Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
13 September 2023 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 20 SEPTEMBER 2023 at 10:30 AM, which you
are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 23 August
2023 at 11.00 am (Pages 5 - 10)  
(b) Planning, Protective Services and Licensing Committee held on 23 August
2023 at 2.00 pm (Pages 11 - 12)  
(c) Planning, Protective Services and Licensing Committee held on 23 August
2023 at 2.45 pm (Pages 13 - 16)  
(d) Planning, Protective Services and Licensing Committee held on 29 August
2023 (Pages 17 - 18) 
4. MR SHAUN SINCLAIR: ERECTION OF CAFÉ WITH ASSOCIATED
LANDSCAPING INCLUDING A VIEWPOINT, SEATING, INTERPRETIVE SIGN
AND PLAY PARK: LAND WEST OF INVERLUSRAGAN, CONNEL (REF:
21/01583/PP) (Pages 19 - 60)  
Report by Head of Development and Economic Growth 
5. MR D HIGGINS: ERECTION OF DWELLINGHOUSE, FORMATION OF
VEHICULAR ACCESS AND ASSOCIATED WORKS: GARDEN GROUND OF
TORWOOD HOUSE, TORWOODHILL ROAD, RHU, HELENSBURGH (REF:
22/02523/PP) (Pages 61 - 100)  
Report by Head of Development and Economic Growth
Public Document Pack

Page 2

6. YLEM ENERGY LTD: PROPOSAL OF APPLICATION NOTICE FOR
INSTALLATION OF 50MW BATTERY ENERGY STORAGE SYSTEM TO
BALANCE THE ELECTRICITY NETWORK AND FACILITATE RENEWABLE
ENERGY DEPLOYMENT: ARDENCAPLE FARM, RHU, HELENSBURGH (REF:
23/01276/PAN) (Pages 101 - 108)  
Report by Head of Development and Economic Growth 
7. LOCH LONG SALMON LIMITED: PROPOSAL OF APPLICATION NOTICE FOR
THE INSTALLATION AND OPERATION OF LURIGNISH FISH FARM AND
ASSOCIATED INFRASTRUCTURE: LURIGNISH FISH FARM, LAND ADJACENT
TO LURIGNISH FARM, APPIN (REF: 23/01581/PAN) (Pages 109 - 116)  
Report by Head of Development and Economic Growth 
8. PLANNING POLICY RESPONSE TO ARGYLL AND BUTE'S DECLARED
HOUSING EMERGENCY (Pages 117 - 126)  
Report by Executive Director with responsibility for Development and Economic
Growth 
9. OCCUPATIONAL HEALTH AND SAFETY LAW ENFORCEMENT PLAN 2023-2025
(Pages 127 - 140)  
Report by Executive Director with responsibility for Development and Economic
Growth 
10. ANIMAL HEALTH & WELFARE WORK PLAN 2023/25 (Pages 141 - 158)  
Report by Executive Director with responsibility for Development and Economic
Growth
* 11. REVIEW OF ARGYLL AND BUTE COUNCIL'S SHORT-TERM LET LICENSING
POLICY (Pages 159 - 202)  
Report by Executive Director with responsibility for Development and Economic
Growth 
12. IMPLICATIONS OF THE INTRODUCTION OF THE FIREWORKS AND
PYROTECHNIC ARTICLES (SCOTLAND) ACT 2022 WITH RESPECT TO
FIREWORK CONTROL ZONES (Pages 203 - 208)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
REPORT FOR NOTING 
13. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI FARE SCALE REVIEW
(Pages 209 - 212)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie

Page 3

Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 23 AUGUST 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Graham Hardie
Councillor Mark Irvine 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Peter Bain, Development Manager 
Sandra Davies, Major Applications Team Leader
Bryn Bowker, Area Team Leader – Mid Argyll, Kintyre and the Islands
Stephanie Wade, Senior Planning Officer
Sybil Johnson, Senior Planning and & Strategies Officer
Sheila MacFadyen, Senior Solicitor 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Daniel Hampsey
and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 21
June 2023 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 28
June 2023 at 2.00 pm was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 28
June 2023 at 2.30 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 28
June 2023 at 3.00 pm was approved as a correct record. 
4. PROTECTION OF CHILDREN AT WORK - EMPLOYMENT OF CHILDREN
BYELAWS 
Argyll and Bute Council made byelaws on 14 August 2002 in relation to the employment of
children at work.  These byelaws were confirmed by the Scottish Executive on 24 June
2003 and came into force on 29 August 2003.  In terms of Section 201 of the Local
Government (Scotland) Act 1973, byelaws require to be renewed not later than 10 years
from coming into force.  The byelaws were last reviewed in May 2013 and were before the
Committee for consideration.
Page 5 Agenda Item 3a

Page 6

Decision 
The Committee agreed that no change be made to the current byelaws at this time. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 9 August 2023, submitted) 
* 5. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: SHORT-TERM LETS
LICENSING POLICY HEARING PROCEDURE 
Consideration was given to a report proposing amendments to Argyll and Bute Council’s
current Short-term Lets Policy Hearing Procedure. 
Decision 
The Committee:- 
1. considered the content of this report; and 
2. agreed to recommend to Council approval of the proposed revisals to Argyll and Bute
Council’s Short-term Lets Policy Hearing Procedure as set out in Appendix 1 of the
report. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 4 August 2023, submitted) 
6. MR & MRS D KELLY: DEMOLITION OF EXISTING CONSERVATORY,
ERECTION OF REAR EXTENSION, ERECTION OF FRONT PORCH AND
ALTERATIONS TO PRINCIPAL ELEVATION: STRATHMORE, DRUMLEMBLE,
CAMPBELTOWN (REF: 23/01069/PP) 
The Area Team Leader spoke to the terms of the report.  This application was before the
Committee as the Applicant was an elected Member of the Council.  Planning permission
is sought for the erection of a front porch, the demolition of an existing rear conservatory
and the erection of a single storey rear extension.  It is also proposed to extend the lounge
area to the front of the detached property. 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission. 
It was recommended that planning permission be granted subject to one standard
condition and reason as detailed in the report of handling. 
Decision 
1. The Committee agreed to grant planning permission subject to the following condition
and reason: 
PP - Approved Details & Standard Notes – Non EIA Development 
Page 6

Page 7

The development shall be implemented in accordance with the details specified on the
application form dated 31.05.23; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Existing Location
Plan/elevations/floor
plan 
Kelly-21/100-01 REV A 01.06.23
Proposed site
plan/elevations/floor
plan
Kelly-21/100-02 REV A 01.06.23 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
(Reference: Report by Head of Development and Economic Growth dated 4 August 2023,
submitted) 
7. SAULMORE BAY RESORT LTD: PROPOSAL OF APPLICATION NOTICE FOR
MARINA; BOATYARD (INCLUDING ANCILLARY OFFICES (CLASS 4) AND
STORE (CLASS 6)); LEISURE RESORT (INCLUDING BUILDINGS FOR
LEISURE USE (CLASS 11), RETAIL (CLASS 1) AND RESTAURANT/CAFE
(CLASS 3)); HOLIDAY LODGES (SUI GENERIS); AND OTHER HOLIDAY
ACCOMMODATION TYPES (SUI GENERIS); NEW ROADS,
WALKWAYS/CYCLEWAYS; AND RELATED DRAINAGE AND OTHER
INFRASTRUCTURE: CAMUS BRUAICH, RUAIDHE, CONNEL  (REF:
23/01040/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The site of the proposed
development which is subject to the Proposal of Application Notice (PAN) is located within
open countryside adjacent to the western settlement boundary of Connel and to the north
of the A85, around Camus Bruaich Bay (Loch Etive). 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and submissions with no further feedback
being provided. 
(Reference: Report by Head of Development and Economic Growth dated 8 August 2023,
submitted) 
Page 7

Page 8

8. INTELLIGENT LAND INVESTMENTS: PROPOSAL OF APPLICATION NOTICE
FOR PROPOSED PUMPED STORAGE HYDRO SCHEME: LAND EAST OF
BALLIEMEANOCH, DALMALLY  (REF: 23/01212/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The development which is
subject to the Proposal of Application Notice (PAN) is of a scale which will be an
application to the Scottish Ministers under the Electricity Act 1989.  Therefore the
submission of this PAN is voluntary and no public events are required under the
provisions of the Act.  This may form the basis of subsequent application to Scottish
Ministers and Argyll and Bute Council will be a consultee on the application. 
The proposal comprises a Pumped Storage Hydro Electric Scheme close to Lochan Airigh
approximately 4.4 km to the south of the village of Portsonachan and 9 km north west of
Inveraray.  The site is located within the North Argyll Area of Panoramic Quality as defined
in the Local Development Plan and would be located around 13 km to the south of the
Loch Etive Mountains Wild Land Area and around 9 km to the west of Ben Lui Wild Land
area as identified by NatureScot. 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and submissions with no further feedback
being provided. 
(Reference: Report by Head of Development and Economic Growth dated 8 August 2023,
submitted) 
9. SCOTTISH GOVERNMENT CONSULTATION: EFFECTIVE COMMUNITY
ENGAGEMENT IN LOCAL DEVELOPMENT PLANNING GUIDANCE 
A report advising the Committee of the Scottish Government consultation on Effective
Community Engagement in Local Development Planning Guidance and seeking approval
for the proposed response to this consultation was before the Committee for
consideration. 
Decision 
The Committee agreed to:- 
1. note this report and the implications of the proposed guidance for the planning service
and the wider council; and 
2. approve the proposed response to the consultation to the Scottish Government set out
in Appendix 1 of the report.
Page 8

Page 9

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 23 August 2023, submitted) 
10. DEVELOPMENT MANAGEMENT PERFORMANCE UPDATE - FQ1 2023/24 
A report providing an update on the performance of the Development Management
Service for the reporting period FQ1 2023/24 was considered. 
The document attached at Appendix 1 of the report provides an overview of the current
demands upon the Development Management Service, its output during this period, the
handling of the current backlog of casework, and the average time taken to determine
planning applications. 
Decision 
The Committee considered and noted the content of the report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 9 August 2023, submitted) 
11. UPDATE ON RECENT SCOTTISH MINISTERS SECTION 36 WIND FARM
DECISION 
A report summarising the recent decision by Scottish Ministers to refuse section 36
consent and deemed planning permission for Sheirdrim Renewable Energy Development
was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 19 July 2023,
submitted) 
12. PLANNING PERFORMANCE FRAMEWORK 2022/23 
A report introducing the 2022/23 Planning Performance Report Framework (PFF) Annual
report as required by the Scottish Government Planning Reform Agenda was before the
Committee for information. 
Decision 
The Committee noted: 
1. the content of the Planning Performance Framework 2022/23; and 
2. that an update report would be submitted detailing Scottish Government feedback at
the appropriate time later in 2023/24. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 8 August 2023 and Planning Performance Framework 2022/23,
submitted)
Page 9

Page 10

This page is intentionally left blank

Page 11

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 23 AUGUST 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Graham Hardie 
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Fiona Macdonald, Solicitor
William Currie, Applicant 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Daniel Hampsey,
Paul Kennedy and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR GRANT OF
TAXI CAR LICENCE (CURRIE TAXIS, ALEXANDRIA) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of audio
call and Mr Currie joined the meeting by telephone. 
The Chair then outlined the procedure that would be followed and invited the Applicant to
speak in support of his application.   
APPLICANT  
Mr Currie advised that he has been driving taxis in the Helensburgh area for 4 years in
someone else’s car.  The contract is a 50:50 split with 50% of everything he earns going
to the owner of the car.  He said that the understood that the car owner had no plans to
replace him as a taxi driver so in theory the taxi fleet would be down one car before he
started out on his own. 
Mr Currie advised that he knew Helensburgh well and that he enjoyed working there and
got on well with his customers.  He said that he would like the security of having his own
taxi plate and car. 
MEMBERS’ QUESTIONS 
Councillor Green asked Mr Currie if he knew if the person that owned the car he currently
drove would be surrendering his taxi plate.  Mr Currie said he did not think so.  He
Page 11 Agenda Item 3b

Page 12

explained that the owner held his own taxi licence so could drive the car if he wanted to. 
He advised that the owner had other full time employment but may retire from that job and
work as a taxi driver at that point. 
Councillor Green sought and received confirmation from the Council’s Solicitor, Ms
Macdonald, that there were currently 46 taxi cars in the Helensburgh and Lomond area
compared to 48 when the LVSA survey was carried out. 
Mr Currie referred to demand for taxis at the weekend and commented that 46 taxis were
never out at the same time.  He advised that his customers complained that it was difficult
to get taxis at certain times.  He advised that having worked in Helensburgh for 4 years he
knew when the busy and quiet times were.  He said that he tended to work at night when
people found it difficult to get a taxi.  He said there were only so many taxis from the
Trident Office, where he currently worked, that came out at night. 
Councillor Hardie sought and received confirmation from Mr Currie that he believed there
was a lack of taxis in the town at certain times.  He said it tended to be quieter during the
week, during the day.   He advised that there tended to be more taxis available during the
day compared to at night as there were limited drivers working at night.  He said that it
was very difficult to get a taxi after 1 or 2 am as most taxis stopped at that time when the
licenced premises closed. 
SUMMING UP 
Applicant 
Mr Currie said it was his intention that this would be full time employment for him and that
he planned to work 6 or 7 nights per week as opposed to others that only worked 2 or 3
nights per week.  He said that he knew when the busy times were and that he would make
himself available at those times.  He said he would like to do this, not only to make money,
but to provide a service to the public. 
Mr Currie confirmed that he had received a fair hearing. 
DEBATE 
Councillor Green referred to the number of taxis in the Helensburgh and Lomond area
being less than when the LVSA survey was carried out and that to his mind that would
indicate that he would be in favour of granting this licence as there appeared to still be
demand there. 
Councillor Blair agreed.  He commented that Mr Currie had been working for 4 years and
knew the area well and he hoped that he would provide an excellent service to his
customers. 
DECISION 
The Committee unanimously agreed to grant a Taxi Car Licence to Mr Currie and noted
that he would receive written confirmation of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted)
Page 12

Page 13

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 23 AUGUST 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Graham Hardie 
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Fiona Macdonald, Solicitor
Applicant
Sergeant David Holmes, Police Scotland 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Daniel Hampsey,
Paul Kennedy and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraphs
3 and 14 of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR GRANT OF
A STREET TRADER LICENCE 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of audio
call and joined the meeting by telephone. 
Police Scotland also opted to proceed by way of audio call and Sergeant David Holmes
joined the meeting by telephone. 
The Chair then outlined the procedure that would be followed and invited the Applicant to
speak in support of his application.   
APPLICANT 
The Applicant spoke in support of his application. 
Page 13 Agenda Item 3c

Page 14

QUESTIONS FROM POLICE SCOTLAND 
Sergeant Holmes was given the opportunity to ask the Applicant questions.  He confirmed
he had no questions. 
POLICE SCOTLAND 
Sergeant Holmes spoke in support of the Chief Constable’s objection. 
QUESTIONS FROM APPLICANT 
The Applicant was given the opportunity to ask Police Scotland questions.   
MEMBERS’ QUESTIONS 
The Members were given the opportunity to ask the Applicant and Police Scotland
questions. 
SUMMING UP 
Police Scotland 
Sergeant Holmes advised that he had nothing further to add. 
Applicant 
The Applicant advised that he had nothing further to add. 
When asked, both parties confirmed that they had received a fair hearing. 
DEBATE 
The Members debated the application for a Street Trader Licence. 
Motion 
To agree to refuse the application for a Street Trader’s Licence on the grounds that the
Applicant was not a fit and proper person to be the holder of the Licence. 
Moved by Councillor Kieron Green, seconded by Councillor Graham Hardie. 
Amendment 
To agree to continue consideration of this application until the conclusion of the pending
court case on 9 October 2023 and to bring the matter back to the PPSL Committee on 18
October 2023. 
Moved by Councillor John Armour, seconded by Councillor Gordon Blair 
A vote was taken by calling the roll. 
Page 14

Page 15

Motion    Amendment 
Councillor Green   Councillor Armour
Councillor A Hampsey  Councillor Blair
Councillor Hardie   Councillor Brown
Councillor Irvine
Councillor Kain
Councillor McCabe
Councillor Martin
Councillor Wallace 
The Motion was carried by 8 votes to 3 and the Committee resolved accordingly. 
DECISION 
The Committee agreed to refuse the application for grant of a Street Trader’s Licence on
the grounds that the Applicant was not a fit and proper person to be the holder of the
Licence and noted that the Applicant would receive written confirmation of this decision
within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 15

Page 16

This page is intentionally left blank

Page 17

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY
MICROSOFT TEAMS on TUESDAY, 29 AUGUST 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Graham Hardie 
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Douglas Philand
Councillor Peter Wallace 
Attending: Iain Jackson, Governance, Risk and Safety Manager
Peter Bain, Development Manager - Planning
Sandra Davies, Major Applications Team Leader - Planning
Stephen MacIntyre, MOWI – Applicant
Ben Hadfield, MOWI – Applicant
Philip Gillibrand, MOWI – Applicant
Lorraine Holdstock, Marine & Coastal Development Policy Officer – Consultee
Elaine Whyte, Clyde Fishermen’s Association – Consultee
Tavish Scott, Salmon Scotland – Supporter
Derek Keir, Camanachd Association – Supporter
Roddy McCuish, Camanachd Association – Supporter
Warren Harvey – Supporter
Craig Graham, Gael Force Group – Supporter
John Ford, Objector
Harry Nickerson, Cour Ltd - Objector
Rachel Mulrenan, Wildfish Scotland – Objector 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Daniel Hampsey,
Mark Irvine and Paul Kennedy. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MOWI SCOTLAND LTD: FORMATION OF FISH FARM (ATLANTIC SALMON)
INCORPORATING TWELVE 120M CIRCUMFERENCE CIRCULAR CAGES AND
SITING OF FEED BARGE: NORTH KILBRANNAN FISH FARM, NORTH OF
COUR BAY, KILBRANNAN SOUND, EAST KINTYRE (REF: 20/01345/MFF) 
The Chair welcomed everyone to the meeting which was being held on a hybrid basis. 
For the purposes of the sederunt Iain Jackson, Clerk to the Committee today, read out the
names of the Members of the Committee and asked them to confirm their attendance. 
Before proceeding further, the Chair addressed a preliminary matter and invited Planning
to speak to the contents of supplementary report number 3 issued on 28 August 2023. 
The Major Applications Team Leader referred to supplementary report number 3 and, in
particular, to a communication from NatureScot which Planning Officers believed was a
Page 17 Agenda Item 3d

Page 18

material consideration in the determination of this application.  It is considered that the
proposal may have likely significant effects on the Atlantic Salmon Qualifying Interests of
the Endrick Water Special Area of Conservation (SAC).  This is a European site and the
competent authority, in this case, Argyll and Bute Council, must undertake an Appropriate
Assessment.  This has been carried out and is contained as an Appendix to the main
planning report.  The conclusions of this Appropriate Assessment have been formed
based upon the advice of NatureScot.  However, yesterday morning Officers received a
letter from NatureScot advising that they were aware of new information which may
change the advice that Planning Officers have been given.  A competent authority cannot
approve planning applications unless it is shown beyond reasonable scientific doubt
through an Appropriate Assessment that the proposal would not adversely affect the
integrity of a European site.  If Members were to proceed to determine this application on
the basis of the existing Appropriate Assessment it could result in a legal challenge.  It is
understood that NatureScot should be in a position to respond within the normal statutory
timeframe of 20 working days.  Officers are aware that Members of the Committee have
been copied into a letter from MOWI but the contents of this letter do not change the
revised recommendation set out in supplementary report number 3 to adjourn the hearing
to allow NatureScot time to respond and to allow the Planning Authority to consider if this
changes the Appropriate Assessment. 
DECISION 
The Committee agreed not to commence with the Hearing today and that it be adjourned
to allow time for NatureScot to update their advice to the Planning Authority in light of the
new information received.  
(Reference: Report by Head of Development and Economic Growth dated 12 May 2023,
supplementary reports 1 dated and 2 dated 23 May 2023 and supplementary report
number 3 dated 28 August 2023, submitted)
Page 18

Page 19

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 21/01583/PP 
Planning Hierarchy: Local 
Applicant: Mr Shaun Sinclair 
Proposal: Erection of Café with Associated Landscaping including a
Viewpoint, Seating, Interpretive Sign and Play Park 
Site Address:  Land West of Inverlusragan, Connel 
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
 Erection of café building with incidental ‘drive-thru’ takeaway
 Installation of viewpoint 
 Installation of seating 
 Installation of interpretive sign
 Installation of private drainage system 
(ii) Other specified operations 
 Formation of vehicular access 
 Connection to public water infrastructure 
 Proposed landscaping 
(B) RECOMMENDATION: 
It is recommended that planning permission be REFUSED for the reasons appended
to this report. 
(C) CONSULTATIONS:   
Transport Scotland 
Finalised response dated 13/01/23 advising no objection to the proposed
development subject to conditions being imposed on the grant of permission to
Page 19 Agenda Item 4

Page 20

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
secure the appropriate construction of the access at the junction with the Trunk Road
and the clearance of the associated visibility splays. 
Argyll and Bute Council – Roads Authority 
Report dated 16/11/21 advising no objection to the proposed development subject to
a condition being imposed on the grant of permission to secure a suitable parking
and turning area to serve the development. 
Argyll and Bute Council – Environmental Health Service (EHS) 
Memo dated 17/02/23 advising no objection to the proposed development subject to
conditions being imposed on the grant of permission to secure a site traffic
management plan for the development, a noise limiting condition, and a condition to
regarding the specification for external lighting.   
Argyll and Bute Council – Biodiversity Officer (BDO)
Letter dated 08/06/22 requesting the submission of an Otter Survey and
Ornithological Survey in support of the proposed development.  Such surveys were
undertaken and submitted for consideration.  In an e-mail dated 02/08/22 the BDO
noted the contents of the reports including taking account of seasonality concerning
ornithological interest along with advice and mitigation for Otter and Bat species. The
BDO concurred with the recommendations to protect and enhance habitats and
species such pre-start checks for bird species, the provision of bat boxes and
landscaping with native trees and shrubs. The BDO advised that, if permission is
granted, planting of Ash- Fraxinus excelsior should be avoided due to Ash Die Back
being present in the area and the difficulty in purchasing this species.  The BDO
noted that Japanese Knotweed is evident and accordingly requests that a watching
brief is undertaken for the site. 
A further Otter and Breeding Bird Assessment, separate from that originally prepared
for the site, by another firm, was submitted to the Planning Authority.  In her response
to the further report, the BDO noted the contents, advising that the survey was carried
out on 1st December, outwith the optimum time of year, whereas the original
ecological report surveys were carried out over a 4 day period in early July.  The
BDO noted that the conclusions of the report are not unexpected and the
recommendations follow best practice including additional advice on the contribution
landscape planning (both planting and bird boxes) and implementation can make to
provide habitat for a variety of species.  The BDO recommended that both ecological
reports (July and January) are implemented in combination should planning
permission be granted. 
Argyll and Bute Council – Development Policy Team (DPT) 
Memo dated 14/01/22 advising that in terms of the adopted LDP Proposals Maps the
site is situated within an Open Space Protection Area (OSPA) which provides visual
amenity functions by helping preserve the open aspect on the seaward side of the
A85 and with it, public views across Loch Etive. 
Policy SG LDP REC/COM 2 sets out that the development of OSPAs will not be
permitted except where one of the five clauses set out in the policy are met. The DPT
advise that they do not consider that the proposal satisfies any of the five clauses
and as such the proposal is considered to be contrary to Policy SG LDP REC/COM
2.   
The DPT further state that the OSPA has been carried forward into pLDP2, which
was not objected to. 
Page 20

Page 21

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
In light of the comments from the DPT, the Agent submitted a report on the OSPA
which is discussed in more detail in the assessment of the application at Appendix A
where the further comments of the DPT in a memo dated 25/05/22 are detailed. 
Scottish Water 
Letter dated 16/11/21 advising no objection to the proposed development which
would be serviced from the Tullich Water Treatment Works.  Scottish Water do
however advise that further investigations may be required once an application for
formal connection is submitted to them for consideration. 
JBA Consulting Ltd (JBA) 
Report dated 01/12/21 advising no objection to the proposed development. 
Connel Community Council (CCC) 
Letter dated 01/12/21 advising, in summary, that the Local Development Plan (LDP)
allocates the site as an Open Space Protection Area and any decision to reverse this
for financial benefit of an individual landowner is not one that should be made.  If the
application is successful, it would seriously undermine the LDP going forward.  The
rules relating to these areas are set out in the LDP and there is nothing in the
application, in the opinion of the CCC, that remotely meets the criteria that would
enable the development to be supported. 
(D) HISTORY:   
03/01550/DET
Construction of new pumping station, septicity building, access road and ancillary
works (SPS 2) – Withdrawn: 31/12/03 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 and Neighbour
Notification procedures, overall closing date 16/12/01. 
(F) REPRESENTATIONS:   
At the time of writing, representations have been received by the Planning Authority
from 165 respondents in relation to this planning application. 44 respondents raise
objection, 120 provide support and 1 submits a representation. 
Of the 120 expressions of support, 51 of these comprise a pro-forma letter completed
with the respondents names and addresses with 66 comprising a pro-forma slip
submitted to the Applicant during a Community Council Meeting held on 09/05/22
and then passed to the Planning Authority.   
In addition to the above, a screenshot from Facebook with names and ‘likes’ for the
development on the Applicant’s personal Facebook page has been submitted. 
The names and addresses of those contributing to the application are contained
within Appendix B of this report with full copies of the representations published on
the planning application file available to view via the Public Access section of the
Council’s website.
Page 21

Page 22

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(i) Summary of issues raised – Objection   
Validity of Application 
 Comments regarding the validity of the planning application in relation to
the Heads of Planning Scotland (HOPS) – Validation Guidance Note (the
submission provides extracts from the HOPS guidance along with
correspondence from various Scottish Public Services Ombudsman
cases in support of the comments provided). 
Officer Comment: With regards to the above, it should be noted that the
HOPS National Validation Standards document is an advisory as opposed
to a statutory requirement in the validation of planning applications.  The
HOPS document is endorsed by the Council as Planning Authority as an
example of good practice and published on the Council’s website to assist
prospective applicants on the preparation of their planning applications, and
is utilised to inform the standards sought by the Central Validation Team
when registering new applications. 
The content of the HOPS document is, however, provided as guidance to
assist applicants with the preparation of documentation that first and
foremost meets minimum Regulatory requirements, but also provides that
information within a consistent format to assist the Council with the
processing of the application, it is noted that the HOPS guidance promotes
an enhanced level of information that exceeds minimum Regulatory
standards. The HOPS document is advisory and accordingly is applied at the
sole discretion of the Council as Planning Authority in its validation of
applications submitted for consideration. 
Notwithstanding the above, it is considered that the information supplied with
the application and subsequently assessed by the Planning Authority is
sufficient in its scope, detail and accuracy so as to present an appropriately
clear description of the development proposed without being wilfully
misleading or ambiguous. 
Compliance with National and Local Policy 
 The proposal conflicts with NPF4 and LDP Policies 
Officer Comment:  The proposal is fully assessed against the relevant
NPF4 and LDP Policies in the assessment contained within Appendix A of
this report. It is recommended that planning permission be refused. 
Open Space Protection Area (OSPA) 
 The village of Connel’s character and amenity is significantly enhanced
by its visual relationship with both the sea and also, importantly, with
Connel Bridge which is reflected in the designation of the site in the Local
Development Plan as an OSPA, put in place to protect the character of
Connel and provide both amenity space and protection of vistas from the
village to both the sea and the bridge for residents and visitors. 
Page 22

Page 23

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 The Community Council worked hard to ensure that all of the undeveloped
shoreline between the main road and sea, including the application site,
was covered by the OSPA designation. 
 The proposed development will be highly visible from the northern end of
Connel Bridge and also highly visible from the water of Loch Etive under
Connel Bridge, Connel Bridge and the North Connel/Bonawe road. 
 The application should be carefully considered, as, should permission be
granted, it will set a precedent for future development within the OSPA
and other OSPAs. 
 The loss of the OSPA to the proposed development will have a profound
impact on the character of Connel and its appeal as a place to live and for
tourists. 
 Policies contained within the Local Plan, specifically Policy LDP 8 and
Policy SG LDP REC/COM 2 preclude the development of OSPAs. 
Officer Comment: The proposed development, and its impact on the OSPA,
is fully considered in the assessment of the application within Appendix A of
this report. It is recommended that planning permission be refused. 
Critiquing the Agents Report on the OSPA 
 The stretch of shoreline to the West of Connel Bridge is not the only area
of shoreline of active open space as indicated in the report.  The wooded
area of shoreline to the east of Connel Bridge, between the site and
Connel Surgery and the foreshore of the application site are already used
by the community and tourists alike for walking, fishing, observing wildlife,
watersports, dog walking, and photography.  Contrary to the report, the
wooded foreshore is very accessible and, contrary to the report, there is
a very accessible access road to the foreshore from the main road to the
east of the site. 
 There are significant concerns regarding the proposed playpark being
located within the site with young children having to cross the main A85
trunk road.  The play park is situated near the Lusragan Burn estuary with
a steep embankment beside a tidal loch with strong currents, tidal surges
and flooding which will potentially leady to drowning fatalities. 
The existing playpark at Powell Place is available to all children in Connel
and can be accessed via a safe pedestrian route away from the A85.  The
proposed playpark cannot be compared the existing one at Powell Place. 
 Connel already has numerous options available for the community to
gather.  Permission has been granted to the Applicant for a café; there is
the community playing field at Achaleven, the Village and Church Halls. 
There are also outdoor and indoor eating facilities at the Oyster Inn and
Falls of Lora Hotel.  The Connel Surgery has a community café with
disabled access and extensive parking with Connel Village Shop
providing a takeaway food and drink service. 
Page 23

Page 24

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 The report highlights the advantages of siting the café to the east of the
site, however, it does not highlight that there will be a prominent car-park
and vehicles affecting the visual amenity from the west, particularly at the
higher part of the A85, at Connel village loop road junction. 
 Visual amenity does not just apply to views merely from the A85, there
are other important viewpoints that need to be considered in this
application.  It is crucial to consider the wider panoramic views to
Muchairn, Ben Cruachan and the Kilmaronaig Islands, which will be
adversely affected by elevated views into the site. 
 Contrary to the report, there are no existing buildings adjacent to the west
of the site until you reach Connel Surgery and the doctor’s house.  The
site is not an infill opportunity as set out in the report. 
 Any mention of EPS in the report is conspicuous by its absence as is any
mention of mitigating measures to protect the bats, herons, seals, herring
gulls and shags from the detrimental effects of traffic noise, light pollution
and other associated café/car park disturbances. 
The area is well known for Otter, video evidence of which has previously
been submitted, furthermore, there are nesting swans adjacent to the site
and bats are in abundance using the site as a feeding ground.  The
engineering and landscaping works will adversely affect the river bank
and loch shore line with light pollution and vehicle noise impact on this
sensitive biodiversity site. 
Officer Comment: This critique of the report on the OSPA submitted by the
Agent is noted by the Planning Authority.  The proposed development, and
its impact on the OSPA, is fully considered within Appendix A of this report.
It is recommended that planning permission be refused. 
History of Shoreside Planning Applications 
 The issue of development on the shore side of the A85 has already been
the subject of previous planning applications as follows. 
05/00697/DET, 05/00698/DET and 05/00699/DET for three
dwellinghouses between the application site and Connel Surgery were
refused at appeal (non-determination) on 22/09/05 
In their determination to the three dwellinghouses, the Scottish
Government appointed Report recommended that the south shore of
Connel with views from North Connel, Connel Bridge, from leisure boats
and water sports enthusiasts in the loch should also be protected, by way
of an OSPA designation in the up and coming Local Plan at that time. 
This recommendation was supported by Argyll and Bute Council, Connel
Community Council, Visit Scotland and many Connel residents.   
Argyll and Bute Council Planning recommendation to the Report was that’
the proposal would if approved set a precedent for further development
on this rural strip which the Council would find difficult to refuse”.  The
Council should adhere to their previous permission and preserve and
Page 24

Page 25

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
protect the natural wildlife and scent environment by keeping it as an
OSPA and refusing planning permission. 
05/00523/OUT and 11/00536/PPP for the site for erection of a
dwellinghouse on land opposite Ards Guest House were withdrawn on
20/06/06 and 10/11/11 respectively. 
Officer Comment:  These comments are noted by the Planning Authority as
an accurate summary of the relevant planning history. It is recommended
that planning permission be refused.   
Impact on Wildlife, Biodiversity and Habitats 
 The application site is extensively used by local wildlife including otter,
water vole, bats and many different bird species, some of these being
European Protectected Species (EPS). 
 The proposed development will have a significant adverse impact on the
species detailed above as well as the wider biodiversity of the site. 
 No independent Environmental Impact Assessment has been carried out
in relation to the application and accordingly a video survey was submitted
by third parties. 
 Concerns regarding the validity of the Ecological Reports submitted in
support of the application. 
 The so called ‘Environmental Survey’ is not, as it claims, an
Environmental Impact Assessment (EIA). 
 The impact of the development on the tree and hedgerow on the eastern
boundary of the site has not been addressed. 
Officer Comment: Two separate Otter and Breeding Bird Surveys have
been submitted in support of the application, details of which have been
considered by the BDO and which are discussed in more detail in the
assessment of the proposal in the full report within Appendix A of this report. 
The reports have been prepared by suitably qualified ecologists and the
Planning Authority has no reason to doubt their validity. 
The application does not constitute EIA development requiring the
submission of an Environmental Impact Assessment. 
As the Planning Authority is not supporting the principle of the proposed
development, details of landscaping, hedgerow retention/protection and
biodiversity enhancement measures were not sought.  Should permission be
granted, such details could be secured by a suitably worded condition
imposed on the grant of permission. 
Existing Use of Site 
Page 25

Page 26

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 The details provided in the planning application are erroneous, the area
of ground has not had grazing animals on it for approximately 5 years. 
Officer Comment: This comment is noted by the Planning Authority. 
Existing Planning Permission/Alternative Sites 
 Permission for a café in the village has already been granted and
therefore there is no need to intrude on the valuable OSPA. 
 It is puzzling why the Applicant is applying for planning permission for this
site when permission has already been granted for a café elsewhere in
the village. 
 There are less obtrusive and damaging sites available. 
Officer Comment: Whilst these comments are noted by the Planning
Authority, every planning application is considered on its own merits.  The
application is assessed in full in Appendix A of this report. 
Flood Risk 
 The site is at risk of flooding and therefore the development if approved
will be at risk of flooding. 
Officer Comment:  The application site is outwith the coastal and river flood
zones necessitating consultation with SEPA.  In their response to the
application, the Council’s flood advisors, JBA Consulting Ltd, raised no
objection. 
Road and Pedestrian Safety Issues   
 The access will affect the site’s flooding and visual impact, with
illustrations submitted by third parties showing the impact. 
 Over the years, traffic in the village has become heavier, with a further
access onto the road, there is the potential of accidents happening,
perhaps fatal. 
 The road network is unable to cope with the increased demand in Connel,
North Connel and Oban. 
 The building of a play park, on the opposite site of a busy main road,
without a crossing point, would encourage children to cross the road
unsupervised. 
 This stretch of road is increasingly being used to overtake slower vehicles
despite the 30mph signs being in place. 
 The Applicant is applying for a ‘departure’ from Transport Scotland
regarding access specifications.  If there are to be shoreline defences, re-
contouring or natural coastline features and/or landraising …. Are these
all yet more acceptable ‘departures’ from planning policy that can be
justified in an OSPA. 
Page 26

Page 27

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 A further junction onto the A85 could be very hazardous. 
 The development will require a seawall of some form with railings for
safety and an assessment will have to be made as to how these measures
will affect the flood risk elsewhere. 
 The drive thru element will likely increase the use of private car trips to
the site. 
 The proposal makes no provision for low or zero-emission vehicle and
cycle charging points and there is no safe, secure and convenience cycle
parking to meet the needs of users. 
 The layout has not been designed in a way to incorporate safety
measures for safe crossing/walking/wheeling within the site. 
 The drive through aspect of the development will not make good use of
the site with customers sitting in their cars instead of using the space
effectively. 
 Car engines idling, releasing carbon, is not environmentally friendly given
the current emphasis and focus being placed on climate change. 
Officer Comment: The Agent has worked closely with Transport Scotland
to agree a suitable access regime to serve the proposed development and
has agreed a regime that does not raise any road or pedestrian safety issues. 
With regards to pedestrian safety relating to the play park, the Planning
Authority sought comments from Transport Scotland who advised that: 
“The associated viewpoint with play area would appear to be of a small scale.
Consequently, while it may be the intention to allow its use by the wider
community, it is more likely to be used by the children of visiting patrons of
the proposed development. We are also aware that there is existing
development on the same side of this 30mph section of A85 trunk road such
as the Connel Surgery and Pharmacy and Achaleven Primary School.  
Based on the above, and having discussed this matter further internally, we
do not have any specific road and pedestrian safety concerns with this
aspect of the proposal”. 
The Council’s EHS advised that, should permission be granted, a condition
be imposed to secure a site traffic management plan for the proposed
development. 
With regards to the drive through aspect of the development, this is an
ancillary part of the main development which is a sit in café facility. 
As the Planning Authority is not supporting the principle of the proposed
development, details of cycle parking etc. were not sought.  Should
permission be granted, such details could be secured by a suitably worded
condition imposed on the grant of permission. 
Page 27

Page 28

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Noise/Odour 
 The proposed development will result in a substantial increase in noise to
the detriment or residential properties. 
 No details of the proposed kitchen ventilation has been provided, this
could have an adverse impact on the neighbouring dwellinghouse. 
Officer Comment: The Council’s EHS raised no objection to the proposed
development subject to a noise limiting condition and a condition to regarding
the specification for external lighting being imposed on any permission
granted.  The EHS will deal directly with the Applicant regarding the kitchen
specification should permission be granted. 
Public Gathering 
 The Applicant organised a gathering of people to discuss the planning
application, however, the opinions voiced at this gathering reported in the
press are not representative of the village of Connel.  For example, the
press article and the gathering failed to mention that the Applicant already
had planning permission for a café elsewhere in the village. 
Officer Comment:  Whilst this comment is noted by the Planning Authority,
this public gathering was not part of the planning process relating to the
planning application. 
General 
 The proposed café would have an adverse impact on the viability of the
local shop. 
 Access to the foreshore must not be restricted by the proposed
development should it proceed. 
 The proposed development will undermine the neighbouring land 
Officer Comment: Business competition is not a material planning
consideration.   
Should access to the foreshore become an issue should the development
proceed, this would be a matter for the Council’s Access Officer. 
Structural stability will be addressed at Building Warrant stage should the
proposed development proceed. 
Mr and Mrs Pat Howe – Specific Objections 
 Specific comments submitted from Pat and Cheryl Howe relating to
concerns over inconsistencies in the drawings submitted to Transport
Scotland with regards to the access and visibility splay arrangements and
the proximity of the development to their boundary. 
Officer Comment:  As a result of these specific access comments, the
Agent and Transport Scotland were consulted who clarified the situation
Page 28

Page 29

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
between them advising that “Mr and Mrs Howe appear to have
misinterpreted the site plan (Dwg. Ref. 20100 01 J). The plan has been
plotted using Ordnance Survey base maps and have been plotted according
to the boundary fence marked thereon. The trees on the plan that Mr and
Mrs Howe claim that are existing within their property are actually proposed
landscaping to provide screening to the adjacent property and are not yet
planted. These are proposed entirely within the Applicant’s property. 
The Application Boundary therefore reflects the ownership certificate
submitted and no amendment to either the Application Boundary or the
Ownership Certificates is required. 
Following Mr Howe's initial objection and discussions with Transport
Scotland, we procured and received a topographical survey which highlights
that the height of the bridge parapet is below that of the 1.05m as shown on
drawing 0425-013-P03 [attached]. We would also note that this has been
scrutinised by Transport Scotland in line with CD-123, an additional
requirement was requested that a full visibility splay of between 0.26m and
2.0m from ground level at the extent of the visibility splay is to be required.
Which confirms that the bridge parapet is at a suitable height to comply with
both requirements”. 
(ii) Summary of issues raised – Support   
 Pro-forma letter of support 
Noting that the current application is proposed to replace the planning
permission approved for the café on the opposite side of the road with
the current proposal addressing concerns previously raised by the
Community Council and local residents regarding road safety, parking
and congestion as well as privacy and amenity issues.  The current
proposal addresses all of these matters. 
The proposed development will bring significant benefits to Connel,
without any of the potential adverse impacts of the other site.  The village
lacks a café facility of this kind, which will act as a social hub for local
residents.  It will allow locals to access café facilities without travelling
outwith the village, thereby promoting sustainable travel patterns and
supports social inclusion. 
The proposed café will also have wider economic benefits to the village
by supporting the visitor economy.  The new lochside location will be a
far more attractive destination for both locals and visitors than the original
scheme, making the most of the village’s scenic location. 
It is understood that the site is part of an OSPA in the LDP, which aims
to preserve amenity, in particular views across Loch Etive from the A85. 
It appears that the development will not impact on views from the A85
due to the position of the building.  It will in fact benefit the village’s
amenity by providing a play park and seating area by the loch shore, for
use by locals and visitors.  There is currently no access to the seaward
site of the A85 in this part of Connel. 
The Council are urged to support the application to secure these positive
benefits from Connel.  
Page 29

Page 30

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 A café and community hub is sorely lacking in the village and will
contribute to the revival of a community which should be as vibrant and
thriving as others in North Argyll. 
 The proposal will create jobs in the village which has very few job
openings given the lack of business. 
 Although the community is hugely in favour of the development, the
Community Council’s stance is disappointing, which ignores the views of
the people they are supposed to represent. 
 A playpark which is not contained within a housing estate will surely be
an asset for families. 
 It would be good to see a disused piece of land used for the good of many
people rather than a few. 
Officer Comment:  These expressions of support are noted by the Planning
Authority.  The impact of the proposed development on the landscape and
its economic benefit are assessed in the full report in Appendix A. It is
recommended that planning permission be refused and it is not considered
that any limited community and economic benefit is sufficient to outweigh the
landscape and settlement strategy harm caused by development within the
OSPA. 
(iii) Summary of issues raised – Representation   
 While the ODAP is broadly supportive of the principle of this proposal, there
are a number of concerns that need to be addressed if the proposal is to be
“inclusive” and meet the requirements of the Scottish Government’s Planning
Advice Note 78 which contains an expectation that new developments should
be designed so that they can be used by everyone, regardless of age, gender
or disability. The issues that need clarification are: 
Provision of at least one dedicated disabled parking bay 5 x 3.7m located
with 40m of the entrance to the café and surfaced in a bound non-slip
material. 
Provision of a 2m wide pathway, again of a bound non-slip material linking
the said parking bay to the main entrance to the café. 
Confirmation that the path linking the car park to the viewpoint will be a
minimum of 2m wide and finished in a bound non-slip surfacing material. 
The “accessible toilet” shown on the floorplan would be inaccessible to
wheelchair users.  It should be a minimum of 1700mm x 2200mm. (BS8300). 
Confirmation that the café and decking areas will include flexible (as opposed
to fixed) seating to enable their use by wheelchair users and others with
mobility difficulties.   
Page 30

Page 31

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The main entrance is only 750mm wide and the lobby between it and the
secondary entrance has insufficient length (taking account of the inner door
swing) for an assisted wheelchair user to comfortably enter and exit the
building (see BS8300 – 8.2.5.2). This should be addressed now as it will have
implications on the appearance of the building. Ideally the main entrance
should have 1m clear effective opening width. 
While the Panel is happy to support the principle of this exciting proposal we
strongly recommend that consideration be deferred until these issues have
been addressed and resolved.  
Officer Comment: These comments are noted and will be brought to the
attention of the Applicant should planning permission be granted against
officer recommendation.   
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☒Yes ☐No A
Supporting Statement
has been submitted in
support of the application
which is discussed in
more detail in the
assessment of the
application within
Appendix A of this report. 
(iv) A report on the impact of the proposed
development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☒Yes ☐No Two
Ecological Assessments
have has been submitted
in support of the
application which are
discussed in more detail
in the assessment of the
application within
Appendix A of this report   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
Page 31

Page 32

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 28 – Retail
NPF4 Policy 29 – Rural Development 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 5 –Supporting the Sustainable Growth of our Economy
LDP 7 – Supporting our Town Centres and Retail 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity 
Landscape and Design 
Page 32

Page 33

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
SG LDP ENV 14 – Landscape 
Retail Developments (Including COU to and from Shops) 
SG LDP RET 3 – Retail Development in the Key Rural Settlements, Villages and
Minor Settlements 
Bad Neighbour Development 
SG LDP BAD 1 – Bad Neighbour Development 
Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development 
Addressing Climate Change 
SG LDP SERV 7 – Flooding and Land Erosion – Risk Framework 
Transport (Including Core Paths) 
SG LDP TRAN 2 – Development and Public Transport Accessibility
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
 Third Party Representations
 Consultation Reponses
 ABC Technical Note – Biodiversity (Feb 2017) 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 has now concluded and the Examination Report has been
published (13th June 2023). The Examination Report is a material consideration of
significant weight and may be used as such until the conclusion of the LDP2
Adoption Process. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non
Notifiable Modifications is a material consideration in the determination of all
planning and related applications. 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development
Page 33

Page 34

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development 
Diverse and Sustainable Economy 
Policy 22 – Economic Development 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 46 – Retail Development – The Sequential Approach
Policy 55 – Flooding
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 81 – Open Space Protection Areas 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No 
(N) Does the Council have an interest in the site:  ☐Yes ☒No 
(O) Requirement for a pre-determination hearing: ☐Yes ☒No (if Yes insert details
below) 
In deciding whether to hold a discretionary hearing Members should
consider: 
Page 34

Page 35

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 How up to date the Development Plan is, the relevance of the
policies to the proposed development, and whether the
representations are on development plan policy grounds which
have recently been considered through the development plan
process. 
 The degree of local interest and controversy on material
considerations, together with the relative size of community
affected, set against the relative number of representations and
their provenance. 
At the time of writing, representations have been received by the
Planning Authority from 165 respondents in relation to this planning
application. 44 respondents raise objection, 120 provide support and
1 submits a representation. 
Of the 120 expressions of support, 66 of these were submitted to the
Applicant during a Community Council Meeting held on 09/05/22 and
then passed to the Planning Authority.   
In addition to the above, a screenshot from Facebook with names and
‘likes’ for the development on the Applicant’s personal Facebook page
has been submitted. 
NPF4 was adopted on 13/02/23 which now represents the main policy
background against which proposed developments are assessed
underpinned by the Policy and Supplementary Guidance contained
within the adopted ‘Argyll and Bute Local Development Plan’ 2015
(LDP) 
NPF4 Policy 9(b) states that proposals on greenfield sites will not be
supported unless the site has been allocated for development or the
proposal is explicitly supported in the LDP.   
The site has been designated as an OSPA in the adopted LDP and
emerging pLDP2 where Policies SG LDP REC/COM 2 and Policy 81,
respectively, do not permit development on OSPAs except in a
number of very specific circumstances details of which are discussed
in more detail in the full report contained in Appendix A. 
The proposed development within the OSPA conflicts with both
National and Local Policy and therefore, in this instance, the proposal
represents a clear policy refusal and it is not considered that a hearing
would add anything to the planning process.  
(P)(i) Key Constraints/Designations Affected by the Development: 
 Open Space Protection Area 
(P)(ii) Soils
Agricultural Land Classification:  Unclassified Land 
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
Page 35

Page 36

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 (tick all relevant boxes) 
☐Main Town Settlement Area
☐Key Rural Settlement Area
☒Village/Minor Settlement Area
☐Rural Opportunity Area
☐Countryside Zone
☐Very Sensitive Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy
(tick all relevant boxes) 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs
etc: 
N/A
ABC pLDP2 Allocations/PDAs/AFAs
etc: 
N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
The proposal the subject of this application is seeking to secure planning permission
for the erection of a cafe with incidental ‘drive-thru’ takeaway plus associated
landscaping including a viewpoint, seating, interpretive sign and play park. 
In terms of the Settlement Strategy set out in the adopted LDP, the application site
is situated within the defined Minor Settlement of Connel where Policies LDP STRAT
1 and LDP DM 1 might ordinarily be expected to give general encouragement to
small scale development on appropriate sites subject to compliance with other
relevant policies and Supplementary Guidance (SG). 
Page 36

Page 37

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
However, the site the subject of this application is within an Open Space Protection
Area (OSPA) where Policy SG LDP REC/COM 2 does not permit development on
an OSPA unless it satisfies one of the 5 criteria listed in Policy SG LDP REC/COM2. 
The OSPA the subject of this planning application provides visual amenity functions
rather than recreation functions and accordingly it is not considered that the proposed
development satisfies any of the 5 criteria set out in Policy SG LDP REC/COM 2 and
accordingly the proposal is considered contrary to the provisions of this policy. 
The application site is situated within the minor settlement of Connel comprising an
area of deliberately undeveloped and open land situated between the A85 Trunk
Road and the shores of Loch Etive. 
The site is bounded along its eastern boundary by Inverlusragan, a residential
dwellinghouse.  The site slopes down gently from the A85 to the shores of Loch Etive. 
The application proposes a contemporary designed, single storey flat roofed
structure sited along the western boundary of the site finished in natural stone
cladding with a dark grey coloured metal roofing.  The application shows the
proposed café oriented with its main elevation and external seating area north to take
advantage of views out towards Loch Etive.  The application shows the café dug into
the sloping site to help minimise its visual impact.   
An existing vehicular access is to be upgraded to serve the proposed development
with water supply via connection to the public water main and foul drainage by way
of a new private system due to the lack of public infrastructure within the vicinity of
the site. 
The proposed parking area is shown to the west of the proposed café building with
a turning circle adjacent to the building to facilitate the proposed ‘drive through’.  The
play park and view point are proposed to the north of the proposed café building
between the building and the shores of Loch Etive.   
The proposal has elicited representations from 165 respondents.  44 respondents
raise objection, 120 provide support and 1 submits a representation. 
The OSPA in this location helps preserve the open aspect of the land on the shore
side of the road and along with it the public views.  It should be recognised that the
OSPA forms part of the wider network of OSPAs alongside Loch Etive that, together,
provide the wider function of preserving the undeveloped aspect of the shore side of
the road.  Development within this OSPA with the proposal subject of this planning
application would represent the piecemeal erosion of the wider OSPA network and
would potentially lead to pressure for development within other designated OSPAs
either side of Loch Etive, thereby undermining their functions.
The development the subject of this application would introduce built development
and infrastructure into a greenfield site which has been designated as an OSPA for
its visual amenity functions as detailed above. 
The proposed development would result in an adverse environmental impact eroding
the open aspect of the site and the associated public views across it thereby
undermining the OSPA designation of the site. 
Page 37

Page 38

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Whilst the potential economic and community benefit arising from the proposed
development is noted, it is not considered that this is sufficient to set aside the
detrimental impact that the proposed development will have on the open landscape
character of the area and the primary function of the OSPA to protect this together
with important public views of Loch Etive which give the settlement of Connel much
of its unique character. 
In light of the above it is recommended that planning permission is refused. 
A full report is provided in Appendix A of this report. 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission should be Refused 
See reasons for refusal below. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Fiona Scott  Date: 04/09/23 
Reviewing Officer: Tim Williams Date: 05/09/23 
Fergus Murray
Head of Development & Economic Growth 
Page 38

Page 39

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 23/01583/PP 
1. NPF4 Policy 9(b) states that proposals on greenfield sites will not be supported unless
the site has been allocated for development or the proposal is explicitly supported in
the adopted ‘Argyll and Bute Local Development Plan’ (LDP) 2015. 
In terms of the LDP, development of the site is not supported as the site is within an
adopted Open Space Protection Area (OSPA) where Policies LDP DM 8 and SG LDP
REC/COM 2 do not permit development unless it accords with five specific criteria. 
The OSPA in question is an area of land which is considered to provide visual amenity
functions rather than recreational functions and therefore the proposal does not satisfy
any of the criteria set out in SG LDP REC/COM 2. 
The OSPA has been designated to provide visual amenity functions by helping
preserve the open aspect on the seaward side of the A85 and with it, public views
across Loch Etive.  The OSPA forms part of the wider network of OSPAs alongside
Loch Etive that, together, provide the wider function of preserving the undeveloped
aspect of the shore side of the road.   
The development the subject of this application would introduce built development and
infrastructure into a greenfield site which has been designated as an OSPA for its
visual amenity functions which would result in an adverse environmental impact
eroding the open aspect of the site and the associated public views across it thereby
undermining the OSPA designation of the site contrary to the provisions of NPF4
Policy 9 as underpinned by LDP Policies LDP8 and SG LDP REC/COM 2 and Policy
81 of the emerging LDP2. 
It is not considered that the proposed development would constitute an appropriate
departure to National or Local Planning Policy. 
Page 39

Page 40

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  21/01583/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The proposal the subject of this application is seeking to secure planning permission for
the erection of a cafe with an incidental ‘drive-thru’ takeaway plus associated landscaping
including a viewpoint, seating, interpretive sign and play park. 
As a background to the current application, Members should note that planning
permission, reference 20/00038/PP, was granted to the Applicant in January 2021 for a
café on a site to the west of Dalrannoch, on the opposite side of the public road to the
current application. 
The Supporting Statement (SS) submitted with the application details that the proposal is
effectively for a replacement café on greenfield land located by the shore of Loch Etive. 
The SS details that, after careful consideration, the Applicant has decided that the location
of the proposed café approved under the aforementioned permission is not the best
proposal for Connel or its future business prospects.  Since permission was granted the
Applicant has obtained control of the site subject of the current application. 
The SS details that the Applicant is now of the opinion that this proposed site is a better
location for the proposed café venture.  As well as business reasons, the change in
location takes into account the feedback from neighbours and the Community Council
during the processing of the previous application in relation to access, parking, noise and
amenity issues. 
Officers do not accept that there is any good reason why the previous café permission
cannot be implemented and therefore rejects the claim that the current development is
somehow a ‘replacement’ café.  
2. Location of Development 
2.1. The application site is situated within the minor settlement of Connel comprising an area
of deliberately undeveloped and open land situated between the A85 Trunk Road and the
shores of Loch Etive. 
The site is bounded along its eastern boundary by Inverlusragan, a residential
dwellinghouse.  The site slopes down gently from the A85 to the shores of Loch Etive. 
3. Settlement Strategy 
3.1 In terms of the Settlement Strategy set out in the adopted LDP, the application site is
situated within the defined Minor Settlement of Connel where Policies LDP STRAT 1 and
LDP DM 1 might ordinarily be expected to give general encouragement to small scale
development on appropriate sites subject to compliance with other relevant policies and
Supplementary Guidance (SG). 
However, the site the subject of this application is within an Open Space Protection Area
(OSPA) where Policy SG LDP REC/COM 2 does not permit development on an OSPA
unless it satisfies one of the 5 criteria listed in the Policy and discussed below. 
Page 40

Page 41

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The OSPA the subject of this planning application provides visual amenity functions rather
than recreation functions and accordingly it is not considered that the proposed
development satisfies any of the 5 criteria set out above and therefore the proposal is
considered to be contrary to the provisions of Policy SG LDP REC/COM 2. 
It is considered that there is sufficient alignment in the assessment of the proposal against
both provisions of the current LDP and the pLDP2 (as modified) that a decision can be
made under the current development plan without giving rise to fundamental conflict with
pLDP2 (as modified). 
In order to address the determining issues, the key considerations in this application are: 
3.1.1. Compliance with the Development Plan and other relevant planning policy
3.1.2. Any other material considerations. 
4. Proposal 
4.1. The application is seeking to secure planning permission for the erection of a cafe with
incidental ‘drive-thru’ takeaway plus associated landscaping including a viewpoint,
seating, interpretive sign and play park.   
The application proposes a contemporary designed, single storey flat roofed structure
sited along the western boundary of the site finished in natural stone cladding with a dark
grey coloured metal roofing.  The application shows the proposed café oriented with its
main elevation and external seating area north to take advantage of views out towards
Loch Etive.  The application shows the café dug into the sloping site to help minimise its
visual impact.   
The Supporting Statement (SS) submitted with the application details that the proposed
café will provide seating inside for 24 covers with a further 24 covers available on the
outdoor seating area.  The kitchen will be contained to the rear of the building along the
southern boundary of the site with the servery situated in the south western corner of the
building where an external servery hatch is proposed to serve drive through customers. 
The SS details that the proposed café will serve hot and cold food which will be for
consumption on the premises and also off the premises via the drive through facility
incorporated into the building.   
The proposed parking area is shown to the west of the proposed café building with a
turning circle adjacent to the building to facilitate the proposed ‘drive through’.  The play
park and view point are proposed to the north of the proposed café building between the
building and the shores of Loch Etive.   
An existing vehicular access is to be upgraded to serve the proposed development with
water supply via connection to the public water main and foul drainage by way of a new
private system due to the lack of public infrastructure within the vicinity of the site. 
5. Compliance with National Policy 
NPF4 was adopted on 13 February 2023 which now represents the main policy
background against which proposed developments are assessed underpinned by the
Policy and Supplementary Guidance contained within the adopted ‘Argyll and Bute Local
Development Plan’ 2015 (LDP).
Page 41

Page 42

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The relevant NPF4 Policies are detailed below and grouped into topic areas. 
5.1. NPF4 Policy 1 – Tackling the Climate and Nature Crises 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it requires
to be applied together with other policies in NPF4. 
Guidance from the Scottish Government advises that it is for the decision maker to
determine whether the significant weight to be applied tips the balance in favour for, or
against a proposal on the basis of its positive or negative contribution to climate and
nature crises.   
5.2. NPF4 Policy 2 – Climate, Mitigation and Adaption 
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to minimise
lifecycle greenhouse gas emissions as far as possible, and that proposals will be sited
and designed to adapt to current and future risks from climate change. 
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis is on
minimising emissions as far as possible, rather than eliminating emissions. It is noted that
the provisions of the Settlement Strategy set out within Policy LDP DM 1 of the ‘Argyll and
Bute Local Development Plan’ 2015 (LDP) 1 promotes sustainable levels of growth by
steering significant development to our Main Towns and Settlements, rural growth is
supported through identification of Key Rural Settlements and safeguards more sensitive
and vulnerable areas within its various countryside designations. 
5.3. NPF4 Policy 3 – Biodiversity 
NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver positive
effects from development and strengthen nature networks. 
The application is accompanied by an Otter and Nesting Bird Survey Report undertaken
by Transtech Ltd dated 05/07/22.   
It should be noted that the Dr Garret Macfarlane and Barbara Macfarlane of Transtech
Ltd submitted expressions of support to the proposed development prior to being
contracted to undertake the Otter and Nesting Bird Survey Report sought by the Council’s
BDO. 
Third parties raised concerns regarding a potential conflict of interest in this regard and
accordingly the Planning Authority sought a comment from the Agent.  Barbara
Macfarlane of Transtech Ltd advised “As a company we are bound by a strict code of
conduct and it is our duty to report findings accurately. All our work is carried out to the
highest standard and we have never had our professional integrity questioned. 
As a qualified and experienced ecologist with a special interest in otters, including
membership of the International Union on the Conservation of Natures Otter Specialist
Group in recognition of my work to help conserve otters in Scotland and a holder of a
NatureScot licence in respect of otters, I will always do my utmost to ensure the protection
of the species and indeed any species, if it is apparent that it may be under threat. If it
has been suggested otherwise, this would be calling into question my professional
integrity. 
Page 42

Page 43

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
In summary, I do not believe that there is a conflict of interest in this case as our findings
strictly followed ecological survey protocol and we reported the facts entirely truthfully”. 
Notwithstanding the foregoing, the Agent commissioned a further Otter and Breeding Bird
Assessment prepared by JDC Ecology Limited dated December 2022 in support of the
proposed development. 
Both reports are summarised as follows. 
Transtech Ltd (July 2022) 
In summary, the report detailed that “An ecological field survey was undertaken to
establish the potential for the presence of otters within 250 m of the development site. It
was concluded that, while the habitat within the survey radius has moderate potential to
support otters, despite intensive searching no evidence of otter use, holts or resting
places was found. 
As such, it is unlikely that any work to the site will have any detrimental effect on otters.
Nor is it felt that the day-to-day operation of the café and playpark will impact upon any
otters which forage along the shoreline. Therefore, this work does not require a species
protection plan and no European Protected Species Licence in respect of otters need be
sought. 
However, given the known presence of foraging otters along the stretch of coastline
adjacent to the site, recommended mitigation measures and an emergency procedure for
otters is contained in the report. 
A targeted ground nesting bird survey was also carried out to establish the
presence/absence of ground nesting birds within the proposed development site, while
tree and scrub nesting birds were also considered. 
Several bird species were found to be nesting within the site or within 10 m of its boundary
and it is therefore recommended that no works, including site preparation and ground
clearance, be undertaken during the breeding bird season (March to August inclusive). 
It is recommended that a site walkover be conducted by a qualified ecologist, immediately
prior to works commencing and that a toolbox talk be given to site workers at that stage,
in order that all species are considered during the development stage of the proposal”. 
The report concluded that “given the evidence of the presence of nesting birds on the site,
it is the conclusion of this survey that there are nests which would be at risk of disturbance
if work was to be undertaken between March and August. Therefore, it is recommended
that works be undertaken only out with this period. 
Should this not be possible, checks will need to be made for nesting birds immediately
prior to works commencing and mitigation measures put in place should nests be
identified at that time. 
The report also set out opportunities for biodiversity gain within the proposed
development. 
JDC Ecology Ltd (December 2022) 
In summary, the report detailed that “While otters are present in the area, moving along
the adjacent burn corridor to and from the loch, there is no evidence for use of the Site by
Page 43

Page 44

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
otter and little suitability for this species to shelter on the Site due to proximity to human
disturbance. There were no holts or lying up places found on the surveyed stretch of the
adjacent burn or loch shores. 
Otters are not regarded as an issue for development of the Site, although a pre-start
check is recommended and a visual buffer between the adjacent burn and the west end
of the Site. 
The Site presents opportunity for a few bird species to nest although the number of
nesting pairs of any given species would be low given the size of the Site. If landscaping
provides some nesting opportunity in due course, and any vegetation removal either
avoids the nesting season or ensures that nesting birds are protected until nesting is
finished, breeding birds are not an issue in relation to any significant impact on local,
regional or national populations. 
While areas of Loch Etive are regarded as sensitive or notable for biodiversity reasons,
including waders and breeding seabirds, the area around Connel has no designations or
points of interest as noted on the Loch Etive Integrated Coastal Zone Management Plan.  
Birds that are known to use the Loch are less likely at or around the Site either for feeding
or nesting due to various factors mainly proximity disturbance and lack of suitable shore
habitat”. 
The report set out a number of recommendations for development of the site as follows. 
1. “Pre-start otter check to ensure that no holts or resting places have established within
licensable distance since the original survey.
2. Undertake vegetation clearance between October and February if possible. If
vegetation removal cannot be completed by the end of February, bird nest checks will
be needed from March to August. If a nest is found, or a bird building a nest, then this
area will need to be avoided until the nest or nests are no longer. Avoidance distance
would depend on species and location.
3. Design in bird nesting features around the Site whether on buildings or in landscaping,
and consider a visual buffer (shrub, tree etc) to the west end to buffer the burn (otter
passage).
4. All construction and operational lighting to be directed into the site, away from
adjacent habitats, and at as low-level spill and intensity as possible.
5. All landscaping should use native species or ornamentals that have a positive
biodiversity influence i.e. they are nectar, pollen or berry bearing as far as possible”. 
In her response to the Transtech report, the BDO noted the content of the report including
taking account of seasonality concerning ornithological interest along with advice and
mitigation for Otter and Bat species. The BDO concurred with the recommendations to
protect and enhance habitats and species such pre-start checks for bird species, the
provision of bat boxes and landscaping with native trees and shrubs. The BDO advised
that, if permission is granted, planting of Ash- Fraxinus excelsior should be avoided due
to Ash Die Back being present in the area and the difficulty in purchasing this species. 
The BDO noted that Japanese Knotweed is evident and accordingly requests that a
watching brief is undertaken for the site. 
In response to the JDC Ecology report, the BDO noted the contents, advising that the
survey was carried out on 1st December, outwith the optimum time of year, whereas the
original ecological report surveys were carried out over a 4 day period in early July.  The
BDO noted that the conclusions of the report are not unexpected and the
recommendations follow best practice including additional advice on the contribution
Page 44

Page 45

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
landscape planning (both planting and bird boxes) and implementation can make to
provide habitat for a variety of species.   
The BDO recommended that both ecological reports (July and January) are implemented
in combination should planning permission be granted. 
In the event that planning permission were to be granted, adequate and
proportionate measures for biodiversity enhancement and protection could be
delivered by planning condition as could compliance with the recommendations
and mitigation measures set out in both Otter and Bird Surveys, rendering the
proposal compliant with NPF4 Policy 3 as underpinned by LDP Policy LDP 3 and
SG LDP ENV 1 and Policy 73 of pLDP2. 
5.4. NPF4 Policy 4 – Natural Places 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use of
nature-based solutions. 
The proposed development is not within any designated European site of natural
environment conservation or protection, it is not located within a National Park, a National
Scenic Area a SSSI or RAMSAR site, or a National Nature Reserve. Neither is it located
within a local landscape area or a site designated as a local nature conservation site or
within an area identified as wild land.   
However, whilst the site is not within any of the aforementioned designations, it is
designated within both the adopted and emerging LDP as an OSPA and therefore it is
considered to have important landscape value which requires to be considered under
NPF4 Policy 4.   
The OSPA is detailed as providing visual amenity functions by helping preserve the open
aspect on the seaward side of the A85 and with it, public views across Loch Etive.  The
OSPA forms part of the wider network of OSPAs alongside Loch Etive that, together,
provide the wider function of preserving the undeveloped aspect of the shore side of the
road.  Development within this OSPA with the proposal subject of this planning application
would represent the piecemeal erosion of the wider OSPA network and would potentially
lead to pressure for development within other designated OSPAs either side of Loch
Etive, thereby undermining their functions. 
The development the subject of this application would introduce built development and
infrastructure into the OSPA which it is considered would erode the open aspect of the
site and the associated views across it. 
The OSPA is discussed in more detail at NPF4 Policy 9 below. 
The proposed development is considered to be contrary to the provisions of NPF4
Policy 4 as underpinned by LDP Policy 3. 
5.5. NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield, vacant
and derelict land and empty buildings, and to help reduce the need for greenfield
development. 
Page 45

Page 46

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Part (b) of Policy 9 states that proposals on greenfield sites will not be supported unless
the site has been allocated for development or the proposal is explicitly supported by
policies in the LDP. 
The site the subject of this planning application is on a greenfield site designated in the
LDP as an OSPA and accordingly there is a direct conflict between the proposed
development and NPF4 Policy 9. 
In order to inform in the assessment of the proposal, comments were sought from the
Council’s DPT who advised that in terms of the adopted LDP Proposals Maps the site is
situated within an OSPA  which provides visual amenity functions by helping preserve the
open aspect on the seaward side of the A85 and with it, public views across Loch Etive. 
The DPT advise that Policy SG LDP REC/COM 2 sets out that the development of OSPAs
will not be permitted except where one of the five clauses set out in the policy are met, as
follows. 
(i) The proposed development is ancillary to the principal use of the site as a playing
field; Or; 
(ii) The proposed development involves a minor part of the playing field which would
not affect its use and potential for sport and training; Or, 
(iii) The playing field which would be lost would be replaced by a new playing field of
comparable or greater benefit for sport and in a location which is convenient for its
users, or by the upgrading of an existing playing field to provide a better quality
facility either within the same site or at another location which is convenient for its
users and which maintains or improves the overall playing capacity in the area; Or, 
(iv) A playing field and pitches strategy, prepared in consultation with SportScotland,
has demonstrated that there is a clear excess of sports pitches to meet current and
anticipated future demand in the area, and that the site could be developed without
detriment to the overall quality of provision; Or 
(v) In the case of valued recreational areas (public or private) it can be adequately
demonstrated that there would be no loss of amenity through either partial, or
complete development and that an alternative provision of equal benefit and
accessibility be made available. 
The DPT advised that they do not consider that the proposal satisfies any of the five
clauses and as such the proposal is considered to be contrary to Policy SG LDP REC/COM
2.  The DPT further stated that the OSPA designation has been carried forward into pLDP2
and has not been objected to. 
In light of the comments from the DPT, the Agent submitted a report on the OSPA in order
to demonstrate that the amenity value of the OSPA will not be affected by the proposed
development.  The report considers the statement provided by the DPT “This OSPA
provides visual amenity functions by helping preserve the open aspect on the seaward
side of the A85 and with it, views across Loch Etive”. 
The report considers the existing recreational use and visual amenity of the site and the
impact that the proposed development will have on the OSPA. 
In summary, the report concludes that the proposal will not impact on the visual amenity
value of the site in its role in ...helping preserve the open aspect on the seaward side of
the A85 and with it, views across Loch Etive.   
The report details that the application proposes the cafe building within the eastern part of
the site, adjacent to existing buildings to the west. The proposed cafe will be viewed in the
Page 46

Page 47

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
context of these existing buildings, and will not further impede views across the Loch more
than the existing condition. This is applicable in views both from the east and west along
the A85. Therefore, the report contends that the proposal does not impact on the visual
amenity of the site. 
The report states that the site is currently in agricultural use and not formally used as open
space. It is not open to the public and any use of the site for recreation is on an informal
basis. The proposal will provide a play area, viewing area and landscaped open space.
This will open the site to public use bringing an improvement in terms of formal open space
provision to the shoreline in the east of Connel. 
The report further states that the proposal also represents sustainable economic growth
that will provide four full-time jobs and three part-time jobs which will opportunities for local
residents which outweigh the site’s designation as an OSPA. 
The report concludes by stating that development of the site provides the opportunity to
provide a betterment to the existing condition in relation to the provision and protection of
open space and therefore accords with Policy SG LDP REC/COM 2. 
In their response to the report submitted by the Agent in regards to the OSPA, the DPT
advised that the additional submission assesses the proposal against clause ‘v’ of SG LDP
REC/COM 2 which relates to “valued recreational areas” and contends that it complies
with the clause and therefore the Policy.  However, the DPT advise that given that that the
land is considered to provide visual amenity functions rather than recreation functions, it
is considered that the proposal remains contrary to SG LDP REC/COM 2 as it does not
satisfy any of the 5 clauses. 
The DPT provided the following comments on the matters raised in the additional
information submitted by the agent as follows. 
“Improvements to public open space access and recreation
The development would potentially allow easier public access to the location of the
proposed view point area and interpretation panel than could currently be achieved.
However this area would still need to be accessed through the parking area and private
business curtilage of the café premises (and for those on foot, a potential crossing of the
A85 trunk road). Being set in close proximity to the café it needs to be considered to what
level the view point area would more function to serve the users of the premises rather
than the wider general public. It is also not clear what mechanisms are proposed to ensure
that the view point remains available for public use in perpetuity. There is also an existing
alternative viewpoint area situated within Connel to the west of the Connel Bridge and as
such the additional value of the proposal here should be considered. 
In terms of play space, the proposal would add to that provided by the existing facility at
Powell Place. However, from the information submitted it is not clear how many pieces of
equipment the proposed area would be able to accommodate once all siting requirements
for each piece had been met and as such how much it would add to the existing provision.
In assessing what weight this provision can be afforded it should also be considered to
what level the equipment would serve the customers of the café rather than the needs of
the local population. There is the potential for the equipment to reach capacity from café
customers during busier periods of operation. It should also be considered that access by
the local population would require users to cross the A85 trunk road. As with the view
point, it is not clear how the facility would remain available in perpetuity for the use by the
general public given that it would remain under the control of a private business (that
potentially could be owned by different proprietors over its lifetime). 
Page 47

Page 48

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Visual amenity
The sensitivity of the site can be seen through the outcome of 2009 Local Plan Enquiry
where the designation of the OSPA on the adjacent land to the west (and along with it, the
wider OSPA relating to coast side land at Connel) was confirmed by the Reporter. The
Reporter noted that due to its proximity to the Connel Bridge the Local Plan objection site
was one of the most valuable points where the A85 runs close to the water’s edge. Given
the proximity and similar characteristics, similar conclusions can be drawn regarding the
adjacent site subject to 21/01583/PP. 
The additional information submitted mostly assesses the impact of the café building itself
however the overall development of the site should be taken into account, this includes
the provision of a car park and turning area for up to 18 cars with what are significant areas
of hardstanding. Taken as a whole the proposal would erode the open aspect of the site
and the associated [public] views across it as these would be seen in the context of the
overall built development. 
The OSPA in this particular location helps preserve the open aspect of the land on the
shore side of the road and along with it the [public] views, however it must also be
recognised that it forms part of the wider network of OSPAs alongside Loch Etive that
together provide the wider function of preserving the undeveloped aspect of the shore side
of the road and the development of the OSPA would represent a piecemeal erosion of this.
It would also potentially lead to pressure for development within other designated Open
Space Protection Areas on either side of Loch Etive and potentially undermine their
functions. 
Economic benefits
The additional information provided also contends the economic benefit of four full time
and three part time jobs and whilst this would provide a benefit to the local economy this,
alongside the other justifications, need to be considered against the concerns set out
above”. 
Whilst the potential economic benefit arising from the proposed development is noted, it
is not considered that this is sufficient to set aside the detrimental impact that the proposed
development will have on the OSPA. 
The development the subject of this application would introduce built development
and infrastructure into a greenfield site which has been designated as an OSPA for
its visual amenity functions contrary to the provisions of NPF4 Policy 9 as
underpinned by LDP Policies 8 and SG LDP REC/COM 2 and Policy 81 of pLDP2. 
5.6. NPF4 Policy 12 – Zero Waste 
NPF4 Policy 12 seeks to encourage, promote and facilitate development that is consistent
with the waste hierarchy as defined within the policy document. 
The proposed development would generate waste when operational. Whilst the proposal
makes provision for three commercial refuse bins at the site, should permission be
granted, it would be considered appropriate to impose a condition to secure the details of
the proposed waste management at the site during the operational phase so as to accord
with the principles of sustainable waste management. 
In the event that planning permission was to be granted, a Waste Management
Statement for the proposed development could be secured by planning condition
rendering the proposal compliant with NPF4 Policy 12 as underpinned by LDP
Page 48

Page 49

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Policies LDP 10 and SG LDP SERV 5 and 5(b) and Policy 63 of pLDP2 should
permission be granted.   
5.7. NPF4 Policy 13 – Sustainable Transport 
NPF4 13 seeks to encourage, promote and facilitate developments that prioritise walking,
wheeling, cycling and public transport for everyday travel and reduce the need to travel
unsustainably. 
The development the subject of this planning application seeks to secure permission for
a café with drive through facility.  An existing agricultural access at the junction with the
A85 Trunk Road is to be upgraded to serve the proposed development.  This small scale
development is not considered to be a significant travel generating use or a proposal
where it is considered important to monitor travel patterns resulting from the development. 
In their first submission in November 2021, Transport Scotland (TS) deferred their
decision due to insufficient information to allow them to provide a detailed response to the
consultation.  As a result of the comments from TS ongoing discussions took place
between the Agent and TS to agree a suitable access regime to serve the proposed
development.  In January 2023 TS provided a finalised consultation response for the
proposed development raising no objection subject to conditions being imposed on the
grant of permission to secure the construction of the access and clearance of the visibility
splays at the junction with the A85 in accordance with the finalised scheme agreed
between the Agent and the TS. 
It should be noted, that during the processing of the application the Agent was advised
that the proposal conflicted with LDP Policy regarding development within an OSPA and
that the Planning Authority were unable to support the proposed development, details of
which are provided below.  However, the Agent sought the application to be held to allow
the access issues to be resolved, a request which was agreed with the Planning Authority. 
The Agent submitted a statement addressing the requirements of NPF4 Policy 13 as
follows. 
“Policy 13 criterion a) is not relevant to the proposed use of the site. Policy 13 criteria c),
d), e) and f) are also not considered relevant as the proposal as it is not a significant travel
generating use, nor is it promoting a low/no parking approach. 
“The proposal site is located adjacent to the existing pavement and carriageway (A85).
Access to the site via walking, wheeling and cycling can be achieved via the existing road
and footpath network. 
The site is accessible by public transport. The proposal is located within approximately
350m walking distance of the bus stops on Main Street, 450m walking distance of Connel
Ferry Railway Station, and 750m of the bus stops on the A85 in the west of Connel. The
site therefore has good access to the local public transport network. 
The proposal includes parking for disabled drivers and has non-slip surface finishes to
the café entrance and to the viewpoint and playpark, ensuring that the needs of diverse
groups using the site are met. 
It is therefore considered that the proposal accords with NPF 4 Policy 13 b) as far as is
necessary for the nature and scale of the proposed use. 
Page 49

Page 50

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The proposal site is located adjacent to the existing pavement and carriageway (A85).
Public access to the site will be via the existing footway and vehicular junction from the
A85. The A85 is a trunk road. Transport Scotland has been consulted as part of the
Application and have raised no objections to the proposed junction”. 
In the event that planning permission was to be granted, a suitable access regime
and parking and turning area to serve the proposed development could be secured
by planning condition rendering the proposal compliant with NPF4 Policy 13 as
underpinned by LDP Policies LDP 11, SG LDP TRAN 2, SG LDP TRAN 4 and SG
LDP TRAN 6 and Policies 35, 36, 39 and 40. 
5.8. NPF4 Policy 14 – Design, Quality and Place 
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed development
that makes successful places by taking a design-led approach and applying the ‘Place
Principle’. 
The design and finishing materials of the proposed café is considered to be acceptable,
relating to the development within the surrounding area where there is a wide variety of
design and finishing materials with no distinct architectural style evident. 
The application is accompanied by a statement addressing the six qualities of successful
places set out in NPF4 Policy 14 as follows. 
“Healthy: Supporting the prioritisation of women’s safety and improving physical and
mental health. Pleasant: Supporting attractive natural and built spaces. Connected:
Supporting well connected networks that make moving around easy and reduce car
dependency.  Distinctive: Supporting attention to detail of local architectural styles and
natural landscapes to be interpreted, literally or creatively, into designs to reinforce
identity. Sustainable: Supporting the efficient use of resources that will allow people to
live, play, work and stay in their area, ensuring climate resilience, and integrating nature
positive, biodiversity solutions. Adaptable: Supporting commitment to investing in the
long-term value of buildings, streets and spaces by allowing for flexibility so that they can
be changed quickly to accommodate different uses as well as maintained over time”. 
In this regard, the development the subject of this planning application is
considered to be in accordance with the broad aims of NPF4 Policy 14 as
underpinned by LDP Policies LDP 9 and SG LDP Sustainable Siting and Design
Principles and Policies 5, 9 and 10 of pLDP2. 
5.9. NPF4 Policy 18 – Infrastructure First 
NPF4 18 seeks to encourage, promote and facilitate an infrastructure first approach to
land use planning, which puts infrastructure considerations at the heart of placemaking. 
The development the subject of this planning application proposes connection to the
public water supply with drainage via installation of a private system due to the lack of
public drainage infrastructure within the vicinity of the site.  In their response to the
application Scottish Water raised no objection to the proposed development which would
be serviced by the Tullich Water Treatment Works but did however advise that further
investigations may be required once a formal application for connection is submitted to
them for consideration. 
The proposal aligns with NPF4 Policy 18 as underpinned by LDP Policy LDP DM 11
and SG LDP SERV 1 and Policies 05, 08 and 60 of pLDP2 which seek to ensure
Page 50

Page 51

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
suitable infrastructure is available to serve proposed developments and the current
proposal would raise no issue of conflict should permission be granted. 
5.10. NPF4 Policy 22 – Flood Risk and Water Management 
NPF4 Policy 22 seeks to strengthen resilience to flood risk and to ensure that water
resources are used efficiently and sustainably. 
As detailed above the development proposes connection to the public water supply to
which Scottish Water has not objected to.  With regards to the management of rain and
surface water at the site, this could be controlled thorough a condition to secure a suitable
sustainable drainage system for the site should permission be granted.   
The proposal aligns NPF4 Policy 22 as underpinned by LDP Policies LDP 10 and
SG LDP SERV 2 and Policy 61 of pLDP2 and the current proposal would raise no
issue of conflict should permission be granted. 
5.11. NPF4 Policy 23 – Health and Safety 
NPF4 Policy 23 seeks to protect people and places from environmental harm, mitigate
risks arising from safety hazards and encourage, promote and facilitate development that
improves health and wellbeing. 
Part (e) of Policy 30 states that development proposals that are likely to raise
unacceptable noise issues will not be supported with a requirement for a Noise Impact
Assessment where the nature of the proposal or its location suggests that significant
effects are likely. 
Accordingly, as the application site is in close proximity to a residential dwellinghouse, in
order to inform in the assessment of the application, a consultation was undertaken with
the Council’s EHS. 
In their response the EHS noted that the site layout show areas where pedestrians and
vehicles could come into conflict and requested a site traffic management plan with details
on engineering controls to prevent pedestrian and vehicle conflict or a redesign of the site
layout to address pedestrian and vehicle conflict.  The EHS further noted that commercial
catering premises of this nature require the installation of external extraction from their
kitchens to assist with removal and treatment of kitchen fumes and hot air.  Accordingly,
in terms of amenity of the area, the EHS advised that a noise limiting condition should be
imposed on any permission granted which would cover noise from the aforementioned
extraction systems and limit the impact which these would have on neighbouring noise
sensitive premises.  Finally, the EHS advised that a condition should be imposed on the
grant of permission regarding any proposed external lighting to ensure no adverse impact
on the amenity of the area. 
Subject to conditions to secure the requirements of the EHS, the current proposal
would raise no issue of conflict with NPF4 Policy 23 as underpinned by LDP Policy
SG LDP BAD 1 and pLDP2 Policy 14 should permission be granted. 
5.12. NPF4 Policy 28 – Retail 
NPF4 Policy 28 seeks to encourage, promote and facilitate retail investment to the most
sustainable locations that are most accessible by a range of sustainable transport modes. 
Page 51

Page 52

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Policy 28(d) gives support to retail uses within rural areas where their use is ancillary to
other uses; serve local needs; has no impact on nearby town centres; provide a service
throughout the year; and has no adverse impact on traffic generation and parking
provision.  In this regard, the site, being a rural extension of the defined settlement,
benefits from support under Policy 28(d) representing an appropriate form of ancillary
retail use serving the village of Connel. 
The proposal aligns NPF4 Policy 28  as underpinned by LDP Policies LDP 7 and SG
LDP RET 3 and Policy 46 of pLDP2 and the current proposal would raise no issue
of conflict should permission be granted. 
5.13. NPF4 Policy 29 – Rural Development 
NPF4 Policy 29 seeks to encourage rural economic activity, innovation and diversification
whilst ensuring that the distinctive character of the rural area and the service function of
small towns, natural assets and cultural heritage are safeguarded and enhanced. 
Part (a) of Policy 29 supports development proposals that contribute to the viability,
sustainability and diversity of rural communities and local rural economy with Part (b)
requiring development proposals in rural areas to be suitably scaled, sited and designed
to be in keeping with the character of the area taking into consideration how the
development will contribute towards local living and taking into account the transport
needs of the development as appropriate for the rural location.  Part (c) affords support
to development proposals in rural areas where they will (i) support local employment; (ii)
support and sustains existing communities and (iii) is suitable in terms of location, access,
siting, design and environmental impact. 
The SS submitted with the application details that the proposal will provide four full-time
jobs and three part-time jobs which it is hoped will be for local residents.  The proposed
development includes a viewpoint with an interpretative sign providing information about
the history of Connel and Loch Etive. The proposal also includes a playpark for use by
patrons of the proposed café and also locals. 
Whilst it has been demonstrated that the proposed development, through consideration
of the Policies detailed above, that the development is of a suitable scale and design,
taking account of transport needs, and providing some economic benefit, it is not
considered that these aspects of the proposed development would outweigh the negative
landscape impact that would arise from the proposed development within the designated
OSPA, which is discussed in more detail above. 
The proposal conflicts with NPF4 Policy 29 as underpinned by LDP Policy LDP 5
and Policy 22 of pLDP2.   
6. Public Representation 
6.1. At the time of report, representations have been received by the Planning Authority from
165 respondents in relation to this planning application. 44 respondents raise objection,
120 provide support and 1 submits a representation. 
Of the 120 expressions of support, 66 of these were submitted to the Applicant during a
Community Council Meeting held on 09/05/22 and then passed to the Planning Authority.   
In addition to the above, a screenshot from Facebook with names and ‘likes’ for the
development on the Applicant’s personal Facebook page has been submitted. 
Page 52

Page 53

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The names and addresses of those contributing to the application are contained within
Appendix B of this report with full copies of the representations published on the planning
application file available to view via the Public Access section of the Council’s website. 
As detailed above, NPF4 Policy 9(b) states that proposals on greenfield sites will not be
supported unless the site has been allocated for development or the proposal is explicitly
supported in the LDP.   
The site has been designated as an OSPA in the adopted LDP and emerging pLDP2
where Policies SG LDP REC/COM 2 and Policy 81, respectively, do not permit
development on OSPAs except in the specific circumstances detailed above. 
The proposed development within the OSPA conflicts with both National and Local Policy
and therefore, in this instance, the proposal represents a clear policy refusal and it is not
considered that a hearing would add anything to the planning process. 
7. Conclusion 
7.1. Notwithstanding the assessment above that the design and finishes of the proposed café
building is acceptable, and that suitable access and infrastructure could be provided to
serve the proposed development, there is a clear conflict with NPF4 Policy 9 as
underpinned by LDP Policies LDP 9 and SG LDP REC/COM 2 and Policy 81 of pLDP2
which seek to protect OSPAs from built development. 
As detailed above, the OSPA in this location helps preserve the open aspect of the land
on the shore side of the road and along with it the public views.  It should be recognised
that the OSPA forms part of the wider network of OSPAs alongside Loch Etive that,
together, provide the wider function of preserving the undeveloped aspect of the shore
side of the road.  Development within this OSPA with the proposal subject of this planning
application would represent the piecemeal erosion of the wider OSPA network and would
potentially lead to pressure for development within other designated OSPAs either side
of Loch Etive, thereby undermining their functions. 
The development the subject of this application would introduce built development and
infrastructure into a greenfield site which has been designated as an OSPA for its visual
amenity functions as detailed above. 
The proposed development would result in an adverse environmental impact eroding the
open aspect of the site and the associated public views across it thereby undermining the
OSPA designation of the site. 
Whilst the potential economic benefit arising from the proposed development is noted, it
is not considered that this is sufficient to set aside the detrimental impact that the
proposed development will have on the have on the open landscape character of the area
and the primary function of the OSPA to protect this together with important public views
of Loch Etive which give the settlement of Connel much of its unique character.   
In light of the above it is recommended that planning permission be refused. 
Page 53

Page 54

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
COMMITTEE REPORT
APPENDIX B – RELATIVE TO APPLICATION NUMBER:  21/01583/PP 
LIST OF CONTRIBUTORS 
OBJECTION 
Contributor Name  Contributor Address  Date
Received 
Planning Objections Scotland 
(on behalf of Pat and Cheryl
Howe)
By e-mail only  10/07/23
Mykhailo Andreiev Inverlusragan, Connel, PA37 1PG 29/06/22 
Tetiana Andreieva Inverlusragan, Connel, PA37 1PG 29/06/22
John Hamilton  Glen Cole, Connel, PA37 1SS 29/06/22
M.R. Cooper Conbrio, Feochan Gardens, Oban, PA34 4NJ 29/06/22
Dr Paul Yoxon IOSF, 7 Black Park, Isle of Skye, IV49 9DE 15/06/22
Julian Hedditch 2 Cook Avenue, Chard, Somerset, TA20 2JR  04/06/22
Dr Allison Davies  Craignaha, Connel, PA37 1PH 04/06/22
Mr Andrew Davies Craignaha, Connel, PA37 1PH  04/06/22 
Mr Dylan Howe Inverlusragan, Connel, PA37 1PG 02/06/22
Ann MacKenzie  1 Grosvenor Crescent, Connel, PA37 1PQ  01/06/22
Miss H.A. Steele  By e-mail only  01/06/22
Mr Andrew Davies  Craignaha, Connel, PA37 1PH  
Neil Stuart  Achaleven House, Connel, PA37 1PF 01/06/22
Mr David Williams  Allt na Craobh, Connel, PA37 1PT 01/06/22
Elise Cleaver-Smith  Tyndrum Lodges  31/05/22
Graham Irving  Loch na Beithe Cottage, North Connel 31/05/22
Andrew Crabb 7 Dalnabeich, North Connel, PA37 1QY  31/05/22 
Miss Sheila Cawthera Loch na Beithe Cottage, North Connel, PA37
1QX 
31/05/22
Mrs Janet B. Finlayson Etive Cottage, Connel 30/05/22
Mary Buchanan  Strathaird, Connel, PA37 1PH 28/05/22
Mr Derek Wilkinson  Lora House Upper, Connel, PA37 1PA 29/05/22
Mrs Gillian Cowan  Ards Cottage, Connel, PA37 1PT  28/05/22
Chris Hill  Barnstone, Great Street, Norton sub Hamdon,
Somerset, TA14 6SJ
27/05/22
Lynn Ashforth  By e-mail only  26/05/22
Mr William Cowan Ards Cottage, Connel, PA37 1PT 26/05/22
Helen Anderson  Ard Beag, Connel, PA37 1PT  25/05/22
John Anderson  Ard Beag, Connel, PA37 1PT  25/05/22
James Stewart  Dunavon, Connel, PA37 1PJ 25/05/22
Wendy Barbour  19 Barossa Place, Perth, PH1 5HH 25/05/22
Katy Buchanan 12 Etive Park, North Connel, PA37 1SJ 25/05/22
David Gates   21 Titchfield Grange, Fareham, Hants, PO15
5AR 
23/05/22
Eric Barbour  45 Taylor Drive, Bramley, Hamphsire, R$G26
5XB 
22/05/22
Lynda Carlin 15 Creag Bhan Village, Oban, PA34 4BF  22/05/22
Fiona Woodhouse Achacha, Barcaldine, PA37 1SF 22/05/22
Marie Geekie  115 Byng Drive, Potters Bar, Herts, EN6 1UJ 22/05/22
Page 54

Page 55

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Rowan Howe Inverlusragan, Connel, PA37 1PG 23/05/22
Tom Howe  Inverlusragan, Connel, PA37 1PG 20/05/22
Anna-Maria Darzeva 2/2, 16 White Street, Glasgow, G11 5RP 20/05/22
Clare Mattison  By e-mail only  03/02/23 
Paul Mattison  By e-mail only  03/02/23
Ann Buchanan  By e-mail only  09/12/21 
05/01/22
19/05/22
23/05/22
27/10/22
22/02/23 
Mrs Cheryl Howe  Inverlusragan, Connel, PA37 1PG 07/12/2
28/04/23
13/05/22 
16/05/22
21/02/23
Mr Pat Howe  Inverlusragan, Connel, PA37 1PG 03/12/21
01/04/22
28/04/22
05/05/22
13/05/22
16/05/22
02/06/22
27/09/22
13/11/22 
21/02/23 
SUPPORT 
Contributor Name  Contributor Address  Date
Received 
Mrs Susan Baillie  The Neuk, Connel, PA37 1PJ 02/06/22
Barbara Macfarlane  Caerthann House, Grosvenor Crescent, Connel, PA37
1PQ
20/05/22
Dr Garret
Macfarlane 
Caerthann House, Grosvenor Crescent, Connel, PA37
1PQ 
20/05/22
Duncan Baird  Leven House, Achaleven, Connel, PA37 1PE  11/05/22
Ian MacVicar  Fasgadh, North Connel, PA37 1RA  21/04/23 
Christine Hill Mo Dhachaidh, Connel, PA37 1QP  21/04/23 
Steven Hill Mo Dhachaidh, Connel, PA37 1PO 21/04/23 
Daniel MacVicar  8 Park Road, Oban 21/04/23
Matt Kelly Catalina, Oban  21/04/23 
Sara Stephenson  Carnoch, Connel, PA37 1PH 21/04/23 
Lesley Stone  Eilean Froaich, North Connel, PA37 1QX 21/04/23 
John Stone  Eilean Froaich, North Connel, PA37 1QX 21/04/23
Shona MacVicar  Oaklea, Ledaig, PA37 1RX  21/04/23 
Graeme MacVicar Oaklea, Ledaig, PA37 1RX  21/04/23 
Isla Robertson  Old Burnside Flat, Main Street, Connel, PA37 1PA  21/04/23 
Lorne Sinclair Old Burnside Flat, Main Street, Connel, PA37 1PA 21/04/23
Yvonne Clark  Lailt, Connel, PA37 1PF 21/04/23 
Allan MacKay 15 Kerrera Terrace, Oban, PA34 5AT  21/04/23 
Page 55

Page 56

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Claire MacKay  15 Kerrera Terrace, Oban, PA34 5AT  21/04/22
Vivien Smith  15 Kerrera Terrace, Oban, PA34 5AT  21/04/22
Clare Hampson  49 Achlonan, Taynuilt, PA35 1JJ 21/04/22 
Janine Johnson Bruach, Taynuilt, PA35 1HX 21/04/22
Karina MacPherson  19 Camus Road, Dunbeg, PA37 1QD 21/04/22
Gemma Campbell  12 Cruachan Cottages, Taynuilt, PA35 1JG 21/04/22
Katie Smith Glenview, Kilvaree, Connel, PA37 1QN  21/04/22
Connor Kerr Carnoch, Connel, PA37 1PH 21/04/22
Daniel MacIntyre 179 Lightburn Road, Cambuslang, G72 8XW  21/04/22
Robert H. Smith  24 Creag Bhan Village, Oban, PA34 4BF 21/04/22
Georgia Mitchell Balnakeil, Kirk Road, Dunbeg, PA32 1PP 21/04/22
Veronica Speirs,  Corran Brae, Oban, PA34 5AJ 21/04/22
Lucy Stewart  17c Corran Brae, Oban, PA34 5AH 21/04/22
Nadia Holenadl  Flat 3, 10 Stevenson Street, Oban, PA34 5NA 21/04/22
Scott Sinclair  6 Ferryfield Road, Connel 21/04/22
Calum MacLachlain Morven House, Oban 21/04/22
Kenneth Ferguson Morar House, Connel, PA37 1PA 21/04/22
George McKnight  No address  21/04/22
Cloudie Forsyth  White Lodge, Glencruitten Road, Oban, PA34 4EW  21/04/22
Owner/Occupier
(unreadable) 
13d Corran Brae, Oban PA34 5AJ  21/04/22
Lee Gallacher 10b Corran Brae, Oban 21/04/22
Marie-Louise Korke 5a Burnbank Terrace, Breadalbane Street, Oban,
PA34 5PB
21/04/22
Gavin MacKinnon 120 George Street, Oban, PA34 5NT  21/04/22 
Kimberly Bryce  6 Ferryfield Road, Connel 21/04/22
Shona Vajk  14 Achaleven Road, Connel, PA37 1PE  21/04/22
Elaine Smith, Keppoch, Croft Road, Oban, PA34 5JN 21/04/22
Eilidh Johnston Seilachveaich, Oban, PA34 4JG 21/04/22
Jamie Warnock 61 MacKelvie Road, Oban 21/04/22 
Andrew MacMillan 10 Benmore View, North Connel, PA37 1SN 21/04/22
Ann Campbell Andarach, Connel, PA37 1PQ  21/04/22 
Archie Campbell  Andarach, Connel, PA37 1PQ  21/04/22
Fiona Ferguson  Morar House, Connel, PA37 1DA  21/04/22 
Graham Campbell  12a Glencruitten Drive, Oban, PA34 4EP 21/04/22
David Cameron  11b Longsdale Terrace, Oban  21/04/22 
Blair MacFarlane  Darach Lodge, Inverawe  21/04/22 
Helen MacVicar  Oaklea, Ledaig, PA34 1RX  21/04/22 
In addition to the above, details of support submitted during a Community Council Meeting on
09/05/22 containing 76 signatures has also been submitted as follows.  Those shown in bold
have provide separate support as detailed above. 
Contributor Name  Contributor Address 
Scott Sinclair  6 Ferryfield Road, Connel 
Caitlen Fowler  Rockfield Road, Oban 
Paul Addison  15/7 Sloan Street, Edinburgh, EH6 8PL
G. MacFarlane Darach Lodge, Inverawe 
C. MacFarlane  Beachglade, Soroba, Oban 
Duncan Baird Leven House, Connel, PA37 1PE 
Ally Dickie Meadow View, Kilmore, PA34 4XX 
Matthew Kelly 2 Stranraer Road, Oban 
Page 56

Page 57

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Lauren Stewart  Innishail, Bridge of Awe 
Colin MacCallum 2 Stranraer Road, Oban 
Lucy Stewart  Keepers Cottage, Benderloch, PA37 1WS 
Hamish Buchanan Cregan, Benderloch 
Karen Baird  Leven House, Achaleven, Connel 
Connor Kerr  Carnoch, Connel, PA37 1PH 
Gayle Dickie  Meadow View, Kilmore, PA34 4XX
A. Silvester Flat, Greenacre, Connel 
Laura Carmichael  42 Morvern Hill, Oban, PA34 4NS 
Hazel Silvester  2 Greenacre, Connel
Helen Campbell  9 Castle Road, Dunbeg, PA37 1QH 
Peter MacGregor  Knysna, Glenshellach Road, Oban 
Robert MacPherson Riverside Lodge, Barcaldine 
Nico Minco  The Caravan, Achaleven, Connel 
Donald MacLean Riverdale, Connel 
Sarah Sinclair  Abernethys, Connel, PA37 1RN 
Lucy Plummer  Burnside, Connel 
Iona Sinclair  Abernethys, Connel, PA37 1RN 
C. Munro  Ferndene, North Connel, PA37 1RA 
Neil Carmichael  42 Morvern Hill, Oban, PA34 4NS 
William (Illegible)  39 Marine Court 
Isla Robertson  Old Burnside Flat, Connel, PA37 1PA
Allan Wright 3 Deirdre, Connel 
Alice Addison  Macvicar Court, Dunbeg, PA37 1AA
Chris Shotton 15/7 Sloan Street, Edinburgh 
Mairi Wright  2 Deirdre, Connel, PA37 1PL
Wendy Addison  10 Lunga Road, Oban, PA34 4NP 
Sara Stephenson Carnoch, Connel, Oban, PA37 1PH 
Shaun Abernethys, Connel 
John Campbell  9 Castle Road, Dunbeg, PA37 1QH 
Veronica Speirs  17c Corran Brae, Oban, PA34 5AJ
Jack Harper  Connel
Anna-May Woodhouse  Culnadalloch Bungalow, Achnacloich Farm, Connel, PA37 1PR 
Paul Ferguson 16 Achaleven 
Fiona Ferguson Morar House, Connel, PA37 1PA
Chrissie Thomson  6 Millpark Terrace, Oban, PA34 4JH
Jamie MacMillan Main Street, Connel 
Iain Scott  6 Grosvenor Crescent 
Ragen Kelly 2 Stranraer Road, Oban, PA34 4EU 
Kirsteen Clark 2 Stranraer Road, Oban, PA34 4EU
Kenny (Illegible) 5 Dalrigh, Oban, PA34 
F. Lockhart  The Oaks, Polvinster Road, Oban 
Jonathan MacKenzie  Achnacloich Farm, Connel, PA37 1PR 
Kathleen Anderson  Dal-Eite, Connel, PA37 1PA 
Kevin McCubbin 14 Park Road, Oban, PA34 4GZ
Jean Clark  Cuiluaine, Connel, PA37 1PF 
Sileas Sinclair Rhonelin, North Connel, PA37 1QX
Suzie Smith  1 Buchanan Terrace, Oban
Yvonne Clark Lailt, Connel 
Millie (illegible) Lailt, Connel 
K. Bryce  6 Ferryfield Road, Connel 
Janice McGhee  Allt an Sith, Achnacloich, Connel, PA37 1PR 
Georgia Mitchell 7 Balnakeil, Kirk Road, Dunbeg, PA37 1PP
Page 57

Page 58

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Jonathan Sayer  7 Balnakeil, Kirk Road, Dunbeg, PA37 1PP
Grace MacLean 10a Dalintart Drive, Oban, PA34 4EE
Amanda Hunter  Craigneuk, Benderloch, PA37 1RT 
Dr Garret MacFarlane  Caerthann House, Grosvenor Crescent, Connel, PA37 1PQ
Fiona MacFarlane  Darach Lodge, Taynuilt
Steve Hill  Mo Dhachaidh, Connel 
Christine Hill  Mo Dhachaidh, Connel 
Sarah Hill Mo Dhachaidh, Connel 
Archie Campbell  An Daroch, Connel 
Katie Sims  Dalrannoch Farm, Barcaldine 
Nigel Taylor  12 Powell Place, Connel, PA37 1AE 
Barbara MacFarlane  Caerthann House, Grosvernor Crescent, Connel, PA77
1PQ 
Lorne Campbell Sinclair  Old Burnside Flat, Main Street, Connel, PA37 1PA 
Anna McDonald  19 Creag (illegible) 
Ross Addison  MacVicar Court, Dunbeg, PA37 1AA 
In addition to the above, a screenshot from Facebook with names and ‘likes’ for the
development on the Applicant’s personal Facebook page has been submitted. 
REPRESENTATION 
Contributor Name  Contributor Address  Date
Received 
Oban and District Access
Panel 
By e-mail only  08/01/22 
Page 58

Page 59

Page 59

Page 60

This page is intentionally left blank

Page 61

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   22/02523/PP
Planning Hierarchy:  Local Application
Applicant:   Mr D Higgins
Proposal: Erection of dwellinghouse, formation of vehicular access and
associated works
Site Address: Garden Ground of Torwood House, Torwoodhill Road, Rhu,
Helensburgh, Argyll and Bute
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 2
1.0 INTRODUCTION: 
Members will recall that a Report by officers, with regard to the above proposal, was published
as part of the PPSL Committee Agenda for 21 June 2023. The officer’s recommendation at
the time of publication was that the application be refused on the basis that the public road
regime was unsuitable to accommodate the resultant intensification of traffic. At the time of
publication of that report, officer’s considered that applicant had not demonstrated to the
satisfaction of the planning authority that commensurate improvements could be implemented
as part of the development, in order to address current road access constraints as highlighted
in the consultation response from the Council’s Area Roads Engineer. Members will be aware
that the proposed development was considered by officers to be acceptable with regard to all
other material planning considerations (with the exception of the access regime.)
However, Members agreed to defer determination of this application to allow an opportunity
for the applicant to prepare and submit further details to demonstrate that there were no
constraints to the implementation of an agreed scheme of commensurate off-site road
improvements, as per the officers’ recommendation set out in a Supplementary Report No.1
(Agenda Item no. 10.) Members also noted that this would be reported back to the Committee
at a future meeting
The purpose of this report is to:
1) Advise Members that further information has been submitted by the applicant in August
2023 providing detail of proposed road improvements;  
2) Advise Members that a revised consultation response has been received by the
Council’s Area Roads Engineer on the basis of additional information submitted by the
applicant, following the June meeting of the PPSL Committee; and, 
3) Report to Members that Officers now consider that the applicant has demonstrated
that there are no known constraints to prevent the applicant/developer implementing
Page 61 Agenda Item 5

Page 62

required commensurate off-site road improvements, referred to in the original
consultation response from the Council’s Area Roads Engineer, subject to compliance
with recommended planning conditions. 
2.0 RECOMMENDATION:
That planning permission be approved subject to planning conditions as set out within this
report. 
3.0 ADDITIONAL SUPPORTING INFORMATION/DRAWINGS:
Since the June meeting of the PPSL Committee, further information has been received from
the applicant’s agent comprising the following: -
 Drawing No. 807(L)002B Revision B – (Revised) Proposed Site Plan;
 Drawing No. 807(L)004 – Proposed Location – 2 Nos. Passing Places; and,
 A covering letter confirming that “the applicant has control over the land outside the
application site as highlighted on Dwg No 807 L 004, to allow 2 no passing spaces to
be formed as per Argyll and Bute Council Roads Authority comments.” 
4.0 CONSULATIONS:
Area Roads – 29.08.2023 – On the basis of the shared point of access (refer to Section 3.0
above) there is no objection to the proposal subject to planning conditions and advisory
notes. 
5.0 ASSESSMENT
Further to deferral of formal determination at the June meeting of the PPSL Committee the
applicant has since submitted an additional plan showing the position of 2 no. passing spaces
on the northern side of Torwoodhill Road; one of which is by means of a service bay type
access layout at the junction of the proposed private driveway and the public road, and the
other being the formation of a new passing space on the northern side of the public road
located towards the middle of that section of Torwoodhiil Road between the proposed new
access and the junction with Upper Torwoodhill Road.
The applicant has also confirmed that the applicant has control over the land outwith the
application site required for these off-site road improvements as shown on the above drawing. 
The Area Roads Engineer has re-assessed this proposal on the basis of the additional
information submitted and issued a revised consultation on this basis to the effect that the
proposed off-site road improvements (provision of two passing spaces) will address previous
concerns regarding the design capacity of the public road to accommodate the intensification
of traffic resulting from the proposed new house. Notwithstanding, the above drawing no.
807(L)004, it is recommended that further details of the detailed design layout of the 2 no.
passing spaces be submitted to, and approved in writing, by the planning authority in
consultation with the Roads Authority to ensure that these proposed improvements comply
with design standards.
Page 62

Page 63

On this basis, officers are satisfied that the applicant has the necessary control to implement
the off-site road improvements. This can be secured by means of a suspensive condition.
The provision of off-site road improvements commensurate with the scale and nature of the
proposed development complies with the provisions of Policy LDP 11 and SG LDP TRAN 5.
It is considered that the application proposal is in accordance with all relevant provisions of
the Development Plan and will not give rise to any other planning matters that would warrant
a departure from these procedures. 
6.0 RECOMMENDATION 
1) Planning Permission be approved subject to planning conditions as set out within this
report. 
Author of Report: Norman Shewan      Date: 07.09.2023
Reviewing Officer:  Peter Bain    Date: 07.09.2023 
Fergus Murray 
Head of Development and Economic Growth 
Page 63

Page 64

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 22/02523/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction  
Additional Conditions  
1.   PP - Approved Details & Standard Notes 
The development shall be implemented in accordance with the details specified on the
application form dated 12th December 2022, supporting information and, the approved
drawings listed in the table below unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64 of the
Town and Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No.  Version  Date Received 
Location Plan  807(L)000A - 25.01.2023 
Existing Site Plan 807(L)002A - 25.01.2023
Proposed Site Plan  807(L)002 Rev. B 09.08.2023 
Proposed Plans,
Sections
and Elevations
807(L)003A - 25.01.2023
Tree Survey Plan 2016_015/01 - 13.12.2022
Location Plan with
Passing Places
807(L)004    
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. No development in relation to the construction of the dwellinghouse, hereby approved,
shall commence until such time as the two passing places identified in drawing no
807(L)004 have been fully formed and surfaced. 
Notwithstanding the details shown on the approved plan, construction details for the
proposed passing places shall be submitted to and approved in writing by the Planning
Authority, in consultation with the Roads Authority, prior to implementation. 
Reason: In the interest of road safety.  
3.  PP - Junction with public road:
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing 08/006 Rev A. and
visibility splays of 2.4 metres to point X by 25.0 metres to point Y from the centre line of
the proposed access. 
The access road shall be a minimum width of 5.5m for the first 10m from the back of the
service bay. Thereafter it may be reduced to a private driveway of minimum 3.5m width.
The access shall be surfaced with a bound material in accordance with the stated
Standard Detail Drawing for a minimum of 5.0m back from the edge of the carriageway.
Page 64

Page 65

Prior to work starting on site the access hereby approved shall be formed to at least base
course standard and the visibility splays shall be cleared of all obstructions such that
nothing shall disrupt visibility from a point 1.05 metres above the access at point X to a
point 0.6 metres above the public road carriageway at point Y. The final wearing surface
on the access shall be completed prior to the development first being brought into use
and the visibility splays shall be maintained clear of all obstructions thereafter.
Reason: In the interests of road safety.
Note to Applicant: 
 A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road. 
 The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road.  
4. PP - Access Gradient 
Notwithstanding the provisions of Condition 1, the gradient of the service bay / access
road / driveway shall not exceed 1 in 20 within 5 metres of the edge of the existing
carriageway and shall thereafter not be steeper than 1 in 7. 
Reason:  In the interest of road safety.  
5. PP – No Walls, Fences or Hedges Beside the Road 
The development shall not include for the provision of walls, fences or hedges within 2.0
metres of the carriageway of the public road, and any gates shall open inwards, away
from the public road. 
Reason: In the interest of road safety.  
6. PP - Parking and Turning Further Details Required 
Notwithstanding the provisions of Condition 1, no development shall commence until full
details of the layout and surfacing of a parking and turning area to accommodate three 
vehicles within the application site have been submitted to and approved in writing by
the Planning Authority in consultation with the Council’s Roads Engineers. 
The submitted layout shall demonstrate that adequate manoeuvring space will be
provided within the site to allow a vehicle to enter and leave in a forward gear. 
The duly approved scheme shall be implemented in full prior to the development first
being occupied and shall thereafter be maintained clear of obstruction for the parking
and manoeuvring of vehicles. 
Reason: In the interest of road safety.  
7. PP – Submission of Details of Materials 
Page 65

Page 66

Notwithstanding the effect of Condition 1, no development shall commence until written
details of the type and colour of materials to be used for the external wall finishes and
the roof slate have been submitted to and approved in writing by the Planning Authority.
The development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings.  
8. PP – Full Landscaping Scheme 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which shall
include details of: 
i) Existing and proposed ground levels in relation to an identified fixed
datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species
and size of every tree/shrub to be planted; 
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development;
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the approved
landscaping scheme fail to become established, die, become seriously diseased, or are
removed or damaged shall be replaced in the following planting season with equivalent
numbers, sizes and species as those originally required to be planted unless otherwise
approved in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot
as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the interest
of amenity, and to comply with the requirements of NPF4 Policy 3  
9. PP / PPP / AMSC – Pre-commencement Survey 
No development or other work shall be carried out on the site until a pre-commencement
survey for the presence of Bats has been carried out by an appropriately qualified person
and has been submitted for the written approval of the Planning Authority in consultation
with Nature.Scot. In circumstances where species of interest are identified as being
present, or at risk from construction works, the survey shall further provide suggested
avoidance and or mitigation measures, including timing constraints, to address such
Page 66

Page 67

presence or risk. The development shall be implemented in accordance with the
measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
10. PP – Surface Water Drainage – Further detail required 
Notwithstanding the provisions of Condition 1, no development shall commence until
details of the intended means of surface water drainage to serve the development have
been submitted to and approved in writing by the Planning Authority, in consultation with
the Roads Authority. 
Drainage shall be achieved within the site boundary and no water shall discharge onto
the public road carriageway. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development and maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding.  
11. PP – Tree Retention and Protection 
No development shall commence until a site plan showing the Root Protection Area for
every existing tree proposed to be retained (with reference to the Tree Inspection Report
– October 2016) has been submitted to and approved in writing by the Planning
Authority. 
Tree protection measures shall be implemented for the full duration of construction works
in accordance in accordance with BS 5837:2005 “Trees in Relation to Construction” and
the Tree Inspection Report – October 2016. No trees shall be lopped, topped or felled
other than in accordance with the details of the Tree Inspection Report unless otherwise
approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation. 
Page 67

Page 68

NOTE TO APPLICANT 
 The applicant is advised that the boundary wall of Torwood House is a listed structure;
separate listed building consent will be required in relation to any works to alter the wall,
including the formation of the driveway opening and passing place formation. 
 It is strongly recommended that the applicant/developer implement the approved
development having careful regard to the advice set out in the consultation response
from the Council’s Local Biodiversity Officer dated 21st February 2023, including
incorporation of good practice ecological measures e.g. provision of pipe end capping
and escape ramps from foundation/services trenches during construction to avoid
trapping animals. The above consultation response is available for inspection in full via
the Public Access section of the Council’s website. 
 Notwithstanding the approval of planning permission, and the assessment carried out
with regard to Town and Country Planning legislation and Policy guidance, the
applicant/developer should be fully aware of their legal responsibilities and obligations
under nature conservation legislation including the Habitats Directive and Habitats
Regulations. Further details on the above are available by contacting NatureScot
directly. 
Page 68

Page 69

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 22/02523/PP    
Planning Hierarchy: Local 
Applicant: Mr D. Higgins   
Proposal: Erection of dwellinghouse, formation of vehicular access and associated work 
Site Address: Garden Ground of Torwood House, Torwoodhill Road, Rhu, Helensburgh 
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION
The purpose of this report is to advise Members that:
1) The applicant has requested that determination of this application be deferred to allow
an opportunity for him to engage in discussions to Council Officers and to prepare further
details of a scheme of commensurate off-site road improvements for assessment by Planning
Officers in consultation with Area Roads Engineers.
2) To advise Members of the implications of LDP2 as recommended by the Examination
Report.
3) To advise members of further representations received from one of the original
objectors in response to the submission of a revised site plan – proposed drawing no. 
807(L)002 Revision A, received on 21st February 2023. 
2.0 REQUEST FOR DEFERRAL
Members will be aware from the Main Report, that Council officers have assessed the proposal
as being acceptable with reference to all material considerations with the exception of impact
upon highways issues, having particular regard to the consultation response from the
Council’s Area Roads Engineer and third party representations.
It is also noted that the most recent formal consultation response from Area Roads
recommends deferral of determination pending the submission of details of commensurate
off-site improvements to the public approach road, commensurate to accommodate the
intensification of traffic movements resulting from the proposed development. These
commensurate improvements comprise the provision of two passing places on Torwoodhill
Road between the proposed site access and the junction with Upper Torwoodhill Road.
Officers published the Main Report on the basis of information available at the time of the
publication deadline in order to give the applicant a determination as soon as possible. During
the drafting of the Main Report, Officers were engaged in negotiations with the applicant with
Page 69

Page 70

regard to the commensurate improvements. However, the timescale from the start of
negotiations relative to the deadline for the publication of the report gave a very short window
of opportunity to conclude the negotiations to an extent to allow a recommendation for
approval prior to the report publication deadline. At the time of publication of the Main Report,
the recommendation was that the application be refused on grounds that the applicant had
failed to demonstrate that the required commensurate improvements could be implemented,
and as such Officers considered that a recommendation for approval subject to a planning
condition requiring implementation of the improvements would not be competent.
However, on 13th June, the applicant confirmed that the applicant:
“can provide the passing spaces in his land as he owns Torward House which is next to
the proposed site - and the spaces can be formed within his land ownership.”
On the basis of this commitment in principle, Officer’s would support the request for deferral
in order to give the applicant the reasonable opportunity to seek to agree a detailed design for
road improvements, particularly since the time available for the applicant to explore this
opportunity was significantly constrained by the deadline for reports for the June PPSL
meeting. In addition, Officers consider that the roads issue is the only one that warrants a
recommendation for refusal, and that if this issue is reasonably capable of satisfactory
resolution, then the most reasonable way to proceed would be defer formal determination to
give the applicant a reasonable timescale to prepare details of a scheme of road
improvements and to enter into further dialogue with planning officers in consultation with the
Area Roads Engineer.
The application can be reported to PPSL at the next available opportunity upon resolution of
this issue at which time the assessment will be based on a more categorical assessment of
whether the required improvements can be implemented to the satisfaction of Area Roads. 
3.0 RELEVANT PLDP2 POLICIES
Policy 01 - Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking 
Policy 06 – Green Infrastructure 
Policy 08 – Sustainable Siting 
Policy 09 – Sustainable Design 
Policy 10 – Design – All Development 
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic Built
Environment
Policy 16 – Listed Buildings 
Policy 17 – Conservation Areas 
Policy 34 – Electric Vehicle Charging
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses 
Policy 40 – Vehicle Parking Provision 
Page 70

Page 71

Policy 41 – Off Site Highway Improvements 
Policy 61 – Sustainable Drainage Systems (SUDS) 
Policy 66 – New Residential Development on Non-Allocated Housing Sites within Settlement
Areas
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development
Impact on Sites of International and National Importance.
Policy 77 – Forestry, Woodland and Trees 
Policy 79 – Protection of Soil and Peat Resources 
4.0 IMPLICATIONS OF PLDP 2 AS RECOMMENDED TO BE MODIFIED BY THE
EXAMINATION REPORT
The assessment of this proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows:
Policy 01 – Settlement Areas: The proposal is located within the Settlement Area for Rhu as
identified in PDLP2. The provisions of Policy 01 continues to set out general support for
development within the settlement area. No substantive change to previous assessment. 
Policy 04 – Sustainable Development: Promotes the principles of sustainable development
and remains generally aligned with the requirements of ABC LDP STRAT 1 and NPF 4 Policies
1 and 2 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 05 – Design and Placemaking: Sets out principles for achieving good quality places and
is generally aligned with the requirements of ABC LDP 2015 Policy LDP 9 and SG LDP
Sustainable Design, and NPF4 Policy 14 which have already been applied to the assessment
of this matter. No substantive change to previous assessment.
Policy 06 – Green infrastructure: Sets out a requirement for the developer to demonstrate how
green infrastructure has been integrated into the design of the proposal from the outset. This
policy overlaps with provisions elsewhere to consider enhancements to biodiversity and
sustainable urban drainage which have already been applied to the assessment of this matter.
No substantive change to previous assessment.
Policy 08 – Sustainable Siting: Sets out the principles for successfully integrating new
development into its landscape/townscape setting and is aligned with the provisions of NPF4
and ABC 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been
applied to the assessment of this matter. No substantive change to previous assessment.
Policy 09 – Sustainable Design: Sets out that development proposals should demonstrate
consideration of and where possible utilisation of renewable sources of energy; and
sustainable design and construction methods. The Supporting Statement accompanying the
application identifies that the proposal has been sited to maximise solar gain and would be
constructed to meets Section 7 Sustainability of Scottish Technical Standards to provide an
energy efficient build, enhanced natural lighting, home office space, energy efficient heating
and improved storage space. No substantive change to previous assessment.
Policy 10 – Design – All Development: Sets out requirements for the design of new
development and is generally aligned with the provisions of NPF4 and ABC 2015 Policy LDP
Page 71

Page 72

9 and SG LDP Sustainable Design which have already been applied to the assessment of this
matter. No substantive change to previous assessment.
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic Built
Environment: Sets out that development will not be supported where it fails to protect,
conserve or enhance the special characteristics and/or cultural significance of the historic built
environment, or to avoid any cumulative effect upon the integrity or special qualities of heritage
assets. Policy 15 is aligned with the aims of NPF4 Policy 7 and ABC LDP 2015 Policy LDP 3
which have already been applied to the assessment of this matter. No substantive change to
previous assessment.
Policy 16 – Listed Buildings: Sets out requirements for development which affects a listed
building or its wider setting. The aims of Policy 16 are aligned with the aims of NPF4 Policy 7
and ABC LDP 2015 Policy LDP 3 which have already been applied to the assessment of this
matter. No substantive change to previous assessment.
Policy 17 – Conservation Areas: Sets out a requirement that new development will preserve
or enhance the character and appearance of a conservation area. The aims of Policy 17 are
aligned with the aims of NPF4 Policy 7 and ABC LDP 2015 Policy LDP 3 which have already
been applied to the assessment of this matter. No substantive change to previous
assessment.
Policy 34 – Electric Vehicle Charging: This policy sets out a requirement for all new residential
development with private off street parking to install dedicated cable ducting connecting each
private residential parking space to the nearest electricity supply connection point capable of
supporting the installation of a 7-kilowatt EV charging point. The provisions of Policy 34
introduce an additional requirement for residential development that has not been included
within the design of the current proposal or the previous assessment. In the event that it were
proposed to grant planning permission then it would be appropriate to seek the submission of
further information to ascertain the practicability of this requirement in relation to the current
development, and if deliverable and considered appropriate, to impose a planning condition
to secure the provision of EV cable ducting within the implementation of the development.
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes: Sets out
that the acceptance of development utilising existing public roads is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority and Planning
Authority. In this instance it has been identified by the Roads Authority that the existing public
road serving the development is substandard and unsuited to accommodate additional
development without improvement; a detailed assessment is set out in the main report of
handling of this aspect in relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and
SG LDP TRAN 5. On the basis that the applicant has not demonstrated that they would be
able to address the underlying issues relating to street design and road safety the proposal
would be viewed as contrary to the provisions of Policy 35. No substantive change to previous
assessment.
Policy 36 – New Private Access: Sets out the circumstances where a new private access may
be considered to be acceptable. In this instance the proposal would connect to the public road
by a private driveway connection and would be consistent with the principles of Policy 36a.
No substantive change to previous assessment.
Policy 40 – Vehicle Parking Provision: Sets out standards for off street car and vehicle parking.
The proposed provision of 3 onsite parking spaces would be consistent with the requirements
of Policy 40. No substantive change to previous assessment.
Policy 41 – Offsite Highway Improvements: Sets out an expectation that where new
development would be served by a substandard private or public approach road then it will
contribute proportionately to improvements to an agreed section of the public or private road
Page 72

Page 73

network. A detailed assessment is set out in the main report of handling of this aspect in
relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and SG LDP TRAN 5. No
substantive change to previous assessment.
Policy 61 – Sustainable Urban Drainage Systems: Sets out a requirement that proposal for
SuDS are required in relation to all development prior to determination. The proposal has been
amended to include detail that SuDS are to be designed and installed in accordance to BRE
Digest 365 Soakaway Design and BSEN - 752-4. No substantive change to previous
assessment.
Policy 66 – New Residential Development on Non-Allocated Housing Sites within Settlement
Areas: Sets out criteria to be applied to new residential development on non-allocated sites
which seeks to secure an appropriate relationship with existing properties, respect the
character of the locale, and to ensure that appropriate standards of access and parking are
secured. The provisions of Policy 66 are aligned with the provisions of NPF 4 Policy 14, and
elements of ABC LDP 2015 Policy LDP 9 and SG LDP Sustainable Design, Policy LDP 11
and SG LDP TRAN 4 and SG LDP TRAN 6 which are all covered within the previous
assessment. No substantive change to previous assessment.
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development Impact
on Sites of International and National Importance. The provisions of Policy 73 are generally
aligned with the requirements of NPF4 Policy 3, and ABC LDP 2015 Policy LDP 3 and Sg LDP
ENV 1 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 77 – Forestry, Woodland and Trees: Sets out criteria for the assessment of
development impact on woodland and trees. The provisions of Policy 77 are aligned with the
requirements of NPF4 Policy 6; ABC LDP 2015 Policy LDP 3, and SG LDP ENV 6 which have
already been applied to the assessment of this matter. No substantive change to previous
assessment.
Policy 79 – Protection of Soil and Peat Resources: Sets out that the Council will only support
development where appropriate measures are taken to maintain soil resources and functions
through measures that are proportionate to the development. Policy 79 is aligned with the
provisions of NPF4 Policy 5 which have already been applied to the assessment of this matter.
No substantive change to previous assessment. 
6.0 ADDITIONAL REPRESENTATIONS
Since publication of the Report, an amended representation has been received from:
 Albert Barclay - Carbeth House, Torwoodhill Road, Rhu
Representations are published in full on the planning application file and are available to view
via the Public Access section of the Council’s website, and a summary of the issues raised
are summarised as follows:
 The further information provided by the revised Drwg 807(L)002A is a substantive
amendment to the application and additional information should be provided by the
applicant to demonstrate that the proposed soakaway solution is fit for purpose. 
 The underlying strata of the site is rock, so it is questionable how the principle of
soakaways (proprietary or otherwise) would actually work effectively. 
Page 73

Page 74

 The implications will be far reaching in terms of flood risk to adjacent infrastructure and will
not be easily rectified if a wrong assessment is made. 
 A detailed Drainage Survey should be required for approval by the relevant authorities as
a condition of planning approval, particularly given the revised proposals. 
 Additional particulars and detailed information should be required for proper consideration
prior to approval by committee. 
Comment: - With respect to the objector, the latest representation offer some clarity on the
issue of surface water/land drainage in respect of the revised drawings, however it does
not raise any new material planning issues over and above those set out, and fully
assessed in the Main Report. The revised representation does not raise any new issues
that requires an amendment to the Main Report. 
 The revised drawing does not address waste and soil water discharge. This matter also
needs to be fully addressed. 
Comment: - The application details propose that foul water drainage be by means of a
connection to the public drainage network. The consultation response from Scottish Water
does not indicate that there are any constraints that would warrant further information from
the applicant in this respect. Land water drainage should be assessed as part of the
proposed private surface water drainage system. No changes to the main Report are
required in response to this issue. 
7.0 CONCLUSION
Request for Deferral
Having regard to all material considerations, including the planning history of a planning
permission for a similar development on this site in 2017; the consultation response from Area
Roads on the current application; and the acceptance of the applicant in principle to implement
off-site road improvements to provide two passing places on the public approach road; and
given that Officers are otherwise minded to support this proposal, it considered wholly
appropriate in these circumstances to allow the applicant every reasonable opportunity to
seek, with Council Officers, to continue to seek a resolution that accords with the consultation
response from Area Roads and with relevant transport/access policy.
However, should Members wish to determine the application on the basis of the information
available at the time of publication of the Report, then the following matters should be noted.  
LDP2 Assessment
Proposed Local Development Plan 2 as recommended to be modified by the Examination
Report is now a significant material consideration. However, in this case there is no significant
material change of policy between the Adopted Plan and Proposed Local Development Plan
2 as recommended to be modified by the Examination Report that would require further
assessment or lead to a change in the recommendation.
Further Representations
Page 74

Page 75

Whilst the latest representation received provides some clarity to the original objection in
response to the submission of a revised site plan drawing showing soakaway drainage, with
respect to the objector, it does not raise any new issues that have not been assessed within
the body of the Main Report. For Members convenience, should planning permission
ultimately be approved, then it is recommended by officers that it be subject to a suspensive
planning condition requiring the submission and approval of further drainage details for
assessment by officers in consultation with the Council’s Flood Risk Assessor. 
6.0 RECOMMENDATION 
1) That Members defer determination of this application to allow an opportunity for the
applicant to prepare and submit further details to demonstrate to the satisfaction of Council
Officers that there are no constraints to the implementation of an agreed scheme of
commensurate off-site road improvements.
Should Members wish to determine the application at the meeting on 21st June 2023,
notwithstanding the Officer’s recommendation above, then the secondary recommendation is
that: 
2) Members note the additional representation received: and, 
3) Determine the application in accordance with the Head of Development & Economic
Growth’s report dated 13th June 2023. 
Author of Report: N. Shewan  Date: 20.06.2023
Reviewing Officer:  Sandra Davies Date: 20.06.2023 
Fergus Murray 
Head of Development and Economic Growth 
Page 75

Page 76

This page is intentionally left blank

Page 77

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 22/02523/PP
Planning Hierarchy: Local
Applicant: Mr D Higgins
Proposal: Erection of dwellinghouse, formation of vehicular access and
associated works
Site Address:  Garden Ground of Torwood House, Torwoodhill Road, Rhu,
Helensburgh, Argyll And Bute    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
 Sub-division of curtilage of single residential development to create a site
for erection of a new separate dwellinghouse
 Erection of a dwellinghouse
 Formation of access and driveway
 Associated land engineering works/re-profiling existing ground levels
 Installation of surface water drainage system 
(ii) Other specified operations
 Connection to existing public water supply network
 Connection to existing public drainage network 
(B) RECOMMENDATION: 
It is recommended that planning permission be refused. 
(C) CONSULTATIONS:   
ABC Roads (08.03.2023):
Torwoodhill Road, in its current layout is considered unsuitable to serve the existing
properties and the proposed new development.
It is recommended that determination of the application be deferred until details of
commensurate improvements to Torwoodhill Road are submitted for assessment.
Page 77

Page 78

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Commensurate improvements should include the creation of 2No. intervisible
passing places between the Upper Torwoodhill Road junction and the access to the
proposed. This could include the creation of a ‘Service Bay’ access arrangement at
the access to the proposed development. 
ABC Local Biodiversity Officer (21.02.2023):
1) The submitted Tree Report does not provide advice on the timing for opening up
the site for foundation construction with reference to impact on birds.
2) Requests a planning condition requiring a pre-start ecological survey to be
carried out in advance of excavation works, if it is proposed to commence during
the bird nesting season.
3) Advises that good practice measures e.g. pipe end capping and escape ramps
from foundation/services trenches should implemented during construction to
avoid trapping animals.
4) Advises that submission, assessment and approval of a Landscape Design
Planting Plan be required by planning condition. 
ABC Built Heritage & Conservation Officer (22.02.2023:
Planning Permission Ref 16/03045/PP was granted for the sub division of the plot
and proposed new dwellinghouse. Whilst the same LDP is currently in place, there
has been a material change in that the NPF4 has now been adopted which requires
to be taken into account as part of a proper assessment of the current application.
It is not considered that the supporting information submitted as part of the Planning
Statement provides sufficient assessment of the character of the conservation area
and the properties (both listed and un-listed within it) to allow a full assessment
against the provisions of NPF4 Policy 7.
Notwithstanding the above required information, initial concern is expressed that:
1) the proposed development is at odds with the existing pattern of
development/urban grain; and,
2) there is a lack of justification for the architectural style of the proposed house in
relation to the mixture of distinct architectural styles for existing houses within the
area.
It is suggested that the applicant submits a more comprehensive assessment of the
historic assets and the likely impacts of the proposal which may help to address these
concerns. 
Scottish Water (03.02.2023):
No objection. This does not confirm that the proposed development can currently be
serviced. Further investigation regarding Water Capacity Assessment may be
required when a formal application is submitted to Scottish Water. Suggest that the
applicant submits a Pre-Development Enquiry to Scottish Water to allow a full
assessment of waste Water Capacity. Scottish Water will not accept any surface
water connections into their combined sewer system. 
(D) HISTORY:   
20/01190/PP - Conversion of garage into dwellinghouse, erection of two storey
extension and installation of air source heat pump at Garden Ground Of Torwood
House – Approved 18.10.2020. 
16/03045/PP – Erection of dwellinghouse at Garden Ground Of Torwood House,
Torwoodhill Road, Rhu – Approved 01.12.2017 
Page 78

Page 79

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(E) PUBLICITY:   
Site Notice - Conservation Area – Expired 22.02.2023 
Site Notice - Setting Listed Building – Expired 22.02.2023 
Listed Building/Conservation Advert – Expired 02.03.2023 
Neighbour Consultation – Expired 22.02.2023 
(F) REPRESENTATIONS:   
(i) Representations received from: 
Representations are published in full on the planning application file and are
available to view via the Public Access section of the Council’s website. 
A total of thirteen representations have been received from third parties.
Twelve of these are objections to the proposal and the remaining one does
not object in principle subject to concerns regarding drainage being satisfied
prior to determination of the application. 
It is noted that whilst the status of several third party submissions has been
expressed as an “objection” - their concerns may be satisfied by resolution of
these identified concerns ((primarily relating to drainage and roads/access.) 
Objection: 
 Hilary Stuart – Dunaivon, Armadale Road, Rhuu Helensburgh, Argyll and
Bute G84 8LG
 Dr. Florence Watt - Acorn Cottage, Invergare Cottages, Glenarn Road,
Rhu, Helensburgh, Argyll and Bute G84 8LL
 Miss Kim Maclean - The Cottage, Invergare, Glenarn Road, Rhu
 Mrs. Jill Wadge - 5 Torwoodhill, Torwoodhill Road, Rhu, Helensburgh,
Argyll and Bute G84 8LE
 Ms. Carolan Dobson – Auchenlea, Torwoodhill Road, Rhu, Helensburgh,
Argyll and Bute G84 8LF
 Frazer King – Hazelwood, Torwoodhill Road, Rhu, Helensburgh, Argyll
and Bute G84 8LF
 Nick Barton – Dunrowan, Armadale Road, Rhu, Helensburgh, Argyll and
Bute G84 8LG
 Mrs. Celia Taylor - Rowan House, Armadale Road, Rhu, Helensburgh,
Argyll and Bute G84 8LG
 Jane Nicholson - Torwood Cottage, Armadale Road, Rhu
 Albert Barclay - Carbeth House, Torwoodhill Road, Rhu
 Michael Thornley - Glenarn House, Glenarn Road, Rhu, Helensburgh
 Sue Thornley - Glenarn House, Glenarn Road, Rhu, Helensburgh
 Mrs. Norma Bennie – Oakdene, Armadale Road, Rhu, Helensburgh,
Argyll and Bute G84 8LG 
Representation:
 Tim Esson - Melsetter ,Torwoodhill Road, Rhu, Helensburgh, Argyll and
Bute G84 8LF 
Page 79

Page 80

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
(ii) Summary of issues raised: 
 Drainage Infrastructure/Surface Water Flood Risk:
Sewage system does not have capacity to serve an additional house.
Anecdotal evidence of recent sewer blockages on Torwoodhill Road is
submitted in support the above. 
Anecdotal evidence is submitted with regard to regular flooding on the
local road network and adjacent residential properties. It is submitted that
this has significantly worsened after clearance of vegetation from the
application site. 
The application does not include details of a specific drainage plan. The
drawings indicate “Aco” type drains at the bottom of the driveway with no
information on where these discharge to. 
Proposal is likely to exacerbate surface water flooding on public adopted
road and nearby properties on lower ground to the south, and the integrity
of the existing retaining wall may be threatened. 
Planning permission should not be approved until a full drainage impact
survey has been carried out, and an effective and comprehensive surface
water drainage system agreed. 
(It is understood (by an objector) that soakaways are proposed however
this is unlikely to be achievable due to underlying ground conditions). 
Comment: - It is noted that planning permission has previously been
approved for the erection of a house on this site in December 2017
subject to a planning condition that the development incorporate a
Sustainable Urban Drainage System (SuDS). The current application
submission has been revised to show further detail with regard to the
proposed surface water drainage design. Officers accept that further
details are required to demonstrate to the satisfaction of the local
planning authority that adequate surface water drainage can be provided
to serve the propose development particularly with regard to the
suitability of a soakaway; however Officers are satisfied that the current
information available provide sufficient assurance that the site is capable
of development, and that the exact technical design, based on a
geological survey, if required, can be satisfactorily dealt with by means
of a suspensive planning condition. The Council’s Flood Risk Consultant
will be consulted as part of that process. 
 Access and Road Safety:
The proposal will result in further intensification of traffic using a sub-
standard access (Torwoodhill Road) and will increase safety hazards to
drivers and pedestrians. 
Size of the site results in “less than adequate” arrangements for access
and egress. 
Comment: - Noted. The consultation response from Area Roads will be
given significant material weight as part of this assessment. Area Roads
consider that Torwoodhill Road is unsuitable, in its current layout, to
service a further intensification of use generated by the proposed
Page 80

Page 81

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
development. Area Roads recommend deferral of the application
pending submission of details of commensurate improvements to
Torwoodhill Road, to comprise 2 no. intervisiible passing spaces to the
west of it’s junction with Upper Torwoodhill Road. Following further
clarification of the requirement for commensurate off-site access
improvement works, this requirement has been confirmed to the
applicant with request that the applicant confirm that he has
ownership/control over sufficient land (if required outside of the public
road corridor) to provide the passing spaces and whether he is willing to
provide the required improvement works.
A response is awaited.   
 Historic Environment
Objection to “yet another property being built in the garden of a
conservation village.” 
The layout/siting; development density and design style of the house
does not reflect the character (inc. historic grain) of the conservation
area. 
Comment: - These issues are assessed in full within Section (P) below. 
 Residential/Visual Amenity
Screening onto Torwoodhill Road needs to be carefully considered to
maintain privacy of residents in existing houses (and preserve the
ambience of the local area.) 
Replacement tree planting should be addressed to reflect the character
of the area. 
Comment: - Having regard to Policy LDP 9 and SG LDP – Sustainable
Guidance and Design principles - it is considered that the proposed
development, by reason of its siting and orientation relative to nearby
residential properties; and the visual screening provided by existing and
proposed natural planting along the site boundaries, will not have a
materially adverse impact upon residential amenities of the occupiers of
nearby properties by reason of loss of privacy through overlooking
between windows to habitable rooms. 
 Miscellaneous
Construction related activity/parking etc. may cause temporary
blockages to Torwoodhill Road to the detriment of the amenities of
existing residents, including potential obstruction of emergency vehicles. 
Comment: - Whilst the concerns of local residents are noted, this is not a
material consideration that can form part of this assessment. Any
obstruction of the public road system by contractors would be a matter
for parking enforcement or police Scotland. 
The application should not be determined until an up-to-date Tree Report
has been submitted. 
Page 81

Page 82

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Comment: - Officers consider that the Tree Report dated October 2016
is adequate to allow a full and professional assessment of the proposed
development impact upon trees within the application site. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No  
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No  
(iii) A Design or Design/Access statement 
Planning Design  Statement
 This application is for minor changes to a
proposal for a single dwellinghouse
previously approved under ref: 16/03045/PP
(since expired.)
 Site description, context and history is set
out.
 The design incorporates traditional features
evident in neighbouring properties,
particularly Torwood House and high quality
materials are proposed to ensure that the
building will respect and enhance the area
and preserve the listed building and its
setting in accordance with relevant planning
policy.
 An existing access onto Torwoodhill Road
will be widened and otherwise improved.
 Parking and turning for 3 cars will be
provided within the site.
 Drainage channels to be installed across the
access junction and the driveway to mitigate
any water run-off from the development.
 The site will be served by a connection to
mains water and sewage systems.
 Landscape design proposes retention of
mature trees where recommended by an
accompanying Tree Survey Report, and
additional planting where trees are to be
removed. The North West of the site is to be
retained to maintain existing screening
between the site and the neighbouring
property, Carbeth.
 The proposal is sustainable development
with reference to siting/orientation and there
is an aim to meet high technical standards
e.g energy efficient build; energy efficient
☒Yes ☐No
Page 82

Page 83

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
heating; enhanced natural lighting; home
office space; etc.  
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc: 
Tree Report
 Sets out the legal position with regard to
trees and wildlife, specifically in relation to
bats and birds.
 Details of the tree survey and analysis
methodology and tree categorisation.
 None of the 34 trees surveyed are classed
as Category A trees. 14 no. trees are
Category B and 16 are Category C. Five
trees are Category U (either already dead or
in such poor condition that they should be
removed regardless of development.)
 Recommended management includes
removal of overgrown laurel and
rhododendron which has suppressed the
surrounding trees; and remedial tree work
operations including felling of 27 no. trees. 8
no. trees are proposed “to accommodate the
development”.
 Recommends Tree Protection Measures
during construction n in accordance with BS
standards – Trees and Construction. 
☒Yes ☐No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
Page 83

Page 84

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 16 – Quality Homes
NPF4 Policy 22 – Flood Risk and Water Management 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 6 – Impact on Trees / Woodland 
Historic Environment and Archaeology 
SG LDP ENV 16(a) – Impact on Listed Buildings
SG LDP ENV 17 – Development in Conservation Areas and Special Built
Environment Areas (SBEAs) 
General Housing Development 
SG LDP HOU 1 – General Housing Development Including Affordable Housing
Provision 
Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development 
Transport (Including Core Paths)
Page 84

Page 85

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 5 – Off-site Highway Improvements
SG LDP TRAN 6 – Vehicle Parking Provision 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. (delete as appropriate) 
 Historic Environment Scotland - HEPS
 Historic Environment Scotland – Managing Change in The Historic
Environment  
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The reporters have
written to Argyll and Bute Council regarding the Proposed Local Development Plan 2, which
is currently at Examination. Due to the status of the revised draft National Planning
Framework 4 the reporters are currently determining what, if any, further processes are
required as a consequence. Although PLDP2 remains a material consideration it is now
subject to this further assessment against NPF4 policies. Therefore, it considered
appropriate not to attach significant weight to PLDP2 policies during this time, i.e. until the
consequences of NPF4 policies for the PLDP2 have been assessed by the reporters and
the Examination report is issued. Specific sites in PLDP2 that have not received
objections and are not being dealt with at the Examination may continue as strong
material considerations, e.g. allocations and potential development areas. 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No 
(N) Does the Council have an interest in the site:  ☐Yes ☒No 
(O) Requirement for a pre-determination hearing: ☐Yes ☒No    
(P)(i) Key Constraints/Designations Affected by the Development:
 Setting of a Listed Building
 Conservation Area
 Existing trees 
(P)(ii) Soils
Agricultural Land Classification:  Built Up Area
Page 85

Page 86

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3 
☒N/A 
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No ☐N/A 
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A 
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland? 
☒Yes
☐No 
Does the proposal include any replacement or
compensatory planting?
☒Yes
☐No details to be secured by condition
☐N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 (tick all relevant boxes)
☐Main Town Settlement Area
☐Key Rural Settlement Area
☒Village/Minor Settlement Area
☐Rural Opportunity Area
☐Countryside Zone
☐Very Sensitive Countryside Zone
☐Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs etc: N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
The proposed development comprises the sub-division of a residential curtilage, and
the erection of a new detached 4-bedroom house with new access; land engineering
works; and installation of a private surface water drainage system. 
The site is located within the Village/Minor Settlement Zone of Rhu as identified in
the Argyll and Bute Local Development Plan 2015 (LDP) wherein Policy LDP DM 1
gives encouragement to sustainable forms of small scale development on
appropriate sites. 
The proposal lies within the Rhu Village Conservation Area and both the ‘donor
property’ “Torwood house”, and the residential property adjacent to the north,
“Carbeth House” are both Category “C” listed buildings. As such, the impact of the
proposed development on the historic environment will be a determining factor. In
Page 86

Page 87

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
addition, the proposed development has been assessed more generally with regard
to siting, scale, massing form, and detailed design in relation to the aim of respecting
and reflecting the visual character of the existing built development patter; and
protecting local residential amenity in terms of loss of privacy by reason of direct
over-looking of nearby houses. 
The site is not located within or in proximity to any nature conservation designation
and existing trees are not specifically protected by a Tree Preservation Order, nor do
they lie within NatureScot Ancient Woodland Inventory. However, any impact upon
the natural environment in relation to biodiversity and impact on trees/woodland falls
to be assessed in connection with the proposal. 
The proposal has also been assessed with regard to the satisfactory provision of
services infrastructure provision. 
A fully detailed assessment with reference to the above determining factors, and all
other material considerations, including planning history and material planning issues
raised by third party representations are set out in the Appendix A to this report. 
Having regard to all material considerations it is considered that the proposal cannot
be supported on the basis of the information currently available. It is considered that
existing public approach road, “Torwoodhill Road”, is unsuitable to accommodate the
intensification of traffic that will be generated by this additional house without
detriment to road safety and the free flow of traffic. The applicant has been unable to
demonstrate to the satisfaction of the planning authority that commensurate
improvements can be implemented as part of the development in order to address
current road access constraints. It is therefore recommended that the application be
refused on road safety grounds. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
N/A 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Not applicable. 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No (If yes provide detail below)   
Author of Report: Norman Shewan Date: 02.06.2023 
Reviewing Officer: Sandra Davies Date: 13.06.2023
Page 87

Page 88

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Fergus Murray
Head of Development & Economic Growth 
Page 88

Page 89

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 22/02523/PP 
1. It is considered that the proposed public road access regime is unsuitable, in
terms of width and alignment, to accommodate the resultant intensification of
traffic movements generated by the proposed development and would result in
an increase in road traffic hazards to the detriment of highway safety and the
free flow of traffic contrary to the provisions of Policy LDP 11; SG TRAN 4 and
NPF 13. On the basis of the submitted information, the applicant is unable to
demonstrate that the design issues relating to this substandard access
approach road can be addressed by commensurate improvements to the
satisfaction by the Council as Roads Authority to a level that can serve the
additional vehicular and pedestrian movements that will result from the
proposed development. 
Page 89

Page 90

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  22/02523/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Settlement Strategy 
1.1. The site is located within the Village/Minor Settlement Zone of Rhu as identified in the
Argyll and Bute Local Development Plan 2015 (LDP) wherein Policy LDP DM 1 gives
encouragement to sustainable forms of small scale development on appropriate sites. 
1.2. The proposed residential development is considered to be “small-scale” with reference to
SG LDP HOU 1 – “General Housing Development Including Affordable Housing.” Policy
LDP 8 and SG LDP HOU 1 serve to operate a presumption in favour of housing
development in accordance with the nature and scale of development set out in Policy
LDP DM 1, and advises that such development “will be supported unless there is an
unacceptable environmental, servicing or access impact.” 
1.3. NPF 4 Policy 1 requires that significant weight be given the global climate and nature
crises when considering new development.  Policy 2 seeks to encourage, promote and
facilitate development that minimises emissions and adapts to impacts on climate change.
NPF 4 Policy 5 aims to protect locally, regionally, national and internationally valued soils. 
1.4. The development is located within an identified settlement with access to community
facilities and public transport networks, consistent with the LDP Settlement Strategy, and
as such complies with the Sustainability criteria established by Policy LDP STRAT 1, and
is compatible with the provisions of NPF 4 Policy 1 in terms of addressing the Climate
Crisis in principle. The site is located within an established residential area and will not
impact upon soil that has material value. It is recommended that any planning permission
will be subject to a model planning condition 
1.5. On the above basis, it is considered that there is a general presumption in favour of the
principle of this proposed development in terms of its location, nature and scale when
assessed against the policy provisions relating to the LDP Settlement Strategy and
relevant NPF 4 Policy. 
2. Location, Nature and Design of Proposed Development 
2.1. Torwood House is a large, detached Category B listed traditional villa set in a very large
curtilage characterised by mature trees, hedgerows and large shrubs that bound the site.
It is accessed off Torwoodhill Road. Torwood House is sited towards the upper north west
of the grounds and overlooks the Gareloch. 
2.2. The proposal is to subdivide this site to create a plot of some 1040m2 within the south
west corner of the grounds for a new dwellinghouse. The application site is bounded to
the east and north by the remaining curtilage of Torwood House and the west by an
adjoining dwellinghouse known as Carbeth House. This latter property is also a Category
B listed building. There is an established natural belt of trees and large shrubs along the
western site boundary separating it from the grounds of Carbeth House. Lastly, the site is
bounded to the south by a public adopted road known as Torwoodhill Road. The level of
Page 90

Page 91

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
the site slopes downwards towards the road and the boundary is demarcated by a stone
retaining wall. 
2.3. Evidence suggests that there was an original pedestrian gated access to the grounds of
Torwood House within the site frontage of the current application site. This gate has been
removed; perimeter trees removed; the small opening in the stone boundary wall
significantly enlarged; and ground engineering works carried out to form an access track
from the level of Torwoodhill Road up the central part of the application site. The
application site has been fenced off from the rest of the curtilage to Toward House and
the central area cleared of vegetation. 
2.4. The site slopes reasonably steeply upwards from south to north.  The houses to the south
of Torwoodhill Road sit much lower than the proposed plot.   
2.5. The proposed house is to be sited towards the north west corner of the site. A level
‘plateau’ for the siting of the house, and a driveway at the southern edge of the site will
be formed by ground engineering works. The level of the proposed house will sit
significantly above the level of Torwoodhill Road. It will be set back some 17.3 metres
from the southern boundary with the public road and set in approximately 2.16 metres
from the western boundary (with Carbeth House). The proposed dwellinghouse will have
4 bedrooms with a floor area of approximately 130 square metres and a maximum ridge
height of 8.5 metres.  It will be traditional in design to reflect the architectural character of
Torwood House. Two projecting gable forms at either end of the principal (south) elevation
serve to visually ‘break up’ the massing of the new building; and in conjunction with
traditional chimneys and finial, this will provide an attractive, well-considered form and
‘animated’ roofscape. External wall finishes are to be off-white coloured render with stone
detailing, a natural slate roof and timber framed windows. 
2.6. The site previously had a wooded character however a number of trees and shrubs have
been removed as recommended in a Tree Survey Report submitted as part of this
application. The removed trees and clearance relates mostly to the southern site
boundary with the road and the central area of the site. Trees and large shrubs remain
along the north, east and west boundaries to maintain the privacy of neighbouring
properties.  New trees will be planted to the front of the site to further protect privacy and
to help the development to integrate into its surroundings. 
2.7. NPF4 Policy 14 requires that development proposals be designed to improve the quality
of an area; and, offers support to development that achieve the six qualities of Health;
Pleasant; Connected; Distinctive; Sustainable; and, Adaptable. Development that is
poorly designed, detrimental to the amenities of surrounding areas or inconsistent with
the aforementioned six qualities will not be supported. 
2.8. NPF Policy 14 is closely aligned with the provisions of Policy LDP 9 and SG LDP
Sustainable Siting and Design Principles which requires that new development be
assessed against identified sustainability criteria and identified design criteria relating to
the Design of New Housing in Settlements. The Supplementary Guidance also
establishes design criteria that seeks to protect the residential amenities and daylight
enjoyed by the occupiers of neighbouring properties. 
2.9. Having regard to the built development pattern and densities of the local area, it is noted
that there is a range of scale and design of houses, and whilst the overall pattern of built
development is very spacious, there is a range of site densities; and that the ratio of built
development to open curtilage in the case of this proposal is similar to some other existing
development. The scale of the house is comparatively small and it is considered that the
siting, form, massing and material finishes will respect and reflect the existing character
Page 91

Page 92

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
of built development and compliment the visual character of the area in accordance with
the relevant provisions of NPF4; LDP 9 and SG on Sustainable Siting and Design
Principles. 
2.10. The proposed house will be screened from Carbeth and Torwood House by existing
natural boundary features and this screening, in conjunction with the relative orientation
of windows and separation distances will mean that there will be no material loss of
residential amenities to the occupiers of these properties by reason of overlooking. The
properties to the south of the site, “Dunrowan” and “Hazelwood” are set at a significantly
lower level than the proposed development due to the prevailing slope.  However, the
windows on the south elevation of the proposed house is in excess of the minimum 18
metres guideline (SG – Sustainable) from windows on the rear elevations of these
properties. Additionally the windows in the proposed house do not directly face the rear
windows at Hazelwood. There is an existing natural boundary along the rear of
“Dunrowan” and supplementary planting proposed along the southern edge of the
application site will mitigate any issue of loss of privacy to an acceptable level. On this
basis, Officers area satisfied that the proposed development will not have a material
impact upon the residential amenities of nearby properties in accordance with the
provisions of NPF4 Policy 14 and Policy LDP 9/SG – Sustainable Siting and Design
Principles. 
3. Natural Environment 
3.1. NPF4 Policy 3 generally seeks to protect biodiversity, reverse biodiversity loss and to
deliver positive benefits from development that strengthens nature networks. Policy 3(c)
requires that proposals for local development will include appropriate biodiversity
measures proportionate to the scale and nature of the proposal. Policy 3(d) requires any
potential adverse impacts on biodiversity/nature networks/natural environment to be
minimised by planning and design. NPF 4 Policy 3 is generally aligned with LDP Policy,
although NPF 4 Policy 3(c) goes beyond the LDP requirements in relation to current
biodiversity interests of the site. 
3.2. NPF 4 Policy 4 generally confirms that development that will have an unacceptable impact
on the natural environment will not be supported. Outside of European, national and local
designations, development is expected to meet the relevant statutory tests in terms of
protected species legislation; and potential impacts must be fully considered prior to
determination of planning applications. NPF 4 Policy 4 (insofar as it relates to the location,
nature and scale of the current proposal) largely aligns with the provisions of LDP policy. 
3.3. Policy LDP 3 (the Argyll and Bute Local Development Plan – 2015) generally serves to
support the protection, conservation and enhancement of the environment.  SG LDP ENV
1 ensures that other legislation relating to biodiversity habitats are fully considered in
relation to development proposals; and generally that development does not have an
adverse impact on habitat or species, particularly in relation to habitat or species
designated as being of European, national or local significance. 
3.4. The site is not located within or in proximity to any nature conservation designation. 
3.5. The site was previously a small ‘pocket’ of woodland and ground cover vegetation within
the corner of the extensive grounds to Torwood House, however this wooded area is not
overlain by a Tree Preservation Order, nor does it form part of any woodland within the
NatureScot Ancient Woodland Inventory. 
Page 92

Page 93

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
3.6. The Council’s Local Biodiversity Officer has been consulted on the basis of potential
impact upon wildlife habitat with particular regard to the felling of trees and scrub
clearance (although a large part of this has been implemented.) 
3.7. The consultation response from the Council’s Local Biodiversity Officer has noted that the
submitted Tree Report has provided the applicant information on Bats, the law and
licencing, along with Birds and the law, although it does not provide advice on the timing
for opening up the site for foundation construction with reference to impact on birds. On
this basis, it is considered that adequate information has been submitted to allow an
assessment on impact on species and habitats in accordance with the provisions of NPF
4 Policy 3(c). 
3.8. However, it is recommended that any permission be subject to a planning condition
requiring a pre-start ecological survey to be carried out in advance of excavation works,
if it is proposed to commence during the bird nesting season. 
3.9. It is also advised that submission, assessment and approval of a Landscape Design
Planting Plan be required by planning condition. (With regard to the latter, additional
information relating to new planting has been submitted on the revised Site Plan –
Proposed drawing showing the SUDS design, and the Council’s Local Biodiversity Officer
has not had the opportunity to assess this.) It is recommended that planning permission
be subject to a condition requiring the submission of further information, should the
Council not be satisfied with the level of information already submitted. 
3.10. Good practice measures e.g. pipe end capping and escape ramps from
foundation/services trenches should be implemented during construction to avoid
trapping animals. It is recommended that any permission be accompanied by an advisory
in relation to the above. 
4. Built / Historic Environment 
4.1. The application site forms part of the original grounds of a Category B listed building,
“Torwood House.” Additionally, the western site boundary is shared with an adjoining
Category B listed building, “Carbeth House.” 
4.2. The site is located within the Rhu Conservation Area. 
4.3. NPF4 Policy 7 generally seeks to protect and enhance the historic environment, assets
and places, and to enable positive change as a catalyst for the regeneration of places.
Policy 7(a) requires that development proposals with a potentially significant impact on
historic assets or places be accompanied by an assessment based on an understanding
of the cultural significance of the asset and/or place. Development will only be supported
where the character and appearance of the conservation area is preserved or enhanced;
and where the existing natural and built features which contribute to the character of the
conservation area (including boundary walls, trees and hedges) are retained. 
4.4. The provisions of NPF 4 Policy 7 (as it applies to the current proposal) are LDP 3 and SG
LDP ENV 16(a) and SG LDP ENV 17, however NPF 4 Policy 7(a) imposes an additional
requirement for a detailed assessment as summarised above. 
4.5. The Council’s Design and Conservation Officer makes reference to NPF 4 Policy 7(a) and
the requirement for an assessment of the historic assets and the likely impacts of the
proposed development and advises that such an assessment could demonstrate that the
sub-division of the curtilage to provide a house plot is appropriate; as well as
demonstrating the most appropriate siting, scale and detailed design for the proposal. The
Page 93

Page 94

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
assessment could be used to address two initial concerns expressed by the Design and
Conservation Area: 
1) How the proposal addresses the urban grain in the area; and, 
2) The architectural style (which has been designed to reflect the architectural
character of Torwood House.) 
4.6. Whilst the ‘new’ requirements for an assessment under the provisions of NPF 4 Policy
7(a) are acknowledged, it is also considered that significant material weight should be
given to planning history, specifically planning permission reference 16/03045/PP for an
identical house design (but handed), in a similar siting to the current proposal, that has
been approved in late 2017. The Case Officer’s Report of Handling clearly set out the
policy context relating to the siting within the Rhu Conservation Area and the
consequential requirement for both a high quality design and for it to be of a scale that
respects the character and appearance of the (conservation) area and the surrounding
listed properties. During the processing of this (16/03045/PP) application, the originally
submitted scale and design style was assessed as being inappropriate to the historic
environment. In response, a revised design was submitted as a non-material amendment
that effectively reduced the scale of the building and adopted a more traditional
architectural style. The Report of Handling concluded that “the scale and design of the
proposed new house (as amended) is acceptable and in accordance with Development
Plan policies.” As such, a favourable assessment has been relatively recently carried out
with reference to Policy 3 and SG LDP 16(a) -  SG LDP ENV 17 – Development in
Conservation Areas. 
4.7. It is noted that the policy context has changed since that favourable assessment only in
that NPF 4 Policy 7(a) would now normally require a more substantial Assessment to
support the design process. Specifically, there are no changes to policy with regard to the
‘tests’ for assessing whether the proposal will have an acceptable impact on historic
assets. On the basis that a favourable assessment has previously been carried out by the
planning authority, and that the Policy ‘tests’ for assessment have not changed since then,
it is considered that the submission of an Assessment under the provisions of NPF 4
Policy 7(a) would unnecessarily delay determination whilst not adding any value to the
quality of the decision making process, notwithstanding the consultation response from
the Council’s Design and Conservation Officer. 
4.8. Whilst there may be a ‘technical’ conflict with NPF 4 Policy 7(a) in relation to the level of
supporting information submitted, having regard to the relative weight of material
considerations including the previous favourable assessment in late 2017, Officers are
satisfied that the proposed development, by reason of siting, scale, form and architectural
style is of a sufficiently high standard and will otherwise at least preserve the charctaer
and appearance of this part of the Rhu Conservation Area in accordance with NPF 4
Policy 7, Policy LDP 3, SG LDP 16(a), and relevant HES guidance on development impact
on historic assets. 
5. Impact on Woodland 
5.1. The site previously comprised a large corner of a garden characterised by unmanaged
woodland with dense undergrowth. 
5.2. None of the trees on the site are protected by a Tree Preservation Order; nor are they
within the NatureScot Ancient Woodland Inventory/Sem-natural ancient woodland. 
Page 94

Page 95

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
5.3. None of the 34 trees surveyed are classed as Category A trees. 14 no. trees are Category
B and 16 are Category C. Five trees are Category U (either already dead or in such poor
condition that they should be removed regardless of development. 
5.4. The Tree Report recommends management including removal of overgrown laurel and
rhododendron which has suppressed the surrounding trees; and remedial tree work
operations including felling of 27 no. trees. 8 no. trees are proposed “to accommodate the
development”. It is noted from a recent site inspection that a significant number of these
trees have already been felled, particularly towards the central and frontage areas of the
site. 
5.5. The submitted Tree Inspection Report also sets out the legal position with regard to trees
and wildlife, specifically in relation to bats and birds. The consultation response from the
Council’s Local Biodiversity Officer acknowledges this, but advises that the Report does
not provide advice on the timing for opening up the site for foundation construction with
reference to impact on birds. In order to address this issue, a planning condition is
recommended to require a pre-start ecological survey to be carried out in advance of
excavation works, if it is proposed to commence during the bird nesting season. 
5.6. In other respects, it is not considered that the individual trees to be removed are of high
biodiversity value and that removal of the trees proposed in the report will have an adverse
impact on the ecological condition of the area, based on the Tree Survey and Officers
inspection of the site. 
5.7. It is recommended that the Tree Protection Measures set out in the submission are
appropriate, and that any planning permission be subject to a condition requiring the
works to be carried out in accordance with these agreed protection measures during
construction n in accordance with BS standards – Trees and Construction. 
5.8. On the above basis it is considered that the proposal is in accordance with the provisions
of NPF4 Policy 6; Policy LDP 3; and SG LDP ENV 6. 
6. Road Network, Parking and Associated Transport Matters. 
6.1. Access to the site is directly from a cul-de-sac forming the upper end of Torwoodhill Road
at a point some 125 metres from the junction with Upper Torwoodhill Road. 
6.2. This cul-de-sac currently serves 5 houses. In addition, planning permission reference
20/01190/PP has been approved for a new detached 4-bedroom house within the
grounds of Torwood House (on a site adjacent to the west of the main access to Torwood
house) to the east of the current application site. This latter development has been
implemented and appears to be nearing completion. When occupied, this section of
Torwoodhill Road will therefore serve 6 no. existing dwellinghouses. 
6.3. From the access junction a private driveway will bend to the east and run up a steep bank
to the central part of the application site to a parking and turning area laid out in front of
the proposed house. Three car parking spaces are identified on the application drawings
on the paved parking/turning area and the top of the driveway. 
6.4. NPF4 Policy 13 generally aims to encourage, promote and facilitate developments that
prioritise alternative means of transport to car journeys and reduce the need to travel
unsustainably. The requirement to submit a Transport Assessment is introduced for some
developments however this relates to larger scale developments than the current
proposal for a single house. 
Page 95

Page 96

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
6.5. The elements of NPF 4 Policy 13 that are relative to the scale and nature of this
development are largely aligned with the provisions of Policy LDP 11 and associated SG
LDP TRAN 1 – 6. 
6.6. SG LDP TRAN 4 advises that acceptance of development using existing public and
private access regimes is subject to road safety and street design issues being
addressed. 
6.7. Where development proposals will significantly increase vehicular or pedestrian traffic on
substandard public approach roads, then SG LDP TRAN 5 requires that developments
contribute proportionally to improvements to an agreed section of the public network. 
6.8. The consultation response from Council Area Roads notes that Torwoodhill Road (past
its junction with Upper Torwoodhill Rd.) currently serves 6 no. properties and that it is
substandard to service an intensification of the existing level of use without an adverse
impact on road safety and the free-flow of traffic contrary to the provisions of Policy LDP
11 and SG LDP TRAN 4. 
6.9. Under the provisions of SG LDP TRAN 5, it is considered that improvement works to this
section of the public road network, commensurate to the scale and nature of the proposed
development, could improve the access road to a level where it can satisfactorily
accommodate the resultant intensification in traffic movements. It is advised that the
commensurate improvements should include the provision of 2 no. intervisible passing
spaces between the Upper Torwoodhill Road junction and the proposed new private
access to the application site. It is also noted that the formation of a ‘Service Bay’ access
arrangement at the junction of proposed private driveway and the public road could be
accepted as one of these two required passing spaces. 
6.10. The applicant has challenged the validity of this requirement on the basis that the
Council’s Area Roads did not consider that commensurate improvements to Torwoodhill
Road were required by the proposed development of 1 no. house as part of the
assessment of previous planning permission ref: 16/03045/PP. It is confirmed that this
planning permission was approved without any requirement for off-site improvements. 
6.11. Area Roads has responded that all previous relevant planning history has been taken
into account, including planning permission ref. 16/03045/PP, however any new
assessment of this proposal should give due consideration to up-dated guidance including
the National Roads Development Guidance (NRDG) and the Highway Code; and in doing
so, acknowledge the proposed intensification of use, the limited pedestrian step-off
available, the number of dwellings accessed from Torwoodhill Road and the available
carriageway width for bi-directional traffic. 
6.12. The agent has responded further that the applicant can create a large pull in area next
to the entrance to the right to allow vehicles to pull in including vans to allow passing for
vehicles. 
6.13.  On the basis of all of the information currently available, this fails to demonstrate that
the applicant can provide the off-site road improvements considered by the Area Roads
Engineer to be required in order to increase the capacity of the public approach road to
serve the proposed house. It is considered that the required improvements to comprise 2
no. intervisible passing spaces (one of which can be provided by means of a service bay
access) is commensurate with the scale and nature of the proposed development. 
6.14. On the basis that the applicant is unable to demonstrate that commensurate off-site
road improvements can be implemented under the provisions of Policy LDP 11 and SG
Page 96

Page 97

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
LDP TRAN 5, it is recommended that this application be refused on the basis that the
public approach road is unsuitable to accommodate a further intensification of traffic
without an adverse impact upon road traffic safety and the free flow of traffic contrary to
the provisions of Policy LDP 11; SG LDP TRAN 4 and NPF 13. 
6.15. SG LDP TRAN 6 generally serves to require that new development makes on-site
provision for parking and turning of vehicles in accordance with the adopted “Access and
Parking Standards.” 
6.16. The site layout drawing shows 3 no. car parking spaces, however Officers have
concerns that a vehicle parked in the space indicated at the top of the driveway could
block any other cars from turning within the site to ensure that vehicles can enter and
egress the site in a forward gear. It is considered however that the site has adequate
space to allow for adequate turning and parking, and if this application had been assessed
as acceptable with regard to all other material considerations, then this issue may be
addressed by means of a suspensive planning condition requiring submission and
approval of further layout details. 
7. Infrastructure 
7.1. Water supply and foul drainage is proposed to be by means of a connection to the existing
Scottish Water network. Notwithstanding objections relating to the capacity of the sewer
system, the consultation response from Scottish Water does not indicate any over-riding
capacity constraints to the system that would warrant an objection to the proposal, but
advises that further investigation may be required upon submission of a Pre-Development
Enquiry (PDE) by the applicant. On this basis, officers are satisfied in principle that there
are no known constraints in respect of public water and sewage infrastructure. 
7.2. The application forms state that the site is not within an area of known risk of flooding;
and advises that the applicant does not think that the proposal will increase flood risk
elsewhere. The curtilage of Torwood House, including the application site, is not overlain
by any recorded areas at risk to coastal, fluvial or surface water flooding with reference
to the SEPA Flood Map. 
7.3. The consultation response from Scottish Water specifically advises that a surface water
connection into its combined drainage system will not be accepted. The proposal is for
rainwater run-off from the proposed house to be by means of a soakaway indicated to the
east of the house. Aco drains are shown at various locations across and adjacent to the
driveway to void surface water discharge onto the public road adjacent to the south of the
site. 
7.4. It is proposed to manage surface water drainage by the installation of soakaway crates
wrapped with a permeable membrane allowing the rainwater and surface water run-off to
be collected and slowly soak back into the ground through an infiltration process in line
with the natural rate to avoid excessive water run-off. The driveway surfaces will be
permeable to allow natural run off into the ground; and four no aco drains to deal with any
excess water. SuDS to be designed and installed in accordance to BRE Digest 365
Soakaway Design and BSEN - 752-4. 
7.5. A significant number of local residents have submitted anecdotal accounts that surface
water currently runs off of the site onto falling levels of land adjacent to the south, including
Torwoodhill Road and Lovers Lane as well as existing residential properties on the
southern side of Torwoodhill Road. Third party representations submit that surface water
run-off from the site has increased as a result of the clearance of vegetation over the site.
Page 97

Page 98

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
It has also been submitted that the underlying ground conditions are not suitable for a
soakaway. 
7.6. Whilst the concerns raised by objectors are acknowledged, it is considered that the
revisions to the proposal gives sufficient information relating to the proposed surface
water drainage to demonstrate that this is not an over-riding constraint to development,
but a technical matter. It is further considered that these concerns can be properly
addressed by means of a suspensive planning condition requiring submission of full
details of the surface water drainage scheme design for assessment and written approval
prior to commencement of any development. This should include a geological site survey
and report demonstrating to the satisfaction of the planning authority that a
soakaway/ground filtration system is appropriate. The Council’s Flood Risk Assessor will
be consulted as part of this process. 
7.7. Subject to the above, it is considered that the proposal makes adequate provision for
services infrastructure in accordance with the provisions of NPF4 Policies 18, 20, 22, 23
and 24. LDP 10 and SG LDP SERV 1 – 7. 
Page 98

Page 99

Page 99

Page 100

This page is intentionally left blank

Page 101

Argyll and Bute Council
Development and Economic Growth   
PROPOSAL OF APPLICATION NOTICE (PAN)
____________________________________________________________________________  
Reference:  23/01276/PAN 
Applicant: Ylem Energy Ltd 
Proposal: Proposal of Application Notice for: Installation of 50Mw battery energy storage
system to balance the electricity network and facilitate renewable energy
deployment  
Site Address: Ardencaple Farm, Rhu, Helensburgh, Argyll and Bute
____________________________________________________________________________ 
1.0 INTRODUCTION 
This report informs the Planning Committee of the submission of a Proposal of Application
Notice (PAN). The submission of the PAN accords with the provisions of the Planning etc.
(Scotland) Act 2006 and was made valid on 14.08.23. The development which is subject
to the PAN is of a scale which will be an application to The Planning Authority as the
capacity of the storage facility will not exceed 50Mw in total capacity. (Above 50Mw would
require a Section 36 Application under the Electricity Act) 
The submitted information includes: 
 Proposal of Application Notice
 Location Plan
 Copy of newspaper adverts
 Community Consultation Presentation Dated 10.8.23 
The applicant has set out in detail their proposals to ensure sufficient opportunity is
provided for the community to view and comment on the proposals in advance of the
submission of a formal application. The applicants have confirmed in the PAN form that
the following consultation steps will be undertaken: 
 Consultation with Helensburgh Community Council
 Notification of the following Parties, 
Cllr Mark Irvine
Cllr Maurice Corry
Cllr S I Paterson
Jackie Baillie MSP
 Undertaking three community  consultation events 
 Advertising events within the Helensburgh Advertiser 
In addition to the above, the applicants have stated that they will write to all residents
within a 750m radius of the proposed site and put up posters in local shops and
community facilities. 
Page 101 Agenda Item 6

Page 102

Officers consider that the steps set out in the PAN are acceptable and in accordance with
the requirements of the Regulations to ensure appropriate community consultation is
undertaken. 
2.0  DESCRIPTION OF PROPOSED DEVELOPMENT 
The PAN provides notice of the developer’s intention to submit a planning application for
the erection and operation of a 50Mw battery storage facility.   The proposed compound
boundary comprises some 1.2 acres (120m x 40m). By means of general background the
applicants submit that: 
Battery Energy Storage Systems (“BESS”) are rechargeable batteries which are used to
store electricity imported from the grid at times of surplus. This power can come from
different sources, such as solar PV, during periods of excess supply or wind generation at
night when demand is low. This electricity is then discharged at times when there is
demand which exceeds supply....BESS sites are similar conceptually to reservoirs which
hold drinking water, or gas holders which store natural gas for heating. 
The applicants have submitted a copy of their community presentation of 10.8.23 which  
contains additional information on the proposals, and also an illustrative layout of a similar
facility to provide a general indication of the likely scale and appearance of the
development. This is available to view on the public access system.(Document 22986637) 
3 SITE DESCRIPTION 
The proposals will be located in a field north of the West Highland Railway Line and south
of existing high voltage overhead lines operated by Scottish Power. It is within the general
field patters of Ardencaple Farm located some 350m to the south east of the main
farmhouse buildings. 
The application site currently comprises part of a large field which appears to be used as
pasture land. A band of trees is located along the Western Boundary of the site and also
in the south eastern corner of the field. The applicants submit that the development is
approximately 300m from the nearest residential property. 
The site slopes from north to south from a high point of 100m AOD down to 75m AOD with
the application site being on the lower lying part of the site adjacent to the railway line
which forms the southern boundary of the site. 
For Members general information, the application site is located within the Green Belt. It
is not located within either the Duchess Woods or Highlandman’s Wood Local Nature
Conservation sites, which are located to the south, east and north of the proposed site. 
4 DEVELOPMENT PLAN POLICY 
In considering the merits of this PAN, a number of Development Plan Policy considerations
are relevant. The policies to be considered include: 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy
Page 102

Page 103

NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 - Energy
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety
NPF4 Policy 25 – Community Wealth Building 
Annex B – National Statements of Need
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll and Bute Local Development Plan adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our Environment
LDP 4 – Supporting the Sustainable Development of our Coastal Zone
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 6 – Supporting the Sustainable Growth of Renewables
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing our Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance 
SG LDP ENV 1 – Development Impact of Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 2 – Development Impact on European Sites
SG LDP ENV 4 – Development Impact on Sites of Special Scientific Interest (SSSIs) and
National Nature Reserves
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 14 – Landscape
SG LDP ENV 16(a) – Development Impact on Listed Buildings
SG LDP ENV 20 – Development Impact on Sites of Archaeological Importance
SG LDP PG 1 – Planning Gain
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable - Sustainable Siting and Design Principles
SG LDP SERV 5 – Waste Related Development and Waste Management 
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
Page 103

Page 104

These appear to be the most relevant policies. However this cannot be finalised until such
time as a formal application has been submitted and the details of the proposals finalised. 
Other Relevant Policy Considerations: 
Emerging Local Development Plan (LDP2) 
The emerging Local Development Plan (LDP2) will replace the current Local Development
Plan 2015, once adopted. On 13th June 2023, the Scottish Government’s Planning and
Environmental Appeals Divisions issued their Report of Examination on the Council’s
LDP2. At the time of writing this Pre-application report, the LDP 2015 remains the adopted
Local Development Plan, however, the Examination Report of the Draft LDP2 is a material
consideration of significant weight and may be used as such until the conclusion of the
LDP2 adoption process. (It is likely that this will form the statutory plan before the end of
2023 although this is subject to ongoing reporting to Members and adoption procedures). 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design: All Development
Policy 14 – Bad Neighbour Development
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic
Built Environment
Policy 18 – Enabling Development
Policy 21 – Sites of Archaeological Importance
Policy 22 – Economic Development
Policy 30 – The Sustainable Growth of Renewables
Policy 35 – Design of New and Existing, Public Roads and Private Access
Policy 36 – New Private Accesses
Policy 37 – Development Utilising an Existing Private Access or Existing Road
Policy 39 – Construction Standards for Private Access
Policy 48 – Developer Contributions
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 63 – Waste Related Development and Waste Management
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources
Policy 80 – Geodiversity 
 ABC Technical Note – Biodiversity (Feb 2017)
 UK Government’s Ten Point Plan for a Green Industrial Revolution (2020), 
 Energy White Paper (2020), 
 Carbon Plan (2011), 
 The UK Renewable Energy Roadmap (2011) (updated 2012 and 2013) and the
 British Energy Security Strategy
 Scotland’s Draft Energy Strategy and Just Transition Plan and the accompanying
Ministerial statement (Dated 10.1.23)
Page 104

Page 105

 The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
 Views of statutory and other consultees; 
 Planning history of the site 
 Legitimate public concern or support expressed on relevant planning matters 
5.0 POTENTIAL MATERIAL CONSIDERATIONS 
In respect of this proposal, it is considered that the following matters will be material
considerations in the determination of any future planning application: 
a)  LDP 2
b) National Energy Policy Objectives;
c) Economic Benefits;
d) Roads, Transport and Access;
e) Flood Risk, Water Quality and Drainage;
f) Peat and Soils;
g) Access and Recreation;
h) Natural Heritage and Biodiversity (including impact on designated sites);
i) Impact on Woodland;
j) Built and Cultural Heritage;
k) Design and Layout;
l) Landscape and Visual Impact (including cumulative impacts);
m) Noise and Vibration;
n) Telecommunications;
o) Construction Impacts;
p) Any other material considerations raised within representations. 
Members will note from the file that third party concerns/objections relating to the
proposals have been sent to the Planning Authority as part of the PAN Consultation
Process. For clarity, it is for the applicant to consider any concerns/objections at this stage
and demonstrate by means of a PAC report to accompany any future major planning
application how these matters have been considered. 
It is not for the Planning Authority to have regard to these matters at the current time as
no determination is sought on the merits of the proposal through the PAN process. Should
concerns or objections remain in relation to any future planning application they can be
submitted to the Planning Authority and considered at the appropriate time. 
6.0 CONCLUSION 
The report sets out the information submitted to date as part of the PAN. Summarised are
the policy considerations, against which any future planning application will most likely be
considered as well as potential material considerations and key issues based upon the
information received to date. The list is not exhaustive and further matters may arise as
and when a planning application is received and in the light of public representations and
consultation responses. 
7.0  RECOMMENDATION 
That Members note the content of the report and submissions and provide such feedback
as they consider appropriate in respect of this PAN to allow these matters to be considered
by the applicants in finalising any future application submission.
Page 105

Page 106

Author of Report: David Moore     Date: 05.09.2023 
Reviewing Officer: Peter Bain      Date: 05.09.2023 
Fergus Murray
Head of Development and Economic Growth 
Page 106

Page 107

Page 107

Page 108

This page is intentionally left blank

Page 109

Argyll and Bute Council
Development and Economic Growth   
PROPOSAL OF APPLICATION NOTICE (PAN)
____________________________________________________________________________   
Reference:  23/01581/PAN 
Applicant: Loch Long Salmon Limited 
Proposal: Proposal of application notice for the installation and operation of Lurignish Fish
Farm and associated infrastructure 
Site Address: Lurignish Fish Farm, Land Adjacent To Lurignish Farm, Appin
____________________________________________________________________________ 
1.0 INTRODUCTION 
Proposal of Application Notices only relate to National and Major Applications as defined
by the Government’s planning hierarchy and are a statutory requirement prior to the
submission of the planning application. The PAN heralds the start of a minimum 12 week
period to allow for community consultation before an application can be lodged. 
In considering this item, Members should restrict comments to issues relating to the
material considerations which may be relevant in the determination of the proposed
development and should refrain from expressing opinion as to the likely acceptability of
development in advance of any subsequent application being presented for determination.
Any opinions or views expressed by Councillors at the pre-application stage must be made
mindful of the overarching requirements of fairness, impartiality and of keeping an open
mind. The process provides opportunity for Officers to give feedback to the prospective
applicant on issues which Members would wish to see addressed within the planning
application submission. 
The submitted information includes:
 Proposal of Application Notice
 Location Plan 
The Proposal of Application Notice describes the proposed development as
“Installation and operation of Lurignish Fish Farm and associated infrastructure.  The
development would involve the construction and operation of a closed containment
at sea (often called semi-closed containment) fish farm and other related marine and
shore base structures, located approximately 0.5km west of Lurignish Farm” 
The applicant has confirmed the following consultation steps will be undertaken: 
a) Consultation letters to be sent to Appin Community Council, Duror and Kentallen
Community Council, Lismore Community Council and Ardgour Community Council.
b) Two public meetings will be held; one at Duror and Kentallen Community Centre on
14th September 2023 and one at Appin Village Hall on 24th October 2023.
Page 109 Agenda Item 7

Page 110

c) A press notices will be placed in the Oban Times and Edinburgh Gazette no later than
7th September 2023 for the first event and no later than 17th September for the second
public event. 
Officers consider that the steps set out in the PAN are acceptable. 
2.0 DESCRIPTION OF PROPOSED DEVELOPMENT 
Based on the description of the development contained within the proposal of application
notice, the forthcoming application is anticipated to comprise of the following 
 A semi closed containment marine fish farm;
 Supporting shore base with associated new access and landscaping.   
3.0 SITE DESCRIPTION 
The fish farm would be located in Loch Linnhe with the shore base element being located
off the A828 adjacent to the marine element at Lurignish which is located north of Shuna
Island and the settlement of Appin.  The terrestrial site is located within a countryside zone
within an area designated as an Area of Panoramic Quality.  The Lynn of Lorn National
Scenic Area lies approximately 1.4km to the south of the proposed development. 
4.0 DEVELOPMENT PLAN POLICY 
This is not a planning application and therefore does not require evaluating and
determining in accordance with Section 25 of the Planning Act against the Development
Plan and its policies. However, in considering the merits of this PAN, a number of
Development Plan Policy considerations are relevant. The policies to be considered
include: 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 10 – Coastal Development
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 26 – Business and Industry
NPF4 Policy 29 – Rural Development 
Page 110

Page 111

Argyll and Bute Local Development Plan adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our Environment
LDP 4 – Supporting the Sustainable Development of our Coastal Zone
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 8 – Supporting the Strength of Our Communities
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising Our Resources and Reducing Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance 
SG LDP ENV 1 – Development Impact of Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 2 – Development Impact on European Sites
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 12 – Development Impact on National Scenic Areas (NSAs)
SG LDP ENV 13 – Development Impact on Areas of Panoramic Quality (APQs)
SG LDP ACE 1 – Area Capacity Evaluation
SG LDP ENV 16(a) – Development Impact on Listed Buildings
SG LDP ENV 19 - Development Impact on Scheduled Ancient Monuments
SG LDP SERV 5(b) – Provision of Waste Storage and Collection Facilities within New
Development
SG LDP BUS 2 – Business and Industry Proposals in the Countryside Development
Management Zones
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable - Sustainable Siting and Design Principles
SG LDP SERV 1 – Private Sewerage Treatment Plants and Wastewater (i.e. drainage)
systems
SG LDP SERV 3 – Drainage Impact Assessment (DIA)
SG LDP SERV 5(b) – Provision of Waste Storage and Collection Facilities within New
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP Sust Check – Sustainability Checklist
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 5 – Off-Site Highway Improvements
SG LDP TRAN 6 –Vehicle Parking Provision 
SG LDP CST 1  - Coastal Development
SG LDP AQUA 1 – Aquaculture Development
Annex A – Planning Process for Aquaculture Development
Annex B – Council Adopted Marine and Coastal Plans
Annex C – Responsibilities of Statutory Authorities in Relation to Aquaculture
Development
Annex D – Marine Planning Area for Aquaculture Development 
Emerging Local Development Plan (LDP2) 
Page 111

Page 112

The emerging Local Development Plan (LDP2) will replace the current Local Development
Plan 2015, once adopted. On 13th June 2023, the Scottish Government’s Planning and
Environmental Appeals Divisions issued their Report of Examination on the Council’s
LDP2. At the time of writing this Pre-application report, the LDP 2015 remains the adopted
Local Development Plan, however, the Examination Report of the Draft LDP2 is a material
consideration of significant weight and may be used as such until the conclusion of the
LDP2 adoption process. 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design: All Development
Policy 14 – Bad Neighbour Development
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance
Policy 22 – Economic Development
Policy 28 – Supporting Sustainable Aquatic and Coastal Development
Policy 32 – Active Travel
Policy 35 – Design of New and Existing, Public Roads and Private Access
Policy 36 – New Private Accesses
Policy 39 – Construction Standards for Private Access
Policy 40 – Vehicle Parking Provision
Policy 41 – Off Site Highway Improvements
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Drainage Systems (Suds)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
Other Relevant Policy Considerations: 
 ABC Technical Note – Biodiversity (Feb 2017) 
 Marine Planning Policy
As part of the proposed development extends into the marine environment, the Council as
a public body is required to take authorisation decisions in accordance with the National
Marine Plan (NMP), unless relevant considerations indicate otherwise. 
The proposal must also be considered against the Marine Planning Policies of the National
Marine Plan. 
5.0 POTENTIAL MATERIAL CONSIDERATIONS 
In respect of this proposal, it is considered that the following matters will be material
considerations in the determination of any future planning application:
Page 112

Page 113

 Landscape, seascape and visual issues;
 Benthic Impact;
 Water Quality;
 Wild Fish Interactions;
 Impacts on natural, built and / or historic or archaeological sites and their settings;
 Impacts on designated sites, habitats and species;
 Traffic and transport;
 Amenity impacts (waste, noise, light and odour); 
 Impacts on commercial and recreational acivity;
 Public access;
 Economic Impact. 
6.0 CONCLUSION 
The report sets out the information submitted to date as part of the PAN. Summarised are
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date. The list is not exhaustive and further matters may arise as and when a
planning application is received and in the light of public representations and consultation
responses. 
7.0  RECOMMENDATION 
That Members note the content of the report and submissions and provide such feedback
as they consider appropriate in respect of this PAN to allow these matters to be considered
by the applicants in finalising any future planning application submission. 
Author of Report: Sandra Davies     Date: 
Reviewing Officer: Peter Bain     Date: 7 September 2023 
Fergus Murray
Head of Development and Economic Growth 
Page 113

Page 114

This page is intentionally left blank

Page 115

Page 115

Page 116

This page is intentionally left blank

Page 117

ARGYLL AND BUTE COUNCIL     PPSL COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH  20 September 2023 
Planning Policy Response to Argyll and Bute’s Declared Housing Emergency 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an over view of some of the potential planning policy
responses in recognition of the housing emergency which was declared at the
Environment Development and Infrastructure committee in June 2023.
1.2 There are many factors which contribute to the housing emergency in Argyll
and Bute including social, economic, geography and demographics.  This paper
examines areas where land use planning policies may have some effect to help
address imbalances in the local housing system that may have contributed to the
housing emergency.  These are; the growth in the use of residential
accommodation to provide short term let holiday accommodation; the use of
houses as second homes and the application of current development plan
housing policies to meet local housing needs including homes for primary
occupancy, and the provision of affordable housing and housing for key workers. 
1.3 This paper recommends that the Council explores the introduction of planning
short term let control area/s,  as part of the housing event to be held in November
2023, and subsequently a further report for consideration by PPSL Committee
outlining the preferred options. 
1.4 National Planning Framework 4 provides greater policy emphasis on local
solutions to ensure new homes within the region are delivered to meet the
identified local housing needs; and in some areas to offset the impact of second
homes and short term lets. In order to inform the application of these policies to
ensure that new homes meet identified local housing needs, it is proposed that a
technical note be prepared to accompany the Proposed Local Development Plan
(LDP 2) when adopted.
1.5 It is proposed that the existing supplementary guidance on affordable housing is
reviewed as a LDP2 Technical Note.  This will seek to ensure all forms of
affordable housing is used as such in perpetuity; and further explore the role which
housing for key workers may have in meeting affordable housing requirements to
Page 117 Agenda Item 8

Page 118

enable local industry to expand, and attract economically active population to our
area.
RECOMMENDATION
1.6 It is recommended that Members: 
i)  Note and endorse the content of the report; 
ii) Agree to explore the options for designating a short-term let control
area/s for all, or parts of, the planning authority’s area and report
findings back to PPSL.  
Iii) Agree that Officers prepare a draft Technical Planning Note in
support of NPF4 and LDP2, providing updated guidance on
affordable housing delivery including its retention in perpetuity and
accommodating key workers for consideration by Members.
iv) Agree that Officers prepare a draft Technical Note in support of
NPF4, and LDP2, that will provide guidance on how we ensure
housing is delivered to meet the local housing need as identified by
the Housing Needs Demand Analysis (HNDA), including potential
occupancy restrictions for consideration by Members. 
Page 118

Page 119

ARGYLL AND BUTE COUNCIL       PPSL COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH  20 September 2023 
Planning Policy Response to Argyll and Bute’s Declared Housing Emergency 
2.0 INTRODUCTION 
2.1 The Argyll and Bute Local Development Plan 2 (LDP) identifies that the central
challenge facing Argyll and Bute is the delivery of sustainable long-term economic
growth to support the retention and growth of our population. One of the key aims
of the LDP is to support the provision of a range of homes that meets the existing
and future needs of all our communities through the identification and delivery of
allocations for housing together with a flexible policy framework that encourages
new homes constructed in appropriate, deliverable, and sustainable locations. 
This includes the availability of a range of homes for local people and for those
who wish to move to the area to take up employment opportunities. It is clear that
the availability of affordable, principle homes in the area makes an important
contribution to the sustainability of communities, local services, and the local
economy.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members: 
i)  Note and endorse the content of the report; 
ii) Agree to explore the options for designating a short-term let control
area/s for all, or parts of, the planning authority’s area and report
findings back to PPSL.  
Iii) Agree that Officers prepare a draft Technical Planning Note in
support of NPF4 and LDP2, providing updated guidance on
Page 119

Page 120

affordable housing delivery including its retention in perpetuity and
accommodating key workers for consideration by Members.
iv) Agree that officers prepare a draft Technical Note in support of
NPF4, and LDP2,that will provide guidance on how we ensure
housing is delivered to meet the local housing need as identified by
the Housing Needs Demand Analysis (HNDA), including potential
occupancy restrictions for consideration by Members.  
4. 0 DETAIL 
4.1 The issue of second homes and the loss of residential accommodation to short
term lets is not a new one to Argyll and Bute.  In fact, it forms an important
contribution to economic activity in our area. However, the growth of on-line
platforms for short term lets, has raised the profile of this type of
accommodation, and made it easier for owners of second homes, and just as
importantly privately owned rental accommodation, to offer their properties for
short term let while they are not using them.   
Page 120

Page 121

4.2 This national trend has contributed to the shortage of available
accommodation for use as people’s primary home. This makes it harder to
retain economically active people in the places they grew up, as well as
harder to attract people to live and work in the area.  Consequently, there is a
strain on the sustainability of local services and a brake on growing our
economy that is becoming increasingly supported by available evidence. An
August 2023 survey by MICHT of just 8 companies indicated un-met
accommodation demand for 15 worker households who are needed to support
their businesses, and this is over and above the accommodation those
businesses are already procuring themselves on behalf of their workers. 
4.3 That said, at the same time, tourism is extremely important to Argyll and Bute. 
A recent article by the Office for National Statistics shows that Argyll and Bute
comes 9th in the list of tourism hotspots preceded only by 6 London boroughs,
the Isles of Scilly, and South Lakeland. 
4.4 Whilst it is recognised that tourism makes an important contribution to the Argyll
and Bute economy, a balance has to be struck, in order to ensure that there are
enough people who can live locally in order to provide vital services upon which
we rely.  It is also important in terms of stabilising and growing the population.
There are numerous communities across Argyll and Bute where the availability
of homes is very limited and has been reduced further by the higher than
average levels of second homes, short terms lets, and vacant properties.  
PLANNING CONTROL AREA/S CONSULTATION
4.5 At a national level the Scottish Government has responded to concerns over the
growth of  short term lets by introducing regulations to establish a licencing regime
for short term lets, and by amending the Planning (Scotland) Act 2019 to enable
Planning Authorities to establish Short Term Let Control Areas, for all, or parts of,
their area. 
4.6 In terms of Air B+B (single brand), analysis of their website in January 2023
revealed that the just over 2,000 properties were available in Argyll and Bute as
follows (NB: this is a snap shot figure that varies over time).  This figure will not
include more traditionally offered holiday accommodation such as hotels. 
Islay Jura Colonsay 172
Coll Tiree 35
Mull Iona 212
Kintyre 111
Mid Argyll 159
Bute 146
Cowal 360
Helen/Lomond 203
Lorn 673   
A&B                     2,071
Page 121

Page 122

4.7 A number of short term let control areas have already been introduced by other
authorities. Edinburgh City Council has introduced a single control area that
covers the whole of the City. Highland has introduced a short term let control area
in its Baddenoch and Strathspey ward (which covers the Aviemore and Grantown
on Spey area).  In Argyll and Bute there may be a number of options regarding
short term let controls, this could include a single area covering the whole of the
planning authority area, or by identifying those communities where there may be
particular pressure on housing supply on a housing market area basis.  
4.8 The designation of a short term let control area is not a ban on short term lets,
but will mean that planning permission will always be required for a change of
use to a short term let.  This will allow the planning authority to assess the
application against LDP policy and for communities and individuals to make
representations as part of the planning application process.   It should be noted
that all existing short term lets are required to apply for a license by 1st October
2023.
4.9 The licensing information will help inform more detailed consideration of the
introduction of planning short term let control area or areas, with further evidence
gathering and workshops considered as part of the housing summit to be held in
November 2023.  Following this, a further report will be prepared for consideration
by PPSL Committee outlining the preferred options and the next steps in the
formal designation procedures including submission to Scottish Ministers. 
REQUIRMENT FOR HOMES FOR PRIMARY OCCUPANCY
4.10 National Planning Framework 4 (NPF4) was published in February 2023 and is
now part of the development plan for Argyll and Bute. Planning applications
require to be determined in accordance with all parts of the development plan
unless material considerations dictate otherwise.  National Planning Framework
4 includes policies on Quality Homes, Rural Homes and Tourism.  These policies
place greater emphasis on:
 ensuring new homes on land allocated for housing are delivered; and
 demonstrating how they take account of identified local housing needs. 
4.11 NPF4 recognises that "There is a clear need for affordable housing provision
across the region to improve choice and access to homes, to support local
economies, and in some areas to help offset the impact of second home
ownership and short term lets on the market. Local solutions may include key
worker housing, temporary homes for workers in remote areas, and self-provided
homes including self-build and custom-build “(the region in this case being the
North West Coast and Islands - which includes the Council's area). 
4.12 NPF4 also states that “Demand for development, including in pressured areas,
will require a planned response to minimise the impact of second homes on local
communities and ensure new homes are affordable and meet local needs"
Page 122

Page 123

4.13 There is a clear emphasis in NPF4 on the identification of Local Solutions.  Both
the NPF4 and the Argyll and Bute Local Development Plan 2 policies in relation
to housing, and the loss of existing accommodation to tourist accommodation
require to be taken into account.  In applying these in the context of the
development plan as a whole, the Scottish Government’s housing policy and the
Council’s now declared housing emergency, a more rigorous approach to
securing housing to meet identified local housing requirements is justified.  In
order to inform the application of these policies to ensure that new homes meet
identified local housing needs, and the loss of residential accommodation is taken
in to consideration in relation to changes of use, it is proposed that a technical
note be prepared to accompany the Local Development Plan 2 when adopted.
4.14 The Local Development Plan 2 (LDP 2) contains housing allocations in order to
meet the local housing needs and demands which have been established in the
Housing Need and Demand Assessment (HNDA).   The HNDA provides the
evidence base for the Local Housing Strategy and is used to calculate the Local
Housing Land Requirement for the Local Development Plan 2.  The HNDA does
not assess the need for tourism accommodation, neither holiday lets nor second
homes.  It identifies the need for homes for those who wish to live and work within
Argyll and Bute as their primary residence. Following the examination of LDP2
the reporters have confirmed that the Local Housing Land Requirement has been
set at 3,000 units up to 2030, and a supply of housing allocations has been
identified to meet that requirement. It is clear that the LDP2 identified land supply
is intended to provide homes for primary occupancy for people who wish to live
and work within the Area, not for second homes or holiday lets.
4.15 Reflecting this Policy 65 of LDP 2 contains a presumption against development
other than housing, on land identified as a housing allocation unless it can be
demonstrated that it will not result in a shortfall in housing land supply and
significant positive environmental, economic or social benefits can be
demonstrated. It is important to clarify that second homes and holiday letting are
not considered “housing” under the terms of this policy.
4.16 It is proposed to draft a Technical Note for PPSL approval, which will set out how
the new NPF4 and LDP2 polices will be applied in terms of the development of
land for housing to meet the housing land requirement.  Specifically the technical
note will set out proposals to ensure that such new homes are meeting the
identified local housing need by requiring that they are occupied as primary
residences and remain as such in perpetuity.  This is likely to be achieved by a
S75 agreement, or a Rural Housing Authority Burden.  Should subsequent
property owners wish to change that restriction they would need to make an
application to the Council to achieve that. It would then be open to the Council to
approve or refuse the application.  Again, this issue will be consulted on prior to
reverting to PPSL.
REVISIONS TO AFFORDABLE HOUSING GUIDANCE
4.17 The Supplementary Guidance on the delivery of affordable housing which
accompanies the 2015 Adopted Local Development Plan was approved in 2016
Page 123

Page 124

and is now out of date and will be reviewed as part of the suite of Technical Notes
that will support LDP2. 
Monitoring the provision of affordable housing since the approval of the
Supplementary Guidance in 2016 indicates:
 the majority of affordable housing has been provided by Registered Social
Landlords, 
 there have been limited commuted payments; and
 a number of schemes where properties have been described as affordable
by design or affordable in the market.  
4.18 Some affordable properties delivered for ownership have subsequently been re-
sold, and there is need to ensure that all types of affordable housing remain
available for use as affordable housing in perpetuity.   In addition, it is important
to ensure that all types and tenures of affordable home remain in use as primary
residences and are not lost to second homes or holiday letting.  Mechanisms to
deliver this will be included in the review.  
4.19 Another issue which has emerged in recent years is that of housing for key
workers including the provision of accommodation by employers, and how this
should be treated in relation to affordable housing.  This is an issue that Scottish
Government have requested to be included within the Strategic Housing
Investment Plan going forwards.
4.20 Guidance on all these issues will be developed and included in the Technical
Planning Notes that will accompany LDP 2.
5.0 CONCLUSION
5.1 In response to the Council’s declared housing emergency there are a number of
ways in which the land use planning system and specifically the development plan
policy can assist.  In relation to development plan policy, further guidance can be
developed and included in Technical Planning Notes to explain how the LDP
policies relevant to the provision of homes for people will be applied.  This will
include making clear that housing is intended to provide homes for people to use
as primary residences, that affordable housing is to be provided in perpetuity and
the role which key worker or employer provided housing may play in the provision
of affordable housing.     
5.2 Argyll and Bute Council, as a Planning Authority, has the ability to pursue the
designation of a short term let control area(s) for all or parts of their area.  Further
work will be carried out to establish the pattern and distribution of short term lets
once the requirement for existing operators to apply by 1st October 2023 has
passed.  This data will further inform the housing workshops held later in
November 2023.  Notwithstanding all of the above, there is also a need to
recognise the importance of tourism and the provision of visitor accommodation
to the Argyll and Bute economy.   
Page 124

Page 125

6.0 IMPLICATIONS
6.1 Policy   
The proposals are consistent with current Council priorities including the
Outcome Improvement Plan, Local Housing Strategy and Local Development
Plan and NPF4 which forms part of the Argyll and Bute Development Plan..
6.2 Financial – None.  
6.3  Legal  - None at this stage. 
6.4  HR None
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - 
6.5.2   Socio-economic Duty – 
6.5.3  Islands - 
6.6 Climate Change 
Making most effective use of existing buildings and existing housing stock helps
reduce carbon inputs and provides for more sustainable communities. 
6.7 Risk   
Failure to follow the statutory process regarding the designation of a short term
let control areas correctly may open the council to legal challenge.   
6.8  Customer Service 
None. 
Kirsty Flannagan
Executive Director with responsibility for Development and Economic Growth
Policy Lead Cllr Kieron Green
23 August 2023                                                  
For further information contact: Mark Lodge, 01546 604280 
Page 125

Page 126

This page is intentionally left blank

Page 127

ARGYLL AND BUTE COUNCIL
DEVELOPMENT AND ECONOMIC
GROWTH 
PPSL COMMITTEE 
20 SEPTEMBER 2023 
OCCUPATIONAL HEALTH AND SAFETY LAW ENFORCEMENT PLAN 2023-2025 
1.0 Executive Summary   
1.1 The Council, as the “enforcing authority” under the Health and
Safety at Work etc. Act 1974, is required formally to approve an
Occupational Health and Safety Law Enforcement Work Plan under
the statutory National Local Authority Enforcement Code. The paper
presents the 2023-25 Work Plan and Enforcement Policy for
Committee approval.   
1.2 We live in a society where we expect to be safe at work, be able to 
shop at businesses which do not put a significant hazard to us, and
to a range of facilities, for leisure and other purposes, which we can
enjoy safely.  The Health and Safety at Work Act etc.1974 provides
for this, but these standards can only be achieved, maintained and
improved, through the work of the Health and Safety Executive
(hereafter referred to as HSE) and Local Authorities, who enforce
the provisions of the Act.   
1.3 The Planning, Protective Services and Planning Committee approved
the Regulatory Services Work Plan 2023-25 on the 21 June 2023. This
overarching plan covered the wide range of priorities across
Regulatory Services, included the statutory health and safety
enforcement role carried out by environmental health. The
Occupational Health and Safety Work Plan 2023-23 provides more
detail   
1.4 Recommendations 
1.4.1 Members are asked to recognise the work by environmental health
to secure standards of health and safety across businesses in Argyll
and Bute. This directly protects employee and others (e.g. members
of the public etc.), supports business and indirectly supports the
wider economy   
1.4.2 To approve the Occupational Health and Safety Law Enforcement
Workplan 2023-25 and enforcement policy to be implemented by
Regulatory Services. 
Page 127 Agenda Item 9

Page 128

ARGYLL AND BUTE COUNCIL
DEVELOPMENT AND ECONOMIC
GROWTH 
PPSL COMMITTEE 
20 SEPTEMBER 2023 
OCCUPATIONAL HEALTH AND SAFETY LAW ENFORCEMENT PLAN 2023/25 
2.0 INTRODUCTION   
2.1 The Council, as the “enforcing authority” under the Health and Safety
at Work etc. Act 1974, is required formally to approve an Occupational
Health and Safety Law Enforcement Work Plan under the statutory
National Local Authority Enforcement Code. The paper presents the
2023-25 Work Plan and Enforcement Policy for Committee approval.   
2.2 Like other health protection activities, this work going largely un-noticed,
but seeks to protect society’s expectations to be safe at work, be able
to shop at businesses which do not pose a significant hazard, and to
safely use a range of facilities, for leisure and other purposes. The
regulatory work undertaken by environmental health officers through
this plan aims to achieve this level of expectation of protection.   
3.0 RECOMMENDATIONS   
3.1 Members are asked to recognise the work by environmental health to
secure standards of health and safety across businesses in Argyll and
Bute. This directly protects employee and others (e.g. members of the
public etc.), supports business and indirectly supports the wider
economy.   
3.2 To approve the Occupational Health and Safety Law Enforcement
Workplan 2023-25 and enforcement policy to be implemented by
Regulatory Services.   
4.0 SUMMARY OF ACTIONS FROM 2020-22 WORK PLAN   
4.1 Argyll and Bute Council is an enforcing authority for the Health and
Safety at Work etc. Act 1974 and regulations made thereunder. In
Great Britain, enforcement of the 1974 Act is generally divided the
Health and Safety Executive (HSE) and local authorities. HSE is
responsible for workplaces including factories, farms, building sites,
schools, hospitals, and offshore installations. The Council covers
businesses including offices, shops, hotels, leisure premises,
caterers, nurseries, and clubs. In Argyll and Bute, the Environmental
Health team have responsibility for health and safety law enforcement
in over 3,500 premises.   
Page 128

Page 129

4.2 Section 18 of the 1974 Act provides that HSE can issue guidance to
direct how local authorities plan their priorities and target their
interventions, enabling them to meet the requirements of the
National Local Authority Enforcement Code. The Code and
guidance are strongly influenced by the UK Government’s view that
inspection and regulation activities are a burden on business and
should only be used when alternative methods of securing
compliance are inappropriate. Therefore, the routine inspection of
workplaces across England, Scotland and Wales has effectively
ceased. 
HSE’s guidance is published as local authority circular LAC 67/2 and
is revised each year. The 2023 revision, version 12, has been used
to develop the Occupational Health and Safety Law Enforcement
Plan 2023-2025, and which is appended to this report.   
4.3 The Planning, Protective Services and Planning Committee approved
the Regulatory Services Work Plan 2023-25 on the 21 June 2023. This
overarching plan covered the wide range of priorities across
Regulatory Services, included the statutory health and safety
enforcement role carried out by environmental health. The
Occupational Health and Safety Work Plan 2023-23 provides more
detail.   
4.4 The following summarises the health and safety enforcement work
over the last plan period and the outcome of investigations that were
completed in that period. 
1. Loch Awe Boats   The death of Kieran Cowan on Loch Awe
on 17th August 2019 arose when three young men were hired
a defective boat, without proper safety equipment, in stormy
weather, by a licensed boat hire operator. The incident was
investigated jointly with Police Scotland under the direction of
the Crown Office. A report was submitted following that
investigation, which resulted in Clifford Davies and Janet
Lightbown, the operators of Loch Awe Boats, pleading guilty
to a charge under section 3(1) of the 1974 Act and to causing
the death of Kieran Cowan. The case was heard at Oban
Sheriff Court on 10th January and the business was fined
£10,000. 
2. Fiscal warning – work equipment in catering. An incident
in 2018, in which a young person working in a catering
establishment was injured when using a domestic food
processer, resulted in a Fiscal warning for a non-causative
breach of the Provision and Use of Work Equipment
Regulations 1998. That warning has now expired. 
3. Other investigations 
a. An incident in which a worker was injured in a workplace
transport accident was investigated and a report has
been submitted to the Crown Officer Procurator Fiscal
Service. 
b. An incident in which a worker was injured handling
equipment at work was investigated and disposed of by
means of a Fiscal Warning.
Page 129

Page 130

c. Two other serious incidents are currently under
investigation with a view to reports to the Crown Office
Procurator Fiscal Service.     
4. Accident reports 
a. The local authority receives statutory reports of injuries,
diseases, and dangerous occurrences from workplaces
which fall to it for enforcement. The service has
procedures for screening which incidents are to be
investigated, according to HSE guidance. 
b. In the year 2022-2023, 49 RIDDOR reports were
received. Five were selected for investigation. One of
these was the workplace transport incident which
resulted in a report to the Crown Office Procurator Fiscal
Service. 
c. In first quarter of the year 2023-2024, 11 RIDDOR
reports were received. Two were selected for
investigation. One investigation is ongoing. 
5. Summary of enforcement actions 
a. Enforcement actions can arise from proactive
inspections or from reactive work such as investigating
incidents. Inspectors may also come across unsafe
conditions for workers and the public when conducting
other site inspections. Inspectors will always deal with
unsafe conditions when they find them, and
interventions range from giving advice to formal
enforcement notices. 
b. In the year 2022-2023, 5 immediate prohibition notices
and 10 improvement notices were served. 
c. In the first quarter of the year 2023-2024, 2 improvement
notices were served. 
d. Prohibition notices were served for unsafe gas
installations, unsafe electrical installations, and unsafe
asbestos materials 
e. Improvement notices were served for failure to maintain
gas installations, absence of suitable and sufficient risk
assessments, absence of Legionella controls in
premises, failure to implement risk assessments in
respect of workplace transport. 
6. Guest safety in short-term lets accommodation 
Guest safety conditions were proposed for the short-term lets
licensing scheme based on known topics which had given rise
to evident concern in the holiday let sector in the past. It is
anticipated that the requirement for hosts to comply with
specific licensing conditions will ensure safer conditions for
guests and enable hosts more easily to identify and comply
with their duties under health and safety law. 
Page 130

Page 131

7. Co-ordination with other regulators 
The Lead EHO (Health and Safety) participates in regional
and national groups to share information and practice with
other local authority regulators. These groups include, the
West of Scotland Health and Safety Liaison Group, for which
the Council provides the secretarial function, and the Royal
Environmental Health Institute of Scotland’s Health and Safety
Co-ordination Group. 
8. Expert Advice Group   
The ETC19 group was established to co-ordinate the local
authority regulatory response during the period of restrictions
at the start of the COVID pandemic. Argyll and Bute Council
have had representation on this group from the foundation of
the group. The group has established very good working
relationships with Scottish Government officials, and in liaison
with HSE and Police Scotland. The group continues in
existence as a forum for discussing regulatory matters of
interest to environmental health and trading standards
colleagues. 
9. The Lead EHO (Health and Safety) also served on two
Scottish Government short-life working groups, the
Ventilation and Adaptations groups. His role was to
represent the local authority environmental health
perspective. 
5.0 CHALLENGES   
5.1 The local authority health and safety regulatory role continues to be
under pressure, primarily of staffing and secondarily of other
operational demands on environmental health functions. Inspectors
are, except for the Lead EHO (Health and Safety), generalist and
have responsibilities for food control, licensing, and public health
duties in addition to their health and safety function. Conversely, the
demands of staffing reactive investigations into serious health and
safety incidents affects the delivery of other environmental health
functions. The Occupational Health and Safety Law Enforcement
Plan 2023-2025 is written with these constraints in mind, and with
the need to maintain the competence of Environmental Health
Officers who are not specialist health and safety inspectors. 
6.0 OCCUPATIONAL HEALTH AND SAFETY 
ENFORCEMENT PLAN 2023-25   
6.1 The 2023-25 work plan has been developed having regard to
national and local priorities, our available resource and meets the
requirements of the National Code.   
6.2 Our priorities are detailed in APPENDIX 1 of this report which is
attached as an appendix to this report. 
In summary, this focuses on high risk activities, responding to
service requests and reported accidents/incidents; assessing
Page 131

Page 132

compliance with certificates issued in respect of petroleum sites,
and targets the following national and local initiatives:- 
(a) National   
O
O
O
O
Construction safety
Falls from height
Health risks from respirable silica dust
Duty to manage asbestos   
O
O
O
O
O
O
Visitor attractions to prevent or control ill-health arising
from animal contact
Beverage gases in the hospitality sector
Gas safety in commercial catering premises
Welfare provision for delivery drivers
Raising awareness of the need to prevent injury to
members of the public from accessing large commercial
waste and recycling bins
Promoting worker involvement in safety management
systems 
(b) Local Priorities   
O
O
Public and worker safety at events
Legionella control in hot tubs and spa pools 
6.3 We will continue to monitor accident and injury rates across all
employment sectors in Argyll and Bute and develop intelligence-
based targeting methods for ensuring that our regulatory
interventions address risk and deliver safer, healthier working
conditions for the people of Argyll and Bute.   
7.0 ENFORCEMENT POLICY   
7.1 Our enforcement policy seeks to achieve compliance through
appropriate, proportionate and risk-based regulates, and ideally
through working with business.   
7.2 The 1974 Act provides formal enforcement powers which are used
by authorised inspectors where they identify a significant risk to
health or safety; where there is a history of non-compliance, where
the informal approach working with business is unsuccessful, and
will be considered in the event to any major or significant incident or
injury to employee. Reports will be made to the Procurator Fiscal in
cases of serious breach of duty, significant risk or serious harm to
employees or the public, or failure to comply with formal
enforcement notices.   
7.3 The Occupational Health and Safety Law Enforcement Policy (see
Appendix II) has been reviewed and is presented for approval. It
meet the requirements of the National Code, the Scottish regulators’
strategic code of practice and the Council’s Enforcement Policy.
There are no changes to the policy previously approved by
Committee. 
Page 132

Page 133

8.0 CONCLUSIONS   
8.1 Argyll and Bute Council’s Environmental Health team continues to
provide a competent and flexible enforcement team for health and
safety matters, although resourcing requires it to be targeted and
reactive in nature 
This report sets out the priorities of Regulatory Services to continue
to protect citizen and worker health and safety through a considered,
proportionate, work plan, always acknowledging that significant
investigations might require to be resourced at any time. 
9.0 IMPLICATIONS   
9.1 Policy Meets the National Code and the Regulatory
Performance Agenda 
9.2 Finance None.  Plan has been developed to reflect
existing budget and  available resources. 
9.3 Legal Meets our statutory duties as an “enforcing
authority” 
9.4 HR None 
9.5 Fairer Scotland 
9.5.1 Equalities None 
9.5.2 Socio-economic None 
9.5.3 Islands None 
9.5.4 Climate change None 
9.6 Equalities None 
9.7 Risk The major risks are lack of available resource
and competing operational priorities.  These
are being managed. 
9.8 Customer Service None 
Executive Director with responsibility for
Environmental Health:
Kirsty Flanagan
Policy Lead: Councillor Kieron Green 
For further information contact: Alan Morrison, Regulatory Services and Building
Standards Manager (Alan.Morrison@argyll-bute.gov.uk    01546 604292) 
Appendix 1:  Occupational Health and Safety Law Enforcement Work Plan 2023-25
Priorities
Appendix 2 Argyll and Bute Council Occupational Health and Safety Law Enforcement
Policy 
Page 133

Page 134

APPENDIX 1: Occupational Health and Safety 
Law Enforcement Plan 2023-2025 
Summary 
The following areas of work are proposed for the period 2023-2025. 
National Priorities 
1. Building safety – duty to manage asbestos/falls through fragile surfaces/
respirable silica dust. 
Actions : Raising of awareness in routine contacts and intervention on complaint
or MECs. 
Resource: Inspectors having routine contact with businesses for other regulatory
functions. 
2. Visitor attractions to prevent or control ill health arising from animal contact. 
Actions : Proactive inspection of the small number of sites in Argyll and Bute. 
Resource: Lead EHO. 
3. Inflatable amusement devices. 
Actions : Proactive inspection when found to be in use. Imposition of safety
requirements through event licensing processes. Provision of information on the
council’s website. 
Resource: Area inspectors. 
4. Gas safety in catering premises. 
Actions : Providing advice to new businesses, checking currency of records during
routine visits, responding to complaints and MECs. 
Resource: Inspectors having routine contact with businesses for other regulatory
functions. 
5. Electrical safety in hospitality settings. 
Actions : Raising of awareness during routine visits to hospitality settings,
responding to complaints and MECs. 
Resource: Inspectors having routine contact with businesses for other regulatory
functions. 
6. Spa pools and hot tubs on display. 
Actions : Providing information to retailers about the actions required to be taken
to prevent outbreaks of Legionnaires’ disease. 
Resource: Lead EHO. 
7. Welfare provision for delivery drivers. 
Actions : Raising of awareness during routine visits to restaurants and takeaway
premises, responding to complaints and MECs. 
Resource: Inspectors having routine contact with businesses for other regulatory
functions. 
8. Promoting worker involvement in safety management systems. 
Actions : Engaging with worker representatives during proactive inspections or
responding to complaints/MECs. 
Page 134

Page 135

Resource: Inspectors undertaking proactive inspections or responding to
complaints/MECs. 
Local Priorities 
9. Spa pools in commercial use. 
Actions : Proactive engagement with operators when identified and through
short-term lets licensing consultations, proactive inspections, responding to
complaints. 
Resource: Lead EHO 
10. Bather safety in public swimming pools. 
Actions : Proactive inspections of public swimming pools focussing on lifeguarding
or emergency response arrangements, according to the risk presented to bathers. 
Resource: Lead EHO and inspectors. 
These topics have been identified from reviewing the 12th edition of LAC67/2 (weblink). A
more detailed analysis of the topics is included in the annexes to this report. 
The following training is proposed: 
A. Procedures for the investigation and reporting of serious health and safety
breaches. 
B. Optional refresher briefings, depending on demand, selected from the following
topics: 
 Gas safety in catering premises 
 Solid fuel catering appliances 
 Inflatable play equipment 
 Legionella in water services 
 Manual handing 
Page 135

Page 136

APPENDIX 2: Occupational Health and Safety 
Law Enforcement Policy 
1. Introduction   
1.1 Argyll and Bute Council is an enforcing authority for the purposes of the
Health and Safety at Work etc. Act 1974 (“the Act”). 
1.2 As an enforcing authority under the Act, the Council’s objective is to
protect the health, safety and welfare of people at work, and to
safeguard others, mainly members of the public, who may be exposed to
risks from the way work is carried out. 
1.3 The Council is required to have regard to the Health and Safety
Executive’s (HSE’s) Enforcement Policy Statement in determining its own
policy, and HSE’s Enforcement Management Model in making
enforcement decisions in individual cases. 
1.4 The principles and policies set out in this document are brought into
operational effect by procedures approved by the Regulatory Services
and Building Standards Manager in consultation with the Area
Environmental Health Managers, and the Lead EHO (Health & Safety and
Service Support).   
2. The principles of enforcement   
2.1 Argyll and Bute Council is committed to firm but fair enforcement of
health and safety law. The Council’s approach is informed by the
following principles: 
2.1.1 Proportionality, which means that enforcement action relates
to the risks to health and safety, to the seriousness of any
breach and to any actual or potential harm arising from a
breach of the law. 
2.1.2 Targeting, which means that the regulatory activities of the
Council are directed primarily on those whose activities give
rise to the most serious risks or where the hazards are least
well controlled. Targeting also requires that action is focussed
on the dutyholders who are responsible for the risk and who
are best placed to control it. 
2.1.3 Consistency, which means taking a similar approach in similar
circumstances to achieve similar ends. This is not the same as
uniformity and requires the exercise of professional judgement
and discretion by inspectors. 
Page 136

Page 137

2.1.4 Transparency, which means helping dutyholders to understand
what is expected of them and what they should expect from
the Council as an enforcing authority. It also means making
clear to dutyholders not only what they have to do, but where
this is relevant, what they don’t. This means distinguishing
between statutory requirements and advice or guidance about
what is good practice but not compulsory. 
2.1.5 Public transparency also requires that the Council shall
publicise successful enforcement actions such as prosecutions. 
2.1.6 Accountability, which means that the Council, as an enforcing
authority, is accountable to the public for its actions. This
means having a clear and accessible complaints procedure
which is brought to the attention of those with whom
inspectors come into contact.    
3. The purpose and methods of enforcement   
3.1 The purpose of enforcement is to: 
3.1.1 Ensure that dutyholders take action to deal immediately with
serious risks; 
3.1.2 Promote and achieve sustained compliance with minimum
legal standards; 
3.1.3 Ensure that dutyholders who breach minimum legal
requirements, and directors or managers who fail in their
responsibilities, may be held to account, which may include
reporting offences to the Crown Office Procurator Fiscal
Service. 
3.2 The methods of enforcement are: 
3.2.1 Giving information and advice, either verbally or in writing; 
3.2.2 Serving improvement or prohibition notices; 
3.2.3 Reporting the matter to the Crown Office Procurator Fiscal
Service     
3.3 In addition to the methods of enforcement set out above, inspectors
have powers under section 20 of the Act to deal with causes of
immediate danger in the workplace.   
4. Enforcement decisions   
4.1 Enforcement decisions shall be taken having regard to HSE’s
Enforcement Policy Statement and Enforcement Management Model. 
Page 137

Page 138

4.2 Enforcement decisions shall be made in accordance with the principles
set out at section 2 of this policy.   
5. Prosecution   
5.1 Enforcement decisions shall be made in accordance with the principles
set out at section 2 of this policy. 
5.2 The decision to report an offence to the Crown Office Procurator Fiscal
Service shall be considered when: 
5.2.1 Prosecution is identified as the most appropriate intervention
from the Enforcement Management Model; 
5.2.2 The relevant dutyholder has failed to comply with an
improvement notice without reasonable excuse; 
5.2.3 The requirements of a prohibition notice have been breached. 
5.3 Where inspectors are obstructed in the execution of their duty,
consideration shall be made to reporting the matter to the Crown Office
Procurator Fiscal Service. 
5.4 Where inspectors are assaulted, the Council shall always support the
officer should they wish to report the matter to the Police, with a view
to seeking the prosecution of offenders.   
6. Business’s right to challenge incorrect health and safety advice   
6.1 Businesses are entitled to receive sensible health and safety advice
based on risk, and Argyll and Bute Council are committed to giving
advice on that basis. 
6.2 Argyll and Bute Council shall put the following procedures in place to
enable businesses to challenge incorrect health and safety advice, or
advice which goes beyond what is required to control the risk(s)
adequately: 
6.2.1 A business can raise the matter with the Inspector directly; 
6.2.2 If not satisfied, the business can raise the matter with the
inspector’s line manager; 
Page 138

Page 139

6.2.3 If still not satisfied, the business can: 
6.2.3.1 Raise the matter through the Council’s Complaints
Procedure, and/or; 
6.2.3.2 Raise the matter with the Independent Regulatory
Challenge Panel.     
6.3 All informal letters shall include a paragraph setting out the Council’s
commitment to giving sensible health and safety advice and indicating
how a business may raise concerns about the requirements or advice
given, including how to contact the Independent Regulatory Challenge
Panel.   
7. Enforcement in premises in which Argyll and Bute Council may have 
an interest   
7.1 A potential conflict of interest may occur where Argyll and Bute Council
is the relevant enforcing authority in relation to premises in which it also
has an ownership or management interest. A conflict of interest can
either be an actual or a perceived conflict of interest. 
7.2 Potential conflicts of interest shall be managed according to the
following principles: 
7.2.1 The Regulatory Services and Building Standards Manager shall
be proactive in identifying and addressing potential conflicts of
interest and will consult with the Council's Senior Health and
Safety Officer; 
7.2.2 The Regulatory Services and Building Standards Manager shall
propose arrangements for dealing with those exceptional
circumstances where a conflict of interest has come to light
after an incident has occurred; 
7.2.3 The Regulatory Services and Building Standards Manager shall
consult with the Council's Senior Health and Safety Officer to
identify whether any potential conflicts of interest are
introduced or removed when governance arrangements
change.     
7.3 It is not presumed that HSE will act as the default regulator where there
is a potential conflict of interest. Other means of addressing the conflict
should be explored first, with transfer of enforcement responsibility to
HSE taking place only in exceptional circumstances and as a last resort. 
7.4 Argyll and Bute Council shall otherwise: 
7.4.1 Carry out its enforcement policy and practice in the same way
that it does for all other premises and dutyholders; 
7.4.2 Inform HSE if enforcement allocation for the premises requires
to be reviewed or re-allocated.
Page 139

Page 140

8. Appointment of Inspectors   
8.1 The Executive Director, Development and Infrastructure Services has
delegated authority under the Council’s Scheme of Delegation to
appoint inspectors under the Act. 
8.2 The appointment of inspectors and the variation of the level and scope
of their appointments is at the discretion of the Executive Director,
Development & Infrastructure Services, having regard to the
recommendation of the Regulatory Services and Building Standards
Manager.   
9. Indemnification of Inspectors   
9.1 Under the terms of section 26 of the Act, where an action has been
brought against an inspector in respect of an act done in the execution
or purported execution of any of the relevant statutory provisions and
the circumstances are that he is not legally entitled to require Argyll and
Bute Council as the enforcing authority to indemnify him, Argyll and
Bute Council shall, nevertheless, indemnify him against the whole or any
part of any damages and costs or expenses which he may have been
ordered to pay or may have incurred, if the Regulatory Services Manager
is satisfied that he honestly believed that the act complained of was
within his powers and that his duty as an inspector required or entitled
him to do it.   
10. Review   
10.1 This policy will be reviewed annually, and more frequently as may be
required, by the Regulatory Services and Building Standards Manager. 
10.2 The policy will be presented to the Planning, Regulatory Services and
Licensing Committee for approval as part of the Occupational Health and
Safety Law Enforcement Plan. 
Alan Morrison, Regulatory Services and Building Standards Manager
Reviewed: July 2023
Reviewer: Patrick Mackie, EHO (Health & Safety and Service Support)
Page 140

Page 141

ARGYLL AND BUTE COUNCIL  Planning, Protective Services and
Licensing Committee 
Development and Economic Growth  20 September 2023 
ANIMAL HEALTH & WELFARE WORK PLAN 2023/25 
1.0 EXECUTIVE SUMMARY   
1.1 A sustainable agricultural sector is important to economy of Argyll & Bute
to ensure that its produce is of high quality, in demand and is able to be
marketed locally and nationally. This is dependent on a “compliant
industry” and the Council plays a key role in ensuring compliance with
legislation through its statutory duties under the Animal Health and
Welfare (Scotland) Act 2006. 
1.2 This report outlines the work and priorities of the animal health and
welfare inspectors, within Regulatory Services, and seeks approval of
the Animal Health & Welfare Enforcement Work Plan 2023/25which
focuses on preventing the spread of animal disease and protecting
standards of welfare. 
1.3 The Plan meets the Council’s statutory duties and the requirements of
the Scottish Governments Animal Health & Welfare Framework
Agreement, which specifies the core requirements for animal health &
welfare service. 
The Plan has been developed in conjunction with our lead veterinary
officer from Animal Health and Plan Agency and sets out our priorities of
both agencies for 2023/25 and areas of joint working to meet local and
national priorities. It reflects available resources, and the principles of
“better regulation” and joint working. 
1.4 Recommendations 
That members note the nature of this work and agree to formally endorse
the Argyll & Bute Animal Health & Welfare Work Plan 2023/25.   
Page 141 Agenda Item 10

Page 142

ARGYLL AND BUTE COUNCIL  Planning, Protective Services and Licensing
Committee 
Development and Economic Growth  20 September 2023 
ANIMAL HEALTH & WELFARE WORKPLAN 2023/25 
2.0 INTRODUCTION   
2.1 The Council has a statutory duty under the Animal Health (Scotland) Act 1981/2006
to regulate the provisions of the Act. These responsibilities are to enforce legislative
standards and secure compliance relating to animal health (i.e. the prevention or
controlling the spread of disease) and the welfare of animals. 
2.2 The key priorities for the animal health and welfare service are to: 
(i) Prevent the introduction and, control the spread of animal diseases including
zoonotic diseases (e.g. rabies, tuberculosis etc.) which can be transmitted to
humans.  
(ii) To ensure that the welfare needs of animals are met.  
(iii) Promote ‘compliance business and growth’ by supporting the agricultural and
associated industries  
(iv)  Proportionate and appropriate enforcement of the Act and associated
regulations 
2.3 This work is undertaken by qualified and competent animal health & welfare officers
who work on a daily basis with our partners, and are supported by other Regulatory
Services staff, as required.  These partners include business, haulers, market
operators, as well as other regulatory services including Animal Plant & Health
Agency (APHA), Scottish Government Rural Payments Inspectorate (SGRPID) and
the Scottish Society for the Prevention of Cruelty to Animals (SSPCA). 
2.4 Councils are required to have in place a formal enforcement plan to meet the core
requirements of the Animal Health & Welfare Framework Agreement which defines
the standards for core components. The 2023/25 work plan (see appendix 1) meets
the Framework requirements.  
3. RECOMMENDATIONS 
3.1 That members note the nature of this work and agree to formally endorse the Argyll
and Bute Animal Health & Welfare Work Plan 2023/25. 
4.0 REVIEW OF PERFORMANCE 
4.1 In developing the plan for 23/25, it is important to review performance against the
previous plan, achievements and emerging issues. This will include the ongoing
Avian Influenza outbreak, 
4.2  The service has worked hard to reinstate services post pandemic and to adapt new
working practices where officers are working across offices, on site, on occasions
working from home and using new technology.  This has been successful but there
Page 142

Page 143

have been long-term absence issues in animal health were the team have been
under-resourced by 0.6FTE (35% of the team for the last 18 months). This has
impacted on performance and work reprioritized to meet available resource. 
High risk farm visits and market inspections Target 100% Achieved 85%
Service requests resolved within 20 working
days
Target 85% Achieved 73% 
4.3  The reporting of statistics is only one element of measuring performance and it is
important to recognise specific work or activity. In the last year, we have achieved
the following:   
 Animal Disease- avian influenza. The UK experienced its largest avian
influenza outbreak in 2022 and the outbreak has continued into 2023
with outbreaks and positive cases still being identified. Specific actions
have been taken by Argyll and Bute Council to engage with commercial
and domestic poultry keepers to enhance their biosecurity arrangements
and other controls, to provide advice to minimise contact with wild bird
carcasses which were washed upon our coastlines, and review the
Councils arrangements to respond to an avian influenza outbreak in our
area.
 Markets; targeted interventions at livestock markets to deliver the markets
strategy conjunction with Animal Health and Plant Agency  colleagues and
ensure compliance with appropriate standards, including transportation to
and from markets
 SVS. Actively participated in the national project to develop a Scottish
Veterinary Service and the proposal that local authority animal health and
welfare activities be included in the new agency. Following considerable
work, the decision was taken nationally, to remove local authority services
from the project brief.
 Island communities. A multiagency forum was held to discuss and
identify actions to be taken in the event of a disruption to ferry travel from
the islands when there are associated island markets, and exception
weather conditions (e.g. high temperatures etc.) 
 Shared services: We also continue to be lead authority for the anthrax
incinerator where we have shared service agreement in place with 7 other
local authorities 
 Partnership working is essential and is embedded within our work with
APHA, environmental health and trading standards, Police Scotland (aided
by the Rural Crime and Serious Organised Crime Groups) and other
agencies. We have formally agreed a memorandum of understanding with
APHA & SSPCA regarding data sharing and joint working/support.
 Business support: We continue to provide advice and assistance to
industry through inspections and visits or responding to enquiries.
Proactively, guidance/ information notes are issued through our alternative
enforcement plan and an example is in Appendix 2 of this report
 Enforcement. Ensured compliance across a range of interventions
including the service of formal Notices in some cases and a successful
prosecution for an offence against a farmer for unnecessary suffering of
an animal (Animal Health (Scotland) Act)  The resultant fine of £3500
respectively
 Review of disease contingency plans. The Argyll nad Bute Animal
Disease Plan was revised, together with specific animal disease plans (i.e.
rabies, avian influenza etc.) to enhance our preparedness to respond, and
align with the West of Scotland Regional Resilience Animal Health and
Page 143

Page 144

Welfare Sub-group arrangements. 
 Training and development: Successfully completed the training and
mentoring plan for an Animal Health and Welfare Officer who started on
the 14 March 2022. 
5.0 SERVICE PLAN 2023/25 
5.1  The Work plan meets the core requirements of the Animal Health & Welfare
Framework Agreement and targets our limited resources to high risk activities and
the delivery of regional and local priorities. It also sets a number of key performance
targets. 
5.2 Section 9 of the work plan includes the regional and local priorities and the following
are highlighted: 
 Operational priorities. We will target resources at high risk premises,
markets; disease notifications and to reactive service complaints.  The
service plan clearly details our other planned work
 Scottish Market Strategy. We will continue to deliver the national markets
strategy which originated from the work within Argyll and Bute
 National Contingency Plan. We will review the arrangements for the
anthrax incinerator which is shared with other local authorities and
enhance our preparedness to respond to an animal disease incident
 Avian Influenza. We will continue to monitor the situation and adequacy
of the current controls, taking proportionate action as necessary, and
ensure our preparedness to respond to an incident. 
 Collaborative working. We will continue to foster good working
relationships and reduce, where possible the burden on business, through
joint inspections with other regulators. We will also be pursing how we can
be more effective and seeking to improve resilience through possible
sharing of resources. We have a Memorandum of Understanding in place
between APHA, the Council and SSPCA. We also actively participate in
the Serious Organised Crime and the Rural Crime Groups.
 Intelligence sharing. To continue to extend on the use of information
management and sharing systems and sharing local intelligence 
5.3 The Animal Health and Welfare Work Plan 2023/25 details the actions of Argyll and
Bute Council and work to be undertaken separately or jointly, with Animal Plant &
Health Agency (APHA). It has been agreed with APHA and they have given an
undertaking to provide resources to meet the planned actions in Section 9.2. 
5.4 Assessment against the National Framework Standards
As a service and a Council, we are well recognised by our peers; actively support
the regional and national meeting; are seen to support and work with business. I
would gauge the service, against the Framework as meeting ‘good practice’ in
many of the criteria. 
5.5 We considered whether it is appropriate to increase to reduce our standards for each
element to either minimum, good practice or better practice, This reflects the
importance of the agriculture industry to Argyll and Bute and the inherent risks. We
have made changes from our previous plan with some criteria being reduced
from better practice to good practice to reflect emerging issues, and our
available resource. 
Page 144

Page 145

5.6 Our enforcement policy seeks to work with and support business, with the initiation
of formal enforcement action being only where there is significant risk from non-
compliance; to disease control or non-cooperation with our informal approach. We
do not propose to change this approach which is consistent with the Scottish
Governments Regulatory Strategic Code. 
6.0 CONCLUSIONS 
6.1 The Animal Health & Welfare Work Plan 2023/25 meets the Council’s statutory duties;
supports the agricultural sectors and protects animal health and the wider public health. I
commend the plan to members and ask that it be formally approved.  
7.0 IMPLICATIONS   
7.1 Policy None 
7.2 Financial Existing budget to deliver plan 
7.3 Legal Meets council’s statutory duty under Animal Health (Scotland) Act
1981/2006 
7.4 HR None 
7.5 Fairer Scotland 
7.5.1 Equality No adverse impact on key characteristics 
7.5.2 Socio-
economic
None 
7.5.3 Islands None 
7.5.4 Climate
change
Meets principles 
7.6 Equalities None 
7.7 Risk (a) The increasing national drivers of retaining Scotland’s high
health and disease free status, and meeting national and local
priorities has led to an increase in demand on the service.  This
will be managed through targeting high risk activities in the first
instance. 
(b) There is a risk relating to capacity to respond to a major incident
in Scotland, but the contingency work being done should
mitigate this. 
7.8 Customer
Service
None   
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan
Policy Lead:  Councillor Green
6 September 2023                                                 
For further information contact: Alan Morrison, Regulatory Services and Building 
Standards Manager, 
Tel: 01546 604292, email: alan.morrison@argyll-bute.gov.uk 
APPENDICES: 
Appendix 1- Animal Health and Welfare Service Plan for Argyll and Bute 2023/25 
Page 145

Page 146

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
1.  Planning the Delivery of the Local Authority Animal Health Function
1.1 Profile of Local
Authority area
and associated
animal health
and welfare
workload
MIN 
Analysis of  critical control points by type, number, days of
operation, including: 
• premises used for sales (e.g. auction markets etc.) 
• abattoirs/slaughter houses 
Analysis of agricultural premises according to risk 
Summary of staff engaged in Animal Health and Welfare work 
Outcomes 3 and 5
a) This is detailed above in section 3 of the Service Profile. 
b) The service plan has been discussed and agreed with the APHA. We have incorporated APHA interventions into the plan in section 11, demonstrating the joint
working arrangements which are in place between both agencies and our aim to develop an “Animal Health and Welfare Plan for Argyll and Bute” 
c) We have a good working relationship with Scottish Governments Rural Payments Inspectorate which involves partnership working which is increasing with
greater integration of visits. 
d) We have a formal Memorandum of Understanding in place between Argyll and Bute Council; Animal and Plant Health Agency (APHA) , Scottish Society for the
Prevention  of Cruelty to Animals (SSPCA) relating to working arrangements and data sharing 
e) Increased liaison with Police Scotland, Scottish Environment Protection Agency, other regulators including Food Standards Scotland and the industry through the
Rural Crime Group; Serious Organised Crime Group and specific working. 
f) Active member of the Argyll and Bute Agricultural Forum. 
1.2 Annual Service
Plan for delivery of
services in Animal
Health and Welfare 
BP
Service Plan produced detailing levels of Service Delivery for
all activities detailed in this activity framework, reflecting
national and local priorities. Annex C should be used as a
template. 
Outcomes 3, 4,and 5 
The service plan is formally agreed by the Councils Regulatory Services Manager and Lead Veterinary Officer with the APHA annually and formally approved by the
Planning, Protective Services and Licensing Committee.
It is reviewed quarterly, amended as necessary to reflect emerging priorities and available resource, and key measures are reported on corporately 
APPENDIX I : 
ANIMAL HEATH AND WELFARE SERVICE PLAN 2023/25 FOR ARGYLL AND BUTE 
Local Authority: ARGYLL AND BUTE COUNCIL
Service Plan for year: 01/04/2023 - 01/04/2025
Page 146

Page 147

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
1.3  Risk Assessment 
GP
Premises risk assessed in accordance  with the national risk
scheme detailed in Section 4 
Risk based inspection programme 
Outcomes 1, 2, 5 and 6
a) All premises are rated using our revisions to the COSLA risk rating scheme and classed as high, medium or low risk. They are them programmed for inspection
based on our inspection frequency 
b) Risk assessments are reviewed and updated following each programmed visit. This then identifies the next due date and type of intervention.
c) The programme for High Risk premises is notified to the APHA and SGRPID in an attempt to share information and where possible, undertake joint visits. It also
allows other agencies to highlight specific issues which can be considered as part of the programmed visit. This is consistent with the principle of better
regulation, but where the other agencies are unable to share their programmes, we will undertake our own work, as planned. 
d) The planned interventions programme for 2017-18 has been agreed and our local targets are 
 95%  of high risk visits 
 Other- intelligence-led.
2 Training and Development
2.1  Training for new
officers 
On-going professional
development 
GP
Officers are authorised to enforce all relevant legislation.
All enforcement staff to hold recognised qualification or
have equivalent professional experience i.e. ‘Grandfather
rights’ or undertake to achieve such qualifications as soon
as possible
It is recognised that in emergency situations i.e. outbreaks
of disease, there may be a need to call upon non animal
health qualified officers to assist in carrying out animal
health and welfare duties. 
Time and resources allocated to keep up to date on
appropriate Animal Health and Welfare legislation, codes of
practice, guidance etc. – e.g. by accessing Local
Government Regulation website 
Outcome 5 
a) All animal health and welfare officers are authorised in accordance with the legislation. Their level of authorisation is dependent upon their qualifications, training
and competency
b) Two of our officers have a formal AHW qualification and all have a working knowledge of the agricultural sector. The other is working towards an accredited
qualification. 
c) In the event of emergencies, we will authorise other Regulatory Services staff to undertake specific duties, subject to their skills (i.e. EHO’s may be involved in
contact tracing, cleansing and disinfection etc.)
d) We have a Continued Professional Development system in place for AHW officers to ensure they maintain and their competency and are informed of
developments etc. There is also an annual Performance Development Review process which is competency based and identifies a range of objectives targeted
at the service plan, the competency framework and the individual’s professional and professional development. This is reviewed in the course of the year 
The target is 10 hours CPD for each officer in the year
3.  Licensing Activities 
3.1  Zoo licensing
We will undertake the necessary work associated with licensed zoos within our area and respond to any associated service requests. As of 1st March 2017, there are 2
licensed zoos in Argyll and Bute
We are trying to identify specific training in relation to the enforcement and regulation of zoos. 
Page 147

Page 148

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
4.  Education and advice to maximise compliance
4.1  Education and
advice 
GP 
Guidance provided to businesses on all aspects of Animal
Health and Welfare for which Local Authorities are responsible,
including any movement licensing requirements. 
Delivery targets should be set in accordance with individual
Local Authority ‘charter’ response times. 
Outcomes 1, 2, 5 and 6
a) All calls to the service are received by the Councils Customer Contact Centre and they respond based on agreed scripts provided by Regulatory Services. 
b) General advice is available through our website and this is maintained and kept updated.
c) Business advice available from officers during working hours and information readily available on the website. There is also a generic email box for animal
health enquires.  AH&W business advice available on Council website.
d) We have local indicators relating to service requests resolved within 20 working days and the number of high risk inspections done within the due date. We are
also in the process of establishing a benchmarking club to develop common benchmarks between similar local authorities to aid service improvement
Target
1. Resolve 85% of service requests within 20 working days
4.2 Proactive activity 
BP
Proactive involvement or lead in education and training events
with stakeholder organisations etc. 
Joined up approach to education and advice through liaison
with the Scottish Government, , Local Government Regulation
and APHA 
Outcomes 1, 2, 5 and 6 
a) We provide information to the industry through “surgeries” at markets and other visits; on a one-to-one basis during inspections; by working with specific groups
(e.g. Agricultural Forum etc.) and by direct liaison with other partners including NFU, Food for Argyll etc.
b) Information displayed on website, attendance at stakeholders/enforcement groups and alternative enforcement strategy in place
c) Focussed Information is issued to specific target groups through our alternative enforcement strategy. This is aimed at keeping businesses advised of
developments/changes and to allow them to take steps to ensure their businesses meet standards.
d) We are an active member of the National Animal Health and Welfare Strategy Group, the National Framework Steering Group, and various liaison/panel
meetings across Scotland and the Framework Steering Group. In additional and at a local level we have liaison group arrangements with the NFUS, SGRIPID,
SSPCA and the local Argyll and Bute Agricultural Forum 
Target 
Complete AHW activities within Alternative Enforcement Plan 
Page 148

Page 149

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
5.  Enforcement activities to maximise Animal Health and Welfare compliance
5.1 Attendance at
Critical Control Areas- 
Livestock markets,
Sales, and Assembly
Centres 
BP 
Highly visible preventative enforcement presence.
Attendance at markets and other sales, and Assembly Centres
to ensure compliance, in particular with:
 Biosecurity (vehicles, premises and people)
 Livestock identification
 Welfare
 Transport
 Licensing and record keeping
 Specific pre movement licensing
 All other relevant legislation 
Exact attendance levels and times
according to status of gathering 
Outcomes 1, 2, 5 and 6
a) We will continue to deliver the National market strategy to ensure that we are able to undertake our enforcement duties within markets and effectively utilise the
available resources we have. 
b) The interventions required for each market is specific to each, given the outcome of its risk assessment, and programmed into the services operational work.
c) Additional interventions, and other associated visits to farms and other premises, will be undertaken as a result of the findings of routine market visits and also
intelligence gathered from other sources, including service requests and notifications from other services (e.g. environmental health)other local authorities or
agencies. 
Target:
1. The projected number of programmed market visits is 44 (reduction in 4) although this will be confirmed after the joint inspections of the markets
which is to be undertaken in conjunction with AHPA. Fewer but bigger markets
2. We will measure our performance against this programme with target of 100% of the agreed interventions programme for markets being completed 
5.2  Attendance at
Critical Control Areas - 
slaughter houses
The MHS are responsible
for enforcement and Local
Authorities should liaise
with MHS with regard to
any need to enter the
slaughterhouse production
area.
BP
Attendance at slaughter houses (high and low
through put, red meat and poultry(white meat) in
liaison with FSA OV to ensure legislative
compliance, 
Those activities with regard to the transport unloading
and identification of livestock should normally occur
outside of the slaughterhouse production area. 
Outcomes 1, 2, 5 and 6 
a) No inspections required for the island slaughterhouses following discussions with Food Standards Scotland Attendance at slaughter house on request
of OV or the Meat Hygiene Service or as a result of particular intelligence that there is a problem outwith the responsibility of the OV.
b) Ongoing liaison with APHA or FSS regarding any planned interventions
c) Improved liaison between LA’s and FSS which identifies issues from slaughterhouses outwith our area, relating to businesses within Argyll and Bute. This allows
us to take appropriate enforcement action. This is 2-way communication between agencies. 
Target: to respond to enquiries regarding slaughterhouse and participate in intelligence-led interventions where there is reason to act due to legitimate
concerns. – 100%
5.3  Attendance at
Critical Control Areas  -
Dealers/Agents 
GP 
Identification of Dealers and Agents 
Visits/inspections to verify legislative compliance 
Outcomes 1, 2, 5 and 6
a) List of High Risk dealers and agents compiled in consultation with APHA
b) Businesses will be inspected in accordance with their risk rating or more frequently based on local, regional and national intelligence or concerns
 High risk  dealer premises to be visited in terms of their risk rating
 Written report of non-compliance given at time of visit
 Major non compliances reported to relevant agencies
 Re-visits undertaken when actionable infringements occur
 All investigations, visits and actions entered into UNIFORM software system
Target: 100% of high risk visits completed
Page 149

Page 150

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
5.4   Attendance at
Critical Control Areas  
- Ports 
MIN 
Attendance at Ports to ensure legislative compliance, in
particular with:
 Biosecurity (vehicles, premises and people)
 Livestock identification
 Welfare
 Transport
 Import/export documentation
 All other relevant legislation 
Outcomes 1, 2, 5 and 6
There are no significant ports within Argyll and Bute Council although there is the movement of livestock throughout the district by ferries and road. 
To combat this we have:-
 Arrangements in place with CALMAC which regulates the transportation from livestock from the islands
 Respond to any notifications or issues relating to imported animals 
We will continue to support  APHA, in respect of the storage and disposal arrangement for animal by-products and international catering waste at marinas
and ports and other high risk premises in a programme of joint working with APHA 
5.5  Attendance at
Critical Control Areas  
- High risk Farms
(Other than dealers or
agents) 
Visits/inspections to verify legislative compliance 
Outcomes 1, 2, 5 and 6 
a) All premises are inspected in accordance with the risk rating although more frequent inspections may be undertaken where local knowledge or intelligence
suggests possible AHW issues. The inspection programme is developed and agreed with the Service Manager at the beginning of every financial year and
resources are allocated to meet this programme. The programme is discussed with SGRPID to minimise the duplication caused by multiple inspections and
visits.
b) High risk premises to be visited annually.  Written report of non-compliance given at time of visit. Major non compliances reported to relevant agencies Re-visits
undertaken where appropriate 
Target: Inspect 35  high risk premises 
5.6 Visits and
inspections to other
premises 
Visits to verify legislative compliance.
Commercial hauliers
Farms (including own livestock vehicle)
Agricultural Shows and farm dispersal sales
Animal by-products premises including 
Any other premises of livestock origin and destination 
Outcomes 1, 2, 5 and 6
a) Visits only undertaken to other premises on intelligence basis or as a result of another inspection plan e.g. Primary Production visit plan.
b) Integrated primary production inspections are undertaken by AHW officers and the remit includes animal health and welfare, food , where the business is subject
to a high risk visit for animal health and welfare
c) Joint working arrangements are in place with APHA SGRPID and the SSPCA.
d) All inspections are confirmed in writing 
All enforcement action is taken in accordance with the services enforcement policy and procedures. These are revised annually or more frequently, as
required. Formal notices are reviewed by the officers line manager prior to service by the officer., All formal reports to the PF are approved by the
Regulatory Services Manager
Page 150

Page 151

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
5.7 In transit checks 
GP 
Roadside checks (in conjunction with police) 
Police led multi agency roadside checks
local authority led checks  for animal health and welfare
compliance only (including co-ordination with adjacent Local
Authorities) 
National exercises and operations 
Outcomes 1, 2, 3, 4 and 6
a) We have joint working arrangement with the police for roadside checks where evidence and intelligence identifies the need
b) We are actively participating in the Rural Crime Group and Serious and Organised Crime Group so we are able to share intelligence and target partnership
working to specific issues or perceived concerns. 
c) Only on basis of intelligence. 
Target; To actively participate in the Rural Crime Group and Serious and Organised Crime Groups, to promote intelligence driven partnership working and
targeted actions, including joint roadside checks, where appropriate, with police and other agencies 
5.8 Vehicle biosecurity
– cleansing and
disinfecting compliance 
MIN
Checks on vehicles to ensure cleansing and disinfection carried
out at premises other than where they have delivered livestock   
Outcomes 1, 5 and 6 
a) On-going  routine checks at livestock market
b) Specific checks will be made on vehicles where targeted intelligence identified issues and concerns or where disease is suspected
c) Alternative enforcement and follow-up visits will be made to respond to any issues identified through market audits 
Target; interventions undertaken subject to our market intervention plan, concerns or intelligence-led
5.9 Out of operating
hours checks 
GP 
Checks out of normal specified operating hours or subsequent
days for:
Markets
Slaughter houses 
Premises used for collection of animals for slaughter or for
further rearing or finishing 
Outcomes 1, 2, 5 and 6 
These will be inspected in accordance with their risk categorisation and in response to service requests or concerns. The market strategy requires work out with core
hours (e.g. weekends etc.) 
Target; where necessary visits will be undertaken outwith core-hours.
5.10  Stand by and on
call arrangements 
GP
Emergency interagency contact regarding disease and other
enforcement incidents 
Outcomes 1, 2, 3, 4 and 6
a) Emergency out of hours contact procedure in place and notified to agencies
b) Out-of-hours arrangements through Civil Contingencies Manager or Regulatory Services Manager/Senior Animal Health and Welfare Officer. These are reviewed
annually and updated as required
c) Contingency plans have full details of out-of-hours arrangements 
Page 151

Page 152

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
6.  Partnership working and intelligence driven enforcement
6.1 Identified
Infringements 
MIN
Identified breaches of legislation, including biosecurity,
licensing, welfare, livestock identification, standstill breaches,
illegal imports, by products, and other disease control work.   
Irregularities found on documentary checks followed up 
Outcomes 1, 2, 5 and 6
a) We will respond to service requests received from the general public, industry and other agencies. These will be investigated and appropriate action taken in
accordance with our Enforcement Policy
b) Follow up checks  will be undertaken on suspected irregularities identified on SAMU, BCMS, by SGRIPID,SSPCA and APHA
6.2  Intelligence /
Information and
systems 
BP/GP
Provision and collection of Intelligence Information 
Outcomes 1, 2, 5 and 6
a) We use the UNIFORM information management system to record all inspections, service requests and enforcement activity associated with this work. The
system provides management information, and generates inspection programmes etc. It is effective in terms of work planning and reporting and is shared with
other Regulatory Services staff.
b) Liaison and other group, together with peer relationships, provide an opportunity to share intelligence in accordance with Data Protection requirements, and to
develop collaborative and joint working. 
c) We use the national MEMEX intelligence systems to record animal health and welfare issues which may have a local or national interest but will consider use of
the alternative IDBsystem.  This information is collated and studied nationally and promotes an intelligence-led approach between local authorities, Police
Scotland and other agencies.
d) We have established local intelligence sharing protocols with Police Scotland and West Dunbartonshire Council, through the Serious and Organised Crime
Group
Target: Continue use of and strengthen use of IDB  and  the local intelligence sharing systems
6.3 Intelligence led
actions 
GP
Infringements or suspected infringements reported from
external enforcement sources or identified by use of data
interrogation or intelligence sources;  members of the
public/complaints 
Outcomes 1, 2, 5 and 6
a) Enforcement policy in place and reviewed annually. This reflects the statutory work of the services and the actions to be taken in the investigation of animal
health and welfare activity. The policy is consistent with the Governments |Regulatory Strategic Framework
b) We have monthly operational teleconferencing meeting with APHA, which are used to review priorities, work plans and identify/discuss any issues, trends or
issues for investigation 
c) A formal RIPSA authorisation process is followed where directed surveillance may be required 
Page 152

Page 153

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
6.4 Cross border and
multi-agency working 
GP
Assessment and communication to interested parties of cross
cutting issues 
Research/intelligence led activities including workshops 
Joint investigations/exercises/initiatives 
Mentoring arrangements 
Outcomes 1, 2, 3, 4 and 5 
a) We are integrated with EH and AHE within Regulatory Services which has considerable benefits in terms of resourcing and specific work, including links to public
health and zoonosis (e.g. TB; contingency planning and ABP
b) Proactive work with other local authorities
c) We manage and maintain the animal health incinerator for anthrax cases which is a shared resource between 8 local authorities 
d) Member of the National Framework Steering Group
e) Membership of AH&W Regional and Chair of National Panels.  
f) Taking part in their cross cutting projects.
g) Member of Animal Health and & Welfare Strategy Group
h) We have local arrangements in place with  SGRPID to reduce multiple visits and promote joint working
i) We have a formal Memorandum of Understanding in place between Argyll and Bute Council; Animal and Plant Health Agency (APHA) , Scottish Society for the
Prevention  of Cruelty to Animals (SSPCA) relating to working arrangements and data sharing
j) We have mutual support arrangements agreed with other neighbouring local authorities
k) We have a working relationship with Quality Meat Scotland 
7.  Post enforcement reporting and Animal Health and Welfare Management and Enforcement System (AMES) data entry activities
7.1   REMOVED 
7.2 Management
information 
GP
Collation of management information data for internal use and
provision to the Scottish Government and Animal Health, 
Outcomes 3, 4 and 5 
Timely provision of information in particular submission of statutory returns
Local performance measures in place and reported quarterly
Information management system in place which generates Scottish Government Enforcement return
We have a wide range of performance indicators relating to inspections and the resolution of service requests. These are reported quarterly across the Council via
Pyramid, and we are working with other LA’s to develop a benchmarking club so we can compare information with other similar authorities
We have implemented an electronic document management system with links to our UNIFORM management systems. 
8.  Contingency planning and emergency action
8.1  
Animal Health, Scottish
Government , COSLA
and local authority
emergency
preparedness 
GP 
Planning and contributing to emergency
preparedness plans with APHA /Scottish
Government and other agencies as appropriate 
Outcomes 1, 3, 5 and 6
We have a generic Animal Health Disease Plan which is approved by Council and  the intention is to review and improve against the pending Scottish National Disease
Plan
We are working with the Regional Resilience Partnerships to develop a national AHW Contingency Plan for Scotland
. 
Target 
 Review and improve against the pending Scottish National Disease Plan 
 Deliver training to “up-skill” non- animal health and welfare officers to support in a response to an animal disease incident where the plan may
be involved.
 Participate in West of Scotland Resilience Partnership to ensure that animal health and welfare arrangement are comparable with local, regional
and national plans.
 We intend to make the new plans publically available through our website
Page 153

Page 154

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
8.2  Testing and
Training 
BP
Testing, training, practising and evaluating activities in relation
to the emergency plan 
Outcomes 1, 3, 5 and 6
Target 
We will participate in regional and national exercises, as appropriate. 
At a local level, we will develop a programme of exercise to ensure local resilience and deliver this. 
8.3  Emergency Action 
MIN
Provision of full emergency range of services under the
emergency plan, when disease emergency declared by the 
Scottish Government 
Outcomes 1, 3, 5 and 6
This would be a priority incident and the service would respond in accordance with the designated plans. 
Target:
We will investigate any suspected or confirmed case of animal disease and this is classed as priority 1 in terms of the AHW service priorities 
9.  Additional Activities 
9.1 National priorities Provide details in Service Plan (Annex C) of identified priorities
as agreed with APHA and the Scottish Government 
Outcomes 1, 2, 5 and 6
The general outcome are to effectively reduce the risk of animal disease incursion and spread, thereby protecting public and animal health; improve animal welfare and
to meet the objective of Delivering and enforcing standards, of the Animal Health and Welfare Strategy; and the Scottish Government’s objective ‘well treated and healthy
farm (and domestic) animals
9.2 Regional priorities Agree  regional priorities, with APHA at regional animal health
and welfare  panel meetings for consideration  in annual
service planning 
Outcomes 1, 2, 5 and 6
Regional priorities
1. APHA will visits markets in Argyll and Bute to support the Scottish Market Strategy
2. Work with APHA in respect of animal health and welfare at fish farms and associated animal by-product issues..
3. APHA to undertake specific work in respect of the storage and disposal of animal by-products and international catering waste, working closely with Argyll and
Bute Council
4. APHA to ensure that there are adequate arrangements in place to respond to any suspected or reported case of notifiable disease; incident or request for
assistance from the local authority, either directly or through the use of local veterinary practices.
5. APHA to support LA officers in addressing on-farm/market and transport welfare issues within the response time for both organisations (48hr except where
geographical /meteorological or transport issues prohibit this response time) 
6. To ensure that there are effective arrangements in place between the local authorities, including the new FSS/ APHA enforcement team. 
Local priorities
7. Agree and deliver a joint programme of welfare checks by ABC and APHA to select high risk farms where there are concerns regarding welfare and possibly that
intervention may be required. 
8. Ensure that we continue to have effective working relationships with APHA at an operational level, particularly at a time of changes in personnel.
9. Continue to develop working relationships with SEPA, RPID and SSPCA
10. Review and implement workforce planning arrangements for animal health and welfare
Page 154

Page 155

j/typing/2017/7527 
Content and relevant outcome(s) Local Authority Planned Level of Service Delivery
9.2 Regional priorities
(cont) 
Agree  regional priorities, with APHA at regional animal health
and welfare  panel meetings for consideration  in annual
service planning 
Outcomes 1, 2, 5 and 6
Formal meeting arrangements between ABC and APHA
1. Annual service meeting with APHA to discuss and agree service plan.
2. Framework Review meeting every 6 months  
3. Monthly operational teleconference meetings are held between ABC and APHA to discuss operational issues
4. Other ad-hoc meetings as appropriate
9.3Local priorities As determined by local authority in agreement with APHA 
Outcomes 1, 2, 5 and 6
The local prioritises 
(i) Achieve 95% of high risk planned interventions
(ii) Audit markets as per the National Market strategy, work with market operators and  achieve 100% of the programme 
(iii) Deliver the alternative enforcement strategy
(iv) Review at a local level the new national contingency arrangements for animal health and welfare in Scotland and our local resilience
(v) Improve operational liaison with APHA following their ongoing service changes
On Farm Welfare 
1(a) Authorisation
Authorisation of inspectors under part 2 of the Animal Health
and Welfare (Scotland) Act 2006
3 officers, with potential to authorise other officers within Regulatory Services, as necessary, and with agreement of the Regulatory Services Manager 
1b) Response Response to farm welfare complaints received from a member
of the public or another agency
The service standard is that service requests will be resolved within 20 working days and we have a target of 85% in 2015-16
Service requests are prioritised in accordance with our rating scheme and high priority (Priority 1) requests are visited within 2 working days. 
The response to all service requests is proportionate to the nature of the complaint and may involve appoint inspections or a joint investigation with environmental
health staff, police, APHA and/or SSPCA
1(c) Enforcement
Action
Where an animal’s welfare is being seriously compromised
immediate enforcement action should be taken.
Where an animal’s welfare is being seriously compromised immediate enforcement action will be taken working with partner agencies
All enforcement action will be proportionate, risk based and in accordance with our enforcement policy
1(d) Follow up where
complaint received
Follow up visits to premises against whom a welfare complaint
is received
If necessary and in conjunction with VO the premises will be re-visited within an appropriate period of the initial visit
1(e) Follow up where
improvement notice is
served 
Monitoring visits carried out during the compliance period appropriate to the severity of the complaint 
Revisit carried out within 20 working days of the end of the Compliance Period specified in the Notice or sooner dependent upon the severity of the complaint 
Page 155

Page 156

j/typing/2017/7527 
Animal and Plant Health Agency Activity Matrix (Scotland)
Content and relevant outcomes Priority Activity
1.   Planning the delivery of the local authority animal health and welfare function
1.1  Provide a named local contact in addition to the Veterinary Lead
(VL) for routine communication on local authority matters
Outcomes: 3 and 5
Key contact identified and local authority notified of contact details and arrangements (including any changes to nominated personnel).
1.3  Local Authority Service Delivery Plan and Profile
Outcomes: 3,4 and 5
Liaise with local authorities regarding service delivery and where necessary comment and provide veterinary input on service delivery plans. 
Deliver and support local authorities in the delivery of the service plans agreed.
1.4 Risk Assessment
Outcomes: 1,2,5 and 6
Provide the veterinary assessment, where necessary, to support premise risk assessment in accordance with the local authority national risk scheme
detailed in Section 4. 
2.  Training and development
Content and relevant outcomes Priority Activity
2.1 Train VLs and nominated local representatives
Outcomes: 5
Provide appropriate Framework/AMES training to enable VLs and nominated representatives to provide support for local authorities on Framework
issues.
2.2  Provide veterinary and/or technical staff support to the local
authority
Outcomes: 3 and 5 
Provide programme of enforcement training for veterinary and technical field staff including procedures to support local authority staff when called
upon to act as professional witnesses in prosecutions.
3.  Licensing  Activities
Content and relevant outcomes Priority Activity
3.1  Licensing of animal movements
Outcomes: 1and 4
To act on referrals to revoke the general licence. 
4.  Education and advice to maximise compliance
Content and relevant outcomes Priority Activity
Page 156

Page 157

j/typing/2017/7527 
4.1  Support National and Regional Animal Health and Welfare Panels
and the Strategy Group providing information and guidance to assist
local authorities in addressing areas of concern in the region
Outcomes: 1,2,5 and 6
Provide access to information in accordance with the requirements of the relevant legislation. 
Use of APHA’s website to publicise services and provide information.
VL to work with local authorities to secure a “standard” invitation to attend with agenda item at the regional panels.
APHA will prioritise attendance to the Regional Panels when invited, and if asked to do so will provide speakers for suitable themes. 
4.2  Hold liaison meetings with suitable representatives of local
authorities and where appropriate, other interested parties;  
Outcomes: 3,4,5 and 6
Such liaison meetings to facilitate discussion on local, regional and national issues and take any necessary action on a local/regional level.
5.  Enforcement Activities to maximise animal health and welfare compliance
Content and relevant outcomes Priority Activity
5.1 Provide veterinary and/or technical staff support to the local
authority, or arrange suitable alternative support (for example, staff
from another APHA field operations office or the services of an OV); 
Outcomes: 1,2,3,5 and 6
Respond immediately to reports of suspected notifiable disease which pose an immediate threat to human or animal health. 
Reports of adverse welfare of livestock will be assessed on receipt. All reports will be investigated, with field visits undertaken within 24 hours where
there are suspicions of animals being caused unnecessary suffering.  Investigations will be carried out according to the principles of the MOU with
Scottish SPCA and local authorities. 
Approval/licensing procedures - liaise with local authority regarding applications and proposed visits e.g. ABP applications. 
Animal Health is responsible for the evaluation of BIP facilities, documentation and procedures in Great Britain.
6.  Reactive and intelligence driven enforcement
Content and relevant outcomes Priority Activity
6.1  Provide up to date information on registered livestock keepers in
the local authority area 
Outcomes: 1,2,3,4,5 and 6 
Provide and receive information in accordance with the animal health & welfare data sharing statement between Local Government Regulation, Defra
and its named executive agencies and the Scottish Government issued in August 2010. 
See Local Government Regulation and Defra websites.
6.2 Provide an overview of the national performance picture
Outcomes: 1,2,3,4,5 and 6 
Provide information/updates on current national issues affecting animal health and welfare.
7.  Post enforcement reporting and AMES data entry activities
Content and relevant outcomes Priority Activity
Page 157

Page 158

j/typing/2017/7527 
7.1  In those offices where Local Authorities are using AMES: Use
AMES regularly to be informed of local authority work, and to help In
any discussions regarding service delivery plan and profile
Outcomes: 1,2,3,4,5 and 6 
VLs or nominated representatives to extract activity reports on agreed basis for each local authority to help review enforcement activities within their
region.  Extract relevant AMES reports to support any discussions regarding local authority’s service delivery plans. 
The APHA WIT (Welfare in Transit) team accesses AMES for information to assist with its action monitoring function relating to transporter
authorisations and vehicle/container approval.
7.2 Provide feedback on performance
Outcomes: 1,2,3,4,5 and 6 
Performance issues arising from the AMES reports brought to the attention of the local authority for discussion 
8. Contingency planning and emergency action
Content and relevant outcomes Priority Activity
8.1  Responding to emergencies
Outcomes: 1,3,5 and 6 
Provide a 24 hour reporting service for animal health and welfare emergencies by operating a duty Veterinary Officer system. 
Nightline numbers are published on the website at: s://www.gov.uk/government/organisations/animal-and-plant-health- 
https://www.gov.uk/government/organisations/animal-and-plant-health-agency 
Ensure a fully joined up response to outbreaks of disease and aim to build closer links with delivery partners to ensure they are appropriately engaged
during incidents.Ea.ov.uk -u 
.defra.gov.uk/animal health/about-us/contact-us/ contact-us/index.htm
8.2 Participation in training exercises for emergency preparedness (or
an alternative option, where the number of  local authority participants
is unwieldy);
Outcomes: 1,3,5 and 6
Work closely with policy customers and operational partners; design and deliver a challenging programme of exotic animal disease exercises locally,
regionally and nationally. 
To organise a regional or national exercise on an annual basis with multiagency partners.  
9.   Additional Activities 
Content and relevant outcomes Priority Activity
9.1  National Priorities
Outcomes: 1,2,3,5 and 6 
Communicate policy and priority updates to local authority directly of via Strategy Group or Regional Panels.
9.2  Regional Priorities
Outcomes: 1,2,3,5 and 6
. Agree regional priorities, including regional initiatives,  with local authorities 
9.3  Local Priorities
Outcomes: 1,2,3,5 and 6
Agree local priorities with local authorities based on knowledge and intelligence. 
Page 158

Page 159

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES AND
LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH  20 SEPTEMBER 2023 
REVIEW OF ARGYLL AND BUTE COUNCILS SHORT-TERM LET LICENSING
POLICY 
1.0 EXECUTIVE SUMMARY
1.1 This report recommends changes to the Council’s Short Term Let Licensing
Policy to take account of issues which have arisen following a review of the
scheme in the first 11 months and a letter from a solicitor, acting on behalf of
the Association of Scottish Self Caterers (ASSC), advising of a possible
judicial review against aspects of the Policy. 
1.2 The licensing scheme was brought in by the Scottish Government under the
Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022,
with the aim to ensure short-term lets are safe, address issues faced by
neighbours, to facilitate local authorities knowing and understanding what
is happening in their area, and handling complaints effectively. It also aims
to balance the economic and tourism benefits from short-term lets with the
needs and concerns of local communities to ensure the people providing
short-term lets are suitable. 
1.3 The Council’s Short Term Let licensing scheme and Policy was approved by
Council on the 29 September 2022 and has been in place since the 1 October
2022. Significant work was undertaken to establish a new team to take on this
new statutory licensing scheme and this work has been challenging. As of the
28 August 2023, the Council had received 780 applications for short-term lets
with 149 being from new hosts entering the sector, issued 158 licences with
no refusals. The team are working through a backlog of applications. In
response to representations by the sector, the Scottish Government extended
the deadline for applications from existing hosts by six months to the 1 October
2023, and therefore the number of applications received is only 20% of predicted
levels. This is a similar picture across Scotland and we await an influx of
applications over September. 
1.4 Amendments are necessary to the Council’s Short-term Let Licensing Policy
to address issues identified through operational work and a review by the
Council’s Legal Services in response to issues raised; the revised Scottish
Page 159 Agenda Item 11

Page 160

Government Guidance to licensing authorities, and also to address the letter
from a solicitor representing the ASSC, advising of a potential judicial review
of the Council’s Policy. 
1.5 The licensing scheme is self-financing from fee income. Current application
levels are only 20% of predicted levels due to the Scottish Government’s six
month extension, and a large number of applications from existing hosts are
anticipated by the 1 October 2023. 
Page 160

Page 161

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES AND
LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH  20 SEPTEMBER 2023 
REVIEW OF ARGYLL AND BUTE COUNCILS SHORT-TERM LET LICENSING
POLICY
2.0 SUMMARY
2.1 The licensing scheme was brought in by the Scottish Government under the
Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022,
with the aim to ensure short-term lets are safe, address issues faced by
neighbours, to facilitate local authorities knowing and understanding what
is happening in their area, and handling complaints effectively. It also aims
to balance the economic and tourism benefits from short-term lets with the
needs and concerns of local communities to ensure the people providing
short-term lets are suitable. 
2.2 This report recommends changes to the Council’s Short Term Let Licensing
Policy to take account of issues which have arisen following a review of the
scheme in the first 11 months and a letter from a solicitor, acting on behalf of
the Association of Scottish Self Caterers (ASSC), advising of a possible
judicial review against aspects of the Policy. 
2.3 Amendments are necessary to the Council’s Short-term Let Licensing Policy
to address issues identified through operational work and a review by the
Council’s Legal Services in response to issues raised; the revised Scottish
Government Guidance to licensing authorities, and also to address the letter
from a solicitor representing the ASSC, advising of a potential judicial review
of the Council’s Policy. 
3 RECOMMENDATIONS
3.1 Members of the Planning, Protective Services and Licensing Committee are
invited to:- 
1. Consider this report and the revised Short-Term Let Licensing Policy
detailed in Appendix 1; and 
2. Recommend to the Council approval of the revised Short-Term Let
Licensing Policy.   
Page 161

Page 162

4 DETAIL
4.1 The Council agreed its Short Term Let Licensing Policy on the 29 September
2022 as part of a range of measures to implement the Scottish Government’s
new licensing regime by the 1 October 2022 deadline. This Policy was informed
by legislation, Scottish Government guidance and feedback from public
consultation. The intention was that this Policy would be reviewed over the first
year of the licensing scheme.
4.2 A review of the Council’s STL Policy is necessary to address issues identified
from operation of the Policy, to reflect changes to Scottish Government guidance
to local authorities, lessons from the judicial review against Edinburgh Council’s
STL Policy and a review by the Council’s Legal Services in response to issues
raised. The judicial review against Edinburgh City Council related to their STL
Policy for secondary let within tenement properties and their STL planning
control designation, amongst other issues. In reviewing the judgement, there is
minimal impact on Argyll and Bute Council’s STL Policy.
4.3 The review process has been further informed by a letter dated 11 August 2023
from a solicitor acting on behalf of the Association of Scottish Self Caterers,
highlighting a number of issues with the Policy and referring to a possible judicial
review. Specific comments were made to our Policy for variations (section 13),
temporary exemptions (section 10), temporary licences in section 12.1.2, the
need for revised wording for timescales and revisions to our pre-application
checklist to confirm that formal architectural drawing are unnecessary, The
Council reviewed matters along with its external legal advisers with the intention
of minimising the potential risk of a judicial review. These issues have been
addressed in this Policy review. 
4.4  The revised Short Term Let Policy (see Appendix 1) is provided for members’
consideration and approval. The key changes are as follows:
a) Amendments to the text to reflect the Scottish Government extension to
the 1 October 2023 for existing hosts to make application and to future
proof the Policy in areas relating to fees and charges. Reference and
links to the Council’s fee and charges is provided, together with indicative
fees for 23-24, to negate the need for the Policy to be amended and
approved by Council annually.
b) To amend the Hearings process, in light of learning form the first STL
hearings by PPSL Committee on the 21 June 2023, and to provide
consistency with the Councils civil government licensing hearing
procedures. This was approved by PPSL Committee on the 23 August
2023 and this decision is reflected in changes to section 6 of the revised
Policy. 
c) To remove the additional conditions relating to the provision of bicycles,
boats and watercraft, and play equipment which were generally
welcomed through the public consultation in 2022. Further consideration
and legal advice has identified that these are covered by other legislation
and do not specifically relate to the property. The sector also advise that
these are covered by public liability insurance. Accordingly, Appendix 4
of the revised Policy is amended to remove these additional conditions. 
Page 162

Page 163

If approved, these conditions will be removed from licences already
issued and not enforced.
d) To amend the Policy to remove temporary exemptions and replace
section 10 to state that the Council will not consider temporary
exemption. The outcome from the public consultation in 2022 identified
that 78% of respondents supported the position that we did not provide
temporary exemptions, but 22% indicated that this was important to
support rural and island communities. Accordingly, the Policy approved
by Council on the 29 September 2022, allowed for temporary
exemptions to the requirement for a licence for a single continuous
period not exceeding 6 weeks in any 12-month period to cover major
events where accommodation is provided in homes and other
properties for short periods. This aspect of our Policy is challenged by
the ASSC and on review it is considered that there is a need to amend
the definition to align to the new Scottish Government Guidance (August
23) and to identify criteria for assessment. To date we have not received
any applications and we are entering the period of the year when
applications are unlikely due to reduced festivals and events. The impact
of removing temporary exemptions is minimal and further work is
required to consider this matter in more detail and benchmark with other
local authorities. There is a mixed picture across Scotland with many of
the other rural authorities, including Scottish Borders and Dumfries and
Galloway, not providing temporary exemptions.  Therefore, to provide
time to consider this matter in more detail, and to minimise the risk of
judicial review, Section 10 of the Policy is replaced with “The Council
will not grant temporary exemptions. This position will be kept
under review”. 
e) Amendments to fees and charges in section 17.5 to remove reference
to temporary exemption and the 50% of the fee. 
f) Addressing the issues raised in the letter from the ASSC solicitor, the
wording on the pre-application checklist has been amended to provide
clearer guidance to applicants and in particular, confirming that drawings
provided need not be formal architectural drawings. 
g) Section 12 (complaints and enforcement) has been amended to reflect
the current status and deadlines with the application process. 
h) Section 13 Variation to Licence was challenged by the ASSC. On review,
the legal advice supports the Council’s position, but suggest that revised
wording would assist to make the position clearer. The revised Policy
adds the following wording to apply to variations of licence where “the
short term host is a corporate entity and the incoming purchaser is added
as a director to that body corporate”. 
5 SHORT-TERM LET LICENSING  UPDATE
5.1 The last year has been challenging as the team were not fully recruited until
March 2023, despite the scheme coming into effect on the 1 October 2023.
Page 163

Page 164

The initial focus was on establishing and training the team, developing
processes and testing the Council’s in-house on-line STL information
management system, whilst responding to enquiries from hosts and
considering applications. Priority given to applications from new hosts as
existing hosts could still operate. The Scottish Government’s decision for a
six-month extension to the deadline for existing hosts to apply for a licence to
the 1 October 2023 was beneficial in managing workload although it has
delayed any consideration of short-term let planning control areas to 2024-25
as the exact number and location of short-term lets will not be known until
after 1 October 2023.  
5.2 There is a period of learning with any new licensing scheme and the last year
has seen amendments to procedures, information to hosts and improvements
to our ICT system. The Scottish Government also issued revised guidance to
local authorities in August 2023. The Council also established regular
meetings with ASSC and Wild Argyll in an effort to work with these agencies,
respond to issues and support the sector across Argyll and Bute. 
5.3 As of the 28 August 2023, the Council had received 780 applications for short-
term lets with 149 being from new hosts entering the sector, issued 158
licences with no refusals. The team are working through a backlog of
applications.  
5.4 With the 1 October 2023 deadline for existing hosts to apply for a licence, the
Council have a communication strategy in place encouraging hosts to make
an application. It is anticipated that there will be in the region of 3,500 hosts
and recruitment is ongoing for temporary staff to augment the SLT team as
the Council have 12 months to determine applications from existing hosts.
Enforcement issues relating to hosts who do not apply but continue trading,
are unknown at this stage but being considered.  
6 CONCLUSIONS
6.1 The Council has adequate arrangements in place to provide a short-term
licensing scheme and the year ahead will be extremely challenging as the
team assess and determine an anticipated 3,500 applications. This is likely to
be impacted by possible enforcement action, delay from hosts, or third party
consultees, in providing the right information and resourcing of the team given
the Government provided the council with no additional resources to do this
work.
6.2 Revisions to the Council’s Short-Term Let Policy are necessary to support
the licensing regime, the sector and to minimise any potential risk of judicial
review. Members are encouraged to approve the revised STL Policy as
detailed in Appendix 1. 
Page 164

Page 165

7 IMPLICATIONS
7.1 Policy Consistent with the Council’s Corporate Plan and statutory
duty.
7.2 Financial The licensing scheme is to be self-financing from income
levels. Estimates used to set fees and will be closely
monitored. Fees will be reviewed regularly and for the next
three year licensing period.
7.3 Legal (1) Meets Council’s new mandatory duty under Civic
Government (Scotland) Act 1982 (Licensing of Short-Term Lets)
Order 2022, and associated guidance.
(2) Recognises expert legal opinion sought by the Council.
7.4 HR Additional temporary posts are being recruited funded by
income.
7.5  Fairer Scotland
7.5.1 Equalities No adverse impact on protected characteristics and scheme
impacts on all providers. 
7.5.2 Socio-
economic
Ensures that let accommodation is safe, applies consistent
standards across all sectors and protects communities.
7.5.3 Islands Licensing scheme will be consistently applied across the whole
of Argyll and Bute.
7.6 Climate
change
Conditions support climate change and environment standards.
7.7 Risk (1) Council’s legal duty will be met on approval of the
scheme.
(2) Inadequate resources are in place to deliver the full
scheme as of the 1 October, and situation will be
managed to ensure we can receive and determine
applications from “new hosts”.
(3) Income does not fully cover expenditure or over-
recovery. This will be monitored.
(4) Reduces the risk of a potential judicial review against
the Council’s STL Policy. 
7.8 Customer
Service
Consistent with customer charter.  
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Policy Lead: Councillor Kieron Green
For further information: Alan Morrison, Regulatory Services and Building Standards
Manager (alan.morrison@argyll-bute.gov.uk.)
13 September 2023. 
Appendix I: Revised Argyll and Bute Short-term Let Licensing Policy 
Page 165

Page 166

This page is intentionally left blank

Page 167

Argyll and Bute Council Short-term Let Licensing Policy v2 Sept 2023
Appendix 1 
Short-term Lets Licensing
Approved Policy Statement 
Page 167

Page 168

Contents 
Foreword
1. Background
2. Timescales for applying
3. Definitions
4. Application and notification
5. Objections and representations
6. Determination of application
7. Right of appeal
8. Licence duration and renewal
9. Licence conditions
10. Temporary exemptions
11. Temporary licences
12. Compliance and enforcement
13. Variation of a licence
14. Suspension and revocation of a licence
15. Planning permission
16. Equality
17. Fees 
Appendix 1 – Contact details
Appendix 2 – Hearing procedure
Appendix 3 – Mandatory conditions
Appendix 4 – Additional conditions
Page 168

Page 169

Foreword 
This policy statement is a revision of the document approved by Argyll and Bute Council
on the 29 September 2022. A copy of the report is available online at Meetings, agendas,
and minutes - Argyll and Bute Council (argyll-bute.gov.uk)
The revised Policy Statement policy provides guidance for applicants, licence holders,
members of the public and Council officers on the licensing system for short-term lets.
This policy statement will be reviewed and revised when necessary. 
Document Management 
Revision Date Approved Reason
STL Policy Statement v1 29 September 2022 Approved by Council  To implement scheme
STL Policy Statement 1.1 10 July 2023 Regulatory Services and
Building Standards
Manager 
Clarification to STL
hearing procedure
Appendix 2 
STL Policy Statement v2 September 2023               
Page 169

Page 170

1. Background 
1.1. On 19th January 2022, The Civic Government (Scotland) Act 1982 (Licensing
of Short-term Lets) Order 2022 (“the Order”) was approved by the Scottish
Parliament. The Order came into force on 1st March 2022 and inserts new
legislative provisions into the Civic Government (Scotland) Act 1982 (“the Act”). 
1.2. The Order introduces a new mandatory licensing system for short-term lets
which local authorities are required to establish by 1st October 2022. 
1.3. Prior to the introduction of the legislation, there was no requirement to licence
short-term lets and, therefore, local authorities did not have the ability to
regulate these types of premises. 
1.4. The licensing scheme was brought in by the Scottish Government with the aim
to ensure short-term lets are safe, address issues faced by neighbours, to
facilitate local authorities in knowing and understanding what is happening in
their area, and handling complaints effectively. It also enables local authorities
to ensure the people providing short-term lets are suitable. The legislation aims
to make sure that the economic and tourism benefits from short-term lets are
balanced with the needs and concerns of local communities. 
2. Timescales for applying 
2.1. New hosts and operators require to have a licence. This means that, if you were
not using your premises to provide short-term lets before 1st October 2022, you
can advertise but not take bookings or receive guests until you have obtained
a licence. 
2.2. Existing hosts or operators (those using accommodation to provide short-term
lets before 1st October 2022) have until 1 October 2023 to apply for a licence.
During this period you can operate without a licence (by continuing to take
bookings and receive guests) unless your licence application has been
determined and refused. 
2.3. After 1st October 2023, existing hosts can only continue to operate if they hold
a short-term let licence, or hold a temporary licence, or have submitted an
application for a licence which is pending determination by the Council.  
Page 170

Page 171

3. Definitions 
3.1. A short-term let is defined in the 2022 Order as the use of residential
accommodation provided by a host in the course of business to a guest, where
all the following criteria are met- 
(a) the guest does not use the accommodation as their only or principal
home,
(b) the short-term let is entered into for commercial consideration,
(c) the guest is not-
(i) an immediate family member of the host,
(ii) sharing the accommodation with the host for the principal purpose of
advancing the guest’s education as part of an arrangement made or
approved by a school, college, or further or higher educational
institution, or
(iii) an owner or part owner of the accommodation,
(d) the accommodation is not provided for the principal purpose of
facilitating the provision of work or services by the guest to the host or to
another member of the host’s household,
(e) the accommodation is not excluded accommodation,
(f) the short-term let does not constitute an excluded tenancy. 
Commercial consideration - this includes money and a benefit in kind (such as a
provision of a service or reciprocal use of accommodation).
Guest – this means a person who occupies accommodation under a short-term let
Host – this means a person who is the owner, tenant or person otherwise in control
over occupation and use of the accommodation
Immediate family member – a guest is deemed to be an immediate family
member of the host if they are-
(a) your partner (spouse, civil partner or someone you live with as if
you were married to them),
(b) you or your partner’s parent, grandparent, child, grandchild or
sibling,
(c) the partner of one of your parents, grandparents, children,
grandchildren or sibling.
Page 171

Page 172

Excluded accommodation – this means accommodation which is, or is part of-
(a) an aparthotel,
(b) premises in respect of which a premises licence within the meaning of
section 17 of the Licensing (Scotland) Act 2005 has effect and where the
provision of accommodation is an activity listed in the operating plan as
defined in section 20(4) of the 2005 Act,
(c) a hotel which has planning permission granted for use as a hotel,
(d) a hostel,
(e) residential accommodation where personal care is provided to residents,
(f) a hospital or nursing home,
(g) a residential school, college or training centre,
(h) secure residential accommodation (including a prison, young offenders
institution, detention centre, secure training centre, custody centre, short-
term holding centre, secure hospital, secure local authority
accommodation, or accommodation used as military barracks),
(i) a refuge,
(j) student accommodation,
(k) accommodation which otherwise requires a licence for use for hire for
overnight stays,
(l) accommodation which is provided by the guest,
(m) accommodation which is capable, without modification, of transporting
guests to another location,
(n) a bothy, or
(o) accommodation owned by an employer and provided to an employee in
terms of a contract of employment or for the better performance of the
employee’s duties. 
3.2. Please note that if you have an HMO licence for your property, you would still
need a short-term let licence if it is also to be used for short-term lets. This is
the case whether or not you live at the premises covered by your HMO licence. 
3.3. Self-catering property in the grounds of a licensed hotel would be excluded. 
It is recommended that short-term let hosts take their own independent legal
advice on whether or not their accommodation would require a short-term let
licence.  The Licensing Authority cannot provide legal advice on whether or not a
premises is excluded from requiring a short-term let licence.
Page 172

Page 173

Excluded tenancy – an excluded tenancy means a tenancy which falls within any of
the following definitions:
(a) protected tenancy (within the meaning of section 1 of the Rent (Scotland)
Act 1984,
(b) an assured tenancy (within the meaning of section 12 of the Housing
(Scotland) 1988 Act),
(c) a short assured tenancy (within the meaning of section 32 of the Housing
(Scotland) Act 1988),
(d) a tenancy of a croft (within the meaning of section 3 the Crofters
(Scotland Act 1993),
(e) a tenancy of a holding situated outwith the crofting counties (within the
meaning of section 61 of the Crofters (Scotland Act 1993) to which any
provisions of the Small Landholders (Scotland) Acts 1886 to 1931(8))
applies,
(f) a Scottish secure tenancy (within the meaning of section 11 of the
Housing (Scotland) Act 2001),
(g) a short Scottish secure tenancy (within the meaning of section 34 of the
Housing (Scotland) Act 2001),
(h) a 1991 Act tenancy (within the meaning of section 1(4) of the Agricultural
Holdings (Scotland) Act 2003),
(i) a limited duration tenancy (within the meaning of section 93 of the
Agricultural Holdings (Scotland) Act 2003),
(j) a modern limited duration tenancy (within the meaning of section 5A of
Agricultural Holdings (Scotland) Act 2003),
(k) a short limited duration tenancy (within the meaning of section 4 of the
Agricultural Holdings (Scotland) Act 2003),
(l) a tenancy under a lease under which agricultural land is let for the
purpose of its being used only for grazing or mowing during some
specified period of the year (as described in section 3 of the Agricultural
Holdings (Scotland) Act 2003),
(m) a private residential tenancy (within the meaning of section 1 of the
Private Housing (Tenancies) (Scotland) Act 2016),
(n) a student residential tenancy. 
Page 173

Page 174

3.4. There are four types of licences for short-term let accommodation. Any licence
granted must be for either- 
(a) Secondary letting, 
(b) Home letting, 
(c) Home sharing, or 
(d) Home letting and home sharing. 
3.5. The different types of licences are defined as follows- 
(a) Secondary letting – this means a short-term let involving the letting of property
where you do not normally live, 
(b) Home letting - this means using all or part of your home for short-term lets whilst
you are absent, 
(c) Home sharing – this means using all or part of your own home for short-term lets
whilst you are there. This includes guest houses or bed-and-breakfast
accommodation within the host’s principal residence. 
Page 174

Page 175

3.6. A separate licence is required for each of your premises. However, a single
licence may be issued in respect of unconventional accommodation where
there is more than one separately bookable property on the site. 
3.7. Dwellinghouse means for these purposes, an independent dwelling (with its
own front door, kitchen and bathroom) such as a house, flat, cottage etc. 
3.8. You do not need a separate licence for short-term lets within the same
dwellinghouse. For example, if you are letting out two rooms in your home,
that would be covered by one licence. 
3.9. Unconventional accommodation – this means residential accommodation
that is not defined as a dwelling house and would include residential
accommodation such as glamping pods and yurts.
Page 175

Page 176

4. Application and notification 
4.1 All applicants must complete an online short-term let licence application form.
The application should be submitted online at Short term lets licence | Argyll and
Bute Council (argyll-bute.gov.uk) Paper applications will be made available upon
request to short-termlets@argyll-bute.gov.uk or Tel: 01546 605519. 
4.2 Applicants require to pay in full the application fee as part of the online application
process or if submitting a paper application form by making a payment to Argyll
and Bute Council by contacting Short-Term Lets on 01546 605519. 
4.3 The Council provides a pre-application checklist on its website to assist applicants
in ensuring that their application includes appropriate details and documentation.
This documentation includes gas and electrical safety certificates, layout drawings
of the property as required by Scottish Fire and Rescue. 
4.4 Under the terms of the Act, all applicants who apply for a short-term let licence must
display a notice for a period of 21 days beginning with the date on which the
application was submitted to the licensing authority, at or near the property to which
the application relates, so that it can be conveniently read by the public. 
4.5 The notice shall state that an application has been made for a licence, the main
facts of the application, that objections and representations in relation to the
application may be made to the licensing authority and how to make objections
or representations. A template will be provided to the applicant once an
application is submitted. 
4.6 Applicants are required to certify compliance that they have displayed the site
notice as soon as possible after the 21 days has expired. A template will be
provided to the applicant once an application is submitted. 
4.7 A copy of the application will be sent to Police Scotland and the Scottish Fire
and Rescue Service by the local authority. A copy will also be made available
to: 
 Argyll and Bute Council’s Planning Department
 Argyll and Bute Council’s Building Standards service
 Argyll and Bute Council’s Environmental Health service
 Loch Lomond and the Trossachs Parks Authority (where the property is within
the National Park) 
4.8 All personal data will be processed in line with the following privacy notices: 
https://www.argyll-bute.gov.uk/privacy/civic-government-licensing 
Page 176

Page 177

4.9 Licensing authorities have 9 months to process applications from new
hosts and 12 months for existing hosts during the transitional period. 
4.10  The licensing authority will take into consideration the following when
assessing occupancy – size and type of property, number of bedrooms,
maximum number that can be accommodated safety and potential for noise
nad nuisance to neighbours.
Page 177

Page 178

5 Objections and representations 
5.1 The 1982 Act permits any member of the public to submit an objection or
representation in relation to an application for a short-term let licence. 
5.2 To enable Argyll and Bute Council, as licensing authority (“the Council”)
to entertain an objection or representation, it must be: 
(a) in writing (email is sufficient),
(b) specify the grounds of the objection or the nature of the
representation,
(c) specify the name and address of the person making it,
(d) be signed off by them or on their behalf,
(e) be received by the Council within 28 days from when the notice
of application is displayed. 
5.3 Anonymous objections or representations will not be considered. “Anonymous”
includes objections or representations where the person making the objection or
representation cannot be contacted using the contact information provided. 
5.4 Late objections or representations may be considered, entirely at the Council’s
discretion, if the Council is satisfied that there is sufficient reason as to why it
was not made in the time required. 
5.5 The objection should be relevant to the statutory grounds that can be taken into
consideration when refusing an application. These are set out in the 1982 Act- 
(a) the applicant or anyone else detailed in the application form is not a fit
and proper person to be the holder of a licence,
(b) the activity would be carried out by a person other than the applicant
who, if he had made the application himself, would have been refused,
(c) the premises is not suitable for the conduct of the activity, having regard
to-
(i) the location, character or condition of the premises,
(ii) the nature and extent of the proposed activity,
(iii) the kind of persons likely to be in the premises,
(iv) the possibility of undue public nuisance, public order;
or public safety,
(v) where there is other good reason 
5.6 It should detail clearly the reasons for the objection/representation and why the
applicant and/or the premises are not suitable. 
5.7 A copy of the objection or representation will be provided to the applicant and
will include your name and address. All personal data will be processed in line
with the following privacy notice: 
https://www.argyll-bute.gov.uk/privacy/civic-government-licensing
Page 178

Page 179

6 Determination of application 
6.1 Everybody named on the application form will be subject to the fit and proper
test. Every application form will require consultation with Police Scotland who
will carry out background checks. 
6.2 Licensing authorities are responsible for determining whether you are a fit and
proper person to be the holder of a licence for short-term lets. Consideration
will be given to a wide range of information including relevant criminal
convictions, other relevant information provided by Police Scotland, any
previous disqualifications from being a private landlord, previous revocations
of a HMO licence and providing false or misleading information in your
application form. 
6.3 If there are no objections or adverse representations to a short-term let licence
application, the application will be determined under delegated powers by the
Executive Director with responsibility for Regulatory Services. 
6.4 If an objection or adverse representation is submitted in relation to the short-
term let licence application and, this cannot otherwise be resolved, the
application will be subject to a hearing at a meeting of the Council’s Planning,
Protective Services and Licensing Committee. 
6.5 The person submitting the objection or representation will be invited to attend
the meeting of the Planning, Protective Services and Licensing Committee and
speak to their objection/representation. You will be given at least 14 days’
notice of the hearing date. 
6.6 The applicant or their representative will be invited to attend the meeting and
given the opportunity to state why the application should be granted. 
6.7 The Committee will be able to ask questions of both parties and, thereafter,
decide whether to grant or refuse the application. The grounds for refusing an
application are set out at paragraph 5.5. 
6.8 Applications will be heard in public unless required to be taken privately on the
grounds of disclosure of exempt information as defined in Part 1, Schedule 7A
of the Local Government (Scotland) Act 1973. 
6.9 A copy of the Council’s hearing procedure can be found at Appendix 2. 
6.10 Both the applicant and the person(s) making an objection/representation can
request a statement of reasons for the decision within 21 days of the date of the
decision. The statement of reasons will be provided within 10 days of that request.
Page 179

Page 180

6.11 If your application for a licence is refused, you cannot reapply for a
licence within 1 year of that decision, unless there has been a material change
in your circumstances since then. 
7 Right of appeal 
7.1 The applicant and the person(s) making an objection/representation have a
right of appeal to the Sheriff Court. 
7.2 However, they only have this right if they have taken every opportunity to state
their case to the Committee as has been made available. 
7.3 The Sheriff can uphold an appeal only if the sheriff considers that the licensing
authority erred in law, based their determination on any incorrect material fact,
acted contrary to natural justice or exercised their discretion in an unreasonable
manner. 
7.4 Any appeal must be lodged by way of a summary application with the relevant
Sheriff Clerk’s office within 28 days of the date of the decision appealed against. 
7.5 Parties should seek their own independent legal advice in relation to an appeal. 
8 Licence duration and renewal 
8.1 The duration of the licence applies from the date on which the licence comes
into force. This will be specified on the licence together with the expiry date of
the licence. 
8.2 When an application is made to renew a licence timeously, the existing licence
will continue in effect until such time as a decision is made on the renewal
application. 
8.3 A licence shall have effect- 
 for a period of 3 years from the date when it comes into force; or
 for such shorter period as the licensing authority may decide at that time when
they grant; or
 for such longer period as the licensing authority may decide at the time when
they renew a short-term let licence
Page 180

Page 181

8.4 The Scottish Government’s guidance for licensing authorities on short-term lets
has made it clear that licensing authorities are encouraged to renew licences
for a period of 3 years, unless they have good reasons to do otherwise. 
8.5 Whilst each application will be decided on its own merits, it is not anticipated
that licences will be renewed for a period of longer than 3 years. 
9 Licence conditions 
9.1 The Act sets out a number of mandatory licence conditions which apply to all
short-term let across Scotland. A list of these conditions can be found at
Appendix 3. 
9.2 In addition to the mandatory licence conditions which apply to all short-term
lets, licensing authorities may impose additional conditions. These enable the
licensing authority to respond to local challenges and concerns relative to
specific types of short-term letting. 
9.3 There are a number of additional conditions which will apply to all short-term
let properties. There also some specific additional conditions which may only
apply to certain types of short-term let properties or to properties following
investigation of concerns. A list of the additional licence conditions which may
apply to your short-term let licence can be found at Appendix 4. 
10 Temporary exemptions 
10.1 The Council will not be granting temporary exemptions under any circumstances. This
position will be kept under review 
11 Temporary licences 
11.1 The Council may consider granting temporary licences in limited
circumstances.  For example:- 
 to ensure that short-term lets can continue as going concerns when being
sold from one operator to another. 
11.2 A temporary licence should be made online or where agreed, by way of paper
application.  Details for the application process are set out in Section 3. 
11.3  Temporary licences may be granted for a duration of up to 6 weeks. A
temporary licence cannot be renewed. However, if a host or operator applies for
a full licence during the period of a temporary licence, the temporary licence
duration will extend until their full licence application has been determined. 
11.4 A temporary licence number will be given, and conditions attached to the  
licence must be complied with. 
Page 181

Page 182

11.5 The Council must consult the Chief Constable and Scottish Fire and Rescue in
respect of an application for a temporary licence. 
12 Compliance and enforcement 
12.1 Unlicensed short-term lets 
12.1.1 It is a criminal offence to carry on an activity for which a licence is
required without having a licence and without reasonable excuse. 
12.1.2 The Scottish Government has set out the following timescales for
hosts and operators. Please note the rules are different depending on
whether you are a new host/operator or an existing host/operator- 
New hosts/operators -  you cannot operate while your short-term let
application is being determined.
Existing hosts/operators
 Existing hosts/operators must apply for a short-term let licence by 1st
October 2023, at the latest. 
 If you have been trading on or before 30th September 2022, you may
continue to operate if you have made a licence application by 1st
October 2023 or hold a temporary licence.. 
 You can continue to operate for the time it takes for your licence
application to be finally determined. 
 A provisional licence number will be provided once the application is
duly-made. 
 It will be an offence to offer short-term let accommodation after 1st
January 2025 unless you hold a licence or unless a sheriff has
provided an extension to the processing time for an application from
an existing host.
Page 182

Page 183

12.1.3 The Council will maintain a public register of short-term let licence
applications and licences granted. This will allow members of the public to
check the licensing status of a premises being used as a short-term let. 
12.1.4 Complaints about suspected unlicensed hosts/operators should
be directed to  short-termlets@argyll-bute.gov.uk 
12.2 Licensed short-term lets 
12.2.1 Hosts and operators must ensure that any advert or listing placed
on or after they are granted a licence, or a provisional licence number,
includes their licence number. 
12.2.2 Hosts and operators must ensure that they comply with all the
mandatory and any additional conditions on their licence. It is a criminal
offence to fail to comply with a licence condition if a licence holder has not
used all due diligence to prevent the offence. 
12.2.3 It is also a criminal offence for a licence holder, without
reasonable cause, to fail to notify the licensing authority of a material
change of circumstances. 
12.2.4 The Council may undertake premises site visits as part of the
application process and throughout the duration of the licence to ensure
compliance with licence conditions. 
12.3 Complaints about licensed short-term lets 
12.3.1 In the first instance, guests should raise any concerns about their
short-term let with their host/operator or letting agent/platform. If the issue
is sufficiently severe, then the Council may become involved. 
12.3.2 A complaint must be relevant to the matters that the Council can
take into consideration. Frivolous or vexatious complaints will not be
considered. 
12.3.3 The Council can consider matters relating to the suitability of the
licence holder, threats to public safety or public order or whether a
condition of the licence has been contravened. 
12.3.4 These issues would include a host/operator exceeding the
number of people staying at the premises, serious disturbance or antisocial
Page 183

Page 184

behaviour or concerns about the maintenance and safety of the premises.
These complaints can be directed to short-termlets@argyll-bute.gov.uk 
12.3.5 Please note that the Council cannot consider complaints in
relation to the quality of a guest’s stay or specific contractual matters
between the guest and the host/operator as this is outside the scope of the
licensing scheme. 
12.3.6 Complaints will aim to be acknowledged within 5 working days. A
full response advising you of the outcome may take some time if the
complaint requires further investigation. The complaint may also need to
be directed to other departments within the Council other services such as
Police Scotland or Scottish Fire and Rescue Service for input.
Complainants will be kept up to date with progress if there is a delay in a
full response being provided. 
12.3.7 Premises site visits may be undertaken by the Council as part of
an investigation into a complaint. 
12.4 Enforcement 
12.4.1 It is possible that some complaints may require enforcement
action from the Council. 
12.4.2 The Act provides for several options for enforcement action if
justified. This includes additional licence conditions being attached,
enforcement notices or variation, suspension or revocation of the licence
or in more serious circumstance pursuing a prosecution. 
12.4.3 The Council recognises the importance of having compliance
issues monitored in order to ensure licensed Short-term lets are complying
with licence standards and not causing an unnecessary nuisance to the
community, nearby residents or neighbours. As such it will carry out a risk-
based approach to enforcement, using a range of escalating informal
measures, prior to an Enforcement Notice being issued and subsequently
a complaint being made to the Committee in relation to the STL licence. 
12.4.4 An enforcement notice will set out the matters constituting a
breach or likely breach, the action required to rectify or prevent the
breach and the date by which the action must be taken. 
12.4.5 If the matter is not addressed satisfactorily by the licence holder,
the Council may then consider a variation, suspension or revocation of
the licence. 
12.4.6 You will not be charged a fee for a routine visit. However, you will
be charged if a follow up visit is necessary because you have breached
one of your licence conditions.
Page 184

Page 185

13 Variation of a licence 
13.1 A licensing authority may, at any time, whether or not upon an
application made to them by the holder of the licence, vary the terms on any
grounds they think fit. 
13.2 A variation application cannot, however, be used to substitute a new
holder of the licence for the existing one (i.e. effectively to transfer a licence)
but would apply where the short-term let host is a corporate entity, and the
incoming 
14 Suspension or revocation of a licence 
14.1 A licensing authority may, whether upon a complaint made to them or
not, suspend or revoke a licence. 
14.2 A licensing authority may order the suspension or revocation of a
licence if in their opinion- 
 the holder of the licence is no longer a fit and proper person to hold the
licence
 the licence holder is managing the property on behalf of someone who
would have been refused the grant or renewal of the licence 
 the short-term let is causing or is likely to cause undue public nuisance or
a threat to public order or public safety; or 
 a condition of the licence has been contravened 
14.3 The period of suspension can be the unexpired portion of the duration
of the licence, or such shorter period as the licensing authority may fix. The
effect of the suspension shall be that the licence shall cease to have effect
during the period of suspension. 
Page 185

Page 186

15 Planning permission 
15.1 The requirement for planning permission is a separate matter from
licencing of short-term lets.  Whether or not planning permission is required for
the use of a dwelling for short- term let purposes will firstly depend on whether
it is located within a Short-Term Letting Control Area. Outwith control areas,
the requirement for planning permission would be a matter for the planning
authority to determine on a case by case basis, depending on the nature and
circumstances of the property and the manner in which it is operated.  Hosts
and operators must comply with both planning and licensing law. 
15.2 The Council is the relevant planning authority for the Argyll and Bute
area located outwith the Loch Lomond and the Trossachs National Park. The
National Park Authority is the planning authority for the full extent of the Loch
Lomond and the Trossachs National Park designation. 
Short-Term Letting Control Areas: 
15.3 There is a separate legislative process from licensing which allows the  
Council and the National Park Authorities, as planning authorities, to
establish short-term let control areas.  The purpose of control areas is to
help planning authorities manage high concentrations of secondary letting
(where it affects the availability of residential housing or the character of a
neighbourhood) and to restrict or prevent short-term lets in places or types of
buildings where it is not appropriate. 
15.4  Within a control area designated by a planning authority, use of a
property for short-term letting will always require express planning permission.
The host or operator must make an application for planning permission or
already have planning permission before they apply for a licence. 
15.5 There are currently no Control Areas within Argyll and Bute and the
Council and Loch Lomond and the Trossachs National Park does not
propose to designate any Short-Term Letting Control Areas at this time,
but will review this position in the course of 2023/25 
15.6        Please note that planning authorities could designate control areas after a     
premise has already obtained a short-term let licence. Licence holders would   be
given a reasonable opportunity to comply with the mandatory condition by
submitting a planning application or application for a Certificate of Lawful Use or
Development (CLUD) as soon as possible after the control area is
designated. If a CLUD or planning permission is refused, this may result in the
licence being refused, varied or revoked as appropriate. 
Page 186

Page 187

Outwith Control Areas: 
15.7 Outside of a control area, it is for the planning authority to consider
whether any change of use of a dwelling house is material and, therefore,
requires planning permission, although you may also require permission
where a premises has resulted in the subdivision of a residential plot where
it is an annex or garage that has been converted. This is determined on a
case by case basis and will depend very much on the nature of the dwelling
to be let, its relationship to neighbouring land uses, its servicing
arrangements, and the manner in which the property will be operated. 
15.8 Hosts and operators are, therefore, encouraged to engage with the
relevant planning authority prior to submitting a licence application to
confirm whether they require planning permission or a certificate of lawful
use of development. 
Detailed enquiries can be submitted for review and assessment through the
Council’s chargeable pre-application advice service: Pre-Application Guidance
(argyll-bute.gov.uk) 
Contact details for Loch Lomond and the Trossachs National Park planning
service:
Planning - #LetsDoNetZero -Loch Lomond & The Trossachs National Park
(lochlomond-trossachs.org) 
Page 187

Page 188

16 Equality 
16.1The Equality Act 2010 Act introduced a new public sector equality duty
which requires public authorities, including the Committee, to try and eliminate
discrimination, promote equality and good relations across a range of
protected characteristics. 
16.4 Prior to the Committee implementing this policy an equality impact
assessment was undertaken. This can be viewed using the following link [
Equality and Socio-Economic Impact Assessments (argyll-bute.gov.uk)
Page 188

Page 189

17 Fees 
17.1Licensing authorities are required to charge fees in respect of processing
and determining, the consideration of applications, the issue of duplicate
licences and other matters. They must ensure that the fees are sufficient to
cover their administrative expenses and are reviewed periodically. 
17.2Licensing fees are non-refundable. Whether or not a licensing application
is granted, the Council incurs significant costs in processing the application. 
17.3The Council has considered the following criteria in the process of
determining the fees: 
 The size of the premises
 The number of rooms at the premises
 The number of guests who can reside at the premises
 The type of short-term let 
17.4 Licence fees are set by the Council annually as part of the budget
process. Fees and charges is available via this link to the Councils website.
(Council fees and charges | Argyll and Bute Council (argyll-bute.gov.uk) 
17.5 For indicative purposes the application and renewal fees for short term
let licensing for 2023/24 are shown below: 
Application and renewal – full licence 
Guest capacity applied for
(including children under the age
of 10)
Home sharing or
home letting
licence
Secondary letting
licence
Up to 4  £239.55  £334.95
5 to 8  £334.95   £479.10
9 to 12  £526.80  £718.70
13 to 20   £671.00   £958.25
21 and over  £862.85   £1197.80 
Other types of application Fee
Temporary licence application 50% of fee
Temporary exemption application] 50% of fee
Variation of licence / change in circumstances  £81.60
Duplicate licence   £43.45 
Page 189

Page 190

Enforcement costs Fee
Officer hourly cost in 15 minute intervals (Inspection of a premises
where concern is flagged at the application process by a consultee
£99.50- /hour
**Where a fee is charged for such a visit, a report must be
provided to the host or operator within 28 days of the inspection,
unless otherwise agreed. Otherwise, the fee must be refunded to
the licence holder*** 
.17.6  The fee charged is weighted according to the following factors, where the unit fee
is the cost of dealing with an application for 5-8 person secondary let licence.
Applications for premises with larger numbers of guests are likely to require more
enquiries, or attract more representations, or objections, which require to be dealt
with as part of the application.
Guest capacity
(People)
Home sharing and
home letting licence
Secondary let
licence
Up to 4 0.5 0.7
5 to 8 0.7 1.0
9 to 12 1.1 1.5
13 to 20 1.4 2.0
21 and over  1.8 2.5
Page 190

Page 191

Appendix 1 – Contact details 
Telephone – 01546 605519  
Email – Short-termlets@argyll-bute.gov.uk  
Postal Address – Short-Term Lets Licensing, Argyll and Bute Council, Kilmory,
Lochgilphead, Argyll, PA31 8RT 
Page 191

Page 192

Appendix 2 – Hearing procedure 
SHORT TERM LET LICENSING PROCEDURE FOR HEARINGS 
Applications will be heard in public unless required to be taken privately on the
grounds of disclosure of exempt information as defined in Paragraph 3 of Part 1 of
Schedule  7A of the Local Government (Scotland) Act 1973. 
1. The Chair will welcome, introduce everyone, outline the procedure and receive 
confirmation that both the Applicant and objector(s) accept the hearing procedure. 
If the representations/objection(s) were submitted timeously and there are no spent 
convictions to be considered, then proceed directly to number 4. 
2. If the representation/objection (from the Police or any other party) has been 
received late the Committee must hear details as to why the 
representation / objection was late and be satisfied that there is sufficient reason
why it was not made in the time required. If they agree that, then the 
representation/ objection can be heard, otherwise it should be disregarded. The 
process to be followed should be that the objector is invited to provide reasons as
to why the submission was late. Members may ask any follow up questions of the 
objector. The applicant must then be asked if they have any objections to the late
submission being accepted. The Committee must take all comments into account 
when deciding whether to accept the late submission. 
3. If spent convictions are to be referred to then the guidance notes for spent 
convictions should be followed for each conviction. 
4. The hearing procedure below should now be followed: 
a The Licensing Officer will present the report to the Committee
b The applicant or Agent, will be given the opportunity to speak in support
of their 
application.
C Any objector, or Agents, will have the opportunity to question the
Applicant or 
Agent on matters related only to their presentation.
d Objectors, or their Agents, will have the opportunity to speak in support
of their 
objection
E The Applicant, or Agent, will have the opportunity to question any
Objector, or 
Agent, on matters related only to their presentation.
f The Committee Members, through the Chair may ask questions of the
Applicant or Objector or their Agents for clarification
g The Chair will invite the Objector, or Agent to briefly summarise their
points if 
they wish.
h The Chair will invite the Applicant, or Agent to briefly summarise their 
points if they wish.
I The Chair will confirm that everyone has had a fair hearing
Page 192

Page 193

j The Committee will debate and determine the application in the presence
of 
Applicant/Objector. 
DECISION 
1. A determination of the case will be made at the conclusion of the hearing
and all parties will be notified of the decision in writing within 7 days of the
hearing and shall be advised of his/her right to seek written reasons and
appeal to the Sheriff Court.
2. If the decision of the Committee is to suspend, refuse or refuse to suspend
a licence, a relevant person has a right to request within 28 days of the
meeting, the Committee’s reasons for arriving at their decision. Unless the
circumstances of the case justify immediate suspension, the suspension
shall not take effect for 28 days from the date of the decision.
3. Appeals against the decision of the Committee must be lodged with the
Sheriff Clerk within 28 days of the date of the decision
Page 193

Page 194

Appendix 3 – Mandatory licence conditions 
Agents
1. Only those named as a holder of the licence can carry out the day to day
management of the short-term let of the premises.
Type of licence
2. The holder of the licence may only offer the type of short-term let for which the
licence has been granted.
Fire safety
3. The holder of the licence must ensure the premises has satisfactory equipment
installed for detecting, and for giving warning of—
(a) fire or suspected fire, and
(b) the presence of carbon monoxide in a concentration that is hazardous to health.
4. The holder of the licence must keep records showing that all upholstered
furnishings and mattresses within the parts of the premises which are for guest use,
or to which the guests are otherwise permitted to have access, comply with the
Furniture and Furnishings (Fire Safety) Regulations 1988.
Gas safety
5. Where the premises has a gas supply—
(a) the holder of the licence must arrange for an annual gas safety inspection of all
gas pipes, flues and appliances in the premises,
(b) if, after an annual inspection, any appliance does not meet the required safety
standard, the holder of the licence must not allow a short-term let of the premises
until the works necessary to bring the appliance to the required safety standard have
been carried out.
Electrical safety
6. Where there are electrical fittings or items within the parts of the premises which
are for guest use, or to which the guests are permitted to have access, the holder
of the licence must—
(a) ensure that any electrical fittings and items are in—
(i) a reasonable state of repair, and
(ii) proper and safe working order,
(b) arrange for an electrical safety inspection to be carried out by a competent person
at least every five years or more frequently if directed by the competent person,
(c) ensure that, following an electrical safety inspection, the competent person
produces an Electrical Installation Condition Report on any fixed installations,
(d) arrange for a competent person to—
Page 194

Page 195

(i) produce a Portable Appliance Testing Report on moveable appliances to which a
guest has access, and
(ii) date label and sign all moveable appliances which have been inspected.
7. In determining who is competent, the holder of the licence must have regard to
guidance issued by the Scottish Ministers under section 19B(4) of the Housing
(Scotland) Act 2006(2).
Water safety: private water supplies
8. Where the premises are served by a private water supply, the licence holder
must comply with the requirements on the owners of private dwellings set out in the
Water Intended for Human Consumption (Private Supplies) (Scotland) Regulations
2017
Water safety: legionella
9. The holder of the licence must assess the risk from exposure to legionella within
the premises, whether or not the premises are served by a private water supply.
Safety & repair standards
10.(1) The holder of the licence must take all reasonable steps to ensure the
premises are safe for residential use.
(2) Where the premises are subject to the requirements of Chapter 4 of Part 1 of the
Housing (Scotland) Act 2006, the holder of the licence must ensure that the
premises meet the repairing standard.
Maximum Occupancy
11. The licence holder must ensure that the number of guests residing on the
premises does not exceed the number specified in the licence.
Information to be displayed
12. The holder of the licence must make the following information available within
the premises in a place where it is accessible to all guests—
(a) a certified copy of the licence and the licence conditions,
(b)fire, gas and electrical safety information,
(c) details of how to summon the assistance of emergency services,
(d) a copy of the gas safety report,
(e) a copy of the Electrical Installation Condition Report, and
(f) a copy of the Portable Appliance Testing Report.
Planning Permission
13. Where the premises is in a short-term let control area for the purposes of section
26B of the Town and Country Planning (Scotland) Act 1997 (“the 1997 Act”), the
holder of the licence must, where the use of the premises for a short-term let
requires planning permission under the 1997 Act, ensure that either—
(a) an application has been made for planning permission under the 1997 Act and
has not yet been determined, or
(b) planning permission under the 1997 Act is in force.
Page 195

Page 196

Listings
14.(1) The holder of the licence must ensure that any listing or advert (whether
electronic or otherwise) for the short-term let of the premises includes—
(a) the licence number, and
(b) a valid Energy Performance Certificate rating if an Energy Performance
Certificate is required for the premises, in accordance with the Energy Performance
of Buildings (Scotland) Regulations 2008
(2) The holder of the licence must ensure that any listing or advert (whether
electronic or otherwise) for the short-term let of the premises is consistent with the
terms of the short-term let licence.
Insurance
15. The holder of the licence must ensure that there is in place for the premises—
(a) valid buildings insurance for the duration of the licence, and
(b) valid public liability insurance for the duration of each short-term let agreement.
Payment of fees
16. The holder of the licence must pay any fees due to the licensing authority in
respect of the licence on demand.
False or misleading information
17. The holder of the licence must not provide any false or misleading information
to the licensing authority.
Interpretation
18. In this schedule—
“Electrical Installation Condition Report” means a report containing the following
information—
(a) the date on which the inspection was carried out,
(b) the address of the premises inspected,
(c) the name, address and relevant qualifications of the person who carried out the
inspection,
(d) a description, and the location, of each installation, fixture, fitting and appliance
inspected,
(e) any defect identified,
(f) any action taken to remedy a defect,
“Energy Performance Certificate” means a certificate which complies with
regulation 6 of the Energy Performance of Buildings (Scotland) Regulations 2008,
“Gas safety report” means a report containing the following information—
(a) the date on which the appliance or flue was checked,
(b) the address of the premises at which the appliance or flue is installed,
(c) a description of and the location of each appliance or flue checked,
Page 196

Page 197

(d) any safety defect identified,
(e) any remedial action taken,
(f) confirmation that the check undertaken complies with the requirements of an
examination of—
(i) the effectiveness of any flue,
(ii) the supply of combustion air,
(iii) subject to head (iv), its operating pressure or heat input or, where necessary,
both,
(iv) if it is not reasonably practicable to examine its operating pressure or heat input
(or, where necessary, both), its combustion performance,
(v) its operation so as to ensure its safe functioning,
(g) the name and signature of the individual carrying out the check, and
(h) the registration number with which that individual, or that individual’s employer, is
registered with a body approved by the Health and Safety Executive for the purposes
of regulation 3(3) of the Gas Safety (Installation and Use) Regulations 1998,
Page 197

Page 198

Appendix 4 – Additional licence conditions 
Short-term Lets: Proposed Additional Conditions
Introduction
Argyll and Bute Council consider that additional conditions should be applied to
short-term let licences in its area. These derive from (a) the Part 2 Guidance for
licensing authorities and (b) issues relating to guest safety which the Council has
identified in its area and for which it considers additional licence conditions are
necessary and appropriate.
The “Part 2” additional conditions, are based closely upon the examples provided
by the Scottish Government. These conditions would be generally-applicable to all
licences, although some, for instance those relating to impact noise are not
necessary for detached premises with no party structures.
The guest safety conditions are intended for specific premises where certain
facilities and amenities are provided for the use of guests (this would require a
declaration on the application form). Alternatively, the conditions could be
generally-applied with a conditional clause; the draft guest safety conditions are in
the latter form.
Antisocial behaviour
1. The licence holder must take reasonable steps to manage the premises in
such a way as to seek to prevent and deal effectively with any antisocial
behaviour by guests to anyone else in the short-term let and in the locality
of the short-term let.
2. The licence holder must take reasonable steps to:
 Ensure that no disturbance or nuisance arises within or from the
premises, for example by explaining the house rules to the guests;
 Deal effectively with any disturbance or nuisance arising within or from
the premises, as soon as reasonably practicable after the licence holder
is made aware of it; and
 Ensure that any vehicles belonging to guests are parked lawfully, for
example explaining where any designated parking spaces are to be
found and highlighting any local rules.
4. The licence holder must take reasonable step to ensure that guests do not play
amplified music within the garden or external areas where or at times it would
impact neighbouring residents. 
Privacy and security
1. The licence holder must manage the premises in such a way as to respect
and protect the privacy and security of neighbours.
2. The licence holder must ensure:
Page 198

Page 199

 Guests know and understand any particular rules applying to shared
areas and entrances;
 Guests understand that shared doors should be properly and securely
closed after use; and
 The provision of access codes or keys to guests cannot be used by
guests to gain access to shared areas after they have finally departed.
Noise control in flatted premises
1. Where the premises are a flat above another dwellinghouse, the licence
holder must:
 Fit and maintain carpets (with appropriate underlay) to the floors of
bedrooms, living room and any hallway.
 Take reasonable steps to ensure that guests do not first arrive or finally
depart from the property between the hours of 2300 and 0700. The
licence holder must advise guests of this condition as part of their
booking terms and conditions.
2. The licensing authority may, at its own discretion, exempt any flatted
premises from the requirement to carpet floors where the licence holder
can demonstrate that they have been built to or been converted to
Domestic Technical Standard 5.1.
3. Note that “reasonable steps” allows for unavoidable circumstances, such
as significantly-delayed transport.
Littering and waste disposal
1. The licence holder must provide adequate information on, and the facilities
for, the storage, recycling and disposal of waste.
2. The licence holder shall be responsible for advising residents of the refuse
collection day and for making arrangements for the presentation of bins for
collection at the appropriate time and day.
3 The licence holder must advice guests of:
 Their responsibilities;
 The use of the bins etc. provided for the premises; and
 The location of the nearest recycling area or recycling point.
4. The licence holder must:
 Clearly label bins as belonging to the premises;
 Ensure that guests manage their waste in compliance with (2), including
when they depart; and
 Maintain the bins storage area and the exterior of the premises in a
clean and tidy condition. 
Page 199

Page 200

Damage to property
The licence holder shall not affix a key box, or any other device to facilitate guest
entry to the premises, to any public or jointly-owned private structure or
infrastructure without the prior written permission of the relevant authority or
owner(s). The licence holder must be able to produce the written permission to the
licensing authority on demand. 
Additional Conditions for Guest Safety 
Legionella risk assessment – spa pools/hot tubs
1. Where a spa pool, including any electric hot tub or wood-fired hot tub, is
provided for the use of guests, the licence holder must install, maintain and
operate it so it can be safely operated and used by guests. 
2. The licence holder shall ensure, so far as is reasonably practicable:
 That any such spa pool is installed and maintained in accordance with
the guidance in HSE publication HSG282 Control of legionella and other
infectious agents in spa-pool systems.
 That there is a risk assessment and written scheme of control for
Legionella in respect of any such spa pool.
 That the risk assessment and written scheme of control are lodged with
any application for a licence and are to the satisfaction of the licensing
authority.
 That, prior to any spa pool being brought into use for the first time
during the period of the licence, at least 28 days’ notice shall be given to
the licensing authority and the risk assessment and written scheme of
control shall be submitted at the time of such notice.
3. The licence holder shall provide guests with information on the safe use of
the spa pool in accordance with the written scheme of control.
4. The licence holder shall not provide or install any inflatable hot tub for the
use of guests without the prior written approval of the licensing authority.
Note that the licensing authority will not give approval in respect of
inflatable hot tubs not intended for commercial use and which cannot
conform to the requirements of HSG282.
Guest safety – swimming pools and ponds
1. Where a swimming pool or swimming pond is installed and provided for the
use of guests, the licence holder must take reasonable measures to ensure
water quality and bather safety.
2. The licence holder shall ensure:
 In the case of swimming pools, and swimming ponds, that a pool safety
operating plan is prepared and lodged with any application for a licence
Page 200

Page 201

and is to the satisfaction of the licensing authority. The licence holder
shall have regard to the guidance in HSE publication HSG179 Health
and safety in swimming pools.
 In the case of swimming pools and swimming ponds, that a bather
safety plan is prepared and lodged with any application for a licence
and is to the satisfaction of the licensing authority. The bather safety
plan shall include measures to minimise the risk of bathers getting into
difficulty, to facilitate the rescue of bathers in difficulty and to call for the
assistance of emergency services where necessary.
 That, prior to any swimming pool or pond being brought into use for the
first time during the period of the licence, at least 28 days’ notice shall
be given to the licensing authority and the pool safety operating plan
and bather safety plan shall be submitted at the time of such notice.
3. In this condition, “swimming pond” means an outdoor body of untreated
water in natural ground which has been excavated or modified to provide a
facility for swimming. It does not include natural watercourses, fresh-water
lochs or coastal waters.
4. This condition does not apply to swimming pools which are staffed and
operated with continuous poolside supervision by trained lifeguards.
Risk of Carbon monoxide – barbecue huts
1. Where a barbecue hut is installed and provided for the use of guests, the
licence holder must take reasonable steps to ensure that the risk from
Carbon monoxide is minimised.
2. The licence holder shall, so far as is reasonably practicable:
 Install, maintain and operate the barbecue hut only in accordance with
the manufacturer’s instructions.
 Install and maintain in proper working condition a Carbon monoxide
monitor and alarm within the barbecue hut.
 Provide guests with instructions on the safe use of the barbecue hut,
the symptoms of Carbon monoxide poisoning and the actions to be
taken in an emergency.
 Not permit the use of the barbecue hut by persons under the age of 18
except in the presence of a person over the age of 18.
 Not permit the use of a barbecue hut as sleeping accommodation.
3. For the purposes of this condition, a barbecue hut is a purpose-built,
structure including a fixed hearth, and fixed ventilation supplying both fresh
air to the hearth and extracting the products of combustion from the occupied
space. 
.
Page 201

Page 202

This page is intentionally left blank

Page 203

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE SERVICES 
AND LICENSING COMMITTEE 
LEGAL AND REGULATORY SUPPORT                            20 SEPTEMBER 2023 
IMPLICATIONS OF THE INTRODUCTION OF THE FIREWORKS AND
PYROTECHNIC ARTICLES (SCOTLAND) ACT 2022 WITH RESPECT TO
FIREWORK CONTROL ZONES 
1.0 EXECUTIVE SUMMARY
Part 6 of the Fireworks and Pyrotechnic Articles (Scotland) Act 2022 was brought into
force on 22nd June 2023. This part of the act confers discretionary powers on local
authorities to designate a place within their area as a Firework Control Zone (FCZ), and
make provision as to how those powers are to be exercised.
This report sets out:
1. Changes to existing legislation; and
2. The new discretionary powers available to the council.  
Page 203 Agenda Item 12

Page 204

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE SERVICES 
AND LICENSING COMMITTEE
LEGAL AND REGULATORY SUPPORT   20 SEPTEMBER 2023       
IMPLICATIONS OF THE INTRODUCTION OF THE FIREWORKS AND
PYROTECHNIC ARTICLES (SCOTLAND) ACT 2022 WITH RESPECT TO
FIREWORK CONTROL ZONES 
2.0 INTRODUCTION 
2.1 In 2019, the Scottish Government launched a national public consultation on
fireworks. 16,420 responses were received, displaying a widespread interest from
members of the public and stakeholder organisations. Analysis of these
responses demonstrated a strong desire for change in the relationship that
Scotland has with fireworks, and a desire for greater restrictions on the sale and
use of fireworks.
2.2 In response, the Scottish Government established a Firework Control Group. This
group considered legislative options for change, and made a series of
recommendations.
2.3 These recommendations have resulted in new enforcement responsibilities being
placed on both Police Scotland & Argyll & Bute Council.
3.0 RECOMMENDATIONS 
3.1 That Members;
3.1.1   Note the provisions of the Fireworks and Pyrotechnic Articles (Scotland) Act 2022
and particularly the matter of Firework Control Zones; 
3.1.2 Agree that there is, currently, no requirement to designate any area as a Firework
Control Zone; and
3.1.3   Agree that officers will look at establishing a portal with supporting information for
“Community Requests” for a Firework Control Zone as set out in para 4.10. 
Page 204

Page 205

4.0 DETAIL 
4.1 A number of the Fireworks Control Group's recommendations were taken forward
through The Fireworks (Scotland) Miscellaneous Amendments Regulations 2021.
These regulations restrict the hours that fireworks can be supplied to and used by
the general public, and limit the quantity of fireworks that can be supplied to a
purchaser at any one time. 
4.2 These Regulations were in force in time for the 2021 fireworks season.
Enforcement duties were placed upon Police Scotland and Local Authorities. The
Scottish Government provided funding for a programme of advice visits and test
purchases at retailers. The Council’s Trading Standards team (TS) visited all
registered fireworks premises in Argyll & Bute, to both provide advice and to
determine compliance. This proactive approach assisted in ensuring widespread
compliance with the new requirements across Argyll & Bute, and more generally
across Scotland.
4.3 The Fireworks and Pyrotechnic Articles (Scotland) Act 2022 (the Act) was brought
into effect in stages. The first stage related to definitions of fireworks, to redefining
ages at which fireworks could be purchased and by introducing a proxy
purchasing offence. Again, enforcement duties were placed upon Police Scotland
and Local Authorities.
4.4 The second stage came into force on 22nd June 2023 and is more wide-ranging
than stage 1, as it introduces the concept of FCZs. 
Firework Control Zones
4.5 The Act enables a local authority to designate a place within its area as a Firework
Control Zone. The place designated under this section may typically be a small
identifiable place within the local authority area. While it is a matter for local
judgement, it is not expected that a local authority could designate the whole local
authority area as a Firework Control Zone. It is an offence to ignite a firework
within a Firework Control Zone, or knowingly or recklessly throw or cast a lit
firework, or fire a firework, into the zone. Previously, the Explosives Act 1875
made it an offence to light or to throw a firework in or into a public place. A FCZ
will extend this prohibition into private land (including domestic gardens).
However, even if a FCZ is established, it will not completely ban fireworks within
the zone, as there is an exemption from FCZ requirements for public fireworks
displays on behalf of charitable, religious, youth, recreational, community, political
or other similar organisations.
4.6 There is a duty on local authorities to prepare and publish key details of any
proposal for the designation of a Firework Control Zone, or any proposal to amend
or revoke any such zone. Each proposal must set out the reasons behind what is
proposed, the boundaries of the zone, the date from which it is to have effect, how
long it is to have effect and details of the consultation that the authority is to
conduct. The local authority is then required to consult persons who are likely to
be affected by or have an interest in the proposed Firework Control Zone. This is
Page 205

Page 206

not limited to just residents and businesses located within the proposed Firework
Control Zone, but also other members of the community in or near the proposed
Firework Control Zone as well as organisations that would be affected by firework
activity such as Police Scotland, the Scottish Fire and Rescue Service and the
Scottish Ambulance Service. A local authority to publish a decision on a proposal
for a Firework Control Zone (or its amendment or revocation) as soon as
practicable after the decision is made, and at least 60 days before the proposal is
to have effect, in order to give the local community sufficient notice of the
designation.
4.7 The Scottish Government has established a limited pot of funding to allow local
authorities to establish FCZ’s. This is available on a first come first served basis,
and will be a one-off payment. The guidance relating to this payment also states
that local authorities should only express intent to establish FCZ’s where there is
confidence that they can facilitate a the process of community engagement in the
terms set out in the statutory guidance. 
4.8    There are a number of public displays in Argyll and Bute which are, for the most
part, well organised and enjoyed by many. It is unlikely that a FCZ would affect
these, as these would likely fall under an exemption. There is, currently, no
evidence of significant numbers of complaints in relation to public order matters
relating to fireworks and their use in Argyll and Bute and in the event that such
complaints do arise these can likely be dealt with by use of powers already
available to Police Scotland under the 1875 Explosives Act’.
Community Requests for a FCZ            
4.9    Guidance from the Scottish Government provides that there should be a
mechanism whereby a “community request” can be made to the council.           
Local authorities should, where possible, establish a local process to give
communities the ability to make the case for the designation of a Firework Control
Zone, through a "community request".           
The purpose of a community request is to provide communities themselves with
a route to ask a local authority to formally consider whether a zone should be
designated, amended or revoked in a particular place within its area. The Act does
not make provision about community requests, however they can be a valuable
tool for a local authority to become aware of local concerns about fireworks use.           
It is expected that he Council will provide
 Published and accessible details of how to submit a community request, including
advising of the format in which community requests should be made;
 Clearly communicated timings involved with submitting a community request,
including the overall timing of a FCZ being fully considered and consulted on to
manage expectations;
 Who to contact within the local authority to make the request; and
Page 206

Page 207

 Where a request is made, an acknowledgement email to be sent within five
working days wherever possible, although this may vary due to local
circumstances.
4.10    Officers will consider an appropriate portal with supporting information to address
Community Requests in the expectation that this will be led by the Council’s Anti-
Social behaviour Co-Ordinator who, in processing any request, will likely liaise
across appropriate Council Services such as Legal, Trading Standards; the blue
light Services; and relevant communities and community interests.
Further Provisions
4.11     Two further provisions of the 2022 Act are still to be brought into force. The
Scottish Government intend to bring a licensing scheme for purchasers of
fireworks into effect in 2024. This will result in further duties being placed upon
both Police Scotland & upon the Local Weights & Measures Authority. Some one-
off funding may be available to Trading Standards for trader education and test
purchasing initiatives
4.12 Finally, “all year round” fireworks licences will be discontinued on a date to be
determined. Fireworks will only be available for general sale at specific times of
the year. This is unlikely to have any effect in Argyll & Bute, as we currently have
no retailers of this type, and are unlikely to receive any new applications, as
withdrawal of these licences may be imminent  
5.0 CONCLUSION
5.1 While the Act enables a local authority to designate a place within its area as a
FCZ , there are a number of public displays in Argyll and Bute which are, for the
most part, well organised and enjoyed by many. It is unlikely that a FCZ would
affect these, as these would likely fall under an exemption. There is, currently, no
evidence of significant numbers of complaints in relation to public order matters
relating to fireworks and their use in Argyll and Bute and in the event that such
complaints do arise these can likely be dealt with by use of powers already
available to Police Scotland under the 1875 Explosives Act’. Officers will consider
an appropriate portal with supporting information to address Community
Requests in the expectation that this will be led by the Council’s Anti-Social
behaviour Co-Ordinator. 
6.0 IMPLICATIONS
6.1 Policy – None
6.2 Financial – There should be minimal costs which can be covered through existing
budgets.    
6.3 Legal – The proposals in this report are in line with the legislation. 
Page 207

Page 208

6.4 HR – Will be covered through existing officer resource.
6.5 Fairer Scotland Duty - None 
6.5.1 Equalities - protected characteristics – None 
6.5.2 Socio-Economic Duty - None  
6.5.3 Islands - None  
6.6 Climate Change - None   
6.7 Risk – None 
6.8 Customer Service – takes forward the new legislation and gives the option for
residents to send in community requests for FCZs.
Douglas Hendry - Executive Director with responsibility for Legal and              
Regulatory Support
Policy Lead: Councillor Kieron Green
18th August 2023 
For further information contact David Logan - Head of Legal and Regulatory
Support                                                
Page 208

Page 209

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE          
SERVICES AND LICENSING
COMMITTEE 
LEGAL AND REGULATORY
SUPPORT  20th September 2023
CIVIC GOVERNMENT (SCOTLAND) ACT 1982
TAXI FARE SCALE REVIEW 
1.0 EXECUTIVE SUMMARY             
1.1 In terms of Section 17 of the Civic Government (Scotland) Act 1982, the
Local Authority requires to fix maximum fares and other charges in
connection with the hire of taxis operating in their area and to review the
scales for taxi fares and other charges on a regular basis.  Members are
advised that the review has now been concluded and the fares fixed with
effect from 22 October 2023. 
2.0  RECOMMENDATION 
2.1 The Committee is asked to note the above and that a further review of the
taxi fares will take place within 18 months of 22nd October 2023 as
required in terms of section 17 of the Act. 
Page 209 Agenda Item 13

Page 210

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE          
SERVICES AND LICENSING
COMMITTEE 
LEGAL AND REGULATORY
SUPPORT  20th September 2023
CIVIC GOVERNMENT (SCOTLAND) ACT 1982
TAXI FARE SCALE REVIEW 
1.0 INTRODUCTION 
1.1 In terms of Section 17 of the Civic Government (Scotland) Act 1982, the
Local Authority requires to fix maximum fares and other charges in
connection with the hire of taxis operating in their area and to review the
scales for taxi fares and other charges on a regular basis.  Members are
advised that the review has now been concluded and the fares fixed with
effect from 22nd October 2023. 
2.0  RECOMMENDATION 
2.1 The Committee is asked to note the above and that a further review of the
taxi fares will take place within 18 months of 22nd October 2023 as
required in terms of section 17 of the Act. 
3.0 DETAIL 
3.1 In terms of Section 17 of the Civic Government (Scotland) Act 1982, the
Local Authority requires to fix maximum fares and other charges in
connection with the hire of taxis operating in their area and to review the
scales for taxi fares and other charges on a regular basis.  Members
agreed to commence with the review process on 19th April 2023.  At their
meeting on 21st June 2023 the Committee agreed:  
1. To propose that there be no change to the existing scales and that this 
take effect from 22nd October 2023;  
2. To authorise the Head of Legal and Regulatory Support to advertise  
this proposal and to invite any responses within one month of the
advertisement and report back to Members at their meeting on 20th
September 2023; and   
3.    Should no objections or representations be received in relation to the                  
proposal, to delegate to the Head of Legal and Regulatory Support, in                
consultation with the Chair of the PPSL Committee to conclude the 
review without the requirement for the Committee to consider a further 
report on the review. 
3.2 Following the Committee’s decision on 21st June 2023 adverts were
placed in local newspapers week commencing 3rd July 2023 proposing
that there be no changes to the existing fares.   In terms of this any
representations had to be made by 7th August 2023.
Page 210

Page 211

3.3 As no representations were received by that date the Head of Legal and
Regulatory Support in consultation with the Chair of PPSL agreed that no
changes to the fares take place.   
3.4 All operators were notified by letter on 9th August 2023 of the decision and
were provided with a new tariff card.  They were advised they had 14 days
to appeal against the scales to the Traffic Commissioner for Scotland.   
3.5     The Traffic Commissioner for Scotland were contacted and confirmed on 
24th August 2023 that no appeal had been received. 
3.6   Adverts were placed week commencing 28th August 2023 in the local
press confirming that no change to the existing scales and that this takes
effect on 22nd October 2023 as required in terms of section 18A of the Act. 
4.0 CONCLUSION 
4.1      The review of the taxi fares has now been completed. The next review will               
require to be concluded within 18 months of 22nd October 2023 in terms of             
section 18 of the Act. 
5.0 IMPLICATIONS 
5.1 Policy- None  
5.2 Financial -none
5.3  Legal – The Council require to review taxi fares in terms of the Civic                 
Government (Scotland) Act 1982
5.4  HR -none
5.5  Fairer Scotland Duty:-none 
5.5.1   Equalities - protected characteristics-none 
5.5.2   Socio-economic Duty-none 
5.5.3  Islands -none
5.6 Climate Change-none 
5.7 Risk-none
5.8  Customer Service-none 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
Policy Lead: Cllr Kieron Green 
For further information contact:  Sheila MacFadyen, Senior Solicitor
Tel: 01546 604265              Email Sheila.macfadyen@argyll-bute.gov.uk                                                             
Page 211

Page 212