Democracy Spraffa

Saulmore Bay Resort Ltd: Proposal of Application Notice for Marina; Boatyard (Including Ancillary Offices (Class 4) and Store (Class 6)); Leisure Resort (Including Buildings for Leisure Use (Class 11), Retail (Class 1) and Restaurant/Cafe (Class 3)); Holiday Lodges (Sui Generis); and Other Holiday Accommodation Types (Sui Generis); New Roads, Walkways/Cycleways; and Related Drainage and Other Infrastructure: Camus Bruaich, Ruaidhe, Connel (Ref: 23/01040/Pan)

Argyll and Bute Council · 23 August 2023
Back to Planning, Protective Services and Licensing Committee — 23 August 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Development and Economic Growth   
PROPOSAL OF APPLICATION NOTICE (PAN)
____________________________________________________________________________   
Reference:  23/01040/PAN 
Applicant: Saulmore Bay Resort Ltd 
Proposal: Proposal of Application Notice for Marina; boatyard (including ancillary offices
(Class 4) and Store (Class 6)); leisure resort (including buildings for leisure use
(Class 11), retail (Class 1) and restaurant/ café (Class 3)); holiday lodges (sui
generis); and other holiday accommodation types (sui generis); new roads,
walkways/ cycleways; and related drainage and other infrastructure. 
Site Address: Camus Bruaich, Ruaidhe, Connel, Argyll and Bute
____________________________________________________________________________ 
1.0 INTRODUCTION 
Proposal of Application Notices only relate to National and Major Applications as defined
by the Government’s planning hierarchy and are a statutory requirement prior to the
submission of the planning application. The PAN heralds the start of a minimum 12 week
period to allow for community consultation before an application can be lodged. 
In considering this item, Members should restrict comments to issues relating to the
material considerations which may be relevant in the determination of the proposed
development and should refrain from expressing opinion as to the likely acceptability of
development in advance of any subsequent application being presented for determination.
Any opinions or views expressed by Councillor’s at the pre-application stage must be
made mindful of the overarching requirements of fairness, impartiality and of keeping an
open mind. The process provides opportunity for Officers to give feedback to the
prospective applicant on issues which Members would wish to see addressed within the
planning application submission. 
The submitted information includes:
 Proposal of Application Notice
 Location Plan 
The applicant has set out in detail their proposals to ensure sufficient opportunity is
provided for the community to view and comment on the proposals in advance of the
submission of a formal planning application. 
The applicants have confirmed the following consultation steps will be undertaken: 
a) Consultation letters to be sent to Connel Community Council and the Oban North and
Lorn Ward Councillors.
b) Two public meetings will be held at Connel Village Hall.
c) A press notice will be placed in the Oban Times, together with posters displayed in
Connel village and leaflets to be delivered to near neighbours.

Page 2

Officers consider that the steps set out in the PAN are acceptable. 
2.0 DESCRIPTION OF PROPOSED DEVELOPMENT 
Based on the description of the development contained within the proposal of application
notice, the forthcoming application is anticipated to comprise of the following mix of land
uses: 
 Construction of Marina and boatyard; including ancillary offices (Class 4) and store
(Class 6);
 Construction of a Leisure Resort- including buildings for leisure use (Class 11), retail
(Class 1) and restaurant/Café (Class 3);
 Erection of Holiday lodges (Sui Generis);
 Erection of other holiday accommodation types (Sui Generis);
 Installation of new infrastructure including roads, walkways and cycleways, drainage
and other utilities related infrastructure.
 Landscaping works 
The applicant has alongside the submission of this PAN, sought formal pre-application
advice from the Planning Authority via the Pre-Application Advice Service for Major
Developments. 
It was recommended as part of that pre-application advice, that the applicant seeks an
Environmental Impact Assessment (EIA) Screening Opinion and Scoping Opinion as the
proposal would appear to exceed a number of the thresholds identified in Schedule 2, Part
12 Tourism and Leisure of the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017. 
3.0 SITE DESCRIPTION 
The proposed site is located within open countryside adjacent to the western settlement
boundary of Connel and to the north of the A85, around Camus Bruaich Ruaidhe bay
(Loch Etive). The site includes craggy upland, areas of woodland with semi-improved
grassland as well as bog and rocky coastal margins close to Loch Etive. The landform is
undulating with a series of folds and shallow valleys and covers an area in excess of 8ha.
The site is located within a rural area with scattered countryside housing and nearby
settlements of Connel and Dunbeg. 
The site has a limited planning history with no recent permissions within the last 10 years. 
4.0 DEVELOPMENT PLAN POLICY 
This is not a planning application and therefore does not require evaluating and
determining in accordance with Section 25 of the Planning Act against the Development
Plan and its policies. However, in considering the merits of this PAN, a number of
Development Plan Policy considerations are relevant. The policies to be considered
include: 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy

Page 3

NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings
NPF4 Policy 10 – Coastal Development
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 20 – Blue and Green Infrastructure
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 26 – Business and Industry
NPF4 Policy 27 – City, town, local and Commercial Centres
NPF4 Policy 28 – Retail
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
Argyll and Bute Local Development Plan adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP Prop 3 – The Proposed Potential Development Areas
LDP 3 – Supporting the Protection, Conservation and Enhancement of our Environment
LDP 4 – Supporting the Sustainable Development of our Coastal Zone
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 7 – Supporting our Town Centres and Retailing
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing our Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance 
SG LDP ENV 1 – Development Impact of Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 14 –Landscape
SG LDP ENV 20 – Development Impact on Sites of Archaeological Importance
SG LDP BUS 2 – Business and Industry Proposals in the Countryside Development
Management Zones
SG LDP TOUR 1 – Tourist Facilities and Accommodation, including Static and Touring
Caravans
SG LDP RET 4 – Retails Development within Countryside Development Management
Zones
SG LDP REC/COM 1 – Sport, Recreation and Community Facilities
SG LDP PG 1 – Planning Gain
SG LDP BAD 1 – Bad Neighbour Development

Page 4

SG LDP Sustainable - Sustainable Siting and Design Principles
SG LDP SERV 1 – Private Sewerage Treatment Plants and Wastewater (i.e. drainage)
systems
SG LDP SERV 2 – Incorporation of Natural Features / Sustainable Systems (SUDS)
SG LDP SERV 3 – Drainage Impact Assessment (DIA)
SG LDP SERV 4 – Contaminated Land
SG LDP SERV 5 – Waste Related Development and Waste Management 
SG LDP SERV 5(b) – Provision of Waste Storage and Collection Facilities within New
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP Sust Check – Sustainability Checklist
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 2 - Development and Public Transport Accessibility
SG LDP TRAN 3 – Special Needs Access Provision
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 5 – Off-Site Highway Improvements
SG LDP TRAN 6 –Vehicle Parking Provision
SG LDP TRAN 7 –Safeguarding of Airports
SG LDP TRAN  - Piers and Harbours
SG LDP CST 1 – Coastal Development 
Emerging Local Development Plan (LDP2) 
The emerging Local Development Plan (LDP2) will replace the current Local Development
Plan 2015, once adopted. On 13th June 2023, the Scottish Government’s Planning and
Environmental Appeals Divisions issued their Report of Examination on the Council’s
LDP2. At the time of writing this Pre-application report, the LDP 2015 remains the adopted
Local Development Plan, however, the Examination Report of the Draft LDP2 is a material
consideration of significant weight and may be used as such until the conclusion of the
LDP2 adoption process. 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design: All Development
Policy 14 – Bad Neighbour Development
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic
Built Environment
Policy 18 – Enabling Development
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance
Policy 22 – Economic Development
Policy 23 – Tourist Development, Accommodation, Infrastructure and Facilities
Policy 26 – Informal Public Outdoor Recreation and Leisure Related Development
Policy 28 – Supporting Sustainable Aquatic and Coastal Development
Policy 32 – Active Travel
Policy 33 – Public Transport
Policy 34 – Electric Vehicle Charging
Policy 35 – Design of New and Existing, Public Roads and Private Access
Policy 36 – New Private Accesses

Page 5

Policy 37 – Development Utilising an Existing Private Access or Existing Road
Policy 38 – Construction Standards for Public Roads
Policy 39 – Construction Standards for Private Access
Policy 40 – Vehicle Parking Provision
Policy 41 – Off Site Highway Improvements
Policy 42 – Safeguarding Piers, Ports and Harbours
Policy 43 – Safeguarding of Aerodromes
Policy 46 – Retail Development – The Sequential Approach
Policy 48 – Developer Contributions
Policy 49 – Sport, Recreation and Community Facilities
Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Drainage Systems (Suds)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources
Policy 80 – Geodiversity
Policy 82 – Contaminated Land 
Other Relevant Policy Considerations: 
 ABC Technical Note – Biodiversity (Feb 2017) 
 Marine Planning Policy
As part of the proposed development extends into the marine environment, the Council as
a public body is required to take authorisation decisions in accordance with the National
Marine Plan (NMP), unless relevant considerations indicate otherwise. 
The proposal must be consistent with General Policies of the NMP which include: 
 GEN 1 General planning principle, 
 GEN 2 Economic benefit, 
 GEN 3 Social benefit, 
 GEN 4 Co-existence, 
 GEN 5 Climate change 
 GEN 6 Historic environment 
 GEN 7 Landscape/seascape, 
 GEN 8 Coastal process and flooding, 
 GEN 9 Natural heritage, 
 GEN 10 Invasive non-native species, 
 GEN 11 Marine litter, 
 GEN 12 Water quality and resource, 
 GEN 13 Noise, 
 GEN 14 Air quality, 
 GEN 21 Cumulative impacts. 
The proposal must also be consistent with Marine Planning Policies of the NMP that
include:

Page 6

TRANSPORT 1, 3, 4, 5, 6, and 7. 
Local Development Plan Allocation 
The site is identified as a Potential Development Area [PDA] in both the adopted Local
Development Plan [LDP] and the emerging Local Development Plan [LDP2]. PDAs are
areas where development opportunities may be supported through the life of the plan,
subject to those constraints identified in the schedules of the PDA’s being successfully
addressed. Mini development briefs have been prepared for each PDA and are included
in the Action Programme that accompanies each LDP. The briefs identify the use or range
of uses considered appropriate, the constraints that needs to be resolved and those
policies which require to be taken into account. Within both Local Development Plans, the
site is allocated as a Potential Development Area [PDA] for a Marina/ Leisure/ Tourism
use (LDP ref. 5/54 and LDP2 ref. P4018). 
5.0 POTENTIAL MATERIAL CONSIDERATIONS 
In respect of this proposal, it is considered that the following matters will be material
considerations in the determination of any future planning application: 
a) Development Plan;
b) National Policy;
c) Flood Risk, Water Quality and Drainage;
d) Road Network, Parking and Transport Matters;
e) Peats and Soils;
f) Access and Recreation;
g) Natural Heritage and Biodiversity (including impact on designated sites and Marine
Designations);
h) Impact on Woodland;
i) Cultural Heritage;
j) Design and Layout;
k) Landscape and Visual Impact;
l) Contaminated Land;
m) Noise and Light Pollution;
n) Construction Impacts;
o) Phasing;
p) Open Space and Landscaping;
q) Infrastructure Capacity and Delivery;
r) Access, Navigation and Interaction with other Activities; and
s) Any other material considerations raised within representations. 
6.0 CONCLUSION 
The report sets out the information submitted to date as part of the PAN. Summarised are
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date. The list is not exhaustive and further matters may arise as and when a
planning application is received and in the light of public representations and consultation
responses.

Page 7

7.0  RECOMMENDATION 
That Members note the content of the report and submissions and provide such feedback
as they consider appropriate in respect of this PAN to allow these matters to be considered
by the applicants in finalising any future planning application submission. 
Author of Report: Stephanie Wade    Date: 04.08.2023 
Reviewing Officer: Peter Bain     Date: 08.08.2023 
Fergus Murray
Head of Development and Economic Growth