1 
REPORT 
Item No: 10 
SUBJECT: Quality Assurance Annual Report
TO: Integration Joint Board
Lead Officer
for Report:
Maria Williamson, (Acting) Head of Performance, Planning & Quality
Assurance
Author(s) of
Report 
Elaine McIntyre, Service Manager, Quality Assurance
DATE: 27 September 2023 
1. PURPOSE OF REPORT 
This paper is coming to the IJB for: 
For approval ☐ For endorsement ☒ To note ☐ 
2. ROUTE TO THE BOARD 
This paper has been: 
Prepared By:
Elaine McIntyre,
Service Manager,
Quality
Assurance 
☒ Reviewed By:
Maria Williamson,
(Acting) Head of
Performance,
Planning & Quality
Assurance 
☒ Endorsed By:
Adult Care and
Social Work
Committee 
☒

Page 2

2 
3. RECOMMENDATIONS
The Integration Joint Board is asked to endorse the contents of the report. 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1  Quality Assurance have a wide and varied function including monitoring and
evaluating key aspects of social work practice and performance. A central activity is
the on-going contract monitoring of external social care providers. The environment
in which we operate currently is complex and sharing of best practice and solution
focused ideas are integral to ensure the people of North Lanarkshire receive good
quality support to help meet their outcomes.
5.2 Our commitment is to provide an annual report on activity carried out in the preceding
year.
5.3 This report highlights Quality Assurance activity over the period 1 April 22 to 31 March
23 and covers Contracts & Contract Management, Regulatory Activity, Procurement,
Complaints, Duty of Candour, Information Governance, Communications, Adult
Support & Protection, In House Monitoring, Participation & Engagement, Carer
Developments and Risk Management.
5.4 Full detail of these activities is included in Appendix A. 
Contracts 
5.5 The Quality Assurance Team work cohesively with Corporate Procurement
colleagues to implement robust contract arrangements, which balance quality against
cost, to achieve overall Best Value for services provided to vulnerable people living in
North Lanarkshire. A range of organisations are commissioned through a variety of
arrangements and a methodical and systematic approach has been developed,
resulting in 95% of services purchased by social work now having contractual
agreements in place with clearly defined terms and conditions. These agreements
range from national framework arrangements to individual service agreements. 
Contract Management Framework 
5.6  All organisations from whom North Lanarkshire Council social work purchase services
are required to adhere to contract monitoring arrangements. Quality Assurance have
Yes  ☐ No ☒ N/A ☐

Page 3

3 
a key role in the application of these arrangements to ensure that the terms and
conditions of the contract are met. Information gathered from contract monitoring also
informs continuous strategic planning and commissioning, improvement identification
and enables early intervention and support should difficulties in providing and
sustaining services become apparent.
5.7 During this reporting period the Contract Management Framework has been refined
following evaluation. As a result, some of the processes and procedures have been
amended to enhance performance reporting, data collection and the overall
experience. The agreed changes are effective from 1 April 2023.
Regulatory Activity
5.8 Care Inspection activity during the reporting period of 2022/23 was spread across all
key questions within North Lanarkshire older people’s care homes. North
Lanarkshire care homes performance measures slightly lower than Scotland wide
care homes in that 55.6% of grades of 4 and above were awarded. Scotland wide
care homes achieved 63.9% of grades of 4 and above.
5.9 During the reporting period 52 SDS contractors were inspected. 45 contractors were
awarded grades of good (4) and above. This is a percentage of 86.5%, which
reflects delivery of high-quality care and support across SDS contractors supporting
people in North Lanarkshire.
In House Monitoring
5.10 The Quality Assurance team have been working on the development of an In-House
Monitoring Framework during 2022/23. The suite of documents included within this
Framework are awaiting approval from the Senior Leadership Team.  
Market Facilitation
5.11 Our approach to market facilitation means we are responsive to the changing needs
and aspirations of people living in North Lanarkshire, whilst also reflecting the
changing social care landscape.
5.12 One of the biggest challenges currently, is the lack of capacity available to choose
from when a care and support package is required. There are many factors
contributing to these challenges, including workforce retention and recruitment, cost
of living increases, increased demand, complexity of support required and quality of
care falling below expected standards. Quality Assurance continue to liaise with
internal and external partners to identify solutions to the challenges.
Procurement
5.13 In collaboration with Corporate Procurement colleagues and Locality Social Work
Teams, Quality Assurance assist in the planning, coordination, and implementation
of processes to ensure that when contracting new or existing work, the
requirements of the Procurement Reform Scotland Act 2014 and the Procurement
(Scotland) Regulations 2016 are adhered to. By doing so there can be confidence
that the care & support services commissioned are legal, safe and outcomes
focused whilst demonstrating Best Value.

Page 4

4 
Fair Work
5.14 In 2021/22, we reported that most contractors had indicated they were either
already accredited as or were willing to become Scottish Living Wage employers.
This year 100% of providers on our Self-Directed Support including Care at Home
framework, reported paying the Scottish living Wage.   
Complaints
5.15 Quality Assurance retains an overview role in terms of complaints made about
Social Work service provision. Regular quarterly reports on complaints activity are
reported through our governance structures. The annual summary and analysis of
complaints received over the period 2022/23 is available at appendix 1.
Duty of Candour
5.16 Duty of Candour is a statutory duty on Scottish organisations providing health and
social care. The responsibility is to remain open and honest when something goes
wrong, that is not related to the course of the condition for which the person is
receiving care. An annual report capturing Duty of Candour activity is available is
attached as appendix 2. 
6. CONCLUSIONS 
n/a  
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☐
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒

Page 5

5 
7.2 ASSOCIATED MEASURE(S) 
None.
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
There are no direct financial impacts in relation to this report. 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Choose an item. 
Risks are identified and reported on via the relevant risk register. 
7.5  ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of work
and provide further details regarding the engagement and participation that was
undertaken.
Objectives  Further Details 
☐ Involve stakeholders in the development
work aimed at achieving the national 
outcomes 
☐ Provide stakeholders with information on
how to get involved 
☐ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☐ Provide regular feedback on how
stakeholder engagement and participation is 
shaping and influencing service
development and delivery 
Yes  ☐ No ☐ N/A ☒

Page 6

6 
☐ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings 
☐ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff 
☐ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership 
Residents across North Lanarkshire who access services, their families/carers and the
community, third and independent providers operating in North Lanarkshire and wider
stakeholders with a link to North Lanarkshire. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and attached to
report: 
EQIA added to website: 
Fairer Scotland – As part of the council’s commitment to Fair Work and social works drive
to adopt an ethical commissioning approach, Fair Work practices have been embedded in
procurement processes to ensure contractors are paying the Scottish Living Wage and are
committed to providing community benefits.
Equality Impacts are considered as part of procurement and contract monitoring. 
8. BACKGROUND PAPERS  
N/A
Yes  ☒ No ☐ N/A ☐
Yes /
Date
added 
☐ No ☐ N/A ☒

Page 7

7 
9. APPENDICES
9.1 Appendix A: Quality Assurance Annual Report 2022/23.
9.2 Quality Assurance Annual Report 2022/23 - Appendix 1Complaints
9.3 Quality Assurance Annual Report 2022/23 - Appendix 2Duty of Candour 
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact the
following; Maria Williamson: (Acting) Head of Performance, Planning and Quality
Assurance)  WilliamsonM@northlan.gov.uk

Page 8

8 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed

Page 9

9 
Appendix A 
Quality Assurance Annual
Report 2022/23

Page 10

10 
1. Introduction
Quality Assurance have a wide and varied function including monitoring and evaluating key aspects of
social work practice and performance. A central activity is the on-going contract monitoring of external
social care providers. The environment in which we operate currently is complex and sharing of best
practice and solution focused ideas are integral to ensure the people of North Lanarkshire receive good
quality support to help meet their outcomes.
The Quality Assurance Team work collaboratively with our internal Health and Social Care Partnership
colleagues and with external stakeholders to ensure the delivery of services that are underpinned by
human rights, inclusion, achieving potential, choice and control. The activities reported in this 2022/23
annual report reflects the commitment to a creative and dynamic approach that helps reduce resource
barriers and promotes good outcomes for people.
Our priorities are directed towards the Scottish Government’s nine national health and wellbeing
outcomes, the ambitions of the Plan for North Lanarkshire and the Strategic Commissioning Plan.
This report outlines activity over the period 1 April 22 to 31 March 23 and includes updates on our work
in the areas of Contracts & Contract Management, Regulatory Activity, Procurement, Complaints, Duty
of Candour, Information Governance, Communications, Adult Support & Protection, In House
Monitoring, Participation & Engagement, Carer Developments and Risk Management.
2. Contracts
The Quality Assurance Team work cohesively with the Corporate Procurement colleagues to implement
robust contract arrangements, which balance quality against cost, to achieve overall Best Value for
services provided to vulnerable people living in North Lanarkshire. A range of organisations are
commissioned through a variety of arrangements and a methodical and systematic approach has been
developed, resulting in 95% of services purchased by social work now having contractual agreements in
place with clearly defined terms and conditions. These agreements range from national framework
arrangements to individual service agreements.
Tables 2a and 2b below illustrate graphically the extent of the work that has been carried out in engaging
with providers from the community & voluntary sector, the independent sector and private contractors
in a proportionate and balanced way to ensure service provision is provided safely and is of a high quality
throughout the team of the contract. As of 31 March 23, 95% of all social work spend had the provision
of a formal contracting arrangement. This is an increase from 93%, reported in year 2021/22. Work is in
progress for the remaining 5%, which are awaiting formalisation of Individual Service Agreements.
Quality Assurance continue to progress with the necessary arrangements to ensure all spend has robust
contractual and legal agreements in place; however, it should be noted that due to the fluidity of
contracting and commissioning, achievement of 100% compliance may not always be possible.

Page 11

11 
Table 2a 
Table 2b 
We currently purchase services from 305 different provider organisations, which is a slight increase of 2
from 2021/22 when we reported purchasing services from 303 provider organisations. The biggest shift
to note is in the number of providers operating as part of our Self-Directed Support, including Care at
Home Framework, which has increased to 61 providers from 52 reported 2021/22. It is anticipated that
this increase on the SDS Framework will create greater capacity with more choice available to people
who access services.
3. Contract Management Framework (CMF)
All organisations from whom North Lanarkshire Council social work purchase services are required to
adhere to contract monitoring arrangements. Quality Assurance have a key role in the application of
these arrangements to ensure that the terms and conditions of the contract are met. Information
gathered from contract monitoring also informs continuous strategic planning and commissioning,
improvement identification and enables early intervention and support should difficulties in providing
and sustaining services become apparent.
160
14
0
12
0
10
Spread of Contractors 2022/2023 
148 
61 
28  
7 4  9 3 11 2 3 5 1 6 13 4

Page 12

12 
North Lanarkshire Council value the services delivered by contractors and Quality Assurance Senior
Officers link closely with contractors to establish transparent and honest relationships, through the
application of regular monitoring activity as agreed within the Contract Management Framework.
During this reporting period the Contract Management Framework has been refined following
evaluation. Following consultation through workshops and provider forums, feedback from Quality
Assurance Senior Officers and commissioned social care contractors was collated on the various tools
within the Framework. As a result, some of the processes and procedures have been amended to
enhance performance reporting, data collection and the overall experience. Consideration was also
given to the resource implications for social care contractors; therefore, the revised approach has been
streamlined to avoid duplicate reporting where possible.
The agreed changes effective from 1st April 2023 are listed below: -
 The development of a Participation and Engagement Toolkit to support the inclusion of direct
stakeholder feedback and engagement by Senior Officers, as part of Contract Monitoring
arrangements. Contractors are central to the method of engagement implemented by Senior
Officers to ensure feedback is collated in a person centred, responsive and flexible way. A 5%
sample of people using the service being monitored has been defined.
 Creation of Key Performance Indicators to inform sampling areas during monitoring visits by
Senior Officers. A monitoring report will ensue with a copy being provided to the contractor.
 Enhanced financial monitoring of block funded services.
 Modifications to qualitative and quantitative data being requested from contractors on a
quarterly basis including reporting on notifiable and non-notifiable accidents and incidents
and the achievement of supported people meeting outcomes.
 Addition of a ‘purple’ tier rating for if there is an on-going Large-Scale Investigation or there is
significant risk of closure in the immediate 6-month period (See Table 3a)
 Risk rating criteria changed on Monitoring Prioritisation Assessment to better reflect level of
monitoring activity required in turn effectively targeting resources.
The Monitoring Prioritisation Assessment (MPA) is the key component of the Contract Management
Framework. The MPA is the up-to-date position statement on the performance of commissioned
contractors. The processes of monitoring and the accompanying report build evidence of real time
accessible information regarding the quality-of-service provision, performance and outcomes over the
life of a contract/framework.
Table 3a – MPA Tier Levels & Monitoring Frequency 
STATUS INDICATED MONITORING LEVEL
Purple Large Scale Investigation (LSI) or
Service Closure Processes that are
imminent within 6 months 
Red Significant concerns in relation to
service performance, contract
compliance.
TIER 4
Contract monitoring visit frequency – 1 to 4 weekly.
Amber (high) Moderate concerns in relation to
service performance, contract
compliance
TIER 3
Contract monitoring visit frequency – variable, at least
quarterly but no more than monthly.
Amber (low) Minor concerns identified in
relation to service performance
and contract compliance
TIER 2
Contract monitoring visit frequency – variable, at least
bi-annually but no more than quarterly.

Page 13

13 
Green Service performance, contract
compliance and engagement are
satisfactory.
TIER 1
Contract monitoring visit frequency – annually in most
cases.
Each Tier suggests a minimum monitoring frequency (Table 3a). The basis of monitoring considers the
commitments made by the contractor as part of their agreement with the Council including, but not
limited to, Standard Terms and Conditions, Data Protection Terms and Conditions, Special Terms and
Conditions, commitments made in relation to Fair Work Practices and Community Benefits and relevant
national standards.
Table 3b below highlights Tier Levels for the reporting period 2021/22 and for the reporting period
2022/23. It is positive to see that Tier 1 services had increased from 72% to 85%. Due to the increase all
other tiers show a reduction. Despite this, contractors continue to face increasing demands due to
workforce recruitment and retention issues, higher level of Care Inspectorate scrutiny and challenges
with financial sustainability. Contractor’s have reported the benefit from the monitoring role of Senior
Officers and the early interventions and solutions offered.
Table 3b 
4. Regulatory Activity
Care Inspection activity during the reporting period of 2022/23 was spread across all key questions
within adult and older people’s care homes. Key Question “How good is our care and support during the
COVID 19 pandemic” was embedded into the Key Question “How well do we support people’s wellbeing”
by the Care Inspectorate. However, care homes for children and young people and school care
accommodation continued with the COVID specific key question included within their specific Care
Inspectorate quality framework. This is reflected in Table 4a whereby 5 care homes were inspected in
this area. 4 care homes were awarded grades of 4 (Good) and 1 care home was awarded a grade of 3
(Adequate). Table 4b shows 83 Care Inspections assessing Key Question “How good is our care and
support during the COVID 19 pandemic” haven taken place across Scotland and from this most care
homes were awarded grades of adequate (3) and good (4) highlighting an equivalent position to North
Lanarkshire.

Page 14

14 
Care Inspection Grades - North Lanarkshire
Based Care
Homes As At 31/03/2023
16
14
12
10 How good
is
Table 4a below details an analysis of the key question “How well do we support people’s wellbeing”. The
data has been extracted from Tables 4b and 4c below. North Lanarkshire Care Homes performance
measures slightly lower than Scotland wide care homes in that 55.6% of grades of 4 and above were
awarded. Scotland wider care homes achieved 63.9% of grades of 4 and above.
Table 4a 
How well do we support
people’s wellbeing
Number of Care
Homes Assessed
Grades Awarded Percentage
North Lanarkshire Care Homes
(Table 4b)
27 0 x Excellent 4 x
Very Good 11 x
Good
10 x Adequate
2 x Weak
0 x Unsatisfactory
0%
14.8%
40.8%
37%
7.4%
0%
Scotland Wide Care Homes
(Table 4c)
97 3 - Excellent 23 x Very
Good
36 x Good
33 x Adequate
2 x Weak
0 x Unsatisfactory
3.1%
23.7%
37.1%
34%
2.1%
0% 
Care Homes in North Lanarkshire:
2 care homes were the subject of Large-Scale Investigations, under Adult Support and Protection
legislation, with significant support provided by the Care Inspectorate and Senior Council Officers to
address and improve quality improvement measures. Although there have been short term
improvements there is little evidence of these improvements being sustained over a longer timeframe.
Continuous monitoring and intensive engagement with each of these care homes continues.
Table 4b 
How well do
we support
people's
wellbeing?
How good is
our
leadership?
How good is
our staff
team? 
How good is
our setting?
How well is
care and
support
planned?
our care and
support
during the
COVID-19
pandemic?
Adequate 2022/2023 10 5 5 3 4 1
Good 2022/2023 11 15 10 6 8 4
Very Good 2022/2023 4 1 1 3 0 0
Weak 2022/2023 2 1 0 0 2 0

Page 15

15 
During the reporting period 2021/22, 14 out of 22 care homes were assessed as adequate for the key
question “How well do we support people’s wellbeing”. This was 66.6% in comparison to the reporting
period 2022/23 when adequate grades achieved under the same key question were 37%. This change
highlights a significantly improved overview of the quality of care being provided with 55.5% of grades
being higher than adequate.
Care Homes in Scotland (excluding North Lanarkshire):
North Lanarkshire Council currently has people placed within 148 care homes that are located
elsewhere in Scotland. North Lanarkshire Council retains care management responsibilities for the
people living in out of authority care homes. The host authority where the care home is geographically
located is responsible for care home contract monitoring, however, not all local authorities operate in
the same way. The Quality Assurance Team receives regular updates from host authority contacts in
relation to out of authority care homes.
Table 4c 
Self-Directed Support (SDS) including Care at Home:
Prior to the pandemic, the Care Inspectorate changed their quality inspection themes for registered
services. It was reported in 2021/22 that this was fully implemented for Care Homes and some self-
directed support contractors, but 40 SDS contractors were still to be inspected using the new themes as
of 31 March 22. Although there remain some self-directed support contractors who have not been
inspected using the new quality framework, the majority have now been inspected. Table 4d below
illustrates activity.

Page 16

16 
Care Inspection Grades- Self Directed Support
including Care
20 18    16    14 12 10    8 6 4 2 0
How
How
How good 
Table 4d 
well do
we
support
people's
wellbein
g?
How
good is
our
leaders
hip?
How
good is
our staff
team?
How
good is
our
setting?
well is
care
and
support
planned
?
our care
and
support
during
the
COVID- 
Care &
Support 
Environ
ment  Staffing
Manage
ment &
Leaders
hip     
19…    
Adequate 2022/2023 7 7 2 0 3 0 0 0 0 0
Excellent 2022/2023 1 0 0 0 0 0 3 0 0 1
Good 2022/2023 8 9 5 1 4 0 3 0 3 8
Very Good 2022/2023 11 6 3 1 3 0 19 1 9 10
Weak 2022/2023 0 0 1 0 0 0 0 0 0 0 
From the 52 SDS contractors that have been inspected, 45 have been awarded grades of good (4) and
above. This is a percentage of 86.5%, which reflects delivery of high-quality care and support across SDS
contractors supporting people in North Lanarkshire.
It should be noted that the percentage above is calculated from the grades awarded under “How well do
we support people’s wellbeing” and Care and Support, reflecting the two different inspection
methodologies.
5. In House Monitoring
During this reporting period the Quality Assurance team have been working on the development of an
In-House Monitoring Framework. The suite of documents included within this Framework are awaiting
approval from the Senior Leadership Team and it is intended that a test of change across Home Care
services will commence in August 2023. This test of change will inform any further refinements and
modifications prior to roll out across all In House services including Locality Support services, Children’s
Houses, and Integrated Day Services.
The aim of the In-House Monitoring Framework is to support implementation of best practice and a
culture of continuous improvement. Progress on the implementation will be reported in future reports.
6. Market Facilitation
Sustainability arrangements remined in place to ensure social care services continued to operate in a
financially secure and viable manner following the impact of the COVID pandemic. The criteria for which

Page 17

17 
Social Care Providers were reimbursed was phased out gradually, with the arrangements ending on 31st
March 2023. However, due to contractors reporting significant increases in their costs., there continues
to be a requirement to provide support and guidance to ensure they remain financially sustainable, to
enable the continuation of service delivery across the authority.

Page 18

18 
We recognise that services provided by external organisations make an important contribution to our
ability to offer choice in supporting the health and well-being of people who use social care services.
Therefore, our approach to market facilitation means we are responsive to the changing needs and
aspirations of people living in North Lanarkshire, whilst also reflecting the changing social care
landscape.
One of the biggest challenges currently, is the lack of capacity available to choose from when a care and
support package is required. There are many factors contributing to these challenges, including
workforce retention and recruitment, cost of living increases, increased demand, complexity of support
required and quality of care falling below expected standards. Quality Assurance continue to liaise with
internal and external partners to identify solutions to the challenges.
Provider Recruitment Event – A co-designed large -scale recruitment event is planned to be held in April
2023 to promote the sector and attract and encourage new people to work within social care. The event
will support our commissioned contractors to recruit suitable staff and in turn maximise their capacity
to provide care to the people of North Lanarkshire.
Building Capacity – A programme of activity to build capacity across the sector enabled us to work with
providers over two phases. This approach was in recognition of the pressures contractors face due to
ongoing recruitment and retention issues across the social care sector. Through non-recurring funding
from the Scottish Government, proposals were invited from contractors on the Self-Directed Support
including Care at Home Framework, to build capacity and upskill staff teams to support our communities
across North Lanarkshire. 40 proposals were submitted to be considered, including requests to support
recruitment drives, staff training and development, incentives including joining bonuses, driving lessons
and IT investments.
7. Carer Developments
To ensure robust and ongoing support for Carers, we have, in conjunction with South Lanarkshire
Council and Lanarkshire Carers, developed a Joint Partnership Statement to build on existing trust and
partnership working between the named organisations. It provides a common reference point; useful to
guide collaboration on a daily basis, avoid confusion and provide clarity as and when required.
The agreement supports mutual understanding and expectations between partners (Lanarkshire Carers;
North Lanarkshire Social Work and South Lanarkshire Social Work) in relation to the delivery of Adult
Carer Support Plans (ACSPs). The roles, responsibilities and boundaries of all partners are defined and
agreed. The agreement also provides a staff information and awareness raising tool and ensures that
carers have access to accurate information and are signposted and referred appropriately.
8. Participation and Engagement
There is a strong history of engagement and participation within North Lanarkshire. To strengthen our
approach and progress our next Participation and Engagement Strategy, over the reporting period we
have proactively linked with a range of key stakeholders to explore options and agree a model that
ensures supported people, including underrepresented groups or communities, can play as active a role
as they choose, in helping shape services. This approach ensures that supports and services are
informed and led by people with lived and/or relevant experience of support, and that policy and
strategy reflects the views, wishes, needs and aspirations of supported people.

Page 19

19 
9. Communications
To actively promote services and support for people, we have been working with the Communications
Manager to develop a robust communication plan that provides clear and timely information, provides
easy access to publications, showcases good news stories and promotes the sector.
Members of the quality assurance team have undergone training to enable them to populate the
revised Health and Social Care North Lanarkshire website: https://hscnl.org.uk/ 
Development of this website will be continuous and additional resources will continue to be made available.
10. Information Governance
Our Information Governance Framework enables the safe and secure use of sensitive and other
information to support the health and wellbeing of the people across our communities. It ensures that
we meet our legal and ethical duties in relation to handling and managing information to a high
standard. The role of Quality Assurance in information governance includes, but is not limited to:
1. Advice, monitoring and supporting the processing of:
 Subject access requests (SARs) including Information Commissioner’s Office (ICO)
reviews and complaints.
 FOISA (Freedom of information requests) including Scottish Information Commissioner
reviews and complaints.
 GDPR breach notifications
 Data protection impact assessments (DPIAs)
 DSAs/ISAs and data protection terms and conditions in contracts
 Schedule 2 requests for information relating to criminal activity (usually from the
police)
 Work with other services to support the information governance function for social
work (risk assessments, legal data protection team, legal FOI team). 
2. Manage and support:
 Corporate reporting of KPIs for Information Governance
 HSCNL contributions to the Corporate Data Management Team (DMT)
 HSCNL contributions to the Lanarkshire Data Sharing Partnership (LDSP)
 Development and maintenance of recording and reporting systems for information
governance.
 Development and review of policies and procedures for information governance, both
for social work and corporately via DMT. 
The Information Governance function in social work has undergone significant changes over the
reporting year. Many of these changes have contributed to the improvement of how we process
information requests and the reporting functions. Activities have included the following: - 
 Development of a core group within Quality Assurance to support and maintain the
functions of information governance.
 Enhanced promotion of skills and awareness of information governance within social
work, including training of staff and awareness of the online mandatory training
courses and development of service specific training in Subject Access Requests (SAR’s)
 Development of additional training for social work staff.
 Review and update of Subject Access Requests (SAR’s) recording systems.

Page 20

20 
 Review and update of GDPR breach notification process. 
11. Procurement
In collaboration with Corporate Procurement colleagues and Locality Social Work Teams, Quality
Assurance assist in the planning, coordination, and implementation of processes to ensure that when
contracting new or existing work, the requirements of the Procurement Reform Scotland Act 2014 and
the Procurement (Scotland) Regulations 2016 are adhered to. By doing so there can be confidence that
the care & support services commissioned are legal, safe and outcomes focused whilst demonstrating
Best Value.
Throughout 2022/23 this partnership approach has enabled our Commercial Pipeline to be further
developed. Transparency is a fundamental principle of public procurement, helping to ensure best value
and proper scrutiny of contract awards. The Commercial Pipeline brings valuable insight to support the
planning and delivery of public procurements, whilst enabling the widest possible- population of
potential suppliers to be sighted on upcoming public sector contracting opportunities. 
Further refinements have also been made to our Contract Mobilisation processes, to embed timescales
and key stages from the award of contracts to contracts going live. Over the period, we have focused
on stakeholder communication plans, regular implementation meetings and the roles and
responsibilities of key social work staff throughout the term of contracts, which are integral to effective
service delivery. This approach helps to minimise contract implementation delays & barriers and
promotes effective partnership working and the achievement of successful outcomes for the people of
North Lanarkshire. 
We have also introduced the inclusion of Contract Exit Strategies and defined this within the contracting
terms and conditions. This approach will ensure clarity when terminating contracts during their term (if
required), contracts coming to a natural end and contracts at risk of early termination. This improved
guidance is helpful during the period when provider sustainability features on the Social Work Risk
Register. 
Early in 2023 there was representation from Quality Assurance to support the Corporate Procurement
team at Lanarkshire’s Meet the “Real” Buyer Exhibitor. This event enabled potential contractors to ask
specific care related questions. There were 337 attendees on the day and the feedback from the supply
base was very positive. Representation from the Quality Assurance team will attend future events. 
Quality Assurance leads on procurement activity for all social work services, including those focussed on
children, families, justice services and adults. There are close links between departments to ensure joined
up planning, clear procurement processes and subsequent contract monitoring arrangements.

Page 21

21 
Table 11 describes a sample of procurement activity undertaken in 2022/23. 
Table 11 
Contract Comments and Benefits
Flexible Framework for Self-
Directed Support and Care at
Home Services
 £900M value, 10 years, will result in less frequent re-tenders.
 follows the ‘Light Touch Regime’ / Regulation 74 of PCSR2015
 Annual entry and exit points for Contractors currently in Year
3
 Secured an increase in the number of contracted providers,
improving the choice and control for supported people
Flexible Framework for Non-
Traditional Respite
 £4M, 10-year agreement, will result in less frequent re-
tenders.
 follows the ‘Light Touch Regime’ / Regulation 74 of PCSR2015
 Covers an existing gap within National ‘Respite’ Frameworks
 Annual entry and exit points for Contractors currently in Year
2
 Secured an increase in the number of contracted providers,
improving the choice and control for supported people
Digital Counselling Service and
Online Platform of Support
 £120,000 funding had been allocated from within Scottish
Government’s Mental Health Services allocation to the
Council to pay for the solution in year 1.
 Follows the ‘Light Touch Regime’ / Regulation 74 of PCSR2015
 Anticipate that further years funding can be secured should
the solution prove to be successful.
Counselling Service for Care
Experienced Young
 Funding available year 1 via Scottish Government (initial year
£50k) subject to annual review. Options years included to give
option to extend agreement.
 Follows the ‘Light Touch Regime’ / Regulation 74 of PCSR2015
 Based within Intensive Services Hub, Cecil Street, Coatbridge
and work with 16–25-year-olds who have experienced trauma
and adversity.
Lifelong Links  £8000 plus VAT for the first year. Proposal for Funding
 Children in local authority care including children in residential
care and care leavers
ADL SmartCare  £291,268.92 whole life budget over 4 years. (£71,041.20)
 GCloud 13, cloud software solutions
 GCloud 13 allows searching of software solutions.
Hoists and Adaptations  £12,000,000 whole life budget over 5 years.
 Split into Lot 1 and Lot 2
 Supply, Installation, Removal and Servicing of Straight and
Curved Stairlifts
 Supply, Installation, Removal, Servicing and Maintenance of
Ceiling Track Hoists

Page 22

22 
12. Fair Work
The Fair Work Convention has been in place since April 2015 and acts as an independent advisory body to
Scottish Ministers. The Convention’s vision is that by 2025, people in Scotland will have a world leading
working life where fair work drives success, wellbeing and prosperity for individuals, businesses,
organisations and society.
As part of the council’s commitment to Fair Work and our ambition to adopt an ethical commissioning
approach, Fair Work practices have been embedded in procurement processes to ensure contractors
are paying the Scottish Living Wage and are committed to providing community benefits. Tracking
Contractor progress has been included in the Social Work Contract Management Framework.
Contractors report on community benefits activity and Scottish Living Wage compliance. The
information provided contributes to the overall assessment of contract compliance.
Community Benefits - During 2022/23 Quality Assurance increased focus on the delivery of community
benefits, following new contract awards and implementation. Our approach means link senior officers
meet with contractors to review, promote and encourage new initiatives that offer employment to
people in the local community, youth training and training for people from disadvantaged groups,
traineeships, apprenticeships, and volunteering opportunities.
Scottish Living Wage - In 2021/22, we reported that most contractors had indicated they were either
already accredited as or were willing to become Scottish Living Wage employers. This year 100% of
providers on our Self-Directed Support including Care at Home framework, reported paying the Scottish
living Wage. Across all contractors of commissioned services, 94% are now paying employees the
Scottish Living Wage. The remaining 6% of contractors provide non-care related services or are within
the cross-border category whereby the Scottish Living Wage does not apply.
Table 12 
13. Children, Families and Justice
Quality Assurance monitors most Children’s Services where a contract status has been secured either on
an Individual Placement basis or as part of a Framework Agreement, generally through Scotland Excel.
Contractors Paying Scottish Living Wage 
6%

Page 23

23 
Improved links and processes in joint working between Quality Assurance and Children & Families mean
that the noted development areas reported in 2021/22 have been progressed and all children and
young people placements are conveyed to the appropriate teams.
Quality Assurance have been supporting the development of Children, Families and Justice risk
management arrangements, whereby attendance at the Social Work Risk Forums and membership of
same is promoted across these teams. The Governance arrangements for Children and Families risk
arrangements have been defined within the Adult Health and Social Care Risk Management Local
Strategy.
14. Complaints
Quality Assurance retains an overview role in terms of complaints made about Social Work service
provision. Regular quarterly reports on complaints activity are reported through our governance
structures.
The annual summary and analysis of complaints received over the period 2022/23 is attached as
appendix 1.
15. Duty of Candour
Duty of Candour is a statutory duty on Scottish organisations providing health and social care. The
responsibility is to remain open and honest when something goes wrong, that is not related to the
course of the condition for which the person is receiving care. An annual report capturing Duty of
Candour activity is a requirement of the Council and the report for 2022/23 is attached as appendix 2.
16. Adult Support & Protection
The lead for Adult Support and Protection sits within the Adult Headquarters Social Work team;
however, Quality Assurance have a key function to monitor the performance of social care contractors
including care homes, so we work closely with our Adult colleagues. Adult Support & Protection activity
can highlight patterns/trends and/or contract compliance concerns. Maintaining an overview allows for
early intervention and support for contractors if required. A Senior Officer from Quality Assurance is
identified as the Adult Support & Protection Link Person, which supports robust monitoring.
Quality Assurance have representation on the Pan Lan Adult Support & Protection Care Home Task
Group. The aim of this group is to identify and respond to feedback and address any inconsistencies that
may arise in key messages being communicated by various professionals in relation to when an ASP
referral should be made to the Local Authority. Adult Support & Protection Coordinators from North
and South Lanarkshire Council and representation from both the Care Inspectorate and Scottish Care also
participate in this group. To ensure a co-produced and partnership approach, a nominated care home
manager participates the views of the wider care home population.
Work is ongoing to support care home managers to have confidence in their decisions about when to
make an ASP referral. We continue to promote attendance and participation with contractors, in North
Lanarkshire Council Adult Support and Protection training.
17. Adult Health & Social Care Risk Management
There is a nominated Risk Champion and depute for Adult Health & Social Care, as we all as range of
risk facilitators across the service. A key function over the past months has been the implementation

Page 24

24 
of the new Corporate Risk Management Strategy and the associated Adult Health and Social Care Risk
Management Strategy.
Significant progress has been made to update the risk register for Adult Health & Social Care. Quality
Assurance have taken a lead role in coordinating the reviews of risks in partnership with risk owners.
Throughout the reporting year several Risk Forums and a Risk Identification meeting have taken place.
The current membership of the Risk Forum is under review at this time.
Work continues to review individual risks, wordings and assessment to ensure they are clearly
articulated in a way that means identification of controls and actions is more focussed and meaningful.
18. Quality Assurance Planned Developments 2023/24
There are several developments in progress or planned for the period 2023/24, which will be conveyed
in future reports. Details of some of the planned developments are noted below:
 Roll out of In-House Monitoring
 Social Work Self Evaluation
 Chief Social Work Officer Report
 Quality Assurance Newsletter
 Review of Contract Management Framework & associated data analysis
 Development of Engagement & Participation Strategy
 Establish membership of Risk Forum & streamline current risks.
 Ethical Commissioning Self-Assessment & Action Plan
 Recommence Care Home Provider Forum
 Support Succession Planning
 Refine Induction Pack
 Establish systems around Contractor Capacity Reporting
 Embed the role of Locality Senior Officer Links
 Agree and implement post covid care home arrangements/forums.
 Further development of market facilitation plan
 Continued Large Scale Investigation involvement. 
This report has covered Quality Assurance activity undertaken during the period 1 April 2022 to 31
March 2023 and highlights progress made in key activities noted in the last reporting period. The
additional resource of two Senior Officers to the team in January 2023 has had a positive impact on
outcomes achieved in developing creative and solution focused approaches to performance and
compliance both internally and externally.

Page 25

25 
Appendix 1 
Social Work Complaints
Annual Report 2022/23

Page 26

26 
Introduction
This report provides an overview of Social Work’s performance in terms of handling complaints received
between 1 April 2022 and 31 March 2023 and covers Adults and Education, Families & Justice. This report
describes how complaints have been managed by social work services, details the number and nature of
complaints received during the year and demonstrates our commitment to learning and improvement.
There remained a residual effect of the Covid 19 pandemic in terms of the numbers of complaints
received in 2022-2023, underlining the impact this unprecedented global event had upon service
provision and the lives of those who use our services.
Complaint activity
Overall, complaint activity rose by 81% from 2021-2022. A significant increase: however, complaints are
still slightly less than they were pre-pandemic. In terms of complaints per population, they stand at 0.35
per 1000.
Overall complaints received for the reporting period were 221, an increase of 99 [58%] from former
reporting period. A breakdown is provided below.
Education and Families
81 complaints were received in relation to Education & Families services this year, 49 received last year,
an increase of 32 [65%]. The chart below is a summary of locality complaint activity for Education and
Families services. 
Of the 81 complaints received, 80 were assigned. One complaint couldn’t be assigned to any locality or
service due to lack of information.
Adult Social Work Services
140 complaints for adult services this year, 73 received last year, an increase of 67 [92%]. The chart
below is a summary of locality complaint activity for Adult Social Work Services.
16
14
12
10
8
6
4
2
Locality/Service 
15 
11 
10
6 6 6 5 4 4
2 1 1 0
Airdrie Bellshill Coatbridge Cumbernauld Motherwell Wishaw
HQ

Page 27

27 
Complaint Process
We always aim to provide the highest possible quality of service across our communities and are
committed to ensuring accountability and transparency. We recognise there are times when we get
things wrong and fail to meet the expectations of those who use our services. We welcome feedback as
it provides information that helps us to learn from complaints and shape and improve the way services
are delivered. Complaints are viewed as a positive communication tool and are actively encouraged.
As per the Scottish Public Services Ombudsman [SPSO] definition, we regard a complaint as any
expression of dissatisfaction, by one or more members of the public, about our action or lack of action, or
about the standard of service provided by us or on our behalf.
Anyone can make a complaint, either verbally or in writing, face to-face, by phone, letter or email.
People are directed and encouraged to use the North Lanarkshire Council online portal to make a
complaint but retain the right to use any of the aforesaid options.
A two-stage statutory social work complaints process was introduced on 1 April 2017, which harmonised
complaint handling processes across all council services. The process is as follows:
• Stage one – ‘frontline resolution’: we will always try to resolve complaints quickly, within five
working days, and in exceptional circumstances extend for a further five days.
• Stage two – ‘investigation’: if people remain dissatisfied with our stage one response, they
can escalate their complaint to stage two. Complaints that are complex or need detailed
investigation from the outset can be looked at immediately at stage two. These complaints will
be acknowledged within three working days and a written response provided within twenty
working days; this can be extended in exceptional circumstances.
Following completion of the complaints process, if the person remains dissatisfied, they can ask the
SPSO to consider their complaint further. We always advise of this entitlement and provide contact
details.
Performance Indicators
The Complaints Standard Authority developed a suite of four mandatory performance indicators in
association with the Local Authority Complaint Handlers Network on which we are represented. These
indicators [undernoted] are a valuable source of information as they help to identify recurring or
Locality/Servic
e 30
25 24 22
20 15
15 12 11 10
10 9 10
6
5 4 5 3 5 4
0
Airdrie Bellshil
l
Coatbridge Cumbernauld Motherwell Wisha
w
H
Q
Stage 1 Stage
2

Page 28

28 
underlying issues, derive/drive learning from complaints and highlight potential areas for
improvement.
 Indicator One: the total number of complaints received.
 Indicator Two: the number and percentage of complaints at each stage that were closed in
full within the set timescales of five and 20 working days.
 Indicator Three: the average time in working days for a full response to complaints at each
stage.
 Indicator Four: the outcome of complaints at each stage. 
Education and Families – Performance Information 
Compliance with statutory timeframes to complete complaint 
23.7% not within timeframes 22.7% not within timeframes 
59.4% within timeframes 54.6% within timeframes
16.9% met with extension 22.7% met with extension 
Average S.1 – 6.2 working days Average S.2 – 23.3 working days

Page 29

29 
Cause of Complaints 
Complaint Outcome

Page 30

30 
Adult Social Work Services– Performance Information 
Compliance with statutory timeframes to complete complaint 
24% not met within timescales 16% not met within timescales 
52% met within timescales 63% met within timescales
24% met with extension 21% met with extension 
Average S.1 – 5.4 working days Average S.2 – 23.2 working days 
Cause of Complaints

Page 31

31 
Complaint Outcome 
Learning from Complaints
The learning from all social work complaints this year have highlighted:
 The importance of good communication.
 The need to ensuring that those who use our services and their carers are informed from the
outset that they may need to contribute towards the cost of their care.
 The need to improving information and advice for those who need to contact and seek support
from social work services.
 That people have the right to use their Self-directed Support (SDS) individual budgets as
creatively as necessary to reach their agreed outcomes, as long as the use of public funds are
legal and do not bring the council into disrepute. 
Outcomes are often specific to the complaint, but when there are organisational learning points that
influence policy or procedure, we need to ensure these are acted upon. Individual learning is dealt
with directly with the complainant and through supervision, and more general issues are managed
through supervision with team members and reminders at team meetings. 
Learning from Complaints 
Communication Safe Driving Conduct
Support Planning Importance of PPE Importance of ID N/A

Page 32

32 
47% of all social work complaints recorded did not highlight any learning, while 33% were attributed to
communication failure as the singular cause of complaints. Other issues cited were safe driving/parking,
wearing appropriate PPE and ID badges, quality of service and conduct of staff.
We recognise the importance of learning from complaints and acknowledge that having a learning
outcome recorded is an area that requires immediate attention. We understand that complaints help
organisations learn more about the experiences of people who use their services, and that complaints
can be helpful to enable us to work in a better way.
At present, learning from complaints is a non-mandatory performance indicator. However, the Scottish
Public Services Ombudsman are interested in the systemic changes that are made following complaints.
Going forward, we will work directly with our central and locality teams to ensure better recording and
learning from complaints is embedded in practice to ensure quality services are delivered.
Comment and compliments
Across social work, seven compliments were made 2022-2023 in relation to complaint handling – all
referred to quick actions by responsive staff to provide resolution. 5 other comments were logged but
were mapped as neutral and non-critical. 
Training
Training on the Dynamics system, where complaints are recorded, is offered as required. The licence
allocation system has recently been reviewed, and licence permissions granted only to management
support team members and to system administrators. Rationalisation of licence holders will increase
opportunities to have closer collaboration and training across the service. Colleagues in Chief
Executive’s office lead on training on system issues, and Quality Assurance Senior Officer leads on
complaint handling training.
The Scottish Public Services Ombudsman offer training on topics such as investigating complaints.
Currently, this is only offered virtually, but there are plans to introduce in person training and to increase
the number of training opportunities offered. We actively encourage participation in training on
complaint handling and management.
Scottish Public Services Ombudsman
The SPSO considered seven complaints of which two are subject to ongoing enquiry, one had
recommendations made for resolution, with the remaining four no actions taken.

Page 33

33 
Child Friendly Complaints Procedure 
The SPSO are introducing a new Child Friendly Complaints Procedure, which will go live on 1 April 2024.
This procedure will ensure that children’s rights under the United Nations on the Rights of the Child
[UNCRC] are met through a child-centred complaint process. Their aim is to co-design and implement a
public sector complaints service that meets children’s rights and needs. They are working in co-
operation with children, young people, public bodies and wider stakeholders. Initially, it was envisaged
that the new procedure would be fully implemented by 1 April 2023. However, following feedback from
engagement and testing work, a more targeted pilot has been agreed. The pilot will focus on key services
provided to children and young people, such as schools, social work services and children’s health
services. The aim of this work will be to test the new approach in practical settings, both to ensure it
results in the right outcomes for children, and that it is efficient, practical, and workable for the public
sector bodies managing the process.
Full guidance on the new process should be made available by summer 2023, with a soft launch of the
new process in April 2024.
Quality Assurance
Quality Assurance senior officers provide training and support to social work managers and teams in
relation to the complaint handling process. A suite of letter templates are available, which provide
guidance on model answers and best practice when engaging with complainants. Complaints are often
routed directly through the Quality Assurance officer who acknowledges receipt and assigns complaints
to the relevant team manager. Guidance on response times and content is provided.
Complaints that relate to both health and social work/social care services are routed through the
relevant lead organisations complaints process, but there is an integrated approach to resolution and
any joint learning outcomes are shared.
Care Opinion
Care Opinion is a non-profit organisation, funded mainly through subscriptions from health and care
organisations. At present, 500 health and social care organisations use Care Opinion across the UK. Care
Opinion have been sharing people’s experiences of health and care services online in Scotland since
2013 and have built a national and international reputation for their innovative and value-led approach
to online feedback.
Feedback is considered integral to quality improvement and for staff it is an opportunity to see the
system and the service provided through the person’s eyes. 
Subscription to Care Opinion gives a further platform for people who use social work services to
comment on the quality of the service that we provide but may also encourage people to make formal
complaints. Usage of Care Opinion has been slow – however, there has been marked increases in
comments posted about social care services over the course of the preceding quarter. Anecdotal
information from our partners in NHS Lanarkshire suggests that in the early stages, uptake can be poor,
but that sustained promotion will drive traction and momentum. There is a Care Opinion
implementation group who meet regularly to agree plans for increased promotion and shared learning
.
To support the use of Care Opinion as a vehicle to promote feedback on services, our revised Contract
Management Framework requires all contracted providers, through their quarterly monitoring return, to
report on their use and promotion of Care Opinion as a method of seeking feedback.

Page 34

34 
Conclusion
The principal cause of complaints continue to identify poor staff communication, staff attitudes and
quality of service. This is further reflected within the learning outcomes, which indicate the need to
improve communication, practice and approach to those using social work services.
As a partnership we are committed to improving learning from complaints which is also one of the key
performance indicators that are reportable to the SPSO. We will, over the course of 2023-2024 place
further emphasis on identifying and applying learning from complaints, recording learning outcomes
and evidencing subsequent improvements.
We will also emphasise the need to ensure that all complaints are dealt with in the identified
timeframes, with clear communication of outcomes. Although 100% of complaints that were sent
directly to social work were acknowledged by the due dates, only 58% overall were completed within
statutory timeframes. Complexity of issues, new processes, staffing, IT systems and very tight time
frames for resolution were the contributory factors in failure to complete all complaints within time.
Improvement in these areas are expected in 2023-2024.
Further actions – 2023-2024
Several key actions have been identified to strengthen our approach when dealing with complaints
including using the learning to improve the quality of experience for those who use our services. The
actions are:
1. We ensure a robust log and learning from complaints is implemented to support the
improvement of services that support people across our communities.
2. We develop a programme of reflective learning sessions across teams - Complaint activity and
learning remains an agenda item in team meetings and links across services and localities are
maintained with Quality Assurance Senior Officer who will review complaint activity as
required.
3. We continue to promote Care Opinion as one of the key mechanisms for engaging with
members of the public and to generate meaningful feedback.
4. We provide system training to all members of the management support teams who now have
responsibility for logging and tracking complaints.
5. We provide complaint handling training sessions on at least a quarterly basis as a refresher
session, or for training for new staff.
6. We support the implementation of Child Friendly Complaints Handling Procedures.

Page 35

35 
Appendix 2 
Duty of Candour
Annual Report 2022/23

Page 36

36 
Introduction
North Lanarkshire Health and Social Care Partnership recognises that when adverse events occur during
the provision of treatment or care, openness and transparency is fundamental. The duty of candour
arrangements which we have implemented reflect the Scottish Government’s commitment to place
people at the heart of health and social care services in Scotland. When harm occurs the focus must be
on personal contact with those affected; support, and a process of review and action that is meaningful
and informed by the principles of learning and continuous improvement.
The Health (Tobacco, Nicotine etc. and Care) (Scotland) Act 2016 was implemented on 1st April 2018
placing an organisational duty (Duty of Candour) on health, care, and social work services to be open
and honest with people in their care. 
The overall purpose of this duty is to ensure organisations are open, honest, and supportive when there
is an unexpected or unintended incident resulting in death or harm as defined in the Act. All health and
social care services in Scotland have a duty of candour, a legal requirement which means that when
things go wrong and mistakes happen, the people affected understand what has happened, receive an
apology, and that organisations learn how to improve for the future. 
A key part of this duty is that Health and Social Care publish an annual report about the duty of candour in
our services. This short report describes how the services we commission, and our own services have
operated the duty of candour during the time between 1 April 2022 and 31 March 2023. 
Information about policies and procedures 
All social care organisations have a Duty of Candour policy. All staff who are employed in the sector
should be aware that all instances that necessitate implementation of Duty of Candour must
immediately be reported. In such instances, a manager will then take the appropriate action, ensuring
relevant bodies [depending on the sector] such as Social Work and Care Inspectorate are notified of the
event. Where an incident occurs that triggers the duty of candour, managers have responsibility for
ensuring that the duty of candour procedure is followed. Information on Duty of Candour and
reportable incidents is described in detail within Appendix A. 
82 commissioned organisations were asked to provide information in relation to Duty of Candour
activity in the reporting period. Of the 34 [41%] that responded, there were six reported incidents.
Details of those who responded are noted in Appendix B. All North Lanarkshire Council social work in-
house services - home support, integrated day services, locality support services and children services
were also asked to provide information. There were no Duty of Candour incidents reported from any of
the council provided services. Reporting of Duty of Candour incidents are an integral part of our
Contract Monitoring Framework and all should be reported on quarterly contract monitoring returns. 
How many incidents happened to which the duty of candour applies? 
In the reporting period, six incidents have been reported to which the duty of candour applied, one in
relation to maladministration of paracetamol, and five where a person fell and sustained physical

Page 37

37 
harm. All incidents reported were from a commissioned care home service. No Duty of Candour
incidents were reported by North Lanarkshire Council in-house social work services. 
The low number and type of reported incidents indicate that there may be some uncertainty over
situations where Duty of Candour responsibilities should be invoked. Refresher sessions on Duty of
Candour duties will be delivered to our in-house teams over the course of 2023-2024. Reminders and
information slides will be sent to all our commissioned services to ensure that they are fully aware of
the duties under the Act. 
Details of incidents where Duty of Candour applied.
Nature of incident: Duty of Candour raised for accident where resident fell and fractured his femur.
Incident fully investigated and reported. Relative invited to a Duty of Candour meeting but declined to
attend.
Nature of incident: Duty of candour raised for incident whereby a resident received an overdose of
Paracetamol. No lasting harm occurred. Incident fully investigated and reported. Relative invited to
Duty of Candour meeting but declined to attend.
Nature of incident: Duty of Candour raised for an incident where a resident had staples to a wound in
her head following an unwitnessed fall. No lasting harm occurred. Incident fully investigated and
reported. Relative declined invite to attend Duty of Candour meeting. 
Nature of incident: Duty of Candour raised for incident where a resident had sutures to head wound
following a witnessed fall. No lasting harm occurred. Incident fully investigated and reported. Family
were invited to attend a Duty of Candour meeting but declined to attend. 
Nature of incident: Duty of Candour raised for incident concerning a resident who sustained a fracture
due to witnessed fall. Incident fully investigated and reported. Family were invited to attend a Duty of
Candour meeting but declined to attend. 
Nature of incident: Duty of Candour raised for incident concerning a resident who sustained a fracture
due to an unwitnessed fall. Incident fully investigated and reported. Relatives were invited to a Duty of
Candour meetings but declined to attend. 
Unfortunately, there were incidents where Duty of Candour duties should have been invoked but
were not. Reasons for failure were inexperienced management and lack of familiarity with Duty of
Candour procedures. Another factor was due to Police involvement in two serious incidents, where it
was understood that Police involvement superseded Duty of Candour.
Conclusion 
Within the reporting period, there were no Duty of Candour incidents reported from in-house home
care or social work services and only six from commissioned care home providers. From those reported,
none had lasting consequences for the person to whom the duty applied - appropriate action taken,
lessons learned, procedures and training revised, and where applicable, families informed, and invited
to discuss in more detail. In future, if any incidents occur that invoke Duty of Candour proceedings,
there will be a review process to identify lessons learned, with the result of the review

Page 38

38 
shared with the relevant person/persons. This approach will minimise the impact on the organisation
and the vulnerable people that we strive to support. 
Appendix A – Definition of Harm and appropriate level of response 
Grading of
Harm
Definition of Harm Level of Response
No harm,
incident
prevented
Any service user safety incident that had the
potential to cause harm but was prevented.
These incidents are outside of the scope of
the duty of candour. Social work
professionals may however feel it is
appropriate to inform the person
involved if it is in their best interest.
No harm,
incident not
prevented
Any service user safety incident that occurred
but no harm was caused to the person involved.
These incidents are outside of the scope
of the duty of candour policy. Being open
in a discussion between staff involved and
the service user and their family is
usually undertaken locally.
Low Harm Any service user safety incident that led to the
extra observation or minor treatment such as first
aid or additional medication for the person
involved.
These incidents are outside of the scope
of the duty of candour policy. Being open
in a discussion between staff involved and
the service user and their family is
usually undertaken locally.
Moderate
Harm
A level of harm that is not permanent but
has led to a moderate increase in treatment
or prolonged psychological harm of more
than 28 days.
For example, a return to theatre, an unplanned
readmission to hospital,
unexpected admission to critical care, a prolong
hospital stay or additional out service user visits.
Duty of candour is a statutory
requirement. Notification should be
given to the person affected or their
representative in person including an
explanation of the incident, the process
for investigation and an apology. This will
be followed up in writing and on
conclusion of the investigation the
findings and outcome will be available to
the service user of their representative.
Serious Harm Any service user safety incident that has
resulted in permanent harm that is directly
related to the incident and not the natural
course of an illness or the underlying condition
of the person affected. Examples of severe
harm are permanent lessening of bodily
functions, sensory, motor, physiological or
intellectual function, removal of the wrong
organ or limb or brain damage.
Duty of candour is a statutory requirement
– see above.
Death Any service user safety incident that directly
resulted in the death of a person and is not
related to their illness or underlying condition.
Duty of candour is a statutory requirement
– see above.

Page 39

39 
Appendix B
Organisations who provided a response: all but one returned a nil response. 
All New Beginnings Angels
Aspire
Beechwood Care
Home Capability
Scotland Care
One Professional
Care Solutions
C-
Change
Cera
Care
Corners
tone
Deanston Care
Home Enable
Scotland
Enhance Supported Living
Services HRM
Inclusion
Scotland
Invercare
Keane Premier Support
Services Key Housing
Lanarkshire Association for Mental Health
Lanarkshire Care Partners
Local Lanarkshire
Care Lochside
Manor
Love
Partners in
Play
Penumbra
PHEW
Potential
Living
Quarriers
Scottish
Autism
Support for Ordinary Living
The Richmond Fellowship
Scotland Thera Care
Turning Point
Scotland
Wheatley Care