Page 1

REPORT 
Item No: 5 
SUBJECT:  Risk Management: IJB Risk Register 
TO:  IJB Performance, Finance and Audit Committee
Lead
Officer for
Report: 
Ross McGuffie, Chief Officer NHSCP 
Author(s)
of Report 
Stacey Anderson, Support Services / Project Manager
DATE:  21st June 2023 
1. PURPOSE OF REPORT
This paper is coming to the  IJB Performance, Finance and Audit Sub-
Committee: 
For approval  For endorsement  To note 
The purpose of this report is to provide a summary to the Integration Joint
Board on risk management activity, noting any amendments or additions to
the current risk register. 
2. ROUTE TO THE IJB Performance, Finance and Audit Committee 
This paper has been: 
Prepared   Reviewed   Endorsed 
By: The Operational & Business Manager and Chief Officer for H& SC NL. 
3. RECOMMENDATIONS 
3.1 The IJB PFA is asked to note the contents of the report which includes the
latest version of the IJB risk register and a note of those operational risks
highlighted by the Heath & Social Care North Lanarkshire partnership that
impact upon delivery of IJB business. 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES 
5.1  From a good practice and sound governance perspective, all public bodies
are required to identify and take account of the impact of any potential risks in
delivering their business. 
Yes  No  N/A 
1

Page 2

BACKGROUND/SUMMARY OF KEY ISSUES (CONT.) 
5.2  The PFA Committee has delegated oversight and responsibility for financial
and performance risks associated with the remit of the Integration Joint Board
and the PFA committee considered the finance and performance risks at its
last minute on 19th April 2023. The register was also reviewed at the IJB on
17th May 2023. 
5.3 A full review of the risk management reporting within the IJB is currently in
progress as part of the risk strategy review and in line with the dynamic
developments and changes the new NHS Lanarkshire Risk Manager is
implementing within the board. These developments will include review of how
risk reporting is managed and presented at IJB and a further evaluation of the
improvement methodology aligned with the risk actions. In order to provide a
robust overview of these developments, a risk management session has been
scheduled for the next IJB Liaison Session and a full report of changes/
developments will be provided to the IJB PFA and IJB at the next meeting.   
5.4 Following discussions at the last meeting of PFA on 19th April 2023, the risk
register has been updated and additional controls/actions added to:
 IJB 01/21 – Financial Challenges
 IJB 04/21 – Set Aside
 IJB 06/21 – Prescribing
 IJB 11/21 – Performance
 IJB 13/21 – Care Homes
 IJB 14/22 – CAMHS
 IJB 17/22 – Unscheduled Care  
5.5  There are currently two risks rated as Very High on the IJB risk register.
 IJB 06/21 – Prescribing Activity and Costs 
 IJB 17/22 – Unscheduled Care 
5.6  There are eight high rated risks on the IJB risk register.
 IJB 01/21 - Financial Challenges 
 IJB 04/21 - Notional Set Aside Budget 
 IJB 12/21 - Staff Health & wellbeing 
 IJB 14/22 – CAMHS
 IJB 15/22 – Cost of Living
 IJB 16/22 – National Care Service
 IJB 19/23 – Service sustainability
 IJB 20/23 – Workforce sustainability 
5.7 There are a number of high/very high rated operational risks that have been
identified as having or potentially having an impact on IJB objectives and/or
delivery of services and these are highlighted below. 
No Risk  Risk
Rating 
Lead
Organisation/Area
1882 Acute Sector Bed Capacity -
availability of acute beds due to
delays experienced for onwards
Very
High 
NHSL Corporate 
2

Page 3

movement of patients 'fit for
transfer' to care homes, those
requiring care at home,
exacerbated by rising cases of
Covid and high demand
2085  Capacity within NHSL to respond
to ongoing challenges due to
Covid 19 and associated variants
Very
High 
NHSL Corporate 
1379 Delayed Discharge Performance
and Impact
High  NHSL Corporate 
1984 Impact From Stepping Down
Non-Urgent Services
High  NHSL Corporate 
1832  Compliance with the Health &
Care (Staffing) (Scotland) Bill:
Clinical Workforce due to issues
of availability, recruitment and
retention. 
High  NHSL Corporate 
1710  Public Protection: There is a risk
that NHSL could fail to identify
harm to any vulnerable person,
child or adult, or prevent harm to
others resulting from the
complexities of opportunity lost
due to the current reprioritising of
services in response to COVID-
19. 
High  NHSL Corporate 
659 Failure to deal effectively with
major emergency
Very
High 
NHSL Corporate 
2039  Staff Fatigue, Resilience,
Wellbeing & Safety – Effects of
prolonged Covid response is
adversely impacting  on staff,
increasing  staff absence and
consequently reducing 
workforce capacity.
Very
High 
NHSL Corporate 
1992  Continuous Covid Response &
impact on routine PH Screening
& surveillance programmes 
High NHSL Corporate 
1587  Sustainability of the two-site
model for the Out-of-Hours
Service
Very
High 
NHSL Corporate 
2004  Potential Impact on patients
resulting from disruption of day to
day clinical care in response to
Covid pandemic 
Very
High 
NHSL Corporate 
1989   Ability to maintain a workforce
commensurate with the need to
suppress Covid, deliver
Vaccination  Programme,
Recover & Remobilise 
Very
High 
NHSL Corporate 
2014  Recovery of Performance
2021/22
Very
High 
NHSL Corporate 
3

Page 4

2086  Sustaining GP Services  Very
High 
NHSL Corporate 
NLC
RIA0000446
Unable to deliver services due to
funding issues 
Very
High 
NLC  - Social
Care/Social Work 
NLC
RIA0000448 
Availability of workforce to deliver
services within legislative and
regulatory compliance
requirements.
High  NLC – Social
Care/Social Work 
NLC
RIA0000449
Information & Data Protection –
non-compliance with information
governance legislation,
standards and processes and
data security and inability to
retrieve relevant data with
deadlines 
High  NLC – Social
Care/Social Work 
NLC
RIA0000450
Health & Safety of staff in SW &
partnership companies – failure
to ensure the health safety and
welfare at work of the service,
employees, partners and 
provider agencies 
High  NLC – Social
Care/Social Work
NLC
RIA0000453
Supplier failure or services not
provided to required standard.
Insufficient number of providers. 
High  NLC – Social
Care/Social Work
NLC
RIA0000457
Inadequate supervision,
governance and monitoring
across professional workforce 
High  NLC – Social
Work/Social care
NLC
RIA0000458 
IT system not fit for purpose  High  NLC – Social
Work/Social care
NLC
RIA0000459
Integration – there is a risk that
services and not integrated
effectively thus impacting on
improving the outcomes for
individuals receiving care and
support 
High  NLC – Social
Work/Social care
NLC
RIA0000460
Performance & planning –
increasing expectations and
changing performance demands
will result in a failure to provide
performance information internal,
external and including S Govt, 
High  NLC – Social
Work/Social care
NLC
RIS0000414
Community alarm and assistive
technology – unable to continue
to support people with a
community alarm system and
develop use of assistive
technology 
Very
High 
NLC – Social
Work/Social care
NLC
RIS0000415
Mental Health Officers – Failure
to comply with legal obligations 
High  NLC – Social
Work/Social care
NLC
RIS0000417 
Communications strategies and
engagement plans – Inadequate
strategies not aligned with
strategic objectives  
High  NLC – Social
Work/Social care
4

Page 5

NLC RIS000419 Non- compliance with
Information Governance & Data
Protection 
High  NLC – Social
Work/Social care
NLC RIS000426 Analogue to digital transition &
ability to provide a working
community alarm service 
High NLC – Social
Work/Social care 
6. CONCLUSIONS 
6.1 The IJB currently has 17 risks identified on its IJB risk register with 10 risks
rated as high or very high. 
6.2 Risks identified by H&SC NL as potentially impacting on IJB business are
highlighted in the report. 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES  
N/A 
7.2 ASSOCIATED MEASURE(S) 
N/A 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes   No  N/A 
Financial risks are identified in the risk register. 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
This report sets out the IJB risk register and risk assurance process for the
IJB 
7.5  PEOPLE 
N/A 
7.6  STAKEHOLDER ENGAGEMENT 
Stakeholders are represented at the IJB and the IJB PFA Committee and can
contribute to approval and amendments to the IJB risk register. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed: 
Yes  No  N/A 
8. BACKGROUND PAPER 
None 
5

Page 6

9. APPENDICES 
IJB Risk Register   Appendix 1  
IJB Risk Register Overview  Appendix 2 
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact
Stacey Anderson on telephone number 07976801913.
6

Page 7

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB02.
21
Financial
Reputational
01/04/2021
Ineffective Governance Arrangements
There is a risk that the IJB is unable to prevent and detect fraud and corruption within services because of 
inadequate governance arrangements and inadequate internal control systems which could lead to financial and 
reputational damage.
LOW CONTROLS
1. Fraud awareness e‐learning.
2. National Fraud initiative.
3. Locality/SW Enablement Groups.
4. Segregation of duties in relation to authorising and processing direct payments.
5  Whistle blowing policies.
6. Procurement processes and standing orders.
7. Oversight via NLC Audit and Scrutiny Panel and NHSL Audit Committee.
8.  Effective governance arrangements are in place and subject to internal and external audit review.
9.  IJB and IJB PFA meetings established ensuring effective oversight of financial performance.
10. The IJB does not maintain its own policies relating to the prevention and 
detection of fraud and error but instead depends on those in place at its partner 
bodies. . The IJB has a Code of Conduct in place to which members subscribe and the Members’ 
Registers of Interests are publicly available on the IJB’s website.
ACTIONS
1. Continue to raise fraud awareness through team briefings.
2.   Annual planned Procurement and Standing Financial Instructions presentations.                                                                                      
3. Annual review of Code of Conduct                                                                                                                                                                          
4. Review of how Members' Decleration of Interests are collated and reviewed.
5. IJB to request Fraud prevention and detection reports from both partners for oversight at the IJB PFA.                                                 
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.03.24
Previously IJB6.
Reviewed and 
updated on  
March 2023. 
IJB.01/
21
Financial
Strategic
01/04/2021
Financial Challenges
There are a range of financial challenges which will impact on the IJB's ability to deliver the Strategic 
Commissioning Plan intentions within the financial envelope available.  These include:
1.  The absence of a unique IJB financial settlement from the Scottish Government.
2.  The IJB is dependent on funding from both partners.
3.  Late Scottish Government financial settlement.
4.  Budget reductions due to insufficient Scottish Government financial settlements and/or partner contributions.
5.  New Scottish Government policy commitments e.g. Carers (Scotland) Act 2016.
6.  Demographic growth.
7.  Competing service priorities.
8.  Conflicting partner efficiency savings programmes which adversely impact on the HSCP's ability to deliver 
services.
9.  In‐year cost pressures emerging due to the underachievement of planned savings, pandemics and other 
emerging risks which may lead to an overspend.
10.  Each partner may be unable to maintain their financial contributions to the IJB in future years which would 
impact on frontline health and social care services. 
11. The agreed transformational plans and service redesigns are not implemented in full and in line with the 
original implementation plan and/or do not secure the intended improvement outcomes in both performance 
standards and financial efficiency targets.
12.  Future savings targets will continue to be challenging and are likely to impact on essential core services.
13.  The IJB Financial Plan cannot be adhered to and budget recovery plans fail to achieve financial balance for 
both partners.
14. The impact of the pandemic on the financial sustainability of external providers in particular social care 
providers.
15.  The financial implications of the impact of the pandemic on the workforce e.g. increase in sickness absence, 
early retirement requests and recruitment challenges.
The above factors would lead to a failure to achieve the desired strategic aims and would also impact on service 
delivery.
CONTROLS
1.     IJB PFA Committee.
2.     IJB Chief Officer is a member of each partner's key decision‐making forums.
3.     Effective joint working between Chief Financial Officer and both Council and NHS Finance Departments.
4.     Regular budget meetings with Chief Executives and Directors of Finance.
5.     Regular HSCP budget monitoring meetings across Senior Leadership Team.
6.     The IJB Financial Plan 2023/2024 has been agreed and is being reviewed regularly.
7.     IJB medium term financial plan 2023‐25 and reserves strategy 2023‐24 approved at March 23 IJB
8.     Capacity plans in place  to maximise efficiency.
9.     IJB Integration Scheme setting out the budget recovery processes.
10.   IJB Financial Regulations and financial procedures.
11.   Consultation and involvement with key stakeholders including service users and carers.
12.   Prescribing Quality and Efficiency Programme, SWEG, ARG and Home Support monitoring groups are in place.
13.   Joint Strategic Needs Assessment and ongoing move towards preventative and anticipatory approaches.
13.   Strategic Planning Group, Locality engagement sessions and Partnership Boards.
14.   Effective and ongoing service user engagement, staff consultation and Trade Union liaison at strategic and local levels.
15.   Financial sustainability payment arrangements in place to 31 March 2023 to support external social care providers.
16.  The Scottish Government announced on 5 October 2021 an additional £300m for winter health and social care pressures.  
18.  Work is ongoing with both partner organisations to confirm the final 2023/24 budget. Once complete, a new risk will be created to reflect the 
final 2023/24 financial plan. 
ACTIONS
1.    Annual budget setting processes within each of the partners.
2.    HSCP participating in NHSL Sustainability and Value process
3.    Partnership will also be connected to new national whole system groups around budget
Previously IJB2, 
IJB7, IJB10 and 
IJB12.
Reviewed and 
Updated May 
2023. 
HIGH
M
EDIUM
M
arie M
oy
M
arie M
oy
SLT, IJB PFA, IJB
31.05.23
HIGH
Report Prepared by Stacey Anderson on behalf of the Chief Officer
7

Page 8

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB04.
21
Financial
Strategic
01/04/2021
Notional Set‐Aside Budget
There is a risk that resources will not be transferred from Acute Services to the HSCP in line with the shift in the 
balance of care from residential and acute settings to community based alternatives as expected in terms of the 
notional set‐aside concept.  This includes the ongoing development of locality pathways to support maintaining 
people at home e.g. transitional care models.
VERY HIGH
CONTROLS 
1.There is complete transparency and ongoing dialogue between the IJB and the Health Board on the challenges associated with the 
implementation of the notional set‐aside concept.
2.  Bed modelling and capacity planning arrangements are in place. 
3. Effective working relationships between both partners and the IJB have been established. 
4.  Since the inception of the IJB, an agreement is in place whereby the NHSL Health Board will manage the overspend or underspend across the 
notional set‐aside budget.  This arrangement continues to be in place for 2022/23
ACTIONS 
1.The Chief Officer and the Chief Financial Officer continue to raise this concern at a national level.
2. Discussions ongoing with NHSL Director of Finance around unscheduled care spend in 2023/24 and potential carry forward from 22/23 budget
HIGH
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.05.23
Reviewed and 
Updated May 
2023. 
IJB05.
21
Financial
Strategic
01/04/2021
Hosted Services
There is a risk of dispute between the North Lanarkshire IJB and the South Lanarkshire IJB in respect of the 
financial allocations underpinning the Hosted Services particularly as a result of the budget changes linked to the 
implementation of devolved locality models.  This could impact on the ability of each IJB to achieve its 
commissioning intentions and may also have an adverse impact on service users across Lanarkshire.
VERY HIGH
CONTROLS 
 
1. North and South IJBs aim to co‐operate to ensure a pan‐Lanarkshire approach is achieved across all hosted services.
2.  Financial and budgetary controls.
3.  Performance reports on service delivery.
4.  The Hosted Services principles in respect of the management of the overspends and underspends are agreed for each financial year.
M
EDIUM
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.06.23
IJB06.
21
Financial 
Operational
01/04/2021
Prescribing Activity and Costs
The cost of prescribing is growing due to issues in supply chains driving increased wholesaler cost of medicines, 
advance treatment developments resulting in the need for more expensive medications, aging population and 
increase in patients requiring regular medication. Medication availability has been impacted following the EU 
withdrawal the UK 's membership of the common regulatory bodies and EU agencies, such as the European 
Medicines Agency, (EMA), European Centre for Disease Prevention and Control and the European Atomic Energy 
Community. The risk is that this could impact on the availability of medicines, healthcare techniques and 
technology and in respect of the supply of medicines and medical devices, additional checks are now required at 
ports in the UK and the EEA before goods, including medical products, can cross the border.  New customs checks 
are required when moving medicines between the EEA and the UK.
M
edium 
CONTROLS
1.. Prescribing Quality and Efficiency Programme.
2.  Prescribing Management Board functions and membership.
3. Deputy Lead Pharmacist supporting HSCP Senior Leadership Team.
4. Locality Pharmacist input.
5. Earmarked reserve established to address prescribing costs.
6. Regular HSCP monitoring. 
In respect of the regulation of medicines and medical devices, the Medicines and Healthcare products Regulatory Agency (MHRA) became the 
UK’s sovereign regulator.
7. The new trade deal contains specific clauses that mean both the UK and EEA states formally recognise each other’s good practice in medicine 
manufacturing.
8. To reduce the risk of divergence from the EU rules, there are three interrelated factors; the technical annexes of the new trade deal, the 
Northern Ireland protocol and the UK Internal Market Act.
9. The effectiveness of the Border Operating Model to import and export goods to and from the EEA, which was being implemented in  stages 
from 2020 to minimise any risk of disruption, is still being assessed.  The risk of border delays is still evident.  Other measures were also 
implemented specifically to mitigate the risk of supplies of medicines and medical devices being disrupted.  In August 2020 the UK government 
instructed medicine suppliers to maintain a stockpile equivalent to six weeks’ supply though the first three months of 2021.  In addition, the 
Department of Transport has secured additional freight capacity to bring medicines into the country via other routes.
ACTIONS
1. Review of Locality Prescribing Action Groups.
2. Prescribing part of NHSL Sustainability and Value structures
3. Continuation of Scriptswitch.
VERY HIGH
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.06.23
Previously IJB11.
IJB07.
21
Financial
Strategic
01/04/2021
Third and Voluntary Sector
There is a risk that Third Sector organisations in North Lanarkshire are vulnerable because of the lack of certainty 
in respect of long‐term funding security.  This uncertainty has the potential to lead to service instability, 
recruitment and retention challenges and an increasing reliance on statutory services. 
HIGH CONTROLS
1.  Third Sector Interface represented on key strategic groups.
2.  Community capacity building and carer support infrastructure embedded across North Lanarkshire.
3.  Community capacity building is regularly reviewed.
4.  Maximising funding opportunities for the third and voluntary sector will continue to be progressed.
ACTIONS
 
 
1.The annual HSCP funding which is directed to the third sector is recurring funding.  Funding will be confirmed each year in line with the 
agreement of the IJB Financial Plan and subject to the Scottish Government financial settlements for future years.
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.23
Previously IJB16.
Report Prepared by Stacey Anderson on behalf of the Chief Officer
8

Page 9

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.10.
21
Financial
Strategic
01/04/2021
Ineffective Governance Arrangements Due To the Covid‐19 Pandemic
1.   There is a risk that the intensity of the required response to Covid‐19 could result in a failure of governance 
impacting on the effectiveness of the IJB decision‐making, IJB directions to partners and IJB oversight of 
operational service delivery.  Routine governance processes could be overwhelmed. 
2.   New or amended Covid‐19 legislation and Scottish and UK Government guidance may not be adopted 
effectively and timeously.
3.   There is no / limited public access to IJB and PFA meetings during the period of the pandemic, in line with 
Public Health advice.
4.   Ineffective information governance controls could lead to data breaches and an impact on the General Data 
Protection Regulations.
5.   Communications with employees, patients and service users may be ineffective.
6.   There will require to be changes to the working environment including remote working and working from 
home.
7.  There is a reduced ability to protect the wellbeing of employees, patients and service users.
8.   There may be adverse media coverage locally, a loss of public confidence and reputational damage.
M
EDIUM
CONTROLS
1. National Networks are established which are providing the framework to support a national approach where appropriate.
2.  Public Health advice and support is in place. 
3.  Increased numbers of agile workers and increased number of laptops/tablets.
4.  Continued working from home arrangements supported by the roll out of MS Teams / Zooms.  Regular updates on the guidance for the use of 
MS Teams / Zoom Meetings is circulated.  A blended approach to home/work‐based working is being developed going forward.
5.  Risk registers are in place for the IJB and each partner.  Each partner has a specific HSCP Covid‐19 Risk Register in place.
6.  The IJB and both partners aim to comply with the European Working Time Directive (WTD) and minimise the risk of all staff working beyond 48 
hours per week, in particular front‐line service delivery.  As a result of the withdrawal from the European Union, the WTD ceased to apply to the 
United Kingdom at the end of the transition period (31 December 2020).  However, the UK's Working Time Regulations which implement the EU 
Working Time Directive will continue to apply unless and until amended by UK law.
ACTIONS 
1.  Staff health and well being is a key priority for both partners and all key stakeholders.  The commitment to staff health and well being is being 
actively promoted through all available forums.
M
EDIUM
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.06.23
IJB.11
21 
Performance  30/07/2021
Oversight of Performance Activity                                                                                                                                               
There is a risk that the  IJB is not provided with adequate or sufficient performance information to enable it to 
discharge its scrutiny and oversight role; make informed decisions and recommend remedial actions to address 
any performance concerns. 
LOW CONTROLS
1. Regular (quarterly) reports on the IJB performance framework, providing updates on areas for improvement, remedial actions (and timescales) 
and updates on performance issues previously reported.
2. Chief Executive Performance Review arrangements.
3. Hosted Services Performance Review arrangements.
4. Sector/Locality Performance Review arrangements.
ACTIONS
1. Request detailed topic based performance reports on specific areas of concern  e.g. CAMHS & Psychological Therapies.
2. Face to face Q3 performance reviews taking place throughout May 23 with sectors/units
low  LOW
Ross M
cGuffie
M
orag Dendy 
SLT, IJB PFA, IJB
31.12.23
IJB.12.
21 
Performance  30/08/2021
Staff Health & Wellbeing
There is a risk to the delivery of the Strategic Commissioning Plan as a result of sustained pressures on staff 
availability due to additional pressures associated with  Covid 19, current sickness abscence levels and potential 
for further staff redeployment due to winter planning contingency arrangements.                                                   
medium 
Controls
1. Strategic Staff Health & Wellbeing Committee  established reporting to NLC & NHSL corporate management teams.
2. Range of support services available both nationally and locally e.g Occupational Health, Spiritual care, Psychological Services, national 
wellbeing hub (www.PRoMIS.scot.uk).                                                                                                                                                                                                  
3. Rest & Recuperation areas identified.                                                                                                                                                                                               
4. Peer Support Networks established                                                                                                                                                                                                   
5. Well established Occupational Health supports available to support staff sickness.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Actions
1. Short Life Working Group for wellbeing with targeted approach for immediate actions including Staff Health & Wellbeing Champions, access to 
online supports, access to Occupational Health Services, helpline established and dedicated resource identified for wellbeing officers to be 
recruited.
2. Funding recieved by Scottish Government specificaly targeting staff well being programmes and supports. Local plans for use of funding being 
developed.                                                                                                                                                                                                                                                   
3. Managers supporting & encouraging staff to take planned leave/use full leave allocation
4. Audits of adherence to sickness absence policy being undertaken
HIGH 
low  Ross M
cGuffie
Ross M
cGuffie 
SLT, IJB PFA, IJB, SC&CG, AH&SC 
31.05.23
Reviewed and 
Updated May 
2023 
IJB.13.
2021 
Performance  30.08.21 
Care Homes                                                                                                                                                                       
Inability of care homes to sustain service due to staffing or Covid outbreaks resulting in closure to new 
placements. This may increase delayed discharge numbers putting additional pressure on acute site capacity and 
impacting on recovery.
The financial support for social care providers during the Covid‐19 pandemic is being reviewed.  Payments in 
respect of under‐occupancy in care homes were extended to 31 October 2021.                                                                
High  Controls                                                                                                                                                                                                                                                       
1. Establishment of Care Home Assurance Team.
2. Escalation Process in place.
3. National protocol to support discharge of Covid 19 patients in place.
Actions 
1.  Public Health teams providing guidance on infection control.
2. Care Home assurance team undertaking support visits to all care homes & action plans in place for each care home.
3. Staff and visitor testing in place.
4. All care homes advised to use PPE in line with national  addendum.
5. Development day on 12th May 23 to agree structures and approach for year ahead
medium
medium 
Ross M
cGuffie
Trudi M
arshall 
IJB, PF&A, SLT, SC&SC, A H &SC 
31.12.23
Report Prepared by Stacey Anderson on behalf of the Chief Officer
9

Page 10

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.14.
2022
Strategic & 
Performance 
30.04.22
CAMHS ‐                                                                                                                                   There is a risk that the CAMHS 
service cannot meet the increasing clinical demands due to a significantly high number of cumulative staff 
vacancies for both clinical and non‐clinical posts and challenges recruiting to new posts identified through the 
national recovery and renewal fund.  This is impacting on community, in‐ patient and out‐ patient care with the 
potential to adversely affect response time to referrals; longer waiting times; poorer outcomes; delays in redesign
and reputation of the IJB. 
Very High 
Controls ‐                                                                                                                                                                                                         
1. Prioritisation of referrals; all referrals 1vetted daily with urgent referrals prioritised 
2. Commenced programme of work and implementation of a more structured partnership approach through Choices & Partnership Approach 
(CAPA) service model, with tier 1 & 2 referred through 3rd sector and interfacing with North & South Education Departments
3. Secured significant national investment to fully implement new service model
4. Active review of skill mix to utilise medical staff only when required for highly complex patients
5. Vacancy gap analysis with active recruitment commenced.  Expected to have recruited 75% of gap by end of May 2023
6. Continuous review and validation of the waiting list
Action
1. Incremental implementation of the new service model
2. CAPA appointments begin on 1st May 2023
3. Refurbishment of North Lanarkshire facilities commences early summer 2023
High
medium 
Ross M
cGuffie
M
orag Dendy 
IJB,PF&A, SLT 
31.05.23
Reviewed and 
Updated May 
2023. 
IJB.15.
2022
Strategic & 
Performance 
05.09.22
Cost of Living
There is a risk that the IJB's Strategic Commissioning Plan will be unable to be delivered or not have the desired 
impact due to the cost of living rises being faced by residents across North Lanarkshire, leading to a further 
widening of the inequality gap, reduced quality of life and increased health and social care demand due to 
individuals and families having insufficient funds to support basic requirements such as food and heating. 
High CONTROLS
1. NLC Silver command group stood up focused on cost of living
2. NHSL commenced review through CMT
3. Population Health Committee to review activity around cost of living
ACTIONS
1. Survey of NLC hybrid workers to see if home working remains financially viable
2. Business case being developed to expand 'support for people' arrangements used in pandemic to support resident access to welfare rights and 
other supports
3. 3% increase in individual budgets to support service users to maintain current levels of supports at higher cost
4. Recommendation from adult social work, care and wellbeing committee to review all charges to service users and wider cost of living supports 
that could be offered
5. SW Committee approval sought for cost of living contract increases in May 2023
High
M
edium
Ross M
cGuffie
Ross M
cGuffie
SLT, IJB
31.05.23
Reviewed and 
Updated May 
2023. 
IJB.16.
2022
Strategic   05.09.22
National Care Service
There is a risk that the ongoing work around a National Care Service could destabilise current service delivery due 
to significant change activity, time demands around the co‐design process, staff uncertainty and partner 
organisations having to focus inwardly due to the impact of change leading to an impact on the ability to deliver 
the significant ongoing change programmes already approved by the IJB and the Strategic Commissioning Plan for 
2023‐26. 
High CONTROLS 
1. NLC establishing NCS working groups
2. Key HSCP leads involved in national developments
3. Ongoing progress updates to IJB and IJB PFA
ACTIONS
1. IJB response submitted on proposed Bill
2. Strong partnership links into working groups at Chief Officers, Chief Finance Officers and Social Work Scotland groups
High
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
31.05.23
Reviewed and 
Updated May 
2023. 
IJB.17.
2022
Strategic & 
Performance 
05.09.22
Unscheduled Care
There is a risk that we cannot sustain whole system patient flow through peak winter pressures due to increased 
front door demand; hospital workforce capacity; delays in onward movement of patients due to care home 
capacity/outbreaks and care at home capacity; and community health and social care workforce capacity leading 
to reduced ability to meet 'routine'  and increasing bed demand for more unwell patients, deteriorating delayed 
discharge performance and an inability to recover services. 
Very High
CONTROLS
1. Care Home Assurance Group and associated supports for care homes through liaison service, IPC advice and support, risk assessment for 
onward movement of patients etc
2. Care at Home Assurance group and associated activity to try to support and sustain independent sector provision
3. NHS CMT and Covid response group oversight of performance
4. Daily PDD meetings to review every planned supported discharge and delayed discharge
5. Operation Flow now underway to ensure whole system approach to unscheduled care/delayed discharge challenges
ACTIONS
1. Expansion of Home Support service
2. Roll out of Home Assessment Teams across all 6 Localities by Feb
3. New CSW roles in District Nursing teams to proactively support Care Managed patients
4. Additional Nursing capacity in District Nursing Teams
5. Expansion of Equpiment and Adaptation Service to support rapid access in community
6. Expansion of H@H service (hours of provision as well as moving to support discharges as well as admission prevention)
7. Expansion of Integrated Rehabilitation Teams in all six Localities to support rehab in the community and reduce long‐term service demand
8. 5 Task and Finish groups now established to roll out the key actions agreed through the Operation Flow programme (Phase 2 to be completed 
by Sept 23)
Very High
M
edium
Ross M
cGuffie
Ross M
cGuffie
SLT, IJB PFA, IJB 
28.06.23
Report Prepared by Stacey Anderson on behalf of the Chief Officer
10

Page 11

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.18.
2022
Strategic and 
Performance 
05.09.22
Community Alarms
There is a risk that the community alarm system will be destabilised due to the national change from analogue to 
digital telephony by 2025, leading to community alarm users not getting a response when required. 
High CONTROLS
1. Working group established to coordinate all activity
2. Oversight through Home Support Programme Board
3. Reporting to Adult Social Work, Care and Wellbeing Committee
4. Reporting to IJB
ACTIONS
1. NLC Committee approval to purchase 1000 digital alarms so the service can support any imminent changes over to digital in individual areas
2. NLC part of SG once for Scotland procurement process for a new digital alarm receiving centre
3. Communication out to all community alarm service users
4. Instructions issued to all community alarm service users on how to do test calls to ensure alarms are  operational
5. Engagement with telecommunication suppliers to ensure sight of roll out plans across NL
M
edium
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
30.06.23
IJB.19.
2023
Performance 
27/02/2023
Service Sustanability                                                                                                                                                                     
Due to competing service priorties and workforce/ operational and finacial challenges there is a risk that the IJB 
will be unable to implement the strategic plan/commision plan . Failure to achieve the desired strategic aims of 
the IJB poses a risk on operational service delivery and the achievement of financial balance and patient safety 
High
Controls                                                                                                                                                                                                                         
1.     IJB PFA Committee.
2.     IJB Chief Officer is a member of each partner's key decision‐making forums.
3.     Effective joint working between Chief Financial Officer and both Council and NHS Finance Departments.
4.     Regular budget meetings with Chief Executives and Directors of Finance.
5.     Regular HSCP budget monitoring meetings across Senior Leadership Team.
6.     The IJB Financial Plan is regulary reviewed and agreed. 
7.     Capacity plans in place  to maximise efficiency.
8.   Consultation and involvement with key stakeholders including service users and carers.                                                                      
9. Joint Strategic Needs Assessment and ongoing move towards preventative and anticipatory approaches.
10.   Strategic Planning Group, Locality engagement sessions and Partnership Boards.
11.   Effective and ongoing service user engagement, staff consultation and Trade Union liaison at strategic and local levels.
Actions 
1.  Sustainability  plans to be reviewed regulalry 
2. Re‐introduction of scruity panels 
3. Improve linkage across all risk registers (tiers 1 to 3, council and NHS) to help ensure areas of concern are identified and 
reviewed regularly. 
4 Review of reporting process into IJB to ensure contionus review of services/ service developments
High
Low
Ross McGuffie
Ross McGuffie
SLT, IJB PFA, IJB
31.05.23
Reviewed and 
Updated May 
2023 
IJB.20.
2023
Workforce Sustanability                                                                                                                                                                 
It is becoming increasingly difficult to recruit to particular roles across Health and Social Care.   Gaps in the 
workforce can result in reduction of service provsion, increase in staff workload and inability to deliver the 
strategic plan. Following EU withdrawl there is  no longer the free movement of labour between the UK and EEA 
countries.  All workers arriving from the EEA and non‐EEA countries are subject to the same immigration rules.  
The new points‐based immigration system makes exceptions for the majority of health care professionals with an 
NHS job offer and for qualified social workers via a new fast‐track visa route, known as the Health and Care 
Worker Visa. There are however no exceptions made for other social care roles, such as care workers.                       
The Mutual Recognition of Professional Qualifications Directive is an EU‐wide directive that allows professional 
regulators in all member states to automatically recognise professional qualifications.  The UK government has 
decided to continue recognising qualifications gained in the EEA for at least two years after the transition period 
ends.  This however is not a reciprocal and there is no guarantee that qualifications gained in the UK will be 
accepted by professional regulators in EEA nations.
High CONTROLS 
1. All successful Health and Care Worker Visa applicants are exempt from the Immigration Health Surcharge, a one‐off charge levied against 
arriving migrant workers as part of the visa application process.  The system has been designed to make international recruitment into health and 
social care roles more straightforward for employers and employees alike.  These changes to immigration rules are in law as part of the 
Immigration and Social Security Co‐ordination (EU Withdrawal) Act 2020.  As such, from 1 January 2021, they apply to all workers arriving to work 
in the NHS or adult social care.  All workers from EEA nations who are already resident in the UK had until 30 June 2021 to apply for the EU 
Settlement Scheme which will guarantee their right to work in the UK indefinitely.
2. In respect of the mutual recognition of professional qualifications, professional regulatory bodies are working with the UK government to 
review future registration requirements for those with qualifications gained in the EEA and decide what they will be from January 2023.
3. Development of the Care Academy 
4. Dedicated HR support identified in NHSL and NLC to support key priority areas of recruitment such as Mental Health and Home Support
ACTIONS
1. Annual workforce plan being prepared
2. NHSL programme underway to support international recruitment
3. On the day recruitment events being trialled in Home Support
4. Use of university status being explored following positive gains in Podiatry and Psychological Therapies recruitment
High
Medium
Ross McGuffie
Ross McGuffie
SLT, IJB PFA, IJB
31.05.23
Reviewed and 
Updated May 
2023 
Report Prepared by Stacey Anderson on behalf of the Chief Officer
11

Page 12

NORTH LANARKSHIRE IJB RISK REGISTER 
OVERVIEW 
May/June 2023 
Appendix 2
12

Page 13

North Lanarkshire IJB Risks – Dashboard 
Executive Summary 
 Following an agreement of the IJB Risk Strategy at the IJB held in May 2023, a full review of the IJB risk register was undertaken
 Any emerging or new risks are discussed at the IJB PFA and presented for information at IJB
 All risks on the IJB Risk Register are consistently reported to relevant assurance committees to provide oversight and assurance
Highest Scoring Risks  
IJB  Risk   Score   Trend  
IJB 06/21 – Prescribing Activity and 
Costs 
Very High 
Started as Medium Risk (April 2021) 
IJB 17/22 – Unscheduled Care  Very High 
IJB 01/21 ‐ Financial Challenges   High 
IJB 04/21 ‐ Notional Set Aside Budget  High 
Started as Very High Risk (April 2021) 
IJB 12/21 ‐ Staff Health & wellbeing   High 
 
IJB Risk movement since last report 
No Change  Risk Level  
Increase 
Risk Level 
Decrease 
New Risks  Closed Risks   Risks with 
Action 
Updates 
10  0  0  0  0  7 
Risk Registers  Number of 
Risks  
IJB  17 
NL Council  
NHS 
Lanarkshire 
18 
13

Page 14

Started as Medium Risk (Aug 2021) 
IJB 14/22 – CAMHS  High 
Started as Very High Risk (April 2022) 
IJB 15/22 – Cost of Living  High 
IJB 20/23 – Workforce sustainability   High 
IJB 19/23‐ Service Sustainability   High 
IJB 16/22‐ National Care Service   High 
NL Council   Risk   Score   Trend  
NLC RIA0000446‐ Unable to deliver 
services due to funding issues 
Very High 
NLC RIA0000448 ‐Availability of 
workforce to deliver services within 
legislative and regulatory compliance 
requirements. 
High 
NLC RIA0000449‐ Information & Data 
Protection – non‐compliance with 
information governance legislation, 
standards and processes and data 
security and inability to retrieve 
relevant data with deadlines 
High 
NLC RIA0000450‐ Health & Safety of 
staff in SW & partnership companies 
– failure to ensure the health safety
and welfare at work of the service, 
High 
14

Page 15

employees, partners and  provider 
agencies 
NLC RIA0000453‐ Supplier failure or 
services not provided to required 
standard. Insufficient number of 
providers. 
High   
NLC RIA0000457‐ Inadequate 
supervision, governance and 
monitoring across professional 
workforce 
High   
 
 
 
NLC RIA0000458 ‐ IT system not fit 
for purpose 
High   
NLC RIA0000459‐ Integration – there 
is a risk that services and not 
integrated effectively thus impacting 
on improving the outcomes for 
individuals receiving care and 
support 
High   
NLC RIA0000460‐ Performance & 
planning – increasing expectations 
and changing performance demands 
will result in a failure to provide 
performance information internal, 
external and including S Govt, 
High   
NLC RIS0000414‐ Community alarm 
and assistive technology – unable to 
continue to support people with a 
community alarm system and 
develop use of assistive technology 
Very High   
NLC RIS0000415‐ Mental Health 
Officers – Failure to comply with 
legal obligations 
High   
15

Page 16

NLC RIS0000417 ‐ Communications 
strategies and engagement plans – 
Inadequate strategies not aligned 
with strategic objectives   
High   
NLC RIS000419‐ Non‐ compliance 
with Information Governance & Data 
Protection 
High   
NLC RIS000426‐ Analogue to digital 
transition & ability to provide a 
working community alarm service 
High   
NHS Lanarkshire   Risk   Score   Trend  
1882‐ Acute Sector Bed Capacity ‐ 
availability of acute beds due to 
delays experienced for onwards 
movement of patients 'fit for 
transfer' to care homes, those 
requiring care at home, exacerbated 
by rising cases of Covid and high 
demand 
Very High   
2085 ‐ Capacity within NHSL to 
respond to ongoing challenges due 
to Covid 19 and associated variants 
Very High   
1379‐ Delayed Discharge 
Performance and Impact 
High   
1984‐ Impact From Stepping Down 
Non‐Urgent Services 
High   
1710 ‐ Public Protection: There is a 
risk that NHSL could fail to identify 
harm to any vulnerable person, child 
or adult, or prevent harm to others 
resulting from the complexities of 
opportunity lost due to the current 
High   
16

Page 17

reprioritising of services in response 
to COVID‐19. 
659‐ Failure to deal effectively with 
major emergency 
Very High   
2039 ‐ Staff Fatigue, Resilience, 
Wellbeing & Safety – Effects of 
prolonged Covid response is 
adversely impacting  on staff, 
increasing  staff absence and 
consequently reducing  workforce 
capacity. 
Very High   
1992 ‐ Continuous Covid Response & 
impact on routine PH Screening & 
surveillance programmes 
High   
1587 ‐ Sustainability of the two‐site 
model for the Out‐of‐Hours Service 
Very High   
2004 ‐ Potential Impact on patients 
resulting from disruption of day to 
day clinical care in response to Covid 
pandemic 
Very High   
1989 ‐ Ability to maintain a 
workforce commensurate with the 
need to suppress Covid, deliver 
Vaccination  Programme, Recover & 
Remobilise 
Very High   
2014 ‐ Recovery of Performance 
2021/22 
Very High   
2086‐ Sustaining GP Services  Very High   
 
 
 
17

Page 18

Details of IJB Risk Movement/ Update of Actions   
 
Risk (Reference 
and Title) 
Date Risk 
Added to 
Register  
Review 
Date  
Current 
Score 
Trend  Target 
Score  
Commentary   Actions for the 
risk  
IJB.01/21 
Financial 
Strategic 
Financial 
Challenges 
01/04/2021  31.05.23  High    Medium   'CONTROLS 
1.     IJB PFA Committee. 
2.     IJB Chief Officer is a member of each 
partner's key decision‐making forums. 
3.     Effective joint working between Chief 
Financial Officer and both Council and NHS 
Finance Departments. 
4.     Regular budget meetings with Chief 
Executives and Directors of Finance. 
5.     Regular HSCP budget monitoring 
meetings across Senior Leadership Team. 
6.     The IJB Financial Plan 2023/2024 has 
been agreed and is being reviewed regularly. 
7.     IJB medium term financial plan 2023‐25 
and reserves strategy 2023‐24 approved at 
March 23 IJB 
8.     Capacity plans in place to maximise 
efficiency. 
9.     IJB Integration Scheme setting out the 
budget recovery processes. 
10.   IJB Financial Regulations and financial 
procedures. 
11.   Consultation and involvement with key 
stakeholders including service users and 
carers. 
ACTIONS 
1.    Annual budget 
setting processes 
within each of the 
partners takes 
place before the 
start of each 
financial year.  
2.    HSCP 
participating in 
NHSL 
Sustainability and 
Value process 
3.    Partnership 
will also be 
connected to new 
national whole 
system groups 
around budget 
18

Page 19

12.   Prescribing Quality and Efficiency 
Programme, SWEG, ARG and Home Support 
monitoring groups are in place. 
13.   Joint Strategic Needs Assessment and 
ongoing move towards preventative and 
anticipatory approaches. 
13.   Strategic Planning Group, Locality 
engagement sessions and Partnership 
Boards. 
14.   Effective and ongoing service user 
engagement, staff consultation and Trade 
Union liaison at strategic and local levels. 
15.   Financial sustainability payment 
arrangements in place to 31 March 2023 to 
support external social care providers. 
16.  The Scottish Government announced on 
5 October 2021 an additional £300m for 
winter health and social care pressures.   
18.  Work is ongoing with both partner 
organisations to confirm the final 2023/24 
budget. Once complete, a new risk will be 
created to reflect the final 2023/24 financial 
plan.  
 
 
 
IJB04.21Financial
Strategic 
Notional Set‐
Aside Budget 
01/04/2021  31.05.23  High    Medium   CONTROLS  
1.There is complete transparency and 
ongoing dialogue between the IJB and the 
Health Board on the challenges associated 
with the implementation of the notional set‐
aside concept. 
ACTIONS  
1.The Chief Officer 
and the Chief 
Financial Officer 
continue to raise 
this concern at a 
national level. 
19

Page 20

2.  Bed modelling and capacity planning 
arrangements are in place.  
3. Effective working relationships between 
both partners and the IJB have been 
established.  
4.  Since the inception of the IJB, an 
agreement is in place whereby the NHSL 
Health Board will manage the overspend or 
underspend across the notional set‐aside 
budget.  This arrangement continues to be in 
place for 2022/23 
2. Discussions 
ongoing with 
NHSL Director of 
Finance around 
unscheduled care 
spend in 2023/24 
and potential 
carry forward 
from 22/23 
budget 
IJB05.21 
Financial 
Strategic 
Prescribing 
Activity and 
Costs 
01/04/2021  31/06/23  Very High    Low  CONTROLS 
1.. Prescribing Quality and Efficiency 
Programme. 
2.  Prescribing Management Board functions 
and membership. 
3. Deputy Lead Pharmacist supporting HSCP 
Senior Leadership Team. 
4. Locality Pharmacist input. 
5. Earmarked reserve established to address 
prescribing costs. 
6. Regular HSCP monitoring.  
In respect of the regulation of medicines and 
medical devices, the Medicines and 
Healthcare products Regulatory Agency 
(MHRA) became the UK’s sovereign 
regulator. 
7. The new trade deal contains specific 
clauses that mean both the UK and EEA 
states formally recognise each other’s good 
practice in medicine manufacturing. 
8. To reduce the risk of divergence from the 
EU rules, there are three interrelated 
ACTIONS 
1. Review of 
Locality 
Prescribing Action 
Groups. 
2. Prescribing part 
of NHSL 
Sustainability and 
Value structures 
3.Continuation of 
Scriptswitch. 
20

Page 21

factors; the technical annexes of the new 
trade deal, the Northern Ireland protocol 
and the UK Internal Market Act. 
9. The effectiveness of the Border Operating 
Model to import and export goods to and 
from the EEA, which was being implemented 
in stages from 2020 to minimise any risk of 
disruption, is still being assessed.  The risk of 
border delays is still evident.  Other 
measures were also implemented 
specifically to mitigate the risk of supplies of 
medicines and medical devices being 
disrupted.  In August 2020 the UK 
government instructed medicine suppliers to 
maintain a stockpile equivalent to six weeks’ 
supply though the first three months of 
2021.  In addition, the Department of 
Transport has secured additional freight 
capacity to bring medicines into the country 
via other routes. 
 
 
IJB.1121 
Performance  
Staff Health & 
Wellbeing 
30/08/2021  31.05.23  High    Low  Controls 
1. Strategic Staff Health & Wellbeing 
Committee established reporting to NLC & 
NHSL corporate management teams. 
2. Range of support services available both 
nationally and locally e.g. Occupational 
Health, Spiritual care, Psychological Services, 
national wellbeing hub 
(www.PRoMIS.scot.uk).                                         
3. Rest & Recuperation areas identified.            
4. Peer Support Networks established                
Actions 
1. Short Life 
Working Group for 
wellbeing with 
targeted approach 
for immediate 
actions including 
Staff Health & 
Wellbeing 
Champions, access 
to online supports, 
21

Page 22

5. Well established Occupational Health 
supports available to support staff sickness. 
access to 
Occupational 
Health Services, 
helpline 
established and 
dedicated 
resource 
identified for 
wellbeing officers 
to be recruited. 
2. Funding 
received by 
Scottish 
Government 
specifically 
targeting staff 
wellbeing 
programmes and 
supports. Local 
plans for use of 
funding being 
developed.                
3. Managers 
supporting & 
encouraging staff 
to take planned 
leave/use full 
leave allocation 
4. Audits of 
adherence to 
sickness absence 
policy being 
undertaken 
22

Page 23

5. Findings of the
audit to be shared 
with IJB.  
IJB.13.2021 
Performance 
Care Homes 
30.08.21  31.12.23  Medium   Medium   Controls    
1. Establishment of Care Home Assurance
Team. 
2. Escalation Process in place.
3. National protocol to support discharge of
Covid 19 patients in place. 
Actions  
1. Public Health
teams providing 
guidance on 
infection control. 
2. Care Home
assurance team 
undertaking 
support visits to 
all care homes & 
action plans in 
place for each 
care home. 
3. Staff and visitor
testing in place. 
4. All care homes
advised to use PPE 
in line with 
national 
addendum. 
5. Development
day on 12th May 
23 to agree 
structures and 
approach for year 
ahead 
23

Page 24

IJB.14.2022 
Strategic & 
Performance 
CAMHS 
30.04.22  31.05.23  High  Medium  Controls ‐
1. Prioritisation of referrals; all referrals
1vetted daily with urgent referrals prioritised 
2. Commenced programme of work and
implementation of a more structured 
partnership approach through Choices & 
Partnership Approach (CAPA) service model, 
with tier 1 & 2 referred through 3rd sector 
and interfacing with North & South 
Education Departments 
3. Secured significant national investment to
fully implement new service model 
4. Active review of skill mix to utilise medical
staff only when required for highly complex 
patients 
5. Vacancy gap analysis with active
recruitment commenced.  Expected to have 
recruited 75% of gap by end of May 2023 
6. Continuous review and validation of the
waiting list 
Action 
1. Incremental
implementation of 
the new service 
model 
2. CAPA
appointments 
begin on 1st May 
2023 
3. Refurbishment
of North 
Lanarkshire 
facilities 
commences early 
summer 2023 
4. Progress report
will be submitted 
to IJB approx. Nov 
23.  
IJB.17.2022 
Strategic & 
Performance 
Unscheduled 
Care 
05.09.22  28.06.23  Very High  Medium   CONTROLS 
1. Care Home Assurance Group and
associated supports for care homes through 
liaison service, IPC advice and support, risk 
assessment for onward movement of 
patients etc. 
2. Care at Home Assurance group and
associated activity to try to support and 
sustain independent sector provision 
3. NHS CMT and Covid response group
oversight of performance 
ACTIONS 
1. Expansion of
Home Support 
service 
2. Roll out of
Home Assessment 
Teams across all 6 
Localities by Feb 
3. New CSW roles
in District Nursing 
teams to 
proactively 
24

Page 25

4. Daily PDD meetings to review every 
planned supported discharge and delayed 
discharge 
5. Operation Flow now underway to ensure 
whole system approach to unscheduled 
care/delayed discharge challenges 
support Care 
Managed patients 
4. Additional 
Nursing capacity 
in District Nursing 
Teams 
5. Expansion of 
Equipment and 
Adaptation 
Service to support 
rapid access in 
community 
6. Expansion of 
H@H service 
(hours of provision 
as well as moving 
to support 
discharges as well 
as admission 
prevention) 
7. Expansion of 
Integrated 
Rehabilitation 
Teams in all six 
Localities to 
support rehab in 
the community 
and reduce long‐
term service 
demand 
8. 5 Task and 
Finish groups now 
established to roll 
25

Page 26

out the key 
actions agreed 
through the 
Operation Flow 
programme 
(Phase 2 to be 
completed by Sept 
23) 
 
26