Democracy Spraffa

Agenda Pack

North Lanarkshire Council · 17 May 2023
Back to Health and Social Care Integration Joint Board — 17 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
A meeting of the Integration Joint Board Committee will be held on 
Wednesday 17th May at 9.30am-12pm via Microsoft Teams 
If anyone would like to join this meeting, please contact Stacey Connor on 01698
752594 or by email at Stacey.Connor@lanarkshire.scot.nhs.uk for the relevant
information.                     
AGENDA  
CHAIR: Cllr Ayeshah Khan 
No  Time  Item  Action  Attachment Reporting 
1.    Welcome and Apologies     A Khan
2.    Declaration of Interests  Members are invited to declare
any interest in relation to any of
the agenda items
Board
Members
3.    Minutes  IJB -22nd March
2023
For
Approval
Attachment A Khan
4.    Matters Arising - Action Log For
Approval
Attachment R
McGuffie 
GOVERNANCE 
5.   IJB Risk Register  For Approval Attachment R McGuffie
6.  Governance Report For Approval Attachment S
Anderson 
PERFORMANCE 
7.  Resilience Update  For Noting Attachment R
McGuffie
8.  Delayed Discharge and Site
Occupancy Plans
For Noting Attachment R
McGuffie
9.  Winter Plan Business Case
Progress Report 
For Noting Attachment  G Cowan
10.  Fairer Scotland Duty For Noting Attachment K Todd
11.  Implementation of National
Trauma Framework
For
Endorsement
Attachment  A Gordon
12.  Our Health Together For Noting Attachment R
McGuffie

Page 2

2 
13.     Risk    Consider whether, from the
business discussed, any new,
emerging risks need to be added
to the  Risk Register, or whether
the discussion materially alters
the assessed level of risk/risk
tolerance and/or the mitigating
controls 
A Khan
14.    Date of Next Meeting: 
21st June 2023 10.30am-12pm

Page 3

1 
ITEM 3  Integration Joint Board
Committee 
Minutes from a meeting held on Microsoft Teams
on Wednesday 22nd March 2023 at 2pm-4.20pm 
Present:  
Voting
Members:
Ally Boyle NHS Lanarkshire Nominated Non Exec Director 
Councillor Gerry Brennan North Lanarkshire Nominated Councillor 
Councillor Bob Burgess North Lanarkshire Council Nominated Councillor 
Philip Couser  NHS Lanarkshire Nominated Non Exec Director 
Councillor Paul Kelly  North Lanarkshire Council Nominated Councillor 
Councillor Ayeshah Khan
(Chair)
North Lanarkshire Council Nominated Councillor 
Brian Moore  NHS Lanarkshire Nominated Non Exec Director
Non-Voting
Members:       
Professional
Advisors
Amanda Kilburn Chief Finance Officer North HSCP 
Ross McGuffie Chief Officer, North Lanarkshire HSCP
Stakeholders Cathy McGinty Staff Side Representative NHSL 
Elizabeth Seaton Partnership for Change 
User Rep 
Harry Robertson Carer Representative 
John Watson Employee Representative NLC Unison 
Officer in
Attendance:
Stacey Anderson Support Services Project Manager 
Stacey Connor  Minute Secretary 
Mark Dell Communications Manager 
Morag Dendy Head of Planning, Performance & Quality 
Diane Fraser Head of Adult Social Work Services 
Alison Gordon  Head of Children & Families & Justice Services
CSWO of NLC 
Maddie Halliday Chief Exec, VANL
Third Sector Rep 
Trudi Marshall Nurse Director NLHSCP 
Dr Lucy Munro Medical Director NL 
Des Murray Chief Executive NLC 
Fiona Owens Audit Scotland 
Dr Tyra Smyth  General Practitioner  (GP) 
Maggs Thomson Head of Health North HSCP

Page 4

2 
APOLOGIES: Dr Kenneth Dagg Secondary Care Medical Practitioner 
James Muir NHS Lanarkshire Nominated Non Exec Director 
ACTION 
1. Welcome and Apologies 
The chair welcomed everyone to the meeting and introductions were made;
apologies were as noted above. 
2. Declaration of Interests      
There was no declaration of interest made.     
3. Minutes of IJB (30th November 2022) 
The previous minutes were approved as an accurate reflection of the
discussion. 
4. Matters Arising/ IJB Action Log     
There were no matters arising. 
Ross McGuffie shared an updated action log to reflect the progression of
work since the last committee. He drew attention to the below updates: 
Item 8 Mental Health Continuing Care Contracted Beds   – Ross McGuffie
confirmed there are on-going discussion with providers and families to plan
move of beds. 
Item 11 Provision of smoke alarms- Ross McGuffie advised update will be
provided as part of the broader technology team once all work is completed. 
5. IJB Reserve Strategy     
Consistent with a number of other Health and Social Care Partnerships, an
underspend was reported to the IJB on 22 June 22 totalling £74.67m and
was transferred to reserves.  This 2021/2022 underspend included funding
received to meet the ongoing cost and recovery to the Covid-19 pandemic
and also funding made available by the Scottish Government to progress
policy commitments and national priorities.   
The IJB Reserves Strategy 2022/2023 provides an opportunity to strengthen
long-term financial sustainability by considering the allocation of the
2021/2022 underspend to the strategic priorities of the IJB and both partners. 
The IJB Reserves Strategy 2022/2023 will enable the IJB to balance current
commitments whilst planning and addressing financial risks.

Page 5

3 
It is essential for the long-term financial stability and the sustainability of the
IJB that sufficient funds are held in reserve to manage unanticipated
pressures from year to year.  The requirement for financial reserves is
acknowledged in statute and is part of a range of measures in place to
ensure that section 106 public bodies do not over-commit themselves
financially. 
The reserves balances at 31 March 2022 were £119.452m.  This figure
comprised of £70.05m earmarked reserves to support the delivery of
projects which span financial years and £45.718m ring-fenced monies to
enable the IJB to deliver on specific Scottish Government funded
programmes.  The remaining balance of £3.684m, is contingency reserves
which are not held to meet any specific liability and offer the IJB some
flexibility to deal with unforeseen events or emergencies.   
Some reserves where set aside for project which were no longer required
and there has also been new reserves identified which require funding so
this has led to the review of the strategy. 
It was proposed to move £900k to education services for school counselling
service appointments to support the CAMHS services. This was support by
the committee. 
John Watson queried is it within the IJB guidelines that the committee can
hold reserves, Ross McGuffie confirmed this has been the case since the
IJB was established. 
Brian Moore asked will further updates come back to the committee and
would it be possible to show what is aligned to SCP. 
Amanda Kilburn confirm she will provide the committee with further updates
in due course and can demonstrate what is aligned to the strategic
commissioning plan. 
The IJB agreed the following recommendations:
(1) Note the contents of the report; 
(2) Approve the proposed transfers to earmarked reserves in section 7.5
and
(3) Approve the proposed realignment of reserves in appendix 1.   
6. Medium Term Financial Plan 2023       
The Medium-Term Financial Plan (MTFP) outlines the financial challenges
and opportunities the Health and Social Care Partnership (HSCP) face
over the next three years and provides a framework which will support the
HSCP to remain financially sustainable.  It will complement the Strategic
Commissioning Plan 2023 – 2026, highlighting how we will support the
delivery of the IJBs strategic objectives and priorities.

Page 6

4 
Year 2022/2023 2023 to 2030
Contingency Reserve % 3% 5%
As part of the development of the financial plan and in line with the North
Lanarkshire IJB Medium to Long Term Financial Plan 2020/21 to 2029/30,
if possible, it is recommended that the risk-based and contingency reserves
are established as a percentage of the financial envelope as follows: 
The IJB contingency reserves currently equate to 2% of the financial
envelope, however, following completion of the 2022/2023 financial year
end, it is anticipated this percentage will increase. 
The plan will be updated when more information is provided. 
Phillip Couser queried what do we do around recurring savings. Ross
McGuffie acknowledged the relationships with partner organisations has
helped the financial situation. The aim of the SCP is to link with savings
plans to build for the next financial year. 
Maddy Halliday asked for the underspend, is there any scope to look at
different provision for the funding if there continues to be a challenge to
recruit to certain areas. Ross McGuffie acknowledge this has been the
case in the past so services will have a look at different skill mixes for
services models in future. 
The IJB: 
(1) Note the assumptions and context of the financial plan; and
(2) Approve the Medium-Term Financial Plan 2023 - 2026.     
7. Financial Monitoring     
The report tabled provides a summary of the financial position of the North
Lanarkshire Health and Social Care Partnership (HSCP) for the period from
1 April 2022 to 3 February 2023. 
The IJB year to date position is an underspend of £13.75m and the
projected outturn for 2022/23 is an underspend of £16.199m, assuming the
current trajectory of spend continues throughout this financial year. 
Subject to IJB approval, this estimated underspend will be allocated to
manage, on a non-recurring basis, ring-fenced commitments, additional
future business plans and any funding gap which may be highlighted in the
North Lanarkshire IJB Medium Term Financial Plan 2023-2026. 
The following provides a high-level summary of the key pressures and the
main reasons why the IJB is currently projecting an underspend against its
budget this year:

Page 7

5 
 Employee Costs net underspend of £12.205m: as previously
highlighted there are ongoing challenges in terms of recruitment
and retention issues across all service areas.  For a wide range
of posts recruitment has been unsuccessful due to the availability
of the skills mix required or the competition being offered by
other private and public sectors.  These are issues that are being
faced by IJBs across Scotland. 
 Home Support net overspend of £0.542m: within Home
Support Services, employee costs have increased as the service
continues to support delayed discharges and demand however,
this additional cost is being part funded from an earmarked
reserve and the current number of vacant posts throughout other
parts of the partnership. 
 Payments to Other Bodies net underspend of £2.840m: the
underspend is primarily due to the staff shortages and vacancies
within the Care at Home sector who provide services to
individuals via the self-directed support commissioning
framework.  There is also an underspend in package costs due
to slippage in Self-Directed Support (SDS) start dates.  It is
anticipated these are in-year underspends only and the full
budget will be required in future years. 
 Independent Care Homes net overspend of £0.788m: there
are currently 1,503 care packages within this service however
when the budget was set for this financial year, it was based on
1,461 care packages.  Included within this overspend is £252k
interim care bed expenditure, which will be offset by a 25%
funding allocation from Scottish Government in relation to winter
planning. 
 Admin Costs net underspend of £1.884m: within the carers
funding there is currently an unallocated budget of £1.8m.  Work
is continuing to allocate this is relevant carers package in
2022/23.  At year end, any remaining underspend will be
transferred to a dedicated earmark reserve to fund carers
pressures in 2023/24. 
 Prescribing net overspend of £0.300m: activity and cost per
item within prescribing is 4.6% higher compared to the same
period last year, which has caused this budget to move from a
breakeven position when last reported to the current overspend
position.  Due to the uncertainty around costs and prescribing
activity and the three-month time lag in receiving the data, the
volatility experienced within prescribing is likely to continue for
the foreseeable future.

Page 8

6 
Brian Moore asked is there any scope to move away from using agency
staff, is there other options we can consider to reduce this cost. Trudi
Marshall noted undertaking work in Nursing, Midwifery & Allied Health
Professionals (NMAHP) to reduce agency costs at a national and local
level. Have agreed to move back to national framework which means the
costs will reduce and starting to look at introduction of other types of roles
within departments. Lucy Munro added will be looking a medical locum
spend also. 
The IJB agreed the following recommendations:
 Note the contents of the report; and
 Note the financial position is a year-to-date underspend of £13.75m     
8. Delegated Health & Social Care Budget 2023/2024         
As reported throughout this financial year, the IJB will deliver an underspend
on its core budget.  The IJB projected underspend of £16.199m for 2022/23
financial year takes into account the ongoing challenges in terms of
recruitment and retention across all service areas.  These are issues that are
being faced by IJBs across Scotland. 
Similar to social care, demographic and socio-economic factors continue to
drive significant demand and cost pressures for our delegated health
services in 2023/24 including: 
 Pay inflation and the impact of agenda for change.
 Inflationary cost pressures across service level agreements on
non-pay budgets.
 Prescribing cost, volume, and short supply impact. 
Using a range of informed assumptions, the CFO has estimated that the
demand and cost growth for health services (not including Set Aside) in
2022/23 linked to the areas highlighted above, is likely to be in the region of
a gross increase of circa £10m. 
The NHS Lanarkshire Health indicative budget offer for 2023/24, is based
on an uplift of 2% and is in line with the letter of the 15 December 2022 from
the Director of Health Finance and Governance.  It is anticipated that a
formal budget offer will be issued following NHS Lanarkshire board approval. 
The IJB agreed the following recommendations:
 Agree to accept the delegated social care budget for 2023/24 in
section 9.4; 
 Agree to accept the delegated health budget for 2023/24 in section
10.4 subject to:
- the expected uplift of 2% reflecting the boards uplift for
2023/24;
- any final adjustments in relation to recurring budget
adjustments at month 12; and

Page 9

7 
- any further funding allocated by the Scottish Government.
 Approve a drawdown of reserves, if required, in order to fund any
shortfall in funding for 2023/24 and
 Approve increases to the IJB’s contingency reserves in 2023/24,
through the appropriate utilisation of permitted financial flexibilities, in
order to protect the financial resilience of the IJB.   
9. Annual Audit Plan     
Fiona Owen attended the committee to present the external audit plan. 
There continues to be a significant risk of cyber-attacks to public bodies, and
it is important that they have appropriate cyber security arrangements in
place. A number of recent incidents have demonstrated the significant
impact that a cyber-attack can have on both the finances and operation of
an organisation. In 2022/23, we will consider North Lanarkshire IJB’s
arrangements for managing and mitigating cyber security risks. This is a
presumed risk contained within every audit. 
The Annual Audit is planned to be signed off at the September IJB
committee. 
Maddy Halliday welcomed point 26 “The Auditor General and Accounts
Commission are developing a programme of work on climate change. In the
third sector support for community climate is being considered; this was
noted. 
The committee noted the report. 
10. Resilience Update       
NHS Lanarkshire stood down its Live Covid Incident in January 2023,
however, the operational pressures emanating from the pandemic recovery
have been pronounced, with NHS Lanarkshire in Black status since 27th July
2022. 
Operation Flow was developed to create a ‘firebreak’ to rapidly reduce
hospital inpatient capacity, then creating the staff capacity to work on service
redesign to bring the system as a whole back into equilibrium. 
Following the 9-day firebreak, hospital inpatient capacity reduced by around
15% across Lanarkshire, supporting the system to move from black to red
status on 6th March 2023. 
Following extensive whole-system collaboration and planning, the Firebreak
commenced on 23rd February and ran until Friday 3rd March 2023, covering
the following coordinated actions:

Page 10

8 
 Mobile multi-agency team undertaking daily review of all acute
inpatients across the 9 days, with the aim of identifying actions that
can be taken to facilitate discharge or transfer to a more appropriate
location to reduce the number of additional patients across our Acute
Hospitals. 
 Mobile multi-agency team undertaking daily review of all patients in
an offsite bed across the 9 days to create flow from our Acute sites. 
 Mobile Multi-agency teams capturing the number of clinically stable
patients who are waiting for a diagnostic test by modality to expedite
these tests/procedures to facilitate discharge. 
 Provision of professional to professional clinical decision making
support for care home residents prior to conveying to hospital.  SAS
crews using consultant connect to access support / advice from
Emergency Medicine colleagues for patients prior to making a
decision to convey to hospital (excluding 999 category patients).
 Reduced number of access routes to hospital based urgent and
emergency care. All potential referrals to Emergency Department,
Care of the Elderly and Hospital @ Home from SAS crews via
Consultant Connect to determine if there are other alternative care
options rather than hospital (excluding 999 category patients).
 Expanded access to Ambulatory Care during the Firebreak period by
increasing hours of operation over the weekend period and
redirection of patients referred by NHS 24 on 111 to treatment rooms
for wound care, minor burns etc. 
 Increased senior clinical decision maker resource in Hospital @
Home to support more people in the community for the duration of the
Firebreak period. 
 Increased capacity within Home Assessment Teams within Wishaw
and Cumbernauld areas to support discharge. 
Councillor Gerry Brennan queried was the firebreak labour intensive and
could this be continued in future. Ross McGuffie confirmed it was labour
intensive with overtime and weekend working in place to support the work.
Will consider ways that this work can be used in future to support winter
planning. 
Ally Boyle asked how will space be built in for learning from the work
undertaken. Ross McGuffie advised the aim of the firebreak was to get
stability across the whole system. Which was evident in being able to moved
down from Black status. Really improved relationship and understanding
across different services also. 
The IJB:
(1) Note that NHS Lanarkshire stood down its Covid Live Incident down
in January 2023, though command structures have been adapted to
continue to focus on ongoing wider resilience challenges, specifically
around service pressures

Page 11

9 
(2) Note that NHS Lanarkshire was able to move from black to red status
on 6th March 2023, following a successful ‘firebreak’ as part of
Operation Flow   
11. Amendment to Terms of Reference       
The Terms of Reference for the Integration Joint Board are formally set out
in the Public Bodies (Joint Working) Integration Joint Monitoring Committees
(Scotland Act) Orders 2014 with particular reference to the Scottish Statutory
Instruments 2014 No.285. 
The Terms of Reference for the PFA were formally approved at the IJB
meeting on 23 November 2017 and formally reviewed in March 2018 and
December 2020. 
The IJB is asked to approve a further extension to the PFA Terms of
Reference which is detailed at section 6. 
The IJB is asked to delegate to the PFA the power to approve the IJB Annual
Accounts, effective from the financial year 2022/2023 and each year
thereafter.  This amendment would give flexibility allowing the accounts to
be approved within the scheduled timetables of either the IJB or the PFA and
would reduce the need for a further meeting to be convened. 
The financial information reported in the IJB Annual Accounts has been
reported to both the IJB and PFA throughout the financial year.  
Subject to the approval of the proposed amendment by the IJB, the above
responsibilities in respect of the consideration of the External Auditors
Annual Audit report and the approval of the IJB Annual Accounts would be
delegated to the PFA. 
Harry Robertson queried the membership of the group. Ross McGuffie
confirmed at the start performance, finance and audit includes 3rd sector
representations. 
The IJB approved the revised Terms of Reference for the PFA noting the
changes outlined in section 6.3 of the report. 
12. Risk Register     
Following discussions at the last meeting of PFA on 14th February 2023,
there has been a number of changes in the risk register: 
 3 risks closed:
o IJB 03/21 – EU withdrawal
o IJB 08/21 – Financial Implications of Covid
o IJB 09/21 – Impact of pandemic on implementation of the
strategic plan
 1 risk increased:

Page 12

10 
o IJB 06/21 – Prescribing – increased due to the projected
increased costs facing the partnership in 2023/24
 2 new risks identified:
o IJB 19/23 – Service sustainability – a broader risk on
sustainability challenges, replacing previous risks on EU
withdrawal and Covid
o IJB 20/23 – Workforce sustainability – a broader risk on
sustainability challenges, replacing previous risks on EU
withdrawal and Covid  
There are currently two risks rated as Very High on the IJB risk register.
 IJB 06/21 – Prescribing Activity and Costs 
 IJB 17/22 – Unscheduled Care 
There are eight high rated risks on the IJB risk register.
 IJB 01/21 - Financial Challenges 
 IJB 04/21 - Notional Set Aside Budget 
 IJB 12/21 - Staff Health & wellbeing 
 IJB 14/22 – CAMHS
 IJB 15/22 – Cost of Living
 IJB 16/22 – National Care Service
 IJB 19/23 – Service sustainability
 IJB 20/23 – Workforce sustainability 
It is planned to use a future IJB liaison session for a risk management
session to look at risks in greater detail. 
Maddy Halliday would welcome review of risks to identify interdependencies
which require further review for links to the 3rd sector. Ross McGuffie
acknowledged the risks noted are for the broader HSCP workforce inclusive
of the 3rd sector. 
Brian Moore acknowledged the work which has gone into updating the risk
register and inclusion of mitigations; this was noted. 
The IJB noted the contents of the report which includes the latest version of
the IJB risk register and a note of those operational risks highlighted by the
Heath & Social Care North Lanarkshire partnership that impact upon delivery
of IJB business.   
13. Risk Management Strategy     
This initial Risk Strategy was put in place for December 2015, and was since
updated and approved at the IJB in January 2018.

Page 13

11 
Over the last year, there has been significant development in the IJB’s
approach to risk management, with the risk reports now forming a much
more substantial item of business at IJB meetings. 
There are three main risk registers across the partnership:
 IJB Register outlining the strategic risks to the Integration Joint
Board
 Health operational register, hosted within the NHSL system
 Social Work operational register, hosted within the NLC system
Ross McGuffie wanted to acknowledge special thanks to corporate risk
managers and their assistance in the process; this was noted.
Ally Boyle noted the paper says for any risk that are high or very high they
are above tolerance will this be the case going forward. Ross McGuffie noted
this has always been the case, there has been an increase in risk profiles
aim to maintain a score of 10 or below going forward. Future reports will be
more focused on the risk scoring and what actions will assist in lowering the
scores. 
Maddy Halliday would be keen to explore risk appetite and innovation to
learn and approve particularly with new projects. Ross McGuffie confirmed
this can be covered as part of risk session. 
The IJB approved the new IJB Risk Management Strategy.   
14. Category One Responders     
On 15th January 2021, the Cabinet Secretary for Health and Sport wrote to
confirm the intention to include IJBs as Category 1 Responders on
conclusion of the consultation. 
The North IJB welcomed the proposed change to make IJBs formal Category
1 Responders, whilst noting the positive local arrangements already in place
that have seen the IJB fully embedded in the local resilience partnership
processes for some time. 
Through the WoSRRP, a short-term working group was convened with IJB
Chief Officers and West of Scotland leads to gain assurance around the IJBs’
preparedness and integration into the wider resilience community following
their categorisation as Category One organisations in 2021. 
Through this process it was agreed to conduct a survey with all West of
Scotland IJB’s and Local Resilience Partnerships to gain assurance that the
IJBs were now fully embedded within the local resilience structures, in line
with the expectations set out in the Act.

Page 14

12 
Within the Lanarkshire Resilience Partnership, a collaborative process was
undertaken to complete the survey in conjunction with the two Councils, NHS
Lanarkshire and the two IJBs. 
The North Lanarkshire IJB/HSCP is well embedded in the Local Resilience
Partnership structures, at both the strategic and operational levels. The
IJB/HSCP has active Business Continuity Plans; is tied into the multi-agency
emergency plans and has played a full and active role in a number of
planning exercises. 
The IJB:
1. Note the progress made in confirming identified resilience leads;
2. Note that local resilience plans will be updated once further guidance is
received. 
15. Strategic Commissioning Plan 2023-2026 
The Board approved the draft version of the Strategic Commissioning Plan
at its meeting on 30 November 2022, subject to final consultation during the
months of December, January, and February. The draft plan was published
online in early December, alongside a survey questionnaire which allowed
members of the public and any other interested parties to give their feedback
on the draft plan. Feedback was generally positive and additional
suggestions have been incorporated into the final draft. The feedback from
the survey is published as an appendix to the final Strategic Commissioning
Plan.   
A programme of work is set out within the plan outlining the key work
programmes that will be undertaken over the three-year period to meet the
key priorities within the Strategic Commissioning Plan.  Key deliverables and
timescales will be further developed, with regular reports on progress to be
made to the Board and its Committee. 
The approach to the development of the plan and the completion of the
process has been overseen by internal audit. 
The final version of the plan, once approved, will be graphically designed,
and published online. 
A first draft of the plan was published for consultation in February and
feedback has been incorporated within the final draft version of the plan
attached to this report. 
The next steps will be to develop the programme of work alongside the plan,
it will include a project management approach to key areas. 
Harry Robertson asked how can we analyse usage by Northern corridor
patients going to other Health Board services. Morag Dendy noted using
local intelligence to help explore data.

Page 15

13 
Phillip Couser expressed an interest in accessibility of the document to the
general public in a summarised format. Morag Dendy advised will make use
of the new HSCP website to draw attention to key elements of the overall
plan. 
Brian Moore asked how do we use this information through the IJB to get an
oversight of data collected particularly around future resource use. Morag
Dendy confirmed it will be part of locality planning groups to inform future
discussions required. 
Maddy Halliday asked if there is any other feedback from other stakeholders
and she asked if wording can be changed to be more inclusive for 3rd sectors.
Morag Dendy was happy to accommodate in anyway possible. 
Ally Boyle noted the plan was taken to population health committee and it
was well received. The needs analysis within the report provides a strong
insight and should be used as a ’predictive needs assessment’; this was
noted. 
The committee approved the final version of the SCP.   
16. HSCP Website Update       
The HSCP North Lanarkshire is fully committed to promoting and facilitating
the active involvement and engagement of the public, people who use
services, carers, the community, voluntary and the independent sector,
wider partners, staff and potential staff across all levels of the whole health
and social care partnership. 
A key strand of facilitating that active involvement and engagement is a great
website. The new website was launched at the end of February 2023 which
brings together months of work from a wide range of staff and partners and
catches up on time lost through the pandemic. 
Mark Dell advised use tools to scan website to identify any accessibility
issues and it is now managed in house so changes can be made easier. 
The IJB:
(1) Note the launch of the new website
(2) Request that further reports are brought on the performance and
analysis of the use. 
17. Chryston Community Health Clinic Update     
From 1st April 2014, Health Board boundaries were realigned with those of
the Local Authorities across Scotland, with the aim of reducing administrative
barriers and ensuring full alignment with the integration of health and social
care services as set out in the Public Bodies (Joint Working) (Scotland) Act.

Page 16

14 
This boundary change aimed to facilitate the development of integrated
services across all areas of Scotland. The change resulted in the Northern
Corridor (covering the areas of Moodiesburn, Muirhead, Chryston, Stepps,
Gartcosh and Auchinloch) being transferred into the NHS Lanarkshire
(NHSL) boundary. 
Due to the limited capacity of this facility, NHSL was unable to fully repatriate
services from NHSGG&C, resulting in northern corridor residents having to
travel significant distances across Glasgow to access some health services,
with teams and clinics based in a range of areas including Shettleston,
Kirkintilloch, Easterhouse and Bridgeton. 
A Service Level Agreement (SLA) continues to be in place and as of
February 2022 this exposed H&SCNL to a £392k financial gap if services
where to be delivered with the known funded establishment and skill mix of
the NHS Lanarkshire service model. 
It was also recognised in February 2022 that to support the smooth
transition, clinical safety and continuity of care there would be an expectation
of double running costs for a period of 3 months, equating to an increased
cost of £212k for that quarter. 
In conclusion, the report confirms that Chryston Community Health Centre
has been commissioned by NHSL in partnership with NLC and is on track to
be operationally available for service delivery from August 2023.   
In tandem with the build programme, work is ongoing to repatriate the
identified services, with work ongoing with both finance and operational
teams. 
The IJB has already approved additional funding to support double running
costs for one quarter, as well as additional recurring funding to support the
roll out of the NHS Lanarkshire service models in the area. Work continues
between the two finance departments around the financial transfers and
further updates will come to the IJB once finalised. 
The IJB:
1) Note the active and ongoing progress with the delivery of this capital
programme.
2) Note the progress with the repatriation of the clinical services from
NHS Greater Glasgow & Clyde (NHSGG&C) and their associated
Health and Social Care Partnerships (HSCP’s)   
18. Improving Cancer Journey     
Following a paper being presented to the IJB on the 22 June 2021 endorsing
the phase 1 application to Macmillan Cancer Support to access funding of
£2m to improve the cancer journey across Lanarkshire, the paper today
seeks agreement to Phase 2 of the application.

Page 17

15 
In June 2021 the North Lanarkshire IJB endorsed Phase 1 of a two-part
application to the fund to scope the local approach in partnership with VANL. 
The application to the fund was seen as an opportunity to align the ICJ
approach to the Community Solutions work led by VANL. Improving the
journey for people with a cancer diagnosis and for those affected by a
diagnosis aligns closely to Community Solutions health and social care
investment programme focused on building communities where people can
have full, independent lives. 
A Programme Manager was jointly appointed by North Lanarkshire HSCP
and the South Lanarkshire HSCP to lead on the implementation of the
Improving Cancer Journey Programme across Lanarkshire. The total cost of
this post was included in the South Lanarkshire HSCP application and is
£0.382m over the five-year period of the programme to 2026. 
It was intended that the second part of the bid be submitted to secure
additional funding of £652,000 to invest in localities to further develop and
expand services and support to improve the cancer journey. The second
phase of the project being targeted to areas of greatest need and where
maximum benefit will be secured. 
Ally Boyle noted his endorsement for the service provision provided and links
to other work within Lanarkshire. 
The Committee: 
Endorse the application for funding from Macmillan Cancer Support to
implement Phase 2 of the Improving Cancer Journey approach in order to
develop the support for people with a cancer diagnosis and those affected
by a diagnosis to improve the cancer journey for individuals, their carers,
their families and friends.   
19. Chief Social Work Officer Annual Report 
In line with guidance this report is approved through the Council and this
approval is exercised both through the Adult Care and Social Work
Committee and the Education, Children and Families Committee.  The Adult
Care and Social Work Committee approved the report on 21st February 2023
and the Education, Children and Families Committee will consider the report
on 28th February 2023. 
The report is presented to the Integrated Joint Board in order to provide an
overview of social work activity and performance for the period 2021/22 in
addition to providing context relevant to service delivery with respect to
governance, resources, workforce, challenges and opportunities.  A number
of areas covered within the report will already have been the subject of more
detailed reporting to the Board over this period however this overview is

Page 18

16 
intended to facilitate the Board’s oversight, scrutiny and future planning with
respect to social work services. 
Ally Boyle is there consideration for staff being able to access funding to
qualify as a social worker as some are self-funded. Alison Gordon advised
this a professional where there is not a national bursary process, previously
Lanarkshire did have an internal programme but it was suspended. Funds
have been set aside to re-open this to improve staff pathways into the
profession. 
John Watson asked has there been any progress for social work recruitment
and he noted there are difficulties with recruitment and foster carers. Alison
Gordon advised for recruitment looking at what can be done within the
current context but this is a national issue and we are supporting years in
practice for newly qualified social workers. Seeking new ideas on how to
recruit foster carers within local communities. There is a dedicated team for
kinship carers who link with other teams to provide support. 
Brian Moore noted one of Lanarkshire risks was around public protection
and failure to identified harm, are there gaps around responsibilities of staff.
Alison Gordon noted we need to pay attention to emerging risks and ensure
all staff have a basic awareness of their responsibilities. 
Phillip Courser asked does technology issues within social care hold back
the services. Alison Gordon noted do rely on qualitative stories and
experiences to back up information collated. Have commissioned a new
database for social work to get an opportunity to pull and manipulate
information. 
The IJB agreed the following recommendations: 
(1) Endorse this report 
(2) Note the approval route through Council committees. 
20. IJB Directions Report 
In accordance with the requirements set out in the Public Bodies (Joint
Working) (Scotland) Act 2014, the North Lanarkshire Integration Joint Board
is required to issue a direction to Lanarkshire NHS Health Board and North
Lanarkshire Council in respect of the delivery of integrated functions and
how resources are to be allocated for the resultant services. 
The letters of direction are attached at appendices 1 and 2 within the report
and, following the approval of the IJB, will be issued to North Lanarkshire
Council and Lanarkshire Health Board by 31st March 2023.

Page 19

17 
The focus for the year ahead will be on implementation of the year 1
programme of work of the IJB’s new Strategic Commissioning Plan, 2023-
26. 
The financial resources available are detailed in annex 4 of each direction. 
The budget for 2023/24 is indicative at this stage.  A range of estimates have
been agreed the Director of Finance of NHSL and the Head of Financial
Solutions of NLC in respect of the preparation of the IJB Financial Plan
2023/2024 which will be updated during the course of 2023/2024 when costs
and additional funding, as appropriate, are confirmed.  As part of the detailed
budget setting process, the financial allocations to each partner will therefore
be finalised by the IJB Chief Financial Officer, in consultation with the
Director of Finance of NHS Lanarkshire and the Head of Financial Solutions
for North Lanarkshire Council.   
Ross McGuffie advised work is on-going to change templates to be more
inclusive of directions and to update the committee more often; an update of
this work will be brought to a future committee. 
The committee agreed:
(1) Seeks the approval of the IJB for the issue of the directions to each
partner for 2023/2024 in line with the new Strategic Commissioning Plan
2023-26 and the IJB Financial Plan 2023/2024.   
21. Volunteering Strategy Report     
The purpose of this strategy is to set out partnership goals and activities to
strengthen volunteering across North Lanarkshire, building on the significant
progress that has already been achieved locally and contributing to
achievement of the national Volunteering Framework and outcomes. 
The committee approved the report which will be designed prior to
publication. 
22. Risk 
There were no new risk identified by the committee. 
23. Date of Next Meeting 
17th May 2023
9.30am-12pm

Page 20

1 
North Lanarkshire Integration Joint Board 2023-24 
ROLLING ACTION LOG 
NO  DATE  ITEM
NO 
DESCRIPTION  ACTION
BY 
ACTION & PROGRESS  DUE DATE  COMPLETION
STATUS
1. 22.6.22 Item 12 Strategic Commissioning
Plan 
M
Dendy/T
Marshall  
Detailed report on community nursing to be brought
back to future meeting and included within SCP 
On March 23 IJb
agenda. 
Strategic
Commission Plan
Approved by IJB Feb
2023. 
2. 31.8.22 Item 6 IJB Self-Assessment Report    R
McGuffie
Consider hosting a development session to
further explore the self-evaluation work 
Ongoing – future
Liaison session
topic
3. 14.2.23 Item
13
MH Strategy R
McGuffie
Consider dedicating liaison session for a more in-
depth discussion 
Discuss wider thematic work with Brian Moore
and Cllr Ayeshah Khan 
4.  14.2.23 Item 5 Risk Management Strategy  R
McGuffie 
A review of the IJB Risk Management process
following the introduction of the new
Risk Management Strategy
May 2023

Page 21

REPORT
Item No: 5
SUBJECT: Risk Management: IJB Risk Register 
TO: Integration Joint Board
Lead
Officer for
Report:
Ross McGuffie, Chief Officer NHSCP 
Author(s)
of Report
Stacey Anderson, Support Services / Project Manager
DATE: 17th May 2023
1. PURPOSE OF REPORT
This paper is coming to the Integration Joint Board;
For approval For endorsement To note
The purpose of this report is to provide a summary to the Integration Joint
Board on risk management activity, noting any amendments or additions to
the current risk register. 
2. ROUTE TO THE INTEGRATION JOINT BOARD
This paper has been:
Prepared  Reviewed Endorsed
By: The Operational & Business Manager and Chief Officer for H& SC NL. 
3. RECOMMENDATIONS
3.1 The IJB is asked to note the contents of the report which includes the latest
version of the IJB risk register and a note of those operational risks
highlighted by the Heath & Social Care North Lanarkshire partnership that
impact upon delivery of IJB business. 
4. VARIATIONS TO DIRECTIONS?
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1  From a good practice and sound governance perspective, all public bodies
are required to identify and take account of the impact of any potential risks in
delivering their business.
Yes  No  N/A
1

Page 22

BACKGROUND/SUMMARY OF KEY ISSUES (CONT.)
5.2  The PFA Committee has delegated oversight and responsibility for financial
and performance risks associated with the remit of the Integration Joint Board
and the PFA committee considered the finance and performance risks at its
last minute on 19th April 2023. The register was also reviewed at the IJB on
22nd March 2023. 
5.3 A full review of the risk management reporting within the IJB is currently in
progress as part of the risk strategy review and in line with the dynamic
developments and changes the new NHS Lanarkshire Risk Manager is
implementing within the board. These developments will include review of how
risk reporting is managed and presented at IJB and a further evaluation of the
improvement methodology aligned with the risk actions. In order to provide a
robust overview of these developments, a risk management session has been
scheduled for the next IJB Liaison Session and a full report of changes/
developments will be provided to the IJB PFA and IJB at the next meeting.  
5.4 Following discussions at the last meeting of PFA on 19th April 2023, the risk
register has been updated and additional controls/actions added to:
 IJB 01/21 – Financial Challenges
 IJB 04/21 – Set Aside
 IJB 06/21 – Prescribing
 IJB 11/21 – Performance
 IJB 13/21 – Care Homes
 IJB 14/22 – CAMHS
 IJB 17/22 – Unscheduled Care
5.5  There are currently two risks rated as Very High on the IJB risk register.
 IJB 06/21 – Prescribing Activity and Costs
 IJB 17/22 – Unscheduled Care
5.6  There are eight high rated risks on the IJB risk register.
 IJB 01/21 - Financial Challenges
 IJB 04/21 - Notional Set Aside Budget
 IJB 12/21 - Staff Health & wellbeing
 IJB 14/22 – CAMHS
 IJB 15/22 – Cost of Living
 IJB 16/22 – National Care Service
 IJB 19/23 – Service sustainability
 IJB 20/23 – Workforce sustainability
5.7 There are a number of high/very high rated operational risks that have been
identified as having or potentially having an impact on IJB objectives and/or
delivery of services and these are highlighted below.
No Risk  Risk
Rating
Lead
Organisation/Area
1882 Acute Sector Bed Capacity -
availability of acute beds due to
delays experienced for onwards
movement of patients 'fit for
Very
High
NHSL Corporate 
2

Page 23

transfer' to care homes, those
requiring care at home,
exacerbated by rising cases of
Covid and high demand
2085  Capacity within NHSL to respond
to ongoing challenges due to
Covid 19 and associated variants
Very
High
NHSL Corporate 
1379 Delayed Discharge Performance
and Impact
High NHSL Corporate 
1984 Impact From Stepping Down
Non-Urgent Services
High NHSL Corporate 
1832  Compliance with the Health &
Care (Staffing) (Scotland) Bill:
Clinical Workforce due to issues
of availability, recruitment and
retention. 
High NHSL Corporate 
1710  Public Protection: There is a risk
that NHSL could fail to identify
harm to any vulnerable person,
child or adult, or prevent harm to
others resulting from the
complexities of opportunity lost
due to the current reprioritising of
services in response to COVID-
19. 
High NHSL Corporate 
659 Failure to deal effectively with
major emergency
Very
High
NHSL Corporate 
2039  Staff Fatigue, Resilience,
Wellbeing & Safety – Effects of
prolonged Covid response is
adversely impacting  on staff,
increasing  staff absence and
consequently reducing 
workforce capacity.
Very
High
NHSL Corporate 
1992  Continuous Covid Response &
impact on routine PH Screening
& surveillance programmes 
High NHSL Corporate 
1587  Sustainability of the two-site
model for the Out-of-Hours
Service
Very
High
NHSL Corporate 
2004  Potential Impact on patients
resulting from disruption of day to
day clinical care in response to
Covid pandemic 
Very
High
NHSL Corporate 
1989   Ability to maintain a workforce
commensurate with the need to
suppress Covid, deliver
Vaccination  Programme,
Recover & Remobilise 
Very
High
NHSL Corporate 
2014  Recovery of Performance
2021/22
Very
High
NHSL Corporate 
2086  Sustaining GP Services  Very
High
NHSL Corporate 
3

Page 24

NLC
RIA0000446
Unable to deliver services due to
funding issues 
Very
High
NLC  - Social
Care/Social Work 
NLC
RIA0000448 
Availability of workforce to deliver
services within legislative and
regulatory compliance
requirements.
High NLC – Social
Care/Social Work 
NLC
RIA0000449
Information & Data Protection –
non-compliance with information
governance legislation,
standards and processes and
data security and inability to
retrieve relevant data with
deadlines 
High NLC – Social
Care/Social Work 
NLC
RIA0000450
Health & Safety of staff in SW &
partnership companies – failure
to ensure the health safety and
welfare at work of the service,
employees, partners and 
provider agencies 
High NLC – Social
Care/Social Work
NLC
RIA0000453
Supplier failure or services not
provided to required standard.
Insufficient number of providers. 
High NLC – Social
Care/Social Work
NLC
RIA0000457
Inadequate supervision,
governance and monitoring
across professional workforce 
High NLC – Social
Work/Social care
NLC
RIA0000458 
IT system not fit for purpose  High NLC – Social
Work/Social care
NLC
RIA0000459
Integration – there is a risk that
services and not integrated
effectively thus impacting on
improving the outcomes for
individuals receiving care and
support 
High NLC – Social
Work/Social care
NLC
RIA0000460
Performance & planning –
increasing expectations and
changing performance demands
will result in a failure to provide
performance information internal,
external and including S Govt, 
High NLC – Social
Work/Social care
NLC
RIS0000414
Community alarm and assistive
technology – unable to continue
to support people with a
community alarm system and
develop use of assistive
technology 
Very
High
NLC – Social
Work/Social care
NLC
RIS0000415
Mental Health Officers – Failure
to comply with legal obligations 
High NLC – Social
Work/Social care
NLC
RIS0000417 
Communications strategies and
engagement plans – Inadequate
strategies not aligned with
strategic objectives  
High NLC – Social
Work/Social care
4

Page 25

NLC RIS000419 Non- compliance with
Information Governance & Data
Protection 
High NLC – Social
Work/Social care
NLC RIS000426 Analogue to digital transition &
ability to provide a working
community alarm service 
High NLC – Social
Work/Social care
6. CONCLUSIONS
6.1 The IJB currently has 17 risks identified on its IJB risk register with 10 risks
rated as high or very high. 
6.2 Risks identified by H&SC NL as potentially impacting on IJB business are
highlighted in the report. 
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES  
N/A
7.2 ASSOCIATED MEASURE(S)
N/A 
7.3 FINANCIAL
This paper has been reviewed by Finance:
Yes   No  N/A
Financial risks are identified in the risk register.
7.4 RISK ASSESSMENT/RISK MANAGEMENT
This report sets out the IJB risk register and risk assurance process for the
IJB 
7.5  PEOPLE
N/A 
7.6  STAKEHOLDER ENGAGEMENT 
Stakeholders are represented at the IJB and the IJB PFA Committee and can
contribute to approval and amendments to the IJB risk register. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed:
Yes  No  N/A
8. BACKGROUND PAPER
None
5

Page 26

9. APPENDICES
IJB Risk Register Appendix 1 
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Members seeking further information about any aspect of this report, please contact
Stacey Anderson on telephone number 07976801913.
6

Page 27

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB02.
21
Financial
Reputational
01/04/2021
Ineffective Governance Arrangements
There is a risk that the IJB is unable to prevent and detect fraud and corruption within services because of 
inadequate governance arrangements and inadequate internal control systems which could lead to financial and 
reputational damage.
LOW CONTROLS
1. Fraud awareness e‐learning.
2. National Fraud initiative.
3. Locality/SW Enablement Groups.
4. Segregation of duties in relation to authorising and processing direct payments.
5  Whistle blowing policies.
6. Procurement processes and standing orders.
7. Oversight via NLC Audit and Scrutiny Panel and NHSL Audit Committee.
8. Effective governance arrangements are in place and subject to internal and external audit review.
9. IJB and IJB PFA meetings established ensuring effective oversight of financial performance.
10. The IJB does not maintain its own policies relating to the prevention and 
detection of fraud and error but instead depends on those in place at its partner 
bodies. . The IJB has a Code of Conduct in place to which members subscribe and the Members’ 
Registers of Interests are publicly available on the IJB’s website.
ACTIONS
1. Continue to raise fraud awareness through team briefings.
2. Annual planned Procurement and Standing Financial Instructions presentations.
3. Annual review of Code of Conduct
4. Review of how Members' Decleration of Interests are collated and reviewed.
5. IJB to request Fraud prevention and detection reports from both partners for oversight at the IJB PFA.
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.03.24
Previously IJB6.
Reviewed and 
updated on  
March 2023. 
Previously IJB2, 
IJB7, IJB10 and 
IJB12.
HIGH
M
EDIUM
M
arie M
oy
M
arie M
oy
SLT, IJB PFA, IJB
31.05.23
HIGHIJB.01/
21
Financial
Strategic
01/04/2021
Financial Challenges
There are a range of financial challenges which will impact on the IJB's ability to deliver the Strategic 
Commissioning Plan intentions within the financial envelope available.  These include:
1. The absence of a unique IJB financial settlement from the Scottish Government.
2. The IJB is dependent on funding from both partners.
3. Late Scottish Government financial settlement.
4. Budget reductions due to insufficient Scottish Government financial settlements and/or partner contributions.
5. New Scottish Government policy commitments e.g. Carers (Scotland) Act 2016.
6. Demographic growth.
7. Competing service priorities.
8. Conflicting partner efficiency savings programmes which adversely impact on the HSCP's ability to deliver 
services.
9. In‐year cost pressures emerging due to the underachievement of planned savings, pandemics and other 
emerging risks which may lead to an overspend.
10. Each partner may be unable to maintain their financial contributions to the IJB in future years which would 
impact on frontline health and social care services. 
11. The agreed transformational plans and service redesigns are not implemented in full and in line with the 
original implementation plan and/or do not secure the intended improvement outcomes in both performance 
standards and financial efficiency targets.
12. Future savings targets will continue to be challenging and are likely to impact on essential core services.
13. The IJB Financial Plan cannot be adhered to and budget recovery plans fail to achieve financial balance for 
both partners.
14. The impact of the pandemic on the financial sustainability of external providers in particular social care 
providers.
15. The financial implications of the impact of the pandemic on the workforce e.g. increase in sickness absence, 
early retirement requests and recruitment challenges.
The above factors would lead to a failure to achieve the desired strategic aims and would also impact on service 
delivery.
CONTROLS
1. IJB PFA Committee.
2. IJB Chief Officer is a member of each partner's key decision‐making forums.
3. Effective joint working between Chief Financial Officer and both Council and NHS Finance Departments.
4. Regular budget meetings with Chief Executives and Directors of Finance.
5. Regular HSCP budget monitoring meetings across Senior Leadership Team.
6. The IJB Financial Plan 2023/2024 has been agreed and is being reviewed regularly.
7. IJB medium term financial plan 2023‐25 and reserves strategy 2023‐24 approved at March 23 IJB
8. Capacity plans in place  to maximise efficiency.
9. IJB Integration Scheme setting out the budget recovery processes.
10. IJB Financial Regulations and financial procedures.
11. Consultation and involvement with key stakeholders including service users and carers.
12. Prescribing Quality and Efficiency Programme, SWEG, ARG and Home Support monitoring groups are in place.
13. Joint Strategic Needs Assessment and ongoing move towards preventative and anticipatory approaches.
13. Strategic Planning Group, Locality engagement sessions and Partnership Boards.
14. Effective and ongoing service user engagement, staff consultation and Trade Union liaison at strategic and local levels.
15. Financial sustainability payment arrangements in place to 31 March 2023 to support external social care providers.
16. The Scottish Government announced on 5 October 2021 an additional £300m for winter health and social care pressures.
18. Work is ongoing with both partner organisations to confirm the final 2023/24 budget. Once complete, a new risk will be created to reflect the 
final 2023/24 financial plan. 
ACTIONS
1. Annual budget setting processes within each of the partners.
2. HSCP participating in NHSL Sustainability and Value process
3. Partnership will also be connected to new national whole system groups around budget
Report Prepared by Stacey Anderson on behalf of the Chief Officer
7

Page 28

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB04.
21
Financial
Strategic
01/04/2021
Notional Set‐Aside Budget
There is a risk that resources will not be transferred from Acute Services to the HSCP in line with the shift in the 
balance of care from residential and acute settings to community based alternatives as expected in terms of the 
notional set‐aside concept.  This includes the ongoing development of locality pathways to support maintaining 
people at home e.g. transitional care models.
VERY HIGH
CONTROLS 
1.There is complete transparency and ongoing dialogue between the IJB and the Health Board on the challenges associated with the 
implementation of the notional set‐aside concept.
2. Bed modelling and capacity planning arrangements are in place. 
3. Effective working relationships between both partners and the IJB have been established. 
4. Since the inception of the IJB, an agreement is in place whereby the NHSL Health Board will manage the overspend or underspend across the 
notional set‐aside budget.  This arrangement continues to be in place for 2022/23
ACTIONS 
1.The Chief Officer and the Chief Financial Officer continue to raise this concern at a national level.
2. Discussions ongoing with NHSL Director of Finance around unscheduled care spend in 2023/24 and potential carry forward from 22/23 budget
HIGH
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.05.23
IJB05.
21
Financial
Strategic
01/04/2021
Hosted Services
There is a risk of dispute between the North Lanarkshire IJB and the South Lanarkshire IJB in respect of the 
financial allocations underpinning the Hosted Services particularly as a result of the budget changes linked to the 
implementation of devolved locality models.  This could impact on the ability of each IJB to achieve its 
commissioning intentions and may also have an adverse impact on service users across Lanarkshire.
VERY HIGH
CONTROLS 
1. North and South IJBs aim to co‐operate to ensure a pan‐Lanarkshire approach is achieved across all hosted services.
2. Financial and budgetary controls.
3. Performance reports on service delivery.
4. The Hosted Services principles in respect of the management of the overspends and underspends are agreed for each financial year.
M
EDIUM
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.06.23
IJB06.
21
Financial 
Operational
01/04/2021
Prescribing Activity and Costs
The cost of prescribing is growing due to issues in supply chains driving increased wholesaler cost of medicines, 
advance treatment developments resulting in the need for more expensive medications, aging population and 
increase in patients requiring regular medication. Medication availability has been impacted following the EU 
withdrawal the UK 's membership of the common regulatory bodies and EU agencies, such as the European 
Medicines Agency, (EMA), European Centre for Disease Prevention and Control and the European Atomic Energy 
Community. The risk is that this could impact on the availability of medicines, healthcare techniques and 
technology and in respect of the supply of medicines and medical devices, additional checks are now required at 
ports in the UK and the EEA before goods, including medical products, can cross the border.  New customs checks 
are required when moving medicines between the EEA and the UK.
M
edium 
CONTROLS
1.. Prescribing Quality and Efficiency Programme.
2. Prescribing Management Board functions and membership.
3. Deputy Lead Pharmacist supporting HSCP Senior Leadership Team.
4. Locality Pharmacist input.
5. Earmarked reserve established to address prescribing costs.
6. Regular HSCP monitoring. 
In respect of the regulation of medicines and medical devices, the Medicines and Healthcare products Regulatory Agency (MHRA) became the 
UK’s sovereign regulator.
7. The new trade deal contains specific clauses that mean both the UK and EEA states formally recognise each other’s good practice in medicine 
manufacturing.
8. To reduce the risk of divergence from the EU rules, there are three interrelated factors; the technical annexes of the new trade deal, the 
Northern Ireland protocol and the UK Internal Market Act.
9. The effectiveness of the Border Operating Model to import and export goods to and from the EEA, which was being implemented in  stages 
from 2020 to minimise any risk of disruption, is still being assessed.  The risk of border delays is still evident.  Other measures were also 
implemented specifically to mitigate the risk of supplies of medicines and medical devices being disrupted.  In August 2020 the UK government 
instructed medicine suppliers to maintain a stockpile equivalent to six weeks’ supply though the first three months of 2021.  In addition, the 
Department of Transport has secured additional freight capacity to bring medicines into the country via other routes.
ACTIONS
1. Review of Locality Prescribing Action Groups.
2. Prescribing part of NHSL Sustainability and Value structures
3. Continuation of Scriptswitch.
VERY HIGH
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.03.23
Previously IJB11.
IJB07.
21
Financial
Strategic
01/04/2021
Third and Voluntary Sector
There is a risk that Third Sector organisations in North Lanarkshire are vulnerable because of the lack of certainty 
in respect of long‐term funding security.  This uncertainty has the potential to lead to service instability, 
recruitment and retention challenges and an increasing reliance on statutory services. 
HIGH CONTROLS
1. Third Sector Interface represented on key strategic groups.
2. Community capacity building and carer support infrastructure embedded across North Lanarkshire.
3. Community capacity building is regularly reviewed.
4. Maximising funding opportunities for the third and voluntary sector will continue to be progressed.
ACTIONS
1.The annual HSCP funding which is directed to the third sector is recurring funding.  Funding will be confirmed each year in line with the 
agreement of the IJB Financial Plan and subject to the Scottish Government financial settlements for future years.
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.23
Previously IJB16.
Report Prepared by Stacey Anderson on behalf of the Chief Officer
8

Page 29

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.10.
21
Financial
Strategic
01/04/2021
Ineffective Governance Arrangements Due To the Covid‐19 Pandemic
1. There is a risk that the intensity of the required response to Covid‐19 could result in a failure of governance 
impacting on the effectiveness of the IJB decision‐making, IJB directions to partners and IJB oversight of 
operational service delivery.  Routine governance processes could be overwhelmed. 
2. New or amended Covid‐19 legislation and Scottish and UK Government guidance may not be adopted 
effectively and timeously.
3. There is no / limited public access to IJB and PFA meetings during the period of the pandemic, in line with 
Public Health advice.
4. Ineffective information governance controls could lead to data breaches and an impact on the General Data 
Protection Regulations.
5. Communications with employees, patients and service users may be ineffective.
6. There will require to be changes to the working environment including remote working and working from 
home.
7. There is a reduced ability to protect the wellbeing of employees, patients and service users.
8. There may be adverse media coverage locally, a loss of public confidence and reputational damage.
M
EDIUM
CONTROLS
1. National Networks are established which are providing the framework to support a national approach where appropriate.
2. Public Health advice and support is in place.
3. Increased numbers of agile workers and increased number of laptops/tablets.
4. Continued working from home arrangements supported by the roll out of MS Teams / Zooms.  Regular updates on the guidance for the use of 
MS Teams / Zoom Meetings is circulated.  A blended approach to home/work‐based working is being developed going forward.
5. Risk registers are in place for the IJB and each partner.  Each partner has a specific HSCP Covid‐19 Risk Register in place.
6. The IJB and both partners aim to comply with the European Working Time Directive (WTD) and minimise the risk of all staff working beyond 48 
hours per week, in particular front‐line service delivery.  As a result of the withdrawal from the European Union, the WTD ceased to apply to the 
United Kingdom at the end of the transition period (31 December 2020).  However, the UK's Working Time Regulations which implement the EU 
Working Time Directive will continue to apply unless and until amended by UK law.
ACTIONS 
1. Staff health and well being is a key priority for both partners and all key stakeholders.  The commitment to staff health and well being is being 
actively promoted through all available forums.
M
EDIUM
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.06.23
IJB.11
21 
Performance  30/07/2021
Oversight of Performance Activity
There is a risk that the  IJB is not provided with adequate or sufficient performance information to enable it to 
discharge its scrutiny and oversight role; make informed decisions and recommend remedial actions to address 
any performance concerns. 
LOW CONTROLS
1. Regular (quarterly) reports on the IJB performance framework, providing updates on areas for improvement, remedial actions (and timescales) 
and updates on performance issues previously reported.
2. Chief Executive Performance Review arrangements.
3. Hosted Services Performance Review arrangements.
4. Sector/Locality Performance Review arrangements.
ACTIONS
1. Request detailed topic based performance reports on specific areas of concern  e.g. CAMHS & Psychological Therapies.
2. Face to face Q3 performance reviews taking place throughout May 23 with sectors/units
low  LOW
Ross M
cGuffie
M
orag Dendy 
SLT, IJB PFA, IJB
31.12.23
IJB.12.
21 
Performance  30/08/2021
Staff Health & Wellbeing
There is a risk to the delivery of the Strategic Commissioning Plan as a result of sustained pressures on staff 
availability due to additional pressures associated with  Covid 19, current sickness abscence levels and potential 
for further staff redeployment due to winter planning contingency arrangements.
medium 
Controls
1. Strategic Staff Health & Wellbeing Committee  established reporting to NLC & NHSL corporate management teams.
2. Range of support services available both nationally and locally e.g Occupational Health, Spiritual care, Psychological Services, national 
wellbeing hub (www.PRoMIS.scot.uk).
3. Rest & Recuperation areas identified.
4. Peer Support Networks established
5. Well established Occupational Health supports available to support staff sickness.
Actions
1. Short Life Working Group for wellbeing with targeted approach for immediate actions including Staff Health & Wellbeing Champions, access to 
online supports, access to Occupational Health Services, helpline established and dedicated resource identified for wellbeing officers to be 
recruited.
2. Funding recieved by Scottish Government specificaly targeting staff well being programmes and supports. Local plans for use of funding being 
developed.
3. Managers supporting & encouraging staff to take planned leave/use full leave allocation
4. Audits of adherence to sickness absence policy being undertaken
HIGH 
low  Ross M
cGuffie
Ross M
cGuffie 
SLT, IJB PFA, IJB, SC&CG, AH&SC 
31.05.23
IJB.13.
2021 
Performance  30.08.21 
Care Homes
Inability of care homes to sustain service due to staffing or Covid outbreaks resulting in closure to new 
placements. This may increase delayed discharge numbers putting additional pressure on acute site capacity and 
impacting on recovery.
The financial support for social care providers during the Covid‐19 pandemic is being reviewed.  Payments in 
respect of under‐occupancy in care homes were extended to 31 October 2021.
High  Controls
1. Establishment of Care Home Assurance Team.
2. Escalation Process in place.
3. National protocol to support discharge of Covid 19 patients in place.
Actions 
1.  Public Health teams providing guidance on infection control.
2. Care Home assurance team undertaking support visits to all care homes & action plans in place for each care home.
3. Staff and visitor testing in place.
4. All care homes advised to use PPE in line with national  addendum.
5. Development day on 12th May 23 to agree structures and approach for year ahead
medium
medium 
Ross M
cGuffie
Trudi M
arshall 
IJB, PF&A, SLT, SC&SC, A H &SC 
31.12.21 
Report Prepared by Stacey Anderson on behalf of the Chief Officer
9

Page 30

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.14.
2022
Strategic & 
Performance 
30.04.22
CAMHS ‐                                                                                                                                   There is a risk that the CAMHS 
service cannot meet the increasing clinical demands due to a significantly high number of cumulative staff 
vacancies for both clinical and non‐clinical posts and challenges recruiting to new posts identified through the 
national recovery and renewal fund.  This is impacting on community, in‐ patient and out‐ patient care with the 
potential to adversely affect response time to referrals; longer waiting times; poorer outcomes; delays in redesign 
and reputation of the IJB. 
Very High 
Controls ‐
1. Prioritisation of referrals; all referrals 1vetted daily with urgent referrals prioritised 
2. Commenced programme of work and implementation of a more structured partnership approach through Choices & Partnership Approach 
(CAPA) service model, with tier 1 & 2 referred through 3rd sector and interfacing with North & South Education Departments
3. Secured significant national investment to fully implement new service model
4. Active review of skill mix to utilise medical staff only when required for highly complex patients
5. Vacancy gap analysis with active recruitment commenced.  Expected to have recruited 75% of gap by end of May 2023
6. Continuous review and validation of the waiting list
Action
1. Incremental implementation of the new service model
2. CAPA appointments begin on 1st May 2023
3. Refurbishment of North Lanarkshire facilities commences early summer 2023
High
medium 
Ross M
cGuffie
M
orag Dendy 
IJB,PF&A, SLT 
31.05.23
IJB.15.
2022
Strategic & 
Performance 
05.09.22
Cost of Living
There is a risk that the IJB's Strategic Commissioning Plan will be unable to be delivered or not have the desired 
impact due to the cost of living rises being faced by residents across North Lanarkshire, leading to a further 
widening of the inequality gap, reduced quality of life and increased health and social care demand due to 
individuals and families having insufficient funds to support basic requirements such as food and heating. 
High CONTROLS
1. NLC Silver command group stood up focused on cost of living
2. NHSL commenced review through CMT
3. Population Health Committee to review activity around cost of living
ACTIONS
1. Survey of NLC hybrid workers to see if home working remains financially viable
2. Business case being developed to expand 'support for people' arrangements used in pandemic to support resident access to welfare rights and 
other supports
3. 3% increase in individual budgets to support service users to maintain current levels of supports at higher cost
4. Recommendation from adult social work, care and wellbeing committee to review all charges to service users and wider cost of living supports 
that could be offered
5. SW Committee approval sought for cost of living contract increases in May 2023
High
M
edium
Ross M
cGuffie
Ross M
cGuffie
SLT, IJB
31.05.23
IJB.16.
2022
Strategic   05.09.22
National Care Service
There is a risk that the ongoing work around a National Care Service could destabilise current service delivery due 
to significant change activity, time demands around the co‐design process, staff uncertainty and partner 
organisations having to focus inwardly due to the impact of change leading to an impact on the ability to deliver 
the significant ongoing change programmes already approved by the IJB and the Strategic Commissioning Plan for 
2023‐26. 
High CONTROLS 
1. NLC establishing NCS working groups
2. Key HSCP leads involved in national developments
3. Ongoing progress updates to IJB and IJB PFA
ACTIONS
1. IJB response submitted on proposed Bill
2. Strong partnership links into working groups at Chief Officers, Chief Finance Officers and Social Work Scotland groups
High
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
31.05.23
IJB.17.
2022
Strategic & 
Performance 
05.09.22
Unscheduled Care
There is a risk that we cannot sustain whole system patient flow through peak winter pressures due to increased 
front door demand; hospital workforce capacity; delays in onward movement of patients due to care home 
capacity/outbreaks and care at home capacity; and community health and social care workforce capacity leading 
to reduced ability to meet 'routine'  and increasing bed demand for more unwell patients, deteriorating delayed 
discharge performance and an inability to recover services. 
Very High
CONTROLS
1. Care Home Assurance Group and associated supports for care homes through liaison service, IPC advice and support, risk assessment for 
onward movement of patients etc
2. Care at Home Assurance group and associated activity to try to support and sustain independent sector provision
3. NHS CMT and Covid response group oversight of performance
4. Daily PDD meetings to review every planned supported discharge and delayed discharge
5. Operation Flow now underway to ensure whole system approach to unscheduled care/delayed discharge challenges
ACTIONS
1. Expansion of Home Support service
2. Roll out of Home Assessment Teams across all 6 Localities by Feb
3. New CSW roles in District Nursing teams to proactively support Care Managed patients
4. Additional Nursing capacity in District Nursing Teams
5. Expansion of Equpiment and Adaptation Service to support rapid access in community
6. Expansion of H@H service (hours of provision as well as moving to support discharges as well as admission prevention)
7. Expansion of Integrated Rehabilitation Teams in all six Localities to support rehab in the community and reduce long‐term service demand
8. 5 Task and Finish groups now established to roll out the key actions agreed through the Operation Flow programme (Phase 2 to be completed 
by Sept 23)
Very High
M
edium
Ross M
cGuffie
Ross M
cGuffie
SLT, IJB PFA, IJB 
28.02.23
Report Prepared by Stacey Anderson on behalf of the Chief Officer
10

Page 31

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 22nd March 2023)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
IJB.18.
2022
Strategic and 
Performance 
05.09.22
Community Alarms
There is a risk that the community alarm system will be destabilised due to the national change from analogue to 
digital telephony by 2025, leading to community alarm users not getting a response when required. 
High CONTROLS
1. Working group established to coordinate all activity
2. Oversight through Home Support Programme Board
3. Reporting to Adult Social Work, Care and Wellbeing Committee
4. Reporting to IJB
ACTIONS
1. NLC Committee approval to purchase 1000 digital alarms so the service can support any imminent changes over to digital in individual areas
2. NLC part of SG once for Scotland procurement process for a new digital alarm receiving centre
3. Communication out to all community alarm service users
4. Instructions issued to all community alarm service users on how to do test calls to ensure alarms are  operational
5. Engagement with telecommunication suppliers to ensure sight of roll out plans across NL
M
edium
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
30.06.23
IJB.19.
2023
Performance 
27/02/2023
Service Sustanability
Due to competing service priorties and workforce/ operational and finacial challenges there is a risk that the IJB 
will be unable to implement the strategic plan/commision plan . Failure to achieve the desired strategic aims of 
the IJB poses a risk on operational service delivery and the achievement of financial balance and patient safety 
High Controls
1. IJB PFA Committee.
2. IJB Chief Officer is a member of each partner's key decision‐making forums.
3. Effective joint working between Chief Financial Officer and both Council and NHS Finance Departments.
4. Regular budget meetings with Chief Executives and Directors of Finance.
5. Regular HSCP budget monitoring meetings across Senior Leadership Team.
6. The IJB Financial Plan is regulary reviewed and agreed.
7. Capacity plans in place  to maximise efficiency.
8. Consultation and involvement with key stakeholders including service users and carers.
9. Joint Strategic Needs Assessment and ongoing move towards preventative and anticipatory approaches.
10. Strategic Planning Group, Locality engagement sessions and Partnership Boards.
11. Effective and ongoing service user engagement, staff consultation and Trade Union liaison at strategic and local levels.
Actions 
1. Sustainability  plans to be reviewed regulalry 
2. Re‐introduction of scruity panels 
3. Improve linkage across all risk registers (tiers 1 to 3, council and NHS) to help ensure areas of concern are identified and 
reviewed regularly. 
4. Review of reporting process into IJB to ensure contionus review of services/ service developments. 
High
Low
Ross McGuffie
Ross McGuffie
SLT, IJB PFA, IJB
31.05.23
IJB.20.
2023
Workforce Sustanability
It is becoming increasingly difficult to recruit to particular roles across Health and Social Care.   Gaps in the 
workforce can result in reduction of service provsion, increase in staff workload and inability to deliver the 
strategic plan. Following EU withdrawl there is  no longer the free movement of labour between the UK and EEA 
countries.  All workers arriving from the EEA and non‐EEA countries are subject to the same immigration rules.  
The new points‐based immigration system makes exceptions for the majority of health care professionals with an 
NHS job offer and for qualified social workers via a new fast‐track visa route, known as the Health and Care 
Worker Visa. There are however no exceptions made for other social care roles, such as care workers.
The Mutual Recognition of Professional Qualifications Directive is an EU‐wide directive that allows professional 
regulators in all member states to automatically recognise professional qualifications.  The UK government has 
decided to continue recognising qualifications gained in the EEA for at least two years after the transition period 
ends.  This however is not a reciprocal and there is no guarantee that qualifications gained in the UK will be 
accepted by professional regulators in EEA nations.
High CONTROLS 
1. All successful Health and Care Worker Visa applicants are exempt from the Immigration Health Surcharge, a one‐off charge levied against 
arriving migrant workers as part of the visa application process.  The system has been designed to make international recruitment into health and 
social care roles more straightforward for employers and employees alike.  These changes to immigration rules are in law as part of the 
Immigration and Social Security Co‐ordination (EU Withdrawal) Act 2020.  As such, from 1 January 2021, they apply to all workers arriving to work 
in the NHS or adult social care.  All workers from EEA nations who are already resident in the UK had until 30 June 2021 to apply for the EU 
Settlement Scheme which will guarantee their right to work in the UK indefinitely.
2. In respect of the mutual recognition of professional qualifications, professional regulatory bodies are working with the UK government to 
review future registration requirements for those with qualifications gained in the EEA and decide what they will be from January 2023.
3. Development of the Care Academy 
4. Dedicated HR support identified in NHSL and NLC to support key priority areas of recruitment such as Mental Health and Home Support
ACTIONS
1. Annual workforce plan being prepared
2. NHSL programme underway to support international recruitment
3. On the day recruitment events being trialled in Home Support
4. Use of university status being explored following positive gains in Podiatry and Psychological Therapies recruitment
High
Medium
Ross McGuffie
Ross McGuffie
SLT, IJB PFA, IJB
31.05.23
Report Prepared by Stacey Anderson on behalf of the Chief Officer
11

Page 32

1
REPORT
Item No: 6
SUBJECT: North Lanarkshire IJB Governance Document Update 2023
TO: IJB
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Author(s) of
Report 
Stacey Anderson Support Services, Project Manager
Stacey Connor Governance Support Manager 
DATE: 17 May 2023
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
For approval ☒ For endorsement ☐ To note ☐
2. ROUTE TO THE BOARD
This paper has been:
Prepared By:
Stacey
Anderson
and Stacey
Connor,  NL
H&SCP
Governance
Team 
☒ Reviewed By: ☐ Endorsed By: ☐

Page 33

2
3. RECOMMENDATIONS
It is recommended that the IJB review the updated IJB Governance documents and
approve the documents and associated templates for IJB use during the 2023-24
period. 
4. VARIATIONS TO DIRECTIONS?
5. BACKGROUND/SUMMARY OF KEY ISSUES
The report provides an overview of the recently reviewed/updated governance
documents in regards to reporting for the North Lanarkshire Integration Joint Board.
It is a requirement of the Integration Joint Board to ensure that they are compliant
with The Public Bodies (Joint Working) (Prescribed Health Board Functions)
(Scotland) Regulations 2014). A continuous review of the IJB governance
documents/policy will commence across the financial year with updates regularly
being provided to the IJB.
The report focuses on the governance surrounding the IJB Programme of Reports,
EQIA Process, Code of Conduct and Declaration of Interest, Directions, IJB Risk
Reporting Process and Risk Reporting Template. 
6. CONCLUSIONS
Yes  ☐ No ☐ N/A ☒

Page 34

3
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☐
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
7.2 ASSOCIATED MEASURE(S)
7.3 FINANCIAL
This paper has been reviewed by Finance:
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Choose an item.
Yes  ☐ No ☒ N/A ☐

Page 35

4
7.5  ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken.
Objectives  Further Details
☒ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
☐ Provide stakeholders with information on
how to get involved
☐ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☐ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
☐ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
☐ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff
☐ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes  ☐ No ☐ N/A ☒

Page 36

5
EQIA added to website: 
8. BACKGROUND PAPERS
None. 
9. APPENDICES
Governance Report
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Members seeking further information about any aspect of this report, please contact
Stacey Anderson 07976801913.
Yes /
Date
added
☐ No ☐ N/A ☒

Page 37

6
ABSTRACT

Page 38

7
Contents 
1. Introduction ................................................................................................................................ 8
2. IJB Programme of Reports ..................................................................................................... 8
3. EQIA Process ........................................................................................................................... 8
4. Code of Conduct and Declaration of Interest ....................................................................... 9
5. Directions ................................................................................................................................... 9
6. IJB Risk Register Process Quarterly Report ...................................................................... 10
7. IJB Reporting Template ......................................................................................................... 10

Page 39

8
1. Introduction
This report provides an overview of the recently reviewed/updated governance
documents in regards to reporting for the North Lanarkshire Integration Joint Board.
It is a requirement of the Integration Joint Board to ensure that they are compliant
with The Public Bodies (Joint Working) (Prescribed Health Board Functions)
(Scotland) Regulations 2014). A continuous review of the IJB governance
documents/policy will commence across the financial year with updates regularly
being provided to the IJB.
2. IJB Programme of Reports
Following approval of revised terms of references of the Integrated Joint Board
Performance Finance and Audit Committee a review of what papers/ reports are
presented to which group was undertaken and a draft programme of reports has
been developed to help provide both groups an overview of what papers will be
presented to which group and when. 
In summary any update or governance reporting in regards to financial or
service/project performance will be presented to the IJB PFA and any new
developments/ projects, overview reports and overall IJB Governance will be
presented at the IJB.  A link to the minutes of the IJB PFA will be added to the
agenda of the IJB for any further member discussion. 
The draft programme of reports will be circulated around the membership group at
the start of each financial year. As this will be a fluid document with regular changes
and developments, a copy of the programme of reports will be added to the end of
the agendas for the IJB PFA and IJB to provide clarity to the board and show any
changes to the reporting schedule.  
Appendix 1 Programme of Reports 1
3. EQIA Process
As per the Equality Act 2010, EQIAs should be carried out when developing or
reviewing current policies, strategies, services and functions to ensure that the
policy, project or scheme does not unlawfully discriminate against any protected
characteristics. 
Integration Joint Boards are required to: 
 use equality evidence to assess the impact of health and social care services
of different people’s lives
 For all protected groups, consider if and how the service will be non-
discriminatory, advance equality of opportunity and foster good relations

Page 40

9
 Take the results of the assessment into account when developing and
agreeing what the service will look like
 Publish the results.
In order to ensure that the IJB comply with the equality’s act, the North Lanarkshire
Integrated Joint Board EQIA Process has been developed. The process details what
the process that those presenting documents to the IJB / IJB PFA should follow in
terms of EQIA, the governance process that the IJB / IJB PFA should follow to
ensure that EQIAs are being considered and reviewed and details how the IJB / IJB
PFA will publish the EQIAs on the IJB website North Lanarkshire Health and Social
Care Partnership (hscnl.org.uk). 
Appendix 2 EQIA
4. Code of Conduct and Declaration of Interest
As part of the risk measure for risk associated with fraud a review of the IJB Code of
Conduct has taken place with the main change to the code of conduct being around
how declarations of interest are submitted to the IJB. The proposed change is that all
members are asked to submit an annual IJB declarations of interest form, with the
form having a clearer focus on the nine categories that are listed within the Code of
Conduct. 
The completed declarations of interest forms will then be uploaded to the IJB website
North Lanarkshire Health and Social Care Partnership (hscnl.org.uk) and a register
of interests including gifts and hospitality received by members will be held by the
IJB administration team. 
Appendix 3 Code of Conduct 
5. Directions
In January 2020, the Scottish Government issued Statutory Guidance on Directions
from Integration Authorities to Health Boards and Local Authorities.
The North Lanarkshire Joint Board must issue a direction in respect of every function
that has been delegated to it by NHS Lanarkshire and North Lanarkshire Council
which must provide relevant budget information.
Directions are the means by which the IJB informs the Health Board and the Local
Authority what is to be delivered using the integrated budget and for the IJB to

Page 41

10
improve the quality and sustainability of care, as outlined in its strategic
commissioning plan. Directions are also the legal basis on which the Health Board
and Local Authority deliver services that are under the control of the IJB.
To help ensure that the North Lanarkshire Integration Joint Board implements the
Statutory Guidance on Directions, a North Lanarkshire Integration Joint Board
Directions Policy has been created. 
The policy details what directions are, how and when directions should be issued
and how directions should be implemented and monitored.  The policy also provides
a Directions template for the IJB to use and add to each paper when directions are
issued. 
Appendix 4 IJB Directions Policy
6. IJB Risk Register Process Quarterly Report
The IJB Risk Register strategy was approved by the IJB at the March 2023 meeting.
In order to ensure that the IJB Risk Register is following the strategy and also
mirroring the risk reporting process utilised by NHS Lanarkshire, a new IJB Risk
Register report template has been developed.
The report template helps provide an overview of the risk register in a more user
friendly graphic format with the aim of clearly showcasing the risk data, highlighting
the risks held within the council, NHS and IJB and ensuring that risks are
continuously reviewed and updated. 
Appendix 5 Risk Register 
7. IJB Reporting Template
To help support authors submitting items to the IJB, a new IJB Reporting Template
has been developed. The report template for the IJB now has a greater focus on
EQIAs, Risk, Participation and Engagement, National Outcomes and Directions. The
aim of this template is for the author to ensure that they have considered all relevant
elements before submitting items to the IJB and to provide the IJB committee
assurance that these key elements have been considered during publication of the
paper/ service review etc. In order to support authors completing the reporting
template, the IJB Reporting Template Guidance has also been developed. 
Appendix 6 IJb Reports Template
Appendix 7 IJb Report Template Guidance

Page 42

11
Direction from North Lanarkshire Integration Joint Board (IJB)
1 Reference Number
2 Report Title
3 Date direction issued by IJB
4 Date from which direction
takes effect
5 Direction to:
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s)
7 Functions covered by
direction
8 Full text of direction
9 Budget allocated by
Integration Joint Board to
carry out direction
10 Performance Management /
Governance arrangements
11 Date direction will be
reviewed

Page 43

Reporting Cycle Title Description Category Progress Priority Start date Due date Assigned to Notes Item Type Path
IJB Quarterly Financial monitoring report 
Quarterly 
financial 
monitoring 
report 
Planning Not started Quarterly  Item
sites/IJB280/L
ists/Progress 
tracker list
IJB Quarterly Quarterly Risk Register Update  Not started Quarterly  Item
sites/IJB280/L
ists/Progress 
tracker list
IJB March Website Update Report  Not started
IJB March Delivering for communities‐ engagement and participation ‐ Update  Not started
IJB March Chryston Community Health Clinic Update  Not started
IJB March Ethical Commissioning Report  Not started
IJB March Chief Social Work Officer (CSWO) Annual Report  Not started
IJB March IJB Directions Report  Not started
IJB March Category 1 Responders ‐ Update  Not started
IJB March Update on mental health and wellbeing strategy  Not started
IJB May Winter Plan ‐ Draft  Not started
IJB May National Care Services Bill ‐ Update  Not started
IJB May Tackling Poverty  Not started
IJB May Sustainability Plan Not started
IJB May IJB Self Assessment Report 
IJB May Fairer Scotland duty update report 
IJB May Our Lives
IJB September Investment in IT Infrastructure to support care delivery‐ Update  Not started
IJB September Action for Children ‐ North Lanarkshire Young Careers Review  Not started
IJB September Climate Change Report 2023 Not started
IJB September Winter Plan Update  Not started
IJB September Internal Audit Annual Report  Not started
IJB September Lanarkshire Primary Care Out of Hours Service ‐ Review/Update  Not started
IJB September CAMHS Report Not started
IJB September North Lanarkshire ADP Self‐ Assessment Not started
IJB September Annual Whistleblowing Report 
IJB September Quality Assurance Update / Annual Report  Not started
IJB November  External Auditor Annual Report  Not started
IJB November  Annual Accounts Audited  Not started
IJB November  Evaluation of Strategic Plan  Not started
Potential Reports Communications Strategy  potential report  Not started potential 
reports
Potential Reports Falls Strategy  Not started potential 
reports
Potential Reports Workforce Plan  Not started potential 
reports
Potential Reports Business Continuity Assurance  Not started potential 
reports
Potential Reports Adult Protection  Not started potential 
reports
Potential Reports Home Support Not started potential 
reports
Potential Reports Cost of living helpline review  Not started potential 
reports
Potential Reports mental health hospital based clinical complex care  Not started potential 
reports
Potential Reports supporting unpaid careers  Not started potential 
reports
Potential Reports Inpatient Mental Health Service Annual Review 
Potential Reports Psychological Services Annual Review 
Potential Reports Paediatrics Annual Review 
Potential Reports Dietetics Annual Review 
Potential Reports HMP Shotts Annual Review 
Potential Reports Custody HealthCare 
Potential Reports MAT Standards Update
Potential Reports Financial Regulations 
IJB PFA Quarterly  Financial monitoring report 
Quarterly 
financial 
monitoring 
report 
Planning Not started Quarterly 
IJB PFA Quarterly  Quarterly Risk Register Update  Not started Quarterly 
IJB PFA Quarterly  PFA Risk Register  Not started Quarterly 
IJB PFA Quarterly  Resilience Update  Quarterly 
IJB PFA Quarterly  Performance Update 
IJB PFA February  Maintaining a Positive Balance of Care Update 
IJB PFA February  Financial Regulations 
IJB PFA February  Annual Performance Report 
IJB PFA February  MAT standards update 
IJB PFA February  NSS Screening 
IJB PFA February  Cancer Inequalities 
IJB PFA April Mental Health Strategy Update  Potential a 
forum session 
IJB PFA April IJB self‐ assessment report 
IJB PFA April Whole system performance for North Lanarkshire ‐ Update 
IJB PFA April Speech and Language Therapy Update 
IJB PFA April OT Pads Update 
IJB PFA April Digital Alarms
IJB PFA June Specialist Children's Health Service  Annual 
Update 
IJB PFA June Adult Health Service  Annual 
Update 
IJB PFA June Adult Social Work  Annual 
Update 
IJB PFA June Infection Control  Annual 
Update 
IJB PFA June Public Protection  Annual 
Update 
IJB PFA June Health Technologies Annual 
Update 
IJB PFA June HMP Shotts Annual 
Update 
IJB PFA June Prescribing  Annual 
Update 
Appendix 1
12

Page 44

IJB PFA June Equality Outcomes and Mainstreaming Report update  Bi‐Annually
IJB PFA October Analogue to digital telecare transition update 
IJB PFA October Primary Care improvement plan update 
IJB PFA October Integration Review 
IJB PFA October ADP Self‐ Assessment 
IJB PFA October Service Recovery/ Winter Planning and supporting the health and social care system 
13

Page 45

North Lanarkshire Integrated Joint Board: Process for Equality Impact
Assessments (EQIAs). 
Version No:           
Prepared By:         
Effective From:      
Next Review Date: 
Lead Reviewer:      
Dissemination Arrangements:

Appendix 2
14

Page 46

2
Content
1.0 Purpose ........................................................................................................... 3
2.0 Scope ............................................................................................................... 3
3.0 Procedure ........................................................................................................ 3
3.2 Useful Information: ........................................ Error! Bookmark not defined.
15

Page 47

3
1.0 Purpose 
The aim of the document is to detail the process followed by the North Lanarkshire
Integrated Joint Board (IJB) or the IJB Performance, Finance and Audit Committee
(PIJB PFA) in regards to Equality Impact Assessments (EQIA). 
2.0 Scope
As per the Equality Act 2010, EQIAs should be carried out when developing or
reviewing current policies, strategies, services and functions to ensure that the policy,
project or scheme does not unlawfully discriminate against any protected
characteristics. 
Integrated Joint Boards are required to: 
 use equality evidence to assess the impact of health and social care services
of different people’s lives
 For all protected groups, consider if and how the service will be non-
discriminatory, advance equality of opportunity and foster good relations
 Take the results of the assessment into account when developing and
agreeing what the service will look like
 Publish the results.
3.0 Procedure 
3.1 When a paper/report is submitted to the IJB or IJB PFA, the author must
ensure that the IJB reporting template has been used. 
3.2 The author of the paper/ report must complete section 7.6
INEQUALITIES AND FAIRER SCOTLAND DUTY of the IJB reporting
template, detailing if they have completed an EQIA, attached a copy of
the EQIA to the paper/ report and if the EQIA has already been
published on the IJB website. 
3.3 If section 7.6 of the reporting template is not completed and/or if a copy
of the EQIA has not been attached to the report, the North Lanarkshire
Health and Social Care Partnership (NL H&SCP) Governance Team will
highlight this to the author of the paper/ report and if not received in time
for the IJB, the governance team will notify the Chair of the IJB / IJB PFA
and a decision will be made by the chair as to whether or not the
paper/report will be presented without the EQIA. 
3.4 The IJB/ IJB PFA should review the EQIAs and issue any associated
directions relating to the EQIA as per the IJB Directions Policy.  All
directions will be recorded on the IJB Directions Tracker as per policy.
3.5 Once the paper/report and associated EQIA has been approved by the
IJB/ IJB PFA, the NL H&SCP Governance Team will follow the relevant
procedures to ensure that the relevant documents are added to the
website (if this has not already been completed by the author). 
3.6 The NL H&SCP will also record on the IJB/ IJB PFA paper tracker the
date that the paper/report and EQIA was approved by the IJB/ IJB PFA
and the date in which the EQIA was added to the website for audit
purposes. 
16

Page 48

17
Appendix 3
Code of Conduct for Members of:
NORTH LANARKSHIRE
INTEGRATION JOINT BOARD
Version Control Date Summary of Changes
1 2022
2 2023

Page 49

18 
CONTENTS 
Section 1: Introduction to the Code of Conduct
My Responsibilities
Enforcement
Section 2:  Key Principles of the Code of Conduct
Section 3:   General Conduct
Respect and Courtesy
Remuneration, Allowances and Expenses
Gifts and Hospitality
Confidentiality
Use of Public Body Resources
Dealing with my Public Body and Preferential Treatment
Appointments to Outside Organisations
Section 4:  Registration of Interests
Category One: Remuneration
Category Two: Other Roles
Category Three: Contracts
Category Four: Election Expenses
Category Five: Houses, Land and Buildings
Category Six: Interest in Shares and Securities
Category Seven: Gifts and Hospitality
Category Eight: Non–Financial Interests
Category Nine: Close Family Members
Section 5:   Declaration of Interests
Stage 1: Connection
Stage 2: Interest
Stage 3: Participation
Section 6:  Lobbying and Access
ANNEXES
Annex A Breaches of the Code
Annex B  Definitions

Page 50

19 
APPENDIX
Appendix 1       Register of Interest Form

Page 51

20 
SECTION 1: INTRODUCTION TO THE CODE OF CONDUCT
1.1 This Code has been issued by the Scottish Ministers, with the approval of
the Scottish Parliament, as required by the Ethical Standards in Public Life etc.
(Scotland) Act 2000 (the “Act”).
1.2 The purpose of the Code is to set out the conduct expected of those who
serve on the boards of public bodies in Scotland. 
1.3 The Code has been developed in line with the nine key principles of public life
in Scotland. The principles are listed in Section 2 and set out how the provisions of the
Code should be interpreted and applied in practice. 
My Responsibilities
1.4 I understand that the public has a high expectation of those who serve on the
boards of public bodies and the way in which they should conduct themselves in
undertaking their duties. I will always seek to meet those expectations by ensuring
that I conduct myself in accordance with the Code.
1.5 I will comply with the substantive provisions of this Code, being sections 3 to 6
inclusive, in all situations and at all times where I am acting as a board member of my
public body, have referred to myself as a board member or could objectively be
considered to be acting as a board member.
1.6 I will comply with the substantive provisions of this Code, being sections 3 to 6
inclusive, in all my dealings with the public, employees and fellow board members,
whether formal or informal.
1.7 I understand that it is my personal responsibility to be familiar with the
provisions of this Code and that I must also comply with the law and my public body’s
rules, standing orders and regulations. I will also ensure that I am familiar with any
guidance or advice notes issued by the Standards Commission for Scotland
(“Standards Commission”) and my public body, and endeavour to take part in any
training offered on the Code.
1.8 I will not, at any time, advocate or encourage any action contrary to this Code. 
1.9 I understand that no written information, whether in the Code itself or the
associated Guidance or Advice Notes issued by the Standards Commission, can
provide for all circumstances. If I am uncertain about how the Code applies, I will seek
advice from   the Standards Officer of my public body, failing whom the Chair or Chief
Officer of my public body. I note that I may also choose to seek external legal advice
on how to interpret the provisions of the Code.  
Enforcement
1.10  Part 2 of the Act sets out the provisions for dealing with alleged breaches of
the Code, including the sanctions that can be applied if the Standards Commission
finds that there has been a breach of the Code.  More information on how complaints
are dealt with and the sanctions available can be found at Annex A.

Page 52

21 
SECTION 2: KEY PRINCIPLES OF THE MODEL CODE OF CONDUCT
2.1 The Code has been based on the following key principles of public life. I will
behave in accordance with these principles and understand that they should be used
for guidance and interpreting the provisions in the Code.
2.2 I note that a breach of one or more of the key principles does not in itself
amount to a breach of the Code. I note that, for a breach of the Code to be found,
there must also be a contravention of one or more of the provisions in sections 3 to 6
inclusive of the Code.
The key principles are:
Duty
I have a duty to uphold the law and act in accordance with the law and the public
trust placed in me.  I have a duty to act in the interests of the public body of which
I am a member and in accordance with the core functions and duties of that body.
Selflessness
I have a duty to take decisions solely in terms of public interest. I must not act in
order to gain financial or other material benefit for myself, family or friends.
Integrity
I must not place myself under any financial, or other, obligation to any individual or
organisation that might reasonably be thought to influence me in the performance of
my duties.
Objectivity
I must make decisions solely on merit and in a way that is consistent with the
functions of my public body when carrying out public business including making
appointments, awarding contracts or recommending individuals for rewards and
benefits.
Accountability and Stewardship
I am accountable to the public for my decisions and actions. I have a duty to
consider issues on their merits, taking account of the views of others and I must
ensure that my public body uses its resources prudently and in accordance with
the law.
Openness
I have a duty to be as open as possible about my decisions and actions, giving
reasons for my decisions and restricting information only when the wider public
interest clearly demands.
Honesty
I have a duty to act honestly. I must declare any private interests relating to my
public duties and take steps to resolve any conflicts arising in a way that protects
the public interest.
Leadership
I have a duty to promote and support these principles by leadership and example,
and to maintain and strengthen the public’s trust and confidence in the integrity of
my public body and its members in conducting public business.

Page 53

22 
Respect
I must respect all other board members and all employees of my public body and
the role they play, treating them with courtesy at all times. Similarly, I must respect
members of the public when performing my duties as a board member.

Page 54

23 
SECTION 3: GENERAL CONDUCT
Respect and Courtesy
3.1 I will treat everyone with courtesy and respect. This includes in person,
in writing, at meetings, when I am online and when I am using social media.
3.2 I will not discriminate unlawfully on the basis of race, age, sex, sexual
orientation, gender reassignment, disability, religion or belief, marital status or
pregnancy/maternity; I will advance equality of opportunity and seek to foster
good relations between different people.
3.3 I will not engage in any conduct that could amount to bullying or harassment
(which includes sexual harassment). I accept that such conduct is completely 
unacceptable and will be considered to be a breach of this Code.
3.4 I accept that disrespect, bullying and harassment can be:
a) a one-off incident,
b) part of a cumulative course of conduct; or
c) a pattern of behaviour.
3.5 I understand that how, and in what context, I exhibit certain behaviours can
be as important as what I communicate, given that disrespect, bullying and
harassment can be physical, verbal and non-verbal conduct.
3.6 I accept that it is my responsibility to understand what constitutes bullying
and harassment and I will utilise resources, including the Standards Commission’s
guidance and advice notes, my public body’s policies and training material (where
appropriate) to ensure that my knowledge and understanding is up to date.
3.7 Except where it is written into my role as Board member, and / or at the
invitation of the Chief Officer, I will not become involved in operational management
of my public body. I acknowledge and understand that operational management is
the responsibility of the Chief Officer and Management Team.
3.8 I will not undermine any individual employee or group of employees, or raise
concerns about their performance, conduct or capability in public. I will raise any
concerns I have on such matters in private with senior management as appropriate. 
3.9 I will not take, or seek to take, unfair advantage of my position in my dealings
with employees of my public body or bring any undue influence to bear on
employees to take a certain action. I will not ask or direct employees to do something
which I know, or should reasonably know, could compromise them or prevent them
from undertaking their duties properly and appropriately.
3.10 I will respect and comply with rulings from the Chair during meetings of:
a) my public body, its committees; and
b) any outside organisations that I have been appointed or nominated to by
my public body or on which I represent my public body.
IJBs can opt out of this paragraph when adopting their Code.

Page 55

24 
3.11 I will respect the principle of collective decision-making and corporate  
responsibility. This means that once the Board has made a decision, I will support that
decision, even if I did not agree with it or vote for it.
Remuneration, Allowances and Expenses
3.12 I will comply with the rules, and the policies of my public body, on the payment
of remuneration, allowances and expenses.
Gifts and Hospitality
3.13 I understand that I may be offered gifts (including money raised via
crowdfunding or sponsorship), hospitality, material benefits or services (“gift or
hospitality”) that may be reasonably regarded by a member of the public with
knowledge of the relevant facts as placing me under an improper obligation or being
capable of influencing my judgement.
3.14 I will never ask for or seek any gift or hospitality.
3.15 I will refuse any gift or hospitality, unless it is:
a) a minor item or token of modest intrinsic value offered on an infrequent
basis;
b) a gift being offered to my public body;
c) hospitality which would reasonably be associated with my duties as a
board member; or
d) hospitality which has been approved in advance by my public body.
3.16 I will consider whether there could be a reasonable perception that any gift or 
hospitality received by a person or body connected to me could or would influence my
judgement.
3.17 I will not allow the promise of money or other financial advantage to induce 
me to act improperly in my role as a board member. I accept that the money or 
advantage (including any gift or hospitality) does not have to be given to me directly. 
The offer of monies or advantages to others, including community groups, may amount 
to bribery, if the intention is to induce me to improperly perform a function.
3.18 I will never accept any gift or hospitality from any individual or applicant who 
is awaiting a decision from, or seeking to do business with, my public body.
3.19 If I consider that declining an offer of a gift would cause offence, I will accept 
it and hand it over to my public body at the earliest possible opportunity and ask for it 
to be registered.
3.20 I will promptly advise my public body’s Standards Officer if I am offered (but 
refuse) any gift or hospitality of any significant value and / or if I am offered any gift 
or hospitality from the same source on a repeated basis, so that my public body can 
monitor this.
3.21 I will familiarise myself with the terms of the Bribery Act 2010, which provides
for offences of bribing another person and offences relating to being bribed.

Page 56

25 
Confidentiality
3.22 I will not disclose confidential information or information which should
reasonably be regarded as being of a confidential or private nature, without the
express consent of a person or body authorised to give such consent, or unless
required to do so by law. I note that if I cannot obtain such express consent, I
should assume it is not given.
3.23 I accept that confidential information can include discussions, documents,
and information which is not yet public or never intended to be public, and
information deemed confidential by statute.
3.24 I will only use confidential information to undertake my duties as a board
member. I will not use it in any way for personal advantage or to discredit my public
body (even if my personal view is that the information should be publicly available). 
3.25 I note that these confidentiality requirements do not apply to protected
whistleblowing disclosures made to the prescribed persons and bodies as identified
in statute.
Use of Public Body Resources
3.26 I will only use my public body’s resources, including employee assistance,
facilities, stationery and IT equipment, for carrying out duties on behalf of the public
body, in accordance with its relevant policies.
3.27 I will not use, or in any way enable others to use, my public body’s
resources:
a) imprudently (without thinking about the implications or consequences);
b) unlawfully;
c) for any political activities or matters relating to these; or
d) improperly.
Dealing with my Public Body and Preferential Treatment
3.28 I will not use, or attempt to use, my position or influence as a board member 
to:
a) improperly confer on or secure for myself, or others, an advantage;
b) avoid a disadvantage for myself, or create a disadvantage for others or
c) improperly seek preferential treatment or access for myself or others.
3.29 I will avoid any action which could lead members of the public to believe that
preferential treatment or access is being sought.
3.30  I will advise employees of any connection, as defined at Section 5, I may
have to a matter, when seeking information or advice or responding to a request for
information or advice from them.

Page 57

26 
Appointments to Outside Organisations
3.31 If I am appointed, or nominated by my public body, as a member of
another body or organisation, I will abide by the rules of conduct and will act in the
best interests of that body or organisation while acting as a member of it. I will
also continue to observe the rules of this Code when carrying out the duties of
that body or organisation.
3.32 I accept that if I am a director or trustee (or equivalent) of a company or a
charity, I will be responsible for identifying, and taking advice on, any conflicts of
interest that may arise between the company or charity and my public body.

Page 58

27 
SECTION 4: REGISTRATION OF INTERESTS
4.1 The following paragraphs set out what I have to register when I am
appointed and whenever my circumstances change. The register covers my
current term of appointment. 
4.2 I understand that regulations made by the Scottish Ministers describe the
detail and timescale for registering interests; including a requirement that a board
member must register their registrable interests within one month of becoming a
board member, and register any changes to those interests within one month of
those changes having occurred. A copy of the registering of interest form is
detailed within Appendix 1. 
4.3 The interests which I am required to register are those set out in the
following paragraphs. Other than as required by paragraph 4.23, I understand it
is not necessary to register the interests of my spouse or cohabitee.
Category One: Remuneration
4.4  I will register any work for which I receive, or expect to receive, payment.
I have a registrable interest where I receive remuneration by virtue of being:  
a) employed;
b) self-employed;
c) the holder of an office;
d) a director of an undertaking;
e) a partner in a firm;
f) appointed or nominated by my public body to another body; or
g) engaged in a trade, profession or vocation or any other work.
4.5 I understand that in relation to 4.4 above, the amount of remuneration does
not require to be registered. I understand that any remuneration received as a board
member of this specific public body does not have to be registered.
4.6 I understand that if a position is not remunerated it does not need to be
registered under this category. However, unremunerated directorships may need to
be registered under Category Two, “Other Roles”.
4.7 I must register any allowances I receive in relation to membership of
any organisation under Category One.
4.8 When registering employment as an employee, I must give the full
name of the employer, the nature of its business, and the nature of the post I
hold in the organisation.
4.9 When registering remuneration from the categories listed in paragraph
4.4 (b) to (g) above, I must provide the full name and give details of the nature of
the business, organisation, undertaking, partnership or other body, as
appropriate. I recognise that some other employments may be incompatible with
my role as board member of my public body in terms of paragraph 6.7 of this
Code.

Page 59

28 
4.10 Where I otherwise undertake a trade, profession or vocation, or any
other work, the detail to be given is the nature of the work and how often it is
undertaken. 
4.11 When registering a directorship, it is necessary to provide the registered
name and registered number of the undertaking in which the directorship is held
and provide information about the nature of its business.
4.12 I understand that registration of a pension is not required as this falls
outside the scope of the category.
Category Two: Other Roles
4.13 I will register any unremunerated directorships where the body in
question is a subsidiary or parent company of an undertaking in which I hold a
remunerated directorship.
4.14 I will register the registered name and registered number of the subsidiary
or parent company or other undertaking and the nature of its business, and its
relationship to the company or other undertaking in which I am a director and from
which I receive remuneration.
Category Three: Contracts
4.15 I have a registerable interest where I (or a firm in which I am a partner, or
an undertaking in which I am a director or in which I have shares of a value as
described in paragraph 4.19 below) have made a contract with my public body:
a) under which goods or services are to be provided, or works are to be
executed; and
b) which has not been fully discharged.
4.16 I will register a description of the contract, including its duration, but
excluding the value.
Category Four: Election Expenses
4.17 If I have been elected to my public body, then I will register a description
of, and statement of, any assistance towards election expenses relating to
election to my public body.
Category Five: Houses, Land and Buildings
4.18 I have a registrable interest where I own or have any other right or interest
in houses, land and buildings, which may be significant to, of relevance to, or bear
upon, the work and operation of my public body.

Page 60

29 
4.19 I accept that, when deciding whether or not I need to register any interest I
have in houses, land or buildings, the test to be applied is whether a member of the
public, with knowledge of the relevant facts, would reasonably regard the interest
as being so significant that it could potentially affect my responsibilities to my public
body and to the public, or could influence my actions, speeches or decision-
making.
Category Six: Interest in Shares and Securities
4.20 I have a registerable interest where:
a) I own or have an interest in more than 1% of the issued share capital
of the company or other body; or
b) Where, at the relevant date, the market value of any shares and
securities (in any one specific company or body) that I own or have an
interest in is greater than £25,000.
Category Seven: Gifts and Hospitality
4.21 I understand the requirements of paragraphs 3.13 to 3.21 regarding gifts and
hospitality. As I will not accept any gifts or hospitality, other than under the limited
circumstances allowed, I understand there is no longer the need to register any.   
Category Eight: Non–Financial Interests
4.22 I may also have other interests and I understand it is equally important that
relevant interests such as membership or holding office in other public bodies,
companies, clubs, societies and organisations such as trades unions and voluntary
organisations, are registered and described. In this context, I understand non-
financial interests are those which members of the public with knowledge of the
relevant facts might reasonably think could influence my actions, speeches, votes
or decision-making in my public body (this includes its Committees and
memberships of other organisations to which I have been appointed or nominated
by my public body).
Category Nine: Close Family Members
4.23 I will register the interests of any close family member who has transactions
with my public body or is likely to have transactions or do business with it.

Page 61

30 
SECTION 5: DECLARATION OF INTERESTS
Stage 1: Connection
5.1 For each particular matter I am involved in as a board member, I will first
consider whether I have a connection to that matter. 
5.2 I understand that a connection is any link between the matter being
considered and me, or a person or body I am associated with. This could be a
family relationship or a social or professional contact.
5.3 A connection includes anything that I have registered as an interest. 
5.4 A connection does not include being a member of a body to which I
have been appointed or nominated by my public body as a representative of my
public body, unless:
a) The matter being considered by my public body is quasi-judicial or
regulatory; or
b) I have a personal conflict by reason of my actions, my connections or
my legal obligations.
Stage 2: Interest
5.5 I understand my connection is an interest that requires to be declared where
the objective test is met – that is where a member of the public with knowledge of the
relevant facts would reasonably regard my connection to a particular matter as being
so significant that it would be considered as being likely to influence the discussion
or decision-making.
Stage 3: Participation
5.6 I will declare my interest as early as possible in meetings. I will not remain in
the meeting nor participate in any way in those parts of meetings where I have
declared an interest.
5.7 I will consider whether it is appropriate for transparency reasons to state
publicly where I have a connection, which I do not consider amounts to an interest.
5.8 I note that I can apply to the Standards Commission and ask it to grant a
dispensation to allow me to take part in the discussion and decision-making on a
matter where I would otherwise have to declare an interest and withdraw (as a result
of having a connection to the matter that would fall within the objective test). I note
that such an application must be made in advance of any meetings where the
dispensation is sought and that I cannot take part in any discussion or decision-
making on the matter in question unless, and until, the application is granted.
5.9 I note that public confidence in a public body is damaged by the perception
that decisions taken by that body are substantially influenced by factors other than
the public interest.  I will not accept a role or appointment if doing so means I will
have to declare interests frequently at meetings in respect of my role as a board
member.  Similarly, if any appointment or nomination to another body would give rise
to objective concern because of my existing personal involvement or affiliations, I will
not accept the appointment or nomination.

Page 62

31 
SECTION 6: LOBBYING AND ACCESS
6.1 I understand that a wide range of people will seek access to me as a board
member and will try to lobby me, including individuals, organisations and companies.
I must distinguish between:
a) any role I have in dealing with enquiries from the public;
b) any community engagement where I am working with individuals and
organisations to encourage their participation and involvement, and;
c) lobbying, which is where I am approached by any individual or
organisation who is seeking to influence me for financial gain or
advantage, particularly those who are seeking to do business with my
public body (for example contracts/procurement).
6.2 In deciding whether, and if so how, to respond to such lobbying, I will always
have regard to the objective test, which is whether a member of the public, with
knowledge of the relevant facts, would reasonably regard my conduct as being likely
to influence my, or my public body’s, decision-making role. 
6.3 I will not, in relation to contact with any person or organisation that lobbies,
do anything which contravenes this Code or any other relevant rule of my public body
or any statutory provision.
6.4 I will not, in relation to contact with any person or organisation that lobbies,
act in any way which could bring discredit upon my public body.
6.5 If I have concerns about the approach or methods used by any person or
organisation in their contacts with me, I will seek the guidance of the Chair, Chief
Officer or Standards Officer of my public body.
6.6 The public must be assured that no person or organisation will gain better
access to, or treatment by, me as a result of employing a company or individual to
lobby on a fee basis on their behalf. I will not, therefore, offer or accord any
preferential access or treatment to those lobbying on a fee basis on behalf of clients
compared with that which I accord any other person or organisation who lobbies or
approaches me. I will ensure that those lobbying on a fee basis on behalf of clients
are not given to understand that preferential access or treatment, compared to that
accorded to any other person or organisation, might be forthcoming.
6.7 Before taking any action as a result of being lobbied, I will seek to satisfy
myself about the identity of the person or organisation that is lobbying and the
motive for lobbying. I understand I may choose to act in response to a person or
organisation lobbying on a fee basis on behalf of clients but it is important that I
understand the basis on which I am being lobbied in order to ensure that any
action taken in connection with the lobbyist complies with the standards set out in
this Code and the Lobbying (Scotland) Act 2016.

Page 63

32 
6.8 I will not accept any paid work:
a) which would involve me lobbying on behalf of any person or
organisation or any clients of a person or organisation.
b) to provide services as a strategist, adviser or consultant, for example,
advising on how to influence my public body and its members.  This
does not prohibit me from being remunerated for activity which may
arise because of, or relate to, membership of my public body, such as
journalism or broadcasting, or involvement in representative or
presentational work, such as participation in delegations, conferences or
other events.

Page 64

33 
ANNEX A: BREACHES OF THE CODE
Introduction
1. The Ethical Standards in Public Life etc. (Scotland) Act 2000 (“the Act”) provided for
a framework to encourage and, where necessary, enforce high ethical standards in
public life.
2. The Act provided for the introduction of new codes of conduct for local authority
councillors and members of relevant public bodies, imposing on councils and
relevant public bodies a duty to help their members comply with the relevant code.
3. The Act and the subsequent Scottish Parliamentary Commissions and
Commissioners etc. Act 2010 established the Standards Commission for Scotland
(“Standards Commission”) and the post of Commissioner for Ethical Standards in
Public Life in Scotland (“ESC”).
4. The Standards Commission and ESC are separate and independent, each with
distinct functions.  Complaints of breaches of a public body’s Code of Conduct are
investigated by the ESC and adjudicated upon by the Standards Commission.
5. The first Model Code of Conduct came into force in 2002. The Code has since been
reviewed and re-issued in 2014. The 2021 Code has been issued by the Scottish
Ministers following consultation, and with the approval of the Scottish Parliament, as
required by the Act.
Investigation of Complaints
6. The ESC is responsible for investigating complaints about members of devolved
public bodies. It is not, however, mandatory to report a complaint about a potential
breach of the Code to the ESC. It may be more appropriate in some circumstances
for attempts to be made to resolve the matter informally at a local level.
7. On conclusion of the investigation, the ESC will send a report to the Standards
Commission.
Hearings
8. On receipt of a report from the ESC, the Standards Commission can choose to:
 Do nothing;
 Direct the ESC to carry out further investigations; or
 Hold a Hearing.
9. Hearings are held (usually in public) to determine whether the member concerned
has breached their public body’s Code of Conduct.  The Hearing Panel comprises of
three members of the Standards Commission.  The ESC will present evidence
and/or make submissions at the Hearing about the investigation and any conclusions
as to whether the member has contravened the Code.  The member is entitled to
attend or be represented at the Hearing and can also present evidence and make
submissions.  Both parties can call witnesses.  Once it has heard all the evidence
and submissions, the Hearing Panel will make a determination about whether or not
it is satisfied, on the balance of probabilities, that there has been a contravention of

Page 65

34 
the Code by the member.  If the Hearing Panel decides that a member has breached
their public body’s Code, it is obliged to impose a sanction. 
Sanctions
10. The sanctions that can be imposed following a finding of a breach of the Code are as
follows:
 Censure: A censure is a formal record of the Standards Commission’s severe
and public disapproval of the member concerned.
 Suspension: This can be a full or partial suspension (for up to one year). A
full suspension means that the member is suspended from attending all
meetings of the public body.  Partial suspension means that the member is
suspended from attending some of the meetings of the public body. The
Commission can direct that any remuneration or allowance the member
receives as a result of their membership of the public body be reduced or not
paid during a period of suspension. 
 Disqualification:  Disqualification means that the member is removed from
membership of the body and disqualified (for a period not exceeding five
years), from membership of the body. Where a member is also a member of
another devolved public body (as defined in the Act), the Commission may
also remove or disqualify that person in respect of that membership. Full
details of the sanctions are set out in section 19 of the Act.
Interim Suspensions
11. Section 21 of the Act provides the Standards Commission with the power to impose
an interim suspension on a member on receipt of an interim report from the ESC
about an ongoing investigation. In making a decision about whether or not to impose
an interim suspension, a Panel comprising of three Members of the Standards
Commission will review the interim report and any representations received from the
member and will consider whether it is satisfied:
 That the further conduct of the ESC’s investigation is likely to be prejudiced
if such an action is not taken (for example if there are concerns that the
member may try to interfere with evidence or witnesses); or
 That it is otherwise in the public interest to take such a measure.  A policy
outlining how the Standards Commission makes any decision under Section
21 and the procedures it will follow in doing so, should any such a report be
received from the ESC can be found here.
12. The decision to impose an interim suspension is not, and should not be seen as, a
finding on the merits of any complaint or the validity of any allegations against a
member of a devolved public body, nor should it be viewed as a disciplinary
measure.

Page 66

35 
ANNEX B: DEFINITIONS
“Bullying” is inappropriate and unwelcome behaviour which is offensive and
intimidating, and which makes an individual or group feel undermined, humiliated or
insulted.
"Chair" includes Board Convener or any other individual discharging a similar
function to that of a Chair or Convener under alternative decision-making structures.
“Code” is the code of conduct for members of your devolved public body, which is
based on the Model Code of Conduct for members of devolved public bodies in
Scotland.
"Cohabitee" includes any person who is living with you in a relationship similar to
that of a partner, civil partner, or spouse.
“Confidential Information” includes: 
• any information passed on to the public body by a Government department
(even if it is not clearly marked as confidential) which does not allow the
disclosure of that information to the public; 
• information of which the law prohibits disclosure (under statute or by the
order of a Court); 
• any legal advice provided to the public body; or
• any other information which would reasonably be considered a breach of
confidence should it be made public.
"Election expenses" means expenses incurred, whether before, during or after
the election, on account of, or in respect of, the conduct or management of the
election.
“Employee” includes individuals employed:
• directly by the public body;
• as contractors by the public body, or
• by a contractor to work on the public body’s premises.
“Gifts” a gift can include any item or service received free of charge, or which may
be offered or promised at a discounted rate or on terms not available to the general
public. Gifts include benefits such as relief from indebtedness, loan concessions, or
provision of property, services or facilities at a cost below that generally charged to
members of the public. It can also include gifts received directly or gifts received by
any company in which the recipient holds a controlling interest in, or by a
partnership of which the recipient is a partner.
“Harassment” is any unwelcome behaviour or conduct which makes someone
feel offended, humiliated, intimidated, frightened and / or uncomfortable.
Harassment can be experienced directly or indirectly and can occur as an isolated
incident or as a course of persistent behaviour.

Page 67

OFFICIAL
“Hospitality” includes the offer or promise of food, drink, accommodation,
entertainment or the opportunity to attend any cultural or sporting event on terms
not available to the general public.
“Relevant Date”  Where a board member had an interest in shares at the date
on which the member was appointed as a member, the relevant date is – (a) that
date; and (b) the 5th April immediately following that date and in each succeeding
year, where the interest is retained on that 5th April.
“Public body” means a devolved public body listed in Schedule 3 of the Ethical
Standards in Public Life etc. (Scotland) Act 2000, as amended.
“Remuneration" includes any salary, wage, share of profits, fee, other monetary  
benefit or benefit in kind.
“Securities” a security is a certificate or other financial instrument that has
monetary value and can be traded. Securities includes equity and debt securities,
such as stocks bonds and debentures.
“Undertaking” means:
a) a body corporate or partnership; or
b) an unincorporated association carrying on a trade or business, with or
without a view to a profit.
36

Page 68

OFFICIAL
Appendix 1 – Register of Interests Form 
Received
Date Entered
Code of Conduct for Members of the
North Lanarkshire Integrated Joint Board
Register of Interests
Note:  If you have no interest in a category, please state “None”.  
The descriptions provided below are in summary form. For full details
refer to
the Code of Conduct.
Board members must register their registrable interests within
one month of becoming a board member and register any
changes to those interests within one month of those changes
having occurred.
Name:
Position on Board:
Category One: Remuneration
Remuneration from Employment
Name
(Registered name
if different) of
Employer and
Post Held 
Nature of
Business and
regularity of
remunerated
work 
Additional
Comments 
Details of
Employment held
Additional
Employment held
37

Page 69

OFFICIAL
Remuneration from Self-employment
Name of
Business
Nature of Business
and regularity of
remunerated work
Additional comments
Details of
Self-
employment
held
Additional
Self-
employment
held
Remuneration as Holder of an Office
Nature of Office
held
Organisation and any
allowances received
Additional comments
e.g. Frequency
Details of
Office Held
Additional
details of
Offices Held
Additional
details of
Offices Held
38

Page 70

OFFICIAL
Remuneration as a Director of an Undertaking
Name of
Undertaking
Nature of Business
and any allowance
received
Additional comments
Details of first
Directorship
held
Details of
second
Directorship
held
Details of third
Directorship
held
Remuneration as a Partner in a Firm
Name of
Partnership
Nature of Business
and any allowance
received
Additional comments
Details of first
Partnership
held
Details of
second
Partnership
held
Details of third
Partnership
held
39

Page 71

OFFICIAL
Remuneration from appointment or nomination by North Lanarkshire
Integration Joint Board to another body
Name of Body Nature of Business
and any allowance
received
Additional comments
Details of first
appointment
held
Details of
second
appointment
held
Details of third
appointment
held
Remuneration from a trade, profession vocation or any other work
Nature of work For whom undertaken
and Frequency
Additional comments
Details of
remuneration
from trade,
profession or
other work
Additional
instances of
remuneration
from trade,
profession or
other work
40

Page 72

OFFICIAL
Category Two:  Other Roles
This applies to any unremunerated directorships where the body in question is a
subsidiary or parent company of an undertaking in which the member holds a
remunerated directorship.
Name and
registered
number of
subsidiary,
parent or
other
organisation
Nature of
business and
relationship to
company or
other
undertaking
where
remunerated
directorship
under
Category One 
Additional
Comments 
Details of
non-
remunerated
directorship 
Additional
instances of
non-
remunerated
directorship 
41

Page 73

OFFICIAL
Category Three: Contracts
Applies to a registerable interest where the member (or a firm in which they are a
partner, or an undertaking in which they are a director or in which they have shares
of a value as described in paragraph 4.20 of the Code) have made a contract with
North Lanarkshire Integration Joint Board:
a) under which goods or services are to be provided, or works are to be
executed; and
b) which has not been fully discharged.
Description of Contract
(excluding value)
Duration of
Contract
Additional
comments
Details of
contracts
entered into
None
Additional
instances of
contracts
entered into
Additional
instances of
contracts
entered into
Category Four: Election Expenses
If a member has been elected to North Lanarkshire Integration Joint Board, then they will
register a description of, and statement of, any assistance towards election expenses
relating to election to North Lanarkshire Integration Joint Board.
Source of Assistance
towards Election
Expenses
Description of any
Allowance received
Additional
comments
Details of
election
expenses
Additional
instances of
election
expenses
42

Page 74

OFFICIAL
Category Five: Houses, Land and Buildings
Requirement to declare land/housing ownership or any other right or interest in
houses which may be significant to, or of relevance to, or bear upon, the work of
North Lanarkshire Integration Joint Board
Description
of interest
Description of
approximate location
Additional comments
Details of interests
in houses, land
and buildings
Additional
instances of
interests in
houses, land and
buildings
Additional
instances of
interests in
houses, land and
buildings
Category Six:  Shares and Securities
A description of the shares is required if (a) a member owns or has an interest in more
than 1% of the issued share capital of the company or other body; or (b) where, at the
relevant date, the market value of any shares and securities (in any one specific company
or body) that they own or have an interest in is greater than
£25,000.
Description of
undertaking
Description of nature of
holding (value need not
be disclosed)
Additional
comments
Details of interests
in shares and
securities which
may be significant
to, or relevant to,
or bear upon the
work of the IJB
43

Page 75

OFFICIAL
Additional
instances of
interests in shares
and securities
which may be
significant to, or
relevant to, or bear
upon the work of
the IJB
Additional
instances of
interests in shares
and securities
which may be
significant to, or
relevant to, or bear
upon the work of
the IJB
Category Seven:  Gifts and Hospitality
Members should understand the requirements of paragraphs 3.12 to 3.20 regarding
gifts and hospitality. As members will not accept any gifts or hospitality, other than
under the limited circumstances allowed, they understand there is no longer the need
to register any.
Date Description of Gift Received from
44

Page 76

OFFICIAL
Category Eight: Non-Financial Interests
Members may also have other interests and they understand it is equally important
that relevant interests such as membership or holding office in other public bodies,
companies, clubs, societies and organisations such as trades unions and voluntary
organisations, are registered and described. In this context, they understand non-
financial interests are those which members of the public with knowledge of the
relevant facts might reasonably think could influence their actions, speeches, votes
or decision-making in North Lanarkshire Integration Joint Board (this includes its
Committees and memberships of other organisations to which they have been
appointed or nominated by North Lanarkshire Integration Joint Board).
Description of interest Additional comments
Details of non-
financial interests
which may be
significant to, or
relevant to, or bear
upon the work of
the IJB
Additional
instances of non-
financial interests
which may be
significant to, or
relevant to, or bear
upon the work of
the IJB
Additional
instances of non-
financial interests
which may be
significant to, or
relevant to, or bear
upon the work of
the IJB
45

Page 77

OFFICIAL
Category Nine: Close Family
Members
Members will register the interests of any close family member who has
transactions with North Lanarkshire Integration Joint Board or is likely
to have transactions or do business with it.
Relationship Nature of
transaction
Additional
comments
Details of
interest
Additional
instances of
interest
Additional
instances of
interest
Date of Preparation:
Number of
Continuation
Sheets:
Signed:
46

Page 78

Version 
Control 
Date  Summary of Changes  
1  20/03/2023 
North Lanarkshire 
Integration Joint Board 
DIRECTIONS POLICY 
Appendix 4
47

Page 79

Contents 
1. Purpose and Scope .......................................................................................................................... 1
2. Policy Aims ...................................................................................................................................... 1
3. Legislative/Policy Framework ......................................................................................................... 1
4. Definition and Purpose of Directions .............................................................................................. 2
5. Policy Implementation .................................................................................................................... 2
6. Monitoring and Review ................................................................................................................... 3
Appendix 1: Directions Procedure .......................................................................................................... 4 
Appendix 2 :Process for Issuing Directions ............................................................................................. 5 
48

Page 80

1. Purpose and Scope
This policy sets out the process for formulating, approving, issuing and reviewing directions from 
North Lanarkshire Integration Joint to NHS Lanarkshire and North Lanarkshire Council.  
This policy has been developed in line with the Public Bodies (Joint Working) (Scotland) Act 2014 
and Scottish Governments Statutory Guidance on Directions from Integration Authorities to 
Health Boards and Local Authorities. 
The Public Bodies (Joint Working) (Scotland) Act 2014 places a duty on Integration Authorities 
(IJBs) to develop a strategic commissioning plan, for integrated functions and budgets under 
their control. 
An Integration Authority requires a mechanism to action their strategic commissioning plan, this 
mechanism takes the form of binding directions from the Integration Authority to one or both of 
NHS Lanarkshire and North Lanarkshire Council. Directions are also the means by which a record 
is maintained of which body decided what and with what advice, which body is responsible for 
what, ad which body should be audited for what, whether in financial or decision making terms. 
In January 2020, the Scottish Government issued Statutory Guidance on Directions from 
Integration Authorities to Health Boards and Local Authorities. 
The North Lanarkshire Joint Board must issue a direction in respect of every function that has 
been delegated to it by NHS Lanarkshire and North Lanarkshire Council which must provide 
relevant budget information. 
Directions are the means by which the IJB informs the Health Board and the Local Authority 
what is to be delivered using the integrated budget and for the IJB to improve the quality and 
sustainability of care, as outlined in its strategic commissioning plan. Directions are also the legal 
basis on which the Health Board and Local Authority deliver services that are under the control 
of the IJB. 
2. Policy Aims
This policy seeks to enhance governance, transparency and accountability between the IJB, NHS 
Lanarkshire and North Lanarkshire Council by clarifying responsibilities.  
This policy has been developed to ensure compliance with the Scottish Governments Directions 
from Integration Authorities to health boards and local authorities: statutory guidance.  
3. Legislative/Policy Framework
The Public Bodies (Joint Working) (Scotland) Act 2014 states that an Integration Joint Board must 
give a direction to constituent authority to carry out each function delegated to Integration 
Authority.  
Revised statutory guidance on directions was issued by Scottish Government in January 2020. 
This statutory guidance has informed the development of this policy, to ensure that the IJB can 
meet the key requirement of the guidance to improve governance, transparency and 
accountability between all partner organisations.  
49

Page 81

4. Definition and Purpose of Directions
It is essential that directions are understood to be the end point of a process of decision making 
by the IJB. Directions should not contain surprising or completely unknown information about 
service change or redesign and should follow a period of wider engagement on the function(s) 
that are the subject of the direction. This should normally be part of the service planning and 
design phase of strategic commissioning.  
Directions are legally binding, which is why they come at the end point of a process of planning 
and decision making. The delivery partners are required to comply with all directions received 
from the IJB, and the law is clear that they may not amend, ignore, appeal or veto any direction. 
Neither NHS Lanarkshire nor North Lanarkshire Council may use resources allocated via the 
Integration Joint Board in pursuit of a direction for any other purpose than that intended.  
The content of Directions should be sufficiently detailed to ensure the intention of the IJB is 
adequately captured. Directions should include information on the required delivery of the 
function and the financial resources that are available for carrying out the function. Directions 
may specify what the Health Board, Local Authority or both are to do in relation to carrying out a 
particular function. Lack of detail in a direction may cause difficulties in performance monitoring 
and hamper the effective delivery of the function.  
To assist with monitoring and reviewing directions issued, the IJB may seek information from 
either the Health Board or Local Authority or both about the delivery 5 of a function that is the 
subject of a direction, including when issues are identified in implementation and delivery of a 
direction.  
Specific directions can be given to NHS Lanarkshire, North Lanarkshire Council, or both (Health 
and Social Care Partnership (H&SCP)) depending on the services to be provided. However, 
directions should not be issued unnecessarily and should be proportionate.  
A direction will remain in place until it is revoked, varied or superseded by a later direction in 
respect of the same function.  
In summary, the purpose of directions is to set a clear framework for the operational delivery of 
the functions that have been delegated to the IJB. All directions must be in writing. Functions 
may be described in terms of delivery of services, achievement of outcomes and/or the priorities 
set out in the strategic commissioning plan. 
5. Policy Implementation
This Policy has been developed in line with the Public Bodies (Joint Working) (Scotland) Act 
2014, Scottish Governments Statutory Guidance on Directions from Integration Authorities to 
Health Boards and Local Authorities as published in January 2020.  
This Policy defines what a direction is and is underpinned by the Directions Procedure (Appendix 
1) which supports the development of new and revised directions.
 
Directions are informed by a number of factors, including but not limited to: 
 Content of the IJB Strategic Commissioning Plan
 Specific service redesign or transformation programmes
50

Page 82

 Financial changes or developments
 A change in local circumstances
 A fundamental change to practice or operations.
6. Monitoring and Review
 
Directions: 
The IJB has agreed that Directions will be monitored on a quarterly basis via the IJB Committee 
structure. This will ensure that the relevant Committee will assume responsibility for 
maintaining an overview of progress with the implementation of directions, via detailed reports, 
and escalating any issues to the IJB.  
A full set of directions, will be presented to the IJB at the start of the financial year following 
confirmation of budget setting arrangements, however, other directions will be brought 
forward throughout the year to reflect strategic developments and service transformation.  
Policy:  
This policy will be reviewed every two years by the IJB, or earlier if Scottish Government release 
further guidance. 
51

Page 83

Appendix 1: Directions Procedure 
This procedure sets out the process for formulating, approving, issuing and reviewing directions 
for the North Lanarkshire Integration Joint Board to NHS Lanarkshire, North Lanarkshire Council 
or both constituent authorities. A process map is attached at Appendix 2 of this document.  
1. Directions
Directions are the mechanism by which the IJB delivers its Strategic Commissioning Plan.  
When a Direction is presented to the IJB, the report author must ensure that the content of the 
Direction include details of the function to which it is the subject of, budget information which 
has been delegated to deliver it, the impact on workforce, any legal or risk implications, impact 
on IJB outcomes, priorities or policy, details of consultation and an Equalities Impact 
Assessment if required.  
The final page of the report template (attached at Appendix 3) provides a standard format for 
outlining the requirements for each direction to be issued; all sections of this must be 
completed.  
Following approval at the IJB a Direction will then be issued on behalf of the Chief Officer to the 
Chief Executive of NHS Lanarkshire, the Chief Executive of North Lanarkshire Council, or both. 
This will take the form of a letter together with the IJB report, including Direction template. 
 
Directions will be copied to the Chair and Vice Chair of the NHS Board and the Leader and 
Deputy Leader of the Local Authority. 
 
Directions should be issued within 7 days of IJB approval where possible. 
 
The details of each Direction issued by the IJB are entered into the IJB Register of Directions. 
 
An update on Directions will be provided quarterly to the IJB. A Direction will remain in place 
until it is varied, revoked or superseded by a later direction in respect of the same functions.  
2. Implementation and Monitoring of Directions
 
NHS Lanarkshire and North Lanarkshire Council are responsible for complying with and 
implementing all directions issued by the IJB. As the issuing of directions is a legally binding 
process any issues with this should be brought to the attention of the Chief Officer.  
An annual report on all current Directions will be presented to the IJB. 
52

Page 84

Appendix 2: Process for Issuing Directions  
If any of the following cicrumstances are detailed within the report being submitted to the IJB, then a direction should be issued as per process detailed 
below..  
o Specific service redesign or transformation
o Financial changes or developments
o Strategic Commissioning Plan
o Changes in local circumstances
o Fundamental changes to practice or operations
When issuing a direction consideration must be given to:  
 Scope and scale of function
 Finance involved
 Scale and nature of change
 Timescale for delivery
 Those impacted by the change
‐ Patients
‐ Service users
Paper presented to 
IJB/IJB PFA  for 
discussion 
IJB agree the 
directions required 
based on paper 
Directions issued to 
relevant partner(s) to 
carry out the functions 
relating to the 
directions 
Assurance provded via 
the IJB on the delivery 
of the function to 
which the Direction 
related to on a quartly 
basis
53

Page 85

‐ Carers 
‐ Local communities 
‐ Staff 
‐ Others 
54

Page 86

Appendix 3 ‐Direction from North Lanarkshire Integration Joint Board 
(IJB)  
1  Reference Number   This will be provided by IJB Administration 
Support Team 
2  Report Title   Title of Report 
3  Date direction issued by IJB  Date of IJB meeting that direction was issued 
4  Date from which direction 
takes effect 
Date of when the direction should begin to be 
implemented or date direction issued by IJB 
5  Direction to:  This can be either: 
‐ NHS Lanarkshire 
‐ North Lanarkshire Council 
‐ H&SCP  
6  Does this direction supersede, 
revise or revoke a previous 
direction – if yes, include 
reference number(s) 
This can be provided by IJB Administration 
Support Team 
7  Functions covered by direction  List all the functions to which the direction 
related e.g. Occupational Therapy, Mental 
Health.  
8  Full text of direction  Detail what the authorities are being asked to 
carry out.  
9  Budget allocated by Integration 
Joint Board to carry out 
direction 
Detail if any funding has been allocated by IJB to 
carry out direction.  
10  Performance Management / 
Governance arrangements  
Directions will be reported to the relevant IJB 
committee quarterly and an annual report of all 
current directions presented to IJB.  
Detail if any other groups etc will be involved in 
the performance management of the direction 
e.g. Core/ SLT.  
55

Page 87

11  Date direction will be reviewed   Date at which the next review of the direction is 
due (e.g. at next IJB meeting). 
56

Page 88

NORTH LANARKSHIRE IJB RISK REGISTER 
OVERVIEW 
[Document subtitle] 
Anderson, Stacey 
[Email address] 
Abstract 
[Draw your reader in with an engaging abstract. It is typically a short summary of the document. 
When you’re ready to add your content, just click here and start typing.] 
Appendix 5
57

Page 89

North Lanarkshire IJB Risks – Dashboard 
Executive Summary 
 Following an agreement of the IJB Risk Strategy at the IJB held on xxxxxx, a full review of the IJB risk register was undertaken
 Any emerging or new risks are discussed at the IJB PFA and presented for information at IJB
 All risks on the IJB Risk Register are consistently reported to relevant assurance committees to provide oversight and assurance
Highest Scoring Risks 
IJB  Risk   Score   Trend  
NL Council   Risk   Score   Trend  
Risk movement since last report 
No Change  Risk Level  
Increase 
Risk Level 
Decrease 
New Risks  Closed Risks   Risks with 
Action 
Updates  
Risk Registers  Number of 
Risks  
IJB 
NL Council  
NHS 
Lanarkshire 
58

Page 90

NHS Lanarkshire   Risk Score   Trend 
 
59

Page 91

Details of IJB Risk Movement/ Update of Actions   
Risk (Reference 
and Title) 
Date Risk 
Added to 
Register  
Current Score  Trend  Target 
Score  
Commentary  SMART Actions 
for the risk  
60

Page 92

61
REPORT
Item No: 
SUBJECT:
TO:
Lead
Officer for
Report:
Author(s) of
Report
DATE: 16 February 2023
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
For approval ☐ For endorsement ☐ To note ☐
2. ROUTE TO THE BOARD
This paper has been:
Prepared By: ☐ Reviewed By: ☐ Endorsed By: ☐
Appendix 6

Page 93

62
3. RECOMMENDATIONS
4. VARIATIONS TO DIRECTIONS?
5. BACKGROUND/SUMMARY OF KEY ISSUES
6. CONCLUSIONS
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☐
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☐
Health and Social Care Services contribute to reducing health inequalities  ☐
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☐
Yes  ☐ No ☐ N/A ☐

Page 94

63
7.2 ASSOCIATED MEASURE(S)
7.3 FINANCIAL
This paper has been reviewed by Finance:
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Choose an item.
7.5  ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken.
Objectives  Further Details
☐ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
☐ Provide stakeholders with information on
how to get involved
☐ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☐ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
☐ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
Yes  ☐ No ☐ N/A ☐

Page 95

64
☐ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff
☐ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
EQIA added to website: 
8. BACKGROUND PAPERS
9. APPENDICES
Please include a glossary of terms if not already included. 
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Yes  ☐ No ☐ N/A ☐
Yes /
Date
added
☐ No ☐ N/A ☐
Members seeking further information about any aspect of this report, please contact
the following;

Page 96

65
Direction from North Lanarkshire Integration Joint Board (IJB)
1 Reference Number
2 Report Title
3 Date direction issued by IJB
4 Date from which direction
takes effect
5 Direction to:
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s)
7 Functions covered by
direction
8 Full text of direction
9 Budget allocated by
Integration Joint Board to
carry out direction
10 Performance Management /
Governance arrangements
11 Date direction will be
reviewed

Page 97

66
REPORT
Item No: 
SUBJECT: This will match the name on the agenda.   Please do not use ALL
CAPITAL LETTERS when typing this.
TO: This will be the name of the committee either –Integration Joint
Board or Integration Joint Board Performance, Finance & Audit.
Lead
Officer for
Report:
This should include full name and job title and should be completed
before being submitted to IJB administration support. 
Author(s) of
Report 
This should include full name and job title of any report contributors
and should be completed before being submitted to IJB
administration support. 
DATE: 16 February 2023 Show the actual date of the meeting
being presented at; to do this select the correct date from drop down
box. Please do not enter date when the report is written.
1. PURPOSE OF REPORT
Identify by using the correct check box is report is for approval, endorsement or
noting. Please make at least one selection in this section.
This paper is coming to the IJB for:
For Approval: ☐ For Endorsement: ☐ To Note: ☐
2. ROUTE TO THE BOARD
Where possible outline who has prepared the report, who has reviewed report prior
to submission and who has endorsed the report (such as another group).
This paper has been:
Prepared By: ☐ Reviewed By: ☐ Endorsed By: ☐
Appendix 7

Page 98

67
3. RECOMMENDATIONS
Recommendations must be written in line with the following example: It is
recommended that the IJB/IJB PFA Committee: 
(1)
(2)
(3) etc.
Each individual recommendation should have a separate number and each
recommendation should ask something of the audience, e.g. approve, consider,
endorse, acknowledge, recognise, review, etc.
Use of the word Note in recommendations should be avoided, alternative words
could be consider, endorse, acknowledge, recognise, review, etc.
It should be noted that many committees are required to receive reports for
information in line with the terms of reference for that committee or because there is
a statutory requirement to do so. If this is the case, please state this in the
recommendations, e.g. consider abc in line with xyz.
Recommendations listed in this section should be articulated in the body of the
report (i.e. the rationale for any recommendation should be set out clearly in the
body of the report), similarly any recommendation narrated in the body of the report
should be listed in the recommendations section.
A recommendation for a report to be remitted to another Committee / Sub-
Committee should only be included if that Committee / Sub-Committee requires to
take a decision - remits for Noting are discouraged.
Please don’t forget to number the recommendations using a simple 1, 2, 3, 4,
etc format (not roman numerals or using a b, c, d).

Page 99

68
4. VARIATIONS TO DIRECTIONS?
Directions are the means by which the IJB tells the Health Board and the
Council what is to be delivered using the integrated budget. 
A direction must be given in respect of every function that has been
delegated to the IJB. Directions are a legal mechanism, the use
of directions is not optional for IJBs, Health Boards or Local Authorities, it
is obligatory.
This section outlines if the report requires a direction to be issued to the Local
Authority, the Health Board, to both, or that no direction is required
Detail if Health Board, Local Authority or Both.         
5. BACKGROUND/SUMMARY OF KEY ISSUES
The Background should set the context for your report and contain information that
covers, for example, what has led to the purpose of the report (e.g. legislative or
transformational change), summarising relevant information previously reported and
previous decisions approved. It should provide sufficient information so that the
reader understands the context within which the report is being presented.
The body of the report should be as succinct as possible and the text should flow
logically. It should inform readers of the work carried out to date and explain future
work plans. Generally, it should provide new information that requires further
consideration and/or approval.
Long sentences or paragraphs of text should be avoided; short sentences and short
paragraphs are much easier to read.
Please don’t forget to check the paragraph numbering runs in sequence, the
text is formatted correctly, and the paragraph numbering is formatted and
indented correctly.
Headers are Arial, font size 12, bold with single line spacing.
Body of the report is Arial, font size 12 with single line spacing.
Yes ☐ No ☐ N/A ☐

Page 100

69
6. CONCLUSIONS
This section should draw the committee’s attention back to the key reasons and
arguments in favour of the recommendations made within the report. 
Conclusions can also inspire fresh concepts to address a problem highlighted within
the report or presenting fresh perspectives on a subject.
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Please check the relevant boxes from the 9 national outcomes.
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☐
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☐
Health and Social Care Services contribute to reducing health inequalities  ☐
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☐
7.2 ASSOCIATED MEASURE(S)
This should refer to other associated work/governance arrangements in place.
7.3 FINANCIAL
Where there is a financial impact highlighted within your report, please summarise
this impact.
In doing so please ensure that all financial impacts have been discussed and agreed
with Finance.
Where there is a financial impact that requires to be discussed and agreed with
Finance, please ensure you have ticked the box to confirm that this has been done.

Page 101

70
This paper has been reviewed by Finance:
Yes   No  N/A
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
State details of which Risk Register the topic is listed on (if any), the current risk level
and the risk owner. Where appropriate outline any mitigations in place.
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Choose an item.
7.5  ENGAGEMENT & PARTICIPATION
State how engagement and participation links to this piece of work, providing further
details where appropriate on what engagement and participation was undertaken. 
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details on the engagement and participation that was
undertaken.
Objectives  Further details 
☐ Involve stakeholders in the development
work aimed at achieving the national 
outcomes
☐ Provide stakeholders with information on
how to get involved
☐ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☐ Measure how well we involve community
stakeholders in the planning, design 
and delivery of our services 
☐ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery
☐ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings
☐ Develop participation guidelines to ensure
a common understanding and set of

Page 102

71
expectations for both stakeholders and
partnership staff
☐ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
As per Equality Act 2010, please ensure that the policy, project or scheme does not
unlawfully discriminate against any protected characteristics. EQIAs should be
carried out: when developing new or reviewing current policies, strategies, services
and functions. Please see Equality Impact Assessment Guidance and Forms
(available on first port) for further guidance. . 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes  No  N/A
EQIA added to website: 
Yes  No  N/A
8. BACKGROUND PAPERS
Outline any other relevant papers or websites.
9. APPENDICES
Please include a glossary of terms if not already included. 
If the report has one or more Appendices, please use this section to list the
Appendices (examples below). These can be files attached to the report or
hyperlinks to external sources, e.g. a website.

Page 103

72
For example:
- Appendix 1 - name of document attached to report
- Appendix 2 - title on web page and url hyperlink for an item on the council’s
website or to an external webpage. Please ensure any url links will work for all
audiences.
Please do not embed Excel / Word / PowerPoint / PDF files into your report -
they are not always able to be retrieved by the reader when turned into a pdf;
so do not always enable the reader to review the complete information.
Any information from embedded files must be extracted and added as an
appendix.
Please do not insert any other text under the name and title of the signatory for
the report.
.
CHIEF ACCOUNTABLE OFFICER (or Depute)  
For governance purposes the accountable officer should be a chief officer (Heads of
Service are classed as chief officers).
This should be an electronic signature and not typed.
Note: All reports must have a signature.
Members seeking further information about any aspect of this report, please contact
the following;
It is useful to provide the details of the contact person (name, e-mail address, and
telephone) who can respond to enquiries on the subject matter of the report, so the
E-mail address can show either show the Chief Officer or the author of the repor

Page 104

1 
REPORT 
Item No: 7 
SUBJECT: Resilience Response
TO: Integration Joint Board
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Author(s)
of Report
Ross McGuffie ,Chief Officer North HSCP
DATE: 17 May 2023 
1. PURPOSE OF REPORT 
1.1 This paper is coming to the Integration Joint Board:   
For approval  For endorsement  To note 
1.2 This paper sets out the actions being taken in response to current whole system
service pressures. 
2. ROUTE TO THE INTEGRATION JOINT BOARD 
2.1 This paper has been: 
Prepared  Reviewed  Endorsed 
By the command structure in the Health and Social Care Partnership.   
3.          RECOMMENDATIONS 
3.1  The PFA is asked to:
(1) Note that NHS Lanarkshire stood down its Covid Live Incident down in
January 2023, though command structures have been adapted to continue to
focus on ongoing wider resilience challenges, specifically around service
pressures
(2) Note that NHS Lanarkshire was able to move from black to red status on 6th
March 2023, following a successful ‘firebreak’ as part of Operation Flow 
4.  VARIATIONS TO DIRECTIONS 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Background
5.1.1  NHS Lanarkshire stood down its Live Covid Incident in January 2023, however,
the operational pressures emanating from the pandemic recovery have been
pronounced, with NHS Lanarkshire in Black status since 27th July 2022. 
Yes  No  N/A

Page 105

2 
5.1.2 Operation Flow was developed to create a ‘firebreak’ to rapidly reduce hospital
inpatient capacity, then creating the staff capacity to work on service redesign to
bring the system as a whole back into equilibrium. 
5.1.3 Following the 9-day firebreak, hospital inpatient capacity reduced by around 15%
across Lanarkshire, supporting the system to move from black to red status on 6th
March 2023. 
5.2 Operation Flow
5.2.1 The IJB received an update on Operation Flow at its meeting on 22nd March 2023
and again at the PFA meeting on 19th April 2023. Operation Flow is the whole
system strategic planning approach in Lanarkshire aimed at supporting a sustained
recovery of the entire health and social care system. 
5.2.2 Following two further face to face planning sessions that brought together leaders
from across the whole system, a Task and Finish structure has now been developed
to take forward the key actions agreed for Operation Flow 2 (see appendix 1). 
5.2.3 Five Task and Finish groups commenced on week beginning 24th April, with the aim
to have the second stage of Operation Flow fully implemented by September 2023.   
5.3 Delayed Discharge
5.3.1 One of the key aims of the Firebreak was to utilise multi-agency teams to review
all inpatients on a daily basis, with the aim of improving the flow of the 95% of
patients who don’t need supported discharge, but also supporting earlier
identification of the 5% who will require support. 
5.3.2 Performance in North Lanarkshire has been on an improving trajectory since
February, though the Easter fortnight did present some challenges as
demonstrated in figure 1, though performance has returned back to the mid-70s by
the end of April. 
Figure 1 North Lanarkshire Delayed Discharges
5.3.3 Figure 2 shows that bed days were out with routine variation in January but have
returned within the control limits in February. This contrasts with the Scotland
position where delayed discharge bed days for standard delays are at pre Covid

Page 106

3 
levels with special cause variation September – February 2023 (fig. 3). Since the
operation flow ‘firebreak’ in late February/early March, delayed discharge
performance has been on a positive trajectory. 
Figure 2 HSCP NL SPC Standard Bed Days  
Figure 3 NHS Scotland Standard Delays bed days 
5.3.4 Performance at the 10th April 2023 Public Health Scotland data release (figure 4)
showed North Lanarkshire continued below the Scottish average in terms of rates
of delay for the overall adult population and in a similar position for 75+ delays.

Page 107

4 
Figure 4 Patients in standard delay, rate per 100,000 for all HSCPs 
5.3.5 The number of patients discharged with no delay dropped from 96% to 95% (target
98%) over the Easter fortnight (figure 5). 
Figure 5 All inpatient discharges 
5.3.6 Whole system work continues on the Discharge Without Delay process, current
performance (figure 6) shows the overall increase in patients aged 65+ who have a
PDD set and remains consistently around 60% though this has dipped moving into
April. Figure 7 shows a decrease in unplanned referrals to their lowest point in six
months in the middle of March but these have increased again in recent weeks. 
Figure 6 Current Inpatients (at time of census) with a Planned Date of Discharge

Page 108

5 
Figure 7 Current Inpatients (at time of census) with a SW referral that is unplanned 
5.3.6 Factors affecting performance over Easter:
 Higher annual leave across the whole system
 Increase in sickness absence, including Covid
 Significant pressures on acute sites, with added complication of a peak of Covid
inpatients hitting highest number in a significant number of months of over 130
 Due to site pressures, referrals for supported discharge on the date of clinical
readiness increased and planned dates of discharge dipped. It is important to note,
however, that both Lanarkshire partnerships have not seen the deterioration in
performance around Delayed Discharge as seen elsewhere in Scotland since the
pandemic due to the significant improvements in use of planned dates of discharge
and reducing numbers of unplanned referrals (though admittedly starting from a
poor baseline)
 Demand for supported discharge remains very high, with over 130 referrals per
week being received in recent weeks. To put this into context, during the peak winter
pressures of 2019/20, North Lanarkshire had the highest rate of referrals for
supported discharge in Scotland, averaging 77 referrals per week. 
5.3.7 Current developments:
 New Home Assessment Teams are now live in 2 Localities and rolling out across
the remaining 4. These teams provide wrap around care and assessment for 2wks
in people’s own homes. This allows us to provide early supported discharge and
assessments in the patient’s own home, rather than in an acute environment. To
date, we have received 608 referrals from hospital, with 62% requiring no ongoing
Home Support after the 2wks of support. The aim is to provide this service from
community as well in future to prevent unnecessary admissions
 Additional Clinical Support Worker posts have been created in the District Nursing
Teams to focus on those identified for Care Management (highest risk of admission)
to support more proactive support of high risk patients in the community
 New choice protocol developed to more proactively manage Care Home related
delays
 Lanarkshire is a demonstrator site for Discharge Without Delay. The graphs above
highlight the improved understanding of our system and whole-system focus on
improvement

Page 109

6 
 Home Support programme board in place to review the current service model and
implement new ways of working 
5.3.8 With a number of upcoming long weekends in May, the partnership will have a full
presence on the acute sites over the long weekends, including our Home
Assessment Teams, while Planned Dates of Discharge will continue to be set for
over the long weekends with the aim of ensuring flow is maintained. 
6. CONCLUSIONS
6.1 There has been a tremendous whole system effort to plan Operation Flow and to
enact the firebreak at scale and pace. 
6.2 The reduction in occupancy levels across all three sites has allowed NHS
Lanarkshire to move from black to red status on 6th March 2022, following over 6
months in black status. 
6.3 Attention has now moved to make the most of the system decompression to move
forwards with the ambitious change programme identified to ensure the positive
performance improvements can be sustained and indeed further improved over
time. 
7. IMPLICATIONS 
7.1  NATIONAL OUTCOMES 
This relates to all nine national outcomes. 
7.2 ASSOCIATED MEASURE(S) 
A weekly performance framework has been developed to track progress. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT
Risk IJB 17/22 sets out the unscheduled care challenges currently being faced in
the Lanarkshire system. 
7.5 PEOPLE 
The Strategic Planning Group has increased in frequency to quarterly throughout
the pandemic to support engagement with staff, service users and carers and staff
roadshows have also recommenced on a quarterly basis. 
7.6  INEQUALITY & FAIRER SCOTLAND DUTY 
Yes  No  N/A 
8. BACKGROUND PAPERS 
None.

Page 110

7 
9. APPENDICES 
Appendix 1: Operation Flow 2 structure   
.............................................................................
CHIEF OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact
Ross McGuffie on telephone number 01698 752 591.

Page 111

8 
Appendix 1: Operation Flow 2 structure

Page 112

1 
REPORT 
Item No: 8 
SUBJECT: Health and Social Care Delayed Discharge and Hospital Occupancy Action
Plan
TO: Integration Joint Board
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Author(s)
of Report
Morag Dendy, Head of Planning, Performance and Quality Assurance
DATE: 17th May 2023 
1. PURPOSE OF REPORT 
1.1 This paper is coming to the Integration Joint Board:   
For approval  For endorsement  To note 
1.2 This paper sets out Scottish Government’s action plan to improve delayed discharge and
hospital occupancy. 
2. ROUTE TO THE INTEGRATION JOINT BOARD 
2.1 This paper has been: 
Prepared  Reviewed  Endorsed 
By the command structure in the Health and Social Care Partnership.   
3.          RECOMMENDATIONS 
3.1  The IJB is asked to:
(1) Note the Scottish Government action plan on delayed discharge and hospital
occupancy;
(2) Note that the actions contained within are being built into the phase 1 action plan
for Operation Flow, to ensure a whole system approach is fully embedded in
Lanarkshire;
(3) Request sight of the Operation Flow phase 1 action plan and associated task and
finish groups once finalised. 
4.  VARIATIONS TO DIRECTIONS 
Yes  No  N/A

Page 113

2 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Background
5.1.1  Winter 2022/23 was an incredibly challenging period for health and social care systems
across Scotland, managing a number of complex factors including increased seasonal
demand for unscheduled care and critical care due to the combined incidence of flu,
Covid-19 and other respiratory infections.   
5.1.2 Throughout this period, local systems have tried to manage through these competing
demands with whole system actions such as Discharge Events and substantial
developments such as Operation Flow within Lanarkshire. 
5.1.3 This has led to a greater understanding of the issues being faced and what works, with
the greatest challenge facing all systems being how to turn this into plans that can create
a sustainable difference. 
5.1.4 The action plan brings together 12 whole system actions across the areas of Good
Practice, Data Management and Workforce, that are essential in reducing pressure on
staff and the system and in ensuring people receive the right care in the right place at the
right time. The Action Plan is attached in appendix 1. 
5.2 Delayed Discharge and Hospital Occupancy Action Plan
5.2.1 The Action Plan places significant emphasis on ‘getting the basics right’ through
consistent implementation of models such as the Discharge Without Delay programme, of
which NHS Lanarkshire is a demonstrator site. This includes: 
 Use of admission avoidance approaches such as Hospital at Home, multi-agency input at
the front door, Locality rapid wrap-around models and early whole-system input within
the first 48hrs of admission for those who do require acute care. 
 The social care needs of patients are considered in every ward with social work input to
wards with high frailty, providing expert advice and input to discharge planning
 Discharge Without Delay principles should be utilised to set jointly agreed Planned Dates
of Discharge, reviewed daily and used to plan and prepare discharges
 Use of multi-agency teams to support senior decision making, with whole system visibility
of plans and senior oversight and escalation to resolve any delay-causing issues
 Structured ward rounds or white board reviews 7 days per week to ensure there are
priorities, plans and tasks set for the day and the parameters for criteria led discharge
agreed to support early discharge
 Utilise Planned Dates of Discharge to commission/organise care
 Identify complex discharges early in their inpatient journey, including those with high
frailty scores, to allow coordinated multi-agency management
 Ensure early engagement with families and carers to manage expectations 
 Implement discharge to assess and intermediate care models to support discharge home
and allow assessments for ongoing care to be undertaken in people’s own homes. Utilise
community rehabilitation as the preferred place of recovery and intermediate care. 
5.2.2 These ‘getting the basics right’ actions are included in NHS Lanarkshire’s Flow Foundation 
Bundle developed through Operation Flow.

Page 114

3 
5.2.3 The twelve actions identified within the plan are noted below: 
1 All systems to review and implement learning from their
discharge event to embed improvements in an ongoing,
‘business as usual’ way
Boards and IJBs to confirm
this has  been actioned by
end March 2023
2 Put systems in place to provide the assurance necessary to
confirm the measures set out in ‘Getting the Basics Right’
are consistently being applied
Boards and IJBs  to
confirm this has been
actioned by end April
2023
3 SG will continue work with NES to develop a toolkit of
support and training materials to support discharge
Toolkit and materials to
be available by end April
2023
4 Boards and IJBs  to assess their systems and processes in
terms of acute discharge planning and apply the DwD
toolkit in every inpatient area, community hospitals and
other off-site beds
Boards and IJBs to confirm
this has been actioned by
end April 2023
5 SG to provide a tactical social care dashboarding solution to
support HSCPs and HBs to have access to a core set of
indicators, predicated on existing and robust management
information to enable consistent and comparable data to
be available at different levels of geography
Dashboard to be available
by end April 2023
6 SG to provide modelling of potential future demand to
support more effective local planning
Modelling to be available
by end April 2023
7 SG to support partners to develop forum to drive work
towards more consistent and comprehensive data
Forum to be established
by end March 2023
8 SG/PHS/NSS to provide a strategic solution for the delivery
of MI data for insights across health and social care using
NSS’s Seer2 platform
Solution to be agreed by
end May 2023
9 SG to support local partners through NES to utilise
international recruitment
Ongoing
10 Continue to pursue national recruitment campaign Ongoing
11 Continue to pursue recruitment activity with DWP for
Ukrainian displaced people and UK residents that are
economically inactive
Ongoing
12 Increase in pay to £10.90 per hour in 23/24 for adult social
care sector in commissioned services. Looking at
improvements to terms and conditions for adult social care
in 2023/24
April 2023 and ongoing 
5.2.4 A number of face to face whole-system development sessions have been held to support
learning from the Operation Flow firebreak, with a weekly whole-system Operation Flow
Programme in Board to develop the next stages of the local action plan. 
5.2.5 Five task and finish groups have been developed to implement the local action plan,
which picks up actions 1, 2 and 4 in the table above. This will conclude the first phase of
Operation Flow, with the aim of having sustainable implementation of these initial actions
by summer. Phase two will then commence with a view to preparing for winter, with the
third phase then being the wider transformation of services in the longer-term. 
5.2.6 The North Lanarkshire HSCP has been involved in the previous exercises to build a social
care dashboard outlined in action 5, with work ongoing to develop this through the new

Page 115

4 
national Whole System Oversight and Planning Group, of which the North Lanarkshire
Chief Officer is a member. 
5.2.7 The Lanarkshire system continues to engage with the Scottish Government and NES
around international recruitment, with some recent success through this approach.   
6. CONCLUSIONS
6.1 Through Operation Flow, the Lanarkshire system has undertaken a large-scale
programme of change, which has picked up the vast majority of the actions outlined
within the new national action plan. 
6.2 The Operation Flow phase 1 action plan and associated task and finish groups is currently
being finalised and will be shared with the NHS Board and IJBs in due course, for full
implementation over the coming 3-4 months. 
7. IMPLICATIONS 
7.1  NATIONAL OUTCOMES 
This relates to all nine national outcomes. 
7.2 ASSOCIATED MEASURE(S) 
A weekly performance framework has been developed to track progress. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  No  N/A 
7.4 RISK ASSESSMENT/RISK MANAGEMENT
Risk IJB 17/22 sets out the impact of unscheduled care challenges in the Lanarkshire
system. 
7.5 PEOPLE 
The Strategic Planning Group has increased in frequency to quarterly throughout the
pandemic to support engagement with staff, service users and carers and staff roadshows
have also recommenced on a quarterly basis. 
7.6  INEQUALITY & FAIRER SCOTLAND DUTY 
Yes  No  N/A 
8. BACKGROUND PAPERS 
None. 
9. APPENDICES 
Appendix 1 Health and Social Care Delayed Discharge and Hospital Occupancy Action Plan

Page 116

5 
.............................................................................
CHIEF OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact Ross
McGuffie on telephone number 01698 752 591.

Page 117

6 
Appendix 1 
Health and Social Care 
Delayed Discharge and
Hospital Occupancy
Action Plan 
March 2023

Page 118

7 
Contents
Foreword
1. Context ............................................................................................................. 10
2. Delayed Discharge .......................................................................................... 11
2.1 Defining a delayed discharge ...................................................................... 11
2.2 January 2023 Discharge Events .................................................................. 11
3. Delivery Action ................................................................................................ 11
3.1 Good practice ............................................................................................ 12
3.1.1 Reduce length of stay and ensure people are discharged when they are
clinically fit. ........................................................................................................ 12
3.1.2 Getting the basics right ......................................................................... 12
3.1.3 Support already provided ...................................................................... 14
3.1.4 Actions for Best Practice ....................................................................... 15
3.2 Data and Managing Variation ................................................................... 15
3.2.1 Analysis for future planning ................................................................... 15
3.2.2 Using data-driven insights to manage variation .................................... 15
3.2.3 Actions for Data and Managing Variation .............................................. 16
3.3 Workforce ................................................................................................... 16
3.3.1 Labour Shortages ................................................................................. 16
3.3.2 Actions for Workforce ............................................................................ 17
4. Sustaining Change .......................................................................................... 17
4.1 Transparency ............................................................................................... 17
4.2 Measuring Progress .................................................................................... 17
5. Conclusion and Next Steps ............................................................................ 18
ANNEX A – Context ......................................................................................... 19
Short-term pressures on the NHS ..................................................................... 19
Persistent Demand ............................................................................................ 19
Admissions into Acute ....................................................................................... 20
Ageing Population ............................................................................................. 21
Frailty and Deconditioning ................................................................................. 21
Social care vacancy levels .................................................................................... 21
ANNEX B – Delayed Discharge ...................................................................... 23
Reasons for delayed discharge ............................................................................. 23
Trends in delayed discharge ................................................................................. 24
Flow through delayed discharge ........................................................................... 25
ANNEX C – Definition of Discharge Event ........................................................ 26
ANNEX D - Improving Urgent and Unscheduled Care ..................................... 28
Increasing capacity outwith hospitals .................................................................... 28 
Foreword

Page 119

8 
Winter is challenging for the NHS every year, but winter 2022/23 was considerably more so for a variety
of factors, not least the substantial increase in short-term seasonal demand for unscheduled and critical
care due to the combined high incidence of flu, Covid-19 and other respiratory infections. This has placed
exceptional pressure on an already strained system that was working hard to rebuild following the
pandemic and striving to address the ‘backlog’ and meet high levels of demand for elective procedures.
Additionally we have been responding to the deconditioning of those who either were waiting for care or
had their care delayed due to fear of Covid-19 and/or a wish not to add to the strain on the health and
social care system. 
In response to what we knew was going to be a challenging period, the Winter Resilience Plan set out a
number of priorities in preparation for winter. 
Now that seasonal demand is subsiding, this Action Plan reflects on the strong evidence of what we know
works and builds on the firm foundations of best practice to reduce delayed discharges and overall
hospital occupancy, and reasserts the Scottish Government’s commitment to responding to the many
challenges that still exist over the coming weeks and months. The Action Plan sets out the key actions
which should be taken now to address the urgent issues around delayed discharge and high hospital
occupancy we continue to experience and whose impacts are felt across the whole system. Immediate
actions to ensure we are getting the fundamentals right consistently and in a way we can sustain can be
found on pp10-11 of this plan. 
This Action Plan recognises the complexities of the challenges we are facing, whilst also acknowledging
that the demands upon health and social care have changed significantly post-pandemic. Delayed
discharge impacts on length of stay, and exit blocks cause access blocks, hence this plan emphasises the
importance of a whole system response involving hospitals (acute led care), residential care (care homes)
and primary/community care (including care at home). 
As set out in the recent NHS Delivery Plan Guidance for Board Annual Delivery Plans, the health and social
care system must respond at all points along the patient journey, recognising the significant impacts
interruptions to patient flow have on other parts of the system, such as the ambulance service and A&E.
This plan proposes a set of immediate actions to be taken which represent good practice - and
consideration should be given in delivery plans around how to embed and sustain these activities. Flow,
the alignment of the discharge pattern with the admission curve, ensures patients get to the right bed at
the right time and prevents unnecessary consumed capacity or increased length of stay. Working together
across traditional boundaries will help us to improve flow through our acute settings, and delayed
discharge as we work towards winter 2023/24. 
Multi-disciplinary and multi-agency teams are vital in enabling that all-important flow, and in moving the
public away from the notion of doctor-led care as the default, particularly, in the context of this Action
Plan, when it comes to discharge from hospital. Whilst it is impressive that around 97% of all discharges
are without delay, we need to implement actions that we know are effective now to increase that figure
and reduce the pressures we are experiencing across the NHS and in social care.  The 3% of patients who
do go on to be delayed in their care have a disproportionately poorer experience and poorer outcomes,
and their delay consumes a high proportion of capacity (bed days lost). 
In all of our actions, we must bear the principles of realistic medicine in mind: ensuring patients, people,
are involved in decisions about their own care and that we listen to their needs and wants at as early a
stage as we can – particularly with regards to their wishes when it comes to leaving hospital and on into
the care system. We must also recognise the ethical issues surrounding unnecessary, long-term hospital
stays, and we must continue our concerted effort to reduced delayed discharge. Reducing delayed
discharge is not a silver bullet to reducing hospital occupancy, but it is an important element to consider
as part of the package of measures needed to improve flow. We must sustain the changes that have
happened over winter 2022/23 to improve the flow of patients through urgent and unscheduled care,
including, but not limited to discharge without delay.

Page 120

9 
This Plan also recognises that there are challenges that will be difficult to address in the short term, such
as recruitment and retention (in part itself caused by a declining supply of a working age population) and
variability of capacity and demand throughout Scotland. 
But we know from the experience we have gained over the past months what works. This Action Plan
draws together 12 actions we can take immediately under the following areas, with an over-arching aim
alongside other measures of returning occupancy to pre-pandemic levels: 
Good practice – the evidence regarding what works is clear, and we need to adopt this consistently
across both health and social care and ensure there is a continuous focus on evidence-based
improvement. 
Data management – the data tells us the challenge and pressure the system is under, but we need
to ensure that we continue to improve data and information so we move towards a whole system
approach to developing intelligence that can be used to improve health and social care. 
Workforce – vacancy levels (particularly in social care) remain a key challenge and we must do all we
can to support recruitment and retention. 
Whilst the immediate actions set out in this plan are essential in reducing pressure on staff and the
system, assuring patient safety and addressing the ethical issues of unnecessary hospital stays, we must
use these actions and learnings to support our ongoing commitment that people receive the right care in
the right place at the right time. This Action Plan should be seen as a relatively short-term but important
constituent part of our overall improvement agenda that gives assurance that we are as prepared as we
can be for winter 2023/24 and beyond. 
With this longer-term objective in mind, we have commenced our annual planning cycle to help us assess
current capacity against anticipated demand which will include surge activity at times when we know that
the health and social care system is likely to come under increased pressure. This is set out in the NHS
Delivery Plan which covers plans for both 2023/24, and for the medium term. 
John Burns      Angie Wood
NHS Scotland Chief Operating Officer               Scottish Government Interim Director 
Social Care

Page 121

10 
1. Context 
Winter 22/23 has seen extreme pressure across our health and social care system. But the pressures are
not exclusive to the winter months alone. The average length of stay in hospital now stands at 8.4 days,
which is a day longer when compared to the three years before the pandemic. This Action Plan sets out
the issues facing the system and the actions we can take now to address them, with a particular focus on
the bridge between hospital and care settings. There is a clear need to consider the potential social care
needs of patients at an early stage in their hospital journey, and to discuss those with the patient and
their family and current carers. Involving the patient in decisions about their health care and their
subsequent care outwith the hospital setting is vital in both working towards our ambition of putting the
patient’s needs and wishes at the heart of their care path, and in helping smooth the flow of patients as
they transition into ongoing care, where necessary. 
1.1 Older Population 
Scotland’s demographics are being shaped by an increasing older population and while we celebrate that
people are living longer, this does mean that we are seeing a shift in front door presentation: we are
admitting people who are older, with multi-morbidity and higher acuity than ever before. An increasing
older population and the health inequalities which persist in our society mean that many people are
entering their later years in poorer health, frail and with multiple morbidities. All of which is translating
into longer hospital stays and a knock-on impact on the flow of patients through our hospitals and on into
care after hospital. 
1.2 Risks of Longer Hospital Stays 
People being in hospital for longer than necessary is one of the current key issues facing the system,
which presents a number of ethical issues as this can be to the detriment of the patient. Spending too
long in hospital can lead to: 
 risk of deconditioning and frailty
 risk of healthcare associated infection, falls and delirium
 a sense of disconnection from family, friends and usual social networks leading to boredom,
loneliness and loss of confidence
 distress for family and carers who have to spend time and money on regular visits to a hospital that
may be some distance from home 
1.3 Hospital Occupancy 
Hospital occupancy is an important measure as it reflects the pressure in a system and the ability of a
hospital to move patients efficiently through a hospital and to a specialty bed. 
We know that hospital occupancy is high and this in itself is leading to an increased level of clinical risk as
patient care is being delayed, which is most visible in the media coverage of long waits in Accident and
Emergency (A&E) and ambulances queuing as they seek to admit patients. This is of course in spite of
considerable effort being taken to divert the general public to the right place for their healthcare needs
when A&E or a GP practice is not appropriate, and pausing of elective activity in some Board areas in
order to generate capacity in acute settings. 
Pre-covid quarterly official statistics showed that acute bed occupancy was subject to seasonality, running
between 85-89%. Official statistics also show that the medical group of acute beds generally run at a
higher occupancy than the surgical grouping. But we know that in order to reduce occupancy levels to
around these pre-covid levels, it requires a whole system response with both health and social care
working together.  Acknowledging that there are actions that can be taken at every point in the patient

Page 122

11 
journey and implementing those actions we know work now will help relieve those pressures and set us
on a path to better manage the inevitable increased demand we will see in Winter 23/24.   
Further context is given at Annex A. 
2. Delayed Discharge 
2.1 Defining a delayed discharge 
Put simply, a delayed discharge is when a patient remains in a clinical setting when they are deemed to be
clinically fit to be discharged. Importantly around 97% of all discharges from hospital are not delayed.
However, as of 24 February 2023 there are circa 1,800 patients whose discharge has been delayed,
recorded via our management information systems. Whilst addressing delayed discharge is not the only
solution to reduce hospital occupancy, it remains an important element, not least as these statistics
represent people who are in a setting that is not appropriate for their care. It is also important to note
that these figures are management information, are submitted daily, are not revised and have not been
verified. 
Although the detail behind the overall number of patients whose discharge is delayed is often not
reported, it is important to note that there are different categories of delayed discharge. These are
broken down firstly by setting: acute, mental health and community hospitals. Public Health Scotland
share a list of acute hospitals on their Official statistics Delayed Discharge publication and local authorities
follow the same definitions as Public Health Scotland. 
They are further broken down by the type of delayed discharge: a standard delay or code 9 delay. Code 9
delays are when partnerships are unable, for reasons beyond their control, to secure a patient’s safe,
timely and appropriate discharge from hospital. Code 9 delays can be split further into Adults With
Incapacity (AWI) delays and Complex (also known as Code 9: Other delays). These are used where: 
 the patient lacks capacity, is going through a Guardianship process, and for whom the use of
S13ZA of the Social Work (Scotland) Act 1968 is being considered (AWI delay). 
 the patient is delayed awaiting availability of a place in a specialist facility, where no facilities exist
and an interim move would not be appropriate (i.e. no other suitable facility available)
(Complex/Code 9: Other)
 patients for whom an interim move is not possible or reasonable (Complex/Code 9: Other). 
More detail on Delayed Discharge can be found at ANNEX B. 
2.2 January 2023 Discharge Events 
On 17 January 2023, the Chief Executives of NHS Scotland and COSLA wrote to all Territorial Boards, IJBs
and LAs to request a focused discharge event beginning in the week commencing 23 January 2023 as a
means of addressing unacceptably high occupancy rates. This letter includes a clear definition of the
expectations around those events, which can be found at ANNEX C. 
These events proved invaluable, but learnings from these must be implemented, and should now lead to
sustained action, as set out in this plan. 
3. Delivery Action 
It is important that we focus efforts on improving the way we plan, prepare for and execute the discharge
process from all inpatient settings, but particularly from acute hospitals. To do that it will be important

Page 123

12 
that we focus initially on delivering improvements in both discharge from delay and discharge without
delay. But we also need to improve the flow through our hospital settings, not least as it is important we
create the capacity to increase the volume of elective activity some of which has been paused or delayed
as a result of the pressure across the system. It is also and most fundamentally about improving the safety
of our acute systems and avoiding harm. 
The following therefore sets out the actions that are required in the short term to help address the
immediate pressure being experienced, much of which has been communicated previously. 
3.1 Good practice 
3.1.1 Reduce length of stay and ensure people are discharged when they are
clinically fit.   
Patient length of stay can be affected by many factors including patient complexity as already described. 
We also know that two patients with identical complexity and acuity can have very different lengths of
stay in different settings.  This can be affected by system configurations (such as same day emergency
care replacing admission in some settings), system efficiencies (such as delays to access downstream beds
leading to acute de-functioning or delays to treatment), clinical risk thresholds (junior staff having a more
cautious approach to discharging compared to senior staff) and provision of support services such as
variation in follow up, investigation delays or community supports in place. 
We know that for older people with frailty, access to specialist Geriatric Medicine beds reduces the risks
of death or nursing home at discharge1.  We also know that delays to access specialty older people’s beds
directly correlates with longer lengths of stay such that every day’s delay in accessing a specialty bed adds
three days onto the overall length of stay2. 
3.1.2 Getting the basics right 
The objective of this plan is not just about reducing occupancy as a measure, but this is important in
mitigating risk factors such as hospital associated infections and thus a measure of patient safety. We
have work already underway through the Discharge without Delay (DwD) programme. Evidence suggests
that leadership must be committed to continuous focus on good discharge processes and be relentless in
the pursuit of good practice every time. 
The majority of NHS Board/partnerships have engaged with DwD and will shortly be provided with a DwD
care bundle which supports acute wards to plan effectively with patients and carers from admission, and
sets out the approach to wider-MDT planning for more complex patients. Leadership across the health
and social care system should ensure that this best practice is applied reliably and consistently and
monitored for effectiveness. 
Reducing occupancy levels is a whole-system aim, with action incumbent on each component part of the
system to deliver it. In acute sites, that means optimising in day flow through early and effective discharge
planning and preparation (using a planned date of discharge (PDD) approach) leading to pre-noon and
weekend discharges. In community teams, a PDD approach means contributing to discharge plans, from
admission, and responding to the ‘queue’ in advance of completion of treatment.  There is strong                                                            
1 Ellis G, Gardner M, Tsiachristas A, Langhorne P, Burke O, Harwood RH, Conroy SP, Kircher T, Somme D,
Saltvedt I, Wald H, O'Neill D, Robinson D, Shepperd S. Comprehensive geriatric assessment for older adults
admitted to hospital. Cochrane Database of Systematic Reviews 2017, Issue 9. Art. No.: CD006211. DOI:
10.1002/14651858.CD006211.pub3 
2 SCoOP Acute Hospitals Outcome Report 2018-2019 reduced.pdf (abdn.ac.uk)

Page 124

13 
evidence of system and individual benefit from focus on whole system wraparound in the first 48 hours of
admission, supporting discharge and avoiding further deconditioning of patients. 
The work we have undertaken over the course of the winter has led to a richer and deeper understanding
of what works and much of this has been communicated out to both the NHS and Social Care systems.
The discharge intervention undertaken in January 2023 in all systems with a targeted and focused
approach to ensuring all patients discharge is being effectively managed has also given some critical
learning. The combination of all of this has led to the creation of a package of measures that we know has
an impact on reducing delayed discharge and improving flow. 
There is very little in this package that is necessarily new or novel, but there is extensive evidence to
support that when in place and used collectively and consistently, these actions can deliver big
improvements in the discharge process and flow. We would therefore ask that the following measures
be continued and/or implemented, and sustained, as a matter of priority: 
GETTING THE BASICS RIGHT
TO PREVENT DELAYED DISCHARGE AND IMPROVE FLOW 
 Implement admission avoidance, locality rapid response wrap-around models, care
management, multiagency input at the front door approaches. Whole-system input at an
early point in the first 48 hours of admission to engage patient/family/carers in discharge
discussions and prevent deconditioning of patients. 
 Ensure the social care needs of patients are considered on every ward and that there is
social work input into wards with high frailty and ongoing care needs. Service
managers/care at home managers should attend ward rounds (this may be virtually) to
understand/challenge referrals, manage and mitigate risk or perceived risk, provide
expert advice and engage in planning and preparation for discharge as part of wider MDT
discussions. 
 All systems should implement Discharge without Delay principles to plan together as the
patient recovers, and jointly set a Planned Date of Discharge – using the PDD bundle to
aid implementation and reliable and consistent practice. Every patient must have a
planned date of discharge, reviewed daily and this be used to plan and prepare in real
time. 
 Senior decision-making should happen with multi-agency teams, with regular
communication and visibility of the plan. Daily senior oversight and escalation in both
Health Boards and HSCPs/LAs should be in place to prevent/resolve delay-causing issues.
Utilise performance data to apply continuous improvement to any emerging systemic
issues. 
 Structured ward rounds or white board assessment 7 days per week to ensure there is a
plan for every day, which sets out tasks for the day and agrees the ward round priority
order (sick, discharges, others) alongside parameters for criteria-led discharge to support
early discharge. 
 Commission/organise care in response to the pipeline of upcoming work (patients
approaching their PDD), not just when patients are delayed. 
 Early identification of complex discharges and appropriate referral as soon as possible.
Every older person with frailty should have a clinical frailty score identified on admission
to the ED or the admissions ward and appropriate referrals for specialist care made in

Page 125

14 
accordance with local guidelines as well as early identification of needs (Medical, Mobility
and self-care, Medicines, Mental Health, Me and Mine – family and carer support, and
What Matters to Me) on admission with onward referral to appropriate professions and
coordinated multi-agency team management. 
 Earliest possible engagement with families/carers to manage expectations, recognising it
is not a valid option to remain in an acute setting once clinically fit to be discharged. 
 Implement discharge to assess models and intermediate care (bed or team) to support
discharge home, wherever possible patients should not be assessed for ongoing care
whilst at their most vulnerable or in an unfamiliar environment. Use community
rehabilitation as the preferred place of recovery and intermediate care (and interim care
home beds in the short-term) with a clear recovery plan in place. 
 Implement discharge to assess models and intermediate care (bed or team) to support
discharge. Use community rehabilitation as the preferred place of recovery and
intermediate care (and interim care home beds in the short-term) with a clear recovery
plan in place. 
Although all of these are important, perhaps one of the most critical is the need to ensure it is truly a
whole system, person-centred approach based on the fundamentals of realistic medicine. It is therefore
essential that social care, social workers, clinicians, families and critically the patients themselves work
together in lockstep. Notwithstanding that this may require life-changing decisions to be taken –
particularly following what could be a prolonged stay in hospital. 
3.1.3 Support already provided 
A range of additional support and supporting materials have been prepared and issued to delivery
partners to support the health and social care system. Additional funding of £528m was allocated directly
to Health and Social Care Partnerships for 2022/23. This funding was aimed at the following social care
measures:
 £124m to enhance care at home
 £144m to support the December 2021 uplift to £10.02, as well as a further £200 million to increase
the minimum hourly rate of pay in adult social care to £10.50 in 2022/23. This will rise to £10.90 in
2023/24
 £20m to support interim care arrangements
 £40m to enhance multi-disciplinary teams so that more social work assessments can be carried
out, and to support joint working between health and social care 
This funding was designed to maximise capacity, ensuring flow through the system. 
Over and above this an additional £8m was made available in January 2023 to support up to 300 extra
interim care home beds as there was evidence that there was capacity in the system that was unable to
be used without additional funding. 
All of this builds on the existing investment to support activity to alleviate pressure such as the £62m to
expand Care at Home and support an increase in the use of community equipment and Technology-
Enabled Care (TEC) where appropriate supporting prevention and early intervention. 
Work has also been undertaken to support Health Boards and HSCPs to support patients and their
families who have been classified as AWI as we know in those areas where best practice is implemented,
it can dramatically reduce the delays for these patients

Page 126

15 
A programme of meetings with all HSCPs is underway, beginning with those with the highest number of
AWI delays per population. Each pinch point in the guardianship system and S.13ZA is examined with the
HSCPs to see where improvements can be made and support provided. Good practice has been shared
with HSCPs. Work is underway to identify emerging issues and develop a good practice paper in advance
of next winter. We are considering whether it would be helpful to supplement this with a webinar where
good practice can be discussed and an update given on plans to reform AWI legislation in the short to
medium term. 
The work with HSCPs has been supplemented by joint statements on AWI practice by the Scottish
Government with the Mental Welfare Commission and COSLA.  
3.1.4 Actions for Best Practice 
1 All systems to review and implement learning from their
discharge event to embed improvements in an ongoing,
‘business as usual’ way
Boards and IJBs to confirm
this has  been actioned by
end March 2023
2 Put systems in place to provide the assurance necessary to
confirm the measures set out in ‘Getting the Basics Right’
are consistently being applied
Boards and IJBs  to
confirm this has been
actioned by end April
2023
3 SG will continue work with NES to develop a toolkit of
support and training materials to support discharge
Toolkit and materials to
be available by end April
2023
4 Boards and IJBs  to assess their systems and processes in
terms of acute discharge planning and apply the DwD
toolkit in every inpatient area, community hospitals and
other off-site beds
Boards and IJBs to confirm
this has been actioned by
end April 2023 
3.2 Data and Managing Variation 
3.2.1 Analysis for future planning 
The work to gather and analyse data undertaken thus far has enabled a better understanding of the
pressures being experienced across the health and social care system, but also provides us with a
platform to consider how we can support future operational planning. Notwithstanding the IJB’s statutory
strategic planning function, work is underway to provide modelled forecasting based on demography and
historical demand trends to support future planning. This should also help local partners develop a good
understanding of future demand based on their current capacity within both care at home and the care
homes within their geographical area. 
3.2.2 Using data-driven insights to manage variation 
Although the vast majority of local systems have detailed and granular data, we know that the quality of
information is often not as robust or consistent as we would wish, given the different local systems in
place and the number of different providers across the country. Within Social Care we also have not
developed routine mechanisms to share information with local decision makers, but work is in hand to
address this. 
Supported by analytical and digital colleagues within the SG, a tactical social care dashboarding solution is
currently in development to support HSCPs and HBs to have access to a core set of indicators to enable
consistent and comparable data to be available at different levels of geography. A cross-organisational

Page 127

16 
forum will also be established to improve data collection including a review of methodology, processes
and indicators. 
In parallel, joint SG/PHS/NSS work has now commenced looking at how to provide existing and robust MI
data for insights across health and social care using NSS’s Seer2 platform alongside this faster-paced work.
This work sits within the wider context of the Data Strategy for Health and Social Care Greater access, better
insight, improved outcomes: a strategy for data-driven care in the digital age (www.gov.scot) and will report
into the Data Board for Health and Social Care. 
3.2.3 Actions for Data and Managing Variation 
5 SG to provide a tactical social care dashboarding solution to
support HSCPs and HBs to have access to a core set of
indicators, predicated on existing and robust management
information to enable consistent and comparable data to
be available at different levels of geography
Dashboard to be available
by end April 2023
6 SG to provide modelling of potential future demand to
support more effective local planning
Modelling to be available
by end April 2023
7 SG to support partners to develop forum to drive work
towards more consistent and comprehensive data
Forum to be established
by end March 2023
8 SG/PHS/NSS to provide a strategic solution for the delivery
of MI data for insights across health and social care using
NSS’s Seer2 platform
Solution to be agreed by
end May 2023 
3.3 Workforce 
3.3.1 Labour Shortages 
We know there are significant recruitment challenges within Health and Social Care and particularly when
compared to other sectors such as hospitality and retail. Social care in particular has been identified as an
area with high levels of vacancies. A critical question is how to grow the care home workforce to
accommodate higher occupancy levels. The actions set out below aim to address labour shortages across
the sector. 
Staff demand for Healthcare and Social Care workers for the week to 13 January was 22.1% below the
pre-pandemic baseline (February 2020). However, this data may obscure differences in demand between
the health and social care sectors. So whilst it is important to take the action necessary to recruit
additional staff, it is equally important to ensure that staff within the sector feel sufficiently valued and
appreciated in order to retain this critical workforce. 
Staffing challenges in Social Work are also having an impact on the ability to discharge patients from
hospital, given this sector’s statutory role in assessment and support planning (including the public
protection role of Social Work). A workforce improvement plan is being developed jointly by COSLA and
SG to address the immediate recruitment and retention issues for the Social Work workforce.  This
includes reserves lists, international recruitment and widening access into the profession through a fast-
track route and graduate apprenticeships. 
There is reason to think that current pressures in social care may be a more significant contributor to
delayed discharges than they were in the past, and that resolving the social care capacity crisis is vital if
we are to improve discharge rates. The number of social care workers in Scotland decreased from 2020 to
2021 and there is no reason to think that it has increased significantly since then. Therefore work will

Page 128

17 
continue to support Social Care Workforce capacity to undertake assessment of need and care planning
required for hospital discharge. 
3.3.2 Actions for Workforce 
9 SG to support local partners through NES to utilise
international recruitment
Ongoing
10 Continue to pursue national recruitment campaign Ongoing
11 Continue to pursue recruitment activity with DWP for
Ukrainian displaced people and UK residents that are
economically inactive
Ongoing
12 Increase in pay to £10.90 per hour in 23/24 for adult
social care sector in commissioned services. Looking at
improvements to terms and conditions for adult social
care in 2023/24
April 2023 and ongoing 
4. Sustaining Change 
Winter often results in both the NHS and Social Care experiencing the greatest pressure and involves
many of the partners developing and implementing winter plans. But given what we know, it is essential
that we mitigate against the need for crisis responses and develop Annual Delivery Plans that recognise
there are peaks of demand and challenges at various points. 
We believe it is important to continue to focus on reducing discharges from delay as a priority, given the
resultant impact on overall hospital occupancy and system flow, and indeed given the disbenefits to
patients themselves of keeping them in a hospital setting unnecessarily. 
ADPs should, however, also focus on increasing discharges without delay once the delays pool has
reduced in size. We will then, consequently, expect to see higher levels of patients being discharged
without delay. 
This focus will support the wider whole-system approach to limiting hospital occupancy to safe and
effective levels, which in turn will enable us to more quickly address the backlog of elective care
exacerbated by the pandemic.  Whilst not proposing to set a new target as such, we recognise
stakeholder views that 85-90% generally represents a safe level of occupancy, and slightly higher (up to
92%) can perhaps be justified in certain local and short-term circumstances.  As outlined earlier, reducing
delayed discharge will not necessarily of itself reduce hospital occupancy to safe and effective levels, but
it is an important element of the package of measures needed to improve flow. 
4.1 Transparency 
We intend to use this data on a weekly basis and fully expect local systems such as all Integrated Joint
Boards to be actively monitoring, managing and sharing delayed discharge statistics as part of their core
responsibilities. We also fully expect local systems to be making the necessary resource decisions to
support these responsibilities to those they are accountable to through the Integrated Joint Board. 
4.2 Measuring Progress 
The number of people whose discharge has been delayed remains stubbornly at around 1,800 across
Scotland. We would expect that as we move past peak demand and towards the quieter summer months,
this will move towards pre-pandemic levels (c1,400-1,550).

Page 129

18 
Hospital occupancy levels of c85-89% - also pre-pandemic levels – remain a target which Boards are
working towards using the range of measures available to them, including the actions in this plan. 
Currently, 97% of discharges are without delay, which is very encouraging, but again, it is important to
focus on increasing this number to continue to free up flow. 
5. Conclusion and Next Steps 
As outlined earlier, this action plan is intended to both highlight the broad-ranging work that is happening
to improve hospital occupancy in both the short and medium term, and to set out the clear steps we
know work that we can take now and in the coming weeks to address the urgent situation regarding
discharge and occupancy we have been facing over winter. We must collectively direct resource and
effort to focus on these actions in the short-term, and bake them into longer-term planning via ADPs. We
know Winter 2023/24 will again be demanding for the health and social care system, but with the
knowledge and tools we have, we have strong evidence pointing to where we should be focusing
attention to ensure we are as prepared as possible to mitigate the spikes in demand on the system. 
It is only in collaboration between the NHS and social care – including with patients themselves – that we
will be able to meet the stretching targets we have set in this paper. But we know that for the sake of our
staff and patient safety, and to begin now to mitigate future challenges, we must be ambitious and
purposeful in attempting to meet and exceed these targets.

Page 130

19 
ANNEX A – Context 
Short-term pressures on the NHS 
As outlined above, we also know there is short-term demand due to high incidence of flu in particular,
along with Covid-19, RSV, Group A strep and other respiratory infections that have placed exceptional
pressure on an already strained system. This is compounded by the indirect consequences of Covid-19
which has led to diagnosis and/or treatment being delayed. All of this has translated into increased
deconditioning of patients upon admission to hospital which in turns leads to increased length of stay and
the need for a more complex care package (if applicable) in place on discharge. 
Furthermore, early and high impact flu seasons also have a direct impact on our acute settings. The
numbers of hospitalised patients who tested positive for influenza reported in weeks 51 and 52 of 2022
(1319 and 1283, respectively) were higher than those reported for any week since the start of the
2016/2017 season. 
Persistent Demand 
But beyond the short-term pressure, wider demand on the NHS is continually having an impact due to an
ageing population, disease morbidity, health inequalities (potentially compounded by the pandemic).
These increase the demand for health and care services.   
NRS report that life expectancy has fallen in 2018-20 and 2019-21 and that healthy life expectancy has
also been decreasing in Scotland, resulting in a lower proportion of life being spent in good health, which
may have implications for both demand and supply of social care. In 2019-21, life expectancy at birth in
Scotland was 76.6 years for males and 80.8 years for females. The gap in life expectancy between the
most and least deprived Scottish Index of Multiple Deprivation (SIMD) deciles was 13.7 years for males

Page 131

20 
and 10.5 years for females. Meanwhile population ageing continues and the number of over 85s, who are
more likely to have complex and multiple health and care needs, is projected to double in 20 years. 
A recent cross-sectional study which linked national health and social care data to explore multimorbidity
and social care use in those aged over 65, found that 93.3% of those receiving social care had
multimorbidity, and that 16.2% of those with multimorbidity had received social care, compared with
3.7% of those without. 
In addition to the acute pressures, the wider context is that the number of people requiring social care is
steadily increasing as a result of the population pyramid and increases in the burden of disease.
Population projections indicate that the proportion of older people in the population, who typically have
greater care needs, is increasing. This is alongside the impact of more people living with a disability or
disease. 
Admissions into Acute 
However, we are not seeing an increase in acute admissions. The following presents a summary of
emergency admission data alongside A&E performance: 
The shift in admission levels is due to multiple factors, including significant change in clinical pathways
and investment to enhance out-of-hospital based care to ensure that patients receive the most
appropriate care in the right setting for their needs. 
We are also making significant efforts to double our hospital treatment in the home through priority
pathways including Hospital at Home, Outpatient Parenteral Antimicrobial Therapy and Community
Respiratory Teams.   
Our virtual capacity now provides acute care the equivalent to the size of a large teaching hospital, again
reducing admissions.

Page 132

21 
Additionally, many patients spend longer in A&E receiving care and are discharged directly from the
Emergency Department, due to capacity pressures elsewhere in the hospital. 
There has also been an increase in pathways which provide rapid assessment and streaming out of the
Emergency Department and prevent admission, such as Same Day Emergency Care. 
Ageing Population 
Social care demand is affected by the ageing population and increased prevalence of long term
conditions3. Scottish Health Survey data provides evidence that the proportion of people living with
limiting long-term conditions increases with age4. Population projections indicate that the proportion of
older people in the population, who typically have greater care needs, is increasing. This is alongside the
impact of more people living with a disability or disease.5 
NRS analysis has further found that life expectancy has been stalling and healthy life expectancy has been
decreasing in Scotland, resulting in a lower proportion of life being spent in good health6, which will have
implications for both demand and supply of health and social care. 
Frailty and Deconditioning 
In older people deconditioning can happen really quickly – 24 hours in bed can reduce muscle power by 2-
5%, and in 7 days up to 20%, mostly in lower limbs which may be the difference between being able to
walk or not. We know prevention is much more effective than treatment, and while deconditioning is, in
theory, reversible, most older people do not regain their prior functionality and independence
(https://thecareruk.com/deconditioning-the-warning-signs-and-how-to-prevent-it/).   
A survey conducted in Autumn 2022 examined reasons for increased length of stay compared to 2019/20
and highlights the impact of deconditioning. Health Boards were invited to complete the survey and 9/14
responded. Most Health Boards confirmed that they had an increase in bed days for patients with femur
fractures, and frailty related conditions.  High occupancy levels have been affected by COVID-19, with
lockdowns impacting physical deconditioning due to reduced mobility. 
Social care vacancy levels 
Compounding this are the challenges in the social care sector, specifically in relation to staff vacancies and
retention which in turn are making it more difficult for care to be provided in the community (care at
home) but also to provide timely discharge from hospital. The following is an outline of reported staff
vacancies within both care homes and the care at home sector, although it should be noted that this data
is unpublished management information and therefore the quality and return rate is not as robust as
other data sources. It is reasonable to conclude that the consistent high levels of vacancies in social care
services could have a bearing on the waits for care packages as outlined above in the reasons for standard
delayed discharge. 
3 Demand and expenditure for adult social care in Scotland | FAI (fraserofallander.org)
4 Summary - The Scottish Health Survey 2021: summary report - gov.scot (www.gov.scot)
5 Population Projections Scotland | National Records of Scotland (nrscotland.gov.uk) 
Scottish Burden of Disease Forecasting Briefing (scotpho.org.uk) 
6 Healthy Life Expectancy decreases | National Records of Scotland (nrscotland.gov.uk)

Page 133

22 
Published figures from the Scottish Social Services Council (SSSC) show that, in 2021, the percentage of
whole time equivalent (WTE) vacancies in care homes for adults was 7.9% compared to 5.4% in 2019. 
According to the RBS report on Jobs7 in December 2022 the strongest upturns in demand for permanent
staff were seen across the Nursing/ Medical/Care and IT & Computing sectors.  Nursing/Medical/Care also
ranked second in strongest increase in demand for temporary staff among the eight monitored sectors. 
Hospitality and Retail have been identified as potential sectors that may be in competition for labour with
social care.  These sectors are characterised by notable proportions of jobs with low entry qualifications. 
In 2020, 49% of jobs in Accommodation & Food Services and 12% of jobs in Wholesale & Retail were
classed as Occupation Skill Level 1, compared to a Scottish average of 9.9%.8  But even within these areas
are experiencing challenges as the Business Insights Conditions Survey (BICS) indicate that 49.1% of
Scottish Accommodation & Food Services businesses experienced difficulties filling vacancies in
November 2022, compared with 38% of Scottish businesses overall, and 34.4% of businesses in Wholesale
& Retail9.   
Social care providers are also very clear that they continue to lose staff to the NHS which has much better
pay and conditions in comparison to social care staff, they anticipate that this will only get worse with the
anticipated 23/24 NHS pay uplift. Entry level pay for adult social care in commissioned services will be a
minimum of £10.90ph from 2023/24. The current Agenda for Change Band 3 minimum is £12.23ph and
the expected increase for 23/24 is currently £13.03ph. This is £2.13ph above the social care minimum
rate. 
Finally, pay is often cited as a predominant factor relating to staff vacancies in this sector as despite this
workforce being certified and regulated by the minimum £10.50 hourly social care wage. For comparison
supermarket and retailers hourly pay ranges from £9.75 to £11 and NHS Staff at level 1 earning around
£12.23 per hour. 
7 RBS report on Jobs, December 2022.  Results based on responses to questionnaires sent to a panel of around 100
Scottish recruitment and employment consultancies.
8 Scotland’s Labour Market: People, Places and Regions – background tables and charts - gov.scot (www.gov.scot). 
Level 1 occupations are those which equate to a competence associated with a general education and may require
short periods of work-related training (e.g. bar staff, cleaning).
9 Business Concerns - BICS weighted Scotland estimates: data to wave 73 - gov.scot (www.gov.scot)

Page 134

23 
ANNEX B – Delayed Discharge 
Standard delays refer to all delays other than Code 9 delays. The following is a table breaking down
delayed discharge by setting and type of delay between 23 November 2022 and 25 January 2023. 
The above table demonstrates the split across setting and type of delay: of the 1,764 delayed discharge
(of 18/01/23) 50% were in acute, 15% were in mental health and 35% in community hospitals. 
These data are management information, are submitted daily, are not revised and have not been verified.
However, this level of detail helps us to understand what lies behind the headline figure to manage flow.   
Although, standard delays have increased from about 900 in June 2021 to almost 1,300 in December 2022
(higher than a pre Covid-19 pandemic average of 1,100 delays). The following illustrates the trend of
delayed discharge by category over time: 
Reasons for delayed discharge 
The majority of standard delays (about 70%) are usually waiting for suitable care arrangements in order to
live at home (due to unavailability of services) or a place in a nursing home, and a post-hospital social care
Standard AWI Complex Total
Acute Standard AWI Complex
Total
Mental
Health
Standard AWI Complex
Total
Community
Hospital
23/11/2022 692       191     20       903     180       32       52       264     483       182     12       677              1,844 
30/11/2022 668       189     33       890     175       36       56       267     468       171     11       650              1,807 
07/12/2022 681       181     41       903     168       37       56       261     471       175     18       664              1,828 
14/12/2022 646       183     41       870     160       44       51       255     454       170     32       656              1,781 
21/12/2022 673       186     44       872     158       41       58       288     446       169     29       644              1,804 
28/12/2022 605       185     42       832     150       37       61       248     433       171     29       633              1,713 
04/01/2023 624       174     46       844     143       38       62       243     463       163     26       652              1,739 
11/01/2023 628       176     46       844     147       40       56       248     473       151     24       649              1,741 
18/01/2023 665       176     35       877     154       42       64       260     455       158     14       627              1,764 
Change -27 -15 15 -26 -26 10 12 -4 -28 -24 2 -50 -80
% Change -4% -9% 43% -3% -17% 24% 19% -2% -6% -15% 14% -8% -5%
Date
Acute Mental Health Community Hospital
All
Delays

Page 135

24 
assessment as their principle reason for their delay at the monthly census point. Other reasons may
include: 
 awaiting commencement of post-hospital social care assessment 
 non-availability of statutory funding to purchase Care Home Place 
 non-availability of statutory funding to purchase any Other Care Package 
 awaiting place availability in Local Authority Residential Home
 awaiting place availability in Independent Residential Home
 awaiting place availability in Specialist Residential Facility for younger age groups (<65)
 awaiting place availability in Specialist Residential Facility for older age groups (65+)
 awaiting place availability in care home (Dementia bed required)
 awaiting place availability in an Intermediate Care facility
 awaiting completion of care arrangements for care home placement
 awaiting completion of care arrangements in order to live in their own home – awaiting
procurement/delivery of equipment/adaptations fitted
 awaiting completion of care arrangements - re-housing provision (including sheltered housing and
homeless patients)
 awaiting availability of transport 
The following illustrates the principle reasons over time: 
From the above chart, we can see that waiting for care arrangements in order to live at home is the most
common reason for delays at the monthly census point. Between June 2020 and December 2021 this
percentage has increased to a peak of 48%. Overall, this percentage has been decreasing since December
2021, with a slight increase in November 2022 to 41%. 
Community demand is complex and depends too on competing demands for mental health and drug &
alcohol services as well as for social care packages and social work support. 
Trends in delayed discharge 
Published data indicates the number of delayed discharges in November 2021 was 1,539, which when
compared to the 1,977 seen in November 2022, equates to an average growth of eight additional delays
per week in the year up to November 2022. Although this sounds like a small amount of growth, this
mounts up over time. Which leads to the conclusion that the system needs to be calibrated to deal with
this higher throughput.

Page 136

25 
On analysing the trends in delays that were discharged from 2016 to 2022, both the average length of
stay prior to delay and the average length of delay have risen higher than pre Covid-19 levels. 
The chart on the left hand side shows that the average length of stay prior to delay has increased since
the Covid-19 pandemic (about 20 days before the pandemic) and is now higher than the pre pandemic
levels (27 days in December 2022): a 35% increase. The chart on the right hand side shows that the
average length of stay at the point of discharge has increased from about 7 days before the pandemic to a
peak of 13 days, in August 2022, and has decreased to an average of 10 days in December 2022: a 43%
increase from the pre-pandemic levels. 
Flow through delayed discharge 
It is however important to note that the total number of recorded delayed discharges is only a snapshot in
time. Patients in delayed discharge can become delayed as well as resolved and discharged, resulting in a
constant flow of patients. 
If the flow of new patients into the delayed discharges pool is greater than the flow of patients being
discharged or removed through other pathways, the delayed discharges will increase. For example, 1,557
people were discharged following delay in November 2022 but the total delayed discharges still grew by
67 from October, (1,910 to 1,977). 
As outlined, the length of delay can also vary. For some patients their discharge can be delayed by only a
few days and for others by much longer. There is therefore clear evidence that more needs to be done to
both increase the number of discharges from delay and reduce the number of patients becoming delayed
in the first place.

Page 137

26 
ANNEX C – Definition of Discharge Event 
Below is an excerpt from the letter to Boards, IJBs and LAs from Chief Executives of COSLA and NHS
Scotland of 17 January: 
Discharge intervention required 
It is now necessary to undertake an urgent and focused piece of work in every health board and health
and social care partnership area to meticulously review all patients currently in in-patient care across
acute and community hospitals. It should be noted that none of the activity proposed is new but this is a
renewed and joint focus on taking forward actions appropriate for your area, reflective of your specific
challenges. 
This review should focus on all opportunities to set Planned Dates of Discharge (PDD), discharge patients
home or to a homely setting and ultimately improve patient flow across the system. The review process
should engage joint clinical and community health and social care operational teams from across the
whole system and ensure that feedback and intelligence is triangulated with immediate action. It is
expected that this approach will be supported by identification of additional interim and permanent
placements. Alongside ongoing work to support PDDs, any reason for patient delays and the patient’s
discharge plan must be considered for immediate resolution. 
Poorer outcomes for patients who have a longer stay in hospital than necessary are well evidenced, and
current pressures are increasing this risk. In all discussions with patients, their unpaid carers and families
we must ensure a clear understanding of this potential for harm. Remaining in hospital is not a safe choice
when clinically and therapeutically fit for discharge. 
It will be essential that this exercise accounts for the changed risk profile for our acute systems at this
time, recognising the risk to patients whose care and treatment is delayed with best efforts being
achieved to support early discharge and prevention of further delay. Initiatives and services which
support Discharge to Assess, plus choice and safety must inform decisions. The skills and knowledge of
the community teams should contribute to assessment of risk. The Discharge without Delay and PDD
approach should continue as an organisational priority. Information and guidance can be found on the
Turas website: learn.nes.nhs.scot/63373   
With urgency, whole-system teams must mobilise to operationalise and deliver this review. We are asking
you to use this week commencing 16 January to prepare for this and agree an implementation plan with
the review to begin week commencing 23 January across all acute and community sites. This will require
visible leadership from both Accountable Officers and from all Professional Leaders. It is essential that this
activity translates into a sustained overall increase in all possible discharges from these settings, including
those deemed in delay, to release the much needed capacity within hospital settings. 
In practice we are asking you to work across the system to take forward a combination of actions. 
The following tools are considered best practice and useful in the identification of the tasks or services
which contribute to delay, and support robust evidence-based action and improvement planning: 
• Day of Care Audit: Used by most health boards regularly to understand delay in their systems, should
form the basis of whole-system improvement planning discussions (guidance and toolkit attached to this
letter); 
• MADE: (Multi-Agency Discharge Event) an English approach adopted by many health boards to discuss
and problem-solve existing delays. The guidance can be found here: england.nhs.uk/south/wp-
content/uploads/sites/6/2016/12/rig-multi-agencydischarge.pdf

Page 138

27 
• Criteria To Reside: used as a snapshot or a daily process to capture delay information and find solutions.
Information can be found here on the definitions: england.nhs.uk/publication/process-and-definitions-
for-the-daily-situation-report/. (A ‘what why how’ poster is attached to this letter which explains the
context and how this information is used locally). 
Each area should prepare and hold a live list of all patients with PDDs as well as those patients who are
delayed. PDDs should be reviewed daily to ensure timely discharge. Patients who are delayed should have
a plan which is reviewed daily as a whole system and any mitigating actions taken to resolve this as soon
as possible. 
You should ensure the appropriate local governance is in place to actively pursue and monitor the
outcomes from the review on a daily and weekly basis. Further information on the expectation of national
reporting to evidence the impact of this approach will be provided in the coming days.

Page 139

28 
ANNEX D - Improving Urgent and Unscheduled Care 
Increasing capacity outwith hospitals 
We know that services managing demand must include both preventing the estimated 20% of admissions
that are thought to be preventable.  It must also include increasing alternatives to hospital admissions
where services to provide acute specialist input at home (virtual capacity) exist for acute conditions that
would normally need hospital admission. We know that these services are cheaper, safe and preferred by
patients. 
It is important to focus on the wider system that impacts on flow, capacity, demand and ultimately results
in delays across the system. Key priorities are to reduce inappropriate attendances to ensure the Right
Care is delivered in the Right Place at the Right Time; avoiding unnecessary admissions that keeps care as
close to home as possible; reducing length of stay to ensure patients are discharged when clinically and
therapeutically fit; and avoiding delay wherever possible. This is underpinned by a collaborative
improvement programme that supports improvement in systems and process that reduces unwanted
variation and failure demand. 
The redesigned Urgent Care Programme focusses on reduced unnecessary attendances by signposting
and triaging to more appropriate care. Where possible attendances at A&E services can be scheduled to a
more appropriate service at the right time. This process has reduced self-presentations by circa 13% with
an ambition to continue to improve through initiatives such as Call before you convey, which has proven
particularly successful for care homes, and for pathways such as low risk chest pain. 
The Virtual Capacity programme focusses on keeping care as close to home as possible. Increasing out-of-
hospital care to reduce attendances and admissions through priority pathways helps to develop a virtual
hospital that improves outcomes, increases capacity and reduces risk of nosocomial infections. Current
aims are to: 
 Increase Hospital at Home services by 50% 
 Spread successful OPAT services to all Health Boards
 Establish Respiratory pathways
 Develop case for other pathways of care such as Heart Failure
 Using data to monitor and drive increases in performance
 Supporting MDT collaboration and shared understanding of risk
 Embed governance & oversight strategic functions in an integrated manner
 Review next steps to develop urgent care – OOHs/SAS/NHS24 
Improving Flow through the whole system will reduce length of stay and will be supported by consistent
systems and processes that improve communication across multidisciplinary teams and multi- agency
organisations to reduce variation.

Page 140

1 
REPORT 
Item No: 9 
SUBJECT: Winter Plan Business Case Progress Report
TO: Integration Joint Board 
Lead
Officer for
Report:
Morag Dendy, Head of Planning, Performance & Quality
Assurance 
Author(s)
of Report
Graeme Cowan, Senior Manager, Strategy & Performance 
DATE: 17 May 2023 
1. PURPOSE OF REPORT 
This paper is coming to the IJB for: 
For approval ☐ For endorsement ☒ To note ☐ 
2. ROUTE TO THE BOARD 
This paper has been: 
Prepared
By:
Senior
Manager,
Strategy &
Performance 
☐ Reviewed
By: 
Head of
Planning,
Performance
& Quality
Assurance 
☐ Endorsed By: ☐

Page 141

2 
3. RECOMMENDATIONS
It is recommended that the IJB Committee: 
(1) Endorse and support the progress reports of each of the workstreams which
comprise the Winter Planning & Enhance Supports Business Case 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 The Scottish Government allocated additional funding in 2021/2022 and
2022/2023 to increase capacity across the health and social care system. In
February 2022, the Integration Joint Board approved a business case for the
commitment of the additional funding, while also taking the opportunity to
target nonrecurring reserves to implement a series of proposals, including the
development of a Home First model in North Lanarkshire, additional
community nursing capacity, enhanced care at home capacity, and additional
infrastructure supports. This report provides an update on the progress made
with implementing these proposals.
5.2 Within each phase of the implementation process, the business case
proposals have been re-evaluated both within workstreams and through the
Strategic Commissioning Plan Programme Board. Implementation plans are
revised and reconfigured regularly to reflect the reality of recruitment
challenges, the funding available and the outcomes achieved through the
preceding phases.
5.3 The original aims of the business case were to increase assessment and
planning capacity across the system and enhance direct provision of supports
and services across a range of organisations. Workstreams have been
established to implement plans and proposal against the following headings: 
 Home Assessment Team & Enhanced Integrated Rehabilitation
Provision
 Community Nursing
 Increased Capacity Across Home Support Service, Equipment and
Adaptations Service, Community Alarms Service & Assistive
Technology
 Hospital at Home
 Building Capacity of Independent Sector Providers  
 Investment in Communities   
Yes  ☐ No ☒ N/A ☐

Page 142

3 
5.4 Progress updates on each of the workstreams are attached to the report as Appendix
One, offering a summary of progress-to-date and planned future actions. 
6. CONCLUSIONS
6.1 Progress continues to be made to implement the business case and
undertake the recruitment as approved in order to progress the necessary
change activity in line with the Scottish Government funding allocations.
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and
wellbeing and live in good health for longer 
☒
People, including those with disabilities or long-term conditions, or
who are frail, are able to live, as far as reasonable practicable,
independently and at home or in a homely setting in their community
☒
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health
inequalities 
☒
People who use Health and Social Care Services are safe from harm ☒
People who work in Health and Social Care Services feel engaged
with the work they do and are supported to continuously improve the
information, support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of
Health and Social Care Services 
☒
7.2 ASSOCIATED MEASURE(S) 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes  ☐ No ☐ N/A ☒

Page 143

4 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Choose an item. 
7.5  PEOPLE 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
EQIA added to website: 
8. BACKGROUND PAPERS   
9. APPENDICES
Appendix one – Business Case Workstream Updates 
Appendix two – Summary of Winter Planning Funding & FTE 
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please
contact Graeme Cowan CowanG@northlan.gov.uk 
Yes  ☐ No ☒ N/A ☐
Yes  ☐ No ☐ N/A ☒

Page 144

5 
Direction from North Lanarkshire Integration Joint Board
(IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by
IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke
a previous direction – if
yes, include reference
number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed

Page 145

Appendix One 
Winter Planning & Enhanced Supports Business Case – Workstream Updates 
Workstream Home Assessment Team & Enhanced
Integrated Rehabilitation Provision
Overall
RAG
Status
AMBER (some
concerns that need to
be monitored closely) 
Workstream Ambition 
Ring-fenced teams to enable:
• A designated workforce with focus on facilitating discharge without delay and enabling
admission avoidance 
• A robust discharge pathway for those who require home assessment and rehabilitation
following discharge from both front door and downstream wards
• A robust admission avoidance pathway for those not requiring hospital admission but
requiring the benefit of a person centred approach to assessment in their own home setting
• Flexibility to deploy the workforce across the sectors
• Home first conversation to become the norm at every stage of the person’s journey (Why not
home? Why not now?)
• Clear leadership within discharge services
• An approach to avoiding admission to be developed with the IRT and locality teams- Systems
in place to ensure that Home Support, Community IRT and Locality Social Work Teams will be
aware of patients likely to transition to them from HAT at the end of the agreed assessment
period. Agreement in place to ensure HAT transition outwards is not jeapardised.
• Wide-ranging strong links with discharge facilitators within the hospital discharge hub- HAT is
embedded in the Hospital Discharge Hubs and communication, liaison and multi-agency
working in inherent.
• Utilisation of the embedded Planned Date of Discharge (PDD) approach to identify suitable
patients pathways 
• Close working relationship with associated teams: hospital Multi-Disciplinary Teams (MDTs),
District Nursing, Integrated Rehabilitation Teams, Third sector colleagues with access to
satellite equipment stores.
Highlights 
Progress and Achievements:
• Home Assessment Team soft launched in Wishaw in late April 2022 taking referrals from
University Hospital Wishaw and University Hospital Monklands.
• Cumbernauld soft launch in August 2022
• Cumbernauld and Wishaw Home Assessment Teams operating and almost fully staffed.
• As of 3rd April 2023, 561 patients had been referred and discharge supported by the Home
Assessment Team. The growth in the referral rate to the Home Assessment Team has shown a
sustained growth, particularly since the beginning of November 2022. The Hospitals involved
in the referral were UHM 42%, UHW 55%, other 1% and 1% offsite bed.
• During the month of March 2023 HAT had a total of 118 (up 26 referrals from February 2023)
referrals across both sites. Patients were discharged into localities including Wishaw 31 (up 3
from February 2023), Motherwell 38 (up 22 from February 2023, Cumbernauld 26 (up 4 from
February 2023), Airdrie 19 (down 3 from February 2023)
• Workshops held in October to map pathways and review and agree pan-Lanarkshire referral
criteria with all key stakeholders in the MDT including transfers of care into mainstream home
support and rehabilitation services.
• Interface with other teams/staff eg IRT, Locality Social Work, Home Support Teams, GPs

Page 146

7 
• Of the 35.75 FTE Integrated Rehabilitation Team (IRT) posts supported within the Business
Case, 29.5FTE have been recruited to.
Ongoing Actions
• HAT service model in development phase, this will be finalised by end of April 2023. 
• Additional accommodation restructuring ongoing at UHW to ensure teams are co-located
appropriately for next steps. Review by planning team at UHW due to complete end of April
2023 - possibility of new options following same - previous review on hold.
• Recruitment to HAT ongoing to build capacity and roll out across other NL localities (see
appendix 1 for update). The pressures within the system regarding workforce are widely
acknowledged. These pressures have been impacted by the competitive employment market
with staff leaving for better pay and conditions, training and career opportunities. The social
care sector is facing significant challenges, as a regulated workforce, the number of people
leaving to seek alternative careers is at its highest. Additionally, the cost of living and fuel costs
are impacting directly on the workforce
• Virtual Board to be discussed to communicate and act as an early warning system/ barometer
to downstream statutory support services re expected transition from HAT- discussion with
IRT T/Ls, Advanced Practitioners reached agreement re early warning practices and agree no
requirement for virtual board as highlighted in gap analysis
• Discussions re CCA/ increase requests etc and implications for HAT
• Further review of HAT/ Home First pan-Lan criteria to encompass admission avoidance and
plan to develop pan-Lan poster for staff when complete
Future Actions 
• A number of recruitment campaigns have been progressed across health and social care to
recruit across the team including Home Support, Physiotherapy and Occupational Therapy
staff. This is with the intention that the Wishaw and Cumbernauld Team will be fully
operational by end February. Work ongoing to stabilise Airdrie and Cumbernauld localities for
HAT with cross cover
• Moving on to implement HAT in remaining localities, with Coatbridge and Bellshill 
• Communication and engagement activities are progressing including staff briefing sessions,
reaching out to comms department re other comms including animation video
• Review, analysis and recommendations to be undertaken to ensure HAT and home first
approach is intrinsic within the wider HSCP teams and not a stand-alone service
• Establish key links within the Health & Social Care Whole System Dashboard and track wider
impacts of the service on Delayed Discharge performance, and capacity of the home support
service.

Page 147

8 
Workstream Community Nursing Overall
RAG
Status
AMBER (some
concerns that need to
be monitored closely) 
Workstream Ambition
As part of the SCP/ Winter planning work supported by Scottish Government, funding was agreed
to support increased capacity in community nursing teams and to support delivery of the
Community Nursing Review. 
Funding agreed and recruitment progress is highlighted below 
Posts Funded In post
Band 3 HCSW 40 WTE 32.63 WTE
Band 3 admin 8WTE 5WTE
Band 5 RGN 15 WTE 11 WTE
Band 7 ANP 2 WTE 1WTE
Band 7 Practice assessor 2 WTE 2 WTE
Band 8a Senior Nurse 1WTE 1WTE 
There has been turnover in the Band 3 HCSW staff group which has made growth challenging. 
Band 5 recruitment growth has also been challenging due to vacancies within current funded
establishment which is prioritised. 
Progress and Achievements:
• Community Nursing Review Programme Board established with two Short Life Working
Groups set up and running
o Care Management
o Vision and modelling
• Roadshows held
• District Nursing Pathway Evaluation now ready for final comments
• A rolling program for recruitment is being considered and evaluated
• Delays to some actions due to work being carried out on Operation Flow
• Work with Scottish Government in relation to retention, development of workplace and
improving culture 
Future
• Caseload complexity review
• Define the criteria for core and additional caseloads in conjunction with the views of staff.
Consideration will need to be given as to how this fits in with the MORSE system. Although
changes are unlikely to be made before the end of the year/beginning of next year, simple
changes of benefit to staff may be adopted. A couple of roadshows will be scheduled for
further down the line.
• The District Nursing service is aiming for a transformation surrounding how it delivers its
services. There is a shift in the balance of care from acute to primary care and will need to
consider what that will look like and how it can be made ‘fit for purpose’. There is further
emphasis on health promotion and educating families.

Page 148

9 
Workstream Increased Capacity Across Home Support
Service, Equipment and Adaptations
Service, Community Alarms Service &
Assistive Technology
Overall
RAG
Status
AMBER (some
concerns that need to
be monitored closely) 
Workstream Ambition 
The expansion of current direct provision of support will include: 
• Home support expansion, making permanent some temporary measures which are required
longer term to facilitate improved capacity and quality of service. Both frontline practitioners
as well as logistics and operational management posts are included in the immediate
requirements. 
• Increased capacity within the Equipment and Adaptation Service 
• Development of a dedicated Technology Team to support the use of technology within the
HSCP to support individuals within their homes and communities. This team will focus on
embedding technology into assessment and planning processes; providing training to all staff
groups on technology and its use in care and support; supporting with risk assessments;
ensuring technology support advice is embedded in SDS; and providing high level data on the
technology being used within our communities.
Highlights 
Home Support 
 71.89 WTE permanent posts funded by the Business case allocated across localities; process
commencing to match existing temporary staff into these posts within each team.
 New Home Support Delivery Project Board established to progress high level Project Plan, with
Risk Register, Benefits Realisation Plan and Workstreams agreed and being progressed. 
Technology Team and Equipment & Adaptation Service 
 Recruitment to posts complete for the Technology Team and in progress for the Integrated
Equipment & Adaption Service
 Technology team now embedded and links with locality teams being developed.   
Workstream Hospital at Home  Overall
RAG
Status
AMBER (some
concerns that need to
be monitored closely) 
Workstream Ambition 
Extension of Working Hours
 Introduction of Advanced Nurse Practitioners (Band 7) to allow service hours and patient
admission to service to continue until 10pm.
 To allow 2 Band 7 ANPs to be rostered on 7 days a week (one from 8am-6pm, and one from
2pm-10pm) would require 4.58 WTE (including 22.5% planned leave allowance).
 There is a current national shortfall in the availability of qualified Advanced Practitioners,
therefore a training programme would need to be offered and supported, this requires up to
2 years to complete (although some potential internal Hospital @ Home candidates have
already been supported through the advanced clinical care and Non-Medical Prescribing
programmes, so may require less support before becoming fully qualified).
Permanent Funding of Step-Down Pathway
 During the Covid pandemic to assist with anticipated hospital flow and to increase our ability
to serve GPs with hospital admission a “step down” hub was created to ring fence staff and

Page 149

10 
create a designated flow for Acute inpatients to be discharged into the Hospital @ Home
service.
 This service improvement contributed to the increased referral activity and has admitted an
average of 38 patients per month in 2021. Due to the clinical presentation of the patients at
admission to Hospital @ Home the model could be slightly adapted to allow the patients to be
managed by a Junior doctor (with Consultant in-reach when necessary) and band 5 nurses.
Junior doctors have been difficult to recruit on a continuing basis, however an ANP band 7
nurse could provide clinical management to these patients.
Highlights 
• Step down pathway has been operational since May 2020. The permanent funding of this
allowed us to continue this service provision. Since the initial programme we have had some
Band 5 RGNs leave the service for various reasons, some gaining promotion within the service.
This has allowed them to be successful at gaining Band 6 Nurse Practitioner posts within the
service. 
• The Band 5s and Band 4 have been in temporary posts, the permanent funding has allowed us
to appoint on a permanent basis. We have 3 of the 4 Band 5 posts filled permanently with the
third at the recruitment stage, after the previous successful candidate withdrew. The Band 4
is appointed permanently.
• The Band 7 ANP who was appointed withdrew due to personal reasons, the new COR is with
finance for approval to re-advertise.
• The stepdown pathway has supported 390 patients from NHSL Acute wards from April 2022
to Feb 2023 
Workstream Building Capacity of Independent Sector
Providers  
Overall
RAG
Status
AMBER (some
concerns that need to
be monitored closely) 
Workstream Ambition 
It was agreed that a local provider sustainability fund is established to facilitate an individualised
approach to: 
• Supporting recruitment and retention 
• Supporting staff wellbeing 
• Supporting cross sector support to SVQ2 
• Increase to Scottish Care support to the sector 
Highlights 
 Two phases of funding bids have been completed 
 Successful implementation of Interim care home beds programme 
 Successful uptake of financial support in place to support Carers

Page 150

11 
Workstream Investment in Communities    Overall
RAG
Status
AMBER (some
concerns that need to
be monitored closely) 
Workstream Ambition 
To make prevention and early intervention a reality, additional investment is required to add to
the community capacity building work already well embedded in the Community Solutions
Programme through VANL. Further investment through the new Improving Lives workstream will
see development across a number of key priorities for the Partnership, in line with the Strategic
Commissioning Plan, and to ensure there is sufficient capacity within the community and
voluntary sector to respond to demand. 
The range of achievements via the Community Solutions Programme Approach has seen
significant development through anchor organisations of; Support in the Right Direction,
Community Connectors, Improving Cancer Journey and Social Prescribing. Early findings from the
innovation test site introducing 3 conversations to improve First Point of Contact, has indicated
that there is a need to invest more significantly in a robust response through the sector which
would facilitate a further focus on prevention and wellbeing. This will be achieved through
connectedness and valued activity with a combination of paid roles and community investment
funding. 
Funding proposals are based on the appointment of Community Connector posts across key
anchor organisations to support 3 Conversations with Older Adults, Younger Adults and Carers. An
umbrella approach through Community Solutions will ensure a co-ordinated approach throughout
North Lanarkshire and link clearly to the Community Consortia in promoting local opportunities
for and with people, avoiding the need for more formal services for longer. The Community
Connectors will also play an important role in the transitional arrangements for people at the
point they may need more formal responses from the HSCP. 
A core, recurring investment of £1.1m pa supports the Community Solutions programme but an
additional £1.2m over a two-year period would see the considerable expansion of the offer.
Achievements:
• Project to be embedded in the Community Solutions programme and named Improving Lives.
• Project plan finalise and agreed by Chief Officer and Head of Planning, Performance and
Quality Assurance.
• Model for recruitment and deployment of Community Connectors agreed. 
• The current Support in the Right Direction link workers (2wte) have received a 12 month
extension to their funding from SG (to 31 March 2024). This will be of benefit to the new
Community Connectors as these existing staff have established good relationships across NL
and can share learning thought their previous involvement in the 3 Conversation test of
change.
• Opportunity to extend the reach of the Community Connector posts by building in the
Improving Cancer Journey funding. This investment means there will be a total of 10wte posts
(NB this is an increase from the original proposal of 9.5wte).
• Commissioning of locality hosts complete which allows us to recruit to the Community
Connector posts once the ICJ application agreed by Macmillan. 
Activities:
Complete

Page 151

12 
• Project plan agreed.
• Funding for physical activity programmes confirmed for 22/23.
• New part time senior manager recruited to provide capacity to oversee implementation of
Improving Lives programme.
• Six Locality hosts agreed. 
Outstanding
• Finance to be transferred to VANL
• Governance arrangements for test of Individual Support Fund
• Relationship to GP Community Link Workers to be strengthened with the aim of developing
future joint proposals to make best use of available resources where possible. 
• Community Solutions thematic priorities review (first meeting took place 09 Feb) 
Future
• Recruitment of 10 Community Connectors will be progressed once Macmillan agree the ICJ
application (expect approval imminently).

Page 152

13 
Appendix 2
Funding
2022/2023
Projected Costs
2022/2023
Variance
2022/2023
£m £m £m
Recurring Budget 15.750 7.104 8.646
Non-Recurring Budget 1.162 0.448 0.714
Earmarked Reserves 7.712 2.447 5.265
TOTAL FUNDING 24.624 9.999 14.625
APPROVED IN POST VARIANCE
Integrated Rehabilitation Team 49.33 22.02 27.31
Home Assessment Team 138.68 58.08 80.6
Home Support 165.78 125.2 40.58
Infrastructure 18 9 9
Social Work Management 4 3 1
Community Alarms/Stores/Tech 20.2 13 7.2
Community Nursing 69.35 39.71 29.64
Hospital at Home 8.58 3 5.58
TOTAL FTE AS AT PERIOD 12 473.92 273.01 200.91
SUMMARY OF WINTER PLANNING FUNDING AND POSTS
FUNDING DESCRIPTION
OPERATIONAL CATEGORY FTE

Page 153

1 
REPORT 
Item No: 10 
SUBJECT: Fairer Scotland Duty guidance update
TO: Integration Joint Board Performance, Finance & Audit
Lead
Officer for
Report:
Morag Dendy, Head of Planning, Performance and Quality
Assurance
Author(s) of
Report
Kerri Todd, Head of Health Improvement
DATE: 17 May 2023 
1. PURPOSE OF REPORT
This paper is coming to the IJB for: 
For approval ☐ For endorsement ☐ To note ☒ 
The purpose of this report is to update the committee on progress made on
embedding Fairer Scotland Duty requirements into routine business of the HSCP. 
2. ROUTE TO THE BOARD 
This paper has been: 
Prepared By:
Kerri Todd, Head
of Health
Improvement
☒ Reviewed By:
HSCNL Core Management
Team
☒ Endorsed By: ☐

Page 154

2 
3. RECOMMENDATIONS
It is recommended that the IJB Committee: 
(1) acknowledge the amendments that have been made to committee templates
to embed reporting on Fairer Scotland Duty assessments. 
(2) approve the project management approach being taken through the Strategic
Commissioning Plan Programme of Work which will monitor the actions that
arise from the Fairer Scotland Duty assessments.   
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
Background
5.1 The Fairer Scotland Duty (FSD) came into force in Scotland on 1st April 2018
and aims to protect those most affected by poverty in communities. The duty places
a legal responsibility on particular public bodies to actively consider (pay ‘due regard
to’) socio-economic inequalities of outcome when making strategic decisions. 
5.2 The duty is enshrined in Section 1 of the Equality Act 2010 and places a legal
responsibility on particular public bodies, including Integrated Joint Boards, NHS
Boards and Councils. The duty does not override other considerations such as
equality or best value. 
5.3 The 2010 Act specifies that in deciding how to fulfil the duty, organisations must
take into account any guidance issued. The Scottish Government published interim
guidance for public bodies in March 2018 which was refreshed in October 2021 to
incorporate learning from the implementation plan. The implications of the updated
guidance for the FSD were reported to this committee in February 2022. 
5.4 It was agreed that robust governance processes required to be implemented to
assure the Integrated Joint Board that the FSD was being met and review processes
were embedded into the project management of the Programme of Work.
Additionally, professional and operation leads required support to undertake these
assessments. 
Progress
Yes  ☐ No ☒ N/A ☐

Page 155

3 
5.5 Discussions with key personnel in NHSL and NLC have progressed to ensure
that robust processes are in place to meet the requirements of the FSD as well as
equalities mainstreaming. 
5.6 IJB committee papers have been amended to include specific reference to
Equality Impact Assessments and FSD assessments so members can be assured
that the needs of specific populations have been considered and action taken where
required to meet these (see section 7.6). 
5.7 The NHSL integrated equality impact assessment (EQIA) template has been
updated to incorporate the FSD seven key questions to help public bodies determine
how well they have paid ‘due regard to’ their strategic decisions. Recognising the
need to be comprehensive, the template also includes questions to incorporate the
key elements of the Children’s Rights and Wellbeing Impact Assessment tool. Where
assessments indicate it is required, an action plan is developed to address any
inequalities odentified. The NHSL Equalities Lead has implemented a monitoring
process to prompt lead managers to review their action plans and confirm they are
completed.  All EQIAs are saved on the NHSL intranet so they are available for
scrutiny and as examples of good practice.
5.8 NLC has updated its template for committee reports to include reference to the
Public Sector Equality Duty and FSD so all papers must consider if a full assessment
is required and document if this has been undertaken.
5.9 In keeping with these approaches, project management of the Strategic
Commissioning Plan Programme of Work will support monitoring across all elements
of equalities and the FSD, ensuring that robust assessments are undertaken and
action plans are delivered. In line with the requirements from the Equalities and
Human Rights Commission, EQIAs will be added to the HSCNL website
(https://hscnl.org.uk/about-us/). 
5.10 To build capacity across professional and operational leads to implement
EQIAs and FSD assessments, Scottish Government Covid Recovery funding was
secured to create a 2 year, fixed term post to provide training and support for
managers. The postholder advises staff undertaking EQIAs and supports them to
access local datasets to aid decision making. 
6. CONCLUSIONS
6.1 Significant progress has been made to embed robust processes that ensure the
requirements of the FSD (alongside EQIAs) are in place.
6.2 The Programme of Work to implement the Strategic Commissioning Plan will
take a project management approach that will support these processes and monitor
any actions that arise from FSD (or EQIA) assessments.

Page 156

4 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☐
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☐
Health and Social Care Services contribute to reducing health inequalities  ☒
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☐
7.2 ASSOCIATED MEASURE(S)
None 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Choose an item. 
7.5  PEOPLE
Yes  ☐ No ☐ N/A ☒

Page 157

5 
Where required, professional and operational leads are supported to implement the
FSD guidance and complete EQIAs for their services. This ensures that services are
as inclusive as possible and consider the specific needs of people who experience
poorer outcomes. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
EQIA added to website: 
8. BACKGROUND PAPERS
Fairer Scotland Duty – Guidance for Public Bodies
https://www.gov.scot/publications/fairer-scotland-duty-guidance-public-bodies/   
9. APPENDICES
Please include a glossary of terms if not already included. 
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please contact
the following; 
Kerri Todd, Head of Health Improvement, kerri.todd@lanarkshire.scot.nhs.uk
Yes  ☐ No ☐ N/A ☒
Yes  ☐ No ☐ N/A ☒

Page 158

6

Page 159

7 
Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed

Page 160

8

Page 161

1 
REPORT 
Item No: 11 
SUBJECT: Implementation of the National Trauma Framework for North
Lanarkshire
TO: Integrated Joint Board
Lead
Officer for
Report:
Alison Gordon, Chief Social Work Officer (Children, Families,
Justice and Integrated Practice)
Author(s)
of Report 
Margaret Flavell, Senior Manager Adult Social Work Services
DATE: 17 May 2023 
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
For approval ☐ For endorsement ☒ To note ☐ 
2. ROUTE TO THE BOARD
This paper has been:
Prepared
By:
☐ Reviewed
By:
☐ Endorsed By: ☐ 
3. RECOMMENDATIONS
IJB Committee:
(1) Endorse the approach to the implementation of Trauma Informed Practice
across the Health and Social Care Partnership as set out in this report.
(2) Agree that the workforce should be trained at the ‘informed level’ as part of the
suite of mandatory training.
(3) Consider IJB members and/or Health Board members being a Trauma
Informed Champion

Page 162

2 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1 Summary 
5.1.1 The Transforming Psychological Trauma: Knowledge and Skills Framework (The
Framework) has been developed by NHS Education Scotland (NES) to support the
delivery of Scottish Government and COSLA’s joint policy intention to create a trauma-
informed workforce.   
5.1.2 Being trauma-informed is about long-term culture and system change across the
Health and Social Care Partnership (HSCP) and the Council to create the conditions
in which staff feel supported to care for and respond to citizens in ways that recognise
the impacts of trauma and create relationships that heal and resist re-traumatisation. 
It will support the delivery of the ambitions of the Strategic Commissioning Plan and
changes within the Council’s new Programme of Work. 
5.1.3 The purpose of this paper is to set out for the Integrated Joint Board the actions being
taken to embed the Framework in North Lanarkshire, highlight areas of practice where
a trauma informed approach is already making a positive difference for children and
individuals and outlining next steps, in ensuring North Lanarkshire becomes a leading
trauma informed HSCP and council. 
5.2 Background 
5.2.1 Evidence of the full impact of trauma, particularly adverse childhood
experiences (ACES) has been emerging now for some time, establishing
beyond doubt that its effects can be wide-ranging, substantial, long-lasting, and
costly (NHS Education for Scotland, 2021). In response to this Scottish
Government established a National Trauma Training Programme, led by NHS
Education for Scotland (NES) to support the ambition, agreed with COSLA, to
create trauma-informed and trauma-responsive workforce and services across
Scotland.  
5.2.2 In 2019 the Scottish Government published the Scottish Psychological Trauma
Training Plan (Trauma Training Plan) to support the local implementation of
Transforming Psychological Trauma: Knowledge and Skills framework for the
Scottish Workforce (The Trauma Framework). Working with COSLA, the
commitment to the implementation of The Trauma Framework was reiterated in
the Programme for Government 2021-22 along with the initiation of a
Leadership Pledge of Support for Trauma Informed Practice to raise the
standard of support across public and third sector organisations.  COSLA and
several local authorities and HSPCs have signed this pledge, including North
Lanarkshire HSCP. See Leadership Pledge Signatories. 
Yes  ☐ No ☒ N/A ☐

Page 163

3 
5.2.3 The Trauma Framework outlines the importance of creating a trauma-informed
system and organisation that supports the workforce engage with citizens in a
trauma-informed way.   This is reflected in 5-key drivers for trauma-informed
practice which emphasise the importance of leadership and the wellbeing of the
workforce: 
1. Leadership and management
2. Workforce wellbeing 
3. Workforce knowledge and skills 
4. Experts by experience
5. Data and feedback loops  
5.2.4 Being ‘Trauma Informed’, both at the practitioner and organisational level
means being able to recognise when someone may be affected by trauma,
taking this into account, and responding in a way that supports recovery, does
no harm, and recognises and supports people's resilience.  To achieve this, a
trauma informed approach comprises 5 key principles:  Safety, Trust, Choice,
Empowerment, and Collaboration (see Appendix A). 
5.2.5 The Trauma Training Plan, developed by NES, tailors training to the type of role
and function performed by staff across 4 practice levels: trauma informed;
trauma skilled; trauma enhanced, and trauma specialist (see Appendix B). 
5.2.6 Being trauma-informed as an organisation has significant benefits for staff and
the people they serve.  Services are organised in ways that promote safety and
trust to prevent re-traumatisation, and this is effective in preventing concerns
and difficulties escalate, which in turn have a human and economic cost. The
approach is about addressing inequality by ensuring that those affected by
trauma (staff or those they serve) do not experience barriers to life chances and
choice as a result of trauma and that trauma is recognised and responded to in
order to support recovery.  Becoming a trauma-informed organisation is not
simply about doing what we already do better, rather it is transformative in the
way services are organised and delivery and therefore requires to be key part
of the delivery of the ambitions of the Strategic Commissioning Plan. 
5.3 Report 
5.3.1 Scottish Government and COSLA asked all local authorities and health boards
to appoint trauma champions to ‘oversee, encourage and raise awareness of
trauma informed and trauma responsive practice across all services within their
area’.  The champions have a specific responsibility to influence local leaders
to embed the five key drivers of trauma-informed practice (as detailed in 1.3)
across their area. 
5.3.2 The North HSCP nominated Margaret Flavell, Senior Manager Adult Social
Work as the champion.  As requested by COSLA and Scottish Government,
Ministers have been advised of this, who are working with national leads in
Scottish Government and the Improvement Service, as well as local leads in
NHS Lanarkshire in relation to implementation.

Page 164

4 
5.3.3 Two steering groups have been established, one that is Pan Lanarkshire and a
north operations group of staff from the HSCP and North Lanarkshire officers
from Education and Families, Enterprise and Communities, People Resources
with the purpose of providing strategic direction and coordination of support and
training to promote the implementation of Trauma-Informed Practice. The
Scottish Government has made £100K available to all local authorities over two
years to support the implementation of Trauma-Informed Practice.  An officer
was therefore appointed in January 2023, to lead on the implementation of
Trauma Informed Practice and build on, and add pace to, the work started to
integrate the Trauma Training Programme with current training plans in place
to deliver The Plan for North Lanarkshire. Additionally there are 2 Health and
Wellbeing officers being employed for the HSCP to support staff wellbeing that
will be aligned with the outlined Trauma Informed Practice approach. 
5.4 Trauma Informed Practice across the HSCP 
5.4.1 The importance of being trauma-informed in our approach to support citizens
has been recognised by services across the partnership. The Strategic
Commissioning Plan, is underpinned by the strategy to develop a trauma skilled
work force, building on established work around nurture, resilience and other
approaches based on forming strong relationships with children and families.  
Awareness about the importance of trauma recovery has been integrated into
the delivery of nurture and resilience work and critical incidents; this is evident
in Adult Protection practice. 
5.4.2 The importance of being trauma-informed also underpins the Partnership’s
longstanding investment in prevention and early intervention work with our
existing workforce and our third sector partners with its principles incorporated
within the multiagency adult protection training, domestic abuse training and
others although this requires further development.  
5.4.3 The housing service is working to embed trauma-informed understanding of
working with people through its implementation of the Solihull approach across
the service.  Other initiatives such as psychologically informed environments,
‘Family Plus’ and ‘Forever Homes’ have been piloted with housing and partners
recognising the importance of trauma-informed approaches on improving
outcomes. The Local Housing Strategy (2021-2026) and the Rapid Rehousing
Transition Plan also set out how a trauma-informed workforce will improve
outcomes for people in need of support with housing.  Work is also underway
to help identify the barriers and enablers for adopting a trauma-informed
approach within housing to inform the actions and support required to embed
trauma-informed practice in housing practice. 
5.4.4 An awareness of the impact of trauma is now also embedded into the approach
to the design and development of North Lanarkshire’s community hub
programme.  Working with the Promise Development team and Council
equalities officer we applied a ‘trauma lens’ using the Scottish Government
toolkit and identified a number of improvement actions e.g. paint colours,
signage, seating, layouts and signposting to supports and services. This work
will continue as our new community hubs are introduced and through tests of

Page 165

5 
change to address the barriers that those affected by trauma can experience
while accessing supports and services. This work will be further developed
through existing workplaces across the partnership by teams applying a ‘trauma
lens’ to their working environments. 
5.4.5 The Council’s Equalities Delivery Board also has Trauma Informed Practice
firmly sitting within its strategy, delivery framework and five objectives to ‘ensure
that local public services are responsive to different needs and treat users with
dignity and respect’. 
5.5 Training 
5.5.1 The North steering group is developing a strategy to use the national Trauma
Training Plan to support implementation across the HSCP and North
Lanarkshire.  An e-learning module at the ‘informed level’ (see Appendix B) is
in development for all staff in the Council and committee is asked to approve its
inclusion within the mandatory suite of training for Council employees. The
Health Board is asked to consider this also for NHSL staff.  Beyond this, an
assessment tool is being developed for services to identify at what level groups
staff need training across the continuum of informed to specialist and training
plans will be built around analysis of need, integrating trauma informed practice
wherever possible. A specific training offer for education staff has been
developed in collaboration with Education Scotland to enhance understanding
of trauma responsive strategies, aligned with the outcomes within the Roadmap
to Recovery. 
5.5.2 Dr Claire Stark, Lanarkshire Trauma Coordinator, has delivered introductory
sessions to 100 plus first line managers across the partnership. There are
further planned sessions by Dr Claire Stewart, Lanarkshire Trauma Coordinator
to the Strategic Leadership Team to increase leadership understanding, refresh
engagement and to agree next steps. Additionally, Dr Claire Stewart has
delivered an introduction to The Trauma Framework to the NL Council
Corporate Management Team and elected members, which is now available to
members digitally.    
5.5.3 The principles of being trauma informed underpin and support all work with
children, families, and adults.  As such, the steering group has coordinated a
review of training delivered to social work practitioners, housing staff, within
Education and across public protection to identify where the principles of trauma
informed practice are embedded in training already. Training packages have
been updated to reflect these principles where required. This is required across
health staff training and the HSCP Organisational Development lead officer will
support this. 
5.6 Next Steps 
5.6.1 There has been a lot of activity to raise awareness about trauma-informed
practice to lay the foundations for a trauma informed workforce through training. 
However, the success of such initiatives will be limited without clear and
unambiguous strategic and organisational support for the approach, which

Page 166

6 
ensures it ties in with the vision and ambition of the Strategic Commissioning
Plan (SCP) and the Plan for North Lanarkshire.  We are at the beginning of this
process that moves from an organisation that is trauma aware to one that is
trauma informed as set out in Appendix C. Particular attention needs to be given
to ensuring that we understand the impact and how outcomes for people are
being improved through the development of a trauma informed workforce. 
5.6.2 Embedding sustainable trauma-informed ways of working is about long-term
culture change. The steering group has identified key priorities below linked to
the 5 strategic drivers for a Trauma Informed organisation outlined in 1.3: 
 Leadership: Appoint an elected member as Trauma Champion to
support the work of the steering group develop plans for North
Lanarkshire becoming a trauma-informed Council to support the
fulfilment of the ambition of the Plan for North Lanarkshire and the new
Programme of work. Health Board members would assist this also.
Likewise further SLT to support the SCP ambitions and embed trauma
informed practice across the partnership.  Re-fresh governance and
membership of the of steering group. 
 Workforce Wellbeing: The actions to deliver the NHSL and Council’s
Mental Health Strategy for staff are underpinned by the 5 principles of a
trauma-informed organisation. 
 Workforce knowledge and skills: Each service across the partnership
should assess the level at which staff need training and a base line is
established in order to update the training strategy for trauma informed
practice. 
 Experts by experience: Individuals, families and communities drive our
approach to becoming a trauma informed organisation using existing
structures for participation and engagement. 
 Data and Feedback Loops: Base lines and outcome data for trauma
informed practice are integrated and aligned with measures of success
within the SCP and the Council’s new Programme of Work. 
5.7 Leadership Pledge
5.7.1 As set out in the Programme for Government 2021, a Leadership Pledge of
Support has been introduced for organisations to demonstrate their
commitment to supporting and embedding a trauma informed culture across
their workforce and services. Signatories to this pledge agree to: 
• Work with others to put trauma-informed and responsive practice in place
across our workforce and services. 
• Deliver services that wherever possible are actively informed by people with
lived experience of trauma.

Page 167

7 
• Recognise the central importance of relationships that offer collaboration,
choice, empowerment, safety, and trust as part of a trauma-informed
approach. 
• Respond in ways that prevent further harm, and that reduce barriers so that
people affected by trauma have equal access to the services they need,
when they need it, to support their own journey of recovery. 
5.7.2 The IJB are asked to endorse the HSCPs Pledge as a commitment to becoming
trauma informed as a way of working and approach in everything it does and
its importance for the delivery of high-quality services and support to people in
North Lanarkshire.     
6. CONCLUSIONS
6.1 The IJB is asked to endorse and promote the implementation of Trauma
Improved Practice across the HSCP workforce and subsequently service
delivery to our NL citizens. 
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and
wellbeing and live in good health for longer 
☐
People, including those with disabilities or long-term conditions, or
who are frail, are able to live, as far as reasonable practicable,
independently and at home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☒
Health and Social Care Services contribute to reducing health
inequalities 
☐
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged
with the work they do and are supported to continuously improve the
information, support, care and treatment they provide
☒
Resources are used effectively and efficiently in the provision of
Health and Social Care Services 
☐
7.2 ASSOCIATED MEASURE(S)
7.2.1 Staff are trained in Trauma Informed Practice at the level commensurate with
their role. 
7.2.2 Improvement action on trauma design of spaces are delivered in line with the
implementation of town and community hubs with ongoing learning feeding into
future design.

Page 168

8 
7.2.3 Staff engagement, retention and wellbeing is improved through the
implementation of trauma informed work at a systems level. 
7.2.4 HSCP, Council staff, partners, services, and environments recognise the
prevalence and impact of trauma, how they may create barriers to support, the
key role they play in people’s recovery, and how they can reduce the possibility
of re-traumatisation. 
7.2.5 Outcomes for children, young people and adults are improved through positive
relationships with staff and evidenced in feedback from citizens on their
experiences. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
7.3.1 Cost of the Trauma Informed Practice implementation post (NLC 12) at mid-
point including on costs is £58,381.  Post is funded from approved carry forward
and 2022-23 funding from Scottish Government.
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register Details  Current Risk Level  Risk Owner 
There are risks to children, individuals and
families of re-traumatisation and increased
distress if staff are insufficiently trauma-
informed in their approach and practice.
The roll out of The Training Plan is a
national policy priority and the extent to
which services have integrated and applied
the approach will be subject to external
scrutiny, particularly in any joint strategic
inspection of children’s or adult services.  If
our workforce do not recognise trauma as
an important factor impacting health
throughout a person’s life, there is a risk that
we do not enhance the positive impact we
are seeking to achieve against our citizens
health and wellbeing outcomes. 
If our physical spaces are not designed and
maintained to offer a sense of safety,
calmness, dignity, and promoting choice
and control it could significantly impact the
positive impact and aspiration we have for
our town and community hubs. This also
Choose an item. Margaret
Flavell
(HSCP)
Yes  ☒ No ☐ N/A ☐

Page 169

9 
extends to an impact on productivity of staff
and our ability to provide supports and
services that are inclusive and responsive
in their delivery.  The trauma roadmap
applied to our operating model for town and
community hubs will address this risk
through the improvement action. 
Attention to the principles of Trauma
Informed Practice has now been
incorporated into the revised Strategic
Policy Framework adopted by the Policy
and Strategy Committee on 16 March 2023.
Furthermore, Trauma Informed Practice
now firmly sits within the objectives of the
Council’s Equalities Delivery Board. 
The steering group is creating a project risk
register in line with the development of the
implementation plan as outlined in 2.11
which will identify the baseline risk level. 
7.5  PEOPLE
7.5.1 Trauma Informed Practice features as a firm commitment within the strategy, delivery
framework and objectives of the Equalities Delivery Board. In terms of trauma design
of town and community hubs and their spaces, the Council’s Safety and
Wellbeing team and Equalities officer are involved in plans and improvement
actions. 
7.5.2 The TOD team are engaged in training roll out proposals contained in this report
and as HR policies are reviewed the impacts of trauma will be considered in
development of guidance and toolkits to promote the wellbeing of staff.  It is
important to note that many staff may have experienced trauma themselves,
and some research suggests that those in human services have a higher
prevalence of adverse experiences, which means that staff support and
strategies to mitigate secondary traumatic stress are crucial (Scottish
Government, 2021).
7.5.3 There will be some impact around communication and engagement with
communities and with staff if the report is approved.  Particular emphasis will
need to be given to engagement and communication around the training roll
out.  In terms of physical design of spaces, environment, and buildings there
may be requirements to replace signage and other communications material. 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report:

Page 170

10 
EQIA added to website: 
7.6.1 There is a growing body of evidence that impact of adverse childhood
experiences and trauma contribute to increased risk of a wide range of physical
and mental health conditions and social problems, including involvement in the
justice system (Scottish Government, 2018).  A trauma-informed approach to
the delivery of services mitigates these risks and is an important component in
the strategic work to reduce inequalities and delivering priorities within the 
HSCPs Strategic Commissioning Plan and the Council’s new Programme of
Work.
8. BACKGROUND PAPERS  
None.
9. APPENDICES
Please include a glossary of terms if not already included. 
9.1 Appendix A Trauma-Informed System
9.2 Appendix B Trauma Training Plan
9.3 Appendix C Trauma Informed Roadmap 2023-25
9.4 Appendix D The Scottish Psychological Trauma Training Plan 
trauma-training-plan-final.pdf (transformingpsychologicaltrauma.scot) 
CHIEF ACCOUNTABLE OFFICER 
Members seeking further information about any aspect of this report, please
contact the following; Margaret Flavell, Senior Manager Adult Social Work
Services 
Yes  ☒ No ☐ N/A ☐
Yes  ☐ No ☒ N/A ☐

Page 171

11 
Direction from North Lanarkshire Integration Joint Board
(IJB) 
1 Reference Number  
2 Report Title  
3 Date direction issued by
IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke
a previous direction – if
yes, include reference
number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance arrangements 
11 Date direction will be
reviewed

Page 172

12 
Appendix A:  Trauma-Informed System

Page 173

13 
Appendix B:  Trauma Training Plan

Page 174

14 
Appendix C:  Trauma Informed Roadmap 2023-25

Page 175

1
REPORT
Item No: 12
SUBJECT: Our Health Together 
TO: IJB
Lead
Officer for
Report:
Ross McGuffie, Chief Officer North HSCP
Author(s)
of Report 
Stacey Anderson, Support Services, Project Manager 
DATE: 17 May 2023
1. PURPOSE OF REPORT
This paper is coming to the IJB for:
For approval ☐ For endorsement ☐ To note ☒
2. ROUTE TO THE BOARD
This paper has been:
Prepared By: ☐ Reviewed By:
The Planning,
Performance
and
Resource
Committee 
☒ Endorsed By: ☐

Page 176

2 
3. RECOMMENDATIONS
It is recommended that the IJB note the content of the report. 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1  Our Health Together - Living Our Best Lives in Lanarkshire 
5.1.1 The engagement to inform NHS Lanarkshire’s new healthcare strategy ‘Our
Health Together’ launched on 21st April and gives our communities and those
who work in the service the chance to shape how we deliver healthcare for
future generations. 
5.1.2 The aim is to deliver a wide-ranging stakeholder engagement programme
involving patients, unpaid carers, our staff and local communities (including
children and young people), working together to inform the development of our
new strategy ‘Our Health Together – Living Our Best Lives in Lanarkshire’.    
5.1.3 Now is the time for everyone in Lanarkshire, residents and staff, to play a major
role in shaping services for the future and to be involved in discussions about:
 Factors that affect people’s health and wellbeing;
 Ways in which NHS Lanarkshire can support local people to stay well;
 Access to NHS Lanarkshire services 
 The role of digital developments in healthcare. 
5.1.4 Advances in medicines, technology and science provide opportunities to change
and modernise the way we deliver care.  There are also challenges that we
need to plan for now. To help treat and support those who need healthcare the
most we need to maximise what we can provide within our resource.  Local
residents and staff need to play a vital role in shaping services that deliver
modern healthcare.   
5.1.5 In February the NHS Lanarkshire Planning, Performance and Resource
Committee signed off the Our Health Together (OHT) Public Engagement Pack,
with approval to finalise and move to engagement thereafter.  Since February
a number of actions have been completed by the Our Health Together team as
Yes  ☐ No ☒ N/A ☐

Page 177

3 
detailed below which has resulted in the formal of Stakeholder Engagement
Programme which took place on Friday 21st April 2023. 
5.2 Our Health Together Development Actions Feb- April 2023. 
5.2.1 Communications
 Communication plan finalised (Appendix 1 OHT Engagement Plan)
 OHT web page developed 
 Animation Video and BSL video produced detailing the purpose of the
engagement
 Social media and media campaign agreed 
5.2.2 Documentation and Resources
 Review and update of the engagement briefing concluded ensuring
compliance with plain English guidelines
 Graphics incorporated to make the document more engaging and
accessible
 Development of an “in-brief” version 
 Development of an “easy-read” version of the briefing 
 Demographic questions incorporated
 Presentation developed
 Facilitators pack developed 
 Staff engagement questions consulted on and finalised based on agreed
themes and the community engagement plan  
 Questionnaire (staff and community) build completed on Smart Survey
platform 
5.2.3 Pre Engagement Testing
 Consultation and testing of the briefing pack and community engagement
questions
 Successful pre-engagement event with the NL Community Board
undertaken to test the approach 
5.2.4 Review and Evaluation
 Engagement with Healthcare Improvement Scotland – Community
Engagement Directorate who have reviewed and fed back positively on
the approach we are adopting 
 Development of an Evaluation process which will allow us to review and
adjust our approach as we progress
 Mid engagement review process agreed to review reach and feedback to
date based on collated demographics
 Evaluation timeline agreed (quantitative evaluation to be concluded early
July)

Page 178

4
5.3 The next steps.
5.3.1 Work will continue to: 
 review feedback to further refine the Engagement Programme Plan
(Appendix 1); and
 review staff and community responses to determine if additional
targeted communications are required.
6. CONCLUSIONS
6.1  The IJB is asked to note the ongoing development and refinement of the
Stakeholder Engagement programme to inform the development of our new
Our Health Together strategy. 
The OHT Development Timeline is detailed below for information. 
7. IMPLICATIONS
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer 
☒
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☒
Health and Social Care Services are centred on helping to maintain or
improve the quality of life of people who use those services 
☐

Page 179

5 
Health and Social Care Services contribute to reducing health inequalities  ☐
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services 
☒
7.2 ASSOCIATED MEASURE(S)
Progress against implementation of the final strategy will be monitored via NHS
Lanarkshire’s Planning, Performance and Resources Committee. 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details 
Current Risk Level  Risk Owner 
Corporate Risk 2062 Choose an item. Strategy Delivery Team 
7.5  ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken.
Objectives  Further Details 
☒ Involve stakeholders in the development
work aimed at achieving the national 
outcomes 
☒ Provide stakeholders with information on
how to get involved 
☒ Ensure a diverse range of engagement
and participation and opportunities are in 
place to suit different needs 
☒ Measure how well we involve community
stakeholders in the planning, design 
Yes  ☐ No ☐ N/A ☒

Page 180

6 
and delivery of our services 
☒ Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery 
☒ Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings 
☒ Develop participation guidelines to
ensure a common understanding and set of 
expectations for both stakeholders and
partnership staff 
☒ Support engagement planning and
participation in localities, taking account of 
other engagement activity and local plans
across the Community Planning 
Partnership 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
An EQIA on the communications and engagement process has been completed, with
EQIAs developed/being developed for individual work stream engagement. 
EQIA added to website: 
8. BACKGROUND PAPERS   
Yes  ☒ No ☐ N/A ☐
Yes /
Date
added 
☐ No ☐ N/A ☐

Page 181

7
9. APPENDICES
Appendix 1 – Engagement Programme Plan 
CHIEF ACCOUNTABLE OFFICER (or Depute)  
Members seeking further information about any aspect of this report, please contact
Ross McGuffie on telephone number 01698 752 591.

Page 182

8
Direction from North Lanarkshire Integration Joint Board (IJB)
1 Reference Number
2 Report Title
3 Date direction issued by IJB
4 Date from which direction
takes effect
5 Direction to:
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s)
7 Functions covered by
direction
8 Full text of direction
9 Budget allocated by
Integration Joint Board to
carry out direction
10 Performance Management /
Governance arrangements
11 Date direction will be
reviewed

Page 183

NHS LANARKSHIRE OUR HEALTH TOGETHER
Engagement Plan
Updated 18.4.23
DATE ACTIVITY DETAILS WORKSTREAMS/THEMES STAKEHOLDERS STATUS
Jul-Sep '23 Development of Equality Impact Assessment
on the engagement process
EQIA developed to inform final engagement plan and support an
inclusive approach to the process
Our Health Together Public, staff Complete
Aug-Sep '22 Staff briefing, The Pulse Sustainability and Climate Change Strategy survey Sustainability Staff Complete
6.9.22 NHS Lanarkshire Public Reference Forum Update on Our Health Together and discussion to inform engagement
plan
Our Health Together Public Complete
Sep '22 Online survey Public and staff survey to inform development of digital strategy Digital Public, staff Complete
Sep '22 Online survey Public and staff survey to inform development of quality strategy Quality Public, staff Complete
26.19.22 Cluster Quality Leads Update with GPs in Lanarkshire Our Health Together Staff Complete
28.9.22 Planning, Policy and Resources Committee
Meeting
Our Health Together framework and draft engagement plan Our Health Together NHS Lanarkshire Board Complete
30.11.22 Planning, Policy and Resources Committee
Meeting
Update report Our Health Together NHS Lanarkshire Board Complete
25.1.23 NHSL Board Meeting Update report Our Health Together NHS Lanarkshire Board Planned
7.2.23 NHS Lanarkshire Public Reference Forum Update on Our Health Together and discussion to inform engagement
plan
Our Health Together Public Complete
22.2.23 Planning, Policy and Resources Committee
Meeting / NHSL Board Meeting
Board sign-off of framework and engagement document Our Health Together NHS Lanarkshire Board Complete
23.3.23 Our Health Together - Future Engagement
with Community Boards
MS Teams engagement meeting including presentation and breakout
group discussion
Our Health Together Members of North Lanarkshire Community Boards Complete
29.3.23 Lanarkshire Rehabilitation Strategy Steering
Group
MS Teams meeting including presentation and questions. Calvin
attending.
Our Health Together Staff, public, third sector and partners Complete
14.4.23 Area Medical Advisory Committee MS Teams meeting including presentation and questions. Calvin
attending. Meeting postponed as not quorate.
Our Health Together Staff Complete
21.4.23 Launch of Our Health Together community
and staff engagement programme
Engagement period runs from 17 April to 23 June 2023. Details of
specific communications and engagement activity below.
Our Health Together All Planned
21.4.23 Our Health Together public webpages New Our Health Together web section on NHSL public website
https://www.nhslanarkshire.scot.nhs.uk/our-health-together/ including:
engagement document; in brief engagement document; video; BSL
video; EQIAs - comms/engagement; survey links;
details of engagement events; email inbox:
ourhealthtogether@lanarkshire.scot.nhs.uk
Our Health Together All In progress
21.4.23 Full engagement document Distributed electronically to stakeholders and available on the website.
Printed copies available on request.
Our Health Together All In progress
21.4.23 In brief engagement document Distributed electronically to stakeholders and available on the website.
Printed copies available on request.
Our Health Together All In progress
Appendix 1

Page 184

DATE ACTIVITY DETAILS WORKSTREAMS/THEMES STAKEHOLDERS STATUS
21.4.23 Easy read (assessible) engagement
document
Easy read version of document for people with learning disabilities Our Health Together All In progress
21.4.23 Online surveys Online stakeholder surveys developed and delivered with support from
Snook. Separate surveys for public and staff stakeholders.
Our Health Together All In progress
21.4.23 Paper survey Paper alterative for those unable to access online survey Our Health Together All In progress
21.4.23 Engagement feedback email address Our Health Together email address for stakeholder feedback and
questions: ourhealthtogether@lanarkshire.scot.nhs.uk
Our Health Together All In progress
21.4.23 Stakeholder electronic newsletters Reguar newsletters issued to stakeholders during the engagement
process up to launch of the final strategy including: link to video; link to
survey; link to documents
Our Health Together All In progress
21.4.23 Media release on launch of engagement Engagement launch media release followed by reguar media releases
issued to stakeholders during the engagement process up to launch of
the final strategy
Our Health Together All In progress
21.4.23 Engagement video Overview engagement video for use on website social media Our Health Together All In progress
21.4.23 Engagement BSL video British Sign Language engagement video for use on website and social
media
Our Health Together All In progress
21.4.23 Social media posts Regular social media posts to inform, update and encourage
stakeholder participation
Our Health Together All In progress
21.4.23 Flyers A5 flyer for use at in person engagement opportunities to encourage
update of engagement survey
Our Health Together All In progress
21.4.23 Posters Our Health Together All In progress
21.4.23 Pulse article on launch of engagement Engagement launch media release followed by reguar articles during
the engagement process
Our Health Together Staff and GPs In progress
21.4.23 All in Lanarkshire staff email on launch of
engagement
Engagement launch email to all NHS Lanarkshire staff and GPs Our Health Together Staff and GPs In progress
TBC NHS Lanarkshire Ethnic Minority Employee
Network Newsletter
Article in newsletter on Our Health Together Our Health Together Staff In progress
21.4.23 Weekly email staff briefing Item on engagement launch followed by regular reminders during the
engagement process
Our Health Together Staff and GPs In progress
24.4.23 Disabillity Network MS Teams meeting including presentation and questions. Calvin
attending.
Our Health Together Staff Planned
24.4.23 GP Sub Committee MS Teams meeting including presentation and questions Our Health Together GPs Planned
26.4.23 Planning, Policy and Resources Committee
Meeting
Update report Our Health Together NHS Lanarkshire Board Planned
27.4.23 Area Clinical Forum 2pm - Presentation and feedback discussion with ACF Our Health Together Area Clinical Forum, staff and GPs Planned
4.5.23 Acute Site Medical Staff Association - UHM MS Teams meeting including presentation and questions Our Health Together Staff Planned
2.5.23 Public Reference Forum MS Teams meeting including presentation and questions. Single item
agenda to focus on OHT discussion. Calvin attending.
Our Health Together Staff and Public Planned

Page 185

DATE ACTIVITY DETAILS WORKSTREAMS/THEMES STAKEHOLDERS STATUS
10.5.23 In person - staff engagement roadshows Staff engagement roadshow at University Hospital Hairmyres Lecture
Theatre (10-11am) All staff from NHS Lanarkshire and health and
social care partnerships invited.
Our Health Together Staff Planned
12.5.23 Mid-engagement review meeting Meeting of NHS Lanarkshire Communications and Engagement
Strategy Delivery Goup (with stakeholder involvement) to review
progress with engagement process
Our Health Together All Planned
16.5.23 In person - staff engagement roadshows Staff engagement roadshow at University Hospital Wishaw Ronald
Miller Lecture Theatre (10-11am) All staff from NHS Lanarkshire and
health and social care partnerships invited.
Our Health Together Staff Planned
22.5.23 snook
23.5.23 Area Partnership Forum 9.30am - Presentation and feedback discussion with APF Our Health Together Area Partnership Forum Planned
24.5.23 In person - staff engagement roadshows Staff engagement roadshow at University Hospital Monklands Lecture
Theatre (10-11am) All staff from NHS Lanarkshire and health and
social care partnerships invited.
Our Health Together Staff Planned
9.6.23 Elected represenative briefing session MS Teams elected representative engagement session open to
Lanarkshire MSPs, MPs and councillors. Presentation by Colin and
Chris
Our Health Together MSPs, MPs, councillors Planned
21.6.22 AHP Area Advisory Committee MS Teams meeting including presentation and questions Our Health Together Staff Planned
Apr-Jun  '23 Online community engagement events MS Teams meetings including presentation, questions and group
discussion. Invite to be open to all stakeholders. One daytime and one
evening session planned. Details to be confirmed
Our Health Together All Planned
Apr-Jun  '23 Engagement outreach Face-to-face engagement opportunities to raise awareness of
engagement, encourage completion of survey and answer questions.
Locations to include hospitals, health centres, vaccination clinics
Our Health Together All Planned
Apr-Jun  '23 Health Improvement engagement
opportunities
Health Improvement Team to undertake engagement with relevant
groups and make use of exisiting interactions with services users to
raise awareness of the engagement process and encourage completion
of the survey
Our Health Together All Planned
Apr-Jun  '23 Engagement presentation to community
groups
Opportunity for local groups to request engagement presentation at
their meeting
Our Health Together Community stakeholders Planned
Apr-Jun  '23 Online staff engagement event Two online staff engagement events - one aimed at North Lanarkshire
and one at South Lanarkshire health and social care partnerships staff.
Our Health Together Staff Planned
Apr-Jun  '23 Voluntary Action South Lanarkshire
(VASLAN) locality network engagement
events
Two engagement sessions (one rural, one urban)  with the VASLAN
localtiy networks. Details to be confirmed.
Our Health Together Voluntary Action South Lanarkshire Planned
Apr-Jun  '23 Voluntary Action North Lanarkshire (VANL)
locality engagement events
Engagement sessions with VANL localities. Details to be confirmed. Our Health Together Voluntary Action South Lanarkshire Planned
23.6.23 Close of Our Health Together community and
staff engagement programme
Closing date for official engagement period and survey. Our Health Together All Planned
Sep '23 Stakeholder review of draft strategy Post engagement stakeholder meeting to review how feedback has
informed the draft strategy document
Our Health Together All Planned