Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
22 August 2023 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND
BY MICROSOFT TEAMS on TUESDAY, 29 AUGUST 2023 at 10:30 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MOWI SCOTLAND LTD: FORMATION OF FISH FARM (ATLANTIC SALMON)
INCORPORATING TWELVE 120M CIRCUMFERENCE CIRCULAR CAGES AND
SITING OF FEED BARGE: NORTH KILBRANNAN FISH FARM, NORTH OF COUR
BAY, KILBRANNAN SOUND, EAST KINTYRE (REF: 20/01345/MFF) (Pages 3 - 98)  
Report by Head of Development and Economic Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   20/01345/MFF
Planning Hierarchy:  Local Application
Applicant:   MOWI Scotland Ltd.
Proposal: Formation of fish farm (Atlantic Salmon) incorporating twelve
120m circumference circular cages and siting of feed barge 
Site Address: North Kilbrannan Fish Farm, North of Cour Bay, Kilbrannan
Sound, East Kintyre
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 2
1.0 INTRODUCTION 
The purpose of this report is to make Members aware of an additional letter received from
the applicant dated 23/5/23 in response to late representations.
2.0 DETAIL
The letter dated 23/5/23 advises that Mowi would like to take the opportunity to respond to the
three last minute objections to the North Kilbrannan Fish Farm, which have been submitted
within two days prior to the Planning Committee meeting scheduled for 24/05/2023. They are
surprised and disappointed by the nature of the last minute attempts to lobby the council
planners and councillors with these objections which they consider are largely based on
personal opinion, lack scientific evidence, and are indeed false. Additionally, they do not find
the threatening undertones acceptable.
They contend that an example of the false statements made in these objections include the
suggestion that a Google Maps Satellite image can display “large quantities of visible pollution
flowing out of that [Carradale] site”. Having looked at the current Google Maps Satellite, which
will not be updated to real-time, it is clear that this image displays natural water movement
and eddying as a result of vessel movement and current displacement from the infrastructure.
Mowi rigorously adheres to strict licence conditions relating to discharge into the marine
environment and finds this potentially defamatory claim unacceptable.
With regards to comments made by Ms Burgess MSP on the cumulative impact of sea lice
from the proposed North Kilbrannan Fish Farm with the existing farms in Loch Fyne and the
Firth of Clyde, MOWI agree and recognise that this is an important assessment to make. They
have already taken this into account and submitted cumulative modelling of existing sites
within the Firth of Clyde and the proposed North Kilbrannan Fish Farm (dated 12 April 2021).
As detailed in this cumulative assessment of all active fish farms in the Clyde area, modelling
results show that levels of sea lice occur at low densities (less than 0.1 lice m-2) throughout
most of the Firth of Clyde and Kilbrannan Sound. Technical details of this modelling can be
Page 3 Agenda Item 3

Page 4

reviewed on Argyll and Bute’s planning portal and MOWI would be happy to answer any further
questions on our cumulative sea lice modelling if needed.
Additional comments made by Ms Burgess MSP refer to Sea Lice modelling carried out by
SEPA. MOWI note that the comments do not quote a source document, and the applicant is
not aware of finalised results or a published report by SEPA. They believe that this calls into
question the source, accuracy, and reasonableness of the information stated as fact. They
note that SEPA has engaged with the industry as part of the consultation process developing
the Sea Lice Risk Framework and that SEPA’s modelling is a screening tool and as a result is
conservative. MOWI do not consider that it is appropriate to base the North Kilbrannan
decision on a screening tool, particularly one which is not finalised, published, or accepted in
regulation. Once a protocol is developed, finalised detailed modelling would be required in
addition to the screening tool, which would take into account factors such as lice behaviour
and would present more realistic results. Preliminary work by the industry and independent
parties replicating SEPA’s tool and comparisons with more realistic modelling outputs have
shown lower lice burdens that the screening results. Considering the comments made by Ms
Burgess, MOWI find it inappropriate for an MSP to intervene at such a late stage with
comments that have previously been discussed. MOWI suggest a recourse to the
parliamentary standards committee might be appropriate.
The applicant advises that a significant amount of work has been carried out to assess the
suitability of the North Kilbrannan Fish Farm by both Mowi and the statutory consultees. They
suspect that these objectors have not reviewed or chosen to ignore the scientific-led
assessments before repeating opinions which are beyond scientific-based facts. MOWI find
this late stage intervention an attempt to lobby against the application very concerning.
3.0 ASSESSMENT
This letter from the applicant does not raise any new material planning considerations over
and above those set out, and fully assessed within the main report and supplementary report
no.1.  
4.0 RECOMMENDATION 
It is recommended that planning permission be approved subject to a pre-determination
hearing and the revised conditions listed in Appendix 1 supplementary report no. 1. 
Author of Report: Sandra Davies      Date: 22/5/23
Reviewing Officer: Peter Bain  Date: 23/5/23 
Fergus Murray 
Head of Development and Economic Growth
Page 4

Page 5

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   20/01345/MFF
Planning Hierarchy:  Local Application
Applicant:   MOWI Scotland Ltd.
Proposal: Formation of fish farm (Atlantic Salmon) incorporating twelve
120m circumference circular cages and siting of feed barge 
Site Address: North Kilbrannan Fish Farm, North of Cour Bay, Kilbrannan
Sound, East Kintyre
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to make Members aware of additional representations that have
been received since the Report of Handing was published for the May PPSL committee
agenda and to highlight further submissions that have been received from the applicant and
NatureScot.
2.0 REPRESENTATIONS
Richard Prickett, Managing Director of Dorset Cleanerfish Limited was previously a
supporter of the application and has asked for his name to be removed from the application.
Members are advised that additional objections have been received subsequent to the
publication of the Agenda. 
The additional objections are set out below; -
 Ariane Burgess MSP, Highlands and Islands, Scottish Green Party
 Friends of the Sound of Jura c/o John Aitchison by email - objection;
 Jessica Gill, The Old Manse, Skipness, Tarbert PA29 6XT– objection.
 Harry Nickerson, Director, Cour Ltd by email – objection 
 WildFish Scotland c/o Rachel Mulrenan, Director by email – objection 
NB Full transcripts of all representations can be viewed on the Council’s website www.argyll-
bute.gov.uk
A summary of the issues raised is as follows:
Sea Lice and Concerns with Environmental Management Plan (EMP) Approach and Impacts
on Special Area of Conservation (SAC)
Page 5

Page 6

Argyll and Bute Council should confirm that it is aware that SEPA is proposing to use
essentially the same threshold for harm to wild salmon post-smolts by fish farm-derived sea
lice as the Norwegian state does.
This is significant for the advice that you give the planning committee because MOWI’s
proposed EMP for Kilbrannan Sound includes the company’s modelling of sea lice densities
in the Firth of Clyde.
The EMP’s analysis of this modelling concluded that the densities rarely exceed a threshold
level of harm for wild fish, which it defined as an exposure to 2 copepodid sea lice per
square metre of water surface for 24 hours.
The modelling commissioned by Friends of the Sound of Jura that we have sent you
previously also referred to a threshold of 2 cop lice/m2/24 hours exposure.
In fact this is the Norwegian State’s threshold between a medium and high level of harm.
The lice densities in the sea for that threshold are approximately three times higher than the
threshold exposure level for harm that SEPA has since proposed to use, which is essentially
the same as the Norwegian state’s boundary between low and medium harm, not medium
and high.
This lower threshold is based on the best available science, which has been rigorously
reviewed by the state regulators in Norway.
The Norwegian state uses 0.7 cop/m2/24 hours, an exposure that would result in 10%-30%
of 20g salmon post smolts having enough sea lice on them to kill them. The salmon
population those fish belong to would then face a medium risk of shrinking as a result of
these extra deaths.
SEPA proposes to use the very similar figure of 0.75, based on the same Norwegian
science, and confirmed by a separate analysis by Marine Scotland scientists.
SEPA’s threshold is intended to keep the risk of increased mortality for individual fish below
10%, in order for the risk of the population shrinking to be low (although not zero).
This means that the conclusions in MOWI’s proposed EMP are invalid.
You should reassess the company’s modelling results and ours, in the light of the much
tighter 0.75 copepod lice/m2/24 hours exposure threshold.
Our modelling shows that in alternate years, when all but one farm in the Greater Clyde are
in their second year of production, there is already a significant risk of exceeding the
threshold of harm caused by sea lice from the existing farms, when assessed against 0.75
cop/m2/24hours.
Adding a large new farm will increase this risk.
SEPA’s preliminary modelling of lice from the area’s existing farms shows the same thing -
that in alternate years, a significant percentage of young salmon, migrating along different
routes through the Firth of Clyde, would be exposed to unacceptably harmful levels of lice
(>0.75 cop/m2/24 hours).
Argyll and Bute Council’s LDP Policy AQUA 1 obliges it to consider the cumulative impacts
of this proposed development and that of the existing farms. As you know, cumulative impact
is defined in SPP 2014 as impact in combination with other development. This includes
Page 6

Page 7

existing development of the kind proposed, those which have permission and valid
applications which have not been determined.
Your statutory advisors Marine Scotland and NatureScot seem to have advised you that this
cumulative risk can be managed through an EMP that would only be able to affect the lice
numbers on three of the 18 farms that would be operating if North Kilbrannan is consented.
Please ask them to tell you how such an EMP will manage the cumulative risk from the other
farms.
Your predecessor Richard Kerr wrote about EMPs to the ECCLR Committee in 2018
(Supplementary written submission from Argyll and Bute to supplementary questions
following ECCLR meeting of 6 February 2018). His comments are still valid.
"By the time we get to the point where an Environmental Management Plan has been
required by condition, the extent to which that is able to address cumulative issues is likely to
be influenced by whether farms in the same water body are in the control of the applicant, or
whether there are multiple operators. It is clearly appropriate to ask an operator of a suite of
farms to address their response to a condition in the light of those farms which they operate
which could reasonably be expected to present cumulative issues, but it is less practical to
ask them to address issues arising from farms in the control of others, where their access to
information will not be the same. 
As a general point about EMP’s, whilst they provide some reassurance that wild fish
interests are being addressed in the context of a particular application, they are not an
appropriate means to provide an area wide response to the overall impact of sea lice. As it is
there are many pre-existing sites operating without EMP’s, and without any prospect of such
unless an application should be made to alter a farm in the future. EMP’s are resorted to by
Planning Authorities given the lack of an overall area based approach to wild fish interests
founded around cumulative impacts. They are only capable of providing a somewhat random
and ad hoc response to an issue which is ongoing, regardless of the incidence of planning
applications. Accordingly, we have situations where a loch with no applications holding many
thousands of tonnes of biomass may not be subject to any ongoing consideration of wild fish
interactions, whereas another loch with an application for an extension of a few hundred
tonnes may prompt the requirement for an EMP and the potential need to address
cumulation with other sites. They are in effect a sticking plaster, not a systematic means of
assuring well-being in the wider environment.
Please note that the Planning Authorities responsible for aquaculture are agreed that EMP
conditions afford the only means open to them to monitor the effectiveness of an operator’s
response to the incidence of sea lice arising from the operation of a particular site, and
present the only opportunity to require monitoring data or to introduce sanctions in the event
that lice numbers after mitigation become significantly more prevalent than envisaged at the
application stage. That does not, however, mean that EMP’s are the best means of
monitoring the impact of sea lice from multiple sources upon a given water body. That would
be best addressed routinely on an area wide basis (by Marine Scotland with input from SNH
and the DSFB’s?) taking into account all existing development, and operating experience
gained from that development, without having to wait for a random catalyst presented by a
planning application. The haphazard response to date via a small number of EMP’s would
suggest that responsibility for wild fish interactions has been inappropriately allocated to
Planning Authorities, who given their reactive role, are not in my opinion the best placed
regulator to address this issue on a comprehensive basis, taking into account cumulative
effects.”
Page 7

Page 8

WildFish Scotland challenge the assertions made in an email from NatureScot to the
Planning Authority which concludes “we are satisfied the LPA can conclude that appropriate
measures are in place to ensure that the farm will not compromise the conservation
objectives of the Endrick Water SAC and will not therefore result in an adverse effect on site
integrity.”  We are adamant that this assurance is flawed for the following reasons (inter alia):  
1) Neither NatureScot’s latest advice, nor the EMP, take any account of the cumulative
impact of a large additional farm in this section of the Firth of Clyde and associated sea
lochs, when it is combined with all the existing farms. The North Kilbrannan site is close to
the mouth of Loch Fyne where there are up to ten active salmon farms at any one time
operated by another company (Bakkafrost), which is not a party to the EMP. North
Kilbrannan, if approved, would likely add to lice loads being produced in and washed out of
Loch Fyne as well as lice emanating from all the other farms, such as Ardyne, in the Firth of
Clyde area. In the event that monitoring shows elevated lice levels on wild salmonids, then
Mowi may well dispute that its North Kilbrannan (and Carradale) farms are responsible and
thus refuse to take remedial action; in such circumstances there is no mechanism for
compelling the company to do so. Given the impossibility of determining the source of the
lice causing elevated counts on the wild salmonids, the EMP will be ineffective. To rely on
SEPA’s anticipated and untested sea lice framework at some unknown future date is
contrary to the precautionary principle which the “competent authority” is obliged to pay heed
to. 
Whilst SEPA’s modelling method does enable them to see the percentage of lice contributed
per farm in any sea area (inside its WSPZs) and in principle it would be possible to calculate
the proportion of a fish’s exposure during its journey through the area that was due to each
farm.  However, SEPA does not seem to be proposing this. 
SEPA is deliberately limiting its modelling to only do risk assessment (e.g., by not adding
sea lice biological behaviour to its model), and intends then to ask applicants to do their own,
more detailed modelling. This opens up a gap between SEPA’s approach to consenting new
farms (assessing lice from all farms but in an incomplete way, with the applicants doing the
detail, with implications for potential bias) and the need to do centralised detailed modelling
of areas with multiple farms, regardless of whether new farms are proposed, in order to
protect wild fish. This is especially necessary where there are SACs, due to NatureScot’s
legal obligations. NatureScot has advised colleagues that they have asked SEPA to assess
areas that have salmon SACs first, but that does not mitigate the issue that SEPA does not
plan to improve its modelling, so any risk-screening it does of SAC areas will still have no
detailed modelling, unless the industry volunteers to do it. What is there to stop the industry
doing detailed modelling to rebut SEPA’s less good work in SAC areas?
The written submission from Argyll and Bute to supplementary questions following the
Environment, Climate Change and Land Reform Committee meeting (part of the
Parliamentary Inquiry into salmon farming) of 6 February 2018 noted: “It is clearly
appropriate to ask an operator of a suite of farms to address their response to a condition in
the light of those farms which they operate which could reasonably be expected to present
cumulative issues, but it is less practical to ask them to address issues arising from farms in
the control of others”.
In 2020 NatureScot (then SNH) advised Argyll and Bute Council to take note of their advice
in relation to a scoping opinion for further proposed fish farms in the Clyde region (reference
19/00233/SCRSCO): “…..there are a number of existing fish farms in the Firth of Clyde area
Page 8

Page 9

which have the potential to result in cumulative impacts. The assessment will need to
consider the potential cumulative risk from multiple new and existing developments to the
SAC and therefore information on any coordinated activity/management should be included.
It will be particularly important that any mitigation that is proposed in any subsequent
planning application/EIA takes potential cumulative impacts into account and is robust and
sufficient to protect the SAC from any adverse effect”.  
2) The proposed EMP (and SEPA’s modelling) relies on Mowi performing and recording
regular weekly sea lice counts. Salmon farms (including those operated by Mowi) routinely
fail to carry out weekly sea lice counts (often for weeks, even months, at a time) for a variety
of reasons including “weather”, “veterinary advice” (during disease and/or lice treatments),
“harvesting” or “withdrawal period” before harvesting. Analysis of sea lice reported data
shows that in 2022, Mowi Scotland failed to submit a sea lice count for 16.8% of its weekly
submissions. On some farms, "no count" accounted for over a third (An Camas - 34.6%) of
all weekly counts given in 2022. There is no mechanism for forcing companies to carry out
lice counts. The absence of lice counts will render the EMP inoperative.
Argyll and Bute and NatureScot may argue that the EMP does not solely depend on sea lice
counts on farms as it also depends on feeding back sea lice counts on wild sea trout and
‘monitoring’ the Endrick Water SAC’s and other salmon populations in freshwater. It is
extremely hard to catch enough sea trout to get statistically valid sea lice counts – hence no
EMPs in Scotland have thus far affected farm management – and there is no mechanism in
the EMP to allow monitoring of the SAC’s salmon population to feed back into farm
management. 
Critically the Endrick Water SAC’s population is already falling. NatureScot has no way of
knowing what proportion of that fall is due to each of the existing farms, so how much of any
future fall will be due to North Kilbrannan? As emphasised above, the companies will
challenge any conclusions drawn about this, during the end of cycle review. 
Only modelling can allocate the degree of blame and the need to take action to each farm,
but SEPA is planning to use modelling methods that the industry could refute, because they
do not include sea lice behaviour. In addition, any assessment against SEPA’s threshold of
harm relies on the sea lice dispersion modelling being able to accurately predict the actual
lice density in the sea. 
None of the Scottish models have been validated, including SEPA’s, so the absolute lice
figures they predict can also be challenged by industry. NatureScot seems to have no
expertise and little knowledge of how sea lice modelling works or its limitations.  
3) NatureScot envisages the North Kilbrannan farm’s management of sea lice being subject
in due course to the “the detailed modelling and risk assessment process required under
SEPA’s framework”. As noted above, SEPA has said specifically that it will not do detailed
modelling, only enough for risk screening.
Additionally, when SEPA’s sea lice framework (the details of which are still being consulted
on) comes into force (perhaps in 2024 at the earliest) it will initially only be for new farms or
farm expansions. The framework will only incorporate existing farms at some undetermined
future date. If granted planning permission, North Kilbrannan will then by 2024 be an existing
farm and accordingly not (until some undetermined future date) subject to the SEPA sea lice
Page 9

Page 10

framework regime. This will occur only when evidence of harm is presented to SEPA, which
really means supplying SEPA with more detailed modelling than its own, for the reasons
given above. The industry will not go out of its way to do this unless it is confident it can
show that there is no risk of harm.
4) Councils (including Argyll and Bute) readily concede that they do not have the resources
or the knowledge to enforce the terms of an EMP. The written submission from Argyll and
Bute to supplementary questions following the Environment, Climate Change and Land
Reform Committee meeting (part of the Parliamentary Inquiry into salmon farming) of 6
February 2018 acknowledged that EMPs are “somewhat random and ad hoc response to an
issue which is ongoing” and “are in effect a sticking plaster, not a systematic means of
assuring well-being in the wider environment”.
The EMP provides no reassurance, let alone certainty, that the integrity of the Endrick Water
SAC will not be compromised by the proposed North Kilbrannan farm. NatureScot’s position
is untenable because it is endorsing a regime under which only three farms are party to the
EMP and there is no mechanism whatsoever for feedback from the monitoring of impacts on
the SAC to farm management.
Given the uncertainties and the clear risk to wild fish, especially in the SAC with its high
threshold of ‘beyond reasonable doubt’, NatureScot and Argyll and Bute should be applying
the precautionary principle, rather than hoping to fix matters through limited adaptive
management. Consequently, NatureScot’s advice does not stand up to scrutiny and
accordingly it would be wrong for Argyll and Bute, as the competent authority, to rely on this
advice. In the circumstances we maintain that it would be illegal for Argyll and Bute to
approve the North Kilbrannan planning application.
SEPA has trialled that risk-assessment modelling by modelling post-smolts (young salmon)
that swim through Loch Fyne and the Firth of Clyde – including the area where Mowi’s new
fishfarm is proposed at North Kilbrannan - to reach the sea. Salmon migrating out of the
Endrick Water Special Area of Conservation – salmon that are supposed to be protected –
also swim through that area in the Firth of Clyde.
SEPA’s modelling did not include sea lice from the proposed North Kilbrannan farm. But it
found that, from the existing 17 salmon farms in the Greater Clyde area - between 10 and
30% of migrating salmon would be at risk of death due to sea lice, and 15% of the smolt’s
journeys would expose the young salmon to levels of harm above SEPA’s accepted
threshold.
The Endrick Water salmon are already in decline. Allowing more finfish farms will expose the
wild salmon to even more sea lice and even greater pressure on their populations.
Comment: This application is supported by an EMP which the Council has been advised by
its statutory consultees is fit for purpose.  It is accepted that in the future the sea lice issue
will be more appropriately regulated by SEPA, however, there is no moratorium on marine
fin fish applications until the SEPA system is in place, therefore, under the current system an
EMP is considered an acceptable way to manage this issue.  It should be noted that the
EMP contains a requirement for adaptive management and in this respect the applicant has
advised that they propose to revise the EMP and include a commitment that the outputs of
the modelling and risk assessment process generated under the proposed sea lice risk
framework will feed into and influence the first end of cycle review process.
Fish Farm Medications and Impacts on Human Health
Page 10

Page 11

You mention that ‘Expert opinions have been submitted critiquing the conclusions of the
SSPO (now Salmon Scotland) commissioned report on the impacts of fish farm medications
on human health. These are from Professor Malcom Hooper, Emeritus Professor of
Medicinal Chemistry and Mr Boetimann Isaack, Principal Advisor, Fish River Occupational
Hygiene.’ We consider it a critical omission that you have not made clear that both experts
went beyond a critique and unequivocally stated that the chemical emissions from the fish
farm present a risk to public health and safety. It is also a critical omission that you have not
mentioned the corroboration of the third expert, Professor Galloway, nor the fact that she
was an officially recognised expert member of the UK Government Hazardous Substances
Advisory Committee. Decision makers need to know that three totally independent,
unconnected and highly qualified experts have concluded that the salmon farm chemicals
present a risk to human health and no Government expert has provided any counter-
evidence. In spite of this, your recommendation relies on just one Industry sponsored report
and the meaningless response of NHS Highland who have declared that they are not
qualified to help you decide. The onus must be on the applicant and the Council to confirm
that this application will not endanger the public. The balance of evidence (three to one)
suggests that it will endanger the public, that no one has calculated how far the risk extends
and that there is no legal method of excluding the public from this zone, but your report does
not make Councillors aware of this.
You do not mention that there is physical effluent emitted by salmon farms, consisting of pink
slime, froth and greasy scum which we have proved will flow into and stagnate within Cour
Bay where people swim. We have submitted photographic evidence of this pollution and if
you were to look on the Google Map Satellite view of Carradale fish farm right now, you will
see evidence of large quantities of visible pollution flowing out of that site. This pollution
impacts on the amenity of others in contravention of your bad neighbour policies LDP 8 and
SG LDP BAD1 and we question why you are not briefing Councillors about it.
Comment:  The planning authority does not have expertise in human health and therefore
NHS Highland were consulted on this planning application.  Whilst NHS Highland did not
give definitive advice on the applicant’s supporting report or the reports submitted by a third
party, they did not object to the proposal. In order to further reduce risk associated with this
proposal, a planning condition is recommended which will require the applicant to advise
interested parties when they are conducting bath treatments on the farm.
Site History
You state that ‘There have been not previous planning application at this site for a fin fish
farm at this location. A Crown Estate licence was consulted in 2006 but this was withdrawn.’
This statement is not true. It is true that prior to March 2007, fish farm planning applications
were handled by the Crown Estate rather than the Council, but multiple applications were
made from 1989 onwards and are a matter of public record. By denying their existence,
Councillors are being mis-led, because relevant authorities have already considered and
rejected this site for sound reasons. The previous applications include: 
a. 17 February 1989 - Crown Estate Notification of Application for Proposed Marine
Fish Farms Sites – 707a Cour, East Kintyre NR831484 – Salmon and Cod.
b. 12 June 1989 - Crown Estate  Ref  XX100/719a Which approved a shell fish farm at
Eascairt while rejecting other sites that initially included one at Cour. Also
XX100/720a and XX 100/778a.
Page 11

Page 12

c. 1 September 2004 - 04/01749/MFF Application to Argyll and Bute Council Fish
Farms At Rubha Riabhach. (Rubha Riabhach is at Cour). This was from Lakeland
Marine who wanted to farm Cod and this company was absorbed into Marine Harvest
(now MOWI).
d. 27 April 2006 - Crown Estate Ref XX100/118b by Lakeland Marine for Salmon Farms
at NR839495 and NR858535 (which are beside Cour).
e. 25 April 2006 – 06/00873/MFF Application to Argyll and Bute Council for Marine Fish
Farm at Rubha Riabhach. The Council Planning Portal shows that this application
was only formally closed in 2012. 
The Eilean Grianain (Carradale) site was consented in 2009 when Council officials
reassured us that no further applications would be permitted further up the Kintyre Coast and
there was recognition that sites such as Rubha Riabhach were not suitable.  The current
application for North Kilbrannan (Rubha Riabhach) commenced with SEPA in 2018. The fact
that no approval has been granted previously at Cour or Rubha Riabhach after so many
years of consideration between 1989 and now is highly significant, but your report ignores
this.
Comment:  Marine Fish Farms have only required planning permission since 2009, however,
previously planning authorities would have been consultee in the process.  The site history
listed on the Report of Handling is that which is available on the Council’s electronic planning
application software. When a planning application is submitted to the Council it is assessed
on its merits against the policies of the Development Plan.
Impacts on Listed Building
You state at page 50 that the fish farm is ‘outwith sightlines of adjacent Crossaig and Cour.’
This is factually incorrect, which can be proved by a site visit, and the entire fish farm will be
visible from Cour House. A similarly incorrect statement about  the headland of Rubha
Riabhach screening the site from Cour House fails to take account of the elevation of Cour
House which means that you can see over the top of the headland, leaving the whole fish
farm in full view.
Comment: Officers’ view on the impact of this proposal on the setting on the category A
listed building has been formed through the consideration of the SLVIA submitted as part of
the EIAR and a consultation response for Historic Environment Scotland who have not
objected to this proposal.
General Concerns Regarding Fish Farms
When you read that MOWI were nominated for the Scottish Polluter of the Year award in
2019, it is very concerning an irresponsible to give them permission to open another farm. 
Salmon that industrially farmed in open net cages are crammed at incredible densities,
which not only causes the fish a great deal of stress but also abets the spread of deadly sea
and polluting local waters.  Mortality rates on farms can be as high a 57%, high levels of sea
lice infestations spread to wild populations, and pollutants used to control the infestations
devastate the sea bed ecosystems.  Allegedly between April and December 2019, MOWI
Scotland applied 19.6 tonnes of formaldehyde used as a pesticide, into Scottish Lochs. 
Formaldehyde is classified as a human carcinogen and SEPA says that uncontrolled
releases “have potential to cause significant harm to the environment”.
Page 12

Page 13

You have not briefed Councillors on MOWI’s poor record of fish farm structural failures and
escapes. Allegedly, the new standard of fish farm design will withstand all storms, but
critically you have not told Councillors that the design standards are based on a storm of 70
mph winds occurring only once in every 50 years. This area encounters stronger winds than
that nearly every year, so the build standard is inadequate. Carradale fish farm
catastrophically collapsed in 2020 allowing fish to escape and North Kilbrannan is much
more exposed so the risk there is even higher, but Councillors are not being briefed about
the facts nor the consequential legal risk.
Comment: Pollution issues are a matter for SEPA.  With regard to the risk of escapes, the
applicant has provided attestations for the proposed equipment and have introduced new
more stringent procedures since the Carradale escape.  These are considered to be
acceptable. 
3.0 FURTHER COMMENT FROM NATURE SCOT
In response to late representations received in relation to cumulative impact and Endrick
Water SAC, NatureScot submitted a further response to the planning authority dated
23/5/23. NatureScot have stated that 
“We note that the issue of cumulative impacts has been raised. We agree that the
consideration of possible cumulative effects is important and we would highlight the need for
any regulator to do so as part of the determination process. I would also like to clarify that
NatureScot has further considered cumulative impacts based on new information that has
emerged since our original response to the application submitted in 2020. On the basis of
the information available to us at this time we conclude that the proposed site at North
Kilbrannan is unlikely to contribute significantly to cumulative risk for post-smolts migrating
from the Endrick Water SAC. We have reached this conclusion on the basis of sea lice
dispersal modelling and evidence relating to smolt migration routes in the Firth of Clyde. In
reaching this conclusion we have taken in to account recent smolt tracking studies that
indicate that the primary migration route for smolts from the Endrick Water SAC passes
through the outer Firth of Clyde to the east of Arran. The available sea lice modelling
suggests that this area is less likely to be subject to high density accumulations of sea lice.
On the basis of the available evidence we consider that the risk posed to smolts passing
through this area from the Endrick Water is low. 
From the information that is available to us it appears as though the Inner Clyde area (north
of the Cumbrae Isles) may be a key area in terms of managing cumulative risk for smolts
migrating south from the Endrick Water. A number of proposed new sites exist in this area
and should these sites be consented, they could pose a significant cumulative risk to smolts
migrating from the Endrick Water SAC. However, we acknowledge that these sites are not
currently subject to planning applications and are beyond the consideration of the current
application
Based on the above, we consider that North Kilbrannan fish farm will pose a limited risk to
the majority of smolts migrating south from the Endrick Water SAC and is unlikely to
contribute significantly to cumulative risk. However, we acknowledge that our understanding
of sea lice modelling and migration routes in the Firth of Clyde is likely to continue to
advance in the future. On this basis, we feel that it is important that the LPA maintain a
mechanism to consider any new information that arises, ensuring that they can use the best
available evidence as part of their ongoing consideration of potential risk to the Endrick
Water SAC.”
Page 13

Page 14

4.0 CORRESPONDENCE FROM THE APPLICANT
Request for In Person Hearing
In a letter dated 18th May 2023 has written to advise that In the event that a pre
determination hearing is confirmed they would request that the format of that meeting
includes the option for an in-person hearing local to the development site. They state that
while they recognise the advantages provided by virtual hearings and their case for having a
permanent role, they believe that full appropriate and balanced participation can be
challenging especially for complex applications. If holding the meeting virtually is preferred
they would ask that the ability to attend in person is available the applicant and other parties.
Comment on Report of Handling
The applicant has noted that in relation to the human health / wild swimming issue, in section
F the report states:
“Expert opinions have been submitted critiquing the conclusions of the SSPO (now Salmon
Scotland) commissioned report on the impacts of fish farm medications on human health.
These are from Professor Malcom Hooper, Emeritus Professor of Medicinal Chemistry and
Mr Boetimann Isaack, Principal Advisor, Fish River Occupational Hygiene.”
The applicant wishes to highlight that they submitted responses from the authors of the
report (wca) which places some doubt on the validity of the expert opinions expressed by the
above individuals. They wish Members to be made aware that wca have responded in detail
to each opinion highlighting some of the comments are not a balanced critique of the
assessment report and whilst raising valid scientific and technical issues there is a lack of
understanding demonstrated of the regulatory risk assessment process. Wca restate their
position that the report does fulfil the fundamental requirements for the risk assessment of
the three substances under their stated conditions of use, based on the criteria and
assumptions clearly stated in the report.
Comment on Further Consultee Reponses and Representations
NatureScot
The applicant agrees that the EMP framework should provide an iterative approach in
respect of use of available and developing evidence and considerations of risk to wild
salmonid populations, including the potential for adverse effects on the integrity of the
Endrick Water SAC.  As such the applicant proposes to revise the EMP and include a
commitment that the outputs of the modelling and risk assessment process generated under
the proposed sea lice risk framework will feed in to and influence the first end of cycle review
process.  The applicant would be content to submit a revised EMP, including such a
commitment, to be approved in writing by the planning authority prior to commencement of
development.  In order to secure this commitment a further condition is proposed as follows: 
“Prior to the commencement of development, a revised Environmental Management
Plan (EMP) shall be submitted which includes a commitment that outputs of the
modelling and risk assessment process generated under the SEPA’s proposed Sea
Lice Risk Framework will feed into and influence the first end of cycle review.
Reason – In the interests of nature conservation.”
Page 14

Page 15

The applicant would also like to re-state that in terms of using best available science and
evidence to inform the EMP review mechanism they have proactively implemented a 3-year
wild fish monitoring programme in the Endrick Water catchment to develop a comprehensive
pre-development baseline on wild salmon population status.  
Friends of the Sound of Jura (FoSOJ)
After review the applicant considered that there are no new material considerations
presented in this latest response. The applicant acknowledges that the previous modelling
submissions submitted through the application consultation process have been well
discussed, however they would highlight some key points as follows.
• FoSoJ point out the change in the proposed threshold for sea lice modelling;
however, the sea lice risk framework is a proposal currently in development, a process in
which Mowi are collaborating with SEPA.
• There is as yet no standard protocol for modelling sea lice dispersal in Scotland, and
no standard method for presenting the results. Mowi has however used current established
and recognised methods of modelling sea lice dispersal, as used in Norway; these methods
have been demonstrated by scientific peer review to provide predictive capability of infection
pressure risk on wild salmonids. The conclusions of the sea lice modelling carried out by
Mowi, and submitted as an annex to the EMP, remain valid. This modelling which included
an assessment of the proposed development and Mowi’s existing sites at Carradale showed
that lice from farm reared salmon posed a low risk to migrating salmonids.
• An additional modelling assessment was submitted as new information by Mowi
(dated 12 April 2021) which included a cumulative assessment of sea lice risk from all active
fish farms in the Clyde area. The findings showed low lice levels (less than 0.1 lice m-2)
through most of the Firth of Clyde and Kilbrannan Sound.
• Mowi highlighted flaws in the structure and approach of the sea lice modelling
commissioned by FoSoJ. A review by Marine Scotland found that Mowi had reasonable
objections to the FoSoJ modelling.
• Neither Marine Scotland, nor any other consultee, has suggested that the risk to the
wild salmonid population from the proposal is significant, individually or cumulatively.
• The EIA report acknowledges that there are uncertainties in the effects on wild
salmonids from sea lice; however it is also recognised that EMPs presently provide the most
effective means of monitoring and mitigating the potential for adverse interactions between
farm reared salmon and wild salmonids. Mowi has developed its EMP framework on an
area-based principle and the Kilbrannan Sound EMP includes current active Mowi sites at
Carradale. 
5.0 ASSESSMENT
The late objections and submissions do not raise any new material planning considerations
over and above those set out, and fully assessed within the main report.  It is, however,
considered that the addition of a further condition requiring the EMP to take account of the
Sea Lice Risk Framework as offered by the applicant should be included. 
6.0 RECOMMENDATION 
Page 15

Page 16

It is recommended that planning permission be approved subject to a pre-determination
hearing and the revised conditions listed in Appendix 1 of supplementary report no. 1. 
Author of Report: Sandra Davies      Date: 22/5/23
Reviewing Officer: Peter Bain  Date: 23/5/23 
Fergus Murray 
Head of Development and Economic Growth  
Page 16

Page 17

Appendix 1
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 20/01345/MFF 
Standard Time Limit Condition  (as defined by Regulation) 
Additional Conditions  
1. The development shall be implemented in accordance with the details specified on
the application form dated 29/7/20, the Environmental Impact Assessment Report
dated 2020 (and subsequent addendum); and, the approved drawings listed in the
table below unless the prior written approval of the planning authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997 (as amended). 
The developer and subsequent operator(s) shall at all times construct and operate
the development hereby permitted in accordance with the provisions of the
Environmental Statement accompanying the application with mitigation measures
adhered to in full, and shall omit no part of the operations provided for by the
permission except with the prior written approval of the Planning Authority. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1 of 12 - 25/8/20
Supplementary
Location Plan
2 of 12 - 25/8/20
Site Coordinates 3 of 12 - 12/8/20
Plans and
Elevations Typical
Pen Design Top
Net Support
4 of 12 - 12/8/20
Feed Barge 5 of 12 - 25/8/20
Underwater
Lighting Technical
Sheet
6 of 12 - 25/8/20
Plans and
Elevations Typical
Net Design
7 of 12 - 12/8/20
Plans and
Elevations Typical
Mooring Design
8 of 12 - 12/8/20
Plans and
Elevations -
9 of 12 - 12/8/20
Page 17

Page 18

Proposed Site
Configuration
Plans and
Elevations Typical
Pen Design
10 of 12  12/8/20
Admiralty Chart
Extract
11 of 12  25/8/20
Site Plan 12 of 12  25/8/20 
Reason: For the purpose of clarity, to ensure that the development is constructed and
operated in the manner advanced in the Environmental Impact Assessment Report,
upon which the environmental effects of the development have been assessed and
determined to be acceptable. 
2. The development hereby approved shall not be operated other than with a biomass of
2475.54 tonnes or less. 
Reason:  The environmental effects of this proposal have been assessed against this
maximum biomass.  
3. Notwithstanding the details given in the Predator Mitigation Plan, no Acoustic
Deterrent Devices (ADDs) shall be deployed at the site hereby approved. 
Reason:  In the interests of nature conservation.  This planning application has been
determined on the basis that ADDs will not be used. The use of ADDs would be
regarded as a material change to the proposal. 
4. The site shall not be stocked until the wild fish monitoring plan has been agreed which
shall include a requirement to monitor the juvenile salmon population in coastal waters
within a zone of 30km from the Management Area. 
Reason: In the interests of nature conservation. 
5. As part of the end of cycle review, to be undertaken no later than 6 weeks prior to the
end of the growth cycle, the site shall not be restocked until the review has been
agreed by Argyll and Bute Council in consultation with NatureScot. 
Reason:  In the interests of nature conservation. 
Page 18

Page 19

6. There shall be no use of drift nets, vertical static nets or gill nets to recapture escaped
fish. 
Reason: In order to avoid putting marine birds, including guillemots, shags, divers and
others at risk. 
7. The pole mounted top net system hereby approved shall be as noted below unless
otherwise agreed in writing with the planning authority in consultation with NatureScot: 
Height (m)
Perimeter Pole Support Maximum height of 5m above the water
surface 
Mesh Size (mm)
Sidewall netting from the bottom to 2m
height
25
Ceiling net panel and remaining sidewall
netting
100
Colour Dark grey to black 
This shall be subject to review, underpinned by systematic monitoring.  The Planning
Authority shall be immediately notified in the event of emergence of patterns of
entanglement or entrapment of marine birds. 
Reason:  To minimise the risk to all bird species and to ensure that there are no
significant effects on the qualifying interests of the Ailsa Craig Special Protection Area.   
8. The proposal shall be undertaken strictly in accordance with the following criteria:
(a) Operators shall maintain daily records of wildlife entanglement / entrapment
using a standardised proforma which shall be submitted to the planning authority and
copied to NatureScot at 6 monthly intervals or other specified period to be agreed in
writing with the planning authority in consultation with NatureScot. The first proforma
shall be submitted 6 months after the development is brought into use unless
otherwise agreed in writing with the planning authority in consultation with
NatureScot. 
(b) In the event of any significant entrapment or entanglement of gannets, and
any other SPA interests identified as relevant to a particular fish farm (e.g involving
three or more birds of any named species in any one day and / or a total of ten or
more birds in the space of any seven day period and / or repeat incidents involving
one or more birds on four or more consecutive days), the operators shall immediately
notify both the planning authority and NatureScot; 
(c) Adaptive management approaches should be agreed in writing with the
planning authority in consultation with NatureScot in advance of these being
implemented. 
Page 19

Page 20

Reason:  In order to ensure that there are no significant effects on the qualifying
interests of the Ailsa Craig Special Protection Area.  Gannet have an extensive
range and would have the potential to become entangled in nets. 
9. The site shall be operated, monitored and managed in accordance with the
Kilbrannan Sound Environmental Management Plan (EMP) attached to the planning
portal on 22 December 2022 and subsequent approved variation thereof.  The EMP
should be reviewed and updated if required following the adoption by Scottish
Government of any new policy framework relevant to wild salmonid interactions. Any
proposed amendments to the EMP shall be submitted to and approved in writing by
the planning authority prior to the changes being implemented. 
Reason: In the interests of nature conservation. 
10. The site shall be operated in accordance with the North Kilbrannan Sea Lice
Management and Efficacy Report dated 2020 or any subsequent updates of this
document which shall be submitted to and approved in writing by the planning
authority. 
Reason: In the interests of nature conservation. 
11. The site shall be operated in accordance with the North Kilbrannan Containment and
Escapes Contingency Plan dated 2020 and the North Kilbrannan Inspection and
Maintenance Schedule with the exception of any proposed actions contained within
these documents limited by other conditions on this planning permission.  Any
subsequent updates of these documents shall be submitted to and approved in
writing by the planning authority. 
Reason: In order to minimise the risk of escapes in the interests of nature
conservation. 
12. In the event that the development or any associated equipment approved by this
permission ceases to be in operational use for a period exceeding three years, the
equipment shall be wholly removed from the site thereafter, unless otherwise agreed
in writing by the Planning Authority. 
Reason: In the interest of visual amenity and to ensure that redundant development
does not sterilise capacity for future development within the same water body. 
13. The finished surfaces of all equipment above the water surface, excluding the feed
barge, but inclusive of the surface floats and buoys associated with the development
hereby permitted (excluding those required to comply with navigational
Page 20

Page 21

requirements) shall be non-reflective and finished in a dark recessive colour in
accordance with the details provided in the EIAR unless otherwise agreed in
advance in writing by the planning authority.   
Reason: In the interest of visual amenity. 
14. All lighting above the water surface and not required for safe navigation purposes
should be directed downwards by shielding and be extinguished when not required
for the purpose for which it is installed on the site. 
Reason: In the interest of visual amenity. 
15. Prior to the commencement of development a further Waste Management Plan
shall be submitted to and approved in writing by the planning authority. This shall
include details of the arrangements for the storage, separation, and collection of
waste from the site including proposals for uplift from areas where fish farm
equipment has become detached from the site. 
Reason: To ensure that waste is managed in an acceptable manner. 
16. Prior to the commencement of development, a communications and monitoring plan
in relation to the use of bath medications shall be submitted to and approved in writing
by the Planning Authority.  This shall detail the method by which other marine uses
shall be informed of general safety information that should be considered by water
user when in the vicinity of the farm, including when bath medications are being
actively use at the site.  Thereafter the development shall be carried out wholly in
accordance with the Communications and Monitoring Plan unless otherwise agreed,
or varied, in writing with the Planning Authority. 
The Communications and Monitoring Plan shall include: 
a.  A Communications Plan detailing the method by which other marine users
shall be informed of general safety information that should be considered by water
users when in the vicinity of the fish farm, including when bath medications are being
actively used at the site.  The Communications Plan shall be informed  by the
conclusions of the supporting information “Assessment of Potential Risk to Human
Health Following Use of Azamethiphos, Deltamethrin and Hydrogen Peroxide; WCA;
Dec 2021”,
b. A Monitoring Plan to investigate the dispersal and dilution of Hydrogen
Peroxide following its use in bath treatments on the site and the use of these findings
to review and update the conclusions in the aforementioned supporting information,
and the Communications Plan.  The Monitoring Plan shall include provision for
reporting the findings to the Planning Authority and securing its written approval for
any resultant amendment that may be proposed to the Communications Plan. 
Page 21

Page 22

Reason: In order to inform marine users of potential risks to human health in the
vicinity of the fish farm. 
17. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended water supply and system required to serve the
development has been submitted to and approved by the Planning Authority. 
Reason: In the interests of public health and in order to ensure that an adequate water
supply in terms of both wholesomeness and sufficiency can be provided to meet the
requirements of the proposed development and without compromising the interests
of other users. 
18. The Noise Rating Level attributable to the operation of the approved fish farm
operation shall not exceed background noise levels by more than 3dB(A) at any
residential property measured and assessed in accordance with BS4142:2014.   
Reason: In order to protect the amenities of the area from noise nuisance 
19. Prior to the commencement of development, a revised Environmental Management
Plan (EMP) shall be submitted which includes a commitment that outputs of the
modelling and risk assessment process generated under the SEPA’s proposed Sea
Lice Risk Framework will feed into and influence the first end of cycle review.
Reason:  In the interests of nature conservation. 
Page 22

Page 23

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 20/01345/MFF
Planning Hierarchy: Local Application
Applicant: Mowi Scotland Ltd
Proposal: Formation of fish farm (Atlantic Salmon) incorporating twelve
120m circumference circular cages and siting of feed barge
Site Address:  North Kilbrannan Fish Farm North of Cour Bay Kilbrannan
Sound East Kintyre 
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
 Formation of fish farm (Atlantic Salmon) incorporating twelve 120m
circumference circular cages 
Siting of feed barge 
(ii) Other specified operations
 Maximum biomass 2475.54t 
(B) RECOMMENDATION: 
It is recommended that planning permission be approved subject to a pre-
determination hearing and conditions. 
(C) CONSULTATIONS:   
SEPA (dated 1/1/20, 15/4/21):  No objections. 
Page 23

Page 24

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
We have received and processed an application for this proposal under The Water
Environment (Controlled Activities)(Scotland) Regulations 2011 (as amended)
(CAR).  The licence (CARL/1161821) has been issued. 
SEPA consultation (dated 10/12/21) in response to the submission third party
modelling and concerns over azamethiphos use and EQS exceedances.
Whilst the most recent report still implies that the Azamethiphos on the licence will
not comply, SEPA believe that this is still unlikely, for the following reasons:
 There is evidence in the scientific literature that the “tracer”
method used by MTSCFD can be less accurate that the more
often used “particle tracking” approach.  The tracer method can
lead to larger areas shown to be above EQS. This is an issue
with the method, not the turbulence model used. SEPA has
compared both approaches in our model and found the tracer to
give larger area predictions but similar peaks to the “particle
tracking” method.
 The turbulence model used by MTS-CFD is likely to result in low
levels of dispersion, by default. Normally, this would be checked
against a dye/drogue release.  Kilbrannan sound is dynamic and
dispersion in this area is likely to be greater than a default
turbulence model suggests.
 SEPA believe there may be other issues with the approach
which would be revealed if their model was compared against
suitable drogue/dye data or if we had access to the modelling
files. 
 All modelling used to derive a consent is conservative. Real
world dispersion is often found to be greater due to the influence
of meteorological and oceanographic processes which cannot be
easily included in models. MTS-CFD modelling has be
undertaken during a two-week period of zero wind or a two-week
period of easterly winds. These conditions are not likely to occur
often. 
Marine Scotland Science (18/9/20, 15/2/21, 17/3/21,14/5/21 and 11/4/23): It is
noted that a CAR licence already granted by SEPA covers the proposed cage size
and arrangement and the proposed biomass.
The proposed site sits outwith any Location Guidelines categorised water body.  The
applicant’s submitted assessment shows that there will be no significant nutrient
impacts either at the site level or cumulatively in the area as a result of this site.
It should be noted that there are several other marine fish farm sites proposed in the
vicinity which may impact the disease management areas.  The site proposed by the
Scottish Salmon Company on the north coast of Arran which currently pending
approval of planning permission would not directly influence the proposed site if it
was the only other additional active site.  However several other proposed sites which
are at the screening and scoping stage of the planning process could further impact
disease management areas in the vicinity if they were developed with the potential
for significant changes to the disease management areas in the south west. 
The location of the site lies outwith current farm management areas (FMAs) but is
expected to be included within the nearest FMA M-47 which includes the applicant’s
existing Eilean Grianain site (Carradale North and South).  The applicant has stated
Page 24

Page 25

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
that these sites will be operated synchronously, being stocked at the same time with
the same year class of fish and observing a synchronous fallow period. 
Wild Fisheries
There is one other aquaculture site within 15km, as such, cumulative factors may
come in to play.  Kintyre and the Isle of Arran are known to have fisheries for salmon
and trout.  The development has the potential to cause risks to wild salmonids. 
Environmental Management Plan
The supplied EMP meets the criteria required by Marine Scotland.  It should be noted
that no in feed treatments are licenced for use on the site. 
MSS Comments (15/2/21)
The applicant has provided further details of the treatment of cleaner fish and the
escapes contingency plan has been updated. 
The applicant has submitted details of environmental site surveys undertaken at the
site by Aquastructures in accordance with A Technical Standard for Scottish Finfish
Aquaculture.  Environmental parameters wind, wave and current have been
assessed on 10 and 50 year storm periods.  A detailed mooring line analysis has
been conducted for the sub-surface grid and pen floating collars and the feed barge
to specify the standard of equipment required for the predicted forces.  Given that
the equipment used for pen moorings match or exceeds the specification and is
installed and maintained appropriately, the information provided is deemed
satisfactory. 
The applicant has detailed a series of remedial and improvement actions being
implemented following the detailed root cause analysis on the containment breach
at Carradale. 
MSS Response (17/3/21)
Consultation response confirming acceptance of further information on revised
procedures following escape. 
MSS Response (14/5/21)
Comments in relation to third party sea lice hydrodynamic model submitted. 
MSS Updated comment (11/4/23): 
Aquaculture Animal Health 
Disease Management Area
There are no further new developments proposed in nearby production areas.  The
new sites previously proposed in the surrounding areas have not been developed
(see appended map).  There have been no subsequent planning applications
received for the sites proposed by Dawnfresh Fish Farming following the 2019
screening and scoping applications; and The Scottish Salmon Company site on the
North coast of Arran was refused planning permission.  Therefore, the extension of
the existing E Kintyre 19c disease management area (DMA) northwards to
encompass this proposed site will not currently be impacted by any other site
developments. 
Sea Lice History
In the most recent production cycle, numbers of the adult female sea louse
Lepeophtherius salmonis at the applicant’s nearby Eilean Grianain site have
Page 25

Page 26

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
remained below MS reporting levels to date since stocking in October 2021.  Towards
the end of the production cycle sea lice levels have risen above the CoGP suggested
criteria intermittently. 
Other comments previously provided on sea lice management measures proposed
by the applicant for this application are still deemed relevant and satisfactory and
there are no change to these. 
Environmental Health (24/9/20):  Water supply condition relating to feed barge
recommended. 
Royal Yachting Association (dated 17/2/20):  No objections. 
NatureScot (14/10/20 and 25/2/21): The proposal raises natural heritage issues of
national interest we therefore object to this proposal until further information is
obtained in relation to the Endrick Water SAC.
The proposal could affect the internationally important Ailsa Craig SPA and NS object
to the proposal unless it is made subject to conditions so that works are done strictly
in accordance with specified mitigation.
The proposal will not raise landscape or visual issues of national importance.
We are content that the proposal will not result in significant impacts upon any priority
marine habitats or species.
Response dated 25/2/21 following the submission of additional information:
The proposal could be progressed with appropriate mitigation.  However, because it
could affect internationally important natural heritage interests, we object to this
proposal unless it is made subject to conditions so that the works are done strictly in
accordance with the mitigation detailed in our appraisal. 
NatureScot (10/5/23): We acknowledge that the available information, both in terms
of advancements in lice modelling capabilities and knowledge of post-smolt migration
routes, has advanced significantly since this planning application was submitted in
July 2020. On the basis of the new information available, some additional concerns
arise regarding the potential risk that this development could pose to the Endrick
Water SAC.     
The Environmental Management Plan (EMP) approach was developed to address
the complex issue of lice management through the planning process. The EMP is an
iterative process that uses monitoring results gathered over the course of a
production cycle to assess the level of risk posed to migrating post-smolts, and where
relevant implement appropriate management to address any such risk. By ensuring
that the EMP incorporates an end of production review and by requiring a condition
that the site shall not be restocked until that review process is complete, the Local
Planning Authority (LPA) is provided with an enforceable mechanism to address any
elevated risk that is identified. 
Concerns arise with regards to the consenting of additional biomass in areas
identified as higher risk through screening modelling carried out by SEPA as part of
the development of their sea lice risk framework. We acknowledge these concerns
and agree that the best available information should be considered as part of the
planning process. 
Following further discussions with SEPA we are satisfied that provided the EMP
incorporates a review process and a commitment not to restock until the review is
complete, the LPA will have a mechanism to integrate the detailed modelling carried
out by SEPA as part of their sea lice risk framework within the EMP review. This will
Page 26

Page 27

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
allow the LPA to take appropriate action for this site, should any elevated risk be
identified through either the EMP monitoring or the modelling and assessment
required as part of the forthcoming SEPA framework. Depending on the level of risk,
this could include requiring enhanced sea lice management measures, reduced
stocking or ultimately preventing the site from being restocked. As a result, we are
satisfied that the LPA will have a mechanism to consider the best available
information and take appropriate action, should it be required to address any risk in
the future, therefore ensuring that this proposed site will not result in an adverse
effect on the integrity of the Endrick Water SAC.     
We would also highlight that should this site be granted planning permission, we
expect that SEPA’s sea lice risk framework will be fully implemented by the end of
the first production cycle. We therefore anticipate that the detailed modelling and risk
assessment process required under SEPA’s framework will feed in to and influence
the first end of cycle review process required as part of the EMP. On this basis, we
are satisfied the LPA can conclude that appropriate measures are in place to ensure
that the farm will not compromise the conservation objectives of the Endrick Water
SAC and will not therefore result in an adverse effect on site integrity.   
NatureScot (dated 10/5/23):  We are not aware of freshwater pearl mussels
(FWPM) in any watercourses within 1 km of the proposed North Kilbrannan Fish
Farm, however please note that this does not mean that the species may not be
present. NatureScot did commission a Kintyre wide FWPM survey of potentially
suitable watercourses in 2015, however unfortunately access was not granted at the
time to survey the Crossaig Burn. 
West Highland Anchorages and Moorings Association (dated 31/8/20):  This
application is in the Clyde Area where WHAM is not competent to comment. 
Argyll and District Salmon Fishery Board (dated 31/7/20): Object to the
proposal. 
The current planning and regulatory system does not sufficiently protect wild fish and
a new regulatory system, as recommended by the Salmon Interactions Working
Group, should be put in place prior an any growth in consented biomass.
Recent history of escapes in high energy locations which offers no assurance of
containment in the pens for the new proposal.
The conservation status of local salmon populations which may suffer permanent
adverse damage from aquaculture related additional pressures.
This farms sits on a likely migratory path for wild salmon from numerous rivers in
Loch Fyne, west Arran and East Kintyre and possibly the Kyles of Bute and the Clyde
Estuary, increasing the potential for negative interactions.  We previously issued a
holding objection and requested that the EMP be revised to include details of how
the plan will be protective of the freshwater salmon population of the Endrick Water
SAC. 
Marine and Coastal Development Policy Officer (dated 20/10/20): Comments
made in relation to benthic impacts, water column impacts, interaction with
predators 
Biodiversity Officer (dated 9/1/21): The applicant has answered queries raised in
relation to wild salmon interests by developing the EMP where partnership working
and cooperation between the applicant and the stakeholders is embedded in the
plan along with the overall aim and the elements to address issues relating to sea
lice, I recommend that this working document is signed off by all parties prior to
Page 27

Page 28

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
determination by the Planning Authority.  In relation to ADDs and other predator
control, the applicant has agreed not to use these and is reliant on the design of the
nets to manage this issue. 
Northern Lighthouse Board (22/1/21): No objections subject to navigation
conditions. 
Clyde Fishermen’s’ Association (dated 18/3/21):  Object to the application on
the grounds of lack of cooperation with aquaculture companies, loss of fishing
grounds, chemical pollution and sewage, loss of shelter / safe grounds and
economic loss and mortality and lice. 
Fisheries Management Scotland (9/10/20):  Object to the proposal for the following
reasons:
The current planning and regulatory system does not sufficiently protect wild fish and
a new regulatory system, as recommended by the Salmon Interactions Working
Group, should be put in place prior an any growth in consented biomass.
Recent history of escapes in high energy locations which offers no assurance of
containment in the pens for the new proposal.
The conservation status of local salmon populations which may suffer permanent
adverse damage from aquaculture related additional pressures.
This farms sits on a likely migratory path for wild salmon from numerous rivers in
Loch Fyne, west Arran and East Kintyre and possibly the Kyles of Bute and the Clyde
Estuary, increasing the potential for negative interactions. 
West Coast Regional Inshore Fishery Group:  No response to date. 
Argyll Fisheries Trust:  No response to date. 
Historic Environment Scotland (dated 28/9/20): We do not object to the
proposals. Although the North Kilbrannan, Carradale Fish Farm would be located
outside of Cour Bay and would be of limited visibility in views to and from the
Category A-listed Cour House (LB18360) itself, we consider that significant impacts
on the setting of House are unlikely. Therefore, we wish to reiterate our previous
advice (19/02422/SCRSCO, 22 January 2020) that we have no further comment to
make regarding the above proposals. 
East Kintyre Community Council: Support the application.  Although the
application falls within the Tarbert and Skipness Community Council area it also
impacts directly upon Carradale and East Kintyre.  Carradale has a very good
working relationship with the local MOWI team and we are delighted that the
company offers such good employment and career opportunities otherwise
unavailable to local residents.  Carradale Harbour is utilised by MOWI as the shore
base for their operations and we are keen to encourage this to continue.  East
Kintyre Community Council and Carradale Community Trust are working in
partnership with MOWI to improve harbour facilities.  Dredging and pontoons are
developments in the pipeline, both will greatly enhance the harbour area for locals
and tourists alike, 
Tarbert and Skipness Community Council (dated 2/10/20 and 18/2/21):  Object
to the proposal.  This is a very exposed site and there is concern about escapes
give the recent escapes from North Carradale Fish Farm.  Concern about
contamination of the sea bed.  The Tarbert fishing fleet will lose yet another area of
sea bed which will make profitable fishing even more difficult.  Any issues which
Page 28

Page 29

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
affect the fishing fleet will undoubtedly have a direct effect on employment in the
area.  The fish farm will detract from wild seascapes and will have a negative
impact on tourism.  Waste (non-fish) management plans shown in the EIA do not
leave one with a lot of confidence.  Mostly stating that “Disposal must comply with
regulations” without showing the operational method which will be utilised to
achieve that end.
Concerned about the issues raised by the use of azamethipos in this setting. 
NHS Highland (dated 18/7/22):  NHS Highland is not able to give a definitive
opinion on the safety of wild swimming in the vicinity of the fish farm simply based
on this report. However, based on the available evidence.  NHS Highland does not
wish to object to the application. 
NHS Highland Response to additional reports submitted by objector (dated
29/3/23):  The documents that have been submitted and that you forwarded to me
raise further issues about the potential risks from chemicals that would be used
should the planning application be granted and should the development proceed.
There are also further comments about the validity of the work that was
commissioned from WCA as part of the
application.  As I noted in my previous response, we do not employ ecotoxicological
or chemistry experts, so it was not possible to give fully informed comment on the
report. Likewise, where specific issues have subsequently been raised about
toxicology or modelling it is not
possible for NHS Highland to give a fully informed view. The nature of the evidence
in this area means that there remain many assumptions and a limitation in the
amount of direct evidence. It would be helpful to have both a systematic
independent review of the health effects and the health impact of fish farms and
their chemicals in general and an independent review of the local position. In the
absence of these the position of NHS Highland remains unchanged. 
North Ayrshire Council (dated 21/3/22): No comments. 
(D) HISTORY:   
04/01749/MFF – consultation from Crown Estates on screening opinion 
06/00873/MFF – Proposed fish farm sites at Rubha Riabhach and Port Fada.  Application
withdrawn. 
19/02422/SCRSCO – Screening and scoping for proposed marine fish farm. 
(E) PUBLICITY:   
ADVERT TYPE:
Regulation 20 Advert Local Application
EXPIRY DATE: 19.02.2021 
ADVERT TYPE:
ENVASA Addendum EA Advert
EXPIRY DATE: 14.02.2021
Page 29

Page 30

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
ADVERT TYPE:
Environmental Assessment Regs Adv (28)
EXPIRY DATE: 11.10.2020 
ADVERT TYPE:
Regulation 20 Advert Local Application
EXPIRY DATE: 02.10.2020 
(F) REPRESENTATIONS:   
(i) Representations received from: 
A list representations can be found in Appendix D 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
Objections 
Human Health / Immersion in Water and Wild Swimming 
Concerned about the impact of fish farm medication accumulation in proximity to where
people swim at Cour Bay and Grogport; 
SEPA has advised that they do not assess the impact of organophosphates and other
pollution on swimmers and other recreational users before they issue a car licence.  I believe
that SEPA has failed to comply with the Water Environment (Controlled Activities (Scotland)
Regulations 2011 which requires them to assess the impact on other marine users before
issuing a CAR licence. 
Expert opinions have been submitted critiquing the conclusions of the SSPO (now Salmon
Scotland) commissioned report on the impacts of fish farm medications on human health. 
These are from Professor Malcom Hooper, Emeritus Professor of Medicinal Chemistry and
Mr Boetimann Isaack, Principal Advisor, Fish River Occupational Hygiene. 
It has been requested that comments be sought from NHS Highland on the independent
expert opinion papers.
The use of organophosphates in or around these waters is totally unacceptable and SEPA’s
licencing of azamethiphos here is a fault, as no assessment of its threat to human health
has been made in spite of studies that implicate it. 
Comment:  NHS Highland has been consulted on the application supporting document on
this issue and also the expert opinions submitted by a third party.  NHS Highland has
confirmed that they do not wish to object to the proposal.  For further information see
assessment. 
Pollution 
Page 30

Page 31

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Kilbrannan Sound is an estuary which is not dispersive and therefore prone to stagnate. 
SEPA has relied on their assessment that the Kilbrannan Sound is dispersive which
contradicts multiple other official reports which state that is stagnant.  As SEPA has admitted
to faults in their granting of the CAR licence, there is reason to doubt their credibility, so the
Council needs to justify their decision if they decide to ignore other official documents which
support our local observations. 
Argyll and Bute Council cannot be sure that the accumulative pollution from multiple fish
farms will not endanger public safety, so the precautionary principle must apply. 
Comment: SEPA are the Council’s expert advisor on these issues.  They do not object to
the proposal and have issued a car licence. 
Impacts on Wild Salmonids 
Concern that sea lice emanating from fish farms will decimated the stocks of wild salmon
and sea trout. 
Mass escapes and deaths at Carradale recently demonstrate that they are not well
managed and that the operators cannot guarantee that there will not be more escapes. 
Escaped MOWI farmed fish are being found in the river Garnock which threaten the wild
salmon stocks.  The escaped fish are attracting people to come and fish for them who have
not bought permits. 
The proposed site is a key migration route for salmonids spawning in Loch Fyne and the
Clyde.  It would be irresponsible to site the fish farm in the Kilbrannan Sound which has
been recognised by both Marine Scotland Science and the River and Fisheries Trust of
Scotland as one of the most sensitive areas for Atlantic salmon in Scotland. 
This environmentally catastrophic industry will eventually be regarded with the same horror
that we view rainforest deforestation for palm oil – it is simply a matter of time and I urge
you not to be responsible for adding Cour Bay to the casualty list.  The industry is completely
self-regulated which entirely at odds with any other form of farming.  As a result, it destroys
the seabed, releases tonnes of chemicals into the marine environment and it is a complete
disaster for wild salmon and sea trout due to the spread of disease, sea lice and the genetic
threat posed by interbreeding with escapees. 
EMPs are insufficient to enable the Council to meet the test in Article 6(3), and is inadequate
mitigation for the impacts likely to occur on wild salmonids, including those protected under
the designation of Endrick Water SAC. 
While we wait for the revised regulatory system, the Council still has duties under the Nature
Conservation (Scotland) Act 2004 in relation to the furthering of nature conservation and
biodiversity, in this case in relation to wild salmon and sea trout.  In this context the Council
should seek to continue, as it has recognised in relation to other recent fish farm applications
to seek to ensure that the goals of the inter-government North Atlantic Salmon Conservation
Organisation (NASCO) are met.  For sea lice, NASCO best practice is for “100% of farms
to have effective sea lice management such that there is no increase in sea lice loads or
lice-induced mortality of wild salmonids attributable to the farm.  For escapes, NASCO best
practice is to ensure that “100% of farmed fish are retained in both freshwater and marine
production facilities.  The Council should not only judge this application from MOWI as
against NASCO objectives and, throughout its deliberations, place the strongest possible
Page 31

Page 32

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
emphasis on meeting the NASCO objectives, it also has strict legal duties specifically to
protect the Atlantic salmon population of the Endrick Water SAC. 
Given the history of escapes from fish farms, it will not be possible for the Council rationally
to conclude that there will not be escapes from the site proposed at North Kibrannan that
can have an impact on the site integrity of the Endrick Water SAC. 
No mitigation is possible for an escape once it occurs.  As such, it would be irrational of the
Council to grant planning permission for this high energy site, which is a more exposed
location than the Carradale North site. 
Wild salmon smolts leaving the Endrick Water SAC must swim through the Firth of Clyde
and / or Kilbrannan Sound to reach the open sea.  As Appropriate Authority, Argyll and Bute
Council must be certain beyond reasonable scientific doubt that these salmon will not be
affected by lice or other effects from the new fish farm and such certainty is clearly
impossible.  Hydrodynamic modelling show that water often flows anti clockwise around
Arran, so the wild smolts may well swim this way.  The modelling shows that sea lice
released by multiple fish farms are carried into Kilbrannan Sound, where they would over
lap with lice from the North Kilbrannan farm and from Mowi’s existing 5000 tonne farm at
Carradale.  The Council must declare on what basis it is certain that this cumulative impact
will not harm the integrity of Endrick Water SAC, otherwise it invites a judicial review. 
The applicant has failed to consider the existence of an autumn smolt run within the Endrick
SAC for which there is growing evidence. 
The development would also adversely affect sea trout. 
There is no clear and robust enforcement mechanism in the EMP.  There is insufficient
regulatory capacity within the planning department to enable it to take a consistent and
regular inspection and enforcement role here. 
It is well established by scientific research that salmon are most vulnerable to lice infestation
at the post smolt stage so they will definitely be impacted upon by this development. 
The North West Angling Trust Fisheries Consultative Council (NWATFCC) represents the
affiliated and collective interests of the five major NW game fisheries – Border Esk, Eden,
Derwent, Lune and Ribble.  The NW river fisheries comprise 30% of England’s reported rod
caught salmon and are in the immediate vicinity of Argyll salmon farm developments.  The
Kintyre peninsular and Northern Ireland coast forms the pinch point and pathway for our
migrating salmon smolts.  On 25th September NWATFCC received the first reported
captures of farmed salmon in the Solway Firth rivers Border Esk, Eden, Derwent and Annan,
followed by further reports from the West Cumbrian Ehen and the River Lune on the
Morecambe Lancashire coast.  MOWI are responsible for the following recent incidents of
escapees:
16,000 salmon at Carradale in June 2015;
24,752 salmon froma holed net in Hellisay in November 2018;
23,970 due to net failure and equipment damage – Hellisay in October 2019;
73,600 pen failure on Colonsay in Jan 2020;
48,834 mooring failure and storm damage to Carradale North cages in August 2020.
The Council should take full account of MOWI’s present record in failing to meet industry
standards, its wider responsibility under the European Habitats Directive to protect the
environment and noted species and further the international NASCO measures and targets
designed to protect and restore North Atlantic salmon populations.
Page 32

Page 33

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Crossaig Burn which is located less that 1km from the site has not been listed as a local
salmonid river by the ADSFB.  I suggest the reason that Crossaig Burn is not listed is
because it has not been fished by angler in recent years and netting is not currently taking
place but if the burn and its estuary were monitored effectively and independently, it would,
I suspect, reveal the continued presence of a concentration of wild salmonids, that because
of the proximity to this proposed fish farm will be affected adversely. 
THE MOWI proposed Cour Bay site is located between 3 salmon rivers on east Kintyre
(Carradale Water, Claonaig Water and Skipness River) and 2 rivers on west Arran (Machrie
River and Iorsa River).  This proposal to site an open net salmon farm equidistant from 5
wild salmon rivers demonstrates a complete indifference by MOWI to any form of
sustainable protection of wild salmon stocks. 
The current planning and regulatory system does not sufficiently protect wild fish and a new
regulatory system, as recommended by the Salmon Interactions Working Group should be
put in place prior to any growth in consented biomass. 
The proposed site is on the likely migratory path that wild salmon take from numerous rivers
in Loch Fyne, west Arran and east Kintyre and possible the Kyles of Bute and the Clyde
Estuary. 
The proposed salmon farm also has the potential to impact salmon and sea trout
populations across Ayrshire’s 6 important salmon and sea trout rivers and their tributaries. 
There are numerous coastal burns that may also be potentially impacted both where there
are no angling interests nor bodies to represent the ecological value of these watercourses. 
The proposed development will have an adverse impact on juvenile sea trout.  They tend to
remain in local coastal waters and have a tendency to be strongly impacted by sea lice. 
The Loch Lomond system (including the Endrick SAC) has perhaps one of the last notable
runs of sea trout on the Scottish west coast mainland, with recent catches numbering up to
2,000 per annum.  Unless the sea trout stocks remain close to the Leven mouth they will in
all likelihood be impacted by this development. 
The proposed salmon farm has the potential to impact salmon and sea trout populations in
the River Doon Board Fishery district. 
The proposed salmon farm has the potential to impact salmon and sea trout populations in
the Stinchar district. 
The MOWI sea lice dispersion modelling shown in the applicant’s EMP shows dispersal and
overlap with the proposed salmon farm at Millstone Point, North Arran.  This clearly shows
that attempting to assess and mitigate the risk from farms in isolation and without a cross
LPA spatial planning framework is unacceptable and open to legal challenge.  This
approach needs to be cumulative and proven to be effective to mitigate risk and meet the
legal requirements of SAC protection otherwise approval will be challenged and open to
judicial review. 
The Council cannot lawfully grant planning consent as it will have an adverse impact on wild
salmonids through sea lice, disease and escapes. 
There is a need to consider the cumulative impact of sea lice from all farms on the Greater
Clyde on wild salmon and sea trout, rather than considering the impact of lice from new or
expanded farms individually.
Page 33

Page 34

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The Greater Clyde currently has 16 licenced farm sites (counting Carradale as one).  Five
new farms are proposed at North Kilbrannan, South Bute, Cumbrae, Little Cumbrae and
Ardentinny with a substantial expansion proposed at Ardyne.  This would add more than
40% to the total farmed fish biomass and increase the number of fish hosts for sea lice by
the same amount. 
Friends of the Sound of Jura have been working with the hydrodynamic modelling company
MTS-CFD to model the dispersion of infectious sea lice larvae from these farms which
shows there is already a significant risk of harm. 
The Friends of the Sound of Jura commissioned model conflicts with the applicant’s
hydrodynamic model.  MOWI have made incorrect assumptions regarding the release of
sea lice and should be asked to resubmit their modelling. 
Argyll and Bute Council must be certain beyond reasonable scientific doubt that the
cumulative effect of consenting new or expanded fish farms in the Greater Clyde will not
add to the risk that the population of salmon in the SAC already faces. 
In light of the modelling commissioned by FOTSJ which shows there is already a significant
risk of harm, it is impossible to be certain beyond reasonable scientific doubt that the SAC’s
wild salmon population will not be harmed. 
There should be no expansion of fish farming on the greater Clyde at least until SEPA’s new
system for assessing and regulating this risk is place. 
Comment:  Wild fish interactions are considered in full in the report.  Until the new framework
is introduced by SEPA, the planning authority will continue to require Environmental
Management Plans to address this issue.  No moratorium on marine fin fish applications
has been announced. 
Impacts on Tourism 
It will not help the tourist industry and make people less likely to visit areas which have been
ruined by salmon farms. 
This proposal will ruin the existing tourist based business at Cour which provides more local
employment than the fish farm would.  The loss of holidaymakers and visitors would harm
other local businesses. 
Comment:  There is no evidence to suggest that the proposal would have a detrimental
impact on tourism. 
Landscape and Visual Impacts 
The area is relatively devoid of development and allows for exceptional panoramic views
from the road toward Arran and the greater part of the slopes of Meall nan Damh and Bheinn
Bharrain which are considered to be semi wilderness landscapes.  The proposed fish farm
would completely overshadow the panorama of Cour Bay.  It is considered that the
introduction of such a large scale, man-made feature (comprising straight geometric lines)
into a very open landscape area would have an adverse impact on the landscape quality of
this area which would be contrary to planning policy. 
Page 34

Page 35

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The proposal lies within the highly scenic narrows of the Sound separating Arran from
Kintyre, introducing industrial elements in a landscape highly values for tourism. 
The north east coast of Kintyre provides panoramic views of the North Arran National Scenic
Area and views to and from it are spectacular.  A large fish farm which can be seen from
miles away, up the coast and across the water, compromises this. 
Comment:  A Seascape, Landscape and Visual Impact Assessment (SLVIA) has been
submitted as part of the EIAR.  Officers concur with the conclusions of this report and would
find no reason to refuse the application on these grounds.  Further analysis of landscape
and visual issues are contained within the assessment. 
Historic Environment 
The proposal would have a detrimental impact on the setting of Cour House which straddles
the development of architecture in Scotland between the Arts and Crafts Movement and
Modernism, It responds to the untamed landscape with a palette of harmonious materials,
the whole house is spread upon a natural ledge in the landscape, hunkering down over huge
spreading roofs of stone slabs.  However, this house also has structural defects which the
owners hope to address.  Cour will cost a great deal to restore and repurpose as a
sustainable proposition.  The current proposal potentially conflicts with the visual amenity
demanded by high end tourism, and may also potentially impact on any future usage of
Cour Bay. 
The location of the proposed fish farm within clear, albeit partial, view of Cour House and
its estate mars the very unique characteristics of this very special historic environment.  We
expect further visibility assessment to be carried out and reconsideration of the location of
the pens. 
Comment: The EIAR contains a chapter on Cultural Heritage which includes the
consideration of Listed Buildings including the Category A listed Cour House.  This
concluded that there would only be a small proportion of the proposed site visible, at an
oblique view, with only limited change to the overall view, leading to ‘small’ adverse effects
and ‘moderate’ levels of significance.  In addition, Historic Environment Scotland who give
the planning authority advice on A listed buildings have not objected. See also assessment. 
Waste 
Storms have resulted in large amounts of plastic from fish farms washing up on the shore. 
Comment:  A condition is proposed in relation to this issue.  See also assessment. 
Economy and Employment 
MOWI claim that they will create jobs in the local area but that seems to be minimal with
people travelling a distance from outside the local area. 
Our marine environment is being sacrificed for the short term profits of foreign multinationals
who do not have the interests of Scotland at heart.  The number of jobs created is minimal. 
The proposal may impact on fishermen’s livelihoods. 
As salmon farming becomes increasingly intensive and automated it creates negligible local
employment opportunities.   
Page 35

Page 36

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The Loch Lomond Angling Improvement Association employ two full time water bailiffs,
when our fish stocks decline which they will do if this application was to go ahead, our
membership and visiting anglers will drop and those employees’ jobs will be in danger of
being lost. 
Concern that Norwegian owner fish farms are being allowed to operate in an area which will
have minimal long term benefit to the Scottish Economy and to the detriment of the very
local Cour economy. 
Comment:  See assessment. 
Policy 
The proposal would be contrary to Scotland’s National Marine Plan which requires that
concentrations of contaminants are at levels not giving rise to pollution. 
The proposed fish farm does not comply with the Council’s Bad Neighbour Policy. 
If this planning application is granted it needs to go to a judicial review. 
Comment:  See Assessment. 
Impacts on Wildlife 
Concern that seals may be culled if they are attracted to the farm.
There is a large colony of seals at Eilean Cour, just south of Rubha Riabhach which has
been omitted by the EIA. 
The use of ADDs can cause hearing damage and stress in dolphins, porpoises and whales. 
The use of ADDs at the proposed site in the narrowest part of the Sound, would effectively
block the Sound as a passageway of feeding ground. 
Otters are known to be present in the area.  The  proposed development is extremely close
to the shoreline and MOWI offer  no actual figures regarding the numbers of otters which
will perish in fish farm netting. 
The application provides no meaningful data or assessment on harbour porpoise, a
European Protected Species (EPS) and Priority Marine Feature (PMF) at the proposed
North Kilbrannan site.  There has been no attempt by the developer to address harbour
porpoise or EPS occurrence other than to comment that they are present at another MOWI
site at North Carradale.  The purpose of an EIA is to assess sensitivity level or risk of impact
to receptors like harbour porpoise.  MOWI’s planning submission is not fit for purpose and
the development proposal should be rejected. 
Clyde Porpoise CIC has acoustically surveyed all fish farms in the Clyde Sea Area and are
appalled by the noise levels and indiscriminate use of ADDs.  We are disappointed that the
Marine Scotland consultation response does not attend to the fact that there is a legal
requirement under protected species legislation for activities that have the potential to harm
/ disturb or harass EPS and require such applications to be processed through the EPS
licensing system.  We call on Argyll and Bute Council to reject this application on the
grounds that the use of ADDs without EPS licence is illegal. 
There are reputed to be freshwater mussels in a river discharging into the sea with 1000m
of the proposed site.  This species has not been mentioned by the Council’s biodiversity
Page 36

Page 37

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
officer nor by NatureScot in their response, but granting planning consent without assessing
the impact would not be lawful. 
Fish farm medications would have an adverse impact on a primary breeding ground for
lobsters on this stretch of coast. 
The constant noise, light and regular activity on the fish farm would drive cetaceans and
otters away. 
The site is unsuitable due to the proximity of a large seal colony. 
MOWI’s environmental survey is inadequate and we have proved that it has only considered
one quarter of the flora and fauna at the site.  If the Council accept such obviously flawed
evidence, they need to justify how their decision complies with the Nature Conservation
(Scotland) Act 2004 and other relevant legislation.  This may prove further grounds for a
judicial review. 
Comment: Since this application was submitted the applicant has confirmed that they will
not be using Acoustic Deterrent Devices at the site and therefore a condition is proposed to
ensure that they cannot be used as part of this planning permission.  Officers in consultation
with statutory consultees are content with the scope of the EIAR. With regard to fresh water
pearl mussel, NatureScot have advised that they are not aware of fresh water pearl mussels
in any watercourses within 1km of the proposal, however, this does not mean that they are
not present.  No evidence has been submitted to confirm this assertion. 
Impacts on Commercial Fisheries 
This site would sit on top of the primary lobster site, as Cour Bay is important as a lobster
nursery and on this stretch of coast both local people and commercial fishermen put their
creels. 
The development would remove an area used by fishermen.   A fishing area has already
been removed from south of Cour and there is a vast area south of Carradale which is an
MPA where no fishing can occur.  Life is hard enough and taking away where we fish is not
helping at all. 
Comment:  See assessment. 
Amenity 
Cour Farmhouse looks over Cour Bay and as a result all activity at the fish farm would be
seen and heard day and night. 
The proposal will result in unacceptable noise levels.  Experience of living 2.5km from the
Carradale farm that the noise comes from several different sources such as loudhailers
used by employees, radio music apparently being transmitted through external speakers,
engine noise and generator noise.  The EIA completely neglects to assess the noise created
by fish farm operations in the context of baseline background noise and this is an entirely
unacceptable omission. 
The residents in Pirnmill in Arran already suffer both light and noise pollution from the
existing Carradale North fish farm. 
Page 37

Page 38

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The proposal will result in noise and light pollution at nearby residential properties
(Sperasaig House, Cour) 
The proposed development will result in increased traffic on the B842. 
Comment:  See assessment. 
Salmon Fishing Rights 
Salmon netting rights exist in the Sound and the legal rights accompanying these would
almost certainly be compromised by the proposed development. 
The heritable salmon and sea trout fishing rights on this stretch of coast will be rendered
unusable by the intrusion of the development providing grounds for a legal challenge.  It is
not legally competent for the Crown Estate to grant a competing right. 
Comment:  This is a civil matter and not a material planning consideration. 
Concern over proximity of electricy cable 
The proposed site it close to SSE’s Hunterston/Crossaig sub-sea cables.  Damage to the
cables which could compromise the west coast of Scotland’s electricity supply, is an
unacceptable risk. 
Scottish and Southern Electricity Networks are concerned that insufficient information has
been provided to ensure the safe operation and maintenance of their Kintyre Hunterston
High Voltage Electricity Cables that are located approximately 400 m north of the proposed
fish farm. 
Comment:  This objection has subsequently been withdrawn (letter dated 24/11/20)
following dialogue between the applicant and the electricity company.  MOWI have made a
series of commitments to the SSEN and subject to these being adhered to SSEN do not
object. 
Concern Over the Principle of Marine Fin Fish Farming 
Salmon should be farmed on the land in closed containment. 
Our inshore waters in Scotland need a radical re-think in terms of sustainable fisheries, a
reduction in salmon aquaculture farms, control of dredging for scallops and bottom trawling,
a strategic look at overall sustainable communities, environmentally, economically and
socially for the long term. 
Having largely removed battery farming for poultry we do not understand how a much worse
agricultural regime is allowed for salmon.  The pursuit of cheap food by mistreating birds,
animals and fish must stop. 
I find it astonishing that Norwegian companies are being permitted to apply for fish farms in
Scottish waters, when Norway and other companies are in the process of banning open
cage salmon farms due to the adverse impact on the fish and the environment. 
Page 38

Page 39

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Responsible governments in countries such as Norway, Denmark and Canada are in the
process of banning all new open cage salmon fish farms in their seas. 
Concerns over animal welfare due to overcrowding and the spread of disease. 
Comment:  There is no ban on marine fish farming in Scotland and the planning authority is
required is consider these applications on their merits taking into account the advice of
statutory consultee and other material considerations including third party representations. 
Other 
Arran does not get to hear about the planning applications in Carradale as these are in
Argyll and Bute.  I think salmon farm applications should be circulated by order to any
potential affected local areas. 
The Council’s internal and external specialist advice looks like a dereliction of duty and so
unreasonable as to merit a judicial review. 
There has been no consultation with the nearest neighbour and owner of the shoreline. 
There have been numerous previous applications to site a fish farm on this site.  None were
accepted, the continuing applications are vexatious and since the last application the
evidence to refuse planning consent has increased. 
There is almost unanimous local opposition from the Community Council, residents,
businesses and commercial fishermen. 
MOWI’s official record of causing environmental damage is one of the worst in Scotland and
is attracting international concern.  They make promises to improve which they do not and
cannot keep.  With so much evidence against MOWI, the Council would be failing in their
duty to protect the environment if they grant consent.  The Council would not licence a bar
or a taxi driver with a poor history like this. 
The application conflicts with many of the recommendations of the Scottish Government’s
REC Committee report on Salmon Farming and the NASCO Treaty Guidance on Beat
Management Practices. 
The sea is too rough at the site and getting worse due to climate change which will inevitably
cause escapes and other damage. 
Comment:  There have been not previous planning application at this site for a fin fish farm
at this location.  A Crown Estate licence was consulted in 2006 but this was withdrawn.  See
assessment.  Neighbour notification has been carried out in accordance with the legislation
and the application has been advertised in the local paper. 
Representation 
A critique of the Fisheries Management Scotland objection has been submitted. Within this
it is stated that “What Fisheries Management Scotland does not say, is that under their
management (as well as that of their former guise – Association of Salmon Fishery Boards)
a total of 445,452 wild salmon and sea trout have been caught and killed from these local
populations since Government records began.  The impact of this mortality on local
populations is significantly greater than any impacts from salmon farming. 
Comment:  Noted.
Page 39

Page 40

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Support 
As a supplier of feed to the company, BioMar, voice their support for the application.  When
completed it is estimated that the farm will contribute £1.1M annually to the local economy
and a further £1.2M annual contribution to the Scottish economy from the operation of the
farm. 
The proposal is aligned with Argyll and Bute Council’s economic growth plan by providing
quality jobs in remote communities with a declining population.   
Fish farming plays a massive part in rural areas of Scotland.  Without the fish farming
industry there would be little if any employment in some of these areas.  I live and work in a
rural area and employ 30 staff who would not be living in these area were it not for the fish
farming industry. 
The aquaculture industry provides quality hobs in remote rural areas and helps to sustain
the population and keep schools open. 
The proposed salmon farm follows the recommendation of the Scottish Government’s 2018
Rural Economy Committee which suggests the salmon sector look towards offshore and
exposed locations where there are higher energy water flows. 
We are a globally operating market leading innovation-led fish farm technology business
with a growing footprint in mid Argyll and Kintyre.  Argyll has around 25% of Scottish
production of farmed fish worth around &250million based on quarter share of contribution
of fish farming to £1 billion GDP generated from fish farming in Scotland. 
As a senior manager in Akvagroup, I live and work in mid-Argyll.  In Scotland we employ 70
people and internationally 1500 people.   We currently employ 5 staff based in Argyll.  We
anticipate of approved, the North Kilbrannan farm development will increase our local
turnover significantly and allow us to secure and make further expansion of staff and
premises in Argyll. 
The farm and additional activity it brings will support local infrastructure improvements and
community projects in the Argyll and Bute area. 
MOWI have been the saviour of Carradale.  They have provided many local jobs and will
provide many more if the proposed construction is allowed to go ahead.  MOWI has given
a large sum of money to create the temporary village shop and other local ventures.  The
one thing MOWI could do is cover their equipment at the car park.  Carradale needs MOWI
and MOWI needs Carradale. 
MOWI (previously Marine Harvest) have been the principal sponsor of shinty for nearly 35
years.  The investment of a new fish farm in the area will bring a long term benefit to Shinty. 
Throughout the Highlands a high proportion of employees at the fish farm sites are local
and also shinty players, thus ensuring the continuation of many of our shinty clubs which
would otherwise have folded if these employees had to leave the area to find employment. 
Comment: Noted 
(G) SUPPORTING INFORMATION 
Has the application been the subject of:
Page 40

Page 41

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(i) Environmental Impact Assessment Report: 
THE EIAR covers the following topics:
 Benthic Environment;
 Water Column;
 Interaction with Predators
 Interaction with Wild Salmonids
 Species and Habitats of Conservation
Importance
 Navigation, Anchorage, commercial
Shipping and Other Uses
 Landscape and Visual Impact
Assessment
 Noise
 Cultural Heritage
 Waste Management
 Socio Economic and Recreation
 An addendum to the EIAR was later
submitted containing the following:
 Site Survey – North Kilbrannan,
Aquastructures
 Mooring Analysis – TR -31256-6526-1
Rev 1
 Mooring Analysis of Barge TR -31256-
6526-1 Rev 1
 Environmental Management Plan,
Kilbrannan Sound Fish Farms
 North Kilbrannan Inspection and
Maintenance Schedule
 On-site Emergency Response Plan,
North Kilbrannan
 North Kilbrannan Containment and
Escapes Contingency Plan.
☒Yes ☐No (if Yes insert
EIAR topics below)
Page 41

Page 42

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Note:  Given the length of time which has
elapsed since this application was
submitted in 2020, the applicant has
reviewed the EIAR in a document dated
27th January 2023.  This has confirmed that
there have been no material changes
affecting the assessment since the
submission of the planning application. 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☒Yes ☐No (if Yes
attach as an appendix) 
Appropriate Assessments are attached in the Appendix in respect
of Ailsa Craig SPA and Endrick Water SAC. 
(iii) A Design or Design/Access statement:    ☐Yes ☒No (if Yes insert
summary of key issues
below)  
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☒Yes ☐No (if Yes list
supporting documents
below) 
Clarification in Response to the Friends of Sound of
Jura Reply (document-22447522.pdf), dated 30 April
2021; 
Response to the Objections to Application
20/01345/MFF by the Friends of the Sound of Jura
and Cour Ltd, specifically the modelling studies by
MTS-CFD Ltd, dated 12 April 2021; 
LVIA VP4 Computer Model - (showing pen layout from
viewpoint minus trees); 
Appendix B – Drawings and Illustrations, North
Kilbrannan Fish Farm SLVIA (resubmission with
above amendment to VP4);
Applicant response to comments from statutory
consultees and public comments in the second round
of advertising/consultation; 
Applicant response to Marine Scotland Science
information request (further detail on mooring design
for pens and feed barge and detail on inspection /
maintenance frequencies); 
Page 42

Page 43

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Aquastructures technical note (TN-31256-6531-1) –
further analysis of mooring lines belonging to the
barge, and the mooring lines belonging to the pens
(as requested by Marine Scotland Science);
Aquastructures technical report (TR-31256-6531-1)
Mooring analysis of feed barge as per requirements of
the Technical Standard for Scottish Finfish
Aquaculture; 
Aquastructures technical report (TR-31256-6526-1)
Mooring analysis of fish pen equipment as per
requirements of the Technical Standard for Scottish
Finfish Aquaculture; 
Aquastructures technical report (SS-30079-6503-1)
Environmental Site Survey as per requirements of the
Technical Standard for Scottish Finfish Aquaculture; 
Applicant response to public representations from first
round of application advertising; 
Applicant response to further information requested by
Statutory consultees from first round of consultation;
Containment and Escapes Contingency Plan (for
proposed North Kilbrannan fish farm); 
On Site Emergency Response Plan (for proposed
North Kilbrannan fish farm); 
Inspection and Maintenance Schedule (for pen
equipment and moorings infrastructure -proposed
North Kilbrannan fish farm) ; 
Kilbrannan Sound Environmental Management Plan
(amendment to include commitments relating to wild
fish monitoring in the Endrick SAC and use of data for
adaptive site management). 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No (if Yes insert details of direction below)    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application.
Page 43

Page 44

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 12 – Zero Waste 
Liveable Places
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 29 – Rural Development
NPF4 Policy 32 – Aquaculture 
Argyll and Bute Local Development Plan adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management
Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement
of our Environment
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing Our Consumption 
Supplementary Guidance 
SG LDP  ENV 1 – Development Impact of Habitats, Species and Our
Biodiversity (i.e. biological diversity)
SG LDP ENV 2 – Development Impact on European Sites
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 12 – Development Impact on National Scenic Areas
(NSAs)
SG LDP 14 – Landscape
SG LDP ENV 16(a) – Development Impact on Listed Buildings
SG LDP 19 – Development Impact on Scheduled Ancient
Monuments
SG LDP ENV 20 – Development Impact on Sites of Archaeological
Importance
SG LDP BAD 1 – Bad Neighbour Development
SG LDP SERV 5(b) Provision of Waste Storage and Collection
Facilities within new development.
SG LDP CST 1  - Coastal Development
SG LDP AQUA 1 – Aquaculture Development 
Page 44

Page 45

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Annex A – Planning Process for Aquaculture Development
Annex B – Council Adopted Marine and Coastal Plans
Annex C – Responsibilities of Statutory Authorities in Relation to
Aquaculture Development
Annex D – Marine Planning Area for Aquaculture Development 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
Scotland’s National Marine Plan (2015)
Scottish Planning Policy (2014)
Scottish Parliament Rural Economy and Connectivity Committee:
Salmon Farming in Scotland (November 2018)
Circular 1/2007 ‘Planning Controls for Marine Fish Farming’ 
‘A Fresh Start – the Renewed Strategic Framework for Scottish
Aquaculture’ (Scottish Government 2009)
Scottish Executive – ‘Locational Guidelines for the Authorisation of
Marine Fish Farms in Scottish Waters’ (updated March 2018) 
‘Argyll and Bute Economic Strategy 2019 – 2023
Rural Growth Deal
Impacts of lice from fish farms on wild Scottish sea trout and salmon: 
summary of science, Marine Scotland last updated 12 March 2021  
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The reporters have
written to Argyll and Bute Council regarding the Proposed Local Development Plan 2, which
is currently at Examination. Due to the status of the revised draft National Planning
Framework 4 the reporters are currently determining what, if any, further processes are
required as a consequence. Although PLDP2 remains a material consideration it is now
subject to this further assessment against NPF4 policies. Therefore, it considered
appropriate not to attach significant weight to PLDP2 policies during this time, i.e. until the
consequences of NPF4 policies for the PLDP2 have been assessed by the reporters and
the Examination report is issued. Specific sites in PLDP2 that have not received
objections and are not being dealt with at the Examination may continue as strong
material considerations, e.g. allocations and potential development areas. 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
The proposal falls within Schedule 2 and is EIA Development. 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No (if Yes provide summary detail of PAC below) 
No the proposal falls within Schedule 2 and is EIA Development.
Page 45

Page 46

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No 
(N) Does the Council have an interest in the site:  ☐Yes ☒No 
(O) Requirement for a pre-determination hearing: ☒Yes ☐No 
In deciding whether to exercise the Council’s discretion to allow
respondents to appear at a discretionary hearing, the following
are of significance:
 How up to date the Development Plan is, the relevance of
the policies to the proposed development and whether the
representations are on development plan policy grounds
which have recently been considered through the
development plan process. 
 The degree of local interest and controversy on material
considerations together with the relative size of community
affected set against the relative number of
representations, and their provenance. 
The current Local Development Plan was approved in 2015. 
NPF4 which was approved this year contains a similar criteria
based approach in relation to aquaculture applications.  It is
considered that the development plan is up to date.
At the time of writing this application has attracted 232
objections, 2 representations and 45 expressions of support. 
Objection has been raised by the Argyll District Salmon Fishery
Board and Tarbert and Skipness Community Council in their
capacity as a statutory consultees. Fisheries Management
Scotland and the Clyde Fishermen’s Association were also
consulted and have objected.  Given the level of interest in the
application and the complexity of the issues raised, it is
considered that there would be merit in holding a pre-
determination Hearing to allow Members consider the site,
question participants and consider the arguments on both
sides in more detail.  It is the view of officers that this would
add value to the decision-making process. 
(P)(i) Key Constraints/Designations Affected by the Development:
 Ailsa Craig SPA
 Endrick Water SAC 
Page 46

Page 47

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(P)(ii) Soils
Agricultural Land Classification:  N/A
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: N/A  
Does the development relate to croft land? N/A
Would the development restrict access to croft
or better quality agricultural land?
N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
N/A 
Does the proposal include any replacement or
compensatory planting?
N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
N/A 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 (tick all relevant boxes)
N/A
ABC LDP 2015 Allocations/PDAs/AFAs etc: N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
This planning application is for the siting and operation of a new salmon fish
farm.  The site is located within the Kilbrannan Sound 800m north of Cour Bay
and 1km south of Crossaig.  The fish farm would comprise of twelve, 120 metre
circumference pens in a 2 x 6 grid.  A feed barge is also proposed which would
be located in the middle of the grid.  The site would be service by sea from the
existing shore base a Carradale Harbour. 
This proposal is EIA Development and the determination of this application is
also subject to the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017.  There is a requirement to examine
the environmental information submitted and reach a reasoned conclusion on the
significant environmental effects of the proposal.  In this respect the following
have been taken into account when reaching a recommendation: 
The EIAR (2020) report and appendices submitted on 29/7/20;
The EIAR Addendum:  Human Health, dated December 2021;
The Environmental Management Plan dated December 2020;
The consultation responses from Marine Scotland Science, NatureScot, SEPA,
Argyll District Salmon Fishery Board, Historic Environment Scotland, Northern
Lighthouse Board, West Highland Anchorages and Moorings Association, Clyde
Fishermen’s Association, Fisheries Management Scotland, Royal Yachting
Association, North Ayrshire Council, NHS Highland, East Kintyre Community
Council, Tarbert and Skipness Community Council, Argyll and Bute
Page 47

Page 48

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Environmental Health, Argyll and Bute Local Biodiversity Officer and Argyll and
Bute Marine and Coastal Development Policy Officer;
Representations received. 
The recommendation on this application has been guided by the conclusions of
the EIAR and the proposal has been assessed against the polies of the adopted
Development Plan with particular regard to the policies of NPF4 and to the
criteria based approach of the aquaculture supplementary guidance policy AQUA
1 as well as other material considerations and policies within the plan. 
The main determining issues in the assessment of this application are seascape,
landscape and visual issues, effects on the setting of Cour House, effects on
priority habitats and species including internationally designated sites, wild fish
interactions including sea lice and containment, implications for commercial and
recreational marine activity, general amenity issues and economic impact. 
The issues relating to this application have taken a long time to resolve, primarily
due to delays incurred in relation to concerns raised associated with the impacts
of fish farm bath medications and the effects on human health on those entering
the water especially in relation to wild swimming. 
The Scottish Salmon Producer’s Organisation (now Salmond Scotland), a body
that represents companies farming salmon in Scotland, commissioned a report to
investigate this issue.  A large part of the delay was incurred in relation to the
time taken to produce this report and for the planning authority to receive a
consultation response from NHS Highland. 
A large number of representations have been received (at the time of writing 232
objections, 45 support and 2 representations) and there have also been
objections from consultees. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan and there are no other material considerations of sufficient
significant to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No (If yes provide detail below)   
Page 48

Page 49

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Author of Report: Sandra Davies Date: 09/05/2023 
Reviewing Officer: Peter Bain Date: 12/05/2023 
Fergus Murray
Head of Development & Economic Growth 
Page 49

Page 50

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 20/01345/MFF 
Standard Time Limit Condition  (as defined by Regulation) 
Additional Conditions  
1. The development shall be implemented in accordance with the details specified on
the application form dated 29/7/20, the Environmental Impact Assessment Report
dated 2020 (and subsequent addendum); and, the approved drawings listed in the
table below unless the prior written approval of the planning authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997 (as amended). 
The developer and subsequent operator(s) shall at all times construct and operate
the development hereby permitted in accordance with the provisions of the
Environmental Statement accompanying the application with mitigation measures
adhered to in full, and shall omit no part of the operations provided for by the
permission except with the prior written approval of the Planning Authority. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1 of 12 - 25/8/20
Supplementary
Location Plan
2 of 12 - 25/8/20
Site Coordinates 3 of 12 - 12/8/20
Plans and
Elevations
Typical Pen
Design Top Net
Support
4 of 12 - 12/8/20
Feed Barge 5 of 12 - 25/8/20
Underwater
Lighting
Technical Sheet
6 of 12 - 25/8/20
Plans and
Elevations
Typical Net
Design
7 of 12 - 12/8/20
Plans and
Elevations
Typical Mooring
Design
8 of 12 - 12/8/20
Plans and
Elevations -
Proposed Site
Configuration
9 of 12 - 12/8/20
Plans and
Elevations
10 of 12  12/8/20
Page 50

Page 51

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Typical Pen
Design
Admiralty Chart
Extract
11 of 12  25/8/20
Site Plan 12 of 12  25/8/20 
Reason: For the purpose of clarity, to ensure that the development is constructed and
operated in the manner advanced in the Environmental Impact Assessment Report,
upon which the environmental effects of the development have been assessed and
determined to be acceptable. 
2. The development hereby approved shall not be operated other than with a biomass of
2475.54 tonnes or less. 
Reason:  The environmental effects of this proposal have been assessed against this
maximum biomass.  
3. Notwithstanding the details given in the Predator Mitigation Plan, no Acoustic
Deterrent Devices (ADDs) shall be deployed at the site hereby approved. 
Reason:  In the interests of nature conservation.  This planning application has been
determined on the basis that ADDs will not be used. The use of ADDs would be
regarded as a material change to the proposal. 
4. The site shall not be stocked until the wild fish monitoring plan has been agreed which
shall include a requirement to monitor the juvenile salmon population in coastal waters
within a zone of 30km from the Management Area. 
Reason: In the interests of nature conservation. 
5. As part of the end of cycle review, to be undertaken no later than 6 weeks prior to the
end of the growth cycle, the site shall not be restocked until the review has been
agreed by Argyll and Bute Council in consultation with NatureScot. 
Reason:  In the interests of nature conservation. 
6. There shall be no use of drift nets, vertical static nets or gill nets to recapture escaped
fish. 
Reason: In order to avoid putting marine birds, including guillemots, shags, divers and
others at risk. 
7. The pole mounted top net system hereby approved shall be as noted below unless
otherwise agreed in writing with the planning authority in consultation with NatureScot: 
Height (m)
Perimeter Pole Support Maximum height of 5m above the water
surface 
Mesh Size (mm)
Sidewall netting from the bottom to 2m
height
25
Page 51

Page 52

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Ceiling net panel and remaining sidewall
netting
100
Colour Dark grey to black 
This shall be subject to review, underpinned by systematic monitoring.  The Planning
Authority shall be immediately notified in the event of emergence of patterns of
entanglement or entrapment of marine birds. 
Reason:  To minimise the risk to all bird species and to ensure that there are no
significant effects on the qualifying interests of the Ailsa Craig Special Protection Area.   
8. The proposal shall be undertaken strictly in accordance with the following criteria:
(a) Operators shall maintain daily records of wildlife entanglement / entrapment
using a standardised proforma which shall be submitted to the planning authority and
copied to NatureScot at 6 monthly intervals or other specified period to be agreed in
writing with the planning authority in consultation with NatureScot. The first proforma
shall be submitted 6 months after the development is brought into use unless
otherwise agreed in writing with the planning authority in consultation with
NatureScot. 
(b) In the event of any significant entrapment or entanglement of gannets, and
any other SPA interests identified as relevant to a particular fish farm (e.g involving
three or more birds of any named species in any one day and / or a total of ten or
more birds in the space of any seven day period and / or repeat incidents involving
one or more birds on four or more consecutive days), the operators shall immediately
notify both the planning authority and NatureScot; 
(c) Adaptive management approaches should be agreed in writing with the
planning authority in consultation with NatureScot in advance of these being
implemented. 
Reason:  In order to ensure that there are no significant effects on the qualifying
interests of the Ailsa Craig Special Protection Area.  Gannet have an extensive
range and would have the potential to become entangled in nets. 
9. The site shall be operated, monitored and managed in accordance with the
Kilbrannan Sound Environmental Management Plan (EMP) attached to the planning
portal on 22 December 2022 and subsequent approved variation thereof.  The EMP
should be reviewed and updated if required following the adoption by Scottish
Government of any new policy framework relevant to wild salmonid interactions. Any
proposed amendments to the EMP shall be submitted to and approved in writing by
the planning authority prior to the changes being implemented. 
Reason: In the interests of nature conservation. 
10. The site shall be operated in accordance with the North Kilbrannan Sea Lice
Management and Efficacy Report dated 2020 or any subsequent updates of this
document which shall be submitted to and approved in writing by the planning
authority. 
Reason: In the interests of nature conservation. 
Page 52

Page 53

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
11. The site shall be operated in accordance with the North Kilbrannan Containment and
Escapes Contingency Plan dated 2020 and the North Kilbrannan Inspection and
Maintenance Schedule with the exception of any proposed actions contained within
these documents limited by other conditions on this planning permission.  Any
subsequent updates of these documents shall be submitted to and approved in
writing by the planning authority. 
Reason: In order to minimise the risk of escapes in the interests of nature
conservation. 
12. In the event that the development or any associated equipment approved by this
permission ceases to be in operational use for a period exceeding three years, the
equipment shall be wholly removed from the site thereafter, unless otherwise agreed
in writing by the Planning Authority. 
Reason: In the interest of visual amenity and to ensure that redundant development
does not sterilise capacity for future development within the same water body. 
13. The finished surfaces of all equipment above the water surface, excluding the feed
barge, but inclusive of the surface floats and buoys associated with the development
hereby permitted (excluding those required to comply with navigational
requirements) shall be non-reflective and finished in a dark recessive colour in
accordance with the details provided in the EIAR unless otherwise agreed in
advance in writing by the planning authority.   
Reason: In the interest of visual amenity. 
14. All lighting above the water surface and not required for safe navigation purposes
should be directed downwards by shielding and be extinguished when not required
for the purpose for which it is installed on the site. 
Reason: In the interest of visual amenity. 
15. Prior to the commencement of development a further Waste Management Plan
shall be submitted to and approved in writing by the planning authority. This shall
include details of the arrangements for the storage, separation, and collection of
waste from the site including proposals for uplift from areas where fish farm
equipment has become detached from the site. 
Reason: To ensure that waste is managed in an acceptable manner. 
16. Prior to the commencement of development, a communications and monitoring plan
in relation to the use of bath medications shall be submitted to and approved in writing
by the Planning Authority.  This shall detail the method by which other marine uses
shall be informed of general safety information that should be considered by water
user when in the vicinity of the farm, including when bath medications are being
actively use at the site.  Thereafter the development shall be carried out wholly in
accordance with the Communications and Monitoring Plan unless otherwise agreed,
or varied, in writing with the Planning Authority. 
The Communications and Monitoring Plan shall include: 
a.  A Communications Plan detailing the method by which other marine users
Page 53

Page 54

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
shall be informed of general safety information that should be considered by water
users when in the vicinity of the fish farm, including when bath medications are being
actively used at the site.  The Communications Plan shall be informed  by the
conclusions of the supporting information “Assessment of Potential Risk to Human
Health Following Use of Azamethiphos, Deltamethrin and Hydrogen Peroxide; WCA;
Dec 2021”,
b. A Monitoring Plan to investigate the dispersal and dilution of Hydrogen
Peroxide following its use in bath treatments on the site and the use of these findings
to review and update the conclusions in the aforementioned supporting information,
and the Communications Plan.  The Monitoring Plan shall include provision for
reporting the findings to the Planning Authority and securing its written approval for
any resultant amendment that may be proposed to the Communications Plan. 
Reason: In order to inform marine users of potential risks to human health in the
vicinity of the fish farm. 
17. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended water supply and system required to serve the
development has been submitted to and approved by the Planning Authority. 
Reason: In the interests of public health and in order to ensure that an adequate water
supply in terms of both wholesomeness and sufficiency can be provided to meet the
requirements of the proposed development and without compromising the interests
of other users. 
18. The Noise Rating Level attributable to the operation of the approved fish farm
operation shall not exceed background noise levels by more than 3dB(A) at any
residential property measured and assessed in accordance with BS4142:2014.   
Reason: In order to protect the amenities of the area from noise nuisance 
NOTE TO APPLICANT 
 The use of sub-sea anti-predator nets requires consent from NatureScot. 
 The applicant shall make the following commitments to SSEN as detailed in MOWI’s
letter of 12/11/20 Scottish Hydro Electric Transmission plc in relation to their sub sea
cable. 
 The Aquatic Animal Health (Scotland) Regulations 2009 requires the authorisation of all
Aquaculture Production Businesses (APBs) in relation to animal health requirements for
aquaculture animals and products thereof, and on the prevention and control of certain
diseases in aquatic animals.  The authorisation procedure is undertaken on behalf of
the Scottish Ministers by the Fish Health Inspectorate (FHI) at Marine Scotland Marine
Laboratory.   To apply for authorisation for an APB or to amend details of an existing
APB or any site that an APB is authorised to operate at, you are advised to contact the
FHI as follows:  Fish Health Inspectorate, Marine Scotland Marine Laboratory, 375
Victoria Road, Aberdeen AB11 9DB Tel: 0131 244 3498; Email: ms.fishhealth@gov.scot 
 All marine farms, whether finfish, shellfish or algal, are required to apply for a marine
licence under Part 4 of the Marine (Scotland) Act 2010. To apply for a marine licence,
Page 54

Page 55

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
or to amend details of an existing marine licence (formally Coast Protection Act 1949 –
Section 34 consent), please visit the Scottish Government’s website at
http://www.gov.scot/Topics/marine/Licensing/marine/Applications where application
forms and guidance can be found.  Alternatively you can contact the Marine Scotland
Licensing Operations Team (MS-LOT) by emailing MS.MarineLicensing@gov.scot; or
calling 0300 244 5046. 
 The Northern Lighthouse Board has recommended the following:
The site should be marked with 2 lit yellow poles fitted with yellow “x” topmarks;
The lights should display a character of flash  one yellow every five seconds (Fl Y 5s)
with a nominal range of 2 nautical miles and be installed above the “x” topmark.
The poles should be positioned at the Northwestern and Northeastern seaward
corners of the cage group.
Each light should be 1 metre above the site equipment handrails and installed to be
clearly seen by vessels approaching from all navigable directions.
Poles should be greater than or equal to 75mm diameter, the “x” topmark should be
greater than or equal to 75cm length by 15 cm width.
The feed barge should exhibit an all-round fixed white light with a nominal range of 2
nautical miles from a point at least 1 metre above any other obstruction.
A weekly check of the site’s marking equipment shall be performed, and records kept
of its physical and working status for audit purposes.
outlying anchor points should not be marked with buoys, unless specifically requested
by local users, and alternative means to locate anchors should be utilised.
Loose floating lines around site equipment are strongly discouraged as this can cause
serious safety implications for other mariners.
Upon completion of the works, ‘as-built’ plans should be provided to the UK
Hydrographic Office to enable the update of navigational publications. 
 In the event of an escape, the company should liaise with Argyll and Bute Council’s
Environmental Health service. 
Page 55

Page 56

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  20/01345/MFF 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
The proposed fish farm is located in the Kilbrannan Sound at a distance of c.175m from
the shoreline, 11km to the north of Carradale, 800m north of Cour Bay and approximately
1km south of Crossaig. The proposal would comprise 12 no. 120m circumference pens
arranged in a 2 x 6 grid supported by a 75m mooring matrix and a feed barge (450 tonnes). 
The feed barge would be located at the middle of the grid between the pens and the land. 
The submerged nets will be 12 metres deep and the pole supported top nets will be 5-5
metres high.  The site would be serviced from the existing shore base at Carradale. 
2. Planning Policy 
The Development Plan for the determination of this planning application comprises
National Planning Framework 4 (NPF4), adopted February 2023, and the Argyll and Bute
Local Development Plan, adopted 2015.  NPF4 is based around six overarching spatial
principles which the proposed development should align with.  These are: 
 Just transition;
 Conserving and recycling assets; 
 Local living;
 Compact urban growth;
 Rebalanced development;
 Rural revitalisation. 
Not all of these principles will be relevant to every development and in relation to the
current proposal it is considered that just transition, rural revitalisation, local living and
rebalanced development would apply.  In terms of rural revitalisation, NPF4 supports
development that helps retain and increase the population of rural areas in Scotland. 
The following NPF 4 polices are considered relevant to the proposal: 
Policy 1 – Tackling the Climate and Nature Crises – This policy requires significant weight
to be given to the global climate and nature crises. 
Policy 2 – Climate Mitigation and Adaptation – This policy aims to promote and facilitate
development that minimises emissions and adapts to climate change. 
Policy 3 – Biodiversity – This policy seeks to protect biodiversity, reverse biodiversity loss,
deliver positive effects from development and strengthen nature networks through nature
based solutions.  NPF 4 explicitly advises that part (b) and (c) of this policy do not apply
to aquaculture developments. 
Policy 4 – Natural Places – This policy aims to protect, restore and enhance natural assets
making best use of nature based solutions. 
Policy 7 – Historic Assets and Places – This policy seeks to protect historic environment
assets and places/
Page 56

Page 57

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Policy 12 – Zero Waste – This policy encourages, promotes and facilitates development
that is consistent with the waste hierarchy. 
Policy 23 – Health and Safety – This policy seeks to protect people and places from
environmental harm, mitigate risks arising from safety hazards and encourage, promote
and facilitate development that improves health and wellbeing.   
Policy 25 – Community Wealth Building – This policy seek to encourage, promote and
facilitate a new strategic approach to economic development that also provides a practical
model for building a wellbeing economy at local, regional and national levels. 
Policy 29 – Rural Development – This policy encourages rural economic activity,
innovation and diversification whilst ensuring that the distinctive character of the rural area
and the service function of small towns, natural assets and cultural heritage are
safeguarded and enhanced. 
NPF4 also contains 33 policies a number of which will apply to marine fish farms, however, 
prime policy for aquaculture is Policy 32.  This policy seeks to “encourage, promote and
facilitate aquaculture development and minimise any adverse effects on the environment
including adverse impacts”.  This policy seeks to achieve new aquaculture development
in locations that reflect industry needs and considers environmental impacts, producers
who contribute to communities and local economies, prosperous finfish, shellfish and
seaweed sectors while safeguarding migratory fish species. 
In order to safeguard migratory fish species, this policy does not support further salmon
and trout open pen fish farms on the north and east coasts of mainland Scotland.  The
policy also requires proposal to accord with the LDP, National Marine Plan and where
relevant the Regional Marine Plan.  The policy then goes on to define the operational
impacts which require consideration along with potential impacts which need to be
assessed and mitigated. 
Policy 32 also clarifies that where open water farmed finfish are being considered the
requirements of policy 3b and 3c are not required and instead the relevant provisions from
the National and Regional Marine Plans should apply.   Policy 32 requires the
consideration of a set of criteria which are similar to those covered the LDP aquaculture
policy. These criteria are considered in full below under the Council’s LDP aquaculture
policy. 
Policy 1 (Sustainable Places) of NPF4 requires that when considering development
proposals significant weight is given to the global climate and nature crises.  The EIAR
supporting this application considered the environmental consequences of this proposal
and concludes that the proposed development at the scale proposed could operate with a
minimal negative impact on the environment subject to the adoption of identified mitigation. 
The proposal benefits from general support from the Scottish Government’s National
Marine Plan and from NPF4 which together recognise the contribution of the aquaculture
sector to the rural economy and which seek to support sustainable economic development.
The National Marine Plan and NPF4 both support marine fish farming where it can take
place in environmentally sustainable locations, where it does not exceed the carrying
capacity of the water body within which it is to be located, and where it does not give rise
to significant adverse effects upon nature conservation, wild fish, historic environment or
other commercial or recreational water users. 
Page 57

Page 58

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
LDP Supplementary guidance SG LDP AQUA 1 – Aquaculture Development provides a
general framework against which fish farm applications should be considered, along with
other relevant LDP policy and SG. 
The following Local Development Plan provisions are applicable to this development: 
Policy LDP STRAT 1 – Sustainable Development supports the presumption in favour of
sustainable economic development established by Scottish Planning policy and lends
weight to aquaculture developments unless there are environmental considerations which
outweigh this presumption. 
Policy LDP DM 1 – Development within the Development Management Zones – Land
adjacent to the site is designated as ‘countryside’ zone. 
Policy LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment – seeks to control development in a manner which protects, conserves or
where possible enhances the built, human and natural environment. 
Policy LDP 5 – Supporting the Sustainable Growth of Our Economy – requires regard to
be had to economic benefit and the spatial needs and locational requirements of business
sectors. 
Policy LDP 9 – Development Setting, Layout and Design – requires that regard should be
had to the setting of developments, the sensitivity of the receiving environment and the
need to secure appropriate forms of scale, design and appearance.
Supplementary Guidance SG LDP AQUA 1 – Aquaculture Development stems from 
Policy LDP 5 which identifies aquaculture as a key economic sector in Argyll & Bute.  It
sets out criteria against which the locational and operational characteristics of a
development require to be assessed. Proposals are to be supported if direct, indirect or
cumulative significant effects are avoided, or adverse effects can be minimised or
mitigated by operational measures. 
Whilst not part of the Development Plan, the Council as a public body is required to take
authorisation decisions in accordance with the National Marine Plan (NMP) as the
proposal extends into the marine environment, unless relevant considerations indicate
otherwise.  The proposal should be consistent with general policies of the NMP including: 
GEN 1 – General planning principle;
GEN2 – Economic benefit;
GEN 3 – Social benefit;
GEN 4 – Co-existence – requires consideration that may occur and the likely effect of
interaction between inshore commercial fisheries (loss of fishing ground) and marine and
coastal recreational activities.
GEN 5 Climate change;
GEN7 – Landscape/seascape;
GEN 9 – Natural Heritage
GEN 10 – Invasive non-native species;
GEN 11 – Marine Litter;
GEN 12 – Water Quality and Resource;
GEN 13 – Noise. 
Page 58

Page 59

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
NPF4 Policy 32 refers the National and Regional Marine Plan and notes that proposals
will be supported where they comply with the relevant plans.  The criteria noted within the
NMP policies above are also covered within the Development Plan policies. 
Beyond development plan considerations, in determining the application regard has to be
had to the Council’s’ Economic Development Action Plan which identifies aquaculture as
an important contributor to the local economy, and to national government economic and
sectoral policy, the stated intention of which is to seek to expand the finfish sector
substantially to meet internal and export demands and to help sustain direct and indirect
employment in rural areas.  In addition, one of the proposals contained within the Rural
Growth Deal for Argyll and Bute relates to a vision for Argyll and Bute to be the leading
region for innovation in marine aquaculture in Scotland, UK and globally, by underpinning
sustainable, inclusive business growth through investment in world class marine science
and technology.  This includes a commitment to a Marine Industry Needs Assessment.
This study will provide the evidence base for industry needs to inform future investment
outcomes and the potential options available to deliver these outcomes. This will assist in
identifying the key priorities for Rural Growth Deal investment and where this should be
targeted to support sustainable growth of this sector and set out in the business case for
consideration and approval by SG. 
3. Assessment Against Policy Criteria 
Assessment of the proposal in this case will primarily be against the criteria set out in
sector specific policies of NPF 4 Policy 32 and SG LDP AQUA1 and other relevant
Development Plan policies. There is a requirement to consider the locational and
operational characteristics of the development against each of the specified criteria with
the presumption that proposals will be supported where: 
- Direct, indirect or cumulative significant adverse effects on the criteria are
avoided in relation to the locational characteristics of the development (this would be
relevant in this case in terms of the impact of the development upon nature
conservation designations, for example); 
- The applicant can demonstrate that the level of risk of potential impacts on
criteria relating to the operation of the site can be effectively minimised or mitigated
by appropriate operational measures (this would be relevant in this case to the impact
of the operation of the development upon wild fish interests); 
- Proposals are consistent with other local and national policies and guidance 
The eight development criteria set out in SG LDP AQUA 1 which align with the
requirements of NPF4 Policy 32 are reviewed in the sections below along with the
consideration of other relevant policies contained within the development plan. 
1) Landscape / Seascape and Visual Amenity 
An LVIA has been included within the EIAR.  The proposal would introduce a new fish
farm in a new location and the implementation of this development may have landscape
and visual effects.  The LVIA notes that the key issues which could arise from the
development include:
Page 59

Page 60

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
 Potential effects on the landscape and seascape character of the Cour, Crossaig and
Claonaig areas, as well as the landscape and seascape character of the Arran
coastline opposite, from Pirnmill to Lochranza;
 Potential effects on the North Arran NSA;
 Potential effects upon the Arran Northern Mountains SSSI;
 Potential effects on nearby settlements and views from habitation;
 Potential effects on views from passing craft within Kilbrannan Sound;
 Potential effects on existing recreation trails and routes passing alongside and in
proximity to the coastline both on Kintyre and along the Arran coast;
 Potential compliance, in terms of Landscape and Visual impact, with national, regional
and local planning policy as interpreted by the ABC Local Plan and Scotland’s National
Marine Plan;
 Potential for cumulative impacts with other development and land management in the
area. 
The development would be located off the east side of the Kintyre peninsula which in
landscape terms is characterised within “Landscape Assessment of Argyll and Firth of
Clyde” (SNH 1996) as being large scale mosaic of moorland and forestry plantation”, with
the character of the coastal fringe becoming more intricate and smaller scale with a variety
of distinct character areas defined by undulating topography and crenulated coastline.  To
the ease the narrowing of the Kilbrannan Sound and views towards Ailsa Craig are
defining landscape features. 
The proposed fish farm would be located off a small promontory named Rubha Riabhach
which is located beyond a rocky shoreline.  The site is theoretically visible to a wide extent
from both the north and the south with the views to west curtailed by the promontory. 
There are clear views from the Kilbrannan Sound and distant views from the Isle of Arran. 
The EIAR notes that the location of Rubha Riabhach is remote from residential properties
and outwith sightlines of adjacent Crossaig and Cour.  It is further notes that the coastline
of Arran is sufficiently far away to diminish views. 
The B842 runs north from Campbeltown to Cloanaig.  This is a single track road which
moves in and out from the coastline due to topography.  In places there are elevated
views across the Kilbrannan Sound toward Arran and Ailsa Craig.  The road is also
designated as long distance cycle path (NCN 78) and core path. The closest dwellings to
the proposed fish farm can be found at Cour and Crossaig at distances between 1km and
1.5km. 
The site is not located close to or within any landscape designations on the Kintyre side,
however, the site lies opposite the North Arran National Scenic Area designated for the
scenic quality of the dramatic peaks and its contribution to the landscape setting of the
Firth of Clyde and scenic enjoyment of Kintyre.  In terms of the adopted Local Plan, the
land which would run parallel to the fish farm is designated as countryside.
The EIAR notes that the land and shore in the vicinity of the fish farm does not lend itself
to recreational access.  There is not promoted access and the shoreline is rocky.  The
long distance cycle route and core path is set further back at this point with potential views
from the north and south approaches.   
In terms of landscape impact, five key Landscape, Coastal and Seascape Character
Areas with intervisibility to the proposed site, and as identified within the Seascape /
Landscape Character Assessment for the Firth of Clyde, the SNH Landscape Character
Assessment and key SNH aquaculture guidance, have been used as landscape
receptors. 
Page 60

Page 61

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The SLVIA notes that the key seascape and landscape characteristics of the area are the
remote and indented coastline, the narrowing of the Kilbrannan Sound and proximity to
Arran, where the low hills of Kintyre contrast with the drama of the rugged Arran skyline.
The gentle landscape of the area and clustered settlement pattern, with strong links to the
sound and rich historical influence, create a landscape with unique character and
attraction. The section of coast within the locality contains relatively fewer landscape
features than surrounding coastline, with existing industrial infrastructure which impacts
upon the positive character of the area. 
To aid the evaluation of visual effects, fourteen viewpoints were selected as part of the
SLVIA.  These are noted below along with their sensitivity and the level of significance: 
Viewpoint Sensitivity Level of Significance
1. Grogport Old Manse
Dun – Scheduled
Ancient Monument
(SAM) 
High Negligible
2. B842: south;  High Moderate to Major
3. Cour House
(category A listed); 
Moderate to High Moderate
4. B842: adjacent Moderate to High With woodland screening
No Effect, Moderate to
Major with woodland
removed.
5. B842: north;  High Moderate
6. Claonaig slipway;  High Negligible
7. Claonaig to
Lochranza ferry
crossing; 
High Negligible
8. Kilbrannan Sound
north; 
Moderate to High Moderate to Major
9. Kilbrannan Sound
south; 
Moderate to High Moderate to Major
10. Pirnmill Former Free
Church beachfront; 
High Negligible
11. Thundergay beach;  High Moderate
12. Core Path AR81
Coirein Lochan; 
High  Moderate
13. Catacol;  High Negligible
Page 61

Page 62

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
14. Newton Point
Viewpoint. 
High Negligible on clear and still
days with potentially No
Effect at other times. 
The visual effect of the proposal range between No Effect and Moderate to Major.  The SLVIA
concludes that the most significant visual effects were views from the B842 /NCN Cycle Route
78 / Core Path Campbeltown to Claonaig.  Here there were Moderate to Major levels of
significance due to the high sensitivity of the viewpoints and the scale of the proposal within
the view albeit a passing view on a recreational route. 
Viewpoint 4 was assessed as having No Effect prior to intervening forestry being felled.  As
this forestry has now been felled there will be clear views of the site from this viewpoint.  As a
result of the felling the applicant’s landscape consultant has provided further clarification on
this viewpoint.  It is noted that this is not a promoted view and it would be experienced both
as a passing view and somewhere where people will stop on an informal basis by car or as a
rest point for cyclists and walkers.  The view which would contain the fish farm cages would
be part of a much larger panorama, the majority of which would remain unaffected.  The
applicant’s landscape consultant considers that the removal of the conifer plantation would
not change the character assessment or the overall determination of the SLVIA. 
The SLVIA has also considered potential cumulative effects with the proposed High
Constellation wind farm.  This site boundary of the windfarm is located 0.8km to the east of
the proposed wind farm and 3.2km to the nearest turbine. Limited intervisibility and presence
of existing similar infrastructure between the two developments resulted in a determination of
no cumulative seascape and landscape effects, but with potential for cumulative effects during
construction phases. 
Overall the SLVIA report concludes that 
“the area of proposed development is within an attractive landscape and seascape area, but
with detracting factors which lower sensitivity and enable the development of proposals to be
undertaken without major adverse effects being encountered. There are key areas of
recreational resource, and hotspots of high sensitivity along the Kintyre coast, and within these
areas there are higher levels of impact determined, but this is well contained to minimise
overall levels of significance. The siting of the proposed fish farm is appropriate to context,
maintaining integrity of the key characteristics of the area to sufficient levels. The highly
sensitive coastline of north Arran is protected from unduly high levels of adverse effects, with
sufficient distance across the Sound and sufficient interest and engagement within the wider
landscape and seascape. 
This SLVIA concludes that, with adherence to mitigation, the proposals conform to the Argyll
and Bute Local Development Plan and to wider marine planning guidance, with a good
proportion of acceptable levels of impacts within the Cour area.” 
Officers would concur with this view and consider that the seascape, landscape and visual
impacts of the proposal would be acceptable in terms of NPF4 policies 4 and 32 and LDP
policies AQUA 1, LDP 3, SG LDP ENV 12 and SG ENV 14. 
2) Isolated Coast and Wild Land 
There are no areas of wild land which would be impacted on the proposal.  The proposed fish
farm would be located adjacent to land designated as countryside and therefore not adjacent
to isolated coast.  The proposal does not conflict with the development plan on this issue
including NPF policies 4 and 32. 
Page 62

Page 63

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
3) Historic or Archaeological Sites and their settings 
At the scoping stage of this development Historic Environment Scotland (HES) advised that
there were no heritage assets within their remit located within the site area or its vicinity.  It
was therefore suggested that these issues could be scoped out of the EIAR.  However, the
Council identified that there may be impacts on the category A listed Cour House and that this
should be considered within the EIAR.  The assessment concluded that there were no features
of cultural heritage importance within 2km of the site.  The A listed Cour House is located
approximately 1.6km from the proposed site and the EIAR has concluded that there will only
be a small proportion of the site visible at an oblique view with only a limited change to the
overall view.  It was concluded that this would lead to small adverse effects and moderate
levels of significance.  Due to the location of the farm north of Cour Bay and the screening
provided by the headland of Rubha Riabhach officers would concur with this view and are of
the opinion that the proposal would not have an unacceptable effect on the listed building or
its setting.  This view is supported by the HES consultation response to this application which
advises that due to the limited visibility in views from Cour House, significant impacts on the
setting are unlikely. 
In terms of Policy 7 of NPF4, the proposal would not affect any Historic Marine Protected
Areas. 
Taking account of the above, it is not considered that the expansion of the fish farm in this
location would have an adverse impact on the setting cultural heritage assets and therefore
the proposal would not conflict with NPF4 policies 7 and 32 and LDP policies LDP 3, LDP 5,
SG LDP AQUA 1 and SG LDP ENV 16(a). 
4) Priority Habitats and Species (including wild migratory salmonids) and
designated sites for nature conservation 
NatureScot has advised that the proposal is likely to have significant effect on the qualifying
interests of the Ailsa Craig SPA and Endrick Mouth SAC.  In these circumstances Argyll and
Bute Council, as competent authority, is required to carry out an appropriate assessments in
view of the sites’ conservation objectives for their qualifying interests.  The appropriate
assessments are contained within the appendix of this report.  The conclusions of this are that,
subject to the specified mitigation which are included as proposed conditions, the proposal will
not adversely affect the integrity of the sites.   
With regard to NPF4 – policies 3 and 4 in relation to impacts upon species or habitats of
conservation importance, including sensitive sites, the EIAR concluded that there were no
relevant designations near North Kilbrannan, however, two distant protected areas were
considered relevant, namely Endrick Water SAC and Ailsa Craig SPA.  Both of these sites
have been considered in Appropriate Assessments which are appended to this report. Both of
these conclude that the proposal can proceed subject to identified mitigation. 
The proposal would also be operated in accordance with an Environmental Management Plan
(EMP).  The aim of the EMP is to ensure that salmonid farming activity, within the Management
Area does not result in negative impacts to local salmon and sea trout populations and
fisheries.  Part of this process commits to improving the understanding of the relationship
between farmed salmon production and the health of wild salmonids.  This will include the
monitoring of lice burdens on wild fish and will include an adaptive management process which
takes account of scientific evidence on negative impacts on wild salmonids arising from
farming activity.  In relation to impacts on the SAC, NatureScot have advised that they are
satisfied the planning authority can conclude that appropriate measures are in place to ensure
that the farm will not compromise the conservation objectives of the Endrick Water SAC and
will not therefore result in an adverse effect on site integrity. 
Page 63

Page 64

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
In addition, NatureScot advise that the proposal will not result in any significant impacts on
Priority Marine Features. 
Subject the requirement for mitigation these policies would not conflict with NP4 policies 3, 4
and 32 and LDP policies LDP 3, LDP 5 and SG LDP AQUA 1. 
5) Wild Fish Interactions  
The EIAR advises that there are four main local rivers that hold salmonid populations within
about 15km of the site.  These are Skipness River, Claonaig Water and Carradale Water on
the Kintyre peninsula and Iorsa Water and Machrie Water on the Isle of Arran.  Data shows
there has been a general reduction in salmon and grisle and sea trout catches with time in the
Carradale Statistical District.  In the Iorsa Statistical District any trends with time are less clear. 
It should be noted that the data is affected by a number of factors including the stocking of
salmon in Iorsa Water.  In 2020 Carradale Water, Iorsa Water and Machrie Water, for which
conservation assessments were available, had a salmon conservation grading of 3 meaning
that “exploitation is unsustainable therefore management actions required to reduce
exploitation” requiring mandatory catch and release.  The EIAR further cites the Argyll
Fisheries Trust report, Isle of Arran Rivers Project, Phase 2 of 2: Survey of Fish Populations
and Habitats 2008/2009 which noted that in western Arran catchment rivers (including Iorsa)
salmon fry abundances were generally low.  The conclusion of the report stated that “The
patch distribution of juvenile salmon is likely to be primarily due to population shrinkage as
consequence of low numbers of adult sea returns”.  The EIAR therefore concludes that the
vulnerability of the salmon and sea trout populations in the catchment area classify this
receptor as high sensitivity. 
a) Containment and risk of escapes 
Containment following Carradale Escape 
Following the mass fish farm escape in August 2020 during Storm Ellen, MOWI has advised
that a detailed root cause analysis was carried out which identified and informed a series of
remedial and improvement actions aimed at avoiding future similar events.  The escape was
caused by mooring line failure at the southern end of the pen group.  This was due to abrasion
when the feed barge mooring lines came into contact with pen grid mooring lines.  The actions
identified by MOWI are as follows: 
 A review of moorings analysis procedure and the introduction of an independent third
party verification process;
 Implementation of a programme to strengthen mooring lines at eight of MOWI’s most
exposed fish farms prior to winter 2020;
 Increase in the frequency and intensity of sub surface mooring inspections with the
most exposed farms receiving one ROV survey every 12 months;
 In combination with sub-surface mooring inspections MOWI have, at their most
exposed farming locations, increased the frequency and intensity of physical moorings
inspection pre- and post-winter, carried out by specialist moorings support vessels and
staff;
 Net and weighting system design at high energy farms has been improved and phased
implementation has begun; and
 Development of a dedicated equipment management system allowing a full overview
of technical equipment, site maintenance scheduling and servicing is progressing and
will be rolled out in due course. 
Page 64

Page 65

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
North Kilbrannan would be the first new MOWI fish farm to be subject to these procedures and
supporting documents have been submitted covering these issues.  A condition is proposed
which requires the fish farm to adhere to these requirements. 
Assessment of the Effects of the Escape on Wild Salmon Populations 
Following the escape of salmon from Mowi Scotland’s Carradale North fish farm, Fisheries
Management Scotland, alongside Marine Scotland and funded by Mowi, established an
investigation and monitoring study to assess the effects of the escape on wild salmon
populations.  The first phase confirmed that 277 Atlantic salmon of farmed origin (verified
through scale reading) were caught in 17 rivers across Scotland and North-West England
during the autumn of 2020. The second phase, outlined in a report published by Marine
Scotland in December 2022, involved a genetic study of juvenile salmon obtained from rivers
in areas of Scotland and England local to where escaped farm raised salmon were caught.
The results indicated that hybridisation of farmed and wild salmon following the escape
incident in August 2020 was limited to a single juvenile salmon from a total 5,281 wild fish
sampled and analysed. Although the single salmon was found to contain aquaculture-derived
ancestry, it could not be definitively traced to the escaped fish from the Carradale fish farm. 
b) Sea Lice Management 
Sea lice are ectoparasites belonging to the crustacean family. They have a complex life history
involving a free swimming stage searching for a host.  During subsequent growth phases, they
can move around the host and swim unanchored from it.  Two species can infect salmon; a
salmon specific species (Lepeophtheirus salmonis) and to a lesser extent a more generalist
species (Caligus elongates).  The intensity of infection at which sea lice become damaging
depends upon the size of fish, the species of sea louse and the residence time of lice to the
host. 
MSS advise that scientific evidence from Norway and Ireland indicates a detrimental effect of
sea lice on wild salmonid populations.  As fish farms result in elevated numbers of sea lice in
open water and therefore in some circumstances they are likely to have an adverse effect on
some populations of wild salmonids, however the magnitude of any such impact in relation to
overall mortality is not known.  Information from the west coast of Scotland suggests lice from
fish farming can cause a risk to local salmon and sea trout.  This information can be used to
give an idea of the relative risk to salmon and sea trout which is governed, and can be
mitigated by a number of factors, in particular the siting of the farm and its ability to effectively
control sea lice. 
This development has the potential to increase the risks to wild salmonids. 
The applicant is aware of these risks and has provided information on the sea lice
management strategy used by the company.  The location lies outwith the current Farm
Management Area (FMA) FMA M-47, but it is expected that this will be extended northwards. 
The applicant has advised that the three sites will be operated synchronously being stocked
at the same time with the same year class of fish and observing a synchronous fallow period. 
The EIAR contains a chapter in Interactions with Wild Salmonids and Annex 11 contains a
Sea Lice Management and Efficacy Statement.  The company operates an intervention level
of 0.5 adult female lice all year round where cleaner fish are stocked which is more stringent
than the Code of Good Practice (CoGP) for fin fish aquaculture.  A switch has also been made
from average counts across the farm and treatment of the whole farm to a focus on cage by
cage interventions at an earlier stage. 
Non medicinal methods of controlling sea lice are now favoured with cleaner fish having been
used at the Carradale sites since 2018.  Physical removal methods using hydrolicers and
Page 65

Page 66

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
thermolicer are also available with several of each system being owner by the company.  The
company is also able to use freshwater treatments. 
The company would also have access to medications for use as bath treatments. 
In a consultation response in Aril 2023, Marine Scotland Science advised that in the most
recent production cycle within the Farm Management Area, numbers of adult female sea lice
at the applicant’s nearby Carradale site had remained below Marine Scotland’s reporting
levels since stocking in October 2021.  Towards the end of the production cycle sea lice levels
have risen above the CoGP suggested criteria intermittently. 
Wild salmon and trout are priority marine features, and having regard to the division of
regulatory responsibilities acknowledged in the National Marine Plan, and as part of its
biodiversity duty, the Council in its capacity as Planning Authority must assume responsibility
for the consideration of the implications of aquaculture development for the conservation of
these species. In considering aquaculture applications, the Council therefore has to satisfy
itself that there is both an effective and a consentable sea lice strategy identified, and that
there are controls in place to ensure that necessary steps are taken in the event that sea lice
levels prove not to be capable of being controlled in a satisfactory manner using the measures
identified at the application stage.  SEPA are currently in the process of devising a framework
which will regulate wild fish interactions but until such time as this is implemented, the planning
authority will continue to have responsibility for this issue. 
Marine Scotland’s Fish Health Inspectorate have the responsibility for regulating the health of
fish being produced on the farm, but this responsibility does not extend to the consideration of
the effects of fish farming upon wild fish; although Marine Scotland does provide wild fish
interaction advice to the Council to inform decision-making. SEPA are the regulatory body
responsible for licensing biomass permitted to be held on farms and for the permitted use of
chemicals, but the propagation of sea lice into the wider environment from within farms is not
currently considered as part of their licensing process. 
Marine Scotland’s Impacts of lice from fish farms on wild Scottish sea trout and salmon:
summary of science, last updated 12 March 2021states that “In view of uncertainties in
available information, it is not a straightforward task to ascribe impact from a single farm to a
specific wild salmonid population. When mitigating the risk posed to wild salmon and sea trout
from sea lice emanating from salmon farms, an approach is needed that relates control of lice
numbers on farms within a specified area to measured lice levels in the environment and
estimation of associated risk. Such adaptive management is a useful approach where
sustainable development of aquaculture is required.” 
In addition to the operation of a Sea Lice Management and Efficacy Statement, the applicant
will be required to operate the development in accordance with an Environmental
Management Plan (EMP).  Prior to SEPA taking over the responsibility for regulating this area,
this is currently the method by which sea lice are monitored and controlled in the interests of
wild salmonids.  The aim of the EMP is to ensure that salmonid farming activity within the
Management Area does not result in negative impacts to local salmon and sea trout
populations and fisheries.  The Kilbrannan Sound EMP which covers all of the MOWI fish
farms in the FMA states that this will be achieved by: 
 monitoring, 
 co-operation; and 
 adaptive management. 
Page 66

Page 67

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The EMP states that a key goal for the monitoring is to understand the relationship between
lice on farms in the Management Area and lice infections (and related mortality) on wild
salmonids and this will be achieved through the development of a science strategy that will in
four key components.  These are monitoring lice infection of wild salmonids, monitoring total
lice emissions from farming activity, the production of a lice connectivity model and acoustic
tracking studies to map smolt migration pathways. 
Since this application was submitted, the applicant has advised that wild fish monitoring has
commenced in relation to the Endrick Water SAC in advance of the determination of this
planning application in order to establish a base line position pre-development.  This will
enhance the existing fish monitoring in the water catchment by adding 53 new monitoring
locations (on the River Leven, Endrick Water and Blane Water).  This is focused on locations
where there is no information on wild fish population status.  The baseline monitoring
programme will extend over a 3-year period with 2023 being year 3. A report on data obtained
for year 1 (2021) has already been submitted to NatureScot with the reporting for year 2 (2022)
data presently under way. The full 3 years monitoring needs to be completed before
conclusions can be drawn, but the monitoring will fill in any gaps in knowledge and provide a
comprehensive, catchment wide assessment of the health of wild salmonid populations in the
Endrick SAC catchment providing a baseline position to monitor future change against (from
all pressures). 
In terms of cooperation, the EMP states that the operator will facilitate access for stakeholders
to observe farm lice counts.  The EMP also commits to information sharing including a
summary of lice counts at all stages.  There is also a commitment to notify stakeholders should
the sites in the Management Area breach CoGP level or the maximum sea lice load for the
area exceeds that set out in the Statement of Operation Practice.  The EMP also commits the
applicant to meetings with stakeholders at least twice per complete production cycle this will
also include provisions for discussion on the Endrick Water SAC. 
The adaptive management element of the EMP requires the operator to be responsive to
evidence of impacts on wild salmon populations from farming activity.  Where data generated
under this EMP suggests that farming activity in the Management Area is impacting on wild
salmonids or leading to elevated risk on SAC salmon populations, the operator shall take all
necessary management measures, including, if required, material changes to the operation of
farms in order to mitigate those impacts to so far as reasonably possible. 
The EMP also contains a requirement for an end of production cycle review meeting.  Where
monitoring evidence suggests a population regulating effect arising from sea lice, or impacts
arising from an escape are identified, appropriate management measures will be agreed.  The
operator will identify and deploy outcome-focused alternative management actions designed
to prevent any such impacts from occurring during the next production cycle.  Farms in the
area will not be re-stocked until the alternative management actions have been agreed by the
parties.  If impacts on wild fish are identified over consecutive production cycles, despite
management action having been deployed to mitigate those impacts, then further
management action will be required.  Such management action may include early harvest,
reduction in biomass at any appropriate sites or relocation of some production to a different
location. 
The EMP has been agreed between the applicant and the Argyll District Salmon Fishery
Board.  Marine Scotland Science has advised the planning authority that the EMP contains all
the required components. 
Taking account of the above, it is considered that the proposal would accord with NPF4
policies 3, 4 and 32 and LDP policies LDP 3, LDP 5, SG LDP ENV1, SG LDP ENV 2 and SG
LDP AQUA 1.
Page 67

Page 68

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
6) Ecological Status of Water Bodies and Biological Carrying Capacity  
The site is located within ‘uncategorised’ waters under Marine Scotland’s Locational
Guidelines, which indicates better prospects of fish farm developments being acceptable in
environmental terms given the open situation, and the depth of water with unconstrained water
exchange. SEPA are responsible for controlling water column impacts via its CAR licensing
process and have confirmed that compliance with the CAR permit should ensure that the
production of fish at this farm will not breach SEPA’s environmental standards for protection
of the surrounding seabed and water column.   
With regard to NPF4 policy 3, policies 3b and 3c do not apply to open water fish farms.  The
requirements of polices 3a and 3d have been addressed within the EIAR.  In particular, chapter
10 of the EIAR considers the impact on the benthic environment.  This concludes that efficient
operational practices will keep the organic load to the benthic environment to a minimum.  No
Priority Marine Features (PMFs) or habitats where identified by video analysis and there are
no designations within the predicted area of benthic impact.  The modelling undertaken
indicated that the proposed development would be sustainable and within the requirements
set by SEPA.   
SEPA have advised that at CAR licence has been issued for this site, therefore, it is not
considered that the proposal would conflict with policy SG LDP ENV 7 which resists
development which would have a detrimental impact on the water environment.  The proposal
would also accord with policy SG LDP AQUA 1 and NPF 4 polices 3 and 32. 
7) Commercial and Recreational Activity 
The EIAR contains a chapter on navigation, anchorage, commercial fisheries and other non-
recreational maritime uses.  A fish farm uses up space on the sea that can obstruct or impede
the activities of other maritime users.  At the pre-application / scoping stage of this proposal
MOWI sought the views of the Council, Clyde Fishermen’s Association, the MOD and the
Royal Yachting Association.  The following non-recreational marine users and activities were
identified near North Kilbrannan: 
 Kilbrannan Sound is within a Military Exercise Area;
 The nearest port, harbour, marina or slipway is the Claonaig Ferry Terminal
approximately 7.2km away;
 There are no ferry routes near North Kilbrannan.
 Fishing effort and relative value of fishing in the area around the proposed site are
medium.  Most of the fishing effort and value are concentrated over the other side of
Arran in the Firth of Clyde. 
The impacts on navigation, commercial shipping and fisheries were assessed in the EIAR by
accessing publicly available data and through consultation. Commercial shipping was
assessed as a low sensitivity receptor due to the low frequency of transits through the area. 
The location of the farm outwith the main route through the Kilbrannan Sound indicates that
the magnitude of impact would also be low.  Therefore the overall impact on commercial
navigation is assessed as minor. 
Recreational shipping has also been assessed as a low sensitivity receptor.  Similar to
commercial shipping, due to the farm being located outwith the main route through the Sound,
the magnitude of impact would also be low.  Therefore the overall impact on recreational
navigation is assessed as minor.
Page 68

Page 69

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
In terms of commercial fisheries, the key impacts associated with the proposal are identified
within the EIAR as being: 
 The physical displacement of fishing activity from the area;
 Impacts arising from the depositional footprint of carbon and infeed residues;
 Impacts on navigation and safety arising from additional infrastructure. 
Data from Marine Scotland NMPi indicates that most commercial fishing vessels in the area
operate in the Firth of Clyde with an average of 14 to 20 vessels operating in the Kilbrannan
Sound. 
The EIAR concludes that commercial fisheries populations are classified as a low sensitivity
receptor in terms of economic value due to the existing low commercially viable marine
populations identified.  The number of fishing vessels is also low, therefore the overall
significance on commercial fisheries is assessed as minor. 
The Clyde Fishermen’s Association were consulted on this application and have objected on
a number of grounds including the loss of fishing grounds to indigenous fishermen.  They
contend that this particular area will take away safe fishing grounds for prawn fishing.   
The Council’s Marine and Coastal Policy Officer has noted that ScotMAP data (Oct 2020)
shows that the marine area of the farm is of low-medium value for nephrops / crab creel and
trawl fishing.  She has further noted that the moorings area which would extend to 30.6 ha
might interact with fishing activity and could be considered significant, however it was
concluded that no significant environmental effects were considered likely in relation to risk to
navigation and anchorages and other marine users. 
The MOD were consulted through the EIAR process and advised that there were no objections
regarding this activity in the location specified. 
Taking account of the above, it is considered that there may be some impacts on commercial
fishing, taking account of the conclusions of the EIAR and consultation responses, it is not
considered that these would be of a significance that would provide a sustainable reason for
the refusal of the application. 
It is therefore considered that the proposal would accord with the development plan on this
issue, namely NPF4 policy 32 and LDP policies LDP 5 and AQUA 1. 
8) Amenity issues arising from operational effects (waste, noise, light and
colour) 
The EIAR contains a chapter which considers noise.  Potential receptors to noise impacts
were identified within a 1km buffer from the proposed farm site.  No high sensitivity receptors
were identified and potential receptors included occasional walkers associated with the
coastline, recreational users (boats/kayakers) and fishing boats.  Other marine users include
yachts and power boats.  No stationary receptors were identified.  The receptors were
assessed to be of low sensitivity and the magnitude of the impact was assessed to be minor
resulting in an overall minor impact. 
The EIAR contains a Chapter on waste management (non-fish).  This details the nature of
waste generated at a fish farm and classifies how it is managed.  It is noted that waste
management processes are currently certified under ISO 14001 which is an environmental
management certification.  This chapter also states that MOWI is committed to reducing waste
Page 69

Page 70

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
and makes efforts to re-use and repair equipment where possible.  Whilst a Waste
Management Plan has been submitted as an Annex of the EIAR, a further condition is
recommended in order to allow the planning authority to fully consider the applicant’s
proposals for the storage, separation and collection of waste including proposals for uplift
where fish farm equipment has become detached from the site. 
The Council’s Public Protection service have requested that a condition be applied to require
further details of the fresh water supply which will serve the proposed feed barge.  The
applicant has advised that they would be happy with such a condition and have advised that
the proposed feed barge would be of a modern design which will ensure a safe working
platform for staff.  There will be no provision for overnight accommodation for staff.  In terms
of welfare facilities and water provision, he feed barge design will include integral water
storage tanks which form the basis for freshwater supply needs.  Water would be sourced
from a land based mains supply and transferred to the barge by bulk container.  Additional
treatment in the form of appropriate filtration and treatment such as ultraviolet disinfection
would also be fitted to ensure the water is wholesome for consumption.   
The would not conflict with NPF4 policies 12 and 23 and LDP policies LDP 10, SG LDP SG
BAD 1, SG LDP SERV 5b 
9) Economic Impact 
It is stated that the site would require 10 permanently employed members of staff and
potentially seasonal workers during the summer and in the second year of the production
cycle.  The applicant has advised that the development would also support 68 supply chain
jobs within Argyll and across Scotland.  An economic impact assessment presented in support
of the application assesses that the development will generate wider benefits including an
operational annual GVA Impact of £1.2M to the Scottish economy. The assessment concludes
that for every pound of investment in the project over a 20-year period, approximately four
pounds are returned to the Scottish economy. 
The development would be serviced from Carradale Harbour from a new, upgraded shore
base facility that the applicant has committed to develop.  This would incorporate community
benefit elements including a new pontoon for small vessels which would operate on a shared
community use basis. The proposed shore base would be in a prominent location within
Carradale harbour with extensive works having been undertaken to remediate significant
quantities of historic waste deposits from the land offering further opportunities for the
renovation and use of historic harbour buildings as part of the shore-based development. 
It is considered that the proposal would have a positive economic impact in the local and wider
are in accordance with NPF4 policy 25 and LDP policies LDP 5 and SG LDP AQUA 1. 
4. Effects of Fish Farm Medication on Human Health 
A number of representations associated with this planning application have raised concerns
about adverse effects of fish farm medications on wild swimmers.  This issue arose after the
submission of the planning application and did not form part of the EIAR.  Human health is a
specified criterial within the EIA process.  The determination of this application has incurred a
significant delay due to information being requested on this topic.  A report was commissioned
by the Scottish Salmon Producers Organisation (now Salmon Scotland) and submitted by the
applicant.  This report produced by WCA was advertised as supplementary information to the
EIA.  The objective of the report was to assess the potential health risks to open water
swimmers in the vicinity of fish farms in Scotland in relation to medicinal treatments applied
Page 70

Page 71

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
for the control of sea lice on salmon.  The report has considered three substances, namely
azamethiphos, deltamethrin and hydrogen peroxide.   
Medicinal sea lice treatments using known amounts of the substances are carried out in one
of two ways: 
 Bath treatments in-situ. By enclosing the pen in question fully with a large
tarpaulin. The net is lifted to gently crowd the fish together in the smallest safe
volume. The tarpaulin is passed underneath the net and pulled up around the
pen above the water level. When the fish are totally enclosed in the tarpaulin,
treatment can begin. Once the treatment is completed the tarpaulin is removed
and the treatment water released into the sea. 
 Fish may be treated in tanks on board specialist wellboats. Following treatment,
the dislodged lice are collected and disposed of, then the treatment water is
released into the sea. 
With regard to azamethiphos and deltamethrin the report concludes that the concentrations
used to treat fish are safe for open water swimmers, even before dilution and dispersion occurs
in open waters.  However, for hydrogen peroxide there is a risk associated with the
concentrations of hydrogen peroxide used in the fish treatment paths, therefore,
characterisation of dilution and dispersion are likely to be required to be taken into account to
demonstrate that discharges of hydrogen peroxide are safe for open water swimmers. 
NHS Highland were consulted on the WCA report and did not provide a definitive response
however they confirmed that they did not object to the proposal.  As an extra precautionary
measure a condition is proposed requiring the company to provide a Communications Plan to
advise water users when bath treatments are in use at the farm.  This also requires the
production of a Monitoring Plan to investigate the dispersal and dilution of Hydrogen Peroxide
following its use in bath treatments on the site and the use of these findings to review and
update the conclusions the Communications Plan.   
Subject to the imposition of this condition it is considered that the proposal would comply with
NPF4 Policy 23 which seeks to protect people and places from environmental harm and
mitigate risks arising from safety hazards.
Page 71

Page 72

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Appendix B 
HABITATS REGULATIONS ‘APPROPRIATE ASSESSMENT’
HABITAT DIRECTIVE 92-43-EEC
THE CONSERVATION (NATURAL HABITATS AND C.) REGULATIONS 1994 
AS AMENDED 
Endrick Water Special Area of Conservation 
Purpose of the designation 
The Habitats Directive aims to conserve biodiversity by maintaining or restoring species to
favourable conservation status. The Endrick Water was classified as a Special Area of
Conservation for three species of freshwater fish in 2005.  The primary qualifiers for this site
are brook lamprey (Lampetra planeri) and river Lamprey (Lampetra fluviatilis).  Atlantic
salmon (Salmo salar) are a secondary qualifier for this site.  Neither brook nor river lamprey
will be impacted by the proposal. 
The purpose of the designation is to avoid deterioration of the habitats of the qualifying
species or significant disturbance to the qualifying species, thus ensuring that the integrity of
the site is maintained and the site makes an appropriate contribution to achieving favourable
conservation status for each of the qualifying features; and to ensure for the qualifying
species that the following are maintained in the long term: 
 Population of the species, including range of genetic types for salmon, as a viable
component of the site;
 Distribution of the species within site
 Distribution and extent of habitats supporting the species;
 Structure, function and supporting processes of habitats supporting the species;
 No significant disturbance of the species. 
Consequences of the designation 
In circumstances where European Protected Species could be subject to significant effects
as a consequence of development proposals, the competent authority, in considering
whether development should be consented, is required to undertake an ‘appropriate
assessment’ to inform its decision-making process, on the basis that where unacceptable
effects are identified, or in cases of ‘reasonable scientific doubt’, then permission ought not
to be granted. 
An ‘appropriate assessment’ is required to be undertaken in cases where any plan or project
which: 
(a)  Either alone or in combination with other plans or projects would be likely to have
significant effect on a European site designated for nature conservation; and 
(b)  Is not directly connected with the management of the site. 
It is considered by NatureScot that the proposal is likely to have a significant effect on the
Atlantic Salmon qualifying interest of the site.  The proposed site lies approximately 70km to
Page 72

Page 73

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
the south-west of the boundary of the SAC as the crow flies.  However, wild salmonids and
Atlantic salmon smolts emigrate through the Firth of Clyde. As a consequence, Argyll and
Bute Council has conducted an ‘appropriate assessment’, as per the Conservation (Habitats
and C.) Regulations 1994 (as amended), having regard to the anticipated effects of
development and the conservation objectives for the site’s qualifying interests. This
assessment is detailed below. 
Characteristics of the development 
The proposal is for the equipping and operation of a marine fish farm with farmed fish to be
contained in 12 pens, comprising nets supported from flotation rings secured to a mooring
grid with associated feed barge. The proposal is likely to have a significant effect on the
Atlantic salmon feature of the Endrick Water SAC due to: 
 The risk posed as a result of the potential impacts of sea lice on Atlantic salmon
smolts emigrating through the Firth of Clyde; and 
 Genetic introgression should farmed Atlantic salmon escape into the wild. 
Assessment 
It is not considered that there would be any impact on the brook or river lamprey interest of
the SAC. 
The assessment considers the impact of the proposals on Atlantic salmon and has regard to
the applicant’s submitted information in support of the planning application, and to
consultation advice provided by NatureScot. 
NatureScot has raised concerns about the submitted proposal on the basis that the operation
of the farm, as envisaged by the applicants, could in their view affect the qualifying interests
of the SAC. They object to the proposal due to the potential impact on the SAC unless it was
subject to conditions requiring operation strictly in accordance with the proposed mitigation
measures. 
The site is some 70km from the SAC and will have no direct impact on the boundaries of the
SAC. However, it could impact on the qualifying interest of the Atlantic salmon, including
smolts, as they travel through the Firth of Clyde. 
The site will generate sea lice which would disperse in the wider Firth of Clyde. The greater
the level of lice, the greater the potential impact on the qualifying interests within the Firth of
Clyde. An escape of farmed fish has the potential for interaction with wild salmonids within
the Firth of Clyde. 
NatureScot has advised that extensive literature exists which demonstrates the negative
impacts of aquaculture derived sea lice on early marine survival of post smolt Atlantic salmon
(and sea trout which may stay in the Clyde all year) and proximity of marine fin fish
aquaculture units. 
The Atlantic salmon qualifying interest of the Endrick Water SAC was in an unfavourable
condition (both for juvenile and adult fish) in 2005 and 2011 as evidenced by Site Condition
Monitoring.  Assessments carried out by Marine Scotland Science determined that for 2019,
the Endrick Water SAC met the criteria for inclusion in category 2 (where the population has
a 60 to 80% probability of meeting its conservation limit and may require management action
to reduce exploitation).
Page 73

Page 74

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
The rod catch for the whole of Scotland, which is frequently used as a proxy for population
trends, showed that the 2018 rod catch was at its lowest levels since records began in 1952. 
Atlantic salmon both nationally and within the Endrick Water SAC, are therefore considered
to be vulnerable. 
Atlantic salmon are anadromous and undertake extensive migrations between freshwater
and marine habitats.  Smolt migration is associated with high mortality and is thus considered
a critical life stage in the Atlantic salmon life history.  Currently only about 5% of smolts who
make the journey return to freshwater as adults. 
Smolts originating from the Lomond catchment (which includes the Endrick Water SAC) and
the Clyde catchment (which includes the rivers Clyde, Gryffe, Black Cart Water and White
Cart Water) migrate to their oceanic feeding grounds in the Norwegian Sea and West
Greenland via the Inner and Outer Clyde.  This means that these fish will pass through the
main channel and southward past the east coast of Bute and the island of Little and Great
Cumbrae (possibly including the Fairlie Roads) as they pass into the Arran Basin and outer
Firth of Clyde.   
Nature Scot further advise that whilst they do not know the exact migration route of Atlantic
salmon post smolts emigrating from the Endrick Water SAC, there is potential for them to
pass through lice dispersion plumes emanating from the proposal. 
NatureScot advise that the proposal would not adversely affect the integrity of the SAC as
they consider that short term elevated lice levels would not compromise Conservation
Objective 1: ‘Population of the Species, including range of genetic types for salmon, as a
viable component of the site’.  However, persistent elevated lice levels recurring during
periods of the smolt run could, in the long term, compromise this conservation objective. 
NatureScot has advised that MOWI’s revised EMP (December 2020) in combination with
suggested planning conditions would provide Argyll and Bute Council with an enforceable
framework to ensure that any elevated risk to the Endrick Water SAC as a result of this
proposal could be identified and mitigated thus ensuring that any adverse effect on the
integrity of the site would be avoided.  In addition to adherence to the EMP process,
managing risk to the Endrick Water SAC qualifying feature can be further mitigated by full
adoption of the current Scottish Technical Standards and embedded best practice to mitigate
the risk of equipment failure and subsequent farmed salmon escapes. 
Recommended mitigation to be secured by planning condition, should permission be
granted. 
NatureScot advise that on the basis of the appraisal carried out to date, if the proposal is
carried out strictly in accordance with the revised EMP, it is concluded that the proposal
would not adversely affect the integrity of the Endrick Water SAC: 
1. Under the revised EMP, the applicant will undertake a programme of wild fish
monitoring to measure levels of sea lice infestation pressure on wild salmonids in
coastal waters within a zone of 30km from the Management Area (section 5.1 of the
EMP).  For the avoidance of doubt, NatureScot recommend that a planning condition
is applied to any consent that states that the site is not stocked until the monitoring
plan has been agreed, including a requirement to monitor the juvenile salmon
population.
Page 74

Page 75

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
2. The applicant will keep a weekly record of estimated total lice emissions which will be
used to calculate a ‘lice load’ in the Management Area (section 5.2 of the EMP).
3. The applicant will carry out sea lice dispersion modelling as part of the plan.  This will
be used to guide the monitoring strategy (section 5.3 of the EMP).
4. The applicant will work with the Argyll District Salmon Fishery Board to design an
appropriate acoustic tracking study which aims to address information gaps
associated with the migration of salmon smolts (section 5.4 of the EMP).
5. An additional monitoring programme will be designed and implemented to produce
data on the health of wild salmonid populations in the Endrick Water SAC (section 5.6
of the EMP).
6. The EMP commits the applicant to meet with stakeholders at least twice per
production cycle.  Meeting will be scheduled to take place prior to the wild smolt
migration periods and one meeting to be held at the end of the production cycle
(section 6.3 of the EMP).  In addition to this, we recommend that as part of the end of
cycle review, the site will not be restocked until the review has been agreed by Argyll
and Bute Council in consultation with NatureScot.
7. The applicant will adhere to the Scottish Technical Standard for aquaculture
equipment to reduce the risk of equipment failure and the subsequent occurrence of
any significant escape of farmed salmon escapes. 
Conclusion  
The potential impacts of the development in relation to the conservation objectives cited in
the SAC designation have been considered in the light of the above and it has been
concluded that with identified mitigation measures in place the impacts arising from the
operation of the development as proposed, in combination with the operation of other farms
nearby will not have a significant impact upon qualifying interests, and accordingly there is
no reason to withhold permission on European nature conservation grounds.  
Page 75

Page 76

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Appendix C 
HABITATS REGULATIONS ‘APPROPRIATE ASSESSMENT’
HABITAT DIRECTIVE 92-43-EEC
THE CONSERVATION (NATURAL HABITATS AND C.) REGULATIONS 1994 
AS AMENDED 
Ailsa Craig Special Protection Area 
Purpose of the designation 
The Habitats Directive aims to conserve biodiversity by maintaining or restoring
species to favourable conservation status. The Ailsa Craig Special Protection Area
(SPA) was classified 25th April 1990 and extended 25th September 2009. It covers
the Ailsa Craig Island and approximately 2km into the marine environment, including
the seabed, water column and surface. It has a qualifying interest by regularly
supporting populations of migratory species namely; northern gannet (Morus
bassanus) and lesser black-backed gull (Larus fuscus). If also has a qualifying
interest at regularly supports in excess of 20,000 individual seabirds including
common guillemot (Uria aalge), black-legged kittiwake (Rissa tridactyla) and herring
gull (Larus argentatus). 
The purpose of the designation is to avoid deterioration of the habitats of the
qualifying species or significant disturbance to the qualifying species, thus ensuring
that the integrity of the site is maintained:
 Population of the species as a viable component of the site;
 Distribution of the species within site;
 Distribution and extent of habitats supporting the species;
 Structure, function and supporting processes of habitats supporting the
species;
 No significant disturbance of the species. 
Consequences of the designation 
In circumstances where European Protected Species could be subject to significant
effects as a consequence of development proposals, the competent authority, in
considering whether development should be consented, is required to undertake an
‘appropriate assessment’ to inform its decision-making process, on the basis that
where unacceptable effects are identified, or in cases of ‘reasonable scientific doubt’,
then permission ought not to be granted. 
An ‘appropriate assessment’ is required to be undertaken in cases where any plan
or project which: 
(a)  Either alone or in combination with other plans or projects would be likely to
have a significant effect on a European site designated for nature conservation;
and 
(b)  Is not directly connected with the management of the site. 
Page 76

Page 77

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
It is considered by NatureScot that the proposal could affect the qualifying interests,
except for kittiwake, of Ailsa Craig SPA. The proposed site lies approximately 50km
to the north west of the boundary of the SPA.  However, this is within the mean
maximum foraging range for birds identified as the qualifying interest of the SPA. As
a consequence, Argyll Bute Council has conducted an ‘appropriate assessment’, as
per the Conservation (Habitats and C.) Regulations 1994 (as amended), having
regard to the anticipated effects of development and the conservation objectives for
the site’s qualifying interests. This assessment is detailed below. 
Characteristics of the development 
The proposal is for a new Atlantic salmon marine fish farm located in the Kilbrannan
Sound off the east coast of Kintyre north of Cour Bay.  The development comprises
12 no., 120 metre circumference pens arranged in a 2 x 6m regular grid with
associated moorings to the sea bed. 
NatureScot advise that the site is located within the mean maximum foraging range
of the qualifying features of the Ailsa Craig SPA which are: breeding seabird
assemblage, gannet (breeding), common guillemot (breeding), herring gull
(breeding), kittiwake (breeding) and lesser black-backed gulls (breeding). 
Furthermore for gannets, kittiwakes, lesser black-backed gulls and guillemots, the
proposal is within their mean foraging distance (plus one standard deviation) from
Ailsa Craig SPA. 
NatureScot advise that the potential pathways for marine birds in relation to finfish
farms are: 
1) Entanglement or entrapment in top, cage or antipredator netting or in any nets
deployed to recapture stock in event of escape;
2) Disturbance in the vicinity of the farm and / or associated vessels;
3) Direct displacement from the farm footprint; and
4) Loss of or damage to prey-supporting habitats in the vicinity of the farm and / or
as a consequence of export of organic materials or chemicals from the farm site. 
Assessment 
All of the qualifying features of the Ailsa Craig SPA are within their mean maximum
foraging range of the proposal which sits approximately 50km from the SPA. 
Furthermore, for gannets, kittiwakes, lesser black-backed gulls and guillemots, the
proposal is within their main foraging distance (plus one standard deviation) from
Ailsa Craig SPA. 
NatureScot’s assessment focuses on those qualifying features which NatureScot
identified as a likely significant effect (LSE) during the screening / scoping stage:
northern gannet, herring gull, lesser black-backed gull and guillemot.  No LSE is
anticipated for kittiwake. 
In the context of the overall foraging range available to the qualifying species,
NatureScot advise that it is unlikely that disturbance (impact pathway 2),
displacement (impact pathway 3), or loss of habitat (impact pathway 4) as a result of
Page 77

Page 78

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
the proposal would result in any likely significant effects for the qualifying features of
the SPA.  NatureScot’s assessment therefore focuses on the potential for
entanglement or entrapment in netting associated with the fish farm. 
NatureScot have provided a summary table on their assessment on the qualifying
features of the Ailsa Craig SPA which is shown below: 
NatureScot advises that there are also a number of other bird species which may
use the Kilbrannan Sound for foraging or maintenance activities, including breeding
road throated divers (an Annex 1 species), as red-throated diver nests have been
recorded within 10km of the proposal.  In addition to the species within the table
above, should there be any other instances of other bird species being entrapped or
entangled in netting at the site (e.g. shag, cormorants, sea eagles, diver species)
NatureScot would also request to be notified. 
In conjunction with the embedded mitigation already proposed by the applicant,
NatureScot would recommend that further mitigation is added through adoption of a
smaller mesh (ideally 50mm) panels at the base of side nets, as opposed to having
100mm in both ceiling and side panels, as is suggested by the application.  This is
to reduce the risks to large gull species being entrapped or entangled in netting. 
Gannets
Bird Entrapment Incident 
In 2019 there was a bird entrapment issue at Carradale Fish Farm.  An operational
error at the farm resulted in 200mm top nets being installed rather than 100mm.  This
resulted in the entrapment of a number of gannets and gull species.  The fish farm
log book was incomplete and contradictory.  The incident notes state that there were
no fatalities or injuries, however, this conflicted with an account from a member of
the public.  NatureScot have not been able to verify either account of the entrapment
incident and feel that this highlights the need for robust and systematic recording and
reporting on entanglement / entrapment events.  Once the problem with the net size
was identified, it took several weeks for this to be rectified during which more birds
became entrapped. 
Page 78

Page 79

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
NatureScot have advised that studies indicate that there is a high level of segregation
among foraging areas used by gannets from different colonies during the breeding
season.  As such, it might be expected that the majority of breeding gannets foraging
in the Kilbrannan Sound will derive from the Ailsa Craig SPA.  Gannets are known to
use the Kilbrannan Sound at particular times of year when their food sources are
present. 
NatureScot contend that there is some confusion within the shadow HRA submitted
by the applicant.  NatureScot advise that gannets use of the area should be
considered as being ‘moderate’ and the connectivity as being ‘high’ for this proposal. 
This is especially the case considering the distance between the proposal and Ailsa
Craig SPA is less than half the gannet mean foraging range.  The applicant’s report
also states that “in a worse case scenario low numbers could occasionally be
entrapped but experience at the nearby Carradale Fish Farm shows these can be
quickly released unharmed”.  NatureScot have taken issue with this due to the poor
record keeping and conflicting reports received by the member of the public. 
NatureScot further advise that the influence of ceiling mesh net size on the potential
risk to gannets associated with pole mounted top net systems is as yet unknown. 
The incident at Carradale Fish Farm demonstrates that gannets have attempted to
plunge dive through 200mm mesh nets and consequently risked entrapment or
entanglement. On theoretical grounds, there may be less risk associated with smaller
(in particular 100mm or less) ceiling mesh sizes, assuming that gannets can clearly
see the nets and accurately judge their potential to enter cages safely through the
mesh.  However, there is currently a lack of empirical data against which to assess
this. 
Given the connectivity with the Ailsa Craig SPA, potential attraction to fish farm cages
and apparent entrapment / entanglement risks to gannets posed by pole mounted
top net systems, NatureScot advise a conclusion of likely significant effects
(LSE)  and possible adverse effect on site integrity (AESI). 
There is currently insufficient information available with respect to the following
aspect to enable NatureScot to draw as robust conclusion as to whether there would
be an AESI. 
 Potential attraction of gannets to fish farms using pole mounted nets;
 Specific risks associated with different configurations of pole mounted nets,
including mesh sizes;
 The number of gannets involved in entrapment incidents and the frequency of
this occurrence;
 The outcome of entrapment and whether it could indeed / has already led to
mortalities in gannets. 
The conclusion is also reached because there could be a cumulative effect with the
nearby Carradale Fish Farms. 
NatureScot advise that any permissions for the use of pole mounted top net systems,
irrespective of mesh sizes, should be subject to review, underpinned by systematic
monitoring and by requirements for immediate notification in the event of emerging
Page 79

Page 80

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
patterns of entanglement or entrapment of marine birds that might ultimately result
in AESI. 
Herring and lesser black-backed gulls 
The origins of herring and lesser black-backed gulls foraging within the Kilbranna
Sound are not clear.  It is possible that some will be from the Ailsa Craig SPA while
some will be from the non-SPA population.  There is potential for connectivity
between Ailsa Craig SPA and the proposed site and therefore as a precautionary
approach, and lacking further information on the gulls’ origins, NatureScot assume
that a least some of the birds will be from the SPA population. 
Gulls’ foraging methods include shallow diving from surface or from low altitudes in
the air when at sea and searching for food when walking on to the shore or further
inland.  At fish farms, it is most likely that they would attempt to access food or fish
food in cages by perching on cage infrastructure, such as handrails or nets and
attempting to push through the mesh.  With respect to the more familiar “hamster
wheel” top net systems, NatureScot consider that mesh sizes of 100mm may pose
relatively high entanglement risk to birds such as gulls and these systems have
typically adopted 50mm mesh to reduce this risk.  Some pole-mounted systems use
smaller (e.g. 50mm) mesh in the lower parts of the side panels, nearest to the
handrails, in an attempt to reduce risk of perching birds becoming entangled. 
It is possible that some gulls from Ailsa Craig SPA may visit the proposal and
therefore NatureScot conclude that there are likely significant effects on both herring
gulls and lesser black-backed gulls with respect to the risk of entrapment and
entanglement.  However, in the context of there being non-SPA populations nearby
for herring and lesser black-backed gulls, particularly those more northerly non-SPA
populations, NatureScot conclude that it is unlikely that the proposal would have an
adverse effect on site integrity.  It is however noted that risks to gulls could be further
reduced by adoption of a smaller mesh (ideally 50mm) panels at the base of side
nets. 
Guillemot 
NatureScot advise that as a diving species, guillemots are potentially susceptible to
entanglement form sub-surface nets.  Guillemots commonly forage in the area
around the proposal and some guillemots in the Kilbrannan Sound are likely to be
from the Ailsa Craig SPA.  NatureScot advise that there are likely significant effects
on guillemots from Ailsa Craig SPA as a result of the potential for entanglement in
sub-surface anti predator nets, should they be deployed.  However there is unlikely
to be an adverse effect on site integrity.  It should be noted that the use of sub-sea
anti-predator nets requires consent from NatureScot first. 
Recommended mitigation to be secured by planning condition, should
permission be granted. 
a) Operators to maintain daily records of wildlife entanglement / entrapment using a
standardised proforma and to submit regular (typically six-monthly) returns to the Local
Authority, copied to NatureScot.
Page 80

Page 81

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
b) Immediate notification by operators to both the Local Authority and NatureScot in the
event of any significant entrapment of entanglement of gannet, or any other SPA interests
identified as relevant to a particular fish farm (e.g. involving three or more birds of any
named species on any one day and / or a total of ten or more birds in the space of any
seven day period and / or repeat incidents involving one or more birds on four or more
consecutive days); and
c) Adaptive management approaches should be agreed between the Local Authority and
the applicant in consultation with NatureScot. 
Conclusion  
The potential impacts of the development in relation to the conservation objectives
cited in the SPA designation have been considered in the light of the above and it
has been concluded that with identified mitigation measures in place the impacts
arising from the operation of the development as proposed, in combination with the
operation of other farms nearby will not, with identified mitigation in place,  have a
significant impact upon qualifying interests, and accordingly there is no reason to
withhold permission on European nature conservation grounds. 
Page 81

Page 82

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Appendix D 
List of Contributors (as of 5th May 2023) 
Representations in relation to 20/01345/MFF 
Objection 
1. Adrian Gooyers No Address Given    
2. AHSS Strathclyde Group Tobacco Merchants House 42 Miller Street Glasgow G1
1DT 
3. Alan Bell 18 Millburn Gardens Largs KA30 9NF  
4. Alex MacCuish No Address Given    
5. Alexander Tetley No Address Given    
6. Alice Maxwell 29B McKelvie Road Isle Of Arran   
7. Alice Mostyn No Address Given    
8. Alice Sheepshanks No Address Given    
9. Alison Farwell No Address Given    
10. Alison Kilpatrick Upper Millhouse Pirnmill Isle Of Arran KA27 8HP 
11. Alistair Eason No Address Given    
12. Amy Jorgensen No Address Given    
13. Andrew Binnie Marchfield  Cordon Isle Of Arran KA27 8NQ 
14. Andrew Griffiths No Address Given    
15. Andrew Holman No Address Given    
16. Andrew Rigby Burncliff Shiskine Isle Of Arran KA27 8HD 
17. Andrew Wilkinson Kincardine Lodge Lochranza Isle Of Arran North Ayrshire 
18. Anita Ford Homelea  Newton Shore Lochranza Isle Of Arran 
19. Ann Hume Stronach Cottage Douglas Place Brodick Isle Of Arran 
20. Ann Turner-Swan 10 The Apostles Catacol KA27 8HN  
21. Anna Owen No Address Given    
22. Anne Archer Sealladh Breagha Gallanach Road Oban PA34 4PD 
23. Anne Fraser No Address Given    
24. Anthony Lowes 35A Pembroke Square London W8 6PD  
25. Anton' De Piro Flat 3 217 Sussex Gardens London W2 2RJ 
26. Archie Cumming No Address Given    
27. Austin Thomson C/o Frazer Coogans Solicitors 163 Main Street Prestwick KA9 1 LB  
28. Ayr And District Salmon Fishery Board No Address Given    
29. Ayrshire Rivers Trust Braeside Burnbrae Lodge Mauchline KA5 5HE 
30. Bill Rigby 25 Tentergate Road Knaresborough North Yorkshire HG5 9BG 
31. Blue Marine Foundation 3rd Floor South Building Somerset House London WC2
R1LA 
32. C L Littlewood No Address Given    
33. C Shannon 38 Suffolk Street Helensburgh G84 9PD  
34. Callum Stammers-Swan No Address Given    
35. Calum Farwell No Address Given    
36. Carol Dunn No Address Given    
37. Caroline Byrne No Address Given    
38. Caroline Younger No Address Given    
39. Carrie Frank No Address Given    
40. Carys Griffiths No Address Given    
41. Caspar Hobbs No Address Given    
42. Catherine Anholt Sunflower House Colyton Devon EX24 6HL 
43. Catherine M Swan Bramleys Chappel Colchester  CO6 2DN 
44. Cathy Adkin Strathroy  Ontario Canada  
Page 82

Page 83

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
45. Cathy Burnett Ard Shonas Lochranza Isle Of Arran  KA27 8JF 
46. Chris Turner-Swan Craigard Catacol KA27 8HN  
47. Christine McKerracher Shepherds Cottage Cour Carradale Argyll 
48. Cicely Gill The Yellow Land Whiting Bay Isle Of Arran KA27 8PZ 
49. Clare Mostyn No Address Given    
50. Clive Meikle 15 Craig Na Gower Avenue Aviemore PH22 1RW  
51. Clyde Porpoise CIC 1/1 Allanton Park Terrace Fairlie KA20 0AW  
52. Clyde River Foundation No Address Given    
53. Colin Burgess Carradale House Carradale Estate Carradale Argyll 
54. Colin McKee Aranaigh Skipness Tarbert Argyll 
55. Cour Ltd Cour Carradale  Campbeltown PA28 6QL 
56. D'Arcy Rice No Address Given    
57. David Ainsley No Address Given    
58. David Bridge Redesdale House Skipness Tarbert Argyll 
59. David Burton No Address Given    
60. David Maguire Navarre Lochranza Isle Of Arran KA27 8HL 
61. David Penn Meadow Cottage Pirnmill Isle of Arran KA278HP 
62. David Pilch 9 The Row Catacol Isle Of Arran KA27 8HN 
63. David Platt The Crags Catacol IOA KA27 8HN 
64. David Stammers Bramleys Chappel Colchester  CO6 2DN 
65. Dennis Adkin Strathroy Ontario Canada  
66. Dennis Archer Sealladh Briagha Gallanach Road Oban Argyll And Bute 
67. Derek McLay 5 Torwood Avenue Larbert FK5 4NG  
68. Donald Macneish Shipfield Lamlash Isle Of Arran KA27 *NB 
69. Donna Macpherson No Address Given    
70. Doug Chase Tigh Na Traigh Shore Rd Lamlash Isle Of Arran 
71. Doug Macpherson No Address Given    
72. E McGrigor No Address Given    
73. Edward Somerfield No Address Given    
74. Elizabeth Nickerson No Address Given    
75. Erica Kerr No Address Given    
76. Eugene O'Connor No Address Given    
77. Fiona Cameron No Address Given    
78. Fiona Clarke Tel-El-Kebir Shiskine Isle of Arran KA27 8HD 
79. Fiona Jeffery No Address Given    
80. Fiona Oakes No Address Given    
81. Freda Lewis Stempel 9 Bolingbroke Grove London SW11 6ER  
82. Freddie Nickerson No Address Given    
83. Friends Of Millstone Point Alba East Drive House Kinneil Lamlash Isle Of Arran 
84. Friends Of The Sound Of Jura No Address Given    
85. George Nickerson No Address Given    
86. George Wilder No Address Given    
87. George Young No Address Given    
88. Giles Taylor No Address Given    
89. Gill Bates No Address Given    
90. Gord Macpherson No Address Given    
91. Gordon Donaldson 52 Sweeney court Ardrossan KA22 8GY  
92. Greg Attwood No Address Given    
93. Grogport Residents No Address Given    
94. Hamish Hunter No Address Given    
95. Harry Nickerson Cour Ltd    
96. Harry Walker Address Not Provided    
97. Hazel Swan No Address Given    
98. Hazel Yabsley 5 Wedmore Road  Hitchin  Herts SG4 9JH 
99. Heather Allman Kilbrannan View Grogport Carradale Campbeltown 
Page 83

Page 84

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
100. Helen Margaret Watson Cheyne No Address Given    
101. Helen Mostyn No Address Given    
102. Henrietta De Ritter Address Not Provided    
103. Henry Page 37A South Parade Oxford OX2 7JN  
104. Hilary Swan No Address Given    
105. Howard Litton St Columba's Church Isle of Arran Whiting Bay KA27 8PX 
106. Hugh Nickerson No Address Given    
107. Iain Sanders 30 Urquhart Place Portree IV51 9HJ  
108. Isabella Cornwall No Address Given    
109. Isobel Neilson No Address Given    
110. J Johnstone No Address Given    
111. J M Campbell Blairbeg House Lamlash KA27 8JT  
112. Jackie Adams No Address Given    
113. Jackie Lamond Sperasaig House Cour   
114. Jacqueline M Lamond No Address Given    
115. James Anderson No Address Given    
116. James McEuen No Address Given    
117. James Tamlyn No Address Given    
118. Jamie Forlan No Address Given    
119. Jane MacLean No Address Given    
120. Janet Jardine 26 Kilmartin Lochgilphead Argyll And Bute PA31 8RN 
121. Jean Platt The Crags Catacol IOA KA27 8HN 
122. Jean Wilkinson Kincardine Lodge Lochranza Isle Of Arran North Ayrshire 
123. Jenny Richmond Not Given    
124. Jess James Skipness Estate    
125. Jo Totty 8 Hillside Terrace Lamlash Isle of Arran KA27 8ND 
126. Joanna De Ritter No Address Given    
127. Joanna McKay Forbes Barmollach Grogport Carradale Campbeltown Argyll
And Bute 
128. John C Adam Bayview House Pirnmill Isle Of Arran KA27 8HP 
129. John Drinkell No Address Given    
130. John Ford Homelea Newton Shore Lochranza Isle Of Arran 
131. Jonathan Jarrett No Address Given    
132. Jonathan Rigby 28 Butterfly Close Pontypridd Wales CF38 1AZ 
133. Josh Barker No Address Given    
134. Judith Jones Greenhill Torrisdale Campbeltown Argyll And Bute 
135. Karen Dixon No Address Given    
136. Katharine Mitchell No Address Given    
137. Kathryn Wells Lagavullin Mill Whitehouse Tarbert Argyll 
138. Katy Penn Meadow Cottage Pirnmill Arran KA27 8HP 
139. Kenneth Borton No Address Given    
140. Krystyna Gruszecka Windygowl  Lochranza  Isle Of Arran  KA27 8JF 
141. Lally Mostyn No Address Given    
142. Laurence Anholt Sunflower House Colyton Devon EX24 6HL 
143. Lavinia Gibbs Dougarie Lodge Dougarie Isle Of Arran KA27 8EB 
144. Leah Battistel No Address Given    
145. Lesley Griffiths No Address Given    
146. Lizzie Adam Bayview House Pirnmill Isle Of Arran  KA27 8HP 
147. Loch Lomond Angling Improvement Association 4 Woodside Place Charing
Cross Glasgow G3 7QF 
148. Loch Lomond Fisheries Trust C/o Bell Barr & Company  Chartered
Accountants  2 Stewart Street  Milngavie  
149. Lucy Kay Elleray Whiting Bay KA27 8RQ  
150. Lucy Mostyn No Address Given    
151. M A Cape No Address Given    
Page 84

Page 85

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
152. Maggie Richmond No Address Given    
153. Malcolm Harle cour farmhouse carradale campbeltown PA28 6QL 
154. Malcolm MacGregor No Address Given    
155. Malcolm Ritchie No Address Given    
156. Marcus Barnett 10-11 Glenthorne Mews London  W6 0LJ  
157. Margaret Somerfield No Address Given    
158. Maria Jose Velazquez No Address Given    
159. Mark Hudson Philipston House Winterborne Clenston Blandford DT11 0NR 
160. Mark Whitaker Ard Shonas Lochranza Isle Of Arran  KA27 8JF 
161. Melissa James No Address Given    
162. Michael Davis No Address Given    
163. Michael Scott Trencrom Lundavra Road Fort William PH33 6JJ 
164. Michal G D Giedroyc No Address Given    
165. Mike Cobban North Thunderguy Pirnmill Isle Of Arran KA27 8HP 
166. Mike Farwell No Address Given    
167. Mike Heyworth Glenside East Skipness PA29 6XT  
168. Naomi Morris No Address Given    
169. Nathaniel Page Upper Leigh Farm Salisbury  SP3 6AP  
170. Neil Polley The Old Rectory PenSelwood WINCANTON BA9 8LS 
171. Nelly Nickerson No Address Given    
172. Nigel Jeffery No Address Given    
173. Nigel Wells Lagavullin Mill Whitehouse Tarbert Argyll 
174. North West Angling Trust Fisheries Consultative Council The Barn  Skirwith 
Penrith  Cumbria  
175. P W Yates No 2 The Row Catacol Isle Of Arran KA27 8HN 
176. Paul Bates No Address Given    
177. Paul Chandler Alba East Drive House Kinneil Lamlash KA27 8JT 
178. Paul MacLean No Address Given    
179. Peter Howland Lower Crossaig Skipness Tarbert PA29 6YQ 
180. Peter McRae 2 North Mains Hill Bathgate EH48 4PF  
181. Peter Watson 10 Henderson Road Inverness IV1 1SN  
182. Philip A R James Skipness Farmhouse Tarbert Argyll PA29 6XU 
183. Philip Mostyn No Address Given    
184. Philip Turner No Address Given    
185. R Crum No Address Given    
186. Rachel Goulding No Address Given    
187. Rete Macpherson No Address Given    
188. Richard Salt 3 Brunenburg Way Axminster Devon EX13 5RD 
189. Richard Stenning No Address Given    
190. River Stinchar Fishery Board River Stinchar Fishery Board Minuntion Pinmore
Girvan 
191. Robert Cowieson Benview Whiting Bay Isle Of Arran KA27 8QT 
192. Robert L Cumming No Address Given    
193. Robert Macpherson No Address Given    
194. Robert Sutcliffe No Address Given    
195. Robin Barnden No Address Given    
196. Ronald Fraser 37 Fleurs Road Elgin Iv30 1ta  
197. Rosie Mostyn No Address Given    
198. Rosie Ranson No Address Given    
199. Roy Jones Greenhill Torrisdale Campbeltown Argyll And Bute 
200. Ruth Attwood No Address Given    
201. Ruth McLaren Sannox Isle Of Arran   
202. S A Campbell Blairbeg House Lamlash KA27 8JT  
203. Sally A Campbell 5 Queen Elizabeth Cottages Furnace PA32 8XX  
204. Sally Ford Homelea Newton Shore Lochranza Isle Of Arran 
Page 85

Page 86

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
205. Salmon And Trout Conservation Scotland Second Floor Office 12 Castle
Street Hereford  HR1 2NL 
206. Sarah Nicholas No Address Given    
207. Sarah North Mid Thundergay Farm Pirnmill Isle of Arran KA27 8HP 
208. Sarah Oldham No Address Given    
209. Scottish And Souther Electricity Networks Per Peter Watson Lead Marine
Consents Manager Scottish Hydro Electric Transmissions Plc 10 Henderson Road 
210. Scottish Creel Fishermens Federation 5 Queen Elizabeth Cottages Furnace
Argyll   
211. Shan Oakes Knaresborough North Yorkshire   
212. Shannon Clements No Address Given    
213. Shenac Graham No Address Given    
214. Sherry Gooyers No Address Given    
215. Silvia Clements No Address Given    
216. Simon J Miller Arnburn Arden Argyllshire G83 8RH 
217. Sue Ash Alba East Drive House Kinneil Lamlash 
218. Sue Tozer North Thunderguy Pirnmill Isle Of Arran KA27 8HP 
219. Susan McMillan Manor Farm North Wootton Somerset BA4 4AG 
220. Sylvie Howland Skipness  Tarbert PA29 6YQ  
221. Tarbert And Skipness Community Council Caol Na Mara Garval Road Tarbert 
222. The River Doon Fishery Board 46 Dalblair Road Ayr KA7 1UQ  
223. Tim James No Address Given    
224. Tim Maxwell No Address Given    
225. Tom De Ritter No Address Given    
226. Valerie Wells Redesdale House Skipness Tarbert Argyll 
227. Venetia De Ritter No Address Given    
228. Will De Ritter No Address Given    
229. William McHugh The Gardens Skipness Tarbert Argyll And Bute 
230. William McKerracher Shepherds Cottage Cour Carradale Argyll 
231. Wyllie Hume Stronach Cottage Douglas Place Brodick Isle Of Arran 
232. Zabdi Keen No 2 Coastguard House Kildonan Isle Of Arran KA27 8SD 
Support 
1. A MacLennan No Address Given    
2. Alastair Barge Otter Ferry Tighnabruaich Argyll PA21 2DH 
3. Alistair Iain No Address Given    
4. Ally Donaldson No Address Given    
5. Billy Glen No Address Given    
6. Campbell Mair No Address Given    
7. Claire Lumley-Holmes No Address Given    
8. Connor Mays Westlinwind 18 Coast Inverasdale Ross shire IV22 2LR 
9. Cramanachd Association Alton House 4 Ballifeary Road Inverness IV3 5PJ 
10. Dale Ferreira Mowi Blar Mhor Industrial Estate Fort William PH33 7PT 
11. David Goodlad No Address Given    
12. David Hutchens Mill Road Kilbirnie KA25 7DZ  
13. David MacGillivray Mowi Fams Office Glen Nevis Business Park Fort William 
14. Donald Fowler Unit 2 Site 23 Kilmory Industrial Estate Lochgilphead Argyll
And Bute 
15. Donald Waring Admiralty Park Admiralty Road Rosyth Fife 
16. Ed Ley-Wilson 22 Drummond Road Inverness IV2 4NB  
17. Eilidh Gray No Address Given    
18. Eleanor Neilson Wester Inshes Farmhouse Inverness IV2 5BG  
Page 86

Page 87

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
19. Finlay Oman 2 Burnside Way Largs KA30 9DL  
20. Fiona Ferreira No Address Given    
21. Geffrey Back Dorset Cleanerfish Ltd Unit 2 Inner Breakwater Portland Port 
Castletown 
22. Graham Smith No Address Given    
23. Iain Angus Campbell No Address Given    
24. Ian Brodie Caledonia Lodge Tormhor Carradale Campbeltown Argyll And
Bute 
25. Ian Prendergast Unit 2 Inner Breakwater Portland Port  Castletown DT5 1PA 
26. Jack Comben Units 2 & 3 Inner Breakwater  Castletown Portland Port 
27. James Deverill EWOS/Cargill Aqua Nutrition Westfield Bathgate Scotland 
28. Jayne Mackay Mowi Farms Office Glen Nevis Business Park Fort William 
29. Justin Whitford No Address Given    
30. Laura Tulip No Address Given    
31. Neil Ferguson No Address Given    
32. Paddy Campbell Northshore Road Grangemouth Docks Grangemouth FK3
8UL 
33. Phil Nickells Hilton Seafood UK Estate Road 2 Grimsby North East
Lincolnshire 
34. Rebecca Bashir Mowi Farms Office Glen Nevis Business Park Fort William 
35. Richard Prickett Unit 1, Inner Breakwater, Portland Port, Dorset,  
36. Robert Fairns No Address Given    
37. Robert Neilson No Address Given    
38. S Mckie No Address Given    
39. Sam Clegg No Address Given    
40. Sarah MacDonald No Address Given    
41. Scott Campbell No Address Given    
42. Stephen O Neill MOWI    
43. Stewart Graham 136 Anderson Street Inverness IV3 8DH  
44. Warren Harvey The Red Shed Carradale Argyll PA28 6SB 
45. Yvonne Booth 45 Camanachd Crescent Fort William PH33 6XZ   
Representation 
1. Harry Nickerson Cour Ltd    
2. M R Jaffa     
Page 87

Page 88

This page is intentionally left blank

Page 89

Page 89

Page 90

This page is intentionally left blank

Page 91

Ref:  ABH1/2009 
ARGYLL AND BUTE COUNCIL 
PROCEDURE NOTE FOR USE AT 
HYBRID DISCRETIONARY HEARING 
HELD BY THE PLANNING, PROTECTIVE SERVICES & LICENSING COMMITTEE 
1. Hybrid meetings are those that will involve a physical location and facilitate
attendees joining virtually if they wish. 
2. The Executive Director with responsibility for Legal and Regulatory Support
will notify the applicant, all representees, supporters and objectors of the
Council’s decision to hold a Hearing and to indicate the date on which the
hearing will take place.  The hearing will proceed on that day, unless the
Council otherwise decides, whether or not some or all of the parties are
represented or not. Statutory consultees (including Community Councils) will
be invited to attend the meeting to provide an oral presentation on their written
submissions to the Committee, if they so wish. Details on how interested
parties can access the meeting will be referenced within the same notification. 
3. On receipt of the notification the applicant, all representees, including
supporters and objectors will be encouraged to appoint one or a small number
of spokespersons to present their views to concentrate on the matters of main
concern to them and to avoid repetition. Parties who wish to speak at the
meeting shall notify Argyll and Bute Council no less than 2 working Days
(excluding public holidays and weekends) prior to the start of the meeting. This
is to facilitate remote access (see note 1) and the good conduct of the
meeting.   
4. The Executive Director with responsibility for Legal and Regulatory Support
will give a minimum of 7 days’ notice of the date and time for the proposed
Hearing to all parties. 
5. The hearing will proceed in the following order and as follows. 
6. The Chair will introduce the Members of the Committee, confirm the parties
present who have indicated their wish to speak and outline the procedure
which will be followed. It is therefore imperative that those parties intending to
speak join the meeting at its commencement. 
7. The Executive Director with responsibility for Development and Economic
Growth’s representative will present their report and recommendations to the
Committee. 
Page 91

Page 92

Ref:  ABH1/2009
8. The applicant will be given an opportunity to present their case for approval of
the proposal and may include in their submission any relevant points made by
representees supporting the application or in relation to points contained in the
written representations of objectors. 
9. The consultees, supporters and objectors in that order (see note 1), will be
given the opportunity to state their case to the Committee.   
10. All parties to the proceedings will be given a period of time to state their case
(see note 3).  In exceptional circumstances and on good cause shown the
Committee may extend the time for a presentation by any of the parties at their
sole discretion. 
11. Members of the Committee only will have the opportunity to put questions to
the Executive Director with responsibility for Development and Economic
Growth’s representative, the applicant, the consultees, the supporters and the
objectors. 
12. At the conclusion of the question session the Executive Director with
responsibility for Development and Economic Growth’s representative, the
applicant, any consultees present, the supporters and the objectors (in that
order) will each be given an opportunity to comment on any particular
information given by any other party after they had made their original
submission and sum up their case. 
13. If at any stage it appears to the Chair that any of the parties is speaking for an
excessive length of time he/she will be entitled to invite them to conclude their
presentation forthwith. (see note 3) 
14. The Chair will ascertain from the parties present that they have had a
reasonable opportunity to state their case. 
15. The Committee will then debate the merits of the application and will reach a
decision on it.  No new information can be introduced after the Committee
begins to debate. 
16. The Chair or the Governance Officer on his/her behalf will announce the
decision. 
17. A summary of the proceedings will be recorded by the Committee Services
Officer. 
NOTE 
(1) If you wish to speak at the hearing you will require to notify the
Committee Services Officer no less than 2 working Days (excluding
public holidays and weekends) prior to the start of the meeting. This is
to facilitate remote access if required and the good conduct of the
meeting.
Page 92

Page 93

Ref:  ABH1/2009 
In the event that a party wishes to speak to a visual presentation, this
requires to be sent to Committee Services no less than 2 working days
(excluding public holidays and weekends) before the commencement of
the Hearing; this will not be shared with other parties prior to the
meeting but will ensure its availability for the commencement of the
Hearing. The Committee Services Officer will control the slides under
explicit instruction from the spokesperson(s), it would therefore be
helpful if the slides were individually numbered. It would also be helpful
if the file size of the presentations is kept to a minimum to mitigate
against any potential IT issues – guidance can be provided if required. 
If it is your intention to join the hearing to observe the proceedings,
please advise the Committee Services Officer no less than 2 working
Days (excluding public holidays and weekends) prior to the start of the
meeting to facilitate remote access if required.   
(2)   Councillors (other than those on the Committee) who have made
written representations and who wish to speak at the hearing will do so
under note 1 above according to their representations but will be heard
by the Committee individually. 
(3) Recognising the level of representation the following time periods have
been allocated to the parties involved in the Hearing. For the avoidance
of doubt the time allocated will be per party and will include for example
all supporters/objectors in the half hour slot except where additional
time is agreed by the Chair. 
The representative of the Executive Director with responsibility for
Development and Economic Growth – not more than half an hour
The Applicant - not more than half an hour. 
The Consultees - not more than half an hour. 
The Supporters - not more than half an hour. 
The Objectors - not more than half an hour.  
(4) The purpose of the meeting is to ensure that all relevant information is
before the Committee and this is best achieved when people with
similar views co-operate in making their submissions. 
(5) Everyone properly qualified as a representee recorded on the
application report who wishes to be given an opportunity to speak will
be given such opportunity subject to the requirements for notice herein.
(6) Should, for any reason, Members of the Committee who are joining
remotely lose connection or have any technical issues during the
meeting, they will be asked to contact the Governance or Committee
Support officer, if possible, by email or instant message. A short
adjournment may be taken to try and resolve the connection. If the
Members of the Committee are unable to re-join the meeting and a
quorum still exists then the meeting will continue to proceed. If a
Page 93

Page 94

Ref:  ABH1/2009
quorum does not exist the meeting will require to be adjourned. For the
avoidance of doubt Members of the Committee have to be present for
the whole hearing in order to take part in the decision. 
(7) Should, for any reason, participants joining the hearing remotely lose
connection or have any technical issues during the meeting, a short
adjournment may be taken to try and resolve the connection. In the
event the connection cannot be restored within a reasonable timeframe
consideration will be given to the continuation of the meeting. 
(8) Members of the Committee joining remotely will use the hands up
function to indicate to the Chair when they wish to speak to ask a
question or make a comment.  This function will be monitored by the
Chair and by governance staff in attendance.   
(9) Where a Councillor who is a member of the PPSL has made or wishes
to make a representation (on behalf of any party) during the meeting in
relation to the application under consideration, they should make their
position clear to the Chair and declare an interest. Having done so, they
may, at the appropriate time, make the relevant representation and
then must retire fully from the meeting room prior to deliberation of the
matter commencing.  A Councillor, not a member of the PPSL, may
make a representation (on behalf of any party) during the meeting in
relation to the application then must retire fully from the meeting room
prior to deliberation of the matter commencing. 
(10)  The Council has developed guidance for Councillors on the need to
compose a competent motion if they consider that they do not support
the recommendation from the Executive Director with responsibility for
Development and Economic Growth which is attached hereto. 
I:data/typing/virtual planning hearings/procedure note
Page 94

Page 95

Ref:  ABH1/2009
COMPETENT MOTIONS 
 Why is there a need for a competent motion? 
o Need to avoid challenge by “third party” to local authority decision which
may result in award of expenses and/or decision being overturned. 
o Challenges may arise from: judicial review, planning appeal, ombudsman
(maladministration) referral. Expenses may be awarded against
unsuccessful parties, or on the basis of one party acting in an unreasonable
manner, in appeal/review proceedings. 
 Member/Officer protocol for agreeing competent motion: 
o The process that should be followed should Members be minded to go
against an officer’s recommendation is set out below. 
 The key elements involved in formulating a competent motion: 
o It is preferable to have discussed the component parts of a competent
motion with the relevant Member in advance of the Committee (role of
professional officers).  This does not mean that a Member has prejudged
the matter but rather will reflect discussions on whether opinions contrary to
that of professional officers have a sound basis as material planning
considerations. 
o A motion should relate to material considerations only. 
o A motion must address the issue as to whether proposals are considered
consistent with Adopted Policy of justified as a departure to the
Development Plan.  Departure must be determined as being major or minor. 
o If a motion for approval is on the basis of being consistent with policy
reasoned justification for considering why it is consistent with policy contrary
to the Head of Development and Economic Growth’s recommendation must
be clearly stated and minuted. 
o If a motion for approval is on the basis of a departure from policy, reasoned
justification for that departure must be clearly stated and minuted. 
Consideration should be given to holding a PAN 41 Hearing (determined by
policy grounds for objection, how up to date development plan policies are,
volume and strength of representation/contention) 
o A motion should also address planning conditions and the need for a
Section 75 Agreement. 
o Advice from the Scottish Government as contained within Planning Circular
3/2013: Development management procedures on the definition of a
material planning consideration is attached herewith However, interested
parties should always seek their own advice on matters relating to legal or
Page 95

Page 96

Ref:  ABH1/2009
planning considerations as the Council cannot be held liable for any error or
omission in the said guidance.
Page 96

Page 97

Ref:  ABH1/2009
DEFINING A MATERIAL CONSIDERATION 
1. Legislation requires decisions on planning applications to be made in accordance
with the development plan (and, in the case of national developments, any
statement in the National Planning Framework made under section 3A (5) of the
1997 Act) unless material considerations indicate otherwise.  The House of Lord’s
judgement on City of Edinburgh Council v the Secretary of State for Scotland
(1998) provided the following interpretation.  If a proposal accords with the
development plan and there are no material considerations indicating that it should
be refused, permission should be granted.  If the proposal does not accord with
the development plan, it should be refused unless there are material
considerations indicating that it should be granted. 
2. The House of Lord’s judgement also set out the following approach to deciding an
application: 
- Identify any provisions of the development plan which are relevant to the
decision,
- Interpret them carefully, looking at the aims and objectives of the plan as well as
detailed wording of policies,
- Consider whether or not the proposal accords with the development plan.
- Identify and consider relevant material considerations for and against the
proposal, and
- Assess whether these considerations warrant a departure from the
development plan. 
3. There are two main tests in deciding whether a consideration is material and
relevant: 
- It should serve or be related to the purpose of planning.  It should therefore
relate to the development and use of land, and
- It should fairly and reasonably relate to the particular application. 
4. It is for the decision maker to decide if a consideration is material and to assess
both the weight to be attached to each material consideration and whether
individually or together they are sufficient to outweigh the development plan. 
Where development plan policies are not directly relevant to the development
proposal, material considerations will be of particular importance. 
5. The range of considerations which might be considered material in planning terms
is very wide and can only be determined in the context of each case.  Examples of
possible material considerations include: 
- Scottish Government policy, and UK Government policy on reserved matters
- The National Planning Framework
- Scottish planning policy, advice and circulars
- European policy
- A proposed strategic development plan, a proposed local development plan, or
proposed supplementary guidance
Page 97

Page 98

Ref:  ABH1/2009
- Guidance adopted by a Strategic Development Plan Authority or a planning
authority that is not supplementary guidance adopted under section 22(1) of the
1997 Act
- A National Park Plan
- The National Waste Management Plan
- Community plans
- The Environmental impact of the proposal
- The design of the proposed development and its relationship to its surroundings
- Access, provision of infrastructure and planning history of the site
- Views of statutory and other consultees
- Legitimate public concern or support expressed on relevant planning matters 
6. The planning system operates in the long term public interest.  It does not exist to
protect the interests of one person or business against the activities of another.  In
distinguishing between public and private interest, the basic question is whether
the proposal would unacceptably affect the amenity and existing use of land and
buildings which ought to be protected in the public interest, not whether owners or
occupiers of neighbouring or other existing properties would experience financial
or other loss from a particular development.
Page 98