DRAFT 
4
Page 139 of 214

Page 140

Perth and Kinross Council 2023/24 Annual Audit Report – DRAFT | 2
Contents 
Key messages 3
Introduction 5
1. Audit of 2023/24 annual accounts 6
2. Financial management 15
3. Financial sustainability 20
4. Best Value 27
5. Vision, leadership, governance and use of resources 31
Appendix. Action plan 2023/24 39
Page 140 of 214

Page 141

Key messages | 3 
Key messages 
2023/24 annual accounts 
1 Audit opinions on the annual accounts of the council, its group and the
connected charities are unmodified.
Financial management 
2 The council’s budget setting and financial management arrangements
operated effectively during 2023/24. 
3 Excluding the one-off impact of service concession flexibility, the council
reported a £15.1 million (3.2 per cent) deficit on general fund services for
2023/24 which was £20.2 million less than planned. The Housing Revenue
Account balance reduced by £0.4 million during 2023/24 due to the planned
use of reserves (£0.3 million) and additional one-off costs identified during the
year (£0.1 million).  
4 The council delivered 76 per cent of its capital programme in 2023/24.
External debt levels remained relatively static during the year as the council
had taken advantage of low borrowing rates in previous years and these
loans have been used to fund capital expenditure.  
5  Key financial controls operated effectively during 2023/24.
Financial sustainability
6 The council’s general fund balance increased in the year due to the
application of the service concession financial flexibility accounting
arrangements. The council has used this to support its 2023/24 outturn and
plans to use the remainder to support its budgets through to 2027/28.   
7 The 2024/25 budget included a planned use of reserves of £13.8 million, but
subsequent amendments increased this to £28.1 million.
8 The medium-term financial plan has not been updated since October 2023
and will be reviewed following publication of the Scottish Government’s
Medium-Term Financial Strategy.  The council has yet to develop its revenue
financial planning beyond six years as recommended in the 2019 Best Value
Assurance Report. 
Page 141 of 214

Page 142

Key messages | 4 
9 The council’s capital investment programme totals £674 million over the next
five years and a Corporate Asset Management Framework has been
approved to inform investment decision-making. Following an updated
options appraisal, the PH2O project, which was paused last year due to
inflationary pressures, is going ahead on an alternative site.  
10 The Transformation and Change Programme is progressing in line with the
planned timetable. 
Best Value
11 Our Best Value thematic review of workforce innovation confirmed that the
council has a workforce plan to support the delivery of its strategic objectives
but has yet to set targets against which to measure and report on progress. 
12 Two of the 2019 Best Value Assurance Report recommendations remain
outstanding and there has been limited reporting of progress to members or
the Executive Leadership Team.
Vision, leadership, governance, and use of resources
13 The council revised its service and senior leadership structure during the year
as part of its Transformation and Change Programme.  
14 The council has appropriate governance arrangements in place for delivery of
its plans. 
15 In line with national trends, there has been an overall decline in LGBF
performance indicators over the last 5 years, although performance relative to
other councils is largely unchanged. KPI trend analysis suggests
improvement in performance compared to last year.
16 The council is compliant with the Accounts Commission’s SPI direction with
comprehensive performance information available via ‘PK Performs.’ 
Page 142 of 214

Page 143

Introduction | 5 
Introduction 
1.  This report summarises the findings from the 2023/24 annual audit of Perth
and Kinross Council (the council) and will be published on Audit Scotland’s
website: website www.audit-scotland.gov.uk. 
2.  The scope of the audit was set out in an annual audit plan presented to the
March 2024 meeting of the Audit and Risk Committee. This annual audit report
comprises significant matters arising from the audit of the council’s annual
accounts and conclusions on the wider scope areas set out in the Code of Audit
Practice. It also provides a summary of the conclusions from our Best Value
thematic report as presented to the September 2024 meeting of the Audit and
Risk Committee.
3.  We would like to thank elected members, management, and staff, particularly
those in finance, for their cooperation and assistance during the audit.
Responsibilities and reporting 
4.  Perth and Kinross Council has primary responsibility for ensuring the proper
financial stewardship of public funds. This includes preparing annual accounts
that are in accordance with proper accounting practices. The council is also
responsible for compliance with legislation and putting arrangements in place
for governance and propriety that enable it to successfully deliver its objectives.
5.  The responsibilities of the independent auditor are established by the Local
Government (Scotland) Act 1973, the Code of Audit Practice 2021 and
supplementary guidance, and International Standards on Auditing in the UK. 
6.  This report contains an agreed action plan at the Appendix setting out
specific recommendations, responsible officers, and dates for implementation.
Weaknesses or risks identified are only those which have come to our attention
during our audit work and may not be all that exist. Communicating these does
not absolve management of responsibility to address the issues raised and to
maintain adequate systems of control.
Auditor independence 
7.  We confirm that we comply with the Financial Reporting Council’s Ethical
Standard and that we have not undertaken any non-audit related services. The
2023/24 audit fee of £356,400 (£350,000 for the council and £6,400 for the
charitable trusts), as set out in our Annual Audit Plan, remains unchanged. We
are not aware of any relationships that could compromise our objectivity or
independence. 
Page 143 of 214

Page 144

1. Audit of 2023/24 annual accounts | 6 
1. Audit of 2023/24 annual
accounts
Public bodies are required to prepare annual accounts comprising
financial statements and other related reports. These are the principal
means of accounting for the stewardship of public funds. 
Main judgements
Audit opinions on the annual accounts of the council, its group and the connected
charities are unmodified. 
Audit opinions on the annual accounts are unmodified 
8.  The independent auditor’s report included the following audit opinions on the
annual accounts:
• the financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework
• the audited part of the remuneration report was prepared in accordance
with The Local Authority Accounts (Scotland) Regulations 2014.
• the management commentary and annual governance statement were
consistent with the financial statements and properly prepared in
accordance with the applicable requirements.
The annual accounts were certified on 2 December 2024, in line
with the agreed audit timetable
9.  We received the unaudited annual accounts on 26 June 2024, in line with the
agreed audit timetable. The accounts presented for audit were of a good
standard, and the associated working papers had improved in response to our
prior year audit recommendation (Appendix, b/f Recommendation 3).
10.  Management and finance staff provided good support to the team during
the audit process. We continue to work towards recovery of reporting
timescales and are on track to restore these by the end of the current
appointment round. 
Page 144 of 214

Page 145

1. Audit of 2023/24 annual accounts | 7 
Our audit approach and testing were informed by the overall
materiality level of £15.2 million
11.  The concept of materiality is applied by auditors to determine whether
misstatements identified during the audit could reasonably be expected to
influence the economic decisions of users of the financial statements, and
impact on the opinion set out in the independent auditor’s report. Auditors set a
monetary threshold when considering materiality, although some issues may be
considered material by their nature. It is ultimately a matter of the auditor’s
professional judgement.
12.  Our initial assessment of materiality was carried out during the planning
phase of the audit and was based on the audited 2022/23 annual accounts.
These materiality levels were reported in our annual audit plan presented to the
March 2024 meeting of the Audit and Risk Committee.
13.  On receipt of the unaudited 2023/24 annual accounts, we reconsidered our
materiality levels based on the financial results for the year ended 31 March
2024 and revised the amounts to reflect the increase in gross expenditure.
Materiality amounts used for the audit are detailed in Exhibit 1. 
Exhibit 1
Materiality levels for the 2023/24 audit  
Materiality level Council Group
Overall materiality: this is the figure we calculate to
assess the overall impact of audit adjustments on the
financial statements. Materiality has been set based on our
assessment of the needs of the users of the financial
statements and the nature of the council’s operations. For
the year ended 31 March 2024, we set materiality at 2% of
gross expenditure.
£15.2 million £15.4 million
Performance materiality: this acts as a trigger point. If the
aggregate of errors identified during the financial
statements audit exceeds performance materiality, this
could indicate that further audit procedures are required.
Using our professional judgement, we have assessed
performance materiality at 60% of overall materiality.
£9.1 million £9.2 million
Reporting threshold: we are required to report to those
charged with governance on all unadjusted misstatements
more than the ‘reporting threshold’ amount.
£0.5 million £0.5 million
Source: Audit Scotland   
Page 145 of 214

Page 146

1. Audit of 2023/24 annual accounts | 8 
Our audit identified and addressed the risks of material
misstatement
14.  Exhibit 2 sets out the significant risk and non-significant risks of material
misstatement to the financial statements. It also summarises the further audit
procedures performed during the year to obtain assurances over these risks
and the conclusions from the work completed. 
Exhibit 2
Risks of material misstatement in the annual accounts
Audit risk Assurance procedure Results and conclusions
Significant risks of material misstatement
1. Risk of material
misstatement due to
fraud caused by
management override of
controls
As stated in ISA(UK) 240,
management is in a unique
position to perpetrate fraud
because of management’s
ability to override controls
that otherwise appear to
be operating effectively.
Assess the design and
implementation of controls over
journal entry processing.
Make inquiries of individuals
involved in the financial reporting
process about inappropriate or
unusual activity relating to the
processing of journal entries and
other adjustments.
Use data analytics to consider,
identify and test journals at the
year-end and post-closing entries
and focus on significant risk
areas.
Consider the need to test journal
entries and other adjustments
throughout the year.
Evaluate significant transactions
outside the normal course of
business.
Assess any changes to the
methods and underlying
assumptions used to prepare
accounting estimates compared
to the prior year. 
Substantively test income and
expenditure transactions around
the year-end to confirm they are
accounted for in the correct
financial year.
The completion of the
assurance procedures did
not identify any evidence of
management override of
controls.  
Page 146 of 214

Page 147

1. Audit of 2023/24 annual accounts | 9 
Audit risk Assurance procedure Results and conclusions
Test accounting accruals and
prepayments focusing on
significant risk areas. 
2. Estimation in the
valuation of other land
and buildings (OLB)
There is a significant
degree of subjectivity in
the valuation of other land
and buildings. Valuations
are based on specialist
assumptions, and changes
in these can result in
material changes to
valuations.
OLB are revalued on a
five-year rolling basis.
Values may change
between periodic
valuations. OLB are valued
at 1 April and there is a
risk of material movement
between the date of
valuation and the balance
sheet date.
The council undertakes fair
value assessments to
ensure the financial
statements accurately
reflect the carrying value of
land and buildings at 31
March 2024. This resulted
in a material adjustment to
the accounts in 2022/23.
Review the information provided
to the valuer to assess for
completeness.
Evaluate the competence,
capabilities, and objectivity of the
professional valuer.
Review the reconciliation
between the accounts, property
asset register and valuers’
reports.
Confirm a sample of asset
valuations to valuers’ reports
including useful lives.
Test a sample of OLB subject to
revaluation in 2023/24 and
critically assess the
appropriateness of estimates and
assumptions. 
Confirm our understanding of
management’s involvement in the
valuation process for OLB to
assess if appropriate oversight
has occurred.
Examine management’s
assessment of fair value of OLB
assets not revalued in 2023/24
and assess the appropriateness
of any assumptions. 
We reviewed and tested
information, reports and
valuations as planned and
did not find any errors in the
2023/24 revaluations, nor
any issues with the
competence, capability, or
objectivity of the
professional valuer.
We confirmed there was
appropriate oversight of the
valuation process by
management, and the
reconciliation between the
accounts, property asset
register and valuers’ reports
did not identify any issues.
Management’s assessment
of the fair value of OLB at
31 March 2024 did not
identify any material
movements and we were in
agreement with their
conclusions.
We concluded that the value
of Other Land and Buildings
at 31 March 2024 is not
materially misstated.
Other non-significant risks of material misstatement
3. Estimation in the
valuation of pension
assets and liabilities
Actuarial estimates are a
complex combination of
liabilities over significant
future periods based on
life expectancy, CPI
growth and discounting
Assess the scope, independence
and competence of the
professionals engaged in
providing estimates for pensions.
Review the appropriateness of
actuarial assumptions and results
including comparison with other
councils and the pension fund as
a whole.
We identified that
information relating to the
early retiral/voluntary
severance of six individuals
which was approved during
the 2023/24 financial year
was not communicated to
the actuary of the Tayside
Pension Fund by the
administrators of the Fund.
We undertook further audit
Page 147 of 214

Page 148

1. Audit of 2023/24 annual accounts | 10 
Audit risk Assurance procedure Results and conclusions
(based on corporate bond
rates).
Assets are based on an
individual employer body’s
share of assets at the last
triennial valuation. Roll
forward adjustments are
provided to members data
and to asset valuations.
There is a risk that small
changes in the
assumptions used can
lead to large changes in
the resulting valuations
resulting in a material
misstatement in the annual
accounts. 
Establish officers’ arrangements
for ensuring the reasonableness
of professional estimations and
the accuracy of information
provided to the actuary by the
council. 
procedures to confirm this
had not led to a material
misstatement in the annual
accounts, and these
procedures concluded
satisfactorily. Should there
be a future, large, voluntary
severance scheme
however, such omitted
information may lead to a
material misstatement.
Recommendation 1
Completion of our other
assurance procedures did
not identify any errors in the
valuation of pension assets
or liabilities.  
Source: Audit Scotland
We reported the significant findings from the audit prior to the
annual accounts being approved and certified
15.  Under ISA (UK) 260, we are required to communicate significant findings
from the audit, including our view about the qualitative aspects of the council’s
accounting practices, to those charged with governance, prior to the audited
accounts being approved and certified.
16.  The Code of Audit Practice also requires us to highlight key audit matters
which are defined in ISA (UK) 701 as those matters judged to be of most
significance. 
17.  The significant findings are summarised in Exhibit 3.
Exhibit 3
Significant findings and key audit matters from the audit of the annual accounts
Issue Resolution 
1. Error in accounting for depreciation of
council dwellings 
The annual depreciation charge for council
dwellings was calculated for a full year, both before
and after revaluation at 31 March 2024. This
Both of these calculation errors were
corrected in the audited accounts. 
Page 148 of 214

Page 149

1. Audit of 2023/24 annual accounts | 11 
Issue Resolution 
resulted in the annual depreciation charge being
overstated by £10.4 million.
In addition, an error in the calculation of the
amount to transfer from the revaluation reserve to
compensate for the difference between current
value and historic cost depreciation resulted in the
adjustment being understated by £1.3 million.
2. Omission of additional pension contributions
for senior staff 
As explained in Exhibit 2, Point 3, we identified six
individuals whose early retiral/voluntary departure
had not been notified to the pension fund actuary.
We also identified that strain on the fund costs
associated with three of these individuals, who
formed part of the senior management team, had
not been properly disclosed as additional pension
contributions in the remuneration report. 
The pension disclosures for the affected
senior staff were amended in the
remuneration report in the audited
accounts.
Recommendation 1 
3. Classification error within non-current assets
We identified one asset classified as asset under
construction (AUC) which had been completed
prior to 31 March 2024, and consequently was mis-
classified within the annual accounts.
The asset was reclassified and revalued
within the audited accounts. This
resulted in a net decrease in the value
of property, plant, and equipment of
£0.549 million.
We undertook additional audit
procedures and confirmed that there
was no potential for material
misstatement from other AUC being
incorrectly classified.
4. Reporting of performance within the
management commentary
The management commentary contained within
the annual accounts should be fair, balanced,
understandable, comprehensive, and concise. Key
performance indicators (KPIs) should be
corroborated by supporting documentation.
We found that the standard of reporting in the
management commentary met the requirements
but could be improved with regard to performance
reporting.
The management commentary presented for audit
did not contain a summary of KPIs or any details of
how the council had performed against its targets.
Performance outcomes/achievements are instead
listed against each of the council’s priority areas.
These lack context. We also identified three of
The narrative within the outcome
disclosures was amended for the
audited accounts, and the 2023/24
performance summary section of the
management commentary was updated
to give a more balanced overview of the
council’s performance.
The council produces a separate Annual
Performance Report (APR) which has
been extensively improved as a result of
the council revisiting its performance
management framework during 2022/23
and 2023/24. It now provides readers
with a clear summary and detailed
analysis of the council’s targets and
performance against these. 
Page 149 of 214

Page 150

1. Audit of 2023/24 annual accounts | 12 
Issue Resolution 
these disclosures which could not be agreed to the
supporting documentation. 
A link to this APR was added to the
audited accounts.
Recommendation 2
5. Errors in group accounts 
The council consolidates its material group
components into group accounts included in the
financial statements. 
Our review of the group accounts in the unaudited
accounts identified an error in the consolidation of
the IAS 19 entries for one of the council’s
subsidiaries. As a result, net assets and reserves
were overstated by £2.1 million. 
The audited accounts were amended to
correct these misstatements. 
6. Statutory basis for reserves
Reserves held and operated by local government
bodies in Scotland are required to have a basis in
statute. Local authorities are not required to
establish a Capital Fund (CF), but the Code of
Practice on Local Authority Accounting in the UK
states that if an authority chooses not to have a
Capital Fund, then capital receipts require to be
credited to a Capital Receipts Reserve (CRR).
It is therefore expected that a CRR is only
established if a Capital Fund does not exist.
Mandatory LASAAC guidance issued in 2021
permits only one capital fund to be presented on
the face of the Movement in Reserves Statement
(MIRS).
Perth and Kinross Council operates both a Capital
Fund and a Capital Receipts Reserve, and present
both on the face of the MIRS. 
It is our view that this is not permitted under
statute.
We recommended that the Capital
Receipts Reserve be combined with the
Capital Fund, as only one such fund is
permitted under statute. If the council
wishes to maintain separation between
elements of the Capital Fund to record
capital receipts separately, this can be
done in a note to the accounts.
Officers do not agree with our
conclusions and did not amend the
presentation of the MIRS in the audited
accounts. 
7. Application of financial flexibility for service
concession arrangements
The Scottish Government introduced a series of
enhanced financial flexibility arrangements to
enable local authorities to vary proper accounting
practice and help mitigate the financial impact of
the Covid-19 pandemic. The council agreed to
apply the flexibility permitted by Local government
finance circular 10/2022 - finance leases and
service concession arrangements: statutory
guidance (PFI/PPP schemes) from 1 April 2023.
We are satisfied that the council has
correctly accounted for the permitted
financial flexibility for service concession
arrangements, and that the disclosures
in the audited accounts are compliant
with the requirements of the finance
circular.
This was judged to be a key audit
matter.
Page 150 of 214

Page 151

1. Audit of 2023/24 annual accounts | 13 
Issue Resolution 
This allows the associated debt to be repaid over
the life of the asset rather than the contract period
as per the previously mandated accounting
practice. 
The council has four of these schemes and applied
the flexibility to two of these (Investment in
Learning PPP arrangement for six school
community campuses, and the DBFM scheme for
Bertha Park High School). The retrospective
application of financial flexibility accounting
arrangements to these schemes resulted in a one-
off cumulative saving of £31 million which has
been added to usable reserves. 
We comment further on the financial impact of this
at paragraphs 48 and 49. 
Source: Audit Scotland
Total misstatements identified during the audit were £14.3
million and these have been adjusted 
18.  It is our responsibility to request that all misstatements, other than those
below the reporting threshold, are adjusted, although the final decision on
making the correction lies with those charged with governance.
19.  Total misstatements identified were £14.3 million which exceeds our
performance materiality threshold. We considered whether further audit
procedures were required. We reviewed the nature and causes of these
misstatements, which mainly related to council dwelling depreciation
calculations, the re-classification and revaluation of non-current assets, and an
error in the group pension disclosures. We have concluded that the issues have
been isolated and identified in their entirety and do not indicate further systemic
error. We considered whether other misstatements presented material risks of
misstatement in the relevant account area and concluded they did not.
20.  There are no unadjusted misstatements to report.
Our audit opinions on the connected charities’ financial
statements are unmodified 
21.  The council prepares connected charity accounts for six trusts registered as
Scottish charities, with net assets of £2.4 million. The preparation and audit of
financial statements of registered charities is regulated by the Charities and
Trustee Investment (Scotland) Act 2055 and the Charities Accounts (Scotland)
Regulations 2006. 
22.  We set a separate materiality for our audit of the connected charities. Our
initial assessment was carried out during the planning phase of the audit and
Page 151 of 214

Page 152

1. Audit of 2023/24 annual accounts | 14 
was based on the audited 2022/23 annual accounts. On receipt of the
unaudited 2023/24 annual accounts, we reconsidered our materiality levels
based on the financial results for the year ended 31 March 2024 and concluded
that they remained appropriate. Materiality amounts used for the audit are
detailed in Exhibit 4.
Exhibit 4
Materiality levels for the 2023/24 audit of the connected charities
Materiality level Amount
Overall materiality: this is the figure we calculate to assess the overall
impact of audit adjustments on the financial statements. For the year ended
31 March 2024 we have set our materiality at 2% of gross assets.
£45,000
Performance materiality: this acts as a trigger point. If the aggregate of
errors identified during the financial statements audit exceeds performance
materiality, this could indicate that further audit procedures should be
considered. Using our professional judgement, we have assessed
performance materiality at 75% of overall materiality.
£35,000
Reporting threshold: we are required to report to those charged with
governance on all unadjusted misstatements more than the ‘reporting
threshold' amount.
£2,250
Source: Audit Scotland 
23.  At the audit planning stage, we identified one significant risk of material
misstatement in relation to the audit of the connected charities. As stated in
International Standard on Auditing (UK) 240, management is in a unique
position to perpetrate fraud because of management’s ability to override
controls that otherwise appear to be operating effectively. 
24.  We undertook audit procedures designed to provide an appropriate level of
assurance over the transactions relating to the connected charities and did not
identify any material misstatements due to management override of controls. As
a result, our audit opinions on the connected charities’ financial statements are
unmodified. There were no significant findings to report to those charged with
governance.
Good progress was made on prior year recommendations 
25.  Our 2022/23 Annual Audit Report contained 6 recommendations for
improvement, which included two recommendations from our Best Value
thematic review of leadership in the development of the council’s strategic
priorities. The council has made good progress in implementing the agreed prior
year audit recommendations, with all but one fully addressed. For the actions
not yet fully implemented, revised responses and timescales have been agreed
with management and are set out in the Appendix. 
Page 152 of 214

Page 153

2. Financial management | 15 
2. Financial management
Financial management means having sound budgetary processes, and
the ability to understand the financial environment and whether internal
controls are operating effectively.
Main judgements 
The council’s budget setting and financial management arrangements operated
effectively during 2023/24. 
Excluding the one-off impact of service concession flexibility, the council reported
a £15.1 million (3.2 per cent) deficit on general fund services for 2023/24 which
was £20.2 million less than planned. The Housing Revenue Account balance
reduced by £0.4 million during 2023/24 due to the planned use of reserves (£0.3
million) and additional one-off costs identified during the year (£0.1 million).   
The council delivered 76 percent of its capital programme in 2023/24. External
debt levels remained relatively static during the year as the council had taken 
advantage of low borrowing rates in previous years and used these to fund capital
expenditure in 2023/24. 
Key financial controls operated effectively during 2023/24.
The council’s budget setting and financial management
arrangements operated effectively during 2023/24 
26.  The council has a well-established budget setting process that supports
members to develop and scrutinise plans and understand the impact of
proposed service changes. 
27.  On 1 March 2023, the council approved its 2023/24 general services
revenue budget. Budgeted net expenditure of £450.5 million was approved after
inclusion of budget pressures totalling £31.1 million and deduction of savings
totalling £6 million. The council used the following measures to balance its
budget:  
• increase Council Tax by 3.9 per cent or £3.8 million
• use of service concessions fiscal flexibility of £17 million
• use of reserves, including earmarked reserves, of £9.9 million. 
Page 153 of 214

Page 154

2. Financial management | 16 
28.  Subsequent adjustments throughout the year resulted in a revised net
budget at the year-end of £478.5 million and a planned contribution from
general fund reserves, including the service concession flexibility and
contributions to other reserves, of £39.7 million. 
29.  As part of our audit, we reviewed the council’s budget monitoring
arrangements and concluded that these are appropriate. Members of the
Finance and Resources Committee receive regular budget monitoring reports
which set out the main changes to the budget, the current and forecast out-turn
position, key variances and actions being taken to address these. 
Excluding the one-off impact of service concession flexibility,
the council reported a £15.1 million (3.2 per cent) deficit on
general fund services during 2023/24 which was £20.2 million
less than planned 
30.  The council reported a £15.1 million (3.2 per cent) deficit on general fund
services during 2023/24 which was funded from reserves. This was £20.2
million less than planned, mainly due to service underspends and receipt of
additional grant funding. The most significant underspends are detailed in
Exhibit 5.
Exhibit 5
Summary of significant under/overspends against budget
Service Area Underspend Main reasons for underspends 
Education and Children’s
Services 
£8.2 million £3.4 million of this relates to staff
vacancies and underspends on operational
budgets; £2.1 million to grant funding
received in 2023/24 for use in future years
which has been carried forward in
earmarked reserves; and £1.6 million is
due to reduced costs within Catering
Services and higher than anticipated
uptake of school meals. 
Communities £10.5 million The majority (£8 million) of this relates to
grant funding received in 2023/24 for use
in future years which has been carried
forward in earmarked reserves. The
remainder relates to staff vacancies (£1.4
million) and additional income (£1 million). 
Source: Perth and Kinross Council 2023/24 Annual Accounts
31.  The council also took advantage of service concession financial flexibility
arrangements during 2023/24 which resulted in a one-off increase in the
Page 154 of 214

Page 155

2. Financial management | 17 
General Fund balance of £34.3 million. This is further discussed at paragraphs
48 and 49. 
The Housing Revenue Account balance reduced by £0.4 million
during 2023/24 due to the planned use of reserves (£0.3 million)
and additional one-off costs identified during the year (£0.1
million)  
32.  The council is required by legislation to maintain a separate Housing
Revenue Account (HRA) and to ensure that rents are set at a level which
will at least cover the costs of its social housing provision. Rent levels are,
therefore, a direct consequence of the budget set for the year. In January
2023, the Housing and Social Wellbeing Committee approved a 2.2 per
cent increase in the average weekly rent levels for tenants for 2023/24.
The rent level set reflected the income required to fund the annual HRA
budget of £33.8 million.
33.  The HRA balance reduced by £0.4 million during 2023/24 due to the
planned use of reserves (£0.3 million) and additional one-off costs identified
during the year (£0.1 million) resulting in a balance of £2.3 million as at 31
March 2024. 
The council delivered 76 percent of its capital programme in
2023/24 
34.  The council approved a capital programme of £220.2 million (£198.7 million
for general fund projects and £21.5 million for HRA projects) for 2023/24. 
35.  Capital works amounting to £167.7 million (76 per cent) of the approved
programme) were completed during 2023/24. This included expenditure of
£47.4 million on school upgrade projects including replacement of Perth High
School; £72.8 million on roads and transport projects; £20.4 million on property,
infrastructure, and IT upgrades and £23.1 million on Housing Revenue Account
projects including new builds and buy-backs to increase the supply of council
dwellings. 
The council had taken advantage of low borrowing rates in
previous years and so external debt levels remained relatively
static during the year 
36.  The Capital Financing Requirement (CFR) identifies the borrowing required
to support the council’s capital investment plans. Actual borrowing may differ
from CFR if, for example, the council decides to borrow early to take advantage
of low interest rates on new borrowing. Any difference is managed within
working capital, and this may mean the council invests in short term
investments.
37.  During 2023/24 the council’s external debt levels increased by £18.6 million,
from £724.7 million at 31 March 2023 to £743.2 million at 31 March 2024. In
previous years, the council’s capital debt exceeded its Capital Financing
Requirement as the council had borrowed at low interest rates and held the
Page 155 of 214

Page 156

2. Financial management | 18 
balance in short-term investments, earning interest, until required to fund capital
expenditure. The council used its investments to fund the majority of its capital
expenditure this year and so its ratio of borrowing to CFR reduced to 91.1 per
cent in 2023/24 from 106.7 per cent last year. As a result, short-term
investments reduced to £36.6 million from £155.3 million in the previous year.
Key financial controls operated effectively during 2023/24
38.  As required by Audit Scotland’s Code of Audit Practice, as part of our audit
we identified and evaluated the key internal controls in the accounting systems.
Our objective was to gain assurance that it has systems of recording and
processing transactions which provide a sound basis for the preparation of the
financial statements. We concluded that the key controls in the main financial
systems were operating as expected but noted that an annual review of external
users of the Concerto estate management system is not routinely undertaken.
The council has advised that it will review its processes in response to our audit
finding. We also considered whether there was any impact on our audit opinion
and concluded that there was not, as compensating controls are in operation. 
39.  Last year we reported that there was one control that could be strengthened
(annual establishment checks) and recommended that management within
services should respond to these requests in a timely fashion. Our 2023/24
controls testing confirmed that all services responded to the 2023/24
establishment checks request within the required timeframe. 
Internal audit provided reasonable assurance on the council’s
framework of governance, risk management and control
40.  We considered internal audit’s annual report, presented to the Audit and
Risk Committee in June 2024, as part of our review of the Annual Governance
Statement within the 2023/24 annual accounts. This included internal audit’s
opinion that reasonable reliance can be placed on the council’s risk
management and governance arrangements, and systems of internal control for
2023/24, subject to management implementation of the agreed actions detailed
in the Internal Audit report. 
41.  The internal audit section had been operating under capacity for some time,
but two new staff members were recruited in May 2024 which returns the team
to full establishment level. We also note that the external review of internal
audit’s compliance with the Public Sector Internal Audit Standards is overdue
although the self-assessment has been completed. Plans are in place to
complete the external assessment with outcomes to be reported to the Audit
and Risk Committee in March 2025. 
Standards of conduct and arrangements for the prevention and
detection of fraud and error are appropriate 
42.  The council has a range of established procedures for preventing and
detecting fraud and irregularity including a whistleblowing policy, fraud and
corruption policy and codes of conduct for members and officers. We assessed
these arrangements to ensure that they were appropriate and that documents
Page 156 of 214

Page 157

2. Financial management | 19 
are readily available to staff and regularly reviewed to ensure they remain
relevant and current. Overall, we concluded that the council’s arrangements are
appropriate.
The council has well-established arrangements for
investigating and reporting data matches identified by the NFI
43.  The National Fraud Initiative (NFI) in Scotland is a counter-fraud exercise
coordinated by Audit Scotland which aims to prevent and detect fraud. It uses
computerised techniques to compare information about individuals held by
different public bodies, and on different financial systems, to identify 'matches'
that might suggest the existence of fraud or irregularity.
44.  The current NFI exercise ran over 2022/23 and 2023/24, and participating
bodies began to receive matches for investigation in January 2023. These
matches are categorised by risk and all recommended matches, plus any
further matches based on findings, should be investigated.
45.  The council has participated in the initiative for a number of years and has
well-established processes in place for investigating the data matches identified
by the NFI and reporting the results to the Audit and Risk Committee. The final
results of the NFI exercise were reported to the Audit and Risk Committee in
September 2024. 
46.  The next NFI exercise will take place in 2024/25, with datasets for matching
to be submitted in October and November 2024. The council has submitted all
the required datasets in accordance with the timetable. Matches for
investigation will be issued in December 2024 and January 2025. 
Page 157 of 214

Page 158

3. Financial sustainability | 20 
3. Financial sustainability
Financial Sustainability means being able to meet the needs of the
present without compromising the ability of future generations to meet
their own needs.
Main judgements 
The council’s general fund balance increased in the year due to the application of
the service concession financial flexibility accounting arrangements. The council
has used this to support its 2023/24 outturn and plans to use the remainder to
support its budgets through to 2027/28.   
The 2024/25 budget included a planned use of reserves of £13.8 million, but
subsequent amendments increased this to £28.1 million. 
The medium-term financial plan has not been updated since October 2023 and
will be reviewed following publication of the Scottish Government’s Medium-Term
Financial Strategy.  The council has yet to develop its revenue financial planning
beyond six years as recommended in the 2019 Best Value Assurance Report. 
The council’s capital investment programme totals £674 million over the next five
years. A Corporate Asset Management Framework has been approved to inform
investment decision-making. Following an updated options appraisal, the PH2O
project is going ahead on an alternative site.   
The Transformation and Change Programme is progressing in line with the
planned timetable. 
The council’s general fund balance increased in the year due to
the application of the service concession financial flexibility
accounting arrangements 
47.  As shown in Exhibit 6, the level of usable reserves held by the council
increased by £18.6 million during 2023/24, from £102.4 million at 31 March
2023 to £121 million at 31 March 2024. 
48.  The Scottish Government introduced a series of enhanced financial
flexibility arrangements to enable local authorities to vary proper accounting
practice and help mitigate the financial impact of the Covid-19 pandemic. The
council agreed to apply the flexibility permitted by Local government finance
circular 10/2022 - finance leases and service concession arrangements:
statutory guidance (PFI/PPP schemes) from 1 April 2023. This allows the
Page 158 of 214

Page 159

3. Financial sustainability | 21 
associated debt to be repaid over the life of the asset rather than the contract
period as per the previously mandated accounting practice.
49.  The council has four service concession schemes: the Pullar House
scheme, the Pullar House car park scheme, the Investment in Learning Public,
Private Partnership (PPP) scheme, and the Bertha Park High School Design,
Build, Finance and Maintain (DFBM) scheme. The Pullar House and Pullar
House car park schemes are due to end in September 2025 and have been
excluded from the reprofiling in line with the statutory guidance. The
retrospective application of financial flexibility accounting arrangements to the
remaining schemes resulted in a one-off cumulative saving of £34.3 million
during 2023/24 which has been added to usable reserves. This resulted in the
general fund balance increasing by £14.1 million during 2023/24, from £69.7
million at 31 March 2023 to £83.8 million at 31 March 2024. The impact on the
general fund balance was partly offset by the planned use of £15.1 million of
reserves to support the revenue budget position during the year and transfers
to/from statutory reserves of £5.1 million. 
50.  Of the total balance of usable reserves, £65.1 million (54 per cent) has been
earmarked by the council for specific areas of future spending including: £17
million of expenditure to be funded from Revenue Grants, £7.6 million for
expenditure on workforce management including transformation, £6.5 million of
expenditure on infrastructure and affordable housing funded from developers’
contributions and £5.6 million on affordable housing funded from council tax on
second homes.
51.  The unallocated general fund balance at 31 March 2024 was £18.7 million
which is in line with the council’s reserves strategy of holding between 2 per
cent and 4 per cent of its net revenue budget as uncommitted reserves.
Exhibit 6
Perth and Kinross Council usable reserves 
Reserve
31
March
2022 
(£m)
31
March
2023 
(£m)
31
March
2024 
(£m) 
General Fund – uncommitted  16.6 18.2 18.7 
General Fund – committed 69.3 51.6 65.1 
Total General Fund balance 85.9 69.8 83.8 
Housing Revenue Account  3.3 2.6 2.3 
Insurance Fund 1.4 1.3 1.7 
Capital grants unapplied account 0.1 0.1 0.1 
Page 159 of 214

Page 160

3. Financial sustainability | 22 
Reserve
31
March
2022 
(£m)
31
March
2023 
(£m)
31
March
2024 
(£m) 
Capital Fund (including Capital Receipts
Reserve)
27.3 28.6 33.1 
Total usable reserves 118.0 102.4 121.0 
The council used £17 million of the financial flexibility to
support its 2023/24 budget and plans to use the remainder to
support its budgets through to 2027/28 
52.  As noted at paragraphs 48 and 49, the council agreed to apply the service
concession financial flexibility accounting arrangements from 1 April 2023 which
resulted in a one-off cumulative saving of £31.2 million during 2023/24,
reflecting the retrospective impact of the change in accounting treatment (i.e.
the change in debt repayments that would have been made up to 1 April 2023
had the revised accounting treatment been applied to the council’s PPP scheme
and DFBM scheme from the start).
53.  In addition to the retrospective impact of the new accounting treatment, an
in-year saving of £3.1 million was also achieved in scheduled debt repayments
during 2023/24 due to the extended repayment period for the borrowing taken
for these PPP/DFBM schemes. Annual debt repayment ‘savings’ will also be
generated each year until the service concession arrangement contracts have
been repaid. However, statutory charges will then be made over the remaining
lives of the assets which would not have been required had the original
accounting treatment continued to be applied as this would have resulted in the
borrowing being fully repaid by the end of the contracts. Over the full lives of the
service concession arrangement the total capital repayments for the debt
liability remains the same under both approaches. 
54.  The council used £17 million of the financial flexibility to support its 2023/24
budget and created an earmarked reserve for the remaining £17.3 million as at
31 March 2024. The council plans to use the remaining flexibility, to support its
budgets for the next four years (2024/25 to 2027/28).  As noted above, this will
provide short-term benefit but will result in the council’s general fund being
charged for the cost of funding these assets until 2070.     
55.  It is important to note that this change in accounting treatment does not in
any way affect the existing contracts or any financial arrangements with the
parties operating these assets on behalf of the council. Charges will continue to
be paid as per contractual obligations over the agreed contract terms which
includes annual inflationary increases. Service concession assets will also
continue to be included on the council’s Balance Sheet.
Page 160 of 214

Page 161

3. Financial sustainability | 23 
The 2024/25 budget included a planned use of reserves of £13.8
million, but subsequent amendments increased this to £28.1
million
56.  On 28 February 2024, the council approved its 2024/25 general services
revenue budget. Budgeted net expenditure of £467.9 million was approved after
inclusion of budget pressures totalling £4.1 million and deduction of savings
totalling £8.7 million. The council used the following measures to balance its
budget:
• additional funding of £4.7 million received from the Scottish
Government to support the Council Tax freeze
• use of reserves, including earmarked reserves, of £13.8 million. 
57.  The council has subsequently updated its 2024/25 budget to reflect
increased expenditure funded from additional government grant (£7.5 million),
the impact of the 2023/24 outturn (£8.1 million) and additional expenditure to be
funded from earmarked reserves (£6.2 million). The revised budget totals
£490.5 million, of which £28.1 million will be funded from reserves (including
service concessions fiscal flexibility). 
Budget reports indicate an overspend of £1.1 million (0.2 per cent)
against 2024/25 budget
58.  The latest budget monitoring report (as at 20 November 2024) notes that
the council is projecting a small overspend of £1.1 million (0.2 percent) against
its budget.
The council approved a 6 per cent increase in rent levels for
2024/25
59.  In January 2024, the council approved a 6 percent increase in the average
weekly rent levels for tenants for 2024/25. The rent level set reflected the
income required to fund the annual HRA budget of £36 million.
60.  The approved budget included an allowance for staff pay increases of 3 per
cent for 2024/25 and the increased costs relating to the agreed 2023/24 pay
award. It also reflects the increased costs of building materials resulting from
current shortages. 
The medium-term financial plan was last updated in October
2023 and will be reviewed following publication of the Scottish
Government’s Medium-Term Financial Strategy
61.  The council last updated its Medium-Term Financial Plan (MTFP) in October
2023. The plan covers the six years to 31 March 2030 and considers a range of
key financial variables that impact on the council’s financial planning including
funding levels, inflation and pay awards. These are grouped together under
three scenarios: optimistic, mid-range and pessimistic and show that the council
needs to make cumulative budget reductions of between £7.6 million and £192
Page 161 of 214

Page 162

3. Financial sustainability | 24 
million by 31 March 2030. The council plans to update its MTFP following
publication of the Scottish Government’s Medium-Term Financial Strategy.
62.  The 2024/25 budget papers include provisional balanced budgets for
2025/26 and 2026/27. The council plans to use £4 million of the earmarked
service concession flexibility reserve to support both its 2025/26 and 2026/27
budgets with an additional £0.3 million of reserves required to fund the 2025/26
budget. The provisional budget for 2026/27 indicates that £2.9 million will be
available to add to uncommitted reserves during the year resulting in a net draw
on reserves of £1.1 million in 2026/27.  Reserves will not be required to support
the council’s recurring budget from 2027/28.  The budget paper acknowledges
that the assumptions used to prepare these budgets are subject to change and
that they will be revised as part of the council’s ongoing budget monitoring.
Contingencies of £1.4 million and £2 million respectively have been included to
cover unforeseen events such as cost pressures, service needs and income
shortfalls.  
The council has yet to develop its revenue financial planning
beyond six years as recommended in the 2019 Best Value
Assurance Report
63.  The 2019 Best Value Assurance Report recommended that the council
should build on its strong financial management and consider developing a
longer-term financial plan covering a five to ten-year period as part of its
modernisation agenda. The council has yet to develop its revenue financial
planning beyond six years. Capital investment planning now covers thirty years
but only six of these are funded (see paragraphs 67 to 69 below). 
The council’s capital investment programme totals £674 million
over the next five years
64.  The approved capital programme for 2024/25 to 2028/29 is £674 million,
split between £571 million of general fund projects and £103 million of housing
revenue account projects, with expenditure of £202.8 million (£175 million
general fund projects and £27.8 million HRA projects) scheduled for 2024/25.
Following an updated options appraisal, the PH2O project has
been reviewed and is going ahead on an alternative site
65.  Last year we reported that the council had paused the development and
delivery of one of its major capital projects (PH2O) due to inflationary cost
pressures. In September 2024, the council considered six options for the PH2O
project as part of a wider Perth City integrated investment proposal. Each option
was assessed against the critical success factors set out in the original
business case, and the preferred option, to construct a new-build facility on an
alternative smaller site, was approved by members. This together with the
previously approved removal of leisure water, ice and indoor bowling from the
project scope has resulted in estimated costs of £61 million compared to the
previous estimate for the original project of £90 million. The alternative site also
has the added benefit of allowing more housing to be built at the previous
preferred location. 
Page 162 of 214

Page 163

3. Financial sustainability | 25 
66.  The council’s other significant capital projects are on track to deliver on time
and within budget. The most significant of these is the Cross Tay Link Road
project, budgeted to cost £150 million and due to be completed in Spring 2025. 
The council has approved a Corporate Asset Management
Framework to inform investment decision-making
67.  We reported last year that the council was updating its corporate asset
management strategy and plan to inform investment decision-making; help
protect services and ensure that assets are optimised to achieve its strategic
aims and operational priorities. A revised Corporate Asset Management
Framework consisting of a policy, strategy and 30-year investment plan was
approved by the council in January 2024. 
68.  The plan provides a breakdown of the estimated long-term investment
requirements for the existing asset base and will inform the next update of the
medium-term financial plan. The first six years of the investment plan are
funded and form part of the council’s current capital programme to 31 March
2030. Current estimates are that the council needs to invest a further £2,594
million in its asset base over the remaining twenty-four years of the plan. 
69.  A new Strategic Investment Advisory Group has been established to ensure
a more collective approach to asset management and investment planning. This
group includes members and officers and will oversee the rolling 30-year
investment plan and assess and prioritise investment requests to ensure assets
are fit for purpose and that any investment is directed where it is most needed. 
The Transformation and Change Programme is progressing in
line with the planned timetable   
70.  The Council approved its Transformation and Change Strategy in June
2022 and developed a Transformation and Change Programme to deliver on
the vision of “a Perth and Kinross where everyone can live life well, free from
poverty and inequality”. The programme is phased over a 5-year period. Phase
1 completed in September 2024 and Phase 2 is now underway. 
71.  Phase 1 focused primarily on review of the Senior Leadership team and
consolidation of workstreams where areas of overlap or synergy were identified.
The Senior Leadership review was fully implemented by 01 April 2024 and is
expected to realise cumulative savings of £2.3 million by 2025/26. Consolidation
of workstreams focused on bringing historically disaggregated teams under
newly formed single points of management, to remove areas of duplication,
deliver financial savings and introduce greater consistency. It is expected to
deliver cumulative savings of £2 million by 2025/26.
72.  Phase 2 includes a Leadership Development programme and continues to
build on the Cultural Change programme which began in Phase 1 with a focus
on Employee Engagement, Leadership Development and Communications.
This includes employee workshops on strategic direction, values and
behaviours and a series of ‘masterclasses’ for all staff with line management
responsibilities. 
Page 163 of 214

Page 164

3. Financial sustainability | 26 
73.  A Transformation and Change Programme Management Office (PMO)
model will support the programme from Phase 2 onwards, replacing the
temporary team which has been in place since the Strategy was originally
approved in June 2022.
74.  We will continue to review and report on the council’s delivery of its
Transformation and Change Programme as part of our 2024/25 Best Value
Thematic report on ‘Transformation - how councils are redesigning and
delivering more efficient services to achieve planned outcomes’.
Page 164 of 214

Page 165

4. Best Value | 27 
4. Best Value 
Councils have a statutory duty to make arrangements to secure
continuous improvement in the performance of their functions.
Main judgements 
Our Best Value thematic review of workforce innovation confirmed that the council
has a workforce plan to support the delivery of its strategic objectives but has yet
to set targets against which to measure and report on progress. 
Two of the 2019 Best Value Assurance Report recommendations remain
outstanding and there has been limited reporting of progress to members or the
Executive Leadership Team.  
Best Value audit work is now fully integrated within our annual
audit work
75.  Councils have a statutory duty to make arrangements to secure continuous
improvement in the performance of their functions. Expectations are laid out in
the Best Value Revised Statutory Guidance 2020.
76.  As set out in the Code of Audit Practice, Best Value audit is integrated
within our annual audit work and will be assessed comprehensively over the
period of the audit appointment. This will include an annual evaluation of the
Council’s approach to demonstrating improvement in its services and public
performance reporting. We will also follow up findings reported previously on
Best Value to assess the pace and depth of improvement.
77.  As part of the new reporting arrangements, the Controller of Audit will also
report to the Accounts Commission on a council’s performance in meeting its
Best Value duties at least once every five years. Around eight councils are
selected each year for a Controller of Audit report. Perth and Kinross Council is
not included in the current year’s programme which is running from October
2024 to August 2025. 
For 2023/24 the Accounts Commission directed auditors to
conduct a Best Value thematic review of workforce innovation
and how councils are responding to workforce challenges
78.  For 2023/24 the Accounts Commission directed auditors to conduct a Best
Value thematic review of workforce innovation and how councils are responding
to workforce challenges through building capacity, increasing productivity and
Page 165 of 214

Page 166

4. Best Value | 28 
innovation. In carrying out the thematic work auditors considered the following
questions:
• How effectively are the council’s workforce plans integrated with its
strategic plans and priorities? 
• How effectively has digital technology been used to support workforce
productivity and improve service quality and outcomes?
• How effectively is the council using hybrid and remote working and other
innovative working practices such as a four-day week to achieve service
and staff benefits?
• What innovative practice is the council using to develop its future
workforce capacity and skills needs and manage staff reductions in line
with its priorities?
• What progress has the council made with sharing roles or functions across
its services and/or with other councils and partners? 
• How effectively is the council measuring the impact of its workforce
planning approach?
The council has a workforce plan to support the delivery of its
strategic objectives but has yet to set targets against which to
measure and report on progress  
79.  We issued our report on the Best Value Thematic Review 2023/24:
Workforce Innovation – How councils are responding to workforce challenges to
the council in September 2024, and it was considered by the Audit and Risk
Committee at the meeting on 30 September 2024. The key messages in the
report highlighted the following:
• The People and Culture Strategy 2024-28 sets out the council’s
approach to delivering sustainable workforce development. The strategy
is aligned with the council’s strategic plans and priorities and the council
engaged with staff across the organisation to develop the strategy. The
change to the Executive and Leadership structure and development of
the People and Culture team will support delivery of the actions in the
People and Culture Strategy 2024-28. Service workforce plans are being
developed and the council is developing its systems to provide access to
service level workforce data
• The council continues to invest in, build on and make extensive use of
digital technology to deliver workforce productivity benefits,
improvements in the efficiency of service delivery and better user
experience. Although there is some recorded impact of the related
workforce benefits and productivity gains, there is scope for these to be
more formally quantified
• The council has formalised hybrid working as part of its new flexible
working framework with over a quarter of the council’s workforce being
Page 166 of 214

Page 167

4. Best Value | 29 
classified as hybrid workers. The council has set out the intended
benefits from flexible working in its flexible working framework but has
not yet articulated how these will be measured. The council reported an
increase of over ten percent on spend on its use of casual workers
between 2022/23 and 2023/24
• Employees are generally positive about working for the council and the
relationship between the council and trades unions is good. In the main,
trades unions feel they are consulted with appropriately and their views
are taken into account
• The council is facing challenges with recruitment and retention of staff
and has initiatives in place to address this. It has introduced
programmes to develop staff skills and capacity
• The council is involved in an extensive number and variety of shared
services arrangements and partnerships across Tayside. The council
participates in various other partnerships outwith Tayside and shared
working arrangements that provide workforce-related benefits
• The council has agreed proposals to report to elected members
annually on the delivery and impact of the People and Culture Strategy
2024-28, but arrangements for reporting on service level workforce
plans are still to be finalised. The council is developing measures and
targets to monitor and report on progress against the People and
Culture Strategy 2024-28
80.  The report also included six recommendations for improvement which are
replicated in the Appendix. Action plan 2023/24
81.   of this report along with the council’s planned response, responsible
officers and dates for implementation. We will report on the council’s progress in
implementing these actions as part of our 2024/25 audit.
Two of the 2019 Best Value Assurance Report
recommendations remain outstanding and there has been
limited reporting of progress to members or the Executive
Leadership Team
82.  The Perth & Kinross Council Best Value Assurance Report (BVAR) was
published in August 2019. The report made eight recommendations for
improvement.
83.  Last year we reported that there was no formal reporting to committee of
progress against the Best Value Assurance Report’s recommendations, and that
reporting to management on progress had not been completed since June
2021. In response, management agreed to provide an annual update to
members and report six monthly to the Executive Leadership Team. We also
concluded that there had been slow progress in implementing some of these
actions, with the Covid-19 pandemic and revisions to Corporate Plans affecting
this, and that two were still outstanding in November last year:
Page 167 of 214

Page 168

4. Best Value | 30 
• the council should build on its strong financial management and
consider developing a longer-term financial plan covering a five to ten-
year period as part of its modernisation agenda 
• the ongoing review of the community planning partnership should be
wide-ranging and include the effectiveness of the board, outcome
delivery groups and the local action partnerships.
84.  The council has made limited progress with these outstanding
recommendations since we concluded our 2022/23 audit. As noted in paragraph
63, the council has yet to develop its revenue financial planning beyond six
years.  A further review of the Community Planning Partnership is ongoing and
is due to report in early 2025. As a result, we have concluded that these BVAR
recommendations are still outstanding. 
85.  A Best Value Performance Summary report was presented to the
Performance and Scrutiny Committee in September 2024 and to the full Council
meeting in October 2024 but contained little information on progress made
against the outstanding BVAR recommendations. Six monthly reporting to the
Executive Team has been delayed until 2025. Refer to the Appendix, point b/f 2
for revised date for implementation. 
Page 168 of 214

Page 169

5. Vision, leadership, governance, and use of resources | 31 
5. Vision, leadership,
governance, and use of
resources
Public sector bodies must have a clear vision and strategy and set
priorities for improvement. Through effective planning, they work
together with partners and communities to improve outcomes, make
best use of resources, and foster a culture of innovation.
Main judgements 
The council revised its service and senior leadership structure during the year as
part of its Transformation and Change Programme. 
The council has appropriate governance arrangements in place for delivery of its
plans.   
There has been an overall decline in LGBF performance indicators over the last 5
years, although performance relative to other councils is largely unchanged. KPI
trend analysis shows improvement in performance compared to last year. 
The council is compliant with the Accounts Commission’s SPI direction with
comprehensive performance information available via ‘PK Performs.’
The council revised its service and senior leadership structure
during the year
86.  As part of its Transformation and Change Programme, the council revised
its service structure during 2023/24 reducing from three services to two:
Strategy, People and Resources, and Economy, Place and Learning, plus the
Health and Social Care Partnership.
87.  The council further streamlined its executive level in August 2024 after the
Director of Economy, Place and Learning left the council. The Director post was
removed from the revised structure and the Chief Executive is now supported
by a Deputy Chief Executive and the Chief Officer for the Health and Social
Care Partnership. 
Page 169 of 214

Page 170

5. Vision, leadership, governance, and use of resources | 32 
88.  The operation and organisation of the Executive and Strategic Leadership
Teams continues to develop as part of the council’s wider Transformation and
Change Programme, and to ensure that it is aligned to the strategic objectives
and key priorities of the council. External support has been engaged to provide
learning and development opportunities as part of this development process.
89.  The council acknowledges that the restructure has resulted in the loss of
skilled and experienced officers at a senior level. Key officers at service
manager and team leader level have also been left through retiral or moving to
opportunities elsewhere. The council intends to manage the resulting risk
through an ongoing programme of leadership redesign and development. 
Appropriate governance arrangements were in place during
2023/24
90.  We reviewed the council’s governance arrangements during the year and
concluded that they are appropriate and support effective scrutiny, governance,
and transparency.
91.  There is, however, scope to strengthen council officer compliance with
governance arrangements regarding activity undertaken outwith their council
employment. We were notified of one instance of a senior officer participating in
a marketing video for a local business. Further investigation confirmed this
business supplied goods and services to the council. Council procedures
require senior officers to declare any activity which might give rise to a potential
conflict of interest. The activity was not declared by the officer.  
92.  There is a risk of perceived bias when awarding contracts for good or
services if the council is not fully transparent in disclosing and addressing
potential conflicts of interest. Senior officers should be reminded of the need to
disclose activity which might create, or be perceived to create, a conflict of
interest with their council role.
Recommendation 3
Senior officers should be reminded of the need to disclose all activity which might
be, or perceived to be, in conflict with their council role.
The council is open and transparent
93.  The council continues to be open and transparent, with agendas, reports
and meeting minutes published on the council website. Members of the public
are able to attend meetings of the council and its committees, and livestreaming
of council meetings is available for those unable to attend in person.
94.  The council website is regularly refreshed and kept up to date. Residents,
businesses, and visitors to the area can access a wide range of information,
including councillor registers of interest, and senior officer gifts and hospitality
registers. The public are also able to access a variety of online council services.
This includes functionality to pay bills, report problems or request repairs.
Page 170 of 214

Page 171

5. Vision, leadership, governance, and use of resources | 33 
95.  The council makes its annual accounts available on its website. These
include a management commentary which gives a good summary of the
council’s financial performance for the year.
Procurement and commissioning were identified as an area for
change and improvement in the Transformation and Change
Programme
96.  The Sustainable Procurement Strategy 2024-2029 has been designed to
provide additional economic, social, and environmental benefits to the people of
Perth and Kinross, whilst procuring what the council requires to deliver its
services. The strategy was approved at the full Council meeting on 26 June
2024.
97.  The strategy is based on six guiding principles of Accountability, Equity,
Legal Compliance, Strategic Importance, Sustainability and Value Delivery.
These are underpinned by six strategic procurement aims which are well
aligned to the Corporate Plan. The strategy aims to lead sustainable public
procurement that “empowers our communities, fuels local economic growth,
sparks innovation, and protects our planet.”
98.  An implementation plan for the strategy is under development. Reporting
will be annually to the Finance and Resources Committee, and we will monitor
progress as part of our 2024/25 annual audit. 
99.  As well as annual procurement reporting, the council publishes a yearly
‘Following the public pound’ report, which details the level of spend and funding
granted to ALEOs and other external organisations. The public can make
enquiries about any of the specific items of activity listed in the report, helping to
ensure transparency and accountability.
100.  Similar transparency is seen within Note 13 of the 2023/24 annual accounts
which lists monies paid out in support of various local organisations and grants
awarded to third parties, allowing the public to form a view on where and how
the council is providing support.
A performance framework aligned to the Corporate Plan is now
well established
101.  The Best Value Revised Statutory Guidance 2020 sets out that councils
should be able to demonstrate a trend of improvement over time in delivering
their strategic priorities. The guidance also notes that performance
management arrangements should promote the effective use of the local
authority’s resources, which includes effective performance reporting.
102.  As reported in our 2022/23 Best Value thematic review, performance
reporting was revised in August 2023 following approval of the Corporate Plan.
The revised performance framework identified 53 key indicators against the
seven priorities of the Corporate Plan. For 2023/24, this increased to 54
following approval of an additional key indicator during 2023. 
Page 171 of 214

Page 172

5. Vision, leadership, governance, and use of resources | 34 
103.  The Annual Performance Report (APR) is considered at the Scrutiny and
Performance Committee each year and by full Council. Reporting includes an
Executive Summary which provides a helpful overview of key performance
measures (KPI) trends for each strategic priority. Supporting information is
available via the PK Performs section of the council’s website.
104.  Targets have now been set for all but 4 of the KPIs for which it would be
appropriate to set a target. 2023/24 performance was mixed, with 15 of the KPI
targets met and 15 not met. Trend analysis paints a slightly more favourable
position, with 32 KPIs trending in a positive direction, 14 in a negative direction
and 6 static. Trend data is not available for 2 of the KPIs.
105.  Despite 50 per cent of KPI targets not being met, trend data suggest
performance against the priority areas identified in the Corporate Plan is
generally improving, as summarised in Exhibit 7.
Exhibit 7
Progress against Corporate Plan priorities
Corporate Plan Priority Number
of KPIs
Target
met
Target
not met
Target
N/A
Overall
trend
Tackling poverty 7 3 2 2 Improving  
Tackling climate change and
supporting greener sustainable
places
7 1 4 2 Improving
Developing a resilient, stronger,
and greener local economy
10* 3 4 3 Improving
Enabling our children and young
people to achieve their full
potential
9 - - 9 Improving
Protecting and caring for our
most vulnerable people
8 1 3 4 Static
Supporting and promoting
physical and mental wellbeing
6 2 1 3 Static
Working in partnership with
communities
7 5 1 1 Improving
Total  54 15 15 24 Improving
*includes 1 new indicator agreed in 2023, for which data will not be available until December
2024 
Source: Perth and Kinross Council Annual Performance Report 2023/24 
Page 172 of 214

Page 173

5. Vision, leadership, governance, and use of resources | 35 
106.  The greatest success is seen against the ‘Working in partnership with
communities’ priority, with 5 of the 7 KPIs meeting target. Of the remaining 2, 1
KPI (Number of participation requests) has no target set, and the other (Number
of community groups supported to increase their capacity) is within 5 per cent of
the target, although there is a noticeable decrease in performance compared to
2022/23 where performance exceeded the current target level by 27 per cent.
The apparent decline in performance is attributed to smarter reporting
mechanisms, preventing groups in receipt of support across multiple areas from
being over-counted. The 2023/24 figures are therefore considered to be more
accurate. 
107.  The Annual Performance Report notes that whilst KPI trends are indicative
of performance, they need to be considered within the context of the wider
operating environment which includes factors which the council can and cannot
influence. Overall, the Annual Performance Report is clear and well-presented,
with improvement actions identified which feed into a corporate improvement
plan for the year.
A Corporate Development and Improvement Plan is in place
108.  A Corporate Development and Improvement Plan (CDIP) was approved in
May 2024, as part of the council’s revised strategic planning and performance
framework. The CDIP is set at organisational level and replaces the previous
service-by-service approach. 
109.  The CDIP details the activities to be undertaken to address areas for
development identified in the 2023/24 APR. It is presented towards the start of
the financial year, allowing for better scrutiny of improvement activity throughout
the year. Mid-year progress was reported to the Scrutiny and Performance
Committee in September 2024 and the year-end position will be reported as
part of the Annual Performance Report for 2024/25.
Performance compared to other councils has remained broadly
static over the last 5 years
110.  A Local Government Benchmarking Framework (LGBF) briefing is
provided to members each year. The most recent was issued to members in
March 2024. It provided a summary of the most recently published data and a
link to the National Benchmarking Overview Report, which primarily relates to
2022/23 data.
111.  The briefing reports that since the base year, 60 per cent of the council’s
indicators have improved and 36 per cent have declined. Whilst this is an
overall positive picture, the briefing notes an overall increase in the proportion of
indicators showing negative trends, a decline which is mirrored by national long-
term trends since 2014/15.
112.  Since April 2024, the Improvement Service have issued monthly data
updates and Exhibit 8 shows how the council has performed based upon the
latest dataset as published in October 2024. Financial and satisfaction
indicators are not included, as these are not directly comparable between
councils. Indicators without full data have also been excluded.
Page 173 of 214

Page 174

5. Vision, leadership, governance, and use of resources | 36 
113.  We analysed a total of 50 indicators over a 5-year period, from 2018/19 to
2022/23. Over this period, 17 performance indicators improved (34 per cent)
and 27 declined (54 per cent). This is consistent with the picture seen across
Scotland. In their National Benchmarking Overview Report 2022-23, the
Improvement Service note that 2022/23 is the first year in which the rate of
decline has overtaken the rate of improvement, with fiscal, workforce and
demand pressures beginning to have an impact on service performance.
Exhibit 8
Select LGBF data comparison to the 31 other Scottish councils 
Source: Audit Scotland analysis of LGBF data available at October 2024 
16% 16% 20% 18% 16%
30% 36% 28% 32% 30%
30%
30% 28% 28% 38%
24% 18% 24% 22% 16%
0%
20%
40%
60%
80%
100%
2018/19 2019/20 2020/21 2021/22 2022/23
4th quartile 3rd quartile 2nd quartile 1st quartile
Page 174 of 214

Page 175

5. Vision, leadership, governance, and use of resources | 37 
114.  Performance relative to other councils in Scotland has been broadly static
over the 5-year period. There has been a decline in the number of indicators in
the first quartile, but an increase in the number in the second quartile. In
2018/19, 54 per cent of indicators were in the top two quartiles and this
remained the case in 2022/23.
115.  Areas of notable improvement include:
• Corporate Services indicator 11: Proportion of SWF budget spent.
The council has improved 21 places since 2018/19 and is now the 3rd
ranked council in Scotland
• Corporate Services Asset indicator 01: Proportion of operational
buildings that are suitable for their current use. The council is now
ranked 3rd compared to 20th in 2018/19, an improvement of 17 places.
116.  Areas of notable decline include:
• Adult Social Care Services indicator 07: Proportion of adult care
services graded good or better: The council has dropped 17 places in
the rankings, from 7th in 2018/19 to 24th in 2022/23. 
• Financial Sustainability indicator 01: Total useable reserves as a
percentage of council annual budgeted revenue. This has declined by
13 places, with the Council now ranked 18th in Scotland in 2022/23,
compared to 5th in 2018/19.
• Corporate Services indicator 06b: Sickness absence days per
employee (non-teacher). The council was ranked highest in Scotland in
2018/19 but is placed 14th in the 2022/23 data.
The council is compliant with the Accounts Commission’s SPI
direction 
117.  The Accounts Commission’s 2021 Statutory Performance Direction defines
the performance information that councils must publish. The Commission does
not prescribe how councils should report this information but expects them to
provide the public with fair, balanced, and engaging performance information.
The Direction applies for 3 years from 2022/23 and is therefore in force for the
2023/24 financial year.
118.  Under the direction, a council must report its:
• performance in improving local public services (including those provided
with its partners and communities), and progress against agreed
desired outcomes (SPI 1). The Commission expects this reporting to
allow comparison both over time and with other similar bodies (drawing
on Local Government Benchmarking Framework and/or other
benchmarking activities) 
Page 175 of 214

Page 176

5. Vision, leadership, governance, and use of resources | 38 
• own assessment and audit, scrutiny, and inspection body assessments
of how it is performing against its duty of Best Value and how it has
responded to these assessments (SPI 2). 
119.  Based on the reporting of performance as detailed above, and our review
of compliance with Best Value duties as detailed in Section 4, we have
concluded that the council has complied with the Direction for 2023/24. The
Annual Performance Report provides a clear and balanced overview of
performance, including trend analysis, and the PK Performs website provides
members of the public with easy access to more detailed performance
information. 
Page 176 of 214

Page 177

Appendix. Action plan 2023/24 | 39 
Appendix. Action plan 2023/24 
2023/24 recommendations 
Issue/risk Recommendation  Agreed management
action/timing
1. Communication with
Tayside Pension Fund
actuary
Council officers do not
communicate directly with the
Tayside Pension Fund,
relying instead on Dundee
City Council (DCC) as the
administering authority.
Our audit found that
information on early
retirement and voluntary
severance of 6 individuals
was not communicated to the
actuary by DCC. The
omissions could have been
readily identified through
detailed review of the
curtailment cost information
included in the IAS19 report
received from the actuary and
associated supporting
documents.
Risk - whilst this did not
result in a material error in
the accounts, future
significant levels of voluntary
severance or early retirals
could lead to errors through
incomplete information being
provided to the actuary.
Officers should review the
information provided by the
pension fund actuary for
consistency with their own
understanding of voluntary
severance and early retirals
approved in year.
Discrepancies identified
should be raised with DCC
contacts for communication
to the pension fund actuary.
Exhibit 2, Point 3 
Officers will review early
retirals as part of their
management review of the
pension disclosures for the
accounts.
Council officers will also
engage with Dundee City
Council to ensure that the
information is provided to the
actuary.
Responsible officer:
Corporate Accounting
Manager
Agreed date: 31 May 2025 
2. Performance reporting in
the Management
Commentary
Reporting of performance in
the Management
The Annual Performance
Report (APR) presented to
the Scrutiny and Performance
committee in September
each year contains details of
KPIs and targets, with a clear
Agreed to meet with Audit
Scotland early in the 2024/25
process and review
disclosure requirements.
Page 177 of 214

Page 178

Appendix. Action plan 2023/24 | 40 
Issue/risk Recommendation  Agreed management
action/timing
Commentary could be
improved through the
inclusion of KPIs and a
summary of how the council
has performed with respect to
its targets for the year.
The existing presentation lists
a series of ‘outcomes’ which
lack context and do not give
users of the accounts a
sense of whether
performance is improving,
declining, or static. 
Risk – the Management
Commentary does not
provide a balanced view of
performance.
summary of whether targets
have been met and an
analysis of whether the trend
over time is one of
improvement or decline.
Performance reporting in the
Management Commentary
can be improved through
summarising performance in
relation to KPIs and targets
as presented in the APR.
The use of graphs and trend
analysis in public
performance reporting should
also be considered for
inclusion, as recommended
by the Accounts Commission.
Exhibit 3, Point 4 
Responsible officer:
Strategic Lead – Strategic
Planning, People and
Performance
Agreed date: June 2025
3. Senior Officer
compliance with
governance procedures
A senior officer participated in
a marketing video for a local
business which supplies
goods and services to the
council. Council procedures
require senior officers to
declare any activity which
might give rise to a potential
conflict of interest. The
activity was not declared by
the officer.    
Risk – the council is
perceived to be biased when
awarding contracts for goods
or services. 
Senior officers should be
reminded of the need to
disclose all activity which
might be, or perceived to be,
in conflict with their council
role. 
Paragraph 90 to 91 
Agreed to remind Senior
officers of procedures for
disclosing conflict of interest
or other works.
Responsible officer:
Strategic Lead – Strategic
Planning, People and
Performance
Agreed date: January 2025
Recommendations from the Best Value thematic review 2023/24 
Issue/risk Recommendation  Agreed management
action/timing
BV1. Service level
workforce plans
The council should ensure its
service level workforce
planning measures align with
Management
response/agreed action: 
Page 178 of 214

Page 179

Appendix. Action plan 2023/24 | 41 
Issue/risk Recommendation  Agreed management
action/timing
Service workforce plans are
being developed and the
council is developing its
systems to provide access to
service level workforce data.
Risk - the council may fail to
deliver on the People and
Culture Strategy. 
actions in the People and
Culture Strategy 2024-28
action plan as well as
agreeing any additional
service level workforce
measures. 
This is part of the remit of the
Workforce Planning Themed
Board who will monitor and
agree actions within the
People and Culture Strategy.
HSCP has a separate
Strategy and governance and
reporting arrangement in
place.
Education and Learning
undertakes annual staffing
exercise. All other Strategic
leads will develop their own
service workforce plans that
will be collectively reviewed
at the Workforce Planning
Themed Board, ELT, and
Committee. 
Responsible officer: Strategic
Lead – Strategic Planning,
People and Performance 
Agreed date: Ongoing and
annual update to Finance and
Resources Committee
BV2. Quantifying workforce
benefits from the
introduction of digital
technology
The council has established
many workforce benefits and
productivity gains of its digital
technology improvements but
there is scope for more of
these to be quantified. 
Risk - there is a risk that the
council does not fully
understand the workforce
benefits from digital
technology improvements to
inform future decision-
making. 
The council should build on
the work it has done to date
to demonstrate and quantify
what workforce benefits and
productivity gains have been
made through its use of
digital technology. 
Management
response/agreed action:  
The Council will continue to
grow the culture of
embedding a standardised
approach to Benefits
Realisation: baselining
service delivery costs and
related “softer” metrics at the
start of any improvement
journey to ensure the impact
of digital technology and new
ways of working is maximised
for improving efficiency of our
workforce and outcomes for
employees and citizens of
Perth and Kinross.
Responsible officer: Strategic
Lead for Customer and
Digital Services
Agreed date: December 2025
Page 179 of 214

Page 180

Appendix. Action plan 2023/24 | 42 
Issue/risk Recommendation  Agreed management
action/timing
BV3. Flexible working
benefits
Although the council’s flexible
working framework contains a
section on how the council
will measure effectiveness of
the framework, no specifics
are provided in relation to
how this will be done.
Risk - there is a risk the
council is not aware of the
impact of flexible working on
wellbeing and productivity. 
The council should develop
measures to assess the
impact of its flexible working
framework on staff
productivity, wellbeing, and
service performance to
ensure these are being
maintained or improved. 
Management
response/agreed action:  
Strategic Leadership Team,
Performance Improvement
Team and People and
Culture team will devise
arrangements to capture
qualitative and quantifiable
data via pulse surveys,
employee survey actions and
feedback. Consideration will
be given to how this can be
captured via data and
technology i.e. PK Performs
to provide a standard
approach in terms of
performance monitoring.
Responsible officer:
Strategic Lead – Strategic
Planning, People and
Performance  
Agreed date: September
2025.
BV4. Workforce-related
benefits from shared
service arrangements
There will be inherent
workforce related benefits
arising from each of the
shared working arrangements
that the council has with its
partners in Tayside and
further afield. 
Risk - Lessons are not
learned and applied when
creating new, or developing
existing, shared working
arrangements. The council
may not be utilising
opportunities for shared
services and collaboration
opportunities across partner
organisations. 
The council should develop a
formalised analysis of the
workforce-related benefits
arising from shared service
arrangements and further
explore additional
opportunities for shared
service arrangements.
Management
response/agreed action:  
The Workforce Planning
Themed Board will determine
an approach to identify
agreed measures and
performance monitoring
arrangements. 
Responsible officer:
Strategic Lead – Strategic
Planning, People and
Performance
Agreed date: September
2025. 
Page 180 of 214

Page 181

Appendix. Action plan 2023/24 | 43 
Issue/risk Recommendation  Agreed management
action/timing
BV5. Monitoring and
reporting on service level
workforce plans
The council will need to set
out its approach to monitoring
and reporting on service level
workforce plans.
Risk – service level
workforce planning
arrangements may not be
supporting the delivery of the
People and Culture Strategy.
The council should set out its
arrangements for monitoring
and reporting on service level
workforce plans. 
Management
response/agreed action:  
This will be discussed with
the Workforce Planning
Themed Board to agree how
to take this forward in respect
of monitoring progress and
reporting arrangements. 
Responsible officer:
Strategic Lead – Strategic
Planning, People and
Performance
Agreed date: March 2025
BV6. Measuring the impact
of workforce planning
The council has still to
develop measures and
targets to monitor and report
on progress against the
workforce plan.
Risk - workforce planning
arrangements may not be
supporting the delivery of the
council’s strategic priorities. 
The council should further
develop SMART measures
and targets to assess the
impact and effectiveness of
its workforce planning actions
in the People and Culture
Strategy 2024-28.
Management
response/agreed action:  
This will be discussed with
the Workforce Planning
Themed Board to agree how
to take this forward in respect
of identifying measures to
monitor progress, refreshing
new or emerging priorities
and reporting arrangements. 
Responsible officer:
Strategic Lead – Strategic
Planning, People and
Performance
Agreed date: June 2025. 
Follow-up of prior year recommendations
Recommendation Agreed Management
Action and Timing 
Progress
2022/23 audit recommendations
b/f 1. Non-current asset
valuations
We recommend that the
council reviews its approach
to the rolling programme of
asset valuations and refines
its process for considering
Officers have agreed to meet
with audit to review
arrangements for asset
valuations and those not
included in the rolling
programme to provide a
Implemented
Officers met with audit ahead
of the 2023/24 revaluation
exercise and agreed to bring
forward the valuation of PFI
campuses and council
Page 181 of 214

Page 182

Appendix. Action plan 2023/24 | 44 
Recommendation Agreed Management
Action and Timing 
Progress
the current valuation of
assets (OLB and Housing)
not subject to a full valuation
process at each year end. 
The current process for other
land and buildings is highly
detailed and labour intensive
and could benefit from
simplification. 
robust position for the
2023/24 accounts. 
Responsible officer:
Corporate Accounting
Manager 
Agreed date: 31 December
2023 
dwellings into the 2023/24
valuation cycle.
Going forward, an annual
indexation percentage,
provided by the expert valuer,
will be applied to council
dwellings to reduce the risk of
material misstatement arising
in the years between formal
valuations.
The process for reviewing
movement in the value of
other land and buildings since
the last formal revaluation
remains very detailed.
Council officers are content to
continue with this approach.
No further action to be taken.
b/f 2. Completeness of non-
current assets
We recommend that the
council prepares a
reconciliation between the
financial ledger, asset
register and valuer’s report as
part of the working papers
package in future years. 
Officers will reconcile the
financial ledger at 1 April
annually and reconcile the
valuer’s report to asset
register as part of the working
papers. 
Responsible officer:
Corporate Accounting
Manager 
Agreed date: 30 June 2024 
Implemented 
A reconciliation between the
asset register and the
valuer’s report was provided
as part of the working papers
package supplied to support
the 2023/24 audit. 
The asset register was
reconciled separately to the
financial ledger.
b/f 3. Working papers
Management should review
processes for generating the
financial statements,
providing clear cross
references and links between
(and within) working papers,
and the source data used to
create them. 
Officers will meet with
auditors to review the
simplification of working
papers to improve audit
efficiency. 
Responsible officer:
Corporate Accounting
Manager 
Agreed date: 31 January
2024 
Implemented 
Officers met with audit
following the 2022/23 audit
completion and took on board
audit recommendations to
modify the working papers. A
further meeting was held prior
to the 2023/24 audit to
explain the changes made.
The 2023/24 working papers
showed good improvement in
some areas, with many now
containing linkages and
cross-references to
supporting information.
Page 182 of 214

Page 183

Appendix. Action plan 2023/24 | 45 
Recommendation Agreed Management
Action and Timing 
Progress
b/f 4. Establishment checks
Establishment checks are an
important anti-fraud control
and are carried out annually.
Management within services
should ensure they respond
in timely fashion to the
request for confirmation. 
Officers will ensure that all
returns not completed are
highlighted to appropriate line
managers for action. Any
outstanding returns post
December will be escalated
to Strategic Lead – Finance
and Business Support for
action. 
Responsible officer:
Corporate HR Manager 
Agreed date: 31 December
2023 
Implemented 
2023/24 establishment
checks for all service areas
were completed and
responded to in the required
timeframe. 
Best Value Thematic Review 2022/23 recommendations
BV b/f 1. Workforce
planning
The council should revise the
workforce plan. This should
set out the challenges facing
the council workforce; data in
terms of workforce numbers,
deployment, age profile; and
risks and actions in individual
employment groups.
A detailed People and
Culture Plan will be taken to
the Finance and Resources
Committee by June 2024. 
Responsible Officer:
Strategic Lead – Strategic
Planning, People and
Performance 
Target date: 30 June 2024 
Implemented 
The People and Culture
Strategy 2024-28 was
approved by the Finance and
Resources Committee on 12
June 2024.
The Strategy is aligned with
the council’s strategic plans
and priorities and sets out the
council’s approach to
delivering sustainable
workforce development.
We comment further on the
People and Culture Strategy
2024-28 in our Best Value
Thematic Review on
Workforce innovation – how
councils are responding to
workforce challenges.
BV b/f 2. Best Value
Reporting
The council should implement
a process for routinely
reporting Best Value action
plan progress to committee. 
An annual update will be
provided through the
Corporate Annual
Performance Report which is
reported to the Scrutiny and
Performance Committee and
the Council in September.
This will also sit on our
website as part of the
supporting information which
Outstanding  
Refer paragraph 78
Responsible officer:
Strategic lead – Strategic
Planning, people and
Performance
Revised date: 31 March
2025                     
Page 183 of 214

Page 184

Appendix. Action plan 2023/24 | 46 
Recommendation Agreed Management
Action and Timing 
Progress
is accessible to the public. In
addition, we will report six
monthly to the Executive
Leadership Team. 
Responsible Officer:
Strategic Lead – Strategic
Planning, People and
Performance 
Target date: 30 September
2024 
Page 184 of 214

Page 185

Appendix. Action plan 2023/24 | 47  
Perth and Kinross Council
Draft 2023/24 Annual Audit Report 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
Page 185 of 214

Page 186

Page 186 of 214

Page 187

Audit & Risk Committee 
2 December 2024 
INTERNAL AUDIT UPDATE 
Report by Chief Internal Auditor
(Report No 24/341) 
1. PURPOSE 
1.1 This report presents a summary of Internal Audit’s work undertaken as part of
the Internal Audit Plans for 2023/24 and 2024/25. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee notes progress with Internal Audit
activity 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Background
• Section 5:  Progress Update
• Section 6: Global Internal Audit Standards
• Appendix 
4. BACKGROUND 
4.1 The Public Sector Internal Audit Standards (PSIAS) require that the Chief
Internal Auditor reports periodically to the Audit Committee on internal audit
activity and on performance relative to the approved plan. 
4.2 Work has continued on assignments from Perth & Kinross Council’s Internal
Audit Plans. In addition, work has continued to be undertaken in connection
with the Internal Audit provision for Perth & Kinross’ Integration Joint Board. 
4.3 In line with the timetable as laid down by Audit Scotland, all relevant datasets
have been uploaded to enable the National Fraud Initiative matches to take
place nationally. These matches should be made available shortly for officers
to commence investigations. 
5. PROGRESS UPDATE 
5.1 Appendix 1 shows the status of audits arising from the Internal Audit Plans.
5
Page 187 of 214

Page 188

5.2 Internal Audit is currently involved with further areas of unplanned work,
including investigating a whistleblowing disclosure. If any control issues arise
as a result of these, reports will be presented to the Audit & Risk Committee. 
6. GLOBAL INTERNAL AUDIT STANDARDS (GIAS) 
6.1  New Global Internal Audit Standards (GIAS) were published earlier this year
and will come into effect on 1 April 2025. The Chief Internal Auditor has
responded to consultations from CIPFA regarding their application within the
public sector. The final Application Note, along with the Code of Practice for
the Governance for Internal Audit, will be published within the coming months,
and these will be shared with this Committee. In the meantime, the Chief
Internal Auditor is reviewing how Internal Audit will comply with the GIAS in
the initial and subsequent years. 
6.2  The GIAS will place obligations on this Committee, as the Audit Committee as
defined within the Standards, and the Committee will be briefed on these
obligations and a development session held to ensure that these are fully
understood. 
Authors
Name  Designation Contact Details
Jackie Clark  Chief Internal Auditor InternalAudit@pkc.gov.uk 
APPENDICES 
• Appendix 1 Internal Audit Activity 
Page 188 of 214

Page 189

Appendix 1
INTERNAL AUDIT UPDATE
Internal Audit Activity 
Audit
No.
Title Lead Service(s) Status as at
November
2023
Audit
Committee
2023/24    
C23-02 Mosaic Corporate / HSCP /
ECS
Ongoing June 2025
A23-03 Local Employability
Partnership
Communities Ongoing March 2025
A23-04 Child Poverty Communities Completed September
2024     
2024/25    
A24-01 Business Continuity   March 2025
A24-02 Financial
Sustainability
Finance & Business
Support
Ongoing March 2025
A24-03 Multi Agency
Safeguarding Hub
Children, Families &
Justice 
March 2025
A24-04 Affordable Housing Housing &
Communities
Ongoing March 2025
A24-05 Procurement Legal & Governance;   June 2025
C24-06 3rd Sector Review All Services Ongoing March 2025
A24-07  Credit Cards Finance & Business
Support
Completed December
2024 
5
Page 189 of 214

Page 190

Page 190 of 214

Page 191

1 
Internal Audit Report
All Services
24 - 07 Credit Card Usage
November 2024 
Final Report
(Report No. 24/342) 
Legal and Governance
Corporate and Democratic Services
Perth & Kinross Council
Council Offices
2 High Street 
Perth
PH1 5PH 
6
Page 191 of 214

Page 192

2 
24-07 Credit Card Usage
Contents by Section 
1. Introduction
2. Executive Summary         
3. Audit Background Information        
4. Scope and Limitations         
5. Assessment of the Control Environment      
6. Summary of Findings         
7. Conclusions          
8. Acknowledgement         
9. Action Implementation & Follow Up     
10. Management Action Plan 
11. Authorisation
12. Distribution
13. Assessment Definitions 
Page 192 of 214

Page 193

3 
1.  Introduction 
1.1 The audit of Credit Card Usage was undertaken as part of the Internal Audit
Plan for 2024-2025, which was approved by the Audit & Performance
Committee on 24 June 2024. The period under review for the purposes of the
audit exercise was financial years 2022-23 to 2024-25. 
1.2  The indicative scope for the audit was to review the appropriate use of the
authorised credit card and adherence to the financial regulations, procurement
policy and other relevant finance procedures. 
2.  Executive Summary 
2.1  The audit has found that reasonable assurance can be placed on the Council’s
internal controls in relation to credit card usage, the auditor cannot, at this point,
properly assess best value or the extent to which the commissioned services
are delivering the desired outcomes. 
2.2  There are 5 actions arising from the findings in Section 6. An action plan is
included at Section 10. Once these actions are completed, Internal Audit should
be able to place substantial assurance on the arrangements in place. 
3.  Audit Background Information 
3.1  This assignment forms part of the Internal Audit plan for 2024-25, approved by
the Audit Committee on 24 June 2024. The period under review for the
purposes of the audit exercise was financial years 2022-23 and 2023-
24.  Please note, that due to the financial years reviewed, the report refers to
strategic areas in place prior to the recent leadership restructure.   
3.2 The Council’s credit card facility is administered by the central services team in
Finance & Business Support. The use of credit cards is governed by the
Financial Regulations 2023-26, which state the following: 
8.5    The operation of credit card facilities or similar payment methods by the
Council requires the prior approval of the Head of Finance (Chief Finance
Officer), who may issue additional guidance on the procedures to be
followed.   
Page 193 of 214

Page 194

4 
9.12 The Head of Finance* is responsible for all debit and credit card
transactions. Any income stream that accepts card payments must use
a Payment Card Industry Data Security Standards compliant system. All
card processing systems require approval of the Head of Finance and
the Head of Legal and Governance Services. 
11.10  The Head of Finance* will specify the records to be kept in respect of
purchasing or credit card transactions. 
11.22  It will be the Intelligent Client* who will ensure that any purchase made
within their service by a credit card is valid and appropriate and the
transaction is properly accounted for. The Intelligent Client should
ensure periodic compliance checks are undertaken (as a minimum this
must be completed annually). 
*  It is to be noted that as from April 2024 the role of Head of Finance was
replaced within the leadership structure with the Strategic Lead for Finance &
Business Support and the Intelligent Client role was superseded by a new role
of Business Finance Partner. 
3.3 In addition to the Financial Regulations, there are Credit Card Guidelines,
written in 2017, that show the standard operating procedure for the use of credit
cards. 
3.4 The Senior Income Officer in Finance & Business Support has administrative
oversight for credit card deployment. The Finance Management Team
approves all credit users.   
3.5 There are nominated staff in Services who hold credit cards, with varying
different limit values.  The senior manager for each relevant service has
responsibility for expenditure and use of the credit card held by their services.   
3.6 Since January 2024 all finance teams have been under the management of the
Strategic Lead for Finance & Business Support. 
4.  Scope and Limitations 
4.1 The Audit reviewed appropriate use of authorised credit cards and user's
adherence to the financial regulations, procurement policy and other relevant
finance procedures.   
4.2 There were no limitations identified that would impact the Audit. However, no
checks were made of the accuracy of credit card reconciliation or journal entries
passed in the Integra system.  
Page 194 of 214

Page 195

5 
4.3 The audit referred to information from published regulations and guidelines.   
4.4 In order to validate the operational process against the published standard
operating procedure relevant staff were interviewed and a review of
documentary evidence was undertaken. 
4.5 A sample audit of purchases and the reconciliation process was conducted. 
4.6  The details of the control objectives reviewed and Internal Audit’s assessment
of their strength of control in each area is contained within Section 5 of this
report.
5.  Assessment of the Control Environment 
5.1  The table below contains a summary of the findings against each control
objective and Internal Audit’s assessment of the adequacy and effectiveness of
the controls in place to meet each of the objectives agreed for this audit.  Further
details, including any improvement actions, are set out in the Management
Action Plan. 
NB: Where there are no actions identified against an objective there is no action
rating applicable, only an overall control objective assessment. 
No. Control Objective Action Rating  Control
Objective
Assessment 5 4 3 2 1
1 To ensure there are sufficient
controls in place to assure the
appropriate deployment and
security of credit cards in use.   
1  Substantial
Assurance
2 To ensure there are sufficient
controls in place to assure the
appropriate use of credit cards in
purchasing goods and services out
with the PECOS system.   
2  Reasonable
Assurance
3 To ensure there are sufficient
controls in place to enable
reconciliation of purchases made
and sufficient budget monitoring.     
Substantial
Assurance 
5.2    The auditor has assessed that reasonable assurance can be placed on controls
overall in relation to credit card usage from the audit. Meaning: 
Page 195 of 214

Page 196

6 
There is a generally sound system of governance, risk management and control
in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited. 
5.3     A summary of the key findings and actions are provided in section 6, please
note however, the following areas of good practice which have been highlighted
during the audit. 
5.3.1 Individual training is given to each new credit card holder on behalf of the
allocated Financial Controller (Business Partner) for that Service. This is
supplemented with credit card guidelines issued to all new credit card holders
who are required to confirm they have read and understood them. 
5.3.2 The Finance and Governance Team Leader in the former Communities
contextualises the Credit Card Guidelines to the relevant team in that service. 
5.3.3 In Communities when a credit card holder went on maternity leave the staff
members card was temporarily stopped at the bank by the Senior Incomes
Officer and the card was handed in and is kept in the Finance Team’ safe until
the member of staff returns to work. 
5.3.4  During COVID 19, due to office closure, the Finance Officer who administers
housing purchases developed an e-form for emergency purchase retrospective
approval.  This enabled the purchase request form, authorisation and receipts
to be scanned and attached to the same form. This system remains in use
today. 
5.3.5 All purchases requests within the former Education and Children’s Services are
sent to the contracts team for validation prior to being sent to the credit card
holder for purchasing. 
6.  Summary of Findings 
6.1  Below is a summary of key findings and actions, which are reflected in the
Management Action Plan, detailed in section 10.   
6.2  Controls in place to assure the deployment and security of credit cards 
6.2.1 The audit examined whether there were staff in named roles to ensure the
safeguarding and use of credit cards; whether the council had sufficient controls
in place to provide security should a card be lost or stolen, or no longer needed
due to staff leaving or changing roles; and whether sufficient training and
controls were in place to assure staff had awareness of credit card security and
fraud prevention.
Page 196 of 214

Page 197

7 
6.2.2 The Financial Regulations stipulate the named roles relevant to the use of credit
card for purchasing goods and services.  These are supported by the Credit
Card Guidelines. 
6.2.3 The published Financial Regulations were written and last reviewed in May
2023. It was noted this version did not reflect the recent changes to the
leadership structure. A revised version for 2024-2027 has now been approved
by Council in October 2024.  
6.2.4 The Credit Card Guidelines were written and last reviewed in 2017 and had not
been revised to reflect the recent changes to the leadership structure. 
[Action point 1] 
6.2.5 Other relevant guidance, such as the Counter Fraud and Corruption Strategy,
is published on the Financial Matters and Guidance page on ERIC. 
6.2.6 However, it was noted that information on fraud and corruption was not
highlighted to staff when training was given. 
[Action point 2] 
6.2.7 The Council holds insurance through Fidelity Guarantee Insurance that covers
fraud, theft of money, etc. 
6.2.8 At the time of audit, there were 73 credit cards issued to council staff.    
6.2.9  It was noted that 16 staff on the list of credit card holders in 2023-24 had not
used their cards over the past year (or more) and 8 had only been used once. 
An audit showed that these cards are held by Officers for emergency use i.e.
where a card holder is not available to make a purchase out of hours, or when
a card holder is absent from work (sick or holiday leave). This was not therefore
considered a risk.    
6.2.10 Credit cards are held by individual staff and can be taken off the Council office
premises. The payment card security system does not allow card holder details
or card numbers to be held on the Council system. Thus, staff must have access
to them when out of office.  Card holders are informed of their responsibility to
keep the card safe and must sign (via an email) that they have read and
understood the Credit Card Guidelines.   
6.2.11 A credit card holder is responsible for informing the bank if a card is lost or
stolen or there were anomalies on the statement.  
6.2.12 There is a process in place to inform the Senior Incomes Officer in a timely
manner when a member of staff is leaving the Council or moves role and no
longer has authority to have a credit card, although this appears to be a d hoc.
Page 197 of 214

Page 198

8 
[Action point 3]
6.2.13 Overall, the auditor concluded there are sufficient controls in place to assure
deployment and security of credit cards. 
6.3 Controls are in place to assure the appropriate use of credit cards in
purchasing goods and services out with the PECOS system 
6.3.1 The audit reviewed whether standard operating procedures were being
followed at each process step by relevant staff and whether there were
sufficient controls in place to 
a) ensure the integrity of a budget holder, who may also be a credit card holder,
when making a purchase,
b) assure a conflict of interest was reported and mitigated for and 
c) safeguard against the misuse or fraudulent use of credit cards and dispute
management.
6.3.2 The audit found that all services follow the standard operating procedures for
the purchase of goods/services by credit cards.  However, since COVID-19 the
form to request a payment by credit card has not been used by all staff.  Instead,
an email request that holds all relevant information has been sent and
accepted.  Although this is out with the current credit card guidance it is
recommended that the standard operating procedure be revised with a view to
digitalising the process. 
[Action point 1]
6.3.3 Good practice was noted where an e-form was developed for Housing Officers
to complete during COVID-19 for emergency purchase, that allowed scanned
receipts to be uploaded into it, and retrospective budget holder approval to be
added. 
6.3.4 Further, good practice was noted where all requests for purchase by credit
cards within Education and Children’s Service were sent to the service
contracts team to check and validate the request is appropriate to be purchased
by credit card, that the code is the correct one for that purchase, and the budget
holder has authorisation for that purchase.  If any anomalies are found the
request is rejected.  
6.3.5 All Services have a process whereby a purchase is questioned if it can be
bought through PECOS instead.  A budget holder may still insist that this be
purchased but they would need to provide a rationale in writing as to why.
6.3.6 All purchases are required to have a receipt or invoice saved with the initial
request, or a rationale as to why one isn’t available. Evidence of this practice
was noted in the financial audit. 
Page 198 of 214

Page 199

9 
6.3.7 Not all receipts/invoices are saved to EDMS at the time of purchase, but rather
saved to a local folder or personal email and uploaded to EDMS at point of
reconciliation. This is seen as a risk if the person is off work at time of
reconciliation. It would be considered better practice for all purchase
documentation to be saved directly to EDMS as point of purchase.
[Action point 1] 
6.3.8 Whilst a budget holder may in theory be able to authorise their own purchase
request, all services have a process whereby another budget holder would
approve a purchase in that situation.
6.3.9 Conflict of Interest is not part of the training for a credit card holder and no
current process is followed by services to mitigate against a known conflict. It
is felt there is a risk where a purchase is made on behalf of a person or company
known personally by the credit card holder and no action is taken to mitigate
this risk.   
[Action point 2]
6.3.10 Overall, the auditor concluded there are sufficient controls in place to safeguard
against the misuse or fraudulent use of credit cards and dispute management.   
6.4 Controls in place to enable reconciliation of purchases made and
sufficient budget monitoring 
6.4.1 The audit reviewed whether the reconciliation process was performed on a
regular basis, by the appropriate staff members, and if there was regular
management reporting to enable sufficient oversight and understanding of
purchases made by credit card. 
6.4.2 The audit found that the Senior Incomes Officer (SIO) upon receiving monthly
bank statements allocates a spend amount, relevant to each service, to a
service specific suspense account.  The SIO then distributes the relevant
statements to the delegated officer in each Service, as well an individual
statement to each credit card holder.  
6.4.3 Each credit card holder is responsible for reconciling their purchases against
the statement and providing all relevant documentation to the financial
controller in their service.   
6.4.4 The reconciliation process checked all purchases shown on the statement
against the purchase request, receipts and/or invoices by the credit card holder. 
Anomalies are checked back with the budget holder and raised to the attention
of the Finance Controller.  
6.4.5 Firstly, a journal entry is made for each purchase with a description of that
purchase noted.  The journal ledger shows the relevant budget code.
Page 199 of 214

Page 200

10 
6.4.6 Secondly, a check and/or sample audit is made by a Finance Officer before the
reconciliation journal is finalised and approved. Where a Finance Officer is a
credit card holder, their reconciliation is double checked by another Finance
Officer. 
6.4.7 Thirdly, the journal is checked and signed off by the delegated officer. Once
approved it is imported to the Integra finance system to ensure payment is
allocated to the correct budget code and the suspense account cleared back to
zero.
6.4.8 Overall the auditor found that reconciliation was performed on a regular basis,
by the appropriate staff members, and the process was robust.
6.4.9 It is to be noted that credit card spend is not committed from the budget at the
time of purchase, unlike PECOS, but rather at the time of reconciliation, which
could be up to 2 months later. No management reports can be which provide a
budget holder with oversight of these purchases until reconciliation has taken
place. The Finance team stated that they do not consider this to be a material
risk, due to the low volumes of transactions accounted for in this manner.
6.4.10 The reconciliation journal is reviewed and approved by the delegated officer in
each Service on a monthly basis. 
7.  Conclusion
7.1  The Internal Audit review can place reasonable assurance on the overall control
environment for credit card usage. The agreed actions, once implemented,
should enable Internal Audit to place Substantial Assurance on these. 
8.  Acknowledgements 
8.1  Internal Audit would like to thank all officers who were involved in this audit,
particularly the Senior Incomes Officer, and the officers who undertake the role
of Financial Controller in each Service.   
9.  Action Implementation & Follow up 
9.1  Responsibility for the maintenance of adequate and effective controls rests with
management. Where the audit has identified areas for management action,
these are identified in the Management Action Plan. Where a decision is taken
by management not to act in response to finding from this review, it is the
responsibility of management to assess and accept the risk arising from non-
implementation. 
9.2  Achievement of the agreed actions is monitored through Internal Audit’s ‘follow
up’ arrangements.
Page 200 of 214

Page 201

11 
10.  Management Action Plan
Action
Point
Para.
No Finding Risk
Rating Agreed Action & Evidence Action Owner
Target
Completion
Date
1  
6.2.4 
6.3.2 
6.3.7
Guidelines:
There is scope to update and
improve the Credit Card
Guidelines as a result of the
following:
The Credit Card Guidelines were
written and last reviewed in 2017
and do not reflect the recent
changes to the leadership
structure, nor changes to working
practice since COVID19.
Processes developed over time
and as a result of changing
practices during the COVID
pandemic and the request to
purchase by credit card form is
not always being used, instead an
email request is accepted.  
Not all receipts/invoices are
saved to EDMS at the time of
purchase, but rather may be
saved to a local folder or held on
personal email. They are only
uploaded to EDMS at the point of
reconciliation. 
2 Agreed action: 
The Senior Accountant will update
the Credit Card Guidelines to reflect
the change in leadership structure,
as well as reflecting on the working
practice relevant to the standard
operating procedure. 
Agreed evidence: 
Updated Guidelines 
J Jennings,
Senior
Accountant 
March 2025
Page 201 of 214

Page 202

12 
2 
6.2.6 
6.3.9
Training
It was noted that information on
fraud and corruption was not
highlighted to staff when training
was given. 
Conflict of Interest is not part of
the training for a credit card
holder and no current process is
followed in Services to mitigate
against a known conflict. 
2 Agreed action: 
The Senior Accountant will update
the training information to signpost
staff to the Finance matters and
guidance site on ERIC, with
particular reference to the Counter
Fraud and Corruption Strategy. He
will also signpost to the Employee
Code of Conduct, Conflict of Interest
procedure. All current credit card
holders will be reminded of the need
to follow this process to mitigate risk. 
Agreed evidence
Updated guidance 
J Jennings,
Senior
Accountant 
March 2025 
3 6.2.12 The process to inform the Senior
Incomes Officer in a timely
manner when a member of staff
is leaving the Council or moves
role and no longer has authority
to have a credit card appears ad
hoc.  
2 Agreed action: 
The Incomes Team will remind
managers to inform their delegated
finance officer and the Senior Income
Officer in Finance Business Services
as soon as a member of their team,
who is a credit card holder, has
handed in their notice or it is known
they will change roles and no longer
require a credit card. 
Agreed evidence: 
Communication with credit card
holders 
J Jennings,
Senior
Accountant 
March 2025 
Page 202 of 214

Page 203

13 
10.  Authorisation 
10.1 The auditor for this assignment was J Borley.  The supervising auditor was D
Arachchilage. 
This report is authorised for issue: J Clark 
11.  Distribution 
11.1 This report has been distributed to:
T Glen, Chief Executive  
C Mailer, Depute Chief Executive
L Simpson, Strategic Lead, Legal and Governance
S Walker, Strategic Lead – Finance & Business Support
C Robertson, Central Services Manager, Accountancy 
A O’Brien, Service Manager, Accountancy 
J Jennings, Senior Accountant, CDS Accountancy 
Page 203 of 214

Page 204

14 
12.  Assessment Definitions 
12.1 The following table contains the definitions of the control objective assessment. 
Control Objective Assessment
Level of assurance Definition
Substantial Assurance A sound system of governance, risk management and control
exist, with internal controls operating effectively and being
consistently applied to support the achievement of objectives in
the area audited.
Reasonable Assurance There is a generally sound system of governance, risk
management and control in place. Some issues, non-compliance
or scope for improvement were identified which may put at risk
the achievement of objectives in the area audited.
Limited Assurance Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk
management and control to effectively manage risks to the
achievement of objectives in the area audited.
No Assurance Immediate action is required to address fundamental gaps,
weaknesses or non-compliance identified. The system of
governance, risk management and control is inadequate to
effectively manage risks to the achievement of objectives in the
area audited. 
12.2 The following table contains the definitions applied by Internal Audit in rating
audit findings/actions. 
Risk Rating for Individual Findings
Rating Rating
description
Definition
5 Critical Significant observations/ major concerns which require
immediate action. Management will need to add these to the
appropriate Service risk register.
Issue represents a control weakness which could cause, or is
causing, severe disruption of the process or severe adverse
effect on the ability to achieve process objectives
4 High Significant observations regarding the absence / failure of key
controls requiring urgent action. Management should consider
adding these to the appropriate Service/ divisional risk register
Issue represents a control weakness which could have, or is
having, major adverse effect on the ability to achieve process
objectives 
Page 204 of 214

Page 205

15 
Risk Rating for Individual Findings
Rating Rating
description
Definition
3 Medium Observations regarding the effectiveness of key controls
requiring reasonably urgent action. Management should consider
these when updating any divisional / team risk registers
Issue represents a control weakness which could have, or is
having, significant adverse effect on the ability to achieve process
objectives
2 Low Minor observations regarding the adequacy of controls which
require action to improve the efficiency, effectiveness, or
economy of operations or which otherwise require to be brought
to the attention of Senior Management
Issue represents a minor control weakness with minimal but
reportable impact on the ability to achieve process objectives
1 Trivial / Minor Very minor observations which will be raised during the audit and
may not be included within the final report
Issue represents a very minor control weakness with negligible
impact on the ability to achieve process objectives. The issue will
be raised during the audit and may not be included within the final
report. 
Page 205 of 214

Page 206

Page 206 of 214

Page 207

Audit & Risk Committee 
2 December 2024 
INTERNAL AUDIT FOLLOW UP 
Report by Chief Internal Auditor
(Report No 24/343) 
1. PURPOSE 
1.1 This report presents a current summary of Internal Audit’s ‘follow up’ work
relating to actions due for completion up to October 2024. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee notes the current position in respect of
the agreed actions arising from Internal Audit’s work. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Background
• Section 5:  Follow Up Outcomes 
4. BACKGROUND 
4.1 The Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to establish a follow-up process to monitor and ensure that
management actions have been effectively implemented.   
4.2 Internal Audit request evidence from Services which confirms that actions
have been implemented and, therefore, controls have been improved. 
5. FOLLOW UP OUTCOMES 
5.1 There were 11 actions due to be completed up to October 2024. Three
actions have been verified by Internal Audit as having been satisfactorily
completed. The eight remaining actions have revised completion dates, as
detailed in the Appendix 1 and 2. Appendix 2 contains actions which were
previously considered in private session of the Audit & Risk Committee. 
Author
Name  Designation Contact Details
Jackie Clark Chief Internal Auditor InternalAudit@pkc.gov.uk 
7
Page 207 of 214

Page 208

Page 208 of 214

Page 209

Appendix 1
Actions with a completion date up to October 2024 which have yet to be completed
Finding Action  Action owner
& Service
Date(s) Current status Internal
Audit
Opinion
21-05 Tay Cities Region Deal 
Action Point : 1
Importance: Medium
Audit Committee Date: 26 Jun
2023 
Dundee City Council has
previously undertaken an audit
and the outcomes were shared
with PKC Internal Audit during
this review. A further high-level
review of progress of projects
and compliance with grant
offer guidance is underway at
present and the outcome will
also be shared. A summary of
their findings from the former
was shared with the TCRD
Joint Committee as well as
their own Council Committee.
Consideration should be given
to making these assurances
available to relevant officers,
elected members via an
appropriate Committee in
Perth & Kinross
The Service Manager will
ascertain what assurance
reports are provided
regarding the Tay Cities
Region Deal [TCRD] and
ensure that the outcomes
are shared with relevant
officers and elected
members in Perth &
Kinross Council as part of
the annual reporting
process. 
A Seggie,
Economic
Development
Manager 
Oct 2023 
Mar 2024 
Aug 2024 
Feb 2025
The Service is
proposing to address
this action by providing
an Elected Member
briefing containing all
the relevant
information, with links
to the next Annual
Report which is due to
be finalised by
February 2025. 
Accepted
7
Page 209 of 214

Page 210

Finding Action  Action owner
& Service
Date(s) Current status Internal
Audit
Opinion
22-02 - Climate Change 
Action Point: 4
Importance: High
Audit Committee Date: 25 Mar
2024 
Lack of resources both
financial and capacity: 
Lack of resources both
financial and capacity. The
Council has identified 25
actions as top priority and
funding was provided for these
25 top priorities. However, we
noted from our review of the
Master Action Plan that 9, of
these top priority actions had
available resources, 7 had
partial resources (i.e. for
feasibility / design), and 9 were
without allocated resources. 
The Climate Change &
Smart Investment Manager
will support the Climate
Change Board to review
the actions to ensure that
resourcing is appropriately
reflected to deliver these
top priority actions. 
S Merone,
Climate
Change &
Smart
Investment
Manager 
Sep 2024
Dec 2024 
The responsibility for
this action now lies
with P Leonard,
Climate Change and
Zero Waste Manager. 
The top 25 priority
actions have recently
been reviewed by
Elected Members and
members of the
Climate Commission,
in separate
workshops. These
priorities will be
presented to Council
on 4 December 2024
as part of the Annual
Climate Action Report
and Action Plan
Update. 
Satisfactory
Page 210 of 214

Page 211

Finding Action  Action owner
& Service
Date(s) Current status Internal
Audit
Opinion
The Climate Change
and Sustainability
Group has replaced
the previous Board
structure, and this
Group will be
assessing the
resources required to
support the revised top
25 priority actions on
18 November. 
A copy of the outcome
of this meeting with be
provided to internal
audit colleagues for
review.’ 
23-06 - Fuel 
Action Point : 1.1
Importance: High
Audit Committee Date: 25 Mar
2024 
The monthly audit lapsed
during the covid pandemic
and has not recommenced
following the Fleet
Manager leaving. 1. A
quarterly audit of all the
depots fuel will be carried
out by Fleet Manager. 
P Taggart,
Fleet Manager
Apr 2024 
Aug 2024 
Dec 2024
Work has been
undertaken on
hardware and software
up to Sep 2024, with
resources dedicated to
address the concerns. 
Accepted
Page 211 of 214

Page 212

Finding Action  Action owner
& Service
Date(s) Current status Internal
Audit
Opinion
Monthly Fuel Audit: 
The Fuel Policy requires a
monthly audit to be carried out
by Fleet Management with a
comparison being made
between actual fuel held in
tanks and that expected within
the FuelTran system. Fleet
Management informed us that
this exercise has not been
completed since the COVID
pandemic, but recognise that
this is a key control in
identifying discrepancies,
which should be
re established
Any discrepancies will be
identified, investigated and
any adjustments will be
recorded with a reason and
signed off by Fleet
Manager. 
An audit was
completed 30 Sep
2024, however, there
are still incorrect
readings showing
between hardware and
software. 
Fleet are continuing to
engage with providers
but are still not able to
confirm that the
systems are effectively
working the way they
should. 
A further update will
follow on progress in
December 2024. 
23-06 - Fuel 
Action Point : 2.1 
Importance: High
Audit Committee Date: 25 Mar
2024 
A record of any changes
will be kept and any
adjustments will be
reviewed and verified by an
officer designated by the
Fleet Manager. Following
this, a yearly audit will be
carried out.
A Brown,
Assistant Fleet
Manager
Apr 2024
Aug 2024
Dec 2024 
This action will be
completed once the
relevant information
has been received
from FuelTran as per
the AP1.1 (see
above). 
Accepted
Page 212 of 214

Page 213

Finding Action  Action owner
& Service
Date(s) Current status Internal
Audit
Opinion
There is no oversight of the
manual adjustments made in
the system as they are as they
are not reported to Fleet
Management nor investigated 
Any issues cannot be
signed off on until 
both systems are
working effectively.
23-06 - Fuel 
Action Point : 6 
Importance: Medium
Audit Committee Date: 25 Mar
2024 
Pump readings:
Pump readings should be
recorded for each delivery,
however this has not been
possible in all cases because
of a broken gage at the
Friarton pump. Fleet
Management was not aware of
this fault. 
Fleet Management will
ensure that the broken
gauge is fixed, as part of
an existing service
contract. If required, new
fuel gauges will be fitted
which will be connected to
the fuel tanks and new
gauges fitted to the fuel
pumps. 
When gauges are fitted,
the Service will arrange to
carry out a calibration test
of the gauges every 6
months. 
A yearly audit will take
place at each financial year
and will be recorded.
P Taggart,
Fleet Manager
Sep 2024
Apr 2025
The broken guage was
fixed. However, further
work carried out by
Service revealed the
calibration tests are
still not accurate. 
The Service is in
onward discussion
with the supplier. 
Accepted 
Page 213 of 214

Page 214

Page 214 of 214