Democracy Spraffa

Minute

North Lanarkshire Council · 24 August 2022
Back to Environment and Place Committee — 24 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ENVIRONMENT  AND  PLACE  -  24  AUGUST  2022 
89
24 August 2022 at 2 pm. 
A Hybrid Meeting of the ENVIRONMENT  AND  PLACE  COMMITTEE 
PRESENT 
Councillor Masterton, Convener; Councillor Goldie, Vice-Convener; Councillors Cairns, Carragher, Crichton,
Di Mascio, Jarvie, Leckie, Lennon, Linden, Loughran, McBride, M. McCulloch, McDade, McKay, McPhilemy,
Nolan, Patton, Reddin, Roarty, A. Stubbs, Wilson and Woods. 
ALSO  PRESENT 
In accordance with Standing Order 64(a) Councillors Hughes and Smith attended as substitutes for Councillors
Mitchell and Thomas respectively. 
CHAIR 
Councillor Masterton (Convener) presided. 
IN  ATTENDANCE 
The Head of Environmental Assets; Head of Asset and Procurement Solutions; Head of Regulatory Services
and Waste Solutions, and Democratic Services Manager. 
APOLOGIES 
Councillors Mitchell and Thomas. 
Prior to consideration of business, the Convener indicated that he would be taking agenda item 4 –
Developing North Lanarkshire's Journey to Net-Zero Greenhouse Emissions – as the first item of
business. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. There were none. 
DEVELOPING  NORTH  LANARKSHIRE'S  JOURNEY  TO  NET-ZERO  GREENHOUSE  EMISSIONS 
2. There was submitted a report by the Head of Asset and Procurement Solutions (1) reminding the
Committee that achieving net-zero greenhouse gas emissions is a significant task and challenge for
the Council which has set its own ambitious timescale for achieving this ahead of the nationally set
2045 date; (2) examining the Council's net-zero progress and journey to date and some of the actions
that it is required to achieve and/or facilitate through national policy development and regulation over
the next few years, and (3) indicating that the absence of a defined North Lanarkshire pathway to
net-zero indicates that there is a gap in the Council's knowledge and expertise and that, therefore,
external assistance is required. 
Decided: 
(1) that the continuous improvement in climate change governance within the Council be
acknowledged;

Page 2

ENVIRONMENT  AND  PLACE  -  24  AUGUST  2022 
90
(2) that it be acknowledged that other Scottish local authorities face similar challenges to the
Council in reaching net-zero by 2030; 
(3) that the efforts of Services in terms of their current commitment to net-zero be recognised; 
(4) that it be acknowledged that there are key points in the Council's journey to net-zero
pre-determined via legislation and regulation (current and impending); 
(5) that, whilst acknowledging the excellent progress made to date within existing resources, it
also be recognised that there is a need for external assistance to facilitate the next steps of
the Council's Climate Change Delivery Programme, and 
(6) that further updates on progress be provided. 
BUSINESS  REGULATION  SERVICE  PLAN  2022-2023 
3. There was submitted a report by the Head of Regulatory Services and Waste Solutions (1) confirming
that all local authority regulators for food and occupational health and safety must plan their
enforcement and advisory activities and, in accordance with independent auditor preference, present
that plan before a relevant Committee before its approval, and (2) attaching, as an Appendix to the
report, the Service Plan 2022-2023. 
Decided: that the Business Regulation Service Plan 2022-2023 be approved. 
UPDATE  PAPER  -  ACTIONS  TAKEN  RELEVANT  TO  RODENT  COMPLAINTS 
4. There was submitted a report by the Head of Regulatory Services and Waste Solutions (1) reminding
the Committee that, following a motion to the Council on 13 August 2020, it had been agreed to record
and analyse all reports of rat sightings made to the Council and to report the data to the relevant
Committee at regular intervals; (2) explaining that at its budget meeting of 2 March 2021 the Council
awarded an additional £150,000 to Protective Services to treat defined priority areas experiencing high
levels of rat infestation; (3) reporting that over the financial year 2022/23 it had been agreed that there
would be a continuation of a free rodent control service delivered by the Council's Protective Services
Division, and (4) providing an update on the steps that continue to be taken in respect of the action
plan which is being devised in order to direct resources to the areas of most significant concern. 
Decided: that the actions that have, and will continue to be, undertaken to address identified
problem areas be supported. 
CEMETERIES  MEMORIAL  MANAGEMENT  UPDATE 
5. There was submitted a report by the Head of Environmental Assets providing an update on memorial
management across the authority and outlining proposed improvements to cemetery and structure
management. 
During consideration of this matter, the Committee requested that a report be brought to a future
meeting providing an update regarding general cemetery maintenance. 
Decided: 
(1) that the progress in making safe known memorial risks be endorsed, and

Page 3

ENVIRONMENT  AND  PLACE  -  24  AUGUST  2022 
91
(2) that the commencement of a new inspection regime in 2023 to cover all memorials to an
agreed timescale, details of which would be brought to Committee in Cycle 1 2023, be
endorsed. 
P002.1(4)  TREE  ASSET  MANAGEMENT  AND  ASH  DIEBACK  DISEASE 
6. There was submitted a report by the Head of Environmental Assets (1) explaining that inspections
which had taken place over the previous 12 months have consolidated the Council's understanding of
the risks that are present in the Environmental Assets tree stock and the level of remediation work
required to reduce those risks to a tolerable level in line with agreed strategy; (2) highlighting that the
strategy covers only trees within Council ownership, which are managed and maintained by
Environmental Assets, and Council owned trees adjacent to highways and schools; (3) explaining the
known impacts of Ash Dieback Disease, which are fast becoming evident within North Lanarkshire as
inspections of tree assets continue; (4) seeking support for the establishment of an Ash Dieback Action
Plan to tackle the corporate risk in not remediating these trees appropriately, and (5) setting out the
developing plans around placement planting to mitigate against the change in the landscape and loss
of what could be a considerable quantity of trees over the course of the next five to ten years. 
Decided: 
(1) that the approach to tackling Ash Dieback Disease in North Lanarkshire by initially
commissioning a desk-based data investigation exercise to inform an Ash Dieback Action
Plan, as recommended in the Ash Dieback Toolkit Scotland, be approved; 
(2) that the significant ongoing resource required to effectively tackle the corporate risk associated
with this endemic disease be recognised and that consideration be given to further budget to
allow continued remediation in line with the Tree Risk Assessment Management Strategy, and 
(3) that the progress of the planting of the climate emergency wood at Strathclyde Country Park
in Spring 2022, and the continued work that will take place in Autumn 2022 at Calderbank and
Palacerigg Country Park, be endorsed. 
WINTER  SERVICE  POLICY  AND  PROCEDURES  2022/23 
7. There was submitted a report by the Head of Environmental Assets (1) presenting the Committee with
details of the proposed Winter Service Policy and Procedures for 2022/23;  (2) explaining that the
Council has an obligation under the Roads (Scotland) Act 1984 to take such acts as it considers
reasonable to prevent snow and ice endangering safe passage of pedestrians and vehicles over the
public roads; (3) indicating that this obligation is discharged by the Council’s Term Maintenance
Contract with its partner, Amey Public Services (APS), and (4) advising that, to ensure that these
obligations are met, the Council is required to annually review its processes and procedures and
approve an annual refresh of its policy. 
Councillor Loughran, seconded by Councillor McPhilemy, moved, as an Amendment:- 
“In reference to paragraph 2.13 
The number of salt bins provided across the network has continued to grow from 760 (2010 to 2793
including 24 within recycling centres). 
• the Council acknowledges this presents a significant challenge across the network to
effectively service, both in anticipation and during adverse weather conditions. 
In reference to paragraph 2.15

Page 4

ENVIRONMENT  AND  PLACE  -  24  AUGUST  2022 
92
• an analysis of salt bin provision should be carried out, to identify high priority salt bins within
the Service; 
• the Council recommends a Working Group be tasked to evaluate and maximise both Service
and community resilience, in anticipation and during adverse weather conditions; 
• all conclusions of the Working Group be returned to a later cycle of Environment and Place
Committee for consideration.” 
Thereon, the Convener indicated that he was content that the Amendment be incorporated into the
terms of the report. 
Decided: 
(1) that the contents of the report and accompanying Appendix be noted; 
(2) that the proposed Winter Service Policy and Procedures 2022/23, as the base for Winter
Service Delivery in the coming year, be agreed; 
(3) that the pilot scheme that will look at route-based forecasting, which would inform future policy
decisions, be approved; 
(4) that the intervention level be amended in line with adjacent local authorities and implemented
as part of the Enterprise Contract which will commence in June 2024; 
(5) that it be acknowledged that the growth in the number of salt bins being provided across the
network presents a significant challenge to effectively service, both in anticipation and during,
adverse weather conditions; 
(6) that an analysis of salt bin provision be carried out to identify high priority salt bins by the
Service; 
(7) that a Working Group be tasked to evaluate and maximise both service and community
resilience, in anticipation of, and during, adverse weather conditions, and 
(8) that all conclusions of the Working Group be reported to a future Committee for consideration. 
DUMBRECK  MARSH  AND  GARREL  BURN  RIVER  RESTORATION 
8. There was submitted a report by the Head of Environmental Assets (1) providing a summary of the
successful river restoration project completed on the Garrel Burn at Dumbreck Marsh, Kilsyth; (2)
explaining that the project aimed to improve habitats across the site and to also provide improved
public access and flood resilience and was delivered in partnership with the Scottish Environmental
Protection Agency;  (3) reporting that the project had been completed successfully in April 2022 with
contract costs being significantly higher than anticipated due to environmental complexity and design
constraints, however, the additional spend was largely met by additional external funding from Water
Environment Scotland and the Scottish Government. 
Decided: 
(1) that the successful delivery of this major project, bringing significant environmental benefits to
North Lanarkshire, be recognised; 
(2) that the partnership working with the Scottish Environmental Protection Agency, bringing
additional benefits to the Council, be recognised, and

Page 5

ENVIRONMENT  AND  PLACE  -  24  AUGUST  2022 
93
(3) that the additional costs incurred in the contract due to the complex nature of the project be
acknowledged. 
CONTRACT  AWARD  FOR  THE  PROVISION  OF  WASTE  MANAGEMENT  AND  RECYCLING 
SERVICES  FOR  BULKY  WASTE 
9. There was submitted a report by the Head of Regulatory Services and Waste Solutions seeking
approval of the award of a contract for the provision of Waste Management and Recycling Services
for bulky waste to Dow Group Limited. 
Decided: that the award of the contract to Dow Group Limited at the maximum value of
£6,100,918, exclusive of VAT, be approved. 
CONTRACT  AWARD  FOR  THE  TREATMENT  AND  DISPOSAL  OF  KERBSIDE  COLLECTED 
CO-MINGLED  FOOD  AND  GARDEN  WASTE 
10. There was submitted a report by the Head of Regulatory Services and Waste Solutions seeking
approval of the award of a contract for the provision of Treatment and Disposal of kerbside collected
co-mingled food and garden waste to Levenseat Limited. 
Decided: that the award of the contract to Levenseat Limited at the maximum value of
£8,550,000, exclusive of VAT, be approved. 
CONTRACT  AWARD  FOR  SUPPLY  AND  FIT  FOR  VEHICLES  AND  PLANT 
11. There was submitted a report by the Head of Regulatory Services and Waste Solutions seeking
approval of the award of a contract for the supply and fit of tyres for vehicles and plant including
associated services to McConechys Tyre Service Limited. 
Decided: that the award of the contract to McConechys Tyre Service Limited at the maximum
value of £960,000, exclusive of VAT, be approved. 
CONTRACT  AWARD  FOR  THE  PROVISION  OF  LANDFILL  CONSULTANCY  SERVICES 
12. There was submitted a report by the Head of Regulatory Services and Waste Solutions seeking
approval for the award of a contract for the provision of Landfill Consultancy Services to RPS
Consulting Services Limited. 
Decided: that the award of the contract to RPS Consulting Services Limited at the maximum
value of £900,000 be approved. 
CONTRACT  AWARD  FOR  TREATMENT  AND  DISPOSAL  OF  RESIDUAL  WASTE  FROM 
HOUSEHOLD  WASTE  RECYCLING  CENTRES 
13. There was submitted a report by the Head of Regulatory Services and Waste Solutions advising the
Committee of the decision taken, in accordance with Condition 21.3.2 of the Council’s General
Contract Standing Orders, for the award of a contract, split across two lots, for the treatment and
disposal of residual waste from household waste recycling centres, on 14 March 2022 to Patersons of
Greenoakhill Limited for a value not exceeding £18,000,000, exclusive of VAT.

Page 6

ENVIRONMENT  AND  PLACE  -  24  AUGUST  2022 
94 
Decided: that the award of the contract in accordance with General Contract Standing Orders 
to Patersons of Greenoakhill Limited for both Lot 1 and 2 at the maximum value of
£18,000,000, exclusive of VAT, be acknowledged. 
CONTRACT  AWARD  FOR  THE  DESIGN  AND  BUILD  OF  NEW  BELLSHILL  WASTE  AND  FLEET 
DEPOT 
14. There was submitted a report by the Head of Regulatory Services and Waste Solutions advising the
Committee of the decision taken in accordance with Condition 21.3.2 of the Council’s General Contract
Standing Orders for the award of the contract for the design and build of a new Bellshill waste and
fleet depot to Tilbury Douglas Construction Limited for a value of £5,320,440.50, exclusive of VAT.   
Decided: that the award of the contract to Tilbury Douglas Construction Limited at the value of
£5,320,440.50, exclusive of VAT, be acknowledged. 
CONTRACT  AWARD  FOR  THE  PROVISION  OF  LICENCE,  SUPPORT  AND  MAINTENANCE  FOR 
CIVICA  IT  SOLUTION  2022  -  23 
15. There was submitted a report by the Head of Regulatory Services and Waste Solutions advising the
Committee of the decision taken in accordance with Condition 21.3.2 of the Council’s General Contract
Standing Orders for the award of a contract for the provision of licence, support and maintenance for
Civica IT Solution 2022-23 to Civica UK Limited for a maximum value of £107,996.84, exclusive of
VAT. 
Decided: that the award of the contract to Civica UK Limited, at the maximum value of
£107,996.84, exclusive of VAT, be acknowledged. 
CONTRACTS  AWARDED  BELOW  COMMITTEE  APPROVAL  THRESHOLD 
16. There was submitted a report by the Head of Asset and Procurement Solutions notifying the
Committee of the contracts awarded between 1 January to 30 June 2022 with a value below the
financial threshold requiring committee approval. 
Decided: that the contracts awarded below committee approval threshold between 1 January
to 30 June 2022, as per the process within the Council’s General Contract Standing
Orders, be noted. 
VALEDICTORY 
17. The Convener indicated that this would be N. Paterson’s last meeting of the Committee as she was
leaving the Council, and proceeded to, on behalf of the Committee, thank her for her support and hard
work.