Democracy Spraffa

Agenda pack

North Lanarkshire Council · 29 August 2022
Back to Enterprise, Growth and Fair Work Committee — 29 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Our Ref:
Your Ref:
Contact:
Tel:
Fax:
E-Mail:
Date:     
Clare Louise McDonald
01698 302028 
mcdonaldcl@northlan.gov.uk
18 Aug 2022 
Members of the
Enterprise, Growth and Fair Work Committee     
Chief Executive’s Office
Archie Aitken
Head of Legal & Democratic 
Solutions
Civic Centre, Windmillhill Street
Motherwell ML1 1AB
DX 571701, Motherwell 2
www.northlanarkshire.gov.uk      
Notice is given that a Hybrid Meeting of the ENTERPRISE, GROWTH AND FAIR WORK
COMMITTEE is to be held within the Council Chamber on Monday, 29 August 2022 at 10:00 am
which you are requested to attend. 
The agenda of business is attached.    
Head of Legal and Democratic Solutions 
Members :     Councillors: D Ashraf, A Bustard, D Crichton, P Di Mascio, K Docherty, K Duffy,
H Dunbar, J Hume, P Kelly, A Khan, G Lennon, J Logue, A Magowan, A Masterton,
F McNally, M McPake, L Mitchell, L Nolan, G Robinson, A Smith, K Stevenson,
R Sullivan, J Toner, S Watson, C Williams. 
Page 1 of 181

Page 2

Page 2 of 181

Page 3

AGENDA
(1) Declarations of Interest in terms of the Ethical Standards in Public Life Etc. (Scotland) Act
2000
OPERATIONAL
(2) City Deal Programme Update (page 7 - 16)
Submit report by the Head of Planning and Regeneration providing an update on the current
status of North Lanarkshire City Deal Infrastructure sub-projects (copy herewith)
(3) Economic Regeneration Delivery Plan and Performance Framework - Annual Progress
Update (page 17 - 52)
Submit report by the Head of Planing and Regeneration providing an update on the progress
made toward the implementation and delivery of North Lanarkshire's Economic Regeneration
Delivery Plan (ERDP) and associated Action Plan (copy herewith)
(4) Clyde Green Freeport Bid Update (page 53 - 62)
Submit report by the Head of Planning and Regeneration providing an update on a bid
submission by Glasgow City Region member authorities and private sector partners for green
freeport status (copy herewith)
(5) Business Grants - Business Recovery and Growth Fund (page 63 - 68)
Submit report by the Head of Planning and Regeneration seeking approval to increase the
maximum grant available to applicant businesses under the Back to Business Recovery and
Growth Fund scheme (copy herewith)
(6) External Funding Update (page 69 - 80)
Submit report by the Head of Planning and Regeneration providing an update on external
funding including a range of external funding opportunities available for physical regeneration
activity and work being undertaken to deliver programmes and projects (copy herewith)
(7) Employability - EU Funds Update (page 81 - 86)
Submit report by the Head of Education and Families (South) seeking approval to negotiate
an extension to the Council's EU funded programme from December 2022 to June 2023,
providing an update on the current labour market in North Lanarkshire and outlining the work
undertaken by the employability team (copy herewith)
(8) UK Shared Prosperity Fund Update (page 87 - 100)
Submit report by the Head of Planning and Regeneration providing an update on progress
and activities being undertaken to develop North Lanarkshire's Investment priorities and
interventions for the UK Shared Prosperity Fund (copy herewith)
Page 3 of 181

Page 4

2
CONTRACTS
(9) Contract Award Business Intelligence Hub (page 101 - 106)
Submit report by the Head of Business and Digital Solutions informing of action taken, under
delegated authority, to award the Contract for the Business Intellegence Hub to Agilisys
Limited (copy herewith)
(10) Contract Award Unix Support Services (page 107 - 112)
Submit report by the Head of Business and Digital advising of action taken, under delegated
authority to award the contract for Unix Support Services to Datavita Ltd to the value of
£148,145 (copy herewith)
(11) Contract Award for a Conservation Architect Design Team Framework Agreement
(page 113 - 124)
Submit report by the Head of Planning and Regeneration informing of action taken, under
delegated authority to award a Conservation Architect Design Team Framework Agreement to
four tenderers, at a maximum value of £3,000,000 (copy herewith)
(12) Contract Award Ravenscraig Multidisciplinary Project Services (page 125 - 132)
Submit report by the Head of Planning and Regeneration advising of action taken to award the
Contract for Ravenscraig Access Infrastructure North Multidisciplinary Project Services to
Amey OW Limited to the maximum value of £1,992,812 (copy herewith)
(13) Contract Award for Ravenscraig Levelling UP Fund - Professional Services for Project Team
(page 133 - 144)
Submit report by the Head of Planning and Regeneration informing of action taken, under
delegated authority, to award two contracts for Ravenscraig Levelling Up Fund for (1) Design
and Planning Services to Sweco UK Ltd at the maximum value of £523,976.31 and (2) Project
and Contract Management Services to Currie and Brown UK Ltd at the maximum value of
£320,130.76 (copy herewith)
(14) Contract Award Business and Digital (page 145 - 150)
Submit report by the Head of Business and Digital seeking approval to award two contracts for
(1) Assistive Technologies Contract to The Access Technology Company at the maximum
value of £135,000 and (2) Netcall Annual Maintenance and Support Contract to Netcall Ltd at
the maximum value of £157,604 (copy herewith)
(15) Contract Award for MTC for Fire Alarms, Smoke Alarms and Protection Systems - Services
and Maintenance (page 151 - 156)
Submit report by the Head of Business (Housing Property and Projects) advising of action
taken, under delegated authority to award a Negotiated Tender to provide a repairs and
maintenance service for fire alarm systems, sprinklers and smoke vents to Spie Scotshield
Limited, at a maximum value of £175,000 (copy herewith)
Page 4 of 181

Page 5

3
(16) Contract Award for MTC for Fire Alarm, Smoke Alarm and Protection System Service and
Maintenance in Non-Domestic Properties 2022-2026 (page 157 - 168)
Submit report by the Head of Business (Housing Property and Projects) seeking approval to
award a contract for Fire Alarm, Smoke Alarm and Protection Systems Service and
Maintenance in Non-Domestic Properties 2022-2026 to SPIE Scotshield Limited at a
maximum value of £800,000 (copy herewith)
(17) Negotiated Tender Procedure - Ventilation Works (page 169 - 174)
Submit report by the Head of Business (Housing Property and Projects) advising of action
taken, under delegated authority to award a Negotiated Tender to Mears LLP for Ventilation
Works to provide and improve ventilation in schools at the value of approximately £1,000,000
(copy herewith)
(18) Contracts Awarded Below Committee Approval Threshold (page 175 - 181)
Submit report by the Head of Asset and Procurement Solutions advising of the contracts
awarded between 1 January and 30 June 2022, with a value below the financial threshold
requiring Committee Approval (copy herewith)
Page 5 of 181

Page 6

Page 6 of 181

Page 7

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  EPT/LN Date 29/08/22 
Programme of Work PO21 - City Deal Programme Update 
From Pamela Humphries, Head of Planning and Regeneration    
E-mail Noblely@northlan.gov.uk Telephone  Lyndsay Noble,
07970016256 
1. Background 
1.1 The Glasgow City Region (GCR) City Deal is an agreement between the UK and
Scottish Governments and the eight GCR Local Authorities, with the sole focus of
creating additional economic growth.  The 20-year GCR Deal was accepted by GCR
Council Leaders on 20 August 2014 and incorporated: 
• implementing a £1.13bn Infrastructure Fund to improve the regional transport
network, regenerate sites for economic use and improve public transport
provision;
• supporting growth in the life sciences sector;
• helping small and medium enterprises to grow and develop;
• establishing programmes to support the unemployed; and 
• piloting new ways of boosting the incomes of low wage employees.   
Executive Summary 
The North Lanarkshire City Deal Programme Update report seeks to inform the Committee
of the current status of North Lanarkshire City Deal Infrastructure subprojects.     
Recommendations 
It is recommended that the Committee: 
1)   Considers the content of the report and the recent progress of North Lanarkshire
City Deal infrastructure subprojects;   
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
AGENDA ITEM 2
Page 7 of 181

Page 8

1.2 The City Deal programme for North Lanarkshire as part of the Infrastructure Fund
comprises the following projects:
• A8/M8 Corridor Access Improvements
o Eurocentral Park and Ride (To be deferred and Strategic Active Travel
to be brought forward)
o Orchard farm Roundabout
• Glenboig Link Road (complete)
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road
o Ravenscraig Access Infrastructure
o Motherwell Town Centre Transport Interchange 
2. Report 
2.1 Motherwell Town Centre Transport Interchange (MTCTI) 
2.1.1  The redevelopment of Motherwell Rail Station by ScotRail’s appointed contractor,
Balfour Beatty, is significantly underway however is experiencing delay. The new
retaining wall, which will facilitate a widened station concourse, forecourt and new retail
unit, has been completed. Work is now progressing on the station frontage and internal
concourse area. Access to the station and platforms for passengers will continue to be
maintained throughout the improvements. 
2.1.2  Balfour Beatty have also been appointed by the council to undertake the improvement
works to Muir Street comprising expansion of the bus stop; provision of a new access
road to Motherwell Rail Station with new taxi rank and public realm improvements. 
2.1.3  Both the Motherwell Rail Station and Muir Street contracts were scheduled to be
complete by July 2022.  Due to delays in delivering the station contract the works are
now expected to continue until the end of the calendar year. The council are working
with Balfour Beatty to minimise the impact of delays of the station works on the Muir
Street contract and the town centre.  It is currently projected that most of the Muir Street
works will be completed by September 2022, with the expanded bus stop, and
refurbished bus shelter reopened.  The remaining works will then be completed after
the new station roof is installed and widened station forecourt is complete. This will
allow the new station access road and taxi rank to be opened. It is aimed that all works
will be completed by early 2023. 
2.1.4  Construction access and pedestrian management arrangements are being coordinated
between the contracts, to minimise disruption. Some road closures of short duration
will be required throughout the Muir Street works to carry out some activities safely. For
each road closure, advance notification will be provided to local businesses and the
public (through signage on site, website updates and other communication channels).
Road closures will be in place at weekends to minimise disruption to the town centre.
Officers within the Enterprise Projects Team are working with the communication team
at Balfour Beatty and the Motherwell Rail Station Communications Group to ensure that
communications are coordinated across both contracts. 
2.1.5 A Community Benefits Plan has been agreed with Balfour Beatty for the contract. To
date, a number of skills, employability and training initiatives have been delivered,
including a careers event, work experience placements and mock interviews. An
initiative has been delivered with Our Lady’s High School and a commitment made to
Page 8 of 181

Page 9

support five local community projects. These projects were identified in consultation
with the Motherwell Community Board. 
2.2 Ravenscraig Access Infrastructure 
2.2.1 The Ravenscraig Access Infrastructure project comprises three projects:
• a new road connection between Motherwell and Ravenscraig from Airbles
Road, passing under the West Coast Main Line railway, and on to the Regional
Sports Facility 
• completing the dualling of Airbles Road between Airbles Farm Road and
Hamilton Road and improving facilities pedestrians and cyclists  
• upgrading the A723 for three kilometres from the New Craig Road junction at
Ravenscraig to the M8 at Holytown to create a dual carriageway and shared
footway/cycleway 
2.2.2 The project will be delivered in phases beginning with the new rail bridge for the future
connection between Motherwell and Ravenscraig. 
2.2.3 Since receiving detailed planning permission in September 2021 for the new
connection between Motherwell and Ravenscraig, Network Rail and the Council have
worked jointly to appoint a contractor to build the new bridge crossing of the railway
which concluded in February with the approval of the Full Business Case and the
contract for these works by GCR City Deal and Enterprise & Growth Committee
respectively.   
2.2.4 Since their appointment, Story Contracting have been finalising the detailed design of
the bridge and preparing the site for construction which will commence in earnest in the
summer. The new bridge will be constructed off-line and moved into place during April
2023 during a closure of the railway when the existing track will be lifted, the
embankment removed, the bridge moved into position and the embankment and track
reinstated.   
2.2.5 In preparation for the next phases of works, the project team: 
• are preparing the detailed specifications and tender documents for the
procurement of the new connection from Ravenscraig to Motherwell – the
tender will be published in September 2022 for award in 2023, and construction
of the road will start next summer following City Deal and Committee approval,
and once the bridge is fully complete;
• have issued notices for the Compulsory Purchase Order, following technical
examination by Transport Scotland, for the remaining land required for the new
connection from Ravenscraig to Motherwell – the period for objection runs until
12th August 2022;
• continue to seek to negotiate with all other owners and occupiers for the
remaining land required to deliver all parts of the Ravenscraig Infrastructure
Access project - acquisitions are reported to, and approved as required by,
Finance and Resources Committee;
• have published details of the proposals for completing the dualling of Airbles
Road and subsequently confirmed that these fall within the Council’s permitted
development rights. These proposals will be subject to statutory consultation
under Traffic Regulation and Stopping Up orders later this year; and 
• have appointed the professional team to continue developing the detailed
proposals for the dualling of the A723 from Ravenscraig to the M8 at Holytown.
This is subject to a separate report to this committee.  
Page 9 of 181

Page 10

2.3  East Airdrie Link Road (EALR) 
2.3.1  East Airdrie Link Road will provide a new strategic link between the M8 and south
Cumbernauld.  Following a detailed Stage 2 option appraisal a preferred route has been
agreed.  Feedback from Stage 2 public consultation has been reviewed and will help
inform the project moving forward. Further public consultation will take place late
Summer 22 for 6 weeks on the preferred route and on the environmental report as part
of the Strategic Environmental Appraisal.   
2.3.2 A section of the preferred route has been realigned to accommodate the proposed
Monklands Hospital replacement project.  The project team continue to liaise with NHS
Lanarkshire to ensure coordination, secure efficiencies and to maximise benefits. 
2.3.3 In line with previous approvals, the procurement for professional services to develop
and deliver the EALR including design and engineering, cost consultancy, project and
contract management together with site supervision and quality control for the preferred
route has commenced. The outcome of this procurement activity will be brought back
to Committee in line with General Contract Standing Orders.   
2.4 Orchard Farm Roundabout 
2.4.1 The ‘A8/M8 Corridor Access Improvements’ Outline Business Case (OBC) including
the Orchard Farm Roundabout has been submitted for approval to the GCR Cabinet
on 30 August 2022.  The scope of the Orchard Farm Roundabout project comprises a
financial contribution of £2m to the developer for the construction of the junction on the
A8.  The roundabout secured Planning consent in January 2020 and supporting
technical approvals including a Minute of Agreement with Transport Scotland have
been secured by the developer or are in final stages of agreement.   
2.4.2  The Orchard Farm Roundabout is a new junction on the A8 All Purpose Distributor
Road and critically supports the development of the Mossend International Rail Freight
Park (MIRP) and provides important access to a number of development sites to the
north of the A8/M8.   
2.4.3  MIRP is a low carbon rail-based infrastructure project with a significant co-located
logistic park development. Peter D Stirling Limited (railfreight terminal
operator/landowner) and Trustees of ID Meiklam (landowner) seek to develop the
Mossend Railfreight Terminal into a European scale railfreight terminal and distribution
park with all-electric facilities. MIRP is one of very few sites within the UK that can offer
integrated multi-modal logistics of this scale, quality and economic value. MIRP is 
central to the recent Clyde Green Freeport submission, which is subject to a separate
report to this committee.   
2.4.4  The OBC will be underpinned by a funding agreement between the council and the
developer and will establish funding arrangements, obligations and key milestones. 
The remainder of the costs and any associated delivery risks relating to the delivery of
the infrastructure will be met by the developer.  The infrastructure will be form part of
the strategic road network and will fall under the responsibility of Transport Scotland.   
2.4.5 A steering group comprising the developer, Scottish Enterprise and North Lanarkshire
Council was established in December 2020 to progress the case for public sector
investment, develop the city deal business cases and to steer the delivery of the wider
MRIP project of which the Orchard Farm roundabout forms an early and critical stage. 
Page 10 of 181

Page 11

2.4.6 Subject to A8/M8 Corridor Access Improvements OBC approval, it is proposed to
submit the Full Business case (FBC) for the Orchard Farm Roundabout for approval to
the GCR Chief Executive’s Group this calendar year.  Approval will be sought from the
November Enterprise, Growth and Fair Work Committee to submit the FBC to the GCR
Chief Executives Group for approval.  This would allow for works to commence in spring
2023, with the intention that the works would be complete in April 2024. 
2.5 Eurocentral Park and Ride 
2.5.1 The scope of the Eurocentral Park and Ride / Share has been under review to examine
the potential for the current scheme to be expanded from a traditional park and ride to
a Low Carbon Hub (LCH).  Consultants, Systra Ltd. were appointed in March 2021 to
undertake a 2-part STAG based feasibility study. Part One of the study has
recommended that, in light of the initial transport modelling, the future uncertainty of
traffic patterns and outstanding strategic transport initiatives/studies, that the provision
of a park and ride/low carbon hub should be deferred. 
2.5.2 An updated options appraisal for the Eurocentral sub-project has therefore been
undertaken, to assess other infrastructure options that can be delivered now to improve
sustainable transport connections to Eurocentral/Maxim Office Park and Newhouse
from surrounding local areas and the wider region. The need for sustainable transport
improvements has been identified, to remove barriers to accessing jobs at these
strategic employment locations. 
2.6  A8/M8 Corridor Strategic Active Travel 
2.6.1  The provision of Strategic Active Travel Links, connecting Eurocentral/Maxim Office
Park/Newhouse and Mossend to surrounding local communities and local rail stations
has been identified as the new preferred option for the Eurocentral sub-project.  The
Strategic Active Travel routes have been included in the A8/M8 Corridor Access
Improvements Outline Business Case.  This has been prioritised over the Park and
Ride to ensure needs can be met now and to maximise the City Deal funding.   
2.6.2 The routes identified are to the south of Eurocentral between Bellshill and Newhouse
via Holytown and to the north of Eurocentral linking Whifflet rail station with the M8
Cycle Route at Shawhead and leading to Eurocentral and Maxim Office Park. These
routes are designated as Strategic Network Routes within the North Lanarkshire Active
Travel Strategy. 
2.6.3 In total, it is aimed to deliver 10km of shared use walking and cycling routes with City
Deal investment. The routes link with other planned active travel route improvements
as part of the Ravenscraig Infrastructure Access and East Airdrie Link Road projects.
There are also opportunities to seek match funding from other external funding sources
to expand the scope of the project to connect more communities to employment
opportunities. The plan at Appendix 1 illustrates the planned direct city deal investment.   
2.6.4 Further feasibility and design work is required to develop the active travel routes.
Subject to approval of the A8/M8 Corridor Access Improvements OBC, it is planned to
appoint consultants to progress detailed design work in early 2023. It is then intended,
subject to Committee approval, to submit the sub-project Full Business Case in early
2024 and commence work on site in Spring 2024. It is expected that the work will be
completed by March 2025. 
Page 11 of 181

Page 12

3. Measures of success 
3.1  As the second largest Local Authority within the GCR, North Lanarkshire’s residents
and businesses will directly benefit from the City Deal through: 
• creation of 2,000 new workplace jobs, representing a 1.6% uplift in the future jobs
growth forecast for North Lanarkshire;
• a significant share of some 15,000 temporary construction jobs anticipated to be
generated by the development of the Infrastructure Investment Fund projects –
construction being a predominant local employment sector; 
• estimated 9.2% of North Lanarkshire working age residents having heightened
access to employment opportunities within the wider GCR area;
• additional tender opportunities as a result of GCR City Deal investment for North
Lanarkshire Business and SME’s;
• community benefits derived from all GCR City Deal contracts awarded over
£50,000; and
• a proportionate share of the £2.2bn per annum Gross Value Added (GVA) increase
in the GCR area over the lifetime of City Deal, equivalent to 4% uplift in the region. 
4. Supporting documentation 
4.1  Appendix 1 - A8/M8 Corridor Strategic Active Travel 
Pamela Humphries
Head of Planning and Regeneration 
Page 12 of 181

Page 13

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The City Deal Cabinet has agreed that Inclusive Growth is to be fully embedded
within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  Future NLC subproject
OBC/FBC development will be scrutinised to ensure it meets the duties of the Fairer
Scotland Action Plan. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☒ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The North Lanarkshire Council City Deal Programme approved funding allocation
across the 3 headline projects is as: 
• A8/M8 Corridor Access Improvements £6,478,521 
• Glenboig Link Road (complete)  £6,223,205
• Pan-Lan Orbital Transport Corridor  £215,696,493 
The City Deal funding comprises funding from the GCR City Deal Infrastructure Fund
(£148,956,293) and North Lanarkshire Council (£79,441,926). The financial
implications of the City Deal Programme are incorporated within the Council’s Long-
term Financial Plan and to date budgetary implications have been approved by the
Policy and Strategy Committee. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Page 13 of 181

Page 14

Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the Council as part of the GCR City Deal will
be subject to relevant environmental and sustainability appraisal and as part of
subsequent planning application approvals and procurement.   
Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of
project business case seeking GCR City Deal funding will include a review of the
sustainability considerations, this will include carbon management, involving
categorisation, assessment and mitigation. 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The City Deal programme and the delivery of the projects will continue to be
promoted through Corporate Communications and the Glasgow City Region’s
Communications team.   
Specific to Muir Street Improvements, a joint communications group with Scotrail,
Transport Scotland and North Lanarkshire Council has been set up to coordinate
Page 14 of 181

Page 15

communication and promote the Motherwell Station redevelopment and the City
Deal Muir Street improvements.   
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
A key risk for the City Deal Programme is the current global economic climate and its
short and long term impacts on the delivery of the city deal projects.  This risk is
becoming a live issue for the Programme and will be assessed and recorded within
the City Deal Issues Register. This is not unique to City Deal and the approach to
this risk and issue management will be carried out in conjunction with Finance and
the Glasgow City Region Project Management Office.   
Risk management of North Lanarkshire’s City Deal activity is incorporated within the
council’s City Deal programme risk register which is reviewed by the City Deal
Manager and reported to the council’s City Deal Board.  The City Deal risks are also
integrated in the Planning and Regeneration Service Risk Register.  Each City Deal
sub project has a detail risk register and is managed by the Project Manager.   
Page 15 of 181

Page 16

Appendix 1 – A8/M8 Corridor Strategic Active Travel 
Page 16 of 181

Page 17

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  ERDP/MH Date 29/08/22 
Programme of Work PO18.1 (2) – Economic Regeneration
Delivery Plan and Performance Framework – Annual Progress
Updates 
From  Pamela Humphries, Head of Planning and Regeneration  
E-mail hyndsm@northlan.gov.uk Telephone 
Mark Hynds, 
Economic Analyst – 
07583 023248 
Executive Summary 
The purpose of this report is to update committee on the progress being made towards the
implementation and delivery of North Lanarkshire’s Economic Regeneration Delivery Plan
(ERDP) and associated Action Plan. The Action Plan is updated annually, and this
progress report details activity as at financial year end 2021/22. 
This report also presents the final draft of the ERDP Performance Framework which will
now be used to monitor wider ERDP performance over the short (2021/22), medium (end
of current ERDP 2023) and long term (2035). Unlike the ERDP Action Plan, figures within
the Performance Framework are reported on a cumulative basis to show the progress
against the longer-term ambitions of the ERDP. 
Recommendations 
It is recommended that the committee: 
1) Acknowledge the content of this report and progress made towards the delivery of
the 2021/22 ERDP Action Plan approved by Enterprise and Growth Committee in
February 2021 (as detailed in Appendix 1). 
2) Acknowledge the wider progress and performance against the current ERDP
(2019-2023) and future ERDP activity (as detailed in Appendix 2).  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
AGENDA ITEM 3
Page 17 of 181

Page 18

1. Background 
1.1 The Economic Regeneration Delivery Plan (ERDP), approved by the Enterprise &
Growth Committee in August 2019, aims to help co-ordinate physical and economic
regeneration activity across North Lanarkshire, increase economic output and help
address social and economic inequality. 
1.2 An Action Plan to support the delivery of the ERDP through a range of key measures
and investment programmes was also approved by committee at this time and it was
agreed that this Action Plan would be updated on an annual basis to reflect progress
made to date and the evolving priorities of the council. 
1.3 The 2021/22 Action Plan was approved by Enterprise and Growth Committee in
February 2021 and the current 2022/23 Action Plan was approved in February 2022. 
1.4 An accompanying ERDP Performance Framework was developed and approved by
Enterprise and Growth Committee in February 2021. This comprises of a group of
performance indicators at three levels. These indicators aim to collectively provide an
overview of how the North Lanarkshire economy is performing as well as helping us to
understand the impact that the delivery of the ERDP is having on improving economic
opportunities and outcomes for all.
1.5 The ERDP Framework is consistent with The Plan for North Lanarkshire’s Strategic
Performance Framework 
2. Report 
2.1 ERDP 
2.1.1  North Lanarkshire’s 2019-2023 ERDP sets out the council’s plans for inclusive
economic growth. Overall, the ERDP has four integrated core objectives. These are to: 
• increase housing supply across all tenures to meet our current and future
housing requirements and support our wider regeneration objectives; 
• support the regeneration of our town centres through the development of long-
term Vision Plans and strategic projects; 
• develop our strategic infrastructure to support the physical and economic
regeneration of North Lanarkshire; and 
• enable and promote the provision of good quality industrial and office space in
the right locations to help attract and retain businesses and improve our
economic output. 
2.1.2  To support the delivery of these objectives, annual ERDP Action Plans has been
developed each financial year so far.
2.2  Action Plan – Performance Review 
2.2.1  Appendix 1 provides an update on the ERDP Action Plan objectives and targets
achieved during 2021/22. 
2.2.2  As demonstrated by this update, good progress has been made during 2021/22 against
targets with highlights including: 
• the delivery of an additional 212 new affordable homes via the New Supply
Programme, taking completions to 1,494 on 31 March 2022; 
Page 18 of 181

Page 19

• the final Town Visions, which set out the overarching strategy for development
within our town centres, were developed and approved by the Policy and
Strategy Committee in September 2021;  
• £5.58m external investment secured (by NLC and Fusion Assets) for industrial
and business use;  
• 14 new industrial units constructed at Orbiston Street, Motherwell with one unit
going to New College Lanarkshire as part of an entrepreneurial start up scheme; 
• £1.8m Scottish Government Regeneration Capital Grant Fund (RCGF) funding
secured for the construction of start-up units, upgrading of existing NLP units
and infrastructure improvements throughout Braidhurst Industrial Estate; 
• contractors appointed and works commenced on site to improve Motherwell
Town Centre transport interchange to support active and sustainable travel;
• Commsworld appointed to deliver connectivity services for the council and to
deliver enhanced connectivity outcomes across North Lanarkshire for residents
and businesses; and
• significant progress made on the delivery of key infrastructure projects such as
the Ravenscraig Access Infrastructure being developed as part of the City Deal
Programme. 
2.3  The ERDP Performance Framework also highlights significant progress in improving
economic opportunities and outcomes for North Lanarkshire’s residents and
businesses with highlights, at 31 March 2022, including:
• 457 homes brought into council ownership via the Open Market Purchase
Scheme, including some homes previously sold under the Right to Buy
• A total of £66m invested in town centre (including edge of town) developments,
with £30.5m external funding secured as part of this investment. Town centre
sites repurposed and redeveloped include: 
o The creation of community allotments at Hillrigg, via funding through the
Scottish Government’s Vacant and Derelict Land Fund and Place Based
Investment Programme funds.
o A new 2.3km green route, enabling people to walk and cycle across
Cumbernauld. The path runs from Abronhill to the town centre, connecting
local communities with local facilities
o 1,372 new affordable town centre homes completed (including edge of town
sites) via NLC and Registered Social Landlords (RSLs). This includes 16
new affordable homes at Roberts Street (Belhaven House), Wishaw and 27
new homes at Caledonian Avenue, Bellshill. 
o 69,910 sq. ft of commercial workspace created or refurbished as a result of
investment by NLC, Fusion Assets and NLP across North Lanarkshire 
3. Measures of success 
3.1  The annual ERDP Action Plan contains various delivery targets. This report provides
an end year update on the targets set within the 2021/22 action plan. A series of targets
are also contained within the current 2022/23 action plan which was approved by
committee in February 2022.
3.2 A robust ERDP Performance Framework has now been established and contains a
series of key performance indicators, with short, medium, and long-term targets
attached as the operational measures of success.   
Page 19 of 181

Page 20

4. Supporting documentation 
Appendix 1 Economic Regeneration Delivery Plan – 2021/22 Action Plan - End
Year Updates
Appendix 2 Economic Regeneration Delivery Plan Performance Framework –
2020/21 End Year Update 
Pamela Humphries
Head of Planning and Regeneration 
Page 20 of 181

Page 21

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
Page 21 of 181

Page 22

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Risks are recorded and managed within Corporate Risk Register. 
Key risk is failure to deliver on ERDP and its objectives of helping co-ordinate
physical and economic regeneration activity across North Lanarkshire, increasing
economic output and helping address social and economic inequality. This would
result in economic and social benefits to residents and business across North
Lanarkshire and significant reputational damage to the Council given the widespread
public nature of the programme. 
Page 22 of 181

Page 23

Page 23 of 181

Page 24

Appendix 1: Economic Regeneration Delivery Plan – 2021/22 Action Plan - End Year Updates
Theme: Live
Priority 1: We will help deliver the homes North Lanarkshire needs to grow
Key Action Milestone Target Update RAG
Ensure our
future housing
mix supports
social inclusion
and economic
growth
Deliver the New Supply
Programme
2021/22 – 300 new council homes
(including Open Market Purchase Scheme
(OMPS)) 
2035 – 5,000 new council homes (including
OMPS)
212 new council homes completed during 2021/22 
As at end of 2021/22, 1,494 new council homes
completed (including OMPS). A further 363 homes
are currently under construction.
A
Enable the private sector
to support the delivery of
the New Supply
Programme 
2023 - Progress delivery of acquisitions of
new build housing from the private sector
through the Development Pathfinder
approach and other partnership
arrangements
Orrs project in Airdrie now on site (20 homes). 
In discussion at a number of locations for further
off-the-shelf purchases.
G
Prepare and support the
delivery of the Strategic
Housing Investment Plan
(SHIP)
Annual - Annual SHIP prepared which
identifies suitable deliverable sites to meet
Local Housing Strategy priorities and
maximise the use of available Scottish
Government investment
SHIP formally approved in February 2022. 
Scottish Gov Outturn Report for 21/22 to be
published in Q3 22/23. 
SHIP (2023/24 - 2027/28) currently being
developed. Due for submission in October 2022.
G
Ensure our
homes are
sustainable,
digitally
connected and
fit for purpose
Develop demonstrator
projects which support
the council’s ambition for
digitally connected and
carbon neutral living
2023 - Develop interactive smart home
standard for use in new build homes
In progress - due to complete by March 2023. G
Develop and implement pilot approach for
‘Low Carbon Living’ at Holehills
development
Project currently on site in Airdrie - 19 homes
designed to achieve net zero.
G
Page 24 of 181

Page 25

Theme: Invest
Priority 2: We will reshape and repopulate our town centres
Key Action Milestone Target Update RAG
Develop and
deliver
aspirational
visions for
the future of
each of our
town centres
Develop town centre
vision plans
2021 - Finalise the development of town
centre vision plans in consultation with key
stakeholders and communities
The final Town Visions were presented to and
approved by the Policy and Strategy Committee in
September 2021. The visions are available on the
NLC website and set the overarching strategy for
development within our town centres.
G
Progress the
development of Action
Plans for each of our
town centres (to support
the delivery of the
Visions and guide
strategic investment and
development across our
towns)
2022 - Complete and seek approval for a
minimum of one town centre action plan
(subsequently rolling out agreed format
across remaining seven town centres)
To reflect corporate priorities and staff resources it
has been agreed to proceed with four Town Action
Plans (TAPs) in this financial year (2022/23), with
TAPs for Cumbernauld, Airdrie, Motherwell, and
Wishaw. 
Briefings for elected members are scheduled for
August 2022 with the draft TAP’s being co-
developed with the local community through a
series of workshops in each of the four towns
between August and October 2022. 
The draft TAPs will then be published for open
public engagement and consultation in November
2022. It is hoped to present a completed TAP to the
first cycle of committees in 2023.
A
Develop a sense
of place by
protecting,
repurposing, or
redeveloping
vacant, derelict,
or unused
priority
buildings and
sites within our
town centres
and investing in
town centre
regeneration
activity that will
Develop and implement
plans to repurpose or
redevelop vacant,
derelict, or unused
priority buildings and
sites within our town
centres 
2022 - Develop options for the delivery of
seven priority town centre projects to
ensure NLC have ‘shovel ready’ projects
that can help secure Scottish Government
planned investment for ‘Town Centres’ and
‘Place’ over the next 5 years as outlined
within Scotland’s Infrastructure Investment
Plan (2020). 
These pipeline projects will include:
• Main Street (Coatbridge)
• Airdrie Town House
• Bellshill FSS, Registry Office & Money
Advice Centre
• Kings house (Wishaw)
• Progressing design options for Main Street.
• Completed feasibility for Airdrie Town House. 
• Bellshill feasibility complete and currently doing
further survey works.
• Kings House and Methodist church demolitions
complete in preparation for construction works.
• Acquired the former Masonic Hall, Motherwell
and currently considering options for the
redevelopment of this site. 
• Acquired the Thornlie Church Hall, Wishaw and
currently exploring redevelopment options at
this site.
• Identified/Progressing with other sites
(negotiations with owners and design works)
G
Page 25 of 181

Page 26

support the
delivery of the
town visions 
• Former Methodist Church (Wishaw)
• Two identified key sites in Wishaw and
Motherwell Town Centres (not currently in
NLC ownership)
2023 - 630 new town centre homes
completed via Affordable Housing Supply
Programme (2019/20 to 2022/23)
Progress continues with 485 town centre homes
(including edge of town) delivered between 2019/20
and 2021/22. This includes via the New Supply
Programme and via RSL’s.
G
Ensure our
investment in
town centres
contribute
to the council’s
ambitions for
carbon
reduction and
digital
connectivity
Integrate, where
possible, town centre
developments as part of
the council’s digital
anchor tenant model
2022 - Identify where possible potential
anchor tenant properties within each town
centre
As part of the council’s digital connectivity strategy
and the associated connectivity framework awarded
to Commsworld, the initial focus of the first
18months (from Feb22) is the implementation of a
new council wide area network (WAN), which
basically connects required council buildings and
sites onto this new fibre infrastructure.  Delivered
over this will be the single Public Wi-Fi service, that
will incorporate Town Centres and any public use
buildings and spaces that are deemed to require it. 
Town centres currently benefit from a public Wi-Fi
service, and this will continue to be used as the
work on the WAN is prioritised over the next
12months and then subsequently replaced with the
new modern single service shortly thereafter. 
R
Incorporate digital
infrastructure as part of
town centre projects 
2022 - Incorporate the provision of digital
infrastructure within all design and works
tenders for town centre active travel
projects
The Enterprise Projects/City Deal team will be
working with the digital team to explore how digital
infrastructure can be incorporated into current and
future active travel projects. 
G
Develop a town centre
EV charging
demonstrator project that
can be rolled out across
our town centres
2022 - Take forward a full application to the
Scottish Government’s Switched on Towns
& Cities Fund (subject to the continuation of
this grant programme)
This fund has not reopened since 2019/20 and
therefore an application has not been submitted. 
However, NLC is currently working regionally to
develop an EV charging strategy for the Glasgow
City Region. Each local authority was awarded
£60k to produce a new strategy and this has been
pooled across the region. The strategy is likely to
be submitted to Transport Scotland in late 2022. 
R
Page 26 of 181

Page 27

The EV charging strategy will enable access to a
£30m fund over the next four years with the aim to
reduce dependency on Government Funding and
increase private investment and commercially
operated EV charging.
Support the
delivery
of North
Lanarkshire’s
Active Travel
Strategy
Progress the
development and
delivery of ‘Local
Neighbourhood Active
Travel Routes’ and
proposals for ’20 Minute
Neighbourhoods’
2023 - Design and develop Local
Neighbourhood Active Travel Routes
(supporting anticipated investment of £1.3m
for the upgrade/creation of an anticipated
6km of key town centre routes by 2023)
Ravenscraig Active Travel Link Phase 2 due to
commence on site Autumn 2022, completion
projected by May/June 2023. Investment estimated
at circa £1.4M. 
Motherwell Station Active Travel Links Phase 1 to
be delivered by Summer 2023 with investment
estimated at circa £850k.
G
Theme: Work
Priority 3: We will enable our people and businesses to thrive
Key Action Milestone Target Update RAG
Maximise the
use of our
marketable land
and assets
through the
development of
business and
industrial
infrastructure
Improve the provision of
high-quality business
and industrial space
either directly or through
our ALEOs and Joint
Ventures
2023 - NLC investment of a minimum of
£2m for key business and industrial
infrastructure projects between 2021/22 and
2022/23
£0.81m invested in 2021/22 including the
construction of 14 new industrial units at Orbiston
Street, Motherwell. 
The redevelopment of Braidhurst industrial estate
will commence in 2022/23. 
G
2023 - 2.5ha of land improved or developed
(by NLC/NLC ALEO) for industrial or
business use between 2021/22 and
2022/23   
2021/22 - 0.46ha improved or developed 
It is anticipated that Fusion Assets will improve or
develop 3.69ha in 2022/23, relating to Gartcosh
Phase 3 and Phase 4. 
G
2023 - £5.5m external investment secured
(by NLC/NLC ALEO) for business and
industrial infrastructure between 2021/22
and 2022/23  
2021/22 - £5.58m secured 
This includes £1.74m Scottish Government RCGF
funding for Orbiston Street and £3.848m secured
by Fusion Assets and invested at Gartcosh.
A further £1.8m has been secured via the Scottish
Government’s RCGF for Braidhurst industrial
estate. It is anticipated that this will be spent during
2022/23 and 2023/24. 
G
Page 27 of 181

Page 28

2023 - 64,000sq. ft of new business and
industrial workspace completed (by
NLC/NLC ALEO) between 2021/22 and
2022/23
2021/22 - 51,910 sq. ft of new business and
industrial workspace completed 
This includes 40,500 sq. ft at Gartcosh (buildings 2
& 3) and 11,410 sq. ft at Orbiston Street,
Motherwell. 
A further 47,500 sq. ft at Newhouse is due to be
completed during 2022/23.
G
Enable private sector
investment for business
and industrial
infrastructure
2023 - Work with Fusion Assets to procure
joint venture private sector investment
partners for a minimum of two new
industrial/office developments 
1 joint venture is currently agreed but subject to
funding the other was delivered via a Development
Agreement incorporating land sale and profit share
arrangement rather than JV.
G
Ongoing - Ensure a pipeline of
industrial/office development projects is in
place for making use of NLC’s annual VDLF
allocation for enabling works   
Projects at Phase 3 & 4 at Gartcosh underway plus
projects at Gartcosh identified with possible future
phases. Other development projects identified by
Fusion subject to funding being available.
G
2022 - Explore options for alternative capital
investment required to support enabling
works delivered through Fusion Assets to
avoid their over-reliance on the need for
VDLF support (which remains subject to
inclusion within the Scottish Government’s
annual Financial Settlement)
Fusion have entered into discussions with Scottish
National Investment Bank as well as a number of
alternative lenders with regards to loan finance for
developments. These discussions relate to existing
portfolio of projects rather than future pipeline.
G
2022 - Develop the business case required
to support the capital investment required to
assist Fusion Assets to accelerate
industrial/office construction works through
JV partnerships
Initial Project Brief prepared for capital grant to
Fusion Assets to inject further capital funding. 
Although a business case has been developed, the
funding has been put on hold due to other priorities
in town centres. This is subject to future funding
availability. 
A
Page 28 of 181

Page 29

Ensure our
investment
activities deliver
inclusive growth
Support investment in
local business
infrastructure that will
support the growth of
micro-businesses and
SMEs (particularly within
recognised areas of
need) 
2021 - Complete the construction of 14
industrial start-up incubator units at
Orbiston Street Industrial Estate in
partnership with NLP
14 new industrial units were complete and became
operational in November 2021. One unit has been
provided to New College Lanarkshire as part of an
entrepreneurial start up scheme.
G
2023 - Deliver a regeneration scheme for
Braidhurst Industrial Estate that can be
used as a demonstrator project which can
be rolled out for the renewal of older/edge
of town industrial estates across North
Lanarkshire
NLC has been awarded £1.8m via the Scottish
Government's Regeneration Capital Grant Fund.
Alongside additional contributions from NLC and
NLP, new start-up units will be constructed on a
parcel of vacant and derelict land alongside the
upgrading and refurbishment of NLP owned units
and infrastructure improvements throughout the
estate.
G
Ongoing - Ensure that NLC retain a pipeline
of ‘shovel ready’ community-based
business and industry projects that can
meet the spend criteria and timescales of
community based external funding
programmes such as the Scottish
Government’s Regeneration Capital Grant
Fund scheme.  
Potential funding bid in pipeline by Fusion subject
to Ravenscraig acquisition. 
£5m allocated towards the redevelopment of
Braidhurst Industrial Estate. This includes the
£1.8M Scottish Government Regeneration Capital
Grant Fund (RCGF) funding secured and will
include the refurbishment of six existing small units
and the construction of 10 new start up industrial
units.
G
Support investment in
infrastructure to ensure
that key business
locations are digitally
connected and that jobs
are accessible to local
communities 
Ongoing - Incorporate the provision of
digital infrastructure for all design and works
tenders for business and industrial
development  
As part of the development of new industrial units
and wider site upgrades to Braidhurst industrial
estate, new infrastructure will be installed to ensure
that businesses can connect to high-speed
broadband. Works will commence in 2023. 
This project will realise Braidhurst’s potential as
well as acting as a demonstrator project for the
modernisation of similar small-scale industrial
estates across North Lanarkshire.
G
Support investment in
infrastructure that will
2022 - Undertake feasibility works for the
development of a ‘Construction Academy’
that will be used to support the construction
An options appraisal is currently being undertaken
on the establishment of a construction academy.
This is due to be complete September 2022.
G
Page 29 of 181

Page 30

support training and up-
skilling
related employment and training
opportunities to be provided through the
ESCP  
Theme: Invest
Priority 4: We will connect North Lanarkshire
Key Action Milestone Target Update RAG
Deliver the City
Deal Programme
Develop Ravenscraig
Access Infrastructure to
support the
redevelopment of
Ravenscraig and
connect the M74 to M8
as part of Pan
Lanarkshire Transport
Corridor
2022 - Final approval (by City Deal Board)
and works commence 
2025 – Project completion 
2021/22 - Project Development stage - design and
enabling works progressed 
FBC for the West Coast Mainline Crossing
approved. WCML works on site. Tender for
Motherwell to Ravenscraig works to be issued
Autumn 2022.
G
Construct East Airdrie
Link Road as a key
North South route as
part of the Pan
Lanarkshire Transport
Corridor
2023 - Commencement of procurement for
main works contractor 
2024 – Final approval (by City Deal Board)
and works commence 
2025 – Project completion
GI contract works complete. 
Preferred Option selected. Tender for Stage 3
consultants to be issued in Q2 22/23. OBC
submission now 2023. Works to commence 2025.
G
Improve Motherwell
Town Centre transport
interchange to support
active and sustainable
travel
2021 - Completion of station works 
2021 - Procurement of forecourt/Main Street
works 
2022 – Completion of works
Contractor (Balfour Beatty) appointed and works
commenced on site. 
Works are underway on site however there have
been delays to progress. Completion currently
projected for Q4 22/23, subject to ongoing
discussions with the contractor and ScotRail.
A
Contribute to the
installation of Orchard
Farm roundabout to
support development on
the A8/M8
2021 - Outline Business Case to be
submitted to the City Deal Cabinet
Project development stage - stakeholder/ partner
engagement 
Outline Business Case submitted to City Deal PMO
in June 22 for approval by Cabinet in August 22
G
Develop Eurocentral
Park & Ride to improve
A8/M8 corridor access
and support local
business opportunities
2021 - Outline Business Case to be
submitted to the City Deal Cabinet
Eurocentral Transport Study completed. 
Revised preferred option selected (Strategic Active
Travel routes). Revised Outline Business Case
G
Page 30 of 181

Page 31

submitted to City Deal PMO in June 22 for approval
by Cabinet in August 22
Ensure our
investment
infrastructure
contributes to
the council’s
ambitions for
carbon
reduction
Support the delivery of
EV infrastructure across
North Lanarkshire and at
key transport locations
2021 - Establish a NLC officer working
group to co-ordinate the development of
an EV Charging Strategy for North
Lanarkshire
NLC officer working group established, chaired by
Roads and Land Maintenance Manager. 
G
2021 - Review delivery of EV charging
provided through Project PACE to help
support delivery of future EV charging
Strategy and roll-out
It is intended that a progress update on project
PACE will be issued to committee in November
2022. 
G
2021 - Complete feasibility works for the
development of a low-carbon EV
charging hub at Eurocentral Park &
Ride
Part 1 of feasibility study complete. 
Further project development work has been
deferred due to current low demand projections
from Part 1 modelling. 
Subject to the NLC City Deal A8/M8 Corridor
Access Improvements OBC approval by GCR
Cabinet it is intended to bring forward Strategic
Active Travel proposals connecting Coatbridge and
Bellshill with Maxim, Eurocentral and Newhouse. 
Development work will take place over 2022/23 and
2023/24.  
A
Deliver a world-class
digital infrastructure
across North
Lanarkshire
2021/22 - Procure a long-term connectivity
delivery partner to provide connectivity
services for the council and to deliver
enhanced connectivity outcomes
across North Lanarkshire for residents
and businesses
Commsworld Ltd were appointed to deliver
connectivity services in February 2022. 
Work in underway to mobilise the call-off contracts
within the framework.
G
2021/22 - Develop pilot schemes as part of
the procurement in areas such as Smart
Business, Smart Homes, Smart Park,
Smart Streets
Four Proof-of-Concepts proposals were submitted
as part of the tender proposal. These Proof-of-
Concept proposals are currently being reviewed. 
G
Page 31 of 181

Page 32

Appendix 2 
Economic Regeneration Delivery Plan (ERDP)
Performance Framework 
Version 2: July 2022 
Page 32 of 181

Page 33

Introduction 
Improving economic regeneration plays a significant part
in our shared ambition to make North Lanarkshire the
place to live, learn, work, invest and visit.
The Economic Regeneration Delivery Plan (ERDP) sets out
how we will improve economic opportunities and
outcomes for everyone in North Lanarkshire. This includes
delivering new homes, reshaping town centres, attracting
investment and jobs. Our investments will benefit
everyone who lives, learns, invests and visits within North
Lanarkshire.
An ERDP Action Plan is updated annually and focuses on
our key objectives and day-to-day activities in delivering
the longer-term vision set out within the ERDP and The
Plan for North Lanarkshire.
The ERDP Performance Framework comprises a set of
performance indicators at three levels. These indicators
aim to collectively provide an overview of performance
that helps us to understand the impact of our work on
improving economic opportunities and outcomes for all.
Given the shared ambition set out within The Plan for
North Lanarkshire, the ERDP Performance Framework is
closely aligned to the corporate Strategic Performance
Framework.
This framework aims to produce evidence that allows for
day-to-day activities, and progress towards improving
economic opportunities and outcomes for all to be
regularly monitored, reported, assessed, and scrutinised. 
It will also enable performance issues against the ERDP’s
key priorities to be identified and addressed, mitigating the
risk of delivery failure.
The ERDP Performance Framework will be kept under
review to ensure arrangements remain effective and
aligned to future versions of the ERDP and The Plan for
North Lanarkshire.
Page 33 of 181

Page 34

ERDP Performance Framework
The three levels of performance indicators form an interrelated set, with operational measures supporting improvements to services and outcomes for
North Lanarkshire’s residents and businesses in the short, medium, and long-term.
The three levels are summarised below:
• The North Lanarkshire Economic Context
A suite of ‘state of the nation’ health check indicators which collectively provide the North Lanarkshire economic context.
These indicators are often at a macro level and out with the sole control of the Council. As such, these indicators do not have targets set against
them, instead they set out the intended direction of travel. This approach is consistent with The Plan for North Lanarkshire Strategic Performance
Framework. The ERDP framework uses 5 of the 28 indicators set out in the Strategic Performance Framework to assess the performance of the
North Lanarkshire economy.
Data comes from national sources such as the Office for National Statistics (ONS) or Scottish Local Authority Economic Development (SLAED)
Performance Reports. As data is reported in a consistent manner nationally, North Lanarkshire can be benchmarked against Scotland and
comparator authorities across the Glasgow City Region.
• Improving economic opportunities and outcomes for all
A suite of indicators and information to enable an assessment of progress towards our long-term vision of improving economic opportunities and
outcomes for all. 
When measuring outcomes there is often a delay in being able to demonstrate that outcomes have been achieved, or it may not be clear how much
of a change in an outcome can be attributed to NLC’s actions alone, or if external factors have influenced the outcome. Therefore, some of these
indicators do not have targets set against them but will instead be used for benchmarking purposes.
The group of performance indicators at all three levels in the ERDP Performance Framework therefore aims to collectively demonstrate
improvements to outcomes in the long-term, while demonstrating effective use of resources in the short term. 
• Day to day operations
These performance indicators allow the quality, efficiency, and effectiveness of day-to-day operations to be assessed.  They include targets in the
short term (2021/22 financial year), by the end of the current ERDP cycle (2022/23) and longer-term (2035). Targets are cumulative from the
Page 34 of 181

Page 35

baseline onwards (not additional to previous target). For example, the 1,400 Open Market Purchase Scheme completions by 2035 includes the 689
completions which have been targeted by 2023. Relevant teams across Enterprise & Communities are identified against each indicator to ensure
accountability. 
The inclusion of input and output measures, and understanding how these lead to improved outcomes, will be an important factor in determining
the success of the Framework and Economic Regeneration Delivery Plan. 
ERDP Performance Framework: Level 1
The North Lanarkshire Economic Context 
Indicator Baseline  Latest
available
update
Measuring this
indicator will tell us
if we have
What success looks
like
Intended
direction
of travel
North Lanarkshire Commentary
Growth in Gross
Value Added
(GVA) 
(income
approach)
2016 
NL
+3.7% 
Scotland
+3.2%
2020 
NL
+0.3% 
Scotland
-2.6% 
Increased our
economic output
Continued
economic growth
in this area 
The latest data published shows that GVA
growth remains positive in NL suggesting the
economy continues to improve.  This is in
comparison to a decline in growth nationally
over the same period. 
The 0.3% increase in NL does however
reflect the pre-pandemic period where there
was strong economic growth; these figures
do not yet reflect the impact of the
pandemic and, as such, will continue to be
monitored. 
Looking at regional GVA balanced by
industry at current prices NL has seen a rise
from £8,054 million in 2019 to a provisional
£8,076 million in 2020, which reflects
growth of 0.3%.
Page 35 of 181

Page 36

Indicator Baseline  Latest
available
update
Measuring this
indicator will tell us
if we have
What success looks
like
Intended
direction
of travel
North Lanarkshire Commentary
Gross weekly pay
(residents) – full
time employees
2018 
NL
£548.90  
Scotland
£562.70
2021 
NL
£597.60  
Scotland
£622.00 
Increased the
earnings of people
who live in North
Lanarkshire.
Earnings for people
who live in NL
continue to grow
on a par with
national levels. 
While wages have risen steadily for the
people who live in NL, this has been at a
lesser rate than average earnings for
Scotland and GB. 
The gap between NL and Scotland earnings
dropped from £20.80 per week in 2002 to
£9.90 per week in 2019. 
However 2020 figures show this gap had
increased to £14.50 per week, and 2021
figures show this gap has increased to
£24.40 per week.
% of all people
economically
active in
employment (16-
64 years)
Oct
2017/Sept
2018 
NL
77.8%  
Scotland
77.6%
Jan to Dec
2021 
NL
71.1%  
Scotland
76.2%
Increased the
number of our
residents in
employment (or
actively seeking
employment)
More people aged
16 to 64 living in NL
are economically
active and
contributing to the
local / national
economy 
After a period of relative stability, the
proportion of the working age population
who are economically active in NL started to
show a decline as at September 2020 and
this has continued to and is reflected in the
latest annual figure for 2021.  National
figures show the beginnings of an increase
from September 2021.  At the time this
suggested the figures were starting to show
the impact of the COVID-19 pandemic. 
The figure at September 2021 showed a
small encouraging increase to 71.3%. 
However the overall annual figure has
settled at 71.1%. Data is published quarterly
for this measure and will continue to be
Page 36 of 181

Page 37

Indicator Baseline  Latest
available
update
Measuring this
indicator will tell us
if we have
What success looks
like
Intended
direction
of travel
North Lanarkshire Commentary
monitored to see if this upward trend
continues.   
The upward trend in this indicator provides
an interesting narrative when considered
alongside the downward trend in the % of
working age people claiming benefits 
% of VAT/PAYE
registered
businesses that
survive for at least
three years
2016 
NL
58.7%   
Scotland
62.1%
2020 
NL
50.9%   
Scotland
55.9%
Increased and
sustained our new
businesses
More locally
generated and
incoming
businesses being
created, surviving
and sustaining in
the longer-term. 
Business survival rates in NL had picked up
in 2019 after a decline in 2018.   
However, this requires to be considered
within the context of self-employment rates. 
This shows a drop in the % of NL residents in
self-employment from 6.8% in 2014 to 3.7%
in 2021.  This mirrors (albeit to a greater
extent) the national trend for the most
recent 2 years of data, where rates
decreased from 8% in 2014 to 7.5% in 2021. 
These figures don’t yet fully reflect the
impact of the pandemic and, as such, will
continue to be monitored.
% of working age
people (16-64)
claiming one or
more of the key
benefits
Dec 2018 
NL
3.6%  
Scotland
2.8%
Jun 2022 
NL
3.6% 
Scotland
3.2%
Reduced the
number of our
residents reliant
on employment
related benefits
All of NLs residents
capable of working
are sustaining
employment. 
From a baseline of 3.6% in 2018, figures for
NL have shown a year on year increase up to
5.5% in August 2021.  This is in line with the
national trend, and at this time it was
expected that figures were starting to show
the impact of the pandemic as the NL
claimant count was 45% higher than March
Page 37 of 181

Page 38

Indicator Baseline  Latest
available
update
Measuring this
indicator will tell us
if we have
What success looks
like
Intended
direction
of travel
North Lanarkshire Commentary   
2020 (pre-pandemic level). 
However, the latest figures as at June 2022
show a continued small and encouraging
decrease, with 3.6% of the working age
people now claiming one or more of the key
benefits.  Data is published quarterly for this
measure and will continue to be monitored
to see if this downward trend continues. 
The downward trend in this indicator
provides an interesting narrative when
considered alongside the trend in the % of
all people economically active. 
Page 38 of 181

Page 39

ERDP Performance Framework: Level 2
Improving economic opportunities and outcomes for all 
Key Performance
Indicator
What does this tell us? Baseline Short term 
(By 31 March 2022)
Medium
term - 
ERDP Review
(By 31 March
2023)
Long term
(By 31 March
2035)
Target Actual Target Target
Estimated number of
gross construction
jobs (PYEs) created
The number of gross construction jobs (PYEs)
created as a result of ERDP related investment
by NLC and our ALEOs across North Lanarkshire. 
Construction jobs created as a result of physical
regeneration projects occur during the
construction phase of the project only and do
not recur once the development is operational.
Therefore, these figures are reported as Person
Year Equivalents (PYEs) rather than Full-time
Equivalents (FTEs). 
563  1,011 1,040 
Green
1,543  6,497 
Estimated number of
gross full-time
equivalents (FTEs)
created
The estimated number of gross jobs (FTEs)
created as a result of ERDP related investment
by NLC and our ALEOs across North Lanarkshire. 
The gross number of jobs created does not take
account of factors such as displacement. 
This measures the follow on impact generated
once the physical works have been completed
and the new infrastructure is being put to
economic use. 
As these outcomes only occur once projects
are operational, there will be a delay in
demonstrating this outcome has been
achieved. Therefore, this indicator has a
long-term target to 2035 only. 
This indicator is
currently under
development to
ensure a robust
methodology
for target
setting and
reporting
progress
towards this.
Page 39 of 181

Page 40

Key Performance
Indicator
What does this tell us? Baseline Short term 
(By 31 March 2022)
Medium
term - 
ERDP Review
(By 31 March
2023)
Long term
(By 31 March
2035)
Target Actual Target Target
Estimated number of
net additional full-
time equivalents
(FTEs) created
The estimated number of net jobs (FTEs)
created as a result of ERDP related investment
by NLC and our ALEOs across North Lanarkshire. 
Under this measure, the gross number of jobs
created is adjusted to better assess the true
extent of the likely impact of the ERDP on the
local labour market and economy. 
This measures the follow-on impact generated
once the physical works have been completed
and the new infrastructure is being put to
economic use. 
As these outcomes only occur once projects
are operational, there will be a delay in
demonstrating this outcome has been
achieved. Therefore, this indicator has a
long-term target to 2035 only. 
This indicator is
currently under
development to
ensure a robust
methodology
for target
setting and
reporting
progress
towards this.
Number of training
places created
The number of training places created via
community benefit clauses as a result of
investment in physical infrastructure contracts
awarded by NLC and our ALEOs across North
Lanarkshire. 
This indicator is currently under development to ensure a
robust methodology for target setting and reporting progress
towards this. 
Town centre vacancy
rates - % of vacant
commercial units as
a % of total units
across North
Lanarkshire’s town
centres.
This indicator measures the level of vacant units
within town centres. The ERDP aims to create
vibrant mixed-use towns where people live,
work, shop, eat, and access local services. As
such, recognition needs to be given to the fact
that vacancies may temporarily increase where
vacant possession of redundant retail centres or
land assembly is required to enable
transformative change.
18.9% 
Year:
2017/18
This measure will be used for benchmarking purposes only and
therefore no targets have been set. 
2020/21 - Latest published data shows that North
Lanarkshire’s town centre vacancy rate was 18.7%, above the
Scottish average of 9.2%. 
Page 40 of 181

Page 41

Key Performance
Indicator
What does this tell us? Baseline Short term 
(By 31 March 2022)
Medium
term - 
ERDP Review
(By 31 March
2023)
Long term
(By 31 March
2035)
Target Actual Target Target
% of immediately
available
employment land
The purpose of this measure is to contribute to
the assessment of how ‘investor ready’ North
Lanarkshire is in terms of providing the
necessary infrastructure for new and growing
businesses, including inward investment. 
Employment land includes any land that
is immediately available for business use, which
means it is fully serviced and marketed, as
opposed to simply designated for
employment/industrial use in the Local
Development Plan. The land is therefore
immediately available for business expansion or
relocation purposes.
65.7% 
Year:
2017/18
This measure will be used for benchmarking purposes only and
therefore no targets have been set. 
2020/21 - Latest published data shows that 71.3% of North
Lanarkshire’s employment land was ‘immediately available’.
This is significantly higher than the Scottish average of 39.2%.
Commercial planning
applications -
average time
(weeks)
to process business
and industry
planning applications
Planning applications are important in terms of
the future development and use of land across
our towns and communities. 
An efficient and well-functioning planning
service plays an important role in facilitating
sustainable economic growth and delivering
high quality development in the right places. 
This indicator shows how long the council takes
to deliver commercial planning application
decisions 
(i.e., for a business and industry).
6.9 weeks 
Year:
2017/18
This measure will be used for benchmarking purposes only and
therefore no targets have been set. 
2020/21 – North Lanarkshire 13.5 weeks, compared to a
Scottish average of 11.1 weeks
Page 41 of 181

Page 42

Key Performance
Indicator
What does this tell us? Baseline Short term 
(By 31 March 2022)
Medium
term - 
ERDP Review
(By 31 March
2023)
Long term
(By 31 March
2035)
Target Actual Target Target
Percentage of
premises able to
access Superfast
Broadband
Digital infrastructure is one of the key gateways
to achieving inclusive growth and prosperity. By
improving our digital infrastructure, we will
connect North Lanarkshire to markets and
opportunities. 
NLC has a role alongside telecoms
companies in facilitating and enabling the
development of effective digital infrastructure. 
The required digital infrastructure speed needed
to have superfast broadband is 30Mbit/s.
97.0% 
Year:
2017/18
This measure will be used for benchmarking purposes only. 
2020 – North Lanarkshire – 97.8% / Scotland 90.1%
Carbon Dioxide (CO2)
emissions per capita
(tonnes)
Sustainability is one of the key principles which
underpins the ERDP. 
These estimates can assist us in understanding
our environmental impact and can be used to
inform our actions against climate change and
towards North Lanarkshire’s target of achieving
net zero emissions by 2030.
7.5t per
capita 
Year: 2014
This measure will be used for benchmarking purposes only. 
2019 – North Lanarkshire 5.3 tCO2 / Scotland 5.7 tCO2 
Page 42 of 181

Page 43

ERDP Performance Framework: Level 3
Day to day operations
Priority 1: We will help deliver the homes North Lanarkshire needs to grow
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
This reflects the council’s commitment (through the Local Housing Strategy and Programme of Work P013 -
New Supply Programme) to promote a supply of good quality affordable housing across all tenures. 
This also supports the Strategic Housing Investment Plan (SHIP) which helps deliver Local Housing Strategy
priorities and maximise resources in the Affordable Housing Supply Programme. 
The target to deliver 5,000 new homes by 2035, includes over 500 homes to be acquired through the open
market purchase scheme (an extension of the empty homes purchase scheme). 
As a significant proportion of the council’s housing stock is within multi-storey blocks, the new supply
programme is an integral part of the Programme of Work P014 - Tower Strategy. 
The first phase of the re-provisioning programme will potentially see all the council’s tower blocks
demolished, together with a number of low-rise blocks of flats, over the next 20 to 25 years. 
1. Ensure a housing mix that supports
social inclusion and economic growth.   
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities.
Key Performance
Indicator
What does this tell
us?
Note: These figures are cumulative and not additional to each other Lead Team(s)
Baseline Short term
(By 31 March 2022)
Medium term –
ERDP Review 
(By 31 March
2023)
Long term
(By 31 March
2035)
Target Actual Target Target
Number of new
build council
house completions 
The number of
new build house
completions via
the council’s New
633 
Years: 
2010/11 –
2018/19
972 934 
Amber 
1,205 3,600 New Supply
Page 43 of 181

Page 44

Supply housing
programme
Number of Open
Market Purchase
Scheme
completions
The number of
homes brought
into Council
ownership,
including some
homes previously
sold under the
Right to Buy.
133 
Years: 
2010/11 –
2018/19
509 457 
Amber 
689 1,400 New Supply
Household
connectivity
capacity
The % of new build
housing (via the
New Supply
Programme) with
high quality digital
infrastructure
capacity. High
quality digital
infrastructure
refers to a
property being
fibre broadband or
5G enabled.
79% 
Years: 
2010/11 –
2018/19
86% 86% 
Green 
89% 96% New Supply 
Page 44 of 181

Page 45

Priority 2: We will reshape and repopulate our town centres
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
A key priority within the Programme of Work, P018.1 - Economic Regeneration Delivery Plan (ERDP), is the
regeneration of North Lanarkshire’s town centres and their redevelopment as modern, high-quality, mixed-
use spaces with a much stronger focus on residential provision. 
1. Ensure a housing mix that supports
social inclusion and economic growth.   
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities.  
Key Performance
Indicator
What does this tell
us?
Note: These figures are cumulative and not additional to each other Lead Team(s)
Baseline Short term
(By 31 March 2022)
Medium term –
ERDP Review 
(By 31 March
2023)
Long term 
(By 31 March
2035)
Target Actual Target Target
Investment made
in town centres
developments
The amount (£)
invested in North
Lanarkshire’s key
town centres to
enable sites to be
re-purposed or re-
developed. This
includes NLC
investment and
external funding
sources.
£26.0M 
Year 2010/11 –
2018/19 
£63.5M £66.0M 
Green
£86.5M £299.5M Growth /
New Supply
External funding
secured for town
centre
The amount (£) of
external funding
secured for town
£10.3M  £30.4M £30.5M 
Green
£39.9M £125.9M Growth /
New Supply
Page 45 of 181

Page 46

regeneration
projects (including
town centre active
travel projects)
centre
regeneration
projects (including
town centre active
travel projects) in
North
Lanarkshire’s key
town centres.
Year 2010/11 –
2018/19
Number of key
town centre
buildings and/or
sites re-purposed
or re-developed
The number of
existing buildings
or vacant sites
within North
Lanarkshire’s key
town centres,
which have been
re-purposed or
redeveloped.
34 
Year: 2010/11-
2018/19 
53  53 
Green 
57 92 Growth /
New Supply/
Number of new
affordable housing
developments
within town
centres (or edge of
town)
The number of
units either
converted to
residential or new
build house
completions via
the NL New Supply
Programme, NLC
Growth
Programme and
SHIP within North
Lanarkshire’s 8 key
town centres.
Edge of town is
defined as within a
10-minute walk, as
887 new
affordable town
centre homes
completed 
Years:
2010/11 –
2018/19 
1,402  1,372 
Amber 
1,492 2,526 New Supply/
Growth/ RSLs
Page 46 of 181

Page 47

per Sustrans 20-
minute
neighbourhood
definition. 
Priority 3: We will enable our people and businesses to thrive
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
Although North Lanarkshire has a significant amount of industrial land and premises, some are not suitable
for today’s needs. To enable our people and businesses to thrive we’ll invest in business and industrial space
and in marketing North Lanarkshire as the place to invest and work. 
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
3. Maximise the use of our marketable
land and assets through improved
development in business and industrial
infrastructure. 
16. Transform our natural environment to
support wellbeing and inward investment
and enhance it for current and future
generations.
Key Performance
Indicator
What does this
tell us?
Note: these figures are cumulative and not additional to each other Lead Team(s)
Baseline Short term
(By 31 March 2022)
Medium term –
ERDP Review 
(By 31 March
2023)
Long term
(By 31 March
2035)
Target Actual  Target Target
Investment made
towards the
The amount (£)
invested in
£0.524M  £1.3M  £1.334M  £5.1M  £13.3M  Fusion Assets
/ Growth/
Page 47 of 181

Page 48

development of
business and
industrial
infrastructure
business and
industry zoned
land or upgrades
to existing
business and
industrial
infrastructure
across North
Lanarkshire. This
includes NLC and
ALEO funding
only. 
Year: 2018/19    Green   NLP
External/private
sector/loan funding
secured for office
and industrial
development
The amount (£) of
external, private
or loan funding
secured for
investment in
office and
industrial
developments
across North
Lanarkshire.
£1.3M 
Year: 2018/19 
£6.8M  £6.924M 
Green
£17.6M  £39.7M  Fusion Assets
/ Growth
Ha of land
improved for
business and
industrial use
The amount (Ha)
of land
remediated or
improved for
business and
industry use
across North
Lanarkshire.
3.61 ha 
Year: 2018/19 
4.07 ha  4.07 ha 
Green
6.34 ha  11.73 ha  Fusion Assets
/ NLP/
Growth
Sq. ft of
commercial
The amount
(square footage)
of commercial
18,000 sq. ft 
Year: 2018/19 
69,000 sq. ft  69,910 sq. ft 
Green
117,410 sq. ft  459,410 sq. ft  Fusion Assets
/ NLP/
Growth 
Page 48 of 181

Page 49

workspace created
or refurbished
workspace
created or
refurbished as a
result of
investment by
NLC, Fusion Assets
or NLP across
North Lanarkshire.   
Priority 4: We will connect North Lanarkshire
Why is this set of indicators of interest? The Plan for North Lanarkshire ambition
statement alignment
The Programme of Work P021 - City Deal aims to increase Gross Value Added across the entire Glasgow
City Region by providing increased access to jobs through improved connectivity to centres of employment
and opening up development opportunity. 
We will connect North Lanarkshire to markets and opportunities by improving our strategic infrastructure.
2. Refocus our town centres and
communities to be multifunctional
connected places which maximise social,
economic, and environmental
opportunities. 
4. Market and promote North Lanarkshire
as the place to live, learn, work, invest, and
visit. 
5. Grow and improve the sustainability and
diversity of North Lanarkshire’s economy 
16. Transform our natural environment to
support wellbeing and inward investment
and enhance it for current and future
generations.
Key Performance
Indicator
What does this tell
us?
Baseline  Short term 
(By 31 March 2022)
Medium term –
ERDP Review 
Long term  Lead Team(s)
Page 49 of 181

Page 50

(By 31 March
2023)
(By 31 March
2035)
Target  Actual Target Target
Investment made
in key
infrastructure
projects (including
City Deal projects)
to date)
The amount (£)
invested in key
infrastructure
projects (including
investment made
in City Deal
projects to date).
This includes NLC
direct investment
and Glasgow City
Region City Deal
funding.
£6.8m 
Years: 
2015/16 –
2018/19
£20.7m 
Year 2019/20 =
£1.44m 
Year 2020/21 =
£2.96m 
Year 2021/22 =
£9.5m 
£20.7m 
Green 
£45.93m £238.5m City Deal
Number of key
infrastructure
contracts
completed
The number of key
Enterprise Projects
or City Deal
infrastructure
contracts
completed. 
A long-term
project can contain
multiple contracts.
3
Years: 
2015/16 –
2018/19
5 5 
Green 
8 21 City Deal
Km of active travel
routes enhanced
or created.
The amount (Km)
of active travel
routes which link
communities,
arterial routes and
transport hubs
with town centres
and key business
3km 
Year: 2018/19 
7.8 km  7.8km 
Green 
20km  300km  Roads /
City Deal /
Growth
Page 50 of 181

Page 51

locations in North
Lanarkshire. 
Page 51 of 181

Page 52

Page 52 of 181

Page 53

North Lanarkshire Council 
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref CGF/AC Date 29/08/22 
Clyde Green Freeport Bid Update 
From  Pamela Humphries, Head of Planning and Regeneration  
E-mail conrya@northlan.gov.uk Telephone
Allan Conry, Enterprise
Development Manager –
07583 058110 
Executive Summary 
This report provides an update on a bid submission by Glasgow City Region (GCR)
member authorities and private sector partners for green freeport status. This follows
approval from the Enterprise and Growth Committee on 26th August 2021 that North
Lanarkshire Council should participate in the preparation and submission of such a bid.   
A green freeport is defined as a large, zoned area within a defined boundary which includes
a rail, sea and/or airport. It is anticipated that green freeport operators and businesses in
the zone would benefit from a package of tax and customs incentives. It is also expected
that they would adopt Fair Work First criteria, ensuring that employees are paid fairly, and
be fully committed to achieving net zero emissions. There will be two green freeport bids
selected in Scotland through a competitive bidding process. 
Officers from North Lanarkshire Council have worked with Glasgow City Region partner
authorities, along with representatives from private sector businesses associated with
some of the principal infrastructure facilities to form a green freeport bid in the GCR under
the brand Clyde Green Freeport (CGF). 
Clyde Green Freeport is a tri-modal bid covering air, sea and rail that will double capacity
to take products from across Scotland to the rest of the UK, Europe and beyond. Central
to the bid is a decarbonisation plan which would accelerate the Scottish and UK
Government’s net zero ambitions. Specifically, Clyde Green Freeport seeks to: 
• Create up to 30,000 new jobs (45,000 including construction jobs).
• Attract £2.5 billion of capital investment.
• Transform 600 hectares of vacant, derelict, and underdeveloped land.
• Generate £18 billion uplift in GVA to 2034; and
• Deliver an extensive decarbonisation plan to be net zero by 2040. 
AGENDA ITEM 4
Page 53 of 181

Page 54

1. Background 
1.1 Based on the UK Government's Freeports Bidding Prospectus for England, a draft
Applicant Prospectus for Scotland was published which set out the key elements where
the Scottish Government adapted the Freeports model for England to fit with the
Scottish context, applying Scottish Government priorities to create a ‘green port’ model. 
1.2 The freeport concept has been in existence for some time around the world. There are
an estimated 3,000 such designations worldwide. They tend to be located primarily at
seaports and operate as secure custom zones where, although inside the country’s
border, are subject to bespoke custom and tax arrangements aimed at bringing benefits
to the competitiveness of the companies located there who import, manufacture,
process and export goods. 
1.3 Goods that move into and out of a country are normally subject to tariffs (duty) payable
to that country. Goods that arrive into designated freeports are normally exempt from
such tariffs. Although these locations often offer reductions in regulatory and
administration burdens for businesses, they are designed to incentivise private
investment in the locality and create jobs and other economic benefits for the adjacent
local economies. If the goods are then moved elsewhere in the UK, they would be
subject to the normal tariffs and therefore any such designation in Scotland needs to
be specifically defined. 
1.4 The UK Government consulted on the principle of establishing 10 new freeports across
the UK in February 2020. At launch the UK Government set out a desire to have at
least one freeport in Scotland. 
1.5 At the March 2021 UK Budget, the UK Government announced 8 locations for new
freeports in England. The designation of such zones is a devolved matter. The English
locations selected from a total of 18 bids were: 
• East Midlands Airport 
• Felixstowe and Harwich 
• Humber region 
• Liverpool City Region 
• Plymouth 
• Solent 
• Thames 
• Teesside 
Recommendations 
It is recommended that the Committee consider the contents of this report and the
submission of the Clyde Green Freeport bid. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Page 54 of 181

Page 55

1.6  The publication of the Scottish prospectus was delayed due to the Scottish elections in
May 2021, as well as awaiting sign-off on elements from the UK Government. The final
prospectus was published on 25th March 2022 and confirmed 2 Green Freeports would
be awarded in Scotland following a competitive bidding process. 
2. Report 
2.1 Following approval from North Lanarkshire Council’s Enterprise and Growth Committee
on 26th August 2021, and following the publication of the Prospectus by the UK and
Scottish Governments in March, officers from the Glasgow City Region (GCR) and key
private sector partners at Glasgow Airport, Clydeport and Mossend International
Railfreight Park worked together, with the support of Mott McDonald consultants, to
prepare a Green Freeport bid. 
2.2  The prospectus for bidders who wish to establish a Green Freeport in Scotland was
published in partnership by the Scottish and UK Governments on the 25th March 2022.
The co-designed Green Freeport model seeks to deliver on 4 main objectives, all of
which need to be met by applicants:
• Promote regeneration and high-quality job creation – the lead policy objective
• Promote decarbonisation and a just transition to a net zero economy
• Establish hubs for global trade and investment
• Foster an innovative environment 
2.3 In addition to the 4 main objectives, a key focus of the Green Freeport model is to
stimulate a (net) growth in the number of jobs in the designated area. The Clyde Green
Freeport proposal is seeking to create of up to 30,000 new jobs (plus 15,000
construction jobs) within GCR.
2.4 Bidders were also required to offer a clear sectoral focus to their offer and build on
existing industrial clusters and to submit a clear and ambitious plan for decarbonisation
alongside distinct evidence that the plans will result in additional investment and
increased trade from existing companies or new ones moving into the area. 
2.5 As outlined in the prospectus, bidders were required to include at least one customs
site within their proposals and up to three tax sites. It should be noted that any financial
incentives for the tax sites will only apply to new development and/or investment i.e.,
for sites that are currently undeveloped or where a building is refurbished or
redeveloped as part of the plans. They do not apply to existing business properties that
will remain unchanged.   
2.6 Should green freeport status be achieved then a range of potential financial incentives
can be made available to the designated tax sites, subject to agreement of details with
HMRC, including: 
• Relief from Land and Building Transaction Tax for 5 years for qualifying
investments; 
• Enhanced Structures and Buildings Allowance (SBA); 
• Enhanced Capital Allowances (ECA): for companies investing in qualifying new
plant and machinery assets;
• Employer National Insurance Contributions (NICS) relief for certain employees
working in the tax site up to a maximum level of income; and
• Non-Domestic Rates Relief of up to 100% relief (for 5 years) on certain
properties and property improvements within designated tax sites. 
Page 55 of 181

Page 56

2.7 The specifics of any tax relief would be at the discretion of HMRC, and the individual
companies concerned who apply for such benefits. There is also an intention to allow
local authorities in which the tax sites are located to retain the business rates growth
because of the new investment achieved (above an agreed baseline). This would
enable local authorities and their partners to use such funds to invest in regeneration
and infrastructure that will support further growth in the area or off-set any borrowing
costs (where relevant) or to off-set any effect of displacement of local economic
activity from disadvantaged areas. 
2.8 Any designated customs site within a green freeport designation would be able to
apply to have import duties on supplies suspended and elect to pay such duties on
either imported goods or finished products (after being processed in the site). Any
such arrangement would be subject to strict criteria applied by HMRC and be subject
to having an authorised operator in place before such a designation applies. 
2.9 The prospectus also indicated that up to £25m will be made available in funding to
each successful green freeport designation. This funding comes with a requirement
to be matched locally by private investment, local authority borrowing or other
finance. Any such decisions on how to spend or match fund this seed funding would
be subject to further Committee reports should the bid be successful.
2.10 Specific to North Lanarkshire, Mossend was included as a key site within the Clyde
Green Freeport bid as it is home to a major rail freight hub and rail terminal. Appendix
1 outlines the proposed North Lanarkshire tax and customs sites within the Clyde
Green Freeport bid that would see regeneration of 283 hectares of land through £17
million of investment, unlocked by tax benefits and, in the longer term, £300 million
to develop the site and create the infrastructure needed. A new £44 million high
capacity, decarbonised rail interchange would be developed with eight 775m rail
sidings served by two electric gantry cranes, electric rail shunters, cross docking
facilities and associated road and rail access infrastructure. In addition, there will be
a net zero freight park consisting of 2.1 million square feet of manufacturing and
logistics buildings and associated facilities. This would meet the increasing demand
for exports for all of Scotland and support modal shift from road to rail, saving
225,000 tonnes of carbon annually. It would also create an opportunity for a
manufacturing heavy vehicles hub, leading to £120 million of investment and over
500 jobs, as well as for the manufacturing, maintenance and operation of new
innovative freight wagons, with an estimated £55 million of investment. 
2.11 The formal bid was submitted on 20 June to the Scottish and UK governments by a
partnership of Glasgow Airport, Peel Ports’ Clydeport, Mossend International
Railfreight Park in North Lanarkshire and Glasgow City Region councils, including
North Lanarkshire Council. The bid has already attracted support from many key
businesses and organisations based or operating within Glasgow City Region
including Caterpillar, Malcolm Group, SP Energy Networks, the Universities of
Glasgow and Strathclyde, Morrison Construction and Loganair. 
2.12  The Green Freeport Prospectus states that two winning bids will be announced in
Summer 2022 and will then be invited to develop a more detailed business case.  In
total, there have been five bids submitted across Scotland. 
2.13 In relation to ongoing governance, should the bid be successful a formal governance
body will be put in place. The arrangements for this are still to be determined but it is
anticipated this would include representatives from the three ports and corresponding
local authority representation. 
Page 56 of 181

Page 57

3. Measures of success 
3.1  Should bid be successful, the key measures of success across GCR will be: 
• The creation of up to 30,000 new jobs (45,000 including construction jobs).
• The attraction of £2.5 billion of capital investment.
• The transformation of c.600 hectares of vacant, derelict, and underdeveloped land.
• The generation of £18 billion uplift in GVA to 2034; and
• The delivery of an extensive decarbonisation plan to be net zero by 2040.   
4. Supporting documentation 
4.1 Appendix 1 outlines the proposed customs and tax sites within North Lanarkshire. 
4.2 A website for the bid has been created and can be viewed at: 
www.ClydeGreenFreeport.co.uk 
Pamela Humphries
Head of Planning and Regeneration 
Page 57 of 181

Page 58

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☒
If Yes, please provide a brief summary of the impact? 
• An Equalities Impact Assessment and Fairer Scotland Duty screening has been
completed by the partners as part of the bidding process in-line with legislation
and included in the Clyde Green Freeport bid. 
• Fair work practices are mandatory to all operator and businesses based within
the designated Green Freeport tax and customs zones. In addition, bidders were
required to propose additional innovative measures they would introduce to
support the Scottish Government's Fair Work priorities. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
There are no financial implications arising from the bidding process at this time other
than officer time. 
If the bid is successful and how any subsequent business case for the Green
Freeport is then developed, any financial implications arising, or decisions on future
investment decisions within North Lanarkshire, will be subject to separate Committee
reports at the appropriate time. 
The bid included match funding of £2.1m from the council’s City Deal Programme for
the contribution towards the Orchard farm roundabout which will enable access to
the business and industrial sites. 
The potential financial benefits to the council include the ability to bid for up to £25m
of seed funding which is available to each successful green/freeport area. This
funding comes with a requirement to be matched locally by private investment,
local authority borrowing or other finance. Any such decisions on how to spend or
match fund this seed funding would be subject to further Committee reports
should the bid be successful. 
There is also an intention to allow local authorities in which the tax sites are located
to retain the business rates growth because of the new investment achieved (above
an agreed baseline). This would allow local authorities and their partners to use such
funds to invest in regeneration and infrastructure that will support further growth in
the area or off-set any borrowing costs (where relevant) or to off-set any effect of
displacement of local economic activity from disadvantaged areas. 
Page 58 of 181

Page 59

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
Any legislative impact would relate to the legal status of any Green Freeport area in
North Lanarkshire, should the bid be successful. 
The future Governance arrangements, and the council’s role therein, would be
carefully considered as part of any future Business case development 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
Page 59 of 181

Page 60

There would be no anticipated negative environmental impacts of a Green Freeport
given the key objective is that the sites would contribute to be operationally net zero.
Furthermore, it is anticipated that the proposed modal shift from road to rail will
have significant positive environmental impacts including the saving of 225,000
tonnes of carbon annually. 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
A joint communications strategy has been put in place between GCR, the 3 councils
and the 3 private sector partners. This has been promoting the positive impacts of
the bid including the benefits to North Lanarkshire. A dedicated website: Clyde Green
Freeport | Scotland's Global Freight Gateway and supporting social media channels
(Facebook, Twitter, Instagram and LinkedIn) have been put in place alongside a
YouTube promotional video.   
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
There are no significant risk implications arising from this report. Should the Clyde
Green Freeport bid be successful a full risk impact analysis would be undertaken. 
Page 60 of 181

Page 61

Page 61 of 181

Page 62

Page 62 of 181

Page 63

North Lanarkshire Council
Report
Enterprise, Growth & Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref:  GF/CW Date 29/08/22 
Business Grants - Business Recovery and Growth Fund 
From  Pamela Humphries, Head of Planning and Regeneration  
E-mail weiry@northlan.gov.uk Telephone
Yvonne Weir
Enterprise Manager
07508 001238 
Executive Summary
Following committee approval in August 2020, the council has progressed delivery of two
in-house business grant schemes, namely the Back to Business Fund (BBF) and the
Business Recovery and Growth Fund (BRGF). 
The purpose of this report is to seek committee approval to increase the maximum grant
available to applicant businesses under the BRGF scheme from £20,000 to £50,000 per
business over a 24-month rolling period. Raising the maximum grant threshold will give the
council the flexibility to assist larger growth investments and projects of scale, resulting in
increased impacts and outcomes from the business projects supported by the funding. 
Recommendations
It is recommended that the Committee: 
1) Approve the proposed change to the North Lanarkshire Council Business Recovery
and Growth Fund, specifically to increase the maximum cumulative grant that can
be awarded to an individual business from £20,000 to £50,000 over a 24-month
rolling period.
2) Approve an increase in the number of capital expenditure, infrastructure
improvement and combined capital expenditure/infrastructure grants to a maximum
of 2 grants per business subject to the £50,000 maximum cumulative grant award
per business over a 24-month rolling period. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
AGENDA ITEM 5
Page 63 of 181

Page 64

1. Background 
1.1 Whilst the wide range of Covid-related business funds delivered by both the council
and other external parties on behalf of the Scottish Government focussed on supporting
cash flow, fixed costs and loss of income, the council put in place a Back to Business
Fund and a Business Recovery and Growth Fund to support businesses requiring
financial assistance to adapt and grow in order to realise their growth ambitions aligned
to the council’s Economic Regeneration Delivery Plan and Economic Recovery Plan.
These funds have a budget of approximately £1.7m, excluding ERDF funding. 
1.2 The funds are competitive and discretionary seeking to support as many businesses
as possible. The funds seek to support local businesses to recover and grow following
the impact of Covid-19. More recently, businesses have faced increased challenges
arising from pressures on supply chains and rising input costs, leading to higher
operating costs. By providing project-specific funding, the BRGF scheme offers
businesses assistance to take forward growth projects despite the increasing financial
pressures arising from global economic conditions. 
1.3 Specifically, the council’s Business Recovery and Growth Grant Fund currently
provides grants of up to £20,000, targeted at existing Small and Medium sized
Enterprises (SMEs) to support their strategic, longer-term sustainability and growth.
This grant funds specific activities to help businesses adapt and grow following the
impacts of Covid on their operations through Capital Expenditure, Infrastructure
Improvements, Training Support, Consultancy Support and Exhibition Support. In
contrast to the Covid grants previously administered by the council, the BRGF grant
scheme is geared towards supporting specific growth projects and cannot provide
funding towards day-to-day working capital requirements. 
1.4 The maximum grants currently available via the BRGF scheme are outlined below.
BRGF grants can only contribute up to 50% towards eligible project costs (excluding
VAT), and so a financial commitment from the applicant business is required in the form
of match funding (minimum 50%): 
Project Type Maximum grant
Capital Expenditure £20,000
Infrastructure Improvement  £20,000
Combined Capital Expenditure and Infrastructure £20,000
Consultancy Support £5,000
Exhibition Support £4,000
Training Support £4,000 
Furthermore, applicant businesses can only apply for and receive one BRGF grant per
category within a rolling 24-month period, and the maximum cumulative BRGF grant
awarded to any business within a 24-month period is limited to £20,000 at present. 
2. Report 
2.1 The financial support available from the Council continues to be a valuable mechanism
to help businesses adapt, grow, and recover from the impacts of the Covid-19
pandemic, and also helps them take advantage of new business opportunities at a time
when increasing economic pressures are creating financial barriers to growth.
However, despite these challenges, growth opportunities also exist in various industry
sectors within North Lanarkshire and many businesses are now undertaking expansion
projects. 
Page 64 of 181

Page 65

2.2 The increasing scale of investment proposals coming forward to the council from local
businesses has resulted in a recommendation that there should be an increase in the
maximum grant to £50,000 in order to help these larger projects take place sooner, on
a larger scale, or to achieve enhanced outcomes. The council has received specific
enquiries from a number of applicants concerning any flexibility to apply for grant in
excess of the current £20,000 maximum. Typically, such examples relate to conversion
or fit-out of commercial premises (for example when a business is re-locating to
accommodate growth), or to investment in advanced industrial plant and machinery
required to enable expansion into new markets or improved productivity. Debt finance
via Business Loans Scotland can be an alternative source of funding for some of these
projects, and where appropriate the council will signpost companies to BLS, however
in terms of grant funding there are very few other options available to local SMEs apart
from the council’s business grant schemes. 
2.3 The requested increase to the maximum grant value would only apply to Capital
Expenditure and Infrastructure Improvement project proposals received from
businesses, as such investments tend to be of a scale which generates the greatest
economic benefit in terms of job creation, turnover growth and local economic impact.
Raising the maximum grant threshold will give the council the flexibility to assist larger
growth investments and projects of scale, resulting in increased impacts and outcomes
and potentially an increased return on the council’s investment. It is recommended that
the current grant thresholds for Consultancy Support, Exhibition Support and Training
Support remain unchanged as outlined in Section 1.4 above. 
2.4 The demand for BRGF grants to date provides some context of the business growth
and innovation that is taking place despite prevailing economic conditions. Since
autumn 2021, the BRGF scheme has approved 58 grant applications from 45
businesses, totalling £629,171.61 in grant funding. A further 12 applications from 8
businesses are pending assessment or currently awaiting supporting information,
equivalent to an additional £169,144.96 in potential grant awards. Supported projects
encompass a wide range of major investments, but frequently feature large-scale
conversion and improvement of premises or the purchase of expensive items of
equipment and machinery to facilitate business growth (as referenced above). 
2.5 The impact in terms of job creation and turnover increase within the businesses
receiving support is significant and these projections are recorded when a grant
application is received and then actuals are requested from the business once the
project is completed (within 12 months of the grant award date). The projections at
application stage for the approved and pending applications are:
• 61 jobs created immediately
• 210.5 jobs created after 12 months
• 460 jobs safeguarded immediately
• 499 jobs safeguarded after 12 months
• £11,364,999.50 increase in turnover 
2.6 The additional funding required to extend the maximum grant amounts will be funded
through the Local Authority COVID Economic Recovery (LACER) funding received by
the council from the Scottish Government to support local economic recovery and
through the drawdown of funding from the European Regional Development Fund.
2.7 It is proposed that the BRGF grant maxima for Capital Expenditure and Infrastructure
Improvement projects is amended as follows:- 
Page 65 of 181

Page 66

Type of grant PROPOSED
maximum number
of grants in a 24-
month period
PROPOSED 
maximum grant
award in a 24-
month period –
New Applicants
PROPOSED
maximum grant
award – Previous
Applicants (within
a  24 – month
period)
Capital Expenditure 2 applications  £50,000 
£50,000 minus 
previous BRGF
award
Infrastructure
Improvement  2 applications  £50,000 
£50,000 minus 
previous BRGF
award
Combined Capital
Expenditure and
Infrastructure 
2 applications £50,000  £50,000 minus 
previous BRGF
award
Consultancy Support 1 application £5,000 £5,000
Exhibition Support 1 application £4,000  £4,000
Training Support 1 application £4,000  £4,000 
2.8 In addition to the above limits per category of grant, the maximum cumulative BRGF
grant awarded to any business within a 24-month rolling period will be capped at
£50,000. This includes all capital expenditure, infrastructure, consultancy support,
exhibition support and training support funding for which the applicant may apply.
Furthermore, the total amount of public sector funding support for the project in
question must not exceed 50% of total project costs (exclusive of VAT).
2.9 For applicants who previously applied for BRGF grant support since the launch of the
scheme in November 2021 (when the maximum grant was capped at £20,000) it is
proposed that businesses can now be considered for additional grant support (for new
projects) up to a maximum cumulative BRGF grant award of £50,000 within a 24-month
rolling period. 
3. Measures of success 
3.1  North Lanarkshire Council continues to play a leading role in supporting local SMEs
and aiding their growth and prosperity. The North Lanarkshire Business Recovery and
Growth Fund measures the number of jobs safeguarded, jobs created, number of
businesses supported and any growth in turnover as a result of the support provided.
4. Supporting documentation 
4.1 The existing Business Recovery and Growth Fund guidelines can be viewed at:
Business Recovery and Growth Fund | North Lanarkshire Council. 
Pamela Humphries
Head of Planning and Regeneration 
Page 66 of 181

Page 67

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The total budget for the programme is £1,314,283.60 which is subject to approval of
an additional £450,000 of ERDF funding. The North Lanarkshire Council additional
match funding required to extend the grant amounts will be funded through the Local
Authority COVID Economic Recovery (LACER) funding received by the council from
the Scottish Government to support local economic recovery and through the
European Regional Development Fund (ERDF). ERDF will be in place until June
2023. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☒ No ☐
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact Page 67 of 181

Page 68

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Changes to the grant scheme criteria will be published on the council’s website and
promoted on social media channels.
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
The key risks which are assessed and recorded in the Service Risk Register are as
follows:
- Fraud: The council has robust grant processes in place. Grants are paid
retrospectively following evidence of expenditure by the business.
- Eligibility of grants for the European Regional Development Fund: All grants
are checked for compliance prior to payment to ensure there is no risk of
non-compliance with funding rules and regulations. 
Page 68 of 181

Page 69

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref PH/DG Date 29/08/22 
External Funding update 
From  Pamela Humphries, Head of Planning and Regeneration 
E-mail GreerD@northlan.gov.uk Telephone
David Greer, Growth
Programme Manager
07583 059816 
Executive Summary
This report provides information on a range of external funding opportunities
which are available for physical regeneration activity. In addition, this report will
provide an update on the work which the council is currently undertaking to secure
this funding or deliver strategic programmes and projects to ensure full spend of
external funding secured. 
This includes updates on: 
 the UK Government’s Levelling Up Fund;
 the Scottish Government’s Place Based Investment
Programme (including the Regeneration Capital Grant Fund and
Town Centre Demonstrator);
 the Scottish Government’s Vacant and Derelict Land Fund and
Vacant and Derelict Land Investment Programme; and
 the Scottish Government’s Green Growth Accelerator. 
Recommendations
It is recommended that committee acknowledges: 
1) the update provided on both first and second round Levelling Up Fund applications 
2) the funding allocation made through the Scottish Government’s Place Based
Investment Programme, the council’s plans for using its allocation and current
work aimed at securing additional funds from the Programme 
3) the successful bids for the 2022-23 Regeneration Capital Grant Fund and Vacant
and Derelict Land Investment Programme 
4) the bids submitted for 2023-24 Regeneration Capital Grant Fund and Vacant and
Derelict Land Investment Programme 
5) the update provided on the Council’s 2022-23 ‘Local Delivery Plan’ for the Vacant
and Derelict Land Fund
AGENDA ITEM 6
Page 69 of 181

Page 70

1. Background 
Levelling Up Fund 
1.1 The UK Levelling Up Fund (LUF) will provide £4.8bn worth of capital investment across
the UK by 2025-26. Funding is expected to be made available across three rounds, the
first of which took place during 2021-22. Local authorities are eligible to make a bid for
each UK Parliament constituency in their areas, plus an additional bid for a transport
infrastructure project. 
1.2 The LUF supports town centre and other physical regeneration, culture and transport
projects. Local authorities can bid for up to £20m in LUF support for each project, with
the exception of large transport projects (up to £50m). The LUF will also provide more
than £20m in funding for up to two large cultural projects. 
1.3 The second round of the LUF, for 2022-23, closed for bids on 2 August 2022. UK
Government has committed to spending 9% of all monies allocated from this round to
projects in Scotland. 
Placed Based Investment Programme 
1.4 The Scottish Government has established a Place Based Investment Programme
(PBIP), linking and aligning place-based funding initiatives. The PBIP will provide £325m
in funding for place-based regeneration projects over the lifetime of the current Scottish
Parliament. 
1.5 The main objectives of the PBIP are: 
 to link and align place based initiatives and establish a coherent local framework
to implement the Place Principle;
 to support place policy ambitions such as town centre revitalisation, community
led regeneration, 20 minute neighbourhoods and Community Wealth Building;
 to ensure that all place based investments are shaped by the needs and
aspirations of local communities; and
 to accelerate ambitions for net zero, wellbeing and inclusive economic
development, addressing inequality and disadvantage and community
involvement and ownership 
1.6 £140M of this funding will be allocated directly to local authorities, which will be 
provided with annual allocations for spend in each of the five financial years from 
April 2021. 
6) the development of a full business case which aims to secure Green Growth
Accelerator support to deliver the low-carbon redevelopment of Strathclyde
Country Park.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Page 70 of 181

Page 71

1.7 The PBIP also now incorporates the Scottish Government’s Regeneration Capital
Grant Fund, committing up to £25M a year over each of the next 5 years, and other
discrete funding schemes, including the £8m Town Centre Demonstrator fund which
will support a small number of town centre regeneration projects. 
1.8 RCGF provides capital grant funding for physical regeneration projects and is open to
Scotland’s 32 local authorities and special purpose vehicles (SPVs) established by
local authorities for the purpose of urban regeneration activity. Local authorities and
SPVs can apply on behalf of ALEOs and other partners, including community groups,
and will act as a conduit for grant funding. 
1.9 The PBIP also includes a new £8m national Town Centre Demonstrator fund which
was launched earlier in 2022 to support innovative projects which can provide lessons
for similar towns across Scotland.  This fund is being run as a closed competition, with
only invited local authorities allowed to submit bids which will be considered by a
Scottish Government panel. 
Vacant and Derelict Land Fund and Vacant and Derelict Land Investment   
Programme 
1.10 The Vacant & Derelict Land Fund (VDLF) is a ring-fenced capital grant allocation which
provides financial support from the Scottish Government to assist with the regeneration
of registered vacant and derelict land sites across selected local authority areas. The
Scottish Government has committed to maintaining the VDLF for 2022-23 but there is
no guarantee of funding for those authorities (including the council) in subsequent
years. 
1.11 Funding provided through the VDLF programme is subject to the submission (and
approval by the Scottish Government) of an annual Local Delivery Plan which sets out
local authority investment proposals to meet the objectives of the VDLF programme.
These objectives are to: 
 tackle long term vacant and derelict land (and in particular sites which have
been registered as vacant or derelict for at least 15 years);
 stimulate economic growth and job creation;
 develop a diverse sustainable environment with a focus on temporary
and permanent greening; and
 support communities to flourish and tackle inequalities. 
1.12 There is a range of activity which this fund cannot support including major infrastructure
works, flood mitigation, retail and housing projects. 
1.13 Whilst organisations other than local authorities and SPVs cannot apply directly to this
fund, the council can apply on behalf of ALEOs and other partners and act as a conduit
for this grant funding. 
1.14 In addition to the existing VDLF programme, the Scottish Government launched their
Vacant and Derelict Land Investment Programme (VDLIP) in early 2021, providing £50M
over the five years between 2021 and 2026 to support placed based approaches for
tackling persistent vacant and derelict land and delivering regeneration and sustainable
growth as part of the green recovery.
Page 71 of 181

Page 72

Green Growth Accelerator
1.15 The Green Growth Accelerator (GCA) aims to unlock £200 million of additional
investment in infrastructure projects to support Scotland’s transition to an inclusive net-
zero emissions economy. 
1.16 The GGA is a financial tool where successful applicants invest initial capital in ‘green
infrastructure’ with this investment repaid across future years based upon their success
in meeting targets for carbon reduction and related measures. The successful applicant
has discretion over how it funds the initial infrastructure investment, for example through
capital grant, borrowing or receipts and flexibility over timescales for repayment. 
1.17 The GGA was announced in the 2020-21 Budget and a call for ‘Pathfinder Projects’
launched in June 2021. The Scottish Government committed to provide successful
pathfinder authorities with initial revenue funding to help develop business cases for
submission for full funding awards during 2022-23. Where projects are approved, local
authorities are eligible for revenue payments which meet up to £10m of initial capital
investment (including any borrowing costs), subject to achieving agreed outcomes. 
2. Report 
Levelling Up Fund 
2.1 The first round of the LUF was launched in March 2021, for bid submissions by June
of the same year. Due to the restricted timescales and resources available to develop
bids, the council took forward only one bid to this round, for enabling works to kick-start
the reshaping and renewal of Cumbernauld Town Centre in line with the recently
approved Cumbernauld Town Centre Vision. This bid was unsuccessful however UK
Government officials provided positive feedback to officers and encouraged the bid to
be revised and resubmitted in future rounds. 
2.2 The second round of LUF was launched in April 2022. As agreed at previous Enterprise
and Growth committees in November 2021 and February 2022 the following bids have
been developed and submitted by the revised deadline of 2 August 2022 for each of
the four Westminster constituencies: 
 Airdrie and Shotts: delivering town centre living by repurposing prominent
vacant or derelict buildings and sites for mid-market rent homes in Airdrie.
 Coatbridge, Chryston and Bellshill: the redevelopment of Summerlee
Museum of Scottish Industrial Life, which will be transformed into a world-
class visitor destination and outstanding community asset.
 Cumbernauld, Kilsyth and Kirkintilloch East: enabling acquisition and
demolition works to support the later development of a new Town Hub and
reshaped, repopulated Cumbernauld town centre.
 Motherwell and Wishaw: enabling groundworks to support the development
of new community facilities and affordable homes for Ravenscraig. 
2.3 These bids were subject to engagement with local members, MPs and MSPs.  The
outcome of the bids is expected in the Autumn. 
Page 72 of 181

Page 73

Place Based Investment Programme
2.4 The council was allocated £2.436m for spend from the PBIP in 2022-23.  Details of the
projects to be funded which meet the PBIP criteria, including the requirement for
funding to be spent or legally committed by 31 March 2023, and which align to the
priorities set out in the Economic Regeneration Delivery Plan (ERDP) are outlined in
Appendix 1.   
2.5 The Regeneration Capital Grant Fund (RCGF) now also forms a separate part of the
Scottish Government’s PBIP. 
2.6 The council succeeded with bids to earlier rounds of RCGF, including funding in 2021-
22 for projects in Motherwell (Reeltime Community Music Facility) and Shotts
(Springhill Community Hub). 
2.7 The council was successful for its bid for £1.8m in RCGF funding during 2022-23 to
support the low-carbon redevelopment of Braidhurst Industrial Estate. 
2.8 The current round of RCGF sought initial ‘stage 1’ bids by 17 June 2022.  Following a
‘call for bids’ advertised to community organisations and within the council, five bids
were submitted for projects: 
 ‘Active travel connections’, providing the ‘missing links’ in the active travel
network to connect Bellshill, Motherwell and Wishaw.
 A new ‘community memory store’ for collections and social history at
Summerlee Museum of Scottish Industrial Life.
 Development of a new health and wellbeing hub by Motherwell FC
Community Trus.t
 Redeveloping a former NHS clinic to create a community hub in Croy
 Supporting the low-carbon redevelopment of Strathclyde Country Park (see
Green Growth Accelerator for further information) 
2.9 Decisions on these bids are expected in August 2022, with those succeeding at stage
1 invited to make stage 2 (award stage) bids in October, with funding decisions
expected in December. 
2.10 The council was invited to apply for Town Centre Demonstrator (TCD) funding and,
after initial discussion with Scottish Futures Trust (which manages the competition on
the Scottish Government’s behalf) on the types of projects which may be suitable for
the TCD and its timescales for spend, the council submitted initial proposals for projects
in both Airdrie and Motherwell. Following feedback, a full application for funding has
been submitted for Airdrie, which aims to establish a land assembly and reuse fund
which will enable both site acquisition and follow-on development in the town centre to
support delivery of the town vision and help increase residential provision in the town
centre.  A decision on this proposal is expected in the autumn. 
Vacant and Derelict Land Fund and Vacant and Derelict Land Investment Programme
2.11 The Scottish Government allocated £1.938m from the Vacant and Derelict Land Fund
(VDLF) to North Lanarkshire Council, subject to the submission and approval of a
2022/23 VDLF Local Delivery Plan (LDP).  The proposed projects to be delivered from
the 2022/23 VDLF were approved at Enterprise & Growth Committee in February 2022. 
Page 73 of 181

Page 74

2.12 This LDP was approved by the Scottish Government in July and the projects which will
be delivered through the council’s VDLF Programme are: 
 Ravenscraig Plot 1: £1.3m in enabling earthworks, including drainage, to
allow for later access roads, services and utilities to be brought in to provide
a development ready site. This project is expected to lever in £9m in private
investment for 65,000 square feet of industrial development which will
create 128 permanent new jobs.
 Ravenscraig Plot 1 Microgeneration feasibility study: £38,000 to review
options for follow-on industrial development to meet the council’s
aspirations for a Net Zero North Lanarkshire.
 Gartcosh Business Interchange Phases 3 and 4: £600,000 for enabling and
remediation works to allow for follow-on development, building on the
success of Phases 1 and 2. 
2.13 In addition to VDLF, the council also made two Stage 1 applications to the second round
of the Vacant and Derelict Land Investment Programme (VDLIP) for projects in 2022-
23. A bid for £230,911 to deliver ‘Glenmanor Greenspace’, a community greening
project in Moodiesburn, was successful while an application for the second phase of
the Ravenscraig Active Travel Link (RATL), connecting Craigneuk with New College
Lanarkshire, was unsuccessful but has been held in reserve should any other funded
projects not proceed. 
2.14 The council has submitted stage 1 bids for phase two of the RATL and for a separate
project which will deliver enabling groundworks to support the development of 21 new
affordable housing on a long-term vacant and derelict site at Caledonian Road in
Wishaw. Outcomes of these stage 1 bids is expected in August, with those bids
succeeding at stage 1 invited to make stage 2 (award stage) bids in October, with
funding decisions expected in December. 
2.15 The council will continue to engage with local communities to develop projects that can
be submitted to future rounds of both RCGF and VDLIP in 2023 and subsequent years. 
Green Growth Accelerator (GGA) 
2.16 The council’s bid proposal for GGA support for the low-carbon redevelopment of
Strathclyde Park was selected as one of five GGA Pathfinder projects in September
2021. NLC was awarded £120,000 in funding to help develop a business case for full
support of up to £10m in funding to support capital investment. 
2.17 Consultants were appointed to carry out extensive surveys and provide costed design
proposals based around three key elements: 
 The net zero redevelopment of the Park’s Watersports Centre and
Bothwellhaugh Cottage, ‘retrofitting’ the existing buildings and installing
solar photovoltaic array to meet energy demand
 The installation of a water source heat pump in Strathclyde Loch to meet
the Park’s heat demand
 The installation of new renewable-fuelled EV charging points and street
lighting. 
Page 74 of 181

Page 75

2.18 These proposals were received in early July and formed the basis of the council’s
business case for GGA funding, which was submitted to the Scottish Government for
consideration at the end of that month. A decision on funding the project is expected
later in the year and officers have been preparing additional bids for support to meet
any prospective funding gaps (see RCGF above). 
3. Measures of success 
3.1 The primary measure of success arising from the work and updates outlined in this
report would be to: 
 maximise the funding drawdown from the external funding opportunities
outlined in this report; and
 ensure that the funding drawdown from these sources is used to best enable
the council to achieve its wider goals for community and environmental
regeneration and inclusive economic growth.     
4. Supporting documentation 
Appendix One: Place Based Investment Programme List 2022/23 
Pamela Humphries
Head of Planning and Regeneration 
Page 75 of 181

Page 76

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The funding programmes outlined in this report are very much focused on promoting
inclusive growth and a fairer Scotland and will do so by: 
 delivering physical regeneration projects that will improve the local
environment and tackle problems which continue to constrain community
regeneration;
 creating infrastructure that will help improve health and well-being and
provide North Lanarkshire’s most disadvantaged communities with new
leisure, learning and economic opportunity; and
 ensuring that our place based investments are shaped by the needs and
aspirations of all of our local communities. 
Consideration will also be given to equalities issues as part of the bids and projects
developed in response to the identified funding opportunities whilst the council will
also work closely with ALEOs, partners and third-party organisations involved in the
delivery of these to ensure that equality considerations remain core throughout. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Scottish Government external funding programmes such as PBIP, VDLF, RCGF and
VDLIP can provide up to a 100% project funding and as such do not require match
funding. However, challenge fund bids to programmes such as RCGF and VDLIP are
more likely to be successful where match is provided to overall project costs. In
these cases, where such funding is invested in council owned assets, it is likely that
the Scottish Government would expect NLC to contribute funding to these (although
there is no set percentage). 
The UKLUF provides up to a maximum of £20M per project and 90% of total project
costs. As such, the development and delivery of these projects, unless already
included as part of the Capital Programme, could result in the need to reprioritise
budgets to ensure that the drawdown of this external funding can be maximised. 
It should also be noted that due to the complexity of bids and requirement for
detailed costs, there will be a requirement for feasibility, design and site investigation
works to support the UKLUF bids. However, the UK Government has provided a
‘one-off’ payment of £125,000 to manage Levelling Up projects and future bids to this
Page 76 of 181

Page 77

fund, which has been used to support bid development. 
The GGA Pathfinder also gives rise to potential financial impact particularly in
relation to how initial capital investment is met, how risk of ‘under repayment’ can be
minimised or negated and timescales for repayment. The council will continue to
work with the Scottish Government to minimise these risks, including through
agreeing realistic outcomes for which revenue payments are based on. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Page 77 of 181

Page 78

The implementation of the programmes supported through capital programmes such
as the VDLF, PBIP and the LUF provide significant opportunity for local environment
improvements to greenspace, town centres and community facilities. Moreover, the
proposals put forward as part of the GGA Pathfinder would bring forward significant
carbon savings and develop a demonstrator project to help support the council to
meet its future net zero carbon targets. 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The promotion of opportunities delivered through new funding programmes or
success in gaining external funding for projects will continue to be managed and co-
ordinated through Corporate Communications. 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
External funding programmes do bring a measure of risk to the council particularly in
relation to potential budget overspend for projects and/or the requirement to repay
funds due to failure to deliver projects properly (a risk which is increased where
delivery is through a third-party). 
To help reduce and mitigate risk, a full risk assessment is undertaken for all funding
programmes and/or externally funded projects as part of the council’s project
management process and where complex/high risk projects are being developed or
delivered, risk workshops will be set up to ensure all service and partner risks are
identified. 
Page 78 of 181

Page 79

Appendix 1: North Lanarkshire’s Place Based Investment Programme 2022/23 
THEME PROJECT DESCRIPTION TOTAL COST Match/ other
funding
Projected   
22/23 PBIP
Spend/
Commitment
Town Centre
Regeneration
Braidhurst
Industrial Estate
New / refurbished industrial units
and environmental improvements.
Contribution will focus on micro
generation
£5,000,000 tbc £4,500,000 £500,000 
Motherwell
Library
Immersive classroom/digital
learning & access to be
incorporated within Mother Library
- this builds upon recently
completed external works and
rewiring recently contracted
£414,778  £414,778 
Orrs, Airdrie Contribution for the commercial
units at the new development
£3,200,000 £3,040,000 £160,000 
Café Refresh,
Motherwell
Continuation of existing PBIP
supported project 
£75,000 £0 £64,000 
20 Minute
Neighbourhoods 
Active Travel Ph2,
Ravenscraig
Continuation of existing PBIP
supported project 
£1,100,000 £750,000 £350,000 
Active Travel
Hubs,
Motherwell
Continuation of existing PBIP
supported project
£144,000 £0 £115,000 
Motherwell
Station Active
Travel Links   
City Deal Project – application
being prepared and external match
funding being sought for creation
of active travel routes at
Motherwell Station.
£1,200,000 £700,000  £500,000
Placemaking/
Community
Wellbeing Glenmanor,
Moodiesburn
PBIP contribution to community
greenspace project being
supported by VDLIP 
£298,000  £238,000  £60,000 
Newmains 
Feasibility study and potential
acquisition of commercial property
in Newmains for future demolition
and conversion to community
garden. 
£150,000  £0  £150,000 
Cumbernauld
Community
Allotments
PBIP supported this project in
21/22. Due to an increase in
groundworks, additional funds
are required. 
£370,000  £350,000  £20,000
Other To Be Allocated Funding for projects under
development.
£0 £0 £102,222
Total   £10,277,000 £7,841,000 £2,436,000 
Page 79 of 181

Page 80

Page 80 of 181

Page 81

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  JO’N/PK Date 29/08/22 
Employability – EU Funds Update 
From  Janie O’Neill, Head of Education & Families (South)  
E-mail oneillja@northlan.gov.uk Telephone   07790 894444 
1. Background 
1.1 Driving up the employment rate in North Lanarkshire is a cornerstone of The Plan for
North Lanarkshire and ensuring employability support is available to all is recognised
as a major contributor to both local economic development and tackling poverty.  North
Lanarkshire Council delivers large scale employability programmes across all
Executive Summary 
This report seeks approval to negotiate an extension with the Scottish Government to the
Council’s EU funded programme from December 2022 to June 2023.  The report outlines
the role of the EU funded programme in supporting employability services in North
Lanarkshire and the steps involved in securing an extension.  It also provides an update
on the current labour market in North Lanarkshire and the new challenges created by the
impact of the pandemic in the last two years as well as demonstrating the strategic context
of the work of the employability team within some of The Plan for North Lanarkshire’s
Programmes of Work.  
Recommendations
It is recommended that Committee: 
(1) Acknowledge that the necessary steps are taken by Council officers to secure an
extension of the current EU funded employability programme from December
2022 until June 2023.
(2) Consider the information provided on the current labour market in North
Lanarkshire.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
AGENDA ITEM 7
Page 81 of 181

Page 82

communities, and these are targeted on supporting those unemployed and
underemployed residents who face additional barriers to entering the labour market. 
These programmes support a range of groups, and all have the aim of securing fair and
sustained work for residents.  Reducing poverty is central to each of these programmes
and, in line with The Plan for North Lanarkshire, including all residents in the economic
growth of our area is viewed as central to the work on employability. 
1.2 Over half of the Council’s employability support to residents is funded from its EU
funded programme through an agreement with the Scottish Government.  This funding
comes from the European Social Fund (ESF) and the current programme, known in
North Lanarkshire as ‘Prospects for You’, is funded until December 2022 with a focus
on engaging unemployed residents with at least two barriers to getting work.   As part
of the withdrawal agreement from the EU it was agreed that existing commitments to
EU funded projects could remain in place past the UK withdrawal date of 31 January
2020.   
1.3 In North Lanarkshire the programme is led and co-ordinated by the Council’s
employability team which also provides the key function of engaging employers onto
the programme.  Routes to Work Ltd are funded to provide specialised case worker
support to unemployed residents as well as support with accessing vocational training
and the short-term costs associated with moving from benefits to employment such as
childcare and travel.  They also provide in-work support for up to 6 months for those
participants that require it. The External Funding team within Enterprise and
Communities are also funded through ESF to provide a compliance and verification role
on the distribution of the funding.  The programme is co-funded by the Council and EU
with 46% of funding coming from the EU and has an annual cost of around £4.5 million
and funds the 82.44 fte staff delivering the programme as well as the other costs
associated with training for participants, wage subsidies to employers, childcare, and
vocational qualifications. 
1.4 In recent years employability support has also been significantly bolstered by increased
levels of funding from the Scottish Government through its No One Left Behind,
Parental Employment Support and Young Persons Guarantee funding and these have
been integrated and aligned with the existing EU programme to broaden its range and
deepen its penetration into under-represented groups in the labour market.   
2. Report 
2.1 The Scottish Government have indicated to North Lanarkshire Council that there is an
opportunity to extend the operational delivery of the EU funded employability
programme from December 2022 until June 2023.  The negotiation of the extension
would involve reprofiling the financial commitment and grant as well as the outcomes
from the programme.  Given the EU, via the Scottish Government, would continue to
fund 46% of activity this would provide continued large-scale activity for another six
months. 
2.2 In terms of the scale of activity that could be expected, in 2021/22 the programme
engaged with over 1,300 residents and supported 715 into employment and in 2022/23
is expected to engage with over 1,500 residents and support 869 into work with at least
70% sustaining employment for six months.  Alongside the additional jobs that could
be secured with an extension it also allows additional time for the transition to the next
phase of employability support to be developed. 
Page 82 of 181

Page 83

2.3 The UK Government’s replacement for EU funds is the Shared Prosperity Fund and
the overall strategy in terms of externally funded employability programmes is to
transition these as smoothly as possible in 2023/24; however, that is the year there is
most demand on that source of funding.  Therefore, maintaining the existing EU funding
for as long as possible will lessen the demand on that source.  The negotiation with the
Scottish Government would aim for a conclusion by 30 September 2022 and would
require consultation with finance colleagues as well as the ALEO, Routes to Work Ltd,
to develop the revised financial profile and outcomes. 
Current Labour Market and Strategic Context 
2.4 The impact of the pandemic on the national and local labour market has created new
challenges for employers and those out of work.  The North Lanarkshire claimant count,
which acts as a measure of unemployment, was 14,415 (6.6%) people in March 2021
compared with 8,225 (3.8%) in March 2020, a 75% increase on the pre-pandemic level.  
However, in May 2022 it has decreased to 8,050 (3.7%).  On the face of it this is good
news but behind the unemployment figures real challenges are apparent.   As 2021/22
progressed it became clear that a significant number of people, mainly older workers
and the majority women, had left the labour market either through early retirement,
health concerns or to take up caring responsibilities.  These factors, combined with the
rapid re-opening of the economy through 2021/22 led to staffing shortages across a
range of sectors with jobs available, especially at entry level, for those who were job
ready or even nearly job ready.  
2.5 The number reported as ‘long term sick’ in North Lanarkshire has increased from
14,900 in December 2019 to 29,400 in December 2021 and the number reported as
‘looking after family/home’ in the Council area increased from 8,500 to 13,000 in the
same period.  While unemployment is lower than pre-pandemic levels the number of
people in the workforce in North Lanarkshire has reduced from 174,000 (78.1%) in
December 2019 to 159,300 (71.1%) in December 2021. The other concerning national
trend is that despite falling unemployment, long-term unemployment remains above
pre-pandemic levels; with the long-term unemployed now accounting for 35% of all
those unemployed (compared with 28% two years ago). Short-term unemployment is
at its lowest ever level.  For those in work there are also concerns as pay growth
remains well below inflation in many of the sectors predominant in North Lanarkshire
with the rising cost of living affecting the financial benefits of employment and labour
shortages and rising costs and supply chain challenges affecting employers plans for
recruitment and business development.   So, despite a fall in unemployment in the area
there is higher worklessness, negative pay growth and continued labour shortages for
businesses and these factors will have a continued and sustained impact on the
demand for Council services.  From an employability perspective this reinforces the
view that in the short term the most effective contribution to be made is to support
participation in the labour market for those for those out of work to get back in and have
employability programmes open to all of those who are out of work, not just those
claiming Universal Credit. 
2.6 In terms of the Council’s strategic response the employability team play a role within
the Workforce for the Future, Programme of Work P077.1, which has a broad range of
workstreams focused on ensuring that every resident has access to the support and
advice they need to secure fair and sustained employment or training in North
Lanarkshire.  This group is also engaged with employers to make sure that the advice
and support delivered meets their current and future needs in terms of skills and labour
supply.   Support into Employment is one of the key actions within the Council’s
Economic Recovery Plan, part of the Programme of Work P022.1, and this has re-
orientated existing employability programmes to ensure they are directly supporting
Page 83 of 181

Page 84

residents with all aspects of employability affected due to the pandemic impact.  A key
contribution made by the team is also to the Programme of Work P005.2, Tackling
Poverty through its general work on increasing residents’ incomes from employment
and specifically through its work on Parental Employment Support to combat child
poverty. 
3. Measures of success 
3.1 An extension to the EU funded programme is negotiated to extend the end date until
June 2023. 
4.         Supporting documentation 
4.1        None. 
Janie O’Neill
Head of Education & Families (South) 
Page 84 of 181

Page 85

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
All costs associated with the potential extension to the EU funded programme are
matched by CE714 NLC Match Funding allocated to employability projects.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Page 85 of 181

Page 86

Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?
The risk attached to the proposals is covered within the risk register for Employability
Services in relation to compliance and draw down of external funding. 
Page 86 of 181

Page 87

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref UKSPF/YW Date 29/08/22 
UK Shared Prosperity Fund Update 
From  Pamela Humphries, Head of Planning and Regeneration
E-mail Weiry@northlan.gov.uk Telephone   Yvonne Weir
07508 001238 
Executive Summary 
This report provides an update on progress and activities being undertaken to develop
North Lanarkshire’s investment priorities and interventions for the UK Shared Prosperity
Fund. 
The UK Shared Prosperity Fund (UKSPF or the Fund) is a central pillar of the UK
government’s levelling up agenda and succeeds the former EU funding received by the
UK. Funding of £2.5bn has been put in place from April 2022 to March 2025 across the UK
to provide a mix of capital and revenue funding for projects which meet the Fund’s 3
investment priorities: communities and place; support for local businesses and people and
skills. 
North Lanarkshire has received a conditional allocation of £13,871,047 of which
£11,475,646 is core UKSPF funding and £2,395,402 is ringfenced for Multiply activity to
support adult numeracy activities for individuals aged 19+. 
Following agreement by the 8 local authorities within the Glasgow City Region (GCR), a
single Investment Plan based on the investment priorities and interventions identified by
the member authorities will be submitted to the UK Government for the £73.9M of funding
allocated to GCR on 1st September 2022 subject to the approval of the Investment Plan at
the GCR Cabinet on 30th August 2022. 
Approvals of the investment plans are expected from October 2022 although spend on
activities can be incurred at risk from 1 April 2022. 
The development of the investment priorities and associated output and outcome
measures for North Lanarkshire has been developed in consultation with a range of internal
and external stakeholders and reflects agreed council priorities through the Plan for North
Lanarkshire and related Programme of Work. 
AGENDA ITEM 8
Page 87 of 181

Page 88

1. Background 
1.1 The UK Shared Prosperity Fund (UKSPF or the Fund) is a central pillar of the UK
government’s Levelling Up agenda. It succeeds the EU Structural Funds (primarily
European Social Fund and European Regional Development Fund) within the UK.
Although the concept of the UKSPF was first outlined in 2017, very little substantive
information was made available until pre-launch guidance was published on 2nd
February 2022. This was followed up by the publication of a full prospectus on 13th
April 2022 by the UK Government.
1.2 The UKSPF will provide £2.6bn of new capital and revenue funding across the UK for
local investment up to 31 March 2025. The funding is split over three financial years as
follows: £400m for 2022-23, £700m for 2023-24 and ramping up to £1.5bn for 2024-25.
1.3 All areas of the UK have received a conditional allocation of funding based on a funding
formula rather than direct competition for the funds. A total of £212m has been allocated
to Scotland (8.4% of the UK total). The share accruing to Scotland is broadly equivalent
to its share of EU Structural Funds for the 2014-20 period. The 8 authorities in the
Glasgow City Region have received a combined allocation of £73.9m which is
approximately 34.9% of the Scottish allocation.
1.4 North Lanarkshire has received a conditional allocation of £13,871,047 of which
£11,475,646 is core UKSPF funding and £2,395,402 is ringfenced for delivery of activity
under “Multiply” (i.e. activity to support adult numeracy activities for individuals aged
19+). There are pre-determined percentages for capital and revenue on an annual
basis with a minimum amount that can be spend on capital. Places can choose to
spend more on capital should they wish. Funding for Multiply is fixed and cannot be
altered. Areas can also utilise 4% of their allocation to undertake necessary Fund
administration including project assessment, contracting, monitoring and evaluation
and ongoing stakeholder engagement.  
Recommendations
It is recommended that the Committee:
(1) Considers the content of this report;
(2) Approves the proposed North Lanarkshire investment priorities as set out in
Appendix 1
(3) Notes that the Glasgow City Region Investment Plan will be submitted to the UK
Government for approval on 1st September, subject to approval at GCR Cabinet on
30th August.   
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Page 88 of 181

Page 89

1.5 North Lanarkshire’s specific allocation over the first 3-years of the Fund is broken down
as follows:
CORE UKSPF     
North Lanarkshire 22/23 23/24 24/25 Total
Core UKSPF  £1,392,675 £2,785,351 £7,297,619 £11,475,646
Multiply £724,191 £835,605 £835,605 £2,395,402
Total £2,116,866 £3,620,956 £8,133,224 £13,871,047  
Objectives of the Fund and Investment Priorities 
1.6 The UKSPF is seeking to support the UK government’s wider commitment to level up
all parts of the UK by delivering on each of the levelling up objectives:
• Boost productivity, pay, jobs and living standards by growing the private sector,
especially in those places where they are lagging
• Spread opportunities and improve public services, especially in those places where
they are weakest
• Restore a sense of community, local pride and belonging, especially in those places
where they have been lost
• Empower local leaders and communities, especially in those places lacking local
agency 
1.7 The primary goal of the UKSPF is to build pride in place and increase life chances
across the UK. Underneath this overarching aim, there are three UKSPF investment
priorities:
• Communities and place
• Supporting local business
• People and skills
In addition, the new programme “Multiply” has a specific budget within the UKSPF as
outlined above to support adult numeracy skills across all areas. 
1.8 The objectives of the Communities and Place Investment Priority are: 
• To strengthen social fabric and to foster a sense of local pride and belonging
through investment in activities that enhance physical, cultural and social ties and
access to amenities such as community infrastructure and local green space and
community led projects; and 
• To build resilient, healthy and safe neighbourhoods through investment in quality
places in which people want to live work play and learn through targeted
improvements to the built and natural environment together with innovative
approaches to crime prevention. 
1.9 The objectives of the Supporting Local Businesses Investment Priority are: 
• To create jobs and boost community cohesion, through investments that build on
existing industries and institutions and range from support for starting businesses
to visible improvements to local retail, hospitality and leisure sector facilities; 
• To promote networking and collaboration, through interventions that bring together
businesses and partners within and across sectors to share knowledge, expertise
and resources and stimulate innovation and growth; and 
• To increase private sector investment in growth enhancing activities, through
targeted support for small and medium sized businesses to undertake new to firm
Page 89 of 181

Page 90

innovation, adopt productivity enhancing energy efficient and low carbon
technologies and techniques, and to start or grow their exports. 
1.10 The objectives of the People and Skills Investment Priority are: 
• To boost core skills and support adults to progress in work by targeting adults with
no or low-level qualifications and skills in maths and upskill the working population,
yielding personal and societal economic impact and by encouraging innovative
approaches to reducing adult education barriers; 
• To reduce levels of economic inactivity through investment in bespoke intensive life
and employment support tailored to local need. Investment should facilitate the join-
up of mainstream provision and local services within an area for participants,
through the use of one-to-one keyworker support, improving employment outcomes
for specific cohorts who face labour market barriers; 
• To support people furthest from the labour market to overcome barriers to work by
providing cohesive, locally tailored support including access to basic skills; and 
• To support local areas to fund gaps in local skills provision to support people to
progress in work, and supplement local adult skills provision e.g. by providing
additional volumes; delivering provision through wider range of routes or enabling
more intensive/innovative provision, both qualification based and non-qualification
based. This should be supplementary to provision available through national
employment and skills programmes. 
1.11 The Interventions List for Scotland which is one of the accompanying documents to the
UKSPF prospectus sets out a menu of 51 suggested interventions across the three
investment priorities. Whilst places are encouraged to select from this menu, places
can also consider bespoke interventions that meet the unique needs of their community
and place. Beyond the earmarked allocation for Multiply there is flexibility regarding the
allocations areas can make across the 3 investment priorities.
1.12 In order to access the conditional allocations of funding through the UKSPF, local areas
are required to set out measurable outcomes that reflect local challenges, needs and
opportunities which inform the interventions the area wishes to deliver across the three
investment priorities. These interventions, outputs and outcomes are required to be set
out in an Investment Plan which must be submitted to the UK government for approval. 
Glasgow City Region Approach 
1.13 The pre-launch guidance encouraged, but did not mandate, the use of regional
economic partnerships (largely based on city/growth deals) as the spatial basis for
preparing Investment Plans in Scotland. 
1.14 The Glasgow City Region Cabinet, at its meeting held on 15th February 2022 agreed:
• in principle to pursue a regional approach to management of the UKSPF and to
authorise the Director of Regional Economic Growth to formally notify the UK
Government of this approach; and 
• that the Investment Plan be developed in conjunction with all 8 Member Authorities,
with all necessary approvals at both regional and local level prior to final submission
in Summer 2022. 
1.15 A Glasgow City Region Head of Shared Prosperity Fund has now been appointed and
a working group of the UKSPF Officer leads in each local authority has been
Page 90 of 181

Page 91

established. This Group meets on a regular basis and is also liaising with UK
Government representatives.
1.16 It should be noted that while the intention is to submit a single Investment Plan covering
the City Region, most of the delivery and project management will remain at local
authority level. There may be some limited interventions in future years, linked to the
priorities identified in the GCR Regional Economic Strategy, that might be undertaken
at a City Region level should there be funding available. 
1.17 Whilst the original window of submissions for investment plans was 30 June to 1 August
2022, GCR has received an extension to 1st September 2022 to enable member
authority and GCR Cabinet approvals to be sought. It is anticipated that approvals will
be made from October 2022. 
2. Report 
North Lanarkshire Investment Plan Approach 
2.1 The Council has considerable flexibility in terms of the interventions that can be
supported in North Lanarkshire as part of the Glasgow City Region Investment Plan. In
developing the local investment plan, it is proposed that the Council should deliver
selected interventions under all three investment priorities set out in the prospectus
including the Multiply intervention. 
2.2 The Investment Plan does not require the submission of fully scoped projects. Instead,
it requires the selection of interventions from the menu of 51 interventions based on
local priorities, challenges and opportunities, and indicative spend and
outputs/outcomes to be selected against them from the overall funding allocations. 
2.3 There has been engagement with a range of internal and external stakeholders to
identify and prioritise key projects, activities and interventions that could be delivered
across the three investment priorities. As outlined in the background section of this
report, the UKSPF themes, objectives and interventions are a strong fit with the
Council’s, and wider stakeholder’s, plans and strategies for the area. All the
interventions proposed for selection align and support strategic objectives identified
within key strategies and Programmes of Work including, but not limited to, the Plan for
North Lanarkshire, the Workforce for the Future Strategy, the Economic Regeneration
Delivery Plan, Developing the Young Workforce, the North Lanarkshire Community
Learning and Development Partnership Plan, the North Lanarkshire Tourism Strategy
and Action Plan, the North Lanarkshire Social Enterprise Framework and Action Plan
and the Tackling Poverty Action Plan. There is also a strong alignment to the GCR
Regional Economic Strategy and national plans, strategies and funding. 
2.4 It is proposed that in line with the flexibility offered within the UKSPF prospectus that
North Lanarkshire based interventions will be delivered through a mixture of in-house
project delivery, procurement, commissioning, grants to businesses/organisations, and
via challenge funds. The UK Government’s default approach is via challenge funds.
This mixed approach will enable third sector organisations, businesses and local
groups to bid for funding through identified challenge or grant funds within relevant
interventions as well as any procured or commissioned services. 
2.5 In addition to the consideration of new interventions, the continuation of funding for the
current EU funded activity has also been considered. This includes: Employability
Pipeline activity; the Business Recovery and Growth Fund; Lanarkshire Business
Gateway Expert Help Framework; the Smart Hub Lanarkshire and resources related to
Page 91 of 181

Page 92

undertaking delivery, monitoring and compliance of EU funding. Current EU funding will
continue into mid-late 2023 subject to Scottish Government approval of extensions to
spend. Consideration will also be required to be given to any lessons learned from
activity funded through the Community Renewal Fund which was the precursor to
UKSPF following evaluations later this year. 
2.6 An initial draft of the council’s proposed Investment Plan and likely interventions has 
been reviewed by GCR and the UK Government. The feedback on the submissions by
all 8 local authorities has been positive and synergies among several interventions
have been identified. 
2.7 Across the interventions, the proposed split of funding within each of the investment
priorities is summarised in the table below. Appendix 1 gives a breakdown of the
specific interventions and a summary of the activities that are proposed to be delivered
within each of the investment priorities. 
Yr1 UKSPF Yr2 UKSPF Yr3 UKSPF TOTAL UKSPF
Communities & Place £ 506,427 £350,000 £2,265,000 £3,121,427
Supporting Local Business £91,541 £746,083 £1,667,738 £2,505,362
People and Skills £739,000 £1,577,854 £3,072,976 £5,389,830
Multiply £695,223 £802,181 £802,181 £2,299,585
NLC Management/Admin 4%  £84,675 £144,838 £325,329 £554,842
TOTAL  £2,116,866 £3,620,955 £8,133,224 £13,871,045 
2.8 Looking more specifically at the allocations across the 3 investment priorities of
Communities and Place, Supporting Local business and People and Skills, the
proposed split between them in relation to the core UKSPF funding is as follows: 
Proportion of Available Funding: Total
Communities and Place 28%
Supporting Local Business 23%
People & Skills 49% 
The higher proportion in People and Skills reflects funding proposed for the delivery of
employability activity, the Academy Model and Developing the Young Workforce
activities aligned to the council’s Workforce for the Future Strategy.
2.9 In relation to Capital/Revenue split, the proposed capital allocation has exceeded the
minimum capital requirements. Whilst there has been no maximum for capital stated
by the UK Government, justification is required for amounts which exceed the minimum.
Officers believe the split for North Lanarkshire can be justified and is reasonable. Whilst
there is a shortfall in year 2 against the minimum, this is exceeded in years 1 and years
3 with the overall minimum exceeded over the 3 years. 
Year 1 Year 2 Year 3 TOTAL
Page 92 of 181

Page 93

Capital - NLC £          317,500 £            50,000 £      1,525,000 £         1,892,500
Capital % 24% 2% 22% 
Min Capital £          137,596 £          330,760 £      1,240,960 £         1,709,317
Min Capital % 10.4% 12.5% 17.9% 
Stakeholder Engagement 
2.10 The UKSPF prospectus stresses the importance of stakeholder engagement in the
development of Investment Plans including consultation with MPs. A series of initial
discussions, consultation events and presentations have been undertaken to-date.
These have included the North Lanarkshire Local Employability Partnership, the
Lanarkshire Economic Forum, the Tackling Poverty Officers Action Group, the North
Lanarkshire CVS Forum, the North Lanarkshire Partnership Strategic Leadership
Board, NHS Lanarkshire, and Voluntary Action North Lanarkshire. Some specific
funding requests from external bodies have been received and allocations have been
included that would enable these organisations to bid for and potentially access
funding.  
Key Dates
2.11 The following table summarises the key dates and milestones. 
DATE ACTIVITY
13 April 2022 Fund Launch
April-May 2022 Engagement sessions with local authorities and other local
partners to support the investment plan process.
April-June/July 2022 Lead local authorities work with stakeholders to develop local
investment plans.
Summer 2022 Further guidance published including guidance on monitoring
benefits and evaluation, assurance, subsidy control, branding
and publicity.
4th July 2022 Submission of high-level North Lanarkshire investment plan to
Glasgow City Region 
1st August 2022 Completion of the GCR Investment Plan
30th August 2022 GCR Cabinet Meeting to consider investment plan
1st September 2022 Submission of GCR investment plan to the UK Government
July-September 2022 Indicative investment plan assessment period for UK
government.
October 2022 onwards Anticipated date for first investment plans to be approved.
October 2022 onwards Anticipated first payment to be made to lead local authorities
1st April 2023 Second year advance payment to be made to lead local
authorities
1st April 2024 Third year advance payment to be made to lead local
authorities
31st March 2025 Three-year funding period ends 
3. Measures of success 
3.1 To maximise North Lanarkshire’s allocation of UKSPF funding totalling £13,817,047 by
31 March 2025 to achieve outputs and outcomes that positively deliver against the
priorities and ambitions of the Plan for North Lanarkshire and related Programmes of
Work. 
Page 93 of 181

Page 94

4. Supporting documentation 
4.1 The UKSPF prospectus can be viewed at:  UK Shared Prosperity Fund: prospectus -
GOV.UK (www.gov.uk) 
4.2 The UKSPF Interventions List for Scotland can be viewed at: Interventions list for
Scotland - GOV.UK (www.gov.uk) 
4.3 Appendix 1: Proposed North Lanarkshire Investment Plan Activities 
Pamela Humphries
Head of Planning and Regeneration 
Page 94 of 181

Page 95

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
An assessment is being carried out on the proposed high level North Lanarkshire
investment plan. More detailed assessments will be required on individual projects or
activities delivered under the Plan as they come on-stream. The GCR investment
plan requires detail on how the Public Sector Equality Duty has been considered in
the design of the investment plan and how it will be considered when implementing
the investment plan including the selection of projects. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
North Lanarkshire has received a conditional allocation of £13,871,047 of which
£11,475,646 is core UKSPF funding and £2,395,402 is ringfenced for Multiply
activity to support adult numeracy activities for individuals aged 19+. 
The UK Government has made £40,000 available to GCR to undertake initial
preparatory work for the Fund. 
The Council has the ability to use 4% of its allocation by default to undertake
necessary Fund administration including project assessment, contracting, monitoring
and evaluation and ongoing stakeholder engagement. Where the 4% is not fully
required, this can be used to fund interventions. Where more than 4% is required, a
case by exception can be made. 
Each lead local authority will be paid annually in advance. In 2022-23, funding will be
paid once the GCR investment plan has been signed off. In 2023-24 and 2024-25,
payment will be at the start of the financial year. Lead local authorities will receive a
grant determination letter and Memorandum of Understanding setting out Fund
requirements and obligations. It is important to note that Lead local authorities may
be asked to return any underspends at the end of each financial year unless there
are credible plans setting out how the lead local authority will utilise underspends in
the next year and/or appropriate milestones and spend have been achieved for the
previous year. 
Funding can also be back-dated to 1 April 2022 at risk. 
As well as consideration of new interventions, consideration has been made to the
continuation of the council’s current EU funded activity which includes Employability
Page 95 of 181

Page 96

Pipeline activity, Business Recovery and Growth Fund, Lanarkshire Business
Gateway Expert Help Framework, the Smart Hub Lanarkshire and resources who
undertake delivery, monitoring and compliance of EU funding. Current EU funding
which currently equates to approximately £2m of funding per annum will continue
into mid-late 2023 subject to Scottish Government approval of extensions to spend.
Consideration will also be required to the lessons learned from activity funded
through the Community Renewal Fund which was the precursor to UKSPF following
evaluations later this year. 
Should there be any underspends of annual budgets, further detail on how these will
be treated is still to be confirmed. There is no guarantee that all underspends can be
carried forward but the UK Government had advised it will consider credible plans
setting out how the lead local authority will utilise underspends in the next year
and/or appropriate milestones and spend have been achieved for the previous year. 
Whilst no match funding is required under the UKSPF to access the allocation or will
be considered as part of the assessment criteria, local authorities are being strongly
encouraged to consider match funding from the private, public and third sector when
selecting interventions under the communities and place and support local business
priorities. It has been agreed by GCR Chief Executive’s Group that each member
authority will determine match funding requirements at a local level. It has been
proposed for North Lanarkshire that match funding will be sought where available to
maximise impact and reach of the UKSPF but that this will not prevent activities from
being taken forward where there is no match available. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Approval has been received to appoint an Enterprise Development Manager with a
focus on funding to oversee the development, management and delivery of the
UKSPF and other external funds. There are existing staff across the council who are
currently involved in the delivery, monitoring and compliance of existing EU funded
and Community Renewal Fund activities. It is anticipated these staff will support the
monitoring and compliance of the UKSPF as EU/CRF activities decrease and
UKSPF activities come on-stream and increase in scale. 
A number of interventions notably through People and Skills and Multiply
interventions may require additional staffing resources to manage and delivery
project activity. 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 96 of 181

Page 97

GCR as Lead local authority will receive a grant determination letter and
Memorandum of Understanding from the UK Government setting out Fund
requirements and obligations. This will require to be reviewed by Legal and
Democratic Solutions. It is anticipated that an agreement will be put in place
between GCR and the 8 local authorities following an approach similar to that of City
Deal governance through the current assurance frameworks. Any external projects
funded in North Lanarkshire will also require appropriate partnership, grant or legal
agreements to be put in place. 
It should be noted that previous experience through the Community Renewal Fund
also suggests that any formal legal agreements received from the UK government
may be based on English as opposed to Scots Law. 
There may be legal impacts including subsidy control which will require to be
considered depending on interventions selected. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☒ No ☐
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☒ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
There are interventions within the UKSPF which relate to both connectivity and
digital skills, giving opportunities for funding for funding of community digital
infrastructure and digital skills (people and business) in line with the emerging North
Lanarkshire digital skills plan, and links to the work of the connectivity services
framework. 
In addition, case management, monitoring and reporting systems may require to be
reviewed or developed. 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Page 97 of 181

Page 98

There are opportunities for interventions to be supported through the UKSPF in this
area both under Communities and Place and under Supporting Local Businesses. 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Communication and engagement are a critical element of the UKSPF. Local
authorities are required to engage with local partners, stakeholders, national
agencies Scottish Government, UK Government, MSPs and MPs. 
Any activity delivered will require to follow UK SPF branding and publicity guidelines. 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
A full risk assessment will be undertaken. The GCR level investment plan will
incorporate detail of risks and issues including contingency measures which will be
in place to mitigate them. Any key fraud risks will also be fully detailed in the GCR
level investment plan. The following have been highlighted as key local risks at this
early stage:
- Late approval of the GCR Investment Plan resulting in year 1 underspend or
delays in implementation. This includes potential risk for any projects which
commence prior to approval.
- The inability to carry forward underspends or ringfence local underspends for
North Lanarkshire. This requires further agreement on treatment of
underspends by GCR.
- The impact of future council savings on any match funding, staffing and
project delivery.
- The inability to recruit or retain key project delivery staff.
- The inability to deliver against proposed outputs and outcomes.
- Failure of delivery by any grant funded, partnership, challenge fund or
procured services.
- Cessation of UKSPF funding at 31 March 2025.
- Delays in delivery of capital expenditure due to contractor or supply chain
issues.
To mitigate against these risks, a robust agreement will be required at GCR level for
the delivery of the GCR investment plan. At a local level, robust governance,
project/contract/grant management systems and monitoring and evaluation
frameworks will require to be put in place to mitigate against the risks. 
Page 98 of 181

Page 99

Appendix 1: Proposed North Lanarkshire Investment Plan Activities
Table 1: Communities and Place - £3,121,427
Intervention Summary of Proposed Activity Total UKSPF
Allocation
Currently
EU
Funded
S2 Strathclyde Park Green Growth
Accelerator match funding to support 'net
zero' redevelopment of the watersports
centre
£400,000 No
S5 Funding to support cycle facilities at
Bellshill Gateway and a Challenge fund to
enhance sports, arts, cultural, heritage and
creative activities, projects and facilities
£642,500 No
S6 Funding to support the Ravenscraig Active
Travel project and a Challenge fund to
support Active Travel projects
£550,000 No
S7 Support for local tourism marketing to
increase visitors and support employment
in the sector
£120,000 No
S8 Support for volunteering initiatives to help
expand volunteering opportunities across
North Lanarkshire
£220,000 No
S9 Support for community empowerment and
capacity building and delivery of the 9
Local Outcome Improvement Plans
£750,000 No
S10 Support to enhance advice and assistance
for those facing fuel poverty
£150,000 No
S11 Support for feasibility studies for active
travel or other activities that could be
funded under the Communities and Place
interventions
£75,000 No
S12 Challenge fund to support community
organisations improve their digital
connectivity
£213,927 No
TOTAL  £3,121,427 
Table 2: Supporting Local Business - £2,505,362
Intervention Summary of Proposed Activity Total UKSPF
Allocation
Currently
EU
Funded
S14 Challenge Fund to support the
development of tourism facilities
£150,000 No
S15 Grant funding and support for businesses
to help increase start-ups, growth,
investment and employment opportunities,
including support to introduce new digital
technology and advanced manufacturing
technology
£1,300,000 Yes
S19 Targeted support to help increase
business start-ups and encourage
£295,362 No
Page 99 of 181

Page 100

entrepreneurs in excluded/under-
represented groups
S20 Continuation of expert help framework to
support SME business growth and
bespoke support for businesses to
transition to Net Zero and/or create green
jobs
£550,000 Yes
S22 Funding to help support growth and
capacity building of social enterprises
across North Lanarkshire 
£210,000 No
TOTAL  £2,505,362 
Table 3: People and Skills - £5,389,830
Intervention Summary of Proposed Activity Total UKSPF
Allocation
Currently
EU Funded
S31 and S35 Employability support, programmes and
funding to support those furthest from the
labour market
£3,439,830 Yes
S36 and S38 Support to develop skills academies to
support North Lanarkshire residents
seeking employment – focus will be on
digital skills, construction and health and
social care 
£1,050,000 No
S29 Support to expand support programmes to
help vulnerable young people achieve
positive post-school destinations
£900,000 No
TOTAL  £5,389,830 
Table 4: Multiply - £2,299,585
Intervention Summary of Proposed Activity Total UKSPF
Allocation
Currently
EU Funded
S42 Integrated maths in the community
programme to provide bespoke and
tailored numeracy learning
£1,920,327 No
S49 Delivery of training to improve financial
literacy for people with debt problems
£379,258 No
Total  £2,299,585 
Page 100 of 181

Page 101

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref SC/KH Date 29/08/22 
Contract Award - Business Intelligence Hub 
From  Head of Business & Digital Solutions   
Email  hassellk@northlan.gov.uk Telephone 07903 096121 
Executive Summary 
The Business Intelligence Hub (BI Hub) is a key strategic function that performs several roles
relating to business information, reporting and insight including: 
• utilising statistical techniques to draw insight from data in order to support strategic and
operational decision-making. 
• validation and distribution of information to support statutory and regulatory
requirements, and 
• production of reports and dashboards for differing stakeholder groups including
corporate and service management teams, elected members, statutory and regulatory
bodies, and partner agencies. 
Phases 1-3 of the BI Hub development were drawn down from the contract approved by the
former Transformation and Digitisation Committee in 2019 for the Council’s System Integration
Partner, Agilisys Limited.  With that contract recently ending and with further developments
planned it is essential to ensure the continuation of development and delivery of this key
strategic asset.
To maximise the previous knowledge and experience of our private sector partner Agilisys
Limited, and after seeking advice from the Head of Assets and Procurement it was agreed that
a call-off contract for consultancy from the Crown Commercial Services GCloud12 Framework
services was the appropriate route for procurement for development and delivery of Phase Four
of BI Hub providing best value to the Council.
As Council was in recess, the Clause 21.3.2 within the General Contract Standing Orders
(GCSO) was invoked which states “Between Committee cycles where there is no appropriate
Committee available then the Chief Executive or the appropriate Executive Director (substitutes
may not act) may instruct the Head of Assets and Procurement (or in his absence the Head of
Legal and Democratic Solutions) to accept tender orders in order to expedite the contract award
process”.
With such a clause being applied, it is thereafter a requirement of the GCSOs for the contract
award to be reported to the next appropriate Committee.
Recommendations
The Committee is requested to:
AGENDA ITEM 9
Page 101 of 181

Page 102

1. Background 
1.1 As previously reported to the former Transformation and Digitisation Committee in
February 2022, the Business Intelligence (BI) Hub provides capacity within the council to
provide information, intelligence, and insights on service delivery with the key objectives
being, to reduce the volume and complexity of current reporting and achieve a shift to
future state forecasting to support key strategic decision making at both a policy and a
service level within the council. 
1.2 Changes in business and working practices mean the Council now requires access to data
and intelligence any time, anywhere and in a format that supports insightful informed
decision making. 
1.3 It is crucial therefore that the future business intelligence model: 
• ensures more effective use of business intelligence in the delivery of services;
• supports decision making that is supported by data and insight and drives
efficiency, and
• uses business intelligence to focus resources where they are needed. 
1.4 To support this the council needs a flexible operating model for business intelligence which
is scalable across the organisation and ensures we have the right people with the right
skills supported by the right technology. 
2 Report 
2.1 Phases One to Three of the BI Hub development were completed through the previously
approved System Integrator contract with Agilisys Limited during the period October 2020
to April 2022.  Following the completion of that contract in April 2022 and with future phases
of the BI Hub development already planned to assist with the delivery of the Council’s Data
Governance Framework and Data and Information Management Strategic Roadmap
advice was sought on the route to market for the delivery of Phase Four. 
2.2 As Council was in recess, the Clause 21.3.2 within the General Contract Standing Orders
(GCSO) was invoked which states, “Between Committee cycles where there is no
appropriate Committee available then the Chief Executive or the appropriate Executive
Director (substitutes may not act) may instruct the Head of Assets and Procurement (or in
his absence the Head of Legal and Democratic Solutions) to accept tender orders in order
to expedite the contract award process.” 
2.3 With such a clause being applied, it is thereafter a requirement of the GCSOs for the
contract award to be reported to the next appropriate Committee. 
1) homologate the approval of the award of the Contract to Agilisys Limited at the
maximum value of £567,975 exclusive of VAT for a period of 11 months which
commenced on 1 May 2022.   
2) otherwise note the content of the report.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Page 102 of 181

Page 103

2.4 The Contract is for period of 11 months and commenced on 1 May 2022. The value of the
Contract shall not exceed £567,975 Pounds Sterling exclusive of VAT. 
2.5 A key element of delivery in Phase Four will be knowledge transfer and upskilling of 
council staff to allow the organisation, as far as possible, to be self-sufficient in BI Hub
development and delivery by the end of Phase Four in March 2023. This will include
learning exchanges, training, job shadowing and mentoring support from the agreed
provider.  Should we require it there is a progress review at the 6-month point. 
2.6 In addition during Phase Four Agilisys will: 
• prepare technical and user documentation for each dashboard and make available
to NLC in appropriate libraries
• provide training/support/job shadowing to NLC staff to ensure knowlwdge transfer
on each dashboard development, design and build. 
3 Measures of success 
3.1 Success can be demonstrated through the outcomes detailed within The Plan for North
Lanarkshire being effectively monitored, and the corresponding data being available to the
people who need it, when they need it, and in a way for it to be used to improve our decision
making and service delivery.  
4. Supporting documents 
4.1 Not applicable 
Katrina Hassell
Head of Business and Digital Solutions 
Page 103 of 181

Page 104

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐ 
All financial information is contained within the body of the report, with all costs of the
project included within the DigitalNL investment model, regularly reported to the
former Transformation and Digitisation Committee and Policy and Strategy
Committee. 
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
Financial Solutions routinely monitor spend against the DigitalNL Investment model. 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 104 of 181

Page 105

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Iterative deployment of the Business Intelligence hub across council services
provides great opportunity to improve the Council’s data management practices and
data maturity score, with the Council ultimately looking to map to the ‘advancing’
stage outlined within its approved Data and Information Management (IM) Strategic
Roadmap. 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Page 105 of 181

Page 106

Page 106 of 181

Page 107

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref JMcB/KH Date 29/08/22 
Contract Award – Unix Support Services 
From  Head of Business & Digital 
Email  hassellk@northlan.gov.uk Telephone 07903 096121   
Executive Summary
Following consideration and approval by the former Transformation and Digitisation
Committee in November 2021, the Council insourced its ICT Service Delivery Contract
from Wipro Holdings (UK) Ltd (Wipro) effective April 2022. 
In recommending operations be insourced, Business and Digital identified Unix skills as an
area of risk, advising termination assistance would be sought from Wipro in the first
instance to maintain continuity of maintenance and support of the Unix Server estate
pending a longer-term procurement exercise. Such maintenance and support therefore
remained the responsibility of Wipro Ltd under transitional support arrangements, at a
monthly cost of £20,000. 
The current arrangements are no longer sustainable however due to staffing changes
within Wipro Ltd, with an alternative arrangement now required as a matter of urgency. 
The award of the Contract was completed by conducting a direct award using the
Negotiated Tender Procedure (NTP) procedure, in accordance with Regulation 33 of the
Public Contracts (Scotland) Regulations 2015 and the Council’s General Contract Standing
Order (GCSO) 9.4.1. This award was a reactive measure to address immediate support
requirements.
Recommendations
Members of the Committee are requested to: 
(1) Acknowledge the synergies with Datavita as outlined in the report.
(2) Approve the award of the contract to Datavita Ltd for the value of one hundred and
forty eight thousand, one hundred and eighty five Pounds Sterling (£148,145)
exclusive of VAT through the NTP procedure.
(3) Otherwise note the report.
The Plan for North Lanarkshire 
Priority  All priorities
Ambition statement All ambition statements
AGENDA ITEM 10
Page 107 of 181

Page 108

1. Background 
1.1 On 1 April 2022 the managed ICT Service Delivery Contract, which had been under
contract with Wipro Ltd was insourced.  At that time the support of the Unix estate
remained under contract with Wipro Ltd as part of the contract termination assistance. 
1.2 The service provides maintenance and support of the Unix server estate and underlying
operating system. The Council has 4 Enterprise Class Unix servers on which key
applications are deployed including: 
(i) Housing Management System (HSMS) – which includes modules for the
management of Housing and Property Repairs, Homelessness, Anti-Social
Behaviour, Rent Accounting and Housing Allocations;
(ii) Social Work Information System (MySwis) - which includes modules for the
management of Social Work Cases, Justice and Home Care;
(iii) Planning and Building Control (UNI-form);
(iv) Financial Management (eFinancials);
(v) Municipal Bank and Home Insurance. 
1.3 As advised to the former Transformation and Digitisation Committee in May and
November 2021, the Council did not have Unix support capabilities and resources in-
house and would therefore need to seek ongoing third-party provision. To maintain
immediate continuity though, these support services were continued through Wipro’s
transitional support arrangements following insourcing of the main contract. 
1.4 Any service failure in the underlying Unix hardware or operating system on which these
applications are deployed would have a severe impact on our ability to deal with critical
situations and help vulnerable groups within our community, impacting negatively on
customers and our reputation. 
2. Report 
2.1 The management and support services being procured were previously provided by a
Service Delivery Partner, Wipro Ltd, whose contract with NLC ended on 31st March
2022. Under the Termination Assistance clause, Wipro Ltd will continue to provide
support for up to 6 months on a rolling monthly basis. The costs associated with this
are approximately £20,000 per month. 
2.2 HFD Datavita Limited are the providers of our secondary data centre facilities which
includes 2 of the 4 Unix servers, amongst other Windows based servers, all of which
are used for high availability, fail-over and disaster recovery capabilities. 
2.3 HFD Datavita Limited have the capability to supply a managed service for this support,
however, this was not part of the initial procurement for Datacentre hosting. There is
clear synergy between these two requirements that is uniquely beneficial to the Council.
The current contract with HFD Datavita Limited is about to enter year 3 of 3 with a
potential 1-year extension. 
Page 108 of 181

Page 109

2.4 The Council will continue to require a secondary hosting environment for the
foreseeable future and will be conducting a further procurement for hosted services
before the end of this financial year, it is intended that this will include additional
requirements such as Unix support. 
2.5 This NTP proposes that a 1 year contract be awarded to HFD Datavita Limited for Unix
support services, so that the proposed future procurement can then seek the most
advantageous combined award. Due to the tight timescales and the high costs
associated with the transition support being provided by Wipro, the proposal that has
been submitted by HFD Datavita Limited provides NLC with best value and allows NLC
to obtain the required support from a trusted existing supplier.   
2.6 The Wipro support that is currently in place was only intended to be a short-term
measure as current support is provided by a single individual located in England. Unix
support tends to be in high demand therefore giving rise to a major risk of our nominated
resource finding employment elsewhere or being redeployed by Wipro internally.
Indeed, the Council was recently advised this individual has submitted his notice at
Wipro. He left the organisation on 5 August 2022, creating an emergency for the
Council, given Wipro Ltd only had a single resource available with Unix support skills. 
2.7 With this change in circumstances, Regulation 33 of the Public Contracts (Scotland)
Regulations 2015 was invoked with a proposal for a 1-year NTP with HFD Datavita
Limited. 
2.8 Having followed the General Contract Standing Order (GCSO) and discussed the
requirement, approved through the Enterprise Architecture Governance Group
(EAGG), with the Heads of Asset and Procurement Solutions and Legal and
Democratic Solutions, the Head of Business and Digital determined the Negotiated
Tendering Procedure (NTP) was appropriate to use in this instance. 
3. Measures of success 
(a) Supporting the works of the Digital Community, Digital Economy and Digital Council. 
4. Supporting documentation 
N/A 
Katrina Hassell 
Head of Business and Digital 
Page 109 of 181

Page 110

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐ 
All financial information is contained within the body of the report, with all insourcing
costs – including Unix support – previously included within relevant reports to the
former Transformation and Digitisation Committee. 
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 110 of 181

Page 111

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Paragraph 1.2 details the business-critical nature of supporting the underlying Unix
operation system. 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Paragraph 2.8 confirms discussion has taken place at this key governance group. 
Yes ☒ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Paragraph 1.2 highlights the business-critical nature of Unix support, which
paragraph 2.6 above highlights is in high demand. Lack of Unix support therefore
presents a major risk to Council operations. Whilst Regulation 33 of the Public
Contracts (Scotland) Regulations 2015 appropriately permits a one-year NTP, scope
for challenge may still exist given termination assistance from Wipro was a known
factor. 
Page 111 of 181

Page 112

Page 112 of 181

Page 113

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC-CPT-21-110 Date: 29/08/2022
Contract Award for a Conservation Architect Design Team Framework
Agreement 
From Pamela Humphries, Head of Planning and Regeneration
E-mail hodges@northlann.gov.uk Telephone Stuart Hodge, Project Development
Manager – 07583 091571
Executive Summary
This report is to advise Committee of the decision taken in accordance with condition 21.3.2 of the
Council’s General Contract Standing Orders (GCSO’s) where in the absence of committee, the Chief
Executive approved the award of a Conservation Architect Design Team Framework Agreement (the
“Framework Agreement”) on 09 June 2020, with the four (4) tenderers listed below appointed: 
• MASTARCH Limited t/a MAST Architects;
• Page \ Park Limited;
• Robert Potter and Partners LLP; and
• Smith Scott Mullan + Associates Limited.
Following successful conclusion of the required standstill period, the Framework Agreement was
formally awarded on 23 June 2022.
The Framework Agreement is for an initial period of 24 months and commenced on 01 July 2022
and will initially expire on 30 June 2024. The Council reserves the right to extend the Framework
Agreement for two (2) additional 12-month periods until 30 June 2026.
The maximum value of the Framework Agreement shall not exceed Three-Million Pounds Sterling
(£3,000,000.00) exclusive of VAT.
Recommendations
It is recommended that Committee acknowledges the award of the Framework Agreement in
accordance with GCSO 21.3.2 at the maximum value of Three-Million Pounds Sterling
(£3,000,000.00) exclusive of VAT with the four (4) tenderers listed above appointed.
This recommendation follows the completion of a procurement procedure in accordance with the
Public Contracts (Scotland) Regulations 2015 and the Council’s GCSO’s, where the tenders
recommended for award were evaluated as providing the most economically advantageous tenders
in terms of cost and quality for the Council.
AGENDA ITEM 11
Page 113 of 181

Page 114

The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes 
Ambition Statement (2) Refocus our town centres and communities to be multi-functional
connected places which maximise social, economic, and environmental
opportunities 
1. Background 
1.1 The Council has a positive plan for North Lanarkshire, its businesses and its people, boosting
the local economy and creating jobs. The Council has one of the fastest growing economies
in Scotland before the health emergency and an independent report shows that the Council
is one of the best-placed councils to withstand the economic impact of coronavirus. The
Council still plans to invest £3.5billlion over the next 10 years, which, along with private sector
inward investment, will create around 12,000 jobs and generate an additional £1billion for the
local economy. 
1.2 The Councils “Growth Team” was formed in January 2019 with the remit of developing and
managing physical regeneration projects within North Lanarkshire town centres undertaken
as part of the Council’s “Ambition Programme”. This Programme will deliver an ambitious
regeneration agenda set out within the Economic Regeneration Delivery Plan (ERDP),
particularly regarding reshaping and renewing North Lanarkshire’s town centres. The Council
is making significant progress, with investment and development happening in all our towns
and communities. 
1.3 As part of this agenda, the Council is investigating ways in which we can identify, purchase,
and redevelop key buildings and / or land within our town centres. This initiative is intended
to renew buildings that have become unused or underutilised in order to reinvigorate the town
centres with the added benefit of increasing footfall to local businesses. The primary focus of
redeveloping these buildings to date has been for them to be converted into social housing
as part of the council’s new supply programme, but other outcomes may be more suitable
depending on the location of the building, surrounding uses and residential requirements in
a particular location. 
1.4 Additionally, The Council has an approved programme to deliver 5,000 new homes by 2035.
The Councils New Supply Team is responsible for the delivery of this large- scale programme
and its challenges, not least, the procurement of design consultants and contractors to build
the houses to the required standard, within the timescale required and at a competitive cost. 
1.5 Accordingly, the Council intends to implement a framework agreement to enable appointment
of multiple conservation architect consultants to lead a multi-disciplinary design team that
includes (but not limited to) structural / civil engineers, quantity surveyors, and specialist
surveyors as required (i.e., rot, asbestos, traffic, acoustic etc.) to provide options for design
and project management services for the conversion of selected buildings. This approach
should provide the Council with a direct route to market for future projects as and when they
are identified. 
1.6 The requirements of the Framework Agreement have never been contracted before by the
Council therefore historical contract information is not available. 
Page 114 of 181

Page 115

2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions and
trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the Framework
Agreement. 
2.2 The initial estimated value of the Framework Agreement dictated that the procurement
procedure be undertaken in accordance with the Public Contracts (Scotland) Regulations
2015. An advert for the contract opportunity was published on the Public Contracts Scotland
and the UK Find a Tender (FTS) website. 
2.3 The procurement procedure was undertaken as an “Open Procedure” Based on the
evaluation criteria and scoring methodology set out in the invitation to tender package within
the procurement procedure, an evaluation of tender responses was completed by members
identified by the UIG. Selection stage responses were assessed first and compliant tenderers
that satisfied / declared that they met the published minimum selection stage criteria
progressed to the award stage evaluation. Following identification of the recommended
tenderer(s), their selection stage responses were assessed in more detail to ensure they
satisfied the minimum selection stage criteria applied 
2.4 The Framework Agreement award recommendation is made on the basis of the tenderer’s
that submitted the most economically advantageous tenders. 
2.5 It was the Council’s intention to appoint a maximum of six (6) consultants to the Framework
Agreement. Following the evaluation of tenders received in terms of quality and price, and in
line with the conditions applied within the invitation to tender documents, the Council
proposed to appoint eight (8) consultants to the Framework Agreement as the 7th and 8th
ranked tenderers total scores were within 1.00 of the 6th ranked tenderer. 
However, when undertaking the “Request for Documentation” stage of the evaluation process
to ensure all tenderers recommended for appointment satisfied the minimum selection stage
criteria applied within the procurement procedure, four (4) tenderers failed to demonstrate
sufficient previous experience to that required within the scope of the Framework Agreement. 
As four (4) of the eight (8) tenderers identified for appointment to the Framework Agreement
failed to demonstrate sufficient previous experience, an assessment of the 9th ranked
tenderer was also undertaken to ascertain whether they could demonstrate sufficient
previous experience that would enable them to be recommended for appointment in line with
the Councils intention to appoint a maximum of six (6) consultants to the Framework
Agreement. However, following an assessment of the 9th ranked tenderer’s previous
experience examples, they were also assessed to be unable to satisfy the minimum selection
stage criteria applied within the procurement procedure 
Accordingly, the tender(s) submitted by the four (4) tenderers listed below were
recommended for appointment to the Framework Agreement: 
• MASTARCH Limited t/a MAST Architects;
• Page \ Park Limited;
• Robert Potter and Partners LLP; and
• Smith Scott Mullan + Associates Limited.
Page 115 of 181

Page 116

2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
2.7 The value of the Framework Agreement is Three-Million Pounds Sterling (£3,000,000.00)
exclusive of VAT including any option to extend the Framework Agreement. 
2.8 The costs associated with contract delivery will be contained within the capital budgets for
the Growth Team, Planning and Regeneration and any additional external funding that can
be achieved. Additionally, the New Supply Team within Planning and Regeneration may also
access the Framework Agreement via their capital and Housing Revenue Account (HRA), as
well as any additional external funding that can be achieved. 
Price Savings / Increases 
2.9 The Framework Agreement is not expected to deliver cashable procurement savings. Any
savings that may come to fruition within the Framework Agreement shall be reinvested into
specific projects to maximise improvements and outlays with the Councils town centre / urban
environments. 
Price Stability 
2.10 Rates received shall be firm for the initial 24-months of the Framework Agreement.
Subsequent to that initial period, there is provision within the Framework Agreement for
recommended tenderer’s to request annual reviews of their submitted “Day Rates” however
these will require to be no greater than the current National Retail Price Index. It will be at the
sole discretion of the Council whether to accept or reject any pricing amendments proposed. 
Community Benefits 
2.11.1 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.11.2 Within tenders submitted by tenderer’s recommended for appointment to the Framework
Agreement, the following community benefits within the Framework Agreement:   
Community Benefit Type Quantity
Committed
Graduate Initiatives 1
Educational Visits 9
Industry Awareness Events  9
Financial Support for a Community Project / Organisation 2
Non-financial support for a Community Project / Organisation 5
Work Experience Placements (14 to 16 years of age) 7
Work Experience Placements (16+ years of age) 4
Page 116 of 181

Page 117

A significant number of community benefits have been committed to within the contract award
procedure as a whole. However, the delivery of selected community benefits will only be
applicable in the event a consultant appointed to the Framework Agreement is awarded a
call-off contract. 
2.11.3 The community benefits delivered as part of the Framework Agreement includes the creation
of jobs or apprenticeships. 
Fair Work First  
2.12 Within tender’s received for the four (4) consultants identified for appointment to the
Framework Agreement confirmed commitment to the Scottish Government’s “Fair Work First”
initiative with all four (4) confirming they have a Living Wage Policy and three (3) out of the
four (4) confirming that they are accredited Living Wage providers. 
Contract Strategy 
2.13 Officers from the Growth Team, Planning and Regeneration will be responsible for managing
the Framework Agreement and all appropriate call-off contracts, all of which will be
undertaken in accordance with the Councils agreed approach to contract and supplier
management. 
3. Measures of success 
The Framework Agreement will deliver the following outcomes; 
3.1 The appointment of a consultants who have the experience and capability to deliver
innovative, high quality and responsive conservation led architect design team that will deliver
the minimum delivery targets within the Framework Agreement;
3.2 The Framework Agreement award procedure is compliant with the procurement legislation
and internal procedures; 
3.3 That best value is both demonstrable and achieved; 
3.4 That the Framework Agreement secures a range of community benefits; 
3.5 That the Framework Agreement secured a number of “Fair Work First” initiatives; 
3.6 That the Framework Agreement performance is proactively managed against a number of
local Key Performance Indicators and national targets; and 
3.7 A collaborative approach to the procurement of the requirement, minimising the burden on
internal resource and leveraging the economies of scale. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Page 117 of 181

Page 118

Appendix 3 SME Status and Location of All Tenderers 
Pamela Humphries
Head of Planning and Regeneration 
Page 118 of 181

Page 119

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
5.2 Financial Impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
5.3 HR Policy Impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
5.4 Legal Impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
5.5 Data Protection Impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
5.6 Technology / Digital Impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?  
Yes ☐ No ☒  
5.7 Environmental / Carbon Impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Environmental / Carbon Neutral Costs will be paramount within relevant design costs given
the Councils carbon neutral targets. 
5.8 Communications Impact  
Page 119 of 181

Page 120

Does the report contain any information that has an impact on the council’s communications
activities? 
Yes ☐ No ☒ 
5.9 Risk Impact 
Is there a risk impact?  
Yes ☐ No ☒  
Page 120 of 181

Page 121

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name
Total
Tender
Score (%)
Recommended
for Appointment 
1 Smith Scott Mullan + Associates Limited 83.81% Yes
2 Robert Potter and Partners LLP 83.36% Yes
3 Collective Architecture Limited 81.57% No*
4 Loader and Monteith Architects Limited 79.47% No*
5 MASTARCH Limited t/a MAST Architects 76.90% Yes
6 Wylie Shanks Architects LLP 76.73% No*
7 Page \ Park Limited 76.58% Yes
8 Austin-Smith:Lord Limited 75.86% No*
9 Stallan-Brand Architecture + Design Limited 71.60% No* 
* Tenderer failed to demonstrate sufficient previous experience to that required within the scope of
the Framework Agreement.
Page 121 of 181

Page 122

Appendix 2 – Summary of Procurement Process 
Response
Procurement Procedure Utilised: Open Procedure
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations
2015
Date Contract Strategy Approved: 25 February 2022
Date Contract Notice Published: 28 February 2022
Total Expressions of Interest Received: 47
NLC Based of Expressions of Interest: 0
Tender Return Deadline: 12 noon, 05 April 2022
Number of Tenders Received: 9
Tenders Received from SME’s: 9
Tenders Received from NLC Based Tenderers:  0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 9
Number of Recommended Tenderers: 4
Basis of Award: Quality: 70% Price: 30%
Evaluation Team: Officers from the Growth Team, Planning
and Regeneration
Approval Obtained via GCSO 21.3.2: 09 June 2022
Standstill Period Commenced: 10 June 2022
Standstill Period Expired: 20 June 2022
Framework Agreement Award Date: 23 June 2022
Framework Agreement Start Date: 01 July 2022
Total Contract Period (Months): 24 + 12 + 12 (48 Total)
Maximum Total Framework Agreement Value: £3,000,000.00 
Page 122 of 181

Page 123

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Austin-Smith:Lord Limited Medium Liverpool City
Collective Architecture Limited Small Glasgow City
Loader and Monteith Architects Limited Micro Glasgow City
MASTARCH Limited t/a MAST Architects Small Glasgow City
Page \ Park Limited Small Glasgow City
Robert Potter and Partners LLP Small South Ayrshire
Smith Scott Mullan + Associates Limited Small City of Edinburgh
Stallan-Brand Architecture + Design Limited Small Glasgow City
Wylie Shanks Architects LLP Micro Glasgow City 
Page 123 of 181

Page 124

Page 124 of 181

Page 125

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: LN/LO Date: 29 August 2022 
Contract Award for Ravenscraig Multidisciplinary Project Services 
From  Pamela Humphries , Head of Planning and Regeneration 
E-mail nobleyl@northlan.gov.uk Telephone Lyndsay Noble
07970 016256 
Executive Summary 
Committee is asked to note the award of a contract for Ravenscraig Access Infrastructure North –
Multidisciplinary Project Services (the ‘Contract’) to Amey OW Limited.  The award of contract has
been approved by the Chief Executive, in accordance with the Council’s General Contract Standing
Orders (June 2022), to expedite the contract award in the absence of the Committee meeting in
Cycle 2. 
The Contract is for an initial period of 72 months with a commencement date of 28 June 2022. 
The value of the Contract shall not exceed one million, nine hundred and ninety-two thousand, eight
hundred and twelve Pounds Sterling (£1,992,812) exclusive of VAT. 
Recommendations 
It is recommended that Enterprise, Growth and Fair Work Committee notes the action taken to award
the Contract to Amey OW Limited at the maximum value of one million, nine hundred and ninety-two
thousand, eight hundred and twelve Pounds Sterling (£1,992,812) exclusive of VAT. 
This recommendation follows:
1. The completion of a procurement procedure, where the tender recommended for award has been
evaluated as providing the most economically advantageous tender in terms of cost and quality
for the council.
2. Instruction by the Chief Executive to the Head of Assets and Procurement Solutions to accept
the Tender. 
The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes 
Ambition Statement (5) Grow and improve the sustainability and diversity of North Lanarkshire's
economy
AGENDA ITEM 12
Page 125 of 181

Page 126

1. Background 
1.1 The requirements of the Contract have never been contracted before by the council therefore
historical contract information is not available. 
1.2 The Ravenscraig Access Infrastructure North (RAI North) project, as per extant planning
permission ref 13/01279/FUL, is being progressed under the Glasgow City Region (GCR)
City Deal programme as one part of the wider Ravenscraig Access Infrastructure project
being delivered in phases to improve strategic connections, north from Ravenscraig to the
M8 and south to Motherwell and the M74, in support of the ongoing redevelopment of
Ravenscraig under the 2020 approved revised masterplan. 
1.3 The RAI North project will improve the strategic road link, and provision for active travel, north
from Ravenscraig to the M8 along the A723/B799 road corridor. 
1.4 A consultant team to provide multidisciplinary project services has been procured to further
develop proposals on the basis of the 2013 extant planning permission and in consideration
of current design guidance and principles. 
1.5 The award of Contract follows approval by the council’s Enterprise and Housing Committee
in May 2018 to procure Professional Services to develop the Ravenscraig Infrastructure
Access in accordance with the GCR City Deal Procurement Strategy and the phased
programme for delivery as presented in the Outline Business Case approved by Enterprise
and Growth Committee in August 2020 and by the GCR City Deal Cabinet in October 2020.   
1.6 The Contract award is for professional services to progress the RAI North project through
detailed design and construction including:
• Engineering and landscaping design 
• Pre-construction CDM
• Preparation of works tender information and assessment of contractor submissions
• Management of the works contract including cost consultancy and quantity surveying
• Site supervision and quality control. 
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions and
trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the council via the Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a “Mini Competition” from the Scotland Excel 
framework agreement for Engineering and Technical Consultancy Services. 
2.4 The Contract award recommendation is made on the basis of the tenderer who submitted the
most economically advantageous tender.
Page 126 of 181

Page 127

2.5 The tender submitted by Amey OW Limited has been evaluated as representing the most
economically advantageous tender for this Contract. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
2.7 The maximum Contract value of £1,992,812 exclusive of VAT comprises the following costs: 
• Professional services Contract to a value of £1,788,912;
• A provisional sum of £100,000 for surveys and assessments to develop the
engineering and landscape design;
• A 5.5% council continency to a value of £103,900 to be held during the design and
construction period. 
2.8 The costs associated with contract delivery will be contained within the capital budget for the
Ravenscraig Access Infrastructure project as provided under the GCR City Deal programme
and the council’s capital programme. 
Price Savings / Increases 
2.9 There are no cashable savings attributed to the Contract. 
Price Stability 
2.10 The pricing mechanism is a Priced Contract with Activity Schedule offering a good level of
cost certainty. 
Community Benefits 
2.11.1 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.11.2 Within their tender, Amey OW Limited committed to deliver the following community benefits
within the Contract:  
Community Benefit Type Quantity
Committed
SKL03 Work Experience Placement - Foundation Apprenticeship 4
SKL05 Work Experience Placement - School 5
SKL06 Work Experience Placement - Non School 5
SKL07 Careers Events 5
SKL08 Workplace Visit 5
EMP02 New Employee Full Time Job (non-Priority Group) 1
COM02 Non-financial support for a community project (minimum 5 hours). 7
COM01 – Financial Support for a community project (minimum £1k) 1
Page 127 of 181

Page 128

2.11.3 The community benefits delivered as part of the Contract includes apprenticeships. 
Fair Work First  
2.12 All contractors appointed to the Scotland Excel Engineering and Technical Consultancy
Framework have evidenced Fair Work practices and demonstrated how they will promote
them in the delivery of contract call-offs from the Framework. 
Contract Strategy 
2.13 Officers from Enterprise Projects will be responsible for managing the Contract which will be
undertaken in accordance with the council’s agreed approach to contract and supplier
management. 
3. Measures of success 
3.1 The Contract, through the provision of design and project management services, will facilitate
the delivery of strategic road infrastructure to enable the redevelopment of Ravenscraig and
the realisation of associated economic benefits which will contribute to Strategic Performance
Framework Indicators C16  - Gross Added Value and C18 – Economic Activity. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3     SME Status and Location of All Tenderers 
Pamela Humphries
Head of Planning and Regeneration 
Page 128 of 181

Page 129

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
The report does not contain information that has an impact.   
With regard to the project, an Equality Impact Assessment has been carried out for the North
Lanarkshire City Deal Programme as well as for the project itself.  This will be reviewed and
updated as the project design is developed. 
5.2 Financial Impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
The Outline Business Case approved in 2020 by the council’s Enterprise and Growth
Committee and the Glasgow City Region City Deal Cabinet confirms the funding to be
provided to this project under the City Deal Programme.
The council’s financial contribution to the costs of the project has been provided for and
further approved in the capital programme. 
5.3 HR Policy Impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
5.4 Legal Impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
The Contract has been prepared in consultation with Legal and the award of Contract is in
accordance with the Council’s General Contract Standing Orders January 2020.   
5.5 Data Protection Impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☐ No ☒ 
5.6 Technology / Digital Impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?  
Page 129 of 181

Page 130

Yes ☐ No ☒ 
5.7 Environmental / Carbon Impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
The professional services to be commissioned do not have any direct impact on the 
environment or carbon matters but the construction and use of the infrastructure to be 
delivered will. 
The environmental impact of the proposed infrastructure has been assessed at the planning
application stage and it will be further assessed as the scheme detailed is developed through
to construction.  The environmental impact of the works on site will be managed and mitigated
through the constructor’s Construction Environmental Management Plan.   
5.8 Communications Impact  
Does the report contain any information that has an impact on the council’s communications
activities? 
Yes ☐ No ☒ 
The City Deal Programme and the projects within it are well publicised on an ongoing basis
through web updates and regular press releases issued by Corporate Communications. 
5.9 Risk Impact 
Is there a risk impact?  
Yes ☐ No ☒ 
There is no specific risk impact from this Contract. 
Project risks and their mitigation are managed through the council’s City Deal programme
risk register and project specific risk register. The registers are managed and reviewed by
the council’s City Deal Board, Ravenscraig Project Board and project team. 
Page 130 of 181

Page 131

Appendix 1 – Summary of Tender Evaluation Process 
Price Weighting 30% Quality Weighting 70% 
Tenderer Name
Weighted
Price
Score
Weighted
Qualitative
Score pre-
presentation
Tender
Score pre-
presentation
*
Total
Tender
Score
Final
Rank
Amey OW Limited 27.70% 54.00% 81.70% 85.20% 1
AECOM Limited 30.00% 50.50% 80.50% 85.00% 2
Sweco UK Limited 24.82% 52.00% 76.82% 79.82% 3
Atkins Limited ** N/A 45.75% N/A N/A N/A
Stantec UK Limited ** N/A 42.50% N/A N/A N/A 
Note: 
* Only those tenderers achieving a combined technical and commercial score within 5% of the
highest placed bidder prior to assessment of the Presentations were invited to give a
presentation to the council and its project team. 
**  Tenderers with a N/A ranking failed to meet the minimum requirements and / or pass mark of 70
applied to specific quality questions in the technical assessment and as such were excluded
from further participation in the procurement in accordance with the tender instruction and
evaluation guidance issued with the invitation to tender. 
Page 131 of 181

Page 132

Appendix 2 – Summary of Procurement Process 
Response
Procurement Procedure Utilised: Call-off contract from third party
framework agreement
Governing Legislation / Regulations: Public Contract (Scotland) Regulations
2015
Date Contract Strategy Approved: 07 March 2022
Number of Candidates Invited to Tender: 14
Tender Return Deadline: 3rd May 2022
Number of Tenders Received: 5
Tenders Received from SME’s: 0
Tenders Received from NLC Based Tenderers:  0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 5
Number of Recommended Tenderers: 1
Basis of Contract Award: Quality: 70 Price: 30
Evaluation Team: Staff from Enterprise Projects Team
Anticipated Contract Start Date: 28 June 2022
Total Contract Period (Months): 72
Maximum Total Contract Value: £1,992,812 
Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
AECOM Limited Large Glasgow
Amey OW Limited Large North Lanarkshire
Atkins Limited Large Edinburgh
Stantec UK Limited Large Glasgow
Sweco UK Limited Large Glasgow 
Page 132 of 181

Page 133

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: PH/RavLUF Date: 29 August 2022 
Contract Award for Ravenscraig Levelling Up Fund – Professional
Services for Project Team 
From  Pamela Humphries, Head of Planning and Regeneration  
E-mail speedj@northlan.gov.uk  Telephone Jonathan Speed
07583 669625 
Executive Summary 
Committee is asked to note the award of contracts for Ravenscraig Levelling Up Fund – Design &
Planning Services (the ‘D&P Contract’) to Sweco UK Limited and for Ravenscraig Levelling Up Fund
– Project & Contract Management Services (the ‘PCM Contract’) to Currie and Brown UK Limited. 
The award of the D&P Contract and the PCM Contract (together the ‘Contracts’) has been approved
by the Deputy Chief Executive, in accordance with the Council’s General Contract Standing Orders
(June 2022), to expedite the contract awards and commencement of services, in order to achieve
the programme requirements of the UK Government Levelling Up Fund, in the absence of a
Committee meeting. 
The D&P Contract is for an initial period of 23 months anticipated to commence on 18th July 2022.
The Council reserves the right to extend the D&P Contract for additional periods up to a maximum
of a further 12 months. 
The value of the D&P Contract shall not exceed five hundred and twenty three thousand, nine
hundred and seventy six pounds and thirty one pence, sterling (£523,976.31) exclusive of VAT. 
The PCM Contract is for an initial period of 4 years, 9 months anticipated to commence on 18th July
2022. The Council reserves the right to extend the PCM Contract for additional periods up to a
maximum of a further 12 months. 
The value of the PCM Contract shall not exceed three hundred and twenty thousand, one hundred
and thirty pounds and seventy six pence Sterling (£320,130.76) exclusive of VAT. 
Recommendations 
It is recommended that Committee notes the action taken to award:
1. The D&P Contract to Sweco UK Limited at the maximum value of five hundred and twenty three
thousand, nine hundred and seventy six pounds and thirty one pence, sterling (£523,976.31)
exclusive of VAT
AGENDA ITEM 13
Page 133 of 181

Page 134

2. The PCM Contract to Currie and Brown UK Limited at the maximum value of three hundred and
twenty thousand, one hundred and thirty pounds and seventy six pence Sterling (£320,130.76)
exclusive of VAT. 
This recommendation follows:
1. Approval by the Chief Executive in April 2022, between committee cycles in accordance with the
Council’s General Contract Standing Orders, 15th Edition (January 2020) of the commencement
of procurement and inviting of tenders.
2. The completion of a procurement procedure, where the tenders recommended for award have
been evaluated as providing the most economically advantageous tender in terms of cost and
quality for the Council.
3. Instruction by the Deputy Chief Executive to the Head of Assets and Procurement Solutions to
accept the Tenders. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (21) Continue to identify and access opportunities to leverage additional
resources to support our ambitions 
1 Background 
1.1  The requirements of the D&P Contract and PCM Contract have never been contracted before
by the Council therefore historical contract information is not available. 
1.2 In November 2021, Enterprise & Growth Committee noted the scoping of applications to the
UK Government’s Levelling Up Fund (the ‘LUF’) and approved their submission, including for
enabling works at Ravenscraig, to support this wider regeneration initiative. 
1.3 Subsequent to this, during late 2021 and early 2022, feasibility studies were undertaken to
develop the scope of an application for Ravenscraig and in March 2022, Policy and Strategy
Committee approved the proposed scope of the application. 
1.4 An application will be made to the LUF in August 2022 to support remedial and enabling
groundworks and the creation of a development platform for mixed use town centre plots
which would advance and promote development at Ravenscraig, building on the
development of the Sports Facility, the Park, the new Employment Access Road and related
plots, forthcoming active travel connections and the City Deal infrastructure. 
1.5 The application to the LUF will be specifically to support the cost of:
• Remedial and enabling groundworks and preparation of clean platform 
• Provision of new network utilities and service infrastructure including electricity, water,
drainage, and including an energy network and centre
• Providing new pedestrian, cycling and road access from Robberhall Road  
1.6 The prospectus for the second round of the LUF was published on 23 March 2022. The
prospectus confirmed the Council’s earlier expectations of timing for spend of any monies
awarded, i.e., that projects should demonstrate spend from the LUF in 2022-23 financial year
and that all funding provided from the LUF is expected to be spent by 31 March 2025 and by
2025-26 on an exceptional basis. 
Page 134 of 181

Page 135

1.7 It is currently assumed that announcements on the outcome of applications will be made in
the autumn budget, expected be in late October 2022. 
1.8 A programme for the development of detailed proposals and their implementation has been
prepared which demonstrates that these timescales, whilst challenging, can be met. This
programme includes all necessary Committee and other statutory approvals, including
planning, education, procurement. 
1.9 As noted in the report to Policy & Strategy Committee in March 2022, the requirement to
spend by the end 2024/25 requires some preparatory work to be undertaken in advance of
the outcome of the funding application being known and that this would include development
of detailed proposals for planning and procurement including the submission of a Proposal
of Application Notice and commencement of associated public consultation for the planning
application for the works to be supported by the LUF funded works. 
1.10 This preparatory work to develop the detailed proposals for planning, including public
consultation, for the LUF funded works is required to commence in summer 2022.
Accordingly the Council required to commence the procurement of the professional team
during May 2022. The commencement of procurement and inviting of tenders was approved
by the Chief Executive on 28th April 2022, between committee cycles in accordance with the
Council’s General Contract Standing Orders, 15th Edition (January 2020). 
2 Report 
2.1  A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions and
trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the D&P
Contract and PCM Contract. 
2.2 The initial estimated value of the contracts dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a “Mini Competition” from the Scotland Excel 
framework agreement for Engineering and Technical Consultancy Services. 
2.4 The Contract award recommendations are made on the basis of the tenderers who submitted
the most economically advantageous tenders. 
2.5 The tenders submitted by Sweco UK Limited and Currie and Brown UK Limited have been
evaluated as representing the most economically advantageous tender for the D&P Contract
and PCM Contract respectively. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
2.7 The value of the D&P Contract is five hundred and twenty three thousand, nine hundred and
seventy six pounds and thirty one pence, sterling (£523,976.31) exclusive of VAT including
any option to extend the Contract. 
Page 135 of 181

Page 136

2.8 The value of the PCM Contract is three hundred and twenty thousand, one hundred and thirty
pounds and seventy six pence Sterling (£320,130.76) exclusive of VAT including any option
to extend the Contract. 
2.9 The costs associated with contract delivery will be contained within the capital budget for
Ravenscraig Levelling Up Fund project. 
2.10 As noted at 1.9 above, the Council is required to proceed to commence the development of
detailed proposals for planning and procurement in advance of the outcome of the LUF
application being known, however the contracts for services are staged accordingly to reflect
the period prior to the funding outcome and the period following the outcome. Whilst the work
of the project team in the first stage is not expected to be undertaken at the Consultants’ risk,
their continued appointment beyond the funding announcement will be subject to a
successful LUF award. 
2.11 The value of the first stage of services, with a value of £390,000, is met through resources
earmarked by the service for this purpose. Expenditure for later stages is supported through
the LUF should the LUF application be successful. 
Price Savings / Increases 
2.12 There are no cashable savings attributed to the Contract. 
Price Stability 
2.13 The pricing mechanism is a Priced Contract with Activity Schedule offering a good level of
cost certainty. 
Community Benefits 
2.13.1 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.13.2 Within their tenders, Sweco UK Limited and Currie and Brown UK Limited committed to
deliver the following community benefits within the Contracts:  
Community Benefit Type
Quantity Committed 
Sweco Currie and
Brown
Work Experience Placement – school (includes virtual
options) 2 3
Work Experience Placement – non -school (includes
virtual options) 1 3
Non-financial consultancy support for a local community
project   1 1 
Page 136 of 181

Page 137

Fair Work First  
2.14 All contractors appointed to the Scotland Excel Engineering and Technical Consultancy
Framework have evidenced Fair Work practices and demonstrated how they will promote
them in the delivery of contract call-offs from the Framework. 
Contract Strategy 
2.15 Officers from Enterprise Projects will be responsible for managing the Contract which will be
undertaken in accordance with the Councils agreed approach to contract and supplier
management. 
3  Measures of success 
3.1 Successful appointment of a professional team will support the development of detailed
proposals for and their implementation for the Ravenscraig LUF project. A successful
Ravenscraig LUF application will support development of both Council and community assets
and the development and regeneration of Ravenscraig. 
4 Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Pamela Humphries 
Head of Planning and Regeneration 
Page 137 of 181

Page 138

5 Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
A Fairer Scotland Duty Assessment will be completed alongside the development of the
LUF application. 
5.2 Financial Impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with Financial
Solutions? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The cost of developing the application to date is supported by monies provided by the UK
Government and Ravenscraig Ltd. The expenditure required to develop and prepare
detailed proposals in advance of the outcome of the LUF application being known will be
funded from within existing budgets.
5.3 HR Policy Impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
5.4  Legal Impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal and
Democratic Solutions? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data Protection Impact 
Does the report / project / practice contain or involve the processing of personal data?   
Page 138 of 181

Page 139

Yes ☐ No ☒ 
5.6 Technology / Digital Impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?  
Yes ☐ No ☒ 
5.7  Environmental / Carbon Impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The original masterplan and permission for the development of Ravenscraig was supported
by an extensive Environmental Impact Assessment, and a number of technical assessments
were updated in the preparation of the Revised Masterplan in 2017. Further detailed
assessments will form a part of the planning applications for the LUF funded works and for
subsequent development of the proposed end uses 
5.8  Communications Impact  
Does the report contain any information that has an impact on the council’s communications
activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As noted at 1.9 the requirement to spend by the end 2024/25 requires some preparatory work
to be undertaken in advance of the outcome of the funding application being known and that
this would include development of detailed proposals for planning and procurement including
the submission of a Proposal of Application Notice and commencement of associated public
consultation for the planning application for the works to be supported by the LUF funded
works. 
5.9 5.9 Risk Impact 
Is there a risk impact?  
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
The primary risks at this time relate to:
Page 139 of 181

Page 140

• The need to incur some potentially abortive costs in order to progress preparations
for the works in advance of knowing the outcome of the bid, due to the tight
timescales for spending the funding.
• The uncertainty of securing funding which means the statutory education
consultation regarding the change of site will only take place if the bid is successful
• The potential risk that funding will not be fully spent by 31st March 2025 as delivery
timescales are tight, taking into account statutory processes
Page 140 of 181

Page 141

Appendix 1 – Summary of Tender Evaluation Process 
Price Weighting 40% Quality Weighting 60% 
Design & Planning Services (the ‘D&P Contract’) 
Contract Ref: NLC-SLP-22-007
Final
Rank Tenderer Name Quality
score (%)
Price
score (%)
Total
Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Sweco UK Limited 49.50% 36.76% 86.26% Y
2 Gavin & Doherty Geosolutions (UK) Ltd 44.25% 40.00% 84.25% N 
Project & Contract Management Services (the ‘PCM Contract’)
Contract Ref: NLC-SLP-22-006 
Final
Rank Tenderer Name Quality
score (%)
Price
score (%)
Total
Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Currie and Brown UK Limited  57.50% 40.00% 97.50 Y
2 Turner & Townsend plc 56.50% 33.89% 90.39 N
N/A Atkins* 33.00% N/A N/A N 
*  Tenderers with a N/A ranking failed to meet the minimum requirements and / or pass mark of 70
applied to specific quality questions in the technical assessment and as such were excluded
from further participation in the procurement in accordance with the tender instruction and
evaluation guidance issued with the invitation to tender.
Page 141 of 181

Page 142

Appendix 2 – Summary of Procurement Process 
Response
Procurement Procedure Utilised: Call-off contract from third party
framework agreement
Governing Legislation / Regulations: Public Contract (Scotland) Regulations
2015
Date Contract Strategy Approved: 16 May 2022
Number of Candidates Invited to Tender: D&P Consultant – 14
PCM Consultant – 12
Tender Return Deadline: 24 June 2022
Number of Tenders Received: D&P Consultant – 2
PCM Consultant - 3
Tenders Received from SME’s: 0
Tenders Received from NLC Based Tenderers:  0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: D&P Consultant – 2
PCM Consultant - 3
Number of Recommended Tenderers: D&P Consultant – 1
PCM Consultant – 1
Basis of Contract Award: Quality: 60% Price: 40%
Evaluation Team: Staff from Enterprise Projects Team
Anticipated Contract Start Date: 18 July 2022
Total Contract Period (Months): D&P Consultant – 23 months
PCM Consultant – 51 months
Maximum Total Contract Value: D&P Consultant – £523,976.31 excl VAT
PCM Consultant – £320,130.76 excl VAT 
Page 142 of 181

Page 143

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Sweco UK Limited Large Edinburgh
Gavin & Doherty Geosolutions (UK) Ltd Large  Edinburgh
Currie and Brown UK Limited  Large Glasgow
Turner & Townsend plc Large Glasgow
Atkins Large Edinburgh 
Page 143 of 181

Page 144

Page 144 of 181

Page 145

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref Netcall/Assistive  Date 29/08/22 
Contracts Awards – Business and Digital 
From  Head of Business and Digital 
E-mail hassellk@northlan.gov.uk Telephone 07903096121 
Executive Summary
In compliance with clause 21 of the General Contract Standing Orders (GCSO), this report
recognises two independent contract awards in respect of (a) Assistive Technologies and (b)
the maintenance and support of the Council’s Netcall telephony services. 
The contract for Assistive Technologies was awarded using a Negotiated Tendering
Procedure (NTP) outlined within section 9 of the GCSO (the ‘Contract’) to The Access
Technology Company Ltd through the Chief Executive, under his delegated authority in
compliance with GCSO 21.3.2. Contract details are provided within paragraph 1.2 below. The
contract is for a period of nine months, and the value of the Contract shall not exceed one
hundred and thirty-five thousand pounds (£135,000.00) Pounds Sterling exclusive of VAT. 
A contract for Annual Maintenance and Support (the ‘Contract’) was awarded to Netcall Ltd
by the Head of Business and Digital Solutions invoking the Negotiated Tendering Procedure
(NTP) outlined with section 9 of the GCSO. The Contract is for a period of 12 months with the
option to extend for another period of 12 months, and the value of the Contract shall not
exceed one hundred and fifty-seven thousand, six hundred- and four-Pounds Sterling
(£157,604.00) exclusive of VAT.
Recommendations 
It is recommended that Committee recognise the content of the report and the undernoted
contract awards.
(a) award of the Assistive Technologies Contract to The Access Technology Company
Ltd at the maximum value of one hundred and thirty-five thousand Pounds Sterling
(£135,000) exclusive of VAT. 
(b) award of the Netcall Annual Maintenance and Support contract to Netcall Ltd at the
maximum value of one hundred and fifty-seven thousand, six hundred- and four-
Pounds Sterling (£157,604.00) exclusive of VAT. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
AGENDA ITEM 14
Page 145 of 181

Page 146

1. Background 
1.1 In line with the Council’s Data Custodian Model, which has been the subject of previous
reports to the former Transformation and Digitisation Committee, several contracts
awarded through Business & Digital support digital services and infrastructure across all
council services.  Two such contract awards are detailed below. 
1.2 Assistive Technology 
1.2.1 This contract is required to complete the migration to M365 in line with the council’s digital
programme. This will allow all assistive technology users to utilise the new M365 office
suite and to fully collaborate with colleagues. 
1.2.2 Access Technology Company (ATC) have a long-standing partnership with North
Lanarkshire Council, supporting employees with existing and acquired health issues and
disabilities. 
1.2.3 It has been identified that there is an ongoing need for continued support. This will be
dealt with under a separate contract, currently in the draft stage and will be submitted to
a future committee for consideration. 
1.2.4 The contract will prepare a robust plan for the device deployment minimising disruption
to assistive technology users. 
1.3 Annual Maintenance and Support Contract for Netcall Telephony 
1.3.1 Netcall Ltd currently provide the Council’s corporate automatic call distribution (ACD)
telephony system, with such business-critical council-wide for managing customer
demand. Current functionality available through the Netcall Ltd solution includes
customer contact through telephone calls, e-mail and web chat, and an ability to maintain
service delivery via home working. 
1.3.2  The system allows incoming calls to be routed across the organisation to ensure that
services meet customer demand and manage critical delivery through skills-based
routing, menus, and messaging to update customers and direct calls to the appropriate
teams.
1.3.3 Netcall Ltd are the sole providers of the Council’s telephony hardware, software, and
maintenance. 
2. Report 
2.1  Assistive Technology
2.1.1 Through the delegated authority provided within GCSO 21.3.2, the Chief Executive
instructed the Head of Asset and Procurement Solutions to award the contract for
Assistive Technologies (the ‘Contract’). These subsequent paragraphs provide committee
with details of the contract award.
2.1.2 This contract supports users across the council with varied additional needs. It fully
supports the migration to M365 allowing users to fully integrate and collaborate with
colleagues. Furthermore, the contract will provide a full detailed inventory of NLC’s
assistive technology users and all associated software and hardware. The users will be
Page 146 of 181

Page 147

fully supported through the migration process minimising any disruption to the user and
the organisation. 
2.1.3 As detailed in paragraph 1.2 above The Access Technology Company Ltd (ATC) have a
longstanding partnership with North Lanarkshire Council. ATC are pioneers in this field
with a people first ethos. Due to the lack of competition in this field the contract has been
awarded under GCSO 5.2 where competition is absent for technical reasons and for
continuity of service provision until such times as the ongoing requirement for this service
is reviewed by the technology user group. 
2.2 Netcall - Annual Maintenance and Support Contract 
2.2.1 As detailed in paragraph 1.3.3 above Netcall Ltd are the sole providers of the Council’s
telephony hardware, software, and maintenance and therefore, the only company which
can presently deliver and meet the ongoing requirements of the Council, pending the
planned wider review of the Council’s telephony strategy.
2.2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Procurement (Scotland) Regulations 2016. The Head
of Asset and Procurement reported to Transformation and Digitisation Committee on 22
February 2022 that the procuring service had invoked clause 9.3 of the GCSO and used
the negotiated tendering procedure to award this contract to Netcall Ltd, without
advertising the competition. The circumstances in which the Council may award a contract
without competition are prescribed in the Procurement (Scotland) Regulations 2016 (the
“Regulations”), Regulation 6.
2.2.3 Having followed the GCSO and discussed the requirement approved through the
Enterprise Architecture Governance Group (EAGG) with the Heads of Asset and
Procurement Solutions and Legal and Democratic Solutions, the Head of Business and
Digital determined the Negotiated Tendering Procedure (NTP) was appropriate to use in
this instance. Pending the outcome of the planned council-wide review of the Council’s
future telephony requirements, it is not currently feasible to replace the existing hardware
and software products used to manage customer demand, therefore a final 12-month
maintenance contract with the option to award another 12 months period was awarded to
the current provider Netcall Ltd to ensure continuity of critical service delivery. 
3. Measures of success 
(a) Supporting the works of the Digital Community, Digital Economy and Digital Council 
4. Supporting documentation 
N/A 
Katrina Hassell
Head of Business and Digital 
Page 147 of 181

Page 148

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The value of the individual contracts:  £135,000 Pounds Sterling, £157,604 Pounds
Sterling can be met from within existing revenue budget resources respectively. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 148 of 181

Page 149

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☒ No ☒
If Yes, please provide a brief summary of the impact? 
The services outlined will ensure the digital ambitions of the council continue to be
met. 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Page 149 of 181

Page 150

Page 150 of 181

Page 151

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref HO PM 21 046 Date 29/08/22 
MTC – Fire Alarms, Smoke Alarms & Protection Systems –
Services and Maintenance – Negotiated Tender Procedure 
From  Brian Lafferty, Head of Business (Housing Property and Projects) 
E-mail starbucks@northlan.gov.uk Telephone Siobhan Starbuck -Contract   
Support Manager via MS Teams 
1. Background 
1.1 The repairs and maintenance of fire alarm systems, sprinklers, smoke vents were
originally intended to be included in a wider procurement exercise, however due to
limited interest in the market this route was unsuitable resulting in an NTP being
required to provide the critical service of these life safety systems. 
1.2 Spie Scotshield Limited were carrying out the existing contract, and therefore are the
incumbent Contractor. 
Executive Summary 
Committee is asked to acknowledge the actions of the Head of Housing Property and
Projects to award a Negotiated Tender to Spie Scotshield Limited to provide a repairs and
maintenance service for fire alarm systems, sprinklers and smoke vents.   
The Contract commenced on 12th March 2022 until 30th November 2022 inclusive. 
The value of the Contract is up to a maximum of One Hundred and Seventy Five Thousand
Pounds (£175,000.00) exclusive of VAT.
Recommendations 
It is recommended that Committee acknowledges the actions of the  Head of Housing
Property and Projects to award a Negotiated Tender to Spie Scotshield Limited.
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
AGENDA ITEM 15
Page 151 of 181

Page 152

1.3  The requirement has now been reprocured utilising a competitive procurement 
procedure which is due to commence later in the year. 
2. Report 
2.1 The decision to award a Contract to Spie Scotshield Limited was based on the
circumstance surrounding a wider procurement exercise including CCTV works. 
This function is critical to ensure life safety systems are maintained and operational and
could not wait to be undertake as a competitive procurement procedure. 
2.2 The value of the Contract is approximately £175,000.00 
Price Savings / Increases 
2.3 The pricing is fixed for the duration of the contract. 
Contract Strategy 
2.4 Officers from Housing Property and Projects will be responsible for managing the
Contract which will be undertaken in accordance with the Council’s agreed approach
to contract and supplier management. 
3. Measures of success 
It is anticipated that the award of the Contract will deliver the following successful
outcomes: 
3.1 the works continue to ensure life safety systems are maintained and operational 
3.2 the appointment of a Service Provider who has the experience and capability to deliver
an innovative, high quality and responsive service; 
3.3 the procurement procedure is compliant with procurement legislation and internal
procedures; 
3.4 that Best Value is both demonstrable and achieved; and 
4. Supporting documentation 
N/A 
Brian Lafferty 
Head of Business (Housing Property and Projects) 
5. Impacts ( http://connect/report-template-guidance )
Page 152 of 181

Page 153

5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
This Contract will work towards improving outcomes for people and communities by 
assisting the Council to reduce inequalities of outcomes caused by socio-economic 
disadvantage. 
The Council will continue to carry out equality impact assessments to determine if 
policies, practices, decisions, functions and strategies identify any negative impact
on 
any particular group covered by the protected characteristics of the Equality Act
2010. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
The cost associated with contract delivery will be contained within CRA budget. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
N/A 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
As this is a Negotiated Tender Procedure engagement with colleagues in with Legal
and Democratic Solutions was sought to provide advice around the risks of
proceeding to award without undertaking a competitive procurement procedure.
Page 153 of 181

Page 154

Risks include the possibility of a challenge to the award decision, however, due to
the health and safety aspect of this contract the decision was taken to proceed with
the contract award. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
N/A 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
N/A 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
N/A 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Risks associated with legal proceedings exist if the award decision is formally
challenged, however, risk surrounding health and safety concerns existed if the
contract was not awarded.
Page 154 of 181

Page 155

The service risk register has a specific risk in relation to managing building
compliance. This risk has adequate controls in place and is monitored and updated
on a monthly basis. 
Page 155 of 181

Page 156

Page 156 of 181

Page 157

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  NLC-CPT-21-057(HO PM 21 046)  Date 29/08/22 
Contract Award for MTC for Fire Alarm, Smoke Alarm and
Protection Systems Service and Maintenance in Non-Domestic
Properties 2022-2026 
From  Brian Lafferty - Head of Business (Housing Property and Projects)  
E-mail starbucks@northlan.gov.uk Telephone
Siobhan Starbuck -
Contract Support Manager
via MS Teams 
Executive Summary
Committee is asked to approve the award of a contract for “MTC for Fire Alarm, Smoke
Alarm and Protection Systems Service and Maintenance in Non-Domestic Properties
2022-2026” (the ‘Contract’) to SPIE Scotshield Limited. 
The Contract is for an initial period from 1st December 2022 until 21st January 2024. The
Council reserves the right to extend the Contract for additional periods up to a maximum
of a further 24 months 
The value of the Contract shall not exceed Eight Hundred Thousand Pounds (£800,000.00)
exclusive of VAT. 
Recommendations 
It is recommended that Committee approves the award of the Contract to SPIE Scotshield
Limited up to a maximum of Eight Hundred Thousand Pounds (£800,000.00) exclusive of
VAT. 
This recommendation follows the completion of a procurement procedure, where the
tender recommended for award has been evaluated as providing the most economically
advantageous Tender in terms of cost and quality for the Council.
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (14) Ensure the highest standards of public protection
AGENDA ITEM 16
Page 157 of 181

Page 158

1. Background 
1.1 The incumbent contractor for the services to be provided under this contract is SPIE
Scotshield Limited. This contract is due to expire on 30th November 2022. 
1.2  This procurement is an above GPA threshold Regulated Procurement and has been
discharged using a single stage procurement process. 
1.3  This procurement was carried out as a single lot. 
1.4  This is the renewal of an existing contract which was awarded on 11 March 2022
following the conclusion of a negotiated tender procedure. 
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions
and trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the
Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. The
contract opportunity was published on the Public Contracts Scotland and the UK Find
a Tender (FTS) website with a “Open” procurement procedure adopted. 
2.3 Based on the evaluation criteria and scoring methodology set out in the invitation to
tender package within the procurement procedure, an evaluation of tender responses
was completed by members identified by the UIG. Award stage responses were
evaluated first, then the most economically advantageous tender was taken forward to
selection stage to ensure the tender satisfied the minimum selection stage criteria
applied. 
2.4 The Contract award recommendation is made on the basis of the bidder who submitted
the most economically advantageous tender. 
2.5 The tender submitted by SPIE Scotshield Limited has been evaluated as representing
the most economically advantageous tender for this Contract. 
2.6 Appendix 1 confirms the scoring achieved by each bidder, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of
all bidders is located within Appendix 3. 
2.7 The value of the Contract is a maximum of Eight Hundred Thousand Pounds 
(£800,000.00) exclusive of VAT.
2.8 The costs associated with contract delivery will be contained within the HRA Revenue
budget set for each financial year of the Contract period. 
Page 158 of 181

Page 159

Price Savings / Increases 
2.9 Contract pricing is fixed until March 2023. Thereafter, prices will be adjusted annually
by the application of the RICS Mechanical and Engineering Cost Index. 
Price Stability 
2.10 Schedule of Rates with prices for adjustment by overall percentage and annual BCIS
fluctuation percentage. 
Community Benefits 
2.11.1 The Council is committed to maximising the delivery of community benefits. The
procurement included a community benefit requirement, this approach is designed to
deliver local community benefits where possible. 
2.11.2 Within their tender SPIE Scotshield Limited committed to deliver the following
community benefits within the Contract:  
Community Benefit Type Quantity
Committed
Modern Apprenticeships 2
Work Experience Placement (16+ Year Olds) 1
Educational Visits 2
Supply Chain Event 2
Business Advice / Support 1
Financial Support for the Community  1
Non-Financial Support for the Community  2 
2.11.3 The community benefits delivered as part of the Contract includes the creation of jobs
or apprenticeships. 
Fair Work First  
2.12 Within their tender submission, SPIE Scotshield Limited advised that they would
commit to the following areas of the Scottish Governments “Fair Work First” initiative: 
• Commitment to pay at least Living Wage 
• No zero hours contracts
• Flexible working and supportive of a wider work life balance
• Promote diversity, equality and fair employment practices
• Support for learning and development, are supportive of further education
opportunities for employees
• Gender balance and wider representative workforce 
Page 159 of 181

Page 160

Contract Strategy 
2.13 Officers from Housing Property and Projects will be responsible for managing the
Contract which will be undertaken in accordance with the Council’s agreed approach
to contract and supplier management. 
3. Measures of success 
It is anticipated that the award of the Contract will deliver the following successful
outcomes: 
3.1 the appointment of a Service Provider who has the experience and capability to deliver
an innovative, high quality and responsive service; 
3.2 the procurement procedure is compliant with procurement legislation and internal
procedures; 
3.3 that Best Value is both demonstrable and achieved; and 
3.4 that the contract secures a range of community benefits. 
4. Supporting documentation 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME status and location of all Bidders 
Brian Lafferty 
Head of Business (Housing Property and Projects) 
Page 160 of 181

Page 161

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
This Contract will work towards improving outcomes for people and communities by
assisting the Council to reduce inequalities of outcomes caused by socio-economic
disadvantage. 
The Council will continue to carry out equality impact assessments to determine if
policies, practices, decisions, functions and strategies identify any negative impact on
any particular group covered by the protected characteristics of the Equality Act 2010. 
If Yes, has an assessment been carried out and published on the council’s website? 
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☒ 
5.2 Financial Impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions? 
Yes ☒ No  ☐ 
If Yes, please provide a brief summary of the impact?
The costs associated with contract delivery will be contained within the HRA Capital
budget. 
5.3 HR Policy Impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People and
Organisational Development? 
Yes ☐ No ☐ 
Page 161 of 181

Page 162

If Yes, please provide a brief summary of the impact? 
N/A 
5.4 Legal Impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal and
Democratic Solutions? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
N/A 
5.5 Data Protection Impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐ 
5.6 Technology / Digital Impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?  
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
N/A 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐ 
Page 162 of 181

Page 163

5.7 Environmental / Carbon Impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Contract conditions encourage a sustainable and safe working environment;
promote health and wellbeing, safe removal and disposal of materials 
The proposed contractor is BS EN ISO 14001 (or equivalent) and BS EN ISO 9001 (or
equivalent) accredited and has provided appropriate evidence of accreditation. 
5.8 Communications Impact  
Does the report contain any information that has an impact on the Council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
N/A 
5.9 Risk Impact 
Is there a risk impact?  
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service or
Project Risk Registers), and how they are managed? 
5.9.1 Risk will be minimised and managed by a designated Contract Manager in accordance
with the specification and in line with the Council’s agreed approach to Contract and
Supplier Management.
5.9.2 Health and Safety Risk
The proposed contractor is UKAS (BS EN ISO 45001) Accredited and has provided
appropriate evidence of their accreditation. 
5.9.3 Contract Award ( COVID-19 Considerations)
The Contract will be awarded in accordance with the Council’s General Contract
Standing Orders and Legal and Procurement advice will be sought and adhered to as
required in relation to commencing the Contract whilst COVID-19 restrictions remain
in place and/ or are being reviewed. Risk of awarding the Contract whilst any COVID-
19 restrictions remain in place will be identified and mitigated where possible. 
Page 163 of 181

Page 164

5.9.4 Furthermore, the Council may develop a Contract Mobilisation Plan with the 
successful Bidder which shall take cognisance of any COVID-19 precautions in 
place, any changes to restrictions will be closely monitored. 
Page 164 of 181

Page 165

Appendix 1 – Summary of Tender Evaluation Process 
In the Award Stage, Bidders price scores were added to their quality scores to obtain their
final tender scores. Only the first ranking bidder from Award Stage underwent Selection Stage
evaluation. Details are contained in the tables below. 
Table 1: Stage 1 – Award Stage Evaluation Outcome 
Final
Rank Bidder Name
Total
Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 SPIE Scotshield Limited 93.93 Y
2 DM Integrated Limited 93.88 N
3 Secureshield Limited 66.54 N
4 DFP Services Limited 58.23 N
5 Churches Fire Safety Limited -55.60 N 
Table 2: Stage 2 – Selection Stage Evaluation Outcome 
Bidder Name
Part 3
A, B, C & D
Part 4
A & B
Part 4
C
Part 4
D Selection
Requirements
Met?
(Yes/No)
Selection
Criteria
Selection
Criteria
Selection
Criteria
Selection
Criteria
Pass/Fail Pass/Fail Score
(min = 50) Pass/Fail
SPIE
Scotshield
Limited
Pass Pass 88.93 Pass Yes 
Page 165 of 181

Page 166

Appendix 2 – Summary of Procurement Process
Contract Title Response
Procurement Procedure Utilised: Open Procedure
Governing Legislation / Regulations: The Procurement (Scotland) Regulations
2015
Date Contract Strategy Approved: 1 March 2022
Date Contract Notice Published: 1 March 2022
SME % of Expressions of Interest: 70.83%
NLC Based % of Expressions of Interest: 20.83%
Tender Return Deadline: 1 April 2022
Number of Tenders Received: 5
Tenders Received from SME’s: 4
Tenders Received from NLC Based Bidders:  2
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 5
Number of Recommended Bidders: 1
Basis of Contract Award: Quality: 40% Price:  60%
Evaluation Team: Staff from Housing Property and Projects
and external consultant
Anticipated Contract Start Date: 1 December 2022
Total Contract Period:
1 December 2022 to 21 January 2024
plus up to a maximum of 24 months
optional extension (in 3-month periods)
Maximum Total Contract Value: £800,000.00 
Page 166 of 181

Page 167

Appendix 3 – SME Status and location of all Bidders 
Name of Bidder
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
SPIE Scotshield Limited  Medium  South Lanarkshire
DM Integrated Limited  Small  North Lanarkshire
Secureshield Limited  Medium  North Lanarkshire
DFP Services Limited  Medium  Durham
Churches Fire Safety Limited  Large  Hampshire 
Page 167 of 181

Page 168

Page 168 of 181

Page 169

North Lanarkshire Council
Report
Enterprise, Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref Ventilation NTP Date 29/08/22 
Ventilation Works - Negotiated Tender Procedure 
From  Brian Lafferty, Head of Business (Housing Property and Projects) 
E-mail starbucks@northlan.gov.uk Telephone Siobhan Starbuck -Contract   
Support Manager via MS Teams 
Recommendations 
It is recommended that Committee acknowledges the actions of the Deputy Chief Executive
to award a Negotiated Tender to Mears LLP. 
1. Background 
1.1 Due to the COVID requirements relating to improving and providing well ventilated
areas in schools and in accordance with Scottish Government Guidance, as part of a
wider programme of works being implemented across the Education Estate, there is a
requirement to improve the ventilation across all schools.  This is being delivered in a
number of ways, in particular the repair, installation and upgrading of mechanical
ventilation and skylights, and in the repair, renewal and replacement of defective and
inoperable windows to ensure that there is appropriate ventilation in all educational
settings to reduce the likelihood of COVID transmission.  
1.2 The Scottish Government provided addition funding to assist with these essential
works.
Executive Summary 
Committee is asked to acknowledge the actions of the Deputy Chief Executive to award a
Negotiated Tender to Mears LLP for Ventilation Works to provide and improve ventilation
in schools to reduce the likelihood of Covid transmission. 
The Contract commenced in November 2021 for approximately 45 weeks. 
The Value of the Contract is approximately one Million Pounds (£1,000.000.00) exclusive
of VAT. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
AGENDA ITEM 17
Page 169 of 181

Page 170

1.3 This is a stand-alone exercise and therefore there is no incumbent contractor for  the
works. 
2. Report 
2.1 Due to the ongoing Health and Safety concerns surrounding Covid-19 the contract
award recommendation was made based on the urgency of the requirement.  
A negotiated Tender procedure was carried out with the current partnership contractor
(Mears LLP) to mobilise with immediate effect. 
2.2 The value of the Contract is approximately £1,000.000.00 
Price Savings / Increases 
2.3 The pricing is fixed for the duration of the contract. 
Contract Strategy 
2.4 Officers from Housing Property and Projects will be responsible for managing the
Contract which will be undertaken in accordance with the Council’s agreed approach
to contract and supplier management. 
3. Measures of success 
It is anticipated that the award of the Contract will deliver the following successful
outcomes: 
3.1 the works will improve the safety and wellbeing within schools 
3.2 the appointment of a Service Provider who has the experience and capability to deliver
an innovative, high quality and responsive service; 
3.3 the procurement procedure is compliant with procurement legislation and internal
procedures; 
3.4 that Best Value is both demonstrable and achieved; and 
4. Supporting documentation 
N/A 
Brian Lafferty 
Head of Business (Housing Property and Projects) 
Page 170 of 181

Page 171

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
This Contract will work towards improving outcomes for people and
communities by 
assisting the Council to reduce inequalities of outcomes caused by socio-
economic 
disadvantage. 
The Council will continue to carry out equality impact assessments to
determine if 
policies, practices, decisions, functions and strategies identify any negative
impact on 
any particular group covered by the protected characteristics of the Equality
Act 2010. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
The cost associated with contract delivery will be contained within Capital budget
with the assistance of additional funding from the Scottish Government. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
N/A 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☒ No ☐
Page 171 of 181

Page 172

If Yes, please provide a brief summary of the impact? 
As this is a Negotiated Tender Procedure engagement with colleagues in with Legal
and Democratic Solutions was sought to provide advice around the risks of
proceeding to award without undertaking a competitive procurement procedure.
Risks include the possibility of a challenge to the award decision, however, due to
the health and safety aspect of this contract the decision was taken to proceed with
the contract award. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
N/A 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
N/A 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
N/A 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
Page 172 of 181

Page 173

If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Risks associated with legal proceedings exist if the award decision is formally
challenged, however, risk surrounding health and safety concerns existed if the
contract was not awarded.
The service risk register has a specific risk in relation to managing building
compliance. This risk has adequate controls in place and is monitored and updated
on a monthly basis.   
Page 173 of 181

Page 174

Page 174 of 181

Page 175

North Lanarkshire Council
Report
Enterprise Growth and Fair Work Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref CG/JMcK Date 29/08/22 
Contracts awarded below Committee approval threshold 
From  Head of Asset and Procurement Solutions  
Email mckinstryj@northlan.gov.uk Telephone
James McKinstry
07939 281102 
1. Background 
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. Contract awards
above £500,000 for Supplies and Services and above £2,000,000 for Works require
approval by the Committee. These contract awards are considered by the Committee
on a case-by-case basis. 
1.2 Where the value of a contract award is between £50,000 and £500,000 for Supplies
and Services and between £500,000 and £2,000,000 for Works, GCSOs require that
the Head of Asset and Procurement Solutions award these contracts on behalf of the
appropriate Chief Officer. 
1.3 The Head of Asset and Procurement Solutions is required to notify Committee on a
regular basis of any such contracts awarded on behalf of Procuring Service Areas.
Executive Summary 
This report notifies the Committee of the contracts awarded between 1 January 2022 to 30
June 2022. It sets out those contracts awarded with a value below the financial threshold
requiring Committee approval. 
Recommendations
The Enterprise Growth and Fair Work Committee are: 
• advised of the Contracts awarded below Committee approval threshold between 1
January 2022 to 30 June 2022 as per the process within the Council’s General
Contract Standing Orders.   
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
AGENDA ITEM 18
Page 175 of 181

Page 176

2. Report 
2.1 The GCSOs require that contracts in excess of £500,000 for supplies and services and
£2,000,000 for works are approved, on a case-by-case basis, by the Committee before
award. 
2.2 The GCSOs require that contracts with a value above £50,000 but less than £500,000
for Supplies and Services and above £500,000 but less than £2,000,000 for Works are
awarded by the Head of Asset and Procurement Solutions on behalf of the appropriate
Chief Officer. 
2.3 The contracts awarded by the Head of Asset and Procurement Solutions that are under
the £500,000 Committee financial approval threshold for Supplies and Services and
£2,000,000 for Works in the period from 1 January 2022 to 30 June 2022 are detailed
in Appendix 1. 
3. Measures of success 
3.1 Contracts support the delivery of Council and service priorities. 
3.2 Appointment of contractors who have suitable experience and capability to deliver the
required supplies, services or works. 
3.3 Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
3.4 The Council’s Contract Register is kept updated by services and management
information is comprehensive and accurate. 
3.5 Best Value is both demonstrable and achieved.     
4. Supporting documentation 
4.1 Appendix 1 - Summary of contracts awarded. 
James McKinstry
Head of Asset & Procurement Solutions 
Page 176 of 181

Page 177

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Financial impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
The Council’s Procurement Strategy proposes methods of maximising the delivery of 
procurement benefits that could bring improved financial return to the Council and 
the areas wider economy. Certain benefits have a monetary value attached and
these will be monitored on a project-by-project basis.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where HR impacts have been identified, they have been established and addressed 
in each specific Contract Strategy and incorporated into the project.   
Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Legal impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
Page 177 of 181

Page 178

Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
All contracts listed have been assessed by the Enterprise Architecture Governance
Group (EAGG) 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Sustainable procurement is one of the key objectives of the Council’s Procurement
Strategy and will have a positive impact, including, embedding sustainable
procurement as business as usual and incorporating community benefits into the
Councils contracts. Supporting local businesses and SMEs through closer working
with colleagues in the Council’s Enterprise department and by making our processes
more streamlined and accessible. 
Where Environmental/Carbon impacts have been identified, they have been 
established and addressed in each specific Contract Strategy and incorporated into 
the project.  
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?
Page 178 of 181

Page 179

Where Risk impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project. 
Contract award procedures may be susceptible to legal challenge if they are not
discharged in accordance with GCSO and procurement legislation. 
Page 179 of 181

Page 180

APPENDIX 1 – SUMMARY OF BELOW THRESHOLD CONTRACT AWARDS
Contract Description Contract
Award
Date
Contract
Start   
Date
Contract
End Date
Contract
Extension
Contract Value
(inc extension)
(£s)
Pre-
Procurement
Estimate
(£’s)
Successful
Tenderer 
Supplies
Services
Works
No of
Tenders
Received 
Route*
Supply of Online Learning
Materials 28/03/2022 31/10/2022 31/10/2022 N/A £70,000.00 £70,000.00 Learning Pool Services  1 N*
Office Equipment MDF Managed
Print Service 14/04/2022 04/05/2022 03/05/2023 N/A £400,000.00 £400,000.00 Canon UK Limited Services 1 EXT**
Netcall Telephony System,
Annual Support & Maintenance
2022-24
16/06/2022 19/06/2022 18/06/2023 18/06/2024 £157,604.00 £157,604.00
Netcall
Technology
Limited
Services 1 N* 
*Contract awards via the use of the Negotiated Tendering Procedure to incumbent providers to ensure continuity of service provision to allow a
review and redesign of future requirements for these services.
**Contract extension to incumbent provider delivering best value.  Provision for extension made in original contract award reported to previous
Committee. 
Key – Procurement Route
CO -   Contract Open Procedure
CR -   Contract Restricted Procedure
FO -   Framework Open Procedure
FR -   Framework Restricted Procedure
FMCC - Mini Comp Council Framework
FMC3 - Mini Comp 3rd Party Framework
DAFC - Direct Award Council Framework
Page 180 of 181

Page 181

DAF3 -  Direct Award 3rd Party Framework
DAH&SC - Direct Award Health & Social Care Related Services
N -   Negotiated Contract
EXT -  Extension to Contract/Framework 
Page 181 of 181