Page 1

1 
REPORT 
Item No: 8 
SUBJECT: Resilience Response
TO: IJB Performance, Performance, Finance and Audit Committee
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Author(s)
of Report
Ross McGuffie ,Chief Officer North HSCP
DATE: 19th April 2023 
1. PURPOSE OF REPORT 
1.1 This paper is coming to the IJB Performance, Finance and Audit Committee:   
For approval  For endorsement  To note 
1.2 This paper sets out the actions taken to date during the pandemic response. 
2. ROUTE TO THE IJB PERFORMANCE, FINANCE AND AUDIT COMMITTEE 
2.1 This paper has been: 
Prepared  Reviewed  Endorsed 
By the command structure in the Health and Social Care Partnership.   
3.          RECOMMENDATIONS 
3.1  The PFA is asked to:
(1) Note that NHS Lanarkshire stood down its Covid Live Incident down in
January 2023, though command structures have been adapted to continue to
focus on ongoing wider resilience challenges, specifically around service
pressures
(2) Note that NHS Lanarkshire was able to move from black to red status on 6th
March 2023, following a successful ‘firebreak’ as part of Operation Flow 
4.  VARIATIONS TO DIRECTIONS 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Background
5.1.1  NHS Lanarkshire stood down its Live Covid Incident in January 2023, however,
the operational pressures emanating from the pandemic recovery have been
pronounced, with NHS Lanarkshire in Black status since 27th July 2022. 
Yes  No  N/A

Page 2

2 
5.1.2 Operation Flow was developed to create a ‘firebreak’ to rapidly reduce hospital
inpatient capacity, then creating the staff capacity to work on service redesign to
bring the system as a whole back into equilibrium. 
5.1.3 Following the 9-day firebreak, hospital inpatient capacity reduced by around 15%
across Lanarkshire, supporting the system to move from black to red status on 6th
March 2023. 
5.2 Operation Flow
5.2.1 The IJB received an update on Operation Flow at its meeting on 22nd March 2023.
Operation Flow is the whole system strategic planning approach in Lanarkshire
aimed at supporting a sustained recovery of the entire health and social care
system. 
5.2.2 The planning exercise commenced with senior leaders from the three acute sites
and two HSCPs coming together face to face to discuss the key areas of challenge
and potential areas of gain for the system as a whole. This engagement approach
set a positive tone of collective responsibility and whole system working, and it is
positive that following the Firebreak, further whole system learning sessions have
been arranged for 6th and 27th April to collectively develop the next phases of
Operation Flow. 
5.2.3 In preparation for these sessions, the North HSCP has held a feedback session
based on the Firebreak activity and dedicated time at the Strategic Leadership
Team to further review the learning so far. A number of key themes have emerged,
including: 
 Significant gains in whole system partnership working from the Firebreak
 The ever increasing role of Home Assessment Teams in supporting
discharge and also controlling future demand into mainstream Home Support
services
 The need to better steward referrals for equipment
 Hospital at Home’s extended hours (to 8pm) led to the safe management of
a larger caseload of patients, with significant increases in referrals received
 Interim Care needs to continue as part of the Choices Protocol for Care Home
admission and also to support any Localities struggling with Care at Home
capacity
 The discharge process is complex, bureaucratic and time consuming and
needs to be streamlined across the system
 We use multiple (largely paper based) systems to record the discharge
journey, that means there is never one version of the truth and makes joined
up working more challenging
 Trakcare isn’t updated frequently enough, with the example of 238 delayed
discharge bed days being recorded on the system despite the patients
already being discharged
 Further work required to consistently implement the Flow Bundle, including
developments such as Planned Date of Discharge and Criteria Led
Discharge 
5.2.4 Staff directly involved in the operational delivery of the Firebreak will be in
attendance at the learning sessions in April to ensure that we are able to get into
the detail of the kind of issues noted above.

Page 3

3 
5.3 Delayed Discharge
5.3.1 One of the key aims of the Firebreak was to utilise multi-agency teams to review
all inpatients on a daily basis, with the aim of improving the flow of the 95% of
patients who don’t need supported discharge, but also supporting earlier
identification of the 5% who will require support. 
5.3.2 Consequently, one of the anticipated outcomes of the firebreak was the
identification of a significant number of referrals for Social Work/Social Care
support. Over the nine-day firebreak, 180 referrals for supported discharge were
received in North Lanarkshire, with a further 81 in the three days running up to the
start. To put this into context, during peak winter pressures in 2019/20, North
Lanarkshire averaged 77 referrals per week for supported discharge, which was
the highest rate in Scotland. 
5.6.3 However, despite the spike in demand, the recently improved performance in
delayed discharge has been maintained. At the start of the firebreak, there were
84 delays in the system, with 40 of these on the acute sites, and at 31st March, this
has reduced to 69 delays, with 26 on the acute sites. On 20th March, the HSCP
had its lowest recorded number of delays since November 2021 at 59. 
5.6.4 While delay numbers will continue to fluctuate day by day, overall performance
since the Firebreak has been much improved with considerable efforts ongoing to
ensure the changes made through the Firebreak activity can become sustainable
across the system as a whole. 
6. CONCLUSIONS
6.1 There has been a tremendous whole system effort to plan Operation Flow and to
enact the firebreak at scale and pace. 
6.2 The reduction in occupancy levels across all three sites has allowed NHS
Lanarkshire to move from black to red status on 6th March 2022, following over 6
months in black status. 
6.3 Attention has now moved to make the most of the system decompression to move
forwards with the ambitious change programme identified to ensure the positive
performance improvements can be sustained and indeed further improved over
time. 
7. IMPLICATIONS 
7.1  NATIONAL OUTCOMES 
This relates to all nine national outcomes. 
7.2 ASSOCIATED MEASURE(S) 
A weekly performance framework has been developed to track progress. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT

Page 4

4 
Risk IJB 17/22 sets out the unscheduled care challenges currently being faced in
the Lanarkshire system. 
7.5 PEOPLE 
The Strategic Planning Group has increased in frequency to quarterly throughout
the pandemic to support engagement with staff, service users and carers and staff
roadshows have also recommenced on a quarterly basis. 
7.6  INEQUALITY & FAIRER SCOTLAND DUTY 
Yes  No  N/A 
8. BACKGROUND PAPERS 
None. 
9. APPENDICES 
.............................................................................
CHIEF OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact