Democracy Spraffa

Item 9 - Covid-19 Update-Resilience Response

North Lanarkshire Council · 14 February 2023
Back to IJB Performance, Finance and Audit Committee — 14 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
REPORT 
Item No: 9 
SUBJECT: Covid-19 Update / Resilience Response
TO: IJB Performance, Finance and Audit Subcommittee
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Author(s)
of Report
Ross McGuffie ,Chief Officer North HSCP
DATE: 14th February 2023 
1. PURPOSE OF REPORT 
1.1 This paper is coming to the Integration Joint Board:   
For approval  For endorsement  To note 
1.2 This paper sets out the actions taken to date during the pandemic response. 
2. ROUTE TO THE INTEGRATION JOINT BOARD 
2.1 This paper has been: 
Prepared  Reviewed  Endorsed 
By the command structure in the Health and Social Care Partnership.   
3.          RECOMMENDATIONS 
3.1  The IJB is asked to:
(1) Note that NHS Lanarkshire stood down its Covid Live Incident down in
January 2023, though command structures have been adapted to continue to
focus on ongoing wider resilience challenges, specifically around service
pressures
(2) Note the whole-system response to ongoing health and social care
pressures, as outlined in appendix 1. 
4.  VARIATIONS TO DIRECTIONS 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Background
5.1.1 COVID-19 was declared a pandemic by the World Health Organisation on 12
March 2020, with spread of COVID-19 within all communities in the UK in the
intervening period. 
Yes  No  N/A

Page 2

2 
5.1.2 Command structures were immediately put in place in both North Lanarkshire
Council and NHS Lanarkshire, with the Health and Social Care Partnership fully
participating in both. In addition, the pan Lanarkshire Resilience Partnership has
supported cross-agency developments. 
5.1.3 NHS Lanarkshire stood down its Live Covid Incident in January 2023, so this will
be the final Covid update report unless a new live incident is established. Further
updates will continue around wider system resilience. 
5.2 Update on Numbers
5.2.1 As at 26th January, the seven-day case rate within North Lanarkshire is 23.4 per
100k population, which is a further decrease to the figures last presented to the
IJB from 18th November when it was 35.2 per 100k. 
5.2.2 The inpatient peak of the second wave of Omicron was 322 covid positive
inpatients on 28th March 2022, with a further 63 in off-site facilities. As at 31st
January, there are 66 covid positive inpatients and a further 1 in offsite facilities,
which in total is a slight increase from the 59 reported on 18th November. 
5.2.3 On 27th July 2022, NHS Lanarkshire moved from red to black status due to
escalating staff and bed shortages across the system. 
5.3 Care Homes
5.3.1 As at 31st January, there are 5 outbreaks in care homes covering 29 residents and
18 members of staff cumulatively. 
5.4 Delayed Discharge/System Pressures/Home Support
5.4.1 For the majority of 2022, North Lanarkshire maintained delays around the 70s and
below, reaching a low under 50 delays during June. However, over December and
January, delays have hovered around the 100 mark, which while significantly
beyond where we wish to be, is still around the Scottish average in rate terms.   
5.4.2 During peak winter pressures in 2019/20, North Lanarkshire had the highest rate
of referrals for supported discharge in Scotland, averaging 77 per week. Two
weeks in January 2023 have totalled 145 and 158 referrals, with the average
weekly referral rate over 22/23 being in excess of 120 per week. 
5.4.3 As at 30th January, the delayed discharge position is 93 delays with 41 discharges
taking place. Recent data requested by Scottish Government has identified that
the turnover of delays is approaching 50% per week, with many of the longer
delays associated with AWI and Mental Health cases. 
5.4.4 The winter business case was approved at a special meeting of the IJB on 16th
February 2022, with recruitment underway to support the development of the new
models proposed, including: 
 Home Assessment Teams in each Locality to support early discharge as well as
admission prevention 
 Expanded Home Support and Reablement capacity in each Locality
 New resource in District Nursing teams to proactively support Care Managed
patients (those identified as being at the highest risk of admission)
 Expanded Integrated Rehabilitation Teams to create additional rehabilitation
capacity for both discharge support and admission prevention

Page 3

3 
5.4.5 Home Assessment Team roll out continues, with capacity continuing to increase in
Cumbernauld and Wishaw teams. Over 600 patients have now been supported
home much earlier than would normally be possible, with 60% requiring no
ongoing Home Support package after 2 weeks of wrap around support.   
5.5 Covid Vaccination
5.5.1 The Covid vaccination programme has been very successful in Lanarkshire, with
the current position noted below, following the autumn/winter programme roll out:   
Total doses administered 1,835,182
Individuals with at least 1
dose
560,175
Partially vaccinated 26,294
Fully vaccinated  92,277
Boosters 441,604 
5.6 Ongoing Resilience Response
5.6.1 There remains significant ongoing pressure in all health and social care systems
across Scotland. High demand and patient acuity, coupled with increased flu and
covid numbers in recent months has placed even greater demand on the system. 
5.6.2 In Lanarkshire, there is a genuine whole-system focus to our resilience response.
Following a number of requests and directives from Scottish Government, a whole
system letter was issued to Caroline Lamb, Director-General Health & Social Care
and Chief Executive NHS Scotland and Sally Loudon, Chief Executive, COSLA to
outline the positive work underway. This letter has formed the basis of a whole-
system briefing prepared by the three Chief Executives and two Chief Officers
(see appendix one). 
5.6.3 Further resilience updates will continue to be issued to the IJB and the IJB
subcommittee until balance is restored in the system. 
6. CONCLUSIONS
6.1 There has been a tremendous effort across the whole system (including third and
independent sectors, communities and public partners) in response to the
pandemic and more recent system pressures. 
6.2 The dedication, bravery and commitment of all of our frontline staff should be
commended in supporting us to continue to deliver a strong service to our
residents in North Lanarkshire. 
6.3 A whole-system approach has been taken to respond to the current system
pressures, with key actions in response to recent Scottish Government outlined in
appendix 1. 
7. IMPLICATIONS 
7.1  NATIONAL OUTCOMES 
This relates to all nine national outcomes. 
7.2 ASSOCIATED MEASURE(S) 
A weekly performance framework has been developed to track progress.

Page 4

4 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT
Risk IJB 09/21 sets out the impact of Covid on the roll out of the IJB’s Strategic
Plan and is currently rated at very high. 
7.5 PEOPLE 
The Strategic Planning Group has increased in frequency to quarterly throughout
the pandemic to support engagement with staff, service users and carers and staff
roadshows have also recommenced on a quarterly basis. 
7.6  INEQUALITY & FAIRER SCOTLAND DUTY 
Yes  No  N/A 
8. BACKGROUND PAPERS 
None. 
9. APPENDICES 
Appendix 1: Whole system response to system pressures 
.............................................................................
CHIEF OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact
Ross McGuffie on telephone number 01698 752 591.

Page 5

5 
Appendix 1: Summary Briefing: Lanarkshire Whole System Response to System
Pressures
Date: 31.01.23
Prepared by: 
Jann Gardner - Chief Executive, NHSL
Cleland Sneddon – Chief Executive, South Lanarkshire Council   
Des Murray - Chief Executive, North Lanarkshire Council 
Soumen Sengupta – Chief Officer, South Lanarkshire Integration Joint Board
Ross McGuffie – Chief Officer, North Lanarkshire Integration Joint Board
1. Purpose of briefing 
1.1. To provide an update on the whole Lanarkshire response to the ongoing health
and social care challenges prevalent across Scotland, particularly in respect of
those actions being taken in support of pressures within University Hospitals
Hairmyres, Monklands and Wishaw.
2. Background
2.1. Whole system working is a defining feature of the Lanarkshire approach to the
sustained and unprecedented pressures facing our health and social care system.
This is manifested by both collaborative working at operational levels, and by
ongoing collaborative direction and oversight at Chief Executive and Chief Officer
level. The three Chief Executives work together on, are routinely sighted on and
are fully engaged in addressing the significant challenges faced by our services
and staff in Lanarkshire – within our hospitals, across our community health care
and social care services and amongst our partners in primary care. Both Chief
Officers are Executive Directors of both NHS Lanarkshire and the respective
Councils – so as well as being integral members of Corporate Management
Teams also provide an essential leadership bridge for the strategic collaboration
that we are committed to Lanarkshire-wide. 
2.2 Our staff – with the support of our partners – continue to work diligently and
tirelessly. This includes the significant contribution of our leadership teams. We
are hugely appreciative of everything that they all have delivered and their
continuing commitment to our communities and to the difficult work ahead. 
2.3. The Lanarkshire Winter Plan 2022/23 was presented to the NHS Lanarkshire
Board in October 2022 and subsequently both Integration Joint Boards (IJBs) and
appropriate forums of both Councils. Additionally, briefing sessions on the
challenges that our communities, our staff and our system were facing and then
the mitigating actions that were being taken as part of that Winter Plan were
provided for members of the NHS Lanarkshire Board, both IJBs, local elected
members, MPs and MSPs. 
2.4 This briefing provides a high-level summary of the range of work that our teams
have been progressing and developing through the festive period to now. It
incorporates continuing work in relation to the above extant Winter Plan and our
wider approach to unscheduled care. The contents have formed the basis of a
joint letter sent to Caroline Lamb, Director-General Health & Social Care and Chief
Executive NHS Scotland and Sally Loudon, Chief Executive, COSLA.

Page 6

6 
3. Plan of Action
3.1. In Lanarkshire, no hospital delay is acceptable and in general, it is recognised that
hospital discharges need to increase to safely and appropriately enhance the
“flow” of patients through hospitals.  To support this philosophy, Discharge Without
Delay (DWD) has been endorsed through all management and governance
routes, acknowledging that fully embedding such a significant change programme
is an ongoing process.  Our commitment to DWD includes our reinforcing the
importance of the Home First principles and Planned Date of Discharge (PDD)
across our services. It also acknowledged that circa 95% of all patients are
‘discharged without delay’ - and accordingly, ensuring effective processes internal
to the hospital setting is crucial to the management of patients whose discharge is
delayed for any reason so as to appropriately and safely minimise the length of
stay for all patients, the vast majority of whom who do not require packages of
care or care placements and whose discharges are not classed as a “delay”. 
Role of Professional Leads in Response to Service Pressures
3.2 Lanarkshire has a well-established Care Home Assurance Tactical Group, whose
membership includes professional leads from across health care disciplines and
from social work in both HSCPs. In turn, there is a dedicated Nurse-led Care
Home Liaison Team that works closely with all care homes such that they can
respond as flexibly as possible - recognising statutory responsibilities – and
continue to provide support to the wider system pressures across Lanarkshire. 
3.3 A similar multi-professional oversight group is well-established in respect of
Lanarkshire care at home services under the co-chairing of both Chief Officers. As
well as ensuring consistent practice, this mechanism has seen the approval of a
move to retain care packages for 72 hours for anyone with a care package who is
admitted to the hospital - which contributes to both our DWD programme and
‘Operation Flow’ (described in sub-sections 13 and 14 below) to maximise
discharge capability. 
3.4 Both Chief Social Work Officers for South and North Lanarkshire also provide
close professional oversight of “in-house” HSCP care at home and residential care
services so that again, those teams can be as responsive as possible whilst
recognising the statutory responsibilities associated with being registered services
employing registered staff. 
Interim Care Home Beds 
3.5 Both HSCPs have commissioned interim care home beds in seeking to reduce the
number of patients who remain in hospital pending the availability of their care
home of choice or the necessary care at home package to support their safe
discharge home.  Across both HSCPs, there are approximately 80
interim/intermediate care beds being commissioned to provide additional capacity.
Both HSCPs have instigated systems to promote “flow” through these placements
such that the capacity can be maximised whilst ensuring patients are not “stuck” in
an inappropriate setting. 
3.6 We recognise that many providers have had and continue to have reservations
about providing interim placements. We have also identified that that there is
frequently a reporting disparity between the headline empty beds vacancy position
and the actual available for use position across the care home sector, and that is a
limiting factor for providers.

Page 7

7 
3.7 Both South and North Lanarkshire Councils have already introduced a short term
enhanced rate at 25% supplement on National Care Home Contract rates for
nursing rates in support of such placements. This enhanced rate is to cover
additional costs attributable to hospital discharge placements and to ensure that
care homes can respond quickly to each referral. We were happy to share our
work in this regard and for the methodology adopted by both Councils to have
helped shape the recently announced national approach to commissioning interim
care. 
3.8 More fundamentally we understand that moving into a care home is a very
personal decision for a person and their family, and so appreciate the importance
of supporting our staff in what can be very sensitive conversations. Recognising
that there is no legal framework for social workers to compel individuals to take up
an interim placement, our Care Home Assurance Tactical Group guidance was
developed to support staff to apply the National Choice Guidance to Patients
within wards who have had their full assessment completed; have been allocated
finance; and have appropriate legal framework confirmed to support moves (noting
that it should not be used to support moves of any individual who is progressing
through the Adults With Incapacity pathway – see 3.9). We were very happy to
share this with Scottish Government colleagues to inform the national guidance
subsequently circulated. 
Support for Carers 
3.9 Extensive support for carers has been made available throughout the year as part
of the respective Strategic Commissioning Plans of both IJBs and this has been
enhanced in the winter period. Primarily, direct support is provided via the
Lanarkshire Carer’s Centre and respective outreach services, and this is being
enhanced by dedicated carers staff who support the hospital discharge processes,
working with carers to seek to ensure all possible supports are in place to ensure
effective and safe discharges. This includes each individual having a named
worker, dates agreed for planned discharge and identified rehabilitation input to
ensure an enablement focus. In January 2023, the North Lanarkshire HSCP
started the offer of up to £1000 to support families and carers to support
discharge, covering costs such as additional heating/food or new items required
such as a bed to support downstairs living during recovery. 
Adults with Incapacity 
3.10 The Chief Social Work Officers for South and North Lanarkshire are both
committed and engaged in the whole system efforts to the significant system
pressures that are being contended with. Their advice and guidance is crucial to
ensure actions taken by social workers are in accordance with their powers and
duties as prescribed within the legislative framework, enabling them to preserve
the human rights of the individuals requiring intervention through them. This is
especially important in respect to individuals made vulnerable through mental
incapacity, and we are all clear about the importance of supporting the social
workers involved in discharging this delicate role. 
3.11 There are a variety of reasons for delay in relation to progressing guardianship
application, e.g. identification of local solicitors to carry forward private
applications. We understand that this might be alleviated via Scottish Government
engagement with the Law Society of Scotland to consider the means by which
particular concerns regarding applications can be highlighted, to encourage
promotion of services at a local level. Discussion may also usefully be undertaken

Page 8

8 
with the Scottish Legal Aid Board, to consider the possibility of them expediting the
process of determining applications for legal aid to support families pursuing
applications in the Sheriff Court. It may also be of assistance for nationally there to
be discussion with the Scottish Courts Tribunal Service in an effort to identify
opportunities for the prioritisation, and expeditious processing of guardianship
applications to limit any delays in securing their determination and guardian
appointments. 
3.12 Both HSCPs utilise best practice methodology in seeking to ensure the discharge
process associated with the management of AWI patients is undertaken as
timeously as possible whilst still complying with legislative requirements. There is
dedicated Mental Health Officer (MHO) support for these patients.  Utilisation of
13za is actively pursued when appropriate and there is weekly scrutiny of the
patients’ pathways.  It should also be noted that both HSCPs have undertaken
publicity campaigns seeking to maximise the number of people with Power of
Attorney in place such that it reduces the potential number of AWI patients in the
system. 
Confirming Arrangements for COVID-19 testing before care home discharge and
follow-up communication with services and families on seasonal respiratory
infections 
3.13 As described above, there is a very effective Care Home Assurance Tactical
Group and associated systems in place in Lanarkshire.  Through the offices of this
group, up to date guidance is issued upon receipt together with offer of support to
any care home where they may wish some additional assistance to understand
implications of same. This includes all information in relation to testing both at time
of admission and discharge. It also ensures appropriate infection control advice is
available for both staff and residents such that any disruption to normal working is
minimised and safety maintained.   
Delivering a different model of care for a short period e.g. moving to critical/life
saving care only 
3.14 Throughout the winter, a ‘command’ meeting structure has been in operation. 
This has involved a three times weekly meeting supported by three (or more)
times daily position statement calls.  The Command Meetings are attended by
NHSL Corporate Management Teams - which include both HSCP Chief Officers -
and senior clinical Acute and HSCP representatives. The daily position calls are
similarly attended by senior operational representatives of all parts of the system,
including local social work teams and the Scottish Ambulance Service (SAS). 
3.15 During the course of December and through January, the Command Meeting has
agreed prioritisation of work such that, for instance, planned elective work has on
occasion been stood down and priority given to unscheduled care.  Similarly, there
has been prioritisation of additional trauma sessions to clear backlogs/manage
increased trauma during recent inclement weather.   
3.16 As part of this prioritisation, it was also agreed that community nursing in both
HSCPs would be moved onto a ‘red’ pathway, thereby meaning that only essential
care was undertaken and releasing some staff to undertake other work to
maximise hospital discharges/avoid admission.

Page 9

9 
3.17 The Command Meeting has also recognised the significant pressure on primary
care and is minded that in cancelling elective care and/or standing down
outpatient clinics then so this increases the pressure on primary care as the
patients then re-present to their GP seeking additional assistance pending access
to secondary care. As such, it is only those clinics where there is real scope for the
capacity released to significantly improve unscheduled care flow that have been
stood down. 
3.18 Work is ongoing with Scottish Government colleagues in understanding the impact
of standing down some unscheduled care and the respective recovery trajectory to
get services back to the original forecast for waiting times. 
Opening/procuring additional capacity 
3.19 The ability to open additional capacity has been limited as a result of a lack of
available staffing. Even where staff have been released, this primarily has been
utilised to support existing staff shortfalls in mainstream areas where they are
having to manage additional beds in existing wards, e.g. through the use of a ‘fifth’
bed in four-bedded bay, using day rooms, and caring for patients in beds in ‘non-
bedded areas’ in A&E whilst awaiting transfer to a ward. 
3.20 All efforts have been made to secure additional capacity via external providers and
the Golden Jubilee National Hospital, however this has had limited impact in
practice. 
3.21 In addition, both HSCPs had already invested in recruiting additional health care
support staff into Integrated Care and Support Teams (South Lanarkshire HSCP)
and District Nurse Teams (North Lanarkshire HSCP) to support rapid response for
patients who wish to be discharged from hospital to die at home. This ‘End of Life’
Care pathway work meant that patients who would otherwise be awaiting high
resource care at home packages could be discharged early and means that yet
another cohort of patients who may otherwise be delayed in hospital were now
being managed in their own homes. These teams work closely with specialist
palliative care medical and nursing staff as well as hospices if required. Typically,
these teams are routinely managing around forty people who would otherwise be
in hospital. 
Moving Staff to Areas of Pressure 
3.22 As described in sub-section 7 above, appropriate staff from a number of areas
were re-directed such that they could support ‘flow’ through the system in recent
weeks. 
3.23 Sixty-four staff from the NHSL Vaccination Service were moved to support wider
hospital pressures at end of December whilst a further twenty have been moved in
the last week. This follows on from the completion of the vaccination programme
which also played a key role in minimising the numbers of people who may
otherwise have had to be admitted to hospital either as a result of Covid-19 or flu. 
3.24 In Lanarkshire, we also recognised the likely pressure on the system in winter
when starting our winter planning process in July 2022.  In light of this, we offered
an extended LES for our GPs whereby we were asking them if they would be
prepared to open on the fourth day of the four-day Public Holiday weekends, i.e.
27th December and 3rd January.  Thereafter, we also asked if they would be
prepared to open on each of the remaining Saturdays in January. Accordingly,

Page 10

10 
around 50% of the population of Lanarkshire have been able to access their own
GP as opposed to relying on A&E, Primary Care Out of Hours or NHS24. 
3.25 A key part of our Winter Plan was to have additional physiotherapy and
occupational therapy presence at the ‘front door’ to assist in recognising people
who could be supported to rehabilitate in their own home without the need for
admission.  Similarly, additional allied health professional (AHP) staff were
available at weekends to support ongoing assessment for weekend admissions
such that the scope to maximise discharges on the Monday was achieved. 
3.26 There has also been ongoing review of AHP services to recognise where any
additional input could be provided to both support discharges and through
additional community input, avoid admission. It is important to acknowledge that,
reasonable mitigations notwithstanding, such necessary re-prioritisation of staff
have inevitable implications for other areas of service delivery and performance
recovery. 
Increased Engagement with Third Sector providers 
3.27 Both HSCPs have commissioned a range of services from the third sector which
support the ability of people to remain independent in their own homes as well as
specifically providing ‘non-statutory’ support to those people recently discharged
from hospital such that there is early warning of any issues which may otherwise
result in re-admission. 
Additional Funding for Care Home Beds 
3.28 Independent providers of social care in Scotland have highlighted the extremely
difficult operating environment. Coupled to the cost-of-living-crisis and the impact
of the pandemic, vacancy pressures are a significant concern for many providers
in terms of service viability. 
3.29 We have also identified that there is frequently a reporting disparity between the
headline empty care home beds vacancy position for providers and the actual
available for use position. A local review of care home information submissions
identified a variety of explanations for this, including: 
• Care homes operating waiting lists 
• Care homes reserving vacancies for planned pending admissions
• New admissions available but specific eligibility criteria i.e. a religious order
• Fee paying private admissions
• Room being used for respite
• Specific bed availability e.g. frail elderly
• Redecoration of rooms
• Beds closed due to outbreaks
• Moratoriums 
3.30 As highlighted at sub-section 3 above, both Councils have already instituted a
mechanism to spot purchase interim/intermediate care beds at a short term
enhanced rate at 25% supplement on National Care Home Contract rates for
nursing rates. Currently, there is scope to be purchasing circa eighty such beds at
any time across both HSCPs, thereby moving eighty people who would otherwise
be in hospital categorised as a ‘delayed discharge’. All patients requiring
supported discharge with a planned date in place and those who are delayed are
reviewed on a daily basis, with an individualised approach taken to explore all

Page 11

11 
options to move the patients to their end destination as quickly as possible, or
using an intermediate step where required. 
Discharge Intervention Required - Phase One 
3.31 As will be appreciated from the above, there has been a huge amount of work
undertaken to support the acute care sector over recent months and the
associated work to try and create additional flow through the whole system. 
3.32 Up to now, there has been a concerted approach to seeking to embed DWD and
maximise the concept of PDD. Linked to this is work to enhance morning and
weekend discharges. This is in addition to hospital transition teams (home
first/home assessment teams), and investment in discharge teams A&E
departments. There is a robust organisational structure where DWD improvement
projects are monitored and scrutinised through a dedicated DWD Lead and DWD
steering group. This group then reports to the unscheduled care board for NHS
Lanarkshire. 
3.33 Notable successes have been the introduction of the Home First philosophy,
introduction of PDD, development and implementation of a discharge policy. In
addition, there is the development of home first/ home assessment teams which
are expanding across Lanarkshire and are intended to be fully embedded by
March 2023. 
a. Home First 
Home First has been adopted across Lanarkshire and the message has been
reinforced recently across all staff groups. Patients and families are encouraged to
return and be assessed at home from hospital on the package of care they were
currently on or be assessed in a care home of their choice as an alternative to a
hospital bed. 
The Lanarkshire DWD action plan is closely aligned to the Realistic Medicine/
Health Improvement work across Lanarkshire hospitals. This work is delivered by
staff on each acute site who provide a holistic approach to care and encourage the
Home First principles. 
b) Planned Date of Discharge (PDD)
PDD has been getting phased in across Lanarkshire since 2020. The approach
has allowed targeted care to be delivered, reduction in referrals for care, and a
multiagency approach which includes robust assessment and care management. 
Lanarkshire has a DWD management information dashboard which can be drilled
down to hospital, HSCP, locality and ward levels. This allows for improvements to
owned at the most appropriate operational level. The current percentage of PDDs
recorded on the dashboard is 54% for Lanarkshire, with work ongoing to ensure
this is fully embedded and being reported accurately across the system.  Referrals
of those without a planned date of discharge account for a high percentage of
those patients whose discharge is delayed. Conversely, 90% of the patients who
have a planned date leave hospital on their PDD. 
DWD performance is reported monthly through the NHS Corporate Management
Team, and North and South Lanarkshire HSCP Senior Management Teams. A
whole system gap analysis is underway in relation to DWD and PDD to
understand where to focus improvements. This analysis is being developed into a

Page 12

12 
heat map for Lanarkshire. Once this is complete training and tools will be put in
place to ensure continuous and sustained improvements. 
c) Criteria Led Discharge (CLD)
Criteria led discharge is a priority development within all of the Lanarkshire
hospitals under the leadership of their respective site triumvirates with a clear
alignment to PDD. 
The risk appetite for CLD across medical and nursing teams has been a
component of the gap analysis and will feature in the above heat map. We have
identified and sites teams within each hospital are working towards improvement
in overall, pre-noon and weekend discharges. CLD has been implemented
successfully in surgical areas, supporting improvements in length of stay and work
is planned to expand the methodology across other areas of the system.   
d) Home First/ Home Assessment Teams
Our Home First (South Lanarkshire) and Home Assessment (North Lanarkshire)
Teams are hospital transition teams developed by South and North Lanarkshire
HSCPs respectively. They are supporting ‘discharge to assess’ through an
integrated approach across social work/care, allied health professional and home
care staff. These teams implement PDD once the patient is admitted into the
service allowing for the mainstream home care service to plan care after a period
of rehabilitation and assessment. These team have prevented patients from
becoming delayed, allowed for targeted care and have subsequently better patient
outcomes. We have also had some early success by deploying these teams at the
front door to prevent admission. Early indications suggest that around 60% of
individuals supported home in this way require no ongoing home care package
after two weeks of wrap around support. 
We are actively expanding this provision within what continues to be an extremely
challenging workforce supply environment, particularly in respect of home care. 
e) Discharge Support in Emergency Depts.
We have established discharge facilitators who support A&E departments across
our Lanarkshire hospitals. These arrangements have been strengthened through
collaboration with the Lanarkshire Flow Navigation Centre who will be screening
patients with social care needs overnight to allow for a rapid response by social
work/ care in the morning, thus allowing for more rapid restarts of care and
patients to be discharged to be assessed in a care home, should long term care
be indicated. 
In “day” hours, a combination of senior care manager, acute care of the elderly
nursing, a discharge facilitator and occupational therapy staff will provide
admission avoidance and rapid discharge capability. This is currently being piloted
in University Hospital Hairmyres. Outcomes will be reviewed with a view of rapidly
scaling up across all of our Lanarkshire hospitals. 
f) Hospital at Home (H@H)
There is an established H@H service which covers eight of the ten localities
across Lanarkshire.  The service is currently expanding into the Clydesdale
locality and this should be in place by March 2023.  Work is currently underway to
review the whole H@H service to establish how support could also be extended to
the Cambuslang/Rutherglen locality.

Page 13

13 
Discharge Intervention Required – Phase Two 
3.34 Notwithstanding the various areas of work set out at sub-section 12 above - all of
which is recognised as requiring to continue and become embedded as ‘good
practice’ in supporting hospital flow – we have recognised that there is a need for
an additional concerted approach to ‘de-compress’ our three acute hospitals in
particular. There is also recognition that there is an imperative to consider how
best to enable a similar whole system effort to “de-compress” our community
health and social care services, and to work with our colleagues in general
practice to do similar within primary care. 
3.35 Operation FLOW was launched on 20th January 2022. This is a rapid
improvement plan that will provide a focus for the work of our teams from now into
spring, its key components being: 
• Service improvement and recovery plans that are current being enacted as part of
the Winter Plan as well as the escalated measures agreed before Christmas.
• A concentrated and coordinated whole-system effort – a “firebreak” - will take
place from Thursday 23 February to Friday 3 March 2023, including a weekend
period, to stabilise and decompress our hospital sites. 
• Following this “firebreak”, we will enact further measures to sustain an improved
position across the whole system as we move through late winter and early spring. 
3.36 In order to be successful, we are taking steps to identify for additional capacity
during the firebreak period as well as working differently and flexibly over the
coming weeks. It is likely that additional shifts/hours will be offered to staff in
health and social care over the nine-day firebreak period to allow the necessary
focus on patient assessment, treatment and discharge. Communication will be
critical to the success of the “firebreak” and we are committed to ensuring we
providing our staff with the information they need to carry out local briefings and
discussions with staff. 
3.37 This “firebreak” should release the time and energy amongst our hospital teams in
particular so that they and we better progress the other elements of our overall
Operation FLOW improvement plan. Active planning continues with acute site and
locality teams. Each week, as we proceed with Operation FLOW, we will publish
an action plan update on the NHS Lanarkshire website, including a Q&A section to
provide more detail as it is confirmed. 
3.38 Operation FLOW marks a different approach to addressing the pressures we are
facing, but it is crucial to recognise the vast amount effort that has been and
continues to be made by our staff. 
Additional Developments to improve flow/ release capacity 
Acute Front Door Model 
3.39 We know that the infrastructure of A&E and Front Door Assessment Areas are
limited and overcrowding persists across all acute sites. This has a substantial
impact on achieving safe patient flow and ensuring staff well-being across the
Acute Sites. University Hospital Wishaw is significantly vulnerable in relation to
these challenges and as a consequence a priority project is underway to increase
front door assessment capacity on that site.  The A&E department requires to
remain fully operational whilst the works progress, so an internal decant option

Page 14

14 
has been identified and preparation work is underway to support a phased
approach to this development. If the internal decant option can be supported, then
A&E accommodation will increase by 15 bays in total once work is completed. 
3.40 We know that the front door accommodation within University Hospitals Hairmyres
and Monklands are also challenged, and we also acknowledge that the work
outlined above to enhance the footprint of University Hospital Wishaw is a short-
term solution. Therefore, we have commissioned Healthcare Planners to: 
• Undertake a whole system review of emergency and urgent care across acute,
primary and community services.
• Develop a strategy for the delivery of emergency and urgent care for Lanarkshire
to inform the development of the new NHS Lanarkshire healthcare strategy, Our
Health Together.
• Inform NHS Lanarkshire’s infrastructure requirements for urgent and emergency
care now and into the future which will influence the details of the Health Board’s
Property Strategy. 
3.41 We also recognise that current systems and processes within Lanarkshire A&Es
may have an impact on performance and so have undertaken a gap-analysis
diagnostic across all three sites. A key finding of this analysis has been the need
to standardise streaming processes across the three acute sites and determine
how best to ring-fence minor flow. 
This work is being progressed through Operation FLOW.   
Urgent Community Care 24/7
3.42 Urgent care in the community is that which requires a response before the next
routine care service (or appointment). The over-riding principle is “right care, in the
right place, at the right time”. 
3.43 We know that there is increasing demand on general practice - where it is
estimated 90% of urgent care is delivered – alongside workforce and sustainability
challenges across general practice. The NHS Board and both IJBs have endorsed
the need to look to radically change urgent care delivery to ensure sustainable
services in Lanarkshire. There is significant support for a model which brings
together a number of existing services together. 
3.44 The current system challenges also highlight the need to consider a way to deliver
urgent care during the in-hours period. Consequently, we are progressing a whole
system approach to agree how we will develop a co-ordinated, sustainable in-
hours community care service. We are aiming to have an outline model for this by
early Spring 2023. 
Expansion of Flow Navigation Centre (FNC) 
3.45 We also know the importance of signposting and direction of patients in terms of
“right care, in the right place, at the right time”. It is a better process if this is done
prior to patients presenting to A&E or Assessment Areas - the Lanarkshire FNC
has an important role in this.  Work has commenced with the Scottish Ambulance
Service (SAS) to implement a non-conveyancing pathway for patients with chronic
obstructive pulmonary disease (COPD). We are keen to expand this approach to
include other conditions such as patients with frailty or those who have a non-
injury fall.

Page 15

15 
3.46 Given that a Senior Clinical Decision Maker (SCDM) is not always available in the
FNC. we have implemented a model where the FNC teams can seek support from
a SCDM in A&E via Consultant Connect (see below). 
3.47 There is social work support within the FNC which is working really well in
preventing presentations or admissions to the “front doors” of each of the
hospitals. We are scoping the other roles that could potentially add further value to
the FNC, e.g. pharmacists and other allied health professionals. We are also
learning from colleagues across the wider NHS system around the form-and-
functionality of their FNCs to determine opportunities for Lanarkshire. This work
will also continue via Operation FLOW.   
Consultant Connect 
3.48 Consultant Connect is a method of professional-to-professional telehealth
communication which provides an opportunity for clinicians to receive specialty
guidance or advice pre-referral to specialist secondary care.  We anticipate that
this could reduce the number of patients presenting or being referred to A&E and
Assessment Areas, with project management support allocated to co-ordinate
wide-scale implementation across our system. 
Reprioritising routine care 
3.49 We recognise that the throughout the pandemic, there has been reduced capacity
to provide routine care in both primary and secondary care to routine care. This
has resulted in extended outpatient and diagnostic waits and impaired
management of chronic illnesses. This is contributing to dysfunction within the
acute care system as patient seek alternative pathways for help with their clinical
conditions, and have less well controlled comorbidities which may contribute to
increased length of stay. 
3.50 We are exploring a Population Health Management approach to prioritising
available resource, using both primary and secondary care data and following a
Triple Helix model, working closely with academic and eHealth industry partners. 
Interface Care 
3.51 The Interface Care Programme Team from the Scottish Government utilised the
data from Public Health Scotland to generate relevant analysis for Ambulatory
care sensitive conditions (ACSCs) codes. This analysis provided an understanding
of the high volume conditions by NHS Board, both in terms of admissions and
occupied beds days; and provided details of the potential reductions on occupied
beds days that Interface Care aims to achieve. Respiratory conditions, and in
particular COPD, was deemed as a high priority condition for NHS Lanarkshire. 
3.52 In order to support the implementation of new pathways for the conditions
identified, a number of enabling services were highlighted. These services were
identified for further development to support the delivery of the Interface Care
Programme’s aim to deliver a 20% reduction in length of stay, and provide high
quality and safe care for our target population. The two enabling services identified
for NHS Lanarkshire were Outpatient Parenteral Antibiotic Therapy (OPAT) and
H@H (as above). A summary of the work as part of the Lanarkshire Interface Care
Programme is described below. 
Review of COPD services

Page 16

16 
3.53 We know that many of our staff have been working differently in response to the
pandemic and consequently the time is now right to re-focus our service delivery
approaches and models. There are three distinct areas of focus of work underway
to develop a whole system respiratory pathway: 
 COPD prevention plan – focuses on prevention and early intervention of COPD. 
 Proactive Care – to increase the use of telehealth for symptom monitoring and
management and undertaking an audit to understand the detail of patient
journeys.
 Admission Avoidance and Supported Discharge – focuses on the implementation
of the SAS non-conveyancing pathway for COPD patients; formalising the H@H
response for patients with COPD; and implementation of Consultant Connect 
3.54  We have established a whole system Respiratory Speciality Improvement Group
and plan to use the development of the respiratory pathway as a blueprint for
pathway development across Lanarkshire; and implement and embed new models
or care and new ways of working as previously described. 
Outpatient Parenteral Antimicrobial Therapy (OPAT) Service Extension
3.55 OPAT services can release bed capacity by avoiding the need to admit patients
with infections requiring daily intravenous (IV) antibiotics who are otherwise well
enough not to need to be in hospital; and identifying patients who can be
discharged and therefore have a shorter length of stay once they are well enough
to return home and continue their daily IV treatment at home or at clinic. 
3.56 The NHS Lanarkshire OPAT Service currently delivers a Lanarkshire-wide service,
based at University Hospital Monklands, integrated with a community model
delivered by district nurses in the East Kilbride locality. The service has capacity
for 10 active patients, with flexibility to go up to 15. Additionally, an average of two
patients are treated at home through the East Kilbride locality service. The number
of bed days the Service saved in 2021 was 3,567, which equates to 9.8 beds at
100% occupancy. 
3.57 There is an opportunity to increase the capacity of the OPAT service to treat the
additional significant demand from patients currently in hospital beds
unnecessarily. Nationally collected data shows that if Bed Days Saved by the
current OPAT service is calculated as a rate per 100,000 of population, NHS
Lanarkshire currently has the lowest rate in Scotland.  If we were able to compare
with the best performing Board in Scotland, this has the potential to save 19,152
bed days a year which equates to 52.5 beds. 
3.58 Following consideration of a robust business case developed by staff drawn from
across our system, a recruitment process is underway to develop the University
Hospital Monklands OPAT Service and then develop the community based model.
The scope for optimising this is limited by the non-recurrent funding available
through the Interface Care Programme, and further consideration of this nationally
is needed. 
4. Conclusion 
4.1 This has been and continues to be the most challenging period that our health and
social care services have ever experienced. We recognise the impact, the distress
and the frustrations that this has for patients, service users, carers and

Page 17

17 
communities right across Lanarkshire – just as is the case right across Scotland.
We also understand how much we continue to ask of all staff right across our
services and across our partners. We are hugely grateful for their patience,
resilience and adaptability, and look forward to the continuing support of Board
Members, local elected members, local MSPs and local MPs – alongside Scottish
Government, COSLA and other national agencies - as we collectively progress the
important work ahead.