Democracy Spraffa

Item 15 - Net Zero

North Lanarkshire Council · 30 November 2022
Back to Health and Social Care Integration Joint Board — 30 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

REPORT 
Item No: 15 
SUBJECT: Climate Change reporting
TO: Integration Joint Board 
Lead
Officer for
Report:
Morag Dendy, Head of Planning, Performance & Quality Assurance 
Author(s)
of Report
Graeme Cowan, Senior Manager, Strategy & Performance 
DATE: 30th November 2022 
1. PURPOSE OF REPORT 
This paper is coming to the IJB for:
The purpose of this report is to provide a summary to the Integration Joint Board (IJB)
on Climate Change reporting requirements and seek approval for submission of the
annual Climate Change report to the Scottish Government.
The IJB is also asked to note correspondence from Michael Mathieson, Cabinet
Secretary for Net Zero, Energy and Transport, highlighting a strengthening in Climate
Change reporting requirements for public bodies. 
For approval   For endorsement  To note 
2. ROUTE TO THE BOARD 
Prepared    Reviewed   Endorsed   
This paper has been: prepared by the Planning and Performance Team and
endorsed by senior management.

Page 2

3. RECOMMENDATIONS 
3.1 The IJB is asked to agree the contents of the Climate Change report prior to its
submission.
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES
5.1   Mandatory reporting legislation in relation to Climate Change came into force in
2015 with the IJB, as a public body, required to report annually on compliance with
climate change duties.  The relevant legislation is the Climate Change (Duties of Public
Bodies; Reporting Requirements) (Scotland) 2015 and the associated amendment
order of 2020.      
5.2  North Lanarkshire IJB has complied in full with reporting requirements since the
enactment of the legislation.  Further guidance specific to IJBs was issued by the
Scottish Government Domestic Climate Change Division for the 2021-2022 reporting
period.  This guidance relates to areas that NL IJB already reported on, including the
structure of the IJB and its links to the bodies it is in partnership with.  There is also a
requirement to report on Greenhouse gasses and other emissions, where possible,
and as requested, links have been made to the reports to be submitted by North
Lanarkshire Council and NHS Lanarkshire, the bodies with responsibilities in these
areas.   
6. CONCLUSIONS
6.1   The responsibility to enact measures to directly address climate change rests
with NLC and NHSL.  Emissions data is reported on in detail by those bodies.
6.2 The IJB’s Compliance with the 2021/2022 Climate Change reporting requirements
necessitates submission of the attached report by 30 November 2022. 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES
Yes  No  N/A

Page 3

As a public body, the IJB is required to comply with the legislation noted above along
with the current guidance issued by the Scottish Government Domestic Climate
Change Division. 
7.2 ASSOCIATED MEASURE(S) 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes   No  N/A 
Finance have provided confirmation of financial information included in the report. 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
7.5  PEOPLE 
7.6 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed: 
Yes  No  N/A 
8. BACKGROUND PAPERS   
 North Lanarkshire IJB 2022 Climate Change Report.
 Guidance for IJBs on Climate Change reporting requirements for the 2021-22
reporting period.
 Correspondence from Michael Mathieson, Cabinet Secretary, ‘Public Bodies’
Leadership on the global climate emergency’

Page 4

9. APPENDICES
Appendix 1 Public Bodies’ Leadership On The Global Climate Emergency
Appendix 2 Climate Change Report 
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please
contact the following:
Graeme Cowan, Senior Manager, Strategy and Performance.

Page 5

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot 
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot

 
Cabinet Secretary for Net Zero, Energy and Transport
Michael Matheson MSP 
T: 0300 244 4000
E: scottish.ministers@gov.scot 

Council Leaders and Chief Executives 
Chairs and Chief Executives of Public Bodies 
University and College Chairs and Principals 
Regional Transport Partnerships Chairs and
Leads 
___ 
May 2022 
PUBLIC BODIES’ LEADERSHIP ON THE GLOBAL CLIMATE EMERGENCY 
2022 is a crucial year for Scotland’s unique system of mandatory annual reporting by public
bodies on their statutory climate change duties. This year the reporting duties that were
strengthened in 2020 come into effect, which means that for the first time, in your annual
climate change reports to be submitted by the end of November, public bodies are required
to provide:
 where applicable, the body’s target date for achieving zero direct emissions of
greenhouse gases, or such other targets that demonstrate how the body is
contributing to Scotland achieving its emissions reduction targets 
 where applicable, targets for reducing indirect emissions of greenhouse gases
 how the body will align its spending plans and use of resources to contribute to
reducing emissions and delivering its emissions reduction targets
 how the body will publish, or otherwise make available, its progress to achieving its
emissions reduction targets
 where applicable, what contribution the body has made to helping deliver Scotland’s
Climate Change Adaptation Programme. 
I am delighted that many parts of the public sector in Scotland have already set ambitious
climate change targets. Many local authorities have particularly ambitious targets, NHS
Scotland, Scottish Water and Colleges Scotland all aim for net zero by 2040, the
Environment and Economy Leaders Group has committed to a decade of deep
decarbonisation, and Creative Scotland has set a target to become a net zero organisation
by 2030. 
I am also delighted that last year’s response rate among public bodies required to report was
excellent. It is important that we continue to have the highest possible compliance with the
new reporting duties this year - we need to ensure that the entire carbon footprint of the

Page 6

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot 
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot

 
public sector is covered by targets that are consistent with public bodies’ leadership role and
that public services are resilient to the impacts of climate change. 
In ensuring that public bodies report suitably ambitious targets by end of November,
Leaders, Chairs and Chief Executives will need to bear in mind the policy context that sits
alongside the strengthened legislation, as set out in the Scottish Government’s new
guidance co-developed with Sustainable Scotland Network (SSN): Public Sector Leadership
on the Global Climate Emergency, published on 29 October 2021. 
The Scottish Government and Scottish Green Party Shared Policy Programme commits to
developing and agreeing through consultation a series of phased targets for the
decarbonisation of public sector buildings starting in 2024, with the most difficult buildings
like hospitals being decarbonised by 2038, and for all publicly-owned buildings to meet zero
emission heating requirements, with a backstop of 2038. 
Programme for Government commitments include phasing out the need for fossil fuel cars
and vans in the public sector fleet by 2025 and larger vehicles no later than 2030. 
Public sector leaders must also take strong action to implement Programme for Government
commitments to tackle the significant new challenge of decarbonising the £13.3bn of annual
public sector procurement. 
In terms of available support, the Scottish Green Public Sector Estate Decarbonisation
Scheme provides a number of support mechanisms for heat decarbonisation and improving
energy efficiency across buildings owned by the public sector in Scotland. The Scheme will
distribute the £200 million of capital support pledged over the next 5-year period to aid the
decarbonisation of Scotland’s public sector estates. Transport Scotland is also assisting the
decarbonisation of the public sector fleet. 
The latest analysis shows that reported Scope 1 and Scope 2 emissions from Scotland’s
public bodies have reduced by almost a third in the six years since mandatory reporting
began in 2015-16. NHS Scotland has reduced emissions from its buildings by 64% since
1990. I am convinced if we continue to work together to address the challenges of pace,
skills and finance that we undoubtedly face in the crucial decade ahead, Scotland’s public
sector will continue to show strong leadership in tackling the global climate emergency. 
I will be addressing the Sustainable Scotland Network Spring Conference on 25 May to
emphasise the importance of public sector leadership, and public bodies’ climate change
reporting, to Scotland’s national endeavour on climate action.   
Michael Matheson

Page 7

Public Bodies Climate Change Duties Compliance Reporting Template 2021/22  
 
 
 
                      
 
 
 
 
1.Overview                  
 
 
 
 
This template is provided for public bodies required to report annually in accordance with the
Climate Change (Duties of Public Bodies Reporting Requirements) (Scotland) Order 2015, as
amended by the Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland)
Amendment Order 2020 which took effect for reporting periods commencing on or after 1 April
2021. 
Reports must be submitted to ccreporting@ed.ac.uk by 30th November. Late submissions may not
be accepted for analysis and may be classed as non-compliant with Public Bodies Duties legislative
reporting requirements. 
 
 
 
 
2. Guidance                  
 
 
 
 
1. Please save-as this workbook with your organisation's name in the title before completing  
 
 
 
 
2. Question 1f must be completed to ensure the correct emission factors are applied in Q3b,  
 
 
 
 
3. If you need to add more rows please email the file to ccreporting@ed.ac.uk    
 
 
 
 
4. Hybrid/homeworking emissions - please include an estimate of FTEs  working remotely - hybrid/home in the designated row provided in table 3b
 
 
 
    
In order for this to be calculated correctly the total no. of FTEs must be entered in Q1c     
 
 
 
 
5. Local Authorities completeing the recommended tab should select their local authority region at the top of the sheet
 
 
 
    
and their emissions will be provided automatically from BEIS datasets

Page 8

3. Colour Coding used in the template          
 
 
 
  
Dropdown box - select from list of options     
 
 
 
 
 
 
Uneditable/fixed entry cell    
 
 
 
  
Editable cell     
 
 
 
                      
 
 
 
                      
 
Public Sector Report on Compliance with Climate Change Duties 2022 Template 
PART 
1  Profile of Reporting Body                     
1a  Name of reporting body                     
 
 
Provide the name of the listed body (the "body") which prepared this report.                     
 
 
North Lanarkshire Integration Joint Board                     
1b  Type of body                     
 
 
Select from the options below                     
 
 
Integration Joint Boards                     
1c  Highest number of full‐time equivalent staff in the body during the report year                     
 
 
0
THIS 
MUS
T BE 
COM

Page 9

PLET
ED 
1d  Metrics used by the body                     
 
 
Specify the metrics that the body uses to assess its performance in relation to climate change and sustainability. 
 
 
 
 
 
 
 
 
 
Metric  Units  Val
ue 
C
o
m
m
e
n
t
s            
 
 
Please select from drop down box                     
 
 
Please select from drop down box                     
 
 
Please select from drop down box                     
 
 
Please select from drop down box                     
 
 
Please select from drop down box                     
 
 
Please select from drop down box                     
 
 
Please select from drop down box                     
 
 
Please select from drop down box                     
 
 
 
Other (please specify in comments)                      
 
 
 
Other (please specify in comments)                      
 
 
 
Other (please specify in comments)                      
 
 
 
Other (please specify in comments)                      
 
 
 
Other (please specify in comments)                      
 
 
 
Other (please specify in comments)                      
15   Other (please specify in comments)                      
1e  Overall budget of the body

Page 10

Specify approximate £/annum for the report year.                  
 
 
Budget  Budg
et 
Com
ment
s 
 
 
 
            
 
 
£702,633,000                     
1f  Report type                     
 
 
Specify the report year type                     
 
 
Report type  Repo
rt 
year 
com
ment
s 
 
 
 
            
 
 
Financial 
April 
21 ‐ 
Marc
h 22 
THI
S 
M
US
T 
BE 
CO
MP
LET
ED               
1g  Context                     
 
 
Provide a summary of the body's nature and functions that are relevant to climate change reporting.

Page 11

In line with the Public Bodies (Joint Working) (Scotland) Act 2014 and further than the minimum requirements, the 
strategic planning and monitoring of services set out in North Lanarkshire's (NL) Intergration Joint Board (IJB) 
Integration scheme have been delegated by the Council and the Health Board to the NL IJB, which then directs the 
Council and Health Board to deliver these services in line with its Strategic Plan and defined level of financial 
resources. Most services are provided for the people of North Lanarkshire, however, some services cover the 
entire the entire NHS Lanarkshire Board area, (for example, Mental Health and Learning Disability services, 
specialist children's health services, sexual health services, podiatry and dietetics.)  The resident population of 
North Lanarkshire is 341,140 and NHS Lanarkshire is 664,030 (NRS population estimates.)  The accountability and 
responsibility for climate change governance, management and strategy in relation to the delivery of Council and 
Health Board services (including community health and social care) lies with North Lanarkshire IJB's partner 
statuttory bodies; North Lanarkshire Council and NHS Lanarkshire. Both NLC and NHSL separately submit a Public 
Bodies Climate Change Duties Report.              
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Public Sector Report on Compliance with Climate Change Duties 2022 Template 
PART 2 
Governance, 
Management and 
Strategy 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Governance and 
management                     
2a  How is climate change governed in the body?            
 
 
Provide a summary of the roles performed by the body’s governance bodies and members in
relation to climate change. If any of the body’s activities in relation to climate change sit
outside its own governance arrangements (in relation to, for example, land use, adaptation,
transport, business travel, waste, information and communication technology, procurement or
behaviour change), identify these activities and the governance arrangements. Provide a
diagram / chart to outline the governance structure within the body.

Page 12

North Lanarkshire's Integration Joint Board is responsible for planning, commissioning and 
overseeing the delivery of community health and social care services for the six localities across 
North Lanarkshire.  It’s membership is drawn from North Lanarkshire Council, NHS Lanarkshire, 
professional health and care disciplines and third and independent sector organisations.  It plans 
and commissions local support and care services. These are delivered primarily by the council 
and NHS Lanarkshire working together in teams in a new integrated way, to transform, re‐design 
and improve the outcomes for people in North Lanarkshire.  The accountability and 
responsibility for climate change governance, management and strategy in relation to the 
delivery of Council and Health Board services (including community health and social care) lies 
with North Lanarkshire IJB's partner statutory bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council and NHS Lanarkshire submit a Public Bodies Climate 
Change Duties Report that will detail how this is managed. In June 2019, the Council declared a 
Climate Emergency was declared with a target to achieve net‐zero by 2030.  Climate change and 
carbon management arrangements continue to have a particular focus for both internal audit 
and risk teams, ensuring that there is a continuous drive for improvement within the 
organisation. THe council's commitment to continuously improve all aspects of our Climate 
Action has resulted in the transition of the Climate Change Group to a Board and the Health & 
Social Care Partnership is a engaged member of this Board ensuring continuity of approach and 
vision.  Health and Social Care North Lanarkshire works in close partnership as part of the council 
and fully support and contribute (where applicable) towards the council's targets in terms of 
asset management and energy consumption. Health & Social Care NL is also a key contributor to 
NHS Lanarkshire's Sustanability & Climate Change Strategy. More detail can be found at 
https://www.nhslanarkshire.scot.nhs.uk/download/2022‐october‐26‐board‐
papers/?wpdmdl=46337&refresh=63725780911611668437888&ind=1666703138625&filename
=2022‐October‐26‐Board‐21b.‐NHSL‐Sustainability‐Climate‐Change‐Strategy‐Final‐Draft‐for‐
Ratification‐20‐October‐2022.pdf             
 
 
<Insert Diagram Here or Attach File> 
 
 
 
 
 
 
 
2b  How is climate change action managed and embedded in the body?

Page 13

Provide a summary of how decision‐making in relation to climate change action by the body is 
managed and how responsibility is allocated to the body’s senior staff, departmental heads etc. 
If any such decision‐making sits outside the body’s own governance arrangements (in relation to, 
for example, land use, adaptation, transport, business travel, waste, information and 
communication technology, procurement or behaviour change), identify how this is managed 
and how responsibility is allocated outside the body. Provide a diagram to show how 
responsibility is allocated to the body’s senior staff, departmental heads etc.            
 
 
The accountability and responsibility for the management of decision‐making for climate change 
action in relation to the delivery of Council and Health Board services (including community 
health and social care) lies with North Lanarskire's IJB's partner statutory bodies, North 
Lanarkshire Council and NHS Lanarkshire.  Both NLC and NHSL  submit seperate and more 
detailed Public Bodies Climate Change Duties Report that will set out their decision making 
arrangements in detail. The IJB will take best available advice from its partner agencies in any 
strategic planning of services and considers any climate change impact when taking any planning 
decisions.             
 
 
<Insert Diagram Here or Attach File> 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Strategy                     
2c  Does the body have specific climate change mitigation and adaptation objectives in its 
corporate plan or similar document?            
 
 
Provide a brief summary 
of objectives if they exist. 
 
 
 
 
 
            
 
 
Wording of objective  Name of document  Document 
Link

Page 14

No embedded text on this page.

Page 15

2d  Does the body have a climate change plan or strategy?            
 
 
If yes, provide the name of any such document and details of where a copy of the document may 
be obtained or accessed.            
 
 
The accountability and responsibility for climate change governance, management and strategy 
in relation to the delivery of Council and Health Board services (including community health and 
social care) lies with North Lanarkshire IJB's partner statutory bodies, North Lanarkshire Council 
and NHS Lanarkshire. Both North Lanarkshire Council and NHS Lanarkshire submit a Public 
Bodies Climate Change Duties Report that will detail how this is managed.  
 
 
 
 
 
 
 
2e 
Does the body have any plans or strategies covering the following areas that include climate 
change?            
 
 
Provide the name of any such document and the 
timeframe covered.                  
 
 
Topic area  Name of document  Link  Time period covered 
Com
ment
s

Page 16

Adaptation                     
 
 
Business travel                     
 
 
Staff Travel                     
 
 
Energy efficiency                     
 
 
Fleet transport                     
 
 
ICT                     
 
 
Renewable energy                     
 
 
Sustainable/renewable 
heat                     
 
 
Waste management                     
 
 
Water and sewerage                     
 
 
Land Use                     
 
 
Other (please specify in 
comments)                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box

Page 17

Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box

Page 18

Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
 
 
Please select from drop 
down box                     
2f 
What are the body’s top 
5 priorities for climate 
change governance, 
management and 
strategy for the year 
ahead?

Page 19

Provide a brief summary 
of the body’s areas and 
activities of focus for the 
year ahead.                     
 
 
The accountability and responsibility for climate change governance, management and strategy 
in relation to the delivery of Council and Health Board services (including community health and 
social care) lies with North Lanarkshire IJB's partner statutory bodies, North Lanarkshire Council 
and NHS Lanarkshire. Both North Lanarkshire Council and NHS Lanarkshire submit a Public 
Bodies Climate Change Duties Report that will detail how this is managed.  
 
 
 
 
 
 
 
2g 
Has the body used the Climate Change Assessment Tool (a) or equivalent tool to self‐assess its 
capability / performance?            
 
 
If yes, please provide 
details of the key findings 
and resultant action 
taken.                      
 
 
(a) This refers to the tool developed by Resource Efficient Scotland for 
self‐assessing an organisation’s capability / performance in relation to 
climate change.

Page 20

The accountability and responsibility for climate change governance, management and strategy 
in relation to the delivery of Council and Health Board services (including community health and 
social care) lies with North Lanarkshire IJB's partner statutory bodies, North Lanarkshire Council 
and NHS Lanarkshire. Both North Lanarkshire Council and NHS Lanarkshire submit a Public 
Bodies Climate Change Duties Report that will detail how this is managed.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Further information                    
2h 
Supporting information 
and best practice                     
 
 
Provide any other relevant supporting information and any examples of best practice by the 
body in relation to governance, management and strategy.            
 
 
The accountability and responsibility for climate change governance, management and strategy 
in relation to the delivery of Council and Health Board services (including community health and 
social care) lies with North Lanarkshire IJB's partner statutory bodies, North Lanarkshire Council 
and NHS Lanarkshire. Both North Lanarkshire Council and NHS Lanarkshire submit a Public 
Bodies Climate Change Duties Report that will detail how this is managed.  
 
 
 
 
 
 
 
Public Sector Report on Compliance with Climate Change 
Duties 2022 Template                
PART 
3 
Corpor
ate

Page 21

Emissi
ons, 
Target
s and 
Projec
t Data 
 
 
Emissi
ons                                     
3a 
Emission
s from 
the start 
of the 
year 
which 
the 
body 
uses as 
a 
baseline 
(for its 
carbon 
footprin
t) to the 
end of 
the 
report 
year

Page 22

Complete the following table 
using the greenhouse gas 
emissions total for the body 
calculated on the same basis as 
for its annual carbon footprint / 
management reporting or, where 
applicable, its sustainability 
reporting. Include greenhouse gas 
emissions from the body’s estate 
and operations (a) (measured and 
reported in accordance with 
Scopes 1 & 2 and, to the extent 
applicable, selected Scope 3 of 
the Greenhouse Gas Protocol (b). 
If data is not available for any year 
from the start of the baseline year 
to the end of the report year, 
provide an explanation in the 
comments column.                            
 
 
(a) No information is required on 
the effect of the body on 
emissions which are not from its 
estate and operations.                            
 
 
(b) This refers to “The greenhouse 
gas protocol. A corporate 
accounting and reporting 
standard (revised edition)”, World 
Business Council for Sustainable 
Development, Geneva, 
Switzerland / World Resources 
Institute, Washington DC, USA 
(2004), ISBN: 1‐56973‐568‐9.

Page 23

ENSURE QUESTION 1f 
IS COMPLETED BEFORE 
STARTING THIS 
SECTION, THEN SELECT 
APPROPRIATE 
BASELINE YEAR 
 
                            
 
 
Referen
ce year  Year 
Y
e
a
r 
t
y
p
e Scope 1
Scope 
2 
Scop
e 3  Total  Units 
Comme
nts             
 
 
Baseline 
Year  2020/21 
F
i
n
a
n
c
i
a
l 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 31,874  
 
 
 
 
 
 
 
 
 
 
 
 
 
15,85
3  
 
 
 
 
 
 
 
 
 
 
 
 
15,04
3  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 62,770   tCO2e 
All 
emmiss
ions are 
emcom
passed 
within 
the 
organis
ational 
emissio
ns of 
NLC.  
Please 
refer to 
NLC's 
submiss
ion for 
further 
detail.

Page 24

3 
Year 1 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
4 
Year 2 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
5 
Year 3 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
6 
Year 4 
carbon 
footprint    
F
i
n
a
n
c         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e

Page 25

i
a
l 
7 
Year 5 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
8 
Year 6 
carbon 
footprint     
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
9 
Year 7 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
10 
Year 8 
carbon 
footprint    
F
i
n         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e

Page 26

a
n
c
i
a
l 
11 
Year 9 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
12 
Year 10 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
13 
Year 11 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e

Page 27

14 
Year 12 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
15 
Year 13 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
16 
Year 14 
carbon 
footprint    
F
i
n
a
n
c
i
a
l          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e                
17 
Year 15 
carbon 
footprint    
F
i
n
a
n
c         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐     tCO2e

Page 28

i
a
l 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3b 
Breakdo
wn of 
emissio
ns 
sources                                     
 
 
Complete the following table with the breakdown 
of emission sources from the body’s most recent 
carbon footprint (greenhouse gas inventory); this 
should correspond to the last entry in the table in 
3(a) above. Use the ‘Comments’ column to explain 
what is included within each category of emission 
source entered in the first column. If there is no 
data consumption available for an emission source 
enter the emissions in kgCO2e in the 
‘Consumption’ column of one of the “Other” rows 
and assign the scope and an emission factor of 1.                      
 
 
(a) Emissions factors are 
published annually by the UK 
Department for Business, Energy 
& Industrial Strategy    
 
 
 
                   
 
 
Emission 
Factor 
Year 
2021  The emission factor 
year is auto‐
assigned based on 
your answer to Q1f, 
if it is incorrect 
please contact SSN.                         
 
 
You can 
now 
filter

Page 29

emission 
sources 
by 
"type" in 
column 
C to 
enable 
quicker  
selection 
of 
emission 
source 
in 
column 
D. 
 
 
User 
defined 
emission 
sources 
can be 
entered 
below 
remote/
homewo
rking 
emission
s ‐ rows 
101 to 
129. If 
you 
require 
extra 
rows in

Page 30

the table 
please 
send the 
templat
e to 
ccreporti
ng@ed.a
c.uk. 
 
 
Emission   Emissio
n source 
S
c
o
p
e
Consu
mption 
data 
Units 
Emis
sion 
facto
r 
Units 
Emiss
ions 
(tCO2
e) 
Comme
nts 
 
 
 
 
 
 
 
 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 31

d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 32

o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
drop 
Please 
select 
from 
drop 
P
l
e
a            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 33

down 
box 
down 
box 
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 34

c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 35

d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 36

w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 37

Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 38

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 39

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 40

o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 41

b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
Please 
select 
from 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 42

drop 
down 
box 
drop 
down 
box 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 43

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 44

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 45

o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 46

Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 47

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 48

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 49

o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 50

b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
Please 
select 
from 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 51

drop 
down 
box 
drop 
down 
box 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 52

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 53

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 54

o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 55

Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 56

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 57

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 58

o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 59

b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
Please 
select 
from 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 60

drop 
down 
box 
drop 
down 
box 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 61

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 62

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 63

o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 64

Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 65

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 66

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 67

o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 68

b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
Please 
select 
from 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 69

drop 
down 
box 
drop 
down 
box 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 70

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 71

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 72

o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 73

Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 74

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 75

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 76

o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 77

b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
Please 
select 
from 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 78

drop 
down 
box 
drop 
down 
box 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 79

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 80

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 81

o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 82

Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
Please 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 83

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Hybrid/
Homew
orking 
emission
s 
S
c
o
p
e 
3
100.00
%
perce
ntage 
of 
total 
FTEs  
0.300
00
tCO2e/F
TE/annu
m 
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 84

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 85

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 86

o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 87

b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
 
 
Other 
(please 
specify 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 88

in 
commen
ts) 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 89

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 90

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 91

o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 92

Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 93

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 94

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 95

o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 96

b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
 
 
Other 
(please 
specify 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 97

in 
commen
ts) 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 98

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 99

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 100

o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 101

Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 102

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 103

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 104

o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n             
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 105

b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x             
 
 
 
 
 
 
 
 
 
 
 
 ‐                   
 
 
 
 
Other 
(please 
specify 
P
l
e            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 106

in 
commen
ts) 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
 
 
Other 
(please 
specify 
in 
commen
ts) 
P
l
e
a
s
e 
s
e
l            
 
 
 
 
 
 
 
 
 
 
 
 ‐

Page 107

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
95                       0.0                 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Total is 
differen
t to 
that 
number 
quoted 
in Q3a, 
please 
check 
and/or 
state 
why in 
comme

Page 108

nts cell 
above 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3c 
Generation, 
consumption and 
export of 
renewable energy                                  
 
 
Provide a summary of 
the body’s annual 
renewable generation 
(if any), and whether it 
is used or exported by 
the body.                               
 
 
Technol
ogy 
Renewable 
Electricty 
Renewable 
Heat                         
 
 
Total 
consum
ed by 
the 
body 
(kWh) 
T
o
t
a
l 
e
x
p
o
r
t
e
d 
(
k
W
h
) 
Total 
consum
ed by 
the 
body 
(kWh) 
Total 
expor
ted 
(kWh
) 
Com
ment
s

Page 109

Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from

Page 110

drop 
down 
box 
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box

Page 111

Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
Please 
select 
from 
drop 
down 
box                                     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Target
s                                     
3d 
Organis
ational 
targets                                     
 
 
List all of the body’s targets of 
relevance to its climate change 
duties. Where applicable, targets 
for reducing indirect emissions of 
greenhouse gases, overall carbon 
targets and any separate land use, 
energy efficiency, waste, water, 
information and communication

Page 112

technology, transport, travel and 
heat targets should be included. 
Where applicable, you should also 
provide the body’s target date for 
achieving zero direct emissions of 
greenhouse gases, or such other 
targets that demonstrate how the 
body is contributing to Scotland 
achieving its emissions reduction 
targets. 
 
 
Name of 
target 
Type of 
target 
T
a
r
g
e
t  Units 
Boun
dary/
scope 
of 
target
Year 
used 
as 
basel
ine 
Baselin
e figure 
Units 
of 
basel
ine 
Target 
comple
tion 
year 
Progress 
against 
target 
C
o
m
m
e
n
t
s       
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
 
Pleas
e 
selec
t 
from    
Pleas
e 
select 
from 
drop 
Please 
select 
from 
drop 
down 
box

Page 113

down 
box 
drop 
down 
box  
down 
box 
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from    
Please 
select 
from 
Pleas
e 
select 
 
Pleas
e    
Pleas
e 
select 
Please 
select 
from

Page 114

drop 
down 
box 
drop 
down 
box 
from 
drop 
down 
box 
selec
t 
from 
drop 
down 
box  
from 
drop 
down 
box 
drop 
down 
box 
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box

Page 115

Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
 
Pleas
e 
selec
t 
from    
Pleas
e 
select 
from 
drop 
Please 
select 
from 
drop 
down 
box

Page 116

down 
box 
drop 
down 
box  
down 
box 
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from    
Please 
select 
from 
Pleas
e 
select 
 
Pleas
e    
Pleas
e 
select 
Please 
select 
from

Page 117

drop 
down 
box 
drop 
down 
box 
from 
drop 
down 
box 
selec
t 
from 
drop 
down 
box  
from 
drop 
down 
box 
drop 
down 
box 
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box

Page 118

Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
 
Pleas
e 
selec
t 
from    
Pleas
e 
select 
from 
drop 
Please 
select 
from 
drop 
down 
box

Page 119

down 
box 
drop 
down 
box  
down 
box 
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from    
Please 
select 
from 
Pleas
e 
select 
 
Pleas
e    
Pleas
e 
select 
Please 
select 
from

Page 120

drop 
down 
box 
drop 
down 
box 
from 
drop 
down 
box 
selec
t 
from 
drop 
down 
box  
from 
drop 
down 
box 
drop 
down 
box 
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
Please 
select 
from 
drop 
down 
box    
Please 
select 
from 
drop 
down 
box 
Pleas
e 
select 
from 
drop 
down 
box 
 
Pleas
e 
selec
t 
from 
drop 
down 
box     
Pleas
e 
select 
from 
drop 
down 
box 
Please 
select 
from 
drop 
down 
box             
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3da 
How will the body align its 
spending plans and use of 
resources to contribute to 
reducing emissions and 
delivering its emission reduction 
targets?                             
 
 
Provide any relevant supporting 
information

Page 121

3db 
How will the body publish, or 
otherwise make available, it's 
progress towards achieving its 
emissions reduction targets?                            
 
 
Provide any other relevant 
supporting information. In the 
event that the body wishes to 
refer to information already 
publshed, provide information 
about where the publication can 
be accessed.                            
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Projec
ts and

Page 122

chang
es 
3e 
Estimated total annual carbon 
savings from all projects 
implemented by the body in the 
report year                            
 
 
If no projects were implemented 
against an emissions source, enter 
"0". 
If the body does not have any 
information for an emissions 
source, enter “Unknown”. 
If the body does not include the 
emissions source in its carbon 
footprint, enter “N/A”.                            
 
 
Emission
s source 
Total 
estimat
ed 
annual 
carbon 
savings 
(tCO2e) 
C
o
m
m
e
n
t
s                               
 
 
Electricit
y       
 
                            
 
 
Natural 
gas       
 
                            
 
 
Other 
heating 
fuels       
 
                            
 
 
Waste

Page 123

Water 
and 
sewerag
e       
 
                            
 
 
Travel                                     
 
 
Fleet 
transpor
t       
 
                            
 
 
Other 
(please 
specify 
in 
commen
ts)       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box

Page 124

Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from

Page 125

drop 
down 
box 
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box

Page 126

Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Total 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐       
 
                            
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3f  Detail the top 10 carbon 
reduction projects to be carried 
out by the body in the report 
year                            
 
 
Provide details of the 10 projects 
which are estimated to achieve 
the highest carbon savings during 
report year.                            
 
 
Project 
name 
Funding 
source 
F
i
r
s
t 
f
u
ll 
y
e
a
r 
o
f 
C
O
Are 
these 
savings 
figures 
estimat
ed or 
actual?  
Capit
al 
cost 
(£) 
Oper
ation
al 
cost 
(£/an
num) 
Project 
lifetime 
(years) 
Prim
ary 
fuel/
emiss
ion 
sourc
e 
save
d 
Estimat
ed 
carbon 
savings 
per 
year 
(tCO2e/
annum) 
Estimate
d costs 
savings 
(£/annu
m) 
B
e
h
a
v
i
o
u
r 
C
h
a
n
g
e
Co
m
me
nts

Page 127

2
e 
s
a
v
i
n
g
s 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n

Page 128

b
o
x 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x       
 
 
 
 
 
 
P
l
e
Please 
select 
from          
Pleas
e 
select       
P
l
e

Page 129

a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
drop 
down 
box 
from 
drop 
down 
box 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l

Page 130

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o

Page 131

m 
d
r
o
p 
d
o
w
n 
b
o
x 
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d

Page 132

o
w
n 
b
o
x 
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x

Page 133

P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x       
 
 
 
 
 
 
P
l
e
a
s
e 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop       
P
l
e
a
s
e

Page 134

s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
down 
box 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t

Page 135

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r

Page 136

o
p 
d
o
w
n 
b
o
x 
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n

Page 137

b
o
x 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x       
 
 
 
 
 
 
P
l
e
Please 
select 
from          
Pleas
e 
select       
P
l
e

Page 138

a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
drop 
down 
box 
from 
drop 
down 
box 
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l

Page 139

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
e
c
t 
f
r
o
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
Please 
select 
from 
drop 
down 
box          
Pleas
e 
select 
from 
drop 
down 
box       
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o

Page 140

m 
d
r
o
p 
d
o
w
n 
b
o
x 
m 
d
r
o
p
d
o
w
n 
b
o
x 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3g 
Estimated decrease or increase in 
the body’s emissions attributed 
to factors (not reported 
elsewhere in this form) in the 
report year                            
 
 
If the emissions increased or 
decreased due to any such factor 
in the report year, provide an 
estimate of the amount and 
direction                            
 
 
Emission
s source 
Total 
estimat
ed 
annual 
emissio
ns 
(tCO2e) 
I
n
c
r
e
a
s
e 
o
r 
Comme
nts

Page 141

d
e
c
r
e
a
s
e 
i
n 
e
m
i
s
s
i
o
n
s 
 
 
Estate 
changes    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f

Page 142

r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Service 
provisio
n    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r

Page 143

o
p 
d
o
w
n 
b
o
x 
 
 
Staff 
numbers    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w

Page 144

n 
b
o
x 
 
 
Other 
(please 
specify 
in 
commen
ts)    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x

Page 145

Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x    
 
                         
 
 
Please 
select 
from 
drop    
 
P
l
e
a

Page 146

down 
box 
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l

Page 147

e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r

Page 148

o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o

Page 149

p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n

Page 150

b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x    
 
                         
 
 
Please 
select    
 P

Page 151

from 
drop 
down 
box 
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Total    
 
 
 
 ‐      
 
                         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3h 
Anticipated annual 
carbon savings 
from all projects 
implemented by

Page 152

the body in the 
year ahead 
 
 
If no projects are expected to be 
implemented against an 
emissions source, enter “0”. 
If the organisation does not have 
any information for an emissions 
source, enter “Unknown”. 
If the organisation does not 
include the emissions source in its 
carbon footprint, enter “N/A”.                            
 
 
Emission
s source 
Total 
estimat
ed 
annual 
carbon 
savings 
(tCO2e) 
C
o
m
m
e
n
t
s                               
 
 
Electricit
y       
 
                            
 
 
Natural 
gas       
 
                            
 
 
Other 
heating 
fuels       
 
                            
 
 
Waste                                     
 
 
Water 
and 
sewerag
e       
 
                            
 
 
Travel

Page 153

Fleet 
Transpor
t       
 
                            
 
 
Other 
(please 
specify 
in 
commen
ts)       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box

Page 154

Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from

Page 155

drop 
down 
box 
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Please 
select 
from 
drop 
down 
box       
 
                            
 
 
Total 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ‐       
 
                            
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3i 
Estimated decrease or increase in 
emissions from other sources in 
the year ahead                            
 
 
If the body’s corporate emissions 
are likely to increase or decrease 
for any other reason in the year 
ahead, provide an estimate of the 
amount and direction.                            
 
 
Emission
s source 
Total 
estimat
ed 
annual 
emissio
ns 
(tCO2e) 
I
n
c
r
e
a
s
Comme
nts

Page 156

e 
o
r 
d
e
c
r
e
a
s
e 
i
n 
e
m
i
s
s
i
o
n
s 
 
 
Estate 
changes    
 
P
l
e
a
s
e 
s
e
l
e

Page 157

c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Service 
provisio
n    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o

Page 158

m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Staff 
numbers    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p

Page 159

d
o
w
n 
b
o
x 
 
 
Other 
(please 
specify 
in 
commen
ts)    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b

Page 160

o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x    
 
                         
 
 
Please 
select 
from    
 
P
l

Page 161

drop 
down 
box 
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s

Page 162

e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t

Page 163

f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d

Page 164

r
o
p 
d
o
w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o

Page 165

w
n 
b
o
x 
 
 
Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x

Page 166

Please 
select 
from 
drop 
down 
box    
 
P
l
e
a
s
e 
s
e
l
e
c
t 
f
r
o
m 
d
r
o
p 
d
o
w
n 
b
o
x    
 
                         
 
 
Total    
 
 
 
 ‐      
 
                         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3j 
Total carbon reduction project 
savings since the start of the year

Page 167

which the body used as a 
baseline for its carbon footprint 
 
 
If the body has data available, 
estimate the total emissions 
savings made from projects since 
the start of that year ("the 
baseline year").                            
 
 
Total 
savings 
Total 
estimat
ed 
emissio
ns 
savings 
(tCO2e) 
C
o
m
m
e
n
t
s 
 
                            
 
 
Total 
project 
savings 
since 
baseline 
year       
 
                            
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Furthe
r 
inform
ation 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3k 
Supporting information and best 
practice                            
 
 
Provide any other relevant 
supporting information and any 
examples of best practice by the

Page 168

body in relation to corporate 
emissions, targets and projects. 
 
 
The accountability and 
responsibility for climate change 
governance, management and 
strategy in relation to the delivery 
of Council and Health Board 
services (including community 
health and social care) lies with 
North Lanarkshire IJB's partner 
statutory bodies, North 
Lanarkshire Council and NHS 
Lanarkshire. Both North 
Lanarkshire Council and NHS 
Lanarkshire submit a Public 
Bodies Climate Change Duties 
Report that will detail how this is 
managed.                             
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Public Sector Report on Compliance with Climate Change Duties 2022 Template 
 
 
P
A
R
T 
4 
Adaptation                      
 
 
 
 
Assessing and 
managing risk

Page 169

4a 
Has the body assessed 
current and future 
climate‐related risks? 
 
 
 
             
 
 
 
 
If yes, provide a reference or link to any such 
risk assessment(s).             
 
 
 
 
The accountability and responsibility for 
climate change governance, management and 
strategy in relation to the delivery of Council 
and Health Board services (including 
community health and social care) lies with 
North Lanarkshire IJB's partner statutory 
bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council 
and NHS Lanarkshire submit a Public Bodies 
Climate Change Duties Report that will detail 
how this is managed.  
 
 
 
 
 
 
 
 
 
 
4b
What arrangements does the body have in 
place to manage climate‐related risks?              
 
 
 
 
Provide details of any climate change 
adaptation strategies, action plans and risk 
management procedures, and any climate 
change adaptation policies which apply across 
the body.

Page 170

The accountability and responsibility for 
climate change governance, management and 
strategy in relation to the delivery of Council 
and Health Board services (including 
community health and social care) lies with 
North Lanarkshire IJB's partner statutory 
bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council 
and NHS Lanarkshire submit a Public Bodies 
Climate Change Duties Report that will detail 
how this is managed.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Taking action                      
 
 
4c 
What action has 
the body taken to 
adapt to climate 
change?                       
 
 
 
 
Include details of work to increase awareness 
of the need to adapt to climate change and 
build the capacity of staff and stakeholders to 
assess risk and implement action. The body 
may wish to make reference to the Scottish 
Climate Change Adaptation Programme  (“the 
Programme”).

Page 171

4d
Where applicable, 
what contribution 
has the body 
made to helping 
deliver the 
Programme?                      
 
 
 
 
Provide any other 
relevant supporting 
information                   
 
 
 
 
The accountability and responsibility for 
climate change governance, management and 
strategy in relation to the delivery of Council 
and Health Board services (including 
community health and social care) lies with 
North Lanarkshire IJB's partner statutory 
bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council 
and NHS Lanarkshire submit a Public Bodies

Page 172

Climate Change Duties Report that will detail 
how this is managed.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Review, 
monitoring 
and 
evaluation 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4e
What 
arrangements 
does the body 
have in place to 
review current 
and future climate 
risks?                      
 
 
 
 
Provide details of arrangements to review 
current and future climate risks, for example, 
what timescales are in place to review the 
climate change risk assessments referred to in 
Question 4(a) and adaptation strategies, 
action plans, procedures and policies in 
Question 4(b).

Page 173

The accountability and responsibility for 
climate change governance, management and 
strategy in relation to the delivery of Council 
and Health Board services (including 
community health and social care) lies with 
North Lanarkshire IJB's partner statutory 
bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council 
and NHS Lanarkshire submit a Public Bodies 
Climate Change Duties Report that will detail 
how this is managed.              
 
 
4f 
What arrangements does the body 
have in place to monitor and evaluate 
the impact of the adaptation actions?                
 
 
 
 
Please provide details of monitoring and 
evaluation criteria and adaptation indicators 
used to assess the effectiveness of actions 
detailed under Question 4(c) and Question 
4(d).             
 
 
 
 
The accountability and responsibility for 
climate change governance, management and 
strategy in relation to the delivery of Council 
and Health Board services (including 
community health and social care) lies with 
North Lanarkshire IJB's partner statutory 
bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council 
and NHS Lanarkshire submit a Public Bodies 
Climate Change Duties Report that will detail 
how this is managed.

Page 174

Future 
priorities for 
adaptation 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4g 
What are the body’s top 5 climate change 
adaptation priorities for the year ahead?             
 
 
 
 
Provide a summary of the areas and activities 
of focus for the year ahead.             
 
 
 
 
The accountability and responsibility for 
climate change governance, management and 
strategy in relation to the delivery of Council 
and Health Board services (including 
community health and social care) lies with 
North Lanarkshire IJB's partner statutory 
bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council 
and NHS Lanarkshire submit a Public Bodies 
Climate Change Duties Report that will detail 
how this is managed.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Further 
information                      
 
 
4h Supporting information and best practice             
 
 
 
 
Provide any other relevant supporting 
information and any examples of best practice 
by the body in relation to adaption.

Page 175

The accountability and responsibility for 
climate change governance, management and 
strategy in relation to the delivery of Council 
and Health Board services (including 
community health and social care) lies with 
North Lanarkshire IJB's partner statutory 
bodies, North Lanarkshire Council and NHS 
Lanarkshire. Both North Lanarkshire Council 
and NHS Lanarkshire submit a Public Bodies 
Climate Change Duties Report that will detail 
how this is managed.  
 
 
 
 
 
 
 
 
Public Sector Report on Compliance with Climate Change Duties 2022 Template 
PART 
5  Procurement                
5a 
How have procurement policies contributed to compliance with climate 
change duties?                
 
 
Provide information relating to how the procurement policies of the body have 
contributed to its compliance with climate changes duties.

Page 176

North Lanarkshire IJB has no legal basis on which to procure community health and 
social care services. This is a function of North Lanarkshire Council and NHS Lanarkshire.  
Both North Lanarkshire Council and NHS Lanarkshire submit a Public Bodies Climate 
Change Duties Report that will detail their arrangements.  
 
 
 
 
5b 
How has procurement activity contributed to compliance with climate 
change duties?                
 
 
Provide information relating to how procurement activity by the body has contributed 
to its compliance with climate changes duties.         
 
 
North Lanarkshire IJB has no legal basis on which to procure community health and 
social care services. This is a function of North Lanarkshire Council and NHS Lanarkshire.  
Both North Lanarkshire Council and NHS Lanarkshire submit a Public Bodies Climate 
Change Duties Report that will detail their arrangements.

Page 177

Further information                
5c  Supporting information and best practice                
 
 
Provide any other relevant supporting information and any examples of best practice by 
the body in relation to procurement.         
 
 
North Lanarkshire IJB has no legal basis on which to procure community health and 
social care services. This is a function of North Lanarkshire Council and NHS Lanarkshire.  
Both North Lanarkshire Council and NHS Lanarkshire submit a Public Bodies Climate 
Change Duties Report that will detail their arrangements.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Public Sector Report on Compliance with Climate Change Duties 2022 Template 
P
A
R
T 
6 
Validation and 
Declaration                      
6
a 
Internal validation 
process

Page 178

Briefly describe the 
body’s internal 
validation process, if 
any, of the data or 
information 
contained within 
this report.                      
 
 
N/A 
 
 
 
 
 
 
 
 
6
b 
Peer validation 
process                      
 
 
Briefly describe the 
body’s peer 
validation process, if 
any, of the data or 
information 
contained within 
this report.                      
 
 
N/A 
 
 
 
 
 
 
 
 
6
c 
External validation 
process

Page 179

Briefly describe the 
body’s external 
validation process, if 
any, of the data or 
information 
contained within 
this report.                      
 
 
N/A 
 
 
 
 
 
 
 
 
6
d 
No Validation 
Process                      
 
 
If any information provided in this report 
has not been validated, identify the 
information in question and explain why it 
has not been validated. 
 
             
 
 
N/A 
 
 
 
 
 
 
 
 
6
e  Declaration                      
 
 
I confirm that the information in this report is 
accurate and provides a fair representation of the 
body’s performance in relation to climate change.

Page 180

Name: 
Julie 
McGee                   
 
 
Role in the body: 
Senior 
Officer                   
 
 
Date: 
21/11/2
022