REPORT 
Item No: 11 
SUBJECT: Performance Update – Quarter 1 (April – June 2023) 
TO: IJB Performance, Finance & Audit Committee
Lead Officer
for Report:
Morag Dendy, Head of Planning, Performance and Quality Assurance 
Author(s) of
Report
Stephen Forrest, Performance Manager
DATE: 18th October 2023 
1. PURPOSE OF REPORT 
This paper is coming to the IJB for: 
For approval ☐ For endorsement ☐ To note ☒ 
2. ROUTE TO THE BOARD 
This paper has been: 
Prepared By: ☒ Reviewed By: ☒ Endorsed By: ☐
Prepared by:      
Performance Manager 
Reviewed by: 
Senior Manager, Strategy
& Performance   
3. RECOMMENDATIONS
It is recommended that the IJB/IJB PFA Committee:
(1) Note the contents of the report and the appendix.

Page 2

2 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
The Chief Officer has joint quarterly performance review meetings with the Chief Executives
of NHS Lanarkshire and North Lanarkshire Council. These meetings are supported by a
Chief Executives Performance Framework, comprising a range of performance measures
taken from across both the health and social work systems, including relevant targets and
trajectories for the measures presented. 
Each quarter there are areas for improvement identified within the performance framework;
these are identified using a RAG rating and those measures that are flagged as Red or
Amber are subject to improvement or corrective action. The performance review meetings
are used as a means for jointly agreeing these actions. 
6. CONCLUSIONS
The areas for improvement and corrective action are attached as Appendix 1. The areas for
improvement identified in Appendix 1 are being progressed as a matter of priority, and
progress updates will be reported at future meetings of the Board and the Performance,
Finance & Audit Committee.  
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing and live
in good health for longer 
☒
People, including those with disabilities or long-term conditions, or who are frail,
are able to live, as far as reasonable practicable, independently and at home or in
a homely setting in their community
☒
People who use Health and Social Care Services have positive experiences of
those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or improve
the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the work
they do and are supported to continuously improve the information, support, care
and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and Social
Care Services 
☒
Yes  ☐ No ☐ N/A ☒

Page 3

3 
7.2 ASSOCIATED MEASURE(S)
None.
7.3 FINANCIAL
This paper has been reviewed by Finance: 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register Details  Current Risk Level  Risk Owner 
IJB 11.21 - Oversight of
Performance Activity
Low Ross McGuffie
NHSL 2014 -
Recovery of Performance 2021/22
Very High NHSL Corporate
NLC RIA0000460 –
Performance & planning
High NLC – Social  Work/Social care 
7.5  ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of work
and provide further details regarding the engagement and participation that was undertaken.
Objectives  Further Details 
☐ Involve stakeholders in the development work
aimed at achieving the national 
outcomes 
☐ Provide stakeholders with information on how
to get involved 
☐ Ensure a diverse range of engagement and
participation and opportunities are in 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☐ Provide regular feedback on how stakeholder
engagement and participation is 
shaping and influencing service development
and delivery 
☒ Provide support to enable stakeholder
representatives to participate meaningfully and
confidently at meetings
The performance information, with the
corresponding improvement and
corrective actions will enable
stakeholder representatives to
participate in wider discussion about
performance.
☐ Develop participation guidelines to ensure a
common understanding and set of 
Yes  ☐ No ☐ N/A ☒

Page 4

4 
expectations for both stakeholders and
partnership staff
☒ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
The performance information, with the
corresponding improvement and
corrective actions supports locality
planning. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and attached to
report: 
EQIA added to website: 
8. BACKGROUND PAPERS
None.
9. APPENDICES
Appendix OneAreas for Improvement (Quarter 1, April – June 2023) 
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Head of Planning, Performance and Quality Assurance 
Members seeking further information about any aspect of this report, please contact the
following;
Stephen Forrest – Performance Manager Stephen.Forrest@lanarkshire.scot.nhs.uk  
Yes  ☐ No ☐ N/A ☒
Yes /
Date
added 
☐ No ☐ N/A ☒

Page 5

5 
Appendix One 
Appendix One– Areas for Improvement (Quarter 1, April – June 2023) 
1.  Alcohol Brief Interventions  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Alcohol Brief Interventions North  4072 292 718  
Alcohol Brief Interventions (all settings) NHSL  7381 647 1098  
Narrative & Corrective Action 
The Scottish Government (SG) and Public Health Scotland (PHS) have confirmed that the NHS Lanarkshire annual ABI target is to remain at 7381 for
2023/24. To reflect structural and organisational changes, the Information Services team have completed a mapping exercise detailing the teams in their
localities, which allows for the provision of agreed trajectories for each locality and the many teams who contribute toward achieving the overall target
number of ABI. This will allow for local scrutiny of performance by service managers at their team meetings. 
A SOP for recording ABIs on each of the recording systems has been finalised and will be disseminated to localities and teams by Service Managers.
An evaluation of the training provided to community staff has been shared with the Steering Group and the recommendations are now being considered
as it will not be possible to implement them fully within the current level of resource available. 
2.  Cervical Screening  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Cervical Screening  80% 72.5% 72.3%  
Narrative & Corrective Action 
Analysis was carried out using MiLan data to understand the cervical screening uptake across Lanarkshire.  The chart below shows the uptake for North
Lanarkshire Council by locality for quarter 1.   No locality achieved the recommended target of 80%.

Page 6

6 
Data analysed from MiLan for the time period 1st April 2023 – June 2023 – Quarter 1 
Data for cervical screening is available at a practice level. Of the 50 GP practices in North Lanarkshire, only 3 GP practices achieved the national target of
80% in Quarter 1.  The breakdown by locality is provided below.
 Airdrie (6 practices) – no practices achieved the 80% uptake target 
 Bellshill (9 practices) – no practices achieved the 80% uptake target 
 Coatbridge (6 practices) – no practices achieved 80% uptake target 
 Motherwell (6 practices) – 1 practice achieved above 80% uptake target 
 North (12 practices) – 2 practices achieved 80% or above 
 Wishaw (11 practices) – no practices achieved the 80% uptake target 
Health Improvement Activity
Information Provision/Communications
62.0%
64.0%
66.0%
68.0%
70.0%
72.0%
74.0%
76.0%
78.0%
80.0%
82.0%
Airdrie Bellshill Coatbridge Motherwell North Wishaw
2023 Locality Uptake 
by Quarter
2023 Quarter 1
Jan - March
2023 Target

Page 7

7 
 Information was circulated to partners as part of Cervical Screening Awareness Week (19th-24th Jun) to support awareness raising and informed
choices. 
 Two Cancer and Screening Inequalities Workshops were delivered by Health Improvement. This includes cervical cancer and screening information;
these sessions are available to staff and organisations across North Lanarkshire. 
 Community Engagement.
o Two community projects were appointed through the VANL commission process in June 2023. These were appointed to deliver a 12-month
programme of activity in North Lanarkshire, specifically Airdrie and Bellshill, using a community development approach to improve awareness
and engagement with the national cervical and breast screening programme.
 Airdrie – Bear Necessities:  A project manager will work with local women’s community groups and settings where women already
attend to explore barriers to attending screening, and to raise awareness around cervical and breast screening. Engagement with
primary care to support women attend cervical screening will be offered. Existing links with Airdrie Action Partnership and Airdrie
Consortium will be used to extend the reach of the work.
Bellshill – Culture Junction: A community arts approach delivering workshops and pop up events, empowering women to discuss their thoughts around
their bodies, to address any fears, shame or stigmas they may face when accessing cancer screening, or fears, shame or stigma more generally. Using
creative engagement approaches e.g., creative writing, arts and craft, to engage women on the topic, and to provide a safe, relaxed environment to share
stories, learn from one another and gain confidence to access their screening. In addition, a focus group will be supported to create a resource for women. 
3.  Child Immunisations Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Immunisations – %s of 5 year olds 95% 92.2% 91.4%  
Narrative & Corrective Action 
The Community Nursing Management Team are carrying out further analysis of DNA at a locality level to try and determine whether there are patterns, or
trends at the level of localities that might increase the organisational intelligence around non-attendance. It should be noted that regardless, in each
instance of DNA, there is an appropriate and proportionate action plan for each child following up on that non-attendance.
The intelligence gained through previous analysis has identified that more novel and focussed approaches may be desirable, and the team is looking at
how home immunisations and “pop-up” immunisation clinics might improve performance in the areas of highest non-attendance.
This is supported by the findings of a self-assessment by the Immunisation Inclusivity Group and Dr Henry Prempeh, who conducted a session around nine
thematic areas (local insights, eligible population, reminders/recall, catch-up activity, declines/opt-outs, delivery models, inclusion activity, marketing and

Page 8

8 
communications and workforce education) to better understand the performance and what improvements might be found. The findings of this review will
inform future improvement activity. 
It should be noted that there are known anomalous aspects of the data held regarding childhood immunisations; for example, where a child has had all
immunisations except MMR due to choice, the calculation for this metric may return that case as the child having had no immunisations. Work is ongoing
to address these issues, with further development of SIRS and Morse recording practices to ensure accurate performance data is produced and published. 
4.  6-8 Week Reviews Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Percentage of people who have completed 6-8
week review 90% 71.1%
Quarterly/ 1
quarter
behind
 
Narrative & Corrective Action 
An SBAR has been prepared detailing recommendations for improvements to the Universal Health Visiting Pathway (UHVP) and the Child Health
Surveillance Programme Pre-School system (CHSP-PS). One of the drivers for this work is the level of performance in this area; the PHS monthly reporting
indicates that completion of the 6 to 8-week assessment by 10 weeks of age is consistently below 75% across North Lanarkshire. 6-8 week assessments
are not being undertaken in the required timescales and are not being delivered consistently across NHS Lanarkshire.
UHVP is a minimum standard for core home visiting offered to all families consisting of 11 home visits; 8 within the first year of life and 5 Child Health
Reviews between birth and starting school. CHSP-PS supports the delivery of the child health programme by facilitating the automated call and recall of
children for the agreed schedule of child health reviews for pre-school children. Both programmes are evidence based and agreed best practice.
The visit at 6 to 8-week review is a home visit that is in addition but complimentary to the review undertaken by General Practitioners (GP) at 8 weeks in
the surgery or clinic. Completion and return of the Child Health Surveillance Programme form is the joint responsibility of the GP and Health Visitor
(depending on local arrangements) and the review form should be completed fully and accurately then promptly returned to the local child health
department for timely data entry into the CHSP-PS.
Quality control and validation is in place to ensure the accuracy of data, however this does result in situations where records or forms identified as
requiring further attention not being captured in reporting, therefore there is often incomplete reporting for this metric, or misleading performance
information.
An in-depth review was carried out by each Health Visiting Team Leader for children born within their localities between October 2022 and December
2022; the review used a case-study approach for 6-8 week reviews that were thought either not to have taken place, or information had not been
received by the Child Health Department for recording into the CHSP-PS. These cases were reviewed for accuracy and any trends or common themes for

Page 9

9 
those cases. The results are summarised in the table below; 82% of babies identified within the time frame did receive a full HV/GP assessment, of those
39% were out with the timeframe: 
The overall findings highlighted that the paper-based system that is in place is not easy to navigate, nor does it allow for ease of monitoring at a local level.
The review found that implementing an electronic system would reduce the risk of lost information, avoid confusion and provide a clear monitoring
system. The SCAR concludes with the following recommendations:
 The implementation of a CHSP forms as part of an electronic system would reduce dependency on paper assessment sheets and reduce the
duplication of forms, provide assurance that assessments were being completed and ensure prompt return. It would allow for easier monitoring
of what was completed/outstanding.   
 Develop a Standard Operating Procedure to ensure 6-8 week assessments are completed within agreed timescales and completed forms are
promptly returned to the local child health department for timely data entry into the Child Health Surveillance Programme Pre-School system
(CHSP-PS). 
Wishaw  Motherwell Bellshill North Coatbridge Airdrie Total %
No. on List 21 24 22 45 13 27 152 
No. completed
by HV
21 22 21 45 12 27 148 97%
No. with full HV
and GP review
within
timescales
14 10 7 21  4 9 65 43%
No who had a
late review/or
no full GP/HV
Review
Late: 4
No: 3 
Late: 9
No: 5
Late: 8
No: 7*
*1 child not
discharged from
hospital 
Late: 24
No: 0
Late: 6
No: 3
Late: 8
No: 10
Late:59
No: 28
39%
18%

Page 10

10 
 Remind Health Visitors and GP’s/CHS clinics of the tight timescales for completion to ensure assessments are completed timeously. 
 Ensure outcome of assessments shared – GP should be returning HV part of form to the Health Visitor for information.
 Health Visiting Teams to follow the journey of the 6 to 8-week Assessment form to ensure process is followed.
 Ensure GP Practices and CHS clinics have enough appointments to accommodate demand for assessments so that there is assurance that they will
be completed within approved timescales.
 Once both HV and GP assessments are completed this should be recorded as a significant event in the child’s Health Visiting record.
The SBAR is being considered through the service’s internal governance before proceeding to implementation of the recommendations. 
5.  Reablement and rehabilitation services  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Reablement - Number Of People Completing
Reablement Process
2000 (500 per
quarter)  1418 376  
Reablement - % Of New or Increased Home Support
Packages Which Are Reablement 70% 61.20% 64.00%  
Reablement - % Of People With No or Reduced
Home Support Service Required At End Of Process 70% 28.80% 21.30%  
Balance Of Care - % Of People (Age 65+) 45% 42.60% 40.20%  
IEAS - % Deliveries Achieved Within 7 Working Days
Quarterly 80% 51.50% 47.50%  
Narrative & Corrective Action 
It is widely acknowledged that Reablement support provided within North Lanarkshire produces good outcomes for service users completing the
Reablement process, however further consideration of performance in this area has highlighted clear recording issues in some localities and teams. In
essence, Reablement demand and support is not always being recorded appropriately, with both Cumbernauld and Airdrie identified as not accurately
reporting Reablement progress, and there is an undoubted subsequent impact on the data for these performance metrics.
The service is now experiencing a delay in Home Support Teams moving service users off of Reablement if it has been identified that a provider may be
required for ongoing support should the locality teams not have the resource required. This is mainly due to the directive that an indicative budget
requires to be approved and agreed before a service user can be allocated to a provider via the SDS model of support. This is impacting on locality teams
taking on additional cases for Reablement.

Page 11

11 
All Reablement teams are highlighting the lack of Occupational Therapy support to Reablement received from each of the locality teams; prior to the
creation of IRT, Occupational Therapists worked in partnership with Home Support Reablement teams, with joint screening meetings and home visits
accepted practice. All locality teams are reporting that this support is now limited due to the demands on IRT.
Locality SDM’s have highlighted the significant and sustained vacancies in Reablement teams that are unable to be filled, particularly Home Support
Worker vacancies. This is in part due to the current cap on recruitment, which is restricting the number of service users who can be supported at any given
time via the Reablement process.
The expansion of the Home Assessment Team (HAT) and the HAT approach continues to impact on the wider system. The number of referrals per month
to HAT continued to increase until March 2023, where it appears to have plateaued and then subsequently reduced in July 2023. 
The largest input service for HAT is Home Support (65% of referrals received), followed by O.T. (49%).  Both of these figures have remained constant since
the start of the service.

Page 12

12 
846 people were noted as completing HAT, 85% of the total referrals. The locality with the largest number of people recorded at completion stage was
Wishaw. Of the 304 showing further service being required, the service with the highest number was C.A.S. with 131 (15% of total completing).
With regard to IEAS, a Programme of improvement works is still in progress, with improvements to premises and focussed recruitment activity in progress
at the time of reporting. Sustained workforce challenges, specifically recruitment and retention of suitably skilled and experienced IEAS staff have resulted
in challenges with the delivery and uplift of equipment. 
6.  Delayed Discharges  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Delayed discharge bed days - standard delays 31,796 8,178 8,438  
Narrative & Corrective Action 
For 2023/24, North Lanarkshire HSCP has set a target to reduce the 2022/23 target for number of delayed discharge bed days for standard delays by 5%.
This is on top of the 10% reduction target in the previous year. During April – July 2022/23, cumulatively, there were 1527 more delayed discharge
standard bed days than trajectory – 11,234 against the target of 9,797. 
Input
SW 4%
OT 49%
Physio 17%
AHP Support Staff 9%
Home Support 65%
CAS 24%
Technology 4%
Pharmacy 3%
Com. Nursing Team 10%
Med. Realignment 2%
Service at Completion
HS - Reablement 9%
HS - Mainstream 13%
IRT - Physio 7%
IRT - OT 11%
Rehabilitation - Other 1%
CAS 15%
Locality SW Referral 1%
IDS 1%
LSS 1%
District Nurse 7%
NL Leisure 1%
Third Sector 4%

Page 13

13 
Standard Bed Days against trajectory
Figures 6 and 7 show that North Lanarkshire performance has improved on the July census date and was below the national average for the rate of
delayed discharge for the entire adult population and >75. 
Lower
is
better

Page 14

14 
Rate Per 100,000 Over 18s    
Rate Per 100,000 Over 75s*
The work initially being undertaken as part of the ‘Discharge Without Delay’ programme is now being subsumed within Operation Flow and should see
improvement across a number of areas which will assist in improving patient flow through the hospital which, in turn, will assist significantly in reducing
delayed discharges. Through the use of accurate Planned Date of Discharge (PDD), early involvement of social work staff in discharge planning and an
associated reduction in ‘unplanned referrals’, so the number and time associated with delayed discharges should improve.

Page 15

15 
Recently reported work associated with ‘Discharge without Delay’ and associated developments to support earlier discharge and potential admission
avoidance are anticipated to assist in bringing further improvements in this position. Throughout July, above 94% of all patients from North Lanarkshire
were discharged without delay (target 98%). 
All inpatient discharges 
In the middle of the month of July patients aged 65+ with a Planned Date of Discharge (PDD) was 61%. Unplanned referrals peaked at 41% in the first
week of July. 
Discussion is ongoing with acute colleagues in seeking to support improvements in these areas such that there is sufficient time to plan discharges and
therefore reduce the level of subsequent delay. Work includes the provision of dedicated social work support to ward-based Multidisciplinary Team
reviews with an aim of improving the number of people with PDDs and accuracy of same.

Page 16

16 
Current Inpatients (at time of census) with a Planned Date of Discharge

Page 17

17 
Current Inpatients (at time of census) with a SW referral that is unplanned
Factors affecting performance include:
 Recent challenges with increases in sickness absence levels in in-house Home Support services 
 Continued reduced capacity of Reablement services 
 Recruitment and retention to posts at all grades in Home Support has been challenging and there has been a higher than usual turnover. In
particular Home Support Worker, Support Officer and Service Delivery Coordinators have been difficult to recruit and retain. 
 Highest referral rates on record – w/b 16th January, the North partnership received 158 referrals (peak winter pre-pandemic average was 77)
A wide range of activity is underway, both locally and nationally, to drive further improvement in performance, these include:
 Whole system improvement work on the PDD process, including development of PDD metrics for inclusion in future reports
 Home Support recruitment

Page 18

18 
 Lanarkshire is a demonstrator site for Home First/Discharge without delay. Staff involved in the development of the Discharge without delay
measurement plan 
 Rapid response, focused on supporting people at home, is having an impact. Home Assessment Teams are now up and running with over 660
individuals now supported home since May 2022. 60% of individuals the Home Assessment Team has worked with required no further support or
service at the end of the process. Further work is ongoing to accelerate the implementation of Home Assessment Teams across all localities.  
 Expanding Hospital at Home service and considering expanding to under 65s
 Additional CSWs are being recruited so that District Nursing Teams can enhance the care offering to those on both Home Support and District
Nursing caseloads, freeing up further Home Support capacity to concentrate on other cases
 New approach to interim care home placements introduced in December 2022. 
 Establishment of additional review capacity to free up mainstream Home Support service 
Efforts continue to ensure Reablement capacity within the service is protected with Reablement and rehabilitation key priorities for the future of the
operating model. 
7.  CAMHS  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
18 Week RTT Performance – CAMHS NHSL (NORTH
HOSTED) 90% 28.7% 28.1%  
Narrative & Corrective Action 
The Waiting List Initiative has continued to evidence a steady downward trajectory in children and young people who are waiting to be seen. This, in
collaboration with the delivery of increased capacity for initial assessment (Choice Appointment), is evidencing regular incremental monthly reductions in
the waiting list and the longest waits. A regular weekly meeting is in place that will continue to focus on longest waits, as well as the distribution of choice
and partnership appointments being offered. The service has currently paused the additional capacity being offered for Choice appointments (initial
assessment). The service has assured itself that Choice appointment capacity is embedded in the CAPA booking process and this will continue to be
scrutinised to ensure it is maintaining capacity against demand.

Page 19

19 
It is likely that the WLI will need to flex to provide the additional capacity required to address ongoing challenges around the RTT target. Work is ongoing
with CAMHS Clinical Managers and Team Coordinators to ensure CAPA partnership appointment capacity is maximised across the whole system. There
has been a drop off in RTT performance in Q1; this was anticipated due to the increased activity through waiting list initiative and it expected that there
will not be significant improvement in RTT in Q2. This is due to a culmination of higher levels of DNA due to school holidays and staff annual leave;
however, the weekly focus on longest waits, CAPA appointments and additional out-of-hours capacity should start to realise a consistent positive
trajectory in future quarters. 
8.  Adult Mental Health  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Consultant Outpatient WT - Adult Mental Health -
12wks (NHSL) (NORTH HOSTED) 90% 63.5% 57.4%  
Narrative & Corrective Action 
Psychiatry performance continues to be impacted by significant challenges around the recruitment and retention of Consultants, which is a national issue.
Performance in this area is subject of the MH & LD Risk Register.
Sustained levels of high demand and recovery works focussed on those patients waiting the longest have seen improvements in the longest waits.

Page 20

20 
The service continues to focus improvement activity on improving current staffing levels and retaining staff through personal development and training
opportunities. 
9.  Medical Paediatrics  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
Medical Paediatrics WT - 12 wks (NHSL) (NORTH
HOSTED) 90% 49.2% 49.5%  
Narrative & Corrective Action 
The Paediatric Modernisation Board has been established. A preliminary workshop followed by the first meeting of new Board has taken place. It is
chaired by AMD for NLHSP and reports directly to Head of Health who has responsibility for delivery of the ongoing improvements required to assure
future service models. Membership and agreed TOR now in place. Programme of work identified. A Horizon 1- 3 approach is being taken. Initial Work
Streams have now been established. These include: -
 Care Assurance Work Stream- Chaired by AND for Children and Young People Services.
 Rota Sustainability
 Continence Service Model review (which has a big impact on community paediatric waiting times)
There continues to be robust vetting of all referrals into General and Paediatric services and some recovery of waiting time is being achieved. However,
there are increasing numbers of referrals being sent to the department so impact of what is being delivered has not yet balanced and will require further
scope of capacity and demand to evidence the growth ask beyond current resource. This will be a focus of Paediatric Modernisation Board as we consider
and progress new sustainable models of working.
Performance for July shows 45.3% with 802 children waiting over 12 weeks. Longest wait is 51 weeks.

Page 21

21 
10.  Paediatrics – Speech and Language Therapies  Target 2022/23 2022/23 Q4 2023/24 Q1 Performance
Compared to
Previous
Quarter
Performance
Compared to
Same Quarter
Previous Year
RAG
Status
SLT - Paediatrics - 12wks (NORTH HOSTED) 90% 39.4% 25.1%  
Narrative & Corrective Action 
Speech and Language Therapy continues to face significant challenges to meet the waiting times target. A service improvement plan is in progress and the
management team have been provided with additional support to implement the improvements. A service improvement workshop and subsequent
process mapping session was facilitated by a project lead and service improvement colleague; these colleagues are providing ongoing dedicated support
for the improvement work. There are now six discreet areas of improvement work: -
1. Communication and Engagement - SLT colleagues already have a dedicated website and share many support materials via YouTube. This work
stream will be led by NHS Communications Team and supported by the SCHSU Engagement Officer to ensure voices of children, young people and
family are considered within this process.
2. Waiting List - The Team are not consistently using Trakcare across their full system. This makes it difficult for them to apply consistent waiting time
measurement processes across the service. Service Improvement and Waiting List Management colleagues have been involved in supporting
improvement work in this area.
3. Accommodation - The Team are based across several community bases and are also on acute sites. A review will be undertaken of currently
allocated space with a particular focus on appropriate capacity of clinical rooms to meet clinical demand.
4. HR and Workforce - The team are similar to many areas within healthcare; recruitment and retention is an important area of focus due to
difficulties recruiting, training and retaining suitable skilled and experienced staff. This work will be supported by NHS Lanarkshire HR and
workforce colleagues. Scoping will be undertaken of the workforce demography to ensure we are building a sustainable future model for
workforce and service delivery. This will include considered expansion of non-registered roles with the input of further education partners, who

Page 22

22 
are involved in supporting the work; it is hoped that their inclusion in workforce planning will support increased partnership working and sharing
of experience that will be mutually beneficial. 
5. Administration - Currently the OSM workforce is managed across 2 separate OSP portfolios. The administration group will focus on scoping of
tasks against current capacity and demand, as well as insuring that both OSM’s are kept informed of developments that may affect their teams.
eHealth - eHealth colleagues will lead this group and develop a plan of improvement. The initial focus will be testing the current Trakcare build and
expanding this to all parts of service. Thereafter, the focus will be on ensuring all people being seen by SLT will have their care and interventions
documented on Morse, so that they can inform shared working with other colleagues involved in direct care.

Page 23

23 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements

Page 24

24 
11 Date direction will be
reviewed