Democracy Spraffa

ITEM 6 Hospital At Home

North Lanarkshire Council · 21 February 2024
Back to IJB Performance, Finance and Audit Committee — 21 February 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
REPORT 
Item No: 6 
SUBJECT: Hospital at Home
TO: Integration Joint Board Performance, Finance & Audit Committee
Lead
Officer for
Report:
Ross McGuffie, Chief Officer, NL HSCP
Author(s) of
Report
Hazel Mitchell, Service Manager, AHSU
DATE: 21
st
February 2024 
1. PURPOSE OF REPORT 
This paper is coming to the IJB PFA for noting of the current Hospital at Home
service provision, the service expansion updates, and the strategic risks to the
longevity of maintaining increased performance. 
For Approval: ☐ For Endorsement: ☐ To Note: ☒ 
2. ROUTE TO THE BOARD 
This paper has been prepared by Hazel Mitchell, Service Manager to update the
Board on the current H@H service performance, and to update on on-going
expansion plans. The paper has been reviewed by Jamie Quin, General Manager,
AHSU 
Prepared By: ☒ Reviewed By: ☒ Endorsed By: ☐

Page 2

2 
3. RECOMMENDATIONS
The IJB PFA are asked to approve the following recommendations:
(1) In line with the Scottish Government initiative to implement a Hospital at
Home service in every Board in Scotland, that NHS Lanarkshire shall expand
their service provision to the Clydesdale locality within South Lanarkshire.
(2) In line with the Board’s Unscheduled Care strategy, that Hospital at Home
should seek to expand their operating hours to increase virtual bed capacity.
(3) To ensure that the service is achieving maximum efficiency and operating in
line with the Boards strategic objectives, a Rapid Strategic Review would be
undertaken. 
4. VARIATIONS TO DIRECTIONS?
This section outlines if the report requires a direction to be issued to the Local
Authority, the Health Board, to both, or that no direction is required 
Yes ☐ No ☒ N/A ☐ 
5. BACKGROUND/SUMMARY OF KEY ISSUES 
5.1) The Health Board are trying to increase virtual beds and reduce hospital
attendances in line with their Unscheduled Care & Winter Planning programmes
5.1) The Scottish Government has a National Objective to double virtual bed
capacity by 2025 
6. CONCLUSIONS
6.1) Hospital At Home service in NHSL has continuously increased virtual bed
capacity every year since 2019 via its expansion programmes and pilots.
6.2) KPIs including increased capacity and reduced LOS have all been achieved
(data embedded)
6.3) Risk factors to future expansions include non-recurring finding streams

Page 3

3 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services
☒
Health and Social Care Services contribute to reducing health inequalities ☐
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services
☐
7.2 ASSOCIATED MEASURE(S) 
7.3 FINANCIAL
Substantive Budget £2.79m (inc Clydesdale & Stepdown) = 96 virtual beds
One year non-recurring pledge of £1.25m for additional 60 beds (48 H@H & 12
Cardiology) from SG/Unscheduled care.
Risk in confirmed recurring funding has made achievement of additional 60 beds
challenging and will only be mitigated by permanent funding.
This paper has been reviewed by Finance: 
Yes  No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT
Non confirmation of recurring funding to substantiate current expansion plans will
reduce virtual bed capacity back to 96 substantive virtual beds.

Page 4

4 
Relevant Risk Register
Details
Current Risk Level Risk Owner 
Choose an item. 
7.5 ENGAGEMENT & PARTICIPATION
.
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details on the engagement and participation that was
undertaken. 
Objectives Further details
☒ Involve stakeholders in the development
work aimed at achieving the national
outcomes
All staff and relevant management
have been involved in service
changes and expansion plans
☒ Provide stakeholders with information on
how to get involved
All staff and community colleagues
have been informed on how to
engage and onward refer to H@H
☒ Ensure a diverse range of engagement
and participation and opportunities are in
place to suit different needs
Various working groups and patient
forums are on-going
☒ Measure how well we involve community
stakeholders in the planning, design
and delivery of our services
Community stakeholders are
involved in active working groups
including patient representation
where appropriate
□ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery 
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
Always supported and encouraged
□ Develop participation guidelines to
ensure a common understanding and set of
expectations for both stakeholders and
partnership staff 
☒ Support engagement planning and
participation in localities, taking account of
other engagement activity and local plans
across the Community Planning
Partnership

Page 5

5 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes  No  N/A 
EQIA added to website: 
Yes  No  N/A 
8. BACKGROUND PAPERS
None. 
9. APPENDICES
Please include a glossary of terms if not already included. 
Appendix 1– H@H update January 2024, author Hazel Mitchell
Appendix 2– H@H Rapid Strategic Review Recommendations, authors Claire
Rae & Maggs Thomson (Head of Health for South & North HSCPS respectively)
Appendix 3– H@H Data 2023, author Hazel Mitchell
Appendix 4– H@H Funding Application update as at January 2024, author Hazel
Mitchell 
CHIEF ACCOUNTABLE OFFICER (or Depute)
Members seeking further information about any aspect of this report, please contact
the following;
Hazel Mitchell, Service Manager, AHSU Hazel.Mitchell@lanarkshire.scot.nhs.uk
Jamie Quin General manager, AHSU Jamie.Quin@lanarkshire.scot.nhs.uk

Page 6

6 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction supersede,
revise or revoke a previous
direction – if yes, include
reference number(s) 
7 Functions covered by direction 
8 Full text of direction 
9 Budget allocated by Integration
Joint Board to carry out
direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be reviewed

Page 7

7 
Appendix 1 
TITLE & PURPOSE OF
PAPER:
NHS Lanarkshire Hospital at Home Service; Update for IJB
DIRECTORATE: Adult Health Services Unit
DATE: 15 January 2023
AUTHOR: Hazel Mitchell 
1)   BACKGROUND 
Hospital at Home (H@H) was initially set up as an Admission Avoidance service by NL H&SCP in
2011. The service covers all areas of North Lanarkshire and areas of South Lanarkshire (excluding
Camglen) 
With prior endorsement from the (then recently retired) Cabinet Secretary for Health, all areas of
Scotland were to introduce a H@H service. Having created the first H@H Service in 2011, the task
for Lanarkshire was to provide full geographical coverage by the service, and expand our virtual
bed capacity in already existing localities 
In 2022 the H@H service undertook a large scale project to introduce the service and provide 12
virtual beds in the Clydesdale locality within South Lanarkshire, and to extend the operating hours
of the whole service. 
In February 2022 the service participated in the organisation’s “Firebreak” process and use the
opportunity to test the value in extending their operating hours to later in the evening and
weekends. This was evaluated with the learning and outcomes used to inform future decision
making and service changes. 
2)   GENERAL OVERVIEW 
H@H Operates a service model that consists of 4 Hubs/Teams, 3 located within the Acute
Hospitals across Lanarkshire, with the Monklands and Wishaw Hubs covering North Lanarkshire
and the Hairmyres Hub covering the Hamilton & EK localities of South Lanarkshire. A new hub has
been opened in Carluke Health Centre to cover the Clydesdale locality. 
The substantive operating budget is £2.1 million for the 3 teams within Acute sites, each team has
a staffing structure incorporating:
 Band 7 Team Leader
 Band 6 Nurse Practitioners
 Band 4 APR’s
 Band 3 Administration Staff 
The service is currently Medically (Consultant) led and each Hub is supported by Consultant
Geriatricians from the associated Acute Hospital Site, for which NL H&SCP meet the funding. 
The teams above each provide 24 virtual Admission Avoidance beds, 72 in total. 
While successful, the original operating model described above provided challenges to growth &
expansion. The lack of available Consultant Geriatricians within the recruitment market meant a
replication of the Consultant led model was not possible, and alternative would need to be
devised. In response to this plans to introduce Advanced Practitioners into the H@H model were

Page 8

8 
:
ANP (B7) 1.00 wte £61,118
RGN (B5) 3.00 wte £123,279
APR (B4) 1.00 wte £33,686
TOTAL Recurring Annual Cost £218,083 
initiated. In principle, qualified and experienced Advanced Practitioners could work autonomously
as clinical decision makers. It was proposed to implement this role into the service to work in
collaboration with the Consultant Geriatricians. 
HIS under the direction of the Scottish Government have supported expansion plans in NHSL H@H
by providing non‐recurring funding to help us implement expansion proposals 
Over the course of 2022 & 2023 the following expansions were implemented:
 Confirmed substantive implementation of Stepdown ‐ 12 virtual beds
 Service coverage into Clydesdale locality – 12 virtual beds
 Service coverage for identified Cardiology Heat Failure patients requiring infusion – 3 beds
 Extended hours working via Firebreak programme
3) EXPANSION PROGRAMMES   
STEPDOWN:
Model:
Stepdown model was introduced in 2020 as a response to the Covid pandemic. This allowed 12
ring‐fenced virtual beds to assist with hospital flow. Inpatients within the COTE wards who were
still acutely ill and met the H@H clinical criteria could be discharged home and vacate an inpatient
bed, with the remainder of their care being delivered by H@H. 
Clinical criteria & referral pathways were developed using the Trakcare Workbench function to
accurately record the patient’s movement and transfer the care record. 
Funding:
In 2022/23 the Board permanently funded the Stepdown facility within and the following funding
was received: 
Service Provision:
By 2022/23 the Stepdown function were managing over 36 referrals per month, with an average
LOS of 5.5 days. By end September 2023 this service had increased capacity to an average of 46
referrals per month and reduced LOS to 3.81 days. 
The addition of this facility also allowed for the introduction of Band 5 RGN posts into the service,
which provides attraction and career progression into the service. Since establishment in 2020, 2
Band 5 RGNs have progressed into Band 6 Nurse Practitioner posts. 
CLYDESDALE
Model:
The expansion into Clydesdale was anticipated to increase virtual bed capacity by 12 beds 
Due to the lack of additional Consultant availability and the rural nature of the region it was
agreed to implement an ANP model to this locality. In contrast to the existing H@H model,
patients would be reviewed by a Band 7 ANP and discussed virtually with the Consultant to

Page 9

9 
confirm the clinical plan. The framework for the ANP roles was established in collaboration with
Practice Development. 
The project was commenced late 2021 with the first actions being to:
 Confirm funding
 Recruit Project Manager
 Recruit clinical staff
 Compose patient pathways into service
 Compose SOPs to govern the ANP model
 Define Patient cohort and demand
 Establish working relationship with Clydesdale locality Senior management and ICST
teams
 Identify accommodation
 Plan & endorse electronic patient record keeping
 Plan & endorse POCT 
Funding:
In 2022/23 the Board provided funding as per below to fund a 12 virtual bedded service: 
ANP (B7) 2.28 wte £139,349
NP (B6) 1.77 wte £89,790
APR (B4) 1.77 wte £59,736
Admin (B3) 0.50 wte £14,699
Supplies & Equipment £20,500
TOTAL Recurring Annual Cost £324,074
£27,006 TOTAL Recurring Monthly Cost 
Aim of Service Provision:
To ensure the service was providing care to the most appropriate patient cohort, (and not to
reroute patients from existing appropriate community services) a demand profile was established
as per below using the criteria:
 patients admitted to hospital via ED
 Over 65 years of age
 Registered to a Clydesdale postcode
 Admitted between 8am and 4pm, Monday‐Friday (H@H operational service hours)
This data showed:
 1438 hospital admissions during H@H working hours (8am‐4pm, Mon‐Fri)
 710 of those were clinically suitable for H@H referral
 Potential for 13.6 referrals per week. 
The service therefore aimed to safely prevent 13.6 hospital admissions per week. 
Process for implementation:
 A working group was set up to ensure collaborative working between Clydesdale locality
teams and H@H.
 Accommodation was identified within Carluke Health Centre and the team are located
with ICST to ensure good communication, collaborative working, and safe and effective
patient care.

Page 10

10 
 Staff recruitment was commenced and concluded. All staff were in post by summer 2023.
The Band 7 ANPs were all recruited on an Annex 21 Trainee basis.
 New patient pathways and SOPs were devised and ratified to ensure patients are referred
and managed safely
 The use of electronic patient records on patient Trak were tested, ratified and
implemented to allow for virtual working between ANP/Practitioners and Consultants.
 POCT and CRP machines were purchased to maximise efficiency in diagnostics and
treatment plan initiation.
 Trainee ANPS were supported by Practice Development and a Senior ANP to ensure their
compliance with the ANP framework and academic programme.
 Robust Communications programme to ensure all GPs and community teams were aware
of service, service provision, criteria and referral process. Also patient engagement events
were attended by the team.
 A Band 6 Project manager was recruited and funded by HIS on non‐recurring funding. 
Achievements to date:
The Clydesdale hub began accepting “test” patients in a planned manner in May 2023, with multi‐
disciplinary reviews after each case to assess success and explore any issues. By August 2023 the
hub was fully functional in its intended manner and operation from its new base in Carluke Health
Centre. 
The team have increased their live capacity each month, and by December had an average of 10
patients per week and an average LOS of 7.2 days. This is referral rate is expected to have reach a
weekly average of 14 patients by end of March 2024, as set out in the main aims of the
programme. 
Associated Risks:
ANPs are currently still in Training Programme, and are therefore not fully qualified autonomous
practitioners, but are receiving enhanced Consultant support to allow the service to function as
expected. It is anticipated that 3 of the 4 Trainee ANPs will be fully signed off by June 2024. 
CARDIOLOGY HEART FAILURE: 
Model:
As part of HIS non‐recurring funding programmes, they financially supported the recruitment of 2
Band 5 RGNs to administer the infusion of IV Furosemide to identified Heart Failure patients. This
was with the intent that these patients, as identified by Heart Failure nurses as being clinically
safe to remain at home for infusion, would no longer need to occupy an inpatient bed for up to 5
consecutive days for infusion only purposes. These patients are still clinically responsible to the
Heart Failure service and H@H are responsible for the infusion only. 
Funding:
His Funded £105,000 = 2 x band 5 RGN, non‐recurring for 1 year only 
Service Provision:
Due to the fixed term nature of this post, only 1 staff member was successfully recruited. The pilot
is live. We have been unable to manage all patients at home as the Heart Failure pathways do not
currently allow for management of other medical issues (such as Acute urinary retention).
Therefore to develop this more robustly new clinical pathways would need to be developed. A

Page 11

11 
0.0
1
separate bid to the Government for an enhanced Cardiology H@H service has been submitted by
the Cardiology team which may address this. 
Risks:
 Not fully adapted to keep all patients at home as yet
 Non‐recurring funding made recruitment unsuccessful 
EXTENDED HOURS VIA FIREBREAK PROGRAMME:
In February 2023, the H@H participated in the NHSL Firebreak programme. 
Aim of Service Provision:
To increase virtual bed capacity within the service, and reduce hospital attendances and
admissions by extending operating hours to include evenings and weekends. 
Process for Implementation:
 Amend opening hours to accept new patient referrals up to 8pm Monday‐Friday (9pm for
Care homes), and from 8am until 4pm at weekends (5pm for care homes).
 Implementing a temporary organisation change to amend shift patterns and off duties for
Practitioner and support staff
 Creating a virtual process for Consultants to review patients
 Enhanced Communications programmes to GPs, SAS, ERC, Care homes and OOHs to
ensure they were aware of our new operating schedule.
 Recruitment of Locum junior doctors and redeployment of Nursing staff from other
services within AHSU 
Achievements:
The service increased the active caseload by 77% over the 9 day period, with referrals totalling
129 compared to the average 73 (compared to an average 9 day period pre firebreak). 
14 
120.0
H@H FIREBREAK REFERRAL ACTIVITY OVER
9 DAY ROLLING PERIOD
29 
100.0 
80.0 
60.0 
40.0  42 45
35 
66 
31.2 
80 
41.6 
95 
52.0
113 
62.4 
72.8
20.0 20.8 21 21 
0.0 
Fri
24/02/23 
Sat
25/02/23 
Sun
26/02/23 
Mon
27/02/23 
Tue
28/02/23 
Wed
01/03/23 
Thu
02/03/23 
Fri
03/03/23 DURATION OF FIREBREAK
Rolling Average of Referrals pre Firebreak
Actual Number of Referrals during Firebreak
NUMBER OF REFERRALS

Page 12

12 
4) ON‐GOING WORKSTREAMS 
RAPID STRATEGIC REVIEW 
In 2023, The organisation requested a Rapid Strategic Review be undertaken. This was jointly
chaired by the Head of Health from both North & South HSCPs. It was supported by the Planning
department. The outcome is shown in appendix 2. 
UNSCHEDULED CARE/WINTER EXPANSION
The Organisation requested via the Unscheduled Care Board that H@H expand their service
capacity in response to winter pressures. The initial plan was to replicate the Firebreak
programme with the intention of introducing an additional 48 virtual beds to the service. 
Thus far recruitment has been unsuccessful as the non0recurring budget for 6 months has made
the posts unattractive to candidates. The Band 7 ANP posts were funded permanently and they
have been filled with candidates taken up post between January & February 2024. 
The lack of additional staff meant that the service could not sustainably replicate the firebreak
programme for a 6 month period, as it was not sustainable with the staffing resource in post. 
Current achievements include increasing virtual bed capacity by 12 beds by extending operational
hours to 6pm instead of 4pm. 
Future Aims:
 To substantively provide a 7 day/12 hour operational service to increase capacity
permanently 
Risks:
 Lack of substantive funding as non‐recurring budget does not allow tests of change or
pilots to be tested and proven effectively.
 Current ANPs are Trainees and will have a year before all are qualified and signed off
 Lack of new Consultants in recruitment market 
5)   CURRENT SERVICE DATA 
Information is included under appendix 3 and 4.

Page 13

13 
Appendix 2
HOSPITAL AT HOME RAPID STRATEGIC REVIEW RECOMMENDATIONS 
1.  Recommendations 
Over the past 8 months, the Rapid Strategic Review Group have met to review the current
service, the immediate plans for expansion and the future vision for Hospital at Home in
line with Scotland’s national strategy and the following recommendations are proposed:
Horizon 1 – timescale 6 months (as part of Winter funding proposal)
 Extend operating hours to include evening and weekend working
 Enhance interfaces between community nursing, hospital based specialities and more
understanding of capabilities across the system. Increased reporting of agreed KPIs
 Increased professional to professional advice via consultant connect
 Capture learning from Heart Failure Test of Change to inform speciality developments
across the service
 Explore Flow Navigation Centre being the single point of access for escalation and de-
escalation 
Horizon 2 (learning from Winter proposal) – implemented by March 2024
 Refocus on service to admission avoidance
 Clearly define step down criteria for complex cases
 Move from medical delivered model to a medical oversight model
 Rapid access to diagnostics
 Develop and implement recommendations from Heart Failure learning 
Horizon 3 – implement March 2025
 Finalise workforce mode for service
 Connect Hospital at Home to locality teams (urgent response and nursing)
 Agree model for multiple Responsible Medical Officers when the service expands into
other specialties
 Clarify system wide governance arrangements
 Ensure a de-escalation and escalation framework is in place
 ANPs undertaking differential diagnosis 
A structure to support the implementation of the recommendations is required and a group
will be established to oversee these strategic developments. The work will also continue
to be connected into the Operation Flow programme. An MDT approach will be essential
to support  the  implementation  of the  new  model, incorporating disciplines such as
pharmacy, physio, mental health and social work.

Page 14

14 
Appendix 3 
REFERRAL DATA 
REFERRALS TAKEN TO DATE 2023 = 1590 
AVERAGE REFERRALS TAKEN PER MONTH 2023 = 265 
Hub Apr May Jun Jul Aug Sep Total
Hairmyres 61 70 68 63 67 66 395
Monklands 75 84 94 70 96 90 509
Stepdown 47 54 48 43 43 38 273
Wishaw 69 63 70 73 69 69 413
Grand Total 252 271 280 249 275 263 1590 
2022 VS 2023
Patient
Increase  % Increase
6 10%
8 11%
10 28%
20 40%
44 20% 
AVERAGE REFERRALS 
SITE  2022/23  2023/24
Hairmyres 60 66
Monklands 77 85
Stepdown 36 46
Wishaw 49 69
Grand Total 221 265 
H@H Referral per Hub, 2023/24
120 
100 
80 
60 
40 
20 
0
Hairmyres
Monklands
Stepdown
Wishaw
Apr
61
75
47
69
May
70
84
54
63
Jun
68
94
48
70
Jul
63
70
43
73
Aug
67
96
43
69
Sep
66
90
38
69
NO
REFERRALS

Page 15

15 
LOS 2023/24
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
AVERAGE LENGTH OF STAY 
2023 AVERAGE LOS = 5.99 DAYS 
0.00 April May June July August September Grand Total
Hairmyres 8.38 5.71 7.79 7.67 8.42 7.18 7.50
Monklands 3.95 3.96 4.51 5.19 4.83 4.87 4.55
Stepdown 4.06 3.37 3.75 3.58 3.40 4.89 3.81
Wishaw 8.83 7.17 8.16 7.01 8.17 7.28 7.77
Grand Total 6.38 5.04 6.09 6.07 6.32 6.08 5.99 
AVERAGE LOS PER SITE  
2021/22  2022/23  2023/24
Hairmyres 8.02 7.4 7.50
Monklands 6.01 5.7 4.55
Stepdown 5.77 5.5 3.81
Wishaw 10.48 9.3 7.77
Grand Total 7.44 6.91 5.99 
2021 VS 2023
Reduction in
days
%
Reduction
0.52 7%
1.46 24%
1.96 34%
2.71 26%
1.45 19% 
2022 VS 2023
Reduction in
days
%
Reduction
-0.11 -1%
1.10 19%
1.71 31%
1.50 16%
0.91 13% 
2021 VS 2022
Reduction
in days
%
Reduction
0.63 8%
0.36 6%
0.25 4%
1.21 12%
0.54 7% 
DAYS

Page 16

16 
REFERRAL SOURCE 2023 
Referral Source Apr May Jun Jul Aug Sep Total
A&E 32 31 19 21 13 24 140
Clinic 1 1 2   1 5
ConsultantConnect 1 2 1 2 1 3 10
DN    2 1  3
ECU 1 2 1 2 2 1 9
GP 162 166 200 157 191 170 1046
Nurse 1 1
SAS 8 12 7 17 17 23 84
Ward 47 56 50 48 50 41 292
Grand Total 252 271 280 249 275 263 1590 
CAREHOME PATIENTS 
Carehome
Patients
Apr May Jun Jul Aug Sep Total
Hairmyres 12 12 9 11 11 12 67
Monklands 2 4 2 5 8 4 25
Stepdown    2 6 2 10
Wishaw 1 3 2 1 1 6 14
Grand Total 15 19 13 19 26 24 116 
BED COMPLEMENT 
Bed Complement Apr May Jun Jul Aug Sep
Hairmyres 24 24 24 24 24 24
Cardiology     3 3
Monklands 24 24 24 24 24 24
Stepdown 12 12 12 12 12 12
Clydesdale 12
Wishaw 24 24 24 24 24 24
Grand Total 84 84 84 84 87 99

Page 17

17 
WORKFORCE DATA 2023 
Month FE In Post Vacancy
Rate
Vacancy
(WTE)
Employee
Headcount
Total
Leaver
s WTE
Total
Leavers
12Mths
Rolling 12
Mths
Turnover
Sick Leave %
September 42.44 45.21 (6.53%) (2.77) 48 0.0 0 0.00% 4.79%
August 42.44 40.65 4.22% 1.79 43 0.0 0 0.00% 7.29%
July 37.93 39.26 (3.51%) (1.33) 42 0.0 0 0.00% 15.88%
June 37.93 39.26 (3.51%) (1.33) 42 0.0 0 0.00% 7.80%
May 37.93 38.26 (0.87%) (.33) 41 0.0 0 0.00% 7.63%
April 37.93 37.26 1.77% .67 40 0.0 0 0.00% 9.62% 
2023  39.43  39.98  (1.40%)  (.55)  42.67  0.0  0 0.00%  8.83%  
Average           
 The team have been fully established for the entirety of 2023, with no staff having left the
service and a turnover rate of zero.
 The only vacancy being for the newly developed Cardiology team in August while we
awaited a start date.
 All recruitment campaigns have been highly successful
 The Clydesdale was formed and began operational activity on 28th August, this data will
follow
 Sickness Absence is managed well within the policy

Page 18

18 
Appendix 4 
Chief Operating Officer, NHS Scotland Directorate 
Deputy Chief Operating Officer: Performance and Delivery Division 
To: Chief Executives
IJB Chief Officers
CC: COO NHS Scotland 
14th November 2023
Dear Jann,
ADDITIONAL FUNDING TO SUPPORT HOSPITAL AT HOME EXPANSION 2023-24 
Thank you for recent work to identify your Health Board’s ability to mobilise additional virtual
capacity to support resilience over winter. This letter sets out additional funding which should
be utilised to develop the services set out in your submission with a focus on reducing hospital
admissions and maximising capacity. 
I am pleased to tell you that Scottish Ministers have approved the allocation below which is
based on your return which set out the additional capacity which could be created by the end
of this financial year. 
Board Additional
beds
Indicative Funding
23/24
NHS Lanarkshire 60+ £ 1,274 ,685 
Funding will be released at the end of this financial year based on delivery and monthly
evidence of the impact it is having to ease system pressures and improve the experience of
services users. This funding is provided for the current financial year only. If an underspend
is expected to arise as compared to the costs outlined above, this must be notified to us as
soon as possible. The funds should be used entirely for the purpose outlined in your
submission and should not be top sliced or used for any other purpose. 
Considering current service pressures NHS Boards, particularly those facing the greatest
challenges, should continue to consider what additional initiatives, within the hospital at home
programme, can be evidenced and rapidly stood up if support was available. You should notify
the Unscheduled Care Policy team where this is the case. 
Future Arrangements 
For Hospital at Home to be effective and to ensure Boards progress at pace, we recognise
that funding must be provided on a recurring basis at full year costs. This will help ensure the
ongoing sustainability of new services in pressurised boards and to reduce the risks of services

Page 19

19 
folding or failing to start due to ongoing funding concerns. We will work with you over the
coming months to understand the recurring element of your funding. Until the 2024-25 Budget
is approved we cannot confirm future year or recurring funding. 
The biggest risk to expansion of hospital at home services is whether sustainable workforce
models can be developed. Mitigation of this risk requires a concurrent focus on developing a
sustainable workforce model across all disciplines. The Scottish Government will work
organisations including NES and HIS to ensure effective governance and oversight is in place
and based on best practice. 
Governance 
Expansion of virtual capacity so far has been overseen by the Hospital at Home Expert
Working Group chaired by Graham Ellis, Deputy Chief Medical Officer. This group will now
cease and will be replaced by a Programme Delivery Board within Scottish Government,
supported by operational support within the Centre for Sustainable Delivery (CfSD) as lead
agency and in close collaboration with other National and territorial boards. This group will
support the delivery of the wider Hospital at Home expansion across a range of specialties,
supporting shared learning and collaborative working across Health Boards. 
As confirmation of receipt and acceptance of this funding envelope, please provide us with the
name of the nominated representative for your board to attend the Programme Delivery Board.
You may wish to name 2 people to ensure operational and clinical representation. 
Performance monitoring and Reporting 
It is essential that early evaluation is in place to assess how well the virtual capacity is
delivering and to ensure the funding delivers value for money and services are safe,
consistent, efficient, and person-centred. NHS Boards are asked to consider what local
service evaluation can be put in place to support this. 
Reporting will be requested on the first Monday of every month from 4 December and should
be sent to the Unscheduled Care Team UnscheduledCareTeam@gov.scot A template has
been provided in Annex A. 
Please contact the Unscheduled Care team if you require any further information.
Yours sincerely,
The Unscheduled Care Policy Team 
MONTHLY HOSPITAL AT HOME SUBMISSION 
HB Named Representative:
Submitted by (if different to above):
Contact: Hazel Mitchell
Board: Lanarkshire
Date: 04/12/2023
ANNEX A

Page 20

20 
Complete and return by 1st Monday of every month. 
Trajectory of additional bed numbers by March (as
provided to Scottish Government)
Hospital at
Home
pathway 
Nov  Dec  Jan  Feb  Mar
Older People 12 24 36 48 48
Heart Failure    12 12
OPAT / / / / /
Paeds tbc tbc tbc tbc tbc
Other (please
specify) / / / / /
Total    60+ 60+ 
Current actual number of additional beds
Hospital at
Home
pathway 
Nov*  Dec*  Jan  Feb  Mar
Older People 0 12 12  
Heart Failure     
OPAT     
Paeds     
Other (please
specify)     
Total 0 12 12  
*Please note November & December has been amended to accurately reflect the additional beds as opposed
to total beds previously reported. 
What progress has been made in the last month in increasing virtual capacity?
Include details on whether you remain on trajectory and any issues impacting on
agreed deliverables and whether you remain on track to spend funding.
Active recruitment process has been on-going since September to help enable us to
fulfil this expansion plan. The temporary funding of the posts has deterred
candidates from taking up these roles and this has made the expansion challenging.
We have failed to recruit the Band 6 Practitioners and Band 4 Assistant
Practitioners due to the temporary posts not being an attractive option. Successful
recruitment does includes3wte Band 7 Trainee ANPs and a Band 8a Senior ANP.

Page 21

21 
This cohort of staff are due to take up post mid-January so will hopefully help
bolster capacity into February once the induction programme has been followed. 
Notwithstanding the issue of not having any additional Practitioner staff in post,
utilising additional excess and bank hours for the past 2 months have allowed us to
increase capacity by 12 beds. 
Additional Senior medical staff have been utilised on a sessional basis, although
this arrangement is temporary and not a long term sustainable plan. In terms of
Junior doctors, 3 locums have been recruited on short term contracts via Agency.
How are you ensuring virtual beds are being fully utilised? Please include data that
evidences how beds are being utilised?
Increased capacity is evidenced below by number of referrals accepted by team: 
*Please note October & November data has been revised and accurately recorded above, previous
submission was inaccurately reported 
As the table above shows patient referrals accepted by the team have increased
since October. The table below shows that December saw a 13% increase in
patients accepted into the service. Also as December had less working days due to
Public Holidays, this is actually a 25% increase in true terms of daily referrals. 
The additionality of the Junior Doctors in place to support the Senior clinical
decision maker has allowed the service to accept additional patients, and enabled
more virtual working, hence allowing the Wishaw & Clydesdale hubs to accept more
referrals than previous months. 
The Acuity of the patients we have managed has increased with patients presenting
as much sicker and frailer than the months prior, however this is consistent with the
expectation of what we would expect in winter months, when frailty and co-
morbidities make patients more vulnerable.
Team October* November* December
Hairmyres 63 82 70
Monklands 95 100 99
Wishaw 66 58 69
Clydesdale 11 18 30
Stepdown 40 47 44  
Total Referrals   275   305   312   
Analysis October November December
Increase in referrals since expansion ‐ 30 37
Increase in referrals since expansion (%) ‐ 11% 13%
Average referrals per day 12.50 13.86 15.60
% Increase daily referrals ‐ 11% 25%

Page 22

22 
What impact are you seeing on acute capacity, e.g., admissions, length of stay,
occupancy?
Increased admission rates have helped support the Acute sites winter plan and
helped minimise their challenges wth patient flow and reduce delayed discharges
by keeping patients with POC in their own homes. 
The average LOS in 23/24 for NHSL H@H patients was 6.08 days prior to expansion.
As mentioned above the acuity of patients in November/December has increased
and this has a consequential impact on the LOS, which has risen to an average of
7.02 days for December 2023. Without additional funding and the additional medical
staff and excess/bank nursing hours it would not have been possible to manage
these sick patients and increase referral rates. 
December referrals of 312 x average LOS of 7.02 days = 2190 Acute bed days saved
Any further information (please note any further information around concerns or
impact such as patient and staff feedback / experience)
Patient feedback has been very positive as is the expectation in our service as we
strive to give excellent patient centred care at all times.