Item No: 6 
SUBJECT: Home Support Service 
TO: Integration Joint Board Performance, Finance & Audit Committee
Lead
Officer for
Report:
Diane Fraser, Chief Officer Adult Social Work Services NL HSCP
Author(s) of
Report
Karen Workman, Senior Manager Adult Social Work  
DATE: 21 August 2024 
1. PURPOSE OF REPORT
1.1 In North Lanarkshire there has been a sustained approach to supporting people
to live safely and independently at home, connected to their family, friends and
local community for as long as possible. Whilst we have a range of social care
supports available to support people in North Lanarkshire, the Home Support
Service is key to ensuring that people can remain at home and contributes to
the sustained efforts to maintain a positive balance of care in the North
Lanarkshire. 
1.2 This report will inform the progress on the implementation of the redesign of the  
Home Support Service which was approved in 2018. It will outline the work that
has been undertaken following the recovery from the pandemic focusing on
areas such as demand, complexity of support, workforce challenges, new
models of delivery from acute setting and changing demographics. This will
demonstrate that the model approved in 2018 remains fit for purpose and aligns
with the current aims and objectives of the Strategic Commissioning Plan. 
1.3 This paper is coming to the Integration Joint Board Performance, Finance and
Audit Committee, 
For Approval: ☐ For Endorsement: ☐ To Note: ☒

Page 2

2 
2. ROUTE TO THE BOARD
This paper has been:
Prepared By:
Donna
Bridges
Karen
Workman
☒ Reviewed By:
Diane Fraser
☒ Endorsed By: ☒          
3. RECOMMENDATIONS
3.1 It is recommended that the IJB PFA Committee: 
3.1.1 Acknowledge the developments within Home Support Service and the progress
being made to implement the approved operating model. 
4.  VARIATIONS TO DIRECTIONS?
4.1      This section outlines if the report requires a direction to be issued to the Local 
Authority, the Health Board, to both, or that no direction is required.        
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 The Health and Social Care Partnership are committed to ensuring individuals
who are referred for a needs-based assessment to enhance their daily living
get the right support, at the right time and in the right place.  To maximise an
individual’s independence and resilience, reablement and rehabilitation
services are key to this process. 
5.2 The plan for the new operating model to deliver Home Support was agreed by
the IJB in March 2018. The model was based on the outputs of the Cross−Party
Working Group, the advice from support officers and wider officer research, the
proposed new model focuses on five major elements:
 Integrated Model (Discharge to Assess in Localities) 
 Same Day Response/Reablement/First Support (Intensive and time
limited) 
 Specialist Teams (e.g. supporting people with frequently changing
needs and end of life / Palliative Care) 
 Ongoing Paid Support (allocation of an individual budget to deliver
individual outcomes as part of SDS) 
 Quality Assurance (improving standards of care) 
Yes ☐ No ☒ N/A ☐

Page 3

3 
5.3 The plan outlined that the Home Support Service was to be a functional model
based on two elements; assessment and planning (overall assessment and
planning activity or the service) and long-term service delivery which will be
referred to as the Living Well Service (providing support to those with complex
health and social care needs). 
5.4 The implementation of the new operating model commenced prior to the
pandemic which included the centralisation of the management and
administration of the service.  Although elements were progressed, the
pandemic had a significant impact on the Services’ ability to fully implement the
model. 
5.5      In response to the pandemic a number of changes had taken place to enable
the service to operate during very challenging circumstances. Social care
provision faced considerable workforce challenges as well as significant
changes to the way care and support was delivered. To support recovery there
was significant investment which was reported through the Winter Planning and
Enhanced Support Business Case.  The investment in a range of activities
including Home Assessment, Reablement and Rehabilitation was key to
delivering key elements of prevention and early intervention which accelerated
elements of the Home Support model. The success of the new model is also
predicated on the investment and delivery of new systems Mosaic and dynamic
scheduling system to modernise the service. Following this period of recovery,
a review was agreed in 2022 to ensure that the model agreed in 2018 remained
fit for purpose. 
5.6  This report will outline the work undertaken to engage staff and those who
receive services as well as the partnership work that has been undertaken with  
Home Support Workforce
Assessment and
Planning
Living Well Service
Enabling Approach

Page 4

4 
the Care Inspectorate to improve the quality of service being delivered in North
Lanarkshire to improve outcomes for people who need support. 
5.7 Report 
5.7.1 The service currently supports 2,235 individuals.  Data gathered and used to
inform changes highlights the significant growth in multi worker visits whereby
33.5% of all visits require two or more workers to support service users at each
visit.  This upward trajectory (Graph1) displays evidence of some of the
challenges that are currently facing the service.  Work is in the early stages of
exploring single handed care, which will be of significant benefit to the service
once this is fully embedded and supported in the future. 
Graph1 
5.7.2 Over the last financial year, the service received 3,800 requests for assistance
from people not known to the service.  The number of care hours delivered has
risen steadily since the pandemic (Graph2) and remains significantly higher
than the hours delivered pre covid.

Page 5

5 
Graph2 
5.7.3 Despite the increase in the hours provided, the number of service users have
fallen in the corresponding time frame.  The service users that are now
supported present with more complex health and social care needs.  As the
number of individuals in the community with complex care needs continues to
rise, the requirement for specialist provision becomes more apparent.   
5.7.4 North Lanarkshire has, for many years, had a positive balance of care, a term
which is used to refer to the balance of support and care available within the
community- based settings compared with support within residential settings.
This is supported by the continued investment in community – based supports
and a long standing commitment to self-directed support. This is underpinned
by community support which is co-designed with individuals and their carers/
families.  This approach has resulted in a high proportion of individuals
remaining at home. 
5.7.5 Local Government Benchmarking Figures 2022/23 report that 65% of
individuals over the age of 65 with long term needs receiving 10 or more hours
of home care per week which is above the Scottish average of 61%. Along with
other providers, NLC Home Support Service is a key resource within North
Lanarkshire to enabling individuals to remain at home and retain a positive
balance of care.

Page 6

6 
5.7.6 In line with the five key elements outlined by the cross-party working group
integrated care remains a priority. The operating model for localities in UHNL
HSCP is underpinned by an enabling approach which is being embedded
through robust screening, assessment and resource allocation. This approach
will ensure that individuals, carers and families have a support plan that is co-
designed, with good information, utilising local resources and alternative
support which is proportionate. 
5.7.7 Assessment and Planning 
The development of an integrated approach through the establishment of Home
Assessment Team working closely with Reablement and Integrated
Rehabilitation Team builds on the work to deliver discharge to assess and same
day response. This aligns the home support workforce with locality health and
social work teams and will provide a range of resources to facilitate assessment
and planning. By adopting this approach, it will ensure that when someone
needs longer term support it is based on thorough assessment and support
planning. This will be for people whose needs are more complex, including end
of life care, within their own home.   
5.7.8 The performance of both the Home Assessment and Reablement Team
demonstrate that consistently more than 50% of people leave without ongoing
support. In the last quarter 58% of people left reablement with no services or a
reduction. The growing evidence highlights that short term assessment and
reablement increases independence and reduces dependency on further care
and support. 
5.7.9 This work has also contributed to the improved discharge planning at both
University Hospital Monklands and University Hospital Wishaw.  Ongoing
actions to maintain flow are essential to reduce readmissions and demand for
long-term care and support, including the sustainability of the Home Support
Service.  A shift of focus to same day discharge and assessment and
rehabilitation at home will improve outcomes and support quicker recovery. 
5.7.10 Living Well Service 
When people need ongoing paid support, it is essential that waiting times are
minimal and people have options as to how this will be delivered. Following
assessment and support planning, individuals will have the option of NLC home
support delivered by the Living Well Service. Supported people can consider
how their support is delivered through the 4 options as outlined in the self-
directed support legislation. At the point of review, options will be discussed
including individual budgets or direct payments which can be used flexibly to
meet identified outcomes.

Page 7

7 
5.7.11 The home support workforce in North Lanarkshire, provides essential support
and care to individuals, carers and families. The Living Well Service will
continue to provide care and support to individuals who require longer term,
planned support. Due to the changing demographics and complexity of
individuals requiring support, the workforce will be able to provide a responsive,
flexible approach to those with fluctuating needs. 
5.7.12 The workforce establishment and structure need to be finalised to allow for the
model to be fully operational. This work will be ongoing with business partners
and trade unions. 
5.7.13 Workforce 
There are approximately 1,387 staff employed by NLC Home Support Service,
with a worker profile of 6% male, 16.99% age 60 and over and 6.48% age 30
and under. This includes Home Support Workers in Reablement, Home
Assessment Team, Intensive, Community Alarm and Living Well Service. The
management and support roles were reviewed, and a new structure
implemented in 2019. These roles support with scheduling visits, carrying out
reviews, supervision and training. 
5.7.14 Recruitment of Home Support Workers remains a challenge due to the high
turnover of staff. However, the recruitment of staff to assessment and planning
has been prioritised to support the operational model. 
5.7.15 The need for a competent, confident workforce which is supported by a
sustainable learning and development programme is key to ensuring safe, high-
quality practice by motivated staff.    The service has invested in dedicated staff
to support learning and development through training, including refresher
cycles, and investment in workforce development to provide high quality care. 
5.7.16 An overall training plan has been created and has been made available to
managers within the service.  The plan ensures key activity is progressed
including monitoring mandatory training for Home Support Workers as well as.
highlighting registration requirements for all staff to deliver quality driven service
offering flexibility and focused on service user outcomes. The below Graph 3
provides information relating to the increase of staff members undertaking core
training.

Page 8

8 
Graph 3 
5.7.17 The service has been reporting higher levels of absence over the past 12
months which has an impact on service delivery. There is ongoing work with
Employee and Policy Officers to review the current situation. 
5.7.18  It is important to note that the agreed model intended to deliver a more
financially viable service. The budget allocation for 2024-2025 is £48.083m.
The shift of resources to focus on prevention and early intervention is essential
to assist in managing demand to ensure people get the right support at the right
time. There are a number of key actions for the service to create efficiencies
and they include the introduction of a dynamic scheduling tool which is a key
development.   
5.7.19 Dynamic scheduling system 
Individuals regularly request support and care at key points in the day and this
can place pressure on the service. The current shift patterns of staff do not
always match with the demand. The dynamic scheduling tool will assist with this
but due to the number of different shift patterns that exist it will be necessary to
consider how we address this to ensure a more efficient service.  
5.7.20 A key aspect of service efficiency and improvement is the implementation of a
dynamic scheduling tool to benefit Home Support Workers in the community
and for those who schedule and plan work.  It is an essential development to
aid back-office staff to efficiently and effectively schedule support and adapt
quickly with changing needs. The tool is vital due to the current contract with

Page 9

9 
Advanced/Kirona expiring on 31st October 2024, with no further option to extend
as the current product is end of life. Following a procurement exercise Access
CM were awarded the contract. 
5.7.21 The contract to provide a dynamic scheduling tool will offer a wider range of
benefits to staff and service users alike with the ability to produce accurate
reports which will help to inform future demand upon the service.  The tool will
improve consistency, reduce missed visits, and incorporate travel time
accurately.  For the first time, the service will be able to monitor care delivery in
real-time and monitor quality indicators such as punctuality, continuity and
service duration.  The tool will demonstrate how person-centred support
improves quality of life and measures the effectiveness of care delivered. 
5.7.22 Work patterns for frontline staff require to be reviewed. This will be essential to
ensure any efficiencies arising from the implementation of a dynamic
scheduling tool can be implemented. The workforce workstream have identified
gaps in service provision that require to be addressed through the review.   
5.7.23 Ongoing work continues for data cleansing and transfer as well as identifying
training programmes in preparation for the new tool including the
implementation of Mosaic (new case management system).     
5.8 Engagement 
5.8.1 An important aspect in the review of the service model was to involve both staff
and individuals who use the service by offering opportunities for them to shape
the service by active participation. 
5.8.2 Consultation with the workforce and stakeholders was undertaken through a
series of events including face to face meetings across all locality areas and
surveys to capture views and experiences of the current and future model. 
During each consultation event operational issues were captured and
addressed which included ‘You Said, We Listened’. 
5.8.3 Staff highlighted areas for improvement and issues that impacted on their work.
They also had the opportunity to explore various options. Common themes
reported by staff:
 Not having enough travel time.
 Having difficulty contacting their managers. 
 Waiting time for the Out of Hours Service and not always having enough
time to undertake required tasks.  
 Impact of current work pattern on continuity and consistency of care
including, lack of staff working backshifts, downtime at various points in
the day and not having enough staff at peak times resulting in over time
being utilised to ensure service delivery.

Page 10

10 
5.8.4    The engagement with supported people and their cares/ families highlighted
recurring themes and included the need for continuity of care with consistency
of carers and timing of visits however many reported that carers were respectful
and courteous. 
5.8.5 Following consultation with the workforce and stakeholders, benchmarking was
undertaken with eight local authorities including Renfrewshire, East
Dunbartonshire, South Lanarkshire, Inverclyde, Falkirk, Fife and Glasgow to
gain a more in-depth knowledge and understanding of other Health and Social
Care Partnerships, how they operate and manage Care at Home and Home
Support provisions.  This included gathering data across key areas of service
delivery including preventing hospital admissions, facilitating hospital
discharge, managing demand, cost and system.   
5.8.6 The information collated has allowed the service to identify best practice and
useful learning from others to develop a structure for the Home Support
Workforce. A workforce plan is being finalised.   
5.9 Improving Quality 
5.9.1 The proposed changes will ultimately ensure people have a high quality, safe
and compassionate care and support, which is sustainable and maintained
across all localities. 
5.9.2 The service continues to work closely with the Care Inspectorate to meet
requirements and make the improvements that have been identified through the
inspection process.  Challenges from staff absence and recruitment of
appropriately skilled individuals have previously impacted on direct delivery and
management teams, however, the service is starting to see an improving
picture.

Page 11

11 
5.9.3 The key issues and risks now arising from inspections are lack of consistency
of support, system issues relating to the recording of missed visits and
incorporating travel time, lack of training in developmental areas and outdated
reviews and personal support plans.  Good progress has been made in four of
the teams, with two teams being high-risk areas for staffing and performance,
particularly in relation to outstanding reviews and personal support plans. 
Improvement plans have been devised to progress the significant work, which
is overseen by the Senior Social Work Manager.  The full implementation of a
dynamic scheduling tool will reduce missed visits, incorporate accurate travel
time (both walking and driving) and improve consistency of scheduled care.   
5.9.4 A demonstration has been provided to all Inspection Officers to give an
overview of the main project benefits/goals, modules involved and examples of
reduction in missed visits, improving efficiency and stronger continuity of care
which have been consistently highlighted by the Care Inspectorate as areas for
improvement. 
5.9.5 The new inspection year commenced in April 2024 and the service has been
advised each team will receive a full inspection during follow up visits, and will
now involve three inspection officers, with a lead officer identified for each team.
In addition, there are plans to conduct a separate review of recruitment
processes during 2024, distinct from the ongoing inspections in localities.   
6. CONCLUSIONS
6.1  This report outlines the progress that has been made to implement the
operating model for the Home Support workforce establishing a functional
model. This will focus the workforce on distinct areas and ensure a delineation
between assessment and planning and provision. 
6.2 The impact of change detailed in the report will improve the quality and
consistency of care and support, improve recruitment and retention, address
impaired staff morale, improve Care Inspectorate grades and maximise
efficiencies and capacity within the service.  This will be supported by good
governance, clear infrastructure, a skilled workforce and improved culture and
environment.   
6.3 There has been an incredible amount of work undertaken to ensure that the
operating model is fit for purpose and can adapt into the future as we respond
to whole system changes.   A further update will be provided with the finalised
operating model and associated workforce establishment.

Page 12

12 
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES.
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
7.2 ASSOCIATED MEASURE(S)
The following measures of success have been identified: 
7.2.1 Improving the wellbeing of supported people’s outcomes. 
7.2.2 Evidence of reablement reducing service users’ dependence on long term
home support, working collaboratively with the Assessment and Planning
teams to ensure that we continue to support individuals’ independence and
rehabilitation. 
7.2.3 Improved discharge response from Lanarkshire and Glasgow Hospitals. 
7.2.4 Prioritised resources for ongoing longer-term support which will include the
upskilling of the home support workforce to support service users with complex
health and social care needs within their own homes. 
7.2.5 A flexible and responsive service with evidence of improved quality of care,
support and service delivery resulting in increased Care Inspectorate grades,
staff, and service user satisfaction. 
7.2.6 A competent and confident workforce, fully staffed teams with minimal turnover. 
7.2.7 Ensure a sustainable financial model.

Page 13

13 
7.2.8 Have a service which can respond to future demand, with a workforce that can
provide a flexible, responsive, outcome-based approach to supporting people
at home. 
7.3 FINANCIAL
7.3.1   Currently working with Finance Business Partners to determine any financial
implications to implement the operating model and associated structure. 
This paper has been reviewed by Finance:
Yes   No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Choose an item. 
7.5  ENGAGEMENT & PARTICIPATION
7.5.1   Engagement and participation with all stakeholders are of utmost importance
for this piece of work. As such a detailed communication and engagement plan
is being developed to ensure that all stakeholders are kept informed throughout
the remainder of this project.   
7.5.2   Please tick the engagement and participation objectives that link(s) with this          
piece of work and provide further details on the engagement and participation 
that was undertaken. 
Objectives  Further details 
☒ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
Events to be arranged for staff,
service users and all relevant
stakeholders. 
☒ Provide stakeholders with information on
how to get involved
Information leaflets to be issued/
quarterly information bulletins. 
☒ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
Questionnaires will be issued.
☒ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☒ Provide regular feedback on how
stakeholder engagement and participation is 
shaping and influencing service
development and delivery
Information will be provided bi-
monthly in the form of newsletters

Page 14

14 
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
Tablets are available at the events
where a survey can be completed
(QR codes available). 
☒ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff 
☒ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes  No  N/A 
EQIA added to website: 
Yes  No  N/A 
8. BACKGROUND PAPERS 
N/A 
9. APPENDICES 
None. 
Diane Fraser Chief Officer / Head of Service (Adult Social Work Services)
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Members seeking further information about any aspect of this report, please contact
the following;
Karen Workman, Service Manager Adult Social Work. workmank@northlan.gov.uk

Page 15

15 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number  2024/2108-06
2 Report Title  Home Support Service 
3 Date direction issued by
IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke
a previous direction – if
yes, include reference
number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed