Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 18 October 2023
Back to Planning, Protective Services and Licensing Committee — 18 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
11 October 2023 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 18 OCTOBER 2023 at 11:00 AM, which you
are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 20
September 2023 at 10.30 am (Pages 3 - 14)  
(b) Planning, Protective Services and Licensing Committee held on 20
September 2023 at 2.00 pm (Pages 15 - 20)  
(c) Planning, Protective Services and Licensing Committee held on 20
September 2023 at 2.45 pm (Pages 21 - 24)  
(d) Planning, Protective Services and Licensing Committee held on 20
September 2023 at 3.30 pm (Pages 25 - 26)
* 4. CONSUMPTION OF ALCOHOL IN DESIGNATED PLACES BYELAWS (Pages 27 -
28)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
5. PRIVATE HIRE CARS AND TAXIS LICENSED IN ARGYLL & BUTE (Pages 29 - 34)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
6. MS GAIL CRAWFORD: ALTERATIONS AND EXTENSIONS: 4 WEST LENNOX
DRIVE, HELENSBURGH (REF: 23/00652/PP) (Pages 35 - 62)  
Report by Head of Development and Economic Growth 
Public Document Pack

Page 2

7. LOCAL DEVELOPMENT PLAN 2 TECHNICAL NOTES (Pages 63 - 150)  
Report by Executive Director with responsibility for Development and Economic
Growth 
8. FOOD CONTROL LAW ENFORCEMENT PLAN 2023-2025 (Pages 151 - 178)  
Report by Executive Director with responsibility for Environmental Health 
REPORT FOR NOTING 
9. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISION (Pages 179 - 190)  
Report by Head of Development and Economic Growth 
EXEMPT REPORT FOR DECISION
E1 10. REQUEST FOR A TREE PRESERVATION ORDER (Pages 191 - 198)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:- 
E1 Paragraph 13  Information which, if disclosed to the public, would reveal that the
authority proposes- 
(a) to give under any enactment a notice under or by virtue of which requirements
are imposed on a person; or
(a) to make an order or direction under any enactment. 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held by BY MICROSOFT TEAMS on WEDNESDAY, 20 SEPTEMBER 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Graham Hardie
Councillor Mark Irvine 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Luna Martin
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Fergus Murray, Head of Development and Economic Growth
Shona Barton, Governance Manager
Peter Bain, Development Manager
Matt Mulderrig, Development Policy & Housing Manager
Alan Morrison, Regulatory Services & Building Standards Manager
Sandra Davies, Major Applications Team Leader
David Moore, Senior Planning Officer
Fiona Scott, Planning Officer – Oban Lorn and the Isles
Norman Shewan, Planning Officer – Helensburgh and Lomond 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Amanda Hampsey and Daniel
Hampsey. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 23
August 2023 at 11.00 am was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 23
August 2023 at 2.00 pm was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 23
August 2023 at 2.45 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 29
August 2023 was approved as a correct record. 
4. MR SHAUN SINCLAIR: ERECTION OF CAFÉ WITH ASSOCIATED
LANDSCAPING INCLUDING A VIEWPOINT, SEATING, INTERPRETIVE SIGN
AND PLAY PARK: LAND WEST OF INVERLUSRAGAN, CONNEL (REF:
21/01583/PP) 
Before proceeding with his presentation, the Development Manager referred to a late
representation received from Councillor Julie McKenzie who is one of the local Members
Page 3 Agenda Item 3a

Page 4

for this Ward area.  He advised that Councillor McKenzie had noted her support for the
Applicant and a request for Members to have the application determined at a pre-
determination public hearing and he summarised her reasons for this.   
Reference was also made to an error within section F of Appendix B which referred to a
meeting of the Connel Community Council on 9 May 2022.  It has since been noted that
this was an independent meeting arranged by the Applicant. 
The Development Manager then spoke to the terms of the report.  This proposal is
seeking to secure planning permission for the erection of a café with incidental ‘drive-thru’
takeaway plus associated landscaping, including a viewpoint, seating, interpretive sign
and play park. 
In terms of the Settlement Strategy set out in the adopted Local Development Plan (LDP),
the application site is situated within the defined Minor Settlement of Connel where
Policies LDP STRAT 1 and LDP DM 1 might ordinarily be expected to give general
encouragement to small scale development on appropriate sites subject to compliance
with other relevant policies and Supplementary Guidance (SG).   
However, this site is within an Open Space Protection Area (OSPA) where Policy SG LDP
REC/COM 2 does not permit development on an OSPA unless is satisfies one of the 5
criteria listed in Policy SG LDP REC/COM 2.  This OSPA provides visual amenity
functions rather than recreation functions and accordingly it is not considered that the
proposal development satisfies any of the 5 criteria set out in Policy SG LDP REC/COM 2. 
The OSPA in this location helps preserve the open aspect of the land on the shore side of
the road and along with it the public views.  The OSPA forms part of the wider network of
OSPAs alongside Loch Etive that, together, provide the wider function of preserving the
undeveloped aspect of the shore side of the road. 
Whilst the potential economic and community benefit arising from the proposed
development is noted, it is not considered that this is sufficient to set aside the detrimental
impact that the proposed development will have on the open landscape character of the
area and the primary function of the OSPA to protect this together with important public
views of Loch Etive which give the settlement of Connel much of its unique character. 
It was recommended that planning permission be refused for the reasons stated in the
report. 
Motion 
To agree to refuse planning permission for the reasons detailed in the report. 
Moved by Councillor Kieron Green, seconded by Councillor Luna Martin. 
Amendment 
To agree to hold a discretionary hearing for this application. 
Moved by Councillor Audrey Forrest, seconded by Councillor John Armour. 
A vote was taken by calling the roll. 
Page 4

Page 5

Motion   Amendment 
Councillor Green  Councillor Armour
Councillor McCabe  Councillor Blair
Councillor Martin  Councillor Brown    
Councillor Forrest    
Councillor Hardie    
Councillor Irvine    
Councillor Kain    
Councillor Kennedy    
Councillor Philand    
Councillor Wallace 
The Amendment was carried by 10 votes to 3 and the Committee resolved accordingly. 
Decision 
The Committee agreed: 
1. to hold a discretionary pre-determination hearing on a Hybrid basis; and 
2. to hold an informal site visit in advance of this hearing. 
(Reference: Report by Head of Development and Economic Growth dated 5 September
2023, submitted) 
5. MR D HIGGINS: ERECTION OF DWELLINGHOUSE, FORMATION OF
VEHICULAR ACCESS AND ASSOCIATED WORKS: GARDEN GROUND OF
TORWOOD HOUSE, TORWOODHILL ROAD, RHU, HELENSBURGH (REF:
22/02523/PP) 
The proposed development comprises the sub-division of a residential curtilage, and the
erection of a new detached 4-bedroom house with new access, land engineering works,
and installation of a private surface water drainage system. 
The site is located within the village of Rhu and lies within Rhu Conservation Area.  Both
the ‘donor property’ “Torwood House”, and the residential property adjacent to the north,
“Carbeth House” are both Category “C” listed buildings. 
Before proceeding with his presentation, the Planning Officer summarised the background
to this application. 
The Committee considered this proposal at a meeting on 21 June 2023 when it was
recommended by Officers that planning permission be refused on the sole basis that the
private public access was unsuitable to accommodate the resultant intensification of
traffic.   At the request of the Applicant, the Committee agreed at this meeting to defer
determination of this application to allow an opportunity for the Applicant to prepare and
submit further details to demonstrate that there were no constraints to the implementation
of an agreed scheme of commensurate off-site road improvements.   
Reference was made to supplementary report number 2 which advised that further
information has been submitted by the Applicant providing detail of proposed road
improvements.  A revised consultation response was received from the Council’s Area
Page 5

Page 6

Roads Engineer on the basis of the additional information submitted by the Applicant
following the June meeting of the PPSL Committee and concludes that the proposed off-
site road improvements (provision of 2 passing places) will address previous concerns
regarding the design capacity of the public road to accommodate the intensification of
traffic result from the proposed new house.  The Applicant has confirmed they have
control over the land outwith the application site required for these off-site road
improvements. 
The Planning Officer summarised a further representation received from one of the
original objectors on the basis of the revised drawings submitted by the Applicant, and
addressed the concerns that had been expressed. Reference was also made to the other
objections which were addressed in the original report of handling and supplementary
report number 1. 
Officers are satisfied that the Applicant has the necessary control to implement the off-site
road improvements and this can be secured by means of a suspensive condition.  The
provision of off-site road improvements commensurate with the scale and nature of the
proposed development complies with the provisions of Policy LDP 11 and SG LDP TRAN
5.  It is considered that the application proposal is in accordance with all relevant
provisions of the Development Plan and will not give rise to any other planning matters
that would warrant a departure from these procedures. 
It was recommended that planning permission be approved subject to the conditions set
out in supplementary report number 2. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes 
The development shall be implemented in accordance with the details specified on the
application form dated 12th December 2022, supporting information and, the approved
drawings listed in the table below unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64 of the
Town and Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No.  Version  Date Received 
Location Plan  807(L)000A - 25.01.2023 
Existing Site Plan 807(L)002A - 25.01.2023
Proposed Site
Plan 
807(L)002 Rev. B 09.08.2023 
Proposed Plans,
Sections
and Elevations
807(L)003A - 25.01.2023
Page 6

Page 7

Tree Survey Plan 2016_015/01 - 13.12.2022
Location Plan with
Passing Places
807(L)004    
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. No development in relation to the construction of the dwellinghouse, hereby approved,
shall commence until such time as the two passing places identified in drawing no
807(L)004 have been fully formed and surfaced. 
Notwithstanding the details shown on the approved plan, construction details for the
proposed passing places shall be submitted to and approved in writing by the Planning
Authority, in consultation with the Roads Authority, prior to implementation. 
Reason: In the interest of road safety. 
3. PP - Junction with public road: 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing 08/006 Rev A. and
visibility splays of 2.4 metres to point X by 25.0 metres to point Y from the centre line
of the proposed access. 
The access road shall be a minimum width of 5.5m for the first 10m from the back of
the service bay. Thereafter it may be reduced to a private driveway of minimum 3.5m
width. 
The access shall be surfaced with a bound material in accordance with the stated
Standard Detail Drawing for a minimum of 5.0m back from the edge of the
carriageway. 
Prior to work starting on site the access hereby approved shall be formed to at least
base course standard and the visibility splays shall be cleared of all obstructions such
that nothing shall disrupt visibility from a point 1.05 metres above the access at point X
to a point 0.6 metres above the public road carriageway at point Y. The final wearing
surface on the access shall be completed prior to the development first being brought
into use and the visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
Note to Applicant:  
 A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road. 
 The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
4. PP - Access Gradient 
Page 7

Page 8

Notwithstanding the provisions of Condition 1, the gradient of the service bay / access
road / driveway shall not exceed 1 in 20 within 5 metres of the edge of the existing
carriageway and shall thereafter not be steeper than 1 in 7. 
Reason:  In the interest of road safety. 
5. PP – No Walls, Fences or Hedges Beside the Road 
The development shall not include for the provision of walls, fences or hedges within
2.0 metres of the carriageway of the public road, and any gates shall open inwards,
away from the public road. 
Reason: In the interest of road safety. 
6. PP - Parking and Turning Further Details Required 
Notwithstanding the provisions of Condition 1, no development shall commence until
full details of the layout and surfacing of a parking and turning area to accommodate
three  vehicles within the application site have been submitted to and approved in
writing by the Planning Authority in consultation with the Council’s Roads Engineers. 
The submitted layout shall demonstrate that adequate manoeuvring space will be
provided within the site to allow a vehicle to enter and leave in a forward gear. 
The duly approved scheme shall be implemented in full prior to the development first
being occupied and shall thereafter be maintained clear of obstruction for the parking
and manoeuvring of vehicles. 
Reason: In the interest of road safety. 
7. PP – Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until written
details of the type and colour of materials to be used for the external wall finishes and
the roof slate have been submitted to and approved in writing by the Planning
Authority. The development shall thereafter be completed using the approved
materials or such alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
8. PP – Full Landscaping Scheme 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species
and size of every tree/shrub to be planted; 
Page 8

Page 9

v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development;
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
9. PP / PPP / AMSC – Pre-commencement Survey 
No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of Bats has been carried out by an
appropriately qualified person and has been submitted for the written approval of the
Planning Authority in consultation with Nature.Scot. In circumstances where species of
interest are identified as being present, or at risk from construction works, the survey
shall further provide suggested avoidance and or mitigation measures, including timing
constraints, to address such presence or risk. The development shall be implemented
in accordance with the measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
10. PP – Surface Water Drainage – Further detail required 
Notwithstanding the provisions of Condition 1, no development shall commence until
details of the intended means of surface water drainage to serve the development
have been submitted to and approved in writing by the Planning Authority, in
consultation with the Roads Authority. 
Drainage shall be achieved within the site boundary and no water shall discharge onto
the public road carriageway. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development and maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Page 9

Page 10

11. PP – Tree Retention and Protection 
No development shall commence until a site plan showing the Root Protection Area for
every existing tree proposed to be retained (with reference to the Tree Inspection
Report – October 2016) has been submitted to and approved in writing by the Planning
Authority. 
Tree protection measures shall be implemented for the full duration of construction
works in accordance in accordance with BS 5837:2005 “Trees in Relation to
Construction” and the Tree Inspection Report – October 2016. No trees shall be
lopped, topped or felled other than in accordance with the details of the Tree
Inspection Report unless otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation. 
(Reference: Report by Head of Development and Economic Growth dated 7 September
2023, submitted) 
Councillors Jan Brown and Liz McCabe left the meeting during consideration of the
foregoing item. 
6. YLEM ENERGY LTD: PROPOSAL OF APPLICATION NOTICE FOR
INSTALLATION OF 50MW BATTERY ENERGY STORAGE SYSTEM TO
BALANCE THE ELECTRICITY NETWORK AND FACILITATE RENEWABLE
ENERGY DEPLOYMENT: ARDENCAPLE FARM, RHU, HELENSBURGH (REF:
23/01276/PAN) 
The Senior Planning Officer spoke to the terms of the report.  This Proposal of Application
Notice (PAN) provides notice of the developer’s intention to submit a planning application
for the erection and operation of a 50 Mw battery storage facility.  The proposed
development will be located in a field north of the West Highland Railway Line and South
of existing high voltage overhead lines operated by Scottish Power.  The site is located
within the Greenbelt.  It is not located within either the Duchess Woods or Highlandman’s
Wood Local Nature Conservation sites, which are located to the south, east and north of
the proposed site. 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date. 
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and submissions and provided the
following feedback to the Applicant: 
Page 10

Page 11

 As part of the consultation process the Applicant should consider including residents
beyond the 750m radius of the proposed site and they should also consult with the MP
for Argyll and Bute; 
 The application should include justification on why there was a locational need for this
development to be within the Greenbelt area; 
 The application should address any potential noise issues. 
(Reference: Report by Head of Development and Economic Growth dated  5 September
2023, submitted) 
7. LOCH LONG SALMON LIMITED: PROPOSAL OF APPLICATION NOTICE FOR
THE INSTALLATION AND OPERATION OF LURIGNISH FISH FARM AND
ASSOCIATED INFRASTRUCTURE: LURIGNISH FISH FARM, LAND ADJACENT
TO LURIGNISH FARM, APPIN (REF: 23/01581/PAN) 
The Major Applications Team Leader spoke to the terms of the report. Based upon the
description of the development contained within the Proposal of Application Notice (PAN),
the forthcoming application is anticipated to comprise a semi closed containment marine
fish farm and supporting shore base with associated new access and landscaping.  The
fish farm will be located in Loch Linnhe with the shore base element being located off the
A828 adjacent to the marine element at Lurignish which is located north of Shuna Island
and the settlement of Appin.  The terrestrial site is located within a countryside zone within
an area designated as an Area of Panoramic Quality.  The Lynn of Lorn National Scenic
Area lies approximately 1.4km to the south of the proposed development. 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date. 
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and submissions and provided the
following feedback to the Applicant: 
 The application should include provision of the details of the closed system process
and the difference between that and a conventional fish farm; and 
 The application should provide details of any impact on wild swimmers in respect of
chemicals that will be used. 
(Reference: Report by Head of Development and Economic Growth dated 7 September
2023, submitted) 
Councillor Liz McCabe returned to the meeting during consideration of the foregoing item.
Page 11

Page 12

8. PLANNING POLICY RESPONSE TO ARGYLL AND BUTE'S DECLARED
HOUSING EMERGENCY 
A report providing an over view of some of the potential planning policy responses in
recognition of the housing emergency which was declared at the Environment,
Development and Infrastructure Committee in June 2023, was considered. 
Decision 
The Committee agreed: 
1. to note and endorse the content of the report; 
2. to explore the options for designating a short-term let control area/s for all, or parts of,
the planning authority’s area and report findings back to PPSL; 
3. that Officers prepare a draft Technical Planning Note in support of NPF4 and LDP2,
providing updated guidance on affordable housing delivery including its retention in
perpetuity and accommodating key workers for consideration by Members; and 
4. that Officers prepare a draft Technical Note in support of NPF4 and LDP2, that will
provide guidance on how we ensure housing is delivered to meet the local housing
needs as identified by the Housing Needs Demand Analysis (HNDA), including
potential occupancy restrictions for consideration by Members. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 23 August 2023, submitted) 
9. OCCUPATIONAL HEALTH AND SAFETY LAW ENFORCEMENT PLAN 2023-
2025 
The Council, as the “enforcing authority” under the Health and Safety at Work etc. Act
1974, is required formally to approve an Occupational Health and Safety Law
Enforcement Work Plan under the statutory National Local Authority Enforcement Code.   
A report presenting the 2023-25 Work Plan and Enforcement Policy was before the
Committee for consideration. 
Decision 
The Committee agreed to: 
1. recognise the work by Regulatory Services to secure, and where appropriate improve,
the standards of health and safety across businesses in Argyll and Bute.  This directly
protects employees and others (eg members of the public etc), supports businesses
and indirectly supports the wider economy; and 
2. formally endorse the Occupational Health and Safety Law Enforcement Workplan
2023-25 and enforcement policy to be implemented by Regulatory Services. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 20 September 2023, Occupational Health and Safety Law
Page 12

Page 13

Enforcement Work Plan 2023-25 Priorities, and Argyll and Bute Council Occupational
Health and Safety Law Enforcement Policy, submitted) 
10. ANIMAL HEALTH & WELFARE WORK PLAN 2023/25 
The Council has a statutory duty under the Animal Health (Scotland) Act 1981/2006 to
regulate the provisions of the Act. These responsibilities are to enforce legislative
standards and secure compliance relating to animal health. 
A report outlining the work and priorities of the animal health and welfare inspectors,
within Regulatory Services, and seeking approval of the Animal Health & Welfare
Enforcement Work Plan 2023/25 which focuses on preventing the spread of animal
diseases and protecting standards of welfare, was considered. 
Decision 
The Committee noted the nature of this work and agreed to formally endorse the Argyll &
Bute Animal Health & Welfare Work Plan 2023/25. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 6 September 2023 and Animal Health and Welfare Service Plan
for Argyll and Bute 2023/25, submitted) 
* 11. REVIEW OF ARGYLL AND BUTE COUNCIL'S SHORT-TERM LET LICENSING
POLICY 
A report recommending changes to the Council’s Short-Term Let Licensing Policy to take
account of issues which have arisen following a review of the scheme in the first 11
months and a letter from a solicitor, acting on behalf of the Association of Scottish Self
Caterers (ASSC), advising of a possible judicial review against aspects of the policy, was
considered. 
Decision 
The Committee: 
1. considered this report and the revised Short-Term Let Licensing Policy detailed in
Appendix 1; and 
2. recommended to Council approval of the revised Short-Term Let Policy. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 7 September 2023 and Revised Argyll and Bute Short-term Let
Licensing Policy, submitted) 
Councillor Paul Kennedy left the meeting during consideration of the foregoing item. 
12. IMPLICATIONS OF THE INTRODUCTION OF THE FIREWORKS AND
PYROTECHNIC ARTICLES (SCOTLAND) ACT 2022 WITH RESPECT TO
FIREWORK CONTROL ZONES 
Part 6 of the Fireworks and Pyrotechnic Articles (Scotland) Act 2022 was brought into
force on 22 June 2023.  This part of the Act confers discretionary powers on local
Page 13

Page 14

authorities to designate a place within their area as a Firework Control Zone (FCZ) and
make provision as to how these powers are to be exercised. 
A report setting out the changes to existing legislation, and the new discretionary powers
available to the Council, was considered. 
Decision 
The Committee agreed: 
1. to note the provisions of the Fireworks and Pyrotechnic Articles (Scotland) Act 2022
and particularly the matter of Firework Control Zones; 
2. that there was, currently, no requirement to designate any area as a Firework Control
Zone; and 
3. that Officers would look at establishing a portal with supporting information for
“Community Requests” for a Firework Control Zone as set out in paragraph 4.10 of the
report. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 18 August 2023, submitted) 
13. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI FARE SCALE REVIEW 
A report advising that the review of scales for taxi fares and other charges had now
concluded and the fares fixed with effect from 22 October 2023 was before the Committee
for information. 
Decision 
The Committee noted the report and that a further review of the taxi fares would take
place within 18 months of 22 October 2023 as required in terms of Section 17 of the Act. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 20 September 2023, submitted)
Page 14

Page 15

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 20 SEPTEMBER 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Graham Hardie 
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Fiona Macdonald, Solicitor
Morgan Romilly, Applicant
Hayley Romilly, Applicant
Stephen McIntyre-Stewart, Objector 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Amanda Hampsey, Daniel
Hampsey, Paul Kennedy and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR GRANT OF
A TAXI CAR LICENCE (M ROMILLY AND H ROMILLY, HELENSBURGH) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicants opted to proceed by way of
audio call and Morgan and Hayley Romilly joined the meeting by telephone. 
Stephen McIntyre-Stewart, Objector, also opted to proceed by way of audio call and joined
the meeting by telephone. 
All of the other objectors (Mark Franks, Paul Dornan, Colin McNeill and Kimberley Clerk)
were unable to attend today and had asked Mr McIntyre-Stewart to speak on their behalf. 
The Chair then outlined the procedure that would be followed and invited the Applicants to
speak in support of their application.   
APPLICANT  
Mrs Romilly read out the contents of an email which Mr Romilly had submitted to the
Licensing Team prior to the start of this hearing.  The email addressed their concerns
about the objections that had been submitted in respect of this application. 
Page 15 Agenda Item 3b

Page 16

Mr Romilly then spoke in support of their application.  He advised that they had been
operating successfully in the town for a number of years and it had come to the point that
demand exceeded their capacity.  He said they no longer had the spare capacity and that
their regular customers sometimes had to wait for around 40 minutes for a taxi, especially
on Friday and Saturday nights.  He referred to issues in the past with the current vehicle
needing repairs and that the dealer was in Edinburgh.  He advised that an extra plate
would also act as a safety net when the other vehicle was transporting customers to
Glasgow and further afield.  He advised that quite regularly after 2 am when the trains
stopped there were no taxis available in town.  He said that their vehicle was regularly the
only taxi active around 2 am – 6 am.  He said that they regularly took fares to Edinburgh
and Glasgow which left Helensburgh without a taxi for up to an hour in the middle of the
night.  He said there was plenty trade during the night.   
He advised that this vehicle was a fully electric Nissan Leaf.  He said that they’d had great
success with their current vehicle. 
Mr Romilly referred to the LVSA survey and commented that it was a number of years out
of date.  He said that this was a busy town and he could justify the need for a second car. 
He said he was confused as to why Mr McIntyre-Stewart was objecting as he was just
granted a plate himself.   Referring to the number of plates in Helensburgh, he advised
that these vehicles were not available 24 hours as a lot of the Operators had full time jobs
and seen taxi work as a hobby. 
QUESTIONS FROM OBJECTOR 
Mr McIntyre-Stewart referred to claims made that he had taken photographs of Mrs
Romilly and her vehicle.  He asked Mr Romilly if he had a copy of the photograph he took.
Mr Romilly advised there was CCTV footage.  Mr McIntyre-Stewart asked if that footage
had been submitted today.  Mr Romilly advised that it could be submitted. 
Mr McIntyre-Stewart referred to comments that he reversed into a petrol pump.  He
commented that Mrs Romilly was hanging onto his vehicle at that point and this could be
seen from the CCTV footage.  He asked Mr Romilly to confirm if this was the CCTV
footage that he had seen.  Mr Romilly replied that Mr McIntyre-Stewart would need to ask
the Police and Tesco about that. 
Mr McIntyre-Stewart questioned Mr Romilly about whether his current vehicle was an
electric vehicle or a plug in hybrid, commenting that he advertised his vehicle as fully
electric.  Mr Romilly commented that he could not see why this was being brought up at
this meeting. 
Mr McIntyre-Stewart asked Mr Romilly to confirm if he had phoned Mr McNeil last night to
ask him to withdraw his complaint.  Mr Romilly advised that he had tried to contact him
about covering a job. 
Councillor Gordon Blair raised a point of order on the relevancy of the questions.   
The Governance Manager, Mrs Barton, pointed out to Mr McIntyre-Stewart that his
questions should relate to the submission from the Applicant and she encouraged Mr
McIntyre-Stewart to remain focussed on the points that have been made by Mr Romilly. 
The Council’s Solicitor, Ms Macdonald, referred to both parties alluding to previous
complaints which did not form part of this hearing.  She advised that complaints had been
Page 16

Page 17

made against Mr Romilly to the Licensing Team and that these had been investigated and
not upheld.  She advised that Mr McIntyre-Stewart was bringing up some of those
complaints again in this forum and reiterated that he should be focussing on the
application and matters relevant to this hearing and the application. 
The Chair supported the points made in the point of order.  He advised that he was trying
to give both parties a full opportunity to present their case and asked that they could both
keep to points that were really relevant. 
Mr McIntyre-Stewart asked Mr Romilly if he was aware of where these complaints came
from. 
Councillor Mark Irvine raised a point of order and said he was struggling to see the
relevancy of these complaints and allegations.  He said this appeared to be a civil matter
between 2 parties and that he did not think it was relevant to this application and should
be taken offline between the 2 parties. 
The Chair advised that he was trying to give both parties the fullest opportunity to present
their case.  He said he had given the Applicant the opportunity to raise a number of points
which he had and in the interests natural justice it was only right that the Objector should
also be able to put reasonable questions to the Applicant in terms of their submission. 
Councillor Irvine said he was uncomfortable with the unsubstantiated allegations and
questioned whether the constant back and forth was advancing the process of
determining this application. 
OBJECTOR 
Mr McIntyre-Stewart referred to there being a lack of trade.  He commented on the cost of
living crisis and said that the full difficulty of that had still to be seen.  He advised that
people were already stopping using taxis in the Helensburgh and Lomond area.  He said
that his business chose to go out to Arrochar and Kilcreggan for short journeys and that
they were losing money just to fill these gaps.  He said that he has heard nothing in Mr
Romilly’s submission that he would be prepared to do the same. 
He referred to the points raised in relation to the allegations made by a member of the
public.  He said he had sought advice from the Council and had been told to refer to this
person as a member of the public rather than naming them.  He said that Mr and Mrs
Romilly had given names in their statement and he said these were quite serious
allegations.  He commented that the Committee had a duty of care to the public and he
hoped that they would not ignore these for other reasons. 
Mr McIntyre-Stewart said there was clearly a lot of money being made by Mr Romilly’s
business and he questioned why he was not VAT registered. 
Mr McIntyre-Stewart advised that Mr McNeil had called him today to advise that Mr
Romilly had asked him to submit an email to say that he was withdrawing his objection. 
Mr McIntyre-Stewart said he was clearly not withdrawing his objection.  He commented
that Mr Romilly had also asked Mr Dornan to do the same.  Mr McIntyre-Stewart advised
that Mr Dornan had asked him to inform the Committee of an incident that had occurred
when Mr Dornan had been at Mr Romilly’s house and he explained the circumstances
around that.  Mr McIntyre-Stewart said there were clearly questions as to whether or not
Mr Romilly was a fit and proper person.  Mr McIntyre-Stewart said he was not saying the
Page 17

Page 18

same of Mrs Romilly as he did not know her well enough and that he had no reason to say
she was not a fit and proper person. 
Mr McIntyre-Stewart alleged of times when Mr Romilly had been intimidating toward the
other objectors.  He said that Mr Romilly had a reputation for not being suited to the taxi
industry and said that summed up what everyone had been saying to him. 
Mr McIntyre-Stewart referred to the minutes from a previous meeting in respect of the
application for his current vehicle, and said that Mr Romilly had contradicted himself in
respect of a number of issues.  He said this pointed to the fact that Mr Romilly was known
to embellish the truth and he advised that he believed he had done so again today. 
QUESTIONS FROM APPLICANT 
Mr Romilly referred to Mr McIntyre-Stewart continuing to go back to a past meeting of the
PPSL Committee and to him making allegations that he was not a fit and proper person. 
He asked Mr McIntyre-Stewart to point out where these allegations have come from as he
had not received anything about them.  Mr McIntyre-Stewart said that on the day the 5
letters of objection were submitted someone from Garelochhead had come forward with
allegations and he explained what these were.  He also referred to an incident which he
had witnessed at the taxi rank.  He said he was aware of at least one complaint that had
been submitted to the Council about Mr Romilly’s behaviour. 
Mr Romilly sought and received confirmation from Mr McIntyre-Stewart that he had hand
delivered the 5 objections to the Council.  Mr McIntyre-Stewart said the wording of the
objections was given to him and that he had typed them up.  He said that Mr McNeil, Mr
Franks and Ms Clerk had come together to decide the best wording and that was why the
contents of their objections were similar.  Mr McIntyre-Stewart said that he had not met
with the objectors to discuss the wording.  He advised that they had sent the wording to
him via WhatsApp and he had then typed the objections up and sent them back for them
to sign off. 
MEMBERS’ QUESTIONS 
Councillor Kain sought and received confirmation from Officers that this hearing was being
held to consider the application for a taxi car licence for car registration T400 WLF and the
next hearing scheduled for 2.45 pm being held to consider the application for a taxi car
licence for car registration T500 WLF.   
Councillor Kain referred to a photograph contained within the Agenda packs which
showed a licence plate T300 WLF.  Mr Romilly confirmed that this was his electric London
Taxi which he held a licence plate for (no. 6578).  He said the current plate was under his
name. 
Councillor Brown sought and received confirmation from Mr Romilly that he currently held
one Taxi Car Licence and that he was applying for 2 more car licences to add to his
business. 
Councillor Wallace referred to claims about inappropriate behaviour and sought and
received confirmation from Mr Romilly that he’d had no involvement with either the Police
or the Licensing Team in regard to any claims made. 
Page 18

Page 19

Councillor Green asked Officers if Police Scotland would have been made aware of this
application and given the opportunity to comment if they wished.  Ms Macdonald
confirmed that Police Scotland had not submitted a representation or objection in respect
of this application.  In relation to any allegations of impropriety, she said that the Council
would not disregard any allegations in that regard. 
Councillor Irvine sought and received confirmation from Ms Macdonald that there were
currently 47 car licences in the Helensburgh and Lomond area and at the time of the
LVSA report in 2014 there were 48. 
SUMMING UP 
Objector 
Mr McIntyre-Stewart said that complaints have been made to Police Scotland.  He said
that one of these was some years ago when Mr Romilly first arrived in Helensburgh.  He
referred to the details of this and said that nothing had come of it.  He also referred to the
details of another complaint submitted.  He said he could not name the person from
Garelochhead but knew that they had made an approach to the Council and had received
no response.  He said it was important for the Committee to be aware that there had been
some Police involvement. 
Applicant 
Mr Romilly thanked the Committee for their time.   He said he hoped the Committee could
see how much of a witch hunt this was.  He said that he has had no involvement with the
Police and that he was not aware of any of the allegations mentioned. 
He said that all the vehicles he would run would have internal tracking systems installed.  
He advised that this plate would allow his business to operate to the high standard they
have been rated as.  He advised that he had a lot of regular customers and that the
current vehicle was wheelchair accessible.  He said that they could not serve the amount
of customers they had at the moment.  He said he hoped the Committee would see how
much of a witch hunt this was and that all of the claims were just hearsay. 
When asked, both parties confirmed that they had received a fair hearing. 
DEBATE 
Councillor Irvine raised a point of order.  He asked if Officers could confirm if any written
objection against the Applicant had gone unanswered.  Ms Macdonald advised that there
had been previous complaints in relation to the Applicant along similar lines to those
raised today.  She said these were investigated by the Licensing Team and Legal
Services and it was considered that there were no arguable points in relation to these
complaints that would be taken to the Committee and that the complaints lodged were not
upheld.  She referred to comments about a couple of complaints submitted recently which
she said she was unaware of.  She confirmed that the complaints that have been
investigated were not upheld. 
Councillor Armour commented on hearing a lot that had little to do with this application. 
He said that he would assume that it would be normal for Police Scotland to have had
sight of this application and that they would have had sight of these objections.  He
commented that some of these objections and allegations were pretty serious and had the
Page 19

Page 20

Police thought they needed investigating, he would have thought they would have put an
objection in.  The fact that they had not done so, he said, led him to believe that the
application was valid and that the taxi provision would allow it.  He said he could see no
problem in accepting that this application go through. 
Councillor Hardie commented that there was no Police objection and a lot of hearsay.  He
said he would be happy to grant this application. 
Councillor Martin agreed that on the basis of what had been stated and also being
comforted that the Police had no objection, she would be happy to grant the application. 
Councillor Blair said that it was important to take complaints seriously. He commented that
the Committee wanted the best quality vehicles and drivers in all areas.  He said that he
felt there was a lot of conjecture today.  He added that if there were any issues about taxi
drivers or vehicles there were procedures there to deal with these.  He confirmed he
would be happy to grant the application. 
DECISION 
The Committee unanimously agreed to grant a Taxi Car Licence to Mr and Mrs Romilly for
Car Registration T400 WLF and noted that they would receive written confirmation of this
within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted)
Page 20

Page 21

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 20 SEPTEMBER 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Graham Hardie 
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Fiona Macdonald, Solicitor
Morgan Romilly, Applicant
Hayley Romilly, Applicant
Stephen McIntyre-Stewart, Objector 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Amanda Hampsey, Daniel
Hampsey, Paul Kennedy and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR GRANT OF
A TAXI CAR LICENCE (M ROMILLY AND H ROMILLY, HELENSBURGH) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicants opted to proceed by way of
audio call and Morgan and Hayley Romilly joined the meeting by telephone. 
Stephen McIntyre-Stewart, Objector also opted to proceed by way of audio call and joined
the meeting by telephone. 
All of the other objectors (Mark Franks, Paul Dornan, Colin McNeill and Kimberley Clerk)
were unable to attend today and had asked Mr McIntyre-Stewart to speak on their behalf. 
The Chair then outlined the procedure that would be followed and invited the Applicants to
speak in support of their application.  He advised that as the same parties were present
for this hearing as the previous one held at 2.00 pm, the Committee would take account of
the information presented before. 
APPLICANT  
Mr Romilly advised that this application was for a Taxi Car Licence for a 9 seater vehicle
(registration number T500 WLF), capable of carrying 8 passengers.  He said that it was
fully diesel at this time.  The sole purpose of this vehicle, as well as supporting the others,
Page 21 Agenda Item 3c

Page 22

would be to stay on the Loch side.  He referred to the LVSA survey report and everything
referring to Helensburgh and Lomond and to Mr McIntyre-Stewart advising at the previous
hearing of the need to serve Arrochar, Luss and Tarbet.  He said that you could constantly
see West Dunbartonshire cars going up and down so some did provide a service there. 
He commented that Mr McIntyre-Stewart had previously referred to the difficulties of
serving an area 35 minutes up the road from where a vehicle was located.  Mr Romilly
advised that if this plate was granted they had contracts in place up the Loch side and that
the vehicle would permanently reside in Arrochar.  He said that he and his wife were
considering a move to Arrochar.   
He said that he had received massive support for this vehicle from businesses such as
Luss Estates, Lennox of Lomond and the Golf Club.  Mr Romilly advised that he had also
received fantastic support from the Three Villages Hall Committee. 
He advised that the vehicle may appear in Helensburgh on occasions but the sole
purpose would be to be based in Arrochar and serve the people of the three villages from
there.  He referred to regularly getting customers looking for transport from Arrochar train
station to distances of less than half a mile and that it could not be justified sending a car
up there for a £3 or £4 hire.  He said it seemed that the people of these villages had been
forgotten about. 
He said there was huge support for a taxi dedicated to these villages.  He referred to the
local bus service being infrequent and did not allow locals and tourists to move about.  He
said this 8 seater vehicle would be capable of carrying people between businesses and he
believed the Council would have received an email about how much this service was
needed in the area. 
QUESTIONS FROM OBJECTOR 
Mr McIntyre-Stewart asked Mr Romilly if he would intend charging a call out fee and, if
not, how would he make his business model work.  Mr Romilly advised that he did not
intend to charge a call out fee.  He said the vehicle would remain in the area and that the
driver would live there so the vehicle would have a permanent base in the village. 
Mr McIntyre-Stewart referred to Mr Romilly’s plans to move to Arrochar and asked how
that would work for him covering the whole of Helensburgh and Lomond.  He said it did
not make a lot of sense.  Mr Romilly said he would use his vehicles wherever they were
needed and that if wanted to operate dead mileage he would. 
Mr McIntyre-Stewart referred to Mr Romilly saying he operated a 24 hour service and
asked if he had received many complaints about calls going unanswered.  Mr Romilly said
that he always returns calls to customers.  He referred to loss of mobile signal at times
when driving. 
OBJECTOR 
Mr McIntyre-Stewart said the main point was that as a plate was granted at the previous
hearing this brought the number of plates for the Helensburgh and Lomond up to 48.  He
said that business in Helensburgh and Lomond had dramatically reduced compared to pre
Covid times and he advised that it was likely to fall further due to the cost of living crisis. 
He said that he was seeing taxi drivers dropping out.  He said that what was needed was
competition and that he believed granting another plate to an already operating business,
instead of a separate individual, would stifle competition.
Page 22

Page 23

QUESTIONS FROM APPLICANT 
Mr Romilly advised that he had no questions. 
MEMBERS’ QUESTIONS 
Councillor Blair asked the Applicant how many taxis in total there were in Arrochar and if
the area was now up to capacity.  Mr Romilly advised that as far as he was aware there
were no taxis operating in the area.  He referred to a survey carried out by the Three
Villages Hall Committee, which stated they found it extremely difficult to get a taxi and that
there was no taxi service based in Arrochar or Tarbet.  He referred to the LVSA report
saying there was 48 taxis and said this was heavily focussed on Helensburgh. 
Mr McIntyre-Stewart advised of having one taxi for the Arrochar and Tarbet area.  He said
the difficulty people had was not about getting a taxi, it was about not getting a taxi without
being charged a call out.  He said his business was affected by this. 
SUMMING UP 
Objector 
Mr McIntyre-Stewart referred to Mr Romilly indicating that he intended to work in the
Arrochar area and that he understood he had work coming out from some parts of
Arrochar and Tarbet.  He said that this new taxi licence would severely curtail his
opportunities.  He said that he had one vehicle designated for that area and that they also
covered the Loch side.  He said that the only service that Mr Romilly would add to the
area was that this vehicle could take 8 passengers.  He suggested that due to the short
journeys, customers were quite happy to hire 2 vehicles to do a run. 
Applicant 
Mr Romilly said that this 8 seater vehicle would be dedicated to the north of Loch Lomond,
Arrochar, Tarbet and Luss.  He said there were contracts in place to make this a
sustainable vehicle for the area.  He advised that he had received positive responses from
the Three Villages Hall Committee and the evidence of this had been submitted to the
Licensing Team this morning.  He referred to 48 vehicles now covering the Helensburgh
and Lomond area and he said that be believed this area should be seen as 2 separate
areas.  He said that Luss and Tarbet were the forgotten villages. 
When asked, both parties confirmed that they had received fair hearing. 
DEBATE 
Councillor Brown sought and received confirmation that the total number of taxi licences in
the Helensburgh and Lomond area was 48, following the granting of a licence at the
previous hearing.  This brought the total to the same number of taxis that operated when
the LVSA survey was carried out. 
Councillor Brown asked if there was any leeway for the Committee to grant another
licence, given the intention to only run this taxi at the north end of Loch Lomond. 
Page 23

Page 24

Councillor Green said that the Committee always had leeway.  He said it was up to the
Committee to determine whether or not it would be appropriate and the Committee could
chose whatever information was relevant to determine whether an exception could be
made. 
The Governance Manager, Mrs Barton, advised that the LVSA survey was taken forward
by the PPSL Committee and an agreement was made that any future applications for taxi
car licences would come to the Committee for consideration regardless of any objections. 
She said it was not her view that the report was binding in terms of numbers and that it
was there for information.  She said that she believed there had been occasions when the
Committee have granted licences that have taken an area above the numbers in the
report. 
Councillor Kain said he would be inclined to approve this application as it seemed that it
would benefit Arrochar and other smaller locations which were not properly served at the
moment. 
Councillor Irvine agreed with Councillor Kain and said he would be happy to support the
application.  He said that Arrochar was within his Ward and that he was familiar with the
geography of the area.  He said there were lots of short-term lets and Airbnbs in the area
and that there had been a lot of local support for a taxi based in Arrochar at a Community
Council meeting and on social media.  He said he was sure there was demand and that it
would be up to the Applicant to justify his business model and, if he could support that,
then he was minded to support the employment of a driver in these areas. 
Councillor Blair said he was minded to support this application on the basis of support
from the community and the rural nature of that area.  He questioned whether a condition
could be put on the licence or if the Committee should just take the Applicant’s word about
where the taxi would operate.  He said that a taxi in this area would help service the public
transport network and from a connectivity aspect that was good.  He commented that it
was only up and over the hill to Lochgoilhead and that he was minded to support the
application on this occasion. 
Councillor Green said that he thought placing a condition on the licence would be overly
onerous on the Operator and this would prevent them from picking anyone up from
Helensburgh after dropping someone off from Arrochar. 
DECISION 
The Committee unanimously agreed to grant a Taxi Car Licence to Mr and Mrs Romilly for
Car Registration T500 WLF and noted that they would receive written confirmation of this
within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted)
Page 24

Page 25

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 20 SEPTEMBER 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Graham Hardie
Councillor Mark Irvine 
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Luna Martin
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Fiona Macdonald, Solicitor
Sergeant David Holmes, Police Scotland
Licence Holder 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Amanda Hampsey, Daniel
Hampsey and Paul Kennedy. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraphs
3 and 14 of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: REQUEST FOR SUSPENSION
OF TAXI DRIVER LICENCE 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing Police Scotland opted to proceed by way of
video call and Sergeant David Holmes joined the meeting by MS Teams. 
The Licence Holder opted to proceed by way of audio call and joined the meeting by
telephone.   
The Chair outlined the procedure that would be followed and invited Police Scotland to
speak in support of the Chief Constable’s complaint.   
POLICE SCOTLAND 
Sergeant Holmes read out the contents of a letter from the Divisional Commander dated 4
August 2023 which requested the immediate suspension of the licence and outlined the
reasons for this.
Page 25 Agenda Item 3d

Page 26

QUESTIONS FROM LICENCE HOLDER 
The Licence Holder was given the opportunity of asking Police Scotland questions. 
LICENCE HOLDER 
The Licence Holder spoke in support of his Licence. 
QUESTIONS FROM POLICE SCOTLAND 
There were no questions from Police Scotland. 
MEMBERS’ QUESTIONS 
The Members were given the opportunity to ask Police Scotland and the Licence Holder
questions. 
SUMMING UP 
Police Scotland 
Police Scotland were given the opportunity to sum up. 
Licence Holder 
The Licence Holder was given the opportunity to sum up. 
When asked, both parties confirmed that they had received a fair hearing. 
DEBATE 
The Members debated the request for suspension of the Taxi Driver Licence. 
DECISION 
The Committee unanimously agreed to suspend the Taxi Driver Licence with immediate
effect until 21 February 2024 when it would be considered again by the PPSL Committee,
and it was noted that the Licence Holder would receive written confirmation of this
decision within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted)
Page 26

Page 27

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE          
SERVICES AND LICENSING
COMMITTEE 
LEGAL AND REGULATORY
SUPPORT  18 October 2023 
CONSUMPTION OF ALCOHOL IN DESIGNATED PLACES BYELAWS 
1.0 INTRODUCTION 
The purpose of this report is to report to members on a review on the Consumption of
Alcohol in designated places Byelaws which is due for review in 2024. 
Argyll and Bute Council made byelaws in relation to the consumption of alcohol in  
designated places which came into force in 1999. They were amended in 2009. 
The byelaws were most recently reviewed in 2014 when, following information
provided by the police, areas in Oban were added namely Soroba, Glengallan and
Pulpit Hill. 
1.1 In terms of Section 201 of the Local Government (Scotland) Act 1973, byelaws require
to be reviewed not later than ten years from the coming into force of the byelaw and
every 10 years thereafter 
2.0 RECOMMENDATIONS
2.1 Members are requested to
a) Note the position with regards to the review of the Byelaw prohibiting consumption of
alcohol in designated areas in Argyll and Bute which is due for review in 2024.
b) Agree to recommend to the Council that no change to the byelaw is required at this
time, in the knowledge that should there be any changes in circumstances that a
formal review could take place at any point before the next period of review subject to
adherence to Scottish Government Guidelines and their consequent approval and
confirmation.
3.0 DETAIL
3.1 This report advises the Council on the Byelaws prohibiting consumption of alcohol in
designated areas which is due for review in  February 2024 
3.2 Under section 201(1) of the Local Government (Scotland) Act 1973 (“the 1973 Act”), a
local authority may make byelaws for the good rule and government of the whole or part
of their area, and for the prevention and suppression of nuisances therein. Almost all
local authorities in Scotland have an alcohol byelaw that covers a population or
geographical area.
3.3   The Council resolved to make bye-laws to prohibit the consumption of alcohol within
designated public places in Argyll and Bute in 1999.  The consumption of Alcohol
Byelaws were reviewed most recently in 2014 when, following information  from the
police, areas in Oban  were added namely Soroba, Glengallan and Pulpit Hill. 
The designated areas covered by the Consumption of Alcohol Byelaw are on the
website. There is a separate byelaw for Luss Public drinking byelaws | Argyll and
Bute Council (argyll-bute.gov.uk)
Page 27 Agenda Item 4

Page 28

3.4 Byelaws, once reviewed and established, are in situ for a period of 10 years. If a change
of circumstances emerge within the designated areas, byelaws can be reviewed within
the 10 year period in line with Scottish Government Guidelines. Changes to the
byelaws would be subject to public consultation and require approval and confirmation
by the Scottish Government.
3.5    Enforcement of the byelaw is provided for in sections 128 and 129 of the Antisocial
Behaviour etc. (Scotland) Act 2004 which gives police powers to issue a fixed penalty
notice for drinking alcohol in contravention of byelaws made under sections 201-203 of
the 1973 Act. If an offender refuses to pay the fixed penalty notice or wishes to challenge
the allegation in court and is found guilty, the offender is liable on summary conviction
to a fine not exceeding level 2 (£500) on the standard scale.
3.6 Police Scotland have been consulted on a review of the Consumption of Alcohol
Byelaw given their knowledge of crime figures and powers of arrest to tackle alcohol
related anti- social behavior. They have not provided any comment. 
4.0 CONCLUSION 
4.1 The Byelaws in respect of consumption of alcohol designated places in Argyll and Bute
is due for review in February 2024. In light of the fact that no comments have been received
from Police Scotland, it is recommended that no change to the Byelaws is made at this
time. Having completed the regulatory element of the review process we will update the
local community councils on the outcome and confirm that should there be any changes
in circumstances within the area in the future, it is possible that a formal review could
take place before the next period of review. This would be subject to adherence to
Scottish Government Guidelines and their consequent approval and confirmation. 
5.0 IMPLICATIONS
5.1 Policy: The application of the Byelaw process is consistent across all areas of Argyll and
Bute.
5.2 Financial : None
5.3 Legal; Byelaws are a legal process subject to section 201(1) of the Local Government
(Scotland) Act 1973 and Scottish Government guidance, approval and confirmation.
5.4 HR: None
5.5 Fairer Scotland Duty: None
5.5.1 Equalities - protected characteristics: None
5.5.2 Socio-economic Duty: None
5.5.3 Islands: None
5.6 Risk: Process ensures byelaw continues to be fit for purpose
5.7 Customer Service: None. 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
Councillor Kieron Green Policy Lead 
18th October 2023 
For further information contact: David Logan, Head of Legal and Regulatory Support 
Page 28

Page 29

ARGYLL AND BUTE COUNCIL     PLANNING, PROTECTIVE SERVICES &  
LICENSING COMMITTEE 
LEGAL AND REGULATORY SUPPORT 18 OCTOBER 2023 
PRIVATE HIRE CARS AND TAXIS LICENSED IN ARGYLL & BUTE 
1.0 EXECUTIVE SUMMARY 
The Planning, Protective Services and Licensing Committee agreed at their
meeting on 18 November 2020 that Officers should prepare periodic reports at
least every six months providing updates on the number of private hire cars
and taxis across the licensing authority’s area. 
Page 29 Agenda Item 5

Page 30

ARGYLL AND BUTE COUNCIL     PLANNING, PROTECTIVE SERVICES &  
LICENSING COMMITTEE 
LEGAL AND REGULATORY SUPPORT 18 OCTOBER 2023 
PRIVATE HIRE CARS AND TAXIS LICENSED IN ARGYLL & BUTE 
2.0 INTRODUCTION 
2.1 Following publication of the Scottish Government’s best practice guidance on
the power to refuse to grant private hire licences on the grounds of over
provision, consideration was given to a report inviting Members to amend the
procedure for determining private hire car licence applications. 
The Committee agreed at their meeting on 18th November 2020: 
a) that all future unopposed applications for private hire car licences may be
granted by Officers on a delegated basis; and  
b) that Officers should prepare periodic reports at least every six months, for
the Planning, Protective Services and Licensing Committee providing
updates on the number of private hire cars and taxis across the licensing
authority’s area. 
The last report was considered by the Committee on 19th April 2023. 
3.0 RECOMMENDATIONS 
3.1 That the members note and consider the number of private hire cars and taxis
across the licensing authority’s area as detailed in Appendix 1 and 2.   
4.0 DETAIL 
4.1 The purpose of this report is to provide an update on the numbers.  
Page 30

Page 31

5.0 CONCLUSION
5.1 An update of these figures will be provided on a 6 monthly basis. 
6.0 IMPLICATIONS
6.1 Policy:  None
6.2 Financial: None
6.3  Legal: None
6.4  HR:  None
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics 
6.5.2   Socio-economic Duty 
6.5.3  Islands 
6.6 Climate Change: None 
6.7 Risk: none 
6.8  Customer Service: None 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support
Policy Lead Kieron Green
2nd October 2023                                           
For further information contact: Sheila MacFadyen Ext: 4265 
Appendix 1 – STATISTICS ON NUMBER OF TAXI LICENCES – ARGYLL AND BUTE – October 1
2023 
Appendix 2 - STATISTICS ON NUMBER OF PRIVATE HIRE CAR LICENCES (with addresses in
the areas) – ARGYLL AND BUTE –Oct 2023  
Page 31

Page 32

Appendix 1
STATISTICS ON NUMBER OF TAXI LICENCES – ARGYLL AND BUTE – October 2023 
Area No. Taxis
referenced in
LVSA 
Report 2019
No. Licences
lapsed since
LVSA report
New licences
granted since
LVSA report
Licences
surrendered
since LVSA
report
Current Total No. Licences
as at Sept
2023       
Bute & Cowal  57
Mistake on report
Actual no. 54
0 1 0 55  55       
Helensburgh &
Lomond
48 5 12 6 49 49       
Mid
Argyll,Kintyre &
Islay
24 1 1 1 23 23       
Oban, Lorn &
Isles 
52 3 4 2 51 51
Page 32

Page 33

Appendix 2
STATISTICS ON NUMBER OF PRIVATE HIRE CAR LICENCES (with addresses in the areas) – ARGYLL AND BUTE –Oct 2023 
Area No. Private Hire
Car referenced
in LVSA 
Report 2019
No. Licences
lapsed since LVSA
report
New licences
granted since
LVSA report
Licences
surrendered
since LVSA
report
Current Total No. as at
September
2023       
Bute & Cowal  1 2 5 0 4 4       
Helensburgh &
Lomond
14 8 7 5 8 8       
Mid Argyll,Kintyre
& Islay
37 11 15 5 33 33       
Oban, Lorn &
Isles 
16 3 2 4 10 10
Page 33

Page 34

This page is intentionally left blank

Page 35

Argyll and Bute Council
Development and Economic Growth 
Delegated or Committee Planning Application Report and Report of handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning Permission in
Principle 
Reference No: 23/00652/PP
Planning Hierarchy: Local Application
Applicant: Ms Gail Crawford
Proposal: Alterations and extensions
Site Address: 4 West Lennox Drive Helensburgh Argyll And Bute G84 9AD  
DECISION ROUTE   
Local Government Scotland Act 1973   
(A) THE APPLICATION 
i) Development Requiring Express Planning Permission
Alterations and extensions
Ground engineering works to repair and alter surface water drainage within the site
ii) Other Specified Operations
None 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it is
recommended that planning permission be granted subject to the conditions and reasons
appended to this report.
______________________________________________________________________________ 
(C) HISTORY: 
12/01550/TPO - Felling of one Cypress tree and one Silver Birch tree - Agreed 21.08.2012 
18/01894/TPO - Proposed felling of 2 trees- Agreed 13.09.2018       
(D) CONSULTATIONS: 
Environmental Health - Helensburgh And Lomond – 28.09.2023 -  No objection subject to
conditions 
Roads Helensburgh And Lomond - 31.07.2023 – No objection 
Page 35 Agenda Item 6

Page 36

Historic Environment Scotland - 10.07.2023 – No objection – consultation response notes; 
The Hill House is several streets away, with no inter-visibility with 4 West Lennox Drive, and is not
likely to experience any impacts on its setting. As well as Red Towers, we have also considered
potential impacts on nearby Category A-listed Brantwoode on Munro Drive West. We have
considered how the surroundings of Red Towers and Brantwoode contribute to an understanding,
appreciation, and experience of their cultural significance and do not think the proposed extensions
at 4 West Lennox Drive would have a significant adverse impact on their settings. 
Helensburgh Community Council - 10.07.2023 – objection – consultation response summarises; 
This planning application should be rejected by A&BC. The design of the extension to ‘Redholm’s’
western elevation is unattractive and inappropriate. It will make the house appear lop-sided and
destroy the attractive symmetry from its present central relationship with the site overall. And, it is
likely there will be serious negative impacts on the amenity of its ‘Whincroft’ neighbours. Finally, it
will damage – not enhance – the contribution ‘Redholm’ makes to the HCCA. Because of the
strongly-held, vociferous and well-argued opposition from neighbouring residents and with
‘Redholm’ sitting in the HCCA HCC asks that this application be determined by a public hearing of
Argyll & Bute Council’s PPSL committee. And not be behind closed doors. The residents deserve
no less and have full support of Helensburgh Community Council in their opposition to this
planning application. 
Built Heritage Conservation Officer - 23.06.2023, 03.08.2023, 26.09.2023 & 05.10.2023 – The
conservation officer’s key responses are detailed within the main body of this report. 
(E) PUBLICITY: 
Advert Type: Listed Building/Conservation Advert               Expiry Date: 29.06.2023 
(F) REPRESENTATIONS: 
A total of 29 representations have been received from third parties. 28 of these are
objections to the proposal and the remaining one is a representation. 
i) Representations received from: 
Objection 
Suzanne Hamilton Whincroft 2A Upper Colquhoun Street Helensburgh  07.06.2023,
16.08.2023, 22.09.2023, 05.10.2023
Scott Hamilton Whincroft, 2A Upper Colquhoun Street Helensburgh Argyll And Bute G84
9AQ 07.06.2023, 05.10.2023
Lesley Carruthers Address Not Provided    13.06.2023
Ron Cromar Lower Culverden 2 West Lennox Drive Helensburgh Argyll And Bute
13.06.2023
Anne Cromar Lower Culverden 2 West Lennox Drive Helensburgh Argyll And Bute
13.06.2023
Russell Vallance Redtowers 4 West Douglas Drive Helensburgh Argyll And Bute
08.06.2023, 30.08.2023
Sally Butt Upper Culverden 2A West Lennox Drive Helensburgh Argyll And Bute
13.06.2023, 31.08.2023
Gillian Sproul Redtowers 4 West Douglas Drive Helensburgh Argyll And Bute 08.06.2023,
30.08.2023
Corinne Henderson Brantwoode  4 Munro Drive West  Helensburgh  G84 9AA 12.06.2023,
05.10.2023
Ruth Munro 2 Upper Colquhoun Street Helensburgh Argyll And Bute G84 9AQ 12.06.2023
Page 36

Page 37

David Henderson Brantwoode  4 Munro Drive West  Helensburgh  G84 9AA 12.06.2023,
20.07.2023, 05.10.2023
Theresa Fury 11 Upper Colquhoun Street Helensburgh Argyll And Bute G84 9AQ
01.07.2023
Michael Davis 79 Main Street Ochiltree East Ayrshire KA18 2PE 10.07.2023
Sonia Sharp 17 Harris Grove East Kilbride Glasgow G75 8TU 24.06.2023
John Butt Upper Culverden 2A West Lennox Drive Helensburgh Argyll And Bute
13.06.2023, 31.08.2023
Neil Douglas 4 Upper Colquhoun Street Helensburgh Argyll And Bute G84 9AH 15.07.2023
Max Carruthers 5 Upper Colquhoun Street Helensburgh Argyll And Bute G84 9AQ
13.06.2023
Alastair Wilson 7 Upper Colquhoun Street Helensburgh Argyll And Bute G84 9AQ
04.06.2023, 05.10.2023
Janette Wilson 7 Upper Colquhoun Street Helensburgh Argyll And Bute G84 9AQ
12.06.2023
Ruth Munro 2 Upper Colquhoun Street Helensburgh Argyll And Bute G84 9AQ 13.06.2023
Liliana Sheychenko 6 West Munro Drive Helensburgh Argyll And Bute G84 9AA 08.06.2023
Mr Garry Sharp 17 Harris Grove East Kilbride Glasgow G75 8TU 23.06.2023
John Shelton 3 West Douglas Drive Helensburgh Argyll And Bute G84 9AL 26.06.2023,
18.07.2023, 11.06.2023, 25.09.2023, 28.09.2023, 02.10.2023
San Choi Wong 1 West Douglas Drive Helensburgh Argyll And Bute G84 9AL 13.06.2023
Sally Shelton 3 West Douglas Drive Helensburgh Argyll And Bute G84 9AL 13.06.2023,
28.09.2023
Sheila Clarke 25 Larchfield Colquhoun Street Helensburgh Argyll And Bute 01.07.2023
Alistair McLuskey 6 West Munro Drive Helensburgh Argyll And Bute G84 9AA 05.07.2023,
07.06.2023, 24.09.2023, 02.10.2023 
Representation
Gary Mulvaney No Address Given    16.08.2023 
ii) Summary of issues raised: 
Note that the massing of the proposed extensions is not in keeping with the existing
property 
Comment; Please see full assessment below 
Concern that the modern extensions will be out of keeping with the existing traditional
property 
Comment; Please see full assessment below 
Concern about the impact of the proposals on the setting of the nearby A listed properties
as well as the neighbouring B listed property 
Comment; Please see full assessment below 
Note that the footprint of the proposed extension and garage will negatively affect the
existing surface water drainage for the site 
Comment; The applicants have submitted drainage plans which indicate proposed repairs
and alterations to the existing drainage which are considered acceptable. The increased
size of the built element on the site is approximately 80sqm which is not considered to be
significant enough to result in the requirement for additional surface water drainage 
Concern that the proposed drainage for surface water is insufficient 
Comment; Plans have been submitted to show a re-routed and repaired method of surface
water drainage for the site which will tie back into the existing surface water drainage for
Page 37

Page 38

the site. I have been to site and viewed the issues with the current broken surface water
drainage and I am content that the proposed alterations to reinstate this are sufficient. As
this is a proposed extension and not a new build there is no requirement for the applicants
to install a new SUDS system. They do however require consent to alter the existing
drainage which is broken given this involves engineering works. They intend to do this by
digging a new french drain at the rear of the site to pick up the broken field drains which
where discharging water into the solum of the property and then route the new field drain to
the front of the property to tie in with the existing drainage discharge 
Concern that the existing combined sewerage pipe could be compromised by the proposed
repairs and alterations to surface water drainage 
Comment: this is noted however, should this occur then this would be a private civil matter 
Concern that the proposed hard landscaping will cause further issues with surface water
drainage 
Comment: this is noted and I would note that a safeguarding condition should be added to
the decision notice requiring that a scheme of hard and soft landscaping is submitted to and
approved by the authority prior to works starting on site and that any hard landscaping
proposed must be permeable 
Concern that the proposed extension and drainage works will affect the roots of an
important copper beach tree located within the neighbouring garden   
Comment; This is noted and I have visited the site to understand where the extension will
lay in relation to the tree roots. It is confirmed that the proposed extension is out with this
trees canopy. However, a safe guarding condition will be added to the decision notice
requiring that this tree is protected at all times during construction works. It is also noted
that a TPO is being sought by the authority to further safeguard this tree 
Concern that the proposed extension will result in the overshadowing and loss of privacy to
neighbouring properties 
Comment; Please see full assessment below 
Note that trees have been removed within the proposals site without consent 
Comment; This is being dealt with as a separate enforcement matter 
Note that the property is not as neglected as the application portrays 
Comment; I have visited site and viewed the property both internally and externally and
therefore have a good understanding of the current state of the property to inform my
recommendations 
Note that the existing rooms on the floor plans are mislabelled by way of an existing study
being marked as a bathroom 
Comment; As the property is not listed any internal alterations to the existing property do
not require consent 
Concern that the trees indicated on submitted plans are not correctly shown 
Comment; I have visited the site and therefore have a good understanding of the existing
trees within the site and surrounding the property 
Concern in regards to unauthorised ground works that have taken place on the site and are
yet to be rectified 
Page 38

Page 39

Comment; This is being dealt with as a separate enforcement matter 
Concern that the drawings submitted do not show the finished external ground levels on the
site in particular to the rear where the unauthorised ground works have taken place 
Comment; The applicants have provided updated sections which adequately show the
proposals for these areas 
Concern that the viewpoints used by the applicants in showing the impacts of the proposal
on the wider conservation area are inaccurate 
Comment; I have visited the site and the surrounding conservation area with the design
and conservation officer and therefore have a good understanding of the surrounding
conservation area and viewpoints used and do not consider the viewpoints used by the
applicant to be inaccurate 
Note that neighbours would request a site visit from committee members so they best
understand the site prior to determining the application 
Comment; This is noted and members will be informed that this has been requested 
Note that neighbours also request a public hearing to voice their concerns 
Comment; This is noted and members will be informed that this has been requested
however, we are not recommending this 
Concern that extension will overlook neighbouring properties and in particular the first floor
terrace will overlook the front garden and bedroom window of Whincroft (2a Upper
Colquhoun). 
Comment; Please see full assessment below 
Concern that the property might be sub-divided in the future 
Comment; no subdivision has been applied for or indicated at this time. Should the
applicants chose to peruse this in the future, this would result in the need for a further
application 
Concern that the proposals will harm the character of the surrounding conservation area 
Comment; The design and conservation officer as well as Historic Environment Scotland
have been consulted on the proposals and I will summarise their views in my assessment
below 
Concern that the precedents used by the applicants within their submission are not within
the immediate conservation area 
Comment; This is noted   
Concern that the setting of the A listed Hill House will be effected by the proposals indirectly
as visitors will pass the site on route to the Hill House and this has not been considered 
Comment; Historic Environment Scotland have been consulted on the proposals (summary
of their comment in Section D above and I will summarise their views in my assessment
below in relation to the setting of the Hill House 
Concern that the planting within the site does not positively contribute to the wider
conservation area 
Page 39

Page 40

Comment; A safe guarding condition will be appended to the decision notice to require that
a scheme of planting is submitted to and approved by the authority prior to works starting
on site. It is further noted that the bio-diversity officer will be consulted on this 
Note that the drainage is shared within neighbouring title deeds 
Comment; this is a private civil matter 
Concern that the perforated metal cladding which is to be used on section of the first floor
extension will affect the privacy of neighbouring properties   
Comment; This is noted however it is not considered that this material will allow the glazing
to act as a window as it is a form off screening. A safeguarding condition will be added to
the decision notice requiring samples of all external materials are submitted to and
approved by the authority prior to work starting on site and a further safeguarding condition
will be added to require that the gazing behind this screening is to be opaque 
Concern about the scale of the extensions in terms of overdevelopment of the plot as a
whole 
Comment; This is noted however, the proposed extensions are not considered to be
overdevelopment of the site as the resultant built element on the site is not more than 33%
of the overall site 
Note that the removal of the existing chimneys, removal of the existing single story
extension and alterations to the existing apex roof will affect the character of the existing
property and wider conservation area 
Comment; Please note that the applicants have amended their proposals and have omitted
the proposed roof alterations, they have also amended the design to show to the retention
of the two front chimneys, please see full assessment below for further details on this   
Note that the revisions to retain two of the chimneys is still not acceptable 
Comment; Please see full assessment below 
Concern about the proposed repairs to the stonework 
Comment; Please see full assessment below, it is also noted that any replacement to the
stonework will require samples by way of a recommended condition and that no consent is
required to undertake repairs to the property as it is not listed such as the proposed lithomix
repairs 
Concern that the proposed rear canopy will affect the central stained glass window to the
rear elevation 
Comment; This is noted however the applicants have submitted drawings to show that the
canopy proposed will not harm the stained glass window as it is set proud 
Concern that approval of this application would set a precedent 
Comment; This noted however each application is assessed on its own merits 
Note that the flat roof extensions are not in keeping with the surrounding conservation area
or the existing property 
Comment; Please see detailed assessment below 
Page 40

Page 41

Note that the proposed external materials are not in keeping with the existing building or
wider conservation area and note that traditional material should be used 
Comment; Please see detailed assessment below 
Note that the existing detached garage should not be demolished to preserve the character
of the conservation area 
Comment; The existing garage is not considered to enhance the wider conservation area
and is of low quality design, the replacement of this garage with a more appropriate
alternative would be considered to enhance the wider conservation area 
Concern that the proposed garage is larger in scale, has a flat roof and does not have the
same level of separation that the existing garage affords 
Comment; Please see detailed assessment below 
Concern that the proposed gym which is close to neighbouring properties will result in noise 
Comment; Environmental health have been consulted and have raised no objection in this
regard 
Note that the internal fireplaces could be lost 
Comment; the existing property is not listed therefore no permission is required for any
internal alterations 
Note that the existing windows are in good condition and do not require replacement 
Comment; this is noted however I have visited site and viewed the condition of the
windows in person, the proposed replacements as detailed are timber sash and case
replicas but with double glazing, these are considered to be high quality 
Note that the applicants have noted that no trees or on or adjacent to the proposals on the
application from and that the drawings showing trees are also incorrect 
Comment; I have visited the site and therefore have a good understanding of the existing
trees within the site and surrounding the property and please see the detailed assessment
below 
Note that the property is not in the sole ownership of the applicant as indicated on the
application form 
Comment; This is a private civil matter 
Note that the application form also notes that no work has started on site and this is not
correct as ground works have begun 
Comment; This is noted and the unauthorised works are being dealt with as a separate
enforcement matter 
Concern that the proposals will negatively affect the daylight levels to surrounding
properties 
Comment; Please see full assessment below 
Note that one of the gate posts has been dismantled and set aside 
Page 41

Page 42

Comment; this is noted, the applicants have updated the drawings to show this gate post
being reinstated on completion of the works 
Note that the removal of two number windows to the East Elevation of the existing building
is unacceptable 
Comment; Please see full assessment below 
Note that the original internal ceiling details should not be lost 
Comment; the existing property is not listed therefore no permission is required for any
internal alterations 
Concern in regards to the use of the temporary enclosure of the Hill House as a design
precedent 
Comment; This would not be taken into account as this is a temporary structure 
Query as to how far the proposed extension will be to the adjacent properties boundary 
Comment; Drawings indicate that the ground floor of the proposed extension will be
approximately just over 5m from the boundary 
Note that the boundary hedge as shown on the drawings is in joint owner ship and not in
the sole ownership of the applicants property’s as indicated on the drawings 
Comment; This is a private civil matter 
Note that the original ridge tiles should not be replaced with zinc 
Comment; Please see full assessment below 
Representations are published in full on the planning application file and are available to view
via the Public Access section of the Council’s website. 
(G) SUPPORTING INFORMATION 
i) Environmental Statement: N/A 
ii) An appropriate assessment under the Conservation (Natural Habitats) Regulations 1994:
N/A 
iii) A design or design/access statement: The applicants have provided a summary of their
proposals within the opening statement of their original and revised D&A statement as
follows; 
The proposal is a full internal refurbishment and large contemporary extension to the rear of an
unlisted Victorian villa which sits in the Hill House Conservation Area. The existing property
consists of a series of grand rooms with significant decorative features, arranged in a formal
manner reflective of the time in which it was built. In addition to a full renovation of the existing
building to suit a growing family, the client’s brief required a new open-plan, light filled kitchen
and dining space suited to modern living, with a connection to the garden. The main design
changes are proposed for the ground floor. We propose the removal of the existing extension
to the north-west corner of the property, allowing us to radically transform the internal space,
opening up the corner of the site to create a large central heart to the new home. This new
generous open-plan layout will aim to rationalise how one moves and circulates throughout the
house, which currently is disadvantaged by the disconnected cellular spaces of the traditional
layout. Albeit striking, the scheme seeks to deliver a balanced contemporary interpretation of a
house extension to a traditional Scottish Architecture that reflects and respects the original
Page 42

Page 43

guise of the building by modernising, yet not overpowering it. To create such a building of this
flexibility, a high level of nuanced design in terms of materiality and massing articulation had to
be considered. There are also a number of holding works we have proposed to the house to
ensure its long term survival; 
- Removal of redundant chimneys
- Localised roof repairs
- Refurbishment / Replacement of existing windows
- Localised Sandstone repairs
- Damp treatment 
This document also includes; a contextual analysis, an overview of the proposals, a visual
impact assessment and the proposed tree protection measures. 
iv) A report on the impact of the proposed development e.g. Retail impact, transport impact,
noise impact, flood risk, drainage impact etc: N/A 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:  N 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or
32: N 
(J) Section 25 of the Act; Development Plan and any other material considerations over
and above those listed above which have been taken into account in the assessment
of the application 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 16 – Quality Homes
NPF4 Policy 22 – Flood Risk and Water Management 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our Environment 
LDP 9 – Development Setting, Layout and Design 
Local Development Plan Schedules 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted March
Page 43

Page 44

2016 & December 2016) 
Natural Environment
SG LDP ENV 6 – Impact on Trees / Woodland 
Historic Environment and Archaeology
SG LDP ENV 16(a) – Impact on Listed Buildings
SG LDP ENV 17 – Development in Conservation Areas and Special Built Environment
Areas (SBEAs)
SG LDP ENV 18 – Demolition in Conservation Areas 
Sustainable Siting and Design
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption
SG LDP SERV 2 – Incorporation of Natural Features / SuDS 
(ii)  List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
3/2013. 
 Third Party Representations
 Consultation Reponses
 Planning History
 ABC draft Technical Note – Argyll and Bute Windows (April 2018)  
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The Examination
by Scottish Government Reporters to the Argyll and Bute Local Development Plan 2 has
now concluded and the Examination Report has been published (13th June 2023). The
Examination Report is a material consideration of significant weight and may be used as
such until the conclusion of the LDP2 Adoption Process. Consequently, the Proposed
Local Development Plan 2 as recommended to be modified by the Examination Report
and the published Non Notifiable Modifications is a material consideration in the
determination of all planning and related applications. 
Spatial and Settlement Strategy
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings
Policy 17 – Conservation Areas 
Sustainable Communities
Policy 61 – Sustainable Urban Drainage Systems (SUDS) 
High Quality Environment
Policy 77 – Forestry, Woodland and Trees 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment: No EIA is required. 
Page 44

Page 45

(L) Has the application been subject of statutory pre-application consultation (PAC):   
No Pre-application consultation required . 
(M) Has a sustainability check list been submitted: N/A 
(N) Does the Council have an interest in the site: No   
(O) Requirement for a pre-determination hearing: No   
(P)(i) Key Constraints/Designations Affected by the Development:
 Conservation Area
 Listed Buildings 
(P)(ii) Soils
Agricultural Land Classification:  Built Up Area
Peatland/Carbon Rich Soils Classification: N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? No
Would the development restrict access to
croft or better quality agricultural land?
N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
No 
Does the proposal include any replacement
or compensatory planting?
N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application Brownfield 
ABC LDP 2015 Settlement Strategy 
Main Town Settlement Area 
ABC pLDP2 Settlement Strategy
Settlement Area 
ABC LDP 2015 Allocations/PDAs/AFAs
etc: N/A
ABC pLDP2 Allocations/PDAs/AFAs etc: N/A 
(P)(v) Summary of Assessment and summary of determining issues and material
considerations: 
Site Description 
Planning permission is sought for the alterations and extensions to an existing detached
two storey traditional villa located at; 4 West Lennox Drive, Helensburgh. The existing
property is located within the Helensburgh Hill House Conservation Area and is directly
adjacent to a category B listed property. Located on the opposite side of the street from the
site is A listed Brantwoode and adjacent to this is B listed Strathmoyne. Furthermore,
located on the street behind the site is A listed Red Towers and adjacent to this is B listed
Tordarroch. It is noted that historically the site was subdivided and a modern dwelling was
Page 45

Page 46

built within the rear garden grounds. The area surrounding the property is a well-
established residential area consisting of several listed properties as noted above, set with
large plots as well as some modern dwellings which have been built within the garden
grounds of the original villas. 
The house plot measures approximately 2165sqm, the existing house including the single
storey element has a footprint of approximately 216sqm, with the single storey element
having a footprint of 55sqm. The existing garage has a footprint of approximately 30sqm
and the timber sheds have a combined footprint of approximately 18sqm bringing the total
built element on site to approximately 264sqm. The existing house is sited towards the rear
of the plot with a large front garden. The site gently slopes downhill from North to South. 
Proposal Description
The proposal seeks to remove the single storey hipped roof element and replace this with a
new two storey extension. This proposed extension has a footprint of 90sqm whereas the
original single storey element had a foot print of 55sqm. The proposal also sees to remove
the existing garage which has a footprint of 30sqm and replace this with a larger garage /
gym which has a footprint of 70sqm. The proposal also seeks to introduce a covered
external ‘link’ canopy between the garage / gym and the new extension, this has a footprint
of 25sqm. The proposals also seek to remove the timber garden sheds. In summary the
resultant total built element on the site would be approximately 346sqm in lieu of the
264sqm at present (an increase of 82sqm). This would represent less than 20% of the site
being built up which is well under the 33% threshold considered to be overdevelopment. It
is also noted that the footprint of the proposed first floor of the extension extends to
approximately 50sqm. 
The single storey elements of the proposals have a roof height of 3.2m and the two storey
element has a roof height of 6.4m. In contrast the existing single storey element has an
eaves height of approximately 2.5m and a ridge height of approximately 4.3m. 
It is also proposed to alter the existing property on site by replacing 35 existing windows,
repairing any stained glass windows, repairing the existing masonry / render, repairing /
replacing the existing cast iron rainwater goods to match existing, removal of two first floor
windows to West elevation and openings infilled with reclaimed sandstone, removal of
existing ground floor window opening to West elevation and opening to be utilised as an
internal doorway into the proposed extension, removal of a double ground floor window to
North elevation and opening infilled with reclaimed sandstone, removing two of the four
chimneys and also roof repairs including lead repairs and replacement, replacement of the
existing cement ridge tiles with zinc ridge sheets and replacement of the existing chimney
pots. It is noted that the applicants have revised their proposals as originally they had
sought to remove three chimneys and had also sought to alter the roof design. The
proposals have been revised to omit the originally proposed roof design alterations and
also now seek to remove two chimneys as opposed to the three originally applied for. The
proposed window replacements are double glazed timber sash and case to match the
design of the originals. 
The proposed external finishes for the extensions and garage are as follows; external walls
including retaining walls (ground floor) - muted pink colour external render finish, external
walls (first floor) - perforated 'scalloped' powder coated aluminium sheets colour  muted
green, external canopy - dark weathering steel finish, flat roofs - dark grey Sarnafil,
windows – framed PPC aluminium, first floor terrace balustrade – glazed and roof flashing
to garage - PPC flashing to colour match external canopy. 
Summary of Assessment
The proposed extensions and replacement garage are located to the sides and rear of the
existing property. In terms of the design of the proposed extensions these are
Page 46

Page 47

contemporary in materials and massing and seek to create a clear and defined stance on
what is new and what is old. In this regards the following polices are considered. 
It should be noted that the full assessment is contained within Appendix 1 of this report. 
NPF4 Policy 14 sets out 6 qualities of successful places. Of particular note is ‘Distinctive –
supporting attention to detail of local architectural styles and natural landscapes to be
interpreted, literally or creatively, into designs to reinforce identity.’ NPF4 Policy 16 states
that householder developments will be supported where they ‘do not have a detrimental
impact on the character or environmental quality of the home and the surrounding area in
terms of size, design and materials’. 
LDP Sustainable Siting and Design Principles requires that the development should
integrate into the existing built form, and also to reflect the character of the original
dwellinghouse. 
Furthermore the design and conservation officer has noted within her consultation response
that; ‘LDP2 design policy has changed from the current LDP and is generally more
supporting of contemporary design. Rather than requiring that the character of the original
dwellinghouse is reflected, LDP2 Policy 10 requires that development responds
appropriately to the site and wider context but that materials are legible as being
contemporary design. Additionally, LDP2 places a requirement to consider the embodied
energy and durability of proposed materials.’ 
The proposed new extension seeks to use the heavier appearing finishes to the ground
floor with the lightweight materials to the first floor. This is to make the design appear lighter
as it increase a storey. This coupled with the reduced footprint of the propped first floor and
the set back at first floor allows the proposed first floor extension to appear subservient to
the existing property and does not dominate it. 
NPF4 policy 7 (d) requires that the character and appearance of the conservation area be
preserved or enhanced. It sets out relevant considerations of: architectural and historic
character; existing density, built form and layout; and context and siting, quality of design
and suitable materials. LDP SG ENV 17 also requires that the character or appearance of
the conservation area be preserved or enhanced, and LDP2 Policy 17 is substantially the
same. 
In terms of the proposed window replacements I would the design and conservation officer
has provided comments on this and notes; ‘There is a preference for retaining historic
windows where possible however the policy test is whether the proposal preserves the
character or appearance of the conservation area. In this case I must concede that suitable
replacements could be fitted without being contrary to this policy. To clarify, the house
makes a contribution towards Helensburgh’s conservation area but as it is an individual
house type rather than a uniform townscape block, and as the building is not listed and
there is no requirement to preserve the special historic or architectural interest of the
building, whether or not the existing windows remain and are repaired, or new high quality
windows that have a similar appearance, will not affect the overall character or appearance
of the conservation area.’ 
In relation to the existing building and in terms of the removal of the existing single storey
element along with the existing non-original detached garage the Design and Conservation
Area officer has further noted; ‘Justification has been provided in terms of the viability of
repair of the garage and side extension including the limited potential of thermal upgrades.
In this case I therefore have no further comment on, or objection to, their removal.’’ 
In terms of the proposed alterations to the existing building is it considered that these when
considered cumulatively do not have an adverse effect on the character of the existing
Page 47

Page 48

property nor on the wider conservation area. Again the design and conservation officer has
further comment on this as follows; ‘The policy test is whether the development would
preserve or enhance the character or appearance of the conservation area, and whether it
would preserve the character, special architectural or historic interest of the setting of any
listed buildings. As noted in my consultation responses I feel that the design of the
contemporary extension is well thought through and is a positive contribution within the
conservation area. I have had concerns over chimney removal and roof reconfiguration and
these have been discussed with the agent. The planning officer and myself agreed that the
cumulative impact pushed the change in character and appearance to be contrary to policy,
however the settled proposal of retaining 2 chimneys and the rear roof reconfiguration is in
my view, satisfactory in policy terms as the overall character and appearance of the
conservation area will be preserved. Whilst the contemporary extension obviously changes
the appearance of the house, I believe that it is complimentary and complies in policy terms
with NPF4 Policy 7 (d) and LDP2 Policy 16.’ 
External landscaping has also been proposed which is mix of dark and light grey pavers
and concrete along with raised planting beds and areas of indicated planting. This
information is limited and I would propose to attach a safeguarding condition to any
approval requiring that a scheme of hard and soft landscaping is submitted to and approved
by the authority prior to works starting on site. This would include any planting which would
be considered by the biodiversity officer. I would also note that any hard landscaping would
require to be permeable as to not affect the surface water drainage. A retaining wall is also
proposed along the Northern boundary that will return around the East and West
boundaries to the rear of the existing property. Within the site there are approximately 12
trees that bound the eastern boundary, a single large tree at the southern boundary and 3
trees along the western boundary, no works or removals have been proposed to any trees
within the site. In terms of the existing trees on site and any neighbouring trees that may be
effected by the proposals such as the large copper beach tree within the adjoining garden
of 2 Upper Colquhoun Street, Helensburgh which will have its roots within the sites
boundary, it is recommended that these trees will be protected by safeguarding conditions
that special protection measures are put in place and maintained during all construction as
follows; no excavation shall be undertaken below the canopy of any tree to be retained
including the neighbouring copper beach tree and that a 1.2 metre high fence is to be
erected at least one metre beyond the canopy of each tree to be retained including the
neighbouring copper beach tree. 
It is noted that Historic Environment Scotland have been consulted on the proposals due to
the possible effects on surrounding listed properties and they have noted; ‘The Hill House is
several streets away, with no intervisibility with 4 West Lennox Drive, and is not likely to
experience any impacts on its setting. As well as Red Towers, we have also considered
potential impacts on nearby Category A-listed Brantwoode on Munro Drive West. We have
considered how the surroundings of Red Towers and Brantwoode contribute to an
understanding, appreciation, and experience of their cultural significance and do not think
the proposed extensions at 4 West Lennox Drive would have a significant adverse impact
on their settings.’ 
NPF4 Policy 16 and LDP SG Sustainable siting and design guide require that proposals do
not have a detrimental effect on neighbouring properties in terms of overshadowing or
overlooking. It is considered that the proposed extensions will not effect daylight into
neighbouring properties or gardens by way of overshadowing as they are set back far
enough from the boundaries that when the 45 degreed daylight test is applied the existing
hedge screening mitigates any potential impacts including the first floor element. It is also
noted that window to window and privacy issues have been considered and I would confirm
that following; there are no privacy issues arising form the proposed areas of additional
glazing from the front elevation, there are no privacy issues arising on the East elevation as
no additional glazing is proposed, to the rear at ground level a double window will be
removed and a large area of glazing installed to the proposed extension this will not create
any privacy issues as there is existing screening along the Northern boundary and to the
Page 48

Page 49

first floor of the proposed extension glazing is proposed to the new shower room which is
over 18m from the neighbouring property to the rear, furthermore, the shower room is not a
habitable room (a safeguarding condition is proposed to require that this window be of
opaque glazing), to the West elevation at ground level glazing is proposed to the gym this is
over 18m from neighbouring properties and glazing is also proposed to the ground floor
extension, the existing extension to be removed had glazing on this elevation also and the
new glazing is successfully screened by existing planting, lastly to the first floor of the
proposed extension on the West elevation perforated steel cladding is proposed, this
cladding is a form of screening and is not considered to create any issues with privacy (a
safeguarding condition has been recommend to request samples of this material to be
approved prior to works starting on site – this again will be to ensure that this screening is
adequate it is also recommended that a safeguarding condition is added that requires the
glazing behind this section of screening be opaque), furthermore, two existing windows are
to be removed from this elevation which again mitigates privacy concerns. Lastly the first
floor terrace that is proposed is minimal in size and is screened by the existing large copper
beach tree located within the neighbouring garden (subject to separate TPO consideration),
furthermore, there is an existing level of overlook from the first floor windows, therefore, the
limited additional element of overlooking is considered to be within acceptable limits. 
Lastly, I would add that during the determination process the applicants have submitted
plans to show a re-routed and repaired surface water drainage scheme for the site. It is
noted that consent is not required for the repair of existing drainage but is required if there
are proposed alterations to this. As such the applicant has submitted drawing to show the
surface water drainage alterations. I have been to site and viewed the issues with the
current broken surface water drainage and I am content that the proposed alterations to
reinstate and alter this are sufficient. As this is a proposed extension and not a new build
there is no requirement for the applicants to install a new SUDS system. The submitted
drawings show a new french drain running along the northern boundary of the rear site to
pick up the broken field drains which where discharging water into the solum of the property
and then route the new field drain to the front of the property to tie in with the existing
drainage discharge. These proposals would accord with NPF4 Policy 22, SG LDP SERV 2
and LDP2 Policy 61. 
To summarise the proposed extensions and replacement garage are not considered to be
overdevelopment of the site, the proposed design is considered to be subservient to the
donor house as does not dominate it, the clear and deliberate  design delineation between
the old and the new is welcomed as is in line with policy, the proposed materials are high
quality and respect the character of the existing property and wider conservation area, it is
not considered that the proposals negatively affect the setting of surrounding listed
properties and it is considered that this contemporary extension to a traditional villa is in
keeping with the character of the wider conservation area and successfully enhances it.
Furthermore, the proposals raise no issues in terms of overlooking, loss of daylight / privacy
or amenity to surrounding properties. It is therefore considered that the proposal is in
accordance with NPF 4 polices; 1, 2, 3, 6, 7,14, 16 and 22 and Policies LDP STRAT 1, LDP
DM1, LDP 3, LDP 9, SG LDP ENV 6, SG LDP ENV 16(a), SG LDP ENV 17, SG LDP ENV
18, SG LDP SERV 2 and SG LDP - Sustainable Siting and Design Principles of the Argyll &
Bute Council Local Development Plan as well as Policies 01, 04, 05, 08, 09, 10, 15, 16, 17,
61 and 77 of LDP 2. Taking account of the above, it is recommended that planning
permission be granted.
______________________________________________________________________________
(Q) Is the proposal consistent with the Development Plan: Yes 
(R) Reasons why Planning Permission or a Planning Permission in Principle should be
granted: 
The proposal accords with NPF 4 polices; 1, 2, 3, 6, 7, 14, 16 and 22 and Policies LDP
STRAT 1, LDP DM1, LDP 3, LDP 9, SG LDP ENV 6, SG LDP ENV 16(a), SG LDP ENV 17,
Page 49

Page 50

SG LDP ENV 18, SG LDP SERV 2 and SG LDP - Sustainable Siting and Design Principles
of the Argyll & Bute Council Local Development Plan as well as Policies 01, 04, 05, 08, 09,
10, 15, 16, 17, 61 and 77 of LDP 2 and there are no other material considerations which
would warrant anything other than the application being determined in accordance with the
provisions of the development plan. 
(S) Reasoned justification for a departure to the provisions of the Development Plan: 
No Departure 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland: No 
Author of Report: Emma Jane   Date: 18.09.2023 
Reviewing Officer: 
Kirsty Sweeney 
Area Team Leader
Dated: 29.09.2023 
Fergus Murray
Head of Development and Economic Growth
Page 50

Page 51

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00652/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. The development shall be implemented in accordance with the details specified on the
application form dated 23/04/2023, supporting information and, the approved drawings listed in the
table below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country Planning (Scotland)
Act 1997.  
Plan Title Plan Ref No Version Date Received
(PL)001 Existing
location plan &
Block plan
1 of 32 B 28.07.2023
(PL)002 Existing
ground floor plan
2 of 32 A 30.03.2023
(PL)003 Existing
first floor plan 
3 of 32 A 22.05.2023
(PL)004 Existing
roof plan 
4 of 32 B 18.09.2023
(PL)005 Existing
South elevation 
5 of 32 B 18.09.2023
(PL)006 Existing
West elevation 
6 of 32 B 18.09.2023
(PL)007 Existing
North elevation 
7 of 32 B 18.09.2023
(PL)008 Existing
East elevation 
8 of 32 B 18.09.2023
(PL)010 Proposed
location plan &
Block plan
9 of 32 C 18.09.2023
(PL)011 Proposed
ground floor plan 
10 of 32 B 28.07.2023
(PL)012 Proposed
first floor plan 
11 of 32 B 28.07.2023
(PL)013 Proposed
roof plan 
12 of 32 C 18.09.2023
(PL)014 Proposed
South elevation 
13 of 32 C 18.09.2023
(PL)015 Proposed
West elevation 
14 of 32 C 18.09.2023
(PL)016 Proposed
North elevation 
15 of 32 C 18.09.2023
(PL)017 Proposed
East elevation 
16 of 32 C 18.09.2023
(PL)018 Proposed
section A-A
17 of 32 A 28.07.2023
(PL)020 Existing
window schedule 
18 of 32 A 22.05.2023
(PL)021 Proposed 19 of 32 A 24.04.2023
Page 51

Page 52

window
replacements 
(PL)030 Existing
door schedule 
20 of 32 A 22.05.2023
(PL)040 Images of
areas for
demolition 
21 of 32 A 24.04.2023
(PL)050 Existing
section A-A
22 of 32 A 18.09.2023
(PL)051 Existing
section B-B
23 of 32 A 18.09.2023
(PL)052 Proposed
section C-C
24 of 32 A 18.09.2023
(PL)053 Proposed
section B-B
25 of 32 A 18.09.2023
(PL)054 Proposed
section C-C
26 of 32 A 18.09.2023
(PL)055 Proposed
section D-D
27 of 32 A 18.09.2023
(PL)056 Proposed
section E-E
28 of 32 A 18.09.2023
Proposed drainage
drawing 
29 of 32 C 28.07.2023
Windows design &
access statement 
30 of 32 A 24.04.2023
Design & access
statement 
31 of 32 B 28.07.2023
Visual impact
assessment 
32 of 32 A 22.09.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in accordance
with the approved details. 
2. Notwithstanding the effect of condition 1; Prior to work starting on site samples of the proposed
materials to be used for the external finishes of the development hereby granted consent shall be
submitted to and approved in writing by the Planning Authority prior to any work starting on site.
Samples to include; canopy finishes, render finish to external walls, retaining wall finish, garage
door finish, perforated 'scalloped' powder coated aluminium cladding finish, roof finish, window
frame finish and flashing finish. 
Reason:  In the interests of visual amenity and in order to integrate the proposal with its
surroundings. 
3. Notwithstanding the effect of condition 1; Prior to work starting on site full details of the design of
doors/windows to the proposed extension and garage shall be submitted to and approved in writing
by the Planning Authority in the form of drawings at a scale of 1:20. 
Reasons:  To ensure appropriate detailing and to maintain the overall quality and character of the
development and the surrounding environment. 
4. Notwithstanding the effect of condition 1; Prior to work starting on site samples of the natural
stone proposed to be used for window infills and repairs to the existing building shall be submitted
to and approved in writing by the Planning Authority.
Page 52

Page 53

Reason:  To ensure that the materials to be used on the external surfaces of the existing building
match the existing building. 
5. Notwithstanding the effect of condition 1; Notwithstanding the details on the approved plans the
window replacements to the existing building shall be vertically sliding timber sash and casement
windows.  Details of all the windows, including the size of windows, size of mullions, number of
astragals, which shall physically divide the window into separate panes, method of opening, depth
of recess and colour shall be submitted in the form of drawings scale 1:20 and shall be submitted
to and approved in writing by the Planning Authority prior to work starting on site. 
Reason:  In the interests of visual amenity and to ensure that the proposals do not adversely affect
the architectural and historic character of the building. 
6. Notwithstanding the effect of condition 1; Prior to work commencing on site full details of the
proposed reconstruction of the wall ends and any piers or gate posts and gate shall be submitted
to and approved in writing by the Planning Authority. 
Reason:  To ensure that the development is undertaken in a manner which minimises the visual
impact of the alterations in the streetscape and preserves as far as possible the integrity of the
boundary wall in question. 
7. Notwithstanding the effect of condition 1; Development shall not begin until details of a scheme
of hard and soft landscaping works has been submitted to and approved in writing by the Planning
Authority.  Details of the scheme shall include: 
i) location and design, including materials, of walls, fences and gates
ii) Existing landscaping features and trees/vegetation to be retained;
iii) soft and hard landscaping works, including the location, type and size of each individual
tree and/or shrub
iv) programme for completion and subsequent on-going maintenance. 
All the hard and soft landscaping works shall be carried out in accordance with the scheme
approved in writing by the Planning Authority.  All planting, seeding or turfing as may be comprised
in the approved details shall be carried out in the first planting and seeding seasons following the
commencement of the development unless otherwise agreed in writing with the Planning Authority. 
Any trees or plants which within a period of ten years from the completion of the development die,
for whatever reason are removed or damaged shall be replaced in the next planting season with
others of  the same size and species, unless otherwise agreed in writing with the Planning 
Authority. 
Please note that any hard landscaping proposed shall be permeable as to not impact on the
surface water drainage for the site. 
Reason:  To ensure the implementation of a satisfactory scheme of landscaping. 
8. Notwithstanding the effect of condition 1; During construction work on site, including the laying of
services, no excavation shall be undertaken below the canopy of any tree to be retained including
the copper beach tree located within the neighbouring garden of 2 Upper Colquhoun Street,
Helensburgh who's roots and canopy are partially within the application site. 
Reason:  To ensure that no damage is caused to trees during development operations. 
Page 53

Page 54

9. Notwithstanding the effect of condition 1; All existing trees on site shall be protected at all times
during the construction period by means of the erection of a 1.2 metre high fence in accordance
with Clause 8.2.2 of BS 5837 "Trees in Relation to Construction" at least one metre beyond the
canopy of each tree including the copper beach tree located within the neighbouring garden of 2
Upper Colquhoun Street, Helensburgh who’s roots and canopy are partially within the application
site. 
Reason:  The landscape features to be protected are important to the appearance and character
of the site and the surrounding area and are required to successfully integrate the proposal with its
surroundings. 
10. Notwithstanding the effect of condition 1; Prior to work starting on site, full details of any
external lighting to be used within the site or along its access shall be submitted to and approved in
writing by the Planning Authority.  Such details shall include full details of the location, type, angle
of direction and wattage of each light which shall be so positioned and angled to prevent any glare
or light spillage outwith the site boundary. 
Reason:  In order to avoid the potential of light pollution infringing on surrounding land
uses/properties. 
11. Notwithstanding the effect of condition 1; The first floor glazing to the North elevation (shower
room window) and the first floor glazing to the West elevation (behind the proposed screening) of
the proposed extension shall be of obscure glass and maintained in perpetuity in obscure glass to
the satisfaction of the Planning Authority. 
Reason:  In order to protect the privacy and amenity of adjacent properties. 
12. Notwithstanding the effect of condition 1; Prior to work starting on site details of the
replacement chimney pots to the existing building shall be submitted to and approved in writing by
the Planning Authority. 
Reason:  In the interests of visual amenity and to ensure that the proposals do not adversely affect
the architectural and historic character of the building. 
13. Notwithstanding the effect of condition 1; Prior to work starting on site identification and
assessment of all potential sources of nuisance, including noise/ vibration, dust, and any temporary
lighting provided, which may cause disturbance to nearby residents during the demolition /
construction process should be undertaken by the applicant. This should include consideration of
intended hours of operation, movement of vehicles, use of plant and storage of equipment and
materials on site.   
For all potential sources of nuisance the applicant will be required to provide a management plan
with details of suitable control measures to be put in place so as to ensure that construction does
not cause loss of amenity to local residents and/or statutory nuisance.   
Reason: In order to avoid sources of nuisance in the interest of amenity. 
14. Notwithstanding the effect of condition 1; In order to minimise, as far as necessary, the level of
noise and/or vibration to which nearby existing residents will be exposed during the construction
process the hours of operation of the site should be restricted to 08.00 to 18:30 Monday to Friday
and 08.00 to 13.00 on Saturdays.  There should be no operation on Sundays or Bank Holidays. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
Page 54

Page 55

NOTE TO APPLICANT 
n/a 
Page 55

Page 56

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 23/00652/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
A. Settlement Strategy 
1.1. The site is located within the Main Town Settlement Zone of Helensburgh as identified in the
Argyll and Bute Local Development Plan 2015 (LDP) wherein Policy LDP DM 1 gives
encouragement to sustainable forms of small scale development on appropriate sites. 
1.2. NPF 4 Policy 1 requires that significant weight be given the global climate and nature crises
when considering new development.  Policy 2 seeks to encourage, promote and facilitate
development that minimises emissions and adapts to impacts on climate change. NPF 4
Policy 5 aims to protect locally, regionally, national and internationally valued soils. 
1.3. The development is located within an identified settlement with access to community facilities
and public transport networks, consistent with the LDP Settlement Strategy, and as such
complies with the Sustainability criteria established by Policy LDP STRAT 1, and is compatible
with the provisions of NPF 4 Policy 1 in terms of addressing the Climate Crisis in principle. The
site is located within an established residential area and will not impact upon soil that has
material value. It is recommended that any planning permission will be subject to a model
planning condition. 
1.4. On the above basis, it is considered that there is a general presumption in favour of the
principle of this proposed development in terms of its location, nature and scale when
assessed against the policy provisions relating to the LDP Settlement Strategy and relevant
NPF 4 Policy. 
B. Location, Nature and Design of Proposed Development 
2.1 4 West Lennox Drive, Helensburgh is located within the Helensburgh Hill House Conservation
Area and is directly adjacent to a category B listed property. The existing property is a
detached unlisted two storey traditional villa. Located on the opposite side of the street is A
listed Brantwoode and adjacent to this is B listed Strathmoyne. Furthermore, located on the
street behind the site is A listed Red Towers and adjacent to this is B listed Tordarroch. It is
noted that historically the proposals site was subdivided and a modern dwelling was built within
the rear garden grounds. The area surrounding the property is a well-established residential
area consisting of several listed properties as noted above, set with large plots as well as some
modern dwellings which have been built within the garden grounds of the original villas. 
2.2 The existing plot measures approximately 2165sqm, the existing house including the single
storey element has a footprint of approximately 216sqm, with the single storey element having
a footprint of 55sqm. The existing garage has a footprint of approximately 30sqm and the
timber sheds have a combined footprint of approximately 18sqm bringing the total built element
on site to approximately 264sqm. The existing house is sited towards the rear of the plot with a
large front garden. The site gently slopes downhill from North to South and is bounded by
mature hedges to all boundaries. 
2.3 The proposal seeks to remove the existing single storey element to the side / rear of the
property and replace this with a new two storey extension. This proposed extension has a
footprint of 90sqm whereas the original single storey element had a foot print of 55sqm. The
proposal also sees to remove the existing garage to the side / rear of the property which has a
footprint of 30sqm and replace this with a larger garage / gym which has a footprint of 70sqm.
The proposal also seeks to introduce a covered external ‘link’ canopy to the rear between the
garage / gym and the new extension, this has a footprint of 25sqm. The proposals also seek to
remove the timber garden sheds. In summary the resultant total built element on the site would
be approximately 346sqm in lieu of the 264sqm at present (an increase of 82sqm). This would
represent less than 20% of the site being built up which is well under the 33% threshold
Page 56

Page 57

considered to be overdevelopment. It is also noted that the footprint of the proposed first floor
of the extension extends to approximately 50sqm.   
2.4 NPF4 Policy 16 requires that development proposals will be supported where they ‘do not have
a detrimental impact on the character or environmental quality of the home and the surrounding
area in terms of size, design and materials’. 
2.5 NPF4 Policy 14 requires that development proposals be designed to improve the quality of an
area; and, offers support to development that achieve the six qualities of Health; Pleasant;
Connected; Distinctive; Sustainable; and, Adaptable. Development that is poorly designed,
detrimental to the amenities of surrounding areas or inconsistent with the aforementioned six
qualities will not be supported. 
2.6 NPF Policy 14 is closely aligned with the provisions of Policy LDP 9 and SG LDP Sustainable
Siting and Design Principles which requires that new development be assessed against
identified sustainability criteria and identified design. The Supplementary Guidance also
establishes design criteria that seeks to protect the residential amenities and daylight enjoyed
by the occupiers of neighbouring properties. 
2.7 The design of the proposed extensions and garage are contemporary in design and are
considered to be subservient to the donor house and do not dominate it, the clear delineation
between the old and the new is welcomed as is in line with policy, the proposed materials are
high quality and respect the character of the existing property and wider conservation area. 
2.8 Having regard to the built development pattern and densities of the local area, it is noted that
there is a range of scale and design of houses, and whilst the overall pattern of built
development is very spacious, there is a range of site densities; and that the ratio of built
development to open curtilage in the case of this proposal is similar to some other existing
development. The scale of the proposed extensions being an increase of 82sqm to the overall
built element on the site is comparatively small and it is considered that the siting, form,
massing and material finishes will respect and enhance the existing character of built
development and compliment the visual character of the area in accordance with the relevant
provisions of NPF4; LDP 9 and SG on Sustainable Siting and Design Principles. 
2.9 The proposed extension and garage will be screened from surrounding properties at ground
floor level by existing natural boundary features and this screening, in conjunction with the
relative orientation of windows and separation distances will mean that there will be no material
loss of residential amenities to the occupiers of surrounding properties by reason of
overlooking. In terms of the first floor element the window on the north elevation of the
proposed extension is in excess of the minimum 18 metres guideline (SG – Sustainable) from
windows on the front elevation of the property to the rear, it is also noted that the proposed
window is to a non-habitable room and that furthermore, a condition has been recommended
that this window be obscure glass and maintained in perpetuity in obscure glass to protect the
privacy and amenity of adjacent property. It is also noted that there was concern that the
perforated steel cladding to the first floor of the West elevation of the proposed extension could
impact on the privacy and amenity of the neighbouring property, it is noted that a safeguarding
condition has been recommended that requires samples of this material be approved by the
authority and that further a condition has been recommended that requires the glazing behind
this screening be of obscure glass to protect the privacy and amenity of adjacent property.
Lastly, the proposed windows to the south elevation of the first floor extension and the
proposed terrace at this location; these will be screened by the exiting large copper beach tree
which is sited within the neighbouring garden (this tree subject to separate TPO consideration),
furthermore, there is an existing level of overlook from the existing first floor windows in this
location, therefore, the limited additional element of overlooking is considered to be within
acceptable limits. On this basis, Officers area satisfied that the proposed development will not
have a material impact upon the residential amenities of nearby properties in accordance with
the provisions of NPF4 Policy 14 and Policy LDP 9/SG – Sustainable Siting and Design
Principles. 
Page 57

Page 58

C. Natural Environment 
3.1 NPF4 Policy 3 generally seeks to protect biodiversity, reverse biodiversity loss and to deliver
positive benefits from development that strengthens nature networks. Policy 3(c) requires that
proposals for local development will include appropriate biodiversity measures proportionate to
the scale and nature of the proposal. Policy 3(d) requires any potential adverse impacts on
biodiversity/nature networks/natural environment to be minimised by planning and design. NPF
4 Policy 3 is generally aligned with LDP Policy, although NPF 4 Policy 3(c) goes beyond the
LDP requirements in relation to current biodiversity interests of the site. 
3.2 NPF 4 Policy 4 generally confirms that development that will have an unacceptable impact on
the natural environment will not be supported. Outside of European, national and local
designations, development is expected to meet the relevant statutory tests in terms of
protected species legislation; and potential impacts must be fully considered prior to
determination of planning applications. NPF 4 Policy 4 (insofar as it relates to the location,
nature and scale of the current proposal) largely aligns with the provisions of LDP policy. 
3.3 Policy LDP 3 (the Argyll and Bute Local Development Plan – 2015) generally serves to support
the protection, conservation and enhancement of the environment.  SG LDP ENV 1 ensures
that other legislation relating to biodiversity habitats are fully considered in relation to
development proposals; and generally that development does not have an adverse impact on
habitat or species, particularly in relation to habitat or species designated as being of
European, national or local significance. 
3.4 The site is not located within or in proximity to any nature conservation designation with the
majority of the proposals being built on previously developed land where the existing garage
and single storey element are to be removed. 
3.5 It is advised that submission, assessment and approval of a scheme of hard and soft
landscaping be required by planning condition which the council’s Local Biodiversity Officer will
have opportunity to assess. It is further recommended that this condition requires that any hard
landscaping proposed be of permeable materials as to not impact on the surface water
drainage for the site. 
D. Built Environment 
4.1 The site is located within the Helensburgh Hill House Conservation Area. 
4.2 The existing property is not listed though it is a traditional detached villa. 
4.3 The exiting property is sited directly adjacent to a category B listed property. Located on the
opposite side of the street from the site to the South is A listed Brantwoode and adjacent to this
is B listed Strathmoyne. Furthermore, located on the street behind the site to the North is A
listed Red Towers and adjacent to this is B listed Tordarroch. For this reason Historic
Environment Scotland have been consulted on the proposals due to the possible effects on
setting of surrounding listed properties and they have noted; ‘The Hill House is several streets
away, with no intervisibility with 4 West Lennox Drive, and is not likely to experience any
impacts on its setting. As well as Red Towers, we have also considered potential impacts on
nearby Category A-listed Brantwoode on Munro Drive West. We have considered how the
surroundings of Red Towers and Brantwoode contribute to an understanding, appreciation, and
experience of their cultural significance and do not think the proposed extensions at 4 West
Lennox Drive would have a significant adverse impact on their settings.’ 
4.4 NPF4 Policy 7 generally seeks to protect and enhance the historic environment, assets and
places, and to enable positive change as a catalyst for the regeneration of places. Policy 7(a)
requires that development proposals with a potentially significant impact on historic assets or
places be accompanied by an assessment based on an understanding of the cultural
significance of the asset and/or place. Development will only be supported where the character
and appearance of the conservation area is preserved or enhanced; and where the existing
Page 58

Page 59

natural and built features which contribute to the character of the conservation area (including
boundary walls, trees and hedges) are retained. 
4.5 The provisions of NPF 4 Policy 7 (as it applies to the current proposal) are LDP 3 and SG LDP
ENV 16(a) and SG LDP ENV 17, however NPF 4 Policy 7(a) imposes an additional
requirement for a detailed assessment as summarised above which was requested by the
councils design and conservation officer within their original consultation response. The
applicants have taken this on board and have submitted a revised design and access
statement as well as the submission of a visual impact assessment which is considered
acceptable under the requirements of the above. 
4.6 Officers are satisfied that the proposed development, by reason of siting, scale, form and
design is of a sufficiently high standard and will preserve and enhance the character and
appearance of this part of the Hill House Conservation Area in accordance with NPF 4 Policy 7,
Policy LDP 3, SG LDP 16(a), and relevant HES guidance on development impact on historic
assets. 
F. Impact on Woodland 
5.1 As the site is located within a conservation area any works to the existing trees within the site
would require tree works consent. Within the site there are approximately 12 trees that bound
the eastern boundary, a single large tree at the southern boundary and 3 trees along the
western boundary, no works or removals have been proposed to any trees within the site.
However given the close proximity of the extension to the boundary trees and neighbouring
trees (including the copper beech at 2 Upper Colquhoun St) and the works to install new drains
then the tree roots may be affected. 
5.2 It is advised that during construction work on site, including the laying of services, that no
excavation shall be undertaken below the canopy of any tree to be retained including the
copper beach tree located within the neighbouring garden of 2 Upper Colquhoun Street,
Helensburgh who’s roots and canopy are partially within the application site by way of a
planning condition. 
5.3 Furthermore, it is also advised that all existing trees on site shall be protected at all times
during the construction period by means of the erection of a 1.2 metre high fence in
accordance with Clause 8.2.2 of BS 5837 "Trees in Relation to Construction" at least one
metre beyond the canopy of each tree including the copper beach tree located within the
neighbouring garden of 2 Upper Colquhoun Street, Helensburgh who’s roots and canopy are
partially within the application site by way of a further planning condition. 
5.4 It should be noted that the aforementioned copper beach tree which is sited within the
neighbouring properties garden at; 2 Upper Colquhoun Street form part of a separate TPO
application which the council is recommending as this particular tree is a key landscape feature
which is to be protected and is important to the appearance and character of the surrounding
conservation area. 
5.5 On the above basis it is considered that the proposal is in accordance with the provisions of
NPF4 Policy 6; Policy LDP 3; and SG LDP ENV 6. 
K. Infrastructure 
6.1 The application forms state that the site is not within an area of known risk of flooding; and
advises that the applicant does not think that the proposal will increase flood risk elsewhere.
The application site, is not overlain by any recorded areas at risk to coastal, fluvial or surface
water flooding with reference to the SEPA Flood Map. 
Page 59

Page 60

6.2 During the determination process the applicant has submitted plans to show a re-routed and
repaired surface water drainage scheme for the site. It is noted that consent is not required for
the repair of existing drainage but is required if there are proposed alterations to the existing
drainage. As such the applicant has submitted drawing to show the surface water drainage
alterations. I have been to site and viewed the issues with the current broken surface water
drainage and I am content that the proposed alterations to reinstate and alter this are sufficient.
As this is a proposed extension and not a new build there is no requirement for the applicants
to install a new SUDS system. The submitted drawings show a new french drain running along
the northern boundary of the rear site to pick up the broken field drains which where
discharging water into the solum of the property and then route the new field drain to the front
of the property to tie in with the existing drainage discharge. 
6.3 Subject to the above, it is considered that the proposal makes adequate provision for services
infrastructure in accordance with the provisions of NPF4 Policy 22, SG LDP SERV 2 and LDP2
Policy 61. 
Page 60

Page 61

Reproduced from the Ordnance Survey map with the permission of the Controller of Her Majesty's Stationery Office (C) Crown Copyright 2005
Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or Civil Proceedings.
OS License No. XYZ123ABC
Location Plan Relative to Planning Application:23/00652/PP
O
1:1,250
0 10 205 Meters
Application Site
Page 61

Page 62

This page is intentionally left blank

Page 63

ARGYLL AND BUTE COUNCIL             PPSL Committee
DEVELOPMENT AND ECONOMIC GROWTH                    18th October 2023 
LOCAL DEVELOPMENT PLAN 2 TECHNICAL NOTES 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to invite Members of the PPSL Committee to approve
technical notes as planning guidance to Argyll and Bute Local Development Plan
2 (LDP2). 
1.2 On 28th September 2023 Council agreed to the submission LDP2 as modified by
the reporters to the Scottish Ministers stating intent to adopt. The Plan will be
adopted within 28 days of submission unless otherwise directed by the Scottish
Ministers. 
1.3 Once adopted, 2015 LDP and its Supplementary Guidance will no longer be
part of the Development Plan.  LDP2 will require supporting guidance to assist
applicants and decision makers in the interpretation of policy.  However, formal
Supplementary Guidance has now been abolished by the changes to the
planning system, with a few exceptions to this noted under transitional
provisions.  As such a range of Technical Notes will be produced to provide
further guidance and the LDP2 document notes this.  When approved these
Technical Notes will be a material consideration when assessing planning
applications.   
1.4  Three technical notes are being presented with this report, namely TN06
Sustainability Technical Note and Checklist (see Appendix 1); TN21 Visual
Impact Illustration and Landscape and Visual Assessment (Light) Technical
Note (Appendix 2) as well as supporting documents (Appendices 3, 4 and 5);
and TN07 Sustainable Buildings Technical Note and Checklist (Appendix 6) 
Page 63 Agenda Item 7

Page 64

RECOMMENDATION 
1.4 It is recommended that Members note and approve the content of the following
proposed technical notes and supporting documents as non-statutory guidance
which will be a material consideration to support LDP2. 
 TN06 Sustainability Technical Note and Checklist (Appendix 1)
 TN21 VII and LVIA (Light) Technical Note (Appendix 2)
 TN21 Appendix 1 Sample Visualisations for VII and LVIA (Light) (Appendix 3)
 TN21 Appendix 2 VII Template (Appendix 4)
 TN21 Appendix 3 LVIA (Light) Template (Appendix 5)
 TN07 Sustainable Buildings Technical Note and Checklist (Appendix 6) 
Page 64

Page 65

ARGYLL AND BUTE COUNCIL             PPSL Committee
DEVELOPMENT AND ECONOMIC GROWTH                    18th October 2023 
LOCAL DEVELOPMENT PLAN 2 TECHNICAL NOTES 
2.0 INTRODUCTION 
2.1 The purpose of this report is to invite Members of the PPSL Committee to approve
technical notes as planning guidance to Argyll and Bute Local Development Plan
2 (LDP2). 
3.0 RECOMMENDATION 
3.1 It is recommended that Members note and approve the content of the following
proposed technical notes and supporting documents as non-statutory guidance
to support LDP2.
 TN06 Sustainability Technical Note and Checklist (Appendix 1)
 TN21 VII and LVIA (Light) Technical Note (Appendix 2)
 TN21 Appendix 1 Sample Visualisations for VII and LVIA (Light) (Appendix 3)
 TN21 Appendix 2 VII Template (Appendix 4)
 TN21 Appendix 3 LVIA (Light) Template (Appendix 5)
 TN07 Sustainable Buildings Technical Note and Checklist (Appendix 6) 
4.0 DETAIL 
4.1 LDP2 aims to provide a flexible policy framework to support sustainable growth
across Argyll and Bute. Outwith settlement areas, there are two key differences
between the 2015 LDP DM1 and LDP2 Policy 2, namely: 
 there are no longer Rural Opportunity Areas where appropriate small
scale development was supported; and
 there is no longer the Area Capacity Evaluation (ACE) process which has
Page 65

Page 66

been previously carried out by the Planning Authority. 
Instead, LDP2 Policy 2 (Outwith Settlement Areas) allows a more flexible
approach to where in the Countryside Area development may be allowed,
however development proposals will be required to demonstrate that there will
be no unacceptable adverse effects (either individually, or cumulatively) on
natural heritage resources, built and/or cultural heritage resources, and
landscape and visual amenity. Where there is preliminary evidence that there
may be such adverse effects (and where a formal Environmental Impact
Assessment (EIA) is not required) a landscape and visual impact assessment,
natural heritage assessment, or built and/or cultural heritage assessment may
be required. 
4.2 Policy 70 (Development Impact on National Scenic Areas (NSAs)) and Policy
71 (Development Impact on Local Landscape Areas (LLAs)) require proposals
within these designations to be supported by a Landscape and Visual Impact
Assessment (LVIA). 
4.3  LVIA is a tool used to identify and evaluate the potential effects of change
resulting from proposed development on the character of the landscape as well
as on people’s views and visual amenity. The emphasis is on the identification
of, and degree of, this effect. 
4.4  The Landscape Institute set out guidance for LVIA which is used within the EIA
process. However, the Planning Authority recognises the need for a
proportionate approach for smaller scale development or on sites that are
considered to be less sensitive. Therefore, three levels of this process have
been defined – basic Visual Impact Illustrations (VII); LVIA (Light); and full LVIA
as required for EIA. 
4.5  It is proposed that the need for VII or LVIA will be determined through the
submission of a Sustainability Checklist (TN06 – see Appendix 1) which is
required for all applications for development, and it is recommended that this
be completed at Pre-Application stage and updated as required should a
planning application be made. 
4.6  TN06 Sustainability (Appendix 1) provides guidance on the wider
considerations of siting a development in the natural or built landscape as well
as the impact of a development on the community, economy and environment.
The guidance and checklist are intended to guide developers to meet the
requirements of policies 04 (Sustainable Development), 05 (Design and
Placemaking) and 08 (Sustainable Siting) as well as to consider whether a VII
or LVIA (Light or Full) may be required through Policies 02, 70 and 71. This
replaces an existing Sustainability Checklist within the 2015 LDP with one
requiring more detail, given the increased emphasis on climate change in
Page 66

Page 67

NPF4. 
4.7  TN21 (VII and LVIA (Light) (see Appendix 2) provides detail on the
proportionate approach that the Planning Authority would expect for
developments within the Countryside Area, National Scenic Area or Local
Landscape Area. It is supported by appendices by way of Sample Visualisations
and Templates (see Appendices 3, 4 and 5). 
4.8  TN07 – Sustainable Buildings Technical Note and Checklist (Appendix 6) goes
into more detail on the proposed building itself. It is proposed to be mandatory
that this is completed for all applications for development. The content of this
technical note and checklist provides additional detail to policy 09 (Sustainable
Design). 
5.0 CONCLUSION 
5.1 Technical notes are non-statutory but are a material consideration when
assessing planning applications. They provide detail to policies within the LDP2.
The three technical notes presented with this report will assist with consistency
of decision making when applying policies 02, 70, 71, 04, 05, 08 and 09. On
this basis Members are recommended to approve the following technical notes
and supporting information:
 TN06 Sustainability Technical Note and Checklist (Appendix 1)
 TN21 VII and LVIA (Light) Technical Note (Appendix 2)
 TN21 Appendix 1 Sample Visualisations for VII and LVIA (Light) (Appendix 3)
 TN21 Appendix 2 VII Template (Appendix 4)
 TN21 Appendix 3 LVIA (Light) Template (Appendix 5)
 TN07 Sustainable Buildings Technical Note and Checklist (Appendix 6) 
6.0 IMPLICATIONS 
6.1 Policy: Once adopted, Local Development Plan 2 will be part of the
Development Plan for Argyll and Bute (excluding Loch Lomond and the
Trossachs National Park) alongside National Planning Framework 4. The
planning authority, in the determination of planning applications, shall have
regard to the provisions of the Development Plan, so far as material to the
application, and to any other material considerations. Technical Notes are non-
statutory material considerations when assessing planning applications which
provide further detail to the policies in the Plan. 
6.2 Financial: None
Page 67

Page 68

6.3  Legal : Once adopted the planning authority is required to have regard to the
provisions of the local development plan as part of the Development Plan for
the area, so far as material to the application, and to any other material
considerations, in the determination of planning applications. 
6.4  HR: None 
6.5  Fairer Scotland Duty: None
6.5.1   Equalities - protected characteristics: None
6.5.2   Socio-economic Duty: None
6.5.3 Islands: None 
6.6 Climate Change: TN06 and TN07 will provide guidance to encourage, promote
and facilitate development that adapts to current and future impacts of climate
change. 
6.7  Risk: Failure to approve Technical Notes as a non-statutory material
consideration could result in lack of clarity in interpreting statutory planning
policy. 
6.8  Customer Service: None 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan
Policy Lead: Kieron Green
18th October 2023                                                  
For further information contact: 
Kim de Buiteléir – Design and Conservation Officer
Fergus Murray – Head of Economic Development and Strategic Transport,
Development and Infrastructure Services
Page 68

Page 69

APPENDICES
Appendix 1: TN06 Sustainability Technical Note and Checklist
Appendix 2: TN21 VII and LVIA (Light) Technical Note
Appendix 3: TN21 Appendix 1 Sample Visualisations for VII and LVIA (Light) 
Appendix 4: TN21 Appendix 2 VII Template
Appendix 5: TN21 Appendix 3 LVIA (Light) Template
Appendix 6: TN07 Sustainable Buildings Technical Note and Checklist 
Page 69

Page 70

This page is intentionally left blank

Page 71

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
.
Argyll and Bute Local
Development Plan 2
TN06
SUSTAINABILITY
Appendix 1
Page 71

Page 72

TN06 SUSTAINABILITY 
Sustainable Development can be defined as being “development that meets the needs of the
present without compromising the ability of future generations to meet their own needs” (The
Brundtland Definition, as sourced in Appendix F of NPF4). 
This technical note provides additional detail to policies 04 - Sustainable Development, 05 - Design
and Placemaking and 08 - Sustainable Siting of the adopted Argyll and Bute Local Development Plan
2 (LDP2), and NPF4 policies 14 -  Design, Quality and Place, 15 – Local Living and 20 Minute
Neighbourhoods  and 29 Rural Development. This technical note provides guidance on the wider
considerations of siting a development in the natural or built landscape as well as the impact of a
development on the community, economy and environment. 
Following this technical note is a Sustainability Checklist. It is mandatory that potential developers
complete this for all applications for development, and it is recommended that this be completed
at Pre-Application stage and updated as required should a planning application be made. In some
cases a Visual Impact Illustration (VII) or Landscape and Visual Impact Assessment (LVIA) may be
required under LDP2 policies 02, 70 and 71 as a separate, but inter-related, assessment. To allow a
proportionate approach this will not always be a full LVIA as set out by the Landscape Institute, but
in appropriate cases will be a “light” version. This requirement will be decided by the Planning
Authority on the basis of the information provided within the Sustainability Checklist and other
relevant considerations. 
Related Issues
Technical Note TN07 - Sustainable Buildings should be read in conjunction with TN06, which
provides guidance on the sustainable design of the building itself. 
Aesthetic design considerations will follow and compliment sustainable building considerations, and
this is covered in Policy 10 Design- All Development and the council’s Design Guidance (which is
intended to be consolidated and updated during the Plan period). 
1.0 SITE APPRAISAL 
The initial step to be undertaken by anyone proposing a new development, is a comprehensive site
appraisal which will help identify the limitations and opportunities of the site at an early stage. This
is the starting point of any design process. Some surveys may be required to be carried out by
specialists. 
Page 72

Page 73

1.1  SUITABILITY OF THE SITE – COMMUNITY, ECONOMY AND ENVIRONMENT (LIVEABLE,
PRODUCTIVE & SUSTAINABLE PLACES)
 Development should maximise the opportunity for local community benefit
 Development should maximise the use of existing infrastructure and services and
minimise the need for people to travel for essential services. Where travel is required
active travel routes or public transport should be available.
 Most of the agricultural land in Argyll and Bute is of low quality, however agriculture
remains an important part of Argyll and Bute’s economy and provides continuous land
management. Therefore countryside development should not result in the loss of better
quality agricultural land or result in the fragmentation of field systems or the loss of
access to better quality agricultural land.
 Development will not be supported on land that is subject to flooding or land erosion
 Landscape designations of the site itself or area around this must be considered and
policies within the High Quality Environment section of the LDP2 taken into account
 Historic Built Environment designations – where applicable reference should be made
to the Historic Built Environment policies within the LDP2 as well as Conservation Area
Appraisals
 Habitats and/or protected species - The biodiversity within and adjacent to
development sites should be maintained and improved where possible – further detail
can be found in LDP2 policy 73 Development Impact on Habitats, Species and
Biodiversity) and the associated Biodiversity Checklist Technical Note TN04) 
1.2  CHARACTER OF THE SITE AND WIDER AREA 
1.2.1 NATURAL RESOURCES
 Microclimate, prevailing winds, daylight/sunlight
 Topography
 Trees and planting
 Key views in, from and across the site
 Boundary treatments 
1.2.3.  MANMADE RESOURCES
 Layout and density of the built context and building lines – development should
integrate within this existing built form in terms of urban grain and density and also
ridge height, scale and massing.
 Key views in, from and across the site
 Boundary treatments
 Access and existing infrastructure 
Page 73

Page 74

2.0 SUSTAINABLE SITING 
2.0.1 LANDSCAPE CHARACTER 
Landscape is about the relationship between people and place. The term does not mean just special
or designated landscape and does not only apply to the countryside. It results from the way that
different components of our environment – both natural and cultural– interact together and are
perceived 
Examples of key characteristics within a landscape character area might be:
 landform, drainage and water bodies; vegetation and tree cover; human activity such as land
management and use, settlements and buildings;
 The context or setting of the urban area and its relationship to the wider landscape;
 The layout, scale and density of buildings
 Settings of listed buildings (see HES guidance)
 Access and connectivity, including streets and footways/pavements;
 water bodies, water courses and other water features;
 The nature and location of vegetation, including the different types of green space and tree
cover and their relationships to buildings and streets;
 Coastal features;
 Views to and from the sea; 
The Sustainability Checklist which follows this Technical Note, requires basic information to
determine the landscape character. Should the Planning Authority determine that there is
preliminary evidence that there may be adverse effects on landscape and visual amenity (in
Countryside Areas) or the site is located in a National Scenic Area (NSA) or Local Landscape Area
(LLA) then a VII or LVIA (light or full) will be required. 
2.0.2  INTEGRATION INTO THE NATURAL LANDSCAPE – this will minimise the detrimental impact
on the landscape and minimise environmental disturbance 
 The development should be positioned within the landscape to make the best use of solar
gain, natural ventilation and shelter from the elements. 
 Hilltop, skyline or ridge locations should be avoided not only for visual reasons but to avoid
exposure to high winds. The siting must respect existing landforms and key views. Only in
some exceptional cases will there be a case for landmark development, which would require
a high quality design and would still be based on robust site analysis and understanding. 
 Existing trees and hedgerows on the site should be retained where possible 
 Large un-fenestrated under-buildings generally are detrimental to buildings and look
inappropriate in most settings. They also generally increase construction costs while not
providing useable accommodation on sloping sites. On sloping sites, careful positioning
Page 74

Page 75

combined with minor excavation works often provides a cheaper and more attractive design
solution than under-building and can also give a house added shelter from prevailing winds.
If a 1 ½ or 2 storey house is required, on a sloping site a split level solution could be
designed, which will minimise both visual and physical impact. 
 The extent of any under-building or excavations should be clearly shown on submitted plans
including the use of cross sections. Any waste material from excavations should be re-
graded, landscaped and utilised to backfill against areas of under-build that would otherwise
remain exposed or alternatively be removed from the site, restoring the site to its natural
condition. 
2.0.3  INTEGRATION INTO THE BUILT LANDSCAPE – in order to respect existing development
patterns and the amenity of other dwellings. 
 The layout of new development must reflect the local character and building patterns and
be compatible with neighbouring uses. 
 New development must be sympathetic to traditional building forms as well as landmarks,
historical features and key views. 
 New development must be compatible with, and consolidate, the existing settlement. The
relationship with neighbouring properties is paramount, as issues such as loss of daylight
and  overlooking could arise: 
o Householders can legitimately expect a reasonable amount of direct daylight into all
or at least some living room windows, and this should be protected as far as possible
in order to maintain reasonable levels of household amenity. 
o When considering a site for a new house, or an extension to an existing house,
applicants should ensure that the house will not significantly affect daylight and
direct sunlight to existing neighbouring properties. Applicants should refer to
published standards “Site Layout Planning for Sunlight and Daylight” BRE 1991
(check date) 
o No main window of a habitable room (i.e. all rooms except bathrooms and hallways)
within a dwelling shall overlook (directly face) the main windows of habitable rooms
in neighbouring dwellings at a distance of less than 18 metres*. Plans submitted
with planning applications will be required to show the location of all adjoining
properties and the exact position of their main windows. A distance of 12 metres is
required between habitable room windows and gable ends or elevations with only
non-habitable room windows. These standards may be relaxed where the angle of
view or the design (i.e. use of frosted glass) of the windows allows privacy to be
maintained. 
Page 75

Page 76

o The use of windows that are taller than they are wide can greatly reduce problems
of overlooking in built up areas. 
 Existing infrastructure should be utilised where possible such as access roads and tracks as
well as services. The remaining capacity of infrastructure such as private water supplies must
be taken into account. 
*this may not be possible in densely built areas or “courtyard-type” schemes 
3.0  PRESENTATION OF THE APPRAISAL AND THE DESIGN SOLUTION 
A Sustainability checklist has been prepared as an Appendix to this Technical Note which must be
completed and submitted with all applications. It is recommended that this be completed at Pre-
Application stage and updated as required should a planning application be made. Should the
Planning Authority determine that a VII or LVIA (light or full) is required then this should form a
separate but inter-related assessment. 
Separately, a Sustainable Buildings Checklist (TN07) covering the design of the building itself must be
completed. 
Additionally, the Scottish Government Planning Advice Note 68 Design Statements provides detailed
advice on the presentation of the information gathered, considered and developed. Whilst Design
Statements are only a requirement with certain categories of planning applications, it is advisable to
include one with every application for new development as good practice. A Design Statement may
either be integrated with the VII or LVIA (light) (where required) or submitted as an accompanying
document. Due to the nature of a full LVIA in those limited cases they would require to be kept as
separate documents.  
Page 76

Page 77

TN06: SUSTAINABILITY CHECKLIST 
It is mandatory that potential developers complete this checklist for all applications for
development. It is recommended that this be completed at Pre-Application stage and updated as
required should a planning application be made.   
It is intended that by completing the checklist the applicant could take the opportunity to review the
sustainability of their project and make changes to their application, where appropriate and to
ensure compliance with LDP policies. Not every criterion will be relevant for every development, for
example extensions, in which case “not applicable” should be noted in the details column.   
Where applicable, additional supporting information should be appended to this document and the
relevant appendix number should be noted in the details column. 
COMMUNITY – LIVEABLE PLACES  Give details
Demonstrate how the project contribute
to the viability, sustainability and
diversity of the community, including but
not limited to the creation or
diversification of businesses; essential
community services; digital infrastructure
skills training or education; healthcare or
social support; play and recreation
facilities; a district (renewable) heat
network. 
Demonstrate how the project support
new ways of working such as home
working, remote working or community
hubs. 
Demonstrate how the proposal minimise
the need for people to travel to access
employment, food, education, recreation
and other essential services. 
Provide details of any existing public
transport or active travel routes.
Demonstrate how the proposal
incorporates new active travel proposals. 
Page 77

Page 78

Does the proposal involve the
resettlement of previously inhabited
areas? 
Any other comments 
ECONOMY – PRODUCTIVE PLACES  Give details
Demonstrate how this is considered an
appropriate location for regeneration and
growth. (refer to national and local
spatial strategies and policies) 
Provide details of how the project has
any effect (positive or negative) on any
existing organisations. 
Demonstrate how the proposal
maximises the use of existing
infrastructure capacity or contributes
towards new essential infrastructure. 
Would the proposal result in the loss of
agricultural land, or the fragmentation of
farm units? If so, provide details. 
Any other comments 
ENVIRONMENT – SUSTAINABLE PLACES
Additionally, a Biodiversity Checklist
must be completed as required by Policy
73 and TN04, and/or a Flood Risk
Assessment must be completed as
required by SEPA or the Planning
Authority
Give details
Is the site brownfield? If so, what is the
extent of naturalisation on the site? 
Page 78

Page 79

Or does the proposal re-use a redundant
or unused building? If so, provide details. 
What measures are proposed to improve
or restore the natural environment? 
Would the proposal involve the loss of
trees and/or woodland? If so, provide
details. 
And would the proposal involve the loss
of a protected open space? If so, provide
details. 
Would the proposal disturb carbon rich
soils such as peat? If so, provide details. 
Would the proposal result in the loss of
an existing waste site? If so, provide
details. 
Provide details of any specific measures
in place to protect existing landscape and
vegetation from damage or degradation
during construction. 
Provide details of any specific measures
in place to protect the water
environment during construction? 
Any other comments 
LANDSCAPE CHARACTER  Give Details 
Is the proposed site in a settlement area
or countryside area? 
Is the proposed site within a National
Scenic Area (NSA) or Local Landscape
Area (LLA)? 
Page 79

Page 80

Describe the landscape character,
referring to section 2.0.1 for examples of
key characteristics that may need to be
considered. 
Please identify any relevant landscape
studies, conservation area appraisals etc
that you have taken into consideration. 
Where appropriate, it is recommended
that maps highlighting designations and
sensitive non-designated receptors, as
well as related photos, are appended to
this document. Please note relevant
appendix numbers within the details
section. 
List any unimplemented but live planning
consents in the vicinity of the site which
will be considered in terms of cumulative
effects. 
INTEGRATION OF THE BUILDING INTO
THE NATURAL OR BUILT LANDSCAPE
It is recommended that this section is
detailed more fully within a Design
Statement 
Give Details 
Describe the number of units (plus
ancillary buildings) proposed along
with the proposed floor areas, heights
(to ridge) and materials 
Outline how the building has been
designed on the site to make the best
use of solar gain, natural ventilation
and shelter from the elements 
Does the development avoid land
engineering works such as cut and fill? 
How has the building been designed
to integrate into the topography? 
Are any trees or hedgerows to be
removed to allow for the 
Page 80

Page 81

development and if so is there any
compensatory tree planting
proposed? 
How has the character, form and
design of any surrounding buildings
been taken into account in the design
and siting of the building? 
How has existing infrastructure been
utilised? 
Should the Planning Authority determine that there is preliminary evidence that there may be
adverse effects on landscape and visual amenity (in Countryside Areas) or the site is located in a
National Scenic Area (NSA) or Local Landscape Area (LLA) then a VII or LVIA (light or full) will be
required. 
TO BE COMPLETED BY THE PLANNING
AUTHORITY 
On the basis of the information provided
in the Sustainability Checklist is further
landscape and/or visual information
required? 
Nothing further      ☐
VII                          ☐
LVIA (light)            ☐
LVIA (full)              ☐
Reason for decision     
Page 81

Page 82

This page is intentionally left blank

Page 83

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
.
Argyll and Bute Local
Development Plan 2
TN21 VII AND LVIA
(LIGHT)
Appendix 2
Page 83

Page 84

TN21 Visual Impact Illustration (VII) and Simplified Landscape
Visual Impact Assessments (LVIA Light) – Technical Note 
CONTENTS 
1.0 BACKGROUND INFORMATION p1
1.1 THE POLICY CONTEXT THAT REQUIRES VII OR LVIA
1.2 WHEN IS VII OR LVIA REQUIRED?
1.3 THE SCOPE OF THIS TECHNICAL NOTE
1.4 WHO IS THIS GUIDANCE FOR?
1.5 UNDERSTANDING LANDSCAPE
1.6 UNDERSTANDING “VISUAL AMENITY”
1.7 CUMULATIVE EFFECTS
1.8 VISUALISATIONS FOR VII / LVIA (LIGHT)
1.8.1 OVERVIEW
1.8.2 TYPES OF VISUALISATIONS
1.8.3 TECHNICAL NOTES
2.0 VII PROCESS p7
2.1 SETTING OUT THE VII DOCUMENT
2.1.1 INTRODUCTION
2.1.2 VISUAL BASELINES
2.1.3 THE PROJECT
2.1.4 MITIGATION / ENHANCEMENT
3.0 LVIA (LIGHT) PROCESS DIAGRAM p9
3.1 SETTING OUT THE LVIA (LIGHT) DOCUMENT
3.1.1 INTRODUCTION
3.1.2 LANDSCAPE AND VISUAL BASELINES
3.1.3 THE PROJECT
3.1.4 MITIGATION / ENHANCEMENT
4.0 FURTHER READING p12
5.0 APPENDICES          p12 
Page 84

Page 85

1  
1.0 BACKGROUND INFORMATION 
1.1 THE POLICY CONEXT THAT REQUIRES VII or LVIA 
Sustainable development requires finding an appropriate balance between economic, social and
environmental matters, and so protecting and enhancing the natural, built and historic environment
is an important part of this. The LDP2 seeks to promote a flexible approach to small scale
development in the Countryside, including National Scenic Areas (NSA’s) and Local Landscape Areas
(LLA’s) through Policies 02, 70 and 71 which clarify when the planning authority may require
submission of an LVIA. 
LVIA is a tool used to identify and evaluate the potential effects of change resulting from proposed
development on the character of the landscape as well as on people’s views and visual amenity. The
emphasis is on the identification of, and degree of, this effect. 
Given the need to take a proportionate approach depending on the site characteristics and degree
of sensitivities, the need for a VII or LVIA is determined through the submission of a Sustainability
Checklist (see Technical Note TN06) which is required for all applications for development, and it is
recommended that this be completed at Pre-Application stage and updated as required should a
planning application be made. 
From the information provided in the Sustainability Checklist, and taking into account the
requirements of Policies 02, 70 and 71 of LDP2, the planning authority will conclude one of the
following options:
 No further information required in terms of landscape or visual impacts
 Visual Impact Illustrations (VII) are required
 A simplified version of a Landscape and Character Impact Assessment (LVIA Light) is required
 A full Landscape and Character Impact Assessment (LVIA) is required as per the Landscape
Institute’s guidelines.
Please refer to section 1.2 for further guidance on when each option may be required. 
Page 85

Page 86

2  
1.2 WHEN IS A VII OR LVIA REQUIRED? 
The level of further assessment (if any) that is required will be determined by the Planning
Authority through the information provided in the Sustainability Checklist. The below is intended as
a basic guide but is not definitive. 
1. NO FURTHER INFORMATION REQUIRED IN TERMS OF LANDSCAPE OR VISUAL IMPACTS
 In a settlement area where there is no preliminary evidence that the scale or siting would
raise concerns in terms of either the landscape character or visual amenity
 In a countryside area however there is no preliminary evidence that the scale or siting
would raise concerns in terms of either the landscape character or visual amenity 
2. VISUAL IMPACT ILLUSTRATIONS (VII)
 In a countryside area and the landscape character has been sufficiently addressed through
the Sustainability Checklist and appended information, raising no concerns in terms of
landscape character. However visualisations are required due to one or more of the
following:
o The scale of the development
o The development’s perceived prominence within a landscape
o Sensitivity of receptors to the development (e.g. historic assets)
o Siting impacting upon a gateway location in the landscape (i.e. where the
landscape transitions from one character to another)
 In a LLA where there is no preliminary evidence that the scale or siting would raise
concerns in terms of the landscape character. However visualisations are required due to
the moderate sensitivity of the landscape designation
This simplified process should not require to be carried out by a Landscape Architect. 
3. SIMPLIFIED LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA LIGHT)
 In a LLA due to one or more of the following:
o The scale of the development
o The development’s perceived prominence within a landscape
o Sensitivity of receptors to the development (e.g. historic assets)
o Siting impacting upon a gateway location in the landscape (i.e. where the
landscape transitions from one character to another)
 In an NSA where there is no preliminary evidence that the scale or siting would raise
significant concerns. However due to the high sensitivity of the landscape designation an
LVIA (Light) is required.
This simplified process should not require to be carried out by a Landscape Architect. 
4. FULL LANDSCAPE AND VISUAL IMPACT ASSESSMENT (FULL LVIA)
 EIA development
 In an NSA due to one or more of the following:
o The scale of the development
o The development’s perceived prominence within a landscape
o Sensitivity of receptors to the development (e.g. historic assets)
o Siting impacting upon a gateway location in the landscape (i.e. where the
landscape transitions from one character to another)
This is defined by the Landscape Institute and forms part of the Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017. It is expected that a Landscape
Architect would be required to carry out this assessment. Refer to GLVIA.
Page 86

Page 87

3  
1.3 THE SCOPE OF THIS TECHNICAL NOTE 
This technical note sets out the simplified process required by Argyll and Bute Council for VII and
LVIA (Light) (categories 2 and 3 of section 1.2). 
The Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017,
and in particular Schedules 1 and 2, should be referred to determine if an Environmental Assessment
may be required, in which case this technical note will not apply. Furthermore, should the planning
authority decide that a full LVIA should be provided (category 4 of section 1.2) then the guidance in
GLVIA should be followed instead. 
1.4 WHO IS THIS GUIDANCE FOR? 
This technical note has been written to provide guidance to Planning Officers to assess VII’s and LVIA
(Light)’s. It can also be used by applicants and agents to understand the scope and content of the
process. It is not considered that a Landscape Architect would be required to carry out these
simplified Assessments however early discussion with the planning authority is essential to agree the
scope and content. Where the LVIA (Light) is used this should provide clear and objective
information to the planning authority and should not come to firm conclusions as this is for the
planning authority to determine. 
1.5 UNDERSTANDING LANDSCAPE 
Landscape is about the relationship between people and place.  The term does not mean just special
or designated landscape and does not only apply to the countryside.  It results from the way that
different components of our environment – both natural and cultural– interact together and are
perceived. It includes geological factors, habitats, historical and cultural elements as well as visual
qualities. 
Landscape is not limited to countryside but also includes:
 Villages and towns where the built environment is dominant, but also includes the
relationships between buildings and open spaces (townscapes)
 Marine and coastal landscapes (seascapes) 
Examples of key characteristics within each character area might be:
 landform, drainage and water bodies; vegetation and tree cover; human activity such as land
management and use, settlements and buildings;
 The context or setting of the urban area and its relationship to the wider landscape;
 The layout, scale and density of buildings
 Settings of listed buildings (see HES guidance)
 Access and connectivity, including streets and footways/pavements;
 water bodies, water courses and other water features;
 The nature and location of vegetation, including the different types of green space and tree
cover and their relationships to buildings and streets;
 Coastal features;
 Views to and from the sea; 
Page 87

Page 88

4  
1.6 UNDERSTANDING “VISUAL AMENITY” 
Consideration of the interrelationship between people and the landscape means taking into account
the views that people have and their visual amenity. Generally (unless the impact is severe enough
to affect amenity), view from a private property is not a material planning consideration. However
impacts on views from publically accessible locations and such viewpoints are to be appraised as
part of the VII / LVIA (Light). 
The acceptability of the visual effect is largely dependent on the activity the viewer is undertaking
and the resultant experience. Visual effects are appraised in relation to viewpoints from: properties
and settlements; tourist and recreational destinations and transport routes. 
These viewpoints should be agreed with the planning authority prior to undertaking the VII / LVIA
(Light) as part of the Pre-Application (through submission of a preliminary version of the
Sustainability Checklist) 
All identified viewpoints with public access must be visited as part of the field survey and the extent,
character and appearance of their views described. Where appropriate, the existence of temporary
structures or features in the landscape that vary with the seasons and that may therefore affect
visibility, such as deciduous vegetation, should be noted in order to evaluate the worst case situation
in the assessment. 
1.7 CUMULATIVE EFFECTS 
Cumulative effects have been defined in a broad generic sense as “impacts that result from
incremental changes caused by other past, present or reasonably foreseeable actions together with
the proposed development”. Any additional effects caused by the proposed development when
considered in conjunction with other proposed developments of the same or different types
(cumulative effects) will be considered by the Planning Authority. 
1.8 VISUALISATIONS FOR VII / LVIA (Light) 
1.8.1 OVERVIEW 
Photographs show the baseline conditions; visualisations show the proposed situation; and both
combine to simulate the change, for example as photomontages. 
“Technical visualisations” are accurate, objective and unbiased. They can take a variety of forms
including: annotated photographs, wirelines, photomontages and 3D simulations. Plans and sections
are potentially effective ways to communicate to stakeholders, in association with visualisations. 
In contrast “illustrative visualisations” convey the essence of what a proposal would look like in
context. These do not have to be based on specific viewpoints and could, for example, include a
colour perspective. 
To maintain a proportionate approach, different types of visualisations may be required, depending
on the scale of the project and the sensitivity of the landscape – this must be discussed and agreed
with the Planning Authority. Additionally, the number of viewpoints to be illustrated
photographically, and how many of these require visualisations, must be considered in conjunction
Page 88

Page 89

5  
with the Planning Authority prior to undertaking the VII / LVIA (Light) as part of a Pre-Application
(through submission of a preliminary version of the Sustainability Checklist). 
1.8.2 TYPES OF VISUALISATIONS 
Baseline Photography must:
 Be sufficiently up-to-date to reflect the current baseline situation
 Include the extent of the site and sufficient context
 Be presented at a size and relative position, on a corresponding sheet, to allow like-for-like
comparison with the visualisation
 Be based on good quality imagery, secured in good, clear weather conditions wherever
reasonably possible
 Avoid foreground clutter
 If relying on only existing views with no visualisations, clearly identify the extent of the
application site in the view 
Annotated viewpoint photograph must:
 represent context and outline or extent of development and of key features
 be taken with a 50mm lens (if a FFS camera is used) or a 28 or 35mm lens (if a cropped
sensor camera is used)
 use GPS, OS maps or geo-referenced aerial photography for camera/viewpoint location data
 indicate the proposal in the form of sketch / outline / arrows
 use a dedicated viewpoint location plan for viewpoint mapping
 be reproduced at a size which aids clear understanding of the view and context, these simply
show the extent of the site within the view, and annotate and key features within the view. 
3D wireline / model (non photographic) must:
 represent 3D form of development / context
 show massing, wireline or be textured or rendered
 use a dedicated viewpoint location plan for viewpoint mapping
This covers a range of computer-generated visualisation, generally without a photographic context.
Wirelines and other 3D models are particularly suited to graphically describing the development
itself. They use basic graphic information to assist in describing a proposed development and its
context. Computer models generally do not convey landscape context unless they are extremely
sophisticated. Most planning applications should be accompanied by photographs or
photomontages, rather than solely relying on these to convey an impression of a development
proposal. 
Photomontage / photowire must:
 represent appearance, context, form and extent of development
 be taken with a 50mm lens (if a FFS camera is used) or a 28 or 35mm lens (if a cropped
sensor camera is used)
 use GPS, OS maps or geo-referenced aerial photography for camera/viewpoint location data
 show massing, wireline or be textured or rendered
 use a dedicated viewpoint location plan for viewpoint mapping
Page 89

Page 90

6  
 (If the photomontage / photowire is to be scale verifiable then verifiable data will require to
be included)
Site photography forms the basis of the imagery, which is then overlaid by a 3D wireframe, massing
or rendered model. 
Panoramas
 The Landscape Institute state that “printed panoramic images are an imperfect way of
attempting to recreate the experience of viewing the breath of a scene. Nonetheless, where
it is important to communicate the wide-angle nature or context of the view, panoramas are
preferable to limiting the view by cropping”
 In accordance with Landscape Institute guidance wide panoramas on an A3 are too small to
provide a representation of the proposed development
 However panorama photos may be provided to support the application in addition to the
required single images described above 
1.8.3 TECHNICAL NOTES 
It can be a challenge to achieve acceptable levels of exposure of both a bright sky and a dark
landscape. HDR photography combines bracketed images – this can be considered in difficult lighting
situations but should never be taken so far as to produce a visible “artistic” effect. 
GPS equipped cameras will record the location of the shot in the EXIF data, but typically with only
around 5-10m accuracy. Alternatively, if visible fixed references are close to the camera location (eg
gates, surface features) referring to aerial photography within a GIS system may provide greater
positional accuracy. 
OS grid co-ordinates should be recorded where known.
Page 90

Page 91

7   
2.0 VII PROCESS 
2.1 SETTING OUT THE VII DOCUMENT 
This will be a primarily visual document with text used to describe the annotate the maps and
images. 
Please note that there is a 10MB limit for files uploaded to the planning portal. 
2.1.1  INTRODUCTION 
This section should set out:
 The study area and methodology agreed with the planning authority as part of the Pre-
Application process.
 Practical constraints encountered in carrying out the work and assumptions made, if
applicable. 
2.1.2 VISUAL BASELINES 
The information gathered for this section will come from site visits carried out in order to collect the
additional information required to establish the visual baselines. These should be presented as A3
photographs – refer to section 1.9 for guidance. 
2.1.3 THE PROJECT 
Provide a description of the proposed development for the purpose of the assessment, identifying
the main features of the proposals and establishing parameters such as maximum extents of the
development. Include an overview of the design development in response to the site context (siting,
scale, massing, form, detailing, materials) or refer to the separate Design (and Access) Statement if
applicable. Also include description of any alternatives considered. Please refer to TN06
Sustainability and TN07 Sustainable Buildings for further information. 
In terms of the visualisations, whether these are 3D wirelines / models or photomontages /
photowires, they must show how the proposal integrates with the site features. Visualisations must
be presented at the same size as the baselines to allow direct comparison. 
Each drawing should be annotated and the effects and mitigation must be described. Technical
information must be labelled on all photographs. 
Visualisations should be accompanied by a Technical Methodology. Refer to section 1.9 of this
guidance for details of the visualisation types. 
Page 91

Page 92

8  
2.1.4 MITIGATION / ENHANCEMENT 
Explain how the design of the proposals has evolved in order to reflect site characteristics and
mitigate identified adverse effects. 
Page 92

Page 93

9   
` 
PROPOSAL
DEFINE EXTENT OF STUDY AREA
MITIGATION
3.0 LVIA (LIGHT) PROCESS DIAGRAM
DESK STUDY
PRESENT THE INFO THROUGH
MAPS, DRAWINGS,
VISUALISATIONS 
PRE-APPLICATION
Failure to engage with the pre-application
process may result in an unacceptable
LVIA (light) submission which would be
refused by the Planning Authority
FIELD STUDY
ESTABLISH LANDSCAPE BASELINE
 FEATURES
 CHARACTER
 VALUE 
ESTABLISH VISUAL BASELINE
 ZTVs
 WHO AFFECTED
 VIEWS/VIEWPOINTS
Page 93

Page 94

10  
3.1 SETTING OUT THE LVIA (LIGHT) DOCUMENT 
The process diagram on the previous page broadly defines the steps of the process for LVIA (Light).
This will be a primarily visual document with text used to describe the landscape character as well as
the maps and images. 
Please note that there is a 10MB limit for files uploaded to the planning portal. 
3.1.2 INTRODUCTION 
This section should set out:
 Landscape designations and any relevant landscape strategies;
 The study area and methodology agreed with the planning authority as part of the Pre-
Application process.
 Practical constraints encountered in carrying out the work and assumptions made, if
applicable. 
3.1.3 LANDSCAPE AND VISUAL BASELINES 
The information gathered for this section will come from:
 Desk Study: Sources of background information might include OS maps as well as documents
prepared by the planning authority, Historic Environment Scotland, Nature Scot or other
special interest groups or organisations. Use should also be made of any existing historic
studies in order to provide information on the historic and changing character.
 Field Study: Following the desk study, site visits should be carried out in order to collect the
additional information required. 
The landscape baselines should be presented through a series of annotated maps and photographs
accompanied by text. This may require to consider a wider group of character areas rather than just
the immediate area around the site. Character areas may be defined my consideration of the key
characteristics set out in section 1.6. As well as the key characteristics, any other sensitive receptors
should be identified. Any designations and/or landscape studies should be identified and analysed. 
The visual baselines should be presented as A3 photographs – refer to section 1.9 for guidance. 
3.1.4 THE PROJECT 
Provide a description of the proposed development for the purpose of the assessment, identifying
the main features of the proposals and establishing parameters such as maximum extents of the
development. Include an overview of the design development in response to the site context (siting,
scale, massing, form, detailing, materials) or refer to the separate Design (and Access) Statement if
applicable. Also include description of any alternatives considered. Please refer to TN06
Sustainability and TN07 Sustainable Buildings for further information. 
Changes to the landscape character should be detailed through text and accompanied by maps and
photos, directly relating to those included in the baseline assessment where relevant. The
Page 94

Page 95

11  
assessment should consider how the proposal will affect the elements that make up the landscape,
its aesthetic and perceptual aspects, its distinctive character and the key characteristics that
contribute towards this. 
In terms of the visualisations, whether these are 3D wirelines / models or photomontages /
photowires, they must show how the proposal integrates with the site features. As with the maps, 
visualisations will typically be presented as two related sheets: baseline photograph and
photomontage. Again these should be presented at the same size to allow direct comparison. 
Each drawing should be annotated and the effects and mitigation must be described. Technical
information must be labelled on all photographs. 
Visualisations should be accompanied by a Technical Methodology. Refer to section 1.9 of this
guidance for details of the visualisation types. 
3.1.5 MITIGATION / ENHANCEMENT 
Explain how the design of the proposals has evolved in order to reflect site characteristics and
mitigate identified adverse effects. 
Page 95

Page 96

4.0 FURTHER READING 
Guidelines for Landscape and Visual Impact Assessment, 3rd edition (GLVIA3), Landscape Institute
and IEMA 
Visual Representations of Development Proposals – Technical Note 06/19, Landscape Institute 
5.0 APPENDICES 
Appendix 1 - To provide an example of how the Planning Authority expects visualisations to be
completed, a site in a countryside zone was selected at random. The use of this site as an example
has not and does not prejudice any applications in any way. To provide a contrast and a fuller
example of the purpose and merit of visualisations, a further site was selected to demonstrate how
the design which was considered to be suitable for the first site, would not work on a different type
of site, and a further architectural model was created to then show the difference the house type
can make on a sensitive site. The latter site was selected to demonstrate an open landscape site in
comparison to the main study, to show the importance of massing and colour. This site is not, and
has not been, the subject of any planning application and has been selected only as a demonstration
for visual impact. No assessment has been made whether this site would comply with planning
policy in any other regard. This sample would also provide the basis for the visualisations for both VII
and LVIA (Light). 
Appendix 2 – Template for setting out VII. Note that there is no requirement to use this should other
software be preferred, however the layout should largely be followed. 
Appendix 3 – Template for setting out LVIA (Light). Note that there is no requirement to use this
should other software be preferred, however the layout should largely be followed. 
Page 96

Page 97

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light)
_______________________________________________________________________________________________________________________________________________________________________________________________
CONTENTS
The sections shown in italics are included as part of this sample to further aid understanding of things to avoid as well as demonstrate different site sensitivities. These sections would not form
part of a standard VII / LVIA (Light) submission
1.0 INTRODUCTION 
1.1 Purpose of this document
2.0 BASELINES
2.1 Plan annotated with baseline photographs 
2.2 Baseline photographs 
2.3  Examples of photos that do not properly aid the visualisation
3.0 THE PROJECT
3.1 Visualisations matching the baseline photos, at A3 each
3.2 Questions to ask of the visualisation 
4.0  VISUALISATIONS OF COMPARISON SITE
1.0 INTRODUCTION
1.1 Purpose of this document
This is a set of visualisations in relation to a proposed dwellinghouse on a greenfield site near to the key rural settlement of Taynuilt. As the site sits within the countryside zone, under LDP2 Policy 02 a VII or LVIA
(Light) may be required and these visualisations would be incorporated in either of these assessment types. To provide contrast and a fuller example of the purpose and merit of visualisations, a comparison site was
selected to demonstrate how the design which was considered to be suitable for the first site, would not work on a different type of site, and a further architectural model was created to show the importance of
massing and colour.
Appendix 3
Page 97

Page 98

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
2.0 BASELINES 
2.1 Plan annotated with baseline photographs 
© Crown Copyright 2021 – Ordnance Survey license number 100023368
4 
3 
2 
1 
Page 98

Page 99

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
2.2 Baseline photos 
Close view of the site at existing access point from public road.
OBSERVATION: The site only becomes visible from the road in the vicinity of the access point,
otherwise the site is well screened.
TECHNICAL: 50mm lens on Full Frame Sensor camera (Canon 5D
Mk III); f/11, 1/200, ISO 1000
Local housing style to the north – dating from 1960’s or 70’s
1 
Page 99

Page 100

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
Close view of the site approximately 10m south of access gate, from public road.
OBSERVATION: The site becomes gradually more screened to the south, even in autumn/winter (photo taken in November)
TECHNICAL: 50mm lens on Full Frame Sensor camera (Canon 5D Mk III); f/8, 1/100, ISO 1250
2 
Page 100

Page 101

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
3 
Distant view of the site from track above Fairy Hill Croft.
OBSERVATION: This was the only point on the path where the dilapidated corrugated building
became visible. Otherwise it was screened behind trees.
TECHNICAL: 50mm lens on Full Frame Sensor camera (Canon 5D Mk III); f/11, 1/200, ISO 640
Taynuilt settlement
Page 101

Page 102

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
4 
Distant view of the site from A85
OBSERVATION: At no point on the road was the site visible as it is screened by trees – no visualisation
required from this view
TECHNICAL: 50mm lens on Full Frame Sensor camera (Canon 5D Mk III); f/11, 1/200, ISO 640
Page 102

Page 103

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
2.3  Examples of photos that do not properly aid the visualisation  
Using a wide lens gives a wider view of
the site than in reality and makes objects
(i.e. the corrugated iron building) appear
further away than they really are.
TECHNICAL: 24mm lens on Full Frame
Sensor camera (Canon 5D Mk III); f/11,
1/200, ISO 640
Using a wide lens from a distant viewpoint
makes the site appear further away and
more difficult to see than in reality.
TECHNICAL: 24mm lens on Full Frame
Sensor camera (Canon 5D Mk III); f/11,
1/200, ISO 500
Underexposed image makes it difficult to see
the site whereas the corrugated building can
clearly be seen in the correctly exposed image.
TECHNICAL: 50mm lens on Full Frame
Sensor camera (Canon 5D Mk III); f/11, 1/200,
ISO 250
Using a telephoto lens from a distant viewpoint
makes the site appear closer and more
prominent than in reality..
TECHNICAL: 200mm lens on Crop Sensor
camera (Canon 7D Mk II) = 320mm effective
focal length; f/11, 1/250, ISO 640
Page 103

Page 104

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
3.1 Visualisations matching the baseline photos, at A3 each
Showing the proposal from the access point to the site
OBSERVATION: the house and garage are clearly visible from this viewpoint, the 2 storey massing and white colour make the building
prominent. However this is a view from a point between 2 built up areas featuring houses of similar massing and colour. The viewpoint is
considered to be of low sensitivity. The access point in the only point along this road where the site becomes clearly visible due to the
screening by trees at either side of the access gate. 
1 
Page 104

Page 105

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
2 
Showing the proposal from approximately 10m south of the access gate
OBSERVATION: as the viewer moves south the house becomes screened by trees, starting from approximately 10 metres south of the
access gate and become increasingly screened. From this angle only part of the proposed development can be seen (part of the garage). 
Page 105

Page 106

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
3 
Showing the proposal from the distant viewpoint of the track above Fairy Hill Croft
OBSERVATION: the viewpoint is of higher sensitivity than Viewpoint 1, however the proposed dwellinghouse and
garage are barely visible as they are screened by trees. The red outline shows their presence behind the trees which
could become visible should the trees be removed. However even if the trees to the front of the site were removed
the development would still be well enclosed by trees to the rear, grounding it into the site. 
Page 106

Page 107

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
Note: in cases where a higher number of viewpoints can be identified, a visualisation should be included for each of these so on many sites a higher number of visualisations may be required. 
3.3 Questions to ask of the visualisations 
It is recommended that the applicant/agent refers to the TN06 Sustainability and TN07 Sustainable Buildings. 
The Process
 Has the site context been considered and utilised appropriately to inform the design 
 Have all key views been incorporated
 Is the photography correct – i.e. use of correct focal length and exposure
 Are there extant planning applications that need to be modelled for incorporation in any of the visualisations 
The design 
 Has the building/ have the buildings been most appropriately sited – consider whether re-siting of the proposal would avoid ridgeline development or incorporate better screening 
 Is the scale and massing appropriate for the site and context – would a re-design to result in a reduction in scale or height avoid unacceptable visual impact
 Is the architectural design appropriate for the site rather than being a copy of a dwelling designed for an urban location
 Are the colours / materials  appropriate – consider whether darker colours or materials may be required to limit visual prominence from key viewpoints
 Consider incorporating basic visualisations of design development options which will help to demonstrate how the best siting and design solution has been reached for the particular site 
Note: this sample VIA does not advocate the design merits of the proposal is, nor does it advocate that the siting, scale, massing, colours and materials are the most suitable for the site, which is a step that
applicants/agents should undertake themselves as part of the process. In this case the siting and design in this location would be considered to comply with policy and so no further comment is made. 
Page 107

Page 108

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
4.0 VISUALISATIONS OF COMPARISON SITE 
Close viewpoint using original example design
OBSERVATION: due to the open nature of the site the white colour
and the two storey massing do not sit sensitively within the site 
All photos taken at 50mm on Full Frame Senson Camera at f/9, 1/100, ISO 1000, showing how on an alternative site the same design considered suitable on
the original site may not be considered appropriate. Further visualisations of an alternative design (single storey, black aluminium clad) demonstrate how a
different design might better fit a more sensitive site. 
Page 108

Page 109

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
Distant viewpoint using original example design
OBSERVATION: An existing dwellinghouse to the left can be
seen nestled into the landscape which is of a colour and form
that blends in well. In contrast, the two storey white house is
far too prominent in this open sensitive landscape. 
Page 109

Page 110

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
Close viewpoint using an alternative design
OBSERVATION: This alternative design is lower in height and is clad
in a dark colour (black metal). On the same site where the two storey
white house did not sit sensitively, this integrates well with its context. 
Page 110

Page 111

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
Distant viewpoint using an alternative design
OBSERVATION: This alternative design is lower in height and is clad in
a dark colour (black metal). On the same site where the two storey
white house did not sit sensitively, this integrates well with its context. 
Page 111

Page 112

TN21 Appendix 1: Sample Visualisations for VII or LVIA (Light) 
_______________________________________________________________________________________________________________________________________________________________________________________________
This is an example and not a formal policy assessment against either of the sites or designs contained herein. 
The two designs for side by side comparison: 
Page 112

Page 113

TN21 Appendix 2: VII Template
_______________________________________________________________________________________________________________________________________________________________________________________________
CONTENTS
1.0 INTRODUCTION
1.1 Purpose of this document
1.2 Study area and methodology
1.3 Unimplemented but extant planning consents in the vicinity
1.4 Limitations of the study
2.0 VISUAL BASELINES
2.1 Plan annotated with baseline photographs
2.2 Baseline photographs 
3.0 THE PROJECT
3.1 Project Description 
3.2 Visualisations matching the baseline photos, at A3 each
4.0 MITIGATION / ENHANCEMENT
Appendix 4
Page 113

Page 114

TN21 Appendix 2: VII Template
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.0 INTRODUCTION 
1.1 Purpose of this document 
Page 114

Page 115

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.2 Study area and methodology 
Page 115

Page 116

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.3 Unimplemented but extant planning consents in the vicinity 
Page 116

Page 117

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.4 Limitations of the study 
Page 117

Page 118

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.0 VISUAL BASELINES 
2.1 Plan annotated with baseline photographs 
Page 118

Page 119

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.2 Baseline photos (including observations and technical information – 1 photo per A3 sheet)) 
Page 119

Page 120

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
3.0 THE PROJECT 
3.1 Project Description 
Page 120

Page 121

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
3.2 Visualisations matching the baseline photos, at A3 each (including observations)  
Page 121

Page 122

TN21 Appendix 2 VII Template 
_______________________________________________________________________________________________________________________________________________________________________________________________ 
4.0 MITIGATION / ENHANCEMENT 
Page 122

Page 123

TN21 Appendix 3: LVIA (Light) Template
_______________________________________________________________________________________________________________________________________________________________________________________________
CONTENTS
1.0 INTRODUCTION
1.1 Purpose of this document
1.2 Landscape strategies
1.3 Landscape designations
1.4 Study area and methodology
1.5 Unimplemented but extant planning consents in the vicinity
1.6 Limitations of the study
2.0 LANDSCAPE BASELINES
2.1 Background information and maps
2.2 Plan annotated with character areas
2.3.1 Plan annotated with baseline photographs (Character Area 1)
2.3.2  Baseline photographs (Character Area 1)
2.4.1 Plan annotated with baseline photographs (Character Area 2)
2.4.2 Baseline photographs (Character Area 2)
2.5.1 Plan annotated with baseline photographs (Character Area 3)
2.5.2 Baseline photographs (Character Area 3) please create further sections for additional character areas as required
2.6 Analysis of character areas
3.0 VISUAL BASELINES
3.1 Plan annotated with baseline photographs
3.2 Baseline photographs 
4.0 THE PROJECT
4.1 Project Description 
4.2 Analysis of how the project would affect the landscape character
4.3 Visualisations matching the baseline photos, at A3 each
5.0 MITIGATION / ENHANCEMENT
Appendix 5
Page 123

Page 124

TN21 Appendix 3: LVIA (Light) Template 
_______________________________________________________________________________________________________________________________________________________________________________________________
1.0 INTRODUCTION 
1.1 Purpose of this document 
Page 124

Page 125

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.2 Landscape Strategies 
Page 125

Page 126

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.3 Landscape designations 
Page 126

Page 127

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.4 Study area and methodology 
Page 127

Page 128

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.5 Unimplemented but extant planning consents in the vicinity  
Page 128

Page 129

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
1.6 Limitations of the study 
Page 129

Page 130

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.0 LANDSCAPE BASELINES
2.1 Background information and maps  
Page 130

Page 131

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.2 Plan annotated with character areas  
Page 131

Page 132

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.3.1 Plan annotated with baseline photographs (Character Area 1)  
Page 132

Page 133

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.3.2  Baseline photographs (Character Area 1)  
Page 133

Page 134

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.4.1 Plan annotated with baseline photographs (Character Area 2)  
Page 134

Page 135

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.4.2 Baseline photographs (Character Area 2)  
Page 135

Page 136

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.5.1 Plan annotated with baseline photographs (Character Area 3)  
Page 136

Page 137

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.5.2 Baseline photographs (Character Area 3) please create further sections for additional character areas as required  
Page 137

Page 138

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
2.6 Analysis of character areas 
Page 138

Page 139

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
3.0 VISUAL BASELINES
3.1 Plan annotated with baseline photographs 
Page 139

Page 140

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
3.2 Baseline photographs 
Page 140

Page 141

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
4.0 THE PROJECT
4.1 Project Description 
Page 141

Page 142

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
4.2 Analysis of how the project would affect the landscape character  
Page 142

Page 143

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
4.3 Visualisations matching the baseline photos, at A3 each 
Page 143

Page 144

LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA Light) AS REQUIRED BY ARGYLL AND BUTE LDP2 POLICY 70 / POLICY 71
_______________________________________________________________________________________________________________________________________________________________________________________________ 
5.0 MITIGATION / ENHANCEMENT 
Page 144

Page 145

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
.
Argyll and Bute Local
Development Plan 2
TN07 SUSTAINABLE
BUILDINGS
Appendix 6
Page 145

Page 146

TN07 SUSTAINABLE BUILDINGS 
Sustainable Development can be defined as being “development that meets the needs of the
present without compromising the ability of future generations to meet their own needs” (The
Brundtland Definition, as sourced in Appendix F of NPF4). 
Prior to reading this technical note, applicants should have read TN06 Sustainability which provides
guidance on the wider considerations of siting a development in the natural or built landscape as
well as the impact of a development on the community, economy and environment. 
This technical note provides additional detail to policy 09 Sustainable Design of the adopted Argyll
and Bute Local Development Plan 2 (LDP2). 
Aesthetic design considerations will follow and compliment sustainable building considerations, and
this is covered in Policy 10 Design- All Development and the council’s Design Guidance (which is
intended to be consolidated and updated during the Plan period). 
1.0 FABRIC FIRST APPROACH 
 Following on from siting the building to maximise energy efficiency (refer to TN06
Sustainability), the building envelope should be designed in a way to minimise the heat loss
as well as the materials used. This means considering the form and scale of the building so
as not create unnecessary additional external wall areas, or a building which is larger than is
required. 
 The design of the building should allow for future adaptability and incorporate space for
home working, along with suitable WiFi provision. 
 The materials selected should contribute towards Scotland’s net-zero carbon targets.
Buildings design should maximise the performance of the building materials and
components first, before considering the use of mechanical or electrical building services
systems. 
 The lifecycle of the development, its materials and components should be considered at the
start of the project. Higher quality materials may be more expensive at the outset but may
perform better and for longer. 
 Building materials should have a low environmental impact e.g. from sustainable
manufacturing processes, be recycled and/or be local. 
Page 146

Page 147

2.0  RENEWABLES AND WATER 
 Renewable energy sources such as solar panels may in some cases be suitable, however
consideration should be given to the embodied energy in the creation of these. 
 Also refer to Technical Note on Minimising Water Consumption for detail on water saving
technologies, grey water systems and sustainable water systems. 
3.0 ANCILLARY DEVELOPMENT, PARKING AND LANDSCAPING 
 Outbuildings should relate to the main building in form and design and be carefully
positioned on the site, relating to the main building. 
 Landscaping can significantly assist the integration of new development within the built or
natural environment. Landscaping can take the form of soft or hard features and performs
its function best when designed as an integral aspect of a new design. 
 Hard landscaping should be kept to a minimum 
 Consideration should be given to LDP2 policy 06 Green Infrastructure 
4.0  THE CHECKLIST AND PARALLEL CONSIDERATIONS 
A Sustainable Buildings checklist has been prepared as an Appendix to this Technical Note which
must be completed and submitted with all applications. Separately, a Sustainability Checklist (TN06)
covering the wider impacts of siting a development in the natural or built landscape as well as of the
development on the community, economy and environment must be submitted. 
Page 147

Page 148

APPENDIX TO TN07: SUSTAINABLE BUILDINGS CHECKLIST 
It is mandatory that potential developers complete this checklist for all applications for
development. It is intended that by completing the checklist the applicant could take the
opportunity to review the sustainability of their project and make changes to their application,
where appropriate and to ensure compliance with LDP policies. Not every criterion will be relevant
for every development, for example extensions, in which case “not applicable” should be noted in
the details column.   
FABRIC FIRST  Give details
Provide details of any proposals to use
re-cycled or locally sourced materials? 
What measures will be taken to
reduce construction site waste 
What construction materials will be
used to reduce embodied energy? 
Does the design provide adaptability
for changing needs over time? If so,
explain how 
Demonstrate how the design provides
dedicated space for home working? 
Has fibre broadband or Wi-Fi
infrastructure been installed to allow
home working? 
Have the energy requirements for the
building been calculated? If so,
provide details of this. 
Page 148

Page 149

RENEWABLES AND WATER (see also
Technical Working Note on
Minimising water Consumption) 
Give details
What percentage of the total building
energy demand will be produced from
on-site renewable energy
technologies. 
Outline how space/water heating,
cooling and lighting will be delivered
using low or zero carbon technologies. 
Provide details of any water saving
technologies to be employed such as
aerated shower and tap heads? 
Provide details of any measures which
have been adopted to re-use ‘grey
water’ or harvest rainwater? 
Has a sustainable waste water system
been designed to avoid pollution of
the water environment? If so, provide
details. 
ANCILARY DEVELOPMENT, PARKING
AND LANDSCAPING
Give details 
Provide details of the provision for on-
site storage of waste and recyclates? 
Provide details of allowance for
bicycle storage? 
Page 149

Page 150

Does the development have an
electric car charging point? 
Provide details of any porous
surfacing materials for drives, paths
and hardstandings? 
Page 150

Page 151

ARGYLL AND BUTE COUNCIL
DEVELOPMENT AND ECONOMIC
GROWTH 
PPSL COMMITTEE 
18 OCTOBER 2023 
FOOD CONTROL LAW ENFORCEMENT PLAN 2023-2025 
1.0 Executive Summary   
1.1 The Council. as a statutory food authority under the Food Safety Act
1990 and associated statutes, must ensure that it delivers, principally
through environmental health, a service which is adequately
resourced to meet the requirements of a national Code of Practice
(hereafter referred to as FLCOP) issued by Food Standards Scotland
(hereafter referred to as FSS). The FLCOP also requires food
authorities to have a formal food control law enforcement plan
approved by the appropriate Committee.   
1.2 Our aims are to protect public health and promote the production of
safe food onto the market. The food and drink sector is significant to
the economy and reputation of Argyll and Bute, and regulation seeks
to support compliant businesses and target non-compliant
businesses. Notwithstanding this, the Council have a statutory
responsibility to deliver a service which meets the requirements of
FLCOP. 
1.3 The Planning, Protective Services and Planning Committee approved
the Regulatory Services Work Plan 2023-25 on the 21 June 2023. This
overarching plan covered the wide range of priorities across
Regulatory Services, included the statutory food control enforcement
role carried out by environmental health. The Food Control Law
Enforcement Plan 2023-23 provides more detail   
1.4 Recommendations 
1.4.1 Members are asked to recognise the work by environmental health
to protect food safety in Argyll and Bute. 
1.4.2 Members are asked to approve the Food Control Law Enforcement
Plan 2023-25 and reaffirm the statutory appointments of the Council’s
Head of Food Safety, Lead Officer (Food Control) together with the
appointments of authorised Officers of the Council, and the Councils
Public Analyst, Agricultural Analyst and Food Examiner
arrangements. 
Page 151 Agenda Item 8

Page 152

ARGYLL AND BUTE COUNCIL
DEVELOPMENT AND ECONOMIC
GROWTH 
PPSL COMMITTEE
18 OCTOBER 2023 
FOOD CONTROL LAW ENFORCEMENT PLAN 2023-2025 
2.0 INTRODUCTION   
2.1 The Council, as a statutory food authority under the Food Safety Act
1990 and associated statutes, must ensure that it delivers, principally
through environmental health, a service which is adequately resourced
to meet the requirements of a national Code of Practice (hereafter
referred to as FLCOP) issued by Food Standards Scotland (hereafter
referred to as FSS as appropriate). The FLCOP also requires food
authorities to have a formal food control law enforcement plan approved
by the appropriate Committee.   
2.2 The Planning, Protective Services and Planning Committee approved
the Regulatory Services Work Plan 2023-25 on the 21 June 2023. This
overarching plan covered the wide range of priorities across Regulatory
Services, included the statutory health and safety enforcement role
carried out by environmental health. The Food Control Law
Enforcement Plan 2023-23 provides more detail   
3.0 RECOMMENDATIONS   
3.1 Members are asked to recognise the work by environmental health to
protect food safety in Argyll and Bute.   
3.2 Members are asked to approve the Food Control Law Enforcement
Plan 2023-25 and reaffirm the statutory appointments of the Council’s
Head of Food Safety, Lead Officer (Food Control) together with the
appointments of authorised Officers of the Council, and the Councils
Public Analyst, Agricultural Analyst and Food Examiner arrangements. 
4.0 DETAIL   
4.1 The food sector in Argyll and Bute differs significantly from many other
local authorities, as we have a very large processing and manufacturing
sector (fish and shellfish) together with the “normal” retail, catering and
tourism related businesses. There are 2419 food business across
Argyll and Bute categorised for interventions based on the risk they
pose to food safety. This includes 55 approval sector premises,
exporting food products internationally, categorised as high risk due to
the potential risks from their processes failing to food safety and
reputational risks to Argyll and Bute, and to Scotland. There are also 45
other manufacturing and processing food businesses   
Page 152

Page 153

4.2 The requirements for a Council’s food safety regulation activities are
detailed in the Food Standards Agency Code of Practice and
Framework Agreement. They prescribe full compliance with the Code
and their expectations, including inspection frequencies for food
business operators.  The Council do not have sufficient resource to
meet the full extent of the Code and from an operation management
perspective; we target our resources on areas of greatest risk, at the
expense of low risk activities.   
4.3 The Planning, Protective Services and Planning Committee approved
the Regulatory Services Work Plan 2023-25 on the 21 June 2023. This
overarching plan covered the wide range of priorities across
Regulatory Services, included the food control enforcement role
carried out by environmental health. The Food Law Enforcement Plan
2023-25 provides more detail.   
4.4 The role of the Regulatory Services and Building Standards
Manager is to prepare a plan which protects food safety and
standards based on available resources as advised by the Lead
Officer (Food Control). There are insufficient resources or budget to
meet the full requirements of the FLCOP. Accordingly, working with
the Lead Officer a risk and intelligence-based approach focussing
resources upon areas of highest risk, including high risk FBOs is
proposed. Priority will be given to the approved and high risk
manufacturing sectors, and businesses who provide to vulnerable
groups. Otherwise, the approach will be intelligence-led/informed,
responding to incidents and suspected or confirmed outbreaks. 
5.0 CHALLENGES   
5.1 The previous FSS audit report identified that the Council does not
have adequate capacity or capability to undertake our statutory
responsibilities. This situation remains, despite delivering a food safety
improvement plan, with resources remaining a major concern. 
5.2 There is a resource gap of 5 FTE authorised food control officers
between the current establishment and that required to deliver the
FLCOP. This is despite creating a new post dedicated to food
control in 2022 and the gap has increased with long-term
recruitment difficulties across Regulatory Services. At present there
is 3 EHO vacancies across the team, equating to 0.7 FTE food
safety resource. 
5.3 This approach to managing risk by targeting available resources is
wholly appropriate in our circumstances. There is a risk that a future
FSS audit will identify that the plan and food safety arrangements
are inadequate to deliver the full range of statutory requirements of
food control which could lead to a formal direction from the Minister
requiring the Council to take appropriate measures. Discussion with
the FSS have identified that they recognise that we have insufficient
resources, like many other local authorities, and are supportive of
the risk-based approach advocated in the Plan, although they are
seeking the Council to increase our food safety resources. 
5.4 There is a shortfall of 183 FTE across all Scottish authorities and
given wide non-compliance with the FLCOP, a national Scottish
Authority Food Enforcement Re-Build (SAFER) project has been
established between LAs and FSS working collaboratively with the
Page 153

Page 154

purposes of identifying how current resources can be most
effectively deployed to address national and local priorities, to
restore resources in the longer term, to revise the FLCOP and
protect food safety and standards most effectively in the future. 
5.5 Export market. An indirect consequence of EU Exit has been the
need for export business to remodel their processes to meet
increasing demands for exporting to the EU. As a consequence,
many of the large companies are directing consignment through
commercial hubs, rather than requesting export health certificates
from their local authorities. As a result, the number of export health
certificate requests has reduced by 60% in Argyll and Bute, with a
subsequent reduction in income. 
6.0 FOOD CONTROL LAW ENFORCEMENT PLAN 2023-25   
6.1 The service does not have sufficient budget to provide the resources
required to meet the key requirements of the FLCOP and the food
safety challenges in Argyll and Bute. This situation is exacerbated
by the national shortage of environmental health officer and food
safety officers. 
The 2023-25 work plan has been developed to minimise the risks
by targeting our current resources. The Plan and service priorities
are attached Appendix 1 of this report. Key issues to highlight are: 
a. Section 4.1 details the achievements over the last year ,
including the restart of food enforcement services post-
pandemic, targeted enforcement activity, training to increase
the competency of our authorised officers, supporting food
businesses including attestations and the issue of 587 export
health certificates; and the investigation of national and local
food incidents or outbreaks. 
b. Section 5 details the priorities for the duration of this plan.
These include a high risk focussed interventions program as
outlined in section 5.2.1, a food sampling and monitoring
program, and better use of digital technology, including
remote verification interventions. 
6.2 The Council has a formal Service Level Agreement with Glasgow
Scientific Services (GSS) for the provision of laboratory services,
including the microbiological examination and the analysis of
foodstuffs and feed. The Council requires to make statutory
appointments for specialist support services and this plan seeks
approval of Glasgow Scientific Services and named staff to meet the
requirements for a public analyst, food examiner and agricultural
analyst. These appointments are detailed in Appendix II of this plan. 
7.0 ENFORCEMENT POLICY   
7.1 Our Enforcement Policy seeks to support compliant businesses and
to take formal action where there are significant risks or a history of
non-compliance. It is founded upon the principles of proportionality,
appropriateness, consistency, targeted and risk-based, which are
compliant with the Scottish Government’s Regulatory Strategic Code. 
Page 154

Page 155

7.2 The Food Control Law Enforcement Policy has been reviewed and
is presented for approval. It meets the requirements of the National
Code, the Scottish regulators’ strategic code of practice and the
Council’s Enforcement Policy. There are no changes to the policy
previously approved by Committee. 
8.0 CONCLUSIONS   
8.1 The role of Environmental Health is critical in protecting public health,
supporting compliant businesses, targeting and enforcing non-
compliance, addressing food safety risks and supporting the economy
of Argyll and Bute. Much of this work goes unrecognised, and only
comes to the fore when there are incidents, food poisoning outbreaks,
such as outbreaks of E.coli 0157, Listeria (it is noteworthy that the
Council is currently involved in investigating a nationwide outbreak)
and export demands where business viability within a fragile economy
depends on the service provided. 
8.2 The Council do not have sufficient resources to deliver its statutory
food requirements and our approach for some years has been to
adopt a risk-based approach focussing on high risk priorities. Previous
audits by FSS have identified critical resourcing issues and this has
been exacerbated by the lack of qualified and experienced
environmental, health officers and food safety officers nationally 
8.3 The Food Law Enforcement Plan 2023-25 effectively targets our
limited resources to provide the best protection for food safety.
Whilst the intention is to bring a further report back to Committee on
resourcing and performance against the plan, the Regulatory
Service’s and Building Standards Manager commends the plan and
enforcement policy for member’s approval. 
9.0 IMPLICATIONS   
9.1 Policy Meets the National Code and the Regulatory
Performance Agenda 
9.2 Finance None. Plan has been developed to reflect existing
budget and available resources. 
9.3 Legal Meets the Council’s statutory duty, although the
Plan does not meet the full requirements of a food
authority under the FLCOP 
9.4 HR None 
9.5 Fairer Scotland 
9.5.1 Equalities None 
9.5.2 Socio-economic None 
9.5.3 Islands None 
9.5.4 Climate change None 
9.6 Equalities None 
9.7 Risk The major risks are lack of available resource and
competing operational priorities.  These are being
managed, with the critical risks being:
i. The Council is not meeting the full
requirements of statutory duties and of
the FLCOP with significant public health
implications in terms of the safety, the
authenticity and integrity of food.
Page 155

Page 156

ii. That operational priorities and reactive
work continues to increase and diverts
resources from our Improvement Plan.
iii. The consequences of a serious
foodborne disease outbreak in Argyll and
Bute will impact on the health of the
consumer, the reputation of the Council
and the food sector, and has potential
implications to trade, market and
economy. 
9.8 Customer Service None 
Executive Director with responsibility for Environmental Health: Kirsty
Flanagan 
Policy Lead: Councillor Kieron Green 
For further information contact: Alan Morrison, Regulatory Services and Building
Standards Manager (Alan.Morrison@argyll-bute.gov.uk    01546 604292) 
Appendix 1:  Food Control Law Enforcement Work Plan 2023-25 
Page 156

Page 157

FOOD SERVICE PLAN 2023-25 FINAL 091023      
Appendix 1 
Food Control Enforcement Plan 
2023-2025 
Page 157

Page 158

P a g e | 2  FOOD SERVICE PLAN 2023-25 FINAL 091023
1. SERVICE AIMS AND OBJECTIVES   
1.1 Aims and Objectives   
The Council’s Regulatory Services is committed to the aim of protection of public
health.   
The Council is a competent authority under retained Regulation (EU) 2017/625 of the
European Parliament and the Council on Official Controls, a statutory food authority
under the Food Safety Act 1990 and a delegated competent authority under Food
Hygiene (Scotland) Regulations 2006  Therefore, the Council aims to ensure that all
food and drink, intended for sale for human consumption, which is produced, stored,
distributed, handled or consumed within or exported from Argyll and Bute does not
pose a significant risk to the health or safety of the consumer and the consumer is
not prejudiced by it.   
The term Food Control, for the purposes of this plan is integrated and
comprehensively provides for the protection of the consumer, comprising food safety,
food hygiene, food standards, food authenticity and Integrity, food information and
food fraud/crime.   
Regulatory Services, consistent with available resources seeks to achieve protection
of the consumer through the following objectives:- 
 To undertake the statutory enforcement role of a competent body “according
to retained Regulation (EU) 2017/625, in accordance with retained Regulation
(EU) No 2019/627 - and under the Food Hygiene (Scotland) Regulations
2006 an as a Food Authority” under the Food Safety Act 1990 working in
accordance with service standards and specific requirements and guidance
from Food Standards Scotland and DEFRA. This includes particular
reference to the Food Law Code of Practice (hereafter referred to as FLCOP)
and the Interventions Code of Practice (ICP) published by Food Standards
Scotland. 
 To provide an effective food control service focusing limited resources
according to a risk-based approach and ensuring that all enforcement activity
is also risk based, balanced, proportionate, reasonable, evidence based,
consistent with the FLCOP, (notably the compliance spectrum), and is
consistent with the Scottish Regulators' Strategic Code of Practice 
 To develop, a Food Control Service Plan (i.e. this plan) which will confirm the
key priorities, themes and the work to be undertaken. In summary, the key
priorities of this plan focus limited resources upon the highest risk FBOs and
on innovation with the purpose of deploying these resources as effectively as
possible. 
 To work with and support local Food Business Operators (hereafter referred
to as FBO’s) in an open and transparent manner, to improve the safety, the
authenticity and the integrity of food and the level of compliance with relevant
legislation, in line with the Service's Enforcement Policy 
 To provide Food Control advice to FBOs, the consumer and other
stakeholders. Including FBOs applying for approval under regulation (EC)
853/2004 acknowledging that effective impartial advice at the outset is the
most effective preventative approach. 
Page 158

Page 159

P a g e | 3  FOOD SERVICE PLAN 2023-25 FINAL 091023
 To maintain adequate systems including a computer-based inspection
programme and reporting system, designed to improve the quality of food
control enforcement, data, management information and reporting   
1.2 Links to Corporate  Plan 
This plan links to the Council’s corporate policy outcomes of promoting a sustainable
economy; protecting our communities and the wider health protection agenda.   
2. BACKGROUND   
2.1 Profile and the Local Authority   
Argyll and Bute Council is a unitary authority, with a resident population of 86,130
and a geographical area of 690,889 hectares, including 23 inhabited islands, located
within the west Highlands of Scotland.   
2.2 Organisational Structure   
Regulatory Services delivers the Council’s statutory food control law enforcement
role in a team which provides the range of services within environmental health,
animal health, and licensing standards. This service is located within the
Development and Infrastructure Directorate in Development and Economic Growth.   
Regulatory Services is managed at a third-tier level through the Regulatory Services
and Building Standards Manager with operational management being provided by
the Environmental Health Manager (East) and Environmental Health Manager
(West).  There is no specific food control team as officers undertake generic work
relating to their profession, although the lead for the operational management of
Food Control rests with the Environmental Health Manager (West). The lead for the
professional, operational (including enforcement) and technical aspects of Food
Control is taken by the Lead Officer in Food Control, (Environmental Health officer
(Food Control and Service Support) ) responsible for exercising the operational lead
in Food Control and maintaining the interventions, qualifications and enforcement
required by the FLCOP.   
Regulatory Services refers reports to the Planning Protective Services and Licensing
Committee or the full Council as determined by the nature of the report. In addition,
the service has access to the other Committees and the Argyll and Bute Licensing
Board.   
The Councils statutory appointments required under the Food Safety Act 1990
through the FLCOP and in accordance with retained Regulation (EU) 2017/625 are 
Head of Food Safety Regulatory Services and 
Building Standards Manager  
Lead Officer – Food Control Environmental Health Officer 
(Food Control and Service Support)  
Management Lead – Food Control Environmental Health Manager (West)   
A review of these statutory appointments against the requirements of the FLCOP is
ongoing as part of the service redesign process, specified in the Regulatory Services
Service Plan 2023-25. 
Page 159

Page 160

P a g e | 4  FOOD SERVICE PLAN 2023-25 FINAL 091023 
2.3 The Scope of the Food Service   
Official controls are undertaken principally by authorised Environmental Health staff,
although some work is undertaken by Animal Health and Welfare staff. The Service
continues to review roles and responsibilities in respect of food as far as the FLCOP
allows, to integrate work across disciplines so we can make better use of the wider
service resource.   
The Service recognises that food control management systems operated by FBOs
do occasionally fail. In such situations the Service responds as a priority and will
continue to do so by investigating and controlling communicable disease outbreaks,
investigating incidents, complaints and intelligence reports. Such responses are in
accordance with the Service’s Food Control Enforcement Policy, the FLCOP and
with applicable guidance.   
Animal Health and Welfare Officers undertake primary production activities into the
animal health inspection protocols for targeted businesses   
The service priorities detailed in this Food Plan are determined through statutory
duties, the FLCOP; national, local and service priorities.  The Council’s Enforcement
Policies and food control procedures whilst internal monitoring informs the standards
for this work.   
2.4 Laboratory Arrangements   
The Council has a formal Service Level Agreement with Glasgow Scientific Services
(GSS) for the provision of laboratory services, including the microbiological
examination and the analysis of foodstuffs and feed. The Council requires to make
statutory appointments for specialist support services and this plan seeks approval of
Glasgow Scientific Services and named staff to meet the requirements for a public
analyst, food examiner and agricultural analyst. These appointments are detailed in
Appendix II of this plan. 
2.5 Professional Support Network   
The service works closely with Food Standards Scotland, the Scottish Food
Enforcement Liaison Committee, the Crown Office (Procurators Fiscal) and NHS
Highland.   The service benefits from the support of the Royal Environmental Health
Institute of Scotland, the Society of Chief Officers of Environmental Health in
Scotland, The Lead Officer is an elected fellow and a registered food safety principal
at the Institute of Food Science and Technology and benefits from that network.   
The service values and participates as is appropriate and relevant to do so, within
established inter-authority liaison and professional network mechanisms operating
within Environmental Health in Scotland. Of specific note are Society of Chief
Officers of Environmental Health in Scotland), SFELC, the SFELC Approved
Establishments Working Group, the SFELC/SOCOEHS Methods and Techniques
Working Group, the SFELC Listeria Working Group, and the NHS Highland Liaison
Group. 
Page 160

Page 161

P a g e | 5  FOOD SERVICE PLAN 2023-25 FINAL 091023 
2.6 Food Control in Argyll and Bute   
The nature, type and scale of food businesses in Argyll and Bute are influenced by
its geography, particularly its proximity to the sea and infrastructure. These factors
can create a range of difficulties in delivering the statutory work. Examples of these
are:   
 An atypically high number of 55 approved (exporters) and 45 other
manufacturing and processing FBOs are engaged in manufacturing, often
utilising specialist processing techniques and technology without in house
technical support. This generates a high number of Home Authority requests
for assistance, advice and export certification. A significant supply sector
including a large seafood industry comprising the largest wild caught shellfish
sector in the UK and the second largest aquaculture sector in the UK. This
has a significant impact on the work of the service and requires specialist
shellfish waters classification work, which enforces the monitoring
programmes for bio-toxins and classification of shellfish harvesting waters. 
 The geography of Argyll and Bute poses specific challenges in delivering
services and ensuring that there are sufficient arrangements in place to
ensure and promote effectiveness and consistency. This is supported by the
direction of operational work and management direction of staff within the
decentralised area offices, training, specialist support, and the food plan 
 There is significant officer time spent travelling as part of their operational
work (estimated at 20%). This has reduced slightly in the past few years due
to flexible, mobile and remote working, through integrating roles where
possible and practical with other officers, our new Official Controls systems,
and better use of digital technology. This includes the ability to carry out
remote verification inspections via MS Teams and similar platforms. 
 Following the last FSS Audit, Root Cause analysis was applied to the findings
and determined that the state of compliance was due to insufficient
resources, responsibility allocation and management capacity. These issues
remain as issue with a resource gap of 5 FTE between the existing
establishment and that required to deliver the Food Law Code of Practice. 
 The re-start of Food Control following the pandemic, acknowledged the
unique and challenging circumstances of the Service. The options were
finally balanced between establishing a specialist team with the advantages
that provides and involving all Officers with the potential resilience that
provides. Previous experience with wider involvement which had been
attempted twice was not supportive. A focussed working group with all
Officers being trained in Advanced HACCP in Manufacturing and in OCV and
in OCV-Lite was implemented. The wider team now constitute a pool of
Officers which can assist the Working Group and can more quickly move into
the Group if required. The twin goals of specialism and resilience have now
been met. However, the Working Group is comprised of relatively
inexperienced Officers who have only completed only one pilot OCV
inspection cycle. Significant support and resourcing will be required, as there
is a resource gap of 5 FTE authorised food control officers between the
current establishment and that required to deliver the FLCOP. Actions to
address this challenges is detailed in the plan.   
Page 161

Page 162

P a g e | 6  FOOD SERVICE PLAN 2023-25 FINAL 091023 
2.7 Uniqueness of Argyll and Bute Council as a “food authority”   
2.7.1 The Service has responsibility for 2500 FBOs excluding the businesses which
operate on a temporary or ad-hoc basis. The FBOs are divided into risk rated
categories according to the Food Law Rating Scheme (FLRS) as follows:   
Category Minimum Inspection
Frequencies
Number of
Establishments  
Group 01  Risk Band A Every 18 months 17  
Group 01  Risk Band B Every 12 months 65 (includes 57
Approved premises)  
Group 01  Risk Band C Every 6 months 1  
Group 1 unrated  17  
Group 02  Risk Band A Every 24 months 134  
Group 02  Risk Band B Every 18 months 406  
Group 02  Risk Band C Every 12 months 152  
Group 02  Risk Band D Every 3 months 14  
Group 02  Risk Band E Every 1 month 2  
Group 2 Unrated  276  
Group 03  Risk Band A Every 60 months 592  
Group 03  Risk Band B Every 36 months 574  
Group 03  Risk Band C Every 24 months 50  
Group 03  Risk Band D Every 3 months 1  
Group 03 Unrated   262   
2.7.2 The 55 approved establishments (smokeries, shellfish processers, harvesters and
cheesemakers etc.) amounts to the third highest number in Scotland. These FBOs
fall within the ambit of Official Control Verification (OCV) and accordingly require the
resources according to the OCV resource calculation. The 45 further manufacturers
are not subject to approval because they do not process products of animal origin or
they process composite products containing products of animal origin, including
sandwich manufacturers, ready meal manufacturers, non-dairy cheese
manufacturers, a significant distilling sector and a brewing sector. A significant
proportion of the Approved and manufacturing FBOs minimally process their
products and utilise specialist ‘Hurdle Technology’, which places specialist demands
upon the Service. Manufacturing establishments in general also embody increased
political risks for the Council and commercial risks and opportunities for the local
economy, in that they distribute high risk products throughout the UK and globally.   
2.7.3 The Service has participated in the national awards relating to the Food Hygiene
Information Scheme and the EatSafe Awards which are run by the Food Standards
Scotland. Both recognise good businesses in terms of food safety and provide
information to allow the consumer to make an informed choice. The Service will
continue to participate insofar as limited resources will allow. Argyll and Bute, have
issued 114 Eat Safe awards out of a total of 1176 in Scotland.   
3. SERVICE PLANNING PROCESS   
3.1 Service Plan   
The Food Control Law Enforcement Service Plan (i.e. this plan) is submitted to the
Planning, Protective Services and Licensing Committee for approval. The plan
proposes a level of service and scope of work in relation to resources available in the
context of the statutory obligations placed on the Council. This plan does not meet in
full the FLCOP but focuses on higher risk priorities 
Page 162

Page 163

P a g e | 7  FOOD SERVICE PLAN 2023-25 FINAL 091023 
3.1.1 Resources, Demands and Risks   
Fundamental to Service planning is establishing the relationship between resources,
demands and risks and producing a plan that achieves the most optimal
reconciliation of these factors. This plan acknowledges a significant resource deficit
and is underpinned by risk assessment to provide the most effective application of
resources.   
The OCV Resource calculation in combination with the SFELC Food Control
Calculation in 2022 identified that the service required 17.94 FTE Food dedicated
Officers to deal with the full suite of statutory duties including backlogs and after
these backlogs have been addressed requires 11.22 FTE Food Control dedicated
Officers. Regulatory Services currently employ approximately 4.6 FTE in the
Manufacturing Working Group and 7.35 FTE will be applied to food control overall
with the addition of this plan, although 0.7 FTE is presently vacant.  Accordingly,
there is a significant resource deficit even when the current structure is fully staffed. 
The Service requires 5 FTE to deliver manufacturing OCs by dedicated food officers
and is not able to provide this.  Note the figure of 5 excludes food standards because
currently there is no OCV basis for quantifying that demand.  Currently there are 8
vacancies within the existing structure, including 1.6 FTE long term ill-health
absence.   
Accordingly, the Service has and will continue to apply a risk and intelligence-based
approach focussing resources upon areas of highest risk, including high risk FBOs.
Priority will be given to OCV in manufacturing, supply to vulnerable groups
enforcement, investigations and responding to incidents.   
This approach to managing risk through the most effective targeting of available
resources is wholly appropriate in the circumstances, although there is a significant
risk that Food Standards Scotland are likely, through formal audit, to raise another
major non-conformance confirming that the Council does not have sufficient
resources to deliver the full range of statutory requirements of food control. This can
lead to a direction from the Minister that the Council acquires the requisite resources.   
An example of the significant resource issues within the Service occurred in the
recent past where 6 vacancies occurred, including 3 officers who were authorised to
specifically deal with the high risk approved sector. Whilst the Service responded to
this situation appropriately, operational activities took priority and there was little
capacity to undertake “management” related activities including review of policies,
and internal monitoring. This demonstrates the challenges facing the service. This is 
exacerbated by the national shortage of environmental health officers and food
safety officers and this matter is being discussed nationally and reflects the SAFER
approach being taken in Scotland     
3.2 Review   
This plan will operate over a 2-year period from 2023-2025 with an annual
management review and regular performance reporting to the appropriate
Committee. 
Page 163

Page 164

P a g e | 8  FOOD SERVICE PLAN 2023-25 FINAL 091023 
4. SERVICE REVIEW – Summarising the Pandemic Period and Project New Start   
4.1 Summary Food Service Plan Review   
The principal achievements through the Pandemic and the Restart of Food Control
have been: 
1. The redeployment of Officers to address the Public Health emergency of the
pandemic in accordance with Scottish Government priorities which led to the
cessation of many Food Control activities. 
2. The Service provided support to the food manufacturing sector and its
personnel by taking a proactive and innovative approach to COVID-19 control
in Food Manufacture which continued to operate during the pandemic and
potentially constituted a vector and threat to wider society. Extensive support
was provided to food businesses during the Covid restrictions to ensure that
could trade safely and to assess changes to food safety management
arrangements which were necessary to comply with restrictions (e.g.
takeaway shops, wet sales premises providing some catering etc.). The
Service worked with the University of Lincoln National Centre for Food
Manufacture and both developed guidance and presented an online seminar
to some 440 FBOs included all the Approved establishments and other major
manufactures located in Argyll. This was very well received. The Service
afterward continued to provide bespoke support within Argyll. 
3. The Service was very actively engaged in the EU Exit transition to new export
arrangements and systems. Leading up to the transition and afterwards the
Service provide intense support for exporting FBOs and has also undertaken
the following:- 
 Established an automated quarterly system for application and issuing
Export Attestations. 
 Issued all EHCs requested on time amounting to 587 in the financial
year 2022-2023 
 Authorised Officers have been supported to qualify on the
DEFRA/APHA register for signing EHC 
 Established systems for providing EHCS for exports to China 
4. All Authorised Officers have been qualified in Advanced HACCP in Food
Manufacturing and in ‘OCV-Lite ‘for Catering and retail. All authorised Officers
except two have been qualified in OCV.      
5. During an application of for Approval to manufacture Biltong the Service
confirmed that the biltong process was not validated which led to a great deal
of research and work in order to produce a process that led to greater than 5-
Log reduction in contaminating bacteria. This led to a Scotland wide review of
standards for Biltong. 
6. The Lead Officer led a SFELC Working Group with the purpose of producing
a system of quantifying the resources that a Service requires to provide all
the statutory requirements for Food Control. This was adopted nationally and
has been operationalised in EXCEL. This has clearly confirmed a significant
deficit of resources at the Service and Scotland-wide.    
Page 164

Page 165

P a g e | 9  FOOD SERVICE PLAN 2023-25 FINAL 091023  
7. Restarted our food control arrangements focusing on the approved FBOs
sector and FBOs where intelligence suggested they had deteriorated to
Category B (former Annex 5) or worse during the pandemic. These FBOs
were inspected, and the appropriate interventions were taken.  The service
continued to respond to suspected or confirmed cases of food-borne disease,
complaints relating to food businesses and to the formal food alerts issued by
Food Standards Scotland.      
8. The Service achieved statutory compliance and protected food safety in
accordance with our enforcement policy which seeks to work with business to
secure compliance , and to initiate formal action where there are imminent
risks to food safety ,major or repeated non-compliance or non- cooperation.     
4.2 There has also been unplanned or reactive work which we have had to respond to,
and in some cases, this redeploys resources from our planned activities. These tend
to be high priority as they may relate to national alerts; the need for formal
enforcement action and are necessary to protect food safety and public health. An
example of this work is a national trade withdrawal of fish pate and responding to two
Food Alerts for Action involving non-compliant kebab meat.   
4.3 The Service was unable to deliver in full the food control restart due to resourcing
pressures created by 6 FTE vacancies across the environmental health team. As a
result, a range of actions were taken to manage resources across the whole of the
environmental health service which included a demand reduction exercise for all
environmental health service requests. This was aimed at redirecting resources to
higher risk activities. In respect of food control, the decision was taken to initially
focus on the high risk approved and food manufacturing sector, new business, and a
contractor was employed to carry out general FBO OCs to targeted food businesses.
These challenges continue.    
5. SERVICE PRIORITIES AND WORKPLAN 2023-2025   
5.1 The overarching Regulatory Services Service plan 2023-25 stated the food control
priorities as 
- To secure Committee approval for our Food Control Law Enforcement
Workplan for 2023-2025 (this plan) and implement measures to deliver it. 
- Continue to work with Food Standards Scotland on the review of the
approach to Food Control following the pandemic.  The Service is also
engaged in an emergent national Scottish SAFER project to redesign the
approach to Food Control applying limited resources to maximum effect and
in the longer term to provide assurance in public health protection, with
sufficient and sustainable resources to deliver the required work. 
- Review demand from export food business for export health certification and
attestations to identify resourcing requirements and the financial implications
from new business trading models which are focussing on commercial hubs
established post EU Exit.   
5.2 This service plan details the planned activities and priorities for 2023-2025. These
acknowledge the Services resource deficit, the advent of OCV and FLRS and
anticipate the FSS’s forthcoming SAFER programme. Key themes are Risk Focus,
planned proactive work, the use of intelligence OCV, FLRS and innovation intended
to optimise the effectiveness of Food Control, using scientific methods techniques
and modern technology. These are elaborated below: 
Page 165

Page 166

P a g e | 10  FOOD SERVICE PLAN 2023-25 FINAL 091023 
5.2.1 Inspection Programme   
- Recognising the Service’s resource deficit, the key Public Health and
consumer protection priorities of the manufacturing sector and its supply
chains, together with the political, economic/trade, export, reputational and
employment risks of this sector and also informed by and anticipating the
FSS SAFER programme, the inspection programme shall be operated
according to a framework which segments FBOs into three risk categories
i.e., low risk, medium risk and high risk. Within this framework Food Control
will be provided according to different approaches. References is made to
Figure one below. 
Figure One: - Categorisation of the Food Sector and its Food Businesses Operators according to Risk and
Intelligence 
FBOs will be placed into three risk categories and provided with OCs as follows:- 
 High Risk:  A planned and scheduled programme consisting of OCV
inspection cycles shall be applied to these FBOs. The performance target is
that all FBOs will be verified according to OCV with a minimum scope of
verification of all Critical Control Points and Operational Prerequisite
Programmes (OPPs) and a minimum time application of 80% of the resource
calculation according to the SFELC Guidance on OCV within each Inspection
cycle to be scheduled over one fiscal year. The Lead Officer will provide
professional, enforcement and technical support. 
 Medium Risk: -Intelligence – led interventions shall be performed reactively
which may, depending on the outcome, result in the transfer the FBO into the
High-Risk category. The intervention, which shall be an OCV inspection, will
Page 166

Page 167

P a g e | 11  FOOD SERVICE PLAN 2023-25 FINAL 091023
inform enforcement activity sufficient to restore food safety, consumer
protection and legal compliance 
 Low Risk: Interventions will be carried out, where appropriate, reactively
according to intelligence provided by sources (e.g. police, public, FSS) 
 Statistical sample: - A statistically representative sample of high and
medium risk catering and retailing FBOs will be selected for an OCV
inspection. The results will inform the Service about the state of compliance
of all FBOs within predetermined levels of confidence. This will be reviewed
on an annual basis, and the inspection programme adjusted accordingly      
The High-Risk FBOs will be verified by the Manufacturing OCs Working Group with
a target of 4.6 FTE resources to be allocated to this priority area, according to the
OCV resource calculation.  The Working Group is chaired and led by the Lead
Officer who shall also support the work of the group with responsibility for delivering
the program 
 Status - the second Inspection Cycle began on the 1 April 2023.
 Status – the food intervention plan is ongoing and resources will be
allocated to deliver the revised program 
5.2.2. Listeria Programme   
The service is cognizant of the changes in the FSS and FSA risks assessment of
Listeria monocytogenes in cold smoked fish and fish products, together with Health
Protection Scotland’s position that the current outbreak of Listeria monocytogenes is
due to the vector of imported fish.   
Accordingly, the Service will review the OCV inspection cycles to ensure that Control
Measures for Listeria are effective and the verification of them is also effective.   
 Status - Underway.  Verification of fish suppliers is scheduled by 30
September 2023. The verification of the remaining Control
Measures will be completed by the end of the Inspection cycle i.e.
31 March 2024 
5.2.3 Validation of Unpasteurised Cheese Programme. 
The service is cognizant of the potential for the unpasteurised cheese process to be
invalidated at the Isle of Cheese Company, albeit the FBO and the Specialist
Cheese Makers Association are adamant that it is validated. As part of the
inspection cycle the Service will verify the position on Validation.   
 Status - Inspection cycle began on the 1 September 2023. 
5.2.4  Review of Authorisation 
The Service will review the Authorisations of all Authorised Officers according to
retained (EC) and (EU) Food Law.   
 Status - Target 30 December 2023. 
5.2.5  Schools and Hospitals Food Supply 
Page 167

Page 168

P a g e | 12  FOOD SERVICE PLAN 2023-25 FINAL 091023  
In addition to the Inspection Programme outlined above, the Service will provide a
further programme of Official Controls consisting of two elements (i) A programme of
scheduled inspections (‘OCV-Lite’) aimed at Argyll’s schools and hospitals and (ii)
The Lead Officer assessing the Councils Commercial Services Food Safety
Management System and providing support to the schools, the hospitals and for the
Inspecting Officers. 
 Status - Inspection beginning 15 January 2024. 
5.2.6  Scheme of Charging for Non-Compliance 
The Service will consider the ability to develop a scheme of charging for non-
compliance based upon retained EU Food Law in order that compliance is
incentivised and to introduce a fee for enforcement   
 Status – Target 30 June 2024. 
5.2.7  CPD/Training 
The Service will support officers achieving a minimum of 10 hours of CPD in Food
Control to all Authorised Officers. 
Further specific CPD will be provide as follows: - 
REHIS/SEAFISH joint award in the Verification of Bivalve Processing
establishments.       
 Status – Target 1 March 2024 
5.2.8  Support for the Higher Certificate in Food Standards Inspections 
Pursuing FLRS the Service will support two Officers who are actively pursuing the
REHIS Higher Certificate in Food Standards premises Inspection       
 Status - Underway. Target 30 April 2024. 
5.2.9 Sampling Plan 
The Service has developed a sampling plan focussing upon supporting OCV for
verification of FCMSs in high-risk manufacturing FBOs which is cognisant of the
FSS/FSA risk assessment of Listeria monocytogenes. 
 Status – Started - to be completed by 31 March 2024. 
5.2.10 Exports and Attestations 
The Service will continue to issue all export health certificates and attestations
based upon verified legal compliance of FBOs where the requests have been made
with a minimum of 48 hours of working day notice. This is subject to the exigencies
of service.       
 Status – Underway and ongoing 
5.2.11  Innovation – Scientific Methods and Techniques 
Page 168

Page 169

P a g e | 13  FOOD SERVICE PLAN 2023-25 FINAL 091023  
The Service is committed to the review of current Methods and Techniques and
further innovation with the purpose of optimising the effectiveness of Food Control,
recognising that a resource deficit demands existing resources are used to
maximum effect. The Service will work within the SFELC/SOCEHS ‘Methods and
Techniques’ Working Group and within the FSS’s SAFER programme.       
 Status –Ongoing and to be completed 30 June 2024. 
5.2.12 Innovation – Remote Delivery Food Control 
The Service will work with the Council’s IT department to operationalise the
appropriate parts of OCV for remote delivery with the intention of reducing the 20%
of FTE that currently has to be devoted to travelling. This time will be recycled back
into Food Control.       
 Status – Target 31 March 2024. 
5.2.13 Innovation – Digital Processing of Documents 
The Service aims to migrate from paper to electronic case records for the receipt
and management of documentation required for Food Control.       
 Status – Target 31 March 2024. 
5.2.14 Innovation – Application of OCV to Catering and Retail FBOs and Improved
Quality Control over the use of Contactors 
The Service will develop an OCV approach suitable for catering and retailing FBOs
and to support the effectiveness and the consistency of the inspection programme
and to enhance the monitoring and the quality control over the use of external
contractors.       
 Status – Target 31 March 2024. 
5.2.15 Innovation – The Use of OCV for Food Authenticity and Integrity/ 
Food Fraud/ Crime 
Pursuing OCV and FLRS the Service will consider contracting with SEAFISH to
provide the REHIS/SEAFISH joint award in the Verification of Food Authenticity and
Integrity and operationalise the appropriate Methods and Techniques.       
 Status – Underway.  Target 31 March 2024. 
5.2.16  Internal Monitoring 
A phased return to internal monitoring consistent with operational demands and
available resources.       
 Target Formal Notices – 15 November 2023
 Verification of one inspection per Officer 31 March 2024.
 Extend internal monitoring and develop 24/25 plan 31 March 2025 
 
Page 169

Page 170

P a g e | 14  FOOD SERVICE PLAN 2023-25 FINAL 091023 
5.2.17 Service redesign and review food safety delivery arrangements 
A service redesign will review the food control delivery arrangements and lead
officer arrangements 
 Status – 31 March 2024 
5.3 Reactive work arising from a range of sources and may include communicable
disease and food related illness, significant enforcement activity; national and local;
food withdrawals and emerging issues. These reactive demands, along with
planned and proactive work, will be risk assessed. Resources will be allocated in
accordance with the risk assessment outcomes. 
5.4 The longer-term horizon remains currently unclear, pending a number of significant
developments, including the resource deficit within a picture of a severe national
resource deficit, the advent of SAFER, the expansion of OCV, the implementation
of a further revision of the Food Law Code of Practice, and the developing food
crime agenda.   
5.5 Other Service Issues   
The Service will continue to:   
1. Work in partnership with NHS Highland in the investigation of reports of food
communicable disease, and more specifically food-borne illness.      
2. Focus our sampling activity on high-risk locally produced goods.      
3. Work with partners including other local authorities, the business sector and
Food Standards Scotland.      
4. Provide for an effective and appropriate response to Food Alerts and Food
incidents as required and issued by Food Standards Scotland where all
alerts are considered immediately, and appropriate action is taken.    
6. RESOURCES   
6.1 There is no separate food control budget and costs are included within the wider
environmental health budget. Estimated costs for food control are detailed below for
2023/24.   
FOOD
Employee costs £405,000
Training & Resource Materials 2000
Transport & Carriage Costs Included in laboratory costs
IT & communications 1,000
Laboratory costs 15000
Total £423,000 
Page 170

Page 171

P a g e | 15  FOOD SERVICE PLAN 2023-25 FINAL 091023 
6.2  Staffing Allocation   
All Enforcement Officers hold the qualifications described in the Food Safety Codes
of Practice for Food Safety and Food Standards under the Council’s Scheme of
Delegation. The Service has an established procedure for the Authorisation of
Enforcement Officers and Appendix II details the specific authorisations for Officers. 
These fall to be reviewed on a regular basis and may change in the course of the
period of the Service Plan.   
Approved Regulatory Services & Building Standards Manager 
Endorsed by Council PPSL Committee 
Regulatory Services & Building Standards Manager, October 2023 
Page 171

Page 172

P a g e | 16  FOOD SERVICE PLAN 2023-25 FINAL 091023 
APPENDIX I 
REGULATORY SERVICES
SERVICE CONTACT ARRANGEMENTS 
Contact Arrangements and Details 
Regulatory Services operate the Councils hybrid working model with staff working at home, in the
office, remotely and on site depending on roles and responsibilities. Accordingly, the service cannot
ensure that officers will be available at Council offices unless specific appointments are made in
advance. Service requests and other access to the Service can be initiated by telephone, e-mail or
in person via Customer Service Centres. 
Regulatory Services can be contacted by telephone on 01546 605519 
by email. envhealth@argyll-bute.gov.uk 
Advice and information is available through the Council website www.argyll-bute.gov.uk 
Where a face to face meeting is required , this will be arranged on site, at the following Council
Offices or other suitable locations 
Offices where staff are based: 
EAST Argyll House, Alexandra Parade, Dunoon PA23 8AJ  
Civic Centre, 38 East Clyde Street, Helensburgh G84 7PG   
WEST Municipal Buildings, Albany Street, Oban PA34 4AW  
Kilmory, Lochgilphead PA31 8RT 
Regulatory Services management can be contacted at Kilmory, Lochgilphead, PA31 8RT,
telephone 01546 605519 
Advice and information on Regulatory Services is published on the Council’s website www.argyll-
bute.gov.uk. 
Page 172

Page 173

P a g e | 17  FOOD SERVICE PLAN 2023-25 FINAL 091023
APPENDIX II 
FORMAL AUTHORISATIONS AND APPOINTMENTS 
PUBLIC ANALYST, FOOD EXAMINERS, AGRICULTURAL ANALYSTS 
Public Analysts 
In terms of the Food Safety (Sampling and Qualifications) (Scotland) Regulations 2013, the following staff
members hold the Mastership in Chemical Analysis qualifications awarded by the Royal Society of Chemistry
and are eligible for appointment as Public Analysts: 
Gary Walker  Divisional Manager, Head of Community Safety and Regulatory Services
Jane White  Group Manager, Scientific Services 
Food Examiners 
In terms of the Food Safety (Sampling and Qualifications) (Scotland) Regulations 2013, the following staff
members hold academic qualifications listed in Part 1 of Schedule 2 and have attained the minimum three
year experience requirement in the laboratory listed in Part II of the Schedule: 
Gary Walker  Divisional Manager, Head of Community Safety and Regulatory Services
Jane White  Group Manager, Scientific Services
Dawn Neeson  Microbiologist
Alison Aitken  Microbiologist 
Agricultural Analyst 
Under the terms of the Fertilisers (Sampling and Analysis) Regulations 1996, the following staff members,
holding the Mastership in Chemical Analysis awarded by the Royal Society of Chemistry and whose practical
experience as Agricultural Analyst, have been attested, are eligible for appointment as Agricultural Analyst
and Deputy Agricultural Analyst. 
Gary Walker  (Agricultural Analyst) Scientific Services Manager
Jane White  (Deputy Agricultural Analyst) Public Analyst 
Under the terms of the Feed (Sampling and Analysis and Specified Undesirable Substances) (Scotland)
Regulations 2010, the following staff members, holding the Mastership in Chemical Analysis awarded by the
Royal Society of Chemistry and whose practical experience as Agricultural Analyst, has been attested, are
eligible for appointment as Agricultural Analyst or Deputy Agricultural Analyst. 
Gary Walker  (Deputy Agricultural Analyst) Scientific Services Manager
Jane White  (Deputy Agricultural Analyst) Public Analyst 
Food Standards Scotland are now the competent authority for feed and as such have appointed the above
individuals as Deputy Agricultural Analysts for Feed.  Duncan Campbell from Aberdeen Scientific Services is
the Agricultural Analyst for feed. 
Approved Signatories 
Under the laboratory UKAS quality system the following staff members through qualification and experience
are documented authorised signatories for specific sample types: 
Gary Walker  Divisional Manager, Head of Community Safety and Regulatory Services
Jane White  Group Manager, Scientific Services 
Jack Stoddart  Depute Group Manager, Scientific Services
Barbara Kraszewski Chemist
David Arthur  Team Leader
Richard Aitken  Team Leader
Karen Macvicar Chemist
Page 173

Page 174

P a g e | 18  FOOD SERVICE PLAN 2023-25 FINAL 091023 
In terms of the Food Safety (Sampling and Qualifications) (Scotland) Regulations 2013, the following staff
members hold the Mastership in Chemical Analysis qualification awarded by the Royal Society of Chemistry
and are eligible for appointment as Public Analysts: 
Gary Walker  Divisional Manager, Head of Community Safety and Regulatory Services
Jane White  Group Manager, Scientific Services 
Official Control Laboratory Recognition 
The laboratory has been appointed as an official food control laboratory in the UK for both chemical analysis
and microbiological examination.  This can be confirmed by visiting the web site:
https://www.foodstandards.gov.scot/business-and-industry/local-authorities-gateway/official-feed-and-food-
laboratories 
Page 174

Page 175

P a g e | 19  FOOD SERVICE PLAN 2023-25 FINAL 091023
APPENDIX III 
ARGYLL AND BUTE COUNCILS AUTHORISED OFFICERS UNDER FOOD SAFETY ACT 1990 
The following Officers are appointed under the Food Hygiene (Scotland) Regulations 2006 in accordance with Regulation (EU) 2017/625 of the
European Parliament and of the Council for the purposes of Community Legislation and retained EC and EU Food Regulations, are
appointed under the Food Safety Act 1990 as “authorised food officer”. Their powers of authorisation vary depending upon qualifications,
experience, post and competency. The undernoted details the specific authorisation levels for Authorised Officers. 
Food Hygiene and Food Standards 
Powers  
Visit, 
access and
inspection   Sampling Seizure and
detention
Service of
Improvement
Notice 
Service of
Temporary
Closure Notice
Service of
Remedial
Action Notice
Approval of
Businesses
Regulation
(EC) 853/2004    
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Alan Morrison
Regulatory
Services and
Building
Standards 
Manager √ √ √ √       N/A  
Andy MacLeod
Lead Officer
Food Control √ √ √ √ √ √ √  √ √ √ √  √ √
Jo Rains
Environmental
Health Officer √ √ √ √ √ √ √
√
√ √ √   
Andy
McClements
Environmental
Health Officer  √ √ √ √ √ √ √
√
√ √ √  √ 
Richard Gorman
Environmental
Health Officer √ √ √ √ √ √ √  √ √ √   
Jacqui Middleton
Environmental
Health
Manager
(West) √ √ √ √         
Page 175

Page 176

P a g e | 20  FOOD SERVICE PLAN 2023-25 FINAL 091023 
Powers  
Visit, 
access and
inspection   Sampling Seizure and
detention
Service of
Hygiene/
Improvement/
Food
Standards
Notices
Service of
Temporary
Closure Notice
Service of
Remedial
Action Notice
Service of
Emergency
Prohibition
Notice    
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Adrian Rowe
Regulatory
Services
Officer √ √ √ √ √ √ √  √ √ √ √ √  N/A
Marcillena
MacCuish
Regulatory
Services
Officer √ √ √   √ √ √   √       
Mary Watt
Environmental
Health
Manager
(East)  √ √ √ √ √ √ √ √ √  √   
Patrick Mackie
Environmental
Health Officer √ √ √ √          
Nicole Hamilton
Environmental
Health Officer √ √ √ √ √ √ √ √ √ √ √   
Cameron
McAuley
Environmental
Health Officer √ √ √ √ √ √ √ √ √ √ √   
Sue Stefek
Environmental
Health Officer  √  √  √  √  √  √  √  √  √   √     
Pauline Varley
Environmental
Health Officer √ √ √ √ √ √ √  √  √  √ 
Mark Parry
Environmental
Health Officer  √  √  √  √  √  √  √  √       
Page 176

Page 177

P a g e | 21  FOOD SERVICE PLAN 2023-25 FINAL 091023
Powers  
Visit, 
access and
inspection   Sampling Seizure and
detention
Service of
Hygiene/
Improvement/
Food
Standards
Notices
Service of
Temporary
Closure Notice
Service of
Remedial
Action Notice
Service of
Emergency
Prohibition
Notice    
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Hygiene
Standards
Ian Campbell
Regulatory
Services
Officer √ √ √ √          
Katie McNair
Technical
Officer  √ √ √ √          
Gemma Rae
Technical
Officer √ √ √ √          
Karen Goodchild
Technical
Officer √ √ √ √          
David Kerr
Senior Animal
Health and
Welfare Officer √ √ √ √          
Graeme Pirie
Animal Health
and Welfare
Officer √ √ √ √          
Jacklyn Sinclair
EH
Enforcement
Officer √ √ √ √           
Page 177

Page 178

This page is intentionally left blank

Page 179

Argyll and Bute Council 
Development and Economic Growth 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE – 18th October
2023
UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL DECISION
_________________________________________________________________________
A) INTRODUCTION 
This report summarises the outcome of a recent appeal decision by The Planning and
Environmental Appeals Division (DPEA) relative to the case set out below. 
B) RECOMMENDATION 
Members are asked to note the contents of the report. 
C) DETAILS OF APPEAL DECISIONS 
Planning Authority: Argyll and Bute Council 
Planning application ref:  21/02709/PP
Planning appeal ref: PPA-130-2086 (Planning Permission Appeal) 
Proposal: Variation Of Condition Numbers 3, 4, 5 And 6 And Removal Of Conditions 7 And 8
Relative To Planning Permission 20/01150/PP (Erection Of Dwellinghouse) Access
Arrangements 
Location:  Rhu Lodge, Ferry Road, Rhu, Helensburgh, G84 8NF
Date of decision: 05 Sept 2023 (Appeal Allowed)
This application was approved by the Council on 22nd March 2023. An appeal was
subsequently submitted to the Department of Environmental and Planning Appeals (DPEA).
The Reporter assessed the application in accordance with section 25 of the Town and Country
Planning Act (as amended) which requires development to be in accordance with the Local
Development Plan unless material considerations indicate otherwise. 
The Reporters Decision Notice concludes: “In conclusion, I find that conditions 3, 4, 5, 6, 7
and 8 attached to planning permission 21/02709/PP fail to meet the tests of necessity and
reasonableness, as set out Circular 4/1998. The appellant has demonstrated to my
satisfaction that it is neither necessary nor reasonable to require Ferry Road to be improved
to an adoptable standard given the location, nature and scale of the development proposed;
it is a lightly-trafficked private road within a conservation area. There is no evidence to suggest
that the council has undertaken an assessment of use to justify the package of improvement
measures to Ferry Road that it seeks. In the absence of such, I consider the improvements
proposed by the appellant are proportionate and would ensure that Ferry Road continues to
function safely and effectively. Furthermore, the appeal site’s location within Rhu Conservation
Area requires decision makers to take full account of the area’s special interest and ensure
that new development preserves or enhances its character or appearance. The council’s rigid
application of standards in its pursuit of infrastructure to serve the proposed dwelling house
suggests that it has failed to consider the qualities of the place before the movement of
vehicles; contrary to policies set out in Designing Streets and the LDP. Accordingly, I find that
conditions 3, 4, 5, 6, 7 and 8 should be varied or removed as described above and as set out
in the schedule of conditions attached to this notice below.”
Page 179 Agenda Item 9

Page 180

Full details of the appeal decision can be viewed on the DPEA website: 
Scottish Government - DPEA - Case Details (scotland.gov.uk)
A copy of the Decision Notice is attached at Appendix A.
D) IMPLICATIONS 
Policy: None. 
Financial: None. Personnel: None 
Equal Opportunities: None 
Author and Contact Officer: Kirsty Sweeney 01436 657665
Fergus Murray 
Head of Development and Economic Growth 
APPENDIX A: DPEA DECISION NOTICE 
Page 180

Page 181

Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
E: dpea@gov.scot                                     T: 0300 244 6668
Appeal Decision Notice

Decision
I allow the appeal and grant planning permission for the erection of a dwelling house at Rhu
Lodge, Ferry Road, Rhu, Helensburgh, G84 8NF, in accordance with the application
reference 21/02709/PP made on 21 December 2021, without compliance to conditions
numbered 3, 4, 5, 6, 7 and 8, previously imposed on application reference 20/01150/PP
made on 2 July 2020, but subject to other conditions imposed by that permission, so far as
these are still subsisting and capable of taking effect, and subject to the new conditions
listed at the end of this notice, namely condition numbers 3, 4 and 5.
Reasoning
1. I am required to determine this appeal in accordance with the development plan,
unless material considerations indicate otherwise. The development plan in this case
consists of the Fourth National Planning Framework (NPF4) and the Argyll and Bute Local
Development Plan 2015 (LDP).
2. The determining issue in this appeal is whether conditions 3, 4, 5, 6, 7 and 8
attached to planning permission 21/02709/PP meet the six tests of Circular 4/1998: The use
of conditions in planning permissions, which have been imposed ‘in the interests of road
safety’. I consider two of the six tests relevant, firstly, whether the road improvements are
necessary in order to mitigate the effects of the proposed development on the local road
network and, secondly, whether the conditions are reasonable in all other respects.
3. The appeal site lies within the Rhu Conservation Area. Accordingly, Section 64(1) of
the Listed Buildings And Conservation Areas (Scotland) Act 1997 requires that I pay special
attention to the desirability of preserving or enhancing the character or appearance of the
area. I consider these matters below.
Background
4. Planning permission for the erection of a dwelling house on the appeal site was first
granted on 18 November 2020, subject to nine conditions (20/01150/PP). An application
under Section 42 of the Town and Country Planning (Scotland) Act 1997, as amended,
subsequently sought to vary conditions 3, 4, 5 and 6 and remove conditions 7 and 8
Decision by Andrew A Sikes, a Reporter appointed by the Scottish Ministers
• Planning appeal reference: PPA-130-2086
• Site address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, G84 8NF
• Appeal by Mr Graham Wylie against the decision by Argyll and Bute Council
• Application for planning permission reference 21/02709/PP, dated 21 December 2021, to
carry out the development without compliance with conditions 3, 4, 5, 6, 7 and 8, imposed
on the grant of planning permission 20/01150/PP, dated 18 November 2020.
• The development proposed: erection of a dwelling house.
• Date of site visit by Reporter: 31 July 2023
Date of appeal decision: 5 September 2023
Appendix A
Page 181

Page 182

PPA-130-2086  2
attached to that consent (21/02709/PP). All of the conditions relate to road improvements
and access arrangements required to mitigate the effects of the proposed development on
the local road network. On 6 April 2023, however, the council granted planning permission
for the dwelling house subject to the same conditions, albeit with some minor changes. 
5. In summary, the six conditions seek: 
• the provision of a 3.5 metre road (to adoptable standards) between the appeal site
and A814 Gareloch Road (condition 3);
• the provision of sightline visibility splays of 2.4 x 25 x 1.05 metres at the site’s
driveway access with Ferry Road (condition 4);
• the construction of a private access that accords with council guidance
(conditions 5, 6 and 7); and,
• parking and turning provision within the curtilage of the proposed dwelling house
(condition 8). 
6. There is no dispute between the parties regarding the remaining three conditions,
namely; condition 1 (approved drawings), condition 2 (connection to public water supply)
and condition 9 (materials). With regard to condition 1, however, the council has indicated
that due to an administrative error an incorrect set of drawings were stamped ‘approved’
and issued to the applicant. I address this matter at the end of this notice, where I also
provide a revised list of approved drawings. 
7. Given the matters in dispute, I undertook an accompanied inspection of Ferry Road.
In addition to the appellant, I was joined by residents of Ferry Road and representatives of
the community council. At my request, the dimensions of the proposed road improvements
and traffic management measures had been marked on the ground. These matters are
addressed under the relevant condition headings below (as referred to on decision
notice 21/02709/PP). Before doing so, I briefly describe the appeal site and its
surroundings, including Ferry Road. 
The appeal site and its surroundings 
8. The appeal site lies within the grounds of Rhu Lodge, Ferry Road, Rhu, near
Helensburgh. Access to the appeal site is via Ferry Road, which provides pedestrian and
vehicular access to a number of properties. Approximately 60 metres from its junction with
the A814, the road divides to give access to a 30-bed hotel and five houses. Ferry Road
continues for a further 240 metres until it reaches an informal turning area, beyond which lie
a Ministry of Defence radar mast and Rhu Point. This part of Ferry Road provides access to
a further five houses, which use four different accesses. The access to the dwelling for
which planning permission has been granted would use one these accesses. 
9. High stone walls, mature trees and hedges bound Ferry Road to the north, whilst to
the south, beyond a grass verge, lies Rhu Bay and its shingle and sand beach. Together,
these features combine to create an attractive residential area worthy of its conservation
area status. 
10. Ferry Road is a well-maintained single-track traffic-calmed road with a number of
passing places and speed bumps. Beyond the access to the hotel, signs indicate that Ferry
Road is a private no-through road for use by residents and subject to a 10 mph speed limit.
A road marking reinforces the speed limit. 
Page 182

Page 183

PPA-130-2086  3
The principle of development 
11. Before addressing the matters in dispute, I agree with the parties that the erection of
a dwelling house on the appeal site is acceptable in principle. The site is located within the
settlement boundary of Rhu in which the policies of the LDP support in principle small-scale
development (5 dwellings or less). The scale of the proposed dwelling, its design and
choice of materials are also considered acceptable and in conformity with relevant LDP
policies and supplementary guidance. 
Condition 3 
12. Condition 3 requires the provision of a 3.5 metre wide road, constructed to adoptable
standards, between the appeal site and A814 Gareloch Road, including the provision of
passing places at a maximum of 100 metre spacing. The condition is the same as that
attached to the original (2020) planning permission. 
13. The appeal site and its surroundings enjoy a high level of amenity. Indeed, as a
conservation area, the LDP, supported by supplementary guidance, establishes a
presumption against development that does not preserve or enhance its character,
appearance or setting. In my consideration of this appeal, I have had regard to Designing
Streets, which states, good street design should derive from an intelligent response to
location, rather than a rigid application of standards. I have also had regard to the council’s
adopted supplementary guidance on transport matters, which similarly states, street design
for new development must consider place before movement. 
14. Although the council has considered the effects of the proposed development on the
character and appearance of the conservation area, its assessment, as set out in its
handling reports, focuses on the design of the dwelling house and effects on neighbouring
properties; there is no assessment of the effects that the required road improvements would
have on the character or appearance of the conservation area or its setting. Nor is there an
assessment of the wider use of Ferry Road to support the package of road improvements
sought; these are matters the council is content to leave to further assessment when
discharging conditions. The absence of such assessments as part of the overall
consideration of the application lends weight to the claim that insufficient thought has been
given to the wider effects of the proposed road improvements on the character and
appearance of the conservation area, its setting and wider residential amenity. 
15. With regard to development that intends to utilise an existing private access or a
private road, I note the terms of Policy SG LDP TRAN 4 and its reference to ‘commensurate
improvements’ that are ‘appropriate in scale and nature’ and ‘informed by an assessment of
usage’. The policy adds, private accesses should be constructed to incorporate minimum
standards to function safely and effectively in relation to adequate visibility splays, access
gradients, geometry, passing places, boundary definition and turning capacities, among
other things. 
16. In this case, despite the context described above, the road improvements sought by
the council are a ‘standard’ response to the predicted effects of the proposed development,
based on guidance set out in the National Roads Development Guide (2017) and the
council’s Roads Guidance for Developers (small housing developments) (2008). There is no
acknowledgement in the roads officer’s consultation responses, nor the report of handling,
to the scope that exists within the guidance to reduce or seek improvements commensurate
to the nature, scale and location of the proposed development. 
17. With regard to the issues of concern to the council, I am satisfied that a minimum 3.5
metre carriageway capable of providing access for emergency service vehicles can be
Page 183

Page 184

PPA-130-2086  4
provided from the appeal site to the A814; Designing Streets and National Roads
Development Guide advise that an access route can be reduced to 2.75 metres over a
short distance and at pinch points, respectively. Ferry Road adjacent to Rosslea West and
Tigh-na-mara is presently 2.75 metres wide and is capable of being widened to 3.5 metres
by incorporating a grass verge/gully into the running surface of the road. 
18. With regard to passing places, the National Roads Development Guide states, on
existing narrow rural roads, passing places should be constructed to enable user defined
traffic to pass, the design of which should consider functionality against a balanced view of
place-making aspirations and a presumption against urbanising the countryside. Within this
context, I am satisfied that with the addition of a passing place opposite the appeal site
entrance, there would be adequate opportunity for vehicles to pass safely. Importantly, the
existing and proposed passing places would achieve the required 100 metres forward
stopping sight distance (as shown on drawing no’s 22034_006 rev B). As demonstrated to
me on site, the proposed passing place satisfies the minimum overall width of 5.5 metres
and extends to the required 10 metres, plus 5 metre splays at each end. 
19. While the council highlights the informality of the ‘passing places’ immediately to the
west of Rosslea West and east of Tigh-na-mara, I note that their dimensions exceed the
‘typical passing place detail’ shown on drawing number SD 08/003 rev A. Furthermore, the
appellant’s photographs demonstrate that two vehicles can pass comfortably and safely at
each point. 
20. With regard to the Ferry Road/A814 junction, the council states that it is a junction
with a public road and not a passing place. Nonetheless, the appellant claims it functions
effectively as a passing place and has done so for a considerable amount of time without
any record of accidents; I observed the junction being used without difficulty at my site
inspection. While the appellant’s drawing number 19/20/R11 shows that there is sufficient
space for two vehicles to pass, the council’s standard detail requires a road width of 5.5
metres, not 4.5 metres as shown on the drawing. 
21. Notwithstanding the council’s comments, there is a relatively wide expanse of road in
front of The Lodge which in effect creates additional space to that shown on the drawing for
vehicles to pass safely. Alternatively, vehicles are able to join the A814 either side of a
small grass verge which divides the junction. As the junction lies on the outside bend of the
A814, there is good forward visibility for vehicles entering the A814 whether heading north
or south. Also, as shown on appellant’s drawing number 19/20/R1 A (existing passing
places), there is intervisibility between the junction and the divide in the road that serves the
hotel (also regarded by the council as an informal passing place), which are
approximately 60 metres apart. Taking account of these matters, and my findings with
regard to the improvements to Ferry Road in general, I consider that a relatively small
departure from the standard width of a passing place, albeit an informal passing place, is
acceptable given the emphasis of national and local policy to consider place before
movement, particularly so in light of the sites location within the Rhu Conservation Area. 
22. While Ferry Road has no formal turning head, there is space at the end of the road
immediately beyond the radar mast where vehicles can turn, as demonstrated by the
appellant’s supporting photographs and as I witnessed for myself. In any event, as noted by
the appellant, its application to the council sought to vary and remove conditions attached to
the original (2020) permission, which did not include any requirement for a turning head.
This matter is therefore beyond the scope of this appeal. 
23. Finally, the appellant questions the reasonableness of condition 3 given the costs
involved in upgrading the road to an adoptable standard to serve one additional dwelling;
the relocation of existing utility apparatus would add further cost. Although I have not been
Page 184

Page 185

PPA-130-2086  5
presented with detailed evidence on this matter, it is reasonable to assume that the costs
involved in bringing the road up to an adoptable standard would be significant, given the
distance between the appeal site and the A814 junction and the range of measures
indicated on drawing 19/20/R8 A. In this regard, Circular 4/1998 cautions against the
imposition of conditions which are unduly restrictive and would effectively nullify the benefits
of a permission. 
24. In summary, for the reasons that I set out above, I consider the requirements of
condition 3, as proposed by the council, are unnecessary and unreasonable. Whereas,
given the location, nature and scale of the proposed development, those proposed by the
appellant incorporate the minimum works necessary to allow Ferry Road to function safely
and effectively. Furthermore, I am satisfied that the proposed improvements can be secured
by the revised condition suggested by the appellant. 
Condition 4 
25. The matter in dispute relates to the vision splay measurements at the appeal site’s
driveway access with Ferry Road. The measurements set out in the condition are based on
advice contained in Designing Streets and Roads Guidance for Developers, the latter
states; the normal requirement is for an ‘x’ distance of 2.4 metres; a ‘y’ distance determined
by the speed of traffic on a public road (for example. 25 metres on a public road with a
speed limit of 20 mph); a vertical distance of 1.05 metres. The appellant considers that
there is scope to reduce the ‘x’ and ‘y’ values given the character of Ferry Road, the nature
of its use and its location within a conservation area. 
26. Taking these matters in turn, Designing Streets (page 34) states that a minimum ‘x’
value of 2 metres may be considered [appropriate] in some very lightly-trafficked and slow
speed situations. To this end, a number of the appellant’s drawings show a set-back of 2
metres. Others, however, show a set-back of 2.4 metres. Given the uncertainty, I asked the
appellant to confirm his position on this matter. In response, with reference to guidance set
out in Designing Streets and the site’s location in a conservation area, the appellant
strongly considers that an ‘x’ value of 2 metres is appropriate in this instance. The appellant
adds, an ‘x’ value of 2 metres would also result in less disturbance to existing stone walls
and reduce harm to the character and appearance of the conservation area. The council’s
position is that the ‘x’ value should remain 2.4 metres. 
27. While it is possible to achieve the sightline visibility splays at the driveway access to
Ferry Road sought by the council, the appellant correctly states that the measurements
quoted in the condition relate to junctions on a public road where the speed limit is 20 mph.
Ferry Road is a private road, and the appeal site access is not a junction; it is an existing
gated private driveway. Furthermore, Ferry Road is traffic-calmed (speed bumps) and
signposted as a 10 mph zone. 
28. With regard to the ‘y’ value, firstly, I note that the ‘y’ distance has been reduced to 25
metres from 42 metres to correct an error in the drafting of decision notice 20/01150/PP.
Secondly, given that it is not possible for vehicles to overtake on Ferry Road, the parties
agree that the ‘y’ value can be measured to the centreline of the road. Thirdly, as I note
above, I am satisfied that a ‘y’ value 25 metres can be achieved at the driveway access,
although this would necessitate a minor realignment of the high stone wall that bounds the
appeal site. Fourthly, while Designing Streets indicates that the ‘y’ distance may be reduced
further where there is a speed limit of 10 mph, the appellant’s proposed visibility splay
of 2 x 25 x 1.05 metres, as shown on drawing number 22034_006 rev B, seeks to balance
the council’s road safety concerns with effects on the character and appearance of the
Page 185

Page 186

PPA-130-2086  6
conservation area, notably by minimising alterations to the stone boundary wall and
avoiding any interference with existing mature trees. 
29. In conclusion on this matter, while condition 4 is necessary and reasonable in its
intent, I find that it should be varied to take account of a revised visibility splay. I am
satisfied that the appellants proposed condition 4 would secure and maintain a visibility
splay of 2 x 25 x 1.05 metres, as shown on drawing numbers 22034_006 rev B
and 19/20/R10 rev B. Also, I am satisfied that the proposed improvements would address
the road safety concerns of the council. 
Condition 5 
30. Condition 5 sets out the requirements for the construction of the private access to the
appeal site with reference to the council’s standards. While the council believes that the
condition should remain unchanged and attached to the planning permission, the appellant
believes that it is unnecessary. 
31. I have assessed the council’s standard detail for the creation of a private driveway, as
shown on drawing number SD 08/002 rev A, and comments set out in Appendix A to the
report of handling, against the appellant’s drawings 22034_006 rev B and 19/2-/R10 rev B.
Firstly, I note that the drawing relates to the creation of a private driveway onto a public road;
Ferry Road is a private road. Secondly, while not directly relevant to the driveway itself, the
report of handling makes reference to the width of Ferry Road as being unacceptable.
I address this matter in respect of condition 3 above and conclude that it meets, or is capable
of meeting, the requirements of national guidance. Thirdly, the appellant’s drawing
number 19/20/R10 rev B shows the width of the driveway at the point of entry to be in excess
of the 4.5 metres minimum requirement; the drawing is produced at 1:200 scale and is easily
measured. 
32. I am satisfied that the appellant has demonstrated that the relevant requirements of
the council’s standard detail have been incorporated into his proposals, as shown on
drawing numbers 22034_006 rev B and 19/20/R10 rev B and satisfies national guidance.
As such, I agree with the appellant that the proposed measures are commensurate with a
lightly-trafficked road and the minimum necessary to address the road safety concerns of
the council. I consider the condition as it stands unnecessary. 
Condition 6 
33. Condition 6 relates to the surfacing and drainage arrangements of the driveway to
the proposed dwelling. The appellant argues that the condition is unnecessary as drawing
number 19/20/R10 rev B describes the surfacing material to be used and illustrates the
intended drainage arrangements, including the provision of a drainage channel and
soakaways either side of the driveway. In this regard, I note that the legend to drawing
number 19/20/R10 rev B states that the first 5 metres of the driveway will be surfaced with a
bitumen macadam. It also shows the location of the drainage channel and the soakaway
pits on either side of the driveway. Accordingly, I agree with the appellant that condition 6 is
unnecessary. 
Condition 7 
34. Condition 7 relates to the gradient of the driveway, which should not exceed 5% for
the first 5 metres, and be no more than 12.5% over the remainder of its length. The gradient
of the driveway is shown in long section on drawing number 19/20/R10 rev B. I note that the
gradients specified meet the council’s requirements. However, the council argues that the
condition should remain as the drawing includes other (unspecified) details which do not
Page 186

Page 187

PPA-130-2086  7
accord with its roads guidance. The condition has been amended from that originally
proposed to require details of the driveway gradients to be submitted to the planning
authority for its written approval. 
35.  As I note above, details of the driveway gradients and the lengths over which it
would rise are clearly set out on drawing number 19/20/R10 rev B. As such, I agree with the
appellant that the condition is unnecessary and should be removed. Nor is it reasonable to
require the information to be submitted for further approval when it is other unspecified
elements of the proposal which are deemed unsatisfactory. In any event, as I note above,
I find the private driveway arrangements with Ferry Road acceptable in all other respects. 
Condition 8 
36. Condition 8 requires the provision of car parking spaces within the curtilage of a
dwelling house to be in accordance with the council’s guidance as set out in Policy SG LDP
TRAN 6 (vehicle parking provision). The parties agree that the number (three) and
dimensions of the parking spaces accord with the guidance. However, as with condition 7,
details of parking arrangements are set out on a drawing which, in the view of the council,
also includes other unspecified details which do not accord with its roads guidance. As
such, it believes that the condition should remain. The condition has been amended from
that originally proposed to require details of parking provision to be submitted to the
planning authority for its written approval. 
37. The parking arrangements are clearly set out on drawing number 19/20/R10 rev B.
They accord with the council’s roads guidance. As such, and for the same reasons that I set
out in paragraph 35 above, I agree that the condition is unnecessary and should be
removed. 
Other matters 
38. In paragraph 6 above, I refer to an incorrect set of drawings that were stamped
approved and issued by the council. Given that this appeal is made under Section 42 of
the 1997 Act, it is in effect seeking a new planning permission. Given my decision to allow
the appeal, a revised schedule of approved drawings is provided in the table that forms part
of condition 1, including those relating to the construction of the dwelling house and the
landscaping of the site. 
39. The Rhu and Shandon Community Council objects to the proposed development.
However, as noted by the appellant and confirmed by its representatives at my site
inspection, it is the road improvements sought by the council and their effects on the
character and appearance of the conservation area that is of concern to the community
council. Also, despite some confusion regarding the nature of the application, this view is
shared by almost all those that made representations to the council on the application;
essentially village residents and visitors to Rhu Point do not wish to see Ferry Road
improved to an adoptable standard. I deal with this matter in detail above in relation to
condition 3. 
Appellant’s proposed conditions 
40. The appellant suggests that the proposed improvements to Ferry Road, access to
the appeal site and parking and turning provision within it can be secured through the
imposition of three conditions. I have considered the suggested conditions and agree that
they would secure the improvements proposed. Furthermore, with minor amendments they
satisfy the tests of Circular 4/1998. With regard to replacement condition 3, for clarity,
I have added the title of the drawings referred to. In replacement condition 4, I have
Page 187

Page 188

PPA-130-2086  8
amended the suggested text to make clear that the ‘x’ value shown on drawing
number 22034_006 rev B should be 2 metres, not 2.4 metres. Replacement condition 5 is
unchanged. For completeness, condition 1 has been amended to take account of my
decision to allow this appeal and incorporate the drawings relating to the improvement and
traffic calming measures on Ferry Road. Conditions 2 and 9 remain unchanged, although
condition 9 is renumbered condition 6. 
41. In the interests of consistency, in setting out the conditions attached to this grant of
planning permission, I have used the format adopted by the council, that is, the standard
conditions are unnumbered whilst the additional conditions are numbered 1 to 6. 
Conclusions 
42. In conclusion, I find that conditions 3, 4, 5, 6, 7 and 8 attached to planning
permission 21/02709/PP fail to meet the tests of necessity and reasonableness, as set out
Circular 4/1998. The appellant has demonstrated to my satisfaction that it is neither
necessary nor reasonable to require Ferry Road to be improved to an adoptable standard
given the location, nature and scale of the development proposed; it is a lightly-trafficked
private road within a conservation area. There is no evidence to suggest that the council
has undertaken an assessment of use to justify the package of improvement measures to
Ferry Road that it seeks. In the absence of such, I consider the improvements proposed by
the appellant are proportionate and would ensure that Ferry Road continues to function
safely and effectively. 
43. Furthermore, the appeal site’s location within Rhu Conservation Area requires
decision makers to take full account of the area’s special interest and ensure that new
development preserves or enhances its character or appearance. The council’s rigid
application of standards in its pursuit of infrastructure to serve the proposed dwelling house
suggests that it has failed to consider the qualities of the place before the movement of
vehicles; contrary to policies set out in Designing Streets and the LDP. Accordingly, I find
that conditions 3, 4, 5, 6, 7 and 8 should be varied or removed as described above and as
set out in the schedule of conditions attached to this notice below. 
Andrew A Sikes       
Reporter 
Conditions 
Standard time limit condition 
The development to which this permission relates must be begun no later than three years
from the date of this permission. 
Reason: in accordance with Section 58 of the Town and Country Planning (Scotland)
Act 1997 
Page 188

Page 189

PPA-130-2086  9
Standard soil management condition 
Where the development involves ground breaking works, soil management should be
undertaken in compliance with the established best practice set out in the DEFRA
publication ‘Construction Code of Practice for the Sustainable Use of Soils on Construction
Sites 2009’, unless an alternative methodology for the sustainable management of soil is
submitted to and approved in writing by the planning authority. 
Reason: in order to ensure that sustainable management of soils and compliance with the
requirements of NPF4 Policy 5A. 
Additional conditions 
1. The development shall be implemented in accordance with the details specified in the 
drawings and reports that form part of applications 20/01150/PP, dated 2 July 2020,
and 21/02709/PP, dated 21 December 2021, and listed in the table below, unless the
prior written approval of the planning authority is obtained to amend the approved
details under Section 64 of the Town and Country Planning (Scotland) Act 1997. 
Drawing number reference
and revision Dated Title
1. 19/ 20/ R01 rev A 21.03.20 Location plan
2. 19/ 20/ R06 rev A 29.05.20 Site photographs 1, 2 and 3
3. 19/ 20/ R07 rev C 22.06.20 Site photographs 4, 5 and 6
4. 19/ 20/ R08 - Site photographs 7, 8 and 9
5. 19/ 20/ R09 - Site photographs 10 and 11
6. 19/ 20/ R02 rev C 22.06.20 Site and roof plan as proposed
7. 19/ 20/ R03 rev A 24.05.20 First floor plan as proposed
8. 19/ 20/ R04 rev B 27.05.20 North and west elevations as proposed
9. 19/ 20/ R05 rev B 27.05.20 South and east elevations as proposed
10. 19/ 20/ 10 - Cross section X-X as proposed
11. 19/ 20/ 11 - Proposed landscape and planting layout
12. 4246/1 24.08.18 Topographical survey
13. - 26.06.20 Tree protection report
14. - 2020 Design and Access Statement 
15. ECS 22034_006 rev B 04.07.22 Ferry Road proposed improvements
16. 19/ 20/ R2 rev A 01.02.22 Proposed passing places
17. 19/ 20/ R4 rev D  25.01.23 Proposed traffic calming measures
18. 19/ 20/ R5 rev D 25.01.23 Combined traffic calming measures
19. 19/ 20/ R7 rev D - Ferry Road proposed improvements
20. 19/ 20/ R9 rev D 25.01.23 Ferry Road extent of resurfacing
21. 19/ 20/ R11 - Plan of junction with A814
22. 19/ 20/ R12 rev A 23.04.23 Plan of junction with Rosslea Hotel 
Reason: for the purposes of clarity; to ensure that the development is implemented in
accordance with the approved plans. 
Page 189

Page 190

PPA-130-2086  10
2. Notwithstanding the effect of condition 1; prior to the commencement of development
the developer shall submit written evidence to the planning authority that an
agreement with Scottish Water is in place for the connection of the proposed
development to the public water supply. 
Reason: in the interests of public health and to ensure the availability of an adequate
water supply to serve the proposed development. 
3. Notwithstanding the effect of Condition 1; prior to the first occupation of the dwelling
house hereby approved, the following improvement works to the access road are
required, the provision of a private access road, between the A814 Gareloch Road
and the entrance to the approved dwelling house, incorporating the improvements and
traffic calming measures shown on drawing numbers; ECS 22034_006 rev B (Ferry
Road – proposed improvements; 19/20/R2 rev A (passing places); 19/20/R4 rev D
(traffic calming); 19/20/R5 rev D (traffic calming); 19/20/R7 rev D (Ferry Road
improvements); 19/20/R9 rev D (resurfacing); 19/20/R11 (passing place); 19/20/R12
rev A (passing place). 
Reason: in the interests of road safety. 
4. Notwithstanding the effect of Condition 1; prior to the first occupation of the dwelling
house hereby approved, the access to the dwelling house shall be formed in
accordance with the details shown on drawings ECS 22034_006 rev B and 19/20/R10
rev B. Notwithstanding the dimensions shown on each drawing, the access shall
incorporate visibility splays measuring 2 x 25 x 1.05 metres, and these shall be
maintained in perpetuity, unless otherwise agreed in writing with the planning
authority. 
Reason: in the interests of road safety. 
5. Notwithstanding the effect of Condition 1; prior to the first occupation of the dwelling
house hereby approved, the parking and turning provisions as shown on drawing
number 19/20/R10 rev B shall be implemented in full. Thereafter, the approved
parking and turning provisions shall be maintained in perpetuity, unless otherwise
agreed in writing with the planning authority. 
Reason: in the interests of road safety and in accordance with the council’s ‘Roads
Guidance for Developers’. 
6. Notwithstanding the effect of Condition 1; prior to works commencing on site, samples
of the proposed materials to be used for the external walls and roof of the
development hereby approved shall be submitted to and approved in writing by the
planning authority. 
Reason: in the interests of the visual amenity and the integration of the proposed
development with its surroundings.
Page 190

Page 191

Document is Restricted
Page 191 Agenda Item 10NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 192

This page is intentionally left blank