REPORT 
Item No: 7 
SUBJECT: Performance Update – 01st April 2025 to 30th June 2025, Quarter 1
2025/26 
TO: Integration Joint Board Performance, Finance & Audit Committee
Lead
Officer for
Report:
Morag Dendy, Head of Planning, Performance and Quality
Assurance 
Author(s) of
Report
Stephen Forrest, Performance Manager
DATE: 22 October 2025 
1. PURPOSE OF REPORT 
This paper is coming to the IJB for: 
For approval ☐ For endorsement ☐ To note ☒ 
2. ROUTE TO THE BOARD 
This paper has been: 
Prepared By: ☒ Reviewed By: ☒ Endorsed By: ☐
Prepared by:      
Performance Manager 
Reviewed by: 
Senior Manager, Strategy
& Performance

Page 2

2 
3. RECOMMENDATIONS
It is recommended that the IJB/IJB PFA Committee:
(1) Note the contents of the report and the appendix. 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
The Chief Officer has joint quarterly performance review meetings with the Chief Executives
of NHS Lanarkshire and North Lanarkshire Council. These meetings are supported by a
Chief Executives Performance Framework comprising a range of performance measures
taken from across both the health and social work systems, including relevant targets and
trajectories for the measures presented. 
Each quarter there are areas for improvement identified within the performance framework;
these are identified using a RAG rating and those measures that are flagged as Red or
Amber are subject to improvement or corrective action. The performance review meetings
are used as a means for jointly agreeing these actions. 
6. CONCLUSIONS
The areas for improvement and corrective action identified as RAG Red and Amber are
attached as Appendix 1. The areas for improvement identified in Appendix 1 are being
progressed as a matter of priority, and progress updates will be reported at future meetings
of the Board and the Performance, Finance & Audit Committee.  
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
Yes  ☐ No ☐ N/A ☒

Page 3

3 
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
7.2 ASSOCIATED MEASURE(S)
None. 
7.3 FINANCIAL
This paper has been reviewed by Finance: 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register Details  Current Risk
Level 
Risk Owner 
IJB 11.21 - Oversight of
Performance Activity
Low Claire Rae
NLC RIA0000460 –
Performance & planning
High NLC – Social  Work/Social care 
7.5  ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken.
Objectives  Further Details 
☐ Involve stakeholders in the development
work aimed at achieving the national 
outcomes 
☐ Provide stakeholders with information on
how to get involved 
Yes  ☐ No ☐ N/A ☒

Page 4

4 
☐ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☐ Provide regular feedback on how
stakeholder engagement and participation is 
shaping and influencing service
development and delivery 
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
The performance information, with
the corresponding improvement
and corrective actions will enable
stakeholder representatives to
participate in wider discussion
about performance.
☐ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff 
☒ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
The performance information, with
the corresponding improvement
and corrective actions supports
locality planning. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
EQIA added to website: 
8. BACKGROUND PAPERS
Yes  ☐ No ☐ N/A ☒
Yes /
Date
added 
☐ No ☐ N/A ☒

Page 5

5 
None. 
9. APPENDICES
Appendix One - Areas for Improvement – 01st April 2025 to 30th June 2025, Quarter
1 2025/26 
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Head of Planning, Performance and Quality Assurance 
Members seeking further information about any aspect of this report, please contact
the following;
Stephen Forrest – Performance Manager Stephen.Forrest@lanarkshire.scot.nhs.uk

Page 6

6 
1.  Alcohol Brief Interventions Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Alcohol Brief Interventions North  3047
*annualised 501 482   RED
Narrative & Corrective Action
The overall Lanarkshire position remains on trajectory to meet annual delivery expectations but performance in North continues to fall short of the targeted level. Four
hundred and eighty-two (482) ABI were delivered in Q1, reflecting the ongoing challenges with both activity levels and data capture. 
A significant difficulty is inconsistent recording across different systems and services. The lack of a single, reliable method of logging activity means that reported figures
are almost certainly an undercount. Internal discussions have highlighted the need to improve alignment of reporting processes. 
At the same time, there is recognition that the overall prevalence of hazardous or harmful drinking has declined at population level and that this is likely to manifest in
reduced opportunities to deliver ABIs. While this contextualises the downward trend, it does not negate the need for accurate, consistent data to demonstrate the
current level of delivery.
Work will therefore continue through Q2 to see how a more robust recording approach can be developed, linking with the national guidance for ABI. 
2.  Cervical Screening Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Cervical Screening 80% 69.6% 69.7%   RED
Narrative & Corrective Action
Performance remains well below target in all localities and not achieved nationally, which has been the position for several years. Barriers include limited appointment
availability, system recording discrepancies between SCCRS and GP systems, and persistent non-attendance. The Inequalities in Screening Steering Group continues to
lead improvement work, with targeted awareness events, training for staff, and expanded engagement in early years and community settings. 
Cervical screening uptake continues to fall short of the national target across all six North Lanarkshire localities. While Airdrie, Bellshill, and Coatbridge demonstrated
marginal improvements in Quarter 1, North and Wishaw maintained previous levels, and Motherwell experienced a slight decline. These figures reflect broader national
trends, as outlined in the recent Public Health Scotland annual update. 
Locality Uptake Rate Change from Previous Quarter
Airdrie 66.8% ↑ 0.3%
Bellshill 68.9% ↑ 0.1%

Page 7

7 
Coatbridge 67.8% ↑ 0.1%
Motherwell 69.6% ↓ 0.2%
North 73.2% ↔ No change
Wishaw 68.8% ↔ No change 
The Scottish Cervical Screening Programme Annual Update (published 29 July 2025) confirms a sustained national decline in screening coverage. Scotland-wide coverage
has dropped to 63.3% in 2023/24, down from 72% in 2016/17. Lanarkshire mirrors this trend, with coverage falling to 66.4% from 73% over the same period. 
Key concerns include:
 A 16% disparity in coverage between the most and least deprived SIMD areas in Lanarkshire.
 Low engagement among 25–29-year-olds, with uptake at 48.4% in Lanarkshire and 38.2% nationally.
 Milan data for 2024/25 indicates average uptake of 70% in North Lanarkshire and 72.7% in South Lanarkshire, though variation persists across localities.
These figures reinforce the need for sustained, system-wide efforts to improve uptake, particularly among younger and more deprived populations.
Locality-Level Improvement Activity 
A range of initiatives were delivered during Quarter 1 to support cervical screening engagement:
In Bellshill, Motherwell & Wishaw/Shotts, Health Improvement teams developed locality-specific action plans, delivered via LPGs. Key actions included: 
 Use of digital screens in public venues to promote screening programmes.
 Training for Health Visitors using culturally informed resources. 
 Treatment Room staff trained to deliver screening messages.
 Quarterly data shared with clinical and operational leads.
Airdrie locality delivered a coordinated programme of activity during Cervical Screening Awareness Week (19–24 June), which included:
 Dissemination of information via newsletters and social media.
 Inclusion of screening materials in “Condoms by Post” packs.
 Delivery of inequalities training to seven participants.
Bellshill locality delivered targeted engagement activity to support cervical screening awareness including: 
• Submission of the Culture Junction Project resource to Public Health for inclusion in the Scottish Government’s Cervical Cancer Elimination Plan. 
• Promotion of screening information during the NHSL staff Health and Wellbeing event at the Coddington site. 
Coatbridge locality implemented a series of communication and outreach initiatives to promote cervical screening: 
 Inclusion of cervical screening messaging in Health Improvement newsletters and delivery of community workshops.

Page 8

8 
 Engagement with CLD groups and Dunbeth Family Learning Centre to share resources and raise awareness.
 Support for Treatment Room staff to embed screening conversations into chronic disease clinics, resulting in engagement with nearly 40 patients since May.
Motherwell & Airdrie localities delivered a coordinated programme of culturally tailored engagement activity to support cervical screening awareness. Initiatives
included: 
 Launch of a suite of three educational videos at Bellshill Central Mosque during Cervical Screening Awareness Week (Thursday 26 June), attended by over 70
women.
 Development of the video resources in partnership with NHS Lanarkshire Public Health, Health Improvement teams, and diverse South Asian communities from
Airdrie and Motherwell.
 Inclusion of cancer screening information at the Motherwell Locality Wellbeing Event on 8 May, hosted at Forgewood Community Centre. The event brought
together residents from Motherwell and wider North Lanarkshire to promote positive engagement with health and social care services and was supported by the
Airdrie Health Improvement Senior.
Wishaw locality focused on embedding screening conversations into routine clinical practice: 
• Training of the Chronic Disease Management team to deliver cancer screening messages during patient consultations. 
• A total of 130 screening-related conversations were held this quarter, including 34 specifically focused on cervical screening.
Performance Reporting and System Integration
Clarification of cervical screening performance reporting continues to be a national discussion point, particularly regarding discrepancies between multiple data recording
systems. This issue was raised with Consultant in Public Health for Cancer Screening, who supported the proposal for a single percentage achievement rate that excludes
all but defaulters. It was agreed that this recommendation should be escalated nationally to determine whether an existing report could meet this need or if a bespoke
report could be developed. Feedback from the SCCRS Senior Programme Manager and National SCCRS Lead confirmed that while the issue has been recognised for
several years, system changes are costly and constrained by existing contractual arrangements. The SCCRS system contract is due for review in 2027, at which point this
recommendation may be considered. In the interim, Lanarkshire Public Health continues to support practices with lower uptake rates by promoting effective use of
defaulter lists. A practical guide has been developed and shared to assist other practices in implementing this approach. 
HPV Immunisation Programme – Protective Impact
Scotland’s national HPV Immunisation Programme, introduced in 2008 and offered to all 12- and 13-year-olds, continues to demonstrate strong protective benefits. A
recent study has shown that no cases of cervical cancer have been detected among fully vaccinated women, reinforcing the long-term value of early immunisation. 
3.  Childhood Immunisations Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
RAG Status

Page 9

9 
Quarter Previous
Year
Immunisations – %s of 5 year olds   95% 88.7% 89.6%   RED
Immunisations – %s of 2 year olds 95% 94.8% 94.8%   AMBER
Narrative & Corrective Action
Uptake of childhood immunisations in North Lanarkshire has historically compared well to the national position, however both immunisation rates are below the
performance standard, reflecting a wider downward trend across Scotland. 
The Q1 results reflect the gradual but sustained fall in uptake. Whilst the result for the 2-year old immunisations metric is below target, there is evidence of sustained
performance at the targeted level in the recent past. This position is concerning given the importance of maintaining high coverage to protect population health and
ensure herd immunity. The decline is attributable to a combination of factors, including persistent vaccine hesitancy among a small minority of families, access issues
linked to missed appointments, and the lasting impact of pandemic-related disruption on routine contact with services. 
Community vaccination teams continue to work intensively to address the shortfall. Improvement actions include strengthening reminder and recall systems, improving
coordination with health visiting teams to promote vaccination at every opportunity, and targeted outreach to families who have not attended. Tailored communication
for communities where uptake is lower, with additional support offered to address barriers should also help to improve the position. 
Sustained effort will be required to reverse the downward trajectory and safeguard the progress made over previous years.
To combat the declining trend, NHS Lanarkshire has undertaken the following actions:
 Streamlined Process: The North East Sector pilot to streamline appointment times and improve cross-cover arrangements.
 Targeted Clinics: Additional vaccination clinics, including home visits to address accessibility issues.
 Enhanced Engagement: Health visitors actively discuss vaccinations during pathway visits and use targeted scripts to support consistent messaging.
 Data Analysis and Oversight: The newly established Area Oversight Vaccination and Immunisation Committee (AOVIC) is conducting comprehensive data reviews
and identifying systemic changes required to maintain uptake above 95%.
These efforts reflect a continued focus on improving immunisation uptake, reducing inequalities, and preventing outbreaks to safeguard the health of Lanarkshire’s
population. 
4.  6 – 8 Week Reviews Target 2025/26 2024/25 Q2 2024/25 Q3 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status 
Percentage of people who have completed 6-8 week
review 90% 83.4% 85.4%  ... RED

Page 10

10 
Narrative & Corrective Action
Please note that the data for this metric is presented in arrears, two quarters behind. 
Performance for 6-8 week child health faces continued challenges in meeting the target of 90%. Whilst there appears to be some stability in the level of performance, it is
significantly below the consistently high levels achieved pre-pandemic. 
The main pressures continue to be capacity within health visiting services, alongside the complexity of engaging families who face socio-economic barriers. Some missed
reviews also relate to parental choice or difficulties in arranging attendance within the required timeframe. 
In response, services have focused on strengthening recall and follow-up processes, with local teams undertaking more proactive contact with families to encourage
engagement. Targeted support in areas of lower uptake, in the form of community-based interventions designed to make access easier and reduce non-attendance, is
ongoing. Recruitment and retention of health visitors also remain a priority, with efforts continuing to stabilise the workforce and support delivery capacity. 
Improvement work will continue during Q2, with an expectation that a combination of enhanced recall systems, workforce stabilisation, and stronger community
engagement will lead to some incremental gains. However, the service acknowledges that sustained effort will be required to restore performance to the standards
targeted. 
Action Timescale Expected Impact on Indicator
Implement notification process
for missing forms TBC Reduce incomplete records
Test and evaluate Elsie App TBC Reduce DNAs, improve
attendance recording
Maintain GP practice engagement
programme Ongoing Increase form return rates
Embed SOP across all localities TBC Standardise processes, reduce
variation
Complete UHVP digital recording
scoping TBC Improve timeliness and accuracy
of reporting 
5.  Assistive Technology  Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status

Page 11

11 
Assistive Technology - Number Of People With
Technology (0-17 yrs)
1452
33 22   RED
Assistive Technology - Number Of People With
Technology (18-64yrs) 622 270   RED
Assistive Technology - Number Of People With
Technology (65+) 912 673   RED
Narrative & Corrective Action
This indicator is currently RAG-rated red. However, the significant decrease in the reported number of individuals with Assistive Technology does not reflect an actual
reduction in provision. Instead, it is due to a substantial change in how the data is recorded. 
Previously, the figure of approximately 1,500 recipients was derived using a methodology developed several years ago. With the transition to using ELMS2 and Mosaic,
this legacy method is no longer appropriate, as it does not align with current data recording practices. 
While ELMS2 is now the primary data source, it must be linked with data held in Mosaic for reporting purposes. Additionally, historical data remains in legacy systems
such as SWIS and MICES. Our initial analysis revealed that not all recipients of Assistive Technology are captured in the ELMS2 data, and several cases have been
identified where individuals receiving Assistive Technology are missing from ELMS2. It is unclear whether this is due to issues with data migration, and further work is
underway to assess the scale of the problem. 
We have also identified that individuals receiving Assistive Technology through Self-Directed Support (SDS) budgets are unlikely to be recorded in ELMS2, despite
receiving equipment. 
For internal reporting, the legacy methodology consistently identified around 1,500 recipients. A new method has now been developed to interpret ELMS2 data, resulting
in a revised figure of approximately 970. This new approach excludes deceased individuals and care home residents; groups that could not be reliably excluded using the
legacy data. However, this introduces challenges in terms of comparability and accuracy, as we know that some recipients are still not captured in the data. 
To improve the reliability and completeness of reporting, several actions are required. A priority action is to ensure that IEAS records include either the SWIS/Mosaic
number or CHI as a mandatory data field. External reporting requires the ability to index and match individuals across multiple services, which depends on a unique
identifier. Currently, ELMS2 does not mandate inclusion of SWIS/Mosaic or CHI numbers, and addressing this gap is essential.
Further work is also needed to understand how Assistive Technology provided through SDS is recorded internally, and to clarify what should be included or excluded in
future reporting. 
6.  Reablement and Rehabilitation  Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
RAG Status

Page 12

12 
Quarter Previous
Year
Reablement - Number Of People Completing Reablement
Process
2000 (500 per
quarter)  1788 317  ... RED
Reablement - % Of New or Increased Home Support
Packages Which Are Reablement 70% 63.0% 62.4%   RED
Reablement - % Of People With No or Reduced Home
Support Service Required At End Of Process 70% 62.5% 65.3%   RED
IEAS - % Deliveries Achieved Within 7 Working Days
Quarterly 80% 73.4%     RED
Narrative & Corrective Action
The indicators for Reablement presented in the CE Scorecard have not met the targeted levels of performance. During 2023/24, the number of people completing the
Reablement process increased, however in 2024/25 there has been a reversal of this trend. The percentage of new or increased Home Support packages that are
Reablement is relatively stable in a range, around but below, the targeted level of 70%. However, the percentage of people with no, or reduced Home Support at the end
of the Reablement process has failed to meet the targeted level of performance for some time.
Home Support Redesign
The Home Support Redesign Programme is focussed on Home Support that achieves individual outcomes for people using the service and their families. The redesign is
based on core principles that are aligned with B2B, SDS and developments in Hospital Flow. It is supported by several products that have been produced to progress the
work, including service specifications, a workforce profile and an analysis of demand/capacity data. The proposal is for a “Living Well” service that provides Home Support
to achieve individual outcomes for the people using the service and a distinct “Assessment & Planning” service, to include Rehabilitation and Reablement services,
ensuring that people receive a holistic assessment of their need and are provided with the most appropriate services to meet the individual outcomes. 
IEAS - % Deliveries Achieved Within 7 Working Days Quarterly
Performance improved in Q4, rising to 73.4% from 60.1% in Q3. While this marks a positive trend, it remains below the 80% target. The improvement reflects ongoing
efforts to embed service transformation and fully implement the new priority-based delivery framework.
Since December 2024, the service has operated under a four-level prioritisation model, which has shifted focus toward higher-priority deliveries (P1 and P2).
Consequently, P3 orders have significantly reduced, and backlogs in lower-priority categories are now being addressed in a more structured and consistent manner. The
service continues to engage with teams to support appropriate ordering and effective signposting. Service capacity remains under pressure due to vacancies, absence and
holiday cover, impacting on the ability to process new orders.
Despite these operational challenges, the service continues to advance its transformational agenda. ELMS2 is now live and in use, however there are ongoing refinements
in process aimed at improving reporting capabilities and system integration. The availability of ELMS2 data supports the development of new KPIs that align with the
priority model. However, as noted in the earlier commentary on Assistive Technology, significant work is still required to ensure that data recording processes
enable linked reporting across systems, particularly the recording of a Mosaic ID, or CHI as a unique reference for index/match of data across systems.

Page 13

13 
7.  Adult Mental Health Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
18 Week RTT Performance – Psychology (NHSL) (NORTH
HOSTED) 90% 75.0% 75.6%   RED
Consultant Outpatient WT - Adult Mental Health - 12wks
(NHSL) (NORTH HOSTED) 90% 21.8% 20.8%   RED
Consultant Outpatient WT - Older Adult Psychiatry -
12wks (NHSL) (NORTH HOSTED)  90% 66.2% 71.5%   RED
Narrative & Corrective Action 
18 Week RTT Performance – Psychology (NHSL) (NORTH HOSTED)

Page 14

14 
The current performance is consistent with the DCAQ modelling produced by the PHS Analyst; the current modelling suggests that the RTT position will be within a range
of between 70% and 80%, based on the overall position for the service. 
The RTT performance reflects the refreshed criteria, with self-referral digital interventions now excluded from the calculation. Were digital therapies to be included, an
approximate 10% increase in performance would be realised. 
The total number of patients waiting over 18 weeks has decreased significantly over the last 12 months (there has been a 22% reduction in the total waiting list and
37.2% reduction in over 18 week waits). The total queue is less that the anticipated trajectory, indicating sustained progress in reducing the waiting. 
Referrals for Neuropsychology continue to increase; our modelling indicates that if current trends continue, the volume of referrals will result in the waiting list reaching
175.1% of its current size by November 2026. To meet the RTT (Referral to Treatment Time) target under these conditions, an additional 4.25 WTE (Whole Time
Equivalent) clinician capacity would be required. An SBAR detailing potential options and the management of risk in this area is in escalation through the appropriate
governance structures. 
Consultant Outpatient WT - Older Adult Psychiatry - 12wks (NHSL) (NORTH HOSTED) 
Since August 2023, the service has been operating with limited Consultant capacity in Older Adult Psychiatry. This is due to maternity leave and vacancies across the
team. Recruitment to Specialty Doctor posts is a significant challenge, despite persistent effort to fill these roles. Whilst vacancies remain, existing staff continue to
providing best cover for rota sessions to maintain service continuity.

Page 15

15 
To reflect the reduced availability of Community Consultants for routine outpatient work, the service made a series of internal rota adjustments. These changes have
contributed to longer patient waiting times, as Consultants have necessarily had to scale back community clinical activity to support rota coverage for vacant posts. 
Increased demand; driven by changing community demographics, impacts on the service’s ability to meet targets. However, as staffing capacity improves, waiting times
should improve in-line with the increased capacity. 
To help manage current pressures, local teams are running closely monitored ad-hoc clinics to ensure the best possible balance between demand and available capacity. 
Consultant Outpatient WT - Adult Mental Health - 12wks (NHSL) (NORTH HOSTED) 
Staff recruitment, retention, and development continue to present the most significant challenges for the Adult Mental Health service, particularly within General Adult
Psychiatry (GAP). The ongoing imbalance between demand and capacity, alongside staffing instability, severely affects the service’s ability to meet waiting time targets. 
As noted in previous reporting, a review of the Clinical Director model highlighted that General Adult Psychiatry (GAP) has been operating with an approximate 50%
vacancy rate, demonstrating the scale of the challenge. 
The Programme Board for Mental Health, Learning Disabilities & Addictions (MHLD&A) services is actively working on addressing medical staffing shortages while
simultaneously considering changes to traditional psychiatry working practices. This includes exploring new models of practice such as the introduction of Advanced

Page 16

16 
Nurse Practitioner (ANP) roles within the community to support Community Mental Health Teams (CMHTs) and reduce reliance on medical staff. While the primary focus
remains on tackling staffing gaps, these innovative approaches could also help attract new talent to the service. 
Several initiatives are underway to address these staffing challenges, including:
 Ongoing recruitment efforts in partnership with HR and wider advertising for vacant posts.
 Collaborations with the Centre for Workforce Supply in Scotland, recruitment agencies, and exploration of pathways for International Medical Graduates (IMGs),
alongside novel marketing strategies.
 Discussions with Medical Education regarding additional higher trainee placements.
 Increased use of Extra Planned Activities to enable current staff to cover service gaps. 
However, given the current workforce situation, most of these initiatives are expected to produce medium to long-term improvements rather than immediate results.
These actions are crucial for ensuring the future stability of the service. 
The service has written an Options Appraisal (OA) to guide the future direction of General Adult Psychiatry Services. The OA paper offers various solutions that can be
adapted based on integrated, cross-disciplinary tests of change and outlines six key recommendations to drive service transformation:
 Formation of a Programme Board to review the GAP service model and develop a sustainable, cross-discipline workforce aligned with the Scottish Government’s
Adult Secondary Mental Health Services Quality Standards.
 Maximisation of recruitment and retention efforts by supporting the current workforce and absorbing high-cost locums into permanent NHS roles.
 A comprehensive workforce review across all disciplines within GAP services, including expansion of the ANP pilot into CMHTs and a review of Psychological
Therapy Teams.
 Engaging with referrers, patients, and carers to ensure appropriate access to services.
 Creation of clear guidance for transitions between primary and secondary care GAP services, and between different sub-specialities within Mental Health &
Learning Disability Services.
 Reliable statistical modelling to support longer-term workforce planning to ensure services meet population demand. 
In parallel, the General Manager is working closely with the Clinical Directors on a focused piece of work to assess Demand, Capacity, Activity, and Queue (DCAQ) within
GAP and Older Adults Psychiatry. 
The preferred model for GAP services in North Lanarkshire involves a functional split between inpatient and outpatient care, with dedicated consultants for each ward.
This model, which is favoured by stakeholders and aligns with broader trends in Scotland, aims to provide psychiatrists with protected time to focus on either inpatient or
CMHT responsibilities, improving consistency, responsiveness, and stability within these services. It also simplifies job planning and reduces the need for the Duty AMP

Page 17

17 
role, improving service efficiency. As the OA is still under review, these recommendations may evolve, however the service will communicate the development of this
widely with stakeholders as the work progresses. 
8.  Medical Paediatrics Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Medical Paediatrics WT - 12 wks (NHSL) (NORTH
HOSTED) 90%* 80.3% 76.0%   RED
Narrative & Corrective Action
The SCHSU Service Manager represents the unit at the Acute Weekly Planned Care Group that has a focus on longest waits (more than 52 weeks). A Plan on a Page
Report is updated weekly to reflect progress to date. Going forward, this will be shared with Chief Officer.  This is complemented by the SCHSU’s newly established
Paediatric Service Improvement Group that reports into the Unit Performance Meeting. This group has representation from medical, professional nursing leadership and
admin colleagues. It will be responsible for the delivering improvements in performance. 
The service improvement group has identified several areas of focus that should collectively expedite process. These include: 
 Clearance of backlogs –Support to discharge for identified groups (melatonin, 16).
 Release capacity for T21 annual reviews, neonatal transfers.
 Review ratios of new: return patients including a review of Registrar Clinic (increase of new apt capacity with supervisory oversight from Consultant) Review of
Registrar clinic.
 Review of Child not Brought Policy – Offer Tel Triage post first non-attendance. Only rebook if family engages and/or there is another identified vulnerability.
 Clarity and consistency in vetting process.
To support this: 
 Booking to be centralised to SCHSU Waiting List Team- additional scheduler will be required for delivery of ToC.
 Good housekeeping/reporting via WL Team/Weekly planned care meeting and Unit Performance Management meeting.
 Trakcare build – WLI.
 Trajectories for Community Paeds in progress of being built to evidence delivery of new process model.
 Validation process planned for September 2025.
Professional Support required to:

Page 18

18 
 Identify scope and span of new roles that will support wider changes to model (in particular for continence and sleep referrals).
 Consultants reviewing current capacity against job plan.
 Review of apt times and length for new and return patients. 
9.  SLT Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
SLT - Paediatrics - 12wks (NORTH HOSTED) 90%* 17.6% 42.7%   RED
SLT - Adult - 12wks (NORTH HOSTED)  90%* 79.2% 82.8%   RED
Narrative & Corrective Action 
SLT - Adult - 12wks (NORTH HOSTED)
Performance for Q4 again improved from the previous quarter (rising to 82.8%) but remains below the 90% target. As previously reported, the end of post-COVID
recovery funding continues to have an impact. Although no posts were lost, due to recruitment challenges overall staffing levels in the Adult Acquired service remain
reduced compared to the previous year. 
The service continues to experience long-term sickness absence, further constraining capacity. Referral demand remains elevated, with high levels of referral demand
sustained for several quarters. Recruitment efforts are progressing, with a focus on restoring lost capacity. Opportunities for longer-term system improvement, such as
the administrative skills matrix and digital system alignment (notably Trakcare), are progressing in line with broader SLT transformation work. 
SLT - Paediatrics - 12wks (NORTH HOSTED)
Although the performance remains significantly below the 90% target, in Q1 of 2025/25 there was a significant improvement, with compliance with the twelve-week
standard increasing from 17.6% to 42.7%. The long-standing performance challenges reflect ongoing capacity constraints and structural workforce issues. As a result, the
service will deliver a modernisation programme to deliver sustainable change.
The well-established SLT CYP Service Improvement Programme has multiple work streams in place to address equity, efficiency, and quality of care:
 Digital – developing e-referral processes, improved clinical documentation, and text-based communication with families to reduce DNAs and improve access.
 Waiting List – reviewing and amalgamating lists, standardising pathways, and ensuring that children and young people (CYP) receive universal input while waiting
for targeted or specialist input.

Page 19

19 
 Workforce & HR – aligning job plans and skill mix, supporting a confident, skilled workforce through structured learning plans.
 Administration – this work stream has completed a skills matrix and implemented targeted training, with Admin now integrated into the other improvement
groups.
 Communication – supporting the production of a Communication and Engagement Strategy and Equalities Impact Assessment to underpin change.
These efforts are designed to release clinical capacity, strengthen data quality, and ensure a consistent, evidence-based approach to care delivery. Importantly, the
revised model reflects a broader ambition to reconfigure teams across North and South Lanarkshire, reduce variation, and improve the responsiveness of the service.
Recruitment and retention remain critical to delivery, however activity continues to impact positively on vacancy management and contributes to the improvements in
performance for this quarter. The service is also preparing trajectory-based forecasts for each tier of intervention to support planning and demonstrate progress toward
the 90% target. 
10.  Dietetics Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Dietetics - 12wks (NORTH HOSTED) 90%* 62.5% 69.8%   RED
Narrative & Corrective Action 
A structured improvement programme is now underway to enhance service delivery and waiting list management. This includes a recent waiting list validation exercise,
followed by the implementation of a rolling three-monthly validation process to ensure ongoing accuracy and a more effective oversight of the waits. 
The service is actively addressing data inaccuracies within TrakCare, and previously discontinued waiting list coordination practices have been reinstated. Standard
Operating Procedures (SOPs) are currently in development, with staff training planned to support the implementation of these changes. 
To increase capacity, a Waiting List Initiative has been introduced, providing an additional 12 adult clinic appointments and 8 domiciliary telephone consultations per
week. This is complemented by an expanded paediatric provision. 
In parallel, the service is progressing a broader transformation agenda, which includes:
 Modernising systems and processes
 Streamlining referral pathways
 Embedding new ways of working to support sustainable service delivery

Page 20

20 
An interim target of seeing 70% of patients within 12 weeks was set for June 2025 and was almost achieved (69.8%). However, workforce resilience remains a key risk,
with the service’s highly specialised configuration vulnerable to staff turnover.
To support long-term sustainability, work is ongoing to explore the potential of a more generalist model of dietetic provision, which may offer greater flexibility and
resilience across the service. 
11.  Complaints Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Complaints Processed 20 Working Days (NHSL) 50% 38% 34%   RED
Narrative & Corrective Action 
As previously reported, the performance targets for processing complaints have been revised for both Stage 1 and Stage 2 complaints. While the response timescales
remain unchanged, the compliance targets have been adjusted. Specifically, the new target for Stage 2 complaints is for 50% of them to be responded to within 20
working days. 
As performance is measured as a percentage compliance metric, it can be significantly impacted by a small number of complex or non-compliant cases. For NHS
Lanarkshire overall, performance has improved but remains below the 50% target. The majority of delays are attributed to system-related issues, with the late receipt of
statements being the most significant contributing factor. 
To support improvement, additional permanent resource has been added to the NHSL Patient Affairs team as of June 2025, which is expected to enhance response times
in future quarters. 
Within the partnership, the Senior Management Team continues to promote early resolution of complaints at Stage 1. Stage 2 delays are actively monitored, with
escalation triggered where necessary. 
As a balancing measure, University Health and Social Care North Lanarkshire published 46 patient stories in May 2025, of which 38 (83%) reflected a positive experience. 
12.  Smoking Cessation Target 2025/26 2024/25 Q2 2024/25 Q3 Performance
Compared to
Previous Quarter
Performance
Compared to Same
RAG Status

Page 21

21 
Quarter Previous
Year
Sustain and embed successful smoking quits, at 12-
weeks post quit, in 40% of SIMD areas. (AOP) (NORTH
HOSTED)
902 110 166 ... ... RED
Narrative & Corrective Action
Please note that the data for this metric is presented in arrears, two quarters behind. 
All - North locality data April to December 2024/25 Q1-3 (40% most deprived) 
Locality
Number
of Quit
Date Set
(QDS) 
Number
of 12
week
quits
9 month
target +/-
RAG on
Target
% 12
week quit
success
% Lanarkshire
rate
Airdrie 118 16 68.3 -52.3 23% 14% 22%
Coatbridge 120 40 56.3 -16.3 71% 33% 22%
North 102 24 60.8 -36.8 40% 24% 22%
Bellshill 146 20 68.3 -48.3 29% 14% 22%
Motherwell 132 18 47.3 -29.3 38% 14% 22%
Wishaw 132 22 61.5 -39.5 36% 17% 22% 
Please note: Table 1 includes both specialist and community pharmacy services 
The table above shows the number of successful 12 week quits against the target for North localities. A six-month time lag is present, per the reporting schedule.
Based on the most recent data, NHS Lanarkshire as a whole is projected to achieve 49% of its Local Delivery Plan (LDP) target set by Scottish Government (438 of 902
successful 12 week quits). 
Specialist - North locality data April to December 2024/25 Q1-3 (40% most deprived)
Locality
Number
of Quit
Date Set
(QDS) 
Number
of 12
week
quits
9 month
target +/-
RAG on
Target
% 12
week quit
success
% Lanarkshire
rate
Airdrie 20 9 21 -12.0 43% 45% 53%

Page 22

22 
Coatbridge 28 17 21 -4.0 81% 61% 53%
North 14 8 17.3 -9.3 46% 57% 53%
Bellshill 16 6 14.3 -8.3 42% 38% 53%
Motherwell 21 11 18.8 -7.8 59% 52% 53%
Wishaw 22 13 18.8 -5.8 69% 59% 53% 
Please note: Table 2 includes community, pregnancy and mental health only 
The Specialist table above shows the number of successful 12 week quits against the target for the QYW Specialist service only. Again, a six-month time lag is present, per
the reporting schedule. 
Table 3: Pharmacy - North locality data April to December 2024/25 Q1-3 (40% most deprived)
Locality
Number
of Quit
Date Set
(QDS) 
Number
of 12
week
quits
9 month
target +/-
RAG on
Target
% 12
week quit
success
% Lanarkshire
rate
Airdrie 98 7 47.3 -40.3 15% 7% 15%
Coatbridge 118 3 47.3 -44.3 6% 3% 15%
North 106 32 39.0 -7.0 82% 30% 15%
Bellshill 116 12 33.0 -21.0 36% 10% 15%
Motherwell 81 13 42.0 -29.0 31% 16% 15%
Wishaw 110 9 42.8 -33.8 21% 8% 15% 
Key Issues for Q1 2025/2026
QYW Stop Smoking Service 
In Q1, significant reduction in staff capacity due to high levels of both short and long-term sickness absence continued, which has affected the completion of the
mentoring programme intended to increase service delivery capacity. The number of referrals into the Specialist Community QYW service remains low and of those
referred, the number of those that then go onto set a quit date, is also low. North Lanarkshire localities have seen a 12.9% drop in referrals (excluding self-referrals) for
Q1, Q1 2024/25 (139) vs Q1 2025/26 (121). 
QYW Community Pharmacy Service

Page 23

23 
The main issues identified from visits by the pharmacy support team to community pharmacists during Q1 concern Patient Care Record (PCR) entries and logins, staff
training and Nicotine Replacement Therapy product (NRT) queries. There are discrepancies in the completeness and accuracy of data entered into the PCR system and
these gaps may be affecting the accuracy of performance reporting submitted to the Scottish Government.     
In 2024/25 (Q1-3), for all pharmacies residing in North localities, there were 1047 QDS (All SIMD):
 Four-hundred and ninety-four - (494) clients (63%) had no smoking status recorded at their 4-week follow-up (i.e., a blank follow-up).
 Seventy - (70) clients (23%) who had a successful quit at their 4-week follow-up had no smoking status recorded at their 12-week follow-up (i.e., blank follow-
up). 
Key Actions for Q2 2025/26
QYW Stop Smoking Service-
 The Lanarkshire’s Tobacco and Vaping Programme Plan (2024–2026), starting on 1st April 2025, is supported by detailed Tobacco and Vaping Action Plans. The
priority areas including: Pregnancy, Secondary Care, Mental Health and communities within the 40% most deprived areas. The Tobacco and Vaping Steering
Group have reviewed the content of the plans. 
 The redesigned Quit Your Way (QYW) went live on 1st April 2025. 
 The services has approval to recruit two full-time, fixed-term Health Improvement Practitioner posts for a duration of 23 months. These posts will focus on
supporting inpatients and individuals living in the 40% most deprived areas of Lanarkshire. 
 Health Improvement staff continue to maintain a visible presence across the three secondary care sites. This has contributed to an increase in the conversion
rate from referrals, to patients setting a quit date while in hospital, compared to quarter one of the previous year. 
 Uptake of the Smoke-free app by staff remains low. However, promotional efforts are ongoing and the opportunity to engage with the app remains available. 
 A productive meeting with Health and Social Care Partnership (HSCP) colleagues took place on 17th April 2025 to explore ways to increase referrals to the QYW
service from Allied Health Professionals in North Lanarkshire. As a result, further meetings with Integrated Rehab Teams and Service Manager Team Meetings in
Wishaw and Coatbridge will take place. These meetings aim to raise awareness of the QYW service, clarify referral pathways and identify training needs. 
QYW Community Pharmacy Service

Page 24

24 
 QYW Pharmacy Support Team will continue to carry out visits to community pharmacies across Lanarkshire to improve data recording and service performance
across the QYW Community Pharmacy Service.   The service prioritises visits to Community pharmacies where our data analysis has highlighted poor
performance.   
 Following a successful commissioning process, JRS, a research consortium comprising Jump Research, RedTree Research, and the Social Marketing Gateway,
secured funding to lead a research project that includes a desktop review and the development of research tools. The project will launch in partnership with
community pharmacies in August 2025. 
 A briefing document is being finalised to serve as an internal briefing to direct consultation with clients who have used the QYW Pharmacy service in order to
understand when, why and how clients use pharmacies to quit, and their expectations and experiences of the service. 
Discussions will continue to take place with the Community Pharmacy Lead in relation to a shared care agreement between Community Pharmacy and NHS Lanarkshire
QYW specialist services. 
13.  Sickness Absence Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Sickness Absence (NHSL, North)  4% 7.45% 7.09%   RED
Narrative & Corrective Action
Despite ongoing efforts, sickness absence remains an issue and the wider NHSL Board remains above the national average for this metric. 
Sickness absence remains above the 4% standard, consistent with wider national pressures across the health system. The main drivers continue to be musculoskeletal
conditions and stress-related absence, both of which likely reflect the sustained operational pressures faced by frontline services. 
Improvement activity during Q1 centred on supporting early interventions and return-to-work processes. Managers are encouraged to use occupational health services
proactively and ensure early referral where appropriate. Targeted wellbeing initiatives also remain in place, with ongoing promotion of resources such as the Staff
Wellbeing Hub and psychological support services.
While improvement will be gradual, the Partnership will continue to prioritise sickness absence reduction through enhanced management action, robust monitoring, and
targeted interventions.

Page 25

25 
14.  Addictions Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Addictions – Ongoing Waits NHSL 90% 94.4% 89.7%  … AMBER
Narrative & Corrective Action
In May 2021, the Drug Deaths Taskforce introduced ten standards of care for Medication Assisted Treatment (MAT), forming the foundation for Scotland’s National
Mission on Drugs (2022) and the National Strategy for Community Justice (2022). A national benchmarking report published by Public Health Scotland tracks progress
across all 29 Alcohol and Drug Partnership (ADP) areas as of April 2025.A DPs submitted evidence across process, numerical, and experiential domains, which informed a
composite RAGB (Red, Amber, Green, Blue) rating. The 2024/25 report shows continued national improvement:
 91% of ADPs fully implemented MAT standards 1–5 (up from 17% in 2021/22)
 75% achieved full implementation of standards 6–10, with 16% nearing completion.
This reflects a strong national commitment to innovation, collaboration, and continuous improvement. 
RAGB Colour |
Definition 
Colour Definition
Red There is no or limited evidence of implementation of the
standard in MAT services
Provisional amber There is no or limited evidence of implementation of the
standard in MAT services
Amber There is evidence of partial implementation of the standard
in MAT services including benefit to people
Provisional green There is evidence of implementation and benefit to people,
however, full implementation is not confirmed by all three
evidence streams – usually the experiential stream is lacking
Green There is evidence of full implementation and benefit to
people in all unique combinations of setting and service that
offer MAT and opioid substitution therapy (OST) across the
ADP area

Page 26

26 
ADP Reporting
Year
MAT 1 MAT 2 MAT 3 MAT 4 MAT 5 MAT 6 MAT 6
& 10
MAT 7 MAT 8 MAT 9 MAT 10
North
Lanarkshire
2022           
2023           
2024           
2025           
North Lanarkshire has made significant strides in delivering effective Medication Assisted Treatment (MAT). The Urgent Response Team has enabled rapid access to care,
with 81% of referrals assessed and prescribed within 24 hours, surpassing national benchmarks. Treatment options have diversified, with a notable reduction in
methadone and oral Buprenorphine prescribing, and a 27% increase in long-acting injectable Buprenorphine, reflecting a more patient-centred approach. Assertive
outreach, led by Turning Point Scotland, has been particularly impactful, with 341 crisis interventions - the highest in Scotland, meeting national standards. Harm
reduction efforts have also expanded, with over 4,000 interventions recorded using a bespoke tool that allows for locality-specific service tailoring. 
Retention in care is another area of strength, with 94% of Alcohol Response Team (ART) service users remaining engaged for over six months, supported by the NEO
system for pharmacy monitoring. Psychological and trauma-informed care is well embedded, with clear implementation plans and comprehensive training across
commissioned services and ART teams that exceed national expectations. Advocacy and social support have been enhanced through increased team awareness and
expanded service capacity, contributing to a more holistic support system. 
However, challenges remain. Integration with primary care is limited, as no OST prescriptions have been issued through general practice, unchanged from the previous
year, restricting access to MAT via general health services. Mental health support is available only to a small cohort, and joint care pathways are still under development
by a Pan-Lanarkshire steering group. The sharp rise in long-acting Buprenorphine prescribing, while beneficial, may place strain on resources and requires strategic
planning to ensure sustainability. Additionally, the absence of a formal system to record when advocacy is offered limits visibility into service uptake and impact,
highlighting the need for improved data capture mechanisms. 
The true impact of ongoing implementation will be demonstrated through measurable outcomes. Encouragingly, a reduction in drug-related deaths has already been
observed this year. These figures will be reflected next year as we always report a year behind. The data presented at 1.10 reflects a pan-Lanarkshire overview, which
indicates that regional services are currently falling short of meeting the prescribed waiting time targets. However, a more focused analysis of North Lanarkshire,
specifically the Alcohol Response Team (ART), reveals a markedly different picture. Drawing on performance data from IM and DAISy (1.9), North Lanarkshire has
consistently exceeded the 90% compliance threshold for waiting times. This success is underpinned by a revised engagement strategy, which includes a clinic-based
service delivery model and the introduction of weekly audits to monitor adherence to the 21-day standard across all teams.

Page 27

27 
15.  Unscheduled Care Target 2025/26 2024/25 Q3 2024/25 Q4 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
A&E Attendances - NL Residents 116,456  30,541 28,896  … AMBER
Emergency Admissions - NL Residents  44,001  11,974
Quarterly/ 2
quarters
behind
 … AMBER
Narrative & Corrective Action
Please note that the data is presented in arrears; for A&E Attendances, one quarter behind and Emergency Admissions, two quarters behind. 
Both UHM and UHW continue to experience challenges that impact on length of stay, delays to admission and delays to first assessment. The issues include a high
number of patients not meeting the criteria to reside, a high volume of patients with a length of stay in excess of 14 days, a continued reduction in bank and agency fill
rates and unplanned staff sickness absence. 
Performance against the targets for the four, eight and twelve hour breaches remain below the local improvement trajectory and the national targets for these metrics. A
number of actions are either complete, or work in progress to improve the overall position for A&E and wider capacity and flow. 
Surge capacity is now in use at all three acute sites. Criteria to Reside Audits, Flow navigation, oversight and virtual ward pathways are in place to support a more
consistent delivery of the Target Operating Model. The significant reduction in homecare delays and general improvement in both discharge processes and flow have
contributed to an overall reduction in occupied bed days and number of patients over 14 days. 
16.  Training and Development Target 2025/26 2024/25 Q4 2025/26 Q1 Performance
Compared to
Previous Quarter
Performance
Compared to Same
Quarter Previous
Year
RAG Status
Employee Code of Conduct 80% 84.5% 78.4%   AMBER
Introduction to Risk Management 80% 82.2% 79.2%   AMBER
Prevent 80% 82.1% 79.8%   AMBER

Page 28

28 
Records and information management 80% 79.3% 75.8%   AMBER
Fire Safety Training 90% 90.0% 89.6%   AMBER
Hand Hygiene Training  90% 88.6% 87.5%   AMBER
TURAS compliance (NHSL, North) 80% 71% 79%   AMBER
Narrative & Corrective Action
Mandatory training and TURAS compliance remain a priority across the Partnership, with continued close monitoring at SMT level and monthly circulation of
management data to identify individuals requiring additional support. Improvement efforts remain focused on enhancing access to e-learning and in-person training
opportunities, with particular emphasis on LearnPro modules where uptake continues to lag. 
During Q1, local Performance and Quality Coordinators provided targeted team-level analysis to highlight areas of low compliance and support remedial action. Managers
continue to review compliance as part of routine performance discussions, with a focus on early escalation of risks and ensuring that new staff complete mandatory
modules promptly during their induction period. 
The emphasis for 2025/26 is on embedding a more proactive approach to appraisal planning, ensuring appraisals take place throughout the year to avoid a spike in
activity at year-end. Preparatory work has begun on developing standardised objectives tailored to role and level, to improve consistency across appraisals and
strengthen alignment to the service priorities. 
Next steps include further development of the management information system to improve accessibility of compliance data, alongside continued partnership with OD
and training colleagues to ensure adequate opportunities for staff to complete required learning.

Page 29

29 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed