Item 7 - Primary Care Improvement Plan Update

North Lanarkshire Council · 16 November 2022
Back to IJB Performance, Finance and Audit Committee — 16 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

REPORT
Item No: 7
SUBJECT: New General Medical Services 2018/ Primary Care Improvement Plan
(PCIP) Update
TO: North Lanarkshire Integration Joint Board 
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Lucy Munro, Medical Director
Author(s)
of Report 
Linda Findlay, Medical Director, South Lanarkshire HSCP
DATE: 16th November 2022 
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
 update members on the progress of Primary Care Improvement Plan
implementation
For approval For endorsement  To note
2. ROUTE TO THE BOARD
This paper has been:
Prepared and approved by the South Lanarkshire IJB.
This paper has been:
Prepared  Reviewed Endorsed
3. RECOMMENDATIONS
The Integration Joint Board is asked to approve the following recommendation(s): -
1) That the report and progress is noted; and
2) That the proposed revitalised reporting regime be approved.
4. VARIATIONS TO DIRECTIONS?
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1  The purpose of general practice is to provide continuing, comprehensive,
coordinated and person-centred health care to patients in their communities. Since
the inception of the NHS, general practice has developed as an independent
contractor model. Most general practices are run as independent businesses and
provide services for NHS boards. On behalf of IJBs, NHS boards specify what
healthcare services they need and then fund the GPs to do this work through an
arrangement called the General Medical Services (GMS) contract. 
Yes  No  N/A

Page 2

5.2 The 2018 GMS Contract was developed by the Scottish General Practitioners
Committee (SGPC) of the British Medical Committee (BMA) and the Scottish
Government. The 2018 GMS Contract recognised the reality of projected general
practitioner numbers; and the value of a greater emphasis on care being provided by
multi-disciplinary teams. A Memorandum of Understanding (MOU) between the
Scottish Government, the BMA, IJBs and NHS Boards for the 2018 GMS contract
was agreed in April 2018. This MOU set out the principles by which primary care
redesign would be delivered. 
5.3 As a result of the 2018 Contract, all IJBs and Health Boards developed locally-
agreed Primary Care Improvement Plans (PCIPs). PCIPs were designed to support
the delivery of the national GMS contract aim of refocusing the role of GPs as expert
medical generalists, working with a wider team to provide more healthcare in the
community.
5.4 The initial Lanarkshire PCIP was agreed by NHS Lanarkshire, North and South
Lanarkshire IJBs and the NHS Lanarkshire GP Sub-Committee by the end of July
2018. South Lanarkshire Health and Social Care Partnership (HSCP) oversees the
implementation of the PCIP as part of its hosting arrangements. It was initially
agreed that PCIP progress would be formally reported on locally at six monthly
intervals, national reporting was annually. However, with the demands of the Covid-
19 pandemic, it was accepted that both the delivery of PCIPs would inevitably be
disrupted and delayed; and that reporting periods would be elongated. With the
move of the NHS into a remobilisation phase, this report is being brought forward to
revitalise more regularised and proportionate reporting.   
5.5 A revised MoU for the period 2021-2023 was published by Scottish Government in
July 2021.  This MOU 2 reaffirmed the direction of travel, revised delivery time scales
and brought in Transitionary Arrangements (payments) where Health Boards failed
to deliver the contract within the revised timescales. The focus of the MoU 2 remains
the delivery of the transfer of provision of service from general practice to HSCPs
and Health Boards, with a focus on the following three services for 2021-22:
 Vaccine Transformation Programme (VTP)
 Community Treatment and Care (CTAC)
 Pharmacotherapy
6. PCIP Progress
Pre-Pandemic
6.1 Pre-pandemic Lanarkshire’s position was a strong one. This was achieved by a
programme underpinned by a clear governance structure; that utilised project
management and quality improvement, with an evaluation framework in place from
the commencement; and a dedicated improvement and general management
resource. 
6.2  Progress During the Pandemic
Whilst the first wave of the pandemic saw the standing down of the PCIP, the
structure that was in place allowed for the stepping back up in May 2021 (as
resources allowed) enabling the reviewing and revision of project plans. The
resulting planning and preparatory work undertaken enabled continued progress to
be made on delivery as soon as system pressures allowed.

Page 3

6.3 Progress on the three Prioritised Areas
6.3.1 Vaccination Transformation Programme (VTP) - was fully achieved and service
provision transferred over (April 2022).
6.3.2 Community Treatment and Care (CTAC) – all aspects of agreed Treatment Room
Services were implemented, albeit operating at the levels effected by Covid.  There
has been progress with the initiation of a test of change for Chronic Disease
Monitoring (CDM) put in place from May 2022 to date (as at 22 August 2022) with
discussions underway to progress a Lanarkshire-wide roll out programme between
September 2022 and March 2023.  A learning report from the test of change is being
prepared to enable and inform systems and processes that are required for the
successful transfer of CDM from April 2023.
6.3.3 Pharmacotherapy – there has been steady progress of the Lanarkshire model,
which (as with the national picture) has been adversely affected by available funding
and workforce.  The model allows 1 whole time equivalent (WTE) Pharmacist per
15,000 patient list size (some larger practices also benefit from technician resource),
plus the development of a Pharmacotherapy HUB model. The latter utilises a staffing
mix of Technicians and Pharmacy Support Workers to support with the delivery of a
Level One Pharmacotherapy Service.  A project plan is in place for the continuation
of the implementation of this model in 2022-23, and this will be informed and revised
by a Pharmacotherapy Quality Improvement Group. This group was established
following an audit during 2022 that determined current levels of delivery, and has the
remit to develop optimised process.
6.4 PCIP Reporting Status
A RAG report is maintained against the three priority workstreams. The position as of
22 August 2022 is detailed in Appendix 1.
6.5 Progress on Other Areas 
Additional Professional Services:
6.5.1 The GP Community Link Worker programme is now fully implemented across
Lanarkshire.  Every practice has access to both generic and financial and welfare
link workers.
6.5.2 The redesign of the Challenging Patients Service - now the Challenging Behaviour
Service (CBS) - has seen a more sustainable model developed and become
operational.  This Service provides General Medical Services to patients who for a
variety of reasons cannot have services delivered in mainstream general practice.
6.5.3 A small cohort of Advance Practice Physiotherapists (APPs) is in place, with
learning being captured to inform future model should funding allow.
6.5.4 The growth and development of our Advance Practice Nurse (APN) workforce,
testing relating to the urgent care model are being undertaken.
6.6 Urgent Care (delivery due 2023/24):
6.6.1 The Urgent Care in Hours Workstream was stepped back up in February 2022 with
an initial remit of reviewing the appropriateness of the agreed pre-pandemic model:
i.e. to recruit, train and deploy an ANP team to deliver on patients’ requests for
urgent GP home visiting.

Page 4

6.6.2 The pandemic saw the redeployment of ANPs to support the Covid Assessment
Service; and then on stepping this down, redeployment of those staff to practices in
two geographic areas - Cumbernauld and East Kilbride. This redeployment gave the
opportunity for a Test of Change in respect of ANP delivery across a number of
practices. 
6.6.3 In March 2022 the Workstream group commissioned a number of pieces of work to
review the context of urgent care delivery and inform the GMS Oversight Executive
Group regarding a future plan for sustainable GP Urgent Care-in-Hours delivery. 
The findings of this significant scoping exercise was as follows: 
 Delivery definition remains “Initial Clinical Assessment and the Primary Care
Management of unscheduled medical, surgical and mental health urgent issues '
 The biggest challenge to service delivery is public behaviour, confusion and
perception as to where to present in an increasingly complex and disconnected array
of choices with “go to your GP” often perceived as the default
 Current PCIP ANPs and general practice staff are spread too thinly to deliver or
collaborate effectively on changes to service delivery.  There is no anticipated
immediate solution to this workforce challenge and there is an acknowledgement that
this is likely to persist into the next three-to-five-year planning period
 Requests for GP input to patients recently discharged from hospital and those with
multiple complexity have increased exponentially largely as a result of changes in
systems external to GP practices themselves.  Co-location, adequate workspace and
IT are essential to be in place prior to service go live to reduce journey times and
inefficiencies
6.6.4 The following recommendations are now being linked with the wider urgent care
redesign and will be progressed to realise delivery by the revised MoU date of 2023-
24:
 Consolidation of the current, available GMS urgent care provision.  Criteria for this is
to be clarified but must include sufficient space, infrastructure, and appropriate IT for
the service to deliver its roles
 Progressing an exit strategy from the current model; and, based on review of
evidence and outcomes of commissioned work to-date, that a revised Urgent Care
in-Hours Service is progressed
 That the service should not be solely dependent on the PCIP ANP workforce but is
seen as a whole system model with dedicated input from the wider Partnerships and
NHSL secondary care (including the Flow Navigation Centre), administrative and
quality improvement support plus protected professional leadership.  This would be
required to ensure the project achieves its aims of reducing GP workload to allow
them to more safely provide existing service against a background of ever-increasing
demand
 The development of services should be underpinned by quality improvement and co-
produced, which will ensure engagement with GPs and all partners (including
patients) to allow them to influence development
 That it is recognised that significant public and system engagement is required to
challenge unrealistic expectations of ‘go see your GP’, as such that any changes will
be accompanied by a communications plan which includes key messages to help the
public understand the most appropriate healthcare service for them to attend.  Key
messages are already being shared with stakeholders to maximise the audience
reached.

Page 5

6.7 Evaluation
The PCIP in Lanarkshire is an ambitious transformational programme.  Evidence is
needed to demonstrate how effectively the agreed outcomes are being achieved.  As
previously agreed, a contribution analysis approach to this evaluation as
recommended in the National Monitoring and Evaluation Strategy is being applied. 
The national outcome frameworks - for people using Primary Care, the workforce,
and the system as a whole - will be used to collate evidence of their achievement. 
6.8  Communication and Engagement
A Communication and Engagement Strategy is in place for PCIP, specifically to
focus on ensuring that there are:
 Engaged and knowledgeable GPs and general practice teams
 Engaged and knowledgeable wider health and social care system
 Engaged and knowledgeable public
6.9    Conclusion
6.9.1 While it is evident that progress continues to be made - with plans in place, including
where necessary mitigation in response to challenges - there remains clear risks to
the overall delivery of the PCIP. The unprecedented scale of change resulting from
managing the response to the pandemic has created new opportunities and
challenges in delivering on-going reform of Primary Care and the PCIP.  As such,
across the PCIP, consistent review and appropriate revision is being made along
with mitigation specifically focused on addressing these areas. 
6.9.2 Given this, a twice-yearly reporting regime is proposed with an annual overview
presented to the IJB in the autumn (to correspond with annual reporting submissions
to Scottish Government) and an interim report presented to the Performance and
Audit Sub-Committee in-year. These reports will also be shared with the Population
Health & Primary Care and Community Care Governance Sub-Committee of the
NHS Lanarkshire Board.
7.1 NATIONAL OUTCOMES
The PCIP workstream impact on all nine national outcomes. 
7.2 ASSOCIATED MEASURE(S)
The activity described within this report contributes to mitigation of a number of
identified risks within the NHS Lanarkshire risk register, notably ability to maintain
existing GMS across NHS Lanarkshire.
There are emerging risks associated with the overall Plan as well as individual
workstreams.  Each PCIP work stream has an individual Risk Register which feed to
an overarching risk register for the programme, the highest rated risks remain
around workforce, funding and infrastructure.  An agreed project plan underpins the
ongoing delivery of the PCIP and the mitigation of these risks.
7.3 CLIMATE CHANGE, SUSTAINABILITY AND ENVIRONMENTAL IMPLICATIONS
Where clinically appropriate tele-health is being used across models. Where
resource allows, there is a mix of CTAC delivery across treatment rooms; and a
peripatetic approach to reduce patient travel.

Page 6

7.4  FINANCIAL
Financially, implementation of the PCIP is complex.  It requires a balance in
expenditure between different workstreams, recycling of existing expenditure and
efficiency of “back office” functions.  Despite review and skill mixing the PCIP is not
fully deliverable within the financial envelope indicated and this has been highlighted
to Scottish Government.  
This paper has been reviewed by Finance:
Yes   No  N/A
7.5 RISK ASSESSMENT/RISK MANAGEMENT 
GP sustainability sits on the IJB and NHSL Risk Registers. 
7.6  PEOPLE
This report contributes to the performance measurement approach committed within
the current IJB Strategic Commissioning Plan. The areas of performance described
within this report contribute to the delivery of a number of strategic priorities within
the current IJB Strategic Commissioning Plan, notably: 
 Sustaining statutory social care and core health care functions
 Improving unscheduled care and increasing intermediate care
The intention of the GMS contract, the MoU and the local PCIP taken together is to allow
clinicians to work at a high level in expanded and integrated teams.  This will have
implications for many employees over the coming years and should be broadly welcomed
by all involved.  There are implications for those in changing roles, the development of new
roles and the need to explore Transfer of Undertakings (Protection of Employment) (TUPE)
for a number of, but not all staff currently employed by GPs.  For example, the contract is
explicit about the development of Practice Nursing and Practice Manager roles, both of
which will remain practice employees.
7.7 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed:
Yes  No  N/A
There is no requirement to carry out an Equality Impact Assessment in terms of the
proposals contained within this report.  However, consultation will continue to be
extensive.  The EQIA for the programme is being refreshed.
7.7.1  Consultation and engagement across a wide range of stakeholders is pivotal to the
successful implementation of the PCIP. 
8. BACKGROUND PAPERS
List of Background Papers
 Audit Scotland (2019) General Medical Services contract in Scotland: A short guide
https://www.audit-
scotland.gov.uk/uploads/docs/report/2019/briefing_190516_general_medical_services.
pdf

Page 7

 The national GMS Memorandum of Understanding 2:
https://www.sehd.scot.nhs.uk/publications/Memorandum_of_Understanding%202-
GMS_Contract_Implementation_for_PC_Improvement%2030_July_2021.pdf
9. APPENDICES
Appendix 1 South Lanarkshire IJB Report
Appendix 2 RAG Status 
Appendix 3 GMS Oversight Exec 
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Members seeking further information about any aspect of this report, please contact the
following;
Lucy Munro on telephone number 01698 752 751
Lucy.munro@lanarkshire.scot.nhs.net

Page 8

Report
Report to: South Lanarkshire Integration Joint Board
Date of Meeting: 20 September 2022
Report by: Director, Health and Social Care  
Subject: Primary Care Improvement Plan - Update
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 update members on the progress of Primary Care Improvement Plan
implementation
[1purpose]
2. Recommendation(s)
2.1. The Integration Joint Board is asked to approve the following recommendation(s):-
[recs]
(1) that the report and progress is noted; and
(2) that the proposed revitalised reporting regime be approved.
[1recs]
3. Background
3.1. The purpose of general practice is to provide continuing, comprehensive,
coordinated and person-centred health care to patients in their communities. Since
the inception of the NHS, general practice has developed as an independent
contractor model. Most general practices are run as independent businesses and
provide services for NHS boards. On behalf of IJBs, NHS boards specify what
healthcare services they need and then fund the GPs to do this work through an
arrangement called the General Medical Services (GMS) contract. 
3.2 The 2018 GMS Contract was developed by the Scottish General Practitioners
Committee (SGPC) of the British Medical Committee (BMA) and the Scottish
Government. The 2018 GMS Contract recognised the reality of projected general
practitioner numbers; and the value of a greater emphasis on care being provided by
multi-disciplinary teams. A Memorandum of Understanding (MOU) between the
Scottish Government, the BMA, IJBs and NHS Boards for the 2018 GMS contract
was agreed in April 2018. This MOU set out the principles by which primary care
redesign would be delivered. 
3.3 As a result of the 2018 Contract, all IJBs and Health Boards developed locally-
agreed Primary Care Improvement Plans (PCIPs). PCIPs were designed to support
the delivery of the national GMS contract aim of refocusing the role of GPs as expert
medical generalists, working with a wider team to provide more healthcare in the
community.
Appendix 1

Page 9

3.4 The initial Lanarkshire PCIP was agreed by NHS Lanarkshire, North and South
Lanarkshire IJBs and the NHS Lanarkshire GP Sub-Committee by the end of July
2018. South Lanarkshire Health and Social Care Partnership (HSCP) oversees the
implementation of the PCIP as part of its hosting arrangements. It was initially
agreed that PCIP progress would be formally reported on locally at six monthly
intervals, national reporting was annually. However, with the demands of the Covid-
19 pandemic, it was accepted that both the delivery of PCIPs would inevitably be
disrupted and delayed; and that reporting periods would be elongated. With the
move of the NHS into a remobilisation phase, this report is being brought forward to
revitalise more regularised and proportionate reporting.   
3.5 A revised MoU for the period 2021-2023 was published by Scottish Government in
July 2021.  This MOU 2 reaffirmed the direction of travel, revised delivery time scales
and brought in Transitionary Arrangements (payments) where Health Boards failed
to deliver the contract within the revised timescales. The focus of the MoU 2 remains
the delivery of the transfer of provision of service from general practice to HSCPs
and Health Boards, with a focus on the following three services for 2021-22:
 Vaccine Transformation Programme (VTP)
 Community Treatment and Care (CTAC)
 Pharmacotherapy
4. PCIP Progress
Pre-Pandemic
4.1 Pre-pandemic Lanarkshire’s position was a strong one. This was achieved by a
programme underpinned by a clear governance structure; that utilised project
management and quality improvement, with an evaluation framework in place from
the commencement; and a dedicated improvement and general management
resource. 
Progress During the Pandemic
4.2 Whilst the first wave of the pandemic saw the standing down of the PCIP, the
structure that was in place allowed for the stepping back up in May 2021 (as
resources allowed) enabling the reviewing and revision of project plans. The
resulting planning and preparatory work undertaken enabled continued progress to
be made on delivery as soon as system pressures allowed.
Progress on the three Prioritised Areas
6.9 VTP - was fully achieved and service provision transferred over (April 2022).
6.10 CTAC – all aspects of agreed Treatment Room Services were implemented, albeit
operating at the levels effected by Covid.  There has been progress with the initiation
of a test of change for Chronic Disease Monitoring (CDM) put in place from May
2022 to date (as at 22 August 2022) with discussions underway to progress a
Lanarkshire-wide roll out programme between September 2022 and March 2023.  A
learning report from the test of change is being prepared to enable and inform
systems and processes that are required for the successful transfer of CDM from
April 2023.

Page 10

6.11 Pharmacotherapy – there has been steady progress of the Lanarkshire model,
which (as with the national picture) has been adversely affected by available funding
and workforce.  The model allows 1 whole time equivalent (WTE) Pharmacist per
15,000 patient list size (some larger practices also benefit from technician resource),
plus the development of a Pharmacotherapy HUB model. The latter utilises a staffing
mix of Technicians and Pharmacy Support Workers to support with the delivery of a
Level One Pharmacotherapy Service.  A project plan is in place for the continuation
of the implementation of this model in 2022-23, and this will be informed and revised
by a Pharmacotherapy Quality Improvement Group. This group was established
following an audit during 2022 that determined current levels of delivery, and has the
remit to develop optimised process.
PCIP Reporting Status
6.12 A RAG report is maintained against the three priority workstreams. The position as of
22 August 2022 is detailed in Appendix 1.
Progress on Other Areas
6.13 Additional Professional Services:
6.13.1 The GP Community Link Worker programme is now fully implemented across
Lanarkshire.  Every practice has access to both generic and financial and welfare
link workers.
6.13.2 The redesign of the Challenging Patients Service - now the Challenging Behaviour
Service (CBS) - has seen a more sustainable model developed and become
operational.  This Service provides General Medical Services to patients who for a
variety of reasons cannot have services delivered in mainstream general practice.
6.13.3 A small cohort of Advance Practice Physiotherapists (APPs) is in place, with
learning being captured to inform future model should funding allow.
6.13.4 The growth and development of our Advance Practice Nurse (APN) workforce,
testing relating to the urgent care model are being undertaken.
6.14 Urgent Care (delivery due 2023/24):
6.14.1 The Urgent Care in Hours Workstream was stepped back up in February 2022 with
an initial remit of reviewing the appropriateness of the agreed pre-pandemic model:
i.e. to recruit, train and deploy an ANP team to deliver on patients’ requests for
urgent GP home visiting. 
6.14.2 The pandemic saw the redeployment of ANPs to support the Covid Assessment
Service; and then on stepping this down, redeployment of those staff to practices in
two geographic areas - Cumbernauld and East Kilbride. This redeployment gave the
opportunity for a Test of Change in respect of ANP delivery across a number of
practices. 
6.14.3 In March 2022 the Workstream group commissioned a number of pieces of work to
review the context of urgent care delivery and inform the GMS Oversight Executive
Group regarding a future plan for sustainable GP Urgent Care-in-Hours delivery. 
The findings of this significant scoping exercise was as follows:

Page 11

 Delivery definition remains “Initial Clinical Assessment and the Primary Care
Management of unscheduled medical, surgical and mental health urgent issues '
 The biggest challenge to service delivery is public behaviour, confusion and
perception as to where to present in an increasingly complex and disconnected array
of choices with “go to your GP” often perceived as the default
 Current PCIP ANPs and general practice staff are spread too thinly to deliver or
collaborate effectively on changes to service delivery.  There is no anticipated
immediate solution to this workforce challenge and there is an acknowledgement that
this is likely to persist into the next three-to-five-year planning period
 Requests for GP input to patients recently discharged from hospital and those with
multiple complexity have increased exponentially largely as a result of changes in
systems external to GP practices themselves.  Co-location, adequate workspace and
IT are essential to be in place prior to service go live to reduce journey times and
inefficiencies
6.14.4 The following recommendations are now being linked with the wider urgent care
redesign and will be progressed to realise delivery by the revised MoU date of 2023-
24:
 Consolidation of the current, available GMS urgent care provision.  Criteria for this is
to be clarified but must include sufficient space, infrastructure, and appropriate IT for
the service to deliver its roles
 Progressing an exit strategy from the current model; and, based on review of
evidence and outcomes of commissioned work to-date, that a revised Urgent Care
in-Hours Service is progressed
 That the service should not be solely dependent on the PCIP ANP workforce but is
seen as a whole system model with dedicated input from the wider Partnerships and
NHSL secondary care (including the Flow Navigation Centre), administrative and
quality improvement support plus protected professional leadership.  This would be
required to ensure the project achieves its aims of reducing GP workload to allow
them to more safely provide existing service against a background of ever-increasing
demand
 The development of services should be underpinned by quality improvement and co-
produced, which will ensure engagement with GPs and all partners (including
patients) to allow them to influence development
 That it is recognised that significant public and system engagement is required to
challenge unrealistic expectations of ‘go see your GP’, as such that any changes will
be accompanied by a communications plan which includes key messages to help the
public understand the most appropriate healthcare service for them to attend.  Key
messages are already being shared with stakeholders to maximise the audience
reached.
Evaluation
4.9 The PCIP in Lanarkshire is an ambitious transformational programme.  Evidence is
needed to demonstrate how effectively the agreed outcomes are being achieved.  As
previously agreed, a contribution analysis approach to this evaluation as
recommended in the National Monitoring and Evaluation Strategy is being applied. 
The national outcome frameworks - for people using Primary Care, the workforce,
and the system as a whole - will be used to collate evidence of their achievement.

Page 12

Communication and Engagement
4.10 A Communication and Engagement Strategy is in place for PCIP, specifically to
focus on ensuring that there are:
 Engaged and knowledgeable GPs and general practice teams
 Engaged and knowledgeable wider health and social care system
 Engaged and knowledgeable public
Conclusion
4.11 While it is evident that progress continues to be made - with plans in place, including
where necessary mitigation in response to challenges - there remains clear risks to
the overall delivery of the PCIP. The unprecedented scale of change resulting from
managing the response to the pandemic has created new opportunities and
challenges in delivering on-going reform of Primary Care and the PCIP.  As such,
across the PCIP, consistent review and appropriate revision is being made along
with mitigation specifically focused on addressing these areas. 
4.12 Given this, a twice-yearly reporting regime is proposed with an annual overview
presented to the IJB in the autumn (to correspond with annual reporting submissions
to Scottish Government) and an interim report presented to the Performance and
Audit Sub-Committee in-year. These reports will also be shared with the Population
Health & Primary Care and Community Care Governance Sub-Committee of the
NHS Lanarkshire Board.
5. Employee Implications
5.1. The intention of the GMS contract, the MoU and the local PCIP taken together is to
allow clinicians to work at a high level in expanded and integrated teams.  This will
have implications for many employees over the coming years and should be broadly
welcomed by all involved.  There are implications for those in changing roles, the
development of new roles and the need to explore Transfer of Undertakings
(Protection of Employment) (TUPE) for a number of, but not all staff currently
employed by GPs.  For example, the contract is explicit about the development of
Practice Nursing and Practice Manager roles, both of which will remain practice
employees.
6. Financial Implications
6.1. Financially, implementation of the PCIP is complex.  It requires a balance in
expenditure between different workstreams, recycling of existing expenditure and
efficiency of “back office” functions.  Despite review and skill mixing the PCIP is not
fully deliverable within the financial envelope indicated and this has been highlighted
to Scottish Government.  
7. Climate Change, Sustainability and Environmental Implications
7.1. Where clinically appropriate tele-health is being used across models. Where
resource allows, there is a mix of CTAC delivery across treatment rooms; and a
peripatetic approach to reduce patient travel.
8. Other Implications
8.1. This report contributes to the performance measurement approach committed within
the IJB Strategic Commissioning Plan 2022-25. The areas of performance described
within this report contribute to the delivery of a number of strategic priorities within
the IJB Strategic Commissioning Plan 2022-25, notably:

Page 13

 Sustaining statutory social care and core health care functions
 Improving unscheduled care and increasing intermediate care
8.2 The activity described within this report contributes to mitigation of a number of
identified risks within the NHS Lanarkshire risk register, notably ability to maintain
existing GMS across NHS Lanarkshire.
8.3  There are emerging risks associated with the overall Plan as well as individual
workstreams.  Each PCIP work stream has an individual Risk Register which feed to
an overarching risk register for the programme, the highest rated risks remain
around workforce, funding and infrastructure.  An agreed project plan underpins the
ongoing delivery of the PCIP and the mitigation of these risks.
9. Equality Impact Assessment and Consultation Arrangements
9.1. There is no requirement to carry out an Equality Impact Assessment in terms of the
proposals contained within this report.  However, consultation will continue to be
extensive.  The EQIA for the programme is being refreshed.
9.2. Consultation and engagement across a wide range of stakeholders is pivotal to the
successful implementation of the PCIP. 
10. Directions
10.1.
Direction to:
1. No Direction required
2. South Lanarkshire Council
3. NHS Lanarkshire
4. South Lanarkshire Council and NHS Lanarkshire
Soumen Sengupta
Director, Health and Social Care 
Date created: 1 September 2022
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing and live in
good health for longer
People, including those with disabilities or long-term conditions, or who are frail, are
able to live, as far as reasonable practicable, independently and at home or in a
homely setting in their community
People who use Health and Social Care Services have positive experiences of those
services, and have their dignity respected
Health and Social Care Services are centred on helping to maintain or improve the
quality of life of people who use those services
Health and Social Care Services contribute to reducing health inequalities

Page 14

People who provide unpaid care are supported to look after their own health and
wellbeing, including to reduce any negative impact of their caring role on their own
health and wellbeing
People who use Health and Social Care Services are safe from harm
People who work in Health and Social Care Services feel engaged with the work they
do and are supported to continuously improve the information, support, care and
treatment they provide
Resources are used effectively and efficiently in the provision of Health and Social
Care Services
Previous References
 none
List of Background Papers
 Appendix 1 – Lanarkshire PCIP RAG status
 Audit Scotland (2019) General Medical Services contract in Scotland: A short guide
https://www.audit-
scotland.gov.uk/uploads/docs/report/2019/briefing_190516_general_medical_services.
pdf
 The national GMS Memorandum of Understanding 2:
https://www.sehd.scot.nhs.uk/publications/Memorandum_of_Understanding%202-
GMS_Contract_Implementation_for_PC_Improvement%2030_July_2021.pdf
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Name: Linda Findlay, Medical Director
Phone:  01698 453844 
Email: Linda.Findlay@lanarkshire.scot.nhs.uk

Page 15

Appendix 2
Lanarkshire Primary Care Improvement Plan:
RAG Reporting Status (March 2022)
Service Lanarkshire Service Progress RAG
Vaccine
Transformation
Programme (VTP)
Pre-school programme
NHS Lanarkshire had an established pre-school programme, pre
2018, delivered by managed services (health visiting).
G
School based programme
Stat
NHS Lanarkshire had an established school based programme, pre
2018, delivered by managed services (school immunisation team).
A process for out of schedule has been confirmed.
G
Travel vaccination and travel health advice
NHS Lanarkshire has procured a service provision via Community
Pharmacy Lanarkshire.  Since April 2022, there are 7 community
pharmacists now offering a travel health vaccination and advise
service to residents of and registered patients with a GP across
Lanarkshire.  There is continued engagement with additional
community pharmacies to be contracted in across NHS Lanarkshire to
offer this service.  
G
Mass Vaccination Programme (MVP)
 The delivery of public (children and adults) and staff influenza
vaccination programme in tandem with covid19 booster is now in
place. 
 Pneumococcal, and Shingles vaccinations are being progressed for
delivery via the respective vaccination centres set up to deliver covid
and influenza vaccines.  
 Pneumococcal vaccine offer will be completed August 2022.
Following this, there will be a pilot for people aged 79 and over
whose eligibility is about to expire. People will receive a letter with
details of their appointment and alternative arrangements if it is not
suitable. Learning from this pilot will inform a wider roll-out of the
shingles vaccine in early 2023, after the covid-19 booster and flu
vaccination programmes have completed. The wider roll-out will
include all other eligible people and those who have not had an
opportunity to receive the shingles vaccine due to covid.
 There are a number of adhoc vaccinations which require to be
delivered, mostly coming from secondary care (for example,
patients who need further vaccination after a bone marrow
transplant, or patients requiring pneumococcal vaccine outside of
usual scheduled vaccinations due to commencing
immunosuppressant’s). Referrals are being received and a process
has been developed for these patients to receive their vaccination
G

Page 16

in Ravenscraig vaccination centre. Once processes are mature, it
would be intended to deliver this across all vaccination centres.
Feedback was received from some GP practices that they were
receiving requests from non-Lanarkshire secondary care
departments for Lanarkshire residents. Discussions have taken
place with colleagues in other WoS boards and an agreement
reached to ensure information on all WoS referral pathways
disseminated to relevant departments. Further contact between the
Vaccination Service and specific departments (specifically
haemato-oncology) has taken place. 
Community
Treatment and
Care (CTAC)
NHS Lanarkshire benefited from an established Treatment Room
Services (TRS) provision across all Localities, PCIP has invested
additional resource to enhance board wide TRS to enable transfer of 
• Phlebotomy,
• The management of minor injuries and dressings,
• Ear syringing, and
• Suture removal.
There is a need to be cognisant that plans are being progressed in line
with current Treatment Room Services provision which is affected by
covid pandemic.
There is an allocation of 49WTE Band 5 community nurses to support
CTAC. In order to achieve the locality allocation levels, recruitment has
been completed from Band 5 nursing staff previously deployed to the
Mass Vaccination Programme returning, newly qualified nurses and
external recruitment programmes underway in respective localities.   
G
Chronic disease monitoring
• Basic disease data collection and biometrics (such as blood
pressure)
A test of change is currently underway within the Hamilton Locality with
4 volunteer general practices involved currently to gather data and
learning of the proposed CDM model to inform a future model for Board
wide implementation by March 2023 using the Vision Anywhere system.
There is the intention to recruit additional GP practices within this
locality to further support the gathering of required intelligence. 
There has been positive feedback from staff, patients and general
practice teams on the test of change to date.
A
Pharmacotherapy A clear model has been approved which will utilise a skill mix of
Pharmacists, Pharmacy Technicians and Pharmacy Support Workers
to provide a pharmacotherapy service delivered via practice based staff
(1wte per 15,000 patients) and locality hubs. This model has been
identified as the optimum delivery approach, within the available funding
allocation, to progress towards achievement of what is outlined in the
GMS contract as a full pharmacotherapy service. 
The contract offer details three levels of pharmacotherapy service and
while there is an emphasis on implementing the level one element there
are interdependencies between all three levels that require focus on the
R

Page 17

delivery of the service as a whole, currently all practices receive a partial
service.
The quality improvement workgroup has been established and is
progress recommendations identified in the June 2021 regarding
variation and opportunities to ensure optimum service delivery.
There are challenges relating to accommodation for hubs, with
currently 5 Localities not having identified accommodation, this has
been escalated via Board and HSCP structures.

Page 18

1 
Oversight Executive Group ToR v0.1 
Terms of Reference 
1. Title
NHS Lanarkshire GMS2018 Oversight Executive Group 
2. Reporting and Accountability
The group reports to and is accountable to The Primary Care Strategy Board 
3. Purpose
The objective of this work stream is to oversee and decide on matters relating to all the work 
streams for GMS2018 which require more senior agreement to progress in line with the mandate 
of the General Medical Services (GMS) 2018 contract. Decisions may be taken by the group or 
remitted to the Primary Care Strategy Board (PCSB). 
4. Key Responsibilities and Objectives
The roles and responsibilities of the NHS Lanarkshire GMS2018 Oversight Executive Group are as 
described below: 
 Write and ensure adherence to the overarching Primary Care Improvement Plan (PCIP);
 Provide subject matter expertise plus links to other groups;
 Facilitate resolution of any disagreement or disputes between work stream leads and its
members;
 Approve documentation and processes as appropriate to reflect the work stream plans;
 Provide advice and approve key decisions as required;
 Manage any project interdependencies and identify and recognise synergies with work
ongoing at both a local and national level, including but not limited to, other GMS2018
work streams;
 Manage any risks and issues in relation to the implementation of GMS2018 services;
 Inform the risk register maintained by the Primary Care Improvement Team;
 Ensure members take responsibility for, and lead where appropriate on, relevant activities
and report on progress to the group;
 Ensure members consult more broadly within their organisation / professional group on
areas of particular interest to the group, and therefore create a feedback process.
Appendix 3

Page 19

2 
Oversight Executive Group ToR v0.1 
5. Membership
Organisation/Division  Responsibilities 
Medical Director, South HSCP   Chair of the GMS Oversight Executive
Group
 Provide link to Urgent Care (in hours)
Group
 Provide links and advice in regards to
Lanarkshire Health & Social Care
Partnerships
 Medical subject matter expert
Medical Director, North HSCP   Provide links and advice in regards to
Lanarkshire Health & Social Care
Partnerships
 Link to Community Treatment & Care
Modelling & Planning Group
Associate Medical Director, South HSCP  Provide links and advice in regards to
Lanarkshire Health & Social Care
Partnerships
Associate Medical Director, North HSCP  Provide links and advice in regards to
Lanarkshire Health & Social Care
Partnerships
Director of Nursing, North/South HSCP  Provides nursing expertise and links to
senior nursing management in NHSL &
HSCPs
2x GP Sub Committee representatives   Represent the interests of primary care
doctors
 Provide communication & engagement
links to Lanarkshire GP Sub committee
Head of Health, South HSCP   Provides operational links to South HSCP
Head of Health, North HSCP   Provides operational links to North HSCP
Head of Commissioning & Planning, South 
HSPC/Interim Head of Commissioning & 
Planning, North HSCP 
 Provide strategic commissioning and
planning links to HSCPs
Deputy Director of Finance   Provides financial expertise
 Monitors PCIP finances
 Provides links to national finance groups
Primary Care Services Manager   Provides links to General Practices in
Lanarkshire
Service Manager, Primary Care Improvement 
Plan (PCIP) 
 Provides links to PCIP work stream
operational issues
Senior Improvement Manager, Primary Care 
Improvement Team 
 Provides improvement methodology
expertise and links to the PCIP Support
Team
Project Support Officer, PCIP   Schedules meetings
 Produces action & decision log

Page 20

3 
Oversight Executive Group ToR v0.1 
The Group shall have the right to invite representatives and expertise to any of its meetings when 
deemed appropriate. 
 
6. Conduct of Business (Frequency, reporting, Quorum, Chair/deputy, agenda, 
minutes, actions, ToR review) 
 
 Chair: The Medical Directors shall act as Co‐Chairs with a GP Sub representative as Vice 
Chair with the authority to nominate a deputy in their absence. 
 Decision Making: The three‐year action plans for all work streams will be developed with 
the project leads and subject matter experts.  Following an iterative development 
process, these will be collated into the Primary Care Improvement Plan (PCIP).  Changes 
to the PCIP will be through the GMS Oversight Executive Group and identified lead 
author.  Any such change shall only become operative after approval of the Chair of the 
Group in consultation with the Primary Care Strategy Board (PCSB). 
The GMS Oversight Executive Group will take decisions as often as possible within the 
Group to ensure progress of work streams in accordance with the established principles 
of implementation, as agreed by PCSB. Where sufficient clarity does not exist, decisions 
will be required by the PCSB.  It is hoped that by including the key responsible officers 
within the meeting, there will be sufficient capacity to agree a way forward. 
 Meeting Frequency: Meetings will take place 4 weekly with a review of the frequency 
taking place by the chair at an appropriate stage. Meetings will be two weeks after and two 
weeks before the PCSB. Meetings of this group will last approximately 2 hours and the 
appropriate quorum of membership is at the discretion of the Chair. 
 Meeting Organisation: The Chair, in collaboration with the Project Support Officer will be 
responsible for arranging meetings, issuing and managing calendar invitations and 
associated tasks.  All meetings should be arranged in line with the agreed frequency as 
set out within the group ToR and calendar invitations should be issued to group members 
up to 1 year in advance.
 Agenda/Papers: Agendas and relevant papers should be developed by the Project 
Support Officer; Decisions and actions from the meeting will be recorded within an action 
and decision log. It is the responsibility of each of the members to ensure actions 
assigned to them are completed and an update provided.  
The agenda will be managed by the Chair with input from Vice Chair and agenda items 
shall be given one week in advance of the meeting.  A Highlight Report updating the 
progress of each of the work stream groups will be circulated prior to each meeting.  
Detailed minutes will not be produced; rather action points and timescales will be 
circulated within one week of the meeting. 
The LanGMS2018 mailbox (LanGMS2018@lanarkshire.scot.nhs.uk) should be included 
within all meeting invitations and relevant correspondence including meeting papers. A 
distribution list should be maintained by the Project Support Officer ensuring all invitees/ 
recipients are required and removing/adding those who no longer require to receive 
correspondence in regards to the group.  
 Meeting Delivery: The Project Support Officer (PSO) will attend all group meetings to 
develop and maintain action and decision log. The PSO is responsible for version control 
and accuracy of the decision log and will be responsible for following up with action 
owners to provide updates on outstanding actions. The PSO will also be responsible for 
ensuring the most up to date action note document is provided prior to the next meeting 
for circulation alongside other relevant meeting papers to the members of the group. 
A nominated group member will capture actions and decisions in the PSOs absence. An 
up‐to‐date action log will be contained within the papers for the meeting. This should be

Page 21

4 
Oversight Executive Group ToR v0.1 
updated following the meeting and a new version dd‐mm‐yyyy draft v0.1 created for the 
date of the meeting.  A final version dd‐mm‐yyyy v1.0 will be created following approval 
by the project lead(s) and circulated to group members no later than one week after the 
meeting. 
 ToR Review: Changes to the ToR, functions or membership of the group may be proposed 
at any meeting of the group with due notice of the proposed change having been issued 
with the agenda of the meeting.  Any such change shall only become operative after 
approval of the Chair of the Group in consultation with the Primary Care Strategy Board.  
 Lifespan: This group will meet until April 2023 in line with the revised timescales set out 
within the GMS2018 contract. 
 
7. Confidentiality 
 
Organisation confidentiality will be maintained.  Any papers resulting from these meetings will be 
open to public scrutiny. 
 
8. Review Date 
 Date of review – 21/09/2022 
 Date of approval at GMS Oversight Executive Group ‐  
 Date of next review – 21/09/2023 or earlier as referenced in section 6 – ToR Review