1
REPORT
Item No: 10
SUBJECT: Prisoner Healthcare
TO: Performance, Finance & Audit Committee
Lead
Officer for
Report:
Maggs Thomson, Head of Head, North HSCP
Author(s) of
Report
Jim Duffy, General Manager, Adult Health Services Unit, North
HSCP
DATE: 21 June 2023
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
For approval ☐ For endorsement ☐ To note ☒
1.2 This paper sets out an overview of the Prisoner Healthcare service within North
Lanarkshire
2. ROUTE TO THE BOARD
This paper has been:
Prepared By: ☒ Reviewed By: ☒ Endorsed By: ☐
Prepared by J Duffy General Manager, Adult Health Services Unit, North H&SCP.
Reviewed by M Thomson

Page 2

2 
3. RECOMMENDATIONS
3.1 It is recommended that the IJB for Performance, Finance and Audit Committee
supports;
(1) The creation of a Project Board, overseeing the implementation of
improvement plans relating to HIS recommendations, internal Service Review
actions and MATS Standards.
(2) The ongoing funding and support for the Fixed Term Senior Improvement
Manager position.
(3) The work associated with locally identified Milestones for the service, as noted
in the Annual Delivery Plan for 2023/24 as per summary table below
Table 1- Annual Delivery Plan 2023/24 Summary 
Summary We aim to deliver against 2022 HIS Inspection Recommendations and
against all remaining actions from our internal Service Review in 2022,
and to deliver MATS in Justice. We aim to end 2023/24 with plans for
sustainable performance and future delivery against the changes.
Q1 1. Senior Service Improvement manager in post and inducted.
2. Measurable advancement evident in the delivery of the 6 priority
recommendations from the 2022 HIS inspection.
3. Advancement in the acquisition of a LES for GP services.
4. Improvement Plan in place for HIS recommendations and actions
from NHSL service review, feeding into established Performance
Review Processes.
Q2 1. LES agreed, or advancement on contingency plan if LES
unsuccessful.
2. Measurable advancement and delivery of 6 HIS priority areas.
3. Measurable advancement in NHSL service review actions.
4. New Team leader in post and Return to full shift nursing coverage
(9pm).
Q3 1. Host return visit/inspection by HIS and report on delivery against 6
priority recommendations including GP services.
2. Workforce Model review planned and date identified to commence
work.
3. Measurable improvement in the management of LTC in the prison
population under the newly created structure with nursing staff and GP
services jointly leading.
4. Established Programme Board for justice related services with
prison healthcare a central component in conjunction with MATS
standards.
Q4 1. Measurable delivery of all actions from the NHSL service review.
2. Measurable delivery and maintenance of all recommendations from
HIS inspection.
3. Consultative and preparation work complete for Workforce Model
review and plan in place to begin implementation.

Page 3

3 
4. VARIATIONS TO DIRECTIONS? 
Yes ☐ No ☐ N/A ☒ 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Background
5.1.1 Responsibility for the provision of healthcare in prisons transferred from the
Scottish Prison Service (SPS) to the NHS in November 2011 and for HMP Shotts in
Lanarkshire, it is now the responsibility of the North Lanarkshire H&SCP. HMP Shotts,
a 538 place, maximum security prison for convicted adult males serving a sentence of
four years or longer has a healthcare team that comprises of three sub-teams teams
of Primary Care team, Addictions Team and Mental Health Team. 
5.1.2 It is an isolated professional working environment, and there are significant
cultural challenges related to partnership working with the Scottish Prison Service
(SPS).  The previous permanent on-site Senior Nurse model has been replaced with
a Senior Nurse and Service Manager ‘in reach’ model providing regular presence on-
site and work with the Teams. 
5.1.3 Over the last 24 months the healthcare team has experienced significant and
sustained staff shortages across all disciplines. This has impacted on the team’s ability
to provide adequate staffing and maintain a safe skill mix. This included the lack of GP
cover from 1:30pm onwards. 
5.1.4 Due to the apparent challenges, the Nurse Director commissioned a ‘deep dive
Service Review to be undertaken. This was completed in March 2022 and an action
plan was developed identifying planned improvement actions. 
5.2 Her Majesty’s Inspectorate of Prisons for Scotland Inspection 
5.2.1 Her Majesty’s Inspectorate of Prisons for Scotland (HMIPS) undertook an
inspection of HMP Shotts from 09- 22 May 2022, supported by Healthcare
Improvement Scotland (HIS) who reviewed Prisoner Healthcare under Standard 9:
Prisoner Health & Wellbeing. (HIS noted that an internal Service review had taken
4. Commencement of work on plan to provide sustainability and
maintenance of the delivery of HIS recommendations and Service
Review actions (audit cycle, reporting mechanisms etc.).
5. Measurable improvement in service performance and compliance as
agreed in performance framework/KPI process.

Page 4

4 
place ahead of their inspection and commented that this had been an area of good
practice). 
5.2.2 Resultantly, the nurse staffing recruitment and retention issues and associated
subsequent impact on patient care, resulted in a grading of ‘Poor’ for NHS Lanarkshire.
Whilst the report recognised the considerable efforts made to support the healthcare
needs of patients in HMP Shotts, HIS noted;
 Five quality indicators were rated as satisfactory,
 Six quality indicators were rated as generally acceptable
 Five quality indicators were rated as poor.

5.2.3 There were 12 examples of good practice and 22 recommendations for
improvement which include 6 priority recommendations. The Inspection Report is
listed in Section 8..
5.3 Progress to Date
5.3.1. As noted in the full report, there were 22 Recommendations. The present status
of progress is detailed within Table 2 and a breakdown of these recommendation are
detailed within Appendix 1 – HIS Review Recommendations Update .
Table 2. Current Position on HIS Recommendations 
Criteria No of
Recommendations
Current Position on Open
Recommendations
RED AMBER GREEN
Total
Recommendations
22 0 
Open
Recommendations
16 0 13 3
Closed/Complete
Recommendations
6 0  6 
5.4 Service Review Model
5.4.1 The Internal NHSL Service Review produced an action plan with 32 Actions.
The present status of progress of these actions are detailed within Table 3 and a
further breakdown of these actions are detailed within Appendix 2 -Service Model
Review Update.
Table 3. Current Position on Service Review Actions 
Criteria No of Actions Current Position on ‘Live’ actions
RED AMBER GREEN
Total Actions 32 0 
Open/Ongoing
Actions
10 0 4 6

Page 5

5 
Closed/Complete
Actions
22 0  22 
5.4.2 The implementation of the HIS recommendations and the actions from the
Service Review has been formally supported by North Lanarkshire H&SCP with
fixed-term funding for a Senior Improvement Manager, who will oversee and co-
ordinate Improvement work to ensure the delivery of all Recommendations and
Actions.
5.4.3 Additionally, it is planned that the work required in conjunction with associated
work (specifically MATS in Justice) will be managed under the oversight of a
Programme Board.
5.4.4 The Senior Service Improvement manager is now in post and is currently
developing an amalgamated Implementation and Improvement plan which will be
presented at the initial meeting of the Programme Board in June 2023.
5.4.5 Work is ongoing on staff recruitment and retention with a continued plan for
Recruitment events, an application for a Secure Environment Allowance to S.T.A.C.
and a current piece of work to create a Local Enhanced Service for the provision of
GP cover, with one interested practice currently engaging in fact-finding and
observation/participation in GP work as a way of assessing compatibility. 
6. CONCLUSIONS
6.1 The management of Service Improvement and MATS standards is essential, and
it is imperative that the improvement agenda is supported and implemented.
6.2 In order to meet the healthcare needs of prisoner patients, it is essential that the
detailed recommendations and actions, including an improved workforce model are
implemented.
6.3 The continued endorsement of and support for the incumbent Senior Service
Improvement Manager post (Fixed Term for 18 months) is central to success in
delivery.
6.4 achievement of our key Q1-Q4 Milestones in the Annual Delivery plan is
essential to evidence the required improvement.

Page 6

6 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES Link(s) to National Health & Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services
☒
Health and Social Care Services contribute to reducing health inequalities ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services
☒
7.2 ASSOCIATED MEASURE(S)
 HIS Standard 9: Prisoner Health & Wellbeing.
 The identified actions and service and quality requirements as noted in the
internal Service Review.
 Compliance with MATS Standards
 Generic management standards and performance requirements (including
Financial balance and staff governance measures). 
7.3 FINANCIAL
7.3.1 The Summary finance position for Prisoner Healthcare to the end of reporting
year 2022/23 (and subsequently updated to present for the purposes of this report) is
illustrated below. (Full detailed accounts are available).
7.3.2 There was an overspend mainly in non-pay which was largely characterised by
the costs associated with the supply of medicines which when isolated as a cost on
its own experienced an overspend of circa £170k in 2022/23. The supply of Buvidal
is a significant contributory cost within this. 
Table 4- Summary Financial Position 
Nhsl Prisoner
Healthcare Month 12 2022/2023 
Report Refreshed On 18-
May-23

Page 7

7 
Annual
Budget 
YTD
Budget  YTD Actuals
YTD
Variance 
Period
Budget
Period
Actuals
Period
Variance 
Pay  1,347,509   1,347,509  1,325,641  21,868   107,431  120,768  (13,337) 
Non Pay  436,188   436,188  582,202  (146,014)   36,349  212,103  (175,754) 
Nhsl Prisoner Healthcare
Total 1,783,697 1,783,697 1,907,844 (124,147) 143,780 332,871 (189,091) 
Staffing cost variances due to staffbank and agency nurse cover were largely
tempered by the high nursing vacancy factor, as recruitment and retention of nursing
staff continues to be a challenge. Pays therefore show as an underspend for
2022/23. 
7.3.3 This paper has been reviewed by Finance: 
Yes ☒ No ☐ N/A ☐ 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details
Current Risk Level Risk Owner
1.  Healthcare
Provision for HM
Prison Shotts:
Recruitment &
Retention issues
mean that we are
unable to provide
cover between
18.00 and 21.00
hrs. A safe
alternative is in
place until staffing
levels improve.
High J Duffy
Relevant Risk Register
Details
Current Risk Level Risk Owner
2.  Illicit substance
misuse in prisoner
group resulting in
Ambulance
conveyance to ED
and admission to
acute hospital.
Low J Duffy
Relevant Risk Register
Details
Current Risk Level Risk Owner
3.  Nurse Staffing
levels at HM Prison
Medium J Duffy

Page 8

8 
Shotts: Turnover
and vacancy factor
is high and this has
resulted in costs
for Staffbank and
agency nurse
cover. Actions and
mitigation in place
to address this
issue.   
7.5 ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken. 
Objectives Further Details
☒ Involve stakeholders in the development
work aimed at achieving the national
outcomes
A programme Board is being
established for prisoner healthcare
and MATS standards. Multiple
stakeholders will be included.
Discussion is ongoing on how best
to incorporate prisoner/family
inclusion.
☒ Provide stakeholders with information on
how to get involved
Information on engagement will
emerge form Programme Board
actions
□ Ensure a diverse range of engagement
and participation and opportunities are in
place to suit different needs
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Measure how well we involve community
stakeholders in the planning, design
and delivery of our services
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Develop participation guidelines to
ensure a common understanding and set of
expectations for both stakeholders and
partnership staff
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Support engagement planning and
participation in localities, taking account of
Not yet in place but to be developed
at and Overseen by Programme
Board

Page 9

9 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes ☐ No ☒ N/A ☐ 
EQIA added to website: 
Yes /
Date
added
☐ No ☐ N/A ☒ 
8. BACKGROUND PAPERS
Paper 1 HMIPS-HMP Shotts Report on Full Inspection 
9. APPENDICES
Appendix 1- HIS Review Recommendations Updated 17th May 2023
Appendix 2- Service Model Review Update 17th May 2023 
CHIEF ACCOUNTABLE OFFICER (or Depute) 
Members seeking further information about any aspect of this report, please contact
the following;
Maggs Thomson, maggs.thomson@lanarkshire.scot.nhs.uk
other engagement activity and local plans
across the Community Planning
Partnership

Page 10

10

Page 11

11 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number 
2 Report Title 
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed

Page 12

Paper 1 
Report on HMP Shotts 
Full Inspection
9-20 May 2022

Page 13

CONTENTS 
Introduction and Background
Key Facts
Overview by HM Chief Inspector of Prisons for Scotland
Human Rights Based Approach Overview
Summary of Inspection Findings 
Standards, Commentary and Quality Indicators
Standard 1 Lawful and Transparent Custody
Standard 2 Decency
Standard 3 Personal Safety 
Standard 4 Effective, Courteous and Humane Exercise of Authority
Standard 5 Respect, Autonomy and Protection Against Mistreatment
Standard 6 Purposeful Activity
Standard 7 Transitions from Custody to Life in the Community 
Standard 8 Organisational Effectiveness
Standard 9 Health and Wellbeing
ANNEXES
Annex A Summary of Recommendations 
Annex B Summary of Good Practice 
Annex C Summary of Ratings 
Annex D Prison Population Profile on 
Annex E Inspection Team 
Annex F Acronyms used in this Report 
EVIDENCE REPORT 
The full inspection findings and overall rating for each of the quality indicators.

Page 14

1 
INTRODUCTION AND BACKGROUND 
This report is part of the programme of inspections of prisons carried out by
Her Majesty’s Inspectorate of Prisons for Scotland (HMIPS).  These inspections
contribute to the UK’s response to its international obligations under the Optional
Protocol to the UN Convention against Torture and other Cruel, Inhuman or
Degrading Treatment or Punishment (OPCAT).  OPCAT requires that all places of
detention are visited regularly by independent bodies known as the National
Preventive Mechanism (NPM); which monitor the treatment of and conditions for
detention.  HMIPS is one of 21 bodies making up the NPM in the UK. 
Her Majesty’s Chief Inspector of Prisons for Scotland (HMCIPS) assesses the
treatment and care of prisoners across the Scottish Prison Service (SPS) estate
against a pre-defined set of Standards. These Standards are set out in the
document ‘Standards for Inspecting and Monitoring Prisons in Scotland’, published in
May 2018 which can be found at
https://www.prisonsinspectoratescotland.gov.uk/standards. 
The Standards reflect a rights based approach to an independent inspection of
prisons in Scotland and are also designed to provide information to prisoners, prison
staff and the wider community on the main areas that are examined during the
course of an inspection.  Our report provide assurance to Ministers and the public
that inspections are conducted in line with a framework that is consistent and that
assessments are made against appropriate criteria. While the basis for these
Standards is rooted in International Human Rights treaties, conventions and in
Prison Rules, they are the Standards of HMIPS. This report and the separate
‘Evidence Report’ are set out to reflect the performance against these standards and
quality indicators. 
HMIPS assimilates information resulting in evidence-based findings utilising a
number of different techniques. These include: 
 Asking the Governor or Director in Charge for a self-evaluation – summary of
their progress against previous recommendations, the challenges they face
and the successes they have achieved.
 Obtaining information and documents from the SPS and the prison inspected.
 Shadowing and observing SPS and other specialist staff as they perform their
duties within the prison.
 Interviewing prisoners and staff on a one-to-one basis.
 Conducting a pre-inspection health and wellbeing survey of prisoners, and
focus groups with both prisoners and staff.
 Observing the range of services delivered within the prison at the point of
delivery.
 Inspecting a wide range of facilities impacting on both prisoners and staff.
 Attending and observing relevant meetings impacting on both the
management of the prison and the future of the prisoners such as Case
Conferences.
 Reviewing policies, procedures and performance reports produced both
locally and by SPS Headquarters (SPS HQ) specialists.

Page 15

2 
HMIPS is supported in our work by inspectors from Healthcare Improvement
Scotland (HIS), Education Scotland, Scottish Human Rights Commission, the Care
Inspectorate, where appropriate the Children and Young People’s Commissioner for
Scotland, and guest inspectors from the SPS. 
The information gathered facilitates the compilation of a complete analysis of the
prison against the standards used. This ensures that assessments are fair,
balanced and accurate.  In relation to each standard and quality indicator, inspectors
record their evaluation in two forms: 
1. A colour coded assessment marker 
(APS TO INSERT) 
2. A written record of the evidence gathered is produced by the inspector allocated
each individual standard.  It is important to recognise that although standards are
assigned to inspectors within the team, all inspectors have the opportunity to
comment on all findings at a deliberation session prior to final assessments being
reached. This emphasises the fairness aspect of the process ensuring an unbiased
decision is reached prior to completion of the final report. 
This report provides a summary of the inspection findings and an overall rating
against each of the nine standards. The full inspection findings and overall rating for
each of the quality indicators can be found in the ‘Evidence Report’ that will sit
alongside this report on our website.

Page 16

3 
Key Facts
Location
HM Shotts is situated in the countryside, south of the M8 motorway near the
Lanarkshire village of Shotts. 
Role 
HMP Shotts is a maximum security prison for long-term adult male prisoners. It also
houses a national facility within its boundaries, the National Integration Centre (NIC),
which holds adult male prisoners who are in the initial stages of sentences of 8 years
or over and prepares them for the eventual movement to mainstream establishments 
Accommodation 
There are two main residential units; Lamont Hall and Allanton Hall. There is also a
14 cell Separation and Reintegration Unit (SRU). All accommodation is designed for
single occupancy and each cell has an integrated toilet and shower. 
Design capacity 
The design capacity is 538. 
Date of last inspection:  21 August – 1 September 2017 
Healthcare provider:  NHS Lanarkshire 
Learning provider:  Fife college

Page 17

4 
Overview by HMCIPS 
The Vision for Justice in Scotland 2022 aims to have effective, modern
person-centred and trauma-informed approaches to justice in which everyone can
have trust. 
Her Majesty’s Prison (HMP) Shotts was completely rebuilt in 2012 and has been
well designed, with single cell accommodation for 553 and facilities fit for its purpose
of holding long term adult male offenders. The prison was still in good physical order.
The prison seeks to provide a secure, safe, caring and productive environment, while
providing opportunities for offenders to come to terms with their sentences and
address their offending behaviour. 
HMP Shotts was the first full inspection where HMIPS’ health and wellbeing survey
was completed prior to the inspection; this provided valuable information to guide the
focus of the inspection. 
Like the rest of the SPS, HMP Shotts has faced significant challenges over the last
few years from the global pandemic. Staff shortages were evident across the
establishment with healthcare delivery, access to employment, staff training, staff
and prisoner engagement and evening activities detrimentally impacted. This was
compounded by a period of significant incidents prior to the inspection, mostly
substance related, that had affected the confidence of the prison. The national
introduction of photocopying of prisoner mail, however, has led to a clear and
welcome reduction in drug related incidents, and prisoners also reported they felt
safer. 
This report identifies a number of areas of good performance which are worth
celebrating, and which I hope will be taken up by other prisons in Scotland; for
example good use of multi-disciplinary approaches to substance misuse, health
promotion, and assisting with induction and adjustment to prison. We also saw good
use being made of the Prisoner Information Channel. 
Most significantly, however, HMP Shotts is the first public sector prison in Scotland
to install a digital ‘kiosk’ system. Used in many other jurisdictions, the positive
benefits are clear; the system enables prisoners to exercise control and
independence (and reduces paperwork for staff) by electronically choosing their
meals, booking their own visits, buying canteen goods and checking their spend
balance. HMIPS welcomes this initiative and looks forward to seeing this innovation
extended into the cellular accommodation and rolled out across the estate. 
HMP Shotts houses the National Integration Centre (NIC) which holds approximately
60 adult male offenders who are in the initial stages of a long or life sentence and
prepares them for eventual movement to mainstream prisons. We saw clear
evidence of constructive relationships between staff and prisoners, resulting in
suitably designed activities for each prisoner.  As in the 2017 report, it was
encouraging to see the operation of a Personal Officer scheme at its best.

Page 18

5 
The staff who worked in the SRU demonstrated a high level of commitment and skill
in working with often troubled and sometimes challenging prisoners.  Good team
working was evident, with investment in relationships producing positive results. 
Across the prison the Integrated Case Management (ICM) system was well
established with a clear focus on identifying and meeting the needs of individual
prisoners. Staff responsible for the operation of ICMs made effective arrangements
to promote the involvement of all prisoners and, where appropriate, family members. 
Despite staffing constraints, HMP Shotts are to be commended for increasing the
offending behaviour programme delivery during COVID-19 and for the resumption of
Education and chaplaincy activities. We would nevertheless now strongly urge the
early resumption of a return to a full regime. 
The report also highlights other areas where improvements can be made. 
Unfortunately, the significant and sustained pressures on healthcare staff and the
detrimental impact on patient care resulted in a grading of ‘Poor ‘for NHS
Lanarkshire but we nevertheless recognise the considerable efforts made in difficult
circumstances by staff within HMP Shotts and the North Lanarkshire Health and
Social Care Partnership (HSCP) to support the healthcare needs of patients in HMP
Shotts. 
Despite the well-established ICM process, the waiting list for prisoners to progress to
the National Top End (NTE) meant prisoners were delayed in progressing through
their sentence.  This problem is not exclusive to HMP Shotts and must be addressed
by the SPS. 
Echoing the 2017 inspection report, we were concerned that long term prisoners
were released back into the community from HMP Shotts without any formal
opportunity to develop key life skills as part of preparation for release during their
sentence. Prisoners due for release from the prison after many years also reported
that they lacked confidence about important parts of their integration plans,
especially housing options and access to mental health support. 
We were impressed by the responsiveness of HMP Shotts management team to
issues raised during the inspection, which provides hope for early successes in
returning to a full regime, staff and prisoner engagement, re-energising the equality
and diversity (E&D) agenda, and the development of a pre-release life skills
opportunity. 
We were concerned, however, that the Senior Management Team (SMT) and a
number of management posts below that had been occupied on a temporary
promotion basis for over two years; this was not conducive to stability and longer
term planning so we urge the SPS to secure some more permanent arrangements as
soon as possible. We were also aware that there had been tensions prior to our
inspection between the trade union side and the SMT, which had been de-stabilising;
it was encouraging to hear both sides say relationships were improving and we
welcome continued engagement towards shared goals.

Page 19

6 
We made 65 recommendations in total, but we would encourage a focus by the SPS
on firstly stabilising a permanent management team structure and on the following
key recommendations: 
Recommendation 14: The Violence Reduction Group should meet more regularly
to review violence reduction and ensure actions are taken, and the Violent Incident
Review (VIR) form submitted to Intelligence Management Unit (IMU) following a
Violent Incident Review Panel should be taken to the Violence Reduction Group
meeting for consideration as required by the strategy document 
Recommendation 15: SPS Anti-bullying Strategy ‘Think Twice’ requires to be  re-
launched to overcome the identified deficits e.g. only 40% of the staff are
trained. Posters should be replenished across the establishment and a re-audit of
incidents should take place to ensure all incidents of bullying, intimidation or
harassment are investigated and taken seriously 
Recommendation 21: HMP Shotts should increase the C&R competency of staff to
the accepted level as a priority. 
Recommendation 22: HMP Shotts must ensure that all planned removals are
recorded unless there is reasonable mitigation. 
Recommendation 33: SPS HQ should review the policy for implementing a national
waiting list for access to programmes and its capacity for delivering programmes
against demand to ensure there is no detrimental effect on the care of individuals in
custody or their ability to progress. 
Recommendation 35: HMP Shotts should continue to support ICM staff to address
the backlog and bring all case conferences up to date. 
Recommendation 41: HMP Shotts should prioritise re-energising the E&D agenda,
including regular meetings of the E&D committee with prisoner representation,
development of an E&D action plan, more systematic monitoring of data to avoid
unintentional bias with employment, education and discipline, etc., and provide
comprehensive training for the E&D Manager. 
Recommendation 44: North Lanarkshire HSCP must ensure that all prisoners
transferred to HMP Shotts are reviewed by a nurse before being admitted into the
prison. 
Recommendation 48: North Lanarkshire HSCP must revise without delay, the
process in place when identifying long term health conditions and provide assurance
that patients are reviewed in line with what is equitable in the community to address
health inequalities. 
Recommendation 52: North Lanarkshire HSCP as a matter of urgency must review
the medical cover available in the afternoons to:
(i) ensure the risk to patients is reduced.
(ii) support nursing staff in dealing with emergency situations.

Page 20

7 
Recommendation 57: As a priority North Lanarkshire’s HSCP must action the
recommendations made in their service review regarding pharmacy provision and
support to provide a service equitable with the community 
Recommendation 62: NHS Lanarkshire HSCP must ensure that all staff managing
complaints receive training to ensure that all complaints are correctly managed. 
Recommendation 65: North Lanarkshire HSCP must demonstrate implementation
of recommendations from service review and provide clear pathways to support staff
on site in HMP Shotts in the absence of senior staff. 
Finally, we would like to thank all the staff, partners and prisoners in HMP Shotts for
their time and commitment to the inspection.

Page 21

8 
Human Rights Based Approach Overview 
HMIPS is a Human Rights organisation. As such, we ground all of our inspections in
Human Rights principles. Our standards are written with the international human
rights framework in mind, and our inspectors apply these standards through a human
rights based approach. 
The human rights-based overview of the inspection of HMP Shotts follows the
PANEL headings, illustrating how human rights are applied to the inspection as a
whole. This overview is not exhaustive of all human rights observed and engaged,
but is intended as a brief synopsis of the implementation of a human rights-based
approach in HMP Shotts. 
HMIPS’ human rights-based approach to inspection is a critical element of ensuring
both that the human dignity of the prisoner is upheld and that prisons are places of
productive, positive and useful education, work and interaction, leading to better
outcomes in reducing recidivism and keeping our communities safer. 
Overview 
While there may not have been sufficient human rights language built into policies
and actions at HMP Shotts, it was clear that the establishment respected basic
principles of human rights in their day-to-day outcomes. This was pleasing to
observe. 
As we will go onto report, the establishment did not have adequate human rights
based infrastructure built into their procedures. Prisoners were not routinely
consulted on matters that affected their lives and there were only very early signs of
a participatory model returning to HMP Shotts, post COVID-19. 
The Governor and Dep. Governor exhibited a strong grip of human rights principles,
dealing with human rights and equality matters in an appropriate, swift and effective
manner when they reached them. Due to a mix of high staff turnover, capacity issues
and the pandemic, this approach had unfortunately not trickled down to middle and
front line managers who demonstrated gaps of experience and competency of these
matters. This was no fault of the personnel in question, but a reflection of the need of
the establishment to run up to date and robust training to all staff, and HMIPS would
encourage the SPS and HMP Shotts to do so. 
The SPS have a positive obligation under article 2 of the ECHR right to life, and the
CPT statement of principles reinforced that in the context of COVID-19 “The basic
principle must be to take all possible action to protect the health and safety of all
persons deprived of their liberty. Taking such action also contributes to preserving
the health and safety of staff.” 
HMIPS do not underestimate the strain COVID-19 placed on establishments. It was
right and proper that protecting the health and safety of both prisoners and staff took
priority over certain functions of prison management. We now expect prisons to put
in place mechanisms to restore regime, meaningful activity and engagement at pace.
Too often during the course of this inspection, inspectors were told that activities had

Page 22

9 
been paused due to the pandemic, without the accompanying rationale, risk
assessments or mitigations we would expect. As we will go on to report, prisoners
need to be consulted, feel empowered and have meaningful say over their lives. 
With cancelling of Prisoner Information and Action Committees (PIACs), for example,
this minimised the opportunity for this to occur. To the establishment’s credit, it
seemed various activities we would expect were beginning to be reinvigorated, but
this was not happening at the sort of pace inspectors would like to see. 
Overall, HMP Shotts was an establishment that respected the basic foundations of a
human rights approach in their outcomes. HMIPS would encourage the
establishment to go further, embedding the culture within staff of all levels, and
establishing a firmer grip of human rights and equality throughout their processes. 
PANEL 
Participation 
“Prisoners should be meaningfully involved in decisions that affect their lives” 
Despite a background of a good participatory model in the past, which HMIPS have
previously been pleased to report – disappointingly, at the time of inspection
HMP Shotts demonstrated neither consistent nor robust examples of prisoner
participation. 
PIACs can be a good opportunity to meaningfully involve prisoners in decisions that
affect the prison. Unfortunately, these were not utilised at HMP Shotts. While there
was a plan to re-establish a PIAC model, they had been suspended throughout the
pandemic which significantly hampered prisoner’s ability to feel that their voice
mattered. It was also noted by inspectors that the National Induction Presentation did
not cover PIACs, which meant a key vehicle for prisoners to be represented was not
being brought to the attention of newly arriving individuals. 
While staff and prisoner relationships were good, it was clear to inspectors that
prisoners in general did not feel that their opinions, views and thoughts were a
priority to staff in decision making. HMIPS encourages HMP Shotts to develop their
PIAC model further. While it does not involve cumbersome work, a good PIAC model
can greatly influence the participatory success of an establishment and help make
prisoners feel heard and engaged. 
If the establishment had concluded that a formal PIAC model was unachievable due
to the pandemic, HMIPS would have hoped to see more informal, yet meaningful,
attempts at consultation by staff to mitigate this. We saw no such evidence. 
The only exception to this was the good practice demonstrated by the library team
who actively sought feedback on the library stock, rules, service and environment.
The library assistant engaged prisoners who attended the library, and importantly,
those who didn’t by seeking feedback on the halls. She displayed the feedback
quarterly and reported back to all service users what had been changed as a result
of opinions and views gathered. Inspectors were impressed by this approach and it

Page 23

10 
represented very good practice indeed. HMIPS would encourage HMP Shotts to take
elements of this practice and incorporate it throughout the prison. 
Inspectors marked the E&D provision of the establishment as poor in QI 8.1. This
was for three main reasons: 
1) The E&D Committee had been suspended for a prolonged period of time and had
only just begun to be reinvigorated. E&D concerns do not cease due to the pandemic
and it is incumbent on the establishment to actively ensure those with protected
characteristics and the most vulnerable are not being disproportionately affected by
prison rules, especially during a pandemic. Inspectors were not satisfied that HMP
Shotts demonstrated they had the appropriate mechanisms in place to assess if this
was occurring. 
2) There was a lack of awareness and competency amongst staff of their obligations
concerning E&D, including members of the E&D Committee. The Committee were
well intentioned, but did not have sufficient training to perform their role. The E&D
Manager was being supported by a member of the SMT, but disappointingly had
received no training in E&D matters. It is important that prison staff receive E&D
training on how to respect the rights and meet the specific needs of detainees in
situations of vulnerability, and the skills necessary for working with them. Rule 75 of
the Mandela Rules is clear that the prison administration has to ensure the
continuous provision of in-service training courses with a view to maintaining and
improving the knowledge and professional capacity of its personnel, after entering on
duty and during their career. 
3) There was no local action plan, strategy or policy. What intentions the Committee
were able to provide did not include focussing on systemic issues vulnerable
individuals may be experiencing and were instead more focussed on awareness
raising. HMIPS would expect to see a combination of both approaches in the
Committee’s plans. 
There had also been no outreach to prisoners to have a prisoner representative on
the E&D Committee. This is a key part of ensuring minority groups within an
establishment are represented. Although inspectors were told this was in process
and would hopefully be occurring shortly. 
Inspectors found a lack of awareness among prisoners of available processes where
they could influence decision-making. 
In general, it was clear to inspectors that participation had not been a priority for the
prison in recent times. There were very early signs of a participatory model returning
to HMP Shotts, but this must be developed further to embed a culture and
meaningful involvement of prisoners in decision making. 
Components to the principle of participation include that it must be active, free and
meaningful and give attention to issues of accessibility, including access to
information in a form and a language that can be understood. HMIPS would expect
that any barriers to participation are identified and that those prisoners would be
assisted to overcome them in order to meaningfully participate.

Page 24

11 
Accountability 
“There should be monitoring of how prisoner’s rights are being affected as
well as remedies when things go wrong” 
There was a framework of administrative accountability in the prison. However,
effective accountability based on human rights standards were not consistent at the
time of the inspection. This is not to say that human rights were readily ignored;
however reference to standards, rules and human rights-based criteria were minimal. 
HMIPS found prisoners had little faith in the complaints system and a low level of
confidence. On review of PCF1 and PCF2 complaints, inspectors found responses to
be timely, robust and appropriate. In particular, PCF2 responses were worthy of
mention, the Governor took time to investigate matters diligently and provided full
responses to those submitting complaints. The Governor (or Deputy Governor) 
would frequently meet with prisoners who had submitted PCF2 complaints to discuss
their concerns and follow up with a written note. HMIPS were pleased to see the
senior management of HMP Shotts took complaints seriously and dealt with them
robustly. 
That said, the establishment should take more steps to recognise the disconnect
between prisoners and the complaints system. Prisoners need to be assured that
their voice is listened to and that authorities are accountable when things go wrong.
Despite the process appearing robust when complaints were received, more effort
should be taken to provide prisoners with confidence in the process. 
More widely, HMIPS have concerns about the extent to which the SPS complaints
matches the best practice model articulated by the Scottish Public Services
Ombudsman, but HMP Shotts implemented the current system effectively. 
However, in line with our remarks above around the E&D processes at HMP Shotts,
inspectors did have concerns around the use of equality and diversity form (EDF)
complaints. An EDF acts as an addendum to a PCF complaint where the complainer
believed the issue to concern an E&D matter. Where such a form was attached, the
complaint was sent to the E&D manager to investigate and reported back separately.
These complaints should be reviewed by the E&D Committee to identify systemic
issues that may be going wrong and address them prison-wide. While not unique to
HMP Shotts, inspectors found this process to be lacking. The process of dealing with
an EDF complaint did not differ in any clear way, in either process or outcome, from
a standard PCF complaint – rendering it without value. HMIPS would strongly
encourage SPS HQ to re-examine processes and procedures in place around E&D
complaints. 
Internal audits from the establishment were mixed, but mostly positive. Compliance
processes appeared to be highly efficient and well managed. The establishment had
taken decisive action to address the areas of poor performance identified in the
previous HMIPS inspection report. Of some concern was the PRL audit around E&D
which suggested a 100% compliance rate. This was not in line with inspector’s
findings and we would suggest HMP Shotts review their internal reporting.

Page 25

12 
NON-DISCRIMINATION 
“All forms of discrimination must be prohibited, prevented and eliminated. The
needs of prisoners who face the biggest barriers to realising their rights
should be prioritised.” 
Non-Discrimination requires the duty bearer to go further than not actively
discriminating – it is not a passive duty but an active one, to make deliberate efforts
to prevent discrimination from occurring in all forms. In this regard, inspectors saw
positive examples from HMP Shotts in almost all of our standards. 
Induction material was provided in a number of different languages and the
establishment had a good procedure in place for use of translation services where
necessary. The induction officer and the librarian had a good working relationship
where she would advise the library of any arriving prisoners who spoke a foreign
language, allowing the library to source material which the prisoner could access. 
The library in general had a good selection of foreign language books, although it
was disappointing to hear that the main supplier of foreign books to the library had
recently gone out of business. The library was actively seeking a new supplier and it
is hoped this can be achieved without delay. 
Foreign national prisoners reported feeling safe and having their basic needs met. 
A personal emergency evacuation plan (PEEP) list was provided and the
requirements of individuals spoken to confirmed they should be on the list. Officers
demonstrated good knowledge of the individuals and the background behind their
requirements. Accessible cells were of a good standard and met the needs of those
occupying them. 
In general, prisoners were supported to practice their religion and afforded the
appropriate faith based meal by the Kitchen. Inspectors were informed that HMP
Shotts had previously had a policy whereby Jewish prisoners requesting a Kosher
meal were required to prove their religious heritage to be eligible for a Kosher meal.
This was poor practice, and HMIPS are pleased to hear it has been overturned by
the current prison administration. Inspectors were informed of an occasion where the
previous policy had mistakenly been applied by a member of staff, and we would
encourage the establishment to ensure all staff are up to date with policy to ensure
this is not repeated. The chaplaincy was excellent and, despite staffing issues, were
supporting prisoners of all faiths and none. 
Access to “enhanced work parties” which paid slightly more and were for low risk
prisoners was not equal for protection and non-protection prisoners. HMIPS
recognise the difficulty in allocating work in a large prison with a varied population,
but we encourage the establishment to try to afford equitable access across the
population.

Page 26

13 
Empowerment 
“Everyone should understand their rights, and be fully supported to take part
in developing policy and practices which affect their lives” 
Much of the discussion above around participation and accountability also applies to
empowerment – prisoners cannot be empowered if they do not have
opportunities to participate or do not have recourse to hold authority to account. We
would expect prisoners to understand their rights and be fully supported in utilising
them. 
Inspectors were pleased to note that prisoners could easily request maintenance
issues to be logged, mattresses replaced or their cell to be painted. This level of
empowerment over their own environment was pleasing to observe. 
Information provision was adequate, with copies of the prison rules, SOPs, and
legislation available on request. This could be improved by having the material in
easy reach of prisoners without having to request it. It is also important from an
empowerment perspective for prisoners to know what sort of legal texts are available
to them, while it is reassuring that the prison make the material available to
prisoners, this should be signposted better. 
HMIPS found discipline hearings and case conferences supported prisoners well,
allowing them to understand the actions taken against them. There was time taken to
explain decisions and the actions prisoners could take if dissatisfied with any
outcomes. Inspectors found that generally prisoners understood why they were being
managed in a certain way, and what was expected of them to turn their situations
around, particular when being managed under rule 95. 
HMP Shotts piloted a Kiosk system which allowed prisoners to use a computer
system in their hall to access important material, make meal choices and other
functionality. Once this system is fully exploited, this will be a good example of
empowerment. The establishment must be careful to ensure individuals of all
technical and literacy ability are supported to use the system, but in general HMIPS
are very supportive of its incorporation and extension. 
HMIPS would like to see prisoners at the centre of policy and decision making, with
more engagement and involvement at all levels. 
LEGALITY 
“Approaches should be grounded in the legal rights that are set out in
domestic and international laws” 
A human rights-based approach requires the recognition of rights as legally
enforceable entitlements and is linked to national and international human rights law.
The UK must respect the UN Standard Minimum Rules for the Treatment of
Prisoners (Nelson Mandela Rules); the European Prison Rules; The Convention
against Torture, including the Optional Protocol and others. It is important that all
categories of prisoners enjoy the full range of human rights and that staff are

Page 27

14 
adequately supported. Inspectors have identified areas where they believe further
action is required, in particular to ensure that more marginalised prisoners do not fall
through the gap. 
The realisation of human rights is facilitated in practice by both the provision of
information and the need for proactive action to be taken to ensure prisoners are
accessing their rights in practice. A human rights-based framework is concerned with
anticipating areas of prison life where problems are likely to arise, responding to
prisoners needs as they are raised and building in monitoring mechanisms to ensure
systems are improved through experience. This is the sort of human rights
infrastructure which could be further developed at HMP Shotts. Inspectors did not
find practice which directly called into question the legality of the establishment, but
we do encourage HMP Shotts to work harder to actively apply a human rights based
approach in their activities.

Page 28

15 
STANDARDS, COMMENTARY AND QUALITY INDICATORS
STANDARD 1 - LAWFUL AND TRANSPARENT CUSTODY
The prison complies with administrative and procedural requirements of the law,
ensuring that all prisoners are legally detained and provides each prisoner with
information required to adapt to prison life. 
The prison ensures that all prisoners are lawfully detained.  Each prisoner’s
time in custody is accurately calculated; they are properly classified, allocated
and accommodated appropriately. Information is provided to all prisoners
regarding various aspects of the prison regime, their rights and their
entitlements. The release process is carried out appropriately and positively
to assist prisoners in their transition back into the community. 
Inspection Findings 
Overall Rating:  Satisfactory performance 
In this standard, one quality indicator was not applicable, seven were rated as
satisfactory performance and one was generally acceptable giving an overall rating
of satisfactory performance. There was one example of good practice and two
recommendations for improvement. 
HMP Shotts was a long-term establishment that did not receive prisoners directly
from court, only transfers from other establishments.  Therefore, new arrival numbers
were low and every prisoner had spent time in another establishment prior to
arriving.  For this reason, prisoners already knew their release dates and had a good
understanding of how prisons in Scotland run.  The prison also had the benefit of
knowing who was arriving and when, which allowed them to classify prisoners in
advance and agree their location within the prison.  If a prisoner attended court whilst
in custody and the outcome affected their release dates, there were efficient
processes in place to inform prisoners and interested parties of their new dates. 
Due to the low number of prisoners arriving, inspectors were only able to observe
one new admission during the inspection.  However, staff were able to clearly
explain the processes, which were supported by Standard Operating Procedures
(SOPs). A Reception Risk Assessment (RRA) and First Night Admissions Checklist
were completed for every prisoner, and inspectors were content that all prisoners
were assessed regarding their ability to understand and had the opportunity to
engage with the admissions process. 
Prisoners were provided with sufficient information about HMP Shotts via the First
Night in Custody Checklist and the National Induction Presentation (NIP), which was
offered to all prisoners.  The induction officer proactively met with every prisoner to
encourage them to attend and establish their background, and then tailored it to their
needs.  It was delivered on a one to one basis or occasionally in small groups and
was well received by prisoners.  A helpful Family Information Awareness Package
and face to face induction session was available to friends and family of prisoners in

Page 29

16 
HMP Shotts.  SPS HQ need to review the NIP and booklet to ensure that it provides
up to date information to prisoners. 
There were good processes in place for liberating prisoners and the release process
ran smoothly. 
The staff undertaking the admissions, induction and liberations process were
friendly, polite and professional, and knowledgeable about their role.  Prisoners
spoken to were content that they had received the information they required. 
In terms of the PANEL principles for this Standard: 
Participation.  Prisoners were invited to engage in the admissions process via
the RRA form and the First Night Admission Checklist. Both of which were
completed in a confidential setting. 
Accountability. There were efficient processes in place for admission to and
liberation from HMP Shotts. During the reception process and on arrival at the
hall, prisoners were provided with information about their entitlements.  The
Links Centre Officer met with every prisoner in advance of their induction and
tailored the presentation to suit their needs. The officer also met with them in
advance of their liberation to offer support and guidance appropriate to their
needs e.g. benefits advice, applications for ID. 
Non-discrimination and equality.  Prisoners were classified and allocated to
an area in the prison in advance of them arriving, so they were quickly placed in
the area that best suited their needs.  Prisoners that required additional
assistance with the admissions process were identified on arrival at reception.
Translation services were available and guidance for staff on how to use them.
Prisoners were offered guidance and support in advance of their liberation date. 
Empowerment. Prisoners were provided with an Admission Information Pack
in reception and were taken through a First Night Admissions Checklist on
arrival at their residential hall.  There was sufficient information provided in
these to enable the prisoner to know their rights in advance of attending a full
induction session, which provided further valuable information. The checklist
and the RRA enabled staff to identify prisoners with additional needs.  All
documentation was available in nine other languages, braille and British Sign
language (BSL). 
Legality.  Staff followed the lawful procedures and completed them in a
professional manner. 
Encouraging observations 
 The Family Information Awareness Package for families and friends of
prisoners

Page 30

17 
Emerging concerns 
 SPS HQ should take action to update the NIP and booklet to ensure it provides
up-to-date information to prisoners.
 The Link Centre Officer responsible for delivering induction was a singleton post
and there was no cover during absence.

Page 31

18 
Quality Indicators 
1.1 Upon arrival all prisoners are assessed regarding their ability to
understand and engage with the admission process. 
Rating:  Satisfactory performance 
HMP Shotts did not receive prisoners directly from court, therefore the opportunity to
observe the admissions process was greatly reduced.  However, staff were able to
walk inspectors through the process and although only observing one admission,
standards were fully met.  The reception area was quiet and calm due to the low
number of admissions, which contributed to a relaxed experience for those arriving. 
If more than one prisoner arrived at reception, they were brought off the escort van
one at a time and processed at the staff desk, which allowed for confidential
discussions to take place.  Assessing their ability to understand and offering an
opportunity to engage in the admissions process was done via the RRA form.
Reception staff asked many of the RRA questions whilst searching the prisoner in a
private setting, which reduced the admission time and made the process more
relaxed.  Reception officers were friendly, polite and professional when interacting
with prisoners.  An RRA was also completed for those returning from court or
hospital and all prisoners coming through reception saw a nurse in a private room. 
Foreign national prisoners were directed to the language identification charts to
ascertain which language they spoke. There was a folder held with instructions on
how to use translation services, but inspectors were advised that it was rarely
required. 
There were two SOPs covering the admissions process, one of which was
specifically for prisoners’ subject to or suspected to be infected with COVID-19.
Inspectors observed that staff followed the instructions laid out. 
Inspectors were informed that admissions could be processed quite quickly
dependent upon how much property came with them. 
Inspectors spoke to prisoners who had recently been admitted and they were all
positive about the experience and the staff working in reception. 
Reception staff had received relevant training to carry out their role. 
1.2 On admission, all prisoners are provided with information about the
prison regime, routine, rules and entitlements in a form that enables the
prisoner to understand. 
Rating:  Satisfactory performance 
Prisoners arriving at HMP Shotts had already spent time in another establishment.
Therefore, they had an understanding of how prisons run, and the core screen
paperwork had already been completed and information recorded on PR2.

Page 32

19 
New admissions were provided with an Admission Information Pack in reception,
written by the person responsible for delivering induction. The pack provided
prisoners with enough of an understanding about how HMP Shotts ran and their
entitlements until they could be offered a fuller induction.  The pack was available in
nine different languages, BSL and braille, and staff were aware of how to use
interpretation services if required. 
With the exception of the race relation statement, there was no information displayed
on the walls of the reception or holding areas.  Inspectors were informed that the
TVs with an information channel and posters had been removed as they were being
destroyed.  HMP Shotts should consider reintroducing them to reinforce the
information provided in the pack and also help prisoners pass their time in reception. 
There were no peer supporters working in the reception area and HMP Shotts
should consider adding peer supporters in this area. 
On arrival at their hall of allocation, prisoners were taken through a First Night
Admissions Checklist by residential staff, usually in the evening once prisoners had
been locked up to allow officers sufficient time with people.  Again prisoners had
gone through a first night in custody process at their receiving prison, but it was
helpful to provide further information relevant to HMP Shotts. They were also
provided with a Health and Safety Policy and an SPS booklet.  The Checklist
identified communication barriers, which allowed officers to tailor their delivery to suit
the person’s needs.  It was signed by the prisoner and the residential officer, assured
by an FLM and sent to the induction officer within 48 hours, to help form the basis of
the prisoner’s induction into Shotts.  There was a First Night in Custody Protocol
available to staff to ensure consistency in the process. 
Prisoners spoken to were content that they were provided with enough of an
understanding of how the prison ran during the admissions process. 
1.3 Statutory procedures for identification and registration of prisoners are
fully complied with. 
Rating:  Satisfactory performance 
The admissions process SOPs covered the identification and registration of
prisoners, and reception staff were observed to complete the process as instructed.
This included checking the Prisoner Escort Record (PER) and querying any
issues/concerns with escorting staff, completing the seven-point warrant check and
confirming the prisoner’s identity using the warrant for reference. 
The PER should identify any special needs, including risk factors and the RRA
provided a further opportunity for this. 
As reported in QI 1.1, an RRA was completed for those returning from court, which
took account of any changes of circumstances and needs that may arise as a result
of this.

Page 33

20 
PR2 was updated as appropriate and the warrant was then passed to the Criminal
Desk.  See QI 1.7 for more about this process. 
1.4 All prisoners are classified and this is recorded on the prisoner’s
electronic record. 
Rating:  Satisfactory performance 
As reported previously, HMP Shotts did not receive prisoners straight from court.
They were transferred in from another establishment, which meant that the prison
knew in advance who was arriving and on what date.  The Population Manager at
HMP Shotts managed this process, with input from the Prison Management Meeting. 
The Population Manager had built up good relationships with other establishments
and liaised with them about transfers in and out of HMP Shotts. He had various
spreadsheets in place to manage the process efficiently.  He arranged for the
necessary background checks to take place and allocated prisoners to a suitable
location in the prison before they arrived. 
A weekly email was sent to interested parties on a Friday for the week ahead,
detailing all transfers in and out of the establishment.  PR2 was updated as
appropriate. 
The exception to this was prisoners eligible for placement into the National Induction
Centre (NIC), where the NIC manager managed transfers in and out and arranged
for background checks to be completed before accepting them. 
1.5 All prisoners are allocated to a prison or to a location within a prison
dependent on their classification, gender, vulnerability, security risk or
personal medical condition. 
Rating:  Satisfactory performance 
As reported in QI 1.4, HMP Shotts were aware of prisoners due to arrive in their
establishment in advance.  Other establishments contacted the Population Manager
at HMP Shotts with requests to transfer prisoners to them, and HMP Barlinnie issued
a weekly list of long-term prisoners (LTPs) waiting to transfer to a long-term
establishment. 
The Population Manager used a database and spreadsheet to manage this process.
He arranged for the necessary checks to be completed, allocated them a location in
the prison before they arrived, and informed reception staff where the prisoner
should be located. 
If a prisoner with accessibility needs was on the list to transfer in, they would not be
taken unless there was an accessible room available for them. The Population
Manager could not recall this ever having been an issue.

Page 34

21 
The NIC manager managed this process for those being placed in the NIC.  Eligible
prisoners were interviewed and must agree to participate in the NIC regime before
being accepted. 
Prisoners who request protection were assessed prior to going on protection and
were reviewed annually. 
1.6 A cell sharing risk assessment is carried out prior to a prisoner’s
allocation to cellular accommodation. 
Rating:  N/A 
All prisoners held in HMP Shotts at the time of the inspection were placed in single
cell accommodation, therefore there was no requirement for cell sharing risk
assessments. 
1.7 Release and conditional release eligibility dates are calculated correctly
and communicated to the prisoner without delay. 
Rating:  Satisfactory performance 
The staff on the Criminal Desk within HMP Shotts were responsible for the
calculation of release dates, therefore all warrants were passed to them by
reception. Because HMP Shotts did not receive prisoners directly from court, they
did not provide those arriving with release dates as they would already know them.
However, the Criminal Desk rechecked the calculation to be confident that the dates
were correct for those in their care. 
If a prisoner attended court whilst in custody and the outcome affected their release
date, reception notified the Criminal Desk and passed the warrant to them.  The
Criminal Desk recalculated their release dates and updated PR2 within 24 hours.
There was an assurance process in place whereby the manager checked and signed
off the calculation and confirmed the date on PR2.  A critical dates template was then
sent to the prisoner to inform them of their new dates and an email was issued to
relevant staff attaching the warrant and sentence calculation.  If their dates were not
affected following a court appearance, the criminal desk emailed staff to inform them
of any additional charges and confirmed no change to their release dates. 
Staff confirmed that there were good relationships in place with the Crown Office and
Procurator Fiscal Service (COPFS) should they need to query anything on the
warrant. 
To date there had been no detainee or liberations in error at HMP Shotts. 
There were two members of staff working on the Criminal Desk.  Both were
competent in warrant identification and calculation and they covered for each other
during leave periods. 
The processes in place were efficient and there was a suitable assurance process in
place. All paperwork was stored and destroyed appropriately.

Page 35

22 
1.8 All prisoners attend an induction session as soon as practicable, but no
later than one week after arrival, which provides a thorough explanation of
how the prison operates and what the prisoners can expect, including their
rights and obligations. 
Rating: Generally Acceptable performance 
HMP Shotts received a low number of new admissions, and during the pandemic this
was further reduced. Prisoners arriving had already completed national induction at
their previous establishment. 
The Links Centre Officer was responsible for delivering induction to new admissions
and was clearly enthusiastic about her role.  She was notified of new admissions via
the First Night Admissions Checklist sent to her from residential hall.  She proactively
arranged to meet with every new admission to encourage them to attend induction,
and to find out their background and identify any communication needs so that she
could tailor the presentation to suit.  It was delivered on a one to one basis or
occasionally in small groups.  Translation services were used for foreign nationals as
required and had recently been used to communicate with a Vietnamese prisoner.
The National Induction Programme (NIP) was used as the basis for the induction and
text was added to provide information pertinent to HMP Shotts. Inspectors noted
that the NIP did not cover (PIAC), which is an important vehicle for prisoners to have
their say and influence decisions that affect their life.  HMP Shotts updated their
presentation during the inspection.  HMIPS ask that Scottish Prison Service
Headquarters (SPS HQ) update the presentation to include this. 
Inspectors observed delivery of the NIP to a new admission who had not been to
prison before.  It was very clearly delivered, in a supportive but professional style,
and tailored to suit the individual.  It provided a thorough explanation of how the
prison operated. Prisoners spoken to were positive about the information provided
to them during induction. 
Those that did not wish to attend induction were provided with an NIP booklet, which
was available in nine other languages, braille and BSL, and non-attendance was
recorded on Prison Records System (PR2). No follow-up action was taken, but
inspectors were not overly concerned as they would have received induction before
arriving at HMP Shotts.  Inspectors noted that the induction booklet was out of date,
e.g. it talked about smoking in cells which was no longer permitted and referred to
Visiting Committees. SPS HQ should take action to update the booklet and reissue
it to prisons. 
Induction was delivered as quickly as possible but not always within seven days.
This was because the Links Centre Officer was a singleton post and the officer had
other duties to attend to.  There was also no cover when the officer was absent.
Inspectors were not overly concerned about this because new admissions would
have received the NIP before arriving at HMP Shotts.  They were also given the
Admissions Information Pack in reception and taken through the First Night
Admissions Checklist on arrival at their residential hall.  However, HMP Shotts
should aim to deliver an induction to all new admissions within the agreed seven
days.

Page 36

23 
HMIPS were pleased to hear that HMP Shotts issue a Family Information Awareness
Package to families and friends of prisoners, along with the offer of a face-to-face
Family Induction that had been delivered in both the prison and in the community.
This is considered good practice. 
Recommendation 1: SPS HQ should take action to update the NIP and
booklet to ensure it provides up to date information to prisoners. 
Recommendation 2: HMP Shotts should arrange cover for the Links Centre
Officer when they are absent. 
Good practice 1: HMP Shotts issue a Family Information Awareness Package
to families and friends of prisoners. 
1.9 The procedures for the release of prisoners are implemented effectively
with provision for assistance and basic practical arrangements in place. 
Rating:  Satisfactory performance 
Standard 7 will report on how the release process proactively facilitates the prisoners
transition back into the community. 
For those being liberated, the Parole Board for Scotland sent the license conditions
to the Criminal Desk. All paperwork was then sent to the relevant Unit Manager to
sign off and they met with the prisoner one or two days in advance of their release to
talk them through their license conditions and provide them with a copy.  The
Criminal Desk sent out a liberation list mid-way through the month for the following
month, so that all relevant staff had a few weeks’ notice of prisoners due for release.
Prior to release, the Links Centre Officer offered support to prisoners with benefit
entitlements including community care grants, assisted them to make an application
for a basic bank account and a citizen card photographic ID.  She also offered advice
about transport to their destination and location of GP surgeries. 
On their date of release, prisoners attended the prisoner reception area where they
were reminded of their license conditions.  All personal property and money stored
on their behalf was returned to them and signed for, with the exception of their
mobile phone that was returned to them at the front of house before leaving the
establishment. They were offered holdalls to place their property in which provided
them with privacy on release.  Every effort was made to coincide their release time
with transport links and appointments made in the community, and inspectors
witnessed this happening.  For those that required it, Naloxone was placed in their
property by healthcare staff in advance of their release date.  If required, prisoners
being liberated were offered a travel warrant to provide them with a means to reach
their destination. Stocks of appropriate clothing were held in reception should
prisoners require it.  Prisoners were also invited to participate in an exit interview to
allow the prison to review their experience of HMP Shotts.  They were then escorted
to the front of house reception area where their details were checked again and they
were permitted to leave the establishment.

Page 37

24 
Inspectors were able to observe two liberations during the inspection, and followed
them on their journey, from being brought to the prison reception area from their
residential hall to being released through the front of house reception.  The process
ran smoothly and staff dealt with the prisoners really well, providing reassurance for
those who were nervous about being released. 
The Criminal Desk sent a notification to interested parties, such as Police Scotland
to inform them that a prisoner had been liberated and attached their licence
conditions. 
An SOP was available to staff to cover the release process.

Page 38

25 
STANDARD 2 - DECENCY 
The prison supplies the basic requirements of decent life to the prisoners. 
The prison provides to all prisoners the basic physical requirements for a
decent life.  All buildings, rooms, outdoor spaces and activity areas are of
adequate size, well maintained, appropriately furnished, clean and hygienic.
Each prisoner has a bed, bedding and suitable clothing, has good access to
toilets and washing facilities, is provided with necessary toiletries and
cleaning materials and is properly fed.  These needs are met in ways that
promote each prisoner’s sense of personal and cultural identity and
self-respect.
Inspection Findings
Overall Rating:  Generally acceptable performance 
In this standard, four quality indicators were rated as satisfactory, one was rated as
generally acceptable and one was rated as poor, giving an overall rating of generally
acceptable performance. There was one example of good practice, and
eight recommendations for improvement. 
HMP Shotts was built in 2012 with all cells being single occupancy. The original
operational capacity was 553 but was increased to assist with population issues
during COVID-19. The four accessible cells were of a good size and practical
construction, containing the necessary equipment and mobility aids for the
occupants. 
The prison buildings were found to be in good condition, fit-for-purpose, and to have
good levels of cleanliness. All areas had cleaning schedules and each residential
area had at least one prisoner trained in dealing with biohazard incidents.
Although biohazard kits were available, the contents varied in every hall and the
majority of staff were not aware that an up-to-date ‘grab box’ was available for use. 
The standard of prisoners bedding, mattresses etc. was of an appropriate quality in
most cases with the majority of prisoners having their own personal bedding. The
prison laundry worked well with efficient processes in place, however It was noted a
need for an improved method around the securing of laundry bags to prevent loss or
damage. 
Prisoners were given free access to essential toiletries on the halls, with adequate
items in stock. In addition, the prison canteen offered a good range of toiletries to
suit all budgets. 
Although Inspectors were informed that there had not been a PIAC in respect of the
canteen since February 2020 due to COVID-19 restrictions, they were plans in place
to restart them at the end of June 2022, giving prisoners the opportunity to influence
the items available for them to purchase.

Page 39

26 
Prison issued clothing was held in a store room located on each residential area and
found to be well stocked. HMIPS found that prisoners knew the process in respect of
requesting clothing and would receive it with little or no delay. 
Prisoners ordered their meals through the new Kiosk system, which clearly displayed
nutritional information and allergens contained in all choices. However, updates to
the Kiosk were required to make the process run more smoothly. 
A process was in place to cater for those that required a special diet and inspectors
were pleased to see a varied bespoke menu in place for one prisoner with health
issues. Overall cleanliness of the pantries was good, but there was room for
improvement with regards to dealing with waste food products from the previous
day’s meals. Although issues around the corrosion of microwave ovens were
highlighted in an internal audit in February this year, this had yet to be addressed. 
A significant number of prisoners (75%) expressed dissatisfaction with the overall
quality of food in HMP Shotts, with most stating that it was ‘soggy’ or ‘stodgy’. Having
observed the food trolleys, which were loaded and sent to the halls as close to meal
time as possible, there still seems to be an issue with the quality which could be
related to the type of trolley being used. We encourage HMP Shotts to review their
trolleys and look at those in HMP Low Moss, where the food trolleys were found to
have less detriment on the condition of food arriving at the halls. 
Food was not always temperature checked at the point of service and very few
prisoners serving food wore the appropriate PPE. Only one area was observed
securing the pantry door to prevent unwarranted access during meal service.  In
multiple locations some items were placed on a dining table where self-service
appeared to be the norm. This was concerning for potential cross contamination as
well as portion control. 
Training records were reviewed and showed that only 77% of prisoners working in
the Catering Department had completed the required Food Hygiene certification, with
only 50% of prisoners trained. 
In terms of the PANEL principles for this standard: 
Participation:  PIACs in respect of the canteen had not been held since
February 2020, it was encouraging to see that they were scheduled to start
again in June 2022 but this was not met at the time of the inspection. 
Staff and prisoners were aware of how to raise maintenance issues and they
were generally dealt with promptly, replacement clothing, bedding, towels and
toiletries were readily available on request and in good supply. 
Accountability:  There were a number of checks and assurances within this
standard including mattresses being replaced on request and each hall being
allocated three new mattresses a month with a rotational change every
three years to ensure they were fit-for-purpose. A process was in place for
access to the laundry by all prisoners three times a week and for the supply
and replacement of clothing.

Page 40

27 
There was a good maintenance and prevention programme in place through
the “Agility” platform to ensure issues were prioritised and dealt with efficiently. 
Non-discrimination and equality:  Inspectors did not witness any direct
discrimination during the inspection. 
Empowerment: Prisoners had access to the basic requirements for a decent
life and understood the process for raising maintenance issues, obtaining
clothing and essential hygiene items.  Prisoners were permitted to wear their
own personal clothing whilst in the halls. 
Legality: Inspectors did not find anything during the inspection of this standard
that compromised any domestic or international laws. 
Encouraging observations 
 The size and layout of the accessible cells.
 The planned return of PIACs for the prisoner canteen process.
 Cleanliness and general condition of the prison.
 Maintenance programme had a low number of outstanding jobs and the majority
were dealt with within the allocated timescales. 
Emerging concerns 
 The high proportion of prisoners who complained about the food quality
 The solution for securing prisoners laundry bags was to tie a sock around the
neck of the bag so it can be identified by the prisoner alone, this process was
explained as part of the induction process and is far from professional.
Numbered ties should be considered as a secure way of identifying property in
the laundry.
 Biohazard ‘grab kits’ require to be monitored and maintained on each hall.
 All prisoners involved in food production or service should be appropriately
trained to carry out these duties.
 All prisoners serving food should be wearing the appropriate PPE.
 All areas should be checking food temperatures and recording it appropriately.
 The prison should adhere to point of service processes to ensure that all food is
served in conditions that comply with all Food Hygiene requirements.
 All equipment with signs of corrosion should be replaced.
 There is a need to review the delivery equipment from the Catering Department
to Halls to deliver a better quality product at point of service.

Page 41

28 
Quality Indicators 
2.1 The prison buildings, accommodation and facilities are fit-for-purpose
and maintained to an appropriate standard. 
Rating:  Satisfactory performance 
The general feel around the prison was of a clean and well maintained establishment
with buildings that were fit-for-purpose. There was no evidence of structural issues,
graffiti or walls requiring painting or repair; the paintwork throughout the prison was
fresh and well maintained. A good process was in place on each level within both
halls for painting, with equipment held within each hall and paint sourced through the
maintenance team. Prisoners could easily request their cell to be painted and this
was facilitated by the nominated prisoner painting party within that hall.  This process
worked well. 
Inspectors looked at the four accessible cells within the prison and sought the views
of three of the occupants. The cells were a good size with large glass fronted wet
rooms containing all of the necessary equipment and access handles for those with
mobility issues to comfortably use.  Occupants confirmed the cell facilities met their
requirements and that staff were attentive to their needs. All of the accessible cells
were found to be clean and fresh.  A safer cell was located on the ground floor of
Allanton and Lamont halls.  Both were not in use at the time of the inspection, but
were very clean and contained the basic necessary equipment with the beds
consisting of a mattress located on a concrete plinth.  It was noted that the safer cell
in Allanton had just been painted. 
All cells were fitted with adequate sanitation facilities and the intercom call points
were found to be in good working order.  The maintenance process worked well
within the prison, prisoners were aware that they reported a fault to staff who then
created a job request to the maintenance team via the “Agility” system.  The job was
given a priority rating and progressed, prisoners reported to inspectors that they
received a good service and repairs were carried out in good time. Prisoners and
staff were clear on how to report maintenance issues and were very complimentary
about the effectiveness of the estates team. 
The maintenance programme was viewed and at the time of inspection had a 91.6%
completion rate with only 6.72% jobs outstanding, this equated to five jobs and the
inspectors found that all were delayed for good reason such as awaiting parts or
specialist involvement. 
The prison maintenance team had three larger projects running at the time of the
inspection, the fitting of LED lighting throughout the prison, the fitting of a macerator
machine in the waste system and an upgrade to the hot water system.

Page 42

29 
2.2 Good levels of cleanliness and hygiene are observed throughout the
prison and procedures for the prevention and control of infection are followed.
Cleaning materials and adequate time are available to all prisoners to maintain
their personal living area to a clean and hygienic standard. 
Rating:  Satisfactory performance 
The prison was found to have very good levels of cleanliness throughout and
cleaning schedules for the prison in general and residential halls were in place. The
industrial cleaning team were responsible for cleaning most areas of the prison. This
team was considerably smaller than it was pre-COVID-19, but the quality of the staff
was high.  Hall pass men were responsible for cleaning the residential areas.
Prisoners were encouraged to keep their cells tidy and those that were unable, were
assisted by hall pass men. 
Relevant training records were kept by the prison including prisoner’s biohazard and
British Institute of Cleaning Sciences (BICS) qualifications, and there were sufficient
cleaning materials held on the halls. 
The industrial cleaning staff were responsible for the training of hall pass men, the
green pass cleaners for specific areas in the prison and those from the work party.
Prisoners spoken to confirmed that they had received relevant training and were
confident in their work. 
Each hall had at least one pass man trained in dealing with biohazard incidents.
Inspectors requested to view the cleaning process and found that the contents of the
biohazard kits varied in every hall. When requested, the majority of staff produced
an outdated kit and were not aware that an up-to-date grab box was available for
use. However, when these grab boxes were inspected some were found to be
missing essential content. 
Recommendation 3: Biohazard kits throughout the prison should be refreshed
and communication improved to make staff and prisoners aware of availability
and access for use. 
2.3 All prisoners have a bed, mattress and pillow which are in good
condition, as well as sufficient bedding issued by the prison or supplied by the
prisoner. The bedding is also in good condition, clean and laundered
frequently. 
Rating: Generally acceptable performance 
A number of prisoners beds, mattresses and bedding were inspected and found to
be in good condition. Some prisoners reported that the mattresses were too thin but
they had the ability to request a replacement mattress at any time. Their name
would be placed on a list and each hall was allocated three mattresses a month to
distribute. If a prisoner required a mattress in an emergency one would be provided.
Inspectors were informed that a three-year mattress replacement programme was
underway.

Page 43

30 
The prison laundry worked well with efficient processes in place. The laundry work
party consisted of 24 prisoners pre-COVID-19 but was operating adequately at the
time of inspection with a team of six.  Laundry staff reported that the washing
machines were over 10 years old and starting to show their age but a replacement
programme was anticipated to be starting soon. 
Induction training was provided by staff working in the laundry and a workshop
training record was kept. 
Work wear, personal clothing and bedding can all be washed at the laundry.
Prisoners put items in a net bag and place them in a large container on each hall for
collection three times a week.  It was noted by inspectors that the net bags were
sealed by tying a sock around the neck, and prisoners reported that they recovered
their laundry by identifying their bag by the sock.  There was no fixed process in
place for recovering lost laundry items, prisoners were advised in the information
packs provided during the admission process that items placed in the laundry system
were done so at their own risk. 
A small number of prisoners complained to inspectors that laundry bags often went
missing. Laundry staff were not aware of this being an issue and a check of prison
systems showed that there had been no complaints made regarding laundry over the
preceding six months. 
Recommendation 4: Numbered ties for securing laundry bags should be
provided so prisoners property can be identified. 
2.4 A range of toiletries and personal hygiene materials are available to all
prisoners to allow them to maintain their sense of personal identity and
self-respect.  All prisoners also have access to washing and toileting facilities
that are either freely available to them or readily available on request. 
Rating:  Satisfactory performance 
Prisoners were given free access to essential toiletries on the halls and inspectors
found adequate items in stock on all residential areas.  In addition, the prison
canteen offered a good range of toiletries to suit all budgets. 
Inspectors were informed that there had not been a PIAC in respect of the canteen
since February 2020 due to COVID-19 restrictions. Inspectors were pleased to hear
that a PIAC was scheduled for the end of June 2022 and prisoners would be given
the opportunity to influence the items available to them. 
All cells within HMP Shotts had showers and toilets therefore prisoners were free to
use them whenever they pleased. The washing facilities in the accessible rooms
were excellent with plenty of space and access points. The proposed upgrade of the
hot water system will ensure the continued provision of sufficient washing facilities in
the future. 
There was a sufficient stock of towels that were in good condition and laundered
regularly.

Page 44

31 
2.5 All prisoners have supplied to them or are able to obtain for themselves
a range of clothing suitable for the activities they undertake.  The clothes
available to them are in good condition and allow them to maintain a sense of
personal identity and self-respect.  Clothing can be regularly laundered. 
Rating:  Satisfactory performance 
All prison issued clothing was held in the store room located on each hall.
Inspectors found sufficient stocks of clothing in all sizes in all halls, and there was a
combination of new and recycled clothing available with additional stock held in the
laundry.  Prisoners reported that they knew the process in respect of requesting
clothing and receive it with little or no delay. 
It was noted that jeans were limited in number on some halls and staff explained that
this was due to the supply being suspended due to COVID-19 restrictions. It was
found that demand for jeans had, however, dropped therefore any shortage was not
proving to be an issue. It may be that the current rule of prisoners not being required
to wear jeans during visits is a contributory factor and this may change should this
rule be revoked in the future. 
Outdoor jackets were of high visibility and good quality, with prisoners reporting they
were fit-for-purpose. There were adequate jackets in stock and available if required. 
Prisoners were permitted to wear their own clothing in residential areas to allow them
to maintain a sense of personal identity. 
See QI 2.3 in respect of information about the laundry. 
2.6 The meals served to prisoners are nutritionally sufficient, well balanced,
varied, served at the appropriate temperature and well presented.  Meals also
conform to their dietary needs, cultural or religious norms. 
Rating: Poor 
The meals provided were on a three-week set menu cycle.  Meals were ordered
through the new Kiosk system, which clearly displayed nutritional information and
allergens contained in all choices.  However, any special dietary needs were ordered
separately and tracked by the catering staff, due to the Kiosk system requiring
further updates.  Additionally, prisoners reported some issues in regards to
re-ordering when the same choice(s) was wanted in future weeks.  It was also
reported by catering staff that amendments to the menu were not possible until the
system was fully updated. 
Catering staff identified several groups of prisoner who were following cultural or
religious dietary requirements.  However, one prisoner with significant health
concerns required more substantial adjustment, and as such, a bespoke menu which
retained variety and met their nutritional needs had been created for them.  This was
seen as good practice, being able to resource and accommodate a tailored service
for those who needed, whilst achieving a high volume output service function that
was key to the establishment.

Page 45

32 
Overall cleanliness of the pantries was generally good.  However, both sections of
Lamont Level 1 and 2 could be improved.  These areas consistently showed signs of
waste food products from the previous day’s meals. Additionally, whilst checking
equipment a significant number of microwave ovens were found to be corroded, with
the potential for flaking debris to contaminate food during cooking. Disappointingly, it
appeared that this was identified during internal auditing in February this year, but
had not yet been addressed. The internal audit appeared to have been very robust
and identified a number of issues which remained as actions still requiring to be
addressed. 
A significant number of prisoners expressed dissatisfaction with the overall quality of
food in HMP Shotts, with most stating that it was ‘soggy’ or ‘stodgy’.  The food
trolleys were witnessed being loaded and sent to the halls as close to meal time as
possible, and there was equipment within the pantry areas (air fryers) to re-fresh
some products but, on such a scale this would seem impractical.  The food trolleys
appeared to be common to other establishments with the exception of HMP Low
Moss, where the food trolleys more effectively maintain the condition of food arriving
at the halls. 
Point of service for meals appeared a little less consistent across the establishment.
Although some areas appeared to be carrying out temperature checks at the point of
service this was not witnessed in all areas.  Additionally, very few prisoners serving
food were observed wearing the appropriate PPE.  Only one area was observed
securing the pantry door to prevent unwarranted access during meal service.
Indeed, on a number of occasions and locations, the pantries were found to have
numerous prisoners preparing their own food whilst service was on-going; and on
more than one occasion servers were observed eating whilst serving.  In multiple
locations some items, such as soup, custard and salad were placed on a dining table
where self-service appeared to be the norm. This was concerning for potential cross
contamination as well as portion control (a prisoner was observed moving between
sections because custard had run out in their section). 
Training records were reviewed and showed that only 77% of prisoners working in
the Catering Department had completed the required Food Hygiene certification.  Of
those prisoners listed for pantry duties, this was found to be slightly less than 50%
trained in Food Hygiene, which may be reflective of their awareness to wearing PPE
and not eat whilst serving food.  Indeed, catering supplies were checked and there
appeared to be an abundance of PPE available.  Catering staff absence had
affected, and remained an issue for the Catering Department and requisite training. 
Good Practice 2:  Catering staff provide consultation and provision for those
with additional dietary necessities. 
Recommendation 5: HMP Shotts should ensure Kiosk updates are completed
timeously to prevent frustrations with the ordering of special diets. 
Recommendation 6: HMP Shotts should ensure all prisoners involved in food
production or service are appropriately trained to carry out these duties.

Page 46

33 
Recommendation 7: HMP Shotts should ensure that all food is served by the
appropriate person who must always be wearing appropriate PPE in conditions
that comply with all Food Hygiene requirements. HMP Shotts should also
ensure consistent checking and recording of food temperatures. 
Recommendation 8: HMP Shotts should replace all equipment which has
signs of corrosion, or equipment which is known to be faulty. 
Recommendation 9: HMP Shotts should implement the required actions from
previous catering audit in February 22, and re-audit to measure compliance. 
Recommendation 10: HMP Shotts should review their delivery equipment
from the Catering Department to Halls to ascertain if improved heat holding can
be achieved, and subsequently deliver a better quality product at point of
service.

Page 47

34 
STANDARD 3 - PERSONAL SAFETY 
The prison takes all reasonable steps to ensure the safety of all prisoners. 
All appropriate steps are taken to minimise the levels of harm to which
prisoners are exposed.  Appropriate steps are taken to protect prisoners from
harm from others or themselves. Where violence or accidents do occur, the
circumstances are thoroughly investigated, and appropriate management
action taken. 
Inspection Findings 
Overall Rating:  Generally acceptable Performance 
In this standard, one quality indicator was rated as good, two were rated as
satisfactory, and four were rated as generally acceptable performance giving an
overall rating of generally acceptable performance. There were four examples of
good practice and 10 recommendations for improvement. 
The prison had largely emerged from the limitations and consequences of
COVID-19, and it felt safe and ordered. 
Prisoners managed under Talk To Me (TTM) were managed with care, compassion
and understanding.  TTM case files checked had some gaps in relation to completion
and HMP Shotts should continue to take action to improve this. 
In relation to taking care of prisoners whose appearance, behaviour or background
left them at heightened risk of harm, the positive impact the introduction of
photocopying of prisoners’ mail had in mitigating the risk of illicit substances being
introduced to the prison was acceptable. The experiences of staff in 2021 in
managing those under MORS appeared to be such that the staff placed even greater
value on the 40% reduction pro rata in cases so far in 2022. 
A multi-disciplinary approach was being applied to support those at heightened risk
of harm due to mental health and/or substance misuse.  Residential staff were able
to identify and signpost to appropriate stakeholders and there were opportunities for
prisoners to self-refer to available health improvement activities. 
A prisoner information channel (PIC) was a major feature of Fife College’s
contribution to health improvement activities, in collaboration with various internal
and external partners. 
Custody Adjustment Support and Transition (CAST) Pathway within the NIC had at
its foundations, residential staff and Physical Education Instructor (PEI) based
delivery of induction, accredited START programme and other training courses with
input from Fife College, the Health Improvement Practitioner and other stakeholders. 
.

Page 48

35 
Procedures in support of violence reduction strategy were evident across the
establishment. However, it was noted that the SPS Anti-Bullying Strategy ‘Think
Twice’ required to be re-invigorated. 
There was a fully equipped C&R store and a well organised Command Room,
supported by comprehensive contingency plans.  COVID-19 had affected
competencies, with the suspension of training with only 20 of the required 31 C&R
trainers in post. Worryingly, in common with other establishment, there was a lack of
any desktop or live exercise within the past 12 months, with the last Local Incident
Management (LIM) exercise pre-dating COVID-19. 
The Health & Safety Management system in place was found to be compliant,
managed by two qualified part-time Health & Safety Managers responsible for
providing competent advice.  However, fire evacuation drills should re-commence as
soon as reasonably practicable, supported by briefings where necessary to ensure
staff are proficient in procedures. 
In terms of the PANEL principles for this standard: 
Participation. TTM practices were person-centred. Individuals were
encouraged to participate in case conferences and staff/prisoner relationships
appeared good and supportive. There were opportunities for positive
engagement by those otherwise at risk of harm or abuse from others through
self-referral, multi-disciplinary meeting or by embracing the health improvement
activities offered. 
Accountability. Compliance processes for assuring essential procedures in
caring for those at risk of suicide or self-harm including the SPS Suicide
Strategy - TTM, Management of an Offender suspected to be at Risk due to the
ingestion of a Substance (MORS) and Notification of Concern (NOC) were
highly efficient and well managed. The TTM system was well established and
there was a robust assurance process was in place that reported monthly to
SPS headquarters.  Documentation was completed to a high standard and any
slippages were identified and actioned through the assurance process. 
As COVID-19 restrictions reduced, there had been monthly Multi-disciplinary
Team meetings. Meetings were well attended, and minutes demonstrate they
were prisoner focussed.  It was noted that the SPS Anti-bullying Strategy ‘Think
Twice’ required to be re-invigorated. 
Non-discrimination and equality.  Although the establishment demonstrated
a positive approach to equality, the recently planned Equality & Diversity
meeting had not taken place and should be convened at the earliest
opportunity. 
Empowerment. Most of the prisoners reported feeling safe and the prison was
well ordered with staff demonstrating control.  Prisoners provided feedback that
the information on prisoner information channel (PIC) had been useful quoting
the use of breathing exercises. There was evidence of prisoners reporting
being bullied and the perpetrators challenged.

Page 49

36 
Legality.  The application of the Prisons and Young Offenders (Scotland) Rules
appeared legitimate at the time of inspection, with no evidence found of any
non-compliance in terms of procedures observed and checked. The Health &
Safety Management System was mature and provided a good basis for culture. 
Encouraging observations 
 Compliance processes assuring essential procedures in caring for those at risk
of suicide or self-harm including TTM, MORS and NOC were highly efficient and
well managed.
 Health Promoting Friday incorporating ‘Neil’s hugs foundation’, ‘library man
group’ and ‘trauma (NHS information session), etc., in collaboration between Fife
College, SPS and NHS Mental Health Team, Health Improvement Practitioner
and Addictions Caseworker and North Lanarkshire Council.  Open to
mainstream and protection prisoners (full parity).
 Prisoner Information Channel. Podcasts from positive peers, Enhanced
Addictions Caseworker, NHS advertisements, mental health support, meditation,
self-help, music requests, etc.
 Fife College. Use of Library in mental health provision. “Education and
conversation in Art classes”, work with men with speech and language
communication deficits, low literacy learners and dyslexia friendly learning.
 Residential Officer and Physical Education Instructor based delivery of Custody
Adjustment Support and Transition (CAST) Pathway within the National
Integration Centre (NIC) incorporating induction, training courses and case
conferencing with input from Fife College, Health Improvement Practitioner and
other stakeholders.
 Management of Health & Safety across Prisoner Employment and Training
department including risk assessment, safe systems of work and training
arrangements. 
Emerging concerns 
 SPS HQ should reinstate Psychological input into CAST Pathway case
conferencing within the NIC.
 There should be improved administration around completion of TTM case files.
 A regular review of violence reduction should be reintroduced.
 All VIR forms following a Violent Incident Review Panel should be taken to the
Violence Reduction Group meeting for consideration as required by the strategy
document.
 The SPS Anti-bullying Strategy ‘Think Twice’ should be re-launched with
information and training provided as only 40% of staff had been trained since
July 2021
 Posters require to be replenished across the establishment in relation to on the
‘Think Twice’ and violence reduction.
 Staff were not always clear on processes to follow after a staff alarm and should
be reminded of correct protocols
 Conduct a review of incident command role holders to ensure adequate cover for
the establishment, and that role holders are competent.

Page 50

37 
 Contingency exercise arrangements to be reviewed. There had not been any
Contingency exercise arrangements within past 12 months with the last Local
Incident Management (LIM) exercise pre-COVID-19.
 Fire evacuation drills should re-commence as soon as reasonably practicable
supported by briefings where necessary to ensure staff are proficient in
procedures.
 Due to the length of time since the last Noise Assessment taking place, this
should be reviewed in line with policy by a competent person.

Page 51

38 
Quality Indicators 
3.1 The prison implements thorough and compassionate practices to
identify and care for those at risk of suicide or self-harm. 
Rating:  Generally acceptable performance 
Prisoners managed under the SPS TTM Strategy in HMP Shotts were managed with
care, compassion and understanding. 
Information shared between the NHS and the SPS at case conferences was
appropriate and justified in terms of respecting confidentiality, whilst managing the
individual’s risk of suicide and self-harm.  In an observed case conference, it was
noted that the prisoner was only given access to the case file ten minutes before the
conference, resulting in frequent objections to some of the information recorded in
the case file. 
The residential First Line Manager (FLM) who chaired a case conference was not a
regular SRU FLM. Whilst a residential officer was present, it was apparent that the
Chair lacked direct knowledge of the prisoner which could affect the ability to assess
risk and any changes needed to the care plan. 
One individual had been managed on TTM for an extended period of time. An
attempt to remove the individual from TTM and manage him under the SPS self-
harm policy some time ago had been unsuccessful, but it was encouraging to see
arrangements being made for a multi-disciplinary meeting to consider options again. 
Compliance processes were highly efficient and well managed in assuring essential
procedures in caring for those at risk of suicide or self-harm including TTM,
Management of an Offender suspected to be at Risk due to the ingestion of a
Substance (MORS), Notification of Concern (NOC) and the operational readiness of
Crash Packs (first-aid kits). 
TTM live case and reception risk assessment (RRA) audits covering the previous
three months were reviewed and most reported all being in order and no action
being required.  Some actions had been identified such as the pre-case conference
healthcare assessment taking place at the same time as the case conference and
signatures must be added. Actions had been taken to communicate and correct
these issues, however during a review of live TTM cases files the pre-healthcare risk
assessment had been recorded at the same time as the case conference.
There were also some good examples of the process working where a change of
circumstance form was completed indicating an increase of maximum contact
intervals from 60 minutes to 15 minutes. Action taken to ensure consistency with
family engagement was also evident.

Page 52

39 
Minutes from quarterly local suicide prevention meetings over the past nine months
were evidenced, and information was shared from the Suicide Prevention
Coordinator forum at SPS HQ. Safer cells were regularly used for prisoners being
managed under MORS and this was evidenced with nine safer cell checklists
reviewed between February and March 2022. The procedure surrounding
completion of a checklist prior to a safer cell being used appeared well established
and was confirmed by the assurance process. 
MORS was found to be well administered with examples reviewed; the procedure
appeared well established and assurance checks were evidenced. 
Three listeners were operating in the prison and was an appetite to increase the
number of listeners through recruitment and training irrespective of how often
listeners were being accessed by the prisoner population. 
Recommendation 11: HMP Shotts should ensure that prisoners are given the
opportunity to access information on their case file prior to the case conference. 
Recommendation 12: HMP Shotts should be proactive to encourage all
prisoners on TTM to have family engagement and continue to take action to
improve administration matters around completion of TTM case files. 
3.2 The prison takes particular care of prisoners whose appearance,
behaviour, background or circumstances leave them at a heightened risk of
harm or abuse from others. 
Rating:  Good performance 
A PEEP list was provided and the requirements of individuals spoken to confirmed
they should be on the list.  Officers demonstrated good knowledge of the individuals
and the background behind their requirements. 
It was clear that the introduction of the photocopying of prisoner’s mail had reduced
the risk of illicit substances being introduced to the prison.  In the first three months
of 2022 there were 46 occasions of prisoners being managed under MORS
compared to 312 occasions in 12 months of 2021.  This represented a 40%
reduction pro rata. 
There were two individuals who were refusing to return to main circulation. There
was good evidence of positive engagement with officers and the NHS mental health
team who were attempting to persuade them to engage with the rest of the
population. It was encouraging to attend a Prisoner Management meeting, where
they were attempting to transfer both individuals. 
Multi-disciplinary Substance Misuse Meetings started in January and took place
monthly as had Multi-disciplinary Mental Health Team Meetings. These were well
attended, purposeful and an ‘information from prison officers’ section provided
officers with the opportunity to raise concerns about individuals in an appropriate
forum, with relevant stakeholders present. Minutes of both meetings referred to

Page 53

40 
liaison with the NHS Mental Health Team, which was an obvious strength in both
meetings. 
It was clear from speaking to a range of staff that a Health Improvement Practitioner
and Enhanced Addictions Caseworkers were making significant inroads in
communicating with prisoners on both physical and mental health and addiction
services through a number of initiatives.  All opportunities to engage with the
prisoner population were being utilised including a four-week course shared as a
podcast on the prisoner information channel (PIC) with prisoners providing feedback
that they had been using the information shared such as ‘rest and repair’ breathing
exercises.  The Offender Outcomes Unit Manager further intended to introduce
‘Recovery and Support Representatives’ to assist in support of peers. 
Foreign national prisoners reported feeling safe and having their basic needs met.
Reception and Link Centre, in delivering induction procedures, demonstrated use of
global language services both via telephone and in person.  Fife College in the
Learning Centre also aided foreign national prisoners with ESOL courses. 
Fife College in collaboration with the SPS, NHS Mental Health Team, Health
Improvement Practitioner, Enhanced Addictions Caseworker and North Lanarkshire
Council.  Good examples include the NIC Custody Adjustment Support and
Transition (CAST) programme for individuals sentenced to eight years and above;
Health Promoting Friday’s incorporating ‘Neil’s hugs foundation’; ‘library man group’
and ‘trauma (NHS information session). 
Management plans were focussed on reintegrating individuals into mainstream
environments where they had earlier displayed vulnerabilities.  An excellent Lamont
Hall and NIC management plan was evidenced from December 2021, comprising
seven stages of a person-centred approach ranging from planning and engagement
with NHS, providing the individual increasing time in hall to integration and induction
following a consolidation phase allowing reflection and exploration of issues. 
Good Practice 3: Multi-disciplinary approaches in Health Promoting Friday
incorporating ‘Neil’s hugs foundation’, ‘library man group’ and ‘trauma (NHS
information session), etc. 
Good Practice 4: Prisoner Information Channel. Podcasts from positive peers,
Enhanced Addictions Caseworker, NHS advertisements, mental health support,
meditation, self-help, music requests, etc. 
Good Practice 5: Residential staff and PEI based delivery of CAST Pathway
within the NIC incorporating induction, training courses and case conferencing
with input from Fife College, Health Improvement Practitioner and other
stakeholders. 
Recommendation 13: SPS HQ to reconsider with Psychological Services,
return of psychology input into CAST Pathway case conferencing within the
NIC.

Page 54

41 
3.3 Potential risk factors are analysed, understood and acted upon to
minimise situations that are known to increase the risk of subversive,
aggressive or violent behaviour.  Additionally, staff are proactive in lowering
such risks through their behaviours, attitudes and actions. 
Rating:  Generally acceptable performance 
Violence reduction and anti-bullying posters were visible throughout the prison. The
Violence Reduction Strategy was available on the SharePoint site accessible to all
staff. 
HMP Shotts has a Violence Reduction Group (VRG) that reviews violent and serious
incidents that occur. Although well attended, the last meeting took place in
September 2021. During that meeting they reviewed the last five months’ intelligence
and incidents which highlighted a number of recoveries. Further information such as
the updates from the halls contained useful information. 
One violent incident that occurred was tracked in terms of the violence reduction
strategy flowchart.  A comprehensive Residential FLM and Duty Manager overview
had been provided on the VIR form, and a Violent Incident Review panel was
awaited. The strategy document requires the VIR to be submitted to the Intelligence
Management Unit (IMU) within 48 hours after a Violent Incident Review panel is
completed. The IMU advised this was not the case on every occasion, but it was
assuring that the IMU track and issue reminders until the Violent Incident Review
panel is completed, and form submitted. 
A very organised IMU was delivering a well-developed SPS Intelligence Framework
and action dissemination, with proactive and engaging IMU FLM and analyst staff. A
strategic threat assessment was evidenced which identified current threats to the
establishment along with regular Tactical Tasking and Co-ordination Group (TTCG)
meetings.  A prisoner profile was under development for the violent incident that had
occurred. 
Recommendation 14: The Violence Reduction Group should meet more
regularly to review violence reduction and ensure actions are taken, and the
VIR form submitted to IMU following a Violent Incident Review Panel should be
taken to the Violence Reduction Group meeting for consideration as required
by the strategy document. 
3.4 Any allegation or incident of bullying, intimidation or harassment is
taken seriously and investigated.  Any person found to be responsible for an
incident of bullying, intimidation or harassment is appropriately reprimanded
and supported in changing their behaviour. 
Rating:  Generally acceptable 
See QI 3.3 relating to the Violence Reduction Strategy that provided the prison with
a coordinated approach to reducing violence. In the absence of a Violence
Reduction Group meeting since September 2021 there is a general acceptance that

Page 55

42 
the SPS Anti-bullying Strategy ‘Think Twice’ required to be re-launched to ensure
staff were aware and knowledgeable. 
One ‘suspected bullying report (SBR) form’ from April 2022 was reviewed and
actions taken found to meet the standard’s requirements. 
Of the six violent incident report forms submitted since September 2021 relating to
prisoner-on-prisoner assault, on five of the six occasions, individuals were separated
and on two of the occasions a transfer was arranged for a perpetrator. 
An induction package ‘respect me’ along with autism awareness and disability as
well as hate crime courses were delivered within the NIC.  Consideration should be
given to rolling these packages out to the wider prison population, beyond the
dissemination that occurs as men move from the NIC to general population. 
Up until March 2020 a training programme was in place for the SPS Anti-bullying
Strategy ‘Think Twice’, with 40% of staff recorded as trained at that time.  COVID-19
had affected this. 
SPS Anti-bullying Strategy ‘Think Twice’ was included in the induction package,
which continued to be bespoke at this time as the prison emerged from COVID-19
and was covered in the induction booklet provided. 
It was encouraging to attend a Prisoner Management meeting, and see the robust
approach to prisoner need. 
Recommendation 15: SPS Anti-bullying Strategy ‘Think Twice’ requires to be
re-launched to overcome the identified deficits e.g. only 40% of the staff are
trained. Posters should be replenished across the establishment and a re-audit
of incidents should take place to ensure all incidents of bullying, intimidation or
harassment are investigated and taken seriously. 
3.5 The victims of bullying or harassment are offered support and
assistance. 
Rating:  Satisfactory performance 
A number of opportunities for prisoners to appropriately raise concerns or be
identified by staff were evidenced against QI 3.2. Similarly, good staff/prisoner
relationships were demonstrated across the establishment which created an
environment where concerns were more likely to be raised with staff. 
An example of this was observed on one hall when eye contact with a prisoner at
meal time raised suspicions with staff that something was amiss.  The officer took
the opportunity later to speak with him out of sight of other prisoners. In the NIC
inspectors observed an FLM meeting with a prisoner who was in prison for the first
time, where concerns had been raised in relation to demeanour. Whilst no concerns
were identified in relation to bullying or harassment, the FLM was able to offer him
support with the impact that missing his family was having on him.

Page 56

43 
In most occasions the perpetrator of an assault was relocated and only one occasion
the victim was moved. 
3.6 Systems are in place throughout the prison to ensure that a proportionate
and rapid response can be made to any emergency threat to safety or life.
This includes emergency means of communication and alarms, which are
regularly tested, and a set of plans for managing emergencies and
unpredictable events.  Staff are adequately trained in the roles they must adopt
according to these plans and protocols. 
Rating:  Generally acceptable performance 
SOP 202 ‘security staff alarm response’ was provided and described primary and
secondary alarm responders, that were not specifically designated. Personal alarms
carried were separate to the staff radio system. Inspectors noted that SOP 202
‘security staff alarm response’ was past its review date and should therefore be
reviewed. SOP 909 relating to medical emergencies during patrol and night shifts
was also provided, including reference to code red and code blue arrangements
along with arrangements for contacting the Scottish Ambulance Service. 
There was a fully equipped control and restraint (C&R) store in preparation for any
eventuality. The equipment store was well managed, in support of a very organised
command room and further supported by comprehensive contingency plans, log
operating system and CCTV facilities. 
Contingency plans evidenced that there were nominally sufficient number of incident
command role holders to enable HMP Shotts to deal with level two and three
incidents, and a good assurance process that checked that there was suitable
staffing in place. There was no evidence of any desktop or live contingency
exercises within the past 12 months, and the Local Incident Management (LIM)
exercise pre-dated COVID-19. 
Whilst accepting the impact of COVID-19, a review should be conducted to ensure
command role holders are adequately trained and contingency exercise
recommenced. 
HMP Shotts had recently appointed a new Staff Training Manager who was still in
the process of verifying numbers trained in role and competency relating to C&R
refresher training dates.  He reported that COVID-19 had further affected
competencies with only twenty of the required thirty-one C&R advanced trained staff
in post. 
Recommendation 16: Conduct a review of incident command role holders to
ensure consistent and adequate cover for the establishment and that role
holders are adequately trained. 
Recommendation 17: Contingency exercise arrangements to be
reinvigorated.

Page 57

44 
Recommendation 18: Rapid planning is required to ensure a full complement
of advanced C&R trained staff are in post in readiness for a proportionate and
rapid response to any emergency threat. 
3.7 The requirements of Health and Safety legislation are observed
throughout the prison. 
Rating:  Satisfactory performance 
Signed policy statements recognising management responsibility for Health & Safety
(H&S) and Fire Safety were provided.  A Risk Assessment register was available
which could be sourced in the prison SharePoint site along with an excellent suite of
risk assessments and safe systems of work (SSOW). The site could be accessed by
all staff and on reviewing some examples, regular review periods were
demonstrated. Fire risk assessments were evidenced with signatures of the
Governor in Charge and Health and Safety Manager.  Those responsible for H&S
had the required qualifications to carry out their role professionally. There had been
no Scottish Fire & Rescue Service or Health & Safety Executive activity in recent
years and no respective audit actions. 
Excellent workplace inspection records existed, which showed all departments being
inspected monthly between April 2021 and April 2022, except one department on
two separate occasions.  An assurance report was completed weekly by FLMs that
included quality of cell searches, operational readiness, checks of crash packs and
C&R equipment. It incorporated a Unit Manager check and contributed to an
assurance regime, as did completion of three PRL audits on a monthly basis, co-
ordinated by the Business Improvement Department. These scheduled programmes
created a culture of assurance and contributed to the compliance and H&S agenda
across the prison. 
H&S Committee had met of six occasion in the previous fifteen months. Whilst
minutes of two meetings held in 2022 evidenced union and senior management
attendance, it was evident that there was no FLM, residential officer or estates
manager in attendance.  The H&S Committee should consider inviting them to attend
in order to ensure appropriate consultation with all employees. 
Accident investigation procedures were in place where responsible managers were
provided 14-days to return an investigation into any reported accident. 
Evidence provided relating to fire evacuation exercise, were from 2018 and
subsequent records advised that the Governor in Charge had instructed exercises
be postponed as a result of COVID-19. No evidence of replacement activities such
as briefings or toolbox talks was provided. 
The culture of H&S was observed within the workshops as outstanding and an
example of good practice, particularly arrangements around machine safety,
signage, risk assessment and training. Work units and outside areas visited were
clean to a very high standard, role modelled by the whole team responsible for the
department.

Page 58

45 
An impressive training regime was evidenced covering a number of prisoner training
courses that included H&S manual handling, fire awareness, hand-injury awareness
and emergency response.  Safety documentation available included risk
assessments and SSOWs that had been reviewed in the past 12 months, along with
noise assessments where the hazard had been identified. Although these
assessments should have been reviewed in 2021. 
A ‘Shotts safety tracker’ was evidenced with some open actions relating to a lack of
first aiders from 2021 and an issue from 2018 relating to prisoners using bedding
they had been able to purchase/be issued, which didn’t meet rating standards in line
with the SPS Fire Safety Manual and UK fire prevention regulations. HMIPS
recommend action is taken to progress and appropriately close these actions. 
Good Practice 6: Management of H&S across the regimes department
including risk assessment, SSOW and training arrangements. 
Recommendation 19: Fire evacuation drills should re-commence as soon as
reasonably practicable, supported by briefings where necessary to ensure staff
are proficient in procedures. 
Recommendation 20: Noise Assessments should be reviewed by a
competent person.

Page 59

46 
STANDARD 4 - EFFECTIVE, COURTEOUS AND HUMANE EXERCISE OF
AUTHORITY 
The prison performs the duties both to protect the public by detaining prisoners in
custody and to respect the individual circumstances of each prisoner by maintaining
order effectively, with courtesy and humanity 
The prison ensures that the thorough implementation of security and
supervisory duties is balanced by courteous and humane treatment of
prisoners and visitors to the prison. Procedures relating to perimeter, entry
and exit security, and the personal safety, searching, supervision and
escorting of prisoners are implemented effectively.  The level of security and
supervision is not excessive. 
Inspection Findings 
Overall Rating:  Satisfactory performance 
In this standard, one quality indicator was rated as good performance, six were rated
as satisfactory performance and three were rated as generally acceptable
performance, giving an overall rating of satisfactory performance. There was one
example of good practice and six recommendations for improvement. 
HMP Shotts felt secure with regards to security both within the residential areas,
regimes buildings and around the perimeter.  There was a good suite of relevant
SOPs available to assist staff in their understanding of what was required to carry
out their role. There was also good evidence of assurance processes and risk
assessments.  HMP Shotts was still working through the consequences of the
COVID-19 restrictions, with low numbers attending work or education.  As
restrictions ease the numbers moving around the prison will increase. Staff will need
to adjust to the large movement of prisoners, particularly those who have joined
since the pandemic and have not experienced this before. A priority for HMIPS is to
encourage HMP Shotts to increase staff that are competent in Control and Restraint
(C&R) and Personal Protection Training (PPT). 
In terms of the PANEL principles for this Standard: 
Participation: It is fundamental that prisoners feel part of the process and not the
subject of it. This was evident when looking and observing reintegration or
management plans for the SRU, self-representations at discipline hearings and case
conferences, as well as case conferences relating to Special Security Measures
(SSM). Prisoners reported that they had been communicated to with regards to
decision taken about them, and were aware how and when to challenge these
decisions as seen in one discipline hearing. 
Accountability: Individualised reintegration plans were evident where discipline
hearings were observed.  Judgements and punishments were on a case to case
basis with no apparent use of a tariff system.  There were assurance systems in
place for sample cell and area searching, but this was not always completed.  There
was robust assurance in regard to vehicle and perimeter searching with good

Page 60

47 
assurance processing place.  There was a process in place to assure that C&R
removals were legitimate and lawful, however some planned removals had not been
recorded and were not mitigated by the Head of Operations. 
Non-discrimination and equality: There was no evidence of any discrimination
against prisoners. There was no evidence of targeting of particular prisoner cohorts
either in searching or drug testing.  It was pleasing to see the care taken with those
that were most at risk to ensure that their rights were upheld and that measures,
such as those reported in QI 4.4, were only in place for the minimum amount of time. 
Empowerment: Discipline hearings and case conferences supported prisoners in
allowing them to understand the actions taken against them.  There was time taken
to explain decisions and the actions prisoners could take if dissatisfied with any
outcomes.  Inspectors found that generally prisoners understood why they were
being managed in a certain way, and what was expected of them to turn their
situations around, particular when being managed under rule 95 
Legality: For this standard it was clear that prisoners held under various rules or
procedures were done so lawfully.  With regards to the possession of illegal items,
the prison was proactive in restricting the introduction of these items both through
the vehicle lock and the perimeter.  Although there is a caveat of COVID-19 and the
importance of social distancing, it was found that in some cases staff involved in a
C&R removal were past their refresher dates.  However, the removals were carried
out as per C&R guidelines. 
Encouraging observations 
 The areas around the perimeter were clear of rubbish, maximising the
opportunity to recover illicit items thrown over the perimeter. 
Emerging concerns 
 HMP Shotts should look to increasing the C&R competency of their staff to the
accepted level as a priority.
 HMP Shotts must ensure that all planned removals are recorded unless there
is reasonable mitigation
 The Prison Monitoring and Assurance Group (PMAG) should intervene and
take the decision as to where a prisoner should move to when it is clear that
prisoner cannot be reintegrated into the holding prison.
 HMP Shotts should ensure that all cells are searched at least once per quarter
and consider carrying them out at different times.

Page 61

48 
Quality Indicators 
4.1 Force or physical restraints are only used when necessary and strictly in
accordance with the law. 
Rating: Generally acceptable performance. 
Force or physical restraint, known as Use of Force (UOF) must be undertaken in
accordance with Rule 91 of the Prisons and Young Offenders Institutions (Scotland)
Rules 2011. 
UOF did not appear to be overused. All were checked by the Head of Operations to
ensure compliance, with an initial check carried out by the IMU.  Any trends or
hotspots where UOF had been used were then highlighted to the Tactical Tasking
and Coordination Group for any action. 
Staff were guided by a UOF SOP as well as an SOP regarding the video recording of
removals, a requirement when the removal is planned. Both SOPs were accessible
via the local SharePoint site. 
The IMU kept a database of all removals, along with any video footage linked to
planned removals and it was retained for the required three-year period. The
camera used to record UOF was stored in an area easily accessible by an FLM. Ten
UOF were checked from the last 12 months. The report writing was of a good
standard and highlighted any issues staff experienced, when change overs occurred
and the reasons as well as where staff were replaced to uphold the guidelines about
searching. On three occasions when the UOF was planned, there was no footage
available and no mitigation offered. 
On a number of occasions nurses were not available to assess the prisoner once the
removal was completed. This was either due to the time of the removal i.e. after
18:00 when there were no NHS staff in the prison, or due to NHS staff shortages.
However, there was evidence that C&R removals had been recorded when checking
the IMU data base. An inspector also viewed a live removal from the Electronic
Control Room (ECR). It was clear that it was managed well with the removal being
recorded. 
Under SPS PRL 2.3.4.2: Control & Restraint, only prison staff assessed as
competent to do so took part in C&R removals.  A concern for HMIPS was the level
of staff competence in C&R.  Staffed trained in C&R phase one was at 53% with
C&R phase 2 at 86%, and those required to be competent in PPT was at 16%. Staff
involved in UOF were checked against staff training records. Two FLMs supervising
a removal and seven staff who took part in a removal were out of competency.
However, this was during COVID-19 where social distancing was being adhered to
and C&R training had not taken place. Staff competency in C&R needs to be
addressed as a priority. 
Recommendation 21: HMP Shotts should increase the C&R competency of staff to
the accepted level as a priority.

Page 62

49 
Recommendation 22: HMP Shotts must ensure that all planned removals are
recorded unless there is reasonable mitigation. 
4.2 Powers to confine prisoners to their cell, to segregate them or limit their
opportunities to associate with others are exercised appropriately, and their
management is effected with humanity and in accordance with the law.  The
focus is on reintegration as well as the continuing need for access to regime
and social contact. 
Rating: Generally acceptable practice 
When inspectors visited the SRU it was almost at full capacity.  This had been the
case for some time other than for short periods where numbers had dropped slightly.
When inspecting the SRU, 14 prisoners were located within the Unit.  Nine were on
rule 95(11), three on rule 95(12), including one prisoner on special security
measures (SSM), and two were on a refusal to return to association (RRA) following
the end of their rule, one of which had been on a RRA for a 92 days.  A sample of
rule 95(11) and 95(12) rules were checked on PR2 where prisoners had been in the
SRU for between 18 to 116 days.  All prisoners were found to be held lawfully, case
conferences, self-representations and narratives had been downloaded into the
Community Integration Plan (CIP) on PR2. The narratives were of good quality and
there was at least one record for each week. If something significant occurred this
was recorded at the time. 
Each prisoner had an individualised reintegration plan for returning to a residential
area or their move to another SRU.  However, there appeared to be some difficulty in
moving prisoners out of the SRU, even to their prison of allocation. One example
showed the prison attempting to move a prisoner to a number of prisons without
success. Work needs to done to assist in moving prisoners between SRUs, The
Prison Monitoring and Assurance Group (PMAG) should take a more active role in
deciding transfers, preventing long term stays in SRUs and inhibiting the potential for
a return to normal location. 
Prisoners reported a good understanding of their situation and confirmed that they
had received their entitlements of access to fresh air, a shower, the satellite
gymnasium and the phone, with most having access to in cell telephony.  All
prisoners had access to visits as well as a virtual visits console within the Unit.
However, prisoners could not access evening visits due to the SRU being on patrol. 
The SRU had a reasonable book and CD library along with a selection of clothes and
trainers for those who arrived with no belongings.  There were a number of prisoners
held under rule 95 in the residential areas, their regime was checked and confirmed
that they were receiving their entitlements. 
HMIPS were informed that recently the prison had increased the operational capacity
to include some cells in the SRU.  If a prisoner was removed to the SRU and placed
on a rule 95(11), his cell was cleared and filled by a transferred prisoner and
therefore no longer allocated to him.  If it was deemed appropriate to revoke the rule
earlier than planned it was difficult to re-integrate the prisoner as he no longer had a
cell to go to, and therefore prisoners may be held in the SRU longer than necessary.

Page 63

50 
HMIPS are of the view that the SRU cells should not be part of the occupancy level
of a prison. Every prisoner allocated to that prison must have a cell to return to at
whatever time was deemed appropriate and not risk being kept in an SRU longer
than necessary. 
Recommendation 23: The PMAG should intervene and take the decision as to
where a prisoner should move to when it is clear that a prisoner cannot be
reintegrated into the holding prison. 
Recommendation 24: SPS HQ should consider reducing the occupancy levels at
HMP Shotts so as not to include the SRU. 
4.3 The prison disciplinary system is used appropriately and in accordance
with the law. 
Rating: Satisfactory performance 
HMP Shotts had held approximately 550 disciplinary hearings since the 01 January
2022.  It was reported that since the introduction of photocopying prisoners personal
mail the number of disciplinary reports had reduced.  During the inspection a number
of hearings were observed and were found to be well run. Where prisoners were
included, they articulated that they understood the process, confirmed they had
received the charge within the specific time and were clear on the outcome. Where
a punishment was deemed appropriate they understood how to appeal the outcome.
Where a prisoner challenged the legality of the report, the adjudicator suspended the
hearing in order for an investigation to take place. 
The paperwork was completed as per SPS guidelines on disciplinary hearings 2018,
and although some of the narratives could have been more explanatory the
adjudicators worked well with the information they had. 
A local adjudication audit is carried out by the Deputy Governor on 10 random cases
per month. This audit revealed a number of examples where the paperwork was not
up to standard and was actioned to remedy the mistakes. The Deputy Governor
also ensured he observes at least one disciplinary hearing for each adjudicator
annually.  A recent PRL audit undertaken in April 2022, indicated 100% compliance,
with good narratives and evidence downloaded. 
Inspectors also observed the process undertaken where a prisoner did not wish to
attend and had pleaded guilty in their absence. This process was followed well. 
4.4 Powers to impose enhanced security measures on a prisoner are
exercised appropriately and in accordance with the law. 
Rating: Satisfactory performance 
HMP Shotts had six prisoners on enhanced or SSM in the past 12 months and had a
useful SSM flowchart to ensure compliance with the policy.  During the inspection
there was only one person on SSM, who was located in the SRU and had been
under these measures for an extended period of time. The SSM was well

Page 64

51 
documented and had described various stages of these measures, from having to
have three officers attend to him wearing full PPE to a stage where he was being
managed under normal SRU conditions unless he left the Unit.  At this point he was
subjected to the hand cuffing policy and this measure was accepted as the correct
action to take at this stage to manage his risk.  Reading the narratives, it was clear
that risk assessments had continued to be utilised in efforts to reduce the SSM. The
prisoner had attended most cases and there was evidence that there was a person
centred approach. Inspectors attempted to engage with the prisoner but he
declined. 
4.5 The law concerning the searching of prisoners and their property is
implemented thoroughly. 
Rating: Generally acceptable practice 
The regularly searching of prisoners and their property is necessary to ensure the
safety and wellbeing of all prisoners and staff, and to minimise the threat to stability
of the prison. It is the HMIPS view that it is also important that searching is not
targeted to certain individuals without due cause.  HMIPS were content that this was
not an issue at HMP Shotts. Recently, the process that all cells should be searched
at least once every quarter had been reintroduced after a period of time during the
pandemic where the SPS had reduced searching significantly in order to adhere to
social distancing. All areas had a searching record that annotated when cells and
areas were searched, and although there was a weekly audit carried out by a
residential FLM to ensure compliance, the completion of quarterly searches had not
always taken place. 
Apart from tactical searching most prisoners and their property appeared to be
searched at the same time every day.  This could present a risk whereby prisoners
could ensure their cells were clear of any illicit items during this time. HMIPS would
ask HMP Shotts to consider carrying out quarterly searches at random times of the
day rather that at the same time. 
An SOP on prisoner searching was available for staff to reference in SharePoint,
which outlined the requirement for any search to be person-centred and to
encourage positive engagement. Due to limited opportunities to observe a search
this was not tested. When asked, prisoners confirmed that searches had taken
place, that it was to help keep them safe and that they had been conducted fairly.
There was no evidence of any complaints around searching. 
The National Dog Unit was utilised regularly and was on site during the inspection.
However due to its workload, booking them to attend could be difficult. When
possible, the prison uses them to search cells, mail, staff and prisoners as well as
visitors. They can also be used purely as a deterrent, and its HMIPS view that it
would be beneficial if the prison had their own dog unit to utilise on a daily basis. 
Recommendation 25: HMP Shotts should ensure that all cells are searched at least
once per quarter and consider carrying them out at different times.

Page 65

52 
4.6 Prisoners’ personal property and cash are recorded and, where
appropriate, stored. The systems for regulating prisoners’ access to their own
money and property allow for the exercise of personal choice. 
Rating: Satisfactory performance 
HMP Shotts transferred prisoners in from other prisons, therefore property and
personal cash was already recorded in the SPS systems. 
All property arriving in reception was checked but not always in the presence of the
prisoner. Due to COVID-19 restrictions still being in force, space was limited. If
there were more than two prisoners arriving at the same time, prisoners did not stay
in reception other than to fulfil the basics requirements of the admission process.
This allowed prisoners to be removed from the escorting transport as quickly as
possible.
After completing the property check, the prisoners card was brought to the
residential area to be signed by the prisoner. There did not appear to be any issue
with prisoners not being present, but the reception will revert to previous practice
once guidelines allows.  Any issues the prisoner had about missing items was dealt
with by a residential officer.  In most cases there would be a request for the previous
property card to be scanned to the prison to check against what had arrived. 
It would be helpful if it was common practice for a copy of the previous property card
to be included with the transfer documentation. 
One issue that reception found was there were no national items in use list. This
could cause issues, particularly when a prisoner arrived from another prison with
items not permitted in HMP Shotts. 
Prisoners were able to access their property through a request book on the hall,
which was supported by an SOP that outlined the various reasons why prisoners
may wish to do so. Any property arriving in the reception was dealt with when time
allowed, normally on the same day which resulted in no back log. Single items such
as a watch were taken up to the prisoner for allocation, with items such as footwear
required to arrive at reception before being replaced. This process was a result of
previous incidents where prisoners had not handed in their old footwear.  Any cash
arriving in the mail was managed through a robust recording system. Prisoners
family and friends could transfer money electronically which arrived at SPS HQ. The
amounts received were then distributed to each prison, and the prisoners personal
cash account updated. In both cases the money was in the prisoners account on the
same working day. 
Due to COVID-19 restrictions it was not possible at this time to hand in cash or
property at the prison. This meant that families had to pay for deliveries and it was
difficult if purchases need to be returned, which could also be costly. 
The valuable property is held in a bag in a lockable cabinet, and were individually
listed on the prisoner property card.  However, these bags were not sealed.  New
bags had been purchased with seals but were not large enough to hold some
prisoner’s valuables. New bags had been ordered.

Page 66

53 
The key for the valuables cabinet was kept in a safe with a pin code.  However, this
was accessible by multiple staff, including the night shift manager, where the car
keys were held. When HMIPS raised the risk of too many staff having access to the
safe the prison reacted positively and purchased another safe for reception use only. 
Recommendation 26: SPS should consider including a copy of the sending prison
property card with the transfer documentation. 
4.7 The risk assessment procedure for any prisoner leaving the prison
under escort is thorough and implemented appropriately.  Any restraint
imposed upon the prisoner is the minimum required for the risk presented. 
Rating: Satisfactory performance 
The risk assessment procedure for any prisoner leaving the prison under escort was
thorough and implemented appropriately.  An FLM, when picking the escorts,
ensured that the person in charge was out of probation. Gender balance was also
taken into account for searching and medical procedures. 
The FLM carried out an assessment of the escort using PR2, and also consulted the
enhanced escorting list for those requiring special procedures. The list had good
information to help understand the issues that could arise while out on escort.  A
personal escort approval certificate/risk assessment was attached to the PER.  The
sheet included information of the past history of escorts, risks factors, rationale for
hand cuffing, instructions if the prisoner becomes unruly. If hand cuffs were to be
removed due to a medical request, the action the escorting team should take was
included. Where an enhanced escort was to take place the police were contacted.
The receiving hospital was also contacted for all escorts. 
A review of the frequently used locations was carried out by the IMU, and although
this has not been undertaken for some time, inspectors were satisfied that nothing
had changed since the last review. 
4.8 The law concerning the testing of prisoners for alcohol and controlled
drugs is implemented thoroughly. 
Rating: Satisfactory Performance 
HMP Shotts did not test for alcohol but had a Mandatory Drug Testing (MDT) Unit. 
Inspectors visited the MDT which was staffed full-time Monday to Friday, by three
staff. Prior to COVID-19 the prison was able to test approximately 1500 per year,
and although this had dropped during the pandemic it appeared they had kept up
with demand testing of 630 in 2021.  At the time of the inspection they had tested
295. The MDT Unit tested prisoners for various reasons including for progression,
where prisoners were tested within three months of transferring to the National Top
End or open conditions, for Integrated Case Management (ICM), for enhanced work
sheds, those who had been identified through intelligence reports, suspicion and on

Page 67

54 
the request of a prisoner. There did not appear to be any discrimination in the
testing process whether it was targeted testing or for those requiring it. 
Although the process was not tested in a live situation, inspectors were taken
through the MDT process and were satisfied that it was fair and lawful.  Staff were
very experienced. They were able to demonstrate the process well and explained
the steps taken dependant on the test result. There were no recent records of
complaints about the MDT process. 
4.9 The systems and procedures for monitoring, supervising and tracking
the movements and activities of prisoners inside the prison are implemented
effectively and thoroughly. 
Rating: Satisfactory performance 
Inspectors observed the movement of prisoners to work and education on numerous
days during the inspection.  Although numbers were not at the level pre-COVID-19,
the route was well controlled and effectively supervised. 
FLMs from regimes were responsible for the movement off prisoners to and from the
work areas.  Each hall was moved in a controlled manner to minimise the risk of
enemies meeting and to keep mainstream and protection prisoners apart. In most
cases each work party was escorted by the officer in charge of that workshop and
repeated at the end of the work period.  Those going to education was picked up
prior to the route moving by the education operations officers. 
All prisoners walked through a metal detector when leaving the residential areas and
on returning from their place of work or education.  All prisoners leaving work parties
were hand wanded on exit and then walked through a metal detector.  A percentage
of which were asked to walk past the cell sense detector.  If any prisoner was
carrying anything of bulk, they were required to put this through the x-ray machine.
There was no mandatory strip searching during route movements, but where
required the prisoner was taken to the reception area to be searched. 
Inspectors also observed the process for moving prisoners who were at risk i.e. from
the SRU, and this was also completed in a controlled manner.  Good
communications within the prison was observed allowing the transit of those
presenting a risk to be safe. 
4.10 The procedures for monitoring the prison perimeter, activity through the
vehicle gate and for searching of buildings and grounds are effective. 
Rating: Good performance 
An inspector accompanied officers during their perimeter security checks, which
were carried out on a minimum of three occasions per day, covering the early, back
and night shift.  On the perimeter checks a member of staff from each shift carry out
a observational check of the perimeter fencing, with each staff member undertaking
a third of a physical check known as a ‘push and pinch test’, checking the integrity of
the perimeter, ensuring that a complete physical check is carried out every 24 hours.

Page 68

55 
During the perimeter checks it was also observed that officers ensured that all
vehicles were locked, and that there were no illicit items thrown over the walls.  It
was noted that there was no rubbish on view and therefore it was easy to spot
packages that had been thrown over the perimeter.  Any items found were placed in
a production bag and sent to the IMU accompanied by a report from the officer,
detailing the find. This is important in tracking the most vulnerable points for
packages to be thrown over, days and times. 
The perimeter checks were also observed from the ECR.  The ECR kept a record of
checks and they were uploaded onto the SharePoint site, with an FLM checking
them at least once per week. 
The access and egress of vehicles was observed.  Staff communicated well with the
drivers and ensured that they followed the guidelines with regards to identifying
themselves and items not permitted i.e. personal communication devices.  Once the
staff member was content with the drivers credentials a thorough search of the
vehicle took place, which was carried out when the vehicle left the prison.  A number
of search aids were at the disposal of the member of staff. When GEOAmey
transport visited the prison a list of all registration numbers were available to staff,
and if the number was not in the list then the transportation would be refused entry
and the company contacted. 
A number of SOPs covering all aspects of this QI were available for reference by
staff. 
Good practice 7: The areas around the perimeter were clear of rubbish maximising
the opportunity to find items thrown over the perimeter.

Page 69

56 
STANDARD 5 - RESPECT, AUTONOMY AND PROTECTION AGAINST
MISTREATMENT 
A climate of mutual respect exists between staff and prisoners. Prisoners are
encouraged to take responsibility for themselves and their future. Their rights to
statutory protections and complaints processes are respected. 
Throughout the prison, staff and prisoners have a mutual understanding and
respect for each other and their responsibilities. They engage with each other
positively and constructively.  Prisoners are kept well informed about matters
which affect them and are treated humanely and with understanding.  If they
have problems or feel threatened they are offered effective support.  Prisoners
are encouraged to participate in decision making about their own lives. The
prison co-operates positively with agencies which exercise statutory powers
of complaints, investigation or supervision. 
Overall Rating:  Satisfactory performance 
In this standard, one quality indicator was rated as good performance and seven
were rated as satisfactory, giving an overall rating of satisfactory performance.
There was one example of good practice and one recommendation for improvement. 
The overall impression at the time of the inspection was of a calm and well run
establishment. Staff and prisoner relations appeared positive with a light and friendly
atmosphere in most areas.  Staff and prisoners addressed each other by their first
names and appeared to have good relations.  The regime was still restricted
somewhat by COVID-19 however there were opportunities for all prisoner groups to
spend significant time out of their cells whether attending work parties, education,
PT, exercise or general association on the hall.  It was noted that with the exception
of mealtime numbers checks, the halls were generally unlocked for most of the day.
This was appreciated by the prisoners having been restricted for much of the last two
years. 
Activities such as education and PT are timetabled by flat to preserve the internal
COVID-19 bubbles. This has worked well and has been scheduled to limit clashes
where a particular flat would have two activities offered at the same time. 
There continues to be disruption within the work parties due to offender outcomes
staff being deployed to the halls to cover staff shortages in the residential areas.
This is in turn limiting opportunities for prisoners to engage in meaningful activities
on a regular basis. In addition, there are no opportunities for protection prisoners to
engage in enhanced workshops that would increase their wage earning potential. 
The PIC is very impressive and contains a broad mix of programming interspersed
by adverts and announcements for internal courses and opportunities.  In addition, it
carries instructional videos to assist prisoners with using the kiosk system and
carrying out a lateral flow test among other things. 
During the inspection there were no IPMs on site however staff and prisoners were
aware of who they were and information on how to contact them was displayed

Page 70

57 
clearly in all halls.  It was stated by one individual in particular that having left a
message on the prison phone system the IPMs got in touch quickly to discuss his
issue.  Prisoner Complaint Forms were freely available on all flats and there was a
robust recording system in place to track the complaint from beginning up to external
remedies where required. 
In terms of the PANEL principles for this Standard: 
Participation.  Prisoners were fully involved in the ICM and Risk Management
Team (RMT) process with regard to pre-release and progression. Families
were invited to participate in the ICM process at the behest of prisoners. There
had been no PIAC meetings since the start of COVID-19 and this had led to a
reduction in user voice with regard to the current regime. 
Accountability.  Progression was a common complaint and echoes the
number of complaints received by HMIPS where progression is seen as unfair.
Delays in assessment and offending behaviour programme availability are
issues for both HMP Shotts and SPS HQ. 
Non-discrimination and equality.  The current regime for education, PT and
programmes allows equal opportunity for all prisoners to attend these sessions.
Protection prisoners did not have the opportunity to attend the enhanced work
party and were therefore denied the chance to increase their wage earning
potential. 
Empowerment. Given that the population of HMP Shotts was long-term
prisoners, the opportunities for support and engagement was clear across the
establishment. 
Legality.  There were no issues found around this point. 
Encouraging observations 
 The current regime has been designed to minimise clashes between education,
PT and exercise sessions. This reduced the times where an individual would
have to forgo one activity to attend another.
 The PIC currently in use was of a very good standard and was well maintained
by two individuals, with support from the education department. 
Emerging concerns 
 A Recovery Café and Whole Mind Café were previously facilitated in the
Tabernacle (TAB) within the Links Centre to support individuals with addiction
and mental health issues.  Since COVID-19 began these had not been held.
 Not all prisoners fit to work were currently required to do so. This had raised
some concern with regard to motivating individuals when a return to a full regime
was implemented.  Certain work parties were also operating sporadically at
times due to shortages in the residential areas.
 Programme delivery currently runs alongside the national waiting lists which
could cause delays in getting programmes started due to availability of transfers

Page 71

58 
from other establishments to fill the classes.  This was having an impact on the
number of courses that can run in the year.  This is causing concern for all
prisoners.

Page 72

59 
Quality Indicators 
5.1 The prison reliably passes critical information between prisoners and
their families. 
Rating:  Satisfactory performance 
Prisoners were afforded the opportunity to phone their family by the hall
staff/manager following transfer. This was particularly important for individuals
returned to closed conditions from HMP Castle Huntly, as generally these transfers
were not pre-planned and the opportunity to contact family prior to transfer would be
limited. 
Discussions with residential staff evidenced that contact between prisoners and
families was such that it would more often be the prisoner who was passing
information to staff in respect of ill health or bereavement of a family member.  This
information was generally received by the prisoner or a request would come from
outside, usually via the ECR, for the individual to phone home.  It was suggested that
in the majority of cases the prisoner would be expecting such news and would be
prepared for it. The hall staff would discuss this situation in private and remind the
individual of support available including the chaplaincy service and listeners. In the
event of a death of a relative, the relevant paperwork would be commenced and
used to confirm details and inform the process should the individual request to attend
the funeral. 
Family members were regularly invited to participate in the RMT process, and the
sharing of this information was conducted following written confirmation from the
prisoner. The prisoner provides the details of who they wished to be invited into this
process. 
Information was available on hall notice boards advising prisoners that Families
Outside could offer assistance to register and set up friends and family on the Virtual
Visit platform. The Link Centre officer and Family Contact Officer (FCO) promoted
family contact through physical and virtual visits, and could link with Families Outside
to support friends and families if required.  Information from the Links Centre Officer
suggested that they work with the FCO promoting and supporting family contact.
This was facilitated through the induction process and in the visitors waiting area
where staff interact with friends and family prior to visit sessions.  There was no FCO
on duty during the visit as one was on leave and the other had been reassigned to
another role due to staff shortages; worryingly this appeared to be an ongoing
situation. 
5.2 Relationships between staff and prisoners are respectful.  Staff
challenge prisoners’ unacceptable behaviour or attitudes and disrespectful
language or behaviour is not tolerated. 
Rating:  Satisfactory performance. 
During discussion with both staff and prisoners there was a reciprocal feeling of
mutual respect and healthy relationships. There were no issues around

Page 73

60 
unacceptable behaviours or language during the visit.  Interactions were jovial and
good natured. An individual had a request regarding when he would receive an
Xbox that he had ordered, staff contacted the reception and were able to provide an
update that the item was in reception and would be issued later in the day.  The
prisoner was content that this had been checked and that there was a positive
outcome. 
A number of visits to the SRU by the team throughout the inspection reported that
relationships appeared to be generally positive, and that the area was calm and the
staff appeared relaxed and confident. 
Offender Outcomes staff appeared to have positive relationships with those in the
work party. All individuals were engaged in their respective tasks and the workshops
had a general air of productivity with a relaxed atmosphere. There were no obvious
examples of inappropriate interaction during the visits.  Two sheds were closed due
to staffing issues in the halls. This had been a regular occurrence. 
5.3 Prisoners’ rights to confidentiality and privacy are respected by staff in
their interactions. 
Rating:  Good performance 
During the visit there were various interviews being conducted on the halls from
chaplaincy support, the Imam and NHS colleagues.  All of these interactions were
conducted in side rooms offering appropriate levels of confidentiality and privacy.
Prisoners also sought and were granted permission to use these rooms while
conversing with the inspection team.  During discussions, interview room doors were
closed in order that the conversations or treatments remained private.  Prisoners
were called down to the desk by name however no details of what they were
required for were relayed in this manner. This information was passed once the
individual had reached the main desk.  In most cases the individual was aware of
who was looking for him or where he was required to go, i.e. visits/surgery. White
boards and desks appeared clear of individual’s personal details and paperwork. 
5.4 The environment in the prison is orderly and predictable with staff
exercising authority in a legitimate manner. 
Rating:  Satisfactory performance 
There appeared to be limited interactions between staff and prisoners, however they
were conducted in an appropriate manner.  While some individuals were at work or
at exercise at various times during the inspection, those left on the hall appeared to
be content filling their time with social activities such as pool and snooker or in the
company of their peers either in cell or in the communal areas. Those on the hall
were happy to report that they spent more time out of cell in general association with
the current regime than before COVID-19. They were generally only locked up for a
numbers check prior to meal times.

Page 74

61 
Following complaints HMIPS received regarding staff dealing with an incident in the
NIC earlier this year, CCTV was viewed and the incident was explained by the IMU
manager. It would appear from the footage that this situation could have escalated
had it not been for the swift and professional actions of staff. There were no
concerns that this incident was dealt with in a heavy handed way and staff acted
appropriately given the seriousness of the situation. 
Throughout the visit staff interacted with prisoners in an appropriate manner and
were happy to take time to discuss any issues with an individual and explain the
rationale behind the decision making process. 
There were issues around the restricting of work parties either due to social
distancing in the workshops or Offender Outcomes staff being utilised to run the
residential regime. This led to a stop/start approach in some work areas which was
unsettling for individuals who relied on routine. 
5.5 Prisoners are consulted and kept well informed about the range of
recreational activities and the range of products in the prison canteen as well
as the prison procedures, services they may access and events taking place.
The systems for accessing such activities are equitable and allow for an
element of personal choice. 
Rating:  Satisfactory performance 
Various posters were displayed on noticeboards advertising support groups such as
AA/CA/Recovery Café/Whole Mind Café. These were accessed by asking hall staff
to contact the relevant facilitators. At present only AA and CA were taking place.
The Recovery Café and Whole Mind Café had been curtailed due to COVID-19 and
had yet to restart. 
There were further outlets for information sharing on the hall kiosk system. Staff on
duty at the time appeared not to be well informed about the system or how to access
it. The most that they could confidently do was print out menus which was done on
an app on SPIN terminals not on the kiosk. No one had a staff login that could
demonstrate the options available.  One prisoner was asked to demonstrate the
system and was very competent and complimentary about its functionality.  He
shared that the younger prisoner group were supporting those that were not as well
versed with technology. 
There was a PIC available to all that had been very well set up by two prisoners.
This PIC automatically plays a weeks’ worth of content.  It was set up to show
various programmes from documentaries to comedy shows and films.  In the “ad
breaks” between shows the two individuals who run the system had made short
presentations showing education opportunities/courses/how to videos for the kiosk
system and lateral flow testing among other information. The clips were animated to
keep them engaging for the target audience. The system also played podcasts
created in education which again had added graphic content to make them more

Page 75

62 
appealing to the viewer.  This is considered good practice and a model that could be
copied in other establishments. 
Good Practice 8: PIC showing clips including how to use the kiosk systems 
5.6 Prisoners have access to information necessary to safeguard
themselves against mistreatment. This includes unimpeded access to
statutory bodies, legal advice, the courts, state representatives and members
of national or international parliaments. 
Rating:  Satisfactory performance 
Copies of prison rules were available from staff in the halls for prisoner use.  In
addition, the prison library was well stocked with reference materials including:
Prison Rules and Directions, European Prison Rules, SPS Operating Standards,
Prisoner and Criminal Procedure Act, Data Protection information, European
Convention on Human Rights Legislation. 
Legal representative visits were booked and accessed through the visit area.  These
appointments were conducted either face-to-face or virtually.  In general face-to-face
visits were conducted in the closed visit area, however legal representatives
requiring to go through paperwork could request a larger non-segregated area in
which to conduct the meeting.  During the inspection the area was visited twice and
on both occasions it was virtual meetings taking place. These appeared to be
progressing with no technical issues. 
Court appearances could also be conducted in this area via a dedicated video link.
During the visit period there were no court hearings viewed. 
5.7 The prison complaints system works well. 
Rating:  Satisfactory performance 
Prisoner Complaint forms (PCFs) were freely available in halls and staff were aware
of where to find them on SharePoint should they require more copies. The process,
stages and relevant timescales were displayed within the halls on noticeboards. 
Some individuals were less than assured by the complaints process and stated that
they would ask for a photocopy of the complaint in order that they could evidence
submission of the form as they often disappeared. As there was no paper trail in this
instance there is no way to confirm if it was actually happening. Staff on the flats
would, in most cases, attempt to resolve any issues prior to the need to submit a
formal complaint. 
HMIPS highly recommends extending the use of the kiosk stem to include a
complaints process. 
A selection of PCF 1 and 2 forms were sampled. They all appeared to be well
managed. A date stamp on the front of the form indicated when the complaint had
been received from the FLM and further action dates such as Internal Complaints

Page 76

63 
Committee (ICC), GIC, etc. These appeared to be followed through in a timeous
manner up to the completion of an ICC where appropriate. The spreadsheet allowed
for tracking of the complaint through to the Scottish Public Service Ombudsman
(SPSO) for action. The responses appeared to be relative and proportionate to the
complaint. There were instances of multiple complaints from the same individual on
a similar vein submitted on the same day.  All of them were answered individually
and appropriately. Once a complaint had been received the details were logged on
a spreadsheet and scanned to a file on SharePoint. The spreadsheet was
completed for all stages of the process and any complaints that were still active were
highlighted in red text. 
On at least one occasion, related to the removal of a mobile phone, the governor
upheld the reasoning of the ICC in rejecting the appeal however indicated that the
handset should be returned to the individual to allow continued family contact. 
Recommendation 27: Consideration should be given to extending the kiosk system
to include an electronic complaints process. 
5.8 The system for allowing prisoners to see an Independent Prison Monitor
works well. 
Rating:  Satisfactory performance 
All halls had information displayed promoting the services available and contact
details of the IPMs. IPMs could also be contacted for free via the PIN phone system
and the prison issue mobiles. Individuals spoken to during the visit reported that the
system was working well and IPMs responded to messages in a timely manner.
While information was displayed on notice boards there did not appear to be
numbers displayed around the PIN phones. There were no IPMs on site during the
visit however prisoners did comment that there were frequent visits and the IPMs
were visible within the establishment.

Page 77

64 
STANDARD 6 - PURPOSEFUL ACTIVITY 
All prisoners are encouraged to use their time in prison constructively. Positive
family and community relationships are maintained. Prisoners are consulted in
planning the activities offered. 
The prison assists prisoners to use their time purposefully and constructively
and provides a broad range of activities, opportunities and services based on
the profile of needs of the prisoner population.  Prisoners are supported to
maintain positive relationships with family and friends in the community.
Prisoners have the opportunity to participate in recreational, sporting,
religious and cultural activities.  Prisoners’ sentences are managed
appropriately to prepare them for returning to their community. 
Overall Rating:  Generally Acceptable 
In this standard, three quality indicators were rated as good performance, four were
rated as satisfactory performance and seven were rated as generally acceptable
performance, giving an overall rating of generally acceptable. There was one
example of good practice and eight recommendations for improvement. 
The prison offered an appropriate and sufficient range of high quality employment
opportunities to prisoners.  Prisoners engaged well in their work parties including the
enhanced work parties which supported a commercial contract. Some work parties
were cancelled frequently as staff were required for operational duties.  As a result of
COVID-19 restrictions there had been no new registrations for vocational
qualifications in the past year. 
All prisoners were made aware of the system for paid work as part of their induction
process. The Shotts Employability Board (SEB) met weekly to review applications
and allocated prisoners to work parties. All prisoners were happy with the system for
applying for and changing their work placements. The SEB did not keep eligible
applicants on a waiting list for future opportunities.  Prisoners were required to
reapply every Monday if they were still interested in a work party opportunity. 
The Learning Centre provided a welcoming, bright and comfortable environment for
prisoners to engage in learning.  Prisoners and staff worked well together and
prisoners valued their positive relationships with staff.  Learning and teaching was of
a high quality and purposeful.  Induction was not compulsory and with no follow up
was a missed opportunity to welcome prisoners to education and to highlight all that
the Learning Centre had to offer.  Staff did not always take prisoners previous
qualifications, knowledge and experiences or barriers to learning into account when
discussing their future learning. 
The prison offered a sufficient range of physical and health education opportunities,
and these were available to all prison populations. The Physical Training Instructors
(PTIs) were proactive in responding to the individual needs of prisoners who
accessed the gym. The range of provision was limited and did not engage all
prisoners.  Due to COVID-19 restrictions no prisoners had gained sports and fitness
accreditation.

Page 78

65 
All prisoners had access to a well-stocked library, which took account of cultural and
religious backgrounds. The librarian and passman were skilled, knowledgeable and
proactive in promoting the library.  Feedback on the library rules, stock, service and
environment were captured, displayed and responded to. Nominated by the
prisoners, the library assistant received recognition as the staff member of the year
in the Fife College 2022 awards. 
A number of prisoners participated in a range of self-help and peer support
opportunities.  Prisoners produced the STIR magazine, a high quality art publication
with contributions from all prisons.  Prisoners who participated in art classes
produced high quality work culminating in a number of successes at the Koestler
Awards. All prisoners had access to a range of events prior to the pandemic. Over
the past two years, these were limited but plans were in place to resume them in the
near future. 
HMP Shotts were offering prisoners the opportunity to attend fresh air for a minimum
of one hour per day, including those on isolation due to COVID-19 and the SRU.
Access to fresh air was on a rotational basis offering different times across the week.
Due to the poor turnout on the morning sessions a recommendation has been made
to encourage participation by providing afternoon sessions every day. 
Although pastoral care was not available daily, requests and referrals were being
dealt with in good time. 
The visitors centre had a welcoming feel to it, staffed by a FCO and Getting Better
Together Shotts (GBTS) with an information loop on the TV and literature available
for visitors. Interaction between staff and visitors was positive. During the visit
sessions staff were not intrusive, whilst adhering to their security responsibilities.
Access to normal visits consisted of five, 45 minute visits sessions available to book
monthly. Uptake for morning and afternoon sessions was low. The father and child
visits appeared particularly popular with a variety of toys and game activities
available. However there were some complaints that father and child visits could be
difficult to access. It was pleasing to report that HMP Shotts had recently increased
the session from 12 to 18 prisoners; however even with the increase in spaces the
evening sessions were fully booked. Accordingly although the overall number of visit
opportunities seemed to meet the needs of the population, some sessions were
poorly utilised and others over-subscribed. There were plans to introduce the video
visit facility into the residential areas which could improve uptake. Those on
restricted visits (closed) were managed appropriately with regular reviews in place. 
HMP Shotts provided a  range of therapeutic treatments and cognitive development,
as well as social and relational skills training activities, to all those at HMP Shotts as
well as accommodating those on the national waiting lists. However there was some
criticism voiced by prisoners that the lack of accessibility to courses prior to their
critical dates ‘window’ was delaying their opportunity to gain progression or parole at
the earliest time possible. During the inspection there were 100 ICM cases
outstanding. The ICM co-ordinators were prioritising those individuals who required a
pre-release or pre-parole case conference. The ICM co-ordinators were very
enthusiastic and knowledgeable and were motivated to increase their own

Page 79

66 
throughput and eradicate the backlog. It was reported that in some cases the ICM
coordinators would complete Personal officer paperwork to meet ICM deadlines.
Personal Officer lists were found in every residential area, which were linked to a
master list held on the HMP Shotts SharePoint site.  Some areas had the list posted
on the prisoners notice boards, but in other areas these were only on the
noticeboard in staff offices. HMP Shotts should ensure that Personal Officer lists are
clearly posted where all prisoners can see them. The process for managing those on
an Order for Lifelong Restrictions (OLR) and the Multi-Agency Public Protection
Arrangements (MAPPA) worked well with good communication between partner
agencies. 
In terms of the PANEL principles for this Standard: 
Participation: Prisoners were given the opportunity of work through a SEB on a one
to one basis. Although there were some good examples of prisoners receiving
individual support and mentoring to enable them to participate in work parties, there
was also evidence where previous qualifications, knowledge and experiences or
barriers to learning of prisoners were not taken into account. Prisoners who did not
attend induction missed the opportunity to understand what was on offer as there
was no follow-up communication later. Almost all prisoners who met with Inspectors
highlighted the positive impact on their mental health and wellbeing as a result of
participation in gym activities. 
Any prisoner who requires an annual case conference although not approaching
their critical dates is asked if they wished a case conference. If they do, then an ICM
is arranged. 
Accountability: The education department took into account the prison regime to
minimise timetable clashes. Staff monitored the Library footfall, using the focus
group findings to increase usage. Although HMP Shotts had a Family Strategy plan,
this was now requiring a review due to being more than five years old. Regular case
reviews of OLRs are carried by the Psychology department along with the personal
officer, ensuring any new information is captured and is recorded in the national data
base. Any new risks can then be identified to the Parole co-ordinator/Life Liaison
Officer and a case conferences for referral is made to the RMT or MAPPA. 
Non-discrimination and equality: Educational opportunities were provided for all
prisoner regardless of classification. There were some restrictions on protection
prisoners attending enhanced work parties. Cultural events were vastly reduced due
to COVID-19 but with the commencement of the Equality and Diversity Group in
March 2022, plans were in place to return to the pre-pandemic timetable. The new
Kiosk system was now in operation throughout the prison, with a range of languages
on it, however not all prisoners were aware of this function. 
Prisoners were able to access a range of worship opportunities for different faiths
including Muslim and Buddhist services however staff shortages did impact on these
services.  Only those visitors deemed as a risk were placed on closed visit, all other
visitors were allowed open visits with prisoners, allowing prisoners children to see
their father during child/father visits.

Page 80

67 
Empowerment: Generally, most prisoners understood their rights for employment
and the opportunities for education. Education focus groups allowed prisoners to
suggest changes to timetables and subjects on offer and also ran focus groups twice
yearly to understand the needs of their clients. Unfortunately, there was no evidence
that the same process was in place for physical activity.
Although there had been a Children’s Visits Activity Plan in place, this had now
ended. HMP Shotts recognises the value of involving prisoners and their families in
developing a new plan by arranging focus groups, however this had not yet taken
place. 
Legality: Although the prison rules (82) state that all prisoners should work, this is
not compulsory at HMP Shotts. During the Inspection, both residential halls offered
all prisoners at least 60 mins of time in the fresh air to all prisoners. All prisoners
managed under closed restrictions were done so in accordance with the Prison
Rules. 
Encouraging observations 
 Good examples of prisoners who were ‘not yet ready’ to participate in work
parties being identified and supported well by their Personal Officer to work
towards being able to participate.
 Almost all prisoners who met with Inspectors highlighted the positive impact
on their mental health and wellbeing as a result of participation in gym
activities 
Emerging concerns 
 The number of work parties cancelled as staff were required for alternative
prison duties
 Those not attending Education Induction should be followed up
 COVID--19 restrictions had prevented prisoners gaining sports and fitness
accreditation.
 Registration for vocational qualifications had stalled
 There were no processes in place to consult with prisoners to take account of
individual interests and needs to inform future programmes. For example, for
those older adults and those with additional needs.
 The high number of outstanding ICM case conferences
 Prisoner perceptions of delays in progression or parole caused by limited
access to offending behaviours programmes

Page 81

68 
Quality Indicators 
6.1 There is an appropriate and sufficient range of good quality employment
and training opportunities available to prisoners. Prisoners are consulted in
the planning of activities offered and their engagement is encouraged. 
Rating:  Generally Acceptable 
The prison offered an appropriate and sufficient range of high quality employment
opportunities to prisoners.  These included work parties for gardens, laundry,
catering, wood assembly, wood machine, engineers, bike shed, occupational,
textiles, recycling and charity.  The prison also provided employment for pass men in
the residential halls, the education centre and gymnasium. 
Prisoners engaged well in their work parties including the enhanced work parties that
supported a commercial contract.  The prison had previously offered an extensive
range of vocational training opportunities prior to COVID-19 restrictions. 
All prisoners were made aware of the available work parties at induction and all
eligible prisoners were encouraged to attend a work party although employment is
not compulsory.  All eligible prisoners were given the opportunity to discuss their
employment opportunities on a one to one basis by attending the SEB who met
weekly to review and allocate available positions in work parties. 
There were good examples of prisoners receiving individual support and mentoring
to enable them to participate in work parties. 
The scheduling of employment and training opportunities had not been reviewed
since the start of COVID-19 restrictions. The SEB took no account of prisoner’s
suggestions for future work parties. 
The prison regime had changed as a result of dealing with high levels of staff
absenteeism. Some work parties were cancelled frequently as staff were required
for prison security duties. 
As a result of COVID-19 restrictions there had been no new registrations for
vocational qualifications in the past year. 
Recommendation 28: Registration for vocational qualifications should
recommence 
6.2 Prisoners participate in the system by which paid work is applied for
and allocated. The system reflects the individual needs of the prisoner and
matches the systems used in the employment market, where possible. 
Rating:  Generally Acceptable 
All prisoners were made aware of the system for paid work as part of their induction
process. The Shotts Prisoner Employment Policy supported the system for the
allocation of paid work.  The SEB met weekly to review applications and allocate

Page 82

69 
prisoners to work parties.  Almost all prisoners understood the rationale of selection
for paid work, although some categories of prisoners were not eligible to apply for
enhanced work parties. 
All eligible prisoners were able to apply for employment, or request a change of
employment through the SEB.  Prisoners were able to attend the SEB to discuss
their application and to receive feedback.  All prisoners were happy with the system
for applying for and changing their work placements. 
There were good examples of prisoners who were ‘not yet ready’ to participate in
work parties being identified and supported well by their Personal Officer to work
towards being able to participate. 
Information regarding the availability of work parties was advertised in the
accommodation halls, although the prison did not systematically advertise vacancies
in work parties and relied on word-of-mouth. 
When a prisoner’s application for a work party was unsuccessful, the SEB did not
keep eligible applicants on a waiting list for future opportunities.  Prisoners were
required to reapply every Monday if they were still interested in a work party
opportunity. 
6.3 There is an appropriate and sufficient range of good quality educational
activities available to the prisoners. Prisoners are consulted in the planning of
activities offered and their engagement is encouraged. 
Rating:  Generally Acceptable 
The Learning Centre provided a welcoming, bright and comfortable environment for
prisoners to engage in learning.  The centre was fit for purpose and well equipped
with a range of resources including the library.  Prisoners and staff worked well
together and prisoners valued their positive relationships with staff.  Learning and
teaching was of a high quality and purposeful.  Staff adapted their learning and
teaching approaches effectively to meet the needs of learners who were motivated
and engaged in learning.  A few prisoners were making good use of resources to
support self-directed study. 
Prisoners participated in a wide range of subjects and qualifications at Scottish
Credit and Qualifications Framework levels 3-6 across 12 subject areas including
Communications, ICT, and Numeracy.  There were a total of 13 prisoners
participating in Open University courses with five continuing and eight who had
recently applied. 
The Learning Centre Manager (LCM) held focus groups with prisoners to gather
suggestions about changes to timetables and subjects on offer. 
Education opportunities were promoted within the halls and on the PIC. The LCM
liaised informally with other areas within the prison and took account of their
timetables when scheduling classes in order to minimise timetable clashes.  The
prison encouraged prisoners to participate in education and they received the

Page 83

70 
appropriate wage from their work party whilst they attended the learning centre.
Educational opportunities were provided for all categories of prisoner with timetabled
provision for prisoners on protection regimes. 
All prisoners were informed that they had been scheduled for an induction session to
education shortly after they arrived in the prison.  If they didn’t attend at this time,
there was no follow-up communication.  This was a missed opportunity to welcome
prisoners to education and to highlight all that the Learning Centre had to offer. 
During induction, Learning Centre staff made prisoners aware of the range of
educational opportunities available within the prison.  This provided an opportunity
for staff to identify and support any prisoner requiring additional learning support.
However, staff did not always take prisoners previous qualifications, knowledge and
experiences or barriers to learning into account when discussing their future
learning. 
6.4 There is an appropriate and sufficient range of physical and health
educational activities available to the prisoners and they are afforded access
to participate in sporting or fitness activities relevant to a wide range of
interests, needs and abilities. Prisoners are consulted in the planning of
activities offered and their engagement is encouraged. 
Rating:  Generally Acceptable 
The prison offered a sufficient range of physical and health educational opportunities
and these were available to all prison populations. A change in regime due to the
impact of COVID-19 has resulted in each residential level having individual access to
the gym on a daily basis. As a result, attendance has increased to approximately 100
prisoners per day.  The available space was used well to facilitate the increased
numbers. For example, cardio equipment was in one area and weights were in the
main hall area. 
The PTIs were proactive in responding to the individual needs of the prisoners who
accessed the gym. This included an assessment using the physical activity
readiness questionnaire and induction with a PTI before accessing physical activity.
Personal training plans and health and nutrition advice and information was also
provided on request. 
Relationships between the PTIs and prisoners were strong and their experience and
support was valued.  Almost all prisoners who met with Inspectors highlighted the
positive impact on their mental health and wellbeing as a result of participation in
gym activities.  Prior to the pandemic, in partnership with Fife College, a few
prisoners achieved accreditation in recognition of their achievements. 
The satellite gyms, which mainly consisted of cardio equipment in each of the
residential halls were well used.  In the NIC, weights equipment was also available,
used well and prisoners were supported by a prison officer. There were a few
examples where PTIs have provided individual programmes for use in these areas
and promotional materials for the gym were on display in all residential halls.

Page 84

71 
The range of provision was limited and did not engage all prisoners.  Due to
COVID--19 restrictions no prisoners had gained sports and fitness accreditation. 
There were no processes in place to consult with prisoners to take account of
individual interests and needs to inform future programmes.  For example, for those
older adults and those with additional needs. 
Recommendation 29: Sports and fitness accreditation should be
recommenced. 
6.5 Prisoners are afforded access to a library which is well-stocked with
materials that take account of the cultural and religious backgrounds of the
prisoner population. 
Rating:  Good 
All prisoners had access to a well-stocked library, which took account of cultural and
religious backgrounds. This included books, audio material, DVDs and electronic
games. An easy read section was also in place to support those with lower level
reading ability.  Coloured overlays were also available to support those with dyslexia.
A smaller library resource was also located in the SRU.  Regular donations from
prisoners, the public and West Lothian Council library service also helped to expand
the library content. The use of the Dewey decimal classification system to arrange
books via subject aligned well with the library systems used in communities. 
Library resources were accessed by attending the library or through the well-
established request service.  The librarian and passman were skilled, knowledgeable
and proactive in promoting the library.  They supported prisoners to make best use 
of the resources and developed new initiatives to respond to identified needs.  This
included the partnership with NHS to develop a self-help service in response to a
growing need for support with mental health.  Self-help resources were displayed
well and were widely accessible, including a confidential request service where
information was delivered to residential areas.  Requests for resources had
increased and feedback was positive, including informal feedback across the wider
prison population. The library assistant had completed first aid in mental health
training, which had strengthened her knowledge in this area. 
The library assistant regularly visited halls to distribute information leaflets and
promote the library.  In cell reading materials were shared and goal setting and
achievements were discussed regularly with prisoners.  The library assistant, with
good support from the passman developed and delivered a number of other
programmes or activities.  For example, monthly book groups and a regular podcast
took place with all content identified by the prisoners. This included, music, book
reviews, information sharing and inputs from partners.  Partners, such as
psychological services welcomed the opportunity to share information and demystify
their profession. The Friday morning ‘Minds Matters’ sessions facilitated access to
advice and information in response to an increase in mental health issues.  Topics
included mental health, suicide prevention, addiction, trauma, meditation and regular
visits from a therapet, which was very popular.

Page 85

72 
Library staff recorded footfall in the library on an ongoing basis and consulted with
prisoners twice yearly.  This showed that footfall was increasing.  Feedback on the
library rules, stock, service and environment were captured, displayed and
responded to. Nominated by the prisoners, the library assistant received recognition
as the staff member of the year in the Fife College 2022 awards. 
6.6 Prisoners have access to a variety of cultural, recreational, self-help or
peer support activities that are relevant to a wide range of interests and
abilities. Prisoners are consulted on the range of activities and their
participation is encouraged. 
Rating:  Generally Acceptable 
All prisoners had access to a range of events prior to the pandemic. Over the past
two years these have been limited but plans were in place to resume these in the
near future.  The Equality and Diversity Group held its first meeting in March 2022
and there were plans to build on the work of this group to design a varied
programme of events for all prisoners. 
The Kiosk system that operates throughout the prison was available in a range of
languages, however, not all prisoners were aware of this function. 
Prisoners who participated in art classes produced high quality work culminating in a
number of successes at the Koestler Awards.  Sixty-four pieces of art work were
entered in 2022 with a further 15 entries in relation to graphic design, poetry and
creative writing.  In previous years, a few prisoners successfully gained gold and
platinum Koestler Awards. 
Prisoners produced the STIR magazine, a high quality publication with contributions
from all prisons. The content, with its focus on creativity and self-expression such as
body art, was relevant to the prison population.  The Editorial Group, consisted of
four long-term prisoners who oversaw the production of the magazine.  Supported by
Fife College and distributed to 13 prisons across Scotland this provided an
opportunity for prisoners to achieve individual goals.  Similarly, the Snapshot monthly
magazine written and designed by HMP Shotts prisoners was of good quality with
content relevant to their context. 
A number of prisoners participated in a range of self-help and peer support
opportunities, including a listener service, although these were limited.  A systematic
and planned approach to encourage participation would have benefitted the prison
population. 
6.7 All prisoners have the opportunity to take exercise for at least one hour
in the open air every day.  All reasonable steps are taken to ensure provision
is made during inclement weather. 
Rating:  Satisfactory 
During the Inspection, both residential halls were found to be operating time in the
fresh air to all prisoners for a minimum of one hour per day.  The four periods were

Page 86

73 
for set times, but this was on a rotational basis ensuring each area had access at
different times across the week. The timetable for accessing time in the fresh air
was found on all hall notice boards. 
In every area a provision of outdoor weatherproof clothing was present, which
appeared to be sufficient to accommodate everyone wishing to use it. The two
periods in the morning were poorly attended from both of the residential halls.
Attendance at afternoon sessions appeared much more popular with the prisoner
groups.  Staff advised that prior to COVID-19 only two sessions operated which
meant grouping areas appropriately; such as Allenton levels 1 and 2 which both
house protection prisoners. 
During the observation of an afternoon session a number of prisoners requested
access back into the hall prior to the hour ending (referred to as ‘half-time’) which
staff accommodated, the remaining prisoners enjoyed their full hour.  This appeared
to be a common practice, and the flexibility of staff to facilitate this ensured that
prisoner’s needs or preferences were accommodated. 
One area reported having two individuals who were isolating due to COVID-19, both
of whom were consistently offered their hour in the fresh air separate from other
prisoners. 
The SRU was also found to consistently offering a daily hour in the fresh air to all
prisoners. 
During the inspection period, all prisoners located in one specific area were
restricted from having their opportunity of an hour in the fresh air due to on-going
security concerns.  These restrictions were applied appropriately and in full
compliance with the Prison Rules. 
Recommendation 30: HMP Shotts should review the exercise timetable to
appropriately group areas and consider scope to provide afternoon access to
all prisoners every day. 
6.8 Prisoners are assisted in their religious observances. 
Rating:  Satisfactory 
The timetable for the various religious services was published and on display in all
residential areas. 
The faith centre was bright and welcoming, with good décor and suitable to arrange
for a wide variety of services or requirements. 
The pastoral team were awaiting the arrival of a new member of staff, due around
the end of May.  Currently, not all days had a member of the team on duty, but all
requests and referrals were being dealt with in good time.  There had also been
some issues with the attendance of an Imam, but this had been resolved.

Page 87

74 
Unfortunately, with reduced staffing the ability to deliver additional faith studies had
been impacted. Previously up to four varying study groups were facilitated annually.
It was hoped that after May, staffing would allow for the recommencement of a range
of faith studies. 
The care of the pastoral team was evident through their willingness to provide, what
they describe as ‘softer’ services, not directly linked to or based on one’s faith.  Their
willingness not just to attend to the ‘needs’ relating to faith but, trying to ensure any
‘needs’ of any prisoner were addressed is to be commended. 
6.9 The prison maximises the opportunities for prisoners to meet and
interact with their families and friends.  Additionally, opportunities for
prisoners to interact with family members in a variety of parental and other
roles are provided. The prison facilitates a free flow of communication
between prisoners and their families to sustain ties. 
Rating:  Generally acceptable 
The Visits Centre was a welcoming venue, staffed by an FCO and Getting Better
Together Shotts (GBTS). There was an information loop on screen and literature to
assist families through their interaction with the prison and wider support groups. 
HMP Shotts provided a Family Strategy, however the five-year plan had expired in
March of this year. The plan appeared to have been last updated in October 2019,
and although a number of actions were completed there remained some which were
on-going.  Indeed, the plan appears not to have been reviewed and updated during
the COVID-19 pandemic which was surprising. 
The FCO provided the Children’s Visits Activity Plan which showed activities across
approximately 10 weeks for health, fitness, learning or general fun for children and
families. This plan had ended with no replacement but inspectors were advised that
families and prisoners were being consulted for the creation of a new Activity Plan.
This was confirmed by managers who stated that user voices were important and
that a survey was imminent for prisoner and families to shape services in the visits. 
The father and child visits appeared very popular with both prisoners and families.
Staff positioned themselves well to maintain appropriate observations, but did so in a
manner which was not intrusive nor impacted on the fun that the children present
appeared to be having.  A wide variety of toys and game activities were brought into
the visit room which appeared to generate greater interactions between the fathers
and their children. A stark contrast to the normal family visits where paper and
colouring pencils were the only activity offered. 
Due to the pandemic, capacity of the visits required a reconfiguration of the layout,
and part of this included the removal of the soft play area facilities (at the time of the
inspection this area was still being used to store excess tables and chairs).
Refreshment for all visits could be purchased from a number of vending machines
which appeared well stocked.  There previously was a tea-bar facility but this closed
prior to the pandemic and had not yet been reopened.

Page 88

75 
Prisoners were entitled to book five 45-minute visits sessions per month, inclusive of
one evening and one weekend session per week.  However, several prisoners
commented that it could be difficult to access the Father and Child visits.  Indeed,
normal family visits in the evening or over the weekend appeared to be prime time
with session often fully booked, and some prisoners reported that if these sessions
were full then they would be without a visit that week.  Conversely, morning and
afternoon sessions appeared to be very poorly attended with numbers extremely
low.  In one instance HMIPS found a session where only three visits were booked
and no visitors actually attended.  During the inspection restrictions on capacity were
lessened, increasing the session from 12 to 18 prisoners but even with additional
places the evening sessions were fully booked. 
Recommendation 31: HMP Shotts should prioritise creating a new Family
Strategy to plan improvements going forward and complete consultations with
families around development of a new Children’s Visits Activity Plan. HMP
Shotts should re-instate the soft play area as soon as possible and review what
activities can be provided for children during normal family visits. 
Recommendations 32:  HMP Shotts should review availability of visit sessions
and maximise places in evening and weekends which best suit prisoners and
families. 
6.10 Arrangements for admitting family members and friends into the prison
are welcoming and offer appropriate support.  The atmosphere in the Visit
Room is friendly, and while effective measures are adopted to maintain
security, supervision is unobtrusive. 
Rating:  Satisfactory practice 
A number of observations of admitting visitors to the prison and visits sessions were
carried out.  At all times, staff were found to be professional, they were courteous to
visitors on arrival and helpful during visits sessions.  Staff were observed dealing
with a visitor who had mobility restrictions and their actions ensured that during
necessary security checks no discomfort was placed on the individual.  Visitors for
one prisoner arrived when a visit had not been booked.  Staff reviewed this
appropriately and accommodated the visit, which was appreciated by the visitors. 
During visits sessions staff were observed to position themselves appropriately to
maintain good overall security supervision, but not in a manner which would appear
intrusive to either prisoners or visitors.  Throughout all observations, the atmosphere
in the visits room was relaxed and calm with all attendees appearing to interact freely
without feeling scrutinised. 
GBTS staff the Visits Centre, however current provision only extends to week days
and Saturday mornings.  Inspectors were advised that GBTS were seeking to
increase funding and provide staff across all visits sessions, and HMP Shotts should
support them with this.  The Centre was welcoming and well provisioned to support
visitors, especially those with younger children. Whilst the GBTS staff were present
there was a wide variety of activities for children as well as refreshments and
information for families.

Page 89

76 
6.11 Where it is not possible for families to use the normal arrangements for
visits, the prison is proactive in taking alternative steps to assist prisoners in
sustaining family relationships. 
Rating:  Good 
Within the main visits area, HMP Shotts had five video conference units which could
be booked through the normal visits process by submitting a visits request.
Inspectors were advised that planning was underway to move this facility into the
residential halls. This would potentially increase the capacity for the visits room for
those seeking in person family contact, as well as, give potentially greater
accessibility and flexibility to those wishing to undertake video visits. 
A video conference unit was also available within the SRU.  Logistically, this
benefited the whole establishment without creating the necessity to alter the regime
when prisoners held within the SRU booked a video visit.  This also ensured minimal
disruption to regular family visits where additional staff would have been deployed
within the visit room specifically for security of the individual from the SRU. This was
considered good practice. 
The video visits that were observed appeared to run without issue but again were
poorly utilised, with often only one or two prisoners and there was capacity for five.
One potential issue was that although the prisoner had headphones, some appeared
distracted by what was happening around them in the visits room.  This possible
distraction could be compared to having a call in a busy workplace or crowded room.
Quieter surroundings may improve uptake and enjoyment of this facility. 
The prisoner induction included an offer of a family/friends induction on the facilities,
support and range of opportunities available in the prison, in order that families can
better understand what life in the prison is actually like. 
Good Practice 9: Video visits for prisoners in the SRU were facilitated within
the SRU, which prevented any potential disruption to the main visit area. 
6.12 Any restrictions placed on the conditions under which prisoners may
meet with their families or friends take account of the importance placed on
the maintenance of good family and social relationships throughout their
sentence. 
Rating:  Good 
During the inspection, only four prisoners were listed as being under restrictions for
family visits and all were reviewed at minimum monthly by committee.  All prisoners
who were currently being managed under closed restrictions were done so in
accordance with the Prison Rules.  A review of these individuals and discussions
with staff evidenced that each case was assessed on its own merits and decisions
were tailored to the individual and the circumstances. 
One such individual, previously on the closed list, was reviewed and the restrictions
were removed. They are now able to enjoy open visits with the majority of their

Page 90

77 
family and friends.  However, one of their visitors remained a risk and was therefore
banned from entering the establishment.  The prisoner was offered virtual visits with
this individual. This was good use of the virtual facilities to maintain the family
contact. 
6.13 There is an appropriate and sufficient range of therapeutic treatment
and cognitive development opportunities as well as an appropriate and
sufficient range of social and relational skills training activities available to
prisoners. 
Rating:  Satisfactory 
HMP Shotts provided an appropriate range of therapeutic treatments and cognitive
development, as well as social and relational skills training activities. A number of
prisoners had transferred into HMP Shotts specifically to complete a course when
the national waiting list triggered their attendance.  Access to all courses was
available to both mainstream prisoners and those in the protection regime. 
The Programmes Team delivered Constructs, Self-change Programme, Discovery
and Pathways. 
As with all Prisons in Scotland, HMP Shotts adhered to the national waiting lists for
prisoner attendance on the course identified for their specific needs.  HMP Shotts
was one of the few prisons offering some of these courses, which created logistical
challenges but also other concerns.  The lists provided showed that some prisoners
may have to wait a considerable time in order to access and benefit from this
opportunity. 
A number of prisoners voiced their concerns with regards to accessing programmes.
It was felt by both indeterminate and determinate sentenced prisoners that the
inability to access courses prior to their critical dates ‘window’ was delaying their
opportunity to gain progression or parole at the earliest time possible.  A number
stated that this was the “SPS’ fault” and not theirs. 
Additionally, there was a concern regarding the approach to implementing the
national waiting list which appeared to take no cognisance of the individual out with
calculated critical dates.  As such, prisoners who had served extremely long periods
within HMP Shotts were informed that the next available space on a course meant
they required to transfer to another establishment.  Some prisoner had built
friendships and a peer group who supported them, it may also place further hardship
on their family if they decide to transfer for a course.  The same could be the position
for those prisoners who require to transfer to HMP Shotts for a programme. This is
not a person-centred approach. 
Recommendation 33: SPS HQ should review the policy for implementing a
national waiting list for access to programmes and its capacity for delivering
programmes against demand to ensure there is no detrimental effect on the
care of individuals in custody or their ability to progress.

Page 91

78 
6.14 The prison operates an individualised approach to effective prisoner
case management, which takes account of critical dates for progression and
release on parole or licence. Prisoners participate in decision making and
procedures provide for family involvement where appropriate. 
Rating:  Generally acceptable 
At the time of the inspection, it was found that approximately 100 ICM case
conferences were outstanding. 
Currently, the ICM co-ordinators were prioritising those individuals who required a
pre-release or pre-parole case conference. Those individuals who required an
annual case conference, where they were not approaching any critical dates, were
written to asking if they wished a case conference at this time. Where the individual
requested it the ICM co-ordinators would always oblige. 
Where appropriate the ICM co-ordinator would seek family involvement. However,
although most pandemic restrictions had been removed, approximately only one in
four family members who were invited to attend actually did so. 
The ICM co-ordinators were very enthusiastic and knowledgeable.  There was a
keen motivation to increase their own throughput and eradicate the backlog.  In
some instances, for those approaching critical dates, the ICM co-ordinators would
complete missed Personal Officer interviews to ensure that the case conference
could proceed without further delay. 
Personal Officer lists were found in every residential area, which were linked to a
master list held on the HMP Shotts SharePoint site. All prisoners were listed with a
named officer identified.  Some areas had the list posted on the prisoners notice
boards, but in other areas these were only on the noticeboard in staff offices. HMP
Shotts should ensure that Personal Officer lists are clearly posted where all
prisoners can see them. 
Recommendation 34: HMP Shotts should ensure that, whenever possible, it
is always the Personal Officer that completes the required interview and
documentation for the ICM process. 
Recommendation 35: HMP Shotts should continue to support ICM staff to
address the backlog and bring all case conferences up to date. 
6.15 Systems and procedures used to identify prisoners for release or
periods of leave are implemented fairly and effectively, observing the
implementation of risk management measures such as Orders for Lifelong
Restriction (OLR) and Multi-Agency Public Protection Arrangements (MAPPA). 
Rating:  Good 
The connectivity between internal departments evidenced a good level of
communication relating to those prisoners identified for progression or potential
release. The ICM co-ordinators knowledge and experience had promoted effective

Page 92

79 
relationships and information sharing with all partners, whether managing individuals
through MAPPA or those on an Order for Lifelong Restrictions (OLR). 
All OLR prisoners were managed nationally by the Head of Psychology, with regular
case reviews led by the Psychologist within HMP Shotts. This included meeting with
the Personal Officer to discuss the individual and any potential new information and
the national database recorded monthly meetings. 
The ICM co-ordinators liaised with the Parole co-ordinator/Life Liaison Officer where
potential risks were identified through case conferences for referral to RMT or
MAPPA.

Page 93

80 
STANDARD 7 - TRANSITIONS FROM CUSTODY TO LIFE IN THE COMMUNITY 
Prisoners are prepared for their successful return to the community. 
The prison is active in supporting prisoners for returning successfully to their
community at the conclusion of their sentence. The prison works with
agencies in the community to ensure that resettlement plans are prepared,
including specific plans for employment, training, education, healthcare,
housing and financial management. 
Inspection Findings 
Overall rating:  Generally Acceptable Performance 
In this standard, two quality indicators were rated as satisfactory and three were
rated as generally acceptable, giving an overall rating of generally acceptable.
There were two examples of good practice and five recommendations for
improvement. 
Relevant Information for this standard 
HMP Shotts is the only establishment in Scotland that is categorised as a long-term
prison however during the inspection there were 15 prisoners serving under four
years, including recalls. The following findings therefore need to be read in the
context of the following information: 
 Most prisoners are not liberated from HMP Shotts, but progress to other
prisons to prepare for release.
 HMP Shotts does not have the same role as other establishments in terms of
preparing prisoners for their successful return to the community.
 The prison liberates between 60 and 100 prisoners each year, with almost all
released on non-parole licence, and not subject to statutory supervision by
community-based social work services.  The prison has a key role in supporting and approving progression of
prisoners to National Top End (NTE) establishments and the open estate.
Therefore, the prison has a responsibility for preparing individuals
appropriately for these important transitions. 
In terms of the PANEL principles: 
Participation: Prisoners in HMP Shotts had good opportunities to get involved
in key planning processes.  ICM meetings were appropriately focussed on the
individual prisoner. The prisoners were encouraged to share their views about
the support they may require and access to services for helping them prepare
for release or progression to less secure conditions. Prisoners were
encouraged to become fully involved in the completion of reports by prison staff
and prison based social workers.  Families were provided with relevant
information on the key planning processes and were encouraged to take part in
ICM meetings where appropriate, although the numbers attending were low.

Page 94

81 
Accountability: The delivery of accredited programmes at HMP Shotts
reflected the needs of the population.  There were clear attempts to be flexible
to meet individual needs and examples of innovation to further develop these
programmes. There was an outstanding need to review the broader delivery
of interventions with a particular focus on meeting the support needs of a
prison population affected by addictions, trauma and loss.  The pre-release
ICM meeting was key to identifying any concerns about plans for transition.
These meetings ensured that all relevant support services were aware of the
individual’s circumstances and the supports needed. 
Non-discrimination and equality: The importance of initial case conferences
as part of the ICM processes was understood by key staff and every effort
was made to ensure that these meetings had all the information they needed
for identifying any vulnerabilities.  Accessibility issues were discussed within
the Programme Case Management Board (PCMB) and solutions developed to
ensure that barriers to attending programmes delivered in the establishment
were removed. 
Empowerment: Prisoners were placed at the centre of the ICM meetings.
Preparatory discussions sought to ensure they understood the process of
these meetings and were enabled to contribute.  The format of these
meetings ensured that prisoners had an opportunity to comment or ask
questions regarding sentence plans.  Care was taken to ensure that prisoners
understood what was being said as well as any decision and outcomes from
the meeting. 
There was a mixed understanding among prisoners about the range of
services available to them. There were also examples of variability in the
quality of communication with prisoners about decision making related to their
progression.  As a result, some prisoners felt ill informed about plans for
progression and eventual release.  There was some uncertainty about what
may be in place for them in terms of future community supports. 
Legality: There was an appropriate emphasis on meeting legal obligations
and the role of community-based services in meeting the needs of individuals
making the transition from custody to life in the community.
Community-based social work services played a key role in ensuring that
services in the community were in place to enhance the likelihood of a
successful future integration.  Despite this, some prisoners were unclear
about plans for release and were not confident that they would have access to
the support they needed, including access to appropriate housing. 
Encouraging observations 
 The co-location of interventions, psychology and prison based social work
(PBSW) teams enabled opportunities for case discussion and reflection. In turn
this promoted understanding of each other’s role.
 HMP Shotts prioritised the resumption of programme delivery following the
lockdown. As a result, the programme delivery team was able to progress
innovations to improve the content of existing programmes.

Page 95

82 
Emerging concerns 
 HMP Shotts should explore potential partnerships to offer independent advice in
relation to the issues likely to concern all prisoners due for release from
HMP Shotts, e.g. financial, housing, employment. This will help to ensure that
prisoners have the access they need to advice relevant for making successful
plans for release.
 HMP Shotts should improve consistency in the role played by personal officers
(POs) in supporting individuals, including attendance at pre-release ICM
meetings and ongoing time with prisoners prior to release.  This will promote the
confidence of prisoners in the plans for their release.
 HMP Shotts should explore opportunities to gather evidence on the progress and
outcomes for individuals liberated from the prison to inform service delivery and
support continuous improvement.  This will help to ensure that prisoners benefit
from evidence-based approaches to the successful return of individuals from
custody to the community.
 To help to prepare prisoners for the significant transition from custody, HMP
Shotts should promote the delivery of a formal ‘life skills’ learning opportunity.

Page 96

83 
Quality Indicators 
7.1 Government agencies, private and third sector services are facilitated to
work together to prepare a jointly agreed release plan and ensure continuity of
support to meet the community integration needs of each prisoner. 
Rating: Generally acceptable 
Collaboration between agencies based within the prison was effective.  Appropriate
efforts were made to identify services to support individual prisoners’ sentence plans
and eventual community integration needs.  The pre-release ICM meeting was a key
step in the process. Efficient preparations ensured the right people were involved in
ICM meetings, including family and community-based services.  The meetings were
focussed on the individual and their plan for progression and eventual release.  This
included identifying support needs and how they were to be met. 
The Link Centre had a limited resource.  Efforts concentrated on addressing
potential logistical barriers to progression and eventual reintegration, including
access to a bank account and accepted identification documents.  This was
undoubtedly a valuable service.  There were few external or community-based
agencies with a regular presence in the prison. There was an emphasis on, and
expectation of, community-based social workers (CBSW) to engage and involve
services in planning for release.  Access to independent general advice such as on
benefits, financial matters or housing was not available to prisoners. 
Recommendation 36:  HMP Shotts should explore potential partnerships to
offer independent advice in relation to the issues likely to concern all prisoners
due for release. This will help to ensure that prisoners have the access they
need to advice relevant for making successful plans for release. 
7.2 Where there is a statutory duty on any agency to supervise a prisoner
after release, all reasonable steps are taken to ensure this happens in
accordance with relevant legislation and guidance. 
Rating:  Satisfactory 
The ICM process was well established and there was a consistent approach to the
efficient coordination of these meetings.  There was consistent attendance from
PBSW and CBSW who were both involved in the preparation of assessments to
inform sentence planning and the formulation of pre-release plans. 
Knowledge of the ICM process among prisoners and staff was satisfactory.  The
involvement of POs in meetings and the overall quality of reports was mixed.  POs
reported that it would be beneficial for ICMs to be arranged when they were on shift.
New residential officers (direct entrants) made comment that there should be more
emphasis placed on PO work while they were at the SPS college for initial training,
and they felt unprepared when returning to their establishment.

Page 97

84 
Collaboration between PBSW and CBSW from various parts of the country was
challenging.  However, the experienced PBSW Team worked hard to ensure that
communication was effective. 
PBSW staff consistently fulfilled their responsibilities in the preparation of
assessments and reports to assist decision making.  The social work contribution
was valued. Social workers were core members of the RMT, and alongside
colleagues from psychology provided relevant expertise and knowledge to support
and inform defensible decision making in relation to sentence progression and
access to the open estate. Assessments and reports prepared by PBSW and
psychologists benefitted from the relationships staff had developed with long term
prisoners. As a result, assessments and reports reflected cooperative
inter-disciplinary working and were informed by the views and experiences of
prisoners. 
Good practice 10: The co-location of Interventions, Psychology and PBSW
teams enabled opportunities for case discussion and reflection which in turn
ensured that there was a good understanding of each other’s roles. 
Recommendation 37: SPS HQ should consider whether there should be more
emphasis placed on Personal Officer work during officers initial training at the
SPS college. 
7.3 Where prisoners have been engaged in development or treatment
programmes during their sentence, the prison takes appropriate action to
enable them to continue or reinforce the programme on their return to the
community. 
Rating:  Satisfactory 
General Programme Assessments (GPAs) continued to be undertaken by
psychology staff throughout the pandemic to determine access to the most
appropriate programmes. Where specialised assessments were identified as
appropriate, for example domestic abuse convictions, these were completed. There
was recognition by the programmes team and prison-based social work of limited
capacity to complete level of service/case management inventory (LS/CMI)
assessments to inform the PCMB. 
Staff were ambitious for the further development of a broader range of interventions.
Building on what existed to address addictions and increasing the availability and
accessibility of counselling for loss and experience of trauma.  The programme
delivery team were also piloting a programme which included a focus on addressing
domestic abuse. These were encouraging developments. 
Prisoners were not confident about the continuity of access to programmes when
returning to the community.  Prisoners were frustrated by the waiting list to access
national programmes and the detrimental impact this lack of access had on
progression. The programmes team were proactively seeking solutions to this issue.

Page 98

85 
Good Practice 11:  HMP Shotts prioritised the resumption of programme
delivery following the lockdown and the programme delivery team was
innovating to improve the content of existing programmes. 
7.4 All prisoners have the opportunity to contribute to a co-ordinated plan
which prepares them for release and addresses their specific community
integration needs and requirements. 
Rating: Generally acceptable 
The ICM system was well established with a clear focus on identifying and meeting
the needs of individual prisoners.  Staff responsible for the operation of ICMs made
effective arrangements to promote the involvement of all prisoners and, where
appropriate, family members, although the attendance by family members was low.
The central focus of the ICM on the prisoner, meant they were encouraged and
supported to voice their views. 
While there is an expectation that prisoners are supported by POs, this was not
always happening. There were challenges due to rostering and in the timely
completion of reports and updates to Community integration plans (CIPs). The
regime, whereby most prisoners were locked up after tea time, did allow for PO work
to be carried out but a lack of training is a concern.  New POs rely on more
experienced POs to learn from which is not always the most effective way of
learning. 
Information sharing between PBSW and CBSW was effective in co-ordinating plans
for release.  Given the prison accommodated prisoners from all over the country,
there was an emphasis on the role of CBSW in identifying and arranging appropriate
community supports and involving them in planning where relevant. 
There was a concerted effort to provide access to drug and alcohol interventions
within the prison.  Appropriate oversight was provided by a group of multi-agency
statutory partners. 
Some prisoners due for release from the prison lacked confidence about important
parts of their integration plans, especially housing options and access to mental
health support. None had been given any formal opportunity to develop key life skills
as part of preparation for release during their sentence. 
Recommendation 38:  HMP Shotts should improve consistency in the role
played by POs supporting individuals, including attendance at pre-release ICM
meetings and ongoing time with prisoners prior to release.  This will promote
the confidence of prisoners in the plans for their release. 
Recommendation 39:  HMP Shotts should explore the delivery of a formal ‘life
skills’ learning opportunity to help to prepare prisoners for the significant
transition from custody to the community.

Page 99

86 
7.5 Where the prison offers any services to prisoners after their release,
those services are well planned and effectively supervised. 
Rating: Generally acceptable 
The prison did not offer any services to prisoners after their release. 
No information was being gathered on progress and outcomes after release to
inform any future developments. 
Prior to release efforts were made to help prisoners engage with services to support
transition to the community on release.  This was usually coordinated by CBSW and
link centre staff based on needs identified in the pre-release ICM meeting.  Other
external agencies attended these meetings where relevant, including representatives
from housing or accommodation providers. 
Link centre staff responded directly to the needs of prisoners on an individual basis,
including in relation to finances and welfare rights issues.  There were limited
examples of external agencies looking to establish a routine presence in the prison
to build relationships with prisoners to support the transition from custody to the
community. 
Recommendation 40: HMP Shotts should explore opportunities to gather
evidence on the progress and outcomes for individuals liberated from the prison
to inform service delivery and support continuous improvement.  This will help
to ensure that prisoners benefit from evidence-based approaches to the
successful return of individuals from custody to the community.

Page 100

87 
STANDARD 8 - ORGANISATIONAL EFFECTIVENESS 
The prison’s priorities are consistent with the achievement of these Standards and
are clearly communicated to all staff. There is a shared commitment by all people
working in the prison to co-operate constructively to deliver these priorities. 
Staff understand how their work contributes directly to the achievement of the
prison’s priorities. The prison management team shows leadership in
deploying its resources effectively to achieve improved performance. It
ensures that staff have the skills necessary to perform their roles well.  All
staff work well with others in the prison and with agencies which provide
services to prisoners.  The prison works collaboratively and professionally
with other prisons and other criminal justice organisations. 
Inspection Findings 
Overall Rating:  Generally acceptable Performance 
In this standard, four quality indicators were rated as satisfactory performance, three
were rated as generally acceptable performance, and one was rated as poor
performance giving an overall rating of generally acceptable. There were
three recommendations for improvement. 
With only one exception, performance against the quality indicators in this standard
was either fully satisfactory or generally acceptable with sufficient evidence of
competence against some elements of the quality indicator to not cause concern.
For example, there was clear evidence of appropriate action in response to our
previous recommendations and sound business planning processes.  Staff were
clear on their roles and what was expected of them and planning to deal with
vacancies and staff absences was robust, whilst still being compassionate.
Compliance with core competency training requirements had suffered significantly as
a result of the pandemic, but the issue was being gripped effectively by the new
Learning and Development Manager. 
The main concern was the lack of a structured plan for assessing how the prison
operated in relation to its Equality and Diversity (E&D) obligations.  The prison would
also benefit from more detailed statistical monitoring to safeguard against
unintentional bias in the operation of systems affecting employment and educational
opportunities or responses to complaints and prisoner indiscipline. 
While the GIC had helpfully begun a process of engagement with unit managers and
some of the people who reported to them, we encourage further efforts to
consolidate communication and engagement with front line staff.  There is also a
need to ensure managers give greater priority to the completion of staff appraisals. 
In terms of the PANEL principles for this Standard: 
Participation. The suspension of PIACs during the majority of the pandemic
was disappointing as it significantly restricted the ability of prisoners to
contribute to any discussion or decision making about the running of the prison

Page 101

88 
regime. While the need to comply with COVID-19 related guidance around
social distancing, etc., is fully recognised, there were parts of the prison where
PIACs could have been held in line with Public Health Scotland guidance. 
Accountability.  To their credit, the prison had unquestionably taken decisive
action to address the areas of poor performance identified in the previous
HMIPS inspection report. Understandably staff training to support their roles
within the prison and maintain core competency had been significantly
impacted by the pandemic. The prison estimated it would take a year to
achieve full compliance again with core training which was a concern,
particularly in relation to control and restraint procedures, but the prison had a
clear plan for addressing that. 
Non-discrimination and equality. While the prison spoke eloquently of what
it had done before the pandemic to promote Equality and Diversity, the lack of
any up to date structured plan to assess and promote E&D at the time of our
inspection was a major concern.  It is imperative that the whole agenda around
E&D is swiftly re-energised. 
Empowerment. While staff-prisoner relationships were witnessed by
inspectors as positive and respectful throughout the prison, the length of the
gap in the running of any PIAC during the pandemic left a concern about the
commitment to empower prisoners to participate and claim their entitlements.
Without an effective system of PIACs and focus groups it is difficult to see how
prisoners can feel that their voice matters.  Nevertheless, at the time of our
inspection PIACs had begun to be re-established. 
Legality.  There were no issues in relation to this standard regarding upholding
the legal rights of prisoners as set out in domestic and international laws. 
Encouraging observations 
 Respectful staff – prisoner relationships, with motivated committed staff.
 The swift and effective response by management to investigating and
responding to some issues raised by inspectors during the inspection and clear
evidence of action to address previous inspection recommendations. 
Emerging concerns 
 The lack of a structured plan for assessing the extent to which the prison
currently meets its E&D obligations and where improvements are necessary.
 Difficulties achieving core training competency levels due to operational
restrictions posed by the pandemic.
 The loss of opportunities for prisoners to inform or influence decision making
during the pandemic when PIACs were suspended.
 The need to improve communication and engagement with front line staff,
building on recent helpful initiatives by the GIC.
 Poor completion rates for staff appraisals in 2020-21.
 Recent tensions between the trade union side and the management team,
although relationships appeared to be improving at the time of our inspection

Page 102

89 
 The Senior Management Team (SMT) and a number of management posts
below that had been occupied on a temporary promotion basis for over two
years.

Page 103

90 
Quality Indicators 
8.1 The prison’s Equality and Diversity Strategy meets the legal
requirements of all groups of prisoners, including those with protected
characteristics. Staff understand and play an active role in implementing the
Strategy. 
Rating:  Poor 
COVID-19 and a reorganisation within the management team as a result of a
medical retirement had impacted on efforts to promote and safeguard Equality and
Diversity (E&D).  The prison was able to talk about constructive partnership working
developed in the past with Alzheimers Scotland, previous themed events in the
prison and local training previously delivered on E&D, but action had paused
completely during the pandemic and the prison was only just starting to re-engage
with the agenda. 
At the time of the inspection the first meeting of a new operational E&D group had
taken place, but no local E&D Strategy or Action Plan had been developed.  Monthly
meetings of the operational E&D group were planned, along with quarterly meetings
with the Governor with a more strategic focus on E&D. 
The E&D Manager was only covering the role on a temporary basis resulting in the
lack of a dedicated resource with appropriate specific training or experience around
Equality & Diversity.  The prison would benefit from conducting more systematic
monitoring of data around opportunities for those with protected characteristics, and
their involvement in disciplinary processes, relative to other prisoner groups to
ensure no unintentional discrimination was occurring. 
Recommendation 41: HMP Shotts should prioritise re-energising the E&D
agenda, including regular meetings of the E&D committee with prisoner
representation, development of an E&D action plan, more systematic
monitoring of data to avoid unintentional bias with employment, education and
discipline, etc., and provide comprehensive training for the E&D Manager. 
8.2 Appropriate action has been taken in response to recommendations of
oversight and scrutiny authorities that have reported on the performance of
the prison. 
Rating:  Satisfactory 
The SPS and NHS prison healthcare teams were clear on the areas where
performance improvements had to be prioritised after the previous HMIPS 2017
inspection report, and good progress had been made in several areas.  Inspectors
were pleased to see significant improvements had been achieved in relation to the
range of educational opportunities and activities and development of the library.
Inspectors also welcomed a notable improvement in mental health support since the
last inspection.

Page 104

91 
The prison conducted PRL audits on a systematic basis and there was also evidence
of the prison responding to audit and assurance exercises carried out by SPS HQ.
The reliability of some of the findings in these PRL audits might be questioned,
however, as the one on E&D had provided substantial assurance, which did not tally
with our own inspection. 
8.3 The prison successfully implements plans to improve performance
against these Standards, and the management team make regular and
effective use of information to do so.  Management give clear leadership and
communicate the prison’s priorities effectively. 
Rating:  Satisfactory 
The prison had a clear business plan based around five core themes of
development, engagement, impact, standards and collaboration.  Progress against
the plan was carefully tracked and recorded, with clarity around which tasks had
been completed and where slippage against the original envisaged timetable had
occurred. Monthly business planning meetings provided a forum for discussing
progress. 
Staff had been given the opportunity to input into the 2019/20 business planning
process, but the pandemic had interfered with that process for systematic
engagement. The prison intended to reinstate the engagement process for the next
round of business planning. 
The GIC had recently started a series of engagement sessions with Unit Managers,
who were encouraged to bring in some of their own direct reports for an open
discussion on where and how improvement could be made.  There was also a
weekly meeting of FLMs every Monday and roster meetings every Wednesday.  A
brief was also emailed to all staff every month which provided an update on action in
response to issues raised by staff.  Despite these forums for engagement and
communication, front line staff often criticised a lack of communication from
management or what they perceived as late communication.  Although this seemed
to relate partly to changes in guidance around COVID-19 from Public Health
Scotland, which the management team were obliged to implement without delay,
there was evidence of the value of further strengthening communication with front
line staff. 
We were concerned, however, that the Senior Management Team (SMT) and a
number of management posts below that, had been occupied on a temporary
promotion basis for over two years; this was not conducive to stability and longer
term planning so we urge the SPS to secure some more permanent arrangements
as soon as possible. 
Recommendation 42: The GIC should build on recent efforts to improve
communications and engagement with staff, particularly with front line staff.
Face-to-face discussions with larger groups of staff would be helpful.

Page 105

92 
8.4 Staff are clear about the contribution they are expected to make to the
priorities of the prison, and are trained to fulfil the requirements of their role.
Succession and development training plans are in place. 
Rating:  Generally acceptable 
Staff were clear about their roles and the contribution they were expected to make to
the prison’s priorities, but regimes staff in particular found it hard having to cover for
the absence of residential staff as it was more difficult for them to answer prisoners’
queries.  Despite frustrations for some staff around being pulled away from their
specialised functions, most staff expressed a strong commitment and motivation to
their roles within the prison. 
Contingency plans for a range of potential issues were in place within the prison and
there was regular and robust monitoring of anticipated vacancies and those
expected to return to work to inform planned recruitment needs.  Management also
understood the issues they faced in managing succession issues within the prison.
They were acutely aware, for instance, of the number of staff who were moving
towards retirement age in the next few years and of the high number of individuals
acting up at different levels within the organisation.  They had plans in place to bring
longer term stability to the staffing structure, but their planning was to some extent
dependent on decisions elsewhere or national recruitment by SPS HQ. 
The prison had an overall record of 78% compliance for core competency training,
with significantly lower compliance rates around Personal Protection Training, C&R,
Fire Response Procedures and Emergency Response.  Although still new to the
post, the prison’s new Learning and Development Manager had a strong grip on
these training priorities such as the need to focus on C&R training.  COVID-19
restrictions during the pandemic had necessitated a lengthy pause in C&R training,
and the prison estimated that it would take a year to recover due to limitations posed
by the Training Variable and the challenges in securing staff availability.  This was a
concern, particularly in relation to the limited number of staff still in competency to
conduct planned removals and other C&R processes. 
More positively the Learning and Development Manager was committed to
embedding control and monitoring of training around the MyLo system, with the aim
of ensuring that the principal responsibility for meeting training requirements rested
more clearly with individuals and their line managers. 
Awareness raising and informal mentoring and shadowing opportunities to support
those seeking promotion were in place, but a more structured approach might be
beneficial. 
8.5 Staff at all levels and in each functional staff group understand and
respect the value of work undertaken by others. 
Rating:  Generally acceptable 
The staffing challenges posed by COVID-19 related absences often required
regimes staff to temporarily suspend their work parties and help their residential staff

Page 106

93 
colleagues. Although it was difficult for regimes staff to fill in for residential staff, they
accepted the need to do so and this helped facilitate recognition of respective roles
and challenges. Front line SPS and NHS staff were required to work effectively
together on a daily basis and again there was generally a respectful recognition of
respective roles and shared challenges.  The GIC and Deputy Governor took
opportunities to rotate individuals into different roles to widen experience and support
respect for the work of others. 
However, before the inspection there had been significant tensions in the
relationship between the GIC and the local trade union representatives over a
number of important issues which had clearly been difficult for all involved and which
had contributed to some significant instability prior to our inspection. It was
encouraging therefore to hear both the GIC and the trade union representatives
suggest that relationships had started to improve, and we hope that continues. 
8.6 Good performance at work is recognised by the prison in ways that are
valued by staff. Effective steps are taken to remedy inappropriate behaviour
or poor performance. 
Rating:  Generally acceptable 
The prison had a robust but caring approach to managing staff absences,
implementing return to work interviews and monitoring absences effectively.  The
total number of staff absences had reduced from 93 at Christmas 2021 to 27 at the
time of our inspection, which was encouraging. 
The Staff Recognition Committee chaired by the HR Manager with representation
from across the prison encouraged and discussed nominations for Governor awards.
Individuals chosen by the Governor to receive such an award were given the choice
on whether they wished to be presented with the award in front of their peers or
preferred to receive the award in private.  It was pleasing to see the Staff
Recognition noticeboard refreshed with more recent photographs during the course
of our inspection. A medal was presented to all staff reaching 20 years’ service and
inspectors welcomed the establishment of an Achievement Tree with the names of
those staff with 25 years’ service engraved on metal leaves. 
However, even recognising the exceptional additional challenges posed for the
prison by the pandemic, it was disappointing to see that the completion rate for staff
appraisals for 2020-21 was only 46%, despite evidence of reminders being sent.
Inspectors hope that with COVID pressures now receding, management at all levels
will now give the completion of staff appraisals the priority it deserves. 
Recommendation 43: HMP Shotts should give greater priority to the
completion of staff appraisals, ensuring improved completion rates for 2021-22
and future years.

Page 107

94 
8.7 The prison is effective in fostering supportive working relationships with
other parts of the prison service and the wider justice system, including
organisations working in partnership to support prisoners and provide
services during custody or on release. 
Rating:  Satisfactory 
The GIC contributed to the Criminal Justice Partnerships for North and South
Lanarkshire and West Lothian, but Shotts acts as a national facility with prisoners
often returning to a local prison prior to liberation; it simply wouldn’t be possible for
the GIC to attend all community justice partnerships across the country.  However,
the prison worked alongside Police Scotland and MAPPA colleagues as required
around public protection issues. It also supported the work of the Addictions Drugs
Partnership for Lanarkshire, contributing specifically around drug related deaths and
consideration of what more could be done within the prison and local community to
reduce risks. 
At the time of the inspection the prison was exploring a range of initiatives to provide
for those in their care such as Street Soccer and Street Cones.  The prison hoped to
bring the Metro Big Band to HMP Shotts, when they appeared at the Edinburgh
Fringe, and to renew their previously successful partnership with Alzheimers
Scotland to build on the work that had been suspended during COVID-19.  A lot of
these initiatives were at a very early stage at the time of our inspection, but it was
encouraging to hear discussion of them as part of the planned recovery from
COVID-19. 
8.8 The prison is effective in communicating its work to the public and in
maintaining constructive relationships with local and national media. 
Rating:  Satisfactory 
As with other prisons, most media issues were dealt with by the national
communications team within SPS HQ.  However, the GIC had taken part in a
recently aired BBC Scotland TV programme “My Kind of Town” partly to explain the
importance of the prison within the local community. 
A local community group GBTS operated within the HMP Shotts Visitor Centre, and
the prison management team appreciated the contribution they made to family visits
and the successful running of themed events for prisoners and families.

Page 108

95 
STANDARD 9 - HEALTH AND WELLBEING 
The prison takes all reasonable steps to ensure the health and wellbeing of all
prisoners. 
All prisoners receive care and treatment which takes account of all relevant
NHS standards, guidelines and evidence-based treatments.  Healthcare
professionals play an effective role in preventing harm associated with prison
life and in promoting the health and wellbeing of all prisoners. 
Inspection Findings 
Overall rating:  Poor 
In this standard, five quality indicators were rated as satisfactory, six were rated as
generally acceptable and five were rated as poor, giving an overall rating of poor.
This grading is reflective of the significant and sustained pressures on staff and the
detrimental impact on patients receiving care.  This is not a reflection of the
considerable efforts made by staff within HMP Shotts or the North Lanarkshire
Health and Social Care Partnership (HSCP) to support the healthcare needs of
patients in HMP Shotts. 
There were 12 examples of good practice and 22 recommendations for
improvement. 
The Healthcare Team had experienced significant and sustained staff shortages
across all disciplines.  Continued staff shortages had impacted on the team’s ability
to provide adequate staffing and maintain a safe skill mix on some occasions.  As
described in the escalation below and in QI 9.2 and QI 9.6, there was no GP cover
after 1.30pm.  As a direct result of absences within the Senior Leadership team, staff
reported they were not receiving one to one support or clinical supervision in any
consistent pattern. Staff morale was low and staff were reporting fatigue.  The
fragility in the workforce was a significant concern and was escalated during the
inspection. Senior managers were aware of the ongoing challenges for staff in
HMP Shotts.  Inspectors were provided with evidence of the service model review
commissioned by senior management from North Lanarkshire HSCP. 
The lack of medical cover was impacting on the ability to provide long-term condition
management of patients.  All patients’ records are kept in the electronic Vision
patient record system. It was not clear how staff were using the full function of this
system effectively to collect data for patients with long-term health conditions.  These
factors have led to a systematic failure to deliver long-term condition reviews and
oversight. 
The clinical pharmacy role was not patient facing and was not shown to be
accessible for the population of HMP Shotts to discuss their medications with a
member of the Pharmacy Team.  This was not equitable to what is provided within
the community in NHS Lanarkshire and is a concern.  North Lanarkshire’s HSCP
must action the recommendations made in their service review regarding pharmacy
provision and support as a matter of priority.  It was not clear how the Pharmacy

Page 109

96 
Team links to the NHS Lanarkshire Pharmacy Service for professional support and
development.  Our clinical partner’s discussion with the pharmacy adviser identified
challenges with building effective working relationships with GPs to improve
prescribing practices and the potential to develop multi-disciplinary team (MDT)
working to improve patient outcomes. 
Registered nurses had the responsibility of reviewing complaints.  There was no
evidence as to whether staff had received training on how to review, respond and
escalate complaints. Whilst staff had the opportunity to have informal discussions
between themselves about complaints, there was no formal process in place to
share learning from complaints.  Inspectors were told that staff meetings were not
taking place at the time of our inspection due to staffing shortages 
Inspectors were told that secondary care appointments were being sent by post
because of issues with the IT systems in HMP Shotts, which presented a significant
data risk.  Inspectors were informed, during the inspection, that practice had
changed and all referrals to secondary care were being managed electronically,
directly to the NHS board, and postal referrals would be stopped. Inspectors will
follow this up as part of their revisit. 
Escalation 
During the inspection, gaps were identified in senior clinical staffing resource during
periods of the day, with no GP cover provided between 1:30 pm and 6pm. GP cover
was provided in the health centre in the mornings and after 6pm, on-call GP facilities
were available.  This was highlighted during the previous inspection in 2017.  Further
to this, there were only two Band 5 Registered General Nurses (RGNs) on shift from
3:30pm until 6pm to undertake clinical duties, such as medication rounds and attend
emergency calls (code red/code blue). 
Emerging concerns: 
 The prison is open to activities during 3:30pm until 6pm and therefore there is an
increased risk of incidents.
 There is no clear mechanism for the Band 5 RGNs to discuss concerns, or get
support around clinical decision making for deteriorating patients during this
period of time.
 Contacting the Scottish Ambulance Service for emergency response is the
default position, as there is no other way to obtain measurable clinical advice. 
It was important to note that following a restructure and changes in both leadership
and responsibility of prisoner healthcare.  In response to North Lanarkshire’s HSCP
identifying underlying challenges in healthcare delivery, a service model review of
HMP Shotts was carried out in March 2022 and an action plan was developed.
Inspectors reviewed both the service review and action plan provided and were
encouraged to see many of the issues identified throughout the inspection and
planned improvements. These had been assigned senior leadership, however were
yet to have identified timelines.  At the time of the inspection, we were not fully
assured that all risks were being safely managed. Interim measures were needed to
reduce potential risks, support staff and maintain the safety of the patients.

Page 110

97 
We asked the Partnership to urgently review the service provision between 1.30pm
and 6pm; identifying what clinical services and support is required to ensure the health
needs of the prison population is equable with the community. 
We have escalated the above concerns internally within Healthcare Improvement
Scotland and with the Clinical Service Manager for HMP Shotts and advised that we
would be formally escalating these concerns to the North Lanarkshire Health & Social
Care Partnership, NHS Chief Executive and SPS Chief Executive. These are outlined
in QI 9.2, QI 9.6, QI 9.8 and QI 9.16. 
Primary care 
Patients could self-refer to healthcare services within the prison using a confidential
self-referral system.  Referral forms were available in the residential areas, with
some in picture format.  Self-referral forms were collected daily from a locked box by
healthcare staff and then triaged to the appropriate service.  GPs were available
each day until 1:30pm in HMP Shotts.  However, no medical cover was provided
from 1.30pm to 6pm until the out of hours’ service became available at 6pm. The
absence of medical cover during these times is a significant risk for patients and
staff. Healthcare staffing was also reduced from 3:30pm. The variable levels of GP
cover within the establishment was raised as a concern and were escalated during
the inspection. Inspectors were told that patients would be seen by a GP within
two weeks, or by a nurse within two days, depending on the medical need. 
After a patient was reviewed by nursing staff, inspectors observed the nurse record
notes in the Vision system. Inspectors saw that a standard Situation background
assessment recommendation (SBAR) approach to record keeping was generally
used. However, the level of detail that was included varied. 
Mental Health 
There were processes in place on transfer to prison to identify patients requiring
access to mental health services A referral system was open to all staff and self-
referrals.  Patients were triaged daily and followed up based on the level of urgency.
At the time of inspection patients were waiting up to 6 weeks, urgent referrals could
be seen within 72 hours if required. 
A multi-disciplinary meeting took place weekly between the Mental Health and
Addictions Team discussing number of areas including; patients currently on Talk to
Me, hospital referrals, upcoming liberations (including follow up arrangements), Care
Programme Approach (CPA) plans for patients returning from hospital and waiting
times for each discipline. There was evidence of liaison with Community Mental
Health Teams (CMHT) pre-liberation and attendance at prisons suicide prevention
strategy Talk to Me (TTM) case conferences.  This was shared with primary care
outside of mental health nursing hours.  Psychiatry clinics took place regularly and
urgent requests for consultations were responded to. 
Improvements were evident, since the last inspection, based on the introduction of
standardised assessment tools which was not previously in place. However, North
Lanarkshire HSCP should introduce an electronic system to record and update

Page 111

98 
documents to keep documents live and ensure the most up to date information is
accessible. 
There was no process in place for accessing specialist support in intellectual
disabilities, autistic spectrum disorder, neuropsychiatric disorders and cognitive
impairment. 
Substance misuse 
Individuals requiring support with drug and alcohol dependence were identified
during their initial health assessment on transfer to the prison.  A process was in
place for patients who were receiving Opiate Substitution Therapy (OST) to continue
their treatment upon transfer.  Psychological support was available to patients in
several forms.  There was evidence of collaborative working and clear
communication between SPS and the Addictions Team. This was through the
multidisciplinary Substance Misuse Group which gave opportunities to discuss
prisoners who may benefit from support from the Addictions Team.  There was a
discharge planning process in place to ensure continuity of care for those patients
preparing for liberation.  Harm reduction sessions were available to patients due to
be liberated covering CPR training, overdose prevention and use of injectable
naloxone. 
Person centred care plans are in place with evidence of patient involvement.
However, there were some limitations in regards to patient choice of OST due to the
HSCP awaiting allocation of funding. Senior management were following this up at
the time of the inspection. 
Long-term conditions, palliative and end of life care 
Inspectors saw that admission screening identifies patients with long-term health
conditions.  However, it was not clear what follow up of long-term health conditions
was in place or how this informed care planning.  This is a significant concern.  No
long-term condition clinics or annual reviews were taking place at the time of
inspection in HMP Shotts. 
A standardised national assessment tool, Supportive and Palliative Care Indicators
Tool (SPICT) was in place in HMP Shotts to assess both palliative and end of life
care needs. Palliative care, when required, was delivered in conjunction with both
NHS and SPS. Development of Anticipatory Care Plans (ACPs) had been
compromised by the pandemic and competing staffing priorities.  However,
continued work with St Andrews Hospice was identified as a priority for healthcare
staff in HMP Shotts to continue to develop the work around ACPs and attendance at
the Macmillan Palliative Care Team in custody group. 
All patients assessed on admission who had an identified life-limiting illness were
added to the palliative care register and Anticipatory Care Plans (ACPs) were put in
place. The electronically available ACPs were reviewed on an ongoing basis and
were owned by the patient.  Inspectors saw evidence of these for some patients with
long-term conditions during the inspection.

Page 112

99 
Infection, prevention and control 
All areas, where healthcare was delivered, were in a good state of repair and were
clean and ready for use.  During the inspection, inspectors found the clinical
equipment was clean and ready for use and completed cleaning schedules were
available for review. Inspectors saw evidence of a rolling programme of audits in
place. Staff were knowledgeable regarding standard infection control precautions
and had adequate supplies of PPE.  The cleaning resource provided was sufficient
and cleanliness was of a good standard. 
Encouraging observations 
 Patients receive information at admission identifying services that are available to
them regarding healthcare and how to refer to these services.
 Where secondary care appointments were missed, the GP triaged these
appointments so that the most clinically urgent were prioritised to be rescheduled.
 Healthcare and SPS staff worked collaboratively to provide transport for these
clinically urgent appointments with GEOAmey to support this.
 Prisoner information channel used to share health promotion notices including a
podcast with information on oral health, mental health support and a mindfulness
group which was run by psychology.
 Links with education department delivering heart health course and mental health
stigma workshop.
 An emotional resource group facilitated by psychology was piloted within the
prison with positive feedback received.  The group focussed on supporting
prisoners to improve their awareness, recognition and regulation of difficult
emotions.
 At the request of SPS, psychology recently started facilitating drop in support
sessions following adverse events within the prison.  The sessions focus on
psychoeducation and signposting to services to provide support to those who
may have witnessed a traumatic incident or be emotionally impacted by an
adverse event.
 A multidisciplinary substance misuse group has recently been restarted; the
Addictions Team and SPS staff meet monthly to discuss any prisoners who may
benefit from input from the Addictions Team.
 Anti-bacterial hand sanitisers were available and a system in place to
decontaminate the boxes used for personal belongings at security for visitors to
HMP Shotts.
 A newsletter is produced from the daily huddles which would include any
changes to guidance to be shared with staff.
 The daily huddle was used as a mechanism to RAG rate staffing insufficiencies
and seek solutions amongst other patient centred discussions.
 In response to identification of underlying challenges in healthcare delivery a
Service Model Review of HMP Shotts was carried out in March 2022 and an
action plan was developed. HIS inspectors will look for evidence of
implementation of this action plan in future inspections.

Page 113

100 
Emerging concerns 
 North Lanarkshire HSCP must ensure that all prisoners transferred to HMP
Shotts are reviewed by a nurse before being admitted into the prison.
 North Lanarkshire HSCP must develop a pathway to ensure patients receive
psychiatry follow up when transferred.
 National co-ordination and discussion with partner agencies (such as Police
Scotland, Scottish Courts, GEOAmey and SPS) is required to ensure that people
arrive at the prison during the prison’s core opening times or when nursing
resource is available.
 North Lanarkshire HSCP must provide a room that is clean and clutter free at
reception.
 North Lanarkshire HSCP must revise without delay, the process in place when
identifying long term health conditions and provide assurance that patients are
reviewed in line with what is equitable in the community to address health
inequalities.
 North Lanarkshire HSCP must implement a system for secondary care referrals
that ensures patient confidentiality is protected.
 North Lanarkshire HSCP must ensure that all eligible patients who wish to be
involved in national screening programmes are supported to do so and that this is
clearly documented in the patients VISON record.
 North Lanarkshire HSCP must ensure that checks on emergency equipment are
carried out within the agreed timeframe and that these checks are clearly
recorded.
 North Lanarkshire HSCP as a matter of urgency must review the medical cover
available in the afternoons to -
(i) ensure the risk to patients is reduced.
(ii) support nursing staff in dealing with emergency situations.
 North Lanarkshire HSCP must ensure that patients are able to access national
screening programmes in line with community provision and keep accurate
records of attendance.
 North Lanarkshire HSCP must introduce an electronic system to record and
update documents to keep documents live and ensure the most up to date
information is accessible.
 North Lanarkshire HSCP must develop a pathway for accessing specialist
support in intellectual disabilities, autistic spectrum disorder, neuropsychiatric
disorders and cognitive impairment.
 North Lanarkshire HSCP must ensure that person centred care plans and
appropriate risk assessments are in place for all patients with long-term
conditions and that these are reviewed regularly.
 As a priority North Lanarkshire’s HSCP must action the recommendations made
in their service review regarding pharmacy provision and support to provide a
service equitable with the community.
 NHS Lanarkshire’s pharmacy service must provide structured and regular
support to staff involved in supporting pharmacy services within HMP Shotts.
 North Lanarkshire HSCP and SPS must seek solutions to assist staff to
administer medication at a suitable and therapeutic time.
 NHS Lanarkshire HSCP should consider the reintroduction of the oral health
educator role to support the dental service.

Page 114

101 
 NHS Lanarkshire HSCP and SPS must ensure complaints forms are available in
alternative formats and languages to ensure all patients can provide feedback,
raise concerns and complain.
 NHS Lanarkshire HSCP must ensure that all staff managing complaints receive
training to ensure that all complaints are correctly managed.
 NHS Lanarkshire HSCP should develop a process to discuss complaints to share
learning and identify any themes or required improvements.
 NHS Lanarkshire HSCP must ensure that alternative and consistent IT solutions
are provided to support clinical staff as referrals by post is a significant data
breach.
 North Lanarkshire HSCP must demonstrate implementation of recommendations
from service review and provide clear pathways to support staff on site in HMP
Shotts in the absence of senior staff.

Page 115

102 
Quality Indicators 
9.1 An assessment of the individual’s immediate health and wellbeing is
undertaken as part of the admission process to inform care planning. 
Rating:  Generally acceptable performance 
HMP Shotts receives prisoners who are transferred from other prisons. All prisoners
should receive a healthcare assessment by a nurse prior to being admitted into the
prison. However, inspectors were told that some prisoners were not assessed until
the following day due to staffing and workload pressures.  During the inspection,
inspectors observed the admission process. The immediate health and wellbeing
needs of patients were identified on arrival by a registered nurse. Nursing staff used
a standard health screening tool to carry out the process. Staff were observed to
ensure the patient’s dignity and confidentiality was maintained throughout their
health screening. 
Good systems and processes were in place to ensure that all the patient’s
healthcare needs were identified during the screening assessment.  These were
documented in the Vision patient record system and shared with the appropriate
Healthcare Teams. Inspectors were made aware that not all patients requiring
psychiatry support intervention had been followed up.  This is a concern.
Inspectors were told work was being undertaken to develop a pathway to ensure
early identification of patients requiring follow up. Inspectors will review the progress
of this work. 
Patients receive information at admission identifying services that are available to
them regarding healthcare and how to refer to these services. This is good
practice. 
Patients identified as requiring to see the GP are reviewed the following day.
Medicines reconciliation takes place the following day by the GP and all drugs are
prescribed onto the patient’s medication administration record (Kardex). 
Anyone identified as being at risk of self-harm or suicide is managed in line with the
prison’s suicide prevention strategy; TTM. People coming into prison should be
assessed for risk of self-harm. However, this system does not work when prisoners
are transferred into HMP Shotts after 6pm. This is a significant concern for prisoners
as there was no nursing cover provided after this time.  During the inspection,
inspectors were provided with details of the number of prisoners who had been
admitted after 6pm during the period from May 2021 to May 2022. All prisoner
transfers were facilitated by GEOAmey. 
While the room used for screening provided a confidential space, it was cluttered
and had been identified in previous reports as being unfit for purpose.  HMP Shotts
must provide a room that is clean and clutter free to enable access to the hand
washing facilities.

Page 116

103 
Inspectors saw that systems and processes were in place to identify any patient unfit
to be detained in prison, and appropriate actions were taken to maintain the safety of
these patients. 
Recommendation 44: North Lanarkshire HSCP must ensure that all prisoners
transferred to HMP Shotts are reviewed by a nurse before being admitted into
the prison. 
Recommendation 45: North Lanarkshire HSCP must develop a pathway to
ensure patients receive psychiatry follow up when transferred. 
Recommendation 46: National co-ordination and discussion with partner
agencies (such as Police Scotland, Scottish Courts, GEOAmey and SPS) is
required to ensure that people arrive at the prison during the prison’s core
opening times or when nursing resource is available. 
Recommendation 47: North Lanarkshire HSCP must provide a room that is
clean and clutter free at reception. 
Good practice 12:  Patients receive information at admission identifying
services that are available to them regarding healthcare and how to refer to
these services. 
9.2 The individual’s healthcare needs are assessed and addressed
throughout the individual’s stay in prison. 
Rating: Generally acceptable performance 
Following their initial health screening assessment, the patient’s medical history and
prescribed medication was reviewed by a GP. The outcome of the assessment was
recorded onto the patient’s Vision care record. 
Inspectors were told that, as part of the admission process, prisoners were provided
with a pack that contained information about healthcare services available at
HMP Shotts.  Healthcare information was also displayed in the residential areas.
Patients could self-refer to healthcare using a confidential self-referral system.
Referral forms were available in the residential areas, with some in picture format.
Self-referral forms were collected from a locked box by healthcare staff and then
triaged to the appropriate service.  Patients not seen in the residential areas that
day, after having their referrals triaged, were given letters to let them know their
appointment time. Inspectors were told that patients would be seen by a GP within
two weeks, or by a nurse within two days, depending on the medical need. 
After a patient was reviewed by nursing staff, inspectors observed the nurse
recorded notes in Vision.  Inspectors saw that a standard SBAR approach to record
keeping was generally used. However, the level of detail that was included varied. 
Inspectors saw that admission screening identifies patients with long-term health
conditions.  However, it was not clear what follow up of long-term health conditions
was in place or how this informed care planning.  This is a significant concern, as

Page 117

104 
there was no process in place to provide follow up or review of long term health
conditions in line with community provision. 
Near Me (a video calling system that allows patients to attend appointments
remotely) was in place for secondary care appointments.  Patients going out of
prison to attend any external appointments were supported by GEOAmey. Where
secondary care appointments were missed, the GP triaged these so that the most
clinically urgent appointments were prioritised to be rescheduled.  This is good
practice.  Inspectors were told that healthcare and SPS staff worked collaboratively
to provide transport for these clinically urgent appointments with GEOAmey to
support this. This is good practice.  Patients who missed their secondary care
appointments were issued with a letter from the health centre to confirm the
appointment would be rescheduled. 
Referrals to secondary care were in paper format and posted to the appropriate
specialist service. This is a significant concern. Inspectors discussed the risks to
patient confidentiality with this process with healthcare staff.  During the inspection,
the staff implemented a temporary process so that referrals will now be emailed
securely and told inspectors that they will continue to look for more permanent
solution. 
Inspectors were told that patients eligible for national screening programmes like
bowel and abdominal aortic aneurysm screening would be supported to participate in
these.  However, inspectors could not find clear evidence in a patient’s Vision care
record that this had happened. 
Patients who required social care to support them with their personal care needs,
were provided access to this through an external care company. SPS can refer to
this service and it was reported to be working well.  There was also a clear process
for healthcare staff to refer patients to occupational therapy, where assistive
equipment was required to help support their care needs. 
Emergency equipment was in place and was found to be well maintained and
organised. Emergency medication was found to be in date. Emergency equipment
should be checked weekly. However, inspectors found that although equipment
checks were being regularly carried out, this was not consistently recorded.
Inspectors discussed this with staff to ensure that equipment checks are recorded
consistently and evidence compliance with this. 
GPs were available each day until 1.30pm in HMP Shotts, however, no medical
cover was provided from 1.30pm to 6pm until the out of hours’ service became
available at 6pm. The absence of medical cover during these times is a significant
risk for patients and staff. Healthcare staffing is also reduced from 3:30pm.  Nursing
staff told inspectors that this made them feel vulnerable and unsupported.  The lack
of medical cover in the afternoons was escalated at the time of the inspection to the
Clinical Service Manager for HMP Shotts and advised that we would be formally
escalating these concerns to the North Lanarkshire Health & Social Care
Partnership, NHS Chief Executive and SPS Chief Executive.

Page 118

105 
Recommendation 48: North Lanarkshire HSCP must revise without delay, the
process in place when identifying long term health conditions and provide
assurance that patients are reviewed in line with what is equitable in the
community to address health inequalities. 
Recommendation 49: North Lanarkshire HSCP must implement a system for
secondary care referrals that ensures patient confidentiality is protected 
Recommendation 50: North Lanarkshire HSCP must ensure that all eligible
patients who wish to be involved in national screening programmes are
supported to do so and that this is clearly documented in the patients VISON
record. 
Recommendation 51: North Lanarkshire HSCP must ensure that checks on
emergency equipment are carried out within the agreed timeframe and that
these checks are clearly recorded. 
Recommendation 52: North Lanarkshire HSCP as a matter of urgency must
review the medical cover available in the afternoons to: 
(iii) ensure the risk to patients is reduced.
(iv) support nursing staff in dealing with emergency situations. 
Good Practice 13: Where secondary care appointments were missed, the GP
triaged these appointments so that the most clinically urgent were prioritised to
be rescheduled. 
Good Practice 14: Healthcare and SPS staff worked collaboratively to provide
transport for these clinically urgent appointments with GEOAmey to support
this. 
9.3 Health improvement, health prevention and health promotion
information and activities are available for everyone. 
Rating:  Generally acceptable performance 
An opt-out Blood borne virus (BBV) screening programme was in place as part of
the health screening process at the prison. Where patients had not received this
screening at reception, they were able to opt-in to be screened through the
healthcare self-referral form. Health promotion activity was in place in relation to
infectious disease prevention.  This included health education and health
promotion programmes.  However, it was not clear during the inspection what
process was in place to ensure delivery of all national and local age appropriate
health screening.  Inspectors were told that screening appointment invitations
were sent direct to patients but this could not be evidenced in a patient’s Vision
care record. This was a concern. In the absence of a clear recording process,
inspectors cannot be assured that patients are getting access to national
screening and surveillance programmes.

Page 119

106 
A wide variety of health education and health promotion information was available
and displayed in patient areas, including the halls, health centre waiting room and
visitors centre.  Development work was in progress to ensure the leaflets and
posters were available in a variety of formats making them accessible to a wide
range of people. The information displayed included how to make informed
decisions about health; including sexual health information and risks associated
with drug use. 
Healthcare and prison staff worked together to deliver a programme of health
promotion activities based on; health improvement, making better decisions and
understanding the risks of behaviours and choices.  The prisoner information
channel was used to share health promotion notices including a podcast with
information on oral health, mental health support and a mindfulness group which
was run by psychology.  This is good practice. The health improvement staff
worked with the education department to deliver an 8-week heart health course
and a mental health stigma workshop.  This is good practice. 
Peer support was available through cocaine and alcoholics anonymous meetings.
Details on how to attend these mutual aid meetings were displayed in the halls
and patients would be signposted if they were engaged with the Addictions Team. 
All prisons in Scotland are non-smoking establishments. Vapes were made
available to all prisoners in HMP Shotts. Information and support was also
available on nicotine withdrawals and how to reduce or stop vaping. 
Those wanting to access sexual health services in the prison could do so by
completing the healthcare self-referral form. 
Recommendation 53: North Lanarkshire HSCP must ensure that patients
are able to access national screening programmes in line with community
provision and keep accurate records of attendance. 
Good Practice 15: Prisoner information channel used to share health
promotion notices including a podcast with information on oral health, mental
health support and a mindfulness group which was run by psychology. 
Good Practice 16: Links with education department delivering heart health
course and mental health stigma workshop. 
9.4 All stakeholders demonstrate commitment to addressing the health
inequalities of prisoners. 
Rating:  Satisfactory performance 
Healthcare staff described an understanding of health inequalities and were
knowledgeable about the potential barriers to accessing care.  Staff demonstrated a
respectful and professional approach to all patients whilst maintaining confidentiality.
They were supportive and gave explanations of care to be given whilst gaining
consent.  For example, at medication rounds staff took opportunities to support
patients raising other healthcare concerns.

Page 120

107 
We saw evidence that staff are directed to NHS Lanarkshire’s electronic learning
platform where modules on equality and diversity are available.  Staff spoken with
were aware of the Equality Act 2010 and could sign post to where up to date policies
were available on the staff intranet.  Barriers to accessing care were identified at
admission and staff facilitated any requirement to utilise interpreter services. 
9.5 Everyone with a mental health condition has access to treatment
equitable to that available in the community, and is supported with their
wellbeing throughout their stay in prison, on transfer and on release. 
Rating:  Satisfactory performance 
A validated assessment tool was used to assess people referred to the Mental
Health Team. This included an assessment of the patient's mental health, history,
psychosocial factors, identification of risks, formulation of presenting problem and
recommendation for care intervention.  A risk assessment was completed for all
patients at time of assessment and this was routinely updated every six months or in
line with any significant changes in risk. Whilst the service used standardised tools
for assessments and care plans, there was no electronic system in place.  Having an
electronic system would enable staff to record and update documents to keep them
live and ensure the most up-to-date information was accessible. 
Patients were fully involved in their assessment, and had the opportunity to
discuss the purpose and outcome of this assessment.  The risks and benefits of
any treatment or intervention offered were discussed with patients to allow them to
make informed choices about their care.  Individual person-centred outcome
focussed care plans were written with the patient which reflected their goals.
Patients had regular reviews where they were able to discuss and review their
care. 
The multidisciplinary Mental Health Team consisted of health and social care
professionals, including mental health nurses, psychologists and a consultant
psychiatrist.  There are challenges that NHS Lanarkshire are aware of and
identified in the service review regarding the gaps in workforce. Due to the staffing
pressures in the workforce, mainly in primary care, it meant that mental health
nursing staff supported the wider healthcare team when required. 
Whilst psychology provided neuropsychological assessments there was no
process in place to access specialists in intellectual disabilities, autistic spectrum
disorder, neuropsychiatric disorders and cognitive impairment. 
The clinical lead for the team was a consultant psychiatrist, who chaired the
weekly meetings where updates from each discipline were provided.  Discussions
took place about a number of areas including; patients currently on Talk to Me,
hospital referrals, upcoming liberations (including follow up arrangements), Care
Programme Approach (CPA) plans for patients returning from hospital and waiting
times for each discipline. 
A wide range of therapies and treatments, appropriate for the patient population,
were provided within the prison. The Mental Health Team’s operational guidelines

Page 121

108 
details the procedure in place for working in partnership with services including;
GP and physical health team, addiction service, social work, advocacy,
chaplaincy, listener/peer support service and forensic psychology.  The treatments
and interventions offered to patients within the prison are equitable to those
available in the community.  The waiting times at the time of the inspection were
acceptable and no longer than the national waiting times for these services. 
An emotional resource group, facilitated by psychology, had been piloted within
the prison with positive feedback received.  The group focussed on supporting
prisoners to improve their awareness, recognition and regulation of difficult
emotions. This is good practice.  At the request of SPS, psychology have
recently started facilitating drop in support sessions following adverse events
within the prison. The sessions focussed on psychoeducation and signposting to
services to provide support to those who may have witnessed a traumatic incident,
or be emotionally impacted by an adverse event. This is good practice. 
Systems and processes were in place to ensure that any patient requiring
inpatient mental health care is assessed and transferred to hospital under the
Mental Health Care and Treatment (Scotland) Act 2003. 
Robust systems and processes were in place to ensure that patients requiring
community follow-up on release from prison were referred to relevant services.
This also included the provision of detailed discharge summaries. 
Recommendation 54: North Lanarkshire HSCP must introduce an electronic
system to record and update documents to keep documents live and ensure
the most up to date information is accessible. 
Recommendation 55: North Lanarkshire HSCP must develop a pathway for
accessing specialist support in intellectual disabilities, autistic spectrum
disorder, neuropsychiatric disorders and cognitive impairment. 
Good practice 17:  An emotional resource group facilitated by psychology was
piloted within the prison with positive feedback received. The group focussed
on supporting prisoners to improve their awareness, recognition and regulation
of difficult emotions. 
Good Practice 18: At the request of SPS, psychology recently started
facilitating drop in support sessions following adverse events within the prison.
The sessions focus on psychoeducation and signposting to services to provide
support to those who may have witnessed a traumatic incident or be
emotionally impacted by an adverse event.

Page 122

109 
9.6 Everyone with a long-term health condition has access to treatment
equitable to that available in the community, and is supported with their
wellbeing throughout their stay in prison, on transfer and on release. 
Rating:  Poor performance 
Inspectors were told that patients with a long-term condition were identified at their
health screening during admission, through nurse triage or at medicine reconciliation.
However, there was no formal process to ensure that patients were appointed for
ongoing regular reviews. No long-term condition clinics or annual reviews were taking
place in HMP Shotts at the time of inspection. 
Care plans were observed to be in place for some patients with associated risk
assessments. However, the care plans were not person centred or outcome
focussed and there was an inconsistent approach in regard to the implementation
and review of the plans and risk assessments.  Do not attempt cardiopulmonary
resuscitation (DNACPR) forms were seen to be in place for two patients and these
were generally well completed including the discussion with the patient. 
Inspectors were told of continued challenges with nursing staff resources and
capacity this was observed during the inspection, as described in the escalation.
The lack of medical cover was impacting on the ability to provide long term condition
management of patients.  All patient healthcare records are held in the Vision
computer system. It was not clear how staff were using the full function of this
system effectively to collect data for patients with long-term health conditions. These
factors have led to a systematic failure to deliver long-term condition reviews and
oversight. 
Nursing staff described links with community services for support and advice. For
example, the tissue viability service and Diabetes service. This was working well to
support patients. 
Recommendation 56: North Lanarkshire HSCP must ensure that person
centred care plans and appropriate risk assessments are in place for all
patients with long-term conditions and that these are reviewed regularly. 
9.7 Everyone who is dependent on drugs and/or alcohol receives treatment
equitable to that available in the community, and is supported with their
wellbeing throughout their stay in prison, on transfer and on release. 
Rating:  Satisfactory performance 
Patients requiring support with drug and/or alcohol dependence were identified at
health screening on transfer to the prison or as part of their health assessment
appointments, using a validated screening tool. The outcome was documented in
the patient care record.  Patients were also sent a letter signposting them to support
services available within the Addictions Team. As highlighted in QI 9.5 it is a
concern that patient assessments are recorded on paper and scanned.  The service
should review IT options for patient assessments to be stored electronically allowing
live documents (see recommendation in Q.I. 9.5).

Page 123

110 
Systems and processes were in place to confirm prescriptions of those patients
transferred to the prison.  A copy of the Kardex was brought to HMP Shotts from the
transferring prison for patient’s prescribed OST. 
Individual support needs for patients referred to addiction services were identified
through an assessment process. Individual person-centred outcome-focussed
care plans which reflected the support needs required, were in place for all
patients.  There was evidence of patient involvement in the writing of their care
plans which were regularly reviewed, monitored and updated by the patient and
their nurse or caseworker.  Funding was due to be allocated for increasing the
number of patients able to access Buvidal (long acting buprenorphine injections).
Therefore, there were some limitations in terms of promoting patient choice for
OST in line with the MAT standards at the time of the inspection. Senior
managers were aware and liaising with the board to follow up the allocation of
funding. 
Patients were provided with evidence-based pharmacological, harm reduction and
psychological interventions.  These interventions include psychosocial clinical
interventions, relapse management and Cognitive Behaviour Therapy based
psychoeducational work.  A mindfulness group was available to prisoners, facilitated
by an addictions caseworker delivering breath work, mindfulness and meditation. 
Systems and processes were in place to ensure that copies of patients’
medication prescription accompanied patients who were transferred to other
prisons. This system was designed to ensure that there was no delay in
continuing treatment once they arrived at the receiving prison. 
A standardised discharge planning tool was in place and ensured that patients
were referred to community services and information was passed to these
services for continuity of care. This included the early identification of community
prescribers and pharmacies.  All prisoners preparing for liberation were offered a
harm reduction session that covered CPR training, overdose prevention and use
of injectable naloxone use. 
The Addictions Team consisted of a range of multidisciplinary professionals
including addictions nurses, case workers and a lead medical practitioner for
addictions. The team worked closely with the Mental Health Team to allow for a
range of treatments and therapies to be offered to patients.  A multidisciplinary
team meeting took place each week to discuss the allocation of referrals, and the
assessments and reviews of patients.  A medical practitioner for addictions is the
clinical lead for the team. Written systems, protocols and procedures were in
place to describe the joint working with mental health and primary care services
for patients with co-morbidities.  These included regular meetings with mental
health nurses and/or primary care nurses according to the needs of the patients
with co-morbidities.  A multidisciplinary Substance Misuse Group has recently
been restarted; the Addictions Team and SPS staff meet monthly to discuss any
prisoners who may benefit from input from the Addictions Team.  This is good
practice.

Page 124

111 
Good Practice 19: A multidisciplinary substance misuse group has recently
been restarted; the Addictions Team and SPS staff meet monthly to discuss
any prisoners who may benefit from input from the Addictions Team. 
9.8 There is a comprehensive medical and pharmacy service delivered by
the service. 
Rating:  Poor performance 
The Clinical Pharmacy Service delivered within HMP was provided by the national
contract supplied by Lloyds Pharmacy.  The current clinical pharmacy role involves
the regular review of patient Kardexes and providing advice to other members of the
multidisciplinary team. It also involves regular controlled drug checks (as part of the
contract) but does not form part of a Clinical Pharmacy Service.  The role was not
patient facing and was not shown to be accessible for the population of HMP Shotts
to discuss their medications with a member of the Pharmacy Team.  This was not
equitable to what is provided within the community in NHS Lanarkshire and is a
concern. North Lanarkshire’s HSCP shared their service review as part of their
evidence which contained specific recommendations about a Pharmacy Service.
The service must action the recommendations regarding pharmacy provision and
support as a matter of priority. 
NHS Lanarkshire provides HMP Shotts with pharmacy support for six hours per 
week to manage the Lloyds contract. During the discussions in relation to pharmacy,
it was evident that pharmacy had not been part of the self-evaluation process. They
described a lack of ability to influence within the service.  Since the pandemic, they
had been unable to attend the establishment due to a lack of available space. There
was a lack of evidence to support multidisciplinary working in relation to medicines
and the Pharmacy Service. 
The pharmacist described Standard Operating Procedures in place, which pharmacy
had been involved in approving as part of the Home Office License Application.
There was an up-to-date Home Office Licence in place at the time of our inspection. 
The pharmacist described the Prescribing Advisory Group (PAG) which prior to
COVID-19 was well established, with a standing agenda and monitored prescribing
as part of a multidisciplinary discussion.  This was described to be in line with the
current work within primary care which was positive. 
There are strong links with the National Prison Pharmacist Group and the pharmacist
representing NHS Lanarkshire advised that there is regular communication with the
service.  This included updates on outcomes of these meetings via email, telephone
calls and updates through the PAG (when this was operational).  As the PAG has not
been in existence since prior to the COVID-19 pandemic, it was unclear how the
prescribing of medicines and the reviews of these have been managed during the
pandemic. 
Inspectors spoke to staff providing Pharmacy Support Services and management
was being provided by the Primary Healthcare Team.  It was not clear of the wider

Page 125

112 
links to the NHS Lanarkshire Pharmacy Service for professional support and
development. 
The variable levels of GP cover within the establishment was raised as a concern
and were escalated during the inspection.  Discussions with pharmacy staff also
identified challenges with building effective working relationships with GPs to
improve prescribing practices and the potential to develop multi-disciplinary team
working to improve patient outcomes.  For example, the inspectors identified some
inconsistencies and follow up when patients were on high dose antipsychotic
medication.  Inspectors were provided with the service review and acknowledged the
recommendations in relation to medicine cover. 
During our inspection, inspectors reviewed the timings of medication administration.
Some patients had supervised administration as not all patients are suitable for in
possession medication.  Inspectors saw that with the limitations in place due to the
SPS regime, some patients were receiving their sedative medication early, between
3pm to 5pm. This was not therapeutic and was a significant concern. SPS must
seek solutions to assist staff to administer medication at a suitable and therapeutic
time. 
Nursing staff were observed administering medication and inspectors saw this was
carried out safely.  Paperwork in relation to medication administration was generally
well completed. 
Concerns regarding nursing staff wearing radio earpieces during medication
administration and the risk of medication errors was discussed with SPS staff during
the inspection. This practice was changed during the inspection and staff were
being accommodated to turn their radio’s off during medicine administration times. 
Recommendation 57: As a priority North Lanarkshire’s HSCP must action the
recommendations made in their service review regarding pharmacy provision
and support to provide a service equitable with the community. 
Recommendation 58: NHS Lanarkshire’s pharmacy service must provide
structured and regular support to staff involved in supporting pharmacy services
within HMP Shotts. 
Recommendation 59: North Lanarkshire HSCP and SPS must seek solutions
to assist staff to administer medication at a suitable and therapeutic time 
9.9 Support and advice is provided to maintain and maximise individuals’
oral health. 
Rating:  Generally acceptable performance 
Dental care was delivered in a clean and well-maintained environment.  Dental
procedures and management were carried out in line with national and
NHS Lanarkshire guidelines.

Page 126

113 
Patients were able to self-refer to the dental service and were given a letter to inform
them of the date and time of their appointment or that they were on the waiting list.
The dentist was available four days per week and managed their own waiting list,
with a dental hygienist being available one day per week. 
Daily dental lists were managed to allow emergency treatments such as patients with
pain to be seen as quickly as possible, usually the next day.  The waiting time for
other dental emergencies such as broken tooth was approximately two weeks.  The
waiting time for routine examinations was much longer.  Inspectors were told that
patients who required emergency dental care, or who were on treatment plans took
priority over those requesting a routine examination. Inspectors saw the current
waiting list that had 120 patients, the longest wait was from October 2020.
Inspectors were told that the waiting list may not be completely accurate as some
patients on it may have been seen more quickly, as an emergency or may have
been released from prison. Inspectors were told that oversight and management of
the dental waiting list was the responsibility of the Dental Team. 
The dental staff told inspectors that prior to the COVID-19 pandemic there were oral
health educators who worked in the prison, who they considered a good resource.
The oral health educators provided support directly to prisoners and could also be
another source for the referral of patients to the dental service.  Staff told inspectors
that the reintroduction of oral health educators may reduce the number of patients on
the waiting list. 
Clean and used dental instruments were stored appropriately, used and
contaminated instruments were taken off site for decontamination. 
Recommendation 60: NHS Lanarkshire HSCP should consider the
reintroduction of the oral health educator role to support the dental service. 
9.10 All pregnant women, and those caring for babies and young children,
receive care and support equitable to that available in the community, and are
supported with their wellbeing throughout their stay in prison, on transfer and
on release. 
Rating:  Not applicable 
There were no female prisoners in HMP Shotts at the time of the inspection. 
9.11 Everyone with palliative care or end of life care needs can access
treatment and support equitable to that in the community, and is supported
throughout their stay in prison, on transfer and on release. 
Rating:  Generally acceptable 
A standardised national assessment tool, (SPICT) was in place in HMP Shotts to
assess both palliative and end of life care needs. Palliative care when required was
delivered in conjunction with both NHS and SPS.  Development of ACPs had been
compromised by the pandemic and competing staffing priorities.  However,
continued work with St Andrews Hospice was identified as a priority for healthcare

Page 127

114 
staff in HMP Shotts to continue to develop the work around ACPs and attendance at
the Macmillan Palliative Care Team in custody group. 
Staff described how to access all necessary services, facilities and equipment
services to deliver safe, effective, person-centred palliative or end of life care. 
There was evidence of a positive team-working relationship between the Prison
Healthcare Team, NHS board palliative care service and community service.  There
was also strong links identified with Macmillan Palliative Care Team. Community
Occupational Therapy services were accessed through the Community Rehab Team
at University Hospital Wishaw if there was a requirement to assess patients for aids
and adaptation. Staff described a prompt response. 
The accessible cells in HMP Shotts were of a good standard, they were spacious
and well maintained. 
Prior to the pandemic any patients receiving palliative or end of life care were
discussed by both SPS and NHS at a multidisciplinary meeting monthly. Staff were
keen to reinstate this as a priority. 
9.12 Everyone at risk of self-harm or suicide receives safe, effective and
person centred treatment, and support with their wellbeing throughout their
stay in prison, on transfer and on release. 
Rating: Satisfactory performance 
On transfer to the prison, every patient at risk of self-harm or suicide was
assessed using a standardised and validated health screening tool, if the transfer
took place before 6pm. As referenced in QI 9.1 there was no healthcare staff on
duty from 6pm to complete risk assessments and follow the talk to me process. 
Any patient identified as being at risk of self-harm or suicide during their admission
to prison or during their stay in prison were immediately commenced onto TTM.
Inspectors reviewed several completed care plans and found them to be
comprehensive and demonstrated patient involvement.  This included the types of
treatment being offered and were regularly reviewed. 
TTM case conferences were attended by the SPS and where possible a mental
health nurse who was involved in the patients ongoing care.  Mental health
nursing cover was available Monday to Friday 8:30am to 3:30pm.  Any case
conferences taking place outside these times were attended by a primary care
nurse. The Healthcare Team was aware of the importance of a registered mental
health nurse (RMN) attending who knows the patient therefore tried to plan TTM
around this. Patients were also encouraged and supported to participate in their
own case conference. If a translator was required to support the patient this was
booked in advance. All members of the wider Primary Care Nursing Team,
involved in caring for patients had undergone TTM training. 
Evidence of a good multi-disciplinary Mental Health Team (MHT) was in place as
discussed in QI 9.5. The clinical MDT discussed all patients who were in the SRU

Page 128

115 
and being managed under Rule 41 (which relates to accommodation in specific
conditions). There was a suicide prevention meeting with representatives from
SPS and mental health nurses. 
Staff were able to arrange an urgent same day appointment with a mental health nurse
for any patient who appeared to be at immediate risk of self-harm or suicide. 
Each stage of TTM process was clearly documented in the patient record on Vision. 
9.13 All feedback, comments and complaints are managed in line with the
respective local NHS Board policy. All complaints are recorded and responded
to in a timely manner. 
Rating:  Poor performance 
All complaints, comments and feedback were managed in line with the local NHS
complaints policy. 
There was a clear governance structure in place for reporting and responding to
complaints and feedback.  Information posters describing the process were
displayed in patient areas, including the halls and health centre waiting room.
Feedback and comments forms and complaints forms were available in the halls,
the patient waiting area in the health centre and on request from healthcare staff.
These forms were clear and easy to understand in English however, the forms
were not available in alternative formats and languages. 
Systems and processes were in place to record all complaints received in the health
centre along with the date of receipt to ensure they were processed and responded
to within set timescales. 
Systems and processes were in place to ensure that those making complaints would
be acted on without negative consequences to current and future care or support. 
Registered nurses had the responsibility of reviewing complaints.  There was no
evidence if staff had received training on how to review, respond and escalate
complaints. 
Whilst staff had the opportunity to have informal discussions about complaints there
was no formal process in place to share learning from complaints.  Inspectors were
told that staff meetings were currently not taking place due to staffing shortages.  It
would be useful to hold weekly team meetings where learning from complaints can
be disseminated with the wider Healthcare Team. 
Information was provided at the end of each complaint response informing patients of
their right to contact the Scottish Public Services Ombudsman if they were not satisfied
with the outcome or response to their complaint. Information about how to do this was
also included.

Page 129

116 
Recommendation 61: NHS Lanarkshire HSCP and SPS must ensure
complaints forms are available in alternative formats and languages to ensure
all patients can provide feedback, raise concerns and complain. 
Recommendation 62: NHS Lanarkshire HSCP must ensure that all staff
managing complaints receive training to ensure that all complaints are correctly
managed. 
Recommendation 63: NHS Lanarkshire HSCP should develop a process to
discuss complaints to share learning and identify any themes or required
improvements. 
9.14 All NHS staff demonstrate an understanding of the ethical, safety and
procedural responsibilities involved in delivering healthcare in a prison
setting. 
Rating:  Poor performance 
Staff had a clear understanding of their roles and responsibilities in reporting any
situations which could result in physical or psychological harm to those in prison.
Healthcare staff indicated that any issues requiring to be raised as a priority were
recorded on a SPS intelligence report. All registered staff were aware of their legal
obligations for confidentiality and keeping accurate and prompt records, as part of
maintaining their registration and commitment to the Nursing and Midwifery
Council (NMC) code. All staff had their own access to the electronic record keeping
system Vision clinical system.  As part of prison healthcare staff induction, staff were
informed how to report any concerns. 
Inspectors were told that secondary care appointments were being sent by post
because of issues with the IT systems in HMP Shotts, this is a significant data risk. 
Inspectors were made aware during the inspection that practice had changed and all
referrals to secondary care were being managed electronically directly to the NHS
board and postal referrals would be stopped.  Inspectors will follow this up as part of
their revisit. 
Recommendation 64: NHS Lanarkshire HSCP must ensure that alternative and
consistent IT solutions are provided to support clinical staff as referrals by post is a
significant data breach. 
9.15 The prison implements national standards and guidance, and local
NHS Board policies for infection prevention and control. 
Rating: Satisfactory performance 
Inspectors observed good infection control precautions in place at HMP Shotts.  PPE
was available with hand sanitiser and both clinical and domestic waste bins were
available for disposal. Visitors were sign posted to use masks on arrival and to
dispose of when leaving.  At reception, visitors were prompted sanitising the boxes
used for personal belongings, this is good practice.

Page 130

117 
The healthcare centre facility and clinical rooms within HMP Shotts were of a good
standard and were visibly fresh and clean, the fabric was intact and could be
effectively decontaminated.  Inspectors saw areas in the halls where healthcare staff
administer medicines and triage, these were of a good standard and were clean and
ready for use. 
Inspectors saw evidence of daily cleaning schedules with senior nurse oversight and
sign off.  HMP Shotts used an electronic system to upload audits including standard
infection control audits. These were reviewed for compliance by senior staff and
results were shared through staff safety briefs for any non-compliance actions plans
to be completed. These were also shared at the North Hygiene meetings
represented by senior management.  Healthcare staff had standard infection audit
programme in place which included other aspects of healthcare delivery and
compliance.  Cleaning resource was provided by a private contractor supplied by
SPS. The cleaning was of a good standard and staff reported no concerns with
provision.  Trained pass men were responsible for cleaning in residential areas and
were visible throughout the inspection.  The standard of cleanliness in HMP Shotts
was high. 
The health centre is also externally audited by NHS Lanarkshire. Inspectors
observed the most recent audit carried out.  This had identified some areas for
improvement that staff had acted upon. 
Equipment was clean and ready for use and staff were knowledgeable about
standard infection control precautions (SICPs).  Inspectors observed good hand
hygiene practice from staff. Healthcare staff could sign post inspectors to the
National Infection Prevention and Control Manual (NIPCM) through NHS Lanarkshire
intranet platform.  Inspectors saw infection prevention control was part of staff
mandatory training requirements. 
Staff had been fitted for FFP3 masks during the pandemic, these were available in
emergency bags. PPE was readily available in clinical areas and staff were wearing
masks. Inspectors saw some variable compliance with mask wearing from
SPS officers, this was raised at the time of the inspection. Changes to guidance was
discussed at the morning adult services huddle.  A newsletter was produced from
these meetings which would include any changes to guidance to be shared with
staff. This is good practice. 
Good Practice 20: Anti-bacterial hand sanitisers were available and a system
in place to decontaminate the boxes used for personal belongings at security
for visitors to HMP Shotts. 
Good Practice 21: A newsletter is produced from the daily huddles which
would include any changes to guidance to be shared with staff.

Page 131

118 
9.16 The prison healthcare leadership team is proactive in workforce
planning and management. Staff feel supported to deliver safe, effective, and
person-centred care. 
Rating:  Poor performance 
HMP Shotts Healthcare team had experienced significant and sustained staff
shortages across all disciplines.  Continued staff shortages had impacted on the
team ability to provide adequate staffing and maintain a safe skill mix on some
occasions.  During the inspection there were further absences in the Senior
Leadership team for both primary care and mental health services.  Nursing staff
numbers were further reduced to 2 primary care nurses at 3.30pm when other
members of the multidisciplinary team shift ended. From 3.30pm to 6pm their role
was to provide healthcare delivery which included responding to emergencies,
admitting prisoners being transferred from other prisons and delivering medications.
As described in the escalation and in QI 9.2 there was no GP cover after 1.30pm. 
As a direct result of absences within the Senior Leadership team, staff reported they
were not receiving one to one support or clinical supervision in any consistent
pattern. Staff morale was low and staff were reporting fatigue.  The fragility in the
workforce was a significant concern and was escalated during the inspection.  There
was no consistent senior leadership structure in place to support staff in the absence
of medical cover.  Inspectors found all staff to be open and honest about the
challenges in HMP Shotts. Senior managers were aware of the ongoing challenges
for staff in HMP Shotts. Inspectors were provided with evidence of the service model
review commissioned by senior management from North Lanarkshire HSCP. In
response to the identified challenges during a change in leadership accountability for
HMP Shotts prior to the inspection including a workforce review.  This had identified
key areas of improvement and actions which illustrated the significant concerns
raised by inspectors however inspectors raised concerns regarding the staffing
provision both nursing and GP’s, the impact on staff and the impact on patients
because of the lack of provision. 
There was a commitment to review workforce and seek solutions to provide
additional staff and senior oversight in HMP Shotts with a continued recruitment.
This would allow a re-introduction of clinical supervision and one to one support for
staff. Inspectors will follow up the progress of this work with HMP Shotts following
the escalation response and will return to HMP Shotts to review progress. 
There was a mandatory training programme in place which was overseen by senior
management. All staff in HMP Shotts had received an induction programme.
Inspectors participated in the daily huddle which was used as a mechanism to RAG
rate staffing insufficiencies and seek solutions amongst other patient centred
discussion. This is good practice. 
Recommendation 65: North Lanarkshire HSCP must demonstrate
implementation of recommendations from service review and provide clear
pathways to support staff on site in HMP Shotts in the absence of senior staff.

Page 132

119 
Good Practice 22: The daily huddle was used as a mechanism to RAG rate
staffing insufficiencies and seek solutions amongst other patient centred
discussions. 
9.17 There is a commitment from the NHS Board to the delivery of safe,
effective and person-centred care which ensures a culture of continuous
improvement. 
Rating:  Generally acceptable performance 
HMP Shotts Prisoner Healthcare Team was managed by the Adult Health Services
Unit (AHSU) within North Lanarkshire Health & Social Care Partnership (HSCP).  A
restructure of the North Lanarkshire HCSP took place over a year ago resulting in
changes in both leadership and responsibility of Prisoner Healthcare Team.  In
response to identification of underlying challenges in healthcare delivery a service
model review of HMP Shotts was carried out in March 2022 and an action plan was
developed, this is good practice.  Inspectors reviewed both the service review and
action plan provided and were encouraged to see identification of many planned
improvements. These had been assigned senior leadership and yet to have
identified timelines. Inspectors will follow up and review the progress of this work. 
Operational healthcare staff within the prison were aware of the HSCP Leadership
structure and their roles and responsibilities for the ongoing service delivery of
healthcare within the prison. There had been changes in leadership in this structure
in the last year.  Nursing staff could describe the leadership structure but were not
familiar with some of the senior management that were present during the
inspection. 
Senior managers from the North Lanarkshire HSCP were visible in the health centre
during the inspection but did not routinely base themselves in HMP Shotts. 
Inspectors were provided with evidence that prisoner healthcare is represented at all
appropriate NHS Lanarkshire primary care forums. There was leadership and
representation of prisoner healthcare services across the Operational, Governance
and Professional Senior Manager Team forums. 
Where patients had concerns about healthcare delivery, they were encouraged to
report these using the complaints forms available in the residential areas. The
service review had also highlighted plans to improve service delivery by conducting
surveys and questionnaires for patients led by health improvement colleagues. 
Prison healthcare uses the DATIX system to report any adverse events in
NHS Lanarkshire. Reports from this were visible to managers within the HSCP and
were discussed at clinical governance committee meetings.  Inspectors were
provided with minutes of this meeting and saw DATIX relating to prisoner healthcare
being discussed. Staff told inspectors there was inconsistency in reporting due to
staff shortages. Any learning from DATIX incidents was shared with staff verbally as
well as by email.

Page 133

120 
Good Practice 23: In response to identification of underlying challenges in
healthcare delivery a Service Model Review of HMP Shotts was carried out in
March 2022 and an action plan was developed.  HIS inspectors will look for
evidence of implementation of this action plan in future inspections.

Page 134

121 
Annex A 
Summary of Recommendations 
To be updated after matters of fact stage

Page 135

122 
Annex B 
Summary of Good Practice 
To be updated after matters of fact stage

Page 136

123 
Annex C 
SUMMARY OF RATINGS 
Standard/QI Standard rating/QI rating 
Standard 1 – Lawful and Transparent Custody Satisfactory
QI 1.1 Satisfactory
QI 1.2 Satisfactory
QI 1.3 Satisfactory
QI 1.4 Satisfactory
QI 1.5 Satisfactory
QI 1.6 N/A
QI 1.7 Satisfactory
QI 1.8 Generally acceptable
QI 1.9 Satisfactory 
Standard 2 – Decency Generally acceptable
QI 2.1 Satisfactory
QI 2.2 Satisfactory
QI 2.3 Generally acceptable
QI 2.4 Satisfactory
QI 2.5 Satisfactory
QI 2.6 Poor 
Standard 3 – Personal Safety Generally acceptable
QI 3.1 Generally acceptable
QI 3.2 Good
QI 3.3 Generally acceptable
QI 3.4 Generally acceptable
QI 3.5 Satisfactory
QI 3.6 Generally acceptable
QI 3.7 Satisfactory 
Standard 4 – Effective, Courteous
and Humane Exercise of Authority Satisfactory
QI 4.1 Generally acceptable
QI 4.2 Generally acceptable
QI 4.3 Satisfactory
QI 4.4 Satisfactory
QI 4.5 Generally acceptable
QI 4.6 Satisfactory
QI 4.7 Satisfactory
QI 4.8 Satisfactory
QI 4.9 Satisfactory
QI 4.10 Good

Page 137

124 
Standard 5 – Respect, Autonomy and Satisfactory
Protection Against Mistreatment
QI 5.1 Satisfactory
QI 5.2 Satisfactory
QI 5.3 Good
QI 5.4 Satisfactory
QI 5.5 Satisfactory
QI 5.6 Satisfactory
QI 5.7 Satisfactory
QI 5.8 Satisfactory 
Standard 6 – Purposeful Activity Generally acceptable
QI 6.1 Generally acceptable
QI 6.2 Generally acceptable
QI 6.3 Generally acceptable
QI 6.4 Generally acceptable
QI 6.5 Good
QI 6.6 Generally acceptable
QI 6.7 Satisfactory
QI 6.8 Satisfactory
QI 6.9 Generally acceptable
QI 6.10 Satisfactory
QI 6.11 Good
QI 6.12 Good
QI 6.13 Satisfactory
QI 6.14 Generally acceptable
QI 6.15 Good 
Standard 7 – Transitions from Custody into the Community Generally acceptable
QI 7.1 Generally acceptable
QI 7.2 Satisfactory
QI 7.3 Satisfactory
QI 7.4 Generally acceptable
QI 7.5 Generally acceptable 
Standard 8 – Organisational Effectiveness Generally acceptable
QI 8.1 Poor
QI 8.2 Satisfactory
QI 8.3 Satisfactory
QI 8.4 Generally acceptable
QI 8.5 Generally acceptable
QI 8.6 Generally acceptable
QI 8.7 Satisfactory
QI 8.8 Satisfactory 
Standard 9 – Health and Wellbeing Poor
QI 9.1 Generally acceptable
QI 9.2 Generally acceptable
QI 9.3 Generally acceptable

Page 138

125 
QI 9.4 Satisfactory
QI 9.5 Satisfactory
QI 9.6 Poor
QI 9.7 Satisfactory
QI 9.8 Poor
QI 9.9 Generally acceptable
QI 9.10 N/A
QI 9.11 Generally acceptable
QI 9.12 Satisfactory
QI 9.13 Poor
QI 9.14 Poor
QI 9.15 Satisfactory
QI 9.16 Poor
QI 9.17 Generally acceptable

Page 139

126 
Annex D 
Prison Population Profile on [ADD DATE]

Page 140

127 
Annex E 
Inspection Team 
Wendy Sinclair-Gieben, HMIPS
Stephen Sandham, HMIPS
Calum McCarthy, HMIPS
Kerry Love, HMIPS
Sam Gluckstein, HMIPS
Billy Menzies, Serco
Paul Durning, SPS
John Shanks, Scottish Prison Service
Margaret Rose Livingstone, Education Scotland
Ann Kivlin, Education Scotland
Sheila Brown, Education Scotland
Neil Gentleman, Care Inspectorate
James Black, Care Inspectorate
Catherine Haley, HIS
Lindsay Macphee, HIS
Jamie Thomson, HIS
Sophie Moss, HIS

Page 141

128 
Annex F 
Acronyms used in this Report 
ABS Anti-Bullying Strategy
ACP Anticipatory Care Plan
AHSU Adult Health Services Unit
BBV Blood Borne Virus
BICS British Institute of Cleaning Science
BSL British sign language
CAST Custody Adjustment Support and Transition
CBSW Community Based Social Workers
CIP Community Integration Plan
CMHT Community Mental Health Team
C&R Control and Restraint
CCTV Closed Circuit Television
COPFS Crown Office and Procurator Fiscal Service
COVID-19 Corona Virus Disease 2019
CPA Care Programme Approach
CPR Cardiopulmonary resuscitation
CPT European Committee for the Prevention of Torture and Inhuman
or Degrading Treatment or Punishment
DATIX NHS electronic incident reporting system
DNACPR Do not attempt cardiopulmonary resuscitation
ECR Electronic Control Room
ECHR European Convention of Human Rights
E&D Equality and Diversity
EDF Equality and Diversity Form
ESOL English to Speakers of Other Languages
FCO Family Contact Officer
FLM First Line Manager
GBTS Getting Better Together Shotts
GIC Governor in Charge
GPAs General Programme Assessments
H&S Health and Safety

Page 142

129 
HIS Healthcare Improvement Scotland
HMCIPS Her Majesty’s Chief Inspector of Prisons for Scotland
HMIPS Her Majesty’s Inspectorate of Prisons for Scotland
HMP Her Majesty’s Prison
HQ Headquarters
HSCP Health and Social Care Partnership
ICC Internal Complaints Committee
ICM Integrated Case Management
IMU Intelligence Management Unit
IPM Independent Prison Monitor
LCM Learning Centre Manager
LIM Local Incident Management
LS/CMI Level of Service/Case Management Inventory
LTPs Long Term Prisoners
MAPPA Multi-Agency Public Protection Arrangements
MDT Multi-Disciplinary Team
MHT Mental Health Team
MORS Management of an Offender at Risk from Any Substance
NIC National Induction Centre
NIP National Induction Presentation
NIPCM National Infection Prevention and Control Manual
NMC Nursing Midwifery Council
NOC Notification of Concern
NPM National Preventive Mechanism
NTE National Top End
OPCAT UN Convention against Torture and other Cruel, Inhuman or
Degrading Treatment or Punishment
OLR Order of Lifelong Restriction
OST Opiate Substitution Therapy
PAG Prescribing Advisory Group
PANEL Participation, Accountability, Non Discrimination and Equality,
Empowerment, Legality
PBSW Prison Based Social Work
PCF Prisoner Complaint Form

Page 143

130 
PCF1 Prisoner Complaint Form 1
PCF2 Prisoner Complaint Form 2
PCMB Programme Case Management Board
PEI Physical Education Instructor
PEEP Personal Emergency Evacuation Plans
PER Prisoner Escort Record
PIAC Prisoner Information Action Committee
PIC Prisoner Information Channel
PMAG Prison Monitoring and Assurance Group
POs Personal Officers
PPE Personal Protective Equipment
PPT Personal Protection Training
PR2 SPS Prison Records System (version 2)
PRL Prison Resource Library
PTI Personal Training Instructor
RAG Red, Amber, Green
RGNs Registered General Nurses
RMN Registered Mental Health Nurse
RMT Risk Management Team
RRA Reception Risk Assessment
SBAR Situation Background Assessment Recommendation
SBR Suspected Bullying Report
SEB Shotts Employability Board
SICP Standard infection control precaution
SMT Senior Management Team
SOP Standard Operating Procedure
SPICT Supportive and Palliative Care Indicators Tool
SPS Scottish Prison Service
SPSO Scottish Public Service Ombudsman
SRU Separation and Reintegration Unit
SSM Special Security Measure
SSOW Safe Systems of Work
TTCG Tactical Tasking and Co-Ordination Group
TTM Talk To Me

Page 144

131 
UOF Use of Force
VIR Violent Incident Review
VRG Violence Reduction Group

Page 145

Total Recommendations ‐ 22
Total Open Actions ‐ 16
Priority Open Actions – 6
Closed Actions – 6
Appendix 1‐ HIS Review Recommendations Update 17th May 2023
HIS Priority Actions RAG Update
Recommendation 44: 
North Lanarkshire HSCP and the
SPS should work jointly to ensure
that transfer arrangements for
incoming prisoners are such that
they enable a nurse to review/TTM
assess all prisoners before they are
admitted to a prison 
A
Discussions have taken place with SPS Senior Management on site with an agreement where possible to
arrange transfers of prisoners into the establishment prior to the completion of healthcare staff shifts. This is
being monitored, and any deviation (i.e. where a prisoner arrives after healthcare staff have finished) will be
managed as agreed with the Governor in Charge (GIC). Prisoner assessed by SPS staff and placed on
observation until Healthcare staff can assess.
Clinical Manager/Team Lead will continuously review compliance with requirement for admissions
Healthcare screening, and any deviation will be escalated via the Datix system and highlighted on safety
brief, with immediate action to assess prisoner as soon as is possible CNM review current process for
admissions to ensure this is completed for all prisoners on transfer into to HMP Shotts. Data Collection
started 1st May – daily number of transfers/time of transfer/daily number assessed by Primary Care Team
(PCT) /daily number not assessed on the day. 
NB: There have been no prisoner transfers since 1st May 2023
Recommendation 48:
North Lanarkshire HSCP must
revise without delay, the process in
place when identifying long term
health conditions and provide
assurance that patients are
reviewed in line with what is
equitable in the community to
address health inequalities 
A
Team Meeting held to discuss staff development and responsibility for chronic disease management. CNM
delegated with assigning specialist areas to staff and researching training opportunities. Review current
process to identify long term conditions for all prisoners on admission to the prison as well as any changes in
their condition that may develop. Process to be devised to ensure prisoners with long term conditions are
reviewed in line with community guidance and this is clearly documented within patients notes. All prisoners
with a long term condition will have a person centred care plan and appropriate risk assessment    
completed. These should be reviewed and updated regularly.

Page 146

Recommendation 52:
North Lanarkshire HSCP as a
matter of urgency must review the
medical cover available in the
afternoons to:
(i) ensure the risk to patients is
reduced
(ii) support nursing staff in
dealing with emergency
situations 
A
The mechanism in place (staff contact the Flow Navigation Centre in afternoon hours with concerns about
patients) was reviewed, updated and re‐circulated to staff following the inspection. Consultant connect is
available as an integral part of this but has seldom been used or required. The Local Enhanced Service (LES)
specification has been developed with invitations to tender being sent to all GPs in NHSL. 1 practice
responded and met with the General Manager, Associate Medical Director and Clinical Director. 1 GP is
currently shadowing for greater contextual understanding of the role. Associate Medical Director, Clinical
Director and General Manager are also working on a contingency if this option does not result in an
approved LES.
Recommendation 57:
As a priority North Lanarkshire’s
HSCP must action the
recommendations made in their
service review regarding pharmacy
provision and support to provide a
service equitable with the
community. 
A
Prescribing processes and checks have been reviewed and checks are made regularly for accuracy and safe
prescribing. Review of Pharmacy admin staff roles will form part of a wider workforce review. The existing
staff who work in the pharmacy roles are supported by a senior Pharmacy Advisor from NHS Lanarkshire
who visits regularly and is integrated into appropriate forums etc. in the delivery of service. The National
Pharmacy Contract also provided senior pharmacist support on a weekly basis in the form of a site based
day. The implementation of the new national pharmacy contract has been agreed. Lloyds will cease their
contract on 30th June 2023. MD Green have been awarded the new contract. Weekly national meetings
are in place to project plan the changeover. ECOR is being progressed to recruit to pharmacy vacancy.
Recommendation 61: NHS
Lanarkshire HSCP and SPS must
ensure complaints forms are
available in alternative formats
and languages to ensure all
patients can provide feedback,
raise concerns and complain 
G
The 12 most utilised languages complaint forms have been developed. Discussions to take place with SPS
Head of Offender Outcomes to ascertain and agree the process for implementing these to prisoners as and
when required. Meeting arranged 17th May 2023.
Recommendation 65: North
Lanarkshire HSCP must demonstrate
implementation of recommendations
from service review and provide clear
pathways to support staff on site in
HMP Shotts in the absence of senior
staff 
A
There has been prolific senior management presence onsite since November 2022. Recruitment of the CNM
for PCT has been successful with a start date of 3rd July. Senior management support continues to be
provided until the CNM starts. The Improvement Manager has been in post since the 3rd April, is onsite  
most days and has well integrated links to the senior management team.

Page 147

HIS Non Priority Actions RAG Update
Recommendation 46: 
National co‐ordination and
discussion with partner agencies
(such as Police Scotland, Scottish
Courts, GEOAmey and SPS) is
required to ensure that people
arrive at prison during the prisons
core opening times or when
nursing resource is available 
A
Discussion has taken place with SPS Senior Management on site, with an agreement where possible to
arrange transfers of prisoners into the establishment prior to the completion of healthcare staff shifts. This
is being monitored, and any deviation (i.e. where a prisoner arrives after healthcare staff have finished) will
be managed as agreed with the GIC ‐ Prisoner assessed by SPS staff and placed on observation until
Healthcare staff can assess. CNM will continuously review compliance with requirement for admissions
Healthcare screening and any deviation will be escalated via the Datix system and highlighted on safety
brief, with immediate action to assess the prisoner as soon as is possible. Compliance monitoring and data
collection has begun since 1st May now the IM has started post however there have been no prisoner
transfers since 1st May 2023 due to issues with GEOAmey
Recommendation 56: 
North Lanarkshire HSCP must
ensure that person centred care
plans and appropriate risk
assessments are in place for all
patients with long term conditions
(LTC) and that these are reviewed
regularly 
A
A structure to identify and review patients with LTC has been developed and thereafter medical reviews will
occur as result of this structure with a recall system in place on VISION. Frequency of reviews will be decided
by medical staff based on need and any relevant guidelines. When staffing allows; allocation of
responsibility for chronic disease management will be conducted based on individual staff member’s skills,
experiences and development needs. Senior Nurse will via staff PDP identify these responsibilities and
assess issues such as training opportunities required

Page 148

HIS Non Priority Actions RAG Update
Recommendation 45:
North Lanarkshire HSCP must
develop a pathway to ensure
patients receive psychiatry follow
up when transferred, 
G
Link with the head/lead forensic psychiatrists Scottish Prisons and Community at all health boards to devise
a simple pathway to share that says a transfer letter from previous prison must be sent to SHOTTS pre
admission to allow appropriate follow up appointment to be booked with psychiatrist. To mitigate in the
short term, the mental health secretary will check vison/docman for every new prisoner transfer to ascertain
if psychiatry follow‐up is required for them. If it is the patient will be booked to our psychiatrist as per
instructions of their last psychiatric letter.
Recommendation 54:
North Lanarkshire HSCP must
introduce an electronic system to
record and update documents to
keep documents live and ensure
the most up‐to‐date information is
accessible. 
A
On an ongoing basis, there will be scoping of whether North HSCP can introduce an electronic system to
record and update documents to keep documents live and ensure the most up to date information is
accessible. Discussion has been ongoing regarding the potential introduction of the MORSE system 
At present a national, (and older) version of Vision is the main system in use across all HMPs in Scotland
Recommendation 55:
North Lanarkshire HSCP must
develop a pathway for accessing
specialist support in intellectual
disabilities, autistic spectrum
disorder, neuropsychiatric
disorders and cognitive
impairment. 
A
The service has no bespoke internal functionality for these disorders based at the prison, but any individual
with such presenting needs would be referred to the existing Lanarkshire services. This entails prisoner
patients having to wait an equitable period of time as the general public for assessment and any
interventions that such a referral may produce. Newly established ‘Lanarkshire’ pathways are in situ for
ADHD and Cognitive Impairment. 
There has been change in personnel in relation to the Senior Nursing position for Mental Health & LD. New
staff are establishing themselves now and will support with the further development of access for prisoner
patients to appropriate services.
Recommendation 58: 
NHS Lanarkshire's pharmacy
service must provide structured
and regular support to staff
involved in supporting pharmacy
services within HMP Shotts 
A
Review of Pharmacy admin staff roles will form part of a wider workforce review when the newly appointed
Project/Improvement Manager is in post. However, the existing staff who work in the pharmacy roles are
supported by a senior Pharmacy Advisor from NHS Lanarkshire who visits regularly and is integrated into
appropriate forums etc. in the delivery of service. 
The implementation of the new national pharmacy contract has been agreed. Lloyds will cease their
contract on 30th June 2023. MD Green have been awarded the new contract. Weekly national meetings
are in place to project plan the changeover. ECOR is being progressed to recruit to pharmacy vacancy.

Page 149

HIS Non Priority Actions RAG Update
Recommendation 59:
North Lanarkshire HSCP and SPS
must seek solutions to assist staff
to administer medication at a
suitable and therapeutic time 
A
Existing practices are made as safe as possible (SOP’s in place) by working in conjunction with SPS.
Development is planned between both organisations to change the administration of “Weekly” medication
as and when healthcare staffing enables this.
Recommendation 50:
North Lanarkshire HSCP must
ensure that all eligible patients
who wish to be involved in
national screening programmes
are supported to do so and that
this is clearly documented in
patients VISION record 
A
The service will ensure on an ongoing basis that prisoners are able to be included in national screening
programmes for Bowel cancer and AAA (If in the appropriate age groups). Currently prisoners receive their
own screening appointment letters directly (not via healthcare department). This is reliant on their
whereabouts being known. A National solution is required for this and NHS Lanarkshire will keenly
participate. If this process is required to be evidenced/audited, a system must be developed to ensure that
all appropriate patients have accessed screening by direct correspondence and that this is documented on
Vision. This will require prisoners to share these details.
Recommendation 53:
North Lanarkshire HSCP must
ensure that patients are able to
access national screening
programmes in line with
community provision and keep
accurate records of attendance 
A
As above
Recommendation 60:
NHS Lanarkshire HSCP should
consider the re‐introduction of the
oral health educator role to
support the dental service 
G
Oral health care team are updating PPT training with SPS on 22nd February 23 and will commence monthly
education visits once training completed in March. Service lead anticipates more frequent visits in future
plans. IM is meeting senior health improvement manager 17th May to discuss position and move forward

Page 150

HIS Closed Actions RAG Update
Recommendation 47: HMP Shotts
must provide a room that is clean
and clutter‐free at reception 
G
Interview/Assessment room in Reception area has been reviewed, has been cleared, is regularly cleaned and
is now fit for purpose.
Recommendation 49: North
Lanarkshire HSCP must implement
a system for secondary care
referrals that ensures patient
confidentiality is protected 
G
Immediately after the inspection a solution was found with use of secure e mail over surface mail as SCI
Gateway option was still being explored. SCI gateway infrastructure is now in place and went live on 11th
May 2023.
Recommendation 51: North
Lanarkshire HSCP must ensure that
checks on emergency equipment
are carried out within the agreed
timeframe and that these checks
are clearly recorded. 
G
Emergency equipment is checked regularly and documentation is signed to evidence this by healthcare staff.
CNM will complete random audits of documentation to ensure compliance.
Recommendation 62: NHS
Lanarkshire HSCP must ensure that
all staff managing complaints
receive training to ensure that all
complaints are correctly managed. 
G
The senior management team have reviewed all processes which now ensures the CNM onsite manages all
Stage 1 complaints. Full training has been issued.  Anything Stage 2 and above is escalated and managed via
the organisational process (Patient Affairs & General Manager).
Recommendation 63: NHS
Lanarkshire HSCP should develop a
process to discuss complaints to
share learning and identify any
themes or required
improvements. 
G
CNM has reintroduce monthly team meetings. CNM to chair with attendance from SM/SN to provide
additional info and communication from strategy group and operational issues. Standing Agenda items are
agreed with opportunity to add additional items. Items to include Infection Prevention & Control, Briefing
Notes, Datix's, Actions Plans & shared Learnings. Discussion, Action points and updates to be recorded in R
Drive.
Recommendation 64: NHS
Lanarkshire HSCP must ensure that
alternative and consistent IT  G
Immediately after the inspection a solution was found with use of secure e mail over surface mail as SCI
Gateway option was still being explored. SCI gateway infrastructure is now in place and went live on 11th
May 2023.

Page 151

solutions are provided to support
clinical staff as referrals by post is
a significant data breach

Page 152

Total Recommendations ‐ 32
Total Open Actions – 10
Total Closed Actions ‐ 22
Appendix 2 ‐Service Model Review Update 17th May 2023
Service Model Review Actions RAG Update
Recruitment and retention of staff 
A
Ongoing Open Day's planned 6‐8 monthly with SPS. Held on 2 occasions (Oct 2022 & Feb 2023). Shadow shift
project to engage with Lanarkshire Staffbank staff and promote experience in Shotts and allow for training of
temporary staff. Rolling adverts for Primary Care staff via national SHOW vacancy website. Attendance by
Practice Education Facilitators to Open Day and regular communication to facilitate Student/Mentorship in
prison setting once vacancy backfill allows for clinical supervision of students. Recruitment is on‐going.
Application made to STAC for Secure Environment Allowance for staff. Awaiting decision.
Clearly define roles and
responsibilities for each grade of
staff and identify development
opportunities 
A
Newly appointed seconded Team Leader/Clinical Nurse Manager (CNM) in post April 23 ‐ gaining access to
systems presently. 2nd CNM appointed with a start date of July 23.
Develop monthly service
development meetings with the
MDT  G
Improvement manager will set up monthly improvement group meetings with the senior team and teams
within the HC. The first meeting is set for 24th May within the HC. A staff experience questionnaire has been
sent to all staff for completion. Results will be presented at the meeting.
Student Feedback 
A
Practice Education Facilitator for Shotts has changed early 2023 and we are engaged with team to facilitate
training for current and future Primary Care team staff to bring suitable students into the learning
environment. Currently we need more registrants in the team to support student plans.
Completion of Mandatory and
Compulsory Training for all staff  G
Rolling programme of training and education affected by turnover of staff and current vacancy level. All staff
aware of personal responsibility for skill and training requirement. Seconded CNM gaining access to TURAS
and EESS platforms. Skills Bus has been delayed from Nov/Dec 2022 however team has been contacted again
to provide dates.

Page 153

Develop an electronic staffing
roster on MS Teams  G
All staff will have visibility to this for transparency, any amendments made are audited allowing staff to
trace/track all changes. Await the new PCT CNM to commence post in July then discuss and agree on the
roster format.
Review of addictions pathway for
released prisoners  G
Addictions Charge Nurse invited to share current pathway with Drug Death Task Forum. This group is due to
meet on 23rd July 2023
Water outlet not been utilised 
G
Outlets have been removed and room is ready for preparation to store room facility. Seconded CNM is
reviewing requirements to push work forward.
Patient Feedback 
A
Health Improvement advisor based at prison has confirmed the restart of Satisfaction Questionnaires from
April 2023. Dates for focus groups yet to be confirmed. Health Improvement advisor left post in April ‐ eCOR
to be raised to backfill and continue this work.
Training in relation to End of Life
Care  G
Anticipatory Care Planning (ACP) training/refresher for staff to be arranged •Staff to complete Lanarkshire
ACP training module on learn pro. Confirmation of death training to be arranged for all appropriate staff.
Clinic team to develop a pack containing appropriate and relevant resources that can be shared with
bereaved families.

Page 154

Service Model Review Closed
Actions
RAG Update
Robust process for monthly NMC
Registration checks for Registered
nurse to be established  G
Robust monthly process implemented by Senior Nurse, and undertaken by CNM as routine monthly task.
Proactive approach to reminding staff that Registration fees are due for renewal. Proactive approach to
ensure staff undertake Revalidation exercise timeously and in advance of due date for sign off.
Introduction of Daily Safety Brief 
G
Template for safety brief updated, agreed and implemented. Morning safety brief being completed by
Primary Care Team at beginning of shift and electronic copy saved in R‐drive. Introduction of 2pm verbal
briefing started 8th May 2023 by CNM, includes MDT representation.6pm Safety handover completed by PCT
Nurse on duty at end of working day. Emailed to colleagues and Senior management team for info
Introduction of a Monthly Health
Centre Team/Service meeting
G CNM re‐commenced these meetings in April 2023
Staff Health & Well Being 
G
Discussion with SPS staff at Strategy group ‐ unable to provide alternative rest area but staff can utilise
facilities at main reception for breaks, this also includes use of Gym facilities. Staff breaks extended to
include time to walk to main reception if staff wish to utilise this area. Weekly staff email bulletin includes
up to date information for all staff re how to access staff health and wellbeing facilities.
Radio chatter distraction to staff 
G
Discussed at Strategy Group, and agreed clinical staff should remove ear piece when issuing medication.
Communicated this to staff.
Health & Safety 
G
Control Book reviewed end of November 22 with Action Plan issued. CNMs tasked with completion and/or
delegation of tasks. Control book reviewed and on continuous review and update as risk assessments are
required.
Psychological Safety G iMatters survey due reviewed July 2023 as annual plan. Psychological survey carried out with staff for
anonymous feedback ‐ will be repeated at regular intervals in the calendar year.
Develop guidelines in relation to
SPS purchased social care services 
G
Senior professional & operational management have raised concerns to SPS at joint NHSL/SPS strategy
forum. SPS did not share concerns expressed, but agreed to further investigate individual episode of alleged
suboptimal care. NHSL will continue to raise concerns if required using appropriate medium. Individual
investigation was investigated and concluded to NHSL satisfaction.

Page 155

Competent witness training G Register of all staff completing Competent witness training now being completed and CNM responsible for
ensuring this is kept up to date. PDD to be contacted by SN to request review of training pack. Discussion
completed with Practice Development.
Review of kardex's G Process in place with regular review and re writing of medication kardex (Prescription sheet).
Missing kardex’s within pharmacy 
G
Test of changed developed and instated by way of sign in and out tracer card within pharmacy to reduce
time wasted searching for kardexes when they are not in their allocated folder or with the GP.
Completion of hand Hygiene learn
pro module annually by all staff  G
Learn pro hand hygiene module records are held in this database and are being updated by CNM monthly.
CNM is completing 10 hand hygiene audits each month with team and submitting on Monthly Highlight
report for North hygiene group. Request to CNM for all completed audits to be recorded monthly on LanQIP
‐now completed onto LanQIP system
Ensure all staff are fully aware of
appropriate use of Personal
Protective Equipment (PPE) 
G
Winter Respiratory guidance and posters shared with CNM by SN. Request to share with team as well as
posters to be displayed in all clinical areas. SN re‐shared Winter Respiratory guidance with all staff, including
Respiratory questions and Quick Reference pathway which fully outlines appropriate use of PPE. 
Above guidance now added to admissions paperwork and staff now complete the questionnaire for all
prisoners transferred into HMP Shotts during the admission process 
Prompt added to Daily Safety Brief as well as discussion at Morning safety handover to ensure all staff were
fully aware of update. SN ensured posters were visible in relation to this guidance in health centre area for
staff reference
Ensure all staff fully aware of local
guidance re cleaning and
decontamination of environment
and equipment 
G
A‐Z Decontamination checklist shared by Senior Nurse (SN) to CNM and request for this to be completed as
applicable. SN shared laminated posters with staff with instructions on use of appropriate cleaning agents‐
request for these to be displayed in Health centre area for staff reference.
Cleaning schedules are available in all clinical rooms and staff are aware re completion of these at end of
each room use.

Page 156

Completion of monthly SICP's
audits as per SICPs Monitoring
Audit Programme 
G
Monthly SICP'S audits are completed by CNM, reported and submitted on Highlight report for collation by
SN. SN shared annual SICP'S Monitoring audit programme with CNM. Request to CNM that all SICP'S audits
are recorded on LanQIP when complete‐ this is now being actioned. 
Scottish Infection Control Education Pathway added to staff learn pro training scorecards for completion by
all appropriate staff and record of completion will then be available for CNM to review. CNM will ensure staff
complete.
Poor compliance by all patients
with PPE guidance and physical
distancing 
G
This advice continues to be reinforced for all patients attending Health centre area.
Ensure all staff fully aware of
national and local guidance in
relation to infection prevention
and control 
G
Winter Respiratory guidance and posters shared with CNM by SN, Request to share with team as well as
posters to be displayed in all clinical areas. 
SN re‐shared Winter Respiratory guidance with all staff. This included Respiratory questions and Quick
Reference pathway which fully outlines appropriate use of PPE 
SN shared IPC team contact details as well as email link to IPC guidance for staff use by email as well as
laminated posters displayed in health centre area for staff reference when required.
Ensure all sharps bins are
temporarily closed 
G
CNM has discussed this with staff and is ensuring all staff are fully aware of how to temporarily close Sharps
bins and correct labelling of bins. 
SN shared appropriate signage re Temporary closure of sharps bins with staff and request to display these in
all appropriate clinical areas where sharps bins are used.

Page 157

Cancellation of patient transport   
G
Database is being completed and updated daily to record any Geo‐amey cancellations. CNM is ensuring all
cancelled appointments are reviewed daily to prioritise need for re‐appointment for individual prisoners. All
cancellations appointments are reviewed by clinical staff and prioritised when requesting re‐appointments.
Review of joint NHS Scotland and
SPS MORS Policy   
G
Discussed at local strategic meeting with SPS Staff and agreement that SPS staff should always action request
from NHS staff to commence MORS Policy. NHS staff should escalate to Governor/Deputy Governor if any 
SPS staff refuse to commence MORS policy when requested.  National review of MORs policy on‐going. SPS
and Healthcare work in collaboration to review safety of patients.
Ongoing national discussions regarding MORS. 
Appropriate use of ACP 
G
SN shared updated copy of ACP booklet as well as the ACP Guidance for Health Professionals. CNM to share
and discuss appropriate use of this with team. Staff to consider use of ACP booklet when indicated for
individual patient completion.
Review current escalation process
for deteriorating patients 
G
Training completed in 2022 for staff however change of staff will mean more training later this year. Closing