North Lanarkshire Council · 21 June 2023
Back to IJB Performance, Finance and Audit Committee — 21 June 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

A meeting of the Performance Finance & Audit Committee will be held on 
Wednesday 21st June 2023 at 9.30am-12pm via Microsoft Teams 
If anyone would like to join this meeting, please contact Stacey Connor on 01698
752594 or by email at Stacey.Connor@lanarkshire.scot.nhs.uk for the relevant
information.                     
AGENDA  
CHAIR: Brian Moore 
No  Time  Item  Action  Attachment Reporting 
1.    Welcome and Apologies     B Moore
2.    Declaration of Interests  Members are invited to declare
any interest in relation to any of
the agenda items
Board
Members
3.    Minutes  Performance,
Finance & Audit Committee
(19th April 2023)
For 
Approval 
Attachment B Moore
4.    Matters Arising - Action Log For 
Approval  
Attachment R
McGuffie 
GOVERNANCE 
5.   P,F & A Risk Register  For Noting  Attachment R McGuffie  
FINANCE & AUDIT 
6.  Unaudited Annual Accounts For
Approval
Attachment A Kilburn
7.  Internal Audit For Noting Attachment A Kilburn 
8.   Financial Monitoring  For
Approval
Attachment  A Kilburn 
PERFORMANCE 
9.  Resilience Paper  For Noting Attachment R
McGuffie
10.  Prisoner Healthcare For Noting  Attachment M
Thomson
11.  Alcohol & Drug Partnership
Annual Report
For Approval Attachment R
McGuffie
12.  Equality Outcomes and
Mainstreaming Report
Update
For
Endorsement
& Noting
Attachment M
Williamson

Page 2

13.  Q4 Performance Report For Noting Attachment R
McGuffie
14.     Risk    Consider whether, from the
business discussed, any new,
emerging risks need to be added
to the  Risk Register, or whether
the discussion materially alters
the assessed level of risk/risk
tolerance and/or the mitigating
controls 
B Moore
15.    Date of Next Meeting: 
18th October 2023
9.30am-12.30pm

Page 3

1 
ITEM 3                             Integration Joint Board
Performance, Finance & Audit Committee 
Minutes from a meeting held on Microsoft Teams
on Wednesday 19th April 2023 9.30am-12pm 
Present:  
Voting
Members:
Councillor Claire Barclay
Proxy for
Councillor Gerry Brennan
North Lanarkshire Council Nominated Councillor 
Ally Boyle NHS Lanarkshire Nominated Non Exec Director 
Councillor Bob Burgess North Lanarkshire Council Nominated Councillor 
Phillip Couser 
(left 10.25am)
NHS Lanarkshire Nominated Non Exec Director 
Councillor Paul Kelly
(Left 10.15am) 
North Lanarkshire Council Nominated Councillor 
Councillor  Ayeshah
Khan
North Lanarkshire Council Nominated Councillor 
Brian Moore (Chair) NHS Lanarkshire Nominated Non Exec Director 
James Muir NHS Lanarkshire Nominated Non Exec Director
Non-Voting
Members in
Attendance  
Professional
Advisors:
Amanda Kilburn Section 95 Finance Officer 
Ross McGuffie Chief Officer, North Lanarkshire HSCP
Stakeholders: Harry Robertson North Lanarkshire Carer Together 
John Watson Unison Rep 
In
Attendance:
Stacey Anderson Support Services, Project Manager 
Stacey Connor
(Minutes)
Minute Secretary 
Mark Dell Communications Manager 
Morag Dendy Head of Planning, Performance & Quality 
Maddy Halliday Chief Exec, VANL
Third Sector Rep 
Dr Lucy Munro Medical Director North HSCP 
Elizabeth Seaton Partnership for Change
User Rep 
Maggs Thomson Head of Health NHSCP   
Apologies:  Paul Carey Audit Scotland 
Diane Fraser Head of Adult Social Work Services 
Cathy McGinty Unison Staff Side Rep (NHSL) 
Trudi Marshall Nurse Director North HSCP

Page 4

2 
ACTION 
1. Welcome and Apologies 
The chair welcomed everyone to the meeting and introductions were made;
apologies were as noted above. 
2. Declaration of Interests      
It was noted for Item 13 Brian Moore and other non-executive directors are
part of the NHS Lanarkshire endowment committee which allocates funding
for the social prescribing initiative. This was noted. 
3. Minutes     
The previous minutes were approved as an accurate reflection of the
discussion. 
4. Matters Arising/ Action Log     
Under matters arising Brian Moore queried if a summary report for the annual
report will be available. Ross McGuffie advised required reports will be
published on the new HSCP website. Morag Dendy added the summary
report is not finalised but it will be soon. 
Ross McGuffie advised Stacey Anderson is undertaking a review of action
logs for both committees to streamline reports and update the  action logs. 
The Liaison Sessions were first established to bring voting members
together as an organisational development session but this has now moved
towards more of a workshop session. Membership for liaison session will be
extended to all members of the IJB. 
Item 18- IJB Self-Assessment Report- The work has identified a number
of actions which are included as part of the progress report. Best value audits
were previously stood down due to National Care Service work but are now
expected to be reinstated. 
Item 22 MH Strategy- Will come back to liaison session and this is the final
year of the current strategy so this will be reviewed in due course. 
Ross McGuffie also advised there is a new date for a liaison session in May,
the main agenda item being  human learning systems. Morag Dendy advised
she have been able to secure a range of events through NES which
commence this week to develop the process. Maddy Halliday advised that
the community solutions programme has learning and improvement work
across the programme which could feed through to HSCP going forward.
This was noted.

Page 5

3 
5. PF & A Risk Register     
The purpose of the report is to provide a summary to the Integration Joint
Board on risk management activity, noting any amendments or additions to
the current risk register. 
Following discussions at the last meeting of PFA on 14th February 2023,
there has been a number of changes in the risk register: 
 3 risks closed:
o IJB 03/21 – EU withdrawal
o IJB 08/21 – Financial Implications of Covid
o IJB 09/21 – Impact of pandemic on implementation of the strategic
plan 
 1 risk increased:
o IJB 06/21 – Prescribing – increased due to the projected increased
costs facing the partnership in 2023/24 
  2 new risks identified:
o IJB 19/23 – Service sustainability – a broader risk on sustainability
challenges, replacing previous risks on EU withdrawal and Covid
o IJB 20/23 – Workforce sustainability – a broader risk on
sustainability challenges, replacing previous risks on EU withdrawal
and Covid 
There are currently two risks rated as Very High on the IJB risk register.
  IJB 06/21 – Prescribing Activity and Costs
 IJB 17/22 – Unscheduled Care
There are eight high rated risks on the IJB risk register.
 IJB 01/21 - Financial Challenges
 IJB 04/21 - Notional Set Aside Budget
  IJB 12/21 - Staff Health & wellbeing
 IJB 14/22 – CAMHS
 IJB 15/22 – Cost of Living
 IJB 16/22 – National Care Service
 IJB 19/23 – Service sustainability
 IJB 20/23 – Workforce sustainability. 
Ross McGuffie advised Stacey Anderson and Maggs Thomson have been
working with Charlotte Hope (Corporate risk manager at NHS Lanarkshire )
to develop a new reporting template for risk reporting to the committee.
This will also be looked at in more detail as part of the risk workshop at a
future liaison session. Cllr Ayeshah Khan reminded the committee to be
mindful of not using jargon within the risk reports; this was noted. 
Philip Couser referenced risk 20/23 (workforce sustainability) and queried
what is the background to this risk to offer the committee assurance. Ross
McGuffie acknowledged there are areas of pressure across a number of
service areas due to recruitment challenges but this is a national issue.

Page 6

4 
Trudi Marshall added that during covid the professional governance
structure were redeployed to firstly support pandemic and then to support
the firebreak and vaccination programme, which means there are gaps in
the governance process due to this; have tried to mitigate the risk where
possible. 
The IJB PFA agreed the following recommendations: 
Noted the contents of the report which includes the
latest version of the IJB PFA risk register and a note of those operational
risks highlighted by the Heath & Social Care North Lanarkshire partnership
that impact upon delivery of IJB business.   
6. Financial Monitoring Report     
The financial monitoring report provides a summary of the financial position
of the North Lanarkshire Health and Social Care Partnership (HSCP) for the
period from 1 April 2022 to 3 February 2023. 
The IJB year to date position is an underspend of £15.332m and the
projected outturn for 2022/23 is an underspend of £17.264m, assuming the
current trajectory of spend continues throughout this financial year. 
The key reasons why the IJB is currently projecting an underspend against
its budget this year are as below: 
•    Employee Costs net underspend of £12.323m: as previously highlighted
there are ongoing challenges in terms of recruitment and retention issues
across all service areas.  For a wide range of posts recruitment has been
unsuccessful due to the availability of the skills mix required or the
competition being offered by other private and public sectors. These are
issues that are being faced by IJBs across Scotland. 
•    Home Support net overspend of £0.541m: within Home Support Services,
employee costs have increased as the service continues to support delayed
discharges and demand however, this additional cost is being funded from
the current number of vacant posts throughout other parts of the partnership. 
•    Payments to Other Bodies net underspend of £2.840m: the underspend
is primarily due to the staff shortages and vacancies within the Care at Home
sector who provide services to individuals via the self-directed support
commissioning framework.  There is also an underspend in package costs
due to slippage in Self-Directed Support (SDS) start dates. It is anticipated
these are in-year underspends only and the full budget will be required in
future years. 
•    Independent Care Homes net overspend of £0.788m: there are currently
1,461 care packages within this service however when the budget was set
for this financial year, it was based on 1,361 care packages.  This has
resulted in the service experiencing a pressure on the current allocated 
budget.

Page 7

5 
•    Admin Costs net underspend of £1.884m: within the carers funding there
is currently an unallocated budget of £1.8m. The anticipated underspend is
reflective of the part-year implementation of contracts and additional funding
from the Scottish Government for carers pressures in 2022/2023.  As these
pressures become evident within social care budgets, the funding 
will be moved to the relevant care package. 
•    Prescribing net overspend of £0.500m: activity and cost per item within
prescribing is 2.69% higher compared to the same period last year. Due to
the uncertainty around costs and prescribing activity and the three-month
time lag in receiving the data, the volatility experienced within prescribing is
likely to continue for the foreseeable future. 
The current IJB reserves position for 2022/23 is a revised balance of
£69.237m. 
James Muir asked is the vacancy trend rate increasing or decreasing, can
more data be included to offer assurance. Amanda Kilburn replied the
challenge is when recruiting when someone starts the likelihood is someone
else will leave due to a number of reasons. More data will be included in the
year-end report to offer some assurance. Ross McGuffie added trend rate is
dependent on each services, although overall the 7% is reasonably static.
When the organisation receives new funding sources staff move around the
system to more attractive posts which creates vacancy issues in other
services. 
Trudi Marshall acknowledged nursing is the largest workforce to add to the
figure and advised that  not all university places were filled last year  which
will impact on future recruitment. There is work being undertaken to look at
new roles at band 4 level to sit under registrants, placements and careers
fayres are also being planned. Ross McGuffie added that we produce an
annual workforce plan which can be brought to the committee to offer a
deeper dive; this was noted. 
Ally Boyle asked that for services with higher agency spend are there
processes in place to manage and reduce this. Dr Lucy Munro noted agency
spend in Mental Health is mainly on medical  cover and all mitigations are
considered before agency usage. 
Brian Moore noted the existing reserve under digital and IT strategy for home
support scheduling tool and asked if we have a timeline or plan in relation to
committing the funding. Ross McGuffie advised have now completed
procurement process for SWISS programme which will take 12-18 months
to fully implement. 
Brian Moore also queried, with regarding to in year allocations,  if  alcohol
and drug funding is  new . Ross McGuffie confirmed this is not new money
and it is as expected.

Page 8

6 
Brian Moored note if we haven’t committed money in reserves it will impact
on future Scottish Government future funding allocations, he asked is this
the case. Ross McGuffie advised looking at maximising funding already
available where possible.
The IJB PFA Committee agreed the following recommendations:
(1)     Note the contents of the report; and
(2)     Note the financial position is a year-to-date underspend of £15.332m.   
7. Progress Report   
The progress report provides an outline of the actions agreed with the
External Auditor, internal Audit, and the Senior Management Team to further
develop the IJB governance framework. 
An update on the progress made to date was reported to the PFA Committee
on16 November 2022.  A summary of the current position statement is
shown in the table below: 
Source Total Actions Completed Actions Ongoing Actions
External Audit 5 4 1
Internal Audit 5 4 1
Senior Management 6 5 1
Total 16 13 3  
81% 19% 
The results of the self-evaluation exercise were presented to the PFA
Committee on 31st  August 2022 with the main improvement actions being
identified as follows: 
•    Evidence how Health and Social Care spending contributes to prevention
and early intervention;
•    Embed learning and new ways of working in the IJB from the response
to the pandemic to ensure 
plans and governance are fit for purpose; and
•    Review how performance information is used by the IJB to ensure it is
timely, relevant and 
provides a good measure of progress towards agreed outcomes. 
Ally Boyle suggested to include more narrative to advise the delays in actions
is due to other factors; this was noted. 
Brian Moore referred  internal audit actions relating to risk processes and
requested further assurance regarding the actions.. Amanda Kilburn will
review actions and provide more assurance where possible. 
The IJB PFA Committee note the following recommendations:
(1)     That the content of the report is noted; and

Page 9

7 
(2)     That further progress reports will be presented to future meetings of
the PFA Committee in respect of any ongoing actions. 
8. Resilience Update         
NHS Lanarkshire stood down its Live Covid Incident in January 2023,
however, the operational pressures emanating from the pandemic recovery
have been pronounced, with NHS Lanarkshire in Black status since 27th July
2022. 
Operation Flow was developed to create a ‘firebreak’ to rapidly reduce
hospital inpatient capacity, then creating the staff capacity to work on service
redesign to bring the system as a whole back into equilibrium. 
Following the 9-day firebreak, hospital inpatient capacity reduced by around
15% across Lanarkshire, supporting the system to move from black to red
status on 6th March 2023. 
The North HSCP has held a feedback session based on the Firebreak
activity and dedicated time at the Strategic Leadership Team to further
review the learning so far. A number of key themes have emerged, including: 
 Significant gains in whole system partnership working from the
Firebreak
 The ever increasing role of Home Assessment Teams in supporting
discharge and also controlling future demand into mainstream Home
Support services
 The need to better steward referrals for equipment
 Hospital at Home’s extended hours (to 8pm) led to the safe
management of a larger caseload of patients, with significant
increases in referrals received
 Interim Care needs to continue as part of the Choices Protocol for
Care Home admission and also to support any Localities struggling
with Care at Home capacity
 The discharge process is complex, bureaucratic and time consuming
and needs to be streamlined across the system
 We use multiple (largely paper based) systems to record the
discharge journey, that means there is never one version of the truth
and makes joined up working more challenging
 Trakcare isn’t updated frequently enough, with the example of 238
delayed discharge bed days being recorded on the system despite
the patients already being discharged
 Further work required to consistently implement the Flow Bundle,
including developments such as Planned Date of Discharge and
Criteria Led Discharge

Page 10

8 
One of the key aims of the Firebreak was to utilise multi-agency teams to
review all inpatients on a daily basis, with the aim of improving the flow of
the 95% of patients who don’t need supported discharge, but also supporting
earlier identification of the 5% who will require support. 
However, despite the spike in demand, the recently improved performance
in delayed discharge has been maintained. At the start of the firebreak, there
were 84 delays in the system, with 40 of these on the acute sites, and at 31st
March, this has reduced to 69 delays, with 26 on the acute sites. On 20th
March, the HSCP had its lowest recorded number of delays since November
2021 at 59. 
There has been agreement to establish SLWG working groups in the first
phase to look at learning. Before phase 2 commences to review the winter
plan with a focus to take learning from operation flow and discharge events
to develop the plan. Phase 3 will be the longer term work. 
Brian Moore asked how significant are the equipment delays to the
discharge process. Ross McGuffie replied it is sometimes due to over
ordering of equipment. Lanarkshire has more hospital beds in the community
than across the acute sites. This comes down to education of staff to
consider what they are ordering and requirements. There is a whole system
review being undertaken of the equipment sources to identify any actions
required. 
The IJB PFA:
(1)     Note that NHS Lanarkshire stood down its Covid Live Incident down in
January 2023, though 
command structures have been adapted to continue to focus on ongoing
wider resilience challenges, 
specifically, around service pressures
(2)     Note that NHS Lanarkshire was able to move from black to red status
on 6th March 2023, 
following a successful ‘firebreak’ as part of Operation Flow   
9. Q3 Performance Report 2022/2023 
This report is to provide an update to the Committee on the areas for
improvement which have been identified as part of the Quarterly
Performance Review for the period 1 October to 31 December 2022 (Quarter
3). 
Report covers the following performance areas:
 Cervical Screening
 Immunisations
 Delayed discharges/home support and reablement
 Integrated equipment and adaption services
 CAMHS
 Psychological therapies

Page 11

9 
 Adult mental health
 Waiting times performance- medical children and young people
 Waiting times performance AHP and community services
 Stop smoking service
 Sickness absence 
Cllr Ayeshah Khan asked are we on target to clear CAMHS waiting lists
backlog in summer time and is there any proposals  to have mobile units for
cervical screening appointments. Dr Lucy Munro advised by autumn time at
the latest the waiting lists will be significantly reduced, need to consider who
would use this capacity and also monitor if there is an increase in referrals
to the services due to this additional capacity. 
Cllr Ayeshah Khan drew attention to 3rd sector involvement as an earlier
engager with patients for prevention. Maddy Halliday agreed with this point
and noted concerns with funding if not available in 3rd sector difficult to
manage and asked where do strategic discussions take place. Dr Lucy
Munro stated there are other supports available outside of CAMHS that
patients can use. 
Morag Dendy advised that  a new performance manager is in post and a key
part of their role will be to align performance reporting  work undertaken in a
collective way. Maggs also noted that the programme board was established
to bring RTT back into line and has a specific directive to achieve this. She
also added CAMHS is also part of the MH strategy work so strategic
discussion will occur as part of the MH workstreams. 
Ally Boyle asked are we starting to get intelligence on DNA reasons which is
nearly 25% in CAMHS. Dr Lucy Munro advised some do not attend
appointments as they no longer require the service.  She advised that this is 
emerging data but needs to be looked at in more detail and that we require
processes to follow up with those who DNA appointments. Maggs Thomson
acknowledged that there is  an issue around the data with Scottish
Government which is being worked on. 
The IJB PFA Committee noted the contents of the report and its
appendix.   
10. Speech and Language Therapy Update     
Pre-Covid performance against the waiting times target of 90% of children
seen within 12 weeks for specialist intervention was 67%. In March 2020 all
routine SLT CYP services were paused and schools and nurseries closed.
In June 2020 all routine clients/families were contacted, further risk
assessment was carried out and families offered support. Waiting times
performance in July 2020 was 4%. 
The service in clinics schools and nurseries recommenced from June to
October 2020. Waiting times performance in February 2023 is 24%.

Page 12

10 
The SLT CYP service have had temporary funding to March 2023 to recruit
a further 12 posts in community SLT teams. Staff have been recruited to
these posts, however due to staff turnover the SLT CYP service has at no
time been over- establishment for the past 2 years. 
Maggs Thomson advised met with Strathclyde University to improve
undergraduate programme to help attract some additional staff to the
service. 
Cllr Bob Burgess noted concerns for maternity leavers do they eventually
come back to the services or do we lose the skilled staff. Maggs Thomson
noted this is a nationally funded programme, starting to see less applicants
leading to posts going to clearing positions. She also confirmed that staff
do come back to the service after maternity leave. 
Brian Moore noted it would useful in the next year to get another dedicated
report; this was noted. He also noted issues around track care access.
Ross McGuffie advised he has been discussing with IT the need to
prioritise access for community services to track care. 
The IJB PFA agreed the following recommendations:
1. The IJB approves that mobilisation funding is extended to 2023-24
financial year to enable appointment of SLTs over-establishment of up to 6
WTE band 6 posts.
2. The IJB endorses the formation of a SLT Service Improvement Group
with wider stakeholder engagement and support from Project Management
and Service Improvement manager within the SCHSU.   
11. OT Paediatrics Update     
Performance Background: 
The CYP OT Team have seen a 24% increase in demand post pandemic.  
Throughout the pandemic the team developed a wide variety of universal
and targeted video resources and information packs to support children and
families to access early therapy information and advice.  This supported the
service to absorb the increased demand and remain within the 12 week
target until April 2022.   
National developments within CAMHS and Neurodevelopmental Services
in 2022 resulted in a migration of experienced CYP OT staff to these new
services.  A total of 9 staff at B6 – B8a moved on from the service (7.0 wte
to the NHSL Neurodevelopmental Assessment & Diagnostic Service; and 
1.2 wte to NHSL CAMHS. 
There is currently a 28% vacancy factor within the CYP OT Team at Feb
2023.  This picture is replicated across many Board areas, and there is
currently a national

Page 13

11 
challenge in the recruitment of experienced CYP OT.  Locally, recruitment to
Band 5 CYP OTs has been successful, but the staff require support to build
their skills in this specialist area as OT practice based learning placement
have been reduced across children’s services. 
All open cases have been transferred to the remaining CYP OT staff,
reducing the ability to address new patient assessments, and impacting
negatively on waiting times performance. 
It is predicted that the NHSL CYP OT Service will breach the locally agreed
waiting times performance target over the next 6 months due to the national
recruitment challenges of specialist and experienced CYP occupational
therapy staff. However, the application of the performance recovery plan
noted in the report, and progression of recruitment opportunities will be
progressed to optimise performance and progress towards the 12 week
waiting times target. 
Brian Moore noted it would be useful to get a yearly update on how the
service is progressing; this was noted. 
The IJB PFA Committee:
(1) Recognise the current demands on NHSL Children & Young People’s
Occupational Therapy Services
(2) Approve the enclosed mitigating actions to manage service demand and
work towards the achievement of the agreed waiting times performance
target   
12. Digital Alarms     
This report informs Committee of the current position in relation to the
Community Alarm Service, particularly describing the drivers for undertaking
a review of the service and anticipated outcomes; and the Service’s
transition from an Analogue to Digital infrastructure. 
In 2020, as part of the centralisation of Care at Home, the service was
relocated to the Dalziel Building to sit alongside the centralised Home
Support Service, strengthening links and connections. Because of the
responsive nature of the support offered through Community Alarms, as well
as providing core service it also provides resource to support the Home
Support Service, particularly out of hours, as well as significant support to
the Social Work Emergency Service. The reach and stretch of the service
requires a review of the operating model. 
By 2025 all analogue telephone services in the UK will be switched off and
replaced by digital systems using internet protocol (IP) technology.
Telecommunication suppliers are well on the way to making this switch to IP
networks. Scotland’s telecare service providers including health and social
care partnerships, housing associations and many other organisations who
use analogue connectivity to deliver their services, need to upgrade.

Page 14

12 
North Lanarkshire Health and Social Care Partnership (NL H&SCP) and
North Lanarkshire Council (NLC) have invested significantly in early
intervention and supported self-management for over a decade, with support
for change and investment across all sectors which focus on wellbeing. The
Community Alarm Service is a key part of supporting self-management with
technological advancements creating the opportunity to move from being a
crisis response service to being more proactive and preventative. 
The above circumstances summarise the importance of the Community
Alarms Service, the changes to the digital infrastructure and need to review
the operating model for the service. A review of the Community Alarms
Service will develop options for the future service model that capitalise on
new ways of working using digital technology, to establish community alarm
and telecare services that are person-centred, and outcome focused, and
support the achievement of the priorities and ambitions of the North
Lanarkshire Health and Social Care Strategic Commissioning Plan 2023-26. 
Cllr Claire Barclay noted for 20% of alarm activations it results in someone
requiring to attend a patient so for 80% they are activating for other reasons,
is there some data on why they are being activated and if there are other
routes which can be used. Morag Dendy acknowledged that the service is 
looking into this data in more detail currently. 
Cllr Bob Burgess asked will the new technology cost more money to patients,
are there any issues with complexity of technology for the 7500 people listed
and does this include partners. Morag Dendy advised previously had 10000
listed in reports as using the services previously but the figure is actually
7500, this is for the unit rather than the number of people supported. The
expectation is the technology should be much easier and responsive for
users. There will be an increased cost going forward but it is not decided
who will cover these costs. 
Ally Boyle noted the new technology is not able to interface with smoke
alarms which the old system previously did, so we need assurance going
forward for those that require assistance they will receive this. It was noted
that we need a solution as part of the transition process which is clearly
communicated. Morag Dendy noted this has been flagged at a national level
and we are considering if community alarms are the right response to assist
those in this situation or if something else is required. Morag will ensure
transition arrangements are communicated clearly and add update to action
list to ensure work comes back when ready. 
Recommendations noted by the IJB PFA committee are as follows: 
(1) Acknowledge the contents of this Community Alarm Service Report.
(2) Acknowledge the work being undertaken to ensure a seamless transition
from analogue to digital and the work to date.
(3) Acknowledge the progress to date and work ongoing regarding the
Community Alarm Service review including the review of co-dependent

Page 15

13 
services, particularly Home Support Out of Hours provision, Social Work
Emergency Services and Registered Social Landlords.
(4) Acknowledge that recommendations will come back to the committee for
endorsement from the review.   
13. Community Solutions Annual Report     
The Community Solutions Annual Report 2021-22 is presented to North IJB
PFA for information and comment and, if appropriate, approval and/or
referral to the IJB. The Report provides the following information:
 Background to the programme with reference to the new Community
Solutions Strategy and Investment Plan 2022-25.
 A summary of performance and impact during 2021-22 with further
detail provided in Appendices. The report provides high level
summaries of: overall investment through the programme for 2021-
22 £3.6million
 key programme developments
 performance and impact of funded projects including:
o reach in term of unique individuals
o number of activities/services provided with examples
o personal outcomes (with a few exceptions where it was not possible for
funded projects to capture this information – e.g. Community Transport.) 
 An overview of priorities for 2022-23 and progress as of March 2023,
which are very positive and significant. Highlights include:
 development and agreement of the exciting, new Community
Solutions “Improving Lives Initiative”
 successful recommissioning of the Community Solutions Locality
Hosts
 development of a new Community Solutions Performance
Management, Evaluation, Learning and 
 Improvement Framework for implementation from April 2023, which
will improve the quality of 
 information captured and shared through the programme. 
Maddy Halliday will share summary document with the committee after the
meeting. 
Cllr Ayeshah Khan noted figure missing in locally activity fund. Maddy
Halliday noted this has not been fully agreed yet as part of an SLA but should
be confirmed soon this is why it was not included. 
Brian Moore asked for some consideration to include financial information
as an appendix in more detail in future. He asked where are we in relation to
recruitment challenges. Maddy Halliday advised do report to governance
group with more details around the budget which can be shared going
forward. There are 2 critical posts which are on temporary contracts awaiting
SLA to be able to fill permanently.

Page 16

14 
The IJB PFA Committee comment and note on the Community
Solutions Programme’s 2021-22 Annual Report.   
14. Risk 
There was no new risk identified by the committee.     
15. Date of Next Meeting     
21st June 2023
10.30am-12pm

Page 17

1 
ITEM 4 North Lanarkshire Integration Joint Board 
ROLLING ACTION LOG 
NO  DATE  ITEM NO  DESCRIPTION  ACTION BY  ACTION & PROGRESS  DUE DATE  COMPLETION
STATUS
4.  9.12.20  Item 6 &
Item 11 
Addictions services  M Dendy 1. An update on accommodation issues
affecting the delivery of the addiction
services was requested.   
21.9.21 – verbal update given – work ongoing to
resolve accommodation issues. 
2. Update requested on funding commitments. 
ADP strategy presented and approved at IJB on
21.9.21. Request for detail on commissioning of
services, evidence of benefits and achievements and
timelines for implementation of funding
commitments to be brought back to IJB. 
16.2.22 PF&A – update noted at meeting with
commitment to report back on specifics and
performance objectives 
June 2021 – deferred to
September 2021 –
deferred to PFA
November 2021 –
deferred to February
2022   
September 2021 
December 2021 
August 2022 
Complete 
Ongoing updates on
progress scheduled
into forward plan
for PFA 
MAT standards
update given to Feb
IJB PFA

Page 18

2 
6.  22.6.21  Item 6 Whistleblowing  R McGuffie  An agreement with NLC was to be developed to
ensure a clear process for all H&SC NL staff. 
An annual report to be provided to the IJB 
March 2022 – draft guidance shared with NLC and
awaiting comment 
December 2021 
December 2022
Ongoing –update
planned for sept 23
IJB 
Complete
11.  22.6.22 Item 8 Financial Plan -
Provision of smoke
alarms 
R McGuffie  Agreed that H&SC NL funding towards provision of
smoke alarms to meet new standards would be
included within future Digital Strategy report. 
March 2023 Update to be
provide after year-
end figures 
14. 22.6.22 Item 9  Equalities
Mainstreaming 
Report
M Dendy  Progress updates on delivery of equality outcomes
to be presented via Performance, Finance & Audit
Committee 
May 2023 On agenda
18. 31.8.22 Item 6 IJB Self-Assessment
Report   
R McGuffie Consider hosting a development session to
further explore the self-evaluation work 
Ongoing – future
Liaison session
topic
19. 16.11.22 Item 5  Risk Management
Strategy
R McGuffie  Reviewing risk management strategy which will
be brought to the committee in due
course.  Reviewing a process to have
shared risks between partnerships and
acute and also review current risk
register 
Update planned
for March 2023 IJB 
Complete 
20 16.11.22 Item 6 Analogue to digital R McGuffie Share progress report on the work  On April 2023
agenda 
Complete 
21. 14.2.23 Item 11 Performance Report R McGuffie  Bring more information on OT paediatrics and
speech and language 
On April 2023
agenda
Complete 
22. 14.2.23 Item 13 MH Strategy R McGuffie Consider dedicating liaison session for a more
in-depth discussion

Page 19

3 
Discuss wider thematic work with Brian Moore
and Cllr Ayeshah Khan 
ACTION LOG – ITEMS DEFERRED DUE TO COVID 
NO  DATE  ITEM
NO 
DESCRIPTION  ACTION BY  ACTION & PROGRESS  DUE DATE  COMPLETION
STATUS

Page 20

4

Page 21

5 
CLOSED ACTIONS 
1.   
NO  DATE  ITEM
NO 
DESCRIPTION  ACTION BY  ACTION & PROGRESS  DUE DATE  COMPLETION
STATUS
7.  21.9.21  Item 7  Primary Care
Implementation 
Plan 
Dr L Munro  2. An update on planned engagement events with
local people on the primary care
implementation plan was requested.
Update provided and noted at March 2022 IJB 
21.6.22 – verbal update on progress noted 
3. Memorandum of Understanding to be shared
December 2021  Complete – update
report to 16th Nov
PFA 
Remove 
Complete 
9. 21.9.21  Item 16  Best Value Audit  M Dendy  An update on the Self Evaluation exercise is to be
presented to the PF&A committee. 
February 2022 –
deferred to August
2022 as engagement
event took place after
PF&A meeting 
Complete 
Complete 
10.  8.12.21  Item 14 Integration review -
Chief Financial
Officer 
R McGuffie  Following approval to proceed from the IJB, reports
were to be presented to NLC and NHSL Board to seek
support for preferred option. 
16.2.22 Update on progress provided at PF&A meeting.
HR process being progressed  
21.6.22 – Update on recruitment of CFO provided 
23.3.22 – Update provided to IJB to note that HR
process has commenced and recruitment to additional
post is underway. 
March 2022 
June 2022 
Complete

Page 22

6 
12. 22.6.22  Item 5 Unaudited Accounts  R McG/NL  Content of report to be amended to include more
details around reason for significant underspend 
June 2022 Report updated
accordingly.   
Complete 
13. 22.6.22 Item 8
& Item
9
Equalities
Mainstreaming 
Report & Risk
Register 
R McG/CJ  IJB members suggested additions to the IJB risk
Register on following highlighted risks; 
 Cost of Living Pressures
 Urgent/Unscheduled care 
 Community Alarms (Analogue to digital) 
 National Care Service 
September 2022 
Complete
1. 30/10/18 Item 11 Reserves Strategy A Kilburn  To develop a reserves strategy on receipt of national
guidance on setting minimum levels of reserves.
In the interim period a local reserves strategy will be
progressed. 
Update September 2021: The IJB Reserves Strategy
2021/2022 was approved by the IJB on 22 June 2021. 
This report provided an update on the review of the
existing IJB reserves and new reserves were established
in line with planned commitments and Scottish
Government guidance. 
Update on Exit strategies to be presented to PF& A in
November 2021 
8.12.22 Update provided within report Medium to Long
Term Financial Planning. Further work being
undertaken to confirm exit plans and ongoing areas of
work. 
23.3.22 – Update on Financial plan for 2022/23
presented that included update on reserves strategy
June 2021 
November 2021 –
deferred to IJB
December 2021
deferred to March
2023. 
Complete 
Reserve strategy
presented to IJB PFA
on 16th Nov. Final
version to March IJB
alongside updated
SCP 
Added to March 23
agenda- complete

Page 23

7 
but agreed at meeting to provide further more detailed
update to include exit strategy for short term initiatives
funded from reserves and conclusion of all other areas
of reserve funding  
2.  26.5.20 Item 10  Internal Audit
Report – Due
Diligence Review 
A Kilburn  Further update on the disaggregation of the children,
families and justice social work services budget to be
presented to the IJB.
Update September 2021: The progress in respect of
this action is regularly reported to the IJB
(Performance, Finance and Audit) Committee. 
The updated report to the IJB (Performance, Finance
and Audit) Committee on 24 August 2021 advised that
the budget disaggregation exercise has been
concluded.  The revised IJB direction to NLC issued on
23 March 2021 excludes the total budget transfer in
respect of Children, Families and Justice Services.   
Work is continuing to progress in respect of the hosting
arrangements for cross-cutting and support services. 
The original timeline of March 2021 has therefore been
extended to the revised timeline of September 2021. 
The Service Level Agreement for the future hosting
arrangements and associated budgets will be
presented to the IJB following consultation and
endorsement by the NLC Adult Health and Social Care
Committee and Education and Families Committee.  A
further report will therefore be presented to the next
meeting of the IJB (Performance, Finance and Audit)
Committee on 9 November 2021.
September/December
2020
Deferred to March
2021 – deferred to
September 2021 –
deferred to
November 2021 
Update March 2022 -
Further work required
to conclude
agreements around
hosting
arrangements. 
Original Action
complete with
further update on
hosting
arrangements
presented to PF&A
in November 2021.   
Complete –
presented to IJB PFA
on 16th Nov

Page 24

8 
3.  22.9.20  Item 7  Recovery Process  M Dendy  IJB to receive an update on opportunities presented
during recovery process. 
21.9.21 – Report presented setting out proposed use of
a Change Fund. 
Progress reports on each element of the proposed plan
to be presented to the PF&A 
February 2022 – update on progress noted with further
updates to be presented 
March 2021
Deferred to
September 2021 
February 2022 
Ongoing – delegated
to PF&A to complete
action. 
Ongoing 
Complete 
5.  9.12.20  Item 7  Category One
Responders 
M Dendy  An update on this issue was to be provided at the next
meeting of the IJB following the completion of the
consultation exercise and any further feedback from S
Government. 
Update provided on 23.3.21 and a further update will
be provided following completion of the engagement
events with Chief Officers and IJB Chairs 
21.9.21 – Update provided highlighting confirmation of
named officers with lead responsibility. 
Further updates to be provided following anticipated
national workshops. 
March 2021 
September 2021 
December 2021 
Self assessment
completed and
feedback from West
of Scotland Regional
Resilience
Partnership
received. Update
report to next IJB in
March 23- Complete   
8. 22.9.20  Item 5  Mental Health
Continuing Care
Contracted Beds 
R McGuffie  Issue not progressed as planned during 2020 as
engagement process postponed due to lockdown
impact on visits to care homes. 
21.9.21 Business Case to be developed and presented
to IJB, South Lanarkshire IJB and NHSL Board. 
June 2022  Business case to be
presented at IJB
September 2022 
Delayed following
advice from HIS

Page 25

9 
22.3.22 – Update provided on progress on engagement
and development of business case 
September 2022  around engagement
standards. Final
business case to Dec
IJB. 
Approved at NL IJB,
SL IJB and NHS
Board in December
2023. Complete. 
15. 22.6.22 Item 12 Strategic
Commissioning Plan 
M Dendy/T
Marshall  
Detailed report on community nursing to be brought
back to future meeting and included within SCP 
On March 23 IJb
agenda –IJB
approved plan
16.  22.6.22  Item 4 Community Alarms R McG Provide the committee with an update on community
alarms switching from analogue to  digital and risk to
service users 
Complete
Update provided at
16th Nov PFA
17. 22.6.22 Item 14 Audited Accounts  R McG Bring audited accounts to Sept committee  
Complete

Page 26

REPORT 
Item No: 5 
SUBJECT:  Risk Management: IJB Risk Register 
TO:  IJB Performance, Finance and Audit Committee
Lead
Officer for
Report: 
Ross McGuffie, Chief Officer NHSCP 
Author(s)
of Report 
Stacey Anderson, Support Services / Project Manager
DATE:  21st June 2023 
1. PURPOSE OF REPORT
This paper is coming to the  IJB Performance, Finance and Audit Sub-
Committee: 
For approval  For endorsement  To note 
The purpose of this report is to provide a summary to the Integration Joint
Board on risk management activity, noting any amendments or additions to
the current risk register. 
2. ROUTE TO THE IJB Performance, Finance and Audit Committee 
This paper has been: 
Prepared   Reviewed   Endorsed 
By: The Operational & Business Manager and Chief Officer for H& SC NL. 
3. RECOMMENDATIONS 
3.1 The IJB PFA is asked to note the contents of the report which includes the
latest version of the IJB risk register and a note of those operational risks
highlighted by the Heath & Social Care North Lanarkshire partnership that
impact upon delivery of IJB business. 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES 
5.1  From a good practice and sound governance perspective, all public bodies
are required to identify and take account of the impact of any potential risks in
delivering their business. 
Yes  No  N/A 
1

Page 27

BACKGROUND/SUMMARY OF KEY ISSUES (CONT.) 
5.2  The PFA Committee has delegated oversight and responsibility for financial
and performance risks associated with the remit of the Integration Joint Board
and the PFA committee considered the finance and performance risks at its
last minute on 19th April 2023. The register was also reviewed at the IJB on
17th May 2023. 
5.3 A full review of the risk management reporting within the IJB is currently in
progress as part of the risk strategy review and in line with the dynamic
developments and changes the new NHS Lanarkshire Risk Manager is
implementing within the board. These developments will include review of how
risk reporting is managed and presented at IJB and a further evaluation of the
improvement methodology aligned with the risk actions. In order to provide a
robust overview of these developments, a risk management session has been
scheduled for the next IJB Liaison Session and a full report of changes/
developments will be provided to the IJB PFA and IJB at the next meeting.   
5.4 Following discussions at the last meeting of PFA on 19th April 2023, the risk
register has been updated and additional controls/actions added to:
 IJB 01/21 – Financial Challenges
 IJB 04/21 – Set Aside
 IJB 06/21 – Prescribing
 IJB 11/21 – Performance
 IJB 13/21 – Care Homes
 IJB 14/22 – CAMHS
 IJB 17/22 – Unscheduled Care  
5.5  There are currently two risks rated as Very High on the IJB risk register.
 IJB 06/21 – Prescribing Activity and Costs 
 IJB 17/22 – Unscheduled Care 
5.6  There are eight high rated risks on the IJB risk register.
 IJB 01/21 - Financial Challenges 
 IJB 04/21 - Notional Set Aside Budget 
 IJB 12/21 - Staff Health & wellbeing 
 IJB 14/22 – CAMHS
 IJB 15/22 – Cost of Living
 IJB 16/22 – National Care Service
 IJB 19/23 – Service sustainability
 IJB 20/23 – Workforce sustainability 
5.7 There are a number of high/very high rated operational risks that have been
identified as having or potentially having an impact on IJB objectives and/or
delivery of services and these are highlighted below. 
No Risk  Risk
Rating 
Lead
Organisation/Area
1882 Acute Sector Bed Capacity -
availability of acute beds due to
delays experienced for onwards
Very
High 
NHSL Corporate 
2

Page 28

movement of patients 'fit for
transfer' to care homes, those
requiring care at home,
exacerbated by rising cases of
Covid and high demand
2085  Capacity within NHSL to respond
to ongoing challenges due to
Covid 19 and associated variants
Very
High 
NHSL Corporate 
1379 Delayed Discharge Performance
and Impact
High  NHSL Corporate 
1984 Impact From Stepping Down
Non-Urgent Services
High  NHSL Corporate 
1832  Compliance with the Health &
Care (Staffing) (Scotland) Bill:
Clinical Workforce due to issues
of availability, recruitment and
retention. 
High  NHSL Corporate 
1710  Public Protection: There is a risk
that NHSL could fail to identify
harm to any vulnerable person,
child or adult, or prevent harm to
others resulting from the
complexities of opportunity lost
due to the current reprioritising of
services in response to COVID-
19. 
High  NHSL Corporate 
659 Failure to deal effectively with
major emergency
Very
High 
NHSL Corporate 
2039  Staff Fatigue, Resilience,
Wellbeing & Safety – Effects of
prolonged Covid response is
adversely impacting  on staff,
increasing  staff absence and
consequently reducing 
workforce capacity.
Very
High 
NHSL Corporate 
1992  Continuous Covid Response &
impact on routine PH Screening
& surveillance programmes 
High NHSL Corporate 
1587  Sustainability of the two-site
model for the Out-of-Hours
Service
Very
High 
NHSL Corporate 
2004  Potential Impact on patients
resulting from disruption of day to
day clinical care in response to
Covid pandemic 
Very
High 
NHSL Corporate 
1989   Ability to maintain a workforce
commensurate with the need to
suppress Covid, deliver
Vaccination  Programme,
Recover & Remobilise 
Very
High 
NHSL Corporate 
2014  Recovery of Performance
2021/22
Very
High 
NHSL Corporate 
3

Page 29

2086  Sustaining GP Services  Very
High 
NHSL Corporate 
NLC
RIA0000446
Unable to deliver services due to
funding issues 
Very
High 
NLC  - Social
Care/Social Work 
NLC
RIA0000448 
Availability of workforce to deliver
services within legislative and
regulatory compliance
requirements.
High  NLC – Social
Care/Social Work 
NLC
RIA0000449
Information & Data Protection –
non-compliance with information
governance legislation,
standards and processes and
data security and inability to
retrieve relevant data with
deadlines 
High  NLC – Social
Care/Social Work 
NLC
RIA0000450
Health & Safety of staff in SW &
partnership companies – failure
to ensure the health safety and
welfare at work of the service,
employees, partners and 
provider agencies 
High  NLC – Social
Care/Social Work
NLC
RIA0000453
Supplier failure or services not
provided to required standard.
Insufficient number of providers. 
High  NLC – Social
Care/Social Work
NLC
RIA0000457
Inadequate supervision,
governance and monitoring
across professional workforce 
High  NLC – Social
Work/Social care
NLC
RIA0000458 
IT system not fit for purpose  High  NLC – Social
Work/Social care
NLC
RIA0000459
Integration – there is a risk that
services and not integrated
effectively thus impacting on
improving the outcomes for
individuals receiving care and
support 
High  NLC – Social
Work/Social care
NLC
RIA0000460
Performance & planning –
increasing expectations and
changing performance demands
will result in a failure to provide
performance information internal,
external and including S Govt, 
High  NLC – Social
Work/Social care
NLC
RIS0000414
Community alarm and assistive
technology – unable to continue
to support people with a
community alarm system and
develop use of assistive
technology 
Very
High 
NLC – Social
Work/Social care
NLC
RIS0000415
Mental Health Officers – Failure
to comply with legal obligations 
High  NLC – Social
Work/Social care
NLC
RIS0000417 
Communications strategies and
engagement plans – Inadequate
strategies not aligned with
strategic objectives  
High  NLC – Social
Work/Social care
4

Page 30

NLC RIS000419 Non- compliance with
Information Governance & Data
Protection 
High  NLC – Social
Work/Social care
NLC RIS000426 Analogue to digital transition &
ability to provide a working
community alarm service 
High NLC – Social
Work/Social care 
6. CONCLUSIONS 
6.1 The IJB currently has 17 risks identified on its IJB risk register with 10 risks
rated as high or very high. 
6.2 Risks identified by H&SC NL as potentially impacting on IJB business are
highlighted in the report. 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES  
N/A 
7.2 ASSOCIATED MEASURE(S) 
N/A 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes   No  N/A 
Financial risks are identified in the risk register. 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
This report sets out the IJB risk register and risk assurance process for the
IJB 
7.5  PEOPLE 
N/A 
7.6  STAKEHOLDER ENGAGEMENT 
Stakeholders are represented at the IJB and the IJB PFA Committee and can
contribute to approval and amendments to the IJB risk register. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed: 
Yes  No  N/A 
8. BACKGROUND PAPER 
None 
5

Page 31

9. APPENDICES 
IJB Risk Register   Appendix 1  
IJB Risk Register Overview  Appendix 2 
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact
Stacey Anderson on telephone number 07976801913.
6

Page 32

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB02.
21
Financial
Reputational
01/04/2021
Ineffective Governance Arrangements
There is a risk that the IJB is unable to prevent and detect fraud and corruption within services because of 
inadequate governance arrangements and inadequate internal control systems which could lead to financial and 
reputational damage.
LOW CONTROLS
1. Fraud awareness e‐learning.
2. National Fraud initiative.
3. Locality/SW Enablement Groups.
4. Segregation of duties in relation to authorising and processing direct payments.
5  Whistle blowing policies.
6. Procurement processes and standing orders.
7. Oversight via NLC Audit and Scrutiny Panel and NHSL Audit Committee.
8.  Effective governance arrangements are in place and subject to internal and external audit review.
9.  IJB and IJB PFA meetings established ensuring effective oversight of financial performance.
10. The IJB does not maintain its own policies relating to the prevention and 
detection of fraud and error but instead depends on those in place at its partner 
bodies. . The IJB has a Code of Conduct in place to which members subscribe and the Members’ 
Registers of Interests are publicly available on the IJB’s website.
ACTIONS
1. Continue to raise fraud awareness through team briefings.
2.   Annual planned Procurement and Standing Financial Instructions presentations.                                                                                      
3. Annual review of Code of Conduct                                                                                                                                                                          
4. Review of how Members' Decleration of Interests are collated and reviewed.
5. IJB to request Fraud prevention and detection reports from both partners for oversight at the IJB PFA.                                                 
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.03.24
Previously IJB6.
Reviewed and 
updated on  
March 2023. 
IJB.01/
21
Financial
Strategic
01/04/2021
Financial Challenges
There are a range of financial challenges which will impact on the IJB's ability to deliver the Strategic 
Commissioning Plan intentions within the financial envelope available.  These include:
1.  The absence of a unique IJB financial settlement from the Scottish Government.
2.  The IJB is dependent on funding from both partners.
3.  Late Scottish Government financial settlement.
4.  Budget reductions due to insufficient Scottish Government financial settlements and/or partner contributions.
5.  New Scottish Government policy commitments e.g. Carers (Scotland) Act 2016.
6.  Demographic growth.
7.  Competing service priorities.
8.  Conflicting partner efficiency savings programmes which adversely impact on the HSCP's ability to deliver 
services.
9.  In‐year cost pressures emerging due to the underachievement of planned savings, pandemics and other 
emerging risks which may lead to an overspend.
10.  Each partner may be unable to maintain their financial contributions to the IJB in future years which would 
impact on frontline health and social care services. 
11. The agreed transformational plans and service redesigns are not implemented in full and in line with the 
original implementation plan and/or do not secure the intended improvement outcomes in both performance 
standards and financial efficiency targets.
12.  Future savings targets will continue to be challenging and are likely to impact on essential core services.
13.  The IJB Financial Plan cannot be adhered to and budget recovery plans fail to achieve financial balance for 
both partners.
14. The impact of the pandemic on the financial sustainability of external providers in particular social care 
providers.
15.  The financial implications of the impact of the pandemic on the workforce e.g. increase in sickness absence, 
early retirement requests and recruitment challenges.
The above factors would lead to a failure to achieve the desired strategic aims and would also impact on service 
delivery.
CONTROLS
1.     IJB PFA Committee.
2.     IJB Chief Officer is a member of each partner's key decision‐making forums.
3.     Effective joint working between Chief Financial Officer and both Council and NHS Finance Departments.
4.     Regular budget meetings with Chief Executives and Directors of Finance.
5.     Regular HSCP budget monitoring meetings across Senior Leadership Team.
6.     The IJB Financial Plan 2023/2024 has been agreed and is being reviewed regularly.
7.     IJB medium term financial plan 2023‐25 and reserves strategy 2023‐24 approved at March 23 IJB
8.     Capacity plans in place  to maximise efficiency.
9.     IJB Integration Scheme setting out the budget recovery processes.
10.   IJB Financial Regulations and financial procedures.
11.   Consultation and involvement with key stakeholders including service users and carers.
12.   Prescribing Quality and Efficiency Programme, SWEG, ARG and Home Support monitoring groups are in place.
13.   Joint Strategic Needs Assessment and ongoing move towards preventative and anticipatory approaches.
13.   Strategic Planning Group, Locality engagement sessions and Partnership Boards.
14.   Effective and ongoing service user engagement, staff consultation and Trade Union liaison at strategic and local levels.
15.   Financial sustainability payment arrangements in place to 31 March 2023 to support external social care providers.
16.  The Scottish Government announced on 5 October 2021 an additional £300m for winter health and social care pressures.  
18.  Work is ongoing with both partner organisations to confirm the final 2023/24 budget. Once complete, a new risk will be created to reflect the 
final 2023/24 financial plan. 
ACTIONS
1.    Annual budget setting processes within each of the partners.
2.    HSCP participating in NHSL Sustainability and Value process
3.    Partnership will also be connected to new national whole system groups around budget
Previously IJB2, 
IJB7, IJB10 and 
IJB12.
Reviewed and 
Updated May 
2023. 
HIGH
M
EDIUM
M
arie M
oy
M
arie M
oy
SLT, IJB PFA, IJB
31.05.23
HIGH
Report Prepared by Stacey Anderson on behalf of the Chief Officer
7

Page 33

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB04.
21
Financial
Strategic
01/04/2021
Notional Set‐Aside Budget
There is a risk that resources will not be transferred from Acute Services to the HSCP in line with the shift in the 
balance of care from residential and acute settings to community based alternatives as expected in terms of the 
notional set‐aside concept.  This includes the ongoing development of locality pathways to support maintaining 
people at home e.g. transitional care models.
VERY HIGH
CONTROLS 
1.There is complete transparency and ongoing dialogue between the IJB and the Health Board on the challenges associated with the 
implementation of the notional set‐aside concept.
2.  Bed modelling and capacity planning arrangements are in place. 
3. Effective working relationships between both partners and the IJB have been established. 
4.  Since the inception of the IJB, an agreement is in place whereby the NHSL Health Board will manage the overspend or underspend across the 
notional set‐aside budget.  This arrangement continues to be in place for 2022/23
ACTIONS 
1.The Chief Officer and the Chief Financial Officer continue to raise this concern at a national level.
2. Discussions ongoing with NHSL Director of Finance around unscheduled care spend in 2023/24 and potential carry forward from 22/23 budget
HIGH
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.05.23
Reviewed and 
Updated May 
2023. 
IJB05.
21
Financial
Strategic
01/04/2021
Hosted Services
There is a risk of dispute between the North Lanarkshire IJB and the South Lanarkshire IJB in respect of the 
financial allocations underpinning the Hosted Services particularly as a result of the budget changes linked to the 
implementation of devolved locality models.  This could impact on the ability of each IJB to achieve its 
commissioning intentions and may also have an adverse impact on service users across Lanarkshire.
VERY HIGH
CONTROLS 
 
1. North and South IJBs aim to co‐operate to ensure a pan‐Lanarkshire approach is achieved across all hosted services.
2.  Financial and budgetary controls.
3.  Performance reports on service delivery.
4.  The Hosted Services principles in respect of the management of the overspends and underspends are agreed for each financial year.
M
EDIUM
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.06.23
IJB06.
21
Financial 
Operational
01/04/2021
Prescribing Activity and Costs
The cost of prescribing is growing due to issues in supply chains driving increased wholesaler cost of medicines, 
advance treatment developments resulting in the need for more expensive medications, aging population and 
increase in patients requiring regular medication. Medication availability has been impacted following the EU 
withdrawal the UK 's membership of the common regulatory bodies and EU agencies, such as the European 
Medicines Agency, (EMA), European Centre for Disease Prevention and Control and the European Atomic Energy 
Community. The risk is that this could impact on the availability of medicines, healthcare techniques and 
technology and in respect of the supply of medicines and medical devices, additional checks are now required at 
ports in the UK and the EEA before goods, including medical products, can cross the border.  New customs checks 
are required when moving medicines between the EEA and the UK.
M
edium 
CONTROLS
1.. Prescribing Quality and Efficiency Programme.
2.  Prescribing Management Board functions and membership.
3. Deputy Lead Pharmacist supporting HSCP Senior Leadership Team.
4. Locality Pharmacist input.
5. Earmarked reserve established to address prescribing costs.
6. Regular HSCP monitoring. 
In respect of the regulation of medicines and medical devices, the Medicines and Healthcare products Regulatory Agency (MHRA) became the 
UK’s sovereign regulator.
7. The new trade deal contains specific clauses that mean both the UK and EEA states formally recognise each other’s good practice in medicine 
manufacturing.
8. To reduce the risk of divergence from the EU rules, there are three interrelated factors; the technical annexes of the new trade deal, the 
Northern Ireland protocol and the UK Internal Market Act.
9. The effectiveness of the Border Operating Model to import and export goods to and from the EEA, which was being implemented in  stages 
from 2020 to minimise any risk of disruption, is still being assessed.  The risk of border delays is still evident.  Other measures were also 
implemented specifically to mitigate the risk of supplies of medicines and medical devices being disrupted.  In August 2020 the UK government 
instructed medicine suppliers to maintain a stockpile equivalent to six weeks’ supply though the first three months of 2021.  In addition, the 
Department of Transport has secured additional freight capacity to bring medicines into the country via other routes.
ACTIONS
1. Review of Locality Prescribing Action Groups.
2. Prescribing part of NHSL Sustainability and Value structures
3. Continuation of Scriptswitch.
VERY HIGH
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.06.23
Previously IJB11.
IJB07.
21
Financial
Strategic
01/04/2021
Third and Voluntary Sector
There is a risk that Third Sector organisations in North Lanarkshire are vulnerable because of the lack of certainty 
in respect of long‐term funding security.  This uncertainty has the potential to lead to service instability, 
recruitment and retention challenges and an increasing reliance on statutory services. 
HIGH CONTROLS
1.  Third Sector Interface represented on key strategic groups.
2.  Community capacity building and carer support infrastructure embedded across North Lanarkshire.
3.  Community capacity building is regularly reviewed.
4.  Maximising funding opportunities for the third and voluntary sector will continue to be progressed.
ACTIONS
 
 
1.The annual HSCP funding which is directed to the third sector is recurring funding.  Funding will be confirmed each year in line with the 
agreement of the IJB Financial Plan and subject to the Scottish Government financial settlements for future years.
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.23
Previously IJB16.
Report Prepared by Stacey Anderson on behalf of the Chief Officer
8

Page 34

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.10.
21
Financial
Strategic
01/04/2021
Ineffective Governance Arrangements Due To the Covid‐19 Pandemic
1.   There is a risk that the intensity of the required response to Covid‐19 could result in a failure of governance 
impacting on the effectiveness of the IJB decision‐making, IJB directions to partners and IJB oversight of 
operational service delivery.  Routine governance processes could be overwhelmed. 
2.   New or amended Covid‐19 legislation and Scottish and UK Government guidance may not be adopted 
effectively and timeously.
3.   There is no / limited public access to IJB and PFA meetings during the period of the pandemic, in line with 
Public Health advice.
4.   Ineffective information governance controls could lead to data breaches and an impact on the General Data 
Protection Regulations.
5.   Communications with employees, patients and service users may be ineffective.
6.   There will require to be changes to the working environment including remote working and working from 
home.
7.  There is a reduced ability to protect the wellbeing of employees, patients and service users.
8.   There may be adverse media coverage locally, a loss of public confidence and reputational damage.
M
EDIUM
CONTROLS
1. National Networks are established which are providing the framework to support a national approach where appropriate.
2.  Public Health advice and support is in place. 
3.  Increased numbers of agile workers and increased number of laptops/tablets.
4.  Continued working from home arrangements supported by the roll out of MS Teams / Zooms.  Regular updates on the guidance for the use of 
MS Teams / Zoom Meetings is circulated.  A blended approach to home/work‐based working is being developed going forward.
5.  Risk registers are in place for the IJB and each partner.  Each partner has a specific HSCP Covid‐19 Risk Register in place.
6.  The IJB and both partners aim to comply with the European Working Time Directive (WTD) and minimise the risk of all staff working beyond 48 
hours per week, in particular front‐line service delivery.  As a result of the withdrawal from the European Union, the WTD ceased to apply to the 
United Kingdom at the end of the transition period (31 December 2020).  However, the UK's Working Time Regulations which implement the EU 
Working Time Directive will continue to apply unless and until amended by UK law.
ACTIONS 
1.  Staff health and well being is a key priority for both partners and all key stakeholders.  The commitment to staff health and well being is being 
actively promoted through all available forums.
M
EDIUM
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.06.23
IJB.11
21 
Performance  30/07/2021
Oversight of Performance Activity                                                                                                                                               
There is a risk that the  IJB is not provided with adequate or sufficient performance information to enable it to 
discharge its scrutiny and oversight role; make informed decisions and recommend remedial actions to address 
any performance concerns. 
LOW CONTROLS
1. Regular (quarterly) reports on the IJB performance framework, providing updates on areas for improvement, remedial actions (and timescales) 
and updates on performance issues previously reported.
2. Chief Executive Performance Review arrangements.
3. Hosted Services Performance Review arrangements.
4. Sector/Locality Performance Review arrangements.
ACTIONS
1. Request detailed topic based performance reports on specific areas of concern  e.g. CAMHS & Psychological Therapies.
2. Face to face Q3 performance reviews taking place throughout May 23 with sectors/units
low  LOW
Ross M
cGuffie
M
orag Dendy 
SLT, IJB PFA, IJB
31.12.23
IJB.12.
21 
Performance  30/08/2021
Staff Health & Wellbeing
There is a risk to the delivery of the Strategic Commissioning Plan as a result of sustained pressures on staff 
availability due to additional pressures associated with  Covid 19, current sickness abscence levels and potential 
for further staff redeployment due to winter planning contingency arrangements.                                                   
medium 
Controls
1. Strategic Staff Health & Wellbeing Committee  established reporting to NLC & NHSL corporate management teams.
2. Range of support services available both nationally and locally e.g Occupational Health, Spiritual care, Psychological Services, national 
wellbeing hub (www.PRoMIS.scot.uk).                                                                                                                                                                                                  
3. Rest & Recuperation areas identified.                                                                                                                                                                                               
4. Peer Support Networks established                                                                                                                                                                                                   
5. Well established Occupational Health supports available to support staff sickness.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Actions
1. Short Life Working Group for wellbeing with targeted approach for immediate actions including Staff Health & Wellbeing Champions, access to 
online supports, access to Occupational Health Services, helpline established and dedicated resource identified for wellbeing officers to be 
recruited.
2. Funding recieved by Scottish Government specificaly targeting staff well being programmes and supports. Local plans for use of funding being 
developed.                                                                                                                                                                                                                                                   
3. Managers supporting & encouraging staff to take planned leave/use full leave allocation
4. Audits of adherence to sickness absence policy being undertaken
HIGH 
low  Ross M
cGuffie
Ross M
cGuffie 
SLT, IJB PFA, IJB, SC&CG, AH&SC 
31.05.23
Reviewed and 
Updated May 
2023 
IJB.13.
2021 
Performance  30.08.21 
Care Homes                                                                                                                                                                       
Inability of care homes to sustain service due to staffing or Covid outbreaks resulting in closure to new 
placements. This may increase delayed discharge numbers putting additional pressure on acute site capacity and 
impacting on recovery.
The financial support for social care providers during the Covid‐19 pandemic is being reviewed.  Payments in 
respect of under‐occupancy in care homes were extended to 31 October 2021.                                                                
High  Controls                                                                                                                                                                                                                                                       
1. Establishment of Care Home Assurance Team.
2. Escalation Process in place.
3. National protocol to support discharge of Covid 19 patients in place.
Actions 
1.  Public Health teams providing guidance on infection control.
2. Care Home assurance team undertaking support visits to all care homes & action plans in place for each care home.
3. Staff and visitor testing in place.
4. All care homes advised to use PPE in line with national  addendum.
5. Development day on 12th May 23 to agree structures and approach for year ahead
medium
medium 
Ross M
cGuffie
Trudi M
arshall 
IJB, PF&A, SLT, SC&SC, A H &SC 
31.12.23
Report Prepared by Stacey Anderson on behalf of the Chief Officer
9

Page 35

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.14.
2022
Strategic & 
Performance 
30.04.22
CAMHS ‐                                                                                                                                   There is a risk that the CAMHS 
service cannot meet the increasing clinical demands due to a significantly high number of cumulative staff 
vacancies for both clinical and non‐clinical posts and challenges recruiting to new posts identified through the 
national recovery and renewal fund.  This is impacting on community, in‐ patient and out‐ patient care with the 
potential to adversely affect response time to referrals; longer waiting times; poorer outcomes; delays in redesign
and reputation of the IJB. 
Very High 
Controls ‐                                                                                                                                                                                                         
1. Prioritisation of referrals; all referrals 1vetted daily with urgent referrals prioritised 
2. Commenced programme of work and implementation of a more structured partnership approach through Choices & Partnership Approach 
(CAPA) service model, with tier 1 & 2 referred through 3rd sector and interfacing with North & South Education Departments
3. Secured significant national investment to fully implement new service model
4. Active review of skill mix to utilise medical staff only when required for highly complex patients
5. Vacancy gap analysis with active recruitment commenced.  Expected to have recruited 75% of gap by end of May 2023
6. Continuous review and validation of the waiting list
Action
1. Incremental implementation of the new service model
2. CAPA appointments begin on 1st May 2023
3. Refurbishment of North Lanarkshire facilities commences early summer 2023
High
medium 
Ross M
cGuffie
M
orag Dendy 
IJB,PF&A, SLT 
31.05.23
Reviewed and 
Updated May 
2023. 
IJB.15.
2022
Strategic & 
Performance 
05.09.22
Cost of Living
There is a risk that the IJB's Strategic Commissioning Plan will be unable to be delivered or not have the desired 
impact due to the cost of living rises being faced by residents across North Lanarkshire, leading to a further 
widening of the inequality gap, reduced quality of life and increased health and social care demand due to 
individuals and families having insufficient funds to support basic requirements such as food and heating. 
High CONTROLS
1. NLC Silver command group stood up focused on cost of living
2. NHSL commenced review through CMT
3. Population Health Committee to review activity around cost of living
ACTIONS
1. Survey of NLC hybrid workers to see if home working remains financially viable
2. Business case being developed to expand 'support for people' arrangements used in pandemic to support resident access to welfare rights and 
other supports
3. 3% increase in individual budgets to support service users to maintain current levels of supports at higher cost
4. Recommendation from adult social work, care and wellbeing committee to review all charges to service users and wider cost of living supports 
that could be offered
5. SW Committee approval sought for cost of living contract increases in May 2023
High
M
edium
Ross M
cGuffie
Ross M
cGuffie
SLT, IJB
31.05.23
Reviewed and 
Updated May 
2023. 
IJB.16.
2022
Strategic   05.09.22
National Care Service
There is a risk that the ongoing work around a National Care Service could destabilise current service delivery due 
to significant change activity, time demands around the co‐design process, staff uncertainty and partner 
organisations having to focus inwardly due to the impact of change leading to an impact on the ability to deliver 
the significant ongoing change programmes already approved by the IJB and the Strategic Commissioning Plan for 
2023‐26. 
High CONTROLS 
1. NLC establishing NCS working groups
2. Key HSCP leads involved in national developments
3. Ongoing progress updates to IJB and IJB PFA
ACTIONS
1. IJB response submitted on proposed Bill
2. Strong partnership links into working groups at Chief Officers, Chief Finance Officers and Social Work Scotland groups
High
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
31.05.23
Reviewed and 
Updated May 
2023. 
IJB.17.
2022
Strategic & 
Performance 
05.09.22
Unscheduled Care
There is a risk that we cannot sustain whole system patient flow through peak winter pressures due to increased 
front door demand; hospital workforce capacity; delays in onward movement of patients due to care home 
capacity/outbreaks and care at home capacity; and community health and social care workforce capacity leading 
to reduced ability to meet 'routine'  and increasing bed demand for more unwell patients, deteriorating delayed 
discharge performance and an inability to recover services. 
Very High
CONTROLS
1. Care Home Assurance Group and associated supports for care homes through liaison service, IPC advice and support, risk assessment for 
onward movement of patients etc
2. Care at Home Assurance group and associated activity to try to support and sustain independent sector provision
3. NHS CMT and Covid response group oversight of performance
4. Daily PDD meetings to review every planned supported discharge and delayed discharge
5. Operation Flow now underway to ensure whole system approach to unscheduled care/delayed discharge challenges
ACTIONS
1. Expansion of Home Support service
2. Roll out of Home Assessment Teams across all 6 Localities by Feb
3. New CSW roles in District Nursing teams to proactively support Care Managed patients
4. Additional Nursing capacity in District Nursing Teams
5. Expansion of Equpiment and Adaptation Service to support rapid access in community
6. Expansion of H@H service (hours of provision as well as moving to support discharges as well as admission prevention)
7. Expansion of Integrated Rehabilitation Teams in all six Localities to support rehab in the community and reduce long‐term service demand
8. 5 Task and Finish groups now established to roll out the key actions agreed through the Operation Flow programme (Phase 2 to be completed 
by Sept 23)
Very High
M
edium
Ross M
cGuffie
Ross M
cGuffie
SLT, IJB PFA, IJB 
28.06.23
Report Prepared by Stacey Anderson on behalf of the Chief Officer
10

Page 36

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.18.
2022
Strategic and 
Performance 
05.09.22
Community Alarms
There is a risk that the community alarm system will be destabilised due to the national change from analogue to 
digital telephony by 2025, leading to community alarm users not getting a response when required. 
High CONTROLS
1. Working group established to coordinate all activity
2. Oversight through Home Support Programme Board
3. Reporting to Adult Social Work, Care and Wellbeing Committee
4. Reporting to IJB
ACTIONS
1. NLC Committee approval to purchase 1000 digital alarms so the service can support any imminent changes over to digital in individual areas
2. NLC part of SG once for Scotland procurement process for a new digital alarm receiving centre
3. Communication out to all community alarm service users
4. Instructions issued to all community alarm service users on how to do test calls to ensure alarms are  operational
5. Engagement with telecommunication suppliers to ensure sight of roll out plans across NL
M
edium
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
30.06.23
IJB.19.
2023
Performance 
27/02/2023
Service Sustanability                                                                                                                                                                     
Due to competing service priorties and workforce/ operational and finacial challenges there is a risk that the IJB 
will be unable to implement the strategic plan/commision plan . Failure to achieve the desired strategic aims of 
the IJB poses a risk on operational service delivery and the achievement of financial balance and patient safety 
High
Controls                                                                                                                                                                                                                         
1.     IJB PFA Committee.
2.     IJB Chief Officer is a member of each partner's key decision‐making forums.
3.     Effective joint working between Chief Financial Officer and both Council and NHS Finance Departments.
4.     Regular budget meetings with Chief Executives and Directors of Finance.
5.     Regular HSCP budget monitoring meetings across Senior Leadership Team.
6.     The IJB Financial Plan is regulary reviewed and agreed. 
7.     Capacity plans in place  to maximise efficiency.
8.   Consultation and involvement with key stakeholders including service users and carers.                                                                      
9. Joint Strategic Needs Assessment and ongoing move towards preventative and anticipatory approaches.
10.   Strategic Planning Group, Locality engagement sessions and Partnership Boards.
11.   Effective and ongoing service user engagement, staff consultation and Trade Union liaison at strategic and local levels.
Actions 
1.  Sustainability  plans to be reviewed regulalry 
2. Re‐introduction of scruity panels 
3. Improve linkage across all risk registers (tiers 1 to 3, council and NHS) to help ensure areas of concern are identified and 
reviewed regularly. 
4 Review of reporting process into IJB to ensure contionus review of services/ service developments
High
Low
Ross McGuffie
Ross McGuffie
SLT, IJB PFA, IJB
31.05.23
Reviewed and 
Updated May 
2023 
IJB.20.
2023
Workforce Sustanability                                                                                                                                                                 
It is becoming increasingly difficult to recruit to particular roles across Health and Social Care.   Gaps in the 
workforce can result in reduction of service provsion, increase in staff workload and inability to deliver the 
strategic plan. Following EU withdrawl there is  no longer the free movement of labour between the UK and EEA 
countries.  All workers arriving from the EEA and non‐EEA countries are subject to the same immigration rules.  
The new points‐based immigration system makes exceptions for the majority of health care professionals with an 
NHS job offer and for qualified social workers via a new fast‐track visa route, known as the Health and Care 
Worker Visa. There are however no exceptions made for other social care roles, such as care workers.                       
The Mutual Recognition of Professional Qualifications Directive is an EU‐wide directive that allows professional 
regulators in all member states to automatically recognise professional qualifications.  The UK government has 
decided to continue recognising qualifications gained in the EEA for at least two years after the transition period 
ends.  This however is not a reciprocal and there is no guarantee that qualifications gained in the UK will be 
accepted by professional regulators in EEA nations.
High CONTROLS 
1. All successful Health and Care Worker Visa applicants are exempt from the Immigration Health Surcharge, a one‐off charge levied against 
arriving migrant workers as part of the visa application process.  The system has been designed to make international recruitment into health and 
social care roles more straightforward for employers and employees alike.  These changes to immigration rules are in law as part of the 
Immigration and Social Security Co‐ordination (EU Withdrawal) Act 2020.  As such, from 1 January 2021, they apply to all workers arriving to work 
in the NHS or adult social care.  All workers from EEA nations who are already resident in the UK had until 30 June 2021 to apply for the EU 
Settlement Scheme which will guarantee their right to work in the UK indefinitely.
2. In respect of the mutual recognition of professional qualifications, professional regulatory bodies are working with the UK government to 
review future registration requirements for those with qualifications gained in the EEA and decide what they will be from January 2023.
3. Development of the Care Academy 
4. Dedicated HR support identified in NHSL and NLC to support key priority areas of recruitment such as Mental Health and Home Support
ACTIONS
1. Annual workforce plan being prepared
2. NHSL programme underway to support international recruitment
3. On the day recruitment events being trialled in Home Support
4. Use of university status being explored following positive gains in Podiatry and Psychological Therapies recruitment
High
Medium
Ross McGuffie
Ross McGuffie
SLT, IJB PFA, IJB
31.05.23
Reviewed and 
Updated May 
2023 
Report Prepared by Stacey Anderson on behalf of the Chief Officer
11

Page 37

NORTH LANARKSHIRE IJB RISK REGISTER 
OVERVIEW 
May/June 2023 
Appendix 2
12

Page 38

North Lanarkshire IJB Risks – Dashboard 
Executive Summary 
 Following an agreement of the IJB Risk Strategy at the IJB held in May 2023, a full review of the IJB risk register was undertaken
 Any emerging or new risks are discussed at the IJB PFA and presented for information at IJB
 All risks on the IJB Risk Register are consistently reported to relevant assurance committees to provide oversight and assurance
Highest Scoring Risks  
IJB  Risk   Score   Trend  
IJB 06/21 – Prescribing Activity and 
Costs 
Very High 
Started as Medium Risk (April 2021) 
IJB 17/22 – Unscheduled Care  Very High 
IJB 01/21 ‐ Financial Challenges   High 
IJB 04/21 ‐ Notional Set Aside Budget  High 
Started as Very High Risk (April 2021) 
IJB 12/21 ‐ Staff Health & wellbeing   High 
 
IJB Risk movement since last report 
No Change  Risk Level  
Increase 
Risk Level 
Decrease 
New Risks  Closed Risks   Risks with 
Action 
Updates 
10  0  0  0  0  7 
Risk Registers  Number of 
Risks  
IJB  17 
NL Council  
NHS 
Lanarkshire 
18 
13

Page 39

Started as Medium Risk (Aug 2021) 
IJB 14/22 – CAMHS  High 
Started as Very High Risk (April 2022) 
IJB 15/22 – Cost of Living  High 
IJB 20/23 – Workforce sustainability   High 
IJB 19/23‐ Service Sustainability   High 
IJB 16/22‐ National Care Service   High 
NL Council   Risk   Score   Trend  
NLC RIA0000446‐ Unable to deliver 
services due to funding issues 
Very High 
NLC RIA0000448 ‐Availability of 
workforce to deliver services within 
legislative and regulatory compliance 
requirements. 
High 
NLC RIA0000449‐ Information & Data 
Protection – non‐compliance with 
information governance legislation, 
standards and processes and data 
security and inability to retrieve 
relevant data with deadlines 
High 
NLC RIA0000450‐ Health & Safety of 
staff in SW & partnership companies 
– failure to ensure the health safety
and welfare at work of the service, 
High 
14

Page 40

employees, partners and  provider 
agencies 
NLC RIA0000453‐ Supplier failure or 
services not provided to required 
standard. Insufficient number of 
providers. 
High   
NLC RIA0000457‐ Inadequate 
supervision, governance and 
monitoring across professional 
workforce 
High   
 
 
 
NLC RIA0000458 ‐ IT system not fit 
for purpose 
High   
NLC RIA0000459‐ Integration – there 
is a risk that services and not 
integrated effectively thus impacting 
on improving the outcomes for 
individuals receiving care and 
support 
High   
NLC RIA0000460‐ Performance & 
planning – increasing expectations 
and changing performance demands 
will result in a failure to provide 
performance information internal, 
external and including S Govt, 
High   
NLC RIS0000414‐ Community alarm 
and assistive technology – unable to 
continue to support people with a 
community alarm system and 
develop use of assistive technology 
Very High   
NLC RIS0000415‐ Mental Health 
Officers – Failure to comply with 
legal obligations 
High   
15

Page 41

NLC RIS0000417 ‐ Communications 
strategies and engagement plans – 
Inadequate strategies not aligned 
with strategic objectives   
High   
NLC RIS000419‐ Non‐ compliance 
with Information Governance & Data 
Protection 
High   
NLC RIS000426‐ Analogue to digital 
transition & ability to provide a 
working community alarm service 
High   
NHS Lanarkshire   Risk   Score   Trend  
1882‐ Acute Sector Bed Capacity ‐ 
availability of acute beds due to 
delays experienced for onwards 
movement of patients 'fit for 
transfer' to care homes, those 
requiring care at home, exacerbated 
by rising cases of Covid and high 
demand 
Very High   
2085 ‐ Capacity within NHSL to 
respond to ongoing challenges due 
to Covid 19 and associated variants 
Very High   
1379‐ Delayed Discharge 
Performance and Impact 
High   
1984‐ Impact From Stepping Down 
Non‐Urgent Services 
High   
1710 ‐ Public Protection: There is a 
risk that NHSL could fail to identify 
harm to any vulnerable person, child 
or adult, or prevent harm to others 
resulting from the complexities of 
opportunity lost due to the current 
High   
16

Page 42

reprioritising of services in response 
to COVID‐19. 
659‐ Failure to deal effectively with 
major emergency 
Very High   
2039 ‐ Staff Fatigue, Resilience, 
Wellbeing & Safety – Effects of 
prolonged Covid response is 
adversely impacting  on staff, 
increasing  staff absence and 
consequently reducing  workforce 
capacity. 
Very High   
1992 ‐ Continuous Covid Response & 
impact on routine PH Screening & 
surveillance programmes 
High   
1587 ‐ Sustainability of the two‐site 
model for the Out‐of‐Hours Service 
Very High   
2004 ‐ Potential Impact on patients 
resulting from disruption of day to 
day clinical care in response to Covid 
pandemic 
Very High   
1989 ‐ Ability to maintain a 
workforce commensurate with the 
need to suppress Covid, deliver 
Vaccination  Programme, Recover & 
Remobilise 
Very High   
2014 ‐ Recovery of Performance 
2021/22 
Very High   
2086‐ Sustaining GP Services  Very High   
 
 
 
17

Page 43

Details of IJB Risk Movement/ Update of Actions   
 
Risk (Reference 
and Title) 
Date Risk 
Added to 
Register  
Review 
Date  
Current 
Score 
Trend  Target 
Score  
Commentary   Actions for the 
risk  
IJB.01/21 
Financial 
Strategic 
Financial 
Challenges 
01/04/2021  31.05.23  High    Medium   'CONTROLS 
1.     IJB PFA Committee. 
2.     IJB Chief Officer is a member of each 
partner's key decision‐making forums. 
3.     Effective joint working between Chief 
Financial Officer and both Council and NHS 
Finance Departments. 
4.     Regular budget meetings with Chief 
Executives and Directors of Finance. 
5.     Regular HSCP budget monitoring 
meetings across Senior Leadership Team. 
6.     The IJB Financial Plan 2023/2024 has 
been agreed and is being reviewed regularly. 
7.     IJB medium term financial plan 2023‐25 
and reserves strategy 2023‐24 approved at 
March 23 IJB 
8.     Capacity plans in place to maximise 
efficiency. 
9.     IJB Integration Scheme setting out the 
budget recovery processes. 
10.   IJB Financial Regulations and financial 
procedures. 
11.   Consultation and involvement with key 
stakeholders including service users and 
carers. 
ACTIONS 
1.    Annual budget 
setting processes 
within each of the 
partners takes 
place before the 
start of each 
financial year.  
2.    HSCP 
participating in 
NHSL 
Sustainability and 
Value process 
3.    Partnership 
will also be 
connected to new 
national whole 
system groups 
around budget 
18

Page 44

12.   Prescribing Quality and Efficiency 
Programme, SWEG, ARG and Home Support 
monitoring groups are in place. 
13.   Joint Strategic Needs Assessment and 
ongoing move towards preventative and 
anticipatory approaches. 
13.   Strategic Planning Group, Locality 
engagement sessions and Partnership 
Boards. 
14.   Effective and ongoing service user 
engagement, staff consultation and Trade 
Union liaison at strategic and local levels. 
15.   Financial sustainability payment 
arrangements in place to 31 March 2023 to 
support external social care providers. 
16.  The Scottish Government announced on 
5 October 2021 an additional £300m for 
winter health and social care pressures.   
18.  Work is ongoing with both partner 
organisations to confirm the final 2023/24 
budget. Once complete, a new risk will be 
created to reflect the final 2023/24 financial 
plan.  
 
 
 
IJB04.21Financial
Strategic 
Notional Set‐
Aside Budget 
01/04/2021  31.05.23  High    Medium   CONTROLS  
1.There is complete transparency and 
ongoing dialogue between the IJB and the 
Health Board on the challenges associated 
with the implementation of the notional set‐
aside concept. 
ACTIONS  
1.The Chief Officer 
and the Chief 
Financial Officer 
continue to raise 
this concern at a 
national level. 
19

Page 45

2.  Bed modelling and capacity planning 
arrangements are in place.  
3. Effective working relationships between 
both partners and the IJB have been 
established.  
4.  Since the inception of the IJB, an 
agreement is in place whereby the NHSL 
Health Board will manage the overspend or 
underspend across the notional set‐aside 
budget.  This arrangement continues to be in 
place for 2022/23 
2. Discussions 
ongoing with 
NHSL Director of 
Finance around 
unscheduled care 
spend in 2023/24 
and potential 
carry forward 
from 22/23 
budget 
IJB05.21 
Financial 
Strategic 
Prescribing 
Activity and 
Costs 
01/04/2021  31/06/23  Very High    Low  CONTROLS 
1.. Prescribing Quality and Efficiency 
Programme. 
2.  Prescribing Management Board functions 
and membership. 
3. Deputy Lead Pharmacist supporting HSCP 
Senior Leadership Team. 
4. Locality Pharmacist input. 
5. Earmarked reserve established to address 
prescribing costs. 
6. Regular HSCP monitoring.  
In respect of the regulation of medicines and 
medical devices, the Medicines and 
Healthcare products Regulatory Agency 
(MHRA) became the UK’s sovereign 
regulator. 
7. The new trade deal contains specific 
clauses that mean both the UK and EEA 
states formally recognise each other’s good 
practice in medicine manufacturing. 
8. To reduce the risk of divergence from the 
EU rules, there are three interrelated 
ACTIONS 
1. Review of 
Locality 
Prescribing Action 
Groups. 
2. Prescribing part 
of NHSL 
Sustainability and 
Value structures 
3.Continuation of 
Scriptswitch. 
20

Page 46

factors; the technical annexes of the new 
trade deal, the Northern Ireland protocol 
and the UK Internal Market Act. 
9. The effectiveness of the Border Operating 
Model to import and export goods to and 
from the EEA, which was being implemented 
in stages from 2020 to minimise any risk of 
disruption, is still being assessed.  The risk of 
border delays is still evident.  Other 
measures were also implemented 
specifically to mitigate the risk of supplies of 
medicines and medical devices being 
disrupted.  In August 2020 the UK 
government instructed medicine suppliers to 
maintain a stockpile equivalent to six weeks’ 
supply though the first three months of 
2021.  In addition, the Department of 
Transport has secured additional freight 
capacity to bring medicines into the country 
via other routes. 
 
 
IJB.1121 
Performance  
Staff Health & 
Wellbeing 
30/08/2021  31.05.23  High    Low  Controls 
1. Strategic Staff Health & Wellbeing 
Committee established reporting to NLC & 
NHSL corporate management teams. 
2. Range of support services available both 
nationally and locally e.g. Occupational 
Health, Spiritual care, Psychological Services, 
national wellbeing hub 
(www.PRoMIS.scot.uk).                                         
3. Rest & Recuperation areas identified.            
4. Peer Support Networks established                
Actions 
1. Short Life 
Working Group for 
wellbeing with 
targeted approach 
for immediate 
actions including 
Staff Health & 
Wellbeing 
Champions, access 
to online supports, 
21

Page 47

5. Well established Occupational Health 
supports available to support staff sickness. 
access to 
Occupational 
Health Services, 
helpline 
established and 
dedicated 
resource 
identified for 
wellbeing officers 
to be recruited. 
2. Funding 
received by 
Scottish 
Government 
specifically 
targeting staff 
wellbeing 
programmes and 
supports. Local 
plans for use of 
funding being 
developed.                
3. Managers 
supporting & 
encouraging staff 
to take planned 
leave/use full 
leave allocation 
4. Audits of 
adherence to 
sickness absence 
policy being 
undertaken 
22

Page 48

5. Findings of the
audit to be shared 
with IJB.  
IJB.13.2021 
Performance 
Care Homes 
30.08.21  31.12.23  Medium   Medium   Controls    
1. Establishment of Care Home Assurance
Team. 
2. Escalation Process in place.
3. National protocol to support discharge of
Covid 19 patients in place. 
Actions  
1. Public Health
teams providing 
guidance on 
infection control. 
2. Care Home
assurance team 
undertaking 
support visits to 
all care homes & 
action plans in 
place for each 
care home. 
3. Staff and visitor
testing in place. 
4. All care homes
advised to use PPE 
in line with 
national 
addendum. 
5. Development
day on 12th May 
23 to agree 
structures and 
approach for year 
ahead 
23

Page 49

IJB.14.2022 
Strategic & 
Performance 
CAMHS 
30.04.22  31.05.23  High  Medium  Controls ‐
1. Prioritisation of referrals; all referrals
1vetted daily with urgent referrals prioritised 
2. Commenced programme of work and
implementation of a more structured 
partnership approach through Choices & 
Partnership Approach (CAPA) service model, 
with tier 1 & 2 referred through 3rd sector 
and interfacing with North & South 
Education Departments 
3. Secured significant national investment to
fully implement new service model 
4. Active review of skill mix to utilise medical
staff only when required for highly complex 
patients 
5. Vacancy gap analysis with active
recruitment commenced.  Expected to have 
recruited 75% of gap by end of May 2023 
6. Continuous review and validation of the
waiting list 
Action 
1. Incremental
implementation of 
the new service 
model 
2. CAPA
appointments 
begin on 1st May 
2023 
3. Refurbishment
of North 
Lanarkshire 
facilities 
commences early 
summer 2023 
4. Progress report
will be submitted 
to IJB approx. Nov 
23.  
IJB.17.2022 
Strategic & 
Performance 
Unscheduled 
Care 
05.09.22  28.06.23  Very High  Medium   CONTROLS 
1. Care Home Assurance Group and
associated supports for care homes through 
liaison service, IPC advice and support, risk 
assessment for onward movement of 
patients etc. 
2. Care at Home Assurance group and
associated activity to try to support and 
sustain independent sector provision 
3. NHS CMT and Covid response group
oversight of performance 
ACTIONS 
1. Expansion of
Home Support 
service 
2. Roll out of
Home Assessment 
Teams across all 6 
Localities by Feb 
3. New CSW roles
in District Nursing 
teams to 
proactively 
24

Page 50

4. Daily PDD meetings to review every 
planned supported discharge and delayed 
discharge 
5. Operation Flow now underway to ensure 
whole system approach to unscheduled 
care/delayed discharge challenges 
support Care 
Managed patients 
4. Additional 
Nursing capacity 
in District Nursing 
Teams 
5. Expansion of 
Equipment and 
Adaptation 
Service to support 
rapid access in 
community 
6. Expansion of 
H@H service 
(hours of provision 
as well as moving 
to support 
discharges as well 
as admission 
prevention) 
7. Expansion of 
Integrated 
Rehabilitation 
Teams in all six 
Localities to 
support rehab in 
the community 
and reduce long‐
term service 
demand 
8. 5 Task and 
Finish groups now 
established to roll 
25

Page 51

out the key 
actions agreed 
through the 
Operation Flow 
programme 
(Phase 2 to be 
completed by Sept 
23) 
 
26

Page 52

REPORT 
Item No: 6 
1. PURPOSE OF REPORT
1.1 This paper is coming to the Performance, Finance and Audit (PFA) Committee:   
For approval  For endorsement  For noting 
1.2 This report provides an overview of the unaudited North Lanarkshire IJB Annual
Accounts for the financial year 2022/2023, in line with the legislative requirements. 
2. ROUTE TO THE PERFORMANCE, FINANCE AND AUDIT COMMITTEE
2.1 This paper has been: 
Prepared By:
Chief Finance
Officer
☒ Reviewed By:
Chief Officer
☒ Endorsed By: ☐ 
3.       RECOMMENDATIONS
3.1  It is recommended that the PFA Committee: 
(1) Approve the Annual Governance Statement and associated reports for
inclusion in the statutory accounts;
(2) Approve the unaudited North Lanarkshire IJB Annual Accounts 2022/2023 at
Appendix 1;
(3) Approve the submission of the unaudited annual accounts to Audit Scotland;
and
(4) Acknowledge the arrangements for publications of the North Lanarkshire IJB
Annual Accounts 2022/2023 in line with the legislative requirements. 
4. VARIATIONS TO DIRECTIONS 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 The Public Bodies (Joint Working) (Scotland) Act 2014 was passed by the Scottish
Parliament on 25 February 2014 and received Royal Assent in April 2014.  This
established the framework for the integration of health and social care in Scotland,
to be governed by Integration Joint Boards with responsibility for the strategic
planning of the functions delegated to it and for ensuring the delivery of its
functions through the locally agreed operational arrangements. 
SUBJECT: North Lanarkshire IJB Unaudited Annual Accounts
2022/2023
TO: Performance, Finance and Audit Committee
Lead Officer for Report: Ross McGuffie, Chief Officer
Author(s) of Report Amanda Kilburn, Chief Financial Officer 
DATE: 21 June 2023
Yes  No  N/A

Page 53

5.2 The IJB is specified in legislation as a ‘Section 106’ body under the terms of the
Local Government Scotland Act 1973 and as such is expected to prepare annual
accounts in compliance with the CIPFA/LASAAC Code of Practice on Local
Authority Accounting in the United Kingdom and International Financial Reporting
Standard (IFRS). 
5.3 LASAAC (The Local Authority (Scotland) Accounts Advisory Committee) and
CIPFA have produced additional guidance on accounting for the integration of
health and social care. 
6. CONCLUSIONS
6.1 This report provides the unaudited North Lanarkshire IJB Annual Accounts for the
financial year 2022/2023 in line with the legislative requirements. 
7. NORTH LANARKSHIRE IJB ANNUAL ACCOUNTS 2022/2023
7.1 The unaudited annual accounts are attached at Appendix 1 and have been
prepared in line with proper accounting practice but remain subject to audit by
Audit Scotland. 
7.2 As prescribed by the Local Authority Accounts (Scotland) Regulations 2014 and in
line with previous years, the unaudited annual accounts will be available for public
inspection in the Council Offices for a three-week period from Monday 3 July 2023
until Friday 21 July 2023 inclusive.  The Regulations also require publication of the
annual accounts on the North Lanarkshire IJB website.  The unaudited annual
accounts are therefore available online from Friday 30 June 2023 until the date the
audited Annual Accounts are published. 
7.3 The proposed sequence of events to approve the North Lanarkshire IJB Annual
Accounts 2022/2023 is summarised in the following table: 
Key Dates Items to be Approved
PFA Committee: 21 June 2023 Approve Annual Governance
Statement and associated reports for
inclusion in the statutory accounts. 
Approve the unaudited annual
accounts at Appendix 1 
Approve the submission of the
unaudited annual accounts to Audit
Scotland.
Audit Scotland: 12 September 2023  Issue of draft letter of Representation
and proposed Independent Auditor’s
Report 
Agreement of audited and unsigned
annual report and accounts
IJB: 27 September 2023 Approve the audited annual accounts.

Page 54

8.  IMPLICATIONS
8.1 NATIONAL OUTCOMES  
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonably practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☐
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☐
Health and Social Care Services contribute to reducing health inequalities  ☐
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care, and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
8.2 ASSOCIATED MEASURE(S) 
None. 
8.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
8.4 RISK ASSESSMENT/RISK MANAGEMENT 
The strategic financial risks detailed in the IJB Risk Register has been updated
where necessary and are included in a separate report to the IJB. 
Relevant Risk Register Details  Current Risk Level Risk Owner 
Financial Challenges High Amanda Kilburn
Ineffective Governance Arrangements Low Ross McGuffie
Notional Set-Aside Budget High Ross McGuffie
Hosted Services Medium Ross McGuffie
Prescribing Activity and Costs Very High Ross McGuffie 
8.5 ENGAGEMENT & PARTICIPATION 
Please tick the engagement and participation objectives that link(s) with this piece
of work and provide further details on the engagement and participation that was
undertaken. 
Objectives  Further details 
☒ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
The Director of Finance of NHSL
and the Head of Financial Solutions
of NLC both continue to be
consulted on the financial position
of the NL IJB.

Page 55

☐ Provide stakeholders with information on
how to get involved 
☐ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design, and
delivery of our services 
☒ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
Financial information is shared with
stakeholders on a regular basis and
is provided to the PFA and IJB on a
quarterly basis.
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings 
☐ Develop participation guidelines to ensure
a common understanding and set of 
expectations for both stakeholders and
partnership staff 
☒ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
IJB Financial Plan and Reserves
Strategy aligns and supports the
IJB Strategic Commissioning Plan
to ensure robust financial
monitoring and scrutiny. 
8.6  INEQUALITIES & FAIRER SCOTLAND DUTY
Equality and Diversity Impact Assessment Completed & Fairer Scotland Impact
Assessment Form Completed and EQIA added to website: 
Yes  No  N/A 
9. BACKGROUND PAPERS 
None. 
10. APPENDICES 
Appendix 1 - North Lanarkshire IJB Unaudited Annual Accounts 2022/2023     
Chief Finance Officer   
Members seeking further information about any aspect of this report, please contact
Amanda Kilburn on telephone number 07816 126362.

Page 56

NORTH LANARKSHIRE 
INTEGRATION JOINT BOARD 
 
ANNUAL ACCOUNTS 
UNAUDITED 
2022/2023

Page 57

Page | 2  
 
CONTENTS 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 
Management Commentary                               
 Purpose                  3 
 The Role and Remit of North Lanarkshire Integration Joint Board    3 
 A Profile of North Lanarkshire             4 
 North Lanarkshire IJB Outcomes for the Year        5 
o Achievements               5 
o Challenges                6 
 Our Priorities and Ambitions for 2023/2026         7 
 Medium Term Financial Plan             8 
 Financial Performance              9 
 Resources Available to the IJB            9 
 Summary of Financial Position 2022/2023          10 
 Reserves Strategy                11 
 Risk Management                12 
 Acknowledgements                13 
 
 
 
 
 
 
 
 
Statement of Responsibilities                          14 
 
 
 
 
 
 
 
 
Remuneration Report                         16 
 
 
 
 
 
 
 
Annual Governance Statement                        19 
 
 
 
 
 
 
 
 
Comprehensive Income and Expenditure Statement      25 
 
 
 
 
 
 
 
 
Movement in Reserves Statement            26 
 
 
 
 
 
 
 
 
Balance Sheet                  27 
Notes to the Financial Statements 
 Note 1: Significant Accounting Policies          28 
 Note 2: Critical Judgements and Estimation Uncertainty      30 
 Note 3: Events after Balance Sheet Date          30 
 Note 4: Expenditure and Income Analysis by Nature       31 
 Note 5: Taxation and Non‐Specific Grant Income        31 
 Note 6: IJB Operating Costs              32 
 Note 7: Short Term Debtors and Creditors          32 
 Note 8: Usable Reserves              32 
 Note 9: Related Party Transactions            33 
 Note 10: Covid‐19 Costs and Funding           34 
 Note 11: Hosted Services              35 
 Note 12: Additional Council Services Delegated to the IJB      36 
 Note 13: VAT                  36 
 Note 14: External Audit Costs             36 
 Note 15: New Standards Issued but not yet Adopted      36

Page 58

Page | 3  
 
MANAGEMENT COMMENTARY 
Purpose 
This publication contains the financial statements of North Lanarkshire Integration Joint Board (IJB) for the 
year ending 31 March 2023. 
 
The management commentary provides an overview of the key outcomes relating to the objectives and 
strategy of the IJB.  It considers our financial performance for the year 2022/23 and looks forward, 
outlining our future financial plans and the challenges and risks that we will face as we strive to meet the 
needs of the people of North Lanarkshire. 
 
Faced with the unprecedented challenges of Covid‐19, followed by the continued cost of living crisis, the 
IJB entered into a phase of recovery and remobilisation.  By working with our partners, staff and 
communities, our services have responded effectively to this ongoing crisis by protecting lives and keeping 
people safe but also recognising that the future will require new and innovative solutions to support 
continued recovery and increased levels of demand created by the pandemic. 
 
The IJB and Health and Social Care Partnership (HSCP) Senior Management Team would like to extend our 
gratitude for the magnificent work our staff continue to undertake despite the challenges they face on a 
daily basis, ensuring that services to those in need continue to be delivered safely and effectively. 
 
The Role and Remit of North Lanarkshire Integration Joint Board 
North Lanarkshire IJB, formally established on 1 April 2016, has responsibility for the strategic planning and 
commissioning of a wide range of health and social care services within North Lanarkshire.  These functions 
delegated to the IJB, under the Public Bodies (Joint Working) (Scotland) Act 2014, are detailed in the formal 
partnership agreement between the two partner organisations, North Lanarkshire Council (NLC) and NHS 
Lanarkshire (NHSL) referred to as the Integration Scheme1. 
 
The IJBs primary purpose is to set the strategic direction for the delegated functions through its Strategic 
Commissioning Plan and includes: 
 
 accident and emergency services provided in a hospital; 
 inpatient services related to general, geriatric, rehabilitation, and respiratory medicine; 
 palliative care services; 
 community health services; and 
 social care services. 
 
The IJB comprises of eight voting members, made up of four Elected Members appointed by NLC and four 
Non‐Executive Directors appointed by NHSL.  Non‐voting members include the Chief Officer, Chief Finance 
Officer, service professionals, third sector, service users, carers, and staff representatives. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1 HSCP North Lanarkshire Integration Scheme 
Our Purpose 
People of North Lanarkshire will achieve their full potential through: 
 living safe, healthy, and independent lives in their communities; and 
 receiving the information, support and care they need, efficiently and 
effectively, at the right time and in the right way.

Page 59

Page | 4  
 
A Profile of North Lanarkshire 
A full profile of North Lanarkshire IJB is set out in the Strategic Commissioning Plan 2023/2026.  Some of 
the key population characteristics include the following: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
By mid‐2043, the 0 to 15 age group is projected to see the largest decrease (‐11%). 
75 and over age group is projected to see the largest percentage increase (+53.5%). 
In 2021/22, 13.5% of Lanarkshire residents were living with three or more long term 
health conditions. 
North Lanarkshire has a higher rate per 1,000 population compared to Scotland for 
several health indicators including A&E attendances, acute emergency hospital 
admissions, readmissions, NHS24 calls and alcohol and drug related hospital 
admissions.
10% of North Lanarkshire population is identified as being in a caring role with early 
indication that this number is set to rise. 
In North Lanarkshire, life expectancy at birth was higher for females (79.2 years) then 
for males (74.5 years) in 2018‐2020, however both male and female remains below that 
of the Scottish average. 
North Lanarkshire Population is 341,400. 
There are 24,796 working‐age people in North Lanarkshire experiencing employment 
deprivation.  This is 11% of the working‐age population.   
Across North Lanarkshire 15% of people are income deprived.  The Scottish average is 
12%.

Page 60

Page | 5  
 
North Lanarkshire IJB Outcomes for the Year 
The achievements and challenges highlighted below represent some of the common themes which 
emerged in our engagement activities with staff and our stakeholders. 
 
Achievements 
Resilience Within the System – staff, carers, and service users 
A common thread through all our engagement activity was the recognition of the efforts and resilience of 
members of staff from across the health and social care sector, volunteers, carers, service users and family 
members in dealing with the many challenges of the pandemic. 
 
Focus on Staff Health, Wellbeing, and Connectedness 
Training, practical, and psychological supports have been developed for staff wellbeing across the Health 
and Social Care Partnership (HSCP) over the past two to three years.  These initiatives are now aligned and 
incorporated within the major strategic workplans of both the partnership, NLC and NHSL which will 
inform and shape the way we work going forward by engaging with staff, embedding good practise in our 
ways of working and improving our methods of supporting staff in the longer term. 
 
Care Academy 
The Health and Social Care Academy provides curriculum opportunities linked to the health and social care 
sector.  These are targeted at young people in the senior phase of learning from the nine secondary 
schools in North Lanarkshire.  It is focused on assisting pupils to gain qualifications as well as work related 
learning experiences which will help them in gaining employment and assist in meeting the workforce 
requirements of the sector.  The main areas are health and social care, general nursing, and allied health 
professions. 
 
Community Solutions – community capacity building 
Community Solutions is the community led, health and social care investment programme operating across 
North Lanarkshire, focused on building communities where people can have full, independent lives.  The 
programme, which has been in place since 2013, is a partnership between HSCP, Voluntary Action North 
Lanarkshire (VANL), the community and the voluntary sector of North Lanarkshire.  Its latest Strategy and 
Investment Plan 2022/2025 was agreed in March 2022, setting out investment plans within the 
programme to strengthen community capacity and resilience and deliver person‐centred, community‐
based support and services to priority groups. 
 
Enhanced Capacity and Resilience 
In February 2022, the IJB approved a £20m business case utilising both recurring and non‐recurring funding 
to transform the whole health and social care system by building capacity and resilience within it.  Building 
on the wider approach to recovery and renewal across the sector, investment has started to be made in 
supports and approaches which: 
 
 maximise capacity through new staffing, resources, and services; 
 ensure staff wellbeing; 
 ensure system flow by improving planned discharge from hospital and increasing access to care in a 
range of community settings; and 
 improve outcomes through collective investment in people, systems, services and supports which 
deliver the right care in the right setting.

Page 61

Page | 6  
 
Use of Technology – within a variety of settings 
The use of technology has expanded considerably over the past three years, and the experience of the 
Covid‐19 restrictions resulted in the acceleration of our plans to use technology more in relation to online 
appointments and consultations, technology enabled care and also as a key element of our communication 
and day‐to‐day management. 
 
Mental Health Renewal and Recovery 
The recovery and renewal of our mental health services continues to progress and the importance of 
linking these efforts with our new priorities was reflected in engagement discussions and feedback. 
 
Challenges 
Demographic Growth and Demand 
Health and social care services are experiencing increasing demand due to demographic growth, an ageing 
population, complexity of care needs, and deprivation.  It remains to be seen how detrimental the lasting 
impacts of Covid‐19 will have on our communities, but we project this will result in negative impacts on the 
health of our residents in the future and subsequently as a direct result, an increase in pressures on our 
services.  
 
Cost of Living Crisis and Widening Inequalities 
Given the current challenges in relation to the cost‐of‐living crisis, the wider issues of poverty and income 
deprivation were highly prevalent in discussions which emerged in our engagement activities.  There are 
significant and persistent inequalities in outcomes across the North Lanarkshire population that have a 
significant impact on people’s life opportunities and life chances.  There is strong evidence to suggest the 
experience of the pandemic has widened inequalities with some sectors of society disproportionately 
affected by the disruption and restrictions.  The current cost of living crisis will also disproportionately 
affect those with lower incomes. 
 
Staff Recruitment and Retention 
The wider health and social care sector have experienced challenges related to the recruitment and 
retention of staff for some time, with the recent experiences of the pandemic and the withdrawal from the 
European Union placing further pressure on an already challenging situation.  There is a need to invest in 
the workforce through training and development with clear career pathways, to ensure we make 
employment within the sector as attractive as possible.  Through a values‐based approach we need to offer 
flexible and positive working environments with an embedded culture of staff wellbeing. 
 
National Care Service 
The independent review of Adult Social Care recommended the creation of a National Care Service (NCS) 
and a system of care which took a human right based approach with a focus on incorporating the views of 
those with lived experience about what needs to change to make real and lasting improvements.  The 
aspirations of the NCS represent a progression from the Scottish Government’s Health and Social Care 
Delivery Plan and supports their long‐standing desire to shift the balance of care and support from hospital 
to a community care setting.  The outcome of this review is currently subject to ongoing consultation and 
will be used to shape and develop the new legislation, with the intention that the NCS will be fully 
functioning by the end of the Parliamentary term in 2026.  This will impact on the delivery of services and 
over the next 2 – 3 years, proposed changes will have a direct impact on colleagues working in health and 
social care resulting in uncertainty and increased work challenges as we prepare for the implementation of 
the NCS.

Page 62

Page | 7  
 
Our Priorities and Ambitions for 2023/2026 
The long‐term vision for North Lanarkshire HSCP which was set out in the original Strategic Plan 
2016/20262 remains relevant and will continue as our over‐arching vision.  Our Strategic Commissioning 
Plan 2023/20263 sets out our commitment to achieve our long‐term ambitions.  Only by working together, 
can we bring about real change to improve the overall health and wellbeing for the people of North 
Lanarkshire. 
 
We continue to experience the long‐term and lasting impact of the Covid‐19 pandemic, whilst working 
with people to ensure they can access the support and treatment they require following a sustained period 
of disruption and restriction.  This new plan will help to inform financial planning and how we allocate our 
resources to the programme of work 2023/2026.  To enable us to measure how well we are doing, our 
achievements will be measured and reported against a range of national and local performance measures 
including the nine national health and wellbeing outcomes below. 
 
NATIONAL HEALTH & WELLBEING OUTCOMES
People are able to look after and 
improve their own health and 
wellbeing and live in good health 
for longer. 
People, including those with 
disabilities or long‐term 
conditions or who are frail, are 
able to live as far as reasonably 
practicable, independently and at 
home or in a homely setting in 
their community. 
People who use health and social 
care services have positive 
experiences of those services, and 
have their dignity respected. 
 
People who work in health and 
social care services feel engaged 
with the work they do and are 
supported to continuously 
improve the information, support, 
care, and treatment they provide. 
People who provide unpaid care are 
supported to look after their own 
health and wellbeing, including to 
reduce any negative impact of their 
caring role on their own health and 
wellbeing. 
 
Health and social care services are 
centred on helping to maintain or 
improve the quality of life of 
people who use those services. 
Resources are used effectively 
and efficiently in the provision of 
health and social care services. 
Health and social care services 
contribute to reducing health 
inequalities. People using health and social 
care services are safe from harm. 
 
Following our engagement with stakeholders, taking into account the experience of the past three years 
and the current and future challenges facing the partnership, we have revised our ambitions to the 
following: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2 Strategic Plan 2016/2026 
3 Strategic Commissioning Plan 2023/2026 
Strategic 
Commissioning 
Plan            
2023/2026
Do the 
right 
thing first 
time
Increased focus 
on prevention, 
early 
intervention 
and tackling 
inequalities
Improve 
mental 
health and 
wellbeing
Develop and 
support a 
workforce for 
the future
Support 
people 
through a 
whole family 
approach

Page 63

Page | 8  
 
Clearly, these priorities are interlinked, and we expect them to influence and shape each other as we 
progress our implementation.  Under each priority area we will develop an agreed set of medium‐term 
goals that we plan to address between 2023 and 2026.  The Programme of Work will set out in detail the 
programmes that will be progressed over the next three years and will be annually updated to ensure that 
we stay on track, and at the same time, be able to respond to any new or emerging issues that we need to 
address.  We will closely monitor our progress and continue to seek feedback from service users, carers, 
and families on the impact we are making. 
 
Medium Term Financial Plan 2023/2026 
The North Lanarkshire IJB Medium to Long Term Financial Plan 2020/2030, outlined the anticipated 
financial challenges and opportunities that the partnership expected over the ten‐year period and 
provided a framework which would support the partnership to remain financially sustainable. 
 
The impact of Covid‐19 on health and social care services and the economy created considerable 
unanticipated pressures, and therefore the partnerships governance arrangements were reviewed and 
adapted to support the response, and redesign of services.  Whilst many of the elements in the previous 
financial plan remain, the pandemic and ensuing cost of living crisis has accelerated the delivery of some of 
our objectives, made others increasingly important and lowered the priority of some of our previously 
agreed actions.   
 
Alongside the development of the new Strategic Commissioning Plan 2023/2026, it is consequently 
necessary to update our supporting plan to a Medium‐Term Financial Plan (MTFP).  The new MTFP 
2023/20264 reflects the impact of recovering from Covid‐19 and other challenging factors facing the IJB.  It 
has been condensed to a three‐year plan rather than the original ten‐year plan due to the pending 
formation of the National Care Service and the continuing uncertainty around future funding. 
 
By linking the MTFP to the plans and actions below, we ensure that consideration is given to all areas of 
our business, rather than concentrating on standalone objectives: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4 Medium‐Term Financial Plan 2023/2026 
Medium Term 
Financial Plan
Reserves 
Strategy
Engaging with 
Partner Bodies
Supporting 
Transformation
Workforce 
Planning
Strategic 
Commissioning 
Plan
Financial 
Management 
and Planning
Budget Setting 
Process

Page 64

Page | 9  
 
As was the case prior to the pandemic, the IJB’s financial planning arrangements remain subject to active 
review, to enable us to continue to plan for a range of potential outcomes and scenarios.  This helps us to 
manage emerging financial risks and challenges and the likely impact these could have on the financial 
position of the IJB.  The financial position for public services continues to be challenging and it is therefore 
important that the IJB’s ambitions are set within the content of the funding available.  The aspiration to 
prepare a balanced budget covering a longer term will support the development of strategic savings plans 
and ensure the available resources are allocated effectively across competing priorities.  This aspiration 
however is dependent on the certainty of the financial settlement from the Scottish Government. 
 
Both partners have a proven track record of managing budgets effectively over many years.  A clear 
strategy is required to ensure the IJB continue to remain financially sustainable over the medium term.  
The limited financial and workforce resources will require to be focussed on services which are sustainable 
and are targeted to those with the greatest need.  In preparing the financial plan, a co‐ordinated and 
strategic approach across the partnership has been adopted with both partners including the cost 
pressures in relation to their delegated functions. 
 
A range of outcomes will continue to be analysed and the financial planning assumptions updated as the 
most likely scenarios emerge for future years.  The Scottish Government aspiration to move to multi‐year 
settlements in the future is welcome and would reduce the uncertainty which is currently impacting on 
strategic commissioning activity across the health and social care partnership.                         
 
Financial Performance  
The financial year 2022/2023 has brought a fresh set of challenges including continued recovery from the 
pandemic, the current cost of living crisis, a changing demographic profile, staffing shortages and increased 
demand for services. 
 
Through regular updates to the IJB from the Chief Finance Officer (CFO) and by ensuring decisions made 
throughout 2022/2023 were taken to support financial sustainability, the HSCP has successfully managed 
to deliver year on year financial balance.  This has been achieved through a combination of: 
 
 Flexible use of recurring and non‐recurring resources. 
 Creation and use of reserves for specific commitments. 
 Delivery of approved savings through service redesign and removing duplication. 
 Workforce planning and focusing on services that are sustainable in line with our Strategic 
Commissioning Plan. 
 Implementing a co‐ordinated and strategic approach across the partnership. 
 Effective governance and audit controls. 
 
Resources Available to the IJB 
North Lanarkshire IJB delivers and commissions a range of health and social care services to our local 
population.  This is funded through budgets delegated from both NHS Lanarkshire and North Lanarkshire 
Council.  The level of funding available to the IJB is therefore heavily influenced by these organisations 
grant settlement from Scottish Government.

Page 65

Page | 10  
 
The combined recurring and non‐recurring budgets available to the IJB in 2022/2023 to take forward the 
commissioning intention in line with the Strategic Commissioning Plan, is circa £764m.  Included within the 
resources available is a ‘Large Hospital Services’ (Set Aside) budget totalling £69.120m.  This budget is in 
respect of the functions delegated by the Health Board which are carried out in a hospital setting.  The Set 
Aside budget for delegated services provided in acute hospitals is determined by apportioning the hospital 
expenditure to individual patient episodes, separating out episodes for services delegated to the IJB from 
those that are not, and assigning these to the relevant IJB based on postcode. 
 
 
 
Summary of Financial Position 2022/2023 
Throughout 2022/2023 the CFO financial monitoring report to the IJB projected an underspend, prior to 
the transfer of year end balances to reserves.   
 
The year end underspend totalled £35.495m.  Adjustments incurred against reserves in 2022/2023 totalled 
£57.001m leaving a deficit on the provision of services of £21.506m as shown in the Comprehensive 
Income and Expenditure Statement on page 25 and Movement in Reserves on page 26. 
 
North Lanarkshire HSCP 
Final Outturn 
2022/2023 
£m 
HSCP Underspend as at 31 March 2023  (35.495) 
Adjustments to Reserves:   
Drawdown of Reserves for IJB Use 
COVID‐19 Funding Returned to Scottish Government 
In Year Adjustment 
31.193 
25.916 
(0.108) 
Deficit on Provision of Services (Page 25)  
Movement in Reserves (Page 26) 
 21.506 
 
The following provides a high‐level summary of the key pressures and the main reasons why the IJB’s final 
outturn resulted in an underspend against its budget in 2022/2023: 
 
 
 
 
Employee Costs net underspend of £17.377m is in relation to ongoing challenges in terms of recruitment and retention of 
staff across all service areas.  This underspend also includes Scottish Government funding of £8.270m allocated to help 
address the current staffing pressures.  This funding will be carried forward into 2023/2024 within specific ring‐fenced 
reserves to be used in 2023/2024.

Page 66

Page | 11  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The cost of services incurred in 2022/2023 is compared to the previous two years in the table below: 
 
 
 
Reserves Strategy 
The IJB has the same legal status as a local authority and is therefore able to hold reserves under section 
106 of the Local Government (Scotland) Act 1973.  A reserve strategy was developed to provide security 
against unexpected cost pressures and to aid financial stability.   
 
The IJB Reserves Strategy 2022/2023 allows for flexibility in terms of potential fluctuations.  This allows for 
the IJB to increase contingency reserve balances significantly where resources permit providing future 
financial resilience for those years where the level of resources available to the IJB may be significantly 
constrained and will require a draw down from these reserves in order to deliver financial balance.   
 
 
To protect the financial resilience of the IJB in the context of an increased financial risk profile, the IJB 
transferred £7.885m from the 2022/2023 in year underspend to contingency reserves.  This provides a 
total contingency reserve of 3% of our financial envelope and aligns to the recommendation in our IJB 
Reserve Strategy of holding a 3% contingency reserve where possible. 
2020/2021 2021/2022 2022/2023
£m £m £m
Social Care Services 189.048 202.610 236.972
Health Care Services 65.557 74.073 74.527
Family Health Services 105.773 109.652 115.625
Delegated Services 1.281 2.207 2.437
Hosted Services 141.034 149.126 159.642
IJB Operating Costs 0.212 0.214 0.247
Prescribing Costs 69.088 68.739 71.332
Covid‐19 Costs 21.342 13.412 7.072
Set Aside 63.066 65.164 69.120
Income (2.507) (3.800) (4.717)
COST OF SERVICES 653.894 681.397 732.256
North Lanarkshire HSCP Services
Payments to Other Bodies net underspend of £1.511m is primarily due to the staff shortages and vacancies within the Care 
at Home sector who provide services to individuals via the self‐directed support commissioning framework. 
Admin Costs net underspend of £1.431m.  This is ring‐fenced carers funding that will be transferred to a dedicated 
earmarked reserve to fund carers pressures in 2023/2024.
Mental Health, Alcohol and Drug Partnership and HSCP Planning combined net underspend in non‐pays totalling 
£13.330m.  This is due to additional funding received from Scottish Government (£13.141m) which will be carried forward 
into 23/24 and allocated against new spending plans. 
Prescribing net overspend of £1.750m is due to activity and cost per item being 3.19% higher compared to 2021/2022.  
Due to the uncertainty around costs and prescribing activity, the volatility experienced within prescribing is likely to 
continue for the foreseeable future. 
Supplies and Services net overspend of £2.531m is due to additional purchases of PPE and staff uniform due to the 
increase in home support staff and costs associated with winter planning.  There has also been additional expenditure in 
relation to aids and adaptations to meet current demand.  £1.550m additional income was drawn down from earmarked 
reserves to offset some of this overspend and is showing in the over recovery of income.
Income over‐recovery of £6.031m for Social Care is due to the drawdown of earmarked reserves to offset expenditure 
relating to winter planning, adaptations, digital and IT and staffing costs.

Page 67

Page | 12  
 
The IJB also has committed actions attached to the Strategic Commissioning Plan and funding is therefore 
earmarked to specific projects to allow spend to be managed in a way that represents best value for the IJB 
to achieve its national outcomes.  It is also important that in year funding available for government 
priorities are able to be ring‐fenced and carried forward into the following financial year.  As these funding 
allocations are to meet specific commitments, they must be carried forward to meet the conditions 
attached to their receipt.  The table below shows the breakdown of the underspend transferred to 
reserves at year end: 
 
 
 
 
 
 
 
Risk Management 
The IJB Risk Management Strategy, which was updated and approved by the IJB in March 2023, 
complements the existing risk management processes within each partner by ensuring risk reports form a 
substantial item of business at all IJB meetings.  There are three main risk registers across the partnership: 
 
 IJB risk register outlining the strategic risks to the IJB; 
 Health operational risk register, hosted within the NHS Lanarkshire system; and 
 Social Work operational risk register, hosted within North Lanarkshire Council system. 
 
Strong ties have been maintained with the corporate risk managers in both partner organisations and the 
IJB Risk Management Strategy, has been developed in conjunction with these leads, linking closely to both 
the North Lanarkshire Council and NHS Lanarkshire Risk Management Strategies.   
 
At time of writing, there are currently seventeen open risks identified within our North Lanarkshire IJB Risk 
Register with two of these risks rated as very high and eight rated as high.  The table below shows a 
summary of these: 
 
Category  Description of Risk Summary Current 
Risk Level 
Financial  Financial Challenges: There are a range of financial challenges which will impact on the IJB’s 
ability to deliver the Strategic Commissioning Plan with the financial envelope available. 
High
Financial  Ineffective Governance Arrangements: There is a risk that the IJB is unable to prevent and 
detect fraud and corruptions within services due to inadequate governance arrangements and 
internal controls. 
Low
Financial  Set‐Aside Budget: There is a risk that the resources will not be transferred from Acute Services 
to the HSCP in line with the shift in the balance of care. 
High
Financial  Hosted Services: There is a risk of dispute between the North and South Lanarkshire IJB in 
respect of the financial allocations underpinning the Hosted Services budget. 
Medium
Financial  Prescribing: Prescribing costs may escalate due to the increases in activity and price volatility, 
new drugs becoming available, the response to Covid‐19 and the impact of the EU withdrawal. 
Very High
Financial 
  Third and Voluntary Sector: There is a risk our third sector organisations are vulnerable 
because of lack of certainty in respect of long‐term funding, leading to instability and 
recruitment and retention challenges. 
Low
Financial  Ineffective Governance Arrangements Due to Covid‐19 Pandemic: There is a risk that the 
intensity of the required response to Covid‐19 could result in a failure of governance. 
Medium
Analysis of Transfer to IJB Reserves  £m 
Ring‐Fenced Reserves  21.411
Earmarked Reserves  6.199
Contingency Reserves  7.885
Total  35.495

Page 68

Page | 13  
 
Category  Description of Risk Summary (Continued) Current 
Risk Level 
Performance  Oversight of Performance Activity: There is a risk the IJB is not provided with adequate or 
sufficient performance information to enable it to discharge its scrutiny and oversight role. 
Low
Performance  Staff Health & Wellbeing: There is a risk to the delivery of the Strategic Commissioning Plan as 
a result of sustained pressures on staff availability due to pressures, sickness, and 
redeployment. 
High
Performance  Care Homes: Inability of care homes to sustain service due to staffing or Covid outbreaks 
resulting in closure to new placements. 
Medium
Performance  Service Sustainability: There is a risk that the IJB will be unable to implement the strategic 
plan.  Failure to achieve the desired IJB strategic aims poses a risk on operational service 
delivery.  
High
Performance  Workforce Sustainability: It is becoming increasing difficult to recruit to particular roles across 
Health and Social Care.  Gaps in the workforce can result in reduction of service provision, 
increase in staff workload and inability to deliver the strategic plan. 
High
Strategic & 
Performance 
Children and Adolescent Mental Health Services: There is a risk that the CAMHS service 
cannot meet the increasing clinical demands due to a significantly high number of staff 
vacancies and recruitment challenges. 
High
Strategic & 
Performance 
Cost of Living: There is a risk that the Strategic Commissioning Plan will be unable to be 
delivered or not have the desired impact due to the cost‐of‐living increases being faced by 
residents. 
High
Strategic & 
Performance 
Unscheduled Care: There is a risk that we cannot sustain whole system patient flow through 
peak winter pressures due to increased front door demand, hospital workforce capacity, 
delays in onward movement of patients and HSCP workforce capacity. 
Very High
Strategic & 
Performance 
Community Alarms: There is a risk the community alarm system will be destabilised due to the 
national change from analogue to digital telephony by 2025. 
Medium
Strategic 
  National Care Service: The ongoing work around the NCS could destabilise current service 
delivery due to significant change activity, time demands and staff uncertainty. 
High
 
Acknowledgements 
We would like to acknowledge the significant effort required to both produce the annual accounts and 
successfully manage the finances of the IJB and to record our thanks to the Finance teams in both North 
Lanarkshire Council and NHS Lanarkshire and colleagues in other services within the Partnership for their 
continued hard work and support. 
 
 
 
Councillor Ayeshah Khan 
Chair, North Lanarkshire Integration Joint Board 
Date:   
 
 
 
Ross McGuffie 
Chief Officer 
Date:   
 
 
 
Amanda Kilburn FCCA 
Chief Finance Officer 
Date:

Page 69

Page | 14  
 
STATEMENT OF RESPONSIBILITIES 
 
Responsibilities of the North Lanarkshire Integration Joint Board  
 
The North Lanarkshire Integration Joint Board is required to: 
 
 Make arrangements for the proper administration of its financial affairs and to ensure that the proper 
officer of the board has responsibility for the administration of those affairs (section 95 of the Local 
Government (Scotland) Act 1973).  In this IJB, that officer is the Chief Finance Officer. 
 Manage its affairs to secure economic, efficient, and effective use of resources and safeguard its assets. 
 Ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority Accounts 
(Scotland) Regulations 2014), and so far, as is compatible with that legislation, in accordance with 
proper accounting practices (section 12 of the Local Government in Scotland Act 2003). 
 Approve the Annual Accounts.  
 
I confirm that these Annual Accounts were approved for signature at a meeting of the North 
Lanarkshire Integration Joint Board on xx. 
 
Signed on behalf of the North Lanarkshire Integration Joint Board 
 
 
 
 
 
 
 
Councillor Ayeshah Khan                                                                                  Date:  
Chair, North Lanarkshire Integration Joint Board

Page 70

Page | 15  
 
Responsibilities of the Chief Finance Officer 
The Chief Finance Officer is responsible for the preparation of the Integration Joint Board’s Annual 
Accounts in accordance with proper practices as required by legislation and as set out in the CIPFA/LASAAC 
Code of Practice on Local Authority Accounting in the United Kingdom (Accounting Code).  
 
In preparing the Annual Accounts, the Chief Finance Officer has: 
 
 Selected suitable accounting policies and then applied them consistently. 
 Made judgements and estimates that were reasonable and prudent. 
 Complied with legislation. 
 Complied with the Local Authority Code (in so far as it is compatible with legislation). 
 
The Chief Finance Officer has also: 
 
 Kept proper accounting records which were up‐to date. 
 Taken reasonable steps for the prevention and detection of fraud and other irregularities. 
 
I certify that these Annual Accounts present a true and fair view of the financial position of the North 
Lanarkshire Integration Joint Board as at 31 March 2023 and the transactions for the year then ended. 
 
 
 
 
 
 
 
Amanda Kilburn FCCA                                                                                          Date: 21 June 2023 
Chief Finance Officer

Page 71

Page | 16  
 
REMUNERATION REPORT 
 
The Local Authority Accounts (Scotland) Regulations 2014 (SSI No. 201/200) require local authorities and 
IJBs in Scotland to prepare a Remuneration Report as part of the annual statutory accounts. 
 
The information in the tables below is subject to external audit.  The explanatory text in the Remuneration 
Report is reviewed by Audit Scotland to ensure it is consistent with the financial statements. 
 
Voting Board Members 
Voting IJB members constitute councillors nominated as board members by constituent authorities and 
NHS representatives nominated by the NHS Board.  The voting members of North Lanarkshire IJB were 
appointed through nomination by North Lanarkshire Council and NHS Lanarkshire. 
 
The regulations require disclosure of remuneration information for ‘relevant’ persons. A ‘relevant’ person 
in relation to the Remuneration Report includes a senior officer holding office with associated authority, 
whether on a permanent or temporary basis, in the financial year to which that Remuneration Report 
relates. 
 
The Board Members do not receive remuneration or expenses directly from the IJB.  Any remuneration or 
reimbursement of expenses for voting board members is governed by the relevant IJB partner 
organisation.  The IJB does not provide any additional remuneration to the Chair, Vice Chair or any other 
board members relating to their role on the IJB.  The IJB does not reimburse the relevant partner 
organisations for any voting member costs by the partner. 
 
 
 
 Vice Chair vacant from 1 April 2022 to 21 June 2022. 
 
The IJB does not have responsibilities, either in the current year or in future years, for funding any pension 
entitlements of voting IJB members.  Therefore, no pension rights disclosures are provided for the Chair or 
the Vice Chair. 
 
There were no exit packages payable during the financial year. 
 
 
 
Taxable 
Expenses 
2021/2022   
£
Name Post Held* Nominated by
Taxable 
Expenses 
2022/2023  
£
IJB Chair
(1 April 2022 to 21 June 2022)
IJB Chair
(22 June 2022 to 24 August 2022)
IJB Chair
(25 August 2022 to 31 March 2023)
IJB Vice Chair
(22 June 2022 to 31 March 2023)
‐
‐
‐
‐
‐
‐
‐
‐
Cllr Ayeshah Khan North Lanarkshire Council
Brian Moore NHS Lanarkshire
Cllr Tracy Carragher North Lanarkshire Council
Cllr Paul Kelly North Lanarkshire Council

Page 72

Page | 17  
 
Officers of the IJB 
The IJB does not directly employ any staff in its own right however specific post‐holding officers are non‐
voting members of the Board. 
 
The Chief Officer and the Chief Finance Officer are appointed by the North Lanarkshire IJB and employed 
by North Lanarkshire Council.  Both posts are seconded to the IJB in line with the local arrangements. 
 
The senior officers received the following remuneration in the period: 
 
 
 
 M Moy, Chief Finance Officer was also appointed to the South Lanarkshire IJB from 1 April 2021 to 6 
May 2022.  Therefore, the remuneration disclosed above for this post, is the proportion of 
remuneration received solely in relation to the activity of the North Lanarkshire IJB.  
 
 FYE: Full Year Estimate includes an estimate of the full year salary from 1 April 2022 for Amanda Kilburn 
who started as Chief Finance Officer on 22 August 2022 and a proportion of full year salary to 31 March 
2023 for Marie Moy who left as Chief Finance Officer on 6 May 2022. 
 
Pay band information is not separately provided as all staff pay information has been disclosed in the 
information above. 
 
Pension Benefits 
In respect of officers’ pension benefits the statutory liability for any future contributions to be made rests 
with the relevant employing partner organisation.  On this basis, there is no pension liability reflected on 
the IJB balance sheet for the Chief Officer or the Chief Finance Officer.   
 
The IJB however, has responsibility for funding the employee contributions for the current year in respect 
of the officer time spent fulfilling the responsibilities of their role on the IJB.  The following table shows the 
IJB’s funding during the year to support officers’ pension benefits.  The table also shows the total value of 
the accrued pension benefits which may include benefits earned in other employment positions and from 
each officer’s own contributions. 
 
Total Earnings  Total Earnings *
2021/2022 2022/2023
£ £
Ross McGuffie 
Chief Officer 
1 April 2022 to 31 March 2023
Marie Moy
Chief Finance Officer 
1 April 2022 to 6 May 2022
Amanda Kilburn 
Chief Finance Officer 
22 August 2022 to 31 March 2023
‐ 45,844           
(FYE 74,370)
Name and Post Title*
102,352 112,098
36,631 3,645            
(FYE 38,004)

Page 73

Page | 18  
 
 
 
 The pension contribution and benefits for M Moy, Chief Finance Officer relate to the proportion 
attributable to the activity of the North Lanarkshire IJB based on a pro‐rata approach. 
 
 
 
 
Councillor Ayeshah Khan 
Chair, North Lanarkshire Integration Joint Board 
Date:   
 
 
 
 
Ross McGuffie 
Chief Officer 
Date:   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
For Year to 
31/03/2022
For Year to 
31/03/2023
As at 
31/03/2022
As at 
31/03/2023
£ £ £000 £000
Pension 10 12
Lump Sum ‐ ‐
Pension 16 ‐
Lump Sum 22 ‐
Pension ‐ 15
Lump Sum ‐ ‐
Amanda Kilburn          
Chief Finance Officer ‐ 8,848
Name and Post Title
In Year Pension Contribution* Accrued Pension Benefits*
Marie Moy              
Chief Finance Officer
Ross McGuffie           
Chief Officer 21,291 21,635
7,058 365
Description

Page 74

Page | 19  
 
ANNUAL GOVERNANCE STATEMENT 
 
The Annual Governance Statement reports on the effectiveness of the IJB’s governance arrangements and 
system of internal control and explains how the IJB complies with the Code of Corporate Governance and 
meets the requirements of the ‘Delivering Good Governance in Local Government’ framework developed 
by CIPFA and SOLACE in 2016.   
 
Scope of Responsibility 
The IJB is responsible for ensuring that its business is conducted in accordance with the law and 
appropriate standards, that public money is safeguarded, properly accounted for, and used economically, 
efficiently, and effectively.  The IJB also aims to foster a culture of continuous improvement in the 
performance of the IJB’s functions and to make arrangements to secure best value. 
 
To meet this responsibility, the IJB has established arrangements for governance which includes a system 
of internal controls.  The system is intended to manage risk to support the achievement of the IJB’s 
policies, aims and objectives.  Reliance is also placed on the North Lanarkshire Council and NHS Lanarkshire 
systems of internal control which support compliance with both organisations’ policies and promotes 
achievement of each organisations aims and objectives, as well as those of the IJB.  This system can only 
provide reasonable and not absolute assurance of effectiveness.  
 
Purpose of the Governance Framework 
The governance framework comprises the systems and processes, and culture and values, by which the IJB 
is directed and controlled.  It enables the IJB to monitor the achievement of the objectives set out in the 
IJB’s Strategic Commissioning Plan.  The governance framework is continually updated to reflect best 
practises, new legislative requirements, and the expectations of stakeholders. 
 
The system of internal control is based on an ongoing process designed to identify and prioritise the risks in 
the achievement of the IJB’s objectives, to evaluate the likelihood of those risks being realised, the impact 
should they be realised, and to manage them effectively. 
 
Governance Framework and Internal Control System 
The IJB comprises of eight voting members, with one from each partner organisation assuming the role of 
Chair and Vice Chair.  Four are Council Members nominated by North Lanarkshire Council and four are 
Non‐Executive Members appointed by NHS Lanarkshire.  The term of office is for a period of three years.  
There are also a number of non‐voting professional and stakeholder members on the IJB board.  
Stakeholder members currently include third sector, carers, staff representatives, service users and 
professional members including the Chief Officer and Chief Finance Officer.  The IJB, via a process of 
delegation from NHS Lanarkshire and North Lanarkshire Council, has responsibility for the planning, 
resourcing and operational delivery of all delegated health and social care within its geographical area. 
 
The main features of the governance framework are: 
 
Principles 
 The IJB follows the principles set out in the Convention of Scottish Local Authorities (COSLA) and the 
Accounts Commission in 1996 Code of Guidance on Funding External Bodies and Following the Public 
Pound for both resources delegated to the IJB, and resources paid to its Local Authority and Health 
Service partners.

Page 75

Page | 20  
 
Formal Frameworks 
 The IJB is formally constituted through the Integration Scheme agreed by North Lanarkshire Council 
and NHS Lanarkshire and approved by Scottish Ministers. 
 The IJB operates within an established procedural framework.  The roles and responsibilities of board 
members and officers are defined within standing orders, scheme of delegation and financial 
governance arrangements which are subject to regular review.  The IJB Code of Corporate Governance5 
was approved by the IJB on 18 July 2017 which is subject to ongoing updates as required.  Board 
members adhere to an established Code of Conduct and are supported by induction and ongoing 
training and development.  Staff ‘Personal Development Plan’ (PDP) schemes are also in place, the aim 
of which is to focus on performance and development that contributes towards achieving service 
objectives. 
 The HSCP has robust structures which are based on service delivery, care and interventions that are 
person centred, timely, outcome focused, equitable, safe, efficient, and effective.  Reports are 
presented to the IJB throughout the year which provides evidence to demonstrate the delivery of our 
core components within our frameworks and the Clinical and Care Governance principles specified by 
Scottish Government. 
 
Strategic Planning 
 The overarching strategic vision and objectives of the IJB are detailed in the IJB Strategic 
Commissioning Plan which sets out the key outcomes the IJB is committed to delivering with its 
partners. 
 The Strategic Planning Group sets out the IJB’s approach to engage with stakeholders.  Consultation on 
the future vision and activities of the IJB is undertaken with its Health Services and Local Authority 
partners.  The IJB regularly publishes information regarding its performance. 
 The Medium‐Term Financial Plan 2023/2026 outlines the financial challenges and opportunities the 
HSCP faces over the next three years and provides a framework which will support the HSCP to remain 
financially sustainable.  It complements the IJB Strategic Commissioning Plan 2023/2026, highlighting 
how the financial plan will support the delivery of the IJB’s strategic objectives and priorities. 
 
Oversight 
 Effective scrutiny and service improvement activities are supported by the formal submission of 
reports, findings and recommendations by Inspectorates and the appointed Internal Audit Service to 
the IJB’s Senior Management Team, the main IJB board and the Performance, Finance and Audit 
Committee, as appropriate. 
 Performance management, monitoring of service delivery and financial governance is provided by the 
HSCP to the IJB, who are accountable to both the Health Board and Local Authority.  It reviews reports 
on the effectiveness of the integrated arrangements including the financial management of the 
integrated budget.  This ensures there is a regular scrutiny at senior management, committee, and 
board level.  Information on performance can be found in the Annual Performance Report published on 
our North Lanarkshire HSCP website6. 
 
Risk Management 
 In line with the continued and ongoing review of the IJB Risk Register, new and emerging risks or 
changes in risk level are agreed at each Senior Management Team, IJB and PFA meeting as appropriate.  
The current risks at time of writing are summarised in the Management Commentary on pages 12‐13. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5 IJB Code of Corporate Governance 
6 Health & Social Care North Lanarkshire Website

Page 76

Page | 21  
 
Financial Control 
 Responsibility for maintaining and operating an effective system of internal financial control rests with 
the Chief Finance Officer.  The system of internal financial control is based on a framework of regular 
management information, Financial Regulations and Standing Financial Instructions, administrative 
procedures, including segregation of duties, and management and supervision including delegation and 
accountability.  Development and maintenance of these systems is undertaken by managers within the 
HSCP supported by North Lanarkshire Council and NHS Lanarkshire in relation to the operational 
delivery of health and social care services. 
 
Transformational Change 
 The Medium‐Term Financial Plan and the Strategic Commissioning Plan recognises the need to 
transform the way in which the HSCP delivers services to ensure the sustainability of health and social 
care services going forward.  Together with the IJB Reserves Strategy, both plans are regularly reviewed 
over their lifespan, and amended as necessary to reflect the current challenges and pressures the 
partnership face. 
 
Review of Adequacy and Effectiveness 
 Due to the nature of the IJB membership, a conflict of interest can arise between individual board and 
committee members and the responsibilities they have to the IJB.  It is the responsibility of board and 
committee members to declare any potential conflicts of interest, and it is the responsibility of the 
Chair of the relevant board or committee to ensure such declarations are appropriately considered and 
acted upon.  
 The IJB has responsibility for conducting, an annual review of the effectiveness of the system of 
internal control and the quality of data used throughout the organisation.  The review is informed by 
the work of the Senior Management Team who have the responsibility for the development and 
maintenance of the internal control framework, the work of the internal and external audit teams and 
other independent inspectorates.   
 Internal Audit undertake an annual programme following an assessment of risk completed during the 
strategic audit planning process.  The appointed Chief Internal Auditor in conjunction with the Head of 
Audit and Risk, provide an annual report to the IJB PFA giving an independent opinion of the adequacy 
and effectiveness of the governance framework, risk management and internal controls. 
 Based on the audit work undertaken directly on behalf of the IJB and being informed by internal audit, 
work undertaken independently by each respective internal audit function within North Lanarkshire 
Council and NHS Lanarkshire, the Chief Internal Auditor and Head of Audit and Risk is able to conclude 
that a reasonable level of assurance can be placed upon the adequacy and effectiveness of the IJB’s 
framework of governance, risk management and internal controls. 
 
Roles and Responsibilities 
The Chief Officer is the Accountable Officer for the IJB and has day‐to‐day operational responsibility to 
monitor delivery of integrated services, with oversight from the IJB. 
 
The IJB complies with the CIPFA statement on ‘The Role of the Chief Finance Officer in Local Government 
2014’.  The IJB Chief Finance Officer has responsibility for North Lanarkshire HSCP financial arrangements 
and is professionally qualified and suitably experienced to lead and advise the IJB finance function.

Page 77

Page | 22  
 
The IJB complies with the requirements of the Public Internal Audit Standards (PSIAS) and the approved 
Internal Audit Charter for the IJB.  The appointed IJB Chief Internal Auditor has responsibility for the IJB 
internal audit function and is professionally qualified and suitably experienced to lead and direct internal 
audit staff.  The Internal Audit service operates in accordance with the CIPFA ‘Public Sector Internal Audit 
Standards 2017’. 
 
Board members and officers of the IJB are committed to the concept of sound internal control and the 
effective delivery of health and social care services.  The IJB Performance, Finance and Audit Committee 
operates in accordance with CIPFA Audit Committee Principles in Local Authorities in Scotland and Audit 
Committees ‘Practical Guidance for Local Authorities’.  The Committee core function is to provide the IJB 
with independent assurance on the adequacy of the risk management framework, the internal control 
environment, the integrity of the financial reporting and governance arrangements. 
 
In March 2023, the IJB approved a revision to the IJB Performance, Finance and Audit Committee Terms of 
Reference, delegating the power to approve the IJB Annual Accounts effective from the financial year 
2022/2023 and each year thereafter.  The PFA Terms of Reference have been revised to account for this 
change. 
 
An update to the North Lanarkshire IJB Governance Document was approved by the IJB on 17 May 2023 
which includes IJB Programme of Reports, Equality Impact Assessment, Code of Conduct and Declaration of 
Interest, Directions, IJB Risk Reporting Process and Risk Reporting Template7. 
 
Action Plan 
To ensure continual improvement of the IJB’s governance arrangements, the following action plan has 
been agreed.  Also included are improvement areas identified by Audit Scotland within their Annual Audit 
Report.  Regular updates on progress of the agreed actions will be presented to and monitored by the IJB 
Performance, Finance and Audit Committee. 
 
2021/2022 
Ref 
Improvement Area  Agreed Action Responsible 
Person 
Date
1  Review of Set‐Aside 
Concept 
Due to the complexity of the data surrounding this area, 
it has been agreed with the partner that the current 
process will remain as described in note 2 Critical 
Judgments and Estimation Uncertainty, until a decision 
is taken at a national level. 
Chief 
Finance 
Officer 
Complete
2  Website Refresh  HSCP working group have completed the development 
of the new IJB website which reflects the current 
operating model.  There is a dedicated team who will 
take ownership and responsibility for maintaining and 
updating it.  The new website launched at the end of 
February 2023 with endorsement by the IJB on 22 
March 2023. 
IJB Chief 
Officer 
Complete
3  Medium Term Financial 
Plan 
The new Medium Term Financial Plan 2023/ 2026
reflects the impact of recovering from Covid‐19 and 
other challenging factors facing the IJB.  The plan was 
approved by the IJB on 22 March 2023 and aligns to the 
new Strategic Commissioning Plan 2023/ 2026 and the 
current IJB Reserves Strategy.  
Chief 
Finance 
Officer 
Complete
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
7 North Lanarkshire IJB Governance Document Update 2023

Page 78

Page | 23  
 
2022/2023 
Ref 
Improvement Area  Agreed Action Responsible 
Person 
Date
1  Completion of previous 
internal and external 
audit actions. 
All external and internal audit actions have been 
completed apart from the Service Level Agreement 
(SLA) with Children, Families and Justice.  This SLA will 
be revisited once further clarity has been obtained 
around what services will be part of the new National 
Care Service.  Progress was reported to the PFA 
Committee in November 2022 and April 2023. 
Chief 
Finance 
Officer 
Complete
(Pending 
National 
Care 
Service) 
2  National Care Service  To develop a sound understanding of the impact for the 
NLHSCP of the outputs of the National Care Service 
legislation.  Due to the uncertainty and lack of detail 
currently available, the revised date of completion has 
been moved to March 2024. 
Chief Officer Updated 
timescale:
March 24 
3  Implementation of 
improvement actions 
identified in the Best 
Value Self‐Assessment 
exercise. 
Both the Strategic Commissioning Plan 2023/2026 and 
the Medium‐Term Financial Plan 2023/2026, approved 
at the IJB on 22 March 2023, align to strengthen 
outcomes against resources.  By ensuring good practise 
and lessons learned, both plans have aligned to future 
funding and reserves to link with outcomes around the 
improvement actions in the Best Value Self‐Assessment 
exercise. 
Head of 
Planning, 
Performance 
and Quality 
Assurance 
Complete
4  Review the IJBs progress 
in becoming a Category 
1 Responder as set out 
within the Civil 
Contingencies Act 
In conjunction with the Local Resilience Partnership, 
undertake a self‐assessment review against the seven 
duties, reporting progress to the West of Scotland 
Regional Resilience Partnership.  Report submitted and 
reviewed by the IJB on 22 March 2023. 
Chief Officer Complete
5  Accounts Inspection The IJB should ensure it has procedures in place to 
ensure the accounts inspection advert is published in 
line with criteria set out in the Local Authority Accounts 
(Scotland) Regulations 2014. 
Chief 
Finance 
Officer 
June 2023
6  2022/23 Reserves 
Strategy 
The IJB 2022/23 Reserves Strategy was presented and 
approved by the IJB Committee on 22 March 2023.  The 
Reserves Strategy will continue to be updated in line 
with the new Strategic Commissioning Plan 2023/2026 
and the new Medium Term Financial Plan 2023/2026. 
Chief 
Finance 
Officer 
Complete
7  Review of Financial 
Regulations  
Revised Financial Regulations were approved at the 
Performance, Finance and Audit Committee on 15 
February 2023 and include the services currently 
delegated by each partner to the IJB and the principal 
method of accounting for Hosted Services. 
Chief 
Finance 
Officer  
Complete
 
Internal Audit Opinion 
Internal control remains, primarily, a management responsibility to ensure that the partnership conducts 
its business in a manner that has due regard to the principles of good governance.  Overall, the results of 
the work undertaken by Internal Audit including reports produced by External Audit, help to inform an 
opinion on whether the internal controls the North Lanarkshire HSCP has in place are adequate.  The joint 
internal audit opinion is that reasonable assurance can be placed upon the adequacy and effectiveness of 
the North Lanarkshire IJB’s framework of governance, risk management and internal control.

Page 79

Page | 24  
 
Conclusion and Opinion on Assurance 
It is our opinion that reasonable assurance can be placed upon the adequacy and effectiveness of the IJB’s 
governance arrangements.  The IJB has adhered to the stated principles of good governance, acted in the 
public interest, and been committed to continuous improvement.  The scrutiny and oversight of the IJB 
Performance, Finance and Audit Committee contributes effectively to these arrangements.  There were no 
significant control weaknesses, issues, or failures in the expected standards for good governance, risk 
management and internal control.   
 
We consider that the internal control environment provides reasonable and objective assurance that any 
significant risks impacting on the IJB’s principal objectives will be identified and actions taken to avoid or 
mitigate their impact and are consistent with the recommendations of the CIPFA/SOLACE Framework 
(2016). 
 
 
 
 
Councillor Ayeshah Khan 
Chair, North Lanarkshire Integration Joint Board 
Date:   
 
 
 
 
Ross McGuffie 
Chief Officer 
Date:

Page 80

Page | 25  
 
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT 
FOR THE YEAR ENDED 31 MARCH 2023 
 
This statement shows the actual cost of providing services in accordance with generally accepted 
accounting practices.  It includes, on an accrual basis, all expenses and related income. 
 
 
 
There are no statutory or presentation adjustments which affect the IJB’s application of the funding 
received from partners. 
 
The movement in the General Fund balance is therefore solely due to the transactions shown in the 
Comprehensive Income and Expenditure Statement.  Consequently, an Expenditure and Funding Analysis is 
not provided in these annual accounts.   
 
 
 
 
 
 
 
 
Gross 
Expenditure
Gross 
Income
Net 
Expenditure
Gross 
Expenditure
Gross 
Income
Net 
Expenditure
£m £m £m £m £m £m
202.610 (1.593) 201.017 Social Care Services 236.972 (2.280) 234.692
74.073 74.073 Health Care Services 74.527 74.527
109.652 109.652 Family Health Services 115.625 115.625
149.126 149.126 Hosted Services 11 159.642 159.642
1.668 (1.668) 0.000 Housing Services 1.886 (1.886) 0.000
0.539 (0.539) 0.000 Transport Services 0.551 (0.551) 0.000
0.214 0.214 Corporate Services 6 0.247 0.247
68.739 68.739 Prescribing  71.332 71.332
65.164 65.164 Set Aside for Hospital Acute 
Services 69.120 69.120
13.412 13.412 Covid‐19 Costs 10 7.072 7.072
685.197 (3.800) 681.397 Total Cost of Services 736.974 (4.717) 732.256
(702.633) (702.633) Taxation and Non‐Specific Grant 
Income 5 (709.408) (709.408)
(45.098) (45.098) Covid‐19 Funding 10 (1.342) (1.342)
685.197 (751.531) (66.334)
(Surplus) or Deficit on 
Provisions of Services 
(Movement in Reserves)
736.974 (715.467) 21.506
2021/2022 2022/2023
North Lanarkshire Health & 
Social Care Partnership 
Integration Joint Board
Note

Page 81

Page | 26  
 
MOVEMENT IN RESERVES STATEMENT 
 
This statement shows the movement in the year on the IJB’s reserves.  The movements which arise due to 
statutory adjustments which affect the General Fund balance are separately identified from the 
movements due to accounting practices. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
General Fund     
Balance Total Reserves
£m £m
Opening Balance at 1 April 2021 (53.118) (53.118)
Total Comprehensive Income and Expendiutre   
(Increase) or decrease in 2021/22 (66.334) (66.334)
Closing Balance at 31 March 2022 (119.452) (119.452)
Opening Balance at 1 April 2022 (119.452) (119.452)
Total Comprehensive Income and Expendiutre   
(Increase) or decrease in 2022/23 21.506 21.506
Closing Balance at 31 March 2023 (97.946) (97.946)
Movement in Reserves during 2021/2022:
Movement in Reserves during 2022/2023:
North Lanarkshire Health & Social Care 
Partnership Integration Joint Board

Page 82

Page | 27  
 
BALANCE SHEET AS AT 31 MARCH 2023 
 
The balance sheet shows the value of the IJB’s assets and liabilities as at 31 March 2023.  The net assets of 
the IJB (assets less liabilities) are matched by the reserves held by the IJB. 
 
 
 
The Statement of Accounts presents a true and fair view of the financial position of the North Lanarkshire 
Integration Joint Board as at 31 March 2023 and its income and expenditure for the year then ended. 
 
The unaudited accounts were authorised for issue on 21 June 2023.   
 
Balance Sheet signed by: 
 
 
 
 
Amanda Kilburn FCCA 
Chief Finance Officer 
Date:  21 June 2023 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
31 March 
2022
31 March 
2023
£m £m
119.452 Current Assets                           
Short Term Debtors 7 97.946
‐ Current Liabilities                        
Short Term Creditors 7 ‐
119.452 Net Assets 97.946
119.452 Usable Reserves: General Fund 8 97.946
119.452 Total Reserves 97.946
North Lanarkshire Health & Social Care 
Partnership Integration Joint Board Notes

Page 83

Page | 28  
 
NOTES TO THE FINANCIAL STATEMENTS 
 
Note 1.  Significant Accounting Policies 
 
General Principles 
The financial statements summarise the transactions of the IJB for the financial year 2022/2023 and its 
position at 31 March 2023. 
 
The IJB was established under the requirements of the Public Bodies (Joint Working) (Scotland) Act 2014 
and is a Section 106 body as defined in the Local Government (Scotland) Act 1973.  It is a joint venture 
between North Lanarkshire Council and NHS Lanarkshire. 
 
The financial statements are therefore prepared in compliance with the Code of Practice on Local Authority 
Accounting in the United Kingdom 2022/2023, supported by the International Financial Reporting 
Standards (IFRS), unless legislation or statutory guidance requires different treatment.  Each partner 
complies with their accounting policies as appropriate.  
 
The accounts are prepared on a going concern basis, which assumes that the IJB will continue in 
operational existence for the foreseeable future.  The historical cost convention has been adopted. 
 
Accruals of Income and Expenditure 
Activity is accounted for in the year that it takes place, not simply when settlement in cash occurs.  In 
particular: 
 
 Expenditure is recognised when goods or services are received, and their benefits are used by the IJB. 
 Income is recognised when the IJB has a right to the income, for instance, by meeting any terms and 
conditions required to earn the income and receipt of the income is probable. 
 Where income and expenditure have been recognised but settlement in cash has not taken place, a 
debtor or creditor is recorded in the balance sheet. 
 Where debts may not be received, the balance of debtors is written down. 
 
Funding 
The IJB is primarily funded through funding contributions from its statutory funding partners, North 
Lanarkshire Council and NHS Lanarkshire.  Expenditure is incurred as the IJB commissions specified health 
and social care services from the funding partners for the benefit of service recipients in North Lanarkshire 
and service recipients in South Lanarkshire, for services that are delivered under hosted arrangements. 
 
Cash and Cash Equivalents 
The IJB does not operate a bank account or hold cash.  All transactions are settled on behalf of the IJB by 
the funding partners.  Consequently, the IJB does not present a ‘Cash and Cash Equivalent’ figure on the 
balance sheet.   
 
There is therefore no requirement for the IJB to produce a cash flow statement.  The funding balance due 
to or from each funding partner as at 31 March 2023 is represented as a debtor or creditor on the IJB’s 
balance sheet.

Page 84

Page | 29  
 
Employee Benefit 
The IJB does not directly employ staff.  Staff are formally employed by the funding partners who retain the 
liability for pension benefits payable in the future.  The IJB therefore does not present a Pensions Liability 
on its balance sheet. 
 
The IJB has a legal responsibility to appoint a Chief Officer.  A Chief Finance Officer has also been appointed 
to the IJB.  More details on these arrangements are provided in the remuneration report.  The charges for 
the employing partners are treated as employee costs.  Where material, the absence entitlement at 31 
March is accrued, for example in relation to annual leave earned but not yet taken.  In the case of North 
Lanarkshire IJB any annual leave earned by the Chief Officer and Chief Finance Officer, but not yet taken is 
not considered to be material. 
 
Provisions, Contingent Liabilities and Contingent Assets 
Provisions are liabilities of uncertain timing or amount.  A provision is recognised as a liability on the 
balance sheet when there is an obligation on 31 March due to a past event, settlement of the obligation is 
probable, and a reliable estimate of the amount can be made.  Recognition of a provision will result in 
expenditure being charged to the Comprehensive Income and Expenditure Statement and will normally be 
a charge to the General Fund. 
 
A contingent liability is a possible liability arising from events on or before 31 March, whose existence will 
only be confirmed by later events.  A provision that cannot be reasonably estimated, or where settlement 
is not probable, is treated as a contingent liability.  A contingent liability is not recognised in the IJB’s 
balance sheet but is disclosed in a note where it is material. 
 
A contingent asset is a possible asset arising from events on or before 31 March, whose existence will only 
be confirmed by later events.  A contingent asset is not recognised in the IJB’s balance sheet but is 
disclosed in a note only if it is probable to arise and can be reliably measured. 
 
Indemnity Insurance / Clinical and Medical Negligence 
The IJB has indemnity insurance for costs relating primarily to potential claim liabilities regarding board 
member and officer responsibilities through the Clinical Negligence and Other Risks Indemnity Scheme 
(CNORIS).  North Lanarkshire Council and NHS Lanarkshire have responsibility for claims in respect of the 
services for which they are statutorily responsible for and that they provide. 
 
Unlike NHS Boards, the IJB does not have any ‘shared risk’ exposure from participation in CNORIS.  The IJB 
participation in the scheme is therefore analogous to normal insurance arrangements. 
 
Known claims are assessed as to the value and probability of settlement.  Where it is material, the overall 
expected value of known claims taking probability of settlement into consideration, is provided for in the 
IJB balance sheet. 
 
The likelihood of receipt of an insurance settlement to cover any claims is separately assessed and where 
material, presented as either a debtor or disclosed as a contingent asset. 
 
Debtors and Creditors 
Financial instruments are recognised in the balance sheet when an obligation is identified and released as 
that obligation is fulfilled.  Debtors are held at fair value and represent funding due from partner bodies 
that was not utilised in year.  There are no creditor balances.

Page 85

Page | 30  
 
Reserves 
A reserve is the accumulation of surpluses, deficits, and appropriation over a number of years.  Reserves of 
a revenue nature are available and can be spent or earmarked at the discretion of the IJB.  Reserves should 
be split between usable and unusable on the balance sheet.  As at 31 March 2023, the usable reserve 
balance totals £97.946m.  There are no unusable reserves. 
 
Specific Service Income 
Income may be received from individuals as a contribution towards the cost of their social care service.  
The amount collected is allocated to the relevant expenditure category and the net cost is reported in the 
Comprehensive Income and Expenditure Statement.  This is the basis upon which the 2022/2023 annual 
accounts have been prepared. 
 
Note 2.  Critical Judgements and Estimation Uncertainty 
In preparing the 2022/2023 financial statements, the IJB has had to make certain judgements about 
complex transactions or those involving uncertainty about future events.  The critical judgments made in 
the annual accounts are: 
 
 Hosted Services 
Within Lanarkshire, each IJB has operational responsibility for the services which it hosts on behalf of the 
other IJB.  In delivering these services each IJB has primary responsibility for the provision of the services 
and bears the risk and reward associated with this service delivery in terms of demand and the financial 
resources required.  As such the IJB is considered to be acting as ‘principle’, and the full costs are reflected 
within the annual accounts for the services which it hosts.  This is the basis on which North Lanarkshire IJB 
accounts have been prepared. 
 
 Hospital Acute Services (Set‐Aside) 
The legislation sets out that Integration Authorities are responsible for the strategic planning of hospital 
services most commonly associated with the emergency care pathway along with primary and community 
health care and social care services.  As the emergency care services in large hospitals, both within 
Lanarkshire and out of region, are used by the residents of multiple IJBs and are delivered using resources 
shared with other hospital services, estimating the resource used by each IJB each year involves a complex 
allocation methodology.   
 
This is enabled by NHS Public Health Scotland (PHS) and involves apportioning the hospital expenditure to 
individual patient episodes, separating out episodes for services delegated to the IJB from those that are 
not, and assigning these to the relevant IJB based on postcode.  The complexity of this exercise means the 
results are produced at a time lag of over a year. 
 
Note 3.  Events After the Balance Sheet Date 
The Chief Finance Officer authorised the unaudited annual accounts for issue on 21 June 2023.  Events 
after the balance sheet date are those events that occur between the end of the reporting period and the 
date when the statements are authorised for issue. 
 
Where events take place before the date of authorisation and provide information about conditions 
existing as at 31 March 2023, the figures in the financial statements and notes would be adjusted in all 
material aspects to reflect the impact of this information.  There have been no material events since the 
date of the balance sheet which require revision to the figures in the annual accounts.

Page 86

Page | 31  
 
Note 4.  Expenditure and Income Analysis by Nature 
The following table shows the gross expenditure and income for North Lanarkshire IJB against subjective 
headings: 
 
 
 
Note 5.  Taxation and Non‐Specific Grant Income 
The following table shows the funding contribution from the two partner organisations: 
 
 
 
The funding contribution from the NHS Board shown above includes £69.120m in respect of ‘Set Aside’ 
resources relating to acute hospital services.  These are provided by NHS Lanarkshire which retains 
responsibility for managing the costs of providing these services.  The IJB however has responsibility for the 
consumption and level of demand placed on these resources. 
 
Excluded from the funding contribution from the partners above is any specific service income 
contributions from clients towards the cost of their social care services.  In 2022/2023 this income totalled 
£2.280m and is presented as gross income in the Cost of Services within the Comprehensive Income and 
Expenditure Statement on page 25. 
 
 
 
 
2021/2022 2022/2023
£m £m
Social Care Services 202.610 236.972
Health Care Services ‐ Localities 58.073 58.422
Health Care Services ‐ Area Wide 11.010 11.189
Health Care Services ‐ Out of Area 4.990 4.917
Family Health Services 109.652 115.625
Housing Services 1.668 1.886
Transport Services 0.539 0.551
Hosted Services ‐ Led by North IJB 114.573 125.402
Hosted Services ‐ Led by South IJB 34.553 34.240
IJB Operating Costs 0.214 0.247
Prescribing Costs 68.739 71.332
Covid‐19 Costs 13.412 7.072
Set Aside 65.164 69.120
Income (3.800) (4.717)
Total Cost of Services 681.397 732.256
Partners Funding Contributions and Non‐Specific Grant Income (702.633) (709.408)
Covid‐19 Funding (45.098) (1.342)
(Surplus)/Deficit on Provision of Services (66.334) 21.506
Expenditure and Income Analysis by Nature
2021/2022 2022/2023
£m £m
Funding Contribution from NHS Lanarkshire (537.845) (523.649)
Funding Contribution from North Lanarkshire Council (164.788) (185.759)
Total (702.633) (709.408)
Taxation and Non‐Specific Grant Income

Page 87

Page | 32  
 
Note 6.  IJB Operating Costs 
North Lanarkshire Council and NHS Lanarkshire provide a range of support services for the IJB including 
finance, personnel, planning, audit, payroll, debtor, and creditor services.  There is no charge to the IJB for 
these support services.   
 
The costs associated with running the IJB are shown in the following table: 
 
 
 
Note 7.  Short Term Debtors and Creditors 
At 31 March 2023, North Lanarkshire IJB had short term debtors of £97.946m relating to the reserves held 
in the Balance Sheet.  There were no short‐term creditors.  Amounts owed by funding partners are stated 
on a net basis and are classified as short‐term debtors on the basis that these reserves could be utilised at 
any time. 
 
 
Note 8.  Usable Reserves: General Fund 
The purposes of the General Fund are detailed in the IJB Reserves Policy8 and summarised below: 
 
 Funding received for a specific purpose and not yet spent will be allocated to a ring‐fences reserve.   
 Funding for future expenditure needs and key financial risks will be allocated to earmarked reserves.   
 A contingency reserve is required to cushion the impact of unexpected events or emergencies. 
 
At 31 March 2023 the IJB created earmarked reserves to support the delivery of projects which span 
financial years and ring‐fenced reserves to enable the IJB to deliver on specific Scottish Government 
funded programmes.  In addition, the contingency reserve has been increased as part of the financial 
strategy of the IJB.  This will be used to manage the risk of any future unanticipated events and support 
service provision that may materially impact on the financial position of the IJB in later years. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
8 IJB Reserves Policy 
2021/2022 2022/2023
£m £m
Staff Costs 0.183 0.213
Audit Fees 0.028 0.031
Administration Costs 0.003 0.003
Total 0.214 0.247
IJB Operating Costs                      
(Corporate Services)
2021/2022 2022/2023
£m £m
NHS Lanarkshire 87.533 62.180
North Lanarkshire Council 31.919 35.766
Total 119.452 97.946
2021/2022 2022/2023
£m £m
NHS Lanarkshire ‐ ‐
North Lanarkshire Council ‐ ‐
Total ‐ ‐
Short Term Debtors
Short Term Creditors

Page 88

Page | 33  
 
The following table shows how reserves are allocated: 
 
 
 
Note 9.  Related Party Transactions 
The IJB has related party transactions with North Lanarkshire Council and NHS Lanarkshire.  In particular 
the nature of the partnership means that the IJB may influence and be influenced by its partners. 
 
Non‐voting board members are not directly employed by NHS Lanarkshire however, a contribution of 50% 
of the cost of the Chief Officer is made by NHS Lanarkshire along with the full cost of the Chief Finance 
Officer.  This payment is included in the IJB Operating Costs (Corporate Services) in the Comprehensive 
Income and Expenditure Statement and detailed at Note 6. 
 
The financial information contained in the IJB annual accounts excludes any values associated with 
transactions between each of the partners.  This has been removed to prevent double counting. 
 
 
 
Scottish Government Ring‐Fenced Reserves £m £m
Alcohol and Drug Partnership Funding 1.187 3.348
Blood‐Borne Viruses Services ‐ 0.171
Children and Adolescent Mental Health Services 0.900 4.101
Community Living Change Fund 1.298 1.298
Covid‐19 Funding 31.686 0.771
District Nursing ‐ Scottish Government Funded 0.128 0.376
Hospital at Home Services ‐ Support Development ‐ 0.621
Mental Health and Learning Disability Services  0.730 11.290
North Planning Band 2‐4 Posts & Pharmacy Training ‐ 1.106
Ring‐Fenced Reserves ‐ Other Services 1.748 4.495
Scottish Government Ring‐Fenced Reserves Total 37.677 27.577
Earmarked Reserves £m £m
Adult Social Care Winter Preparedness Fund 1.941 1.941
Carers Act Support 0.580 2.643
Children and Adolescent Mental Health Services 0.717 0.346
Digital and IT Strategy 0.566 5.630
Earmarked Reserves ‐ Other Services 46.481 5.263
Home Support Resilience 0.217 3.498
Integrated Authority Support 6.076 4.926
IJB Financial Plan 2023/2026 6.818 8.947
Minor Repair and Replacement Programme of Works 1.387 3.390
Social Care Services 4.832 5.216
Speech, Language and Therapy Services 0.807 ‐
Winter Funding Business Case 0.308 5.608
Earmarked Reserves Total 70.730 47.408
Contingency Reserve Total 11.045 22.961
Total North Lanarkshire IJB Reserves 119.452 97.946
USEABLE RESERVES 2021/2022 2022/2023

Page 89

Page | 34  
 
The following transactions and balances included in the IJB annual accounts are presented to provide 
additional information on related party relationships. 
 
 
 
Note 10.  Covid‐19 Costs and Funding 
The following table shows how additional funding provided by Scottish Government in response to 
supporting the remobilisation of services and continuing Covid‐19 pressures has been utilised in 
2022/2023.  The remaining balance of £7k will be carried forward into 2023/2024 to provide PPE to unpaid 
carers:  
 
 
*Uncommitted Covid‐19 funding totalling £25.916m has been returned to Scottish Government via a local 
transfer between North Lanarkshire IJB and NHS Lanarkshire. 
 
2021/2022 2022/2023
£m £m
NHS Lanarkshire ‐
North Lanarkshire Council (3.800) (4.717)
Total (3.800) (4.717)
2021/2022 2022/2023
£m £m
NHS Lanarkshire 472.132 496.010
North Lanarkshire Council 213.065 240.964
Total 685.197 736.974
2021/2022 2022/2023
£m £m
NHS Lanarkshire (537.845) (523.649)
North Lanarkshire Council (164.788) (185.759)
Covid‐19 Funding (45.098) (1.342)
Total (747.731) (710.750)
2021/2022 2022/2023
£m £m
NHS Lanarkshire 87.533 62.180
North Lanarkshire Council 31.919 35.766
Total 119.452 97.946
Income Received
Expenditure on Services Provided
Funding Contributions Received
Debtors
NHS Lanarkshire Funding (31.686)
North Lanarkshire Council Funding (1.342)
Uncommitted Funding Returned to Scottish Government* 25.916
Adjustment to Covid‐19 Reserve 0.033
NHS Lanarkshire Costs 5.730
North Lanarkshire Council Costs 1.342
Total Covid‐19 Costs 2022/2023 7.072
Balance as at 31/03/2023 (0.007)
£mDescription 2022/2023

Page 90

Page | 35  
 
Note 11.  Hosted Services 
North Lanarkshire IJB act as the lead for a number of delegated services on behalf of South Lanarkshire IJB.  
It therefore commissions services on behalf of South Lanarkshire IJB and reclaims the costs involved.  Since 
North Lanarkshire IJB is acting as ‘principle’ in these transactions, the total gross expenditure and the 
consequential reimbursement is included in the Comprehensive Income and Expenditure Statement even 
though 49% of the hosted budget is consumed by South Lanarkshire.   
 
 
 
Similarly, South Lanarkshire IJB acts as the lead for a number of delegated services on behalf of North 
Lanarkshire IJB.  The value consumed by North Lanarkshire equates to 51% of South Lanarkshire IJB hosted 
budget.  As this expenditure is incurred for the residents of North Lanarkshire, it is included in the 
Comprehensive Income and Expenditure Statement.   
 
 
North Lanarkshire 
Services 
2021/2022        
Consumed by 
South Lanarkshire 
2021/2022
North Lanarkshire 
Services 
2022/2023        
Consumed by 
South Lanarkshire 
2022/2023
£m £m £m £m
1.364 0.739 Blood Borne Virus Services 1.535 0.764
7.157 6.097 Children and Adolescents Mental Health Services 11.127 7.193
11.513 5.619 Childrens Services 12.220 6.035
2.216 1.099 Continence Services 2.452 1.177
3.519 1.864 Dietetics Services 3.753 1.996
2.178 1.264 Hospital at Home 2.166 1.277
3.564 1.077 Immunisation Services 2.473 0.940
‐ 0.278 Integrated Equipment and Adaptation Store ‐ 0.278
68.844 38.312 Mental Health and Learning Disability Services 74.366 41.490
4.045 2.118 Podiatry Services 4.434 2.250
1.724 0.984 Prisoner Healthcare Services 1.908 0.874
2.809 1.442 Sexual Health Services 2.974 1.541
5.640 2.962 Speech and Language Therapy Services 5.994 3.195
114.573 63.855 Total Services Hosted by North Lanarkshire IJB 125.402 69.010
Host: North Lanarkshire
Service 
Consumed by    
North Lanarkshire 
2021/2022
South Lanarkshire 
Services 
2021/2022        
Consumed by    
North Lanarkshire 
2022/2023
South Lanarkshire 
Services 
2022/2023     
£m £m £m £m
3.758 6.508 Community Dental Services 4.007 7.081
‐ ‐ Brain Injury Unit 1.396 1.856
2.929 3.960 Diabetic Services 2.649 5.113
‐ ‐ Improving Cancer Journey 0.024 0.047
5.180 9.057 Occupational Therapy Services 4.350 7.909
4.509 8.126 Out of Hours Services 4.806 9.003
3.770 7.541 Palliative Care Services 3.738 7.412
5.148 9.632 Physiotherapy Services 5.536 10.427
‐ ‐ Telehealth 0.362 0.319
0.389 0.657 Primary Care Services 0.452 0.810
8.656 7.177 Primary Care Improvement Fund 6.920 10.973
0.214 0.420 Primary Care Transformation Fund ‐ ‐
34.553 53.078 Total Services Hosted by South Lanarkshire IJB 34.240 60.950
Host: South Lanarkshire
Service

Page 91

Page | 36  
 
The table below shows the total of hosted services included in the Comprehensive Income and Expenditure 
Statement: 
 
2021/2022 
£m 
Hosted Services 
  2022/2023
£m 
114.573  Total Services Hosted by North Lanarkshire IJB  125.402
34.553  Total Services Hosted by South Lanarkshire IJB  34.240
149.126  Total Included in Comprehensive Income and Expenditure Statement  159.642
 
Note 12.  Additional Council Services Delegated to the IJB 
The following table shows the costs of North Lanarkshire Council services delegated to the IJB.  Under the 
Public Bodies (Joint Working) (Scotland) Act 2014, the IJB is accountable for these services however, they 
continue to be delivered by North Lanarkshire Council.  HSCP monitor the delivery of these services on 
behalf of the IJB.             
 
Note 13.  VAT 
The IJB is not VAT registered and does not charge or recover VAT on its functions. 
 
The VAT treatment of expenditure and income within the accounts depends on which of the partner is 
providing the service as these bodies are treated differently for VAT purposes: 
 
 Where North Lanarkshire Council is the provider, income and expenditure exclude any amounts 
related to VAT, as collected VAT is payable to HM Revenue & Customs and all VAT paid is 
recoverable from it.  On a very limited number of items that North Lanarkshire Council are not 
entitled to fully recover VAT, expenditure for these specific items will include the full cost to the IJB. 
 
 Where NHS Lanarkshire is the provider, expenditure will include the full cost to the IJB as generally, 
NHS Lanarkshire cannot recover VAT. 
 
The services provided by the Chief Officer to the IJB are outside the scope of VAT as they are undertaken 
under a specific legal regime. 
 
Note 14.  External Audit Costs 
Fees payable to Audit Scotland in respect of external audit services undertaken in accordance with Audit 
Scotland’s Code of Audit Practice in 2022/23 are £31,470.  Audit Scotland did not undertake any non‐audit 
services. 
 
Note 15.  New Standard Issued but Not Yet Adopted 
The Code requires the disclosure of information relating to the impact of an accounting change that will be 
required by a new standard that has been issued but not yet adopted.  The IJB considers that there are no 
such standards which would have significant impact on its annual accounts. 
2021/2022 2022/2023
£m £m
1.668 Housing Services 1.886
0.539 Transport Services 0.551
2.207 Gross Expenditure 2.437
(2.207) Income (2.437)
‐ Net Expenditure ‐
Council Services

Page 92

REPORT
Item No: 7
1. PURPOSE OF REPORT
1.1 This paper is coming to the Performance, Finance and Audit (PFA) Committee:
For approval For endorsement For noting
1.2 This report provides an update on the results of the planned Internal Audit
assignment to follow-up the status of the recommendations agreed in respect of
previous internal and external audit reports.
2. ROUTE TO THE PERFORMANCE, FINANCE AND AUDIT COMMITTEE
2.1 This paper has been:
Prepared By: Audit Team,
North Lanarkshire Council
☒ Reviewed By: Chief
Finance Officer
☒ Endorsed By:
Chief Officer
☒
3. RECOMMENDATIONS
3.1  It is recommended that the PFA Committee:
(1) Acknowledge the contents of the report.
4. VARIATIONS TO DIRECTIONS
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 This report presents the results of the recently completed internal audit work
undertaken by North Lanarkshire Council (NLC) and to provide an update on the
results of follow-up work which reviewed the extent to which management have
implemented those actions previously committed to in response to
recommendations contained in previous internal and external audit reports.
5.2 The lead for this audit was the Audit and Risk Manager for NLC.  The completed
audit report is attached as an appendix.
6. CONCLUSIONS
6.1 The outcome of the follow-up audit concluded the following:
 19 agreed actions have been completed.
 8 agreed actions are partially implemented (4 of these actions being the same
risk)
 1 agreed action is not yet due.
 3 agreed actions are no longer relevant.
SUBJECT: Internal Audit Report – Follow-up Actions
TO: Performance, Finance and Audit Committee
Lead Officer for Report: Ross McGuffie, Chief Officer
Author(s) of Report Amanda Kilburn, Chief Financial Officer 
DATE: 21 June 2023
Yes No N/A
1

Page 93

6.2 Internal Audit concluded that management have taken significant action to
appropriately address most of the weaknesses/improvement areas in audit
outputs. 
6.3 Where Internal Audit consider the actions taken by management are only partially
implemented, an action plan has been agreed and is included in the attached
report.  These actions will be monitored in a report on agreed actions with
progress reported to the PFA Committee throughout the year. 
7.  IMPLICATIONS
7.1 NATIONAL OUTCOMES  
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonably practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care, and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
7.2 ASSOCIATED MEASURE(S) 
None. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
The strategic financial risks detailed in the IJB Risk Register has been updated
where necessary and are included in a separate report to the IJB. 
Relevant Risk Register Details  Current Risk Level Risk Owner 
7.5 ENGAGEMENT & PARTICIPATION 
Please tick the engagement and participation objectives that link(s) with this piece
of work and provide further details on the engagement and participation that was
undertaken. 
2

Page 94

Objectives  Further details 
☒ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
☒ Provide stakeholders with information on
how to get involved
☐ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☒ Measure how well we involve community
stakeholders in the planning, design, and
delivery of our services 
☒ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
☒ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff
☐ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
7.6  INEQUALITIES & FAIRER SCOTLAND DUTY
Equality and Diversity Impact Assessment Completed & Fairer Scotland Impact
Assessment Form Completed and EQIA added to website:
Yes No N/A
8. BACKGROUND PAPERS
None.
9. APPENDICES
Appendix 1 – Internal Audit Report – Follow-Up Actions
Chief Finance Officer  
Members seeking further information about any aspect of this report, please contact
Amanda Kilburn on telephone number 07816 126362. 
3

Page 95

Https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Recurring/IJB/2022-23/0500_2023_003 IJB Follow Up/A - Findings and Reporting/A04a 20230606 IJB
Follow-Up Final Report v1.0 as issued.docx 1
INTERNAL AUDIT REPORT
FOLLOW-UP OF ACTIONS PREVIOUSLY AGREED BY
MANAGEMENT IN RESPONSE TO AUDIT RECOMMENDATIONS
Contents
1. Work undertaken 2. Summary of progress made on previous recommendations
Appendix 1: Management actions assessed as ‘not yet complete’
Appendix 2: Residual risk rating definition
Issued to:  Chief Officer (North Lanarkshire HSCP) Copied to:  Chief Finance Officer
Headlines
The purpose of this report is to update the Integrated Joint Board (IJB) on the results of Internal Audit’s
follow-up work which reviewed the extent to which management have implemented those actions previously
committed to in response to recommendations contained in previous Internal and External Audit reports.
Information is contained in respect of the last three years External Audit Annual Reports and those actions
agreed in response to ‘Red’ and ‘Amber’ Internal Audit recommendations from reports issued.  We have also
included an assessment of the current position in respect of improvement actions identified by management
in the last three years’ Annual Governance Statements (AGS). 
The status of each agreed action is based on the position as at the time of audit fieldwork which was
undertaken in February and March 2023.  An update on progress to date regarding the agreed actions was
reported to the Performance, Finance and Audit Committee on 19 April 2023, thereafter reviewed by Internal
Audit and our assessment of progress updated accordingly.  
Overall, we have assessed that 19 of the 31 agreed actions have been completed, nine are partially
implemented, two are no longer relevant and one where the agreed target timescales are not yet due.  One
of the actions categorised as being no longer relevant relates to an action in a previous year’s AGS and has
been superseded by a similar action in the most recent AGS (2021/22).  The other action categorised as no
longer relevant relates to action previously included in the AGS which related to the South Lanarkshire IJB
as opposed to that of North Lanarkshire. 
We were pleased to note that management have taken significant action to appropriately address most of the
weaknesses/improvement areas in audit outputs.  Of the nine actions assessed as partially implemented, four
relate to the finalisation of the Service Level Agreement for Children, Families and Justice Services and one
relates to the National Care Service proposals.  Progression of each of these has been hindered by the
uncertainties and delays around the development of the National Care Service proposals and the impacts
that may arise as a result.
A summary of progress made on previous recommendations is contained at Section 2 of this report.  
Appendix 1 provides full details of the management actions assessed as ‘not yet complete’.
Report status FINAL Audit Ref 0500/2023/003 Date issued 06/06/2023
Audit Team Lynn McCrum and Paula Hendry
4
Appendix 1

Page 96

Https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Recurring/IJB/2022-23/0500_2023_003 IJB Follow Up/A - Findings and Reporting/A04a 20230606 IJB
Follow-Up Final Report v1.0 as issued.docx 2 
1.  Work undertaken
All Internal and External Audit reports contain management responses to audit recommendations which
generally include a commitment to specific actions by a stated timescale.  The purpose of this report is to update
the IJB on the results of Internal Audit’s follow-up work reviewing the extent to which management have
implemented those actions previously committed to in response to audit recommendations.
Information is contained in respect of the 2019-20, 2020-21 and 2021-22 External Audit Annual Reports and
the three Internal Audit reports, with recommendations, issued during 2018-19 and 2019-20.  We have also
included an assessment of the current position in respect of continuous improvement actions identified by
management in the 2019-20, 2020-21 and 2021-22 Annual Governance Statements (AGS) and in the self-
evaluation of the North Lanarkshire Health and Social Care Integration Joint Board exercise undertaken in
2021/22. 
The internal audit reports included within this review are:
• Risk maturity assessment (issued August 2019); 
• Performance management (issued August 2019); and
• Due Diligence (issued May 2020).
The status of each agreed action is based on the position as at the time of audit fieldwork which was conducted
during February and March 2023.  An update on progress to date regarding the agreed actions was reported
to the Performance, Finance and Audit Committee on 19 April 2023 and thereafter reviewed by Internal Audit
and our assessment of progress updated accordingly.  The updates on progress to date have been verified on
a sample basis by Internal Audit during the preparation of this report.  However, it should be noted that this
review has focussed on whether planned actions have been completed as previously committed to and has
not included detailed testing of whether the implemented actions have been effective in addressing the previous
identified weaknesses.
This engagement has been conducted by the Internal Audit team at North Lanarkshire Council in accordance
with the ‘Public Sector Internal Audit Standards’.  The Internal Audit section periodically reports formally on
conformance with these standards to the Council’s Audit and Scrutiny Panel. 
2.  Summary of progress made on previous recommendations
2.1 Table 1 below shows whether management have implemented those actions previously agreed to in
response to External Audit recommendations, ‘Red’ and ‘Amber’ Internal Audit recommendations and
continuous improvement actions identified by management in the Annual Governance Statements and
the self-evaluation exercise undertaken in 2021/22.  Overall, 19 of the agreed actions have been
completed, eight are partially implemented, three are no longer relevant and the target timescale for
the remaining action has not yet passed.
Table 1
Source Report Complete Partially
implemented
Not yet
due
No longer
relevant Total
Internal Audit 3 5 0 0 8
External Audit 6 1 1 0 8
Actions in AGS 7 2 0 3 12
Self-evaluation exercise 3 0 0 0 3
TOTAL 19 8 1 3 31
2.2 Internal Audit has reviewed the management progress updates as reported to the Performance,
Finance and Audit Committee in April 2023 and the revised implementation dates for all nine
recommendations which are partially implemented as listed in Table 1 above.  Internal Audit then
assessed the significance of non-implementation for recommendations which were not fully
implemented to determine the residual risk remaining in relation to the outstanding aspects of the
original recommendation.  Definitions of the residual risk ratings are provided at Appendix 2.
2.3 Detail in respect of each of these recommendations and the current residual risk assessed by Internal
Audit is provided in Appendix 1.  In this appendix, we have also made suggestions as to how the Board
may wish to consider these issues. 
5

Page 97

Https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Recurring/IJB/2022-23/0500_2023_003 IJB Follow Up/A - Findings and Reporting/A04a 20230606 IJB Follow-Up Final Report v1.0 as issued.docx 3
Appendix 1  Management actions assessed as ‘not yet complete’ 
Report Details Details from original
recommendation
Current position per management
update
Original and revised
timescales Internal Audit comment
INTERNAL AUDIT
Financial due diligence
(May 2020) – 2 actions 
EXTERNAL AUDIT
Annual Audit Report
2019/20 – 1 action 
ANNUAL GOVERNANCE
STATEMENT 
Continuous improvement
actions for 2019/20 – 1
action
Risk: A lack of formally
documented arrangements
may increase the risk that the
resources transferred from
the IJB to the Council do not
reflect the cost of the relevant
services in terms of
delegated and non-delegated
functions.
Recommendation:  Each of
the reports listed contained
similar recommendations in
respect of the disaggregation
of Children, Families and
Justice Social Work Services
and need for hosting
arrangements to be finalised
for cross-cutting services. 
The budget disaggregation exercise has
been concluded and the revised IJB
direction to NLC issued in March 2021
excludes the total budget transfer in
respect of Children, Families and Justice
Services.
Management recognises that the
finalisation of the Service Level
Agreement (SLA) for future hosting
arrangements and associated budgets is
overdue.  Once finalised, the SLA will be
presented to a future meeting of the NLC
Adult Health and Social Care Committee,
the NLC Education and Families
Committee and the IJB for approval. 
The Service Level Agreement between
Children, Families and Justice Services
will be revisited once further clarity has
been obtained around what services will
be part of the new National Care Service.
Original timescale: 
March 2021 
Revised timescales: 
September 2021
June 2022
Revised timescale to be
determined once further clarity
obtained regarding National
Care Service proposals 
We are pleased to note that the budget
disaggregation exercise has been concluded.  We
acknowledge that Covid has had a significant
impact on the Health and Social Care Partnership
which has in turn impacted on the prioritisation of
resources.
In addition, we acknowledge that further clarity
around the services which will be part of the
National Care Service is required before the
Service Level Agreement between Children,
Families and Justice Services can sensibly be
finalised.
Given the delays in implementation of the
remaining actions, we assess the residual risk as
‘High’ and suggest that the Board may wish to
consider noting the progress made to date but also
request an update on this issue from relevant
senior management at the next meeting of the
Performance, Finance and Audit Committee. 
INTERNAL AUDIT
REPORT
Performance
management
(August 2019)
Risk: There is no formal
documented record or clear
rationale for the targets and
trajectories set.
Recommendation:
Management should ensure
that a formal record is
retained detailing the
rationale for, and approval of,
the targets and trajectories
set for the indicators on the
performance scorecard and
this information should be
shared with the Performance,
Finance and Audit
Committee.
Category: Amber
The Annual Performance Report
presented to the Performance, Finance
and Audit Committee in February 2022
includes details of the targets and
trajectories set for the indicators on the
performance scorecard.
There is however currently no formal
record detailing the rationale for the
targets and trajectories set for the
indicators on the performance scorecard.
The action will now be progressed with a
view to completion and reporting to the
Performance, Finance & Audit Committee
by September 2023.
Original timescale: 
October 2019 
Revised timescales: 
March 2022
September 2023
We were pleased to note that there has been some
action taken in this area and acknowledge that
implementation of the recommendation was
delayed as a result of the pandemic in the first
instance and thereafter due to the Performance
Manager post being vacant for approximately 18
months.  This post has now been filled, with the
post holder taking up their position mid-April 2023
and work is progressing to meet the revised
timescales.
Given that action is required to further improve the
control environment we assess the residual risk as
‘Medium’ and consider it important that the agreed
revised timescale of September 2023 is achieved,
We suggest that the Board may wish to consider
noting the progress made to date and to monitor
implementation going forward. 
6

Page 98

Https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Recurring/IJB/2022-23/0500_2023_003 IJB Follow Up/A - Findings and Reporting/A04a 20230606 IJB Follow-Up Final Report v1.0 as issued.docx 4
Appendix 1 (continued)  Management actions assessed as ‘not yet complete’ 
Report Details Details from original recommendation Current position per
management update
Original and revised
timescales Internal Audit comment
INTERNAL AUDIT
REPORT
Performance
management 
(August 2019)
Risk: The IJB may not provide adequate performance
information to key stakeholders to enable the, to make
informed decisions and recommend remedial actions to
address concerns arising.
The IJB Performance, Finance and Audit Committee
may not be in a position to fulfil its remit which includes
the requirement to ‘review quarterly performance and
recommend remedial action to address concerns’ and to
‘ensure effective arrangements are in place to register all
performance and operational risks’. 
Recommendation: Management should undertake a
formal review of the current arrangements for monitoring
and reporting performance to reflect on whether reports
are fit for purpose and contain relevant, comprehensive
information useful to stakeholders.  This could include
comparison with other IJB published reports. 
Particular consideration should be given to the areas
identified in the finding, i.e.:
• an overview of all indicators on the performance
scorecard including a mechanism to provide an update
on indicators previously reported but now considered
satisfactory;
• areas for improvement listed should include proposed
actions with timescales, progress with these and how
effective they are;
• greater use of benchmarking with other IJBs and trend
information; and 
• incorporating reporting by locality.
Category: Amber
Areas for improvement identified
within the performance framework are
now reported to the Performance,
Finance and Audit Committee,
together with proposed actions and
progress.  The reports do not,
however, specifically reference
timescales.
The annual performance report was
submitted to the Performance,
Finance and Audit Committee in
February 2023 together with a
performance update report which
included key performance indicators
and measures. This report
demonstrated that there has been a
greater use of benchmarking with
other IJBs and trend information. 
In August 2022, the IJB’s
Performance, Audit and Finance
Committee endorsed the development
of a revised whole system
performance framework for the
partnership. This will address all
outstanding points raised in the finding
and will include whole system
performance reports that will allow
Committee members to exercise
effective oversight, scrutiny and
challenge.  The range of associated
performance measures within both the
national outcome indicators and the
local performance framework will be
refreshed alongside the development
of the Strategic Commissioning Plan
2023-26 and the continued
development of the Programme of
Work.   
Original timescale: 
October 2019 
Revised timescales: 
March 2022
September 2023
We were pleased to note that
significant action has been taken in
this area, or is planned for the
coming months, to fully implement
the recommendations made,
We acknowledge that delays in
implementation were initially due to
the pandemic but were further
impacted by the Performance
Manager post being vacant for
approximately 18 months.  This
post has now been filled, with the
post holder taking up their position
mid-April 2023 and work is
progressing to meet the revised
timescales.
Given that action is required to
further improve the control
environment we assess the
residual risk as ‘Medium’ and
consider it important that the
agreed revised timescale of
September 2023 is achieved. We
suggest that the Board may wish to
consider noting the progress made
to date and to monitor
implementation going forward. 
7

Page 99

Https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Recurring/IJB/2022-23/0500_2023_003 IJB Follow Up/A - Findings and Reporting/A04a 20230606 IJB Follow-Up Final Report v1.0 as issued.docx 5
Appendix 1 (continued)  Management actions assessed as ‘not yet complete’ 
Report Details Details from original recommendation Current position per management update Original and
revised timescales Internal Audit comment
INTERNAL AUDIT
REPORT
Risk maturity
assessment
(August 2019)
Risk: Decisions may not fully reflect risk
management considerations. The Risk
Register may not reflect issues highlighted
within performance management and other
assurance reports.
Recommendation: IJB and Performance,
Finance and Audit Committee papers should
contain a section on risk which considers
whether issues raised should be included
within the risk register and overtly reflect the
impact on any existing strategic risks.
Performance reports should reference
relevant strategic risks and assess whether
scores are accurate and whether actions
intended to reduce risk to target level are on
track.
Category: Amber
There are still a number of reports being submitted
to the IJB and Performance, Finance and Audit
Committee where the Risk Management section
has either not been completed (i.e. it is blank) or
has been omitted completely from the implications
section of the report.  
A new IJB Reporting Template has been developed
as part of the IJB Governance Documents update
and this template now has a greater focus on
EQIAs, Risk, Participation and Engagement,
National Outcomes and Directions. IJB Reporting
Template Guidance has also been developed to
support authors when completing the reporting
template.
Original timescale: 
March 2020 
Revised timescales: 
June 2021
June 2022
September 2023
We were pleased to note that there
is now a higher percentage of reports
presented to the IJB and
Performance, Finance and Audit
Committee which contain a section
on risk.  We acknowledge that further
steps are planned to increase
compliance and fully address this
recommendation.   
We consider the revised timescale to
be reasonable and have assessed
the residual risk for this
recommendation as ‘Low’.
Accordingly, we would suggest that
the Board may wish to consider
agreeing to note the progress made
and the revised completion date.
ANNUAL
GOVERNANCE
STATEMENT  
Continuous
improvement actions
for 2021/22
Risk: N/A
Recommendation: To develop a sound
understanding of the impact for the North
Lanarkshire Health and Social Care
Partnership (NLHSCP) of the outputs of the
National Care Service legislation.
Category: N/A
Due to the uncertainty and lack of detail currently
available, this will be revisited once further clarity
has been obtained.
At the time of writing this report, the Scottish
Government had delayed further discussion and
consultation in respect of the National Care Service
legislation until after the Summer recess.
Original timescale:
March 2023 
Revised timescale:
To be determined once
further clarity obtained
regarding National Care
Service proposals 
We acknowledge that
implementation of the
recommendation has been delayed
as a result of the uncertainty and lack
of detail available in respect of the
new National Care Service.
Given the delay in implementation
and that action is required to further
improve the control environment, we
have assessed the residual risk as
'Medium' and consider it important
that, once further clarity has been
obtained, management consider and
agree an appropriate revised
timescale. 
8

Page 100

Https://nlcgov.sharepoint.com/sites/AUR-INTERNALAUDITFILES/Shared Documents/Recurring/IJB/2022-23/0500_2023_003 IJB Follow Up/A - Findings and Reporting/A04a 20230606 IJB
Follow-Up Final Report v1.0 as issued.docx 6 
Appendix 2  Residual risk rating definition
Internal Audit Assessment of Residual Risk from non-implementation 
High Non-implementation of actions has the potential to significantly undermine the relevant
control environment.
Medium Non-implementation of actions has the potential to impact upon the achievement of the
control environment.
Low Other issues which require management attention but which pose less significant or less
immediate impacts to the control environment. 
9

Page 101

1 
REPORT 
Item No: 8 
1. PURPOSE OF REPORT
1.1 This paper is coming to the Performance, Finance and Audit (PFA) Committee for:   
For approval  For endorsement  For noting 
1.2 This report provides a summary of the year-end position of the North Lanarkshire
Health and Social Care Partnership (HSCP) for the financial year 2022/2023 and
to seek approval for the transfer of funds to reserves. 
2. ROUTE TO THE PERFORMANCE, FINANCE AND AUDIT COMMITTEE
2.1 This paper has been:  
Prepared By:
Chief Finance
Officer
☒ Reviewed By:
Chief Officer
☒ Endorsed By: ☐    
3.       RECOMMENDATIONS
3.1  It is recommended that the PFA Committee: 
(1) Acknowledge the year-end financial position for 2022/23; and
(2) Approve the proposed transfers to General Reserves at para 7.2 and 7.3 of
this report. 
4. VARIATIONS TO DIRECTIONS 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 This report is based on the financial monitoring reports received from NHS
Lanarkshire Director of Finance and North Lanarkshire Council Head of Financial
Solutions.  The position detailed in these reports is therefore based on the
information contained in each partner’s respective financial systems and includes
accruals and adjustments in-line with their financial policies.   
6. CONCLUSIONS
6.1 Budget monitoring throughout 2022/23 has shown the IJB projecting an
underspend, prior to the transfer of year-end balances to General Reserves at the
financial year-end.   
6.2 As detailed in the table at para 6.4, the IJB final outturn was an underspend of
£35.495m.
SUBJECT: Financial Monitoring Report 2022/2023
TO: Performance, Finance and Audit Committee
Lead Officer for Report: Ross McGuffie, Chief Officer NHSCP
Author(s) of Report Amanda Kilburn, Chief Finance Officer 
DATE: 21 June 2023
Yes  No  N/A

Page 102

2 
6.3 Once all ring-fenced balances have been transferred to the relevant reserve in line
with Scottish Government guidance, the revised outturn was an underspend of
£14.084m. 
6.4 The table below shows the 2022/23 outturn position for North Lanarkshire IJB
before and after the transfer of Scottish Government and NHS Lanarkshire ring-
fenced funding to reserves: 
Service
2022/23
£m
Health Care Services £25.617m
Social Care Services £9.878m
Total North Lanarkshire HSCP 
(prior to transfer of ring-fenced reserves)  £35.495m
Ring-Fenced Funding (£21.411m)
Revised Outturn Total 2022/2023 £14.084m 
6.5 Subject to IJB approval, this underspend will be allocated to manage, on a non-
recurring basis, ring-fenced commitments, additional commitments relating to the
Strategic Commissioning Plan and any funding gap which is highlighted in the
North Lanarkshire IJB Medium Term Financial Plan 2023-2026. 
6.6 There are a number of reasons for the operational underspend of £14.084m
(excluding ring-fenced funding), and these include: 
 Employee Costs net underspend of £9.107m: as previously highlighted
there are ongoing challenges in terms of recruitment and retention issues
across all service areas.  For a wide range of posts recruitment has been
unsuccessful due to the availability of the skills mix required or the competition
being offered by other private and public sectors.  These are issues that are
being faced by IJBs across Scotland. 
 Payments to Other Bodies net underspend of £1.511m: the underspend is
primarily due to the staff shortages and vacancies within the Care at Home
sector who provide services to individuals via the self-directed support
commissioning framework.  There is also an underspend in package costs due
to slippage in Self-Directed Support (SDS) start dates.  It is anticipated these
are in-year underspends only and the full budget will be required in future
years. 
 Admin Costs net underspend of £1.431m: within the carers funding there is
currently an unallocated budget of £1.8m.  Work is continuing to allocate this is
relevant carers package in 2022/23.  This has been transferred to a dedicated
earmark reserve to fund carers pressures in 2023/24. 
 Income over recovery of £6.031m: for social care is due to the drawdown of
earmark reserves to offset expenditure relating to winter planning, adaptations,
digital and IT and staffing costs associated with services within Muirpark.

Page 103

3 
 Supplies and Services net overspend of £2.531m: the overspend is due to
additional purchases of PPE and staff uniform due to the increase in home
support staff and costs associated with winter planning.  There has also been
additional expenditure in relation to aids and adaptations to meet current
demand.  £1.550m additional income was drawn down from earmarked
reserves to offset some of this overspend and is showing in the over recovery
of income.   
 Prescribing net overspend of £1.750m: activity and cost per item within
prescribing is 3.19% higher compared to 2021/2022.  Due to the uncertainty
around costs and prescribing activity and the three-month time lag in receiving
the data, the volatility experienced within prescribing is likely to continue for the
foreseeable future. 
6.7 The table below shows the year-end financial position for 2022/23 for each client
group separated into pay costs and non-pay costs and excluding ring-fenced
reserves: 
6.8 Throughout financial year 2022/2023, adjustments are made to the original budget
due to additional budget allocations and budget transfers.  The table below shows
the funding allocations received from Scottish Government during 2022/2023: 
Scottish Government Allocations 2022/23 £m
Multi-Disciplinary Teams 1.743
Community Extended Care Pilot 0.933
Distress Brief Intervention 0.869
ICU Bed Capacity Uplift 0.044
Hospitals at Home 0.250
District Nursing 0.608
Long Covid Support Funding 0.320
Learning Disability Health Checks 0.246
Alcohol and Drug Partnership – Tranche 1 2.179
Alcohol and Drug Partnership National Mission 0.618
Veteran 1st Point 0.126
Child Death Review 0.024
Young Patient Family Fund 0.002
Outcomes Framework 2.773
Family Nurse Practitioner Funding 1.215
Pay
Budget
Pay
Costs
Less Ring-
Fenced
Reserves
Pay
Variance
Non-Pay
Budget
Non-Pays
Costs
Less Ring-
Fenced
Reserves
Non-Pay
Variance
Total
Under/(Over)
Spend
£m £m £m £m £m £m £m £m £m
Adult Social Care 87.970 85.969 2.001 153.788 145.911 7.877 9.878
North West Localities 18.374 16.424 (0.404) 1.546 2.014 2.174 (0.160) 1.386
North East Localities 15.475 14.066 1.408 1.511 1.736 (0.226) 1.182
Adult Services 14.553 13.568 (0.283) 0.702 5.670 5.840 (0.170) 0.532
Childrens Services 33.203 28.302 (3.202) 1.699 3.895 4.644 (0.749) 0.950
Mental Health &
Learning Disabilities 70.635 68.319 (1.216) 1.100 14.038 6.500 (7.482) 0.057 1.157
Area Wide Services 9.989 9.323 0.665 1.777 1.866 (0.088) 0.577
Other Areas 18.197 15.048 (3.165) (0.016) 78.190 72.344 (5.659) 0.187 0.171
Perscribing - - - 69.582 71.332 (1.750) (1.750)
TOTAL 268.396 251.020 (8.270) 9.106 330.466 312.347 (13.141) 4.978 14.084
Client Group
Year End Outturn 2022/2023

Page 104

4 
Mental Health Action 15 3.929
Mental Health Outcomes Framework 2.346
Mental Health Innovation Fund 0.487
Mental Health Perinatal, Infant, Maternity and Neonatal 0.107
Neurodevelopmental Pathway Pilot 0.100
CAMHS Capacity Building for Psychological Therapies 0.845
Dementia Post Diagnostic Support 0.322
Rapid Cancer GI 0.033
Funding for Naloxone 0.031
TOTAL 20.150 
7. GENERAL RESERVES
7.1 It is important for the long-term financial stability and the sustainability of the IJB
that sufficient funds are held in reserve to manage unanticipated pressures from
year to year.  The requirement for financial reserves is acknowledged in statue
and is part of a range of measures in place to ensure that s106 public bodies do
not over-commit themselves financially. 
7.2 In closing the annual accounts and in line with the IJB Reserves Policy, the PFA is
asked to approve the transfer of an additional £35.495m to IJB reserves as
detailed in appendix 4. 
Summary
New Reserves 2022/23
(Pending PFA Approval)
£m
Scottish Government Ring-Fenced Reserves 18.621
Health Ring-Fenced Reserves 2.790
Total Ring-Fenced Reserves 21.411
Earmarked Reserves 6.199
Contingency Reserves 7.885
Total  35.495 
7.3 The increase to reserves will continue to enable the IJB to meet its strategic
objectives, and Scottish Government policy requirements.  In particular, it is
proposed that two new earmarked reserves are created for the following purposes: 
 £0.650m window replacement on Mental Health wards following a contravention of
health and safety law notified by the Health and Safety Executive to NHS
Lanarkshire Health Board on 30th November 2022.  This reserve may need to be
increased as detailed costs becomes available. 
 £3.169m social worker regrading of posts, following a range of challenges
impacting on the sustainability of the social worker workforce and the consequent
vulnerabilities with respect to service delivery.  This reserve will cover a three-year
period to allow a recurring funding solution to be identified.  Additional details
regarding this regrading can be found at appendix 5. 
7.4  Within the ring-fenced reserves total of £21.411m, there is funding of £2.790m
provided by NHS Lanarkshire for unscheduled care pressures in 2023/24.  This is
to assist the IJB to meet its delegated responsibilities relating to unscheduled care
and is in addition to any specific Scottish Government funding such as
multidisciplinary teams and Health Care Social Workers funding which the IJB is
already deploying.

Page 105

5 
7.5 The table below shows the final summary position for 2022/23 adjusted for the
drawdown of reserves in 2022/2023 and pending approval of the new reserves
detailed in appendix 4: 
7.6 The IJB contingency reserves currently equate to 3% of the financial envelope. 
Appendix 6 shows a detailed list of all reserve movement during 2022/23. 
7.7 Regular updates will be provided to the IJB throughout 2023/24 as analysis and
reviews of all reserves are monitored to ensure they continue to meet on-going
pressures and remain fit for purpose.   
7.8 Appendix 7 shows all new reserves created in 2022/2023 including a key guidance
table showing how these new reserves are aligned to our five ambition statements
detailed in the Strategic Commissioning Plan 2023-2026. 
8. COVID-19 RESERVES
8.1 Throughout 2022/2023 Covid-19 costs has been reported to the Scottish
Government through the Lanarkshire Finance Performance Return (FPR).  The
Covid-19 costs incurred for the partnership in 2022/2023 totalled £7.072m.   
8.2 As previously advised to the PFA Committee, £24.051m of uncommitted Covid-19
reserves were returned to the Scottish Government in January 2023.  The
remaining Covid-19 balance of £1.865m was also returned in April 2023, bringing
the total funding reclaimed by Scottish Government to £25.916m.  A small balance
of £7k has been retained to provide unpaid carers with PPE. 
8.3 The table below shows the movement for the financial year 2022/2023: 
Summary of Covid-19 Funding and Costs 2022/2023
£m
NHS Lanarkshire Funding
North Lanarkshire Council Funding
Uncommitted Funding Returned to Scottish Government
Adjustment to Covid-19 Reserve
NHS Lanarkshire Costs
North Lanarkshire Council Costs
(31.686)
(1.342)
25.916
0.033
5.730
1.342
Balance as at 31/03/2023 (0.007) 
Opening
Balance As
At
1 April 2022                   
Proposed
Transfers To
/ From
Reserves
Drawdown
from
Reserves
Revised
Balance As At
31 March
2023
£m £m £m £m
NHSL Ring-Fenced Reserves 48.998 (5.562) (15.859) 27.577
NHSL & NLC Earmarked Reserves 30.772 24.521 (7.885) 47.408
NHSL & NLC Risk-Based Reserves 13.478 2.490 (1.067) 14.901
NHSL Contingency Reserves 4.167 4.267 (0.374) 8.060
NHSL & NLC Closed Reserves 22.037 (16.029) (6.008) 0.000
119.452 9.687 (31.193) 97.946Total
SUMMARYLEAD

Page 106

6 
9. VACANCY POSITION 2022/2023
9.1 As highlighted throughout this report, employee costs final outturn created a
significant underspend within all services.   
9.2 The table below shows the full time equivalent (FTE) vacancy numbers at 31
March 2023 within each service compared against their budgeted establishment: 
9.3 To help cover the vacant posts throughout 2022/2023, agency staff, bankaide,
overtime and excess part time hours were used.  A detailed analysis of these
costs is at Appendix 8. 
SERVICE
2022/2023 
Overtime                            
Excess Part
Time Bankaide   Agency   
£m £m £m £m
North West Locality 0.157 0.048 0.605 0.163
North East Locality 0.097 0.052 0.262 -
Adult Services 0.077 0.087 0.224 0.109
Children Services 0.223 0.109 0.427 0.021
Mental Health & Learning Disabilities 0.524 0.101 2.459 3.294
Social Care Services 1.142 - - 0.179
Home Support 4.382 - - -
Other 0.037 0.022 0.028 -
TOTAL 6.638 0.420 4.005 3.765 
10. DELEGATED SERVICES 2022/2023
10.1 The following table shows the costs of other North Lanarkshire Council services
delegated to the IJB during 2022/2023.  The outturn position at 31 March 2023 is
breakeven for both services.  
Service Expenditure
£m
Income
£m 
Housing 1.886 (1.886) Breakeven
Transport 0.551 (0.551) Breakeven
Total 2.437 (2.437) Breakeven 
Establishment Actual Vacancies
FTE FTE FTE
North West Locality 384.80 344.36 40.44
North East Locality 322.58 296.00 26.58
Adult Services 277.68 289.71 -12.03
Children Services 571.96 483.62 88.34
Mental Health 1,174.71 1,098.93 75.78
Social Care Services 834.20 653.80 180.40
Home Support 1,000.07 995.99 4.08
Other 130.28 260.79 -130.51
TOTAL 4,696.28 4,423.20 273.08
Service

Page 107

7 
11.  IMPLICATIONS
11.1 NATIONAL OUTCOMES  
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonably practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☐
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☐
Health and Social Care Services contribute to reducing health inequalities  ☐
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care, and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
11.2 ASSOCIATED MEASURE(S) 
Each partner is required to remain within their approved budgetary provision.   
11.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
11.4 RISK ASSESSMENT/RISK MANAGEMENT 
The strategic financial risks detailed in the IJB Risk Register has been updated
where necessary and are included in a separate report to the IJB. 
Relevant Risk Register Details  Current Risk Level  Risk Owner 
Financial Challenges High Amanda Kilburn
Prescribing Activity and Costs Very High Ross McGuffie 
11.5 ENGAGEMENT & PARTICIPATION
Please tick the engagement and participation objectives that link(s) with this piece
of work and provide further details on the engagement and participation that was
undertaken. 
Objectives  Further details 
☒ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
The Director of Finance of NHSL
and the Head of Financial Solutions
of NLC both continue to be
consulted on the financial position
of the NL IJB.
☐ Provide stakeholders with information on
how to get involved 
☐ Ensure a diverse range of engagement
and participation and opportunities are in

Page 108

8 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design, and
delivery of our services 
☒ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
Financial information is shared with
stakeholders on a regular basis and
is provided to the PFA and IJB on a
quarterly basis.
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings 
☐ Develop participation guidelines to ensure
a common understanding and set of 
expectations for both stakeholders and
partnership staff 
☒ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
IJB Financial Plan and Reserves
Strategy aligns and supports the
IJB Strategic Commissioning Plan
to ensure robust financial
monitoring and scrutiny. 
11.6  INEQUALITIES & FAIRER SCOTLAND DUTY
Equality and Diversity Impact Assessment Completed & Fairer Scotland Impact
Assessment Form Completed and EQIA added to website: 
Yes  No  N/A 
12. BACKGROUND PAPERS 
None. 
13. APPENDICES 
Appendix 1 - North Lanarkshire Health and Social Care Partnership Budget 
Appendix 2 - Hosted Services Led by North Lanarkshire 
Appendix 3 - Hosted Services Led by South Lanarkshire 
Appendix 4 – HSCP Final Outturn 2022/23 – Transferred to Reserves
Appendix 5 -  Social Work Regrading of Posts 
Appendix 6 - North Lanarkshire IJB General Reserves 2022/2023 
Appendix 7 - New Reserves Created in 2022/2023 
Appendix 8 - Analysis of Additional Employee Costs 
Chief Finance Officer   
Members seeking further information about any aspect of this report, please contact
Amanda Kilburn on telephone number 07816 126362.

Page 109

9 
North Lanarkshire Health and Social Care Partnership Budget Appendix 1
Budget Actual Variance
Expenditure 2022/2023 March 2023 March 2023
£m £m £m
Health Care Services
Locality and Other Services 59.075 49.424 9.651
Addiction Services 6.792 4.219 2.572
Medical and Nursing Directorate 5.644 4.805 0.839
Prescribing 69.582 71.332 (1.750)
Out of Area Services 4.571 5.115 (0.544)
Area Wide Services 11.766 11.189 0.577
Hosted Services 175.077 160.805 14.272
Family Health Services 115.625 115.625 0.000
Set-Aside Budget 69.120 69.120 0.000
Covid-19 5.730 5.731 (0.000)
Total Expenditure - NHSL 522.982 497.365 25.617
Social Care Services
Social Care Services Gross Expenditure 241.758 239.996 1.762
Social Care Services Gross Income (2.893) (11.009) 8.116
Social Care Services Net Expenditure 238.865 228.987 9.878
Housing Revenue Account Expenditure 1.870 1.870 0.000
Transport Services Expenditure 0.551 0.551 0.000
Social Care, Housing and Transport Services Net Expenditure 241.286 231.408 9.878
Total Expenditure - NHSL and NLC 764.268 728.773 35.495
Funded By: Annual
Budget
2022/2023
£m
NHS Lanarkshire Funding (497.820)
Social Care Funding (22.964)
Resource Transfer (23.421)
Commissioned Services (6.721)
Scottish Government Funding - Covid-19 and Remobilisation (5.730)
Transfer from Reserves (Approved) (19.432)
Total Funding - NHSL (576.088)
NLC Funding - Social Care Services (185.759)
NLC Funding - Housing Services (1.870)
NLC Funding - Transport Services (0.551)
Transfer from Reserves (Approved) 0.000
Total Funding - NLC (188.180)
Total Funding - NHSL and NLC (764.268)

Page 110

10 
Hosted Services Appendix 2
North Hosted Services
March 2023 March 2023 March 2023 March 2023 March 2023 March 2023 March 2023 March 2023 March 2023
Budget Actual Variance Budget Actual Variance Budget Actual Variance
2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023
£m £m £m £m £m £m £m £m £m
Sexual Health Services 3.146 2.974 0.171 1.604 1.433 0.171 1.541 1.541 0.000
Continence Services 2.402 2.452 (0.050) 1.225 1.275 (0.050) 1.177 1.177 0.000
Immunisation Services 1.918 2.473 (0.556) 0.978 1.534 (0.556) 0.940 0.940 0.000
Speech and Language Therapy Services 6.520 5.994 0.525 3.325 2.800 0.525 3.195 3.195 0.000
Children and Adolescents Mental Health Services 14.679 11.127 3.552 7.486 3.934 3.552 7.193 7.193 0.000
Childrens Services 12.316 12.220 0.096 6.281 6.185 0.096 6.035 6.035 0.000
Integrated Equipment and Adaptations Store 0.567 0.710 (0.142) 0.289 0.432 (0.142) 0.278 0.278 0.000
Dietetics Services 4.074 3.753 0.321 2.078 1.757 0.321 1.996 1.996 0.000
Podiatry Services 4.592 4.434 0.158 2.342 2.184 0.158 2.250 2.250 0.000
Prisoner Healthcare Services 1.784 1.908 (0.124) 0.910 1.034 (0.124) 0.874 0.874 0.000
Blood Borne Viruses Services 1.560 1.535 0.025 0.795 0.771 0.025 0.764 0.764 0.000
Hospital at Home 2.606 2.166 0.440 1.329 0.889 0.440 1.277 1.277 0.000
Mental Health and Learning Disability Services 84.674 74.819 9.855 43.184 33.329 9.855 41.490 41.490 0.000
TOTAL 140.837 126.565 14.272 71.827 57.555 14.272 69.010 69.010 0.000
South Lanarkshire IJB - 49% ShareNorth Lanarkshire IJB - 51% Share
Hosted Services Appendix 3
March 2023 March 2023 March 2023 March 2023 March 2023 March 2023 March 2023 March 2023 March 2023
Budget Actual Variance Budget Actual Variance Budget Actual Variance
2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023 2022/2023
£m £m £m £m £m £m £m £m £m
Community Dental Services 7.856 7.081 0.775 4.007 4.007 0.000 3.850 3.074 0.775
Brain Injury Unit 2.737 1.856 0.881 1.396 1.396 0.000 1.341 0.460 0.881
Out of Hours Services 9.424 9.003 0.420 4.806 4.806 0.000 4.618 4.197 0.420
Palliative Care Services 7.329 7.412 (0.084) 3.738 3.738 0.000 3.591 3.675 (0.084)
Physiotherapy Services 10.855 10.427 0.428 5.536 5.536 0.000 5.319 4.891 0.428
Primary Care Services 0.886 0.810 0.076 0.452 0.452 0.000 0.434 0.358 0.076
South Improving Cancer Journey 0.046 0.047 (0.001) 0.024 0.024 0.000 0.023 0.023 (0.001)
Occupational Therapy Services 8.530 7.909 0.621 4.350 4.350 0.000 4.180 3.559 0.621
Diabetic Services 5.194 5.113 0.080 2.649 2.649 0.000 2.545 2.464 0.080
Telehealth 0.711 0.319 0.392 0.362 0.362 0.000 0.348 (0.044) 0.392
Sub Total 53.569 49.979 3.590 27.320 27.320 0.000 26.249 22.659 3.590
Ring Fenced Funding
Primary Care Improvement Fund 13.569 10.973 2.595 6.920 6.920 0.000 6.649 4.053 2.595
Primary Care Transformation Fund 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Sub Total 13.569 10.973 2.595 6.920 6.920 0.000 6.649 4.053 2.595
TOTAL 67.137 60.952 6.185 34.240 34.240 0.000 32.897 26.712 6.185
South Lanarkshire IJB - 49% ShareLed by South Partnership North Lanarkshire IJB - 51% Share

Page 111

11 
Appendix 4
Scottish
Government
Ring-
Fenced
Reserve
NHS
Lanarkshire
Ring-Fenced
Reserve
New
Earmarked
Reserves
Realignment
to Existing
Earmarked
Reserves
Increase to
Existing
Contingency
Reserves
Total
Underspend
2022/2023
£m £m £m £m £m £m
Alcohol and Drug Partnership Funding 2.572 2.572
Area Wide Services - Refugees and Displaced Persons 0.056 0.056
Blood-Borne Viruses Services 0.025 0.025
Children and Adolescent Mental Health Services 3.201 3.201
District Nursing - Scottish Government Funded 0.376 0.376
Hospital at Home Services - Support Development 0.250 0.250
Learning Disabilities Health Checks 0.246 0.246
Long Covid Pathways 0.320 0.320
Medical Director - Child Death Review Funding 0.012 0.012
Mental Health and Learning Disability Services - Action 15 3.930 3.930
Mental Health and Learning Disability Services - Distress Brief Intervention 3.155 3.155
Mental Health Covid Clinicians (Cossette) 0.200 0.200
Mental Health - Diagnostic Support Service Dementia Post 0.322 0.322
Mental Health Eating Disorders 0.070 0.070
Mental Health Neurodevelopmental Pathways 0.100 0.100
Mental Health Perinatal, Infant, Maternity and Neonatal 0.005 0.005
Mental Health Psychology Posts 0.670 0.670
Mental Health Pharmacy Recovery Plan 0.175 0.175
NES SLA Pharmacy Training 0.173 0.173
North Planning Band 2-4 Posts 0.933 0.933
Upper GI Dietetics Band 4 0.033 0.033
Business Case - Health Care Support Workers, Multi-Disciplinary Teams 1.797 1.797
Unscheduled Care Funding 2.790 0.330 3.120
Scottish Clinical Leadership Fellowship 0.074 0.074
Adaptations Fund 0.289 0.289
Carers Act 2018 - Support 1.800 1.800
Area Wide Services - Pre School Vision Screening (0.075) (0.075)
Shielding - Social Care Support Fund (0.038) (0.038)
Contingency Balance Held By NHSL 3.265 3.265
Contingency Balance Held By NLC 4.620 4.620
Social Workers Regrading of Posts 3.169 3.169
Mental Health Wards Window Replacement 0.650 0.650
New Reserves 18.621 2.790 3.819 2.380 7.885 35.495
HSCP Final Outturn 2022/2023 - Transferred to Reserves

Page 112

12 
Social Work Regrading of Posts - Additional Information from Chief Social Work Officer and Head of Adult Social Work Services        Appendix 5 
Over the past year increasing concerns around the sustainability of the frontline social work force have emerged and been further analysed and considered by the social workforce group, which provides a
vehicle to consider cross-cutting professional and workforce issues for all social work care groups.  In the context of growing demand and new national investment (some temporary) in posts to address
both policy priorities and post Covid backlogs there has been a national shortage of social workers.  Detailed local analysis of recruitment and turnover supplemented by intelligence from staff engagement
identified challenges with respect both to recruitment and retention in particular of both experienced staff and frontline managers.   
For experienced staff both salary comparisons with neighbouring authorities and the areas relating to wide working context were identified as problematic, against which previous measures, principally the
implementation of a senior practitioner scheme, were insufficiently effective.  Resulting vacancy levels and the impact of turnover on experience levels and workforce balance were identified as key risks to
service delivery which could not await the outcome of national discussions to address issues.  It was also identified that job profiles/descriptions for frontline social workers/senior social workers were
outdated and no longer reflected day to day demands, and workforce qualities required to deliver on key priorities specifically the need for empowered and trauma informed practitioners able to operate in
an integrated and increasingly complex legislative environment. 
In response to this a number of actions were proposed and approved by the council’s corporate management team in February 2023 subject to further work on related costs and funding: 
 Continuation of the successful Supported Year in Practice Pilot for Newly Qualified Social Workers – confirmation has since been received that this will receive grant funding from Scottish
Government for a further year prior to arrangements being rolled out nationally from 2024. 
 Further work with the council’s Training and Organisational Development Team to bring post qualifying support and training opportunities together into a coherent framework to enhance practice
and professional support, CPC, career pathways and succession planning to enhance skills and ensure a clearer and more attractive offer to staff.  This will be cost neutral. 
 The re-establishment of a small scale ‘grow your own scheme’ for social workers recruiting from support and para-professional roles within the service.  This will be funded for 4 years from an
earmarked reserve and government funding targeted at enhancing the social work workforce.  There is the potential that this may be supplemented in future by national initiatives in this area.  In the
interim a minimum of 6 trainees will be supported through these funds. 
 Management initiated re-evaluation of relevant job roles though the council’s job-evaluation scheme to ensure these are reflective of current requirements and demands.  This has led to the re-
valuation of social worker and NLC occupational therapist roles from NLC10 to NLC11 and senior social worker and relevant team leader roles from NLC12 to NLC13 subsequently agreed in line
with NLC processes through the North Lanarkshire Council Workforce Steering Group on 28 April 2023.  It is anticipated that this will support the retention as well as recruitment of staff in the
current market and importantly ensuring that job roles are fit for the purpose and ambition of the council/partnership. 
The re-evaluation for Children and Families Social Work will be funded through funding allocated to the Education and Families Service to address a range of cost pressures, whilst funding for the change
within Justice will be covered from Section 27 grant.   
The additional cost for Adult Services will be funded from an earmarked reserve pending approval.

Page 113

13 
North Lanarkshire IJB APPENDIX 6
Movement on Reserves Audit Trail NHSL & NCL
Opening
Balance As At
1 April 2022                   
Proposed
Transfers To /
From
Reserves
Drawdown
from
Reserves
Revised
Balance As At
31 March 2023
£m £m £m £m
NHSL Ring-Fenced Reserves 48.998 (5.562) (15.859) 27.577
NHSL & NLC Earmarked Reserves 30.772 24.521 (7.885) 47.408
NHSL & NLC Risk-Based Reserves 13.478 2.490 (1.067) 14.901
NHSL Contingency Reserves 4.167 4.267 (0.374) 8.060
NHSL & NLC Closed Reserves 22.037 (16.029) (6.008) 0.000
119.452 9.687 (31.193) 97.946
Opening
Balance As At
1 April 2022                   
Transfers To /
From
Reserves
Drawdown
from
Reserves
Revised
Balance As At
31 March 2023
£m £m £m £m
NHSL Alcohol and Drug Partnership Funding 3.154 2.572 (2.800) 2.926
NHSL Alcohol and Drug Partnership - Local Implementation Plan 0.167 0.167
NHSL Alcohol and Drug Partnership - Long Acting Buprenorphine 0.255 0.255
NHSL Area Wide Services - Refugees and Displaced Persons 0.400 0.056 (0.206) 0.250
NHSL Blood-Borne Viruses Services 0.146 0.025 0.171
NHSL Children and Adolescent Mental Health Services 5.333 3.201 (4.433) 4.101
NHSL Community Living Change Fund 1.298 1.298
NHSL Covid-19 Funding 29.742 (25.950) (3.785) 0.007
NHSL District Nursing - Scottish Government Funded 0.376 0.376
NHSL Hospital at Home Services - Support Development 0.414 0.250 (0.043) 0.621
NHSL Learning Disabilities Health Checks 0.246 0.246
NHSL Long Covid Pathways 0.764 0.764
NHSL Medical Director - Child Death Review Funding 0.021 0.012 (0.021) 0.012
NHSL Mental Health and Learning Disability Services - Action 15 3.019 3.930 (3.019) 3.930
NHSL Mental Health and Learning Disability Services - Distress Brief Intervention 1.552 3.155 (1.552) 3.155
NHSL Mental Health Covid Clinicians (Cossette) 0.200 0.200
NHSL Mental Health - Diagnostic Support Service Dementia Post 0.429 0.322 0.751
NHSL Mental Health Eating Disorders 0.070 0.070
NHSL Mental Health Neurodevelopmental Pathways 0.100 0.100
NHSL Mental Health Perinatal, Infant, Maternity and Neonatal 0.005 0.005
NHSL Mental Health Psychology Posts 0.670 0.670
NHSL Mental Health Recovery Renewal - Facilities Projects 1.840 1.840
NHSL Mental Health Wellbeing in Primary Care Services 0.148 0.148
NHSL Mental Health Pharmacy Recovery Plan 0.175 0.175
NHSL NES SLA Pharmacy Training 0.173 0.173
NHSL North Planning Band 2-4 Posts 0.933 0.933
NHSL Staff Wellbeing 0.254 0.254
NHSL Test and Protect Funding 0.520 0.520
NHSL Third Sector Initiatives To Improve Health 0.306 0.306
NHSL Unscheduled Care Funding 3.120 3.120
NHSL Upper GI Dietetics Band 4 0.033 0.033
48.998 (5.562) (15.859) 27.577TOTAL RING-FENCED RESERVES
LEAD SUMMARY
Total
LEAD RING-FENCED RESERVES
Opening
Balance As At
1 April 2022                   
Transfers To /
From
Reserves
Drawdown
from
Reserves
Revised
Balance As At
31 March 2023
£m £m £m £m
NLC Long Covid Contingency 3.000 (1.051) 1.949
NHSL Prescribing Fund 4.361 4.361
NLC Social Care Demand 6.117 2.490 (0.016) 8.591
13.478 2.490 (1.067) 14.901
Opening
Balance As At
1 April 2022                   
Transfers To /
From
Reserves
Drawdown
from
Reserves
Revised
Balance As At
31 March 2023
£m £m £m £m
NHSL Contingency Balance Held By NHSL 4.167 4.267 (0.374) 8.060
4.167 4.267 (0.374) 8.060
LEAD CONTINGENCY FUND RESERVES
TOTAL RISK-BASED RESERVES
LEAD RISK-BASED RESERVES
TOTAL CONTINGENCY FUND RESERVES

Page 114

14 
Opening
Balance As At
1 April 2022                   
Transfers To /
From
Reserves
Drawdown
from
Reserves
Revised
Balance As At
31 March 2023
£m £m £m £m
NHSL Adult Social Care Winter Preparedness Fund 1.941 1.941
NLC Adaptations Fund 0.289 0.289 (0.289) 0.289
NLC Adult Protection (share with C&F and NHSL) 0.050 0.050
NLC Advocacy Services 0.123 0.061 (0.066) 0.118
NHSL Area Wide Services - Health Promotion - North Lanarkshire Leisure agreement 0.123 0.123
NHSL Area Wide Services - NES Training 0.132 0.132
NHSL Area Wide Services - Primary Care Corporate (iHUB Project - NES funding) 0.034 0.034
NLC Assistive Technology Contract x 12 months (ATC) 0.090 (0.082) 0.008
NHSL Breast Feeding Team (2 year funding) 0.828 0.828
NHSL Business Case - Health Care Support Workers, Multi-Disciplinary Teams 1.794 1.797 (1.794) 1.797
NLC Business Case - Non-Recurring NLC Costs 5.380 0.537 (2.106) 3.811
NHSL Care Homes Allocation 0.318 0.318
NLC Carers Act 2018 - Support 0.852 1.800 (0.009) 2.643
NHSL Champions Board Funding 0.172 0.172
NHSL Children and Adolescent Mental Health Services - Udston Top Up Funding 0.346 0.346
NHSL Childrens Services - Paediatric Band 7, Band 6 x 4.12 WTE, Band 2 x 9.59 WTE 0.645 (0.231) 0.414
NHSL Development of Chryston Community Health Clinic 0.212 0.212
NHSL Dietetics Services - Double Running Costs 0.110 0.110
NLC Digital and IT Strategy Technology Improvements - Community Alarms 0.694 (0.106) 0.588
NLC Digital and IT Strategy Technology Improvements - Home Support Scheduling System 1.000 2.776 3.776
NLC Digital and IT Strategy Technology Improvements - Other 0.566 0.566
NLC Digital and IT Strategy Technology Improvements - SWIS 0.700 0.700
NHSL Discharge Support Workers Band 4 x 2 WTE 0.107 0.107
NHSL Distinction Awards 0.036 0.036
NLC Financial Strategy - Changes to LA Services Muirpark 2.973 (1.874) 1.099
NHSL Forensic Band 3 x 5 WTE 0.147 0.147
NHSL GPIT Reprovisioning Gap 0.181 0.181
NHSL Health Inequalities - Screening 0.098 (0.027) 0.071
NHSL Health Visiting Students/Trainees 0.840 (0.356) 0.484
NLC Home Support Resilience (2 year funding) 3.498 3.498
NHSL HR Employability Team (2 year funding, 50:50 split between North and South) 0.187 0.187
NLC IJB Helpline (2 years funding) 0.600 (0.025) 0.575
NHSL Integrated Authority Support 6.076 (1.150) 4.926
NHSL Kylepark Works 1.000 0.608 (0.030) 1.578
NHSL Learning Disabilities Band 3 x 4 FTE 0.118 0.118
NLC Local Government Pay Award 23/24 2.653 2.653
NLC Mental Health Social Workers 2 x NL10 x 24 months 0.107 (0.038) 0.069
NHSL Mental Health Wards Window Replacement 0.500 0.500
NHSL Minor Capital Works 1.387 (0.225) 1.162
NHSL Neonatal & Paediatrics Dieteics Intervention (3 year funding) 0.550 0.550
NHSL Organisational Development Fund 0.260 0.260
NHSL Paediatric Diabetes Insulin Pumps and Additional Staff 0.908 (0.027) 0.881
NLC Planned Date of Discharge - Discharge To Assess 0.200 0.241 (0.137) 0.304
NLC Planned Date of Discharge - Locality Social Work Manager Post 0.055 0.096 (0.074) 0.077
NHSL Podiatry Services - Foot Screening 0.459 (0.033) 0.426
NHSL Prisioner Healthcare - Transitional Project Band 8A 0.070 0.070
NHSL Psychology Posts 2 x Band 6 0.098 0.098
NHSL Regrading of Posts Including Backpay 0.125 0.125 0.250
NHSL Scottish Clinical Leadership Fellowship 0.045 0.074 (0.019) 0.100
NHSL Sexual Health Services - Forensic Medical 0.222 (0.047) 0.175
NHSL Sexual Health Services - Long-Acting Reversible Contraception (LARC) 0.109 0.386 (0.004) 0.491
NLC Social Care Contracting Staff within Quality Assurance Services 0.047 0.028 (0.072) 0.003
NLC Social Care Regrading of Staff (SSW, SP, SW, OT, TL and TM) 3.169 3.169
NLC/NHSL Staff Training Academy 2.400 2.400
NHSL Stigma Free Lanarkshire (3 year funding) 0.450 0.450
NHSL Supervisor Training 0.077 (0.012) 0.065
NLC Unmet Saving 21/22 - IDS/LSS (merging building Coatbridge & Cumbernauld) 0.086 (0.086) 0.000
NLC Violence Against Women (Joint Initiative with SLC and C&F) 0.030 0.030
NHSL Vulnerable and Complex Cases - Test of Change 1.208 (0.116) 1.092
30.772 24.371 (7.885) 47.258
LEAD EARMARKED RESERVES
TOTAL EARMARKED RESERVES
22.037 (16.029) (6.008) 0.000
119.452 9.687 (31.193) 97.946
TOTAL CLOSED RESERVES
TOTAL RESERVES

Page 115

15 
Reserve Title Reserve Description Pending Approval
21 June 2023
Approved  by IJB
22 March 2023
Ambition
Statement Key
Window Replacement on Mental Health Wards
To comply with the Notification of Contravention to secure patient accessible windows
within Wards 19 and 20 in a closed position pending replacement of a 'Polar' ligature
reduction design window.  Anticipated timeline is September 2023.
 2, 4
Social Worker Regrading
To address the immediate and medium-term recruitment and retention challenges with a
view to ensuring an empowered and effective social work workforce.  This includes a
revised and strengthened recruitment model, alongside further work to enhance whole
career support and development allied to the wider ambitions of Workforce for the Future.
 3
Breast Feeding Team
To introduce a peer support model to improve breastfeeding initiation and reduce attrition
and to introduce a seven-day support provision to deliver person centred care through the
mother's postnatal journey from hospital discharge to one year post birth.
 1, 2, 5
Development of Chryston Community Health ClinicTo fund the repatriation of services under 'The Plan for North Lanarkshire' which sets out
an estates strategy to develop community hubs and campuses.  1, 5
HR Employability Team To fund a dedicated HR team within health with the cost split 50:50 between North and
South Lanarkshire partnerships.  3
Long Covid Pathways
To support people with long term effects of Covid-19 where their physical and mental
wellbeing has suffered.  This earmarked reserve will allow continued investment in
recruitment to deliver improved care and support for people living with long Covid and will
ensure it remains a priority.
 2, 3, 4, 5
Neonatal and Paediatrics Dietetics Support
To provide premature babies with dietetic intervention aimed at reducing morbidity and
mortality rates, reducing length of hospital stays, improving short and long-term
neurodevelopment and growth outcomes and providing support to parents/carers.
 1, 2, 5
Organisational Development Fund To support the 2023/24 organisational development plan focussing heavily on sector and
unit management team development.  3
Psychology Posts 2 x Band 6 To fund additional posts within Psychology to help with the substantial waiting lists by
extending trainee contracts until March 2024.  3, 4
Staff Training Academy
To assist the development of staff by offering apprenticeships and support to implement a
HSCP 'Grow our Own' initiative in recognition of the ongoing challenges in recruitment and
retention and a national shortage of key skills.
 3
Stigma Free Lanarkshire To continue investment in addressing challenging mental health stigma and discrimination
in line with the outcomes in the Lanarkshire Mental Health Strategy.  2, 4
Vulnerable and Complex Cases
To provide co-ordinated, person-centred, care managed approach with individuals who
have often become disengaged and need assistance to be re-directed and reconnected to
appropriate services within the Health and Social Care settings or the community.
 5
Assistive Technology 12 Month Contract
To fund a 12-month contract that provides a service to the council in assessing,
recommending, and procuring assistive technologies to enable our employees with a
disability or impairment to maximise their ability to work effectively.
 3, 4
Home Support Resilience
To support the effective recruitment and retention of home support staff by maintaining
and increasing the number of pool cars available to the service and offering home support
worker incentives.
 3, 4
IJB Cost-of-Living Helpline
To maintain and enhance the existing single point of contact for advice on a range of
impacts from the cost-of-living crisis.  This would provide one gateway for residents to
receive direct advice and where required a direct route to follow up appointments for
support.
 1, 4, 5
Local Government Pay Award 23/24 To assist with the on-going staffing pay pressure.  This will cover 2023/24 financial year
only and will be replaced by a recurring budget in 2024/25.  3
Ambition
Statement Key
Do The Right Thing First Time
When people contact our services, we need to respond quickly and effectively, with a focus on
helping people to help themselves first.                                                                                                                                    
We will continue to develop ‘First Point of Contact’ by incorporating good conversations across the
HSCP and prioritising and embedding the whole system approach to get it right first time.
1
Increased Focus on Prevention, Early
Intervention and Tackling Inequalities by
Working with Communities and People
The population and needs analysis highlighted the need to do things differently, to understand the
demographic challenges facing North Lanarkshire and to harness the opportunities of people living
healthier lives for longer.                                                                                                                                                     
We need to keep changing the way we deliver services and support people, focusing more on
prevention, early intervention, and empowering people to live fulfilling lives.                                                                              
By providing ‘upstream’ support at an early stage, we can reduce the demand on intensive health and
care services and re-invest in more community focused support services.                                                                      
By working with our partners in the Third Sector, we can identify, support, and develop local
community-based programmes, run by voluntary and independent organisations that focus on the
health and care needs of local communities.                                                                                                                                           
We will continue to support and empower people to continue to live healthy, meaningful, and more
personally satisfying lives as active members of their community for as long as possible by showing
ambition and innovation to develop and try new ways of providing services.                                                        
We value and recognise the vital role local people and communities play by continuing to ensure we
listen and provide a voice to their needs and aspirations.                                                                                                       
We will continue to engage and participate with local people as we extend into the delivery of our
partnership priorities.
2
Develop And Support a Workforce for The
Future
The increase in ageing population of North Lanarkshire is broadly mirrored within the workforce of the
Health and Social Care sector, therefore it is important for us to be cognisant of this and ensure
mechanisms are put in place to allow flexibility and support to our workforce to ensure their physical
and mental health is nurtured.                                                                                                                                                    
There are also continuing challenges with regards to resourcing, attracting, recruiting, and retaining
staff.  Whole system planning requires further development to better understand the needs and
demands of communities including the public health challenges, the types of roles needed to support
different care needs, and the availability of different types of workers over time and geographically.
3
Mental health concerns are continuing to increase in the population which could lead to a greater
demand for mental health services and community supports.                                                                                                 
There is a need for a refreshed and reinvigorated approach to mental health improvement with the
focus on the four core areas within the Lanarkshire Mental Health and Wellbeing Strategy: 
·         Good mental health for all
·         Improving access to mental health supports and services
·         Children and young people’s mental health and wellbeing
·         Specialist mental health services
Supporting People Through a Whole
Family Approach
Our aspiration is to support adults and children of all ages with the tools to set, plan and achieve their
goals together.                                                                                                                                                                      
This puts wellbeing at the heart of our approach by considering the situation that adults and children
live in, who they live with and their family relationships.                                                                                                 
In practice, this means understanding each person as an individual, as well as recognising the part
they play in their family and community.  This approach builds on people’s strengths and resilience.
5
STRATEGIC COMMISSIONING PLAN 2023-2026 AMBITION STATEMENT
4Improve Mental Health and Wellbeing
Appendix 7NORTH LANARKSHIRE IJB NEW RESERVES CREATED IN 2022/2023:

Page 116

16 
Analysis of Additional Employee Costs Appendix 8
North West
Locality                           
£
North East
Locality                        
£
Adult
Services                 
£
Children
Services            
£
Mental
Health                 
£
Other           
£
TOTAL     
£
1 44,000 32,000 17,500 35,500 209,500 2,000 340,500
2 44,000 32,000 17,500 35,500 209,500 2,000 340,500
3 53,000 34,000 22,000 30,000 205,000 3,000 347,000
4 54,000 30,000 17,000 38,000 216,000 5,000 360,000
5 49,000 33,000 17,000 41,000 212,000 4,000 356,000
6 43,000 31,000 12,000 34,000 196,000 4,000 320,000
7 53,000 32,000 17,000 43,000 221,000 6,000 372,000
8 46,000 33,000 24,000 40,000 186,000 7,000 336,000
9 51,000 -58,000 9,000 7,000 185,000 -14,000 180,000
10 56,000 21,500 25,000 39,500 202,500 3,500 348,000
11 56,000 21,500 25,000 39,500 202,500 3,500 348,000
12 56,000 20,000 21,000 44,000 214,000 2,000 357,000
TOTAL 605,000 262,000 224,000 427,000 2,459,000 28,000 4,005,000
North West
Locality                         
£
Adult
Services             
£
Children
Services               
£
Learning
Disabiliti
es               
£
Mental
Health                 
£
Social Care
Services                 
£
TOTAL     
£
1 1,396 6,804 9,018 19,329 72,766 109,313
2 406 6,804 1,303 37,927 338,077 384,517
3 2,527 6,804 42,413 184,579 236,323
4 4,348 4,796 37,915 199,682 246,741
5 5,698 4,988 38,211 212,758 261,655
6 759 4,797 1,627 49,939 193,626 250,748
7 2,817 4,796 59,821 234,119 301,553
8 10,554 4,796 97,273 182,799 7,204 302,626
9 11,584 12,168 754 63,042 232,980 13,336 333,864
10 11,285 16,710 4,141 57,024 221,263 20,796 331,219
11 23,686 14,913 24,634 180,893 57,701 301,827
12 87,839 20,190 3,936 222,091 290,700 47,831 672,587
13 32,022 32,022
TOTAL 162,899 108,566 20,779 749,619 2,544,242 178,890 3,764,995
North West
Locality                         
£
North East
Locality                        
£
Adult
Services             
£
Children
Services               
£
Mental
Health                 
£
Social Care
Services                 
£
Home
Support     
£
Other           
£
TOTAL     
£
1 13,187 8,071 10,569 12,294 49,952 8,427 109,798 4,808 217,106
2 12,032 8,789 3,582 9,091 42,880 73,558 285,090 1,096 436,118
3 21,425 6,426 4,508 7,572 29,605 76,713 277,793 2,558 426,600
4 12,482 4,153 2,223 16,873 30,022 74,719 290,873 2,923 434,268
5 17,069 10,685 3,218 9,750 53,447 87,187 321,181 1,541 504,078
6 10,687 7,575 4,373 14,542 48,147 76,800 326,698 2,629 491,451
7 13,149 4,503 6,412 21,905 55,807 84,165 362,809 4,290 553,040
8 9,351 9,011 7,230 27,429 58,631 113,755 503,326 2,800 731,533
9 8,914 12,937 5,770 28,958 34,450 118,428 420,088 2,046 631,591
10 10,665 8,985 6,280 27,683 38,918 86,099 254,737 4,842 438,209
11 15,115 7,879 9,800 21,887 39,758 79,279 377,024 2,751 553,493
12 12,745 8,193 13,229 25,238 42,028 96,920 358,412 4,497 561,262
13 165,891 493,738 659,629
TOTAL 156,821 97,207 77,194 223,222 523,645 1,141,941 4,381,567 36,781 6,638,378
North West
Locality                         
£
North East
Locality                        
£
Adult
Services             
£
Children
Services               
£
Mental
Health                 
£
Other           
£
TOTAL     
£
1 6,869 5,164 12,800 6,579 10,496 889 42,797
2 3,401 4,223 7,228 5,775 8,002 796 29,425
3 4,231 6,891 8,791 6,755 9,229 656 36,553
4 3,007 4,827 5,230 8,288 7,947 2,269 31,568
5 3,801 3,348 5,450 7,051 9,240 4,532 33,422
6 3,660 3,937 5,002 11,180 7,207 649 31,635
7 2,077 1,879 6,954 12,542 8,465 1,605 33,522
8 2,447 3,914 6,168 12,599 6,428 1,591 33,147
9 3,517 6,460 8,221 14,474 5,392 1,790 39,854
10 4,663 2,832 7,814 10,241 10,094 1,667 37,311
11 5,211 3,749 5,611 6,717 8,715 2,397 32,400
12 5,098 5,127 8,044 6,407 9,843 3,625 38,144
TOTAL 47,982 52,351 87,313 108,608 101,058 22,466 419,778
BANKAIDE COSTS 2022/2023
OVERTIME COSTS 2022/2023
AGENCY COSTS 2022/2023
EXCESS PART TIME COSTS 2022/2023
Period
Period
Period
Period

Page 117

1
REPORT
Item No: 9
SUBJECT: Resilience Response
TO: Performance, Finance and Audit Committee
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Author(s)
of Report
Kirsty Orr, Head of Planning and Development, NHSL
Ross McGuffie ,Chief Officer North HSCP
DATE: 21st June 2023
1. PURPOSE OF REPORT
1.1 This paper is coming to the IJB Performance, Finance and Audit Committee: 
For approval For endorsement To note
1.2 This paper sets out the actions being taken in response to current whole system
service pressures. 
2. ROUTE TO THE IJB PERFORMANCE, FINANCE & AUDIT COMMITTEE
2.1 This paper has been:
Prepared Reviewed Endorsed
By the command structure in the Health and Social Care Partnership.
3. RECOMMENDATIONS
3.1 The PFA is asked to:
(1) Recognise the whole system Operation Flow 2 plans and implementation
structures set out in the report;
(2) Request future updates on progress.
4. VARIATIONS TO DIRECTIONS
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Background
5.1.1  NHS Lanarkshire stood down its Live Covid Incident in January 2023, however,
the operational pressures emanating from the pandemic recovery have been
pronounced, with NHS Lanarkshire in Black status since 27th July 2022. 
5.1.2 Operation Flow was developed to create a ‘firebreak’ to rapidly reduce hospital
inpatient capacity, then creating the staff capacity to work on service redesign to
bring the system as a whole back into equilibrium. 
Yes No N/A

Page 118

2 
5.1.3 Following the 9-day firebreak, hospital inpatient capacity reduced by around 15%
across Lanarkshire, supporting the system to move from black to red status on 6th
March 2023. 
5.2 Operation Flow
5.2.1 The IJB received an update on Operation Flow at its meeting on 22nd March 2023
and again at the PFA meeting on 19th April 2023. Operation Flow is the whole
system strategic planning approach in Lanarkshire aimed at supporting a sustained
recovery of the entire health and social care system. 
5.2.2 Following two further face to face planning sessions that brought together leaders
from across the whole system, a Task and Finish structure has now been developed
to take forward the key actions agreed for Operation Flow 2 (see appendix 1). 
5.3 Developing and Implementing Operation Flow 2
5.3.1 As system we have been not able to sustain the improvements in the weeks
following the Firebreak period.  However, work does continue to support the
culture and behaviour change required across our Acute sites to improve
efficiency and effectiveness by embedding the flow foundation bundles and
pathways 
5.3.2 We know that establishing and maintaining good flow across our system is key to
the success of Operation Flow 2.  Consequently, we have established a task and
finish group structure which is underpinned by our new 6 step Flow Model
(outlined below and also in Appendix 2) to support delivery of Operation Flow 2. A
project plan (appendix 3) which outlines the key objectives for Operation Flow 2
has been developed in collaboration with colleagues across the system and also
takes account of the learning from Firebreak. 
5.3.3 Operation FLOW 1 involved considerable whole-system development work
undertaken jointly by NHS Lanarkshire, Health and Social Care North Lanarkshire,
South Lanarkshire Health and Social Care Partnership and Scottish Ambulance
Service and this will continue through the duration of Operation Flow 2. 
5.3.4 Five Task and Finish Groups have been established to lead in the development
and implementation of the key elements aligned to the new flow model. The Task
and Finish Groups are accountable to the Executive Flow Oversight Board (EFOB)
which reports to Corporate Management Team (CMT).   
5.3.5 A summary of each of their key high level objectives is described below: 
Task and Finish Group 1: Core Group   
 Provides overview and co-ordination for success 
 Ensures Task and Finish Groups, 2, 3, 4 and 5 are on track for delivery 
 Undertakes weekly performance review in relation to progress of attaining
trajectory milestones across our 23 Acute sites and system
 Develop and describe the OOHs Flow Management / On call model 
 Develop and describes the resource plan for Operation Flow 2
 Ensures escalation to EFOB 
Task and Finish Group 2: Pre-Hospital / Avoiding Admission

Page 119

3 
 Describe the operational model required to reduce demand via the FNC 
 Detail the workforce model required which supports admission avoidance and
direction to other parts of our system 
 Roll out and expansion of consultant connect for SAS to reduce conveyancing to
hospital when it is safe to do so
 Implement the recommendations of the Strategic Review of Hospital @ Home
which supports admission avoidance 
 Development of community access pathways to support people in the community 
Task and Finish Group 3: Pan Lanarkshire Front Door Redesign 
 Undertake a review of the current “as is” pathways across ED, Acute Receiving
and Ambulatory Care to ensure that there is a shared understanding across the 3
sites 
 Undertake a resource review of ED’s shift by shift and complete comparison with
2019 data 
 Develop recommendations which details the Target Operating Model for Font
Door Services across Lanarkshire 
Task and Finish Group 4: Ward and System Flows 
 Establish and embed a NHS Lanarkshire standardised huddle approach and
template which embeds ward, site and system level escalation processes to
support flow 
 Embed all elements of the Flow Foundation Bundle across all inpatient areas
 Embed ward beat as part of huddle and flow foundation bundle 
 Develop a consistent and co-ordinated flow management model for NHS L 
Task and Finish Group 5: Frailty and Off site Beds 
 Develop a Front Door Frailty Rapid Assessment Process
 Develop and describe the Frailty Model for NHS L 
 Scope the “as is” offsite bed model 
 Develop recommendations that outlines the Target Operating Model for offsite
beds to support system flow 
5.3.6 We have also established a Data Governance Group which oversees all aspects
of system development and ensuring that NHS Lanarkshire is compliant with
Public Health Scotland definitions in relation to Urgent and Unscheduled Care. 
5.4 Embedding Best Practice, Accountability and Leadership
5.4.1 We know that to deliver the comprehensive plan we will need to work together to
ensure that there is:
 Cohesive Leadership across the Lanarkshire system 
 Ownership by all Operational Leaders in Acute, Community and Social Care, with
improvement support, to deliver the pace of change required
 Clarified roles and responsibilities to develop and deliver the plan 
 Clear measurable objectives across all elements of the plan to demonstrate the
impact made and flexibility in our approach, if required, to deliver greater effect

Page 120

4 
5.4.2 Progressing improvement work across our system is exceptionally challenging
within our current resource profile, given that our system continues to be in
escalation and full capacity protocols. However, we continue work together across
our system to develop and implement change that will improve the efficiency and
effectiveness of our system. These actions include: 
 Implementation and embedding of the Flow Foundation Bundle to support good
flow across our sectors 
 Embedding structured Hospital Huddles to ensure situational awareness of flow,
impact on patient safety and the actions required to respond to pressure
 Implementation of consistent Escalation triggers and processes ensuring that the
is clarity in roles and responsibilities across our wards, sites, sectors and system
when responded to blockages and barriers to good flow and safety
 Ensuring standardisation of patient flows and dispositions across our system
 Developing and implementing assertive and continuous flow across all our Acute
sites. 
5.5 Revising the Service Models to Build Capacity and Capability
5.5.1 Through learning from the Firebreak and from shared experiences from other
Health Boards across Scotland, we know that there are a number of improvement
actions that will require increased capacity and capability to improve flow and
demonstrate a positive impact on our performance against the 4-hour target and
these include: 
 Reducing demand with Senior Clinical Decision Makers in the FNC and with the
Hospital @ Home Service 
 Increased functional site capacity with an expanded minors area in UHW and 7
day opening of Ambulatory Care units across all 3 sites 
 supporting discharge planning co-ordination with additional administrative support
to wards 
 Increased service improvement support across the whole system 
 Increased flow management teams within the Acute sites 
 Tackling the blocks to flow by opening the discharge lounge over 7 days 
 Augmented data support for Operation Flow 2 and Trakcare and ensuring that we
have access to accurate real time data 
5.5.2 Consequently, we are looking at opportunities for investment through internal
prioritisation processes and working closely with Scottish Government colleagues
around the opportunities for reinvestment to support the project deliverables but
also within the context of a financially sustainable plan for NHS Lanarkshire. 
5.6 Performance and Monitoring
5.6.1 We have established a robust monitoring process for Operation Flow 2. Each of
the Task and Finish Group have developed project plans which outline the tasks
that need to be accomplished to achieve the project goals and this detail is
reported to Task and Finish Core Group each week. The overarching project plan
for Operation Flow 2 provides an overview of progress against each of the high
level objectives for the Task and Finish Groups which is reported to EFOB on a
weekly basis. A copy of the Overarching Plan is in Appendix 3. 
5.6.2 A performance management framework has been established for Operation Flow
2 which is underpinned by objectives and improvement milestones. Performance
improvement trajectories have been developed for the Lanarkshire System and

Page 121

5 
each of the Acute sites. We have established milestones for achievement by 30
June 2023, 31August 2023 and 31 March 2024 (see appendix 4).   
5.6.3 Our key objective it to consistently improve NHS Lanarkshire’s performance
against the 4-hour standard by achieving 70% against the 4-hour access
performance by 31 August 2023 and 90% by 31 March 2024. Crucially, we know
that this will significantly improve the clinical safety and experiences for our
patients as well as health and well-being of our workforce. The impact of the
project actions from each of the Task and Finish Groups will be measured against
the: 
 Weekly 4-hour access performance
 Weekly number 8 hour waits
 Weekly number of 12 hour waits
 Acute site occupancy levels, 
 Ward beat rate achieved / week 
 Discharge lunge use
 Pre-noon discharge rate
 Delayed discharges / week (Acute sites) 
 Delayed Discharge / Week (Community Hospitals) 
5.6.4 A balanced scorecard has also been developed to monitor our progress against
the objectives. In addition, Each of the Task and Finish Groups have developed a
data measurement framework which details the process measures to deliver the
outcome measures. 
6. CONCLUSIONS
6.1 There has been a tremendous whole system effort to plan Operation Flow and to
enact the firebreak at scale and pace. 
6.2 The reduction in occupancy levels across all three sites has allowed NHS
Lanarkshire to move from black to red status on 6th March 2022, following over 6
months in black status. 
6.3 Attention has now moved to make the most of the system decompression to move
forwards with the ambitious change programme identified to ensure the positive
performance improvements can be sustained and indeed further improved over
time. 
7. IMPLICATIONS 
7.1  NATIONAL OUTCOMES 
This relates to all nine national outcomes. 
7.2 ASSOCIATED MEASURE(S) 
A weekly performance framework has been developed to track progress. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT

Page 122

6 
Risk IJB 17/22 sets out the unscheduled care challenges currently being faced in
the Lanarkshire system. 
7.5 PEOPLE 
The Strategic Planning Group has increased in frequency to quarterly throughout
the pandemic to support engagement with staff, service users and carers and staff
roadshows have also recommenced on a quarterly basis. 
7.6  INEQUALITY & FAIRER SCOTLAND DUTY 
Yes  No  N/A 
8. BACKGROUND PAPERS 
None. 
9. APPENDICES 
Appendix 1: Operation Flow 2 structure
Appendix 2: Flow Model
Appendix 3: Programme Plan
Appendix 4: Performance Plan 
.............................................................................
CHIEF OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact
Ross McGuffie on telephone number 01698 752 591.

Page 123

7 
Appendix 1: Operation Flow 2 structure

Page 124

8 
Appendix 2: 6 Step Flow Model

Page 125

9 
Appendix 3: Project Plan

Page 126

10 
Appendix 4: Improvement Milestones

Page 127

1
REPORT
Item No: 10
SUBJECT: Prisoner Healthcare
TO: Performance, Finance & Audit Committee
Lead
Officer for
Report:
Maggs Thomson, Head of Head, North HSCP
Author(s) of
Report
Jim Duffy, General Manager, Adult Health Services Unit, North
HSCP
DATE: 21 June 2023
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
For approval ☐ For endorsement ☐ To note ☒
1.2 This paper sets out an overview of the Prisoner Healthcare service within North
Lanarkshire
2. ROUTE TO THE BOARD
This paper has been:
Prepared By: ☒ Reviewed By: ☒ Endorsed By: ☐
Prepared by J Duffy General Manager, Adult Health Services Unit, North H&SCP.
Reviewed by M Thomson

Page 128

2 
3. RECOMMENDATIONS
3.1 It is recommended that the IJB for Performance, Finance and Audit Committee
supports;
(1) The creation of a Project Board, overseeing the implementation of
improvement plans relating to HIS recommendations, internal Service Review
actions and MATS Standards.
(2) The ongoing funding and support for the Fixed Term Senior Improvement
Manager position.
(3) The work associated with locally identified Milestones for the service, as noted
in the Annual Delivery Plan for 2023/24 as per summary table below
Table 1- Annual Delivery Plan 2023/24 Summary 
Summary We aim to deliver against 2022 HIS Inspection Recommendations and
against all remaining actions from our internal Service Review in 2022,
and to deliver MATS in Justice. We aim to end 2023/24 with plans for
sustainable performance and future delivery against the changes.
Q1 1. Senior Service Improvement manager in post and inducted.
2. Measurable advancement evident in the delivery of the 6 priority
recommendations from the 2022 HIS inspection.
3. Advancement in the acquisition of a LES for GP services.
4. Improvement Plan in place for HIS recommendations and actions
from NHSL service review, feeding into established Performance
Review Processes.
Q2 1. LES agreed, or advancement on contingency plan if LES
unsuccessful.
2. Measurable advancement and delivery of 6 HIS priority areas.
3. Measurable advancement in NHSL service review actions.
4. New Team leader in post and Return to full shift nursing coverage
(9pm).
Q3 1. Host return visit/inspection by HIS and report on delivery against 6
priority recommendations including GP services.
2. Workforce Model review planned and date identified to commence
work.
3. Measurable improvement in the management of LTC in the prison
population under the newly created structure with nursing staff and GP
services jointly leading.
4. Established Programme Board for justice related services with
prison healthcare a central component in conjunction with MATS
standards.
Q4 1. Measurable delivery of all actions from the NHSL service review.
2. Measurable delivery and maintenance of all recommendations from
HIS inspection.
3. Consultative and preparation work complete for Workforce Model
review and plan in place to begin implementation.

Page 129

3 
4. VARIATIONS TO DIRECTIONS? 
Yes ☐ No ☐ N/A ☒ 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Background
5.1.1 Responsibility for the provision of healthcare in prisons transferred from the
Scottish Prison Service (SPS) to the NHS in November 2011 and for HMP Shotts in
Lanarkshire, it is now the responsibility of the North Lanarkshire H&SCP. HMP Shotts,
a 538 place, maximum security prison for convicted adult males serving a sentence of
four years or longer has a healthcare team that comprises of three sub-teams teams
of Primary Care team, Addictions Team and Mental Health Team. 
5.1.2 It is an isolated professional working environment, and there are significant
cultural challenges related to partnership working with the Scottish Prison Service
(SPS).  The previous permanent on-site Senior Nurse model has been replaced with
a Senior Nurse and Service Manager ‘in reach’ model providing regular presence on-
site and work with the Teams. 
5.1.3 Over the last 24 months the healthcare team has experienced significant and
sustained staff shortages across all disciplines. This has impacted on the team’s ability
to provide adequate staffing and maintain a safe skill mix. This included the lack of GP
cover from 1:30pm onwards. 
5.1.4 Due to the apparent challenges, the Nurse Director commissioned a ‘deep dive
Service Review to be undertaken. This was completed in March 2022 and an action
plan was developed identifying planned improvement actions. 
5.2 Her Majesty’s Inspectorate of Prisons for Scotland Inspection 
5.2.1 Her Majesty’s Inspectorate of Prisons for Scotland (HMIPS) undertook an
inspection of HMP Shotts from 09- 22 May 2022, supported by Healthcare
Improvement Scotland (HIS) who reviewed Prisoner Healthcare under Standard 9:
Prisoner Health & Wellbeing. (HIS noted that an internal Service review had taken
4. Commencement of work on plan to provide sustainability and
maintenance of the delivery of HIS recommendations and Service
Review actions (audit cycle, reporting mechanisms etc.).
5. Measurable improvement in service performance and compliance as
agreed in performance framework/KPI process.

Page 130

4 
place ahead of their inspection and commented that this had been an area of good
practice). 
5.2.2 Resultantly, the nurse staffing recruitment and retention issues and associated
subsequent impact on patient care, resulted in a grading of ‘Poor’ for NHS Lanarkshire.
Whilst the report recognised the considerable efforts made to support the healthcare
needs of patients in HMP Shotts, HIS noted;
 Five quality indicators were rated as satisfactory,
 Six quality indicators were rated as generally acceptable
 Five quality indicators were rated as poor.

5.2.3 There were 12 examples of good practice and 22 recommendations for
improvement which include 6 priority recommendations. The Inspection Report is
listed in Section 8..
5.3 Progress to Date
5.3.1. As noted in the full report, there were 22 Recommendations. The present status
of progress is detailed within Table 2 and a breakdown of these recommendation are
detailed within Appendix 1 – HIS Review Recommendations Update .
Table 2. Current Position on HIS Recommendations 
Criteria No of
Recommendations
Current Position on Open
Recommendations
RED AMBER GREEN
Total
Recommendations
22 0 
Open
Recommendations
16 0 13 3
Closed/Complete
Recommendations
6 0  6 
5.4 Service Review Model
5.4.1 The Internal NHSL Service Review produced an action plan with 32 Actions.
The present status of progress of these actions are detailed within Table 3 and a
further breakdown of these actions are detailed within Appendix 2 -Service Model
Review Update.
Table 3. Current Position on Service Review Actions 
Criteria No of Actions Current Position on ‘Live’ actions
RED AMBER GREEN
Total Actions 32 0 
Open/Ongoing
Actions
10 0 4 6

Page 131

5 
Closed/Complete
Actions
22 0  22 
5.4.2 The implementation of the HIS recommendations and the actions from the
Service Review has been formally supported by North Lanarkshire H&SCP with
fixed-term funding for a Senior Improvement Manager, who will oversee and co-
ordinate Improvement work to ensure the delivery of all Recommendations and
Actions.
5.4.3 Additionally, it is planned that the work required in conjunction with associated
work (specifically MATS in Justice) will be managed under the oversight of a
Programme Board.
5.4.4 The Senior Service Improvement manager is now in post and is currently
developing an amalgamated Implementation and Improvement plan which will be
presented at the initial meeting of the Programme Board in June 2023.
5.4.5 Work is ongoing on staff recruitment and retention with a continued plan for
Recruitment events, an application for a Secure Environment Allowance to S.T.A.C.
and a current piece of work to create a Local Enhanced Service for the provision of
GP cover, with one interested practice currently engaging in fact-finding and
observation/participation in GP work as a way of assessing compatibility. 
6. CONCLUSIONS
6.1 The management of Service Improvement and MATS standards is essential, and
it is imperative that the improvement agenda is supported and implemented.
6.2 In order to meet the healthcare needs of prisoner patients, it is essential that the
detailed recommendations and actions, including an improved workforce model are
implemented.
6.3 The continued endorsement of and support for the incumbent Senior Service
Improvement Manager post (Fixed Term for 18 months) is central to success in
delivery.
6.4 achievement of our key Q1-Q4 Milestones in the Annual Delivery plan is
essential to evidence the required improvement.

Page 132

6 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES Link(s) to National Health & Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services
☒
Health and Social Care Services contribute to reducing health inequalities ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services
☒
7.2 ASSOCIATED MEASURE(S)
 HIS Standard 9: Prisoner Health & Wellbeing.
 The identified actions and service and quality requirements as noted in the
internal Service Review.
 Compliance with MATS Standards
 Generic management standards and performance requirements (including
Financial balance and staff governance measures). 
7.3 FINANCIAL
7.3.1 The Summary finance position for Prisoner Healthcare to the end of reporting
year 2022/23 (and subsequently updated to present for the purposes of this report) is
illustrated below. (Full detailed accounts are available).
7.3.2 There was an overspend mainly in non-pay which was largely characterised by
the costs associated with the supply of medicines which when isolated as a cost on
its own experienced an overspend of circa £170k in 2022/23. The supply of Buvidal
is a significant contributory cost within this. 
Table 4- Summary Financial Position 
Nhsl Prisoner
Healthcare Month 12 2022/2023 
Report Refreshed On 18-
May-23

Page 133

7 
Annual
Budget 
YTD
Budget  YTD Actuals
YTD
Variance 
Period
Budget
Period
Actuals
Period
Variance 
Pay  1,347,509   1,347,509  1,325,641  21,868   107,431  120,768  (13,337) 
Non Pay  436,188   436,188  582,202  (146,014)   36,349  212,103  (175,754) 
Nhsl Prisoner Healthcare
Total 1,783,697 1,783,697 1,907,844 (124,147) 143,780 332,871 (189,091) 
Staffing cost variances due to staffbank and agency nurse cover were largely
tempered by the high nursing vacancy factor, as recruitment and retention of nursing
staff continues to be a challenge. Pays therefore show as an underspend for
2022/23. 
7.3.3 This paper has been reviewed by Finance: 
Yes ☒ No ☐ N/A ☐ 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details
Current Risk Level Risk Owner
1.  Healthcare
Provision for HM
Prison Shotts:
Recruitment &
Retention issues
mean that we are
unable to provide
cover between
18.00 and 21.00
hrs. A safe
alternative is in
place until staffing
levels improve.
High J Duffy
Relevant Risk Register
Details
Current Risk Level Risk Owner
2.  Illicit substance
misuse in prisoner
group resulting in
Ambulance
conveyance to ED
and admission to
acute hospital.
Low J Duffy
Relevant Risk Register
Details
Current Risk Level Risk Owner
3.  Nurse Staffing
levels at HM Prison
Medium J Duffy

Page 134

8 
Shotts: Turnover
and vacancy factor
is high and this has
resulted in costs
for Staffbank and
agency nurse
cover. Actions and
mitigation in place
to address this
issue.   
7.5 ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken. 
Objectives Further Details
☒ Involve stakeholders in the development
work aimed at achieving the national
outcomes
A programme Board is being
established for prisoner healthcare
and MATS standards. Multiple
stakeholders will be included.
Discussion is ongoing on how best
to incorporate prisoner/family
inclusion.
☒ Provide stakeholders with information on
how to get involved
Information on engagement will
emerge form Programme Board
actions
□ Ensure a diverse range of engagement
and participation and opportunities are in
place to suit different needs
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Measure how well we involve community
stakeholders in the planning, design
and delivery of our services
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Develop participation guidelines to
ensure a common understanding and set of
expectations for both stakeholders and
partnership staff
Not yet in place but to be developed
at and Overseen by Programme
Board
□ Support engagement planning and
participation in localities, taking account of
Not yet in place but to be developed
at and Overseen by Programme
Board

Page 135

9 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes ☐ No ☒ N/A ☐ 
EQIA added to website: 
Yes /
Date
added
☐ No ☐ N/A ☒ 
8. BACKGROUND PAPERS
Paper 1 HMIPS-HMP Shotts Report on Full Inspection 
9. APPENDICES
Appendix 1- HIS Review Recommendations Updated 17th May 2023
Appendix 2- Service Model Review Update 17th May 2023 
CHIEF ACCOUNTABLE OFFICER (or Depute) 
Members seeking further information about any aspect of this report, please contact
the following;
Maggs Thomson, maggs.thomson@lanarkshire.scot.nhs.uk
other engagement activity and local plans
across the Community Planning
Partnership

Page 136

10

Page 137

11 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number 
2 Report Title 
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed

Page 138

Paper 1 
Report on HMP Shotts 
Full Inspection
9-20 May 2022

Page 139

CONTENTS 
Introduction and Background
Key Facts
Overview by HM Chief Inspector of Prisons for Scotland
Human Rights Based Approach Overview
Summary of Inspection Findings 
Standards, Commentary and Quality Indicators
Standard 1 Lawful and Transparent Custody
Standard 2 Decency
Standard 3 Personal Safety 
Standard 4 Effective, Courteous and Humane Exercise of Authority
Standard 5 Respect, Autonomy and Protection Against Mistreatment
Standard 6 Purposeful Activity
Standard 7 Transitions from Custody to Life in the Community 
Standard 8 Organisational Effectiveness
Standard 9 Health and Wellbeing
ANNEXES
Annex A Summary of Recommendations 
Annex B Summary of Good Practice 
Annex C Summary of Ratings 
Annex D Prison Population Profile on 
Annex E Inspection Team 
Annex F Acronyms used in this Report 
EVIDENCE REPORT 
The full inspection findings and overall rating for each of the quality indicators.

Page 140

1 
INTRODUCTION AND BACKGROUND 
This report is part of the programme of inspections of prisons carried out by
Her Majesty’s Inspectorate of Prisons for Scotland (HMIPS).  These inspections
contribute to the UK’s response to its international obligations under the Optional
Protocol to the UN Convention against Torture and other Cruel, Inhuman or
Degrading Treatment or Punishment (OPCAT).  OPCAT requires that all places of
detention are visited regularly by independent bodies known as the National
Preventive Mechanism (NPM); which monitor the treatment of and conditions for
detention.  HMIPS is one of 21 bodies making up the NPM in the UK. 
Her Majesty’s Chief Inspector of Prisons for Scotland (HMCIPS) assesses the
treatment and care of prisoners across the Scottish Prison Service (SPS) estate
against a pre-defined set of Standards. These Standards are set out in the
document ‘Standards for Inspecting and Monitoring Prisons in Scotland’, published in
May 2018 which can be found at
https://www.prisonsinspectoratescotland.gov.uk/standards. 
The Standards reflect a rights based approach to an independent inspection of
prisons in Scotland and are also designed to provide information to prisoners, prison
staff and the wider community on the main areas that are examined during the
course of an inspection.  Our report provide assurance to Ministers and the public
that inspections are conducted in line with a framework that is consistent and that
assessments are made against appropriate criteria. While the basis for these
Standards is rooted in International Human Rights treaties, conventions and in
Prison Rules, they are the Standards of HMIPS. This report and the separate
‘Evidence Report’ are set out to reflect the performance against these standards and
quality indicators. 
HMIPS assimilates information resulting in evidence-based findings utilising a
number of different techniques. These include: 
 Asking the Governor or Director in Charge for a self-evaluation – summary of
their progress against previous recommendations, the challenges they face
and the successes they have achieved.
 Obtaining information and documents from the SPS and the prison inspected.
 Shadowing and observing SPS and other specialist staff as they perform their
duties within the prison.
 Interviewing prisoners and staff on a one-to-one basis.
 Conducting a pre-inspection health and wellbeing survey of prisoners, and
focus groups with both prisoners and staff.
 Observing the range of services delivered within the prison at the point of
delivery.
 Inspecting a wide range of facilities impacting on both prisoners and staff.
 Attending and observing relevant meetings impacting on both the
management of the prison and the future of the prisoners such as Case
Conferences.
 Reviewing policies, procedures and performance reports produced both
locally and by SPS Headquarters (SPS HQ) specialists.

Page 141

2 
HMIPS is supported in our work by inspectors from Healthcare Improvement
Scotland (HIS), Education Scotland, Scottish Human Rights Commission, the Care
Inspectorate, where appropriate the Children and Young People’s Commissioner for
Scotland, and guest inspectors from the SPS. 
The information gathered facilitates the compilation of a complete analysis of the
prison against the standards used. This ensures that assessments are fair,
balanced and accurate.  In relation to each standard and quality indicator, inspectors
record their evaluation in two forms: 
1. A colour coded assessment marker 
(APS TO INSERT) 
2. A written record of the evidence gathered is produced by the inspector allocated
each individual standard.  It is important to recognise that although standards are
assigned to inspectors within the team, all inspectors have the opportunity to
comment on all findings at a deliberation session prior to final assessments being
reached. This emphasises the fairness aspect of the process ensuring an unbiased
decision is reached prior to completion of the final report. 
This report provides a summary of the inspection findings and an overall rating
against each of the nine standards. The full inspection findings and overall rating for
each of the quality indicators can be found in the ‘Evidence Report’ that will sit
alongside this report on our website.

Page 142

3 
Key Facts
Location
HM Shotts is situated in the countryside, south of the M8 motorway near the
Lanarkshire village of Shotts. 
Role 
HMP Shotts is a maximum security prison for long-term adult male prisoners. It also
houses a national facility within its boundaries, the National Integration Centre (NIC),
which holds adult male prisoners who are in the initial stages of sentences of 8 years
or over and prepares them for the eventual movement to mainstream establishments 
Accommodation 
There are two main residential units; Lamont Hall and Allanton Hall. There is also a
14 cell Separation and Reintegration Unit (SRU). All accommodation is designed for
single occupancy and each cell has an integrated toilet and shower. 
Design capacity 
The design capacity is 538. 
Date of last inspection:  21 August – 1 September 2017 
Healthcare provider:  NHS Lanarkshire 
Learning provider:  Fife college

Page 143

4 
Overview by HMCIPS 
The Vision for Justice in Scotland 2022 aims to have effective, modern
person-centred and trauma-informed approaches to justice in which everyone can
have trust. 
Her Majesty’s Prison (HMP) Shotts was completely rebuilt in 2012 and has been
well designed, with single cell accommodation for 553 and facilities fit for its purpose
of holding long term adult male offenders. The prison was still in good physical order.
The prison seeks to provide a secure, safe, caring and productive environment, while
providing opportunities for offenders to come to terms with their sentences and
address their offending behaviour. 
HMP Shotts was the first full inspection where HMIPS’ health and wellbeing survey
was completed prior to the inspection; this provided valuable information to guide the
focus of the inspection. 
Like the rest of the SPS, HMP Shotts has faced significant challenges over the last
few years from the global pandemic. Staff shortages were evident across the
establishment with healthcare delivery, access to employment, staff training, staff
and prisoner engagement and evening activities detrimentally impacted. This was
compounded by a period of significant incidents prior to the inspection, mostly
substance related, that had affected the confidence of the prison. The national
introduction of photocopying of prisoner mail, however, has led to a clear and
welcome reduction in drug related incidents, and prisoners also reported they felt
safer. 
This report identifies a number of areas of good performance which are worth
celebrating, and which I hope will be taken up by other prisons in Scotland; for
example good use of multi-disciplinary approaches to substance misuse, health
promotion, and assisting with induction and adjustment to prison. We also saw good
use being made of the Prisoner Information Channel. 
Most significantly, however, HMP Shotts is the first public sector prison in Scotland
to install a digital ‘kiosk’ system. Used in many other jurisdictions, the positive
benefits are clear; the system enables prisoners to exercise control and
independence (and reduces paperwork for staff) by electronically choosing their
meals, booking their own visits, buying canteen goods and checking their spend
balance. HMIPS welcomes this initiative and looks forward to seeing this innovation
extended into the cellular accommodation and rolled out across the estate. 
HMP Shotts houses the National Integration Centre (NIC) which holds approximately
60 adult male offenders who are in the initial stages of a long or life sentence and
prepares them for eventual movement to mainstream prisons. We saw clear
evidence of constructive relationships between staff and prisoners, resulting in
suitably designed activities for each prisoner.  As in the 2017 report, it was
encouraging to see the operation of a Personal Officer scheme at its best.

Page 144

5 
The staff who worked in the SRU demonstrated a high level of commitment and skill
in working with often troubled and sometimes challenging prisoners.  Good team
working was evident, with investment in relationships producing positive results. 
Across the prison the Integrated Case Management (ICM) system was well
established with a clear focus on identifying and meeting the needs of individual
prisoners. Staff responsible for the operation of ICMs made effective arrangements
to promote the involvement of all prisoners and, where appropriate, family members. 
Despite staffing constraints, HMP Shotts are to be commended for increasing the
offending behaviour programme delivery during COVID-19 and for the resumption of
Education and chaplaincy activities. We would nevertheless now strongly urge the
early resumption of a return to a full regime. 
The report also highlights other areas where improvements can be made. 
Unfortunately, the significant and sustained pressures on healthcare staff and the
detrimental impact on patient care resulted in a grading of ‘Poor ‘for NHS
Lanarkshire but we nevertheless recognise the considerable efforts made in difficult
circumstances by staff within HMP Shotts and the North Lanarkshire Health and
Social Care Partnership (HSCP) to support the healthcare needs of patients in HMP
Shotts. 
Despite the well-established ICM process, the waiting list for prisoners to progress to
the National Top End (NTE) meant prisoners were delayed in progressing through
their sentence.  This problem is not exclusive to HMP Shotts and must be addressed
by the SPS. 
Echoing the 2017 inspection report, we were concerned that long term prisoners
were released back into the community from HMP Shotts without any formal
opportunity to develop key life skills as part of preparation for release during their
sentence. Prisoners due for release from the prison after many years also reported
that they lacked confidence about important parts of their integration plans,
especially housing options and access to mental health support. 
We were impressed by the responsiveness of HMP Shotts management team to
issues raised during the inspection, which provides hope for early successes in
returning to a full regime, staff and prisoner engagement, re-energising the equality
and diversity (E&D) agenda, and the development of a pre-release life skills
opportunity. 
We were concerned, however, that the Senior Management Team (SMT) and a
number of management posts below that had been occupied on a temporary
promotion basis for over two years; this was not conducive to stability and longer
term planning so we urge the SPS to secure some more permanent arrangements as
soon as possible. We were also aware that there had been tensions prior to our
inspection between the trade union side and the SMT, which had been de-stabilising;
it was encouraging to hear both sides say relationships were improving and we
welcome continued engagement towards shared goals.

Page 145

6 
We made 65 recommendations in total, but we would encourage a focus by the SPS
on firstly stabilising a permanent management team structure and on the following
key recommendations: 
Recommendation 14: The Violence Reduction Group should meet more regularly
to review violence reduction and ensure actions are taken, and the Violent Incident
Review (VIR) form submitted to Intelligence Management Unit (IMU) following a
Violent Incident Review Panel should be taken to the Violence Reduction Group
meeting for consideration as required by the strategy document 
Recommendation 15: SPS Anti-bullying Strategy ‘Think Twice’ requires to be  re-
launched to overcome the identified deficits e.g. only 40% of the staff are
trained. Posters should be replenished across the establishment and a re-audit of
incidents should take place to ensure all incidents of bullying, intimidation or
harassment are investigated and taken seriously 
Recommendation 21: HMP Shotts should increase the C&R competency of staff to
the accepted level as a priority. 
Recommendation 22: HMP Shotts must ensure that all planned removals are
recorded unless there is reasonable mitigation. 
Recommendation 33: SPS HQ should review the policy for implementing a national
waiting list for access to programmes and its capacity for delivering programmes
against demand to ensure there is no detrimental effect on the care of individuals in
custody or their ability to progress. 
Recommendation 35: HMP Shotts should continue to support ICM staff to address
the backlog and bring all case conferences up to date. 
Recommendation 41: HMP Shotts should prioritise re-energising the E&D agenda,
including regular meetings of the E&D committee with prisoner representation,
development of an E&D action plan, more systematic monitoring of data to avoid
unintentional bias with employment, education and discipline, etc., and provide
comprehensive training for the E&D Manager. 
Recommendation 44: North Lanarkshire HSCP must ensure that all prisoners
transferred to HMP Shotts are reviewed by a nurse before being admitted into the
prison. 
Recommendation 48: North Lanarkshire HSCP must revise without delay, the
process in place when identifying long term health conditions and provide assurance
that patients are reviewed in line with what is equitable in the community to address
health inequalities. 
Recommendation 52: North Lanarkshire HSCP as a matter of urgency must review
the medical cover available in the afternoons to:
(i) ensure the risk to patients is reduced.
(ii) support nursing staff in dealing with emergency situations.

Page 146

7 
Recommendation 57: As a priority North Lanarkshire’s HSCP must action the
recommendations made in their service review regarding pharmacy provision and
support to provide a service equitable with the community 
Recommendation 62: NHS Lanarkshire HSCP must ensure that all staff managing
complaints receive training to ensure that all complaints are correctly managed. 
Recommendation 65: North Lanarkshire HSCP must demonstrate implementation
of recommendations from service review and provide clear pathways to support staff
on site in HMP Shotts in the absence of senior staff. 
Finally, we would like to thank all the staff, partners and prisoners in HMP Shotts for
their time and commitment to the inspection.

Page 147

8 
Human Rights Based Approach Overview 
HMIPS is a Human Rights organisation. As such, we ground all of our inspections in
Human Rights principles. Our standards are written with the international human
rights framework in mind, and our inspectors apply these standards through a human
rights based approach. 
The human rights-based overview of the inspection of HMP Shotts follows the
PANEL headings, illustrating how human rights are applied to the inspection as a
whole. This overview is not exhaustive of all human rights observed and engaged,
but is intended as a brief synopsis of the implementation of a human rights-based
approach in HMP Shotts. 
HMIPS’ human rights-based approach to inspection is a critical element of ensuring
both that the human dignity of the prisoner is upheld and that prisons are places of
productive, positive and useful education, work and interaction, leading to better
outcomes in reducing recidivism and keeping our communities safer. 
Overview 
While there may not have been sufficient human rights language built into policies
and actions at HMP Shotts, it was clear that the establishment respected basic
principles of human rights in their day-to-day outcomes. This was pleasing to
observe. 
As we will go onto report, the establishment did not have adequate human rights
based infrastructure built into their procedures. Prisoners were not routinely
consulted on matters that affected their lives and there were only very early signs of
a participatory model returning to HMP Shotts, post COVID-19. 
The Governor and Dep. Governor exhibited a strong grip of human rights principles,
dealing with human rights and equality matters in an appropriate, swift and effective
manner when they reached them. Due to a mix of high staff turnover, capacity issues
and the pandemic, this approach had unfortunately not trickled down to middle and
front line managers who demonstrated gaps of experience and competency of these
matters. This was no fault of the personnel in question, but a reflection of the need of
the establishment to run up to date and robust training to all staff, and HMIPS would
encourage the SPS and HMP Shotts to do so. 
The SPS have a positive obligation under article 2 of the ECHR right to life, and the
CPT statement of principles reinforced that in the context of COVID-19 “The basic
principle must be to take all possible action to protect the health and safety of all
persons deprived of their liberty. Taking such action also contributes to preserving
the health and safety of staff.” 
HMIPS do not underestimate the strain COVID-19 placed on establishments. It was
right and proper that protecting the health and safety of both prisoners and staff took
priority over certain functions of prison management. We now expect prisons to put
in place mechanisms to restore regime, meaningful activity and engagement at pace.
Too often during the course of this inspection, inspectors were told that activities had

Page 148

9 
been paused due to the pandemic, without the accompanying rationale, risk
assessments or mitigations we would expect. As we will go on to report, prisoners
need to be consulted, feel empowered and have meaningful say over their lives. 
With cancelling of Prisoner Information and Action Committees (PIACs), for example,
this minimised the opportunity for this to occur. To the establishment’s credit, it
seemed various activities we would expect were beginning to be reinvigorated, but
this was not happening at the sort of pace inspectors would like to see. 
Overall, HMP Shotts was an establishment that respected the basic foundations of a
human rights approach in their outcomes. HMIPS would encourage the
establishment to go further, embedding the culture within staff of all levels, and
establishing a firmer grip of human rights and equality throughout their processes. 
PANEL 
Participation 
“Prisoners should be meaningfully involved in decisions that affect their lives” 
Despite a background of a good participatory model in the past, which HMIPS have
previously been pleased to report – disappointingly, at the time of inspection
HMP Shotts demonstrated neither consistent nor robust examples of prisoner
participation. 
PIACs can be a good opportunity to meaningfully involve prisoners in decisions that
affect the prison. Unfortunately, these were not utilised at HMP Shotts. While there
was a plan to re-establish a PIAC model, they had been suspended throughout the
pandemic which significantly hampered prisoner’s ability to feel that their voice
mattered. It was also noted by inspectors that the National Induction Presentation did
not cover PIACs, which meant a key vehicle for prisoners to be represented was not
being brought to the attention of newly arriving individuals. 
While staff and prisoner relationships were good, it was clear to inspectors that
prisoners in general did not feel that their opinions, views and thoughts were a
priority to staff in decision making. HMIPS encourages HMP Shotts to develop their
PIAC model further. While it does not involve cumbersome work, a good PIAC model
can greatly influence the participatory success of an establishment and help make
prisoners feel heard and engaged. 
If the establishment had concluded that a formal PIAC model was unachievable due
to the pandemic, HMIPS would have hoped to see more informal, yet meaningful,
attempts at consultation by staff to mitigate this. We saw no such evidence. 
The only exception to this was the good practice demonstrated by the library team
who actively sought feedback on the library stock, rules, service and environment.
The library assistant engaged prisoners who attended the library, and importantly,
those who didn’t by seeking feedback on the halls. She displayed the feedback
quarterly and reported back to all service users what had been changed as a result
of opinions and views gathered. Inspectors were impressed by this approach and it

Page 149

10 
represented very good practice indeed. HMIPS would encourage HMP Shotts to take
elements of this practice and incorporate it throughout the prison. 
Inspectors marked the E&D provision of the establishment as poor in QI 8.1. This
was for three main reasons: 
1) The E&D Committee had been suspended for a prolonged period of time and had
only just begun to be reinvigorated. E&D concerns do not cease due to the pandemic
and it is incumbent on the establishment to actively ensure those with protected
characteristics and the most vulnerable are not being disproportionately affected by
prison rules, especially during a pandemic. Inspectors were not satisfied that HMP
Shotts demonstrated they had the appropriate mechanisms in place to assess if this
was occurring. 
2) There was a lack of awareness and competency amongst staff of their obligations
concerning E&D, including members of the E&D Committee. The Committee were
well intentioned, but did not have sufficient training to perform their role. The E&D
Manager was being supported by a member of the SMT, but disappointingly had
received no training in E&D matters. It is important that prison staff receive E&D
training on how to respect the rights and meet the specific needs of detainees in
situations of vulnerability, and the skills necessary for working with them. Rule 75 of
the Mandela Rules is clear that the prison administration has to ensure the
continuous provision of in-service training courses with a view to maintaining and
improving the knowledge and professional capacity of its personnel, after entering on
duty and during their career. 
3) There was no local action plan, strategy or policy. What intentions the Committee
were able to provide did not include focussing on systemic issues vulnerable
individuals may be experiencing and were instead more focussed on awareness
raising. HMIPS would expect to see a combination of both approaches in the
Committee’s plans. 
There had also been no outreach to prisoners to have a prisoner representative on
the E&D Committee. This is a key part of ensuring minority groups within an
establishment are represented. Although inspectors were told this was in process
and would hopefully be occurring shortly. 
Inspectors found a lack of awareness among prisoners of available processes where
they could influence decision-making. 
In general, it was clear to inspectors that participation had not been a priority for the
prison in recent times. There were very early signs of a participatory model returning
to HMP Shotts, but this must be developed further to embed a culture and
meaningful involvement of prisoners in decision making. 
Components to the principle of participation include that it must be active, free and
meaningful and give attention to issues of accessibility, including access to
information in a form and a language that can be understood. HMIPS would expect
that any barriers to participation are identified and that those prisoners would be
assisted to overcome them in order to meaningfully participate.

Page 150

11 
Accountability 
“There should be monitoring of how prisoner’s rights are being affected as
well as remedies when things go wrong” 
There was a framework of administrative accountability in the prison. However,
effective accountability based on human rights standards were not consistent at the
time of the inspection. This is not to say that human rights were readily ignored;
however reference to standards, rules and human rights-based criteria were minimal. 
HMIPS found prisoners had little faith in the complaints system and a low level of
confidence. On review of PCF1 and PCF2 complaints, inspectors found responses to
be timely, robust and appropriate. In particular, PCF2 responses were worthy of
mention, the Governor took time to investigate matters diligently and provided full
responses to those submitting complaints. The Governor (or Deputy Governor) 
would frequently meet with prisoners who had submitted PCF2 complaints to discuss
their concerns and follow up with a written note. HMIPS were pleased to see the
senior management of HMP Shotts took complaints seriously and dealt with them
robustly. 
That said, the establishment should take more steps to recognise the disconnect
between prisoners and the complaints system. Prisoners need to be assured that
their voice is listened to and that authorities are accountable when things go wrong.
Despite the process appearing robust when complaints were received, more effort
should be taken to provide prisoners with confidence in the process. 
More widely, HMIPS have concerns about the extent to which the SPS complaints
matches the best practice model articulated by the Scottish Public Services
Ombudsman, but HMP Shotts implemented the current system effectively. 
However, in line with our remarks above around the E&D processes at HMP Shotts,
inspectors did have concerns around the use of equality and diversity form (EDF)
complaints. An EDF acts as an addendum to a PCF complaint where the complainer
believed the issue to concern an E&D matter. Where such a form was attached, the
complaint was sent to the E&D manager to investigate and reported back separately.
These complaints should be reviewed by the E&D Committee to identify systemic
issues that may be going wrong and address them prison-wide. While not unique to
HMP Shotts, inspectors found this process to be lacking. The process of dealing with
an EDF complaint did not differ in any clear way, in either process or outcome, from
a standard PCF complaint – rendering it without value. HMIPS would strongly
encourage SPS HQ to re-examine processes and procedures in place around E&D
complaints. 
Internal audits from the establishment were mixed, but mostly positive. Compliance
processes appeared to be highly efficient and well managed. The establishment had
taken decisive action to address the areas of poor performance identified in the
previous HMIPS inspection report. Of some concern was the PRL audit around E&D
which suggested a 100% compliance rate. This was not in line with inspector’s
findings and we would suggest HMP Shotts review their internal reporting.

Page 151

12 
NON-DISCRIMINATION 
“All forms of discrimination must be prohibited, prevented and eliminated. The
needs of prisoners who face the biggest barriers to realising their rights
should be prioritised.” 
Non-Discrimination requires the duty bearer to go further than not actively
discriminating – it is not a passive duty but an active one, to make deliberate efforts
to prevent discrimination from occurring in all forms. In this regard, inspectors saw
positive examples from HMP Shotts in almost all of our standards. 
Induction material was provided in a number of different languages and the
establishment had a good procedure in place for use of translation services where
necessary. The induction officer and the librarian had a good working relationship
where she would advise the library of any arriving prisoners who spoke a foreign
language, allowing the library to source material which the prisoner could access. 
The library in general had a good selection of foreign language books, although it
was disappointing to hear that the main supplier of foreign books to the library had
recently gone out of business. The library was actively seeking a new supplier and it
is hoped this can be achieved without delay. 
Foreign national prisoners reported feeling safe and having their basic needs met. 
A personal emergency evacuation plan (PEEP) list was provided and the
requirements of individuals spoken to confirmed they should be on the list. Officers
demonstrated good knowledge of the individuals and the background behind their
requirements. Accessible cells were of a good standard and met the needs of those
occupying them. 
In general, prisoners were supported to practice their religion and afforded the
appropriate faith based meal by the Kitchen. Inspectors were informed that HMP
Shotts had previously had a policy whereby Jewish prisoners requesting a Kosher
meal were required to prove their religious heritage to be eligible for a Kosher meal.
This was poor practice, and HMIPS are pleased to hear it has been overturned by
the current prison administration. Inspectors were informed of an occasion where the
previous policy had mistakenly been applied by a member of staff, and we would
encourage the establishment to ensure all staff are up to date with policy to ensure
this is not repeated. The chaplaincy was excellent and, despite staffing issues, were
supporting prisoners of all faiths and none. 
Access to “enhanced work parties” which paid slightly more and were for low risk
prisoners was not equal for protection and non-protection prisoners. HMIPS
recognise the difficulty in allocating work in a large prison with a varied population,
but we encourage the establishment to try to afford equitable access across the
population.

Page 152

13 
Empowerment 
“Everyone should understand their rights, and be fully supported to take part
in developing policy and practices which affect their lives” 
Much of the discussion above around participation and accountability also applies to
empowerment – prisoners cannot be empowered if they do not have
opportunities to participate or do not have recourse to hold authority to account. We
would expect prisoners to understand their rights and be fully supported in utilising
them. 
Inspectors were pleased to note that prisoners could easily request maintenance
issues to be logged, mattresses replaced or their cell to be painted. This level of
empowerment over their own environment was pleasing to observe. 
Information provision was adequate, with copies of the prison rules, SOPs, and
legislation available on request. This could be improved by having the material in
easy reach of prisoners without having to request it. It is also important from an
empowerment perspective for prisoners to know what sort of legal texts are available
to them, while it is reassuring that the prison make the material available to
prisoners, this should be signposted better. 
HMIPS found discipline hearings and case conferences supported prisoners well,
allowing them to understand the actions taken against them. There was time taken to
explain decisions and the actions prisoners could take if dissatisfied with any
outcomes. Inspectors found that generally prisoners understood why they were being
managed in a certain way, and what was expected of them to turn their situations
around, particular when being managed under rule 95. 
HMP Shotts piloted a Kiosk system which allowed prisoners to use a computer
system in their hall to access important material, make meal choices and other
functionality. Once this system is fully exploited, this will be a good example of
empowerment. The establishment must be careful to ensure individuals of all
technical and literacy ability are supported to use the system, but in general HMIPS
are very supportive of its incorporation and extension. 
HMIPS would like to see prisoners at the centre of policy and decision making, with
more engagement and involvement at all levels. 
LEGALITY 
“Approaches should be grounded in the legal rights that are set out in
domestic and international laws” 
A human rights-based approach requires the recognition of rights as legally
enforceable entitlements and is linked to national and international human rights law.
The UK must respect the UN Standard Minimum Rules for the Treatment of
Prisoners (Nelson Mandela Rules); the European Prison Rules; The Convention
against Torture, including the Optional Protocol and others. It is important that all
categories of prisoners enjoy the full range of human rights and that staff are

Page 153

14 
adequately supported. Inspectors have identified areas where they believe further
action is required, in particular to ensure that more marginalised prisoners do not fall
through the gap. 
The realisation of human rights is facilitated in practice by both the provision of
information and the need for proactive action to be taken to ensure prisoners are
accessing their rights in practice. A human rights-based framework is concerned with
anticipating areas of prison life where problems are likely to arise, responding to
prisoners needs as they are raised and building in monitoring mechanisms to ensure
systems are improved through experience. This is the sort of human rights
infrastructure which could be further developed at HMP Shotts. Inspectors did not
find practice which directly called into question the legality of the establishment, but
we do encourage HMP Shotts to work harder to actively apply a human rights based
approach in their activities.

Page 154

15 
STANDARDS, COMMENTARY AND QUALITY INDICATORS
STANDARD 1 - LAWFUL AND TRANSPARENT CUSTODY
The prison complies with administrative and procedural requirements of the law,
ensuring that all prisoners are legally detained and provides each prisoner with
information required to adapt to prison life. 
The prison ensures that all prisoners are lawfully detained.  Each prisoner’s
time in custody is accurately calculated; they are properly classified, allocated
and accommodated appropriately. Information is provided to all prisoners
regarding various aspects of the prison regime, their rights and their
entitlements. The release process is carried out appropriately and positively
to assist prisoners in their transition back into the community. 
Inspection Findings 
Overall Rating:  Satisfactory performance 
In this standard, one quality indicator was not applicable, seven were rated as
satisfactory performance and one was generally acceptable giving an overall rating
of satisfactory performance. There was one example of good practice and two
recommendations for improvement. 
HMP Shotts was a long-term establishment that did not receive prisoners directly
from court, only transfers from other establishments.  Therefore, new arrival numbers
were low and every prisoner had spent time in another establishment prior to
arriving.  For this reason, prisoners already knew their release dates and had a good
understanding of how prisons in Scotland run.  The prison also had the benefit of
knowing who was arriving and when, which allowed them to classify prisoners in
advance and agree their location within the prison.  If a prisoner attended court whilst
in custody and the outcome affected their release dates, there were efficient
processes in place to inform prisoners and interested parties of their new dates. 
Due to the low number of prisoners arriving, inspectors were only able to observe
one new admission during the inspection.  However, staff were able to clearly
explain the processes, which were supported by Standard Operating Procedures
(SOPs). A Reception Risk Assessment (RRA) and First Night Admissions Checklist
were completed for every prisoner, and inspectors were content that all prisoners
were assessed regarding their ability to understand and had the opportunity to
engage with the admissions process. 
Prisoners were provided with sufficient information about HMP Shotts via the First
Night in Custody Checklist and the National Induction Presentation (NIP), which was
offered to all prisoners.  The induction officer proactively met with every prisoner to
encourage them to attend and establish their background, and then tailored it to their
needs.  It was delivered on a one to one basis or occasionally in small groups and
was well received by prisoners.  A helpful Family Information Awareness Package
and face to face induction session was available to friends and family of prisoners in

Page 155

16 
HMP Shotts.  SPS HQ need to review the NIP and booklet to ensure that it provides
up to date information to prisoners. 
There were good processes in place for liberating prisoners and the release process
ran smoothly. 
The staff undertaking the admissions, induction and liberations process were
friendly, polite and professional, and knowledgeable about their role.  Prisoners
spoken to were content that they had received the information they required. 
In terms of the PANEL principles for this Standard: 
Participation.  Prisoners were invited to engage in the admissions process via
the RRA form and the First Night Admission Checklist. Both of which were
completed in a confidential setting. 
Accountability. There were efficient processes in place for admission to and
liberation from HMP Shotts. During the reception process and on arrival at the
hall, prisoners were provided with information about their entitlements.  The
Links Centre Officer met with every prisoner in advance of their induction and
tailored the presentation to suit their needs. The officer also met with them in
advance of their liberation to offer support and guidance appropriate to their
needs e.g. benefits advice, applications for ID. 
Non-discrimination and equality.  Prisoners were classified and allocated to
an area in the prison in advance of them arriving, so they were quickly placed in
the area that best suited their needs.  Prisoners that required additional
assistance with the admissions process were identified on arrival at reception.
Translation services were available and guidance for staff on how to use them.
Prisoners were offered guidance and support in advance of their liberation date. 
Empowerment. Prisoners were provided with an Admission Information Pack
in reception and were taken through a First Night Admissions Checklist on
arrival at their residential hall.  There was sufficient information provided in
these to enable the prisoner to know their rights in advance of attending a full
induction session, which provided further valuable information. The checklist
and the RRA enabled staff to identify prisoners with additional needs.  All
documentation was available in nine other languages, braille and British Sign
language (BSL). 
Legality.  Staff followed the lawful procedures and completed them in a
professional manner. 
Encouraging observations 
 The Family Information Awareness Package for families and friends of
prisoners

Page 156

17 
Emerging concerns 
 SPS HQ should take action to update the NIP and booklet to ensure it provides
up-to-date information to prisoners.
 The Link Centre Officer responsible for delivering induction was a singleton post
and there was no cover during absence.

Page 157

18 
Quality Indicators 
1.1 Upon arrival all prisoners are assessed regarding their ability to
understand and engage with the admission process. 
Rating:  Satisfactory performance 
HMP Shotts did not receive prisoners directly from court, therefore the opportunity to
observe the admissions process was greatly reduced.  However, staff were able to
walk inspectors through the process and although only observing one admission,
standards were fully met.  The reception area was quiet and calm due to the low
number of admissions, which contributed to a relaxed experience for those arriving. 
If more than one prisoner arrived at reception, they were brought off the escort van
one at a time and processed at the staff desk, which allowed for confidential
discussions to take place.  Assessing their ability to understand and offering an
opportunity to engage in the admissions process was done via the RRA form.
Reception staff asked many of the RRA questions whilst searching the prisoner in a
private setting, which reduced the admission time and made the process more
relaxed.  Reception officers were friendly, polite and professional when interacting
with prisoners.  An RRA was also completed for those returning from court or
hospital and all prisoners coming through reception saw a nurse in a private room. 
Foreign national prisoners were directed to the language identification charts to
ascertain which language they spoke. There was a folder held with instructions on
how to use translation services, but inspectors were advised that it was rarely
required. 
There were two SOPs covering the admissions process, one of which was
specifically for prisoners’ subject to or suspected to be infected with COVID-19.
Inspectors observed that staff followed the instructions laid out. 
Inspectors were informed that admissions could be processed quite quickly
dependent upon how much property came with them. 
Inspectors spoke to prisoners who had recently been admitted and they were all
positive about the experience and the staff working in reception. 
Reception staff had received relevant training to carry out their role. 
1.2 On admission, all prisoners are provided with information about the
prison regime, routine, rules and entitlements in a form that enables the
prisoner to understand. 
Rating:  Satisfactory performance 
Prisoners arriving at HMP Shotts had already spent time in another establishment.
Therefore, they had an understanding of how prisons run, and the core screen
paperwork had already been completed and information recorded on PR2.

Page 158

19 
New admissions were provided with an Admission Information Pack in reception,
written by the person responsible for delivering induction. The pack provided
prisoners with enough of an understanding about how HMP Shotts ran and their
entitlements until they could be offered a fuller induction.  The pack was available in
nine different languages, BSL and braille, and staff were aware of how to use
interpretation services if required. 
With the exception of the race relation statement, there was no information displayed
on the walls of the reception or holding areas.  Inspectors were informed that the
TVs with an information channel and posters had been removed as they were being
destroyed.  HMP Shotts should consider reintroducing them to reinforce the
information provided in the pack and also help prisoners pass their time in reception. 
There were no peer supporters working in the reception area and HMP Shotts
should consider adding peer supporters in this area. 
On arrival at their hall of allocation, prisoners were taken through a First Night
Admissions Checklist by residential staff, usually in the evening once prisoners had
been locked up to allow officers sufficient time with people.  Again prisoners had
gone through a first night in custody process at their receiving prison, but it was
helpful to provide further information relevant to HMP Shotts. They were also
provided with a Health and Safety Policy and an SPS booklet.  The Checklist
identified communication barriers, which allowed officers to tailor their delivery to suit
the person’s needs.  It was signed by the prisoner and the residential officer, assured
by an FLM and sent to the induction officer within 48 hours, to help form the basis of
the prisoner’s induction into Shotts.  There was a First Night in Custody Protocol
available to staff to ensure consistency in the process. 
Prisoners spoken to were content that they were provided with enough of an
understanding of how the prison ran during the admissions process. 
1.3 Statutory procedures for identification and registration of prisoners are
fully complied with. 
Rating:  Satisfactory performance 
The admissions process SOPs covered the identification and registration of
prisoners, and reception staff were observed to complete the process as instructed.
This included checking the Prisoner Escort Record (PER) and querying any
issues/concerns with escorting staff, completing the seven-point warrant check and
confirming the prisoner’s identity using the warrant for reference. 
The PER should identify any special needs, including risk factors and the RRA
provided a further opportunity for this. 
As reported in QI 1.1, an RRA was completed for those returning from court, which
took account of any changes of circumstances and needs that may arise as a result
of this.

Page 159

20 
PR2 was updated as appropriate and the warrant was then passed to the Criminal
Desk.  See QI 1.7 for more about this process. 
1.4 All prisoners are classified and this is recorded on the prisoner’s
electronic record. 
Rating:  Satisfactory performance 
As reported previously, HMP Shotts did not receive prisoners straight from court.
They were transferred in from another establishment, which meant that the prison
knew in advance who was arriving and on what date.  The Population Manager at
HMP Shotts managed this process, with input from the Prison Management Meeting. 
The Population Manager had built up good relationships with other establishments
and liaised with them about transfers in and out of HMP Shotts. He had various
spreadsheets in place to manage the process efficiently.  He arranged for the
necessary background checks to take place and allocated prisoners to a suitable
location in the prison before they arrived. 
A weekly email was sent to interested parties on a Friday for the week ahead,
detailing all transfers in and out of the establishment.  PR2 was updated as
appropriate. 
The exception to this was prisoners eligible for placement into the National Induction
Centre (NIC), where the NIC manager managed transfers in and out and arranged
for background checks to be completed before accepting them. 
1.5 All prisoners are allocated to a prison or to a location within a prison
dependent on their classification, gender, vulnerability, security risk or
personal medical condition. 
Rating:  Satisfactory performance 
As reported in QI 1.4, HMP Shotts were aware of prisoners due to arrive in their
establishment in advance.  Other establishments contacted the Population Manager
at HMP Shotts with requests to transfer prisoners to them, and HMP Barlinnie issued
a weekly list of long-term prisoners (LTPs) waiting to transfer to a long-term
establishment. 
The Population Manager used a database and spreadsheet to manage this process.
He arranged for the necessary checks to be completed, allocated them a location in
the prison before they arrived, and informed reception staff where the prisoner
should be located. 
If a prisoner with accessibility needs was on the list to transfer in, they would not be
taken unless there was an accessible room available for them. The Population
Manager could not recall this ever having been an issue.

Page 160

21 
The NIC manager managed this process for those being placed in the NIC.  Eligible
prisoners were interviewed and must agree to participate in the NIC regime before
being accepted. 
Prisoners who request protection were assessed prior to going on protection and
were reviewed annually. 
1.6 A cell sharing risk assessment is carried out prior to a prisoner’s
allocation to cellular accommodation. 
Rating:  N/A 
All prisoners held in HMP Shotts at the time of the inspection were placed in single
cell accommodation, therefore there was no requirement for cell sharing risk
assessments. 
1.7 Release and conditional release eligibility dates are calculated correctly
and communicated to the prisoner without delay. 
Rating:  Satisfactory performance 
The staff on the Criminal Desk within HMP Shotts were responsible for the
calculation of release dates, therefore all warrants were passed to them by
reception. Because HMP Shotts did not receive prisoners directly from court, they
did not provide those arriving with release dates as they would already know them.
However, the Criminal Desk rechecked the calculation to be confident that the dates
were correct for those in their care. 
If a prisoner attended court whilst in custody and the outcome affected their release
date, reception notified the Criminal Desk and passed the warrant to them.  The
Criminal Desk recalculated their release dates and updated PR2 within 24 hours.
There was an assurance process in place whereby the manager checked and signed
off the calculation and confirmed the date on PR2.  A critical dates template was then
sent to the prisoner to inform them of their new dates and an email was issued to
relevant staff attaching the warrant and sentence calculation.  If their dates were not
affected following a court appearance, the criminal desk emailed staff to inform them
of any additional charges and confirmed no change to their release dates. 
Staff confirmed that there were good relationships in place with the Crown Office and
Procurator Fiscal Service (COPFS) should they need to query anything on the
warrant. 
To date there had been no detainee or liberations in error at HMP Shotts. 
There were two members of staff working on the Criminal Desk.  Both were
competent in warrant identification and calculation and they covered for each other
during leave periods. 
The processes in place were efficient and there was a suitable assurance process in
place. All paperwork was stored and destroyed appropriately.

Page 161

22 
1.8 All prisoners attend an induction session as soon as practicable, but no
later than one week after arrival, which provides a thorough explanation of
how the prison operates and what the prisoners can expect, including their
rights and obligations. 
Rating: Generally Acceptable performance 
HMP Shotts received a low number of new admissions, and during the pandemic this
was further reduced. Prisoners arriving had already completed national induction at
their previous establishment. 
The Links Centre Officer was responsible for delivering induction to new admissions
and was clearly enthusiastic about her role.  She was notified of new admissions via
the First Night Admissions Checklist sent to her from residential hall.  She proactively
arranged to meet with every new admission to encourage them to attend induction,
and to find out their background and identify any communication needs so that she
could tailor the presentation to suit.  It was delivered on a one to one basis or
occasionally in small groups.  Translation services were used for foreign nationals as
required and had recently been used to communicate with a Vietnamese prisoner.
The National Induction Programme (NIP) was used as the basis for the induction and
text was added to provide information pertinent to HMP Shotts. Inspectors noted
that the NIP did not cover (PIAC), which is an important vehicle for prisoners to have
their say and influence decisions that affect their life.  HMP Shotts updated their
presentation during the inspection.  HMIPS ask that Scottish Prison Service
Headquarters (SPS HQ) update the presentation to include this. 
Inspectors observed delivery of the NIP to a new admission who had not been to
prison before.  It was very clearly delivered, in a supportive but professional style,
and tailored to suit the individual.  It provided a thorough explanation of how the
prison operated. Prisoners spoken to were positive about the information provided
to them during induction. 
Those that did not wish to attend induction were provided with an NIP booklet, which
was available in nine other languages, braille and BSL, and non-attendance was
recorded on Prison Records System (PR2). No follow-up action was taken, but
inspectors were not overly concerned as they would have received induction before
arriving at HMP Shotts.  Inspectors noted that the induction booklet was out of date,
e.g. it talked about smoking in cells which was no longer permitted and referred to
Visiting Committees. SPS HQ should take action to update the booklet and reissue
it to prisons. 
Induction was delivered as quickly as possible but not always within seven days.
This was because the Links Centre Officer was a singleton post and the officer had
other duties to attend to.  There was also no cover when the officer was absent.
Inspectors were not overly concerned about this because new admissions would
have received the NIP before arriving at HMP Shotts.  They were also given the
Admissions Information Pack in reception and taken through the First Night
Admissions Checklist on arrival at their residential hall.  However, HMP Shotts
should aim to deliver an induction to all new admissions within the agreed seven
days.

Page 162

23 
HMIPS were pleased to hear that HMP Shotts issue a Family Information Awareness
Package to families and friends of prisoners, along with the offer of a face-to-face
Family Induction that had been delivered in both the prison and in the community.
This is considered good practice. 
Recommendation 1: SPS HQ should take action to update the NIP and
booklet to ensure it provides up to date information to prisoners. 
Recommendation 2: HMP Shotts should arrange cover for the Links Centre
Officer when they are absent. 
Good practice 1: HMP Shotts issue a Family Information Awareness Package
to families and friends of prisoners. 
1.9 The procedures for the release of prisoners are implemented effectively
with provision for assistance and basic practical arrangements in place. 
Rating:  Satisfactory performance 
Standard 7 will report on how the release process proactively facilitates the prisoners
transition back into the community. 
For those being liberated, the Parole Board for Scotland sent the license conditions
to the Criminal Desk. All paperwork was then sent to the relevant Unit Manager to
sign off and they met with the prisoner one or two days in advance of their release to
talk them through their license conditions and provide them with a copy.  The
Criminal Desk sent out a liberation list mid-way through the month for the following
month, so that all relevant staff had a few weeks’ notice of prisoners due for release.
Prior to release, the Links Centre Officer offered support to prisoners with benefit
entitlements including community care grants, assisted them to make an application
for a basic bank account and a citizen card photographic ID.  She also offered advice
about transport to their destination and location of GP surgeries. 
On their date of release, prisoners attended the prisoner reception area where they
were reminded of their license conditions.  All personal property and money stored
on their behalf was returned to them and signed for, with the exception of their
mobile phone that was returned to them at the front of house before leaving the
establishment. They were offered holdalls to place their property in which provided
them with privacy on release.  Every effort was made to coincide their release time
with transport links and appointments made in the community, and inspectors
witnessed this happening.  For those that required it, Naloxone was placed in their
property by healthcare staff in advance of their release date.  If required, prisoners
being liberated were offered a travel warrant to provide them with a means to reach
their destination. Stocks of appropriate clothing were held in reception should
prisoners require it.  Prisoners were also invited to participate in an exit interview to
allow the prison to review their experience of HMP Shotts.  They were then escorted
to the front of house reception area where their details were checked again and they
were permitted to leave the establishment.

Page 163

24 
Inspectors were able to observe two liberations during the inspection, and followed
them on their journey, from being brought to the prison reception area from their
residential hall to being released through the front of house reception.  The process
ran smoothly and staff dealt with the prisoners really well, providing reassurance for
those who were nervous about being released. 
The Criminal Desk sent a notification to interested parties, such as Police Scotland
to inform them that a prisoner had been liberated and attached their licence
conditions. 
An SOP was available to staff to cover the release process.

Page 164

25 
STANDARD 2 - DECENCY 
The prison supplies the basic requirements of decent life to the prisoners. 
The prison provides to all prisoners the basic physical requirements for a
decent life.  All buildings, rooms, outdoor spaces and activity areas are of
adequate size, well maintained, appropriately furnished, clean and hygienic.
Each prisoner has a bed, bedding and suitable clothing, has good access to
toilets and washing facilities, is provided with necessary toiletries and
cleaning materials and is properly fed.  These needs are met in ways that
promote each prisoner’s sense of personal and cultural identity and
self-respect.
Inspection Findings
Overall Rating:  Generally acceptable performance 
In this standard, four quality indicators were rated as satisfactory, one was rated as
generally acceptable and one was rated as poor, giving an overall rating of generally
acceptable performance. There was one example of good practice, and
eight recommendations for improvement. 
HMP Shotts was built in 2012 with all cells being single occupancy. The original
operational capacity was 553 but was increased to assist with population issues
during COVID-19. The four accessible cells were of a good size and practical
construction, containing the necessary equipment and mobility aids for the
occupants. 
The prison buildings were found to be in good condition, fit-for-purpose, and to have
good levels of cleanliness. All areas had cleaning schedules and each residential
area had at least one prisoner trained in dealing with biohazard incidents.
Although biohazard kits were available, the contents varied in every hall and the
majority of staff were not aware that an up-to-date ‘grab box’ was available for use. 
The standard of prisoners bedding, mattresses etc. was of an appropriate quality in
most cases with the majority of prisoners having their own personal bedding. The
prison laundry worked well with efficient processes in place, however It was noted a
need for an improved method around the securing of laundry bags to prevent loss or
damage. 
Prisoners were given free access to essential toiletries on the halls, with adequate
items in stock. In addition, the prison canteen offered a good range of toiletries to
suit all budgets. 
Although Inspectors were informed that there had not been a PIAC in respect of the
canteen since February 2020 due to COVID-19 restrictions, they were plans in place
to restart them at the end of June 2022, giving prisoners the opportunity to influence
the items available for them to purchase.

Page 165

26 
Prison issued clothing was held in a store room located on each residential area and
found to be well stocked. HMIPS found that prisoners knew the process in respect of
requesting clothing and would receive it with little or no delay. 
Prisoners ordered their meals through the new Kiosk system, which clearly displayed
nutritional information and allergens contained in all choices. However, updates to
the Kiosk were required to make the process run more smoothly. 
A process was in place to cater for those that required a special diet and inspectors
were pleased to see a varied bespoke menu in place for one prisoner with health
issues. Overall cleanliness of the pantries was good, but there was room for
improvement with regards to dealing with waste food products from the previous
day’s meals. Although issues around the corrosion of microwave ovens were
highlighted in an internal audit in February this year, this had yet to be addressed. 
A significant number of prisoners (75%) expressed dissatisfaction with the overall
quality of food in HMP Shotts, with most stating that it was ‘soggy’ or ‘stodgy’. Having
observed the food trolleys, which were loaded and sent to the halls as close to meal
time as possible, there still seems to be an issue with the quality which could be
related to the type of trolley being used. We encourage HMP Shotts to review their
trolleys and look at those in HMP Low Moss, where the food trolleys were found to
have less detriment on the condition of food arriving at the halls. 
Food was not always temperature checked at the point of service and very few
prisoners serving food wore the appropriate PPE. Only one area was observed
securing the pantry door to prevent unwarranted access during meal service.  In
multiple locations some items were placed on a dining table where self-service
appeared to be the norm. This was concerning for potential cross contamination as
well as portion control. 
Training records were reviewed and showed that only 77% of prisoners working in
the Catering Department had completed the required Food Hygiene certification, with
only 50% of prisoners trained. 
In terms of the PANEL principles for this standard: 
Participation:  PIACs in respect of the canteen had not been held since
February 2020, it was encouraging to see that they were scheduled to start
again in June 2022 but this was not met at the time of the inspection. 
Staff and prisoners were aware of how to raise maintenance issues and they
were generally dealt with promptly, replacement clothing, bedding, towels and
toiletries were readily available on request and in good supply. 
Accountability:  There were a number of checks and assurances within this
standard including mattresses being replaced on request and each hall being
allocated three new mattresses a month with a rotational change every
three years to ensure they were fit-for-purpose. A process was in place for
access to the laundry by all prisoners three times a week and for the supply
and replacement of clothing.

Page 166

27 
There was a good maintenance and prevention programme in place through
the “Agility” platform to ensure issues were prioritised and dealt with efficiently. 
Non-discrimination and equality:  Inspectors did not witness any direct
discrimination during the inspection. 
Empowerment: Prisoners had access to the basic requirements for a decent
life and understood the process for raising maintenance issues, obtaining
clothing and essential hygiene items.  Prisoners were permitted to wear their
own personal clothing whilst in the halls. 
Legality: Inspectors did not find anything during the inspection of this standard
that compromised any domestic or international laws. 
Encouraging observations 
 The size and layout of the accessible cells.
 The planned return of PIACs for the prisoner canteen process.
 Cleanliness and general condition of the prison.
 Maintenance programme had a low number of outstanding jobs and the majority
were dealt with within the allocated timescales. 
Emerging concerns 
 The high proportion of prisoners who complained about the food quality
 The solution for securing prisoners laundry bags was to tie a sock around the
neck of the bag so it can be identified by the prisoner alone, this process was
explained as part of the induction process and is far from professional.
Numbered ties should be considered as a secure way of identifying property in
the laundry.
 Biohazard ‘grab kits’ require to be monitored and maintained on each hall.
 All prisoners involved in food production or service should be appropriately
trained to carry out these duties.
 All prisoners serving food should be wearing the appropriate PPE.
 All areas should be checking food temperatures and recording it appropriately.
 The prison should adhere to point of service processes to ensure that all food is
served in conditions that comply with all Food Hygiene requirements.
 All equipment with signs of corrosion should be replaced.
 There is a need to review the delivery equipment from the Catering Department
to Halls to deliver a better quality product at point of service.

Page 167

28 
Quality Indicators 
2.1 The prison buildings, accommodation and facilities are fit-for-purpose
and maintained to an appropriate standard. 
Rating:  Satisfactory performance 
The general feel around the prison was of a clean and well maintained establishment
with buildings that were fit-for-purpose. There was no evidence of structural issues,
graffiti or walls requiring painting or repair; the paintwork throughout the prison was
fresh and well maintained. A good process was in place on each level within both
halls for painting, with equipment held within each hall and paint sourced through the
maintenance team. Prisoners could easily request their cell to be painted and this
was facilitated by the nominated prisoner painting party within that hall.  This process
worked well. 
Inspectors looked at the four accessible cells within the prison and sought the views
of three of the occupants. The cells were a good size with large glass fronted wet
rooms containing all of the necessary equipment and access handles for those with
mobility issues to comfortably use.  Occupants confirmed the cell facilities met their
requirements and that staff were attentive to their needs. All of the accessible cells
were found to be clean and fresh.  A safer cell was located on the ground floor of
Allanton and Lamont halls.  Both were not in use at the time of the inspection, but
were very clean and contained the basic necessary equipment with the beds
consisting of a mattress located on a concrete plinth.  It was noted that the safer cell
in Allanton had just been painted. 
All cells were fitted with adequate sanitation facilities and the intercom call points
were found to be in good working order.  The maintenance process worked well
within the prison, prisoners were aware that they reported a fault to staff who then
created a job request to the maintenance team via the “Agility” system.  The job was
given a priority rating and progressed, prisoners reported to inspectors that they
received a good service and repairs were carried out in good time. Prisoners and
staff were clear on how to report maintenance issues and were very complimentary
about the effectiveness of the estates team. 
The maintenance programme was viewed and at the time of inspection had a 91.6%
completion rate with only 6.72% jobs outstanding, this equated to five jobs and the
inspectors found that all were delayed for good reason such as awaiting parts or
specialist involvement. 
The prison maintenance team had three larger projects running at the time of the
inspection, the fitting of LED lighting throughout the prison, the fitting of a macerator
machine in the waste system and an upgrade to the hot water system.

Page 168

29 
2.2 Good levels of cleanliness and hygiene are observed throughout the
prison and procedures for the prevention and control of infection are followed.
Cleaning materials and adequate time are available to all prisoners to maintain
their personal living area to a clean and hygienic standard. 
Rating:  Satisfactory performance 
The prison was found to have very good levels of cleanliness throughout and
cleaning schedules for the prison in general and residential halls were in place. The
industrial cleaning team were responsible for cleaning most areas of the prison. This
team was considerably smaller than it was pre-COVID-19, but the quality of the staff
was high.  Hall pass men were responsible for cleaning the residential areas.
Prisoners were encouraged to keep their cells tidy and those that were unable, were
assisted by hall pass men. 
Relevant training records were kept by the prison including prisoner’s biohazard and
British Institute of Cleaning Sciences (BICS) qualifications, and there were sufficient
cleaning materials held on the halls. 
The industrial cleaning staff were responsible for the training of hall pass men, the
green pass cleaners for specific areas in the prison and those from the work party.
Prisoners spoken to confirmed that they had received relevant training and were
confident in their work. 
Each hall had at least one pass man trained in dealing with biohazard incidents.
Inspectors requested to view the cleaning process and found that the contents of the
biohazard kits varied in every hall. When requested, the majority of staff produced
an outdated kit and were not aware that an up-to-date grab box was available for
use. However, when these grab boxes were inspected some were found to be
missing essential content. 
Recommendation 3: Biohazard kits throughout the prison should be refreshed
and communication improved to make staff and prisoners aware of availability
and access for use. 
2.3 All prisoners have a bed, mattress and pillow which are in good
condition, as well as sufficient bedding issued by the prison or supplied by the
prisoner. The bedding is also in good condition, clean and laundered
frequently. 
Rating: Generally acceptable performance 
A number of prisoners beds, mattresses and bedding were inspected and found to
be in good condition. Some prisoners reported that the mattresses were too thin but
they had the ability to request a replacement mattress at any time. Their name
would be placed on a list and each hall was allocated three mattresses a month to
distribute. If a prisoner required a mattress in an emergency one would be provided.
Inspectors were informed that a three-year mattress replacement programme was
underway.

Page 169

30 
The prison laundry worked well with efficient processes in place. The laundry work
party consisted of 24 prisoners pre-COVID-19 but was operating adequately at the
time of inspection with a team of six.  Laundry staff reported that the washing
machines were over 10 years old and starting to show their age but a replacement
programme was anticipated to be starting soon. 
Induction training was provided by staff working in the laundry and a workshop
training record was kept. 
Work wear, personal clothing and bedding can all be washed at the laundry.
Prisoners put items in a net bag and place them in a large container on each hall for
collection three times a week.  It was noted by inspectors that the net bags were
sealed by tying a sock around the neck, and prisoners reported that they recovered
their laundry by identifying their bag by the sock.  There was no fixed process in
place for recovering lost laundry items, prisoners were advised in the information
packs provided during the admission process that items placed in the laundry system
were done so at their own risk. 
A small number of prisoners complained to inspectors that laundry bags often went
missing. Laundry staff were not aware of this being an issue and a check of prison
systems showed that there had been no complaints made regarding laundry over the
preceding six months. 
Recommendation 4: Numbered ties for securing laundry bags should be
provided so prisoners property can be identified. 
2.4 A range of toiletries and personal hygiene materials are available to all
prisoners to allow them to maintain their sense of personal identity and
self-respect.  All prisoners also have access to washing and toileting facilities
that are either freely available to them or readily available on request. 
Rating:  Satisfactory performance 
Prisoners were given free access to essential toiletries on the halls and inspectors
found adequate items in stock on all residential areas.  In addition, the prison
canteen offered a good range of toiletries to suit all budgets. 
Inspectors were informed that there had not been a PIAC in respect of the canteen
since February 2020 due to COVID-19 restrictions. Inspectors were pleased to hear
that a PIAC was scheduled for the end of June 2022 and prisoners would be given
the opportunity to influence the items available to them. 
All cells within HMP Shotts had showers and toilets therefore prisoners were free to
use them whenever they pleased. The washing facilities in the accessible rooms
were excellent with plenty of space and access points. The proposed upgrade of the
hot water system will ensure the continued provision of sufficient washing facilities in
the future. 
There was a sufficient stock of towels that were in good condition and laundered
regularly.

Page 170

31 
2.5 All prisoners have supplied to them or are able to obtain for themselves
a range of clothing suitable for the activities they undertake.  The clothes
available to them are in good condition and allow them to maintain a sense of
personal identity and self-respect.  Clothing can be regularly laundered. 
Rating:  Satisfactory performance 
All prison issued clothing was held in the store room located on each hall.
Inspectors found sufficient stocks of clothing in all sizes in all halls, and there was a
combination of new and recycled clothing available with additional stock held in the
laundry.  Prisoners reported that they knew the process in respect of requesting
clothing and receive it with little or no delay. 
It was noted that jeans were limited in number on some halls and staff explained that
this was due to the supply being suspended due to COVID-19 restrictions. It was
found that demand for jeans had, however, dropped therefore any shortage was not
proving to be an issue. It may be that the current rule of prisoners not being required
to wear jeans during visits is a contributory factor and this may change should this
rule be revoked in the future. 
Outdoor jackets were of high visibility and good quality, with prisoners reporting they
were fit-for-purpose. There were adequate jackets in stock and available if required. 
Prisoners were permitted to wear their own clothing in residential areas to allow them
to maintain a sense of personal identity. 
See QI 2.3 in respect of information about the laundry. 
2.6 The meals served to prisoners are nutritionally sufficient, well balanced,
varied, served at the appropriate temperature and well presented.  Meals also
conform to their dietary needs, cultural or religious norms. 
Rating: Poor 
The meals provided were on a three-week set menu cycle.  Meals were ordered
through the new Kiosk system, which clearly displayed nutritional information and
allergens contained in all choices.  However, any special dietary needs were ordered
separately and tracked by the catering staff, due to the Kiosk system requiring
further updates.  Additionally, prisoners reported some issues in regards to
re-ordering when the same choice(s) was wanted in future weeks.  It was also
reported by catering staff that amendments to the menu were not possible until the
system was fully updated. 
Catering staff identified several groups of prisoner who were following cultural or
religious dietary requirements.  However, one prisoner with significant health
concerns required more substantial adjustment, and as such, a bespoke menu which
retained variety and met their nutritional needs had been created for them.  This was
seen as good practice, being able to resource and accommodate a tailored service
for those who needed, whilst achieving a high volume output service function that
was key to the establishment.

Page 171

32 
Overall cleanliness of the pantries was generally good.  However, both sections of
Lamont Level 1 and 2 could be improved.  These areas consistently showed signs of
waste food products from the previous day’s meals. Additionally, whilst checking
equipment a significant number of microwave ovens were found to be corroded, with
the potential for flaking debris to contaminate food during cooking. Disappointingly, it
appeared that this was identified during internal auditing in February this year, but
had not yet been addressed. The internal audit appeared to have been very robust
and identified a number of issues which remained as actions still requiring to be
addressed. 
A significant number of prisoners expressed dissatisfaction with the overall quality of
food in HMP Shotts, with most stating that it was ‘soggy’ or ‘stodgy’.  The food
trolleys were witnessed being loaded and sent to the halls as close to meal time as
possible, and there was equipment within the pantry areas (air fryers) to re-fresh
some products but, on such a scale this would seem impractical.  The food trolleys
appeared to be common to other establishments with the exception of HMP Low
Moss, where the food trolleys more effectively maintain the condition of food arriving
at the halls. 
Point of service for meals appeared a little less consistent across the establishment.
Although some areas appeared to be carrying out temperature checks at the point of
service this was not witnessed in all areas.  Additionally, very few prisoners serving
food were observed wearing the appropriate PPE.  Only one area was observed
securing the pantry door to prevent unwarranted access during meal service.
Indeed, on a number of occasions and locations, the pantries were found to have
numerous prisoners preparing their own food whilst service was on-going; and on
more than one occasion servers were observed eating whilst serving.  In multiple
locations some items, such as soup, custard and salad were placed on a dining table
where self-service appeared to be the norm. This was concerning for potential cross
contamination as well as portion control (a prisoner was observed moving between
sections because custard had run out in their section). 
Training records were reviewed and showed that only 77% of prisoners working in
the Catering Department had completed the required Food Hygiene certification.  Of
those prisoners listed for pantry duties, this was found to be slightly less than 50%
trained in Food Hygiene, which may be reflective of their awareness to wearing PPE
and not eat whilst serving food.  Indeed, catering supplies were checked and there
appeared to be an abundance of PPE available.  Catering staff absence had
affected, and remained an issue for the Catering Department and requisite training. 
Good Practice 2:  Catering staff provide consultation and provision for those
with additional dietary necessities. 
Recommendation 5: HMP Shotts should ensure Kiosk updates are completed
timeously to prevent frustrations with the ordering of special diets. 
Recommendation 6: HMP Shotts should ensure all prisoners involved in food
production or service are appropriately trained to carry out these duties.

Page 172

33 
Recommendation 7: HMP Shotts should ensure that all food is served by the
appropriate person who must always be wearing appropriate PPE in conditions
that comply with all Food Hygiene requirements. HMP Shotts should also
ensure consistent checking and recording of food temperatures. 
Recommendation 8: HMP Shotts should replace all equipment which has
signs of corrosion, or equipment which is known to be faulty. 
Recommendation 9: HMP Shotts should implement the required actions from
previous catering audit in February 22, and re-audit to measure compliance. 
Recommendation 10: HMP Shotts should review their delivery equipment
from the Catering Department to Halls to ascertain if improved heat holding can
be achieved, and subsequently deliver a better quality product at point of
service.

Page 173

34 
STANDARD 3 - PERSONAL SAFETY 
The prison takes all reasonable steps to ensure the safety of all prisoners. 
All appropriate steps are taken to minimise the levels of harm to which
prisoners are exposed.  Appropriate steps are taken to protect prisoners from
harm from others or themselves. Where violence or accidents do occur, the
circumstances are thoroughly investigated, and appropriate management
action taken. 
Inspection Findings 
Overall Rating:  Generally acceptable Performance 
In this standard, one quality indicator was rated as good, two were rated as
satisfactory, and four were rated as generally acceptable performance giving an
overall rating of generally acceptable performance. There were four examples of
good practice and 10 recommendations for improvement. 
The prison had largely emerged from the limitations and consequences of
COVID-19, and it felt safe and ordered. 
Prisoners managed under Talk To Me (TTM) were managed with care, compassion
and understanding.  TTM case files checked had some gaps in relation to completion
and HMP Shotts should continue to take action to improve this. 
In relation to taking care of prisoners whose appearance, behaviour or background
left them at heightened risk of harm, the positive impact the introduction of
photocopying of prisoners’ mail had in mitigating the risk of illicit substances being
introduced to the prison was acceptable. The experiences of staff in 2021 in
managing those under MORS appeared to be such that the staff placed even greater
value on the 40% reduction pro rata in cases so far in 2022. 
A multi-disciplinary approach was being applied to support those at heightened risk
of harm due to mental health and/or substance misuse.  Residential staff were able
to identify and signpost to appropriate stakeholders and there were opportunities for
prisoners to self-refer to available health improvement activities. 
A prisoner information channel (PIC) was a major feature of Fife College’s
contribution to health improvement activities, in collaboration with various internal
and external partners. 
Custody Adjustment Support and Transition (CAST) Pathway within the NIC had at
its foundations, residential staff and Physical Education Instructor (PEI) based
delivery of induction, accredited START programme and other training courses with
input from Fife College, the Health Improvement Practitioner and other stakeholders. 
.

Page 174

35 
Procedures in support of violence reduction strategy were evident across the
establishment. However, it was noted that the SPS Anti-Bullying Strategy ‘Think
Twice’ required to be re-invigorated. 
There was a fully equipped C&R store and a well organised Command Room,
supported by comprehensive contingency plans.  COVID-19 had affected
competencies, with the suspension of training with only 20 of the required 31 C&R
trainers in post. Worryingly, in common with other establishment, there was a lack of
any desktop or live exercise within the past 12 months, with the last Local Incident
Management (LIM) exercise pre-dating COVID-19. 
The Health & Safety Management system in place was found to be compliant,
managed by two qualified part-time Health & Safety Managers responsible for
providing competent advice.  However, fire evacuation drills should re-commence as
soon as reasonably practicable, supported by briefings where necessary to ensure
staff are proficient in procedures. 
In terms of the PANEL principles for this standard: 
Participation. TTM practices were person-centred. Individuals were
encouraged to participate in case conferences and staff/prisoner relationships
appeared good and supportive. There were opportunities for positive
engagement by those otherwise at risk of harm or abuse from others through
self-referral, multi-disciplinary meeting or by embracing the health improvement
activities offered. 
Accountability. Compliance processes for assuring essential procedures in
caring for those at risk of suicide or self-harm including the SPS Suicide
Strategy - TTM, Management of an Offender suspected to be at Risk due to the
ingestion of a Substance (MORS) and Notification of Concern (NOC) were
highly efficient and well managed. The TTM system was well established and
there was a robust assurance process was in place that reported monthly to
SPS headquarters.  Documentation was completed to a high standard and any
slippages were identified and actioned through the assurance process. 
As COVID-19 restrictions reduced, there had been monthly Multi-disciplinary
Team meetings. Meetings were well attended, and minutes demonstrate they
were prisoner focussed.  It was noted that the SPS Anti-bullying Strategy ‘Think
Twice’ required to be re-invigorated. 
Non-discrimination and equality.  Although the establishment demonstrated
a positive approach to equality, the recently planned Equality & Diversity
meeting had not taken place and should be convened at the earliest
opportunity. 
Empowerment. Most of the prisoners reported feeling safe and the prison was
well ordered with staff demonstrating control.  Prisoners provided feedback that
the information on prisoner information channel (PIC) had been useful quoting
the use of breathing exercises. There was evidence of prisoners reporting
being bullied and the perpetrators challenged.

Page 175

36 
Legality.  The application of the Prisons and Young Offenders (Scotland) Rules
appeared legitimate at the time of inspection, with no evidence found of any
non-compliance in terms of procedures observed and checked. The Health &
Safety Management System was mature and provided a good basis for culture. 
Encouraging observations 
 Compliance processes assuring essential procedures in caring for those at risk
of suicide or self-harm including TTM, MORS and NOC were highly efficient and
well managed.
 Health Promoting Friday incorporating ‘Neil’s hugs foundation’, ‘library man
group’ and ‘trauma (NHS information session), etc., in collaboration between Fife
College, SPS and NHS Mental Health Team, Health Improvement Practitioner
and Addictions Caseworker and North Lanarkshire Council.  Open to
mainstream and protection prisoners (full parity).
 Prisoner Information Channel. Podcasts from positive peers, Enhanced
Addictions Caseworker, NHS advertisements, mental health support, meditation,
self-help, music requests, etc.
 Fife College. Use of Library in mental health provision. “Education and
conversation in Art classes”, work with men with speech and language
communication deficits, low literacy learners and dyslexia friendly learning.
 Residential Officer and Physical Education Instructor based delivery of Custody
Adjustment Support and Transition (CAST) Pathway within the National
Integration Centre (NIC) incorporating induction, training courses and case
conferencing with input from Fife College, Health Improvement Practitioner and
other stakeholders.
 Management of Health & Safety across Prisoner Employment and Training
department including risk assessment, safe systems of work and training
arrangements. 
Emerging concerns 
 SPS HQ should reinstate Psychological input into CAST Pathway case
conferencing within the NIC.
 There should be improved administration around completion of TTM case files.
 A regular review of violence reduction should be reintroduced.
 All VIR forms following a Violent Incident Review Panel should be taken to the
Violence Reduction Group meeting for consideration as required by the strategy
document.
 The SPS Anti-bullying Strategy ‘Think Twice’ should be re-launched with
information and training provided as only 40% of staff had been trained since
July 2021
 Posters require to be replenished across the establishment in relation to on the
‘Think Twice’ and violence reduction.
 Staff were not always clear on processes to follow after a staff alarm and should
be reminded of correct protocols
 Conduct a review of incident command role holders to ensure adequate cover for
the establishment, and that role holders are competent.

Page 176

37 
 Contingency exercise arrangements to be reviewed. There had not been any
Contingency exercise arrangements within past 12 months with the last Local
Incident Management (LIM) exercise pre-COVID-19.
 Fire evacuation drills should re-commence as soon as reasonably practicable
supported by briefings where necessary to ensure staff are proficient in
procedures.
 Due to the length of time since the last Noise Assessment taking place, this
should be reviewed in line with policy by a competent person.

Page 177

38 
Quality Indicators 
3.1 The prison implements thorough and compassionate practices to
identify and care for those at risk of suicide or self-harm. 
Rating:  Generally acceptable performance 
Prisoners managed under the SPS TTM Strategy in HMP Shotts were managed with
care, compassion and understanding. 
Information shared between the NHS and the SPS at case conferences was
appropriate and justified in terms of respecting confidentiality, whilst managing the
individual’s risk of suicide and self-harm.  In an observed case conference, it was
noted that the prisoner was only given access to the case file ten minutes before the
conference, resulting in frequent objections to some of the information recorded in
the case file. 
The residential First Line Manager (FLM) who chaired a case conference was not a
regular SRU FLM. Whilst a residential officer was present, it was apparent that the
Chair lacked direct knowledge of the prisoner which could affect the ability to assess
risk and any changes needed to the care plan. 
One individual had been managed on TTM for an extended period of time. An
attempt to remove the individual from TTM and manage him under the SPS self-
harm policy some time ago had been unsuccessful, but it was encouraging to see
arrangements being made for a multi-disciplinary meeting to consider options again. 
Compliance processes were highly efficient and well managed in assuring essential
procedures in caring for those at risk of suicide or self-harm including TTM,
Management of an Offender suspected to be at Risk due to the ingestion of a
Substance (MORS), Notification of Concern (NOC) and the operational readiness of
Crash Packs (first-aid kits). 
TTM live case and reception risk assessment (RRA) audits covering the previous
three months were reviewed and most reported all being in order and no action
being required.  Some actions had been identified such as the pre-case conference
healthcare assessment taking place at the same time as the case conference and
signatures must be added. Actions had been taken to communicate and correct
these issues, however during a review of live TTM cases files the pre-healthcare risk
assessment had been recorded at the same time as the case conference.
There were also some good examples of the process working where a change of
circumstance form was completed indicating an increase of maximum contact
intervals from 60 minutes to 15 minutes. Action taken to ensure consistency with
family engagement was also evident.

Page 178

39 
Minutes from quarterly local suicide prevention meetings over the past nine months
were evidenced, and information was shared from the Suicide Prevention
Coordinator forum at SPS HQ. Safer cells were regularly used for prisoners being
managed under MORS and this was evidenced with nine safer cell checklists
reviewed between February and March 2022. The procedure surrounding
completion of a checklist prior to a safer cell being used appeared well established
and was confirmed by the assurance process. 
MORS was found to be well administered with examples reviewed; the procedure
appeared well established and assurance checks were evidenced. 
Three listeners were operating in the prison and was an appetite to increase the
number of listeners through recruitment and training irrespective of how often
listeners were being accessed by the prisoner population. 
Recommendation 11: HMP Shotts should ensure that prisoners are given the
opportunity to access information on their case file prior to the case conference. 
Recommendation 12: HMP Shotts should be proactive to encourage all
prisoners on TTM to have family engagement and continue to take action to
improve administration matters around completion of TTM case files. 
3.2 The prison takes particular care of prisoners whose appearance,
behaviour, background or circumstances leave them at a heightened risk of
harm or abuse from others. 
Rating:  Good performance 
A PEEP list was provided and the requirements of individuals spoken to confirmed
they should be on the list.  Officers demonstrated good knowledge of the individuals
and the background behind their requirements. 
It was clear that the introduction of the photocopying of prisoner’s mail had reduced
the risk of illicit substances being introduced to the prison.  In the first three months
of 2022 there were 46 occasions of prisoners being managed under MORS
compared to 312 occasions in 12 months of 2021.  This represented a 40%
reduction pro rata. 
There were two individuals who were refusing to return to main circulation. There
was good evidence of positive engagement with officers and the NHS mental health
team who were attempting to persuade them to engage with the rest of the
population. It was encouraging to attend a Prisoner Management meeting, where
they were attempting to transfer both individuals. 
Multi-disciplinary Substance Misuse Meetings started in January and took place
monthly as had Multi-disciplinary Mental Health Team Meetings. These were well
attended, purposeful and an ‘information from prison officers’ section provided
officers with the opportunity to raise concerns about individuals in an appropriate
forum, with relevant stakeholders present. Minutes of both meetings referred to

Page 179

40 
liaison with the NHS Mental Health Team, which was an obvious strength in both
meetings. 
It was clear from speaking to a range of staff that a Health Improvement Practitioner
and Enhanced Addictions Caseworkers were making significant inroads in
communicating with prisoners on both physical and mental health and addiction
services through a number of initiatives.  All opportunities to engage with the
prisoner population were being utilised including a four-week course shared as a
podcast on the prisoner information channel (PIC) with prisoners providing feedback
that they had been using the information shared such as ‘rest and repair’ breathing
exercises.  The Offender Outcomes Unit Manager further intended to introduce
‘Recovery and Support Representatives’ to assist in support of peers. 
Foreign national prisoners reported feeling safe and having their basic needs met.
Reception and Link Centre, in delivering induction procedures, demonstrated use of
global language services both via telephone and in person.  Fife College in the
Learning Centre also aided foreign national prisoners with ESOL courses. 
Fife College in collaboration with the SPS, NHS Mental Health Team, Health
Improvement Practitioner, Enhanced Addictions Caseworker and North Lanarkshire
Council.  Good examples include the NIC Custody Adjustment Support and
Transition (CAST) programme for individuals sentenced to eight years and above;
Health Promoting Friday’s incorporating ‘Neil’s hugs foundation’; ‘library man group’
and ‘trauma (NHS information session). 
Management plans were focussed on reintegrating individuals into mainstream
environments where they had earlier displayed vulnerabilities.  An excellent Lamont
Hall and NIC management plan was evidenced from December 2021, comprising
seven stages of a person-centred approach ranging from planning and engagement
with NHS, providing the individual increasing time in hall to integration and induction
following a consolidation phase allowing reflection and exploration of issues. 
Good Practice 3: Multi-disciplinary approaches in Health Promoting Friday
incorporating ‘Neil’s hugs foundation’, ‘library man group’ and ‘trauma (NHS
information session), etc. 
Good Practice 4: Prisoner Information Channel. Podcasts from positive peers,
Enhanced Addictions Caseworker, NHS advertisements, mental health support,
meditation, self-help, music requests, etc. 
Good Practice 5: Residential staff and PEI based delivery of CAST Pathway
within the NIC incorporating induction, training courses and case conferencing
with input from Fife College, Health Improvement Practitioner and other
stakeholders. 
Recommendation 13: SPS HQ to reconsider with Psychological Services,
return of psychology input into CAST Pathway case conferencing within the
NIC.

Page 180

41 
3.3 Potential risk factors are analysed, understood and acted upon to
minimise situations that are known to increase the risk of subversive,
aggressive or violent behaviour.  Additionally, staff are proactive in lowering
such risks through their behaviours, attitudes and actions. 
Rating:  Generally acceptable performance 
Violence reduction and anti-bullying posters were visible throughout the prison. The
Violence Reduction Strategy was available on the SharePoint site accessible to all
staff. 
HMP Shotts has a Violence Reduction Group (VRG) that reviews violent and serious
incidents that occur. Although well attended, the last meeting took place in
September 2021. During that meeting they reviewed the last five months’ intelligence
and incidents which highlighted a number of recoveries. Further information such as
the updates from the halls contained useful information. 
One violent incident that occurred was tracked in terms of the violence reduction
strategy flowchart.  A comprehensive Residential FLM and Duty Manager overview
had been provided on the VIR form, and a Violent Incident Review panel was
awaited. The strategy document requires the VIR to be submitted to the Intelligence
Management Unit (IMU) within 48 hours after a Violent Incident Review panel is
completed. The IMU advised this was not the case on every occasion, but it was
assuring that the IMU track and issue reminders until the Violent Incident Review
panel is completed, and form submitted. 
A very organised IMU was delivering a well-developed SPS Intelligence Framework
and action dissemination, with proactive and engaging IMU FLM and analyst staff. A
strategic threat assessment was evidenced which identified current threats to the
establishment along with regular Tactical Tasking and Co-ordination Group (TTCG)
meetings.  A prisoner profile was under development for the violent incident that had
occurred. 
Recommendation 14: The Violence Reduction Group should meet more
regularly to review violence reduction and ensure actions are taken, and the
VIR form submitted to IMU following a Violent Incident Review Panel should be
taken to the Violence Reduction Group meeting for consideration as required
by the strategy document. 
3.4 Any allegation or incident of bullying, intimidation or harassment is
taken seriously and investigated.  Any person found to be responsible for an
incident of bullying, intimidation or harassment is appropriately reprimanded
and supported in changing their behaviour. 
Rating:  Generally acceptable 
See QI 3.3 relating to the Violence Reduction Strategy that provided the prison with
a coordinated approach to reducing violence. In the absence of a Violence
Reduction Group meeting since September 2021 there is a general acceptance that

Page 181

42 
the SPS Anti-bullying Strategy ‘Think Twice’ required to be re-launched to ensure
staff were aware and knowledgeable. 
One ‘suspected bullying report (SBR) form’ from April 2022 was reviewed and
actions taken found to meet the standard’s requirements. 
Of the six violent incident report forms submitted since September 2021 relating to
prisoner-on-prisoner assault, on five of the six occasions, individuals were separated
and on two of the occasions a transfer was arranged for a perpetrator. 
An induction package ‘respect me’ along with autism awareness and disability as
well as hate crime courses were delivered within the NIC.  Consideration should be
given to rolling these packages out to the wider prison population, beyond the
dissemination that occurs as men move from the NIC to general population. 
Up until March 2020 a training programme was in place for the SPS Anti-bullying
Strategy ‘Think Twice’, with 40% of staff recorded as trained at that time.  COVID-19
had affected this. 
SPS Anti-bullying Strategy ‘Think Twice’ was included in the induction package,
which continued to be bespoke at this time as the prison emerged from COVID-19
and was covered in the induction booklet provided. 
It was encouraging to attend a Prisoner Management meeting, and see the robust
approach to prisoner need. 
Recommendation 15: SPS Anti-bullying Strategy ‘Think Twice’ requires to be
re-launched to overcome the identified deficits e.g. only 40% of the staff are
trained. Posters should be replenished across the establishment and a re-audit
of incidents should take place to ensure all incidents of bullying, intimidation or
harassment are investigated and taken seriously. 
3.5 The victims of bullying or harassment are offered support and
assistance. 
Rating:  Satisfactory performance 
A number of opportunities for prisoners to appropriately raise concerns or be
identified by staff were evidenced against QI 3.2. Similarly, good staff/prisoner
relationships were demonstrated across the establishment which created an
environment where concerns were more likely to be raised with staff. 
An example of this was observed on one hall when eye contact with a prisoner at
meal time raised suspicions with staff that something was amiss.  The officer took
the opportunity later to speak with him out of sight of other prisoners. In the NIC
inspectors observed an FLM meeting with a prisoner who was in prison for the first
time, where concerns had been raised in relation to demeanour. Whilst no concerns
were identified in relation to bullying or harassment, the FLM was able to offer him
support with the impact that missing his family was having on him.

Page 182

43 
In most occasions the perpetrator of an assault was relocated and only one occasion
the victim was moved. 
3.6 Systems are in place throughout the prison to ensure that a proportionate
and rapid response can be made to any emergency threat to safety or life.
This includes emergency means of communication and alarms, which are
regularly tested, and a set of plans for managing emergencies and
unpredictable events.  Staff are adequately trained in the roles they must adopt
according to these plans and protocols. 
Rating:  Generally acceptable performance 
SOP 202 ‘security staff alarm response’ was provided and described primary and
secondary alarm responders, that were not specifically designated. Personal alarms
carried were separate to the staff radio system. Inspectors noted that SOP 202
‘security staff alarm response’ was past its review date and should therefore be
reviewed. SOP 909 relating to medical emergencies during patrol and night shifts
was also provided, including reference to code red and code blue arrangements
along with arrangements for contacting the Scottish Ambulance Service. 
There was a fully equipped control and restraint (C&R) store in preparation for any
eventuality. The equipment store was well managed, in support of a very organised
command room and further supported by comprehensive contingency plans, log
operating system and CCTV facilities. 
Contingency plans evidenced that there were nominally sufficient number of incident
command role holders to enable HMP Shotts to deal with level two and three
incidents, and a good assurance process that checked that there was suitable
staffing in place. There was no evidence of any desktop or live contingency
exercises within the past 12 months, and the Local Incident Management (LIM)
exercise pre-dated COVID-19. 
Whilst accepting the impact of COVID-19, a review should be conducted to ensure
command role holders are adequately trained and contingency exercise
recommenced. 
HMP Shotts had recently appointed a new Staff Training Manager who was still in
the process of verifying numbers trained in role and competency relating to C&R
refresher training dates.  He reported that COVID-19 had further affected
competencies with only twenty of the required thirty-one C&R advanced trained staff
in post. 
Recommendation 16: Conduct a review of incident command role holders to
ensure consistent and adequate cover for the establishment and that role
holders are adequately trained. 
Recommendation 17: Contingency exercise arrangements to be
reinvigorated.

Page 183

44 
Recommendation 18: Rapid planning is required to ensure a full complement
of advanced C&R trained staff are in post in readiness for a proportionate and
rapid response to any emergency threat. 
3.7 The requirements of Health and Safety legislation are observed
throughout the prison. 
Rating:  Satisfactory performance 
Signed policy statements recognising management responsibility for Health & Safety
(H&S) and Fire Safety were provided.  A Risk Assessment register was available
which could be sourced in the prison SharePoint site along with an excellent suite of
risk assessments and safe systems of work (SSOW). The site could be accessed by
all staff and on reviewing some examples, regular review periods were
demonstrated. Fire risk assessments were evidenced with signatures of the
Governor in Charge and Health and Safety Manager.  Those responsible for H&S
had the required qualifications to carry out their role professionally. There had been
no Scottish Fire & Rescue Service or Health & Safety Executive activity in recent
years and no respective audit actions. 
Excellent workplace inspection records existed, which showed all departments being
inspected monthly between April 2021 and April 2022, except one department on
two separate occasions.  An assurance report was completed weekly by FLMs that
included quality of cell searches, operational readiness, checks of crash packs and
C&R equipment. It incorporated a Unit Manager check and contributed to an
assurance regime, as did completion of three PRL audits on a monthly basis, co-
ordinated by the Business Improvement Department. These scheduled programmes
created a culture of assurance and contributed to the compliance and H&S agenda
across the prison. 
H&S Committee had met of six occasion in the previous fifteen months. Whilst
minutes of two meetings held in 2022 evidenced union and senior management
attendance, it was evident that there was no FLM, residential officer or estates
manager in attendance.  The H&S Committee should consider inviting them to attend
in order to ensure appropriate consultation with all employees. 
Accident investigation procedures were in place where responsible managers were
provided 14-days to return an investigation into any reported accident. 
Evidence provided relating to fire evacuation exercise, were from 2018 and
subsequent records advised that the Governor in Charge had instructed exercises
be postponed as a result of COVID-19. No evidence of replacement activities such
as briefings or toolbox talks was provided. 
The culture of H&S was observed within the workshops as outstanding and an
example of good practice, particularly arrangements around machine safety,
signage, risk assessment and training. Work units and outside areas visited were
clean to a very high standard, role modelled by the whole team responsible for the
department.

Page 184

45 
An impressive training regime was evidenced covering a number of prisoner training
courses that included H&S manual handling, fire awareness, hand-injury awareness
and emergency response.  Safety documentation available included risk
assessments and SSOWs that had been reviewed in the past 12 months, along with
noise assessments where the hazard had been identified. Although these
assessments should have been reviewed in 2021. 
A ‘Shotts safety tracker’ was evidenced with some open actions relating to a lack of
first aiders from 2021 and an issue from 2018 relating to prisoners using bedding
they had been able to purchase/be issued, which didn’t meet rating standards in line
with the SPS Fire Safety Manual and UK fire prevention regulations. HMIPS
recommend action is taken to progress and appropriately close these actions. 
Good Practice 6: Management of H&S across the regimes department
including risk assessment, SSOW and training arrangements. 
Recommendation 19: Fire evacuation drills should re-commence as soon as
reasonably practicable, supported by briefings where necessary to ensure staff
are proficient in procedures. 
Recommendation 20: Noise Assessments should be reviewed by a
competent person.

Page 185

46 
STANDARD 4 - EFFECTIVE, COURTEOUS AND HUMANE EXERCISE OF
AUTHORITY 
The prison performs the duties both to protect the public by detaining prisoners in
custody and to respect the individual circumstances of each prisoner by maintaining
order effectively, with courtesy and humanity 
The prison ensures that the thorough implementation of security and
supervisory duties is balanced by courteous and humane treatment of
prisoners and visitors to the prison. Procedures relating to perimeter, entry
and exit security, and the personal safety, searching, supervision and
escorting of prisoners are implemented effectively.  The level of security and
supervision is not excessive. 
Inspection Findings 
Overall Rating:  Satisfactory performance 
In this standard, one quality indicator was rated as good performance, six were rated
as satisfactory performance and three were rated as generally acceptable
performance, giving an overall rating of satisfactory performance. There was one
example of good practice and six recommendations for improvement. 
HMP Shotts felt secure with regards to security both within the residential areas,
regimes buildings and around the perimeter.  There was a good suite of relevant
SOPs available to assist staff in their understanding of what was required to carry
out their role. There was also good evidence of assurance processes and risk
assessments.  HMP Shotts was still working through the consequences of the
COVID-19 restrictions, with low numbers attending work or education.  As
restrictions ease the numbers moving around the prison will increase. Staff will need
to adjust to the large movement of prisoners, particularly those who have joined
since the pandemic and have not experienced this before. A priority for HMIPS is to
encourage HMP Shotts to increase staff that are competent in Control and Restraint
(C&R) and Personal Protection Training (PPT). 
In terms of the PANEL principles for this Standard: 
Participation: It is fundamental that prisoners feel part of the process and not the
subject of it. This was evident when looking and observing reintegration or
management plans for the SRU, self-representations at discipline hearings and case
conferences, as well as case conferences relating to Special Security Measures
(SSM). Prisoners reported that they had been communicated to with regards to
decision taken about them, and were aware how and when to challenge these
decisions as seen in one discipline hearing. 
Accountability: Individualised reintegration plans were evident where discipline
hearings were observed.  Judgements and punishments were on a case to case
basis with no apparent use of a tariff system.  There were assurance systems in
place for sample cell and area searching, but this was not always completed.  There
was robust assurance in regard to vehicle and perimeter searching with good

Page 186

47 
assurance processing place.  There was a process in place to assure that C&R
removals were legitimate and lawful, however some planned removals had not been
recorded and were not mitigated by the Head of Operations. 
Non-discrimination and equality: There was no evidence of any discrimination
against prisoners. There was no evidence of targeting of particular prisoner cohorts
either in searching or drug testing.  It was pleasing to see the care taken with those
that were most at risk to ensure that their rights were upheld and that measures,
such as those reported in QI 4.4, were only in place for the minimum amount of time. 
Empowerment: Discipline hearings and case conferences supported prisoners in
allowing them to understand the actions taken against them.  There was time taken
to explain decisions and the actions prisoners could take if dissatisfied with any
outcomes.  Inspectors found that generally prisoners understood why they were
being managed in a certain way, and what was expected of them to turn their
situations around, particular when being managed under rule 95 
Legality: For this standard it was clear that prisoners held under various rules or
procedures were done so lawfully.  With regards to the possession of illegal items,
the prison was proactive in restricting the introduction of these items both through
the vehicle lock and the perimeter.  Although there is a caveat of COVID-19 and the
importance of social distancing, it was found that in some cases staff involved in a
C&R removal were past their refresher dates.  However, the removals were carried
out as per C&R guidelines. 
Encouraging observations 
 The areas around the perimeter were clear of rubbish, maximising the
opportunity to recover illicit items thrown over the perimeter. 
Emerging concerns 
 HMP Shotts should look to increasing the C&R competency of their staff to the
accepted level as a priority.
 HMP Shotts must ensure that all planned removals are recorded unless there
is reasonable mitigation
 The Prison Monitoring and Assurance Group (PMAG) should intervene and
take the decision as to where a prisoner should move to when it is clear that
prisoner cannot be reintegrated into the holding prison.
 HMP Shotts should ensure that all cells are searched at least once per quarter
and consider carrying them out at different times.

Page 187

48 
Quality Indicators 
4.1 Force or physical restraints are only used when necessary and strictly in
accordance with the law. 
Rating: Generally acceptable performance. 
Force or physical restraint, known as Use of Force (UOF) must be undertaken in
accordance with Rule 91 of the Prisons and Young Offenders Institutions (Scotland)
Rules 2011. 
UOF did not appear to be overused. All were checked by the Head of Operations to
ensure compliance, with an initial check carried out by the IMU.  Any trends or
hotspots where UOF had been used were then highlighted to the Tactical Tasking
and Coordination Group for any action. 
Staff were guided by a UOF SOP as well as an SOP regarding the video recording of
removals, a requirement when the removal is planned. Both SOPs were accessible
via the local SharePoint site. 
The IMU kept a database of all removals, along with any video footage linked to
planned removals and it was retained for the required three-year period. The
camera used to record UOF was stored in an area easily accessible by an FLM. Ten
UOF were checked from the last 12 months. The report writing was of a good
standard and highlighted any issues staff experienced, when change overs occurred
and the reasons as well as where staff were replaced to uphold the guidelines about
searching. On three occasions when the UOF was planned, there was no footage
available and no mitigation offered. 
On a number of occasions nurses were not available to assess the prisoner once the
removal was completed. This was either due to the time of the removal i.e. after
18:00 when there were no NHS staff in the prison, or due to NHS staff shortages.
However, there was evidence that C&R removals had been recorded when checking
the IMU data base. An inspector also viewed a live removal from the Electronic
Control Room (ECR). It was clear that it was managed well with the removal being
recorded. 
Under SPS PRL 2.3.4.2: Control & Restraint, only prison staff assessed as
competent to do so took part in C&R removals.  A concern for HMIPS was the level
of staff competence in C&R.  Staffed trained in C&R phase one was at 53% with
C&R phase 2 at 86%, and those required to be competent in PPT was at 16%. Staff
involved in UOF were checked against staff training records. Two FLMs supervising
a removal and seven staff who took part in a removal were out of competency.
However, this was during COVID-19 where social distancing was being adhered to
and C&R training had not taken place. Staff competency in C&R needs to be
addressed as a priority. 
Recommendation 21: HMP Shotts should increase the C&R competency of staff to
the accepted level as a priority.

Page 188

49 
Recommendation 22: HMP Shotts must ensure that all planned removals are
recorded unless there is reasonable mitigation. 
4.2 Powers to confine prisoners to their cell, to segregate them or limit their
opportunities to associate with others are exercised appropriately, and their
management is effected with humanity and in accordance with the law.  The
focus is on reintegration as well as the continuing need for access to regime
and social contact. 
Rating: Generally acceptable practice 
When inspectors visited the SRU it was almost at full capacity.  This had been the
case for some time other than for short periods where numbers had dropped slightly.
When inspecting the SRU, 14 prisoners were located within the Unit.  Nine were on
rule 95(11), three on rule 95(12), including one prisoner on special security
measures (SSM), and two were on a refusal to return to association (RRA) following
the end of their rule, one of which had been on a RRA for a 92 days.  A sample of
rule 95(11) and 95(12) rules were checked on PR2 where prisoners had been in the
SRU for between 18 to 116 days.  All prisoners were found to be held lawfully, case
conferences, self-representations and narratives had been downloaded into the
Community Integration Plan (CIP) on PR2. The narratives were of good quality and
there was at least one record for each week. If something significant occurred this
was recorded at the time. 
Each prisoner had an individualised reintegration plan for returning to a residential
area or their move to another SRU.  However, there appeared to be some difficulty in
moving prisoners out of the SRU, even to their prison of allocation. One example
showed the prison attempting to move a prisoner to a number of prisons without
success. Work needs to done to assist in moving prisoners between SRUs, The
Prison Monitoring and Assurance Group (PMAG) should take a more active role in
deciding transfers, preventing long term stays in SRUs and inhibiting the potential for
a return to normal location. 
Prisoners reported a good understanding of their situation and confirmed that they
had received their entitlements of access to fresh air, a shower, the satellite
gymnasium and the phone, with most having access to in cell telephony.  All
prisoners had access to visits as well as a virtual visits console within the Unit.
However, prisoners could not access evening visits due to the SRU being on patrol. 
The SRU had a reasonable book and CD library along with a selection of clothes and
trainers for those who arrived with no belongings.  There were a number of prisoners
held under rule 95 in the residential areas, their regime was checked and confirmed
that they were receiving their entitlements. 
HMIPS were informed that recently the prison had increased the operational capacity
to include some cells in the SRU.  If a prisoner was removed to the SRU and placed
on a rule 95(11), his cell was cleared and filled by a transferred prisoner and
therefore no longer allocated to him.  If it was deemed appropriate to revoke the rule
earlier than planned it was difficult to re-integrate the prisoner as he no longer had a
cell to go to, and therefore prisoners may be held in the SRU longer than necessary.

Page 189

50 
HMIPS are of the view that the SRU cells should not be part of the occupancy level
of a prison. Every prisoner allocated to that prison must have a cell to return to at
whatever time was deemed appropriate and not risk being kept in an SRU longer
than necessary. 
Recommendation 23: The PMAG should intervene and take the decision as to
where a prisoner should move to when it is clear that a prisoner cannot be
reintegrated into the holding prison. 
Recommendation 24: SPS HQ should consider reducing the occupancy levels at
HMP Shotts so as not to include the SRU. 
4.3 The prison disciplinary system is used appropriately and in accordance
with the law. 
Rating: Satisfactory performance 
HMP Shotts had held approximately 550 disciplinary hearings since the 01 January
2022.  It was reported that since the introduction of photocopying prisoners personal
mail the number of disciplinary reports had reduced.  During the inspection a number
of hearings were observed and were found to be well run. Where prisoners were
included, they articulated that they understood the process, confirmed they had
received the charge within the specific time and were clear on the outcome. Where
a punishment was deemed appropriate they understood how to appeal the outcome.
Where a prisoner challenged the legality of the report, the adjudicator suspended the
hearing in order for an investigation to take place. 
The paperwork was completed as per SPS guidelines on disciplinary hearings 2018,
and although some of the narratives could have been more explanatory the
adjudicators worked well with the information they had. 
A local adjudication audit is carried out by the Deputy Governor on 10 random cases
per month. This audit revealed a number of examples where the paperwork was not
up to standard and was actioned to remedy the mistakes. The Deputy Governor
also ensured he observes at least one disciplinary hearing for each adjudicator
annually.  A recent PRL audit undertaken in April 2022, indicated 100% compliance,
with good narratives and evidence downloaded. 
Inspectors also observed the process undertaken where a prisoner did not wish to
attend and had pleaded guilty in their absence. This process was followed well. 
4.4 Powers to impose enhanced security measures on a prisoner are
exercised appropriately and in accordance with the law. 
Rating: Satisfactory performance 
HMP Shotts had six prisoners on enhanced or SSM in the past 12 months and had a
useful SSM flowchart to ensure compliance with the policy.  During the inspection
there was only one person on SSM, who was located in the SRU and had been
under these measures for an extended period of time. The SSM was well

Page 190

51 
documented and had described various stages of these measures, from having to
have three officers attend to him wearing full PPE to a stage where he was being
managed under normal SRU conditions unless he left the Unit.  At this point he was
subjected to the hand cuffing policy and this measure was accepted as the correct
action to take at this stage to manage his risk.  Reading the narratives, it was clear
that risk assessments had continued to be utilised in efforts to reduce the SSM. The
prisoner had attended most cases and there was evidence that there was a person
centred approach. Inspectors attempted to engage with the prisoner but he
declined. 
4.5 The law concerning the searching of prisoners and their property is
implemented thoroughly. 
Rating: Generally acceptable practice 
The regularly searching of prisoners and their property is necessary to ensure the
safety and wellbeing of all prisoners and staff, and to minimise the threat to stability
of the prison. It is the HMIPS view that it is also important that searching is not
targeted to certain individuals without due cause.  HMIPS were content that this was
not an issue at HMP Shotts. Recently, the process that all cells should be searched
at least once every quarter had been reintroduced after a period of time during the
pandemic where the SPS had reduced searching significantly in order to adhere to
social distancing. All areas had a searching record that annotated when cells and
areas were searched, and although there was a weekly audit carried out by a
residential FLM to ensure compliance, the completion of quarterly searches had not
always taken place. 
Apart from tactical searching most prisoners and their property appeared to be
searched at the same time every day.  This could present a risk whereby prisoners
could ensure their cells were clear of any illicit items during this time. HMIPS would
ask HMP Shotts to consider carrying out quarterly searches at random times of the
day rather that at the same time. 
An SOP on prisoner searching was available for staff to reference in SharePoint,
which outlined the requirement for any search to be person-centred and to
encourage positive engagement. Due to limited opportunities to observe a search
this was not tested. When asked, prisoners confirmed that searches had taken
place, that it was to help keep them safe and that they had been conducted fairly.
There was no evidence of any complaints around searching. 
The National Dog Unit was utilised regularly and was on site during the inspection.
However due to its workload, booking them to attend could be difficult. When
possible, the prison uses them to search cells, mail, staff and prisoners as well as
visitors. They can also be used purely as a deterrent, and its HMIPS view that it
would be beneficial if the prison had their own dog unit to utilise on a daily basis. 
Recommendation 25: HMP Shotts should ensure that all cells are searched at least
once per quarter and consider carrying them out at different times.

Page 191

52 
4.6 Prisoners’ personal property and cash are recorded and, where
appropriate, stored. The systems for regulating prisoners’ access to their own
money and property allow for the exercise of personal choice. 
Rating: Satisfactory performance 
HMP Shotts transferred prisoners in from other prisons, therefore property and
personal cash was already recorded in the SPS systems. 
All property arriving in reception was checked but not always in the presence of the
prisoner. Due to COVID-19 restrictions still being in force, space was limited. If
there were more than two prisoners arriving at the same time, prisoners did not stay
in reception other than to fulfil the basics requirements of the admission process.
This allowed prisoners to be removed from the escorting transport as quickly as
possible.
After completing the property check, the prisoners card was brought to the
residential area to be signed by the prisoner. There did not appear to be any issue
with prisoners not being present, but the reception will revert to previous practice
once guidelines allows.  Any issues the prisoner had about missing items was dealt
with by a residential officer.  In most cases there would be a request for the previous
property card to be scanned to the prison to check against what had arrived. 
It would be helpful if it was common practice for a copy of the previous property card
to be included with the transfer documentation. 
One issue that reception found was there were no national items in use list. This
could cause issues, particularly when a prisoner arrived from another prison with
items not permitted in HMP Shotts. 
Prisoners were able to access their property through a request book on the hall,
which was supported by an SOP that outlined the various reasons why prisoners
may wish to do so. Any property arriving in the reception was dealt with when time
allowed, normally on the same day which resulted in no back log. Single items such
as a watch were taken up to the prisoner for allocation, with items such as footwear
required to arrive at reception before being replaced. This process was a result of
previous incidents where prisoners had not handed in their old footwear.  Any cash
arriving in the mail was managed through a robust recording system. Prisoners
family and friends could transfer money electronically which arrived at SPS HQ. The
amounts received were then distributed to each prison, and the prisoners personal
cash account updated. In both cases the money was in the prisoners account on the
same working day. 
Due to COVID-19 restrictions it was not possible at this time to hand in cash or
property at the prison. This meant that families had to pay for deliveries and it was
difficult if purchases need to be returned, which could also be costly. 
The valuable property is held in a bag in a lockable cabinet, and were individually
listed on the prisoner property card.  However, these bags were not sealed.  New
bags had been purchased with seals but were not large enough to hold some
prisoner’s valuables. New bags had been ordered.

Page 192

53 
The key for the valuables cabinet was kept in a safe with a pin code.  However, this
was accessible by multiple staff, including the night shift manager, where the car
keys were held. When HMIPS raised the risk of too many staff having access to the
safe the prison reacted positively and purchased another safe for reception use only. 
Recommendation 26: SPS should consider including a copy of the sending prison
property card with the transfer documentation. 
4.7 The risk assessment procedure for any prisoner leaving the prison
under escort is thorough and implemented appropriately.  Any restraint
imposed upon the prisoner is the minimum required for the risk presented. 
Rating: Satisfactory performance 
The risk assessment procedure for any prisoner leaving the prison under escort was
thorough and implemented appropriately.  An FLM, when picking the escorts,
ensured that the person in charge was out of probation. Gender balance was also
taken into account for searching and medical procedures. 
The FLM carried out an assessment of the escort using PR2, and also consulted the
enhanced escorting list for those requiring special procedures. The list had good
information to help understand the issues that could arise while out on escort.  A
personal escort approval certificate/risk assessment was attached to the PER.  The
sheet included information of the past history of escorts, risks factors, rationale for
hand cuffing, instructions if the prisoner becomes unruly. If hand cuffs were to be
removed due to a medical request, the action the escorting team should take was
included. Where an enhanced escort was to take place the police were contacted.
The receiving hospital was also contacted for all escorts. 
A review of the frequently used locations was carried out by the IMU, and although
this has not been undertaken for some time, inspectors were satisfied that nothing
had changed since the last review. 
4.8 The law concerning the testing of prisoners for alcohol and controlled
drugs is implemented thoroughly. 
Rating: Satisfactory Performance 
HMP Shotts did not test for alcohol but had a Mandatory Drug Testing (MDT) Unit. 
Inspectors visited the MDT which was staffed full-time Monday to Friday, by three
staff. Prior to COVID-19 the prison was able to test approximately 1500 per year,
and although this had dropped during the pandemic it appeared they had kept up
with demand testing of 630 in 2021.  At the time of the inspection they had tested
295. The MDT Unit tested prisoners for various reasons including for progression,
where prisoners were tested within three months of transferring to the National Top
End or open conditions, for Integrated Case Management (ICM), for enhanced work
sheds, those who had been identified through intelligence reports, suspicion and on

Page 193

54 
the request of a prisoner. There did not appear to be any discrimination in the
testing process whether it was targeted testing or for those requiring it. 
Although the process was not tested in a live situation, inspectors were taken
through the MDT process and were satisfied that it was fair and lawful.  Staff were
very experienced. They were able to demonstrate the process well and explained
the steps taken dependant on the test result. There were no recent records of
complaints about the MDT process. 
4.9 The systems and procedures for monitoring, supervising and tracking
the movements and activities of prisoners inside the prison are implemented
effectively and thoroughly. 
Rating: Satisfactory performance 
Inspectors observed the movement of prisoners to work and education on numerous
days during the inspection.  Although numbers were not at the level pre-COVID-19,
the route was well controlled and effectively supervised. 
FLMs from regimes were responsible for the movement off prisoners to and from the
work areas.  Each hall was moved in a controlled manner to minimise the risk of
enemies meeting and to keep mainstream and protection prisoners apart. In most
cases each work party was escorted by the officer in charge of that workshop and
repeated at the end of the work period.  Those going to education was picked up
prior to the route moving by the education operations officers. 
All prisoners walked through a metal detector when leaving the residential areas and
on returning from their place of work or education.  All prisoners leaving work parties
were hand wanded on exit and then walked through a metal detector.  A percentage
of which were asked to walk past the cell sense detector.  If any prisoner was
carrying anything of bulk, they were required to put this through the x-ray machine.
There was no mandatory strip searching during route movements, but where
required the prisoner was taken to the reception area to be searched. 
Inspectors also observed the process for moving prisoners who were at risk i.e. from
the SRU, and this was also completed in a controlled manner.  Good
communications within the prison was observed allowing the transit of those
presenting a risk to be safe. 
4.10 The procedures for monitoring the prison perimeter, activity through the
vehicle gate and for searching of buildings and grounds are effective. 
Rating: Good performance 
An inspector accompanied officers during their perimeter security checks, which
were carried out on a minimum of three occasions per day, covering the early, back
and night shift.  On the perimeter checks a member of staff from each shift carry out
a observational check of the perimeter fencing, with each staff member undertaking
a third of a physical check known as a ‘push and pinch test’, checking the integrity of
the perimeter, ensuring that a complete physical check is carried out every 24 hours.

Page 194

55 
During the perimeter checks it was also observed that officers ensured that all
vehicles were locked, and that there were no illicit items thrown over the walls.  It
was noted that there was no rubbish on view and therefore it was easy to spot
packages that had been thrown over the perimeter.  Any items found were placed in
a production bag and sent to the IMU accompanied by a report from the officer,
detailing the find. This is important in tracking the most vulnerable points for
packages to be thrown over, days and times. 
The perimeter checks were also observed from the ECR.  The ECR kept a record of
checks and they were uploaded onto the SharePoint site, with an FLM checking
them at least once per week. 
The access and egress of vehicles was observed.  Staff communicated well with the
drivers and ensured that they followed the guidelines with regards to identifying
themselves and items not permitted i.e. personal communication devices.  Once the
staff member was content with the drivers credentials a thorough search of the
vehicle took place, which was carried out when the vehicle left the prison.  A number
of search aids were at the disposal of the member of staff. When GEOAmey
transport visited the prison a list of all registration numbers were available to staff,
and if the number was not in the list then the transportation would be refused entry
and the company contacted. 
A number of SOPs covering all aspects of this QI were available for reference by
staff. 
Good practice 7: The areas around the perimeter were clear of rubbish maximising
the opportunity to find items thrown over the perimeter.

Page 195

56 
STANDARD 5 - RESPECT, AUTONOMY AND PROTECTION AGAINST
MISTREATMENT 
A climate of mutual respect exists between staff and prisoners. Prisoners are
encouraged to take responsibility for themselves and their future. Their rights to
statutory protections and complaints processes are respected. 
Throughout the prison, staff and prisoners have a mutual understanding and
respect for each other and their responsibilities. They engage with each other
positively and constructively.  Prisoners are kept well informed about matters
which affect them and are treated humanely and with understanding.  If they
have problems or feel threatened they are offered effective support.  Prisoners
are encouraged to participate in decision making about their own lives. The
prison co-operates positively with agencies which exercise statutory powers
of complaints, investigation or supervision. 
Overall Rating:  Satisfactory performance 
In this standard, one quality indicator was rated as good performance and seven
were rated as satisfactory, giving an overall rating of satisfactory performance.
There was one example of good practice and one recommendation for improvement. 
The overall impression at the time of the inspection was of a calm and well run
establishment. Staff and prisoner relations appeared positive with a light and friendly
atmosphere in most areas.  Staff and prisoners addressed each other by their first
names and appeared to have good relations.  The regime was still restricted
somewhat by COVID-19 however there were opportunities for all prisoner groups to
spend significant time out of their cells whether attending work parties, education,
PT, exercise or general association on the hall.  It was noted that with the exception
of mealtime numbers checks, the halls were generally unlocked for most of the day.
This was appreciated by the prisoners having been restricted for much of the last two
years. 
Activities such as education and PT are timetabled by flat to preserve the internal
COVID-19 bubbles. This has worked well and has been scheduled to limit clashes
where a particular flat would have two activities offered at the same time. 
There continues to be disruption within the work parties due to offender outcomes
staff being deployed to the halls to cover staff shortages in the residential areas.
This is in turn limiting opportunities for prisoners to engage in meaningful activities
on a regular basis. In addition, there are no opportunities for protection prisoners to
engage in enhanced workshops that would increase their wage earning potential. 
The PIC is very impressive and contains a broad mix of programming interspersed
by adverts and announcements for internal courses and opportunities.  In addition, it
carries instructional videos to assist prisoners with using the kiosk system and
carrying out a lateral flow test among other things. 
During the inspection there were no IPMs on site however staff and prisoners were
aware of who they were and information on how to contact them was displayed

Page 196

57 
clearly in all halls.  It was stated by one individual in particular that having left a
message on the prison phone system the IPMs got in touch quickly to discuss his
issue.  Prisoner Complaint Forms were freely available on all flats and there was a
robust recording system in place to track the complaint from beginning up to external
remedies where required. 
In terms of the PANEL principles for this Standard: 
Participation.  Prisoners were fully involved in the ICM and Risk Management
Team (RMT) process with regard to pre-release and progression. Families
were invited to participate in the ICM process at the behest of prisoners. There
had been no PIAC meetings since the start of COVID-19 and this had led to a
reduction in user voice with regard to the current regime. 
Accountability.  Progression was a common complaint and echoes the
number of complaints received by HMIPS where progression is seen as unfair.
Delays in assessment and offending behaviour programme availability are
issues for both HMP Shotts and SPS HQ. 
Non-discrimination and equality.  The current regime for education, PT and
programmes allows equal opportunity for all prisoners to attend these sessions.
Protection prisoners did not have the opportunity to attend the enhanced work
party and were therefore denied the chance to increase their wage earning
potential. 
Empowerment. Given that the population of HMP Shotts was long-term
prisoners, the opportunities for support and engagement was clear across the
establishment. 
Legality.  There were no issues found around this point. 
Encouraging observations 
 The current regime has been designed to minimise clashes between education,
PT and exercise sessions. This reduced the times where an individual would
have to forgo one activity to attend another.
 The PIC currently in use was of a very good standard and was well maintained
by two individuals, with support from the education department. 
Emerging concerns 
 A Recovery Café and Whole Mind Café were previously facilitated in the
Tabernacle (TAB) within the Links Centre to support individuals with addiction
and mental health issues.  Since COVID-19 began these had not been held.
 Not all prisoners fit to work were currently required to do so. This had raised
some concern with regard to motivating individuals when a return to a full regime
was implemented.  Certain work parties were also operating sporadically at
times due to shortages in the residential areas.
 Programme delivery currently runs alongside the national waiting lists which
could cause delays in getting programmes started due to availability of transfers

Page 197

58 
from other establishments to fill the classes.  This was having an impact on the
number of courses that can run in the year.  This is causing concern for all
prisoners.

Page 198

59 
Quality Indicators 
5.1 The prison reliably passes critical information between prisoners and
their families. 
Rating:  Satisfactory performance 
Prisoners were afforded the opportunity to phone their family by the hall
staff/manager following transfer. This was particularly important for individuals
returned to closed conditions from HMP Castle Huntly, as generally these transfers
were not pre-planned and the opportunity to contact family prior to transfer would be
limited. 
Discussions with residential staff evidenced that contact between prisoners and
families was such that it would more often be the prisoner who was passing
information to staff in respect of ill health or bereavement of a family member.  This
information was generally received by the prisoner or a request would come from
outside, usually via the ECR, for the individual to phone home.  It was suggested that
in the majority of cases the prisoner would be expecting such news and would be
prepared for it. The hall staff would discuss this situation in private and remind the
individual of support available including the chaplaincy service and listeners. In the
event of a death of a relative, the relevant paperwork would be commenced and
used to confirm details and inform the process should the individual request to attend
the funeral. 
Family members were regularly invited to participate in the RMT process, and the
sharing of this information was conducted following written confirmation from the
prisoner. The prisoner provides the details of who they wished to be invited into this
process. 
Information was available on hall notice boards advising prisoners that Families
Outside could offer assistance to register and set up friends and family on the Virtual
Visit platform. The Link Centre officer and Family Contact Officer (FCO) promoted
family contact through physical and virtual visits, and could link with Families Outside
to support friends and families if required.  Information from the Links Centre Officer
suggested that they work with the FCO promoting and supporting family contact.
This was facilitated through the induction process and in the visitors waiting area
where staff interact with friends and family prior to visit sessions.  There was no FCO
on duty during the visit as one was on leave and the other had been reassigned to
another role due to staff shortages; worryingly this appeared to be an ongoing
situation. 
5.2 Relationships between staff and prisoners are respectful.  Staff
challenge prisoners’ unacceptable behaviour or attitudes and disrespectful
language or behaviour is not tolerated. 
Rating:  Satisfactory performance. 
During discussion with both staff and prisoners there was a reciprocal feeling of
mutual respect and healthy relationships. There were no issues around

Page 199

60 
unacceptable behaviours or language during the visit.  Interactions were jovial and
good natured. An individual had a request regarding when he would receive an
Xbox that he had ordered, staff contacted the reception and were able to provide an
update that the item was in reception and would be issued later in the day.  The
prisoner was content that this had been checked and that there was a positive
outcome. 
A number of visits to the SRU by the team throughout the inspection reported that
relationships appeared to be generally positive, and that the area was calm and the
staff appeared relaxed and confident. 
Offender Outcomes staff appeared to have positive relationships with those in the
work party. All individuals were engaged in their respective tasks and the workshops
had a general air of productivity with a relaxed atmosphere. There were no obvious
examples of inappropriate interaction during the visits.  Two sheds were closed due
to staffing issues in the halls. This had been a regular occurrence. 
5.3 Prisoners’ rights to confidentiality and privacy are respected by staff in
their interactions. 
Rating:  Good performance 
During the visit there were various interviews being conducted on the halls from
chaplaincy support, the Imam and NHS colleagues.  All of these interactions were
conducted in side rooms offering appropriate levels of confidentiality and privacy.
Prisoners also sought and were granted permission to use these rooms while
conversing with the inspection team.  During discussions, interview room doors were
closed in order that the conversations or treatments remained private.  Prisoners
were called down to the desk by name however no details of what they were
required for were relayed in this manner. This information was passed once the
individual had reached the main desk.  In most cases the individual was aware of
who was looking for him or where he was required to go, i.e. visits/surgery. White
boards and desks appeared clear of individual’s personal details and paperwork. 
5.4 The environment in the prison is orderly and predictable with staff
exercising authority in a legitimate manner. 
Rating:  Satisfactory performance 
There appeared to be limited interactions between staff and prisoners, however they
were conducted in an appropriate manner.  While some individuals were at work or
at exercise at various times during the inspection, those left on the hall appeared to
be content filling their time with social activities such as pool and snooker or in the
company of their peers either in cell or in the communal areas. Those on the hall
were happy to report that they spent more time out of cell in general association with
the current regime than before COVID-19. They were generally only locked up for a
numbers check prior to meal times.

Page 200

61 
Following complaints HMIPS received regarding staff dealing with an incident in the
NIC earlier this year, CCTV was viewed and the incident was explained by the IMU
manager. It would appear from the footage that this situation could have escalated
had it not been for the swift and professional actions of staff. There were no
concerns that this incident was dealt with in a heavy handed way and staff acted
appropriately given the seriousness of the situation. 
Throughout the visit staff interacted with prisoners in an appropriate manner and
were happy to take time to discuss any issues with an individual and explain the
rationale behind the decision making process. 
There were issues around the restricting of work parties either due to social
distancing in the workshops or Offender Outcomes staff being utilised to run the
residential regime. This led to a stop/start approach in some work areas which was
unsettling for individuals who relied on routine. 
5.5 Prisoners are consulted and kept well informed about the range of
recreational activities and the range of products in the prison canteen as well
as the prison procedures, services they may access and events taking place.
The systems for accessing such activities are equitable and allow for an
element of personal choice. 
Rating:  Satisfactory performance 
Various posters were displayed on noticeboards advertising support groups such as
AA/CA/Recovery Café/Whole Mind Café. These were accessed by asking hall staff
to contact the relevant facilitators. At present only AA and CA were taking place.
The Recovery Café and Whole Mind Café had been curtailed due to COVID-19 and
had yet to restart. 
There were further outlets for information sharing on the hall kiosk system. Staff on
duty at the time appeared not to be well informed about the system or how to access
it. The most that they could confidently do was print out menus which was done on
an app on SPIN terminals not on the kiosk. No one had a staff login that could
demonstrate the options available.  One prisoner was asked to demonstrate the
system and was very competent and complimentary about its functionality.  He
shared that the younger prisoner group were supporting those that were not as well
versed with technology. 
There was a PIC available to all that had been very well set up by two prisoners.
This PIC automatically plays a weeks’ worth of content.  It was set up to show
various programmes from documentaries to comedy shows and films.  In the “ad
breaks” between shows the two individuals who run the system had made short
presentations showing education opportunities/courses/how to videos for the kiosk
system and lateral flow testing among other information. The clips were animated to
keep them engaging for the target audience. The system also played podcasts
created in education which again had added graphic content to make them more

Page 201

62 
appealing to the viewer.  This is considered good practice and a model that could be
copied in other establishments. 
Good Practice 8: PIC showing clips including how to use the kiosk systems 
5.6 Prisoners have access to information necessary to safeguard
themselves against mistreatment. This includes unimpeded access to
statutory bodies, legal advice, the courts, state representatives and members
of national or international parliaments. 
Rating:  Satisfactory performance 
Copies of prison rules were available from staff in the halls for prisoner use.  In
addition, the prison library was well stocked with reference materials including:
Prison Rules and Directions, European Prison Rules, SPS Operating Standards,
Prisoner and Criminal Procedure Act, Data Protection information, European
Convention on Human Rights Legislation. 
Legal representative visits were booked and accessed through the visit area.  These
appointments were conducted either face-to-face or virtually.  In general face-to-face
visits were conducted in the closed visit area, however legal representatives
requiring to go through paperwork could request a larger non-segregated area in
which to conduct the meeting.  During the inspection the area was visited twice and
on both occasions it was virtual meetings taking place. These appeared to be
progressing with no technical issues. 
Court appearances could also be conducted in this area via a dedicated video link.
During the visit period there were no court hearings viewed. 
5.7 The prison complaints system works well. 
Rating:  Satisfactory performance 
Prisoner Complaint forms (PCFs) were freely available in halls and staff were aware
of where to find them on SharePoint should they require more copies. The process,
stages and relevant timescales were displayed within the halls on noticeboards. 
Some individuals were less than assured by the complaints process and stated that
they would ask for a photocopy of the complaint in order that they could evidence
submission of the form as they often disappeared. As there was no paper trail in this
instance there is no way to confirm if it was actually happening. Staff on the flats
would, in most cases, attempt to resolve any issues prior to the need to submit a
formal complaint. 
HMIPS highly recommends extending the use of the kiosk stem to include a
complaints process. 
A selection of PCF 1 and 2 forms were sampled. They all appeared to be well
managed. A date stamp on the front of the form indicated when the complaint had
been received from the FLM and further action dates such as Internal Complaints

Page 202

63 
Committee (ICC), GIC, etc. These appeared to be followed through in a timeous
manner up to the completion of an ICC where appropriate. The spreadsheet allowed
for tracking of the complaint through to the Scottish Public Service Ombudsman
(SPSO) for action. The responses appeared to be relative and proportionate to the
complaint. There were instances of multiple complaints from the same individual on
a similar vein submitted on the same day.  All of them were answered individually
and appropriately. Once a complaint had been received the details were logged on
a spreadsheet and scanned to a file on SharePoint. The spreadsheet was
completed for all stages of the process and any complaints that were still active were
highlighted in red text. 
On at least one occasion, related to the removal of a mobile phone, the governor
upheld the reasoning of the ICC in rejecting the appeal however indicated that the
handset should be returned to the individual to allow continued family contact. 
Recommendation 27: Consideration should be given to extending the kiosk system
to include an electronic complaints process. 
5.8 The system for allowing prisoners to see an Independent Prison Monitor
works well. 
Rating:  Satisfactory performance 
All halls had information displayed promoting the services available and contact
details of the IPMs. IPMs could also be contacted for free via the PIN phone system
and the prison issue mobiles. Individuals spoken to during the visit reported that the
system was working well and IPMs responded to messages in a timely manner.
While information was displayed on notice boards there did not appear to be
numbers displayed around the PIN phones. There were no IPMs on site during the
visit however prisoners did comment that there were frequent visits and the IPMs
were visible within the establishment.

Page 203

64 
STANDARD 6 - PURPOSEFUL ACTIVITY 
All prisoners are encouraged to use their time in prison constructively. Positive
family and community relationships are maintained. Prisoners are consulted in
planning the activities offered. 
The prison assists prisoners to use their time purposefully and constructively
and provides a broad range of activities, opportunities and services based on
the profile of needs of the prisoner population.  Prisoners are supported to
maintain positive relationships with family and friends in the community.
Prisoners have the opportunity to participate in recreational, sporting,
religious and cultural activities.  Prisoners’ sentences are managed
appropriately to prepare them for returning to their community. 
Overall Rating:  Generally Acceptable 
In this standard, three quality indicators were rated as good performance, four were
rated as satisfactory performance and seven were rated as generally acceptable
performance, giving an overall rating of generally acceptable. There was one
example of good practice and eight recommendations for improvement. 
The prison offered an appropriate and sufficient range of high quality employment
opportunities to prisoners.  Prisoners engaged well in their work parties including the
enhanced work parties which supported a commercial contract. Some work parties
were cancelled frequently as staff were required for operational duties.  As a result of
COVID-19 restrictions there had been no new registrations for vocational
qualifications in the past year. 
All prisoners were made aware of the system for paid work as part of their induction
process. The Shotts Employability Board (SEB) met weekly to review applications
and allocated prisoners to work parties. All prisoners were happy with the system for
applying for and changing their work placements. The SEB did not keep eligible
applicants on a waiting list for future opportunities.  Prisoners were required to
reapply every Monday if they were still interested in a work party opportunity. 
The Learning Centre provided a welcoming, bright and comfortable environment for
prisoners to engage in learning.  Prisoners and staff worked well together and
prisoners valued their positive relationships with staff.  Learning and teaching was of
a high quality and purposeful.  Induction was not compulsory and with no follow up
was a missed opportunity to welcome prisoners to education and to highlight all that
the Learning Centre had to offer.  Staff did not always take prisoners previous
qualifications, knowledge and experiences or barriers to learning into account when
discussing their future learning. 
The prison offered a sufficient range of physical and health education opportunities,
and these were available to all prison populations. The Physical Training Instructors
(PTIs) were proactive in responding to the individual needs of prisoners who
accessed the gym. The range of provision was limited and did not engage all
prisoners.  Due to COVID-19 restrictions no prisoners had gained sports and fitness
accreditation.

Page 204

65 
All prisoners had access to a well-stocked library, which took account of cultural and
religious backgrounds. The librarian and passman were skilled, knowledgeable and
proactive in promoting the library.  Feedback on the library rules, stock, service and
environment were captured, displayed and responded to. Nominated by the
prisoners, the library assistant received recognition as the staff member of the year
in the Fife College 2022 awards. 
A number of prisoners participated in a range of self-help and peer support
opportunities.  Prisoners produced the STIR magazine, a high quality art publication
with contributions from all prisons.  Prisoners who participated in art classes
produced high quality work culminating in a number of successes at the Koestler
Awards. All prisoners had access to a range of events prior to the pandemic. Over
the past two years, these were limited but plans were in place to resume them in the
near future. 
HMP Shotts were offering prisoners the opportunity to attend fresh air for a minimum
of one hour per day, including those on isolation due to COVID-19 and the SRU.
Access to fresh air was on a rotational basis offering different times across the week.
Due to the poor turnout on the morning sessions a recommendation has been made
to encourage participation by providing afternoon sessions every day. 
Although pastoral care was not available daily, requests and referrals were being
dealt with in good time. 
The visitors centre had a welcoming feel to it, staffed by a FCO and Getting Better
Together Shotts (GBTS) with an information loop on the TV and literature available
for visitors. Interaction between staff and visitors was positive. During the visit
sessions staff were not intrusive, whilst adhering to their security responsibilities.
Access to normal visits consisted of five, 45 minute visits sessions available to book
monthly. Uptake for morning and afternoon sessions was low. The father and child
visits appeared particularly popular with a variety of toys and game activities
available. However there were some complaints that father and child visits could be
difficult to access. It was pleasing to report that HMP Shotts had recently increased
the session from 12 to 18 prisoners; however even with the increase in spaces the
evening sessions were fully booked. Accordingly although the overall number of visit
opportunities seemed to meet the needs of the population, some sessions were
poorly utilised and others over-subscribed. There were plans to introduce the video
visit facility into the residential areas which could improve uptake. Those on
restricted visits (closed) were managed appropriately with regular reviews in place. 
HMP Shotts provided a  range of therapeutic treatments and cognitive development,
as well as social and relational skills training activities, to all those at HMP Shotts as
well as accommodating those on the national waiting lists. However there was some
criticism voiced by prisoners that the lack of accessibility to courses prior to their
critical dates ‘window’ was delaying their opportunity to gain progression or parole at
the earliest time possible. During the inspection there were 100 ICM cases
outstanding. The ICM co-ordinators were prioritising those individuals who required a
pre-release or pre-parole case conference. The ICM co-ordinators were very
enthusiastic and knowledgeable and were motivated to increase their own

Page 205

66 
throughput and eradicate the backlog. It was reported that in some cases the ICM
coordinators would complete Personal officer paperwork to meet ICM deadlines.
Personal Officer lists were found in every residential area, which were linked to a
master list held on the HMP Shotts SharePoint site.  Some areas had the list posted
on the prisoners notice boards, but in other areas these were only on the
noticeboard in staff offices. HMP Shotts should ensure that Personal Officer lists are
clearly posted where all prisoners can see them. The process for managing those on
an Order for Lifelong Restrictions (OLR) and the Multi-Agency Public Protection
Arrangements (MAPPA) worked well with good communication between partner
agencies. 
In terms of the PANEL principles for this Standard: 
Participation: Prisoners were given the opportunity of work through a SEB on a one
to one basis. Although there were some good examples of prisoners receiving
individual support and mentoring to enable them to participate in work parties, there
was also evidence where previous qualifications, knowledge and experiences or
barriers to learning of prisoners were not taken into account. Prisoners who did not
attend induction missed the opportunity to understand what was on offer as there
was no follow-up communication later. Almost all prisoners who met with Inspectors
highlighted the positive impact on their mental health and wellbeing as a result of
participation in gym activities. 
Any prisoner who requires an annual case conference although not approaching
their critical dates is asked if they wished a case conference. If they do, then an ICM
is arranged. 
Accountability: The education department took into account the prison regime to
minimise timetable clashes. Staff monitored the Library footfall, using the focus
group findings to increase usage. Although HMP Shotts had a Family Strategy plan,
this was now requiring a review due to being more than five years old. Regular case
reviews of OLRs are carried by the Psychology department along with the personal
officer, ensuring any new information is captured and is recorded in the national data
base. Any new risks can then be identified to the Parole co-ordinator/Life Liaison
Officer and a case conferences for referral is made to the RMT or MAPPA. 
Non-discrimination and equality: Educational opportunities were provided for all
prisoner regardless of classification. There were some restrictions on protection
prisoners attending enhanced work parties. Cultural events were vastly reduced due
to COVID-19 but with the commencement of the Equality and Diversity Group in
March 2022, plans were in place to return to the pre-pandemic timetable. The new
Kiosk system was now in operation throughout the prison, with a range of languages
on it, however not all prisoners were aware of this function. 
Prisoners were able to access a range of worship opportunities for different faiths
including Muslim and Buddhist services however staff shortages did impact on these
services.  Only those visitors deemed as a risk were placed on closed visit, all other
visitors were allowed open visits with prisoners, allowing prisoners children to see
their father during child/father visits.

Page 206

67 
Empowerment: Generally, most prisoners understood their rights for employment
and the opportunities for education. Education focus groups allowed prisoners to
suggest changes to timetables and subjects on offer and also ran focus groups twice
yearly to understand the needs of their clients. Unfortunately, there was no evidence
that the same process was in place for physical activity.
Although there had been a Children’s Visits Activity Plan in place, this had now
ended. HMP Shotts recognises the value of involving prisoners and their families in
developing a new plan by arranging focus groups, however this had not yet taken
place. 
Legality: Although the prison rules (82) state that all prisoners should work, this is
not compulsory at HMP Shotts. During the Inspection, both residential halls offered
all prisoners at least 60 mins of time in the fresh air to all prisoners. All prisoners
managed under closed restrictions were done so in accordance with the Prison
Rules. 
Encouraging observations 
 Good examples of prisoners who were ‘not yet ready’ to participate in work
parties being identified and supported well by their Personal Officer to work
towards being able to participate.
 Almost all prisoners who met with Inspectors highlighted the positive impact
on their mental health and wellbeing as a result of participation in gym
activities 
Emerging concerns 
 The number of work parties cancelled as staff were required for alternative
prison duties
 Those not attending Education Induction should be followed up
 COVID--19 restrictions had prevented prisoners gaining sports and fitness
accreditation.
 Registration for vocational qualifications had stalled
 There were no processes in place to consult with prisoners to take account of
individual interests and needs to inform future programmes. For example, for
those older adults and those with additional needs.
 The high number of outstanding ICM case conferences
 Prisoner perceptions of delays in progression or parole caused by limited
access to offending behaviours programmes

Page 207

68 
Quality Indicators 
6.1 There is an appropriate and sufficient range of good quality employment
and training opportunities available to prisoners. Prisoners are consulted in
the planning of activities offered and their engagement is encouraged. 
Rating:  Generally Acceptable 
The prison offered an appropriate and sufficient range of high quality employment
opportunities to prisoners.  These included work parties for gardens, laundry,
catering, wood assembly, wood machine, engineers, bike shed, occupational,
textiles, recycling and charity.  The prison also provided employment for pass men in
the residential halls, the education centre and gymnasium. 
Prisoners engaged well in their work parties including the enhanced work parties that
supported a commercial contract.  The prison had previously offered an extensive
range of vocational training opportunities prior to COVID-19 restrictions. 
All prisoners were made aware of the available work parties at induction and all
eligible prisoners were encouraged to attend a work party although employment is
not compulsory.  All eligible prisoners were given the opportunity to discuss their
employment opportunities on a one to one basis by attending the SEB who met
weekly to review and allocate available positions in work parties. 
There were good examples of prisoners receiving individual support and mentoring
to enable them to participate in work parties. 
The scheduling of employment and training opportunities had not been reviewed
since the start of COVID-19 restrictions. The SEB took no account of prisoner’s
suggestions for future work parties. 
The prison regime had changed as a result of dealing with high levels of staff
absenteeism. Some work parties were cancelled frequently as staff were required
for prison security duties. 
As a result of COVID-19 restrictions there had been no new registrations for
vocational qualifications in the past year. 
Recommendation 28: Registration for vocational qualifications should
recommence 
6.2 Prisoners participate in the system by which paid work is applied for
and allocated. The system reflects the individual needs of the prisoner and
matches the systems used in the employment market, where possible. 
Rating:  Generally Acceptable 
All prisoners were made aware of the system for paid work as part of their induction
process. The Shotts Prisoner Employment Policy supported the system for the
allocation of paid work.  The SEB met weekly to review applications and allocate

Page 208

69 
prisoners to work parties.  Almost all prisoners understood the rationale of selection
for paid work, although some categories of prisoners were not eligible to apply for
enhanced work parties. 
All eligible prisoners were able to apply for employment, or request a change of
employment through the SEB.  Prisoners were able to attend the SEB to discuss
their application and to receive feedback.  All prisoners were happy with the system
for applying for and changing their work placements. 
There were good examples of prisoners who were ‘not yet ready’ to participate in
work parties being identified and supported well by their Personal Officer to work
towards being able to participate. 
Information regarding the availability of work parties was advertised in the
accommodation halls, although the prison did not systematically advertise vacancies
in work parties and relied on word-of-mouth. 
When a prisoner’s application for a work party was unsuccessful, the SEB did not
keep eligible applicants on a waiting list for future opportunities.  Prisoners were
required to reapply every Monday if they were still interested in a work party
opportunity. 
6.3 There is an appropriate and sufficient range of good quality educational
activities available to the prisoners. Prisoners are consulted in the planning of
activities offered and their engagement is encouraged. 
Rating:  Generally Acceptable 
The Learning Centre provided a welcoming, bright and comfortable environment for
prisoners to engage in learning.  The centre was fit for purpose and well equipped
with a range of resources including the library.  Prisoners and staff worked well
together and prisoners valued their positive relationships with staff.  Learning and
teaching was of a high quality and purposeful.  Staff adapted their learning and
teaching approaches effectively to meet the needs of learners who were motivated
and engaged in learning.  A few prisoners were making good use of resources to
support self-directed study. 
Prisoners participated in a wide range of subjects and qualifications at Scottish
Credit and Qualifications Framework levels 3-6 across 12 subject areas including
Communications, ICT, and Numeracy.  There were a total of 13 prisoners
participating in Open University courses with five continuing and eight who had
recently applied. 
The Learning Centre Manager (LCM) held focus groups with prisoners to gather
suggestions about changes to timetables and subjects on offer. 
Education opportunities were promoted within the halls and on the PIC. The LCM
liaised informally with other areas within the prison and took account of their
timetables when scheduling classes in order to minimise timetable clashes.  The
prison encouraged prisoners to participate in education and they received the

Page 209

70 
appropriate wage from their work party whilst they attended the learning centre.
Educational opportunities were provided for all categories of prisoner with timetabled
provision for prisoners on protection regimes. 
All prisoners were informed that they had been scheduled for an induction session to
education shortly after they arrived in the prison.  If they didn’t attend at this time,
there was no follow-up communication.  This was a missed opportunity to welcome
prisoners to education and to highlight all that the Learning Centre had to offer. 
During induction, Learning Centre staff made prisoners aware of the range of
educational opportunities available within the prison.  This provided an opportunity
for staff to identify and support any prisoner requiring additional learning support.
However, staff did not always take prisoners previous qualifications, knowledge and
experiences or barriers to learning into account when discussing their future
learning. 
6.4 There is an appropriate and sufficient range of physical and health
educational activities available to the prisoners and they are afforded access
to participate in sporting or fitness activities relevant to a wide range of
interests, needs and abilities. Prisoners are consulted in the planning of
activities offered and their engagement is encouraged. 
Rating:  Generally Acceptable 
The prison offered a sufficient range of physical and health educational opportunities
and these were available to all prison populations. A change in regime due to the
impact of COVID-19 has resulted in each residential level having individual access to
the gym on a daily basis. As a result, attendance has increased to approximately 100
prisoners per day.  The available space was used well to facilitate the increased
numbers. For example, cardio equipment was in one area and weights were in the
main hall area. 
The PTIs were proactive in responding to the individual needs of the prisoners who
accessed the gym. This included an assessment using the physical activity
readiness questionnaire and induction with a PTI before accessing physical activity.
Personal training plans and health and nutrition advice and information was also
provided on request. 
Relationships between the PTIs and prisoners were strong and their experience and
support was valued.  Almost all prisoners who met with Inspectors highlighted the
positive impact on their mental health and wellbeing as a result of participation in
gym activities.  Prior to the pandemic, in partnership with Fife College, a few
prisoners achieved accreditation in recognition of their achievements. 
The satellite gyms, which mainly consisted of cardio equipment in each of the
residential halls were well used.  In the NIC, weights equipment was also available,
used well and prisoners were supported by a prison officer. There were a few
examples where PTIs have provided individual programmes for use in these areas
and promotional materials for the gym were on display in all residential halls.

Page 210

71 
The range of provision was limited and did not engage all prisoners.  Due to
COVID--19 restrictions no prisoners had gained sports and fitness accreditation. 
There were no processes in place to consult with prisoners to take account of
individual interests and needs to inform future programmes.  For example, for those
older adults and those with additional needs. 
Recommendation 29: Sports and fitness accreditation should be
recommenced. 
6.5 Prisoners are afforded access to a library which is well-stocked with
materials that take account of the cultural and religious backgrounds of the
prisoner population. 
Rating:  Good 
All prisoners had access to a well-stocked library, which took account of cultural and
religious backgrounds. This included books, audio material, DVDs and electronic
games. An easy read section was also in place to support those with lower level
reading ability.  Coloured overlays were also available to support those with dyslexia.
A smaller library resource was also located in the SRU.  Regular donations from
prisoners, the public and West Lothian Council library service also helped to expand
the library content. The use of the Dewey decimal classification system to arrange
books via subject aligned well with the library systems used in communities. 
Library resources were accessed by attending the library or through the well-
established request service.  The librarian and passman were skilled, knowledgeable
and proactive in promoting the library.  They supported prisoners to make best use 
of the resources and developed new initiatives to respond to identified needs.  This
included the partnership with NHS to develop a self-help service in response to a
growing need for support with mental health.  Self-help resources were displayed
well and were widely accessible, including a confidential request service where
information was delivered to residential areas.  Requests for resources had
increased and feedback was positive, including informal feedback across the wider
prison population. The library assistant had completed first aid in mental health
training, which had strengthened her knowledge in this area. 
The library assistant regularly visited halls to distribute information leaflets and
promote the library.  In cell reading materials were shared and goal setting and
achievements were discussed regularly with prisoners.  The library assistant, with
good support from the passman developed and delivered a number of other
programmes or activities.  For example, monthly book groups and a regular podcast
took place with all content identified by the prisoners. This included, music, book
reviews, information sharing and inputs from partners.  Partners, such as
psychological services welcomed the opportunity to share information and demystify
their profession. The Friday morning ‘Minds Matters’ sessions facilitated access to
advice and information in response to an increase in mental health issues.  Topics
included mental health, suicide prevention, addiction, trauma, meditation and regular
visits from a therapet, which was very popular.

Page 211

72 
Library staff recorded footfall in the library on an ongoing basis and consulted with
prisoners twice yearly.  This showed that footfall was increasing.  Feedback on the
library rules, stock, service and environment were captured, displayed and
responded to. Nominated by the prisoners, the library assistant received recognition
as the staff member of the year in the Fife College 2022 awards. 
6.6 Prisoners have access to a variety of cultural, recreational, self-help or
peer support activities that are relevant to a wide range of interests and
abilities. Prisoners are consulted on the range of activities and their
participation is encouraged. 
Rating:  Generally Acceptable 
All prisoners had access to a range of events prior to the pandemic. Over the past
two years these have been limited but plans were in place to resume these in the
near future.  The Equality and Diversity Group held its first meeting in March 2022
and there were plans to build on the work of this group to design a varied
programme of events for all prisoners. 
The Kiosk system that operates throughout the prison was available in a range of
languages, however, not all prisoners were aware of this function. 
Prisoners who participated in art classes produced high quality work culminating in a
number of successes at the Koestler Awards.  Sixty-four pieces of art work were
entered in 2022 with a further 15 entries in relation to graphic design, poetry and
creative writing.  In previous years, a few prisoners successfully gained gold and
platinum Koestler Awards. 
Prisoners produced the STIR magazine, a high quality publication with contributions
from all prisons. The content, with its focus on creativity and self-expression such as
body art, was relevant to the prison population.  The Editorial Group, consisted of
four long-term prisoners who oversaw the production of the magazine.  Supported by
Fife College and distributed to 13 prisons across Scotland this provided an
opportunity for prisoners to achieve individual goals.  Similarly, the Snapshot monthly
magazine written and designed by HMP Shotts prisoners was of good quality with
content relevant to their context. 
A number of prisoners participated in a range of self-help and peer support
opportunities, including a listener service, although these were limited.  A systematic
and planned approach to encourage participation would have benefitted the prison
population. 
6.7 All prisoners have the opportunity to take exercise for at least one hour
in the open air every day.  All reasonable steps are taken to ensure provision
is made during inclement weather. 
Rating:  Satisfactory 
During the Inspection, both residential halls were found to be operating time in the
fresh air to all prisoners for a minimum of one hour per day.  The four periods were

Page 212

73 
for set times, but this was on a rotational basis ensuring each area had access at
different times across the week. The timetable for accessing time in the fresh air
was found on all hall notice boards. 
In every area a provision of outdoor weatherproof clothing was present, which
appeared to be sufficient to accommodate everyone wishing to use it. The two
periods in the morning were poorly attended from both of the residential halls.
Attendance at afternoon sessions appeared much more popular with the prisoner
groups.  Staff advised that prior to COVID-19 only two sessions operated which
meant grouping areas appropriately; such as Allenton levels 1 and 2 which both
house protection prisoners. 
During the observation of an afternoon session a number of prisoners requested
access back into the hall prior to the hour ending (referred to as ‘half-time’) which
staff accommodated, the remaining prisoners enjoyed their full hour.  This appeared
to be a common practice, and the flexibility of staff to facilitate this ensured that
prisoner’s needs or preferences were accommodated. 
One area reported having two individuals who were isolating due to COVID-19, both
of whom were consistently offered their hour in the fresh air separate from other
prisoners. 
The SRU was also found to consistently offering a daily hour in the fresh air to all
prisoners. 
During the inspection period, all prisoners located in one specific area were
restricted from having their opportunity of an hour in the fresh air due to on-going
security concerns.  These restrictions were applied appropriately and in full
compliance with the Prison Rules. 
Recommendation 30: HMP Shotts should review the exercise timetable to
appropriately group areas and consider scope to provide afternoon access to
all prisoners every day. 
6.8 Prisoners are assisted in their religious observances. 
Rating:  Satisfactory 
The timetable for the various religious services was published and on display in all
residential areas. 
The faith centre was bright and welcoming, with good décor and suitable to arrange
for a wide variety of services or requirements. 
The pastoral team were awaiting the arrival of a new member of staff, due around
the end of May.  Currently, not all days had a member of the team on duty, but all
requests and referrals were being dealt with in good time.  There had also been
some issues with the attendance of an Imam, but this had been resolved.

Page 213

74 
Unfortunately, with reduced staffing the ability to deliver additional faith studies had
been impacted. Previously up to four varying study groups were facilitated annually.
It was hoped that after May, staffing would allow for the recommencement of a range
of faith studies. 
The care of the pastoral team was evident through their willingness to provide, what
they describe as ‘softer’ services, not directly linked to or based on one’s faith.  Their
willingness not just to attend to the ‘needs’ relating to faith but, trying to ensure any
‘needs’ of any prisoner were addressed is to be commended. 
6.9 The prison maximises the opportunities for prisoners to meet and
interact with their families and friends.  Additionally, opportunities for
prisoners to interact with family members in a variety of parental and other
roles are provided. The prison facilitates a free flow of communication
between prisoners and their families to sustain ties. 
Rating:  Generally acceptable 
The Visits Centre was a welcoming venue, staffed by an FCO and Getting Better
Together Shotts (GBTS). There was an information loop on screen and literature to
assist families through their interaction with the prison and wider support groups. 
HMP Shotts provided a Family Strategy, however the five-year plan had expired in
March of this year. The plan appeared to have been last updated in October 2019,
and although a number of actions were completed there remained some which were
on-going.  Indeed, the plan appears not to have been reviewed and updated during
the COVID-19 pandemic which was surprising. 
The FCO provided the Children’s Visits Activity Plan which showed activities across
approximately 10 weeks for health, fitness, learning or general fun for children and
families. This plan had ended with no replacement but inspectors were advised that
families and prisoners were being consulted for the creation of a new Activity Plan.
This was confirmed by managers who stated that user voices were important and
that a survey was imminent for prisoner and families to shape services in the visits. 
The father and child visits appeared very popular with both prisoners and families.
Staff positioned themselves well to maintain appropriate observations, but did so in a
manner which was not intrusive nor impacted on the fun that the children present
appeared to be having.  A wide variety of toys and game activities were brought into
the visit room which appeared to generate greater interactions between the fathers
and their children. A stark contrast to the normal family visits where paper and
colouring pencils were the only activity offered. 
Due to the pandemic, capacity of the visits required a reconfiguration of the layout,
and part of this included the removal of the soft play area facilities (at the time of the
inspection this area was still being used to store excess tables and chairs).
Refreshment for all visits could be purchased from a number of vending machines
which appeared well stocked.  There previously was a tea-bar facility but this closed
prior to the pandemic and had not yet been reopened.

Page 214

75 
Prisoners were entitled to book five 45-minute visits sessions per month, inclusive of
one evening and one weekend session per week.  However, several prisoners
commented that it could be difficult to access the Father and Child visits.  Indeed,
normal family visits in the evening or over the weekend appeared to be prime time
with session often fully booked, and some prisoners reported that if these sessions
were full then they would be without a visit that week.  Conversely, morning and
afternoon sessions appeared to be very poorly attended with numbers extremely
low.  In one instance HMIPS found a session where only three visits were booked
and no visitors actually attended.  During the inspection restrictions on capacity were
lessened, increasing the session from 12 to 18 prisoners but even with additional
places the evening sessions were fully booked. 
Recommendation 31: HMP Shotts should prioritise creating a new Family
Strategy to plan improvements going forward and complete consultations with
families around development of a new Children’s Visits Activity Plan. HMP
Shotts should re-instate the soft play area as soon as possible and review what
activities can be provided for children during normal family visits. 
Recommendations 32:  HMP Shotts should review availability of visit sessions
and maximise places in evening and weekends which best suit prisoners and
families. 
6.10 Arrangements for admitting family members and friends into the prison
are welcoming and offer appropriate support.  The atmosphere in the Visit
Room is friendly, and while effective measures are adopted to maintain
security, supervision is unobtrusive. 
Rating:  Satisfactory practice 
A number of observations of admitting visitors to the prison and visits sessions were
carried out.  At all times, staff were found to be professional, they were courteous to
visitors on arrival and helpful during visits sessions.  Staff were observed dealing
with a visitor who had mobility restrictions and their actions ensured that during
necessary security checks no discomfort was placed on the individual.  Visitors for
one prisoner arrived when a visit had not been booked.  Staff reviewed this
appropriately and accommodated the visit, which was appreciated by the visitors. 
During visits sessions staff were observed to position themselves appropriately to
maintain good overall security supervision, but not in a manner which would appear
intrusive to either prisoners or visitors.  Throughout all observations, the atmosphere
in the visits room was relaxed and calm with all attendees appearing to interact freely
without feeling scrutinised. 
GBTS staff the Visits Centre, however current provision only extends to week days
and Saturday mornings.  Inspectors were advised that GBTS were seeking to
increase funding and provide staff across all visits sessions, and HMP Shotts should
support them with this.  The Centre was welcoming and well provisioned to support
visitors, especially those with younger children. Whilst the GBTS staff were present
there was a wide variety of activities for children as well as refreshments and
information for families.

Page 215

76 
6.11 Where it is not possible for families to use the normal arrangements for
visits, the prison is proactive in taking alternative steps to assist prisoners in
sustaining family relationships. 
Rating:  Good 
Within the main visits area, HMP Shotts had five video conference units which could
be booked through the normal visits process by submitting a visits request.
Inspectors were advised that planning was underway to move this facility into the
residential halls. This would potentially increase the capacity for the visits room for
those seeking in person family contact, as well as, give potentially greater
accessibility and flexibility to those wishing to undertake video visits. 
A video conference unit was also available within the SRU.  Logistically, this
benefited the whole establishment without creating the necessity to alter the regime
when prisoners held within the SRU booked a video visit.  This also ensured minimal
disruption to regular family visits where additional staff would have been deployed
within the visit room specifically for security of the individual from the SRU. This was
considered good practice. 
The video visits that were observed appeared to run without issue but again were
poorly utilised, with often only one or two prisoners and there was capacity for five.
One potential issue was that although the prisoner had headphones, some appeared
distracted by what was happening around them in the visits room.  This possible
distraction could be compared to having a call in a busy workplace or crowded room.
Quieter surroundings may improve uptake and enjoyment of this facility. 
The prisoner induction included an offer of a family/friends induction on the facilities,
support and range of opportunities available in the prison, in order that families can
better understand what life in the prison is actually like. 
Good Practice 9: Video visits for prisoners in the SRU were facilitated within
the SRU, which prevented any potential disruption to the main visit area. 
6.12 Any restrictions placed on the conditions under which prisoners may
meet with their families or friends take account of the importance placed on
the maintenance of good family and social relationships throughout their
sentence. 
Rating:  Good 
During the inspection, only four prisoners were listed as being under restrictions for
family visits and all were reviewed at minimum monthly by committee.  All prisoners
who were currently being managed under closed restrictions were done so in
accordance with the Prison Rules.  A review of these individuals and discussions
with staff evidenced that each case was assessed on its own merits and decisions
were tailored to the individual and the circumstances. 
One such individual, previously on the closed list, was reviewed and the restrictions
were removed. They are now able to enjoy open visits with the majority of their

Page 216

77 
family and friends.  However, one of their visitors remained a risk and was therefore
banned from entering the establishment.  The prisoner was offered virtual visits with
this individual. This was good use of the virtual facilities to maintain the family
contact. 
6.13 There is an appropriate and sufficient range of therapeutic treatment
and cognitive development opportunities as well as an appropriate and
sufficient range of social and relational skills training activities available to
prisoners. 
Rating:  Satisfactory 
HMP Shotts provided an appropriate range of therapeutic treatments and cognitive
development, as well as social and relational skills training activities. A number of
prisoners had transferred into HMP Shotts specifically to complete a course when
the national waiting list triggered their attendance.  Access to all courses was
available to both mainstream prisoners and those in the protection regime. 
The Programmes Team delivered Constructs, Self-change Programme, Discovery
and Pathways. 
As with all Prisons in Scotland, HMP Shotts adhered to the national waiting lists for
prisoner attendance on the course identified for their specific needs.  HMP Shotts
was one of the few prisons offering some of these courses, which created logistical
challenges but also other concerns.  The lists provided showed that some prisoners
may have to wait a considerable time in order to access and benefit from this
opportunity. 
A number of prisoners voiced their concerns with regards to accessing programmes.
It was felt by both indeterminate and determinate sentenced prisoners that the
inability to access courses prior to their critical dates ‘window’ was delaying their
opportunity to gain progression or parole at the earliest time possible.  A number
stated that this was the “SPS’ fault” and not theirs. 
Additionally, there was a concern regarding the approach to implementing the
national waiting list which appeared to take no cognisance of the individual out with
calculated critical dates.  As such, prisoners who had served extremely long periods
within HMP Shotts were informed that the next available space on a course meant
they required to transfer to another establishment.  Some prisoner had built
friendships and a peer group who supported them, it may also place further hardship
on their family if they decide to transfer for a course.  The same could be the position
for those prisoners who require to transfer to HMP Shotts for a programme. This is
not a person-centred approach. 
Recommendation 33: SPS HQ should review the policy for implementing a
national waiting list for access to programmes and its capacity for delivering
programmes against demand to ensure there is no detrimental effect on the
care of individuals in custody or their ability to progress.

Page 217

78 
6.14 The prison operates an individualised approach to effective prisoner
case management, which takes account of critical dates for progression and
release on parole or licence. Prisoners participate in decision making and
procedures provide for family involvement where appropriate. 
Rating:  Generally acceptable 
At the time of the inspection, it was found that approximately 100 ICM case
conferences were outstanding. 
Currently, the ICM co-ordinators were prioritising those individuals who required a
pre-release or pre-parole case conference. Those individuals who required an
annual case conference, where they were not approaching any critical dates, were
written to asking if they wished a case conference at this time. Where the individual
requested it the ICM co-ordinators would always oblige. 
Where appropriate the ICM co-ordinator would seek family involvement. However,
although most pandemic restrictions had been removed, approximately only one in
four family members who were invited to attend actually did so. 
The ICM co-ordinators were very enthusiastic and knowledgeable.  There was a
keen motivation to increase their own throughput and eradicate the backlog.  In
some instances, for those approaching critical dates, the ICM co-ordinators would
complete missed Personal Officer interviews to ensure that the case conference
could proceed without further delay. 
Personal Officer lists were found in every residential area, which were linked to a
master list held on the HMP Shotts SharePoint site. All prisoners were listed with a
named officer identified.  Some areas had the list posted on the prisoners notice
boards, but in other areas these were only on the noticeboard in staff offices. HMP
Shotts should ensure that Personal Officer lists are clearly posted where all
prisoners can see them. 
Recommendation 34: HMP Shotts should ensure that, whenever possible, it
is always the Personal Officer that completes the required interview and
documentation for the ICM process. 
Recommendation 35: HMP Shotts should continue to support ICM staff to
address the backlog and bring all case conferences up to date. 
6.15 Systems and procedures used to identify prisoners for release or
periods of leave are implemented fairly and effectively, observing the
implementation of risk management measures such as Orders for Lifelong
Restriction (OLR) and Multi-Agency Public Protection Arrangements (MAPPA). 
Rating:  Good 
The connectivity between internal departments evidenced a good level of
communication relating to those prisoners identified for progression or potential
release. The ICM co-ordinators knowledge and experience had promoted effective

Page 218

79 
relationships and information sharing with all partners, whether managing individuals
through MAPPA or those on an Order for Lifelong Restrictions (OLR). 
All OLR prisoners were managed nationally by the Head of Psychology, with regular
case reviews led by the Psychologist within HMP Shotts. This included meeting with
the Personal Officer to discuss the individual and any potential new information and
the national database recorded monthly meetings. 
The ICM co-ordinators liaised with the Parole co-ordinator/Life Liaison Officer where
potential risks were identified through case conferences for referral to RMT or
MAPPA.

Page 219

80 
STANDARD 7 - TRANSITIONS FROM CUSTODY TO LIFE IN THE COMMUNITY 
Prisoners are prepared for their successful return to the community. 
The prison is active in supporting prisoners for returning successfully to their
community at the conclusion of their sentence. The prison works with
agencies in the community to ensure that resettlement plans are prepared,
including specific plans for employment, training, education, healthcare,
housing and financial management. 
Inspection Findings 
Overall rating:  Generally Acceptable Performance 
In this standard, two quality indicators were rated as satisfactory and three were
rated as generally acceptable, giving an overall rating of generally acceptable.
There were two examples of good practice and five recommendations for
improvement. 
Relevant Information for this standard 
HMP Shotts is the only establishment in Scotland that is categorised as a long-term
prison however during the inspection there were 15 prisoners serving under four
years, including recalls. The following findings therefore need to be read in the
context of the following information: 
 Most prisoners are not liberated from HMP Shotts, but progress to other
prisons to prepare for release.
 HMP Shotts does not have the same role as other establishments in terms of
preparing prisoners for their successful return to the community.
 The prison liberates between 60 and 100 prisoners each year, with almost all
released on non-parole licence, and not subject to statutory supervision by
community-based social work services.  The prison has a key role in supporting and approving progression of
prisoners to National Top End (NTE) establishments and the open estate.
Therefore, the prison has a responsibility for preparing individuals
appropriately for these important transitions. 
In terms of the PANEL principles: 
Participation: Prisoners in HMP Shotts had good opportunities to get involved
in key planning processes.  ICM meetings were appropriately focussed on the
individual prisoner. The prisoners were encouraged to share their views about
the support they may require and access to services for helping them prepare
for release or progression to less secure conditions. Prisoners were
encouraged to become fully involved in the completion of reports by prison staff
and prison based social workers.  Families were provided with relevant
information on the key planning processes and were encouraged to take part in
ICM meetings where appropriate, although the numbers attending were low.

Page 220

81 
Accountability: The delivery of accredited programmes at HMP Shotts
reflected the needs of the population.  There were clear attempts to be flexible
to meet individual needs and examples of innovation to further develop these
programmes. There was an outstanding need to review the broader delivery
of interventions with a particular focus on meeting the support needs of a
prison population affected by addictions, trauma and loss.  The pre-release
ICM meeting was key to identifying any concerns about plans for transition.
These meetings ensured that all relevant support services were aware of the
individual’s circumstances and the supports needed. 
Non-discrimination and equality: The importance of initial case conferences
as part of the ICM processes was understood by key staff and every effort
was made to ensure that these meetings had all the information they needed
for identifying any vulnerabilities.  Accessibility issues were discussed within
the Programme Case Management Board (PCMB) and solutions developed to
ensure that barriers to attending programmes delivered in the establishment
were removed. 
Empowerment: Prisoners were placed at the centre of the ICM meetings.
Preparatory discussions sought to ensure they understood the process of
these meetings and were enabled to contribute.  The format of these
meetings ensured that prisoners had an opportunity to comment or ask
questions regarding sentence plans.  Care was taken to ensure that prisoners
understood what was being said as well as any decision and outcomes from
the meeting. 
There was a mixed understanding among prisoners about the range of
services available to them. There were also examples of variability in the
quality of communication with prisoners about decision making related to their
progression.  As a result, some prisoners felt ill informed about plans for
progression and eventual release.  There was some uncertainty about what
may be in place for them in terms of future community supports. 
Legality: There was an appropriate emphasis on meeting legal obligations
and the role of community-based services in meeting the needs of individuals
making the transition from custody to life in the community.
Community-based social work services played a key role in ensuring that
services in the community were in place to enhance the likelihood of a
successful future integration.  Despite this, some prisoners were unclear
about plans for release and were not confident that they would have access to
the support they needed, including access to appropriate housing. 
Encouraging observations 
 The co-location of interventions, psychology and prison based social work
(PBSW) teams enabled opportunities for case discussion and reflection. In turn
this promoted understanding of each other’s role.
 HMP Shotts prioritised the resumption of programme delivery following the
lockdown. As a result, the programme delivery team was able to progress
innovations to improve the content of existing programmes.

Page 221

82 
Emerging concerns 
 HMP Shotts should explore potential partnerships to offer independent advice in
relation to the issues likely to concern all prisoners due for release from
HMP Shotts, e.g. financial, housing, employment. This will help to ensure that
prisoners have the access they need to advice relevant for making successful
plans for release.
 HMP Shotts should improve consistency in the role played by personal officers
(POs) in supporting individuals, including attendance at pre-release ICM
meetings and ongoing time with prisoners prior to release.  This will promote the
confidence of prisoners in the plans for their release.
 HMP Shotts should explore opportunities to gather evidence on the progress and
outcomes for individuals liberated from the prison to inform service delivery and
support continuous improvement.  This will help to ensure that prisoners benefit
from evidence-based approaches to the successful return of individuals from
custody to the community.
 To help to prepare prisoners for the significant transition from custody, HMP
Shotts should promote the delivery of a formal ‘life skills’ learning opportunity.

Page 222

83 
Quality Indicators 
7.1 Government agencies, private and third sector services are facilitated to
work together to prepare a jointly agreed release plan and ensure continuity of
support to meet the community integration needs of each prisoner. 
Rating: Generally acceptable 
Collaboration between agencies based within the prison was effective.  Appropriate
efforts were made to identify services to support individual prisoners’ sentence plans
and eventual community integration needs.  The pre-release ICM meeting was a key
step in the process. Efficient preparations ensured the right people were involved in
ICM meetings, including family and community-based services.  The meetings were
focussed on the individual and their plan for progression and eventual release.  This
included identifying support needs and how they were to be met. 
The Link Centre had a limited resource.  Efforts concentrated on addressing
potential logistical barriers to progression and eventual reintegration, including
access to a bank account and accepted identification documents.  This was
undoubtedly a valuable service.  There were few external or community-based
agencies with a regular presence in the prison. There was an emphasis on, and
expectation of, community-based social workers (CBSW) to engage and involve
services in planning for release.  Access to independent general advice such as on
benefits, financial matters or housing was not available to prisoners. 
Recommendation 36:  HMP Shotts should explore potential partnerships to
offer independent advice in relation to the issues likely to concern all prisoners
due for release. This will help to ensure that prisoners have the access they
need to advice relevant for making successful plans for release. 
7.2 Where there is a statutory duty on any agency to supervise a prisoner
after release, all reasonable steps are taken to ensure this happens in
accordance with relevant legislation and guidance. 
Rating:  Satisfactory 
The ICM process was well established and there was a consistent approach to the
efficient coordination of these meetings.  There was consistent attendance from
PBSW and CBSW who were both involved in the preparation of assessments to
inform sentence planning and the formulation of pre-release plans. 
Knowledge of the ICM process among prisoners and staff was satisfactory.  The
involvement of POs in meetings and the overall quality of reports was mixed.  POs
reported that it would be beneficial for ICMs to be arranged when they were on shift.
New residential officers (direct entrants) made comment that there should be more
emphasis placed on PO work while they were at the SPS college for initial training,
and they felt unprepared when returning to their establishment.

Page 223

84 
Collaboration between PBSW and CBSW from various parts of the country was
challenging.  However, the experienced PBSW Team worked hard to ensure that
communication was effective. 
PBSW staff consistently fulfilled their responsibilities in the preparation of
assessments and reports to assist decision making.  The social work contribution
was valued. Social workers were core members of the RMT, and alongside
colleagues from psychology provided relevant expertise and knowledge to support
and inform defensible decision making in relation to sentence progression and
access to the open estate. Assessments and reports prepared by PBSW and
psychologists benefitted from the relationships staff had developed with long term
prisoners. As a result, assessments and reports reflected cooperative
inter-disciplinary working and were informed by the views and experiences of
prisoners. 
Good practice 10: The co-location of Interventions, Psychology and PBSW
teams enabled opportunities for case discussion and reflection which in turn
ensured that there was a good understanding of each other’s roles. 
Recommendation 37: SPS HQ should consider whether there should be more
emphasis placed on Personal Officer work during officers initial training at the
SPS college. 
7.3 Where prisoners have been engaged in development or treatment
programmes during their sentence, the prison takes appropriate action to
enable them to continue or reinforce the programme on their return to the
community. 
Rating:  Satisfactory 
General Programme Assessments (GPAs) continued to be undertaken by
psychology staff throughout the pandemic to determine access to the most
appropriate programmes. Where specialised assessments were identified as
appropriate, for example domestic abuse convictions, these were completed. There
was recognition by the programmes team and prison-based social work of limited
capacity to complete level of service/case management inventory (LS/CMI)
assessments to inform the PCMB. 
Staff were ambitious for the further development of a broader range of interventions.
Building on what existed to address addictions and increasing the availability and
accessibility of counselling for loss and experience of trauma.  The programme
delivery team were also piloting a programme which included a focus on addressing
domestic abuse. These were encouraging developments. 
Prisoners were not confident about the continuity of access to programmes when
returning to the community.  Prisoners were frustrated by the waiting list to access
national programmes and the detrimental impact this lack of access had on
progression. The programmes team were proactively seeking solutions to this issue.

Page 224

85 
Good Practice 11:  HMP Shotts prioritised the resumption of programme
delivery following the lockdown and the programme delivery team was
innovating to improve the content of existing programmes. 
7.4 All prisoners have the opportunity to contribute to a co-ordinated plan
which prepares them for release and addresses their specific community
integration needs and requirements. 
Rating: Generally acceptable 
The ICM system was well established with a clear focus on identifying and meeting
the needs of individual prisoners.  Staff responsible for the operation of ICMs made
effective arrangements to promote the involvement of all prisoners and, where
appropriate, family members, although the attendance by family members was low.
The central focus of the ICM on the prisoner, meant they were encouraged and
supported to voice their views. 
While there is an expectation that prisoners are supported by POs, this was not
always happening. There were challenges due to rostering and in the timely
completion of reports and updates to Community integration plans (CIPs). The
regime, whereby most prisoners were locked up after tea time, did allow for PO work
to be carried out but a lack of training is a concern.  New POs rely on more
experienced POs to learn from which is not always the most effective way of
learning. 
Information sharing between PBSW and CBSW was effective in co-ordinating plans
for release.  Given the prison accommodated prisoners from all over the country,
there was an emphasis on the role of CBSW in identifying and arranging appropriate
community supports and involving them in planning where relevant. 
There was a concerted effort to provide access to drug and alcohol interventions
within the prison.  Appropriate oversight was provided by a group of multi-agency
statutory partners. 
Some prisoners due for release from the prison lacked confidence about important
parts of their integration plans, especially housing options and access to mental
health support. None had been given any formal opportunity to develop key life skills
as part of preparation for release during their sentence. 
Recommendation 38:  HMP Shotts should improve consistency in the role
played by POs supporting individuals, including attendance at pre-release ICM
meetings and ongoing time with prisoners prior to release.  This will promote
the confidence of prisoners in the plans for their release. 
Recommendation 39:  HMP Shotts should explore the delivery of a formal ‘life
skills’ learning opportunity to help to prepare prisoners for the significant
transition from custody to the community.

Page 225

86 
7.5 Where the prison offers any services to prisoners after their release,
those services are well planned and effectively supervised. 
Rating: Generally acceptable 
The prison did not offer any services to prisoners after their release. 
No information was being gathered on progress and outcomes after release to
inform any future developments. 
Prior to release efforts were made to help prisoners engage with services to support
transition to the community on release.  This was usually coordinated by CBSW and
link centre staff based on needs identified in the pre-release ICM meeting.  Other
external agencies attended these meetings where relevant, including representatives
from housing or accommodation providers. 
Link centre staff responded directly to the needs of prisoners on an individual basis,
including in relation to finances and welfare rights issues.  There were limited
examples of external agencies looking to establish a routine presence in the prison
to build relationships with prisoners to support the transition from custody to the
community. 
Recommendation 40: HMP Shotts should explore opportunities to gather
evidence on the progress and outcomes for individuals liberated from the prison
to inform service delivery and support continuous improvement.  This will help
to ensure that prisoners benefit from evidence-based approaches to the
successful return of individuals from custody to the community.

Page 226

87 
STANDARD 8 - ORGANISATIONAL EFFECTIVENESS 
The prison’s priorities are consistent with the achievement of these Standards and
are clearly communicated to all staff. There is a shared commitment by all people
working in the prison to co-operate constructively to deliver these priorities. 
Staff understand how their work contributes directly to the achievement of the
prison’s priorities. The prison management team shows leadership in
deploying its resources effectively to achieve improved performance. It
ensures that staff have the skills necessary to perform their roles well.  All
staff work well with others in the prison and with agencies which provide
services to prisoners.  The prison works collaboratively and professionally
with other prisons and other criminal justice organisations. 
Inspection Findings 
Overall Rating:  Generally acceptable Performance 
In this standard, four quality indicators were rated as satisfactory performance, three
were rated as generally acceptable performance, and one was rated as poor
performance giving an overall rating of generally acceptable. There were
three recommendations for improvement. 
With only one exception, performance against the quality indicators in this standard
was either fully satisfactory or generally acceptable with sufficient evidence of
competence against some elements of the quality indicator to not cause concern.
For example, there was clear evidence of appropriate action in response to our
previous recommendations and sound business planning processes.  Staff were
clear on their roles and what was expected of them and planning to deal with
vacancies and staff absences was robust, whilst still being compassionate.
Compliance with core competency training requirements had suffered significantly as
a result of the pandemic, but the issue was being gripped effectively by the new
Learning and Development Manager. 
The main concern was the lack of a structured plan for assessing how the prison
operated in relation to its Equality and Diversity (E&D) obligations.  The prison would
also benefit from more detailed statistical monitoring to safeguard against
unintentional bias in the operation of systems affecting employment and educational
opportunities or responses to complaints and prisoner indiscipline. 
While the GIC had helpfully begun a process of engagement with unit managers and
some of the people who reported to them, we encourage further efforts to
consolidate communication and engagement with front line staff.  There is also a
need to ensure managers give greater priority to the completion of staff appraisals. 
In terms of the PANEL principles for this Standard: 
Participation. The suspension of PIACs during the majority of the pandemic
was disappointing as it significantly restricted the ability of prisoners to
contribute to any discussion or decision making about the running of the prison

Page 227

88 
regime. While the need to comply with COVID-19 related guidance around
social distancing, etc., is fully recognised, there were parts of the prison where
PIACs could have been held in line with Public Health Scotland guidance. 
Accountability.  To their credit, the prison had unquestionably taken decisive
action to address the areas of poor performance identified in the previous
HMIPS inspection report. Understandably staff training to support their roles
within the prison and maintain core competency had been significantly
impacted by the pandemic. The prison estimated it would take a year to
achieve full compliance again with core training which was a concern,
particularly in relation to control and restraint procedures, but the prison had a
clear plan for addressing that. 
Non-discrimination and equality. While the prison spoke eloquently of what
it had done before the pandemic to promote Equality and Diversity, the lack of
any up to date structured plan to assess and promote E&D at the time of our
inspection was a major concern.  It is imperative that the whole agenda around
E&D is swiftly re-energised. 
Empowerment. While staff-prisoner relationships were witnessed by
inspectors as positive and respectful throughout the prison, the length of the
gap in the running of any PIAC during the pandemic left a concern about the
commitment to empower prisoners to participate and claim their entitlements.
Without an effective system of PIACs and focus groups it is difficult to see how
prisoners can feel that their voice matters.  Nevertheless, at the time of our
inspection PIACs had begun to be re-established. 
Legality.  There were no issues in relation to this standard regarding upholding
the legal rights of prisoners as set out in domestic and international laws. 
Encouraging observations 
 Respectful staff – prisoner relationships, with motivated committed staff.
 The swift and effective response by management to investigating and
responding to some issues raised by inspectors during the inspection and clear
evidence of action to address previous inspection recommendations. 
Emerging concerns 
 The lack of a structured plan for assessing the extent to which the prison
currently meets its E&D obligations and where improvements are necessary.
 Difficulties achieving core training competency levels due to operational
restrictions posed by the pandemic.
 The loss of opportunities for prisoners to inform or influence decision making
during the pandemic when PIACs were suspended.
 The need to improve communication and engagement with front line staff,
building on recent helpful initiatives by the GIC.
 Poor completion rates for staff appraisals in 2020-21.
 Recent tensions between the trade union side and the management team,
although relationships appeared to be improving at the time of our inspection

Page 228

89 
 The Senior Management Team (SMT) and a number of management posts
below that had been occupied on a temporary promotion basis for over two
years.

Page 229

90 
Quality Indicators 
8.1 The prison’s Equality and Diversity Strategy meets the legal
requirements of all groups of prisoners, including those with protected
characteristics. Staff understand and play an active role in implementing the
Strategy. 
Rating:  Poor 
COVID-19 and a reorganisation within the management team as a result of a
medical retirement had impacted on efforts to promote and safeguard Equality and
Diversity (E&D).  The prison was able to talk about constructive partnership working
developed in the past with Alzheimers Scotland, previous themed events in the
prison and local training previously delivered on E&D, but action had paused
completely during the pandemic and the prison was only just starting to re-engage
with the agenda. 
At the time of the inspection the first meeting of a new operational E&D group had
taken place, but no local E&D Strategy or Action Plan had been developed.  Monthly
meetings of the operational E&D group were planned, along with quarterly meetings
with the Governor with a more strategic focus on E&D. 
The E&D Manager was only covering the role on a temporary basis resulting in the
lack of a dedicated resource with appropriate specific training or experience around
Equality & Diversity.  The prison would benefit from conducting more systematic
monitoring of data around opportunities for those with protected characteristics, and
their involvement in disciplinary processes, relative to other prisoner groups to
ensure no unintentional discrimination was occurring. 
Recommendation 41: HMP Shotts should prioritise re-energising the E&D
agenda, including regular meetings of the E&D committee with prisoner
representation, development of an E&D action plan, more systematic
monitoring of data to avoid unintentional bias with employment, education and
discipline, etc., and provide comprehensive training for the E&D Manager. 
8.2 Appropriate action has been taken in response to recommendations of
oversight and scrutiny authorities that have reported on the performance of
the prison. 
Rating:  Satisfactory 
The SPS and NHS prison healthcare teams were clear on the areas where
performance improvements had to be prioritised after the previous HMIPS 2017
inspection report, and good progress had been made in several areas.  Inspectors
were pleased to see significant improvements had been achieved in relation to the
range of educational opportunities and activities and development of the library.
Inspectors also welcomed a notable improvement in mental health support since the
last inspection.

Page 230

91 
The prison conducted PRL audits on a systematic basis and there was also evidence
of the prison responding to audit and assurance exercises carried out by SPS HQ.
The reliability of some of the findings in these PRL audits might be questioned,
however, as the one on E&D had provided substantial assurance, which did not tally
with our own inspection. 
8.3 The prison successfully implements plans to improve performance
against these Standards, and the management team make regular and
effective use of information to do so.  Management give clear leadership and
communicate the prison’s priorities effectively. 
Rating:  Satisfactory 
The prison had a clear business plan based around five core themes of
development, engagement, impact, standards and collaboration.  Progress against
the plan was carefully tracked and recorded, with clarity around which tasks had
been completed and where slippage against the original envisaged timetable had
occurred. Monthly business planning meetings provided a forum for discussing
progress. 
Staff had been given the opportunity to input into the 2019/20 business planning
process, but the pandemic had interfered with that process for systematic
engagement. The prison intended to reinstate the engagement process for the next
round of business planning. 
The GIC had recently started a series of engagement sessions with Unit Managers,
who were encouraged to bring in some of their own direct reports for an open
discussion on where and how improvement could be made.  There was also a
weekly meeting of FLMs every Monday and roster meetings every Wednesday.  A
brief was also emailed to all staff every month which provided an update on action in
response to issues raised by staff.  Despite these forums for engagement and
communication, front line staff often criticised a lack of communication from
management or what they perceived as late communication.  Although this seemed
to relate partly to changes in guidance around COVID-19 from Public Health
Scotland, which the management team were obliged to implement without delay,
there was evidence of the value of further strengthening communication with front
line staff. 
We were concerned, however, that the Senior Management Team (SMT) and a
number of management posts below that, had been occupied on a temporary
promotion basis for over two years; this was not conducive to stability and longer
term planning so we urge the SPS to secure some more permanent arrangements
as soon as possible. 
Recommendation 42: The GIC should build on recent efforts to improve
communications and engagement with staff, particularly with front line staff.
Face-to-face discussions with larger groups of staff would be helpful.

Page 231

92 
8.4 Staff are clear about the contribution they are expected to make to the
priorities of the prison, and are trained to fulfil the requirements of their role.
Succession and development training plans are in place. 
Rating:  Generally acceptable 
Staff were clear about their roles and the contribution they were expected to make to
the prison’s priorities, but regimes staff in particular found it hard having to cover for
the absence of residential staff as it was more difficult for them to answer prisoners’
queries.  Despite frustrations for some staff around being pulled away from their
specialised functions, most staff expressed a strong commitment and motivation to
their roles within the prison. 
Contingency plans for a range of potential issues were in place within the prison and
there was regular and robust monitoring of anticipated vacancies and those
expected to return to work to inform planned recruitment needs.  Management also
understood the issues they faced in managing succession issues within the prison.
They were acutely aware, for instance, of the number of staff who were moving
towards retirement age in the next few years and of the high number of individuals
acting up at different levels within the organisation.  They had plans in place to bring
longer term stability to the staffing structure, but their planning was to some extent
dependent on decisions elsewhere or national recruitment by SPS HQ. 
The prison had an overall record of 78% compliance for core competency training,
with significantly lower compliance rates around Personal Protection Training, C&R,
Fire Response Procedures and Emergency Response.  Although still new to the
post, the prison’s new Learning and Development Manager had a strong grip on
these training priorities such as the need to focus on C&R training.  COVID-19
restrictions during the pandemic had necessitated a lengthy pause in C&R training,
and the prison estimated that it would take a year to recover due to limitations posed
by the Training Variable and the challenges in securing staff availability.  This was a
concern, particularly in relation to the limited number of staff still in competency to
conduct planned removals and other C&R processes. 
More positively the Learning and Development Manager was committed to
embedding control and monitoring of training around the MyLo system, with the aim
of ensuring that the principal responsibility for meeting training requirements rested
more clearly with individuals and their line managers. 
Awareness raising and informal mentoring and shadowing opportunities to support
those seeking promotion were in place, but a more structured approach might be
beneficial. 
8.5 Staff at all levels and in each functional staff group understand and
respect the value of work undertaken by others. 
Rating:  Generally acceptable 
The staffing challenges posed by COVID-19 related absences often required
regimes staff to temporarily suspend their work parties and help their residential staff

Page 232

93 
colleagues. Although it was difficult for regimes staff to fill in for residential staff, they
accepted the need to do so and this helped facilitate recognition of respective roles
and challenges. Front line SPS and NHS staff were required to work effectively
together on a daily basis and again there was generally a respectful recognition of
respective roles and shared challenges.  The GIC and Deputy Governor took
opportunities to rotate individuals into different roles to widen experience and support
respect for the work of others. 
However, before the inspection there had been significant tensions in the
relationship between the GIC and the local trade union representatives over a
number of important issues which had clearly been difficult for all involved and which
had contributed to some significant instability prior to our inspection. It was
encouraging therefore to hear both the GIC and the trade union representatives
suggest that relationships had started to improve, and we hope that continues. 
8.6 Good performance at work is recognised by the prison in ways that are
valued by staff. Effective steps are taken to remedy inappropriate behaviour
or poor performance. 
Rating:  Generally acceptable 
The prison had a robust but caring approach to managing staff absences,
implementing return to work interviews and monitoring absences effectively.  The
total number of staff absences had reduced from 93 at Christmas 2021 to 27 at the
time of our inspection, which was encouraging. 
The Staff Recognition Committee chaired by the HR Manager with representation
from across the prison encouraged and discussed nominations for Governor awards.
Individuals chosen by the Governor to receive such an award were given the choice
on whether they wished to be presented with the award in front of their peers or
preferred to receive the award in private.  It was pleasing to see the Staff
Recognition noticeboard refreshed with more recent photographs during the course
of our inspection. A medal was presented to all staff reaching 20 years’ service and
inspectors welcomed the establishment of an Achievement Tree with the names of
those staff with 25 years’ service engraved on metal leaves. 
However, even recognising the exceptional additional challenges posed for the
prison by the pandemic, it was disappointing to see that the completion rate for staff
appraisals for 2020-21 was only 46%, despite evidence of reminders being sent.
Inspectors hope that with COVID pressures now receding, management at all levels
will now give the completion of staff appraisals the priority it deserves. 
Recommendation 43: HMP Shotts should give greater priority to the
completion of staff appraisals, ensuring improved completion rates for 2021-22
and future years.

Page 233

94 
8.7 The prison is effective in fostering supportive working relationships with
other parts of the prison service and the wider justice system, including
organisations working in partnership to support prisoners and provide
services during custody or on release. 
Rating:  Satisfactory 
The GIC contributed to the Criminal Justice Partnerships for North and South
Lanarkshire and West Lothian, but Shotts acts as a national facility with prisoners
often returning to a local prison prior to liberation; it simply wouldn’t be possible for
the GIC to attend all community justice partnerships across the country.  However,
the prison worked alongside Police Scotland and MAPPA colleagues as required
around public protection issues. It also supported the work of the Addictions Drugs
Partnership for Lanarkshire, contributing specifically around drug related deaths and
consideration of what more could be done within the prison and local community to
reduce risks. 
At the time of the inspection the prison was exploring a range of initiatives to provide
for those in their care such as Street Soccer and Street Cones.  The prison hoped to
bring the Metro Big Band to HMP Shotts, when they appeared at the Edinburgh
Fringe, and to renew their previously successful partnership with Alzheimers
Scotland to build on the work that had been suspended during COVID-19.  A lot of
these initiatives were at a very early stage at the time of our inspection, but it was
encouraging to hear discussion of them as part of the planned recovery from
COVID-19. 
8.8 The prison is effective in communicating its work to the public and in
maintaining constructive relationships with local and national media. 
Rating:  Satisfactory 
As with other prisons, most media issues were dealt with by the national
communications team within SPS HQ.  However, the GIC had taken part in a
recently aired BBC Scotland TV programme “My Kind of Town” partly to explain the
importance of the prison within the local community. 
A local community group GBTS operated within the HMP Shotts Visitor Centre, and
the prison management team appreciated the contribution they made to family visits
and the successful running of themed events for prisoners and families.

Page 234

95 
STANDARD 9 - HEALTH AND WELLBEING 
The prison takes all reasonable steps to ensure the health and wellbeing of all
prisoners. 
All prisoners receive care and treatment which takes account of all relevant
NHS standards, guidelines and evidence-based treatments.  Healthcare
professionals play an effective role in preventing harm associated with prison
life and in promoting the health and wellbeing of all prisoners. 
Inspection Findings 
Overall rating:  Poor 
In this standard, five quality indicators were rated as satisfactory, six were rated as
generally acceptable and five were rated as poor, giving an overall rating of poor.
This grading is reflective of the significant and sustained pressures on staff and the
detrimental impact on patients receiving care.  This is not a reflection of the
considerable efforts made by staff within HMP Shotts or the North Lanarkshire
Health and Social Care Partnership (HSCP) to support the healthcare needs of
patients in HMP Shotts. 
There were 12 examples of good practice and 22 recommendations for
improvement. 
The Healthcare Team had experienced significant and sustained staff shortages
across all disciplines.  Continued staff shortages had impacted on the team’s ability
to provide adequate staffing and maintain a safe skill mix on some occasions.  As
described in the escalation below and in QI 9.2 and QI 9.6, there was no GP cover
after 1.30pm.  As a direct result of absences within the Senior Leadership team, staff
reported they were not receiving one to one support or clinical supervision in any
consistent pattern. Staff morale was low and staff were reporting fatigue.  The
fragility in the workforce was a significant concern and was escalated during the
inspection. Senior managers were aware of the ongoing challenges for staff in
HMP Shotts.  Inspectors were provided with evidence of the service model review
commissioned by senior management from North Lanarkshire HSCP. 
The lack of medical cover was impacting on the ability to provide long-term condition
management of patients.  All patients’ records are kept in the electronic Vision
patient record system. It was not clear how staff were using the full function of this
system effectively to collect data for patients with long-term health conditions.  These
factors have led to a systematic failure to deliver long-term condition reviews and
oversight. 
The clinical pharmacy role was not patient facing and was not shown to be
accessible for the population of HMP Shotts to discuss their medications with a
member of the Pharmacy Team.  This was not equitable to what is provided within
the community in NHS Lanarkshire and is a concern.  North Lanarkshire’s HSCP
must action the recommendations made in their service review regarding pharmacy
provision and support as a matter of priority.  It was not clear how the Pharmacy

Page 235

96 
Team links to the NHS Lanarkshire Pharmacy Service for professional support and
development.  Our clinical partner’s discussion with the pharmacy adviser identified
challenges with building effective working relationships with GPs to improve
prescribing practices and the potential to develop multi-disciplinary team (MDT)
working to improve patient outcomes. 
Registered nurses had the responsibility of reviewing complaints.  There was no
evidence as to whether staff had received training on how to review, respond and
escalate complaints. Whilst staff had the opportunity to have informal discussions
between themselves about complaints, there was no formal process in place to
share learning from complaints.  Inspectors were told that staff meetings were not
taking place at the time of our inspection due to staffing shortages 
Inspectors were told that secondary care appointments were being sent by post
because of issues with the IT systems in HMP Shotts, which presented a significant
data risk.  Inspectors were informed, during the inspection, that practice had
changed and all referrals to secondary care were being managed electronically,
directly to the NHS board, and postal referrals would be stopped. Inspectors will
follow this up as part of their revisit. 
Escalation 
During the inspection, gaps were identified in senior clinical staffing resource during
periods of the day, with no GP cover provided between 1:30 pm and 6pm. GP cover
was provided in the health centre in the mornings and after 6pm, on-call GP facilities
were available.  This was highlighted during the previous inspection in 2017.  Further
to this, there were only two Band 5 Registered General Nurses (RGNs) on shift from
3:30pm until 6pm to undertake clinical duties, such as medication rounds and attend
emergency calls (code red/code blue). 
Emerging concerns: 
 The prison is open to activities during 3:30pm until 6pm and therefore there is an
increased risk of incidents.
 There is no clear mechanism for the Band 5 RGNs to discuss concerns, or get
support around clinical decision making for deteriorating patients during this
period of time.
 Contacting the Scottish Ambulance Service for emergency response is the
default position, as there is no other way to obtain measurable clinical advice. 
It was important to note that following a restructure and changes in both leadership
and responsibility of prisoner healthcare.  In response to North Lanarkshire’s HSCP
identifying underlying challenges in healthcare delivery, a service model review of
HMP Shotts was carried out in March 2022 and an action plan was developed.
Inspectors reviewed both the service review and action plan provided and were
encouraged to see many of the issues identified throughout the inspection and
planned improvements. These had been assigned senior leadership, however were
yet to have identified timelines.  At the time of the inspection, we were not fully
assured that all risks were being safely managed. Interim measures were needed to
reduce potential risks, support staff and maintain the safety of the patients.

Page 236

97 
We asked the Partnership to urgently review the service provision between 1.30pm
and 6pm; identifying what clinical services and support is required to ensure the health
needs of the prison population is equable with the community. 
We have escalated the above concerns internally within Healthcare Improvement
Scotland and with the Clinical Service Manager for HMP Shotts and advised that we
would be formally escalating these concerns to the North Lanarkshire Health & Social
Care Partnership, NHS Chief Executive and SPS Chief Executive. These are outlined
in QI 9.2, QI 9.6, QI 9.8 and QI 9.16. 
Primary care 
Patients could self-refer to healthcare services within the prison using a confidential
self-referral system.  Referral forms were available in the residential areas, with
some in picture format.  Self-referral forms were collected daily from a locked box by
healthcare staff and then triaged to the appropriate service.  GPs were available
each day until 1:30pm in HMP Shotts.  However, no medical cover was provided
from 1.30pm to 6pm until the out of hours’ service became available at 6pm. The
absence of medical cover during these times is a significant risk for patients and
staff. Healthcare staffing was also reduced from 3:30pm. The variable levels of GP
cover within the establishment was raised as a concern and were escalated during
the inspection. Inspectors were told that patients would be seen by a GP within
two weeks, or by a nurse within two days, depending on the medical need. 
After a patient was reviewed by nursing staff, inspectors observed the nurse record
notes in the Vision system. Inspectors saw that a standard Situation background
assessment recommendation (SBAR) approach to record keeping was generally
used. However, the level of detail that was included varied. 
Mental Health 
There were processes in place on transfer to prison to identify patients requiring
access to mental health services A referral system was open to all staff and self-
referrals.  Patients were triaged daily and followed up based on the level of urgency.
At the time of inspection patients were waiting up to 6 weeks, urgent referrals could
be seen within 72 hours if required. 
A multi-disciplinary meeting took place weekly between the Mental Health and
Addictions Team discussing number of areas including; patients currently on Talk to
Me, hospital referrals, upcoming liberations (including follow up arrangements), Care
Programme Approach (CPA) plans for patients returning from hospital and waiting
times for each discipline. There was evidence of liaison with Community Mental
Health Teams (CMHT) pre-liberation and attendance at prisons suicide prevention
strategy Talk to Me (TTM) case conferences.  This was shared with primary care
outside of mental health nursing hours.  Psychiatry clinics took place regularly and
urgent requests for consultations were responded to. 
Improvements were evident, since the last inspection, based on the introduction of
standardised assessment tools which was not previously in place. However, North
Lanarkshire HSCP should introduce an electronic system to record and update

Page 237

98 
documents to keep documents live and ensure the most up to date information is
accessible. 
There was no process in place for accessing specialist support in intellectual
disabilities, autistic spectrum disorder, neuropsychiatric disorders and cognitive
impairment. 
Substance misuse 
Individuals requiring support with drug and alcohol dependence were identified
during their initial health assessment on transfer to the prison.  A process was in
place for patients who were receiving Opiate Substitution Therapy (OST) to continue
their treatment upon transfer.  Psychological support was available to patients in
several forms.  There was evidence of collaborative working and clear
communication between SPS and the Addictions Team. This was through the
multidisciplinary Substance Misuse Group which gave opportunities to discuss
prisoners who may benefit from support from the Addictions Team.  There was a
discharge planning process in place to ensure continuity of care for those patients
preparing for liberation.  Harm reduction sessions were available to patients due to
be liberated covering CPR training, overdose prevention and use of injectable
naloxone. 
Person centred care plans are in place with evidence of patient involvement.
However, there were some limitations in regards to patient choice of OST due to the
HSCP awaiting allocation of funding. Senior management were following this up at
the time of the inspection. 
Long-term conditions, palliative and end of life care 
Inspectors saw that admission screening identifies patients with long-term health
conditions.  However, it was not clear what follow up of long-term health conditions
was in place or how this informed care planning.  This is a significant concern.  No
long-term condition clinics or annual reviews were taking place at the time of
inspection in HMP Shotts. 
A standardised national assessment tool, Supportive and Palliative Care Indicators
Tool (SPICT) was in place in HMP Shotts to assess both palliative and end of life
care needs. Palliative care, when required, was delivered in conjunction with both
NHS and SPS. Development of Anticipatory Care Plans (ACPs) had been
compromised by the pandemic and competing staffing priorities.  However,
continued work with St Andrews Hospice was identified as a priority for healthcare
staff in HMP Shotts to continue to develop the work around ACPs and attendance at
the Macmillan Palliative Care Team in custody group. 
All patients assessed on admission who had an identified life-limiting illness were
added to the palliative care register and Anticipatory Care Plans (ACPs) were put in
place. The electronically available ACPs were reviewed on an ongoing basis and
were owned by the patient.  Inspectors saw evidence of these for some patients with
long-term conditions during the inspection.

Page 238

99 
Infection, prevention and control 
All areas, where healthcare was delivered, were in a good state of repair and were
clean and ready for use.  During the inspection, inspectors found the clinical
equipment was clean and ready for use and completed cleaning schedules were
available for review. Inspectors saw evidence of a rolling programme of audits in
place. Staff were knowledgeable regarding standard infection control precautions
and had adequate supplies of PPE.  The cleaning resource provided was sufficient
and cleanliness was of a good standard. 
Encouraging observations 
 Patients receive information at admission identifying services that are available to
them regarding healthcare and how to refer to these services.
 Where secondary care appointments were missed, the GP triaged these
appointments so that the most clinically urgent were prioritised to be rescheduled.
 Healthcare and SPS staff worked collaboratively to provide transport for these
clinically urgent appointments with GEOAmey to support this.
 Prisoner information channel used to share health promotion notices including a
podcast with information on oral health, mental health support and a mindfulness
group which was run by psychology.
 Links with education department delivering heart health course and mental health
stigma workshop.
 An emotional resource group facilitated by psychology was piloted within the
prison with positive feedback received.  The group focussed on supporting
prisoners to improve their awareness, recognition and regulation of difficult
emotions.
 At the request of SPS, psychology recently started facilitating drop in support
sessions following adverse events within the prison.  The sessions focus on
psychoeducation and signposting to services to provide support to those who
may have witnessed a traumatic incident or be emotionally impacted by an
adverse event.
 A multidisciplinary substance misuse group has recently been restarted; the
Addictions Team and SPS staff meet monthly to discuss any prisoners who may
benefit from input from the Addictions Team.
 Anti-bacterial hand sanitisers were available and a system in place to
decontaminate the boxes used for personal belongings at security for visitors to
HMP Shotts.
 A newsletter is produced from the daily huddles which would include any
changes to guidance to be shared with staff.
 The daily huddle was used as a mechanism to RAG rate staffing insufficiencies
and seek solutions amongst other patient centred discussions.
 In response to identification of underlying challenges in healthcare delivery a
Service Model Review of HMP Shotts was carried out in March 2022 and an
action plan was developed. HIS inspectors will look for evidence of
implementation of this action plan in future inspections.

Page 239

100 
Emerging concerns 
 North Lanarkshire HSCP must ensure that all prisoners transferred to HMP
Shotts are reviewed by a nurse before being admitted into the prison.
 North Lanarkshire HSCP must develop a pathway to ensure patients receive
psychiatry follow up when transferred.
 National co-ordination and discussion with partner agencies (such as Police
Scotland, Scottish Courts, GEOAmey and SPS) is required to ensure that people
arrive at the prison during the prison’s core opening times or when nursing
resource is available.
 North Lanarkshire HSCP must provide a room that is clean and clutter free at
reception.
 North Lanarkshire HSCP must revise without delay, the process in place when
identifying long term health conditions and provide assurance that patients are
reviewed in line with what is equitable in the community to address health
inequalities.
 North Lanarkshire HSCP must implement a system for secondary care referrals
that ensures patient confidentiality is protected.
 North Lanarkshire HSCP must ensure that all eligible patients who wish to be
involved in national screening programmes are supported to do so and that this is
clearly documented in the patients VISON record.
 North Lanarkshire HSCP must ensure that checks on emergency equipment are
carried out within the agreed timeframe and that these checks are clearly
recorded.
 North Lanarkshire HSCP as a matter of urgency must review the medical cover
available in the afternoons to -
(i) ensure the risk to patients is reduced.
(ii) support nursing staff in dealing with emergency situations.
 North Lanarkshire HSCP must ensure that patients are able to access national
screening programmes in line with community provision and keep accurate
records of attendance.
 North Lanarkshire HSCP must introduce an electronic system to record and
update documents to keep documents live and ensure the most up to date
information is accessible.
 North Lanarkshire HSCP must develop a pathway for accessing specialist
support in intellectual disabilities, autistic spectrum disorder, neuropsychiatric
disorders and cognitive impairment.
 North Lanarkshire HSCP must ensure that person centred care plans and
appropriate risk assessments are in place for all patients with long-term
conditions and that these are reviewed regularly.
 As a priority North Lanarkshire’s HSCP must action the recommendations made
in their service review regarding pharmacy provision and support to provide a
service equitable with the community.
 NHS Lanarkshire’s pharmacy service must provide structured and regular
support to staff involved in supporting pharmacy services within HMP Shotts.
 North Lanarkshire HSCP and SPS must seek solutions to assist staff to
administer medication at a suitable and therapeutic time.
 NHS Lanarkshire HSCP should consider the reintroduction of the oral health
educator role to support the dental service.

Page 240

101 
 NHS Lanarkshire HSCP and SPS must ensure complaints forms are available in
alternative formats and languages to ensure all patients can provide feedback,
raise concerns and complain.
 NHS Lanarkshire HSCP must ensure that all staff managing complaints receive
training to ensure that all complaints are correctly managed.
 NHS Lanarkshire HSCP should develop a process to discuss complaints to share
learning and identify any themes or required improvements.
 NHS Lanarkshire HSCP must ensure that alternative and consistent IT solutions
are provided to support clinical staff as referrals by post is a significant data
breach.
 North Lanarkshire HSCP must demonstrate implementation of recommendations
from service review and provide clear pathways to support staff on site in HMP
Shotts in the absence of senior staff.

Page 241

102 
Quality Indicators 
9.1 An assessment of the individual’s immediate health and wellbeing is
undertaken as part of the admission process to inform care planning. 
Rating:  Generally acceptable performance 
HMP Shotts receives prisoners who are transferred from other prisons. All prisoners
should receive a healthcare assessment by a nurse prior to being admitted into the
prison. However, inspectors were told that some prisoners were not assessed until
the following day due to staffing and workload pressures.  During the inspection,
inspectors observed the admission process. The immediate health and wellbeing
needs of patients were identified on arrival by a registered nurse. Nursing staff used
a standard health screening tool to carry out the process. Staff were observed to
ensure the patient’s dignity and confidentiality was maintained throughout their
health screening. 
Good systems and processes were in place to ensure that all the patient’s
healthcare needs were identified during the screening assessment.  These were
documented in the Vision patient record system and shared with the appropriate
Healthcare Teams. Inspectors were made aware that not all patients requiring
psychiatry support intervention had been followed up.  This is a concern.
Inspectors were told work was being undertaken to develop a pathway to ensure
early identification of patients requiring follow up. Inspectors will review the progress
of this work. 
Patients receive information at admission identifying services that are available to
them regarding healthcare and how to refer to these services. This is good
practice. 
Patients identified as requiring to see the GP are reviewed the following day.
Medicines reconciliation takes place the following day by the GP and all drugs are
prescribed onto the patient’s medication administration record (Kardex). 
Anyone identified as being at risk of self-harm or suicide is managed in line with the
prison’s suicide prevention strategy; TTM. People coming into prison should be
assessed for risk of self-harm. However, this system does not work when prisoners
are transferred into HMP Shotts after 6pm. This is a significant concern for prisoners
as there was no nursing cover provided after this time.  During the inspection,
inspectors were provided with details of the number of prisoners who had been
admitted after 6pm during the period from May 2021 to May 2022. All prisoner
transfers were facilitated by GEOAmey. 
While the room used for screening provided a confidential space, it was cluttered
and had been identified in previous reports as being unfit for purpose.  HMP Shotts
must provide a room that is clean and clutter free to enable access to the hand
washing facilities.

Page 242

103 
Inspectors saw that systems and processes were in place to identify any patient unfit
to be detained in prison, and appropriate actions were taken to maintain the safety of
these patients. 
Recommendation 44: North Lanarkshire HSCP must ensure that all prisoners
transferred to HMP Shotts are reviewed by a nurse before being admitted into
the prison. 
Recommendation 45: North Lanarkshire HSCP must develop a pathway to
ensure patients receive psychiatry follow up when transferred. 
Recommendation 46: National co-ordination and discussion with partner
agencies (such as Police Scotland, Scottish Courts, GEOAmey and SPS) is
required to ensure that people arrive at the prison during the prison’s core
opening times or when nursing resource is available. 
Recommendation 47: North Lanarkshire HSCP must provide a room that is
clean and clutter free at reception. 
Good practice 12:  Patients receive information at admission identifying
services that are available to them regarding healthcare and how to refer to
these services. 
9.2 The individual’s healthcare needs are assessed and addressed
throughout the individual’s stay in prison. 
Rating: Generally acceptable performance 
Following their initial health screening assessment, the patient’s medical history and
prescribed medication was reviewed by a GP. The outcome of the assessment was
recorded onto the patient’s Vision care record. 
Inspectors were told that, as part of the admission process, prisoners were provided
with a pack that contained information about healthcare services available at
HMP Shotts.  Healthcare information was also displayed in the residential areas.
Patients could self-refer to healthcare using a confidential self-referral system.
Referral forms were available in the residential areas, with some in picture format.
Self-referral forms were collected from a locked box by healthcare staff and then
triaged to the appropriate service.  Patients not seen in the residential areas that
day, after having their referrals triaged, were given letters to let them know their
appointment time. Inspectors were told that patients would be seen by a GP within
two weeks, or by a nurse within two days, depending on the medical need. 
After a patient was reviewed by nursing staff, inspectors observed the nurse
recorded notes in Vision.  Inspectors saw that a standard SBAR approach to record
keeping was generally used. However, the level of detail that was included varied. 
Inspectors saw that admission screening identifies patients with long-term health
conditions.  However, it was not clear what follow up of long-term health conditions
was in place or how this informed care planning.  This is a significant concern, as

Page 243

104 
there was no process in place to provide follow up or review of long term health
conditions in line with community provision. 
Near Me (a video calling system that allows patients to attend appointments
remotely) was in place for secondary care appointments.  Patients going out of
prison to attend any external appointments were supported by GEOAmey. Where
secondary care appointments were missed, the GP triaged these so that the most
clinically urgent appointments were prioritised to be rescheduled.  This is good
practice.  Inspectors were told that healthcare and SPS staff worked collaboratively
to provide transport for these clinically urgent appointments with GEOAmey to
support this. This is good practice.  Patients who missed their secondary care
appointments were issued with a letter from the health centre to confirm the
appointment would be rescheduled. 
Referrals to secondary care were in paper format and posted to the appropriate
specialist service. This is a significant concern. Inspectors discussed the risks to
patient confidentiality with this process with healthcare staff.  During the inspection,
the staff implemented a temporary process so that referrals will now be emailed
securely and told inspectors that they will continue to look for more permanent
solution. 
Inspectors were told that patients eligible for national screening programmes like
bowel and abdominal aortic aneurysm screening would be supported to participate in
these.  However, inspectors could not find clear evidence in a patient’s Vision care
record that this had happened. 
Patients who required social care to support them with their personal care needs,
were provided access to this through an external care company. SPS can refer to
this service and it was reported to be working well.  There was also a clear process
for healthcare staff to refer patients to occupational therapy, where assistive
equipment was required to help support their care needs. 
Emergency equipment was in place and was found to be well maintained and
organised. Emergency medication was found to be in date. Emergency equipment
should be checked weekly. However, inspectors found that although equipment
checks were being regularly carried out, this was not consistently recorded.
Inspectors discussed this with staff to ensure that equipment checks are recorded
consistently and evidence compliance with this. 
GPs were available each day until 1.30pm in HMP Shotts, however, no medical
cover was provided from 1.30pm to 6pm until the out of hours’ service became
available at 6pm. The absence of medical cover during these times is a significant
risk for patients and staff. Healthcare staffing is also reduced from 3:30pm.  Nursing
staff told inspectors that this made them feel vulnerable and unsupported.  The lack
of medical cover in the afternoons was escalated at the time of the inspection to the
Clinical Service Manager for HMP Shotts and advised that we would be formally
escalating these concerns to the North Lanarkshire Health & Social Care
Partnership, NHS Chief Executive and SPS Chief Executive.

Page 244

105 
Recommendation 48: North Lanarkshire HSCP must revise without delay, the
process in place when identifying long term health conditions and provide
assurance that patients are reviewed in line with what is equitable in the
community to address health inequalities. 
Recommendation 49: North Lanarkshire HSCP must implement a system for
secondary care referrals that ensures patient confidentiality is protected 
Recommendation 50: North Lanarkshire HSCP must ensure that all eligible
patients who wish to be involved in national screening programmes are
supported to do so and that this is clearly documented in the patients VISON
record. 
Recommendation 51: North Lanarkshire HSCP must ensure that checks on
emergency equipment are carried out within the agreed timeframe and that
these checks are clearly recorded. 
Recommendation 52: North Lanarkshire HSCP as a matter of urgency must
review the medical cover available in the afternoons to: 
(iii) ensure the risk to patients is reduced.
(iv) support nursing staff in dealing with emergency situations. 
Good Practice 13: Where secondary care appointments were missed, the GP
triaged these appointments so that the most clinically urgent were prioritised to
be rescheduled. 
Good Practice 14: Healthcare and SPS staff worked collaboratively to provide
transport for these clinically urgent appointments with GEOAmey to support
this. 
9.3 Health improvement, health prevention and health promotion
information and activities are available for everyone. 
Rating:  Generally acceptable performance 
An opt-out Blood borne virus (BBV) screening programme was in place as part of
the health screening process at the prison. Where patients had not received this
screening at reception, they were able to opt-in to be screened through the
healthcare self-referral form. Health promotion activity was in place in relation to
infectious disease prevention.  This included health education and health
promotion programmes.  However, it was not clear during the inspection what
process was in place to ensure delivery of all national and local age appropriate
health screening.  Inspectors were told that screening appointment invitations
were sent direct to patients but this could not be evidenced in a patient’s Vision
care record. This was a concern. In the absence of a clear recording process,
inspectors cannot be assured that patients are getting access to national
screening and surveillance programmes.

Page 245

106 
A wide variety of health education and health promotion information was available
and displayed in patient areas, including the halls, health centre waiting room and
visitors centre.  Development work was in progress to ensure the leaflets and
posters were available in a variety of formats making them accessible to a wide
range of people. The information displayed included how to make informed
decisions about health; including sexual health information and risks associated
with drug use. 
Healthcare and prison staff worked together to deliver a programme of health
promotion activities based on; health improvement, making better decisions and
understanding the risks of behaviours and choices.  The prisoner information
channel was used to share health promotion notices including a podcast with
information on oral health, mental health support and a mindfulness group which
was run by psychology.  This is good practice. The health improvement staff
worked with the education department to deliver an 8-week heart health course
and a mental health stigma workshop.  This is good practice. 
Peer support was available through cocaine and alcoholics anonymous meetings.
Details on how to attend these mutual aid meetings were displayed in the halls
and patients would be signposted if they were engaged with the Addictions Team. 
All prisons in Scotland are non-smoking establishments. Vapes were made
available to all prisoners in HMP Shotts. Information and support was also
available on nicotine withdrawals and how to reduce or stop vaping. 
Those wanting to access sexual health services in the prison could do so by
completing the healthcare self-referral form. 
Recommendation 53: North Lanarkshire HSCP must ensure that patients
are able to access national screening programmes in line with community
provision and keep accurate records of attendance. 
Good Practice 15: Prisoner information channel used to share health
promotion notices including a podcast with information on oral health, mental
health support and a mindfulness group which was run by psychology. 
Good Practice 16: Links with education department delivering heart health
course and mental health stigma workshop. 
9.4 All stakeholders demonstrate commitment to addressing the health
inequalities of prisoners. 
Rating:  Satisfactory performance 
Healthcare staff described an understanding of health inequalities and were
knowledgeable about the potential barriers to accessing care.  Staff demonstrated a
respectful and professional approach to all patients whilst maintaining confidentiality.
They were supportive and gave explanations of care to be given whilst gaining
consent.  For example, at medication rounds staff took opportunities to support
patients raising other healthcare concerns.

Page 246

107 
We saw evidence that staff are directed to NHS Lanarkshire’s electronic learning
platform where modules on equality and diversity are available.  Staff spoken with
were aware of the Equality Act 2010 and could sign post to where up to date policies
were available on the staff intranet.  Barriers to accessing care were identified at
admission and staff facilitated any requirement to utilise interpreter services. 
9.5 Everyone with a mental health condition has access to treatment
equitable to that available in the community, and is supported with their
wellbeing throughout their stay in prison, on transfer and on release. 
Rating:  Satisfactory performance 
A validated assessment tool was used to assess people referred to the Mental
Health Team. This included an assessment of the patient's mental health, history,
psychosocial factors, identification of risks, formulation of presenting problem and
recommendation for care intervention.  A risk assessment was completed for all
patients at time of assessment and this was routinely updated every six months or in
line with any significant changes in risk. Whilst the service used standardised tools
for assessments and care plans, there was no electronic system in place.  Having an
electronic system would enable staff to record and update documents to keep them
live and ensure the most up-to-date information was accessible. 
Patients were fully involved in their assessment, and had the opportunity to
discuss the purpose and outcome of this assessment.  The risks and benefits of
any treatment or intervention offered were discussed with patients to allow them to
make informed choices about their care.  Individual person-centred outcome
focussed care plans were written with the patient which reflected their goals.
Patients had regular reviews where they were able to discuss and review their
care. 
The multidisciplinary Mental Health Team consisted of health and social care
professionals, including mental health nurses, psychologists and a consultant
psychiatrist.  There are challenges that NHS Lanarkshire are aware of and
identified in the service review regarding the gaps in workforce. Due to the staffing
pressures in the workforce, mainly in primary care, it meant that mental health
nursing staff supported the wider healthcare team when required. 
Whilst psychology provided neuropsychological assessments there was no
process in place to access specialists in intellectual disabilities, autistic spectrum
disorder, neuropsychiatric disorders and cognitive impairment. 
The clinical lead for the team was a consultant psychiatrist, who chaired the
weekly meetings where updates from each discipline were provided.  Discussions
took place about a number of areas including; patients currently on Talk to Me,
hospital referrals, upcoming liberations (including follow up arrangements), Care
Programme Approach (CPA) plans for patients returning from hospital and waiting
times for each discipline. 
A wide range of therapies and treatments, appropriate for the patient population,
were provided within the prison. The Mental Health Team’s operational guidelines

Page 247

108 
details the procedure in place for working in partnership with services including;
GP and physical health team, addiction service, social work, advocacy,
chaplaincy, listener/peer support service and forensic psychology.  The treatments
and interventions offered to patients within the prison are equitable to those
available in the community.  The waiting times at the time of the inspection were
acceptable and no longer than the national waiting times for these services. 
An emotional resource group, facilitated by psychology, had been piloted within
the prison with positive feedback received.  The group focussed on supporting
prisoners to improve their awareness, recognition and regulation of difficult
emotions. This is good practice.  At the request of SPS, psychology have
recently started facilitating drop in support sessions following adverse events
within the prison. The sessions focussed on psychoeducation and signposting to
services to provide support to those who may have witnessed a traumatic incident,
or be emotionally impacted by an adverse event. This is good practice. 
Systems and processes were in place to ensure that any patient requiring
inpatient mental health care is assessed and transferred to hospital under the
Mental Health Care and Treatment (Scotland) Act 2003. 
Robust systems and processes were in place to ensure that patients requiring
community follow-up on release from prison were referred to relevant services.
This also included the provision of detailed discharge summaries. 
Recommendation 54: North Lanarkshire HSCP must introduce an electronic
system to record and update documents to keep documents live and ensure
the most up to date information is accessible. 
Recommendation 55: North Lanarkshire HSCP must develop a pathway for
accessing specialist support in intellectual disabilities, autistic spectrum
disorder, neuropsychiatric disorders and cognitive impairment. 
Good practice 17:  An emotional resource group facilitated by psychology was
piloted within the prison with positive feedback received. The group focussed
on supporting prisoners to improve their awareness, recognition and regulation
of difficult emotions. 
Good Practice 18: At the request of SPS, psychology recently started
facilitating drop in support sessions following adverse events within the prison.
The sessions focus on psychoeducation and signposting to services to provide
support to those who may have witnessed a traumatic incident or be
emotionally impacted by an adverse event.

Page 248

109 
9.6 Everyone with a long-term health condition has access to treatment
equitable to that available in the community, and is supported with their
wellbeing throughout their stay in prison, on transfer and on release. 
Rating:  Poor performance 
Inspectors were told that patients with a long-term condition were identified at their
health screening during admission, through nurse triage or at medicine reconciliation.
However, there was no formal process to ensure that patients were appointed for
ongoing regular reviews. No long-term condition clinics or annual reviews were taking
place in HMP Shotts at the time of inspection. 
Care plans were observed to be in place for some patients with associated risk
assessments. However, the care plans were not person centred or outcome
focussed and there was an inconsistent approach in regard to the implementation
and review of the plans and risk assessments.  Do not attempt cardiopulmonary
resuscitation (DNACPR) forms were seen to be in place for two patients and these
were generally well completed including the discussion with the patient. 
Inspectors were told of continued challenges with nursing staff resources and
capacity this was observed during the inspection, as described in the escalation.
The lack of medical cover was impacting on the ability to provide long term condition
management of patients.  All patient healthcare records are held in the Vision
computer system. It was not clear how staff were using the full function of this
system effectively to collect data for patients with long-term health conditions. These
factors have led to a systematic failure to deliver long-term condition reviews and
oversight. 
Nursing staff described links with community services for support and advice. For
example, the tissue viability service and Diabetes service. This was working well to
support patients. 
Recommendation 56: North Lanarkshire HSCP must ensure that person
centred care plans and appropriate risk assessments are in place for all
patients with long-term conditions and that these are reviewed regularly. 
9.7 Everyone who is dependent on drugs and/or alcohol receives treatment
equitable to that available in the community, and is supported with their
wellbeing throughout their stay in prison, on transfer and on release. 
Rating:  Satisfactory performance 
Patients requiring support with drug and/or alcohol dependence were identified at
health screening on transfer to the prison or as part of their health assessment
appointments, using a validated screening tool. The outcome was documented in
the patient care record.  Patients were also sent a letter signposting them to support
services available within the Addictions Team. As highlighted in QI 9.5 it is a
concern that patient assessments are recorded on paper and scanned.  The service
should review IT options for patient assessments to be stored electronically allowing
live documents (see recommendation in Q.I. 9.5).

Page 249

110 
Systems and processes were in place to confirm prescriptions of those patients
transferred to the prison.  A copy of the Kardex was brought to HMP Shotts from the
transferring prison for patient’s prescribed OST. 
Individual support needs for patients referred to addiction services were identified
through an assessment process. Individual person-centred outcome-focussed
care plans which reflected the support needs required, were in place for all
patients.  There was evidence of patient involvement in the writing of their care
plans which were regularly reviewed, monitored and updated by the patient and
their nurse or caseworker.  Funding was due to be allocated for increasing the
number of patients able to access Buvidal (long acting buprenorphine injections).
Therefore, there were some limitations in terms of promoting patient choice for
OST in line with the MAT standards at the time of the inspection. Senior
managers were aware and liaising with the board to follow up the allocation of
funding. 
Patients were provided with evidence-based pharmacological, harm reduction and
psychological interventions.  These interventions include psychosocial clinical
interventions, relapse management and Cognitive Behaviour Therapy based
psychoeducational work.  A mindfulness group was available to prisoners, facilitated
by an addictions caseworker delivering breath work, mindfulness and meditation. 
Systems and processes were in place to ensure that copies of patients’
medication prescription accompanied patients who were transferred to other
prisons. This system was designed to ensure that there was no delay in
continuing treatment once they arrived at the receiving prison. 
A standardised discharge planning tool was in place and ensured that patients
were referred to community services and information was passed to these
services for continuity of care. This included the early identification of community
prescribers and pharmacies.  All prisoners preparing for liberation were offered a
harm reduction session that covered CPR training, overdose prevention and use
of injectable naloxone use. 
The Addictions Team consisted of a range of multidisciplinary professionals
including addictions nurses, case workers and a lead medical practitioner for
addictions. The team worked closely with the Mental Health Team to allow for a
range of treatments and therapies to be offered to patients.  A multidisciplinary
team meeting took place each week to discuss the allocation of referrals, and the
assessments and reviews of patients.  A medical practitioner for addictions is the
clinical lead for the team. Written systems, protocols and procedures were in
place to describe the joint working with mental health and primary care services
for patients with co-morbidities.  These included regular meetings with mental
health nurses and/or primary care nurses according to the needs of the patients
with co-morbidities.  A multidisciplinary Substance Misuse Group has recently
been restarted; the Addictions Team and SPS staff meet monthly to discuss any
prisoners who may benefit from input from the Addictions Team.  This is good
practice.

Page 250

111 
Good Practice 19: A multidisciplinary substance misuse group has recently
been restarted; the Addictions Team and SPS staff meet monthly to discuss
any prisoners who may benefit from input from the Addictions Team. 
9.8 There is a comprehensive medical and pharmacy service delivered by
the service. 
Rating:  Poor performance 
The Clinical Pharmacy Service delivered within HMP was provided by the national
contract supplied by Lloyds Pharmacy.  The current clinical pharmacy role involves
the regular review of patient Kardexes and providing advice to other members of the
multidisciplinary team. It also involves regular controlled drug checks (as part of the
contract) but does not form part of a Clinical Pharmacy Service.  The role was not
patient facing and was not shown to be accessible for the population of HMP Shotts
to discuss their medications with a member of the Pharmacy Team.  This was not
equitable to what is provided within the community in NHS Lanarkshire and is a
concern. North Lanarkshire’s HSCP shared their service review as part of their
evidence which contained specific recommendations about a Pharmacy Service.
The service must action the recommendations regarding pharmacy provision and
support as a matter of priority. 
NHS Lanarkshire provides HMP Shotts with pharmacy support for six hours per 
week to manage the Lloyds contract. During the discussions in relation to pharmacy,
it was evident that pharmacy had not been part of the self-evaluation process. They
described a lack of ability to influence within the service.  Since the pandemic, they
had been unable to attend the establishment due to a lack of available space. There
was a lack of evidence to support multidisciplinary working in relation to medicines
and the Pharmacy Service. 
The pharmacist described Standard Operating Procedures in place, which pharmacy
had been involved in approving as part of the Home Office License Application.
There was an up-to-date Home Office Licence in place at the time of our inspection. 
The pharmacist described the Prescribing Advisory Group (PAG) which prior to
COVID-19 was well established, with a standing agenda and monitored prescribing
as part of a multidisciplinary discussion.  This was described to be in line with the
current work within primary care which was positive. 
There are strong links with the National Prison Pharmacist Group and the pharmacist
representing NHS Lanarkshire advised that there is regular communication with the
service.  This included updates on outcomes of these meetings via email, telephone
calls and updates through the PAG (when this was operational).  As the PAG has not
been in existence since prior to the COVID-19 pandemic, it was unclear how the
prescribing of medicines and the reviews of these have been managed during the
pandemic. 
Inspectors spoke to staff providing Pharmacy Support Services and management
was being provided by the Primary Healthcare Team.  It was not clear of the wider

Page 251

112 
links to the NHS Lanarkshire Pharmacy Service for professional support and
development. 
The variable levels of GP cover within the establishment was raised as a concern
and were escalated during the inspection.  Discussions with pharmacy staff also
identified challenges with building effective working relationships with GPs to
improve prescribing practices and the potential to develop multi-disciplinary team
working to improve patient outcomes.  For example, the inspectors identified some
inconsistencies and follow up when patients were on high dose antipsychotic
medication.  Inspectors were provided with the service review and acknowledged the
recommendations in relation to medicine cover. 
During our inspection, inspectors reviewed the timings of medication administration.
Some patients had supervised administration as not all patients are suitable for in
possession medication.  Inspectors saw that with the limitations in place due to the
SPS regime, some patients were receiving their sedative medication early, between
3pm to 5pm. This was not therapeutic and was a significant concern. SPS must
seek solutions to assist staff to administer medication at a suitable and therapeutic
time. 
Nursing staff were observed administering medication and inspectors saw this was
carried out safely.  Paperwork in relation to medication administration was generally
well completed. 
Concerns regarding nursing staff wearing radio earpieces during medication
administration and the risk of medication errors was discussed with SPS staff during
the inspection. This practice was changed during the inspection and staff were
being accommodated to turn their radio’s off during medicine administration times. 
Recommendation 57: As a priority North Lanarkshire’s HSCP must action the
recommendations made in their service review regarding pharmacy provision
and support to provide a service equitable with the community. 
Recommendation 58: NHS Lanarkshire’s pharmacy service must provide
structured and regular support to staff involved in supporting pharmacy services
within HMP Shotts. 
Recommendation 59: North Lanarkshire HSCP and SPS must seek solutions
to assist staff to administer medication at a suitable and therapeutic time 
9.9 Support and advice is provided to maintain and maximise individuals’
oral health. 
Rating:  Generally acceptable performance 
Dental care was delivered in a clean and well-maintained environment.  Dental
procedures and management were carried out in line with national and
NHS Lanarkshire guidelines.

Page 252

113 
Patients were able to self-refer to the dental service and were given a letter to inform
them of the date and time of their appointment or that they were on the waiting list.
The dentist was available four days per week and managed their own waiting list,
with a dental hygienist being available one day per week. 
Daily dental lists were managed to allow emergency treatments such as patients with
pain to be seen as quickly as possible, usually the next day.  The waiting time for
other dental emergencies such as broken tooth was approximately two weeks.  The
waiting time for routine examinations was much longer.  Inspectors were told that
patients who required emergency dental care, or who were on treatment plans took
priority over those requesting a routine examination. Inspectors saw the current
waiting list that had 120 patients, the longest wait was from October 2020.
Inspectors were told that the waiting list may not be completely accurate as some
patients on it may have been seen more quickly, as an emergency or may have
been released from prison. Inspectors were told that oversight and management of
the dental waiting list was the responsibility of the Dental Team. 
The dental staff told inspectors that prior to the COVID-19 pandemic there were oral
health educators who worked in the prison, who they considered a good resource.
The oral health educators provided support directly to prisoners and could also be
another source for the referral of patients to the dental service.  Staff told inspectors
that the reintroduction of oral health educators may reduce the number of patients on
the waiting list. 
Clean and used dental instruments were stored appropriately, used and
contaminated instruments were taken off site for decontamination. 
Recommendation 60: NHS Lanarkshire HSCP should consider the
reintroduction of the oral health educator role to support the dental service. 
9.10 All pregnant women, and those caring for babies and young children,
receive care and support equitable to that available in the community, and are
supported with their wellbeing throughout their stay in prison, on transfer and
on release. 
Rating:  Not applicable 
There were no female prisoners in HMP Shotts at the time of the inspection. 
9.11 Everyone with palliative care or end of life care needs can access
treatment and support equitable to that in the community, and is supported
throughout their stay in prison, on transfer and on release. 
Rating:  Generally acceptable 
A standardised national assessment tool, (SPICT) was in place in HMP Shotts to
assess both palliative and end of life care needs. Palliative care when required was
delivered in conjunction with both NHS and SPS.  Development of ACPs had been
compromised by the pandemic and competing staffing priorities.  However,
continued work with St Andrews Hospice was identified as a priority for healthcare

Page 253

114 
staff in HMP Shotts to continue to develop the work around ACPs and attendance at
the Macmillan Palliative Care Team in custody group. 
Staff described how to access all necessary services, facilities and equipment
services to deliver safe, effective, person-centred palliative or end of life care. 
There was evidence of a positive team-working relationship between the Prison
Healthcare Team, NHS board palliative care service and community service.  There
was also strong links identified with Macmillan Palliative Care Team. Community
Occupational Therapy services were accessed through the Community Rehab Team
at University Hospital Wishaw if there was a requirement to assess patients for aids
and adaptation. Staff described a prompt response. 
The accessible cells in HMP Shotts were of a good standard, they were spacious
and well maintained. 
Prior to the pandemic any patients receiving palliative or end of life care were
discussed by both SPS and NHS at a multidisciplinary meeting monthly. Staff were
keen to reinstate this as a priority. 
9.12 Everyone at risk of self-harm or suicide receives safe, effective and
person centred treatment, and support with their wellbeing throughout their
stay in prison, on transfer and on release. 
Rating: Satisfactory performance 
On transfer to the prison, every patient at risk of self-harm or suicide was
assessed using a standardised and validated health screening tool, if the transfer
took place before 6pm. As referenced in QI 9.1 there was no healthcare staff on
duty from 6pm to complete risk assessments and follow the talk to me process. 
Any patient identified as being at risk of self-harm or suicide during their admission
to prison or during their stay in prison were immediately commenced onto TTM.
Inspectors reviewed several completed care plans and found them to be
comprehensive and demonstrated patient involvement.  This included the types of
treatment being offered and were regularly reviewed. 
TTM case conferences were attended by the SPS and where possible a mental
health nurse who was involved in the patients ongoing care.  Mental health
nursing cover was available Monday to Friday 8:30am to 3:30pm.  Any case
conferences taking place outside these times were attended by a primary care
nurse. The Healthcare Team was aware of the importance of a registered mental
health nurse (RMN) attending who knows the patient therefore tried to plan TTM
around this. Patients were also encouraged and supported to participate in their
own case conference. If a translator was required to support the patient this was
booked in advance. All members of the wider Primary Care Nursing Team,
involved in caring for patients had undergone TTM training. 
Evidence of a good multi-disciplinary Mental Health Team (MHT) was in place as
discussed in QI 9.5. The clinical MDT discussed all patients who were in the SRU

Page 254

115 
and being managed under Rule 41 (which relates to accommodation in specific
conditions). There was a suicide prevention meeting with representatives from
SPS and mental health nurses. 
Staff were able to arrange an urgent same day appointment with a mental health nurse
for any patient who appeared to be at immediate risk of self-harm or suicide. 
Each stage of TTM process was clearly documented in the patient record on Vision. 
9.13 All feedback, comments and complaints are managed in line with the
respective local NHS Board policy. All complaints are recorded and responded
to in a timely manner. 
Rating:  Poor performance 
All complaints, comments and feedback were managed in line with the local NHS
complaints policy. 
There was a clear governance structure in place for reporting and responding to
complaints and feedback.  Information posters describing the process were
displayed in patient areas, including the halls and health centre waiting room.
Feedback and comments forms and complaints forms were available in the halls,
the patient waiting area in the health centre and on request from healthcare staff.
These forms were clear and easy to understand in English however, the forms
were not available in alternative formats and languages. 
Systems and processes were in place to record all complaints received in the health
centre along with the date of receipt to ensure they were processed and responded
to within set timescales. 
Systems and processes were in place to ensure that those making complaints would
be acted on without negative consequences to current and future care or support. 
Registered nurses had the responsibility of reviewing complaints.  There was no
evidence if staff had received training on how to review, respond and escalate
complaints. 
Whilst staff had the opportunity to have informal discussions about complaints there
was no formal process in place to share learning from complaints.  Inspectors were
told that staff meetings were currently not taking place due to staffing shortages.  It
would be useful to hold weekly team meetings where learning from complaints can
be disseminated with the wider Healthcare Team. 
Information was provided at the end of each complaint response informing patients of
their right to contact the Scottish Public Services Ombudsman if they were not satisfied
with the outcome or response to their complaint. Information about how to do this was
also included.

Page 255

116 
Recommendation 61: NHS Lanarkshire HSCP and SPS must ensure
complaints forms are available in alternative formats and languages to ensure
all patients can provide feedback, raise concerns and complain. 
Recommendation 62: NHS Lanarkshire HSCP must ensure that all staff
managing complaints receive training to ensure that all complaints are correctly
managed. 
Recommendation 63: NHS Lanarkshire HSCP should develop a process to
discuss complaints to share learning and identify any themes or required
improvements. 
9.14 All NHS staff demonstrate an understanding of the ethical, safety and
procedural responsibilities involved in delivering healthcare in a prison
setting. 
Rating:  Poor performance 
Staff had a clear understanding of their roles and responsibilities in reporting any
situations which could result in physical or psychological harm to those in prison.
Healthcare staff indicated that any issues requiring to be raised as a priority were
recorded on a SPS intelligence report. All registered staff were aware of their legal
obligations for confidentiality and keeping accurate and prompt records, as part of
maintaining their registration and commitment to the Nursing and Midwifery
Council (NMC) code. All staff had their own access to the electronic record keeping
system Vision clinical system.  As part of prison healthcare staff induction, staff were
informed how to report any concerns. 
Inspectors were told that secondary care appointments were being sent by post
because of issues with the IT systems in HMP Shotts, this is a significant data risk. 
Inspectors were made aware during the inspection that practice had changed and all
referrals to secondary care were being managed electronically directly to the NHS
board and postal referrals would be stopped.  Inspectors will follow this up as part of
their revisit. 
Recommendation 64: NHS Lanarkshire HSCP must ensure that alternative and
consistent IT solutions are provided to support clinical staff as referrals by post is a
significant data breach. 
9.15 The prison implements national standards and guidance, and local
NHS Board policies for infection prevention and control. 
Rating: Satisfactory performance 
Inspectors observed good infection control precautions in place at HMP Shotts.  PPE
was available with hand sanitiser and both clinical and domestic waste bins were
available for disposal. Visitors were sign posted to use masks on arrival and to
dispose of when leaving.  At reception, visitors were prompted sanitising the boxes
used for personal belongings, this is good practice.

Page 256

117 
The healthcare centre facility and clinical rooms within HMP Shotts were of a good
standard and were visibly fresh and clean, the fabric was intact and could be
effectively decontaminated.  Inspectors saw areas in the halls where healthcare staff
administer medicines and triage, these were of a good standard and were clean and
ready for use. 
Inspectors saw evidence of daily cleaning schedules with senior nurse oversight and
sign off.  HMP Shotts used an electronic system to upload audits including standard
infection control audits. These were reviewed for compliance by senior staff and
results were shared through staff safety briefs for any non-compliance actions plans
to be completed. These were also shared at the North Hygiene meetings
represented by senior management.  Healthcare staff had standard infection audit
programme in place which included other aspects of healthcare delivery and
compliance.  Cleaning resource was provided by a private contractor supplied by
SPS. The cleaning was of a good standard and staff reported no concerns with
provision.  Trained pass men were responsible for cleaning in residential areas and
were visible throughout the inspection.  The standard of cleanliness in HMP Shotts
was high. 
The health centre is also externally audited by NHS Lanarkshire. Inspectors
observed the most recent audit carried out.  This had identified some areas for
improvement that staff had acted upon. 
Equipment was clean and ready for use and staff were knowledgeable about
standard infection control precautions (SICPs).  Inspectors observed good hand
hygiene practice from staff. Healthcare staff could sign post inspectors to the
National Infection Prevention and Control Manual (NIPCM) through NHS Lanarkshire
intranet platform.  Inspectors saw infection prevention control was part of staff
mandatory training requirements. 
Staff had been fitted for FFP3 masks during the pandemic, these were available in
emergency bags. PPE was readily available in clinical areas and staff were wearing
masks. Inspectors saw some variable compliance with mask wearing from
SPS officers, this was raised at the time of the inspection. Changes to guidance was
discussed at the morning adult services huddle.  A newsletter was produced from
these meetings which would include any changes to guidance to be shared with
staff. This is good practice. 
Good Practice 20: Anti-bacterial hand sanitisers were available and a system
in place to decontaminate the boxes used for personal belongings at security
for visitors to HMP Shotts. 
Good Practice 21: A newsletter is produced from the daily huddles which
would include any changes to guidance to be shared with staff.

Page 257

118 
9.16 The prison healthcare leadership team is proactive in workforce
planning and management. Staff feel supported to deliver safe, effective, and
person-centred care. 
Rating:  Poor performance 
HMP Shotts Healthcare team had experienced significant and sustained staff
shortages across all disciplines.  Continued staff shortages had impacted on the
team ability to provide adequate staffing and maintain a safe skill mix on some
occasions.  During the inspection there were further absences in the Senior
Leadership team for both primary care and mental health services.  Nursing staff
numbers were further reduced to 2 primary care nurses at 3.30pm when other
members of the multidisciplinary team shift ended. From 3.30pm to 6pm their role
was to provide healthcare delivery which included responding to emergencies,
admitting prisoners being transferred from other prisons and delivering medications.
As described in the escalation and in QI 9.2 there was no GP cover after 1.30pm. 
As a direct result of absences within the Senior Leadership team, staff reported they
were not receiving one to one support or clinical supervision in any consistent
pattern. Staff morale was low and staff were reporting fatigue.  The fragility in the
workforce was a significant concern and was escalated during the inspection.  There
was no consistent senior leadership structure in place to support staff in the absence
of medical cover.  Inspectors found all staff to be open and honest about the
challenges in HMP Shotts. Senior managers were aware of the ongoing challenges
for staff in HMP Shotts. Inspectors were provided with evidence of the service model
review commissioned by senior management from North Lanarkshire HSCP. In
response to the identified challenges during a change in leadership accountability for
HMP Shotts prior to the inspection including a workforce review.  This had identified
key areas of improvement and actions which illustrated the significant concerns
raised by inspectors however inspectors raised concerns regarding the staffing
provision both nursing and GP’s, the impact on staff and the impact on patients
because of the lack of provision. 
There was a commitment to review workforce and seek solutions to provide
additional staff and senior oversight in HMP Shotts with a continued recruitment.
This would allow a re-introduction of clinical supervision and one to one support for
staff. Inspectors will follow up the progress of this work with HMP Shotts following
the escalation response and will return to HMP Shotts to review progress. 
There was a mandatory training programme in place which was overseen by senior
management. All staff in HMP Shotts had received an induction programme.
Inspectors participated in the daily huddle which was used as a mechanism to RAG
rate staffing insufficiencies and seek solutions amongst other patient centred
discussion. This is good practice. 
Recommendation 65: North Lanarkshire HSCP must demonstrate
implementation of recommendations from service review and provide clear
pathways to support staff on site in HMP Shotts in the absence of senior staff.

Page 258

119 
Good Practice 22: The daily huddle was used as a mechanism to RAG rate
staffing insufficiencies and seek solutions amongst other patient centred
discussions. 
9.17 There is a commitment from the NHS Board to the delivery of safe,
effective and person-centred care which ensures a culture of continuous
improvement. 
Rating:  Generally acceptable performance 
HMP Shotts Prisoner Healthcare Team was managed by the Adult Health Services
Unit (AHSU) within North Lanarkshire Health & Social Care Partnership (HSCP).  A
restructure of the North Lanarkshire HCSP took place over a year ago resulting in
changes in both leadership and responsibility of Prisoner Healthcare Team.  In
response to identification of underlying challenges in healthcare delivery a service
model review of HMP Shotts was carried out in March 2022 and an action plan was
developed, this is good practice.  Inspectors reviewed both the service review and
action plan provided and were encouraged to see identification of many planned
improvements. These had been assigned senior leadership and yet to have
identified timelines. Inspectors will follow up and review the progress of this work. 
Operational healthcare staff within the prison were aware of the HSCP Leadership
structure and their roles and responsibilities for the ongoing service delivery of
healthcare within the prison. There had been changes in leadership in this structure
in the last year.  Nursing staff could describe the leadership structure but were not
familiar with some of the senior management that were present during the
inspection. 
Senior managers from the North Lanarkshire HSCP were visible in the health centre
during the inspection but did not routinely base themselves in HMP Shotts. 
Inspectors were provided with evidence that prisoner healthcare is represented at all
appropriate NHS Lanarkshire primary care forums. There was leadership and
representation of prisoner healthcare services across the Operational, Governance
and Professional Senior Manager Team forums. 
Where patients had concerns about healthcare delivery, they were encouraged to
report these using the complaints forms available in the residential areas. The
service review had also highlighted plans to improve service delivery by conducting
surveys and questionnaires for patients led by health improvement colleagues. 
Prison healthcare uses the DATIX system to report any adverse events in
NHS Lanarkshire. Reports from this were visible to managers within the HSCP and
were discussed at clinical governance committee meetings.  Inspectors were
provided with minutes of this meeting and saw DATIX relating to prisoner healthcare
being discussed. Staff told inspectors there was inconsistency in reporting due to
staff shortages. Any learning from DATIX incidents was shared with staff verbally as
well as by email.

Page 259

120 
Good Practice 23: In response to identification of underlying challenges in
healthcare delivery a Service Model Review of HMP Shotts was carried out in
March 2022 and an action plan was developed.  HIS inspectors will look for
evidence of implementation of this action plan in future inspections.

Page 260

121 
Annex A 
Summary of Recommendations 
To be updated after matters of fact stage

Page 261

122 
Annex B 
Summary of Good Practice 
To be updated after matters of fact stage

Page 262

123 
Annex C 
SUMMARY OF RATINGS 
Standard/QI Standard rating/QI rating 
Standard 1 – Lawful and Transparent Custody Satisfactory
QI 1.1 Satisfactory
QI 1.2 Satisfactory
QI 1.3 Satisfactory
QI 1.4 Satisfactory
QI 1.5 Satisfactory
QI 1.6 N/A
QI 1.7 Satisfactory
QI 1.8 Generally acceptable
QI 1.9 Satisfactory 
Standard 2 – Decency Generally acceptable
QI 2.1 Satisfactory
QI 2.2 Satisfactory
QI 2.3 Generally acceptable
QI 2.4 Satisfactory
QI 2.5 Satisfactory
QI 2.6 Poor 
Standard 3 – Personal Safety Generally acceptable
QI 3.1 Generally acceptable
QI 3.2 Good
QI 3.3 Generally acceptable
QI 3.4 Generally acceptable
QI 3.5 Satisfactory
QI 3.6 Generally acceptable
QI 3.7 Satisfactory 
Standard 4 – Effective, Courteous
and Humane Exercise of Authority Satisfactory
QI 4.1 Generally acceptable
QI 4.2 Generally acceptable
QI 4.3 Satisfactory
QI 4.4 Satisfactory
QI 4.5 Generally acceptable
QI 4.6 Satisfactory
QI 4.7 Satisfactory
QI 4.8 Satisfactory
QI 4.9 Satisfactory
QI 4.10 Good

Page 263

124 
Standard 5 – Respect, Autonomy and Satisfactory
Protection Against Mistreatment
QI 5.1 Satisfactory
QI 5.2 Satisfactory
QI 5.3 Good
QI 5.4 Satisfactory
QI 5.5 Satisfactory
QI 5.6 Satisfactory
QI 5.7 Satisfactory
QI 5.8 Satisfactory 
Standard 6 – Purposeful Activity Generally acceptable
QI 6.1 Generally acceptable
QI 6.2 Generally acceptable
QI 6.3 Generally acceptable
QI 6.4 Generally acceptable
QI 6.5 Good
QI 6.6 Generally acceptable
QI 6.7 Satisfactory
QI 6.8 Satisfactory
QI 6.9 Generally acceptable
QI 6.10 Satisfactory
QI 6.11 Good
QI 6.12 Good
QI 6.13 Satisfactory
QI 6.14 Generally acceptable
QI 6.15 Good 
Standard 7 – Transitions from Custody into the Community Generally acceptable
QI 7.1 Generally acceptable
QI 7.2 Satisfactory
QI 7.3 Satisfactory
QI 7.4 Generally acceptable
QI 7.5 Generally acceptable 
Standard 8 – Organisational Effectiveness Generally acceptable
QI 8.1 Poor
QI 8.2 Satisfactory
QI 8.3 Satisfactory
QI 8.4 Generally acceptable
QI 8.5 Generally acceptable
QI 8.6 Generally acceptable
QI 8.7 Satisfactory
QI 8.8 Satisfactory 
Standard 9 – Health and Wellbeing Poor
QI 9.1 Generally acceptable
QI 9.2 Generally acceptable
QI 9.3 Generally acceptable

Page 264

125 
QI 9.4 Satisfactory
QI 9.5 Satisfactory
QI 9.6 Poor
QI 9.7 Satisfactory
QI 9.8 Poor
QI 9.9 Generally acceptable
QI 9.10 N/A
QI 9.11 Generally acceptable
QI 9.12 Satisfactory
QI 9.13 Poor
QI 9.14 Poor
QI 9.15 Satisfactory
QI 9.16 Poor
QI 9.17 Generally acceptable

Page 265

126 
Annex D 
Prison Population Profile on [ADD DATE]

Page 266

127 
Annex E 
Inspection Team 
Wendy Sinclair-Gieben, HMIPS
Stephen Sandham, HMIPS
Calum McCarthy, HMIPS
Kerry Love, HMIPS
Sam Gluckstein, HMIPS
Billy Menzies, Serco
Paul Durning, SPS
John Shanks, Scottish Prison Service
Margaret Rose Livingstone, Education Scotland
Ann Kivlin, Education Scotland
Sheila Brown, Education Scotland
Neil Gentleman, Care Inspectorate
James Black, Care Inspectorate
Catherine Haley, HIS
Lindsay Macphee, HIS
Jamie Thomson, HIS
Sophie Moss, HIS

Page 267

128 
Annex F 
Acronyms used in this Report 
ABS Anti-Bullying Strategy
ACP Anticipatory Care Plan
AHSU Adult Health Services Unit
BBV Blood Borne Virus
BICS British Institute of Cleaning Science
BSL British sign language
CAST Custody Adjustment Support and Transition
CBSW Community Based Social Workers
CIP Community Integration Plan
CMHT Community Mental Health Team
C&R Control and Restraint
CCTV Closed Circuit Television
COPFS Crown Office and Procurator Fiscal Service
COVID-19 Corona Virus Disease 2019
CPA Care Programme Approach
CPR Cardiopulmonary resuscitation
CPT European Committee for the Prevention of Torture and Inhuman
or Degrading Treatment or Punishment
DATIX NHS electronic incident reporting system
DNACPR Do not attempt cardiopulmonary resuscitation
ECR Electronic Control Room
ECHR European Convention of Human Rights
E&D Equality and Diversity
EDF Equality and Diversity Form
ESOL English to Speakers of Other Languages
FCO Family Contact Officer
FLM First Line Manager
GBTS Getting Better Together Shotts
GIC Governor in Charge
GPAs General Programme Assessments
H&S Health and Safety

Page 268

129 
HIS Healthcare Improvement Scotland
HMCIPS Her Majesty’s Chief Inspector of Prisons for Scotland
HMIPS Her Majesty’s Inspectorate of Prisons for Scotland
HMP Her Majesty’s Prison
HQ Headquarters
HSCP Health and Social Care Partnership
ICC Internal Complaints Committee
ICM Integrated Case Management
IMU Intelligence Management Unit
IPM Independent Prison Monitor
LCM Learning Centre Manager
LIM Local Incident Management
LS/CMI Level of Service/Case Management Inventory
LTPs Long Term Prisoners
MAPPA Multi-Agency Public Protection Arrangements
MDT Multi-Disciplinary Team
MHT Mental Health Team
MORS Management of an Offender at Risk from Any Substance
NIC National Induction Centre
NIP National Induction Presentation
NIPCM National Infection Prevention and Control Manual
NMC Nursing Midwifery Council
NOC Notification of Concern
NPM National Preventive Mechanism
NTE National Top End
OPCAT UN Convention against Torture and other Cruel, Inhuman or
Degrading Treatment or Punishment
OLR Order of Lifelong Restriction
OST Opiate Substitution Therapy
PAG Prescribing Advisory Group
PANEL Participation, Accountability, Non Discrimination and Equality,
Empowerment, Legality
PBSW Prison Based Social Work
PCF Prisoner Complaint Form

Page 269

130 
PCF1 Prisoner Complaint Form 1
PCF2 Prisoner Complaint Form 2
PCMB Programme Case Management Board
PEI Physical Education Instructor
PEEP Personal Emergency Evacuation Plans
PER Prisoner Escort Record
PIAC Prisoner Information Action Committee
PIC Prisoner Information Channel
PMAG Prison Monitoring and Assurance Group
POs Personal Officers
PPE Personal Protective Equipment
PPT Personal Protection Training
PR2 SPS Prison Records System (version 2)
PRL Prison Resource Library
PTI Personal Training Instructor
RAG Red, Amber, Green
RGNs Registered General Nurses
RMN Registered Mental Health Nurse
RMT Risk Management Team
RRA Reception Risk Assessment
SBAR Situation Background Assessment Recommendation
SBR Suspected Bullying Report
SEB Shotts Employability Board
SICP Standard infection control precaution
SMT Senior Management Team
SOP Standard Operating Procedure
SPICT Supportive and Palliative Care Indicators Tool
SPS Scottish Prison Service
SPSO Scottish Public Service Ombudsman
SRU Separation and Reintegration Unit
SSM Special Security Measure
SSOW Safe Systems of Work
TTCG Tactical Tasking and Co-Ordination Group
TTM Talk To Me

Page 270

131 
UOF Use of Force
VIR Violent Incident Review
VRG Violence Reduction Group

Page 271

Total Recommendations ‐ 22
Total Open Actions ‐ 16
Priority Open Actions – 6
Closed Actions – 6
Appendix 1‐ HIS Review Recommendations Update 17th May 2023
HIS Priority Actions RAG Update
Recommendation 44: 
North Lanarkshire HSCP and the
SPS should work jointly to ensure
that transfer arrangements for
incoming prisoners are such that
they enable a nurse to review/TTM
assess all prisoners before they are
admitted to a prison 
A
Discussions have taken place with SPS Senior Management on site with an agreement where possible to
arrange transfers of prisoners into the establishment prior to the completion of healthcare staff shifts. This is
being monitored, and any deviation (i.e. where a prisoner arrives after healthcare staff have finished) will be
managed as agreed with the Governor in Charge (GIC). Prisoner assessed by SPS staff and placed on
observation until Healthcare staff can assess.
Clinical Manager/Team Lead will continuously review compliance with requirement for admissions
Healthcare screening, and any deviation will be escalated via the Datix system and highlighted on safety
brief, with immediate action to assess prisoner as soon as is possible CNM review current process for
admissions to ensure this is completed for all prisoners on transfer into to HMP Shotts. Data Collection
started 1st May – daily number of transfers/time of transfer/daily number assessed by Primary Care Team
(PCT) /daily number not assessed on the day. 
NB: There have been no prisoner transfers since 1st May 2023
Recommendation 48:
North Lanarkshire HSCP must
revise without delay, the process in
place when identifying long term
health conditions and provide
assurance that patients are
reviewed in line with what is
equitable in the community to
address health inequalities 
A
Team Meeting held to discuss staff development and responsibility for chronic disease management. CNM
delegated with assigning specialist areas to staff and researching training opportunities. Review current
process to identify long term conditions for all prisoners on admission to the prison as well as any changes in
their condition that may develop. Process to be devised to ensure prisoners with long term conditions are
reviewed in line with community guidance and this is clearly documented within patients notes. All prisoners
with a long term condition will have a person centred care plan and appropriate risk assessment    
completed. These should be reviewed and updated regularly.

Page 272

Recommendation 52:
North Lanarkshire HSCP as a
matter of urgency must review the
medical cover available in the
afternoons to:
(i) ensure the risk to patients is
reduced
(ii) support nursing staff in
dealing with emergency
situations 
A
The mechanism in place (staff contact the Flow Navigation Centre in afternoon hours with concerns about
patients) was reviewed, updated and re‐circulated to staff following the inspection. Consultant connect is
available as an integral part of this but has seldom been used or required. The Local Enhanced Service (LES)
specification has been developed with invitations to tender being sent to all GPs in NHSL. 1 practice
responded and met with the General Manager, Associate Medical Director and Clinical Director. 1 GP is
currently shadowing for greater contextual understanding of the role. Associate Medical Director, Clinical
Director and General Manager are also working on a contingency if this option does not result in an
approved LES.
Recommendation 57:
As a priority North Lanarkshire’s
HSCP must action the
recommendations made in their
service review regarding pharmacy
provision and support to provide a
service equitable with the
community. 
A
Prescribing processes and checks have been reviewed and checks are made regularly for accuracy and safe
prescribing. Review of Pharmacy admin staff roles will form part of a wider workforce review. The existing
staff who work in the pharmacy roles are supported by a senior Pharmacy Advisor from NHS Lanarkshire
who visits regularly and is integrated into appropriate forums etc. in the delivery of service. The National
Pharmacy Contract also provided senior pharmacist support on a weekly basis in the form of a site based
day. The implementation of the new national pharmacy contract has been agreed. Lloyds will cease their
contract on 30th June 2023. MD Green have been awarded the new contract. Weekly national meetings
are in place to project plan the changeover. ECOR is being progressed to recruit to pharmacy vacancy.
Recommendation 61: NHS
Lanarkshire HSCP and SPS must
ensure complaints forms are
available in alternative formats
and languages to ensure all
patients can provide feedback,
raise concerns and complain 
G
The 12 most utilised languages complaint forms have been developed. Discussions to take place with SPS
Head of Offender Outcomes to ascertain and agree the process for implementing these to prisoners as and
when required. Meeting arranged 17th May 2023.
Recommendation 65: North
Lanarkshire HSCP must demonstrate
implementation of recommendations
from service review and provide clear
pathways to support staff on site in
HMP Shotts in the absence of senior
staff 
A
There has been prolific senior management presence onsite since November 2022. Recruitment of the CNM
for PCT has been successful with a start date of 3rd July. Senior management support continues to be
provided until the CNM starts. The Improvement Manager has been in post since the 3rd April, is onsite  
most days and has well integrated links to the senior management team.

Page 273

HIS Non Priority Actions RAG Update
Recommendation 46: 
National co‐ordination and
discussion with partner agencies
(such as Police Scotland, Scottish
Courts, GEOAmey and SPS) is
required to ensure that people
arrive at prison during the prisons
core opening times or when
nursing resource is available 
A
Discussion has taken place with SPS Senior Management on site, with an agreement where possible to
arrange transfers of prisoners into the establishment prior to the completion of healthcare staff shifts. This
is being monitored, and any deviation (i.e. where a prisoner arrives after healthcare staff have finished) will
be managed as agreed with the GIC ‐ Prisoner assessed by SPS staff and placed on observation until
Healthcare staff can assess. CNM will continuously review compliance with requirement for admissions
Healthcare screening and any deviation will be escalated via the Datix system and highlighted on safety
brief, with immediate action to assess the prisoner as soon as is possible. Compliance monitoring and data
collection has begun since 1st May now the IM has started post however there have been no prisoner
transfers since 1st May 2023 due to issues with GEOAmey
Recommendation 56: 
North Lanarkshire HSCP must
ensure that person centred care
plans and appropriate risk
assessments are in place for all
patients with long term conditions
(LTC) and that these are reviewed
regularly 
A
A structure to identify and review patients with LTC has been developed and thereafter medical reviews will
occur as result of this structure with a recall system in place on VISION. Frequency of reviews will be decided
by medical staff based on need and any relevant guidelines. When staffing allows; allocation of
responsibility for chronic disease management will be conducted based on individual staff member’s skills,
experiences and development needs. Senior Nurse will via staff PDP identify these responsibilities and
assess issues such as training opportunities required

Page 274

HIS Non Priority Actions RAG Update
Recommendation 45:
North Lanarkshire HSCP must
develop a pathway to ensure
patients receive psychiatry follow
up when transferred, 
G
Link with the head/lead forensic psychiatrists Scottish Prisons and Community at all health boards to devise
a simple pathway to share that says a transfer letter from previous prison must be sent to SHOTTS pre
admission to allow appropriate follow up appointment to be booked with psychiatrist. To mitigate in the
short term, the mental health secretary will check vison/docman for every new prisoner transfer to ascertain
if psychiatry follow‐up is required for them. If it is the patient will be booked to our psychiatrist as per
instructions of their last psychiatric letter.
Recommendation 54:
North Lanarkshire HSCP must
introduce an electronic system to
record and update documents to
keep documents live and ensure
the most up‐to‐date information is
accessible. 
A
On an ongoing basis, there will be scoping of whether North HSCP can introduce an electronic system to
record and update documents to keep documents live and ensure the most up to date information is
accessible. Discussion has been ongoing regarding the potential introduction of the MORSE system 
At present a national, (and older) version of Vision is the main system in use across all HMPs in Scotland
Recommendation 55:
North Lanarkshire HSCP must
develop a pathway for accessing
specialist support in intellectual
disabilities, autistic spectrum
disorder, neuropsychiatric
disorders and cognitive
impairment. 
A
The service has no bespoke internal functionality for these disorders based at the prison, but any individual
with such presenting needs would be referred to the existing Lanarkshire services. This entails prisoner
patients having to wait an equitable period of time as the general public for assessment and any
interventions that such a referral may produce. Newly established ‘Lanarkshire’ pathways are in situ for
ADHD and Cognitive Impairment. 
There has been change in personnel in relation to the Senior Nursing position for Mental Health & LD. New
staff are establishing themselves now and will support with the further development of access for prisoner
patients to appropriate services.
Recommendation 58: 
NHS Lanarkshire's pharmacy
service must provide structured
and regular support to staff
involved in supporting pharmacy
services within HMP Shotts 
A
Review of Pharmacy admin staff roles will form part of a wider workforce review when the newly appointed
Project/Improvement Manager is in post. However, the existing staff who work in the pharmacy roles are
supported by a senior Pharmacy Advisor from NHS Lanarkshire who visits regularly and is integrated into
appropriate forums etc. in the delivery of service. 
The implementation of the new national pharmacy contract has been agreed. Lloyds will cease their
contract on 30th June 2023. MD Green have been awarded the new contract. Weekly national meetings
are in place to project plan the changeover. ECOR is being progressed to recruit to pharmacy vacancy.

Page 275

HIS Non Priority Actions RAG Update
Recommendation 59:
North Lanarkshire HSCP and SPS
must seek solutions to assist staff
to administer medication at a
suitable and therapeutic time 
A
Existing practices are made as safe as possible (SOP’s in place) by working in conjunction with SPS.
Development is planned between both organisations to change the administration of “Weekly” medication
as and when healthcare staffing enables this.
Recommendation 50:
North Lanarkshire HSCP must
ensure that all eligible patients
who wish to be involved in
national screening programmes
are supported to do so and that
this is clearly documented in
patients VISION record 
A
The service will ensure on an ongoing basis that prisoners are able to be included in national screening
programmes for Bowel cancer and AAA (If in the appropriate age groups). Currently prisoners receive their
own screening appointment letters directly (not via healthcare department). This is reliant on their
whereabouts being known. A National solution is required for this and NHS Lanarkshire will keenly
participate. If this process is required to be evidenced/audited, a system must be developed to ensure that
all appropriate patients have accessed screening by direct correspondence and that this is documented on
Vision. This will require prisoners to share these details.
Recommendation 53:
North Lanarkshire HSCP must
ensure that patients are able to
access national screening
programmes in line with
community provision and keep
accurate records of attendance 
A
As above
Recommendation 60:
NHS Lanarkshire HSCP should
consider the re‐introduction of the
oral health educator role to
support the dental service 
G
Oral health care team are updating PPT training with SPS on 22nd February 23 and will commence monthly
education visits once training completed in March. Service lead anticipates more frequent visits in future
plans. IM is meeting senior health improvement manager 17th May to discuss position and move forward

Page 276

HIS Closed Actions RAG Update
Recommendation 47: HMP Shotts
must provide a room that is clean
and clutter‐free at reception 
G
Interview/Assessment room in Reception area has been reviewed, has been cleared, is regularly cleaned and
is now fit for purpose.
Recommendation 49: North
Lanarkshire HSCP must implement
a system for secondary care
referrals that ensures patient
confidentiality is protected 
G
Immediately after the inspection a solution was found with use of secure e mail over surface mail as SCI
Gateway option was still being explored. SCI gateway infrastructure is now in place and went live on 11th
May 2023.
Recommendation 51: North
Lanarkshire HSCP must ensure that
checks on emergency equipment
are carried out within the agreed
timeframe and that these checks
are clearly recorded. 
G
Emergency equipment is checked regularly and documentation is signed to evidence this by healthcare staff.
CNM will complete random audits of documentation to ensure compliance.
Recommendation 62: NHS
Lanarkshire HSCP must ensure that
all staff managing complaints
receive training to ensure that all
complaints are correctly managed. 
G
The senior management team have reviewed all processes which now ensures the CNM onsite manages all
Stage 1 complaints. Full training has been issued.  Anything Stage 2 and above is escalated and managed via
the organisational process (Patient Affairs & General Manager).
Recommendation 63: NHS
Lanarkshire HSCP should develop a
process to discuss complaints to
share learning and identify any
themes or required
improvements. 
G
CNM has reintroduce monthly team meetings. CNM to chair with attendance from SM/SN to provide
additional info and communication from strategy group and operational issues. Standing Agenda items are
agreed with opportunity to add additional items. Items to include Infection Prevention & Control, Briefing
Notes, Datix's, Actions Plans & shared Learnings. Discussion, Action points and updates to be recorded in R
Drive.
Recommendation 64: NHS
Lanarkshire HSCP must ensure that
alternative and consistent IT  G
Immediately after the inspection a solution was found with use of secure e mail over surface mail as SCI
Gateway option was still being explored. SCI gateway infrastructure is now in place and went live on 11th
May 2023.

Page 277

solutions are provided to support
clinical staff as referrals by post is
a significant data breach

Page 278

Total Recommendations ‐ 32
Total Open Actions – 10
Total Closed Actions ‐ 22
Appendix 2 ‐Service Model Review Update 17th May 2023
Service Model Review Actions RAG Update
Recruitment and retention of staff 
A
Ongoing Open Day's planned 6‐8 monthly with SPS. Held on 2 occasions (Oct 2022 & Feb 2023). Shadow shift
project to engage with Lanarkshire Staffbank staff and promote experience in Shotts and allow for training of
temporary staff. Rolling adverts for Primary Care staff via national SHOW vacancy website. Attendance by
Practice Education Facilitators to Open Day and regular communication to facilitate Student/Mentorship in
prison setting once vacancy backfill allows for clinical supervision of students. Recruitment is on‐going.
Application made to STAC for Secure Environment Allowance for staff. Awaiting decision.
Clearly define roles and
responsibilities for each grade of
staff and identify development
opportunities 
A
Newly appointed seconded Team Leader/Clinical Nurse Manager (CNM) in post April 23 ‐ gaining access to
systems presently. 2nd CNM appointed with a start date of July 23.
Develop monthly service
development meetings with the
MDT  G
Improvement manager will set up monthly improvement group meetings with the senior team and teams
within the HC. The first meeting is set for 24th May within the HC. A staff experience questionnaire has been
sent to all staff for completion. Results will be presented at the meeting.
Student Feedback 
A
Practice Education Facilitator for Shotts has changed early 2023 and we are engaged with team to facilitate
training for current and future Primary Care team staff to bring suitable students into the learning
environment. Currently we need more registrants in the team to support student plans.
Completion of Mandatory and
Compulsory Training for all staff  G
Rolling programme of training and education affected by turnover of staff and current vacancy level. All staff
aware of personal responsibility for skill and training requirement. Seconded CNM gaining access to TURAS
and EESS platforms. Skills Bus has been delayed from Nov/Dec 2022 however team has been contacted again
to provide dates.

Page 279

Develop an electronic staffing
roster on MS Teams  G
All staff will have visibility to this for transparency, any amendments made are audited allowing staff to
trace/track all changes. Await the new PCT CNM to commence post in July then discuss and agree on the
roster format.
Review of addictions pathway for
released prisoners  G
Addictions Charge Nurse invited to share current pathway with Drug Death Task Forum. This group is due to
meet on 23rd July 2023
Water outlet not been utilised 
G
Outlets have been removed and room is ready for preparation to store room facility. Seconded CNM is
reviewing requirements to push work forward.
Patient Feedback 
A
Health Improvement advisor based at prison has confirmed the restart of Satisfaction Questionnaires from
April 2023. Dates for focus groups yet to be confirmed. Health Improvement advisor left post in April ‐ eCOR
to be raised to backfill and continue this work.
Training in relation to End of Life
Care  G
Anticipatory Care Planning (ACP) training/refresher for staff to be arranged •Staff to complete Lanarkshire
ACP training module on learn pro. Confirmation of death training to be arranged for all appropriate staff.
Clinic team to develop a pack containing appropriate and relevant resources that can be shared with
bereaved families.

Page 280

Service Model Review Closed
Actions
RAG Update
Robust process for monthly NMC
Registration checks for Registered
nurse to be established  G
Robust monthly process implemented by Senior Nurse, and undertaken by CNM as routine monthly task.
Proactive approach to reminding staff that Registration fees are due for renewal. Proactive approach to
ensure staff undertake Revalidation exercise timeously and in advance of due date for sign off.
Introduction of Daily Safety Brief 
G
Template for safety brief updated, agreed and implemented. Morning safety brief being completed by
Primary Care Team at beginning of shift and electronic copy saved in R‐drive. Introduction of 2pm verbal
briefing started 8th May 2023 by CNM, includes MDT representation.6pm Safety handover completed by PCT
Nurse on duty at end of working day. Emailed to colleagues and Senior management team for info
Introduction of a Monthly Health
Centre Team/Service meeting
G CNM re‐commenced these meetings in April 2023
Staff Health & Well Being 
G
Discussion with SPS staff at Strategy group ‐ unable to provide alternative rest area but staff can utilise
facilities at main reception for breaks, this also includes use of Gym facilities. Staff breaks extended to
include time to walk to main reception if staff wish to utilise this area. Weekly staff email bulletin includes
up to date information for all staff re how to access staff health and wellbeing facilities.
Radio chatter distraction to staff 
G
Discussed at Strategy Group, and agreed clinical staff should remove ear piece when issuing medication.
Communicated this to staff.
Health & Safety 
G
Control Book reviewed end of November 22 with Action Plan issued. CNMs tasked with completion and/or
delegation of tasks. Control book reviewed and on continuous review and update as risk assessments are
required.
Psychological Safety G iMatters survey due reviewed July 2023 as annual plan. Psychological survey carried out with staff for
anonymous feedback ‐ will be repeated at regular intervals in the calendar year.
Develop guidelines in relation to
SPS purchased social care services 
G
Senior professional & operational management have raised concerns to SPS at joint NHSL/SPS strategy
forum. SPS did not share concerns expressed, but agreed to further investigate individual episode of alleged
suboptimal care. NHSL will continue to raise concerns if required using appropriate medium. Individual
investigation was investigated and concluded to NHSL satisfaction.

Page 281

Competent witness training G Register of all staff completing Competent witness training now being completed and CNM responsible for
ensuring this is kept up to date. PDD to be contacted by SN to request review of training pack. Discussion
completed with Practice Development.
Review of kardex's G Process in place with regular review and re writing of medication kardex (Prescription sheet).
Missing kardex’s within pharmacy 
G
Test of changed developed and instated by way of sign in and out tracer card within pharmacy to reduce
time wasted searching for kardexes when they are not in their allocated folder or with the GP.
Completion of hand Hygiene learn
pro module annually by all staff  G
Learn pro hand hygiene module records are held in this database and are being updated by CNM monthly.
CNM is completing 10 hand hygiene audits each month with team and submitting on Monthly Highlight
report for North hygiene group. Request to CNM for all completed audits to be recorded monthly on LanQIP
‐now completed onto LanQIP system
Ensure all staff are fully aware of
appropriate use of Personal
Protective Equipment (PPE) 
G
Winter Respiratory guidance and posters shared with CNM by SN. Request to share with team as well as
posters to be displayed in all clinical areas. SN re‐shared Winter Respiratory guidance with all staff, including
Respiratory questions and Quick Reference pathway which fully outlines appropriate use of PPE. 
Above guidance now added to admissions paperwork and staff now complete the questionnaire for all
prisoners transferred into HMP Shotts during the admission process 
Prompt added to Daily Safety Brief as well as discussion at Morning safety handover to ensure all staff were
fully aware of update. SN ensured posters were visible in relation to this guidance in health centre area for
staff reference
Ensure all staff fully aware of local
guidance re cleaning and
decontamination of environment
and equipment 
G
A‐Z Decontamination checklist shared by Senior Nurse (SN) to CNM and request for this to be completed as
applicable. SN shared laminated posters with staff with instructions on use of appropriate cleaning agents‐
request for these to be displayed in Health centre area for staff reference.
Cleaning schedules are available in all clinical rooms and staff are aware re completion of these at end of
each room use.

Page 282

Completion of monthly SICP's
audits as per SICPs Monitoring
Audit Programme 
G
Monthly SICP'S audits are completed by CNM, reported and submitted on Highlight report for collation by
SN. SN shared annual SICP'S Monitoring audit programme with CNM. Request to CNM that all SICP'S audits
are recorded on LanQIP when complete‐ this is now being actioned. 
Scottish Infection Control Education Pathway added to staff learn pro training scorecards for completion by
all appropriate staff and record of completion will then be available for CNM to review. CNM will ensure staff
complete.
Poor compliance by all patients
with PPE guidance and physical
distancing 
G
This advice continues to be reinforced for all patients attending Health centre area.
Ensure all staff fully aware of
national and local guidance in
relation to infection prevention
and control 
G
Winter Respiratory guidance and posters shared with CNM by SN, Request to share with team as well as
posters to be displayed in all clinical areas. 
SN re‐shared Winter Respiratory guidance with all staff. This included Respiratory questions and Quick
Reference pathway which fully outlines appropriate use of PPE 
SN shared IPC team contact details as well as email link to IPC guidance for staff use by email as well as
laminated posters displayed in health centre area for staff reference when required.
Ensure all sharps bins are
temporarily closed 
G
CNM has discussed this with staff and is ensuring all staff are fully aware of how to temporarily close Sharps
bins and correct labelling of bins. 
SN shared appropriate signage re Temporary closure of sharps bins with staff and request to display these in
all appropriate clinical areas where sharps bins are used.

Page 283

Cancellation of patient transport   
G
Database is being completed and updated daily to record any Geo‐amey cancellations. CNM is ensuring all
cancelled appointments are reviewed daily to prioritise need for re‐appointment for individual prisoners. All
cancellations appointments are reviewed by clinical staff and prioritised when requesting re‐appointments.
Review of joint NHS Scotland and
SPS MORS Policy   
G
Discussed at local strategic meeting with SPS Staff and agreement that SPS staff should always action request
from NHS staff to commence MORS Policy. NHS staff should escalate to Governor/Deputy Governor if any 
SPS staff refuse to commence MORS policy when requested.  National review of MORs policy on‐going. SPS
and Healthcare work in collaboration to review safety of patients.
Ongoing national discussions regarding MORS. 
Appropriate use of ACP 
G
SN shared updated copy of ACP booklet as well as the ACP Guidance for Health Professionals. CNM to share
and discuss appropriate use of this with team. Staff to consider use of ACP booklet when indicated for
individual patient completion.
Review current escalation process
for deteriorating patients 
G
Training completed in 2022 for staff however change of staff will mean more training later this year. Closing
as this will be a rolling programme of education.

Page 284

1
REPORT
Item No: 11
SUBJECT: North Lanarkshire ADP – Self-Assessment
TO: Performance, Finance & Audit Committee
Lead
Officer for
Report:
Morag Dendy Head of Planning, Performance and Quality
Assurance
Author(s) of
Report
John Holleran – Strategic Lead, North Lanarkshire ADP
DATE: 21 June 2023
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
For approval ☒ For endorsement ☐ To note ☐
2. ROUTE TO THE BOARD
This paper has been:
Prepared By: ☒ Reviewed By: ☒ Endorsed By: ☐

Page 285

2 
3. RECOMMENDATIONS 
3.1 The IJB is asked to:
(1) Note the content of the report;
(2) Note the content of the Annual Reporting Survey to the Scottish Government
that requires approval by the IJB. This is due to be submitted via the ADP by 27th
June 2023. The survey is designed to collect information on a range of aspects
relating to the delivery of the Nation Mission, to deliver on the priorities in line with
additional investment;
(3) Note the arrangements in place across each priority area;
 Prevention, Early Intervention and Education
 Residential Rehab
 Assertive Outreach and Crisis support
 Harm reduction – including Naloxone provision
 Whole Family Approach and Family Inclusive Practice
 Lived and Living Experience 
(4) Approve NLADP Annual report completion setting out the appropriate
supports and governance is in place to deliver the National Mission priorities and
The Partnership Delivery Framework objectives. 
4. VARIATIONS TO DIRECTIONS? 
Yes ☐ No ☐ N/A ☒ 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 The NLADP Strategic Lead has been working closely with key partners through
the five ADP sub-groups (below) to develop key actions and support in
keeping with national evidence, regional scoping work and learning from
commissioned services including the voices of lived experience. The ADP
sub-groups oversee and support decision making on local investments linked
to delivering on the National Mission priorities. 
1. Prevention, Early Intervention, & Education
2. Treatment, Care & Recovery
3. Whole Family Approach
4. Public Health Approach to Justice
5. Reducing Alcohol Harms Group

Page 286

3 
5.2 All thirty of Scotland ADPs are responsible for delivering on the National Mission
Priorities. The aim of the National Mission is to improve and save the lives of people
who use drugs and their loved ones.
The purpose of the Annual Report Survey to give local ADPs a tool to engage
and discuss opportunities and barriers to delivery.
Strategic Planning follows a cycle of
 Assessing need
 Aligning resources
 Agreeing delivery plans and priorities
 Reporting and learning from outcomes
5.3 Annual Report Survey is designed to ensure key measures are in place and
that the local system is supporting the work of the ADP. The Annual Report Survey
should be agreed and signed off with the relevant Chief Officers and stakeholders
5.4 The Annual report survey sets out where the local ADP and relevant partners
are in relation to the Partnership Delivery Framework:
1. Strategic planning
2. Financial arrangements
3. Quality improvement and Outcomes
4. Governance and Oversight
5. The relationship between the ADP and the Integration Authority 
6. CONCLUSIONS
6.1 The Annual report survey sets out the range of work in place to scope strengths
and challenges in current arrangements. NLADP place the experience of
people with lived experience and families at the centre of developments and
engagement with all stakeholders. This approach has significantly reshaped
the commissioning intentions, created a robust response to the challenge of
preventable drug deaths in North Lanarkshire and informed the ADP
Investment Plans. 
6.2 A detailed report with full commissioned services activity, governance processes
and financial arrangements will follow at the next meeting. This will reflect
progress made in 2022/23 towards the associated measures set out below. 
7. IMPLICATIONS

Page 287

4 
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services
☒
Health and Social Care Services contribute to reducing health inequalities ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services
☒
7.2 ASSOCIATED MEASURE(S) 
• Medication Assisted Treatment (MAT) standards – 1-5 implemented and
embedded by March 2024 (6-10 beyond) 
• Residential rehab – assessment and access for anyone who chooses/where
appropriate as part of their care and treatment. Each ADP/Health Board
should now publish rehab pathways online setting out how people can access
residential rehab. 
• Harm reduction – consistent approaches and increase workforce
confidence/capacity to deliver HR. Includes Naloxone provision, Blood-Bourne
Virus testing and wound care.
• Assertive Outreach – ADPs should define their approach for increased
support with commissioning for effective assertive outreach/crisis support.
• Treatment Targets – increase engagement by 9% (113) by 2024
• Whole Family Approach – increase/widen Family Inclusive Practice (FIP)
across all treatment and care settings
• Recovery – Lived and Living Experience (LLE) involved in design, delivery
and evaluation of services. LLE Panels to be established.
• Mental Health – Complex needs are fully considered and met via trauma
informed workforce
• Stigma – tackled at local level

Page 288

5 
• Human Rights – are at the heart of how substance use services and wider
supports are designed and offered. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes ☐ No ☐ N/A ☒ 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details
Current Risk Level Risk Owner 
Choose an item. 
7.5 ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken. 
Objectives Further Details
☒ Involve stakeholders in the development
work aimed at achieving the national
outcomes 
□ Provide stakeholders with information on
how to get involved 
□ Ensure a diverse range of engagement
and participation and opportunities are in
place to suit different needs 
☒ Measure how well we involve community
stakeholders in the planning, design
and delivery of our services 
☒ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery 
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings

Page 289

6 
□ Develop participation guidelines to
ensure a common understanding and set of
expectations for both stakeholders and
partnership staff 
□ Support engagement planning and
participation in localities, taking account of
other engagement activity and local plans
across the Community Planning
Partnership 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes ☐ No ☐ N/A ☒ 
EQIA added to website: 
Yes /
Date
added
☐ No ☐ N/A ☒ 
8. BACKGROUND PAPERS
This report sets out the progress made by North Lanarkshire ADP on delivering on
Rights, respect recovery, the national performance framework, National mission
objectives linked to reducing harm from alcohol and drugs.
This report forms the basis of the annual return to the Scottish Government setting
out progress made from investments in 2022.

Page 290

7 
9. APPENDICES
Please include a glossary of terms if not already included. 
Appendix 1 ADP Annual Reporting Survey 2022-23 
CHIEF ACCOUNTABLE OFFICER (or Depute) 
Members seeking further information about any aspect of this report, please contact
the following; John Holleran on 01698 753651 john.holleran@lanarkshire.scot.nhs.uk

Page 291

8 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number 
2 Report Title 
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed

Page 292

1 
Appendix 1 
Alcohol and Drug Partnership (ADP) Annual Reporting Survey: 2022/23 
This survey is designed to collect information from all ADPs across Scotland on a range of
aspects relating to the delivery of the National Mission during the financial year 2022/23.
This will not reflect the totality of your work but will cover those areas where you do not
already report progress nationally through other means. 
The survey is primarily composed of single option and multiple‐choice questions, but we want
to emphasise that the options provided are for ease of completion and it is not expected that
every ADP will have all of these in place. We have also included open text questions where
you can share more detail. 
We do not expect you to go out to services in order to respond to questions relating to
activities undertaken by them in your area. Where questions refer to service level activities,
we are interested in the extent to which you are aware of these at an ADP level. 
We are aware of some element of duplication with regards to questions relating to MAT
Standards and services for children and young people. To mitigate this, we’ve reviewed the
relevant questions in this survey and determined the ones that absolutely need to be included
in order to evidence progress against the national mission in the long‐term. While some of
the data we are now asking for may appear to have been supplied through other means, this
was not in a form that allows for consistently tracking change over time. 
The data collected will be used to better understand the challenges and opportunities at the
local level and the findings will be used to help inform the following:
 The monitoring of the National Mission;
 The work of a number of national groups including the Whole Family Approach Group,
the Public Health Surveillance Group and the Residential Rehabilitation Working
Group, amongst others; and
 The priority areas of work for national organisations which support local delivery. 
The data will be analysed and findings will be published at an aggregate level as Official
Statistics on the Scottish Government website. All data will be shared with Public Health
Scotland to inform drug and alcohol policy monitoring and evaluation, and excerpts and/or
summary data may be used in published reports. It should also be noted that the data
provided will be available on request under freedom of information regulations and so we
would encourage you to publish your return. 
The deadline for returns is Tuesday 27th June 2023. Your submission should be signed off by
the ADP and the IJB, with confirmation of this required at the end of the questionnaire. We
are aware that there is variation in the timings of IJB meetings so please let us know if this
will be an issue. 
If you require clarification on any areas of the survey or would like any more information,
please do not hesitate to get in touch by email at substanceuseanalyticalteam@gov.scot.

Page 293

2 
Cross‐cutting priority: Surveillance and Data Informed
Q1) Which Alcohol and Drug Partnership (ADP) do you represent?
[single option, drop‐down menu] 
North Lanarkshire ADP 
Q2) Which groups or structures were in place at an ADP level to inform surveillance and
monitoring of alcohol and drug harms or deaths? (select all that apply)
[multiple choice]
☒ Alcohol harms group
□ Alcohol death audits (work being supported by AFS)
☒ Drug death review group
☒ Drug trend monitoring group/Early Warning System
□ None
□ Other (please specify): 
Q3a) Do Chief Officers for Public Protection receive feedback from drug death reviews?
(select only one)
[single option]
☒ Yes
□ No
□ Don’t know 
Q3b) If no, please provide details on why this is not the case.
[open text – maximum 255 characters] 
Q4a) As part of the structures in place for the monitoring and surveillance of alcohol and
drugs harms or deaths, are there local processes to record lessons learnt and how these are
implemented? (select only one)
[single option]
☒ Yes
□ No
□ Don’t know 
Q4b) If no, please provide details.
[open text – maximum 255 characters]

Page 294

3 
Cross‐cutting priority: Resilient and Skilled Workforce
Q5a) What is the whole‐time equivalent staffing resource routinely dedicated to your ADP
Support Team as of 31st March 2023.
[open text, decimal] 
Total current staff (whole‐time equivalent
including fixed‐term and temporary staff,
and those shared with other business areas)
7.00
Total vacancies (whole‐time equivalent) 1 
Q5b) What type of roles/support (e.g. analytical support, project management support, etc.)
do you think your ADP support team might need locally? Please indicate on what basis this
support would be of benefit in terms of whole‐time equivalence.
[open text – maximum 255 characters]
Strategic Lead WTE
Development officer x3 WTE
Information Research Officer WTE
Administrator WTE
Clerical Officer WTE 
Q6a) Do you have access to data on alcohol and drug services workforce statistics in your
ADP area? (select only one)
[single option]
☒ Yes
□ No (please specify who does):
□ Don’t know 
6b) If yes, please provide the whole‐time equivalent staffing resource for alcohol and drug
services in your ADP area.
[open text, decimal] 
Total current staff (whole‐time equivalent) 50.00
Total vacancies (whole‐time equivalent) 10.5 
Q7) Which, if any, of the following activities are you aware of having been undertaken in
your ADP area to improve and support workforce wellbeing (volunteers as well as salaried
staff)? (select all that apply)
[multiple choice]
☒ Coaching, supervision or reflective practice groups with a focus on staff wellbeing
☒ Flexible working arrangements
☒ Management of caseload demands
☒ Provision of support and well‐being resources to staff
☒ Psychological support and wellbeing services
☒ Staff recognitions schemes

Page 295

4 
□ None
□ Other (please specify):

Page 296

5 
Cross cutting priorities: Lived and Living Experience
Q8a) Do you have a formal mechanism at an ADP level for gathering feedback from people
with lived/living experience using services you fund? (select all that apply)
[multiple choice]
☒ Feedback/complaints process
☒ Questionnaire/survey
□ No
☒ Other (please specify): Commisioned support from NCOs including Scottish Recovery
Consortium and Scottish Drug Forum. In addition, local comissioned services gather feedback
and report to the ADP on a 1/4ly basis. 
Q8b) How do you, as an ADP, use feedback received from people with lived/living
experience and family members to improve service provision? (select all that apply)
[multiple choice] 
Lived/living experience Family members
Feedback used to inform
service design ☒ ☒
Feedback used to inform
service improvement ☒ ☒
Feedback used in assessment
and appraisal processes for
staff 
☒ ☒
Feedback is presented at the
ADP board level ☒ ☒
Feedback is integrated into
strategy ☒ ☒
Other (please specify)   
Q9a) How are people with lived/living experience involved within the ADP structure?
(select all that apply)
[multiple choice] 
Planning (e.g.
prioritisation
and funding
decisions)
Implementation
(e.g.
commissioning
process, service
design)
Scrutiny (e.g.
monitoring
and evaluation
of services)
Other (please
specify)
Board representation at
ADP ☒ ☒ ☒ 
Focus group ☒ ☒ ☒ 
Lived experience
panel/forum ☐ ☐ ☐ In
development
Questionnaire/ surveys ☒ ☒ ☒ 
Other (please specify)

Page 297

6 
Q9b) How are family members involved within the ADP structure? (select all that apply)
[matrix, multiple choice] 
Planning (e.g.
prioritisation
and funding
decisions)
Implementation
(e.g.
commissioning
process, service
design)
Scrutiny (e.g.
monitoring
and evaluation
of services)
Other stage
(please specify)
Board representation at
ADP ☒ ☒ ☒ 
Focus group ☒ ☒ ☒ 
Lived experience
panel/forum ☐ ☐ ☐ In development
Questionnaire/ surveys ☒ ☒ ☒ 
Other (please specify)     
Q9c) If any of the above are in development for either people with lived/living experience
and/or family members, please provide details.
[open text – maximum 2000 characters]
The ADP is currently supported by Scottish Recovery Consortium and Scottish Drug Forum
to establish our lived experience representatives panels. These will be led/supported by a
dedicaed post within the ADP support team on a permanent basis. This is currently out to
advert. 
Q10) What monitoring mechanisms are in place to ensure that services you fund are
encouraged/supported to involve people with lived/living experience and/or family
members in the different stages of service delivery (i.e. planning, implementation and
scrutiny)?
[open text – maximum 2000 characters]
NLADP has a quarterly reporting process in place where all comissioned services are
requried to set out what involvement those with lived and living experiecne have had in
the design, delivery and evaluation of their services. 
Q11) Which of the following support is available to people with lived/living experience
and/or family members to reduce barriers to involvement? (select that apply)
[multiple choice]
☒ Advocacy
☒ Peer support
□ Provision of technology/materials
☒ Training and development opportunities
☒ Travel expenses/compensation
☒ Wellbeing support
□ None
□ Other (please specify):

Page 298

7 
Q12a) Which of the following volunteering and employment opportunities for people with
lived/living experience are offered by services in your area? (select all that apply)
[multiple choice]
☒ Community/recovery cafes
☒ Job skills support
☒ Naloxone distribution
☒ Peer support/mentoring
☒ Psychosocial counselling
□ None
□ Other (please specify): 
Q12b) What are the main barriers to providing volunteering and employment opportunities
to people with lived/living experience within your area?
[open text – maximum 2000 characters]
This fully supported via the dedicated commsioned service (Individual Placement Support).
This is currently delviered by SAMH across the whole of North Lanarkshire. 
Q13) Which organisations or groups are you working with to develop your approaches and
support your work on meaningful inclusion? (select all that apply)
[multiple choice]
☒ MAT Implementation Support Team (MIST)
☒ Scottish Drugs Forum (SDF)
☒ Scottish Families Affected by Drugs and Alcohol (SFAD)
☒ Scottish Recovery Consortium (SRC)
□ None
□ Other (please specify):

Page 299

8 
Cross cutting priorities: Stigma Reduction
Q14) Do you consider stigma reduction for people who use substances and/or their families
in any of your written strategies or policies (e.g. Service Improvement Plan)? (select only
one)
[single option]
☒ Yes (please specify which):
□ No
□ Don’t know 
Q15) Please describe what work is underway to reduce stigma for people who use
substance and/or their families in your ADP area.
[open text – maximum 2000 characters]
NLADP hosted a number of workshops this year with the support of Scotish Families
affected by Alcohol and Drugs and the Scottish Recovery Consortium. The next phase is to
establish local stigma steering group and a stigma action fund to support local atcitivies.
we also work closely with Stigma Free Lanarkshire and community sector partners to
shape our local reponse.

Page 300

9 
Fewer people develop problem substance use
Q16) How is information on local treatment and support services made available to
different audiences at an ADP level (not at a service level)? (select all that apply)
[multiple choice] 
Non‐native
English
speakers
(English
Second
Language)
People with
hearing
impairments
People with
learning
disabilities
and literacy
difficulties
People with
visual
impairments
Other
audience
(please
specify)
In person (e.g. at
events,
workshops, etc) 
☐ ☐  ☐  ☐ 
Leaflets/posters ☐ ☐ ☐ ☐ 
Online (e.g.
websites, social
media, apps, etc.) 
☐ ☐  ☐  ☐ 
Other (please
specify)

Page 301

10 
Q17) Which of the following education or prevention activities were funded or supported by
the ADP? (select all that apply)
[multiple choice] 
0‐4
(early
years)
5‐12
(primary)
13‐15
(secondary
S1‐4)
16‐24
(young
people)
25+
(adults)
Parents People
in
contact
with
the
justice
system
Other
audience
(please
specify)
Counselling
services ☐ ☒ ☒ ☒ ☐ ☒ ☐ 
Information
services ☐ ☒ ☒ ☒ ☒ ☒ ☒ 
Physical health ☐ ☒ ☒ ☒ ☒ ☐ ☐ 
Mental health ☐ ☒ ☒ ☒ ☒ ☒ ☒ 
Naloxone ☐ ☐ ☐ ☒ ☒ ☒ ☒ 
Overdose
awareness and
prevention 
☐ ☐  ☒  ☒  ☒  ☒  ☒ 
Parenting ☐ ☐ ☒ ☒ ☒ ☒ ☐ 
Peer‐led
interventions ☐ ☐ ☒ ☒ ☒ ☒ ☒ 
Personal and
social skills ☐ ☐ ☒ ☒ ☒ ☒ ☒ 
Planet Youth ☐ ☐ ☒ ☒ ☐ ☐ ☐ 
Pre‐
natal/pregnancy ☐ ☐ ☐ ☒ ☒ ☒ ☒ 
Reducing stigma ☐ ☐ ☒ ☒ ☒ ☒ ☒ 
Seasonal
campaigns ☐ ☐ ☐ ☒ ☒ ☒ ☒ 
Sexual health ☐ ☐ ☒ ☒ ☐ ☐ ☐ 
Teaching
materials for
schools 
☒ ☒  ☒  ☒  ☐  ☐  ☐ 
Wellbeing
services ☐ ☒ ☒ ☒ ☒ ☒ ☒ 
Youth activities
(e.g. sports, art) ☐ ☒ ☒ ☒ ☒ ☒ ☒ 
Youth worker
materials/training  ☐  ☒  ☒  ☒  ☒  ☒  ☒ 
Other (please
specify)

Page 302

11 
Risk is reduced for people who use substances
Q18a) In which of the following settings is naloxone supplied in your ADP area? (select all
that apply)
[multiple choice]
☒ Accident & Emergency departments
☒ Community pharmacies
☒ Drug services (NHS, third sector, council)
☒ Family support services
□ General practices
☒ Homelessness services
☒ Justice services
☒ Mental health services
☒ Mobile/outreach services
☒ Peer‐led initiatives
☒ Women support services
□ None
□ Other (please specify): 
Q18b) In which of the following settings is Hepatitis C testing delivered in your ADP area?
(select all that apply)
[multiple choice]
☒ Accident & Emergency departments
□ Community pharmacies
☒ Drug services (NHS, third sector, council)
□ Family support services
□ General practices
□ Homelessness services
☒ Justice services
□ Mental health services
☒ Mobile/outreach services
☒ Peer‐led initiatives
□ Women support services
□ None
□ Other (please specify):

Page 303

12 
Q18c) In which of the following settings is the provision of injecting equipment delivered in
your ADP area? (select all that apply)
[multiple choice]
☒ Accident & Emergency departments
☒ Community pharmacies
☒ Drug services (NHS, third sector, council)
□ Family support services
□ General practices
☒ Homelessness services
☒ Justice services
☒ Mental health services
☒ Mobile/outreach services
☒ Peer‐led initiatives
☒ Women support services
□ None
□ Other (please specify): 
Q18d) In which of the following settings is wound care delivered in your ADP area? (select
all that apply)
[multiple choice]
☒ Accident & Emergency departments
□ Community pharmacies
☒ Drug services (NHS, third sector, council)
□ Family support services
□ General practices
☒ Homelessness services
☒ Justice services
☒ Mental health services
☒ Mobile/outreach services
☒ Peer‐led initiatives
☒ Women support services
□ None
□ Other (please specify): 
Q19a) Are there protocols in place to ensure all prisoners identified as at risk are offered
with naloxone upon leaving prison? (select only one)
[single option]
☒ Yes
□ No
□ No prison in ADP area 
Q19b) If no, please provide details.
[open text – maximum 255 characters]

Page 304

13 
People most at risk have access to treatment and recovery
Q20a) Are referral pathways in place in your ADP area to ensure people who experience a
near‐fatal overdose (NFO) are identified and offered support? (select only one)
[single option]
☒ Yes
□ No
□ Don’t know 
Q20b) If yes, have people who have experienced a near‐fatal overdose been successfully
referred using this pathway? (select only one)
[single option]
☒ Yes
□ No
□ Don’t know 
Q20c) If no, when do you intend to have this in place?
[open text – maximum 255 characters] 
Q21) In what ways have you worked with justice partners? (select all that apply)
[multiple choice]
☒ Contributed towards justice strategic plans (e.g. diversion from justice)
☒ Coordinating activities
☒ Information sharing
☒ Joint funding of activities
☒ Justice partners presented on the ADP
☒ Prisons represented on the ADP (if applicable)
☒ Providing advice/guidance
□ None
□ Other (please specify): 
Q22a) Do you have a prison in your ADP area? (select only one)
[single option]
☒ Yes
□ No

Page 305

14 
Q22b) Which of the following activities did the ADP support or fund at the different stages
of engagement with the justice system? (select all that apply)
[multiple choice] 
Pre‐arrest In police
custody
Court Prison (if
applicable)
Upon
release
Community
justice
Advocacy ☐ ☒ ☒ ☒ ☒ ☐
Alcohol
interventions ☐ ☒ ☐ ☒ ☒ ☒
Alcohol
screening ☐ ☒ ☐ ☒ ☐ ☐
Buvidal
provision ☒ ☐ ☐ ☒ ☒ ☐
Detoxification ☐ ☐ ☐ ☐ ☐ ☐
Drugs screening ☐ ☒ ☐ ☒ ☐ ☐
Psychological
screening ☐ ☒ ☐ ☒ ☐ ☒
Harm reduction ☐ ☒ ☐ ☒ ☒ ☒
Health
education ☐ ☐ ☐ ☐ ☐ ☐
“Life skills”
support or
training (e.g.
personal/social
skills,
employability) 
☐ ☐  ☐  ☐  ☒  ☒
Opioid
Substitution
Therapy
(excluding
Buvidal) 
☐ ☐  ☐  ☒  ☒  ☒
Peer‐to‐peer
naloxone ☐ ☒ ☐ ☒ ☒ ☒
Recovery cafe ☐ ☐ ☐ ☒ ☒ ☒
Recovery
community ☐ ☐ ☐ ☐ ☐ ☐
Recovery wing ☐ ☐ ☐ ☐ ☐ ☐
Referrals to
alcohol
treatment
services 
☐ ☒  ☐  ☒  ☒  ☒
Referrals to
drug treatment
services
☐ ☒ ☐ ☒ ☒ ☒
Staff training ☐ ☐ ☐ ☐ ☐ ☐
Other (please
specify)

Page 306

15 
Q23a) How many recovery communities are you aware of in your ADP area?
[open text, integer]
6
Q23b) How many recovery communities are you actively engaging with or providing support
to?
[open text, integer]
6
Q24a) Which of the following options are you using to engage with or provide support to
recovery communities in your area? (select all that apply)
[multiple choice]
☒ Funding
☒ Networking with other services
☒ Training
□ None
□ Other (please specify): 
Q24b) How are recovery communities involved within the ADP? (select all that apply)
[multiple choice]
☒ Advisory role
☒ Consultation
☒ Informal feedback
□ Representation on the ADP board
□ Recovery communities are not involved within the ADP
□ Other (please specify):

Page 307

16 
People receive high quality treatment and recovery services
Q25) What treatment or screening options are in place to address alcohol harms? (select all
that apply)
[multiple choice]
☒ Access to alcohol medication (Antabuse, Acamprase, etc.)
☒ Alcohol hospital liaison
☒ Alcohol related cognitive testing (e.g. for alcohol related brain damage)
☒ Arrangements for the delivery of alcohol brief interventions in all priority settings
☒ Arrangement of the delivery of alcohol brief interventions in non‐priority settings
☒ Community alcohol detox
☒ In‐patient alcohol detox
☒ Fibro scanning
☒ Psychosocial counselling
□ None
□ Other (please specify): 
Q26) Which, if any, of the following barriers to residential rehabilitation exist in your ADP
area? (select all that apply)
[multiple choice]
□ Current models are not working
□ Difficulty identifying all those who will benefit
☒ Further workforce training required
□ Insufficient funds
☒ Lack of specialist providers
□ Scope to further improve/refine your own pathways
□ None
□ Other (please specify): 
Q27) Have you made any revisions in your pathway to residential rehabilitation in the last
year? (select only one)
[single option]
□ No revisions or updates made in 2022/23
☒ Revised or updated in 2022/23 and this has been published
□ Revised or updated in 2022/23 but not currently published 
Q28) Which, if any, of the following barriers to implementing MAT exist in your area? (select
all that apply)
[multiple choice]
□ Difficulty identifying all those who will benefit
☒ Further workforce training is needed
□ Insufficient funds
□ Scope to further improve/refine your own pathways
□ None
□ Other (please specify):

Page 308

17 
Q29a) Which of the following treatment and support services are in place specifically for
children and young people aged between 13 and 24 using alcohol? (select all that apply)
[multiple choice] 
13‐15 (secondary S1‐4) 16‐24 (young people)
Alcohol‐related medication
(e.g. acamprosate, disulfiram,
naltrexone, nalmefene) 
☐ ☐
Diversionary activities ☒ ☒
Employability support ☒ ☒
Family support services ☒ ☒
Information services ☒ ☒
Justice services ☒ ☒
Mental health services ☒ ☒
Outreach/mobile ☐ ☒
Recovery communities ☐ ☒
School outreach ☒ ☒
Support/discussion groups ☒ ☒
Other (please specify)   
Q29b) Please describe what treatment and support is in place specifically for children aged
0‐4 (early years) and 5‐12 (primary) affected by alcohol.
[open text – maximum 2000 characters]
Barnardos offer direct support to CYP in North Lanarkshire ‐ this is commissioned directly
via NLADP. Additional capacity withing CL&D has been resourced via the ADP to support
moed towards the Planet Youth model. 
Q30a) Which of the following treatment and support services are in place specifically for
children and young people aged between 13 and 24 using drugs? (select all that apply)
[multiple choice] 
13‐15 (secondary S1‐4) 16‐24 (young people)
Diversionary activities ☒ ☒
Employability support ☒ ☒
Family support services ☒ ☒
Information services ☒ ☒
Justice services ☒ ☒
Mental health services ☒ ☒
Opioid Substitution Therapy ☐ ☐
Outreach/mobile ☐ ☒
Recovery communities ☐ ☒
School outreach ☒ ☒
Support/discussion groups ☒ ☒
Other (please specify)

Page 309

18

Page 310

19 
Q30b) Please describe what treatment and support is in place specifically for children aged
0‐4 (early years) and 5‐12 (primary) affected by drugs.
[open text – maximum 2000 characters]
Barnardos offer direct support to CYP in North Lanarkshire ‐ this is commissioned directly
via NLADP. Additional capacity withing CL&D has been resourced via the ADP to support
moed towards the Planet Youth model. NLADP currently funds a test of change to
understand more around contextual safeguarding for CYP at risk of entering the justice
system as a result of drug related activites. In addition, the ADP funds a test of change to
understand the needs of siblings impacted by drug use ‐ this is match funded by Corra
funding with parental support in place alongside the ToC.

Page 311

20 
Quality of life is improved by addressing multiple disadvantages
Q31) Do you have specific treatment and support services in place for the following groups?
(select all that apply)
[multiple choice] 
Yes No
Non‐native English speakers (English Second Language) ☐ ☒
People from minority ethnic groups ☐ ☒
People from religious groups ☐ ☒
People who are experiencing homelessness ☒ ☒
People who are LGBTQI+ ☒ ☐
People who are pregnant or peri‐natal ☒ ☐
People who engage in transactional sex ☒ ☐
People with hearing impairments ☐ ☐
People with learning disabilities and literacy difficulties ☒ ☐
People with visual impairments ☒ ☐
Veterans ☒ ☐
Women ☒ ☐
Other (please specify)   
Q32a) Are there formal joint working protocols in place to support people with co‐occurring
substance use and mental health diagnoses to receive mental health care? (select only one)
[single choice]
□ Yes (please provide link here or attach file to email when submitting response):
□ No 
Q32b) If no, please provide details.
[open text – maximum 255 characters] 
Q33) Are there arrangements (in any stage of development) within your ADP area for
people who present at substance use services with mental health concerns for which they
do not have a diagnosis?
[open text – maximum 2000 characters]
Turning Point Scotland operated an overdose response service working with the Harm
reduction service, Scottish Ambulance Service, housing and other key stakeholders and
partners. NLAPD recently commisioned this longer‐term adding a crisis support element
which draws on local need and key learning from the Drug Death Task Force funded pilot
and local research/feedback. 
Q34) How are you, as an ADP, linked up with support service not directly linked to
substance use (e.g. welfare advice, housing support, etc.)?
[open text – maximum 2000 characters]
NLADP have 5 sub‐groups with broad representation from welfare/housing and advocacy
colleagues.  These  forums  and  stakeholders  have  actively  shaped  our  commisioning

Page 312

21 
priorities and service landscape over the past year leading to 5 new services being created
to meet local needs.

Page 313

22 
Q35) Which of the following activities are you aware of having been undertaken in local
services to implement a trauma‐informed approach? (select all that apply)
[multiple choice]
☒ Engaging with people with lived/living experience
☒ Engaging with third sector/community partners
☒ Recruiting staff
☒ Training existing workforce
☒ Working group
□ None
□ Other (please specify):

Page 314

23 
Children, families and communities affected by substance use are supported
Q36) Which of the following treatment and support services are in place for children and
young people (under the age of 25) affected by a parent’s or carer’s substance use? (select
all that apply)
[multiple choice] 
0‐4 (early years) 5‐12 (primary) 13‐15 (secondary
S1‐4)
16‐24 (young
people)
Carer support ☐ ☒ ☒ ☒
Diversionary
activities ☐ ☒ ☒ ☒
Employability
support ☐ ☐ ☒ ☒
Family support
services ☐ ☒ ☒ ☒
Information
services ☐ ☒ ☒ ☒
Mental health
services ☐ ☒ ☒ ☒
Outreach/mobile
services ☐ ☐ ☒ ☒
Recovery
communities ☐ ☐ ☐ ☒
School outreach ☐ ☒ ☒ ☒
Support/discussion
groups ☐ ☒ ☒ ☒
Other (please
specify)     
Q37a) Do you contribute toward the integrated children’s service plan? (select only one)
[single option]
☒ Yes
□ No
□ Don’t know 
Q37b) If no, when do you plan to implement this?
[open text – maximum 255 characters]

Page 315

24 
Q38) Which of the following support services are in place for adults affected by another
person’s substance use? (select all that apply)
[multiple choice]
☒ Advocacy
☒ Commissioned services
☒ Counselling
☒ One to one support
☒ Mental health support
☒ Naloxone training
☒ Support groups
☒ Training
□ None
□ Other (please specify): 
Q39a): Do you have an agreed set of activities and priorities with local partners to
implement the Holistic Whole Family Approach Framework in your ADP area? (select only
one)
[single option]
☒ Yes
□ No
□ Don’t know 
Q39b) Please provide details.
[open text – maximum 255 characters]
Barnardos and Phoenix Furtures lead  this  work  locally  alongside statutory  and  wider
communty sector colleagues. There is a whole family approach sub‐group within the ADP
as well as an early intervention and prevention group. 
Q40) Which of the following services supporting Family Inclusive Practice or a Whole Family
Approach are in place? (select all that apply)
[multiple choice] 
Family member in
treatment
Family member not in
treatment
Advice ☒ ☒
Advocacy ☒ ☒
Mentoring ☒ ☒
Peer support ☒ ☒
Personal development ☒ ☒
Social activities ☒ ☒
Support for victims of gender based
violence ☒ ☒
Other (please specify)

Page 316

25 
Confirmation of sign‐off
Q41) Has your response been signed off at the following levels?
[multiple choice]
☒ ADP
☒ IJB
□ Not signed off by IJB (please specify date of the next meeting): 
Thank you for taking the time to complete this survey, your response is highly valued. The
results will be published in the forthcoming ADP annual report, scheduled for publication in
the autumn. 
Please do not hesitate to get in touch via email at substanceuseanalyticalteam@gov.scot
should you have any questions. 
[End of survey]

Page 317

1
REPORT
Item No: 12
SUBJECT: Equality Outcomes and Mainstreaming Report update
TO: Performance, Finance & Audit Committee
Lead
Officer for
Report:
Ross McGuffie, Chief Officer NHSCP
Author(s) of
Report 
Maria Williamson
(Acting) Head of Planning, Performance and Quality Assurance
DATE: 21 June 2023
1. PURPOSE OF REPORT
This paper is coming to the IJB to provide a progress update on the actions set out in
the Equality Outcomes and Mainstreaming Report 2022-24 reported to IJB in June
2022.
For approval ☐ For endorsement ☒ To note ☒
2. ROUTE TO THE BOARD
This paper has been:
Prepared By:
(Acting) Head
of Planning,
Performance
and Quality
Assurance
☒ Reviewed By:
Chief Officer
☒ Endorsed By:
Chief Officer
☒
1

Page 318

2 
3. RECOMMENDATIONS
It is recommended that the IJB PFA Committee:
(1) Note the progress update to the actions set out in the Equality Outcomes and
Mainstreaming Report 2022-24. 
4.  VARIATIONS TO DIRECTIONS?               
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 The Equality Act 2010 stipulates that all public bodies across Scotland are
required to produce and deliver a set of equality outcomes to further one or
more of the three needs of the Public Sector Equality Duty (PSED/also known
as General Duty).
5.2 The Act provides specific protection to people who are discriminated against
based on a defined set of nine “protected characteristics”. The nine protected
characteristics are:
 Age
 Disability
 Gender reassignment
 Marriage and civil partnership
 Pregnancy and maternity
 Race
 Religion and belief
 Sex
 Sexual orientation
5.3 On 27th May 2012, the Equality Act (2010) (Specific Duties) (Scotland)
Regulations 2012, came into force, to support public bodies in their
performance of the general equality duty. This places a statutory duty on
designated public bodies to:
 Report progress on mainstreaming the public sector equality duty
 Publish equality outcomes and report progress
 Assess and review policies and practices (impact assessment)
 Consider award criteria and conditions in relation to public procurement
 Publish in a manner that is accessible. 
Yes  ☐ No ☒ N/A ☐
2

Page 319

3 
5.4 In April 2015 the Scottish Government added Integrated Joint Boards to
Schedule 19 of the Equality Act 2010 and to The Equality Act 2010 (Specific
Duties) (Scotland) Amendment Regulations 2015.
5.5 A mainstreaming report was submitted to IJB in June 22 (see appendix 1),
with equality outcomes based on the commissioning intentions of the 2020-23
strategic commissioning plan. At that time participation and engagement work
had already commencing around the next 2023-26 Strategic Commissioning
Plan.  
5.6 Progress against the equality outcomes and the action plan was agreed to be
monitored via the Performance, Finance and Audit sub-committee. An update
has been added to appendix two from the Mainstream report (see appendix 2)
5.7  North Lanarkshire Council has established an Equalities Delivery Board, with
engagement from all council services including Adult Health & Social Care. 
The Equalities Delivery Board role is to:  
• enable collective ownership of the delivery of the Council’s
Equalities Strategy and its associated objectives and outcomes 
• ensure the effective implementation of the Equalities Delivery
Framework  
• provide a cross-service approach to the advancement of equality
in the line with the ambitions set out in the Plan for North
Lanarkshire 
• advise the Council on matters of compliance re the Public Sector
Equality Duties (General and Specific) and any relevant
implication for Council policy 
• support and champion the work of the Employee Equality Forum,
and other corporate equalities campaigns and activities  
• engage across services to ensure equality is embedded and
advanced via the development of individual service Equality
Action Plans  
• Encourage improved equalities reporting amongst our employee
base and provide ideas and input for ways in which we can
directly engage residents and groups of staff.   
• Consider relevant religious, cultural and other Equalities related
events, conferences and celebrations that the Council may wish
to support and participate in e.g Pride Glasgow  
• develop a robust performance monitoring framework that will
more effectively measure performance and impacts against our
equality outcomes. 
5.8  NHS Lanarkshire is integrating equality into the day-to-day working, taking
equality into account in the way the organisation exercises their functions,
ensuring equality is part of everything that the organisation does. The NHS
Lanarkshire’s Equality Strategy 2021-2025 sets out a range of activities that
enable the health board to meet their commitments to the equalities agenda
3

Page 320

4 
as well as their legal equality duties.  The NHS Lanarkshire Equality and
Diversity Steering Group has a similar focus/objective to the North
Lanarkshire Equalities Delivery Board and oversees the delivery of the
Equality Strategy actions across NHS Lanarkshire and publishes progress
reports to the following groups: 
• NHS Lanarkshire Board
• Corporate Management Team
• Staff Governance Committee
• Population Health Primary & Community Services Governance
Committee. 
In 2021, NHS Lanarkshire developed and published two Equality Outcomes
(Near Me and Staff Equality Networks) and as part of the development of
NHS Lanarkshire’s Quality Strategy 2021-25 two further Equality Outcomes
are being published in 2023 (Healthcare needs assessment of resettled
populations in Lanarkshire and Greenspace and biodiversity).   
6. CONCLUSIONS
6.1 To ensure successful delivery of the 2023-26 Strategic Commissioning Plan,   
it is important to ensure the mainstreaming report is updated as our new
commissioning intentions are progressed.
6.2 It remains vital that we are fully committed to the values and ethos of the
Equality Act 2010, ensuring equality is mainstreamed and that everyone in
North Lanarkshire has equal opportunities regardless of their age, ability,
gender, sexual orientation, race, belief, childbearing.
6.3 Adult Health & Social Care is developing a service action plan which will feed
into and form the basis of the council’s corporate equalities action plan,
monitored through the Equalities Delivery Board. 
6.4 The council is reviewing its EQIA arrangements and a revised and improved
approach will be co-ordinated and progressed via the Equalities Delivery
Board. The service has identified an Equalities lead (Senior Manager,
Strategy & Performance), responsible for ensuring the effectiveness of EQIA
use within the service. A revised programme of EQIA training is being
developed to support the roll out of the new process. Working with the
council’s Equalities Manager, the Equalities lead will develop a process for the
periodical review of compliance.
6.5 NHS Lanarkshire continues to ensure the ongoing importance of embedding
equalities into the organisation through the use of equality impact
assessment, with the EQIA tool recently being adapted to incorporate socio-
economic impact in line with the Fairer Scotland Duty and to give
consideration to the articles of the United Nations on the Convention of the
Rights of the Child (UNCRC). With the Equality and Diversity Steering Group
continuing to provide Bi-annual reports on the delivery of Equality strategy
actions. 
4

Page 321

5 
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
7.2 ASSOCIATED MEASURE(S)
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
n/a Low 
7.5  ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken.
Objectives  Further Details 
Yes  ☐ No ☐ N/A ☒
5

Page 322

6 
☒ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
A range of engagement activities
are in place across NL. Plans in
place to strengthen our approach
and ensure broader reach across
all of our communities.
☒ Provide stakeholders with information on
how to get involved 
☒ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☒ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☒ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery 
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings 
☒ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff
The planned refresh of our
engagement and participation
strategy and approach will support
the development of participation
guidelines. 
☒ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
EQIA added to website: Relevant EQIAs are published on the HSCP North
Lanarkshire website. 
Yes  ☐ No ☒ N/A ☐
Yes /
Date
added 
☒ No ☐ N/A ☐
6

Page 323

7 
8. BACKGROUND PAPERS
8.1 HSCNL Mainstreaming Report June 22 
https://mars.northlanarkshire.gov.uk/egenda/images/att98267.pdf
8.2  Delivering for Communities – Engagement and participation
https://mars.northlanarkshire.gov.uk/egenda/images/att100738.pdf 
9. APPENDICES
9.1 Equality Outcomes.
9.2 Keep Well flash report.
9.3 NHS Lanarkshire Mainstreaming Report 2023. 
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact
the following; Maria Williamson, Senior Manager, Quality Assurance. (Acting) Head
of Planning, Performance and Quality Assurance WilliamsonM@northlan.gov.uk 
7

Page 324

8 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed 
8

Page 325

Appendix 1 
Equality Outcome Protected
Characteristics
Actions Lead Progress Update May 23
Inequalities in North
Lanarkshire have been
further exacerbated by the
Covid-19 pandemic.
Through targeted
interventions, people with a
protected
characteristic(s) will be
supported to maximise their
health and wellbeing
through the pandemic
recovery.
1,2,3,4,5,6,7,8,9 Creation of Long Covid AHP Team to
provide proactive supports to those
with lasting effects from Covid. 
Development of anti-viral pathway to
support those most at risk of
complications from Covid. 
Head of Health
Medical Director
Head of Health
Improvement
NHS Lanarkshire is following
evidence as adopted by Scottish
Intercollegiate Guidelines Network
and National Institute for Clinical
Excellence. The Long Covid
rehabilitation pathway is based on
those guidelines with the support of
a holistic multi professional team,
that meets every 3 months.
Learning from this pathway will
inform how we develop our
rehabilitation support for people
with long term conditions. Long
Covid rehabilitation pathway is led
by South HSCP and has been in
place since May 22. 
The anti-viral pathway has been in
place since Dec 21 and sits
operationally in the Flow Navigation
Centre. Treatment is accessed
through a single point.
9

Page 326

Targeted role out of Covid-19
vaccination programme, including
proactive use of home visits and
clinics supporting identified groups. 
Use of Keep Well to provide practical
supports to key communities such as
Gypsy Travellers and Homeless. 
Utilise Covid Community Champions
group to proactively engage with
seldom heard groups 
Complete 
7 Priority groups supported through
an outreach service. 72% of clinics
held out with Health premises.
Learn pro module developed to
raise better awareness of Gypsy
Traveller Communities. 
Proactively engaging with
underrepresented groups forms
part of our revised engagement. 
10

Page 327

Through development of our
first responses, we will make
services and supports more
accessible to meet the
needs of people with a
protected characteristic(s) to
maximise independence
and connectedness.
1,2,3,4,5,6,7,8,9 Development of Home
Assessment Teams in each Locality
to provide rapid response at home
for those that require it and faster
discharge from hospital. 
Development of CAPA model to
support faster and effective access to
mental health and wellbeing supports
for children and young people. 
Development of Mental Health in
Primary Care teams to create rapid
access to appropriate level mental
health and wellbeing supports for
adults. 
Creation of Community Connectors in
the third sector, providing proactive
support to access a wide range of
community-based supports,
including mental health and
wellbeing, for all ages in North
Lanarkshire
Head of Health
Head of Adult SW
Head of
Planning
HAT teams established in 2 of the 6
localities, with plans to expand
across NL. Support delivered to
over 700 people. 
We started using the CAPA model in
April 23 and aim to have this fully
embedded in CAMHS by Autumn
23. 
10 Community Connector posts
have been agreed and are
progressing to recruitment.
11

Page 328

Equality Outcome Protected
Characteristics
Actions Lead Progress Update May 23
The HSCPs Engagement
and Participation Strategy
will ensure that we are able
to actively engage with a
much wider range of
individuals in North
Lanarkshire, including those
from seldom heard groups,
supporting people with a
protected characteristic(s) to
be engaged in the design
and delivery of services
1,2,3,4,5,6,7,8,9 Develop Locality Profiles to fully
understand the needs of each
Locality area. 
Create a diverse range of
engagement and participation
opportunities to suit different needs. 
Provide support to enable
stakeholder representatives to
participate meaningfully. 
Development of Locality Planning
Group structures to support
proactive engagement at a local
level. 
Expansion of the IJBs Strategic
Planning Group to widen patient,
service user and carer representation
Head of
Planning
Manager Adults
– Planning
OD Manager
Locality profiles have been updated. 
Plans to strengthen engagement and
participation activity are underway
and it is anticipated revised
arrangements will be in place from
Oct 23.   
Revised arrangements will facilitate a
range of support to enable meaningful
participation. 
Locality Planning Groups have been
refreshed, with updated Terms of
Reference. 
Group has been expanded to ensure
wider representation. Planned mix of
meeting in person and online to
enable active participation. 
12

Page 329

Through  proactive
engagement and Market
Facilitation, the HSCP will
support the Independent
Sector to flourish, creating
varied and person-centred
supports for individuals
including those with
disabilities, long term
conditions, or who are frail;
supporting
individuals to have greater
choice and control over their
care; and creating sustained
employment opportunities
within the North Lanarkshire
area
1,2,3,4,5,6,7,8,9 Development of the partnership’s
Market Facilitation Plan to reflect
pandemic recovery. 
Creative use of independent sector
sustainability payments to support
local providers. 
Development of regular provider
support calls for Care at Home and
Care Homes, creating the
opportunity for ongoing dialogue,
peer support and collaboration 
Continued development of Self-
Directed Support to ensure people,
including those with physical or
learning disabilities, long term
conditions, mental health problems
and frailty can exercise choice and
control over their care.
Head of
Planning
Head of Adult
SW
Manager Adults
– QA
Manager Adults
– younger
adults
Engagement has been maintained
across the sector to ensure capacity.
Link with Scottish Care are
established, and a recent recruitment
event received positive feedback. 
Sustainaiblity payments to support
local provider have been utilised to
create capacity and support
recruitment and retention. 
Regular provider support calls
continued throughout Covid. These
have progressed to quarterly in
person sessions. 
Transformational programme in
progress that considers a whole
system approach.
13

Page 330

Through the development of
Technology Enable Care,
individuals including children
and young people, those
with disabilities, long term
conditions, or who are frail
1,2,3,4,5,6,7,8,9 Sustained roll out and use of Near Me
across community health and social
care services to provide alternative
means of engagement. 
Development of the TEC Flat in
Allershaw Tower to support staff
and service users/carers to see TEC
in action and enable innovative
solutions to retain independent living.
Head of Health
Head of Adult
SW
Head of
Planning 
Remains an innovative project
showcasing a mixture of NLC
provided equipment and mainstream
technology.  Utilised regularly to
educate staff across the partnership
on the benefits of technology.  Open
invitation to provide solutions that can
promote safety, enhance wellbeing
and support choice and
independence.  Focus on finding
technology-based solutions to enable
people to remain independent and
safe in their day to day lives.     
Launched Making Life Easier blog
and quarterly newsletter to increase
engagement. 
Disability Information Officer post now
filled and launched Making Life Easier
clinics operating within each locality
area
14

Page 331

Equality Outcome Protected
Characteristics
Actions Lead Progress Update May 23
will have alternative
methods to engage with
services and more
innovative solutions to
remain living
independently, connected in
their own community.  
Continued expansion of the Making
Life Easier website to support
self-management,
assessment and access to simple
equipment. 
Roll out of a wide range of online
Mental Health resources  
Planning for a dedicated Assistive
Technology area and self-assessment
on Making Life Easier. link established
to technology flat video demonstrating
TEC to public. 
Developed communication plan that
includes training and promotion of
Making Life Easier at local events,
libraries, community centres. 
A wide range of online Mental Health
resources have been rolled out, with
plans to create a dedicated area for
Mental Health on Making Life Easier. 
Phone Assessment training has been
delivered to Access Social Work staff
to reduce service user waiting lists. 
Making Life Easier content reviewed to
ensure relevance and local focus of
information. 
Plan in place to review existing
assessments with the aim to
streamline. 
1. Age
2. Disability
3. Gender reassignment
4. Marriage and civil partnership 15

Page 332

5. Pregnancy and maternity
6. Race
7. Religion and belief
8. Sex
9. Sexual orientation
 
16

Page 333

Health Improvement
Keep Well Flash Report 2022/2023
Keep Well is a Nurse led service with a pan Lanarkshire remit. The focus of KW is to engage and support the most vulnerable 
populations who do not readily access mainstream services. 
Keep Well assisted Organisational Development with a new 
Learn Pro Module to raise awareness of Gypsy Traveller 
Communities. This NHS Lanarkshire module has now been 
launched and is available via Learn Pro platform.
We would like to take this opportunity to encourage our NHS 
colleagues to undertake this module.
New Learn Pro Module
Priority was given to the groups and communities the team were still to 
reengage with, following the Covid‐19 Pandemic. By March 2023, the 
team have made significant progress and have started to begin work 
with the last Priority Group. 
Working closely with partner services, the team provide an outreach 
service with most of the clinics delivered in community settings such as 
Restorative Justice premises, Places of Worship, Temporary Homeless 
Accommodation Units, Recovery Community premises for example. 
72% clinics held during 2022 ‐23 were in non NHS premises.
As with last year, 90% of referrals to Keep Well are from Addiction 
Support Services. The referrals from these partner services have 
increased by 71% compared with Pre Pandemic 
levels (April 22 – March 23). 
Keep Well Priority Groups
7 Priority 
Groups
• Black, Asian and Minority Ethnic
Groups (BAME)
• Gypsy Traveller community,
• those affected by Homelessness
• those within community justice
system,
• those with problematic
substance use
• those from the Deaf Community
• CarersGypsy Traveller Event
Over 2 days in August, KW team
attended an event in partnership
with MECOPP Community Health
Workers. The team were able to
deliver 23 health checks to
community members.
This resulted in half of those
patients seen requiring a referral
to GP practice for review of
abnormal clinical findings. The
team were able to support an
individual who lived out with the
Lanarkshire area obtain vital
repeat medication. 17
Appendix 2

Page 334

Health Improvement
69 participated in the online pilot 
FOR MORE INFORMATION PLEASE CONTACT ALANA MCGLYNN, HEALTH IMPROVEMENT PROGRAMME MANAGER ALANA.MCGLYNN@LANARKSHIRE.SCOT.NHS.UK OR
KEEP WELL TEAM ON 01698 754260 keepwell.lanarkshire@nhs.scot
Priority will be given to the recovery of the last 
remaining Priority Group and clinic dates have been 
secured for some of the partners within this group. 
Keep Well have agreed to support North ADP with 
locality events planned during 2023‐24. This will 
involve partnership working with commissioned 
services along with other 3rd sector and voluntary 
services.  
Support will also be provided by the team to assist NHS 
Lanarkshire to meet the ‘Hepatitis C elimination’ 
targets set by Scottish Government. 
The team look forward to welcoming back one of our 
nurses from maternity leave returning our capacity to 3 
Registered Nurses and 1 Health Care Support Worker.
Development for 23/24
• Delivered 177 clinics
• Engaged with 438 patients
• 69% of patients seen were case managed
• 42% of attendees were found to have clinical risk that
required further investigation by their GP practice. Some
examples include elevated blood pressure, elevated blood
cholesterol level, elevated blood glucose level, irregular
pulse rate, raised assign score, poor mental health
• There were 686 referrals made to other services to support
health behaviour change. Some examples include NL
Leisure, SL Leisure and Culture, Addiction Support Services,
Quit Your Way, Harm Reduction Team, Health and
Homeless team, Lanarkshire Weight Management Team,
Financial Inclusion Services.
• 32 Referrals made to Homeless, Sexual Health and Cancer
Screening Project
• 303 patients were case managed in this period
• 105 people accepted testing for Blood Borne Virus
detection
• 139 Individual referrals were received from partner
services
Activity 2022/23
KW Team
2 Nurses
1 HSW
Patient feedback“Thank you very much
for taking the time to enquire about my health” 
“I’m so grateful and thankful you seen me. My GP sent me 
straight to hospital, as my blood pressure remained dangerously 
high, you saved my life” 
18

Page 335

1
NHS Lanarkshire Equalities Progress Report 2021-23
Covering:
 Equality Mainstreaming
 Equality Outcomes
 Workforce
 Workforce Data
19
Appendix 3

Page 336

2 
Accessibility
If you would like this document in a language or format of your choice
including large print, audio, braille, or if you have any questions or want
to provide feedback please contact: 
Call   
Hina Sheikh - 01698 754294 
E- Mail   
hina.sheikh@lanarkshire.scot.nhs.uk 
Languages   
Hina Sheikh - 01698 754294 
Write to:  Hina Sheikh 
Equality and Diversity Manager
NHS Lanarkshire
Law House 
Airdrie Road 
Carluke ML8 5ER 
20

Page 337

3 
CONTENTS 
Page
1. Introduction    4
2. Mainstreaming  4
3. About Us    5
4. NHS Lanarkshire’s Commitments    6    
4.1 Strategy, Leadership and Governance  8
4.2 Community Engagement    12
4.3 Health Inequalities 18
4.4 Developing the Workforce 24
5. Equality Outcomes  31
5.1 Equality Outcomes 1 & 2: Update Reports April to December
2022
32
5.2 Equality Outcomes 3 & 4: 2023 – 2025 38
6. NHS Lanarkshire Board Diversity Data  44
7. Workforce Data  45
7.1 Workforce characteristics 46
7.2 Training  50
7.3 Leavers  53
7.4 Recruitment  55
7.5 Employee relations and  58
7.6 Occupational Segregation Information/Equal Pay Data 61
8. Procurement  62
9. Conclusion 63 
21

Page 338

4 
1. Introduction 
The Equalities agenda continues to be a significant area of on-going
improvement and development for NHS Lanarkshire, post publication of a range
of documentation in 2021, which set out our commitment and direction of work for
the following four years. 
In this second year update report we highlight the
progress being made to embed equalities
throughout the organisation. Going beyond our
legal requirements is a clear statement of our intent
to deliver services that reflect and respond to the
needs of all the communities we serve within NHS
Lanarkshire. 
At this time of producing this report we are still responding to the Covid-19
pandemic and severe service pressures. The pandemic has had, and will
continue to have, a significant influence on us all, but our experiences will vary as
Covid-19 has exposed and amplified pre-existing levels of social and economic
inequality. This means it is more important than ever for us to ensure that the
Equalities agenda continues to be a significant area of on-going improvement
and development for NHS Lanarkshire. 
It should be noted that the content of the report highlights progresses up to and
including 31 December 2022 to allow for our internal governance processes prior
to publication in April 2023. 
2. Mainstreaming 
Mainstreaming is a specific requirement for public bodies in relation to
implementing the Equality Duty 2010. In simple terms it means integrating
equality into the day-to-day working of NHS Lanarkshire, taking equality into
22

Page 339

5 
account in the way we exercise our functions. In other words, equality should be
part of everything we do. 
On 5 April 2011 the Equality Act 2010 introduced a new public sector equality
duty (also known as the General Equality Duty) which requires public authorities,
in the exercise of their functions, to have due regard to the need to: 
1. Eliminate unlawful discrimination, harassment and victimisation and any other
conduct that is prohibited under this Act;
2. Advance equality of opportunity between people who share a relevant
protected characteristic and those who do not share it;
3. Foster good relations between persons who share a relevant protected
characteristic and persons who do not share it. 
3. About Us   
NHS Lanarkshire is the third largest health board in Scotland. We serve a
population of over 660,000 across rural and urban communities in Lanarkshire
(2021 mid-year estimate) and employ over 14,000 staff working in communities,
health centres, clinics and offices and at our three acute hospitals – University
Hospital Hairmyres, University Hospital Monklands and University Hospital
Wishaw. 
23

Page 340

6 
We aim to continue to provide the best care and treatment we can, within the
resources available to us, while ensuring everyone working in NHS Lanarkshire is
trained and skilled for their job to deliver a safe and efficient, person centred
service. 
We are committed to delivering high quality, innovative health and social care
that is person-centred. Our aim is that everyone is able to live longer, healthier
lives at home, or in a homely setting. For more information about our organisation
and services, please select the link below to access our website: 
https://www.nhslanarkshire.scot.nhs.uk/about-us/ 
4. NHS Lanarkshire’s Commitments   
In NHS Lanarkshire’s Equality Strategy 2021-2025 we set out a range of activities
that we believed would help us meet our commitment to the equalities agenda
and our legal equality duties. 
The Equality and Diversity Steering Group oversees the delivery of the Equality
Strategy actions and publishes progress reports: 
 Bi-annual reports to NHS Lanarkshires: Board,
Corporate Management Team, Staff
Governance Committee, and the Population
Health Primary & Community Services
Governance Committee.   
Equality Impact Assessment (EQIA)
NHS Lanarkshire continues to ensure the ongoing importance of embedding
equalities into the organisation through the use of equality impact assessment. 
In 2020 we incorporated considerations of socio-economic impact in line with the
Fairer Scotland Duty and in 2022 we further adapted the EQIA tool to give
consideration to the articles of the United Nations on the Convention of the Rights
of the Child (UNCRC).
24

Page 341

7 
How we developed NHS Lanarkshire’s Equality Strategy 2021-25
To inform the development of the 2021-2025 Strategy, NHS Lanarkshire Equality
and Diversity Steering Group held a series of online workshops, the workshops
identified key areas and actions which will be delivered over the next four years
by the identified leads. Building on the range of good practice that already exists,
the Equality Strategy 2021-2025 includes new areas of work to reflect local and
national policies to ensure our equality strategy remains contemporary. 
An important aspect of the Equality Strategy is recognising that an intersectional
approach is key in the design and delivery of any area of work. 
What this report includes
This report is a snap shot of some of the work being carried out in areas
committed to in NHS Lanarkshire’s equality strategy 2021-25.
These are:      
4.1 Strategy, Leadership and Governance; 
4.2 Community Engagement; 
4.3 Health Inequalities; 
4.4 Developing the Workforce. 
Additional Reports attached to this publication evidence: 
 Progress made towards achieving Equality Outcomes published in 2021.
 NHS Lanarkshire’s two new Equality outcomes for 2023-25.
 NHS Lanarkshire Board Diversity Data
 Workforce Equalities Data. 
 Gender Pay/Occupational Segregation Information.                               
25

Page 342

8 
4.1 Strategy Leadership and Governance 
NHS Lanarkshire as an Anchor organisation 
What has been done in the last two years?
In the Summer of 2021 NHS Lanarkshire along with its board members, held an
inequalities seminar, a key focus of which was to reflect on the influence NHS
Lanarkshire can have on the wellbeing of the local community, beyond the delivery
of healthcare, through its role as an inclusive “anchor” organisation.
The term “anchor” refers to the responsibility NHS Lanarkshire has as a large
locally rooted organisation who employs many people and deploys resources and
assets for the benefit of the local population. We know health inequalities are
driven by wider socioeconomic determinants such as poverty, employment,
education and place thus we were keen to identify actions we could take to
positively influence these wider determinants through our anchor role.
Over the last 12-18 months we have reviewed the NHS Lanarkshire baseline
position against each of the anchor pillars in the Joseph Rowntree Foundation
Anchor Progression framework. 
The five pillars are: 
 employer; 
 procurement; 
 environment and assets; 
 service delivery; and, 
 corporate and civic responsibilities. 
This has entailed working with stakeholders to identify current and future actions
for each pillar. Most recently we have recognised our role as a local anchor in
mitigating the impact of the cost of living crisis and we have developed a delivery
plan which outlines the actions we are taking across the five anchor pillars to
support patients, communities and staff with their financial wellbeing.
26

Page 343

9 
What difference have these made?
We have identified a range of actions that contribute to our anchor ambitions and
indicators of success have been identified for each action. Examples include:
 development of a Procurement Strategy with targets for increasing
investment locally; 
 investing in the Supplier Development Programme with key deliverables to
be achieved after one year; 
 promotion of the NHS Community Benefits Gateway to partners; 
 the development of a Community Benefits Plan for the Monklands Hospital
Replacement programme with specific targets for the successful contractor, 
 development of a Staff Health and Wellbeing strategy; and, 
 embedding Integrated Equality Impact Assessment into the work streams of
the new NHS Lanarkshire health and wellbeing strategy Our Health
Together. 
How will outcomes be sustained?
We have worked closely with our Planning and Strategic Delivery Teams in order
to ensure our anchor commitments are fully embedded within the ambitions of Our
Health Together and the way we work as an organisation in the future. We have
also embedded commitment to the anchor principles in the corporate objectives of
all Executive Directors.
What challenges remain?
There are particular challenges around capacity to deliver on some of the
ambitions of the anchor plan and in some areas there is only fixed term funding for
developments. These risks are being identified and escalated as appropriate and
opportunities for other funding sources explored. There are also wider system
pressures post Covid-19 which have made it challenging to spread initiatives such
as routine enquiry for financial wellbeing to all areas.  
What next? Anticipated actions for next 2 years
NHS Lanarkshire’s anchor commitments include enhancing NHS Lanarkshire’s
contribution to community wealth building through offering more targeted
employment opportunities for local people, increasing procurement spend locally,
and being a role model for environmental sustainability through our buildings,
policies and practices. Through working in partnership with other local anchors and
communities, we will also prioritise reviewing how we deliver our services to shift
models of care towards prevention and early intervention, and to ensure services
and programmes are proportionately targeted to those most in need through better
understanding our data and the needs of our communities.
27

Page 344

10 
NHS Lanarkshire Digital Strategy 2023-28 
What has been done in the last two years?
During 2022, a new five-year digital plan was created with wide-ranging
engagement and equality central to its development. 
To launch in 2023, the digital plan (2023-28) describes the benefits of technologies
used by our operational staff, clinical colleagues and also the public and identifies
digital equality as a strategic theme and dedicates a section to this topic. Important
aspects of equality also feature heavily in the five-year vision. 
Developing the plan involved engagement with over 400 individuals, 300 of which
were public/patient responses. Authoring of the plan was intentionally designed to
be inclusive, with 44 authors collaborating to produce this strategic plan.
What difference have these made?
The 2023-28 digital plan has made digital topics more relatable and easier to
understand. This has been achieved by a concerted effort to widen inclusivity,
interest, and involvement. 
The strategy development team engaged with services to better understand their
needs, ‘pains’ and missed opportunities. This included using plain language
wherever possible and collecting a suite of digital-in-action stories from across a
diverse range of Lanarkshire services and settings. 
The stories were carefully crafted to provide a human perspective to any digital
improvement or innovation, by making use of a story-telling method. Making digital
more relatable was identified as a key factor in reducing barriers and people
feeling supported to work together and improve health and social care services
into the next five years. The approach has been well received as people have felt
more empowered to share their opinion, challenges and ideas about digital health
and technology. 
Taking an empathetic, honest and open approach to the strategic engagement
resulted in a higher quality outcome, deeper and more varied view-points and the
resulting difference is a shared strategy that many people can feel they have co-
created and can co-deliver.
28

Page 345

11 
How will outcomes be sustained?
Following development and publication of the digital plan, a further round of
engagement will be undertaken to confirm the operational delivery plan across our
strategic work streams and services. This will ensue that the right stakeholders are
involved to co-deliver the strategic aims and objectives. 
Behind the delivery plan, a programme of work will support the digital team to ‘re-
gear’ in readiness for delivering the plan. This will involve careful consideration of
how the digital team will collaborate continuously with the public, clinicians, staff
and partners by involving them and including digital equality in every aspect of
their work. 
Outcomes from the digital plan will be sustained by ongoing and close alignment to
NHS Lanarkshire’s ‘Our Health Together’ healthcare strategy, and the national
digital health and care strategy.
What challenges remain?
Equality must remain central to delivery of the new digital plan. Digital equality has
a variety of needs to consider, which require to be understood and acted upon
during planning and implementation of new digital solutions. 
Three important aspects of digital equality have been identified and will remain
fundamental to ongoing work:
 How the Lanarkshire public access health and social care services online,
sometimes described as the “patient experience”. 
 How our NHS colleagues deliver health and social care using digital
systems.
 How we design services that make use of digital, to reflect the diverse
needs of our population. 
What next? Anticipated actions for next 2 years
Actively including equality into the digital plan has, without doubt, improved the
overall outcome for everyone in Lanarkshire. The digital team has a more open
and inclusive outlook and wider awareness of the challenges and opportunities
available to NHS Lanarkshire. The outcomes of this work are best communicated
by sharing two aspects of the five-year digital vision, which are:
 Be people centred; by ensuring that human needs are at the heart of
existing and new digital solutions.
 Enhance care for everyone; by championing equal improvements for
everyone, and ensuring we don’t alienate anyone. 
By keeping equality at the heart of this engagement, we have seen a distinct
difference in the resulting language and tone of the digital plan, the more open and
honest responses from people who have engaged, and the general willingness for
people to get involved. 
29

Page 346

12 
4.2  Community Engagement 
Communications
What has been done in the last two years?
 A Community Champions Forum was established to communicate through
the pandemic; 
 Public consultation as part of the planning process for a replacement
University Hospital Monklands.
What difference have these made?
The Community Champions Forum (CCF) was formed during the Covid-19
pandemic and had representatives from Lanarkshire diverse communities. The
CCF represented and provided a greater understanding of the need of
communities. The CCF supported the messaging, design and the sharing of the
range of communications that were shared during the pandemic e.g. leaflets,
posters, messaging in a range of visual (British Sign Language), written formats
and social media materials. 
The Monklands Replacement Project (MRP) pre-application consultation was
facilitated online due to the pandemic. Anyone who required a printed version of
consultation materials could contact the MRP team by email/phone/Freepost.
Similar to the Community Champions, the MRP also has the Monklands
Engagement Forum (MEF). 
The MEF is a governance sub-group established to support and guide the
Monklands Replacement Project team and provide scrutiny in how it informs,
engages and consults with people on the MRP. This group is made up of public,
patients, carers and third sector representatives. Healthcare Improvement
Scotland – Community Engagement also participates. 
Members offer their perspectives on how NHS Lanarkshire informs, engages and
consults with patients, carers and the public on MRP as the project progresses
30

Page 347

13 
and share information/presentations given at meetings with the wider groups they
represent.
How will outcomes be sustained?
Ongoing engagement with the Community Champions Forum will be used to
inform future campaigns and communication material and make sure we continue
to involve people in service planning and design. The Champions Network
continues to meet regularly addressing issues such as Winter Planning and Cost
of Living. With a view to enhancing the voice of young people in our engagement
process, the MRP has established a partnership with North Lanarkshire Council’s
Health & Social Care Academy. The Care Academy provides opportunities for
school students with a specific interest in health and social care to learn about the
subject and potentially find their way to employment in the sector.
What challenges remain?
Work on identifying and developing relationships with Seldom Heard Groups still
needs to be developed.  
What next? Anticipated actions for next 2 years
We will continue to make best use of the Community Champions Forum,
especially with regards to the updated NHS Lanarkshire healthcare strategy ‘Our
Health Together’. 
‘Our Health Together’ will be the main focus of our engagement activities. Our aim
is to develop a wide-ranging engagement programme involving patients, unpaid
carers, our staff and local communities (including children and young people) and
will work together to develop plans that deliver the best possible outcomes. 
A successful engagement process for Our Health Together will ensure:
 People understand the case for change;
 A diverse range of people are motivated to get involved; and
 Innovative solutions are co-designed/co-produced with people.
To achieve this, people (public, patients, carers, staff and other stakeholders) will
be at the heart of Our Health Together. This person-led approach will ensure Our
Health Together is:
 About people; 
 Produced by people; and
 Based on decision making that is informed by people.
Equally with the Monklands Engagement Forum as the Monklands Replacement
Project we will continue to be supported and advised by the group.
31

Page 348

14 
Development of a New Quality Strategy 2023-28   
What has been done in the last two years?
The quality team has been working over the past 11 months (April 2022 to
February 2023) to develop a new Quality Strategy that will replace the existing one
which ran from April 2018- March 2023.  A core part of this process has been the
engagement process put in place to ensure that we have consulted a wide range
people both staff and service users while writing this strategy.
What difference have these made? 
We have engaged with staff and service users in a number of ways.  For staff we
have ensured that early consultation was achieved by taking initial ideas to a
number of governance groups in the Boards including the Equality and Diversity
group, the North Care and Clinical Governance Group and the Area Clinical
Forum. For service users, we developed an online survey that was available both
electronically on a website and via a QR code.  Quality staff also took this survey
out into the community and asked service users attending vaccination centres for
feedback.  Over 400 service users and 290 staff provided feedback.
How will outcomes be sustained?
The survey will be analysed and the feedback used directly in the developed of the
new quality strategy.  
What challenges remain?
We are trying to reach out to some harder to reach groups with our engagement
survey and will continue to work towards this over the next few months.
What next? Anticipated actions for next 2 years
The development and engagement process will continue until we are ready to
publish in April 2023. The strategy will also feed into the yearly implementation
plans which will be used to measure the main themes within the overall quality
strategy.  
32

Page 349

15 
National Model of Complaints Handling Procedure
What has been done in the last two years?
Significant development work to further embed the national model Complaints
Handling Procedure (CHP) has continued.   
This work has been underpinned and driven by acknowledging that an effective
complaint handling procedure should be user-focused, accessible, simple, timely,
thorough, proportionate, consistent, objective, impartial and fair.  We are also
striving to seek early resolution and to analyse complaint outcomes to drive
improvement.  
Examples of work include:  
Stage 2 Investigation Toolkit   
The toolkit has been deployed from October 2022.  The overarching purpose is to
ensure that NHS Lanarkshire Complaint Procedures:
 Take a consistently person-centered approach; 
 Implement a standard process;
 Ensure that staff and people have confidence in complaint handling; and
 Ensure that learning from complaints is used to continuously improve
services. 
The toolkit includes:
 Person Centred Complaint Handling principles, which contains guidance on
person centred investigations and responses, making information
accessible and involving patients and families. 
 Consent guidance.
 Guidance on agreeing the issues to be investigated with the complainant.
 Guidance on producing high-quality person-centred complaint responses.
 In summary, the toolkit provides an agreed set of guidance, templates, and
tools to be used by complaint investigators at each stage, from the point of
receipt through to closure. 
The toolkit includes accessibility considerations. 
Programme for assurance (of best-practice handling) and embedding
learning from complaints 
Developments include:  
 The Healthcare Complaints Analysis Tool (HCAT) has been piloted on closed
maternity complaints.    
 A post complaint (Stage 2) satisfaction survey is in place and can be
provided in different formats.
33

Page 350

16 
 Lessons learned from complaints are included in the organisational learning
bulletin. 
 Quality Assurance processes have been developed and implemented /
reported – applying to a sample of closed complaint files.   
What difference have these made?
 Staff and complainant feedback.  
 Quality assurance mechanisms to reflect on best practice handling.  
 Increasing the number of complaints resolved at Stage 1 . 
How will outcomes be sustained?
 Quality Assurance of cases and analysis of complaint satisfaction results to
monitor quality of complaint handling, and make improvements where
required.
 Ongoing roll-out and embedding of Stage 2 toolkit across the organisation.
 Education and awareness raising.   
What challenges remain? 
Patient affairs activity continues to be variable, with national recognition of the
changing nature of complaints, including increased complexity and challenging
behaviours.  
Transition and alignment of processes will take further time to embed.  We are
also seeking to reduce backlogs, to a refreshed era of higher risk/profile
complaints taking priority, and diverting resources.  
Whilst transiition will contribute to alleviating previously oultined risks, it still be
within the confines of the existing resource/budget. 
What next? Anticipated actions for next 2 years
As above – further development to embed consistent and robust complaint
handling mechanisms across NHS Lanarkshire.   
34

Page 351

17 
Unsolicited service User Feedback 
What has been done in the last two years?
In NHS Lanarkshire our main way of capturing unsolicited patient feedback is via
Care Opinion. Care Opinion is a not-for-profit social enterprise which enables
people to share the story of their care, and perhaps help care services make
changes. We promote the use of Care Opinion by advertising in our hospitals and
community health centres how service users can post their stories on the website.
We continue to train staff in the use of Care Opinion and how to be responders to
stories posted about their service. 
What difference have these made? 
NHS Lanarkshire continues to receive a consistently high number of stories: 767
were posted by members of the public between 1st April 2021 and 31st March
2022.
61% of the stories received are of a positive nature and 39% are critical of the
experience they received.
For the 767 stories posted there were 1,051 responses posted in response. This is
due to the author having contact with more than one area or service. 
Authors tag their story with words to reflect how they feel about the service they
received; what was good and what could be improved. This information is used by
the service the story relates to, to make improvements to their areas.
How will outcomes be sustained?
Monthly statistical reports on the information captured from Care Opinion including
the number of stories, breakdown of positive/critical stories, changes identified as
a result is shared with the Corporate Management Team and Operational Unit who
then cascade this information to frontline teams. 
35

Page 352

18 
The information and feedback within the stories is used for learning and to make
improvements to services based on what the service user has told us.
What challenges remain?
We aim to respond to a story within five days however sometimes it takes longer to
access information to be able to formulate a response and this will exceed the five
days, however every story receives a response. 
10% of stories took longer than five days to provide a response and a deep dive of
these stories was carried out. This provided assurance that it was appropriate that
more time was taken to provide the appropriate response. 
What next? Anticipated actions for next 2 years
We plan to continue to promote use of Care Opinion and to explore how we can
assist service users who may require assistance to use the website.
Feedback received via Care Opinion will continue to inform service planning and
delivery. 
4.3 Health Inequalities 
Health Promoting Health Service 
What has been done in the last two years?
Since January 2022, the Health Promoting Health Service (HPHS) team have
worked with the NHS Lanarkshire Realistic Medicine Team to meet the broad
outcomes of the Chief Medical Office HPHS Letter 2018:3 and the principles of
Realistic Medicine, in particular, a personalised approach to care and shared
decision making. Highlights are as follows:
Recruitment of a Health Improvement Senior (HPHS) for each of the 3 acute sites.
Establishing the relationships to deliver on their programme of work and
implementing tests of change (ToC) to demonstrate the benefit of using a holistic
needs assessment to embed in routine care.
Development of a Holistic Needs Assessment (HNA) to understand the issues
affecting patients and help address these to facilitate safe discharge home. The
HNA is uploaded to Portal Care Plans to ensure there is a record of the action
36

Page 353

19 
taken. A webpage has been created to support patients in improving and
maintaining a healthy lifestyle by providing information on different health topics
and health services in their area.: https://www.NHS
Lanarkshireanarkshire.scot.nhs.uk/services/health-improvement/health-
promoting-health-service/
Staff engagement sessions to ascertain the wellbeing of staff and what they need
from the developing Staff Health and Wellbeing (SHWB) Strategy. Following these
sessions and the results from the SHWB Survey, the acute hospitals held SHWB
events with contributions from the agencies that staff wanted information on. 
What difference have these made?
The HNA has highlighted the needs of people who suffer the greatest inequalities
within our communities and connecting them with the support they require to return
safely to home and maintain their health and wellbeing. 
How will outcomes be sustained?
The aim is to demonstrate how to complete an HNA to further support staff to
complete this as close to admission as possible. This will highlight needs at the
earliest point possible to aid understanding of what the issues are and to signpost
to support or have a referral made, timeously prior to discharge to ensure
discharge is not delayed. This links in with the Discharge without Delay
programme. Discussions have been ongoing with Practice Development to have
the HNA embedded into the admission paperwork.
What challenges remain?
 On-site pressures in terms of workforce and workload has limited the
integration of using a HNA amongst staff and there continues to be a
reliance on referral to the Heath Improvement Seniors (HPHS).
 Time-limited funding. 
What next? Anticipated actions for next 2 years
 Funding is only available until September 2023, therefore, initially actions
will be concentrated on securing further funding. 
 Should this be established, there will be a continuation of support of staff to
undertake the HNA and to support the development of this into routine
paperwork and care.
 There will be a continued support of staff health and wellbeing activities in
line with the published NHS Lanarkshire Staff Health and Wellbeing
Strategy and Action Plan. 
37

Page 354

20 
Healthy Lifestyle in Pregnancy Service (HLiP) 
What has been done in the last two years?
 Adapted in response to the first wave of the pandemic and lockdown
restrictions to Attend Anywhere (Near Me) online consultations and
telephone appointments depending on the patient’s choice/digital access
 Adapted in response again to restrictions and went through a recovery
process to move to a blended model of service delivery which continued
with online and telephone consultations but face to face appointments were
available again across Lanarkshire, following pathways and guidance within
each individual healthcare setting.
 “Meet the Team” videos created and website platform developed to allow
potential service users to find out more about the service and put faces to
the professionals they will be meeting. This url was also included within the
Badger.net app that is used throughout pregnancy and maternity staff can
signpost to this and the leaflets available in the reading library as part of the
discussion/referral process for this clinic. This has also been included as
part of a social media campaign. The videos and website is available
Healthy Lifestyles in Pregnancy Service | NHS Lanarkshire (scot.nhs.uk) 
What difference have these made?
 During the first wave of the pandemic where those pregnant had restricted
access to support, the service continued to be able to support those with a
Body Mass Index of 30 and above with lifestyle change to minimise risk and
provide support for both physical and mental health. This support was then
increased in the return to face to face appointments where service users
were hugely grateful for the intensive support received where access to
other support was still limited.
 Referrals have increased as a result of the increased awareness and
midwives find it useful to have the resources to signpost to. 
How will outcomes be sustained?
 A blended model of service delivery still exists however the majority of
service users prefer face to face but online/telephone appointments are still
available and in action.
38

Page 355

21 
 A continued improvement plan remains in pace to increase referrals and
engagement to the service with ongoing training and awareness sessions
commenced with future dates set.
 New resources (posters and flyers) are in development and will be available
soon and are to be included as part of a new social media campaign in
2023.
 Future service user evaluations will also take place.  
What challenges remain? 
 The service is a pan Lanarkshire service however access to clinic space
within some localities is not available meaning some service users need to
travel to other locations.
 Local target of 40% eligible referred not met (Q1 18% referred, Q2 18%
referred) therefore there are approx. 80% of eligible women not being
referred. It may be that they have been offered referral and declined but
there is no way of recording this on the system. 
 Service is a 0.4WTE service therefore should referrals increase there is a
risk of increased waiting times.
What next? Anticipated actions for next 2 years 
 Continued improvement plan for increasing referrals and engagement with
ongoing training and awareness raising sessions and social media
campaign.
 Development of Gestational Diabetes (GDM) pathway in line with HLiP
pathway for consistency with introduction of physiotherapist input.
 Continue to scope and explore with Obstetric colleagues’ potential for
metabolic clinic pathway for those with BMI≥50 kg/m2 
 Increase reach with clinical space within other localities and areas of need. 
39

Page 356

22 
Condom Distribution Schemes 
What has been done in the last two years? 
 Introduction of the Condoms by Post Service in response to standard
service disruption during COVID-19.
 New partnership with local foodbanks to provide free condoms for
individuals accessing these services directly. 
What difference have these made?
In 2021, the team carried out a social media campaign to promote the Condoms
by Post Service. Over a 7-week period, 1,472 requests were made and fulfilled
with the majority of requests coming from Scottish Index of Multiple Deprivation
(SIMD) 1-3 postcode areas. We asked some additional evaluation questions
during the campaign 100% of those asked if this would be their preferred way to
get condoms on a permanent basis, answered “yes”. We also received positive
qualitative comments. The service now averages around 170 requests per month
and has maintained a high level of requests from SIMD areas 1-3.
The partnership with the local foodbanks is measured more qualitatively via
feedback from the volunteers and staff on site with our team and the condoms
have been positively received, even within faith based settings.
How will outcomes be sustained?
The Condoms by Post Service was easily incorporated during the pandemic as
condoms were not easily accessible in other areas, so in terms of time and cost,
there was no issue as our focus could be shifted to the postal service. Now that
our other services are fully operational again, we have had to consider some
changes in terms of the number of packs per order and frequency of orders and
will continue to monitor uptake to ensure it is manageable as there is no extra
budget or staff time to fulfil this work.
The project co-ordinator will work a locality at a time, involving our department
locality staff who have knowledge and links in their local areas. It is hoped that the
process will become easier as the work continues as we will have more and more
evidence of good partnership working and positive feedback from other staff and
volunteers already involved.
40

Page 357

23 
What challenges remain?
Promotion of the service remains a challenge, our previous experience of paid for
social media campaigns have been very positive and resulted in an increase in
orders. However, the campaigns are expensive to run and the additional costs in
products being requested make it cost prohibitive. As above, as we increase our
reach and the number of foodbanks we provide condoms to, we need to cover this
cost from our limited budget. 
What next? Anticipated actions for next 2 years
The team will continue to offer Condoms by Post as a permanent part of the
overall Condom Distribution Scheme and look at new ways of promoting the
service. We are also involved in National conversations with other boards around
the development of a postal testing scheme for sexually transmitted infections and
the potential to also offer free condoms with these tests, which would increase
demand locally, if a standard national offering cannot be put in place.
We are currently working across Clydesdale, Motherwell and Wishaw localities,
with 5 foodbanks signed up to offer free condoms and information on the wider
Condom Distribution Scheme and sexual health services for some of the most
vulnerable in our communities. Over the next 2 years, we plan to increase the
number of venues across all localities in Lanarkshire. 
41

Page 358

24 
4.4 Developing the Workforce 
Staff Health and Wellbeing Strategy 
What has been done in the last two years?
 ‘Your Health Matters- Your Opinion Counts’ Staff Engagement Programme-
implemented in April 2022 to allow staff the opportunity of reporting on  
what helped them manage their health and wellbeing during the previous 12
months. This platform also encouraged staff to consider what supports they
would want to have in place going forward and to inform the Staff Health
and Wellbeing (SHWB) strategy.
 The SHWB Strategy launched in November 2022 as a platform to ensure
good health and wellbeing is at the core of the organisation and is
everyone’s responsibility.
 https://www.NHS Lanarkshireanarkshire.scot.nhs.uk/download/staff-health-
wellbeing-
strategy/?wpdmdl=48788&refresh=639c6bc22e62e1671195586&ind=16679
07541132&filename=Staff-HWb-Strategy-A4_online_v3-1.pdf
 SHWB week (31 October – 4 November 2022) -the week was implemented
to further support staff to manage their health and wellbeing and also
offered a platform to launch the NHS Lanarkshire Staff Health and
Wellbeing Strategy (2022-2025). 
What difference have these made?
The findings from the Staff Engagement Programme contributed to the sessions
that were implemented as part of SHWB week as well as informing the content of
the SHWB strategy.
The SHWB Strategy outcomes will be reviewed in 12 months. The measures that
are being monitored over the next year are:
 iMatter / Referrals to support services (Salus Staff Support, Staff Care and
Wellbeing and Psychological Staff Support Service)/Workforce data. 
42

Page 359

25 
 Attrition rates/Supplementary staffing/ Staff Engagement opportunities
collating both quantitative and qualitative feedback from staff on their
perception of staff health and wellbeing.
 ‘Your Health Matters –Your Opinion Counts’ engagement programme/Town
Hall (virtual) Staff Health and Wellbeing week/Safety Culture Cards/Your
Health Matters webpage analytics.
Evaluation of SHWB week is being finalised and will be circulated early 2023.
How will outcomes be sustained?
Outcomes will be reported to the SHWB Strategic group for discussion and review.
What challenges remain?
 Continuing to engage with staff recognising that capacity to do this will have
limitations due to the current workforce climate.
 Consideration of different options to support staff to effectively manage their
own health and wellbeing where possible with a focus on the ‘harder to
reach’ staff groupings.
 The importance of staff health and wellbeing at work being a top priority for
NHS Lanarkshire senior leadership team and ensuring SHWB is everyone’s
responsibility.
What next? Anticipated actions for next 2 years
The Staff Health and Wellbeing Action plan is being drafted. 
It is anticipated that it will be approved by the SHWB Strategic group early in 2023. 
43

Page 360

26 
Employability 
What has been done in the last two years
NHS Lanarkshire has provided paid work placements, for six months as part of the
‘Kickstart’ programme, which is aimed at under 25 year olds to enable them to
build their transferable skill set, knowledge and confidence.
NHS Demonstrator Programme aimed at over 25 year olds who had been
unemployed for over 12 months, NHS Lanarkshire provided paid work placements
for 6 months to help build skills, knowledge and confidence.
Foundation Apprenticeships: Introduced Foundation Apprenticeships into the
organisation for Social Services & Health care and Business Skills, fifth year
school pupils have a work placement in NHS Lanarkshire one day a week during
the academic term, this helps them understand the workplace whilst completing
modules towards an apprenticeship.  This is an attraction tool to encourage these
young people to look at NHS as a career option.
What difference have these made?
In some cases, these opportunities have changed people’s lives by bringing them
into the workplace and supporting them to work independently and to be able to
bring more income into the home.
The Foundation Apprenticeship’s will help towards building a future workforce for
NHS Lanarkshire.
How will outcomes be sustained?
By continuing to engage with these types of programmes and committing to
funding the paid aspect of the programmes.
By having an infrastructure in place to support such activity.
What challenges remain? 
44

Page 361

27 
Funding for infrastructure has now been confirmed for 2 years.  However, funding
from Board/SG for paid placements for those furthest form the job market is still to
be secured.  Also, commitment from service to recruit Modern Apprentices  
What next? Anticipated actions for next 2 years
We plan on developing a Modern Apprenticeship Programme to attract more
young people to work in NHS.  There would also be a lot more school activity to
attract young people to the NHS and assist with future workforce planning. 
International Recruitment 
What has been done in the last two years
Scottish Government devolved responsibility to the territorial boards to recruit
Nursing, Midwives and Allied Health Professionals (NMAHP) with targets set for
2021/22, 2022/23. We recruited an International Recruitment Manager and
administration support for this area of work.  In addition, 1.6 whole time equivalent
practice education facilitators were recruited to support the nurses through the
Objective Structured Clinical Exam (OSCE) training required to join the Nursing
and Midwifery Council register.
To date latest numbers as January 30 Adult nurses,1 Physiotherapist and 1
Radiographer have joined NHS Lanarkshire. 
We are expecting The next cohorts will arrive in April and July 2023. Pastoral
support has also been put into place for these individuals.
What difference have these made?
An intense training programme has been put in place to support the nurses to pass
their OSCE (100% pass required).  To date everyone has passed and we are
currently waiting December 22 results.
These Nursing, Midwifery and Allied Health Professionals have been able to fill
vacancies across our Acute sites.
45

Page 362

28 
How will outcomes be sustained?
These outcomes will be sustained by ensuring we keep these individuals in post
and provide support when required as we would do with any other staff member.
What challenges remain?
Part of the package is to provide 12 weeks’ accommodation for these individuals to
settle in when they arrive whilst they are preparing to pass OSCE training.  NHS
Lanarkshire have limited access to accommodation provision.  If we had more we
could recruit more International Nurses, Midwives and Allied Health Professionals
to help relieve further vacancy pressures on the organisation. The funding
package would also need to be available to support them arriving into Scotland.  
What next? Anticipated actions for next 2 years
Review the projected workforce gaps and determine where International
recruitment could be of benefit, then consider the funding and infrastructure
required to support this. Whilst this has been a focussed piece of work lead by
Scottish Government, International recruitment has always existed within NHS
Lanarkshire most apparent within the medical job family. 
Leadership and Management Development,
Organisational Development 
What has been done in the last two years?
We have actively targeted members of the staff equality networks to raise
awareness of and encourage applications to leadership programmes and sessions
offered by NHS Lanarkshire. This was delivered through the Organisational
46

Page 363

29 
Development Leadership training team presenting at EMEN meetings and through
targeted articles in EMEN newsletters.  
Current Leadership programmes:
 The 6 Critical Practices for Leading a Team - This programme has been
designed to assist new Managers to help them excel in tough and
demanding roles. It contains a collection of carefully selected content
focusing on mind-set, skills and tools to provide new Managers with
relevant and practical resources to use day to day.
 The 7 Habits of Highly Effective People - This programme equips existing
Managers with the skills, knowledge and behaviours necessary to cope with
leadership challenges and empower them to lead with character and
integrity. This leadership programme is unique in that it is not just about
what leaders do but also about who leaders are. 
 The 4 Essential Roles of Leadership - This programme is aimed at Senior
Managers and explores the four essential roles of leaders: Inspiring Trust,
Create Vision, Execute Strategy and Coach Potential, which lay the
foundation for effective leadership. 
Leadership programmes are further supported by: 
 ‘Leadership Thinking Newsletter’ NHS Lanarkshire’s monthly newsletter
directing leaders to handpicked materials designed to challenge leadership
thinking on a range of relevant topics such as Resilience as A Leader,
Managing Wellbeing as A Leader, Collaborative Leadership, Psychological
Safety plus more.
 Leadership Thinking Lunchtime Club Monthly sessions focus on different
aspects of Leadership and encourages participants to share their ideas and
best practice. Group discussions focus on the monthly newsletter containing
materials on ‘Something to read, something to do and something to watch’
leadership content. 
What difference have these made?
The number of people who have accessed our learning and organisational
development offerings from the EMEN and LGBT+ staff networks has been noted
by those managing our programmes.
Participants from all programmes and sessions have provided feedback on the
impact our leadership programmes had on their work and personal lives.  
The Leadership Thinking Lunchtime Club has been facilitated to embed inclusion
through the use of diversity scenarios in learning activities which has resulted in
positive feedback received from attendees.
47

Page 364

30 
How will outcomes be sustained?
We will continue to promote learning and organisational development programmes
through the staff equality networks and will analyse feedback to ensure these
programmes meet the needs of our staff members to enhance their leadership and
management skills. 
Future learning and development course development will have a ‘golden thread’
of equality, diversity and inclusion interwoven to ensure scenario based exercises,
case studies and discussions are inclusive of minority communities and those with
protected characteristics, and equalities are embedded across all learning. 
What challenges remain?
Encouraging awareness of, application to and attendance of under-represented
minority groups at learning and organisational development offerings may present
a challenge as promotion is mainly through our staff equality networks and their
newsletters. Those who are not part of these networks may be missed so we will
continue to adapt how we promote opportunities to staff from under-represented
groups in response to emerging knowledge and feedback.
What next? Anticipated actions for next 2 years
Protected characteristics of attendees are not recorded in Learning and
Organisational Development but more detailed information on the demographics of
all staff attending training is available in the workforce data later in this report
which will enable us to compare data every two years.
We will continue to work with all staff groups to encourage participation and use
feedback to ensure these programmes meet the needs of our staff members to
enhance their leadership and management skills through measurable outcomes. 
48

Page 365

31 
5. Equality Outcomes 
The Equality Act 2010 (Specific Duties) (Scotland) Regulations 2012 stipulated that
all Health Boards across NHS Scotland were required to develop and publish a set
of equality outcomes to further one or more of the three needs of the Public Sector
Equality Duty (PSED). The purpose of the specific duties in Scotland is to help public
bodies, such as NHS Lanarkshire, in their performance of the PSED.
Due, to service pressures and limitations brought on by the Covid-19 pandemic NHS
Lanarkshire only developed and published two Equality Outcomes in 2021, with a
commitment to publish new equality outcomes in 2023. 
The Equality Outcomes published in 2021 were:    
 Equality Outcome 1: Near Me:  To provide an alternative method of patient
care that increases the ease of access for all patients in Lanarkshire.
 Equality Outcome 2: Staff Equality Networks: To provide a safe and
supportive environment for staff to discuss issues relating to a particular
protected characteristic.
The two-year update on the progress on these outcomes are documented below.  
As part of development of NHS Lanarkshire’s Equality Strategy 2021-25 two further
Equality Outcomes were developed are being published to complement existing
ones in 2023. These are 
 Equality Outcome 3: Healthcare needs assessment of resettled populations in
Lanarkshire: In partnership with public health and other key partners, design
and undertake a holistic Health Needs Assessment (HNA) of the resettled
population in Lanarkshire in order to inform a plan of health care delivery and
health improvement.
 Equality Outcome 4: Greenspace and biodiversity: To protect, preserve, and
enhance NHS Lanarkshire greenspace and ensure it is biodiverse and
accessible to staff, service users, and the wider community. 
49

Page 366

32 
5.1 Equality Outcomes 1 & 2: Update Reports. April to December
2022 
Equality Outcome 1: Near Me 
What has been done in the last two years?
Near Me is NHS Scotland’s secure video consultation solution enabling patients,
families and/or carers to have the option of virtual appointments with NHS
Lanarkshire clinicians. 
During the COVID-19 pandemic services were unable to provide face to face
consultations and there was a rapid rollout of Near Me across NHS Lanarkshire.
The number of Near Me consultations in NHS Lanarkshire reached a peak of
10,235 consultations in March 2021 at the height of the pandemic however as
services entered recovery phase usage has decreased to an average of 3,500
consultations in 2022. In total 185,800 Near Me video consultations took place
between March 2020 – November 2022. 
YouTube Link: https://youtu.be/L7-20V0gyHM   
Near Me has been used across Primary, Secondary, Mental Health, Social Work
and Third Sector organisations to sustain care and support to patients. Psychology
and mental health are the biggest users of Near Me in NHS Lanarkshire with
34,000 individual consultations carried out in 2021. This decreased to 24,000
individual consultations in 2022 to November 2022 however these services also
carried out 1000 group consultations with a total of 3,800 participants in this time
period. 
Information leaflets for callers have been translated into 31 languages.
What difference have these made?
Benefits identified by patients during Near Me end of call survey with 24,500
respondents Dec 2021-Oct 2022:
 Don’t have to travel to appointments.
 Saved time and money.
 Less chance of infection.
50

Page 367

33 
 Don’t have to take so much time off work or change my usual activities.
 Feel more relaxed and find it easier to explain my situation.
 Improved access to services.
 Easier to have relative or carer join the consultation. 
How will outcomes be sustained?
 Community Near Me resources will be set up in third sector and community
facilities across Lanarkshire. These Near Me resources will be bookable,
free of charge, private spaces supported by the resource staff.
 The Technology Enabled Care team will: 
- monitor the number of Near Me consultations and patient evaluations
monthly and support services to increase usage.
- provide on-going Near Me training for staff in a range of formats
including in person, MS Teams and online and 
- increase public awareness of Near Me by in person information
sessions, social media, public facing websites. 
What challenges remain? 
Challenges identified by survey of 26 clinicians from 5 specialties in University
Hospital Monklands (2022):
 Clinician preference on consultation type.
 Uncertainty about when video consultations should be used.
 Clinician perception that patients prefer face to face or telephone
consultations.
 No suitable private space for consultation.
 Don’t have suitable equipment or Wi-Fi connection.
 Perception that patients don’t have suitable digital devices or connectivity. 
What next? Anticipated actions for next 2 years
Priorities:
 Work with services to identify opportunities to embed Near Me into service
design.
 Digital inclusion: work with third sector organisations and other community
resources to develop a network of community Near Me facilities.
 On-going training and education for staff and patients.
 Work with interpretation service and national TEC team to identify the
number of video consultations using interpretation and BSL interpretation
support. 
Work with interpretation service to review available information and resources to
ensure it is accessible to the widest range of citizens. 
51

Page 368

34 
Equality Outcome 2: Staff Equality Networks. 
What has been done in the last two years
In response national guidance, NHS Lanarkshire has established three staff
networks o provide a safe and supportive environment for staff to discuss issues
relating to a particular protected characteristic which are at various stages in their
development:
 Ethnic Minority Employee Network (EMEN).
 LGBT+ network.
 Disability network.
What difference have these made?
Ethnic Minority Employee Network (EMEN):                     
The EMEN was launched in February 2021 and currently has 335 members.
It provides a space where staff from ethnic minorities are able to discuss issues
they face and identify network actions that can be taken to address these or link
into appropriate directorates to support them.
EMEN meetings are held quarterly with an average of 30-40 members in
attendance.
Over the last two years, 16 speakers have been invited to speak on issues
pertinent or of interest to the members, speakers have included:
 Neena Mahal, previous Chair of NHS Lanarkshire on ‘Her leadership
journey as an Ethnic Minority (EM) woman’.
 Lesley McDonald, NHS Lanarkshire Board Whistleblowing Champion.
 NHS Lanarkshire Quality Directorate – reporting racist and other hate crime
incidents against staff.
 British Medical Association (BMA) – experience of racism by BMA ethnic
minority members survey results. 
To maintain on-going engagement with members unable to attend meetings,
EMEN has published 4 newsletters which reflect key activities and areas of focus
for the network.
52

Page 369

35 
The EMEN has also been accessed as a consultation platform for a number of
projects which include:
 Staff health and wellbeing strategy.
 Datix (motivated incidents against staff) reporting.
 Digital Strategy.
 International Nurse Recruitment.
 International Medical Graduate mentorship. 
The EMEN was central to promotion and distribution of the NHS Scotland inclusive
pride badge, highlighting EM and LGBT+ intersectionality, which saw almost 2,000
badges distributed amongst staff.
Lesbian, Gay, Bisexual, Transgender Plus (LGBT+) Network:   
The LGBT+ network was launched in February 2022 and currently has 43
members.
Its executive committee was agreed in November 2022 and it is anticipated that
this vital step will generate momentum in forming an action plan.
The LGBT+ network has hosted a number of speakers including:
 NHS Lanarkshire Board Whistleblowing Champion.
 Equality and Diversity Team on ‘Active Bystander’ programme.
 NHS Lanarkshire Quality strategy engagement. 
 This highlights the collective focus of the individual networks and how key
drivers are intersectional across the protected groups. 
Tabled agenda items included the use of gender pronouns in electronic signatures,
promoting network membership, NHS Scotland inclusive pride badges and
recognising key LGBT+ calendar dates.
In addition, the network has connected with the Scottish LGBTI Police Association
to share best practice and learning and it is hoped that it will link with wider NHS
LGBT+ networks as it develops.
Disability Network 
53

Page 370

36 
The Disability network was launched on 31st October 2022. 
The network was established following a staff survey which received 115
responses and overwhelmingly confirmed the desire for a disability network which
currently has 86 members.
Network meetings will be held quarterly and it is hoped an executive committee will
be established in the early part of 2023.
How will outcomes be sustained?
Network Support
 NHS Lanarkshire has named Board and Corporate Leads to support and
champion the networks.
 Evidenced its support for Employee networks with a creation of a post to
support the establishment of new networks, their co-ordination and ongoing
work.  
 The employee networks are a part of NHS Lanarkshire’s Equality Strategy
2021-25.
 Network Executive groups are supported by the Organisational learning and
development team with sessions to enable effective team working and
planning.   
 NHS Lanarkshire Senior Team have agreed protected time allocated for
employees to attend network meetings identifying that they be members of
more than one group.  
 They have also agreed protected time for network executive group
members to attend committee meetings and key actions.
 Named contacts have been identified in key employment/support areas:
Human Resources and Occupational Health. 
Action Plans
EMEN has a robust 3-year action plan (2021-24) that supports its work and
identifies future development areas and direction. The action plan is steered by
NHS Lanarkshire’s statutory obligations under The Equality Act 2010. The action
plan has been shared with a number of Boards across Scotland and has been
recognised as an exemplar of good practice and will be used as a basis for the
action plans of our other networks.
The LGBT+ & Disability staff networks will be supported to develop and
implemented their actions respectively.
Consultation
The employee networks have been identified as key consultation groups and have
already been accessed to gather feedback on a number of key NHSL strategies
54

Page 371

37 
and policies. The Networks will continue to be platforms for local and national
consultations.  
Wider Networks
The work of the EMEN extends outside of geographical boundaries as its Chair
and vice-chair are members of the Scottish Government National Ethnic Minority
Forum influencing National strategies and practice.
The post which supports NHS Lanarkshire employee networks is a member of the
national NHS Staff Networks Co-ordinators group – to support sharing of good
practice and resources. 
It is anticipated that LGBT+ and Disability network chairs will sit on emerging
National forums.
What challenges remain? 
 Workforce and organisational pressures directly impact ability of members
to attend the networks but the Board’s continuing support of the networks is
seen as a positive driver. 
 Engagement with members unable to attend meetings has already been
identified as a challenge however the EMEN produces regular newsletters
to keep its members informed, share ambitions, opportunities and
outcomes. 
 Building staff trust in effectiveness of networks and benefits of membership
will continue to be a challenge – this has been particularly identified as a
key challenge across all networks. 
 Encouraging membership, engagement and attendance to network
meetings will be an on-going challenge. However, evidence that the
networks have a positive influence on workplace culture, inclusion and
recognition will hopefully address these.
 Changing local and national priorities/landscape may affect how the
networks are view, respected and appreciated but we are confident NHS
Lanarkshire is an exemplar for driving forward the equalities agenda and
will address and challenge these as these change.
What next? Anticipated actions for next 2 years 
 On-going development of the staff networks is a key action for the Equality
and Diversity Team, with additional support for the newer LGBT+ and
Disability networks.
 It is envisioned that all three networks executive groups will begin working
collectively in identifying shared/intersectional outcomes as they evolve and
strengthen. 
55

Page 372

38 
 It is anticipated that all the networks will initially produce their own
newsletters but it is anticipated that these will come together as a joint multi-
networks newsletter which reflects key activities and areas of focus.
 We will continue promotion of the networks to all staff through staff
communication channels.  
 Continued membership of the National Ethnic Minority Forum by the EMEN
Chair and the LGBT+ and Disability Network Chairs will join any new
National forums. 
5.2 NHS Lanarkshire Equality Outcomes 2023 – 2025 
Equality Outcome 3: Healthcare needs assessment of resettled
populations in Lanarkshire - In partnership with health
Improvement and other key partners, design and undertake a holistic
Health Needs Assessment (HNA) of the resettled population in
Lanarkshire in order to inform a plan of health care delivery and
health improvement. 
If working in partnership outline which organisation this outcome is for. 
NHS  Local
Authority 
H&SC Partnership 
Third Sector  College /
University 
Other 
Please state:
Other Community
Planning Partners 
x x  x 
x  x 
56

Page 373

39 
The aspects of the General Duty met:
 Eliminate unlawful discrimination, harassment and victimisation.
 Advance equality of opportunity.
 Foster good relations between people. 
Protected Characteristic covered: Age, race, religion or belief, gender
reassignment, disability, pregnancy/maternity, sex and sexual orientation. 
Context and Evidence: 
The UK Government has made a commitment to resettle refugees from various
countries via the United Kingdom Resettlement Scheme (UKRS), and to provide
Afghan Locally Employed Staff (LES) and their families with resettlement in the
UK. The Scottish Government (SG) in conjunction with COSLA has made a
continued commitment to support the UKRS, resettle some of the Afghan
families and to take a proportionate number of the UASC. 
In response to the crisis in Ukraine, the SG and COSLA have indicated their
commitment to support Ukrainian people coming in to live with relatives and
friends, via the Homes for Ukraine scheme or The Scotland Super Sponsor
scheme. 
In December 2021 the Home Office and MEARS established an emergency
contingency accommodation for single male asylum seekers at an hotel in East
Kilbride. The UK Government has recently indicated that as part of the widening
Asylum Dispersal Strategy, most areas in the UK will be expected to participate
in supporting the arrivals and integration of people seeking asylum. 
In summary the current situation is that there are various groups of people
coming to settle in Lanarkshire, who will require healthcare and support. 
Resettlement is an evolving picture and as well as having a response team to
quickly mobilise and coordinate activity in support of the health and social care
needs of resettlement cohorts residing and arriving, a population health
programme is also required to reduce health inequalities and improve health
and wellbeing in the medium and longer-term.
In partnership with public health and other key partners, a holistic Health Needs
Assessment (HNA) of the resettled population in Lanarkshire (recognising that
this is not static) will be designed and undertaken in order to inform a plan of
health care delivery and health improvement.
The HNA will be utilised to inform the development and implementation of a
Lanarkshire Resettlement Population Health Plan incorporating health care,
public health and health improvement activity which responds to the varying
health needs of this heterogeneous population.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            
57

Page 374

40 
Why are you setting this outcome? 
1. To deliver on the UK Government’s Home Office Resettlement Policy and
associated schemes.
2. To ensure that Lanarkshire’s Resettlement Population have access to
appropriate healthcare and support that optimises their health and
wellbeing potential.
3. To reduce an escalation of ill health through prevention programmes that
respond to the needs of varying cohorts of settled or incoming people.
4. To mitigate against the impact of health inequalities for the resettled
population.
To inform prioritisation of Public Health, Healthcare and Health Improvement
activity and use of multi-agency resources. 
Measures/Indicators: 
1. Fund and recruit a Senior Health Promotion Officer for the Resettlement
Programme.
2. A HNA Steering Group with all key partner stakeholders established with
terms of reference.
3. HNA tool identified and tailored.
4. HNA undertaken, report written and disseminated.
Evidence of recommendations and actions progressed.
Lead Area: Health Improvement
Link to Local and National Priorities: 
https://www.gov.uk/government/publications/resettlement-policy-statement
https://www.gov.uk/guidance/afghan-citizens-resettlement-scheme
Link to local and national priorities: Scottish Government: Everyone Matters: 2020
Vision; Workforce Framework; Implementation Plan 
58

Page 375

41 
Equality Outcome 4: Greenspace and biodiversity - Protect,
preserve, and enhance NHS Lanarkshire greenspace and ensure it
is biodiverse and accessible to staff, service users, and the wider
community. 
If working in partnership outline which organisation this outcome is for. 
NHS  Local
Authority 
H&SC Partnership 
Third Sector  College /
University 
Other 
Please state: 
The aspects of the General Duty met:
 Advance equality of opportunity.
 Foster good relations between people. 
Protected Characteristic covered: Age, race, religion or belief, gender
reassignment, disability, pregnancy/maternity, sex and sexual orientation. 
Context and Evidence: 
There is a growing threat to public health from the current climate crisis.  If left
unabated, these impacts will have negative consequences for the health and
wellbeing of our communities, with those from more deprived communities most
at risk and more likely to suffer health consequences.
We recognise that we can positively contribute to local areas in many ways
beyond providing healthcare.  NHS Lanarkshire’s estate provides diverse
greenspace resources for both people and wildlife and these natural
environments form the foundation of a healthy environment. 
Our outdoor estate is a valuable and under-used asset. If planned and managed
well, it can make a significant contribution to the physical and mental health and
wellbeing of our staff, patients, visitors and local communities.   
The Lanarkshire Green Health Partnership (LGHP) was formed in April 2018
and is helping to connect health & social care with nature. Lanarkshire is rich in
greenspace, parks and nature but this has historically been an underused asset.
We are aiming to raise awareness and confidence of the workforce and
community to access, promote and utilise our green health spaces.  
x  
59

Page 376

42 
Additionally, the LGPH is supporting work to increase active travel opportunities
by improving the infrastructure within our sites to support this.   
We have already had successes in this area over the last year and have:
 Introduced therapeutic gardening sessions for our patients across a
number of sites.
 A number of participants in the programme were supported to achieve
the John Muir Discovery Award. 
 Food growing programme introduced in University Hospital Hairmyres.
 Donations of food harvested were donated to Clydesdale food bank.
 Delivered secure cycle parking units on some sites.
 Loaned bikes and e bikes to staff for active commuting.  
 Promotion of health walks through ‘Get Lanarkshire Walking’
Why are you setting this outcome? 
A key aim of the Lanarkshire Green Health Partnership is to enhance the NHS
estates to offer therapeutic spaces for hospital inpatients, outpatients and
community volunteers by providing growing sessions (led by a third sector
organisation - Clydesdale Community Initiatives). This not only helps to facilitate
health and wellbeing outcomes for the individuals but also increases biodiversity
to the greenspaces. 
 Improves the health and wellbeing of user groups:
o Enhanced physical and mental health.
o Increased social connectivity.
o Improved aspirations.
o Improved employment/voluntary opportunities. 
 Innovative volunteering:
o Affords individuals who would not normally be able to access
regular volunteering with opportunities as part of their treatment
pathway.
o Improved physical activity levels.
Measures/Indicators:  
 Increased use of estate by patients, staff and visitors.
 Established connections between the NHS estate, community
greenspaces and wider green networks.
 Increased awareness for the benefits and opportunities of increasing
greenspace and biodiversity.
 Deliver opportunities for volunteering and development. 
 Greenspace management plan developed.
60

Page 377

43 
 Greenspace design and practice incorporated into new buildings,
refurbishment programmes and programmes of work for estates teams.
These will be monitored through:
 Annual biodiversity audit.
 Reporting progress through National Sustainability Assessment Tool and
the Public Sector Climate Change Duties Report.
 Staff Surveys. 
Lead Area:   Lanarkshire Green Health Partnership. 
Link to Local and National Priorities: 
This area of work links with:
NHS Lanarkshire:
 Corporate Objectives. 
 Sustainability and Climate Change Strategy.
 Pillar underpinning the development of the Boards Clinical Strategy ‘Our
Health Together’.
National:
 Direct Letter (2021) 38 – A policy for NHS Scotland on the Climate
Emergency and Sustainable Development. 
 NHS Scotland climate emergency and sustainability strategy: 2022-2026.
 International: UN Sustainable Development Goals. 
61

Page 378

44 
6. NHS Lanarkshire Board Diversity Data 
The table below outlines the number of men and women who are currently members
of Lanarkshire NHS Board (as at December 2022)   
 Executive Directors of the NHS Board are appointed to the NHS Board by
virtue of their positions as: Chief Executive; Director of Finance; Executive
Medical Director; Executive Nurse Director; Director of Public Health 
 Two Non-Executive Directors are appointed to the NHS Board by virtue of
their positions as Chair of the Area Clinical Forum and as Employee Director /
Chair of the Area Partnership Forum 
 Two non-Executive Directors are nominated by the Local Authorities to serve
on the NHS Board 
 The remaining eight non-Executive Directors (including the Chair) were
appointed through a national recruitment process overseen by the Scottish
Government Public Appointments Unit 
Female              % Male                  % Total Members
December 2022 n=9 (47%) n=11 (53%) 20 
The gender composition of the 11 Publicly Appointed Non-Executive Directors of the
Board (including the Chair) at February 2023 is 3 females (27%) and 8 males (73%).    
62

Page 379

45 
7. Workforce Data   
Data definition 
Due to the nature of reporting, and the differing systems used, there are variances on
the equal opportunities monitoring data presented in terms of the percentage (%) of
the workforce cohort being analysed, as relative denominators will vary, as follows:
 Overall workforce characteristics – data reflects all substantive staff employed
as at 31st December 2022 (excluding bank staff);
 Training – data reflects all learning opportunities undertaken in the calendar
year 2022;
 Leavers – data reflects all substantive post holders who left during the calendar
year 2022;
 Recruitment – data reflects all applicants (for substantive and bank posts)
during the calendar year 2022; and
 Employee relations – data reflects all conduct cases during the calendar year
2022.
Presentation of the data
The data is presented in six distinct sections: 
7.1 Workforce characteristics;
7.2 Training;
7.3 Leavers;
7.4 Recruitment;
7.5 Employee relations; and
7.6 Equal Pay Analysis
63

Page 380

46 
Each section provides detail on sex; disability; ethnic group, age; and sexual
orientation.
The denominator relative to the subject area is detailed at the top of the page of each
respective section.
Data within the recruitment section details the proportions of staff that applied, were
interviewed and subsequently were identified as preferred candidates and this is
presented in a table format for all characteristics. 
7.1  Workforce characteristics as at 31st December 2022: total headcount of 13,962 
Sex of the workforce %. 
64

Page 381

47 
Sexual orientation of the workforce %. 
Disability declared % of the workforce. 
65

Page 382

48 
Age Profile % of the workforce. 
Ethnicity of the workforce %. 
66

Page 383

49 
Religion/Beliefs of the workforce %. 
67.7%
5.2%
0.2%
0.2%
23.7%
0.1%
2.3%
0.6%
0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0%
White
Prefer not to say
Other
Mixed
Information Not Held
Caribbean or Black
Asian
African
Ethnicity % (Aggregated) of Workforce (Headcount)
67

Page 384

50 
7.2 Training. 1/1/2022 to 31/12/2022, all training opportunities (inclusive of both face
to face and eLearning packages) undertaken by staff: training opportunities = 179,666 
Sex %. 
Sexual Orientation %. 
68

Page 385

51 
Ethnicity %. 
Disability %. 
69

Page 386

52 
Religion/Belief %. 
Age of Workforce %. 
70

Page 387

53 
7.3 Leavers 1/1/2022 to 31/12/2022: total headcount = 2,087 
Sex of Leavers %. 
Sexual Orientation of Leavers %. 
71

Page 388

54 
Ethnicity of Leavers %. 
Religion/belief of Leavers %. 
72

Page 389

55 
Age Profile of Leavers %. 
7.4 Recruitment. 1/1/2022 to 31/12/2022: 26,260 applications, 7,131 interviewed,
4,901 preferred candidates 
Sex.
Sex Applicant Interviewed Preferred candidate
In another way 0.4% 0.4% 0.5%
Female 68.1% 77.3% 80.2%
Male 27.4% 18.7% 16.6%
Information not held 3.9% 3.6% 2.6%
Prefer not to say 0.2% 0.1% 0.0% 
Disability.
Disability Applicant Interviewed Preferred candidate
Yes 2.3% 2.9% 2.2%
No 93.8% 93.5% 95.1%
Information not held 3.9% 3.6% 2.6%
73

Page 390

56 
Religion.
Religion Applicant Interviewed Preferred candidate
Buddhist 0.4% 0.3% 0.2%
Christian - other 33.1% 16.1% 10.2%
Church of Scotland 6.7% 13.3% 12.3%
Information not held 4.6% 4.6% 3.8%
Hindu 2.9% 1.1% 1.1%
Jewish 0.0% 0.1% 0.0%
Muslim 11.1% 4.2% 3.2%
No Religion 23.3% 36.4% 43.4%
Other 0.9% 1.1% 1.0%
Prefer not to say 2.4% 3.9% 4.0%
Roman Catholic 14.3% 18.6% 20.6%
Sikh 0.3% 0.3% 0.1% 
Sexual Orientation.
Sexual Orientation Applicant Interviewed Preferred candidate
Bisexual 3.1% 2.0% 2.0%
Information not held 4.3% 3.7% 2.8%
Gay/Lesbian 1.8% 2.5% 2.7%
Heterosexual 85.8% 87.6% 87.8%
Other  1.6% 1.0% 0.8%
Prefer not to say 3.3% 3.2% 3.9% 
Ethnicity.
Ethnicity  Applicant Interviewed Preferred
candidate
African – African, African Scottish or
African British
15.2% 5.5% 1.7%
African - Other 19.7% 5.2% 1.0%
Asian – Bangladeshi, Bangladeshi
Scottish, Bangladeshi British
0.3% 0.1% 0.1%
74

Page 391

57 
Ethnicity continued Applicant Interviewed Preferred
candidate
Asian – Chinese, Chinese Scottish,
Chinese British
0.3% 0.2% 0.4%
Asian - Other  5.4% 3.1% 2.5%
Asian – Bangladeshi, Bangladeshi
Scottish, Bangladeshi British
1.6% 0.9% 0.7%
Asian – Pakistani, Pakistani Scottish,
Pakistani British
5.5% 2.6% 2.1%
Caribbean or Black – Black, Black
Scottish, Black British
0.1% 0.0% 0.0%
Caribbean or Black – Caribbean,
Caribbean Scottish, Caribbean British
0.0% 0.1% 0.1%
Caribbean or Black – Other 0.1% 0.0% 0.0%
Mixed or Multiple Ethnic Group 0.5% 0.5% 0.6%
Information not held 3.9% 3.6% 2.6%
Other Ethnic Group – Arab, Arab
Scottish, Arab British
1.3% 1.1% 0.9%
Other Ethnic Group – Other 0.4% 0.2% 0.1%
Prefer not to say 0.6% 0.6% 0.7%
White – Gypsy Traveller 0.0% 0.0% 0.0%
White – Irish 0.5% 0.9% 1.1%
White – Other 2.1% 2.0% 2.0%
White – Other British 3.7% 6.8% 6.8%
White - Polish 0.4% 0.6% 0.6%
White - Scottish 38.5% 66.1% 75.8% 
75

Page 392

58 
7.5 Employee relations conduct cases 1/1/2022 to 31/12/2022: 67 cases 
Sex. 
Disability. 
76

Page 393

59 
Religion. 
Sexual Orientation. 
77

Page 394

60 
Age Profile. 
Ethnicity. 
78

Page 395

61 
7.6 Equal Pay Analysis 
The data utilised is as at 31st December 2022 for all tables.
The data presented covers all substantively employed staff and the average hourly rate of basic pay i.e. excluding overtime.
Note:
 Comparison is on the basis of average pay for males and females (excluding overtime) for the cohort detailed by row.
 A positive percentage indicates a pay gap with males being paid more than females.
 A negative (-) prefixed percentage indicates that there is a pay gap with females being paid more than males. 
Job Family F-GC F-GC as %
of JF Total
Average
BHR (F)
M-GC M-GC as %
of JF Total
Average
BHR (M)
BHR
variance (£)
BHR 
Variance (%)
Total
Agenda for
Change Staff
11,341 87 17.50 1,681 13 17.50  0.00 0 17.56
Medical and
Dental Staff
443 50 44.48 448 50 45.81 1.33 3 45.15
Senior Manager 26 53 38.25 23 47 30.92 -7.33 -24 34.81
Total for
Organisation
11,810 85 18.56 2,152 15% 23.87 5.31 22 19.38 
F-GC = Female Gender Count.
M-GC = Male Gender Count.
JF = Job Family.
BHR = Basic Hourly Rate.
BHR variance (£) = Variance in £s of hourly rate for male vs. female.
BHR variance (%) = BHR variance / average M-BHR.
79

Page 396

62 
8.   Procurement 
NHS Lanarkshire continues to ensure equality is mainstreamed into our procurement
processes including:
 Carrying out public procurement, and mainstreaming the general equality duty
through use of the Scottish Government’s Single Procurement Document,
which is used as a template for the selection of suppliers including Equality
and Diversity.
 In developing methodologies and strategies for the procurement of goods,
works and services, NHS Lanarkshire ensures that it gives due regard to all of
its duties under the Equality Act and pursuant Regulations, and considers how
inequalities of outcome caused by socio-economic disadvantage may be
reduced through the conduct of procurement processes.
 NHS Lanarkshire seeks to use collaborative contracts and frameworks where
possible in order to help achieve its equality aims. An example of where
equality and diversity is promoted is the NHS Scotland uniforms contract
which was awarded to Dimensions UK Ltd. Part of the contract is
subcontracted to Haven PTS, a Scottish based supported business where at
least 30% of employees are disabled or disadvantaged persons. 
NHS Lanarkshire continues to recognise that our
activities have an effect on the society in which
we work, and that developments in society affect
our ability to work successfully, and operates to  
a procurement strategy which is committed to
achieving environmental, social and economic
aims that tackle these effects. 
Our tendering activity has increased in recent years and the governance increased
through development of Standing Financial Instructions, Procurement Operating
Procedures and work instructions in line with the Public Procurement Reform
(Scotland) Act 2014 and Public Contracts (Scotland) Regulations 2015. This ensures
80

Page 397

63 
that the environmental, social, equality and diversity aspects of procurements are
addressed appropriately. 
NHS Lanarkshire also actively promote the use of national frameworks, as
mentioned above, and these have been awarded under the same procurement
regulation requirements. The use of contracts is mandated through the use of
electronic ordering from catalogues thus reducing off contract spend and maximising
the environmental, social and economic benefits achieved. 
9. Conclusion 
In this two-year update report we have given some examples of our progress over
the last two challenging years. In a post Covid-19 world we clearly recognise that
Equality and inequalities are no longer add-ons, but an integral part of everything
NHS Lanarkshire does. 
We continue to evidence the on-going commitment of the organisation’s leadership
and staff as advocates for change and endeavour to make systematic and targeted
changes that make a real difference.  
We hope we have shown our strong commitment to improving and changing the
experiences of our service users and staff in a meaningful and inclusive way.   
81

Page 398

1 
REPORT 
Item No: 13 
SUBJECT:  Performance Update – Quarter 4 (January – March 2023) 
TO:  Performance, Finance & Audit Committee
Lead Officer
for Report: 
Morag Dendy, Head of Planning, Performance and Quality
Assurance 
Author of
Report: 
Stephen Forrest, Performance Manager     
DATE:  21 June 2023 
1. PURPOSE OF REPORT 
1.1 This paper is coming to the Committee: 
For approval  For endorsement  To note 
1.2 The purpose of the report is to provide an update to the Committee on the areas for
improvement which have been identified as part of the Quarterly Performance Review for
the period 1 January 2023 to 31 March 2023 (Quarter 4). 
2. ROUTE TO THE BOARD 
2.1 This paper has been: 
Prepared By:      
Performance
Manager 
Reviewed By: 
Senior Manager,
Strategy &
Performance   
Endorsed By: 
3. RECOMMENDATIONS 
3.1 The Committee is asked to note the contents of the report and its appendix. 
4. BACKGROUND/SUMMARY OF KEY ISSUES 
4.1 The Chief Officer has joint quarterly performance review meetings with the Chief Executive
of NHS Lanarkshire and the Chief Executive of North Lanarkshire Council. These meetings
are supported by a Chief Executive Performance Framework comprising a range of
performance measures from across both health and social work systems, including
relevant targets and trajectories.

Page 399

2 
4.2 Based on a traffic-light system there are areas for improvement identified within the
performance framework each quarter for those that are flagged as Red or Amber. The
performance review meetings are used as a means for jointly agreeing corrective actions. 
5. AREAS FOR IMPROVEMENT 
5.1 The areas for improvement and corrective actions are attached as Appendix 1. 
6. CONCLUSIONS 
6.1 The areas for improvement identified in Appendix 1 are being progressed as a matter of
priority, and progress updates will be reported at future meetings of the Board and the
Performance, Finance & Audit Committee. 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES
The Chief Executive Performance Review process is structured in a way to allow
performance levels to be assessed against each of the 9 national outcomes. 
7.2 ASSOCIATED MEASURE(S) 
None 
7.3 FINANCIAL 
None 
7.4 PEOPLE 
None 
7.5 INEQUALITIES 
EQIA Completed: 
Yes  No  N/A 
8. BACKGROUND PAPERS 
None 
9. APPENDICES
Appendix One - Areas for Improvement (Quarter 4, January – March 2023) 
.............................................................................
CHIEF OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact Stephen
Forrest on telephone number 07810155410.

Page 400

3 
Appendix 1 – Areas for Improvement (Quarter 3, October - December 2022) 
1.  Alcohol Brief Interventions  Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Alcohol Brief Interventions (all settings)
NHSL
7381 n/a  647  -  
Narrative & Corrective Action 
As services within the HSCP/NHSL move toward the use of the Electronic Patient Recording (EPR) system MORSE, it is
suspected that the practice of routinely conducting and recording ABI may have decreased. It is also possible that there is some
inconsistent practice whilst the transition to MORSE is facilitated and teams are required to maintain dual EPR. The numbers
included within these reports include all interventions recorded via Morse and all manual returns which are entered via an Access
database. 
A steering group has been formed to facilitate the development of a SOP and devise a suitable training product for staff to
encourage the use and proper recording of ABI. The ABI Steering Group has agreed a new reporting structure and this has been
adopted. A highlight report has been made available to the steering group indicating services/teams that have low or no
interventions recorded. 
2.  Cervical Screening  Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status 
Cervical Screening Uptake  80% 72.9% 72.5%   
Narrative & Corrective Action 
The position remains similar to Q3. Work is ongoing to promote Cervical Cancer Screening Awareness Week in June. This
supports training being delivered in partnership with all sectors (NHSL/Locality Level) to promote cancer screening programmes
and early detection. An increase of 0.2 WTE for the Public Health Quality Improvement Facilitator offers some additional capacity
for the service to improve the current position.
Targeted campaign work is taking place to increase screening awareness and the uptake of cervical screening and HPV in the
lowest uptake areas (Bellshill and Airdrie) and also with specific populations in the community (SIMD 1&2). Cancer Screening
Workshops continue to be carried out with Lanarkshire Carers BAME group.

Page 401

4 
The Practice Cervical Screening Audit is now being conducted across the North Partnership, which involves GP Clinical Leads
and Quality Coordinators auditing the process in each practice to inform a briefing promoting best practice and recommending
improvements, where necessary. 
3.  Immunisations  Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Immunisations – % of 5 year olds   95% 92.7% 92.2%   
Narrative & Corrective Action 
Performance in Lanarkshire is reflective of a wider trend being experienced across Scotland where there is a gradual and slight
decline in uptake of immunisation. The decline in uptake appears more significant in 2022 when compared with previous years.

Page 402

5 
The data is being reviewed by colleagues in Public Health to identify any drivers of the decline, the potential implications and to
link these findings to Health Improvement work streams. Ongoing work to improve the position includes the use of media
campaigns, improved access to local clinics and better parent/carer contact prior to appointments. 
4.  6-8 Week Reviews  Target
2022/23
2022/23
Q2
2022/23
Q3
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Percentage of people who have completed
6-8 week review
90% 74.7% 69.5%   
Narrative & Corrective Action 
Performance remains below target and there is continued decline through 2022, resulting in a level of completion that is among
the lowest experienced in NHSCP. This performance metric and the associated risk is monitored by the North Health & Social
Work Managers, Associate Medical Director and Senior Nurse. 
Initial analysis of the underlying data has found a significant issue in the distribution of late and/or missed checks among a
relatively small group of practices. Further investigation and analysis is required to fully understand the proportionality of reviews
that were completed late and those were no assessment was carried out. Further investigation and analysis is also required to
also understand where the issue may relate to the non, or misreporting of reviews that have taken place as required. 
Initial analysis has been carried out by locality:

Page 403

6 
The monitoring and analysis is providing some intelligence on hotspots associated with GP Practices and Health Visitors. It should
be noted that there is a significant increase at 10 weeks, which could be relating to recording practice, or reviews out with 6-8-
week window. There is local practice and control measures in place to ensure reviews are carried out, however significant
variation in recording practice across the North HSCP make this a time consuming and inefficient task, as hard-copy forms have
to be physically located and checked against patient records. 
At a locality level, specific issues have been identified, such as individual practices storing and not returning forms and therefore
their data was not being captured. Changes have been made to improve returns and collections, however it is possible that such
practice may be more widespread and contributing to poor performance. The Local initiatives, such as that in Bellshill to
understand waiting times information from GP's has found that enough appointments are being offered and there are no waits for
those practices who do not participate in CHS; this is continually monitored by the locality to reduce the rate of breach. Further
initiatives are also in place in Bellshill, Motherwell and Wishaw to improve the quality of the assessment, reduce the level of
returns and improve engagement with GP practices 
A multi-disciplinary meeting has been called for the North HSCP to analyse and provide context to all of the underlying data,
gauge the clinical risk presented by the performance and to inform the planning of the corrective actions required. This
complements and supports ongoing recovery and improvement work within the wider service to understand the performance
across the Universal Pathway. Use of a digital platform is actively being investigated and would assist with recording practice and
operational management, although this is not expected to be live for some time. 
5.  Delayed Discharge / Home Support /
Reablement
Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Delayed discharge bed days - standard
delays 
31,796 
Q1 – 7184
Q2 – 8966
Q3 – 8166
Q4 – 7531
8,309 8,178   
Narrative & Corrective Action 
In Q4 of 2022/23 the delayed discharge performance continued to be significantly above target; 8178 bed days is 2328 days
above the target of 5850.
The “Fire Break” and associated Op Flow works are likely to have impacted and improved the Q4 position, with significant multi-
disciplinary work undertaken to improve patient flow during Q4. The longer-term impact of the continued work of Op Flow is not
known and will be quantified as part of the project evaluation.

Page 404

7 
There remains sustained pressure on services supporting discharge, with reduced capacity in Reablement services and
challenges with recruitment and retention to posts at all grades within Home Support. The level of turnover and difficulties with
recruitment of the roles Home Support Worker, Support Officer and Service Delivery Coordinators have placed significant strain
on supporting discharge as the North HSCP are experiencing some of the highest referral rates recorded – w/c 16th January, the
North partnership received 158 referrals (peak winter pre-pandemic average was 77). Sickness absence within the Home Support
workforce continues to impact on the capacity of the service to support timely discharge. 
Several improvement actions are in place to address the issues currently being experienced. Additional Healthcare Support
Workers are being recruited so that District Nursing Teams can enhance the care offering to those on both Home Support and
District Nursing caseloads, freeing up further Home Support capacity to concentrate on other cases. The service has also made
some amendments to the workforce model to offer additional review capacity, which will release capacity to the mainstream Home
Support service. Ongoing work is in place to develop the operating model for Reablement; to increase and protect capacity within
the service for dedicated Reablement and rehabilitation as key priorities. 
Local and national work continues to support improved performance in discharge, including further development of the PDD
process and the continued progress of the Discharge without Delay project. Local improvement work, including the development
and expansion of the Rapid Response, Home Assessment and Hospital at Home teams is expected to impact positively on DD
performance. 
6.  Reablement / Integrated Equipment &
Adaptation Service / Home Assessment
Team 
Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Reablement - Number Of People
Completing Reablement Process
2,000 (500
per quarter)  1049 1418   
Reablement - % Of New or Increased
Home Support Packages Which Are
Reablement
70% 55.0% 61.2%   
Reablement - % Of People With No or
Reduced Home Support Service Required
At End Of Process
70% 50.3% 56.1%   
IEAS - % Deliveries Achieved Within 7
Working Days  80% 63.4% 51.5%   
Narrative & Corrective Action

Page 405

8 
IEAS continues with a Programme of improvement works, with improvements to premises and focussed recruitment activity in
progress at the time of reporting. Sustained workforce challenges, specifically recruitment and retention of suitably skilled and
experienced IEAS staff have resulted in challenges with the delivery and uplift of equipment. 
Specific resources have been assigned to addressing outstanding uplifts within the areas of highest demand and this, alongside
other focussed activity has released pressure and some capacity in the system to address performance with timely deliveries. It
should be noted that whilst such services continue to support Delayed Discharge improvement works, such activity naturally
requires a reduced focus and capacity to support Community Services. The service is undertaking an exercise to self-assess their
performance, using Scottish Government baseline figures for Equipment/Adaptations. 
It is hoped that a more integrated Performance Framework can be developed for services in this area, showing how the services
complement and interact with each other, such as combined and/or complementary metrics for Reablement and the Home
Assessment Team (HAT). It is notable that whilst the percentage of Reablement Home Support packages is below target that the
HAT received increasingly more referrals. 
A Home Assessment Team Development Plan is in place to streamline and reduce duplication of service from the teams working
in this area. The dynamic between Integrated Rehabilitation, Hospital Social Work, Home Assessment Team and Reablement has
been recognised as allowing an opportunity to provide one seamless combined service. The development plan is currently
focussed on services to support discharge, however a second phase is planned looking at the interaction with Hospital at Home
and other services placed to support admission prevention and avoidance

Page 406

9 
Multi-disciplinary and multi-agency focus groups are planned to look at the available resources and patient/client pathways, which
will inform the implementation of the development plan. A governance framework has been developed to support this work, which
is overseen by the Home Support Programme Board. 
An Assistive Technology was implemented in February 2023 to support further innovation in this area and is actively working with
services across the North HSCP, including a trial of the KOMP system for medication prompts as an alternative to in-person visits.
At May 2023, the team have received 187 referrals and 57 of these have resulted in the supply/purchase of technology that has
benefitted the person in regaining independence in an area of their life; the impact on wider services will be quantified as the new
service is developed and then evaluated. 
7.  CAMHS Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
21 24
18 18
9
3
43
4 1
31
0
5
10
15
20
25
30
35
40
45
50

Page 407

10 
Percentage of patients commencing
treatment within 18 weeks of referral 90% 19.1% 28.7%   
Narrative & Corrective Action 
The introduction of the CAPA (The Choice and Partnership Approach) for Child and Adolescent Mental Health Service (CAMHS)
should see some improvement in managing the available capacity within the service. Consultant availability has been more
closely aligned to demand and the CAPA model allows for more patient input in how their appointments are managed, which
should also reduce wastage in the system. 
From 22nd August 2022 -16th April 2023, the waiting list initiative have offered an additional 1499 appointments, with 1099
attendances, 389 not brought, 7 patients transferred and 153 patients meaningfully redirected to other more appropriate supports. 
The waiting list for the Neurodevelopmental Service remains an issue for the service, however an increase in WTE, formal
induction process and completion of staff training and development has prompted some positive movement. Adoption of Trakcare
is also allowing for better monitoring of demand and capacity within the service, and will provide the evidence needed to build a
sustainable future service capable of meeting demand. There is ongoing work to validate and correct the waiting list, primarily to
provide assurance that the right children on list but also to identify any other support that can be put in place for those on the list
whilst they wait. A Test of Change is planned with wider partners (education, GP’s and SW) to improve on understanding of neuro
specific challenges for children and how they can be supported through Child’s Plan whilst they wait to be seen. A range of groups
have also been developed to support parents. These groups focus on sleep, behaviour and eating. 
The service has also completed a commissioning process to secure neurodevelopmental assessments from an independent
company. The first group of patients will begin their assessments in August 2023. A NDS Operational Group and NDS Steering
Group have been established. The first will manage the practicalities of delivering the service in collaboration with an outside
provider, as well as internal capacity and demand challenge. The second will provide assurance to the CAMHS Recovery and
Renewal Programme Board that the commissioned provider is delivering ask of initial tender as well as delivery of learning
achieved from Tests of Change. 
8.  Psychological Therapies Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Percentage of patients commencing
treatment within 18 weeks of referral 90% 85.1% 85.8%    
Narrative and Corrective Action

Page 408

11 
Trajectories, completed by the PHS embedded analyst using the recommended methodology from PHS, indicate that the RTT is
likely to be achieved by the end of the calendar year. Of note, these projections are based on a number of assumptions including
retention of current staffing and recruitment to vacant posts, levels of demand, continuation of funding. 
Psychological Services have focused on addressing the longest waits through various means. A Consultant Psychologist is now in
post to coordinate the management of longest waits in Adult Psychological Therapies Teams (PTT). Sharing out longest waits
across localities, where appropriate, allows patients to be seen more quickly and reduces variation across geographical boundaries.
Early screening appointments for patients referred to Adult PTT are now routinely offered to ensure that patients are directed to
services that will best meet their needs at the earliest point in time. A stepped care approach to delivering evidence based therapies
is now established utilising online therapy programmes, digital therapies and group-based interventions, and offering face-to-face
psychological therapies where this is deemed the most appropriate form of psychological therapy. 
A focus on staff wellbeing continues in order to support our workforce and promote staff retention. Consultants are now in place to
lead on Quality Improvement and Research which, in addition to service improvement and adding to the evidence base, will also
create and maintain an enthusiastic workforce. Centralisation of recruitment processes and the creation of generic job descriptions
has led to a noticeable improvement in reducing vacancies across the service. 
Performance for March shows 86.7% with 739 patients waiting over 18 weeks. Longest wait is 51 weeks.
9.  Adult Mental Health Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Consultant Outpatient WT - Adult Mental
Health - 12wks (NHSL) (NORTH HOSTED) 90% 63.8%    
Consultant Outpatient WT - Older Adult
Psychiatry - 12wks (NHSL) (NORTH
HOSTED) 
90% 80.2%   
Narrative & Corrective Action 
Both Adult MH and OA Psychiatry services have yet to recover performance to the target set, largely owing to increasing demand
and significant backlog effected by lockdown restrictions. A programme of recovery commenced in 2021 and has seen progress
where there a no patients waiting in excess of 52 weeks for PT. The Scottish Government Target for Psychological Therapies is for
90% of patients to commence therapy within 18 weeks of referral (RTT) by 31/3/23 – at March 2023 NHS Lanarkshire had achieved
86.72, which represents an improvement in spite of clinical vacancies (clinician vacancy rate 8% - 14.65WTE vacancies of
177.82WTE) and increased complexity of cases presented.

Page 409

12 
Some increase in overall staffing and use of hybrid delivery has allowed for some improvement, however analysis suggests that
continued improvement is contingent on maintaining or improving current staffing levels, therefore the service focus is currently on
retention of staff within NHS Lanarkshire Psychology services. A large MDT Research conference planned for January 2024 in
collaboration with University partners and provides current staff with continued professional development and engagement with the
wider professional network. It is anticipated that such events will assist in the recruitment and retention of staff, however it should
be noted that whilst efforts to recruit and retain staff should yield some improvement, performance in Psychiatry services is also
heavily impacted nationally by challenges around recruitment and retention of Consultants, which is recognised and managed as a
risk on the MH & LD Risk Register. 
10.  Waiting Times Performance - Medical
Children & Young People (Consultant
Led)
Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Medical Paediatrics WT - 12 wks (NHSL)
(NORTH HOSTED) 90% 46.4% 49.2%   
Narrative & Corrective Action 
Acute Paediatrics have started to realise some recovery in their medical waiting time target. Focussed work has been carried out
to address this challenge. This includes ongoing robust vetting and allocation of experienced colleague time to address longest
waits. It is anticipated that the level of acuity within acute paediatrics will reduce over summer months. This will secure planned
appointment capacity is met within months ahead to further progress current performance position.

Page 410

13 
A Paediatric Consultant post was successfully recruited in March. Unfortunately, they will not take up post until after summer.
Meantime, additional capacity is being provided by a locum consultant and extension of a temporary contract to a retired
consultant colleague. 
The Paediatric Programme Board is in process of being re-established. They are being supported with dedicated project
leadership time. An initial workshop has been undertaken and information gathered will inform focus of work going forward.
Particular attention will be required on sustainability of service delivery due to concurrent challenges in consultant level workforce
(age demographic of colleagues, reduced number of whole time equivalency training places and changes to shape of speciality
training which provides additional capacity within current rotas). 
Performance for April shows 49.3% with 898 children waiting over 12 weeks. Longest wait is 49 weeks.  
11.  Waiting Times Performance – AHP and
Community Services   
Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
SLT - Paediatrics - 12wks 
(NORTH HOSTED) 50% 27.1% 28.8%   
Narrative & Corrective Action 
Speech and Language Therapy continue to face significant challenges around meeting of waiting time target. A service
improvement plan is in process and the management team have been provided with support.  A service improvement workshop
was facilitated on April 25th by a project lead and service improvement colleague who have been provided with ongoing dedicated
time to support service improvement change capable of addressing this challenge. 
The workshop was led by the professional lead and colleagues invited included SLT Senior Management Team, Team Leads,
SLT Service Improvement colleagues, Practitioners and representation from aligned university. The workshop focussed on
mapping of current pathways into and through the service. This has provided the detail needed that will appropriately inform next
steps. A formal work plan will be able to be shared in months going forward. 
The SLT management team should be acknowledged for their transparency and positive approach to the process and leadership
of SLT colleagues. This facilitated positive contribution from all involved. It should be noted that significant work has already been
undertaken and the workshop used that as a benchmark of current position of strengths and weaknesses to identify what wider
organisational support could provide to progress position.

Page 411

14 
EHealth 
The current limitation of eHealth systems makes it difficult to robustly report performance and presents a challenge as info is
collated through local arrangements.Trakcare is not being used to full potential across the service. However, it is being used with
success in one area. Small changes will be required to ensure that fully fit for present and future purpose. This will then be tested
prior to being expanded into other teams. 
Morse- SLT are currently not on MORSE. They are on the MORSE work plan. This will be an important piece of work as it will
provide transparency of intervention and will align with wider children’s services aspiration of having a system that is capable of
sharing information of children across our scope of care and within NHS Lanarkshire. This will also support team leaders to have
provide organisational assurance of the quality of work being delivered across teams and by individuals 
Processes
Wide variance of process across the system (and individual teams). Standardised and consistent processes require to be
developed that reflect pathway and support a consistent measure of locally agreed 12 week treatment target. Waiting List
coordinator colleagues are working with team to offer support needed that will improve local systems. 
Work Force
A review of current workforce demographic is required to inform our future planning. Consideration required of :-
 Age – succession  planning for retirements in 2 year, 5 year, 10 year plan
 Challenging landscape of newly registered staff recruitment- links require to be built with Universities. A university
colleague attended on day and will continue to link in with future work force planning.
 Opportunities for expansion of Band 4 roles.
Environment
SLT are spread across multiple sites facilitate collaborative working with other health care colleagues and education. This will
require further mapping to ensure we continue to have capacity to deliver future care in right place at right time by right people. 
Performance for April remains at 28.8% with 1407 children waiting over 12 weeks. Longest wait is 75 weeks. 
12.  Stop Smoking Service  Target
2022/23
2022/23
Q1
2022/23
Q2
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status

Page 412

15 
Sustain and embed successful smoking
quits, at 12 weeks post quit, in 40% of
SIMD areas.
902 82 304   
Narrative & Corrective Action 
There is an intention to review all NHSL Board targets in this area. It should also be noted that there is a delay in receiving
validated smoking cessation data. 
Lanarkshire Stop Smoking Service Local Delivery Plan performance
In 2021/22, LDP performance in NHS Lanarkshire was 85.0% of target which was better than the Scottish average figure of 78.3%
and was the 5th highest figure across all NHS Boards. 
Extrapolating quarter one 2022/23 figures indicates that the % of the LDP target achieved will reduce across all NHS Boards. 
Quarter two figures will be available by the end of May at which point the forecast of performance against the LDP target will be
updated for all NHS Boards. 
Lanarkshire Stop Smoking Service overall performance
In terms of overall performance, the service is ranked 9th across Scotland. The areas of strength in comparison with other boards
include our performance with regard to LDP targets and the delivery of Stop Smoking services within community pharmacies. The
areas for improvement in comparison with other boards include our delivery of Stop Smoking Specialist services. 
There are outline plans to introduce additional Local Improvement Targets (LITs) and to implement the recommendations from the
deep dive review. A full report will be published end of June 2023 in response to National review.
The national review of stop smoking services is due to report in June 2023, which will inform further improvements, particularly
within specialist services. It is expected that this report will recommend revisions to LDP targets and a more focused approach on
priority areas such as Pregnant women, people living in deprived areas, people who smoke who also have mental health
problems and people who are hospitalised. 
Vaping 
NHS Lanarkshire is working with partners including ASH Scotland, Fast Forward, Landed and University of Edinburgh to develop
resources with regards to youth vaping. The prevalence of vaping is influencing the wider national discussion and media focus on
Tobacco control and has prompted a proposal from Scottish Government to establish a national expert group for E-cigarettes and
vaping.

Page 413

16 
13.  Sickness Absence  Target
2022/23
2022/23
Q3
2022/23
Q4
Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Sickness Absence (NHSL, North)   8.31% 7.41%   
Sickness Absence (NLC) - days lost per
person 11.32 8.56 11.96   
Narrative & Corrective Action 
All long and short-term sickness absence continues to be managed in accordance with the relevant policies for NHSL and NLC,
with monitoring of policy application managed within each service and organisation. The performance in this area reflects wider
performance within the partner organisations; in NHSL, Nursing and Midwifery continues to be the most challenged cohort of staff. 
Within NHSL, sickness absence is being targeted within the Sustainability & Value Programme as a key area of focus. Anecdotal
evidence supports a management view that some grip and control in this area was lost during the C19 pandemic due to significant
changes in practice and changes in operational management post-pandemic. Additional analysis and improvement planning has
been commissioned through the North HSCP. In NLC monthly meetings are taking place between Senior Managers, Service
Managers, and HR Business Partners where monthly absence performance is reviewed within the respective teams.