REPORT 
Item No: 10 
1. PURPOSE OF REPORT
This paper is coming to the IJB; 
The purpose of this report is to provide a summary to the Integration Joint Board
(IJB) on risk management activity, noting any amendments or additions to the
current risk register. 
2. ROUTE TO THE INTEGRATION JOINT BOARD
This paper has been: 
Prepared   Reviewed   Endorsed 
By: The Senior Leadership Team 
3. RECOMMENDATIONS 
3.1 The IJB is asked to note the contents of the report which includes the latest
version of the IJB risk register and a note of those operational risks
highlighted by the Heath & Social Care North Lanarkshire partnership that
impact upon delivery of IJB business. 
4.  VARIATIONS TO DIRECTIONS? 
5. BACKGROUND/SUMMARY OF KEY ISSUES 
5.1  From a good practice and sound governance perspective, all public bodies
are required to identify and take account of the impact of any potential risks in
delivering their business. 
SUBJECT:  Risk Management: IJB Risk Register 
TO:  IJB 
Lead
Officer for
Report: 
Ross McGuffie, Chief Officer North HSCP
Author(s)
of Report 
Ross McGuffie, Chief Officer  North HSCP
DATE:  30th November 2022  
For
approval 
For endorsement  To note 
Yes  No  N/A

Page 2

2 
 
5.2  The PF&A Committee has delegated oversight and responsibility for financial
and performance risks associated with the remit of the Integration Joint Board
and the PF&A committee considered the risk register at its last meeting on
31st August 2022. No changes to the risk rating were recommended at that
meeting however the actions associated with each risk have been updated. 
5.3  Four new risks were added to the IJB Risk Register and agreed at the
September meeting of the IJB:
 IJB 15/22 – Cost of Living impacts
 IJB 16/22 – National Care Service
 IJB 17/22 – Unscheduled Care and patient flows
 IJB 18/22 – Community Alarms 
5.4 There are currently three risks rated as Very High on the IJB risk register.
 IJB 08/21 – Financial Implications of Responding to Covid 
 IJB 09/21 – Impact on the Strategic Plan due to Covid 
 IJB 17/22 – Unscheduled care and patient flows 
5.5 These risks were reviewed on 2nd November 2022 and will be subject to
further review with the new Chief Finance Officer as part of the financial
planning exercise for 2022/23. 
5.6  There are seven high rated risks on the IJB risk register.
 IJB 01/21 - Financial Challenges 
 IJB 04/21 - Notional Set Aside Budget 
 IJB 13/21 - Impact on discharge performance linked to care homes. 
 IJB 12/21 - Staff Health & wellbeing 
 IJB 14/22 - CAMHS
 IJB 15/22 – Cost of Living
 IJB 16/22 – National Care Service 
5.7 There are a number of high/very high rated operational risks recorded on
NHSL and NLC risk systems that have been identified as having or potentially
having an impact on IJB objectives and/or delivery of services. 
No/Ref Risk Risk
Rating
Lead
Organisation/Area
2115 CAMHS Service - There is a risk
that the CAMHS service cannot
meet the increasing clinical
demands due to a significantly
high number of cumulative staff
vacancies for both clinical and
non-clinical posts and challenges
recruiting to new posts identified
through the national recovery and
renewal fund.  This is impacting on
community, in- patient and out-
patient care with the potential to
adversely affect response time to
referrals; longer waiting times;
poorer outcomes; delays in
redesign and reputation of NHSL
High NHSL Corporate

Page 3

3 
 
1710  Public Protection: There is a risk
that NHSL could fail to identify
harm to any vulnerable person,
child or adult, or prevent harm to
others resulting from the
complexities of opportunity lost
due to the current reprioritising of
services in response to COVID-19.
High  NHSL Corporate 
2039  Staff Fatigue, Resilience,
Wellbeing & Safety – Effects of
prolonged Covid response is
adversely impacting  on staff,
increasing  staff absence and
consequently reducing  workforce
capacity.
Very
High 
NHSL Corporate 
2126 Sustaining Out of Hours Primary
Care Service
Very
High 
NHSL Corporate 
2086  Sustaining GP Services  Very
High 
NHSL Corporate 
2129 Sustaining Whole System Patient
Flow
Very
High 
NHSL –
Corporate 
NLC RIA0000446 Unable to deliver services due to
funding issues 
Very
High 
NLC  - Social
Care/Social Work 
NLC RIA0000448  Availability of workforce to deliver
services within legislative and
regulatory compliance
requirements.
High  NLC – Social
Care/Social Work 
NLC RIA0000449 Information & Data Protection –
non-compliance with information
governance legislation, standards
and processes and data security
and inability to retrieve relevant
data with deadlines 
High  NLC – Social
Care/Social Work 
NLC RIA0000450 Health & Safety of staff in SW &
partnership companies – failure to
ensure the health safety and
welfare at work of the service,
employees, partners and  provider
agencies 
High  NLC – Social
Care/Social Work
NLC RIA0000453 Supplier failure or services not
provided to required standard.
Insufficient number of providers. 
High  NLC – Social
Care/Social Work
NLC RIA0000457 Inadequate supervision,
governance and monitoring across
professional workforce 
High  NLC – Social
Work/Social care
NLC RIA0000458  IT system not fit for purpose  High  NLC – Social
Work/Social care
NLC RIA0000459 Integration – there is a risk that
services and not integrated
effectively thus impacting on
improving the outcomes for
individuals receiving care and
support 
High  NLC – Social
Work/Social care

Page 4

4 
 
NLC RIA0000460 Performance & planning –
increasing expectations and
changing performance demands
will result in a failure to provide
performance information internal,
external and including S Govt, 
High  NLC – Social
Work/Social care
NLC RIS0000414 Community alarm and assistive
technology – unable to continue to
support people with a community
alarm system and develop use of
assistive technology 
Very
High 
NLC – Social
Work/Social care
NLC RIS0000415 Mental Health Officers – Failure to
comply with legal obligations 
High  NLC – Social
Work/Social care
NLC RIS0000417  Communications strategies and
engagement plans – Inadequate
strategies not aligned with
strategic objectives  
High  NLC – Social
Work/Social care
NLC RIS000419 Non- compliance with Information
Governance & Data Protection 
High  NLC – Social
Work/Social care
NLC RIS000426 Analogue to digital transition &
ability to provide a working
community alarm service 
High NLC – Social
Work/Social care 
6. CONCLUSIONS 
6.1 The IJB currently has 18 risks identified on its IJB risk register with ten
risks rated as high or very high. 
6.2 Risks identified by H&SC NL as potentially impacting on IJB business
are highlighted in the report. 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES  
N/A 
7.2 ASSOCIATED MEASURE(S) 
N/A 
7.3 FINANCIAL 
This paper has been reviewed by Finance: 
Yes   No  N/A 
Financial risks are identified in the risk register. 
7.4 RISK ASSESSMENT/RISK MANAGEMENT 
This report sets out the IJB risk register and risk assurance process for
the IJB 
7.5  PEOPLE 
N/A

Page 5

5 
 
7.6  STAKEHOLDER ENGAGEMENT 
Stakeholders are represented at the IJB and the IJB PFA Committee
and fully contribute to approval and amendments to the IJB risk
register. 
7.7 INEQUALITIES & FAIRER SCOTLAND DUTY 
8. BACKGROUND PAPER 
None. 
9. APPENDICES 
IJB Risk Register   Appendix 1   
CHIEF ACCOUNTABLE OFFICER (or Depute)   
Members seeking further information about any aspect of this report, please
contact Ross McGuffie on telephone number 01698 752591. 
Yes  No  N/A

Page 6

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 30/06/22)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
Risk Closed ‐ 
Changes By MM
IJB02.
21
Financial
Reputational
01/04/2021
Ineffective Governance Arrangements
There is a risk that the IJB is unable to prevent and detect fraud and corruption within services because of 
inadequate governance arrangements and inadequate internal control systems which could lead to financial and 
reputational damage.
LOW CONTROLS
1. Fraud awareness e‐learning.
2. National Fraud initiative.
3. Locality/SW Enablement Groups.
4. Segregation of duties in relation to authorising and processing direct payments.
5  Whistle blowing policies.
6. Procurement processes and standing orders.
7. Oversight via NLC Audit and Scrutiny Panel and NHSL Audit Committee.
8.  Effective governance arrangements are in place and subject to internal and external audit review.
9.  IJB and IJB PFA meetings established ensuring effective oversight of financial performance.
ACTIONS
1. Continue to raise fraud awareness through team briefings.
2.   Planned Procurement and Standing Financial Instructions presentations at Extended SLT by 31 March 2022.
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.03.22
Previously IJB6.
Reviewed and 
updated on 15 
May 21.
Previously IJB2, 
IJB7, IJB10 and 
IJB12.
HIGH
M
EDIUM
M
arie M
oy
M
arie M
oy
SLT, IJB PFA, IJB
31.12.2022
IJB.01/
21
Financial
Strategic
01/04/2021
Financial Challenges
There are a range of financial challenges which will impact on the IJB's ability to deliver the Strategic 
Commissioning Plan intentions within the financial envelope available.  These include:
1.  The absence of a unique IJB financial settlement from the Scottish Government.
2.  The IJB is dependent on funding from both partners.
3.  Late Scottish Government financial settlement.
4.  Budget reductions due to insufficient Scottish Government financial settlements and/or partner contributions.
5.  New Scottish Government policy commitments e.g. Carers (Scotland) Act 2016.
6.  Demographic growth.
7.  Competing service priorities.
8.  Conflicting partner efficiency savings programmes which adversely impact on the HSCP's ability to deliver 
services.
9.  In‐year cost pressures emerging due to the underachievement of planned savings, pandemics and other 
emerging risks which may lead to an overspend.
10.  Each partner may be unable to maintain their financial contributions to the IJB in future years which would 
impact on frontline health and social care services. 
11. The agreed transformational plans and service redesigns are not implemented in full and in line with the 
original implementation plan and/or do not secure the intended improvement outcomes in both performance 
standards and financial efficiency targets.
12.  Future savings targets will continue to be challenging and are likely to impact on essential core services.
13.  The IJB Financial Plan cannot be adhered to and budget recovery plans fail to achieve financial balance for 
both partners.
14. The impact of the pandemic on the financial sustainability of external providers in particular social care 
providers.
15.  The financial implications of the impact of the pandemic on the workforce e.g. increase in sickness absence, 
early retirement requests and recruitment challenges.
16.  Additional Scottish Government funding to address Covid‐19 costs and to progress the Remobilisation and 
Recovery Plan in 2021/2022 is not sufficient.
The above factors would lead to a failure to achieve the desired strategic aims and would also impact on service 
delivery.
CONTROLS
1.     IJB PFA Committee.
2.     IJB Chief Officer is a member of each partner's key decision‐making forums.
3.     Effective joint working between Chief Financial Officer and both Council and NHS Finance Departments.
4.     Regular budget meetings with Chief Executives and Directors of Finance.
5.     Regular HSCP budget monitoring meetings across Senior Leadership Team.
6.     The IJB Financial Plan 2021/2022 has been agreed and is being reviewed regularly. The IJB Financial plan 2022/23 is being developed.
7.     Capacity plans in place  to maximise efficiency.
8.     IJB Integration Scheme setting out the budget recovery processes.
9.     IJB Financial Regulations and financial procedures.
10.   Consultation and involvement with key stakeholders including service users and carers.
11.   Prescribing Quality and Efficiency Programme, SWEG, ARG and Home Support monitoring groups are in place.
12.   Joint Strategic Needs Assessment and ongoing move towards preventative and anticipatory approaches.
13.   Strategic Planning Group, Locality engagement sessions and Partnership Boards.
14.   Effective and ongoing service user engagement, staff consultation and Trade Union liaison at strategic and local levels.
15.   Financial sustainability payment arrangements in place to 30 June 2022 to support external social care providers.
16.   A Change Fund of £6.076m has been agreed with the Scottish Government.
17.  The Scottish Government announced on 5 October 2021 an additional £300m for winter health and social care pressures.  
18.  The Scottish Government announced on 9 December 2021 the indicative Scottish Budget 2022/2023.  Work is ongoing to confirm recurring 
and non‐recurring funding allocations.
19.  Lanarkshire Mobilisation Plan 2021/2022 Funding has been confirmed which meets the additional costs of the Covid‐19 pandemic, including 
the underachievement of savings.  The cost of the recovery and remobilisation of health and social care services in 2022/2023 continues to be 
monitored.
ACTIONS
1.    Annual budget setting processes within each of the partners.
2.    The development of the IJB Reserves Strategy 2022/2023 is being progressed.
3.    The review and update of the IJB Medium to Long Term Financial Plan is ongoing.
4.    The Business Case to take forward the remobilisation and recovery of services and also transformational changes is being developed.
5.    The Lanarkshire Mobilisation Plan 2021/2022 costs for quarter 3 were submitted to the Scottish Government on 31 January 2022.
6.    Confirmation was received on 25 February 2022 of the additional funding for 2021/2022 to address the costs incurred in 2021/2022 in respect 
of the Covid‐19 pandemic and also the remobilisation and recovery of services.  On conclusion of the financial year 2021/2022, any uncommitted 
funding will be ring‐fenced as an IJB reserve to meet Covid costs in 2022/2023.  The financial implications of this are being monitored.
7.    Ongoing consultation with the Scottish Government in respect of the IJB Reserves Strategy 2022/2023 and the anticipated additional costs in 
2022/2023 will be progressed by the IJB Chief Financial Officer.
8.    The implementation of the approved Business Case to invest the Change Fund and the 2022/2023 recurring Scottish Government funding to 
maximum effect over the following 2 to 3 year period.
HIGH
Report Prepared by Christine Jack on behalf of the Chief Officer Page 1 of 6

Page 7

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 30/06/22)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
Risk Closed ‐ 
Changes By MM
IJB04.
21
Financial
Strategic
01/04/2021
Notional Set‐Aside Budget
There is a risk that resources will not be transferred from Acute Services to the HSCP in line with the shift in the 
balance of care from residential and acute settings to community based alternatives as expected in terms of the 
notional set‐aside concept.  This includes the ongoing development of locality pathways to support maintaining 
people at home e.g. transitional care models.
VERY HIGH
CONTROLS 
1.There is complete transparency and ongoing dialogue between the IJB and the Health Board on the challenges associated with the 
implementation of the notional set‐aside concept.
2.  Bed modelling and capacity planning arrangements are in place. 
3. Effective working relationships between both partners and the IJB have been established. 
4.  Since the inception of the IJB, an agreement is in place whereby the NHSL Health Board will manage the overspend or underspend across the 
notional set‐aside budget.  This arrangement continues to be in place for 2021/2022.
ACTIONS 
1.The Chief Officer and the Chief Financial Officer continue to raise this concern at a national level.
HIGH
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.22
IJB05.
21
Financial
Strategic
01/04/2021
Hosted Services
There is a risk of dispute between the North Lanarkshire IJB and the South Lanarkshire IJB in respect of the 
financial allocations underpinning the Hosted Services particularly as a result of the budget changes linked to the 
implementation of devolved locality models.  This could impact on the ability of each IJB to achieve its 
commissioning intentions and may also have an adverse impact on service users across Lanarkshire.
VERY HIGH
CONTROLS 
 
1. North and South IJBs aim to co‐operate to ensure a pan‐Lanarkshire approach is achieved across all hosted services.
2.  Financial and budgetary controls.
3.  Performance reports on service delivery.
4.  The Hosted Services principles in respect of the management of the overspends and underspends are agreed for each financial year. ACTIONS   
1. North and South IJBs will undertake a review the financial principles in respect of the hosted services to further develop the current 
arrangements in line with emerging good practice and guidance. 
M
EDIUM
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.22
IJB06.
21
Financial 
Operational
01/04/2021
Prescribing Activity and Costs
Prescribing costs may escalate due to increases in prescribing activity and increasing price volatility, new drugs 
becoming available, the response to the Covid‐19 pandemic and the impact of EU withdrawal.
M
edium 
CONTROLS
1.. Prescribing Quality and Efficiency Programme.
2.  Prescribing Management Board functions and membership.
3. Deputy Lead Pharmacist supporting HSCP Senior Leadership Team.
4. Locality Pharmacist input.
5. Earmarked reserve established to address prescribing costs.
ACTIONS
1.. Locality Prescribing Action Groups.
2. Continuation of Scriptswitch.
M
edium 
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.22
Previously IJB11.
Previously IJB20.M
edium 
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.22
IJB03.
21
Financial
Strategic
01/04/2021
Impact of European Union Withdrawal
There is a risk that the IJB is unable to implement the Strategic Plan because of the operational and financial 
challenges posed by European Union (EU) withdrawal  leading to a failure to achieve the desired strategic aims 
and an adverse impact on both operational service delivery and the achievement of financial balance.  The impact 
on health and social care services of leaving the EU continues to be difficult to forecast.  The following significant 
risks continue to be monitored at a national level.
(1)  The UK 's membership of the common regulatory bodies and EU agencies, such as the European Medicines 
Agency, (EMA), European Centre for Disease Prevention and Control and the European Atomic Energy 
Community. The risk is that this could impact on the availability of medicines, healthcare techniques and 
technology. 
(2)  In respect of the supply of medicines and medical devices, additional checks are now required at ports in the 
UK and the EEA before goods, including medical products, can cross the border.  New customs checks are 
required when moving medicines between the EEA and the UK.
(3)  There is no longer the free movement of labour between the UK and EEA countries.  All workers arriving from 
the EEA and non‐EEA countries are subject to the same immigration rules.  The new points‐based immigration 
system makes exceptions for the majority of health care professionals with an NHS job offer and for qualified 
social workers via a new fast‐track visa route, known as the Health and Care Worker Visa. There are however no 
exceptions made for other social care roles, such as care workers.
(4)  The Mutual Recognition of Professional Qualifications Directive is an EU‐wide directive that allows 
professional regulators in all member states to automatically recognise professional qualifications.  The UK 
government has decided to continue recognising qualifications gained in the EEA for at least two years after the 
transition period ends.  This however is not a reciprocal and there is no guarantee that qualifications gained in the 
UK will be accepted by professional regulators in EEA nations.
(5)  There continues to be a risk of disruption to the supply chains, part of the risk in respect of which was 
minimised with mitigating actions such as stockpiling.  
(6)  The future of Scottish patients' healthcare in other European countries and the impact of reciprocal 
healthcare and the free movement of healthcare including the impact of the changes to the European Health 
Insurance Card (EHIC).
M
edium 
CONTROLS 
1. Silver command' group  formed for HSCP.
2. On 24 December 2020 a new EU‐UK trade and co‐operation deal was agreed.
3. In respect of the regulation of medicines and medical devices, the Medicines and Healthcare products Regulatory Agency (MHRA) became the 
UK’s sovereign regulator.
4. The new trade deal contains specific clauses that mean both the UK and EEA states formally recognise each other’s good practice in medicine 
manufacturing.
5. To reduce the risk of divergence from the EU rules, there are three interrelated factors; the technical annexes of the new trade deal, the 
Northern Ireland protocol and the UK Internal Market Act.
6. All successful Health and Care Worker Visa applicants are exempt from the Immigration Health Surcharge, a one‐off charge levied against 
arriving migrant workers as part of the visa application process.  The system has been designed to make international recruitment into health and 
social care roles more straightforward for employers and employees alike.  These changes to immigration rules are in law as part of the 
Immigration and Social Security Co‐ordination (EU Withdrawal) Act 2020.  As such, from 1 January 2021, they apply to all workers arriving to work 
in the NHS or adult social care.  All workers from EEA nations who are already resident in the UK had until 30 June 2021 to apply for the EU 
Settlement Scheme which will guarantee their right to work in the UK indefinitely.
7. In respect of the mutual recognition of professional qualifications, professional regulatory bodies are working with the UK government to 
review future registration requirements for those with qualifications gained in the EEA and decide what they will be from January 2023.
8. The effectiveness of the Border Operating Model to import and export goods to and from the EEA, which was being implemented in 3 stages 
from 2020 to minimise any risk of disruption, is still being assessed.  The risk of border delays is still evident.  Other measures were also 
implemented specifically to mitigate the risk of supplies of medicines and medical devices being disrupted.  In August 2020 the UK government 
instructed medicine suppliers to maintain a stockpile equivalent to six weeks’ supply though the first three months of 2021.  In addition, the 
Department of Transport has secured additional freight capacity to bring medicines into the country via other routes.
9. Reciprocal health care is subject to the Withdrawal Agreement, the collection of guidance outlining the rules in each state, the completion of 
relevant visa applications and the payment of the Immigration Health Surcharge in order to access NHS services (where applicable).  The rights of 
access for EU citizens who need work or study in the UK for less than six months was still being decided.  Global Health Insurance Cards have been 
implemented to cover both urgent and routine medical treatment.
10. In respect of reciprocal health care, the rights of access to health care for UK citizens who move to the EEA after the transition period is being 
decided independently by each member state and will differ substantially between them.  
ACTIONS
1.HSCP fully participates in the NLC and NHSL resilience arrangements. 
2.HSCP workshops undertaken.
3. Business Continuity Plans revisited and updated for all services and sites.
Report Prepared by Christine Jack on behalf of the Chief Officer Page 2 of 6

Page 8

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 30/06/22)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
Risk Closed ‐ 
Changes By MM
IJB07.
21
Financial
Strategic
01/04/2021
Third and Voluntary Sector
There is a risk that Third Sector organisations in North Lanarkshire are vulnerable because of the lack of certainty 
in respect of long‐term funding security.  This uncertainty has the potential to lead to service instability, 
recruitment and retention challenges and an increasing reliance on statutory services. 
HIGH CONTROLS
1.  Third Sector Interface represented on key strategic groups.
2.  Community capacity building and carer support infrastructure embedded across North Lanarkshire.
3.  Community capacity building is regularly reviewed.
4.  Maximising funding opportunities for the third and voluntary sector will continue to be progressed.
ACTIONS
 
 
1.The annual HSCP funding which is directed to the third sector is recurring funding.  Funding will be confirmed each year in line with the 
agreement of the IJB Financial Plan and subject to the Scottish Government financial settlements for future years.
LOW
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.22
Previously IJB16.
IJB08.
21
Financial
Strategic
01/04/2021
Financial Implications of Responding to and Recovering from the Covid‐19 Pandemic
There are a range of IJB risks associated with the response to and recovery from the Covid‐19 pandemic.  
Additional funding was received from the Scottish Government in 2020/2021 to meet the additional costs of the 
Covid‐19 pandemic.
Further funding for 2021/2022 has been confirmed by the Scottish Government to meet the additional costs of 
responding to and recovering from the Covid‐19 pandemic.
The IJB projected out turn 2021/2022 is not available to meet the 2021/2022 Covid‐19 costs.  The projected 
underspend requires to be retained to implement the Business Case and to recover and redesign health and 
social care services.
Insufficient reimbursement of funding from the Scottish Government would impact on the implementation of the 
Response, Recovery and Redesign Plans in 2022/23.  The 2022/2023 Savings Plans may also not be achieved in 
part or in full due to key resources continuing to be diverted to respond to the Covid‐19 pandemic.  
This risk could lead to significant operational, financial, legal and/or reputational harm to the HSCP and also 
adversely impact on the Strategic Plan outcomes.
VERY HIGH
CONTROLS
 
1.Governance arrangements are in place in respect of the approval and monitoring of additional Covid‐19 costs and the recovery and redesign 
plans.
2 Delivery of savings will continue to be tracked and monitored.
3.The financial position is being monitored on an ongoing basis by SLT, IJB PFA and IJB.
4. The IJB Chief Officer and the Chief Financial Officer are actively engaging with the Scottish Government and other Networks and providing 
regular updates on the mobilisation and remobilisation plans and the associated costs.
ACTIONS
1. All costs associated with responding to the Covid‐19 pandemic are being tracked and reported to the Scottish Government through the 
completion of the Remobilisation Plan Financial Returns.
2.  A financial tracker on Covid‐19 related expenditure (as part of the Local Remobilisation Plan) is updated on a 4 weekly basis.  Quarterly updates
are submitted to the Scottish Government.
3. The IJB Reserves Strategy 2021/2022 has been discussed with the Scottish Government Officers.                                                                              4. 
The IJB Reserves Strategy 2021/2022 is being implemented.  The IJB Reserves Strategy 2022/2023 is being developed.
VERY HIGH
M
EDIUM
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.11.22
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
30.11.22
IJB09.
21
Financial
Strategic
01/04/2021
Impact on the Strategic Plan Due to the Covid‐19 Pandemic
1.  Social Care providers continue to be significantly impacted by the Covid‐19 pandemic.  There are risks 
associated with the ongoing financial stability of providers during the Covid‐19 pandemic and some external 
providers may be unable to continue operating without ongoing financial and operational support.  If providers 
are unable to safely staff services, there could be a risk of harm to service users and failure of the provider.
2.  Providers are operating under unique and significantly detrimental conditions including continuity of service 
being disrupted due to the requirement to focus on priority services only, increased infection control measures 
and associated costs, increased staff absence and associated costs, reduced availability of back‐up staff and social 
distancing requirements.  Premises may not be suitable to deliver services in these circumstances.
3.  Increased reporting requirements to provide data to regulatory bodies are stretching limited resources.
4.  Sufficient emergency/additional services to continue to respond to the Covid‐19 pandemic may not be 
available.  Hospital admissions may not be avoided and discharges from hospital may be delayed.  General 
Medical Services may not be sustainable.  There are whole system capacity constraints across primary care 
services impacting on Acute Services. 
5.  Discharges from hospital may impact on care at home, residential care, nursing care and respite provision.
6.  There is an increase in demand for a range of health and social care services as a result of the Covid‐19 
pandemic.  There is insufficient workforce capacity and there is a risk the Working Time Directive may be 
breached.  There is insufficient equipment for key areas e.g. ventilators, pumps, etc.  Personal Protective 
Equipment and supplies may be limited.  The required service specification and standard may not be procured.  
There may be insufficient mobile IT devices.
7.  There may be constraints in respect of the supply of vaccinations.
8.  There are significant risks associated with the mutation of the Covid‐19 virus and the new variants.
9.   There is an adverse impact on the progress of transformation service redesign opportunities including 
implementing agreed efficiency savings.
10.   Prioritising the impact of the response to the Covid‐19 pandemic may divert limited resources away from key 
essential services which may lead to additional resource requirements and costs over the medium to longer term.
11.  There may be a lack of HSCP management capacity and resilience to co‐ordinate the response to the 
pandemic.
This may lead to an adverse impact on service delivery and financial overspends.
12.  The risk status across NHS Lanarkshire has been moved to 'Black', the highest risk level.
VERY HIGH
CONTROLS
1. Scottish Government and COSLA guidance is being complied with.
2. NHS National Services Scotland are supporting primary care and social care services.  PPE is available in line with Health Protection Scotland 
guidance.
3. Chief Medical Officer guidance as adopted by the four nations has been published, put into effect and endorsed by the Scottish 
Government/COSLA.  Updates are also adopted.
4. Scottish Government are focusing on the care home sector to support continuity of service delivery.  A national protocol to support discharge 
of Covid‐19 patients is in place.  Care home liaison nurses are in place.
5. Remote working and flexible working arrangements are also in place.  There is an increase in the number of agile workers and an increase in 
the number of laptops/tablets provided.  A blended approach to home/work‐based working is being developed going forward.
6. Arrangements are in place across the partnership to review service user and carer prioritisation in terms of accessing service and support.  
Resources are targeted to those with critical or substantial needs.
7. Arrangements are in place to support carers in their caring role, working in partnership with voluntary organisations to provide early 
intervention and preventative supports.  
8. Reliance is being placed on the Social Care Sustainability Payments by External Social Care Providers up to 30 June 2022.  The HSCP continues to 
liaise and support providers to ensure there is early identification of problems and early intervention if necessary.
9. The Response, Recovery and Redesign Remobilisation Plan has been developed and is regularly updated.  Response, Recovery and Redesign 
Plans are in place across the IJB and both partners.
10. Safe systems of working have been adopted.  Regular cleaning regime is in place across all premises.  All workplace appropriate social distance 
signage is in place.
11. Risk registers are in place for the IJB and each partner.  Each partner has a specific HSCP Covid‐19 Risk Register in place.
12. The Scottish Government is taking appropriate action to mitigate the impact of the variants of the Covid‐19 virus as far as possible.
ACTIONS 
1.  Emergency Command and Control structures have been established by each partner.  Infection Prevention Control and Social Distancing 
requirements are being complied with.
2.Up‐to‐date information is disseminated to all staff across the HSCP as the situation develops and a consistent communication strategy is in place 
with employees across IJB, NHSL and NLC websites
3.IJB and partner business continuity plans are being regularly reviewed.  
4.The HSCP is actively engaging with the third and independent sector in relation to service opportunities to meet the low/moderate needs of 
service users/patients and their associated costs.  
VERY HIGH
M
EDIUM
Report Prepared by Christine Jack on behalf of the Chief Officer Page 3 of 6

Page 9

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 30/06/22)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
Risk Closed ‐ 
Changes By MM
IJB.10.
21
Financial
Strategic
01/04/2021
Ineffective Governance Arrangements Due To the Covid‐19 Pandemic
1.   There is a risk that the intensity of the required response to Covid‐19 could result in a failure of governance 
impacting on the effectiveness of the IJB decision‐making, IJB directions to partners and IJB oversight of 
operational service delivery.  Routine governance processes could be overwhelmed. 
2.   New or amended Covid‐19 legislation and Scottish and UK Government guidance may not be adopted 
effectively and timeously.
3.   There is no / limited public access to IJB and PFA meetings during the period of the pandemic, in line with 
Public Health advice.
4.   Ineffective information governance controls could lead to data breaches and an impact on the General Data 
Protection Regulations.
5.   Communications with employees, patients and service users may be ineffective.
6.   There will require to be changes to the working environment including remote working and working from 
home.
7.  There is a reduced ability to protect the wellbeing of employees, patients and service users.
8.   There may be adverse media coverage locally, a loss of public confidence and reputational damage.
M
EDIUM
CONTROLS
1. National Networks are established which are providing the framework to support a national approach where appropriate.
2.  Public Health advice and support is in place. 
3.  Increased numbers of agile workers and increased number of laptops/tablets.
4.  Continued working from home arrangements supported by the roll out of MS Teams / Zooms.  Regular updates on the guidance for the use of 
MS Teams / Zoom Meetings is circulated.  A blended approach to home/work‐based working is being developed going forward.
5.  Risk registers are in place for the IJB and each partner.  Each partner has a specific HSCP Covid‐19 Risk Register in place.
6.  The IJB and both partners aim to comply with the European Working Time Directive (WTD) and minimise the risk of all staff working beyond 48 
hours per week, in particular front‐line service delivery.  As a result of the withdrawal from the European Union, the WTD ceased to apply to the 
United Kingdom at the end of the transition period (31 December 2020).  However, the UK's Working Time Regulations which implement the EU 
Working Time Directive will continue to apply unless and until amended by UK law.
ACTIONS 
1.  Staff health and well being is a key priority for both partners and all key stakeholders.  The commitment to staff health and well being is being 
actively promoted through all available forums.
M
EDIUM
LOW
Ross M
cGuffie
M
arie M
oy
SLT, IJB PFA, IJB
31.12.22
IJB.11
21 
Performance  30/07/2021
Oversight of Performance Activity                                                                                                                                               
There is a risk that the  IJB is not provided with adequate or sufficient performance information to enable it to 
discharge its scrutiny and oversight role; make informed decisions and recommend remedial actions to address 
any performance concerns. 
LOW CONTROLS
1. Regular (quarterly) reports on the IJB performance framework, providing updates on areas for improvement, remedial actions (and timescales) 
and updates on performance issues previously reported.
2. Chief Executive Performance Review arrangements.
3. Hosted Services Performance Review arrangements.
4. Sector/Locality Performance Review arrangements.
ACTIONS
1. Request detailed topic based performance reports on specific areas of concern  e.g. CAMHS & Psychological Therapies.
low  LOW
Ross M
cGuffie
M
orag Dendy 
SLT, IJB PFA, IJB
31.12.22
IJB.12.
21 
Performance  30/08/2021
Staff Health & Wellbeing
There is a risk to the delivery of the Strategic Commissioning Plan as a result of sustained pressures on staff 
availability due to additional pressures associated with  Covid 19, current sickness absence levels and potential for
further staff redeployment due to winter planning contingency arrangements.                                                   
medium 
Controls
1. Strategic Staff Health & Wellbeing Committee  established reporting to NLC & NHSL corporate management teams.
2. Range of support services available both nationally and locally e.g. Occupational Health, Spiritual care, Psychological Services, national 
wellbeing hub (www.PRoMIS.scot.uk).                                                                                                                                                                                                  
3. Rest & Recuperation areas identified.                                                                                                                                                                                               
4. Peer Support Networks established                                                                                                                                                                                                   
5. Well established Occupational Health supports available to support staff sickness.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Actions
1. Short Life Working Group for wellbeing with targeted approach for immediate actions including Staff Health & Wellbeing Champions, access to 
online supports, access to Occupational Health Services, helpline established and dedicated resource identified for wellbeing officers to be 
recruited.
2. Funding received by Scottish Government specifically targeting staff well‐ being programmes and supports. Local plans for use of funding being 
developed.                                                                                                                                                                                                                                                   
3. Managers supporting & encouraging staff to take planned leave/use full leave allocation.                                                                                                
4. Staff being encouraged to submit proposals  for use of targeted funding & some programmes already in place. 
HIGH 
low  Ross M
cGuffie
Ross M
cGuffie 
SLT, IJB PFA, IJB, SC&CG, AH&SC 
31.12.22
IJB.13.
2021 
Performance  30.08.21 
Care Homes                                                                                                                                                                       
Inability of care homes to sustain service due to staffing or Covid outbreaks resulting in closure to new 
placements. This may increase delayed discharge numbers putting additional pressure on acute site capacity and 
impacting on recovery.
The financial support for social care providers during the Covid‐19 pandemic is being reviewed.  Payments in 
respect of under‐occupancy in care homes were extended to 30th June 2022.                                                                  
High  Controls                                                                                                                                                                                                                                                       
1. Establishment of Care Home Assurance Team.
2. Escalation Process in place.
3. National protocol to support discharge of Covid 19 patients in place.
Actions 
1.  Public Health teams providing guidance on infection control.
2. Care Home assurance team undertaking support visits to all care homes & action plans in place for each care home.
3. Staff and visitor testing in place.
4. All care homes advised to use PPE in line with national  addendum.
High 
medium 
Ross M
cGuffie
Trudi M
arshall 
IJB, PF&A, SLT, SC&SC, A H &SC 
31.12.22
5. Additional funding for 2021/2022 and 2022/2023 has been announced by the Scottish Government.  Further Covid‐19 funding was confirmed
on 25 February 2022.
6. The vaccination programme is continuing to be rolled out.
7. Having regard to the assessment of risk across NHS Lanarkshire as 'Black', action is being taken to mitigate the impact of the Covid‐19 pandemic 
over the winter period and COP26 in consultation with the Scottish Government.  The position is being closely monitored. 
Report Prepared by Christine Jack on behalf of the Chief Officer Page 4 of 6

Page 10

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 30/06/22)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
Risk Closed ‐ 
Changes By MM
IJB.14.
2022
Strategic & 
Performance 
30.04.22
CAMHS ‐                                                                                                                                   There is a risk that the CAMHS 
service cannot meet the increasing clinical demands due to a significantly high number of cumulative staff 
vacancies for both clinical and non‐clinical posts and challenges recruiting to new posts identified through the 
national recovery and renewal fund.  This is impacting on community, in‐ patient and out‐ patient care with the 
potential to adversely affect response time to referrals; longer waiting times; poorer outcomes; delays in redesign 
and reputation of the IJB. 
Very High 
Controls ‐                                                                                                                                                                                                         1.  Prioritisation of 
referrals; all referrals vetted daily with urgent referrals prioritised 
2. Commenced programme of work and implementation of a more structured partnership approach through Choices & Partnership Approach 
(CAPA) service model, with tier 1 & 2 referred through 3rd sector and interfacing with North & South Education Departments
3. Secured significant national investment to fully implement new service model
4. Active review of skill mix to utilise medical staff only when required for highly complex patients
5. Vacancy gap analysis with active recruitment commenced.  Expected to have recruited 50% of gap by end of May 2022
6. Continuous review and validation of the waiting list
Action
1. Incremental implementation of the new service model
High
medium 
Ross M
cGuffie
M
orag Dendy 
IJB,PF&A, SLT 
30.11.22
IJB.16.
2022
Strategic   05.09.22
National Care Service
There is a risk that the ongoing work around a National Care Service could destabilise current service delivery due 
to significant change activity, time demands around the co‐design process, staff uncertainty and partner 
organisations having to focus inwardly due to the impact of change leading to an impact on the ability to deliver 
the significant ongoing change programmes already approved by the IJB and the Strategic Commissioning Plan for 
2023‐26. 
High CONTROLS 
1. NLC establishing NCS working groups
2. Key HSCP leads involved in national developments
3. Ongoing progress updates to IJB and IJB PFA
ACTIONS
1. IJB response submitted on proposed Bill
2. Strong partnership links into working groups at Chief Officers, Chief Finance Officers and Social Work Scotland groups
High
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
31.12.22
SLT, IJB
31.12.22
SLT, IJB PFA, IJB 
30.11.22
IJB.17.
2022
Strategic & 
Performance 
05.09.22
Unscheduled Care
There is a risk that we cannot sustain whole system patient flow through peak winter pressures due to increased 
front door demand; hospital workforce capacity; delays in onward movement of patients due to care home 
capacity/outbreaks and care at home capacity; and community health and social care workforce capacity leading 
to reduced ability to meet 'routine'  and increasing bed demand for more unwell patients, deteriorating delayed 
discharge performance and an inability to recover services. 
Very High
CONTROLS
1. Care Home Assurance Group and associated supports for care homes through liaison service, IPC advice and support, risk assessment for 
onward movement of patients etc
2. Care at Home Assurance group and associated activity to try to support and sustain independent sector provision
3. NHS CMT and Covid response group oversight of performance
4. Daily PDD meetings to review every planned supported discharge and delayed discharge
ACTIONS
1. Expansion of Home Support service
2. Roll out of Home Assessment Teams across all 6 Localities by Feb 23
3. New CSW roles in District Nursing teams to proactively support Care Managed patients
4. Additional Nursing capacity in District Nursing Teams
5. Expansion of Equpiment and Adaptation Service to support rapid access in community
6. Expansion of H@H service (hours of provision as well as moving to support discharges as well as admission prevention)
7. Expansion of Integrated Rehabilitation Teams in all six Localities to support rehab in the community and reduce long‐term service demand
Very High
M
edium
Ross M
cGuffie
Ross M
cGuffie
CONTROLS
1. NLC Silver command group stood up focused on cost of living
2. NHSL commenced review through CMT
3. Population Health Committee to review activity around cost of living
ACTIONS
1. Survey of NLC hybrid workers to see if home working remains financially viable
2. Business case being developed to expand 'support for people' arrangements used in pandemic to support resident access to welfare rights and 
other supports
3. 3% increase in individual budgets to support service users to maintain current levels of supports at higher cost
4. Recommendation from adult social work, care and wellbeing committee to review all charges to service users and wider cost of living supports 
that could be offered
High
M
edium
Ross M
cGuffie
Ross M
cGuffie
IJB.15.
2022
Strategic & 
Performance 
05.09.22
Cost of Living
There is a risk that the IJB's Strategic Commissioning Plan will be unable to be delivered or not have the desired 
impact due to the cost of living rises being faced by residents across North Lanarkshire, leading to a further 
widening of the inequality gap, reduced quality of life and increased health and social care demand due to 
individuals and families having insufficient funds to support basic requirements such as food and heating. 
High
Report Prepared by Christine Jack on behalf of the Chief Officer Page 5 of 6

Page 11

Appendix 1 North Lanarkshire Integrated Joint Board Risk Register (Accurate as 30/06/22)
IJB ID Category Opened Date
Description of Risk Risk level (initial)
Mitigating Controls Risk level (Current)
Risk level (Target)
Risk Owner
Risk Register Lead
Assurance Source
Review 
Date
Closed Date
Risk Closed ‐ 
Changes By MM
IJB.18.
2022
Strategic and 
Performance 
05.09.22
Community Alarms
There is a risk that the community alarm system will be destabilised due to the national change from analogue to 
digital telephony by 2025, leading to community alarm users not getting a response when required. 
High CONTROLS
1. Working group established to coordinate all activity
2. Oversight through Home Support Programme Board
3. Reporting to Adult Social Work, Care and Wellbeing Committee
4. Reporting to IJB
ACTIONS
1. NLC Committee approval to purchase 1000 digital alarms so the service can support any imminent changes over to digital in individual areas
2. NLC part of SG once for Scotland procurement process for a new digital alarm receiving centre
3. Communication out to all community alarm service users
4. Instructions issued to all community alarm service users on how to do test calls to ensure alarms are  operational
5. Engagement with telecommunication suppliers to ensure sight of roll out plans across NL
M
edium
Low
Diane Fraser
Ross M
cGuffie
SLT, IJB PFA, IJB, ASW
C&W
B 
31.12.22
Report Prepared by Christine Jack on behalf of the Chief Officer Page 6 of 6