Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 5 June 2025
Back to Community Services Committee — 5 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
29 May 2025 
NOTICE OF MEETING 
A meeting of the COMMUNITY SERVICES COMMITTEE will be held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on
THURSDAY, 5 JUNE 2025 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTE (Pages 3 - 10)  
Community Services Committee held on 6 March 2025 
4. POLICE SCOTLAND - ARGYLL & BUTE PERFORMANCE SUMMARY REPORT -
REPORTING PERIOD: APRIL 2024 - MARCH 2025 (Pages 11 - 22)  
Report by Divisional Commander for Argyll and Bute, West Dunbartonshire Division,
Police Scotland 
5. SCOTTISH FIRE AND RESCUE SERVICE - ARGYLL & BUTE PERFORMANCE
AND SCRUTINY GROUP 2024-25 Q4 SCRUTINY REPORT (Pages 23 - 38)  
Report by Local Senior Officer, Scottish Fire and Rescue Service 
6. ARGYLL & BUTE HSCP - PERFORMANCE REPORT FQ3 2024/25 (OCTOBER -
DECEMBER) (Pages 39 - 54)  
Report by Senior Manager Performance & Improvement, Argyll and Bute Health and
Social Care Partnership 
7. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - RELOCATION OF
TOBERMORY 2-18 CAMPUS (Pages 55 - 80)  
Report by Executive Director with responsibility for Education   
Public Document Pack

Page 2

REPORTS FOR NOTING 
8. EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT (Pages 81 -
92)  
Report by Executive Director with responsibility for Education 
9. COMMUNITY SERVICES COMMITTEE WORK PLAN 2025 - 2026 (Pages 93 - 94) 
Community Services Committee 
Councillor Gordon Blair Councillor Maurice Corry
Councillor Audrey Forrest (Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Anne Horn Councillor Fiona Howard
Councillor Jennifer Kean Councillor Paul Donald Kennedy
Councillor Dougie McFadzean (Vice-Chair)
Councillor Julie McKenzie Councillor Yvonne McNeilly
Councillor Iain Paterson Councillor Gemma Penfold
Councillor Dougie Philand Margaret Anderson
Lorna Stewart Daniel Semple
Reverend Dorothy Wallace   
Contact: Katie McKenzie, Committee Services Officer  Tel: 01546 604465

Page 3

MINUTES of MEETING of COMMUNITY SERVICES COMMITTEE held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 6 MARCH 2025 
Present: Councillor Audrey Forrest (Chair) 
Councillor Gordon Blair
Councillor Maurice Corry
Councillor Amanda Hampsey
Councillor Graham Hardie
Councillor Anne Horn
Councillor Fiona Howard 
Councillor Jennifer Kean
Councillor Dougie McFadzean
Councillor Yvonne McNeilly
Councillor Iain Shonny Paterson
Councillor Gemma Penfold
Daniel Semple 
Attending: Douglas Hendry, Executive Director
Jen Crocket, Head of Education: Wellbeing, Inclusion and Achievement
Wendy Brownlie, Head of Education: Performance and Improvement 
Rachel Binnie, Education Manager
Simone McAdam, Education Manager
Louise Chisholm, Virtual Head Teacher
Stuart McLean, Committee Manager 
Chief Superintendent Gary I’Anson, Police Scotland
Superintendent Ross Kelly, Police Scotland
Chief Inspector James McArthur, Police Scotland 
Chief Inspector Lee Page, Police Scotland
Inspector Bart Simonis, Police Scotland
Group Commander Brian Wardle, Scottish Fire and Rescue Service
Kate Coutts-McInness, Colgrain Primary School
Kieron Henderson, Colgrain Primary School
Katie Low, Colgrain Primary School
Holly, Young Person 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Daniel Hampsey, Paul Kennedy,
Julie McKenzie and Dougie Philand and Margaret Anderson, Dorothy Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTE 
The Minute of the Community Services Committee held on 12 December 2024 was
approved as a correct record 
Councillor Maurice Corry joined the meeting during consideration of the following item of
business. 
Page 3 Agenda Item 3

Page 4

4. SCOTTISH FIRE AND RESCUE SERVICE - ARGYLL & BUTE PERFORMANCE
REPORT Q3 - 1 OCTOBER 2024 - 31 DECEMBER 2024 
With the aid of power point slides, Group Commander Brian Wardle presented a report
highlighting Scottish Fire and Rescue Service’s review of local performance within Argyll
and Bute for Q3 (1 October 2024 – 31 December 2024) and responded to a number of
questions asked. 
Decision 
The Committee reviewed and noted the contents of the report. 
(Reference: Q3 2024/25 Report by Local Senior Officer, Scottish Fire and Rescue
Service, submitted) 
Councillor Amanda Hampsey joined the meeting during consideration of the following item
of business. 
5. POLICE SCOTLAND ARGYLL & BUTE PERFORMANCE SUMMARY REPORT -
REPORTING PERIOD: APRIL 2024 - DECEMBER 2024 
Chief Superintendent Gary I’Anson presented the Argyll and Bute Performance Summary
Report of Police Scotland’s Policing Priorities for 1 April 2024 – 31 December 2024 and
responded to questions asked. 
Decision 
The Committee reviewed and noted the content of the report. 
(Reference: Report for April 2024 – December 2024 by Divisional Commander for Argyll
and Bute, West Dumbarton Division, Police Scotland, submitted) 
6. HEALTH AND SOCIAL CARE PARTNERSHIP - PERFORMANCE REPORT -
FQ2 2024/25 (JULY - SEPTEMBER) 
The Committee gave consideration to a report detailing performance for FQ2 (July –
September) 2024/25 for Argyll & Bute Health & Social Care Partnership. 
Decision 
The Committee agreed to: 
1. acknowledge performance for FQ2 2024/25 (July - September); 
2. acknowledge performance update on the National Health & Wellbeing Outcomes and
Ministerial Steering Group Integration Indicators; and 
3. note Delayed Discharge Sitrep as of 30 September 2024. 
(Reference: Report by Senior Manager, Performance and Improvement, Argyll and Bute
HSCP dated 6 March 2025, submitted) 
Page 4

Page 5

7. EDUCATION VISION AND STRATEGY - OUR CHILDREN, THEIR FUTURE -
THRIVING TOGETHER 
The Committee gave consideration to a report presenting the refreshed Education vision
and strategy document Our Children, Their Future – Thriving Together, along with a
presentation from pupils of Colgrain Primary School. 
Decision 
The Community Services Committee considered and approved the refreshed Education
Service vision and strategy: Our Children, Their Future – Thriving Together as informed by
consultation and engagement with staff, parents/carers, pupils and wider partners. 
(Reference: Report by Executive Director with responsibility for Education dated 24
February 2025, submitted) 
8. CARE EXPERIENCED CHILDREN AND YOUNG PEOPLE 
The Committee gave consideration to a report providing an update on actions being taken
within the Education Service to support Care Experienced Children and Young People to
achieve the best possible educational outcomes and a presentation from a young person. 
The report also detailed the expenditure against the grant allocated by Scottish
Government to Argyll and Bute for session 2023/24 from the Scottish Attainment
Challenge Care Experienced Children and Young People Fund. 
Decision 
The Community Services Committee – 
1. endorsed the work undertaken by Argyll and Bute Education Services as part of the
Corporate Parenting Board to improve the educational attainment and life chances of
Care Experienced Children and Young People; 
2. noted that the spending plan for the grant allocated by Scottish Government to Argyll
and Bute for session 2023/24 from the Scottish Attainment Challenge Care
Experienced Children and Young People Fund had been produced and monitored by
the Education Lead for Care Experienced Children and Young People, in consultation
with key partners and specifically the Social Work Lead for Care Experience, the Chief
Education Officer and Chief Social Worker; 
3. agreed the attainment funding for Care Experienced Children and Young People would
support the continued input from the Care Experienced Education Team (Virtual Head
Teacher and Health and Wellbeing Liaison Officers); and 
4. agreed that the Chief Education Officer continues to provide updates on the improved
outcomes for Care Experienced Children and Young People to the Corporate
Parenting Board and Business Continuity Committee/Community Services Committee. 
(Reference: Report by Executive Director with responsibility for Education dated 6 March
2025, submitted) 
Page 5

Page 6

9. IMPROVING OUTCOMES THROUGH SCOTTISH ATTAINMENT CHALLENGE
FUNDING 
The Committee gave consideration to a report providing an update on how the Council is
utilising Scottish Attainment Challenge (SAC) funding in order to improve outcomes for
children and young people in Argyll and Bute through addressing the challenges of the
poverty-related attainment gap. 
Decision 
The Community Services Committee – 
1. noted the progress made toward achieving the aims and objectives of the Argyll and
Bute Strategic Equity Funding Plan ‘SEF plan 2023- 26: Tackling the Poverty Related
Attainment gap in Argyll and Bute’; 
2. noted the update on 2024-25 Scottish Government Pupil Equity and Strategic Equity
Funding; 
3. noted the provision of strategic guidance at Scottish Government and Authority levels
to support the implementation of the Pupil Equity Funding and Strategic Equity
Funding; 
4. commended the very good progress towards achieving the 2023- 2024 stretch aims;
and 
5. agreed that further updates on the Scottish Attainment Challenge would be presented
to a future meeting of the Community Services Committee. 
(Reference: Report by Executive Director with responsibility for Education dated 31
January 2025, submitted) 
Councillor Iain Paterson left the meeting during consideration of the following item of
business. 
10. COUNSELLING IN SCHOOLS 
The Committee gave consideration to a report providing an update on the delivery and
impact of the Counselling in Schools service from October 2023 – December 2024. 
Decision 
The Community Services Committee – 
1. noted the continued positive impact Counselling in Schools has had on children and
young people’s wellbeing since its inception in January 2023, and supported the on-
going commitment to deliver this service within all schools; 
2. agreed the continued need for support across the Health and Social Care Partnership
and the Education Service to further embed this service within current processes,
ensure a clear continuum of support and improve access for children and young
people; and 
Page 6

Page 7

3. noted that a successful approach requires joint working between Education
establishments and the Counselling in Schools Service as partners in co-facilitation
including the use of school spaces for young people to access their counselling
sessions. 
(Reference: Report by Executive Director with responsibility for Education dated 6 March
2025, submitted) 
11. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - DALMALLY PRIMARY
SCHOOL 
The Committee gave consideration to a report detailing the outcome and findings of the
statutory consultation exercise undertaken in respect of the formal Proposal to rezone the
catchment area for Dalmally Primary School so that it is extended to include the whole of
the catchment area of the former Bridge of Orchy Primary School, as detailed in the
published Consultation Report; and in accordance with the requirements of the Schools
(Consultation) (Scotland) Act 2010, as amended (the 2010 Act). 
Decision 
The Community Services Committee – 
1. considered the content of the Consultation Report; and  
2. approved the implementation of the Proposal to rezone the catchment area for
Dalmally Primary School so that it is extended to include the whole catchment area of
the former Bridge of Orchy Primary School, with effect from 6th March 2025. 
(Reference: Report by Executive Director with responsibility for Education dated 28
January 2025, submitted) 
12. LUING PRIMARY SCHOOL - MOTHBALLING REVIEW 
The Committee gave consideration to a report providing an update on the current situation
of Luing Primary School. The report proposed a number of measures under which the
Education Service can monitor the position of the School over the forthcoming year. 
Decision 
The Community Services Committee agreed that – 
1. Luing Primary School continue to be mothballed on a temporary basis, and that the
building be retained for one year on a care and maintenance basis; 
2. officers would conduct a review of the School’s mothballing ahead of the Committee’s
March 2026 meeting; and 
3. the community would have pre-arranged access to the building to promote any
community functions during the period of continued mothballing. 
(Reference: Report by Executive Director with responsibility for Education dated 5
February 2025, submitted) 
Page 7

Page 8

13. FINAL ATTAINMENT AND ACHIEVEMENT REPORT - SESSION 2023-2024 
The Committee gave consideration to a report providing an update on final attainment
across all Argyll and Bute Secondary Schools. 
Decision 
The Community Services Committee – 
1. considered the information in the report, particularly as it related to the attainment
performance of school leavers; 
2. noted the increase in attainment brought about by successful appeals, at authority
level and school-by-school; 
3. noted that the information contained in the report constituted all attainment across both
National Qualifications and Wider Achievement courses, the latter of which was
described in the December report without the associated tariff points having been
included in statistics; and 
4. noted the difficulty in making meaningful comparisons with leavers cohorts over the
last few sessions due to alterations in assessment methods and also shifting patterns
of school leaving, which are not unique to Argyll and Bute and have occurred
nationally. 
(Reference: Report by Executive Director with responsibility for Education dated 6 March
2025, submitted) 
14. EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
The Committee gave consideration to a report detailing all external education
establishment inspection reports received across Argyll and Bute Education Service
during the period December 2024 to March 2025. 
Decision 
The Community Services Committee agreed to note – 
1. the content of the report; 
2. this quarterly report would be presented on an ongoing basis to the Community
Services Committee detailing all establishment inspections conducted and published
by Education Scotland within that period; and 
3. that Ward members would receive copies of school inspection reports for schools
within their area as published by Education Scotland. 
(Reference: Report by Executive Director with responsibility for Education dated 6 March
2025, submitted) 
15. COMMUNITY SERVICES COMMITTEE WORK PLAN 2023/2024 
The Community Services Committee work plan for 2024-2025 was before the Committee
for information. 
Page 8

Page 9

Decision 
The Committee noted the contents of the work plan. 
(Reference: Community Services Committee Work Plan 2024-2025, submitted) 
Page 9

Page 10

This page is intentionally left blank

Page 11

OFFICIAL
OFFICIAL  
x  
Argyll & Bute
Performance Summary Report 
Reporting Period: April 2024 to March 2025
Total Crime 83 Crimes
Incidents
19,969
Overall Dishonesty 812
Domestic Abuse Inc 
680
+16.4% -3% +4.1%
+17% -0.4% -25%*
Road Deaths &
Serious Injuries
57
-14.3%*
Sexual Crime
236
-1591*PYTD, -1240*5YR AVG +108*PYTD, +193*5YR AVG -25*PYTD, +77*5YR AVG +27*PYTD, +19*5YR AVG
+161*PYTD, +299*5YR
AVG
+1*PYTD, +11*5YR AVG -19*on PYTD -280*PYTD  
Violent Crime
1103
Missing People
137 Counter Terrorism
-10*PYTD
-6.8%*
-34*PYTD, -25*5YR AVG
Common Assault 765
-35.4%
Housebreaking
62 
Disorder Complaints
1677
The National Terrorism Threat level is 
SUBSTANTIAL
This means that an attack is likely. 
*PYTD = Previous Year to Date
*5YR = 5 year average 
-1.3%
-7.4%
Page 11 Agenda Item 4

Page 12

OFFICIAL
OFFICIAL  
SECTION PAGE NUMBER 
Introduction 2 
Executive Summary 3
Demand Analysis 4
Acquisitive Crime 5
Public Protection 6
Road Safety 7
Serious Organised Crime 8
Violence  9
Antisocial Behaviour 10
Public Confidence - Complaints & Allegations 11
Introduction 
I am pleased to present this performance summary report to Committee for its information and         
consideration. The Reporting Period for this report is cumulative for Quarters 1 to 4 of 2024/25, with
available figures being shown from 1st April 2024 through to 31st March 2025. 
Please note that all data included in this report are management information and not official statistics.
All data are sourced from Police Scotland internal systems and are correct as of date of publication.
Unless stated otherwise numerical comparisons are against the previous year to date and the previous
five year average for the same data period specified. 
Crimes and offences are grouped under recognised categories for statistical purposes.  The Scottish
Government defines these categories, as follows: 
Group 1 - Non Sexual Crimes of Violence  Group 6 - Miscellaneous Offences 
Group 2 - Sexual Crimes  Group 7 - Offences relating to motor vehicles 
Group 3 - Crimes of Dishonesty  PYTD  - Previous Year to Date 
Group 4 - Fire Raising, Malicious Mischief  CYTD - Current Year to Date 
Group 5 - Other (pro activity) Crimes   
Page 12

Page 13

OFFICIAL
OFFICIAL 
PRIORITY
AREA EXECUTIVE SUMMARY 
Acquisitive
Crime  
At the end of March 2025, acquisitive crimes show a slight reduction of 3% from
837 to 812 crimes. Increases in shoplifting and fraud crimes have continued to
be offset by a reduction in the number of housebreakings and common thefts. 
Public
Protection  
Group 2 sexual crimes remain relatively unchanged compared to last year.
Serious sexual crimes have seen a marginal increase however there has been
a reduction in crimes pertaining to indecent images/communications. 
Road Safety &
Road Crime
We continue to record a positive reduction in the number of casualties involved
in road traffic collisions within Argyll and Bute compared to last year. 
The number of fatal road traffic collisions within Argyll and Bute has risen
marginally by 1 as at the end of March 2025 from 7 to 8. 
Road traffic collisions involving serious and slight injuries however have
decreased considerably from 69 to 49 and 91 to 78 respectively. 
Serious
Organised
Crime 
At the end of March 2025, drug supply offences have increased slightly by 8.8%
compared to the previous year, whilst possession charges have continued to
see a reduction from 444 to 404 crimes. 
Across Argyll & West Dunbartonshire 18 persons linked to serious and
organised crime have been arrested and £3,496,132 (as at Feb 25) has been
seized under the Proceeds of Crime Act 2002 (POCA). 
Violence &
ASB
At the end of March 2025, Group 1 crimes of violence have increased with 1103
crimes compared to 942 the previous year to date, while anti-social behaviour
(ASB) related crimes have also risen by 21.3% from 694 to 842. 
1. Acquisitive Crime
2. Public Protection
3. Road Safety & Road Crime
4. Serious Organised Crime   
5. Violence & Anti-social behaviour 
ARGYLL & BUTE POLICING PRIORITIES 2023-2026
Page 13

Page 14

OFFICIAL
OFFICIAL 
CRIME PYTD CYTD INCIDENTS PYTD CYTD
Total Crimes &
Offences 6539 6456 Total number of 
incidents 21,560 19,969
DEMAND ANALYSIS - * PYTD - PREVIOUS YEAR TO DATE CYTD - CURRENT YEAR TO DATE
* *
*
*  
The total volume of crimes and offences recorded within Argyll and Bute has decreased by 1.3%
from the previous year but remains slightly above the previous 5 year average. Despite the overall
reduction in crime levels there have been notable increases in both crimes of violence (+17%)
and anti-social offences (+12.3%). Group 2 sexual crimes have remained relatively consistent
year on year while crimes against society, acquisitive crime and miscellaneous offences have all
experienced a reduction as at the end of Qtr. 4. 
Page 14

Page 15

OFFICIAL
OFFICIAL   
ACQUISITIVE CRIME
Shoplifting crimes have increased by 14.6% with 228 crimes recorded compared to 199
the previous year, the figure remains above the previous 5-year average (146), which is
in line with the national position. The detection rate has reduced marginally from 77.9%
to 75%, however in number terms 16 more crimes have been detected. 
Housebreaking crimes have seen a reduction from 96 to 62 at the end of Qtr. 4 compared
to last year. This is largely due to a 33% decrease in housebreakings at domestic
dwellings (-22 crimes), while non dwelling properties have also seen a decrease (-11
crimes). The detection rate for housebreaking has reduced marginally from 27% to 25.8%. 
Fraud has increased slightly in Argyll and Bute compared to last year, from 196 to 204
recorded crimes. This is primarily due to an increase in frauds involving bank account
compromises (+13). The detection rate for fraud has increased from 15.3% to 23.5%.
Perpetrators of such offences are generally based out with the UK. 
We continue to target those involved in shoplifting offences, many of whom are linked to
organised travelling crime groups. We have successfully identified a number of such travelling
criminals via our partnership with Retailers Against Crime (RAC) who assist with the
identification of these individuals. 
We are working with colleagues across the force to target known individuals and groups. We
are also in the process of implementing a new IT process which will make the transfer of large
evidential data files easier between businesses police Scotland and the COPFS. 
During this reporting period we have seen a number of online frauds recorded. These frauds
relate to online sales sites such as Facebook marketplace and online investments such as
Crypto Currency. Our pro-active work to protect the public from fraud continues. We are
delivering inputs to groups and utilising our social media presence to maximum effect. Our
relationship with our colleagues in Trading Standards is strong and we are installing call-
blockers to landlines when appropriate which is a device to add a level of protection against
the automated type of fraudulent call. 
Page 15

Page 16

OFFICIAL
OFFICIAL   
Our specialist officers within our CID team have realigned to create a single Domestic Abuse & Rape
Investigation Unit (DARIU) to better triage risk and prioritise enquiries which can be allocated to an
increased number of officers working across enquiries within the same unit. Given the volume of historical
offences reported, the increase in rape detections is especially notable. This level of work is bringing
matters to a speedier conclusion for victims and allowing for safety measures such a bail conditions to be
put in place to protect these individuals from further harm.
The creation of this unit will also increase our capability to target perpetrators of domestic violence across
A&B. We are working daily to break this cycle including work within the schools’ delivering inputs on
consent, misogynistic behaviours among young males and working with partners to deliver online sexual
violence presentations. 
We have engaged with GP surgeries in the area providing advice and guidance on the Herbert Protocol
which is a pre-prepared information pack for those living with dementia who are at a higher risk of going
missing. We have asked the pack to be provided or discussed with families at diagnosis. The information
can be provided immediately to police should the person go missing.             
At the end of Qtr. 4, Group 2 crimes have remained fairly consistent with 236 crimes recorded
compared to 237 (-1) in the same period last year. Both the crime of ‘rape’ and ‘sexual assault’ have
seen marginal increases from 45 to 46 crimes and 77 to 82 respectively, while crimes relating to
indecent images/communications have seen a reduction. 
Approximately 85% of rape crimes occurred in a private setting and 86% were committed by persons
known to the victim. 92% of sexual assaults were committed by persons known to the victim.  37%
related to non-recent reports. The detection rates for both the crime of rape cand sexual assault have
increased from 44.4% to 45.7% and 48% to 62.2% respectively, year on year.   
Domestic abuse incidents have increased slightly by 4.1% compared to last year from 653 to 680,
while the number of crimes recorded has also seen a considerable rise from 429 to 688. The
crime/incident conversion rate has also increased by 4.4% from 55% to 59.4%. 
A total of 137 missing person reports had been recorded within Argyll and Bute as at end of Qtr. 4,
which is a reduction of 6.8% from last year (-10). MP reports relating to adults have reduced from 96
to 66 (-30), while reports relating to children and children in care have seen an increase from 49 to
66 (+17) year on year. 
PUBLIC PROTECTION
Page 16

Page 17

OFFICIAL
OFFICIAL 
At the end of Qtr. 4, the number of fatal RTC’s recorded in Argyll and Bute has risen marginally from
7 to 8 year on year. Both serious and slight injuries however have seen notable reductions from 69 to
49 (-20) and 91 to 78 (-13), respectively. 
Road traffic offences have also seen a reduction of 11% in Argyll and Bute from 2163 to 1926 (-237)
with the majority of crime times experiencing a decrease compared to the same period last year. 
Road Traffic Casualties 2023/24 2024/25 
Number of persons killed on our roads 7 8
Number of persons seriously injured 69 49
Number of persons slightly injured 91 78
Number of children seriously injured 6 0
Overall, there continues to be a reduction in the number of casualties involved in road traffic collisions within
A&B compared to last year. 
Speeding and driving complaints remain prevalent across A&B. We continue to support community concerns
in this area through direct action, prevention and intervention work. Proactive speed checks have been
carried out across hot spot areas. We continue to work with partners including A&B council looking for
innovative ways to positively influence road users.
Our proactive and determined approach to reducing road deaths during the last quarter (from January 2025)
resulted in 29 detections for those driving whilst unfit through drink or drugs, 48 detections for careless
driving and 21 for the more serious dangerous driving.
Our preventions team continue to work with partners across our communities at road safety planned events.
These events have been well received and allow a multi-agency approach to improving safety on our roads.
where we can positively influence driver behaviour and understand community concerns.
As we approach our peak time across our road’s networks our national Roads Policing Team will be
providing a high visibility presence across Argyll, they will also be delivering initiatives such as ‘Operation
Close Pass’ which is aimed at tackling dangerous overtaking of cyclists and raising cyclist awareness
amongst other road users. 
Our national motorcycle unit will be out supporting local policing across Argyll in the coming period
specifically to encourage safe and responsible road use by motorcyclists. There focus will be engagement,
education and enforcement. 
We are also working with the Safety Camera Partnership to have their speed detection van deployed at
various locations again to deter and detect those intent on speeding. 
ROAD SAFETY AND ROAD CRIME
Page 17

Page 18

OFFICIAL
OFFICIAL 
Across Argyll & West Dunbartonshire, 18 persons linked to serious and organised crime have been
arrested and £3,496,132 (as at Feb 25) has been seized under POCA since 1st April 2024.  
At the end of Qtr. 4, drugs supply charges show an increase of 8.8% compared to last year from 34 to
37 crimes, which is in line with the previous 5-year average (36). 
Drug possession charges have seen a 9% reduction from 444 to 404 and are also marginally below
the previous 5-year average (407). 
The work of our Serious and Organised Crime Team continues to impact on the criminal activities
of those involved. The seizure of £3,496,132 under POCA since 1st April 2024 is a very significant
amount of money. Money that will not be re-invested into further illegal activity including the supply
of illegal drugs which brings so much misery to many. This sum of money is a 34.5% increase on
the sum arrested by the end of Q3 which was £2,595,658. 
In the reporting period from January, we had 83 recorded offences where persons have been
found in possession of controlled drugs. We have also had 3 recorded offences where persons
have been found in possession of a controlled drug with the intention to supply. We continue to
engage with our communities across Argyll maximising local intelligence to help us target those
involved with the sale and supply. 
Drug deaths are thankfully decreasing year on year and this in part is down to the ongoing work
between us and many of our partners across the Third Sector who are referring, supporting,
signposting and diverting those involved in criminality to fund an addiction. 
Police Scotland continue to contribute to the Alcohol & Drug Partnership, Drug Death Review
Group, Rapid Action Drug Alerts & Response (RADAR) Group to reduce the number of people
dependent on drugs and alcohol while supporting those impacted by the individual’s addiction 
SERIOUS & ORGANISED CRIME
Page 18

Page 19

OFFICIAL
OFFICIAL        
VIOLENCE 
All operational officers across our towns and villages in A&B are briefed daily prior to deployment
to furnish them with the intelligence and information required to be able to identify those involved
in violence and ASB. This will include known weapon carriers, violent individuals and those
subject to specific bail conditions that have been granted to restrict their activities. Our officers
are pro-actively patrolling these areas and people with the intention of reducing their negative
impact on the community and the likelihood of them re-offending. 
We continue to utilise analytical evidence to deploy our teams according to demand. We
maximise our resources at peak times in towns such as Oban, Campbeltown, Dunoon, Bute and
Helensburgh when we know excessive alcohol and or drug misuse may influence decision
making. We engage and support our nighttime economy by carrying out licensed premises
checks. These checks help identify risks and allow us to deliver effective early intervention to
situations which may have otherwise escalated. 
Locally we are supporting our officers who are victims of assaults by supplementing existing
officer safety training. We are focusing on officer wellbeing by ensuring they feel supported and
have confidence delivering the specialist training they receive annually. 
Crimes of violence occurring within Argyll and Bute have risen by 17% from 942 to 1103 (+161)
year on year with the current figure also 37% above the previous 5-year average (804). Crimes
were largely spilt 50/50 in terms of public and private space however approx. 60% of those
occurring in a public space were committed by persons known to the victim. 
Much of the increase in crimes of violence is due to an increase in common assaults (+108) and
common assaults on police and emergency workers (+41). Common assaults were largely spilt
50/50 in terms of public/private space and in approx. 69% of public space crimes offenders were
known to the victim. The increase in crimes is largely due to a rise in domestic related assaults
(+52) and disputes between friends/neighbours (+33). The increase in assaults on police and
emergency workers is due to slight increases in Dunoon (+15) and Rothesay (+8) compared to the
PYTD. 
The detection rate for crimes of violence overall remains fairly consistent at 68%, which is relatively
unchanged from 2023/24, however in number terms an additional 113 crimes have been detected.   
Page 19

Page 20

OFFICIAL
OFFICIAL 
Across the recording period the number of ASB related incidents in Argyll and Bute have reduced
by approx. 9.8% (-247) compared to last year. Group 6 crimes, which include ASB related
offences have increased by 21.3% with 842 crimes recorded compared to 694 the previous year. 
This is largely attributable to a rise in breach the peace/threatening and abusive behaviour
(+111) and alcohol related offences (+19). 
ANTI-SOCIAL BEHAVIOUR 
The reduction in ASB related calls is pleasing and we continue to work daily with our
colleagues at A&B council and housing providers across Argyll to great effect. We are pro-
actively visiting problematic tenancies with the ASB Team to impact on any ASB at the earliest
possible opportunity. This information is then briefed out to local policing to ensure they are
aware of ongoing demand and intelligence. 
Our officers are fully utilising alternatives to prosecution options whereby they are issuing fixed
penalty notices and warnings for minor ASB related offences. This ensures we continue to
maximise our resources within the community at peak times without our officers being
abstracted to custody.  
The Preventions Team at Dumbarton are in daily contact with the ASB and Housing Teams
across A&B. Requests can range from a single email to a full disclosure which is required
when legal action is being taken against a resident. Across A&B we have made in excess of
300 disclosures.  The partnership work between the local authority, housing providers and
Police Scotland is a very strong effective partnership.                           
Page 20

Page 21

OFFICIAL
OFFICIAL 
PUBLIC CONFIDENCE: COMPLAINTS & USER SATISFACTION
Overall satisfaction with Police Scotland
User Satisfaction results show that locally, public confidence levels remain high within Argyll and
West Dunbartonshire with overall satisfaction levels at 73%, which is slightly above the position
as at the end of the 2022/23 reporting period. 
Useful Links/Contacts
• Argyll and Bute Communtiy Directory - https://abcd.scot/ including warm spaces information
• Crimestoppers – Crimestoppers in Scotland | Crimestoppers (crimestoppers-uk.org) 0800 555
111
• Scottish Partnership Against Rural Crime – www.scottishparc.co.uk 
• Women’s Aid - Home - Women's Aid (womensaid.org.uk) 
• Citizens Advice – 0808 164 6000
• Argyll and Bute Council Trading Standards – 01546 605 519
• Argyll and Bute Council – https://www.argyll-bute.gov.uk/my-council/how-contact-us 
• Transport Scotland – road related incidents and road closures -
https://www.traffic.gov.scot/traffic-information/incidents
• Scottish Water - https://www.scottishwater.co.uk/Help-and-Resources/Contact-Us 0800 0778
778
• NHS24 (including mental health support) – 111 or https://www.nhsinform.scot/ 
73%
Satisfied/Very
Satisfied
Total of 
562
responses
Police Estates 
Isle of Bute 
We are delighted to confirm that work has commenced
on the Isle of Bute to renovate the existing police
station. These extensive works will ensure that we are
future proofing policing on the Isle of Bute for years to
come. Local communications will be delivered over the
coming period to highlight any impact in the short term
to the local community. 
Oban 
Replacing Oban police station is a priority for Police
Scotland. Our estates team will carry out detailed
research to identify potential estate solutions where
officers can serve the town and wider area effectively.
No decisions have been taken at this time. There may be
further public consultations launched in the future
when we have identified a site. In the meantime, we will
make necessary repairs and investment to the existing
building to ensure it meets health and safety
requirements. 
Page 21

Page 22

This page is intentionally left blank

Page 23

Scrutiny Report
2024-25 Q4
Argyll & Bute Performance and
Scrutiny Group
Argyll and Bute
Page 23 Agenda Item 5

Page 24

1
2
3
4
5
6
7
8
9
10
11
12
13
Summary
Trends
Accidental Dwelling Fires (ADFs)
Accidental Dwelling Fire Casualties
Non-Fire Casualties
Deliberate Fires
Non-Domestic Fires
Unwanted Fire Alarm Signals (UFAS)
Road Traffic Collisions (RTCs)
Home Fire Safety Visits (HFSVs)
Fire Safety Enforcement
Community Safety & Engagement
Glossary of Terms
Contents
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 12
Page 13
Page 14
About the statistics within this report
The activity totals and other statistics quoted within this report are published in the interests of
transparency and openness. They are provisional in nature and subject to change as a result of ongoing
quality assurance and review. Because all statistics quoted are provisional there may be a difference in
the period totals quoted in our reports after local publication which result from revisions or additions to the
data in our systems. The Scottish Government publishes official statistics each year which allow for
comparisons to be made over longer periods of time.
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Scrutiny Report
2024-25 Q4
Argyll & Bute Performance and Scrutiny
Group
Argyll and Bute
Page 24

Page 25

1. Summary
72
Fires
90 180
False Alarms
342
20 1 0
Fire Fatalities
8 5
66
UFAS
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Non-Fire Incidents
People Rescued by
Firefighters
People Receiving
First Aid or Hospital
Treatment (Non-Fire)
People Receiving
First Aid or Hospital
Treatment (Fires)
Non-Fire Fatalities
Top 10 Incident Types
False Alarm
(Due to
Apparatus)
False Alarm
(UFAS)
False Alarm
(Good Intent)
Fire (Building) Inter-Agency Fire
(Outdoor)
Vehicle
(Non-fire)
Other
Non-Fire
Humanitarian Securing
Scene
73 66
41 40 38
27
17
12
9 9
2024-25 Q4
81
Fire Safety Audits
62
Home Fire Safety Visits
Total Incidents
(Incl. Incompletes)
In this report, the Scottish Fire and Rescue Service(SFRS) has demonstrated a strong commitment to public safety. We 
attended a range of operational incidents, which are detailed above. Home Fire Safety Visits(HFSV) continue to be a 
priority, and we conducted 62 visits over this recording period. Details of our new HFSV referral pathway are included in 
section 12 of the report. 
Fire safety audits and community engagement initiatives remain proactive measures, ensuring our communities are safer 
places to work, live, and visit. 
The overall trend in this report reflects a steady management of all incidents, with fluctuations reflecting seasonal variations.
Accidental dwelling fires are well monitored, while the service also continues to focus on reducing deliberate fires and 
non-fire incidents. The data provided highlights a well coordinated approach to fire prevention and emergency response.
Page 25

Page 26

2. Trends
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Accidental Dwelling Fires
2021-22
Q1
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
18
16
24
10 10
24
22
13 13
17
17
16
18
12
18
20
Deliberate Fires
2021-22
Q1
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
57
13
5
11
40
6
22
16
9 812
25 21 18
11 8
Non-Domestic Fires
2021-22
Q1
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
10 11
2
3
10 10
4
7
67
8 7
5 6
8
4
Unwanted Fire Alarm Signals
2021-22
Q1
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
118 66
209
56
189
142
75 6577
150147 158
185
6968
168
Road Traffic Collisions
2021-22
Q1
2021-22
Q2
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
11
16
25
8
23
12
18
11
18
12
13
15
19
12
18
13
Previous 16 quarters (4 years)
Page 26

Page 27

3. Accidental Dwelling Fires
Extent of Damage Incidents

Not applicable 11
Limited to item 1st ignited 2
Limited to room of origin 2
Limited to floor of origin (not whole
building)
1
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Source of Ignition (Top 10)
Cooking appliance Heating equipment Other domestic
style appliance
Electric Lighting Not known Other Other appliance or
equipment
8
2 2
1 1 1 1
Trend by Quarter (4 years)
10
15
20
16
Accidental Dwelling Fires
in this period
2024-25 Q4
Incidents by Ward
Isle of Bute
Cowal
Helensburgh & Lomond South
Helensburgh Central
Lomond North
Oban South & the Isles
Dunoon
Kintyre & the Islands
Mid Argyll
3
2
2
2
2
2
1
1
1
SFRS employs a range of proactive measures to prevent fires before they start. One of their key initiatives is the HFSV program,
where Community Action Teams(CAT) and Operational Crews visit homes to assess fire risks and provide tailored advice on fire 
prevention. These visits often include the installation of smoke alarms and heat detectors to comply with Scottish Government 
legislation thus ensuring that homes are equipped to detect fires early. 
Over this quarterly reporting period we seen a slight increase in accidental dwelling fires across Argyll and Bute from 13 to 16 which 
we will continue to monitor.
SFRS is dedicated to reducing accidental dwelling fires in domestic properties across Scotland. This commitment is evident through 
our proactive measures, community engagement, and continuous improvement strategies.
Page 27

Page 28

4. Accidental Dwelling Fire Casualties
Non-Fatal
Casualties
1
Fatal
Casualties
0
Nature of Injury/Cause of
Death
Casualties

Overcome by gas, smoke or toxic
fumes; asphyxiation
1
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Helensburgh Central 1
Trend by Quarter (4 years)
0
2
4
1
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
0 1
First Aid Given
at Scene
Hospital Slight
Injuries
0
Hospital Serious
Injuries
2024-25 Q4
SFRS is committed to reducing accidental dwelling fire casualties across all communities in Scotland. This dedication is reflected in 
our comprehensive reduction strategies, community focused initiatives, and continuous efforts to improve fire safety. Through strategic
initiatives, community engagement, a data-driven approach, support for vulnerable groups, and continuous improvement, we strive to
make every home in Scotland safer. Our efforts not only save lives but also foster a culture of fire safety awareness and prevention 
within our communities. 
Over this reporting period the numbers remain low, we attended one incident with a casualty requiring hospital treatment. There were 
no fatal accidental dwelling casualties reported over this quarter.
Page 28

Page 29

5. Non-Fire Casualties
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Kintyre & the Islands
Oban North & Lorn
South Kintyre
Cowal
Helensburgh & Lomond South
Isle of Bute
Lomond North
Oban South & the Isles
4
2
2
1
1
1
1
1
Trend by Quarter (4 years)
10
20
30
40
Non-Fatal
Casualties
8
Fatal
Casualties
5 19
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
0 5
First Aid Given
at Scene
Hospital Slight
Injuries
3
Hospital Serious
Injuries
Nature of Injury/Cause of Death Casualties

Back / Neck injury (spinal) 4
Chest pain / Heart condition / Cardiac
arrest
3
Other 2
Fracture 1
Hypothermia 1
Not known 1
Other physical injury 1
2024-25 Q4
During this reporting period, we responded to a range of non-fire related incidents. This can include incidents such as road traffic 
collisions, water rescues, and other specialist operations. 
Tragically, we attended five incidents that involved fatal casualties. All of these incidents were non-fire related. Our crews were 
mobilised primarily to support partner agencies such as Police Scotland and the Scottish Ambulance Service. The majority of these 
responses were incidents involving to out of hospital cardiac arrests, with one fatal road traffic collision occurring in Campbeltown. 
This is also captured in section 9 of this report. 
Page 29

Page 30

6. Deliberate Fires
Property Type Incident

Refuse 4
Dwelling 2
Grassland, woodland and crops 2
Non Residential 2
Other outdoors (including land) 2
Road Vehicle 1
Hour of Day
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Helensburgh & Lomond South
Kintyre & the Islands
Helensburgh Central
Isle of Bute
Cowal
Dunoon
Oban South & the Isles
3
3
2
2
1
1
1
Trend by Quarter (4 years)
0
20
40
60
13
Deliberate Fires
in this period
2024-25 Q4
We are committed to reducing deliberate fire setting, recognising the significant dangers it poses to communities and the environment. Deliberate
fires can endanger lives, cause property damage, and divert valuable resources away from genuine emergencies. We have several strategies to 
reduce this type of incident including: 
Community Engagement: We actively engage with communities to raise awareness about the risks and consequences of deliberate fire setting. 
This includes educational programs aimed at children and young people across Argyll and Bute schools. 
Collaboration with Partners: We collaborate with various partners, including Police Scotland, Community Wardens and with local schools. 
Reporting and Prevention: We encourage the public to report any suspicious activities or build up of rubbish that could potentially be set on fire.
Over this reporting period we continue to see a reduction over the 4 year trend highlighted in the graph above.
Page 30

Page 31

7. Non-Domestic Fires
Top 15 Property Types
Property Type Incidents

Hospitals and medical care 3
Hotel/motel 2
Retail 2
Education 1
Industrial Manufacturing 1
Offices and call centres 1
Permanent Agricultural 1
(81.8%)
2 (18.2%)
9
Accidental
Deliberate
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Lomond North
Oban South & the Isles
Kintyre & the Islands
Helensburgh Central
Mid Argyll
South Kintyre
3
3
2
1
1
1
Extent of Damage
Not applicable Limited to item 1st ignited Limited to room of origin
8
2
1
Trend by Quarter (4 years)
5
10
11
Non-Domestic
Fires in this
period
2024-25 Q4
We are dedicated to reducing non-domestic fires, recognising the significant impact these incidents can have on businesses, public 
buildings, and the wider community in Argyll and Bute. Non-domestic fires can lead to substantial economic losses, disrupt services, and 
pose serious risks to public safety. 
Our local Fire Safety Enforcement(FSE) team acts as an enforcing authority for fire safety legislation in non-domestic premises. This 
includes regular inspections and ensuring compliance with fire safety regulations. Our enforcement team is also there to provide support
and education to duty holders, including building owners, managers, and staff, to help them comply with current legislation. 
Over this recording period we seen an increase in Non-Domestic fires from 7 to 11. Our FSE team will continue to monitor and take 
appropriate audit inspections if required.
Page 31

Page 32

8. Unwanted Fire Alarm Signals
Top 15 Property Types
Property Type Incidents

Hotel/motel 13
Residential Home 13
Hospitals and medical care 12
Sheltered Housing - not self contained 5
Boarding House/B&B other 4
Nurses'/Doctors' accommodation 4
Other Residential Home 4
Education 2
Offices and call centres 2
Other holiday residence (cottage, flat,
chalet)
2
Retail 2
Entertainment and culture 1
Laboratory/research Establishment 1
Youth hostel 1
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Oban South & the Isles
Mid Argyll
Isle of Bute
Lomond North
Helensburgh Central
Oban North & Lorn
South Kintyre
Cowal
Dunoon
Kintyre & the Islands
13
12
9
9
8
6
4
3
1
1
Trend by Quarter (4 years)
0
100
200
66
Unwanted Fire Alarm
Signals in this period
2024-25 Q4
Unwanted Fire Alarm Signals are false alarms triggered by automatic fire alarm systems. These false alarms can be caused by various
factors, including break of manual call points, cooking fumes, dust, or lack of maintenance. UFAS incidents divert fire crews from
genuine emergencies, leading to unnecessary costs and potential delays in response to real fires.
Since the implementation of our revised policy, we continue to see a reduction in this type of incident, which is again highlighted in this
report.
SFRS introduced a new policy in 2023 aimed at significantly reducing Unwanted Fire Alarm Signals (UFAS). This policy is part of our
ongoing commitment to enhance community safety and improving the use of resources across Argyll and Bute.
Page 32

Page 33

9. Road Traffic Collisions
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Oban North & Lorn
Kintyre & the Islands
Cowal
Helensburgh Central
South Kintyre
Dunoon
Lomond North
Mid Argyll
5
3
2
2
2
1
1
1
Trend by Quarter (4 years)
15
20
25
17
Road Traffic
Collisions in
this period
Non-Fatal
Casualties
4
Fatal
Casualties
1 7
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
0 3
First Aid Given
at Scene
Hospital Slight
Injuries
1
Hospital Serious
Injuries
Property Type Incidents

Car 12
Multiple Vehicles 3
Lorry/HGV 1
Van 1
2024-25 Q4
Incident Type Incidents

Vehicle (Non-fire) 16
Other Non-Fire 1
The SFRS is committed to reducing the number of Road Traffic Collisions (RTC) across Scotlands road network. We recognise the 
devastating impact these incidents can have on individuals, families and communities. We have implemented a range of strategies and
initiatives aimed at prevention and effective response.
We work closely with Police Scotland and attend the 'L' Division Road Safety Governance group on a quarterly basis. This meeting
allows key stakeholders to identify new and existing risks and coordinate joint road safety strategies across Argyll and Bute. 
In this report we seen a decrease in RTC incidents from 25 to 17, however, one incident in January sadly resulted in a fatal casualty in 
the Campbeltown area.
Page 33

Page 34

10. Home Fire Safety Visits
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
11. Fire Safety Enforcement
Job Type Count

Audit 81
Short Post Fire Audit 3
Consultation 1
Audits by Ward
Oban North & Lorn
Oban South & the Isles
Cowal
Kintyre & the Islands
Dunoon
Helensburgh Central
Mid Argyll
South Kintyre
44
15
12
3
2
2
2
1
2024-25 Q4
HFSVs by Ward
Helensburgh Central
Cowal
Dunoon
Isle of Bute
Lomond North
Oban North & Lorn
Oban South & the Isles
Helensburgh & Lomond South
Kintyre & the Islands
Mid Argyll
South Kintyre
19
7
7
6
4
4
4
3
3
3
2
Home Fire
Safety Visits
62
High Risk
HFSVs
33
Partner Referral
HFSVs
23
The SFRS has recently introduced a new referral pathway for HFSVs, aiming to enhance community safety and better support 
vulnerable individuals. This initiative is part of our ongoing commitment to reduce fire risks and improve overall safety in homes across
Scotland. 
The revised HFSV programme focuses on a more targeted approach, prioritising high risk individuals who meet specific eligibility 
criteria. These criteria are based on extensive research into factors that increase the risk of fire fatalities. The goal is to ensure that 
those most vulnerable receive the necessary support and intervention to prevent fire incidents.
Page 34

Page 35

12. Community Safety & Engagement
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
2024-25 Q4
Doddie Aid Challenge 2025 
In February, our Area Management Team and operational staff participated in the 
Doddie Aid 2025 challenge, a 700-mile cycling event across Scotland to raise funds for 
the My Name'5 Doddie Foundation. 
The team embarked on a journey from Stranraer to Edinburgh via Aberdeenshire, 
aiming to arrive in time for the Scotland vs. Ireland Six Nations match on the 9th 
February. Their efforts raised over £17500 supporting vital research and awareness for
Motor Neuron Disease (MND), continuing the legacy of rugby legend Doddie Weir. 
The My Name'5 Doddie Foundation was established by rugby legend Doddie Weir in
2017 following his diagnosis with MND.The foundation is dedicated to funding research
to find a cure for MND, supporting those affected by the disease, and raising awareness
to educate the public. To date this years teams have raised just under 1 million pounds 
for the foundation.
Wildfire Education 
Home Fire Safety Visits 
On February 12th, we launched a new referral process for Home Fire Safety Visits. 
This update aims to better target high risk individuals, streamline referrals with a new 
digital system, and enhance data sharing through a Data Sharing Framework (DSF). 
SFRS is also providing training and support to partner organisations to ensure effective
use of the new system. These changes reflect SFRS's commitment to improving fire  
safety and reducing fire related incidents across Scotland. 
For further information please contact: 
W.EWDABCommunitySafety@firescotland.gov.uk 
Although not in this reporting period we'd also like to highlight the work our CAT and 
operational crews have been doing in relation to wildfire education in schools and 
within the local community in Argyll and Bute. Working closely with education, where 
we have delivered wildfire awareness/ASB sessions. 
We have also been engaging with members of the public and local land owners to 
highlight the dangers such incidents can cause to local communities. 
Education 
Over this quarter, our Community Action Team (CAT) supported various engagements
in Argyll and Butes secondary schools. This included delivering Water Safety 
Scotland's Ice Safety Workshop to help keep children safe near frozen bodies of water,
as well as attending career events in the councils secondary schools. 
The CAT also held an Emergency Service's workshop at Tobermory High to highlight 
the vital services our partners offer rural communities. Thanks to staff, pupils and 
partners who attended the event including SFRS, Police Scotland, HM Coastguard, 
RNLI and Scottish Ambulance Service. 
Page 35

Page 36

13. Glossary of Terms
Term - What it means
ADF
Accidental Dwelling Fire.
HFSV
Home Fire Safety Visit.
PDIR
Post Domestic Incident Response, a term used to indicate actions taken following attendance at a fire or
other incident in the home. PDIRs include amongst things the offer of a free follow up home fire safety
visit.
RTC
Road Traffic Collision.
Special Service
Calls to incidents which are not fires or false alarms such as RTCs, rescues, flooding, incidents involving
hazardous materials or the provision of assistance to other agencies.
UFAS
Unwanted Fire Alarm Signals. When an automatic fire detection and alarm system is activated as a result
of anything other than an actual fire the activation is classed as a false alarm. If an attendance is made to
such an event by the Scottish Fire and Rescue Service, then the event is recorded as an UFAS incident.
UFAS Policy Change
In response to COVID, on the 6th May 2020, the SFRS decided to send 1 pump to UFAS premises that
did not have their own Predetermined attendance (PDA).
As of 1st July 2023, the COVID interim 1 pump response was ended and a new UFAS policy was
implemented.
The new policy is to call challenge all UFAS incidents with the intention of non-attendance. Hospitals, care
homes, and sleeping risk premises are all exempt and receive either 2 pumps or their premise specific
PDA.
202512/05/25 © Scottish Fire & Rescue ServiceReport generated on
Page 36

Page 37

Design, figures and charts by the Business Intelligence team.
Page 37

Page 38

This page is intentionally left blank

Page 39

1 
Community Services Committee     
Date of Meeting:  5 June 2025 
Title of Report:   Argyll and Bute HSCP - Performance Report – FQ3 2024/25   (October –
December) 
Presented by:     Charlotte Craig – Interim Head of Strategic Planning, Performance &
Technology    
The Committee is asked to:
• Acknowledge performance for FQ3 2024/25 (October - December) 
• Acknowledge performance update on the National Health & Wellbeing Outcomes  
and Ministerial Steering Group Integration Indicators (Appendix 1) 
• Note Delayed Discharge Sitrep as of 06 January 2025 (Appendix 2) 
EXECUTIVE SUMMARY 
This report details performance for the Financial Quarter (FQ) 3 2024/25 (October - December), the
performance outputs are taken from the Integrated Performance Management Framework (IPMF)
Reporting Dashboard with the focus on twelve key service areas. Overall performance for FQ3 notes
42 of 84 measures reporting as on target (50%). 
The report details performance against each of the service areas and the 84 supporting Key
Performance Indicators. National Health & Wellbeing Indicators performance is included alongside
latest performance from the National Delayed Discharge Sitrep. The use of the new performance
Dashboard within SharePoint is designed to offer a more focused approach to the access and
analysis of data, offering scope for self-service.  
In consideration of the report the committee is reminded of the role of the Clinical and Care
Governance Committee in providing more in depth scrutiny of performance.  To ensure timely
consideration for the IJB a high level report has been presented to the IJB ahead of this with update
to follow in the next minute. 
2. RECOMENDATIONS
The committee are asked to acknowledge current FQ3 24/25 performance. 
3. DETAIL OF REPORT
The report details the HSCP (Health and Social Care Partnership) performance for FQ 3 2024/25
(October - December) highlighting key performance trends across the 84 KPIs (Key Performance
Indicators). The latest performance against the National Health and Wellbeing Outcomes Indicators
is reported (Appendix 1). Also included is the latest national update on Delayed Discharges
Page 39 Agenda Item 6

Page 40

2 
(Appendix 2).   
4. RELEVANT DATA & INDICATORS 
4.1 FQ3 2024/25 (October - December) Performance Summary         
Overall performance for FQ3 notes that 84 KPI’s are scoring against target, with 42 (50%) reporting
as on-track. This is a decrease of 8% from FQ2 position, where 49 KPI were on track (58%). The
KPI’s report performance against the target and include the target, actual and variance and is a mix
of both quantitative and qualitative indicators. The use of the green, amber and red graphics within
the Dashboard is used to give an overview of the HSCP’s total performance for each of the twelve
services and 84 KPI’s. The use of only green and red for the KPI’s is used to focus delivery with
regards to sustaining performance on or above target.   
4.2 Analysis of Key Performance  
This analysis identifies performance across the 12 service reporting categories within the Integrated
Performance Management Framework (IPMF). 
4.2.1 Children & Families  
Performance across 7 KPIs, Children & Families and Justice notes 4 (57%) on track, with 4 (43%)
off track, against the targets set for Q3 24/25. This is consistent with 57% noted as on track in
FQ2.    
Performance on or above target: 
• The percentage of Child Protection Register (CPR) cases that have an allocated Social
Worker remains on target at 100% for FQ3, with no change noted from FQ2 position.
Page 40

Page 41

3 
• The number of teams that have delivered 75% or more of the Universal Health Visiting
Pathway (UHVP) reports 87% for FQ3, up from 78% FQ2. 
• FQ3 Number of Public Sector staff who have received at least basic training in how to
identify and respond to women and children affected by Violence Against Women &
Girls reports cumulative 250 against cumulative target of 90. 
• Percentage of Criminal Justice social work reports submitted 2 days before court reports
is noted at 91% in FQ3, against 90% target and an increase from 82% reported in FQ2 
Performance below target & areas for improvement: 
• The percentage of Child Protection Planning Meetings (CPPM's) held within 28 days of
the initial referral reports 33% in FQ3 against 90% target and increase from 17% noted
in FQ2.
• Mental Health Services (CAMHS) children and young people seen within 18 weeks of
referral reports 39% FQ3 against 85% target and a decrease from 73% reported in FQ2.
• The number of statutory individual Health Assessments commenced within four weeks
of coming into care in FQ3 reports 75% down from 100% for FQ2 
4.2.2 Telecare and Digital
Performance across 13 Key Performance Indicators (KPIs) for Strategic Planning, Performance &
Technology Services shows 4 KPIs (31%) on track, with 9 KPIs (69%) reported as off track against
the targets set for FQ3 24/25. Performance on track reports a decrease of 7% from the reported
FQ2 24/25 position (38%) 
It should be acknowledged that nationally waiting time breaches are measured against a zero target.
Local targets have been set to monitor progress and improvements to reduce the number of patients
on waiting lists across varied health specialties.   
Performance on or above target:   
• The implementation of Just Checking activity monitoring equipment was successfully
completed in 8 homes, down slightly from 9 in FQ2 but remains above the target (7) for
FQ3. 
• Digital blood pressure monitoring in Primary Care continues to be rolled out, with 79
unique patients using the service by FQ3 against a target of 42, consistent with FQ2
levels.
• Currently, 45% of telecare clients have enhanced packages, which are on target and an
increase from 42% noted in FQ2. Further work is needed to accurately track this metric. 
• The e-health department resolved 100% of IT support requests during Q3, up from 99%
in FQ2. 
Performance below target & areas for improvement:   
• FQ3 reported 169 new clients to Telecare, a 23% decrease compared to the previous
quarter (219) and below the target of 200.
• Progress in the digitalisation of telecare equipment has increased by 11% to 65% for
FQ3, however this is below the 70% target set for the end of the period.
• Consultations delivered via Near Me have continued to decline, from 999 in FQ2 to 888
in FQ3, against the quarterly target of 1025, showing no growth.
• The number of telecare clients overdue for their annual review has decreased to 51%,
below the 50% target. Work is continuing to improve data quality around this measure. 
Page 41

Page 42

4 
• There were zero Silvercloud referrals reported in FQ3, a fall from 57 in FQ2 against the
quarterly target of 60.
• 96% of FOI requests were completed within the statutory timescale, against 100% and
down from 100% noted in FQ2.
• Waiting times for cancer appointments at 31 and 62 days reported 15 cases, an
increase from 12 in FQ2 against a target of zero.
• New outpatient waiting times breaches over 12 weeks were noted at 49%, compared to
the 46% target, no change from FQ2.
• Outpatient long waiting times (over 52 weeks) were noted at 4.8%, an increase from
3.3% in FQ2 and above the target of 2.8%. 
4.2.3 Primary Care
Performance across 10 Key Performance Indicators (KPIs) for Primary Care shows 6 KPIs (60%)
on track, with 4 KPIs (40%) reported as off track against the targets set for FQ3 24/25.  This is a
reported decrease of 10% from 70% on track in FQ2 24/25. 
Performance on or above target: 
• 81% of children who received Fluoride Varnish treatment did not require further dental
treatment, consistent with FQ2 levels.
• 54% of eligible residents have so far received their Winter Covid 19 booster. This is 7%
higher than the national average and up from 4% noted at FQ2 end.
• Across the HSCP GP practices operated the duration of FQ3 without resorting to
contingency measures. Decease from 55 instances noted in FQ2.
• GP practices remained at level zero during FQ3 resulting in no reduction in services
provided. 
• 4.5% of consultations by GPs and other HSCW within the primary care setting were
done digitally, meeting the target set (4.5%)
• Primary Care Out-of-Hours Services covered 50% of all recorded out of hour
consultations during FQ3, an increase from 46% in FQ 2 and exceeding their 45%
target.    
Performance below target & areas for improvement: 
• 2 GP practices were returned to HSCP Control during FQ3, above a zero target and an
increase from FQ2 (0).
• 93% of children at 12 months of age received their 6 in 1 vaccination missing the 95%
national target, down from 96% reported at FQ2. (data for this indicator is 1 quarter
behind due to availability of statistics) 
• The Oral Health Improvement Team only managed to deliver 94% of their planned
activity, down from 95% in FQ2 and against a target of 100%.  
• HSCP Dental services utilised 61% of clinic appointments, missing their 90% target.
This is an improved position from 48% noted in FQ2. 
4.2.4 Public Health
Performance across 5 Key Performance Indicators (KPIs) for Public Health shows 4 KPIs (80%) on
track against the targets set for FQ3 24/25. Performance on track reports a decrease of 20% from
the reported FQ2 24/25 position (100%). 
Performance on or above target: 
Page 42

Page 43

5 
  
• Increase the monthly number of quit dates set, supported by NHS smoking cessation
advisors or jointly through shared care with pharmacy, by people in the most deprived
40% areas in Argyll. Performance this quarter has significantly exceeded the target, with
28 quit dates achieved against a target of 10. Whilst significantly above target it shows a
3% decrease compared to FQ2.   
• Increase the number of engagement activities delivered in communities and supported
through Living Well Networks.  Performance continues to be above target, with an actual
of 29 against a target of 20.  This represents a 12% increase compared to FQ2. 
• Increase the number of referrals to community link workers supported by “We Are with
You”. Performance this quarter achieved approximately 44% above the target, with an
actual performance of 145 against a target of 101.  The actual number of referrals is
above target but 32% less than FQ2. 
• Number of instances working with Scottish Government or National Agencies on
National Strategy and Policy Development. This is a new measure for 24/25 with a
target initially set as 1.  FQ3 noted 13 instances of working with Scottish Government or
National Agencies on National Strategy and Policy development.  
Performance below target & areas for improvement: 
• Increase the number of people in Argyll and Bute attending training in the following
areas, Money Counts, Behaviour Change, Mental Health and Suicide Prevention. 
The rolling target from 23/24 continues into 24/25, with the expectation of 17 additional
clients each quarter.  In FQ3 we fell 4% short of our target with 114 attendances, against
a target of 119.    
4.2.5 Finance 
Performance across 6 KPIs for Financial services notes 1 (17%) on track, with 5 (83%) off track
against the targets set for Q3 24/25. This is a reported decrease of 66% from FQ2, where 5 (83%)
of KPIs were on track.    
Performance on or above target: 
• Older People External Residential actual spend reports 95%, this is 5% below projected
target in FQ3, with variance of 23% from the FQ2 position. 
Performance below target & areas for improvement: 
• Costs for Hospital Delayed Discharges in FQ3 report £453,500 (43%) over the target of
£317,000 and an increase from £306,500 in FQ2. 
• GP prescribing expenditure notes actual spend being £126,000 (0.6%) over the
projected spending target in FQ3. This is an improved position from FQ2, where
performance was noted as 2% over the target.  
• Agency and Locum staffing expenditure reports a reduction of 1%, failing to meet the
target reduction of 10%. However, this is an improvement on the FQ2 position, where a
6% increase was recorded.
• Older People Internal Residential actual spend notes being over projected target by 8%
for FQ3. This has increased from FQ2 position where 83% actual was noted.   
• FQ3 Older People Homecare actual spend reports being 4% above the projected target.
This is an increase from the FQ2 position, where actual was below projected 92%   
Page 43

Page 44

6 
4.2.6 Carers
Performance across 4 Key Performance Indicators (KPIs) for Carers shows 3 KPIs (75%) on track,
with 1 KPI (25%) reported as off track against the targets set for FQ3 24/25. Performance on track
is consistent with the reported FQ2 24/25 position. 
Performance on or above target:
• The number of Unpaid Carers Supported across A&B’s Carers Centres continues to be
over the target of 3000 per quarter, with a slight increase to 3483 (4%) noted from
previous FQ2.   
• The ACSP reviews, which now include welfare contacts, are well above target of 700
per quarter with 1739 achieved in FQ3 compared to 1396 in FQ2. 
• Young Carer Statements completed in FQ3 notes 53, is up from 35 recorded in FQ2 and
remains above the target of 4 
Performance below target & areas for improvement: 
• The number of Adult Carer Support Plans completed saw a significant increase this
quarter (+11%), rising from 114 to 127 - just below the target of 133. 
4.2.7 Allied Health Professionals 
Performance across 7 Key Performance Indicators (KPIs) for Allied Health Professionals shows 4
KPIs (57%) on track, with 3 KPIs (43%) reported as off track against the targets set for FQ3 24/25.
Performance on track reports a decrease of 14% from the reported FQ2 24/25 position (71%). 
It should be acknowledged that nationally waiting time breaches are measured against a zero target.
Local targets have been set to monitor progress and improvements to reduce the number of patients
on waiting lists across varied health specialties.    
Performance on or above target: 
• MSK Outpatient Referral waits breaching >4 weeks are slightly up in FQ3 to 1029 (+6%)
and meeting target of 1120.
• Outpatients waiting over 12 weeks for AHP services continue their trend downwards in
FQ3 – with a reported total of 467 against the target of 500.
• Community Patient Discharges saw a slight decline in FQ3, dropping from 2,034 to
2,027, while still exceeding the target of 1,632. 
• The percentage of New versus Return Outpatient Physio AHP Referrals remains above
the 30% target, with 31% noted in FQ3. 
Performance below target & areas for improvement: 
• AHP Priority 1&2 referrals breaching > 4 weeks in FQ2 reported 55 against a target of
48.
• Priority 3 and 4 Community Patient Referrals breaching over 12 weeks have increased
quarter on quarter, with FQ3 reporting 770 against a target of 400, up 35% from 558
noted in FQ2. 
Page 44

Page 45

7 
• AHP Outpatient Completed Waits decreased by 10% in FQ3, with 929 reported, just
missing the target of 945. However, this remains part of an overall upward trend over
the past year. 
4.2.8 Delayed Discharges 
Performance across 6 Key Performance Indicators (KPIs) for Delayed Discharges shows 2 KPI
(33%) on track, with 4 KPIs (67%) reported as off track against the targets set for FQ3 24/25.
Performance on track reports a decrease of 50% from the reported FQ2 24/25 position (83%)
For FY 2024/25 Delayed Discharges KPIs, we use a count at the end of quarter census point instead
of full month data, as this aligns better with national reporting. It should be acknowledged nationally
Delayed Discharges are measured against a zero target. Local targets have been set to monitor
progress and improvements to reduce the number of patients showing as a Delayed Discharge.   
Performance on or above target: 
• Reduce the Number of people delayed in hospital with AWI code at Monthly Census
Point. Performance was above target having achieved actual of 4 against a maximum
target of 6. In this quarter, the number of people delayed with AWI code recorded
remained at 3 in October and November and increased to 4 in December.
• At the end of Q3, the number of people delayed in hospital awaiting assessment (Codes
11A and 11B) was 5, which is 14% of census clients, against a target of 10.  The target
was based on the average for the previous four quarters of 23/24, which ranged from 9
to 11.   This is a noted reduction of 29% from FQ2 position which reported 7. 
Performance below target & areas for improvement: 
• The overall number of people delayed in hospital at Monthly Census Point as at the end
of Q3 was 35, against the target of 31. This reflects an increase of 13% compared to
FQ2 position (31). The target was set based on the average over the last four quarters
of 23/24, where client numbers ranged between 29 and 34.
• At the end of Q3 census point, the overall length of stay in a hospital (Delayed
Discharge Bed Days) at Monthly Census Point was 907 against the target of 634. This
represents an increase of 48% with 613 recorded in FQ2. The target was set based on
the average bed days over the past four quarters of 23/24, which ranged from 598 to
695.
• The number of people delayed awaiting a Care Home Placement was 10, compared to
a target of 4, 150% over the target. The actual number of people waiting has increased
by 900% (1 to 10) from FQ2 to FQ3. The target was set based on the average from the
previous four quarters of 23/24, which ranged from 0-5. 
•  At the end of FQ3, the number of people delayed in hospital awaiting care at home
availability was 15, representing 43% of census clients, compared to a target of 12. The
target was based on the average of the last four quarters of 23/24, which ranged from 8
to 14. This has decreased by 25% compared to FQ2 position (20). 
Page 45

Page 46

8 
4.2.9 Adult Social Care 
Performance across 4 Key Performance Indicators (KPIs) for Adult Social Care shows 3 KPIs (75%)
on track, with 1 KPI (25%) reported as off track against the targets set for FQ3 24/25.  Performance
on track reports an increase of 25% from the reported FQ2 24/25 position (50%). 
Performance on or above target: 
• Reduce the number of Unplanned Admissions to A&B hospitals directly from a care
home has remained steady at 16 in both FQ2 and FQ3, which is below the target of 36.
• Increasing the occupancy rates across A&B Care Homes has remained steady at 96%
across FQ1, FQ2 and FQ3 and 2024/25. This KPI is now measured against available
places (previously all empty beds).
• The FQ3 performance was looking to reduce the value of assessed unmet need for care
at home. FQ3 actual was £14,718.26, which is £1,960.78 (12%) below the target. 
Target is set at previous quarter’s value.  
Performance below target & areas for improvement:  
• Increasing the % of Older People who had their homecare monitoring review completed
within 6 months was noted at 40% for FQ3, against a target of 49%, which is 18% below
target.  Compared to FQ2, where the actual was 37%, this represents a 3% increase
(40%).  
4.2.10 Community Hospitals 
Performance across 5 Key Performance Indicators (KPIs) for Community Hospitals shows 4 KPIs
(80%) on track, with 1 KPI (20%) reported as off track against the targets set for FQ3 24/25. 
Performance on track has remained consistent, with an 80% track record across both FQ2 and
FQ3. 
Performance on or above target: 
• The average length of stay for inpatients in A&B Community Hospitals was reduced to
7.4 days across the quarter, against the target of 7.8 days. This represents a 4%
improvement compared to FQ2, where the average length of stay was 7.7 days. 
• A&E attendances meeting the 4 hrs wait target reached 95.1%, exceeding the 95%
target by 0.1%. This is a slight reduction of 2% from FQ2, where performance was noted
as 97.1%.  
• Maintain A&B Community Hospitals Bed occupancy rates below 80% target.  Bed
occupancy rates remained well below target at 70.6% for FQ3, marking a slight increase
of 1.3% from 69.3% in FQ2.    
• Reduce the number of falls being reported in a Community Hospital setting in A&B. In
FQ2, we reported 38 falls, well below the target of 54. This showed an increase of 1 fall
from FQ2 (3%). 
Performance below target & areas for improvement: 
• Reduce the rate of unplanned admissions to Community Hospitals for 65+ population.
This KPI reported 490 admissions, 8% above the target of 452 for FQ3. This represents
approximately 1% increase compared to FQ2. 
Page 46

Page 47

9 
4.2.11 Adults with Long Term Conditions / Adult Support & Protection / Alcohol Drugs
Partnership 
Performance across 8 Key Performance Indicators (KPIs) for Adults with Long Term Conditions
Services shows 3 KPIs (38%) on track, with 5 KPIs (62%) reported as off track against the targets
set for FQ3 24/25. There is no change from FQ2 24/25. 
It should be acknowledged that nationally waiting time breaches for New Mental Health Outpatients
(12 weeks) and Psychological Therapy (18 Weeks) are measured against a zero target. Local
targets have been set to monitor progress and improvements to reduce the number of patients on
waiting lists across varied health specialties 
Performance on or above target: 
• 10 Adults are on the dynamic support register with a category red or amber status, in
line with Q3 target of 10, and down from 12 reported in FQ2. 
• FQ3 noted 30 Adults waiting for a psychological therapy service against the target of
175 or fewer, and a reduction from 40 in the previous quarter. 
• 90.8% of individuals referred to Alcohol and Drug treatment services were seen within
the target waiting period, above the 90% target and an increase from 89.6% at FQ2.   
Performance below target & areas for improvement: 
• 12% of Adults with a Learning Disability were reported as overdue their annual review,
up from 7% in FQ2 and above the 3% target.
• 502 Adults were waiting for a Mental Health outpatient service, missing the target of 390
or less. And in increase of 13% from FQ2 position (446).
• FQ3 noted 30% of Adult Support and Protection 'duty to inquire' procedures were
completed within the 5 working day target, below 70% target and no change from FQ2.
• Only 30% of Adult Support and Protection inquiries requiring investigative powers were
completed within the 15 working day target (70%), down from 55% reported in FQ2.
• 79% of Case Conferences began within 20 days of referral or within 12 weeks of the
initial conference for review, an improvement on previous FQ2 (53%), but below the
100% target. 
4.2.12 Rural General Hospitals (Lorn & Island Hospital) 
Performance across 9 Key Performance Indicators (KPIs) for Rural General Hospitals (LIH) shows
4 KPIs (44%) on track, with 5 KPIs (56%) reported as off track against the targets set for FQ3 24/25.
 
Performance on track reports an 11% increase from the reported FQ2 position. 
Performance on or above target: 
• Reduce the rate of unplanned admissions to LIH 65+ population. FQ3 performance
noted the actual number of unplanned admissions was 322, down 16% from 383 in
FQ2, meeting the target set of 345.  
• Reduce the number of LIH A&E Attendances that result in an unplanned admission. The
FQ3 performance for reducing unplanned admission from A&E attendances was on
target with both actual and target 19.2%.  This is a decrease of approx. 1% from FQ2,
where the rate was 19.8% and off target. 
Page 47

Page 48

10 
• Reduce the number of falls being reported in a hospital setting in LIH. FQ3 performance
noted the actual number of falls was 26 against a target of 26. This reflects a 21%
reduction in falls from FQ2, where 33 Falls were reported. 
• Reduce the number of instances of tissue viability in Lorn & Islands Hospital. The target
was to reduce the number of tissue viability instances to no more than 4. FQ3
performance on actual instances was 2, a reduction of 4 (67%) reported in FQ2. 
Performance below target & areas for improvement: 
• Reduce the total number of unplanned bed days in LIH. The actual number of
unplanned bed days reported was 3327, 4 above the target of 3323, based on the 23/24
average.  This represents a 12% increase from FQ2 of 2969. 
• Reduce the Average Length of Stay for inpatients in LIH. FQ3 Performance noted we
achieved an actual rate of 5.3, against the target of 4.8. This is up 26% from 4.2 noted in
FQ2.  
• Maintain LIH Bed Occupancy Rates below 90% target. FQ3 performance noted an
actual rate of 92.4%, approx. 7% increase from 85.8% noted at FQ2. 
• Reduce the number of medication errors in LIH. The quarterly indicative target was set
at no more than 6 per reporting period, 6 based on 2023/24 average.  In FQ3 we noted
an actual of 12, an increase of 3 (33%) from FQ2.   
4.2.13 National Health & Wellbeing Outcome Indicators & Ministerial Steering Group
Integration Indicators 
The National Health and Wellbeing Outcomes provide a strategic framework for the planning and
delivery of health and social care services. This suite of outcomes serves to focus on improving the
experiences and quality of services for people using those services, carers, and their families. These
indicators form the basis of the annual reporting requirement for Health and Social Care
Partnerships across Scotland.   
The national indicators will be updated and reported within A&B HSCP’s Integrated Performance
Management Framework to provide the national performance position alongside the local service
Key Performance Indicators suite. 
The latest data in relation to 26 HWBOI and MSG Indicators reports 50% on track, with 13 on track
and 13 off track. An overview of A&B HSCP’s latest performance against the 26 measures is
reported in Appendix 1. It should be noted that reporting periods vary across the suite of national
indicator measures, with some measures reported quarterly affected by national reporting data lag. 
Page 48

Page 49

11 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The monitoring and reporting against Key Performance Indicators using the Integrated Performance
Management Framework and Dashboard ensures the HSCP can deliver against key strategic
priorities. This in-turn is aligned with the Strategic Plan and key objectives. 
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
Financial performance is evidenced within the IPMF Dashboard ensuring best value as well as
evidencing the impact and performance against organisational budget savings. 
6.2 Staff Governance
Key performance indicators within the IPMF ensure that staff governance requirements continue to
be progressed and developed include health and safety, wellbeing and new service redesign and
working practices. 
6.3 Care and Clinical Governance
Clinical Governance and patient safety remain at the core of prioritised service delivery against the  
new IPMF Dashboard and National Health & Wellbeing Outcomes Indicators. The new governance
structure supporting the IPMF ensures that the Clinical & Care Governance Committee remain
central to performance improvement. The development of the IPMF is focussed on moving away
from previous traditional styles of reporting to a fully collaborative approach with Head of Service
and Service Lead commentary. 
7. PROFESSIONAL ADVISORY 
Data used within the performance dashboard is fully accessible in SharePoint with data trends and
forecasting are identified to give wider strategic context. This provides the HSCP professional
advisors with self –service performance information to inform their role in maintaining professional
standards and outcomes. 
8. EQUALITY & DIVERSITY IMPLICATIONS
The Integrated Performance Management Framework captures relevant indicators used to inform
the HSCP E&D work.
8.1 PROTECTED CHARACTERISTICS
Performance detailed within this report acknowledges the rights of the Child (UNCRC), Islands.
Fairer Scotland, Socio-economic Duty, Equalities - protected characteristics.  
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Data use and sharing within this report and IPMF performance dashboard is covered within the
Argyll and Bute Council & NHS Highland Data Sharing Agreement 
10. RISK ASSESSMENT
Risks and mitigations associated with performance data sources and reporting are managed and
identified within the monthly Performance & Improvement Team- Work Plan. 
Page 49

Page 50

12 
10.1 STRATEGIC, OPERATIONAL OR CLIMATE RISK
Performance reports are used by operational management to identify service delivery risk and to
inform mitigation action accordingly.
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
Performance reporting is available for the public via Argyll and Bute Council and NHS Highland
websites. The IPMF dashboard utilises SharePoint to support manager and staff access across the
HSCP.
12. CONCLUSION 
The committee is asked to consider and acknowledge FQ3 2024/25 (July - September) performance
as detailed in the IPMF Dashboard. 
The committee should also note that the 2025-26 review of KPI’s has commenced.   
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required x
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if relevant)
Integration
Joint Board
Health & Social Care
Partnership -
Performance Report –
FQ3 2024/25   (October
– December)
26/03/2025 
Clinical and
Care
Governance
Committee
Health & Social Care
Partnership -
Performance Report –
FQ3 2024/25   (October
– December)
1/05/2025 
REPORT AUTHOR AND CONTACT 
Author Name: Douglas Hunter- Senior Manager Performance & Improvement
Email: douglas.hunter@argyll-bute.gov.uk 
Page 50

Page 51

13 
Appendix 1 – HWBOI & MSG Integration Indicators. 
Core Suite of Integration Indicators 
Data notes 67% (6 of 9) HWBOI Outcomes measures reporting as above the national Scotland Rate. It is worth noting that performance will be influenced and vary in line with the total number
of respondents participating in this voluntary survey. As such, caution should be noted with regards to previous comparison and trends 
Page 51

Page 52

14 
HWBOI - Performance 
Data notes 55.5% (5 of 9) HWBOI Performance measures reporting as above the national Scotland Rate. *Indicators 12, 13, 14, 15, 16, 18 Calendar year 2023 is used here as a proxy for 2023/24
due to the national data for 2023/24 being incomplete. This is in line with guidance issued by Public Health Scotland which was communicated to all Health and Social Care Partnerships. Using
more complete calendar year data for 2023 should improve the consistency of reporting between Health and Social Care Partnerships. 
Page 52

Page 53

15 
Ministerial Steering Group Integration Indicators 
Data notes 25% (2of 8) MSG Indicators reporting as above the national Scotland rate. MSG Indicators data notes that all MSG measures have increased in the last reporting year. Activity around
Emergency Admissions, Unplanned Bed Days, A&E attendances and Delayed Discharge Bed Days all noted performance exceeding pre –Covid levels. This highlights the necessity to consider
approaches to alleviate systems pressures around Urgent and Unscheduled Care and expedite hospital flow. 
Page 53

Page 54

16 
Appendix 2 - Delayed Discharge Sitrep – 6th January 2025 
Page 54

Page 55

ARGYLL AND BUTE COUNCIL       COMMUNITY SERVICES COMMITTEE
EDUCATION           5 JUNE 2025 
SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 – TOBERMORY 2-18
CAMPUS 
1.0      EXECUTIVE SUMMARY 
1.1 This report provides details of a draft Proposal to relocate the current Tobermory
2-18 Campus to a new purpose-built 2-18 campus school building in
accordance with the requirements of the Schools (Consultation) (Scotland) Act
2010. The Proposal Paper, attached as Appendix 1, provides details of the
background for the Proposal, the likely educational benefits and effects arising
from the Proposal, and outlines the proposed arrangements for a statutory
consultation exercise on the Proposal. 
1.2 The Proposal does not seek to incorporate the associated primary schools into
the new campus building, nor will it change the current leadership and
management structure within the 2-18 campus. it is proposed that the formal
consultation on the Proposal will be undertaken under the terms of the 2010 Act,
commencing on 18th August 2025 (with due written notice of the Proposal
issued to the relevant consultees listed in Appendix 1) and ending on 26th
September 2025.   In addition, it is proposed that a public meeting will be held
on Tuesday 9th September in Tobermory 2-18 Campus at 6pm. 
1.3 It is recommended that the Community Services Committee agrees to adopt the
draft Proposal (as set out in Appendix 1) as a “Relevant Proposal” that should
now proceed to a statutory consultation under the Schools (Consultation)
(Scotland) Act 2010, in accordance with the timeframe as set out in the draft
Proposal Paper. 
Page 55 Agenda Item 7

Page 56

ARGYLL AND BUTE COUNCIL       COMMUNITY SERVICES COMMITTEE 
EDUCATION                    5 JUNE 2025 
SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 – TOBERMORY 2-18
CAMPUS 
2.0 INTRODUCTION 
2.1 Under the Schools (Consultation) (Scotland) Act 2010, if a local authority
proposes to relocate a school, it must undertake a statutory consultation with the
“relevant consultees” affected by this proposal. In this instance,  
o Tobermory ELC  
o Tobermory Primary 
o Tobermory High    
and the following primary schools that are associated primaries: 
o Dervaig Primary School  
o Salen Primary Gaelic and English medium School and ELCs 
o Lochdonhead Primary School and 
o Ulva Primary School 
are the “affected schools” in terms of the 2010 Act.   
For the avoidance of any doubt, this proposal does not include the incorporation
of the associated primaries into the new campus building, nor will it change the
current leadership and management structure within the 2-18 campus.   
2.2 Any formal consultation exercise on the Proposal contained within the draft
Proposal Paper at Appendix 1 will proceed in terms of the requirements of the
2010 Act. The consultation period would commence on 18th August 2025 (with
due written notice of the Proposal issued to the relevant consultees under the
Act) and end on 26th September 2025. Written representations must be
received by the closing date in order to be taken into account.   
Page 56

Page 57

RECOMMENDATIONS 
3.1 It is recommended that Community Services Committee agree to adopt the draft
Proposal, as set out in Appendix 1, as a “Relevant Proposal” that is now to
proceed to a statutory consultation under the Schools (Consultation) (Scotland)
Act 2010, in accordance with the timeframe as set out with the draft Proposal
Paper. 
4.0 DETAIL 
4.1 Tobermory 2-18 Campus is a co-educational, non-denominational school
serving the town of Tobermory along with the surrounding area.  The school is
situated in The Manse Erray Road, in Tobermory. Tobermory Campus is an all-
through school with children and young people aged 2-18 years. The campus
consists of an early learning and childcare (ELC) provision, a primary and a high
school 
4.2 Given the current Tobermory Campus is assessed to be ‘C - poor’ in terms of
suitability there is a requirement to improve the situation. This is currently the only
school building in Argyll and Bute with that suitability rating.  The lower grading of
the Tobermory Campus building is largely driven by accessibility, restrictive drop
off space, lack of social spaces and restricted specialised classes. 
4.3  This Proposal is being advanced because Tobermory 2-18 Campus currently
suffers from poor quality accommodation. Relocating the school would permit the
construction of a new purpose-built campus and considerably improved
Education accommodation.  The opportunity to build a new building has arisen
from the successful application for funding from the Scottish Government’s
Learning Estate Investment Programme (LEIP). 
4.4 The draft Proposal Paper (Appendix 1) suggests relocating the current
Tobermory 2-18 Campus school building to a new purpose-built campus on a new
site in Tobermory. 
4.5  A Proposal to relocate a school is a “Relevant Proposal” in terms of Schedule 1
to the 2010 Act, and as such, is subject to a statutory consultation process. 
4.6  If such a process is commenced, the Education Service will give notice of the
Proposal to the relevant consultees and invite representations on the Proposal.
Details of the consultation exercise will also be published on the Council’s website
for access by the wider public. During the consultation period, the Education
Service will also hold a public meeting to discuss the proposal and involve
Education Scotland in the consultation process. Full details of the consultation
process are set out within the draft Proposal Paper (Appendix 1). 
Page 57

Page 58

5.0 CONCLUSION
5.1 Attached to this report is a draft Proposal Paper in respect of relocating the
current Tobermory 2-18 Campus school building to a new purpose-built
campus.   
6.0 IMPLICATIONS
6.1 Policy - If this draft Proposal is adopted, it will result in a statutory consultation
exercise on the same. At the conclusion of the statutory consultation,
the Proposal will be reviewed, and a Consultation Report will be
presented to a future meeting of the Committee where a decision will
be made by the Committee on whether or not to implement the
proposal. 
6.2 Financial – The cost of building the new campus is estimated at £43 million. 
6.3  Legal - Any relevant proposal requires to be considered by way of a
statutory consultation, carried out in accordance with the 2010 Act,
prior to being implemented. 
6.4  HR - none 
6.5  Fairer Scotland Duty - none at present 
6.5.1   Equalities - protected characteristics – will be examined in the context of the
Council’s Integrated Impact Assessments toolkit. If a statutory
consultation exercise is agreed, officers will conduct an Equalities and
Socio-Economic Impact Assessment as part of the Integrated Impact
Assessment on the consultation exercise, which would be incorporated
into the Service’s final Consultation Report, to be presented to
Committee at a later date. 
6.5.2   Socio-economic Duty - will be examined in the context of the Council’s
Integrated Impact Assessments toolkit. If a statutory consultation
exercise is agreed, officers will conduct an Equalities and Socio-
Economic Impact Assessment as part of the Integrated Impact
Assessment on the consultation exercise, which would be incorporated
into the Service’s final Consultation Report, to be presented to
Committee at a later date. 
6.5.3 Islands - will be examined in the context of the Council’s Integrated Impact
Assessments toolkit. If a statutory consultation exercise is agreed,
officers will conduct an Islands Impact Assessment as part of the
Integrated Impact Assessment on the consultation exercise, which
Page 58

Page 59

would be incorporated into the Service’s final Consultation Report, to
Committee at a later date. 
6.6 Climate Change - none  
6.7 Risk – none at present 
6.8  Customer Service – none at present 
6.9 The Rights of the Child (UNCRC) – will be examined in the context of the
Council’s Integrated Impact Assessments toolkit. If a statutory
consultation exercise is agreed, officers will conduct a Children’s Rights
and Wellbeing Assessment as part of the Integrated Impact
Assessment on the consultation exercise, which would be incorporated
into the Service’s final Consultation Report, to Committee at a later
date. 
Douglas Hendry - Executive Director with responsibility for Education
Councillor Audrey Forrest – Policy Lead for Education 
14th May 2025                                                  
For further information contact: 
Wendy Brownlie – Head of Education: Performance and Improvement
Louise Lawson – Education Officer – Education and community Engagement LEIP 
APPENDICES
Appendix 1 – Proposal Paper  
Page 59

Page 60

This page is intentionally left blank

Page 61

APPENDIX 1   
Education Service
PROPOSAL PAPER 
We are looking for your views on a Proposal to
relocate the 
Tobermory 2-18 Campus 
Closing date for written responses: 
26th September 2025 
A public meeting will be held on: 
09-09-25 in Tobermory 2-18 Campus at 6.00pm 
This document has been issued by Argyll and Bute Council for consultation under the
terms of the Schools (Consultation) (Scotland) Act 2010. 
If you need this information in another language or format, please contact us to
discuss how we can best meet your needs. 
Phone: 01369 708576
Email: argyllhousereception@argyll-bute.gov.uk 
Page 61

Page 62

APPENDIX 1   
CONTENTS 
1. The Proposal and Consultation Process
2. Implementation Date for the Proposal
3. Background
4. Educational Benefits Statement
5. Assessing the impact on the local community affected by this Proposal 
6. Employee Implications
7. Conclusion 
8. Responding to the consultation 
Appendices:
Appendix 1  Distribution List
Appendix 2 Map of the location of the new campus
Appendix 3  Map of the Tobermory South site
Appendix 4  Map of Catchment Area
Appendix 5  School Roll Data
Appendix 6 Consultation Response Form 
Page 62

Page 63

APPENDIX 1   
1.0 THE PROPOSAL AND CONSULTATION PROCESS 
1.1      The Proposal being consulted on is as follows: 
To relocate the current Tobermory 2-18 Campus to a new purpose-built 2-18 
campus school building.  The Proposal, if approved, will be implemented when 
the new accommodation has been completed. 
1.2      Decision to Undertake the Consultation 
This Proposal is being advanced because Tobermory 2-18 Campus currently
suffers from poor quality accommodation. Relocating the school would permit the
construction of a new purpose-built campus building and considerably improved
Education accommodation.  The opportunity to build a new campus has arisen
from the successful application for funding from the Scottish Government’s
Learning Estate Investment Programme (LEIP). 
1.3     Consultation on the Proposal 
Under the Schools (Consultation) (Scotland) Act 2010 (the 2010 Act), if a local
authority proposes to relocate a school, it must undertake a statutory consultation
with the ‘relevant consultees’ affected by the Proposal. In this instance, located
within the current campus:
• Tobermory ELC 
• Tobermory Primary
• Tobermory High 
and the following primary schools that are associated primaries: 
• Dervaig Primary School 
• Salen Primary Gaelic and English medium School and ELCs
• Lochdonhead Primary School and
• Ulva Primary School 
are the “affected schools” in terms of the 2010 Act. 
For the avoidance of any doubt, this proposal does not include the incorporation
of the associated primaries into the new campus building, nor will it change the
current leadership and management structure within the 2-18 campus. 
The formal consultation on the Proposal within this document will be undertaken
under the terms of the 2010 Act. The consultation period will start on 18th August
2025 (with due written notice of the Proposal issued to the relevant consultees
listed in Appendix 1) and end on 26th September 2025. Written representations
must be received by the close of business on the closing date in order to be taken
into account.
At the outset of the consultation period, the Council will also publish details of the
consultation exercise, including a copy of this Proposal Paper, on the Council’s
Page 63

Page 64

APPENDIX 1   
website for the wider public to access the consultation materials and submit
responses. 
1.4     Public Meeting 
A public meeting will be held on Tuesday 9th  September 2025 at 6pm in Tobermory
2-18 Campus to discuss the Proposal. Anyone wishing to attend the public meeting
is invited to do so. The meeting will provide those in attendance with an opportunity
to: 
• Hear about the Proposal;
• Ask questions about the Proposal, and
• Express views about the Proposal. 
A note will be taken of any views expressed and/or questions asked at the public
meeting so that they can be taken into account as part of the consultation process.
A representative from Education Scotland will attend the public meeting as an
observer.    In addition to the public meeting, written representations will be able
to be made during the consultation period. A copy of the Consultation Response
Form can be found at Appendix 6. 
1.5      Pupil Views 
Pupils deemed to be of appropriate age and maturity at the affected schools will
be invited to comment during the consultation process, through sessions facilitated
by a Council Officer, ensuring that they have an opportunity to contribute their
views. 
1.6      Education Scotland (HM Inspectorate of Education, HMIe) 
At the start of the consultation period, the Council will provide Education Scotland
with this Proposal Paper. When the consultation period has ended, the Council will
collate all of the written and oral representations. Thereafter, this information will
be provided to Education Scotland and include; 
• A copy of written representations made to the Council on the Proposal
(or summary of them if agreed with Education Scotland),
• A summary of oral representations made at the public meeting, and
• Other relevant documentation, so far as is practicable. 
Education Scotland will prepare a report on the educational aspects of the
Proposal taking account of the above, and insofar that Education Scotland
considers them relevant, any written representations made directly to them.
Education Scotland may also visit the schools affected by the Proposal and make
any other enquiries as they consider appropriate. Education Scotland require to
send their report to the Council no later than three weeks (or longer if agreed with
the Council) after having received the information from the Council. 
Page 64

Page 65

APPENDIX 1   
1.7     Consultation Report  
After receiving Education Scotland’s report, the Council will review the Proposal
taking account of written representations received during the consultation period,
oral representations made during the public meeting and Education Scotland’s
report. The Council will then prepare and publish a Consultation Report, which
will include a recommendation regarding implementation of the Proposal and
make it available for inspection. The Consultation Report will be published no
later than three weeks before it is formally considered by the Council’s
Community Services Committee. 
1.8      Inaccuracies or Omissions 
Where any inaccuracies or omissions are discovered within this Proposal Paper,
the Council will determine whether relevant information has been omitted or, if
there has been an inaccuracy. Appropriate action will then be taken by the
Council, which may include issuing corrections, re-issuing a corrected Proposal
Paper or an extension of the consultation period. In any of these events, all of
the Relevant Consultees (and where applicable the notifier(s) of any omissions
or inaccuracies) and Education Scotland will be advised of the action that is
taken. 
1.9      Integrated Impact Assessment 
The Council is required to carry out impact assessments in relation to certain
policy and service changes to ensure it considers how those changes may impact
different groups, in accordance with the Council's statutory duties relating to
equalities, inequalities of opportunity, children’s rights and wellbeing, consumers
and island communities. 
The statutory consultation exercise will enable officers to consult with the above-
mentioned groups and gather evidence pertaining to potential impacts of the
Proposal. Those impacts will be assessed by officers on an ongoing basis and
an Integrated Impact Assessment will be published alongside the Council’s
Consultation Report. 
2.0  IMPLEMENTATION DATE FOR THE PROPOSAL 
2.1  The proposal, if accepted, would be implemented when the building works for the
new school campus have been completed. Officers currently anticipate that in
accordance with the current project plan this will be from early 2029.  This is an
estimate, is dependent on a number of milestones set out in the current project
plan and therefore may be subject to change. 
3.0  BACKGROUND 
3.1 Tobermory 2-18 Campus is a co-educational, non-denominational school serving
the town of Tobermory along with the surrounding area.  The school is situated
in The Manse Erray Road, in Tobermory. Tobermory Campus is an all-through
school with children and young people aged 2 – 18 years. The campus consists
Page 65

Page 66

APPENDIX 1   
of an early learning and childcare (ELC) provision, a primary and a high school.
The campus has three different buildings associated with it along with a Pre5
unit.  The original block B was built circa 1930s with Block F being added in the
1970s.  The Art block was then added between 1980/1990 and the Pre5 unit built
in 2010.   
The ELC setting provides flexible placements for 38 weeks of the year during
term time.  Children and young people attending ELC and Primary are usually,
but not exclusively, based in Tobermory while the Secondary School serves
North and Central Mull, with associated primary schools of Dervaig,
Lochdonhead, Salen and Ulva Ferry. 
There are also children and young people attending secondary on placing
requests (from Highland Council and from the South of the island). Children and
young people benefit from Gaelic Learner Education delivered across the school
and Literacy and Gàidhlig in the secondary stages. The catchment areas for the
primary and secondary are shown in Appendix 4. 
The school roll, at 13-05-25, is shown as per the table below.   
Primary P1 P2 P3 P4 P5 P6 P7 Grand
Total
11 10 17 8 6 16 12 80
Secondary S1 S2 S3 S4 S5 S6  Grand
Total 
25 21 36 30 29 13  154 
ELC total  19 
3.2 Given current Tobermory Campus is assessed to be ‘C - poor’ in terms of
suitability there is a requirement to improve the situation. This is currently the
only school building in Argyll and Bute with that suitability rating.  The lower
grading of Tobermory Campus building is largely driven by accessibility,
restrictive drop off space, lack of social spaces and restricted specialised
classes. The building currently sits at 41.91% incline with little scope to improve
this. Analysis of the council expenditure on the campus also highlights a trend of
increasing reactive or maintenance spend and a sizable sum of investment on
addressing degrading fabric at the school over the past five years. Roof works,
water ingress and building fabric repairs are common sources of expenditure. 
The condition of the building can be improved from further investment; however,
the suitability is much more challenging to be upgraded without significant
refurbishment.  Such year-on-year construction can be detrimental on both pupils
and staff over long periods of time, and/or would require decanting of operations
for periods.  Other environmental (climate change) standards or digital
enhancements also remain below the minimum standard compared to a new
build LEIP school.   
3.3 In December 2021 the Cabinet Secretary for Education and Skills outlined to the
Scottish Parliament that LEIP Phase 3 would seek projects within 12 months. 
Page 66

Page 67

APPENDIX 1   
The project team worked on developing the application adhering to the detailed
requirements set out by the Scottish Government:
• Local investment priorities and their context within the ‘Place’
• The proposed Vision, Strategic Outcomes and Objectives for the project(s)
• Alignment with Learning Estate Strategy 2019 Guiding Principles
• Ensuring political and financial commitments are in place for the investment
priorities
• Demonstrating implementation of the terms and conditions of the programme on
Phase 1&2 projects (where applicable). 
The Council submitted a bid for Scottish Government LEIP funding in October 
2022 for a 2-18 campus on Mull. In October 2023, the bid was accepted. The 
bid met the LEIP eligibility criterion on the condition that funding would be 
provided on a “like for like” basis to replace the existing Tobermory campus. 
3.4  The Council, in April 2024, decided to commence the Business Case, 
undertake engagement exercises and commence the site selection process. 
3.5 In August 2024, the council issued an open call for sites for the new campus to 
identify potentially suitable sites. The council carried out an extensive 
community engagement exercise in September 2024 to ask the community 
what was important to them when considering a site for the new campus. 
Councillors considered the findings in December 2024:
Read the Community Engagement Analysis Report. 
On 20th December 2024, the Council confirmed that the new Campus would 
continue on a single-site basis.
A detailed site appraisal was carried out with the output presented to the 
council in early March 2025. This process included an Integrated Impact 
Assessment and views were sought from community groups to inform this to 
supplement the engagement analysis report. 
3.6  On 7th March 2025 the preferred site was confirmed at the Special Council 
Committee Meeting as ‘Tobermory South’. The site is situated to the southern 
edge  of Tobermory with the western boundary adjacent to the A848. This is 
illustrated in relation to the existing campus on the map in Appendix 2.   
Councillors made this decision based on evidence presented through a 
comprehensive preferred site recommendation report with a large suite of 
appendices, the culmination of six months of activity. The meeting minutes and 
report is available on this link: 
Agenda for Argyll and Bute Council on Friday, 7 March 2025, 1:00 pm - Argyll
and Bute Council
3.7  Following the decision on the preferred site, as Tobermory South, by  
councillors, it is now appropriate to formally consider this statutory relocation
Proposal in parallel with the development of the outline business case.
Page 67

Page 68

APPENDIX 1   
3.8 The new building will include the appropriate number of learning   
spaces, modern practical subject specific rooms, a larger gym hall and a larger 
dining  hall. The outdoor environment will be accessible and suitable for 
outdoor learning. 
More information about the Campus is available on the council website. 
4.0 EDUCATIONAL BENEFITS STATEMENT – ASSESSMENT OF THE LIKELY
EFFECTS OF THE PROPOSAL 
4.1  Benefits for Present Pupils at Tobermory Campus 
Should the school be relocated and built on the new site, there will be benefits
for current pupils. A new purpose-built campus will be a significant, more efficient
improvement on the current establishment. These improvements include better-
quality accommodation, more attractive learning environment, access to modern
technology, improved disability access and improved indoor and outdoor learning
environment.  The Education Service also have confidence that the new building
will provide excellent facilities for use outwith school hours that could be used to
help meet the learning, leisure and social needs of the children and young people
and the community. 
The design of the new campus will ensure that accessibility for all, including
learners with disabilities complies with the Council’s Accessibility Strategy and
the Equality Act 2010.  It will be designed in such a way as to promote accessible
and inclusive learning which will meet the needs of learners including those with
Additional Support Needs. It will be designed to be an inspiring learning
environment which is fully able to support new and innovative digital learning and
engage pupils with the curriculum. 
4.2  Benefits for Future Pupils of Tobermory Campus 
The development of a new campus in Tobermory will see children and young
people benefit from a well-resourced single site which retains capacity to meet
future educational needs as they arise. A new purpose-built campus offers the
prospect of strong educational benefit arising from improved accommodation and
learning environment for the pupils.  A degree of flexibility and adaptability will be
built into the design in order to provide options to alter spaces in the future in
response to the changing needs of the campus population. This approach is likely
to optimise the use of available space. 
The new campus will include new sports facilities which will significantly enhance
opportunities for Physical Education and related activities. Pupils will have the
opportunity to make links within and across disciplines through interdisciplinary
learning adding depth and relevance to experiences. It would be expected that
these improvements in facilities and the associated impact on practices would
have a positive impact on the Health and Wellbeing of children and young people. 
Page 68

Page 69

APPENDIX 1   
The new campus will be fully responsive to future learning requirements and the
design process will ensure that all spaces support learning and teaching relevant
to the society pupils will enter as adults.  It will be designed to be an inspiring
learning environment which is fully able to support new and innovative digital
learning and engage pupils with the curriculum and allow them to develop skills
for lifelong learning. 
Facilities such as a science laboratory, technology workshop, home economics
room, music suite, and library will support and enhance learning as well as
supporting transitions. These facilities will also benefit pupils who access
mainstream/enhanced provision learning arrangements across the wider
campus.  With carefully considered timetabling, the whole campus would have
access to the facilities. 
Outdoor Learning provision will also be improved for all learners and will be at
the heart of the design process. This will provide enhanced opportunities for
learning beyond the classroom for all learners. As part of the design for the
outdoor environment consideration will be given to ensure safe pick up and drop
off points for pupils arriving by a variety of transport modes and suitable parking
facilities for staff and visitors. This should include a safe walking route and will
allow better management of any risks in and around the vehicle and pedestrian
interface.  Appropriate use of CCTV will help manage / reduce unauthorised
entry, bullying and vandalism and can also help pupils feel more secure. 
The digital learning environment would be enhanced through these proposals.
Staff knowledge and skills in using digital platforms for learning and teaching will
be more effectively shared among colleagues, and teachers across the campus
and across the authority will work collaboratively to build online learning
experiences and resources.  Such improvements in provision would be
underpinned by the advanced digital facilities and accessibility planned into the
design of the school. 
4.3  Effects on Other Users of the School’s Facilities 
In line with Argyll and Bute’s Learning Estate Strategy and in accordance with
the Scottish Government Learning Estate Investment Programme (LEIP)
requirements the use of the new building should benefit the wider community.
This ensures high quality partnership working and community engagement is at
the heart of the Education Service.  For the new campus this would involve
planned use of the library and sports facilities and the opportunity to book
rooms, at appropriate times, by other users in the community.  The new
campus may also have the benefit of attracting and retaining staff as they could
be drawn to the first-class working environment at the new campus. 
4.4  Effects on Pupils of Tobermory Campus 
As the new campus will be located a short distance from the current site, there is
not expected to be any significant effect on school transport arrangements for
pupils.
Page 69

Page 70

APPENDIX 1   
Key aspects that will improve the environment for pupils will be considered during
the design phase. These include acoustics and noise, air quality, lighting,
temperature control and classroom size. The improved physical environment is
likely to impact positively on attendance   as pupils will find the new environment
a nicer place to be. In addition to this, improved physical spaces can result in a
physically and mentally healthier environment leading to less time off for illness. 
In addition to enhancements to the physical environment, improvements to the
layout of the teaching areas and classrooms will encourage high levels of
collaborative and collegiate work among the educational staff, positively
impacting on levels of attainment and achievement. Opportunities for inclusive
and collaborative learning (where appropriate) through access to flexible learning
spaces can further promote positive attitudes to diversity.  The flexible learning
spaces will facilitate working across school stages, allowing varied and enhanced
social interactions and provide opportunities for pupils to experience quiet spaces
when required, which positively impacts on emotional wellbeing. Strengths
across the school will be shared. Existing good practice will be recognised and
identified within the school and incorporated into strategic planning to improve
provision and ensure equity of experience for young people across the school. 
4.5 Implications for Pupils if the Proposal was not Implemented 
The Council’s Learning Estate Strategy 2021 sets out an ambition to provide a
school estate that is of category A or B in terms of suitability and condition plus
a number of other modern standards.  Delivering a new campus in Tobermory
supports that ambition, because Tobermory 2-18 campus currently has poor
suitability/condition accommodation as outlined in the school condition survey for
the campus. Relocating the campus would permit the construction of a purpose-
built campus. 
Whilst there have been ongoing maintenance and improvement works, the
current school is not suitable in its condition or layout as a 2-18 campus, as
according to Argyll and Bute’s Learning Estate Strategy, learning environments
in all schools should have a suitability grading of A or B. The current grading of
the campus is “C” which means the physical element of the campus does not
carry out its function effectively without continuous repair and it shows
considerable signs of age. There are significant issues with accessibility due to
the multiple sets of stairs and changes in level throughout the campus and narrow
corridors. 
If this proposal is not implemented, this is likely to have a negative effect on
student perception, comfort and well-being whilst learning within the building. In
addition to this, students or staff with limited mobility will struggle to access all of
the current school. There have in recent years been representations from senior
pupils asking for improvements.   As an older school building, the ongoing
maintenance required to keep the campus in a useable condition can be
disruptive to learning and routines.  Classroom environments can be noisy as
they are not designed for modern teaching methods.  Another consideration is
that classrooms can often be too hot or too cold, with no real way to regulate the
Page 70

Page 71

APPENDIX 1   
temperature at a consistently comfortable level. In addition to this there are
challenges with the external environment, this is evident through insufficient
parking and a tight road infrastructure serving the current site.  This affects bus
drop off and pick up points and active travel routes for the current site. 
5.0 ASSESSING THE IMPACT ON THE LOCAL COMMUNITY AFFECTED BY
THIS PROPOSAL 
5.1 With the construction of the new purpose-built campus, we anticipate potential
benefits for the local communities of the affected schools.  These include the
current ELC, primary and secondary sectors of the campus as well as the
associated primary schools of Dervaig, Lochdonhead, Salen, and Ulva Ferry. 
Schools influence the attractiveness of an area for potential residents and, in
turn, the value of future housing developments. A new campus in Tobermory
may have potential to contribute towards an increase in the value of properties
in the area, as well as making it more attractive for families with children to
move to the area.  This may also apply to the local areas that are in the
catchment area for Tobermory secondary.  Community members will benefit
from opportunities to access the new sports facilities and library in evenings
and weekends at the new campus. 
6.0 EMPLOYEE IMPLICATIONS 
6.1 Staffing arrangements will continue to be consistent with the Argyll and Bute
Council Staffing Standards and other local arrangements. For the avoidance of
any doubt, this proposal does not include the incorporation of the associated
primaries into the new campus building, nor will it change the current leadership
and management structure within the 2-18 campus. 
6.2 Key aspects that will improve the environment for staff will be considered during
the design phase. These include acoustics and noise, air quality, lighting,
temperature control and classroom size. Improved physical spaces can result in
a physically and mentally healthier environment leading to less time off for illness.
Improved accessibility will make the building suitable for anyone experiencing
mobility issues.  The new campus’s enhanced digital technology capabilities will
empower staff to design and deliver modern lessons while fully integrating digital
tools across the curriculum. 
7.0 CONCLUSION 
7.1  This is a Proposal to relocate Tobermory 2-18 Campus. The matter is being
considered by way of a statutory consultation exercise in accordance with the
2010 Act. 
8.0     RESPONDING TO THE CONSULTATION 
8.1     Interested parties are invited to respond to the consultation exercise by making
written submissions on the Proposal, using the form at Appendix 6, by no later
than close of business on 26th September 2025. 
Page 71

Page 72

APPENDIX 1   
Responses can be posted to: 
Argyll and Bute Council
Customer Services: Education
Argyll House
Alexandra Parade
Dunoon, PA23 8AJ 
Or emailed to:  argyllhousereception@argyll-bute.gov.uk 
8.2 Those submitting a response, whether by letter or email, should be aware that 
their response will be published as part of the Council’s final Consultation 
Report. 
8.3 If they do not wish their response to be publicly available, they should clearly 
indicate on the document by ticking the box which states: “I wish my response 
to be considered as confidential with access restricted to elected members and 
officers of Argyll and Bute Council.” Otherwise, it will be assumed that the 
respondent agrees to their response being made publicly available 
Page 72

Page 73

APPENDIX 1   
Appendix 1 – Distribution List 
Distribution list and how to access a copy of the Proposal Paper 
A Summary of this Proposal (including details of where/how to access the full
Proposal Paper) will be provided to the following ‘Relevant Consultees’ in terms
of the Act: 
• The Parent Councils of Tobermory 2-18 Campus
• The Parent Councils of Dervaig, Salen, Lochdonhead and Ulva Primary
Schools
• The parents of pupils at all affected schools
• The parents of any children expected to attend any of the affected schools
within two years of the date of publication of this Proposal Paper
• The pupils at the affected schools (in so far as the Education Authority
considers them to be of suitable age and maturity)
• The pupils at the associated primary schools – Dervaig, Salen, Lochdonhead
and Ulva Primary Schools (in so far as the Education Authority considers them
to be of suitable age and maturity)
• All employees at the affected schools
• Trade union representatives of employees at the affected schools
• Mull Community Council
• All relevant users of the Tobermory 2-18 Campus
• Argyll and Bute Community Planning Partnership 
A Summary of this Proposal (including details of where/how to access the full
Proposal Paper) will also be made available to: 
• Argyll and Bute Councillors for Ward 4 – Oban South and the Isles
• The constituency MSP for Argyll and Bute
• List MSPs for the Highlands and Islands region
• The constituency MP for Argyll, Bute and South Lochaber
• Mull and Iona Community Trust 
The steps listed below have also been taken to ensure that the proposal is
widely available: 
• This Proposal Paper will be published on the Argyll and Bute Council website
• This document can be made available in alternative forms or translated by
contacting Argyll House, Dunoon, telephone: 01369 708576 or
argyllhousereception@argyll-bute.gov.uk; 
• Hard copies of this Proposal Paper will also be available for inspection, free of
charge, at the following locations:
a) Council Headquarters – Kilmory, Lochgilphead
b) Tobermory 2-18 Campus 
Page 73

Page 74

APPENDIX 1   
Appendix 2 – Map of location of the new campus site 
Site 1 - existing Tobermory 2-18 campus.
Site 4 – proposed new site for the campus. 
Page 74

Page 75

APPENDIX 1   
Appendix 3 – Potential Site Layout of the South Tobermory site 
Page 75

Page 76

APPENDIX 1   
Appendix 4 Catchment areas 
Page 76

Page 77

APPENDIX 1   
Appendix 5 – Tobermory 2-18 School Roll Data 
ELC Primary Secondary 
Roll  School Roll  School Roll  
2014-15    61 139 
2015-16  17 59 139 
2016-17  17 63 144 
2017-18  21 58 143 
2018-19  24 61 126 
2019-20  17 62 132 
2020-21  16 62 136 
2021-22  26 68 138 
2022-23  18 76 160 
2023-24  15 73 151 
2024-25 19 80 154 
* Historical roll figures taken from Census of each year
* Current school session figure accurate as of 13-05-25   
ELC Primary Secondary 
Roll  School Roll  School Roll  
2025-26 14 76 160 
2026-27 15 68 158 
2027-28 15 69 154 
2028-29 15 74 155 
2029-30 15 64 166 
2030-31 15 65 174 
*NHS provide birth data up to Jan 2025 - all projections after this is based on
averages 
*ELC projections based on NRS data with calculation to differences in actual starts each session. 
Page 77

Page 78

APPENDIX 1   
Appendix 6 – Response Form
CONSULTATION RESPONSE FORM 
Education Service 
Please use this form to let us know what you think about the proposal
You can complete this feedback form in Adobe Acrobat and print it out, or print and
complete it by hand, using block capital letters. Return the form to: Customer Services
Education, Argyll House, Alexandra Parade, Dunoon, PA23 8AJ
Or as an e-mail to argyllhousereception@argyll-bute.gov.uk. 
The closing date for responses to be received by the Council is 5pm on 26th
September 2025. 
Proposal 
Argyll and Bute Council is seeking the views on the following proposal, namely: 
• To relocate the current Tobermory 2-18 Campus School building to a new
school building located on the site which is situated to southern edge of
Tobermory with the western boundary adjacent to the A848. 
If you do not wish your response to be publicly available, you must tick the box
below. Otherwise, it will be assumed that you agree to your response being made
publicly available. 
“I wish my response to be considered as confidential with access restricted
to elected members and council officers of Argyll and Bute Council.” 
Name 
Address 
I agree with the proposal (please tick) Yes  No  Undecided 
If you wish to comment on the proposal please use the space below, or attach
another sheet 
Page 78

Page 79

APPENDIX 1   
I am responding in my capacity as a (please indicate by ticking the appropriate
box) 
Parent/ carer of child at  
Tobermory ELC/Primary
/Secondary 
Trade Union 
Parent/ carer of child at 
affected primary school (Dervaig,
Lochdonhead, Salen, Ulva Primary
School) 
Elected representative 
Pupil  Community Council 
Tobermory PS / Tobermory HS
Parent Council 
Member of the public/ community 
Dervaig, Lochdonhead, Salen,
Ulva Parent Council 
Member of staff 
Other  Details: _________________________ 
Handling your response - Please note that:
• We will use the information you provide for the purpose(s) of this consultation,
including statistical and analytical purposes;
• We will pass a full copy of your written response to Education Scotland or a
summary of it of agreed with them; and
• We are subject to the provisions of the Freedom of Information (Scotland) Act
2002 and therefore would have to consider any request made under that Act for
information relating to written responses/ records of oral representations made
to us relating to this consultation.
This consultation, and all other consultation exercises, can be viewed online on the
consultation web pages of the Council website at:
Consultations | Argyll and Bute Council
Thank you for taking time to respond.
Page 79

Page 80

This page is intentionally left blank

Page 81

ARGYLL AND BUTE COUNCIL                      COMMUNITY SERVICES COMMITTEE 
EDUCATION                  5 JUNE 2025 
EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides details of all external education establishment inspection
reports received across Argyll and Bute Education Service during the period
March 2025 to June 2025. 
1.2  It is recommended that the Community Services Committee notes:
a) The contents of this report; 
b) This quarterly report will be presented on an ongoing basis to the
Community Services Committee detailing all establishment inspections
conducted and published by Education Scotland within that period, and 
c) That Ward members will receive copies of school inspection reports for
schools within their area as published by Education Scotland. 
Page 81 Agenda Item 8

Page 82

ARGYLL AND BUTE COUNCIL                      COMMUNITY SERVICES COMMITTEE 
EDUCATION                   5 JUNE 2025 
EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
2.0 INTRODUCTION 
2.1 This report provides details of all external education establishment inspection
reports received across Argyll and Bute Education Service during March 2025 to
June 2025. 
2.2 As required for the National Improvement Framework, HMIE report on and
provide grades for the following Quality Indicators (QIs) as part of full model
inspections (which typically take place over a full school week): 
QI 1.3 – leadership of change;
QI 2.3 – learning, teaching and assessment; 
QI 3.1 – ensuring wellbeing, equality and inclusion; and 
QI 3.2 – raising attainment and achievement 
In addition, they include a focus on the following themes from other QIs: 
QI 2.2 curriculum: learning pathways 
QI 2.7 partnerships: parental engagement 
2.3 Short model inspections (typically over two and a half days) focus on two
QIs: 
QI 2.3 – learning, teaching and assessment; and 
QI 3.2 – raising attainment and achievement   
HMIE continue to have a focus on safeguarding in every inspection. An
inspection advice note issued in January 2024 advised that Inspectors
intended to strengthen the evidence they gather about relationships and
behaviour in schools and settings during inspections notified from week
beginning 15 January 2024. This evidence is being gathered in a range of
ways, including through an updated child protection and safeguarding
evaluation form. In addition to the inspection advice note, schools have
been provided with supporting local authority guidance. 
Page 82

Page 83

2.4 In inspections of early learning and childcare settings, HMIE use the
equivalent QIs from ‘How Good Is Our Early Learning and Childcare?’ 
3.0 RECOMMENDATIONS 
3.1  It is recommended that the Community Services Committee notes: 
a) The contents of this report; 
b) This quarterly report will be presented on an ongoing basis to the Community
Services Committee detailing all establishment inspections conducted and
published by Education Scotland within that period, and 
c) That Ward members will receive copies of school inspection reports for
schools within their area as published by Education Scotland. 
4.0  DETAIL – School Inspections 
4.1 Tarbert 2-18 was inspected the week beginning 24th February 2025 using the
full model of inspection. The school received positive feedback from the
Managing Inspector with specific reference to: Staff have worked well to
ensure relationships in the school are positive. Children and young people are
articulate, respectful and proud of their school. They learn in a welcoming and
calm environment. Staff are working together well to improve the quality of
learning, teaching and assessment through their participation in professional
learning. Children are making positive progress in developing their skills in
writing and numeracy in the primary department. 
The published letter and Summary of Inspection Findings (SIF) are available
on Education Scotland’s Website using the following link. HMIe inspectors will
return to conduct a further visit within one year of the publication date. 
Tarbert Academy | Inspection Report | Education Scotland 
4.2 Rothesay Joint Campus was inspected the week beginning 10th March 2025
using the full model of inspection. 
The link to the published letter and Summary of Inspection Findings (SIF) will
be accessible when these documents have been finalised and are available on
Education Scotland’s Website. 
4.3 North Bute Primary was inspected the week beginning 10th March 2025 using
the short model of inspection. The school received positive feedback from the
Managing Inspector with specific reference to: Children are polite and happy.
They are proud of their school and have a positive attitude to learning. Staff
Page 83

Page 84

support children to feel welcomed, cared for and safe in school. Children
experience respectful and nurturing relationships. Staff work effectively with
their partners to support children’s learning across a range of contexts.
Children learn in a variety of environments in the local area. 
The published letter and Summary of Inspection Findings (SIF) are available on
Education Scotland’s Website using the following link: 
North Bute Primary School | Inspection Report | Education Scotland 
4.4 Salen Primary and ELC was inspected the week beginning 24th March 2025
using the full model of inspection. 
The link to the published letter and Summary of Inspection Findings (SIF) will
be accessible when these documents have been finalised and are available
on Education Scotland’s Website. 
4.5 Lochgilphead Joint Campus had a follow up visit by HMIe inspectors the week
beginning 19th May. 
The link to the published letter will be accessible when these documents have
been finalised and are available on Education Scotland’s Website. 
4.6   Bunessan Primary School and ELC was inspected the week beginning 19th
May using a full model inspection. 
The link to the published letter will be accessible when these documents have
been finalised and are available on Education Scotland’s Website. 
4.7   Rhu Primary School and ELC was inspected the week beginning 19th May
using a short model inspection. 
The link to the published letter will be accessible when these documents have
been finalised and are available on Education Scotland’s Website. 
4.8 A summary of all external school inspection audit reports published by
Education Scotland across Argyll and Bute Education Service establishments
during the period March 2025 to June 2025 is provided in Appendix 1.   
4.9 A summary of the inspection outcomes per establishment detailing strengths and
areas for improvement is provided in Appendix 2. 
5.0 DETAIL – National Thematic Inspections 
5.1 In addition to visits to schools and settings, HMIe also carry out national
Thematic Inspections. 
Page 84

Page 85

5.2 The most recent phase of national Thematic Inspection which took place in
October 2024 focused on Local Authority Approaches to School Improvement
and focused on the following four themes: 
1. How do local authorities support schools to improve the quality of
education through implementing effective improvement planning and
standards and quality reporting? 
2. How do local authorities support schools to improve the quality of
education through self-evaluation and quality assurance? 
3. How do local authorities support schools to improve the quality of
education through professional learning? 
4. How do local authorities deliver universal support and challenge for all
schools, and/or targeted support for specific schools to improve the quality
of education? 
5.3 All 32 local authorities were part of the thematic inspection and overall
findings have been shared through a national report published on Education
Scotland’s website:
Local authority approaches to supporting school improvement | National
thematic inspections | HM Chief Inspector reports and guidance | Inspection
and review | Education Scotland
5.4 Key strengths across the 32 local authorities identified in the report are:
• strategic leadership and collaboration
• data driven self-evaluation
• professional learning and leadership development
• targeted and universal support for schools
• approaches to stakeholder engagement 
5.5 Areas for improvement identified across the 32 local authorities include:
• consistent approach to school support
• strengthening leadership development for middle leaders – particularly for
secondary schools.
• improved use of data for strategic decision making
• enhanced monitoring and accountability for targeted support for schools 
5.5 During the academic year, 2024-2025, HMIE are visiting a number of settings
and schools across Scotland to complete a Thematic Inspection on Literacy
and English. Several Argyll and Bute establishments are participating in the
Thematic Inspection. 
5.6 The link to the full Thematic Inspection report on Literacy and English will be
shared once published on Education Scotland’s website.   
Page 85

Page 86

6.0 CONCLUSION 
6.1 In summary, currently two published reports are available from the six
inspections and one re-visit that took place during the period of March 2025 to
June 2025. 
6.2  The Education Service will continue to use the outcomes of establishment
inspections to work collaboratively with our Head Teachers to target support and
challenge to secure improvement for our children and young people. 
7.0 IMPLICATIONS 
7.1 Policy – The Standards in Scotland’s Schools etc. Act 2000 places a duty on 
Education Authorities to provide children and young people with school 
education and (in terms of raising standards) requires Authorities to endeavor 
to secure improvement in the quality of that school education. 
7.2 Financial – None 
7.3  Legal – None 
7.4  HR – None 
7.5  Customer Service – The outcome of establishment inspections of the Education 
Service of Argyll and Bute Council may significantly enhance or detract from 
the Council’s reputation and attractiveness as an area to work and live in. 
7.6  Risk – Reputational risk to the Education Service following a weak report. 
7.7 Climate Change - None  
7.8  Fairer Scotland Duty: – None 
7.9 Equalities - protected characteristics – None 
7.10  Consumer Duty – None 
7.11  Island Communities - None 
7.12  Children’s Rights and Wellbeing 
Article 28 – I have the right to an education 
Article 29 – I have the right to an education which develops my personality, 
talents and abilities 
Douglas Hendry - Executive Director with responsibility for Education 
Councillor Audrey Forest - Policy Lead for Education
Page 86

Page 87

Jennifer Crocket
Chief Education Officer
Head of Education: Wellbeing, Inclusion and Achievement 
Wendy Brownlie
Head of Education: Performance and Improvement 
For further information please contact:- 
Simone McAdam, Education Manager
Email: Simone.McAdam@argyll-bute.gov.uk 
May 2025 
Appendices
Appendix 1 - Overview of Inspection Outcomes
Appendix 2 - Summary of Inspection Outcomes 
Page 87

Page 88

Appendix 1 - Overview of Inspection Outcomes   
Leadership of
Change 
Learning,
Teaching and
Assessment
Ensuring
Wellbeing,
Equality and
Inclusion
Raising
Attainment and
Achievement 
Establishment  Sector
Date of Inspection 
1.3  2.3  3.1  3.2
Tarbert 2-18 School February 2025 weak satisfactory satisfactory satisfactory
Tarbert ELC ELC February 2025 satisfactory satisfactory satisfactory satisfactory
Rothesay Joint
Campus
School March 2025 not yet published not yet published not yet published not yet published
Rothesay Joint
Campus ELC
ELC March 2025 not yet published not yet published not yet published not yet published
North Bute Primary School March 2025  satisfactory  satisfactory
Salen Primary School March 2025 not yet published not yet published not yet published not yet published
Salen ELC ELC March 2025 not yet published not yet published not yet published not yet published
Bunessan Primary School May 2025 not yet published not yet published not yet published not yet published
Bunessan ELC ELC May 2025 not yet published not yet published not yet published not yet published
Page 88

Page 89

Rhu Primary School  May 2025  not yet published  not yet published
Rhu ELC ELC May 2025  not yet published  not yet published 
The Six-point Scale for Inspection Grading
Excellent 6
Very Good 5
Good 4
Satisfactory 3
Weak 2
Unsatisfactory 1  Page 89

Page 90

Appendix 2 – Summary of Inspection Outcomes
Report Title: North Bute Primary School 
Inspection Agency: Education Scotland 
Key Findings: 
The inspection team found the following strengths in the school’s work. 
• Children are polite and happy. They are proud of their school and have a positive attitude to learning. 
• Staff support children to feel welcomed, cared for and safe in school. Children experience respectful and nurturing
relationships. 
• Staff work effectively with their partners to support children’s learning across a range of contexts. Children learn in a
variety of environments in the local area. 
The following areas for improvement were identified and discussed with the headteacher and a representative from Argyll and
Bute Council.
• Improve the planning of learning and teaching so that all children have consistently high-quality learning
experiences, which are set at the right level of difficulty for them. 
• Improve children’s progress and attainment across the curriculum, including a clear focus on developing writing
skills. 
• Develop staff’s skills in using assessment information to measure the progress children make over time. Staff
should monitor closely the impact of interventions they put in place to close gaps in children’s learning. 
Date of Inspection: March 2025 
Lead Officer to take forward improvement: Marie Law - Headteacher 
Central Officer to support improvement: Susan Galloway – Education Manager 
Report Title: Tarbert 2-18 
Page 90

Page 91

Inspection Agency: Education Scotland 
Key Findings: 
The inspection team found the following strengths in the school’s work. 
• Staff have worked well to ensure relationships in the school are positive. Children and young people are
articulate, respectful and proud of their school. They learn in a welcoming and calm environment. 
• Staff are working together well to improve the quality of learning, teaching and assessment through their
participation in professional learning. 
• Children are making positive progress in developing their skills in writing and numeracy in the primary
department. 
The following areas for improvement were identified and discussed with the headteacher and a representative from Argyll and
Bute Council.
• There is a need to improve the pace of change through developing leadership at all levels and a consistent
approach to monitoring and evaluating the work of the school. 
• Teachers should ensure that they meet the needs of children and young people more through the effective
use of assessment information. • Staff should have high expectations of what children and young people can
achieve. They need to implement a whole school approach to raise attainment across the curriculum. 
• Teachers should review the curriculum to ensure that young people build on their prior learning more
effectively. 
• Staff need to raise the profile of equality and diversity to prepare learners fully for life beyond school. 
Date of Inspection: February 2025 
Lead Officer to take forward improvement: David Mitchell – Acting Headteacher 
Central Officer to support improvement: Brendan Docherty – Education Manager 
Page 91

Page 92

This page is intentionally left blank

Page 93

Community Services Committee Work Plan 2025 - 2026 
This is an outline plan to facilitate forward planning of reports to the Community Service Committee.
Date Paper Designation  Lead Service/
Officer 
Regularity of
occurrence/
consideration 
Comment
5 June 2025 
Police Scotland - Argyll & Bute
Performance Summary Report –
Reporting Period: April 2024 - March
2025
Police Scotland Quarterly 
Scottish Fire and Rescue Service –
Argyll & Bute Performance and
Scrutiny Group 2024-25 Q4 Scrutiny
Report
Scottish Fire and
Rescue Service
Quarterly 
Argyll & Bute Health & Social Care
Partnership – Performance Report –
FQ3 2024/25 (October – December)
Argyll & Bute
HSCP
Quarterly 
Schools (Consultation) (Scotland) Act
2010 – Relocation of Tobermory
Campus
Education   
External Education Establishment
Inspection Report
Education Quarterly 
28 August 2025 
Police Scotland Argyll & Bute
Performance Summary Report –
Reporting Period: Q1 April – June 2025
Police Scotland Quarterly 
Scottish Fire and Rescue Service –
Argyll & Bute Performance Report Q1 –
1 April – 30 June 2025 
Scottish Fire and
Rescue Service
Quarterly 
Argyll & Bute Health & Social Care
Partnership – Performance Report –
FQ4 2024/25
Argyll & Bute
HSCP
Quarterly 
Page 93
Agenda Item
9

Page 94

Community Services Committee Work Plan 2025 - 2026 
External Education Establishment
Inspection Report
Education Quarterly 
Future Reports – dates to be determined 
The Expansion of Funded Early Years
Learning and Childcare in Scotland –
Argyll and Bute Early Learning and
Childcare Updated Delivery Plan
Education   
Care Experienced Children and Young
People
Education   
Argyll & Bute Health & Social Care
Partnership – Annual Report
Argyll & Bute
HSCP
Annually 
Argyll and Bute Annual Education Plan Education Annually in August 
Live Argyll Monitoring and Performance
Report & Live Argyll Annual Report
Commercial
Services/Live
Argyll
Annually in August 
Gaelic Language Plan Progress Report Customer Support
Services
Annually in August 
Year 2 2024/25) Annual Review of the
Children and Young People Service
Plan 2023 - 2026
Argyll and Bute
HSCP
Annually 
Scottish Attainment Challenge Education   
Education Refresh Strategy Education   
Schools (Consultation) (Scotland) Act
2010 Dalmally Primary School
Education   
Schools (Consultation) (Scotland) Act
2010 Furnace Primary School
Education  Come back to Committee December 2025 
Education Performance Data
Analysis 2023-24
Education   
Page 94